September 10 (PDF, 22.8 KB)
City of Isle of Palms · Charleston County · Minutes
Open the original document More from City of Isle of Palms
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Public Works Committee
5:30 p.m., Wednesday, September 10, 2014
The regular meeting of the Public Works Committee was held at 5:30 p.m., Wednesday,
September 10, 2014 in the City Hall Conference R oom, 1207 Palm Boulevard, Isle of Palms,
South Carolina. Attending the meeting were Councilmember Loftus, Chair Ward, Administrator
Tucker, Director Pitts, Assistant to the Administrator Dziuban and City Clerk Copeland;
Councilmember Ferencz’ absence was excused. A quorum was present to conduct business.
1. Chair Ward called the meeting to order and acknowledged that the press and public had
been duly notified of the meeting in accordance with the Freedom of Information Act.
2. Approval of Previous Meeting’s Minutes
MOTION: Councilmember Loftus moved to approve the minutes of the regular
meeting of August 6, 2014 as submitted; Chair Ward seconded and the motion
PASSED UNANIMOUSLY.
3. Citizens’ Comments – None
MOTION: Chair Ward moved to re-order the Agenda to next address item 5.A.
Old Business – Update on Front Beach Lighting; Councilmember Loftus seconded
and the motion PASSED UNANIMOUSLY.
5. Old Business
A. Update on Front Beach Lighting – Westy Westmoreland, SCE&G
Westy Westmoreland, Manager of Lighting for SCE&G, and Sam Loggins, design engineer,
attended the meeting to present the proposed locations for the lights and the related costs; Mr.
Westmoreland indicated that Mr. Loggins has done the layout, the design and photometrics of
the Front Beach project. A map of the light placements was opened for the Committee
members to study; Mr. Westmoreland stated that they had looked at how the lighting pattern
lays out and, from that, deduced that a total of forty-one (41) lights would be needed to meet the
goals of the project. He assured the Committee that the proposed lights would not interfere with
turtle nesting. He stated that each pole will have a receptacle at a height of approximately
eleven feet (11 ft.); the actual light poles are eighteen feet (18 ft.) tall with the light fixtures
mounted at fifteen feet (15 ft.). Mr. Westmoreland explained that the height is dictated by code
to ensure that they are “out of the public space.” Although the poles are EPA rated for
withstanding strong winds, Mr. Westmoreland noted that, if these poles are damaged, the
responsibility for the repair or replacement would belong to SCE&G.
Chair Ward asked to have the “monthly facility fee” explained. Mr. Westmoreland stated that,
because the lights will be LED, SCE&G has a different program rather than having a rate per
pole and a rate per fixture. In this program, SCE&G takes the total cost of the job to determine
the facility fee, which is one point nine percent (1.9%) of the total cost per month. In addition,
the City will have an energy charge which is the actual energy usage of the lights. These
charges are part of a fifteen (15) year contract between the City and SCE&G; the contract
covers replacements, failures and any type of maintenance. He commented that this contract is
like the one (1) covering the Palm Boulevard lights.
Public Works Committee
September 10, 2014
Page 2 of 6
Chair Ward asked when the project could be completed once Council approves it; Mr.
Westmoreland indicated that SCE&G was planning to do the project over the coming winter
beginning in January with completion early in February. The Chair inquired whether they could
start earlier for the City’s use at Christmas. Mr. Westmoreland stated that the materials have
about an eight (8) week lead-time, but they could start before the materials arrive since the pro-
ject requires a considerable amount of boring.
Following Councilmember Loftus’ comment about the costs, Administrator Tucker stated that
the Committee had been presented two (2) options for fixtures despite the fact that the
Committee selected the Prague fixture in an earlier meeting; the Shepherd fixture has a lower
monthly cost.
Mr. Westmoreland stated that there is little difference in appearance between the two (2)
fixtures, but the monthly facility fee for the Shepherd fixture is approximately three hundred
dollars ($300) less than the Prague fixture. He added that SCE&G installs more Shepherd fix-
tures than Prague, so, if one (1) had to be replaced, it is likely that a new fixture would be
readily available.
The Administrator noted that the City was in good shape for the up-front costs of fifty-three
thousand twenty-five dollars ($53,025) according to the FY15 budget that includes one hundred
twenty-five thousand dollars ($125,000) for undergrounding lines and decorative lighting.
Depending on when the project is completed and goes on-line, an additional four thousand
dollars ($4,000) was added to the Municipal Accommodations budget for electricity expense.
The electric usage will be covered through the Municipal Accommodations Fee Front Beach
electricity and gas line item, and the up-front co sts are also being paid from Municipal Accom-
modations Fee.
Administrator Tucker asked Mr. Westmoreland to tell the Committee what SCE&G is adding at
no expense to the City. He reported that they will be adding six (6) outlet (pedestal) locations
for the holiday displays.
MOTION: Chair Ward moved to approve the SCE&G proposal for the Shepherd
light fixtures and changing to 200 amps per outlet; Councilmember Loftus
seconded.
Councilmember Loftus understood that the City will be adding to the holiday light displays in the
coming years and suggested that the City get as many pedestals as considered necessary.
Installing them when the other work was taking place would be much less expensive than
adding them later.
Councilmember Loftus asked whether there was hardware available for the poles to add other
decorative features in the future, and Mr. Westmoreland said that banner poles could be added
to the light poles. Two (2) banner poles would be added to each light pole at a cost of two
hundred dollars ($200) each and add two (2) to each light pole for a total of four hundred dollars
($400), half of which can be paid for through the Non-standard Service Clause. The
Councilmember stated that he wanted some kind of hardware that would support a metal wire
for swag decorative lights. Mr. Loggins said the banners hold fifty pounds (50 lbs.).
Public Works Committee
September 10, 2014
Page 3 of 6
Chair Ward inquired about the locations for the pedestals, and the Administrator responded that
they were to be where the light displays were placed last year. The Chair asked whether the
pedestals would be located close to the area where bands set up for outdoor festivals;
Administrator Tucker commented that the locations had been marked on a map that Mr. Loggins
and Mr. Westmoreland took with them. The Committee was told that the pedestals would be
installed and available for use for Christmas.
Director Pitts stated that there are ten (10) 110 amp outlets where the bands have set up in the
past; in addition, there is an outlet at every palm tree on the center island.
Mr. Westmoreland noted that every pedestal will have a meter, and each would be a separate
metered account.
AMENDMENT: Councilmember Loftus moved to amend the motion to
double the number of pedestals; Chair Ward seconded and the amendment
PASSED UNANIMOUSLY.
VOTE on AMENDED MOTION: The am ended motion PASSED UNANIMOUSLY.
The Administrator explained that the new lights will have remote monitoring by SCE&G’s master
control, allowing them to dim the lights, shut them off for an approaching storm or other
occasion. With the remote monitoring, the lights will signal the control if there is a problem.
Chair Ward thanked Mr. Westmoreland and Mr. Loggins for working with the City on this project
and for expediting the process; Mr. Westmoreland expressed his opinion that the lights will
make “a tremendous difference after dark.”
4. Department Reports for August 2014 – Director Pitts
With the end of the beach season, personnel are cleaning the beach on Mondays and Fridays,
as well as mowing some beach paths. Water had to be pumped after heavy rains on August 4
th
and 5th on 46th, 49th, 51st, and 52nd Avenues.
Director Pitts reported that he had had major problems with the compactor; in his opinion, it is
“on its last leg.” Despite multiple problems, the compactor is working now.
Administrator Tucker advised the Committee that the compactor was included in the FY15
budget for replacement. The Director noted that a compactor is not on state contract; therefore,
it will go out for bid.
Councilmember Loftus asked whether the bush-hog would be used again to clear beach
accesses; the Director assured him that the beach paths will be cleared by the end of Friday.
Director Pitts stated that SCDOT is scheduled to be on the island to mow the 41st Avenue ditch
tomorrow and deploy heavy equipment the water-side/the bike path side of Palm Boulevard
between 4
th and 8th Avenues.
Public Works Committee
September 10, 2014
Page 4 of 6
Chair Ward suggested that, when the compactor is replaced, the fence around it should also be
replaced because it is in poor condition; he thought that a concrete block fence. The Chair
noted that there is a restaurant below the compactor presently, and the smell is terrible. He also
asked that the City also consider enclosing the top.
Administrator Tucker asked the Director if he thought a new compactor would have better odor
control. Director Pitts noted that the compactor is seventeen (17) years old and, with no boxing
in areas at the bottom, leaching is occurring. When Carolina Waste takes it to the Bees Ferry
Landfill and before personnel begin the Ocean Boulevard route, they clean the area under and
around the compactor.
Being only two (2) months into the fiscal year, vehicle maintenance will be well under budget; he
stated that he continues to have issues with the Caterpillar, but it must fail before it can be fixed.
Trash Collection Tracking Reports
Garbage was up for the month of August in comparison with previous years’ collections, and
yard debris was down. He explained that one (1) reason debris was down due in part to issues
with the flatbed and the Caterpillar.
5. Old Business
A. Update on Front Beach Lighting – earlier in the meeting
B. Update on Seahorse Court and Intergovernmental Agreement
Having not received an intergovernmental agreement from Charleston County, there is no
progress to report on this matter.
C. Update on Eliminating Twice a Week Garbage Collection for the Summer of
2015
Director Pitts directed attention to the final two (2) pages of his reports; the first page is a com-
parison based on the next page’s information that reports on the tonnage picked up by each
truck for the dates noted. The Director stated that, from this page, he can determine where the
greatest amount of garbage is being picked up by the route the truck follows. Through the
summer, the Director said that he did not send any truck to the landfill on Thursday; he pointed
out that Friday collections went from sixty plus tons (60+ T) before school started to nearly
twenty-seven tons (27 T) after school started. Based on the numbers, he concluded that there
was a fair amount of empty space in the trucks after the Thursday collections; therefore, he
thought that the Public Works Department could follow the school calendar which would afford
personnel two (2) more weeks to clean the island of debris. Director Pitts commented that he
would not want to have once-a-week collections in the summer when the Department has five
(5) trucks four (4) days a week. If the City was to decide to have once-a-week garbage pickup
in the summer, the Director thought the City would need a sixth (6
th) truck and run shorter routes
Public Works Committee
September 10, 2014
Page 5 of 6
to get around the island which could be done without incorporating additional labor, but debris
removal operations would be shut down.
Councilmember Loftus asked the Director if he had ever considered that would focus on areas
with many rental properties toward the end of the week and have this route be the second
pickup of the week. The Councilmember considered the concentration of rental properties to be
on Ocean and Palm Boulevards, the avenues, and part of Wild Dunes, producing a modified
second pickup in the summer. In his opinion, doing this would be more efficient.
Director Pitts responded that such a modified schedule would be difficult to service some and
not service others, noting that there are rental houses in Forest Trail and on Waterway
Boulevard; he preferred to be fair to everybody on the island.
Councilmember Loftus countered that “all rental houses are not equal” based on the people-
capacity of the house.
According to Director Pitts, there are properties on the island that are still very busy in the two
(2) weeks leading up to the start of school, and they will have to purchase additional cans. In
his opinion, the issue becomes Grand Pavilion which is “still hammered” and has no place for
additional cans; he reported that Sea Grove has sixteen (16) cans in a corral; and he noted that
Pelican Bay has a place for four (4) bins and no room for additional cans.
Administrator Tucker believed Director Pitts to be advocating for ending twice-a-week garbage
collections the same week that the Charleston County Schools start in August and beginning
twice-a-week collections with Memorial Day.
Director Pitts reported that garbage collections begin to pickup with the Southeastern Wildlife
Show in February and increase weekly to the peak at the end of June.
Councilmember Loftus suggested that the City im plement the Director’s plan, continue to
evaluate and make changes as needed.
Administrator Tucker commented that she would check the City Code to ensure that the dates
for twice-a-week garbage collections are not defined there.
D. Report on Phase II Drainage Project
Administrator Tucker reported that staff is anxious to get started on the drainage project from
46
th to 52 nd Avenues and reminded the Committee that the engineer’s plan for the project is to
begin at the outfall. This is an existing outfall that will be improved with the funds included in the
FY15 budget; since water will continue to run through it, there will be no problems with
improving it first and letting is sit. Staff is trying to decide whether to proceed with that
component of the project solely with City funds or to utilize a portion of the grant funds from
Charleston County.
Public Works Committee
September 10, 2014
Page 6 of 6
The Administrator reported that she is in communication with members of the Charleston
County Transportation people to learn whether they would allow the City to use grant funds for
this part of the project. While one hundred perc ent (100%) of the project is public and for public
benefit, it must travel through private property to get to the outfall and the City must work with
two (2) private entities to accomplish the project. One (1) reason the engineer advocates for
beginning with the outfall is that the same people are in place with the private entities, the resort
and the Wild Dunes Community Association, that were in place when the City did Phase I of the
project; the City and engineer have a good track reco rd with them, and they will not have to be
convinced of the City’s success with the project.
When speaking with the Charleston County Transportation personnel, the Administrator was
asked what the City’s decision had been regarding the Palm Boulevard crossings at 46
th and
56th Avenues; they will be re-surfacing Palm Boulevard shortly from 41st to 57th Avenues. When
these crossing were originally discussed se veral months ago, the estimates had been quite
high, and the decision was not to do the project. Charleston County personnel asked whether
the City would change its mind if their contractor were to give a more reasonable estimate; the
Administrator said she would have to see the estimate before committing.
Councilmember Loftus asked whether the City would know when the re-surfacing was to occur,
and the Administrator said that the City might be informed of the week.
6. New Business
Contracts in Excess of $10,000 – None
7. Miscellaneous Business
Next Meeting Date: 5:30 p.m., Wednesday, October 8
th in the Conference Room
8. Adjourn
MOTION: Councilmember Loftus moved to adjourn the meeting at 6:28 p.m.;
Chair Ward seconded and the motion PASSED UNANIMOUSLY.
Respectfully submitted:
Marie Copeland
City Clerk
Source: City of Isle of Palms website. First collected Nov 10, 2026.