REAL PROPERTY COMMITTEE
5:30 p.m., Thursday, October 3, 2013
The regular meeting of the Real Property Committee was held at 5:30 p.m. on Thursday,
October 3, 2013 in the City Hall Conference Room , 1207 Palm Boulevard, Isle of Palms, South
Carolina. Attending the meeting were Councilmember Buckhannon and Loftus, Chair Stone,
Administrator Tucker, Assistant to the Administrator Dziuban and City Clerk Copeland; a
quorum was present to conduct business.
1. Chair Stone called the meeting to order and acknowledge that the press and public had
been duly notified of the meeting in accordance with the Freedom of Information Act.
2. Approval of Previous Meetings’ Minutes
MOTION: Councilmember Buckhannon moved to approve the minutes of the
regular meeting of September 5 and the Special Meeting of September 19, 2013 as
submitted; Councilmember Loftus seconded and the motion PASSED
UNANIMOUSLY.
3. Citizens’ Comments - None
4. Comments from Marina Tenants
Jay Clarke of Morgan Creek Grill asked that the issue of control of the docks assigned to the
restaurant be added to the agenda for the November meeting. He indicated that he might
suggest installing a gate to control the regular abuse by boaters who are not customers of the
restaurant.
Chair Stone stated that he had heard a favorable report and looked forward to a proposal.
5. Old Business
A. Status of Tidal Wave Watersports Dock Replacement
Administrator Tucker noted that this has been an evolving circumstance as efforts are made to
come up with a mutually agreeable alternative that will allow for the replacement of the
TidalWave dock and be comfortable for the immediately adjacent property owners. Shortly
before the meeting, John Shaffer provided two (2) additional alternatives for consideration; the
Administrator explained that other alternates have not been discussed in depth because, once
put on paper, the options were not cost-effective or feasible.
The email Mr. Shaffer sent to the stakeholders, as well as the additional drawings are attached
to the historical record of the meeting. These drawings came out of the Special Meeting of
September 19
th, subsequent conversations with st akeholders and an early morning meeting
with Mike Malley of TidalWave, Phillip Smith and Mr. Shaffer today.
Alternate 4 is a minor tweaking of Alternate 1; the pierhead has been shifted into the line of sight
and align it with the existing pierhead so as to impact the view from the Smith’s as little as
possible; the pierhead has been reduced to twenty feet by twenty feet (20 ft. X 20 ft.); and the
ten foot by ten foot (10 ft. 10 ft.) platform at the shore connection has been eliminated to reduce
Real Property Committee
October 3, 2013
Page 2 of 11
project costs. The total project cost for this alternate is two hundred ninety-three thousand four
hundred nine dollars ($293,409), including a twenty percent (20%) contingency.
Alternate 5 is based on Marina Manager Berrigan’s suggestion to explore the option of a
shorter, more direct connection of the fixed walkway to the bulkhead. The footprint of the
pierhead was not moved any further north than the existing one due to navigation safety
concerns, leaving some space remaining between the south end of the Morgan Creek docks
and the new structure. Mr. Shaffer stated that he believes that it is unwise to put in a new
structure in exactly the same footprint. In this drawing the pierhead is sixteen feet by sixteen
feet (16 ft. X 16 ft.), which is smaller than ideal; it also considers the construction of a small
building on the upland from which to conduct some of the operations. The cost estimate does
not explore the costs associated with that, par ticularly improvements to parking area and the
fence in order to accommodate it. With this alternate, the costs of the marine construction are
reduced to two hundred fifty-nine thousand dollars ($259,000) with a twenty percent (20%)
contingency. Mr. Shaffer stated that this is a compromise, and he is not sure that it is an ideal
situation for the parties involved, but it does replace the existing structure, maintains some
navigation room, locates the pierhead in the line of sight from the Smith’s property and takes
advantage of the deeper water on the north end. Mr. Shaffer pointed out that, if the City
considers this alternate, the area is very much under-utilized and would relieve some of the
parking pressure that exists at the marina. He concluded that no consensus was reached today
in his meeting.
The option referred to as August 26, 2013 is another idea Mr. Shaffer has had; once he applied
costs to it with replacing the finger piers and other improvements is likely four hundred twenty-
five thousand dollars ($425,000). He stated that he does not have a clear recommendation, but
indicated that all parties had made a good faith effort to reach a consensus.
Councilmember Buckhannon asked about the reduction in size of the pierhead from Alternate 4
to Alternate 5. Mr. Shaffer stated that it was simply to show it smaller for less of an impact on
the Smith’s view, and he thought it could serve temporarily until the upland improvements were
made. Mr. Shaffer added that it is larger than the covered space they have today, that it is the
normal size for a covered pierhead for the Waterway and it reduces the project cost. Increasing
it to twenty by twenty (20 X 20) would not significantly increase the project costs which are
between two hundred fifty and three hundred thousand dollars ($250,000-$300,000).
Councilmember Stone asked whether these two (2) alternates would require permit modifi-
cations; Mr. Shaffer responded that he thought a letter modification would suffice since the
floating dock is the same size and in the same location, the fixed pierhead is smaller and the
fixed walkway is shorter. He stated that OCRM is close to issuing their permit; the water quality
certification has been issued by DHEC; the state permit should be coming in a couple of weeks.
Mr. Shaffer said that a formal request to modify should not be made until the City has both the
state and federal permits; with the permits in hand, negotiation is possible.
At this point, Chair Stone opened the floor for comments from the primary stakeholders in the
project, i.e. TidalWave Watersports and Phillip Smith.
Real Property Committee
October 3, 2013
Page 3 of 11
Mike Malley, representing TidalWave Watersports, stated that the modifications and changes
that have occurred were not at the request of Ti dalWave or their desire for a new and improved
dock; he noted that the dock replacement was in the City’s FY14 budget and asked TidalWave
what they needed in a new dock to run their business. The sixteen foot by sixteen foot covered
work area is smaller than the existing dock and would hurt their ability to provide the same ser-
vice to the five or six thousand (5,000-6,000) guests that cross their dock annually. He stated
that TidalWave Watersports is one of the most searched and found destinations on the Isle of
Palms; he remarked that this business attrac ts people from Seabrook, Kiawah and Folly Beach
to the island, specifically to enjoy their activiti es and ultimately dine and shop on the island. It is
the opinion of the TidalWave owners that any improvements made to their business will only
serve to improve the impression people have of the Isle of Palms in general. Through all of the
dialogues, TidalWave has realized that the business is in a good location in the marina as far as
the floating dock’s location, and only the fixed pierhead is the object of debate. If the question is
to re-locate the business in the marina or to wait for a short-term solution, TidalWave would
prefer to make the necessary safety repairs now and delay the replacement for two or three (2-
3) years.
Mr. Shaffer stated that the pierhead from Alternate 4 could be used in Alternate 5 and vice
versa.
Phillip Smith voiced agreement with Mr. Malley about delaying the project until such time as a
plan that was acceptable to all parties was developed. He stated that he had suggested a way
to move forward with the project and to save money for the City; the plan was to use the com-
mercial-grade ramp that goes to the dock and access the jet-ski facility off the end of it, which
would flip the plan as drawn. He thought good ideas had come from the meeting earlier in the
day that are not on paper due to time constraints. Mr. Smith voiced his opinion that the parking
lot is under-utilized for the volume of cars there in the summer months; he indicated that the
area near the recycling dumpsters is overgrow n and not used. He suggested that a private
entity be hired to study the parking and the marina and to develop a plan for the best use of
space. He expressed the belief that everything could be made to work to everyone’s satisfac-
tion given enough time.
Marina Manager Berrigan voiced surprise at TidalWave’s stance, but he agreed that it was the
right action to address the safety needs now and to delay replacement. He suggested putting
some the money earmarked for this project into an overall marina plan; he would like to have
support from the City to do what is best for the entire sight.
A brief discussion followed relative to Mr. Berrigan’s idea of having the ramp go straight out from
the area near the fence and the use of a single ramp. Mr. Malley noted that, with one (1) ramp,
TidalWave would not be able to police it to ensure that they are providing family-friendly enter-
tainment; he also stated that a floating dock would not work for the business since it is not
located in a “no wake” zone, but on the Intracoastal Waterway where they are regularly rocked
by wakes.
Michael Fiem asked whether the design with the straight-out dock kept the business in its
present location or moved it towards Morgan Creek Grill. Mr. Berrigan stated that the business
Real Property Committee
October 3, 2013
Page 4 of 11
would be inside the green fence. Mr. Fiem stated that he could work with that design, but he
would ask for dedicated parking and directional signage.
Except for its proximity to the Smith’s property, Mr. Shaffer remarked that the first design was
the best option, looking at all of the site constraints, the available budget and working within the
existing footprint of the TidalWave dock.
Councilmember Buckhannon stated that Mr. Smith, the owners of TidalWave and the marina
manager agree to delay construction of a new dock; he recalled that the issues arose after the
permit application was submitted and the design went out for public notice. The Councilmember
suggested carrying the three hundred thousand dollars ($300,000) budgeted in FY14 to the
FY15 budget and possibly adding another two hundred thousand dollars ($200,000) to
reconfigure the Intracoastal Waterway side of the marina.
Chair Stone added that he would like to see a more comprehensive approach to the matter,
and, if the tenants are willing to wait one or two (1-2) years, he too would like to see
comprehensive study of the overall project.
Jay Clarke of Morgan’s Creek Grill agreed with waiting for a year or so and suggested that the
tenants meet and develop a plan to present to Council.
While Councilmember Buckhannon agreed to view the entirety of the marina for a
comprehensive plan, everyone should be aware that any project at the marina will have to be
done in phases.
Mr. Shaffer agreed that a comprehensive approach was sensible, as well as a consensus-based
stakeholder approach. If the safety concerns are addressed, the dock will last for several more
years.
Looking back, Councilmember Loftus indicated that the Committee did not communicate well
and suggested that, in the future, the stakeholders should be brought in earlier, possibly as an
advisory committee.
Administrator Tucker stated that, if the Committee’s intention is to re-direct funds from the FY14
budget, a motion should be made to rehabilitate the dock in this fiscal year using a portion of the
funds allocated for the dock replacement and move the funds into the next fiscal year. In
addition, the Administrator explained that the dock replacement was included in the budget
because the replacement had come up on the City’s long range capital plan for FY14.
MOTION: Councilmember Buckhannon moved to allocate funds from the
TidalWave dock replacement to address the safety issues of the existing dock and
to re-allocate the balance to the FY15 budget to take steps toward a comprehend-
sive plan for the marina site; Councilmember Loftus seconded and the motion
PASSED UNANIMOUSLY.
Mark Fiem noted that one (1) item in the replacement of the dock was reconfiguring the
electrical service for the dock; he asked if that work could still be done, and Administrator
Real Property Committee
October 3, 2013
Page 5 of 11
Tucker indicated that would certainly be considered a safety concern to be addressed along
with the handrails.
Before proceeding to the next item of busines s, Councilmember Loftus thanked Mr. Shaffer for
his patience and for the excellent work he has done for the City; he added that he hoped the
City would have a long-term relationship with Mr. Shaffer and his company.
B. Consideration of a Feasibility Study for Erosional Area of Breach Inlet and
Discussion, if needed, Related to Shoal Management Project on the Beach from
53
rd Avenue to Dewees Inlet
Steven Traynum of Coastal Science and Engi neering (CSE) arranged to attend tonight’s
meeting to discuss issues relative to the island’s beach.
Administrator Tucker explained that the Committee has two (2) issues to discuss, i.e. the need
for a permit relative to erosion at Breach Inlet and a shoal management project on the northern
end of the island. The Administrator recounted that, at the Ways and Means Committee
meeting in September, the fact that a permit application was going to cost into the six (6) figures
was discussed; staff also informed the Committ ee that CSE had suggested a feasibility study at
this time. The discussion concluded with the Ways and Means Committee sending the item
back to the Real Property Committee for further discussions.
Mr. Traynum reported that Dr. Tim Kana was suggesting that, rather than moving forward with a
permit, the City should proceed with a channel realignment project, which is similar to an off-
shore dredging project in terms of permitting and planning. A channel realignment project
involves moving less material and is easier logistically, keeping construction costs lower.
The feasibility study will take the City through the initial steps of a permit application process up
to the point where a permit application could be submitted. The study will outline available
alternatives, determine how much sand needs to be added to the beach, determine whether
sand needs to be put on Sullivan’s Island, and involve other people for feedback before submit-
ting an application. CSE will provide a preliminary design for the project that would be ready to
go into a permit application, indicating where the channel will be, where sand will be placed on
the beach and how it would be configured, as well as an opinion on the cost. In
correspondence with the regulatory agencies, an outline would be made listing exactly what is
needed to complete the process from submittal of the application and what environmental
documents would be needed.
The Administrator summarized that it would not be wasted work and it would demonstrate
responsiveness to the erosion at Breach Inlet.
At the moment the only actions that would be allowed immediately are adding more sand to the
beach because the water must be within ten feet (10 ft.) of the house. Once it hits that critical
line, the homeowner can put in sand bags.
Responding to Chair Stone’s question about the ability to scrape, Mr. Traynum stated that
scraping in only allowed with a permit or after a storm to restore a dune.
Real Property Committee
October 3, 2013
Page 6 of 11
The only other immediate action would be the installment of a revetment if the water is landward
of the baseline, but such an action is not allowed per the City’s Beach Management Plan.
Councilmember Loftus asked whether Mr. Traynum still believes that Breach Inlet will heal itself
over the long term, and he confirmed that he does. He did suggest putting money aside for
more frequent monitoring of that area to have comparative numbers to know when it begins to
self-correct. Mr. Traynum pointed to aerial photographs showing that sand is moving toward
Breach Inlet and the area from 53
rd Avenue down to Front Beach is gaining sand, which further
indicates that Breach Inlet will heal. The configuration of the inlet right now is causing it to
bypass the south end and go to Sullivan’s Island; the realignment project works by pushing
sand back to the island.
Responding to Chair Stone’s inquiry about what a feasibility study would entail, Mr. Traynum
said that it would involve field work, some survey work of Sullivan’s Island beach to tie with work
done here, a potential layout of where the dredge would go – assuming that is the best alterna-
tive, a decision on whether the project would require an ocean-certified dredge or a harbor
dredge – a major factor in costs; basically it would a preliminary design that would make the City
ready to submit a permit application without t he environmental reports. The feasibility report
details the alternatives, gives a probable cost of construction and provides a couple of
alternatives; it will include correspondence with the regulatory agencies. The cost associated
with the feasibility study is estimated at approximately fifty thousand dollars ($50,000).
Administrator Tucker stated that the fund has approximately four hundred thousand dollars
($400,000) in it today. In the Administrator’s opinion, the City learned from its 2008 project that
it is better to be ready to act and be proactive in a position to act rather than to be reactive if, in
fact, the Inlet does not turn around as predicted. If the City does not prepare, there will be some
frantic property owners looking to the City to act quickly and there will be no quick solutions that
will make a significant difference. The Administrator noted that property owners have been
coming to the Building Department looking for assistance; this action would show to them that
the City is paying attention to the entire beach, not just reacting to one (1) erosion situation.
Since the City does not have any permit preparation, it cannot react at Breach Inlet the way it
can in the other problem areas of the beach.
According to Mr. Traynum, if the changes in the Inlet allowed trucks to get to sand that is in the
Inlet, it opens up the opportunity to move sand around; there are no critical habitats there with
which to be concerned. The feasibility study will also look at the unlikely situation where a
sandbar comes close enough to shore or builds up enough to be accessible at low tide, allowing
for trucks to get to it to move sand.
Councilmember Buckhannon noted that there are a lim ited number of properties in this area,
particularly at 1
st and 2nd Avenues.
On the subject of increased surveying, Mr. Traynum explained that CSE does a beach survey
and a full mapping of the inlet to know where the channels and the shoals are; the work typically
takes two (2) days. A quick letter-style report would likely cost six or seven thousand dollars
($6,000-7,000); a more detailed analysis with a summary report would be closer to ten thousand
dollars ($10,000). Mr. Traynum recommends quarterly monitoring through the winter storm
Real Property Committee
October 3, 2013
Page 7 of 11
season; if it determined that the Inlet is healing, the monitoring could be slowed or stopped. If
the City decides to proceed with the feasibilit y study, this information would be included; the
cost could be reduced also by performing only the beach and boat work.
Mr. Traynum added that, when he was at Breach Inlet three (3) weeks ago, he could see signs
that the dunes are healing.
Chair Stone likes the idea of a feasibility study because it is comprehensive and takes the City
to a point where it fully understands whether it needs to react. He noted that the full moons are
pulling harder on the tides than he ever remembers. He agrees that monitoring has its merits,
but with the increased number, the City will end up spending nearly the same amount of money.
Since the beach is in a constant state of change, Councilmember Loftus said he favors
monitoring that will give more timely information; the feasibility study is a one-time event that
becomes dated once it is finished.
Assistant Dziuban asked how long the information contained in a feasibility study is considered
to be valid, and Mr. Traynum responded that it is good for several years, because the majority of
it is focused on detailing an overall conceptual plan and doing the historical analysis to see
where the Inlet has been and where the channel has been, doing much of the pre-permit
correspondence, etc.
Chair Stone countered that the feasibility study puts the City one (1) step closer to a permit if an
action is needed; the monitoring is just data collection, and the City would then need a feasibility
study to get to any action. Mr. Traynum remarked that a feasibility study is required for a permit.
According to Mr. Traynum, no information is dated until the City actually receives a permit, then
the City has five (5) years with the option to extend another five (5) years if progress is shown.
MOTION: Councilmember Buckhannon moved to recommend a feasibility
study to the Ways and Means Committee; Chair Stone seconded.
A ten thousand dollar ($10,000) monitoring would include a survey that would be comparable to
what has been done on the north end plus a detailed report; it can be done cheaper if it were to
be land-based, a one (1) day survey, from behind the dunes to as far into the water as one can
wade. This will tell a lot about the beach condition, but not about the Inlet and the shoals.
Administrator Tucker stated that, if the Committee is interested in doing the additional
monitoring as well, it can be accomplished with a modification to the existing agreement for
frequency of monitoring.
VOTE: The motion FAILED on a vote of 1 to 2 with Councilmember Loftus and
Chair Stone casting the dissenting votes.
Real Property Committee
October 3, 2013
Page 8 of 11
MOTION: Councilmember Loftus moved to recommend to Ways and Means
that the City increase monitoring in Reaches 1 and 2 to quarterly; Councilmember
Buckhannon seconded and the motion PASSED UNANIMOUSLY.
Mr. Traynum agreed to have a cost proposal for the Ways and Means Committee meeting.
On the erosion on the north end of the island, Mr. Traynum reported that there are two (2) areas
that meet the one hundred foot (100 ft.) triggers to do a project; one (1) area is around Ocean
Club, Seascape and the eighteenth (18
th) green and the other is around Dunecrest Lane. The
window for an event could happen is November 1, 2013 to May 1, 2014.
Mr. Traynum stated that he had spoken with Mary Hope Green at the Corps of Engineers who
stated that they are ready to issue the permit modification, but she must correspond with the
National Marine Fishery Services to inform them that the permit is not going to require biological
monitoring, then they will have ten (10) days to comment. He voiced assurance that nothing will
interfere with the permit modification being iss ued, which takes away from the City’s concern
over using the single event that remains on the permit.
According to Mr. Traynum, the current situation is that the shoal is moving on shore, especially
in front of Grand Pavilion, where the beach is building out and areas beside where there is an
erosional arc. This takes away some of the concerns for the Dunecrest area, but it could
potentially still use additional sand.
The area of Ocean Club and Seascape is a bad spot now, and, unfortunately, the big shoal has
not attached yet so the City cannot get land-based equipment out to harvest sand, which is the
ideal scenario. The present situation is similar to 2012 where there is enough sand on the
beach behind the shoal that has been building from the adjacent areas so a project can just put
the sand back. A new project would be of simila r scope or potentially larger because there will
be more sand by the time the project begins. In 2012, the project was on the tail end of the
shoal as the shoal was already spreading out; this event will be on the front end of a shoal and
catching the beach before the shoal actually gets there, which is a better position to be because
it will re-nourish itself naturally.
In Mr. Traynum’s opinion, the biggest question is whether the City wants to move forward with
an interim project to buy time for the shoal to completely attach, then see how the beach looks,
and whether to use that sand again next year to spread. The shoal should completely attach by
the end of the 2014 beach season so that land-based equipment could access that shoal sand
and move it around if needed. There is, of course, the possibility that the shoal will attach and
begin to spread; however, Mr. Traynum does not think the shoal will attach quickly enough to
nourish itself naturally over this winter and fill over the next summer season without the
sandbags being compromised or maintained.
Chair Stone noted that, at the moment, the City has one (1) event remaining on its permit, and
the permit expires in March 2017. He voiced concern over using that event without having the
permit modification in-hand. Mr. Traynum re-assured him that, since it is the federal side of the
permit, it cannot be appealed, and he is confident that the City will have the permit before a
project could begin.
Real Property Committee
October 3, 2013
Page 9 of 11
The Chair questioned how dire the need was for a project; he indicated that he has been to the
area of concern and gets a sense that it is beginning to heal with the exception of the area
around the eighteen (18
th) green.
Administrator Tucker noted that Beth Colley, who is responsible for one (1) of the associations
in Wild Dunes, was present earlier; she attended the meeting because the membership is
pushing her to push the City to take an action. She is calling repeatedly to know when the City
is going to act, meaning that there are people who contributed to the 2008 project who are now
being affected by this latest shoal attachment.
Mr. Traynum stated that he spoke with her prior to the meeting, and the problem at her regime
is a really focused erosional arc right at Ocean Club and Seascape that has been creeping to
the west for the past several months. This arc was originally focused at the eighteenth (18
th)
green, but is now at Ocean Club and moving toward Seascape, which might continue. The
owners in that area are having to maintain their sandbags which can be very expensive; he
commented that he had seen a couple of sand bags at Breach Inlet on a visit a couples of
weeks ago – they are going to be destroyed and t hey are going to wash away. Mr. Traynum
was under the impression that the permit for the sandbags expires at the end of 2013; the bags
are to be moved at that time, leaving those owners with no protection. He voiced the opinion
that the property owners will not remove them and will be fined accordingly.
Mr. Traynum suggested that the City wait as long as possible to maximize the benefit from the
sandbags and delay the project as long as possible and still fit it into the window ending May 1,
2014.
Councilmember Loftus voiced concerned over the fact that there are still four (4) years
remaining on the permit, leaving only one (1) additional action on the permit. Mr. Traynum
clarified that the permit modification will add two (2) events to the permit, and he reassured the
Committee that, once the shoal attaches, it will provide the beach with a couple of years of
sand.
Councilmember Loftus asked Mr. Traynum what the “drop-dead” date was for a decision on a
2014 project; Mr. Traynum said that the last pr oject took sixteen (26) work days on the beach
with about sixty (60) days of preparatory work. Discussions on reopening Baker’s contract are
being considered since the action will be under the same permit only amended as to frequency.
Mr. Traynum said that CSE would need to develop a final design and a new set of plans that
would outline how much sand could be borrowed fr om where, which will involve another land-
based survey.
Chair Stone asked that, if the Committee was to authorize that now and the City did not see a
need for a project until January, to bid in February and March for construction to begin April 1,
would the survey still be valid. Mr. Traynum st ated that CSE would need two to three (2-3)
weeks’ lead time to do the survey, adjust the plans and put into a workable plan. If the project
has to be re-bid, CSE would need time to generate new contract documents.
Real Property Committee
October 2, 2013
Page 10 of 11
The Administrator stated that the City was hoping to be able to use Baker again because they
gave the City a good price and the City had such a successful working relationship with them on
the beach. Dialogue has occurred with the City Attorney about whether or not the contract
could be re-opened since the work is under an existing permit.
Mr. Traynum said that another land-based survey could be done in a day that would provide
information on how much sand is available to move or if the Dunes Crest area is getting any
worse. Such a monitoring would cost approximately five thousand dollars ($5,000), and CSE
would provide a letter/report giving the conditions found.
Ms. Colley had said that she prefers the sand bags because they provide guaranteed
protection.
The Chair voiced the Committee’s consensus agreement to delay action.
Councilmember Loftus suggested that staff communicate with the community association
affected to keep them informed on the City’s activities.
C. Discussion of Municipal Parking Lots
Councilmember Loftus stated that he had asked that this be placed on the Agenda based on
public comments at the September City Council minutes; he expressed a desire to know what
the City’s position/policy is on items being stored on the lots.
Chair Stone recalled getting an email from someone who was concerned; Councilmember
Loftus confirmed that this person had spoken at the Council meeting.
Councilmember Buckhannon understood the biggest complaint to be that, if there is to be
storage on the lot, it should be moved to the back of the parking lot.
Administrator Tucker reminded the Committee that the “COWs” are about to be mobilized for
the improvements to the water tower, so it will be unsightly for a while.
Councilmember Loftus asked whether there was anything in the parking lot contract regarding
additional storage of anything other than cars. Chair Stone replied that, as the tenant, it is Mr.
Schupp’s lot when the contract is in force. Administrator Tucker added that if they are paying to
park and it is something that can be parked, it can be parked there.
As far as a recreational vehicle being parked there, the City has an ordinance prohibiting people
from living in them on the island.
Once the parking lot reverts to the City, and the City does not store any type of vehicle.
Administrator Tucker recalled for the Committee that it had discussed the possibility of using the
municipal lots in the off-season for storage and the Committee had decided against it.
6. New Business – None
Real Property Committee
October 3, 2013
Page 11 of 11
7. Executive Session - not needed
8. Miscellaneous Business
Tenant Rents Report
Administrator Tucker stated that everyone is up-to-date on monthly rents with October rent due
on the tenth of the month. Morgan Creek Grill still owes the balance of their additional rent; they
have made a partial payment. TidalWave Watersports has paid their rent through March 2014.
Next Meeting Date: 5:30 p.m., Monday, November 4, 2013 in the Conference Room.
9. Adjourn
MOTION: Councilmember Buckhannon moved to adjourn the meeting at 7:20
p.m.; Councilmember Loftus seconded and the motion PASSED UNANIMOUSLY.
Respectfully submitted:
Marie Copeland
City Clerk