Public Facilities Committee Meeting — Agenda Packet
Beaufort County · Beaufort County · Public Facilities Committee · meeting of Aug 18, 2025 · Agenda packets
Open the original document More from Beaufort County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Public Facilities Committee Meeting
Beaufort County, SC
2nd Floor Courtroom, Arthur Horne Building
104 Ribaut Road
Beaufort, SC 29901
Monday, August 18, 2025
3:00 PM
AGENDA
COMMITTEE MEMBERS:
Logan Cunningham, Chair
Paula Brown
Thomas Reitz
David P. Bartholomew, Vice-Chairman
Mark Lawson
Alice Howard, Ex-Officio
1. CALL TO ORDER:
2. PLEDGE OF ALLEGIANCE:
3. STATEMENT OF COMPLIANCE WITH FOIA:
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES
● June 16, 2025
6. PUBLIC COMMENT PERIOD – 15 MINUTES TOTAL
7. ASSISTANT COUNTY ADMINISTRATOR REPORT
a. Palmetto Breeze Update (FISCAL IMPACT: For information only) - Brian Sullivan, LRTA
Executive Director
8. AGENDA ITEMS
a. Recommend a contract award to Wood and Partners for the planning, permitting and construction
oversight of Bermuda Bluff ($236,850) (FISCAL IMPACT: The Wood and Partners contract
amount of $236,850 will be funded from account 4502-80-0000-54420, which has a current
balance of $4,128,938.48. The future construction of this project will be funded with a FY25
Local A/H Tax Grant award from account 2002-10-0000-54500-PPARK, which has a current
balance of $650,000.) - Stefanie M. Nagid, Land Preservation Director, 5 minutes
b. Recommendation to Approve Talbert, Bright, and Ellington (TBE) Work Authorization (WA) 2119-
2501 for Beaufort Executive Airport (ARW) Partial Parallel Taxiway (Design & Bidding) (FISCAL
IMPACT: The total value of this Work Authorization shall not exceed $252,074.31.
The project funding is allocated as follows:
FAA Grant (Federal 95%) $244,220.00
SCAC Grant (State 2.5%) $6,427.00
Page 1 of 329
ARW (Local 2.5%) $6,428.31
GL Code 5102-90-0000-57130 | Current Encumbered Balance: $4,385,452.00) - Jon Rembold,
Airports Director, 3 minutes
c. Recommendation to Approve a Work Authorization to Talbert, Bright, and Ellington for construction
administration at the Hilton Head Island Airport for the Airfield Drainage Improvements
$240,923.36. (FISCAL IMPACT: The total value of this Work Authorization shall not exceed
$240,923.36.
The project funding is allocated as follows:
FAA Grant (Federal 95%) $1,493,515.00
SCAC Grant (State 5%) $78,606.71
GL Code 5402-90-0000-57130 | Current Encumbered Balance: $37,823,683.00.) - Jon
Rembold, Airports Director, 3 minutes
d. Recommendation to approve a Work Authorization for Talbert, Bright, and Ellington to prepare the
Environmental Assessment for Taxiway "F" Runway Object Free Area project at the Hilton Head
Island Airport $322,129.21 (FISCAL IMPACT: This project is 100% funded by federal and state
grants. The total estimated cost of the project is $322,129.21, with funding allocated as
follows:
Federal Aviation Administration (FAA):
Federal (95%): $306,023.00
South Carolina Aeronautics Commission (SCAC):
State Share (5%): $16,106.21
GL Code 5402-90-0000-57130 | Current Encumbered Balance: $37,823,683.00) - Jon Rembold,
Airports Director, 3 minutes
e. Recommendation to Approve a Resolution to Accept a South Carolina Aviation Commission
(SCAC) Grant for the Hilton Head Island Airport (HXD) Administration Building Conceptual (Design)
(FISCAL IMPACT: The design package of the project is 100% funded by state grants utilizing
Airport Entitlement funding.
GL Code 5402-90-0000-57130 | Current Encumbered Balance: $37,823,683.00) - Jon Rembold,
Airports Director, 3 minutes
f. Recommendation of Award to Infrastructure Consultants & Engineering for the 2025 Pavement
Evaluation & Maintenance Plan $355,294.50. (FISCAL IMPACT: The contract fee is $322,995.00.
Staff recommend a 10% contingency of $32,299.50, bringing the project budget to
$355,294.50. Funding of $63,900 for the cost of the alternate scope items will be from Public
Works GL account 1000-30-1301-51170 with a balance of $485,665.24 The funding for the
balance of this contract will be from the Beaufort County Transportation Committee (CTC)
infrastructure account number 2343-30-0000-54500 with a balance of $3,331,038.40.
An Intergovernmental Agreement with the City of Beaufort, the Town of Bluffton, the Town
of Port Royal and the Town of Hilton Head Island is being presented separately. ) - Bryan
Bauer, PE, Director of Engineering (5 min)
g. Recommendation of Award to Sandhill ALS Construction, Inc. for the Alljoy Road Sidewalk Project
in the amount of $2,759,374.20. (FISCAL IMPACT: The contract fee for materials and
construction is $2,508,522.00. Staff recommend a 10% contingency of $250,852.20 for a
total anticipated project budget of $2,759,374.20. The funding for this project is from the
2018 Sales Tax Pathway Fund, account number 4705-80-0000-54500 with a balance of
$13,058,089.50.
Partial funding in the amount of $1,177,868.71 will be provided as a reimbursement from a
federal Transportation Alternative Program (TAP) Grant administered by the South Carolina
Department of Transportation.) - Bryan Bauer, P.E., Director of Engineering, 5 Min
h. Recommendation for approval of an Intergovernmental agreement between Beaufort County and
the Town of Port Royal, Town of Bluffton, Town of Hilton Head Island and the City of Beaufort for
Page 2 of 329
participation in the Pavement Evaluation and Maintenance Plan project. (FISCAL IMPACT: The
county has a contract with the vendor to evaluate our county-owned paved roads. Each
municipality will provide funding based on the number of road miles they have requested
surveyed. The total amount of contributions to the project total $26,060.00.
Hilton Head $10,830.13
Port Royal $1,353.77
Bluffton $5,076.62
City of Beaufort $8,799.48
Total $26,060.00) - Bryan Bauer, P.E., Director of Engineering (5 Min)
i. Recommendation of Award to Wildwood Contractors, Inc. for the construction of the Depot Road
Pathway Project in the amount of $552,531.54 (FISCAL IMPACT: The contract fee for materials
and construction is $502,301.40. Staff recommend a 10% contingency of $50,230.14,
bringing the project budget to $552,531.54. The funding for this project is from the 2018
Sales Tax Pathway Fund, account number 4705-80-0000-54500 with a balance of
$13,150,500.94. Partial funding in the amount of $200,000 will be provided as a
reimbursement from a Community Development Block Grant through the City of Beaufort.) -
Bryan Bauer, P.E., Director of Engineering, 5 Min
j. Recommendation of a change order to the Contract with W.M. Roebuck, Inc. for the Construction of
Mast Arms at the Intersection of Bluffton Parkway and River Ridge Dr. $124,452.00. (FISCAL
IMPACT: Staff reviewed the revised pricing submitted by W.M. Roebuck and found the
prices fair and reasonable as comparable to recent bids. The funding for this change order
will be from the 2023 Beaufort Impact Fees Account #2300-30-0000-54500-South with a
balance of $2,818,103.31.
Original contract amount $320,820.50
Change order (#1) amount $124,452.00
Revised contract amount $445,272.50 ) - Bryan Bauer, P.E., Director of Engineering, 5
Min
k. Recommendation of Award to Davis and Floyd Engineers for the Alljoy Boat Landing/ Parking
Design $544,500 (FISCAL IMPACT: The contract fee for this project is $495,000. Staff
recommends a 10% contingency of $49,500. The funding for this is $350,000 from the A & H
taxes from account # 2001-10-0000-57130-BOAT with a balance of $869,356 and a grant from
the SC Department of Natural Resources in the amount of $1,200,000 of which $145,000 will
be allocated to this design project.) - Bryan Bauer, P.E. Director of Engineering, 5 min
l. Recommendation of Award to Davis and Floyd Engineers for the Wimbee Creek Pier Design
$436,700 (FISCAL IMPACT: The contract fee for professional services is $397,000. Staff
recommends a 10% contingency of $39,700. Funding for this project is from A & H tax with
account number 2002-10-0000-54500-BOAT and a balance of $750,000.) - Bryan Bauer, P.E.,
ENV SP Director of Engineering (5 min)
m. Recommendation of Award to McSweeney Engineers for Marine Facilities Inspections $373,069.12
(FISCAL IMPACT: The proposed fee is $226,153.75 with follow-up inspections in contract
years 2 and 3 not to exceed $56,500 per contract year for a total contract amount of
$339,153.75. Staff recommends a 10% contingency of $33,915.38 for a project total of
$373,069.12. This project is funded from A & H taxes from account 2001-10-0000-57130-PW
with a current balance of $400,000.) - Bryan Bauer, P.E., ENV SP, Director of Engineering (5
min)
n. Recommendation to Approve Change Order to Wilma's Pump & TankCo Inc. for IFB# 061124
Camp St. Mary's Demolition ($38,720.00) (FISCAL IMPACT: Funding comes from the Passive
Parks Capital Account for Renovations to Buildings, 4502-80-0000-54420.
The current account balance is $4,128,938.48) - Robert Gecy - Interim Director, Capital Projects
(5 Min.)
Page 3 of 329
9. ADJOURNMENT
To watch committee or County Council meetings or for a complete list of agendas and backup packages,
please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html
Page 4 of 329
Public Facilities Committee
Beaufort County, SC
*at the conclusion of Finance, Administration & Economic Development no sooner than
3:00PM* 2nd Floor Magistrates Courtroom, Arthur Horne Building, 104 Ribaut Road, Beaufort,
SC 29901
Monday, June 16, 2025
3:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic
or the complete meeting. https://beaufortcountysc.new.swagit.com/videos/345761
COMMITTEE MEMBERS:
LOGAN CUNNINGHAM, CHAIRMAN DAVID P. BARTHOLOMEW, VICE-CHAIR
PAULA BROWN MARK LAWSON
THOMAS REITZ ALICE HOWARD, EX-OFFICIO
1. CALL TO ORDER
Committee Chairman Cunningham called the meeting to order at 3:07pm.
PRESENT
Committee Chairman Logan Cunningham
Committee Member Paula Brown
Committee Member Mark Lawson
Committee Member Thomas Reitz (arrived late)
Ex-Officio Alice Howard
Council Member Gerald Dawson
Council Member Joseph Passiment
Council Member Anna Maria Tabernik
ABSENT
Committee Vice-Chairman David Bartholomew
Council Member Lawrence McElynn
Council Member York Glover
Page 5 of 329
Public Facilities Committee Minutes – Beaufort County, SC
2. PLEDGE OF ALLEGIANCE
Committee Chairman led the Pledge of Allegiance.
3. STATEMENT OF COMPLIANCE WITH FOIA:
Committee Chairman noted the public notification of the meeting has been published, posted, and
distributed in the compliance with the South Carolina Freedom of Information Act.
4. APPROVAL OF AGENDA
Motion: It was moved by Council Member Passiment, Seconded by Committee Member Lawson
approved the agenda.
Vote: The motion was approved without objection.
5. APPROVAL OF MINUTES- May 19, 2025
Motion: It was moved by Committee Member Lawson, Seconded by Council Member Passiment to
approve the minutes of May 19, 2025.
Vote: The motion was approved without objection.
6. CITIZEN COMMENTS PERIOD
There were no citizen comments.
7. Assistant County Administrator Report
There were no Assistant County Administrator Report.
8. CONTRACT AWARD TO OMNIA FOR ROOF REPLACEMENT PACKAGE 1
Motion: It was moved by Council Member Passiment, Seconded by Committee Member Lawson to
approve a contract award to Omnia for Roof Replacement Package 1.
Vote: The motion was approved without objection.
9. CONTRACT AWARD TO OMNIA FOR HVAC REPLACEMENT PACKAGE 1
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
a contract award to Omnia for HVAC Replacement Package 1.
Vote: The motion was approved without objection.
10. CONTRACT AWARD TO BRIGHTLY FOR COMPREHENSIVE BUILDING ASSESSMENT AND FACILITIES
MANAGEMENT SOFTWARE SOLUTIONS
Page 6 of 329
Public Facilities Committee Minutes – Beaufort County, SC
Motion: It was moved by Council Member Tabernik, Seconded by Council Member Passiment to
approve a contract award to Brightly for Comprehensive Building Assessment and Facilities
Management Software Solutions.
Vote: The motion was approved without objection.
11. AN ORDINANCE AUTHORIZING THE EXECUTION AND DELIVERY OF HOLLY HILL ROAD UTILITY,
DRAINAGE, SIGNAGE, AND ACCESS EASEMENT AGREEMENT FOR HOLLY HILL ROAD LOCATED IN
BLUFFTON TOWNSHIP OFF NEW RIVERSIDE ROAD
Motion: made by Council Member Passiment, Seconded by Committee Member Brown to approve an
ordinance authorizing the execution and delivery of Holly Hill Road Utility, Drainage, Signage, and Access
Easement Agreement for Holly Hill Road located in Bluffton Township off New Riverside Road.
Vote: The motion was approved without objection.
12. AN ORDINANCE AUTHORIZING THE ABANDONMENT OF AN UNDEVELOPED PORTION OF COFFIN BLUFF
ROAD LOCATED OFF FRIPP POINT ROAD ON ST. HELENA ISLAND ROAD
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve an Ordinance authorizing the abandonment of an undeveloped portion of Coffin Bluff Road
located off Fripp Point Road on St. Helena Island Road.
Vote: The motion was approved without objection.
13. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO PURSUE CONDEMNATION FOR
PORTIONS OF PARCELS AS SPECIFIED ON EXHIBIT "A" ASSOCIATED WITH RIGHT OF WAY ACQUISITION
FOR A SIDEWALK LOCATED ON STUART POINT ROAD AS PART OF THE 2018 ONE-CENT REFERENDUM
Motion: It was moved by Council Member Dawson, Seconded by Council Member Passiment to approve
a Resolution authorizing the County Administrator to pursue condemnation for portions of parcels as
specified on Exhibit "A" associated with the Right of Way Acquisition for a sidewalk located on Stuart
Point Road as part of the 2018 One-Cent Referendum.
Vote: The motion was approved without objection.
14. A MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN BEAUFORT COUNTY AND THE SOUTH
CAROLINA AQUARIUM FOR PARTICIPATION IN THE SEARISE CITIZEN PROJECT AND AUTHORIZE THE
COUNTY ADMINISTRATOR TO EXECUTE THE MOU
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
a Memorandum of Understanding (MOU) between Beaufort County and The South Carolina Aquarium
for participation in the Searise Citizen Project and authorize the County Administrator to execute the
MOU.
Vote: The motion was approved without objection.
15. A MEMORANDUM OF UNDERSTANDING BETWEEN BEAUFORT COUNTY AND SOUTH CAROLINA
DEPARTMENT OF TRANSPORTATION (SCDOT) FOR THE SCDOT TRAFFIC SIGNAL COMMUNICATION
PROJECT AND AUTHORIZE THE COUNTY ADMINISTRATOR TO EXECUTE THE MOU
Page 7 of 329
Public Facilities Committee Minutes – Beaufort County, SC
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve a Memorandum of Understanding between Beaufort County and South Carolina Department of
Transportation (SCDOT) for the SCDOT Traffic Signal Communication Project and authorize the County
Administrator to execute the MOU.
Vote: The motion was approved without objection.
16. CONTRACT AWARD TO KTC ENTERPRISES, INC. TO CONSTRUCT 1150 FEET OF CONCRETE SHARED-USE
TRAIL FOR THE SPANISH MOSS TRAIL TO EXTEND THE TRAIL FROM RIBAUT ROAD INTO THE TOWN OF
PORT ROYAL; AND TO INSTALL A PEDESTRIAN HYBRID BEACON SIGNAL.
Motion: It was moved by Ex-Officio Officer Howard, Seconded by Council Member Passiment to approve
a contract award to KTC Enterprises, INC. to construct 1150 feet of concrete shared-use trail for The
Spanish Moss Trail to extend the trail from Ribaut Road into The Town of Port Royal; and to install a
Pedestrian Hybrid Beacon signal.
Vote: The motion was approved without objection.
17. AN INTERGOVERNMENTAL AGREEMENT (IGA) BETWEEN BEAUFORT COUNTY AND THE TOWN OF PORT
ROYAL FOR THE CONTRIBUTION OF $200,000 TOWARDS THE COMPLETION OF THE SPANISH MOSS
TRAIL (SMT) EXTENSION PROJECT.
Motion: It was moved by Ex-Officio Officer Howard, Seconded by Council Member Passiment to approve
an Intergovernmental Agreement (IGA) between Beaufort County and The Town of Port Royal for the
contribution of $200,000 towards the completion of the Spanish Moss Trail (SMT) Extension Project.
Vote: The motion was approved without objection.
18. CHANGE ORDER TO HDR, INC. FOR THE US 21 CORRIDOR STUDY
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve a Change Order to HDR, INC. for the US 21 Corridor Study.
Vote: The motion was approved without objection.
19. CONTRACT AWARD TO MCSWEENEY ENGINEERS, LLC FOR PHASE 2 OF THE BROAD RIVER FISHING PIER
DESIGN.
Motion: It was moved by Council Member Tabernik, Seconded by Council Member Passiment to
approve a contract award to McSweeney Engineers, LLC for Phase 2 of The Broad River Fishing Pier
Design.
Vote: The motion was approved without objection.
20. CHANGE ORDER FOR AN INCREASE IN APPROPRIATION FOR DESIGN AND PROJECT MANAGEMENT
SERVICES FOR THE ST. JAMES BAPTIST CHURCH RELOCATION PROJECT
Motion: It was moved by Council Member Passiment, Seconded by Committee Member Brown to
approve a Change Order for an increase in appropriation for Design and Project Management Services
for the St. James Baptist Church Relocation Project.
Vote: The motion was approved without objection.
Page 8 of 329
Public Facilities Committee Minutes – Beaufort County, SC
21. A RESOLUTION AUTHORIZING ANNUAL CPI-BASED FEE ADJUSTMENTS FOR HANGAR, STORAGE, AND
OFFICE SPACES FEES AT HILTON HEAD ISLAND AIRPORT (HXD) AND BEAUFORT EXECUTIVE AIRPORT (ARW)
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
a Resolution authorizing Annual CPI-BASED Fee adjustments for Hangar, Storage, and Office Spaces Fees
at Hilton Head Island Airport (HXD) and Beaufort Executive Airport (ARW).
Vote: The motion was approved without objection.
22. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A COMMERCIAL
OPERATING AGREEMENT BETWEEN BEAUFORT COUNTY AND PILOT SPECIALTIES, LLC.
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve a resolution authorizing the County Administrator to enter into a Commercial Operating
Agreement between Beaufort County and Pilot Specialties, LLC.
Vote: The motion was approved without objection.
23. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A COMMERCIAL
OPERATING AGREEMENT BETWEEN BEAUFORT COUNTY AND BEAUFORT FLIGHT TRAINING.
Motion: It was moved by Council Member Passiment, Seconded by Committee Member Brown to
approve a Resolution authorizing the County Administrator to enter into a Commercial Operating
Agreement between Beaufort Count and Beaufort Flight Training.
Vote: The motion was approved without objection.
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to take
Item Numbers 24 and 25 together.
Vote: The motion was approved without objection.
24. A RESOLUTION TO ACCEPT AN FAA AIP GRANT IN THE AMOUNT OF $1,493,515.00 FOR HXD AIRFIELD
DRAINAGE PROJECT (CONSTRUCTION)- CONTINGENT UPON FINAL FAA OFFER.
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
a resolution to accept a FAA AIP Grant in the amount of $1,493,515.00 for HXD Airfield Drainage Project
(Construction)- Contingent upon Final FAA Offer.
Vote: The motion was approved without objection.
25. A RESOLUTION TO ACCEPT A SCAC GRANT IN THE AMOUNT OF $78,606.71 FOR HXD AIRFIELD DRAINAGE
PROJECT (CONSTRUCTION)- CONTINGENT UPON FINAL SCAC OFFER.
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
a resolution to accept a SCAC Grant in the amount of $78,606.71 for HXD Airfield Drainage Project
(Construction)- Contingent upon Final SCAC Offer.
Vote: The motion was approved without objection.
Page 9 of 329
Public Facilities Committee Minutes – Beaufort County, SC
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to take
Item Numbers 26 and 27 together.
Vote: The motion was approved without objection.
26. A RESOLUTION TO ACCEPT AN FAA AIP GRANT IN THE AMOUNT OF $244,220.00 FOR ARW PARTIAL
PARALLEL TAXIWAY (DESIGN & BIDDING) - CONTINGENT UPON FINAL FAA OFFER.
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
a Resolution to accept a FAA AIP Grant in the amount of $244,220.00 for ARW Partial Parallel Taxiway
(Design & Bidding)- Contingent upon final FAA Offer.
Vote: The motion was approved without objection.
27. A RESOLUTION TO ACCEPT A SCAC GRANT IN THE AMOUNT OF $6,427.00 FOR ARW PARTIAL PARALLEL
TAXIWAY PROJECT (DESIGN & BIDDING) - CONTINGENT UPON FINAL SCAC OFFER.
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
a Resolution to accept SCAC Grant in the amount of $6,427.00 for ARW Partial Parallel Taxiway Project
(Design & Bidding) - Contingent upon Final SCAC Offer.
Vote: The motion was approved without objection.
28. A RESOLUTION TO ACCEPT A SCAC GRANT IN THE AMOUNT OF $39,609.00 FOR HXD FIRE SUPPRESSION
SYSTEM REPAIRS- CONTINGENT UPON FINAL SCAC OFFER
Motion: It was moved by Council Member Tabernik, Seconded by Council Member Passiment to
approve a resolution to accept a SCAC Grant in the amount of $39,609.00 for HXD Fire Suppression
System Repairs- Contingent upon Final SCAC Offer.
Vote: The motion was approved without objection.
29. A RESOLUTION TO ACCEPT AN FAA BIL GRANT IN THE AMOUNT OF $300,000.00 FOR HXD AIR TRAFFIC
CONTROL TOWER (ATCT) RENOVATION- CONTINGENT UPON FINAL FAA OFFER
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
a resolution to accept a FAA BIL Grant in the amount of $300,000 for HXD Air Traffic Control Tower
(ATCT) Renovation- Contingent upon Final FAA Offer.
Vote: The motion was approved without objection.
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to take
Item Numbers 30 and 31 together.
Vote: The motion was approved without objection.
30. A RESOLUTION TO ACCEPT A SCAC GRANT IN THE AMOUNT OF $16,106.21 FOR HXD TAXIWAY "F" ROFA
ENVIRONMENTAL ASSESSMENT- CONTINGENT UPON FINAL GRANT OFFER.
Page 10 of 329
Public Facilities Committee Minutes – Beaufort County, SC
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve a resolution to accept a SCAC Grant in the amount of $16,106.21 for HXD Taxiway "F" ROFA
Environmental Assessment- Contingent upon final grant offer.
Vote: The motion was approved without objection.
31. A RESOLUTION TO ACCEPT AN FAA AIP GRANT IN THE AMOUNT OF $306,023.00 FOR HXD TAXIWAY "F"
ROFA ENVIRONMENTAL ASSESSMENT- CONTINGENT UPON FINAL FAA OFFER.
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve resolution to accept a FAA AIP grant in the amount of $306,023.00 for HXD Taxiway "F" ROFA
Environmental Assessment- Contingent upon final FAA offer.
Vote: The motion was approved without objection.
32. CONTRACT AWARD TO HIGHSMITH CONSTRUCTION, LLC FOR HILTON HEAD ISLAND AIPORT AIR TRAFFIC
CONTROL TOWER (ATCT) RENOVATIONS AND REHABILITATION- CONTINGENT UPON FINAL FAA OFFER.
Motion: It was moved by Council Member Passiment, Seconded by Council Member Dawson to approve
a contract award to Highsmith Construction, LLC for Hilton Head Island Airport Air Traffic Control Tower
(ATCT) Renovations and Rehabilitation- Contingent upon final FAA offer.
Vote: The motion was approved without objection.
33. CONTRACT AWARD TO DEPARTURE MEDIA FOR RFP #032825 FOR AIRPORT TERMINAL ADVERTISING
CONCESSION AT HILTON HEAD ISLAND AIRPORT.
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve a contract award to Departure Media for RFP #032825 for Airport Terminal Advertising
Concession at Hilton Head Island Airport.
Vote: The motion was approved without objection.
34. CONTRACT AWARD TO VOLAIRE AVIATION CONSULTING FOR RFQ #032725 FOR AIR SERVICE
DEVELOPMENT AND MARKETING CONSULTING AT HILTON HEAD ISLAND AIRPORT.
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve a contract award to Volaire Aviation Consulting for RFQ #032725 for Air Service Development
and Marketing Consulting at Hilton Head Island Airport.
Vote: The motion was approved without objection.
35. CONTRACT AWARD TO QUALITY ENTERPRISES USA FOR IFB # 41125 HXD AIRFIELD DRAINAGE PROJECT
($1,217,834) - CONTINGENT UPON FINAL FAA AND SCAC OFFERS.
Motion: It was moved by Council Member Passiment, Seconded by Council Member Tabernik to
approve a contract award to Quality Enterprises USA for IFB #41125 HXD Airfield Drainage Project.
Vote: The motion was approved without objection.
36. APPOINTMENT OF SCOTT SONGER AND MEGAN FITZPATRICK TO THE SOLID WASTE & RECYCLING
BOARD FOR A FOUR-YEAR TERM WITH THE EXPIRATION DATE OF FEBRUARY 2029.
Page 11 of 329
Public Facilities Committee Minutes – Beaufort County, SC
Motion: It was moved by Committee Member Brown, Seconded by Council Member Passiment to
approve the appointments of Scott Songer and Megan Fitzpatrick to the Solid Waste & Recycling Board
for a four-year term with the expiration date of February 2029.
Vote: The motion was approved without objection.
37. REAPPOINTMENT OF JOHN HOLAK TO THE LOWCOUNTRY REGIONAL TRANSPORTATION AUTHORITY
FOR A THREE-YEAR TERM WITH THE EXPIRATION DATE OF FEBRUARY 2028.
Motion: It was moved by Council Member Passiment, Seconded by Ex-Officio Officer Howard to approve
the reappointment of John Holak to the Lowcountry Regional Transportation Authority for a three-year
term with the expiration date of February 2028.
Vote: The motion was approved without objection.
38. ADJOURNMENT
The Committee Chairman adjourned the meeting at 4:10pm.
Ratified:
Page 12 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMEND A CONTRACT AWARD TO WOOD AND PARTNERS FOR THE PLANNING, PERMITTING AND
CONSTRUCTION OVERSIGHT OF BERMUDA BLUFF ($236,850)
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Approve the contract award to Wood and Partners for planning, permitting and construction oversight
services at Bermuda Bluff in the amount of $236,850.
Next Step: If approved by Committee, the item will proceed to full County Council for consideration on
September 8, 2025.
PRESENTER INFORMATION:
Stefanie M. Nagid, Land Preservation Director, 5 minutes
ITEM BACKGROUND:
On December 9, 2024, County Council approved the Local A/H Tax Grant awards, which included $650,000 for
public improvements at Bermuda Bluff. On March 18, 2025, the Land Preservation Director received the award
letter from the County's CFO, which indicates there is a two (2) year time limit to fully expend the grant funds.
On April 29, 2025, County staff advertised a Request For Qualifications (RFQ) for planning, permitting and
construction oversight services to implement the Bermuda Bluff improvements. Nine (9) firms responded to
the RFQ and were subsequently scored and ranked by County staff. Wood and Partners was selected by staff
as the highest ranked best negotiated firm and their fee proposal includes property assessment, community
input, design, probable construction cost estimate, permitting support, and construction oversight support
services in the amount of $236,850. As per the terms and conditions of the Local A/H Tax Grant application,
the Wood and Partners contract will be funded by the Passive Parks 4502 Fund and the grant funds will be
used solely for the construction bid once planning and permitting have been completed.
FISCAL IMPACT:
The Wood and Partners contract amount of $236,850 will be funded from account 4502-80-0000-54420,
which has a current balance of $4,128,938.48. The future construction of this project will be funded with a
FY25 Local A/H Tax Grant award from account 2002-10-0000-54500-PPARK, which has a current balance of
$650,000.
APPROVAL HISTORY:
On December 9, 2024, County Council approved the Local A/H Tax Grant awards, which included $650,000 for
public access improvements at Bermuda Bluff. This contract request is necessary in order to implement the
approved grant award.
Page 13 of 329
PO Box 23949 + Hilton Head Island, SC 29925 + 843.681.6618 + www.woodandpartners.com
July 17, 2025
Victoria Moyer, Deputy Director
Beaufort County Procurement Services
C/O Beaufort County Passive Parks Department
P.O. Drawer 1228
Beaufort, SC 29901-1228
Re: Proposal for Schematic Design through Limited Construction Phase Services for Bermuda Bluff
Passive Use Park
Via Email: Victoria.moyer@bcgov.net; SNagid@bcgov.net
Dear Victoria:
We have prepared the following proposal to provide Schematic Design through Limited Construction Phase Services
for Bermuda Bluff Park, the County-owned parcel located on St. Helena Island. This proposal outlines the Scope of
Services and Compensation, as well as the Client’s responsibilities. The Agreement Terms, Conditions and Hourly
Rates below apply to this agreement. It is our understanding that the Client is Beaufort County’s Passive Parks
Department (Client). Wood+Partners (WP) is the consultant to provide services as outlined below.
Wood+Partners will serve as the Prime Consultant for this project and will provide project management and
Landscape Architectural services. This proposal also includes civil engineering services provided by Ward Edwards
(W/E); Marine Engineering by McSweeney Engineers; Critical Line/Wetland Delineation by Newkirk Environmental
Consultants (NEC); Geotechnical Services by Whitaker Labs; and Surveying by Atlas. No services addressing
threatened/endangered species or archaeology have been included in this proposal but could be added by scope
amendment.
A. General:
1. The general scope of work for this proposal will begin with the flagging of critical line(s) and any discovered
wetlands onsite. A tree and topo survey will then be completed including those flagged lines. A geotechnical
report will also be completed for use by the design team. Information collected will be as required by
permitting and review agencies for permitting to follow; and as necessary to assemble bid/construction
documents for project bidding and construction.
2. The Design Team’s scope includes the preparation of Schematic Design (SD) documents; preparation of
biddable Construction Documents (CDs) with each of those steps supported by cost estimates; facilitation of
community input; permitting; bidding support, and limited Construction Phase Services.
3. It is understood that the County will provide bidding services (with the exception of responding to bidding
questions). Limited bidding and construction phase services with regular NPDES monitoring are included.
4. The scope of work may include the following elements:
a. Improvements to define main drive and drive aisle;
b. Defined parking to include ADA space(s);
c. ADA accessible and permeable trails;
d. New bulkhead/bluff stabilization;
e. ID Sign;
f. Restrooms (limited to portables) with screen enclosure;
g. Site furnishings to include benches, trash receptacles
5. As public water and sewer are not readily available, public water and sewer mains will not be designed or
permitted. Water for fire protection and as a source for irrigation is not anticipated or included.
6. Professional services are limited to by-right uses and development. Development that requires variances,
special uses or rezoning is not included in this proposal.
7. The procurement and delivery method for the project is to be competitive public bidding in a single bid
package that may include the items as outlined above. WP will coordinate with and rely on the County’s
standard procurement documents and bidding process to prepare bid documents.
Page 14 of 329
Bermuda Bluff Park – SD through Limited Construction Phase Services
July 17, 2025
Page 2 of 5
PO Box 23949 + Hilton Head Island, SC 29925 + 843.681.6618 + www.woodandpartners.com
B. Critical Line/Wetland Flagging, Survey and Geotechnical Investigation
1. Flag critical line along with any onsite wetlands for inclusion in project survey.
2. Conduct a tree and topo survey of existing conditions to include critical line and any wetlands located onsite.
Survey work will be limited to approximately 5 acres.
3. Conduct geotechnical evaluation services in support of bulkhead design and pavement design to include
seasonal high groundwater investigation.
4. Utilize survey to prepare base for use by design team
C. Community Input
1. Following the compilation of a base, WP will conduct a Public Open House to obtain community input on the
park. This will consist of a “drop-in” style meeting held onsite. Guests will be able to review a completed
survey/base of the property and provide input by writing on index cards. Promotion of the event will be by
the County. A synopsis of comments will be provided following the event.
D. Schematic Design, Statement of Probable Costs & Initial Permitting:
1. Following the Public Open House and based on follow-up input received from the County, the design team
will prepare Schematic Design (SD) documents for the Client’s approval. The documents shall illustrate and
describe the development of proposed park elements and shall consist of drawings and other documents
including plans and typical construction details to fix and describe the size and character of the Project. The
documents shall also include identification of major materials and systems, establishing their general quality
levels.
2. The design team shall incorporate the design requirements of governmental authorities having jurisdiction over
the Project into the plans.
3. Prepare preliminary drainage calculations for purposes of estimating bioretention size and fulfilling SoLoCo
compliance calculator water quality requirements.
4. Coordinate with design team to obtain necessary documents and input for completion of SD documents.
5. Complete a Preliminary Statement of Probable costs.
6. Meet with the Client to review Schematic Design Documents and obtain input and direction.
7. Following review of Schematic Design documents, a revised CAD plan will be created for use by the design
team.
8. Prepare for and attend Beaufort County Staff Review Team (SRT) pre-application meeting in Beaufort and
investigate design parameters with appropriate agencies (Beaufort County MS4, Fire Marshal, etc.).
(Attendees: Landscape Architect and Civil Engineer)
9. Utilizing Schematic Design documents, submit to SCDHEC- OCRM Coastal Zone Consistency (CZC) to “get
in line” for project review/permitting.
E. Preparation of Construction Documents, Probable Cost Update & Required Final Permitting:
1. Based on approved Schematic Design and input received, prepare biddable construction documents consisting
of plans and written specifications.
a. Coordinate with other design team consultants to include civil engineer, and marine engineer.
b. Documents will include demolition & tree removal/tree protection, site layout, plantings, bulkhead/bluff
stabilization and other critical details such as road, parking, ADA facilities, trails, restroom enclosure (of
portable restrooms), project ID sign, sedimentation and erosion control, grading and storm drainage,
construction details, etc.
c. Update Statement of Probable Costs to reflect modified plans.
d. Begin submittal and coordination to obtain final permitting to include:
(1) MS4 delegated review for SC OCRM (Stormwater)
(2) CZC follow-up and final approval
(3) Local Fire District
(4) Beaufort County Staff Review Team (SRT) Final
2. Based on input received, prepare final bid documents to include plans and written specifications in the form of
a Project Manual.
a. Prepare design calculations and reports associated with civil plans. Reports include:
Page 15 of 329
Bermuda Bluff Park – SD through Limited Construction Phase Services
July 17, 2025
Page 3 of 5
PO Box 23949 + Hilton Head Island, SC 29925 + 843.681.6618 + www.woodandpartners.com
(1) Stormwater Management calculations
(2) Drainage Pipe Calculations
b. Coordinate with design team to consolidate plans; address County input and permitting comments; and
issue final bid documents to County Procurement for advertisement/issuance to bidders.
F. Bidding and Limited Construction Phase Services
1. Our team will assist the County with bidding and construction phase services as noted.
2. Respond to bidders questions during the bid period. All other bidding will be conducted by the County
Procurement Dept.
3. It is anticipated that project construction will occur over a three (3) month period. Should construction extend
beyond that timeframe, additional services may be required.
4. Conduct four (4) Marine Engineer site visits during bulkhead/shoreline stabilization portion of the work.
5. NPDES weekly inspections/monitoring will be provided and documented by W/E in accordance with State
regulations.
6. Support County during construction phase (estimated/budgeted at 3 months) by providing the following
services:
a. One Owner/ Landscape Architect & Civil site visit per month (total of 3 visits for each) to become
familiar with the contractor’s progress and quality of work and determine if it is proceeding in accordance
with contract documents.
b. Assist with responses to contractor requests for information or review submittal information during
construction.
c. Prepare one (1) project substantial completion punch list of identified design deficiencies requiring
corrective action.
d. Prepare one (1) project final completion report
e. Review stormwater as-built survey prepared by contractor’s licensed surveyor.
f. Provide final engineer’s letter for applicable agencies.
g. Request final site inspection from Beaufort County.
h. Prepare and submit civil closeout submittal packages to agencies with jurisdiction over the project.
Needed documents may include notarized signatures, bonds, easements and/or deed(s) from County and
Contractor.
i. Receive and respond to comments received from agencies after initial close-out package submittal.
j. Unless specifically noted, this scope excludes phased close-outs, temporary construction compliance
requests, surety applications and bonded plat approvals.
G. Subsequent and/or Additional Services:
The following subsequent services may be requested and, if so, shall be considered additional services:
1. Preparing multiple concept studies.
2. Providing additional imagery such as 3-D perspectives.
3. Providing environmental consulting services for elements such as threatened and endangered species,
archaeology, asbestos or hazardous waste, etc.
4. Providing regional system stormwater calculations.
5. Attending meetings with local planning staff or other review authorities other than those defined above.
6. Attending Stakeholder, user group or community input meetings other than those defined above.
7. Providing bidding tables or schedule of values.
8. Providing the services of an arborist.
9. Traffic studies or improvements to the access road beyond those defined.
10. Assisting with property rezoning or obtaining variance(s) for proposed development or uses.
11. Providing construction phase services for more than the anticipated/budgeted timeframe.
12. Attending more trips, meetings, or providing other services than listed above.
Page 16 of 329
Bermuda Bluff Park – SD through Limited Construction Phase Services
July 17, 2025
Page 4 of 5
PO Box 23949 + Hilton Head Island, SC 29925 + 843.681.6618 + www.woodandpartners.com
H. Hourly Rates:
Wood+Partners (WP) shall provide planning and landscape architectural services and shall serve as the Consultant
listed herein.
1. For additional services provided on a time and material / hourly basis, compensation shall be at the following
hourly rates (effective May 9, 2023):
Partner/President ....................................................................................................................... $220.00
Sr. Principal ................................................................................................................................. $180.00
Principal ....................................................................................................................................... $170.00
Senior Project Manager ............................................................................................................. $155.00
Project Manager ......................................................................................................................... $130.00
Landscape Architect/Sr. Planner ............................................................................................ $115.00
Landscape Architect/Planner .................................................................................................. $ 95.00
Project Planner ........................................................................................................................... $ 90.00
Administrative/Controller ........................................................................................................ $ 90.00
Administrative/Marketing Coordinator ................................................................................. $ 90.00
2. For Consultant’s Hourly Additional Services compensation shall be at the following hourly rates:
Principal (Civil) ........................................................................................................................... $235.00
Engineer 4 (Marine) ................................................................................................................... $200.00
Project Manager (Civil) ............................................................................................................. $195.00
Engineer 3 (Marine) ................................................................................................................... $187.00
Engineer 3 (Structural) .............................................................................................................. $175.00
Lead Engineer (Civil) ................................................................................................................. $175.00
Construction Consultant (Civil) ............................................................................................... $160.00
Engineer 1 (Marine or Structural) ........................................................................................... $150.00
Engineering Technician (Civil) ................................................................................................ $130.00
I. Compensation & Expenses:
Compensation for this project shall be on a lump sum basis. Fees for proposed services are as outlined below, plus
reimbursable expenses and shall be billed monthly on a percent complete basis for each phase of service as follows:
1. Critical Line/Wetland Flagging, Survey & Geotechnical Investigation................................................ $ 18,400
2. Community Input ......................................................................................................................................... $ 2,900
3. Schematic Design & Statement of Probable Cost ................................................................................... $ 28,100
4. Construction Documents & Probable Cost Update ................................................................................ $ 71,750
5. Initial & Final Permitting ............................................................................................................................ $ 50,400
6. Bidding & Limited Construction Phase Services ..................................................................................... $ 49,800
Reimbursable expenses are in addition to the fees outlined above. Reimbursable expenses are estimated but not
guaranteed to be $15,500 .
Page 17 of 329
Bermuda Bluff Park – SD through Limited Construction Phase Services
July 17, 2025
Page 5 of 5
PO Box 23949 + Hilton Head Island, SC 29925 + 843.681.6618 + www.woodandpartners.com
Thank you for the opportunity to work with you on this project. Please let me know if you have any questions about
the services outlined above. As an act of acceptance please sign this agreement, scan and email a copy to us.
Sincerely,
Wood+Partners Client Beaufort County, South Carolina
,LS Accepted ,LS
Name: Kyle Theodore, PLA, ASLA Name:
Title: Sr. Vice President Title:
Date: July 17, 2025 Date:
Cc: Trey Griffin, PLA, ASLA, Principal
Page 18 of 329
Approximate limits of work
Page 19 of 329
REQUEST FOR QUALIFICATION
BERMUDA BLUFF PARK IMPROVEMENTS
RFQ # 042925
Prepared By: Passive Parks
Dated: Tuesday, March 25, 2025
Proposal Due Date: Tuesday, April 29, 2025, 3:00 pm (EST)
Page 20 of 329
RFQ #042925 DOCUMENTS Page 2
NOTICE
COUNTY COUNCIL OF BEAUFORT COUNTY
PROCUREMENT SERVICES DEPARTMENT
106 Industrial Village Road, Bldg. 2 Post Office Drawer 1228
Beaufort, South Carolina 29901-1228
PROPOSAL NOTICE NO. 042925
CLOSING DATE AND TIME: Tuesday, April 29, 2025, 3:00 pm
PROPOSAL TITLE: Bermuda Bluff Park Improvements
You are invited to submit a qualification statement, in accordance with the requirements of this
solicitation which are contained herein.
There will be a Non-Mandatory Pre-Proposal meeting at 2:00 pm (EST) on Tuesday, April 1,
2025 at This is a virtual meeting. Email victoria.moyer@bcgov.net to receive your invite.
Please contact Victoria Moyer at victoria.moyer@bcgov.net for the meeting link. All vendors are
encouraged to attend.
In order for your qualification statement to be considered, it must be submitted through the
Procurement Portal no later than 3:00 pm (EST) on Tuesday, April 29, 2025 , at which time
respondents to this request will be recorded in the presence of one or more witnesses. RFQs
received after the time specified will not be considered. Due to the possibility of negotiation with
all respondents, the identity of any respondents or the contents of any proposal shall not be public
information until after the c ontract award is made; therefore, the public is not invited to the
proposal closing.
Proposals must be submitted through the Procurement Portal at
https://procurement.opengov.com/portal/bcgov. If you are not already registered, please
register as a Vendor. There is no cost to register your company. This will allow you to submit
your RFQ electronically.
All submittals (see Submission Requirements ) received in response to this Request for
Qualifications will be rated by a Selection Committee, based upon the Evaluation
Criteria contained within this RFQ. If the best proposal respondent is clearly identified from the
point summary, there will not be a need for oral presentations. If not, then an or al presentation
from a minimum of the top two rated firms shall be required.
This solicitation does not commit Beaufort County to award a contract, to pay any costs incurred
in the preparation of a proposal, or to procure or contract for the articles of goods or services. The
County reserves the right to accept or reject any or all qualifications received as a result of this
request, to negotiate with all qualified firms, or to cancel in part or in its entirety this solicitation,
if it is in the best interests of the County to do so.
Page 21 of 329
RFQ #042925 DOCUMENTS Page 3
Dave Thomas, Procurement Services Director
(843) 255-2304
Page 22 of 329
RFQ #042925 DOCUMENTS Page 4
IMPORTANT ELECTRONIC SUBMITTAL REQUIREMENTS
Response submittals for this Request for Qualifications will ONLY be received electronically and
must be submitted ONLINE, through the Procurement Portal, no later than 3:00 pm on Tuesday,
April 29, 2025.
All responses must adhere to the following guidelines:
• Suppliers are encouraged to submit responses as soon as possible. Responses are received
through our secure Procurement Portal and cannot be opened prior to the due date and
time. The time and date of receipt as recorded by the server will serve as the official time
of receipt. The County is not responsible for late submissions, regardless of the reason.
• All requested information and forms MUST be uploaded as indicated in the
PROPOSAL SUBMITTAL Section. If you have a problem with your submittal, you
may contact Support through the Procurement Portal.
Page 23 of 329
RFQ #042925 DOCUMENTS Page 5
TITLE VI STATEMENT
COUNTY COUNCIL OF BEAUFORT COUNTY
Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and
Consultants
It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as
“Beaufort County” or “th e County”, to comply with Title VI of the 1964 Civil Rights Act (Title
VI) and its related statutes. To this end, Beaufort County assures that no person shall be excluded
from participation in, denied the benefit of, or subjected to discrimination under a ny of its
programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or
language regardless of whether those programs and activities are Federally funded or not. The
County is also committed to assuring every effo rt will be made to prevent the discrimination of
low-income and minority populations as a result of any impact of its programs or
activities. Beaufort County also assures that every effort will be made to prevent discrimination
through the impacts of its programs, policies, and activities on minority and low -income
populations. Additionally, the County will take reasonable steps to provide meaningful access to
services for persons with limited English proficiency. In addition, Beaufort County will not
retaliate against any person who complains of discrimination or who participates in an
investigation of discrimination. Beaufort County will, where necessary and appropriate, revise,
update, and incorporate nondiscrimination requirements into appropriate docu ments, directives,
and regulations.
Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County
including, but not limited to Prime Contractors, Subcontractors, Architects, Engineers, and
Consultants, may not discriminate on the basis of race, color, national origin, age, sex, disability,
religion, or language in their selection and retention of first -tier subcontractors, and first -tier
subcontractors may not discriminate in their election and retention of second -tier subcontractors,
including those who supply materials and/or lease equipment. Further, Contractors may not
discriminate in their employment practices in connection with highway construction projects or
other projects assisted by the U.S. Department of Transpor tation (USDOT) and/or the Federal
Highway Administration (FHWA).
In all solicitations either by competitive bidding or negotiation made by the Contractor for
work to Beaufort County to be performed under a subcontract, including procurements of
materials or leases of equipment, each potential subcontractor or supplier shall be notified
by the Contractor of the Contractor's obligations under the contract and the Title VI
regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex,
disability, religion, or language by providing such a statement in its bidding and contract
documents.
Page 24 of 329
RFQ #042925 DOCUMENTS Page 6
Upon request, the Contractor shall provide all information and reports required by Title VI
requirements issued pursuant thereto, and shall per mit access to its books, records, accounts and
other sources of information, and its facilities as may be determined by Beaufort County, USDOT,
and/or FHWA to be pertinent to ascertain compliance with such regulations, orders, and
instructions. Where any information required of a Contractor is in the exclusive possession of
another who fails or refuses to furnish this information, the Contractor shall so certify to USDOT
or FHWA, as appropriate and via Beaufort County, and shall set forth what efforts it h as made to
obtain the information. In the event of the Contractor's non -compliance with nondiscrimination
provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may
determine to be appropriate, including, but not limited to:
• Withholding of payments to the Contractor under the contract until the Contractor
complies, and/or
• Cancellation, termination, or suspension of the contract, in whole or in part.
In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor
or supplier as a result of this direction to comply with Title VI, the Contractor may request USDOT
to enter into such litigation to protect the interests of USDOT and FHWA. Additionally, the
Contractor may request the United States to enter into such litigation to protect the interests of the
United States. Any person or Subcontractor who believes that they have been subjected to an
unlawful discriminatory practice under Title VI has a right to file a formal complaint within one
hundred eighty (180) days following the alleged discriminatory action. Any such complaint must
be filed in writing or in person:
Beaufort County Government
Post Office Drawer 1228 | Beaufort, SC 29901-1228
843-255-2304 Telephone | E-mail: dthomas@bcgov.net
Page 25 of 329
RFQ #042925 DOCUMENTS Page 7
SCOPE OF WORK
4.1. Scope of Work
A. Create Construction Drawings for public access improvements.
1. This task may entail obtaining data for tree and topo surveys, shoreline surveys,
environmental reviews, and coordination/meetings with County departments and/or
State agencies.
2. This task also includes one (1) on site public meeting to obtain public feedback prior
to plan completion.
B. Obtain Development permits from the County and State.
1. This task may entail various meetings with County and State staff and revisions to
draft plans based on feedback.
C. Provide Construction Administration services during the bidding and construction
process.
1. This task may entail coordination with County staff in answering vendor questions,
reviewing and approving submittals, attending on site monthly contractor meetings,
and other related activities.
QUALIFICATION SUBMISSION INSTRUCTIONS
A. Award shall be posted on the County's Procurement Portal.
B. Prohibition of Gratuities: It shall be unethical for any person to offer, or give, or agree to
give any County employee or former County employee, or for any County employee or
former County employee to solicit, demand, accept, or agree to accept from another
person, a gratuity or an offer of employment in connection with any decision, approval,
disapproval, recommendation, or preparation of any part of a purchase request,
influencing the content of any specification or procurement standard, rendering of advice,
investigation, auditing, or in any other advisory capacity in any proceeding or
application, request for ruling, determination, claim or controversy, or other particular
matter, pertaining to any program requirement or a contract or subcontract, or to any
solicitation or proposal therefore.
C. Questions
1. Submit questions you have through the Procurement Portal no later than 5:00 pm on
Monday, April 21, 2025.
Page 26 of 329
RFQ #042925 DOCUMENTS Page 8
2. Answers to questions received that would change and/or clarify this solicitation will
be posted on the Procurement Portal as addendum.
3. Selection Committee members SHALL NOT be contacted during the RFP process.
D. In order to do business with the Beaufort County, vendors must register through the
Procurement Portal at https://procurement.opengov.com/portal/bcgov. Registering allows
businesses to identify the type of goods and services they provide so that they may
receive email notifications regarding relevant solicitations out for bid.
EVALUATION CRITERIA
Phase 1
No. Evaluation Criteria Scoring Method Weight (Points)
1. Experience and Knowledge
Experience and knowledge with local, state,
and federal regulations, permitting and
design/construction of similar facilities.
Consultant to disclose the type and number of
projects performed for Beaufort County or its
municipalities over the last 5 years
Points Based 25
(25% of Total)
2. Local Conditions
Knowledge of local conditions and potential
challenges to be considered in developing the
project. The ability to address and solve
challenges in the design and construction
process.
Points Based 25
(25% of Total)
3. Design and Analysis
Ability to provide various design options, to
evaluate cost-benefit analysis, taking
construction and maintenance costs into
consideration.
Points Based 25
(25% of Total)
4. Reference and Effectiveness
Track record in meeting deadlines, achieving
positive results, and providing most cost
effective/best options to implement.
Points Based 25
(25% of Total)
Phase 2
No. Evaluation Criteria Scoring Method Weight (Points)
Page 27 of 329
RFQ #042925 DOCUMENTS Page 9
1. Experience and Knowledge
Experience and knowledge with local, state,
and federal regulations, permitting and
design/construction of similar facilities.
Consultant to disclose the type and number of
projects performed for Beaufort County or its
municipalities over the last 5 years
Points Based 25
(25% of Total)
2. Local Conditions
Knowledge of local conditions and potential
challenges to be considered in developing the
project. The ability to address and solve
challenges in the design and construction
process.
Points Based 25
(25% of Total)
3. Design and Analysis
Ability to provide various design options, to
evaluate cost-benefit analysis, taking
construction and maintenance costs into
consideration.
Points Based 25
(25% of Total)
4. Reference and Effectiveness
Track record in meeting deadlines, achieving
positive results, and providing most cost
effective/best options to implement.
Points Based 25
(25% of Total)
Phase 3
No. Evaluation Criteria Scoring Method Weight (Points)
1. N/A
N/A
Points Based 10
(100% of Total)
Phase 4
No. Evaluation Criteria Scoring Method Weight (Points)
1. N/A
N/A
Points Based 10
(100% of Total)
Phase 5
No. Evaluation Criteria Scoring Method Weight (Points)
1. N/A
N/A
Points Based 10
(100% of Total)
QUALIFICATION SUBMITTAL
Page 28 of 329
RFQ #042925 DOCUMENTS Page 10
1. Firm confirms the proposal is firm for a period of at least 90 days from the closing date
for submission of proposal.*
☐ Please confirm
*Response required
2. Certification regarding Debarment, Suspension, Ineligibility, and Voluntary exclusion*
The contractor certifies, by submission of this qualification statement or acceptance of a contract,
that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared
ineligible, or voluntarily excluded from participation in this transaction by any State, Federal
department, or agency.
It further agrees by submitting this qualification statement that it will include this clause without
modification in all lower tier transactions, solicitations, proposals , contracts, and subcontracts.
Where the bidder/contractor or any lower tier participant is unable to certify to this statement, it
shall attach an explanation to this solicitation/bid.
☐ Please confirm
*Response required
3. Has your company been involved in any litigation within the past five (5) years, arising
out of your performance. *
☐ Yes
☐ No
*Response required
When equals "Yes"
3.1. Explain fully any litigation involving performance.*
*Response required
4. Non-Segregated Facilities*
CERTIFICATION BY CONTRACTOR
Regarding
NON-SEGREGATED FACILITIES
The Bidder certifies that he does not, and will not, provide and maintain segregated facilities for
his employees at his establishments and, further that he does not, and will not, permit his
employees to perform their services at those locations, under hi s control, where segregated
facilities are provided and maintained. Segregated fountains, transportation, parking,
entertainment, recreation, ad housing facilities; waiting, rest, wash, dressing, and locker room, and
time clock, work, storage, restaurant, and other eating areas which are set apart in fact, or by
explicit directive, habit, local custom, or otherwise, based on color, creed, national origin, and
race. The Bidder agrees that, except where he has obtained identical certifications from proposed
subcontractors for specific time periods, he will obtain identical certifications from proposed
Page 29 of 329
RFQ #042925 DOCUMENTS Page 11
subcontractors prior to the award of subcontractors exceeding $10,000.00 which are not exempt
from the provisions of the Equal Opportunity clause, and that he wi ll retain such certifications in
his files.
The Bidder agrees that a breach of this certification is a violation of the Equal Opportunity clause
in this Contract. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
☐ Please confirm
*Response required
5. Please upload any relevant certifications and/or licenses
6. Qualification Statement*
To achieve a uniform review process and allow for adequate comparability, the information is to
be organized in the manner specified below and the en tire package must not exceed 15 double -
sided printed pages excluding cover pages. Please include a cover page at the start of each section.
A. Executive Summary: Objectives of the project, scope of work, and related issues which
must be addressed throughout development stages of the planning.
B. Approach to the Firms Planning Process: Explanation of the process to the Firm's
planning process for projects
C. Work Plan and Scheduling: A summary of tasks to be performed from evaluation of
data through County approval of the final plan. Include a timeline of key milestone dates
to include overall durations for each major task.
D. Experience and Qualifications: Experience and qualifications of the team members,
with an emphasis on similar type project completed within the last five (5) years. Provide
an organization chart including sub-consultants and contractors.
E. List any exceptions, qualifications, or exclusions to this RFQ:
*Response required
RESERVED RIGHTS
The County shall not be responsible for any of the costs associated with responding to this request
and all submitted materials shall become the property of the County. Furthermore, the County
expressly reserves the right and options to:
• Reject any or all consultants and re-advertise if deemed necessary
• Waive any or all formalities and technicalities
• Approve, disapprove, or cancel all services associated with the project
Page 30 of 329
RFQ #042925 DOCUMENTS Page 12
The County has yet to decide whether to select one or more other firms to provide some or all of
the professional services described in this document. All selected firms will perform such services
under the direct supervision of Beaufort County.
SELECTION AND NOTIFICATION
The selected firms will be given written notification of being selected by the County. This work
may be awarded in whole or in part at the sole discretion of the County. The County will negotiate
and execute a contract with the selected firm(s) prior to the beginning of the actual services. Should
contract negotiations fail, the County will negotiate with one or the other highly ranked firms. In
general, the contract will comply with applicable laws and standard provisions and shall contain
the following terms:
• Detailed scope of services
• Schedule for providing services
BEAUFORT COUNTY STANDARDS FOR CONTRACTING
CHAPTER 1. TYPES OF CONSULTANT SERVICES REQUIRED:
Please see Scope of Work Section.
CHAPTER 2. PROCEDURES FOR SELECTION OF CONSULTANTS
2-1. GENERAL
Qualifications-based procedures require that a contract for consulting services be awarded
pursuant to a fair and open selection process based on the qualifications of the firms. The fees for
such services are established following selection of a firm through a negotiation process to
determine a fair and reasonable price.
2-2. OBJECTIVE
Consultants employed for work on projects shall be responsible and possess the ability to perform
successfully under the terms and conditions of the proposed procurement. Consideration shall be
given to such matters as integrity, record of past performance, extent of experience with the type
of services required by the sponsor, technical resources, and accessibility to other necessary
resources.
2-3. QUALIFICATIONS-BASED SELECTION PROCEDURES.
Consultants shall be selected based on their qualifications and experience, with fees determined
through negotiations following selection. The highest ranked offeror shall be selected, and
price proposals shall be negotiated with one or more of the firms identified through the
qualifications-based selection procedure.
2-4. SELECTION CRITERIA.
Page 31 of 329
RFQ #042925 DOCUMENTS Page 13
Criteria include, but are not limited to, the following:
A. Please see the Evaluation Criteria Section.
CHAPTER 3. CONTRACT FORMAT
3-1. MANDATORY CONTRACT PROVISIONS.
All contracts involving State or Federal funds must contain the applicable procurement standards
in 49 CFR 18.36. Listed below are those provisions which pertain to consultant contracts:
A. Contracts shall contain provisions or conditions which will allow for administrative,
contractual, or legal remedies in instances where contractors violate or breach contract
terms and provide for sanctions and penalties as may be appropriate.
B. Contracts over $10,000 shall contain suitable provisions for termination by the sponsor,
including how it will be affected and the basis for settlement. In addition, contracts shall
describe conditions under which the contract may be terminated for default as well as
conditions where the contract may be terminated because of circumstances beyond the
control of the consultant.
C. All negotiated contracts shall include provisions to the effect that sponsors, the Federal
Department of Transportation, the Comptroller General of the United States, or any of the
duly authorized representatives shall have access to any books, documents, papers, and
records of consultants which are directly pertinent to a specific grant program, for the
purpose of making audits, examinations, excerpts, and transcriptions. Sponsors shall
require consultants to maintain all required records for 3 years after the sponsor makes
final payment and all other pending matters are closed.
D. In addition to the requirements contained in 49 CFR Section 23, Participation by
Minority Business Enterprises in Department of Transportation Programs, and AC
150/5100-15, Civil Rights Requirements for the Airport Improvement Program, current
edition, the Title VI, and Disadvantaged Business Enterprise Assurances in Appendix 1
shall be included in each contract.
3-2. TIME OVERRUNS BEYOND CONTROL OF THE CONSULTANT.
Frequently, the consultant is called upon to continue technical inspection services on construction
contracts--overrunning the program schedule contemplated at the time of negotiation. In most
instances, the time element is beyond the control of the consultant. To provide for the contingency
of overrun of time, the agreement between the County and the consultant will state the period for
which the compensation shall apply and that the consultant shall be reimbursed for services in
excess of the specified period of time at a mutually acceptable fee negotiated at the time all the
pertinent circumstances are known.
CHAPTER 4. METHODS OF CONTRACTING AND ALLOWABLE COSTS
Page 32 of 329
RFQ #042925 DOCUMENTS Page 14
4-1. ALLOWABLE COSTS.
A. Direct Salary Costs.
1. Direct salary cost is defined as the cost of salaries of engineers, draftsmen, surveyors,
stenographers, clerks, etc., for time directly chargeable to the project.
2. Salaries or imputed salaries of partners or principals, to the extent that they perform
technical or advisory services directly applicable to the project, are to be added to
salary cost.
B. Overhead Costs. Overhead costs include overhead on direct salary costs and general and
administrative overhead.
1. Labor Overhead. Overhead on direct salary costs includes sick leave, vacation, and
holiday pay; unemployment, excise, and payroll taxes; contributions for social
security, employment compensation insurance, retirement benefits, and medical
insurance benefits; and any other benefits customarily paid to or enjoyed by all
employees. The allowable percentage for labor overhead allocable to a project is the
ratio of (a) a firm's total direct labor overhead costs to (b) a firm's total direct salary
costs (excluding overtime) for a given period, usually the average for the past 3 years.
2. General and Administrative Overhead. General and administrative overhead includes
the following indirect costs which are not directly attributable to specific projects.
a. Provisions for office, light, heat, and similar terms for working space,
depreciation allowances or rental for furniture, drafting equipment and
engineering instruments, and office and drafting supplies not identifiable to
specific projects.
b. Taxes and insurance other than those included as salary cost but excluding state
and Federal income taxes.
c. Library and periodical expenses, and other means of keeping abreast of advances
in engineering such as attendance at technical and professional meetings and
subscriptions to trade, business, professional, or technical periodicals.
d. Executive, administrative, accounting, legal, stenographic, and clerical salaries,
and expenses (other than identifiable salaries included in salary costs and
expenses included in reimbursable non-salary expenses, plus salaries or imputed
salaries of partners and principals) to the extent that they perform general
executive and administrative services as distinguished from technical or advisory
services directly applicable to projects.
Page 33 of 329
RFQ #042925 DOCUMENTS Page 15
e. Costs of memberships in trade, business, technical, and professional
organizations.
f. Incentive compensation for management employees, cash bonuses, suggestion
awards, safety awards, and incentive compensation based on production, cost
reduction, or efficient performance are allowable to the extent that the overall
compensation is determined to be reasonable, and such costs are paid or accrued
pursuant to an agreement entered into in good faith between the consultant and
the employees before the services are rendered or pursuant to an established plan
followed by the consultant so consistently as to imply, in effect, an agreement to
make such payment. The allowable percentage for general and administrative
overhead allocable to a project is the ratio of (a) all general and administrative
costs to (b) total direct salary costs (excluding overtime) for a given period,
usually the average for the past 3 years.
C. Direct Non-salary Expenses. Direct non-salary expenses usually incurred may include the
following (detailed records must be kept supporting charges and allow auditing):
1. Living and traveling expenses of employees, partners, and principals when away from
the home office on business connected with the project. (Records must include
employee name, dates, points of travel, mileage rate, lodging, and meals.)
2. Identifiable communication expenses such as long-distance telephone, telegraph,
cable, express charges, and postage, other than for general correspondence.
3. Services directly applicable to the work such as special legal and accounting
expenses, computer rental and programming costs, special consultants, borings,
laboratory charges, commercial printing and bindings, and similar costs that is not
applicable to general overhead.
4. Identifiable drafting supplies and stenographic supplies and expenses charged to the
sponsor's work as distinguished from such supplies and expenses that are applicable
to two or more projects.
5. Identifiable reproduction costs applicable to the work such as blueprinting,
photosetting, mimeographing, printing, etc.
6. Advertising costs which are solely for the recruitment of personnel required for the
performance by the consultant of obligations arising under the contract.
4-2. NON-ALLOWABLE COSTS.
The expenses listed below are not allowable for reimbursement:
Page 34 of 329
RFQ #042925 DOCUMENTS Page 16
A. Costs of amusement and social activities and incidental costs relating thereto such as
meals, lodging, rentals, transportation, and gratuities.
B. Contributions and donations.
C. Bad debts, including losses due to uncollectible customer's accounts and other claims,
related collection costs, and related legal costs, arising from other businesses of the
consultant.
D. Dividend provisions or payments and, in the case of sole proprietors and partners,
distributions of profit.
E. Interest on borrowed capital.
F. Bonus payment for early completion of work.
4-3. FIXED PAYMENT.
To all the estimated costs, including overhead, a percentage rate is applied to determine payment
for profit, willingness to serve, and assumption of responsibility.
CHAPTER 5. BEAUFORT COUNTY STANDARD CLAUSES
CONTRACTUAL REQUIREMENTS
1.0 EXCUSABLE DELAY : The Contractor shall not be liable for any excess costs, if the
failure to perform the contract arises out of causes beyond the control and without the fault or
negligence of the Contractor. Such causes may include, but are not restricted to, acts of God or of
the public enemy, acts of the Government in either its sovereign or contractual capacity, fires,
floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe
weather; but in every case the failure to perform must be beyond the control and without the fault
or negligence of the Contractor. If the failure to perform is caused by the default of a
subcontractor, and if such default arises out of causes beyond the control of both the Contractor
and the subcontractor, and without the fault or negligence of either of them, the Contractor shall
not be liable for any excess costs for failure to perform, unless the supplies or services to be
furnished by the subcontractor were obtainable from other sources in sufficient time to permit the
Contractor to meet the required delivery schedule.
2.0 S.C. LAW CLAUSE: Upon award of a contract under this Request for PROPOSALS, the
person, partnership, association, or corporation to whom the award is made must comply with local
and State laws which require such person or entity to be authorized and/or licensed to do business
in Beaufort County. Notwithstanding the fact that applicable statutes may exempt or exclude the
successful offeror from requirements that it be authorized and/or licensed to do business in
Beaufort County, by submission of this signed Request for PROPOSALS the offeror agrees to
subject itself to the jurisdiction and process of the Fourteenth Judicial Circuit Court of Beaufort
County, as to all matters and disputes arising or to arise under the contract and the performance
Page 35 of 329
RFQ #042925 DOCUMENTS Page 17
thereof including any questions as to the liability for taxes, licenses, or fees levied by State or local
government.
3.0 OFFEROR’S PROPOSALS: Offeror must, upon request of the County, furnish satisfactory
evidence of their ability to furnish products or services in accordance with the terms and conditions
of this Request for PROPOSALS. The Procurement Services Department reserves the right to
make the final determination as to the offeror’s ability to provide the services requested herein,
before entering into any contract.
4.0 OFFEROR RESPONSIBILITY: Each offeror shall fully acquaint himself with conditions
relating to the scope and restrictions attending the execution of the work und er the conditions of
this Request for PROPOSALS. It is expected that this will sometimes require on -site
observation. The failure or omission of an offeror to acquaint themselves with existing conditions
shall in no way relieve him of any obligation with respect to this Request for PROPOSALS or to
the contract.
5.0 AFFIRMATIVE ACTION: The Contractor will take affirmative action in complying with
all Federal and State requirements concerning fair employment and employment of the
handicapped and concerning the treatment of all employees, without regard or discrimination by
reason of race, religion, sex, national origin, or physical handicap.
6.0 PRIME CONTRACTOR RESPONSIBILITIES: The Contractor will be required to assume
sole responsibility for the complete effort, as required by this RFP. The County will consider the
Contractor to be the sole point of contact with regard to contractual matters.
7.0 SUBCONTRACTING: If any part of the work covered by this RFP is to be subcontracted,
the Cont ractor shall identify the subcontracting organization and the contractual arrangements
made with same. All subcontractors must be approved, in writing by the County, or when
applicable a political subdivision within the County with the County’s concurrenc e. The
successful offeror will also furnish the corporate or company name and the names of the officers
of any subcontractors engaged by the vendor. The County reserves the right to reject any or all
subcontractors and require substitution of a firm qual ified to participate in the work as specified
herein.
8.0 OWNERSHIP OF MATERIAL : Ownership of all data, material, and documentation
originated and prepared for the County pursuant to this contract shall belong exclusively to the
County.
9.0 PERFORMANCE AND PAYMENT BONDS: (NOT Required for Professional Services)
The successful Contractor shall furnish, within ten (10) days after written notice of acceptance of
Request for PROPOSALS, Performance and Payment Bonds. Contractor shall provide and pay
the cost of a both bonds. The Bonds shall be in the amount of one hundred percent (100%) the
contract, issued by a Surety Company licensed in South Carolina with an “A” minimum rating of
performance as stated in the most current publication of “Best’s Ke y Rating Guide, Property
Liability” which shall show a financial strength rating of at least five (5) times the Contract
Page 36 of 329
RFQ #042925 DOCUMENTS Page 18
Price. The Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact
to bind the surety and certified to include the date of the bond.
10.0 NONRESIDENT TAXPAYERS: If the offeror is a South Carolina nonresident taxpayer
and the contract amount is $10,000.00 or more, the offeror acknowledges and understands that in
the event he is awarded a contract offeror shall submit a Nonresident Taxpayer Registration
Affidavit (State form #1 -312-6/94), before a contract can be signed. Affidavit must certify that
the nonresident taxpayer is registered with the S.C. Department of Revenue or the S.C. Secretary
of State’s Office, in accordance with Section 12-9-310(A) (2) (3) of S.C. Code of Laws (1976) as
amended.
11.0 BUSINESS LICENSE In accordance with the Beaufort County Business License
Ordinance, 99 -36, Article III, as enacted November 22, 1999, any business or in dividual
generating income in the unincorporated area of Beaufort County is required to pay an annual
license fee and obtain a business license. The ordinance referenced is available on the Beaufort
County website at www.beaufortcountysc.gov or by calling the Business License Administrator at
(843) 255-2270 for a list of schedules.
12.0 ADDITIONAL ELIGIBILITY: Other Beaufort County Public Procurement units shall, at
their option, be eligible for use of any contracts awarded pursuant to this Invitation.
13.0 INSURANCE REQUIREMENTS : Prior to commencing work/delivery hereunder,
Contractor/Vendor, at his expense, shall furnish insurance certification showing the certificate
holder as Beaufort County, P.O. Drawer 1228, Beaufort, SC 29901-1228, Attention: Procurement
Services Director and with a special notation naming Beaufort County as an additional insured on
the liability coverage. Minimum coverage shall be as follows:
A. Worker’s Compensation Insurance - Contractor shall have and maintain, during the life
of this contract, Worker’s Compensation Insurance for his employees connected to the
work/delivery, in accordance with the Statutes of the State of South Carolina and any
applicable laws.
B. Commercial General Liability Insurance – Contractor shall have and maintain, during the
life of this contract, Commercial General Liability Insurance. Said Commercial General
Liability Policy shall contain Contractual Liability and Products/Completed Operations
Liability subject to the following minimum limits: $1,000,000 Each Occurrence/
$2,000,000 General Aggregate and $2,000,000 Products/Completed Operations
Aggregate naming Beaufort County as an additional insured.
C. Comprehensive Automobile Liability Insurance - The Contractor shall have and
maintain, during the life of this contract, Comprehensive Automobile Liability, including
non-owned and hired vehicle, of at least $500,000 COMBINED SINGLE LIMIT.
Page 37 of 329
RFQ #042925 DOCUMENTS Page 19
D. ADDITIONAL INSURANCE REQUIREMENT: Umbrella Liability Insurance –
Contractor shall have and maintain, during the life of this contract, Umbrella Liability
Insurance with a minimum limit of $2,000,000
E. Professional Liability (Errors & Omissions) – The vendor shall maintain a limit no less
than $1,000,000 per occurrence.
F. The required insurance policy at the time of issue must be written by a company licensed
to do business in the State of South Carolina and be acceptable to the County.
G. The Contractor/vendor shall not cause any insurance to be canceled or permit any
insurance to lapse. All insurance policies shall contain a clause to the effect that the
policy shall not be canceled or reduced, restricted, or limited until fifteen (15) days after
the County has received written notice, as evidenced by return receipt of registered or
certified letter. Certificates of Insurance shall contain transcript from the proper office of
the insurer, the location, and the operations to which the insurance applies, the expiration
date, and the above-mentioned notice of cancellation clause.
H. The information described above sets forth-minimum amounts and coverages and is not
to be construed in any way as a limitation on the Contractor’s liability.
14.0 INDEMNITY:
The Contractor hereby agrees to indemnify and save harmless the County, its officers, agents, and
employees from and against any and all liability, claims, demands, damages, fines, fees, expenses,
penalties, suits, proceedings, actions and cost of actions, including attorney’s fees for trial and on
appeal of any kind and nature arising or growing out of or in any way connected with the
performance of the Agreement, whether by act of omissions of the Contractor, its agents, servants,
employees or others, or because of or due to the mere existence of the Agreement between the
parties.
15.0 TERMINATION FOR DEFAULT:
15.1 The performance of Work under the Agreement may be terminated by the
Procurement Services Director, in accordance with this clause, in whole or in part, in
writing, whenever the Director of Procurement Services shall determine that the Contractor
has failed to meet the performance requirements of this Agreement.
15.2 The Procurement Services Director has the right to terminate for de fault, if the
Contractor fails to make delivery of the supplies or perform the Work, or if the Contractor
fails to perform the Work within the time specified in the Agreement, or if the Contractor
fails to perform any other provisions of the Agreement.
16.0 TERMINATION FOR CONVENIENCE: The County may without cause terminate this
contract in whole or in part at any time for its convenience. In such instance, and adjustment shall
be made to the Contractor, for the reasonable costs of the work performed t hrough the date of
Page 38 of 329
RFQ #042925 DOCUMENTS Page 20
termination. Termination costs do not include lost profits, consequential damages, delay damages,
unabsorbed or under absorbed overhead of the Contractor or its subcontractors, and/or failure to
include termination for convenience clause into its subcontracts and material purchase orders shall
not expose the County to liability for lost profits in conjunction with a termination for convenience
settlement or equitable adjustment. Contractor expressly waives any claims for lost profit or
consequential damages, delay damages, or indirect costs which may arise from the County’s
election to terminate this contract in whole or in part for its convenience.
17.0 TERMINATION FOR NON -APPROPRIATIONS: Funds for this contract are payable
from Sta te and/or Federal and/or Beaufort County appropriations. In the event sufficient
appropriations are not made to pay the charges under the contract it shall terminate without any
obligation to Beaufort County.
SPECIAL INSTRUCTIONS
1.0 INTENT TO PERFORM: It is the intent and purpose of Beaufort County that this request
permits competition. It shall be the offeror’s responsibility to advise the Procurement Services
Department if any language, requirements, etc., or any combinations thereof inadvertently restricts
or limits the requirements stated in this RFP to a single source. Such notification must be
submitted in writing and must be received by the Procurement Services Department not later than
ten (10) days prior to the Request for PROPOSALS opening date. A review of such notifications
will be made.
2.0 RECEIPT OF REQUEST FOR PROPOSALS: Request for Proposals, amendments thereto,
or withdrawal requests received after the time advertised for Request for Proposals opening will
be void, regardless of when they were mailed.
3.0 PREPARATION OF REQUEST FOR PROPOSALS
3.1 All Requests for PROPOSALS should be complete and carefully worded and must
convey all of the information requested by the County. If significant errors are found in the
offeror’s Request for PROPOSALS, or if the Request for PROPOSALS fails to conform to
the essential requirements of the RFP, the County and the County alone will be the judge as
to whether that variance is significant enough to reject the Request for PROPOSALS.
3.2 Request for PROPOSALS should be prepared simply and economically, providing
a straightforward, concise description of offerors capabilities to satisfy the requirements of
the RFP. Emphasis should be on completeness and clarity of content.
3.3 Each copy of the Request for PROPOSALS should be bound in a single volume
where practical. All documentation submitted with the Request for PROPOSALS should
be bound in that single volume.
3.4 If your Request for PROPOSALS includes any comment over and above the specific
information requested in our Request for Request for PROPOSALS (RFP), you are to
include this information as a separate appendix to your Request for PROPOSALS.
Page 39 of 329
RFQ #042925 DOCUMENTS Page 21
4.0 AMENDMENTS: If it becomes necessary to revise any part of the RFP, an amendment
will be provided to all offerors who received the original Request for Request for
PROPOSALS. The County shall not be legally bound by an amendment or interpretation that is
not in writing.
5.0 ADDITIONAL INFORMATION: Offerors requiring additional information may submit
their questions, in writing to the Procurement Services Department. Answers to questions received
that should change and/or clarify this solicitation will be provided in writing to all offerors via an
amendment.
6.0 ORAL PRESENTATION/DISCUSSIONS: Any offeror or all offerors may be requested
to make an oral presentation of their Request for PROPOSALS to the County, after the Request
for PROPOSALS opening. Discussions may be conducted with responsible offerors, who submit
Request for PROPOSALS determined to be reasonably susceptible of being selected for award for
the purpose of clarification to assure full understanding of and responsiveness to the solicitation
requirement.
Offerors shall be accorded fair and equal treatment with respect to any opportunity for discussions
and revision of Request for PROPOSALS, and such revisions may be permitted after submissions
and prior to award, for the purpose of obtaining best and final offers. The purpose of these
presentations/discussions will be to:
A. Determine in greater detail such offeror’s PROPOSALS.
B. Explore with the offeror the scope and nature of the project, the offeror’s proposed
method of performance, and the relative utility of alternative methods of approach.
C. Determine that the offeror will make available the necessary personnel and facilities to
perform within the required time.
D. Agree upon fair and reasonable compensation, taking into account the estimated value of
the required services/equipment, the scope and complexity of proposed project, and
nature of such services/equipment.
7.0 FUNDING: The offeror shall agree that fu nds expended for the purposes of the contact
must be appropriated by the County Council for each fiscal year included within the contract
period. Therefore, the contract shall automatically terminate without penalty or termination costs
if such funds are not appropriated. In the event that funds are not appropriated for the contract,
the offeror shall not prohibit or otherwise limit the County’s right to pursue and contract for
alternate solutions and remedies, as deemed necessary by the County for the co nduct of its
affairs. The requirements stated in this paragraph shall apply to any amendment or the execution
of any option to extend the contract.
8.0 AWARD: An award resulting from this request shall be awarded to the responsive and
responsible offeror whose Request for PROPOSALS is determined to be most advantageous to the
County, taking into consideration price and the evaluation factors set forth herein; however, the
right is reserved to reject any and all Request for PROPOSALS received, and in all cases the
Page 40 of 329
RFQ #042925 DOCUMENTS Page 22
County will be the sole judge as to whether an offeror’s Request for PROPOSALS has or has not
satisfactorily met the requirements of this RFP.
9.0 PUBLIC ACCESS TO PROCUREMENT INFORMATION: No such documents or other
documents relating to this procurement will be presented or made otherwise available to any other
person, agency, or organization until after award. Commercial or financial information obtained
in response to this RFP, which is privileged and confidential, will not be disclo sed. Such
privileged and confidential information includes information which, if disclosed, might cause harm
to the competitive position of the offeror supplying the information. All offerors, therefore, must
visibly mark as “Confidential” each part of t heir Request for PROPOSALS, which they
consider containing proprietary information.
10.0 DEVIATIONS: Any deviations from the requirements of this RFP must be listed separately
and identified as such in the table of contents.
11.0 ALTERNATES: Innovative alternative Request for PROPOSALS is encouraged, provided
however, that they are clearly identified as such and all deviations from the primary Request for
PROPOSALS are listed.
12.0 GRATUITIES: It shall be unethical for any pers on to offer, or give, or agree to give any
County employee or former County employee; or for any County employee or former County
employee to solicit, demand, accept, or agree to accept from another person a gratuity or an offer
of employment in connection with any decision, approval, disapproval, recommendation, or
preparation of any part of a program requirement or a purchase request, influencing the content of
any specification or procurement standard, rendering of advice, investigation, auditing, or in any
other advisory capacity in any proceeding or application, request for ruling, determination, claim
or controversy, or other particular matter pertaining to any program requirement, or a contract or
subcontract, or to any solicitation or Request for PROPOSALS therefore.
13.0 KICKBACKS: It shall be unethical for any payment, gratuity, or offer of employment to
be made by or on behalf of a subcontractor under a contract to the prime contractor or higher tier
subcontractor, or any person associated ther ewith, as an inducement for the award of a
subcontractor order.
14.0 PROTEST PROCEDURES
14.1 Right to Protest : Any actual or prospective bidder, offeror, or contractor, who is
aggrieved, in connection with the solicitation or award of a contract, may protest to the
Procurement Services Director. The protest shall be submitted in writing fourteen (14) days
after such aggrieved person knows or should have known of the facts giving rise
thereto. The protest must be accompanied by a detailed statemen t, indicating the reasons
for such protest.
14.2 Authority to Resolve Protest : The Procurement Services Director shall have
authority, prior to the commencement of an action in court concerning the controversy, to
settle and resolve a protest of an ag grieved bidder, offeror, or contractor; actual or
prospective, concerning the solicitation or award of a contract.
Page 41 of 329
RFQ #042925 DOCUMENTS Page 23
14.3 Decision: If the protest is not resolved by mutual agreement, the Procurement
Services Director shall issue a decision, in writing within ten (10) days. The decision shall,
State the reasons for the action taken; and
Inform the protestant of its right to administrative review as provided in this Section.
14.4 Notice of Decision: A decision under Subsection (3) of this Section shall be mailed
or otherwise furnished immediately to the protestant and any other party intervening.
14.5 Finality of Decision: A decision under Subsection (3) of this Section shall be final
and conclusive, unless fraudulent, or
1. Any person adversely affected by the decision appeals administratively, within ten
(10) days after receipt of decision under Subsection (3) to the County Council in
accordance with this Section.
2. Any protest taken to the County Council or court shall be subject to the protestant
paying all administrative costs, attorney fees, and court costs when it is determined
that the protest is without standing.
Attachments:
A - Bermuda Bluff
Page 42 of 329
ALICE G. HOWARD
CHAIRMAN
ANNA MARIA TABERNIK
VICE CHAIRMAN
COUNCIL MEMBERS
GERALD DAWSON
DAVID BARTHOLOMEW
YORK GLOVER, SR.
JOSEPH F. PASSIMENT, JR.
LARRY McELYNN
LOGAN CUNNINGHAM
PAULA BROWN
MARK LAWSON
THOMAS REITZ
COUNTY COUNCIL OF BEAUFORT COUNTY
ADMINISTRATION BUILDING
BEAUFORT COUNTY GOVERNMENT ROBERT SMALLS COMPLEX
100 RIBAUT ROAD
POST OFFICE DRAWER 1228
BEAUFORT, SOUTH CAROLINA 29901-1228
TELEPHONE: (843) 255-2180
www.beaufortcountysc.gov
March 18, 2025
MICHAEL MOORE
COUNTY ADMINISTRATOR
SARAH W. BROCK
CLERK TO COUNCIL
Stefanie Nagid
Beaufort County Passive Parks
Dear Ms. Nagid,
Congratulations! On behalf of the Beaufort County Council, I would like to thank you for participating in the
Local Accommodations (ATAX) and Local Hospitality (HTAX) Tax grant funding cycle for internal Beaufort
County projects. Finance is pleased to inform you that your project, Bermuda Bluff Passive Park, has been
awarded $650,000. These funds may only be used for the purposes outlined in your project. Please use the
following general ledger coding for your project expenses: 2002-10-0000-54500-PPARK.
As a reminder, the South Carolina Freedom of Information Act defines a "public body" as any
organization or corporation supported in whole or in part by public funds or expending public funds. Your
organization's acceptance of public funds from Beaufort County may cause your organization to come
within the meaning of a "public body" as defined by the Freedom of Information Act, S. C. Code Ann.
§30-4-10, et. Seq. (Supp. 2002). Accordingly, this is to advise that by accepting the public funds, your
organization may be subject to the South Carolina Freedom of Information Act. If your organization has
any questions or concerns, we suggest you seek legal advice prior to accepting the above stated tax funds.
Additionally, as a condition of your award, your department will be required to document the expenditure of
these funds to the Finance Department by submitting quarterly reports. These reports should detail the
financial and physical progress of the project, as well as the impact of these expenditures on tourism in
Beaufort County. A progress report template will be provided. Reports are due by the 10th of the month
following the end of each quarter (i.e., July 10th, October 10th, January 10th, and April 10th). Failure to
submit progress reports may result in disqualification from future awards. Once the project is complete, a final
report will be required. Relevant documentation can be emailed to Brycen.Campbell@bcgov.net. If you have
any questions or need assistance while preparing your documentation, you may email Ms. Campbell or contact
her by phone at (843) 255-2316.
Awardees have two (2) years from the date of this letter to fully expend their grant funds. Beaufort
County Council appreciates your department's efforts to promote tourism in Beaufort County. Best
wishes with your projects.
Sincerely,
Pinky Harriott
Chief Financial Officer
Beaufort County Finance
Page 43 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION TO APPROVE TALBERT, BRIGHT, AND ELLINGTON (TBE) WORK AUTHORIZATION (WA)
2119-2501 FOR BEAUFORT EXECUTIVE AIRPORT (ARW) PARTIAL PARALLEL TAXIWAY (DESIGN & BIDDING)
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of TBE WA 2119-2501 for ARW Partial Parallel Taxiway (Design and Bidding).
Committee Options: Motion to approve/deny TBE WA 2119-2501 for ARW Partial Parallel Taxiway (Design and
Bidding).
Council Options: Motion to approve/deny TBE WA 2119-2501 for ARW Partial Parallel Taxiway (Design and
Bidding).
Next step: County Council Meeting - September 8, 2025
PRESENTER INFORMATION:
Jon Rembold, Airports Director, 3 minutes
ITEM BACKGROUND:
The existing taxiway infrastructure at ARW includes three connector taxiways to Runway 07/25, with a partial
parallel taxiway extending from the Runway 07 threshold to Taxiway A. The proposed safety project will
extend this parallel taxiway eastward from the existing crossfield taxiway, terminating approximately 639 feet
from the end of Runway 25. This strategic termination point is designed to avoid significant impacts to the
adjacent saltwater marsh, ensuring compliance with environmental regulations and reducing permitting
complexities. The scope of work includes comprehensive design and bidding services, encompassing
earthwork, storm drainage, pavement construction, lighting, signage, and stormwater management systems
that meet Federal, state, and local requirements. This project aims to enhance safety, operational efficiency,
and infrastructure resilience at the airport while minimizing environmental impacts. The resulting safety
improvement is a significant reduction in the risk associated with aircraft back-taxiing on the runway for
departure.
FISCAL IMPACT:
The total value of this Work Authorization shall not exceed $252,074.31.
The project funding is allocated as follows:
FAA Grant (Federal 95%) $244,220.00
SCAC Grant (State 2.5%) $6,427.00
ARW (Local 2.5%) $6,428.31
GL Code 5102-90-0000-57130 | Current Encumbered Balance: $4,385,452.00
Page 44 of 329
APPROVAL HISTORY:
The Airports Board reviewed and recommended approval of the work authorization at its monthly meeting
held on July 17, 2025.
Page 45 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
1
BEAUFORT EXECUTIVE AIRPORT
BEAUFORT, SOUTH CAROLINA
WORK AUTHORIZATION 25-01
April 7, 2025
PROJECT NO.: TBE NO. 2119-2501
It is agreed to undertake the following work in accordance with the provisions of our Contract
for Professional Services.
Description of Work: The Beaufort Executive Airport currently only has three (3) connector
taxiways to the runway. There are two (2) taxiways from the aircraft parking ramp that each lead
to Runway 07/25. There is also a portion of a parallel taxiway to Runway 07-25, that extends from
the Runway 07 threshold and continues to Taxiway A (see exhibit for layout of existing and
proposed partial parallel taxiway) . The scope of this project is to extend the parallel taxiway to
the east of the existing crossfield taxiway and then intersect the runway east of the Aiming Point
markings. This proposed partial parallel taxiway will not extend fully to Runway 25 due to the
environmental impacts of the saltwater marsh.
The proposed work includes erosion control, earthwork, storm drainage, new bituminous
pavement, edge lighting and guidance signs, related electrical work, and pavement markings. The
stormwater design will include all measures for flood prevention and water quality treatment to
meet the current City of Beaufort and SCDES-BCM stormwater requirements.
The proposed professional services included for this project are the design and bidding phase
services in a lump sum format . Additional services include a topographic survey and pre -design
geotechnical investigation services.
Design standards to be used in the project include, but are not limited to, the Federal Aviation
Administration’s Advisory Circulars:
150/5300-13B Airport Design
150/5320-6G Airport Pavement Design and Evaluation
150/5340-1M Standards for Airport Marking
150/5340-30J Design and Installation Details for Airport Visual Aids
150/5370-2G Operational Safety On Airports During Construction
150/5370-10H Standards for Specifying Construction of Airports
TBE will assist with/prepare FAA grant fund ing requests and quarterly status reports for
execution by the Airport staff. TBE will also assist with/prepare grant closeout documentation
required by the FAA for this project.
Page 46 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
2
Professional services to be provided by Talbert, Bright & Ellington, LLC (TBE) will include civil and
survey services, and a geotechnical investigation required to accomplish the following items:
PHASE 01 – Project Formulation/Development
The preliminary design phase is intended to identify and evaluate alternatives to assure cost
effective and practical solutions for the work items identified. TBE will complete its evaluation of
alternatives through contacts with local authorities, field investigations, and a practical design
approach. The design will take advantage of local knowledge and experience and utilize expertise
from recent construction projects to design a cost- effective project and ensure competitive
construction bids. B ids will adhere to the purchasing and procurement policies set forth by
Beaufort County, as well as local and state laws. Activities include:
a. Conduct a project kick-off meeting. Attendees will be Beaufort County, FAA, design team,
and airport tenants.
b. Coordinate with the following agencies for necessary permits related to the proposed
improvements for this project:
a. South Carolina Department of Environmental Services (SCDES)
b. South Carolina Bureau of Coastal Management (BCM) – Coastal Zone Consistency
(CZC) Certification
c. City of Beaufort Site Development (Site contractor submittal by others)
d. FAA
c. Prepare a preliminary estimate of probable construction costs and schematic design for
each element of the project.
PHASE 04 – Preliminary Design
a. Layout and design of new partial parallel taxiway.
b. Design of erosion and sediment control devices.
c. Continue coordination with permitting agencies to determine need for stormwater BMP
measures.
d. Complete necessary site surveying , including both topographic and planimetric survey .
This will also include location of all existing drainage pipes, ditches and other stormwater
Page 47 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
3
measures. Survey does not include private underground utility location, and is not
required to be in accordance with FAA AC 150/5300-18B and related advisory circulars.
e. Provide recommendations for construction phasing to the sponsor and airline tenants for
their review.
f. Meet with Sponsor/ FAA to review project at 60 percent and 90 percent completion ( 2
meetings).
g. Complete estimates of probable construction costs for each review submittal and for any
recommended alternatives.
h. Solicit comments on preliminary design from airport personnel and FAA.
PHASE 04 – Final Design
a. Incorporate preliminary design comments and respond as necessary to requests for
additional information.
b. Provide final design drawings, specifications, and final estimate of probable construction
costs and schedule for the project.
c. Develop specifications using FAA AC 150/5370-10, "Standards for Specifying Construction
of Airports," as amended, and utilize standard provisions supplied by the sponsor, as
necessary.
d. Development of construction safety and phasing plan in accordance with FAA AC
150/5370-2, "Operational Safety on Airports during Construction."
e. Design all improvements in accordance with FAA standards and guidelines.
f. Provide for all required design of utilities and services within the area defined in the
preliminary design.
g. Complete final quantity calculations.
h. Complete final engineer's report for the project. This report will detail all data utilized in
the design of the project. The final design report will discuss any/all assumptions made
during the design. This shall include the following: Stormwater system survey, final plans,
estimates of probable construction costs, and phasing/scheduling recommendations.
Page 48 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
4
i. Solicit sponsor and FAA approval.
j. Complete and submit 7460 applications through FAA OEAAA website.
k. Submit project to the following local and state permitting agencies:
i. South Carolina Department of Environmental Services (SCDES)
ii. South Carolina Bureau of Coastal Management (BCM) – Coastal Zone Consistency
(CZC) Certification
iii. City of Beaufort Site Development (Site contractor submittal by others)
l. Assist airport with advertising and interpretation of project requirements.
m. Assist airport with preparation of the project application to FAA.
n. Deliverables - Engineer will provide interim design submittals at 60 percent, 90 percent
and 100 percent design completion phases. Deliverables for the 60 percent and 90
percent phases will consist of plan sheets, technical specifications, and itemized
construction cost estimate : PDF format. Deliverables for the 100 percent phase will
consist of plan sheets, technical specifications, itemized construction cost estimat e, and
final Engineer’s Report.
PHASE 05 – Bidding
a. Coordinate schedule and advertisement with Sponsor and FAA.
b. Distribute plans/specifications to bidders, plan rooms, and funding agencies.
c. Conduct the virtual pre-bid meeting.
d. Respond to contractor Requests for Information.
e. Prepare addenda based off pre-bid meeting and bidders’ questions.
f. Beaufort County will conduct the online bid opening per the County’s standard practices.
g. Prepare and distribute the bid tabulation.
h. Review bids. Coordinate with FAA Civil Rights on DBE participation.
Page 49 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
5
i. Send recommendation of contract award to Sponsor.
j. Assist Sponsor with grant application.
k. Deliverables - Engineer will provide bid tabulation of bids received, and submittal of DBE
participation proposed by low responsive bidder to FAA Civil Rights for review and
concurrence by the FAA. Upon receipt of written approval of DBE Participation Letter
from FAA Civil Rights, Engineer will provide written summary of bids received and
construction contract award recommendation for consideration by the Owner.
SPECIAL SERVICES
Task 1 – Pre-Design Geotechnical Investigation
A pre-design geotechnical investigation will be performed by Terracon Consultants, Inc. for this
project. See Appendix C for detailed scope of services for this work.
Task 2 – Ground Survey
A topographic and planimetric survey will be conducted by WithersRavenel, Inc. for this project.
See Appendix C for detailed scope of services for this work.
Task 3 – Stormwater Design and Permitting
Erosion control and stormwater management plans will be designed by Ward Edwards
Engineering for this project. Ward Edwards Engineering will also be responsible for all project
permitting for this project. See Appendix C for detailed scope of services for this work.
Estimated Time Schedule: Work shall be completed in accordance with the schedule established
and agreed upon by the Owner and Engineer.
Cost of Services: The method of payment shall be in accordance with Article 6 – Compensation
of the contract. The work shall be performed in accordance with the Master Contract as a lump
sum of $128,839.31, which includes reimbursable expenses. Special services shall be performed
on a not to exceed basis with a budget of $123,235.00. For a total of $252,074.31.
Page 50 of 329
Page 51 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
7
APPENDIX A – SCHEMATIC
Page 52 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
8
APPENDIX B – FEE PROPOSAL
Page 53 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
9
Page 54 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
10
Page 55 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
11
Page 56 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
12
Page 57 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
13
Page 58 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
14
Page 59 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
15
Page 60 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
16
APPENDIX C – SPECIAL SERVICES PROPOSALS
Page 61 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
17
Page 62 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
18
Page 63 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
19
Page 64 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
20
Page 65 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
21
Page 66 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
22
Page 67 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
23
Page 68 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
24
Page 69 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
25
Page 70 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
26
Page 71 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
27
Page 72 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
28
Page 73 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
29
Page 74 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
30
Page 75 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
31
Page 76 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
32
Page 77 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
33
Page 78 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
34
Page 79 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
35
Page 80 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
36
Page 81 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
37
Page 82 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
38
Page 83 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
39
Page 84 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
40
Page 85 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
41
Page 86 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
42
Page 87 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
43
Page 88 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
44
Page 89 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
45
Page 90 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
46
Page 91 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
47
Page 92 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
48
Page 93 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2501
49
Page 94 of 329
Page 95 of 329
Page 96 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION TO APPROVE A WORK AUTHORIZATION TO TALBERT, BRIGHT, AND ELLINGTON FOR
CONSTRUCTION ADMINISTRATION AT THE HILTON HEAD ISLAND AIRPORT FOR THE AIRFIELD DRAINAGE
IMPROVEMENTS $240,923.36.
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of a Work Authorization to Talbert, Bright, and Ellington for construction
administration at the Hilton Head Island Airport for the Airfield Drainage Improvements $240,923.36.
PRESENTER INFORMATION:
Jon Rembold, Airports Director, 3 minutes
ITEM BACKGROUND:
HXD is undertaking a project to strengthen stormwater drainage inlet structures within the Runway 03/21
safety area. This work is necessary due to the airport’s upgrade from reference code C-II to C-III, which
expanded the runway safety area from 400 to 500 feet and brought several drainage structures into critical
load-bearing zones. The retrofit will reinforce these inlets to safely handle aircraft loads, involving the
replacement of grates, top concrete slabs, and the addition of reinforced concrete aprons. TBE will manage
construction administration, quality assurance testing, and provide a full-time resident project representative
to oversee the work. All construction will comply with FAA safety standards and advisory circulars. The total
project budget is $240,923.36, including construction administration, mandatory construction oversight, and
special services. TBE (WA #2119-2407) will also assist with FAA grant administration, progress reports, and
final project closeout documentation. This contract award is part of the overall project that includes the
construction and the construction administration.
FISCAL IMPACT:
The total value of this Work Authorization shall not exceed $240,923.36.
The project funding is allocated as follows:
FAA Grant (Federal 95%) $1,493,515.00
SCAC Grant (State 5%) $78,606.71
GL Code 5402-90-0000-57130 | Current Encumbered Balance: $37,823,683.00.
APPROVAL HISTORY:
The Airports Board reviewed and recommended approval of the work authorization at its monthly meeting
held on July 17, 2025.
Page 97 of 329
Page 98 of 329
Page 99 of 329
Page 100 of 329
Page 101 of 329
Page 102 of 329
Page 103 of 329
Page 104 of 329
Page 105 of 329
Page 106 of 329
Page 107 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION TO APPROVE A WORK AUTHORIZATION FOR TALBERT, BRIGHT, AND ELLINGTON TO
PREPARE THE ENVIRONMENTAL ASSESSMENT FOR TAXIWAY "F" RUNWAY OBJECT FREE AREA PROJECT AT THE
HILTON HEAD ISLAND AIRPORT $322,129.21
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of a Work Authorization for Talbert, Bright, and Ellington to prepare the
Environmental Assessment for Taxiway "F" project at the Hilton Head Island Airport $322,129.21
PRESENTER INFORMATION:
Jon Rembold, Airports Director, 3 minutes
ITEM BACKGROUND:
This item authorizes the preparation of environmental documentation for the relocation of HXD Taxiway F.
The current 300-foot separation between the runway and Taxiway F does not meet updated FAA standards,
which now require a 400-foot separation due to the use of larger regional jets. To comply, the airport must
acquire and clear 12 adjacent commercial properties. TBE will prepare the required Environmental Assessment
(EA), addressing potential impacts to air quality, wetlands, noise, historic resources, and other environmental
factors in accordance with FAA and NEPA requirements. (WA) 2119-2404
FISCAL IMPACT:
This project is 100% funded by federal and state grants. The total estimated cost of the project is $322,129.21,
with funding allocated as follows:
Federal Aviation Administration (FAA):
Federal (95%): $306,023.00
South Carolina Aeronautics Commission (SCAC):
State Share (5%): $16,106.21
GL Code 5402-90-0000-57130 | Current Encumbered Balance: $37,823,683.00
APPROVAL HISTORY:
The Airports Board reviewed and recommended approval of the work authorization at its monthly meeting
held on July 17, 2025.
Page 108 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
1
HILTON HEAD ISLAND AIRPORT
HILTON HEAD ISLAND, SOUTH CAROLINA
WORK AUTHORIZATION 234-04
June 4, 2025
PROJECT NO.: TBE NO. 2119-2404
It is agreed to undertake the following work in accordance with the provisions of our
Contract for Professional Services.
Description of Work Authorized: Taxiway “F” (located on the west side of Runway 03/21)
at the Hilton Head Island Airport (HXD) currently has a runway -to-taxiway separation of
300 feet. In 2011, the Airport Layout Plan (ALP) was approved by the FAA with a Runway
Design Code (RDC) of C -II based on an aircraft family grouping (>12,500 pounds but
<60,000 pounds [DHC-8-100 and Learjet 40/45]). With the extension of Runway 03/21 to
5,000 feet in 2018, American Airlines (AA) launched the commercial service jet era at HXD.
AA retired their Dash -8-200 and Dash 8- 300 turboprop aircraft and replaced them with
Embraer E-175 regional jet aircraft for year-round service at HXD. Shortly after American
Airlines began its new jet service, United Airlines (UA) announced seasonal service
starting Spring 2019 with E-175 aircraft, as well. Subsequently, in 2019, Delta Airlines (DL)
returned after leaving in 2011 and started year-round service to HXD with E-170 aircraft.
With the introduction of the commercial service jets, which have an RDC of C -III, the
design standards at HXD in accordance with AC 150/5300-13B – Airport Design, require a
runway/taxiway separation of 400 feet.
The change of RDC from C-II to C-III requires a runway/taxiway separation of 400 feet. To
bring Taxiway “F” into compliance with FAA design standards, HXD would have to
purchase 12 properties adjacent to the airport property line listed in the table below and
identified on page 18. E xisting businesses will be relocated in accordance with FAA
Advisory Circular (AC) 150/5100-17 Land Acquisition and Relocation Assistance for Airport
Improvement Program Assisted Projects.
1 On ce the parcels are purchased, existing
structures and vegetation would be demolished to provide a clear runway object free
area.
1Federal Aviation Administration, “Advisory Circular 150/5100-17 – Land Acquisition and Relocation
Assistance for Airport Improvement Program (AIP) Assisted Projects , Change 7, July 10, 2017,
<http://www.faa.gov/>, accessed June 4, 2025.
Page 109 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
2
Land Acquisition Properties Required for the Relocation of Taxiway F
Graphic
ID # Parcel # Property Owner Acreage Use
1
R511 008 000 0105 0000 PS Southeast Two LLC
5.58
Commercial Improved
Miscellaneous
Warehouse and Storage
Billing Address: 701 Western Avenue
Glendale, CA 91201
Location: 55 Mathews Drive
2
R510 008 000 0185 0000 Elite Resort Group, Inc.
0 Commercial Improved
Trade Other
Billing Address: P.O. Box 5370
Hilton Head Island, SC 29938
Location: 10 Hunter Road
3
R510 008 000 0300 0000 Mathesoya Management Corp
1.29 Commercial Improved
Service Professional
Billing Address: P.O. Box 6838
Hilton Head Island, SC 29938
Location: 18 Hunter Road
4
R510 008 000 0301 0000 Corley Road LLC
1.25 Commercial Improved
Service Professional
Billing Address: 5275 Chelsen Wood Drive
Johns Creek, GA 30097
Location: 20 Hunter Road - has avigation easement
5
R510 008 000 0302 0000 Socol Company Inc. LLC
3.79 Commercial Improved
Service Professional
Billing Address: 55 Glenlake Parkway
Atlanta, GA 30328
Location: 24 Hunter Road
6
R510 004 000 0338 0000 Runway Enterprises of HHI LLC
1
Commercial Improved
Miscellaneous
Warehouse and Storage
Billing Address: 5 Rampart Lane
Hilton Head Island, SC 29928
Location: 6 Blue Jay Way
7
R510 004 000 0339 0000 Stonehenge Corp.
1 Commercial Improved
Trade Other
Billing Address: P.O. Box 770
Bowling Green, KY 42102
Location: 3 Blue Jay Way
8
R510 004 000 0340 0000 Gary M. Brown
1.22
Commercial Improved
Miscellaneous
Warehouse and Storage
Billing Address: 7757 Preservation Road
Tallahassee, FL 32312
Location: 10 Finch Street
9
R510 004 000 0341 0000 Coligny Plaza Ltd
1.53 Commercial Improved
Trade Other
Billing Address: P.O. Box 6133
Hilton Head Island, SC 29938
Location: 12 Finch Street
10
R510 004 000 0342 0000 Finch Street Investors LLC
1.12 Commercial Improved
Trade Wholesale
Billing Address: 16 Finch Street
Hilton Head Island, SC 29926
Location: 16 Finch Street
11 R510 004 000 0345 0000 F.A. Imperial LLC 2.38 Commercial Improved
Trade Other Billing Address: 1665 North Walter Street
Page 110 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
3
Land Acquisition Properties Required for the Relocation of Taxiway F
Graphic
ID # Parcel # Property Owner Acreage Use
Milwaukee, WI 53202
Location: 144 Beach City Road
12
R510 004 000 0343 0000 R. Ling Graves, Jr.
1.38 Commercial Improved
Trade Other
Billing Address: 3 Estill Beach Lane
Bluffton, SC 29910
Location: 148 Beach City Road
In addition, in accordance with FAA AC 150/5300-13B Change 1 (with errata changes as
of April 3, 2025) the following design requirements need to be met:
• Runway Object Free Area (ROFA)
Provide area clear of above-ground objects protruding above the elevation of
the nearest point of the RSA:
• Ensure terrain is no higher than the nearest point of the RSA within a
distance from the edge of the RSA equal to half the most demanding
wingspan of the RDC.
• Keep area clear of parked aircraft and vehicles, and any non -navigational
objects not allowed in paragraph 3.12.1, item 4.
Recommended Practices:
• To the extent practical, make objects in the ROFA that exceed the elevation
of the nearest point on the RSA comply with the same frangibility criteria
as the RSA.
• Preclude locating objects in a ROFA that can function equally outside of
the ROFA.
• Runway Safety Area (RSA)
The RSA enhances the safety of aircraft that undershoot, overrun, or veer off
the runway, and provides greater accessibility for ARFF equipment during such
incidents.
Grading:
• Provide an RSA that is:
Cleared and graded with no potentially hazardous ruts, humps,
depressions, or other surface variations.
Drained by grading or storm sewers to prevent water accumulation.
Capable, under dry conditions, of supporting snow removal
equipment, ARFF equipment, and the occasional passage of aircraft
without causing major damage to the aircraft.
Graded to the longitudinal and transverse grades in paragraph 3.16.5.
Object Clearing:
Page 111 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
4
• Provide an RSA free of objects excluding those objects that need to reside
in the RSA because of function (e.g., fixed-by-function).
Configure airfield geometries to keep the RSA clear during an aircraft
operation of:
• All portions of a holding or taxiing aircraft.
• All portions of a holding or moving ground vehicle.
Design objects in the RSA with a height greater than 3 inches (76 mm)
above the surrounding grade to have a frangible point no higher than
3 inches (76 mm) above the surrounding grade. See AC 150/5220-23.
Design foundations, concrete pads, and handholes that need to reside
in the RSA:
• To be capable of supporting snow removal equipment (SRE)
vehicles, ARFF vehicles, and occasional passage of the most
demanding aircraft.
• Such that the top elevation is within a range between flush with
grade and a height of 1-inch (25 mm) above immediate surrounding
grade.
Locate objects outside the RSA if it is not essential for the object to
reside within the RSA.
Projects associated with ROFA and RSA clearing/grading will aid in future development of
the Taxiway F relocation to meet runway -taxiway separation requirements. It is
imperative for the airport to begin work in land/easement acquisition, clearing and
grading related to the ROFA, which will play an integral part in review and approval of any
modifications of standards associated with the near -term Runway 0 3/21 pavement
rehabilitation.
This work authorization presents Talbert, Bright & Ellington, LLC’s (TBE) scope of services
relating to the preparation of an environmental assessment (EA) for the previously
described project.
In fulfilling this scope of work, numerous objectives will be achieved including
environmental inventory, evaluation, and analysis; state, federal, and local agency
coordination; draft and final environmental documentation; and a public workshop. The
environmental documentation will be prepared in accordance with the National
Environmental Policy Act of 1969 (NEPA), FAA Order 5050.4B, National Environmental
Policy Act (NEPA) Implementing Instructions for Airport Projects (April 28, 2006), FAA
Order 1050.1F – Environmental Impacts: Policies and Procedures (July 16, 2015), and
1050.1F Desk Reference (July 2015). The Federal Aviation Administration (FAA) has agreed
to review and approve the documentation.
Page 112 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
5
It is the intent of this environmental documentation process to review no more than one
build alternative, in addition to the no build alternative because of the requirements to
meet FAA design standards in accordance with AC 150/5300- 13B – Airport Design .
Determination of potential impacts to water quality, the unknown extent of wetlands or
jurisdictional waters of the United States, and impact on adjacent residential
development from noise, are issues that will be addressed during the preparation of this
EA.
The following tasks are required to achieve the aforementioned output.
TASK 1: PROJECT MANAGEMENT
Project goals and objectives will be determined through coordination and consultation
with the COUNTY, in order to create a chart of activities and a milestone schedule. These
two items will provide the COUNTY and TBE with a sequential scheme of events and the
anticipated dates to achieve the project goals.
ASSUMPTIONS:
1. For budgeting purposes, it was assumed that the project should take six (6) months to
perform the necessary field work , not including review by resource and regulatory
agencies.
2. If additional field work is required by the resource agencies (for example, a Phase II
Cultural Resources Survey), the schedule below will be modified under a contract
amendment.
3. Monthly virtual coordination meetings will be held with TBE, COUNTY, FAA, and South
Carolina Aeronautics Commission (SCAC).
Work Item Time (Days) Cumulative Time (Days)
Notice to Proceed 0 0
Scoping Meeting 1 1
Field Work 45 46
Document Preparation/In-house
Review
60 101
FAA/Client Review TBD TBD
Draft Document Finalization 30 131
Page 113 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
6
DELIVERABLES:
1. A flow chart of activities and milestone schedule.
2. Attendance at three (3) meetings, not including the public information meeting.
A. PUBLIC INFORMATION MEETING – A public information meeting will be scheduled
at the beginning of the project to inform the public of the purpose of the project.
The meeting will utilize an informal/open house format for a period of two hours
to maximize the opportunity for interested citizens to participate. The meeting
will be publicized via the Hilton Head Airport web site and media. TBE will provide
handouts, display boards, sign -in sheets, and comment forms, as well as a
recorder for oral comments.
ASSUMPTIONS:
1. One (1) public information meeting will be conducted.
2. Four (4) TBE team members will attend the meeting.
3. Beaufort County will handle meeting logistics (location, advertising for meetings, etc.).
4. FAA will review and approve the materials to be used at the public information
meeting.
DELIVERABLES:
1. Handouts (200), displays (maximum of four), sign-in sheets, comment forms (200).
2. A summary of each meeting, copy of comments received, and transcript of recorded
comments.
TASK 2: STATE, FEDERAL, AND LOCAL AGENCY COORDINATION
Coordination will include ongoing public relation activities to ensure that the agencies are
kept informed of the project’s progress. Activities to be conducted for this task are as
follows:
A. Continuing research and communication with state, federal, and local
environmental agencies.
B. Preparation of a scoping letter for federal, state, and local agencies advising of the
COUNTY’s intent to proceed with the preparation of an environmental
assessment.
ASSUMPTIONS:
1. TBE will provide drafts of correspondence letters with SHPO and tribes for issuance by
the FAA.
Page 114 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
7
2. FAA will review and approve the scoping letter prior to issuance to state, federal, and
local environmental agencies
3. A scoping meeting with state, federal, and local agencies will not be held.
4. TBE will maintain the written communication records and records of verbal
communications/meetings.
DELIVERABLE:
1. TBE will prepare the scoping letter.
TASK 3: ENVIRONMENTAL INVENTORY, EVALUATION, AND ANALYSIS
The environmental inventory, evaluation, and analysis will be conducted in accordance
with the requirements of the National Environmental Policy Act of 1969 (NEPA), FAA
Order 5050.4B, National Environmental Policy Act (NEPA) Implementing Instructions for
Airport Projects (April 28, 2006), FAA Order 1050.1F – Environmental Impacts: Policies and
Procedures (July 16, 2015), and 1050.1F Desk Reference (July 2015).
Prior to initiation of the environmental analysis, TBE will notify the COUNTY and FAA of
agency concerns resulting from the project agency early coordination process. The
required level of detail for each environmental issue will also be discussed. Existing data
will be collected from the appropriate agencies; and, through field and map examination,
data will be analyzed, and used to determine the potential impacts of the proposed
project. Mitigation measures, including avoidance and minimization options, will be
investigated for impacts (unless herein noted otherwise).
A. AIR QUALITY – Coordination with the South Carolina Department of Health and
Environmental Control Division of Air Quality (SCDHEC -DAQ) to determine
whether an air quality analysis and/or air quality permit shall be required, as well
as a request for air quality conformity. Using the Aviation Emissions and Air Quality
Handbook and required FAA Aviation Environmental Design Tool (AEDT) 2c,
potential air quality impacts due to construction will be analyzed to determine
general conformity with de minimis emission levels.
ASSUMPTIONS:
1. Beaufort County is considered an attainment area for National Ambient Air Quality
Standards (NAAQS) pollutants.
2. FAA Emissions and Dispersion Modeling System (EDMS) input and emission levels for
the proposed project will not be prepared.
3. FAA Aviation Environmental Design Tool (AEDT) 2c will be used to determine potential
construction impacts to air quality.
Page 115 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
8
4. No monitoring of existing air quality or modeling will be performed as part of this
scope of services.
B. BIOLOGICAL RESOURCES –
1. Biotic Communities – A survey of biotic communities that may be affected
directly or indirectly by the proposed project will be performed. This survey
will be performed in conjunction with Task B.2 – Endangered and Threatened
Species of Flora and Fauna. A brief description of the biotic communities will
be prepared for inclusion in the environmental document.
2. Endangered and Threatened Species of Flora and Fauna – Reference
information on threatened, endangered, and other rare species and critical
habitats, as listed by the U.S. Fish and Wildlife Service (USFWS) and National
Marine Fisheries Service (NMFS), will be reviewed. Utilizing the reference
information collected, field investigations will be conducted to identify habitat
that may support the listed species. The location of previously sighted species,
critical habitat, and habitat suitable for the legal ly protected species will be
identified on an overlay map. Section 7 (Endangered Species Act) Biological
Assessment will be prepared and forwarded to USFWS and NMFS in
conjunction with the draft environmental document regardless of species
present. Final agency concurrence with the results of the biological
assessment and required mitigation measures will be summarized in the final
environmental document, as required.
ASSUMPTION:
1. The site will be visited twice by an experienced biologist, for plant flowering periods.
2. The results of the biological assessment will be submitted to the USFWS and SCDNR
for concurrence.
3. Courtesy copies of the biological assessment will be provided to the COUNTY, FAA, and
SCAC.
4. Should it be determined by USFWS or SCDNR that additional site visits will be
necessary; these will be performed under a contract amendment.
C. COASTAL RESOURCES –
1. Coastal Zone Management Program – Because the study area is located in the
South Carolina Coastal Zone, coordination will be conducted with the SCDHEC
Office of Coastal Resource Management (OCRM) to ensure consistency with
the South Carolina Coastal Management Program . In particular, potential
direct or indirect impacts to the designated critical areas will be identified.
Page 116 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
9
Mitigation measures will be investigated and summarized as necessary. During
the preparation of the final environmental document, a final mitigation plan
will be prepared, if deemed necessary.
2. Coastal Barriers – Coastal barriers protected under the Coastal Barrier
Resource Act will be identified. In addition, early coordination will be
conducted with the review agencies to identify potential impacts and
mitigative measures, if necessary.
D. DEPARTMENT OF TRANSPORTATION ACT, SECTION 4(f) – An early inventory will
be conducted to determine the presence of Section 4(f) properties (i.e., parks,
recreation areas, wildlife and waterfowl refuges, and/or historic and
archaeological sites).
E. FARMLAND – Soil data (prime, unique, and statewide important) will be evaluated.
Information will be submitted on Form AD -1006, Farmland Conversion Impact
Rating, Land Evaluation – Site Assessment, to the NRCS for review and comment.
Based on the response from the NRCS, an estimate of direct and indirect impacts
will be determined on: (1) number of acres that will be directly displaced; (2) areas
where agricultural and timberland operations may be disrupted; and (3) indirect
effects, such as those related to changes in land use.
1. Soils – A soils map of the site will be prepared. Descriptions of each of the soils
indicated and their development limitation will be provided. Information
regarding the need for potential fill material and clearing and grading will be
determined.
ASSUMPTIONS:
1. Construction requirements (such as, but not limited to, excavation and fill amounts)
will be based on preliminary schematics and preliminary engineering.
2. Soils will be identified using U.S. Department of Agriculture Natural Resources
Conservation Service (NRCS) mapping
3. Geotechnical investigation of existing soil conditions will not be performed.
F. HAZARDOUS MATERIALS, SOLID WASTE, AND POLLUTION PREVENTION –
1. Hazardous Materials/Waste Sites – A Level I Environmental Site Assessment
will be conducted to include a thorough review of the history (50 -year
maximum) of the proposed project to identify environmental concern for
contamination or liability from hazardous materials. In addition, a rev iew of
published data and a physical site inspection will be conducted.
Page 117 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
10
Documentation of investigation methods used, results obtained (e.g., site
overview, site history, regulatory compliance history, site features, and site
walkover survey), and a summary of findings and recommendations for further
investigation, if necessary, will be provided.
ASSUMPTIONS:
1. No subsurface investigations will be conducted.
2. A Level II - Environmental Site Assessment will not be conducted.
3. Phase I ESA performed for the EA will be used for the purchase of the 12 properties
identified for acquisition.
1. Solid Waste Impact – Proposed development, which relates only to airfield
development (runways, taxiways, and related items), will not normally include
any direct relationship to solid waste collection, control, or disposal other than
that associated with the construction itself.
2. Pollution Prevention – Agencies are required to comply with applicable
pollution control standards, in the prevention, control, and abatement of
environmental pollution; and consult with the federal, state, and local
agencies concerning the best techniques and methods availab le for the
prevention, control, and abatement of environmental pollution. Pollution
prevention strategies should be outlined in the Airport’s Stormwater Pollution
Prevention Plan and Spill Prevention, Control, and Countermeasures Plan.
These strategies will be discussed.
G. HISTORIC, ARCHITECTURAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES – A
cultural resources survey, to determine the nature and distribution of historical,
archaeological, and architectural resources within the study area, will be
conducted. This survey will at tempt to identify cultural resources and evaluate
identified resources for their potential to meet the criteria of significance of the
National Register of Historic Places (NRHP). This investigation will involve
thorough background research and limited field investigations that will include, at
a minimum, a photo -inventory of structures that are likely to be impacted
(physically or aesthetically) and that appear to be at least 50 years old. In addition,
sufficient information to complete a Standing Structures Form will be collected for
each historic structure. This information will provide the basis for the evaluation
of the structure with respect to the criteria of significance of the NRHP.
The cultural resources survey will meet the guidelines set forth by the State
Historic Preservation Office (SHPO). The background research is designed to
provide a description of the kinds of cultural resources likely to be present in the
Page 118 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
11
study area. In addition, this research will outline those aspects of the cultural
heritage, evident in the study area, which are significant in the development of
the region. This information is necessary to properly evaluate the eligibility of an
identified cultural resource for the NRHP. This research will involve the review of
historic maps of the region and reports on file with the SHPO and other cultural
resource agencies. Field inspection will be limited; a historic -architectural survey
team will examine standing structures within the study area and an archaeological
team will perform a cursory overview of the study area in search of prehistoric,
archaeological, and paleontological resources. A Phase I Cultural Resources Report
will be prepared and forwarded to the SHPO by the of the biological assessment
requesting compliance with the National Historic Preservation Act of 1966, as
amended.
ASSUMPTIONS:
1. FAA will be responsible for correspondence with Indian Tribes regarding the project.
2. No consultation with the Indian Tribes will be conducted. Should it be determined that
consultation is required, this will be prepared as an amendment to this contract.
3. If the SHPO determines that a Phase II Cultural Resources Survey is necessary, this task
will be performed under a contract amendment.
H. COMPATIBLE LAND USE – Existing land use within the study area (study area – 0.5
miles around HXD and the proposed project site) will be inventoried by windshield
surveys. Land use plans and zoning codes will be collected and reviewed. Land use
types, to be identified, will include residential, commercial, industrial, and noise
sensitive sites (parks, schools, churches, etc.). In addition, community facilities and
existing utilities will be inventoried. Information collected will be reviewed.
Evaluation of e xisting land use and land use planning will include impacts to
existing zoning, conformance with adopted comprehensive plans, impacts to
neighborhoods, and cumulative impacts.
ASSUMPTION:
1. Available land use and zoning data will be provided by the COUNTY and Town of Hilton
Head Island.
I. NATURAL RESOURCES AND ENERGY SUPPLY – In general terms, the potential
energy consumption required to implement the project during construction and
throughout its life will be determined. Energy conservation measures will be
evaluated, if necessary.
J. NOISE – The proposed project is not anticipated to have an adverse impact on the
surrounding community from noise generated by additional aircraft using HXD.
Page 119 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
12
However, a noise analysis will be performed using the Aviation Environmental
Design Tool (AEDT) 2c to determine the potential impact of noise on the
surrounding community for the existing and proposed conditions. Noise contours
will be produced ranging fro m 65 dB DNL to 80 dB DNL at 5 dB increments and
plotted on the Airport Layout Plan or an aerial image of the Airport.
ASSUMPTIONS:
1. FAA Aviation Environmental Design Tool (AEDT) 2c will be used to determine potential
impacts.
2. No monitoring of existing noise will be performed as part of this scope of services.
K. SOCIOECONOMIC IMPACTS AND CHILDREN’S HEALTH AND SAFETY RISKS –
1. Socioeconomic Impacts – The impact of the proposed project on potential
relocation of residences and/or businesses, changes in surface transportation
patterns, disruption of planned development, and significant changes in the
potential employment base will be analyzed. Should potential relocations
occur, provisions of the Uniform Relocation Assistance and Real Property
Acquisition Policies Act of 1970, as amended, will be utilized to determine
compliance.
2. Children’s Health and Safety Risks – Executive Order 13045, Protection of
Children from Environmental Health Risks and Safety Risks (April 23, 1997),
directs federal agencies to identify and assess environmental health risks and
safety risks that may disproportionately affect children. Environmental health
risks and safety risks include risks to health or to safety that are attributable
to products or substances that a child is likely to come in contact with or ingest,
such as air, food, drinking water, recreational waters, soil, or products they
might use or be exposed to. A cursory qualitative analysis of potential risks will
be performed.
ASSUMPTION:
1. A detailed quantitative risk assessment will be performed under a contract
amendment, if deemed necessary.
L. VISUAL EFFECTS –
1. Light Emissions – Consideration of the extent to which any lighting associated
with the proposed project will create an annoyance to people in the vicinity of
the airport will be determined.
Page 120 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
13
2. Visual Impacts – Visual impact will be identified by examining the visual
viewshed, which takes into account the entire landscape and is comprised of
two main aspects: views to and views from. If necessary, mitigative measures
to avoid adverse visual impacts will be discussed.
M. WATER RESOURCES –
1. Wetlands – Jurisdictional wetland areas will be identified, and their size,
location, type, and function/value estimated, in consultation with the U.S.
Army Corps of Engineers (USACE) and other appropriate federal and state
agencies. Available reference materials will be reviewed, and field
investigations will be conducted. Results of the wetland delineation and
proposed mitigation plan, if necessary, will be prepared.
ASSUMPTIONS:
1. Surveying of wetland boundaries will be performed by GPS and a jurisdictional
determination prepared and submitted to the USACE for verification.
2. Permitting and mitigation are not included in this Work Authorization.
2. Floodplain – A topographic map with the project boundaries (with 1 -foot
contour intervals) will be prepared indicating major land surface features. In
addition, the 100 -year floodplain and floodway boundaries will be identified
and described (no field work or flaggi ng of floodplain boundaries will be
conducted). In accordance with Executive Order 11988, floodplain impacts will
be identified such as effects to existing floodplain values, support of
incompatible floodplain development, etc.
ASSUMPTIONS:
1. Topographic mapping used in the preparation of the Master Plan Update will be used.
2. Floodplain boundaries will not be identified in the field.
3. Existing FEMA mapping will be used to identify floodplains.
3. Water Quality – The ambient conditions of streams and other water bodies
likely to be impacted by the proposed project will be described. Where
available from the review agencies, data for surface water and groundwater
quantity and quality will be cited. Potential impacts to water quality will be
discussed. Mitigation, in the form of retention/detention basins, runoff
channels, etc., will be developed in accordance with COUNTY requirements
and federal, state, and local stormwater and water quality regulations.
Page 121 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
14
4. Wild and Scenic Rivers – Wild and scenic rivers within the study area will be
identified and potential impacts discussed. Opportunities for the proposed
project to provide public access to recreational and scenic amenities at such
waterways will be investigated. Mitigative measures, if necessary, will be
investigated.
N. CUMULATIVE IMPACTS – TBE will discuss the
reasonably foreseeable Impacts on a category-by-category basis for those where
impacts will be anticipated. This will include land use, water quality, social,
economics, wetlands and other topics for which this discussion will be
appropriate.
ASSUMPTION:
1. Indirect and cumulative impact analysis will be performed under a contract
amendment, if deemed necessary.
O. IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES – Discussion of
the use of resources will be outlined in this section.
P. PERMITS – Environmental permits required for construction of the proposed
project will be identified and a brief description of regulatory requirements will be
provided for each.
TASK 4: DRAFT ENVIRONMENTAL DOCUMENTATION
TBE will prepare a draft environmental assessment (DEA) in accordance with the
requirements of National Environmental Policy Act of 1969 (NEPA), FAA Order 5050.4B,
National Environmental Policy Act (NEPA) Implementing Instructions for Airport Projects
(April 28, 2006), FAA Order 1050.1F – Environmental Impacts: Policies and Procedures
(July 16, 2015), and 1050.1F Desk Reference (July 2015), utilizing the technical material
previously collected (Task 3). The document will be concise and will include support
documents, as necessary. Electronic copies of the preliminary DEA will be distributed for
review and comment. Comments will be incorporated, and electronic copies o f the
approved draft document will be prepared for general distribution to the reviewing
agencies. The DEA will address the following items:
A. PURPOSE AND NEED – This section will provide a description of the proposed
action that addresses, at a minimum:
1. Project purpose
Page 122 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
15
2. Proposed action
3. Relationship of the proposed action to applicable federal, state, and local rules
and regulations
4. Public need for the proposed action
B. ALTERNATIVES – This section will discuss the no build and build alternatives.
C. AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES – TBE will use
the environmental inventory previously conducted to describe the environmental
setting in the local, regional, and statewide context. This will serve as the
background for preparation of the impact analysis section of the draft document.
The impact and mitigation portion of the DEA will identify and describe the
primary, secondary, and cumulative environmental impacts on the natural,
human, and economic resources. Primary impacts are environmental changes
occurring as a result of the proposed action. Secondary impacts are those impacts
that extend to the surrounding area from the implementation of the proposed
action. Cumulative impacts are normally those occurring over a long period of
time that is precipitated directly or indirectly from implemen tation of the
proposed action. Mitigation plans, if required for unavoidable adverse impact will
also be discussed.
D. AGENCY AND PUBLIC INVOLVEMENT – A discussion of agency coordination and
public involvement and input will be included in the document.
E. PREPARERS – A list of people responsible for preparation of the draft document
will be included in the document.
F. APPENDICES – Appendices will be included only for analytical information that
substantiates an analysis pertinent to the document.
ASSUMPTIONS:
1. No build alternatives analysis will be performed.
2. The draft purpose and need section of the DEA document will be provided to the FAA
for approval.
3. The COUNTY and FAA will review the preliminary DEA document concurrently and will
provide comments to TBE.
4. TBE will assume one (1) concurrent independent review by the COUNTY and FAA prior
to approval of the DEA.
5. TBE understands that additional layers of review at the FAA are now required for legal
sufficiency. As such, more than one round of comments will be provided by the FAA.
Page 123 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
16
DELIVERABLES
1. Electronic copies of the preliminary DEA for review.
2. El ectronic copies of approved DEA.
3. Two (2) hard copies of approved DEA for public review.
TASK 5: ADVERTISE, CONDUCT PUBLIC HEARING WORKSHOP, AND EVALUATE
COMMENTS
A. PUBLIC HEARING WORKSHOP –
1. The COUNTY will arrange for the location of the public hearing workshop.
2. TBE will prepare the notice of opportunity for a public hearing workshop.
3. Preparation for the Public Hearing Workshop – Prepare two (2) sets of color-
coded exhibits that identify inventoried resources associated with the
proposed action, comment forms, maps and other graphics, and have on hand
ten (10) copies of the DEA.
4. Public Workshop Hearing Attendance – TBE will attend the public workshop
and will provide technical assistance and support to the COUNTY. TBE will have
a recorder for oral comments.
5. Public comments received during the public comment period before, during,
and after the public hearing workshop will be reviewed, categorized, and
evaluated by the COUNTY and TBE. Appropriate responses will be included in
the final document.
ASSUMPTIONS:
1. The COUNTY will select and provide the location for the public hearing workshop.
2. FAA will review and approve the notice of availability prior to issuance.
3. TBE will provide two (2) copies of the DEA for the public workshop.
4. TBE will provide two (2) sets of graphics for identifying the major environmental
resources associated with the proposed project.
5. TBE will prepare the referenced graphics and written materials normally associated
with this task and attend the public hearing workshop.
Page 124 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
17
TASK 6: FINAL ENVIRONMENTAL DOCUMENTATION
TBE will revise the DEA in accordance with the appropriate regulatory guidance
referenced in Task 4. Electronic copies each of the preliminary final environmental
assessment (FEA) will be distributed for review and comment. Comments will be
incorporated, and electronic copies of the approved FEA will be prepared for general
distribution to those agencies having provided substantive comments into the FEA. The
FEA will include but not be limited to addressing the following issues:
A. Revise project description to reflect changes as a result of circulation of DEA and
input received from the public hearing process.
B. Revise maps and drawings to reflect changes in location, design, and impact.
C. Attach written comments received following DEA circulation and public
information workshop. Address both verbal and written comments received.
D. List environmental commitments.
ASSUMPTIONS:
1. The COUNTY and FAA will review the preliminary FEA concurrently and will provide
comments to the TBE.
2. TBE understands that additional layers of review at the FAA are now required for legal
sufficiency. As such, more than one round of comments will be provided by the FAA.
3. TBE will assume one (1) concurrent independent review prior to approval of the FEA.
4. FAA will prepare the Finding of No Significant Impact (FONSI).
DELIVERABLES:
1. Electronic copies of the preliminary FEA for review.
2. Electronic copies of approved FEA.
Special Services
Task 1 – Phase Cultural Resources (Brockington and Associates, Inc.)
Provide a Phase I Cultural Resources Analysis for the area of potential effect (APE).
Task 2 – Biotic Communities. Phase I ESA, Wetlands (S&ME, Inc.)
Provide a Biotic Communities (including state and federal threatened and endangered
species, as well as invasive species analysis), Phase I Environmental Site Assessment
report, and wetland jurisdictional determination for the area of potential effect (APE).
Page 125 of 329
Page 126 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
19
Page 127 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
20
Page 128 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
21
Page 129 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
22
Page 130 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
23
Page 131 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
24
Page 132 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
25
Page 133 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
26
Page 134 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
27
Page 135 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
28
Page 136 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
29
Page 137 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
30
Page 138 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
31
Page 139 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
32
Page 140 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
33
Page 141 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
34
Page 142 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
35
Page 143 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
36
Page 144 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
37
Page 145 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
38
Page 146 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
39
Page 147 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
40
Page 148 of 329
Talbert, Bright & Ellington, LLC
Work Authorization 2119-2404
41
Page 149 of 329
Page 150 of 329
Page 151 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION TO APPROVE A RESOLUTION TO ACCEPT A SOUTH CAROLINA AVIATION COMMISSION
(SCAC) GRANT FOR THE HILTON HEAD ISLAND AIRPORT (HXD) ADMINISTRATION BUILDING CONCEPTUAL
(DESIGN)
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of a resolution to accept a SCAC Grant for the HXD Administration Building Project
(Design).
Committee Options: Motion to approve/deny a resolution to accept a SCAC Grant for the HXD Administration
Building Project (Design).
Council Options: Motion to approve/deny a resolution to accept a SCAC Grant for the HXD Administration
Building Project (Design).
Next step: County Council Meeting - September 8, 2025
PRESENTER INFORMATION:
Jon Rembold, Airports Director, 3 minutes
ITEM BACKGROUND:
The Airport Administration Building Project (Conceptual Design) involves preparing a conceptual design
package for the building located at 26 Hunter Road on Hilton Head Island, SC. This project is essential to
supporting the ongoing development and operational needs of the Hilton Head Island Airport as it continues
to serve the growing aviation demands of the region. The scope of work includes comprehensive conceptual
design services to ensure the planned project at 26 Hunter Road meets operational requirements. Design
elements will meet applicable regulations for airport administrative and airport security facilities to support
continued safe and efficient operations at HXD. This project represents a critical investment in the airport's
infrastructure planning and will provide the foundation for future improvements to the administrative
facilities at Hilton Head Island Airport. The current administrative office must be demolished due to FAA
regulatory requirements because of its location.
FISCAL IMPACT:
The design package of the project is 100% funded by state grants utilizing Airport Entitlement funding.
GL Code 5402-90-0000-57130 | Current Encumbered Balance: $37,823,683.00
APPROVAL HISTORY:
The Beaufort County Airports Board is scheduled to approve the proposed resolution to accept the grant
Page 152 of 329
during its regular meeting on August 14, 2025.
Page 153 of 329
1
PROJECT GRANT APPLICATION
(State Aid for Development of Public Airports)
SCAC Grant No: ____
(Leave blank – For SCAC Use only) Date
PART I - PROJECT INFORMATION
Grant Type being Requested (Check one):
2.5% State match of 95% AIP Grant
5% State match of 90% AIP Grant
50% Terminal Building Development Grant (NTE $500,000)
60% State – Local Airport Development Grant
75% State – Local Airport Maintenance Grant
90% Non-NPIAS, publicly owned, Airport Maintenance or Development Grant
90% NPIAS Airport Secondary Runway Redevelopment Grant
100% Commercial Service Airport Entitlement Funds
100% Commercial Service Special Allocation
___% Other – _________________________________________
The (Airport Sponsor) ____________
(herein called the “Sponsor”) hereby makes application to the South Carolina Aeronautics
Commission (herein designated “SCAC") for a grant of State funds pursuant to applicable statutes,
regulations, and policies, for the purpose of aiding in financing a project (herein called the
"Project") for the development of the _________ (herein called the
"Airport") located in the County of ________ in the State of South Carolina.
It is proposed that the project consist of the following described airport development (Insert brief
project description / title below):
all as more particularly described in the plans and specifications separately submitted to SCAC on
(Date) , which are made a part hereof by reference.
If applicable, please list numbers of all associated AIP / AIG Grant(s): ________________________
________________________________________________________________________________
X
Beaufort County
Hilton Head Island Airport
Work Authorization for Airprot Admin Building Design
6/4/2025
Beaufort County
Page 154 of 329
2
PART II - REPRESENTATIONS
The Sponsor hereby represents and certifies as follows:
1. Legal Authority. The Sponsor has the legal power and authority:
(A) To do all things necessary to undertake and carryout the Project in
conformity with the applicable statues, regulations, and policies;
(B) To accept, receive and disburse grant funds from the State of South Carolina
in aid of the project on the terms and conditions stated in the applicable
statutes, regulations, policies, and proposed grant agreement, and;
2. Funds. The Sponsor now has on deposit $ _______ for
use in defraying the costs of the Project. The present status of these funds is as
follows:
The Sponsor hereby designates (insert name and job title of staff member):
Name: ____
Title: __________________________________________
to receive payments representing SCAC's share of the Project costs.
Printed Name of Sponsoring Agency's Representative
Signature of Sponsoring Agency's Representative
Representative Title
Please list the full name, title, and complete USPS mailing address of the authorized person to
whom the Grant offer and agreement should be mailed:
Name, Title: __________________________________________________
Address: _____________________________________________________
__________________________________________________________
in the Hilton Head Island Airport Capital Fund
Airport Deputy Director
Stephen Parry
Stephen Parry
Airport Deputy Director
Stephen Parry, Airport Deputy Director
26 Hunter road
Hilton Head Island, SC 29926
Page 155 of 329
3
ATTACHMENT A
THE FOLLOWING IS A SUMMARY OF THE ACTUAL PROJECT COSTS:
ITEM
TOTAL ESTIMATED
COST
ESTIMATED
SPONSOR'S SHARE
OF COST
ESTIMATED
FEDERAL SHARE
OF COST
ESTIMATED
STATE SHARE OF
COST
AMOUNT AMOUNT AMOUNT
1. PLANNING COST
2. LAND COST
3. CONSTRUCTION COST
4. ENGINEERING COST
5. ADMINISTRATIVE COST
6. MISCELLANEOUS
7. TOTAL ALL ESTIMATED
PROJECT COSTS
Rules for Reimbursing Project Costs Prior to the Grant Execution Date:
Unless specifically recommended by the Executive Director and approved in advance by the Commission, all
project costs must be incurred after the execution date of the Airport Development or Aviation Education
grant. Exceptions to this rule include:
Land or avigation easement acquisitions
Airfield facility emergencies not covered by insurance
Project exceptions identified in the relevant section of the FAA’s AIP Handbook
This policy does not prohibit grant amendments for change orders that arise during construction, provided
they are communicated with SCAC Airport Development staff in advance and approved by Commission.
$40,505.12
$40,505.12
$40,505.12
$40,505.12
Page 156 of 329
4
ATTACHMENT B
DOCUMENTATION SUPPORT
1. Is this project a result of facility requirements determined by a Master Plan, Airport Layout Plan (ALP),
the South Carolina Airport System Plan, or a revision to the ALP? ______Yes _______No
If so, indicate FAA or SCAC approval date:
2. Does this project require an Environmental Impact Assessment (EIAS) report under the National
Environmental Policy Act of 1969 (NEPA)? Yes No
3. Status of EIAS
4. Have all previous projects that involved federal and / or state funds been completed?
Yes No (List all Open Federal and State Grants below)
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________
_________________________________________
5. If the State is unable to participate to the extent requested, what is the Sponsor's ability to fund a
share greater than the State match?
6. Name of Regional Planning Council which airport is located:
7. Has Federal Application Form 424 been submitted to the Inter -agency Council on Public
Transportation (State Clearinghouse) in accordance with Section 57-3-1050? ________Yes
No
8. The following action has been taken by the local governing body to provide steps toward protective
zoning of the airspace and land surrounding the airport. Describe actions by the Sponsor and
governing body related to land use planning and zoning ordinances.
9. Anticipated date construction or planning / design project is to commence:
Start Date: Ending Date:
X
NA
X
NA
X
3-45-0030-050-2022
3-45-0030-051-2022
3-45-0030-054-2023
3-45-0030-055-2024
3-45-0030-056-2024
3-45-0030-057-2024
3-45-0030-058-2024
3-45-0030-059-2024
23-019
23-029
23-025
23-063
24-001
24-025
24-026
Lowcountry Council of Governments
X
Utilizing Airport Entitlement funding
Sponsors ability to match is limited
NA
8/01/2025
3/01/2026
Page 157 of 329
5
ENCLOSURES
1. Project information and Justification Statement
2. Request-for-Aid / Project Sketch
3. Bid tabulation (Construction projects)
4. Work Authorization / Task Order
5. Copy of Federal Application Form 424 (if this request is associated with an FAA AIP / AIG
Grant)
(Revised: April 23, 2025)
Page 158 of 329
Talbert, Bright & Ellington, LLC.
Work Authorization 2119-2202
1
HILTON HEAD ISLAND AIRPORT
HILTON HEAD ISLAND, SOUTH CAROLINA
WORK AUTHORIZATION 22-02
March 18, 2025
PROJECT NO.: TBI NO. 2119-2202
It is agreed to undertake the following work in accordance with the provisions of our
Contract for Professional Services.
Description of Work Authorized: Preparation of a Concept ual Design Package for the
buildings located at 26 Hunter Road on Hilton Head Island, SC.
Estimated Time Schedule: Work shall be completed in accordance with the schedule
established and agreed upon by the Owner and Engineer.
Cost of Services: The method of payment shall be in accordance with Section 3 of the
contract and Exhibit C . The work shall be performed in accordance with Section 1 as a
lump sum of $12,505.12 including reimbursable expenses . Special services shall be
performed on a not to exceed basis with a budget of $28,000.00, which includes
reimbursable expenses. For a total of $40,505.12.
Agreed as to Scope of Services, Time Schedule and Budget:
APPROVED:
BEAUFORT COUNTY
APPROVED:
TALBERT, BRIGHT & ELLINGTON, LLC
President
Title Title:
Date: Date:
Witness: Witness:
Page 159 of 329
Talbert, Bright & Ellington, LLC.
Work Authorization 2119-2202
2
Page 160 of 329
Talbert, Bright & Ellington, LLC.
Work Authorization 2119-2202
3
Page 161 of 329
Talbert, Bright & Ellington, LLC.
Work Authorization 2119-2202
4
Page 162 of 329
Talbert, Bright & Ellington, LLC.
Work Authorization 2119-2202
5
Page 163 of 329
RESOLUTION 2025/
A RESOLUTION TO ACCEPT A SCAC GRANT FOR THE HILTON HEAD
ISLAND AIRPORT (HXD) AIRPORT ADMINISTRATION BUILDING PROJECT
(DESIGN) - CONTINGENT UPON FINAL GRANT OFFER
WHEREAS, the Hilton Head Island Airport (HXD) requires professional design services
for the conceptual design package of the building located at 26 Hunter Road on Hilton Head Island,
SC; and
WHEREAS, the Airport Administration Building Project is necessary to support the
ongoing development and operational needs of the Hilton Head Island Airport; and
WHEREAS, the project involves the preparation of a conceptual design package for the
building at 26 Hunter Road, which will include comprehensive planning and design compliance
with applicable standards; and
WHEREAS, the grant will be used to fund the Airport Administration Building Project
(Design) at the Hilton Head Island Airport. The total SCAC grant is $40,505.12.
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly
assembled, does hereby authorize the County Administrator to accept a SCAC Grant for the Hilton
Head Island Airport (HXD) Administration Building Project (Design).
Adopted this ____ day of __________, 2025
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chairman
ATTEST:
___
Sarah W. Brock, Clerk to Council
Page 164 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION OF AWARD TO INFRASTRUCTURE CONSULTANTS & ENGINEERING FOR THE 2025
PAVEMENT EVALUATION & MAINTENANCE PLAN $355,294.50.
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends award to Infrastructure Consultants & Engineering for the 2025 Pavement Evaluation &
Maintenance Plan $355,294.50.
PRESENTER INFORMATION:
Bryan Bauer, PE, Director of Engineering (5 min)
ITEM BACKGROUND:
Pavement condition surveys of the Beaufort County pavement network were completed in 2017 and 2022.
These assessments provided the basis for 5-year pavement maintenance plans. A Request for Qualifications
was posted on March 5, 2025, for a new pavement evaluation and ten-year maintenance plan. On April 8,
2025, the County received seven proposals which were reviewed and scored by five evaluators. Negotiation
with the top-ranked firm established the contract amount. This contract will provide a pavement survey of all
Beaufort County roads (approximately 230 centerline miles), evaluation and calculation of the pavement
condition index for all roads, development of ten-year maintenance plan as well as quantities and cost
estimates for the first two years of the plan. It also includes pavement survey and evaluation of various roads
for other municipalities within the County. An inventory and condition rating of pavement markings, signs and
sidewalks within the road right of way are also included in the contract as alternate scope items.
FISCAL IMPACT:
The contract fee is $322,995.00. Staff recommend a 10% contingency of $32,299.50, bringing the project
budget to $355,294.50. Funding of $63,900 for the cost of the alternate scope items will be from Public Works
GL account 1000-30-1301-51170 with a balance of $485,665.24 The funding for the balance of this contract
will be from the Beaufort County Transportation Committee (CTC) infrastructure account number 2343-30-
0000-54500 with a balance of $3,331,038.40.
An Intergovernmental Agreement with the City of Beaufort, the Town of Bluffton, the Town of Port Royal and
the Town of Hilton Head Island is being presented separately.
APPROVAL HISTORY:
Page 165 of 329
1
STATE OF SOUTH CAROLINA )
) CONTRACT
COUNTY OF BEAUFORT ) Pavement Evaluation & Maintenance Plan
THIS CONTRACT (hereinafter the "Contract") entered into this 1st day of July , 2025 , between the
COUNTY OF BEAUFORT, South Carolina, a public body corporate and politic and political subdivision
of the State of South Carolina, (hereinafter "County") and Infrastructure Consulting & Engineering, LLC,
(hereinafter the "Consultant"), ("Party" as to each; collectively the "Parties")
WITNESSETH:
WHEREAS, the County wishes to contract for Pavement Evaluation & Maintenance Plan (the "Work"
and/or "Services"); and
WHEREAS, the Consultant has represented to the County that its staff is qualified to provide the Work
required in this Contract in a professional, timely manner; and
WHEREAS, the County has relied upon the above representations by the Consultant;
NOW, THEREFORE, in consideration of these premises and covenants set forth herein, it is agreed by and
between the Parties as follows:
SECTION ONE
Contract Documents
The Parties agree that the Contract Documents shall include the following, which are incorporated herein
by reference:
Exhibit A: Consultant's Estimate with Scope included dated June 9, 2025.
Exhibit B: RFQ 040825
In the event of any conflict, discrepancy, or inconsistency among any of the documents which make up this
Contract, the following shall control:
As between the Contract and the Contract Documents which make up this Contract, the Contract
shall govern.
In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents,
the Consultant shall the County immediately upon discovery of the same for resolution by the
County.
Any documents not included or expressly contemplated in this Contract do not, and shall not, form
a part of this Contract. The Contract Documents are intended to be complementary, and a
requirement in one document shall be deemed a requirement in all documents.
SECTION TWO
Scope of Work
The Consultant agrees to perform and furnish all labor, supervision, materials, equipment, transportation
and supplies necessary for the completion of the Work required under this Contract in a timely and
Page 166 of 329
2
workmanlike manner, professional in all aspects, and in accord with all applicable laws, rules and
regulations.
The Consultant shall provide the services outlined below in conjunction with the Consultant's Estimate
dated June 9, 2025 marked as Exhibit A, that was previously incorporated by reference. The Consultant
shall commence the Work as specified in the Notice to Proceed, when it is issued, but not before it is issued.
Coordination of the Work and administration of this Contract shall be by the Engineering .
SECTION THREE
Contract Price: Payment Terms
County agrees to pay for the performance of the Work described in this Contract, including all items
necessary to accomplish and complete the Work, in accordance with all terms and conditions as stated
herein on the following basis:
Contract Amount: Three Hundred Twenty-Two Thousand Nine Hundred Ninety -Five Dollars and
Zero Cents ($322,995)
Payments:
Consultant shall be paid on a percentage complete basis with the submission of monthly invoices; monthly
payments will be made based on a percentage of services rendered and any expenses incurred. Final
payment which shall be paid upon Final Acceptance by the County's authorized representative. Final
Acceptance is defined as the County accepting the Scope of services from the Consultant when the County
deems the Scope of services completed in accordance with the terms of the Contract.
Final Payment is defined as the last payment from the County to the Consultant of the entire unpaid balance
of the Contract sum as adjusted by any approved change orders.
Application for payment shall be prepared and submitted electronically. All invoices shall be
addressed Engineering, PO Drawer 1228 Beaufort SC 29901.
SECTION FOUR
Time: Term of Contract
The County hereby contracts with Consultant to provide the Scope of services specified herein within Nine
(9) Months after issuance of the Notice to Proceed.
The County reserves the right to extend the term of this Contract, if it is determined to be in its best interest.
SECTION FIVE
Insurance Requirements
The Consultant, at its own expense, shall at all times during the term of the Contract, maintain Professional
Liability Insurance, The County may contact the Consultant's insurer(s) or insurer(s)' agent(s) directly at
any time regarding the Consultant's co verages, coverage amounts, or other such relevant and reasonable
issues related to this Contract. The Consultant shall also require any sub- Consultants to carry the same
coverages in the same amounts. The County must be advised immediately of any changes i n required
coverages.
Page 167 of 329
3
SECTION SIX
Compliance with Legal Requirements
All applicable federal, state, and local laws, ordinances, and rules and regulations of any authorities
(including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of
Revenue or the S.C. Board of Consultants) shall be binding upon the Consultant throughout the pendency
of the Scope of services. The Consultant shall be responsible for compliance with any such law, ordinance,
rule, or regulation, and shall hold the County harmless and indemnify same in the event of non-compliance
as set forth in the Contract.
The Consultant certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of South
Carolina Code of Laws (1976, as amended) and agrees to provide to the State upon request any
documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable to the Consultant and
its subConsultants or sub- subConsultants; or (b) that the Consultant and its subConsultants or sub-
subConsultants are in compliance with Title 8, Chapter 14.
Pursuant to Section 8- 14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent
document, statement, or report pursuant to this chapter is guilty of a felony and, upon conviction, must be
fined within the discretion of the Court or imprisoned for not more than five years, or both."
The Consultant agrees to include in any contracts with subConsultants, language requiring subConsultants
to (a) comply with applicable requirements of Title 8, Chapter 14, and (b) include in its contracts with the
subConsultants language requiring the sub-subConsultants to comply with the applicable requirements of
Title 8, Chapter 14.
The Consultant agrees to and shall certify agreement to abide by the requirements under Title VI of the
Civil Rights Act of 1964, and other non-discrimination authorities under Federal Executive Order Number
11246, as amended, and specifically, the provisions of the equal opportunity clause.
The Consultant shall comply with all applicable federal, state, and local laws, ordinances, rules, and
regulations of any authorities throughout the duration of this Contract. The Consultant shall be responsible
for compliance with any such applicable law, ordinance, rule, or regulation, and shall hold the County
harmless and indemnify same in the event of non-compliance.
SECTION SEVEN
Drug-free Workplace Act
The Consultant shall comply with the South Carolina Drug-free Workplace Act, Section 44-107-10 et seq.,
S.C. Code of Laws (1976, as amended). The County requires all Consultants executing contracts for a stated
or estimated value of $50,000 or more to sign a Drug-free Workplace Certification form prior to the issuance
of the Notice to Proceed.
SECTION EIGHT
Contractor's Warranties and Representations
The Consultant represents that its staff is knowledgeable about and experienced in performing the Scope of
services required in this Contract.
Page 168 of 329
4
The Consultant warrants and represents that it shall be responsible for all subConsultants scope of services
directly for it, as well as for their scope of services product, as though the Consultant had performed the
Scope of services itself.
If equipment, materials, and supplies are to be a part of the service provided, all equipment, materials, and
supplies incorporated in the Scope of services covered by the bid and provided by the Consultant are to be
new and of the most suitable grade for the purpose intended. Unless otherwise specifically provided in this
Contract, reference to any equipment, material, article, or patented process, by trade name, make or catalog
number, shall not be construed as limiting competition. When requested, the Consultant shall furnish to the
Purchasing Director, for approval the name of the manufacturer, the model number, and other identifying
data and information respecting the performance, capacity, nature and rating of the machinery and
mechanical and other equipment which the Consultant contemplates incorporating in the Scope of services.
When required by this Contract or when called for by the Purchasing Director, the Consultant shall provide
full information concerning the material or articles that he contemp lates incorporating in the Scope of
services. When so directed, samples shall be submitted for approval at the Consultant's expense, with all
shipping charges prepaid. Machinery, equipment, material, and articles installed or used without the
required prior approval of the County shall be at the risk of subsequent rejection by the County.
SECTION NINE
Retention of Records
The Consultant agrees to maintain for three (3) years from the date of Final Payment, or until the end of
any audit or closure of all pending matters under this Contract, whichever is later, all books, documents,
papers, and records pertinent to this Contract. The Consultant agrees to provide to the County, any federal
grantor agency, the Comptroller General of the United States, any state grantor agency, any assignee, or
any of their duly authorized representatives access to such books, documents, papers, and records for the
purpose of examining, auditing, and copying them. The Consultant further agrees to include these
provisions in any subcontracts issued in connection with this Contract.
SECTION TEN
State and Local Taxes
Except as otherwise provided, Contract prices shall include all applicable state and local taxes.
The Consultant shall calculate that portion of the Contract that is subject to the six percent (6 %) South
Carolina sales and/or use tax, and this amount shall be itemized and shown on all invoices and shall be paid
to the SCDOR by Consultant. If Consultan t is a non- South Carolina Company, the County will withhold
said amount from all invoices and remit payment to the SCDOR, unless the Consultant furnishes the County
with a valid South Carolina Use Tax Registration Certificate Number.
The Consultant shall indemnify and hold harmless the County for any loss, cost, or expense incurred by,
levied upon or billed to the County as a result of the Consultant’s failure to pay any tax of any type due in
connection with this Contract.
The Consultant shall ensure that the above sections are included in all subcontracts and sub- subcontracts,
and shall ensure withholding on out of state sub and sub-subConsultants to which withholding is applicable.
Page 169 of 329
5
SECTION ELEVEN
Independent Contractor
The Contractor is an independent contractor and shall not be deemed the agent or employee of the County
for any purpose whatsoever. Contractor shall not hold himself out as an employee of the County, and shall
have no power or authority to bind or obligate the County in any manner, except the County shall make
payment to the Contractor for scope of services and expenses as herein provided. The Contractor shall
obtain and maintain all licenses and permits required by law for performance of this Contract by him or his
employees, agents, and servants. The Contractor shall be liable for and pay all taxes required by local, state,
or federal governments, including but not limited to social security, Scope of servicesers' Compensation,
employment security, and any other taxes and licenses or insurance premiums required by law. No
employee benefits of any kind shall be paid by the C ounty to or for the benefit of the Contractor or its
employees, agents, or servants by reason of this Contract.
SECTION TWELVE
Other Contracts
The County reserves the right to undertake or award other contracts for additional scope of
services/services, and may elect to complete portions of the Scope of services/Services included in this
Contract using its own forces or through other contracts, and the Consultant shall fully cooperate with such
other Consultants, County employees and carefully fit its own scope of services/services to such scope of
services/services as may be directed by the County. The Consultant shall not commit or permit any ac t by
its forces or subcontractors which will interfere with the performance of scope of services/services by any
other Consultant or by County and or Department employees.
SECTION THIRTEEN
Permits and Licenses
The Consultant shall, without additional expense to the County, be responsible for obtaining and
maintaining all necessary licenses and permits required by the State of South Carolina, a municipality, or
the County or any other authority having jurisdiction. Prior to execution of a contract, the Consultant may
be required to provide a copy of its current applicable Consultant's License issued by the State of South
Carolina and business license issued by the County. Consultant's (and or any subcontractor's) License
Number, Person's Name and Business Name must all be shown on all required licenses.
SECTION FOURTEEN
Safety, Health, and Security Precautions
The Consultant shall take proper safety, health, and security precautions to protect its scope of services and
the County's property, scope of services, and the public at all times during the term of this Contract. All
materials shall be stored securely, protected from theft or damage.
SECTION FIFTEEN
RESERVED
This section is reserved.
Page 170 of 329
6
SECTION SIXTEEN
Conditions Affecting the Scope of Services
The Consultant shall be responsible for having taken steps reasonably necessary to ascertain the nature and
location of the Scope of services, and the general and local conditions that can affect the Scope of services
or the cost thereof. Any failure by the Consultant to do so will not relieve the Consultant from responsibility
for successfully performing the Scope of services without additional expense to the County. The County
assumes no responsibility for any understanding or representations concerning conditions made by any of
its officers or agents prior to the execution of this Contract, unless such understandings or representations
by the County are expressly stated in this Contract.
SECTION SEVENTEEN
Cleanup Scope of Services: Repair of Damages
If the Consultant is working on-site, the Consultant during the performance of the Scope of services, shall
continuously keep County -provided scope of services space (the "Scope of services Site") and areas
adjacent thereto in an orderly condition, free and clear from debris and discarded materials. Consultant will
restore or replace, when and as directed by the County, any public or private property damaged or destroyed
by Consultant's scope of services, equipment, or employees to a condition at least equa l to that existing
immediately prior to the beginning of the Scope of services.
SECTION EIGHTEEN
Reserved?
This section is reserved.
SECTION NINETEEN
Suspension of Scope of Services
The Purchasing Director may order, in writing, the Consultant to suspend, delay, or interrupt all or any part
of the Scope of services for such period of time as he may determine to be appropriate for the convenience
of the County. The County may suspend p erformance of its obligations under this Contract in good faith
for the convenience of the County or to investigate matters arising in the Scope of services.
The Purchasing Director may order suspension of the Scope of services in whole or in part for such time as
he deems necessary because of the failure of the Consultant to comply with any of the requirements of this
Contract, and the Contract's completion da te shall not be extended on account of any such suspension of
Scope of services.
When the Purchasing Director orders any suspension of the Scope of services under the paragraph above,
the Consultant shall not be entitled to any payment for Scope of services with respect to the period during
which such Scope of services is suspended and shall not be entitled to any costs or damages resulting from
such suspension.
The rights and remedies of the County provided in this Section are in addition to any other rights and
remedies provided by law or under this Contract.
Page 171 of 329
7
SECTION TWENTY
Modification of Contract
The County's Purchasing Director has the unilateral right to modify this Contract, within the general scope
of scope of services described above and in Attachment A, when the modification is in the best interest of
the County, provided however, the Consult ant is given written notice of any such modification and the
County is responsible for paying Consultant for any additional expenses incurred by the Consultant that
relate to the modification. Subject to the above, the Consultant shall immediately notify t he County in
writing of any proposed adjustment in its fee and the schedule for performance. The Consultant is obligated
to perform the revised contract when so directed by the Purchasing Director, and the County is obligated to
pay for the scope of servic es performed pursuant to the modification. No claim by the Consultant for an
adjustment hereunder shall be allowed if asserted after Final Payment under this Contract.
SECTION TWENTY-ONE
Termination
1. For Convenience
The Purchasing Director, by advance written notice, may terminate this Contract when it is in the
best interests of the County. If this Contract is so terminated, the Consultant shall be compensated
for all necessary and reasonable direct costs of performing the Scope of services actually
accomplished. The Consultant will not be compensated for any other costs in connection with a
termination for convenience. The Consultant will not be entitled to recover any damages in
connection with a termination for convenience.
2. For Default
If the Contractor refuses or fails to perform the Scope of services or any separable part thereof in
a timely manner or to the standard of care set forth within the Contract Documents, or otherwise
is in material breach of the Contract Documents such failure shall be deemed a default under this
Contract.
In the event of a default under this Section, the County shall have the right to inform the
Consultant of the default and demand that the Consultant immediately deliver a plan to remedy
the default. If the Consultant does not respond with a timely or reasonably achievable plan, the
County may terminate forthwith this Contract by additional written notice to the Consultant. In
the event of such default, the advance notice period for termination is waived and the Consultant
shall not be entitled to any costs or damages resulting from a termination under this Section.
Whether or not the Consultant's right to proceed with the Scope of services is terminated, it and
its sureties shall be liable for any damage to the County resulting from the Consultant’s default.
Any wrongful termination for default shall be deemed by the Parties a termination for
convenience. In no event, however, shall Consultant or its sureties be liable for lost profits,
indirect, special, punitive, incidental, or consequential damages.
3. Termination for Non-Appropriation of Funds
The Purchasing Director, by written advance notice, may terminate this Contract in whole or in
part in the event that sufficient appropriation of funds from any source (whether a federal, state,
County, or other source) are not made or sufficient funds are otherwise unavailable, in either case,
Page 172 of 329
8
to pay the charges under this Contract. If this Contract is so terminated, the Consultant shall be
compensated for all necessary and reasonable direct costs of performing the Scope of services
actually provided to the date of such termination. The Consultant will not be compensated for any
other costs in connection with a termination for nonappropriation. The Consultant will not be
entitled to recover any damages in connection with a termination for non-appropriation,
including, but not limited to, lost profits.
4. Rights Cumulative
The rights and remedies of the County provided in this Section are in addition to any other rights
and remedies provided by law or under this Contract.
SECTION TWENTY-TW0
Indemnification
Except for expenses or liabilities arising from the negligent or intentional acts of the County, the Consultant
hereby expressly agrees to indemnify and hold the County harmless against any and all expenses and
liabilities arising out of the negligent or i ntentionally wrongful performance, action, or inaction of the
Consultant in conduct of this Contract, as follows:
For matters other than those arising from the rendering or failure to render professional services, the
Consultant expressly agrees to the extent that there is a causal relationship between its negligent or
intentionally wrongful performance, action, or in action, or the negligent or intentionally wrongful
performance, action, or inaction of any of its employees or any person, firm or corporation directly or
indirectly employed by the Consultant and any damage, liability, injury, loss or expense (whether in
connection with bodily injury or death or property damage) that is suffered by the County and/or its officers
or employees or by any member of the public, to indemnify and save the County and its officers and
employees harmless against any and all liabilit ies, penalties, demands, claims, lawsuits, losses, damages,
costs, and expenses arising out of the negligence, action or inaction of the Consultant, regardless of whether
such liabilities, penalties, demands, claims, lawsuits, losses, damages, costs and expenses are caused in part
by the County. Such costs are to include, without limitation, defense, settlement, and reasonable attorney's
fees incurred by the County and its employees. This promise to indemnify shall include, without limitation,
bodily injuries or death occurring to the Consultant's employees and any person, directly or indirectly
employed by the Consultant (including, without limitation, any employee of any subConsultant), the
County's officers or employees, the employees of any other indepen dent Consultants, or occurring to any
member of the public. When the County submits notice, the Consultant shall promptly defend any
aforementioned action.
For matters arising out of the rendering or failure to render professional services, the Consultant will
indemnify and save the County and its officers and employees harmless from and against all third- party
claims lawsuits or demands for liabilities, pena lties, losses, damages, costs, and expenses to the extent
arising out of or resultant from any negligent act, error, or omission of the Consultant in the rendering or
failure to render professional services under this Contract.
Such costs are to include, without limitation, settlement and reasonable attorneys' fees incurred by the
County and its officers and employees where such fees are recoverable under applicable law. This promise
to indemnify shall include, without limitation , bodily injuries or death occurring to the Consultant's
employees and any person, directly or indirectly employed by the Consultant (including, without limitation,
any employee of any subConsultant), the County's officers or employees The limits of insura nce required
Page 173 of 329
9
in this Contract shall not limit the Consultant's obligations under this Section. The terms and conditions
contained in this Section shall survive the termination of the Contract or the suspension of the Scope of
services hereunder. To the extent that any liabilities, penalties, demands, claims, lawsuits, losses, damages,
costs and expenses are caused in part by the acts of the County, the Consultant’s obligations shall be reduced
in proportion to the County's fault. The obligations herein shall also extend to any actions by the County to
enforce this indemnity obligation. The recovery of costs and fees all extend to those incurred in the
enforcement of this indemnity where such fees are recoverable under applicable law.
SECTION TWENTY-THREE
Gratuities and Kickbacks
Gratuities. It shall be unethical for any person to offer, give or agree to give any employee or former
employee, or for any employee or former employee to solicit, demand, accept, or agree to accept from
another person a gratuity or an offer of employment in connection with any decision, approval, disapproval,
recommendation, preparation or any part of a pr ogram requirement or a purchase request, influencing the
content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any
other advisory capacity in any proceeding or application, request for ruling, determinati on, claim or
controversy, or other particular matter pertaining to any program requirement of a contract or subcontract,
or to any solicitation or proposal therefore.
Kickbacks. It shall be unethical for any payment, gratuity, or offer of employment to be made by or on
behalf of a subConsultant under a contract to the prime Consultant, or to hire any subConsultant or any
person associated therewith, as an inducement for the award of a subcontract or order.
Violation of this clause may result in Contract termination.
SECTION TWENTY-FOUR
Labor: Subcontractors
No subcontracts shall be allowed without the prior written approval of the County. The Consultant shall not
contract with a proposed person or entity to whom the County has made reasonable and timely objections.
The Consultant shall not be required to contract with anyone to whom the Consultant has made reasonable
and timely objection.
The Consultant shall enforce strict discipline and good order among its employees and other persons
carrying out the performance of the Contract.
Employment of labor by the Consultant shall be effected under conditions which are satisfactory to the
County. The Consultant shall remove or cause to have removed from the project any employee or
employees who are considered unsatisfactory by the County.
The Consultant assumes the responsibility for assuring that its scope of servicesing forces are compatible
with the County Employees, and the Consultant is responsible for making itself aware of those forces. The
Consultant will furnish a competent representative who is to be kept available to represent the Consultant
for the purpose of receiving notices, orders and instruction. No substitutions shall be made of such
Consultant’s representative without the approval of the County and a replacement by someone with
comparable, skills, experience, and talent.
Page 174 of 329
10
SECTION TWENTY-FIVE
Assignment
The Consultant shall not assign in whole or in part the Contract without the prior written consent of the
County or its Assignee. The Consultant shall not assign any money due or that may become due to it under
said the Contract without the prior written c onsent of the County or its Assignee. Each Party binds itself,
its successors, assigns, executors, administrators, or other representatives to the other Party hereto and to
successors, assigns, executors, administrators, or other representatives of such ot her Party in connection
with all terms and conditions of the Contract.
SECTION TWENTY-SIX
Controlling Law
The laws of South Carolina shall govern this Contract. All litigation arising under this Contract shall be
litigated only in a nonjury hearing in the Court of Common Pleas, Fourteenth Judicial Circuit, Beaufort
County, South Carolina.
SECTION TWENTY-SEVEN
Entire Contract
This Contract constitutes the entire understanding and contract between the Parties hereto and supersedes
all prior and contemporaneous written and oral contracts between the Parties and their predecessors in
interest regarding the subject matter of this Contract. This Contract may not be changed, altered, amended,
modified, or terminated orally, except as specifically provided, and any such change, alteration,
amendment, or modification must be in writing and executed by the Parties hereto.
SECTION TWENTY-EIGHT
Severance
Should any part of this Contract be determined by a Court of competent jurisdiction to be invalid, illegal,
or against public policy, said offending Section shall be void and of no effect and shall not render any other
Section herein, nor this Contract as a whole, invalid. Any terms which, by their nature, should survive the
suspension, termination or expiration hereof shall be deemed to so survive.
SECTION TWENTY-NINE
Non-waiver
Any waiver of any default by either Party to this Contract shall not constitute waiver of any subsequent
default, nor shall it operate to require either Party to waive, or entitle either Party to a waiver of, any
subsequent default hereunder.
Page 175 of 329
11
IN WITNESS WHEREOF, the Parties hereto have executed this Contract under their several seals as of the
day and year first written above.
W
ITNESS: BEAUFORT COUNTY
___________________________________ By:_____________________________
_________
__________________________ Its:______________________________
C
ONSULTANT
___________________________________ By:_____________________________
_________
__________________________ Its:______________________________
President & CEO
Page 176 of 329
1 of 8
Beaufort County
SCOPE OF SERVICES
Pavement Evaluation & Maintenance Plan 2025
________________________________________________
Project Overview
Beaufort County (COUNTY) has requested Infrastructure Consulting & Engineering, PLLC
(CONSULTANT) to provide a scope of services and budget for the RFQ #RFQ 040825 Pavement
Evaluation & Maintenance Plan. This project will deliver a comprehensive, data-driven Pavement
and Maintenance Plan for Beaufort County’s roadway network, with optional alternate proposals
for municipal Routes and other various roadway asset inventory. The scope will include a
Pavement Condition Survey, Development of a Priority List, Development of a 10 year plan, Year
1-2 Cost Estimates, Final Reporting, Alternate Items.
TASK 1. Project Setup and Pavement Condition Survey
The general scope for Task 1 will include a project kick off meeting to discuss the anticipated path
forward for the project and any potential issues that need to be resolved prior to data collection.
Task 1 will be comprised of the following sub tasks.
1.1 Project Setup and Kickoff - COUNTY will provide CONSULTANT with shapefiles to
be utilized during pavement condition and asset inventory data collection.
CONSULTANT anticipates a minimal amount of remedial work will be necessary to
format shapefiles as this work should have been completed in previous phases.
CONSULTANT anticipates that the road inventory attributes identified on pg 4 of
COUNTY Pavement Management Manual are already included and generally
populated in the shapefiles. CONSULTANT will review files and develop a list of
questions about data collection for the COUNTY to discuss at kickoff meeting.
1.2 Data Quality and Verifications – CONSULTANT will perform validation checks for
correlation and repeatability at the beginning of the project, halfway through the
project and at the end of the project to assure COUNTY that all data is accurate
and repeatable.
1.3 Pavement Condition Survey – CONSULTANT will perform a pavement condition
survey based upon ASTM D6433 and in accordance with the guidelines in the
COUNTY Pavement Management Manual. This task will include all labor and
direct expenses related to data collection and quality control for the following
items:
Page 177 of 329
2 of 5
1.3.1 Data will be collected in both directions for all lanes of all county paved
roadways, assumes 500 lane miles.
1.3.2 Alternative scope item is included for Municipal miles as follows: Hilton Head
(16 miles), Port Royal (2 miles), Bluffton (7.5 miles), and the city of Beaufort (13
miles). Data will be collected in both directions for all lanes of all municipal
miles, assumes 95 miles.
1.4 Calculation of Pavement Condition Index (PCI) – CONSULTANT shall perform
analysis of pavement condition survey data and calculate PCI in accordance with
ASTM D6433 and the requirements of the COUNTY Pavement Management
Manual. Results of PCI shall be provided to the COUNTY in a presentation and
discussed prior to moving forward with the remainder of the project scope.
Individual distress measurements and PCI will be published to Hawkeye Insight
and a 1 year subscription will be provided. Subscription renewal shall be $3,500
per year for year 2.
TASK 2. Priority List Development
The CONSULTANT will review the current priority ranking score formula in the COUNTY
Pavement Management Manual and discuss the performance of this approach for previous
phases of the program. CONSULTANT will make recommendations as necessary for any
revisions to help ensure the goals of the program are being met. Final Priority List with be
developed and presented to the COUNTY for review and acceptance.
TASK 3. 10 – Year Maintenance Plan
CONSULTANT will generate a 10 year optimized Maintenance Plan. The following sub tasks will
be included:
3.1. Review Previous Program Performance
Historical construction data and previous pavement condition data will be
compared to the new data gathered in Task 1. These comparisons will be utilized
to gain insight on the performance of the previous maintenance program.
Specifically, the CONSULTANT will seek to develop locally calibrated
improvement, deterioration and cost estimate functions for use in the
development of the new maintenance program. Discussions with COUNTY staff
will also be conducted at this time to help craft any changes or understand any
preferences to the treatments menu in the COUNTY Pavement Management
Manual.
Page 178 of 329
3 of 5
3.2 Development of 10 – Year Maintenance Plan
The CONSULTANT will prepare a 10-year maintenance plan utilizing in-house
excell based software. This plan will follow the guidance of the COUNTY Pavement
Management Manual and seek to obtain an optimized level of performance while
meeting the goals of the Manual. Three (3) iterations of the plan will be
developed for discussion with and consideration by the COUNTY. One (1) of the
iterations will include some effort to group work by treatment type and locations
in a neighborhood approach to maximize contractor efficiency during
mobilizations. Interim meetings will be held to discuss the direction of the plan
iterations prior to beginning task 4. Results will be presented to the county staff
along with discussions about final recommendations. The final recommended
plan will include yearly work lists for contract development.
TASK 4. Year 1-2 Cost Estimates
The CONSULTANT will evaluate each roadway identified in years 1 and 2 of the plan in order to
develop project level estimates and the necessary quantities for bidding work. These estimates
will include an engineers cost estimate for each roadway, strip maps and detailed quantity
breakdowns.
TASK 5. Final Reporting
The CONSULTANT will provide a comprehensive report presented to the COUNTY upon project
completion. This report will include, at a minimum: an executive summary, pavement condition
assessment methodology, pavement condition results and PCI report, a discussion of pavement
deterioration trends, and an explanation of how the previous ratings compare to the new ratings.
It will also outline the funding strategies, treatment types utilized, and projected system
performance over the next 10 years.
Additionally, the final deliverables will include an updated pavement condition database in ArcGIS.
Supporting maps and charts will be developed to clearly illustrate current and projected asset
conditions, as well as planned work across the network.
TASK 6. Alternate Scope Items
If the COUNTY chooses to include the optional evaluation of roadside assets (signs, pavement
markings, RPMs, and sidewalks), CONSULTANT is prepared to assist with asset inventory and
condition rating.
Using the Hawkeye Processing Toolkit, the Team will extract asset information from the roadway
Page 179 of 329
4 of 5
imagery captured during the pavement condition survey. This toolkit allows us to geo-reference
assets with precise GPS coordinates (latitude, longitude, and altitude) and log attributes such as
condition, type, and dimensions. It supports measurement of height, width, and area, enabling
detailed and efficient asset assessments.
CONSULTANT will pre-program rating forms for simple condition categories (e.g., Good / Fair /
Poor). However, more complex fields, such as MUTCD codes for signage, will require manual entry.
The following scope items are prepared individually. There may be some overall savings that could
be realized if multiple tasks are selected.
6.1 RPMs
The CONSULTANT will identify the presence of RPMs on paved COUNTY roadways. The
CONSULTANT will work with the COUNTY to establish an acceptable range of
identification and attributes. For example 100% present, 0-25% present etc. along with
RPM type.
6.2 Pavement Markings
The CONSULTANT will identify the presence of Pavement Markings on paved COUNTY
roadways. The CONSULTANT will work with the COUNTY to establish an acceptable range
of identification and attributes. For example 100% present, 0-25% present etc. along with
Marking type.
6.3 Signs
The CONSULTANT will identify the presence of Signs on paved COUNTY roadways. The
CONSULTANT will work with the COUNTY to establish an acceptable range of
identification and attributes. For example, 5 stop signs present.
6.4 Sidewalks
The CONSULTANT will identify the presence of Sidewalks on paved COUNTY roadways.
The CONSULTANT will work with the COUNTY to establish an acceptable range of
identification and attributes. The presence of sidewalks will first be identified with the
video captured in task 1. CONSULTANT will visit each site with sidewalks to visually survey
the general condition. We anticipate that approximately 20% of roadways will include
sidewalk and that detailed surveys of ADA ramps will not be required.
Page 180 of 329
5 of 5
ENGINEERING FEE
County Roads (500 miles)
COST
TASK 1 Project Setup and Pavement Condition Survey $105,605.00
TASK 2 Priority List Development $20,600.00
TASK 3 10-Year Maintenance Plan $48,200.00
TASK 4 Year 1-2 Cost Estimates $40,960.00
TASK 5 Final Reporting $17,670.00
County Roads: TOTAL ALL TASKS = $233,035.00
Municipal Roads (95 miles)
TASK 1 Project Setup and Pavement Condition Survey $22,480.00
TASK 5 Final Reporting $3,580.00
Municipal Roads: TOTAL ALL TASKS = $26,060.00
Cost Split by Muncipalities
Hilton Head $10,830.13
Port Royal $1,353.77
Bluffton $5,076.62
City of Beaufort $8,799.48
TASK 6 Alternate Scope Items $63,900.00
TOTAL PROJECT INCLUDING Alternate/Optional TASKS = $322,995.00
See attached spreadsheet for fee details.
Page 181 of 329
Beaufort Pavement Evaluation and Maintenance Plan 2025
Task Task Description
1 Project Setup and Pavement Condition Survey
1.1 Project Setup and Kickoff
1.2 Data Quality and Verifications
1.3.1 Pavement Condition Survey - County Roads (500miles)
1.3.2 Calculation of Pavement Condition Index
MANHOUR SUB-TOTAL
LOADED COST
2 Priority List Development
2 Priority List Development
MANHOUR SUB-TOTAL
LOADED COST
3 10 - Year Maintenance Plan
3.1 Review Previous Program Performance
3.2 Development of 10 - Year Maintenance Plan
MANHOUR SUB-TOTAL
LOADED COST
4 Year 1-2 Cost Estimates
4 Cost Estimates
MANHOUR SUB-TOTAL
LOADED COST
5 Final Reporting
5 Final Reporting
MANHOUR SUB-TOTAL
LOADED COST
MANHOUR TOTAL
LOADED COST
Hourly Rate
Page 182 of 329
Project
Manager
Senior
Engineer
Pavement
Engineer
Senior
Construction
Engineer
Construction
Engineer
20 20 20
20 20 20
5 10 20
10 20 40
55 70 100 0 0 0
$ 14,575.00 $ 16,100.00 $ 13,000.00 $ - $ - $ -
20 20 80
20 20 80 0 0 0
$ 5,300.00 $ 4,600.00 $ 10,400.00 $ - $ - $ -
20 40 40
20 40 80
40 80 120 0 0 0
$ 10,600.00 $ 18,400.00 $ 15,600.00 $ - $ - $ -
20 20 80 20 80
20 20 80 0 20 80
$ 5,300.00 $ 4,600.00 $ 10,400.00 $ - $ 4,400.00 $ 10,400.00
16 16 50 5 5
16 16 50 0 5 5
$ 4,240.00 $ 3,680.00 $ 6,500.00 $ - $ 1,100.00 $ 650.00
151 206 430 0 25 85
$ 40,015.00 $ 47,380.00 $ 55,900.00 $ - $ 5,500.00 $ 11,050.00
Project
Manager
Senior
Engineer
Pavement
Engineer 0
Senior
Construction
Engineer
Construction
Engineer
$ 265.00 $ 230.00 $ 130.00 $ 220.00 $ 130.00
Page 183 of 329
GIS Support
Engineer Consultant Lump Sum Direct Expenses Task Total
10 $7,950 $ 300.00
$9,295 $ 450.00
10 $36,885 $ 300.00
25
0 45 0
$ - $ 6,750.00 $ - $54,130 $ 1,050.00 $ 105,605.00
$ 300.00
0 0 0
$ - $ - $ - $ - $ 300.00 $ 20,600.00
$ 300.00
20 $ 300.00
0 20 0
$ - $ 3,000.00 $ - $ - $ 600.00 $ 48,200.00
20 $ 2,860.00
0 20 0
$ - $ 3,000.00 $ - $ - $ 2,860.00 $ 40,960.00
8 $ 300.00
0 8 0
$ - $ 1,200.00 $ - $ - $ 300.00 $ 17,670.00
0 93 0
$ - $ 13,950.00 $ - $54,130 $ 5,410.00 $ 233,035.00
0
GIS Support
Engineer 0 Consultant Lump Sum Direct Expenses
$ 150.00 Actual See Right
$110/Mile Additional
Page 184 of 329
Mileage Hotel Rate
Meal
Reimburse
ments
500
750
500
500
500
500
2000 10 30
500
Mileage Hotel Meal
$ 0.60 $ 91.00 $ 25.00
Page 185 of 329
Beaufort Pavement Evaluation and Maintenance Plan 2025- Muncipal Roads
Task Task Description
1 Project Setup and Pavement Condition Survey
1.1
1.2
5 Final Reporting
2
MANHOUR TOTAL
LOADED COST
Page 186 of 329
Project
Manager
Pavement Condition Survey - Municipal Roads (95miles - Optional) 5
Calculation of Pavement Condition Index 5
MANHOUR SUB-TOTAL 10
LOADED COST $ 2,650.00
Final Reporting 4
MANHOUR SUB-TOTAL 4
LOADED COST $ 1,060.00
14
$ 3,710.00
Project
Manager
Hourly Rate $ 265.00
Municipalilies
Hilton Head
Port Royal
Bluffon
City of beaufort
Beaufort Pavement Evaluation and Maintenance Plan 2025- Muncipal Roads
Task Description
Project Setup and Pavement Condition Survey
Final Reporting
MANHOUR TOTAL
LOADED COST
Page 187 of 329
Senior
Engineer
Pavement
Engineer
Senior
Construction
Engineer
Construction
Engineer
10 10
5 16
15 26 0 0 0 0
$ 3,450.00 $ 3,380.00 $ - $ - $ - $ -
4 10
4 10 0 0 0 0
$ 920.00 $ 1,300.00 $ - $ - $ - $ -
19 36 0 0 0 0
$ 4,370.00 $ 4,680.00 $ - $ - $ - $ -
Senior
Engineer
Pavement
Engineer 0
Senior
Construction
Engineer
Construction
Engineer 0
$ 230.00 $ 130.00 $ 220.00 $ 130.00
Miles Cost Splitting per Muncipal
16.00 $ 10,830.13
2.00 $ 1,353.77
7.50 $ 5,076.62
13.00 $ 8,799.48
38.50 $ 26,060.00
Page 188 of 329
GIS Support
Engineer Consultant Lump Sum Direct Expenses Task Total
10 $10,450 $ 300.00
5
15 0
$ 2,250.00 $ - $10,450 $ 300.00 $ 22,480.00
2
2 0
$ 300.00 $ - $ - $ - $ 3,580.00
17 0
$ 2,550.00 $ - $ 10,450.00 $ 300.00 $ 26,060.00
GIS Support
Engineer 0 Consultant Lump Sum Direct Expenses
$ 150.00 Actual See Right
$110/Mile Additional
Page 189 of 329
Mileage Hotel Rate
Meal
Reimburse
ments
500
500
Mileage Hotel Meal
$ 0.60 $ 91.00 $ 25.00
Page 190 of 329
Beaufort Pavement Evaluation and Maintenance Plan 2025- Alternate Scope Item
Task Task Description
Project
Manager
ICE
6 Alternate Scope Items
1.1 RPMs 10
1.2 Pavement Markings 10
1.3 Signs 10
1.4 Sidewalks 10
MANHOUR SUB-TOTAL 40
LOADED COST $ 10,600.00
Project
Manager
Hourly Rate $ 265.00
Page 191 of 329
Senior
Engineer
Pavement
Engineer
Senior
Construction
Engineer
Construction
Engineer
60
60
60
60 60
0 240 0 0 60 0
$ - $ 31,200.00 $ - $ - $ 7,800.00 $ -
Senior
Engineer
Pavement
Engineer 0
Senior
Construction
Engineer
Construction
Engineer 0
$ 230.00 $ 130.00 $ 220.00 $ 130.00
Page 192 of 329
GIS Support
Engineer Consultant Lump Sum Direct Expenses Task Total
$5,000
15 $ -
15
15 $ -
15 $ 300.00
60 0
$ 9,000.00 $ - $ 5,000.00 $ 300.00 $ 63,900.00
GIS Support
Engineer 0 Consultant Lump Sum Direct Expenses
$ 150.00 Actual See Right
$110/Mile Additional
Page 193 of 329
Mileage Hotel Rate
Meal
Reimburse
ments
500
Mileage Hotel Meal
$ 0.60 $ 91.00 $ 25.00
Page 194 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION OF AWARD TO SANDHILL ALS CONSTRUCTION, INC. FOR THE ALLJOY ROAD SIDEWALK
PROJECT IN THE AMOUNT OF $2,759,374.20.
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of award to Sandhill ALS Construction, Inc. for the Alljoy Road Sidewalk Project in
the amount of $2,759,374.20.
PRESENTER INFORMATION:
Bryan Bauer, P.E., Director of Engineering, 5 Min
ITEM BACKGROUND:
As part of the 2018 one cent transportation sales tax, a program of pathways was identified for construction
to provide better and safer access to pedestrians at key areas in Beaufort County. This project will provide a
safe place for pedestrians along Alljoy Road. The project also includes some clearing, drainage, paving,
waterline relocation, signs, striping, traffic control and erosion control. On May 5, 2025, Beaufort County
published Invitation for Bid (IFB) # 060625 Alljoy Road SIdewalk Project requesting competitive bids for the
material procurement and construction of approximately 1.45 miles of a six-foot concrete sidewalk on Alljoy
Road. On June 6, 2025, the County received two (2) bids to perform the specified scope of work. Sandhill ALS
Construction was the apparent lowest responsive bidder.
FISCAL IMPACT:
The contract fee for materials and construction is $2,508,522.00. Staff recommend a 10% contingency of
$250,852.20 for a total anticipated project budget of $2,759,374.20. The funding for this project is from the
2018 Sales Tax Pathway Fund, account number 4705-80-0000-54500 with a balance of $13,058,089.50.
Partial funding in the amount of $1,177,868.71 will be provided as a reimbursement from a federal
Transportation Alternative Program (TAP) Grant administered by the South Carolina Department of
Transportation.
APPROVAL HISTORY:
Page 195 of 329
1
STATE OF SOUTH CAROLINA )
) CONTRACT
COUNTY OF BEAUFORT ) P041567 Alljoy Road Sidewalk
THIS CONTRACT (hereinafter the "Contract") entered into this 24 th day of July, 20 25, between the
COUNTY OF BEAUFORT, South Carolina, a public body corporate and politic and political subdivision
of the State of South Carolina, (hereinafter "County") and Sandhill ALS Construction, Inc., (hereinafter the
"Contractor"), ("Party" as to each; collectively the "Parties")
WITNESSETH:
WHEREAS, the County wishes to contract for P041567 Alljoy Road Sidewalk (the "Work" and/or
"Services"); and
WHEREAS, the Contractor has represented to the County that its staff is qualified to provide the Work
required in this Contract in a professional, timely manner; and
WHEREAS, the County has relied upon the above representations by the Contractor;
NOW, THEREFORE, in consideration of these premises and covenants set forth herein, it is agreed by and
between the Parties as follows:
SECTION ONE
Contract Documents
The Parties agree that the Contract Documents shall include the following, which are incorporated herein
by reference:
Exhibit A: Contractor's Schedule of Values dated June 6, 2025.
Exhibit B: IFB 060625
In the event of any conflict, discrepancy, or inconsistency among any of the documents which make up this
Contract, the following shall control:
As between the Contract and the Contract Documents which make up this Contract, the Contract
shall govern.
In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents,
the Contractor shall the County immediately upon discovery of the same for resolution by the
County.
Any documents not included or expressly contemplated in this Contract do not, and shall not, form
a part of this Contract. The Contract Documents are intended to be complementary, and a
requirement in one document shall be deemed a requirement in all documents.
SECTION TWO
Scope of Work
The Contractor agrees to perform and furnish all labor, supervision, materials, equipment, transportation
and supplies necessary for the completion of the Work required under this Contract in a timely and
Page 196 of 329
2
workmanlike manner, professional in all aspects, and in accord with all applicable laws, rules and
regulations.
The Contractor shall provide the services outlined below in conjunction with the Contractor's Bid dated
June 6, 2025 marked as Exhibit A, that was previously incorporated by reference. The Contractor shall
commence the Work as specified in the Notice to Proceed, when it is issued, but not before it is issued.
Coordination of the Work and administration of this Contract shall be by Beaufort County.
SECTION THREE
Contract Price: Payment Terms
County agrees to pay for the performance of the Work described in this Contract, including all items
necessary to accomplish and complete the Work, in accordance with all terms and conditions as stated
herein on the following basis:
Contract Amount: Two Million Five Hundred and Eight Thousand Five Hundred Twenty-Two Dollars
and Zero Cents ($2,508,522)
Payments:
Contractor will be paid on a percentage complete basis with the submission of monthly invoices.
Monthly payments will be made based on a percentage of services rendered and any expenses incurred.
Final payment which shall be paid upon Final Acceptance by the County's authorized representative. Final
Acceptance is defined as the County accepting the Work from the Contractor when the County deems the
Work completed in accordance with the terms of the Contract.
Final Payment is defined as the last payment from the County to the Contractor of the entire unpaid balance
of the Contract sum as adjusted by any approved change orders.
Application for payment shall be prepared and submitted electronically. All invoices shall be addressed to
Engineering, PO Drawer 1228 Beaufort SC 29901.
SECTION FOUR
Time: Term of Contract
The County hereby contracts with Contractor to provide the Work specified herein within One Hundred
Eighty (180) calendar days after issuance of the Notice to Proceed.
The County reserves the right to extend the term of this Contract, if it is determined to be in its best interest.
The Contractor expressly acknowledges that time is of the essence in completion of this Contract and that
the time limits and dates herein are critical components of the Contract. Therefore, liquidated damages have
been set at $1,200 per calendar day. The Contractor warrants and represents that it has taken these facts into
consideration and has determined that it can complete the work within these time limits, including time for
likely delays caused by weather or from other sources. The Contractor wil l not be compensated for any
delays beyond the time set forth herein. The Contractor's only remedy for delays may be an extension of
time to perform the Work. Due consideration will be given to claims for an extension of time due to
extraordinary circumstances only.
Page 197 of 329
3
SECTION FIVE
Insurance Requirements
The Contractor, at its own expense, shall at all times during the term of the Contract, maintain insurance as
included in the solicitation, Insurance Requirements, which is attached hereto and previously incorporated
by reference. The County may contact the Contractor's insurer(s) or insurer(s)' agent(s) directly at any time
regarding the Contractor's coverages, coverage amounts, or other such relevant and reasonable issues
related to this Contract. The Contractor shall also require any subcontractors to ca rry the same coverages
in the same amounts.
The County must be advised immediately of any changes in required coverages.
SECTION SIX
Compliance with Legal Requirements
All applicable federal, state and local laws, ordinances, and rules and regulations of any authorities
(including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of
Revenue or the S.C. Board of Contractors) shall be binding upon the Contractor throughout the pendency
of the Work. The Contractor shall be responsible for compliance with any such law, ordinance, rule or
regulation, and shall hold the County harmless and indemnify same in the event of non- compliance as set
forth in the Contract.
The Contractor certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of South
Carolina Code of Laws (1976, as amended) and agrees to provide to the State upon request any
documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable to the Contractor and
its subcontractors or sub -subcontractors; or (b) that the Contractor and its subcontractors or
subsubcontractors are in compliance with Title 8, Chapter 14.
Pursuant to Section 8- 14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent
document, statement, or report pursuant to this chapter is guilty of a felony and, upon conviction, must be
fined within the discretion of the Court or imprisoned for not more than five years, or both."
The Contractor agrees to include in any contracts with subcontractors, language requiring subcontractors
to (a) comply with applicable requirements of Title 8, Chapter 14, and (b) include in its contracts with the
subcontractors language requiring the sub- subcontractors to comply with the applicable requirements of
Title 8, Chapter 14.
The Contractor agrees to and shall certify agreement to abide by the requirements under Title VI of the
Civil Rights Act of 1964, and other non-discrimination authorities under Federal Executive Order Number
11246, as amended, and specifically the provisions of the equal opportunity clause.
The Contractor shall comply with all federal, state and local laws, ordinances, rules and regulations of any
authorities throughout the duration of this Contract. The Contractor shall be responsible for compliance
with any such law, ordinance, rule or regu lation, and shall hold the County harmless and indemnify same
in the event of non-compliance.
Page 198 of 329
4
SECTION SEVEN
Drug-free Workplace Act
The Contractor shall comply with the South Carolina Drug-free Workplace Act, Section 44-107-10 et seq.,
S.C. Code of Laws (1976, as amended). The County requires all contractors executing contracts for a stated
or estimated value of $50,000 or more to sign a Drug-free Workplace Certification form prior to the issuance
of the Notice to Proceed.
SECTION EIGHT
Contractor's Warranties and Representations
The Contractor represents that its staff is knowledgeable about and experienced in performing the Work
required in this Contract and warrants that it will use best skill and attention to provide above described
Work in a professional, timely manner.
The Contractor warrants and represents that it shall be responsible for all subcontractors working directly
for it, as well as for their work product, as though the Contractor had performed the Work itself.
1. If equipment, materials and supplies are to be a part of the service provided, all equipment,
materials, and supplies incorporated in the Work covered by the bid and provided by the
Contractor are to be new and of the most suitable grade for the purpose intended. Unless
otherwise specifically provided in this Contract, reference to any equipment, material, article or
patented process, by trade name, make or catalog number, shall not be construed as limiting
competition. When requested, the Contractor shall furnish to the Purchasing Director, for
approval the name of the manufacturer, the model number, and other identifying data and
information respecting the performance, capacity, nature and rating of the machinery and
mechanical and other equipment which the Contractor contemplates incorporating in the Work.
When required by this Contract or when called for by the Purchasing Director, the Contractor
shall provide full information concerning the material or articles that he contemplates
incorporating in the Work. When so directed, samples shall be submitted for approval at the
Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material and
articles installed or used without the required prior approval of the County shall be at the risk of
subsequent rejection by the County.
2. Any and all manufacturers' warranties on any equipment or materials will be passed on to the
County and copies of said warranties will be furnished by the Contractor to the County upon
completion and final acceptance of the Work.
3. The Purchasing Director may, in writing, require the Contractor to remove from the Work Site
any employee the Purchasing Director deems incompetent, careless or otherwise objectionable.
4. In addition to any manufacturer's warranties, all labor and materials are warranted to be free from
defects for a period of twenty-four (24) months after the date of Final Payment by the County.
Page 199 of 329
5
SECTION NINE
Retention of Records
The Contractor agrees to maintain for three (3) years from the date of Final Payment, or until the end of
any audit or closure of all pending matters under this Contract, whichever is later, all books, documents,
papers, and records pertinent to this Contract. The Contractor agrees to provide to the County, any federal
grantor agency, the Comptroller General of the United States, any state gantor agency, any assignee, or any
of their duly authorized representatives access to such books, documents, papers, a nd records for the
purpose of examining, auditing, and copying them. The Contractor further agrees to include these
provisions in any subcontracts issued in connection with this Contract.
SECTION TEN
State and Local Taxes
Except as otherwise provided, Contract prices shall include all applicable state and local taxes.
The Contractor shall calculate that portion of the Contract that is subject to the six percent (6%) South
Carolina sales and/or use tax, and this amount shall be itemized and shown on all invoices, and shall be
paid to the SCDOR by Contractor. If Contractor is a non- South Carolina Company, the County will
withhold said amount from all invoices and remit payment to the SCDOR, unless the Contractor furnishes
the County with a valid South Carolina Use Tax Registration Certificate Number.
The Contractor shall indemnify and hold harmless the County for any loss, cost, or expense incurred by,
levied upon or billed to the County as a result of the Contractor's failure to pay any tax of any type due in
connection with this Contract.
The Contractor shall ensure that the above sections are included in all subcontracts and sub -subcontracts,
and shall ensure withholding on out of state sub and sub-subcontractors to which withholding is applicable.
SECTION ELEVEN
Independent Contractor
The Contractor is an independent contractor and shall not be deemed the agent or employee of the County
for any purpose whatsoever. Contractor shall not hold himself out as an employee of the County, and shall
have no power or authority to bind or obligate the County in any manner, except the County shall make
payment to the Contractor for work and expenses as herein provided. The Contractor shall obtain and
maintain all licenses and permits required by law for performance of this Contract by him or his employees,
agents, and servants. The Contractor shall be liable for and pay all taxes required by local, state or federal
governments, including but not limited to social security, Workers' Compensation, employment security,
and any other taxes and licenses or insurance premiums required by law. No employee benefits of any kind
shall be paid by the County to or for the benefit of the Contractor or its employees, agents, or servants by
reason of this Contract.
SECTION TWELVE
Other Contracts
The County reserves the right to undertake or award other contracts for additional work/services, and may
elect to complete portions of the Work/Services included in this Contract using its own forces or through
other contracts, and the Contractor shall fully cooperate with such other contractors, County employees and
Page 200 of 329
6
carefully fit its own work/services to such work/services as may be directed by the County. The Contractor
shall not commit or permit any act by its forces or subcontractors which will interfere with the performance
of work/services by any other contractor or by County and or Department employees
SECTION THIRTEEN
Permits and Licenses
The Contractor shall, without additional expense to the County, be responsible for obtaining and
maintaining all necessary licenses and permits required by the State of South Carolina, a municipality or
the County or any other authority having jurisdiction. Prior to execution of a contract, the Contractor may
be required to provide a copy of its current applicable Contractor's License issued by the State of South
Carolina and business license issued by the County. Contractor's (and or any subcontractor's) L icense
Number, Person's Name and Business Name must all be shown on all required licenses.
SECTION FOURTEEN
Safety, Health, and Security Precautions
The Contractor shall take proper safety, health and security precautions to protect its workers and the
County's property, workers and the public at all times during the term of this Contract. All materials shall
be stored securely, protected from theft or damage.
SECTION FIFTEEN
Inspection and Acceptance
All Work shall be subject to inspection and test by the County at all reasonable times and places. The
Contractor shall, without charge, correct any workmanship found by the County not to conform to the
Contract requirements.
SECTION SIXTEEN
Conditions Affecting the Work
The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and
location of the Work, and the general and local conditions that can affect the Work or the cost thereof. Any
failure by the Contractor to do so will not relieve the Contractor from responsibility for successfully
performing the Work without additional expense to the County. The County assumes no responsibility for
any understanding or representations concerning conditions made by any of its officers o r agents prior to
the execution of this Contract, unless such understandings or representations by the County are expressly
stated in this Contract.
SECTION SEVENTEEN
Cleanup Work: Repair of Damages
During the performance of the Work, the Contractor shall continuously keep County-provided work space
(the "Work Site") and areas adjacent thereto in an orderly condition, free and clear from debris and
discarded materials.
Contractor will restore or replace, when and as directed by the County, any public or private property
damaged or destroyed by Contractor's work, equipment or employees to a condition at least equal to that
existing immediately prior to the beginning of the Work.
Page 201 of 329
7
SECTION EIGHTEEN
Damages
The Contractor expressly agrees that if the Work, or any part thereof, is not performed or completed in a
timely or professional manner in accordance with this Contract or any amendment thereto, the Contractor
and its sureties shall be liable to the County for actual damages that relate to the Contractor's failure to
perform or complete the Work in the manner described above. If actual damages are agreed to by the County
and the Contractor or awarded by the Court, the County shall have the right to deduct f rom and retain out
of monies, which may be then due or which may become due and payable to the Contractor, the amount of
such actual damages; and if the amount so retained by the County is not sufficient to pay in full such actual
damages, the Contractor and/or its sureties shall pay to the County the amount necessary to effect payment
in full of such actual damages.
SECTION NINETEEN
Suspension of Work
The Purchasing Director may order, in writing, the Contractor to suspend, delay, or interrupt all or any part
of the Work for such period of time as he may determine to be appropriate for the convenience of the
County. The County may suspend performance of its obligations under this Contract in good faith for the
convenience of the County or to investigate matters arising in the Work.
The Purchasing Director may order suspension of the Work in whole or in part for such time as he deems
necessary because of the failure of the Contractor to comply with any of the requirements of this Contract,
and the Contract's completion date shall not be extended on account of any such suspension of Work.
When the Purchasing Director orders any suspension of the Work under the paragraph above, the Contractor
shall not be entitled to any payment for Work with respect to the period during which such Work is
suspended and shall not be entitled to any costs or damages resulting from such suspension.
The rights and remedies of the County provided in this Section are in addition to any other rights and
remedies provided by law or under this Contract.
SECTION TWENTY
Modification of Contract
The County's Purchasing Director has the unilateral right to modify this Contract, within the general scope
of work described above and in Exhibit B, when the modification is in the best interest of the County,
provided however, the Contractor is given wri tten notice of any such modification and the County is
responsible for paying Contractor for any additional expenses incurred by the Contractor that relate to the
modification. Subject to the above, the Contractor shall immediately notify the County in wri ting of any
proposed adjustment in its fee and the schedule for performance. The Contractor is obligated to perform
the revised contract when so directed by the Purchasing Director, and the County is obligated to pay for the
work performed pursuant to the modification. No claim by the Contractor for an adjustment hereunder shall
be allowed if asserted after Final Payment under this Contract.
Page 202 of 329
8
SECTION TWENTY-ONE
Termination
1. For Convenience
The Purchasing Director, by advance written notice, may terminate this Contract when it is in the
best interests of the County. If this Contract is so terminated, the Contractor shall be compensated
for all necessary and reasonable direct costs of performing the Work actually accomplished. The
Contractor will not be compensated for any other costs in connection with a termination for
convenience. The Contractor will not be entitled to recover any damages in connection with a
termination for convenience.
2. For Default
If the Contractor refuses or fails to perform the Work or any separable part thereof in a timely or
workmanlike manner in accordance with the Contract Documents, or otherwise fails, in the sole
opinion of the County, to comply with any of the terms and conditions of the Contract Documents
deemed, in the sole opinion of the County, to be material (including, without limitation, the
requirement that Contractor obtain and maintain in force all necessary permits), such refusal or
failure shall be deemed a default under this Contract.
In the event of a default under this Section, the County shall have the right to inform the
Contractor of the default and demand that the Contractor immediately deliver a plan to remedy
the default. If the Contractor does not respond with a timely or reasonably achievable plan, the
County may terminate forthwith this Contract by additional written notice to the Contractor. In
the event of such default, the advance notice period for termination is waived and the Contractor
shall not be entitled to any costs or damages resulting from a termination under this Section.
Whether or not the Contractor's right to proceed with the Work is terminated, it and its sureties
shall be liable for any damage to the County resulting from the Contractor’s default. Any
wrongful termination for default shall be deemed by the Parties a termination for convenience.
3. Termination for Non-Appropriation of Funds
The Purchasing Director, by written advance notice, may terminate this Contract in whole or in
part in the event that sufficient appropriation of funds from any source (whether a federal, state,
County or other source) are not made or sufficient funds are otherwise unavailable, in either case,
to pay the charges under this Contract. If this Contract is so terminated, the Contractor shall be
compensated for all necessary and reasonable direct costs of performing the Work actually
provided to the date of such termination. The Contractor will not be compensated for any other
costs in connection with a termination for non-appropriation. The Contractor will not be entitled
to recover any damages in connection with a termination for non-appropriation, including, but not
limited to, lost profits.
4. Rights Cumulative
The rights and remedies of the County provided in this Section are in addition to any other rights
and remedies provided by law or under this Contract.
Page 203 of 329
9
SECTION TWENTY-TW0
Indemnification
Except for expenses or liabilities arising from the negligence or intentional acts of the County, the
Contractor hereby expressly agrees to indemnify and hold the County harmless against any and all expenses
and liabilities arising out of the negligent or intentionally wrongful performance, action or inaction of the
Contractor in conduct of this Contract, as follows:
For matters other than those arising from the rendering or failure to render professional services, the
Contractor expressly agrees to the extent that there is a causal relationship between its negligence, action
or inaction, or the negligence, action or inaction of any of its employees or any person, firm or corporation
directly or indirectly employed by the Contractor and any damage, liability, injury, loss or expense (whether
in connection with bodily injury or death or property damage) that is suffered by the County and/or its
officers or employees or by any member of the public, to indemnify and save the County and its officers
and employees harmless against any and all liabilities, penalties, demands, claims, lawsuits, losses,
damages, costs, and expenses arising out of the negligence, action or inaction of the Contractor, regardless
of whether such liabilities, penalties, demands, claims, lawsuits, losses, damages, costs and expenses are
caused in part by the County. Such costs are to include, without limitation, defense, settlement and
reasonable attorney's fees incurred by the County and its employees. This promise to indemnify shall
include, without limitation, bodily injuries or death occurring to the Contractor's employees and any person,
directly or indirectly employed by the Contractor (including, without limitation, any employee of any
subcontractor), the County's officers or employees, the employees of any other independent contractors, or
occurring to any member of the public. When the County s ubmits notice, the Contractor shall promptly
defend any aforementioned action.
For matters arising out of the rendering or failure to render professional services, the Contractor will
indemnify and save the County and its officers and employees harmless from and against all liabilities,
penalties, demands, claims, lawsuits, losses, d amages, costs and expenses arising out of or resultant from
any negligent act, error or omission of the Contractor in the rendering or failure to render professional
services under this Contract. Such costs are to include, without limitation, defense, sett lement and
reasonable attorneys' fees incurred by the County and its officers and employees. This promise to indemnify
shall include, without limitation, bodily injuries or death occurring to the Contractor's employees and any
person, directly or indirectly employed by the Contractor (including, without limitation, any employee of
any subcontractor), the County's officers or employees, the employees of any other independent contractors,
or occurring to any member of the public. When the County submits notic e of a claim that triggers the
indemnity, the Contractor shall promptly defend any aforementioned action.
The limits of insurance required in this Contract shall not limit the Contractor's obligations under this
Section. The terms and conditions contained in this Section shall survive the termination of the Contract or
the suspension of the Work hereunder. To the extent that any liabilities, penalties, demands, claims,
lawsuits, losses, damages, costs and expenses are caused in part by the acts of the County, the Contractor’s
obligations shall be reduced in proportion to the County's fault. The obligations herein shall also extend to
any actions by the County to enforce this indemnity obligation. The recovery of costs and fees all extend
to those incurred in the enforcement of this indemnity.
Page 204 of 329
10
SECTION TWENTY-THREE
Gratuities and Kickbacks
Gratuities. It shall be unethical for any person to offer, give or agree to give any employee or former
employee, or for any employee or former employee to solicit, demand, accept, or agree to accept from
another person a gratuity or an offer of employment in connection with any decision, approval, disapproval,
recommendation, preparation or any part of a program requirement or a purchase request, influencing the
content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any
other advisory capacity in any proceeding or application, request for ruling, determination, claim or
controversy, or other particular matter pertaining to any program requirement of a contract or subcontract,
or to any solicitation or proposal therefore.
Kickbacks. It shall be unethical for any payment, gratuity, or offer of employment to be made by or on
behalf of a subcontractor under a contract to the prime contractor, or to hire any subcontractor or any person
associated therewith, as an inducement for the award of a subcontract or order.
Violation of this clause may result in Contract termination.
SECTION TWENTY-FOUR
Labor: Subcontractors
No subcontracts shall be allowed without the prior written approval of the County. The Contractor shall not
contract with a proposed person or entity to whom the County has made reasonable and timely objections.
The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable
and timely objection.
The Contractor shall enforce strict discipline and good order among its employees and other persons
carrying out the performance of the Contract.
Employment of labor by the Contractor shall be effected under conditions which are satisfactory to the
County. The Contractor shall remove or cause to have removed from the project any employee or employees
who are considered unsatisfactory by the County.
The Contractor assumes the responsibility for assuring that its working forces are compatible with the
County employees and the Contractor is responsible for making itself aware of those forces. The Contractor
will furnish a competent representative who is to be kept available to represent the Contractor for the
purpose of receiving notices, orders and instruction. No substitutions shall be made of such Contractor’s
representative without the approval of the County and a replacement by someone with comparable, skills,
experience and talent.
SECTION TWENTY-FIVE
Assignment
The Contractor shall not assign in whole or in part the Contract without the prior written consent of the
County or its Assignee. The Contractor shall not assign any money due or that may become due to it under
said the Contract without the prior written c onsent of the County or its Assignee. Each Party binds itself,
its successors, assigns, executors, administrators or other representatives to the other Party hereto and to
successors, assigns, executors, administrators or other representatives of such other Party in connection
with all terms and conditions of the Contract.
Page 205 of 329
11
SECTION TWENTY-SIX
Controlling Law
The laws of South Carolina shall govern this Contract. All litigation arising under this Contract shall be
litigated only in a nonjury hearing in the Court of Common Pleas, Fourteenth Judicial Circuit, Beaufort
County, South Carolina.
SECTION TWENTY-SEVEN
Entire Contract
This Contract constitutes the entire understanding and contract between the Parties hereto and supersedes
all prior and contemporaneous written and oral contracts between the Parties and their predecessors in
interest regarding the subject matter of this Contract. This Contract may not be changed, altered, amended,
modified, or terminated orally, except as specifically provided, and any such change, alteration,
amendment, or modification must be in writing and executed by the Parties hereto.
SECTION TWENTY-EIGHT
Severance
Should any part of this Contract be determined by a Court of competent jurisdiction to be invalid, illegal,
or against public policy, said offending Section shall be void and of no effect and shall not render any other
Section herein, nor this Contract as a whole, invalid. Any terms which, by their nature, should survive the
suspension, termination or expiration hereof shall be deemed to so survive.
SECTION TWENTY-NINE
Non-waiver
Any waiver of any default by either Party to this Contract shall not constitute waiver of any subsequent
default, nor shall it operate to require either Party to waive, or entitle either Party to a waiver of, any
subsequent default hereunder.
Page 206 of 329
Page 207 of 329
Alljoy Road Sidewalk
Line Item Description
1 1031000 MOBILIZATION (8%)
2 1032010 BONDS AND INSURANCE (2%)
3 1050800 CONSTRUCTION STAKES, LINES & GRADES (3%)
4 1052110 LARGE PUBLIC WATER RELOCATION NO. 1
5 2012000 CLEARING & GRUBBING WITHIN ROADWAY
6
2023000 REMOVAL & DISPOSAL OF EXISTING
PAVEMENT
7 2024100 REMOVAL & DISPOSAL OF EXISTING CURB
8
2025000 REMOVAL & DISPOSAL OF EXISTING ASPHALT
PAVEMENT
9 2031000 UNCLASSIFIED EXCAVATION
10 2033000 BORROW EXCAVATION
11 2034000 MUCK EXCAVATION
12 2103000 FLOWABLE FILL
13 3059900 MAINTENANCE STONE
14 4011004 LIQUID ASPHALT BINDER PG64-22
15
4040350 ASPHALT SURFACE COURSE TYPE D (Driveways
etc)
16 6011000 TRAFFIC CONTROL (10%)
17 6051120 PERM CONSTR SIGNS (GROUND MOUNTED)
19
6271015 8" WHITE SOLID LINES THERMOPLASTIC - 125
MIL.
20
6271025 24" WH SO LINES (STOP/DIAG LINES)-THERMO.-
125 MIL.
21
6271074 4" YEL SOLID LINES (PVT. EDGE LINES)
THERMO.-90 MIL.
22 6301100 PERM YEL PAVEMENT MARKERS BI-DIR.- 4"X4"
23 6319505 REMOVAL OF PAVEMENT MARKINGS
24 6510105 FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN
Page 208 of 329
25 6531210 U-SECTION POST FOR SIGN SUPPORTS - 3P
26 7143615 15" SMOOTH WALL PIPE
27 7143618 18" SMOOTH WALL PIPE
28 7143624 24" SMOOTH WALL PIPE
29 7143630 30" SMOOTH WALL PIPE
30 7149999 CLEANING EXISTING PIPE
31 7191250 CATCH BASIN -TYPE 9 MH
32 7197052 CONCRETE COLLAR FOR UP TO 24" PIPE
33 7197053 CONCRETE COLLAR FOR UP TO 36" PIPE
34 7204100 CONCRETE SIDEWALK(4" UNIFORM)
35 7204900 DETECTABLE WARNING MATERIAL
36 7205000 CONCRETE DRIVEWAY(6" UNIFORM)
37 7209000 PEDESTRIAN RAMP CONSTRUCTION
38 8041020 RIP-RAP (CLASS B)
39
8048205 GEOTEXTILE FOR E/C UNDER RIPRAP(CLASS
2)TYPE B
40 8068301 TEMPORARY BARRIER FENCE (ORANGE)
41 8100100 PERMANENT COVER
42 8100200 TEMPORARY COVER
43 8104005 FERTILIZER (NITROGEN)
44 8104010 FERTILIZER (PHOSPHORIC ACID)
45 8104015 FERTILIZER (POTASH)
46 8105005 AGRICULTURAL GRANULAR LIME
47 8109050 SELECTIVE WATERING
48 8109901 MOWING
49
8151102 TURF REINFORCEMENT MATTING (TRM) TYPE
2
50
8151203 HYDRAULIC EROS CONTRl PRODUCT (HECP) -
TYPE 3
51 8152004 INLET STRUCTURE FILTER - TYPE F (WEIGHTED)
52 8152007 SEDIMENT TUBES FOR DITCH CHECKS
53 8153000 SILT FENCE
54 8153090 REPLACE/REPAIR SILT FENCE
55 8154050 REMOVAL OF SILT RETAINED BY SILT FENCE
Page 209 of 329
56
8156222 PREFABRICATED INTERIOR INLET FILTER
SYSTEM FOR CB T-9
Total
Page 210 of 329
Sandhill ALS Construction, Inc.
Quantity Unit of Measure Unit Cost
1 LS $30,000.00
1 LS $40,000.00
1 EA $35,000.00
1 EA $365,000.00
1 LS $50,000.00
48 SY $25.00
25 LF $10.00
34 SY $25.00
3577 CY $20.00
3956 CY $20.00
200 CY $35.00
9 CY $500.00
752 TON $100.00
39 TON $650.00
649 TON $350.00
1 LS $75,000.00
728 SF $10.00
491 LF $35.00
114 LF $50.00
20 LF $25.00
3 EA $2,500.00
68 LF $45.00
33 SF $30.00
Alljoy Road Sidewalk
Page 211 of 329
56 LF $20.00
264 LF $105.00
1432 LF $150.00
1376 LF $200.00
8 LF $300.00
284 LF $30.00
22 EA $6,000.00
3 EA $1,000.00
1 EA $2,000.00
4221 SY $105.00
200 SF $65.00
54 SY $93.00
400 SY $150.00
53 TON $250.00
66 SY $10.00
2465 LF $20.00
2.07 ACRE $6,000.00
2.07 ACRE $6,000.00
207 LB $10.00
207 LB $10.00
207 LB $10.00
4133 LB $3.00
54300 GAL $.25
8.27 ACRE $2,000.00
0.08 MSY $3,000.00
2.07 ACRE $5,000.00
320 LF $15.00
540 LF $20.00
3468 LF $5.00
347 LF $4.00
867 LF $4.00
Page 212 of 329
20 EA $300.00
Page 213 of 329
Site-Prep Inc of NC
Total Unit Cost
$30,000.00 $199,300.00
$40,000.00 $52,100.00
$35,000.00 $41,250.00
$365,000.00 $665,786.00
$50,000.00 $86,075.00
$1,200.00 $69.50
$250.00 $104.50
$850.00 $87.50
$71,540.00 $41.50
$79,120.00 $72.00
$7,000.00 $61.75
$4,500.00 $306.00
$75,200.00 $40.00
$25,350.00 $770.00
$227,150.00 $207.60
$75,000.00 $312,000.00
$7,280.00 $22.00
$17,185.00 $11.00
$5,700.00 $27.50
$500.00 $3.30
$7,500.00 $22.00
$3,060.00 $2.25
$990.00 $27.50
Sandhill ALS Construction, Inc.
Page 214 of 329
$1,120.00 $15.00
$27,720.00 $332.00
$214,800.00 $272.00
$275,200.00 $286.00
$2,400.00 $702.00
$8,520.00 $20.00
$132,000.00 $5,670.00
$3,000.00 $4,335.00
$2,000.00 $5,792.00
$443,205.00 $77.00
$13,000.00 $66.00
$5,022.00 $104.50
$60,000.00 $198.00
$13,250.00 $243.00
$660.00 $18.00
$49,300.00 $4.40
$12,420.00 $1,925.00
$12,420.00 $1,375.00
$2,070.00 $2.25
$2,070.00 $2.25
$2,070.00 $2.25
$12,399.00 $1.10
$13,575.00 $.02
$16,540.00 $550.00
$240.00 $8,250.00
$10,350.00 $3,575.00
$4,800.00 $11.00
$10,800.00 $11.00
$17,340.00 $3.85
$1,388.00 $4.40
$3,468.00 $2.20
Page 215 of 329
$6,000.00 $500.00
$2,508,522.00
Page 216 of 329
Total
$199,300.00
$52,100.00
$41,250.00
$665,786.00
$86,075.00
$3,336.00
$2,612.50
$2,975.00
$148,445.50
$284,832.00
$12,350.00
$2,754.00
$30,080.00
$30,030.00
$134,732.40
$312,000.00
$16,016.00
$5,401.00
$3,135.00
$66.00
$66.00
$153.00
$907.50
Site-Prep Inc of NC
Page 217 of 329
$840.00
$87,648.00
$389,504.00
$393,536.00
$5,616.00
$5,680.00
$124,740.00
$13,005.00
$5,792.00
$325,017.00
$13,200.00
$5,643.00
$79,200.00
$12,879.00
$1,188.00
$10,846.00
$3,984.75
$2,846.25
$465.75
$465.75
$465.75
$4,546.30
$1,086.00
$4,548.50
$660.00
$7,400.25
$3,520.00
$5,940.00
$13,351.80
$1,526.80
$1,907.40
Page 218 of 329
$10,000.00
$3,571,452.20
Page 219 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION FOR APPROVAL OF AN INTERGOVERNMENTAL AGREEMENT BETWEEN BEAUFORT
COUNTY AND THE TOWN OF PORT ROYAL, TOWN OF BLUFFTON, TOWN OF HILTON HEAD ISLAND AND THE
CITY OF BEAUFORT FOR PARTICIPATION IN THE PAVEMENT EVALUATION AND MAINTENANCE PLAN PROJECT.
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of an Intergovernmental Agreement between Beaufort County and the Town of
Port Royal, Town of Bluffton, Town of Hilton Head Island and the City of Beaufort for participation in the
Pavement Evaluation and Maintenance Plan project.
PRESENTER INFORMATION:
Bryan Bauer, P.E., Director of Engineering (5 Min)
ITEM BACKGROUND:
The county performs a periodic evaluation of the condition of our county-owned paved roads. In coordination
with our project, we have reached out to the municipalities within Beaufort County to offer them the
opportunity to evaluate their roads as an add-on to our contract. This IGA provides the arrangement and costs
for each municipality to participate in our overall project.
FISCAL IMPACT:
The county has a contract with the vendor to evaluate our county-owned paved roads. Each municipality will
provide funding based on the number of road miles they have requested surveyed. The total amount of
contributions to the project total $26,060.00.
Hilton Head $10,830.13
Port Royal $1,353.77
Bluffton $5,076.62
City of Beaufort $8,799.48
Total $26,060.00
APPROVAL HISTORY:
The County is contracting with Infrastructure Consulting & Engineering for pavement condition surveys of the
Beaufort County pavement network. Recommendation for approval of the contract is being presented
separately.
Page 220 of 329
Page 1 of 3
INTERGOVERNMENTAL AGREEMENT BETWEEN BEAUFORT
COUNTY, CITY OF BEAUFORT, TOWN OF PORT ROYAL, TOWN OF
BLUFFTON AND TOWN OF HILTON HEAD ISLAND FOR PAVEMENT
EVALUATION
THIS INTERGOVERNMENTAL AGREEMENT (“IGA”) by and between Beaufort
County, City of Beaufort, Town of Port Royal, Town of Bluffton and Town of Hilton Head Island
is made and entered into this ___ day of __________ 2025.
WHEREAS, Beaufort County is contracting with Infrastructure Consulting & Engineering
(ICE) for Pavement Evaluation on all Beaufort County roads, and
WHEREAS, the City of Beaufort, the Town of Port Royal, the Town of Bluffton and the
Town of Hilton Head Island desire to have pavement evaluations completed on some portion of
their roads, and
WHEREAS, the cost for the pavement evaluation will be reduced for all parties by
combining them into one contract, and
WHEREAS, Beaufort County is contracting with ICE for a total contract amount of
$322,995.00, and
WHEREAS, each municipality has agreed to pay a portion of the Contract fee for the
evaluation of their roads, and
WHEREAS, in the event of any project overruns based on the number of miles evaluated
each municipality will be financially responsible for roads they own, and
NOW, THEREFORE, for and in consideration of the mutual covenants exchanged herein, the
City, Towns and the County hereby agree as follows:
1. The Contract will be funded by each party as follows:
$296,935.00 - Beaufort County
$ 8,799.48 - City of Beaufort
$ 1,353.77 - Town of Port Royal
$ 5,076.62 - Town of Bluffton
$ 10,830.13 - Town of Hilton Head Island
$322,995.00
2. Beaufort County shall assume responsibility for the planning, award, administration, and
management of all documents concerning, relating and pertaining to the Contract.
3. In the interest of continuity, timely response to issues which arise and fiscal control over the
Project, Beaufort County will be responsible for day to day oversight of the Contract.
Page 221 of 329
Page 2 of 3
4. The municipalities have each confirmed a list of the roads to be evaluated.
5. The municipalities have agreed to the scope of the Pavement Evaluation Contract.
6. Beaufort County shall deduct ten (10%) percent from the construction contractor payment
as retainage. Retainage may, in Beaufort County’s sole discretion, be reduced to five (5%)
percent upon fifty (50%) percent completion of the Project. All retainage will be paid upon
satisfactory completion of the Project as required by the Contract Documents.
7. Any notice under this Agreement shall be delivered in writing to the following:
To the County of Beaufort: Mr. Michael Moore
County Administrator
P. O. Drawer 1228
Beaufort, SC 29901-1228
To the City of Beaufort: Mr. Scott Marshall
City Manager
1911 Boundary St
Beaufort, SC 29902
To the Town of Port Royal Mr. Van Willis
Town Manager
P.O. Drawer 9
Port Royal, SC 29935
To the Town of Bluffton Mr. Stephen Steese
Town Manager
P.O. Box 386
Bluffton, SC 29910
To the Town of Hilton Head Isl. Mr. Marc Orlando
Town Manager
1 Town Center Ct
Hilton Head Island, SC 29928
8. All parties agree that procurement of goods or services in the furtherance of the Contract
shall be pursuant to Beaufort County procurement policies, ordinances and/or guidelines as
well as any relevant state or federal procurement requirements which may be applicable if
state and/or federal grant funding is received. The parties expressly agree to be bound by
the County’s interpretation of the same.
9. This Agreement constitutes the full and complete agreement between the parties relative to
the Contract. None of the parties rely upon, or has the right to rely upon, any representation
regarding the terms of this Agreement regardless of whether such representations are oral
Page 222 of 329
Page 3 of 3
or written, consistent or inconsistent with the terms set forth herein. This Agreement
supersedes and replaces all previous Agreement discussion between the parties relating to
the Contract. To the extent any term or condition of this Agreement contradicts a term or
condition in a previous Agreement or discussion, the terms and conditions set forth herein
shall prevail.
10. This Agreement cannot be amended except in writing and with the mutual consent of all
parties.
IN WITNESS WHEREOF, we have hereunto set our hands and seals the day and year first above
written.
WITNESSES:
_____________________________________ By: _________________________________
Michael Moore, Beaufort County
County Administrator
_____________________________________
_____________________________________ By: _________________________________
Scott Marshall, City of Beaufort City
Manager
_____________________ ____________ _
_________________________ __________ By: _______________________________
Van Willis, Port Royal Town Manager
____________________________________
_____________________________________ By: ________________________________
Stephen Steese, Bluffton Town Manager
_____________________________________
_____________________________________ By: ________________________________
Marc Orlando, Hilton Head Island
Town Manager
_____________________________________
Page 223 of 329
Roadway Length (LF)
Battery Green Court 211
Bladen Ln 317
Bowling Ln 686
Bray St 317
Broad St 2,534
Candleberry Ln 528
Capers St 686
Coleman Ln 634
Crofut Ln (alleyway) 317
Dutchess Ln (mid-twn) 264
Elliot St 1,742
Elton Ln 317
Firehouse Ln 370
Fuller St 634
Hanover Ln 581
Lady Ln (mid-twn) 158
Old Commons Ln (alywy) 264
Old Trail Rd 1,056
Phillips St 634
Polk St 2,165
Princess Ln (Mid-twn) 106
Reynolds St 739
Rhett St (dirt) 1,373
Von Harten St (dirt) 317
Waters Edge Court East 634
Waters Edge Court West 739
Acorn Hill Ave 898
Burton Hill Rd 1,795
Calhoun St 1,848
Charles St 898
Church St 317
Church St 53
Lovejoy St 1,056
Lovejoy Way 317
Morris St 634
Newcastle St 317
North St 264
Exhibit D
City of Beaufort
Page 224 of 329
Old Salem Rd 528
Palmetto Dr 370
Palmetto St 634
Prince St 528
Rodgers Dr 1,320
Simms St 1,109
Sytcamore St 370
Union St 634
Washington St 264
Westbiew Ave 264
Otter Circlde 6,864
Ferrets End 845
Wolverine Dr 1,056
Mustelidae Rd 1,214
Pine Martin Rd 1,373
Beavers Den 264
Stone Marten Circle 264
Stone Marten Drive 1,267
Anchorage Way 1,056
Battery Chase 845
De La Gaye Point 4,330
Fiveoaks Cir 792
Islands Ave 3,907
Island Cir 211
Palmetto Place 845
Plough Place 370
Sunset Court 317
Brighton Ln 211
Cottage Farm Dr 5,386
Dover Ln 158
Glendale Ln (north) 106
Glendale Ln (south) 317
McChesney Ln 211
Stafford Ln 317
Joshua Circle 950
Joshua Court 686
Craven St 53
New St 264
Port Republic St 106
67,320 LF
12.75 Miles
Please add Heyward St - between Prince St and North St. 590 LF
Page 225 of 329
Street Name Section Length (ft) Pavement Condition
Index (PCI) Street Name Length (ft) Pavement Condition
Index (PCI)
7th Paris to London 561 82 18th 506 72
8th Paris to London 564 57 Old Fort Rd 626 67
9th Madrid to Paris 468 91 Old Shell Ct 476 81
Paris to London 540 100 Tamara Ln 568 65
10th
Madrid to Paris 542 89 Laurel St 544 82
Paris to London 533 53 Ritter Cir 1,417 52
London to DE (E) 240 53 Berkley Cir 665 71
11th
DE (W) to Madrid 469 76 Edinburgh Ave 1,496 62
Madrid to Paris 540 50 Columbia Ave 1,913 64
Paris to London 526 100 Madrid Ave 2,669 57
London to Richmond 545 100 London Ave 2,381 52
12th
Columbia to Madrid 550 63 Richmond Ave 3,368 95
Madrid to Paris 523 61 West Paris Ave 1,640 55
Paris to London 524 38 Pickney Blvd 775 36
London to Richmond 562 35 Stuart Towne Ln 917 88
13th
DE (W) to Columbia 325 63 Old Shell Road 4,760 55
Columbia to Madrid 552 39 Sands Beach Rd 1,758 100
Madrid to Paris 527 33 Paris Avenue 4,212 57
Richmond to DE (E) 370 100
14th
Columbia to Madrid 550 68
Madrid to Paris 520 54
Paris to London 515 62
London to Richmond 555 52
Richmond to Old Shell 380 50
15th
Edinburgh to Columbia 555 80
Columbia to Madrid 556 79 Standard PCI
Rating Scale PrioritizationMadrid to Paris 528 81
Paris to London 525 67 ### Good Beyond 10 YearsLondon to Richmond 541 100
16th
Edinburgh to Columbia 550 75 85 Satisfactory 5-10 yearsColumbia to Madrid 550 68
Madrid to Paris 514 63 70 Fair 3-5 yearsParis to London 542 60
London to Richmond 558 100 55 Poor 1-3 yearsRichmond to Old Shell 938 44
Old Shell to DE (E) 736 100 40 Very Poor
Priority Attention
17th DE (W) to Richmond 233 81
Richmond to DE (E) 465 78 25 Serious*DE - Dead End, (E) or (W) - East or West
*PCI's of 100 indicate recenlty resurfaced roads and were not surveyed 10 Failed
0
Page 226 of 329
Town of Port Royal Roadways - Sorted Pavement Condition
Street Name Section Length (ft) Pavement Condition
Index (PCI)
13th Madrid to Paris 527 33
12th London to Richmond 562 35
12th Paris to London 524 38
12th Paris to London 524 38
13th Columbia to Madrid 552 39
16th Richmond to Old Shell 938 44
11th Madrid to Paris 540 50
14th Richmond to Old Shell 380 50
14th London to Richmond 555 52
Ritter Cir 1,417 52
London Ave 2,381 52
10th Paris to London 533 53
10th London to DE (E) 240 53
14th Madrid to Paris 520 54
West Paris Ave 1,640 55
Old Shell Road 4,760 55
8th Paris to London 564 57
Madrid Ave 2,669 57
Paris Avenue 4,212 57
16th Paris to London 542 60
12th Madrid to Paris 523 61
14th Paris to London 515 62
Edinburgh Ave 1,496 62
12th Columbia to Madrid 550 63
13th DE (W) to Columbia 325 63
16th Madrid to Paris 514 63 Standard PCI Rating Scale
Columbia Ave 800 64
Tamara Ln 568 65 100 100 Good15th Paris to London 525 67 86
Old Fort Rd 626 67 85 85 Satisfactory14th Columbia to Madrid 550 68 71
16th Columbia to Madrid 550 68 70 70 FairBerkley Cir 665 71 56
18th 506 72 55 55 Poor16th Edinburgh to Columbia 550 75 41
11th DE (W) to Madrid 469 76 40 40 Very Poor17th Richmond to DE (E) 465 78 26
15th Columbia to Madrid 556 79 25 25 Serious15th Edinburgh to Columbia 555 80 11
15th Madrid to Paris 528 81 10 10 Failed17th DE (W) to Richmond 233 81 0 0Old Shell Ct 476 81
7th Paris to London 561 82
Laurel St 544 82
Stuart Towne Ln 917 88
10th Madrid to Paris 542 89
9th Madrid to Paris 468 91
Richmond Ave 3,368 95
9th Paris to London 540 100
11th Paris to London 526 100
11th London to Richmond 545 100
13th Richmond to DE (E) 370 100
15th London to Richmond 541 100
16th London to Richmond 558 100
16th Old Shell to DE (E) 736 100
Sands Beach Rd 1,758 100
49099
9.30 Miles
Page 227 of 329
EXHIBIT C
Town of Port Royal Roads
Road Length (ft) Termini Termini
Old Shell Road 4,760 Ribaut 14th
Tamara Ln 568 16th End
Old Fort Rd 626 Old Shell End
Berkley Cir 665 Ribaut Ribaut
Old Shell Ct 476 Old Shell Rd End
Laurel St 544 Columbia Madrid
Stuart Towne Ln 917 Pinckney Blvd End
8,556 LF
1.62 Miles
Page 228 of 329
Street Name Section Length (ft) Pavement Condition
Index (PCI)
Area
(square yards) Total Cost Cumulative
Estimates
13th Madrid to Paris 527 33 1327 $ 34,562
12th London to Richmond 562 35 1405 $ 36,443 Priority
Pickney Blvd 775 36 2223 $ 57,542 Attention
12th Paris to London 524 38 1320 $ 34,049
13th Columbia to Madrid 552 39 1383 $ 35,582 $ 198,179
16th Richmond to Old Shell 938 44 2240 $ 57,080
11th Madrid to Paris 540 50 1356 $ 34,128
14th Richmond to Old Shell 380 50 1000 $ 25,180
14th London to Richmond 555 52 1389 $ 34,824
Ritter Cir 1,417 52 3305 $ 82,839
London Ave 2,381 52 5447 $ 136,535
10th Paris to London 533 53 1340 $ 33,530
10th London to DE (E) 240 53 689 $ 17,243
14th Madrid to Paris 520 54 1312 $ 32,740 1-3 Years
West Paris Ave 1,640 55 4529 $ 112,831
Old Shell Road 4,760 55 12849 $ 320,093 $ 887,024
8th Paris to London 564 57 1409 $ 34,963
Madrid Ave 2,669 57 6087 $ 151,011
Paris Avenue 4,212 57 19628 $ 486,938
16th Paris to London 542 60 1360 $ 33,540
12th Madrid to Paris 523 61 1318 $ 32,432
14th Paris to London 515 62 1300 $ 31,927
Edinburgh Ave 1,496 62 3480 $ 85,449
12th Columbia to Madrid 550 63 1378 $ 33,766
13th DE (W) to Columbia 325 63 878 $ 21,516
16th Madrid to Paris 514 63 1298 $ 31,806
Columbia Ave 1,913 64 4407 $ 107,746
Tamara Ln 568 65 1418 $ 34,600
15th Paris to London 525 67 1323 $ 32,133
Old Fort Rd 626 67 1547 $ 37,585 3-5 Years
14th Columbia to Madrid 550 68 1378 $ 33,411
16th Columbia to Madrid 550 68 1378 $ 33,411 $ 1,222,236
Berkley Cir 665 71 1634 $ 39,355
18th 506 72 1280 $ 30,778
16th Edinburgh to Columbia 550 75 1378 $ 32,915
11th DE (W) to Madrid 469 76 1198 $ 28,555
17th Richmond to DE (E) 465 78 1189 $ 28,220
15th Columbia to Madrid 556 79 1392 $ 32,947
15th Edinburgh to Columbia 555 80 1389 $ 32,823
15th Madrid to Paris 528 81 1329 $ 31,337
17th DE (W) to Richmond 233 81 674 $ 15,883
Old Shell Ct 476 81 1214 $ 28,613 5-10 Years
7th Paris to London 561 82 1403 $ 32,994
Laurel St 544 82 1365 $ 32,105 $ 366,524
Stuart Towne Ln 917 88 2194 $ 33,861
10th Madrid to Paris 542 89 1360 $ 20,998
9th Madrid to Paris 468 91 1196 $ 18,460
Richmond Ave 3,368 95 8389 $ 129,483
9th Paris to London 540 100 1356 $ 20,930
11th Paris to London 526 100 1325 $ 20,450
11th London to Richmond 545 100 1367 $ 21,101
13th Richmond to DE (E) 370 100 978 $ 15,099
15th London to Richmond 541 100 1358 $ 20,964 Beyond
16th London to Richmond 558 100 1396 $ 21,547 10 Years
16th Old Shell to DE (E) 736 100 1792 $ 27,653
Sands Beach Rd 1,758 100 4844 $ 74,767 $ 425,313
*Paris Avenue area estimate includes street parking surfaces
*Areas include intersection estimates
*Estimated 10% Surface Patching and 5% Misc.
Page 229 of 329
ROAD NAME SURFACE LENGTH
(FT) R/W WIDTH TERMINI TERMINI
1 ADRIANNA LANE PAVED 315 50* US 278 DEAD END
2 ALEX PATTERSON ROAD PAVED 1564 50 MARSHLAND ROAD DEAD END
3 ARROW ROAD PAVED 4037 60 ARCHER ROAD HELMSMAN'S WAY
4 AUTOMOBILE PLACE PAVED 708 66 US 278 DEAD END
5 BAYBERRY LANE PAVED 172 20 SOUTH FOREST BEACH DRIVE DEAD END
5A BAYBERRY LANE PAVED 362 50 SOUTH FOREST BEACH DRIVE DEAD END
6 BLAZING STAR LANE PAVED 600 VARIES SQUIRE POPE ROAD DEAD END
7 BOBWHITE LANE PAVED 544 50 KING BIRD DRIVE DEAD END
8 C. HEINRICHS CIRCLE PAVED 1075 NONE / THHI LAND US 278 DEAD END
9 CASSINA LANE PAVED 602 50 / 20 SOUTH FOREST BEACH DRIVE BAYBERRY LANE
10 CASTNET DRIVE PAVED 2736 NONE / THHI LAND BURKES BEACH DRIVE SINGLETON BEACH ROAD
11 CENTRAL AVENUE PAVED 465 70/50 WILLIAM HILTON PKWY MAIN STREET
12 CHAMBERLIN DRIVE PAVED 685 75 US 278 DEAD END
13 COOPERATIVE WAY PAVED 363 50 MATHEWS DRIVE ELECTRIC AVENUE
14 DOGWOOD LANE PAVED 315 50 SOUTH FOREST BEACH DRIVE SEA OAK LANE
15 DOVE STREET (NFB 1A) PAVED 706 50 NORTH FOREST BEACH DRIVE LAGOON ROAD
16 DUNE LANE (NFB SUBDIV 2) PAVED 2230 20 PSDE** DUNE AND JACANA SANDPIPER STREET
17 DUNNAGANS ALLEY PAVED 3760 50 ARROW ROAD WEXFORD DRIVE
18 EGRET STREET (NFB 1A) PAVED 790 50 NORTH FOREST BEACH DRIVE LAGOON ROAD
19 ELDERBERRY LANE PAVED 318 50 SOUTH FOREST BEACH DRIVE SEA OAK LANE
20 ELECTRIC AVENUE PAVED 1048 50 OAK PARK DRIVE POWER ALLEY
21 EXCHANGE STREET PAVED 361 50 US 278 MAIN STREET
22 FLAMINGO ROAD PAVED 494 50 PARK ROAD LAGOON ROAD
23 FIRETHORN LANE PAVED 1838 50 SOUTH FOREST BEACH DRIVE SEA OAK LANE
24 FISH HAUL CREEK PARK COMMON PAVED 1116 35 BEACH CITY ROAD DEAD END
25 FRESH MARKET/HARGRAY DRIVEWAYS PAVED 680 50 / 40 US 278 QUEENS WAY
26 GANNET STREET PAVED 540 50 PARK ROAD LAGOON ROAD
27 HABITAT CIRCLE PAVED 633 50 ALEX PATTERSON DRIVE DEAD END
28 HAIG POINT CIRCLE PAVED 2181 66 HELMSMAN'S WAY DEAD END
29 HARGRAY/FRSH MRKT DRVWY PAVED 1091 50 US 278 DEAD END (FRESH MARKET)
30 HERON STREET PAVED 815 50 NORTH FOREST BEACH DRIVE LAGOON ROAD
31 HICKORY LANE PAVED 738 50 SOUTH FOREST BEACH DRIVE DEAD END
32 HONEY HORN DRIVE PAVED 2557 NONE / THHI LAND US 278 DEAD END
33 HOSPITAL CENTER BOULEVARD PAVED 2090 110 BAECH CITY ROAD LAMOTTE DRIVE
34 HUMANE WAY PAVED 551 40 SPANISH WELLS ROAD DEAD END
35 INDIGO RUN DRIVE PAVED 3712 150 US 278 PEMBROKE DRIVE
36 JARVIS PARK ROAD PAVED 1600 50 NATURES WAY DEAD END
37 JUNIPER LANE PAVED 507 50 SOUTH FOREST BEACH DRIVE DEAD END
38 KATIE MILLER ROAD PAVED 545 60 GUMTREE ROAD CEASAR PLACE
39 KINGBIRD LANE PAVED 1069 60 SONG SPARROW LANE DEAD END
40 KINGFISHER STREET (NFB SUBDIV 2) PAVED 333 36 PSDE** NORTH FOREST BEACH DRIVE DUNE LANE
41 KIRBY LANE UNPAVED 344 NONE/ESMT CHAMBERLIN DRIVE DEAD END
42 LARK STREET (NFB SUBDIV 2) PAVED 360 36 PSDE** NORTH FOREST BEACH DRIVE DUNE LANE
43 LAUREL LANE PAVED 538 50 SOUTH FOREST BEACH DRIVE DEAD END
44 LEMOYNE AVENUE PAVED 1772 100 SOUTH FOREST BEACH DRIVE DEAD END
45 LAGOOD ROAD EXTENSION PAVED 927 88 POPE AVENUE DEAD END
46 MAC DONOUGH LANE PAVED 242 50 GUMTREE ROAD DEAD END
47 MAIN STREET (East or North segment) PAVED 3028 50 WHOOPING CRANE WAY HOSPITAL CENTER BLVD
48 MAIN STREET (West segment) PAVED 3720 50 WHOOPING CRANE WAY WILBORN RD
49 MALLARD STREET (NFB SUBDIV 2) PAVED 1301 50 NORTH FOREST BEACH DRIVE DEAD END (LAND SIDE)
50 MALLARD STREET PAVED 362 50 / 30 NORTH FOREST BEACH DRIVE DUNE LANE
51 MEETING STREET PAVED 900 50 MAIN STREET DEAD END
52 MERCHANT STREET PAVED 850 VARIES WILLIAM HILTON PKWY MAIN STREET
53 MINGO WAY PAVED 262 50 MATHEWS DRIVE ELECTRIC AVENUE
54 MUSEUM STREET PAVED 430 45 WILLIAM HILTON PKWY MAIN STREET
55 MYRTLE LANE PAVED 719 50 SOUTH FOREST BEACH DRIVE DEAD END
56 NASSAU STREET PAVED 1727 50 POPE AVENUE DEALLYON AVENUE
57 NATURES WAY PAVED 1186 50 AUGUSTA LANE US 278
58 NIGHTHAWK STREET (NFB SUBDIV 2) PAVED 362 36 PSDE** NORTH FOREST BEACH DRIVE DUNE LANE
59 OAK PARK DRIVE PAVED 764 50 MATHEWS DRIVE DEAD END
60 OFFICE PARK ROAD PAVED 2274 60 POPE AVENUE GREENWOOD DRIVE
61 OSPREY STREET (NFB SUBDIV 2) PAVED 365 36 PSDE** NORTH FOREST BEACH DRIVE DUNE LANE
62 OTTER HOLE ROAD PAVED 935 50 PEMBROKE DRIVE DEAD END
63 PELICAN STREET PAVED 1421 50 / 30 NORTH FOREST BEACH DRIVE DEAD END (LAND SIDE)
64 PELICAN STREET (NFB SUBDIV 2) PAVED 364 36 PSDE** NORTH FOREST BEACH DRIVE DUNE LANE
65 POWER ALLEY PAVED 873 50 MATHEWS DRIVE DEAD END
66 QUAIL STREET (NFB SUBDIV 2) PAVED 368 36 PSDE** NORTH FOREST BEACH DRIVE DUNE LANE
67 QUEENS WAY (WHP-HARGRAY) PAVED 340 NONE / THHI LAND US 278 DEAD END (HARGRAY)
68 RHINER DRIVE PAVED 792 50 GUMTREE ROAD DEAD END
69 ROADRUNNER LANE** PAVED 137 20 PSDE** NORTH FOREST BEACH DRIVE DEAD END
70 ROBIN STREET (NFB SUBDIV 2) PAVED 370 36 PSDE** NORTH FOREST BEACH DRIVE DUNE LANE
71 SANDPIPER STREET PAVED 1272 50 / 30 NORTH FOREST BEACH DRIVE DEAD END (LAND SIDE)
72 SANDPIPER STREET (NFB SUBDIV 2) PAVED 360 36 PSDE** NORTH FOREST BEACH DRIVE DUNE LANE
73 SEA OAK LANE PAVED 964 50 DOGWOOD LANE DEAD END
74 SUMMIT DRIVE PAVED 2534 50 GATEWAY CIRCLE DEAD END
75 TANGLEWOOD DRIVE PAVED 1562 50 SOUTH FOREST BEACH DRIVE NASSAU STREET
76 THOMPSON STREET PAVED 320 50 MATHEWS DRIVE ELECTRIC AVENUE
77 TOWN CENTER COURT PAVED 262 NONE / THHI LAND WEXFORD DRIVE DEAD END
78 VIOLA ROAD UNPAVED 377 NONE / AXS ESMT CHAMBERLINE DRIVE DEAD END
79 WANDERER LANE** PAVED 365 20 PSDE** NORTH FOREST BEACH DRIVE DEAD END
80 WILD HORSE ROAD PAVED 1151 50 US 278 OLD WILD HORSE ROAD
81 WILEY ROAD PAVED 845 50 DILLON ROAD DEAD END
77 TOTAL 16.08 miles of roads
2 UNPAVED 0.14 miles of dirt roads (Driveways serving < 6 dwellings)
75 PAVED 15.94 miles of paved roads
The Town currently MAINTAINS 77 roads
but only 59 are in PUBLIC R/W
* 50' Access Easement on Town Land
* * PSDE only, but includes road pavement(NFB SUBDIV 2 and SUBDIV 3)
TOWN OF HILTON HEAD ISLAND ROADS
RELEVANT QUANTITIES:
Ownership and Maintenance Responsibilities
November, 2024
Page 230 of 329
1
Name Length in feet
ALLEN ST 436.8075833
BOUNDARY ST 2177.735289
BRIDGE ST 1461.100077
BUCKWALTER PLACE BLVD 3598.139818
CALHOUN ST 2292.050359
CHURCH ST 433.0791049
COLCOCK ST 300.0828459
COVE ST 240.3134195
DR MELLICHAMP 924.7448415
DUBOIS LN 930.5809358
FUTURE HAMPTON PKWY 2770.075488
GREEN ST 435.2409384
GUERRARD AVE 1012.617731
HAMPTON PKWY 9744.135559
INNOVATION DR 2478.578222
LAWRENCE ST 1716.369766
LAWTON ST 432.3258926
MAIDEN LN 1167.435217
POPE LN 315.819728
PRITCHARD ST 2707.911306
PROGRESSIVE ST 308.3596539
S INNOVATION DR 613.9662324
THOMAS HEYWARD ST 1175.868961
WATER ST 686.6288976
WHARF ST 641.6945247
Total 39001.66239 7.386678483
Page 231 of 329
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION OF AWARD TO WILDWOOD CONTRACTORS, INC. FOR THE CONSTRUCTION OF THE DEPOT
ROAD PATHWAY PROJECT IN THE AMOUNT OF $552,531.54
MEETING NAME AND DATE:
Public Facilities Committee August 18, 2025
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of award to Wildwood Contractors, Inc. for the construction of the Depot Road
Pathway Project in the amount of $552,531.54
PRESENTER INFORMATION:
Bryan Bauer, P.E., Director of Engineering, 5 Min
ITEM BACKGROUND:
On April 15, 2025, Beaufort County published an Invitation for Bid (IFB) #051625 Depot Road Pathway Project
requesting competitive bids for the material procurement and construction of approximately 0.36 miles of a
10- ft concrete path on Depot Road. On May 16, 2025, the County received three (3) bids to perform the
specified scope of work. Wildwood Contractors was the apparent lowest responsive bidder. As part of the
2018 one cent transportation sales tax, a program of pathways was identified for construction to provide
better and safer access to pedestrians at key areas in Beaufort County. This project will provide access and
connection from the Spanish Moss Trail along Depot Road to Ribaut Road. The project also includes some
clearing, drainage, paving, signs, striping, traffic control and erosion control.
FISCAL IMPACT:
The contract fee for materials and construction is $502,301.40. Staff recommend a 10% contingency of
$50,230.14, bringing the project budget to $552,531.54. The funding for this project is from the 2018 Sales
Tax Pathway Fund, account number 4705-80-0000-54500 with a balance of $13,150,500.94. Partial funding in
the amount of $200,000 will be provided as a reimbursement from a Community Development Block Grant
through the City of Beaufort.
APPROVAL HISTORY:
Page 232 of 329
Line Item Description
1 1031000 MOBILIZATION
2 1032010 BONDS AND INSURANCE
3 1050800 CONSTRUCTION STAKES, LINES & GRADES
4 2012000 CLEAR.& GRUB. WITHIN RDWY.
5 2023000 REM. & DISP.OF EXIST. PAVEMENT
6 2024100 REM & DISPOSAL OF EXISTING CURB
7 2031000 UNCLASSIFIED EXCAVATION
8 2033000 BORROW EXCAVATION
9 2034000 MUCK EXCAVATION
10 3059900 MAINTENANCE STONE
11 4011004 LIQUID ASPHALT BINDER PG64-22
12 4020320 ASPHALT BASE COURSE TYPE B
13 4040350 ASPHALT SURFACE COURSE TYPE D
14 6011000 TRAFFIC CONTROL
15 6051120 PERM CONSTRUCTION SIGNS (GRND MNTD)
16 6271015 8" WH. SLDLNES THERMO.-125 MIL
17 6271025 24" WH SLDLNES THERMO-125 MIL.
18 6319505 REM OF PVMT MARK(HI PRES
WATER)(LINES)(T/C)19 6510105 FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN
20 6531210 U-SECTION POST FOR SIGN SUPPORTS - 3P
21 7141112 15" RC PIPE CUL.-CLASS III
22 7149999 CLEANING EXISTING PIPE
23 7197052 PIPE COLLAR FOR UP TO 24" RCP
24 7197110 ADJUST CATCH BASIN
25 7204000 CONCRETE WASHOUT
26 7204100 CONCRETE SIDEWALK(4" UNIFORM)
27 7204600 CONCRETE SIDEWALK(6" UNIFORM)
28 7204900 DETECTABLE WARNING MATERIAL
29 7209000 PEDESTRIAN RAMP CONSTRUCTION
30 8068154 ORNAMENTAL STEEL PICKET FENCE - 54"
31 8081001 MOVING ITEM #1 (RELOCATE FENCE)
32 8091010 RIGHT OF WAY MARKER(REBAR&CAP)
33 8091050 RIGHT OF WAY PLAT
Page 233 of 329
34 8100100 PERMANENT COVER
35 8100200 TEMPORARY COVER
36 8101110 STRAW OR HAY MULCH W/ TACKIFIER
37 8104005 FERTILIZER (NITROGEN)
38 8104010 FERTILIZER (PHOSPHORIC ACID)
39 8104015 FERTILIZER (POTASH)
40 8105005 AGRICULTURAL GRANULAR LIME
41 8109050 SELECTIVE WATERING
42 8109901 MOWING
43 8114010 TREE PROTECTION
44 8131000 SODDING
45 8151101 TURF REINF. MATTING (TRM) TYPE 1
46 8151202 H.E.C.P.-TYPE 2
47 8152007 SEDIMENT TUBES FOR DITCH CHECKS
48 8153000 SILT FENCE
49 8153090 REPLACE/REPAIR SILT FENCE
50 8154050 REM/SILT RETAIN BY SILT FENCE
51 8156200 CLEANING INLET STRUCTURE FILTERS
52 8156212 INLET STR FILTER - TYPE E (CB TYPE 16)
53 8156219 INLET STRUCTURE FILTER - TYPE A
Total
Page 234 of 329
FIRST CONSTRUCTION MANAGEMENT, LLC
Quantity Unit of Measure Unit Cost
1 LS $80,000.00
1 LS $18,000.00
1 EA $35,000.00
1 LS $65,000.00
440 SY $46.00
10 LF $250.00
66 CY $88.00
986 CY $98.00
706 CY $78.00
40 TON $115.00
2 TON $700.00
10 TON $350.00
20 TON $350.00
1 LS $65,000.00
288 SF $24.00
385 LF $10.00
570 LF $19.00
45 LF $150.00
62 SF $20.00
124 LF $40.00
12 LF $275.00
56 LF $150.00
1 EA $3,500.00
3 EA $3,800.00
1 EA $1,250.00
2215 SY $77.00
510 SY $87.00
265 SF $85.00
135 SY $185.00
190 LF $75.00
1 LS $9,900.00
18 EA $500.00
1 LS $5,000.00
Page 235 of 329
0.25 AC $7,500.00
0.5 AC $4,000.00
0.25 AC $5,000.00
25 LB $4.00
25 LB $4.00
25 LB $4.00
500 LB $4.00
7000 GAL $.75
1.5 ACRE $1,500.00
6 EA $1,000.00
0.3 MSY $10,000.00
0.4 MSY $5,000.00
0.25 AC $6,000.00
40 LF $35.00
2200 LF $5.50
220 LF $5.00
550 LF $1.00
12 EA $100.00
3 EA $350.00
20 LF $35.00
Page 236 of 329
KTC Enterprises, Inc.
Total Unit Cost
$80,000.00 $41,500.00
$18,000.00 $35,500.00
$35,000.00 $11,500.00
$65,000.00 $45,000.00
$20,240.00 $20.00
$2,500.00 $50.00
$5,808.00 $100.00
$96,628.00 $45.00
$55,068.00 $35.00
$4,600.00 $20.00
$1,400.00 $697.00
$3,500.00 $375.00
$7,000.00 $375.00
$65,000.00 $70,000.00
$6,912.00 $27.00
$3,850.00 $6.00
$10,830.00 $20.00
$6,750.00 $24.00
$1,240.00 $46.00
$4,960.00 $33.35
$3,300.00 $320.00
$8,400.00 $65.00
$3,500.00 $3,800.00
$11,400.00 $4,000.00
$1,250.00 $1,900.00
$170,555.00 $94.50
$44,370.00 $106.00
$22,525.00 $85.00
$24,975.00 $125.00
$14,250.00 $370.00
$9,900.00 $7,500.00
$9,000.00 $200.00
$5,000.00 $6,200.00
FIRST CONSTRUCTION MANAGEMENT, LLC
Page 237 of 329
$1,875.00 $4,000.00
$2,000.00 $4,000.00
$1,250.00 $8,000.00
$100.00 $6.00
$100.00 $6.00
$100.00 $6.00
$2,000.00 $10.00
$5,250.00 $.40
$2,250.00 $1,500.00
$6,000.00 $800.00
$3,000.00 $12,000.00
$2,000.00 $3,000.00
$1,500.00 $12,000.00
$1,400.00 $30.00
$12,100.00 $4.00
$1,100.00 $4.00
$550.00 $2.00
$1,200.00 $300.00
$1,050.00 $650.00
$700.00 $44.00
$868,236.00
Page 238 of 329
Wildwood Contractors, Inc.
Total Unit Cost
$41,500.00 $33,700.00
$35,500.00 $7,000.00
$11,500.00 $20,000.00
$45,000.00 $30,000.00
$8,800.00 $30.00
$500.00 $100.00
$6,600.00 $45.00
$44,370.00 $42.00
$24,710.00 $35.00
$800.00 $100.00
$1,394.00 $500.00
$3,750.00 $300.00
$7,500.00 $300.00
$70,000.00 $8,000.00
$7,776.00 $15.60
$2,310.00 $6.00
$11,400.00 $18.00
$1,080.00 $12.00
$2,852.00 $21.00
$4,135.40 $20.40
$3,840.00 $200.00
$3,640.00 $40.00
$3,800.00 $1,000.00
$12,000.00 $2,500.00
$1,900.00 $500.00
$209,317.50 $65.00
$54,060.00 $81.00
$22,525.00 $35.00
$16,875.00 $71.00
$70,300.00 $106.00
$7,500.00 $8,640.00
$3,600.00 $120.00
$6,200.00 $1,500.00
KTC Enterprises, Inc.
Page 239 of 329
$1,000.00 $12,000.00
$2,000.00 $9,000.00
$2,000.00 $1,440.00
$150.00 $4.80
$150.00 $4.80
$150.00 $4.80
$5,000.00 $.48
$2,800.00 $.25
$2,250.00 $300.00
$4,800.00 $500.00
$3,600.00 $13,000.00
$1,200.00 $6,250.00
$3,000.00 $2,000.00
$1,200.00 $10.00
$8,800.00 $4.50
$880.00 $4.50
$1,100.00 $2.00
$3,600.00 $100.00
$1,950.00 $100.00
$880.00 $10.00
$793,544.90
Page 240 of 329
Total
$33,700.00
$7,000.00
$20,000.00
$30,000.00
$13,200.00
$1,000.00
$2,970.00
$41,412.00
$24,710.00
$4,000.00
$1,000.00
$3,000.00
$6,000.00
$8,000.00
$4,492.80
$2,310.00
$10,260.00
$540.00
$1,302.00
$2,529.60
$2,400.00
$2,240.00
$1,000.00
$7,500.00
$500.00
$143,975.00
$41,310.00
$9,275.00
$9,585.00
$20,140.00
$8,640.00
$2,160.00
$1,500.00
Wildwood Contractors, Inc.
Page 241 of 329
$3,000.00
$4,500.00
$360.00
$120.00
$120.00
$120.00
$240.00
$1,750.00
$450.00
$3,000.00
$3,900.00
$2,500.00
$500.00
$400.00
$9,900.00
$990.00
$1,100.00
$1,200.00
$300.00
$200.00
$502,301.40
Page 242 of 329
ST A TE OF SOUTH CAROLINA
COUNTY OF BEAUFORT
CONTRACT
Depot Road Pathway
THIS CONTRACT (hereinafter the "Contract") entered into this 5th day of August, 2025, between the
COUNTY OF BEAUFORT, South Carolina, a public body corporate and politic and political subdivision
of the State of South Carolina, (hereinafter "County") and Wildwood Contractors, Inc., (hereinafter the
"Contractor"), ("Party" as to each; collectively the "Parties")
WITNESS ETH:
WHEREAS, the County wishes to contract for Depot Road Pathway (the "Work" and/or "Services"); and
WHEREAS, the Contractor has represented to the County that its staff is qualified to provide the Work
required in this Contract in a professional , timely manner; and
WHEREAS, the County has relied upon the above representations by the Contractor;
NOW, THEREFORE, in consideration of these premises and covenants set forth herein, it is agreed by and
between the Parties as follows :
SECTION ONE
Contract Documents
The Parties agree that the Contract Documents shall include the following , which are incorporated herein
by reference:
Exhibit A: Contractor's Schedule of Values dated May 16th, 2025.
Exhibit B: Solicitation Number IFB 051625
In the event of any conflict, discrepancy, or inconsistency among any of the documents which make up this
Contract, the following shall control:
As between the Contract and the Contract Documents which make up this Contract , the Contract
shall govern.
In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents,
the Contractor shall the County immediately upon discovery of the same for resolution by the
County.
Any documents not included or expressly contemplated in this Contract do not, and shall not, form
a part of this Contract. The Contract Documents are intended to be complementary, and a
requirement in one document shall be deemed a requirement in all documents.
SECTION TWO
Scope of Work
The Contractor agrees to perform and furnish all labor, supervision , materials, equipment, transportation
and supplies necessary for the comple tion of the Work required under this Contract in a timely and
1
Page 243 of 329
workmanlike manner, professional m all aspects, and m accord with all applicable laws, rules and
regulations .
The Contractor shall provide the services outlined below in conjunction with the Contractor's Bid dated
May 16th, 2025 marked as Exhibit A, that was previously incorporated by reference . The Contractor shall
commence the Work as specified in the Notice to Proceed, when it is issued , but not before it is issued.
Coordination of the Work and administrat ion of this Contract shall be by Beaufort County.
SECTION THREE
Contract Price: Payment Terms
County agrees to pay for the performance of the Work described in this Contract , including all items
necessary to accomplish and complete the Work, in accordance with all terms and condi tions as stated
herein on the following basis:
Contract Amount: Five Hundred Two Thousand Three Hundred One Dollars and Forty Cents
($502,301.40)
Payments:
Contractor will be paid on a percentage complete basis with the submission of monthly invoices.
Monthly payments will be made based on a percentage of services rendered and any expenses incurred .
Final payment which shall be paid upon Final Acceptance by the County's authorized representative. Final
Acceptance is defined as the County accepting the Work from the Contractor when the County deems the
Work completed in accordance with the terms of the Contract.
Final Payment is defined as the last payment from the County to the Contractor of the entire unpaid balance
of the Contract sum as adjusted by any approved change orders.
Application for payment shall be prepared and submitted electronically. All invoices shall be addressed to
Beaufort County Engineering Department PO Drawer, 1288 Beaufort SC 29901.
SECTION FOUR
Time: Term of Contract
The County hereby contracts with Contractor to provide the Work specified herein within One Hundred
Twenty (120) calendar days after issuance of the Notice to Proceed .
The County reserves the right to extend the term of this Contract, ifit is determined to be in its best interest.
The Contractor expressly acknowledges that time is of the essence in completion of this Contract and that
the time limits and dates herein are critical components of the Contract. Therefore, Liquidated Damages
are set as per SCOOT Standard Specifications for Highway Construction Section I 08.9. The Contractor
warrants and represents that it has taken these facts into consideration and has determined that it can
complete the work within these time limits, including time for likely delays caused by weather or from
other sources . The Contractor will not be compensated for any delays beyond the time set forth herein . The
Contractor's only remedy for delays may be an extension of time to perform the Work. Due consideration
will be given to claims for an extension of time due to extraordinary circumstances only.
2
Page 244 of 329
SECTION FIVE
Insurance Requirements
The Contractor, at its own expense, shall at all times during the term of the Contract, maintain insurance as
included in the solicitation, Insurance Requirements, which is attached hereto and previously incorporated
by reference. The County may contact the Contractor's insurer(s ) or insurer(s)' agent(s) directly at any time
regarding the Contractor's coverages, coverage amounts, or other such relevant and reasonable issues
related to this Contract. The Contractor shall also require any subcontractors to carry the same coverages
in the same amounts.
The County must be advised immediately of any changes in required coverages.
SECTION SIX
Compliance with Legal Requirements
All applicable federal, state and local laws, ordinances, and rules and regulations of any authorities
(including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of
Revenue or the S.C. Board of Contractors ) shall be binding upon the Contractor throughout the pendency
of the Work. The Contractor shall be responsible for compliance with any such law, ordinance, rule or
regulation, and shall hold the County harmless and indemnify same in the event of non-compliance as set
forth in the Contract.
The Contractor certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of South
Carolina Code of Laws (1976, as amended) and agrees to provide to the State upon request any
documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable to the Contractor and
its subcontractors or sub-subcontractors; or (b) that the Contractor and its subcontractors or
subsubcontractors are in compliance with Title 8, Chapter 14.
Pursuant to Section 8-14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent
document, statement, or report pursuant to this chapter is guilty of a felony and, upon conviction, must be
fined within the discretion of the Court or imprisoned for not more than five years, or both."
The Contractor agrees to includ e in any contracts with subcontractors, language requiring subcontractors
to (a) comply with applicable requirement s of Title 8, Chapter 14, and (b) include in its contracts with the
subcontractors language requiring the sub-subcontractors to comply with the applicable requirements of
Title 8, Chapter 14.
The Contractor agrees to and shall certify agreement to abide by the requirements under Title VI of the
Civil Rights Act of 1964, and other non-discrimination authorities under Federal Executive Order Number
11246, as amended, and specifically the provisions of the equal opportunity clause.
The Contractor shall comply with all federal , state and local laws, ordinances, rules and regulations of any
authorities throughout the duration of this Contract. The Contractor shall be responsible for compliance
with any such law, ordinance, rule or regulation, and shall hold the County harmless and indemnify same
in the event of non-compliance.
3
Page 245 of 329
SECTION SEVEN
Drug-free Workplace Act
The Contractor shall comply with the South Carolina Drug-free Workplace Act, Section 44-107-1 0 et seq.,
S.C. Code of Laws ( 1976, as amended). The County requires all contractors executing contracts for a stated
or estimated value of$50,000 or more to sign a Drug-free Workplace Certification form prior to the issuance
of the Notice to Proceed.
SECTION EIGHT
Contractor's Warranties and Representations
The Contractor represents that its staff is knowledgeable about and experienced in performing the Work
required in this Contract and warrants that it will use best skill and attention to provide above described
Work in a professional, timely manner.
The Contractor warrants and represents that it shall be responsible for all subcontractors working directly
for it, as well as for their work product, as though the Contractor had performed the Work itself.
I. If equipment, materials and supplies are to be a part of the service provided, all equipment,
materials, and supp
Text truncated. Open the original for the full document.
Source: Beaufort County website. First collected Nov 8, 2026.