REAL PROPERTY COMMITTEE
5:30 p.m., Wednesday, September 4, 2013
The regular meeting of the Real Property Committee was held at 5:30 p.m. on Wednesday,
September 4, 2013 in the City Hall Conference R oom, 1207 Palm Boulevard, Isle of Palms,
South Carolina. Attending the meeting were Councilmembers Loftus and Buckhannon, Chair
Stone, Administrator Tucker, Assistant to the Administrator Dziuban and City Clerk Copeland; a
quorum was present to conduct business.
1. Chair Stone called the meeting to order and acknowledged that the press and public had
been duly notified of the meeting in accordance with the Freedom of Information Act.
2. Approval of Previous Meeting’s Minutes
MOTION: Councilmember Loftus moved to approve the minutes of the regular
meeting of August 14, 2013 as submitted; Councilmember Buckhannon seconded
and the motion PASSED UNANIMOUSLY.
3. Citizens’ Comments – None
4. Comments from Marina Tenants – None
5. Old Business
A. Status of Tidal Wave Watersports Dock Replacement
Administrator Tucker reported that, as per the Committee’s request, a meeting was held
involving all parties associated with the dock replacement, i.e. City staff, the Fiem brothers,
Phillip Smith, Jay Clarke, Brian Berrigan and John Shaffer. All of the possibilities were
discussed and everyone had an opportunity to opine regarding what should happen next; a
considerable amount of time was spent discussing the future plans for the reconfiguration of the
entire marina site. The suggestion was made that replacement of the Tidal Wave dock should
stop and energies put into the marina enhancement project, ensuring that what was being done
with the dock replacement was consistent with the future of the marina. The discussion finally
honed in on what should be done with the Tidal Wave dock now - was it possible to wait longer
for the replacement? Could minor re-designs be made to the existing proposal? Mr. Shafffer
has generated a very informal sketch that takes the existing permit and scales down the
operational structure and moves the stationary part of the dock a little farther from the Smith’s
property line. Additionally, Mr. Shaffer made a trip to the marina for a visual examination of the
dock, and his assessment of the docks is as follows:
• The handrails are very dangerous and need to be replaced;
• The repairs made after the dredging are holding;
• The walkway, the stationary part of the dock, is not to commercial standards as it is a
residential dock; therefore, it was not built to withstand the load capacity it handles;
• Although not viewed at dead-low tide, there were no major signs of rot in the visible
portion of the piling; and
• In his opinion, the dock is not in a state of imminent failure, but there are areas of
concern.
Real Property Committee
September 4, 2013
Page 2 of 4
In the Administrator’s view, the Committee’s options are as follows:
• Move forward with the permit as originally designed;
• Move forward with alternate sketch; or
• Shore up identified areas of concern, postponing the replacement until such time as
there are plans for the complete marina enhancement project.
Administrator Tucker voiced concerns about the available money in the Marina Fund and how
long it might be before any forward movement is made toward the marina enhancement. In the
meantime, there are specific safety issues about the existing Tidal Wave dock.
Mr. Shaffer did list pros and cons to his new sketch; the pros are that it maintains docking space
on the inboard side of the north end of the proposed floating dock, it maintains the same
dimensions and impacts as the original proposed structure, which is important for regulatory
permitting, and it increases by twenty feet (20 ft.) the distance from the proposed covered
pierhead to the Smith’s property line. The only con he stated is that the new sketch maintains
the approximate same distance between the existing fixed structure and the Morgan Creek
docks.
The Administrator related that, in discussions about the bid package, alternates would be
included, such as the re-use of anything that could be re-used, and Marina Manager Berrigan
had requested that the use of concrete as an alternate material.
Mr. Smith re-stated that his primary concern is having his property impacted more in the future
than it is today; he added that he and his wife are very opposed to the increased size of the
operations structure that will obstruct the view from his property. He described the proposed
structure as the biggest on the waterway from the island to Patriots Point. Mr. Smith said that
he does not want to negatively impact Tidal Wave’s business, but he believes that there must
be other options if the City slows down to investigate them. He had hoped to have more docks
between his property and Tidal Wave, but the consensus from the meeting was that Tidal Wave
needs to stay where it is for safety reasons.
Michael Fiem stated that he wants to work with Mr. Smith and had thought from conversations
earlier in the day that they were close to an agreement.
Chair Stone re-stated his understanding that the crux of the disagreement relates to the size of
the roof on the operations structure; he asked Michael Fiem if the roof could be scaled back
more, and the response was that it could.
After more discussion, Mr. Smith and the Fiem brothers have been asked to meet to resolve the
problem as soon as can be arranged; once a resolution is met, they need to notify the City
Administrator so that a special meeting Real Property Committee can be called. The
Administrator reminded the Committee that the goal had been to get the project bid so
construction could take place over the winter months when Tidal Wave is not operational; any
significant change to the building will likely mean modifications to the permit which will delay
moving forward.
Real Property Committee
September 4, 2013
Page 3 of 4
Councilmember Loftus asked how a proposed change will affect the funding for the project. If
Mr. Shaffer has to re-design the plans and resubmit the permit, there will be a cost component.
If the Morgan Creek docks are to be re-designed, the Administrator expects the costs to double
what has been paid already. Responding to Councilmember Loftus’ question, Administrator
Tucker said that the engineering and design for the project was less than thirty thousand dollars
($30,000), and the budget for construction is three hundred twenty-nine thousand dollars
($329,000). Councilmember Loftus voiced agreement with Mr. Smith about spending so much
money for an entity that brings only eighteen thousand dollars ($18,000) in rent to the City each
year; he expressed interest in ways that will bring the costs down.
B. Status of RFB for Replacing Fuel Dispensers at the Marina
Assistant Dziuban reported that the City had received one (1) bid for the land-based fuel dispen-
sers at the marina, and the bid tabulation had been included in the meeting packet. The City
received advice from one (1) potential bidder that it might be necessary for the City to upgrade
the two (2) systems, point-of-sale and Veeder Roo t, that work with the fuel dispensing system,
so the upgrade was included in the bid as an alternate. The bid for the fuel dispensers of fifteen
thousand five hundred twenty-six dollars ($15,526) is well below the budget of thirty-thousand
dollars ($30,000); the alternate is for the point-of-sale and Veeder Root systems and are in
addition to the fuel dispensers. Since the Veeder Root system can be married to the operating
system of the new dispensers, it does not need to be replaced, but there is benefit to replacing
the point-of-sale system at about eleven thousand dollars ($11,000). Both the fuel dispensers
and the point of sale system can be replaced for the thirty thousand dollars ($30,000) budgeted.
After further communication, it was learned that a newer and better point-of-sale system will be
released soon, so staff believes that there is merit in delaying a decision on the point-of-sale
system. The Administrator said that a later award to the same vendor for the point-of-sale will
not be a new bid.
Councilmember Loftus asked if the point-of-sale system could also work in the store, but
Assistant Dziuban said it will not; it is impor tant to the fuel management and fuel dispensing
system.
The Councilmember then asked if the new fuel dispensers would have smart phone technology;
Assistant Dziuban responded that the answer to this type of question is why staff wants to delay
a decision on the point-of-sale.
MOTION: Councilmember Loftus moved to recommend an award of a contract
to Central Industries, Inc. for the base bid of $15,525.95 for new fuel dispensers
for the marina; Councilmember Buckhannon seconded and the motion PASSED
UNANIMOUSLY.
6. New Business
A. Consideration for Applying for a Standby Permit for Erosional Area of
Breach Inlet
Real Property Committee
September 4, 2013
Page 4 of 4
Administrator Tucker explained that this item is on the agenda based on the presentation by
Coastal Science and Engineering (CSE) at th e August City Council meeting where Steven
Traynum had stated that the erosional triggers, defined in the permit, for the northeast end of
the island had been met. When asked if the same were not true for Breach Inlet, Mr. Traynum
responded that the answer was likely to be yes, but the City does not have a permit under which
to act at Breach Inlet. If CSE’s prediction that Breach Inlet will begin to accrete is inaccurate, it
may be prudent to have a permit that would allow the City to take an action if the erosion
continues and reaches a crisis point. Since the City has been setting aside funds in the Beach
Maintenance Fund, there is sufficient funding to task CSE with putting together a standby permit
under which the City may act if the area at Breach Inlet continues to deteriorate.
Councilmember Loftus asked how long it would take to get the permit; the Administrator said
that the putting the permit application is not a long process, delays come with getting approvals
from OCRM and the Corps of Engineers. Since CSE has been monitoring Breach Inlet as part
of the on-going beach monitoring service, the Ad ministrator anticipates they will develop the
permit application rather quickly. He voiced approval of getting a price from CSE for generating
the permit application, and the other Committee members concurred.
The Committee agreed that the proposal from CSE could be put on the Ways and Means
Committee agenda without getting prior approval from them.
B. Consideration of Contract in Excess of $10,000 – None
7. Miscellaneous Business
Marina Rents Report
Administrator Tucker reported that all monthly rents owed to the City are current. On the
subject of additional rents, the City has received the data from Morgan Creek Grill’s additional
rent and a partial payment; additional rent for Marina Joint Ventures based on their fiscal year
are due November 1, 2013; no additional rent is due from Marina Outposts based on their
financial statements; and additional rent from Schupp Enterprises for the Front Beach parking
lots is due October 30, 2013.
Next Meeting Date: 5:30 p.m., Thursday, October 3, 2013 in the Conference Room.
8. Executive Session – not needed
9. Adjourn
MOTION: Councilmember Loftus moved to adjourn the meeting at 6:30 p.m.;
Councilmember Buckhannon seconded and the motion PASSED UNANIMOUSLY.