Town of Hilton Head Island
Town Council Meeting
Thursday, January 9, 2025, 1:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Adoption of the Agenda
3. Workshop Discussion
a. William Hilton Parkway Gateway Corridor Project Status
4. Public Comment - Non Agenda items
5. Adjournment
FOIA Compliance: Public notification of this workshop has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 1 of 58
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Town Council
TO: Town Council
FROM: Shawn Colin, AICP, Assistant Town Manager
CC: Marc Orlando, ICMA-CM, Town Manager
DATE: January 9, 2025
SUBJECT: William Hilton Parkway Gateway Corridor Project Update
BACKGROUND:
This memorandum serves as an update on the William Hilton Parkway Gateway
Corridor Project, providing relevant information for your review prior to the upcoming
public workshop scheduled for October 9, 2025. Below is a summary of events and
developments related to the project. In this regard, please see the following:
1. M
emorandum of Understanding (MOU) Approval:
On June 28, 2024, the Town Council approved an MOU with Beaufort County,
granting municipal consent for the project. This MOU was sent to Beaufort County
with a request for their approval. The approved MOU is included as Attachment 1.
2. B
eaufort County Response:
Beaufort County Administrator Michael Moore responded on November 27, 2024,
with a proposal to bifurcate the MOU into two separate agreements: one focusing on
the Bridge and Corridor project, and the other addressing community-related
elements, particularly in the Stoney Historic Community. Curtis Coltrane's review of
the proposed MOUs is also included. These items are included as Attachments 2-5.
3. S
CSIB Funding Request:
Following the failure of the November 2024 Transportation Sales Tax referendum,
the South Carolina State Infrastructure Bank (SCSIB) requested Beaufort County
submit an updated funding plan by November 7, 2024, allowing 15 days for a
response. The letter from SCSIB is included as Attachment 6.
4. S
CDOT Coordination and Deadline:
The South Carolina Department of Transportation (SCDOT) issued a letter to
Beaufort County on November 18, 2024, regarding the need for coordination on
addressing the deficient bridge. The letter set a March 31, 2025, deadline for a
decision. This letter is included as Attachment 7.
Page 2 of 58
Page 2 of 4
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
5. SCSIB Meeting:
On November 20, 2024, the SCSIB considered a request from Beaufort County for
an additional $90 million to support the project. The SCSIB did not appr ove
additional funding but granted an extension until March 31, 2025, for Beaufort
County to develop an alternative funding strategy.
6. December 6, 2024, Meeting:
On December 6, 2024, a meeting was held at Beaufort County’s request to discuss
the SCSIB and SCDOT letters. The meeting included key representatives from
Beaufort County, the Town of Hilton Head Island, and the South Carolina legislature.
The outcome of the meeting was a commitment from both Beaufort County and
Hilton Head Island to evaluate cost estimates, identify potential funding sources, and
determine actionable next steps.
Meeting Attendees:
o SC Senator Tom Davis
o Town of Hilton Head Island:
Alan Perry, Mayor
Alex Brown, Councilman
Marc Orlando, Town Manager
Shawn Colin, Assistant Town Manager
o Beaufort County:
Joe Passiment, County Council Chairman
Larry McElynn, Councilman
Alice Howard, Councilwoman
Michael Moore, Administrator
Jared Fralix, Assistant Administrator
7. December 19, 2024, SCDOT Meeting:
A meeting was held at the SCDOT Administration building in Columbia, South
Carolina, on December 19, 2024, regarding the Gateway Corridor project.
Representatives from SCDOT, Beaufort County, and the Town of Hilton Head Island
discussed the project's funding status, potential additional funding sour ces, and
options for addressing deficiencies based on available funds.
Meeting Attendees:
o SC Senator Tom Davis
o SCDOT:
Justin Powell, Secretary of Transportation
Rob Perry, PE, Deputy Secretary for Engineering
Page 3 of 58
Page 3 of 4
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
John Boylston, Chief Engineer for Program Delivery
Casey Lucas, PE, Regional Production Group Engineering
Maggie Hendry, Chief Administrative Officer
Craig Winn, PE, Lowcountry Program Manager
o Beaufort County:
Mike Moore, County Administrator
Jared Fralix, Assistant County Administrator
o Town of Hilton Head Island:
Shawn Colin, Assistant Town Manager
T
he group discussed the project's funding status, potential additional funding
sources, and options to address deficiencies based on available funds. Key topics
discussed were as follows:
o Funding Shortfall:
The group considered potential funding sources, including upcoming grants and
a future Beaufort County referendum, to address an approximate $190 million
funding shortfall.
o Project Options Based on Available Funds:
Three options were presented:
Option A: Execute the current proposed project by securing additional
funding to bridge the $190 million gap.
Option B: Proceed with a $300 million funding, adjusting the project scope to
match available funds.
Option C: Define a project within a reduced budget of approximately $180
million if the SIB withdraws its contribution.
o Project Elements Breakdown:
SCDOT will continue to itemize the project elements contributing to the total cost
of $490 million. These elements include bridge replacement, a multipurpose
pathway, roadway adjustments on Jenkins Island, and improvements to the
Stoney Community.
o Potential Project Adjustments:
Reductions in the project scope may require revisions to the Environmental
Assessment (NEPA review) and modifications to the agreement with the SIB,
potentially delaying the project by 9-12 months.
o Next Steps:
SCDOT will provide updated cost estimates in the coming weeks.
A follow-up meeting will likely occur in mid-January to review cost estimates
and further discuss options.
A meeting with the SIB is anticipated in February to explore next steps and
resolve funding issues.
Page 4 of 58
Page 4 of 4
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
ATTACHMENTS:
1. Memorandum of Understanding Approved by Town Counc il on June 28, 2024
2. Response Letter from Beaufort County Administrator dated November 27, 2024
3. Beaufort County Proposed MOU for "Bridge and Corridor"
4. Beaufort County Proposed MOU for "Stoney Historic Community"
5. Curtis Coltrane Review of Beaufort County Proposed MOUs for "Bridge and
Corridor" and for "Stoney Historic Community"
6. Letter from South Carolina State Infrastructure Bank to Beaufort County, dated
November 7, 2024
7. Letter from South Carolina Department of Transportation to Beaufort County,
dated November 18, 2024
Page 5 of 58
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF HILTON HEAD
ISLAND, SOUTH CAROLINA, AUTHORIZING THE TOWN MANAGER TO
ENTER INTO A MEMORANDUM OF AGREEMENT WITH BEAUFORT
COUNTY, SOUTH CAROLINA FOR THE WILLIAM HILTON PARKWAY
GATEWAY CORRIDOR PROJECT.
WHEREAS, Beaufort County, South Carolina is the sponsor of a Project proposed
to include the replacement of all four bridges crossing Mackay Creek and Skull Creek and
the U.S. Highway 278 corridor on Jenkins Island, the causeway from Jenkins Island to
Hilton Head Island, and on Hilton Head Island to the intersection of U. S. Highway 278
and Spanish Wells and Wild Horse Roads (the "Project"); and,
WHEREAS, while the Town and Beaufort County have worked diligently to
reduce and/or eliminate impacts arising from the Project, the Project will have impacts
on the citizens, residents, property owners and visitors of and to the Town; and
WHEREAS, in order to alleviate or reduce the impacts, the Town and Beaufort
County desire to undertake actions related to the Project that are outlined in the proposed
Memorandum of Agreement that is attached hereto as Exhibit "A"; and
WHEREAS, the Town Council hereby finds that the execution of the proposed
Memorandum of Agreement with Beaufort County is in the best interests of the Town of
Hilton Head Island and its citizens, residents, property owners and visitors.
NOW, THEREFORE, BE IT, AND IT HEREBY IS, RESOLVED BY THE
TOWN COUNCIL FOR THE TOWN OF HILTON HEAD ISLAND, SOUTH
CAROLINA:
1. The Town Manager to execute and deliver the Memorandum of Agreement with
Beaufort County that is in the form and substance of Exhibit "A" to this
Resolution.
2. The Town Manager is authorized to take all actions necessary to comply with
the Town's obligations set out in the Memorandum of Agreement.
Page 1 of2
ATTACHMENT 1
Page 6 of 58
Page 7 of 58
Page 8 of 58
Page 9 of 58
Page 10 of 58
Page 11 of 58
Page 12 of 58
Page 13 of 58
Page 14 of 58
Page 15 of 58
Page 16 of 58
Page 17 of 58
Page 18 of 58
Page 19 of 58
Page 20 of 58
Page 21 of 58
Page 22 of 58
Page 23 of 58
Page 24 of 58
Page 25 of 58
Page 26 of 58
Page 27 of 58
Page 28 of 58
Page 29 of 58
Page 30 of 58
ATTACHMENT 2
Page 31 of 58
1
STATE OF SOUTH CAROLINA ) MEMORANDUM OF AGREEMENT FOR
) WILLIAM HILTON PARKWAY GATEWAY
COUNTY OF BEAUFORT ) CORRIDOR PROJECT
THIS MEMORANDUM OF AGREEMENT FOR WILLIAM HILTON PARKWAY
GATEWAY CORRIDOR PROJECT (“Agreement”) is made and entered into this _ ____ day
of __________December, 2024 (“Effective Date”), by and between the Town of Hilton Head
Island, South Carolina (“Town”), and Beaufort County, South Carolina (“County”) ; collectively
hereinafter the “Parties”.
WHEREAS, the U.S. Highway 278 (“Hwy 278”) corridor, extending from I -95 to Sea
Pines Circle, is of regional importance to the Town, the County, and the State of South Carolina in
facilitating trade, commerce, transportation of the local workforce, and the transportation of Town
residents, visitors, and workers throughout the entire region; and
WHEREAS, access to Hilton Head Island by vehicles is currently via U.S. Highway
278Hwy 278 , which includes four bridges, being east and west bound bridges connecting the
mainland with Pinckney Island over Mackay Creek, and east and westbound bridges connecting
Pinckney Island to Jenkins Island over Skull Creek; and
WHEREAS, from Jenkins Island, U.S. HighwayHwy 278 crosses a causeway to Hilton
Head Island whereby U.S. HighwayHwy 278 is also known as William Hilton Parkway; and
WHEREAS, the South Carolina Department of Transportation (“SCDOT”) has inspected
the Karl S. Bowers eastbound bridge that spans Mackay Creek and has found this structure to be
structurally deficient and subject to continuing deterioration; and
WHEREAS, traffic entering and leaving Hilton Head Island on a daily basis has increased
over time, and the existing corridor does not efficiently handle the traffic in the corridor extending
from the intersection of U.S. HighwayHwy 278 and Spanish Wells Road to the intersection of U.S.
HighwayHwy 278 and Moss Creek Drive; and
WHEREAS, to address concerns posed by the deteriorating condition of the eastbound
Mackay Creek bridge, and the need to reduce congestion and provide safety improvements for the
entrance to Hilton Head Island , the County conducted a Transportation Sales Tax Referendum
(“Referendum”) that included a proposed project for the repair and/or replacement of all four
bridges and additional improvements to the U.S. HighwayHwy 278 corridor from the intersection
of U.S. HighwayHwy 278 and Squire Pope Road to the intersection of U.S. HighwayHwy 278 and
Moss Creek Drive, among other things; and
WHEREAS, following the adoption of the Transportation Sales Tax RReferendum, by the
voters in Beaufort County the William Hilton Parkway Gateway Corridor Project, collectively
ATTACHMENT 3
Page 32 of 58
2
referred to herein as the “Project,”, was created as a County project for those improvements within
the SCDOT owned right- of- way; and
WHEREAS, the Project will begin at the intersection of U.S. HighwayHwy 278 and Moss
Creek Drive and run to the intersection of U.S. HighwayHwy 278 and Spanish Wells and Wild
Horse Roads as shown ion Exhibit 1 which is attached to this Agreement, and which is attached
hereto and incorporated herein by reference; and
WHEREAS, the portion of the Project beginning at the point where the Skull Creek
bridges meet Jenkins Island and ending at the intersection of Hwy 278 and Spanish Wells and Wild
Horse Roads is located within the Town’s municipal limits. The portion of the Project within the
municipal limits of the Town, will impact the property owners and citizens of and visitors of the
Town; and
WHEREAS, in 2019, the Town Council for the Town of Hilton Head Island, South
Carolina ( the “Town Council” ), created the U.S. 278 Gateway Corridor Committee which
developed a series of “Guiding Principles” to be utilized in developing the Project which were
formally adopted by Town Council on February 18, 2020; and
WHEREAS, the Project is now proposed to include theconsists of the replacement of all
four bridges crossing Mackay Creek and Skull Creek to meet current design and safety code
specifications, improved transportation performance throughout the corridor and within all major
intersections, improved access to the Pinckney Island National Wildlife Refuge an d the C.C.
Haigh, Jr., boat ramp,; improvements to address pedestrian and bicyclist needs, and improvements
to address existing conditions within the corridor that are negatively affecting property owners and
residents of the Big and Little Stoney Historic Neighborhoods (herein, collectively, the “Stoney
Historic Community”), all of which are generally reflected in the Selected Alternative plans revised
project design plans shown in Exhibit 2 attached hereto and incorporated herein by reference; and
to this Agreement which are attached hereto and are incorporated herein by reference; and
WHEREAS, in 2019, the Hilton Head Island Town Council, hereinafter the “Town
Council”, created the U.S. 278 Gateway Corridor Committee which developed a series of “Guiding
Principles” to be utilized in developing the Project which were formally adopted by Town Council
on February 18, 2020; and
WHEREAS, the part of the Project beginning at the point where the Skull Creek bridges
meet Jenkins Island and ending at the intersection of U.S. Highway 278 and Spanish Wells and
Wild Horse Roads is located within the Town’s municipal limits; and
Page 33 of 58
3
WHEREAS, the Project as a whole including the part within the municipal limits of the
Town, will impact the property owners and citizens of and visitors of the Town; and
WHEREAS, the U.S. Highway 278 corridor, extending from I -95 to Sea Pines Circle, is
of regional importance to the Town, the County, and the State of South Carolina in facilitating
trade, commerce, transportation of the local workforce, and the transportation of Town residents,
visitors, and workers throughout the entire region; and
WHEREAS, the Project is currently in the preliminary design stage and is working through
the NEPA process. A sas part of the NEPA process, a Preferred Alternative for the Project was
identified by the SCDOT and presented at a public hearing held on July 22, 2021; and
WHEREAS, following the development of the Preferred Alternative, on October 12, 2021,
the Town Council approved suggested revisions to be formally incorporated into the Modified
Preferred Alternative; and
WHEREAS, based upon public feedback and suggested revisions from the Town, SCDOT
presented a Modified Preferred Alternative at a public hearing held on March 3, 2022; and
WHEREAS, the County, as project sponsor, approved many of these recommendations
and they were formally incorporated into a n aAgreement that was approved on October 4, 2022;
and
WHEREAS, in response to a substantial number of additional comments made by the
residents of the Town and the County concerning the Project , and to determine the merits of the
Modified Preferred Alternative; , the Parties agreed determined that, as a necessary condition
precedent to making an informed decision on what options for the Project are in the best interests
of their citizens, property owners and residents, an independent review (the “Independent
Review”) should be performed by a qualified consultant (“Independent Review”); and
WHEREAS, the Parties coordinated on the procurement, awarding, and execution of an
Independent Review with consultant CBB Transportation Engineers and Planners, which
presented its findings on October 17, 2023; and
WHEREAS, the Town subsequently procured an additional transportation engineering
firm, the Lochmueller Group, to conduct a Town managed Independent Study. The Lochmueller
Group presented its findings and recommendations to the Town on June 17, 2024; and
WHEREAS, the Selected Alternative, as described in the environmental assessment 2024
revaluation, considers the changes to the Preferred Alternative from July 2021 through 2024; and
Page 34 of 58
4
WHEREAS, the Parties find that the completion of things set out in this Agreement are in
the best interest of the Town and County, and their citizens, residents, property owners and visitors;
and,
WHEREAS, in order to successfully incorporate these actions and the recommendations
from the Independent Study, the Parties are combining into this Agreement those elements that
have previously been agreed to by the Town and the County in addition to all other requirements
that the Town and County have now determined are integral to the Town’s municipal consent for
the Project; and
WHEREAS, as a n additional condition precedent ffor the Town to grant its municipal
consent for the Project, the Parties hereby agree and enter into this Agreement with the express
knowledge and understanding that the incorporation and completion of these terms will be a
condition of Town’s municipal consent for the Project.
NOW, THEREFORE, the Parties do hereby agree as follows regarding the overall
Project’s design and construction:
PROJECT DESIGN.
1. The Project will advance as shown in the Selected Alternative (Exhibit 2) with the County
as the sponsor and SCDOT managing and overseeing the Project, but in partnership with the Town
through a joint and equal partnership, for the entirety of the Project. DAll decisions and approvals
concerning significant changes or aesthetics of the Project shall be made in writing and signed by
both the Town Council and County Councilagreed upon by the Town Manager and County
Administrator when appropriate. respectively.
2. The P roject’s design will be modified to reflect those elements that are shown in the
elements shown in the Selected Alternative (Exhibit 2), which will serve to achieve the Project’s
goals while further reducing and/or eliminating the impacts to private property owners.
3. To the greatest extent feasible, the improvements proposed as part of the Project will be
accomplished within the existing right -of-way with the exception of a multi -use pathway to be
included on the northern side of the Project from the intersection of Spanish Wells Road to the
new bridge and which will connect to the bridge via a connection which will run underneath the
bridge coming onto Jenkins Island, and on the southern side of the Project from the intersection of
the Windmill Harbour Traffic Signal to the end of the Mackay Creek bridge span. as shown in the
Selected Alternative (Exhibit 2).
4. The Project design will provide a separation of pathways from roadways to the greatest
extent feasible and a pedestrian and bicycle safety plan shown in Exhibit 2, which consists of the
following:
a. Safe pedestrian refuges in median areas; and
Page 35 of 58
5
b. Removal of pavement and landscaping necessary to protect pedestrians and
bicyclists; and
c. The installation of up to two (2) pedestrian overpasses and intersection protections
that will facilitate the safe movement of pedestrians and bicyclists across the
proposed roadway area.
d.c. The integration of strategies to create a pedestrian -friendly Stoney Historic
Community corridor that honors and enhances the cultural fabric of the Stoney
Historic Community. The Project must balance infrastructure improvement with
respect for the Stoney Historic Community’s cultural values, traditions, and social
dynamics. Strategies to accommodate this include but are not limited to the
following:
i. Respect for Cultural Landmarks: Ensure that pedestrian pathways respect
and preserve cultural landmarks, and historical areas.
ii. Lighting and Security: Install adequate lighting and ensure pathways are
safe, well-maintained, and patrolled if necessary.
iii. Universal Design: Ensure pathways are accessible to people of all ages and
abilities, including those with disabilities.
iv. Link Key Destinations: Design pedestrian pathways to connect important
community destinations including schools, markets, parks, places of
worship, and community centers.
v. Multi-Modal Integration: Integrate pedestrian pathways with other modes
of transportation, such as public transit stops and enhance overall
connectivity.
vi. Green Spaces: Incorporate green spaces, trees, and vegetation along
pedestrian routes to provide shade, improve air quality, and enhance the
aesthetic appeal.
vii. Health Initiatives: Promote walking and cycling as healthy lifestyle choices
through community programs and infrastructure that encourage physical
activity.
viii. Cultural Education: Raise awareness within the community about the
benefits of improved pedestrian connectivity.
ix. Wayfinding and Signage: Use relevant symbols and signage to help
residents navigate the neighborhood easily.
x. Road Safety Audit and Bike and Pedestrian Plan.
5. To the greatest extent possible and as further described in thehe elements shown on Exhibit
2Selected Alternative (Exhibit 2), the will be incorporated in the Project’s design elements should
include the following easlements follows:
a. The County intends to maintain the smallest footprint possible . The County
supports a Project design with Oone (1) bridge with a n approximate width not
greater than 123 feet, 7 inches 125 feet extending from the mainland to Jenkins
Island consisting of three (3) twelve-foot (12’) wide travel lanes in each direction,
one (1) ten-foot (10’) wide outside shoulder in each direction, one (1) six-foot (6’)
wide inside shoulder in each direction, a twelve-foot (12’) wide multi-use pathway
along the southern side of the bridge, and physical barriers protecting the edges of
Page 36 of 58
6
the bridge and separating vehicular and pedestrian traffic which will include one
(1) bulb-out refuge of fifty-feet (50’) in length and twenty-feet (20’) in width over
the Mackay Creek, and one (1) bulb -out refuge of fifty -feet (50’) in length and
twenty-feet (20’) in width over the Skull Creek ; provided however, that these
design elements will continue to be evaluated with the specific goal of reducing, to
the maximum extent that is possible, the width of these various elements thereby
reducing the overall width of the bridge which will serve to reduce the visual
impacts of the bridge and in reducing the funding gap that is current ly present for
the Project; and
b. Three (3) travel lanes in each direction through the Jenkins Island section of the
Project which are each twelve-feet (12’) in width; and
c. Three travel lanes in each direction through the Stoney Historic Community
consisting of two (2) travel lanes which are eleven-feet (11’) in width and one (1)
travel lane which is twelve-feet (12’) in width; and
d. All Jenkins Island traffic will be routed to the Windmill Harbour Intersection and
the Jenkins Road intersection with William Hilton Parkway will be removed; and
e. Access to Hog Island, Mariners Cove, Blue Heron Point, Jenkins Island Cemetery,
Hilton Head RV Resort, and Hilton Head Harbor Marina will be from a new
frontage road to be located on Jenkins Island; and
f. There will not be a U.S. Highway 278 pedestrian crossing at the Windmill Harbour
intersection; and
g. Vehicle access to Hog Island, Blue Heron Point, and Mariners Cove will be moved
from southern side to northern side of U.S. Highway 278 with a new under bridge
connection; and
h. Landscaped medians of varying widths will be installed to balance safety, property
impacts, and aesthetics; and
i. The curb cut at Memory Matters, 117 William Hilton Parkway, will be removed ;
and
j. The median cut left turn movement for access to the Crazy Crab restaurant property,
104 William Hilton Parkway, will be relocated further westward towards the
adjacent Town-owned property; and
k. One (1) elongated left turn lane from eastbound William Hilton Parkway onto
Squire Pope Road; and
l. One (1) right turn lane from southbound Squire Pope Road onto westbound William
Hilton Parkway; and
m. A new right turn lane will be provided from eastbound William Hilton Parkway
onto Chamberlin Drive; and
n. The i ntersection of William Hilton Parkway and Spanish Wells Road and Wild
Horse Road will be modified to include the following elements:
i. Two (2) left turn lanes from northbound Spanish Wells Road to westbound
William Hilton Parkway; and
ii. One (1) through lane from northbound Spanish Wells Road to Wildhorse
Road; and
iii. One (1) right hand turn lane from northbound Spanish Wells Road to
eastbound William Hilton Parkway; and
Page 37 of 58
7
iv. One (1) left hand turn lane from southbound Wild Horse Road to eastbound
William Hilton Parkway; and
v. One (1) through lane from southbound Wild Horse Road to Spanish Wells
Road; and
vi. One (1) right turn lane from southbound Wild Horse Road to eastbound
William Hilton Parkway; and
vii. Improvements to the right turn lane from eastbound William Hilton
Parkway to northbound Spanish Wells Road; and
o. No at grade intersection on Pinckney Island; and
p. The b ridge height clearance will remain at 65 feet remain a t the lowest extent
possible over Skull Creek, same as the current bridge; and
q. Currently there is no bridge over Pinckney Island, the new The b bridge height
clearance over Pinckney Island will be awill be the lowest extent possible minimum
of 17.19 feet, currently there is no bridge over Pinckney Island; and
r. The bridge length is approximately 1.376 miles of the 4.218 mile project; and
s. The bridge will be designed to Safety Evaluation Earthquake (SEE) standards; and
t.s. The bridge will be designed to withstand a Category 5 hurricane.Federal and State
standards for natural disasters.
6. In addition to the design modifications in SectionItem 5 above, the following items will
also be pursued as part of continued Project design efforts:
6. Left turns during rush hour (peak hour) traffic will be minimized; and
b. An additional merge lane from the Cross Island Parkway westbound to William
Hilton Parkway will be evaluated; and
c.a. The Project’s design speed limits will be reduced to 45 miles per hour and will have
a posted speed limit of 450 miles per hour; and
d.b.The County will discuss and coordinate with the Town regarding the Aaesthetic
elements proposed for the bridge and gateway corridor entrance elements and
incorporated to the fullest extent possible the will meet Hilton Head Island Design
Review guidelines and will be approved by both Town Council and County
Council.
7. The Windmill Harbour Traffic Signal will be incorporated within thirty (30) days upon
execution of this Agreement into the Town’s adaptive traffic management system and funded by
the County. Additionally, the County will design and fund the installation of any corresponding
infrastructure and associated improvements including traffic signal mast arms as part of the
Project.
8.7. The Project will be designedd to Federal and State standards. The County will coordinate
with SCDOT to ensure the Town’s sufficiently to address concerns resulting fromregarding storm
surge impacts to the causeway connecting Jenkins Island to Hilton Head Island are addressed in
accordance to Federal and State standards will include other similar resilience related matters into
the Project design elements to ensure safe and reliable access for citizens, property owners,
residents, visitors, and emergency services. Methods to address these concerns may include any
of the following, but are not necessarily limited to these methods:
Page 38 of 58
8
a. Elevating the roadbed; and
b. Installing surge barriers; and
c. Installing armoring or other materials to withstand storm surge impacts; and
d. Installing vegetation along the causeway to reduce wave energy and minimize erosion;
and
e. Installing sufficient drainage systems to prevent water accumulation on the causeway;
and
f. Installing real-time monitoring systems to provide early warning of rising waters and
potential breaches as quickly as possible; and
g. Performing regular interval inspections and evaluations of the causeway to ensure its
long-term structural integrity in conjunction with the Town and appropriate emergency
management agencies.
9.8. Where feasible, the Project will include and utilize landscaped medians within the part of
the corridor beginning where the bridge meets Jenkins Island and extending through the Stoney
Historic Community to the intersection of U.S. HighwayHwy 278 and Spa nish Wells and Wild
Horse Roads, in-lieu-of using concrete medians and will include landscaping along the right of
way and on Town-owned property to reinforce the gateway entrance to Hilton Head Island through
the Stoney Historic Community and Jenkins Island as reflected in Exhibit 2..
10.9. Where appropriate to protect the interests of adjacent landowners or for protection of
natural resources, raised curbs and gutters will be installed on the exterior edge of the roadway to
reduce right-of-way requirements and to handle stormwater runoff and discharge.
11. Further design modifications determined to be appropriate and feasible will be pursued if
such will serve to further improve the quality of life within the Stoney Historic Community.
12.10. The PAll parties will make available all project data, including but not limited to , Project
cost estimates with supporting details, traffic traffic data, including modeling and simulation
materials, other technical documents, and related design files. Release of requested documents
related to the Project may be withheld by any party due to procurement procedures, copyright law,
or confidentiality agreements. Parties agree requested documents are not be used for purposes of
conducting additional studies or analysis of the Project.
13.11. Value engineering of the Project will be performed to identify and eliminate unwarranted
infrastructure and subsequent costs with the goal to improve functional quality as well as
optimizing initial and long-term investment thereby seeking the best possible value for the lowest
cost.
14.12. The Town will work cooperatively with the County and /or SCDOT regarding the
conveyance of any Town-owned land that may be necessary to accomplish the Project through the
adoption of an Ordinance by the Town Council identifying all such properties or portions thereof
to be transferred.
Page 39 of 58
9
(Signature Page to Follow)
IN WITNESS WHEREOF, the Town of Hilton Head Island, South Carolina, and Beaufort
County, South Carolina,Parties by and through their duly authorized officers, have executed this
Memorandum of UnderstandingAgreement on this ___day of June, 2024the Effective Date.
WITNESSES: TOWN OF HILTON HEAD ISLAND
_____________________________ By: __________________________
Marc Orlando, Town Manager
_____________________________
WITNESSES: BEAUFORT COUNTY
_________________________ By: ___________________________
Michael R. Moore , County Administrator
______________________________
WITNESSES: TOWN OF HILTON HEAD
ISLAND
_____________________________ By: __________________________
Page 40 of 58
10
Name: Marc Orlando
_________________________ Title: Town Manager
WITNESSES: BEAUFORT COUNTY
_________________________ By: ___________________________
Name: _______________________
_________________________ Title: County Administrator
Page 41 of 58
1
STATE OF SOUTH CAROLINA ) MEMORANDUM OF AGREEMENT
) WILLIAM HILTON PARKWAY
GATEWAYFOR STONEY HISTORIC
COUNTY OF BEAUFORT ) CORRIDOR COMMUNITY PROJECTS
THIS MEMORANDUM OF AGREEMENT FOR STONEY HISTORIC
COMMUNITY PROJECTS (“Agreement”) is made and entered into this ___ day of June
December 2024 (“Effective Date”) by and between the Town of Hilton Head Island, South Carolina
(the (“Town”), and Beaufort County, South Carolina ( the “County”); collectively hereinafter the
“Parties”.
WHEREAS, the U.S. Highway 278 (“Hwy 278”) corridor, extending from I -95 to Sea
Pines Circle, is of regional importance to the Town, the County, and the State of South Carolina in
facilitating trade, commerce, transportation of the local workforce, and the transportation of Town
residents, visitors, and workers throughout the entire region; and
WHEREAS, access to Hilton Head Island by vehicles is currently via Hwy 278, which
includes four bridges, being east and west bound bridges connecting the mainland with Pinckney
Island over Mackay Creek, and east and westbound bridges connecting Pinckney Island to Jenkins
Island over Skull Creek; and
WHEREAS, from Jenkins Island, Hwy 278 crosses a causeway to Hilton Head Island
whereby Hwy 278 is also known as William Hilton Parkway; and
WHEREAS, the South Carolina Department of Transportation (“SCDOT”) has inspected
the Karl S. Bowers eastbound bridge that spans Mackay Creek and has found this structure to be
structurally deficient and subject to continuing deterioration; and
WHEREAS, traffic entering and leaving Hilton Head Island on a daily basis has increased
over time, and the existing corridor does not efficiently handle the traffic in the corridor extending
from the intersection of Hwy 278 and Spanish Wells Road to the intersection of Hwy 278 and Moss
Creek Drive; and
WHEREAS, to address concerns posed by the deteriorating condition of the eastbound
Mackay Creek bridge, and the need to reduce congestion and provide safety improvements for the
entrance to Hilton Head Island, the County conducted a Transportation Sales Tax Referendum
(“Referendum”) that included a proposed project for the repair or replacement of all four bridges
and additional improvements to the Hwy 278 corridor from the intersection of Hwy 278 and Squire
Pope Road to the intersection of Hwy 278 and Moss Creek Drive, among other things; and
WHEREAS, following the adoption of the Referendum, the William Hilton Parkway
Gateway Corridor Project, collectively referred to herein as the “Project”, was created as a County
project for those improvements within the SCDOT owned right-of-way; and
ATTACHMENT 4
Page 42 of 58
2
WHEREAS, the Project will begin at the intersection of Hwy 278 and Moss Creek Drive
and run to the intersection of Hwy 278 and Spanish Wells and Wild Horse Roads as shown in
Exhibit 1 attached hereto and incorporated herein by reference; and
WHEREAS, the portion of the Project beginning at the point where the Skull Creek
bridges meet Jenkins Island and ending at the intersection of Hwy 278 and Spanish Wells and Wild
Horse Roads is located within the Town’s municipal limits. The portion of the Project within the
municipal limits of the Town, will impact the property owners and citizens of and visitors of the
Town; and
WHEREAS, access to Hilton Head Island by vehicles is currently via U.S. Highway 278,
which includes four bridges, being east and west bound bridges connecting the mainland with
Pinckney Island over Mackay Creek, and east and westbound bridges connecting Pinckney Island
to Jenkins Island over Skull Creek; and
WHEREAS, from Jenkins Island, U.S. Highway 278 crosses a causeway to Hilton Head
Island whereby U.S. Highway 278 is also known as William Hilton Parkway; and
WHEREAS, the South Carolina Department of Transportation has inspected the Karl S.
Bowers eastbound bridge that spans Mackay Creek and has found this structure to be structurally
deficient and subject to continuing deterioration; and
WHEREAS, traffic entering and leaving Hilton Head Island on a daily basis has increased
over time, and the existing corridor does not efficiently handle the traffic in the corridor extending
from the intersection of U.S. Highway 278 and Spanish Wells Road to the intersection of U.S.
Highway 278 and Moss Creek Drive; and
WHEREAS, to address concerns posed by the deteriorating condition of the eastbound
Mackay Creek bridge, and the need reduce congestion and provide safety improvements for the
entrance to Hilton Head Island the County conducted a Transportation Sales Tax Referendum that
included a proposed project for the repair and/or replacement of all four bridges and additional
improvements to the U.S. Highway 278 corridor from the intersection of U.S. Highway 278 and
Squire Pope Road to the intersection of U.S. Highway 278 and Moss Creek Drive, among other
things; and
WHEREAS, following the adoption of the Transportation Sales Tax Referendum by the
voters in Beaufort County the William Hilton Parkway Gateway Corridor Project, referred to
herein as the “Project,” was created as a County project for those improvements within the SCDOT
owned right of way; and
WHEREAS, the Project will begin at the intersection of U.S. Highway 278 and Moss
Creek Drive and run to the intersection of U.S. Highway 278 and Spanish Wells and Wild Horse
Roads as shown on Exhibit 1 which is attached to this Memorandum of Agreement, and which is
attached hereto and incorporated herein by reference; and
Page 43 of 58
3
WHEREAS, in 2019, the Town Council for the Town of Hilton Head Island, South
Carolina (the “Town Council”), created the U.S. 278 Gateway Corridor Committee which
developed a series of “Guiding Principles” to be utilized in developing the Project which were
formally adopted by Town Council on February 18, 2020; and
WHEREAS, the Project is now proposed to include the replacement of all four bridges
crossing Mackay Creek and Skull Creek to meet current design and safety code specifications,
improved transportation performance throughout the corridor and within all major intersections,
improved access to the Pinckney Island National Wildlife Refuge an d the C.C. Haigh, Jr. , boat
ramp; improvements to address pedestrian and bicyclist needs, and improvements to address
existing conditions within the corridor that are negatively affecting property owners and residents
of the Big and Little Stoney Historic Neighborhoods (herein, collectively, the “Stoney Historic
Community”), all of which are generally reflected in the revised project design plans shown in
Exhibit 2 to this Memorandum of Agreement which are attached hereto and are incorporated herein
by reference; and
WHEREAS, the part of the Project beginning at the point where the Skull Creek bridges
meet Jenkins Island and ending at the intersection of U.S. Highway 278 and Spanish Wells and
Wild Horse Roads is located within the Town’s municipal limits; and
WHEREAS, the Project as a whole including the part within the municipal limits of the
Town, will substantially impact the property owners and citizens of and visitors of the Town of
Hilton Head Island; and
WHEREAS, the properties located the Stoney Historic Community were designated as a
Traditional Cultural Property as a part of the National Environmental Policy Act (“NEPA”) process
in developing the Environmental Assessment and are reflected on a map attached hereto as Exhibit
3 to this Memorandum of AgreementAgreement and incorporated herein by reference; and,
WHEREAS, the U.S. Highway 278Hwy 278 corridor, extending from I -95 to Sea Pines
Circle, is of regional importance to the Town, the County, and the State of South Carolina in
facilitating trade, commerce, transportation of the local workforce, and the transportation of Hilton
Head Island residents, visitors, and workers throughout the entire region; and
WHEREAS, the Project is currently in the preliminary design stage and is working through
the NEPA process; and
WHEREAS, as part of the NEPA process, a Preferred Alternative for the Project was
identified by the SCDOT and presented at a public hearing held on July 22, 2021; and
WHEREAS, following the development of the Preferred Alternative, on October 12, 2021,
the Town Council approved suggested revisions to be formally incorporated into the Modified
Preferred Alternative; and
Page 44 of 58
4
WHEREAS, based upon public feedback and suggested revisions from the Town, SCDOT
presented a Modified Preferred Alternative at a public hearing held on March 3, 2022; and
WHEREAS, the County, as project sponsor, approved many of these recommendations
and they were formally incorporated into a Memorandum of Agreement that was approved on
October 4, 2022; and
WHEREAS, in response to a substantial number of additional comments made by the
residents of the Town and/or the County concerning the Project, the County and the TownParties
determined that, as a necessary condition precedent to making an informed decision on what
options for the Project are in the best interests of their citizens, property owners and residents, an
independent review (the “Independent Review”) should be perfo rmed by a qualified consultant;
and
WHEREAS, the Parties coordinated on the procurement, awarding, and execution of an
Independent Review with consultant CBB Transportation Engineers and Planners, which
presented its findings on October 17, 2023; and
WHEREAS, the County and the Town coordinated on the procurement, awarding, and
execution of an Independent Review with consultant CBB Transportation Engineers and
Planners, which presented its findings on October 17, 2023; and
WHEREAS, the Town subsequently procured an additional transportation engineering
firm, The Lochmueller Group, to conduct a Town managed Independent Study; and,
WHEREAS, the Town conducted an additional transportation engineering review . This
review was completed by the Lochmueller Group who presented its findings and recommendations
to the Town on June 17, 2024; and,
WHEREAS, Following completion and presentation of the aforementioned studies and
reviews, the Parties agree that final design is generally included in the Selected Alte rnative as
shown in Exhibit 2 attached hereto and incorporated herein by reference. The Selected Alternative
shows the Project consists of the replacement of all four bridges crossing Mackay Creek and Skull
Creek to meet current design and safety code specifications, improved transportation performance
throughout the corridor and within all major intersections, improved access to the Pinckney Island
National Wildlife Refuge and the C.C. Haigh, Jr., boat ramp, improvements to address pedestrian
and bicyclist needs, and improvements to address existing conditions within the corridor that are
negatively affecting property owners and residents of the Big and Little Stoney Historic
Neighborhoods (herein, collectively, the “Stoney Historic Community”); and
WHEREAS, to offset the impacts to the Stoney Historic Community, an
innovative program of renewal and economic opportunity commensurate with the existing impacts
Page 45 of 58
5
to the Stoney Historic Community’s social and economic vitality that have come about through
decades of right-of-way expansion, will established and implemented; and
WHEREAS, the Town and CountyParties find that the completion of things set out in this
Memorandum of AgreementAgreement are in the best interest of the Town and CountyParties, and
their citizens, residents, property owners and visitors; and,
WHEREAS, in order to successfully incorporate these actions and the recommendations
from the Independent Study, the Town and CountyParties are combining into this Memorandum
of AgreementAgreement those elements that have previously been agreed to by the Town and the
CountyParties in addition to all other requirements that the Town and County Parties have now
determined are integral to the Town’s municipal consent for the Project; and
WHEREAS, as an additional condition for the Town to grant its municipal consent for the
Project, the Parties hereby agree and enter into this Agreement with the express knowledge and
understanding that the incorporation and completion of these terms will be a con dition of Town’s
municipal consent for the Project.
WHEREAS, as a condition precedent for the Town to grant its municipal consent for the
Project, the County and Town hereby agree and enter into this Memorandum of Agreement with
the express knowledge and understanding that the incorporation and completion of these terms
will be a condition of Town’s municipal consent for the Project.
NOW, THEREFORE, the Parties do hereby agree as follows regarding the overall the
Stoney Historic Community improvements and economic stability: NOW, THEREFORE, for and
in consideration of the sum of One ($1.00) Dollar, each paid to the other, and the performance of
the mutual covenants exchanged herein, the receipt and sufficiency of which is acknowledged, the
County and the Town do hereby agree as follows regard ing the Project’s design, the pursuit of
neighborhood improvements, and the overall economic sustainability of the corridor:
1. STONEY HISTORIC COMMUNITY IMPROVEMENT.
a. It is acknowledged that there are significant impacts to the Stoney Historic Community (Exhibit
32) and the Traditional Cultural Properties that are located within the Project’s scope and for which,
proactive improvement measures must be undertaken, including the elements set forth in this
Agreement.
b. A Stoney Historic Community Economic Sustainability and Cultural Preservation Plan will be
created by the Town and implemented in conjunction with the Gullah Geechee Historic
Neighborhoods Community Development Corporation (“GGHN”)’and serve as a vision and action
plan. The 2003 Stoney Initiative Area Plan will serve as a guiding document for this effort.
c. A secure escrow account, reserve fund, contingency, or other mutually agreed form of funding of
at least Ten Million ($10,000,000.00) Dollars The Project will meet the environmental
commitments as defined in the NEPA documents. Parties agree that if Project funding is no longer
available the Parties will work jointly to provide necessary funding for completion of the projects
as described in this Agreement . Landscaping, lighting, and community sensitive signage will be
Page 46 of 58
6
installed throughout the Stoney Historic Community in order to provide this area with a clear sense
of place to elevate this portion of the Project. This will also include a review of existing highway
signage to determine if more appropriate alternatives c an be utilized that are sensitive to the
neighborhood context of the corridor.
for the Stoney Historic Community shall be established within the Project budget for elements that
include: landscaping, lighting, community sensitive signage, park improvements, and other
community infrastructure improvements.
d. Through the Gullah Geechee Historic Neighborhoods Community Development
CorporationGGHN, all parties will work directly with private property owners in the Stoney
Historic Community to alleviate roadway impacts and improve quality of life measures including
property access and property improvements.
e. As identified in the Selected Alternative (Exhibit 2), the Town It is has agreed that some portions
of Town-owned land may beare needed to reduce the impacts to the private property owners that
are located within the Stoney Historic Community and to adequately address other Project
elements. This use of Town-owned land may be for purposes of right -of-way acquisition, project
and wayfinding signage, landscaping, stormwater, or other similar Project purposes. Additionally,
the Town Council will evaluate the use of Town properties within the Project corridor to support
the efforts of the Gullah Geechee Historic Neighborhoods Community Development
CorporationGGHN in restoring economic opportunities within the Stoney Historic Community and
the overall stabilization of this neighborhood.
f. Parties agree to pursue Aa new park will be created south of U.S. Highway 278Hwy 278 in the
Stoney Historic Community to showcase the Gullah Geechee culture/heritage.
g. Drainage improvements will be constructed within the part of the corridor as shown in the Selected
Alternative (Exhibit 2) beginning where the bridge meets Jenkins Island and extending through the
Stoney Historic Community to the intersection of U.S. Highway 278 and Spanish Wells and Wild
Horse Roads to improve stormwater conveyance both as part of the Project and as a part of the
mitigation of any corresponding impacts to adjoining private properties.
h. Landscaping, lighting, and community sensitive signage will be installed throughout the
Stoney Historic Community in order to provide this area with a clear sense of place to elevate this
portion of the Project. This will also include a review of existing highway signage to determine if
more appropriate alternatives can be utilized that are sensitive to the neighborhood context of the
corridor.
h. Increased traffic and speed enforcement will be pursued within the area beginning at U.S. Highway
278Hwy 278 and Moss Creek Drive and continuing to the intersection of U.S. Highway 278Hwy
278 and Spanish Wells and Wild Horse Roads, including the bridges, Jenkins Island, and the Stoney
Historic Community areas.
Page 47 of 58
7
2. ECONOMIC STABILITY.
a. Evaluation of multi -modal transportation opportunities, including ferry options, park and ride
facilities, and other various modes of mass transit will be pursued to reduce travel demand for
vehicles through the corridor.
b. The acceleration of the evaluation of a second bridge to Hilton Head Island through the Lowcountry
Area Transportation Study (LATS) as outlined in the Long -Range Transportation Study for the
region is supported and will be pursued.
c. Any additional recommendations from the Independent Review and Study will be considered,
including those elements that may be outside of the defined Project area.
d. PAll parties will work cooperatively to seek the funding that will be necessary to implement the
proposed Project improvements and any additional elements that are identified outside of the
Project area.as described in this Agreement.
e. It is acknowledged that a Tax Increment Financing (“TIF”) District is a beneficial financial tool to
facilitate the investment in community infrastructure for the Skull Creek Planning District (Exhibit
4), which includes the Stoney Historic Community. All parties will work cooperatively to assess
and consider establishing a TIF District within twelve (12) months following the adoption of this
Agreement.of the Effective Date.
IN WITNESS WHEREOF, the Parties by and through their duly authorized officers, have
executed this Agreement on the Effective Date.
IN WITNESS WHEREOF, the Town of Hilton Head Island, South Carolina, and Beaufort
County, South Carolina, by and through their duly authorized officers, have executed this
Memorandum of Understanding on this ___day of June, 2024.
WITNESSES: TOWN OF HILTON HEAD ISLAND
_____________________________ By: __________________________
Name: Marc Orlando, Town
Manager
_____________________________ Title: Town Manager
WITNESSES: BEAUFORT COUNTY
_________________________ By: ___________________________
Page 48 of 58
8
Name:
_______________________Michael R. Moore , County Administrator
_____
_________________________ Title: County Administrator
Page 49 of 58
ATTACHMENT 5
Page 50 of 58
Page 51 of 58
Page 52 of 58
Page 53 of 58
Page 54 of 58
Page 55 of 58
ATTACHMENT 6
Page 56 of 58
ATTACHMENT 7
Page 57 of 58
Page 58 of 58