Natural Resources Committee — Agenda Packet
Beaufort County · Beaufort County · Natural Resources Committee · meeting of Jun 2, 2025 · Agenda packets
Open the original document More from Beaufort County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Natural Resources Committee
Beaufort County, SC
2nd Floor Magistrates Courtroom, Arthur Horne Building, 104 Ribaut Road, Beaufort, SC
29901
Monday, June 02, 2025
3:00 PM
*or at the conclusion of the Community Services Committee no sooner than 3:00PM*
AGENDA
COMMITTEE MEMBERS:
YORK GLOVER, CHAIRMAN PAULA BROWN VICE-CHAIR
GERALD DAWSON LAWRENCE MCELYNN
ANNA MARIA TABERNIK ALICE HOWARD, EX OFFICIO
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. STATEMENT OF COMPLIANCE WITH FIOA
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES- April 8, 2025
6. CITIZEN COMMENTS PERIOD – 15 MINUTES TOTAL
7. ASSISTANT COUNTY ADMINISTRATOR REPORT
8. 2024 ANNUAL REPORT PRESENTATION FROM FRIENDS OF FORT FREMONT 2024 ANNUAL REPORT
- Barney Forsythe, President, Friends of Fort Fremont
9. APPROVAL TO FUND DUE DILIGENCE AND NEGOTIATE TERMS OF ACQUISITIONS FOR THE FOLLOWING
PROPOSED GREEN SPACE PROGRAM APPLICATIONS (SEA ISLAND PARKWAY T RACTS, CHELSEA
TRACTS) (FISCAL IMPACT: Sea Island Parkway Tracts- up to $30,000 due diligence, Chelsea Tracts- n/a.
Green Space Program Fund Account #4706 -10-0000-54400) - Mike McShane, Chair of Green Space
Advisory Committee & Mark Davis, Green Space Program Manager
10. AN ORDINANCE AMENDING THE ZONING MAP FOR 11 ACRES LOCATED ON BURNT CHURCH ROAD (R600
039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000) FROM T3 HAMLET
NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) TO T3 NEIGHBORHOOD (T3N) - (FISCAL
IMPACT: n/a) - Robert Merchant, AICP, Director, Beaufort County Planning and Zoning
11. AN ORDINANCE AMENDING THE ZONING MAP FOR 86.56 ACR ES LOCATED AT 98 JENNINGS ROAD (R100
028 000 0264 0000) FROM T2 RURAL (T2R) TO T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET
1
County Council Agenda – Beaufort County, SC
CENTER (T4HC) UTILIZING THE HAMLET PLACE TYPE OVERLAY (PTO) (FISCAL IMPACT: n/a) - Robert
Merchant, AICP, Director, Beaufort County Planning and Zoning
12. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A MEMORANDUM OF
UNDERSTANDING WITH THE PORT ROYAL SOUND FOUNDATION FOR SURFACE ELEVATION TABLE
STATION COLLABORATION. (FISCAL IMPACT: None) - Stefanie Nagid, Director, Land Preservation
13. A RESOLUTION TO APPROVE THE INSTALLATION OF STREET LIGHTS AT OYSTER FACTORY PARK. (FISCAL
IMPACT: None to the County) - Stefanie Nagid, Director, Land Preservation
14. REAPPOINTMENT OF EVAN BROMLEY TO THE ZONING BOARD OF APPEALS FOR A THREE-YEAR TERM WITH
THE EXPIRATION DATE OF MAY 2028.
15. ADJOURNMENT
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
2
Natural Resources Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, April 07, 2025
4:00 PM
MINUTES
COMMITTEE MEMBERS:
YORK GLOVER, CHAIRMAN PAULA BROWN VICE-CHAIR
GERALD DAWSON LAWRENCE MCELYNN
ANNA MARIA TABERNIK ALICE HOWARD, EX OFFICIO
The video stream of this meeting is available on the County’s website:
https://beaufortcountysc.new.swagit.com/videos/339270
1. CALL TO ORDER
Committee Chairman Glover called the meeting to order at 4:00 pm.
PRESENT
Committee Chair York Glover
Committee Vice-Chair Paula Brown
Council Member Gerald Dawson
Council Chair Alice Howard
Council Member Lawrence McElynn
Council Member Joseph Passiment
Council Member Thomas Reitz
Council Vice-Chair Anna Maria Tabernik
ABSENT
Council Member David Bartholomew
Council Member Logan Cunningham
Council Member Mark Lawson
2. PLEDGE OF ALLEGIANCE
Committee Chairman Glover led the Pledge of Allegiance.
3
Item 5.
Natural Resources Committee Minutes – Beaufort County, SC
3. PUBLIC NOTIFICATION OF THIS MEETING HAS BEEN PUBLISHED, POSTED, AND DISTRIBUTED IN
COMPLIANCE WITH THE SOUTH CAROLINA FREEDOM OF INFORMATION ACT
4. APPROVAL OF AGENDA
Motion: It was moved by Council Member Dawson, Seconded by Council Chair Howard, to approve the
agenda.
The Vote: The motion was approved without objection.
5. APPROVAL OF MINUTES - March 3, 2025
Motion: It was moved by Council Member Dawson, Seconded by Committee Vice -Chair Tabernik, to
Approve the Minutes from March 3, 2025.
The Vote: The motion was approved without objection.
6. PUBLIC COMMENT PERIOD – 15 MINUTES TOTAL
Attorney Kevin Dukes- Pine Island Down Zoning
Dr. McShane- Introducing Dr. Bridges with Nemoors, Wildlife Resource for County.
7. ASSISTANT COUNTY ADMINISTRATOR REPORT - Rob Merchant, Planning and Zoning Director
Update and presentation by Rob Merchant on the Southern Lowcountry Regional Board (SoLo Co)
Committees
8. Plastics Ordinance Update - Juliana Smith, Environmental Long Range Planner
Update and presentation on the plastics ordinance by Rob Merchant, Planning and Zoning Director.
AGENDA ITEMS
9. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE DOCUMENTS
NECESSARY AND TO PROVIDE FUNDS TO CONTRIBUTE TO THE PROCUREMENT BY THE OPEN LAND
TRUST FOR A CONSERVATION EASEMENT ON PROPERTY LOCATED IN UNINCORPORATED BEAUFORT
COUNTY KNOWN AS TROTTER’S LOOP - PIN# R200 004 000 0285 0000, R200 004 000 059A 0000, R200
004 000 065B 0000, R200 004 000 065A 0000, R200 004 000 065C 0000, R200 004 000 065D 0000, R200
004 000 0065 0000, R200 004 000 066A 0000, R200 004 000 0066 0000, R200 004 000 0067 0000, R200
004 000 0057 0000, R200 004 000 057C 0000, R200 004 000 057D 0000, R200 004 000 073A 0000, R200
004 000 073C 0000, R200 004 000 071A 0000, R200 004 000 0058 0000, R200 003 000 0016 0000 (FISCAL
IMPACT: ($310,000 from the Green Space Program Fund Account #4706 -10-0000-54400 Land
Acquisition) - Mike McShane, Greenspace Committee Chair
The Open Land Trust submitted a Green Space Program Conservation Easement application on behalf of
the landowners for consideration. On June 10, 2024, the Community Services and Land Use Committee
approved due diligence and negotiations of the application. On March 7, 2025. the Green Space Advisory
Committee (GSAC) met, reviewed existing due diligence provided by the applicant, and voted to
4
Item 5.
Natural Resources Committee Minutes – Beaufort County, SC
recommend approval for the contribution of funds not to exceed the requested amount of $310,000.00.
The GSAC vote was unanimous.
Trotter's Loop is privately owned 55 +/ - acre property located in unincorporated Beaufort County on
Pleasant Point Drive and Trotter's Loop. The Open Land Trust (applicant) is working with the property
owners to place a conservation easement over the entire property, which is currently comprised of (18)
individual parcels that would be consolidated into three (3) parcels. The conservation easement would
allow for a maximum of five (5) total par cels. The appraised value for the conservation easement is
approximately $775,000.00. The application requests 40% funding ($310,000.00) from the Green Space
Program and the landowners donating 60% of the easement value ($465,00.00). The conservation
easement will be held and managed by the Open Land Trust and will protect this property in perpetuity.
A preservation outcome for this property would achieve several goals of the Green Space Program,
including: preservation of intact natural habitats for plants and animals; protection of water quality; and
preservation of scenic corridors along rural county and state roadways.
GSAC recommends approval to fund the application, not to exceed the requested amount of $310,000.00.
Motion: It was moved by Council Mem ber Brown, Seconded by Council Vice -Chair Tabernik, to Approve
A Resolution Authorizing the County Administrator to Execute the Documents Necessary and to Provide
Funds to Contribute to the Procurement by the Open Land Trust for a Conservation Easement on Property
Located in Unincorporated Beaufort County Known as Trotter's Loop - PIN# R200 004 000 0285 0000,
R200 004 000 059A 0000, R200 004 000 065B 0000, R200 004 000 065A 0000, R200 004 000 065C 0000,
R200 004 000 065D 0000, R200 004 000 065 0000, R200 00 4 000 066A 0000, R200 004 000 0066 0000,
R200 004 000 0067 0000, R200 004 000 0057 0000, R200 004 000 057C 0000, R200 004 000 057D 0000,
R200 004 000 073A 0000, R200 004 000 073C 0000, R200 004 000 071A 0000, R200 004 000 0058 0000,
R200 003 000 0016 0000
The Vote: The motion was approved without objection.
10. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE DOCUMENTS
NECESSARY AND TO PROVIDE FUNDS TO CONTRIBUTE TO THE PROCUREMENT BY BEAUFORT COUNTY
FOR FEE SIMPLE REAL PROPERTY LOCATED IN UNINCORPORATED BEAUFORT COUNTY KNOWN AS THE
NORTH WIDGEON TRACTS (PIN# R600 007 000 001A 0000, R600 007 000 0011 0000, R600 007 000 0010
0000, R600 007 000 0009 0000, R600 007 000 0008 0000, R600 007 000 0007 0000, R600 007 000 0006
0000, R600 007 000 0005 0000) (FISCAL IMPACT: $250,000 from the Green Space Program Fund Account
#4706-10-0000-54400 - Land Acquisition) - Mike McShane, Greenspace Committee Chair
This Rural and Critical Lands Preservation Program project was also submitted to the Green Space Program
to support their work and purchase of properties.
The North Widgeon Tracts comprise 9.55 +/- acres in unincorporated Beaufort County along Highway 170,
the Broad River. They are adjacent to a Beaufort County -owned and operated Passive Park, Widgeon
Point. The Open Land Trust (applicant) applied to the Green Space Program to partner with the final
project of the Rural and Critical Lands Preservation Program. A preservation outcome for this property
would achieve many goals of the Green Space Program, including preservation of an intact natural habitat
for plants and animals, protection of water quality, preservation of an established maritime forest,
improved environmental resilience, protection of viewsheds along Highway 170, the Port Royal Sound,
the Broad River, Wigeon Point, and expansion of an abutting Beaufort County owned and operated
Passive Park, offering public access.
Motion: It was moved by Council Vice-Chair Tabernik, Seconded by Council Member McElynn to Approve
a Resolution Authorizing the County Administrator to Execute the Documents Necessary and to Provide
5
Item 5.
Natural Resources Committee Minutes – Beaufort County, SC
Funds to Contribute to the Procurement by Beaufort County for Fee Simple Real Property Located in
Unincorporated Beaufort County Known as the North Widgeon Tracts PIN# R600 007 000 001A 0000, R600
007 000 0011 0000, R600 007 000 0010 0000, R600 007 000 0009 0000, R600 007 000 0008 0000, R600
007 000 0007 0000, R600 007 000 0006 0000, R600 007 000 0005 0000.
The Vote: The motion was approved without objection.
11. AN ORDINANCE AUTH ORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY
DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF TAX MAP SERIAL NUMBERS TMS R600
007 000 001A 0000, R600 007 000 0005 0000, R600 007 000 0006 0000, R600 007 000 0007 0000, R600
007 000 0008 0000, R600 007 000 0009 0000, R600 007 000 0010 0000, AND R600 007 000 0011 0000,
ALSO KNOWN AS NORTH WIDGEON FEE (Fiscal Impact: $2,200,000 plus closing costs from Beaufort
County Rural and Critical Land Preservation Program Bond Referendum Account # 4500-80-0000-54400)
- Amanda Flake
The Rural and Critical Land Preservation Board recommended pursuing due diligence on 10/7/2024, and
the Community Service and Land Use Committee voted to approve due diligence on 10/14/24. Partner
funds were applied for and sought for the Green Space Program and SC Conservation Bank. With staff
recommendations, the RCLP Board recommended purchasing, utilizing $2,200,000.00 of RCLP Bond funds,
on January 13, 2025.
The county land preservation department prioritizes North Widgeon Fee due to its physical and visual
proximity to Widgeon Point Preserve. The property consists of +/- 9.55 high acres along the banks of the
Broad River and has access from Highway 170 at the base of the Broad River Bridge. The landowners
applied to the Rural a nd Critical Lands Program in September 2024, and the RCLP Board unanimously
supported the project. The total purchase price of $2,700,000.00 represents a bargain sale by the
landowners, $2,200,000.00 is recommended from the RCLP Bond funds (Fund 4500), $25 0,000.00 was
sought and recommended by the Green Space Advisory Board (a concurrent resolution references these
funds) and $250,000.00 was applied for and approved by the SC Conservation Bank on March 19, 2025.
This funding partnership mirrors the requirem ent to acquire Widgeon Point Preserve nearby, and it will
utilize the majority of the remaining funds from the Rural and Critical Lands Program to expand this crucial
public access. Staff supports this recommendation.
Motion: It was moved by Council Member Passiment, Seconded by Council Member Dawson to Approve
an Ordinance Authorizing the County Administrator to Execute the Necessary Documents and Provide
Funding for the Purchase of Tax Map Serial Numbers TMS R600 007 000 001A 0000, R600 007 000 0005
0000, R600 007 000 0006 0000, R600 007 000 0007 0000, R600 007 000 0008 0000, R600 007 000 0009
000, R600 007 000 0010 0000 AND R600 007 000 0011 0000, also Known as North Widgeon Fee.
The Vote: The motion was approved without objection.
12. ADJOURNMENT
4:53 PM
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
Ratified:
6
Item 5.
7
Item 6.
#3 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: --------
Name: Print:_/)_. I'_. _/k_L_f�;()_�j��----'-/},...J ________ _
Signature: _______________________
Home Address: ---------------------
Em ail Address: ---------------------
Phone Number: District: ----------- --------
Topic: _______________________ _
-#4 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: --------
Name: Print: _____________________ _
Signature: _______________________
Home Address: ---------------------
Em ail Address: ____________________ _
Phone Number: ___________ District: ______ _
Topic: _______________________ _
8
Item 6.
Pocotaligo Preserve
Management Plan
Stefanie M. Nagid, Director
Land Preservation Department
June 2, 2025
9
Item 7.
Property
Description
• 527 acres acquired on
October 20, 2023 for
$5,449,000
• Acquisition purposes
include:
• Protection of
natural resources
• Connectivity and
ecological
contribution to the
ACE Basin
• Future public access
for passive
recreation
• Bound by Hwy 17 (W),
Cotton Hall Road (N),
10
Item 7.
Natural Resources
Current Conditions
• Fallow fields (~180 acres)
• 10 stands
• Previously farmed, currently recovering
with native grasses, forbs and trees
• Forested mesic uplands (~97 acres)
• 2 stands (8, 14)
• Currently intact on northern section
• Forested wetlands (~110 acres)
• 2 stands (6, 7)
• Previously clearcut on southern
section, currently recovering with
early successional species
• Impoundments (~140 acres)
• 4 stands
• Previously semi-managed, currently open
flow and needs improvements
11
Item 7.
12
Item 7.
Habitat
Management
and
Restoration
• Maintain and enhance
the existing forested
mesic uplands and
forested wetlands
• Targeted removal of
invasive exotic
vegetation (Chinese
Tallow)
• Allow nature to
evolve and recover
through natural
processes
• Possible
supplemental
hardwood tree
plantings if needed
13
Item 7.
Habitat
Management and
Restoration
• Restore and enhance the
existing fallow fields
to longleaf/grassland
and grassland savannahs
• Prescribed burning
to promote native
grasses and forbs
• Longleaf pine
restoration in
appropriate areas
• Maintain open
grasslands in
appropriate areas
14
Item 7.
Habitat
Management
and
Restoration
• Enhance the
existing
impoundments
• Repair water
control
structures and
infrastructure
to improve
connectivity
and flow
• Enhance
habitat for
fish and avian
fauna
15
Item 7.
Infrastructure Improvements
1) Replacement of culverts, flap
gates and risers
2) Repair and stabilize existing
dikes
3) Excavate circulation canals
16
Item 7.
Public Access Planning and
Development
• Immediate need for water control structure repairs for
access and safety
• Army Corps permit to implement recommended improvements
was submitted in October 2024; anticipate response in
June/July 2025
• Public access planning and permitting can begin after
initial repairs are completed
• Once begun, may take 2-4 years to complete plans and all
necessary permits
• Access improvements likely to occur in stages over 5-7
years until complete
• Management and restoration will not end
• Prescribed burning will be ongoing every 2-3 years, in
perpetuity
• Impoundment and canal excavation likely to occur in
17
Item 7.
Cost Estimates*
• Water Control Structure Repairs: $150,000 – FY26 budget
request
• Berm Stabilization/Canal Excavation: $750,000 - $1,000,000
• Prescribed Burning: $8,000 per event
• Longleaf Pine Reforestation: $20,000
• Invasive Exotic Vegetation Control: $5,000 per event
• Public Access Planning: $350,000
• Public Access Improvements: $7M-$10M
*Pre-tariff estimates and dependent upon funding, material
and labor availability
18
Item 7.
Timeline*
• FY25
Complete Management Plan
Complete initial
prescribed burn
• Obtain ACoE permit –
submitted
• FY26
• Complete initial water
control structure repairs
• Begin routine land
management actions
(reforestation,
prescribed burning,
exotic control,
monitoring)
• FY27
• Begin canal/berm
improvements
• FY28
• Complete canal/berm
improvements
• Complete conceptual
public access planning
• Begin civil planning and
permitting
• FY29
• Complete civil planning
and permitting
• Begin Phase I public
access construction
• FY30
• Complete Phase I public
access construction
*Dependent upon funding and permitting approvals
19
Item 7.
20
Item 7.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
PRESENTATION OF FRIENDS OF FORT FREMONT 2024 ANNUAL REPORT
MEETING NAME AND DATE:
Natural Resources Committee – June 2, 2025
PRESENTER INFORMATION:
Barney Forsythe, President, Friends of Fort Fremont (10 minutes)
ITEM BACKGROUND:
This is a presentation only
PROJECT / ITEM NARRATIVE:
The Friends of Fort Fremont have been operating the Fort Fremont History Center since November 2021. The
Friends of Fort Fremont welcomed over 6,000 visitors from 46 states and 13 foreign countries at the History
Center. Volunteers worked a total of 1,862 hours at the history center and 374 hours on grounds clean up.
Other activities included various educational and community outreach events, increased promotion on social
and print media, and enhancing the preserve with various artifacts and replicas of historic items.
FISCAL IMPACT:
N/A
STAFF RECOMMENDATIONS TO COUNCIL:
Presentation Only
OPTIONS FOR COUNCIL MOTION:
Presentation Only
21
Item 8.
Annual Report for
2024
to Beaufort County
Land Use Committee
Friends of Fort Fremont
June 2, 2025
Barney Forsythe, President
22
Item 8.
Mission of the
Friends of Fort
Fremont
To preserve and promote Fort Fremont
as an educational, historical, natural,
and cultural resource
of the Spanish-American War era
on the shores of historic Port Royal Sound
in Beaufort, South Carolina
23
Item 8.
Community
Partnership
24
Item 8.
Overview
History Center Operations
Facilities and Grounds
Enhancing the Visitor Experience
Educational Outreach
Community Outreach
Social Media
Marketing
25
Item 8.
History Center
Operations
• Staffed Center on Fridays,
Saturdays, and Sundays
• Extended hours in 2025—
Thursday 1:00-4:00
• Total of 1,862 volunteer hours
• Over 6,000 visitors (-20%)*
• 46 states
• 13 foreign countries
* Center closed for almost 2
months during peak times due to
weather-related issues that
impacted the electrical systems
at the history center
26
Item 8.
Facilities and
Grounds
• 374 volunteer hours + 28 AFJROTC
cadet volunteers
• General Cleanup
• Vegetation removal
• Clean up inside the batteries
27
Item 8.
Educational
Outreach
• Goal: get children excited about
history, Beaufort County
heritage, and Fort Fremont
• Linked to grades 5 and 8 social
studies curriculum
• 2 school groups
• School-age activities during
Harvest Festival
• Traveling Trunk
28
Item 8.
Community Outreach
29
Item 8.
Social Media
• Over 2,000 followers
• #5 of 18 on St Helena Island
www.fortfremont.org
30
Item 8.
Marketing
• Post and Courier101 Things to do in SC
• Newsletter 1000 copies
• SC Welcome Expo (postponed until early 2025)
• ATAX grant for $12,000 for use in
2025 THANK YOU!
• Rack Cards +5900
• SC Welcome Centers
• Arsenal
• Hunting Island
• Local hotels and BNBs
31
Item 8.
Enhancing
the Visitor
Experience
• Artifacts and Replicas
✓Delivery Table
✓Davit
✓Projectile
• Ammo Cart
• “Carl Project”
• Gun Position #1 Recreation
• Engineering Study Complete
• Digital Simulation with
West Point History Dept
Site visit early August
• Book Project: Draft in early June
32
Item 8.
Special
Thanks for a
Strong
Partnership!
Stephanie Nagid
Land Preservation
Department Director 33
Item 8.
Y’ ALL Come!
www.fortfremont.org
34
Item 8.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMEND APPROVAL TO FUND DUE DILIGENCE AND NEGOTIATE TERMS OF ACQUISITIONS FOR
THE FOLLOWING PROPOSED GREEN SPACE PROGRAM APPLICATIONS (SEA ISLAND PARKWAY
TRACTS, CHELSEA TRACTS)
MEETING NAME AND DATE:
Natural Resources Committee, June 2, 2025
PRESENTER INFORMATION:
Mr. Mike McShane, Chair of Green Space Advisory Committee & Mr. Mark Davis, Green Space
Program Manager (20 minutes)
ITEM BACKGROUND:
During their May 16, 2025 meeting, the Green Space Advisory Committee (GSAC) reviewed two new
applications. The recommendations from the (GSAC) are as follows:
PROJECT / ITEM NARRATIVE:
(1) FEE SIMPLE APPLICATION: SEA ISLAND PARKWAY TRACTS, BEAUFORT; POLITICAL JURISDICTION –
UNINCORPORATED BEAUFORT COUNTY; GEOGRAPHIC REGION – EASTERN (PURSUE DUE DILIGENCE)
(2) CONSERVATION EASEMENT APPLICATION: CHELSEA TRACTS, OKATIE; POLITICAL JURISDICTION -
UNINCORPORATED JASPER COUNTY; GEOGRAPHIC REGION – OUTSIDE OF COUNTY (PURSUE DUE
DILIGENCE)
FISCAL IMPACT:
Green Space Program Fund Account #4706-10-0000-54400:
1. For Sea Island Parkway Tracts - Up to $30,000 due diligence
2. For Chelsea Tracts – N/A
OPTIONS FOR COUNCIL MOTION:
Motion to approve, modify, or deny the recommendations of the Green Space Advisory Committee.
35
Item 9.
36
Item 9.
37
Item 9.
38
Item 9.
39
Item 9.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 11 ACRES LOCATED ON BURNT
CHURCH ROAD (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000) FROM T3
HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) TO T3 NEIGHBORHOOD (T3N)
MEETING NAME AND DATE:
Natural Resources Committee Meeting, May 5 , 2025
PRESENTER INFORMATION:
Robert Merchant, AICP, Director, Beaufort County Planning and Zoning
(10 minutes needed for item discussion)
ITEM BACKGROUND:
This rezoning application went before the Beaufort County Planning Commission at their April 7, 2025,
meeting. At that time, the Commission voted 5-2 to recommend approval of the proposed amendment to
County Council.
PROJECT / ITEM NARRATIVE:
The applicant is seeking to amend the zoning of three parcels that make up 11 acres. They are currently zoned
T3 Hamlet Neighborhood and T4 Hamlet Center, and the applicant is requesting a zoning amendment to T3
Neighborhood in order to accommodate 50 single-family homes. The current use is a non-conforming mobile
home park.
FISCAL IMPACT:
Not applicable
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval. The property is split zoned along current property lines. The current zoning does
not allow for consistent development across the properties.
OPTIONS FOR COUNCIL MOTION:
Motion to approve, modify, or deny the application as submitted;*
Approval of the application with a reduction in the area proposed to be rezoned;*
Approval of a rezoning to a more restricted base zone than requested in the application;* or
Denial of the application.*
*Council’s decision must be based on the standards in Section 7.3.40 C of the Community Development Code
(Attachment A to this AIS) and must clearly state the factors considered in making its decision and the basis or
rationale for the decision. (7.4.90 B.3). These factors are as follows:
1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of
this Development Code. In areas of new development, a finding of consistency with the
Comprehensive Plan shall be considered to meet the standards below, unless compelling evidence
demonstrates the proposed amendment would threaten the public health, safety, and welfare if the
land subject to the amendment is classified to be consistent with the Comprehensive Plan;
40
Item 10.
2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances;
3. Addresses a demonstrated community need;
4. Is required by changed conditions;
5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is
the appropriate zone and uses for the land;
6. Would not adversely impact nearby lands;
7. Would result in a logical and orderly development pattern;
8. Would not result in adverse impacts on the natural environment—including, but not limited to, water,
air, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the
environment; and
9. Would result in development that is adequately served by public facilities (e.g., streets, potable water,
sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and
fire and emergency medical facilities).
Attachment A.
CDC Section 7.3.40 B.7 Zoning Map Amendment (Rezoning) provides:
The County Council’s decision shall be based on the standards in Subsection 7.4.30 C and shall be
one of the following:
1. Approval of the application as submitted;
2. Approval of the application with a reduction in the area proposed to be rezoned;
3. Approval of a rezoning to a more restricted base zone than requested in the application;
4. Denial of the application.
CDC Section 7.3.40 C. Zone Map Amendment Review Standards.
The advisability of an amendment to the Official Zoning Map is a matter committed to the
legislative discretion of the County Council and is not controlled by any one factor. In determining
whether to adopt or deny a proposed Zone Map Amendment, the County Council shall weigh the
relevance of and consider whether and the extent to which the proposed amendment:
1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes
of this Development Code. In areas of new development, a finding of consistency with the
Comprehensive Plan shall be considered to meet the standards below, unless compelling
evidence demonstrates the proposed amendment would threaten the public health, safety, and
welfare if the land subject to the amendment is classified to be consistent with the Comprehensive
Plan;
2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances;
3. Addresses a demonstrated community need;
4. Is required by changed conditions;
5. Is compatible with existing and proposed uses surrounding the land subject to the application,
and is the appropriate zone and uses for the land;
6. Would not adversely impact nearby lands;
7. Would result in a logical and orderly development pattern;
41
Item 10.
8. Would not result in adverse impacts on the natural environment —including, but not limited to,
water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural
functioning of the environment; and
9. Would result in development that is adequately served by public facilities (e.g., streets, potable
water, sewerage, stormwater management, solid waste collection and disposal, schools, parks,
police, and fire and emergency medical facilities).
CDC Section 7.4.90 B.3 provides:
County Council’s decision shall clearly state the factors considered in making the decision and the
basis or rationale for the decision.
42
Item 10.
ORDINANCE 2025/________
AN ORDINANCE AMENDING THE ZONING MAP FOR 11 ACRES LOCATED ON
BURNT CHURCH ROAD (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039
000 0269 0000) FROM T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET
CENTER (T4HC) TO T3 NEIGHBORHOOD (T3N)
WHEREAS, the properties located at 1 Devonwood Dr, 3 Devonwood Ct, and 171 Burnt
Church Road (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000)
are currently zoned T3 Hamlet Neighborhood and T4 Hamlet Center; and
WHEREAS, the owners of the properties have requested to change the zoning of the
properties to T3 Neighborhood to accommodate 50 single-family homes; and
WHEREAS, the Beaufort County Comprehensive Plan Future Land Use designation is
Urban Use and calls for development that is compatible with the type and mix of land currently
found in the municipalities; and
WHEREAS, T3 Neighborhood achieves this as its primary intent is to reinforce
established neighborhoods and to maintain neighborhood stability in walkable urban areas; and
WHEREAS, the Beaufort County Planning Commission considered the request on April
7, 2025, voting 5-2 to recommend that County Council approve the request; and
WHEREAS, County Council now wishes to amend the zoning map to change the zoning
of the properties from T3 Hamlet Neighborhood and T4 Hamlet Center to T3 Neighborhood.
NOW, THEREFORE be it ordained by County Council in a meeting duly assembled as
follows:
To adopt an ordinance amending the zoning map for 11 acres (R600 039 000 1552 0000, R600
039 000 0056 0000, R600 039 000 0269 0000) located at 1 Devonwood Dr, 3 Devonwood Ct,
and 171 Burnt Church Road from T3 Hamlet Neighborhood and T4 Hamlet Center to T3
Neighborhood.
Ordained this ___ day of ______________, 2025
_________________________
Alice Howard, Chair
43
Item 10.
___________________________
Sarah Brock, Clerk to Council
44
Item 10.
45
Item 10.
CDPA-000047-2025– Devonwood Rezoning Page 1 of 4
TO: York Glover, Chair, Natural Resources Committee of County Council
FROM: Robert Merchant, AICP, Beaufort County Planning and Zoning Department
DATE: April 11, 2025
SUBJECT: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 11 ACRES
LOCATED ON BURNT CHURCH ROAD (R600 039 000 1552 0000, R600 039 000 0056
0000, R600 039 000 0269 0000) FROM T3 HAMLET NEIGHBORHOOD (T3HN) AND T4
HAMLET CENTER (T4HC) TO T3 NEIGHBORHOOD (T3N)
STAFF REPORT:
A. BACKGROUND:
Case No. CDPA-000047-2025
Owner: One Devonwood LLC, Joni Strickland, Lawrence Graves Jr
Applicant: Andrew Klosterman
Property Location: 1 Devonwood Dr, 3 Devonwood Dr, 171 Burnt Church Rd
District/Map/Parcel: R600 039 000 1552 0000, R600 039 000 0269 0000, R600
039 000 0056 0000
Property Size: 11 acres
Current Future Land Use Urban Mixed Use
Designation:
Current Zoning District: T3 Hamlet Neighborhood and T4 Hamlet Center
Proposed Zoning District: T3 Neighborhood
B. SUMMARY OF REQUEST: The applicant is proposing a rezoning of three parcels from T3HN
and T4HC to T3N to yield 50 single-family homes. The parcels currently contain a non-
conforming mobile home park.
MEMORANDUM
46
Item 10.
CDPA-000047-2025– Devonwood Rezoning Page 2 of 4
C. EXISTING ZONING: Currently two of the parcels are comprised of T3HN which is intended to
reinforce established neighborhoods, to maintain neighborhood stability and provide a
transition between the walkable neighborhood and rural areas. Also, two of the parcels are
comprised of T4HC which is intended to integrate appropriate, medium-density residential
building types, such as duplexes, townhouses, small courtyard housing, and mansion
apartments in an environment conducive to walking and bicycling.
D. PROPOSED ZONING: The proposed zoning of T3N is intended to provide a walkable,
predominantly single-family neighborhood that integrates compatible multi-family housing
types, such as duplexes and cottage courts within walking distance to transit and
commercial areas.
E. TRAFFIC IMPACT ANALYSIS (TIA): According to Section 6.3.20.D of the CDC, “An application
for a rezoning shall include a TIA where the particular project or zoning district may result in
a development that generates 50 trips during the peak hour or will change the level of
service of the affected street.” The application does not require a TIA.
F. ZONING MAP AMENDMENT REVIEW STANDARDS: In determining whether to adopt or
deny a proposed Zone Map Amendment, the County Council shall weigh the relevance of
and consider whether and the extent to which the proposed amendment:
1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and
the purposes of this Development Code;
Yes, it is consistent with the Comprehensive Plan. The future land use designation of
Urban Mixed Use calls for development that is compatible with the type and mix of land
currently found in the municipalities. This can be achieved through T3N as the district’s
primary intent is to reinforce established neighborhoods and to maintain neighborhood
stability in walkable urban areas per the CDC.
2. Is not in conflict with any provision of this Development Code, or the Code of
Ordinances;
Yes, it is not in conflict with the CDC.
3. Addresses a demonstrated community need;
No, it does not.
4. Is required by changed conditions;
No, it is not.
5. Is compatible with existing and proposed uses surrounding the land subject to the
application, and is the appropriate zone and uses for the land;
Yes, this rezoning is compatible with the surrounding area. This proposed zoning district
allows for primarily Single-Family homes with lower density Multi-family units. The
47
Item 10.
CDPA-000047-2025– Devonwood Rezoning Page 3 of 4
downzoning of the T4HC portion to T3N now limits the use of commercial along Burnt
Church Road and allows this area to be more residential as it transitions toward the May
River and Allyjoy Community.
6. Would not adversely affect nearby lands;
Yes, this would not adversely affect nearby lands as this rezoning will constitute in a
similar intensity of the existing development. The applicant is proposing 50 single-family
homes. Currently there is a mobile home park consisting of about 50 homes.
7. Would result in a logical and orderly development pattern;
Yes, see 5.
8. Would not result in adverse impacts on the natural environment – including, but not
limited to, water, air, noise, stormwater management, wildlife, vegetation, wetlands,
and the natural functioning of the environment:
Any development on the site would be required to adhere to the natural resource
protection, tree protection, wetland protection, and stormwater standards in the
Community Development Code and the Stormwater BMP Manual.
9. Would result in development that is adequately served by public facilities (e.g..
streets, potable water, sewerage, stormwater management, solid waste collection
and disposal, schools, parks, police, and fire and emergency medical facilities:
The school district and BJWSA have been notified. BJWSA stated that water and sewer is
available and the developer is aware of connections and capacity requirements.
G. STAFF RECOMMENDATION: Staff recommends approval. The property is split zoned along
current property lines. The current zoning does not allow for consistent development across
the properties. This rezoning is an upzoning for 6 acres and a downzoning for 5 acres.
H. PLANNING COMMISSION RECOMMENDATION: At their April 7, 2025 meeting, the Planning
Commission voted 5-2 recommending approval of the rezoning.
I. ATTACHMENTS
• Zoning Map (existing and proposed)
• Application
48
Item 10.
49
Item 10.
2712 Bull Street, Suite A • Beaufort, SC 29902
O: (843) 379-2222 F: (843) 379-2223
W W W . D A V I S F L O Y D . C O M
February 17, 2025
Mr. Rob Merchant, AICP
Beaufort County Planning and Zoning Director
PO Drawer 1228
Beaufort, South Carolina 29902
Re: Property Rezoning for Parcels R600-039-000-0056, 0269, and 1552
171 Burnt Church Road – Proposed 50 Lot Residential Subdivision
D|F Job Number: 32210.00
To whom it may concern,
Our client, Mr. Jimmy Yirka, is proposing to develop a new 50-lot residential subdivision in
downtown Bluffton located at 171 Burnt Church Road. The land is comprised of three parcels zoned
T4HNC and T3HN which currently contain a non-conforming mobile home park in disarray. The
three parcels have varied minimum lot and setback dimensions. To achieve a 50’ x 100’ minimum
lot size and Village House building type, we are requesting to rezone all three parcels to T3N. The
front two parcels totaling nearly 6 acres will be downzoned while the rear 5-acre parcel will be
upzoned. We believe this rezone would result in a net reduction of the overall density of the
development that would be allowed by-right, but is necessary to achieve a more consistent look
across the development and would eliminate the complexity of designing a subdivision on a dually
zoned property. T4HC allows a 50’ minimum lot size with a 10’ front and 5’ side setback. T3HN
allows a 65’ minimum lot width with a 25’ front and 10’ side setback. We believe rezoning all
parcels to T3N which allows for a 50’ minimum lot width with 15’ front and 7.5’ side yard setbacks
are an appropriate balance that would not disrupt the character of the surrounding communities and
fits with the intent of the zoning map and ordinance.
Included in this submittal are the Community Development Code (CDC) Zoning Map Amendment
Applications, and below are the responses to the questions listed on page 3 of the application.
Beaufort County Zoning Questions are shown in Black. Davis & Floyd Responses are in Blue.
1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the
purposes of this Development Code. In areas of new development, a finding of consistency with
the Comprehensive Plan shall be considered to meet the standards below, unless compelling
evidence demonstrates the proposed amendment would threaten the public health, safety, and
welfare if the land subject to the amendment is classified to be consistent with the
Comprehensive Plan:
- The goal of this rezoning is to apply a single zoning across 3 combined parcels. The current
parcels are classified as a mix of T4HC and T3HN. We are proposing a rezoning of the entire
50
Item 10.
171 Burnt Church Road
Page 2
parcel to T3N which is a fair balance of the two current zones. The proposed site will be in
compliance with the new T3N zoning.
2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances:
- There are no known conflicts with the Development Code or Code of Ordinances for rezoning of
this property.
3. Addresses a demonstrated community need:
- The goal of this project is to provide 50 single-family village houses in the heart of downtown
Bluffton. The houses are anticipated to serve middle income residents which we believe is
needed in the area. These houses will replace an existing non-conforming mobile home park
which we feel will be welcomed by the community.
4. Is required by changed conditions:
- The rezoning is required for this property to create a uniform code across the entire development
due to the current dual zoning standards.
5. Is compatible with existing and proposed uses surrounding the land subject to the application,
and is the appropriate zone and uses for the land:
- The current property is zoned for residential use and will be developed as a residential
neighborhood. There are several similar and larger sized residential communities in the
immediate area and we believe this project will be beneficial to all surrounding properties.
6. Would not adversely impact nearby lands:
- There are no adverse impacts to the nearby lands on this project. We feel removing the existing
mobile home park, which appears to be on septic, and replacing it with a new residential
community on public sewer is beneficial to all nearby lands.
7. Would result in a logical and orderly development pattern:
- The proposed site plan included in this submittal shows the layout based on the requested T3N
rezoning. As shown, having a uniform zoning across the site will result in a more consistent
development pattern and prevent a more scattered, mixed bag of development standards.
8. Would not result in adverse impacts on the natural environment—including, but not limited to,
water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural
functioning of the environment:
- There are no adverse impacts to the natural environment proposed on the site. The site will
utilize a stormwater pond and infiltration BMPs to comply with the SoLoCo manual and DES-
OCRM standards. As mentioned above, the existing site is somewhat in disarray, and we believe
are currently on septic tanks and drainfields which will all be removed. The new development
will be placed on BJWSA sewer by means of a new pump station and force main.
51
Item 10.
171 Burnt Church Road
Page 3
9. Would result in development that is adequately served by public facilities (e.g., streets, potable
water, sewerage, stormwater management, solid waste collection and disposal, schools, parks,
police, and fire and emergency medical facilities):
- The project is in the heart of downtown Bluffton where all the above-mentioned services are
readily available. The project would not have an adverse impact or create a burden on any of
these facilities.
If you have any questions, or need anything else for your review, please contact me at
(843) 379-2222 or at aklosterman@davisfloyd.com.
Yours truly,
Andrew Klosterman PE
Senior Project Manager
52
Item 10.
4
8
7
CIVIC SPACE6
2
3
1
23 22 21 20 19 18 91011121314
27
24
31
28
25
30
32 33 34 35
CIVIC SPACE51
53
49
52
48 47 4546
40
3836 3937
44
42
43
4150
FL
20' BUFFER
10' BUFFER (WITH SOLID FENCE)
10' BUFFER
10' BUFFER
POND OPEN SPACE
100.0
52.5
100.0
52.5
52.5
100.0
52.5
52.5
100.0
52.5
52.5
100.0
52.553.1
100.0
54.7
100.0
53.1
53.1
100.0
53.1
53.1100.0
53.1 55.5
100.0
100.0
50.0 100.0
50.0
50.012.2 100.0
10.150.0
100.0
49.6
100.0
48.9
17.032.6
100.0
32.816.1
50.0
100.0
50.0
51.34.5
100.1
8.0 51.3
61.8
100.0
59.3
100.0
50.0
100.0
50.0
100.0
62.914.9
15.861.4
100.0
50.0
50.0
100.0
29.220.8
22.527.5
100.0
50.0
50.0
37.8
39.9
100.0
57.5
100.0
55.4
100.0
50.0
50.0
100.0
50.0
50.0
100.0
50.0
50.018.840.3
100.0
38.718.8
100.0
50.0
100.0
50.950.0 100.0
50.0
50.0 100.0
50.0
50.0
100.0
50.0
50.0
50.0
71.9
100.0
69.8
50.0
100.0
50.0
50.0
100.0
50.0
13
33 11
2
8
332
8
2
3
ROAD A
ROAD B
ROAD B
ROAD CROAD C
ROAD DROAD D
ROAD E
ROAD EROAD E
ALLEY
ALLEY
ALLEY
ALLEY
ALLEYALLEY
ALLEY
ALLEY
ALLEY
ALLEY
ALLEY
50.0
100.0
50.0
61.7 38.3
100.0
50.0
50.0
100.0
50.0
100.0
50.0
50.0
64.735.3
50.0
100.0
52.2
100.0
50.0
100.0
50.0
50.0
100.0
50.0
50.0
100.0
50.0
50.0
100.0
50.0
50.0
100.0
50.0
50.0
100.0
50.0
70.0
100.040.0
40.0
40.0
50.0
100.0
50.015.0
50.0
100.0
50.0
50.0
100.0
50.0
50.0
100.0
50.0
50.0
100.0
50.0
50.0
100.0
50.0
53.7
100.0
52.2
CIVIC SPACE1617
5
6
9
5
29
26
ALLEY
15' FRONTSETBACK (TYP.)15' FRONTSETBACK (TYP.)
15' FRONTSETBACK (TYP.)
15' FRONTSETBACK (TYP.)
15' FRONTSETBACK (TYP.)
15' FRONTSETBACK (TYP.)
15' FRONTSETBACK (TYP.)
15' FRONTSETBACK (TYP.)
15' FRONTSETBACK (TYP.)
15' FRONTSETBACK (TYP.)
10' SIDE STREETSETBACK (TYP.)
10' SIDE STREETSETBACK (TYP.)
10' SIDE STREETSETBACK (TYP.)
10' SIDE STREETSETBACK (TYP.)
10' SIDE STREETSETBACK (TYP.)
10' SIDE STREETSETBACK (TYP.)
10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.)
10' SIDE STREETSETBACK (TYP.)10' SIDE STREETSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
5' REARSETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)
7.5' SIDE SETBACK (TYP.)15
OWNER
THESE DRAWINGS AND THE DESIGN THEREON ARE THE PROPERTY OF DAVIS & FLOYD, INC. AND MAY NOT BE USED IN WHOLE OR IN PART WITHOUT WRITTEN CONSENT OF THE ENGINEER / ARCHITECT AND ANY INFRINGEMENT WILL BE SUBJECT TO LEGAL ACTIONG:\JobsEven\32210-00\Production\Civil\Drawings\032210.00-SITE.dwg, 11/21/2024 3:08:28 PM, sawyer sorrow
PROJECT TITLE
DRAWING TITLENO. RELEASEDCHECKEDDATE
PAGEOF
CHECKED
DESIGNED
JOB NO.
DRAWN
APPROVED
DATE
2712 BULL STREET, SUITE ABEAUFORT, SOUTH CAROLINA 29902(843) 379-2222
SITE PLANCAROLINA INVESTMENTSBLUFFTON, SOUTH CAROLINA 29910
171 BURNT CHURCH ROAD - LOTRESIDENTIAL COMMUNITY
7C20021MSSMSS
ARKWLR
JULY 31, 202432210.001ISSUED TO BJWSAARK07/31/2024
PROJECT DATUM INFORMATION: HORIZONTAL DATUM: NAD 83VERTICAL DATUM: NAVD88
0040'80' SCALE: 1" = 40'
R
Know what'sbelow.before you dig.Call
SOUTH CAROLINACERTIFICATE OF AUTHORIZATIONDAVIS &FLOYD, INCNo. C00538
SOUTH CAROLINA
LICENSED PROFESSIONAL ENGINEERANDREW R. KLOSTERMANNo. 2823007/31/2024NOT FOR CONSTRUCTION
SITE LEGENDCENTERLINE
FENCELINEXXXXXXX CURBCURB AND GUTTER
A.D.A. RAMP WITHDETECTABLE WARNINGS
WHEEL STOPA.D.A. PARKING AND SIGNAGESIGNSTOP BAR(PAVEMENT MARKING)DIRECTIONAL ARROW(PAVEMENT MARKING)
RETAINING WALL^^^^^^
PROPOSED CONCRETEPROPOSED HEAVY-DUTYCONCRETE
PROPOSED HEAVY-DUTYASPHALT
SITE LIGHTING FIXTURES
PROPOSED LIGHT-DUTYASPHALT
ONLY SIGN(PAVEMENT MARKING)ONLYPOINT OF INFLECTION
N
STATEPLANE
SITE PLAN NOTES1.REFER TO GENERAL NOTES, SPECIFICATIONS, AND SCOPE OF WORK.2.ALL PUBLIC RIGHT-OF-WAYS AND ALL AMENITIES SHALL BE ADA COMPLIANT.3.EXISTING ADA ACCESSIBLE PUBLIC RIGHT-OF-WAYS MUST REMAIN ADA COMPLIANT DURINGCONSTRUCTION OR AN ALTERNATIVE ROUTE MUST BE PROVIDED.4.REFER TO LANDSCAPE PLANS FOR HARDSCAPE, FENCING, AND PLANTING DETAILS.5.ALL DIMENSIONS SHOWN ARE TO FACE OF CURB. TYPICAL CURB WIDTH IS 0.5'. WHERE NOCURB IS EXISTING OR PROPOSED, DIMENSIONS SHOWN ARE TO THE EDGE OF PAVEMENT.
CURRENT ZONING:
T4HC (HAMLET CENTER)
SETBACKS
FRONT: 10' MIN
SIDE: 5' MIN
SIDE STREET: 10' MIN
REAR: 5' MIN
LOT SIZE
WIDTH: 50' MIN
DEPTH: 75' MIN
CURRENT ZONING:
T3HN (HAMLET NEIGHBORHOOD)
SETBACKS
FRONT: 25' MIN
SIDE: 10' MIN
SIDE STREET: 15' MIN
REAR: 15' MIN
LOT SIZE
WIDTH: 65' MIN
DEPTH: 100' MIN
HAMLET CENTER (T4HC)
HAMLET NEIGHBORHOOD (T3HN)
REZONE ALL PARCELS TO:
T3N (NEIGHBORHOOD)
SETBACKS
FRONT: 15' MIN
SIDE: 7.5' MAIN BLDG MIN; 5' ANCILLARY
BLDG MIN.
SIDE STREET: 10' MIN
REAR: 15' MAIN BLDG MIN; 5' ANCILLARY
BLDG MIN.
LOT SIZE
WIDTH: 50' MIN, 100' MAX
DEPTH: 100' MIN, 200' MAX
R600 039 000 1552 0000
ONE DEVONWOOD LLC
1.01 ACRES
R600 039 000 0056 0000
GRAVES, LAWERENCE EARL JR
TRUSTEE
5.00 ACRES
R600 039 000 0269 0000
STRICKLAND, JONI
LEWIS
5.04 ACRES
53
Item 10.
54
Item 10.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 86.56 ACRES LOCATED AT 98
JENNINGS ROAD (R100 028 000 0264 0000) FROM T2 RURAL (T2R) TO T3 HAMLET NEIGHBORHOOD (T3HN)
AND T4 HAMLET CENTER (T4HC) UTILIZING THE HAMLET PLACE TYPE OVERLAY (PTO)
MEETING NAME AND DATE:
Natural Resources Committee Meeting, June 2 , 2025
PRESENTER INFORMATION:
Robert Merchant, AICP, Director, Beaufort County Planning and Zoning
(10 minutes needed for item discussion)
ITEM BACKGROUND:
This rezoning application went before the Beaufort County Planning Commission at their May 5, 2025,
meeting. At that time, the Commission voted 7-1 to recommend denial of the proposed amendment to County
Council. It was stated that the application failed to meet standards 1,4,5, and 7.
A previous request to rezone to the C3 district was denied in May 2024; this request was to accommodate 184
single-family units.
PROJECT / ITEM NARRATIVE:
The applicant is seeking to amend the zoning of an 86-acre parcel. It is currently zoned T2 Rural, and the
applicant is requesting a zoning amendment to T4 Hamlet Center and T3 Hamlet Neighborhood to
accommodate 244 units comprised of single family detached and townhomes. The applicant has expressed the
desire to enter a Development Agreement with County Council to provide 10 workforce housing units with
closing credit up to $2,500 and $750 per unit toward rehabilitation for structures in the “vicinity” of the
proposed development. The applicant also has expressed a desire to alter district standards in the DA.
FISCAL IMPACT:
Not applicable
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval with the condition that the Development Agreement does not alter any district
standards and that more affordable housing is offered.
OPTIONS FOR COUNCIL MOTION:
Motion to approve, modify, or deny the application as submitted;*
Approval of the application with a reduction in the area proposed to be rezoned;*
Approval of a rezoning to a more restricted base zone than requested in the application;* or
Denial of the application.*
*Council’s decision must be based on the standards in Section 7.3.40 C of the Community Development Code
(Attachment A to this AIS) and must clearly state the factors considered in making its decision and the basis or
rationale for the decision. (7.4.90 B.3). These factors are as follows:
55
Item 11.
1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of
this Development Code. In areas of new development, a finding of consistency with the
Comprehensive Plan shall be considered to meet the standards below, unless compelling evidence
demonstrates the proposed amendment would threaten the public health, safety, and welfare if the
land subject to the amendment is classified to be consistent with the Comprehensive Plan;
2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances;
3. Addresses a demonstrated community need;
4. Is required by changed conditions;
5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is
the appropriate zone and uses for the land;
6. Would not adversely impact nearby lands;
7. Would result in a logical and orderly development pattern;
8. Would not result in adverse impacts on the natural environment—including, but not limited to, water,
air, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the
environment; and
9. Would result in development that is adequately served by public facilities (e.g., streets, potable water,
sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and
fire and emergency medical facilities).
Attachment A.
CDC Section 7.3.40 B.7 Zoning Map Amendment (Rezoning) provides:
The County Council’s decision shall be based on the standards in Subsection 7.4.30 C and shall be
one of the following:
1. Approval of the application as submitted;
2. Approval of the application with a reduction in the area proposed to be rezoned;
3. Approval of a rezoning to a more restricted base zone than requested in the application;
4. Denial of the application.
CDC Section 7.3.40 C. Zone Map Amendment Review Standards.
The advisability of an amendment to the Official Zoning Map is a matter committed to the
legislative discretion of the County Council and is not controlled by any one factor. In determining
whether to adopt or deny a proposed Zone Map Amendment, the County Council shall weigh the
relevance of and consider whether and the extent to which the proposed amendment:
1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes
of t his Development Code. In areas of new development, a finding of consistency with the
Comprehensive Plan shall be considered to meet the standards below, unless compelling
evidence demonstrates the proposed amendment would threaten the public health, safety , and
welfare if the land subject to the amendment is classified to be consistent with the Comprehensive
Plan;
2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances;
3. Addresses a demonstrated community need;
4. Is required by changed conditions;
5. Is compatible with existing and proposed uses surrounding the land subject to the application,
and is the appropriate zone and uses for the land;
56
Item 11.
6. Would not adversely impact nearby lands;
7. Would result in a logical and orderly development pattern;
8. Would not result in adverse impacts on the natural environment —including, but not limited to,
water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural
functioning of the environment; and
9. Would result in development that is adequately served by public facilities (e.g., streets, potable
water, sewerage, stormwater management, solid waste collection and disposal, schools, parks,
police, and fire and emergency medical facilities).
CDC Section 7.4.90 B.3 provides:
County Council’s decision shall clearly state the factors considered in making the decision and the
basis or rationale for the decision.
57
Item 11.
REZONING REQUESTS
I MOVE THAT WE GRANT/(DENY) THE REQUEST FOR REZONING FOR THE
FOLLOWING REASONS (STATE ALL THAT SUPPORT YOUR MOTION).
THE REQUEST:
1. IS/ (IS NOT) CONSISTENT WITH THE GOALS AND POLICIES OF THE
COMPREHENSIVE CODE AND THE PURPOSES OF THE DEVELOPMENT
CODE; ____
2. IS (NOT/IS) IN CONFLICT WITH PROVISIONS OF THE DEVELOPMENT
CODE AND OR OUR CODE OF ORDINANCES; _
3. DOES/ (DOES NOT) ADDRESS A DEMONSTRATED COMMUNITY NEED; _____
4. IS/ (IS NOT) REQUIRED BY CHANGED CONDITIONS; _
5. IS/ (IS NOT) COMPATIBLE WITH EXISTING AND PROPOSED USE OF LAND
SURROUNDING THIS LAND; ____
6. WOULD NOT/ (WOULD) ADVERSELY AFFECT NEARBY LAND;
7. WOULD/ (WOULD NOT) RESULT IN LOGICAL AND ORDERLY
DEVELOPMENT PATTERNS; ___
8. WOULD NOT/ (WOULD) RESULT IN ADVERSE IMPACT ON THE NATURAL
ENVIRONMENT (WATER, AIR, NOISE, STORMWATER MANAGEMENT,
WILDLIFE, VEGITATION, WETLANDS, AND THE NATURAL FUNCTIONING
OF THE ENVIRONEMENT); _______
9. WOULD/ (WOULD NOT) RESULT IN DEVELOPMENT THAT IS ADEQUATELY
SERVED BY PUBLIC FACILITITES (STREETS, POTABLE WATER, SEWER,
STORMWATER MANAGEMENT, SOLID WASTE COLLECTION AND
DISPOSAL, SCHOOLS, PARKS, POLICE, FIRE, EMERGENCY MEDICAL
FACILITIES). _ _ _
58
Item 11.
ORDINANCE 2025/________
AN ORDINANCE AMENDING THE ZONING MAP FOR 86.56 ACRES
LOCATED AT 98 JENNINGS ROAD (R100 028 000 0264 0000) FROM T2 RURAL (T2R)
TO T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC)
UTILIZING THE HAMLET PLACE TYPE OVERLAY (PTO)
WHEREAS, the property located at 98 Jennings Road (R100 028 000 0264 0000) is
currently zoned T2 Rural; and
WHEREAS, the applicant has requested to change the zoning of the property to T4
Hamlet Center and T3 Hamlet Neighborhood utilizing a Hamlet Place Type Overlay; and
WHEREAS, the Beaufort County Comprehensive Plan encourages high quality
development in walkable urban nodes as opposed to low density sprawl and designates this site
as a location to implement a Hamlet Place Type; and
WHEREAS, the Beaufort County Planning Commission considered the request on May
5, 2025, voting 7-1 to recommend that County Council deny the request; and
WHEREAS, County Council now wishes to amend the zoning map to change the zoning
of the property from T2 Rural to T4 Hamlet Center and T3 Hamlet Neighborhood.
NOW, THEREFORE be it ordained by County Council in a meeting duly assembled as
follows:
To adopt an ordinance amending the zoning map for 86.56 acres (R100 028 000 0264 0000)
located at 98 Jennings Road from T2 Rural to T4 Hamlet Center and T3 Hamlet Neighborhood
utilizing the Hamlet Place Type Overlay.
Ordained this ___ day of ______________, 2025
_________________________
Alice Howard, Chair
___________________________
Sarah Brock, Clerk to Council
59
Item 11.
60
Item 11.
CDPA-000048-2025– 98 Jennings Rezoning Page 1 of 5
TO: York Glover, Chair, Natural Resources Committee of County Council
FROM: Robert Merchant, AICP, Beaufort County Planning and Zoning Department
DATE: May 9, 2025
SUBJECT: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 86.56 ACRES
LOCATED AT 98 JENNINGS ROAD (R100 028 000 0264 0000) FROM T2 RURAL (T2R) TO
T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) UTILIZING THE
HAMLET PLACE TYPE OVERLAY (PTO)
STAFF REPORT:
A. BACKGROUND:
Case No. CDPA-000048-2025
Owner: Claire Nitze
Applicant: Josh Tiller
Property Location: 98 Jennings Rd
District/Map/Parcel: R100 028 000 0264 0000
Property Size: 86 acres
Current Future Land Use Neighborhood Mixed-Use with Hamlet PTO
Designation:
Current Zoning District: T2 Rural
Proposed Zoning District: T3 Hamlet Neighborhood and T4 Hamlet Center
B. SUMMARY OF REQUEST: The applicant previously requested a rezoning of the property to
C3 to potentially accommodate 184 single-family dwelling units. The staff recommendation
at that time was for denial due to it not being a Place Type. It went before the Planning
Commission on March 4, 2024, with a unanimous vote of denial, Land Use Committee April
8, 2024, with a unanimous vote of denial, and one reading of County Council on May 13,
2024 with a 7-2 vote of denial. Per Section 7.4.100, if a development application requiring a
public hearing is denied, no application proposing the same or similar development on all or
MEMORANDUM
61
Item 11.
CDPA-000048-2025– 98 Jennings Rezoning Page 2 of 5
part of the same land shall be submitted within one year after the date of denial. However,
the applicant is now submitting a Place Type Overlay which is not considered a similar
development. The applicant is requesting a rezoning from T2R to T3HN and T3HC to yield
244 dwelling units consisting of single-family detached and townhomes.
The applicant has expressed interest in working with County Council on a Development
Agreement that would be approved concurrently with this zoning amendment. The
applicant has provided a draft attached; however, it is important to note that Council has
not begun any review nor negotiation to date with respect to this Development Agreement.
The applicant has expressed an interest in providing 10 units for workforce housing capped
at 80-120% of AMI ($80,700-$127,700) with a closing credit/down payment assistance of up
to $2,500 for those purchasing under the workforce housing process. The developer also
agrees to provide up to $750 per unit toward rehabilitation of existing local structures in the
vicinity of the development. The number of structures, the process, and the “vicinity” have
yet to be stated.
The applicant has expressed the desire to use the Development Agreement to vary from the
CDC’s architectural standards. The South Carolina Local Government Development
Agreement Act states “a development agreement and authorized development must be
consistent with the local government's comprehensive plan and land development
regulations.” Development Agreements are not meant to relax the design standards that
are integral to the character that the districts are meant to facilitate.
On April 7th, 2025, the applicant requested a deferral in order to address staff’s concerns of
the Regulating Plans. The applicant has since addressed all comments including transect
organization, civic space type/features, and addressed the cross-section where this
development fronts Jennings Road.
C. EXISTING ZONING: The lot is currently zoned T2 Rural (T2R), which permits residential
development at a density of one dwelling unit per three acres; this site could yield 27
homes maximum. T2 Rural also permits very limited non-residential uses. A portion of this
parcel is located in Noise Zone 1 which requires notification to the Marine Corps Air Station;
this portion is proposed civic space.
D. PROPOSED ZONING: Through the utilization of a Hamlet Place Type, the applicant is
proposing T3HN and T4HC. T3HN is intended to reinforce established neighborhoods, to
maintain neighborhood stability and provide a transition between the walkable
neighborhood and rural areas. T4HC is intended to integrate appropriate, medium-density
residential building types, such as duplexes, townhouses, small courtyard housing, and
mansion apartments in an environment conducive to walking and bicycling.
E. TRAFFIC IMPACT ANALYSIS (TIA): According to Section 6.3.20.D of the CDC, “An application
for a rezoning shall include a TIA where the particular project or zoning district may result in
62
Item 11.
CDPA-000048-2025– 98 Jennings Rezoning Page 3 of 5
a development that generates 50 trips during the peak hour or will change the level of
service of the affected street.”
The Ramsey Farms TIA is complete and has been approved. Of the several intersections
studied, mitigation will be required at WK Alston and Broad River Boulevard because the
Level of Service (LOS) of this intersection falls below the County’s TIA ordinance standard of
LOS D. The degradation of the LOS of this intersection is due to the adjacency of other
approved developments including Ramsey Farms. Therefore, the methodology for funding
and implementing the recommended mitigation measure will be determined by the County
prior to the issuance of occupancy permits.
F. ZONING MAP AMENDMENT REVIEW STANDARDS: In determining whether to adopt or
deny a proposed Zone Map Amendment, the County Council shall weigh the relevance of
and consider whether and the extent to which the proposed amendment:
1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and
the purposes of this Development Code;
Yes, a rezoning of this property implementing the Hamlet PTO is the future land
designation of this parcel.
2. Is not in conflict with any provision of this Development Code, or the Code of
Ordinances;
Yes, it is not in conflict.
3. Addresses a demonstrated community need;
The applicant has indicated through the Development Agreement to implement 10 units
for workforce housing with a closing credit/down payment assistance of up to $2,500.
The developer also agrees to provide up to $750 per unit toward rehabilitation of
existing local structures in the vicinity of the development. The provision of Workforce
Housing is a goal of the Comprehensive Plan.
4. Is required by changed conditions;
No, it is not.
5. Is compatible with existing and proposed uses surrounding the land subject to the
application, and is the appropriate zone and uses for the land;
The character of the surrounding area is rural residential; however, it is in proximity to
Battery Creek High School and Mint Farms, a similar single-family residential subdivision.
6. Would not adversely affect nearby lands;
The TIA states that the proposed rezoning would generate the following peak hour trips:
152 AM PEAK, 155 SCHOOL PM PEAK, and 201 PM PEAK.
63
Item 11.
CDPA-000048-2025– 98 Jennings Rezoning Page 4 of 5
7. Would result in a logical and orderly development pattern;
Yes, the regulating plan places the higher density district along Jennings Road which
places it in closest proximity to Battery Creek High School.
8. Would not result in adverse impacts on the natural environment – including, but not
limited to, water, air, noise, stormwater management, wildlife, vegetation, wetlands,
and the natural functioning of the environment:
Any development on the site would be required to adhere to the natural resource
protection, tree protection, wetland protection, and stormwater standards in the
Community Development Code and the Stormwater BMP Manual.
9. Would result in development that is adequately served by public facilities (e.g..
streets, potable water, sewerage, stormwater management, solid waste collection
and disposal, schools, parks, police, and fire and emergency medical facilities:
The School District, Air Station, and BJWSA have been notified.
G. STAFF RECOMMENDATION:
Staff recommends approval under the conditions that the applicant work with County Council
through a Development Agreement to best determine the need for affordable housing in the
area. This process would need to ensure more affordable units at a cost obtainable to
neighboring residents of the community. It is recommended that no alterations to the
standards be allowed in the Development Agreement.
H. PLANNING COMMISSION RECOMMENDATION:
At their May 5, 2025, meeting, the Planning Commission made a motion to recommend
approval of the application with the conditions set forth in the staff report’s Staff
Recommendation. The motion failed 2-6. A motion was made to recommend denial of the
application based on the review standards 1,4,5 and 7 not being met. The motion passed 7-1.
I. ATTACHMENTS
• Zoning Map (existing and proposed)
• Application
• TIA
• Development Agreement
64
Item 11.
T2R
C3NMU
C3NMU
T3HN
T4HC
C3NMU
C3NMUC3NMU
C5RCMU
RAMSEY RD
JENNINGS RD
DRAFTS WAY
RIVERSHILL
RD
APPLEMINT LN
CALICO CT
ALEXANDER WAY
POSSUM HILL RD
BLUE DOLPHIN DR
OUTREACH LN
RAMSEY RD
JENNINGS RD
DRAFTS WAY
RIVERS
HILLRD
CALICO CT
GLAZE DR
ALEXANDER WAY
RAMBLIN R D
BLUE DOLPHIN DR
POSSUM
HILLRD
OUTREACH LNTHOMASINA DR
RAMSE Y LOOP
T2R
C3NMU
C3NMU
C3NMU
C3NMU
T2R
Legend
R100 28 264
Zone Districts
FBCode
Buckingham Landing Community Preservation[BLCP]
C3 Neighborhood Mixed Use [C3NMU]
C4 Community Center Mixed Use [C4CCMU]
C5 Regional Center Mixed Use [C5RCMU]
May River Community Preservation [MRCP]
Existing Planned Unit Development [PUD]
T1 Natural Preserve [T1NP]
T2 Rural [T2R]
T2 Rural Center [T2RC]
T2 Rural Neighborhood [T2RN]
T3 Edge [T3Edge]
T3 Hamlet Neighborhood [T3HN]
T3 Neighborhood [T3N]
T4 Hamlet Center [T4HC]
T4 Hamlet Center Open [T4HCO]
T4 Neighborhood Center [T4NC]
Existing Zoning
Proposed Zoning
Legend
R100 28 264
FBCode
Buckingham Landing Community Preservation[BLCP]
C3 Neighborhood Mixed Use [C3NMU]
C4 Community Center Mixed Use [C4CCMU]
C5 Regional Center Mixed Use [C5RCMU]
May River Community Preservation [MRCP]
Existing Planned Unit Development [PUD]
T1 Natural Preserve [T1NP]
T2 Rural [T2R]
T2 Rural Center [T2RC]
T2 Rural Neighborhood [T2RN]
T3 Edge [T3Edge]
T3 Hamlet Neighborhood [T3HN]
T3 Neighborhood [T3N-O]
T4 Hamlet Center [T4HC]
T4 Hamlet Center Open [T4HCO]
T4 Neighborhood Center [T4NC]
R600 022 000 011A 0000
65
Item 11.
181 Bluffton Road Suite B104 Bluffton, South Carolina 29910
Voice: 843.815.4800 jktiller@jktiller.com Fax: 843.815.4802
Comprehensive Land Planning ■ Landscape Architecture
ZONING MAP AMENDMENT NARRATIVE
FOR
A REQUEST FOR REVIEW OF APPLICATION FOR THE ZONING MAP AMENDMENT
BY
Ramsey Farm LP
(Claire Nitze)
CONCERNING
98 Jennings Rd
(R100 028 000 0264 0000)
BEAUFORT COUNTY, SOUTH CAROLINA
This project narrative is submitted to the Beaufort County Planning Department as a portion of
an application for Zoning Map Amendment of the Ramsey Farm LP’s (“Owner”) property at 98
Jennings Road, currently zoned Rural T2R. This narrative is submitted to the Beaufort County
Planning Commission and the Beaufort County Council to explain the request and describe how
the Application meets the criteria of the Section 7.3.50 [Place Type Overlay (Rezoning)] of the
Community Development Code (“CDC”) and to explain the reason(s) for the zoning request as
required by the Application for rezoning.
Our foremost goal is to ensure that Beaufort County residents have access to affordable entry-
level housing. To support this, a separate Development Agreement is being prepared in
collaboration with the county and the Beaufort Jasper Housing Trust to establish the framework
and details for this initiative. The agreement's details will be finalized through negotiations with
county staff and the County Council’s Community Services and Land Use Committee prior to
the PTO’s first reading at County Council.
I. NARRATIVE
a. Introduction, Background, and Request
The Property located at 98 Jennings Road is an approximately 86.56 acre parcel
of real property identified by Beaufort County Tax map number R100 028 000
0264 0000, (“Property”), currently zoned Rural Neighborhood (T2R), located
within the unincorporated Beaufort County and bounded to the south by several
vacant and residential parcels that are zoned Neighborhood Mixed-Use (C3NMU),
to east by Ramsey Road, to the west by Jennings Road, and to the north several
parcels zoned Rural (T2R). The property is accessed from both Ramsey and
Jennings Roads.
66
Item 11.
2
The existing 86.56 acre property has been used to farm planted pines over the
years. Of the 86.56 acres, approximately 5.1 acres are wetlands, the largest of
which occupies the southeast corner of the property.
The property owner is seeking a rezoning to a Hamlet Place Type designation of
the Place Type Overlay (PTO), consisting of T4 Hamlet Center (T4HC- 36%) and
T3 Hamlet Neighborhood (T3HN- 64%), aligning with the Comprehensive Plan.
This parcel meets the minimum 80 Acre site requirement for the Hamlet Place
Type designation in the Beaufort County Community Development Code.
Additionally, PTO is compatible C3NMU zoning of adjacent parcels to the
southwest, south, and east. This proposal is in line with the Comprehensive Plan's
Future Land Use Map, designating the area as Neighborhood Mixed-Use,
consistent with the existing zoning of neighboring properties to the north and west
of the parcel. The expansion of mixed-use development is intended to diversify
commercial and residential options, fostering a centralized development that
bolsters employment opportunities while preserving the rural character of northern
Beaufort County. (See Attached Transect Regulating Plan, PTO Regulating Plan,
and Natural Resources, Wetlands, & Civic Space Plan)
Furthermore, there is a likelihood that the property will be developed for single-
family residential use, catering to the housing needs of Marine Corps Air Station
families by offering entry-level housing options.
Streets and alleys will be privately owned. All streets will be based on the
Neighborhood Edge Street standards. All alleyways will have a 20’ ROW and 14’
travel lane. The eastern side of Jennings road will meet the standards for the
Neighborhood Edge Street “Local” if permitted by the SCDOT. (See attached
Thoroughfare Standards Exhibit and Jennings Road Street Section Exhibit)
67
Item 11.
3
The Owner submits this Application requesting the approval of:
An amendment to the County’s Zoning Map designating the Property with the
zoning district of Hamlet Place Type designation of the Place Type Overlay zoning
with land uses described listed in the CDC Division 3.4.80 and illustrated in the
68
Item 11.
4
attached Transect Regulating Plan and PTO Regulating Plan.
II. REZONING CRITERIA
a. Applicability. The current zoning for the Property is Rural Neighborhood (T2R).
The proposed amendment requests designating Hamlet Place Type of the Place
Type Overlay District. This designation is in keeping with the Beaufort County
Comprehensive Plan’s provision that the PTO shall be used when the property is
upzoned. Hamlets are typically larger and more intense than rural crossroads
and are often located at the edge of the rural and urban condition. A hamlet often
has a small, pedestrian-oriented main street with surrounding and supporting
residential fabric that is scaled to the size of a pedestrian shed. The main street
and surrounding residential fabric transitions quickly into agricultural uses and/or
the natural environment.
b. Application Review Criteria. [CDC Division 7.3.50 – Place Type Overlay
(Rezoning) Review Standards]. The Owner proposes that this Application
satisfies or exceeds the requirements for a Zoning Map Amendment as set forth
below.
c. Consistency with the 2040 Beaufort County Comprehensive Plan
i. NATURAL ENVIRONMENT – The distinctive charm of Beaufort County
is closely tied to its abundant natural resources. The county is
committed to maintaining a harmonious equilibrium between human
activities and the preservation of its natural environment. Any potential
69
Item 11.
5
redevelopment will align with the Comprehensive Plan's objectives,
specifically focusing on Water Quality and Quantity, Habitat
Preservation and Protection, Environmental Education and Outreach
with the Public, and the promotion of Sustainable Development.
Presently utilized as a pine plantation, the property has undergone
clear-cutting and replanting cycles over the past few decades . The
development of the parcel will not result in adverse impacts to the
natural environment or cause detrimental effects to the surrounding
natural ecosystem.
ii. CULTURE– Preserving and safeguarding Beaufort County's rich cultural
heritage and history remains a top priority for the county. It is crucial to
acknowledge evolving socio- economic and cultural trends while actively
promoting the arts. The proposed amendment aligns with the Cultural
Resources element of the Comprehensive Plan, underscoring the
county's commitment to these objectives.
The military presence in the area significantly influences the local
economy. Given the site's proximity to the Marine Corps Air Station, the
proposed rezoning presents a valuable opportunity to expand housing
options for service members' families. This strategic rezoning initiative
aims to address the housing needs of Beaufort County's diverse
population, contributing to a more inclusive and thriving community.
iii. ECONOMY – The Comprehensive Plan underscores the importance of
enhancing options for entry -level housing to address the diverse
economic needs essential for sustaining the vitality of Beaufort County's
community. Instead of solely focusing on attracting new businesses and
industries to diversify the tax base, the establishment of entry -level
housing opportunities aims to provide housing that supports the
County's growing economies. This is achieved by strengthening and
expanding the business tax base while simultaneously creating quality,
value-added housing options for residents.
Within the framework of the Comprehensive Plan, a key objective is to
ensure a sufficient supply of appropriately located land zoned for a
Hamlet. This strategic allocation aims to promote the economic well -
being and diversity of the region. Additionally, the Economy component
of the Comprehensive Plan advocates for the planning, development,
and permitting of PTO developments tailored to appeal to young
professionals and military families .
In this context, the rezoning to Place Type Overlay (Hamlet Place Type
designation) offers an opportunity to extend and diversify the
predominantly rural residential tax base. The focus shifts towards
accommodating the housing needs of the workforce, thereby creating a
more resilient and inclusive foundation for Beaufort County's economic
sustainability.
iv. MOBILITY – In the realm of urban planning, careful consideration is
given to aspects such as land use development, mobility, public safety,
infrastructure costs, environmental conservation, and the visual and
70
Item 11.
6
economic appeal of neighborhoods and communities. The tangible
consequences of new growth, particularly in terms of diminished quality
of life due to traffic congestion, underscore the importance of
comprehensive planning. The introduction of the Place Type Overlay
zoning, allowing for mix of residential options, not only promotes local
and diverse housing options but also serves to curtail extensive vehicle
travel, thereby safeguarding road capacity.
Moreover, this zoning initiative goes beyond by incorporating measures
to enhance interconnectivity, introducing a secondary street
infrastructure that strategically improves traffic impacts. By facilitating
smoother traffic flow, these additional enhancements contribute to an
overall improvement in the livability and functionality of neighborhoods.
Additionally, the rezoning effort enables the establishment of housing in
closer proximity to employment centers, ensuring greater accessibility
for future residents and fostering a more sustainable and interconnected
urban environment.
v. HOUSING – With the uptick in housing prices and a trend reflecting the
migration of affluent retirees to the area, housing accessibility is
becoming an increasing priority. Under the proposed zoning, suitable
entry-level housing can be provided near employment opportunities. The
allowed residential uses under the proposed zoning address barriers to
housing accessibility, as recommended in the Comprehensive Plan. The
option to provide entry -level housing on this site would mean that the
County can more easily protect and preserve the family compounds
prevalent in the rural areas of Northern Beaufort County.
vi. COMMUNITY FACILITIES – County departments offer a range of
services, encompassing General Government, Detention Center,
Emergency Management, EMS, Libraries, Park and Recreations, as well
as Solid Waste/ Recycling. The suggested rezoning to Place Type
Overlay (PTO) is anticipated to have no adverse effects on the mission
and objectives of community facilities. Given the property's existing
management under pine plantation, it already accommodates many of
these services. Any alterations in land use resulting from the rezoning
are expected to balance the demand by augmenting the tax revenue
base. Additionally, it's worth noting that the local schools near the parcel
currently operate under capacity.
vii. BUILT ENVIRONMENT – Effective land use planning serves as the
cornerstone for all redevelopment initiatives within the County, ensuring
a balanced and sustainable distribution of various land use categories to
meet both present and future community needs. Looking ahead, growth
management will persistently prioritize redevelopment, employing
innovative strategies to adapt to unique conditions. The identified parcel
and its adjacent area are designated as "Neighborhood Mixed-Use"
and/or “Place Type Overlay” on the Future Land Use Map of the
Comprehensive Plan. The current property usage falls short of aligning
with the standards of neighboring development, impacting quality of life
and limiting diverse housing opportunities. The proposed rezoning aims
to expand the range and diversity of existing land uses in the vicinity.
71
Item 11.
7
The Comprehensive Plan indicates that the average population growth
in this area is driven by individuals seeking retirement and economic
opportunities. The relocating population tends to be well -educated,
affluent, and residing in smaller households. Projections in the
Comprehensive Plan foresee substantial residential growth in Northern
Beaufort County, particularly in this section. Recent population trends
validate these expectations. The Comprehensive Plan recommends
strategies focused on creating walkable communities with a variety of
housing options. The Place Type Overlay zoning, as outlined in the
2040 Beaufort County Atlas, facilitates high -quality, moderately dense
residential development, incorporating denser zones for multi -family and
mixed-use structures to promote walkability and affordable housing
choices. Design requirements aim to cultivate a suburban character
while encouraging both pedestrian and automobile access.
viii. FOCUSED PLANNING AREAS – This parcel is situated within the
Beaufort & Port Royal Planning Areas. The adoption of the 2020
Beaufort County Comprehensive Plan, in conjunction with the Port
Royal Comprehensive Plan, presented an opportunity to establish
unified planning principles. In the Beaufort & Port Royal Focal Area,
particular attention should be given to the redesign of roads for
enhanced safety, multimodal accessibility, and a human- scaled
environment. Prioritizing plans for a Palmetto Breeze trolley service
connecting Port Royal and Downtown Beaufort is crucial, as it would
significantly contribute to mobility and a cohesive sense of place.
For growth management west of Port Royal, guidance should be derived
from Place Types influenced by the Greenprint Overlay Map, the
existing transportation network, and the potential integration of a trolley
service. Introducing a new Town Place Type along Parris Island
Gateway is proposed to create a walkable destination and residential
space, fostering a distinct sense of place and identity for this specific
County area.
Successful execution of the Port Royal and Beaufort County plans relies
on joint planning, cooperation, an annexation strategy, and shared
standards for development and infrastructure services. As outlined in
the Comprehensive Plan for the Beaufort & Port Royal Planning Area,
the recommended future land use for this parcel is Place Type Overlay
zoning.
d. Is not in conflict with any provision of this Development Code, or the Code of
Ordinances. The Property is designated, according to the Future Land Use Map.
In compliance with an upzoning of the property, the PTO is compatible and
consistent with the adjacent properties and with the Future Land Use Map in the
Comprehensive Plan.
e. Addresses a demonstrated community need. In the northern part of Beaufort
County, the predominant tax base consists of rural residential areas. The
suggested rezoning aims to promote a range of entry level housing options. As
stated in the Comprehensive Plan, the most suitable option for the property is the
72
Item 11.
8
PTO, which aligns with the community’s immediate needs or long-term
development objectives.
f. Is required by changed conditions. The use of the property as a pine planation is
no longer considered its optimal use. The prospective owners aim to align the
property's zoning with the Future Land Use Map outlined in the Comprehensive
Plan. They envision transforming the land into entry-level housing to meet the
housing needs of the growing employment base in northern Beaufort County.
Given the county's remarkable rate of growth, which is expected to persist, there
is a pressing need to address the imbalance between high demand and limited
supply. Rezoning this property presents an opportunity to tackle this crucial issue
of accommodating the area's rapid growth.
g. Is compatible with existing and proposed uses surrounding the land subject to
the application, and is the appropriate zone and uses for the land. Owing to its
close proximity to neighboring parcels presently zoned as Neighborhood Mixed-
Use (C3NMU) and the Future Land Use Map designating adjacent parcels as
C3NMU and/or PTO, the proposed zoning aligns seamlessly with the
surrounding zoning and land uses. This parcel is poised to function as a natural
extension of the existing Neighborhood Mixed-Use (C3NMU) in this area. The
PTO designation, as determined by the Comprehensive Plan, is the most
appropriate zoning designation for the property.
h. Would not adversely impact nearby lands. The newly implemented stormwater
ordinance in the County will be applicable to all forthcoming property
developments. Furthermore, these future developments will incorporate open
space and natural resource protection to safeguard adjacent properties against
any visual impacts. The 12.91 Acres of Civic Space, and the 10% (T4HC) & 20%
(T3HN) Natural Resource Protection will go a long way towards proper
stewardship of the land.
i. Would result in a logical and orderly development pattern. The location is
conveniently reachable from both Jennings and Ramsey Roads, seamlessly
linking to the neighboring development layout and offering the potential for a
secure and pedestrian-friendly community experience.
j. Would not result in adverse impacts on the natural environment—including, but
not limited to, water, air, noise, storm water management, wildlife, vegetation,
wetlands, and the natural functioning of the environment. The property’s future
development would meet or exceed the County’s current development standards
for Civic Space, natural resource protection, and stormwater management.
k. Would result in development that is adequately served by public facilities (e.g.,
streets, potable water, sewerage, stormwater management, solid waste
collection and disposal, schools, parks, police, and fire and emergency medical
facilities). It is anticipated that the proposed rezoning and redevelopment will be
served by existing utilities and community facilities. There is adequate space to
address stormwater on site for any development. No additional roadways would
be required to serve this site.
73
Item 11.
9
III. CONCLUSION.
a. The Owner believes the foregoing narrative and analysis demonstrates that this
Application for Zoning Map Amendment is in conformance with the County’s
Comprehensive Plan and meets the criteria of the CDC Division 7.3.50.
Accordingly, the Owner respectfully requests that the Planning Commission and
County Council:
b. Review this Application and the supporting documentation.
c. Find the following:
i. That this Application is consistent with and furthers the goals and policies
of the Comprehensive Plan and the purposes of this Development Code.
ii. That this Application is not in conflict with any provision of this
Development Code, or the Code of Ordinances
iii. That this Application addresses a demonstrated community need.
iv. That this Application is required by changed conditions.
v. That this Application is compatible with existing and proposed uses
surrounding the land subject to the application and is the appropriate
zone and uses for the land.
vi. That this Application would not adversely impact nearby lands.
vii. That this Application would result in a logical and orderly development
pattern.
viii. That this Application would not result in adverse impacts on the natural
environment.
ix. That this Application would result in development that is adequately
served by public facilities.
d. Recommend approval of this Application and the rezoning of the Place Type
Overlay (Hamlet Place Type designation) with the uses and density set forth in
the Beaufort County Community Development Code, and in accordance with the
attached Transect Regulating Plan and PTO Regulating Plan.
Respectfully re-submitted on behalf of the Owner this 18th day of April
2025.
Regards,
Josh K. Tiller, PLA, ASLA
President, J.K. Tiller Associates, Inc.
74
Item 11.
75
Item 11.
76
Item 11.
77
Item 11.
78
Item 11.
79
Item 11.
March 2025
© Kimley-Horn and Associates, Inc.
Ramsey Farm Residential Development
Traffic Impact Analysis
Beaufort County, South Carolina
Prepared for
Beaufort County
Prepared by
Final Draft
80
Item 11.
March 2025
© Kimley-Horn and Associates, Inc.
1080 Morrison Drive, Suite 240
Charleston, South Carolina, 29403
Ramsey Farm Residential Development
Traffic Impact Analysis
Beaufort County, South Carolina
Prepared for
Beaufort County
Prepared by
Final Draft
81
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page i March 2025
Table of Contents
Executive Summary ................................ ................................ ................................ .................iii
1 Introduction ................................ ................................ ................................ ...........................1
1.1 Existing Conditions................................ ................................ ................................ ...................... 1
2 Project Traffic ................................ ................................ ................................ .......................5
2.1 Trip Generation ................................ ................................ ................................ ........................... 5
2.2 Trip Distribution & Assignment ................................ ................................ ................................ .... 5
3 Traffic Volume Development................................ ................................ ................................ 8
3.1 2024 Existing Traffic Development ................................ ................................ .............................. 8
3.2 2028 No-Build Traffic Development ................................ ................................ ............................. 8
3.3 2028 Build Traffic Development ................................ ................................ ................................ ... 8
4 Capacity Analysis ................................ ................................ ................................ ...............15
4.1 Broad River Boulevard at Jennings Road ................................ ................................ .................. 16
4.2 County Shed Road at Jennings Road ................................ ................................ ........................ 17
4.3 Jennings Road at Drafts Way/Site Access #1 ................................ ................................ ............ 18
4.4 Broad River Boulevard at Ramsey Road ................................ ................................ ................... 19
4.5 County Shed Road at Ramsey Road ................................ ................................ ......................... 20
4.6 Parris Island Gateway at County Shed Road ................................ ................................ ............. 21
4.7 Broad River Boulevard at WK Alston Drive ................................ ................................ ................ 23
4.8 Parris Island Gateway at Broad River Boulevard/Church Access ................................ ............... 24
4.9 Ramsey Road at Site Access #2 ................................ ................................ ............................... 25
5 Conclusion ................................ ................................ ................................ ..........................26
Final Draft
82
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page ii March 2025
List of Figures
Figure 1 – Project Location Map ................................ ................................ ................................ .3
Figure 2 – 2024 Existing Lane Geometry ................................ ................................ ....................4
Figure 3 – AM and PM Project Trip Distribution and Assignment ................................ ................6
Figure 4 – School Dismissal Project Trip Distribution and Assignment ................................ ........7
Figure 5 – 2024 Existing AM and PM Peak Hour Traffic Volumes ................................ ...............9
Figure 6 – 2024 Existing School Dismissal Peak Hour Traffic Volumes................................ .....10
Figure 7 – 2028 No-Build AM and PM Peak Hour Traffic Volumes ................................ ............11
Figure 8 – 2028 No-Build School Dismissal Peak Hour Traffic Volumes ................................ ...12
Figure 9 – 2028 Build AM and PM Peak Hour Traffic Volumes ................................ .................13
Figure 10 – 2028 Build School Dismissal Peak Hour Traffic Volumes ................................ .......14
List of Tables
Table 1 – Trip Generation Summary ................................ ................................ ...........................5
Table 2 – HCM Level of Service Criteria ................................ ................................ ...................15
Table 3 – Broad River Boulevard at Jennings Road Capacity Analysis Results ........................16
Table 4 – County Shed Road at Jennings Road Capacity Analysis Results .............................. 17
Table 5 – Jennings Road at Drafts Way/Site Access #1 Capacity Analysis Results ..................18
Table 6 – Broad River Boulevard at Ramsey Road Capacity Analysis Results..........................19
Table 7 – County Shed Road at Ramsey Road Capacity Analysis Results ............................... 20
Table 8 – Parris Island Gateway at County Shed Road Capacity Analysis Results ...................21
Table 9 – Broad River Boulevard at WK Alston Drive Capacity Analysis Results ......................23
Table 10 – Parris Island Gateway at Broad River Boulevard/Church Access Capacity Analysis
Results ................................ ................................ ................................ ................................ ......24
Table 11 – Ramsey Road at Site Access #2 Capacity Analysis Results ................................ ....25
List of Appendices
A – Conceptual Site Plan
B – Trip Generation Calculations
C – Traffic Volume Development Worksheets
D – Raw Turning Movement Counts
E – Historic Growth Rate Calculation
F – Approved Developments
G – Capacity Analysis Worksheets
H – Turn Lane Warrant Analysis
Final Draft
83
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page iii March 2025
Executive Summary
The proposed Ramsey Farm Residential Development is located on Assessor’s Parcel Number
R100 028 000 0264 0000 northeast of the Broad River Boulevard at Jennings Road intersection
in Beaufort County, South Carolina. The Ramsey Farm Residential Development is anticipated to
consist of 160 single family detached units and 84 townhome units. The anticipated project traffic
will access the roadway network via two proposed full-movement, stop-controlled intersections.
Site Access #1 will align with the existing Jennings Road at Drafts Way intersection. Site Access
#2 is located along Ramsey Road, approximately one third of a mile south of County Shed Road.
The project is proposed to be constructed and fully occupied by 2028. This study summarizes the
results of the traffic analyses during the AM, School Dismissal, and PM peak hours for 2024
Existing, 2028 No-Build, 2028 Build, and 2028 Build Improved conditions at the following study
intersections:
1.) Broad River Boulevard at Jennings Road
2.) County Shed Road at Jennings Road
3.) Jennings Road at Drafts Way/Site Access #1
4.) Broad River Boulevard at Ramsey Road
5.) County Shed Road at Ramsey Road
6.) Parris Island Gateway at County Shed Road/Ice House Road
7.) Broad River Boulevard at WK Alston Drive
8.) Parris Island Gateway at Broad River Boulevard/Church Access
9.) Ramsey Road at Site Access #2
Traffic operations were evaluated under 2024 Existing, 2028 No-Build, 2028 Build, and 2028 Build
Improved conditions during the AM, School Dismissal, and PM peak hours of travel. With the
addition of traffic associated with the proposed development, the following improvements are
recommended:
Broad River Boulevard at WK Alston Drive
· Construct an eastbound right-turn lane with 200 feet of full width storage and a 150-foot
taper.
o Please note, other nearby developments are contributing to the need for this
improvement in the no-build conditions
Jennings Road at Drafts Way/Site Access #1
· Please note, the capacity analysis contained within this TIA assumes Site Access #1 will
align with Drafts Way. The offset intersection shown in the site plan for Site Access #1,
will not be allowed by Beaufort County. The concept plan will need to be updated to show
Site Access #1 aligning with Drafts Way.
· Site Access #1 is recommended to operate as full-movement, under minor street stop-
control with a single ingress and a single egress lane.
Ramsey Road at Site Access #2
· Site Access #2 is recommended to operate as full-movement, under minor street stop-
control
· Site Access #2 is recommended to be constructed with a single ingress and a single
egress lane.
Final Draft
84
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 1 March 2025
1 Introduction
The proposed Ramsey Farm Residential Development is located on Assessor’s Parcel Number
R100 028 000 0264 0000 northeast of the Broad River Boulevard at Jennings Road intersection
in Beaufort County, South Carolina. The Ramsey Farm Residential Development is anticipated to
consist of 160 single family detached units and 84 townhome units. The anticipated project traffic
will access the roadway network via two proposed full -movement, stop-controlled intersections.
Site Access #1 will align with the existing Jennings Road at Drafts Way intersection. Site Access
#2 is located along Ramsey Road, approximately one third of a mile south of County Shed Road.
The location of the proposed development and existing lane geometry are illustrated in Figure 1
and Figure 2, respectively. A conceptual site plan is provided in Appendix A. Please note, the
capacity analysis contained within this TIA assumes Site Access #1 will align with Drafts Way.
The offset intersection, shown in the site plan for Site Access #1, will not be allowed by Beaufort
County. The concept plan will need to be updated to show Site Access #1 aligning with Drafts
Way.
This study summarizes the results of the traffic analyses during the AM, School Dismissal, and
PM peak hours for 2024 Existing, 2028 No-Build, 2028 Build, and 2028 Build Improved conditions
at the following study intersections:
1.) Broad River Boulevard at Jennings Road
2.) County Shed Road at Jennings Road
3.) Jennings Road at Drafts Way/Site Access #1
4.) Broad River Boulevard at Ramsey Road
5.) County Shed Road at Ramsey Road
6.) Parris Island Gateway at County Shed Road/Ice House Road
7.) Broad River Boulevard at WK Alston Drive
8.) Parris Island Gateway at Broad River Boulevard/Church Access
9.) Ramsey Road at Site Access #2
1.1 Existing Conditions
Parris Island Gateway is a four-lane urban principal arterial, divided by a two-way left turn lane
(TWLTL) and has posted speed limit of 35 miles per hour (MPH) in the vicinity of the study area.
According to SCDOT count station data, Parris Island Gateway carried an annual average daily
traffic (AADT) count of 18,400 vehicles per day in (VPD) 2023.
Broad River Boulevard is an undivided two-lane urban major collector with a posted speed limit
of 35 MPH east of Ramsey Road and 45 MPH to the west . According to SCDOT count station
data, County Shed Road carried an AADT of 7,000 VPD in 2023.
County Shed Road is an undivided two -lane urban local road with a posted speed limit of 45
MPH in the vicinity of the study area. According to SCDOT count station data, County Shed Road
carried an AADT of 2,700 VPD in 2023.
Final Draft
85
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 2 March 2025
Jennings Road is a two-lane urban local road with a posted speed limit of 45 MPH. SCDOT does
not provide AADT data along Jennings Road.
Ramsey Road is an undivided two -lane urban local road with no posted speed limit. Based on
SCDOT Road Information System (RIS ) classification, the assumed speed limit is 35 MPH.
SCDOT does not provide AADT data along Jennings Road.
Drafts Way is an undivided two -lane private road with no posted speed limit and serves as an
access to Battery Creek High School. SCDOT does not provide AADT data along Jennings Road.
WK Alston Drive is an undivided two-lane urban local road with a posted speed limit of 35 MPH.
SCDOT does not provide AADT data along Jennings Road.
Final Draft
86
Item 11.
Project
Site
Ramsey Farm Residential Development
Figure 1 - Project Location Map
Study Intersections
1.) Broad River Boulevard at Jennings Road
2.) County Shed Road at Jennings Road
3.) Jennings Road at Drafts Way/Site Access #1
4.) Broad River Boulevard at Ramsey Road
5.) County Shed Road at Ramsey Road
6.) Parris Island Gateway at County Shed Road/Ice House Road
7.) Broad River Road at WK Alston Drive
8.) Parris Island Gateway at Broad River Road/Church Access
9.) Ramsey Farm Road at Site Access #2
1
3
4
8
6
7
5
2
Ramsey Road
Jennings Road
WK Alston Drive
Church Access
9
Drafts Way
Final Draft
87
Item 11.
Ramsey Farm Residential Development
Figure 2 - 2024 Existing Lane Geometry
Legend
Existing Laneage
S = XX' Storage Length
Existing Signal
Existing Stop Control
Existing Channelization
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road
WK Alston
Drive
S = 175'
S = 200'S = 200'
S = 175'
S = 200'
S = 125'
S = 250'
S = 100'
S = 150'
S = 275'
Ice House Road
S = 150'
S = 150'
S = 125'
Drafts Way
S = 200'
Church
Access
Final Draft
88
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 5 March 2025
2 Project Traffic
2.1 Trip Generation
The trip generation rates, equations, and time of day distribution tables published in the Institute
of Transportation Engineers’ (ITE) Trip Generation Manual; 11th Edition were used to estimate
the trip generation potential for the development. The analysis was performed using the
information for the land use code (LUC) 210 - Single-Family Detached Housing and LUC 215 -
Single-Family Attached Housing. The published time of day distributions from ITE were used to
develop the School Dismissal peak hour volumes.
As shown in Table 1, the development is anticipated to generate 152 (42 In/110 Out) AM peak
hour trips, 155 (92 In/63 Out) School Dismissal peak hour trips, and 201 (124 In/77 Out) PM peak
hour trips. The estimated trip generation is summarized in Table 1 , and the t rip generation
calculations can be found in Appendix B.
Table 1 – Trip Generation Summary
Land Use Intensity Units Daily
AM Peak Hour School Dismissal
Peak Hour PM Peak Hour
Total In Out Total In Out Total In Out
210 - Single-Family
Detached Housing 160 DU 1,555 114 30 84 117 68 49 155 98 57
215 - Single-Family
Attached Housing 84 DU 590 38 12 26 38 24 14 46 26 20
Total Net New External Trips 2,145 152 42 110 155 92 63 201 124 77
2.2 Trip Distribution & Assignment
New external trips generated by the proposed development were distributed and assigned to the
surrounding roadway network based on existing travel patterns, surrounding land uses, and the
proposed site layout. The trip distribution percentages used in this analysis are as follows.
• 25% to/from the west via Broad River Boulevard
• 15% to/from the south via WK Alston Drive
• 35% to/from the south via Parris Island Gateway
• 10% to/from the west via County Shed Road
• 15% to/from the north via Parris Island Gateway
The project trip distributions and assignments are illustrated in Figure 3 and Figure 4.
Final Draft
89
Item 11.
2 'Int 2'! 5 'Int 5'! 6 'Int 6'!
10 'Int 10'!
3 'Int 3'!
1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'!
39 (26)15
(30)
(12)
(12)
(7)
11
411
4
2 (8) 11(12) 4 (7)
(19) 7 (20) 15 (19) 6 (4) 6
11 (8) 6 (4) 4 (12)
8 (24) 15 (20) 9 (24)
17
21
11
17
22
(12)
(15)
(8)
(11)
(15)
15
(43)
(43)
(27) 38
6
(12) 16
17 (12)
(19)
(19)6
(8) 11
(4)
(8)
(4)
(8)
(12)
(4)
5
11
4
6(7) 2
6
11 (6) 2
(6) 2 (8) 11
5 (4) 4 (12)
4
2
(8) 11
4 (12) 4 (13)
(13)
(6)
(6)2
(19) 26
Ramsey Farm Residential Development
Figure 3 - AM and PM Project Trip Distribution and Assignment
Project
Site
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road10%
15%
25%
35%15% WK Alston
Drive
Drafts Way
Ice House Road
Site Access #1
Site Access #2
Legend
xx AM Peak Hour Project Trips
(xx) PM Peak Hour Project Trips
Entering/Exiting Trip DistributionXX%
Church
Access
Final Draft
90
Item 11.
2 'Int 2'! 5 'Int 5'! 6 'Int 6'!
10 'Int 10'!
3 'Int 3'!
1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'!
14 16 14 3
8
5 79
17
23
96
6 4 10
5
618 16 18
9
13
10
13
32
22
23
32
14
9
9 14
6
3
6
9
35
3
6 5
5 6
3 9
9
5
6
9 9
Ramsey Farm Residential Development
Figure 4 - School Dismissal Project Trip Distribution and Assignment
Project
Site
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road10%
15%
25%
35%15% WK Alston
Drive
Drafts Way
Ice House Road
Site Access #1
Site Access #2
Legend
xx School Dismissal Peak Hour
Project Trips
Entering/Exiting Trip DistributionXX%
Church
Access
Final Draft
91
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 8 March 2025
3 Traffic Volume Development
The 2024 Existing traffic volumes were utilized in the analysis to develop future-year traffic
volumes for the projected 2028 conditions. The future -year volumes consisted of the existing
traffic volumes adjusted by an annual growth rate and the anticipated traffic volumes of the
proposed development. Worksheets documenting the traffic volume development are provided in
Appendix C.
3.1 2024 Existing Traffic Development
Peak hour intersection turning movement counts were conducted in the AM peak period (6:00 AM
to 9:00 AM), School Dismissal peak period (2:00 PM to 4:00 PM), and PM peak period (4:00 PM
to 6:00 PM) on Thursday, November 21st, 2024, at the study area intersections.
Figure 5 illustrates the 2024 Existing AM and PM Peak Hour Traffic Volumes and Figure 6 shows
the 2024 Existing School Dismissal Peak Hour Traffic Volumes. The raw turning movement count
data is included in Appendix D.
3.2 2028 No-Build Traffic Development
The development is anticipated to be built and operational by 2028. The future -year traffic
volumes consist of the 2024 Existing traffic volumes, grown by a rate of 3% per year and incudes
two approved developments to develop the 2028 No-Build traffic volumes.
To determine the historical growth rate in the area, traffic count data was obtained from three
SCDOT count stations within the study area network. The short-term and long-term growth rates
were calculated to be 1.0% and 4.3%, respectively. As such, a 3% annual growth rate was utilized
as part of this analysis. The 3% growth rate was approved by Beaufort County during the scoping
process. Historic growth rate calculations are provided in Appendix E.
Burtonwood Apartments and The Grove at Broad River are two approved residential
developments identified within the vicinity of the study area network. The location of the
developments and the associated project trip assignments are provided in Appendix F.
Figure 7 illustrates the 2028 No-Build AM and PM Peak Hour Traffic Volumes and Figure 8
shows the 2028 No-Build School Dismissal Peak Hour Traffic Volumes.
3.3 2028 Build Traffic Development
The anticipated Ramsey Farm Residential Development project traffic volumes were added to the
2028 No-Build traffic volumes to develop 2028 Build traffic volumes. Figure 9 illustrates the 2028
Build AM and PM Peak Hour Traffic Volumes and Figure 10 illustrates the 2028 Build School
Dismissal Peak Hour Traffic Volumes.
Final Draft
92
Item 11.
2 'Int 2'! 5 'Int 5'! 6 'Int 6'!
3 'Int 3'!
1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'!
(64)
(868)
(2) 0
(249)
(83)
(0) 0
34
707224
146
68 (245) 269(283) 302 (169)
0 (0)
(96) 77 (186) 225 (24) 24 (180) 254
142 (391) 65 (29) 149 (246)
(1)
102 (90) 98 (232) 10 (20) 0 (0)
14
16
654
0
0
125
88
147
(15)
(13)
(994)
(0)
(16)
(126)
(89)
(72)
(202)
(21) 41
(28) 66
53
72
(22)
(111)
70
118
7
(94) 69
(117)
(30)
(10)
(10)
(103)
(786)
(11)
13
5 (14) 30
41
748(104) 132
89
24 (10) 10
(104) 128 (124) 142
1 (6)
7
17 (32)
72 (156) 115 (175) 2 (3)
74
700
(26) 48
56 (29) 2 (1)
(70)
(1,028)
(4)
(78) 31
Ramsey Farm Residential Development
Figure 5 - 2024 Existing AM and PM Peak Hour Traffic Volumes
Legend
xx AM Peak Hour Traffic Volumes
(xx) PM Peak Hour Traffic Volumes
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road
WK Alston
Drive
Drafts Way
Ice House Road
Church
Access
Final Draft
93
Item 11.
2 'Int 2'! 5 'Int 5'! 6 'Int 6'!
3 'Int 3'!
1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'!
26
31 2 8
16
21
112 129 7
84
854
96
105
22 16
95 101
38
90
10
106
14
6 19
100
776
35
52
42
92
0
64 181
86
91 122 171 18 0
17
17
851
0
0
168
158
261 48 202
40
80 142 25
00
52
860181
212232
Ramsey Farm Residential Development
Figure 6 - 2024 Existing School Dismissal Peak Hour Traffic Volumes
Legend
xx School Dismissal Peak Hour Traffic Volumes
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road
WK Alston
Drive
Drafts Way
Ice House Road
Church
Access
Final Draft
94
Item 11.
2 'Int 2'! 5 'Int 5'! 6 'Int 6'!
3 'Int 3'!
1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'!
(23)
(11)
(11)
(36)
2 (3)
1 (7)8(12)
46
921
(116)
(100)
(81)
99
165 115 (101)
174 (448)
(108) 87
(332) 345
119 (266)
77 (35)
(218) 255
(194) 255
169
78
(283)
(97)
(27) 27
(307) 325
(1,174)
(0)
755
0
0 (1)
0 (0)
0 (0)
(212) 313
(0) 0
38
848
0
(72)
(1,009)
(2)
11
(25)
(125)
79
133
(24) 46
(32) 74
60
81
(18)
(142)
(132)
(34)
81 (176)
63 (33)
(117) 149
(117) 144
100
27
(140) 160
(11) 11
(926)
(5)8
19
(16) 34
(106) 78 (79)
(1,239)
83
813
(29) 54(254)147
(95) 35
129 (197)15
6
184 (302)
(17)
(15)
16
18
2 (1)
Ramsey Farm Residential Development
Figure 7 - 2028 No-Build AM and PM Peak Hour Traffic Volumes
Legend
xx AM Peak Hour Traffic Volumes
(xx) PM Peak Hour Traffic Volumes
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road
WK Alston
Drive
Ice House Road
Drafts Way
Church
Access
Final Draft
95
Item 11.
2 'Int 2'! 5 'Int 5'! 6 'Int 6'!
3 'Int 3'!
1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'!
29
35 2 9
18
24
126 145 8
95
1,004
108
118
25 18
107 114
43
101
11
119
16
7 21
113
921
39
59
47
104
97
102 137 198 20 0
19
19
988
0
0
202
0
90 164 28 192
303 56 243
207
242
74 225268
48
00
59
1,002
Ramsey Farm Residential Development
Figure 8 - 2028 No-Build School Dismissal Peak Hour Traffic Volumes
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road
WK Alston
Drive
Drafts Way
Ice House Road
Legend
xx School Dismissal Peak Hour Traffic Volumes
Church
Access
Final Draft
96
Item 11.
2 'Int 2'! 5 'Int 5'! 6 'Int 6'!
10 'Int 10'!
3 'Int 3'!
1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'!
(102)
(1,021)
(2) 0
(295)
(104)
(0) 0
49
852266
173
80 (315) 336(344) 349 (201)
0 (0)
(127) 94 (238) 270 (46) 33 (216) 319
185 (456) 83 (39) 188 (314)
(1)
123 (125) 134 (286) 20 (47) 0 (0)
33
39
766
0
0
(1,182)
(0)
(111)
(96)
(18)
(142)
(43)
116
187
(29)
(260)149
20
(43)
(23)
(27) 38
15
(30)
(19)
(12)
6
14
(12) 16
8
(114) 89
(136)
(42)
(15)
(19)
(128)
(930)
(12)
20
17 (16) 34
50
927(124) 151
106
38 (17) 13
(123) 146 (148) 171 (37) 65
67 (45) 6 (14) 1 (7)
8
19 (36)
86 (180) 133 (209) 2 (3)
87
815
(92)
(1,245)
(5)
(25)
(125)
(19)
79
133
6
17 (12)
0 (0)
(114) 61
39 (26)
(24) 46
(0) 0
60
81
15
(32) 74
Ramsey Farm Residential Development
Figure 9 - 2028 Build AM and PM Peak Hour Traffic Volumes
Legend
xx AM Peak Hour Traffic Volumes
(xx) PM Peak Hour Traffic Volumes
Project
Site
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road
WK Alston
Drive
Drafts Way
Ice House Road
Site Access #1
Site Access #2
Church
Access
Final Draft
97
Item 11.
2 'Int 2'! 5 'Int 5'! 6 'Int 6'!
10 'Int 10'!
3 'Int 3'!
1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'!
112 120
44 11
129 15419
13113
121
31 23
43
101
14
9
155 214 38 0
29
32
994
0
0
104 180 42 195
309 60 253
0
82
1,011213277
65
232
250
79
23
32
23
0
47
104
32
59
0
22
0
106
115
207
39
35
0
9 14
20
21
122
924
11
125
24
8
9
104
1,009
18
Ramsey Farm Residential Development
Figure 10 - 2028 Build School Dismissal Peak Hour Traffic Volumes
Project
Site
Parris Island Gateway
Jennings Road
Ramsey Road
Broad River
Boulevard
County Shed Road
WK Alston
Drive
Drafts Way
Ice House Road
Site Access #1
Site Access #2
Legend
xx School Dismissal Peak Hour Traffic Volumes
Church
Access
Final Draft
98
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 15 March 2025
4 Capacity Analysis
Capacity analyses were conducted using the Highway Capacity Manual (HCM) , 6th Edition,
methodologies of the Synchro, Version 1 2, traffic analysis software. Capacity analyses were
conducted for the AM, School Dismissal, and PM peak hours for the 2024 Existing, 2028 No-Build
conditions, 2028 Build, and 2028 Build Improved conditions analysis scenarios.
Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related
to the level of control delay at the intersection and characterize the operational conditions of the
intersection traffic flow. LOS A operations typically repr esent ideal, free -flow conditions where
vehicles experience little to no delays, and LOS F operations typically represent poor, gridlocked
conditions with high vehicular delays, and are generally considered undesirable. Table 2 lists the
LOS control delay thresholds published in the HCM for signalized and unsignalized intersections.
Table 2 – HCM Level of Service Criteria
LOS
Control Delay per Vehicle (sec/veh)
Signalized Intersections Unsignalized Intersections
A ≤ 10 ≤ 10
B > 10 – 20 > 10 – 15
C > 20 – 35 > 15 – 25
D > 35 – 55 > 25 – 35
E > 55 – 80 > 35 – 50
F > 80 > 50
As part of the capacity analysis, SCDOT’s default Synchro parameters were utilized. Existing
peak hour factors (PHF) were utilized for the existing and future -year scenarios for the existing
intersections part of this study. Proposed intersections were assumed to have a PHF of 0.9 .
Existing heavy vehicle percentages were utilized for all scenarios, with a minimum of 2%
considered.
Unsignalized intersections operating at LOS A-LOS C are considered to operate with short delays,
unsignalized intersections operating at LOS D -LOS E are considered to operate with moderate
delays, and intersections operating at LOS F are considered to operate with long delays.
Please note, this TIA assumes a passenger car length is 25 feet.
In the following subsections in the capacity analysis, the queues at unsignalized intersections may
be longer on the side streets versus signalized intersections due to limited available gaps for
these movements. A traffic signal can allow for shorter queue s on the side streets because the
signal forces the mainline to stop, whereas at unsignalized intersections the mainline is not forced
to stop to provide gaps to the side streets.
The following sections outline the results of the capacity analysis for each of the study
intersections. The capacity analysis worksheets are included in Appendix G.
Final Draft
99
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 16 March 2025
4.1 Broad River Boulevard at Jennings Road
The capacity analysis results for the Broad River Boulevard at Jennings Road intersection are
summarized in Table 3.
Table 3 – Broad River Boulevard at Jennings Road Capacity Analysis Results
Condition Measure Broad River Boulevard Broad River Boulevard Jennings Road
EBL EBT WBT WBR SBL SBR
AM Peak Hour
2024 Existing LOS (Delay) A (7.7)* A (0.0) C (17.4)
Synchro 95th Q 5' 0' 0' 0' 55' 10’
2028 No-Build LOS (Delay) A (7.8)* A (0.0) C (23.1)
Synchro 95th Q 5' 0' 0' 0' 88' 13’
2028 Build LOS (Delay) A (7.9)* A (0.0) D (29.0)
Synchro 95th Q 8' 0' 0' 0' 125' 15’
School Dismissal Peak Hour
2024 Existing LOS (Delay) A (8.2)* A (0.0) C (16.1)
Synchro 95th Q 8' 0' 0' 0' 35' 13’
2028 No-Build LOS (Delay) A (8.4)* A (0.0) C (19.8)
Synchro 95th Q 8' 0' 0' 0' 53' 15’
2028 Build LOS (Delay) A (8.4)* A (0.0) C (23.6)
Synchro 95th Q 10' 0' 0' 0' 75' 18’
PM Peak Hour
2024 Existing LOS (Delay) A (8.4)* A (0.0) C (16.6)
Synchro 95th Q 8' 0' 0' 0' 28' 13’
2028 No-Build LOS (Delay) A (8.7)* A (0.0) C (20.4)
Synchro 95th Q 8' 0' 0' 0' 43' 15’
2028 Build LOS (Delay) A (8.8)* A (0.0) C (24.9)
Synchro 95th Q 10' 0' 0' 0' 63' 18’
Notes:
* - Left turn delay for major street is reported
Based on the results presented in Table 3, the analyzed intersection approaches are anticipated
to experience short delays in the 2024 Existing and the 2028 No-Build scenarios. With the addition
of the development traffic, the intersection approaches are anticipated to continue to operate with
short delays during the School Dismissal and PM peak hours but experience moderate delays on
the southbound approach in the AM peak hour. During the AM peak hour, the development traffic
is anticipated to increase the southbound Synchro 95th percentile queue length by less than two
passenger car lengths, when compared to the 2028 No-Build condition. Unsignalized, side street
movements operating over capacity are typical during peak hour conditions.
No capacity improvements are recommended at this intersection.
Final Draft
100
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 17 March 2025
4.2 County Shed Road at Jennings Road
The capacity analysis results for the County Shed Road at Jennings Road intersection are
summarized in Table 4.
Table 4 – County Shed Road at Jennings Road Capacity Analysis Results
Condition Measure County Shed Road County Shed Road Jennings Road
EBT EBR WBL WBT NBL NBR
AM Peak Hour
2024 Existing LOS (Delay) A (0.0) A (8.1)* B (11.6)
Synchro 95th Q 0' 0' 5' 0' 15' 3'
2028 No-Build LOS (Delay) A (0.0) A (8.2)* B (12.3)
Synchro 95th Q 0' 0' 5' 0' 20' 3'
2028 Build LOS (Delay) A (0.0) A (8.2)* B (12.5)
Synchro 95th Q 0' 0' 5' 0' 23' 5'
School Dismissal Peak Hour
2024 Existing LOS (Delay) A (0.0) A (7.9)* B (11.9)
Synchro 95th Q 0' 0' 3' 0' 23' 3'
2028 No-Build LOS (Delay) A (0.0) A (8.0)* B (12.8)
Synchro 95th Q 0' 0' 3' 0' 28' 3'
2028 Build LOS (Delay) A (0.0) A (8.1)* B (13.4)
Synchro 95th Q 0' 0' 3' 0' 30' 3'
PM Peak Hour
2024 Existing LOS (Delay) A (0.0) A (7.8)* B (11.5)
Synchro 95th Q 0' 0' 3' 0' 20' 3'
2028 No-Build LOS (Delay) A (0.0) A (7.8)* B (12.2)
Synchro 95th Q 0' 0' 3' 0' 25' 3'
2028 Build LOS (Delay) A (0.0) A (7.9)* B (12.7)
Synchro 95th Q 0' 0' 3' 0' 28' 5'
Notes:
* - Left turn delay for major street is reported
Based on the results presented in Table 4, the intersection is anticipated to operate with short
delays during the analyzed scenarios. No capacity improvements are recommended at this
intersection.
Final Draft
101
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 18 March 2025
4.3 Jennings Road at Drafts Way /Site Access #1
The capacity analysis results for the Jennings Road at Drafts Way /Site Access #1 intersection
are summarized in Table 5. The site access is analyzed with a single ingress and egress lane
and operates as a full-movement stop-controlled approach.
Table 5 – Jennings Road at Drafts Way/Site Access #1 Capacity Analysis Results
Condition Measure Drafts Way Site Access #1 Jennings Road Jennings Road
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
AM Peak Hour
2024 Existing LOS (Delay) B (12.8) - A (8.1)* A (0.0)
Synchro 95th Q 25' 5' 0'
2028 No-Build LOS (Delay) B (13.9) - A (8.3)* A (0.0)
Synchro 95th Q 33' 8' 0'
2028 Build LOS (Delay) C (15.4) C (17.6) A (8.3)* A (7.5)*
Synchro 95th Q 40' 23' 8' 0'
School Dismissal Peak Hour
2024 Existing LOS (Delay) B (12.1) - A (8.0)* A (0.0)
Synchro 95th Q 23' 5' 0'
2028 No-Build LOS (Delay) B (13.0) - A (8.1)* A (0.0)
Synchro 95th Q 28' 5' 0'
2028 Build LOS (Delay) B (14.8) C (16.3) A (8.1)* A (7.7)*
Synchro 95th Q 33' 13' 5' 3'
PM Peak Hour
2024 Existing LOS (Delay) B (10.2) - A (7.6)* A (0.0)
Synchro 95th Q 8' 0' 0'
2028 No-Build LOS (Delay) B (10.5) - A (7.6)* A (0.0)
Synchro 95th Q 8' 0' 0'
2028 Build LOS (Delay) B (11.3) B (12.5) A (7.6)* A (7.7)*
Synchro 95th Q 10' 8' 0' 3'
Notes:
* - Left turn delay for major street is reported
Based on the results presented in Table 5, the intersection approaches currently and are
anticipated to continue to operate with short delays during the analyzed scenarios . With the
construction of Site Access #1 as the westbound approach , the intersection approaches are
anticipated to continue to operate with short delays.
An auxiliary turn lane warrant analysis was conducted at Site Access #1 for the entering
northbound right-turn lane and southbound left-turn lane. SCDOT auxiliary turn lane warrants are
not met; therefore, turn lanes into Site Access #1 are not recommended . The turn lane warrant
analysis is provided in Appendix H.
No capacity improvements are recommended at this intersection. Please note, the capacity
analysis contained within this TIA assumes Site Access #1 will align with Drafts Way. The offset
intersection will not be allowed by Beaufort County. The concept plan will need to be updated to
show Site Access #1 aligning with Drafts Way. Site Access #1 is recommended to operate as full-
movement, under minor street stop -control. Site Access #1 is recommended to be constructed
with a single ingress and a single egress lane.
Final Draft
102
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 19 March 2025
4.4 Broad River Boulevard at Ramsey Road
The capacity analysis results for the Broad River Boulevard at Ramsey Road intersection are
summarized in Table 6.
Table 6 – Broad River Boulevard at Ramsey Road Capacity Analysis Results
Condition Measure Broad River Boulevard Broad River Boulevard Ramsey Road
EBL EBT WBT WBR SBL SBR
AM Peak Hour
2024 Existing LOS (Delay) A (7.6)* A (0.0) B (10.9)
Synchro 95th Q 3' 0' 0' 0' 5'
2028 No-Build LOS (Delay) A (7.7)* A (0.0) B (11.6)
Synchro 95th Q 3' 0' 0' 0' 5'
2028 Build LOS (Delay) A (7.7)* A (0.0) B (12.6)
Synchro 95th Q 3' 0' 0' 0' 13'
School Dismissal Peak Hour
2024 Existing LOS (Delay) A (7.8)* A (0.0) B (11.0)
Synchro 95th Q 3' 0' 0' 0' 5'
2028 No-Build LOS (Delay) A (7.9)* A (0.0) B (11.8)
Synchro 95th Q 3' 0' 0' 0' 5'
2028 Build LOS (Delay) A (8.0)* A (0.0) B (12.9)
Synchro 95th Q 3' 0' 0' 0' 10'
PM Peak Hour
2024 Existing LOS (Delay) A (8.0)* A (0.0) B (12.3)
Synchro 95th Q 3' 0' 0' 0' 5'
2028 No-Build LOS (Delay) A (8.2)* A (0.0) B (13.8)
Synchro 95th Q 3' 0' 0' 0' 8'
2028 Build LOS (Delay) A (8.4)* A (0.0) C (16.4)
Synchro 95th Q 5' 0' 0' 0' 18'
Notes:
* - Left turn delay for major street is reported
Based on the results presented in Table 6, the intersection is anticipated to operate with short
delays during the analyzed scenarios. No capacity improvements are recommended at this
intersection.
There is a potential cut through route for site traffic from Ramsey Road to Broad River Boulevard
via Glaze Drive. However, Glaze Drive is a skewed intersection with Broad River Boulevard and
is unsignalized, therefore, it is unlikely site traffic will utilize Glaze Drive as a cut through.
After the site is constructed and if cut through traffic is observed along Glaze Drive, the Ramsey
Farm Development would be responsible for implementing traffic calming measures per SCDOT
and/or Beaufort County guidelines.
Final Draft
103
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 20 March 2025
4.5 County Shed Road at Ramsey Road
The capacity analysis results for the County Shed Road at Ramsey Road intersection are
summarized in Table 7.
Table 7 – County Shed Road at Ramsey Road Capacity Analysis Results
Condition Measure County Shed Road County Shed Road Ramsey Road
EBT EBR WBL WBT NBL NBR
AM Peak Hour
2024 Existing LOS (Delay) A (0.0) A (7.6)* B (10.0)
Synchro 95th Q 0' 0' 3'
2028 No-Build LOS (Delay) A (0.0) A (7.6)* B (10.3)
Synchro 95th Q 0' 0' 3'
2028 Build LOS (Delay) A (0.0) A (7.6)* B (10.3)
Synchro 95th Q 0' 0' 5'
School Dismissal Peak Hour
2024 Existing LOS (Delay) A (0.0) A (7.6)* B (10.3)
Synchro 95th Q 0' 0' 3'
2028 No-Build LOS (Delay) A (0.0) A (7.6)* B (10.6)
Synchro 95th Q 0' 0' 5'
2028 Build LOS (Delay) A (0.0) A (7.7)* B (10.8)
Synchro 95th Q 0' 0' 5'
PM Peak Hour
2024 Existing LOS (Delay) A (0.0) A (7.5)* B (10.0)
Synchro 95th Q 0' 0' 3'
2028 No-Build LOS (Delay) A (0.0) A (7.6)* B (10.1)
Synchro 95th Q 0' 0' 3'
2028 Build LOS (Delay) A (0.0) A (7.6)* B (10.6)
Synchro 95th Q 0' 0' 5'
Notes:
* - Left turn delay for major street is reported
Based on the results presented in Table 7, the intersection is anticipated to operate with short
delays during the analyzed scenarios. No capacity improvements are recommended at this
intersection.
Final Draft
104
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 21 March 2025
4.6 Parris Island Gateway at County Shed Road
The capacity analysis results for the Parris Island Gateway at County Shed Road intersection are
summarized in Table 8.
Table 8 – Parris Island Gateway at County Shed Road Capacity Analysis Results
Condition Measure County Shed Road Ice House Road Parris Island Gateway Parris Island Gateway
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
AM Peak Hour
2024 Existing LOS (Delay) E (44.8) C (18.7) A (9.8)* A (9.5)*
Synchro 95th Q 53' 60' 0' 5’ 5' 0' 0' 0' 0'
2028 No-
Build
LOS (Delay) F (111.0) D (26.0) B (10.5)* B (10.3)*
Synchro 95th Q 98' 130' 3' 8’ 5' 0' 0' 0' 0'
2028 Build LOS (Delay) F (135.4) D (27.0) B (10.6)* B (10.3)*
Synchro 95th Q 130' 143' 3' 8’ 5' 0' 0' 0' 0'
School Dismissal Peak Hour
2024 Existing LOS (Delay) F (50.8) F (52.4) B (10.9)* A (9.5)*
Synchro 95th Q 43' 78' 18' 18’ 13' 0' 3' 0' 0'
2028 No-
Build
LOS (Delay) F (154.5) F (150.8) B (12.3)* B (10.2)*
Synchro 95th Q 83' 170' 40' 33’ 18' 0' 3' 0' 0'
2028 Build LOS (Delay) F (200.7) F (196.5) B (12.5)* B (10.2)*
Synchro 95th Q 105' 188' 45' 38’ 20' 0' 3' 0' 0'
PM Peak Hour
2024 Existing LOS (Delay) F (68.2) E (36.5) B (12.2)* A (9.5)*
Synchro 95th Q 58' 75' 13' 13’ 15' 0' 0' 0' 0'
2028 No-
Build
LOS (Delay) F (247.9) F (141.2) B (14.6)* B (10.2)*
Synchro 95th Q 98' 185' 40' 23’ 23' 0' 0' 0' 0'
2028 Build LOS (Delay) F ($) F (217.0) C (15.2)* B (10.2)*
Synchro 95th Q 128' 210' 43' 25’ 28' 0' 0' 0' 0'
Notes:
* - Left turn delay for major street is reported
$ - Delays exceeds 300 seconds
Based on the results presented in Table 8 , the eastbound minor street approach currently
operates with moderate delays during the AM peak hour and long delays during the School
Dismissal and PM peak hours. Please note, the existing capacity analysis results may have longer
delays and queues, as the spillback from the US 21/Boundary Street signal is not calculated in
this analysis.
In the 2028 No-Build conditions, the minor street approach is anticipated to operate with long
delays in the analyzed peak hours. The minor street delay is anticipated to increase from 2028
No-Build to 2028 Build conditions, however, the 95th percentile queue is anticipated to increase
by less than two passenger car lengths. Unsignalized, side street movements operating over
capacity are typical during peak hour conditions.
Please note, this intersection is under study by Beaufort County as part of an overall analysis of
the US 21 corridor. The intersection is proposed to operate as a right in/right out along with the
realignment of County Shed Road to intersect with US 21. The county does not currently have
funding for this project and therefore, the analysis reflects the traffic operations using the existing
intersection geometry. The side-street delays and queues are anticipated to decrease once this
Final Draft
105
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 22 March 2025
intersection is converted to a right-in/right-out by Beaufort County.
Based on the capacity analysis results presented in Table 8, the 2028 No-Build and 2028 Build
conditions are anticipated to operate similarly; therefore, no capacity improvements are
recommended at this intersection.
Final Draft
106
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 23 March 2025
4.7 Broad River Boulevard at WK Alston Drive
The capacity analysis results for the Broad River Boulevard at WK Alston Drive intersection are
summarized in Table 9.
Table 9 – Broad River Boulevard at WK Alston Drive Capacity Analysis Results
Condition Measure Broad River Boulevard Broad River Boulevard WK Alston
EBT EBR WBL WBT NBL NBR
AM Peak Hour
2024 Existing LOS (Delay) A (0.0) A (8.7)* C (18.0)
Synchro 95th Q 0' 5' 53' 10'
2028 No-Build LOS (Delay) A (0.0) A (9.1)* C (24.7)
Synchro 95th Q 0' 8' 90' 13'
2028 Build LOS (Delay) A (0.0) A (9.2)* D (29.5)
Synchro 95th Q 0' 8' 110' 15'
2028 Build Improved LOS (Delay) A (0.0) A (9.2)* C (20.7)
Synchro 95th Q 0' 0’ 8' 78' 10'
School Dismissal Peak Hour
2024 Existing LOS (Delay) A (0.0) A (8.3)* C (21.9)
Synchro 95th Q 0' 5' 98' 10'
2028 No-Build LOS (Delay) A (0.0) A (8.5)* E (35.6)
Synchro 95th Q 0' 5' 170' 10'
2028 Build LOS (Delay) A (0.0) A (8.6)* E (48.2)
Synchro 95th Q 0' 5’ 215' 13'
2028 Build Improved LOS (Delay) A (0.0) A (8.6)* D (29.6)
Synchro 95th Q 0' 0’ 5' 150' 10'
PM Peak Hour
p2024 Existing LOS (Delay) A (0.0) A (8.3)* C (23.4)
Synchro 95th Q 0' 3' 113' 10'
2028 No-Build LOS (Delay) A (0.0) A (8.5)* E (41.0)
Synchro 95th Q 0' 3' 203' 15'
2028 Build LOS (Delay) A (0.0) A (8.6)* F (60.3)
Synchro 95th Q 0' 3' 265' 15'
2028 Build Improved LOS (Delay) A (0.0) A (8.6)* E (36.5)
Synchro 95th Q 0' 0’ 3' 193' 13'
Notes:
* - Left turn delay for major street is reported
Based on the results presented in Table 9 , the northbound minor street approach currently
operates with short delays in the 2024 Existing scenario. During the 2028 No-Build conditions,
the minor street approach is anticipated to continue to operate with short-to-moderate delays.
With the addition of project traffic, the minor street approach is anticipated to operate with long
delays during the PM peak hour.
A turn lane warrant analysis was conducted at WK Alston Drive for the 2028 No-Build and 2028
Build traffic conditions. SCDOT auxiliary right-turn lane warrants are met in both the 2028 No-
Build and 2028 Build conditions; therefore, an eastbound right turn lane is recommended.
Based on the capacity analysis results presented in Tab le 9, improvements are needed as a
result of the added project trips during the no-build and build conditions. The 2028 Build Improved
Final Draft
107
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 24 March 2025
scenario includes an eastbound right-turn lane. With the eastbound right-turn lane in place, the
northbound approach of the intersection is anticipated to operate with short-to-moderate delays
during the analyzed peak periods. Please note, with the eastbound right-turn lane in place, the
2028 Build Improved delays are anticipated to be less than the 2028 No-Build delays for the
analyzed peak hours.
Based on the turn lane warrant analysis and the capacity analysis results, an eastbound right-
turn lane with 200 feet of full width storage and a 150-foot taper is recommended.
4.8 Parris Island Gateway at Broad River Boulevard/Church Access
The capacity analysis results for the Parris Island Gateway at Broad River Boulevard/Church
Access intersection are summarized in Table 10.
Table 10 – Parris Island Gateway at Broad River Boulevard/Church Access Capacity Analysis Results
Condition Measure
Broad River
Boulevard Church Access Parris Island
Gateway
Parris Island
Gateway Intersection
EBL EBR WBL WBT WBR NBL NBT SBT SBR
AM Peak Hour
2024
Existing
LOS (Delay) B (10.4) A (0.0) A (6.2) A (6.5) A (7.0)
Synchro 95th Q 118' 13' 0’ 22' 124' 132' 0'
2028 No-
Build
LOS (Delay) B (12.0) A (0.0) A (7.7) A (8.0) A (8.5)
Synchro 95th Q 158' 14' 0’ 27' 167' 173' 0'
2028 Build LOS (Delay) B (12.4) A (0.0) A (7.9) A (8.2) A (8.8)
Synchro 95th Q 161' 18' 0’ 35' 168' 176' 0'
School Dismissal Peak Hour
2024
Existing
LOS (Delay) B (12.9) A (0.0) A (4.6) A (5.1) A (5.6)
Synchro 95th Q 94' 18' 0’ 28' 128' 155' 0'
2028 No-
Build
LOS (Delay) B (15.5) A (0.0) A (5.5) A (6.0) A (6.7)
Synchro 95th Q 115' 20' 0’ 41' 163' 202' 0'
2028 Build LOS (Delay) B (19.8) A (0.0) A (5.7) A (6.0) A (7.3)
Synchro 95th Q 184' 31' 0’ 81' 236' 300' 0'
PM Peak Hour
2024
Existing
LOS (Delay) B (15.1) B (12.9) A (5.4) A (6.2) A (6.8)
Synchro 95th Q 110' 26' 0’ 48' 138' 211' 0'
2028 No-
Build
LOS (Delay) B (19.2) B (15.9) A (6.4) A (8.7) A (9.0)
Synchro 95th Q 129' 44' 0’ #83’ 168' 289' 0'
2028 Build LOS (Delay) C (29.9) C (24.5) A (6.8) A (7.4) A (9.7)
Synchro 95th Q #246' 58' 0’ #151’ 162' 273' 0'
Notes:
* - Left turn delay for major street is reported
# - 95th percentile volume exceeds capacity; queue may be longer
Based on the results presented in Table 10, the intersection is anticipated to operate at LOS A
during the analyzed peak hours in the 2024 Existing and 2028 No-Build scenarios. With the
addition of site traffic, the intersection is anticipated to continue to operate at LOS A in the 2028
Build scenario. No capacity improvements are recommended at this intersection.
Final Draft
108
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 25 March 2025
4.9 Ramsey Road at Site Access #2
The capacity analysis results for the Ramsey Road at Site Access #2 intersection are summarized
in Table 11.
Table 11 – Ramsey Road at Site Access #2 Capacity Analysis Results
Condition Measure Site Access #2 Ramsey Road Ramsey Road
EBL EBR NBL NBT SBT SBR
AM Peak Hour
2028 Build LOS (Delay) A (8.8) A (7.3)* A (0.0)
Synchro 95th Q 5' 0' 0'
School Dismissal Peak Hour
2028 Build LOS (Delay) A (8.8) A (7.3)* A (0.0)
Synchro 95th Q 3' 3' 0'
PM Peak Hour
2028 Build LOS (Delay) A (8.9) A (7.4)* A (0.0)
Synchro 95th Q 3' 3' 0'
Notes:
* - Left turn delay for major street is reported
An auxiliary turn lane warrant analysis was conducted at Site Access # 2 for the entering
southbound right-turn lane and northbound left-turn lane. SCDOT auxiliary turn lane warrants are
not met; therefore, turn lanes into Site Access #2 are not recommended.
Site Access #2 is recommended to operate as full-movement, under minor street stop -control.
Site Access #2 is recommended to be constructed with a single ingress and a single egress lane.
Final Draft
109
Item 11.
Ramsey Farm Residential Development
Traffic Impact Analysis
Page 26 March 2025
5 Conclusion
The proposed Ramsey Farm Residential Development is located on Assessor’s Parcel Number
R100 028 000 0264 0000 northeast of the Broad River Boulevard at Jennings Road intersection
in Beaufort County, South Carolina. The Ramsey Farm Residential Development is anticipated to
consist of 160 single family detached units and 84 townhome units. The anticipated project traffic
will access the roadway network via two proposed full-movement, stop-controlled intersections.
Site Access #1 will align with the existing Jennings Road at Drafts Way intersection. Site Access
#2 is located along Ramsey Road, approximately one third of a mile south of County Shed Road.
The project is proposed to be constructed and fully occupied by 2028. This study summarizes the
results of the traffic analyses during the AM, School Dismissal, and PM peak hours for 2024
Existing, 2028 No-Build, 2028 Build, and 2028 Build Improved conditions at the following study
intersections:
1.) Broad River Boulevard at Jennings Road
2.) County Shed Road at Jennings Road
3.) Jennings Road at Drafts Way/Site Access #1
4.) Broad River Boulevard at Ramsey Road
5.) County Shed Road at Ramsey Road
6.) Parris Island Gateway at County Shed Road/Ice House Road
7.) Broad River Boulevard at WK Alston Drive
8.) Parris Island Gateway at Broad River Boulevard/Church Access
9.) Ramsey Road at Site Access #2
Traffic operations were evaluated under 2024 Existing, 2028 No-Build, 2028 Build, and 2028 Build
Improved conditions during the AM, School Dismissal, and PM peak hours of travel. With the
addition of traffic associated with the proposed development, the following improvements are
recommended:
Broad River Boulevard at WK Alston Drive
· Construct an eastbound right-turn lane with 200 feet of full width storage and a 150-foot
taper.
o Please note, other nearby developments are contributing to the need for this
improvement in the no-build conditions
Jennings Road at Drafts Way/Site Access #1
· Please note, the capacity analysis contained within this TIA assumes Site Access #1 will
align with Drafts Way. The offset intersection shown in the site plan for Site Access #1,
will not be allowed by Beaufort County. The concept plan will need to be updated to show
Site Access #1 aligning with Drafts Way.
· Site Access #1 is recommended to operate as full-movement, under minor street stop-
control with a single ingress and a single egress lane.
Ramsey Road at Site Access #2
· Site Access #2 is recommended to operate as full-movement, under minor street stop-
control
· Site Access #2 is recommended to be constructed with a single ingress and a single
egress lane.
Final Draft
110
Item 11.
55950342 v4
Prepared By and After Recording Return To:
Walter J. Nester, III
Burr & Forman LLP
23-B Shelter Cove Lane, Suite 400
Hilton Head Island, SC 29928
Development Agreement
For
Ramsey Farms
Beaufort County, South Carolina
_________________________, 2025
111
Item 11.
1
55950342 v4
STATE OF SOUTH CAROLINA ) DEVELOPMENT AGREEMENT
) FOR
COUNTY OF BEAUFORT ) RAMSEY FARMS
THIS DEVELOPMENT AGREEMENT (“Agreement” or “Development Agreement”) is made
and entered as of and on the date last executed by a party (the “Effective Date”), by and between Pulte Home
Company, LLC, a Michigan limited liability company authorized to conduct business in South Carolina, its
successors and assigns (the “Owner”) and Beaufort County, South Carolina, a political subdivision of the
State of South Carolina (“County ” or “Beaufort County”).
WHEREAS, the legislature of the State of South Carolina has enacted the “South Carolina Local
Government Development Agreement Act” (the “Act”) as set forth in Sections 6-31-10 through 6-31-160 of
the South Carolina Code of Laws (1976), as amended; and,
WHEREAS, the Act recognizes that “[t]he lack of certainty in the approval of development can
result in a waste of economic and land resources, can discourage sound capital improvement planning and
financing, can cause the cost of housing and development to escalate, and can discourage commitment to
comprehensive planning.” [Section 6-31-10 (B)(1)]; and,
WHEREAS, the Act further recognizes that: “[d]evelopment agreements will encourage the vesting
of property rights by protecting such rights from the effect of subsequently enacted local legislation or from
the effects of changing policies and procedures of local government agencies which may conflict with any
term or provision of the Development Agreement or in any way hinder, restrict, or prevent the development of
the project. Development Agreements will provide a reasonable certainty as to the lawful requirements that
must be met in protecting vested property rights, while maintaining the authority and duty of government to
enforce laws and regulations which promote the public safety, health, and general welfare of the citizens of
our State.” [Section 6-31-10 (B)(6)]; and,
112
Item 11.
2
55950342 v4
WHEREAS, the Act further authorizes local governments, including county governments, to enter
development agreements with land owners to accomplish these and other goals described in Section 6-31-10
of the Act; and,
WHEREAS, the land that is subject to this Development Agreement includes one (1) tract of land
bearing Beaufort County Tax Map number R100 028 000 0264 0000 consisting of approximately eighty six
point one six (86.16) acres as more fully described in Exhibit “A” attached hereto and incorporated by
reference (hereinafter referred to as the “Property”); and
WHEREAS, the Property is currently zoned Rural [T2R] and is largely undeveloped with the
historical uses of portions of the Property including farming of planted pines; and
WHEREAS, Owner seeks to rezone the to a Hamlet Plat Type designation of the Place Type Overlay
(PTO) described in Section 7.3.50 of the CDC, consisting of T4 Hamlet Center (T4HC) and T3 Hamlet
Neighborhood (T3HN) in conformance with the Comprehensive Plan; and
WHEREAS, the County’s Comprehensive Plan identifies the Property as within a PTO zone and
specifically as a Hamlet Place Type, all as described in the Application for Rezoning for the Property (the
“ZMA”) submitted by the Owner; and
WHEREAS, development of the Property is depicted on a proposed Regulating Plan (defined below)
included with the ZMA and this Agreement and attached hereto as Exhibit “B” and incorporated by
reference; and
WHEREAS, development of the Property includes streets and roads depicted on the Exhibit “B”
Regulating Plan with entrance points from Ramsey Road and Jennings Road. The final location of the access
points shall be determined at the time of development plan submittal; and
WHEREAS, Owner is the contract purchaser of the Property and desires to provide additional
development standards for the Property (the “Project”), all as more particularly described herein, to provide
for and achieve the successful development of the Project pursuant to and as shown in Regulating Plan for the
Property in accordance with the CDC and this Agreement; and
WHEREAS, Owner intends to develop a portion of the Property in coordination with the Beaufort
Jasper Housing Trust (“BJHT”) to provide affordable housing to Beaufort County residents; and
113
Item 11.
3
55950342 v4
WHEREAS, the development of the Property results in the imposition of certain impact fees
(collectively, and not intending to be limiting, hereinafter “impact fees”) in accordance with applicable
Beaufort County ordinances and state law to the extent the development creates new impacts; and
WHEREAS, Owner has agreed to the construction of road infrastructure on and adjacent to the
Property and the dedication of rights-of-way where such road infrastructure has been or shall be constructed
on the Property in partial consideration of credits against any impact fees due to the increase in impacts
resulting from the development during the term of this Agreement; and
WHEREAS, Beaufort County seeks to protect and preserve the natural environment and to secure for
its citizens quality, well planned and designed development and a stable and viable tax base; and
WHEREAS, Beaufort County finds the Project is consistent with Beaufort County's comprehensive
land use plan and shall further the health, safety, welfare and economic well-being of Beaufort County and its
citizens; and
WHEREAS, the plan for the Project presents Beaufort County with an exceptional opportunity to
secure quality planning and a well-constructed residential, mixed-use development; provides for the enhanced
protection of the environment; and strengthens and revitalizes the County’s tax base; and
WHEREAS, this Development Agreement is being made and entered between Owner and Beaufort
County, under the terms of the Act for the purpose of providing assurances to Owner that it may proceed with
its development of the Project under the terms hereof, generally in conformance with the Regulating Plan,
without encountering future changes in law which would materially affect the ability to complete the
proposed development of the Project pursuant to the Regulating Plan, and for the purpose of providing
important protection to the natural environment and long term financial stability and a viable tax base to
Beaufort County.
NOW THEREFORE, in consideration of the terms and conditions set forth herein, and other good
and valuable consideration, including the potential economic benefits to both Beaufort County and Owner by
entering this Agreement, and to encourage well planned development by Owner, the receipt and sufficiency of
such consideration being hereby acknowledged, Beaufort County and Owner hereby agree as follows:
114
Item 11.
4
55950342 v4
I. INCORPORATION.
The above recitals are hereby incorporated into and are made a part of this Agreement, together with
the South Carolina General Assembly findings as set forth under Section 6-31-10(B) of the Act.
II. DEFINITIONS.
As used herein, the following terms mean:
“Act” means the South Carolina Local Government Development Agreement Act, as codified in
Sections 6-31-10 through 6-31-160 of the Code of Laws of South Carolina (1976), as amended.
“County” or “Beaufort County” means the government of Beaufort County, South Carolina, a
political subdivision of the State of South Carolina.
“DHEC” or “SCDHEC” means the South Carolina Department of Health and Environmental
Control.
“Developer” means Owner and its successors and/or assigns or lessees of Owner, any of whom
undertake Development of all or any portion of the Property or who are assigned Development Rights.
“Development” shall have the meaning ascribed to “Development” in Section 10.1.40-D of the
CDC.
“Development Agreement Ordinance” means all terms and conditions of this Development
Agreement and all the attachments thereto, including but not being limited to the Regulating Plan and the
ZMA and all narratives, applications, site development, plans, standards, exhibits and applicable ordinances
as same may be hereafter adopted or amended by mutual agreement of Beaufort County and Owner.
Specifically, it is noted that the adoption of the Development Agreement Ordinance after public hearings shall
constitute a properly adopted land use ordinance. To the extent that any provision of the Development
Agreement Ordinance may be deemed to be a modification of presently existing Beaufort County law, such
modification is hereby approved, ratified and adopted as binding upon the Property and the parties hereto by
the approval of this Development Agreement.
“Development Fees” means any and all road facilities development impact fees incurred in
connection with the Development of all or any portion of the Property, whether or not such road facilities or
system improvements are currently identified in the County’s adopted road capital improvement plans or
other adopted plans, and/or any other similar fee now existing or hereinafter adopted by Beaufort County.
115
Item 11.
5
55950342 v4
“Development Rights” means the vested land use and the rights for the Development of the Property
or portions thereof, to be undertaken by Owner in accordance with the Development Agreement Ordinance
and the Regulating Plan.
“Effective Date” means the date of complete execution of this Agreement after the approval by the
County of the Development Agreement Ordinance.
“Community Development Code of Beaufort County” or “CDC” means the Development Code
of Beaufort County last modified ___________________, and as existing as of the Effective Date.
References in the CDC to the latest version of County manuals shall mean and refer to the latest version of
such manual as of the Effective Date of this Agreement, and shall include any and all zoning ordinances
subsequently adopted or approved by Beaufort County.
“Ramsey Farms” means the Project.
“Lot” or “Lots” means a parcel or parcels of land depicted in a subdivision plat for all or portions of
the Property prepared in conformance with the Regulating Plan, this Development Agreement or a
development plan approved by the County.
“Owner” means Pulte Home Company, LLC a Michigan limited partnership and its successors,
successors in interest, assigns and or any other person, organization or company holding title to all or a
portion of the Property.
“Parcel” means the Property.
“Place Type Overlay” or “PTO” means the proposed zoning for the Property as described in the
Application for a Zoning Map Amendment submitted by the Owner concurrent with this Development
Agreement. The PTO is described in Section 7.3.50 of the CDC.
“Project” means the Development of the Property as contemplated in this Development Agreement
and the Regulating Plan.
“Property” means the tract of land depicted and legally described on Exhibits “A” attached hereto
and made a part hereof.
“Regulating Plan” means that certain site plan for the Property prepared by J.K. Tiller Associates,
Inc. dated September 5, 2024, and related material and exhibits, depicting proposed parcels and other
infrastructure for the Property’s proposed development and which constitute vested Development Rights (as
116
Item 11.
6
55950342 v4
hereinafter defined) under this Agreement and the Act with respect to all applicable zoning and land
development requirements under the County Land Development Regulations and the CDC, and which have
been reviewed and approved by the County in conjunction with the approval of this Development Agreement,
which Regulating Plan is attached hereto as Exhibit “B” and made a part hereof. The Regulating Plan
depicts the individual Parcels and describes the development rights for each Parcel on the Property.
Development of the Property shall generally be in conformance with the Regulating Plan but the Applicant
reserves the right to revise based on site, development and economic conditions during the Term of this
Agreement.
“Traffic Impact Analysis” or “TIA” means
“Term” means a period of five (5) years and two (2) additional five (5) year Terms, if extended as set
forth in S.C. Code Section 6-31-40 and Article III of this Agreement.
“ZMA” or “Zoning Map Amendment” means the application for the rezoning of the Property
submitted by the Owner concurrent with and intending to be approved together with this Development
Agreement.
III. TERM.
The Term of this Agreement shall commence on the Effective Date and terminate five (5) years
thereafter; provided that the Term shall without notice from any Party be renewed for up to two (2) additional
periods of five (5) years each (each a “Renewal Term”) unless the County delivers written notice to the
Owner at least ninety (90), and no more than one hundred eighty (180), days prior to the expiration of the
then-current Term or Renewal Term of its good faith basis objection to the renewal and the reasonable
action(s) necessary to be taken to renew (an “Objection Notice”), or unless the Owner or its assignee delivers
written notice to Beaufort County not less than ninety (90) days prior to the expiration of the then- current
Term or Renewal Term, as applicable, of its intent to terminate this Agreement. In the event that the County
delivers an Objection Notice as set forth herein, Owner shall have no less than ninety (90) days to cure such
objection, and provided that so long as Owner is diligently proceeding to cure the objection, Owner shall be
entitled to extensions of time as reasonably necessary to effect such cure. During such cure period the Term
shall continue and upon completion of such cure the Renewal Term will commence. During the Term, the
provisions of this Development Agreement shall be vested against any future changes to applicable Beaufort
County land development regulations and law or ordinances which would affect the ability of Owner to carry
out the development approved in this Development Agreement. Further, at the end of the five (5) year period,
the provisions of this Development Agreement shall be vested against any applicable future changes to
117
Item 11.
7
55950342 v4
Beaufort County law or ordinances if Owner shall have achieved Substantial Development. “Substantial
Development” shall mean the construction of at least (For Discussion) single or multifamily units.
The foregoing obligation to achieve Substantial Development within five (5) years shall be tolled during any
period of Force Majeure.
IV. DEVELOPMENT OF THE PROPERTY.
A. The Property shall be developed in accordance with this Development Agreement, the
Regulating Plan, and as described in the ZMA. Except as otherwise set forth herein
Development of the Property shall be in accordance with consistent with the PTO as set forth
in the CDC as of the date hereof.
B. Beaufort County agrees that Owner shall develop the Project in phases in accordance with
the Development Schedule (as hereinafter defined).
C. To the extent allowed by applicable law, Owner may submit these items for concurrent
review by Beaufort County and other governmental authorities.
V. CHANGES TO THE CDC.
Any amendment or modification to the CDC, including any new or successor zoning and
development standards ordinances adopted by Beaufort County, shall not be applicable to the Property
without the express prior written consent of Owner and any Developer; provided, however, that the
subsequently adopted laws and/or ordinances will apply to the Property if enacted pursuant to all proper
procedures set forth in applicable statutes and ordinances, including but not limited to requisite notices,
required hearings and making required findings that : (a) the amendments or modifications are not in conflict
with laws governing this Agreement and do not prevent the Development approved in this Agreement; (b) the
amendments or modifications are essential to public health, safety or welfare, and the subsequently adopted
laws and/or ordinances expressly state that they apply to the Development of the Property; (c) the
amendments or modifications are specifically anticipated and provided for in the Development Agreement;
(d) the County has demonstrated that substantial changes have occurred to pertinent conditions regarding the
Property existing as of the Effective Date and if not addressed by the County would pose a serious health risk
to the public health, safety and welfare of its citizens; or (e) the Development Agreement is based on
substantially inaccurate information supplied by Owner. If the CDC or any new or successor zoning and
development standards ordinances are adopted by Beaufort County after the date of this Agreement that
would materially adversely affect Developer’s right to use the Property as set forth in this Agreement or the
118
Item 11.
8
55950342 v4
Regulating Plan, or that would appreciably increase Developer’s cost to use the Property, such provisions
shall not apply with respect to the Property. Owner does, for itself and its successors and assigns, and
notwithstanding the CDC, agree to be bound by the following:
A. Owner shall be required to notify Beaufort County, in writing, as and when all or a portion of
the Development Rights granted or created by this Agreement are transferred to any
Developer. Such information shall include the identity and address of the Transferee (as
hereinafter defined), a proper contact individual, and the location and number of acres of the
Property for which Development Rights are being transferred. Developers transferring
Development Rights to any other party shall be subject to this requirement of notification,
and any entity acquiring Development Rights hereunder shall be subject to the requirements
of Article XVIIG.
B. Owner agrees that all Development on the Property, with the exception of irrigation and
incidental maintenance facilities, shall be served by potable water and sewer prior to
occupancy, except for temporary use. Wells for potable water and septic facilities for sewer
will be permitted and constructed in accordance with applicable DHEC standards.
VI. DEVELOPMENT SCHEDULE.
The Project shall be developed in accordance with the development schedule, attached hereto as
Exhibit “C” and made a part hereof (the “Development Schedule ”), as the same may be modified or
amended by Owner or any Developer(s) in the future to reflect market conditions as determined in the sole
discretion of Owner or any Developer with respect to assigned Development Rights. The Property is intended
to be developed in multiple phases based on economic and sales and development conditions. In accordance
with the Act, the failure of Owner or any Developer with assigned Development Rights to meet the
Development Schedule shall not, in and of itself, constitute a material breach of this Agreement. The failure
to meet the Development Schedule shall be judged by the totality of circumstances, including but not limited
to Owner's and/or Developer’s good faith efforts to attain compliance with the Development Schedule,
matters Force Majeure and similar events. The fact that Development of the Property may take place at a
different pace, based on future market conditions, as determined in the sole reasonable discretion of Owner or
any Developer with respect to assigned Development Rights, is expected and shall not be a default hereunder.
Furthermore, periodic adjustments to the Development Schedule, which may be submitted to the County by
Owner or Developer(s) in the future, shall not be considered a major or material amendment or breach of this
Agreement.
119
Item 11.
9
55950342 v4
VII. DENSITY AND USE.
Beaufort County and the Owner agree that the Property may be developed with uses and densities set
forth in the Regulating Plan and described in the ZMA. All types of residential uses allowed in the PTO
described in the ZMA are permitted for purposes of this conversion.
VIII. ACCESS, TRAFFIC, SYSTEM IMPROVEMENTS, CREDITS AND CONTRIBUTIONS.
In addition to all other covenants, conditions and agreements set forth in this Agreement, the
following are hereby agreed upon by the parties:
A. Access. All public roads outside the Property that serve the Property with the exception of
Jennings Road, which is owned by the Beaufort County School Board, are owned and
maintained by the South Carolina Department of Transportation (“ SCDOT”) and all
ordinances, codes and regulations of the State of South Carolina and Beaufort County, as
applicable, regarding access and use of such public roads shall apply. The roads and
alleyways within the Property will be private roads. Further, except for Jennings Road, the
County shall not be responsible for construction or maintenance of the public roads which
now or hereafter serve the Property, unless otherwise agreed by the County in writing. The
County's acceptance of any proffered dedication of a road as a public road shall be subject to
compliance with the County's procedures for dedication and road acceptance, as such may be
adopted and revised from time to time by the County.
B. System Improvements . Additional public roads within or serving the Property may be
planned in the future, subject to written agreement between the affected Owners and the
County. The affected Owners shall have the right to design and construct, upon obtaining
permits from applicable governmental authorities, roadways designated at the development
plan stage, provided such design is in conformance with and capable of absorbing the traffic
loading created by the Development within an approved development plan within the
Property. To the extent practical, Owners will utilize construction access points and
temporary construction roads to minimize the use by construction vehicles and construction
supply trucks of the public roads to be constructed, to avoid undue wear and tear. Access
points must meet the requirements of the SCDOT and the County and will be based upon
Traffic Impact Analysis during the development plan approval for specific areas or phases of
the Property.
120
Item 11.
10
55950342 v4
C. Credits and Contributions.
1. Dedications. The County's acceptance of any proffered dedication of a road as a
public road shall be subject to compliance with the County's procedures for
dedication and road acceptance, as such may be adopted and revised from time to
time by the County.
2. No Other Dedications or Conveyances . Except with respect to the dedications
and/or conveyances of the properties referred to in this Article VIII, no other
dedications or conveyances of lands for public facilities shall be required in
connection with the development of the property.
3. Development Fees.
(i) Beaufort County acknowledges that in partial consideration of the cost of
the Road Facilities Improvements thereon as described in Article VIII
herein (collectively herein the “ System Improvements ”) and
notwithstanding any provision to the contrary contained within this
Agreement, Owner shall receive a credit against the cost of any and all
Development Fees up to the total value of the System Improvements.
(ii) Beaufort County or other governing body shall not be precluded by this
Agreement from charging fees for delivery of services to citizens or
residents (i.e., an EMS response fee or the like), nor from charging fees
statutorily authorized in the future (i.e., a real estate transfer fee or the like)
which are not collected as a prerequisite to approval of a plat, plan or
construction permit and not otherwise contemplated hereunder.
(iii) The Development Fees are vested for the entire Property and no other
Development Fee or obligation regarding Development is imposed in
connection with the Property.
IX. EFFECT OF FUTURE LAWS.
Owner and Developer(s) shall have vested rights to undertake Development of any portion or all of
the Property in accordance with the Development Agreement Ordinance. Future enactments of, or changes or
amendments to Beaufort County ordinances, including the CDC, shall not apply to the Property unless the
121
Item 11.
11
55950342 v4
same are adopted in accordance with Article V of this Development Agreement or unless Owner and any
Developer(s) consent to such enactment, change or amendment.
Beaufort County agrees that the Regulating Plan for the Project and ZMA have been approved and
Owner’s rights to develop the Property in accordance with this Development Agreement are fully vested with
regard to intensity, density, Development Fees, uses, height, restrictions, setbacks, parking and signage as set
forth in the Regulating Plan and the Development Agreement Ordinance, and Owner shall not have any
obligations to Beaufort County for on or off site transportation or other facilities or improvements other than
as specifically provided in this Agreement and its related documents such as the Development Agreement
Ordinance. Beaufort County shall not impose additional development obligations or regulations in
connection with the ownership or development of the Property, except in accordance with the procedures and
provisions of § 6-31-80 (B) of the Act, which the Owner shall have the right to challenge.
The parties specifically acknowledge that this Agreement shall not prohibit the application of any
present standard building, housing, electrical, plumbing or gas codes or future codes in compliance with
Section 6-31-160 of the Act, or any tax or fee of general application throughout Beaufort County. No future
development and/or aid to construction, impact fees or Property- specific special assessments imposed by
Beaufort County shall apply to the Property or the Project without the consent of the Owner.
X. INFRASTRUCTURE AND SERVICES.
Beaufort County and Owner recognize that the majority of the direct costs associated with the
development of the Property will be borne by Owner with respect to their respective portions thereof but that
other necessary services for landowners and residents within the Property shall be provided by other
governmental or quasi -governmental entities, and not by Beaufort County. For clarification, the parties
acknowledge the following:
A. Private Roads . Any roads proposed to be constructed within the Property shall be
constructed by Owner and/or Developers, and dedicated for maintenance to other appropriate
entities such as a property or homeowners association formed for all or portions of the
Property. Beaufort County shall not be responsible for the construction or maintenance of
any roads within the Property, unless the County specifically agrees to do so in the future.
B. Public Roads.
(i) The Property shall be served by direct access from Jennings Road and Ramsey Road
as shown on the Regulating Plan.
122
Item 11.
12
55950342 v4
(ii) The location of public access points to the Property, median cuts in the right-of-way,
and signage shall be as set forth in the Regulating Plan or any revisions thereto at the
time of any development plan review for any Phase of the Property by the County.
C. Potable Water . Owner and/or Developers, to the extent necessary and not currently
existing, may construct or cause to be constructed all necessary water service infrastructure
within the Property at Owner’s and/or Developer’s cost, which infrastructure shall be owned
and maintained by Owner or Beaufort Jasper Water and Sewer Authority (“BJWSA”) and
may be conveyed to BJWSA as may be required by BJWSA.
D. Sewage Treatment and Disposal . Sewage treatment and disposal may be provided by
BJWSA. Owner and/or Developers, to the extent necessary and not currently existing, shall
construct or cause to be constructed all necessary sanitary sewer service infrastructure within
the Property at Owner’s and/or Developer’s cost, which infrastructure shall be owned and
maintained by Owner or BJWSA and may be conveyed to BJWSA as may be required by
BJWSA. Septic facilities for sewer shall be authorized for the PTO subject to applicable
DHEC regulations and permitting.
E. Stormwater Treatment and Disposal . Stormwater treatment and disposal shall be in
accordance with the applicable law and regulations existing as of the date of this Agreement.
F. Public Financing. Owner (for itself or in concert with other Developers or interested
parties) reserves the right to engage in joint planning and financing of public infrastructure
for the mutual benefit of the County and Owner. The details of such public infrastructure
may be included in the ZMA, this Development Agreement or other agreement as mutually
agreed to by the County and Owner.
G. Other Services / Future Agreements. Development within the Property shall be served
and entitled to any and all Beaufort County services, such as fire protection and police
protection, provided to other property within the County, with the understanding that the
Property, except as otherwise herein provided, shall be subject to all Beaufort County taxes
of universal application, as well as any special service district taxes which may apply to all
other existing properties and development within the area. Normal and customary County
services shall be provided to owners and residents within the Property on the same basis as
all other property in Beaufort County.
123
Item 11.
13
55950342 v4
XI. DEVELOPMENT STANDARDS.
Development standards for the Project shall be as set forth in the Regulating Plan, the ZMA and
this Agreement.
A. Criteria for approval.
Section 7-3-40 of the CDC sets forth the criteria for approval of an amendment to the
Beaufort County Zoning Map. No petition to change the text of the CDC or Zoning Map
applicable to the Property shall succeed except:
(i) Where necessary to implement the land use plan update;
(ii) To correct an original mistake or a manifest error in the regulations or map;
(iii) To recognize substantial change or changing conditions or circumstances in a
particular locality; or
(iv) To recognize changes in technology, the style of living, or the manner of doing
business.
Owners may apply for variances to the Zoning Map through the application process set forth
in the CDC from time to time and those applications are not governed by this Agreement or
any document under the Development Agreement Ordinance.
B. Use Restrictions.
Upon approval of this Agreement and prior to the approval of any development on the
Property the Owner shall record restrictive land use covenants concerning certain uses on all
or portions of the Property. These restrictions shall be covenants running with the land and
title thereto enforceable by any owner, the County or any property owner association to be
formed to manage the Property or portions thereof.
(i) Workforce Housing: 10 single family units within the Property shall be developed for
workforce housing and capped at 80-120% of area median income.
124
Item 11.
14
55950342 v4
(ii) Restrictive Covenants. Property subject to the workforce housing requirement will be
conveyed subject to restrictions as described in Exhibit “D” attached hereto and
incorporated herein.
(iii) First Time Homebuyer Credit. Property subject to the workforce housing requirement
will also require a closing credit/down payment assistance be applied to first time
homebuyers in the amount of up to $2,500.00. This credit shall be paid in coordination
with BJHT. BJHT shall screen all first time homebuyers to ensure compliance with the
criteria for workforce housing.
(iv) Rehabilitation Fees . Developer agrees to provide up to $750.00 per unit towards
rehabilitation of existing local structures in the vicinity of the development.
Rehabilitation fees shall be paid to BJHT by the Developer upon issuance of a building
permit.
XII. OWNER ENTITLEMENTS, VESTED RIGHTS. NOTE: FOR DISCUSSION
Beaufort County acknowledges that Owner is vested with the following approvals:
A. Development Standards. Subject to the terms and conditions of this Agreement, Beaufort
County agrees that the Property is vested with the various rights set forth in this Agreement,
the ZMA and the Regulating Plan, and that the density, uses, buffers, access and all other
matters shown and described therein and in this Agreement, are approved.
B. Approved Variances from the CDC.
(i) Architectural Standards.
(1) T4HC: Approved architectural standards for the T4HC portions of the
Property shall comply with the “XXXX” standards described in Exhibit
“E” attached hereto and incorporated herein;
(2) T3HC: Approved architectural standards for the T3HC portions of the
Property shall comply with the following standards: “XXXX” attached
hereto as Exhibit “F-1”, “XXXX” attached hereto as Exhibit “F-2”,
“XXXX” attached hereto as Exhibit “F-3”, “XXXX” attached hereto as
Exhibit “F-4”, “XXXX” attached hereto as Exhibit “F-5”, and
“XXXX” attached hereto as Exhibit “F-6”.
(ii) Back Streets.
125
Item 11.
15
55950342 v4
C. Access. Beaufort County hereby approves the location of points of access to the Property as
shown in the Regulating Plan, subject to SCDOT permitting and approval, if any.
D. Other Services. Beaufort County services, including, but not limited to, police, fire, and
other governmental services shall be supplied to the Property in the same manner and to the
same extent as provided to other properties within Beaufort County. In the event Owner
requires enhanced services beyond those which are routinely provided within Beaufort
County, Beaufort County agrees that upon the written request of Owner, it shall negotiate in
good faith with Owner to provide such enhanced services to the Property.
D. Vested Rights. Beaufort County agrees that the Property is approved and fully vested for
intensity, commercial density, Development Fees, uses and height, setbacks, parking and
signage as set forth in the Development Plan and the Development Agreement Ordinance,
and shall not have any obligations for on or off site transportation or other facilities or
improvements other than as specifically provided in this Agreement, but shall adhere to the
Regulating Plan. Beaufort County shall not impose additional development obligations or
regulations in connection with the ownership or development of the Property, except in
accordance with the procedures and provisions of § 6-31-80 (B) of the Act, which Owner
shall have the right to challenge.
XIII. DEFAULTS.
The failure of Owner, the Developer or Beaufort County to comply with the terms of this Agreement
shall constitute a default, entitling the non-defaulting party to pursue such remedies as deemed appropriate,
including specific performance and the termination of this Development Agreement in accordance with the
Act; provided however no termination of this Development Agreement may be declared by Beaufort County
absent affording Owner and any applicable Developer the notice, hearing and opportunity to cure in
accordance with the Act; and provided further that nothing herein shall be deemed or construed to preclude
Beaufort County or its designee from issuing stop work orders or voiding permits issued for Development
when such Development contravenes the provisions of the Development Agreement Ordinance. Owner, or its
designee, shall meet with Beaufort County’s Planning Director and Economic Development Director, at least
once per year, at a time reasonably agreeable to the parties, during the Term of this Agre ement to review
development completed in the prior year and the development anticipated to be commenced or completed in
the ensuing year. Owner, or its designee, shall be required to provide such information as may reasonably be
requested, to include, but not be limited to, commercial square footage completed, residential dwelling units
126
Item 11.
16
55950342 v4
completed, and any relevant information regarding the Development. This compliance review shall be in
addition to, and not in lieu of, any other reporting or filing required by this Agreement, if any. If, as a result
of a compliance review, Beaufort County determines that Owner has committed a material breach of the terms
of this Development Agreement, Beaufort County shall serve such party in writing notice of such breach
pursuant to the procedures set forth in Section 6 -31-90 (B) of the Act, affording the breaching party the
opportunity to respond as set forth in Section 6-31-90 (C) of said Act.
XIV. MODIFICATION OF AGREEMENT.
This Development Agreement may be modified or amended only by the written agreement of
Beaufort County and Owner and Developer, as applicable pursuant to the requirements for amendments to
development agreements. No statement, action or agreement hereafter made shall be effective to change,
amend, waive, modify, discharge, terminate or effect an abandonment of this Agreement in whole or in part
unless such statement, action or agreement is in writing and signed by the party against whom such change,
amendment, waiver, modification, discharge, termination or abandonment is sought to be enforced.
XV. NOTICES.
Any notice, demand, request, consent, approval or communication which a signatory party is required
to or may give to another signatory party hereunder shall be in writing and shall be delivered or addressed to
the other at the address below set forth or to such other address as such party may from time to time direct by
written notice given in the manner herein prescribed, and such notice or communication shall be deemed to
have been given or made when received if delivered by personal delivery or by independent courier service or
if by mail on the third (3rd) business day after the deposit thereof in the United States Mail, postage prepaid,
registered or certified, addressed as hereinafter provided or the next business day if sent by recognized natural
overnight courier such as FedEx. All notices, demands, requests, consents, approvals or communications
shall be addressed as follows:
To Beaufort County: Office of Beaufort County Administrator
c/o County Administrator
Beaufort County Administration Building
100 Ribaut Road
Beaufort, SC 29902
With Copy To: Beaufort County Legal Department
c/o County Attorney
102 Industrial Village, Bldg. 2
Beaufort, SC 29901
127
Item 11.
17
55950342 v4
And to Owner: Pulte Home Company, LLC
c/o PulteGroup Inc.
Attn: Graham Hawkins
4401 Leeds Avenue, Suite 400
North Charleston, SC 29405
With Copy To: Walter J. Nester, III
Burr & Forman LLP
23-B Shelter Cove Lane, Suite 400
Hilton Head Island, SC 29928
XVI. ENFORCEMENT.
Any party hereto shall have the right to enforce the terms, provisions and conditions of the Agreement
by any remedies available at law or in equity, including specific performance.
XVII. GENERAL.
A. Subsequent Laws. In the event state or federal laws or regulations are enacted after the
execution of this Development Agreement or decisions are issued by a court of competent
jurisdiction which prevent or preclude compliance with the Act or one or more provisions of
this Agreement (“New Laws ”), the provisions of this Agreement shall be modified or
suspended as may be necessary to comply with such New Laws. Immediately after
enactment of any such New Laws, or court decision, Owner and any Developer (with respect
to assigned rights) and Beaufort County shall meet and confer in good faith in order to agree
upon such modification or suspension based on the effect such New Laws would have on the
purposes and intent of this Agreement. During the time that these parties are conferring on
such modification or suspension or challenging the New Laws, Beaufort County may take
reasonable action to comply with such New Laws. Should these parties be unable to agree to
a modification or suspension, either party may petition a court of competent jurisdiction for
an appropriate modification or suspension of this Agreement. In addition, Owner and any
Developer with respect to assigned rights, and Beaufort County each shall have the right to
challenge the New Laws preventing compliance with the terms of this Agreement. In the
event that such challenge is successful, this Agreement shall remain unmodified and in full
force and effect.
B. Estoppel Certificate. Beaufort County and Owner may, at any time, and from time to time,
deliver written notice to the other applicable party requesting such party to certify in writing:
128
Item 11.
18
55950342 v4
(i) that this Agreement is in full force and effect,
(ii) that this Agreement has not been amended or modified, or if so amended,
identifying the amendments,
(iii) whether, to the knowledge of such party, the requesting party is in default or claimed
default in the performance of its obligations under this Agreement, and, if so,
describing the nature and amount, if any, of any such default or claimed default, and
(iv) whether, to the knowledge of such party, any event has occurred or failed to occur
which, with the passage of time or the giving of notice, or both, would constitute a
default and, if so, specifying each such event.
C. Entire Agreement. This Agreement sets forth, and incorporates by reference all of the
agreements, conditions and understandings between Beaufort County and Owner relative to
the Property and its Development and there are no promises, agreements, conditions or
understandings, oral or written, expressed or implied, among these parties relative to the
matters addressed herein other than as set forth or as referred to herein.
D. No Partnership or Joint Venture. Nothing in this Agreement shall be deemed to create a
partnership or joint venture between Beaufort County and Owner or to render such party
liable in any manner for the debts or obligations of another party.
E. Exhibits. All exhibits attached hereto and/or referred to in this Agreement are incorporated
herein as though set forth in full.
F. Successors and Assigns.
(i) Binding Effect. This Agreement shall be binding upon Owner’s successors and
assigns in the ownership or Development of any portion of the Property. Except for
Owner’s continuing obligation as specifically stated in Article XVIIG(ii)(1) and
(G)(iii) below, a purchaser or a party acquiring title to any portion of the Property or
a party to whom Owner assigns Development Rights with respect to any portion of
the Property (herein collectively referred to as a “ Transferee”) shall, during the
Term of this Agreement, be solely responsible for the performance of Owner’s
obligations and entitled to the assigned Development Rights under this Development
Agreement applicable to the portion of the Property transferred, or for which
129
Item 11.
19
55950342 v4
Development Rights are transferred. Each Transferee shall be required to execute a
written acknowledgement assuming Owner’s obligations under this Agreement,
which are directly applicable to such portion of the Property. Such acknowledgment
shall be in the form provided in Exhibit “G” attached hereto and made a part hereof
(the “ Notice of Transfer ”), and provided to Beaufort County at the time of
recording any instrument transferring title, and development rights, of the Property
or any portion of the Property. This Section shall not be construed to prevent Owner
from obtaining indemnification of liability to Beaufort County from Transferees.
Except as specifically set forth in Article XVIII G (ii)(1) and G (iii) below, and in
accordance with applicable law, upon transfer to a Transferee, Owner shall be
released of all obligations assumed by such Transferee as to such portion of the
Property.
(ii) Transfer of all of the Property . Owner shall be entitled to transfer all or any
portion of the Property to a Transferee subject to the following requirements:
(1) Notification to County. When Owner transfers all or any portion of the
Property to a Transferee, Owner shall be responsible for delivering, or
causing to be delivered, to Beaufort County the Notice of Transfer together
with the name, address, telephone number, e -mail address and contact
person for the Transferee.
(2) Assignment of Development Rights. Any and all conveyances of all or
any portion of the Property to a Transferee shall be by a recordable
instrument with a covenant running with the land expressly stating the
precise amount of density assigned to the Transferee, in a form similar to
Exhibit “G” attached hereto and incorporated herein.
(iii) Mortgage Lenders. Notwithstanding anything to the contrary contained herein, the
requirements to transfer contained in this Article XVIII(G) concerning successors
and assigns shall apply: (i) to any mortgage lender upon acquiring title to the
Property or any portion thereof, either as a result of foreclosure of mortgage secured
by any portion of the Property or to any other transfer in lieu of foreclosure; (ii) to
any third-party purchaser at such foreclosure; or (iii) to any third-party purchaser of
such mortgage lender’s interest subsequent to the mortgage lender’s acquiring
130
Item 11.
20
55950342 v4
ownership of any portion of the Property. Nothing contained herein shall prevent,
hinder, or delay any transfer of any portion of the Property to any such mortgage
lender or subsequent purchaser.
G. Assignment. Subject to the terms hereof, Owner may assign its rights and responsibilities
hereunder to subsequent land owners and Developers.
H. Governing Law. This Agreement shall be governed by the laws of the State of South
Carolina.
I. Counterparts. This Agreement may be executed in several counterparts, each of which
shall be deemed an original, and such counterparts shall constitute but one and the same
instrument.
J. Eminent Domain. Nothing contained in this Agreement shall limit, impair or restrict
Beaufort County's right and power of eminent domain under the laws of the State of South
Carolina.
K. No Third Party Beneficiaries. The provisions of this Agreement may be enforced only by
Beaufort County, Owner and Developers. No other persons shall have any rights hereunder.
L. Attorneys’ Fees and Costs. Each party to this Agreement agrees to pay their own fees and
costs incurred by them.
XVIII. STATEMENT OF REQUIRED PROVISIONS.
A. Specific Statements. The Act requires that a development agreement must include certain
mandatory provisions, pursuant to Section 6-31-60 (A). Although certain of these items are
addressed elsewhere in this Agreement, the following listing of the required provisions is set
forth for convenient reference. The numbering below corresponds to the numbering utilized
under Section 6-31-60 (A) for the required items:
(i) Legal Description of Property. The legal description of the Property is set forth in
Exhibit “A” attached hereto and made a part hereof.
(ii) Duration of Agreement. The duration of this Agreement is five (5) years.
131
Item 11.
21
55950342 v4
(iii) Permitted Uses, Densities, Building Heights and Intensities. A complete listing
and description of permitted uses, population densities, building intensities and
heights, as well as other development -related standards, are contained in the
Development Agreement Ordinance.
(iv) Required Public Facilities . The utility services that will be available to the
Property are described in Article X. The mandatory procedures of the Development
Agreement Ordinance will ensure availability of public access and utilities to serve
the Property.
(v) Local Development Permits. The Development standards for the Property shall be
as set forth in the Development Agreement Ordinance. Specific permits must be
obtained prior to commencing Development, consistent with the standards set forth
in the Development Agreement Ordinance. Building Permits must be obtained
under applicable law for any construction. It is specifically understood that the
failure of this Agreement to address a particular permit, condition, term or restriction
does not relieve Owner or its successors and assigns of the necessity of complying
with the law governing the permitting requirements, conditions, terms or
restrictions, unless otherwise provided in the Development Agreement Ordinance.
(vi) Comprehensive Plan and Development Agreement. Beaufort County agrees that
the Development permitted and proposed under the Development Agreement
Ordinance is consistent with the Comprehensive Plan and with the development
regulations of Beaufort County, South Carolina, in effect as of the date of this
Agreement.
(vii) Terms for Public Health, Safety and Welfare. The Council for Beaufort County
finds that all issues relating to public health, safety and welfare have been
adequately considered and appropriately addressed under the terms of the
Development Agreement Ordinance and existing laws.
(viii) Historical Structures. No historical structures or features are present on the
Property and therefore no specific terms relating to historical structures are pertinent
to this Development Agreement.
[Signatures on following pages]
132
Item 11.
55950342 v4
IN WITNESS WHEREOF, the parties hereby set their hands and seals, effective as of the Effective
Date.
WITNESSES: OWNER:
PULTE HOME COMPANY, LLC
a Michigan limited liability company authorized to
conduct business in South Carolina
_____________________________ ___________________________________
By:
_____________________________ Its:
STATE OF )
) ACKNOWLEDGMENT
COUNTY OF )
I HEREBY CERTIFY, that on this ____ day of ___________, 20___, before me, the undersigned
Notary Public of the State and County stated below, personally appeared known to
me (or satisfactorily proven) to be the person whose name is subscribed to the within document, who
acknowledged the due execution of the foregoing document in the capacity indicated.
IN WITNESS WHEREOF, I have hereunto set my hand and official seal the day and year last
above mentioned.
___________________________________
Notary Public for
My Commission Expires: ____________
(Affix Notary Seal)
133
Item 11.
55950342 v4
WITNESSES: BEAUFORT COUNTY, SOUTH CAROLINA
_____________________________ ___________________________________
By:
_____________________________ Its:
STATE OF SOUTH CAROLINA. )
) ACKNOWLEDGMENT
COUNTY OF BEAUFORT )
I HEREBY CERTIFY , that on this ____ day of ______________, 20___, before me, the
undersigned Notary Public of the State and County aforesaid, personally appeared
___________________________, known to me (or satisfactorily proven) to be the person whose name is
subscribed to the within document, as the appropriate official of Beaufort County, South Carolina, who
acknowledged the due execution of the foregoing document.
IN WITNESS WHEREOF, I have hereunto set my hand and official seal the day and year last
above mentioned.
___________________________________
Notary Public for South Carolina
My Commission Expires: ____________
(Affix Notary Seal)
134
Item 11.
55950342 v4
EXHIBIT “A”
Property Description
135
Item 11.
55950342 v4
EXHIBIT “B”
Regulating Plan
136
Item 11.
55950342 v4
EXHIBIT “C”
Development Schedule
Development of the Property is expected to occur in Phases over the Term of the Development
Agreement, with the sequence and timing of development activity to be dictated largely by market conditions.
YEAR RESIDENTIAL (DWELLING UNITS)
2027 90
2028 84
2029 70
137
Item 11.
55950342 v4
EXHIBIT “D”
BJHT RESTRICTIVE COVENANT
138
Item 11.
55950342 v4
EXHIBIT “E”
ARCHITECTURAL GUIDELINES – XXXX
139
Item 11.
55950342 v4
EXHIBIT “F”
ARCHITECTURAL GUIDELINES – XXXX
140
Item 11.
55950342 v4
EXHIBIT “F-1”
ARCHITECTURAL GUIDELINES – XXXX
141
Item 11.
55950342 v4
EXHIBIT “F-2”
ARCHITECTURAL GUIDELINES – XXXX
142
Item 11.
55950342 v4
EXHIBIT “F-3”
ARCHITECTURAL GUIDELINES – XXXX
143
Item 11.
55950342 v4
EXHIBIT “F-4”
ARCHITECTURAL GUIDELINES – XXXX
144
Item 11.
55950342 v4
EXHIBIT “F-5”
ARCHITECTURAL GUIDELINES – XXXX
145
Item 11.
55950342 v4
EXHIBIT “F-6”
ARCHITECTURAL GUIDELINES – XXXX
146
Item 11.
55950342 v4
EXHIBIT “G”
STATE OF SOUTH CAROLINA ) NOTICE OF TRANSFER AND
) PARTIAL ASSIGNMENT AND ASSUMPTION
) OF RIGHTS AND OBLIGATIONS UNDER
COUNTY OF BEAUFORT ) DEVELOPMENT AGREEMENT
THIS NOTICE OF TRANSFER AND PARTIAL ASSIGNMENT AND ASSUMPTION OF
RIGHTS AND OBLIGATIONS UNDER DEVELOPMENT AGREEMENT (“Partial Assignment” is
dated this ____ day of ________________, 20___, by and between Pulte Home Company, LLC, a Michigan
limited liability company authorized to conduct business in South Carolina (“Assignor”), and
, a ________________________________ (“Assignee”).
WITNESSETH:
WHEREAS, on or about the _____ day of __________________, 20___, Assignor entered into a
Development Agreement (“Development Agreement”) with Beaufort County, South Carolina, incident to the
development of certain real property known as Project ______________, which Development Agreement, as
amended, controls the Property (as defined herein); and
WHEREAS, Assignor entered into an Agreement For Purchase And Sale (“Agreement ”) with
Assignee dated ______________, 20___ providing for the sale by Assignor and the purchase by Assignee of
certain real property being more particularly described on Exhibit “A” attached hereto and made a part
hereof (the “Property”); and
WHEREAS, an integral part of the conveyance of the Property by Assignor to Assignee, it is the
desire and intention of Assignor to assign to Assignee, and it is the desire and intention of Assignee to
assume, certain rights, privileges, and obligations under the terms of the Development Agreement applicable
to the Property, thus necessitating the preparation and execution of this Partial Assignment.
NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy whereof is
herewith acknowledged, parties hereby agree as follows, to writ:
1. Partial Assignment and Assumption of Rights, Privileges and Obligations Applicable to the
Property Pursuant to the Development Agreement. Assignor does hereby transfer, assign, convey and deliver
unto Assignee, its successors and assigns, such rights for the land uses on the Property that are defined in the
Development Agreement (the “Assigned Land Use”). Assignee shall be entitled to all of the privileges and
obligations as described in the Development Agreement applicable for the Assigned Land Use to the Property
except for those certain excluded obligations, rights and privileges (“ Excluded Obligations”) identified
herein below, if any. Assignor is hereby released from and Assignee hereby assumes and agrees to perform
all of Assignor’s rights, privileges and obligations as described in the Development Agreement applicable to
147
Item 11.
55950342 v4
the Assigned Land Use for the Property, except for the Excluded Obligations, if any. Assignee acknowledges
receipt of the Development Agreement and all Exhibits thereto and with respect to the Assigned Land Use
and the Property agrees to be bound by the terms thereof, and to develop the Property in accordance with such
terms. The rights and obligations hereby assigned and assumed shall be covenants running with the land,
binding upon the parties hereto and their successors and assigns.
2. Estoppel Certificate. Pursuant to Article XVIII of the Development Agreement, Assignor
hereby certifies the following, to wit:
a. that the Development Agreement, as amended, is in full force and effect;
b. that the Development Agreement has not been further amended or modified (or if it
has the date of such amendment or modification);
c. that to the best knowledge of Assignor, all parties to the Development Agreement
are in full compliance with all obligations there under as of the date hereof; and
d. that to the best knowledge of Assignor, no event has occurred or failed to occur
which, with the passage of time or the giving of notice, or both, would constitute an
event of default under the terms of the Development Agreement.
3. Notices. Any notice, demand, request, consent, approval, or communication among any of
the parties hereto or Beaufort County shall be in writing and shall be delivered as provided under Article XVI
of the Development Agreement and shall be addressed as follows:
To Assignor: Pulte Home Company, LLC
c/o PulteGroup Inc.
Attn: Graham Hawkins
4401 Leeds Avenue, Suite 400
North Charleston, SC 29405
With A Required Copy To: Walter J. Nester, III
Burr & Forman LLP
23-B Shelter Cove Lane, Suite 400
Hilton Head Island, SC 29928
To Assignee: _____________________________
____________________________
_____________________________
_____________________________
With a required copy to: ______________________________
______________________________
______________________________
______________________________
4. Delivery. Assignor covenants and agrees to deliver a copy of this Partial Assignment to
Beaufort County and cause the original to be recorded on the land records.
148
Item 11.
55950342 v4
5. Binding Effect. This Partial Assignment shall inure to the benefit of and be binding upon the
respective parties hereto, their successors and assigns.
6. Governing Law. The within Partial Assumption shall be interpreted and constructed and
conform to the laws of the state of South Carolina.
[Reminder of page left intentionally blank.]
149
Item 11.
55950342 v4
IN WITNESS WHEREOF, the parties have caused this Partial Assignment to be duly executed as
of the ____ day of _______________, 20___.
WITNESSES: ASSIGNOR:
Pulte Home Company, LLC
a Michigan limited liability company authorized to
conduct business in South Carolina
_____________________________ ___________________________________
By:
Its:
_____________________________
STATE OF )
) ACKNOWLEDGMENT
COUNTY OF )
I, the undersigned Notary Public for _______________________, do hereby certify that
__________________________, as _____________________ of Pulte Home Company, LLC, personally
appeared before me this day and acknowledged the due execution of the foregoing instrument.
Witness my hand and official seal this _____ day of _______________, 20___.
Notary Public for __________________
My Commission Expires: ______________(Seal)
150
Item 11.
55950342 v4
WITNESSES: ASSIGNEE:
____________________________________________
_____________________________ ___________________________________
By:
Its:
_____________________________
STATE OF _____________________ )
) ACKNOWLEDGMENT
COUNTY OF )
I, the undersigned Notary Public for _______________________, do hereby certify that
__________________________, as _____________________ of _______________________________,
personally appeared before me this day and acknowledged the due execution of the foregoing instrument.
Witness my hand and official seal this _____ day of _______________, 20___.
Notary Public for __________________
My Commission Expires: _____________(Seal)
151
Item 11.
98 Jennings Road
Natural Resources
Committee
June 2, 2025
152
Item 11.
Comparison of Zoning Map Amendment Review Criteria
• In determining whether to adopt or deny a proposed Zone Map Amendment, the
Amendment, the County Council shall weigh the relevance of and consider whether
and consider whether and the extent to which the proposed development:
153
Item 11.
1. Consistency with the Comprehensive Plan
Staff Comments: No conflict identified.
Applicant Narrative: States compatibility with
the Development Code and adjacent zoning.
Comprehensive Plan Support:
The Plan calls for alignment between zoning
and the Comprehensive Plan (p. 137).
Encourages reevaluation of Place Type
Overlay tools to ensure effectiveness (p. 163,
BE 3.1).are expected to align their work plans
with the Plan’s goals (p. 137).
154
Item 11.
2. Conflict with Development Code or Ordinances
Staff Comments: No conflict identified.
Applicant Narrative: States compatibility with
the Development Code and adjacent
zoning.
Comprehensive Plan Support:
The Plan calls for alignment between zoning
and the Comprehensive Plan (p. 137).
Encourages reevaluation of Place Type
Overlay tools to ensure effectiveness (p.
163, BE 3.1).are expected to align their work
plans with the Plan’s goals (p. 137).
155
Item 11.
3. Demonstrated Community Need
Staff Comments: Notes workforce housing and local
rehabilitation contributions.
Applicant Narrative: Emphasizes entry-level housing
and economic diversity.
Comprehensive Plan Support:
Supports workforce housing and affordability
strategies (p. 154–155, H 1.1, H 2.1, H 3.1).
Recognizes the need for housing that supports
military families and young professionals (p. 147–
148, E 2.1, E 4.1).
Calls for “missing middle housing” to diversify
housing stock (p. 155, H 3.6).
156
Item 11.
4. Required by Changed Conditions
Staff Comments: No, not required by changed
conditions.
Applicant Narrative: Y es, conditions in the
market have changed due to outdated land
use and population growth.
Comprehensive Plan Support:
Encourages redevelopment and infill to meet
growth demands (p. 162, BE 1.1).
Acknowledges the need to adapt zoning to
meet evolving housing needs (p.154,H 2.1).
157
Item 11.
5. Compatibility with Surrounding Uses
Staff Comments: Compatible with nearby
residential and school uses.
Applicant Narrative: Aligns with adjacent
C3NMU zoning and land use.
Comprehensive Plan Support:
Supports transitions between rural and urban
areas through Place Types (p. 163, BE 3.2).
Encourages development that complements
existing neighborhoods (p. 136).
158
Item 11.
6. Adverse Effects on Nearby Lands
Staff Comments: Traffic impact noted; mitigation planned.
Applicant Narrative: No adverse effects due to environmental
compliance and buffers. Traffic Impact Analysis was
completed with very little impact
Traffic Impact Analysis: The Ramsey Farm development
introduces modest traffic increases that are well within the
capacity of the existing and planned infrastructure. With only
one minor geometric improvement and no major
signalization or widening required, the overall traffic impact
is minimal.
Comprehensive Plan Support:
Requires stormwater and environmental protections (p. 140–
141, NE 1.3, NE 3.3).
• Promotes traffic mitigation and complete streets (p. 150–
151, M 1.1, M 2.1).
159
Item 11.
7. Logical and Orderly Development Pattern
Staff Comments: Y es, higher
density placed near school and
roads.
Applicant Narrative: Supports
walkability and connectivity.
Comprehensive Plan Support:
Encourages walkable, connected
neighborhoods (p. 150–153, M
1.1, M 5.1).
Supports Place Type planning for
orderly growth (p. 163, BE 3.2).
160
Item 11.
8. Adverse Impacts on Natural Environment
Staff Comments: Must comply
with environmental standards.
Applicant Narrative: Includes civic
space and natural resource
protections.
Comprehensive Plan Support:
Emphasizes habitat
preservation, stormwater
management, and resilience (p.
140–143, NE 1.1, NE 3.3, NE
4.1).
161
Item 11.
9. Adequate Public Facilities
Staff Comments: Agencies notified; no
issues raised.
Applicant Narrative: Existing infrastructure
is sufficient.
Comprehensive Plan Support:
Supports infrastructure planning and
coordination (p. 156–157, CF 1.1, CF
3.1).
Aligns with Capital Improvement Plan
priorities (p. 169).
162
Item 11.
“The Comprehensive Plan acknowledges that growth is desired and
inevitable. . . Balance can be accomplished by guiding development to land
that is most suitable based on economic, cultural, social, and environmental
principles”
Recommendation:
We respectfully request your approval of this zoning map amendment so we may
move forward in partnership with the County to deliver a project that reflects the
values, priorities, and long-term vision of Beaufort County.
163
Item 11.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A MEMORANDUM OF
UNDERSTANDING WITH THE PORT ROYAL SOUND FOUNDATION FOR SURFACE ELEVATION TABLE STATION
COLLABORATION
MEETING NAME AND DATE:
Natural Resource Committee (June 2, 2025)
PRESENTER INFORMATION:
Stefanie M. Nagid, Land Preservation Director (5 minutes)
ITEM BACKGROUND:
This is a new item before County Council
PROJECT / ITEM NARRATIVE:
The Port Royal Sound Foundation (PRSF) has been named as a partner in informing and advancing priorities
identified and codified in Beaufort County’s Comprehensive Plan and Resilience Strategy. The County’s Public
Works, Planning and Zoning, and Land Preservation Departments have identified plans, strategies and
properties where the County and the PRSF have collaborative interests and efforts in promoting resiliency
data collection by installing and monitoring surface elevation table stations in the high marsh habitat. This
MOU formalizes the County and PRSF collaborative objectives but does not obligate funding for either party.
Any future requests involving specific action items or monetary contributions will be brought forward as
separate agreements for Council’s consideration.
FISCAL IMPACT:
There is no fiscal impact to the County with this MOU
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval
OPTIONS FOR COUNCIL MOTION:
Motion to approve, modify, or deny the County Administrator to enter into a Memorandum of Understanding
with the Port Royal Sound Foundation for surface elevation table station collaboration.
If approved by the Committee, move forward to County Council on June 23, 2025 for final approval.
164
Item 12.
RESOLUTION 2025/____
A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER
INTO A MEMORANDUM OF UNDERSTANDING WITH THE PORT ROYAL SOUND
FOUNDATION FOR SURFACE ELEVATION TABLE STATION COLLABORATION
WHEREAS, Beaufort County (County) and the P ort Royal Sound Foundation
(Foundation) have ongoing collaborative interests and efforts related to the Port Royal Sound and
its surrounding watershed; and
WHEREAS, the Foundation has been a named partner in informing and advancing
priorities identified and codified in Beaufort County’s Comprehensive Plan and Resilience
Strategy; and
WHEREAS, the County’s Public Works Department, Planning and Zoning Department
and Land Preservation Department have identified plans, strategies and properties where the
County and the Foundation collaborative interests and efforts may be implemented with the
installation and monitoring of surface elevation table stations; and
WHEREAS the County and Fou ndation have committed their int ention to continue to
work together to formalize these ongoing collaborative interests and efforts for the benefit of the
citizens of Beaufort County as further described in Exhibit A.
NOW, THEREFORE, BE IT RESOLVED by Beauf ort County Council , duly
assembled, does hereby authorize the County Administrator to enter into a Memorandum of
Understanding with the Port Royal Sound Foundation f or surface elevation table station
collaboration, as further described in Exhibit A.
Adopted this ______ day of ____________, 2025.
COUNTY COUNCIL OF BEAUFORT COUNTY
By: _______________________________
Alice Howard, Chairwoman
ATTEST:
_______________________________
Sarah Brock, Clerk to Council
165
Item 12.
Page 1 of 3
STATE OF SOUTH CAROLINA )
) MEMORANDUM OF UNDERSTANDING
COUNTY OF BEAUFORT ) SURFACE ELEVATION TABLE STATIONS
This Memorandum of Understanding (“MOU”) is entered into on this ____ day of
____________, 2025 (“Effective Date”) by and between Port Royal Sound Foundation ,
(“PRSF”) a South Carolina nonprofit corporation exempt from federal income tax under Section
501(c)(3) of the Internal Revenue Code, whose address is 310 Okatie H ighway, Okatie, SC
29909; and Beaufort County, (“County”) a political subdivision of the State of South Carolina ,
whose primary address is 100 Ribaut Rd Beaufort, SC 29901.
WHEREAS, the County and the PRSF (collectively known as the “Parties”) work together
and have ongoing collaborative interests and efforts between the parties related to the Port Royal
Sound and its surrounding watershed; and
WHEREAS, the P RSF has been a named partner in informing and advancing priorities
identified and codified in Beaufort County’s Comprehensive Plan and Resilience Strategy; and
WHEREAS, the County’s Public Works Department, Planning and Zoning Department
and Land Preservation Department have identified plans, strategies and properties where the
County and PRSF collaborative interests and efforts may be implemented; and
WHEREAS this MOU expresses the intention of the Parties to continue to work together
to formalize these ongoing collaborative interests and efforts as well as explore other partnerships
and opportunities in the future.
NOW, THEREFORE, the Parties will work together on collaborative interests and efforts and
agree to the Terms and Conditions as follows:
1. TERM. This MOU is valid upon the Effective Date and shall remain in effect until the 3 0th
day of June, 2030, unless terminated sooner pursuant to the provisions of this MOU.
2. COMPENSATION. This MOU does not oblig ate County or PRSF funds. Any request
involving reimbursement or contribution of funds between the Parties will require a
separate written agreement and will be handled in accordance with applicable laws,
regulations, and procedures. The County and PRSF wi ll incur all costs and liabilities of
their own employees.
3. TERMINATION. Either party shall have the right to terminate this MOU for any reason
upon thirty (30) days prior written notice delivered to the designated authority of the other
party. Any ongoing projects or commitments at the time of termination shall be addressed
in a separate written agreement between the parties.
166
Item 12.
Page 2 of 3
4. REPORTING AND CONTACTS. The designated authority for the Parties are identified as
follows:
County Contact: PRSF Contact:
Stefanie Nagid, Land Preservation
Director
Courtney Kimmel, Director of Conservation
124 Lady’s Island Drive 310 Okatie Hwy
Beaufort, SC 29907 Okatie, SC 29909
(843) 255-2152 (404) 405-0808
snagid@bcgov.net ckimmel@portroyalsoundfoundation.org
5. CONDITIONS. The Parties shall work in good faith to enter into specific objective -based
agreements, which shall be separately negotiated and executed, for the continued growth
and development of the following activities:
a. Support for installation, maintenance, and monitoring of Surface Elevation Tables in
high marsh areas adjacent to select County p roperties, namely, but not limited to,
Widgeon Point Preserve.
b. Support for PRSF-managed water quality monitoring program and data analysis that
will include and inform stormwater management efforts.
c. Support for expanding and accelerating living shoreline installations to stabilize
shorelines throughout the Port Royal Sound watershed, and salt marsh conservation
and resilience.
d. Expand resilience initiatives regionally through the Regional Resilience Working
Group.
e. Educate and inform visitors and residents on the unique ecological nature of the Port
Royal Sound through the continued operation of the PRSF Maritime Center and
community programming.
f. Encourage and facilitate science-based decision-making by having PRSF serve as an
independent scientific resource to provide relevant, credible science and data to inform
decisions made by Beaufort County leaders , with PRSF maintaining full editorial
independence in its scientific assessments and recommendations.
g. Pursue funding to support research and projects to advance our common goals and
priorities.
The above list should not be taken to exclude or replace other forms of cooperation
between the Parties on other issues of common interest.
6. OTHER PROVISIONS.
a. Mutual Cooperation. The Parties shall cooperate with each other and will use all
reasonable efforts to cause the fulfillment of the terms and conditions of this
MOU.
b. Entire Agreement. This MOU contains the entire agreement between the
Parties pertaining to the subject matter contained herein. The Parties do not
intend to create a legal partnership, principal/agent, or joint venture relationship.
167
Item 12.
Page 3 of 3
Nothing in this MOU shall be construed as creating such a relationship between
the Parties, and neither Party shall have the authority to bind the other Party to
any obligation. This MOU is non-exclusive and in no way restricts the County or
the PRSF from participating in similar activities or arrangements with other public
or private initiatives, organizations, or individuals.
c. Amendment or Modification. This MOU cannot be amended or modified orally
or by a single party. No amendment or modification to this MOU shall be valid
unless in writing and signed by both Parties to this MOU.
IN WITNESS WHEREOF, and in acknowledgement that the Parties hereto have read
and understood each provision hereof, the Parties have caused this MOU to be
executed on the Effective Date.
WITNESSES: BEAUFORT COUNTY
Michael Moore
County Administrator
WITNESSES: PORT ROYAL SOUND
FOUNDATION
Jody Hayward
Executive Director
168
Item 12.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
RESOLUTION TO APPROVE THE INSTALLATION OF STREET LIGHTS AT OYSTER FACTORY PARK
MEETING NAME AND DATE:
Natural Resources Committee – June 2, 2025
PRESENTER INFORMATION:
Stefanie M. Nagid, Land Preservation Director (10 minutes)
ITEM BACKGROUND:
Beaufort County acquired the Oyster Factory Park in 2003 through the Rural and Critical Lands Preservation
Program. A master plan and associated agreement between the County and the Town of Bluffton for
improvements, maintenance and management was executed in 2004, and amended in 2015, 2017, and 2022.
The agreement requires Council approval for any improvements made on the property.
PROJECT / ITEM NARRATIVE:
The Town of Bluffton is asking Council to approve the installation of six (6) street lights on Oyster Factory Park
along Bridge Street for security and safety of pedestrians and vehicles utilizing the park during non-daylight
hours.
FISCAL IMPACT:
None to the County
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval
OPTIONS FOR COUNCIL MOTION:
Motion to approve or deny the request to install six (6) street lights at Oyster Factory Park
169
Item 13.
RESOLUTION 2025/___
A RESOLUTION TO APPROVE THE INSTALLATION OF STREET LIGHTS
AT OYSTER FACTORY PARK
WHEREAS, Beaufort County (“County”) is sole owner of certain real property (R610 039 00A
0165 0000 and R610 039 00A 0190 0000) and co-owner of certain real property (R610 039 00A 0191 0000)
in Beaufort County, South Carolina known as Oyster Factory Park (“Property”) in the Town of Bluffton
under and by virtue of deeds recorded in the Beaufort County Register of Deeds at Deed Book 1693, Page
2006, and Deed Book 2587, Page 58, Beaufort County, South Carolina; and
WHEREAS, the Open Land Trust (“Trust”) holds a Conservation Easement on the Property, as
recorded in the Beaufort County Regis ter of Deeds at Book 1548, Page 626, Beaufort County, South
Carolina, which was amended in 2003 as recorded in the Beaufort County Register of Deeds at Book 1693,
Page 2002, Beaufort, South Carolina; and
WHEREAS, in 2004, the County and Town of Bluffton (“Town”) entered into an Agreement for
management, maintenance and improvements on the Property, which was amended in 2015 , in 2017, and
again in 2022 and included updates to the Oyster Factory Park Master Plan; and
WHEREAS, the Agreement between County and Town dated February 17, 2017, and amended in
2022, provides that the park shall be maintained as open space and that there shall be no improvements
constructed without the express, written consent of the County; and
WHEREAS, the County and Town staff have agreed to the installation of six (6) street lights on
the Property along Bridge Street.
NOW THEREFORE, BE IT RESOLVED, BY BEAUFORT C OUNTY COUNCIL , duly
assembled, does hereby approve the installation of six (6) street lights on Oyster Factory Park along Bridge
Street, as provided in Exhibit A attached and incorporated herein by reference.
Adopted this ____ day of ____________, 2025.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chairwoman
ATTEST:
Sarah Brock
Clerk to Council
170
Item 13.
R610 039 00A 0190 0000 R610 039 00A 0191 0000 R610 039 00A 0165 0000
- Streetlights
171
Item 13.
172
Item 13.
Natural Resources Committee
1st Term needs 6/11 Council Votes
2nd Term needs 8/11 Council Votes
3rd Ter m needs 10/11 Council Votes
Boards and Commissions Appointments and Reappointments
Zoning Board of Appeals
Evan Bromley Term to be served: 2nd Reappointment
173
Item 14.
174
Item 14.
Source: Beaufort County website. First collected Nov 8, 2026.