Special Called County Council Meeting
Beaufort County, SC
2nd Floor Ceremonial Courtroom, Beaufort County Courthouse, 102 Ribaut Road, Beaufort,
SC 29902
Monday, May 19, 2025
5:00 PM
AGENDA
COUNCIL MEMBERS:
ALICE HOWARD, CHAIR ANNA MARIA TABERNIK, VICE CHAIR
DAVID P. BARTHOLOMEW PAULA BROWN
LOGAN CUNNINGHAM GERALD DAWSON
YORK GLOVER MARK LAWSON
LAWRENCE MCELYNN JOSEPH PASSIMENT
THOMAS REITZ
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. STATEMENT OF COMPLIANCE WITH FOIA
4. APPROVAL OF AGENDA
5. CITIZEN COMMENTS PERIOD – 30 MINUTES TOTAL
6. DISCUSSION RELATED TO THE INTERGOVERNMENTAL AGREEMENT BETWEEN BEAUFORT COUNTY A ND
THE SOUTH CAROLINA TRANSPORTATION INFRASTRUCTURE BANK (SIB) CONCERNING IMPROVEMENTS
OF HIGHWAY US 278 FROM MOSS CREEK DRIVE TO SPANISH WELLS ROAD AND THE ACTION TAKEN BY
THE SIB AT THEIR MEETING ON MAY 12, 2025- Mike Moore, County Administrator & Jared Fralix, Assistant
County Administrator, Infrastructure
7. ADJOURNMENT
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
1
2
#3 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: Ji/ / f / CX-)
� I
Na me: Print: ---=-'==-=a----=--rn_��==+----¥�=-r:,;___----�----
Signature: ---------+-------------f-----
Home Address: ---------1C'""7""--------------
Email Address: ;y;, j'Y\.OL '-1'.ll � e (,-lt �h, �J'Is ( Ci. rd S:C. qav'
Phone Number: ------,.-------- District: ____ _ _
Topic: _ ___,:);.:c...=_1-L--
i
v.-, ________________ _
#4 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: .5 11 'f /�o�"'r•7
Name: Print: lwr '1 Jn / vh uL I
Signature: lk:l-A
=:i:/1 ,14�_o,.a'-t .. -
Home Address: / 9 f/:vdv 1.iP � f ,.,,� d td
Email Address: /i.,, r., r e,.n,w ,Mc; - c:, ,( vA / 1 'f (J''''J ✓- (.Av/ Phone Number: £91fJ'- )__f 4. -- 7 EtJ.J District: _____ _
'')7.L9 Topic: _ __:_�...!..,__-=v _________________ _
3
#5 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: --------
Name: Print: ----------------------
Signature: _____________________ _
Home Address: ---------------------
Email Address: ---------------------
Phone Number: District: ----------- --------
Topic: _______________________ _
#6 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: I 1 1-f --,..----t-----==-----..------
Home Address: ---------------------
Email Address: ---------------------
Phone Number: District: ----------- --------
Topic:�
4
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
DISCUSSION RELATED TO THE INTERGOVERNMENTAL AGREEMENT BETWEEN
BEAUFORT COUNTY AND THE SOUTH CAROLINA TRANSPORTATION
INFRASTRUCTURE BANK (SIB) CONCERNING IMPROVEMENTS OF HIGHWAY US 278
FROM MOSS CREEK DRIVE TO SPANISH WELLS ROAD AND THE ACTION TAKEN BY
THE SIB AT THEIR MEETING ON MAY 12, 2025
MEETING NAME AND DATE:
SPECIAL CALLED MEETING OF COUNTY COUNCIL – May 19, 2025
PRESENTER INFORMATION:
Mike Moore, County Administrator and Jared Fralix, Assistant County Administrator
ITEM BACKGROUND:
In November 2021 Beaufort County entered into an Intergovernmental Agreement (IGA) with the with the
South Carolina Transportation Infrastructure Bank (SIB) to finance improvements along the US 278 corridor
from Moss Creek Drive to Spanish Wells Road. The project aimed to replace the eastbound Karl Bower Bridge
over Mackey Creek, increase capacity, reduce congestion, potentially improve the three other bridge
structures, and make multimodal transportation improvements to the corridor. The original funding plan
included:
SIB Contribution: Up to $120 million
Beaufort County: $80 million from the 2018 1% Sales Tax Referendum, $12.3 million from Road
Impact Fees, and $7 million from General Obligation Bonds
Town of Hilton Head Island: $3.35 million in the form of right-of-way dedication
Federal Guideshare Funds: $4.2 million
SCDOT Bridge Replacement Funds: $65.5 million
This brought the total project funding to $292.35 million.
The county and SCDOT committed to expending all financial contributions for the project before SIB would be
obligated to pay or reimburse any eligible costs on the project and to provide additional funding to complete
the project in the event of cost overruns.
The preferred alternative called for a six-lane bridge and six-lane road improvements. However, due to
significant inflation from 2021 to 2024, the projected cost rose to $490 million, prompting the County to seek
additional funding. A proposed penny sales tax referendum to allocate an additional $90 million to the project
was placed on the November 2024 ballot but did not pass.
Following the referendum’s failure, Beaufort County developed a revised, lower-cost plan—championed by
Senator Tom Davis—that included replacing only a portion of the bridge infrastructure. This plan was
approved by a joint resolution and submitted to the SIB for consideration.
5
On March 28, 2025, the County Administrator submitted a formal update to the SIB outlining the revised
scope. The proposal included a three-lane eastbound bridge, diverging from the original six-lane plan. On
April 14, 2025, the SIB Chairman responded with a series of questions, to which the County Administrator
replied on April 30, 2025.
The SIB Board met on May 12, 2025, and voted to reject the County’s revised proposal. In a follow-up
conference call on May 15, County representatives, including the Chairman of County Council, the County
Administrator, and legislative delegates (Senator Davis, Representatives Newton and Herbkersman), met with
SIB Chairman John White. The following concerns were cited as reasons for rejection:
1. The revised funding sequence conflicted with the IGA, which specified that SIB funds were to be used
first, not last.
2. The Town of Hilton Head Island’s contribution was land (right-of-way), not cash.
3. The scaled-back bridge plan reduced the number of lanes from what was originally agreed upon and
did not believe the SIB should still contribute the full $120,000,000.
4. The County had not clearly outlined a strategy for covering cost overruns; the SIB suggested County
bonding capacity (up to $87 million) be pledged. (Staff does not recommend this)
5. A detailed project timeline for construction and completion was not provided.
6. The SIB expected increased financial commitment from both SCDOT and the County to reduce
reliance on SIB funding.
7. The IGA had been violated since construction did not commence in 2024.
Following this discussion, the County Administrator, County Attorney and ACA Jared Fralix consulted with
SCDOT Secretary Justin Powell. SCDOT expressed a readiness to proceed with replacing the two-lane Mackay
Creek Bridge using $90 million in already committed funds. SCDOT indicated a preference to construct a
three-lane bridge, contingent upon Beaufort County contributing the additional funds needed for the third
lane.
PROJECT / ITEM NARRATIVE:
Staff has identified two viable paths forward:
Option 1: Terminate the IGA with the SIB and collaborate with SCDOT to proceed with replacing the existing
Mackay Creek Bridge. Staff and SCDOT prefer to construct a three-lane bridge to anticipate future corridor
needs. Beaufort County would need to fund the incremental cost of the third lane.
Option 2: Continue negotiating an amended IGA with the SIB. This would include restructuring the funding
sequence to prioritize County funds, then SCDOT funds, and finally any remaining SIB contribution. Beaufort
County would assume responsibility for any cost overruns. The SIB’s full $120M commitment to the project is
critical. If the SIB is unwilling to maintain the IGA commitment, then the project may no longer be viable
without an identified additional funding source.
FISCAL IMPACT:
TBD depending upon what amounts the SIB agrees to contribute and actual costs of the project.
STAFF RECOMMENDATIONS TO COUNCIL:
6
Staff recommends Option 1: Terminate the IGA with the SIB and proceed in partnership with SCDOT to
construct a replacement bridge over Mackay Creek. Staff further recommends coordinating with SCDOT to
construct a three-lane bridge to ensure capacity for future needs.
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny option 1 or 2 for replacement of the bridges to Hilton Head Island and the 278
corridor.
Next Steps: County Council Meeting – May 27 2025
7
Nov. 30
8
9
10
Nov. 30
11
12
13
14
15
16
17
2024
18
19
20
21
22
23
24
25
26
27
28
29
30
SIGNATURE PAGE FOR BEAUFORT COUNTY
IN WITNESS WHEREOF, Beaufo1t County has caused this Agreement to be executed on
its behalf and its seal to be affixed hereto.
Attest:
By: ----=--e �--=--1_J Cl)v¼)-=---· _
Printed Name: C � i, f � j Y 4 rv,'..s
Ti tie: Y'f � � t iwJ: +0 f l-0
UJW\��d�
(SEAL)
24
Note: This Agreement was approved by the Beaufort County Council on December 1 3, 2021 by
adoption of Resolution 2021/36.
31
32
33
Beaufort County - US 278 Corridor Improvement Project
Beaufort County - US 278
Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Date: July 24, 2019
34
1
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
This page is intentionally left blank.
35
1
Beaufort County - US 278 Corridor Improvement Project
EXECUTIVE SUMMARY
The US 278 Corridor Improvement project is in Beaufort County, SC and includes the consideration of improvements for the US
278 Corridor from Moss Creek Drive to Spanish Wells Road. The project corridor is a SC Department of Transportation (SCDOT)
owned and maintained facility and is a part of the National Highway System (NHS). In addition, US 278, including the entire project
limits, is within the Strategic Statewide Freight Roadway Network in the SCDOT South Carolina Statewide Freight Plan. US 278 is
the only access onto and off Hilton Head Island, and improvements to this corridor provide a public benefit to the residents,
employees, and the large amount of tourism that not only benefits the region, but the en tire state.
The estimated cost for this project is $246 million, with an additional $26.4 million in project risk, resulting in the need for a total of
$272.4 million. South Carolina Department of Transportation (SCDOT) budgeted $43.5 million to replace th e eastbound span of
the Karl Bowers Bridge. In addition, Beaufort County voters have implemented a 1 cent transportation sales tax to raise $80 million
for this project and additional local matches (described further in the Financial Plan) have provided an additional $12.35 million to
ensure that this project does not simply address a structural issue but truly solves a long -term capacity concern for the corridor.
Beaufort County is respectfully requesting that the State Infrastructure Bank (SIB) provide th e remaining funds for this
project in the amount of $120 million, less than 50% of the total cost, bringing the full funding allocations of this project ,
including assessment of project risk, to $272.4 million.
The purpose of this project is to address structural deficiencies at the existing eastbound Karl Bowers Bridge over MacKay Creek,
to increase capacity, and reduce congestion along US 278 from Moss Creek Drive to Spanish Wells Road. US 278 is part of the
National Highway System (NHS).
Public Benefit
The US 278 Corridor Improvement Project is a project of statewide significance.
The implementation of this project will:
• Increase mobility of people and goods.
• Increase reliability and capacity of the transportation network by decreasing congestion and d elay.
• Improve or replace the deteriorating conditions of existing bridges.
• Improve public safety and improve hurricane evacuation routes.
• Improve the quality of life for the region’s population and visiting guests.
• Support local, regional, and statewide economies
The improvements proposed along this section of the US 278 corridor will address the bottleneck caused by the reduced
2-lane roadway (per direction) where it is joined by 3-lane improvements at both ends of this project. This bottleneck has
caused crippling traffic congestion which has impacted local economies, increased crash rates, and impaired hurricane
evacuation efforts that have plagued this stretch of roadway for decades.
This project supports all the goals and objectives list ed in the South Carolina Department of Transportation, South Carolina
Multimodal Transportation Plan (MTP). This project is consistent with all local land use plans and will include the required
transportation network enhancements to keep pace with the growth this area is experiencing and will continue to see. The County,
MPO, and Town of Hilton Head Island have all passed resolutions supporting this important project in the regional infrastruct ure.
The SIB Criteria states that “the ranking and scoring is done as part of the program categories Long Range Plan.” This project
has met the criteria and is listed in the priority list by SCDOT as well as being the number one priority in the LATS MPO. Th rough
the LATS MPO criterion scoring of projects, this project, identified a s the number one priority, has a score of 74. Based on the
provided criteria for Public Benefit, as well as identifying that these improvements are part of both the National Highway System
and the State Freight Network , the resulting score is a 74/100 whic h equals 37 points x 1.1=40.7. As the maximum number of
points within the Public Benefit section is capped at 50, this project scores 40.7 points for the Public Benefit criteria.
Financial Plan
This project is in excess of $50 million and will follow the guidelines as described in the SIB criteria requiring a local contribution of
at least 25% of the total project costs with additional credit provided for the grant application for each additional 5% of l ocal
contribution and non-Bank funding. The $246 million project, including project risk, is broken down as follows:
36
2
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Based on the points calculation within Section 5.2.a, the following points are allocated for this project:
For a project over $50 million, the amount of local contribution must be at least 25%. With a $246 million project, 25% of th e total
cost is $61.5 million. The Beaufort County one-cent tax provides $80 million specific to this project, thereby meeting the 25%
local fund commitment, and exceeding the match with an additional $18.5 million. This equates to 15.04 points.
The Beaufort County Road Impact Fees provide an additional $12.3 million equating to an additional 10 points.
Per Section 5.24, the additional elements as noted in Table 8 provide an additional local match / non-Bank funded amount of $60.1
million. This equates to 24.42 points.
The committed funds in both local match as well as non -Bank funds resu lt in a total score of 49.46 points of the available 50
points.
Point of Contact: Robert McFee, PE, Director
Engineering & Infrastructure
Beaufort County Engineering Division
Mailing Address: P.O. Box 1228
Beaufort, SC 29901-1228
Street Address: 104 Industrial Village Road
Beaufort, SC 29906
Telephone: 843-255-2730
Facsimile Number: 843-255-9420
E-Mail Address: RMcFee@bcgov.net
Relationship to Applicant: Beaufort County on behalf of
the South Carolina Department of Transportation
Application Prepared by: JMT
Jennifer J. Ray, AICP
Address: 952 Houston Northcutt Boulevard
Suite 100
Mt. Pleasant, SC 29464
Telephone: 410-316-2231
E-Mail Address: JRay@JMT.com
Total Cost to Prepare: $125,000
AMOUNT OF LOCAL CONTRIBUTIONS
FUNDING SOURCE AMOUNT
Beaufort County one-cent tax referendum, as approved by the voters on November 6, 2018 $80,000,000
Beaufort County Road Impact Fees $12,300,000
Per Section 5.25
Federal Guideshare / Local money for the Environmental Assessment/Preliminary Engineering $4,200,000
SCDOT Bridge Replacement Funds $43,521.112
Beaufort County Funds for Jenkins Island Work $9,000,000
Town of Hilton Head Island Right-of-Way Dedication $3,350,000
Total Local / Non-Bank Funded Match including Project Risk (see Table 8) $152,370,112
SCIB Grant Request $120,000,000
Total Project Risk $272,370,112
37
3
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
TABLE OF CONTENTS
(Section Numbering corresponds to the Application Criteria)
EXECUTIVE SUMMARY .................................................................................................................................................................. 1
III. DESCRIPTION OF PROJECT ..................................................................................................................................................... 5
PROJECT SCOPE ........................................................................................................................................................................ 5
PROJECT INTENT ....................................................................................................................................................................... 7
IV. PUBLIC BENEFIT ..................................................................................................................................................................... 11
4.1 TRAFFIC STUDIES & SUPPORTING DATA ....................................................................................................................... 12
4.2 URGENCY OF PROJECT .................................................................................................................................................... 18
4.3 ECONOMIC DEVELOPMENT RESOLUTION ...................................................................................................................... 19
4.4 CERTIFICATE FROM THE ADVISORY COORDINATING COUNCIL FOR ECONOMIC DEVELOPMENT OF THE
DEPARTMENT OF COMMERCE ............................................................................................................................................... 19
4.5 CURRENT AND FIVE-YEAR HISTORY OF UNEMPLOYMENT DATA ............................................................................... 20
4.6 LOCAL SUPPORT FROM RESIDENTS THROUGH PETITIONS OR COMMENTS AT PUBLIC HEARINGS .................... 21
4.7 LOCAL RESOLUTIONS ....................................................................................................................................................... 26
4.8 REGIONAL AND STATEWIDE SIGNIFICANCE .................................................................................................................. 29
4.9 PROS AND CONS OF ALL ALTERNATIVE TRANSPORTATION PLANS TO THE PROJECT .......................................... 41
4.10 ENVIRONMENTAL IMPACTS OF PROJECT .................................................................................................................... 42
4.11 EVENTS/MILESTONES TO IMPLEMENT PHASES OF PROJECT .................................................................................. 44
4.12 CURRENT STATUS OF THE PROJECT ........................................................................................................................... 44
4.13 ENTITY STATEMENT AGREEING TO RESPONSIBILITIES ............................................................................................ 45
4.14 PROJECT SCORE ............................................................................................................................................................. 45
4.15 CONSULTATION WITH THE DEPARTMENT OF COMMERCE ....................................................................................... 45
V. FINANCIAL PLAN ..................................................................................................................................................................... 46
5.1 TOTAL PROJECT COST ...................................................................................................................................................... 46
5.2 PROJECT WITH TOTAL COST: IN EXCESS OF $50 MILLION .......................................................................................... 46
5.3 SOURCE OF LOCAL CONTRIBUTION ............................................................................................................................... 47
5.4 AMOUNT OF ASSISTANCE REQUESTED FROM BANK ................................................................................................... 47
5.5 FORM OF ASSISTANCE REQUESTED .............................................................................................................................. 47
5.6 OTHER PROPOSED SOURCES OF FUNDS ...................................................................................................................... 47
5.7 ANTICIPATED SCHEDULE OF FUNDS DISBURSEMENT ................................................................................................. 47
5.8 SCHEDULE OF PROJECT RECEIPT FOR LOCAL CONTRIBUTIONS .............................................................................. 48
5.9 COMMITMENT TO FUTURE MAINTENANCE .................................................................................................................... 48
5.10 CONTINGENCY PLANS SHOULD THE BOARD APPROVE LESS THAN THE REQUESTED FINANCIAL ASSISTANCE
OR ACTUAL PROJECT COSTS EXCEED ESTIMATED PROJECT COSTS ............................................................................ 48
5.11 IMPACT FEES .................................................................................................................................................................... 48
5.12 HOSPITALITY TAX ............................................................................................................................................................. 49
38
4
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
5.13 LOCAL SALES TAX ............................................................................................................................................................ 49
5.14 USER FEE .......................................................................................................................................................................... 49
5.15 TAX INCREMENT FINANCING DISTRICTS ...................................................................................................................... 49
5.16 ASSESSMENT PROGRAM ................................................................................................................................................ 49
5.17 DEVELOPMENT AGREEMENT PROGRAM ..................................................................................................................... 49
5.18 ZONING & LAND USE CONTROLS TO FOSTER USE OF EXISTING ROADS TO CONNECT DEVELOPMENTS ........ 49
5.19 CASH FLOW ANALYSIS .................................................................................................................................................... 49
5.20 INFLATION RATE ............................................................................................................................................................... 50
5.21 CONDEMNATION PROCEEDINGS ................................................................................................................................... 50
5.22 OTHER FUNDING SOURCES SOUGHT ........................................................................................................................... 50
5.23 POTENTIAL OBSTACLES ................................................................................................................................................. 50
5.24 LOCAL MATCH OR CONTRIBUTION ................................................................................................................................ 50
39
5
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
III. DESCRIPTION OF PROJECT
The US 278 Corridor Improvement project is in Beaufort County, SC and includes the consideration of improvements for the US
278 Corridor from Moss Creek Drive to Spanish Wells Road. The project corridor is a SC Department of Transportation (SCDOT)
owned and maintained facility and is a part of the National Highway System (NHS). In addition, US 278, including the entire project
limits, is within the Strategic Statewide Freight Roadway Network in the SCDOT South Carolina Statewide Freight Plan. US 278 is
the only access onto and off Hilton Head Island, and improvements to this corridor prov ide a public benefit to the residents,
employees, and the large amount of tourism that not only benefits the region, but the entire state.
PROJECT SCOPE
The purpose of this project is to address structural deficiencies at the existing eastbound Karl Bowers Bridge over MacKay Creek,
to increase capacity, and reduce congestion along US 278 from Moss Creek Drive to Spanish Wells Road. US 278 is part of the
National Highway System (NHS). The eastbound Karl Bowers Bridge will be replaced; it was originally buil t in 1956 and is
scheduled for replacement. Additional potential improvements include:
• Modifications to the remaining three bridge structures;
• Improved access to Pinckney Island National Wildlife Refuge; and
• Improved access to the C.C. Haigh, Jr. boat ramp.
Considerations for multimodal transportation improvements for this corridor will also be included.
Prior to the western limit at Moss Creek Drive, this project will tie into the Bluffton Parkway flyover ramps that were constructed in
2015. At the eastern limit, the project will tie into the Cross-Island Parkway, which begins just east of the intersection with Spanish
Wells Road and Wild Horse Road on Hilton Head Island. The Karl Bowers Bridge and the J. Wilton Graves Bridge each contain
two separate structures for the eastbound and westbound travel lanes, adding up to four structures in total that will be modified for
improvement or replacement . Multimodal transportation imp rovements will be considered to provide better connectivity between
existing networks and facilities. The at-grade intersections at Pinckney Wildlife Refuge, Hog Island, Jenkins Island , Squire Pope
Road, and Spanish Wells Road will be evaluated for necessa ry intersection safety improvements. Any needed upgrades will be
included in this project.
The estimated cost for this project is $246 million, with an additional $26.4 million in project risk, resulting in the need for a total of
$272.4 million. South Carolina Department of Transportation (SCDOT) budgeted $43.5 million to replace the eastbound span of
the Karl Bowers Bridge. In addition, Beaufort County voters have implemented a 1 cent transportation sales tax to raise $80 million
for this project and additional local matches (described further in the Financial Plan) have provided an additional $12.35 millio n to
ensure that this project does not simply address a structural issue but truly solves a long -term capacity concern for the corridor.
Beaufort County is respectfully requesting that the State Infrastructure Bank (SIB) provide the remaining funds for thi s
project in the amount of $120 million, less than 50% of the total cost, bringing the full funding allocations of this project ,
including assessment of project risk, to $272.4 million.
IMAGE 1: US 278 BRIDGES TO HILTON HEAD ISLAND
40
6
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
MAP 1: PROJECT CORRIDOR MAP
41
7
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
PROJECT INTENT
The US 278 Corridor Improvement Project is a project of statewide significance.
The implementation of this project will:
• Increase mobility of people and goods.
• Increase reliability and capacity of the transportation network by decreasing congestion and delay.
• Improve or replace the deteriorating conditions of existing bridges.
• Improve public safety and improve hurricane evacuation routes.
• Improve the quality of life for the region’s population and visiting guests.
• Support local, regional, and statewide economies
The improvements proposed along this section of the US 278 corridor will address the bottleneck caused by the reduced
2-lane roadway (per direction) where it is joined by 3-lane improvements at both ends of this project. This bottleneck has
caused crippling traffic congestion which has impacted lo cal economies, increased crash rates, and impaired hurricane
evacuation efforts that have plagued this stretch of roadway for decades.
The US 278 bottleneck has not only become a transportation challenge for residents and visitors in the immediate project vicinity,
but it has also hampered the movement of people and goods impacting both local and regional economies . A large portion of
Beaufort County’s labor force must face long delays every day on their commute to and from work across these bridges. Eliminating
this bottleneck will promote employment in the area by improving mobility and decreasing congestion.
This project builds upon work that has been in motion for years and is the inevitable next step and missing link to complete both
the US 278 Corridor Improvements as well as the Bluffton Parkway Project, providing an improved connection from Hilton Head
Island to the mainland. (Refer to Map 2) This project has been listed in master plans by the State, County, MPO, and Local
Governments.
US 278 CORRIDOR IMPROVEMENTS
The transportation network in Beaufort County has been undergoing significant improvements to accommodate the growing
population (16.3% increase from 2010 to 2018)1, a booming tourism industry and supporting economies, such as recreation, dining,
and hospitality. To keep pace with transportation demand, US 278 has undergone a variety of improvement s including widening
of US 278 from four lanes to six lanes (from Okatie Highway SC 170 to the eastern approach to the US 278 bridges to Hilton Head
Island and from Squire Pope Road to Wilborn Road).
US 278 Phase 1 (Funded by Beaufort County and SCDOT) – Construction completed 2008 - 2013, the mainland portions of US
278 were widened from four to six lanes from SC 170 to the approaches to the Atlant ic Intracoastal Waterway. This section of
roadway was widened to increase safety and capacity resulting from t he increasing residential and retail growth of the area and
tourism on Hilton Head Island.
US 278 Phase 2 – Anticipated Construction 2019, includes improvement or replacement of US 278 on Jenkins Island. This roadway
project will widen US 278 from four lanes to six lanes. It will include a multiuse path and will follow a super street design to eliminate
left turns and allow only right in and right out entry.
BLUFFTON PARKWAY PROJECT EXPANSION - The Bluffton Parkway Project was an effort led by Beaufort County to address
the traffic and safety issues along the congested US 278 corridor leading onto Hilton Head Island by creating the Bluffton Parkway
as an alternative route to US 278 to alleviate delays and congestion and serve as a hurricane evacuation route. The 12-mile
parkway was completed in 2015 and connects to US 278 at the western side of the Karl Bowers Bridge and includes two 12 ft.
travel lanes in each direction, a 24 ft. landscaped median, and eight ft. multiuse pathways paralleling both sides of the roadway.
1 U.S. Census Bureau, Population Estimates, Percent Change – April 1.2010 to July 1, 2018
42
8
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Bluffton Parkway, Phase 1
Bluffton Parkway, Phase 2
Bluffton Parkway, Phase 3
Bluffton Parkway, Phase 4
Bluffton Parkway, Phase 5
US 278, Phase 2
US 278, Phase 1
US 278 - Phase 1
Completed in 2008 and 2013
US 278 - Phase 2
Anticipated Construction
2019
Bluffton Parkway - Phase 4
General Obligation Bonds
Bluffton Parkway - Phase 3
General Obligation Bonds
Bluffton Parkway - Phase 2
General Obligation Bonds
Bluffton Parkway - Phase 1
By Development Agreement
Bluffton Parkway - Phase 5
Completed in 2012 - 2015
1 cent Sales Tax / FHWA Grant
MAP 2: US 278 CORRIDOR IMPROVEMENTS & BLUFFTON PARKWAY PROJECTS MAP
43
9
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
SUPPORTS SCDOT’S MULTIMODAL TRANSPORTATION PLAN (MTP) GOALS
This project supports all the goals and objectives listed in the South Carolina Department of Transportation, South Carolina
Multimodal Transportation Plan (MTP). (See Table 1)
TABLE 1: SCDOT MULTIMODAL TRANSPORTATION PLAN GOALS & OBJECTIVES (EXCERPT)
OBJECTIVES: ACHIEVED BY
THIS PROJECT
GOAL: MOBILITY AND SYSTEM RELIABILITY
Reduce the number of system miles at unacceptable congestion levels. ✔
Utilize the existing transportation system to facilitate enhanced modal options for a growing
and diverse population and economy. ✔
Improve travel time reliability (on priority corridors or congested corridors). ✔
Reduce the time it takes to clear incident traffic. ✔
Utilize the existing transportation system to facilitate enhanced modal options for a growing
and diverse population and economy. ✔
GOAL: SAFETY AND SECURITY
Reduce highway fatalities and serious injuries. ✔
Reduce bicycle and pedestr ian and other vulnerable roadway users’ fatalities and serious
injuries. ✔
Reduce roadway departure related fatality and serious injury crashes. ✔
Reduce fatal and serious injury crashes within work zones. ✔
Reduce highway - rail grade crossing crashes involving fatality or serious injury. N/A
Reduce fatal and serious injury crashes at intersections. ✔
Reduce fatal and serious injury crashes involving commercial motor vehicle. ✔
GOAL: INFRASTRUCTURE CONDITION
Maintain or improve the current state of good repair for the NHS. ✔
Reduce the percentage of remaining state highway miles (non -interstate/strategic corridors)
moving from a “fair” to a “very poor” rating while maintaining or increasing the % of miles
rated as “good”.
✔
Improve the condition of the state highway system bridges. ✔
Improve the state transit infrastructure in a state of good repair. ✔
GOAL: ECONOMIC AND COMMUNITY VITALITY
Utilize the existing transportation system to facilitate enhanced freight movement to support
a growing economy. ✔
GOAL: ENVIRONMENT
The SCDOT’s Multimodal Transportation Plan (MTP) does not include objectives under this
goal but does include guiding principles to implement this goal. This project will implement
these guiding principles as appropriate throughout the lifecycle of this project.
✔
GOAL: EQUITY
The SCDOT’s Multimodal Transportation Plan (MTP) does not include objectives under this
goal but does include guiding principles to implement this goal. This project will implement
these guiding principles as appropriate throughout the lifecycle of this project.
✔
Source: South Carolina Department of Transportation, South Carolina Multimodal Transportation Plan (MTP) (2014)
44
10
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
CONSISTENCY WITH LOCAL LAND USE PLANS
Consistent with local land use plans, this project represents tangible progress towards achieving goals and objectives set by the
state and municipalities across the region.
The project is located within a rural / undeveloped land use area providing the transportation linkage between regional commercial
land along the US 278 corridor in Bluffton and a mix o f lands use types on Hilton Head Island including park, non -residential, and
residential land.
Maps 3 – 6, extracted from the 2010 Beaufort County Comprehensive Plan , depict that this project is consistent with both the
existing and future land use plans for the area. This project will include the required transportation network enhancements to keep
pace with the growth this area is experiencing and will continue to see.
MAP 4: EXISTING LAND USE / HILTON HEAD ISLAND
BEAUFORT COUNTY COMPREHENSIVE PLAN (2010)
Project Area
Project Area
MAP 6: FUTURE LAND USE / HILTON HEAD ISLAND
BEAUFORT COUNTY COMPREHENSIVE PLAN (2010)
Project Area
Project Area
MAP 3: EXISTING LAND USE / BLUFFTON AREA
BEAUFORT COUNTY COMPREHENSIVE PLAN (2010)
MAP 5: FUTURE LAND USE / BLUFFTON AREA
BEAUFORT COUNTY COMPREHENSIVE PLAN (2010)
45
11
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
IV. PUBLIC BENEFIT
ENHANCEMENT OF MOBILITY AND SAFETY
US 278 is an essential urban principal arterial and the only connection
between Hilton Head Island and the mainland, carrying 56,300 vehicles
per day 2, making it one of the most congested roadways in South
Carolina. There is more traffic on this section of US 278 than nearby
Interstate 95 as it crosses into Georgia, which carries an average of only
55,300 vehicles daily.3 The bottleneck on US 278 created by the narrow
bridges is quite significant, making traveling US 278 to and from Hilton
Head Island no leisurely task. On a busy summer weekend, it can take
hours to get on and off the island. Each day, residents, tourists, retirees,
hospitality workers, and beachgoers all face the congested roadway and
the bottleneck that oc curs on both ends of the project. This bottleneck
leads to heightened occurrences of traffic incidents and higher crash
rates. This corridor experiences an elevated number of rear -end type
crashes, which are typical in bottleneck areas.
Decreasing congestion will allow travelers to get to their destinations in
a more efficient manner and increase the safe passage of people and
goods to and from Hilton Head Island. This is imperative, especially for
the work force that travels every day from Jasper, Hampto n, and
Allendale Counties. Every delay impacts their livelihood as well as their ability to support their own local economies, which then
ripples into regi onal and state impacts. The supporting evidence that substantiates this project provides the public b enefit of
enhancing mobility and safety is included throughout Sections 4.1 – 4.15 of IV. Public Benefit.
INCREASE IN THE QUALITY OF LIFE AND GENERAL WELFARE OF THE PUBLIC.
The regional population of the Hilton Head Island -Bluffton-Beaufort MSA and Beaufo rt County is projected to continue to see
growth rates higher than the overall growth rate of the state. Beaufort County is the 7th fastest gro wing county in South Carolina.
This population growth has added and will continue to add increased pressure to t he transportation system leading to more
congestion, delay, and safety issues unless the transportation network is enhanced to accommodate the increased mobility needs
of the growing population.
This project provides an opportunity to improve the quality of life for employees, residents, and visitors of Beaufort County, providing
the opportunity for enhanced recreation, improved public health, an d air quality. The supporting evidence that substantiates this
project provides the public benefit of increasing the quality of life and general welfare of the public is included throughout Sections
4.1 – 4.15 of IV. Public Benefit
PROMOTION OF ECONOMIC DEVELOPMENT
Hilton Head Island is a vacation destination for tourists from across the state and around the country. According to a 2017 study,
over 3,020,000 tourists visit Beaufort County each year. In 2016, tourism in Beaufort County was estimated to contr ibute an
economic impact (output) of approximately $1.53 billion within the County; and approximately 7% of the statewide tourism industry
in South Carolina. Not only is Hilton Head Island rated as the #1 Best Island in the Continental U.S., according to Travel and
Leisure’s World’s Best Award, the area is also known for a variety of world -class golf courses, scenic natural features, historic
architecture, plantation homes, historic forts, fine seafood, famed landmarks, recreational amenities, and a temper ate climate.
Beaufort County contains one of only three National Historic Landmark Districts in South Carolina. B ecause this area’s tourism
generates a substantial amount of revenue for South Carolina, improving the efficiency of the region’s transportation network
should be a high priority for additional state investment.
2 SCDOT, Average Annual Daily Traffic Sheets, Beaufort County (2018)
3 SCDOT, Average Annual Daily Traffic Sheets, Jasper County (2017)
IMAGE 2: US 278 APPROACHING BRIDGES
46
12
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.1 TRAFFIC STUDIES & SUPPORTING DATA
TRAFFIC VOLUMES
US 278 is an essential urban principal arterial on the National Highway System (NHS) and the only connection between Hilton
Head Island and the mainland . SCDOT estimated Annual Average Daily Traffic (AADT) for the project area of US 278, roug hly
between S-242 (FORDING ISLAND RD EXT) to S-79 (SPANISH WELLS RD) is 56,300 AADT, based on 2018 data2 and the
estimated truck traffic accounts for 8% of the total traffic based on SCDOT 2017 truck traffic data. This high percentage of freight
traffic comes as no surp rise being that US 278 is part of the State’s Strategic Freight Network and the only land route for freight
traveling to and from Hilton Head Island. SCDOT estimates that by 2040 this section of roadway will have an AADT of over 65,600
vehicles, increasing the urgency of improving the capacity of the corridor.
With an average of 56,300 vehicles per day, this is one of the most traveled corridors in South Carolina. The traffic volumes on US
278 often exceed those of I-95 and are routinely above 60,000 vehicles per day.
IMAGE 3: US 278 BRIDGES TO HILTON HEAD ISLAND TRAFFIC JAM
Source: The Island Packet
47
13
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
PAVEMENT QUALITY
SCDOT’s Pavement Management Department collects pavement condition data and calculates a Pavement Quality Index (PQI)
to communicate the pavement’s condition rating. A surface’s PQI is given a range between the 0 - 5, higher PQI’s equate to better
pavement quality while a low PQI indicates poorer pavement quality. As shown in Chart 1; the average PQI for this section of US
278 is 3.06, with some fluctuation througho ut the “fair” range. As determined by SCDOT, “fair” is a general term used to describe
the condition of the pavement that has a Remaining Service Life (RSL) of five to nine years.4 Chart 1 shows a noticeable decrease
in pavement quality in the approximate area that corresponds with the structurally deficient eastbound span of the Karl Bowers
Bridge. More information on structural conditions of the bridges is in Section 4.2.
4 SCDOT, The State of the Pavement Report, (2014)
CHART 1: US 278 PAVEMENT QUALITY INDEX
Source: South Carolina Department of Transportation (2017)
Great
Poor
48
14
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
SOUTH CAROLINA CRASH STATISTICS
South Carolina has one of the highest rates of traffic fatalities per 100 million vehicle miles traveled in the country5
• One person is killed every 8.9 hours on South Carolina roadways. 6
• One person is injured every 8.7 minutes.6
• One traffic collision occurs every 3.7 minutes.6
Collisions, resulting injuries, and fatalities are on the rise in South Carolina (Charts 2 & 3), these trends are far exceeding the
national average (See Chart 4).
5 Insurance Institute for Highway Safety Highway Loss Data Institute, General Statistics Based on 2016 US DO T FARS Data (2017)
https://www.iihs.org/topics/fatality-statistics/detail/state-by-state
6 South Carolina Department of Public Safety, South Carolina Traffic Collision Fact Book (2017)
IMAGE 4: TRAFFIC CRASH
Data Source: South Carolina Traffic Collision Fact Book 2017
Data Source: South Carolina Traffic Collision Fact Book 2017
0
200
400
600
800
1000
1200
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
CHART 3: SOUTH CAROLINA 10 YEAR TRAFFIC
FATALITIES (NUMBER OF FATALITIES)
0
20
40
60
80
100
120
140
160
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
CHART 2: SOUTH CAROLINA 10 YEAR MOTOR
VEHICLE COLLISIONS (THOUSANDS OF
COLLISIONS)
49
15
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
CHART 4: MILEAGE DEATH RATE (FATALITIES PER 100 MILLION VEHICLE MILES TRAVELED)
SOUTH CAROLINA vs. NATIONAL AVERAGE
25 YEAR TREND 1993 - 2017
50
16
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
PROJECT AREA CRASH DATA SUMMARY
South Carolina led the country in most traffic fatalities per 100 million
vehicle miles traveled in 2017.5 The state’s roadway network continues
to be one of the deadliest in the United States . This section of roadway is
one of the heaviest traveled corridors in the st ate often experiencing
congestion, delay, and increased amounts of traffic related crash incidents.
At the project limits, travelers are wedged from six lanes into four lanes.
This bottleneck leads to increased congestion and results in heightened
numbers of crashes, especially rear-end crashes caused by the abru pt
accelerating and decelerating of vehicles traveling through the congested
area. As illustrated in Chart 5, this section of US 278 experienced 6 48
total crashes over just a five-year period (2014-2018).7
According to the SCDOT, the statewide average for rear-end type crashes
is approximately 35%. This section of roadway experienced a five -year
average rear-end crash rate of 6 3%, demonstrating that this section is
well above the statewide average for similar roadways.
The US 278 Bridges as they currently exist present a hazardous gateway
into a well-visited tourist attraction and massive economic contributor to the
entire state. Regarding Urban Principal Arterials , one way that SCDOT
mitigates for rear-end crashes in bottleneck area s is by implementing
roadway widening and additional lanes to increase capacity and decrease
congestion. Expanding this section of US 278 to 6-lanes would likely reduce
the total number o f crashes along US 278 and increase the safety of the
traveling public.
7 SCDOT, Five-Year Crash Summary – Beaufort County US 278 (FORDING ISLAND RD) to (SQUIRE POPE RD), (2018)
CRASH SUMMARY
US 278
Project Area (From Fording Island Rd.
Intersection to Squire Pope Rd. Intersection)
01/01/2014 – 12/31/2018
Approximately 3.7 miles
Fatality Crashes 5
Injury Crashes 149
PDO Crashes 494
2014-2018 Total Crashes 648
Rear End 412
Angle 93
Sideswipe 59
Head On 4
Run Off Road 60
Animal 1
Bicycle 0
Pedestrian 2
Other 17
Total Crashes 648
CHART 5 – FIVE-YEAR CRASHES WITHIN
PROJECT LIMITS (2014 – 2018)
Source: South Carolina Department of Transportation
51
17
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Not only did this portion of US 278 have elevated numbers of crashes, but these crashes resulted in heightened reports of fatalities
and injuries. As depicted in Chart 6, in five-years’ time there were 5 fatalities within the project limits and 149 crashes that
resulted in injuries. This dangerous roadway is causing injury for residents, commuters, and tourists. On top of these life-
threatening accidents, 494 crashes that resulted in personal damage only (PDO) were also recorded.
According to the SCDOT, this portion of roadway has a significantly higher amount of crashes than other 4-mile stretches of similar
roadways. As illustrated in Chart 6, the spikes in crashes over the past five years are mostly occurring near the western ends of
this project’s limits, which corresponds to the beginning points of the bottleneck at the western end of the approach to the US 278
bridges. Segment 11.15 – 11.25 is located near the intersection of US 278 and Moss Creek Drive. Segment 11.35-11.45 is located
near the intersection of US 278 and Salt Marsh Drive. Four out of five fatalities in the project limits took place near the bottleneck
at the west end of the bridge. This narrowing roadway is causing a bottleneck in traffic and is fueling the elevated numbers of
injuries and fatalities along this section of US 278. The traffic bottlenecks are creating a hazardous section along one of the most
well-traveled corridors in South Carolina, a state that already yields one of the highest numbers of traffi c fatalities per 100 million
vehicle miles traveled in the country.
CHART 6: FIVE-YEAR CRASHES WITHIN PROJECT LIMITS (2013 – 2017) BY SEGMENT
52
18
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.2 URGENCY OF PROJECT
The current state of the US 278 bridges to Hilton Head Island is producing severe congestion, promoting unsafe travel, limiting
mobility for freight and goods, and ultimately hindering the economic stability of the region. All four of the US 278 bridge structures
are listed as functionally obsolete. The eastbound structure of the Karl Bowers Bridge is also rated as structurally deficient, with a
Sufficiency Rating of only 53.7. As a structurally deficient bridg e, the eastbound bridge over Mackay Creek requires repairs or
replacement to avoid future weight restrictions for this important freight corridor. US 278 has been listed as a system upgrade
project in the 2018 SCDOT Statewide Transportation Improvement Pro gram (2017-2022) to improve the US 278 corridor 8 and is
ranked as the #1 priority project in the Lowcountry Area Transportation Study (LATS) 2015-2019 Transportation Improvement
Program (TIP)9
SCDOT has allocated $43.5 million to be used to remediate the structural deficiencies of the eastbound structure of the Karl Bowers
Bridge. Improving only the structural deficiencies of the eastbound stru cture of the Karl Bowers Bridge will resolve the existing
structural issues through rehabilitation or reconstructio n, but it will not address the pressing capacity and congestion issues
stemming from all four of the 2 -lane bridges. If the structural deficiencies of the eastbound structure of the Karl Bowers
Bridge are not repaired or improved, weight and use restrictio ns will need to be added to the bridges . Weight and use
restrictions on the bridge will result in impaired movement of suppl ies and goods that fuel the thriving tourism -based economy on
Hilton Head Island. With the tourism industry in the Hilton Head Islan d-Bluffton-Beaufort MSA contributing such a
significant amount to South Carolina’s total revenue, these weights and use restrictions would lead to notable statewide
impacts.
It is crucial that this project be approved now for the full funding amount so that the $92.35 million in local funds and the $43.5
million from the SCDOT can be used concurrently with the SIB grant funds to appropriately develop a scope for the project
improving all four bridge spans and addressing both the structural deficiencies of the Karl Bowers Bridge as well as the capacity
issues caused by all four of the narrow bridge spans and associated roadways. This will enhance the flow of commuters, tourists,
labor force workers, and freight across the region.
DETERIORATING CONDITIONS OF EXISTING BRIDGES
According to the American Road and Transportation Builders
Association 2018 Deficient Bridges Report, the US 278
eastbound lane of the Karl Bowers Bridge over Mackay Creek
is ranked #15 on the topmost traveled structurally deficient
bridges in South Carolina ; ranked #1 on this list for the
Lowcountry region.10
During an inspection of the bridges over eight and a half years
ago, Collins Engineers, Inc. found corrosion of the steel girders,
cracks in the concrete girders and footings, loss o f protective
coating in the superstructure, exposure of the footings,
undermining at the channel piers and more. 11 Repairs have
included routing cracks and filling them with flexible mastic
sealant, cleaning corrosion off steel girders and spraying with a
protective coating, repairing the spall at the bottom of some pile
caps, and many more.
8 South Carolina Department of Transportation, Statewide Transportation Improvement Program (2017-2022)
9 Lowcountry Area Transportation Study (LATS) Metropolitan Planning Organization, 2015-2019 Transportation Improvement Program (2016)
10 American Road and Transportation Builders Association, 2018 Deficient Bridge Report (2018)
11 Collins Engineer Inc., Cursory Above Water and Underwater Investigation of US 278 East and West Bound Over Mackay Creek and Skull Creek (2010)
IMAGE 5: CRACKS AND RUST STAINS ON A PILE UNDER US 278
WBL OF KARL BOWERS BRIDGE OVER MACKAY CREEK
Source: Collins Engineer Inc. 2010
53
19
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Bridge inspections performed in 2018
found that the superstructure and
substructure of the eastbound bridge over
Mackay Creek are in poor condition.12
The bridges are facing structural
challenges as well as roadway congestion
and mobility challenges. Therefore, the
replacement of these bridges is a priority
for the region. In addition, while the
bridges are being replaced due to the
structural condition, consideration for the
alleviation of congestion with the new
structures would ensure strategic use of
funds. More information regarding the
urgency of this project is in Section 4.8 -
REGIONAL AND STATEWIDE
SIGNIFICANCE.
4.3 ECONOMIC DEVELOPMENT RESOLUTION
Not applicable. The South Carolina Transportation Infrastructure Bank (the Bank) criteria states: “If applicable, a resolution from
the local governing body or bodies which make a finding, with supporting information, that the project is essential to the ec onomic
development in the area or state and consistent with applicable local land use plans. Must be submitted if applicable as an
Economic Development project.” This project is not an Economic Development project.
4.4 CERTIFICATE FROM THE ADVISORY COORDINATING COUNCIL FOR ECONOMIC DEVELOPMENT
OF THE DEPARTMENT OF COMMERCE
Not applicable. The South Carolina Transportation Infrastructure Bank (the Bank) criteria states:” If applicable, a certificate that
the project is essential to the economic development in the state from the Advisory Coordinating Council for Economic Development
of the Department of Commerce. Must be submitted if applicable as an Economic Development P roject.” This project is not an
Economic Development project.
12 SCDOT: The Office of Bridge Maintenance, National Bridge Inventory Structure Inventory and Appraisal Report (2018)
IMAGE 6: CRACKS ON SUPPORTING CONCRETE BENEATH BRIDGE.
Source: Collins Engineer Inc. 2010
54
20
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.5 CURRENT AND FIVE-YEAR HISTORY OF UNEMPLOYMENT DATA
According to the Bureau of Labor Statistics, SC Dept of Employment & Workforce , Beaufort County and the Hilton Head Island-
Bluffton-Beaufort Metropolitan Statistical Area (MSA) are both tied for having the 10th Best Unemployment Rate (3.2%) compared
to all South Carolina Counties.13 The unemployment rate has been steadily declining for each jurisdiction, as shown in Chart 7.
The civilian labor force and overall employment has been on the rise in the Hilton Head Island -Bluffton-Beaufort M SA, while
unemployment is on the decline, as shown in Table 2. Beaufort County has seen a steady increase in the number of jobs that are
provided through the tourism industry, up 300 jobs between 2015 and 2016.14 Tourism and the military installations are the driving
force behind the low unemployment rates of the County and the MSA. As employment rises in the region, the mobility and efficient
flow of goods and people become heightened priorities for the economic preservation of the area. The effectiveness of the roadway
network must be constantly evaluated and improved upon to ensure the economic viability of the region remains intact.
13 Bureau of Labor Statistics, SC Dept of Employment & Workforce Data (2018)
14 Regional Transactions Concepts, LLC, Estimate Total Impact of Tourism in Beaufort County, SC, 2016 (2017)
TABLE 2: CURRENT & FIVE-YEAR EMPLOYMENT DATA
HILTON HEAD ISLAND-BLUFFTON-BEAUFORT MSA
YEAR CIVILIAN LABOR FORCE EMPLOYMENT UNEMPLOYMENT UNEMPLOYMENT RATE
2018 87,731 84,927 2,804 3.2%
2017 86,333 82,896 3,437 4.0%
2016 84,375 80,834 3,841 4.5%
2015 83,519 78,979 4,540 5.4%
2014 80,930 76,345 4,585 5.7%
Source: Bureau of Labor Statistics, S.C. Dept of Employment & Workforce
3.2%
4.0%
4.5%
5.4%
5.7%
3.2%
4.0%
4.6%
5.5%5.7%
0%
2%
4%
6%
20182017201620152014
CHART 7: FIVE YEAR UNEMPLOYMENT RATE
Hilton Head Island-Bluffton-Beaufort MSA Beaufort County
55
21
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.6 LOCAL SUPPORT FROM RESIDENTS THROUGH PETITIONS OR COMMENTS AT PUBLIC HEARINGS
Local support for the project is reflected in the passage of the 1 cent tax referendum by the citizens in November 2018 that is
providing $80 million dollars for the US 278 project. In addition, there have been multiple public information meetings held to inform
the public about this project.
The Town of Hilton Head Island sponsored the first two public meetings with support from the Town of Bluffton and Beaufort
County. The first public meeting was on July 18, 2018 from 6 pm – 8 pm at the Hilton Head High School; 70 Wilborn Rd, Hilton
Head Island, SC 2992.The second was held on August 15, 2018 from 6 pm – 8 pm at the Bluffton Branch County Library; 120
Palmetto Way , Bluffton, SC 29910. At these meetings a ttendees participated in visioning sessions to discu ss the
transportation needs of the U.S. 278 corridor to Hilton Head Island. Public attendees generally supported the US 278 Corridor
Improvement Project and demonstrated a desire for increased multi-modal facilities along US 278, highly supporting pursuing ways
to decrease congestion along the US 278 corridor and across the region. They also demonstrated support for more alternative
routes to US 278 to improve regional mobility.
SCDOT held the NEPA Scoping Public Meeting on Thursday, September 27, 2018, between 6:00 pm and 8:00 pm at the Hilton
Head High School; 70 Wilborn Rd, Hilton Head Island, SC 29926. The purpose of the meeting was to officially introduce the project
to the community, gather initial comments from the public, identify the needs for the project, and help identify concerns people may
have about the improvements or the project's impact to the natural and human environments. The formal public comment period
for the meeting was open from September 27 through October 12, 2018; including an online comment forum. SCDOT has left the
online comment forum available on the project website and it will remain open throughout the project development process. There
is a second public information meeting planned for September 19 , 2019 to present the range of alternatives as well as the
reasonable alternatives.
The following lists the 102 comments received as a result of the September 27, 2018 public meeting to date:
TABLE 3: COMMENTS FROM SEPTEMBER 27, 2018 PUBLIC MEETING
NO. GENERAL COMMENT
1 In favor of project, sales tax; wants replacement of all 4 bridges, or at least replacement of oldest one and widening of
others
2 Concerned about bridge architecture
3 Traffic lights are a main source of the congestion; only look to widening to 3 lanes;
4 Would like a segregated bike/ped facility
5
Questions regarding the boundaries of the project (where will the highway come in and question about turning right
from the service station)
6 Wants to end the toll on the cross Island parkway
7 Would like to widen to 3 lanes and limit growth
8 Wants to route the highway away from the native islander property; wants cross island rout expanded; wants to exempt
Gullah natives from the toll
9 Add an underpass to connect the boat ramp side to the refuge side, close the median and restrict traffic movement on
existing curb to right in/right out
10 Lives in Windmill Harbor; concerned about entry/exit design; likes the east bound acceleration lane length and width;
should keep a consistent 45mp speed throughout
11 Should have a pull-off lane for accidents; 2 access points to the island; need a safer way for residents at Mariners
Cover/Windmill Harbor to enter 278
12 Interested in road/bridge re- alignment at start of the bridge (assume Bluffton side); continue lanes all the way to Cross
Island
13 Need safer exit/access at Windmill Harbor; remove left turn access at several intersections; separate bike path the
entire corridor
14 Night work wanted; build one bridge at the time; residents need viable lanes for use on the bridge during high tourist
season
56
22
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
15 Thanks for meeting; handouts and displays amazing
16 Thanks; wider shoulders, 3 lanes for traffic each way, aesthetically impressive architecture, hidden power lines, bike
lanes
17 Funding; create programs to reduce commute traffic like rideshare, working with major employers
18 Wants it to stay true to native islanders; native islander sign should be larger; crosswalk over head to the Stoney
community; flyover at Windmill Harbor; not a fan of this meeting format
19 More meetings wanted for the Islanders, ways to get off the island, drainage, more sewer in native community, limb up
trees
20 Concerned if we widen bridges and not all the roads there is no point; would like another bridge from the south end to
Daufuskie Island and then there to Bluffton
21 Was hoping to see how it would be done.
22 open up toll road; be considerate of Gullah community
23 Important to include bike/ped trail
24 include bike lanes on new bridge
25 New bridge separate from existing one; 3 lanes each way
26 Safety concerns regarding signage at the exit for the Cross Island Roadway
27 Disappointed in lack of presentation; would like a presentation for a group of churches
28 wide safe lanes for cycling including access to/from bridge
29 Reverse lanes during specific hours/seasons; work with employers to impleme nt a 15 min clock for employees
30 Reverse lanes during specific hours/seasons; work with employers to implement a 15 min clock for employees
31 Questions about impacts to native islanders; wants consideration of a toll; look at advanced construction techniques
32 Continue on the Bluffton parkway exit lane as free flow instead of merge ; night work during tourist season
33 More lanes & wider bridges needed; reverse a lane
34 Need another bridge
35 need 3 lanes in both directions; environmental impact should be a minimum
36 Concerns about traffic at intersection of 278 and Squire Pope Road
37 Wants improvements
38 Build suspension bridge from new flyover
39 New bridge
40 Noise wall wanted
41 maintenance in Bluffton on 278 medians is poor
42 Continue flyover express to the HHI bridge; include landscaped safe haven medians includin g the native island
community; make the total island pedestrian friendly, improve intersection at Squire Pope Road
43 Wanted to know where the plan was
44 Concerns about Gullah people; does not want to widen but instead reduced speeds
45 Preferred a presentation
46 Preferred a presentation
47 Concerned about timing of project and ability to enter into her family property off of 278 across from the Crazy Crab
48 New bridge to the cross island; suggested a parallel road along 278 over hog island and tha t others at the Town of HHI
had already designed a plan for this
49
Concerned about access to 278 from property along 278 across from Crazy Crab. Suggests additional traffic light
between the bridge & Squire Pope Road; extend the bridge from Bluffton park way to the Cross Island; tunnel;
concerned because they've lost land previously to widenings and are fac ed with this again.
50 Comments regarding the Jenkins Island project
57
23
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
51 Lives in Windmill Harbor; concerned about noise; would like softer pavement ma terials and a wall
52 Wants to know if citizens really have input on the project and worries about the inconvenience to the native islanders
with the widening of the road
53 wants additional bridge; widening to 3 lanes
54 Wants to widen throughout project area because of congestion
55 Would like to see Gatherings neighborhood protected from traffic noise. Upset that the wall built around the community
was shortened and so several homes are exposed
56 Would like bike and ped pathways
57 Thinks it should be 4 lanes both ways; would like to know costs of 4 lanes both ways
58 Wants bike lane; seams in bridge joint should be better maintained in the future
59
Bluffton to blue heron tying into south side of 278 east of existing abutment. A better solution during engineering phase
would be to create a ramp exit for blue heron right at attachment to 278 even if using part of shoulder as deceleration
lane with shoulder ends sign, allowing existing deceleration lane acquired for three lane expansion. Also extend blue
heron east acceleration lane as allowed. Bridge will level on pickney like existing and curve between existing road and
power line approximately 114 feet of room. Park area will be closed during construction and boat ramp should have to
be relocated. During construction and fill of pickney for new three lanes a pass through pre -cast cement tunnel should
be installed with a temporary end wall and as other lanes are closed it can be e xtended for a way to get to the national
refuge and return to Bluffton. Tunnel may need a pump
60
Concerned about widening because of its impact to her property. It is difficult to exit her property now. Would like to
have a way to slow traffic - whether through speed limit or traffic light. Wants a meeting with Stoney Com munity.
61 Opposes RVs having to do U Turns to get to the Hilton Head Harbor RV Resort
62
It is imperative that bicycle and pedestrian accommodations be made for the entire Moss Creek to Squire Pope Rd
stretch. This connectivity should stretch all the way to the existing pathways on the island, on the Bluffton Parkway and
to Moss Creek.
63
I am in favor of replacing the bridge for safety but am opposed to native islanders' land being assumed for this project. I
am opposed to widening the road to include more lanes. The project should not displace any residents of any historical
properties.
64 Please include a bicycle lane on the bridge.
65
I do not want any new bridges to have more than the present two lanes onto the Island. We do not have enough room
on the Island for any more visitors--we are like a balloon, and it will pop. I also agree with the Coastal Conservation
League's position: a new bridge that avoids impacts to the multi- generational Gullah community in the Stoney
neighborhood, accommodates future transit, provides a safe way onto the island for bike and pedestrian traffic and
integrates into the existing neighborhoods on both sides of the river.
66
Please make sure that we include bicycle and pedestrian lanes on the new bridges. It is absol utely imperative that this
is included. our bridge improvements. Currently HHI is a "gold medal bicycle community" but there is no way a sane
person would consider riding through the area being discussed for improvement. Thank you.
67 Windmill Harbour is a well-established residential community and must continue to have safe and practical ingress and
egress. Please add me to any email group that deals with this topic.
68
I hope we can move forward in renovating these aging (but critically important) bridg es. After many years of service in
this harsh marine environment, where any metal corrosion (such as at bridge expansion joints, arch and deck support
points, etc.) will be accelerated, SCDOT is correct in bringing this issue up now and
pushing it to successful completion.
69
Any new bridge should avoid negative impact to the multi- generational Gullah community in the Stoney neighborhood,
accommodates future transit, provides a safe way onto the island for bike and pedestrian traffic and integrates into t he
existing neighborhoods on both sides of the river.
70
Lane access to the Island is totally inadequate and traffic is insane in the morning going to the Island and in the evening
coming off the island. Medical appointments in am to doctors or the hospital causes us to leave several hours early to
get there on time. It’s a bottleneck and it gets worse when come in on Friday and Sat for check in.
71 Email Included 8 pages of further description from previous comment
58
24
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
72
CCL: Summary of letter includes: (1) increased roadway safety for vehicles, bicycles and pedestrians; (3) (2)
anticipation and accommodation of future state and local investments in mass transit; (4) avoidance of adverse impacts
to the existing native islander community in the Stoney neighborhood; (5) protection of important environmental
resources, including Pinckney Island Wildlife Refuge.
73 Concerned about the oil and pollution that go into the waterway from 278, especially into Jarvis Creek if there are
additional lanes. Would like to limit expansion to the current lanes already there.
74
The road should be redirected because of the direct impact on the Gullah family properties: redirect the highway to
follow the existing power lines or to go over the marsh behind the Crazy Crab and ti e back into the cross island
parkway.
75 Does not want to widen the road because of all the traffic and it would take away from the yards and make it more
dangerous for pedestrians.
76
Asked questions - if SCDOT study was incorporating improvements from Beaufort County on Jenkins Island and if
there was enough land to have 3 lanes in both directions underneath the Bluffton Parkway flyover
77 Disagrees with widening from 4-6 lanes because of the impact to the Stoney community and also that it will change the
character of the island.
78
would like an alternate route along the marsh side that would take west bound traffic from Squire Pope Rd off Island to
a 3 lane bridge and another one that would take the eastbound traffic from Spanish Wells from 3 lane br idge; No 3
lanes in Gullah Community; encourages mass transit
79 Concerned about safety of community at large and thinks the speed limit is too high, taking of land from native
islanders; would like a 2nd bridge for the islanders
80
Would like to see the culvert reopened connecting the tidal creek around Hog Island because its currently causing a
loss of shrimp/oyster beds; wants sidewalks/bike paths on HHI to connect to the bridge
81 Thinks the traffic problem is only during peak hours during peak season; does not want any additional tourists; options
should not adversely impact native islanders or the environment; should consider only 1 reversable late, not 2
82 Does not think the road needs to be widened, the speed limit needs to be reduced. Concerned about Stoney
community.
83
Would like to see a bridge come onto the island but would like to come up with a plan to come around the Stoney area.
Would like to look at Spanish Well Road or S. Pope Road to have a new road leaving the island. They (Stoney
Community) would like to meet with the head of the SCDOT.
84 Does not want intrusion into his family land (108 William Hilton Parkway)
85
Concerned specifically about 2 Gullah families specifically in that area. Instead proposes to use the powerline corridor
behind Stoney starting at Windmill Harbor and over to the Cross Island or use the Jarvis Creek Waterway by bridging
from Windmill Harbor to the Cross Island parkway.
86 Provided information on a new 200- unit housing development near Spanish Wells & Jonesville Road. Thinks the traffic
study needed for the development is done by SCDOT and has questions about that.
87 endorse and encourage the inclusion of a new safe bicycle pathway system stretching from Squire Pope over the
bridges onto the Mainland
88 would like to see a bicycle pathway that would allow bicycle traffic to travel safely across the bridge
89 Represents the Native Island community and would like to see if he would host a Q&A in the community
90 I am writing to express my desire for safe, separated, bike/ped facilities across the bridge to connect Bluffton and HHI’s
bike/ped network
91 very supportive of project. Would like bike lanes
92 Both on road bicycle lanes and off-road multi-user side paths are appropriate and warranted
93 I would urge you to include bike and pedestrian pathways from Squire Pope Road to Moss Creek
59
25
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
94
When the SC 802 bridge connecting Lady's Island and Beaufort was built, a fairly narrow ped facility was included. I
have been over the bridge literally dozens of time. I have yet to see the ped facility empty. Also mostly African
Americans exercising walking over the bridge and back. When SCDOT designs a single-track bike/ped facility, please
provide a parking area on each side of the bridge, the mainland and especially on HHI side. Not much, enough for
perhaps 20 cars. Ditto a small lot on Pinckney Island.
95 Same email as sent to the project email. Email Included 8 pages of further description from previous comment
96
I would strongly encourage you to incorporate into this project special bike/walking lanes. Currently the bridge is
shared by cars, bikers and even pedestrians and it would be beneficial to have better separation
and protection.
97
Against having an expressway through their residential, native community. Sites the difficulty getting out of her
driveway and suggests lower speed limits, traffic lights and more circles like the southern end of the island. If there is a
need to have a high-speed way, I would suggest that a high speed thoroughfare be connected to the bridge or the
Bluffton Parkway, travel over the waterway and connect to the Cross Island Expressway. This can be at a cost to the
travelers. Does not want increased lanes to manage traffic.
98 it is imperative to include bike lanes
99 In support of bike lanes; points to NWP that runs out of parking spaces during peak season but could accommodate
more bikes if there were a safe way to get there.
100 Has concerns about environmental impact of water pipes underneath current 278 struc ture
101 Note on behalf of the Fish & Wildlife Service in response to LOI
102 Comments on behalf of Savannah Riverkeeper about the NWR, Stoney Community, & Boat Ramp
60
26
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.7 LOCAL RESOLUTIONS
The resolutions listed below convey support for this project and corroborate that the current bridges along US 278 connecting to
Hilton Head Island are an impediment to citizens and visitors, a safety hazard (particularly during emergency evacuations) and
hinder economic activity and future development of the area. A full-size copy of each resolution is provided in Appendix A.
Beaufort County Council Resolution
61
27
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Lowcountry Area Transportation Study Policy Committee Resolution
62
28
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Town of Hilton Head Island Town Council Resolution
In addition, support for this project has been received by Henry McMaster, Governor of South Carolina, The City of
Beaufort, and the Town of Bluffton, as well as listed and prioritized in many long range and strategic plans. Appendix B
contains the signed letters of support received for the project to date. Appendix C contains a listing of existing plans where this
project is prioritized or referenced.
63
29
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.8 REGIONAL AND STATEWIDE SIGNIFICANCE
ENHANCEMENT OF MOBILITY AND SAFETY
Congestion Reduction
Studies have shown that congestion on urban road
networks cost the nation billions per year in longer
and less reliable journey times, reduced mobility,
increased vehicle operating costs, and environmental
degradation.15
Congestion results when traffic demand approac hes
or exceeds the available capacity of the roadway
system. Bottlenecks, signal timing, and traffic
incidents all contribute to congestion. Traffic
congestion varies daily along the US 278 bridges to
Hilton Head Island due to increased travel during peak
hours of morning and evening commute periods and
local school traffic. The summertime also sees
increased traffic congestion due to the large number
of tourists that visit the island each year.
The stretch of US 278 from Fording Island Road to Spanish Wel ls Road (roughly covering the project area) has seen a
steadily increasing annual average daily traffic count over the last ten years (an 18.5% increase from 2008 – 2018). This
section of the roadway has not been upgraded or improved to account for this ad ded traffic flow, while both adjoining ends of US
278 have been widened or additional routes have been provided . The impact of this is illustrated in Figure 1 . This bridge
replacement and congestion relief project will address the present traffic issues as well as allow for continued growth and economic
development for the region while also addressing structural concerns.
US 278 has been widened to six lanes, except the portion from Moss Creek Drive to Squire Pope Road, which remains a four-lane
section. This has created a bottleneck on both ends of the project area. Bottlenecks on the roadway account for 40% of all
traffic congestion with the next leading contributor, traffic incidents, at 25%. 16 Many of the traffic incidents that occur along this
section of US 278 are due to the bottleneck and congestion. This bottlenecking of the roadway presents a challenge for maintaining
flow rates along the corridor. Vehicles are forced to travel at lower speeds and either merge or allow others to merge into t he two
available lanes. The narrowing of the roadway chokes the traffic flow and limits the overall capacity of the highway. The widening
of these bridges into Hilton Head Island will allow all previous widened sections along US 278 and all added routes, like Blu ffton
Parkway, to operate in a complete, more efficient system.
With the bridges being only two lanes in each direction,
any traffic incident can delay traffic and cause
congestion long after the roadways have been cleared.
As compared to other arterial r outes with alternative
routes, this section of US 278 does not have any
alternative routes, meaning that any traffic incident or
congestion occurring along the bridge is much more
significant compared to other arterials that have
alternative routes. This widening project would provide
the expanded capacity needed to reduce this
congested section of roadway and deliver a more
efficient east-west corridor for the region.
15 Office of Economic and Strategic Analysis, U.S. Department of Transporta tion, Assessing the Full Costs of Congestion on Surface
Transportation Systems and Reducing Them through Pricing, (2009)
16 SCDOT, South Carolina Strategic Corridors Plan, (2014)
FIGURE 1: The capacity at the bottleneck will dictate the capacity of the roadway.
Traffic cannot travel faster than the speed through the bottleneck.
IMAGE 7: CONGESTION LEADING UP TO
US 278 BRIDGES TO HILTON HEAD ISLAND
Capacity = 6 Vehicles
Capacity = 4 Vehicles
Capacity = 6 Vehicles
Throughput = 4 Vehicles
64
30
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Strategic Freight Network
US 278 is listed as part of the Strategic
Statewide Freight Roadway Network in the
SCDOT South Carolina Statewide Freight Plan
(See Map 7). The Statewide Freight Roadway
Network identifies roadway networks that
provide through state and cross ‐regional
movement as well as connections to the nodes
of the network that include ports, airports and
inland freight facilities. These networks have
been identified as important to the flow of
goods. Preserving the Statewide Freight
Network assets is key to the success of the
state’s economy as these routes sustain the
reliability and efficiency of the goods
movement network in South Carolina. The
deteriorating bridge conditions, traffic
congestion, and bottlenecks that occur on US
278 impact the reliabili ty and resilie ncy of this
system,17 increasing costs to freight carriers
and consumers.
Improving the US 278 bridges as listed in this application represents tangible progress towards 10 of the 11 state freight
objectives listed in the SCDOT 2018 State Freight Plan17 (Table 4. The state’s goals align with the National Freight Goals
required in Fixing America's Surface Transportation Act (FAST Act).
TABLE 4: SCDOT GOALS & OBJECTIVES (EXCERPT FROM 2018 STATE FREIGHT PLAN17)
OBJECTIVES: ACHIEVED BY
THIS PROJECT
STATE GOAL: MOBILITY AND SYSTEM RELIABILITY | NATIONAL GOAL: ECONOMIC COMPETITIVENESS
Reduce the number of system miles at unacceptable congestion levels. ✔
Improve travel time reliability (on priority corridors or congested corridors). ✔
Reduce congestion on the freight transportation system. ✔
Improve the year‐round reliability of freight transportation on the interstate system. ✔
STATE GOAL: SAFETY | NATIONAL GOAL: SAFETY, SECURITY, RESILIENCY / ADVANCED TECHNOLOGY
Improve the safety, security, and resilience of the freight transportation system. ✔
Improve substandard roadways. ✔
Enhance truck parking availability and information management on SC interstates/South Carolina Freight Network. -
STATE GOAL: INFRASTRUCTURE CONDITION | NATIONAL GOAL: STATE OF GOOD REPAIR
Maintain or improve the current state of good repair for the National Highway Service (NHS). ✔
Reduce the percentage of remaining state highway miles (non-interstate/strategic corridors) moving from a
“fair” to a “very poor” rating while maintaining or increasing the % of miles rates as “good”. ✔
Improve the condition of the state highway system bridges. ✔
STATE GOAL: ECONOMIC AND COMMUNITY VITALITY
NATIONAL GOAL: ECONOMIC COMPETITIVENESS / ECONOMIC EFFICIENCY
Utilize the existing transportation system to facilitate enhanced freight movement to support a growing economy. ✔
17 SCDOT, South Carolina Statewide Freight Plan, (2018)
MAP 7: ROADWAY FREIGHT NETWORK
65
31
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
REGIONAL ECONOMY IMPACTS
Access between Hilton Head Island and the mainland is critical to economic vitality and sustaining local, regional, and statewide
economies. The congestion and delay produced by this stretch of US 278 is a crucial interruption in a transportation network that
Beaufort County and the region rely on for the movement of goods and people.
Improving the bridges to alleviate congestion will provide a mechanism for long term economic competitiveness by:
• Improving long term transportation efficiency and reliability for the movement of people and goods
• Improving access between employment centers, job opportunities, and workforces
• Increasing the economic productivity of labor (the fewer hours employees spend commuting will result in higher
productivity at their jobs)
• Supporting long term job creation
Tourism is a critical source of revenue and employment for South Carolina as it generates $21.2 billion annually and supports one
in every ten jobs in the state. 18 Tourists contribute to sales, profits, jobs, tax revenues, and personal income. According to a 2017
study, over 3,020,000 tourists visit Beaufort County each year. In 2016, tourism in Beaufort County was estimated to contribute an
economic impact (output) of approximately $1.53 billion within the County. This is approximately 7% of all of the to urism industry
in South Carolina.14 Having a robust and efficient transportation system is a cornerstone to at tracting and sustaining tourism and
the economic impacts that it brings. Tourism related revenues can provide alternative sources of revenues for local governments
to support visitors and the local population. This revenue can also be used as a tool to off set increasing local taxes or placing the
burden on residents. Improving the US 278 corridor to Hilton Head Island is crucial to maintaining the tourism industry flourishing
in Beaufort County, particularly on Hilton Head Island.
As areas in Beaufort Cou nty, such as Hilton Head Island and Bluffton, continue to experience population growth and increasing
visitors, the local governments will depend on tourism as an economic driver. As popularity and travel grow, the efficiency o f the
highways and roadways become even more essential to the economic preservation of the area. The mobility of the region allows
for the proper flow of tourists, goods, and the necessary transportation system for the labor force. US 278 must be improved to
provide Beaufort County with an efficient transportation system to support its booming tourism industry.
Economic Impact of Tourism
Hilton Head Island is home to over 24 public and private championship golf courses, 12 miles of pristine beaches, 250 restaurants,
and hundreds of oth er amenities that make the island one of the most visited places in South Carolina. 19 Tourism continues to
grow in Beaufort County, bringing positive economic impacts, but also putting increased pressure on the transportation networ k.
The US 278 bridges to Hilton Head Island are part of the critical transportation network necessary to support a bustling to urism
economy. Investing in and improving these bridges will increase the efficiency of the transportation network and increase the
mobility of people, goo ds, and services necessary to preserve the flourishing tourism industry and associated economic impac ts
felt across the region.
Tourism is a major economic engine that not only fuels Beaufort County, but also provides positive economic impacts for the region
and the state. Tourism is a $21.2 billion industry in South Carolina and supports one in every 10 jobs in the state. In 2015,
the U.S. Travel Association estimated that spending on travel or on behalf of tourism in South Carolina totaled $21.2 billion in 2016.
This represents a 4.7% increase from 2015.20
According to a 2017 study, over 3,020,000 tourists visit Beaufort County each year. In 2016, tourism in Beaufort County was
estimated to contribute an economic impact (output) of approximately $1.53 billion within the County . Tourist spending
generated a positive impact on net revenues to local governments in Beaufort County of approximately $15 million; this does not
include revenues generated by state and local accommodations tax and local hospitality taxes. The estimates output multiplier for
total tourist spending for Beaufort County was 1.40, meaning that every dollar spent by tourists in Beaufort County increases output
in the County’s economy by a total of $1.40. 14 This impact is important for local governmen ts to help lessen the tax burden on
residents by providing a supplement (or alternative) revenue stream.
18 South Carolina Department of Parks, Recreation, and Tourism, Fiscal Year 2017-18 Accountability Report, (2018)
19 Hilton Head Island Visitor and Convention Bureau, Explore Hilton Head Island, SC. https://www.explorehiltonhead.com/, accessed on August
8, 2018
66
32
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Not only are tourists arriving to and traveling around Hilton Head Island by personal vehicle, but bicycle tourism also accounts for
a noteworthy po rtion of the economic impacts of tourism. Regional Transactions Concepts, LLC estimated that bicycle tourism
contributed approximately $12 million in 2017 to the total tourist expennditures on Hilton Head Island.14 This number accounts only
for biking related expeditures and does not include other associated bicycle tourism impacts on service industries such as dining
and lodging.
Workforce Deficit
In 2016, Beaufort County supplied over 13,800 direct tourism j obs (increased by 300 jobs since 2015). Beaufo rt County supplies
the 3rd highest number of tourism jobs in the state. In 2016 it was estimated that there were 17,208 jobs that comprise the estimated
total employment impact generated by tourists in Beaufort County, meaning tourism jobs accounted for 16 .5% of all jobs in
Beaufort County in 2016.20
Even though the tourism industry is booming across Beaufort County and Hilton Head Island some business owners in the resort
and hospitality industries are struggling to find workers to fill open positions. A newspaper article from May 24, 2017 by the Island
Packet21 documented that job fairs hosted by the South Carolina Restaurant and Lodging Association on Hilton Head Island
attracted dozens of employers, but few job seekers. According to the article, some of the workforce deficit can be attributed to new
E-Verify requirements for legal workers, but business owners also cited the traffic delays and difficulties traveling to and fr om the
Island using the US 278 bridges as a cause for workers not being able to access jobs on the Island.
Most of the resort and hospitality workers do not live on Hilton Head Island. The lack of affordable housing on the Island me ans
that many workers must commute from other areas to reach their places of employment on the Island. Acc ording to the U.S.
Census Bureau, Center for Economic Studies it is estimated that in 2015 there were a total of 20,636 people employed on Hilto n
Head Island. Of the total number of people employed on the islan d, 12,693 people (61.5%) commuted to the Hilton Head
Island daily from other areas. An estimated 5,398 people live on Hilton Head Island but commute off the island daily for their
jobs. Additionally, it is estimated that there were 7,943 people that both lived and worked on Hilton Head Island.22
Palmetto Breeze offers public transportation service from inland areas to Hilton Head Island. Many Island employees use this
public transit service riding from Allendale, Colleton, Hampton and Jasper Counties, and elsewhere in Beaufort County to Hilton
Head Island. Allendale riders, as an example, face a 1.5-hour commute (approximately 76 miles) to travel between their homes in
Allendale, SC to commute to their jobs on Hilton Head Island. The delays along the commute are often attributed to congestion
caused by the bottlenecks of the US 278 bridges. Improving the bridges to alleviate congestion would increase traffic flow making
20 U.S. Travel Association, The Economic Impact of Travel on South Carolina Counties 2016 (2017).
21 The Island Packet, Workforce Crisis: At Hilton Head Job Fair, Employers Far Outnumber Job Seekers, Article by Teresa Moss,
https://islandpacket.com/news/business/article152191112.html, accessed on August 8, 2018
22 U.S. Census Bureau, Center for Economic Studies, Inflow/Outflow Analysis (2015)
IMAGE 8: PALMETTO BREEZE PUBLIC TRANSPORTATION SERVICE
67
33
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
it easier and faster to commute on and off the Island. Making access to the Island easier will encourage more workers to apply for
jobs on the Island, eliminating some workforce deficit.
INCREASE IN THE QUALITY OF LIFE AND GENERAL WELFARE OF THE PUBLIC
Population Growth
The region has developed significantly with new residents moving in regul arly, making Beaufort County the 7th fast est growing
county in South Carolina. Both the Hilton Head Island-Bluffton-Beaufort MSA and Beaufort County’s growth rates are projected to
be higher than the overall growth rate of the state. According to population projections by the South Carolina Revenue and Fiscal
Affairs Office and as illustrated in Chart 9: Population Growth Rate, by 2030 the population of Beaufort County is anticipated
to grow by approximately 33%, Hilton Head Island -Bluffton-Beaufort MSA will grow by approximately 21%, and the sta te
of South Carolina will grow by about 19%.
The transportation system needs to support the increasing residential population, additionally it must account for the daily influx of
commuters and visitors. According to the Beaufort County Comprehensive P lan, tourists, visitors, seasonal residents, and daily
commuters increase the County’s population by an additional 34% on an average day. 23
23 Beaufort County, Beaufort County Comprehensive Plan, (2010)
0
50,000
100,000
150,000
200,000
250,000
300,000
2000 2010 2018 2020
(Projected)
2025
(Projected)
2030
(Projected)
CHART 8: PROJECT POPULATION GROWTH
Beaufort County Hilton Head Island-Bluffton-Beaufort MSA
*Information based on population projections provided by the South Carolina Revenue and Fiscal Affairs
Office and S.C. Department of Employment and Workforce Community Profile
4.5%
18.5%
8.1%
32.9%
8.3%
20.6%
0%
5%
10%
15%
20%
25%
30%
35%
Growth Rate 2010 -2018 Projected Growth Rate 2018 -2030
CHART 9: POPULATION GROWTH RATE
South Carolina Beaufort County Hilton Head Island-Bluffton-Beaufort MSA
68
34
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Air and Environmental Effects
Traffic congestion contributes to a reduc tion in local and regional air quality. When vehicles travel at the posted speed limits they
function more efficiently. When vehicles travel through cong ested corridors there is an increased amount of stop -and-go actions,
which can decrease fuel efficiency and increase air pollution produced by vehicles. Improving congestion along this corridor could
lead to improved air quality for the region and increased quality of life for residents and visitors.
Enhanced Bicycle and Pedestrian Networks
Improving the multimodal connections along the US 278
bridges to Hilton Head Island would mean improved safety
for pedestrians and bicyclists traveling through the
corridor. This project will evaluate all options to improve the
multimodal connections throughout the corridor.
Beaufort County and Hilton Head Island provide an extensive
bicycle and pedestrian transportation and recreation network.
Bicycling and walking are not only modes of transportation ,
but they can be forms of recreation and improve an
individual’s ove rall health and well -being. A study from the
American Journal of Public Health found that when an
environment is more walkable and bikeable, the obesity rates
are lower, and a larger perc entage of adults achieve the
recommended level of physical activity.24
With such a large percentage of Hilton Head Island’s workforce commuting into the island from over the bridge, a non -motorized
transportation alternative could improve the health of the region as well as reduce congestion on the roadway. As the US 278
Corridor Improvement Project aims to decrease traffic congestion,
multi-modal transportation options will also be considered to remove
some of the congestion by replacing vehicle trips with bicycle or
pedestrian trips. Improving connectivity over the bridge could create
a potential for new bicycle shops , hotels, and restaurants in the
region. This could have a beneficial impact on the mainland’s
economic development and physical health of the population.
Hilton Head Island is recognized as a Gold Level B icycle Friendly
Community by the American League of Bicyclists, giving the
designation as one of the top bicycle-friendly communities in the
United States.25 Hilton Head Island is one of only three Gold Level
Communities in the Southeast and only one of four on the East
Coast to receive this designation. The Gold Level distinction
recognizes the Town's commitment to improving conditions for
bicycling through its investment in bicycling promotion, education
programs, infrastructure and pro-bicycling policies.
24 The U.S. Department of Transportation – Safer People, Safer Streets: Pedestrian and Bicycle Safety Initiative
25 The League of American Bicyclists, Bicycle Friendly State ranking, and summary list of Bi cycle Friendly Communities, Businesses, and
Universities within the state. https://bikeleague.org/bfa/awards#community, accessed on June 13, 2019
HILTON HEAD ISLAND
BICYCLE FACTS:
The island is only 12 miles long and five
miles wide but there are:
▪ 1 mile of bike lanes
▪ 120 miles of shared-use paths
• 64 miles paved public paths
▪ 8 miles of planned pathways
▪ 2 miles of single track
▪ 24% of arterial streets have bikes lanes
or paved shoulders
IMAGE 9: TOURIST BIKE RENTAL COMPANIES
Source: Explore Hilton Head Island
69
35
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
The Island provides a bicycle network of over 108 miles of multiuse paths for people to enjoy by bicycle or on foot 26 (see MAP 8:
PUBLIC PATHWAYS MAP TOWN OF HILTON HEAD (2015).
Hilton Head Island supports a bicycle culture that can be felt across the community and numerous bicycle shops and hotels across
the Island. The 35 bicycle shops and hotels provide a combined 25,000 bicycles that may be rented any day of the week.
Hilton Head Island provides 30 Pathway Kiosks featuring maps, biking brochures, and biking do’s and don’ts videos for out of town
guests and visitors. Hilton Head Island has even developed its own bicycling app, Island Compass, which includes information for
biking around the Island.
As shown in MAP 8: PUBLIC PATHWAYS MAP TOWN OF HILT ON HEAD (2015), there are no bicycle lanes or pathways
along US 278 to connect Hilton Head Island to the mainland. A pathway across Jenkins Island will be considered to tie into the
US 278 bridges. This potential future connection across Jenkins Island and the bridges could provide bicycle access from Hilton
Head Island to the mainland as well as the 7.7-mile Pinckney Island Ride Trail on the Pinckney Island National Wildlife Refuge.
26 Hilton Head Island-Bluffton Chamber of Commerce & Visitor and Convention Bureau, Biking on Hilton Head Island, Explore Hilton Head Island,
SC. https://www.hiltonheadisland.org/see-do/biking/biking-hilton-head-island, accessed on October 24, 2018.
MAP 8: PUBLIC PATHWAYS MAP
TOWN OF HILTON HEAD (2015)
70
36
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Bluffton Parkway is paralleled by a shared use
path which currently stretches between
Buckwalter Parkway and Buckingham Plantation
Road, ending approximately 1,500 feet before
the Bluffton Parkway flyover ramps connecting to
the US 278 bridges to Hilton Head Island. There
is also a shared use path along US 278 on Hilton
Head Island, beginning at the intersection of US
278 and Gumtree Rd and continuing east along
US 278 connecting into Hilton Head Island’s
extensive pathway network.
As shown in Map 9: Existing Bicycle Network,
the missing link in the bicycle network is from the
end of the Bluffton Parkway shared use path at
Buckingham Plantation Road across the US 278
bridges to the intersection of US 278 and
Gumtree Rd on Hilton Head Island. Creatin g a
bicycle connection across this portion of US 278
could provide the missing link in the network and
offer an alternative mode of transportation
between Hilton Head Island and the mainland.
A bicycle connection along the US 278 bridges is supported in multiple area planning documents. The Town of HHI Comprehensive
Plan (2017) Goal 6.3-D is “To have a pathway network that provides for recreational opportunities as well as an alternative means
of transportation to and on the Island.” On page 88 of the pla n, Implementation Strategy 6.3-D is to “Coordinate with SCDOT and
Beaufort County to provide a pathway link to the mainland.” The 2010 Beaufort County Comprehensive Plan contains a map from
the Trails and Blueways Master Plan, which recommends adding a tra il along the US 278 bridges. 27 The 2040 Lowcountry Area
Transportation Study (LA TS) Long Range Transportation Plan recommends a future roadway improvement over the bridges to
include 10’ outside paved shoulders as shown in Figure 2.28 Wide shoulders are usef ul not only for bicycle access but also for
emergency vehicle access and improved evacuation capacity.
Multimodal transportation improvements will be considered in the US 278 Bridges to Hilton Heads Island Project. Regardless of
the type of bicycle and pedestrian accommodations, any improvements to the non-motorized connections across the US 278
bridges will:
• Enhance non-motorized transportation alternatives
• Improve the appeal of the Island to visitors
• Improve bicycle, pedestrian and driver safety
27 Beaufort County, Beaufort County Comprehensive Plan – Appendix 10 A - Trails and Blueways Master Plan, (2010)
28 Lowcountry Council of Governments, The 2040 Lowcountry Area Transportation Study (LATS) Long Range Transportation Plan, (2015)
FIGURE 2: US 278 Bridge Widening - Recommended Future Roadway Cross-Section32
Source: 2040 Lowcountry Area Transportation Study (LATS) Long Range Transportation Plan
MAP 9: EXISTING BICYCLE NETWORK
71
37
Beaufort County - US 278 Corridor Improvement Project
HURRICANE EVACUATION
In the event of a mandatory evacuation of an area, congest ion and delays are expected and unavoidable on the roadways. With
each evacuation event, Beaufort County analyzes the efficiency of their roadway network and works to identify regions or areas
where congestion and delays are at unacceptable levels. These evaluations are based on actual evacuations. Improvements to
Beaufort County’s evacuation system over the past few years include the Bluffton Parkway project and the widening of Okatie
Highway (SC 170). The remaining piece to this upgrade of the evacuation network is the widening of the US 278 bridges to Hilton
Head Island, an area at higher risk of evacuation events.
There are 32 American Red Cross shelter locations within the 46 counties in South Carolina where hurricane evacuees can seek
safety. While temporary shelters are available during smaller scale storms, Beaufort County has no shelters for its residents for
any Category 1 or greater hurricanes. In the event of an evacuation, the near est location would be the sole shelter in Jasper
County.29 Due to the low elevations of the Lowcountry , the coastal barrier islands of Jasper, Beaufort, Colleton, and Charleston
Counties are typically the first to require evacuation. When Hurricane Irma hit South Carolina in 2017, these islands had to be
vacated, affecting 44,457 residents. Of this number, 42,000 evacuees were from Hilton Head Island.30
Several other threatening hurricanes have hit South Carolina in the past years, including Hurricane Joaquin in 2015 which caused
intense flooding and Hurricane Matthew in 2016 that brought immense economic impacts throughout the South.
29 The American Red Cross, Red Cross Supporting Evacuation Shelters in South Carolina, (2016)
30 The Post and Courier – 44,457 South Carolina Residents Impacted by Evacuations in Response Hurricane Irma, (2017)
IMAGE 10: TRAFFIC INTENSIFIES DURING THE MANDATORY EVACUATION DUE TO IMPENDING HURRICANE. Source: https://www.longroom.com
72
38
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Evacuation Zones
South Carolina’s 2018 Critical Need Transportation Operations Plan evaluated the state’s elevations and assigned evacuation
zones based on the projected surges that woul d affect the areas. Evacuation Zone A represents the most vulnerable locations of
each county. Beaufort County is the only county in the state that is entirely comprised of Zone A (as shown in Image 11).31 With
this susceptibility, the county’s hurricane evacuation routes must be as efficient and functional as possible. This 2018 Operations
Plan found that the time it takes to execute an evacuation is based on multiple variables which include the coasta l county at risk,
the category of storm, time of year, and time of day that the evacuation commences.29 The state is divided into four conglomerates:
northern, western, central, and southern. In the event of an evacuation , the southern conglomerate , which includes Beaufort,
Jasper, Colleton, and Hampton County could take up to 24 hours to fully vacate.29
While the completion of the Bluffton Parkway provided an alternative evacuation route from east to west and the widening of US
170 and parts of US 278 decreased delays in the Bluffton and Beaufort area, it did not solve the problem entirely. The US 278
bridges that all Hilton Head Islands’ residents, employees, and tourists must cross to leave the island are only 4 lanes total, creating
massive delays as the road bottlenecks . This stretch of US 278 from Moss Cre ek Drive to Squire Pope Road is the only
remaining 4-lane portion of the roadway. In an emergency event, Hilton Head Island residents face extreme traffic conditions
before they can reach the widened portion of US 278 or Bluffton Parkway. With the population steadily growing on the island and
storm frequency and severity increasing, the issue worsens each year.
31 South Carolina Emergency Management Division, State of South Carolina Critical Transportation Need Evacuation Operations Plan, (2018)
IMAGE 11: ALL OF BEAUFORT COUNTY IS CLASSIFIED AS EVACUATION ZONE A, MAKING ALL RESIDENTS IN BEAUFORT COUNTY
VULNERABLE TO A HURRICANE REGARDLESS OF THE MAGNITUDE.29
73
39
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Evacuation Routes
The need to improve evacuation routes and
decrease evacuation times is critically important to
the areas that are experiencing growth and are
subject to constant storm threats. After Hurricane
Matthew made landfall in 2016, South Carolina
reevaluated their evacuation plans and incorporated
several new operational methods including the use of
school buses as the primary mean for Critical
Transportation Needs (CTN) evacuees.29
While South Carolina is using their lessons learned
to improve the evacuation process, the changes that
are in discussion and implementation will likely not
significantly change the evacuation times from Hilton
Head Island due to the bottleneck at the bridges. This
narrowing of US 278 will continuously present
serious delays unless the roadway is widened.
Increasing the capacity of the road, such as widening the bridges will allow for continuous, constant flow of traffic off the island and
eradicate the largest cause of evacuation delay in the area.
To keep up with the island’s growing population, the worsening structural state of the bridge and the intensifying threat of
hurricanes, the bridges into Hilton Head Island must be improved and the capacity increased. The goals of this project will complete
the transformation of the county’s roadway network into an efficient and appropriate evacuation route.
IMAGE 12: HURRICANE IRMA APPROACHES FLORIDA AND SOUTH CAROLINA IN
2017 WITH MAXIMUM SUSTAINED WINDS AT 155 MPH.
Source: NASA Hurricanes – Geo-color Image of Hurricane Irma 2017
MAP 10: HURRICANE EVACUATION ROUTES IN BEAUFORT COUNTY
74
40
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Storm Surges
Recent studies have found that the climate change is
producing more destructive and powerful hurricanes.
As sea levels rise globally, storm surge levels will
likely increase in magnitude and frequency . The
rainfall rates produ ced by a hurricane will
increase by 10 -15% and t he intensities of these
storms will heighten by 1 -10% in the Atlantic
Basin.32 The rise in storm surge level is particularly
alarming for Beaufort County due to the low
elevation. A category 3 storm currently produces a
storm surge of 9 -12 feet in southeast South
Carolina,32 which would flood almost all of Hilton
Head Island and much of the mainland of Beaufort
County (See MAP 11). Beaufort County cannot afford
having a poorly functioning evacuation route with i ts
extreme vulnerability to storm surge levels. Because
this study also found that there will be more frequent
occurrences of intense storms, there will also be
more strain on the already structurally deficient
bridge as evacuations become more frequent . This
intensification of the regio n’s hurricanes will cause
further destruction and need for evacuation in the
future.
South Carolina Emergency Management Division
(SCEMD) has estimated the Hurricane Evacuation
Clearance Times for 2018 as illustrated in Table 5.
The 2018 clearance times were estimated using the
increase in population ( 15% increase, as estimated
by ESRI Business ) in the evacuation zones of
Beaufort County from 2010 to 2018. The population
increase was then applied to the clearance times that
were developed for the 2013 Hurricane Evacuation
Study (HES).
32 NOAA, Geophysical Fluid Dynamics Laboratory: Global Warming and Hurricanes, https://www.gfdl.noaa.gov/global-warming-and-hurricanes/,
accessed on June 17,2019
Hurricane Category &
Evacuation Response
Southern Normal Lane Use
Occupancy
Low High
CATEGORY 1 – 2
Rapid 8 (9) 13 (15)
Medium 11 (13) 15 (17)
Slow 13 (15) 18 (21)
CATEGORY 3 - 5
Rapid 14 (16) 19 (22)
Medium 17 (20) 22 (25)
Slow 19 (22) 24 (28)
(#) factors in the population increase between 2010 and 2018
MAP 11: HURRICANE STORM SURGE AREAS
TOWN OF HILTON HEAD ISLAND
TABLE 5: BEAUFORT COUNTY INTERIM HURRICANE
EVACUATION TIMES (HOURS)
75
41
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.9 PROS AND CONS OF ALL ALTERNATIVE TRANSPORTATION PLANS TO THE PROJECT
SCDOT evaluated a range of alternative transportation plans for this project corridor, seven are currently being carried forward as
reasonable alternatives . The se remaining seven alternat ives will be further reviewed and refined, with a proposed preferred
alternative to be determined after a Public Hearing. Chart 10 illustrates the range of alternatives that have been considered and
the remaining process that will determine the final proposed preferred alternative.
SCDOT used the following evaluation criteria to evaluate the pros and cons o f each of the original alternatives, this led to the
identification of the remaining seven alternatives:
• Structural Deficiencies: This criterion evaluat es whether the alternative address es the structural deficiencies along
eastbound US 278 (bridge over Mackay Creek)
• Wetlands: Freshwater and critical area wetlands, as defined through GIS mapping, were identified based on the total
area of potential impact by the alternatives
• Right-of-Way: A review of the total acreage of right -of-way impacted as well as the number of individual tracts was
evaluated per alternative.
• Neighborhoods: The total number of neighborhoods anticipated to be impacted was evaluated for each alternative
• Protected Lands: Each alternative was evaluated to determine if protected lands were i mpacted as well as the total
acreage and number of individual tracts.
• Pickney National Wildlife Refuge Compatibility: Each alternative was evaluated to determine if it was compatible with the
Pickney National Wildlife Refuge.
CHART10: ALTERNATIVES DEVELOPMENT FLOWCHART
76
42
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.10 ENVIRONMENTAL IMPACTS OF PROJECT
Lying along the Intracoastal Waterway, Hilton Head Island encompasses 42 square miles of semi -tropical geography. The
geography surrounding the project area includes barrier islands with constantly changing ecosystems, wetlands, salt marshe s,
tidal creeks, forestland, brushland, freshwater ponds, and uncultivated fields. The area is home to a variety of wildlife inc luding
deer, alligators, loggerhead sea turtles, manatees, dolphins, and hundreds of species of birds. Currently this project is 40%
through the Environmental Assessment (EA) process for this project and will have preliminary alternatives developed by
Fall 2019
The entrance to Pinckney Island National Wildlife Refuge (NWR) is located between the Karl Bowers Bridge and the J. Wilto n
Graves Bridge. The 4,053-acre refuge was established in December 4, 1975. The island was once part of a plantation owned by
Major General Charles Cotesworth Pinckney; a prominent lawyer active in South Carolina politics from 1801 to 1815. Few traces
of the island's plantation exist today, as most of the Island has been returned to its natural form. 33
The environmental features are part of the attraction for tourists visiting Hilton Head Island. This project aims to improve access to
Pinckney Island and m inimize environmental impacts from roadway improvements. Map 1 2 illustrates some of the known
environmental features located within the project area. As shown in the map, the project is located wit hin the vicinity of wetlands,
refuge areas, and threatened and endangered species (including plants and animals). The map also shows the NEPA Study Area,
during NEPA investigations more detailed environmental impacts and mitigation opportunities will be de termined.
EXPECTED LEVEL OF NECESSARY ENVIRONMENTAL DOCUMENT
The expected level of Environmental Document is a Finding of No Significant Impact (FONSI), which is anticipated to be
approved by early 2021. It is anticipated that a US Army Corps permit will be required. In addition, it is anticipated that the
following permits will also be required:
• US Army Corps of Engineers
• US Coast Guard
• South Carolina Department of Health and Environmental Control (DHEC)
33 U.S. Fish & Wildlife Service, Pinckney Island – About the Refuge. Department of the Interior, Jan. 6, 2015.
https://www.fws.gov/refuge/Pinckney_Island/about.html, Accessed: August 14, 2018
IMAGE 13: PINCKNEY ISLAND NATIONAL WILDLIFE REFUGE ENTRANCE
77
43
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
MAP 12: ENVIRONMENTAL FEATURES & NEPA STUDY AREA
78
44
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.11 EVENTS/MILESTONES TO IMPLEMENT PHASES OF PROJECT
This application is being submitted upon the passing of the Beaufort County Special Transportation Sales and Use Tax. The project
is currently going through the Environmental Documentation and NEPA Compliance process which will conclude in 2020.
The FONSI will be approved by FWHA in early 2021. The US Army Corps of Engineers permit approval and the US Coast Guard
permit approval are both anticipated by 2022.The Preliminary Design and Concept Studies is currently underway and will conclude
in 2020. Right-of-Way Acquisition is anticipated to begin in 2021 and be completed in 2023. The construction bid date is in 2023
with a 4-year construction duration beginning in 2023 and concluding in 2027, with the pro ject opening to the public in 2027.
4.12 CURRENT STATUS OF THE PROJECT
SCDOT is moving the project through the planning phase with an environmental assessment (EA). The goal is acquiring right-of-
way and building the selected preferred alt ernative. In association with FHWA and Beaufort C ounty, SCDOT will develop the EA,
a process that will include reviewing alternatives and comparing the beneficial and negative impacts on the natural and human
environments. Efforts will be focused on community involvement and communication to ensure the successful development of the
environmental process.
During the Alternative Development Process a range of alternatives will be considered and evaluated, including the no-build option,
mass transit, high-occupancy vehicle lanes, and ridesharing. The alternatives analysis will explain how alternatives were evaluated
and why each alternative was eliminated from consideration. The range of alternatives, reasonable alternatives, and results of the
analysis will be presented and available for comment in the fall of 2019.
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Environmental Documentation and NEPA Compliance
FONSI Approval
US Army Corps of Engineers Permit Approval
US Coast Guard Permit Approval
Preliminary Design and Concept Studies
Right-of-Way Acquisition
Construction
Project Open to the Public
CHART 11 : MAJOR PROJECT EVENTS AND MILESTONES
79
45
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
4.13 ENTITY STATEMENT AGREEING TO RESPONSIBILITIES
4.14 PROJECT SCORE
The SIB Criteria states that “the ranking and scoring is done as part of the program categories Long Range Plan.” In addition, SC
Code Section 57-1-370(B)(8) states that the project shall be “taking into consideration at least the following criteria:
a. financial viability including a life cycle analysis of e stimated maintenance and repair costs over the expected life of the
project;
b. public safety;
c. potential for economic development;
d. traffic volume and congestion;
e. truck traffic;
f. the pavement quality index;
g. environmental impact;
h. alternative transportation solutions; and
i. consistency with local land use plans.”
This project has met each of these criteria and is listed in the priority list by SCDOT as well as being the number one priority in the
LATS MPO. Through the LATS MPO criterion scoring of projects, this pr oject, identified as the number one priority, has a score
of 74. An explanation of the LATS MPO scoring is in Appendix D.
Based on the provided criteria for Public Benefit, as well as identifying that these improvements are part of both the National
Highway System and the State Freight Network , the resulting score is a 74/100 which equals 37 points x 1.1=40.7. As the
maximum number of points within the Public Benefit section is capped at 50, this project scores 40.7 points for the Public
Benefit criteria.
4.15 CONSULTATION WITH THE DEPARTMENT OF COMMERCE
Not applicable. The South Carolina Transportation Infrastructure Bank (the Bank) criteria states: “Consultation with the Department
of Commerce is recommended for guidance in scoring when submitting a projec t that supports Economic Development for the
State. The prioritization scoring scale for a project with this purpose would use a 0 -100% scoring scale based on the Department
of Commerce scoring criteria.” This project is not an Economic Development project.
TABLE 6: ACTIVITIES & RESPONSIBLE ENTITIES
ACTIVITIES & RESPONSIBLE ENTITIES
ACTIVITY RESPONSIBLE
ENTITY CONTACT NAME ADDRESS PHONE
Environmental
Studies SCDOT Craig Winn 955 Park Street, Room 401
Columbia, SC 29202-0191 (803) 737-6376
Design of Project SCDOT Craig Winn 955 Park Street, Room 401
Columbia, SC 29202-0191 (803) 737-6376
Rights of Way
Acquisition SCDOT Mark Westbury PO BOX 308, 858 Highway 15
North, St. George, SC 29477 (843) 636-9681
Construction SCDOT Toby Wickenhoefer 6355 Fain Boulevard, North
Charleston, SC 29406 (843) 746-6734
Construction
Management SCDOT Toby Wickenhoefer 6355 Fain Boulevard, North
Charleston, SC 29406 (843) 746-6734
Operation SCDOT Josh Johnson 6355 Fain Boulevard, North
Charleston, SC 29406 (803) 602-4415
Maintenance SCDOT Michael Black 6355 Fain Boulevard, North
Charleston, SC 29406 (843) 746-6715
Contract documents will be available upon request once finalized and signed.
80
46
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
V. FINANCIAL PLAN
5.1 TOTAL PROJECT COST
The total cost of the US 278 Corridor Improvement Project is $246 million.
This cost estimate was provided by SCDOT Project Manager Craig Winn on October 12, 2018 as part of the US 278 Corridor
Improvements project (www.scdot278corridor.com).
Expense Categories Estimated Amount
Preliminary Engineering through Construction Plans (10% of Construction Costs) $18,200,000
Environmental Permitting and Mitigation $10,000,000
Right-of-Way (to be obtained) $2,000,000
Utility Relocations $10,000,000
Total Construction Cost* $205,800,000
Total Project Cost $246,000,000
Local Obligations Contingency** $26,370,112**
Total Project Risk $272,370,112
* Total Construction Cost includes General Mitigation, 15% Inflation Cost, 13% CEI and Contingency. SCDOT contributions are
limited and 66.7% of the work will be funded by Beaufort County, with all associated risks of project delivery.
**The local obligations contingency is not included within the total project cost at this time, however, elements such as Bridge
Foundation Contingency, Portland Cement Index (FHWA Technical Advisory T 5080.3), Steel, and additional right -of-way are all
included within the total project risk.
5.2 PROJECT WITH TOTAL COST: IN EXCESS OF $50 MILLION
This project is in excess of $50 million and will follow the guidelines as described in Section 5.2.a . requiring a local contribution of
at least 25% of the total project co sts with additional credit provided for the grant application for each additional 5% of local
contribution and non-Bank funding. The $246 million project, including project risk, is broken down as follows:
Based on the points calculation within Section 5.2.a, the following points are allocated for this project:
For a project over $50 million, the amount of local contribution must be at least 25%. With a $246 million project, 25% of the total
cost is $61.5 million. The Beaufort County one-cent tax provides $80 million specific to this project, thereby meeting the 25%
local fund commitment, and exceeding the match with an additional $18.5 million. Th is equates to 15.04 points.
The Beaufort County Road Impact Fees provide an additional $12.3 million equating to an additional 10 points.
Per Section 5.24, the additional elements as noted in Table 8 provide an additional local match / non-Bank funded amount of $60.1
million. This equates to 24.42 points.
The committed funds in both local match as well as non -Bank funds result in a total score of 49.46 points of the available 50
points.
TABLE 8: AMOUNT OF LOCAL CONTRIBUTIONS
FUNDING SOURCE AMOUNT
Beaufort County one-cent tax referendum, as approved by the voters on November 6, 2018 $80,000,000
Beaufort County Road Impact Fees $12,300,000
Per Section 5.25
Federal Guideshare / Local money for the Environmental Assessment/Preliminary Engineering $4,200,000
SCDOT Bridge Replacement Funds $43,521,112
Beaufort County Funds for Jenkins Island Work $9,000,000
Town of Hilton Head Island Right-of-Way Dedication $3,350,000
Total Local / Non-Bank Funded Match including Project Risk (see Table 7) $152,370,112
SCIB Grant Request $120,000,000
Total Project Risk $272,370,112
TABLE 7: TOTAL PROJECT COST EXPENSE CATEGORIES
81
47
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
5.3 SOURCE OF LOCAL CONTRIBUTION
Beaufort County voters have passed a 1 % local sales tax that will generate $80 million for the US 278 Bridge Corridor
Improvement project to Hilton Head Island as part of this project. This tax was passed under the South Carolina Code of Laws
Title 4 – Counties, Chapter 37 Optional Methods for Financing Transportation Facilities §4-37-30. The tax will generate a total of
$120 million which will be used on transportation projects across Beaufort County. The additional funds generated from this t ax
will include $10 million for sidewalk and pathway improvements, $30 million for traffic improvements on US 21 across Lady's Island,
and $80 million committed to the US 278 Bridge Improvement project. The key attributes of the transportation sales tax cite that
the funds are to be used for a clearly delineated list of projects, the tax is for a fixed period, and the tax is for a fixed dollar amount
of revenue to be generated. The sales tax approved by the voters of Beaufort County explicitly stated that the se funds would be
used for the project noted abov e, with $80 million for the US 278 bridge improvements, and would automatically sunset after 4
years or as soon as $120 million is generated. The sales tax cannot be put into effect again without voter approval.
Additional local matches and non-Bank funding is discussed in Section 5.2
5.4 AMOUNT OF ASSISTANCE REQUESTED FROM BANK
Beaufort County formally requests $120,000,000 from the South Carolina State Transportation Infrastructure Bank Board
to assist in the completion of the US 278 Corridor Improvement Project. This grant would represent 44.1% of the overall
project cost.
5.5 FORM OF ASSISTANCE REQUESTED
Beaufort County requests that the funding from the SIB be in the form of a $120,000,000 grant. The money generated from the
local match and the non-Bank funded sources previously described will provide the remaining 55.9% of the program’s costs.
5.6 OTHER PROPOSED SOURCES OF FUNDS
As listed above, Beaufort County has passed a local sales tax that will generate $80 million for traffic improvements on Hilton Head
Island as part of this project. The sales tax language, as approved, specifies the use of the funds and states:
“I approve a special transportation sales and use tax in the amount of one percent to be imposed in Beaufort County for no mo re
than 4 years, or until a total of $120 million dollars in resulting revenue has been collected, whichever comes first.” These
improvements are specific to traffic improvements on Hilton Head Island, traffic improvements on Lady’s Island, and sidewalk &
pathway improvements in Beaufort County.
As documented in the Capital Program, SCDOT is committed to funding $43.5 million to be used for replacing the eastbound span
of the Karl Bowers Bridge using bridge replacement funds. SCDOT’s statement regarding the commitment of these funds, as well
as the County’s letter requesting this statement, is in Appendix E.
5.7 ANTICIPATED SCHEDULE OF FUNDS DISBURSEMENT
The following represents the anticipated schedule of funds disbursement for the project to move forward. While the construction
is not anticipated for several years, the urgency of the grant application is to ensure that the project can continue to move
forward with necessary key next steps including completion of environmental review and documentation, design and
construction.
CHART 12: ESTIMATED CASH FLOW DIAGRAM
82
48
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
5.8 SCHEDULE OF PROJECT RECEIPT FOR LOCAL CONTRIBUTIONS
It is anticipated that the Beaufort County 1% local sales tax will generate approximately $2.5 million per month, $30 million per
year, for the life of the tax referendum (four years or until the total amount is $120 million; whichever comes first). This is the total
tax referendum amount , of which $80 million is committed to this project. The projection of receipt of local contributions is as
follows:
5.9 COMMITMENT TO FUTURE MAINTENANCE
US 278 is within the state owned and maintained network and, after improvements are completed, will remain within the state
owned and maintained highway network. Therefore, the future maintenance and responsibility of this roadway will be with SCDOT
and included within their annual maintenance and operational programming.
5.10 CONTINGENCY PLANS SHOULD THE BOARD APPROVE LESS THAN THE REQUESTED
FINANCIAL ASSISTANCE OR ACTUAL PROJECT COSTS EXCEED ESTIMATED PROJECT COSTS
The $246 million estimate that is currently being used was developed by SCDOT as an estimate of what a project of this size could
potentially cost based upon major structures cost and contingency.
Should the Board fail to approve the amount requested and/or the project costs exceed the current estimate, Beaufort County
would consider another referendum in 2020 for the project. In addition, we would work with SCDOT in order to identify other s tate
or federal grant programs such as BUILD Grants in order to fund this vital piece of infrastr ucture. Phasing of the project would be
difficult given the topography and that the primary nature of the improvements are bridges which are the only surface transportation
link to the ma inland. However, preliminary reviews suggest it could be accomplished by constructing the western -most MacKay
bridges first or focusing on only the east bound segment of the corridor.
The current SCDOT estimate for this project includes a minimal contingency value, however, should actual costs exceed the
estimated costs, shortfalls may be addressed using County Road Impact Fees, County TAG fees, CTC funding, or other locally
appropriated funds.
5.11 IMPACT FEES
Beaufort County has implemented traffic impact fees dedicated to the preliminary planning and engineering of this project to assist
in its financing.
$0
$20,000,000
$40,000,000
$60,000,000
$80,000,000
$100,000,000
$120,000,000
$140,000,000
May-19
July-19
September-19
November-19
January-20
March-20
May-20
July-20
September-20
November-20
January-21
March-21
May-21
July-21
September-21
November-21
January-22
March-22
May-22
July-22
September-22
November-22
January-23
March-23
May-23
CHART 13: SCHEDULE OF PROJECTED REVENUES FOR LOCAL CONTRIBUTIONS
83
49
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
5.12 HOSPITALITY TAX
Beaufort County has not implemented a hospitality tax dedicated to this project to assist in its financing. This tax may be allocated
for this project by County Council action. Currently traffic impact fees have already been allocated for project funding.
5.13 LOCAL SALES TAX
Beaufort County voters passed a 1% local sales tax that will generate $80 million for traffic improvement s on Hilton Head Island
as part of this project. More information regarding the sales tax is in Section 5.3 SOURCE OF LOCAL CONTRIBUTION.
5.14 USER FEE
Beaufort County has not implemented user fees dedicated to this project to assist in its financing. User fees are not appropriate to
use along this corridor, as user fees (tolls) are typically used where motorists have an option to pay a toll or use another road. US
278 is the only route for motorists to access Hilton Head Island.
5.15 TAX INCREMENT FINANCING DISTRICTS
Beaufort County has not implemented a Tax Increment Fina ncing Districts (TIF) dedicated to this project to assist in its financing.
TIFs are typically used in areas that redevelopment of blighted properties or public property development is ta rgeted or desired.
This is not the case for areas in and around Hilton Head Island and Beaufort County that would be impacted by the US 278 Bridges.
The development goals for the area align with preservation of the corridor and accommodating the existing a nd projected traffic
needs than redevelopment or additional development making a TIF an inappropriate funding source for this project.
5.16 ASSESSMENT PROGRAM
Beaufort County has not implemented an assessment program dedicated to this project to assist i n its financing. An assessment
program is not appropriate for this project as the impact of improving the US 278 bridges to Hilton Head Island reaches far beyond
just the property owners within the area. The impact of these bridges is felt across the regio n and the state in terms of the large
amount of tourism occurring in Hilton Head Island and resulting economic impacts and revenues.
5.17 DEVELOPMENT AGREEMENT PROGRAM
Beaufort County has not implemented a development agreement program dedicated to this p roject to assist in its financing. A
development agreement program is not appropriate for this project as the improving the US 278 bridges to Hilton Head Island is
not to service any specific development. These bridges are part of the critical transportati on system serving both the region and
state interests.
5.18 ZONING & LAND USE CONTROLS TO FOSTER USE OF EXISTING ROADS TO CONNECT
DEVELOPMENTS
This section is not applicable to the US 278 bridges to Hilton Head Island, as this project is the only connection of ground -based
transportation connection between Hilton Head Isla nd and the mainland of South Carolina. This project reaches well beyond the
purpose of connecting developments. These bridges are part of the critical transportation system serving both the region and state
interests.
5.19 CASH FLOW ANALYSIS
The major determination for this project currently is to make the most effective and efficient use of funds for the region. With the
status of the Karl Bowers Bridge, SCDOT must invest funds to replace the structure. While the remaining three bridges were
constructed between 1982-1983 and are not in need of immediate replacement due to structural deficiencies, they do suffer from
deferred maintenance and will require improvements for congestion relief, and eventually, will require replacement for capacity
improvements as the region continues to grow. Based on this, the estimated system preservation costs versus the current project
cost, illustrate the current investment is a better use of funds economically, as well as for the public benefit obtained.
84
50
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Potential system preservation costs for these types of structures, using present day value and assuming a 70 -year lifespan for
these structures (replacement in 2053), is shown below:
TABLE 9: ESTIMATED MAINTENANCE AND REPAIR COSTS OF PROJECT OVER EXPECTED USEFUL LIFE
TIME FRAME MAINTENANCE ACTIVITY ESTIMATED COST
2020 – 2025: Miscellaneous Steel Repairs / Painting $10M - $15M
2030 – 2035: Miscellaneous Steel Repairs $1.0M - $2.0M
Major Systems Preservation Investment $85M - $95M
2035 – 2040: Miscellaneous Crack Repair / Crevice Corrosion $10M - $15M
2040 – 2045: Miscellaneous Steel Repairs $1.0M - $2.0M
2050 – 2055:
New Structures to be Built / Existing Structures demolished $190M - $200M
Karl Bowers Bridge Structure to be modified $20M - $25M
TOTAL $317M - $329M
5.20 INFLATION RATE
The South Carolina Department of Transportation used an inflation factor of 15% in the proposed cost estimate. This inflation factor
only covers the 36-month design development period.
5.21 CONDEMNATION PROCEEDINGS
The South Carolin a Department of Transportation is willing to serve as the named party in any condemnation proceedings i f
condemnation is needed to complete this project, as this is a SCDOT project improving SCDOT infrastructure.
5.22 OTHER FUNDING SOURCES SOUGHT
Other funding, besides those already listed hereinabove, have not been utilized or sought for this project at t his time. The South
Carolina gas tax increase is not able to be used for this project as most of that funding is going to address deteriorating infrastructure
that has already been prioritized by the state. These bridges were not part of that list as three of the four bridge spans of US 278
to Hilton Head Island were built in the 1980’s and are not in need of repair due to deteriorating infrastructure but instead need
expansion to address the lack of capacity.
5.23 POTENTIAL OBSTACLES
Currently Beaufort County has no legal issues related to this project. There are no pending lawsuits against the County associated
with this project at this time. An Environme ntal Assessment (EA) is currently underway on the project. SCDOT anticipates an
approved FONSI by 2021 and US Army Corps of Engineers and US Coast Guard permits by 2022 Right-of-way costs have not yet
been calculated.
Managing Obstacles
Beaufort County and SCDOT have a long and successful history of collaboration on major highway projects and are both committed
to ensuring the success of this project. Beaufort County has been proactively engaging and coordinating with the public,
stakeholders, and partners including:
• South Carolina Department of Transportation
• Town of Hilton Head
• Town of Bluffton
• USACOE
• SCDHEC
• Coastal Conservation League
• Native Island Community
5.24 LOCAL MATCH OR CONTRIBUTION
Per the evaluation criteria, this information is listed within Section 5.2 PROJECT WITH TOTAL COST: IN EXCESS OF $50
MILLION. The Financial Plan scope for this application is 49.46 points out of a maximum score of 50 points
85
Beaufort County - US 278 Corridor Improvement Project
APPENDIX A
LOCAL RESOLUTIONS
86
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Beaufort County Council Resolution
87
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
88
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Lowcountry Area Transportation Study Policy Committee Resolution
89
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
90
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Town of Hilton Head Island Town Council Resolution
91
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
92
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
93
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
94
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
95
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
APPENDIX B
LETTERS OF SUPPORT
96
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Henry McMaster, Governor of South Carolina – Letter of Support
97
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
The City of Beaufort – Letter of Support
98
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
The Town of Bluffton – Letter of Support
99
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Southern Carolina Regional Development Alliance – Letter of Support
100
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
APPENDIX C
EXISTING PLANS WHERE THIS
PROJECT IS PRIORITIZED OR
REFERENCED
101
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
This project has unanimous support from all local governing bodies and jurisdictional entities and has been listed and prioritized in
many long range and strategic plans. This roadway project has been listed as a priority project in the following documents:
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION:
• SCDOT Statewide Transportation Improvement Program (STIP) (2017 -2022)
The US 278 Corridor Improvements / US 278 Corridor Improvements from Buckingham Plantation Dr to Squire Pope Road,
including replacement of eastbound Mackay Creek Bridge, intersection improvements on Pinckney Island and improvements
to Jenkins Island is listed in the SCDOT STIP
• SCDOT Lowcountry Project/Ten Year Plan (2018)
o The 2018 SCDOT Ten -Year Plan for the Lowcountry region lists the US 278 eastbound bridge over Mackay
Creek replacement as a priority project.34
o Listed under Lowcountry Projects:
“Route: Fording Island Rd (US 278 EB)
County: Beaufort
Project Name: US 278 EBL over Mackay Creek
Construction Year: 2023
Category: Eliminate Interstate/NHS Structurally Deficient Bridges”
• 2016 SCDOT Interstate/NHS Bridge Replacement Priority List
o The US 278 eastbound lane of the Karl Bowers Bridge over Mackay Creek is #2 ranked structurally deficient
bridge in South Carolina.
• South Carolina 2040 Statewide Multimodal Transportation Plan (2014)
o “US 278 has been identified for priority improvements to pre serve and improve freight movements by truck
within South Carolina.”35
LOWCOUNTRY AREA TRANSPORTATION STUDY (LATS) METROPOLITAN PLANNING ORGANIZATION:
• Lowcountry LATS Transportation Improvement Program (TIP) (2019)
o “US 278 Corridor Improvements from Buckingham Plantation Dr to Squire Pope Rd, including replacement of
the EB Mackay Creek Bridge, intersection improvements on Pinkney Island and improvements to Jenkins
Island.”36
34 South Carolina Department of Transportation, Lowcountry Project/Ten Year Plan, (2018)
35 South Carolina Department of Transportation, South Carolina 2040 Statewide Multimodal Transportation Plan, (2014)
36 Lowcountry Area Transportation Study (LATS) Metropolitan Planning Organization, Lowcountry LATS Transportation Improvement Program, (2019)
102
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
BEAUFORT COUNTY:
• Beaufort County Strategic Plan (2018)
o “U.S. Highway 278 Expansion/Improvements is listed as a top priority under the Policy Agenda for the Beaufort
County Strategic Plan.”37
o “U.S. Highway 278 Corridor (Gateway): Environmental Assessment for Bridge is listed as a t op priority under
the Management Agenda for the Beaufort County Strategic Plan.”37
• Beaufort County Comprehensive Plan (2010)
o “Additional Planned Transportation Improvements to Address 2025 Needs: US 278 Bridge Widening from to
Hilton Head Island to 6 lanes divided. Estimated cost = $155 Million”38
• Southern Beaufort County Regional Plan (2006)
o “The most visible consequence of southern Beaufort County’s fast rate of growth is the demand it places on
the region’s roads. The rapid rate of growth has already caused portions of U.S. 278, the region’s primary east-
west arterial, to fail with traffic volumes far exceeding capacity between S.C. 46 and the bridges to Hilton Head
Island.”39
TOWN OF HILTON HEAD ISLAND:
• Town Council 2018 Key Priorities Dashboard (2018)
o “The Hilton Head Town Council authorized funding in the amount of $45,882 to assist Beaufort County with
the engineering services required to prepare this application to the State Infrastructure Bank (SIB). An
intergovernmental agreement has been executed as a result. “ 40
• Town of Hilton Head Island Comprehensive Plan (2017)
o Goal 6.3-D is “To have a pathway network that provides for recreational opportunities as well as an alternative
means of transportation to and on the Island” … Implementation Strategy 6.3-D is to “Coordinate with SCDOT
and Beaufort County to provide a pathway link to the mainland.”
o “The bridges onto the Island are critical public facilities that provide the only vehicular access for residents and
visitors to the Island, as well as the only ground transportation link for emergency evacuations. Protection of
these critical facilities should be a priority.”41
• Mayor's Task Force for the Island's Future - Vision for 2025 (2010)
o “THREATS - Third Priority Tier: - Limited capacity of bridge to mainland; … It is the intent of the Town Council
of Hilton Head Island to revitalize the Island’s buildings and infrastructure by: Improving access to the Island
(local, county, state, and federal) as well as internal connectivity and circulation.”42
37 Beaufort County, Beaufort County Strategic Plan, (2018)
38 Beaufort County, Beaufort County Comprehensive Plan, (2010)
39 Beaufort County, Southern Beaufort County Regional Plan, (2006)
40 Town of Hilton Head Island, Town Council 2018 Key Priorities Dashboard, (2018)
41 Town of Hilton Head Island, Town of Hilton Head Island Comprehensive Plan, (2017)
42 Town of Hilton Head Island, Mayor's Task Force for the Island's Future - Vision for 2025, (2010)
103
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
Improving the US 278 bridges to reduce congestion between Moss Creek Drive and Squire Pope Road and replacing the
structurally deficient eastbound span on the Karl Bowers Bridge corresponds with priorities, goals, and objectives listed
in all local and regional planning documents and has unanimous support from all entities with jurisdictional influence in
the area.
The project is also listed in the following additional local land use plans and related documents:
Beaufort County:
• Beaufort County Strategic Plan (2018)
• Jenkins Island Access Management System - Preliminary Project Planning Environmental Screening Report (2015)
• Beaufort County Comprehensive Plan (2010)
• Cursory Above Water & Underwater Investigation of US 278 Eastbound & W estbound Over MacKay Creek and Skull
Creek (2010)
South Carolina Department of Transportation:
• South Carolina Statewide Transportation Improvement Program (2017 -2022)
• South Carolina Strategic Corridors Plan (2014)
• South Carolina 2040 Statewide Multimodal Transportation Plan (2014)
Lowcountry Area Transportation Study (LATS) Metropolitan Planning Organization:
• 2040 Lowcountry Area Transportation Study (LATS) Metropolitan Planning Organization's Long-Range Transportation
Plan (2015)
Town of Bluffton
• Town of Bluffton Comprehensive Plan (2014)
Town of Hilton Head Island:
• Town of Hilton Head Island Comprehensive Plan (2017)
Lowcountry Area Transportation Study (LATS) Metropolitan Planning Organization:
• 2040 Lowcountry Regional Transit and Coordination Plan (2014)
Jasper County, South Carolina
• Jasper County Comprehensive Plan (2014)
104
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
APPENDIX D
LATS MPO Scoring Criteria
105
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
106
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
APPENDIX E
SCDOT Commitment of Funds
107
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
108
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
109
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
110
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
111
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
112
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
113
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
114
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
115
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
116
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
117
Beaufort County - US 278 Corridor Improvement Project
STATE INFRASTRUCTURE BANK APPLICATION
118
COUNTY COUNCIL OF BEAUFORT COUNTY
OFFICE OF THE COUNTY ADMINISTRATOR
ADMINISTRATION BUILDING
BEAUFORT COUNTY GOVERNMENT ROBERT SMALLS COMPLEX
100 RIBAUT ROAD
POST OFFICE DRAWER 1228
BEAUFORT, SOUTH CAROLINA 29901-1228
TELEPHONE: (843) 255-2023
FAX: (843) 255-9403
www.beaufortcountysc.gov
CHERYL H. HARRIS
EXECUTIVE ASSISTANT
MIKE MOORE
COUNTY ADMINISTRATOR
March 28, 2025
S
outh Carolina Transportation Infrastructure Bank
Chairman John White
955 Park Street, Room 120 B
Columbia, SC 29201
R
E: US 278 Corridor Project – Project Update and Request Following Sales Tax Referendum
D
ear Chairman White,
This letter is in response to your correspondence dated November 7, 2024, requesting an update
on Beaufort County’s plans for the US 278 Corridor Project following the failed transportation
sales tax referendum last November. We sincerely appreciate the SC TIB Board’s willingness to
extend the response deadline to March 31, 2025, allowing time for the County, the Town of Hilton
Head Island, and other project stakeholders to formulate a revised and realistic path forward. Since
the SCTIB meeting on November 20, 2024, we have worked diligently toward that goal.
With the option of a transportation sales tax no longer available to close the project’s funding gap,
our initial efforts focused on identifying other potential local funding sources. Unfortunately, the
scale of the shortfall far exceeded the County’s ability to bridge the gap using alternative funding.
As a result, the conversation shifted from how to fully fund the original project scope to what could
be accomplished within the existing $300 million in committed funding.
At the recommendation of our legislative delegation, the County, the Town and SCDOT explored
a phased approach that would address the most critical needs —specifically, the aging eastbound
bridge spans. SCDOT developed six alternative concepts with varying cost estimates. Of these,
only one alternative fit within the available fu nding. This alternative includes the construction of
a new three-lane eastbound bridge, along with minimal roadwork to tie into the existing roadway
network. Due to funding constraints, the bridge would be initially striped for two lanes, with the
third lane to be opened in a future phase when additional funding is available. The westbound lanes
and bridge structures would remain in use for the time being. Access to Pinckney Island would be
maintained via the existing spans across Skull Creek.
Although this redefined scope is more limited than originally envisioned, it addresses the most
immediate safety concerns while laying the groundwork for future corridor improvements. With
119
strong coordination between Beaufort County and the Town of Hilton Head Island, both
jurisdictions have reached consensus on this refined project plan. To formalize this support, the
County and Town jointly adopted Resolution 2025/15, which outlines the key components of the
revised project. A copy of the resolution is included with this letter for your reference.
Rather than requesting additional funds from SCTIB to close the $190 million funding gap,
Beaufort County respectfully requests that SCTIB maintain its current $120 million funding
commitment to support this revised project scope. We believe this remains a meaningful and
impactful infrastructure improvement that will deliver long -term regional and statewide benefits.
With broad stakeholder alignment, we are prepared to advance the project immediately upon
receiving SCTIB’s confirmation of continued support. With funding in place, the County and
SCDOT are ready to finalize the NEPA process, complete engineering and permitting, and move
the project to construction bidding by the end of 2027.
In addition to maintaining the current SCTIB funding commitment, the County requests SCTIB’s
approval of the proposed expenditure order of funds. The total revised project cost is estimated at
$272.7 million. With $298.53 million currently available—including SCTIB’s $120 million—this
leaves approximately $25.83 million beyond the base project cost.
As the project owner, Beaufort County bears responsibility for any project cost overruns. The
County proposes to allocate the remaining $25.83 million as follows:
• Funding a required water main relocation for the local public service district;
• Delivering a small safety improvement project in the Stoney Community, consistent with
the original corridor vision;
• Establishing a contingency reserve of approximately $15 million to cover unforeseen
expenses.
Should these contingency funds remain unspent at project completion, they will be directed toward
additional road improvements within the US 278 corridor. This approach offers both fiscal
responsibility and flexibility to address project-related priorities while managing taxpayer dollars
prudently.
The SCTIB funds would remain dedicated to construction activities, as originally pledged. The
proposed order of expenditure is: County and SCDOT funds would cover engineering, right -of-
way acquisition, and utility coordination. The construction costs would be paid in the following
order—SCDOT funds, SCTIB funds, then County funds. If construction costs exceed projections,
the County’s reserved contingency would be used to cover the overages. If not, the reserves would
support enhancements within the corridor.
As you can see, significant time and effort have gone into developing this revised plan to
responsibly advance this critical infrastructure project. We are grateful for SCTIB’s continued
investment and partnership and respectfully request favorable consideration of our two requests:
120
1. Retain SCTIB’s $120 million project commitment;
2. Approve the proposed order of expenditure as outlined above.
Thank you for your continued support of Beaufort County and the US 278 Corridor Project. We
look forward to working together to deliver meaningful improvements for the region and the State
of South Carolina.
Kindest regards,
Mike Moore
County Administrator
CC: Charles Cannon – SCTIB Executive Director
Justin Powell – SCDOT Secretary of Transportation
Marc Orlando – HHI Town Manager
Beaufort County Delegation
County Council
Attachments:
1. County and Town Joint Resolution 2025/15
2. State Delegation Support Letter
3. Rep. Mace Support Letter
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
US 278 Corridor Project Update
May 19, 2025
137
2
Option 1
Option 6
Plans from SCDOT at 2/12/25 Joint Council Meeting
138
2
Option 1 Plan presented 2/12/25
139
2
Option 1Option 6
Option 6 Plan presented 2/12/25
140
Available Funding
County (Sales Tax & Impact Fees) $101.00M
SCDOT $ 90.60M
HHI (R/W Dedication) $ 3.35M
State Infrastructure Bank $120.00M
Total = $314.95M
Available Cash for Remaining Project = $298.53M
(Less $13.07M already expended and $3.35M HHI R/W donations)
4
Presented by SCDOT at 2/12/25 Joint Council Meeting
141
Where Are We Now?
7
142
May 12, 2025
Rejection of County’s Revised Proposal The SIB Board voted to reject the County’ s revised
proposal based on the following concerns:
• Funding Sequence Conflict: The revised funding plan contradicted the Intergovernmental Agreement (IGA),
which required SIB funds to be used last, not first.
• Town Contribution Misalignment:Hilton Head Island’s contribution was in the form of land (right-of-
way), not cash
• Reduced Bridge Scope: The scaled-back design reduced the number of lanes from the original agreement.
The SIB did not believe it should still contribute the full $120 million.
• Unclear Cost Overrun Strategy: The County did not provide a clear plan to cover potential cost overruns.
The SIB suggested pledging County bonding capacity (up to $87 million)—not recommended by staff.
• Missing Timeline: A detailed construction and completion schedule was not included.
• Expected Local Commitment: The SIB expected increased financial
participation from both SCDOT and the County to lessen reliance on SIB funds.
• IGA Violation:The agreement was violated as construction did not commence in 2024. 8
SIB Board Decision
143
May 15, 2025: County representatives held a conference call with members of
the legislative delegation and the Chair of the State Infrastructure Bank (SIB) to
discuss the proposal's rejection and potential next steps.
May 15, 2025: County representatives held a conference call with SCDOT Secretary
of Transportation to discuss the possible alternatives in response to the SIB discussion.
May 19, 2025 A special called meeting of County Council was convened to
evaluate and consider possible options for moving forward.
9
Post Rejection Follow-up Actions
144
Staff Identified Options
10
145
Staff Identified Options
11
Option #1 – 5/19/25
Terminate the Intergovernmental Agreement (IGA) with the State Infrastructure Bank (SIB)
Collaborate with SCDOT to proceed with the replacement of the Mackay Creek Bridge
Construct a 3-lane bridge, as recommended by SCDOT and staff, to accommodate future
corridor capacity needs
Fund the third lane’s incremental cost using a portion of the $80M from the 2018 Sales Tax
Referendum
Utilize remaining sales tax funds and consider utilizing $21M in impact fees for additional
improvements along the US 278 Corridor, from Moss Creek Rd to Squire Pope Rd.
146
Option 1 – Available Funding
County (Sales Tax & Impact Fees) $101.00M
SCDOT $ 90.60M
HHI (R/W Dedication) $ 3.35M
State Infrastructure Bank $120.00M
Total = $191.60M
Total Project Cost = $101,670,000M ($13,070,000M already expended)
6
147
Staff identified Options
12
Option #2 – 5/19/25
Pursue an amended Intergovernmental Agreement (IGA) with the State Infrastructure
Bank (SIB), restructuring the funding sequence to prioritize:
1. County funds
2. SCDOT contributions
3. Remaining SIB funding
Beaufort County would assume responsibility for any project cost overruns under the
amended agreement. The SIB’s full $120M commitment to the project is critical
Maintaining the SIB’s full $120 million commitment is essential to the project’s viability.
Without the SIB’s full support, the project cannot proceed unless an alternative, clearly
identified funding source is secured.