Town Council Meeting — Agenda Packet
Town of Hilton Head Island · Beaufort County · Town Council · meeting of Nov 12, 2024 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
Town Council Meeting
Tuesday, November 12, 2024, 3:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
There will be a reception honoring outgoing Town Council members following
today's meeting.
1. Call to Order
2. Pledge to the Flag
3. Invocation – Reverend Doctor Charles Kessler, North Island Baptist Church
4. Adoption of the Agenda
5. Approval of the Minutes
a. Regular Meeting Minutes of October 15, 2024
b. Workshop Minutes of October 22, 2024
c. Workshop Minutes of October 30, 2024
6. Executive Session
a. Discussion and Negotiations Incident to Proposed Contractual Arrangements
and Discussions for the Proposed Sale or Property [Pursuant to the South
Carolina Freedom of Information Act Section 30-4-70 (a)(1)] related to:
1. Easement Requests by the South Island Public Service District
a. Pope Avenue
b. William Hilton Parkway
c. Wexford Drive
Page 1 of 218
b. Discussion of Personnel Matters Relating to Town Manager Performance
Evaluation [Pursuant to South Carolina Freedom of Information Act 30-4-70
(a)(1)]
7. Action from Executive Session
8. Reports from Members of Town Council
a. General Reports from Town Council
b. Report of the Lowcountry Area Transportation Study – Glenn Stanford
c. Report of the Lowcountry Council of Governments – Tammy Becker
d. Report of the Beaufort County Airports Board – David Ames
e. Report of the Southern Lowcountry Regional Board – Glenn Stanford
f. Report of the Island Recreation Association Board – Alex Brown
g. Report of the Community Services and Public Safety Committee – Tammy
Becker
h. Report of the Public Planning Committee – David Ames
i. Report of the Finance and Administrative Committee – Alex Brown
9. New Business
a. Consideration of a Resolution Authorizing the Execution of Standardized
Stormwater Agreements for Broad Creek Landing, Ribaut Island, Paddocks on
Jarvis Creek, and Victoria Square - Jeff Netzinger, Director of Engineering and
Projects
10. Public Comment - Non Agenda Items
11. Presentations and Recognitions
a. Proclamation Acknowledging the Annual Thanksgiving Community Dinner
b. Commendation Acknowledging Service of Mayor Pro Tem David Ames
c. Commendation Acknowledging Service of Council Member Glenn Stanford
12. Adjournment
FOIA Compliance: Public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
Page 2 of 218
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 3 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 1 of 13
Town of Hilton Head Island
TOWN COUNCIL MEETING
Tuesday, October 15, 2024, 3:00 PM
Minutes
Call to Order
Mayor Perry called the meeting to order at 3:00 p.m.
Council Members present: Alan Perry, Mayor, David Ames, Ward 3, Mayor Pro-
Tempore; Alex Brown, Ward 1; Patsy Brison, Ward 2; Tammy Becker, Ward 4; Steve
Alfred, Ward 5; Glenn Stanford, Ward 6
Also present: Marc Orlando, Town Manager; Curtis Coltrane, Town Attorney; Kimberly
Gammon, Town Clerk
Invocation – Father Allan MacDonald, Holy Family Catholic Church
Father MacDonald delivered the invocation.
Adoption of the Agenda
Mr. Ames moved to approve. Mr. Alfred seconded. Motion carried 7-0.
Approval of the Minutes
Workshop Minutes of September 16, 2024
Regular Meeting Minutes of September 17, 2024
Workshop Minutes of September 24, 2024
Regular Meeting Minutes of October 1, 2024
Mr. Ames moved to approve the minutes listed above. Ms. Becker seconded.
Motion carried 7-0.
Report of the Town Manager
Mr. Orlando reported on the following:
Hurricane Helene
After assessing the damage caused by Hurricane Helene, it was decided to open a tree
and landscape debris site to assist residents and businesses with clean up.
1. In less than 24 hours Town Staff organized, communicated, and made
operational a drop off site at Coastal Discovery Museum.
2. The site was open for 5 days and collected 4,560 cubic yards of debris or 57
truck loads. (Need to update before TC - still hauling debris off site).
Page 4 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 2 of 13
Hargray Internet Outage
1. On September 23 Hargray experienced an internet connectivity outage that
impacted large parts of the Southeast.
2. The Town’s recent investment in internet redundancy resulted in our failed
internet connection switching over to our secondary connection within
approximately 10 seconds.
3. Without this network redundancy our operations and ability to communicate
would have been adversely impacted as it was for thousands of other
government entities, school systems, and businesses.
4. Thank you for Town Council’s support in making available resources that allow
us to make our Town more resilient.
Fire Rescue:
•SCTF-4 (Hilton Head/Bluffton Urban Search and Rescue Team) is currently
deployed to Greenville County, SC. Our crew are actively working to provide
search and rescue, damage assessment, and humanitarian aid to the region.
•Emergency Manager Tom Dunn is deployed to Anderson County through a State
Resource Request. Tom is acting as the Operations Section Chief in the
Anderson County EOC to give their team a couple of days’ relief.
Office of Cultural Affairs:
The Crescendo Celebration of Art and Culture is coming up.
•8 th annual Crescendo – runs through 11/23 – sponsored by the Office of Cultural
Affairs in partnership with the Arts Council of Hilton Head Island
•Annual celebration of Hilton Head Island’s unique history, cultural and arts
offerings.
•Over 100 performances, concerts, programs, tours, and hands on activities.
•30 different organizations are participating in this year’s celebration.
•Kickoff Celebration is 10/15 at Shelter Cove Community Park – 5:30 – 7:30 –
with Junior Jazz All Stars, Zach Stevens, and Grammy Award winner Charlton
Singleton performing.
IT:
We have been migrating staff to First Net, it is part of ATT and the first responder
network they have created. Our redundancy for our cellular service is having four
different ways to be able to have internet use, Hargray, Spectrum, StarLink and a
cellular modem. With smartphones they can use wifi for calling if you are unable to use
a cell tower to call out. We also have four satellite phones for emergency use.
Community Development:
Wendy Posey has joined the team as our Permits and Applications Manager. Wendy’s
experience in project management, customer service and leading professional teams
will help strengthen the team as we work to continually improve our permitting
process. We are already in the process of overhauling our reporting with her at the
helm.
Page 5 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 3 of 13
The Building Inspections Department has welcomed two new provisional inspectors to
our team. We are glad to have David Staigar and Kathryn Hickey, who both bring
extensive background in construction to build on as they work to become licensed
inspectors and reinforce our highly experienced inspection team. David brings a career
of construction project management and experience as a licensed contractor, and
Kathryn brings a background of real estate and project management, as well as a family
of builders from which she has gained rich knowledge and experience in
construction. We are glad to add Kathryn and David to our diverse team of inspectors
that work to ensure the safety of the residents and visitors of our island.
Town Government Day
October 9 was Town Government Day for the Hilton Head Island-Bluffton Chamber of
Commerce Leadership Program and class participants gained valuable insights into
how the Town functions and the services it provides to the community. The Town
presented on Town operations, planning initiatives, floodplain management, capital
improvement project management, stormwater utility management and emergency
operations planning & management.
Town presentations were made by Mayor Perry, Marc Orlando, Chief Blankenship, Tom
Dunn, Shari Mendrick, Scott Harris, Missy Luick and Cary Adams.
Additionally, the Town Government Day was organized by Town staff members: Russell
Rogers and Cinda Seamon.
General Reports from Town Council
Ms. Brison reviewed some upcoming events for the Crescendo, noting the Jazz Arts
Allstars will be performing this evening and her husband Scott Camp would be joining
them on piano. She encouraged all to attend. She noted events for Cancer Awareness
Month and encouraged all to support cancer awareness and organizations trying to fight
cancer. She added that the Association for Mental Illness is also having a walk on
October 26th encouraging all to participate.
Report of the Lowcountry Area Transportation Study – Glenn Stanford
Mr. Stanford reported the group met on October 4 th and discussed the announcement
regarding the 278 Corridor Project that the National Highway Administration has
accepted the plan and they are looking forward to receiving the Finding of No Significant
Impact this month so the project can move forward.
Report of the Lowcountry Council of Governments – Tammy Becker
No report.
Report of the Beaufort County Airports Board – David Ames
No report.
Report of the Southern Lowcountry Regional Board – Glenn Stanford
Mayor Perry reported the Board received an update from the Beaufort Jasper Housing
Page 6 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 4 of 13
Trust regarding moving forward with allocations of funds. He reported they are trying to
schedule a presentation for Town Council from the Beaufort Jasper Housing Trust. He
added that they received reports from the Child Care Subcommittee along with the Litter
Subcommittee. He stated they are in the early stages of formation and are trying to
build their directives to move forward.
Report of the Island Recreation Association Board – Alex Brown
Mr. Brown reported the Board hosted a successful forum on October 30 at the Island
Recreation Center. He stated the association was very pleased to hear the views of the
candidates for the future of parks and recreation. The Association, in conjunction with
the Kiwanis Club of Hilton Head a Chili Cook-Off which was a great success.
Report of the Community Services and Public Safety Committee – Tammy Becker
No report.
Report of the Public Planning Committee – David Ames
No report.
Report of the Finance and Administrative Committee – Alex Brown
The Finance & Administrative Committee met on September 24 th. There were two items
of business on the agenda.
•The first item was consideration of a resolution authorizing the execution of
standardized stormwater agreements for Broad Creek Landing, Paddocks on
Jarvis Creek, Ribaut Island, and Victoria Square. The decision was made to
move the resolution to the full Town Council for consideration by way of
unanimous vote from the Committee.
•The second item was the monthly financial report and presentation as of August
31st. The report included fiscal year 2025 consolidated preliminary year to date
results, a fund balance analysis, budget amendment overview and proposed
Capital Improvements Program carry forwards.
Unfinished Business
Consideration of an Ordinance to Amend the Town of Hilton Head Island Budget for the
Fiscal Year Ending June 30, 2025; to Provide for the Budgeted Appropriations of the
Prior Year Budget Roll Forward and Certain Other Appropriations and Commitments
and the Expenditures of Certain Funds; to Allocate the Sources of Revenue for the Said
Funds; and to Provide for Severability and an Effective Date - Second and Final
Reading - Adriana Burnett, Finance Director
Ms. Burnett explained this was the second reading of the ordinance and there have
been no changes since the first reading on October 1.
There were no public comment requests for this item.
Mr. Ames moved to approve. Ms. Becker seconded. Motion carried 7-0.
Page 7 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 5 of 13
Consideration of a Resolution Adopting a Beach Parking Fee Schedule - Shawn
Leininger, Assistant Town Manager-
Mayor Perry asked Council to not rescind the motion adopting the resolution that was
made on September 17, 2024 but discuss having a clear understanding of parking
issues within the business district of Pope Avenue and Coligny area.
Ms. Brison addressed her issues of concern within the resolution. She noted the
second Whereas that states the recommendations from the Town Community Services
and Public Safety Committee reflected are alternative options for the Town Council to
consider and are stated as such below. She stated that does not exist in this resolution.
Secondly, the next Whereas which states after determining which option the Council
wishes to adopt, this resolution will be amended to reflect these selections prior to its
execution. She stated she felt that is not appropriate. She stated they should either go
back to the first Whereas which states Town Council has the authority to establish
parking fees within paid parking areas pursuant to Section 12-6-112 which did not exist
when this resolution was signed. In addition, under Section 1, Subsection A, refers to
something called the Pope Avenue Business Corridor she stated no such definition
exists. Subsection B says during all seasons for youth recreational sports and no such
definition exists. Ms. Brison stated she asks these questions about this resolution was
adopted which was made by motion and the code which was adopted says that it is to
be adopted by resolution. She asked that the questions be answered before
proceeding.
Mayor Perry asked Mr. Coltrane to address the questions.
Mr. Coltrane stated the resolution becomes effective by its terms on the 1 st day of
January 2025. The Code section that is referenced in the first recital also becomes
effective on January 1, 2025, so at the time that each of these documents become
effective, both will exist at the same time in the same place so he did not see it as an
issue.
Mr. Coltrane added that in the recitals don’t have any real impact on what is in the body
of the resolution itself with respect to the resolution itself. He agreed there is not a
stated definition itself regarding the Pope Avenue business Corridor but as he
understood the conversation, there appeared to be a general agreement that they were
talking about Pope Avenue east of Cordillo Parking meaning the section where there is,
at this moment, one parking lot owned by the Town that is Pope Avenue east of Cordillo
and that is the one that would be affected by this text. Parking at Chaplin Beach Park is
the text of the proposed amendment of Mr. Brown and there was no effort to define that.
He noted Island Recreation Center runs sporting events and it is an issue that can be
arranged through communication with the Island Recreation Center as to when the
youth sports are on. He added that it is hard to disagree that defining sometimes is
better than not defining but he felt the process is in place to where the Town will know
when those are taking place..
Mr. Coltrane stated it is a resolution. There was a resolution on the table when Mr.
Page 8 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 6 of 13
Brown moved to amend it and what is before you is the resolution that was made as
amended. He added that the Town does not require a resolution to be in writing.
Ms. Brison stated there was a resolution set before them which was not amended by a
motion. Instead, there was a motion and the code amendment that was adopted
requires it to be a resolution. She stated she was not asking to revoke the intent of this
but the resolution needs to be cleaned up because it is going to be part of the Town
records. Mayor Perry stated her comments were duly noted.
There were no public comment requests regarding this item.
Mr. Ames moved that Council request the Mayor and Town Manager form an ad
hoc working group with the responsibility of studying the Coligny/Pope Avenue
area parking environment. The committee will be comprised of representatives
from the Town including the Ward 3 representative and business owners of the
area. The committee will be an even number of no less than 4 and no greater
than 6 members, equally divided between the Town and business owners. It will
be the committee's responsibility to identify relevant data opportunities to include
capacity, distribution of cost, enforcement, potential capital improvements,
among other needs it may raise. The committee will present the final report on or
before September 30, 2025. Mr. Alfred seconded.
Ms. Brison moved to amend the motion to include residents who are not Town
Council members and not business owners. Mr. Ames seconded. Motion failed
2-5 (Perry, Ames, Brown, Alfred, Stanford against).
Mr. Ames moved to amend the original motion to add having the ad hoc group set
up by November 30, 2024. Mr. Stanford seconded. Motion carried 6-1.
Mr. Ames original motion, as amended carried 6-1 (Brison opposed).
New Business
Consideration of a Resolution to adopt the 2024 Repetitive Loss Area Analysis as
required for the Federal Emergency Management Agency’s Community Rating System -
Missy Luick, Director of Planning
Ms. Luick stated Town has actively participated in the Community Rating System (CRS)
program since October 1, 1991. The Town is currently a Class 5 Community, which
gives its residents in the Special Flood Hazard Area (SFHA) a 25% discount on their
flood insurance premiums. Currently, the Town has 23,697 NFIP Flood Insurance
policies enforced with a savings of $3,079,690.
Although the regional 2020 Natural Hazard Mitigation Plan was approved by FEMA, it
did not meet the CRS requirement for communities with greater than 50 repetitive loss
properties. The RLAA was developed to satisfy a prerequisite for CRS communities
with greater than 50 repetitive loss properties to maintain the 25% CRS discount on
FEMA Flood Insurance Premiums.
Page 9 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 7 of 13
The purpose of the RLAA is to assess the potential causes of flooding in areas that
have historically flooded and properties with repeated flood losses. The RLAA
document is an analysis of site-specific details, such as structure’s finish floor height,
exterior a/c units, grades, plus nearby storm water inlets, catch basins and drainage
waterway features. The results of the assessment are used to develop
recommendations for appropriate mitigation strategies to reduce or eliminate future
flood losses. There is no mandate for property owners to mitigate flood risk; however
the RLAA provides a guide and resources available to property owners to make
improvements and protect their property.
The RLAA is a critical element of the Community Rating System (CRS), which is used
to establish National Flood Insurance Program (NFIP) premium rates for Town
Residents.
The RLAA document is made up of two sections:
1)Repetitive Loss Area Analysis which includes mapping of 25 repetitive
loss areas within the Town with 982 properties included within the RLAA
which results in the Town being designated as a Category C community;
2)The RLAA Planning Process which includes outreach to all properties in
the repetitive loss area, contact with agencies and organizations, site visits
to each building within the repetitive loss area, review of alternatives and
documentation of findings and mitigation.
The RLAA is intended to serve as a guide and provide resources available to property
owners interested in protecting their property against future flood losses. The RLAA will
be evaluated on an annual basis, and more thoroughly reexamined prior to a
Community Rating System verification visit. The annual evaluation will entail a thorough
reanalysis and survey of conditions in each Repetitive Loss Area, an analysis of the
progress on recommended actions, and to what extent mitigation or building mitigation
activities have occurred.
On September 12, 2024, the Public Planning Committee voted unanimously (4-0) to
recommend Town Council consider adoption of the RLAA.
Mr. Ames moved to approve. Ms. Brison seconded.
Ms. Brison stated this is one of the most useful reports she’s seen. She noted the
examples and ways to mitigate are very helpful. She joined Mr. Ames in suggesting
that residents take a look at it and asked that the Town place it on our website to alert
residents to this information. She noted that while it’s not mandatory there are
suggestions to take into consideration. She also pointed out that Town staff can actually
come out and look at the sites and provide some assistance which is very helpful to
residents.
There were no public comment requests regarding this item
Page 10 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 8 of 13
Motion carried 7-0.
Consideration of a Resolution Adopting Environmentally Friendly Landscaping and
Grounds Maintenance Practices/Integrated Pest Management Policy - Shawn Leininger,
Assistant Town Manager
Mr. Leininger conducted the following presentation:
Environmental Sustainability is identified as a focus area in the Town Council approved
2023-2025 Strategic Action Plan and includes the Assessment and Implementation of
an Environmentally Friendly Landscape and Grounds Maintenance Best Practices
Program as an additional strategy.
The development of an Integrated Pest Management (IPM) policy is a best practice for
management of grounds and facilities. In general terms, an IPM policy is a
decisionmaking strategy that combines biological, cultural, physical, and chemical tools
aimed on the long-term prevention of pests (plants and animals) or their damage.
Following this strategy, pest control materials are selected and applied in a manner that
minimizes risks to human health and nontarget organisms, is beneficial, and helps
protect the environment.
In developing an IPM policy, Town Staff assessed current Town practices along with
other environmentally conscious landscaping practices relating to pest and weed control
management practices and products. Additionally, Town Staff met with certified
professionals; other municipalities; local, state and national leaders in this field;
representatives of the Non-Toxic Neighborhoods organization; as well as Town
landscaping contractors to review these strategies and best practices.
Through this research and evaluation, three policy goals were established to guide the
development of an IPM policy. These included the following:
1. Reduce / eliminate pesticide use.
2. Provide notice to the public when pesticides are used in public spaces.
3. Ensure the Town is responsible for making pest management decisions.
IPM POLICY OVERVIEW:
The proposed IPM Policy (Attachment 2), as reviewed and forwarded to Town Council
by unanimous vote (4-0) of the Community Services & Public Safety Committee
(CSPSC), establishes an organic first, least toxic approach to pest management on
Town owned and managed properties. This means the use of preventative measures
(i.e., selection of appropriate plant materials, physical removal of the pest, etc.) are
prioritized before pesticide controls are implemented. When pesticide controls are
necessary, organic pesticides are prioritized before considering synthetics. Pesticides
that are registered with the United States Environmental Protection Agency (EPA) will
be used in a least toxic approach. This results in EPA Level III (caution) pesticides, the
lowest EPA toxicity level, being utilized first before considering more toxic pesticides as
identified by the EPA.
Following the stated policy goals and organic first, least toxic approach, the IPM Policy
Page 11 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 9 of 13
further establishes the following:
1. Makes clear that existing service contracts that are not compliant with the IPM Policy
will either be amended or terminated, and a new contract will be issued within twelve
(12) months following adoption of the IPM Policy.
2. Prioritizes pest prevention beginning at the design stage and continues with the use
of non-pesticide controls first.
3. Establishes that the Town is the approval authority of all pest control measures and
institutes a written approval process.
4. Prohibits the use of any pesticide containing a substance known to be a human
carcinogen as listed on the United States Department of Health and Human Services,
Public Health Service, Report on Carcinogens Section.
5. Prohibits the use of Glyphosate products (Roundup, Ranger Pro, etc.). 6. Prohibits
the use of EPA Level I (danger) pesticides unless it is deemed necessary to protect
public health and prevent economic loss when other methods do not adequately control
the pest.
7. Requires pesticide applications to be appropriate for the target pest and must be
applied by those persons possessing a valid South Carolina commercial applicator
license; or supervised by a person possessing such license.
8. When pesticide controls are necessary, identifies which pesticides, following the
defined organic first, least toxic approach, can be applied on Town properties (park,
field, playground, dog park, right-of-way, facilities/ buildings, and other Town property).
9. Requires notice be posted forty-eight (48) hours prior to pesticide application and the
notice remain in place for at least twenty-four (24) hours after the application, unless the
product label requires a longer re-entry period.
10. Requires all pesticide application records be provided to the Town by the contractor.
11. Requires the Town to develop and implement public education and outreach
programs about the Town’s IPM Policy, including collaborating with community
organizations.
12. Requires the IPM Policy to be reviewed and evaluated periodically by Town Staff to
assess its effectiveness, to identify opportunities for improvement, and make changes
as necessary.
COMMUNITY SERVICES & PUBLIC SAFETY COMMITTEE (CSPSC) REVIEW:
The CSPSC has met numerous times over the past year to review and provide
comment on the IPM Policy. These meetings included the following:
1. November 13, 2023;
2. January 8, 2024;
3. February 12, 2024;
4. April 8, 2024; and
Page 12 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 10 of 13
5. September 16, 2024.
At the most recent meeting held on September 16, 2024, the CSPSC reviewed the IPM
Policy. At that meeting, representatives of the Non-Toxic Neighborhoods organization
provided additional revisions for consideration by the Committee (Attachment 3). In the
motion forwarding the resolution and proposed IPM Policy to Town Council, the
Committee requested Town Staff evaluate and report on those revisions to Town
Council.
Below is a summary of the proposed revisions along with the corresponding evaluation
from Town Staff:
Non-Toxic Neighborhoods Request
Requested to remove "least toxic" from the policy and remove how toxicity is defined.
Proposed modifications:
Town of Hilton Head Response
1. Added the phrase “organic first” to better reflect the approach and retained the term
“least toxic” as an appropriate descriptor of the IPM Policy.
2. No change to determining how toxicity is defined.
The proposed IPM Policy requires the practice of preventative measures and non-
pesticide controls such as cultural, mechanical, and biological before the use of
pesticides are needed. When pesticides are deemed necessary by Town Staff, the
policy requires the use of organic pesticides first following a "least toxic approach.
Synthetic pesticides may be applied if all other control measures are ineffective.
For clarification, the EPA identifies how toxic a chemical is based on toxicology studies
on oral, inhalation, and dermal exposure of the formulation of the product. The EPA
then uses the study with the highest toxicity to identify the Signal Word and that Signal
Word is printed on the label of the product. The Town's policy follows a "least toxic"
approach and therefore needs to define how toxicity is identified.
Non-Toxic Neighborhoods Request
Requested that chemicals are identified as pesticides.
Town of Hilton Head Response
Proposed modification:
1. Where appropriate, the term "chemicals" has been changed to pesticides.
Non-Toxic Neighborhoods Request
Requested a licensed pest control advisor and Town Staff determine when use of
synthetic pesticides is necessary to protect public health or prevent economic loss.
Town of Hilton Head Response
Proposed modification:
Page 13 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 11 of 13
1. None.
As stated in the policy, Town Staff shall be the decision maker of pest management
decisions and will determine when use of synthetic pesticides is necessary to protect
public health or prevent economic loss.
Non-Toxic Neighborhoods Request
Requested to remove any language that would suggest that organic pesticides may not
be effective.
Town of Hilton Head Response
Proposed modification:
1. Removed language that suggests organic pesticides may not be effective as it was
not the intent, and the language was determined to be unnecessary.
Non-Toxic Neighborhoods Request
Requested to have beaches, parks, athletic fields, dog parks, and playgrounds to be
treated with same methodology - an organic pesticide only approach unless necessary
to protect public health or prevent economic loss.
Town of Hilton Head Response
Proposed modification:
1. When pesticides are necessary, implement an organic pesticide only approach on
beaches, playgrounds, and dog parks unless organic pesticides are unable to protect
public health or prevent economic loss.
2. No change for parks, athletic fields, rights-of-way, facilities and buildings, and other
town properties.
Requiring a threshold to use synthetic pesticides at the protection of public health or
prevention of economic loss may impact the aesthetic desired by the Town and the
playability of athletic fields. Organic pesticides will be utilized first to control pests. If the
organic pesticides are not effective and the impact of the pest does not rise to the level
of public health or economic loss issue, the Town needs additional resources to
satisfactorily address the issue.
Based on Town Staff review of the Non-Toxic Neighborhoods organization proposed
revisions as directed by the Committee, a revised IPM Policy incorporating the changes
noted above has been prepared utilizing track changes. Should Town Council approve
of these additional changes, this revised IPM Policy needs to replace the IPM Policy
forwarded by the CSPSC that is incorporated with the Resolution.
Adoption of an IPM Policy by Town Council will implement a Strategic Plan item and for
the first time establish a decision-making strategy for the management of pests on Town
owned and managed properties that minimizes risks to human health, beneficial and
nontarget organisms, and the environment and fulfills the policy goals established in
creating an IPM policy. This policy will be periodically reviewed, assessed for
Page 14 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 12 of 13
effectiveness in meeting these goals, and updated as necessary. Immediate next steps
include:
1. Reviewing and making all applicable service contracts compliant with the adopted
IPM Policy on or before October 16, 2025;
2. Developing IPM Programs for Town owned and managed properties;
3. Establishing procedures for providing Town authorization, maintaining records, and
for placement of notifications of pesticide applications; and
4. In one-year, completing a Town Staff review of the IPM Policy to assess its
effectiveness, to identify opportunities for improvement.
Mayor Perry asked if anyone signed up for public comment regarding this item. Those
that signed up for public comment and their comments are listed below:
Pamela Martin Ovens addressed Council encouraging them to vote for the IPM with the
corrections made in green by Kim Conti and herself. She thanked the members of the
Community Services and Public Safety Committee for their dedicated work.
Kim Konte addressed Council encouraging them to approve the revisions suggested for
the IPM. She expressed her concern regarding many parks receiving toxic applications
daily.
Jen Bialocki addressed Council urging them to adopt the policy with the suggested
revisions.
Ms. Brison moved to adopt Attachment 4, which staff has revised with the
amendments not included in the Non-Toxic Neighborhood revisions. She clarified
that it would include any other Non-Toxic revisions that are not made in the staff
recommendation to be included. (noted in green on Attachment 3). Ms. Brison
clarified her motion includes all of the staff changes and the ones submitted by
Non-Toxic Neighborhoods. Mr. Ames seconded.
Following detailed discussion regarding the suggested revisions, the motion
failed 1-6 (Perry, Brown, Ames, Becker, Alfred and Stanford against).
Mr. Ames moved that Town Council adopt the Environmentally Landscaping
Ground Maintenance Practice Integrated Pest Management Policy with the
addition of parks and athletic fields in the same category as beaches, parks,
playgrounds and dog parks. Ms. Brison seconded. Motion carried 7-0.
Public Comment
Amber Kuehn addressed Council expressing her appreciation for their support
throughout the years. She thanked Mr. Ames for his mentoring and for providing her
with an education regarding municipal government.
Terry Hall addressed Council regarding the flooding of him home at 17 Bay Pines Drive.
He stated he would like to move back into his home and encouraged Council to
consider and openly suggest all potential options to resolve or work through the process
Page 15 of 218
Town of Hilton Head Island Town Council
Meeting Minutes
10/15/2024
Page 13 of 13
of obtaining the grant to return to their home.
Tom Reitz addressed Council in support of Mr. Hall and encouraged Council to work
with the County to help mitigate what the Hall’s are going through.
Executive Session
Discussion of Negotiations Incident to Proposed Contractual Arrangements and
Discussions for the Proposed Sale or Purchase of Property (Pursuant to the South
Carolina Freedom of Information Act Section 30-4-70 (a)(1)) related to:
1. Jonesville Road Area
2. Bay Pines Road Area FEMA Grant Agreement
3. Audubon Pond Road Area FEMA Grant Agreement
4. Easement Requests by the South Island Public Service District
a. Pope Avenue
b. William Hilton Parkway
c. Wexford Drive
Discussion of Appointment to Boards, Commissions, and Committees [Pursuant to the
South Carolina Freedom of Information Act Section 30-4-70(a)(1)] related to:
4. Citizen's Oversight Committee of 2024 Sales and Use Tax Projects
At 5:24 p.m. Mr. Ames moved to enter into Executive Session for the purposes
stated by the Town Manager listed above. Ms. Brison seconded. Motion carried
7-0.
At 5:30 p.m. Mr. Ames moved to end Executive Session and return to the regular
meeting. Ms. Becker seconded. Motion carried 7-0.
Action from Executive Session
No Action taken.
Adjournment
The meeting was adjourned at 5:40 p.m.
Approved:
Kimberly Gammon, Town Clerk
Alan R. Perry, Mayor
The recording of this Meeting can be found on the Town’s website at
www.hiltonheadislandsc.gov
Page 16 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/22/2024 Page 1 of 8
Town of Hilton Head Island
TOWN COUNCIL MEETING
Tuesday, October 15, 2024, 3:00 PM
Minutes
Call to Order
Mayor Perry called the meeting to order at 1:00 p.m.
Council Members present: Alan Perry, Mayor, David Ames, Ward 3, Mayor Pro-
Tempore; Alex Brown, Ward 1; Patsy Brison, Ward 2 (arrived at 1:02 p.m.); Tammy
Becker, Ward 4; Steve Alfred, Ward 5; Glenn Stanford, Ward 6
Also present: Marc Orlando, Town Manager; Curtis Coltrane, Town Attorney; Kimberly
Gammon, Town Clerk
Representatives from MKSK, Toole Design and Kimley Horn
Adoption of the Agenda
Mr. Ames moved to approve. Mr. Stanford seconded. Motion carried 6-0 (Brison
was not yet in attendance).
Adaptive Signal System Update - Shawn Colin, Assistant Town Manager
Mr. Colin conducted a detailed presentation updating Council regarding the project. He
provided an update overview of the following:
Project Goals and Objectives:
•Improved the reliability of travel along the project corridors at all times of day
•Maintained a consistent level of service along the project corridors during peak
hour operations
•Staff can manage and monitor the traffic signal system remotely in real time
•The system enhanced vehicle detection, communication, and alarm notification
•The project formed a foundation to develop an overall Advanced Traffic
Management System (ATMS)
Before and After Results
•SCDOT Study states mainline travel times have been reduced by 3%.
•Eastbound AM peak
•36 second travel time reduction (Squire Pope Road to Beach City Road 2.7
miles / Free flow travel time at 45mph is 216 seconds)
•15 second travel time reduction (Mathews Drive to Queens Way 4.3 miles / Free
flow travel time at 45mph is 344 seconds)
•Westbound PM peak
•45 second travel time reduction (Queens Way to Mathews Drive 4.3 miles / Free
Page 17 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/22/2024 Page 2 of 8
flow travel time at 45mph is 344 seconds)
•8 second travel time reduction (Beach City Road to Squire Pope Road 2.7miles/
Free flow travel time at 45mph is 216 seconds)
Improvements to System Functionality
•Overall system functionality has improved dramatically over the last month.
oStaff has seen a reduction in the number of citizen concerns over the last
two months. (Phone calls, emails, MyHHI (SeeClickFix) requests
down)10 SeeClickFix requests in July
o13 SeeClickFix requests in August
o3 SeeClickFix requests in September
•In August, Town staff worked with adaptive system manufacturer and the
contractor to improve operational and equipment resiliency, including the
following:
•Installed more reliable grounding to radar equipment
•Improved signal operations through modifying traffic signal controller settings
•Improved radar detection reliability by upgrading the radar firmware
•Improved radar detection by modifying some radar locations
•The system performed well with recent storm events
Proactive Continuous Improvements
•Staff has been proactively implementing strategies to increase signal
performance.
•Focusing on reducing the probability of short green times
•Examining individual intersections and changing actual inputs to the controller
from theoretical inputs to actual “real life” inputs
•Modifying signal system timing to assist with traffic flow for community special
events
•Addressing unique vehicle characteristics like school buses
Fiber Optics Communication
•Provides more reliable consistent communication with less disruptions
•Fiber lines offer redundancy over radio and cellular communication
•Fiber lines offer a consistent signal
•Fiber lines would reduce maintenance currently required by our radio
communication system in terms of line-of-sight tree trimming
•IT department has evaluated the fiber costs to service the signals system
•Estimated Cost to rent dedicated fiber line space from Sparklight (Hargray) is
$30,000 per year and would take approximately 6 months to implement
•Town staff is advancing this effort to connect to fiber 11
Windmill Harbor Signal
•Letter sent to Beaufort County on June 24, 2024, requesting the signal be
transferred to Town ownership for inclusion in the Town’s traffic signal inventory
and ATSM network
•The letter also requested that Beaufort County fund the capital improvements
Page 18 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/22/2024 Page 3 of 8
necessary to upgrade the signal to be compatible with the ATSM network.
(Estimated costs +/- $70,000)
Mr. Colin concluded with detailed information on how citizens can contact the Town with
traffic signal concerns.
Council members held discussion, asked questions and made comments regarding:
inquiry into number of signals and confirmation there are 25 and will be 26 if Windmill
Harbor is added; confirmation it will be more interactive when fiber optic is completed; a
statement of support for the project and the need for Windmill Harbor to be included;
inquiry and suggestion that Moss Creek signal be integrated into the plan; inquiry as to
whether additional support staff should be added; a suggestion to look at other ways to
measure effectiveness; concern over challenges with fiber optic system and inquiry as
to what is the back-up plan; confirmation there is a back-up plan; suggestion to monitor
community events and adjust the system for such and create a standard operating
procedure; inquiry as to how the Town will keep up with upgrades; inquiry into the need
for battery back-ups; confirmation the system is always being assessed by staff as well
as citizens; a comment that the environmental impact will be improved as cars
movement is improved; suggestion of cross training staff for connectivity; the need to
know the number of people traveling in cars as they enter; measurements are needed
for effectiveness of the system; and the need to look at redundancy from a system and
staff standpoint.
Major Thoroughfares Corridor Plan - Shawn Colin, Assistant Town Manager
William Hilton Parkway - Beach City Road to Dillon Road – Implementation
Mr. Colin conducted a detailed presented regarding the Northridge Area Improvements
Project Update with the following:
Overview
Town Council Strategic Action Plan Priority
•William Hilton Parkway Segment 3 from Beach City Road to Dillion Road has
historically been the area where the highest frequency of accidents involving
bicyclists/pedestrians with motor vehicles.
•Speed limit, inconsistent intersection pavement markings, crossing angles,
signage, and lighting along with lack of median plantings to restrict uncontrolled
crossings were evaluated to identify opportunities for improvements.
Existing Conditions
•Posted Speed Limit – 45mph
•3 signalized intersections with differing treatments for striping and crosswalk
alignment
•2 unsignalized intersections with differing treatments
•No pathway lighting
•Inconsistent pathway signage
He conducted a detailed review of the existing conditions which included an
Page 19 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/22/2024 Page 4 of 8
uncontrolled crossing in Northridge Area and an open median with no restriction to
uncontrolled crossings.
Scope, Funding and Timeline Scope:
•Reduce posted speed limit to 40mph
•Restripe and realign crosswalks and intersection pavement markings
•Install RRFBs at 2 locations to improve safety and awareness of bike/ped
crossings
•Provide consistent signage throughout corridor for roadway and pathway
•Install bollard lighting along pathways and at uplighting of landscaping and
corners of intersections
•Repair and deficiencies in roadway and pathways
•Install plantings in existing medians to deter crossings at uncontrolled locations
•Enhance landscaping along pathway edges
•Install ADA compliant treatments throughout corridor
•Improve Pathway Kiosks at Beach City Road, Mathews Drive and Dillon Road
•Improve Special Event Sign located on westbound William Hilton Parkway near
Beach City Road
Funding:
•The Town Council authorized the Town to execute an Intergovernmental
Agreement with Beaufort County to fund up to $600,000 toward safety
improvements for this project
•The approved Town CIP program includes additional funding for pathway
maintenance and improvements, roadway maintenance and improvements,
landscape and lighting, as well as island-wide pavement markings that will
contribute to the execution at an approximate cost of $700,000
Timeline:
Permitting: May 2024-October 2024; Construction: September 2024-January 2025;
Closeout: February 2025
Council members held discussion, asked questions and made comments regarding:
inquiry into the timing of the 40mph speed limit change; the need for all forms of
communication with residents regarding speed limit change; concern over the
uplighting; importance of communication with the community and have warning signs
ahead of the signals in English and Spanish; a suggestion of going out into the
community and distributing fliers; a suggestion to communicate with bike shops and
ambassadors regarding the changes; request for an update on the request to add Dillon
Road; inquiry as to improvements to all intersections; clarification that county funds go
to both projects; the need to use social media as we get closer to implementation; a
suggestion to ask the Sheriff’s office to provide a detailed report after implementation; a
suggestion to check out alternative traffic calming features; the need to be cognizant of
too much signage; a suggestion to explore the idea of creating place, name and
character of the area; and concern over medians that have no landscaping and when
they will be addressed.
Page 20 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/22/2024 Page 5 of 8
Major Thoroughfares Corridor Plan Presentation
The items below were addressed through a presentation by Brian Kinzelman of MKSK,
Jonathan Guy of Kimberly Horn and Addie Webb of Toole Design.
It was explained the following were the objectives and guiding principles:
•Improve safety for all modes of travel
•Reduce conflict points for all modes of travel
•Increase mobility for all modes of travel
•Establish a contiguous corridor aesthetic
There was a review of existing conditions and an assessment of needed improvements
regarding each of the areas which can be found in detail on the presentation on our
website:
https://hiltonheadislandsc.gov/corridor/presentations/MajorThoroughfaresCorridorPlan_
10-22-2024.pdf
William Hilton Parkway - Folly Field Road to Shelter Cove Lane
What was heard:
• Inconsistent signalized intersection treatments
• Minimal separation between northern sidewalk and roadway
• Lack of landscaped medians
• Numerous driveways and conflict-prone left turn movements
• Bike and pedestrian crossing conflict points
• Safety must be a priority in the Chaplin historic neighborhood
The presentation continued with a review of existing conditions, and suggestions for
general improvements, pedestrian improvements, vehicular improvements.
Council members held discussion, asked questions and made comments regarding: the
large number of curb cuts and turns through the area; discussion regarding shifting 278
to some town-owned property and creating a frontage road or shared drive for property
owners to access 278; a confirmation that town-owned land will assist in reconfiguring
the roadway and pathways; a concern for stakeholders reaction to curb cuts being
eliminated and a need for options; a need to revisit signalization for turns in that area; a
comment that by using town-owned land a parkway feel will be implemented; the need
to standardize signage; clarification regarding the shift in the roadway to assist in
relocating access to and from 278; concern over an additional traffic signal in the area
of Burkes Beach Road; the need to address the pavement between Folly Field Road
and Shelter Cove with landscaping; the need to improve safety and traffic at Burkes
Beach Road; support for the elimination of the slip lane at Mathews Drive; the need for
clear direction for pedestrian and bicycle crossings in the area; inquiry regarding the
right turn lane from 278 on to Folly Field Road and the need to allow pedestrians and
bicyclist to cross safely; a suggestion to eliminate right turn on red in that area; a need
to increase pathway sizes throughout the corridor; a consensus that Council is wiling to
review suggestions as long as stakeholders are considered throughout the process;
clarification of the width needed to shift the roadway; and inquiry as to whether a
Page 21 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/22/2024 Page 6 of 8
request for reduction in the speed limit will be considered.
Due to a prior commitment, Ms. Brison had to leave the meeting at 3:05 p.m.
Sea Pines Circle
What was heard:
• Backups occur at AM, PM, and Mid-day peak hours
• Area experiences high crash volumes
• Asymmetric alignment of approaches causes congestion on Greenwood Drive
• Significant traffic backups exiting Sea Pines
• Vehicles move through the circle at higher speeds
• Many conflict points in approaches to Sea Pines Circle
• Lack of clear signage to indicate circle navigation
• Pedestrian/bicycle safety and interconnectivity needs improvement
• Not enough capacity in the circle
The presentation continued with a review of the approach to analysis, background on
crash patterns and type, background on SCDOT historical count data, background on
peak hour counts, background on feeder road peak hour counts, background on 2024
peak hour counts, existing queue observations, and existing circle findings and
observations, suggestions for short term Sea Pines Circle vehicular improvements, long
term Sea Pines Circle vehicular improvements; operational analysis alternatives, other
options to be considered, and long term pedestrian improvements.
Council members held discussion, asked questions and made comments regarding: the
need to look at short term options that will drive the long term ones; concern over the
dual lane suggestion within the circle; a suggestion to utilize the adaptive signal system
to assist; inquiry and confirmation regarding the ability of Fire/Rescue vehicle moving
over the speed tables without hesitation; and inquiry regarding shifting the circle by 25
feet to assist and the need to look at that option.
It was the consensus of Council to hold off on the discussion of the suggested long-term
solutions with keeping the short-term ones in the forefront. It was decided many of the
short term recommendations will be advanced and feedback will be brought back to
Council. It was agreed they would discuss all long-term solutions at another time.
Palmetto Bay Road
What was heard:
• Current design leads to high speed roadway similar to Cross Island Parkway
• Minimal pedestrian buffer make pathways uncomfortable
• Lack of landscaped medians
• Numerous driveways and unsignalized intersections create conflict points
• Limited bike and pedestrian crossings
The presentation continued with a review of existing conditions, pathways and
crossings, intersection safety, drive access and connectivity, roadway layout, and an
option for consideration,
Page 22 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/22/2024 Page 7 of 8
Council members held discussion, asked questions and made comments regarding: the
need to provide safer access to areas; the need to enhance it as the entrance to the
South end of the Island and Sea Pines Circle; the need to address speed; the need for
landscaping in the median, discussion of a on-street bike lane in the area; the need to
address no left turns and access points and a suggestion to plan the roadway as they
are planning the district.
Pope Ave/Coligny Circle
What was heard:
• Inconsistent signalized intersection treatment
• Sea Pines Circle to Cordillo Parkway section is efficient
• Cordillo Parkway to Coligny Circle should prioritize non-motorized travel
• High volume of bike and pedestrian crossings introduces significant conflict
points
• Congestion at Lagoon Road intersection
The presentation continued with a review of existing conditions, an assessment of
pathways and crossings, drive access and connectivity, roadway layout, and options for
consideration
Council members held discussion, asked questions and made comments regarding: the
need for an on-street bike lane; the need to address and pursue multimodal forms of
transportation and the need to implement; a concern of traffic increase going west from
Coligny to Sea Pines Circle; consideration of an opportunity to consider using some of
the median to increase the roadway; confirmation there is room for adjustment on Pope
Avenue due to width; a suggestion the bike lane be incorporated within the pathway and
separating bikes from walkers on the pathway; concern that the casual biker will utilize
the on-road bike lane and a concern for safety issues; the need to consider a request
for a 25mph speed limit; a suggestion that the on street bike land should be more than 7
feet wide; the need to consider the on street bike lane for e-bikes; the need to consider
the commercial businesses in the area when making changes; a suggestion to
concentrate on improvements to crosswalks and pedestrian access; the need to keep
the small town feel; a suggestion for an all stop at the Lagoon Road intersection to allow
pedestrian movement all at the same time; and a suggestion for lighting in the area.
North and South Forest Beach Drive
What was heard:
• Unsignalized pedestrian crossings
• Wide crossing distance on South Forest Beach Drive
• Lack of beach-side pathway
• High volume bike and pedestrian crossings
• Bike and pedestrian conflict points
The presentation continued with a review of existing conditions, assessment of
pathways and crossings, roadway layout, and options for consideration.
Council members held discussion, asked questions and made comments regarding: an
Page 23 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/22/2024 Page 8 of 8
observation the north Forest Beach is a pure beach environment; an expression of
concern for safety; clarification of the on-street bike lanes; the need to discuss the
drainage issues at the back gate of Sea Pines; clarification of the proposed bike paths
on the beach side of the road; concern for tree removal if the bike paths are widened;
the need to create a beautiful roadway in the area making it more of a parkway; the
need to maintain the aesthetic, ambiance and character of who we are; support for the
cross system at North Forest Beach; support for lighting in the area; and a suggestion of
some type of median landscaping on the roads.
Mayor Perry asked if anyone signed up for public comment. Those that signed up for
public comment and their comments are listed below:
Frank Babel addressed Council thanking Town Council and Staff for all the work done
for the local bike businesses and riders. He made comments regarding safety on North
Forest and South Forest Beach, Coligny, Pope Avenue.
Due to a prior commitment, Mr. Brown had to leave the meeting at 5:28 p.m.
Deborah Urato addressed Council inquired if there would be resident input before
decisions are made. She added that the bike path needs to be extended to go past Ibis
Street. She pointed out the following issues: the light at Lagoon Road needs checked
for safety; bike stop signs are confusing; the HAWK signal at South Forest Beach Drive
needs audio to assist in knowing when to cross and stop; inquiry as to the longest wait
time to enter Sea Pines Circle; a request to increase the speed limit beyond Cordillo to
Sea Pines Circle from 35mph to 36 mph for the purpose of eliminating golf carts; and a
comment that Pope Avenue is going to become parking central if Wil Wings and the
Aunt Chiladas sites are turned into parking lots.
Karl Braden signed up to speak but was not present when called on.
Leslie Ford addressed Council regarding Cedar Woods regarding assistance with
drainage and with a path forward in obtaining a drainage agreement with the Town.
Adjournment
The meeting was adjourned at 5:36 p.m.
Approved:
Kimberly Gammon, Town Clerk
Alan R. Perry, Mayor
The recording of this Meeting can be found on the Town’s website at
www.hiltonheadislandsc.gov
Page 24 of 218
Town of Hilton Head Island Town Council Workshop
Meeting Minutes
10/30/2024 Page 1 of 12
Town of Hilton Head Island
TOWN COUNCIL WORKSHOP MEETING
Wednesday, October 30, 2024, 9:00 AM
Minutes
Call to Order
Mayor Perry called the workshop to order at 9:00 a.m.
Council Members present: Alan Perry, Mayor, David Ames, Ward 3, Mayor Pro-
Tempore; Alex Brown, Ward 1; Patsy Brison, Ward 2; Tammy Becker, Ward 4; Steve
Alfred, Ward 5; Glenn Stanford, Ward 6
Also present: Marc Orlando, Town Manager; Curtis Coltrane, Town Attorney; Kimberly
Gammon, Town Clerk
Chris Creed, Representative from Foth | Olsen
Adoption of the Agenda
Mr. Ames moved to approve. Mr. Alfred seconded. Motion carried (7-0).
Beach Renourishment Update - Shawn Colin, Assistant Town Manager
Shawn Colin conducted a presentation regarding the project with the following
information
PROJECT OVERVIEW::
•Hilton Head Island’s Beach has been renourished several times, beginning in
the 1990’s. Major renourishment projects were completed in 1990, 1997, 2006,
and 2016
•The proposed project will include:
•Placement of approximately 2.2 million cubic yards of sand, and Installation of
six rip-rap breakwaters on the Port Royal Sound shoreline at Pine Island
•The sand will be sourced from up to four offshore borrow areas located roughly
8 miles offshore
•The project is being implemented per the Town’s Beach Management Plan with
scheduled renourishment every 8 to 10 years
•The estimated project cost is $42 million
•Disruptions at individual properties generally last one week or less as the
moving operation progresses
•Once the operation is up and running, the project will advance along the beach
at a rate of 200 to 300 feet/day
Page 25 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 2 of 12
•The project schedule was developed to avoid significant impacts to nesting
turtles and migratory shore birds, including piping plovers and red knots
•Construction windows are set by US Fish and Wildlife Service
PROJECT BACKGROUND
Mr. Colin provided the project/activity history from 1990 through 2017.
PROJET STATUS AND SCHEDULE
US Fish & Wildlife Service (USFWS) Biological Opinion (BO)
•Issued on August 8, 2024
•Included in State Permit Terms and Conditions
Permit is currently being reviewed by the State and USACE
Project Schedule
•Preconstruction
•Anticipated permit issue date: Dec 31, 2024
•Bid Phase: Jan – Mar 2025
•Contract Awards: April 1, 2025
Construction (3 Phases)
•Phase 1 (Renourishment): June 2025 to Oct 2025
•Sand placement on the Island’s north end
•Phase 2 (Renourishment): Sept 2025 to May 2026
•Sand placement on south beach and central island
•Phase 3 (Breakwater Structures): To Be Determined
•Rock breakwater structures at Pine Island
PROJECT SCOPE
Permit 1
•South Beach: place 750,000 cubic yards of sand
•Central Atlantic: place 700,000 cubic yards of sand
•The Heel/Port Royal: place 500,000 cubic yards of sand
•Fish Haul: place 50,000 cubic yards of sand
Permit 2
•Pine Island: place 200,000 cubic yards of sand and install six rock breakwaters to
mitigate against sand accretion
Adriana Burnett and John McGowan conducted a presentation regarding the
information below:
PROJECT FUNDING
•Estimated Project Cost - $42.0 million
•FY 2025 (CIP) Budget Preservation Fee) - $16.5 million
•FY 2026 Funding - $25.5 million (Source of Funding to be determined)
Page 26 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 3 of 12
FUNDING OPTIONS
•Beach Preservation Fund Balance, reducing fund balance to $13 million +/-
•Issue Debt for ± $42.5 million; paid for with future Beach Preservation Fees
•Beach Preservation Fund Balance + Debt Issuance.
Ms. Burnett reviewed the remaining balances on the 2017 Beach Preservation Fee
Bonds – which were originally $30.1 million.
PROJECTS FY2025 & FY2026 Cash Flows
Scenario 1 Scenario 2 Scenario 3
All Cash Cash/Debt
Mix
All Debt
FY2025
Approximate Cash Balance as of June 30,
2024
$39,000,000 $39,000,000 $39,000,000
Expected Revenues FY25 $13,800,000 $13,800,000 $13,800,000
Budgeted Non-Beach Renourishment CIP
& Operating Expense FY25
$ (6,483,000) $ (6,483,000) $(6,483,000)
Budgeted Beach Renourishment CIP
FY25
$(16,500,000) $
(16,500,000)
$(16,500,000)
Remaining FY25 Series 2017 Debt
Service Payment (payable 2/1/25)
$(274,375) $ (274,375) $(274,375)
Proceeds from potential May 2025 Bond
Issue to pay for Capital Projects
$ - $ 26,000,000 $42,500,000
Projected Balance as of June 30, 2025 $29,542,625 $55,542,625 $72,042,625
FY2026
Expected Revenues FY26 $13,800,000 $13,800,000 $13,800,000
Page 27 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 4 of 12
FEMA Anticipated Past Storms
Reimbursements (80% of Expected)
$7,000,000 $7,000,000 $7,000,000
Budgeted Non-Beach Renourishment CIP
& Operating Expense FY25
$(6,483,000) $(6,483,000) $(6,483,000)
Remaining FY26 Series 2017 Debt
Service Payments (payable 8/1/25 &
2/1/26)
$(3,941,750) $(3,941,750) $(3,941,750)
Budgeted Beach Renourishment CIP
FY26
$
(26,000,000)
$
(26,000,000)
$(26,000,000)
Projected Balance as of June 30, 2026 $13,917,875 $39,917,875 $56,417.875
New Bond Debt Service
Communications Plan
Plan Goals
•Create widespread awareness and engagement related to the project
•Share timely information about the projects prior to and throughout each
phase
Target audiences include
•Island residents and visitors
•The Chamber of Commerce and business owners
•HOAs and property management firms
•Partner groups (Shore Beach Services, Island Rec, and others)
•School Groups
•Environmental Groups
•Media
Outreach will be managed by the Communications Team
•Social Media, Web postings, News releases
•Interactive, real-time mapping during implementation
Council members held discussion, asked questions and made comments regarding:
an expression of concern over a decline of revenues during renourishment and was
that factored in to the project; comment that the all debt option gives a chance to build
funds; the need for cash on hand to deal with the unexpected; clarification the
operation will be 24 hours per day at each site; an expression of appreciation for
communications to the public; inquiry into photos regarding rip-rap structures to enable
the community to understand what they look like; concerns for the communities in the
area of widening the channel at the bend and the need to point out the location to the
public; inquiry into other debt possibilities that are being reviewed; the need for more
detail on the interest rate on current debt compared to forecasted interest rate on
combined debt; the importance to note these are revenue bonds for specific revenue
as opposed to general obligation bonds; inquiry into the process in South Carolina for
Page 28 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 5 of 12
the issuance of revenue bonds; the need for information regarding debt service and
what would be the debt service for all current financing versus adding cash debt mix or
all debt mix and then doing refunding and combining the debt service versus not
combining and then comparing the numbers; inquiry as to notification of the project to
all beach front property owners and businesses; confirmation that the Chamber and
Property Owners Associations have been notified; confirmation notices will be sent via
USPS as soon as the permit has been issued; a request for additional information on
groins by Pine Island from an environmental and design standpoint; emphasis on the
importance of communication; the need for additional information regarding the
widening of the channel; the need for pros and cons of the 1 st and 2nd options; concern
that Tower Beach is eroded at this time and an inquiry as to the time frame for
addressing; confirmation an assessment was done and an emergency permit for
Tower Beach could not be permitted any faster than this project so it will be done
within the project time frame; confirmation that the tides and sand movement are
tracked with an annual monitoring program; the need to be aware of the interest rate
when borrowing funds; confirmation the sand will be placed before the rip-rap
structures will be placed to assist in access to the area; inquiry as to the Finance
Department recommendations and the need for further analysis; inquiry into safety
measure be taken for the rip-rap structures; inquiry into the debt rating affect; the need
to protect the Town financially for ratings and future borrowing; inquiry as to whether
the Beach Renourishment Fund requires a minimum amount in reserve; a request to
see a rendition of the rip-rap and how it modifies the area; acknowledgement that sand
is acquired through in-state waters which keeps costs down; confirmation that sand
sources are monitored annually and we are fortunate the sand in those areas builds
back up; inquiry as to why such a large increase in cost and confirmation it is due to
limited competition, a demand from the Federal side and in increase in cost for
mobilization; and confirmation future beach renourishments will be projected on an 8-
10 year basis.
Chris Creed provided answers to questions from Council regarding the beach
renourishment and the availability of sources. The Town is fortunate in that the sand
sources were in close proximity, so it keeps the cost down. The Town is fortunate that
the sand has filled in at the sources and the site can be used again. The sources are
monitored to determine the effects as we keep using them. He added that the sources
are located in State waters which keeps the cost down.
Mayor Perry stated he recently joined the Board of Directors for South Carolina Beach
Advocates which consists of Mayors and Town Administrators from the South Carolina
beach communities. They will be meeting in November and January in person to
discuss ways to work with the State for funding opportunities and to create an
understanding of the value of beaches for the economic impact of the State. He stated
it will be a push for the State to create funding for beach renourishment.
Resilience Plan Status Update - Shawn Colin, Assistant Town Manager
Shawn Colin provided a presentation and below is an overview:
BACKGROUND
Page 29 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 6 of 12
•Priority initiative in the Town of Hilton Head Island 2023-25 Strategic Action
Plan to identify Strengths, Weaknesses, Opportunities & Threats (SWOT) of
Hilton Head Island Resiliency and Establish an Island Resiliency Plan
•Town Council approved a Resolution June 6, 2023, supporting the proposed
approach and scope of services outline to complete the SWOT assessment
•Staff procured Dewberry, an expert consultant firm in the field of resiliency
planning, to conduct this assessment
SCOPE OF WORK APPROVED BY TOWN COUNCIL
Collect and compile information and conduct an analysis of the strengths, weaknesses,
opportunities, and threats (SWOT) that the Town possesses and faces with respect to
changing conditions
•Compilation and assessment of existing relative data and programs • Sea Level
Rise forecast analysis and selection of design forecast
•Public outreach and solicitation of stakeholder input
•Public policy and regulation assessment and identify those for change •
Recommendations related to floodplain management and future development
•Storm Drainage System assessment (tidal backflow prevention at tidal culverts
and outfalls, pump stations, hydraulic capacity, design standards)
•Beach Renourishment program (including sustainability analysis)
•Flood Inundation Mapping
•SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis
Resilience Planning Project Overview
•Step 1: Understand the threats and hazards posed to assets
•Step 2: Identify vulnerable assets and public policy and evaluate potential
impacts
Climate Change Projections
Sea-Level Rise and Flooding Risk
Storm Surge and Hurricanes
Environmental Degradation and Erosion • Infrastructure Vulnerabilities
(Transportation, Utilities)
Social and Economic Vulnerabilities (Public Health, Housing, Businesses)
Public policy assessment
•Step 3: SWOT findings , including GIS mapping and geodatabase to drive
decision-making on future actions for planning, policy, and engineering programs
presented to Town Council
•Step 4: Additional Community Engagement to present SWOT findings and
receive input
•Step 5: Town Council Prioritizes actions for Resilience Planning
•Step 6: Identify and evaluate mitigation, adaptation, and recovery actions for
built, social and natural systems
•Step 7: Draft Plan for Town Council consideration for built, social and natural
systems
Page 30 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 7 of 12
RESILIANCE PLAN CONTENTS
1. Executive Summary
a. Overview of the Resilience Plan
b. Key Goals and Objectives
c. Summary of Challenges and Opportunities
d. Action Plan Highlights
2. Introduction
a. Purpose of the Plan
b. Background on Hilton Head Island’s Resilience Efforts
c. Stakeholder Involvement d. Guiding Principles and Vision
3. Risk and Vulnerability Assessment
a. Climate Change Projections
b. Sea-Level Rise and Flooding Risk
c. Storm Surge and Hurricanes
d. Environmental Degradation and Erosion
e. Infrastructure Vulnerabilities (Transportation, Utilities)
f. Social and Economic Vulnerabilities (Public Health, Housing,
Businesses)
4. Resilience Goals and Priorities
a. Environmental Protection and Sustainability
b. Infrastructure Strengthening and Adaptation
c. Public Safety and Emergency Preparedness
d. Community Well-being and Social Resilience
e. Economic Resilience
5. Climate and Environmental Strategies
a. Flood Mitigation Measures
b. Shoreline Protection and Beach Renourishment
c. Wetland Restoration and Conservation
d. Water Resource Management
e. Tree Canopy and Greenspace Protection
f. Integrated Pest Management (IPM) Policy
6. Infrastructure and Community Planning
a. Transportation Resilience (Roadways, Public Transport)
b. Utility Resilience (Stormwater, Water/Sewer, Energy, Solid Waste and
Recycling)
c. Growth Management and Zoning
d. Public Facilities and Critical Infrastructure Adaptation
e. Future-Proofing New Development
7. Public Safety and Emergency Preparedness
a. Hurricane Preparedness and Response
b. Evacuation Routes and Sheltering Plans
c. Community Warning Systems and Communications Strategy
Page 31 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 8 of 12
d. Lifeguard and Public Safety Programs on Beaches
e. Medical and Health Services for Disaster Scenarios
8. Community and Economic Resilience
a. Housing Resilience
b. Small Business and Tourism Support Strategies
c. Workforce Retention Programs
d. Social Services Support
9. Governance and Partnerships
a. Coordination with County, State, and Federal Agencies
b. Public-Private Partnerships
c. Community Engagement and Public Education Programs
d. Intergovernmental Collaboration and Policy Alignment
10. Infrastructure and Community Planning
a. Transportation Resilience (Roadways, Public Transport)
b. Utility Resilience (Stormwater, Water/Sewer, Energy, Solid Waste and
Recycling)
c. Growth Management and Zoning
d. Public Facilities and Critical Infrastructure Adaptation
e. Future-Proofing New Development
11. Public Safety and Emergency Preparedness
a. Hurricane Preparedness and Response
b. Evacuation Routes and Sheltering Plans
c. Community Warning Systems and Communications Strategy
d. Lifeguard and Public Safety Programs on Beaches
e. Medical and Health Services for Disaster Scenarios
12. Community and Economic Resilience
a. Housing Resilience
b. Small Business and Tourism Support Strategies
c. Workforce Retention Programs
d. Social Services Support
Council members held discussion, asked questions and made comments regarding:
concern with the timeline and being able to meet the deadlines; inquiry into how the
table of contents compares to State and County resiliency plans; the need to ensure
the water supply is addressed and protected; inquiry as to how vulnerable
communities are being addressed; an observation the resilience definition needs to
include business and economics and communicate with all concerned; clarification the
need for short-term remedies for obvious projects needed; inquiry regarding tide
monitoring activities; inquiry into rise in sea level in the past 40 years; a suggestion to
include effects of new development due to upcoming LMO re-write; the need to include
impervious surfaces in the study; confirmation the Town coordinates with a weather
service out of Charleston for forecasting; the need to coordinate efforts with the
Planned Unit Developments and their resiliency plans; the need to include
infrastructure of wifi and data; a suggestion to coordinate with the Public Service
Page 32 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 9 of 12
Districts; a request to address the need for all residents to have sewer connections;
and an inquiry as to what is needed to expedite the project.
Mr. Orlando stated his goal was to leave the workshop with staff having full confidence
in the direction they are headed. He stated the State of South Carolia office of
Resilience is responsible for developing and implementing a strategic statewide
resilience and risk reduction plan. He stated the State plan addresses flooding. After
conducting the SWOT analysis, the Town needs to align programs including Public
Service Districts, hospitals, and housing. He explained the table of contents
references what they are hearing about resilience plans throughout the country.
Stormwater Utility Update - Jeff Netzinger, Engineering and Projects Director
Shawn Colin provided a presentation regarding the update with the following
information:
The current level of staffing (7 full time employees), the allocation of staff resources
and how they are distributed.
Staff time allocation distributed over 12 significant activity categories consisting of:
Utility Management; LMO Plan Review; NPDES Permit Compliance; Regulatory
Inspections; Service Request Data Management; Infrastructure Asset Management;
Inventory & Modeling Program; Water Quality Programs; Capital Improvement
Program; Pump Station Maintenance Program; Routine Maintenance Programs and
Corrective Maintenance Program.
Jeff Netzinger continued with the presentation with the information below:
STORMWATER UTILITY REVENUE
•The Utility was established in 2001 per an IGA with Beaufort County.
•A stormwater fee is included on annual property tax bills. o Fees are
calculated based on three components:
•Administrative Fee (flat rate per account)
•Impervious Area (based on total measured in square feet)
•Gross Area (measured in acres)
•Fees are based on a 4,906 ft2 Single-family Unit (SFU).
•Town Council elected to increased the base SFU fee rate from $108.70 to
$150.00 for a Single-family unit in 2017.
•Beaufort County collects the fees and transfers all funds to the Town, less
an administrative fee.
•The FY 2025 administrative fee is $3.90 per account based on 35,865
accounts, totaling $139,873.
•Total Stormwater Fee revenue was $5,275,035 in FY 2024
Mr. Netzinger continued with a detailed review of the expenses (FY2025 Budget
Allocation; Corrective Maintenance Program; Stormwater System Maintenance –
Disparities in Extent of Service; Corrective Maintenance Program – Drainage
Agreements; and the Corrective Maintenance Program Ranking and Project
Prioritization.
Page 33 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 10 of 12
SERVICE REQUEST EVALUATION
•All requests received are evaluated by staff if the request is determined to
qualify for Town Service
•Staff uses a customized evaluation tool (developed in 2018) to complete a
Risk Assessment and to apply Assessment Modifiers for each request.
•The Risk Assessment evaluates a variety of deficiency components:
•Inundation and Flooding Considerations as it relates to:
Roadway/Pathway Inundation and Flooding Impacts
Structure Inundation and Flooding Impacts
Amenities Inundation and Flooding Impacts
•Integrity and Safety Considerations as it relates to:
Roadway/Pathway Integrity and Safety Impacts
Structure Integrity and Safety Impacts
Amenities Integrity and Safety Impacts
•Drainage System Integrity Considerations as it relates to:
Conveyance Reduction Impacts
Drainage System Integrity Impacts
Drainage System Maintenance Impacts
•Assessment Modifiers are applied in several categories, including:
Ownership (applies a 2-point increase if Town-owned)
Multiple Unique requests (high level of public concern)
Town Leadership Directive
•Evaluation Scores are based on a 20-point scale
Mr. Netzinger reviewed the annual SWU and CIP Budget Development for FY2025.
CAPITAL IMRPOVEMENT PROGRAM
Will be developed based on a 5-year program plan
CORRECTIVE MAINTENANCE PROGRAM
•As of September 26, there were 136 open, qualifying corrective
maintenance projects
•The list of qualifying projects is updated dynamically throughout the year
as new requests come in and others are completed
•Tropical Storm Debby generated 72 new service requests, 30 of which are
still being evaluated by staff (as of 10/25)
•The FY 2025 Corrective Maintenance Program budget includes twenty-
one (21) projects (5 public and 16 PUD/POA)
•Four (4) high-priority projects were added during the first quarter of FY
2025 (3 public and 1 PUD/POA)
•Total project budgets are summarized below:
•FY25 Budgeted Projects (≥10) 25 $1,912,000
•Non-budgeted Projects (<10) 111 $1,593,000
ANNUAL SWU & BUDGET DEVELOPMENT
Page 34 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 11 of 12
•The Corrective Maintenance Program budget is determined based on
several factors, including:
•Available funding
•Staff capacity to implement projects
•Contractor capacity to complete projects
•The number of open qualifying requests is increasing
•The increase is related to:
•Aging systems experiencing increasing rates of failure (metal pipe and
perforated pipe are examples) MORE REQUESTS
•Increasing extent of service as the Town adds new drainage agreement
partners * MORE REQUESTS
•Staff capacity to implement projects remains flat
•Contractor capacity is limited on Hilton Head Island; many entities
compete to utilize the same pool of contractors with the necessary
expertise, skilled workers, and equipment
STORMWATER UTILITY –PROGRAM CHALLENGES/OPPORTUNITY
•Extent of Service
•Will continue to increase as new Drainage Agreement Partners are
added
•Will increase as new drainage easements are acquired
•Level of Service
•Will increasing as routine maintenance programs expand to provide
improved and more consistent service
•Will increase to allow for proactive condition assessment of existing
infrastructure
•Project Delivery Limitations for CIP and Corrective Maintenance Programs
•Staff Capacity
•Funding Capacity
•Contractor Availability
•Emergent Needs
•Aging infrastructure continues to experience failure at higher rates
requiring repair, rehabilitation, or replacement
•Resilience improvements will be necessary, informed by the
Resilience Study followed by an Island-wide Stormwater Master
Plan
•Opportunity for Consideration
•Utilize fund balance in FY26 to accommodate Drainage Agreement
Partner reimbursement requests to address lower priority projects
Council members held discussion, asked questions and made comments regarding:
inquiry into capability to accelerate CIP investments regarding staffing, contractors and
capabilities; inquiry as to the goal for the Town to have the greatest amount of capability
to solve drainage problems; acknowledgment this ties in with the resiliency program;
concern over the reimbursement program for Property Owner Associations; the need to
Page 35 of 218
Town of Hilton Head Island Town Council
Workshop Meeting Minutes
10/30/2024 Page 12 of 12
move in the direction of solving problems in an accelerated manor; inquiry into whether
we’re doing enough and spending enough for the program; the need for data and
information to make policy changes; the need for a long-term plan; the need to review
fees and adjust to meet needs; inquiry as to dollars collected from the stormwater utility
fees and if they come back to Hilton Head Island and where the funds are directed;
concern for areas not participating even though residents pay the fee; a suggestion this
becomes a priority with the new Council; concern for the Bay Pines area and a
suggestion to inquire about Beaufort County providing funds for us to assist; the need to
give serious consideration to increase funding for the program; the need for information
to go out to residents regarding the program and how it works; the need to address this
subject at the Strategic Planning Workshop; a challenge for staff to examine funding
without raising rates for property owners; a need to look at expanding staff; and the
need to rank critical areas that are not part of the drainage agreements and compose a
list, along with cost analysis and sources of funding.
Public Comment
Melinda Tunner addressed Council stating there is enough money to pay for beach
renourishment and all other beach related expenses and explained how she came to
that conclusion. She recommended that Council look at it in further years until the bond
is paid off. She questioned what problem they are trying to solve by adding more debt
on top of the debt incurred for beach renourishment. Ms. Tunner inquired as to the rate
of the 2017 bond and if the money invested is making more than the rate there is no
reason to pay it off early. She stated the need for additional information before the
decision is made.
Adjournment
The workshop adjourned at 11:58 a.m.
Approved:
Kimberly Gammon, Town Clerk
_______________________________
Alan R. Perry, Mayor
The recording of this Meeting can be found on the
Town’s website at www.hiltonheadislandsc.gov
Page 36 of 218
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
TOWN COUNCIL
TO: Town Council Members
FROM: Jeff Netzinger, Director of Engineering and Projects
VIA: Shawn Colin, Assistant Town Manager – Engineering & CIP
Curtis Coltrane, Town Attorney
CC: Marc Orlando, Town Manager
Adriana Burnett, Finance Director
DATE: November 12, 2024
SUBJECT: Consideration of a Resolution Authorizing the Execution of
Standardized Stormwater Agreements for:
i. Broad Creek Landing
ii. Paddocks on Jarvis Creek
iii. Ribaut Island
iv. Victoria Square
RECOMMENDATION:
The Finance and Administrative Committee (the “Committee”) is recommending that the
Town Council consider the adoption of a Resolution ( Attachment 1 ) authorizing the
execution of standardized drainage agreements and access, drainage, and maintenance
easements with the following four (4) requesting property owners’ and homeowners’
associations:
• Broad Creek Landing Horizontal Property Regime, Inc.
• Paddocks on Jarvis Creek Property Owners’ Association, Inc
• Ribaut Island Property Owners Association, Inc
• Victoria Square Property Owners’ Association, Inc.
BACKGROUND:
After the creation of the Storm Water Utility in 2001, the Town offered to accept
maintenance responsibility for storm water systems located within private Planned Unit
Developments (PUDs). Between 2007 and 2012, the Town executed and delivered
drainage agreements with eleven (11) PUDs including Shipyard, Wexford, Long Cove
Club, Sea Pines, Palmetto Dunes, Leamington, Shelter Cove, Port Royal Plantation,
Indigo Run, Hilton Head Plantation, and Palmetto Hall.
On September 21, 2021, Town Council authorized executing drainage agreements with
six (6) additional communities, including Bermuda Pointe, Jarvis Creek Club, Seagrass
Landing, Spanish Wells, Wells East, and Yacht Cove.
Page 37 of 218
Page 2 of 2
On November 4, 2020, Town Council approved standardized terms and conditions for
current and future drainage agreements. All eleven (11) original agreements were
recently updated, using the standard terms and conditions, as authorized by Town
Council on July 19, 2022.
On June 6, 2023, Town Council authorized executing drainage agreements with five (5)
additional communities, including Ashton Cove, Beach City Place, Carolina Isles,
Chinaberry Ridge, and Peregrine Pointe.
Staff maintains an exhibit depicting the location and boundaries of current and
prospective drainage agreement partners (Attachment 2).
At its September 24, 2024, meeting, the Committee voted 4-0 recommending that this
resolution be brought before Town Council for consideration.
SUMMARY:
The Town currently has similar drainage agreements and easements with twenty-two (22)
PUDs, property owners’ associations, and homeowners’ associations . These potential
new partners have requested service via drainage agreements with the Town. All four
(4) of the requesting entities meet the qualifications for acceptance of new systems,
including the presence of shared, common road rights -of-way within their respective
private communities. All new agreements use the standardized terms and conditions
approved by Town Council on November 4, 202 0. Drainage Agreements and Access,
Drainage and Maintenance Easements were prepared by the Town and signed by
authorized owners’ association board members for each of the four (4) entities
(Attachment 3).
ATTACHMENTS:
1. Draft Town Resolution (revised 10/24/24)
2. Prospective Agreement Partners Exhibit
3. Drainage Agreements and Access, Drainage and Maintenance Easements
signed by authorized owners’ association board members for each of four (4)
entities currently requesting agreements.
Page 38 of 218
Revised on 09-24-2024
1
RESOLUTION 2024-______
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF HILTON HEAD
ISLAND, SOUTH CAROLINA, AUTHORIZING THE EXECUTION AND DELIVERY
OF D RAINAGE AGREEMENTS AND ACCESS , DRAINAGE , AND MAINTENANCE
EASEMENTS WITH BROAD CREEK LANDING HORIZONTAL PROPERTY
REGIME, INC. ; PADDOCKS ON JARVIS CREEK PROPERTY OWNERS’
ASSOCIATION, INC.; RIBAUT ISLAND PROPERTY OWNERS ASSOCIATION, INC. ;
AND VICTORIA SQUARE PROPERTY OWNERS’ ASSOCIATION, INC.
WHEREAS, The Town of Hilton Head Island, South Carolina, has negotiated Drainage
Agreements and Access, Drainage, and Maintenance Easements related to the management of
storm and surface drainage with property owners’ and homeowners’ associations on Hilton Head
Island, known as Broad Creek Landing Horizontal Property Regime, Inc.; Paddocks on J arvis
Creek Property Owners’ Association, inc.; Ribaut Island Property Owners Association, Inc.; and
Victoria Square Property Owners’ Association, Inc.; and,
WHEREAS, Beaufort County, South Carolina adopted Ordinance 99- 101 et seq., as
amended, creating a Storm Water Utility with the power to impose Storm Water Service Fees on
all residents of Beaufort County, South Carolina and which also provides that fees collected from
within the municipal limits of the Town of Hilton Head Island, South Carolina (“Town”) are
returned to the Town to be used for the purposes set forth in the Ordinance including the
construction and maintenance of planned and existing infrastructure which collects and disposes
of surface and storm water within the municipal limits of the Town; and,
WHEREAS, the Town Council of the Town of Hilton Head Island, South Carolina has
determined that it is in the best interests of the Town of Hilton Head Island, South Carolina, to
authorize the execution and delivery of the Agreements and Easements.
Page 39 of 218
Revised on 09-24-2024
2
NOW, THEREFORE, BE IT RESOLVED AND IT HEAREBY IS RESOLVED BY
THE TOWN COUNCIL OF THE TOWN OF HILTON HEAD ISLAND, SOUTH
CAROLINA:
1. The Mayor and Town Manager are hereby authorized to execute and deliver Drainage
Agreements and Access, Drainage, and Maintenance Easement s between The Town
of Hilton Head Island, South Carolina, and B road Creek Landing Horizontal Property
Regime, Inc.; Paddocks on Jarvis Creek Property Owners’ Association, inc.; R ibaut
Island Property Owners Association, Inc.; and V ictoria Square Property Owners’
Association, Inc., copies of which are attached hereto as Exhibits “A-D.”
2. The Town Manager is hereby authorized to take all other and further actions as may
be necessary to comply with the obligations of The Town of Hilton Head Island,
South Carolina, in the Agreements.
MOVED, APPROVED, AND ADOPTED BY THE TOWN COUNCIL THIS _______ DAY
OF _____________________, 2024.
______________________________
Alan R. Perry, Mayor
ATTEST:
___________________________________
______________________, Town Clerk
APPROVED AS TO FORM:
___________________________________
Curtis L. Coltrane, Town Attorney
Introduced by Council Member: _____________________________
Page 40 of 218
Page 41 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 1 of 33
STATE OF SOUTH CAROLINA )
) DRAINAGE SYSTEM
COUNTY OF BEAUFORT ) MAINTENANCE AGREEMENT
This Drainage System Maintenance Agreement is made this _____ day of
________, 202__, by and between Broad Creek Landing Horizontal Property Regime,
Inc., a South Carolina nonprofit organization, and the Town of Hilton Head Island, South
Carolina, a body politic, having an address of One Town Center Court, Hilton Head Island,
South Carolina, 29928.
WITNESSETH
WHEREAS, Broad Creek Landing is a subdivision of land lying and being within
the Town of Hilton Head Island, Beaufort County, South Carolina (hereinafter the
“Development”); and,
WHEREAS, Broad Creek Landing Horizontal Property Regime, Inc. , is the owner
of improved and unimproved real property and easements within Broad Creek Landing ;
and,
WHEREAS, Beaufort County, South Carolina, has adopted Ordinance 99 -101, et
seq., as amended, creating a Storm Water Utility with the power to impose Storm Water
Utility Service Fees on all residents of Beaufort County, South Carolina, and which also
provides that Storm Water Utility Service Fees collected from property owners within the
Town of Hilton Head Island, South Carolina , are returned to it , less administrative fees,
to be used for the purposes set forth in Ordinance 99-101, et seq., as amended; and,
WHEREAS, the imposition and collection of Storm Water Utility Service Fees
results in a fund available for the construction and maintenance of existing and planned
Page 42 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 2 of 33
infrastructure for the collection and conveyance of storm water runoff within the Town of
Hilton Head Island, South Carolina, and,
WHEREAS, Broad Creek Landing Horizontal Property Regime, Inc. , desires for
the Town of Hilton Head Island, South Carolina, to utilize Storm Water Utility Service
Fees to undertake maintenance and improvement of the storm water drainage system in
Broad Creek Landing , to facilitate the conveyance of storm water runoff within and
through the Development; and,
WHEREAS, the Broad Creek Landing Horizontal Property Regime, Inc. , has
agreed to grant access, drainage, and maintenance easements to the T own, in order to
facilitate the maintenance and improvement of the qualifying storm water drainag e
system in Broad Creek Landing.
Now, therefore , know all men by these presents, that Broad Creek Landing
Horizontal Property Regime, Inc., and the Town of Head Island, South Carolina, for and
in consideration of the sum of One and n o/100 ($1.00) Dollar, each paid to the other at
and before the execution and delivery of this Agreement, the receipt and sufficiency
whereof is acknowledged, agree as follows:
1. Defined Terms: As used in this Agreement , the following terms as related to
this agreement shall mean:
a. Agreement: This “Drainage System Maintenance Agreement”.
b. Casualty: The destruction of all or any part of the Drainage S ystem
through a natural disaster.
c. Covenants: Any one or more of Covenants, Conditions, and
Restrictions for Broad Creek Landing Horizontal Property Regime,
Page 43 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 3 of 33
Inc. recorded in the Office of the Register of Deeds for Beaufort
County. South Carolina.
d. Development: Broad Creek Landing, a planned unit development or
subdivision lying and being on Hilton Head Island, Beaufort County,
South Carolina, which is shown and described on the map attached
as Exhibit “B” hereto.
e. Drainage System: The existing system of lagoons, ditches, canals,
pipes, culverts, catch basins, drains, manholes, junction boxes, weirs,
valves, gates, pumps, structures, related equipment, and related
infrastructure, in the Development lying within the Easement Areas
shown on the map attached hereto as Exhibit “A,” which facilitates
the collection, storage and conveyance of storm and surface water
runoff for public benefit through, within, and from the Development.
For purposes of this Agreement, the Drainage System shall not
include any bridges, docks, retaining walls, road or pathway asphalt,
road or building gutters, underdrains, sub-drains, structural
bulkheads, beaches, tidal banks, estuaries, or salt marshes , or
driveway pipes, unless the T own, in its sole discretion deems any
particular driveway pipe as critical to the function of the Drainage
System.
f. Emergency: A blockage, structural or mechanical failure, collapse
or other sudden catastrophic event affecting any part of the Drainage
System which prevents or substantially inhibits the flow of storm and
Page 44 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 4 of 33
surface water through all or any part of the Drainage System, or
which otherwise results in an imminent peril to life or property.
g. Permanent Structure: Any immovable structure, including, but not
limited to, buildings , sheds, pavilions, walls, masonry structures,
tennis courts, and swimming pools, including swimming pool decks.
h. Pollutant: A nything which causes or contributes to pollution.
Pollutants may include, but are not limited to: paints, varnishes, and
solvents; petroleum hydrocarbons; automotive fluids; cooking
grease; detergents (biodegradable or otherwise); degreasers;
cleaning chemicals; non-hazardous liquid and solid wastes and yard
wastes; sediment; refuse, rubbish, garbage, litter, or other discarded
or abandoned objects and accumulations, so that same may cause or
contribute to pollution; floatables; pesticides, her bicides, and
fertilizers; liquid and solid wastes; sewage, fecal coliform and
pathogens; dissolved and particulate metals; animal wastes; wastes
and residues that result from constructing a building or structure;
concrete and cement; and noxious or offensive matter of any kind.
i. Post-construction Structural Best Management Practice Facility: A
Post-construction Structural Best Management Practice Facility
(BMPF) is a facility designed and built to provide treatment of storm
water either through storage, filtration or infiltration (i.e. detention
basins, retention basins, rain gardens, bioretention cells, sand filters,
vegetated filter strips, water quality swales and infiltration trenches)
Page 45 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 5 of 33
as set forth in the latest editions of the Beaufort County Manual for
Storm Water Best Management and Design Practices, the South
Carolina DHEC Storm Water Management BMP Handbook, and the
Georgia Coastal Stormwater Supplement, which include descriptions
standards, and design guidelines for these facilities.
j. Project: Work, including repairs and improvements performed or
approved by the Town to correct a specific Qualifying Storm
Drainage System Deficiency.
k. Qualifying Drainage System Deficienc y: Anything that, in the
determination of the Town , prevents, impairs or impedes the
adequate conveyance or drainage of storm water runoff through the
Drainage System or the structural failure of a Drainage System
component. Qualifying Drainage System Deficiencies include, but
are not limited to, the following:
i. Lagoon bank erosion that has an appreciable adverse impact
on conveyance of storm water runoff through the Drainage
System or threatens the integrity of adjacent Drainage System
infrastructure or Permanent Structures;
ii. Presence of sediment and debris located in the Drainage
System that has an appreciable adverse impact on the
conveyance of storm water runoff through the Drainage
System or the functioning of the Drainage System;
Page 46 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 6 of 33
iii. Structural deficiencies associated with pipes and culverts,
including, but not limited to, joint failures, deterioration, root
intrusion, or collapse that has an appreciable adverse impact
on conveyance of storm water runoff through the Drainage
System or threatens the integrity of adjacent Drainage System
infrastructure or Permanent Structures;
iv. Structural deficiencies associated with inlets , manholes,
junction boxes , control structures and headwalls including ,
but not limited to, connection failure, deterioration,
mechanical failure, or collapse that has an appreciable
adverse impact on conveyance of storm water runoff through
the Drainage System , or that threatens the integrity of
adjacent infrastructure or Permanent Structures . Examples
of typical deficiencies include damaged grates, grout failures
at pipe connections, deterioration or failure of flap gates and
sluice gates, or failure of structure walls;
v. Sinkholes caused by Drainage System pipe or Drainage
System structure Deficiencies, but not those caused by the
actions of any third party, including utility providers;
vi. Drainage System conveyance or performance deficiencies due
to inadequate design capacity. Examples of t ypical
conveyance or performance deficiencies include undersized
pipes and insufficient weir capacities.
Page 47 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 7 of 33
Qualifying Drainage System Deficiencies do not include the
following:
i. The aesthetic appearance or appeal of any part of the Drainage
System, including but not limited to lagoons, banks of
lagoons, channel banks, landscaping, drains, catch basins,
canals, structures, bridges, bulkheads, pipes, culverts,
valves gates, debris that does not have an appreciable
adverse impact on the conveyance of storm and surface
water through the Drainage System , or other visible
components of the Drainage System;
ii. The introduction of pollution or pollutants into the Drainage
System from any source;
iii. Lagoon bank erosion that does not have an appreciable
adverse impact on conveyance of storm water runoff
through the Drainage System or threaten the integrity of
adjacent Drainage System infrastructure or Permanent
Structures;
iv. Tidal erosion or tidal flooding that does not have an
appreciable adverse impact on conveyance of storm water
runoff through the Drainage System or threaten the
integrity of Drainage System infrastructure;
v. Establishment of access to the Drainage System by the
Regime, including, but not limited to, grading, clearing of
Page 48 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 8 of 33
vegetation, removal of trees, or removal of other
obstructions or Permanent Structures in order to provide
physical access to the Drainage System;
vi. Drainage System damage or deficiencies caused by the actions
of others, including utilities and property owners (including,
but not limited to, bores or cuts into pipes or structures);
vii. Minor or nuisance flooding that do es not adversely affect
transportation infrastructure, Permanent Structures ,
hardscape amenities, or conveyance of storm water runoff
through the Drainage System , including golf course
flooding, isolated lawn and yard ponding, or standing water
in roadway shoulders and unimproved lots or land;
viii. Drainage System D eficiencies determined by the T own to be
caused or exacerbated by intentional acts causing tidal
backflow and saltwater intrusion into the Drainage System
through failure to operate control structures per the design
intent or the failure by the Regime to monitor and maintain
proper functioning of backflow prevention devices including
flaps, gates, sluice gates, check valves, or similar devices;
ix. Damage to, or failure of , Drainage System components
situated underneath or within five (5) feet of any Permanent
Structure that is not a part of the Drainage System, where
the Town determines that difficult access and/or liabilities
Page 49 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 9 of 33
exist, or within the zone of influence for the foundation of a
Permanent Structure;
x. The construction of a new drainage system or an addition to
an existing Drainage System, or the modification of an
existing Drainage System to accommodate drainage
requirements for new development within the
Development.
xi. Drainage System deficiencies determined by the Town to be
caused by or originating from unauthorized or non -
permitted modifications to the Drainage System by any
party other than the Town.
l. Regime: Broad Creek Landing Horizontal Property Regime, Inc. , a
South Carolina not -for-profit corporation with the full authority
under the Covenants to enter into this Agreement and to complete
all of the Regime’s obligations under it, and to execute and deliver
the Access, Drainage and Maintenance Easement attached hereto as
Exhibit “C.”
m. Storm Water Utility Service Fees: The fees collected by Beaufort
County, South Carolina, under the authority of Beaufort County
Ordinance 99-101, et seq., as amended, and which are remitted by
Beaufort County, South Carolina, to the T own; or any similar fee,
however denominated, imposed and collected by any subsequent or
Page 50 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 10 of 33
successor Storm Water Utility operated by The T own, under the
authority of Town Ordinance Number 2002-43.
n. Storm Water Utility Project Prioritization and Annual Budget
Process: The annual process by which t he Town of Hilton Head
Island, South Carolina, shall establish and maintain a prioritized list
of all known Qualifying Drainage System Deficiencies within the
Town limits determined to be eligible for service using Storm Water
Utility Service Fees. Prior to the beginning of each fiscal year, the
Town shall establish an annual Storm Water Utility budget which
defines all revenues and expenditures associated w ith the Storm
Water Utility Service Fees. This budget shall include those known
Projects to correct Qualifying Drainage System Deficiencies intended
to be completed within that fiscal year.
o. Town: The Town of Hilton Head Island, South Carolina.
2. Grant of Easements: Contemporaneously with the execution and delivery of
this Agreement, the Regime and the Town have entered into an “Access, Drainage
and Maintenance Easement” which grants the Town rights to access, operate,
utilize, maintain, and improve the Drainage System within the Development, with
said easement being in the form attached hereto as Exhibit “C”.
3. Maintenance, Inspection and Operation of Drainage System: Upon the
execution and delivery of this Agreement and the Access, Drainage and
Maintenance Easement:
Page 51 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 11 of 33
(a) the Town shall be responsible for the maintenance, repairs and
improvements necessary to correct any Qualifying Drainage System
Deficiency under the terms and conditions of this Agreement . T his
Agreement does not preclude the Regime from repairing, maintaining, or
improving any component of its Drainage System at its expense.
(b) The Regime shall be responsible for the following within the Development:
(i) Normal and emergency o peration of Drainage System control
structures, including gates, weirs and pumps, and for lowering water
levels in compliance with pre-storm preparation protocols
established by the Town.
(ii) Maintenance and replacement of weir boards , maintenance of
control structure access ways, decking and railings, and maintaining
control structure accessibility for inspection and operation by
controlling and/or removing vegetation as necessary.
(iii) Performing maintenance of work shelves along ditches and canals to
provide reasonable and adequate access for inspection,
maintenance, and repair.
(iv) Monitoring the condition of flap gates, sluice gates, check valves, and
similar devices intended to prevent the intrusion of tidal backflow
and brackish water into the Drainage System to ensure that they are
in proper working order and functioning as intended.
(v) Making repairs to roadway pavement, pathway pavement, curb and
gutter and related ancillary infrastructure or property damage
Page 52 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 12 of 33
attributed to a past or existing Qualifying Drainage System
Deficiency if the deficiency has been corrected by the T own via
trenchless technology methods (i.e. pipe lining) . This does not
obligate the Regime to repair or replace such infrastructure if the
repair is made using open cut excavations where removal of surface
infrastructure is necessary to complete the repair, in which case, the
repair of the ancillary infrastructure shall be considered to be a part
of the Town’s work to correct the deficiency.
(vi) Performing annual inspections of Post-construction Structural Best
Management Practice Facilities in order to comply with Stormwater
Management Plan obligations, including submittal of inspec tion
documentation to the Town in accordance with § 16-5-109 (H)(2),
Municipal Code to the Town of Hilton Head Island (1983).
(vii) Regulating the actions of utility providers and property owners, or
their assigns, to prevent and mitigate any damage they may cause to
the Drainage System.
4. Procedure for Town’s Maintenance of Drainage System: The Parties
acknowledge that the T own intends to provide for the maintenance and
improvement of the Drainage System and the repair of identifi ed Qualifying
Drainage System Deficiencies, other than those caused by an Emergency or
Casualty, through the development of its Storm Water Utility Project Prioritization
and Annual Budget Process. Other than in the case of an Emergency or Casualty,
Page 53 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 13 of 33
as described in Articles 7, 8 and 10 below, or work completed directly by the
Regime under Article 9, the Parties agree:
a. Identifying Qualifying Drainage System Deficiencies: The Regime
shall be responsible for i dentifying any Qualifying Drainage System
Deficiencies.
b. Schedule for Submission: The Regime shall submit a written
description of each known Qualifying Drainage System Deficiency to
the Town using the service request form provided by the T own,
describing the nature, location, and cause (if known) of each
Qualifying Drainage System Deficiency. The Regime may identify a
potential solution for the deficiency. In such case, the Regime shall
include a description of the solution and a preliminary estimate of
anticipated costs for the proposed solution . Qualifying Drainage
System Deficiencies that are reported to the T own, or which are
discovered by the T own, by the end of any calendar year will be
considered in the development of the Storm Water Utility Project
Prioritization and Annual Budget Process for the following fiscal
year.
c. Completion of Maintenance: The Town shall annually develop a
Storm Water Utility Project Prioritization and an Annual Budget that
will address identified Qualifying Drainage System Deficiencies as
follows:
Page 54 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 14 of 33
i. The Town shall determine the scope and extent of the
maintenance, repair or improvement that is necessary to
correct any Qualifying Drainage System Deficiencies, and the
means, methods and materials needed to accomplish the
same.
ii. The Town shall d etermine the priority and number of the
Projects and schedule the Projects to correct to correct the
Qualifying Drainage System Deficiencies for each fiscal year.
The determination of the scheduling and funding for the
correction of the Qualifying Drainage System Deficiencies
shall be made by the Town, taking into account the following:
1. The availability and amount of the Storm Water
Utility Service Fees fund balance, revenue from
bonds paid by Storm Water Utility Service Fees,
and Storm Water Utility Service Fees in any given
fiscal year;
2. Prioritization of a ll other Projects, or qualifying
requested improvements, repair and maintenance
that are to be funde d with Storm Water Utility
Service Fees; and
3. The annual cost required to operate the Storm
Water Utility, its programs and initiatives, and
debt service.
Page 55 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 15 of 33
iii. The T own will c omplete the Projects as determined by the
Town as a part of the Storm Water Utility Project
Prioritization and Annual Budget Process , unless
Emergencies or C asualties occur that alter the prioritization
and funding such that funds are insufficient to correct all
Qualifying Drainage System D eficiencies as intended within
the same fiscal year.
d. Scheduling of Projects: Other than in the case of an Emergency or
Casualty, the T own and the Regime shall mutually agree in writing
as to the scheduling of any Project to be performed under this
Agreement in the Development in advance of the commencement of
the Project.
e. Resident Notification: The Regime shall be solely responsible for the
notification of its owners and guests that may be affected by any
Project, or by work to address any Emergency or Casualty.
f. Legal Access to Private Property : The Regime shall be responsible
for obtaining all access rights, including access rights over and across
property in the Development that is not owned by the Regime, as may
be deemed necessary by the Town to complete any Project.
g. Access Needed to Complete Project: The Regime shall be responsible
for providing clear and adequate physical access to each Project site
at no cost to the Town . If clear, adequate physical access to the
Project site cannot be provided sufficient to complete the Project
Page 56 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 16 of 33
without the likelihood of damage to property, assets and amenities
by contractors and equipment , the repair and replacement of any
property, assets and amenities damaged as a result of the Project
shall be the responsibility of the Regime, at no additional cost to the
Town. Such property, assets and amenities shall include, but are not
limited to, landscaping, flowerbeds, ornamental shrubs and trees,
lawns, irrigation systems, boardwalks, cart paths, driveways, and
sidewalks. The d etermination of whether t he access is clear and
adequate, and whether there is a likelihood of damage shall be made
at the sole discretion of the Town, prior to the commencement of the
Project. The Regime has the right to withdraw the service request if
the magnitude of potential damage is not acceptable to the Regime.
If the service request is withdrawn, completing the Project shall be
the responsibility of the Regime.
h. No Guarantees Regarding Schedule: The Town cannot guarantee
that the amount of available Storm Water Utility Service Fees, the
number of Projects to be funded with Storm Water Utility Service
Fees in any given fiscal year, and whether Emergencies and
Casualties and weather-related general emergencies will not cause
delays in the correction of Qualifying Drainage System Deficiencies
within the D evelopment and elsewhere. The parties acknowledge
that the Town’s determinations with respect to the priority, funding
Page 57 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 17 of 33
and timing of any Project shall be made at the Town’s discretion and
shall be final.
5. Further Obligations of the Regime: The Regime agrees that during the term,
or any renewal term, of this Agreement, it shall take no action which damages the
Drainage System, allows damage to the Drainage System, or creates a D rainage
System Deficiency, including, but not limited to allowing salt water intrusion or
pollutants to enter the Drainage System and allowing utility providers, property
owners, or their assigns to impair the function of the Drainage System . To the
extent the Regime has a continuing obligation under the Covenants to repair and
maintain various improvements located within the Development including
lagoons and lagoon banks, ditch maintenance shelves, roads, pathways, utilities,
this Agreement is not intended to in any way restrict or limit the Regime’s
completion of its obligations.
6. Payments as Current Expense of Town: A ny payments to be made by the
Town hereunder shall be made from Storm Water Utility Service Fees as budgeted
for by the Town in any given fiscal year. The Town and the Regime intend that the
payment obligations of the T own shall constitute a current expense of the T own
and shall not in any way be construed to be a debt of the Town in contravention of
any applicable constitutional or statutory limitations concerning indebtedness of
the Town, nor shall anything contained herein constitute a pledge of general tax
revenues, funds, money or credit of the Town.
7. Emergency: The Parties agree that in the event of an Emergency, the following
procedure shall apply:
Page 58 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 18 of 33
a. Agreement Not Terminated : This Agreement shall remain in full
force and effect.
b. Responsibilities of the Regime: The Regime shall take such steps as
may be reasonably necessary to secure any area affected by the
Emergency. The Regime shall notify the Town as soon as is practical
after discovery of the Emergency. The Regime may complete any
repairs to the Drainage System needed to address the Emergency, as
provided for in Article 10, below.
c. Responsibilities of the Town: Upon receipt of notification of an
Emergency from the Regime, the Town shall determine the scope
and extent of the work that is necessary to repair or correct the
damage caused by the Emergency, and the means, methods and
materials needed to accomplish the same. The Town shall correct or
repair the damage caused by the Emergency as soon as practical,
taking into account the threat presented by the Emergency, the
existence of any other Emergency or Casualty , the cause of the
Emergency and/or the existence of any general emergency affecting
the Town and availability of funding . The T own may seek
reimbursement from third parties for any costs incurred by the Town
as a result of any Emergency found to have been caused by the
negligence of said third parties.
8. Casualty: The Parties agree that in the event of a Casualty, the following
procedure shall apply:
Page 59 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 19 of 33
a. Agreement Not Terminated : This Agreement shall remain in full
force and effect.
b. Design of Drainage System: The Town shall produce engineering
and design plans at its expense for the reconstruction of all or any
part of the Drainage System affected by the Casualty.
c. Approval of Plans: The engineering and design plans must be
approved by the Regime prior to any reconstruction of the Drainage
System. If the Regime does not approve the engineering and design
plans prepared by the T own, the Regime may reconstruct the
Drainage System at its own expense and shall not seek
reimbursement for the cost thereof from the Town.
d. Right of Entry and Access: If the engineering and design plans
approved by the Regime require work outside of easement limits
described in the Access, Drainage and Maintenance Easement , the
Regime shall provide temporary easements for access and
construction over any property it owns or controls and shall deliver
a valid temporary construction easement for access and construction
from the owners of property that the Regime does not own.
e. Amendment of Access, Drainage and Maintenance Easement : In
the event that the engineering and design plans approved by the
Regime, Include permanent improvements, or create access or other
needs that are in areas not included in the Access, Drainage and
Maintenance Easement, the Regime agrees that it will execute and
Page 60 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 20 of 33
deliver an amendment to the Access, Drainage and Maintenance
Easement to subject any such areas in the Access, Drainage and
Maintenance Easement.
f. Reconstruction of Drainage System: Following the approval of the
engineering and design plans and specifications by the Regime, the
Regime’s delivery of any needed temporary easements for access and
construction, the Town shall complete the reconstruction of the
Drainage System, or any part of it, as soon as is practical, taking into
account the threat presented by the cause of the Casualty, the
existence of any general emergency affecting the Town, the existence
of other Emergencies and Casualties and availability of funding.
Other than the expenses identified in subsection (b) of this Article 8,
the Town may seek reimbursement for any costs incurred by the
Town as a result of any Casualty from Storm Water Utility Service
Fees, bond, any government aid and assistance programs , or the
Regime, if the Regime is responsible for all or any part of the
Casualty.
9. Maintenance of Drainage System by the Regime: Nothing herein shall
prohibit the Regime from performing any Project in advance of the time that any
such Project is scheduled as a part of the Town’s Storm Water Utility Project
Prioritization and Annual Budget Process, if the Regime determines that it is in its
interest to do so. Other than in the case of an Emergency (addressed in Article 10,
below), or a Casualty (addressed in Article 8, above), the Regime shall be entitled
Page 61 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 21 of 33
to reimbursement, in an amount up to the amount budgeted by the Town for the
Project but not exceeding the actual cost to the Regime, from Storm Water Utility
Service Fees, in the fiscal year that such Project is scheduled to be done as a part
of Town’s Storm Water Utility Project Prioritization and Annual Budget Process ,
as follows;
a. The Regime shall submit its plans, quantities, and specifications for
any Project to the Town.
b. The Town shall grant its written approval to the Regime to complete
the Project unless it determines that:
i. The plan and work proposed by the Regime will not
correct the existing Qualifying Drainage System
Deficiency; or,
ii. The scope of the p roposed work exceeds what is
necessary to correct the existing Qualifying Drainage
System Deficiency,
c. Upon receipt of the Town ’s written a pproval, the Regime shall bid
the work in accordance with the T own’s Procurement Code, § 11- 1-
111, Municipal Code of The Town of Hilton Head Island, South
Carolina (1983), as the same may be amended from time to time.
d. Any changes in the approved scope of work for the Project resulting
in additional work or cost to the T own must be approved in writing
by the Town prior to commencement of any additional work.
Page 62 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 22 of 33
e. The Regime shall notify the T own at least seventy-two (72) hours
prior to the commencement of work on the Project and at any key
junctures of the work where the Town may need to inspect the work.
f. Upon completion of the Project, the Town shall inspect the Project
and provide the Regime written approval or rejection of the Project.
g. If the Project is approved by the Town , the Regime shall submit to
the Town its request for reimbursement , which shall include full
documentation of the bid and procurement of the work to complete
the Project , the contract for the work to complete the Project , the
construction plans, details and as -built surveys or drawings,
measurements, dated inspection reports, photographs of the work in
progress, documentation of the payments made by the Regime, any
required test reports and the Regime’s written certification that the
Project was completed in accordance with the approved plans and
specifications.
h. The Town shall thereafter budget funds for reimbursement to the
Regime from Storm Water Utility Service Fees in the fiscal year that
the Project would have otherwise been scheduled in the Town’s
Storm Water Utility Project Prioritization and Annual Budget
Process. The schedule for reimbursement shall depend upon the
Project ranking when compared to all other Projects as determined
in the Town’s Storm Water Utility Project Prioritization and Annual
Budget Process and may be moved forward into a future budget year
Page 63 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 23 of 33
as a result. The Regime acknowledges that the Town has no
obligation to reimburse the Regime for any Project in the fiscal year
following the Regime’s completion of the Project, or in any other
particular fiscal year.
10. Emergency Work by the Regime: If for any reason, the Town is unable to
repair or correct the damage caused by an Emergency in a time frame that is
acceptable to the Regime, the following shall apply:
a. The Regime shall consult with the Town to determine a cost-efficient
scope and extent of work necessary to repair or correct the damage
caused by the Emergency, and the means, methods and materials
needed to accomplish the same. The TOWN must approve in writing,
the scope and plans for the work and procurement of construction
services, prior to the commencement of work. The Regime is not
required to bid the work but if the Regime chooses to bid the work,
the Regime shall bid the work in accordance with th e Town’s
Procurement Code, § 11-1-111, Municipal Code of The Town of Hilton
Head Island, South Carolina (1983), as the same may be amended
from time to time.
b. The Regime shall complete the work that is necessary to repair or
correct the damage caused by the Emergency.
c. The Regime shall, whenever possible, notify the Town at least
seventy-two (72) hours prior to the commencement of work and at
Page 64 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 24 of 33
any key junctures of the work whereas the Town may need to inspect
the work.
d. Upon completion of the work that has been authorized and approved
by the T own, the Regime shall submit to the Town a request for
reimbursement, which shall include full documentation of the bid
and procurement documents for the work, the contract for the work,
construction plans, details and as -built surveys or drawings,
measurements, dated inspection reports , photographs of the work
done and documentation of the payments made, any required test
reports and the Regime’s written certification that the work was
completed in accordance with the approved plans and specifications
and state the date the work was completed.
e. The Town shall approve the Regime’s request for reimbursement
unless it determines that t he requested reimbursement includes
work other than the work authorized and approved by the Town.
f. Within three (3) fiscal years following the T own’s approval of the
Regime’s request for reimbursement, the Town shall reimburse the
Regime in the amount approved.
g. Requests for reimbursement by the Regime be submitted to the
Town within three years following the completion of the work by the
Regime. The failure to submit the request for reimbursement to the
Town within three years following completion of the Work shall bar
any reimbursement for the work.
Page 65 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 25 of 33
11. No Guarantees Regarding Flooding: The Regime acknowledges that the
Town’s performance of its obligations under this Agreement does not guarantee or
insure that property within the D evelopment will be free of events of flooding or
erosion, and that the T own does not represent or warrant t o the Regime that the
performance of the T own’s obligations under this Agreement will operate to
prevent events of flooding or erosion within the Development.
12. Waiver of Storm Water Service Fee Credit: Upon the execution and delivery
of this Agreement, and for and during the term or any extensions hereof , the
Regime acknowledges it shall not be entitled to receive and hereby waives any
Storm Water Service Fee Credit from Beaufort County or the Town with respect to
any real property located within the limits of the Development, for and during the
term of this Agreement or any renewal of this Agreement.
13. Term: This Agreement shall rema in in place f or ten years f rom the date of
execution and shall renew automatically for successive two (2) year terms
beginning July 1 each year thereafter , unless either Party notifies the other, in
writing, of its intention to terminate this Agreement. Any such notice shall be
delivered not less than two hundred and seventy (270) days prior to the end of the
Town fiscal year (June 30) at the end of the then-current term in which such Party
wishes to terminate the Agreement. Upon delivery of such notice, this Agreement
shall terminate at midnight on J une 30th of the fiscal year in which the notice is
delivered (for example, if notice is given February 1, 2020, the Agreement would
terminate on June 30, 2021). The parties shall thereafter execute and deliver such
Page 66 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 26 of 33
documents as may be necessary to cancel the Access, Drainage and Maintenance
Easement delivered pursuant to this Agreement.
a. Superseding Legislation: In the event that the South Carolina General
Assembly enacts legislation prohibiting the ability of local governments to
impose and collect Storm Water Service Fees , then this Agreement shall
terminate.
14. Representation and Warranties of the Regime:
The Regime represents and warrants:
a. That any and all necessary approvals and/or resolutions have been
obtained, that it has the full authority to execute, deliver and perform
this Agreement and to execute and deliver the Access, Drainage and
Maintenance Easement to be delivered pursuant to this Agreement,
and that the individual(s) executing such documents have full power
and authority to bind the Regime to the same.
b. That it is not now a party to any litigation affecting the property
burdened by the easements herein which could impair the
obligations of the Regime under this Agreement or the Access,
Drainage and Maintenance Easement , and the Regime knows of no
litigation or threatened litigation affecting their ability to grant said
easements.
c. That as to any pipes or other portions of the Drainage System as
shown on Exhibit “A” hereto which are located in whole or in part on
private residential lots , the Regime has full authority under the
Page 67 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 27 of 33
Covenants to convey or assign to the Town the rights contemplated
in this Agreement and the Access, Drainage and Maintenance
Easement.
15. Town Representation and Warranties:
The Town represents and warrants to the Regime:
a. As is shown by the Resolution of the TOWN that is attached hereto
as Exhibit “ D”, the Town represents that it has the power and
authority to enter into this Agreement and complete its obligations
hereunder; and,
b. That it is not now a party to any litigation which could impair the
obligations of the Town under this Agreement, and the Town knows
of no litigation or threatened litigation affecting its ability to perform
hereunder.
16. Taxes: The Regime shall ensure payment, prior to delinquency, all taxes on
Regime properties within the D evelopment burdened by the easements granted
under this Agreement.
17. Default: The Town and the Regime agree that in the event of a default or
breach of any provision or term of this Agreement, the non -defaulting party or
parties shall give written notice to the defaulting party or parties of the default or
breach. In the event that the defaulting party or parties fail to cure the default or
breach within thirty (30) days of the date of the written notice specifying the
default or breach, unless a non-monetary default or breach cannot reasonably be
cured within said thirty (30) day time period, then said period shall be reasonably
Page 68 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 28 of 33
extended, up to one hundred and twenty (120) days, then the non-defaulting party
or parties shall be entitled to pursue any remedy at law or in equity against the
defaulting party or parties, including but not limited to an action for damages,
injunction or specific performance of this Agreement.
18. Attorney’s Fees: If any legal action or other proceeding is brought for the
enforcement of this Agreement, or because of a dispute, breach, default or
misrepresentation in connection with any of the provisions or terms of this
Agreement, the prevailing party or parties sh all be entitled to seek recovery of its
or their reasonable attorney’s fees and any costs incurred as a result of any such
action or proceeding, whether incurred before the commencement of suit or after
the commencement of suit, and including appellate proceedings, in addition to any
other relief to which the prevailing party or parties is or are entitled.
19. General Provisions:
a. Binding Effect: This Agreement shall inure to the benefit of and be
binding upo n the Regime and the T own, and their respective
successors and assigns.
b. Amendment, Changes and Modifications: Except as is otherwise
provided herein, this Agreement may not be modified, amended,
changed, or altered without the written consent of the TOWN and the
Regime.
c. Severability: In the event that any term or provision of this
Agreement shall be held to be invalid or unenforceable by any court
Page 69 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 29 of 33
of competent jurisdiction, such holding shall not invalidate or render
unenforceable any other term or provision hereof.
d. Execution in Counterparts: This Agreement may be simultaneously
executed in several counterparts, each of which shall be an original,
and all of which shall constitute one and the same instrument.
e. Applicable Law: This Agreement shall be governed by and construed
in accordance with the laws of the State of South Carolina.
f. Captions: The captions or headings used herein are for convenience
only and in no way define, limit, expand or describe the scope or
intent of any term or provision of this Agreement.
g. Plural/Singular: Where appropriate, the use of the singular herein
shall be deemed to include the plural, and the use of the plural herein
shall be deemed to include the use of the singular.
h. No Third-Party Beneficiaries: The Town and the Regime
affirmatively represent that this Agreement is made solely for the
benefit of the Parties hereto and their respective successor s and
assigns and not for the benefit of any third party who is not a
signature party hereto. It is the express intent of the T own and the
Regime that no other party shall have any enforceable rights
hereunder, or any right to the enforcement hereof, or to any claim for
damages as a result of any alleged breach hereof.
i. Notices: All notices, applications, requests, certificates, or other
communications required hereunder shall be sufficiently given and
Page 70 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 30 of 33
shall be deemed given on the date when such is delivered in person,
or deposited in the United States Mail, by regular first -class mail,
postage prepaid, at the following addresses, or at such other address
as may be designated, in writing, by the Parties:
To the Town: The Town of Hilton Head Island, SC
Attn: Marc Orlando, Town Manager
One Town Center Court
Hilton Head Island, SC 29928
To the Regime: Broad Creek Landing Horizontal Property
Regime, Inc.
Attn: Carolyn Neely
C/O: Association Services
1040 William Hilton Parkway, Suite 200
Hilton Head Island, SC 29928
j. No Waiver: No failure of any Party hereto to exercise any power or
right given to such Party hereunder, or to insist on strict compliance
by any other Party of its obligations hereunder, and no custom or
practice of the Parties at variance with the terms and provisions
hereof shall constitute a waiver of any Party’s right to thereafter
demand strict compliance with the terms of this Agreement.
k. Further Assurances and Corrective Documents: The TOWN and the
Regime agree to do, execute, acknowledge, deliver or cause to be
done all such further acts as may be reasonably determined to be
necessary to carry out this Agreement and give effect to the terms
and provisions hereof. The Town and the Regime agree that each
shall, upon request, execute and deliver such other or further or
Page 71 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 31 of 33
corrective documents as may be reasonably determined to be
necessary to carry out this Agreement and each of the terms and
provisions hereof.
In Witness Whereof, The Town of Hilton Head Island, South Carolina; and Broad
Creek Landing Horizontal Property Regime, Inc. , by and through their duly authorized
officers, have executed and delivered this Agreement as of this ___ day of
______________, 202__.
SIGNATURES BEGIN ON NEXT PAGE
Page 72 of 218
Page 73 of 218
Standard Language Adopted on 11-04-2020
Revised on 04-23-2024
Page 33 of 33
List of Exhibits
Exhibit A Map depicting the limits of the Access, Drainage and Maintenance
Easement areas and Drainage Systems covered by this Agreement
Exhibit B Map depicting the Development covered by this Agreement
Exhibit C Access, Drainage and Maintenance Easement
Exhibit D Town Resolution authorizing this Agreement
Page 74 of 218
Revised on 04-23-2024
Page 1 of 9
STATE OF SOUTH CAROLINA ) ACCESS, DRAINAGE AND
) MAINTENANCE EASEMENT
COUNTY OF BEAUFORT )
Know all men by these presents, that Broad Creek Landing Horizontal Property Regime,
Inc. and the Town of Hilton Head Island, South Carolina, One Town Center Court, Hilton
Head Island, SC, 29928, for and in consideration of the sum of One and No/100 ($1.00)
Dollar, each paid to the other at and before the execution and delivery of this Access,
Drainage and Maintenance Easement, the receipt and sufficiency whereof is
acknowledged, agree as follows:
1. Defined Terms: As used herein, the following terms shall mean:
(a) Covenants: Any one or more of Covenants, Conditions, and
Restrictions for Broad Creek Landing Horizontal Property Regime,
Inc. recorded in the Office of the Register of Deeds for Beaufort
County. South Carolina.
(b) Development: Broad Creek Landing , a planned unit development or
subdivision lying and being on Hilton Head Island, Beaufort County,
South Carolina, which is shown and described on the map attached
as Exhibit “B” hereto.
(c) Drainage System: The existing system of lagoons, ditches, canals,
pipes, culverts, catch basins, drains, manholes, junction boxes, weirs,
valves, gates, pumps, structures, related equipment, and related
Page 75 of 218
Revised on 04-23-2024
Page 2 of 9
infrastructure, in the Development lying within the Easement Areas
shown on the map attached hereto as Exhibit “A ,” which facilitates
the collection, storage and conveyance of storm and surface water
runoff for public benefit through, within, and from the Development.
For purposes of this Agreement, the Drainage System shall not
include any bridges, docks, retaining walls, road or pathway asphalt,
road or building gutters, underdrains, sub -drains, structural
bulkheads, beaches, tidal banks, estuaries, or salt marshes, or
driveway pipes, unless the Town, in its sole discretion deems any
particular driveway pipe as critical to the function of the Drainage
System.
(d) Emergency: A blockage, structural or mechanical failure, collapse or
other sudden catastrophic event affecting any part of the Drainage
System which prevents or substantially inhibits the flow of storm and
surface water through all or any part of the Drainage System, or
which otherwise results in an imminent peril to life or property.
(e) Permanent Structure: Any immovable structure, including, but not
limited to, buildings , sheds, pavilions, walls, masonry structures,
tennis courts, and swimming pools, including swimming pool decks.
(f) Regime: Broad Creek Landing Horizontal Property Regime, Inc ., a
South Carolina not -for-profit corporation with the full authority
under the Covenants to enter into this Agreement.
(g) Town: The Town of Hilton Head Island, South Carolina.
Page 76 of 218
Revised on 04-23-2024
Page 3 of 9
2. Grant of Easements: The Regime does hereby grant, transfer, sell and convey to
the Town, and its agents, assigns, employees and contractors, and their vehicles,
machinery, and equipment, and create and establish for the benefit of the Town, the
following easements:
(a) A non-exclusive Access Easement on, over and across any roads and
streets within the Development , and on, over and across any property
owned b y the Regime encumbered by all or any part of the Drainage
System. This Access Easement includes a non -exclusive and partial
assignment of any and all easement rights for access held by the Regime,
under the Covenants or any other declaration of covenants and restrictions,
recorded easements or otherwise, over property that the Regime does not
own within the Development and upon which any part of the Drainage
System lies or passes on, across, under or through.
(b) A non-exclusive Maintenance Easement on, under, over, through and
across any property of the Development , encumbered by all or any part of
the Drainage System. This Maintenance Easement includes a non -exclusive
and partial assignment of any and all easement rights for maintenance,
construction, or ot herwise, held by the Regime under the Covenants or any
other declaration of covenants and restrictions, recorded easements or
otherwise, over property that the Regime does not own within the
Development and upon which any part of the Drainage System lies or
passes on, across, under or through. This Maintenance Easement shall
include all facilities or structures directly related to the collection, storage
Page 77 of 218
Revised on 04-23-2024
Page 4 of 9
and conveyance of storm and surface water now or hereafter existing within
the Development , and sufficient property beside or over any part of the
Drainage System as shown on Exhibit “A” to allow for excavation and any
other work necessary to improve, repair or maintain the Drainage System.
(c) A non-exclusive Drainage Easement for the conveyance of any storm
and surface water originating from within or without the boundaries of the
Development through the Drainage System, at such rates and in such
amounts as may occur from time to time.
(d) This Drainage Easement includes a non -exclusive and partial
assignment of any and all easement rights for drainage held b y the Regime
under the Covenants or any other recorded declaration of covenants and
restrictions, recorded easements or otherwise, over property that the
Regime does not own within the Development and upon which any part of
the Drainage System lies or passes on, acros s, under or through; p rovided
however, that the Town shall provide timely written notification to the
Regime of any potentially disruptive improvements and/or modifications to
the systems conveying storm and surface water originating without the
boundaries of the Development and through the Development Drainage
System.
3. This Access, Drainage and Maintenance Easement is granted and accepted subject
to the following:
(a) The Town agrees that the use of the easements granted herein shall
be restricted to the hours of 7:00 o’clock, A.M., to 5:00 o’clock, P.M.,
Page 78 of 218
Revised on 04-23-2024
Page 5 of 9
Monday through Friday excluding public holidays, except in the event of an
Emergency.
(b) Other than in the case of an Emergency, the Town an d the Regime
shall determine the scheduling of any work to be performed hereunder , on
its or their property, in advance of the commencement of the work.
(c) This Access, Drainage and Maintenance Easement is conveyed
subject to all other easements, licenses, and conveyances of record and is
subject to the rights herein reserved b y the Regime, their successors and
assigns, to utilize their property at any time, in any manner, and for any
purpose, provided, however, that such use by the Regime shall not be
inconsistent with nor prevent the full utilization by the Town of the rights
and privileges granted herein.
(d) The Town agrees to plan, lay out, and execute or build
improvements, make repairs, and otherwise maintain the Drainage System,
and further agrees that the Town’s exercise of the rights granted in this
Access, Drainage and Maintenance Easement shall be under the exclusive
control of the Town and that the Town shall at all times comply with all
applicable laws, rules, codes, and regulations.
(e) The Regime shall not erect any Permanent Structure on, under, over,
through and across any pr operty of the Development encumbered by all or
any part of the Drainage System without the Town’s prior written approval,
which approval shall not be unreasonably withheld. The Regime shall not
impede, obstruct, or allow to be obstructed, the natural flow of storm and
Page 79 of 218
Revised on 04-23-2024
Page 6 of 9
surface water runoff through the Drainage System ; provided, however, that
the Regime shall have a continuing obligation under the Covenants to repair
and maintain various improvements located within the Common Properties
(lagoons and lagoon banks, roads, pathways, utilities, etc.), and this
Agreement is not intended to in any way restrict or limit the Regime from
taking reasonable actions to perform said obligations.
(f) The rights conveyed under this Access, Drainage and Maintenance
Easement are limited to the parties and purposes stated herein. This
Access, Drainage and Maintenance Easement conveys no rights of access or
otherwise to the general public.
4. The Regime acknowledges that the Town shall have no obligation to perform or
pay for any work to repair, improve or maintain the appearance or appeal of the lagoons,
banks of lagoons, landscaping, drains, canals, or other visible components of the
Drainage System, including, but not limited to, structures, bridges, bulkheads, pipes,
culverts, valves, and gates.
5. The Town agrees to cause all work contemplated hereunder to be performed in a
workmanlike fashion with minimal interference to the Grantor, its successors, assigns,
invitees, guests, licensees, and agents. The Town further agrees to cause the work
contemplated hereunder to be completed in an expeditious and timely fashion, and that
all materials, debris, and construction materials shall be promptly removed. The Town
shall restore any other part of the property of the Regime which may be damaged as a
result of the Town’s exercise of the rights granted hereunder to its pre-existing state.
6. The Town hereby warrants to the Regime that the granting of this Access, Drainage
Page 80 of 218
Revised on 04-23-2024
Page 7 of 9
and Maintenance Easement will not affect any “set back” lines with respect to any
property currently owned by the Regime.
To have and to hold, all and singular, the rights, privileges, and easements
aforesaid unto the Town of Hilton Head Island, South Carolina, its successors, and
assigns, forever.
In Witness whereof, the parties hereto have caused the within Access, Drainage
and Maintenance Easement to be executed by their duly authorized officers as of this
______ day of _____________, 202__.
Page 81 of 218
Page 82 of 218
Revised on 04-23-2024
Page 9 of 9
WITNESSES: THE TOWN OF HILTON HEAD ISLAND,
SOUTH CAROLINA
By: _____
Alan Perry, Mayor
Attest: ______
Marc Orlando, Town Manager
STATE OF SOUTH CAROLINA ) UNIFORM ACKNOWLEDGMENT
)
COUNTY OF BEAUFORT ) S.C. CODE § 30-5-30 (SUPP. 2010)
I, the undersigned Notary Public do hereby certify that Alan Perry and Marc
Orlando personally appeared before me on this day and duly acknowledged the execution
of the foregoing instrument on behalf of The Town of Hilton Head Island, South Carolina.
Sworn to and Subscribed before me
on this _____Day of _______________, 202__.
Notary Public for South Carolina
My Commission Expires:_________
Page 83 of 218
SHIPWATCH
POINT
KINGBIRD LANE
BROAD CREEK LANDING DRIVE
FOREST COVE
COMPASS POINT
DEIXLER
LANE
THREE MAST LANE
POINT
COMFORT ROAD
ANCHORAGE POINT
ASHTON COVE DRIVE
SONG SPARROW LANE
QUARTERMASTER
BO
BW
HITE
LANE
Exhibit A
Broad Creek Landing
Drainage Easement Agreement Limits ³
0 75 150 225 30037.5
Feet
The information on this map has been compiled from a variety
of sources and is intended to be used only as a guide. It is
provided without any warranty or representation as to the
accuracy or completeness of the data shown. The Town of
Hilton Head Island assumes no liability for its accuracy or
state of completion or for any losses arising from the use of
the map.
Note: Drainage easement widths are 20 feet around pipes
that convey public runoff and 15 feet from the edge of bank
of lagoons that receive public runoff.
Drainage Easement Area Access Limits Broad Creek Landing Agreement Area Drafted on March 13, 2024
Page 84 of 218
SHIPWATCH
POINT
KINGBIRD LANE
BROAD CREEK LANDING DRIVE
FOREST COVE
COMPASS POINT
DEIXLER
LANE
THREE MAST LANE
POINT
COMFORT ROAD
ANCHORAGE POINT
ASHTON COVE DRIVE
SONG SPARROW LANE
QUARTERMASTER
BO
BW
HITE
LANE
Exhibit B
Broad Creek Landing - Development Boundary ³
0 75 150 225 30037.5
Feet
The information on this map has been compiled from a variety
of sources and is intended to be used only as a guide. It is
provided without any warranty or representation as to the
accuracy or completeness of the data shown. The Town of
Hilton Head Island assumes no liability for its accuracy or
state of completion or for any losses arising from the use of
the map.
Note: Drainage easement widths are 20 feet around pipes
that convey public runoff and 15 feet from the edge of bank
of lagoons that receive public runoff.
Broad Creek Landing Agreement Area Drafted on March 13, 2024
Page 85 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 1 of 33
STATE OF SOUTH CAROLINA )
) DRAINAGE SYSTEM
COUNTY OF BEAUFORT ) MAINTENANCE AGREEMENT
This Drainage System Maintenance Agreement is made this _____ day of
________, 202__, by and between Paddocks on Jarvis Creek Property Owners’
Association, Inc., a South Carolina nonprofit organization, and the Town of Hilton Head
Island, South Carolina, a body politic, having an address of One Town Center Court,
Hilton Head Island, South Carolina, 29928.
WITNESSETH
WHEREAS, Paddocks on Jarvis Creek is a subdivision of land lyi ng and being
within the Town of Hilton Head Island, Beaufort County, South Carolina (hereinafter the
“Development”); and,
WHEREAS, Paddocks on Jarvis Creek Property Owners’ Association, Inc. , is the
owner of improved and unimproved real property and easements within Paddocks on
Jarvis Creek; and,
WHEREAS, Beaufort County, South Carolina, has adopted Ordinance 99 -101, et
seq., as amended, creating a Storm Water Utility with the power to impose Storm Water
Utility Service Fees on all residents of Beaufort County, South Carolina, and which also
provides that Storm Water Utility Service Fees collected from property owners within the
Town of Hilton Head Island, South Carolina , are returned to it , less administrative fees,
to be used for the purposes set forth in Ordinance 99-101, et seq., as amended; and,
WHEREAS, the imposition and collection of Storm Water Utility Service Fees
results in a fund available for the construction and maintenance of existing and planned
Page 86 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 2 of 33
infrastructure for the collection and conveyance of storm water runoff within the Town of
Hilton Head Island, South Carolina, and,
WHEREAS, Paddocks on Jarvis Creek Property Owners’ Association, Inc., desires
for the Town of Hilton Head Island, South Carolina, to utilize Storm Water Utility Service
Fees to undertake maintenance and improvement of the storm water drainage system in
Paddocks on Jarvis Creek , to facilitate the conveyance of storm water runoff within and
through the Development; and,
WHEREAS, the Paddocks on Jarvis Creek Property Owners’ Association, Inc., has
agreed to grant access, drainage, and maintenance easements to the T own, in order to
facilitate the maintenance and improvement of the qualifying storm water drainag e
system in Paddocks on Jarvis Creek.
Now, therefore, know all men by these presents, that Paddocks on Jarvis Creek
Property Owners’ Association, Inc., and the Town of Head Island, South Carolina, for and
in consideration of the sum of One and n o/100 ($1.00) Dollar, each paid to the other at
and before the execution and delivery of this Agreement, the receipt and sufficiency
whereof is acknowledged, agree as follows:
1. Defined Terms: As used in this Agreement , the following terms as related to
this agreement shall mean:
a. Agreement: This “Drainage System Maintenance Agreement”.
b. Association: Paddocks on Jarvis Creek Property Owners’
Association, Inc. , a South Carolina not -for-profit corporation with
the full authority under the Covenants to enter into this Agreement
and to complete all of the Association’s obligations under it, and to
Page 87 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 3 of 33
execute and deliver the Access, Drainage and Maintenance Easement
attached hereto as Exhibit “C.”
c. Casualty: The destruction of all or any part of the Drainage S ystem
through a natural disaster.
d. Covenants: Any one or more of Covenants, Conditions, and
Restrictions for Paddocks on Jarvis Creek Property Owners’
Association, Inc. recorded in the Office of the Register of Deeds for
Beaufort County. South Carolina.
e. Development: Paddocks on Jarvis Creek , a planned unit
development or subdivision lying and being on Hilton Head Island,
Beaufort County, South Carolina, which is shown and described on
the map attached as Exhibit “B” hereto.
f. Drainage System: The existing system of lagoons, ditches, canals,
pipes, culverts, catch basins, drains, manholes, junction boxes, weirs,
valves, gates, pumps, structures, related equipment, and related
infrastructure, in the Development lying within the Easement Areas
shown on the map attached hereto as Exhibit “A,” which facilitates
the collection, storage and conveyance of storm and surface water
runoff for public benefit through, within, and from the Development.
For purposes of this Agreement, the Drainage System shall not
include any bridges, docks, retaining walls, road or pathway asphalt,
road or building gutters, underdrains, sub-drains, structural
bulkheads, beaches, tidal banks, estuaries, or salt marshes , or
Page 88 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 4 of 33
driveway pipes, unless the T own, in its sole discretion deems any
particular driveway pipe as critical to the function of the Drainage
System. The Drainage System does not include the underground pipe that
begins at the southern shore of the water body known as “Lake Russell” and
extends to the waters of Old House Creek, or the outfall structure at the end
of the underground drainage pipe at Old House Creek. The Association
does not own the underground pipe or outfall structure, and the Association
acknowledges that the Town has no responsibility or obligation to maintain
the underground pipe under the terms of this Agreement.
g. Emergency: A blockage, structural or mechanical failure, collapse
or other sudden catastrophic event affecting any part of the Drainage
System which prevents or substantially inhibits the flow of storm and
surface water through all or any part of the Drainage System, or
which otherwise results in an imminent peril to life or property.
h. Permanent Structure: Any immovable structure, including, but not
limited to, buildings , sheds, pavilions, walls, masonry structures,
tennis courts, and swimming pools, including swimming pool decks.
i. Pollutant: A nything which causes or contributes to pollution.
Pollutants may include, but are not limited to: paints, varnishes, and
solvents; petroleum hydrocarbons; automotive fluids; cooking
grease; detergents (biodegradable or otherwise); degreasers;
cleaning chemicals; non-hazardous liquid and solid wastes and yard
wastes; sediment; refuse, rubbish, garbage, litter, or other discarded
Page 89 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 5 of 33
or abandoned objects and accumulations, so that same may cause or
contribute to pollution; floatables; pesticides, herbicides, and
fertilizers; liquid and solid wastes; sewage, fecal coliform and
pathogens; dissolved and particulate metals; animal wastes; wastes
and residues that result from constructing a building or structure;
concrete and cement; and noxious or offensive matter of any kind.
j. Post-construction Structural Best Management Practice Facility: A
Post-construction Structural Best Management Practice Facility
(BMPF) is a facility designed and built to provide treatment of storm
water either through storage, filtration or infiltration (i.e. detention
basins, retention basins, rain gardens, bioretention cells, sand filters,
vegetated filter strips, water quality swales and infiltration trenches)
as set forth in the latest editions of the Beaufort County Manual for
Storm Water Best Management and Design Practices, the South
Carolina DHEC Storm Water Management BMP Handbook, and the
Georgia Coastal Stormwater Supplement, which include descriptions
standards, and design guidelines for these facilities.
k. Project: Work, including repairs and improvements performed or
approved by the Town to correct a specific Qualifying Storm
Drainage System Deficiency.
l. Qualifying Drainage System Deficienc y: Anything that, in the
determination of the Town , prevents, impairs or impedes the
adequate conveyance or drainage of storm water runoff through the
Page 90 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 6 of 33
Drainage System or the structural failure of a Drainage System
component. Qualifying Drainage System Deficiencies include, but
are not limited to, the following:
i. Lagoon bank erosion that has an appreciable adverse impact
on conveyance of storm water runoff through the Drainage
System or threatens the integrity of adjacent Drainage System
infrastructure or Permanent Structures;
ii. Presence of sediment and debris located in the Drainage
System that has an appreciable adverse impact on the
conveyance of storm water runoff through the Drainage
System or the functioning of the Drainage System;
iii. Structural deficiencies associated with pipes and culverts,
including, but not limited to, joint failures, deterioration, root
intrusion, or collapse that has an appreciable adverse impact
on conveyance of storm water runoff through the Drainage
System or threatens the integrity of adjacent Drainage System
infrastructure or Permanent Structures;
iv. Structural deficiencies associated with inlets , manholes,
junction boxes , control structures and headwalls including ,
but not limited to, connection failure, deterioration,
mechanical failure, or collapse that has an appreciable
adverse impact on conveyance of storm water runoff through
the Drainage System , or that threatens the integrity of
Page 91 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 7 of 33
adjacent infrastructure or Permanent Structures . Examples
of typical deficiencies include damaged grates, grout failures
at pipe connections, deterioration or failure of flap gates and
sluice gates, or failure of structure walls;
v. Sinkholes caused by Drainage System pipe or Drainage
System structure Deficiencies, but not those caused by the
actions of any third party, including utility providers;
vi. Drainage System conveyance or performance deficiencies due
to inadequate design capacity. Examples of t ypical
conveyance or performance deficiencies include undersized
pipes and insufficient weir capacities.
Qualifying Drainage System Deficiencies do not include the
following:
i. The aesthetic appearance or appeal of any part of the Drainage
System, including but not limited to lagoons, banks of
lagoons, channel banks, landscaping, drains, catch basins,
canals, structures, bridges, bulkheads, pipes, culverts,
valves gates, debris that does not have an appreciable
adverse impact on the conveyance of storm and surface
water through the Drainage System , or other visible
components of the Drainage System;
ii. The introduction of pollution or pollutants into the Drainage
System from any source;
Page 92 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 8 of 33
iii. Lagoon bank erosion that does not have an appreciable
adverse impact on conveyance of storm water runoff
through the Drainage System or threaten the integrity of
adjacent Drainage System infrastructure or Permanent
Structures;
iv. Tidal erosion or tidal flooding that does not have an
appreciable adverse impact on conveyance of storm water
runoff through the Drainage System or threaten the
integrity of Drainage System infrastructure;
v. Establishment of access to the Drainage System by the
Association, including, but not limited to, grading, clearing
of vegetation, removal of trees, or removal of other
obstructions or Permanent Structures in order to provide
physical access to the Drainage System;
vi. Drainage System damage or deficiencies caused by the actions
of others, including utilities and property owners (including,
but not limited to, bores or cuts into pipes or structures);
vii. Minor or nuisance flooding that do es not adversely affect
transportation infrastructure, Permanent Structures ,
hardscape amenities, or conveyance of storm water runoff
through the Drainage System , including golf course
flooding, isolated lawn and yard ponding, or standing water
in roadway shoulders and unimproved lots or land;
Page 93 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 9 of 33
viii. Drainage System D eficiencies determined by the T own to be
caused or exacerbated by intentional acts causing tidal
backflow and saltwater intrusion into the Drainage System
through failure to operate control structures per the design
intent or the failure by the A ssociation to monitor and
maintain proper functioning of backflow prevention devices
including flaps, gates, sluice gates, check valves, or similar
devices;
ix. Damage to, or failure of , Drainage System components
situated underneath or within five (5) feet of any Permanent
Structure that is not a part of the Drainage System, where
the Town determines that difficult access and/or liabilities
exist, or within the zone of influence for the foundation of a
Permanent Structure;
x. The construction of a new drainage system or an addition to
an existing Drainage System, or the modification of an
existing Drainage System to accommodate drainage
requirements for new development within the
Development.
xi. Drainage System deficiencies determined by the Town to be
caused by or originating from unauthorized or non -
permitted modifications to the Drainage System by any
party other than the Town.
Page 94 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 10 of 33
xii. Maintenance, repair or replacement of underground pipe that begins
at the southern shore of the water body known as “ Lake Russell”
and extends to the waters of Old House Creek, or the outfall
structure at the end of the underground drainage pipe at Old House
Creek.
m. Storm Water Utility Service Fees: The fees collected by Beaufort
County, South Carolina, under the authority of Beaufort County
Ordinance 99-101, et seq., as amended, and which are remitted by
Beaufort County, South Carolina, to the T own; or any similar fee,
however denominated, imposed and collected by any subsequent or
successor Storm Water Utility operated by The T own, under the
authority of Town Ordinance Number 2002-43.
n. Storm Water Utility Project Prioritization and Annual Budget
Process: The annual process by which t he Town of Hilton Head
Island, South Carolina, shall establish and maintain a prioritized list
of all known Qualifying Drainage System Deficiencies within the
Town limits determined to be eligible for service using Storm Water
Utility Service Fees. Prior to the beginning of each fiscal year, the
Town shall establish an annual Storm Water Utility budget which
defines all revenues and expenditures associated w ith the Storm
Water Utility Service Fees. This budget shall include those known
Projects to correct Qualifying Drainage System Deficiencies intended
to be completed within that fiscal year.
Page 95 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 11 of 33
o. Town: The Town of Hilton Head Island, South Carolina.
2. Grant of Easements: Contemporaneously with the execution and delivery of
this Agreement , the Association and the T own have entered into an “Access,
Drainage and Maintenance Easement” which grants the Town rights to access,
operate, utilize, maintain, and improve the Drainage System within the
Development, with said easement being in the form attached hereto as Exhibit “C”.
3. Maintenance, Inspection and Operation of Drainage System: Upon the
execution and delivery of this Agreement and the Access, Drainage and
Maintenance Easement:
(a) the Town shall be responsible for the maintenance, repairs and
improvements necessary to correct any Qualifying Drainage System
Deficiency under the terms and conditions of this Agreement . T his
Agreement does not preclude the Association from repairing, maintaining,
or improving any component of its Drainage System at its expense.
(b) The A ssociation shall be responsible for the following within the
Development:
(i) Normal and emergency o peration of Drainage System control
structures, including gates, weirs, and pumps , and for lowering
water levels in compliance with pre-storm preparation protocols
established by the Town.
(ii) Maintenance and replacement of weir boards , maintenance of
control structure access ways, decking and railings, and maintaining
Page 96 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 12 of 33
control structure accessibility for inspection and operation by
controlling and/or removing vegetation as necessary.
(iii) Performing maintenance of work shelves along ditches and canals to
provide reasonable and adequate access for inspection, maintenance
and repair.
(iv) Monitoring the condition of flap gates, sluice gates, check valves, and
similar devices intended to prevent the intrusion of tidal backflow
and brackish water into the Drainage System to ensure that they are
in proper working order and functioning as intended.
(v) Making repairs to roadway pavement, pathway pavement, curb and
gutter and related ancillary infrastructure or property damage
attributed to a past or existing Qualifying Drainage System
Deficiency if the deficiency has been corrected by the T own via
trenchless technology methods (i.e. pipe lining) . This does not
obligate the A ssociation to repair or replace such infrastructure if
the repair is made using open cut excavations where removal of
surface infrastructure is necessary to complete the repair , in which
case, the repair of the ancillary infrastructure shall be considered to
be a part of the Town’s work to correct the deficiency.
(vi) Performing annual inspections of Post-construction Structural Best
Management Practice Facilities in order to comply with Stormwater
Management Plan obligations, including submittal of inspec tion
Page 97 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 13 of 33
documentation to the Town in accordance with § 16-5-109 (H)(2),
Municipal Code to the Town of Hilton Head Island (1983).
(vii) Regulating the actions of utility providers and property owners, or
their assigns, to prevent and mitigate any damage they may cause to
the Drainage System.
4. Procedure for Town’s Maintenance of Drainage System: The Parties
acknowledge that the T own intends to provide for the maintenance and
improvement of the Drainage System and the repair of identifi ed Qualifying
Drainage System Deficiencies, other than those caused by an Emergency or
Casualty, through the development of its Storm Water Utility Project Prioritization
and Annual Budget Process. Other than in the case of an Emergency or Casualty,
as described in Articles 7, 8 and 10 below, or work completed directly by the
Association under Article 9, the Parties agree:
a. Identifying Qualifying Drainage System Deficiencies: The
Association shall be responsible for i dentifying any Qualifying
Drainage System Deficiencies.
b. Schedule for Submission: The Association shall submit a written
description of each known Qualifying Drainage System Deficiency to
the Town using the service request form provided by the T own,
describing the nature, location and cause (if known) of each
Qualifying Drainage System Deficiency. The Association may
identify a potential solution is for the deficiency. In such case, the
Association shall include a description of the solution and a
Page 98 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 14 of 33
preliminary estimate of anticipated costs for the proposed solution .
Qualifying Drainage System Deficiencies that are reported to the
Town, or which are discovered by the T own, by the end of any
calendar year will be considered in the development of the Storm
Water Utility Project Prioritization and Annual Budget Process for
the following fiscal year.
c. Completion of Maintenance: The Town shall annually develop a
Storm Water Utility Project Prioritization and an Annual Budget that
will address identified Qualifying Drainage System Deficiencies as
follows:
i. The Town shall determine the scope and extent of the
maintenance, repair or improvement that is necessary to
correct any Qualifying Drainage System Deficiencies, and the
means, methods and materials needed to accomplish the
same.
ii. The Town shall d etermine the priority and number of the
Projects and schedule the Projects to correct to correct the
Qualifying Drainage System Deficiencies for each fiscal year.
The determination of the scheduling and funding for the
correction of the Qualifying Drainage System Deficiencies
shall be made by the Town, taking into account the following:
1. The availability and amount of the Storm Water
Utility Service Fees fund balance, revenue from
Page 99 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 15 of 33
bonds paid by Storm Water Utility Service Fees,
and Storm Water Utility Service Fees in any given
fiscal year;
2. Prioritization of a ll other Projects, or qualifying
requested improvements, repair and maintenance
that are to be funde d with Storm Water Utility
Service Fees; and
3. The annual cost required to operate the Storm
Water Utility, its programs and initiatives, and
debt service.
iii. The T own will c omplete the Projects as determined by the
Town as a part of the Storm Water Utility Project
Prioritization and Annual Budget Process , unless
Emergencies or C asualties occur that alter the prioritization
and funding such that funds are insufficient to correct all
Qualifying Drainage System D eficiencies as intended within
the same fiscal year.
d. Scheduling of Projects: Other than in the case of an Emergency or
Casualty, the T own and the A ssociation shall mutually agree in
writing as to the scheduling of any Project to be performed under this
Agreement in the Development in advance of the commencement of
the Project.
Page 100 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 16 of 33
e. Resident Notification: The Association shall be solely responsible for
the notification of its owners and guests that may be affected by any
Project, or by work to address any Emergency or Casualty.
f. Legal Access to Private Property : The A ssociation shall be
responsible for o btaining all access rights , including access rights
over and across property in the Development that is not owned by
the Association , as may be deemed necessary by the T own to
complete any Project.
g. Access Needed to Complete Project : The A ssociation shall be
responsible for providing clear and adequate physical access to each
Project site at no cost to the Town. If clear, adequate physical access
to the Project site cannot be provided sufficient to complete the
Project without the likelihood of damage to property, assets and
amenities by contractors and equipment, the repair and replacement
of any property, assets and amenities damaged as a result of the
Project shall be the responsibility of the Association, at no additional
cost to the Town. Such property, assets and amenities shall include,
but are not limited to, landscaping, flowerbeds, ornamental shrubs
and trees, lawns, irrigation systems, boardwalks, cart paths,
driveways, and sidewalks. The determination of whether the access
is clear and adequate , and whether there is a likelihood of damage
shall be made in the sole discretion of the T own, prior to the
commencement of the Project . The A ssociation has the right to
Page 101 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 17 of 33
withdraw the service request if the magnitude of potential damage is
not acceptable to the Association . If the service request is
withdrawn, completing the Project shall be the responsibility of the
Association.
h. No Guarantees Regarding Schedule: The Town cannot guarantee
that the amount of available Storm Water Utility Service Fees, the
number of Projects to be funded with Storm Water Utility Service
Fees in any given fiscal year, and whether Emergencies and
Casualties and weather-related general emergencies will not cause
delays in the correction of Qualifying Drainage System Deficiencies
within the D evelopment and elsewhere. The parties acknowledge
that the Town’s determinations with respect to the priority, funding
and timing of any Project shall be made at the Town’s discretion and
shall be final.
5. Further Obligations of the Association: The Association agrees that during
the term, or any re newal term, of this Agreement, it shall take no action which
damages the Drainage S ystem, allows damage to the Drainage System, or creates
a Drainage System Deficiency, including, but not limited to allowing salt water
intrusion or pollutants to enter the Drainage System and allowing utility providers,
property owners, or their assigns to impair the function of the Drainage System .
To the extent the Association has a continuing obligation under the Covenants to
repair and maintain various improvements located within the Development
including lagoons and lagoon banks, ditch maintenance shelves, roads, pathways,
Page 102 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 18 of 33
utilities, this Agreement is not intended to in any way restrict or limit the
Association’s completion of its obligations.
6. Payments as Current Expense of Town: A ny payments to be made by the
Town hereunder shall be made from Storm Water Utility Service Fees as budgeted
for by the Town in any given fiscal year. The Town and the Association intend that
the payment obligations of the Town shall constitute a current expense of the Town
and shall not in any way be construed to be a debt of the Town in contravention of
any applicable constitutional or statutory limitations concerning indebtedness of
the Town, nor shall anything contained herein constitute a pledge of general tax
revenues, funds, money, or credit of the Town.
7. Emergency: The Parties agree that in the event of an Emergency, the following
procedure shall apply:
a. Agreement Not Terminated : This Agreement shall remain in full
force and effect.
b. Responsibilities of the Association: The Association shall take such
steps as may be reasonably necessary to secure any area affected by
the Emergency. The Association shall notify the Town as soon as is
practical after discovery of the Emergency. The Association may
complete any repairs to the Drainage System needed to address the
Emergency, as provided for in Article 10, below.
c. Responsibilities of the Town: Upon receipt of notification of an
Emergency from the Association, the Town shall determine the scope
and extent of the work that is necessary to repair or correct the
Page 103 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 19 of 33
damage caused by the Emergency, and the means, methods and
materials needed to accomplish the same. The Town shall correct or
repair the damage caused by the Emergency as soon as practical,
taking into account the threat presented by the Emergency, the
existence of any other Emergency or Casualty , the cause of the
Emergency and/or the existence of any general emergency affecting
the Town and availability of funding . The T own may seek
reimbursement from third parties for any costs incurred by the Town
as a result of any Emergency found to have been caused by the
negligence of said third parties.
8. Casualty: The Parties agree that in the event of a Casualty, the following
procedure shall apply:
a. Agreement Not Terminated : This Agreement shall remain in full
force and effect.
b. Design of Drainage System: The Town shall produce engineering
and design plans at its expense for the reconstruction of all or any
part of the Drainage System affected by the Casualty.
c. Approval of Plans: The engineering and design plans must be
approved b y the Association prior to any reconstruction of the
Drainage System . If the A ssociation does not approve the
engineering and design plans prepared by the Town, the Association
may reconstruct the Drainage System at its own expense and shall
not seek reimbursement for the cost thereof from the Town.
Page 104 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 20 of 33
d. Right of Entry and Access: If the engineering and design plans
approved by the Association require work outside of easement limits
described in the Access, Drainage and Maintenance Easement , the
Association shall provide temporary easements for access and
construction over any property it owns or controls and shall deliver
a valid temporary construction easement for access and construction
from the owners of property that the Association does not own.
e. Amendment of Access, Drainage and Maintenance Easement : In
the event that the engineering and design plans approved by the
Association include permanent improvements or create access or
other needs that are in areas not included in the Access, Drainage
and Maintenance Easement , the Association agrees that it will
execute and deliver an amendment to the Access, Drainage and
Maintenance Easement to subject any such areas in the Access,
Drainage and Maintenance Easement.
f. Reconstruction of Drainage System: Following the approval of the
engineering and design plans and specifications by the Association,
the Association’s delivery of any needed temporary easements for
access and construction, the Town shall complete the reconstruction
of the Drainage System , or any part of it, as soon as is practical,
taking into account the threat presented by the cause of the Casualty,
the existence of any general emergency affecting the T own, the
existence of other Emergencies and Casualties and availability of
Page 105 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 21 of 33
funding. Other than the expenses identified in subsection (b) of this
Article 8, the Town may seek reimbursement for any costs incurred
by the T own as a result of any Casualty from Storm Water Utility
Service Fees, bond, any government aid and assistance programs, or
the Association, if the A ssociation is responsible for all or any part
of the Casualty.
9. Maintenance of Drainage System by the Association: Nothing herein shall
prohibit the Association from performing any Project in advance of the time that
any such Project is scheduled as a part of the Town’s Storm Water Utility Project
Prioritization and Annual Budget Process , if the Association determines that it is
in its interest to do so. Other than in the case of an Emergency (addressed in Article
10, below), or a Casualty (addressed in Article 8, above), the Association shall be
entitled to reimbursement, in an amount up to the amount budgeted by the Town
for the Project but not exceeding the actual cost to the Association , from Storm
Water Utility Service Fees , in the fiscal year that such Project is scheduled to be
done as a part of Town’s Storm Water Utility Project Prioritization and Annual
Budget Process, as follows;
a. The Association shall submit its plans, quantities, and specifications
for any Project to the Town.
b. The Town shall grant its written approval to the Association to
complete the Project unless it determines that:
Page 106 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 22 of 33
i. The plan and work proposed by the Association will not
correct the existing Qualifying Drainage System
Deficiency; or,
ii. The scope of the p roposed work exceeds what is
necessary to correct the existing Qualifying Drainage
System Deficiency,
c. Upon receipt of the Town ’s written a pproval, the Association shall
bid the work in accordance with the Town’s Procurement Code, § 11-
1-111, Municipal Code of The Town of Hilton Head Island, South
Carolina (1983), as the same may be amended from time to time.
d. Any changes in the approved scope of work for the Project resulting
in additional work or cost to the T own must be approved in writing
by the Town prior to commencement of any additional work.
e. The Association shall notify the Town at least seventy-two (72) hours
prior to the commencement of work on the Project and at any key
junctures of the work where the Town may need to inspect the work.
f. Upon completion of the Project, the Town shall inspect the Project
and provide the Association written approval or rejection of the
Project.
g. If the Project is approved by the Town, the Association shall submit
to the T own its request for reimbursement , which shall include full
documentation of the bid and procurement of the work to complete
the Project , the contract for the work to complete the Project , the
Page 107 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 23 of 33
construction plans, details and as -built surveys or drawings,
measurements, dated inspection reports, photographs of the work in
progress, documentation of the payments made by the Association ,
any required test reports and the Association’s written certification
that the Project was completed in accordance with the approved
plans and specifications.
h. The Town shall thereafter budget funds for reimbursement to the
Association from Storm Water Utility Service Fees in the fiscal year
that the Project would have otherwise been scheduled in the Town’s
Storm Water Utility Project Prioritization and Annual Budget
Process. The schedule for reimbursement shall depend upon the
Project ranking when compared to all other Projects as determined
in the Town’s Storm Water Utility Project Prioritization and Annual
Budget Process and may be moved forward into a future budget year
as a result. The Association acknowledges that the Town has no
obligation to reimburse the Association for any Project in the fiscal
year following the Association’s completion of the Project, or in any
other particular fiscal year.
10. Emergency Work by the Association: If for any reason, the Town is
unable to repair or correct the damage caused by an Emergency in a time frame
that is acceptable to the Association, the following shall apply:
a. The Association shall consult with the Town to determine a cost -
efficient scope and extent of work necessary to repair or correct the
Page 108 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 24 of 33
damage caused by the Emergency, and the means, methods and
materials needed to accomplish the same. The TOWN must approve
in writing, the scope and plans for the work and procurement of
construction services, prior to the commencement of work. The
Association is not required to bid the work but i f the Association
chooses to bid the work, t he A ssociation shall bid the work in
accordance with the Town’s Procurement Code, § 11-1-111, Municipal
Code of The Town of Hilton Head Island, South Carolina (1983), as
the same may be amended from time to time.
b. The Association shall complete the work that is necessary to repair
or correct the damage caused by the Emergency.
c. The A ssociation shall, whenever possible, notify the Town at least
seventy-two (72) hours prior to the commencement of work and at
any key junctures of the work whereas the Town may need to inspect
the work.
d. Upon completion of the work that has been authorized and approved
by the Town, the Association shall submit to the Town a request for
reimbursement, which shall include full documentation of the bid
and procurement documents for the work, the contract for the work,
construction plans, details and as -built surveys or drawings,
measurements, dated inspection reports , photographs of the work
done and documentation of the payments made, any required test
reports and the Association’s written certification that the work was
Page 109 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 25 of 33
completed in accordance with the approved plans and specifications
and state the date the work was completed.
e. The Town shall approve the Association’s request for reimbursement
unless it determines that t he requested reimbursement includes
work other than the work authorized and approved by the Town.
f. Within three (3) fiscal years following the T own’s approval of the
Association’s request for reimbursement, the Town shall reimburse
the Association in the amount approved.
g. Requests for reimbursement by the Association be submitted to the
Town within three years following the completion of the work by the
Association. The failure to submit the request for reimbursement to
the Town within three years following completion of the Work shall
bar any reimbursement for the work.
11. No Guarantees Regarding Flooding: The Association acknowledges that the
Town’s performance of its obligations under this Agreement does not guarantee or
insure that property within the D evelopment will be free of events of flooding or
erosion, and that the T own does not represent or warrant t o the Association that
the performance of the T own’s obligations under this Agreement will operate to
prevent events of flooding or erosion within the Development.
12. Waiver of Storm Water Service Fee Credit: Upon the execution and delivery
of this Agreement, and for and during the term or any extensions hereof , the
Association acknowledges it shall not be entitled to receive and hereby waives any
Storm Water Service Fee Credit from Beaufort County or the Town with respect to
Page 110 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 26 of 33
any real property located within the limits of the Development, for and during the
term of this Agreement or any renewal of this Agreement.
13. Term: This Agreement shall rema in in place f or ten years f rom the date of
execution and shall renew automatically for successive two (2) year terms
beginning July 1 each year thereafter , unless either Party notifies the other, in
writing, of its intention to terminate this Agreement. Any such notice shall be
delivered not less than two hundred and seventy (270) days prior to the end of the
Town fiscal year (June 30) at the end of the then-current term in which such Party
wishes to terminate the Agreement. Upon delivery of such notice, this Agreement
shall terminate at midnight on J une 30th of the fiscal year in which the notice is
delivered (for example, if notice is given February 1, 2020, the Agreemen t would
terminate on June 30, 2021). The parties shall thereafter execute and deliver such
documents as may be necessary to cancel the Access, Drainage and Maintenance
Easement delivered pursuant to this Agreement.
a. Superseding Legislation: In the event that the South Carolina General
Assembly enacts legislation prohibiting the ability of local governments to
impose and collect Storm Water Service Fees , then this Agreement shall
terminate.
14. Representation and Warranties of the Association:
The Association represents and warrants:
a. That any and all necessary approvals and/or resolutions have been
obtained, that it has the full authority to execute, deliver and perform
this Agreement and to execute and deliver the Access, Drainage and
Page 111 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 27 of 33
Maintenance Easement to be delivered pursuant to this Agreement,
and that the individual(s) executing such documents have full power
and authority to bind the Association to the same.
b. That it is not now a party to any litigation affecting the property
burdened by the easements herein which could impair the
obligations of the Association under this Agreement or the Access,
Drainage and Maintenance Easement, and the Association knows of
no litigation or threatened litigation affecting their ability to grant
said easements.
c. That as to any pipes or other portions of the Drainage System as
shown on Exhibit “A” hereto which are located in whole or in part on
private residential lots, the Association has full authority under the
Covenants to convey or assign to the Town the rights contemplated
in this Agreement and the Access, Drainage and Maintenance
Easement.
15. Town Representation and Warranties:
The Town represents and warrants to the Association:
a. As is shown by the Resolution of the TOWN that is attached hereto
as Exhibit “ D”, the Town represents that it has the power and
authority to enter into this Agreement and complete its obligations
hereunder; and,
b. That it is not now a party to any litigation which could impair the
obligations of the Town under this Agreement, and the Town knows
Page 112 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 28 of 33
of no litigation or threatened litigation affecting its ability to perform
hereunder.
16. Taxes: The A ssociation shall ensure payment, prior to delinquency, all taxes on
Association properties within the D evelopment burdened by the easements
granted under this Agreement.
17. Default: The Town and the Association agree that in the event of a default or
breach of any provision or term of this Agreement, the non- defaulting party or
parties shall give written notice to the defaulting party or parties of the default or
breach. In the event that the defaulting party or parties fail to cure the default or
breach within thirty (30) days of the date of the written notice specifying the
default or breach, unless a non-monetary default or breach cannot reasonably be
cured within said thirty (30) day time period, then said period shall be reasonably
extended, up to one hundred and twenty (120) days, then the non-defaulting party
or parties shall be entitled to pursue any remedy at law or in equity against the
defaulting party or parties, including but not limited to an action for damages,
injunction or specific performance of this Agreement.
18. Attorney’s Fees: If any legal action or other proceeding is brought for the
enforcement of this Agreement, or because of a dispute, breach, default or
misrepresentation in connection with any of the provisions or terms of this
Agreement, the prevailing party or parties sh all be entitled to seek recovery of its
or their reasonable attorney’s fees and any costs incurred as a result of any such
action or proceeding, whether incurred before the commencement of suit or after
Page 113 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 29 of 33
the commencement of suit, and including appellate proceedings, in addition to any
other relief to which the prevailing party or parties is or are entitled.
19. General Provisions:
a. Binding Effect: This Agreement shall inure to the benefit of and be
binding upo n the Association and the T own, and their respective
successors and assigns.
b. Amendment, Changes and Modifications: Except as is otherwise
provided herein, this Agreement may not be modified, amended,
changed, or altered without the written consent of the TOWN and the
Association.
c. Severability: In the event that any term or provision of this
Agreement shall be held to be invalid or unenforceable by any court
of competent jurisdiction, such holding shall not invalidate or render
unenforceable any other term or provision hereof.
d. Execution in Counterparts: This Agreement may be simultaneously
executed in several counterparts, each of which shall be an original,
and all of which shall constitute one and the same instrument.
e. Applicable Law: This Agreement shall be governed by and construed
in accordance with the laws of the State of South Carolina.
f. Captions: The captions or headings used herein are for convenience
only and in no way define, limit, expand or describe the scope or
intent of any term or provision of this Agreement.
Page 114 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 30 of 33
g. Plural/Singular: Where appropriate, the use of the singular herein
shall be deemed to include the plural, and the use of the plural herein
shall be deemed to include the use of the singular.
h. No Third-Party Beneficiaries: The Town and the Association
affirmatively represent that this Agreement is made solely for the
benefit of the Parties hereto and their respective successor s and
assigns and not for the benefit of any third party who is not a
signature party hereto. It is the express intent of the T own and the
Association that no other party shall have any enforceable rights
hereunder, or any right to the enforcement hereof, or to any claim for
damages as a result of any alleged breach hereof.
i. Notices: All notices, applications, requests, certificates, or other
communications required hereunder shall be sufficiently given and
shall be deemed given on the date when such is delivered in person,
or deposited in the United States Mail, by regular first -class mail,
postage prepaid, at the following addresses, or at such other address
as may be designated, in writing, by the Parties:
To the Town: The Town of Hilton Head Island, SC
Attn: Marc Orlando, Town Manager
One Town Center Court
Hilton Head Island, SC 29928
To the Association: Paddocks on Jarvis Creek Property Owners
Association, Inc.
c/o GW Services, Inc.
PO Box 6476
Hilton Head Island, SC 29938
Page 115 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 31 of 33
j. No Waiver: No failure of any Party hereto to exercise any power or
right given to such Party hereunder, or to insist on strict compliance
by any other Party of its obligations hereunder, and no custom or
practice of the Parties at variance with the terms and provisions
hereof shall constitute a waiver of any Party’s right to thereafter
demand strict compliance with the terms of this Agreement.
k. Further Assurances and Corrective Documents: The TOWN and the
Association agree to do, execute, acknowledge, deliver or cause to be
done all such further acts as may be reasonably determined to be
necessary to carry out this Agreement and give effect to the terms
and provisions hereof. The Town and the Association agree that each
shall, upon request, execute and deliver such other or further or
corrective documents as may be reasonably determined to be
necessary to carry out this Agreement and each of the terms and
provisions hereof.
In Witness Whereof , The Town of Hilton Head Island, South Carolina; and
Paddocks on Jarvis Creek Property Owners’ Association, Inc. , by and through their duly
authorized officers, have executed and delivered this Agreement as of this ___ day of
______________, 202__.
SIGNATURES BEGIN ON NEXT PAGE
Page 116 of 218
Page 117 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-28-2024
Page 33 of 33
List of Exhibits
Exhibit A Map depicting the limits of the Access, Drainage and Maintenance
Easement areas and Drainage Systems covered by this Agreement
Exhibit B Map depicting the Development covered by this Agreement
Exhibit C Access, Drainage and Maintenance Easement
Exhibit D Town Resolution authorizing this Agreement
Page 118 of 218
Revised on 03-28-2024
Page 1 of 9
STATE OF SOUTH CAROLINA ) ACCESS, DRAINAGE AND
) MAINTENANCE EASEMENT
COUNTY OF BEAUFORT )
Know all men by these presents, that Paddocks on Jarvis Creek Property Owners’
Association, Inc. and the Town of Hilton Head Island, South Carolina, One Town Center
Court, Hilton Head Island, SC, 29928, for and in consideration of the sum of One and
No/100 ($1.00) Dollar, each paid to the other at and before the execution and delivery of
this Access, Drainage and Maintenance Easement, the receipt and sufficiency whereof is
acknowledged, agree as follows:
1. Defined Terms: As used herein, the following terms shall mean:
(a) Association: Paddocks on Jarvis Creek Property Owners’
Association, Inc. , a South Carolina not -for-profit corporation with
the full authority under the Covenants to enter into this Agreement.
(b) Covenants: Any one or more of Covenants, Conditions, and
Restrictions for Paddocks on Jarvis Creek Property Owners’
Association, Inc. recorded in the Office of the Register of Deeds for
Beaufort County. South Carolina.
(c) Development: Paddocks on Jarvis Creek , a planned unit
development or subdivision lying and being on Hilton Head Island,
Beaufort County, South Carolina, which is shown and described on
the map attached as Exhibit “B” hereto.
Page 119 of 218
Revised on 03-28-2024
Page 2 of 9
(d) Drainage System: The existing system of lagoons, ditches, canals,
pipes, culverts, catch basins, drains, manholes, junction boxes, weirs,
valves, gates, pumps, structures, related equipment, and related
infrastructure, in the Development lying within the Easement Areas
shown on the map attached hereto as Exhibit “A ,” which facilitates
the collection, storage and conveyance of storm and surface water
runoff for public benefit through, within, and from the Development.
For purposes of this Agreement, the Drainage System shall not
include any bridges, docks, retaining walls, road or pathway asphalt,
road or building gutters, underdrains, sub -drains, structural
bulkheads, beaches, tidal banks, estuaries, or salt marshes, or
driveway pipes, unless the Town, in its sole discretion deems any
particular driveway pipe as critical to the function of the Drainage
System. The Drainage System does not include the underground pipe that
begins at the southern shore of the water body known as “Lake Russell” and
extends to the waters of Old House Creek, or the outfall structure at the end
of the underground drainage pipe at Old House Creek. The Association
does not own the underground pipe or outfall structure, and the Association
acknowledges that the Town has no responsibility or obligation to maintain
the underground pipe under the terms of this Easement.
(e) Emergency: A blockage, structural or mechanical failure, collapse or
other sudden catastrophic event affecting any part of the Drainage
System which prevents or substantially inhibits the flow of storm and
Page 120 of 218
Revised on 03-28-2024
Page 3 of 9
surface water through all or any part of the Drainage System, or
which otherwise results in an imminent peril to life or property.
(f) Permanent Structure: Any immovable structure, including, but not
limited to, buildings , sheds, pavilions, walls, masonry structures,
tennis courts, and swimming pools, including swimming pool decks.
(g) Town: The Town of Hilton Head Island, South Carolina.
2. Grant of Easements: The Association does hereby grant, transfer, sell and convey
to the Town, and its agents, assigns, employees and contractors, and their vehicles,
machinery, and equipment, and create and establish for the benefit of the Town, the
following easements:
(a) A non-exclusive Access Easement on, over and across any roads and
streets within the Development , and on, over and across any property
owned b y the Association encumbered by all or any part of the Drainage
System. This Access Easement includes a non -exclusive and partial
assignment of any and all easement rights for access held by the
Association, under the Covenants or any other declaration of covenants and
restrictions, recorded easements or otherwise, over property that the
Association does not own within the Development and upon which any part
of the Drainage System lies or passes on, across, under or through.
(b) A non-exclusive Maintenance Easement on, under, over, through and
across any property of the Development , encumbered by all or any part of
the Drainage System. This Maintenance Easement includes a non -exclusive
and partial assignment of any and all easement rights for maintenance,
Page 121 of 218
Revised on 03-28-2024
Page 4 of 9
construction, or ot herwise, held by the Association under the Covenants or
any other declaration of covenants and restrictions, recorded easements or
otherwise, over property that the Association does not own within the
Development and upon which any part of the Drainage System lies or
passes on, across, under or through. This Maintenance Easement shall
include all facilities or structures directly related to the collection, storage
and conveyance of storm and surface water now or hereafter existing within
the Development , and sufficient property beside or over any part of the
Drainage System as shown on Exhibit “A” to allow for excavation and any
other work necessary to improve, repair or maintain the Drainage System.
(c) A non-exclusive Drainage Easement for the conveyance of any storm
and surface water originating from within or without the boundaries of the
Development through the Drainage System, at such rates and in such
amounts as may occur from time to time.
(d) This Drainage Easement includes a non -exclusive and partial
assignment of any and all easement rights for drainage held b y the
Association under the Covenants or any other recorded declaration of
covenants and restrictions, recorded easements or otherwise, over property
that the Association does not own within the Development and upon which
any part of the Drainage System lies or passes on, across, under or through;
provided however, that the Town shall provide timely written notification to
the Association of any potentially disruptive improvements and/or
modifications to the systems conveying storm and surface water originating
Page 122 of 218
Revised on 03-28-2024
Page 5 of 9
without the boundaries of the Development and through the Development
Drainage System.
3. This Access, Drainage and Maintenance Easement is granted and accepted subject
to the following:
(a) The Town agrees that the use of the easements granted herein shall
be restricted to the hours of 7:00 o’clock, A.M., to 5:00 o’clock, P.M.,
Monday through Friday excluding public holidays, except in the event of an
Emergency.
(b) Other than in the case of an Emergency, the Town an d the
Association shall determine the scheduling of any work to be performed
hereunder, on its or their property, in advance of the commencement of the
work.
(c) This Access, Drainage and Maintenance Easement is conveyed
subject to all other easements, licenses, and conveyances of record and is
subject to the rights herein reserved by the Association, their successors and
assigns, to utilize their property at any time, in any manner, and for any
purpose, provided, however, that such use by the Association shall not be
inconsistent with nor prevent the full utilization by the Town of the rights
and privileges granted herein.
(d) The Town agrees to plan, lay out, and execute or build
improvements, make repairs, and otherwise maintain the Drainage System,
and further agrees that the Town’s exercise of the rights granted in this
Access, Drainage and Maintenance Easement shall be under the exclusive
Page 123 of 218
Revised on 03-28-2024
Page 6 of 9
control of the Town and that the Town shall at all times comply with all
applicable laws, rules, codes, and regulations.
(e) The Association shall not erect any Permanent Structure on, under,
over, through and across any pr operty of the Development encumbered by
all or any part of the Drainage System without the Town’s prior written
approval, which approval shall not be unreasonably withheld. The
Association shall not impede, obstruct, or allow to be obstructed, the
natural flow of storm and surface water runoff through the Drainage
System; provided, however, that the Association shall have a continuing
obligation under the Covenants to repair and maintain various
improvements located within the Common Properties (lagoons and lagoon
banks, roads, pathways, utilities, etc.), and this Agreement is not intended
to in any way restrict or limit the Association from taking reasonable actions
to perform said obligations.
(f) The rights conveyed under this Access, Drainage and Maintenance
Easement are limited to the parties and purposes stated herein. This
Access, Drainage and Maintenance Easement conveys no rights of access or
otherwise to the general public.
4. The Association acknowledges that the Town shall have no obligation to perform
or pay for any work to repair, improve or maintain the appearance or appeal of the
lagoons, banks of lagoons, landscaping, drains, canals, or other visible components of the
Drainage System, including, but not limited to, structures, bridges, bulkheads, pipes,
culverts, valves, and gates, or include the underground pipe that begins at the southern
Page 124 of 218
Revised on 03-28-2024
Page 7 of 9
shore of the water body known as “ Lake Russell” and extends to the waters of Old House
Creek, or the outfall structure at the end of the underground drainage pipe at Old House
Creek.
5. The Town agrees to cause all work contemplated hereunder to be performed in a
workmanlike fashion with minimal interference to the Grantor, its successors, assigns,
invitees, guests, licensees, and agents. The Town further agrees to cause the work
contemplated hereunder to be completed in an expeditious and timely fashion, and that
all materials, debris, and construction materials shall be promptly removed. The Town
shall restore any other part of the property of the Association which may be damaged as a
result of the Town’s exercise of the rights granted hereunder to its pre-existing state.
6. The Town hereby warrants to the Association that the granting of this A ccess,
Drainage and Maintenance Easement will not affect any “set back” lines with respect to
any property currently owned by the Association.
To have and to hold, all and singular, the rights, privileges, and easements
aforesaid unto the Town of Hilton Head Island, South Carolina, its successors, and
assigns, forever.
In Witness whereof, the parties hereto have caused the within Access, Drainage
and Maintenance Easement to be executed by their duly authorized officers as of this
______ day of _____________, 202__.
Page 125 of 218
Page 126 of 218
Revised on 03-28-2024
Page 9 of 9
WITNESSES: THE TOWN OF HILTON HEAD ISLAND,
SOUTH CAROLINA
By: _____
Alan Perry, Mayor
Attest: ______
Marc Orlando, Town Manager
STATE OF SOUTH CAROLINA ) UNIFORM ACKNOWLEDGMENT
)
COUNTY OF BEAUFORT ) S.C. CODE § 30-5-30 (SUPP. 2010)
I, the undersigned Notary Public do hereby certify that Alan Perry and Marc
Orlando personally appeared before me on this day and duly acknowledged the execution
of the foregoing instrument on behalf of The Town of Hilton Head Island, South Carolina.
Sworn to and Subscribed before me
on this _____Day of ____________, 202__.
Notary Public for South Carolina
My Commission Expires:_________
Page 127 of 218
JO
NE
SVILLE
R
O
A
D
PERCHERON LA NE
W A LK IN G HORSE
STRE
ET
H A C KNEY PONY LANE
PADDOCKS BOULE VARD
W
ELSH PONY
CIRCLE
PADDOCKS
COURT
Exhibit A - The Paddocks
Drainage Easement Agreement Limits ³
0 75 150 225 30037.5
Feet
The information on this map has been compiled from a variety
of sources and is intended to be used only as a guide. It is
provided without any warranty or representation as to the
accuracy or completeness of the data shown. The Town of
Hilton Head Island assumes no liability for its accuracy or
state of completion or for any losses arising from the use of
the map.
Note: Drainage easement widths are 20 feet around pipes
that convey public runoff and 15 feet from the edge of bank
of lagoons that receive public runoff.
Drainage Easement Area Right-of-Way Area Paddocks Limits Drafted on February 15, 2024
Page 128 of 218
JO
NE
SVILLE
R
O
A
D
PERCHERON LA NE
W A LK IN G HORSE
STRE
ET
H A C KNEY PONY LANE
PADDOCKS BOULE VARD
W
ELSH PONY
CIRCLE
PADDOCKS
COURT
Exhibit B
The Paddocks - Development Boundary³
0 75 150 225 30037.5
Feet
The information on this map has been compiled from a variety
of sources and is intended to be used only as a guide. It is
provided without any warranty or representation as to the
accuracy or completeness of the data shown. The Town of
Hilton Head Island assumes no liability for its accuracy or
state of completion or for any losses arising from the use of
the map.
Note: Drainage easement widths are 20 feet around pipes
that convey public runoff and 15 feet from the edge of bank
of lagoons that receive public runoff.
Paddocks Limits Drafted on February 15, 2024
Page 129 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 1 of 33
STATE OF SOUTH CAROLINA )
) DRAINAGE SYSTEM
COUNTY OF BEAUFORT ) MAINTENANCE AGREEMENT
This Drainage System Maintenance Agreement is made this _____ day of
________, 202__, by and between Ribaut Island Property Owners Association , Inc., a
South Carolina nonprofit organization, and the Town of Hilton Head Island, South
Carolina, a body politic, having an address of One Town Center Court, Hilton Head Island,
South Carolina, 29928.
WITNESSETH
WHEREAS, Ribaut Island is a subdivision of land lying and being within the Town
of Hilton Head Island, Beaufort County, South Carolina (hereinafter the “Development”);
and,
WHEREAS, Ribaut Island Property Owners Association , Inc. , is the owner of
improved and unimproved real property and easements within Ribaut Island; and,
WHEREAS, Beaufort County, South Carolina, has adopted Ordinance 99 -101, et
seq., as amended, creating a Storm Water Utility with the power to impose Storm Water
Utility Service Fees on all residents of Beaufort County, South Carolina, and which also
provides that Storm Water Utility Service Fees collected from property owners within the
Town of Hilton Head Island, South Carolina , are returned to it , less administrative fees,
to be used for the purposes set forth in Ordinance 99-101, et seq., as amended; and,
WHEREAS, the imposition and collection of Storm Water Utility Service Fees
results in a fund available for the construction and maintenance of existing and planned
Page 130 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 2 of 33
infrastructure for the collection and conveyance of storm water runoff within the Town of
Hilton Head Island, South Carolina, and,
WHEREAS, Ribaut Island Property Owners Association, Inc., desires for the Town
of Hilton Head Island, South Carolina, to utilize Storm Water Utility Service Fees to
undertake maintenance and improvement of the storm water drainage system in Ribaut
Island, to facilitate the conveyance of storm water runoff within and through the
Development; and,
WHEREAS, the Ribaut Island Property Owners Association , Inc., has agreed to
grant access, drainage, and maintenance easements to the Town, in order to facilitate the
maintenance and improvement of the qualifying storm water drainage system in Ribaut
Island.
Now, therefore , know all men by these presents, that Ribaut Island Property
Owners Association , Inc. , and the Town of Head Island, South Carolina, for and in
consideration of the sum of One and no/100 ($1.00) Dollar, each paid to the other at and
before the execution and delivery of this Agreement, the receipt and sufficiency whereof
is acknowledged, agree as follows:
1. Defined Terms: As used in this Agreement , the following terms as related to
this agreement shall mean:
a. Agreement: This “Drainage System Maintenance Agreement”.
b. Association: Ribaut Island Property Owners Association , Inc. , a
South Carolina not -for-profit corporation with the full authority
under the Covenants to enter into this Agreement and to complete
all of the Association’s obligations under it, and to execute and
Page 131 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 3 of 33
deliver the Access, Drainage and Maintenance Easement attached
hereto as Exhibit “C.”
c. Casualty: The destruction of all or any part of the Drainage S ystem
through a natural disaster.
d. Covenants: Any one or more of Covenants, Conditions, and
Restrictions for Ribaut Island Property Owners Association , Inc.
recorded in the Office of the Register of Deeds for Beaufort County .
South Carolina.
e. Development: Ribaut Island, a planned unit development or
subdivision lying and being on Hilton Head Island, Beaufort County,
South Carolina, which is shown and described on the map attached
as Exhibit “B” hereto.
f. Drainage System: The existing system of lagoons, ditches, canals,
pipes, culverts, catch basins, drains, manholes, junction boxes, weirs,
valves, gates, pumps, structures, related equipment, and related
infrastructure, in the Development lying within the Easement Areas
shown on the map attached hereto as Exhibit “A,” which facilitates
the collection, storage and conveyance of storm and surface water
runoff for public benefit through, within, and from the Development.
For purposes of this Agreement, the Drainage System shall not
include any bridges, docks, retaining walls, road or pathway asphalt,
road or building gutters, underdrains, sub-drains, structural
bulkheads, beaches, tidal banks, estuaries, or salt marshes , or
Page 132 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 4 of 33
driveway pipes, unless the T own, in its sole discretion deems any
particular driveway pipe as critical to the function of the Drainage
System.
g. Emergency: A blockage, structural or mechanical failure, collapse
or other sudden catastrophic event affecting any part of the Drainage
System which prevents or substantially inhibits the flow of storm and
surface water through all or any part of the Drainage System, or
which otherwise results in an imminent peril to life or property.
h. Permanent Structure: Any immovable structure, including, but not
limited to, buildings , sheds, pavilions, walls, masonry structures,
tennis courts, and swimming pools, including swimming pool decks.
i. Pollutant: A nything which causes or contributes to pollution.
Pollutants may include, but are not limited to: paints, varnishes, and
solvents; petroleum hydrocarbons; automotive fluids; cooking
grease; detergents (biodegradable or otherwise); degreasers;
cleaning chemicals; non-hazardous liquid and solid wastes and yard
wastes; sediment; refuse, rubbish, garbage, litter, or other discarded
or abandoned objects and accumulations, so that same may cause or
contribute to pollution; floatables; pesticides, her bicides, and
fertilizers; liquid and solid wastes; sewage, fecal coliform and
pathogens; dissolved and particulate metals; animal wastes; wastes
and residues that result from constructing a building or structure;
concrete and cement; and noxious or offensive matter of any kind.
Page 133 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 5 of 33
j. Post-construction Structural Best Management Practice Facility: A
Post-construction Structural Best Management Practice Facility
(BMPF) is a facility designed and built to provide treatment of storm
water either through storage, filtration or infiltration (i.e. detention
basins, retention basins, rain gardens, bioretention cells, sand filters,
vegetated filter strips, water quality swales and infiltration trenches)
as set forth in the latest editions of the Beaufort County Manual for
Storm Water Best Management and Design Practices, the South
Carolina DHEC Storm Water Management BMP Handbook, and the
Georgia Coastal Stormwater Supplement, which include descriptions
standards, and design guidelines for these facilities.
k. Project: Work, including repairs and improvements performed or
approved by the Town to correct a specific Qualifying Storm
Drainage System Deficiency.
l. Qualifying Drainage System Deficienc y: Anything that, in the
determination of the Town , prevents, impairs or impedes the
adequate conveyance or drainage of storm water runoff through the
Drainage System or the structural failure of a Drainage System
component. Qualifying Drainage System Deficiencies include, but
are not limited to, the following:
i. Lagoon bank erosion that has an appreciable adverse impact
on conveyance of storm water runoff through the Drainage
Page 134 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 6 of 33
System or threatens the integrity of adjacent Drainage System
infrastructure or Permanent Structures;
ii. Presence of sediment and debris located in the Drainage
System that has an appreciable adverse impact on the
conveyance of storm water runoff through the Drainage
System or the functioning of the Drainage System;
iii. Structural deficiencies associated with pipes and culverts,
including, but not limited to, joint failures, deterioration, root
intrusion, or collapse that has an appreciable adverse impact
on conveyance of storm water runoff through the Drainage
System or threatens the integrity of adjacent Drainage System
infrastructure or Permanent Structures;
iv. Structural deficiencies associated with inlets , manholes,
junction boxes , control structures and headwalls including ,
but not limited to, connection failure, deterioration,
mechanical failure, or collapse that has an appreciable
adverse impact on conveyance of storm water runoff through
the Drainage System , or that threatens the integrity of
adjacent infrastructure or Permanent Structures . Examples
of typical deficiencies include damaged grates, grout failures
at pipe connections, deterioration or failure of flap gates and
sluice gates, or failure of structure walls;
Page 135 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 7 of 33
v. Sinkholes caused by Drainage System pipe or Drainage
System structure Deficiencies, but not those caused by the
actions of any third party, including utility providers;
vi. Drainage System conveyance or performance deficiencies due
to inadequate design capacity. Examples of t ypical
conveyance or performance deficiencies include undersized
pipes and insufficient weir capacities.
Qualifying Drainage System Deficiencies do not include the
following:
i. The aesthetic appearance or appeal of any part of the Drainage
System, including but not limited to lagoons, banks of
lagoons, channel banks, landscaping, drains, catch basins,
canals, structures, bridges, bulkheads, pipes, culverts,
valves gates, debris that does not have an appreciable
adverse impact on the conveyance of storm and surface
water through the Drainage System , or other visible
components of the Drainage System;
ii. The introduction of pollution or pollutants into the Drainage
System from any source;
iii. Lagoon bank erosion that does not have an appreciable
adverse impact on conveyance of storm water runoff
through the Drainage System or threaten the integrity of
Page 136 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 8 of 33
adjacent Drainage System infrastructure or Permanent
Structures;
iv. Tidal erosion or tidal flooding that does not have an
appreciable adverse impact on conveyance of storm water
runoff through the Drainage System or threaten the
integrity of Drainage System infrastructure;
v. Establishment of access to the Drainage System by the
Association, including, but not limited to, grading, clearing
of vegetation, removal of trees, or removal of other
obstructions or Permanent Structures in order to provide
physical access to the Drainage System;
vi. Drainage System damage or deficiencies caused by the actions
of others, including utilities and property owners (including,
but not limited to, bores or cuts into pipes or structures);
vii. Minor or nuisance flooding that do es not adversely affect
transportation infrastructure, Permanent Structures ,
hardscape amenities, or conveyance of storm water runoff
through the Drainage System , including golf course
flooding, isolated lawn and yard ponding, or standing water
in roadway shoulders and unimproved lots or land;
viii. Drainage System D eficiencies determined by the T own to be
caused or exacerbated by intentional acts causing tidal
backflow and saltwater intrusion into the Drainage System
Page 137 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 9 of 33
through failure to operate control structures per the design
intent or the failure by the A ssociation to monitor and
maintain proper functioning of backflow prevention devices
including flaps, gates, sluice gates, check valves, or similar
devices;
ix. Damage to, or failure of , Drainage System components
situated underneath or within five (5) feet of any Permanent
Structure that is not a part of the Drainage System, where
the Town determines that difficult access and/or liabilities
exist, or within the zone of influence for the foundation of a
Permanent Structure;
x. The construction of a new drainage system or an addition to
an existing Drainage System, or the modification of an
existing Drainage System to accommodate drainage
requirements for new development within the
Development.
xi. Drainage System deficiencies determined by the Town to be
caused by or originating from unauthorized or non -
permitted modifications to the Drainage System by any
party other than the Town.
m. Storm Water Utility Service Fees: The fees collected by Beaufort
County, South Carolina, under the authority of Beaufort County
Ordinance 99-101, et seq., as amended, and which are remitted by
Page 138 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 10 of 33
Beaufort County, South Carolina, to the T own; or any similar fee,
however denominated, imposed and collected by any subsequent or
successor Storm Water Utility operated by The T own, under the
authority of Town Ordinance Number 2002-43.
n. Storm Water Utility Project Prioritization and Annual Budget
Process: The annual process by which t he Town of Hilton Head
Island, South Carolina, shall establish and maintain a prioritized list
of all known Qualifying Drainage System Deficiencies within the
Town limits determined to be eligible for service using Storm Water
Utility Service Fees. Prior to the beginning of each fiscal year, the
Town shall establish an annual Storm Water Utility budget which
defines all revenues and expenditures associated with the Storm
Water Utility Service Fees. This budget shall include those known
Projects to correct Qualifying Drainage System Deficiencies intended
to be completed within that fiscal year.
o. Town: The Town of Hilton Head Island, South Carolina.
2. Grant of Easements: Contemporaneously with the execution and delivery of
this Agreement , the Association and the T own have entered into an “Access,
Drainage and Maintenance Easement” which grants the Town rights to access,
operate, utilize, maintain, and improve the Drainage System within the
Development, with said easement being in the form attached hereto as Exhibit “C”.
Page 139 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 11 of 33
3. Maintenance, Inspection and Operation of Drainage System: Upon the
execution and delivery of this Agreement and the Access, Drainage and
Maintenance Easement:
(a) the Town shall be responsible for the maintenance, repairs and
improvements necessary to correct any Qualifying Drainage System
Deficiency under the terms and conditions of this Agreement . T his
Agreement does not preclude the Association from repairing, maintaining,
or improving any component of its Drainage System at its expense.
(b) The A ssociation shall be responsible for the following within the
Development:
(i) Normal and emergency o peration of Drainage System control
structures, including gates, weirs, and pumps , and for lowering
water levels in compliance with pre-storm preparation protocols
established by the Town.
(ii) Maintenance and replacement of weir boards , maintenance of
control structure access ways, decking and railings, and maintaining
control structure accessibility for inspection and operation by
controlling and/or removing vegetation as necessary.
(iii) Performing maintenance of work shelves along ditches and canals to
provide reasonable and adequate access for inspection, maintenance
and repair.
(iv) Monitoring the condition of flap gates, sluice gates, check valves, and
similar devices intended to prevent the intrusion of tidal backflow
Page 140 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 12 of 33
and brackish water into the Drainage System to ensure that they are
in proper working order and functioning as intended.
(v) Making repairs to roadway pavement, pathway pavement, curb and
gutter and related ancillary infrastructure or property damage
attributed to a past or existing Qualifying Drainage System
Deficiency if the deficiency has been corrected by the T own via
trenchless technology methods (i.e. pipe lining) . This does not
obligate the A ssociation to repair or replace such infrastructure if
the repair is made using open cut excavations where removal of
surface infrastructure is necessary to complete the repair , in which
case, the repair of the ancillary infrastructure shall be considered to
be a part of the Town’s work to correct the deficiency.
(vi) Performing annual inspections of Post-construction Structural Best
Management Practice Facilities in order to comply with Stormwater
Management Plan obligations, including submittal of inspec tion
documentation to the Town in accordance with § 16-5-109 (H)(2),
Municipal Code to the Town of Hilton Head Island (1983).
(vii) Regulating the actions of utility providers and property owners, or
their assigns, to prevent and mitigate any damage they may cause to
the Drainage System.
4. Procedure for Town’s Maintenance of Drainage System: The Parties
acknowledge that the T own intends to provide for the maintenance and
improvement of the Drainage System and the repair of identifi ed Qualifying
Page 141 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 13 of 33
Drainage System Deficiencies, other than those caused by an Emergency or
Casualty, through the development of its Storm Water Utility Project Prioritization
and Annual Budget Process. Other than in the case of an Emergency or Casualty,
as described in Articles 7, 8 and 10 below, or work completed directly by the
Association under Article 9, the Parties agree:
a. Identifying Qualifying Drainage System Deficiencies: The
Association shall be responsible for i dentifying any Qualifying
Drainage System Deficiencies.
b. Schedule for Submission: The Association shall submit a written
description of each known Qualifying Drainage System Deficiency to
the Town using the service request form provided by the T own,
describing the nature, location and cause (if known) of each
Qualifying Drainage System Deficiency. The Association may
identify a potential solution is for the deficiency. In such case, the
Association shall include a description of the solution and a
preliminary estimate of anticipated costs for the proposed solution .
Qualifying Drainage System Deficiencies that are reported to the
Town, or which are discovered by the T own, by the end of any
calendar year will be considered in the development of the Storm
Water Utility Project Prioritization and Annual Budget Process for
the following fiscal year.
c. Completion of Maintenance: The Town shall annually develop a
Storm Water Utility Project Prioritization and an Annual Budget that
Page 142 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 14 of 33
will address identified Qualifying Drainage System Deficiencies as
follows:
i. The Town shall determine the scope and extent of the
maintenance, repair or improvement that is necessary to
correct any Qualifying Drainage System Deficiencies, and the
means, methods and materials needed to accomplish the
same.
ii. The Town shall d etermine the priority and number of the
Projects and schedule the Projects to correct to correct the
Qualifying Drainage System Deficiencies for each fiscal year.
The determination of the scheduling and funding for the
correction of the Qualifying Drainage System Deficiencies
shall be made by the Town, taking into account the following:
1. The availability and amount of the Storm Water
Utility Service Fees fund balance, revenue from
bonds paid by Storm Water Utility Service Fees,
and Storm Water Utility Service Fees in any given
fiscal year;
2. Prioritization of a ll other Projects, or qualifying
requested improvements, repair and maintenance
that are to be funde d with Storm Water Utility
Service Fees; and
Page 143 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 15 of 33
3. The annual cost required to operate the Storm
Water Utility, its programs and initiatives, and
debt service.
iii. The T own will c omplete the Projects as determined by the
Town as a part of the Storm Water Utility Project
Prioritization and Annual Budget Process , unless
Emergencies or C asualties occur that alter the prioritization
and funding such that funds are insufficient to correct all
Qualifying Drainage System D eficiencies as intended within
the same fiscal year.
d. Scheduling of Projects: Other than in the case of an Emergency or
Casualty, the T own and the A ssociation shall mutually agree in
writing as to the scheduling of any Project to be performed under this
Agreement in the Development in advance of the commencement of
the Project.
e. Resident Notification: The Association shall be solely responsible for
the notification of its owners and guests that may be affected by any
Project, or by work to address any Emergency or Casualty.
f. Legal Access to Private Property : The A ssociation shall be
responsible for o btaining all access rights , including access rights
over and across property in the Development that is not owned by
the Association , as may be deemed necessary by the T own to
complete any Project.
Page 144 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 16 of 33
g. Access Needed to Complete Project : The A ssociation shall be
responsible for providing clear and adequate physical access to each
Project site at no cost to the Town. If clear, adequate physical access
to the Project site cannot be provided sufficient to complete the
Project without the likelihood of damage to property, assets and
amenities by contractors and equipment, the repair and replacement
of any property, assets and amenities damaged as a result of the
Project shall be the responsibility of the Association, at no additional
cost to the Town. Such property, assets and amenities shall include,
but are not limited to, landscaping, flowerbeds, ornamental shrubs
and trees, lawns, irrigation syst ems, boardwalks, cart paths,
driveways, and sidewalks. The determination of whether the access
is clear and adequate , and whether there is a likelihood of damage
shall be made in the sole discretion of the T own, prior to the
commencement of the Project . The A ssociation has the right to
withdraw the service request if the magnitude of potential damage is
not acceptable to the Association . If the service request is
withdrawn, completing the Project shall be the responsibility of the
Association.
h. No Guarantees Regarding Schedule: The Town cannot guarantee
that the amount of available Storm Water Utility Service Fees, the
number of Projects to be funded with Storm Water Utility Service
Fees in any given fiscal year, and whether Emergencies and
Page 145 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 17 of 33
Casualties and weather-related general emergencies will not cause
delays in the correction of Qualifying Drainage System Deficiencies
within the D evelopment and elsewhere. The parties acknowledge
that the Town’s determinations with respect to the priority, funding
and timing of any Project shall be made at the Town’s discretion and
shall be final.
5. Further Obligations of the Association: The Association agrees that during
the term, or any re newal term, of this Agreement, it shall take no action which
damages the Drainage S ystem, allows damage to the Drainage System, or creates
a Drainage System Deficiency, including, but not limited to allowing salt water
intrusion or pollutants to enter the Drainage System and allowing utility providers,
property owners, or their assigns to impair the function of the Drainage System .
To the extent the Association has a continuing obligation under the Covenants to
repair and maintain various improvements located within the Development
including lagoons and lagoon banks, ditch maintenance shelves, roads, pathways,
utilities, this Agreement is not intended to in any way restrict or limit the
Association’s completion of its obligations.
6. Payments as Current Expense of Town: A ny payments to be made by the
Town hereunder shall be made from Storm Water Utility Service Fees as budgeted
for by the Town in any given fiscal year. The Town and the Association intend that
the payment obligations of the Town shall constitute a current expense of the Town
and shall not in any way be construed to be a debt of the Town in contravention of
any applicable constitutional or statutory limitations concerning indebtedness of
Page 146 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 18 of 33
the Town, nor shall anything contained herein constitute a pledge of general tax
revenues, funds, money, or credit of the Town.
7. Emergency: The Parties agree that in the event of an Emergency, the following
procedure shall apply:
a. Agreement Not Terminated : This Agreement shall remain in full
force and effect.
b. Responsibilities of the Association: The Association shall take such
steps as may be reasonably necessary to secure any area affected by
the Emergency. The Association shall notify the Town as soon as is
practical after discovery of the Emergency. The Association may
complete any repairs to the Drainage System needed to address the
Emergency, as provided for in Article 10, below.
c. Responsibilities of the Town: Upon receipt of notification of an
Emergency from the Association, the Town shall determine the scope
and extent of the work that is necessary to repair or correct the
damage caused by the Emergency, and the means, methods and
materials needed to accomplish the same. The Town shall correct or
repair the damage caused by the Emergency as soon as practical,
taking into account the threat presented by the Emergency, the
existence of any other Emergency or Casualty , the cause of the
Emergency and/or the existence of any general emergency affecting
the Town and availability of funding . The T own may seek
reimbursement from third parties for any costs incurred by the Town
Page 147 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 19 of 33
as a result of any Emergency found to have been caused by the
negligence of said third parties.
8. Casualty: The Parties agree that in the event of a Casualty, the following
procedure shall apply:
a. Agreement Not Terminated : This Agreement shall remain in full
force and effect.
b. Design of Drainage System: The Town shall produce engineering
and design plans at its expense for the reconstruction of all or any
part of the Drainage System affected by the Casualty.
c. Approval of Plans: The engineering and design plans must be
approved b y the Association prior to any reconstruction of the
Drainage System . If the A ssociation does not approve the
engineering and design plans prepared by the Town, the Association
may reconstruct the Drainage System at its own expense and shall
not seek reimbursement for the cost thereof from the Town.
d. Right of Entry and Access: If the engineering and design plans
approved by the Association require work outside of easement limits
described in the Access, Drainage and Maintenance Easement , the
Association shall provide temporary easements for access and
construction over any property it owns or controls and shall deliver
a valid temporary construction easement for access and construction
from the owners of property that the Association does not own.
Page 148 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 20 of 33
e. Amendment of Access, Drainage and Maintenance Easement : In
the event that the engineering and design plans approved by the
Association include permanent improvements or create access or
other needs that are in areas not included in the Access, Drainage
and Maintenance Easement , the Association agrees that it will
execute and deliver an amendment to the Access, Drainage and
Maintenance Easement to subject any such areas in the Access,
Drainage and Maintenance Easement.
f. Reconstruction of Drainage System: Following the approval of the
engineering and design plans and specifications by the Association,
the Association’s delivery of any needed temporary easements for
access and construction, the Town shall complete the reconstruction
of the Drainage System , or any part of it, as soon as is practical,
taking into account the threat presented by the cause of the Casualty,
the existence of any general emergency affecting the T own, the
existence of other Emergencies and Casualties and availability of
funding. Other than the expenses identified in subsection (b) of this
Article 8, the Town may seek reimbursement for any costs incurred
by the T own as a result of any Casualty from Storm Water Utility
Service Fees, bond, any government aid and assistance programs, or
the Association, if the A ssociation is responsible for all or any part
of the Casualty.
Page 149 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 21 of 33
9. Maintenance of Drainage System by the Association: Nothing herein shall
prohibit the Association from performing any Project in advance of the time that
any such Project is scheduled as a part of the Town’s Storm Water Utility Project
Prioritization and Annual Budget Process , if the Association determines that it is
in its interest to do so. Other than in the case of an Emergency (addressed in Article
10, below), or a Casualty (addressed in Article 8, above), the Association shall be
entitled to reimbursement, in an amount up to the amount budgeted by the Town
for the Project but not exceeding the actual cost to the Association , from Storm
Water Utility Service Fees , in the fiscal year that such Project is scheduled to be
done as a part of Town’s Storm Water Utility Project Prioritization and Annual
Budget Process, as follows;
a. The Association shall submit its plans, quantities, and specifications
for any Project to the Town.
b. The Town shall grant its written approval to the Association to
complete the Project unless it determines that:
i. The plan and work proposed by the Association will not
correct the existing Qualifying Drainage System
Deficiency; or,
ii. The scope of the p roposed work exceeds what is
necessary to correct the existing Qualifying Drainage
System Deficiency,
c. Upon receipt of the Town ’s written a pproval, the Association shall
bid the work in accordance with the Town’s Procurement Code, § 11-
Page 150 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 22 of 33
1-111, Municipal Code of The Town of Hilton Head Island, South
Carolina (1983), as the same may be amended from time to time.
d. Any changes in the approved scope of work for the Project resulting
in additional work or cost to the T own must be approved in writing
by the Town prior to commencement of any additional work.
e. The Association shall notify the Town at least seventy-two (72) hours
prior to the commencement of work on the Project and at any key
junctures of the work where the Town may need to inspect the work.
f. Upon completion of the Project, the Town shall inspect the Project
and provide the Association written approval or rejection of the
Project.
g. If the Project is approved by the Town, the Association shall submit
to the T own its request for reimbursement , which shall include full
documentation of the bid and procurement of the work to complete
the Project , the contract for the work to complete the Project , the
construction plans, details and as -built surveys or drawings,
measurements, dated inspection reports, photographs of the work in
progress, documentation of the payments made by the Association ,
any required test reports and the Association’s written certification
that the Project was completed in accordance with the approved
plans and specifications.
h. The Town shall thereafter budget funds for reimbursement to the
Association from Storm Water Utility Service Fees in the fiscal year
Page 151 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 23 of 33
that the Project would have otherwise been scheduled in the Town’s
Storm Water Utility Project Prioritization and Annual Budget
Process. The schedule for reimbursement shall depend upon the
Project ranking when compared to all other Projects as determined
in the Town’s Storm Water Utility Project Prioritization and Annual
Budget Process and may be moved forward into a future budget year
as a result. The Association acknowledges that the Town has no
obligation to reimburse the Association for any Project in the fiscal
year following the Association’s completion of the Project, or in any
other particular fiscal year.
10. Emergency Work by the Association: If for any reason, the Town is
unable to repair or correct the damage caused by an Emergency in a time frame
that is acceptable to the Association, the following shall apply:
a. The Association shall consult with the Town to determine a cost -
efficient scope and extent of work necessary to repair or correct the
damage caused by the Emergency, and the means, methods and
materials needed to accomplish the same. The TOWN must approve
in writing, the scope and plans for the work and procurement of
construction services, prior to the commencement of work. The
Association is not required to bid the work but i f the Association
chooses to bid the work, t he A ssociation shall bid the work in
accordance with the Town’s Procurement Code, § 11-1-111, Municipal
Page 152 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 24 of 33
Code of The Town of Hilton Head Island, South Carolina (1983), as
the same may be amended from time to time.
b. The Association shall complete the work that is necessary to repair
or correct the damage caused by the Emergency.
c. The A ssociation shall, whenever possible, notify the Town at least
seventy-two (72) hours prior to the commencement of work and at
any key junctures of the work whereas the Town may need to inspect
the work.
d. Upon completion of the work that has been authorized and approved
by the Town, the Association shall submit to the Town a request for
reimbursement, which shall include full documentation of the bid
and procurement documents for the work, the contract for the work,
construction plans, details and as -built surveys or drawings,
measurements, dated inspection reports , photographs of the work
done and documentation of the payments made, any required test
reports and the Association’s written certification that the work was
completed in accordance with the approved plans and specifications
and state the date the work was completed.
e. The Town shall approve the Association’s request for reimbursement
unless it determines that t he requested reimbursement includes
work other than the work authorized and approved by the Town.
Page 153 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 25 of 33
f. Within three (3) fiscal years following the T own’s approval of the
Association’s request for reimbursement, the Town shall reimburse
the Association in the amount approved.
g. Requests for reimbursement by the Association be submitted to the
Town within three years following the completion of the work by the
Association. The failure to submit the request for reimbursement to
the Town within three years following completion of the Work shall
bar any reimbursement for the work.
11. No Guarantees Regarding Flooding: The Association acknowledges that the
Town’s performance of its obligations under this Agreement does not guarantee or
insure that property within the D evelopment will be free of events of flooding or
erosion, and that the T own does not represent or warrant t o the Association that
the performance of the T own’s obligations under this Agreement will operate to
prevent events of flooding or erosion within the Development.
12. Waiver of Storm Water Service Fee Credit: Upon the execution and delivery
of this Agreement, and for and during the term or any extensions hereof , the
Association acknowledges it shall not be entitled to receive and hereby waives any
Storm Water Service Fee Credit from Beaufort County or the Town with respect to
any real property located within the limits of the Development, for and during the
term of this Agreement or any renewal of this Agreement.
13. Term: This Agreement shall rema in in place f or ten years f rom the date of
execution and shall renew automatically for successive two (2) year terms
beginning July 1 each year thereafter , unless either Party notifies the other, in
Page 154 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 26 of 33
writing, of its intention to terminate this Agreement. Any such notice shall be
delivered not less than two hundred and seventy (270) days prior to the end of the
Town fiscal year (June 30) at the end of the then-current term in which such Party
wishes to terminate the Agreement. Upon delivery of such notice, this Agreement
shall terminate at midnight on J une 30th of the fiscal year in which the notice is
delivered (for example, if notice is given February 1, 2020, the Agreement would
terminate on June 30, 2021). The parties shall thereafter execute and deliver such
documents as may be necessary to cancel the Access, Drainage and Maintenance
Easement delivered pursuant to this Agreement.
a. Superseding Legislation: In the event that the South Carolina General
Assembly enacts legislation prohibiting the ability of local governments to
impose and collect Storm Water Service Fees , then this Agreement shall
terminate.
14. Representation and Warranties of the Association:
The Association represents and warrants:
a. That any and all necessary approvals and/or resolutions have been
obtained, that it has the full authority to execute, deliver and perform
this Agreement and to execute and deliver the Access, Drainage and
Maintenance Easement to be delivered pursuant to this Agreement,
and that the individual(s) executing such documents have full power
and authority to bind the Association to the same.
b. That it is not now a party to any litigation affecting the property
burdened by the easements herein which could impair the
Page 155 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 27 of 33
obligations of the Association under this Agreement or the Access,
Drainage and Maintenance Easement, and the Association knows of
no litigation or threatened litigation affecting their ability to grant
said easements.
c. That as to any pipes or other portions of the Drainage System as
shown on Exhibit “A” hereto which are located in whole or in part on
private residential lots, the Association has full authority under the
Covenants to convey or assign to the Town the rights contemplated
in this Agreement and the Access, Drainage and Maintenance
Easement.
15. Town Representation and Warranties:
The Town represents and warrants to the Association:
a. As is shown by the Resolution of the TOWN that is attached hereto
as Exhibit “ D”, the Town represents that it has the power and
authority to enter into this Agreement and complete its obligations
hereunder; and,
b. That it is not now a party to any litigation which could impair the
obligations of the Town under this Agreement, and the Town knows
of no litigation or threatened litigation affecting its ability to perform
hereunder.
16. Taxes: The A ssociation shall ensure payment, prior to delinquency, all taxes on
Association properties within the D evelopment burdened by the easements
granted under this Agreement.
Page 156 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 28 of 33
17. Default: The Town and the Association agree that in the event of a default or
breach of any provision or term of this Agreement, the non- defaulting party or
parties shall give written notice to the defaulting party or parties of the default or
breach. In the event that the defaulting party or parties fail to cure the default or
breach within thirty (30) days of the date of the written notice specifying the
default or breach, unless a non-monetary default or breach cannot reasonably be
cured within said thirty (30) day time period, then said period shall be reasonably
extended, up to one hundred and twenty (120) days, then the non-defaulting party
or parties shall be entitled to pursue any remedy at law or in equity against the
defaulting party or parties, including but not limited to an action for damages,
injunction or specific performance of this Agreement.
18. Attorney’s Fees: If any legal action or other proceeding is brought for the
enforcement of this Agreement, or because of a dispute, breach, default or
misrepresentation in connection with any of the provisions or terms of this
Agreement, the prevailing party or parties sh all be entitled to seek recovery of its
or their reasonable attorney’s fees and any costs incurred as a result of any such
action or proceeding, whether incurred before the commencement of suit or after
the commencement of suit, and including appellate proceedings, in addition to any
other relief to which the prevailing party or parties is or are entitled.
19. General Provisions:
a. Binding Effect: This Agreement shall inure to the benefit of and be
binding upo n the Association and the T own, and their respective
successors and assigns.
Page 157 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 29 of 33
b. Amendment, Changes and Modifications: Except as is otherwise
provided herein, this Agreement may not be modified, amended,
changed, or altered without the written consent of the TOWN and the
Association.
c. Severability: In the event that any term or provision of this
Agreement shall be held to be invalid or unenforceable by any court
of competent jurisdiction, such holding shall not invalidate or render
unenforceable any other term or provision hereof.
d. Execution in Counterparts: This Agreement may be simultaneously
executed in several counterparts, each of which shall be an original,
and all of which shall constitute one and the same instrument.
e. Applicable Law: This Agreement shall be governed by and construed
in accordance with the laws of the State of South Carolina.
f. Captions: The captions or headings used herein are for convenience
only and in no way define, limit, expand or describe the scope or
intent of any term or provision of this Agreement.
g. Plural/Singular: Where appropriate, the use of the singular herein
shall be deemed to include the plural, and the use of the plural herein
shall be deemed to include the use of the singular.
h. No Third-Party Beneficiaries: The Town and the Association
affirmatively represent that this Agreement is made solely for the
benefit of the Parties hereto and their respective successor s and
assigns and not for the benefit of any third party who is not a
Page 158 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 30 of 33
signature party hereto. It is the express intent of the T own and the
Association that no other party shall have any enforceable rights
hereunder, or any right to the enforcement hereof, or to any claim for
damages as a result of any alleged breach hereof.
i. Notices: All notices, applications, requests, certificates, or other
communications required hereunder shall be sufficiently given and
shall be deemed given on the date when such is delivered in person,
or deposited in the United States Mail, by regular first -class mail,
postage prepaid, at the following addresses, or at such other address
as may be designated, in writing, by the Parties:
To the Town: The Town of Hilton Head Island, SC
Attn: Marc Orlando, Town Manager
One Town Center Court
Hilton Head Island, SC 29928
To the Association: Ribaut Island Property Owners
Association, Inc.
PO Box 23094
Hilton Head Island, SC 29925
j. No Waiver: No failure of any Party hereto to exercise any power or
right given to such Party hereunder, or to insist on strict compliance
by any other Party of its obligations hereunder, and no custom or
practice of the Parties at variance with the terms and provisions
hereof shall constitute a waiver of any Party’s right to thereafter
demand strict compliance with the terms of this Agreement.
Page 159 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 31 of 33
k. Further Assurances and Corrective Documents: The TOWN and the
Association agree to do, execute, acknowledge, deliver or cause to be
done all such further acts as may be reasonably determined to be
necessary to carry out this Agreement and give effect to the terms
and provisions hereof. The Town and the Association agree that each
shall, upon request, execute and deliver such other or further or
corrective documents as may be reasonably determined to be
necessary to carry out this Agreement and each of the terms and
provisions hereof.
In Witness Whereof, The Town of Hilton Head Island, South Carolina; and Ribaut
Island Property Owners Association, Inc., by and through their duly authorized officers,
have executed and delivered this Agreement as of this ___ day of ______________,
202__.
SIGNATURES BEGIN ON NEXT PAGE
Page 160 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 32 of 33
WITNESSES: Ribaut Island Property Owners Association, Inc.
By:
Its: _____________________
Attest:
Its: _____________________
THE TOWN OF HILTON HEAD ISLAND,
SOUTH CAROLINA
By:
Alan Perry, Mayor
Attest:
Marc Orlando, Town Manager
Page 161 of 218
Standard Language Adopted on 11-04-2020
Revised on 03-19-2024
Page 33 of 33
List of Exhibits
Exhibit A Map depicting the limits of the Access, Drainage and Maintenance
Easement areas and Drainage Systems covered by this Agreement
Exhibit B Map depicting the Development covered by this Agreement
Exhibit C Access, Drainage and Maintenance Easement
Exhibit D Town Resolution authorizing this Agreement
Page 162 of 218
Revised on 03-15-2024
Page 1 of 9
STATE OF SOUTH CAROLINA ) ACCESS, DRAINAGE AND
) MAINTENANCE EASEMENT
COUNTY OF BEAUFORT )
Know all men by these presents, that Ribaut Island Property Owners Association , Inc.
and the Town of Hilton Head Island, South Carolina, One Town Center Court, Hilton
Head Island, SC, 29928, for and in consideration of the sum of One and No/100 ($1.00)
Dollar, each paid to the other at and before the execution and delivery of this Access,
Drainage and Maintenance Easement, the receipt and sufficiency whereof is
acknowledged, agree as follows:
1. Defined Terms: As used herein, the following terms shall mean:
(a) Association: Ribaut Island Property Owners Association , Inc. , a
South Carolina not -for-profit corporation with the full authority
under the Covenants to enter into this Agreement.
(b) Covenants: Any one or more of Covenants, Conditions, and
Restrictions for Ribaut Island Property Owners Association , Inc.
recorded in the Office of the Register of Deeds for Beaufort County.
South Carolina.
(c) Development: Ribaut Island, a planned unit development or
subdivision lying and being on Hilton Head Island, Beaufort County,
South Carolina, which is shown and described on the map attached
as Exhibit “B” hereto.
Page 163 of 218
Revised on 03-15-2024
Page 2 of 9
(d) Drainage System: The existing system of lagoons, ditches, canals,
pipes, culverts, catch basins, drains, manholes, junction boxes, weirs,
valves, gates, pumps, structures, related equipment, and related
infrastructure, in the Development lying within the Easement Areas
shown on the map attached hereto as Exhibit “A ,” which facilitates
the collection, storage and conveyance of storm and surface water
runoff for public benefit through, within, and from the Development.
For purposes of this Agreement, the Drainage System shall not
include any bridges, docks, retaining walls, road or pathway asphalt,
road or building gutters, underdrains, sub -drains, structural
bulkheads, beaches, tidal banks, estuaries, or salt marshes, or
driveway pipes, unless the Town, in its sole discretion deems any
particular driveway pipe as critical to the function of the Drainage
System.
(e) Emergency: A blockage, structural or mechanical failure, collapse or
other sudden catastrophic event affecting any part of the Drainage
System which prevents or substantially inhibits the flow of storm and
surface water through all or any part of the Drainage System, or
which otherwise results in an imminent peril to life or property.
(f) Permanent Structure: Any immovable structure, including, but not
limited to, buildings , sheds, pavilions, walls, masonry structures,
tennis courts, and swimming pools, including swimming pool decks.
(g) Town: The Town of Hilton Head Island, South Carolina.
Page 164 of 218
Revised on 03-15-2024
Page 3 of 9
2. Grant of Easements: The Association does hereby grant, transfer, sell and convey
to the Town, and its agents, assigns, employees and contractors, and their vehicles,
machinery, and equipment, and create and establish for the benefit of the Town, the
following easements:
(a) A non-exclusive Access Easement on, over and across any roads and
streets within the Development , and on, over and across any property
owned b y the Association encumbered by all or any part of the Drainage
System. This Access Easement includes a non -exclusive and partial
assignment of any and all easement rights for access held by the
Association, under the Covenants or any other declaration of covenants and
restrictions, recorded easements or otherwise, over property that the
Association does not own within the Development and upon which any part
of the Drainage System lies or passes on, across, under or through.
(b) A non-exclusive Maintenance Easement on, under, over, through and
across any property of the Development , encumbered by all or any part of
the Drainage System. This Maintenance Easement includes a non -exclusive
and partial assignment of any and all easement rights for maintenance,
construction, or ot herwise, held by the Association under the Covenants or
any other declaration of covenants and restrictions, recorded easements or
otherwise, over property that the Association does not own within the
Development and upon which any part of the Drainage System lies or
passes on, across, under or through. This Maintenance Easement shall
include all facilities or structures directly related to the collection, storage
Page 165 of 218
Revised on 03-15-2024
Page 4 of 9
and conveyance of storm and surface water now or hereafter existing within
the Development , and sufficient property beside or over any part of the
Drainage System as shown on Exhibit “A” to allow for excavation and any
other work necessary to improve, repair or maintain the Drainage System.
(c) A non-exclusive Drainage Easement for the conveyance of any storm
and surface water originating from within or without the boundaries of the
Development through the Drainage System, at such rates and in such
amounts as may occur from time to time.
(d) This Drainage Easement includes a non -exclusive and partial
assignment of any and all easement rights for drainage held b y the
Association under the Covenants or any other recorded declaration of
covenants and restrictions, recorded easements or otherwise, over property
that the Association does not own within the Development and upon which
any part of the Drainage System lies or passes on, across, under or through;
provided however, that the Town shall provide timely written notification to
the Association of any potentially disruptive improvements and/or
modifications to the systems conveying storm and surface water originating
without the boundaries of the Development and through the Development
Drainage System.
3. This Access, Drainage and Maintenance Easement is granted and accepted subject
to the following:
(a) The Town agrees that the use of the easements granted herein shall
be restricted to the hours of 7:00 o’clock, A.M., to 5:00 o’clock, P.M.,
Page 166 of 218
Revised on 03-15-2024
Page 5 of 9
Monday through Friday excluding public holidays, except in the event of an
Emergency.
(b) Other than in the case of an Emergency, the Town an d the
Association shall determine the scheduling of any work to be performed
hereunder, on its or their property, in advance of the commencement of the
work.
(c) This Access, Drainage and Maintenance Easement is conveyed
subject to all other easements, licenses, and conveyances of record and is
subject to the rights herein reserved by the Association, their successors and
assigns, to utilize their property at any time, in any manner, and for any
purpose, provided, however, that such use by the Association shall not be
inconsistent with nor prevent the full utilization by the Town of the rights
and privileges granted herein.
(d) The Town agrees to plan, lay out, and execute or build
improvements, make repairs, and otherwise maintain the Drainage System,
and further agrees that the Town’s exercise of the rights granted in this
Access, Drainage and Maintenance Easement shall be under the exclusive
control of the Town and that the Town shall at all times comply with all
applicable laws, rules, codes, and regulations.
(e) The Association shall not erect any Permanent Structure on, under,
over, through and across any pr operty of the Development encumbered by
all or any part of the Drainage System without the Town’s prior written
approval, which approval shall not be unreasonably withheld. The
Page 167 of 218
Revised on 03-15-2024
Page 6 of 9
Association shall not impede, obstruct, or allow to be obstructed, the
natural flow of storm and surface water runoff through the Drainage
System; provided, however, that the Association shall have a continuing
obligation under the Covenants to repair and maintain various
improvements located within the Common Properties (lagoons and lagoon
banks, roads, pathways, utilities, etc.), and this Agreement is not intended
to in any way restrict or limit the Association from taking reasonable actions
to perform said obligations.
(f) The rights conveyed under this Access, Drainage and Maintenance
Easement are limited to the parties and purposes stated herein. This
Access, Drainage and Maintenance Easement conveys no rights of access or
otherwise to the general public.
4. The Association acknowledges that the Town shall have no obligation to perform
or pay for any work to repair, improve or maintain the appearance or appeal of the
lagoons, banks of lagoons, landscaping, drains, canals, or other visible components of the
Drainage System, including, but not limited to, structures, bridges, bulkheads, pipes,
culverts, valves, and gates.
5. The Town agrees to cause all work contemplated hereunder to be performed in a
workmanlike fashion with minimal interference to the Grantor, its successors, assigns,
invitees, guests, licensees, and agents. The Town further agrees to cause the work
contemplated hereunder to be completed in an expeditious and timely fashion, and that
all materials, debris, and construction materials shall be promptly removed. The Town
shall restore any other part of the property of the Association which may be damaged as a
Page 168 of 218
Revised on 03-15-2024
Page 7 of 9
result of the Town’s exercise of the rights granted hereunder to its pre-existing state.
6. The Town hereby warrants to the Association that the granting of this A ccess,
Drainage and Maintenance Easement will not affect any “set back” lines with respect to
any property currently owned by the Association.
To have and to hold, all and singular, the rights, privileges, and easements
aforesaid unto the Town of Hilton Head Island, South Carolina, its successors, and
assigns, forever.
In Witness whereof, the parties hereto have caused the within Access, Drainage
and Maintenance Easement to be executed by their duly authorized officers as of this
______ day of _____________, 202__.
Page 169 of 218
Revised on 03-15-2024
Page 8 of 9
WITNESSES: Ribaut Island Property Owners Association, Inc.
By:
Attest:
STATE OF SOUTH CAROLINA ) UNIFORM ACKNOWLEDGMENT
)
COUNTY OF BEAUFORT ) S.C. CODE § 30-5-30 (SUPP. 2010)
I, the undersigned Notary Public do hereby certify that __________________
personally appeared before me on this day and duly acknowledged the execution of the
foregoing instrument on behalf of Ribaut Island Property Owners Association, Inc..
Sworn to and Subscribed before me
on this Day of ____________, 202__.
Notary Public for South Carolina
My Commission Expires:______________
Page 170 of 218
Revised on 03-15-2024
Page 9 of 9
WITNESSES: THE TOWN OF HILTON HEAD ISLAND,
SOUTH CAROLINA
By: _____
Alan Perry, Mayor
Attest: ______
Marc Orlando, Town Manager
STATE OF SOUTH CAROLINA ) UNIFORM ACKNOWLEDGMENT
)
COUNTY OF BEAUFORT ) S.C. CODE § 30-5-30 (SUPP. 2010)
I, the undersigned Notary Public do hereby certify that Alan Perry and Marc
Orlando personally appeared before me on this day and duly acknowledged the execution
of the foregoing instrument on behalf of The Town of Hilton Head Island, South Carolina.
Sworn to and Subscribed before me
on this _____Day of ____________, 202__.
Notary Public for South Carolina
My Commission Expires:_________
Page 171 of 218
SEABROOK
DRIVE
CHARLE S FORT P LA CE
LADSONCOURT
B AYLEY POINT LANE
RIBAUT DRIVE
Exhibit A - Ribaut Island
Drainage Easement Agreement Limits ³
0 100 200 300 40050
Feet
The information on this map has been compiled from a variety
of sources and is intended to be used only as a guide. It is
provided without any warranty or representation as to the
accuracy or completeness of the data shown. The Town of
Hilton Head Island assumes no liability for its accuracy or
state of completion or for any losses arising from the use of
the map.
Note: Drainage easement widths are 20 feet around pipes
that convey public runoff and 15 feet from the edge of bank
of lagoons that receive public runoff.
Drainage Easement Area Right-of-Way Area Ribaut Island Limits Drafted on February 15, 2024
Page 172 of 218
SEABROOK
DRIVE
CHARLE S FORT P LA CE
LADSONCOURT
B AYLEY POINT LANE
RIBAUT DRIVE
Exhibit B
Ribaut Island - Development Boundary ³
0 100 200 300 40050
Feet
The information on this map has been compiled from a variety
of sources and is intended to be used only as a guide. It is
provided without any warranty or representation as to the
accuracy or completeness of the data shown. The Town of
Hilton Head Island assumes no liability for its accuracy or
state of completion or for any losses arising from the use of
the map.
Note: Drainage easement widths are 20 feet around pipes
that convey public runoff and 15 feet from the edge of bank
of lagoons that receive public runoff.
Ribaut Island Limits Drafted on February 15, 2024
Page 173 of 218
Standard Language Adopted on 11-04-2020
Page 1 of 33
STATE OF SOUTH CAROLINA )
) DRAINAGE SYSTEM
COUNTY OF BEAUFORT ) MAINTENANCE AGREEMENT
This Drainage System Maintenance Agreement is made this _____ day of
________, 202__, by and between Victoria Square Property Owners’ Association, Inc.,
a South Carolina nonprofit organization, and the Town of Hilton Head Island, South
Carolina, a body politic, having an address of One Town Center Court, Hilton Head Island,
South Carolina, 29928.
WITNESSETH
WHEREAS, Victoria Square is a subdivision of land lying and being within the
Town of Hilton Head Island , Beaufort County, South Carolina (hereinafter the
“Development”); and,
WHEREAS, Victoria Square Property Owners’ Association , Inc., is the owner of
improved and unimproved real property and easements within Victoria Square; and,
WHEREAS, Beaufort County, South Carolina, has adopted Ordinance 99 -101, et
seq., as amended, creating a Storm Water Utility with the power to impose Storm Water
Utility Service Fees on all residents of Beaufort County, South Carolina, and which also
provides that Storm Water Utility Service Fees collected from property owners within the
Town of Hilton Head Island, South Carolina , are returned to it , less administrative fees,
to be used for the purposes set forth in Ordinance 99-101, et seq., as amended; and,
WHEREAS, the imposition and collection of Storm Water Utility Service Fees
results in a fund available for the construction and maintenance of existing and planned
Page 174 of 218
Standard Language Adopted on 11-04-2020
Page 2 of 33
infrastructure for the collection and conveyance of storm water runoff within the Town of
Hilton Head Island, South Carolina, and,
WHEREAS, Victoria Square Property Owners’ Association , Inc ., desires for the
Town of Hilton Head Island, South Carolina, to utilize Storm Water Utility Service Fees
to undertake maintenance and improvement of the storm water drainage system in
Victoria Square, to facilitate the conveyance of storm water runoff within and through the
Development; and,
WHEREAS, the Victoria Square Property Owners’ Association, Inc., has agreed to
grant access, drainage, and maintenance easements to the Town, in order to facilitate the
maintenance and improvement of the qualifying storm water drainage system in Victoria
Square.
Now, therefore , know all men by these presents, that Victoria Square Property
Owners’ Association , Inc ., and the Town of Head Island, South Carolina, for and in
consideration of the sum of One and no/100 ($1.00) Dollar, each paid to the other at and
before the execution and delivery of this Agreement, the receipt and sufficiency whereof
is acknowledged, agree as follows:
1. Defined Terms: As used in this Agreement , the following terms as related to
this agreement shall mean:
a. Agreement: This “Drainage System Maintenance Agreement”.
b. Association: Victoria Square Property Owners’ Association , Inc., a
South Carolina not -for-profit corporation with the full authority
under the Covenants to enter into this Agreement and to complete
all of the Association’s obligations under it, and to execute and
Page 175 of 218
Standard Language Adopted on 11-04-2020
Page 3 of 33
deliver the Access, Drainage and Maintenance Easement attached
hereto as Exhibit “C.”
c. Casualty: The destruction of all or any part of the Drainage S ystem
through a natural disaster.
d. Covenants: Any one or more of Covenants, Conditions, and
Restrictions for Victoria Square Property Owners’ Association , Inc.
recorded in the Office of the Register of Deeds for Beaufort County .
South Carolina.
e. Development: Victoria Square , a planned unit development or
subdivision lying and being on Hilton Head Island, Beaufort County,
South Carolina, which is shown and described on the map attached
as Exhibit “B” hereto.
f. Drainage System: The existing system of lagoons, ditches, canals,
pipes, culverts, catch basins, drains, manholes, junction boxes, weirs,
valves, gates, pumps, structures, related equipment and related
infrastructure, in the Development lying within the Easement Areas
shown on the map attached hereto as Exhibit “A,” which facilitates
the collection, storage and conveyance of storm and surface water
runoff for public benefit through, within, and from the Development.
For purposes of this Agreement, the Drainage System shall not
include any bridges, docks, retaining walls, road or pathway asphalt,
road or building gutters, underdrains, sub-drains, structural
bulkheads, beaches, tidal banks, estuaries, or salt marshes , or
Page 176 of 218
Standard Language Adopted on 11-04-2020
Page 4 of 33
driveway pipes, unless the T own, in its sole discretion deems any
particular driveway pipe as critical to the function of the Drainage
System.
g. Emergency: A blockage, structural or mechanical failure, collapse
or other sudden catastrophic event affecting any part of the Drainage
System which prevents or substantially inhibits the flow of storm and
surface water through all or any part of the Drainage System, or
which otherwise results in an imminent peril to life or property.
h. Permanent Structure: Any immovable structure, including, but not
limited to, buildings , sheds, pavilions, walls, masonry structures,
tennis courts, and swimming pools, including swimming pool decks.
i. Pollutant: A nything which causes or contributes to pollution.
Pollutants may include, but are not limited to: paints, varnishes, and
solvents; petroleum hydrocarbons; automotive fluids; cooking
grease; detergents (biodegradable or otherwise); degreasers;
cleaning chemicals; non-hazardous liquid and solid wastes and yard
wastes; sediment; refuse, rubbish, garbage, litter, or other discarded
or abandoned objects and accumulations, so that same may cause or
contribute to pollution; floatables; pesticides, her bicides, and
fertilizers; liquid and solid wastes; sewage, fecal coliform and
pathogens; dissolved and particulate metals; animal wastes; wastes
and residues that result from constructing a building or structure;
concrete and cement; and noxious or offensive matter of any kind.
Page 177 of 218
Standard Language Adopted on 11-04-2020
Page 5 of 33
j. Post-construction Structural Best Management Practice Facility: A
Post-construction Structural Best Management Practice Facility
(BMPF) is a facility designed and built to provide treatment of storm
water either through storage, filtration or infiltration (i.e. detention
basins, retention basins, rain gardens, bioretention cells, sand filters,
vegetated filter strips, water quality swales and infiltration trenches)
as set forth in the latest editions of the Beaufort County Manual for
Storm Water Best Management and Design Practices, the South
Carolina DHEC Storm Water Management BMP Handbook, and the
Georgia Coastal Stormwater Supplement, which include descriptions
standards, and design guidelines for these facilities.
k. Project: Work, including repairs and improvements performed or
approved by the Town to correct a specific Qualifying Storm
Drainage System Deficiency.
l. Qualifying Drainage System Deficienc y: Anything that, in the
determination of the Town , prevents, impairs or impedes the
adequate conveyance or drainage of storm water runoff through the
Drainage System or the structural failure of a Drainage System
component. Qualifying Drainage System Deficiencies include, but
are not limited to, the following:
i. Lagoon bank erosion that has an appreciable adverse impact
on conveyance of storm water runoff through the Drainage
Page 178 of 218
Standard Language Adopted on 11-04-2020
Page 6 of 33
System or threatens the integrity of adjacent Drainage System
infrastructure or Permanent Structures;
ii. Presence of sediment and debris located in the Drainage
System that has an appreciable adverse impact on the
conveyance of storm water runoff through the Drainage
System or the functioning of the Drainage System;
iii. Structural deficiencies associated with pipes and culverts,
including, but not limited to, joint failures, deterioration, root
intrusion, or collapse that has an appreciable adverse impact
on conveyance of storm water runoff through the Drainage
System or threatens the integrity of adjacent Drainage System
infrastructure or Permanent Structures;
iv. Structural deficiencies associated with inlets , manholes,
junction boxes , control structures and headwalls including ,
but not limited to, connection failure, deterioration,
mechanical failure, or collapse that has an appreciable
adverse impact on conveyance of storm water runoff through
the Drainage System , or that threatens the integrity of
adjacent infrastructure or Permanent Structures . Examples
of typical deficiencies include damaged grates, grout failures
at pipe connections, deterioration or failure of flap gates and
sluice gates, or failure of structure walls;
Page 179 of 218
Standard Language Adopted on 11-04-2020
Page 7 of 33
v. Sinkholes caused by Drainage System pipe or Drainage
System structure Deficiencies, but not those caused by the
actions of any third party, including utility providers;
vi. Drainage System conveyance or performance deficiencies due
to inadequate design capacity. Examples of t ypical
conveyance or performance deficiencies include undersized
pipes and insufficient weir capacities.
Qualifying Drainage System Deficiencies do not include the
following:
i. The aesthetic appearance or appeal of any part of the Drainage
System, including but not limited to lagoons, banks of
lagoons, channel banks, landscaping, drains, catch basins,
canals, structures, bridges, bulkheads, pipes, culverts,
valves gates, debris that does not have an appreciable
adverse impact on the conveyance of storm and surface
water through the Drainage System , or other visible
components of the Drainage System;
ii. The introduction of pollution or pollutants into the Drainage
System from any source;
iii. Lagoon bank erosion that does not have an appreciable
adverse impact on conveyance of storm water runoff
through the Drainage System or threaten the integrity of
Page 180 of 218
Standard Language Adopted on 11-04-2020
Page 8 of 33
adjacent Drainage System infrastructure or Permanent
Structures;
iv. Tidal erosion or tidal flooding that does not have an
appreciable adverse impact on conveyance of storm water
runoff through the Drainage System or threaten the
integrity of Drainage System infrastructure;
v. Establishment of access to the Drainage System by the
Association, including, but not limited to, grading, clearing
of vegetation, removal of trees, or removal of other
obstructions or Permanent Structures in order to provide
physical access to the Drainage System;
vi. Drainage System damage or deficiencies caused by the actions
of others, including utilities and property owners (including,
but not limited to, bores or cuts into pipes or structures);
vii. Minor or nuisance flooding that do es not adversely affect
transportation infrastructure, Permanent Structures ,
hardscape amenities, or conveyance of storm water runoff
through the Drainage System , including golf course
flooding, isolated lawn and yard ponding, or standing water
in roadway shoulders and unimproved lots or land;
viii. Drainage System D eficiencies determined by the T own to be
caused or exacerbated by intentional acts causing tidal
backflow and saltwater intrusion into the Drainage System
Page 181 of 218
Standard Language Adopted on 11-04-2020
Page 9 of 33
through failure to operate control structures per the design
intent or the failure by the A ssociation to monitor and
maintain proper functioning of backflow prevention devices
including flaps, gates, sluice gates, check valves, or similar
devices;
ix. Damage to, or failure of , Drainage System components
situated underneath or within five (5) feet of any Permanent
Structure that is not a part of the Drainage System, where
the Town determines that difficult access and/or liabilities
exist, or within the zone of influence for the foundation of a
Permanent Structure;
x. The construction of a new drainage system or an addition to
an existing Drainage System, or the modification of an
existing Drainage System to accommodate drainage
requirements for new development within the
Development.
xi. Drainage System deficiencies determined by the Town to be
caused by or originating from unauthorized or non -
permitted modifications to the Drainage System by any
party other than the Town.
m. Storm Water Utility Service Fees: The fees collected by Beaufort
County, South Carolina, under the authority of Beaufort County
Ordinance 99-101, et seq., as amended, and which are remitted by
Page 182 of 218
Standard Language Adopted on 11-04-2020
Page 10 of 33
Beaufort County, South Carolina, to the T own; or any similar fee,
however denominated, imposed and collected by any subsequent or
successor Storm Water Utility operated by The T own, under the
authority of Town Ordinance Number 2002-43.
n. Storm Water Utility Project Prioritization and Annual Budget
Process: The annual process by which t he Town of Hilton Head
Island, South Carolina, shall establish and maintain a prioritized list
of all known Qualifying Drainage System Deficiencies within the
Town limits determined to be eligible for service using Storm Water
Utility Service Fees. Prior to the beginning of each fiscal year, the
Town shall establish an annual Storm Water Utility budget which
defines all revenues and expenditures associated w ith the Storm
Water Utility Service Fees. This budget shall include those known
Projects to correct Qualifying Drainage System Deficiencies intended
to be completed within that fiscal year.
o. Town: The Town of Hilton Head Island, South Carolina.
2. Grant of Easements: Contemporaneously with the execution and delivery of
this Agreement , the Association and the T own have entered into an “Access,
Drainage and Maintenance Easement” which grants the Town rights to access,
operate, utilize, maintain, and improve the Drainage System within the
Development, with said easement being in the form attached hereto as Exhibit “C”.
Page 183 of 218
Standard Language Adopted on 11-04-2020
Page 11 of 33
3. Maintenance, Inspection and Operation of Drainage System: Upon the
execution and delivery of this Agreement and the Access, Drainage and
Maintenance Easement:
(a) the Town shall be responsible for the maintenance, repairs and
improvements necessary to correct any Qualifying Drainage System
Deficiency under the terms and conditions of this Agreement . T his
Agreement does not preclude the Association from repairing, maintaining,
or improving any component of its Drainage System at its expense.
(b) The A ssociation shall be responsible for the following within the
Development:
(i) Normal and emergency o peration of Drainage System control
structures, including gates, weirs and pumps, and for lowering water
levels in compliance with pre-storm preparation protocols
established by the Town.
(ii) Maintenance and replacement of weir boards , maintenance of
control structure access ways, decking and railings, and maintaining
control structure accessibility for inspection and operation by
controlling and/or removing vegetation as necessary.
(iii) Performing maintenance of work shelves along ditches and canals to
provide reasonable and adequate access for inspection, maintenance
and repair.
(iv) Monitoring the condition of flap gates, sluice gates, check valves, and
similar devices intended to prevent the intrusion of tidal backflow
Page 184 of 218
Standard Language Adopted on 11-04-2020
Page 12 of 33
and brackish water into the Drainage System to ensure that they are
in proper working order and functioning as intended.
(v) Making repairs to roadway pavement, pathway pavement, curb and
gutter and related ancillary infrastructure or property damage
attributed to a past or existing Qualifying Drainage System
Deficiency if the deficiency has been corrected by the T own via
trenchless technology methods (i.e. pipe lining) . This does not
obligate the A ssociation to repair or replace such infrastructure if
the repair is made using open cut excavations where removal of
surface infrastructure is necessary to complete the repair , in which
case, the repair of the ancillary infrastructure shall be considered to
be a part of the Town’s work to correct the deficiency.
(vi) Performing annual inspections of Post-construction Structural Best
Management Practice Facilities in order to comply with Stormwater
Management Plan obligations, including submittal of inspec tion
documentation to the Town in accordance with § 16-5-109 (H)(2),
Municipal Code to the Town of Hilton Head Island (1983).
(vii) Regulating the actions of utility providers and property owners, or
their assigns, to prevent and mitigate any damage they may cause to
the Drainage System.
4. Procedure for Town’s Maintenance of Drainage System: The Parties
acknowledge that the T own intends to provide for the maintenance and
improvement of the Drainage System and the repair of identifi ed Qualifying
Page 185 of 218
Standard Language Adopted on 11-04-2020
Page 13 of 33
Drainage System Deficiencies, other than those caused by an Emergency or
Casualty, through the development of its Storm Water Utility Project Prioritization
and Annual Budget Process. Other than in the case of an Emergency or Casualty,
as described in Articles 7, 8 and 10 below, or work completed directly by the
Association under Article 9, the Parties agree:
a. Identifying Qualifying Drainage System Deficiencies: The
Association shall be responsible for i dentifying any Qualifying
Drainage System Deficiencies.
b. Schedule for Submission: The Association shall submit a written
description of each known Qualifying Drainage System Deficiency to
the Town using the service request form provided by the T own,
describing the nature, location and cause (if known) of each
Qualifying Drainage System Deficiency. The Association may
identify a potential solution is for the deficiency. In such case, the
Association shall include a description of the solution and a
preliminary estimate of anticipated costs for the proposed solution .
Qualifying Drainage System Deficiencies that are reported to the
Town, or which are discovered by the T own, by the end of any
calendar year will be considered in the development of the Storm
Water Utility Project Prioritization and Annual Budget Process for
the following fiscal year.
c. Completion of Maintenance: The Town shall annually develop a
Storm Water Utility Project Prioritization and an Annual Budget that
Page 186 of 218
Standard Language Adopted on 11-04-2020
Page 14 of 33
will address identified Qualifying Drainage System Deficiencies as
follows:
i. The Town shall determine the scope and extent of the
maintenance, repair or improvement that is necessary to
correct any Qualifying Drainage System Deficiencies, and the
means, methods and materials needed to accomplish the
same.
ii. The Town shall d etermine the priority and number of the
Projects and schedule the Projects to correct to correct the
Qualifying Drainage System Deficiencies for each fiscal year.
The determination of the scheduling and funding for the
correction of the Qualifying Drainage System Deficiencies
shall be made by the Town, taking into account the following:
1. The availability and amount of the Storm Water
Utility Service Fees fund balance, revenue from
bonds paid by Storm Water Utility Service Fees,
and Storm Water Utility Service Fees in any given
fiscal year;
2. Prioritization of a ll other Projects, or qualifying
requested improvements, repair and maintenance
that are to be funde d with Storm Water Utility
Service Fees; and
Page 187 of 218
Standard Language Adopted on 11-04-2020
Page 15 of 33
3. The annual cost required to operate the Storm
Water Utility, its programs and initiatives, and
debt service.
iii. The T own will c omplete the Projects as determined by the
Town as a part of the Storm Water Utility Project
Prioritization and Annual Budget Process , unless
Emergencies or C asualties occur that alter the prioritization
and funding such that funds are insufficient to correct all
Qualifying Drainage System D eficiencies as intended within
the same fiscal year.
d. Scheduling of Projects: Other than in the case of an Emergency or
Casualty, the T own and the A ssociation shall mutually agree in
writing as to the scheduling of any Project to be performed under this
Agreement in the Development in advance of the commencement of
the Project.
e. Resident Notification: The Association shall be solely responsible for
the notification of its owners and guests that may be affected by any
Project, or by work to address any Emergency or Casualty.
f. Legal Access to Private Property : The A ssociation shall be
responsible for o btaining all access rights , including access rights
over and across property in the Development that is not owned by
the Association , as may be deemed necessary by the T own to
complete any Project.
Page 188 of 218
Standard Language Adopted on 11-04-2020
Page 16 of 33
g. Access Needed to Complete Project : The A ssociation shall be
responsible for providing clear and adequate physical access to each
Project site at no cost to the Town. If clear, adequate physical access
to the Project site cannot be provided sufficient to complete the
Project without the likelihood of damage to property, assets and
amenities by contractors and equipment, the repair and replacement
of any property, assets and amenities damaged as a result of the
Project shall be the responsibility of the Association, at no additional
cost to the Town. Such property, assets and amenities shall include,
but are not limited to, landscaping, flowe rbeds, ornamental shrubs
and trees, lawns, irrigation systems, boardwalks, cart paths,
driveways, and sidewalks. The determination of whether the access
is clear and adequate , and whether there is a likelihood of damage
shall be made in the sole discretion of the T own, prior to the
commencement of the Project . The A ssociation has the right to
withdraw the service request if the magnitude of potential damage is
not acceptable to the Association . If the service request is
withdrawn, completing the Project shall be the responsibility of the
Association.
h. No Guarantees Regarding Schedule: The Town cannot guarantee
that the amount of available Storm Water Utility Service Fees, the
number of Projects to be funded with Storm Water Utility Service
Fees in any given fiscal year, and whether Emergencies and
Page 189 of 218
Standard Language Adopted on 11-04-2020
Page 17 of 33
Casualties and weather related general emergencies will not cause
delays in the correction of Qualifying Drainage System Deficiencies
within the D evelopment and elsewhere. The parties acknowledge
that the Town’s determinations with respect to the priority, funding
and timing of any Project shall be made at the Town’s discretion and
shall be final.
5. Further Obligations of the Association: The Association agrees that during
the term, or any re newal term, of this Agreement, it shall take no action which
damages the Drainage S ystem, allows damage to the Drainage System, or creates
a Drainage System Deficiency, including, but not limited to allowing salt water
intrusion or pollutants to enter the Drainage System and allowing utility providers,
property owners, or their assigns to impair the function of the Drainage System .
To the extent the Association has a continuing obligation under the Covenants to
repair and maintain various improvements located within the Development
including lagoons and lagoon banks, ditch maintenance shelves, roads, pathways,
utilities, this Agreement is not intended to in any way restrict or limit the
Association’s completion of its obligations.
6. Payments as Current Expense of Town: A ny payments to be made by the
Town hereunder shall be made from Storm Water Utility Service Fees as budgeted
for by the Town in any given fiscal year. The Town and the Association intend that
the payment obligations of the Town shall constitute a current expense of the Town
and shall not in any way be construed to be a debt of the Town in contravention of
any applicable constitutional or statutory limitations concerning indebtedness of
Page 190 of 218
Standard Language Adopted on 11-04-2020
Page 18 of 33
the Town, nor shall anything contained herein constitute a pledge of general tax
revenues, funds, money or credit of the Town.
7. Emergency: The Parties agree that in the event of an Emergency, the following
procedure shall apply:
a. Agreement Not Terminated : This Agreement shall remain in full
force and effect.
b. Responsibilities of the Association: The Association shall take such
steps as may be reasonably necessary to secure any area affected by
the Emergency. The Association shall notify the Town as soon as is
practical after discovery of the Emergency. The Association may
complete any repairs to the Drainage System needed to address the
Emergency, as provided for in Article 10, below.
c. Responsibilities of the Town: Upon receipt of notification of an
Emergency from the Association, the Town shall determine the scope
and extent of the work that is necessary to repair or correct the
damage caused by the Emergency, and the means, methods and
materials needed to accomplish the same. The Town shall correct or
repair the damage caused by the Emergency as soon as practical,
taking into account the threat presented by the Emergency, the
existence of any other Emergency or Casualty , the cause of the
Emergency and/or the existence of any general emergency affecting
the Town and availability of funding . The T own may seek
reimbursement from third parties for any costs incurred by the Town
Page 191 of 218
Standard Language Adopted on 11-04-2020
Page 19 of 33
as a result of any Emergency found to have been caused by the
negligence of said third parties.
8. Casualty: The Parties agree that in the event of a Casualty, the following
procedure shall apply:
a. Agreement Not Terminated : This Agreement shall remain in full
force and effect.
b. Design of Drainage System: The Town shall produce engineering
and design plans at its expense for the reconstruction of all or any
part of the Drainage System affected by the Casualty.
c. Approval of Plans: The engineering and design plans must be
approved b y the Association prior to any reconstruction of the
Drainage System . If the A ssociation does not approve the
engineering and design plans prepared by the Town, the Association
may reconstruct the Drainage System at its own expense and shall
not seek reimbursement for the cost thereof from the Town.
d. Right of Entry and Access: If the engineering and design plans
approved by the Association require work outside of easement limits
described in the Access, Drainage and Maintenance Easement , the
Associa
Text truncated. Open the original for the full document.
Source: Town of Hilton Head Island website. First collected Nov 10, 2026.