RecordWell Data

Natural Resources Committee — Agenda Packet

Beaufort County · Beaufort County · Natural Resources Committee · meeting of Jun 2, 2025 · Agenda packets

Open the original document More from Beaufort County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Natural Resources Committee Beaufort County, SC 2nd Floor Magistrates Courtroom, Arthur Horne Building, 104 Ribaut Road, Beaufort, SC 29901 Monday, June 02, 2025 3:00 PM *or at the conclusion of the Community Services Committee no sooner than 3:00PM* AGENDA COMMITTEE MEMBERS: YORK GLOVER, CHAIRMAN PAULA BROWN VICE-CHAIR GERALD DAWSON LAWRENCE MCELYNN ANNA MARIA TABERNIK ALICE HOWARD, EX OFFICIO 1. CALL TO ORDER 2. PLEDGE OF ALLEGIANCE 3. STATEMENT OF COMPLIANCE WITH FIOA 4. APPROVAL OF AGENDA 5. APPROVAL OF MINUTES- April 8, 2025 6. CITIZEN COMMENTS PERIOD – 15 MINUTES TOTAL 7. ASSISTANT COUNTY ADMINISTRATOR REPORT 8. 2024 ANNUAL REPORT PRESENTATION FROM FRIENDS OF FORT FREMONT 2024 ANNUAL REPORT - Barney Forsythe, President, Friends of Fort Fremont 9. APPROVAL TO FUND DUE DILIGENCE AND NEGOTIATE TERMS OF ACQUISITIONS FOR THE FOLLOWING PROPOSED GREEN SPACE PROGRAM APPLICATIONS (SEA ISLAND PARKWAY T RACTS, CHELSEA TRACTS) (FISCAL IMPACT: Sea Island Parkway Tracts- up to $30,000 due diligence, Chelsea Tracts- n/a. Green Space Program Fund Account #4706 -10-0000-54400) - Mike McShane, Chair of Green Space Advisory Committee & Mark Davis, Green Space Program Manager 10. AN ORDINANCE AMENDING THE ZONING MAP FOR 11 ACRES LOCATED ON BURNT CHURCH ROAD (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000) FROM T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) TO T3 NEIGHBORHOOD (T3N) - (FISCAL IMPACT: n/a) - Robert Merchant, AICP, Director, Beaufort County Planning and Zoning 11. AN ORDINANCE AMENDING THE ZONING MAP FOR 86.56 ACR ES LOCATED AT 98 JENNINGS ROAD (R100 028 000 0264 0000) FROM T2 RURAL (T2R) TO T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET 1 County Council Agenda – Beaufort County, SC CENTER (T4HC) UTILIZING THE HAMLET PLACE TYPE OVERLAY (PTO) (FISCAL IMPACT: n/a) - Robert Merchant, AICP, Director, Beaufort County Planning and Zoning 12. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A MEMORANDUM OF UNDERSTANDING WITH THE PORT ROYAL SOUND FOUNDATION FOR SURFACE ELEVATION TABLE STATION COLLABORATION. (FISCAL IMPACT: None) - Stefanie Nagid, Director, Land Preservation 13. A RESOLUTION TO APPROVE THE INSTALLATION OF STREET LIGHTS AT OYSTER FACTORY PARK. (FISCAL IMPACT: None to the County) - Stefanie Nagid, Director, Land Preservation 14. REAPPOINTMENT OF EVAN BROMLEY TO THE ZONING BOARD OF APPEALS FOR A THREE-YEAR TERM WITH THE EXPIRATION DATE OF MAY 2028. 15. ADJOURNMENT TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND BACKUP PACKAGES, PLEASE VISIT: https://beaufortcountysc.gov/council/council-committee-meetings/index.html 2 Natural Resources Committee Beaufort County, SC Council Chambers, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort Monday, April 07, 2025 4:00 PM MINUTES COMMITTEE MEMBERS: YORK GLOVER, CHAIRMAN PAULA BROWN VICE-CHAIR GERALD DAWSON LAWRENCE MCELYNN ANNA MARIA TABERNIK ALICE HOWARD, EX OFFICIO The video stream of this meeting is available on the County’s website: https://beaufortcountysc.new.swagit.com/videos/339270 1. CALL TO ORDER Committee Chairman Glover called the meeting to order at 4:00 pm. PRESENT Committee Chair York Glover Committee Vice-Chair Paula Brown Council Member Gerald Dawson Council Chair Alice Howard Council Member Lawrence McElynn Council Member Joseph Passiment Council Member Thomas Reitz Council Vice-Chair Anna Maria Tabernik ABSENT Council Member David Bartholomew Council Member Logan Cunningham Council Member Mark Lawson 2. PLEDGE OF ALLEGIANCE Committee Chairman Glover led the Pledge of Allegiance. 3 Item 5. Natural Resources Committee Minutes – Beaufort County, SC 3. PUBLIC NOTIFICATION OF THIS MEETING HAS BEEN PUBLISHED, POSTED, AND DISTRIBUTED IN COMPLIANCE WITH THE SOUTH CAROLINA FREEDOM OF INFORMATION ACT 4. APPROVAL OF AGENDA Motion: It was moved by Council Member Dawson, Seconded by Council Chair Howard, to approve the agenda. The Vote: The motion was approved without objection. 5. APPROVAL OF MINUTES - March 3, 2025 Motion: It was moved by Council Member Dawson, Seconded by Committee Vice -Chair Tabernik, to Approve the Minutes from March 3, 2025. The Vote: The motion was approved without objection. 6. PUBLIC COMMENT PERIOD – 15 MINUTES TOTAL Attorney Kevin Dukes- Pine Island Down Zoning Dr. McShane- Introducing Dr. Bridges with Nemoors, Wildlife Resource for County. 7. ASSISTANT COUNTY ADMINISTRATOR REPORT - Rob Merchant, Planning and Zoning Director Update and presentation by Rob Merchant on the Southern Lowcountry Regional Board (SoLo Co) Committees 8. Plastics Ordinance Update - Juliana Smith, Environmental Long Range Planner Update and presentation on the plastics ordinance by Rob Merchant, Planning and Zoning Director. AGENDA ITEMS 9. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE DOCUMENTS NECESSARY AND TO PROVIDE FUNDS TO CONTRIBUTE TO THE PROCUREMENT BY THE OPEN LAND TRUST FOR A CONSERVATION EASEMENT ON PROPERTY LOCATED IN UNINCORPORATED BEAUFORT COUNTY KNOWN AS TROTTER’S LOOP - PIN# R200 004 000 0285 0000, R200 004 000 059A 0000, R200 004 000 065B 0000, R200 004 000 065A 0000, R200 004 000 065C 0000, R200 004 000 065D 0000, R200 004 000 0065 0000, R200 004 000 066A 0000, R200 004 000 0066 0000, R200 004 000 0067 0000, R200 004 000 0057 0000, R200 004 000 057C 0000, R200 004 000 057D 0000, R200 004 000 073A 0000, R200 004 000 073C 0000, R200 004 000 071A 0000, R200 004 000 0058 0000, R200 003 000 0016 0000 (FISCAL IMPACT: ($310,000 from the Green Space Program Fund Account #4706 -10-0000-54400 Land Acquisition) - Mike McShane, Greenspace Committee Chair The Open Land Trust submitted a Green Space Program Conservation Easement application on behalf of the landowners for consideration. On June 10, 2024, the Community Services and Land Use Committee approved due diligence and negotiations of the application. On March 7, 2025. the Green Space Advisory Committee (GSAC) met, reviewed existing due diligence provided by the applicant, and voted to 4 Item 5. Natural Resources Committee Minutes – Beaufort County, SC recommend approval for the contribution of funds not to exceed the requested amount of $310,000.00. The GSAC vote was unanimous. Trotter's Loop is privately owned 55 +/ - acre property located in unincorporated Beaufort County on Pleasant Point Drive and Trotter's Loop. The Open Land Trust (applicant) is working with the property owners to place a conservation easement over the entire property, which is currently comprised of (18) individual parcels that would be consolidated into three (3) parcels. The conservation easement would allow for a maximum of five (5) total par cels. The appraised value for the conservation easement is approximately $775,000.00. The application requests 40% funding ($310,000.00) from the Green Space Program and the landowners donating 60% of the easement value ($465,00.00). The conservation easement will be held and managed by the Open Land Trust and will protect this property in perpetuity. A preservation outcome for this property would achieve several goals of the Green Space Program, including: preservation of intact natural habitats for plants and animals; protection of water quality; and preservation of scenic corridors along rural county and state roadways. GSAC recommends approval to fund the application, not to exceed the requested amount of $310,000.00. Motion: It was moved by Council Mem ber Brown, Seconded by Council Vice -Chair Tabernik, to Approve A Resolution Authorizing the County Administrator to Execute the Documents Necessary and to Provide Funds to Contribute to the Procurement by the Open Land Trust for a Conservation Easement on Property Located in Unincorporated Beaufort County Known as Trotter's Loop - PIN# R200 004 000 0285 0000, R200 004 000 059A 0000, R200 004 000 065B 0000, R200 004 000 065A 0000, R200 004 000 065C 0000, R200 004 000 065D 0000, R200 004 000 065 0000, R200 00 4 000 066A 0000, R200 004 000 0066 0000, R200 004 000 0067 0000, R200 004 000 0057 0000, R200 004 000 057C 0000, R200 004 000 057D 0000, R200 004 000 073A 0000, R200 004 000 073C 0000, R200 004 000 071A 0000, R200 004 000 0058 0000, R200 003 000 0016 0000 The Vote: The motion was approved without objection. 10. A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE DOCUMENTS NECESSARY AND TO PROVIDE FUNDS TO CONTRIBUTE TO THE PROCUREMENT BY BEAUFORT COUNTY FOR FEE SIMPLE REAL PROPERTY LOCATED IN UNINCORPORATED BEAUFORT COUNTY KNOWN AS THE NORTH WIDGEON TRACTS (PIN# R600 007 000 001A 0000, R600 007 000 0011 0000, R600 007 000 0010 0000, R600 007 000 0009 0000, R600 007 000 0008 0000, R600 007 000 0007 0000, R600 007 000 0006 0000, R600 007 000 0005 0000) (FISCAL IMPACT: $250,000 from the Green Space Program Fund Account #4706-10-0000-54400 - Land Acquisition) - Mike McShane, Greenspace Committee Chair This Rural and Critical Lands Preservation Program project was also submitted to the Green Space Program to support their work and purchase of properties. The North Widgeon Tracts comprise 9.55 +/- acres in unincorporated Beaufort County along Highway 170, the Broad River. They are adjacent to a Beaufort County -owned and operated Passive Park, Widgeon Point. The Open Land Trust (applicant) applied to the Green Space Program to partner with the final project of the Rural and Critical Lands Preservation Program. A preservation outcome for this property would achieve many goals of the Green Space Program, including preservation of an intact natural habitat for plants and animals, protection of water quality, preservation of an established maritime forest, improved environmental resilience, protection of viewsheds along Highway 170, the Port Royal Sound, the Broad River, Wigeon Point, and expansion of an abutting Beaufort County owned and operated Passive Park, offering public access. Motion: It was moved by Council Vice-Chair Tabernik, Seconded by Council Member McElynn to Approve a Resolution Authorizing the County Administrator to Execute the Documents Necessary and to Provide 5 Item 5. Natural Resources Committee Minutes – Beaufort County, SC Funds to Contribute to the Procurement by Beaufort County for Fee Simple Real Property Located in Unincorporated Beaufort County Known as the North Widgeon Tracts PIN# R600 007 000 001A 0000, R600 007 000 0011 0000, R600 007 000 0010 0000, R600 007 000 0009 0000, R600 007 000 0008 0000, R600 007 000 0007 0000, R600 007 000 0006 0000, R600 007 000 0005 0000. The Vote: The motion was approved without objection. 11. AN ORDINANCE AUTH ORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF TAX MAP SERIAL NUMBERS TMS R600 007 000 001A 0000, R600 007 000 0005 0000, R600 007 000 0006 0000, R600 007 000 0007 0000, R600 007 000 0008 0000, R600 007 000 0009 0000, R600 007 000 0010 0000, AND R600 007 000 0011 0000, ALSO KNOWN AS NORTH WIDGEON FEE (Fiscal Impact: $2,200,000 plus closing costs from Beaufort County Rural and Critical Land Preservation Program Bond Referendum Account # 4500-80-0000-54400) - Amanda Flake The Rural and Critical Land Preservation Board recommended pursuing due diligence on 10/7/2024, and the Community Service and Land Use Committee voted to approve due diligence on 10/14/24. Partner funds were applied for and sought for the Green Space Program and SC Conservation Bank. With staff recommendations, the RCLP Board recommended purchasing, utilizing $2,200,000.00 of RCLP Bond funds, on January 13, 2025. The county land preservation department prioritizes North Widgeon Fee due to its physical and visual proximity to Widgeon Point Preserve. The property consists of +/- 9.55 high acres along the banks of the Broad River and has access from Highway 170 at the base of the Broad River Bridge. The landowners applied to the Rural a nd Critical Lands Program in September 2024, and the RCLP Board unanimously supported the project. The total purchase price of $2,700,000.00 represents a bargain sale by the landowners, $2,200,000.00 is recommended from the RCLP Bond funds (Fund 4500), $25 0,000.00 was sought and recommended by the Green Space Advisory Board (a concurrent resolution references these funds) and $250,000.00 was applied for and approved by the SC Conservation Bank on March 19, 2025. This funding partnership mirrors the requirem ent to acquire Widgeon Point Preserve nearby, and it will utilize the majority of the remaining funds from the Rural and Critical Lands Program to expand this crucial public access. Staff supports this recommendation. Motion: It was moved by Council Member Passiment, Seconded by Council Member Dawson to Approve an Ordinance Authorizing the County Administrator to Execute the Necessary Documents and Provide Funding for the Purchase of Tax Map Serial Numbers TMS R600 007 000 001A 0000, R600 007 000 0005 0000, R600 007 000 0006 0000, R600 007 000 0007 0000, R600 007 000 0008 0000, R600 007 000 0009 000, R600 007 000 0010 0000 AND R600 007 000 0011 0000, also Known as North Widgeon Fee. The Vote: The motion was approved without objection. 12. ADJOURNMENT 4:53 PM TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND BACKUP PACKAGES, PLEASE VISIT: https://beaufortcountysc.gov/council/council-committee-meetings/index.html Ratified: 6 Item 5. 7 Item 6. #3 REQUEST FOR PUBLIC COMMENTS Beaufort County, SC Council Date: -------- Name: Print:_/)_. I'_. _/k_L_f�;()_�j��----'-/},...J ________ _ Signature: _______________________ Home Address: --------------------- Em ail Address: --------------------- Phone Number: District: ----------- -------- Topic: _______________________ _ -#4 REQUEST FOR PUBLIC COMMENTS­ Beaufort County, SC Council Date: -------- Name: Print: _____________________ _ Signature: _______________________ Home Address: --------------------- Em ail Address: ____________________ _ Phone Number: ___________ District: ______ _ Topic: _______________________ _ 8 Item 6. Pocotaligo Preserve Management Plan Stefanie M. Nagid, Director Land Preservation Department June 2, 2025 9 Item 7. Property Description • 527 acres acquired on October 20, 2023 for $5,449,000 • Acquisition purposes include: • Protection of natural resources • Connectivity and ecological contribution to the ACE Basin • Future public access for passive recreation • Bound by Hwy 17 (W), Cotton Hall Road (N), 10 Item 7. Natural Resources Current Conditions • Fallow fields (~180 acres) • 10 stands • Previously farmed, currently recovering with native grasses, forbs and trees • Forested mesic uplands (~97 acres) • 2 stands (8, 14) • Currently intact on northern section • Forested wetlands (~110 acres) • 2 stands (6, 7) • Previously clearcut on southern section, currently recovering with early successional species • Impoundments (~140 acres) • 4 stands • Previously semi-managed, currently open flow and needs improvements 11 Item 7. 12 Item 7. Habitat Management and Restoration • Maintain and enhance the existing forested mesic uplands and forested wetlands • Targeted removal of invasive exotic vegetation (Chinese Tallow) • Allow nature to evolve and recover through natural processes • Possible supplemental hardwood tree plantings if needed 13 Item 7. Habitat Management and Restoration • Restore and enhance the existing fallow fields to longleaf/grassland and grassland savannahs • Prescribed burning to promote native grasses and forbs • Longleaf pine restoration in appropriate areas • Maintain open grasslands in appropriate areas 14 Item 7. Habitat Management and Restoration • Enhance the existing impoundments • Repair water control structures and infrastructure to improve connectivity and flow • Enhance habitat for fish and avian fauna 15 Item 7. Infrastructure Improvements 1) Replacement of culverts, flap gates and risers 2) Repair and stabilize existing dikes 3) Excavate circulation canals 16 Item 7. Public Access Planning and Development • Immediate need for water control structure repairs for access and safety • Army Corps permit to implement recommended improvements was submitted in October 2024; anticipate response in June/July 2025 • Public access planning and permitting can begin after initial repairs are completed • Once begun, may take 2-4 years to complete plans and all necessary permits • Access improvements likely to occur in stages over 5-7 years until complete • Management and restoration will not end • Prescribed burning will be ongoing every 2-3 years, in perpetuity • Impoundment and canal excavation likely to occur in 17 Item 7. Cost Estimates* • Water Control Structure Repairs: $150,000 – FY26 budget request • Berm Stabilization/Canal Excavation: $750,000 - $1,000,000 • Prescribed Burning: $8,000 per event • Longleaf Pine Reforestation: $20,000 • Invasive Exotic Vegetation Control: $5,000 per event • Public Access Planning: $350,000 • Public Access Improvements: $7M-$10M *Pre-tariff estimates and dependent upon funding, material and labor availability 18 Item 7. Timeline* • FY25 Complete Management Plan Complete initial prescribed burn • Obtain ACoE permit – submitted • FY26 • Complete initial water control structure repairs • Begin routine land management actions (reforestation, prescribed burning, exotic control, monitoring) • FY27 • Begin canal/berm improvements • FY28 • Complete canal/berm improvements • Complete conceptual public access planning • Begin civil planning and permitting • FY29 • Complete civil planning and permitting • Begin Phase I public access construction • FY30 • Complete Phase I public access construction *Dependent upon funding and permitting approvals 19 Item 7. 20 Item 7. BEAUFORT COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: PRESENTATION OF FRIENDS OF FORT FREMONT 2024 ANNUAL REPORT MEETING NAME AND DATE: Natural Resources Committee – June 2, 2025 PRESENTER INFORMATION: Barney Forsythe, President, Friends of Fort Fremont (10 minutes) ITEM BACKGROUND: This is a presentation only PROJECT / ITEM NARRATIVE: The Friends of Fort Fremont have been operating the Fort Fremont History Center since November 2021. The Friends of Fort Fremont welcomed over 6,000 visitors from 46 states and 13 foreign countries at the History Center. Volunteers worked a total of 1,862 hours at the history center and 374 hours on grounds clean up. Other activities included various educational and community outreach events, increased promotion on social and print media, and enhancing the preserve with various artifacts and replicas of historic items. FISCAL IMPACT: N/A STAFF RECOMMENDATIONS TO COUNCIL: Presentation Only OPTIONS FOR COUNCIL MOTION: Presentation Only 21 Item 8. Annual Report for 2024 to Beaufort County Land Use Committee Friends of Fort Fremont June 2, 2025 Barney Forsythe, President 22 Item 8. Mission of the Friends of Fort Fremont To preserve and promote Fort Fremont as an educational, historical, natural, and cultural resource of the Spanish-American War era on the shores of historic Port Royal Sound in Beaufort, South Carolina 23 Item 8. Community Partnership 24 Item 8. Overview History Center Operations Facilities and Grounds Enhancing the Visitor Experience Educational Outreach Community Outreach Social Media Marketing 25 Item 8. History Center Operations • Staffed Center on Fridays, Saturdays, and Sundays • Extended hours in 2025— Thursday 1:00-4:00 • Total of 1,862 volunteer hours • Over 6,000 visitors (-20%)* • 46 states • 13 foreign countries * Center closed for almost 2 months during peak times due to weather-related issues that impacted the electrical systems at the history center 26 Item 8. Facilities and Grounds • 374 volunteer hours + 28 AFJROTC cadet volunteers • General Cleanup • Vegetation removal • Clean up inside the batteries 27 Item 8. Educational Outreach • Goal: get children excited about history, Beaufort County heritage, and Fort Fremont • Linked to grades 5 and 8 social studies curriculum • 2 school groups • School-age activities during Harvest Festival • Traveling Trunk 28 Item 8. Community Outreach 29 Item 8. Social Media • Over 2,000 followers • #5 of 18 on St Helena Island www.fortfremont.org 30 Item 8. Marketing • Post and Courier101 Things to do in SC • Newsletter 1000 copies • SC Welcome Expo (postponed until early 2025) • ATAX grant for $12,000 for use in 2025 THANK YOU! • Rack Cards +5900 • SC Welcome Centers • Arsenal • Hunting Island • Local hotels and BNBs 31 Item 8. Enhancing the Visitor Experience • Artifacts and Replicas ✓Delivery Table ✓Davit ✓Projectile • Ammo Cart • “Carl Project” • Gun Position #1 Recreation • Engineering Study Complete • Digital Simulation with West Point History Dept Site visit early August • Book Project: Draft in early June 32 Item 8. Special Thanks for a Strong Partnership! Stephanie Nagid Land Preservation Department Director 33 Item 8. Y’ ALL Come! www.fortfremont.org 34 Item 8. BEAUFORT COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: RECOMMEND APPROVAL TO FUND DUE DILIGENCE AND NEGOTIATE TERMS OF ACQUISITIONS FOR THE FOLLOWING PROPOSED GREEN SPACE PROGRAM APPLICATIONS (SEA ISLAND PARKWAY TRACTS, CHELSEA TRACTS) MEETING NAME AND DATE: Natural Resources Committee, June 2, 2025 PRESENTER INFORMATION: Mr. Mike McShane, Chair of Green Space Advisory Committee & Mr. Mark Davis, Green Space Program Manager (20 minutes) ITEM BACKGROUND: During their May 16, 2025 meeting, the Green Space Advisory Committee (GSAC) reviewed two new applications. The recommendations from the (GSAC) are as follows: PROJECT / ITEM NARRATIVE: (1) FEE SIMPLE APPLICATION: SEA ISLAND PARKWAY TRACTS, BEAUFORT; POLITICAL JURISDICTION – UNINCORPORATED BEAUFORT COUNTY; GEOGRAPHIC REGION – EASTERN (PURSUE DUE DILIGENCE) (2) CONSERVATION EASEMENT APPLICATION: CHELSEA TRACTS, OKATIE; POLITICAL JURISDICTION - UNINCORPORATED JASPER COUNTY; GEOGRAPHIC REGION – OUTSIDE OF COUNTY (PURSUE DUE DILIGENCE) FISCAL IMPACT: Green Space Program Fund Account #4706-10-0000-54400: 1. For Sea Island Parkway Tracts - Up to $30,000 due diligence 2. For Chelsea Tracts – N/A OPTIONS FOR COUNCIL MOTION: Motion to approve, modify, or deny the recommendations of the Green Space Advisory Committee. 35 Item 9. 36 Item 9. 37 Item 9. 38 Item 9. 39 Item 9. BEAUFORT COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 11 ACRES LOCATED ON BURNT CHURCH ROAD (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000) FROM T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) TO T3 NEIGHBORHOOD (T3N) MEETING NAME AND DATE: Natural Resources Committee Meeting, May 5 , 2025 PRESENTER INFORMATION: Robert Merchant, AICP, Director, Beaufort County Planning and Zoning (10 minutes needed for item discussion) ITEM BACKGROUND: This rezoning application went before the Beaufort County Planning Commission at their April 7, 2025, meeting. At that time, the Commission voted 5-2 to recommend approval of the proposed amendment to County Council. PROJECT / ITEM NARRATIVE: The applicant is seeking to amend the zoning of three parcels that make up 11 acres. They are currently zoned T3 Hamlet Neighborhood and T4 Hamlet Center, and the applicant is requesting a zoning amendment to T3 Neighborhood in order to accommodate 50 single-family homes. The current use is a non-conforming mobile home park. FISCAL IMPACT: Not applicable STAFF RECOMMENDATIONS TO COUNCIL: Staff recommends approval. The property is split zoned along current property lines. The current zoning does not allow for consistent development across the properties. OPTIONS FOR COUNCIL MOTION: Motion to approve, modify, or deny the application as submitted;* Approval of the application with a reduction in the area proposed to be rezoned;* Approval of a rezoning to a more restricted base zone than requested in the application;* or Denial of the application.* *Council’s decision must be based on the standards in Section 7.3.40 C of the Community Development Code (Attachment A to this AIS) and must clearly state the factors considered in making its decision and the basis or rationale for the decision. (7.4.90 B.3). These factors are as follows: 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of this Development Code. In areas of new development, a finding of consistency with the Comprehensive Plan shall be considered to meet the standards below, unless compelling evidence demonstrates the proposed amendment would threaten the public health, safety, and welfare if the land subject to the amendment is classified to be consistent with the Comprehensive Plan; 40 Item 10. 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances; 3. Addresses a demonstrated community need; 4. Is required by changed conditions; 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land; 6. Would not adversely impact nearby lands; 7. Would result in a logical and orderly development pattern; 8. Would not result in adverse impacts on the natural environment—including, but not limited to, water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the environment; and 9. Would result in development that is adequately served by public facilities (e.g., streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities). Attachment A. CDC Section 7.3.40 B.7 Zoning Map Amendment (Rezoning) provides: The County Council’s decision shall be based on the standards in Subsection 7.4.30 C and shall be one of the following: 1. Approval of the application as submitted; 2. Approval of the application with a reduction in the area proposed to be rezoned; 3. Approval of a rezoning to a more restricted base zone than requested in the application; 4. Denial of the application. CDC Section 7.3.40 C. Zone Map Amendment Review Standards. The advisability of an amendment to the Official Zoning Map is a matter committed to the legislative discretion of the County Council and is not controlled by any one factor. In determining whether to adopt or deny a proposed Zone Map Amendment, the County Council shall weigh the relevance of and consider whether and the extent to which the proposed amendment: 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of this Development Code. In areas of new development, a finding of consistency with the Comprehensive Plan shall be considered to meet the standards below, unless compelling evidence demonstrates the proposed amendment would threaten the public health, safety, and welfare if the land subject to the amendment is classified to be consistent with the Comprehensive Plan; 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances; 3. Addresses a demonstrated community need; 4. Is required by changed conditions; 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land; 6. Would not adversely impact nearby lands; 7. Would result in a logical and orderly development pattern; 41 Item 10. 8. Would not result in adverse impacts on the natural environment —including, but not limited to, water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the environment; and 9. Would result in development that is adequately served by public facilities (e.g., streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities). CDC Section 7.4.90 B.3 provides: County Council’s decision shall clearly state the factors considered in making the decision and the basis or rationale for the decision. 42 Item 10. ORDINANCE 2025/________ AN ORDINANCE AMENDING THE ZONING MAP FOR 11 ACRES LOCATED ON BURNT CHURCH ROAD (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000) FROM T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) TO T3 NEIGHBORHOOD (T3N) WHEREAS, the properties located at 1 Devonwood Dr, 3 Devonwood Ct, and 171 Burnt Church Road (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000) are currently zoned T3 Hamlet Neighborhood and T4 Hamlet Center; and WHEREAS, the owners of the properties have requested to change the zoning of the properties to T3 Neighborhood to accommodate 50 single-family homes; and WHEREAS, the Beaufort County Comprehensive Plan Future Land Use designation is Urban Use and calls for development that is compatible with the type and mix of land currently found in the municipalities; and WHEREAS, T3 Neighborhood achieves this as its primary intent is to reinforce established neighborhoods and to maintain neighborhood stability in walkable urban areas; and WHEREAS, the Beaufort County Planning Commission considered the request on April 7, 2025, voting 5-2 to recommend that County Council approve the request; and WHEREAS, County Council now wishes to amend the zoning map to change the zoning of the properties from T3 Hamlet Neighborhood and T4 Hamlet Center to T3 Neighborhood. NOW, THEREFORE be it ordained by County Council in a meeting duly assembled as follows: To adopt an ordinance amending the zoning map for 11 acres (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000) located at 1 Devonwood Dr, 3 Devonwood Ct, and 171 Burnt Church Road from T3 Hamlet Neighborhood and T4 Hamlet Center to T3 Neighborhood. Ordained this ___ day of ______________, 2025 _________________________ Alice Howard, Chair 43 Item 10. ___________________________ Sarah Brock, Clerk to Council 44 Item 10. 45 Item 10. CDPA-000047-2025– Devonwood Rezoning Page 1 of 4 TO: York Glover, Chair, Natural Resources Committee of County Council FROM: Robert Merchant, AICP, Beaufort County Planning and Zoning Department DATE: April 11, 2025 SUBJECT: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 11 ACRES LOCATED ON BURNT CHURCH ROAD (R600 039 000 1552 0000, R600 039 000 0056 0000, R600 039 000 0269 0000) FROM T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) TO T3 NEIGHBORHOOD (T3N) STAFF REPORT: A. BACKGROUND: Case No. CDPA-000047-2025 Owner: One Devonwood LLC, Joni Strickland, Lawrence Graves Jr Applicant: Andrew Klosterman Property Location: 1 Devonwood Dr, 3 Devonwood Dr, 171 Burnt Church Rd District/Map/Parcel: R600 039 000 1552 0000, R600 039 000 0269 0000, R600 039 000 0056 0000 Property Size: 11 acres Current Future Land Use Urban Mixed Use Designation: Current Zoning District: T3 Hamlet Neighborhood and T4 Hamlet Center Proposed Zoning District: T3 Neighborhood B. SUMMARY OF REQUEST: The applicant is proposing a rezoning of three parcels from T3HN and T4HC to T3N to yield 50 single-family homes. The parcels currently contain a non- conforming mobile home park. MEMORANDUM 46 Item 10. CDPA-000047-2025– Devonwood Rezoning Page 2 of 4 C. EXISTING ZONING: Currently two of the parcels are comprised of T3HN which is intended to reinforce established neighborhoods, to maintain neighborhood stability and provide a transition between the walkable neighborhood and rural areas. Also, two of the parcels are comprised of T4HC which is intended to integrate appropriate, medium-density residential building types, such as duplexes, townhouses, small courtyard housing, and mansion apartments in an environment conducive to walking and bicycling. D. PROPOSED ZONING: The proposed zoning of T3N is intended to provide a walkable, predominantly single-family neighborhood that integrates compatible multi-family housing types, such as duplexes and cottage courts within walking distance to transit and commercial areas. E. TRAFFIC IMPACT ANALYSIS (TIA): According to Section 6.3.20.D of the CDC, “An application for a rezoning shall include a TIA where the particular project or zoning district may result in a development that generates 50 trips during the peak hour or will change the level of service of the affected street.” The application does not require a TIA. F. ZONING MAP AMENDMENT REVIEW STANDARDS: In determining whether to adopt or deny a proposed Zone Map Amendment, the County Council shall weigh the relevance of and consider whether and the extent to which the proposed amendment: 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of this Development Code; Yes, it is consistent with the Comprehensive Plan. The future land use designation of Urban Mixed Use calls for development that is compatible with the type and mix of land currently found in the municipalities. This can be achieved through T3N as the district’s primary intent is to reinforce established neighborhoods and to maintain neighborhood stability in walkable urban areas per the CDC. 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances; Yes, it is not in conflict with the CDC. 3. Addresses a demonstrated community need; No, it does not. 4. Is required by changed conditions; No, it is not. 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land; Yes, this rezoning is compatible with the surrounding area. This proposed zoning district allows for primarily Single-Family homes with lower density Multi-family units. The 47 Item 10. CDPA-000047-2025– Devonwood Rezoning Page 3 of 4 downzoning of the T4HC portion to T3N now limits the use of commercial along Burnt Church Road and allows this area to be more residential as it transitions toward the May River and Allyjoy Community. 6. Would not adversely affect nearby lands; Yes, this would not adversely affect nearby lands as this rezoning will constitute in a similar intensity of the existing development. The applicant is proposing 50 single-family homes. Currently there is a mobile home park consisting of about 50 homes. 7. Would result in a logical and orderly development pattern; Yes, see 5. 8. Would not result in adverse impacts on the natural environment – including, but not limited to, water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the environment: Any development on the site would be required to adhere to the natural resource protection, tree protection, wetland protection, and stormwater standards in the Community Development Code and the Stormwater BMP Manual. 9. Would result in development that is adequately served by public facilities (e.g.. streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities: The school district and BJWSA have been notified. BJWSA stated that water and sewer is available and the developer is aware of connections and capacity requirements. G. STAFF RECOMMENDATION: Staff recommends approval. The property is split zoned along current property lines. The current zoning does not allow for consistent development across the properties. This rezoning is an upzoning for 6 acres and a downzoning for 5 acres. H. PLANNING COMMISSION RECOMMENDATION: At their April 7, 2025 meeting, the Planning Commission voted 5-2 recommending approval of the rezoning. I. ATTACHMENTS • Zoning Map (existing and proposed) • Application 48 Item 10. 49 Item 10. 2712 Bull Street, Suite A • Beaufort, SC 29902 O: (843) 379-2222 F: (843) 379-2223 W W W . D A V I S F L O Y D . C O M February 17, 2025 Mr. Rob Merchant, AICP Beaufort County Planning and Zoning Director PO Drawer 1228 Beaufort, South Carolina 29902 Re: Property Rezoning for Parcels R600-039-000-0056, 0269, and 1552 171 Burnt Church Road – Proposed 50 Lot Residential Subdivision D|F Job Number: 32210.00 To whom it may concern, Our client, Mr. Jimmy Yirka, is proposing to develop a new 50-lot residential subdivision in downtown Bluffton located at 171 Burnt Church Road. The land is comprised of three parcels zoned T4HNC and T3HN which currently contain a non-conforming mobile home park in disarray. The three parcels have varied minimum lot and setback dimensions. To achieve a 50’ x 100’ minimum lot size and Village House building type, we are requesting to rezone all three parcels to T3N. The front two parcels totaling nearly 6 acres will be downzoned while the rear 5-acre parcel will be upzoned. We believe this rezone would result in a net reduction of the overall density of the development that would be allowed by-right, but is necessary to achieve a more consistent look across the development and would eliminate the complexity of designing a subdivision on a dually zoned property. T4HC allows a 50’ minimum lot size with a 10’ front and 5’ side setback. T3HN allows a 65’ minimum lot width with a 25’ front and 10’ side setback. We believe rezoning all parcels to T3N which allows for a 50’ minimum lot width with 15’ front and 7.5’ side yard setbacks are an appropriate balance that would not disrupt the character of the surrounding communities and fits with the intent of the zoning map and ordinance. Included in this submittal are the Community Development Code (CDC) Zoning Map Amendment Applications, and below are the responses to the questions listed on page 3 of the application. Beaufort County Zoning Questions are shown in Black. Davis & Floyd Responses are in Blue. 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of this Development Code. In areas of new development, a finding of consistency with the Comprehensive Plan shall be considered to meet the standards below, unless compelling evidence demonstrates the proposed amendment would threaten the public health, safety, and welfare if the land subject to the amendment is classified to be consistent with the Comprehensive Plan: - The goal of this rezoning is to apply a single zoning across 3 combined parcels. The current parcels are classified as a mix of T4HC and T3HN. We are proposing a rezoning of the entire 50 Item 10. 171 Burnt Church Road Page 2 parcel to T3N which is a fair balance of the two current zones. The proposed site will be in compliance with the new T3N zoning. 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances: - There are no known conflicts with the Development Code or Code of Ordinances for rezoning of this property. 3. Addresses a demonstrated community need: - The goal of this project is to provide 50 single-family village houses in the heart of downtown Bluffton. The houses are anticipated to serve middle income residents which we believe is needed in the area. These houses will replace an existing non-conforming mobile home park which we feel will be welcomed by the community. 4. Is required by changed conditions: - The rezoning is required for this property to create a uniform code across the entire development due to the current dual zoning standards. 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land: - The current property is zoned for residential use and will be developed as a residential neighborhood. There are several similar and larger sized residential communities in the immediate area and we believe this project will be beneficial to all surrounding properties. 6. Would not adversely impact nearby lands: - There are no adverse impacts to the nearby lands on this project. We feel removing the existing mobile home park, which appears to be on septic, and replacing it with a new residential community on public sewer is beneficial to all nearby lands. 7. Would result in a logical and orderly development pattern: - The proposed site plan included in this submittal shows the layout based on the requested T3N rezoning. As shown, having a uniform zoning across the site will result in a more consistent development pattern and prevent a more scattered, mixed bag of development standards. 8. Would not result in adverse impacts on the natural environment—including, but not limited to, water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the environment: - There are no adverse impacts to the natural environment proposed on the site. The site will utilize a stormwater pond and infiltration BMPs to comply with the SoLoCo manual and DES- OCRM standards. As mentioned above, the existing site is somewhat in disarray, and we believe are currently on septic tanks and drainfields which will all be removed. The new development will be placed on BJWSA sewer by means of a new pump station and force main. 51 Item 10. 171 Burnt Church Road Page 3 9. Would result in development that is adequately served by public facilities (e.g., streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities): - The project is in the heart of downtown Bluffton where all the above-mentioned services are readily available. The project would not have an adverse impact or create a burden on any of these facilities. If you have any questions, or need anything else for your review, please contact me at (843) 379-2222 or at aklosterman@davisfloyd.com. Yours truly, Andrew Klosterman PE Senior Project Manager 52 Item 10. 4 8 7 CIVIC SPACE6 2 3 1 23 22 21 20 19 18 91011121314 27 24 31 28 25 30 32 33 34 35 CIVIC SPACE51 53 49 52 48 47 4546 40 3836 3937 44 42 43 4150 FL 20' BUFFER 10' BUFFER (WITH SOLID FENCE) 10' BUFFER 10' BUFFER POND OPEN SPACE 100.0 52.5 100.0 52.5 52.5 100.0 52.5 52.5 100.0 52.5 52.5 100.0 52.553.1 100.0 54.7 100.0 53.1 53.1 100.0 53.1 53.1100.0 53.1 55.5 100.0 100.0 50.0 100.0 50.0 50.012.2 100.0 10.150.0 100.0 49.6 100.0 48.9 17.032.6 100.0 32.816.1 50.0 100.0 50.0 51.34.5 100.1 8.0 51.3 61.8 100.0 59.3 100.0 50.0 100.0 50.0 100.0 62.914.9 15.861.4 100.0 50.0 50.0 100.0 29.220.8 22.527.5 100.0 50.0 50.0 37.8 39.9 100.0 57.5 100.0 55.4 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 50.018.840.3 100.0 38.718.8 100.0 50.0 100.0 50.950.0 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 50.0 50.0 71.9 100.0 69.8 50.0 100.0 50.0 50.0 100.0 50.0 13 33 11 2 8 332 8 2 3 ROAD A ROAD B ROAD B ROAD CROAD C ROAD DROAD D ROAD E ROAD EROAD E ALLEY ALLEY ALLEY ALLEY ALLEYALLEY ALLEY ALLEY ALLEY ALLEY ALLEY 50.0 100.0 50.0 61.7 38.3 100.0 50.0 50.0 100.0 50.0 100.0 50.0 50.0 64.735.3 50.0 100.0 52.2 100.0 50.0 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 70.0 100.040.0 40.0 40.0 50.0 100.0 50.015.0 50.0 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 50.0 100.0 50.0 53.7 100.0 52.2 CIVIC SPACE1617 5 6 9 5 29 26 ALLEY 15' FRONTSETBACK (TYP.)15' FRONTSETBACK (TYP.) 15' FRONTSETBACK (TYP.) 15' FRONTSETBACK (TYP.) 15' FRONTSETBACK (TYP.) 15' FRONTSETBACK (TYP.) 15' FRONTSETBACK (TYP.) 15' FRONTSETBACK (TYP.) 15' FRONTSETBACK (TYP.) 15' FRONTSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.) 10' SIDE STREETSETBACK (TYP.)10' SIDE STREETSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 5' REARSETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.) 7.5' SIDE SETBACK (TYP.)15 OWNER THESE DRAWINGS AND THE DESIGN THEREON ARE THE PROPERTY OF DAVIS & FLOYD, INC. AND MAY NOT BE USED IN WHOLE OR IN PART WITHOUT WRITTEN CONSENT OF THE ENGINEER / ARCHITECT AND ANY INFRINGEMENT WILL BE SUBJECT TO LEGAL ACTIONG:\JobsEven\32210-00\Production\Civil\Drawings\032210.00-SITE.dwg, 11/21/2024 3:08:28 PM, sawyer sorrow PROJECT TITLE DRAWING TITLENO. RELEASEDCHECKEDDATE PAGEOF CHECKED DESIGNED JOB NO. DRAWN APPROVED DATE 2712 BULL STREET, SUITE ABEAUFORT, SOUTH CAROLINA 29902(843) 379-2222 SITE PLANCAROLINA INVESTMENTSBLUFFTON, SOUTH CAROLINA 29910 171 BURNT CHURCH ROAD - LOTRESIDENTIAL COMMUNITY 7C20021MSSMSS ARKWLR JULY 31, 202432210.001ISSUED TO BJWSAARK07/31/2024 PROJECT DATUM INFORMATION: HORIZONTAL DATUM: NAD 83VERTICAL DATUM: NAVD88 0040'80' SCALE: 1" = 40' R Know what'sbelow.before you dig.Call SOUTH CAROLINACERTIFICATE OF AUTHORIZATIONDAVIS &FLOYD, INCNo. C00538 SOUTH CAROLINA LICENSED PROFESSIONAL ENGINEERANDREW R. KLOSTERMANNo. 2823007/31/2024NOT FOR CONSTRUCTION SITE LEGENDCENTERLINE FENCELINEXXXXXXX CURBCURB AND GUTTER A.D.A. RAMP WITHDETECTABLE WARNINGS WHEEL STOPA.D.A. PARKING AND SIGNAGESIGNSTOP BAR(PAVEMENT MARKING)DIRECTIONAL ARROW(PAVEMENT MARKING) RETAINING WALL^^^^^^ PROPOSED CONCRETEPROPOSED HEAVY-DUTYCONCRETE PROPOSED HEAVY-DUTYASPHALT SITE LIGHTING FIXTURES PROPOSED LIGHT-DUTYASPHALT ONLY SIGN(PAVEMENT MARKING)ONLYPOINT OF INFLECTION N STATEPLANE SITE PLAN NOTES1.REFER TO GENERAL NOTES, SPECIFICATIONS, AND SCOPE OF WORK.2.ALL PUBLIC RIGHT-OF-WAYS AND ALL AMENITIES SHALL BE ADA COMPLIANT.3.EXISTING ADA ACCESSIBLE PUBLIC RIGHT-OF-WAYS MUST REMAIN ADA COMPLIANT DURINGCONSTRUCTION OR AN ALTERNATIVE ROUTE MUST BE PROVIDED.4.REFER TO LANDSCAPE PLANS FOR HARDSCAPE, FENCING, AND PLANTING DETAILS.5.ALL DIMENSIONS SHOWN ARE TO FACE OF CURB. TYPICAL CURB WIDTH IS 0.5'. WHERE NOCURB IS EXISTING OR PROPOSED, DIMENSIONS SHOWN ARE TO THE EDGE OF PAVEMENT. CURRENT ZONING: T4HC (HAMLET CENTER) SETBACKS FRONT: 10' MIN SIDE: 5' MIN SIDE STREET: 10' MIN REAR: 5' MIN LOT SIZE WIDTH: 50' MIN DEPTH: 75' MIN CURRENT ZONING: T3HN (HAMLET NEIGHBORHOOD) SETBACKS FRONT: 25' MIN SIDE: 10' MIN SIDE STREET: 15' MIN REAR: 15' MIN LOT SIZE WIDTH: 65' MIN DEPTH: 100' MIN HAMLET CENTER (T4HC) HAMLET NEIGHBORHOOD (T3HN) REZONE ALL PARCELS TO: T3N (NEIGHBORHOOD) SETBACKS FRONT: 15' MIN SIDE: 7.5' MAIN BLDG MIN; 5' ANCILLARY BLDG MIN. SIDE STREET: 10' MIN REAR: 15' MAIN BLDG MIN; 5' ANCILLARY BLDG MIN. LOT SIZE WIDTH: 50' MIN, 100' MAX DEPTH: 100' MIN, 200' MAX R600 039 000 1552 0000 ONE DEVONWOOD LLC 1.01 ACRES R600 039 000 0056 0000 GRAVES, LAWERENCE EARL JR TRUSTEE 5.00 ACRES R600 039 000 0269 0000 STRICKLAND, JONI LEWIS 5.04 ACRES 53 Item 10. 54 Item 10. BEAUFORT COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 86.56 ACRES LOCATED AT 98 JENNINGS ROAD (R100 028 000 0264 0000) FROM T2 RURAL (T2R) TO T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) UTILIZING THE HAMLET PLACE TYPE OVERLAY (PTO) MEETING NAME AND DATE: Natural Resources Committee Meeting, June 2 , 2025 PRESENTER INFORMATION: Robert Merchant, AICP, Director, Beaufort County Planning and Zoning (10 minutes needed for item discussion) ITEM BACKGROUND: This rezoning application went before the Beaufort County Planning Commission at their May 5, 2025, meeting. At that time, the Commission voted 7-1 to recommend denial of the proposed amendment to County Council. It was stated that the application failed to meet standards 1,4,5, and 7. A previous request to rezone to the C3 district was denied in May 2024; this request was to accommodate 184 single-family units. PROJECT / ITEM NARRATIVE: The applicant is seeking to amend the zoning of an 86-acre parcel. It is currently zoned T2 Rural, and the applicant is requesting a zoning amendment to T4 Hamlet Center and T3 Hamlet Neighborhood to accommodate 244 units comprised of single family detached and townhomes. The applicant has expressed the desire to enter a Development Agreement with County Council to provide 10 workforce housing units with closing credit up to $2,500 and $750 per unit toward rehabilitation for structures in the “vicinity” of the proposed development. The applicant also has expressed a desire to alter district standards in the DA. FISCAL IMPACT: Not applicable STAFF RECOMMENDATIONS TO COUNCIL: Staff recommends approval with the condition that the Development Agreement does not alter any district standards and that more affordable housing is offered. OPTIONS FOR COUNCIL MOTION: Motion to approve, modify, or deny the application as submitted;* Approval of the application with a reduction in the area proposed to be rezoned;* Approval of a rezoning to a more restricted base zone than requested in the application;* or Denial of the application.* *Council’s decision must be based on the standards in Section 7.3.40 C of the Community Development Code (Attachment A to this AIS) and must clearly state the factors considered in making its decision and the basis or rationale for the decision. (7.4.90 B.3). These factors are as follows: 55 Item 11. 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of this Development Code. In areas of new development, a finding of consistency with the Comprehensive Plan shall be considered to meet the standards below, unless compelling evidence demonstrates the proposed amendment would threaten the public health, safety, and welfare if the land subject to the amendment is classified to be consistent with the Comprehensive Plan; 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances; 3. Addresses a demonstrated community need; 4. Is required by changed conditions; 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land; 6. Would not adversely impact nearby lands; 7. Would result in a logical and orderly development pattern; 8. Would not result in adverse impacts on the natural environment—including, but not limited to, water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the environment; and 9. Would result in development that is adequately served by public facilities (e.g., streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities). Attachment A. CDC Section 7.3.40 B.7 Zoning Map Amendment (Rezoning) provides: The County Council’s decision shall be based on the standards in Subsection 7.4.30 C and shall be one of the following: 1. Approval of the application as submitted; 2. Approval of the application with a reduction in the area proposed to be rezoned; 3. Approval of a rezoning to a more restricted base zone than requested in the application; 4. Denial of the application. CDC Section 7.3.40 C. Zone Map Amendment Review Standards. The advisability of an amendment to the Official Zoning Map is a matter committed to the legislative discretion of the County Council and is not controlled by any one factor. In determining whether to adopt or deny a proposed Zone Map Amendment, the County Council shall weigh the relevance of and consider whether and the extent to which the proposed amendment: 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of t his Development Code. In areas of new development, a finding of consistency with the Comprehensive Plan shall be considered to meet the standards below, unless compelling evidence demonstrates the proposed amendment would threaten the public health, safety , and welfare if the land subject to the amendment is classified to be consistent with the Comprehensive Plan; 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances; 3. Addresses a demonstrated community need; 4. Is required by changed conditions; 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land; 56 Item 11. 6. Would not adversely impact nearby lands; 7. Would result in a logical and orderly development pattern; 8. Would not result in adverse impacts on the natural environment —including, but not limited to, water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the environment; and 9. Would result in development that is adequately served by public facilities (e.g., streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities). CDC Section 7.4.90 B.3 provides: County Council’s decision shall clearly state the factors considered in making the decision and the basis or rationale for the decision. 57 Item 11. REZONING REQUESTS I MOVE THAT WE GRANT/(DENY) THE REQUEST FOR REZONING FOR THE FOLLOWING REASONS (STATE ALL THAT SUPPORT YOUR MOTION). THE REQUEST: 1. IS/ (IS NOT) CONSISTENT WITH THE GOALS AND POLICIES OF THE COMPREHENSIVE CODE AND THE PURPOSES OF THE DEVELOPMENT CODE; ____ 2. IS (NOT/IS) IN CONFLICT WITH PROVISIONS OF THE DEVELOPMENT CODE AND OR OUR CODE OF ORDINANCES; _ 3. DOES/ (DOES NOT) ADDRESS A DEMONSTRATED COMMUNITY NEED; _____ 4. IS/ (IS NOT) REQUIRED BY CHANGED CONDITIONS; _ 5. IS/ (IS NOT) COMPATIBLE WITH EXISTING AND PROPOSED USE OF LAND SURROUNDING THIS LAND; ____ 6. WOULD NOT/ (WOULD) ADVERSELY AFFECT NEARBY LAND; 7. WOULD/ (WOULD NOT) RESULT IN LOGICAL AND ORDERLY DEVELOPMENT PATTERNS; ___ 8. WOULD NOT/ (WOULD) RESULT IN ADVERSE IMPACT ON THE NATURAL ENVIRONMENT (WATER, AIR, NOISE, STORMWATER MANAGEMENT, WILDLIFE, VEGITATION, WETLANDS, AND THE NATURAL FUNCTIONING OF THE ENVIRONEMENT); _______ 9. WOULD/ (WOULD NOT) RESULT IN DEVELOPMENT THAT IS ADEQUATELY SERVED BY PUBLIC FACILITITES (STREETS, POTABLE WATER, SEWER, STORMWATER MANAGEMENT, SOLID WASTE COLLECTION AND DISPOSAL, SCHOOLS, PARKS, POLICE, FIRE, EMERGENCY MEDICAL FACILITIES). _ _ _ 58 Item 11. ORDINANCE 2025/________ AN ORDINANCE AMENDING THE ZONING MAP FOR 86.56 ACRES LOCATED AT 98 JENNINGS ROAD (R100 028 000 0264 0000) FROM T2 RURAL (T2R) TO T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) UTILIZING THE HAMLET PLACE TYPE OVERLAY (PTO) WHEREAS, the property located at 98 Jennings Road (R100 028 000 0264 0000) is currently zoned T2 Rural; and WHEREAS, the applicant has requested to change the zoning of the property to T4 Hamlet Center and T3 Hamlet Neighborhood utilizing a Hamlet Place Type Overlay; and WHEREAS, the Beaufort County Comprehensive Plan encourages high quality development in walkable urban nodes as opposed to low density sprawl and designates this site as a location to implement a Hamlet Place Type; and WHEREAS, the Beaufort County Planning Commission considered the request on May 5, 2025, voting 7-1 to recommend that County Council deny the request; and WHEREAS, County Council now wishes to amend the zoning map to change the zoning of the property from T2 Rural to T4 Hamlet Center and T3 Hamlet Neighborhood. NOW, THEREFORE be it ordained by County Council in a meeting duly assembled as follows: To adopt an ordinance amending the zoning map for 86.56 acres (R100 028 000 0264 0000) located at 98 Jennings Road from T2 Rural to T4 Hamlet Center and T3 Hamlet Neighborhood utilizing the Hamlet Place Type Overlay. Ordained this ___ day of ______________, 2025 _________________________ Alice Howard, Chair ___________________________ Sarah Brock, Clerk to Council 59 Item 11. 60 Item 11. CDPA-000048-2025– 98 Jennings Rezoning Page 1 of 5 TO: York Glover, Chair, Natural Resources Committee of County Council FROM: Robert Merchant, AICP, Beaufort County Planning and Zoning Department DATE: May 9, 2025 SUBJECT: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 86.56 ACRES LOCATED AT 98 JENNINGS ROAD (R100 028 000 0264 0000) FROM T2 RURAL (T2R) TO T3 HAMLET NEIGHBORHOOD (T3HN) AND T4 HAMLET CENTER (T4HC) UTILIZING THE HAMLET PLACE TYPE OVERLAY (PTO) STAFF REPORT: A. BACKGROUND: Case No. CDPA-000048-2025 Owner: Claire Nitze Applicant: Josh Tiller Property Location: 98 Jennings Rd District/Map/Parcel: R100 028 000 0264 0000 Property Size: 86 acres Current Future Land Use Neighborhood Mixed-Use with Hamlet PTO Designation: Current Zoning District: T2 Rural Proposed Zoning District: T3 Hamlet Neighborhood and T4 Hamlet Center B. SUMMARY OF REQUEST: The applicant previously requested a rezoning of the property to C3 to potentially accommodate 184 single-family dwelling units. The staff recommendation at that time was for denial due to it not being a Place Type. It went before the Planning Commission on March 4, 2024, with a unanimous vote of denial, Land Use Committee April 8, 2024, with a unanimous vote of denial, and one reading of County Council on May 13, 2024 with a 7-2 vote of denial. Per Section 7.4.100, if a development application requiring a public hearing is denied, no application proposing the same or similar development on all or MEMORANDUM 61 Item 11. CDPA-000048-2025– 98 Jennings Rezoning Page 2 of 5 part of the same land shall be submitted within one year after the date of denial. However, the applicant is now submitting a Place Type Overlay which is not considered a similar development. The applicant is requesting a rezoning from T2R to T3HN and T3HC to yield 244 dwelling units consisting of single-family detached and townhomes. The applicant has expressed interest in working with County Council on a Development Agreement that would be approved concurrently with this zoning amendment. The applicant has provided a draft attached; however, it is important to note that Council has not begun any review nor negotiation to date with respect to this Development Agreement. The applicant has expressed an interest in providing 10 units for workforce housing capped at 80-120% of AMI ($80,700-$127,700) with a closing credit/down payment assistance of up to $2,500 for those purchasing under the workforce housing process. The developer also agrees to provide up to $750 per unit toward rehabilitation of existing local structures in the vicinity of the development. The number of structures, the process, and the “vicinity” have yet to be stated. The applicant has expressed the desire to use the Development Agreement to vary from the CDC’s architectural standards. The South Carolina Local Government Development Agreement Act states “a development agreement and authorized development must be consistent with the local government's comprehensive plan and land development regulations.” Development Agreements are not meant to relax the design standards that are integral to the character that the districts are meant to facilitate. On April 7th, 2025, the applicant requested a deferral in order to address staff’s concerns of the Regulating Plans. The applicant has since addressed all comments including transect organization, civic space type/features, and addressed the cross-section where this development fronts Jennings Road. C. EXISTING ZONING: The lot is currently zoned T2 Rural (T2R), which permits residential development at a density of one dwelling unit per three acres; this site could yield 27 homes maximum. T2 Rural also permits very limited non-residential uses. A portion of this parcel is located in Noise Zone 1 which requires notification to the Marine Corps Air Station; this portion is proposed civic space. D. PROPOSED ZONING: Through the utilization of a Hamlet Place Type, the applicant is proposing T3HN and T4HC. T3HN is intended to reinforce established neighborhoods, to maintain neighborhood stability and provide a transition between the walkable neighborhood and rural areas. T4HC is intended to integrate appropriate, medium-density residential building types, such as duplexes, townhouses, small courtyard housing, and mansion apartments in an environment conducive to walking and bicycling. E. TRAFFIC IMPACT ANALYSIS (TIA): According to Section 6.3.20.D of the CDC, “An application for a rezoning shall include a TIA where the particular project or zoning district may result in 62 Item 11. CDPA-000048-2025– 98 Jennings Rezoning Page 3 of 5 a development that generates 50 trips during the peak hour or will change the level of service of the affected street.” The Ramsey Farms TIA is complete and has been approved. Of the several intersections studied, mitigation will be required at WK Alston and Broad River Boulevard because the Level of Service (LOS) of this intersection falls below the County’s TIA ordinance standard of LOS D. The degradation of the LOS of this intersection is due to the adjacency of other approved developments including Ramsey Farms. Therefore, the methodology for funding and implementing the recommended mitigation measure will be determined by the County prior to the issuance of occupancy permits. F. ZONING MAP AMENDMENT REVIEW STANDARDS: In determining whether to adopt or deny a proposed Zone Map Amendment, the County Council shall weigh the relevance of and consider whether and the extent to which the proposed amendment: 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of this Development Code; Yes, a rezoning of this property implementing the Hamlet PTO is the future land designation of this parcel. 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances; Yes, it is not in conflict. 3. Addresses a demonstrated community need; The applicant has indicated through the Development Agreement to implement 10 units for workforce housing with a closing credit/down payment assistance of up to $2,500. The developer also agrees to provide up to $750 per unit toward rehabilitation of existing local structures in the vicinity of the development. The provision of Workforce Housing is a goal of the Comprehensive Plan. 4. Is required by changed conditions; No, it is not. 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land; The character of the surrounding area is rural residential; however, it is in proximity to Battery Creek High School and Mint Farms, a similar single-family residential subdivision. 6. Would not adversely affect nearby lands; The TIA states that the proposed rezoning would generate the following peak hour trips: 152 AM PEAK, 155 SCHOOL PM PEAK, and 201 PM PEAK. 63 Item 11. CDPA-000048-2025– 98 Jennings Rezoning Page 4 of 5 7. Would result in a logical and orderly development pattern; Yes, the regulating plan places the higher density district along Jennings Road which places it in closest proximity to Battery Creek High School. 8. Would not result in adverse impacts on the natural environment – including, but not limited to, water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the environment: Any development on the site would be required to adhere to the natural resource protection, tree protection, wetland protection, and stormwater standards in the Community Development Code and the Stormwater BMP Manual. 9. Would result in development that is adequately served by public facilities (e.g.. streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities: The School District, Air Station, and BJWSA have been notified. G. STAFF RECOMMENDATION: Staff recommends approval under the conditions that the applicant work with County Council through a Development Agreement to best determine the need for affordable housing in the area. This process would need to ensure more affordable units at a cost obtainable to neighboring residents of the community. It is recommended that no alterations to the standards be allowed in the Development Agreement. H. PLANNING COMMISSION RECOMMENDATION: At their May 5, 2025, meeting, the Planning Commission made a motion to recommend approval of the application with the conditions set forth in the staff report’s Staff Recommendation. The motion failed 2-6. A motion was made to recommend denial of the application based on the review standards 1,4,5 and 7 not being met. The motion passed 7-1. I. ATTACHMENTS • Zoning Map (existing and proposed) • Application • TIA • Development Agreement 64 Item 11. T2R C3NMU C3NMU T3HN T4HC C3NMU C3NMUC3NMU C5RCMU RAMSEY RD JENNINGS RD DRAFTS WAY RIVERSHILL RD APPLEMINT LN CALICO CT ALEXANDER WAY POSSUM HILL RD BLUE DOLPHIN DR OUTREACH LN RAMSEY RD JENNINGS RD DRAFTS WAY RIVERS HILLRD CALICO CT GLAZE DR ALEXANDER WAY RAMBLIN R D BLUE DOLPHIN DR POSSUM HILLRD OUTREACH LNTHOMASINA DR RAMSE Y LOOP T2R C3NMU C3NMU C3NMU C3NMU T2R Legend R100 28 264 Zone Districts FBCode Buckingham Landing Community Preservation[BLCP] C3 Neighborhood Mixed Use [C3NMU] C4 Community Center Mixed Use [C4CCMU] C5 Regional Center Mixed Use [C5RCMU] May River Community Preservation [MRCP] Existing Planned Unit Development [PUD] T1 Natural Preserve [T1NP] T2 Rural [T2R] T2 Rural Center [T2RC] T2 Rural Neighborhood [T2RN] T3 Edge [T3Edge] T3 Hamlet Neighborhood [T3HN] T3 Neighborhood [T3N] T4 Hamlet Center [T4HC] T4 Hamlet Center Open [T4HCO] T4 Neighborhood Center [T4NC] Existing Zoning Proposed Zoning Legend R100 28 264 FBCode Buckingham Landing Community Preservation[BLCP] C3 Neighborhood Mixed Use [C3NMU] C4 Community Center Mixed Use [C4CCMU] C5 Regional Center Mixed Use [C5RCMU] May River Community Preservation [MRCP] Existing Planned Unit Development [PUD] T1 Natural Preserve [T1NP] T2 Rural [T2R] T2 Rural Center [T2RC] T2 Rural Neighborhood [T2RN] T3 Edge [T3Edge] T3 Hamlet Neighborhood [T3HN] T3 Neighborhood [T3N-O] T4 Hamlet Center [T4HC] T4 Hamlet Center Open [T4HCO] T4 Neighborhood Center [T4NC] R600 022 000 011A 0000 65 Item 11. 181 Bluffton Road Suite B104 Bluffton, South Carolina 29910 Voice: 843.815.4800 jktiller@jktiller.com Fax: 843.815.4802 Comprehensive Land Planning ■ Landscape Architecture ZONING MAP AMENDMENT NARRATIVE FOR A REQUEST FOR REVIEW OF APPLICATION FOR THE ZONING MAP AMENDMENT BY Ramsey Farm LP (Claire Nitze) CONCERNING 98 Jennings Rd (R100 028 000 0264 0000) BEAUFORT COUNTY, SOUTH CAROLINA This project narrative is submitted to the Beaufort County Planning Department as a portion of an application for Zoning Map Amendment of the Ramsey Farm LP’s (“Owner”) property at 98 Jennings Road, currently zoned Rural T2R. This narrative is submitted to the Beaufort County Planning Commission and the Beaufort County Council to explain the request and describe how the Application meets the criteria of the Section 7.3.50 [Place Type Overlay (Rezoning)] of the Community Development Code (“CDC”) and to explain the reason(s) for the zoning request as required by the Application for rezoning. Our foremost goal is to ensure that Beaufort County residents have access to affordable entry- level housing. To support this, a separate Development Agreement is being prepared in collaboration with the county and the Beaufort Jasper Housing Trust to establish the framework and details for this initiative. The agreement's details will be finalized through negotiations with county staff and the County Council’s Community Services and Land Use Committee prior to the PTO’s first reading at County Council. I. NARRATIVE a. Introduction, Background, and Request The Property located at 98 Jennings Road is an approximately 86.56 acre parcel of real property identified by Beaufort County Tax map number R100 028 000 0264 0000, (“Property”), currently zoned Rural Neighborhood (T2R), located within the unincorporated Beaufort County and bounded to the south by several vacant and residential parcels that are zoned Neighborhood Mixed-Use (C3NMU), to east by Ramsey Road, to the west by Jennings Road, and to the north several parcels zoned Rural (T2R). The property is accessed from both Ramsey and Jennings Roads. 66 Item 11. 2 The existing 86.56 acre property has been used to farm planted pines over the years. Of the 86.56 acres, approximately 5.1 acres are wetlands, the largest of which occupies the southeast corner of the property. The property owner is seeking a rezoning to a Hamlet Place Type designation of the Place Type Overlay (PTO), consisting of T4 Hamlet Center (T4HC- 36%) and T3 Hamlet Neighborhood (T3HN- 64%), aligning with the Comprehensive Plan. This parcel meets the minimum 80 Acre site requirement for the Hamlet Place Type designation in the Beaufort County Community Development Code. Additionally, PTO is compatible C3NMU zoning of adjacent parcels to the southwest, south, and east. This proposal is in line with the Comprehensive Plan's Future Land Use Map, designating the area as Neighborhood Mixed-Use, consistent with the existing zoning of neighboring properties to the north and west of the parcel. The expansion of mixed-use development is intended to diversify commercial and residential options, fostering a centralized development that bolsters employment opportunities while preserving the rural character of northern Beaufort County. (See Attached Transect Regulating Plan, PTO Regulating Plan, and Natural Resources, Wetlands, & Civic Space Plan) Furthermore, there is a likelihood that the property will be developed for single- family residential use, catering to the housing needs of Marine Corps Air Station families by offering entry-level housing options. Streets and alleys will be privately owned. All streets will be based on the Neighborhood Edge Street standards. All alleyways will have a 20’ ROW and 14’ travel lane. The eastern side of Jennings road will meet the standards for the Neighborhood Edge Street “Local” if permitted by the SCDOT. (See attached Thoroughfare Standards Exhibit and Jennings Road Street Section Exhibit) 67 Item 11. 3 The Owner submits this Application requesting the approval of: An amendment to the County’s Zoning Map designating the Property with the zoning district of Hamlet Place Type designation of the Place Type Overlay zoning with land uses described listed in the CDC Division 3.4.80 and illustrated in the 68 Item 11. 4 attached Transect Regulating Plan and PTO Regulating Plan. II. REZONING CRITERIA a. Applicability. The current zoning for the Property is Rural Neighborhood (T2R). The proposed amendment requests designating Hamlet Place Type of the Place Type Overlay District. This designation is in keeping with the Beaufort County Comprehensive Plan’s provision that the PTO shall be used when the property is upzoned. Hamlets are typically larger and more intense than rural crossroads and are often located at the edge of the rural and urban condition. A hamlet often has a small, pedestrian-oriented main street with surrounding and supporting residential fabric that is scaled to the size of a pedestrian shed. The main street and surrounding residential fabric transitions quickly into agricultural uses and/or the natural environment. b. Application Review Criteria. [CDC Division 7.3.50 – Place Type Overlay (Rezoning) Review Standards]. The Owner proposes that this Application satisfies or exceeds the requirements for a Zoning Map Amendment as set forth below. c. Consistency with the 2040 Beaufort County Comprehensive Plan i. NATURAL ENVIRONMENT – The distinctive charm of Beaufort County is closely tied to its abundant natural resources. The county is committed to maintaining a harmonious equilibrium between human activities and the preservation of its natural environment. Any potential 69 Item 11. 5 redevelopment will align with the Comprehensive Plan's objectives, specifically focusing on Water Quality and Quantity, Habitat Preservation and Protection, Environmental Education and Outreach with the Public, and the promotion of Sustainable Development. Presently utilized as a pine plantation, the property has undergone clear-cutting and replanting cycles over the past few decades . The development of the parcel will not result in adverse impacts to the natural environment or cause detrimental effects to the surrounding natural ecosystem. ii. CULTURE– Preserving and safeguarding Beaufort County's rich cultural heritage and history remains a top priority for the county. It is crucial to acknowledge evolving socio- economic and cultural trends while actively promoting the arts. The proposed amendment aligns with the Cultural Resources element of the Comprehensive Plan, underscoring the county's commitment to these objectives. The military presence in the area significantly influences the local economy. Given the site's proximity to the Marine Corps Air Station, the proposed rezoning presents a valuable opportunity to expand housing options for service members' families. This strategic rezoning initiative aims to address the housing needs of Beaufort County's diverse population, contributing to a more inclusive and thriving community. iii. ECONOMY – The Comprehensive Plan underscores the importance of enhancing options for entry -level housing to address the diverse economic needs essential for sustaining the vitality of Beaufort County's community. Instead of solely focusing on attracting new businesses and industries to diversify the tax base, the establishment of entry -level housing opportunities aims to provide housing that supports the County's growing economies. This is achieved by strengthening and expanding the business tax base while simultaneously creating quality, value-added housing options for residents. Within the framework of the Comprehensive Plan, a key objective is to ensure a sufficient supply of appropriately located land zoned for a Hamlet. This strategic allocation aims to promote the economic well - being and diversity of the region. Additionally, the Economy component of the Comprehensive Plan advocates for the planning, development, and permitting of PTO developments tailored to appeal to young professionals and military families . In this context, the rezoning to Place Type Overlay (Hamlet Place Type designation) offers an opportunity to extend and diversify the predominantly rural residential tax base. The focus shifts towards accommodating the housing needs of the workforce, thereby creating a more resilient and inclusive foundation for Beaufort County's economic sustainability. iv. MOBILITY – In the realm of urban planning, careful consideration is given to aspects such as land use development, mobility, public safety, infrastructure costs, environmental conservation, and the visual and 70 Item 11. 6 economic appeal of neighborhoods and communities. The tangible consequences of new growth, particularly in terms of diminished quality of life due to traffic congestion, underscore the importance of comprehensive planning. The introduction of the Place Type Overlay zoning, allowing for mix of residential options, not only promotes local and diverse housing options but also serves to curtail extensive vehicle travel, thereby safeguarding road capacity. Moreover, this zoning initiative goes beyond by incorporating measures to enhance interconnectivity, introducing a secondary street infrastructure that strategically improves traffic impacts. By facilitating smoother traffic flow, these additional enhancements contribute to an overall improvement in the livability and functionality of neighborhoods. Additionally, the rezoning effort enables the establishment of housing in closer proximity to employment centers, ensuring greater accessibility for future residents and fostering a more sustainable and interconnected urban environment. v. HOUSING – With the uptick in housing prices and a trend reflecting the migration of affluent retirees to the area, housing accessibility is becoming an increasing priority. Under the proposed zoning, suitable entry-level housing can be provided near employment opportunities. The allowed residential uses under the proposed zoning address barriers to housing accessibility, as recommended in the Comprehensive Plan. The option to provide entry -level housing on this site would mean that the County can more easily protect and preserve the family compounds prevalent in the rural areas of Northern Beaufort County. vi. COMMUNITY FACILITIES – County departments offer a range of services, encompassing General Government, Detention Center, Emergency Management, EMS, Libraries, Park and Recreations, as well as Solid Waste/ Recycling. The suggested rezoning to Place Type Overlay (PTO) is anticipated to have no adverse effects on the mission and objectives of community facilities. Given the property's existing management under pine plantation, it already accommodates many of these services. Any alterations in land use resulting from the rezoning are expected to balance the demand by augmenting the tax revenue base. Additionally, it's worth noting that the local schools near the parcel currently operate under capacity. vii. BUILT ENVIRONMENT – Effective land use planning serves as the cornerstone for all redevelopment initiatives within the County, ensuring a balanced and sustainable distribution of various land use categories to meet both present and future community needs. Looking ahead, growth management will persistently prioritize redevelopment, employing innovative strategies to adapt to unique conditions. The identified parcel and its adjacent area are designated as "Neighborhood Mixed-Use" and/or “Place Type Overlay” on the Future Land Use Map of the Comprehensive Plan. The current property usage falls short of aligning with the standards of neighboring development, impacting quality of life and limiting diverse housing opportunities. The proposed rezoning aims to expand the range and diversity of existing land uses in the vicinity. 71 Item 11. 7 The Comprehensive Plan indicates that the average population growth in this area is driven by individuals seeking retirement and economic opportunities. The relocating population tends to be well -educated, affluent, and residing in smaller households. Projections in the Comprehensive Plan foresee substantial residential growth in Northern Beaufort County, particularly in this section. Recent population trends validate these expectations. The Comprehensive Plan recommends strategies focused on creating walkable communities with a variety of housing options. The Place Type Overlay zoning, as outlined in the 2040 Beaufort County Atlas, facilitates high -quality, moderately dense residential development, incorporating denser zones for multi -family and mixed-use structures to promote walkability and affordable housing choices. Design requirements aim to cultivate a suburban character while encouraging both pedestrian and automobile access. viii. FOCUSED PLANNING AREAS – This parcel is situated within the Beaufort & Port Royal Planning Areas. The adoption of the 2020 Beaufort County Comprehensive Plan, in conjunction with the Port Royal Comprehensive Plan, presented an opportunity to establish unified planning principles. In the Beaufort & Port Royal Focal Area, particular attention should be given to the redesign of roads for enhanced safety, multimodal accessibility, and a human- scaled environment. Prioritizing plans for a Palmetto Breeze trolley service connecting Port Royal and Downtown Beaufort is crucial, as it would significantly contribute to mobility and a cohesive sense of place. For growth management west of Port Royal, guidance should be derived from Place Types influenced by the Greenprint Overlay Map, the existing transportation network, and the potential integration of a trolley service. Introducing a new Town Place Type along Parris Island Gateway is proposed to create a walkable destination and residential space, fostering a distinct sense of place and identity for this specific County area. Successful execution of the Port Royal and Beaufort County plans relies on joint planning, cooperation, an annexation strategy, and shared standards for development and infrastructure services. As outlined in the Comprehensive Plan for the Beaufort & Port Royal Planning Area, the recommended future land use for this parcel is Place Type Overlay zoning. d. Is not in conflict with any provision of this Development Code, or the Code of Ordinances. The Property is designated, according to the Future Land Use Map. In compliance with an upzoning of the property, the PTO is compatible and consistent with the adjacent properties and with the Future Land Use Map in the Comprehensive Plan. e. Addresses a demonstrated community need. In the northern part of Beaufort County, the predominant tax base consists of rural residential areas. The suggested rezoning aims to promote a range of entry level housing options. As stated in the Comprehensive Plan, the most suitable option for the property is the 72 Item 11. 8 PTO, which aligns with the community’s immediate needs or long-term development objectives. f. Is required by changed conditions. The use of the property as a pine planation is no longer considered its optimal use. The prospective owners aim to align the property's zoning with the Future Land Use Map outlined in the Comprehensive Plan. They envision transforming the land into entry-level housing to meet the housing needs of the growing employment base in northern Beaufort County. Given the county's remarkable rate of growth, which is expected to persist, there is a pressing need to address the imbalance between high demand and limited supply. Rezoning this property presents an opportunity to tackle this crucial issue of accommodating the area's rapid growth. g. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land. Owing to its close proximity to neighboring parcels presently zoned as Neighborhood Mixed- Use (C3NMU) and the Future Land Use Map designating adjacent parcels as C3NMU and/or PTO, the proposed zoning aligns seamlessly with the surrounding zoning and land uses. This parcel is poised to function as a natural extension of the existing Neighborhood Mixed-Use (C3NMU) in this area. The PTO designation, as determined by the Comprehensive Plan, is the most appropriate zoning designation for the property. h. Would not adversely impact nearby lands. The newly implemented stormwater ordinance in the County will be applicable to all forthcoming property developments. Furthermore, these future developments will incorporate open space and natural resource protection to safeguard adjacent properties against any visual impacts. The 12.91 Acres of Civic Space, and the 10% (T4HC) & 20% (T3HN) Natural Resource Protection will go a long way towards proper stewardship of the land. i. Would result in a logical and orderly development pattern. The location is conveniently reachable from both Jennings and Ramsey Roads, seamlessly linking to the neighboring development layout and offering the potential for a secure and pedestrian-friendly community experience. j. Would not result in adverse impacts on the natural environment—including, but not limited to, water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the environment. The property’s future development would meet or exceed the County’s current development standards for Civic Space, natural resource protection, and stormwater management. k. Would result in development that is adequately served by public facilities (e.g., streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities). It is anticipated that the proposed rezoning and redevelopment will be served by existing utilities and community facilities. There is adequate space to address stormwater on site for any development. No additional roadways would be required to serve this site. 73 Item 11. 9 III. CONCLUSION. a. The Owner believes the foregoing narrative and analysis demonstrates that this Application for Zoning Map Amendment is in conformance with the County’s Comprehensive Plan and meets the criteria of the CDC Division 7.3.50. Accordingly, the Owner respectfully requests that the Planning Commission and County Council: b. Review this Application and the supporting documentation. c. Find the following: i. That this Application is consistent with and furthers the goals and policies of the Comprehensive Plan and the purposes of this Development Code. ii. That this Application is not in conflict with any provision of this Development Code, or the Code of Ordinances iii. That this Application addresses a demonstrated community need. iv. That this Application is required by changed conditions. v. That this Application is compatible with existing and proposed uses surrounding the land subject to the application and is the appropriate zone and uses for the land. vi. That this Application would not adversely impact nearby lands. vii. That this Application would result in a logical and orderly development pattern. viii. That this Application would not result in adverse impacts on the natural environment. ix. That this Application would result in development that is adequately served by public facilities. d. Recommend approval of this Application and the rezoning of the Place Type Overlay (Hamlet Place Type designation) with the uses and density set forth in the Beaufort County Community Development Code, and in accordance with the attached Transect Regulating Plan and PTO Regulating Plan. Respectfully re-submitted on behalf of the Owner this 18th day of April 2025. Regards, Josh K. Tiller, PLA, ASLA President, J.K. Tiller Associates, Inc. 74 Item 11. 75 Item 11. 76 Item 11. 77 Item 11. 78 Item 11. 79 Item 11. March 2025 © Kimley-Horn and Associates, Inc. Ramsey Farm Residential Development Traffic Impact Analysis Beaufort County, South Carolina Prepared for Beaufort County Prepared by Final Draft 80 Item 11. March 2025 © Kimley-Horn and Associates, Inc. 1080 Morrison Drive, Suite 240 Charleston, South Carolina, 29403 Ramsey Farm Residential Development Traffic Impact Analysis Beaufort County, South Carolina Prepared for Beaufort County Prepared by Final Draft 81 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page i March 2025 Table of Contents Executive Summary ................................ ................................ ................................ .................iii 1 Introduction ................................ ................................ ................................ ...........................1 1.1 Existing Conditions................................ ................................ ................................ ...................... 1 2 Project Traffic ................................ ................................ ................................ .......................5 2.1 Trip Generation ................................ ................................ ................................ ........................... 5 2.2 Trip Distribution & Assignment ................................ ................................ ................................ .... 5 3 Traffic Volume Development................................ ................................ ................................ 8 3.1 2024 Existing Traffic Development ................................ ................................ .............................. 8 3.2 2028 No-Build Traffic Development ................................ ................................ ............................. 8 3.3 2028 Build Traffic Development ................................ ................................ ................................ ... 8 4 Capacity Analysis ................................ ................................ ................................ ...............15 4.1 Broad River Boulevard at Jennings Road ................................ ................................ .................. 16 4.2 County Shed Road at Jennings Road ................................ ................................ ........................ 17 4.3 Jennings Road at Drafts Way/Site Access #1 ................................ ................................ ............ 18 4.4 Broad River Boulevard at Ramsey Road ................................ ................................ ................... 19 4.5 County Shed Road at Ramsey Road ................................ ................................ ......................... 20 4.6 Parris Island Gateway at County Shed Road ................................ ................................ ............. 21 4.7 Broad River Boulevard at WK Alston Drive ................................ ................................ ................ 23 4.8 Parris Island Gateway at Broad River Boulevard/Church Access ................................ ............... 24 4.9 Ramsey Road at Site Access #2 ................................ ................................ ............................... 25 5 Conclusion ................................ ................................ ................................ ..........................26 Final Draft 82 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page ii March 2025 List of Figures Figure 1 – Project Location Map ................................ ................................ ................................ .3 Figure 2 – 2024 Existing Lane Geometry ................................ ................................ ....................4 Figure 3 – AM and PM Project Trip Distribution and Assignment ................................ ................6 Figure 4 – School Dismissal Project Trip Distribution and Assignment ................................ ........7 Figure 5 – 2024 Existing AM and PM Peak Hour Traffic Volumes ................................ ...............9 Figure 6 – 2024 Existing School Dismissal Peak Hour Traffic Volumes................................ .....10 Figure 7 – 2028 No-Build AM and PM Peak Hour Traffic Volumes ................................ ............11 Figure 8 – 2028 No-Build School Dismissal Peak Hour Traffic Volumes ................................ ...12 Figure 9 – 2028 Build AM and PM Peak Hour Traffic Volumes ................................ .................13 Figure 10 – 2028 Build School Dismissal Peak Hour Traffic Volumes ................................ .......14 List of Tables Table 1 – Trip Generation Summary ................................ ................................ ...........................5 Table 2 – HCM Level of Service Criteria ................................ ................................ ...................15 Table 3 – Broad River Boulevard at Jennings Road Capacity Analysis Results ........................16 Table 4 – County Shed Road at Jennings Road Capacity Analysis Results .............................. 17 Table 5 – Jennings Road at Drafts Way/Site Access #1 Capacity Analysis Results ..................18 Table 6 – Broad River Boulevard at Ramsey Road Capacity Analysis Results..........................19 Table 7 – County Shed Road at Ramsey Road Capacity Analysis Results ............................... 20 Table 8 – Parris Island Gateway at County Shed Road Capacity Analysis Results ...................21 Table 9 – Broad River Boulevard at WK Alston Drive Capacity Analysis Results ......................23 Table 10 – Parris Island Gateway at Broad River Boulevard/Church Access Capacity Analysis Results ................................ ................................ ................................ ................................ ......24 Table 11 – Ramsey Road at Site Access #2 Capacity Analysis Results ................................ ....25 List of Appendices A – Conceptual Site Plan B – Trip Generation Calculations C – Traffic Volume Development Worksheets D – Raw Turning Movement Counts E – Historic Growth Rate Calculation F – Approved Developments G – Capacity Analysis Worksheets H – Turn Lane Warrant Analysis Final Draft 83 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page iii March 2025 Executive Summary The proposed Ramsey Farm Residential Development is located on Assessor’s Parcel Number R100 028 000 0264 0000 northeast of the Broad River Boulevard at Jennings Road intersection in Beaufort County, South Carolina. The Ramsey Farm Residential Development is anticipated to consist of 160 single family detached units and 84 townhome units. The anticipated project traffic will access the roadway network via two proposed full-movement, stop-controlled intersections. Site Access #1 will align with the existing Jennings Road at Drafts Way intersection. Site Access #2 is located along Ramsey Road, approximately one third of a mile south of County Shed Road. The project is proposed to be constructed and fully occupied by 2028. This study summarizes the results of the traffic analyses during the AM, School Dismissal, and PM peak hours for 2024 Existing, 2028 No-Build, 2028 Build, and 2028 Build Improved conditions at the following study intersections: 1.) Broad River Boulevard at Jennings Road 2.) County Shed Road at Jennings Road 3.) Jennings Road at Drafts Way/Site Access #1 4.) Broad River Boulevard at Ramsey Road 5.) County Shed Road at Ramsey Road 6.) Parris Island Gateway at County Shed Road/Ice House Road 7.) Broad River Boulevard at WK Alston Drive 8.) Parris Island Gateway at Broad River Boulevard/Church Access 9.) Ramsey Road at Site Access #2 Traffic operations were evaluated under 2024 Existing, 2028 No-Build, 2028 Build, and 2028 Build Improved conditions during the AM, School Dismissal, and PM peak hours of travel. With the addition of traffic associated with the proposed development, the following improvements are recommended: Broad River Boulevard at WK Alston Drive · Construct an eastbound right-turn lane with 200 feet of full width storage and a 150-foot taper. o Please note, other nearby developments are contributing to the need for this improvement in the no-build conditions Jennings Road at Drafts Way/Site Access #1 · Please note, the capacity analysis contained within this TIA assumes Site Access #1 will align with Drafts Way. The offset intersection shown in the site plan for Site Access #1, will not be allowed by Beaufort County. The concept plan will need to be updated to show Site Access #1 aligning with Drafts Way. · Site Access #1 is recommended to operate as full-movement, under minor street stop- control with a single ingress and a single egress lane. Ramsey Road at Site Access #2 · Site Access #2 is recommended to operate as full-movement, under minor street stop- control · Site Access #2 is recommended to be constructed with a single ingress and a single egress lane. Final Draft 84 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 1 March 2025 1 Introduction The proposed Ramsey Farm Residential Development is located on Assessor’s Parcel Number R100 028 000 0264 0000 northeast of the Broad River Boulevard at Jennings Road intersection in Beaufort County, South Carolina. The Ramsey Farm Residential Development is anticipated to consist of 160 single family detached units and 84 townhome units. The anticipated project traffic will access the roadway network via two proposed full -movement, stop-controlled intersections. Site Access #1 will align with the existing Jennings Road at Drafts Way intersection. Site Access #2 is located along Ramsey Road, approximately one third of a mile south of County Shed Road. The location of the proposed development and existing lane geometry are illustrated in Figure 1 and Figure 2, respectively. A conceptual site plan is provided in Appendix A. Please note, the capacity analysis contained within this TIA assumes Site Access #1 will align with Drafts Way. The offset intersection, shown in the site plan for Site Access #1, will not be allowed by Beaufort County. The concept plan will need to be updated to show Site Access #1 aligning with Drafts Way. This study summarizes the results of the traffic analyses during the AM, School Dismissal, and PM peak hours for 2024 Existing, 2028 No-Build, 2028 Build, and 2028 Build Improved conditions at the following study intersections: 1.) Broad River Boulevard at Jennings Road 2.) County Shed Road at Jennings Road 3.) Jennings Road at Drafts Way/Site Access #1 4.) Broad River Boulevard at Ramsey Road 5.) County Shed Road at Ramsey Road 6.) Parris Island Gateway at County Shed Road/Ice House Road 7.) Broad River Boulevard at WK Alston Drive 8.) Parris Island Gateway at Broad River Boulevard/Church Access 9.) Ramsey Road at Site Access #2 1.1 Existing Conditions Parris Island Gateway is a four-lane urban principal arterial, divided by a two-way left turn lane (TWLTL) and has posted speed limit of 35 miles per hour (MPH) in the vicinity of the study area. According to SCDOT count station data, Parris Island Gateway carried an annual average daily traffic (AADT) count of 18,400 vehicles per day in (VPD) 2023. Broad River Boulevard is an undivided two-lane urban major collector with a posted speed limit of 35 MPH east of Ramsey Road and 45 MPH to the west . According to SCDOT count station data, County Shed Road carried an AADT of 7,000 VPD in 2023. County Shed Road is an undivided two -lane urban local road with a posted speed limit of 45 MPH in the vicinity of the study area. According to SCDOT count station data, County Shed Road carried an AADT of 2,700 VPD in 2023. Final Draft 85 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 2 March 2025 Jennings Road is a two-lane urban local road with a posted speed limit of 45 MPH. SCDOT does not provide AADT data along Jennings Road. Ramsey Road is an undivided two -lane urban local road with no posted speed limit. Based on SCDOT Road Information System (RIS ) classification, the assumed speed limit is 35 MPH. SCDOT does not provide AADT data along Jennings Road. Drafts Way is an undivided two -lane private road with no posted speed limit and serves as an access to Battery Creek High School. SCDOT does not provide AADT data along Jennings Road. WK Alston Drive is an undivided two-lane urban local road with a posted speed limit of 35 MPH. SCDOT does not provide AADT data along Jennings Road. Final Draft 86 Item 11. Project Site Ramsey Farm Residential Development Figure 1 - Project Location Map Study Intersections 1.) Broad River Boulevard at Jennings Road 2.) County Shed Road at Jennings Road 3.) Jennings Road at Drafts Way/Site Access #1 4.) Broad River Boulevard at Ramsey Road 5.) County Shed Road at Ramsey Road 6.) Parris Island Gateway at County Shed Road/Ice House Road 7.) Broad River Road at WK Alston Drive 8.) Parris Island Gateway at Broad River Road/Church Access 9.) Ramsey Farm Road at Site Access #2 1 3 4 8 6 7 5 2 Ramsey Road Jennings Road WK Alston Drive Church Access 9 Drafts Way Final Draft 87 Item 11. Ramsey Farm Residential Development Figure 2 - 2024 Existing Lane Geometry Legend Existing Laneage S = XX' Storage Length Existing Signal Existing Stop Control Existing Channelization Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road WK Alston Drive S = 175' S = 200'S = 200' S = 175' S = 200' S = 125' S = 250' S = 100' S = 150' S = 275' Ice House Road S = 150' S = 150' S = 125' Drafts Way S = 200' Church Access Final Draft 88 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 5 March 2025 2 Project Traffic 2.1 Trip Generation The trip generation rates, equations, and time of day distribution tables published in the Institute of Transportation Engineers’ (ITE) Trip Generation Manual; 11th Edition were used to estimate the trip generation potential for the development. The analysis was performed using the information for the land use code (LUC) 210 - Single-Family Detached Housing and LUC 215 - Single-Family Attached Housing. The published time of day distributions from ITE were used to develop the School Dismissal peak hour volumes. As shown in Table 1, the development is anticipated to generate 152 (42 In/110 Out) AM peak hour trips, 155 (92 In/63 Out) School Dismissal peak hour trips, and 201 (124 In/77 Out) PM peak hour trips. The estimated trip generation is summarized in Table 1 , and the t rip generation calculations can be found in Appendix B. Table 1 – Trip Generation Summary Land Use Intensity Units Daily AM Peak Hour School Dismissal Peak Hour PM Peak Hour Total In Out Total In Out Total In Out 210 - Single-Family Detached Housing 160 DU 1,555 114 30 84 117 68 49 155 98 57 215 - Single-Family Attached Housing 84 DU 590 38 12 26 38 24 14 46 26 20 Total Net New External Trips 2,145 152 42 110 155 92 63 201 124 77 2.2 Trip Distribution & Assignment New external trips generated by the proposed development were distributed and assigned to the surrounding roadway network based on existing travel patterns, surrounding land uses, and the proposed site layout. The trip distribution percentages used in this analysis are as follows. • 25% to/from the west via Broad River Boulevard • 15% to/from the south via WK Alston Drive • 35% to/from the south via Parris Island Gateway • 10% to/from the west via County Shed Road • 15% to/from the north via Parris Island Gateway The project trip distributions and assignments are illustrated in Figure 3 and Figure 4. Final Draft 89 Item 11. 2 'Int 2'! 5 'Int 5'! 6 'Int 6'! 10 'Int 10'! 3 'Int 3'! 1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'! 39 (26)15 (30) (12) (12) (7) 11 411 4 2 (8) 11(12) 4 (7) (19) 7 (20) 15 (19) 6 (4) 6 11 (8) 6 (4) 4 (12) 8 (24) 15 (20) 9 (24) 17 21 11 17 22 (12) (15) (8) (11) (15) 15 (43) (43) (27) 38 6 (12) 16 17 (12) (19) (19)6 (8) 11 (4) (8) (4) (8) (12) (4) 5 11 4 6(7) 2 6 11 (6) 2 (6) 2 (8) 11 5 (4) 4 (12) 4 2 (8) 11 4 (12) 4 (13) (13) (6) (6)2 (19) 26 Ramsey Farm Residential Development Figure 3 - AM and PM Project Trip Distribution and Assignment Project Site Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road10% 15% 25% 35%15% WK Alston Drive Drafts Way Ice House Road Site Access #1 Site Access #2 Legend xx AM Peak Hour Project Trips (xx) PM Peak Hour Project Trips Entering/Exiting Trip DistributionXX% Church Access Final Draft 90 Item 11. 2 'Int 2'! 5 'Int 5'! 6 'Int 6'! 10 'Int 10'! 3 'Int 3'! 1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'! 14 16 14 3 8 5 79 17 23 96 6 4 10 5 618 16 18 9 13 10 13 32 22 23 32 14 9 9 14 6 3 6 9 35 3 6 5 5 6 3 9 9 5 6 9 9 Ramsey Farm Residential Development Figure 4 - School Dismissal Project Trip Distribution and Assignment Project Site Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road10% 15% 25% 35%15% WK Alston Drive Drafts Way Ice House Road Site Access #1 Site Access #2 Legend xx School Dismissal Peak Hour Project Trips Entering/Exiting Trip DistributionXX% Church Access Final Draft 91 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 8 March 2025 3 Traffic Volume Development The 2024 Existing traffic volumes were utilized in the analysis to develop future-year traffic volumes for the projected 2028 conditions. The future -year volumes consisted of the existing traffic volumes adjusted by an annual growth rate and the anticipated traffic volumes of the proposed development. Worksheets documenting the traffic volume development are provided in Appendix C. 3.1 2024 Existing Traffic Development Peak hour intersection turning movement counts were conducted in the AM peak period (6:00 AM to 9:00 AM), School Dismissal peak period (2:00 PM to 4:00 PM), and PM peak period (4:00 PM to 6:00 PM) on Thursday, November 21st, 2024, at the study area intersections. Figure 5 illustrates the 2024 Existing AM and PM Peak Hour Traffic Volumes and Figure 6 shows the 2024 Existing School Dismissal Peak Hour Traffic Volumes. The raw turning movement count data is included in Appendix D. 3.2 2028 No-Build Traffic Development The development is anticipated to be built and operational by 2028. The future -year traffic volumes consist of the 2024 Existing traffic volumes, grown by a rate of 3% per year and incudes two approved developments to develop the 2028 No-Build traffic volumes. To determine the historical growth rate in the area, traffic count data was obtained from three SCDOT count stations within the study area network. The short-term and long-term growth rates were calculated to be 1.0% and 4.3%, respectively. As such, a 3% annual growth rate was utilized as part of this analysis. The 3% growth rate was approved by Beaufort County during the scoping process. Historic growth rate calculations are provided in Appendix E. Burtonwood Apartments and The Grove at Broad River are two approved residential developments identified within the vicinity of the study area network. The location of the developments and the associated project trip assignments are provided in Appendix F. Figure 7 illustrates the 2028 No-Build AM and PM Peak Hour Traffic Volumes and Figure 8 shows the 2028 No-Build School Dismissal Peak Hour Traffic Volumes. 3.3 2028 Build Traffic Development The anticipated Ramsey Farm Residential Development project traffic volumes were added to the 2028 No-Build traffic volumes to develop 2028 Build traffic volumes. Figure 9 illustrates the 2028 Build AM and PM Peak Hour Traffic Volumes and Figure 10 illustrates the 2028 Build School Dismissal Peak Hour Traffic Volumes. Final Draft 92 Item 11. 2 'Int 2'! 5 'Int 5'! 6 'Int 6'! 3 'Int 3'! 1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'! (64) (868) (2) 0 (249) (83) (0) 0 34 707224 146 68 (245) 269(283) 302 (169) 0 (0) (96) 77 (186) 225 (24) 24 (180) 254 142 (391) 65 (29) 149 (246) (1) 102 (90) 98 (232) 10 (20) 0 (0) 14 16 654 0 0 125 88 147 (15) (13) (994) (0) (16) (126) (89) (72) (202) (21) 41 (28) 66 53 72 (22) (111) 70 118 7 (94) 69 (117) (30) (10) (10) (103) (786) (11) 13 5 (14) 30 41 748(104) 132 89 24 (10) 10 (104) 128 (124) 142 1 (6) 7 17 (32) 72 (156) 115 (175) 2 (3) 74 700 (26) 48 56 (29) 2 (1) (70) (1,028) (4) (78) 31 Ramsey Farm Residential Development Figure 5 - 2024 Existing AM and PM Peak Hour Traffic Volumes Legend xx AM Peak Hour Traffic Volumes (xx) PM Peak Hour Traffic Volumes Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road WK Alston Drive Drafts Way Ice House Road Church Access Final Draft 93 Item 11. 2 'Int 2'! 5 'Int 5'! 6 'Int 6'! 3 'Int 3'! 1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'! 26 31 2 8 16 21 112 129 7 84 854 96 105 22 16 95 101 38 90 10 106 14 6 19 100 776 35 52 42 92 0 64 181 86 91 122 171 18 0 17 17 851 0 0 168 158 261 48 202 40 80 142 25 00 52 860181 212232 Ramsey Farm Residential Development Figure 6 - 2024 Existing School Dismissal Peak Hour Traffic Volumes Legend xx School Dismissal Peak Hour Traffic Volumes Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road WK Alston Drive Drafts Way Ice House Road Church Access Final Draft 94 Item 11. 2 'Int 2'! 5 'Int 5'! 6 'Int 6'! 3 'Int 3'! 1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'! (23) (11) (11) (36) 2 (3) 1 (7)8(12) 46 921 (116) (100) (81) 99 165 115 (101) 174 (448) (108) 87 (332) 345 119 (266) 77 (35) (218) 255 (194) 255 169 78 (283) (97) (27) 27 (307) 325 (1,174) (0) 755 0 0 (1) 0 (0) 0 (0) (212) 313 (0) 0 38 848 0 (72) (1,009) (2) 11 (25) (125) 79 133 (24) 46 (32) 74 60 81 (18) (142) (132) (34) 81 (176) 63 (33) (117) 149 (117) 144 100 27 (140) 160 (11) 11 (926) (5)8 19 (16) 34 (106) 78 (79) (1,239) 83 813 (29) 54(254)147 (95) 35 129 (197)15 6 184 (302) (17) (15) 16 18 2 (1) Ramsey Farm Residential Development Figure 7 - 2028 No-Build AM and PM Peak Hour Traffic Volumes Legend xx AM Peak Hour Traffic Volumes (xx) PM Peak Hour Traffic Volumes Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road WK Alston Drive Ice House Road Drafts Way Church Access Final Draft 95 Item 11. 2 'Int 2'! 5 'Int 5'! 6 'Int 6'! 3 'Int 3'! 1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'! 29 35 2 9 18 24 126 145 8 95 1,004 108 118 25 18 107 114 43 101 11 119 16 7 21 113 921 39 59 47 104 97 102 137 198 20 0 19 19 988 0 0 202 0 90 164 28 192 303 56 243 207 242 74 225268 48 00 59 1,002 Ramsey Farm Residential Development Figure 8 - 2028 No-Build School Dismissal Peak Hour Traffic Volumes Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road WK Alston Drive Drafts Way Ice House Road Legend xx School Dismissal Peak Hour Traffic Volumes Church Access Final Draft 96 Item 11. 2 'Int 2'! 5 'Int 5'! 6 'Int 6'! 10 'Int 10'! 3 'Int 3'! 1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'! (102) (1,021) (2) 0 (295) (104) (0) 0 49 852266 173 80 (315) 336(344) 349 (201) 0 (0) (127) 94 (238) 270 (46) 33 (216) 319 185 (456) 83 (39) 188 (314) (1) 123 (125) 134 (286) 20 (47) 0 (0) 33 39 766 0 0 (1,182) (0) (111) (96) (18) (142) (43) 116 187 (29) (260)149 20 (43) (23) (27) 38 15 (30) (19) (12) 6 14 (12) 16 8 (114) 89 (136) (42) (15) (19) (128) (930) (12) 20 17 (16) 34 50 927(124) 151 106 38 (17) 13 (123) 146 (148) 171 (37) 65 67 (45) 6 (14) 1 (7) 8 19 (36) 86 (180) 133 (209) 2 (3) 87 815 (92) (1,245) (5) (25) (125) (19) 79 133 6 17 (12) 0 (0) (114) 61 39 (26) (24) 46 (0) 0 60 81 15 (32) 74 Ramsey Farm Residential Development Figure 9 - 2028 Build AM and PM Peak Hour Traffic Volumes Legend xx AM Peak Hour Traffic Volumes (xx) PM Peak Hour Traffic Volumes Project Site Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road WK Alston Drive Drafts Way Ice House Road Site Access #1 Site Access #2 Church Access Final Draft 97 Item 11. 2 'Int 2'! 5 'Int 5'! 6 'Int 6'! 10 'Int 10'! 3 'Int 3'! 1 'Int 1'! 7 'Int 7'! 4 'Int 4'! 8 'Int 8'! 112 120 44 11 129 15419 13113 121 31 23 43 101 14 9 155 214 38 0 29 32 994 0 0 104 180 42 195 309 60 253 0 82 1,011213277 65 232 250 79 23 32 23 0 47 104 32 59 0 22 0 106 115 207 39 35 0 9 14 20 21 122 924 11 125 24 8 9 104 1,009 18 Ramsey Farm Residential Development Figure 10 - 2028 Build School Dismissal Peak Hour Traffic Volumes Project Site Parris Island Gateway Jennings Road Ramsey Road Broad River Boulevard County Shed Road WK Alston Drive Drafts Way Ice House Road Site Access #1 Site Access #2 Legend xx School Dismissal Peak Hour Traffic Volumes Church Access Final Draft 98 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 15 March 2025 4 Capacity Analysis Capacity analyses were conducted using the Highway Capacity Manual (HCM) , 6th Edition, methodologies of the Synchro, Version 1 2, traffic analysis software. Capacity analyses were conducted for the AM, School Dismissal, and PM peak hours for the 2024 Existing, 2028 No-Build conditions, 2028 Build, and 2028 Build Improved conditions analysis scenarios. Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational conditions of the intersection traffic flow. LOS A operations typically repr esent ideal, free -flow conditions where vehicles experience little to no delays, and LOS F operations typically represent poor, gridlocked conditions with high vehicular delays, and are generally considered undesirable. Table 2 lists the LOS control delay thresholds published in the HCM for signalized and unsignalized intersections. Table 2 – HCM Level of Service Criteria LOS Control Delay per Vehicle (sec/veh) Signalized Intersections Unsignalized Intersections A ≤ 10 ≤ 10 B > 10 – 20 > 10 – 15 C > 20 – 35 > 15 – 25 D > 35 – 55 > 25 – 35 E > 55 – 80 > 35 – 50 F > 80 > 50 As part of the capacity analysis, SCDOT’s default Synchro parameters were utilized. Existing peak hour factors (PHF) were utilized for the existing and future -year scenarios for the existing intersections part of this study. Proposed intersections were assumed to have a PHF of 0.9 . Existing heavy vehicle percentages were utilized for all scenarios, with a minimum of 2% considered. Unsignalized intersections operating at LOS A-LOS C are considered to operate with short delays, unsignalized intersections operating at LOS D -LOS E are considered to operate with moderate delays, and intersections operating at LOS F are considered to operate with long delays. Please note, this TIA assumes a passenger car length is 25 feet. In the following subsections in the capacity analysis, the queues at unsignalized intersections may be longer on the side streets versus signalized intersections due to limited available gaps for these movements. A traffic signal can allow for shorter queue s on the side streets because the signal forces the mainline to stop, whereas at unsignalized intersections the mainline is not forced to stop to provide gaps to the side streets. The following sections outline the results of the capacity analysis for each of the study intersections. The capacity analysis worksheets are included in Appendix G. Final Draft 99 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 16 March 2025 4.1 Broad River Boulevard at Jennings Road The capacity analysis results for the Broad River Boulevard at Jennings Road intersection are summarized in Table 3. Table 3 – Broad River Boulevard at Jennings Road Capacity Analysis Results Condition Measure Broad River Boulevard Broad River Boulevard Jennings Road EBL EBT WBT WBR SBL SBR AM Peak Hour 2024 Existing LOS (Delay) A (7.7)* A (0.0) C (17.4) Synchro 95th Q 5' 0' 0' 0' 55' 10’ 2028 No-Build LOS (Delay) A (7.8)* A (0.0) C (23.1) Synchro 95th Q 5' 0' 0' 0' 88' 13’ 2028 Build LOS (Delay) A (7.9)* A (0.0) D (29.0) Synchro 95th Q 8' 0' 0' 0' 125' 15’ School Dismissal Peak Hour 2024 Existing LOS (Delay) A (8.2)* A (0.0) C (16.1) Synchro 95th Q 8' 0' 0' 0' 35' 13’ 2028 No-Build LOS (Delay) A (8.4)* A (0.0) C (19.8) Synchro 95th Q 8' 0' 0' 0' 53' 15’ 2028 Build LOS (Delay) A (8.4)* A (0.0) C (23.6) Synchro 95th Q 10' 0' 0' 0' 75' 18’ PM Peak Hour 2024 Existing LOS (Delay) A (8.4)* A (0.0) C (16.6) Synchro 95th Q 8' 0' 0' 0' 28' 13’ 2028 No-Build LOS (Delay) A (8.7)* A (0.0) C (20.4) Synchro 95th Q 8' 0' 0' 0' 43' 15’ 2028 Build LOS (Delay) A (8.8)* A (0.0) C (24.9) Synchro 95th Q 10' 0' 0' 0' 63' 18’ Notes: * - Left turn delay for major street is reported Based on the results presented in Table 3, the analyzed intersection approaches are anticipated to experience short delays in the 2024 Existing and the 2028 No-Build scenarios. With the addition of the development traffic, the intersection approaches are anticipated to continue to operate with short delays during the School Dismissal and PM peak hours but experience moderate delays on the southbound approach in the AM peak hour. During the AM peak hour, the development traffic is anticipated to increase the southbound Synchro 95th percentile queue length by less than two passenger car lengths, when compared to the 2028 No-Build condition. Unsignalized, side street movements operating over capacity are typical during peak hour conditions. No capacity improvements are recommended at this intersection. Final Draft 100 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 17 March 2025 4.2 County Shed Road at Jennings Road The capacity analysis results for the County Shed Road at Jennings Road intersection are summarized in Table 4. Table 4 – County Shed Road at Jennings Road Capacity Analysis Results Condition Measure County Shed Road County Shed Road Jennings Road EBT EBR WBL WBT NBL NBR AM Peak Hour 2024 Existing LOS (Delay) A (0.0) A (8.1)* B (11.6) Synchro 95th Q 0' 0' 5' 0' 15' 3' 2028 No-Build LOS (Delay) A (0.0) A (8.2)* B (12.3) Synchro 95th Q 0' 0' 5' 0' 20' 3' 2028 Build LOS (Delay) A (0.0) A (8.2)* B (12.5) Synchro 95th Q 0' 0' 5' 0' 23' 5' School Dismissal Peak Hour 2024 Existing LOS (Delay) A (0.0) A (7.9)* B (11.9) Synchro 95th Q 0' 0' 3' 0' 23' 3' 2028 No-Build LOS (Delay) A (0.0) A (8.0)* B (12.8) Synchro 95th Q 0' 0' 3' 0' 28' 3' 2028 Build LOS (Delay) A (0.0) A (8.1)* B (13.4) Synchro 95th Q 0' 0' 3' 0' 30' 3' PM Peak Hour 2024 Existing LOS (Delay) A (0.0) A (7.8)* B (11.5) Synchro 95th Q 0' 0' 3' 0' 20' 3' 2028 No-Build LOS (Delay) A (0.0) A (7.8)* B (12.2) Synchro 95th Q 0' 0' 3' 0' 25' 3' 2028 Build LOS (Delay) A (0.0) A (7.9)* B (12.7) Synchro 95th Q 0' 0' 3' 0' 28' 5' Notes: * - Left turn delay for major street is reported Based on the results presented in Table 4, the intersection is anticipated to operate with short delays during the analyzed scenarios. No capacity improvements are recommended at this intersection. Final Draft 101 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 18 March 2025 4.3 Jennings Road at Drafts Way /Site Access #1 The capacity analysis results for the Jennings Road at Drafts Way /Site Access #1 intersection are summarized in Table 5. The site access is analyzed with a single ingress and egress lane and operates as a full-movement stop-controlled approach. Table 5 – Jennings Road at Drafts Way/Site Access #1 Capacity Analysis Results Condition Measure Drafts Way Site Access #1 Jennings Road Jennings Road EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR AM Peak Hour 2024 Existing LOS (Delay) B (12.8) - A (8.1)* A (0.0) Synchro 95th Q 25' 5' 0' 2028 No-Build LOS (Delay) B (13.9) - A (8.3)* A (0.0) Synchro 95th Q 33' 8' 0' 2028 Build LOS (Delay) C (15.4) C (17.6) A (8.3)* A (7.5)* Synchro 95th Q 40' 23' 8' 0' School Dismissal Peak Hour 2024 Existing LOS (Delay) B (12.1) - A (8.0)* A (0.0) Synchro 95th Q 23' 5' 0' 2028 No-Build LOS (Delay) B (13.0) - A (8.1)* A (0.0) Synchro 95th Q 28' 5' 0' 2028 Build LOS (Delay) B (14.8) C (16.3) A (8.1)* A (7.7)* Synchro 95th Q 33' 13' 5' 3' PM Peak Hour 2024 Existing LOS (Delay) B (10.2) - A (7.6)* A (0.0) Synchro 95th Q 8' 0' 0' 2028 No-Build LOS (Delay) B (10.5) - A (7.6)* A (0.0) Synchro 95th Q 8' 0' 0' 2028 Build LOS (Delay) B (11.3) B (12.5) A (7.6)* A (7.7)* Synchro 95th Q 10' 8' 0' 3' Notes: * - Left turn delay for major street is reported Based on the results presented in Table 5, the intersection approaches currently and are anticipated to continue to operate with short delays during the analyzed scenarios . With the construction of Site Access #1 as the westbound approach , the intersection approaches are anticipated to continue to operate with short delays. An auxiliary turn lane warrant analysis was conducted at Site Access #1 for the entering northbound right-turn lane and southbound left-turn lane. SCDOT auxiliary turn lane warrants are not met; therefore, turn lanes into Site Access #1 are not recommended . The turn lane warrant analysis is provided in Appendix H. No capacity improvements are recommended at this intersection. Please note, the capacity analysis contained within this TIA assumes Site Access #1 will align with Drafts Way. The offset intersection will not be allowed by Beaufort County. The concept plan will need to be updated to show Site Access #1 aligning with Drafts Way. Site Access #1 is recommended to operate as full- movement, under minor street stop -control. Site Access #1 is recommended to be constructed with a single ingress and a single egress lane. Final Draft 102 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 19 March 2025 4.4 Broad River Boulevard at Ramsey Road The capacity analysis results for the Broad River Boulevard at Ramsey Road intersection are summarized in Table 6. Table 6 – Broad River Boulevard at Ramsey Road Capacity Analysis Results Condition Measure Broad River Boulevard Broad River Boulevard Ramsey Road EBL EBT WBT WBR SBL SBR AM Peak Hour 2024 Existing LOS (Delay) A (7.6)* A (0.0) B (10.9) Synchro 95th Q 3' 0' 0' 0' 5' 2028 No-Build LOS (Delay) A (7.7)* A (0.0) B (11.6) Synchro 95th Q 3' 0' 0' 0' 5' 2028 Build LOS (Delay) A (7.7)* A (0.0) B (12.6) Synchro 95th Q 3' 0' 0' 0' 13' School Dismissal Peak Hour 2024 Existing LOS (Delay) A (7.8)* A (0.0) B (11.0) Synchro 95th Q 3' 0' 0' 0' 5' 2028 No-Build LOS (Delay) A (7.9)* A (0.0) B (11.8) Synchro 95th Q 3' 0' 0' 0' 5' 2028 Build LOS (Delay) A (8.0)* A (0.0) B (12.9) Synchro 95th Q 3' 0' 0' 0' 10' PM Peak Hour 2024 Existing LOS (Delay) A (8.0)* A (0.0) B (12.3) Synchro 95th Q 3' 0' 0' 0' 5' 2028 No-Build LOS (Delay) A (8.2)* A (0.0) B (13.8) Synchro 95th Q 3' 0' 0' 0' 8' 2028 Build LOS (Delay) A (8.4)* A (0.0) C (16.4) Synchro 95th Q 5' 0' 0' 0' 18' Notes: * - Left turn delay for major street is reported Based on the results presented in Table 6, the intersection is anticipated to operate with short delays during the analyzed scenarios. No capacity improvements are recommended at this intersection. There is a potential cut through route for site traffic from Ramsey Road to Broad River Boulevard via Glaze Drive. However, Glaze Drive is a skewed intersection with Broad River Boulevard and is unsignalized, therefore, it is unlikely site traffic will utilize Glaze Drive as a cut through. After the site is constructed and if cut through traffic is observed along Glaze Drive, the Ramsey Farm Development would be responsible for implementing traffic calming measures per SCDOT and/or Beaufort County guidelines. Final Draft 103 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 20 March 2025 4.5 County Shed Road at Ramsey Road The capacity analysis results for the County Shed Road at Ramsey Road intersection are summarized in Table 7. Table 7 – County Shed Road at Ramsey Road Capacity Analysis Results Condition Measure County Shed Road County Shed Road Ramsey Road EBT EBR WBL WBT NBL NBR AM Peak Hour 2024 Existing LOS (Delay) A (0.0) A (7.6)* B (10.0) Synchro 95th Q 0' 0' 3' 2028 No-Build LOS (Delay) A (0.0) A (7.6)* B (10.3) Synchro 95th Q 0' 0' 3' 2028 Build LOS (Delay) A (0.0) A (7.6)* B (10.3) Synchro 95th Q 0' 0' 5' School Dismissal Peak Hour 2024 Existing LOS (Delay) A (0.0) A (7.6)* B (10.3) Synchro 95th Q 0' 0' 3' 2028 No-Build LOS (Delay) A (0.0) A (7.6)* B (10.6) Synchro 95th Q 0' 0' 5' 2028 Build LOS (Delay) A (0.0) A (7.7)* B (10.8) Synchro 95th Q 0' 0' 5' PM Peak Hour 2024 Existing LOS (Delay) A (0.0) A (7.5)* B (10.0) Synchro 95th Q 0' 0' 3' 2028 No-Build LOS (Delay) A (0.0) A (7.6)* B (10.1) Synchro 95th Q 0' 0' 3' 2028 Build LOS (Delay) A (0.0) A (7.6)* B (10.6) Synchro 95th Q 0' 0' 5' Notes: * - Left turn delay for major street is reported Based on the results presented in Table 7, the intersection is anticipated to operate with short delays during the analyzed scenarios. No capacity improvements are recommended at this intersection. Final Draft 104 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 21 March 2025 4.6 Parris Island Gateway at County Shed Road The capacity analysis results for the Parris Island Gateway at County Shed Road intersection are summarized in Table 8. Table 8 – Parris Island Gateway at County Shed Road Capacity Analysis Results Condition Measure County Shed Road Ice House Road Parris Island Gateway Parris Island Gateway EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR AM Peak Hour 2024 Existing LOS (Delay) E (44.8) C (18.7) A (9.8)* A (9.5)* Synchro 95th Q 53' 60' 0' 5’ 5' 0' 0' 0' 0' 2028 No- Build LOS (Delay) F (111.0) D (26.0) B (10.5)* B (10.3)* Synchro 95th Q 98' 130' 3' 8’ 5' 0' 0' 0' 0' 2028 Build LOS (Delay) F (135.4) D (27.0) B (10.6)* B (10.3)* Synchro 95th Q 130' 143' 3' 8’ 5' 0' 0' 0' 0' School Dismissal Peak Hour 2024 Existing LOS (Delay) F (50.8) F (52.4) B (10.9)* A (9.5)* Synchro 95th Q 43' 78' 18' 18’ 13' 0' 3' 0' 0' 2028 No- Build LOS (Delay) F (154.5) F (150.8) B (12.3)* B (10.2)* Synchro 95th Q 83' 170' 40' 33’ 18' 0' 3' 0' 0' 2028 Build LOS (Delay) F (200.7) F (196.5) B (12.5)* B (10.2)* Synchro 95th Q 105' 188' 45' 38’ 20' 0' 3' 0' 0' PM Peak Hour 2024 Existing LOS (Delay) F (68.2) E (36.5) B (12.2)* A (9.5)* Synchro 95th Q 58' 75' 13' 13’ 15' 0' 0' 0' 0' 2028 No- Build LOS (Delay) F (247.9) F (141.2) B (14.6)* B (10.2)* Synchro 95th Q 98' 185' 40' 23’ 23' 0' 0' 0' 0' 2028 Build LOS (Delay) F ($) F (217.0) C (15.2)* B (10.2)* Synchro 95th Q 128' 210' 43' 25’ 28' 0' 0' 0' 0' Notes: * - Left turn delay for major street is reported $ - Delays exceeds 300 seconds Based on the results presented in Table 8 , the eastbound minor street approach currently operates with moderate delays during the AM peak hour and long delays during the School Dismissal and PM peak hours. Please note, the existing capacity analysis results may have longer delays and queues, as the spillback from the US 21/Boundary Street signal is not calculated in this analysis. In the 2028 No-Build conditions, the minor street approach is anticipated to operate with long delays in the analyzed peak hours. The minor street delay is anticipated to increase from 2028 No-Build to 2028 Build conditions, however, the 95th percentile queue is anticipated to increase by less than two passenger car lengths. Unsignalized, side street movements operating over capacity are typical during peak hour conditions. Please note, this intersection is under study by Beaufort County as part of an overall analysis of the US 21 corridor. The intersection is proposed to operate as a right in/right out along with the realignment of County Shed Road to intersect with US 21. The county does not currently have funding for this project and therefore, the analysis reflects the traffic operations using the existing intersection geometry. The side-street delays and queues are anticipated to decrease once this Final Draft 105 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 22 March 2025 intersection is converted to a right-in/right-out by Beaufort County. Based on the capacity analysis results presented in Table 8, the 2028 No-Build and 2028 Build conditions are anticipated to operate similarly; therefore, no capacity improvements are recommended at this intersection. Final Draft 106 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 23 March 2025 4.7 Broad River Boulevard at WK Alston Drive The capacity analysis results for the Broad River Boulevard at WK Alston Drive intersection are summarized in Table 9. Table 9 – Broad River Boulevard at WK Alston Drive Capacity Analysis Results Condition Measure Broad River Boulevard Broad River Boulevard WK Alston EBT EBR WBL WBT NBL NBR AM Peak Hour 2024 Existing LOS (Delay) A (0.0) A (8.7)* C (18.0) Synchro 95th Q 0' 5' 53' 10' 2028 No-Build LOS (Delay) A (0.0) A (9.1)* C (24.7) Synchro 95th Q 0' 8' 90' 13' 2028 Build LOS (Delay) A (0.0) A (9.2)* D (29.5) Synchro 95th Q 0' 8' 110' 15' 2028 Build Improved LOS (Delay) A (0.0) A (9.2)* C (20.7) Synchro 95th Q 0' 0’ 8' 78' 10' School Dismissal Peak Hour 2024 Existing LOS (Delay) A (0.0) A (8.3)* C (21.9) Synchro 95th Q 0' 5' 98' 10' 2028 No-Build LOS (Delay) A (0.0) A (8.5)* E (35.6) Synchro 95th Q 0' 5' 170' 10' 2028 Build LOS (Delay) A (0.0) A (8.6)* E (48.2) Synchro 95th Q 0' 5’ 215' 13' 2028 Build Improved LOS (Delay) A (0.0) A (8.6)* D (29.6) Synchro 95th Q 0' 0’ 5' 150' 10' PM Peak Hour p2024 Existing LOS (Delay) A (0.0) A (8.3)* C (23.4) Synchro 95th Q 0' 3' 113' 10' 2028 No-Build LOS (Delay) A (0.0) A (8.5)* E (41.0) Synchro 95th Q 0' 3' 203' 15' 2028 Build LOS (Delay) A (0.0) A (8.6)* F (60.3) Synchro 95th Q 0' 3' 265' 15' 2028 Build Improved LOS (Delay) A (0.0) A (8.6)* E (36.5) Synchro 95th Q 0' 0’ 3' 193' 13' Notes: * - Left turn delay for major street is reported Based on the results presented in Table 9 , the northbound minor street approach currently operates with short delays in the 2024 Existing scenario. During the 2028 No-Build conditions, the minor street approach is anticipated to continue to operate with short-to-moderate delays. With the addition of project traffic, the minor street approach is anticipated to operate with long delays during the PM peak hour. A turn lane warrant analysis was conducted at WK Alston Drive for the 2028 No-Build and 2028 Build traffic conditions. SCDOT auxiliary right-turn lane warrants are met in both the 2028 No- Build and 2028 Build conditions; therefore, an eastbound right turn lane is recommended. Based on the capacity analysis results presented in Tab le 9, improvements are needed as a result of the added project trips during the no-build and build conditions. The 2028 Build Improved Final Draft 107 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 24 March 2025 scenario includes an eastbound right-turn lane. With the eastbound right-turn lane in place, the northbound approach of the intersection is anticipated to operate with short-to-moderate delays during the analyzed peak periods. Please note, with the eastbound right-turn lane in place, the 2028 Build Improved delays are anticipated to be less than the 2028 No-Build delays for the analyzed peak hours. Based on the turn lane warrant analysis and the capacity analysis results, an eastbound right- turn lane with 200 feet of full width storage and a 150-foot taper is recommended. 4.8 Parris Island Gateway at Broad River Boulevard/Church Access The capacity analysis results for the Parris Island Gateway at Broad River Boulevard/Church Access intersection are summarized in Table 10. Table 10 – Parris Island Gateway at Broad River Boulevard/Church Access Capacity Analysis Results Condition Measure Broad River Boulevard Church Access Parris Island Gateway Parris Island Gateway Intersection EBL EBR WBL WBT WBR NBL NBT SBT SBR AM Peak Hour 2024 Existing LOS (Delay) B (10.4) A (0.0) A (6.2) A (6.5) A (7.0) Synchro 95th Q 118' 13' 0’ 22' 124' 132' 0' 2028 No- Build LOS (Delay) B (12.0) A (0.0) A (7.7) A (8.0) A (8.5) Synchro 95th Q 158' 14' 0’ 27' 167' 173' 0' 2028 Build LOS (Delay) B (12.4) A (0.0) A (7.9) A (8.2) A (8.8) Synchro 95th Q 161' 18' 0’ 35' 168' 176' 0' School Dismissal Peak Hour 2024 Existing LOS (Delay) B (12.9) A (0.0) A (4.6) A (5.1) A (5.6) Synchro 95th Q 94' 18' 0’ 28' 128' 155' 0' 2028 No- Build LOS (Delay) B (15.5) A (0.0) A (5.5) A (6.0) A (6.7) Synchro 95th Q 115' 20' 0’ 41' 163' 202' 0' 2028 Build LOS (Delay) B (19.8) A (0.0) A (5.7) A (6.0) A (7.3) Synchro 95th Q 184' 31' 0’ 81' 236' 300' 0' PM Peak Hour 2024 Existing LOS (Delay) B (15.1) B (12.9) A (5.4) A (6.2) A (6.8) Synchro 95th Q 110' 26' 0’ 48' 138' 211' 0' 2028 No- Build LOS (Delay) B (19.2) B (15.9) A (6.4) A (8.7) A (9.0) Synchro 95th Q 129' 44' 0’ #83’ 168' 289' 0' 2028 Build LOS (Delay) C (29.9) C (24.5) A (6.8) A (7.4) A (9.7) Synchro 95th Q #246' 58' 0’ #151’ 162' 273' 0' Notes: * - Left turn delay for major street is reported # - 95th percentile volume exceeds capacity; queue may be longer Based on the results presented in Table 10, the intersection is anticipated to operate at LOS A during the analyzed peak hours in the 2024 Existing and 2028 No-Build scenarios. With the addition of site traffic, the intersection is anticipated to continue to operate at LOS A in the 2028 Build scenario. No capacity improvements are recommended at this intersection. Final Draft 108 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 25 March 2025 4.9 Ramsey Road at Site Access #2 The capacity analysis results for the Ramsey Road at Site Access #2 intersection are summarized in Table 11. Table 11 – Ramsey Road at Site Access #2 Capacity Analysis Results Condition Measure Site Access #2 Ramsey Road Ramsey Road EBL EBR NBL NBT SBT SBR AM Peak Hour 2028 Build LOS (Delay) A (8.8) A (7.3)* A (0.0) Synchro 95th Q 5' 0' 0' School Dismissal Peak Hour 2028 Build LOS (Delay) A (8.8) A (7.3)* A (0.0) Synchro 95th Q 3' 3' 0' PM Peak Hour 2028 Build LOS (Delay) A (8.9) A (7.4)* A (0.0) Synchro 95th Q 3' 3' 0' Notes: * - Left turn delay for major street is reported An auxiliary turn lane warrant analysis was conducted at Site Access # 2 for the entering southbound right-turn lane and northbound left-turn lane. SCDOT auxiliary turn lane warrants are not met; therefore, turn lanes into Site Access #2 are not recommended. Site Access #2 is recommended to operate as full-movement, under minor street stop -control. Site Access #2 is recommended to be constructed with a single ingress and a single egress lane. Final Draft 109 Item 11. Ramsey Farm Residential Development Traffic Impact Analysis Page 26 March 2025 5 Conclusion The proposed Ramsey Farm Residential Development is located on Assessor’s Parcel Number R100 028 000 0264 0000 northeast of the Broad River Boulevard at Jennings Road intersection in Beaufort County, South Carolina. The Ramsey Farm Residential Development is anticipated to consist of 160 single family detached units and 84 townhome units. The anticipated project traffic will access the roadway network via two proposed full-movement, stop-controlled intersections. Site Access #1 will align with the existing Jennings Road at Drafts Way intersection. Site Access #2 is located along Ramsey Road, approximately one third of a mile south of County Shed Road. The project is proposed to be constructed and fully occupied by 2028. This study summarizes the results of the traffic analyses during the AM, School Dismissal, and PM peak hours for 2024 Existing, 2028 No-Build, 2028 Build, and 2028 Build Improved conditions at the following study intersections: 1.) Broad River Boulevard at Jennings Road 2.) County Shed Road at Jennings Road 3.) Jennings Road at Drafts Way/Site Access #1 4.) Broad River Boulevard at Ramsey Road 5.) County Shed Road at Ramsey Road 6.) Parris Island Gateway at County Shed Road/Ice House Road 7.) Broad River Boulevard at WK Alston Drive 8.) Parris Island Gateway at Broad River Boulevard/Church Access 9.) Ramsey Road at Site Access #2 Traffic operations were evaluated under 2024 Existing, 2028 No-Build, 2028 Build, and 2028 Build Improved conditions during the AM, School Dismissal, and PM peak hours of travel. With the addition of traffic associated with the proposed development, the following improvements are recommended: Broad River Boulevard at WK Alston Drive · Construct an eastbound right-turn lane with 200 feet of full width storage and a 150-foot taper. o Please note, other nearby developments are contributing to the need for this improvement in the no-build conditions Jennings Road at Drafts Way/Site Access #1 · Please note, the capacity analysis contained within this TIA assumes Site Access #1 will align with Drafts Way. The offset intersection shown in the site plan for Site Access #1, will not be allowed by Beaufort County. The concept plan will need to be updated to show Site Access #1 aligning with Drafts Way. · Site Access #1 is recommended to operate as full-movement, under minor street stop- control with a single ingress and a single egress lane. Ramsey Road at Site Access #2 · Site Access #2 is recommended to operate as full-movement, under minor street stop- control · Site Access #2 is recommended to be constructed with a single ingress and a single egress lane. Final Draft 110 Item 11. 55950342 v4 Prepared By and After Recording Return To: Walter J. Nester, III Burr & Forman LLP 23-B Shelter Cove Lane, Suite 400 Hilton Head Island, SC 29928 Development Agreement For Ramsey Farms Beaufort County, South Carolina _________________________, 2025 111 Item 11. 1 55950342 v4 STATE OF SOUTH CAROLINA ) DEVELOPMENT AGREEMENT ) FOR COUNTY OF BEAUFORT ) RAMSEY FARMS THIS DEVELOPMENT AGREEMENT (“Agreement” or “Development Agreement”) is made and entered as of and on the date last executed by a party (the “Effective Date”), by and between Pulte Home Company, LLC, a Michigan limited liability company authorized to conduct business in South Carolina, its successors and assigns (the “Owner”) and Beaufort County, South Carolina, a political subdivision of the State of South Carolina (“County ” or “Beaufort County”). WHEREAS, the legislature of the State of South Carolina has enacted the “South Carolina Local Government Development Agreement Act” (the “Act”) as set forth in Sections 6-31-10 through 6-31-160 of the South Carolina Code of Laws (1976), as amended; and, WHEREAS, the Act recognizes that “[t]he lack of certainty in the approval of development can result in a waste of economic and land resources, can discourage sound capital improvement planning and financing, can cause the cost of housing and development to escalate, and can discourage commitment to comprehensive planning.” [Section 6-31-10 (B)(1)]; and, WHEREAS, the Act further recognizes that: “[d]evelopment agreements will encourage the vesting of property rights by protecting such rights from the effect of subsequently enacted local legislation or from the effects of changing policies and procedures of local government agencies which may conflict with any term or provision of the Development Agreement or in any way hinder, restrict, or prevent the development of the project. Development Agreements will provide a reasonable certainty as to the lawful requirements that must be met in protecting vested property rights, while maintaining the authority and duty of government to enforce laws and regulations which promote the public safety, health, and general welfare of the citizens of our State.” [Section 6-31-10 (B)(6)]; and, 112 Item 11. 2 55950342 v4 WHEREAS, the Act further authorizes local governments, including county governments, to enter development agreements with land owners to accomplish these and other goals described in Section 6-31-10 of the Act; and, WHEREAS, the land that is subject to this Development Agreement includes one (1) tract of land bearing Beaufort County Tax Map number R100 028 000 0264 0000 consisting of approximately eighty six point one six (86.16) acres as more fully described in Exhibit “A” attached hereto and incorporated by reference (hereinafter referred to as the “Property”); and WHEREAS, the Property is currently zoned Rural [T2R] and is largely undeveloped with the historical uses of portions of the Property including farming of planted pines; and WHEREAS, Owner seeks to rezone the to a Hamlet Plat Type designation of the Place Type Overlay (PTO) described in Section 7.3.50 of the CDC, consisting of T4 Hamlet Center (T4HC) and T3 Hamlet Neighborhood (T3HN) in conformance with the Comprehensive Plan; and WHEREAS, the County’s Comprehensive Plan identifies the Property as within a PTO zone and specifically as a Hamlet Place Type, all as described in the Application for Rezoning for the Property (the “ZMA”) submitted by the Owner; and WHEREAS, development of the Property is depicted on a proposed Regulating Plan (defined below) included with the ZMA and this Agreement and attached hereto as Exhibit “B” and incorporated by reference; and WHEREAS, development of the Property includes streets and roads depicted on the Exhibit “B” Regulating Plan with entrance points from Ramsey Road and Jennings Road. The final location of the access points shall be determined at the time of development plan submittal; and WHEREAS, Owner is the contract purchaser of the Property and desires to provide additional development standards for the Property (the “Project”), all as more particularly described herein, to provide for and achieve the successful development of the Project pursuant to and as shown in Regulating Plan for the Property in accordance with the CDC and this Agreement; and WHEREAS, Owner intends to develop a portion of the Property in coordination with the Beaufort Jasper Housing Trust (“BJHT”) to provide affordable housing to Beaufort County residents; and 113 Item 11. 3 55950342 v4 WHEREAS, the development of the Property results in the imposition of certain impact fees (collectively, and not intending to be limiting, hereinafter “impact fees”) in accordance with applicable Beaufort County ordinances and state law to the extent the development creates new impacts; and WHEREAS, Owner has agreed to the construction of road infrastructure on and adjacent to the Property and the dedication of rights-of-way where such road infrastructure has been or shall be constructed on the Property in partial consideration of credits against any impact fees due to the increase in impacts resulting from the development during the term of this Agreement; and WHEREAS, Beaufort County seeks to protect and preserve the natural environment and to secure for its citizens quality, well planned and designed development and a stable and viable tax base; and WHEREAS, Beaufort County finds the Project is consistent with Beaufort County's comprehensive land use plan and shall further the health, safety, welfare and economic well-being of Beaufort County and its citizens; and WHEREAS, the plan for the Project presents Beaufort County with an exceptional opportunity to secure quality planning and a well-constructed residential, mixed-use development; provides for the enhanced protection of the environment; and strengthens and revitalizes the County’s tax base; and WHEREAS, this Development Agreement is being made and entered between Owner and Beaufort County, under the terms of the Act for the purpose of providing assurances to Owner that it may proceed with its development of the Project under the terms hereof, generally in conformance with the Regulating Plan, without encountering future changes in law which would materially affect the ability to complete the proposed development of the Project pursuant to the Regulating Plan, and for the purpose of providing important protection to the natural environment and long term financial stability and a viable tax base to Beaufort County. NOW THEREFORE, in consideration of the terms and conditions set forth herein, and other good and valuable consideration, including the potential economic benefits to both Beaufort County and Owner by entering this Agreement, and to encourage well planned development by Owner, the receipt and sufficiency of such consideration being hereby acknowledged, Beaufort County and Owner hereby agree as follows: 114 Item 11. 4 55950342 v4 I. INCORPORATION. The above recitals are hereby incorporated into and are made a part of this Agreement, together with the South Carolina General Assembly findings as set forth under Section 6-31-10(B) of the Act. II. DEFINITIONS. As used herein, the following terms mean: “Act” means the South Carolina Local Government Development Agreement Act, as codified in Sections 6-31-10 through 6-31-160 of the Code of Laws of South Carolina (1976), as amended. “County” or “Beaufort County” means the government of Beaufort County, South Carolina, a political subdivision of the State of South Carolina. “DHEC” or “SCDHEC” means the South Carolina Department of Health and Environmental Control. “Developer” means Owner and its successors and/or assigns or lessees of Owner, any of whom undertake Development of all or any portion of the Property or who are assigned Development Rights. “Development” shall have the meaning ascribed to “Development” in Section 10.1.40-D of the CDC. “Development Agreement Ordinance” means all terms and conditions of this Development Agreement and all the attachments thereto, including but not being limited to the Regulating Plan and the ZMA and all narratives, applications, site development, plans, standards, exhibits and applicable ordinances as same may be hereafter adopted or amended by mutual agreement of Beaufort County and Owner. Specifically, it is noted that the adoption of the Development Agreement Ordinance after public hearings shall constitute a properly adopted land use ordinance. To the extent that any provision of the Development Agreement Ordinance may be deemed to be a modification of presently existing Beaufort County law, such modification is hereby approved, ratified and adopted as binding upon the Property and the parties hereto by the approval of this Development Agreement. “Development Fees” means any and all road facilities development impact fees incurred in connection with the Development of all or any portion of the Property, whether or not such road facilities or system improvements are currently identified in the County’s adopted road capital improvement plans or other adopted plans, and/or any other similar fee now existing or hereinafter adopted by Beaufort County. 115 Item 11. 5 55950342 v4 “Development Rights” means the vested land use and the rights for the Development of the Property or portions thereof, to be undertaken by Owner in accordance with the Development Agreement Ordinance and the Regulating Plan. “Effective Date” means the date of complete execution of this Agreement after the approval by the County of the Development Agreement Ordinance. “Community Development Code of Beaufort County” or “CDC” means the Development Code of Beaufort County last modified ___________________, and as existing as of the Effective Date. References in the CDC to the latest version of County manuals shall mean and refer to the latest version of such manual as of the Effective Date of this Agreement, and shall include any and all zoning ordinances subsequently adopted or approved by Beaufort County. “Ramsey Farms” means the Project. “Lot” or “Lots” means a parcel or parcels of land depicted in a subdivision plat for all or portions of the Property prepared in conformance with the Regulating Plan, this Development Agreement or a development plan approved by the County. “Owner” means Pulte Home Company, LLC a Michigan limited partnership and its successors, successors in interest, assigns and or any other person, organization or company holding title to all or a portion of the Property. “Parcel” means the Property. “Place Type Overlay” or “PTO” means the proposed zoning for the Property as described in the Application for a Zoning Map Amendment submitted by the Owner concurrent with this Development Agreement. The PTO is described in Section 7.3.50 of the CDC. “Project” means the Development of the Property as contemplated in this Development Agreement and the Regulating Plan. “Property” means the tract of land depicted and legally described on Exhibits “A” attached hereto and made a part hereof. “Regulating Plan” means that certain site plan for the Property prepared by J.K. Tiller Associates, Inc. dated September 5, 2024, and related material and exhibits, depicting proposed parcels and other infrastructure for the Property’s proposed development and which constitute vested Development Rights (as 116 Item 11. 6 55950342 v4 hereinafter defined) under this Agreement and the Act with respect to all applicable zoning and land development requirements under the County Land Development Regulations and the CDC, and which have been reviewed and approved by the County in conjunction with the approval of this Development Agreement, which Regulating Plan is attached hereto as Exhibit “B” and made a part hereof. The Regulating Plan depicts the individual Parcels and describes the development rights for each Parcel on the Property. Development of the Property shall generally be in conformance with the Regulating Plan but the Applicant reserves the right to revise based on site, development and economic conditions during the Term of this Agreement. “Traffic Impact Analysis” or “TIA” means “Term” means a period of five (5) years and two (2) additional five (5) year Terms, if extended as set forth in S.C. Code Section 6-31-40 and Article III of this Agreement. “ZMA” or “Zoning Map Amendment” means the application for the rezoning of the Property submitted by the Owner concurrent with and intending to be approved together with this Development Agreement. III. TERM. The Term of this Agreement shall commence on the Effective Date and terminate five (5) years thereafter; provided that the Term shall without notice from any Party be renewed for up to two (2) additional periods of five (5) years each (each a “Renewal Term”) unless the County delivers written notice to the Owner at least ninety (90), and no more than one hundred eighty (180), days prior to the expiration of the then-current Term or Renewal Term of its good faith basis objection to the renewal and the reasonable action(s) necessary to be taken to renew (an “Objection Notice”), or unless the Owner or its assignee delivers written notice to Beaufort County not less than ninety (90) days prior to the expiration of the then- current Term or Renewal Term, as applicable, of its intent to terminate this Agreement. In the event that the County delivers an Objection Notice as set forth herein, Owner shall have no less than ninety (90) days to cure such objection, and provided that so long as Owner is diligently proceeding to cure the objection, Owner shall be entitled to extensions of time as reasonably necessary to effect such cure. During such cure period the Term shall continue and upon completion of such cure the Renewal Term will commence. During the Term, the provisions of this Development Agreement shall be vested against any future changes to applicable Beaufort County land development regulations and law or ordinances which would affect the ability of Owner to carry out the development approved in this Development Agreement. Further, at the end of the five (5) year period, the provisions of this Development Agreement shall be vested against any applicable future changes to 117 Item 11. 7 55950342 v4 Beaufort County law or ordinances if Owner shall have achieved Substantial Development. “Substantial Development” shall mean the construction of at least (For Discussion) single or multifamily units. The foregoing obligation to achieve Substantial Development within five (5) years shall be tolled during any period of Force Majeure. IV. DEVELOPMENT OF THE PROPERTY. A. The Property shall be developed in accordance with this Development Agreement, the Regulating Plan, and as described in the ZMA. Except as otherwise set forth herein Development of the Property shall be in accordance with consistent with the PTO as set forth in the CDC as of the date hereof. B. Beaufort County agrees that Owner shall develop the Project in phases in accordance with the Development Schedule (as hereinafter defined). C. To the extent allowed by applicable law, Owner may submit these items for concurrent review by Beaufort County and other governmental authorities. V. CHANGES TO THE CDC. Any amendment or modification to the CDC, including any new or successor zoning and development standards ordinances adopted by Beaufort County, shall not be applicable to the Property without the express prior written consent of Owner and any Developer; provided, however, that the subsequently adopted laws and/or ordinances will apply to the Property if enacted pursuant to all proper procedures set forth in applicable statutes and ordinances, including but not limited to requisite notices, required hearings and making required findings that : (a) the amendments or modifications are not in conflict with laws governing this Agreement and do not prevent the Development approved in this Agreement; (b) the amendments or modifications are essential to public health, safety or welfare, and the subsequently adopted laws and/or ordinances expressly state that they apply to the Development of the Property; (c) the amendments or modifications are specifically anticipated and provided for in the Development Agreement; (d) the County has demonstrated that substantial changes have occurred to pertinent conditions regarding the Property existing as of the Effective Date and if not addressed by the County would pose a serious health risk to the public health, safety and welfare of its citizens; or (e) the Development Agreement is based on substantially inaccurate information supplied by Owner. If the CDC or any new or successor zoning and development standards ordinances are adopted by Beaufort County after the date of this Agreement that would materially adversely affect Developer’s right to use the Property as set forth in this Agreement or the 118 Item 11. 8 55950342 v4 Regulating Plan, or that would appreciably increase Developer’s cost to use the Property, such provisions shall not apply with respect to the Property. Owner does, for itself and its successors and assigns, and notwithstanding the CDC, agree to be bound by the following: A. Owner shall be required to notify Beaufort County, in writing, as and when all or a portion of the Development Rights granted or created by this Agreement are transferred to any Developer. Such information shall include the identity and address of the Transferee (as hereinafter defined), a proper contact individual, and the location and number of acres of the Property for which Development Rights are being transferred. Developers transferring Development Rights to any other party shall be subject to this requirement of notification, and any entity acquiring Development Rights hereunder shall be subject to the requirements of Article XVIIG. B. Owner agrees that all Development on the Property, with the exception of irrigation and incidental maintenance facilities, shall be served by potable water and sewer prior to occupancy, except for temporary use. Wells for potable water and septic facilities for sewer will be permitted and constructed in accordance with applicable DHEC standards. VI. DEVELOPMENT SCHEDULE. The Project shall be developed in accordance with the development schedule, attached hereto as Exhibit “C” and made a part hereof (the “Development Schedule ”), as the same may be modified or amended by Owner or any Developer(s) in the future to reflect market conditions as determined in the sole discretion of Owner or any Developer with respect to assigned Development Rights. The Property is intended to be developed in multiple phases based on economic and sales and development conditions. In accordance with the Act, the failure of Owner or any Developer with assigned Development Rights to meet the Development Schedule shall not, in and of itself, constitute a material breach of this Agreement. The failure to meet the Development Schedule shall be judged by the totality of circumstances, including but not limited to Owner's and/or Developer’s good faith efforts to attain compliance with the Development Schedule, matters Force Majeure and similar events. The fact that Development of the Property may take place at a different pace, based on future market conditions, as determined in the sole reasonable discretion of Owner or any Developer with respect to assigned Development Rights, is expected and shall not be a default hereunder. Furthermore, periodic adjustments to the Development Schedule, which may be submitted to the County by Owner or Developer(s) in the future, shall not be considered a major or material amendment or breach of this Agreement. 119 Item 11. 9 55950342 v4 VII. DENSITY AND USE. Beaufort County and the Owner agree that the Property may be developed with uses and densities set forth in the Regulating Plan and described in the ZMA. All types of residential uses allowed in the PTO described in the ZMA are permitted for purposes of this conversion. VIII. ACCESS, TRAFFIC, SYSTEM IMPROVEMENTS, CREDITS AND CONTRIBUTIONS. In addition to all other covenants, conditions and agreements set forth in this Agreement, the following are hereby agreed upon by the parties: A. Access. All public roads outside the Property that serve the Property with the exception of Jennings Road, which is owned by the Beaufort County School Board, are owned and maintained by the South Carolina Department of Transportation (“ SCDOT”) and all ordinances, codes and regulations of the State of South Carolina and Beaufort County, as applicable, regarding access and use of such public roads shall apply. The roads and alleyways within the Property will be private roads. Further, except for Jennings Road, the County shall not be responsible for construction or maintenance of the public roads which now or hereafter serve the Property, unless otherwise agreed by the County in writing. The County's acceptance of any proffered dedication of a road as a public road shall be subject to compliance with the County's procedures for dedication and road acceptance, as such may be adopted and revised from time to time by the County. B. System Improvements . Additional public roads within or serving the Property may be planned in the future, subject to written agreement between the affected Owners and the County. The affected Owners shall have the right to design and construct, upon obtaining permits from applicable governmental authorities, roadways designated at the development plan stage, provided such design is in conformance with and capable of absorbing the traffic loading created by the Development within an approved development plan within the Property. To the extent practical, Owners will utilize construction access points and temporary construction roads to minimize the use by construction vehicles and construction supply trucks of the public roads to be constructed, to avoid undue wear and tear. Access points must meet the requirements of the SCDOT and the County and will be based upon Traffic Impact Analysis during the development plan approval for specific areas or phases of the Property. 120 Item 11. 10 55950342 v4 C. Credits and Contributions. 1. Dedications. The County's acceptance of any proffered dedication of a road as a public road shall be subject to compliance with the County's procedures for dedication and road acceptance, as such may be adopted and revised from time to time by the County. 2. No Other Dedications or Conveyances . Except with respect to the dedications and/or conveyances of the properties referred to in this Article VIII, no other dedications or conveyances of lands for public facilities shall be required in connection with the development of the property. 3. Development Fees. (i) Beaufort County acknowledges that in partial consideration of the cost of the Road Facilities Improvements thereon as described in Article VIII herein (collectively herein the “ System Improvements ”) and notwithstanding any provision to the contrary contained within this Agreement, Owner shall receive a credit against the cost of any and all Development Fees up to the total value of the System Improvements. (ii) Beaufort County or other governing body shall not be precluded by this Agreement from charging fees for delivery of services to citizens or residents (i.e., an EMS response fee or the like), nor from charging fees statutorily authorized in the future (i.e., a real estate transfer fee or the like) which are not collected as a prerequisite to approval of a plat, plan or construction permit and not otherwise contemplated hereunder. (iii) The Development Fees are vested for the entire Property and no other Development Fee or obligation regarding Development is imposed in connection with the Property. IX. EFFECT OF FUTURE LAWS. Owner and Developer(s) shall have vested rights to undertake Development of any portion or all of the Property in accordance with the Development Agreement Ordinance. Future enactments of, or changes or amendments to Beaufort County ordinances, including the CDC, shall not apply to the Property unless the 121 Item 11. 11 55950342 v4 same are adopted in accordance with Article V of this Development Agreement or unless Owner and any Developer(s) consent to such enactment, change or amendment. Beaufort County agrees that the Regulating Plan for the Project and ZMA have been approved and Owner’s rights to develop the Property in accordance with this Development Agreement are fully vested with regard to intensity, density, Development Fees, uses, height, restrictions, setbacks, parking and signage as set forth in the Regulating Plan and the Development Agreement Ordinance, and Owner shall not have any obligations to Beaufort County for on or off site transportation or other facilities or improvements other than as specifically provided in this Agreement and its related documents such as the Development Agreement Ordinance. Beaufort County shall not impose additional development obligations or regulations in connection with the ownership or development of the Property, except in accordance with the procedures and provisions of § 6-31-80 (B) of the Act, which the Owner shall have the right to challenge. The parties specifically acknowledge that this Agreement shall not prohibit the application of any present standard building, housing, electrical, plumbing or gas codes or future codes in compliance with Section 6-31-160 of the Act, or any tax or fee of general application throughout Beaufort County. No future development and/or aid to construction, impact fees or Property- specific special assessments imposed by Beaufort County shall apply to the Property or the Project without the consent of the Owner. X. INFRASTRUCTURE AND SERVICES. Beaufort County and Owner recognize that the majority of the direct costs associated with the development of the Property will be borne by Owner with respect to their respective portions thereof but that other necessary services for landowners and residents within the Property shall be provided by other governmental or quasi -governmental entities, and not by Beaufort County. For clarification, the parties acknowledge the following: A. Private Roads . Any roads proposed to be constructed within the Property shall be constructed by Owner and/or Developers, and dedicated for maintenance to other appropriate entities such as a property or homeowners association formed for all or portions of the Property. Beaufort County shall not be responsible for the construction or maintenance of any roads within the Property, unless the County specifically agrees to do so in the future. B. Public Roads. (i) The Property shall be served by direct access from Jennings Road and Ramsey Road as shown on the Regulating Plan. 122 Item 11. 12 55950342 v4 (ii) The location of public access points to the Property, median cuts in the right-of-way, and signage shall be as set forth in the Regulating Plan or any revisions thereto at the time of any development plan review for any Phase of the Property by the County. C. Potable Water . Owner and/or Developers, to the extent necessary and not currently existing, may construct or cause to be constructed all necessary water service infrastructure within the Property at Owner’s and/or Developer’s cost, which infrastructure shall be owned and maintained by Owner or Beaufort Jasper Water and Sewer Authority (“BJWSA”) and may be conveyed to BJWSA as may be required by BJWSA. D. Sewage Treatment and Disposal . Sewage treatment and disposal may be provided by BJWSA. Owner and/or Developers, to the extent necessary and not currently existing, shall construct or cause to be constructed all necessary sanitary sewer service infrastructure within the Property at Owner’s and/or Developer’s cost, which infrastructure shall be owned and maintained by Owner or BJWSA and may be conveyed to BJWSA as may be required by BJWSA. Septic facilities for sewer shall be authorized for the PTO subject to applicable DHEC regulations and permitting. E. Stormwater Treatment and Disposal . Stormwater treatment and disposal shall be in accordance with the applicable law and regulations existing as of the date of this Agreement. F. Public Financing. Owner (for itself or in concert with other Developers or interested parties) reserves the right to engage in joint planning and financing of public infrastructure for the mutual benefit of the County and Owner. The details of such public infrastructure may be included in the ZMA, this Development Agreement or other agreement as mutually agreed to by the County and Owner. G. Other Services / Future Agreements. Development within the Property shall be served and entitled to any and all Beaufort County services, such as fire protection and police protection, provided to other property within the County, with the understanding that the Property, except as otherwise herein provided, shall be subject to all Beaufort County taxes of universal application, as well as any special service district taxes which may apply to all other existing properties and development within the area. Normal and customary County services shall be provided to owners and residents within the Property on the same basis as all other property in Beaufort County. 123 Item 11. 13 55950342 v4 XI. DEVELOPMENT STANDARDS. Development standards for the Project shall be as set forth in the Regulating Plan, the ZMA and this Agreement. A. Criteria for approval. Section 7-3-40 of the CDC sets forth the criteria for approval of an amendment to the Beaufort County Zoning Map. No petition to change the text of the CDC or Zoning Map applicable to the Property shall succeed except: (i) Where necessary to implement the land use plan update; (ii) To correct an original mistake or a manifest error in the regulations or map; (iii) To recognize substantial change or changing conditions or circumstances in a particular locality; or (iv) To recognize changes in technology, the style of living, or the manner of doing business. Owners may apply for variances to the Zoning Map through the application process set forth in the CDC from time to time and those applications are not governed by this Agreement or any document under the Development Agreement Ordinance. B. Use Restrictions. Upon approval of this Agreement and prior to the approval of any development on the Property the Owner shall record restrictive land use covenants concerning certain uses on all or portions of the Property. These restrictions shall be covenants running with the land and title thereto enforceable by any owner, the County or any property owner association to be formed to manage the Property or portions thereof. (i) Workforce Housing: 10 single family units within the Property shall be developed for workforce housing and capped at 80-120% of area median income. 124 Item 11. 14 55950342 v4 (ii) Restrictive Covenants. Property subject to the workforce housing requirement will be conveyed subject to restrictions as described in Exhibit “D” attached hereto and incorporated herein. (iii) First Time Homebuyer Credit. Property subject to the workforce housing requirement will also require a closing credit/down payment assistance be applied to first time homebuyers in the amount of up to $2,500.00. This credit shall be paid in coordination with BJHT. BJHT shall screen all first time homebuyers to ensure compliance with the criteria for workforce housing. (iv) Rehabilitation Fees . Developer agrees to provide up to $750.00 per unit towards rehabilitation of existing local structures in the vicinity of the development. Rehabilitation fees shall be paid to BJHT by the Developer upon issuance of a building permit. XII. OWNER ENTITLEMENTS, VESTED RIGHTS. NOTE: FOR DISCUSSION Beaufort County acknowledges that Owner is vested with the following approvals: A. Development Standards. Subject to the terms and conditions of this Agreement, Beaufort County agrees that the Property is vested with the various rights set forth in this Agreement, the ZMA and the Regulating Plan, and that the density, uses, buffers, access and all other matters shown and described therein and in this Agreement, are approved. B. Approved Variances from the CDC. (i) Architectural Standards. (1) T4HC: Approved architectural standards for the T4HC portions of the Property shall comply with the “XXXX” standards described in Exhibit “E” attached hereto and incorporated herein; (2) T3HC: Approved architectural standards for the T3HC portions of the Property shall comply with the following standards: “XXXX” attached hereto as Exhibit “F-1”, “XXXX” attached hereto as Exhibit “F-2”, “XXXX” attached hereto as Exhibit “F-3”, “XXXX” attached hereto as Exhibit “F-4”, “XXXX” attached hereto as Exhibit “F-5”, and “XXXX” attached hereto as Exhibit “F-6”. (ii) Back Streets. 125 Item 11. 15 55950342 v4 C. Access. Beaufort County hereby approves the location of points of access to the Property as shown in the Regulating Plan, subject to SCDOT permitting and approval, if any. D. Other Services. Beaufort County services, including, but not limited to, police, fire, and other governmental services shall be supplied to the Property in the same manner and to the same extent as provided to other properties within Beaufort County. In the event Owner requires enhanced services beyond those which are routinely provided within Beaufort County, Beaufort County agrees that upon the written request of Owner, it shall negotiate in good faith with Owner to provide such enhanced services to the Property. D. Vested Rights. Beaufort County agrees that the Property is approved and fully vested for intensity, commercial density, Development Fees, uses and height, setbacks, parking and signage as set forth in the Development Plan and the Development Agreement Ordinance, and shall not have any obligations for on or off site transportation or other facilities or improvements other than as specifically provided in this Agreement, but shall adhere to the Regulating Plan. Beaufort County shall not impose additional development obligations or regulations in connection with the ownership or development of the Property, except in accordance with the procedures and provisions of § 6-31-80 (B) of the Act, which Owner shall have the right to challenge. XIII. DEFAULTS. The failure of Owner, the Developer or Beaufort County to comply with the terms of this Agreement shall constitute a default, entitling the non-defaulting party to pursue such remedies as deemed appropriate, including specific performance and the termination of this Development Agreement in accordance with the Act; provided however no termination of this Development Agreement may be declared by Beaufort County absent affording Owner and any applicable Developer the notice, hearing and opportunity to cure in accordance with the Act; and provided further that nothing herein shall be deemed or construed to preclude Beaufort County or its designee from issuing stop work orders or voiding permits issued for Development when such Development contravenes the provisions of the Development Agreement Ordinance. Owner, or its designee, shall meet with Beaufort County’s Planning Director and Economic Development Director, at least once per year, at a time reasonably agreeable to the parties, during the Term of this Agre ement to review development completed in the prior year and the development anticipated to be commenced or completed in the ensuing year. Owner, or its designee, shall be required to provide such information as may reasonably be requested, to include, but not be limited to, commercial square footage completed, residential dwelling units 126 Item 11. 16 55950342 v4 completed, and any relevant information regarding the Development. This compliance review shall be in addition to, and not in lieu of, any other reporting or filing required by this Agreement, if any. If, as a result of a compliance review, Beaufort County determines that Owner has committed a material breach of the terms of this Development Agreement, Beaufort County shall serve such party in writing notice of such breach pursuant to the procedures set forth in Section 6 -31-90 (B) of the Act, affording the breaching party the opportunity to respond as set forth in Section 6-31-90 (C) of said Act. XIV. MODIFICATION OF AGREEMENT. This Development Agreement may be modified or amended only by the written agreement of Beaufort County and Owner and Developer, as applicable pursuant to the requirements for amendments to development agreements. No statement, action or agreement hereafter made shall be effective to change, amend, waive, modify, discharge, terminate or effect an abandonment of this Agreement in whole or in part unless such statement, action or agreement is in writing and signed by the party against whom such change, amendment, waiver, modification, discharge, termination or abandonment is sought to be enforced. XV. NOTICES. Any notice, demand, request, consent, approval or communication which a signatory party is required to or may give to another signatory party hereunder shall be in writing and shall be delivered or addressed to the other at the address below set forth or to such other address as such party may from time to time direct by written notice given in the manner herein prescribed, and such notice or communication shall be deemed to have been given or made when received if delivered by personal delivery or by independent courier service or if by mail on the third (3rd) business day after the deposit thereof in the United States Mail, postage prepaid, registered or certified, addressed as hereinafter provided or the next business day if sent by recognized natural overnight courier such as FedEx. All notices, demands, requests, consents, approvals or communications shall be addressed as follows: To Beaufort County: Office of Beaufort County Administrator c/o County Administrator Beaufort County Administration Building 100 Ribaut Road Beaufort, SC 29902 With Copy To: Beaufort County Legal Department c/o County Attorney 102 Industrial Village, Bldg. 2 Beaufort, SC 29901 127 Item 11. 17 55950342 v4 And to Owner: Pulte Home Company, LLC c/o PulteGroup Inc. Attn: Graham Hawkins 4401 Leeds Avenue, Suite 400 North Charleston, SC 29405 With Copy To: Walter J. Nester, III Burr & Forman LLP 23-B Shelter Cove Lane, Suite 400 Hilton Head Island, SC 29928 XVI. ENFORCEMENT. Any party hereto shall have the right to enforce the terms, provisions and conditions of the Agreement by any remedies available at law or in equity, including specific performance. XVII. GENERAL. A. Subsequent Laws. In the event state or federal laws or regulations are enacted after the execution of this Development Agreement or decisions are issued by a court of competent jurisdiction which prevent or preclude compliance with the Act or one or more provisions of this Agreement (“New Laws ”), the provisions of this Agreement shall be modified or suspended as may be necessary to comply with such New Laws. Immediately after enactment of any such New Laws, or court decision, Owner and any Developer (with respect to assigned rights) and Beaufort County shall meet and confer in good faith in order to agree upon such modification or suspension based on the effect such New Laws would have on the purposes and intent of this Agreement. During the time that these parties are conferring on such modification or suspension or challenging the New Laws, Beaufort County may take reasonable action to comply with such New Laws. Should these parties be unable to agree to a modification or suspension, either party may petition a court of competent jurisdiction for an appropriate modification or suspension of this Agreement. In addition, Owner and any Developer with respect to assigned rights, and Beaufort County each shall have the right to challenge the New Laws preventing compliance with the terms of this Agreement. In the event that such challenge is successful, this Agreement shall remain unmodified and in full force and effect. B. Estoppel Certificate. Beaufort County and Owner may, at any time, and from time to time, deliver written notice to the other applicable party requesting such party to certify in writing: 128 Item 11. 18 55950342 v4 (i) that this Agreement is in full force and effect, (ii) that this Agreement has not been amended or modified, or if so amended, identifying the amendments, (iii) whether, to the knowledge of such party, the requesting party is in default or claimed default in the performance of its obligations under this Agreement, and, if so, describing the nature and amount, if any, of any such default or claimed default, and (iv) whether, to the knowledge of such party, any event has occurred or failed to occur which, with the passage of time or the giving of notice, or both, would constitute a default and, if so, specifying each such event. C. Entire Agreement. This Agreement sets forth, and incorporates by reference all of the agreements, conditions and understandings between Beaufort County and Owner relative to the Property and its Development and there are no promises, agreements, conditions or understandings, oral or written, expressed or implied, among these parties relative to the matters addressed herein other than as set forth or as referred to herein. D. No Partnership or Joint Venture. Nothing in this Agreement shall be deemed to create a partnership or joint venture between Beaufort County and Owner or to render such party liable in any manner for the debts or obligations of another party. E. Exhibits. All exhibits attached hereto and/or referred to in this Agreement are incorporated herein as though set forth in full. F. Successors and Assigns. (i) Binding Effect. This Agreement shall be binding upon Owner’s successors and assigns in the ownership or Development of any portion of the Property. Except for Owner’s continuing obligation as specifically stated in Article XVIIG(ii)(1) and (G)(iii) below, a purchaser or a party acquiring title to any portion of the Property or a party to whom Owner assigns Development Rights with respect to any portion of the Property (herein collectively referred to as a “ Transferee”) shall, during the Term of this Agreement, be solely responsible for the performance of Owner’s obligations and entitled to the assigned Development Rights under this Development Agreement applicable to the portion of the Property transferred, or for which 129 Item 11. 19 55950342 v4 Development Rights are transferred. Each Transferee shall be required to execute a written acknowledgement assuming Owner’s obligations under this Agreement, which are directly applicable to such portion of the Property. Such acknowledgment shall be in the form provided in Exhibit “G” attached hereto and made a part hereof (the “ Notice of Transfer ”), and provided to Beaufort County at the time of recording any instrument transferring title, and development rights, of the Property or any portion of the Property. This Section shall not be construed to prevent Owner from obtaining indemnification of liability to Beaufort County from Transferees. Except as specifically set forth in Article XVIII G (ii)(1) and G (iii) below, and in accordance with applicable law, upon transfer to a Transferee, Owner shall be released of all obligations assumed by such Transferee as to such portion of the Property. (ii) Transfer of all of the Property . Owner shall be entitled to transfer all or any portion of the Property to a Transferee subject to the following requirements: (1) Notification to County. When Owner transfers all or any portion of the Property to a Transferee, Owner shall be responsible for delivering, or causing to be delivered, to Beaufort County the Notice of Transfer together with the name, address, telephone number, e -mail address and contact person for the Transferee. (2) Assignment of Development Rights. Any and all conveyances of all or any portion of the Property to a Transferee shall be by a recordable instrument with a covenant running with the land expressly stating the precise amount of density assigned to the Transferee, in a form similar to Exhibit “G” attached hereto and incorporated herein. (iii) Mortgage Lenders. Notwithstanding anything to the contrary contained herein, the requirements to transfer contained in this Article XVIII(G) concerning successors and assigns shall apply: (i) to any mortgage lender upon acquiring title to the Property or any portion thereof, either as a result of foreclosure of mortgage secured by any portion of the Property or to any other transfer in lieu of foreclosure; (ii) to any third-party purchaser at such foreclosure; or (iii) to any third-party purchaser of such mortgage lender’s interest subsequent to the mortgage lender’s acquiring 130 Item 11. 20 55950342 v4 ownership of any portion of the Property. Nothing contained herein shall prevent, hinder, or delay any transfer of any portion of the Property to any such mortgage lender or subsequent purchaser. G. Assignment. Subject to the terms hereof, Owner may assign its rights and responsibilities hereunder to subsequent land owners and Developers. H. Governing Law. This Agreement shall be governed by the laws of the State of South Carolina. I. Counterparts. This Agreement may be executed in several counterparts, each of which shall be deemed an original, and such counterparts shall constitute but one and the same instrument. J. Eminent Domain. Nothing contained in this Agreement shall limit, impair or restrict Beaufort County's right and power of eminent domain under the laws of the State of South Carolina. K. No Third Party Beneficiaries. The provisions of this Agreement may be enforced only by Beaufort County, Owner and Developers. No other persons shall have any rights hereunder. L. Attorneys’ Fees and Costs. Each party to this Agreement agrees to pay their own fees and costs incurred by them. XVIII. STATEMENT OF REQUIRED PROVISIONS. A. Specific Statements. The Act requires that a development agreement must include certain mandatory provisions, pursuant to Section 6-31-60 (A). Although certain of these items are addressed elsewhere in this Agreement, the following listing of the required provisions is set forth for convenient reference. The numbering below corresponds to the numbering utilized under Section 6-31-60 (A) for the required items: (i) Legal Description of Property. The legal description of the Property is set forth in Exhibit “A” attached hereto and made a part hereof. (ii) Duration of Agreement. The duration of this Agreement is five (5) years. 131 Item 11. 21 55950342 v4 (iii) Permitted Uses, Densities, Building Heights and Intensities. A complete listing and description of permitted uses, population densities, building intensities and heights, as well as other development -related standards, are contained in the Development Agreement Ordinance. (iv) Required Public Facilities . The utility services that will be available to the Property are described in Article X. The mandatory procedures of the Development Agreement Ordinance will ensure availability of public access and utilities to serve the Property. (v) Local Development Permits. The Development standards for the Property shall be as set forth in the Development Agreement Ordinance. Specific permits must be obtained prior to commencing Development, consistent with the standards set forth in the Development Agreement Ordinance. Building Permits must be obtained under applicable law for any construction. It is specifically understood that the failure of this Agreement to address a particular permit, condition, term or restriction does not relieve Owner or its successors and assigns of the necessity of complying with the law governing the permitting requirements, conditions, terms or restrictions, unless otherwise provided in the Development Agreement Ordinance. (vi) Comprehensive Plan and Development Agreement. Beaufort County agrees that the Development permitted and proposed under the Development Agreement Ordinance is consistent with the Comprehensive Plan and with the development regulations of Beaufort County, South Carolina, in effect as of the date of this Agreement. (vii) Terms for Public Health, Safety and Welfare. The Council for Beaufort County finds that all issues relating to public health, safety and welfare have been adequately considered and appropriately addressed under the terms of the Development Agreement Ordinance and existing laws. (viii) Historical Structures. No historical structures or features are present on the Property and therefore no specific terms relating to historical structures are pertinent to this Development Agreement. [Signatures on following pages] 132 Item 11. 55950342 v4 IN WITNESS WHEREOF, the parties hereby set their hands and seals, effective as of the Effective Date. WITNESSES: OWNER: PULTE HOME COMPANY, LLC a Michigan limited liability company authorized to conduct business in South Carolina _____________________________ ___________________________________ By: _____________________________ Its: STATE OF ) ) ACKNOWLEDGMENT COUNTY OF ) I HEREBY CERTIFY, that on this ____ day of ___________, 20___, before me, the undersigned Notary Public of the State and County stated below, personally appeared known to me (or satisfactorily proven) to be the person whose name is subscribed to the within document, who acknowledged the due execution of the foregoing document in the capacity indicated. IN WITNESS WHEREOF, I have hereunto set my hand and official seal the day and year last above mentioned. ___________________________________ Notary Public for My Commission Expires: ____________ (Affix Notary Seal) 133 Item 11. 55950342 v4 WITNESSES: BEAUFORT COUNTY, SOUTH CAROLINA _____________________________ ___________________________________ By: _____________________________ Its: STATE OF SOUTH CAROLINA. ) ) ACKNOWLEDGMENT COUNTY OF BEAUFORT ) I HEREBY CERTIFY , that on this ____ day of ______________, 20___, before me, the undersigned Notary Public of the State and County aforesaid, personally appeared ___________________________, known to me (or satisfactorily proven) to be the person whose name is subscribed to the within document, as the appropriate official of Beaufort County, South Carolina, who acknowledged the due execution of the foregoing document. IN WITNESS WHEREOF, I have hereunto set my hand and official seal the day and year last above mentioned. ___________________________________ Notary Public for South Carolina My Commission Expires: ____________ (Affix Notary Seal) 134 Item 11. 55950342 v4 EXHIBIT “A” Property Description 135 Item 11. 55950342 v4 EXHIBIT “B” Regulating Plan 136 Item 11. 55950342 v4 EXHIBIT “C” Development Schedule Development of the Property is expected to occur in Phases over the Term of the Development Agreement, with the sequence and timing of development activity to be dictated largely by market conditions. YEAR RESIDENTIAL (DWELLING UNITS) 2027 90 2028 84 2029 70 137 Item 11. 55950342 v4 EXHIBIT “D” BJHT RESTRICTIVE COVENANT 138 Item 11. 55950342 v4 EXHIBIT “E” ARCHITECTURAL GUIDELINES – XXXX 139 Item 11. 55950342 v4 EXHIBIT “F” ARCHITECTURAL GUIDELINES – XXXX 140 Item 11. 55950342 v4 EXHIBIT “F-1” ARCHITECTURAL GUIDELINES – XXXX 141 Item 11. 55950342 v4 EXHIBIT “F-2” ARCHITECTURAL GUIDELINES – XXXX 142 Item 11. 55950342 v4 EXHIBIT “F-3” ARCHITECTURAL GUIDELINES – XXXX 143 Item 11. 55950342 v4 EXHIBIT “F-4” ARCHITECTURAL GUIDELINES – XXXX 144 Item 11. 55950342 v4 EXHIBIT “F-5” ARCHITECTURAL GUIDELINES – XXXX 145 Item 11. 55950342 v4 EXHIBIT “F-6” ARCHITECTURAL GUIDELINES – XXXX 146 Item 11. 55950342 v4 EXHIBIT “G” STATE OF SOUTH CAROLINA ) NOTICE OF TRANSFER AND ) PARTIAL ASSIGNMENT AND ASSUMPTION ) OF RIGHTS AND OBLIGATIONS UNDER COUNTY OF BEAUFORT ) DEVELOPMENT AGREEMENT THIS NOTICE OF TRANSFER AND PARTIAL ASSIGNMENT AND ASSUMPTION OF RIGHTS AND OBLIGATIONS UNDER DEVELOPMENT AGREEMENT (“Partial Assignment” is dated this ____ day of ________________, 20___, by and between Pulte Home Company, LLC, a Michigan limited liability company authorized to conduct business in South Carolina (“Assignor”), and , a ________________________________ (“Assignee”). WITNESSETH: WHEREAS, on or about the _____ day of __________________, 20___, Assignor entered into a Development Agreement (“Development Agreement”) with Beaufort County, South Carolina, incident to the development of certain real property known as Project ______________, which Development Agreement, as amended, controls the Property (as defined herein); and WHEREAS, Assignor entered into an Agreement For Purchase And Sale (“Agreement ”) with Assignee dated ______________, 20___ providing for the sale by Assignor and the purchase by Assignee of certain real property being more particularly described on Exhibit “A” attached hereto and made a part hereof (the “Property”); and WHEREAS, an integral part of the conveyance of the Property by Assignor to Assignee, it is the desire and intention of Assignor to assign to Assignee, and it is the desire and intention of Assignee to assume, certain rights, privileges, and obligations under the terms of the Development Agreement applicable to the Property, thus necessitating the preparation and execution of this Partial Assignment. NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy whereof is herewith acknowledged, parties hereby agree as follows, to writ: 1. Partial Assignment and Assumption of Rights, Privileges and Obligations Applicable to the Property Pursuant to the Development Agreement. Assignor does hereby transfer, assign, convey and deliver unto Assignee, its successors and assigns, such rights for the land uses on the Property that are defined in the Development Agreement (the “Assigned Land Use”). Assignee shall be entitled to all of the privileges and obligations as described in the Development Agreement applicable for the Assigned Land Use to the Property except for those certain excluded obligations, rights and privileges (“ Excluded Obligations”) identified herein below, if any. Assignor is hereby released from and Assignee hereby assumes and agrees to perform all of Assignor’s rights, privileges and obligations as described in the Development Agreement applicable to 147 Item 11. 55950342 v4 the Assigned Land Use for the Property, except for the Excluded Obligations, if any. Assignee acknowledges receipt of the Development Agreement and all Exhibits thereto and with respect to the Assigned Land Use and the Property agrees to be bound by the terms thereof, and to develop the Property in accordance with such terms. The rights and obligations hereby assigned and assumed shall be covenants running with the land, binding upon the parties hereto and their successors and assigns. 2. Estoppel Certificate. Pursuant to Article XVIII of the Development Agreement, Assignor hereby certifies the following, to wit: a. that the Development Agreement, as amended, is in full force and effect; b. that the Development Agreement has not been further amended or modified (or if it has the date of such amendment or modification); c. that to the best knowledge of Assignor, all parties to the Development Agreement are in full compliance with all obligations there under as of the date hereof; and d. that to the best knowledge of Assignor, no event has occurred or failed to occur which, with the passage of time or the giving of notice, or both, would constitute an event of default under the terms of the Development Agreement. 3. Notices. Any notice, demand, request, consent, approval, or communication among any of the parties hereto or Beaufort County shall be in writing and shall be delivered as provided under Article XVI of the Development Agreement and shall be addressed as follows: To Assignor: Pulte Home Company, LLC c/o PulteGroup Inc. Attn: Graham Hawkins 4401 Leeds Avenue, Suite 400 North Charleston, SC 29405 With A Required Copy To: Walter J. Nester, III Burr & Forman LLP 23-B Shelter Cove Lane, Suite 400 Hilton Head Island, SC 29928 To Assignee: _____________________________ ____________________________ _____________________________ _____________________________ With a required copy to: ______________________________ ______________________________ ______________________________ ______________________________ 4. Delivery. Assignor covenants and agrees to deliver a copy of this Partial Assignment to Beaufort County and cause the original to be recorded on the land records. 148 Item 11. 55950342 v4 5. Binding Effect. This Partial Assignment shall inure to the benefit of and be binding upon the respective parties hereto, their successors and assigns. 6. Governing Law. The within Partial Assumption shall be interpreted and constructed and conform to the laws of the state of South Carolina. [Reminder of page left intentionally blank.] 149 Item 11. 55950342 v4 IN WITNESS WHEREOF, the parties have caused this Partial Assignment to be duly executed as of the ____ day of _______________, 20___. WITNESSES: ASSIGNOR: Pulte Home Company, LLC a Michigan limited liability company authorized to conduct business in South Carolina _____________________________ ___________________________________ By: Its: _____________________________ STATE OF ) ) ACKNOWLEDGMENT COUNTY OF ) I, the undersigned Notary Public for _______________________, do hereby certify that __________________________, as _____________________ of Pulte Home Company, LLC, personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal this _____ day of _______________, 20___. Notary Public for __________________ My Commission Expires: ______________(Seal) 150 Item 11. 55950342 v4 WITNESSES: ASSIGNEE: ____________________________________________ _____________________________ ___________________________________ By: Its: _____________________________ STATE OF _____________________ ) ) ACKNOWLEDGMENT COUNTY OF ) I, the undersigned Notary Public for _______________________, do hereby certify that __________________________, as _____________________ of _______________________________, personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal this _____ day of _______________, 20___. Notary Public for __________________ My Commission Expires: _____________(Seal) 151 Item 11. 98 Jennings Road Natural Resources Committee June 2, 2025 152 Item 11. Comparison of Zoning Map Amendment Review Criteria • In determining whether to adopt or deny a proposed Zone Map Amendment, the Amendment, the County Council shall weigh the relevance of and consider whether and consider whether and the extent to which the proposed development: 153 Item 11. 1. Consistency with the Comprehensive Plan Staff Comments: No conflict identified. Applicant Narrative: States compatibility with the Development Code and adjacent zoning. Comprehensive Plan Support:  The Plan calls for alignment between zoning and the Comprehensive Plan (p. 137).  Encourages reevaluation of Place Type Overlay tools to ensure effectiveness (p. 163, BE 3.1).are expected to align their work plans with the Plan’s goals (p. 137). 154 Item 11. 2. Conflict with Development Code or Ordinances Staff Comments: No conflict identified. Applicant Narrative: States compatibility with the Development Code and adjacent zoning. Comprehensive Plan Support:  The Plan calls for alignment between zoning and the Comprehensive Plan (p. 137).  Encourages reevaluation of Place Type Overlay tools to ensure effectiveness (p. 163, BE 3.1).are expected to align their work plans with the Plan’s goals (p. 137). 155 Item 11. 3. Demonstrated Community Need Staff Comments: Notes workforce housing and local rehabilitation contributions. Applicant Narrative: Emphasizes entry-level housing and economic diversity. Comprehensive Plan Support:  Supports workforce housing and affordability strategies (p. 154–155, H 1.1, H 2.1, H 3.1).  Recognizes the need for housing that supports military families and young professionals (p. 147– 148, E 2.1, E 4.1).  Calls for “missing middle housing” to diversify housing stock (p. 155, H 3.6). 156 Item 11. 4. Required by Changed Conditions Staff Comments: No, not required by changed conditions. Applicant Narrative: Y es, conditions in the market have changed due to outdated land use and population growth. Comprehensive Plan Support:  Encourages redevelopment and infill to meet growth demands (p. 162, BE 1.1).  Acknowledges the need to adapt zoning to meet evolving housing needs (p.154,H 2.1). 157 Item 11. 5. Compatibility with Surrounding Uses Staff Comments: Compatible with nearby residential and school uses. Applicant Narrative: Aligns with adjacent C3NMU zoning and land use. Comprehensive Plan Support:  Supports transitions between rural and urban areas through Place Types (p. 163, BE 3.2).  Encourages development that complements existing neighborhoods (p. 136). 158 Item 11. 6. Adverse Effects on Nearby Lands Staff Comments: Traffic impact noted; mitigation planned. Applicant Narrative: No adverse effects due to environmental compliance and buffers. Traffic Impact Analysis was completed with very little impact Traffic Impact Analysis: The Ramsey Farm development introduces modest traffic increases that are well within the capacity of the existing and planned infrastructure. With only one minor geometric improvement and no major signalization or widening required, the overall traffic impact is minimal. Comprehensive Plan Support: Requires stormwater and environmental protections (p. 140– 141, NE 1.3, NE 3.3). • Promotes traffic mitigation and complete streets (p. 150– 151, M 1.1, M 2.1). 159 Item 11. 7. Logical and Orderly Development Pattern Staff Comments: Y es, higher density placed near school and roads. Applicant Narrative: Supports walkability and connectivity. Comprehensive Plan Support:  Encourages walkable, connected neighborhoods (p. 150–153, M 1.1, M 5.1).  Supports Place Type planning for orderly growth (p. 163, BE 3.2). 160 Item 11. 8. Adverse Impacts on Natural Environment Staff Comments: Must comply with environmental standards. Applicant Narrative: Includes civic space and natural resource protections. Comprehensive Plan Support:  Emphasizes habitat preservation, stormwater management, and resilience (p. 140–143, NE 1.1, NE 3.3, NE 4.1). 161 Item 11. 9. Adequate Public Facilities Staff Comments: Agencies notified; no issues raised. Applicant Narrative: Existing infrastructure is sufficient. Comprehensive Plan Support:  Supports infrastructure planning and coordination (p. 156–157, CF 1.1, CF 3.1).  Aligns with Capital Improvement Plan priorities (p. 169). 162 Item 11. “The Comprehensive Plan acknowledges that growth is desired and inevitable. . . Balance can be accomplished by guiding development to land that is most suitable based on economic, cultural, social, and environmental principles” Recommendation: We respectfully request your approval of this zoning map amendment so we may move forward in partnership with the County to deliver a project that reflects the values, priorities, and long-term vision of Beaufort County. 163 Item 11. BEAUFORT COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A MEMORANDUM OF UNDERSTANDING WITH THE PORT ROYAL SOUND FOUNDATION FOR SURFACE ELEVATION TABLE STATION COLLABORATION MEETING NAME AND DATE: Natural Resource Committee (June 2, 2025) PRESENTER INFORMATION: Stefanie M. Nagid, Land Preservation Director (5 minutes) ITEM BACKGROUND: This is a new item before County Council PROJECT / ITEM NARRATIVE: The Port Royal Sound Foundation (PRSF) has been named as a partner in informing and advancing priorities identified and codified in Beaufort County’s Comprehensive Plan and Resilience Strategy. The County’s Public Works, Planning and Zoning, and Land Preservation Departments have identified plans, strategies and properties where the County and the PRSF have collaborative interests and efforts in promoting resiliency data collection by installing and monitoring surface elevation table stations in the high marsh habitat. This MOU formalizes the County and PRSF collaborative objectives but does not obligate funding for either party. Any future requests involving specific action items or monetary contributions will be brought forward as separate agreements for Council’s consideration. FISCAL IMPACT: There is no fiscal impact to the County with this MOU STAFF RECOMMENDATIONS TO COUNCIL: Staff recommends approval OPTIONS FOR COUNCIL MOTION: Motion to approve, modify, or deny the County Administrator to enter into a Memorandum of Understanding with the Port Royal Sound Foundation for surface elevation table station collaboration. If approved by the Committee, move forward to County Council on June 23, 2025 for final approval. 164 Item 12. RESOLUTION 2025/____ A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A MEMORANDUM OF UNDERSTANDING WITH THE PORT ROYAL SOUND FOUNDATION FOR SURFACE ELEVATION TABLE STATION COLLABORATION WHEREAS, Beaufort County (County) and the P ort Royal Sound Foundation (Foundation) have ongoing collaborative interests and efforts related to the Port Royal Sound and its surrounding watershed; and WHEREAS, the Foundation has been a named partner in informing and advancing priorities identified and codified in Beaufort County’s Comprehensive Plan and Resilience Strategy; and WHEREAS, the County’s Public Works Department, Planning and Zoning Department and Land Preservation Department have identified plans, strategies and properties where the County and the Foundation collaborative interests and efforts may be implemented with the installation and monitoring of surface elevation table stations; and WHEREAS the County and Fou ndation have committed their int ention to continue to work together to formalize these ongoing collaborative interests and efforts for the benefit of the citizens of Beaufort County as further described in Exhibit A. NOW, THEREFORE, BE IT RESOLVED by Beauf ort County Council , duly assembled, does hereby authorize the County Administrator to enter into a Memorandum of Understanding with the Port Royal Sound Foundation f or surface elevation table station collaboration, as further described in Exhibit A. Adopted this ______ day of ____________, 2025. COUNTY COUNCIL OF BEAUFORT COUNTY By: _______________________________ Alice Howard, Chairwoman ATTEST: _______________________________ Sarah Brock, Clerk to Council 165 Item 12. Page 1 of 3 STATE OF SOUTH CAROLINA ) ) MEMORANDUM OF UNDERSTANDING COUNTY OF BEAUFORT ) SURFACE ELEVATION TABLE STATIONS This Memorandum of Understanding (“MOU”) is entered into on this ____ day of ____________, 2025 (“Effective Date”) by and between Port Royal Sound Foundation , (“PRSF”) a South Carolina nonprofit corporation exempt from federal income tax under Section 501(c)(3) of the Internal Revenue Code, whose address is 310 Okatie H ighway, Okatie, SC 29909; and Beaufort County, (“County”) a political subdivision of the State of South Carolina , whose primary address is 100 Ribaut Rd Beaufort, SC 29901. WHEREAS, the County and the PRSF (collectively known as the “Parties”) work together and have ongoing collaborative interests and efforts between the parties related to the Port Royal Sound and its surrounding watershed; and WHEREAS, the P RSF has been a named partner in informing and advancing priorities identified and codified in Beaufort County’s Comprehensive Plan and Resilience Strategy; and WHEREAS, the County’s Public Works Department, Planning and Zoning Department and Land Preservation Department have identified plans, strategies and properties where the County and PRSF collaborative interests and efforts may be implemented; and WHEREAS this MOU expresses the intention of the Parties to continue to work together to formalize these ongoing collaborative interests and efforts as well as explore other partnerships and opportunities in the future. NOW, THEREFORE, the Parties will work together on collaborative interests and efforts and agree to the Terms and Conditions as follows: 1. TERM. This MOU is valid upon the Effective Date and shall remain in effect until the 3 0th day of June, 2030, unless terminated sooner pursuant to the provisions of this MOU. 2. COMPENSATION. This MOU does not oblig ate County or PRSF funds. Any request involving reimbursement or contribution of funds between the Parties will require a separate written agreement and will be handled in accordance with applicable laws, regulations, and procedures. The County and PRSF wi ll incur all costs and liabilities of their own employees. 3. TERMINATION. Either party shall have the right to terminate this MOU for any reason upon thirty (30) days prior written notice delivered to the designated authority of the other party. Any ongoing projects or commitments at the time of termination shall be addressed in a separate written agreement between the parties. 166 Item 12. Page 2 of 3 4. REPORTING AND CONTACTS. The designated authority for the Parties are identified as follows: County Contact: PRSF Contact: Stefanie Nagid, Land Preservation Director Courtney Kimmel, Director of Conservation 124 Lady’s Island Drive 310 Okatie Hwy Beaufort, SC 29907 Okatie, SC 29909 (843) 255-2152 (404) 405-0808 snagid@bcgov.net ckimmel@portroyalsoundfoundation.org 5. CONDITIONS. The Parties shall work in good faith to enter into specific objective -based agreements, which shall be separately negotiated and executed, for the continued growth and development of the following activities: a. Support for installation, maintenance, and monitoring of Surface Elevation Tables in high marsh areas adjacent to select County p roperties, namely, but not limited to, Widgeon Point Preserve. b. Support for PRSF-managed water quality monitoring program and data analysis that will include and inform stormwater management efforts. c. Support for expanding and accelerating living shoreline installations to stabilize shorelines throughout the Port Royal Sound watershed, and salt marsh conservation and resilience. d. Expand resilience initiatives regionally through the Regional Resilience Working Group. e. Educate and inform visitors and residents on the unique ecological nature of the Port Royal Sound through the continued operation of the PRSF Maritime Center and community programming. f. Encourage and facilitate science-based decision-making by having PRSF serve as an independent scientific resource to provide relevant, credible science and data to inform decisions made by Beaufort County leaders , with PRSF maintaining full editorial independence in its scientific assessments and recommendations. g. Pursue funding to support research and projects to advance our common goals and priorities. The above list should not be taken to exclude or replace other forms of cooperation between the Parties on other issues of common interest. 6. OTHER PROVISIONS. a. Mutual Cooperation. The Parties shall cooperate with each other and will use all reasonable efforts to cause the fulfillment of the terms and conditions of this MOU. b. Entire Agreement. This MOU contains the entire agreement between the Parties pertaining to the subject matter contained herein. The Parties do not intend to create a legal partnership, principal/agent, or joint venture relationship. 167 Item 12. Page 3 of 3 Nothing in this MOU shall be construed as creating such a relationship between the Parties, and neither Party shall have the authority to bind the other Party to any obligation. This MOU is non-exclusive and in no way restricts the County or the PRSF from participating in similar activities or arrangements with other public or private initiatives, organizations, or individuals. c. Amendment or Modification. This MOU cannot be amended or modified orally or by a single party. No amendment or modification to this MOU shall be valid unless in writing and signed by both Parties to this MOU. IN WITNESS WHEREOF, and in acknowledgement that the Parties hereto have read and understood each provision hereof, the Parties have caused this MOU to be executed on the Effective Date. WITNESSES: BEAUFORT COUNTY Michael Moore County Administrator WITNESSES: PORT ROYAL SOUND FOUNDATION Jody Hayward Executive Director 168 Item 12. BEAUFORT COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: RESOLUTION TO APPROVE THE INSTALLATION OF STREET LIGHTS AT OYSTER FACTORY PARK MEETING NAME AND DATE: Natural Resources Committee – June 2, 2025 PRESENTER INFORMATION: Stefanie M. Nagid, Land Preservation Director (10 minutes) ITEM BACKGROUND: Beaufort County acquired the Oyster Factory Park in 2003 through the Rural and Critical Lands Preservation Program. A master plan and associated agreement between the County and the Town of Bluffton for improvements, maintenance and management was executed in 2004, and amended in 2015, 2017, and 2022. The agreement requires Council approval for any improvements made on the property. PROJECT / ITEM NARRATIVE: The Town of Bluffton is asking Council to approve the installation of six (6) street lights on Oyster Factory Park along Bridge Street for security and safety of pedestrians and vehicles utilizing the park during non-daylight hours. FISCAL IMPACT: None to the County STAFF RECOMMENDATIONS TO COUNCIL: Staff recommends approval OPTIONS FOR COUNCIL MOTION: Motion to approve or deny the request to install six (6) street lights at Oyster Factory Park 169 Item 13. RESOLUTION 2025/___ A RESOLUTION TO APPROVE THE INSTALLATION OF STREET LIGHTS AT OYSTER FACTORY PARK WHEREAS, Beaufort County (“County”) is sole owner of certain real property (R610 039 00A 0165 0000 and R610 039 00A 0190 0000) and co-owner of certain real property (R610 039 00A 0191 0000) in Beaufort County, South Carolina known as Oyster Factory Park (“Property”) in the Town of Bluffton under and by virtue of deeds recorded in the Beaufort County Register of Deeds at Deed Book 1693, Page 2006, and Deed Book 2587, Page 58, Beaufort County, South Carolina; and WHEREAS, the Open Land Trust (“Trust”) holds a Conservation Easement on the Property, as recorded in the Beaufort County Regis ter of Deeds at Book 1548, Page 626, Beaufort County, South Carolina, which was amended in 2003 as recorded in the Beaufort County Register of Deeds at Book 1693, Page 2002, Beaufort, South Carolina; and WHEREAS, in 2004, the County and Town of Bluffton (“Town”) entered into an Agreement for management, maintenance and improvements on the Property, which was amended in 2015 , in 2017, and again in 2022 and included updates to the Oyster Factory Park Master Plan; and WHEREAS, the Agreement between County and Town dated February 17, 2017, and amended in 2022, provides that the park shall be maintained as open space and that there shall be no improvements constructed without the express, written consent of the County; and WHEREAS, the County and Town staff have agreed to the installation of six (6) street lights on the Property along Bridge Street. NOW THEREFORE, BE IT RESOLVED, BY BEAUFORT C OUNTY COUNCIL , duly assembled, does hereby approve the installation of six (6) street lights on Oyster Factory Park along Bridge Street, as provided in Exhibit A attached and incorporated herein by reference. Adopted this ____ day of ____________, 2025. COUNTY COUNCIL OF BEAUFORT COUNTY BY: Alice Howard, Chairwoman ATTEST: Sarah Brock Clerk to Council 170 Item 13. R610 039 00A 0190 0000 R610 039 00A 0191 0000 R610 039 00A 0165 0000 - Streetlights 171 Item 13. 172 Item 13. Natural Resources Committee 1st Term needs 6/11 Council Votes 2nd Term needs 8/11 Council Votes 3rd Ter m needs 10/11 Council Votes Boards and Commissions Appointments and Reappointments Zoning Board of Appeals Evan Bromley Term to be served: 2nd Reappointment 173 Item 14. 174 Item 14.

Source: Beaufort County website. First collected Nov 8, 2026.