Planning Commission Regular Meeting Agenda

City of North Myrtle Beach · Horry County · meeting of Nov 10, 2026 · Agendas

Open the original document More from City of North Myrtle Beach

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PLANNING COMMISSION MEETING AGENDA Tuesday, November 10, 2026, 5:00 PM in Council Chambers Morning Workshop at 9:15 AM in Planning & Development Conference Room URL: https://www.youtube.com/watch?v=147Cp8vqba0 1018 2nd Avenue South, North Myrtle Beach, SC 1. CALL TO ORDER 2. ROLL CALL 3. COMMUNICATIONS 4. APPROVAL OF MEETING MINUTES: 10/20/26 5. OLD BUSINESS A. ANNEXATION & ZONING DESIGNATION Z-26-19: City staff received a petition to annex ±2.00 acres on Water Tower Road id entified by PIN 348-02-04-0002. The lot is currently unincorporated and zoned Commercial Forest Agriculture (CFA) by Horry County. The petition also reflects the requested City of North Myrtle Beach zoning district of Highway Commercial (HC) and will be heard concurrently. B. REVISED REZONING REQUEST Z-26-14: The Planning & Development Department is reviewing a revised request to rezone four parcels located on Pointe Marsh Lane containing ±0.96 acres, PINs 351-16-02-0025, 351-16-02 -0026, 351-16-02-0030, and 351-16-02-0032, from Highway Commercial (HC) to Medium Density Residential (R-2). The original request included six parcels. PINs 351-16-02-0029 and 351-16-02-0031 have been removed from the request. No change to the existing HC zoning of those two parcels is proposed. C. MINOR PLANNED DEVELOPMENT DI STRICT AMENDMENT Z-26-13: City staff received an application for a minor amendment to the Robbers Roost Planned Development District (PDD) to extend an existing privacy fence around the neighborhood amenity area and adjacent park. D. MAJOR PLANNED DEVELOPMENT DI STRICT AMENDMENT Z-26-20: City staff received an application for a major am endment to the Parkway Group Planned Development District (PDD) to allow a 43-unit garage development for vehicle storage and related clubhouse, car shows, social events, and food trucks. 6. NEW BUSINESS A. LAND DEVELOPMENT REGULATIONS TEXT AMENDMENT STX-26-2: City staff has initiated a text amendment establishing standards for the preparation, review, and required mitigation of transportation impact analyses associated with development. B. ZONING ORDINANCE TEXT AMENDMENT ZTX-26-12: City staff has initiated a proposed text amendment to establish zoning provisions for commercial drone facilities, including definitions, permitted locations, approval requirements, and land-use and site- development standards (withdrawn by staff). C. ZONING ORDINANCE TEXT AMENDMENT ZTX-26-13: City staff proposes amendments to the Zoning Ordinance concer ning boarding houses , including related definitions, permitted zoning districts, an d applicable use standards (staff requested postponement). D. PRELIMINARY SUBDIVISION PLAT SUB-24-38: A major preliminary plat establishing Farmhouse Circle within a 66- foot private right-of-way throug h seven existing parcels and creating three additional nonbuilding conservation remnants, for a total of ten parcels, on approximately 239.44 acres off Atlantic Breeze Drive. E. FINAL SUBDIVISION PLAT SUB-26-58: A major final bonded plat of subdivision creating 111 townhouse lots, three open space lo ts, and private rights-of-way in Phase 4 of Grande Dunes North. F. FINAL SUBDIVISION PLAT SUB-26-61: A major final bonded plat of subdivision creating 12 residential lots and private rights-of-way in Phase 6A of Grande Dunes North. 7. PUBLIC COMMENT 8. ADJOURNMENT Respectfully submitted, L. Suzanne Pritchard, PLA, AICP, CFM Assistant Director, Planning & Development Anyone who requires an auxiliary aid or service for effective communication or participation should contact (843) 280-5555 as soon as possible, but no later than 48 hours before the scheduled event. Notice to the Public of Rights under Title VI: The City of North Myrtle Beach operates its programs and services without regard to race, color, and national origin in accordance with Title VI of the Civil Rights Act. Any person who believes he or she has been aggrieved by any un lawful discriminatory practice under Title VI may file a complaint with the City of North Myrtle Beach. Complaints must be filed within 180 days of the alleged discriminatory act. If information is needed in another language, contact (843) 280-5555. ~Si se necesita información en otro idioma llame al (843)280-5555. 1 CITY OF NORTH MYRTLE BEACH, SOUTH CAROLINA NORTH MYRTLE BEACH CITY HALL PLANNING COMMISSION MEETING Tuesday, October 20, 2026 5:00 PM M INUTES Silvio Cutuli, Chairman City Staff: Ty Bellamy Suzanne Pritchard, Asst. Director Harry Oehler Amber Elmadolar, Plan Reviewer/GIS Tech Joe Gosiewski Ed Horton, Absent Ed Prince Emily Broome, Plan Reviewer/GIS Tech Chris Noury, City Attorney Allison Galbreath, City Clerk Callie Jean Wise Angela Westmoreland, Asst. City Clerk 1. CALL TO ORDER: Chairman Cutuli called the meeting to order at 5:00 PM. 2 . ROLL CALL: The City Clerk called the roll. A quorum was established. 3 . COMMUNICATIONS: None 4 . APPROVAL OF MEETING MINUTES: The motion to approve the minutes for September 22, 2026, October 6, 2026, and October 7, 2026, was made by Commissioner Gosiewski and seconded by Commissioner Prince. Chairman Cutuli called for a vote. The motion passed 6-0. 5 . OLD BUSINESS: A. MINOR PLANNED DEVELOPMENT DISTRICT AMENDMENT Z-26-22: City staff received an application for a minor amendment to the Parkway Group Planned Development District (PDD) for drone facilities at an existing fulfillment site. Suzanne Pritchard, Planning and Development Assistant Director, read the item by title, gave a brief history, the Applicable Standards, and the Alternate Findings of Fact. She noted that she had provided copies of correspondences opposing the passing of this item (Exhibit A) and those also would be added to the meeting minutes. Assistant Director Pritchard stated the decision concern ed the suitability of the proposed facility at this location. It d id not establish drone delivery was inappropriate throughout the city or prescribed flight routes, altitude, aircraft specifications, or operating procedures . She noted that Section 23-29 permits minor changes disapproved by the Planning Commission to be resubmitted for legislative consideration as a major change. Assistant Director Pritchard gave an overview of the Alternate Findings of Fact. A lternative findings of Fact: 1. Nature and scope. The amendment establishes an approximately 13,627- square-foot fenced drone paddock and an interior operations area at the existing fulfillment and distribution center. It does not add a principal building, expand the developed footprint, increase impervious surface, or change access. Those characteristics limit the physical construction associated with the amendment. They do not establish that the proposed activity would have the same intensity, geographic reach, or relationship to surrounding uses as the existing operation. The Commission therefore, evaluates the facility’s intended function together with its physical improvements. 2. Documented experience in other communities. Experience with Amazon Prime Air operations demonstrates that recurring neighborhood disruption is a foreseeable concern. Richardson, Texas, 2 reported in March 2026 that community concerns included frequent noise and flight paths, and that Amazon subsequently adjusted certain routes and outbound flight altitudes. September 2026 reporting documented continuing resident complaints about repeated overflights and disruption of neighborhood quiet. Amazon disputed the characterization of its noise impacts and described its noise-reduction efforts. College Station’s June 2024 public meeting summary likewise documented the Council’s opposition to expansion until a more appropriate location and sound mitigation addressed impacts on nearby residents. These experiences involve different locations and operating circumstances. The Commission considers them evidence of potential impacts requiring evaluation, rather than proof that identical conditions would occur in North Myrtle Beach. 3. Relationship to and consistency with the Comprehensive Plan. The Comprehensive Plan connects economic sustainability with protection of natural resources, community livability, and sense of place. Goal 8.1 and Strategies 8.1.2 through 8.1.4 call for protecting environmentally sensitive lands, maintaining residential quality of life, and minimizing potentially harmful environmental and ecological impacts. Goal 9.1 supports high -quality jobs and positive economic activity, while Strategy 9.1.1 calls for addressing conflicts affecting economic growth and neighborhood development. The Plan also identifies the importance of environmental quality and community character to the City’s tourism economy. The Commission acknowledges Amazon’s description of approximately 12 additional jobs and the proposal’s reuse of developed pavement. However, the Commission gives greater weight to protecting residential quality of life and the environmental and community characteristics supporting the City’s established economic base. Considering the documented community experience described in Finding 2 and the compatibility concerns described in Finding 4, the Commission finds that the proposal’s benefits do not outweigh the reasonably anticipated risk of recurring disruption. The Commission therefore finds the amendment inconsistent with those protective Plan objectives. This is a prospective planning judgment, rather than a finding that wildlife injury or tourism losses have already occurred. 4. Appropriateness and compatibility. The proposed facility occupies an established industrial site, and the ground improvements would be substantially screened from public rights- of-way. Approximately 1,200 feet separate the proposed facility from the nearest planned residential development and approximately 2,200 feet from existing residential development. These distances and the industrial setting are favorable considerations. However, the documented experience described in Finding 2 demonstrates that the effects associated with a drone -delivery hub can extend beyond its ground enclosure into surrounding neighborhoods. The Commission consequently does not consider screening and separation distances alone sufficient to establish compatibility. Applying that experience to the nearby residential development and the facility’s intended recurring delivery function, the Commission reasonably anticipates a risk of repeated disturbance extending beyond the industrial site. It finds that risk incompatible with the PDD’s stated objective of maintaining separation from surrounding residential communities and the compatibility objectives of §§23-29(5) and 23- 29(6)(a)1. 5. Public facilities and services. The amendment maintains existing access and creates no additional impervious area or material stormwater changes. Remaining parking satisfies the approved PDD standard despite removal of 24 spaces. Departmental conceptual review identified no deficiency precluding approval at the site-amendment stage. The Commission acknowledges those favorable findings and does not base denial on an established parking, access, drainage, utility, or fire-code violation. Those findings do not independently resolve the Plan -consistency and compatibility concerns identified above. 6. Basis and scope of decision. The Commission disapproves the amendment as submitted based on its Comprehensive Plan and compatibility findings. The decision concerns the suitability of the proposed facility at this location. It does not establish that drone delivery is inappropriate throughout the City or prescribe flight routes, altitude, aircraft specifications, or operating procedures. Section 23-29(7) permits minor changes disapproved by the Planning Commission to be resubmitted for legislative consideration as major changes. 3 A ssistant Director Pritchard added that the Amazon Representative was in attendance and he had stated Amazon would prefer a postponement to provide more information about the airspace concerns that the community had voiced. Commissioner Gosiewski stated that there had been 3 workshops and nothing would change with more workshops so it was time to vote yes or no. Commissioner Wise stated she had no more questions and added that Amazon lost an opportunity to offer more input by not attending the morning workshop. M ike Lindberg, Amazon Representative , stated he did not receive an invitation to attend the workshop and was available by phone. Commissioner Prince stated it was publicly announced there was a workshop and normally requestors attended to answer questions and Mr. Lindberg did not need to be invited. Chairman Cutuli stated the Commission was specifically dealing with ground use of the Amazon site and drone flight was within FAA jurisdiction. Chairman Cutuli added the Commission had nothing to guide them concerning ground use for drone ports and suggested another workshop for staff to bring back more information. Commissioner Prince stated there was no precedent for a drone launch facility anywhere is the City’s history and therefore, this was a new issue. He added he did not think this could be a minor amendment and should be a major amendment. Commissioner Oehler stated postponing this any further would not help . He added that the Amazon Representative not being present at the morning workshop concerned him and no invitation was needed. Commissioner Oehler stated Amazon was aware there had been 2 meetings and a workshop and should have been present. He added he was also concerned that community engagement was the last thing Amazon went for and it should have been done upfront. Commissioner Oehler stated the Commission was voting on land use that could have detrimental effects and he thanked the residents that sent letters and emails. Commissioner Wise stated she was done talking about drones. Chairman Cutuli opened the floor for public comment and went over rules and procedures for public comment. L isa Vitalo, 2607 Elowen Lane, Longs: North Myrtle Beach is where we pay our taxes. And we are located directly across Route 31 off of Water Tower Road in Grand Dunes North Village. Thank you. I don't know who's familiar with Grand Dunes North Village, but it is a new home community of approximately 1,000 homes being built by Ryan. About half of those homes are now complete, and it is located only a couple of miles across 31 from the Amazon Fulfillment Center on Water Tower Road. Over the past few days, a few of my neighbors and I have gone door to door throughout our neighborhood to ensure that all neighbors were aware of Amazon's proposal to establish a drone delivery operation practically in our backyard. I only knew about it because I am a member of a North Myrtle Beach Facebook group, and I saw a post about it, and then I started to research, and it took off from there in a matter of a few days. I'm very upset by the fact that had I not come across that Facebook post, I would not be aware this was happening, and in speaking with almost every neighbor in my neighborhood, nobody knew. That's kind of unacceptable in my opinion. Despite North Village being only about half built, and despite many of our homeowners living here only part -time, three of us were able to collect approximately 300 signatures opposing this proposal in just three days. And this is important for you to hear, because of all of the homeowners we personally approached, only four declined to sign the petition, and not one of those four indicated their reason for not signing the petition was because they were in support of this. They had other personal reasons for not signing. This should tell you something about the level of concern in our brand-new community. The reasons that my neighbors signed this petition against this proposal were many and varied. We are concerned about noise. We are concerned about the effects of repetitive overhead drone traffic on residents, pets, and wildlife. We are concerned about our property values. We are concerned about what introducing a high -volume commercial drone operation so close to established residential neighborhoods will do to our quality of life. If this facility ultimately handles as many 4 as 1,000 deliveries a day, realize what that means. That's 2,000 departures and arrivals in less than a 24-hour period. However, the most important issue of all is safety. Questions regarding how Amazon's drones are immediately cleared from an airspace when a medical helicopter, firefighting aircraft, law enforcement aircraft, or other emergency aviation resources are in need of dispatch need to be answered prior to this proposal receiving approval. This truly can be a matter of life or death, and who controls that decision? How is that drone removed from the flight path immediately and safely? Additionally, it is not difficult to find videos online where Amazon drone deliveries have gone dangerously wrong. There is a growing risk of vehicle collision, property damage, battery fires, which are extremely difficult to extinguish as they don't require oxygen to burn. The potential for danger to people and vehicles below these drones should the flight abort, is not worth the convenience of a one-hour delivery. Honest to God, unless it's something that's going to be lifesaving, I don't see how this is needed. Dana Brown, 2314 Vera Way, Longs, stated: I do have some new material for you tonight. This could be added to your finding. In fact, I believe that granting the requested zoning amendment for this particular location, which would then result in large -scale drone operations, poses a unique danger to the public due to its geographic location right next to 31. That is our only north -south freeway in the area. I think this will be a dangerous distraction to drivers and cars speeding by at 65 miles an hour when these very large drones are launched 100 feet right up on the freeway high, and then they sail over 31 at 100 to 200 feet to their delivery locations. The launch pad looks to be sandwiched in on two sides by no-fly zones, and the drones will need to cross 31 to make all their deliveries, maybe up to 1,000 times a day. And I don't think we can believe what they say. Amazon says their MK-30 drone only goes up to 68 decibels, but that's not what's on the FAA's own website. So, the FAA hires a company called Environmental Science Associates to do their sound studies. The report on Amazon's MK -30 drone, dated September of last year, actually says that on takeoff and landing, when it's going vertically 100 feet, it is between 80 and 90 decibels. That's quite a difference. Amazon did say their drone personnel has to wear ear protection. So, decibels are important because they're measured in their logarithmic. They're not linear. So, the difference between 68, 69, and 70 decibels is not just a little. It's multiples. So, an extra 10 decibels is actually double the sound that we hear. 80 to 90 decibels is equivalent to a lawnmower or a motorcycle, not the sound of a dishwasher or electronic toothbrush, as Amazon had said before. Imagine the sound of a lawnmower or a motorc ycle buzzing your house all day. We had two different meetings with two different Amazon reps in the last month, and both reps gave very significant conflicting information about what operations they would actually be conducting, if granted the zoning amendment. One said they would be doing both single-family and multi-family homes, would be eligible for delivery, and they would likely have flights over the Strand in some areas. The other one said only single -family homes and no flights over the Strand. One said it would bring about a dozen jobs. The other one said I think six jobs. One said twilight hours, which is 30 minutes before sunrise all the way through to 30 minutes after sunset. However, I found a report online for Amazon FAA in Omaha, Nebraska, referencing night operations from 10 PM to 7 AM. Does Amazon want to do that here once they get started? I believe that, well, the other thing that's kind of important is, let's see here, sorry about that. I found it really insulting that Amazon told us if we have a complaint to call their 800 number. That's the one on the website. Oh, sorry about that. Well, anyways, thank you for listening, and the FAA has actually said it's not up to Amazon. FAA says it's between the company and the city to take care of the community concerns. So, I'm not sure we're getting the right story on that. Thanks. T ristan Goode, 2181 Maserata Loop, Myrtle Beach, stated: I'm just south of this facility, and the earlier speakers did a great job of covering all my points, but I do think there is one that wasn't maybe covered, and that is residents in all impacted areas deserve a meaningful input and appropriate protections. So many residents specifically chose these neighborhoods and paid a premium for their homes because of the peaceful environment. I ask you to imagine these drones flying over your backyard hundreds of times a day if you're in the flight path, which many of these neighborhoods are, and as you're relaxing 5 on your lanai, trying to enjoy your pool, grilling dinner, or entertaining friends and family, would you consider that an acceptable intrusion into your quality of life? So, I'm asking you today not to postpone this and basically don't approve it. Just because something can be done doesn't mean it should be done. Thank you. St eve Shannon, Crested Iris Way, North Myrtle Beach, stated: As I've told the Council, my wife and I for the last two and a half years here, we're living our dream. I've sat on that dais, not this one, another one, as a C ommissioner and as a T own Councilman, so I know what you're going through, and I can appreciate and respect having to make decisions. I think one of the best decisions you can make is to pass this on to the Town Council because it's big. It doesn't affect a few. It affects everybody in this town. I am not opposed to progress. I truly am not. I'm opposed to it when it benefits a few and not the masses. I know y'all were talking about you're ready to vote on it, and I know you're talking about postponing it. I just wish you'd keep in mind I understand you are voting for the pad, not the drones. But like from a old movie, if you build it, they will come. Thank you. T homas O’Leary, 2368 Vera Way, Longs, stated: Mr. Harry Oehler brought up a very valid point that there's no precedent for this type of operation in North Myrtle Beach. Is there a precedent anywhere else in South Carolina or North Carolina, anywhere in the states? And maybe the gentleman from Amazon can help. Co mmissioner Oehler stated there were none that he was aware of. Chairman Cutuli stated that in t he research he found, there were no drone facilities in South Carolina, but there were others in other states. He added they did exist, but not in South Carolina. T homas O’Leary: Anyway, second thought, I'm not against progress. I think we have to do it the right way, especially technology. We all use it. Everyone's using it right now. Anyway, great turnout. Excellent. J ohn Ferrie, 2241 Waterview Drive, North Myrtle Beach, stated: You guys want something new? I'll give you something new. In fact, it's so new I got it at 3:53 this afternoon, if you'll indulge me a little bit. My friend that stayed at my house the other day from Texas showed me this video of a drone delivering package from Amazon to his neighbor. He says the drones go over his house every ten minutes, and it's as loud as you can see, I guess he meant hear, in the video. I thought you might be interested in seeing this. Do you mind if I play it? (PLAYED AUDIO). Because the one thing we haven't heard, the new thing, is what do these things sound like when they're overhead? I thought we were going to have some -- I was here at the October 9th workshop, and I thought two things were going to happen. We were going to get a synopsis of all that information that we got. Some gentleman stood up and asked for it, and it was all agreed to, all happy, happy. I didn't see nothing. And here's the other thing. The gentleman from Amazon said they take care of liabilities like when they back over a mailbox, they take care of it. What are they going to do if one of their perfect drones, perfect mechanical device, perfect electronic device, perfect AI device lands o n somebody? I bet you, they're going to have a whole bunch of lawyers with a whole bunch of money defending any lawsuit against them. But here's the new thing. How would you like that coming down on your neighbor's house every day while you're trying to sit there enjoying your quality of life? You're being asked to just approve concrete, laying concrete? No, you're being asked to begin the process of destroying the quality of life around here. Don't do it. R obin Stuebing, 5310 North Ocean Boulevard, North Myrtle Beach, stated: I'd like to thank you for the opportunity to talk about this. One of the things that we haven't really talked about in addition to all the noise that it brings, specifically what you just heard, is the people that live here, the people that visit here, veterans, PTSD. We haven't heard that at all. I did a little reading, did a little research, and it absolutely causes PTSD issues with those that suffer from that already. It's called a hornet auto trigger, and it also causes drone phobia. 6 It causes the sound of helplessness and hypervigilance. Where I live at 5310 North Ocean, we have a quiet building. We live close to the point. And we have several veterans that come every year because we are a quiet building. I can't imagine being someone that has been a combat veteran, surviving it, and trying to live your best life, and all of a sudden having to hear this and have to recall what they've already lived through. We also have refugee families and children that live here, and I think that that's very significant. We have lots of Ukrainians that live here. And I think having to hear that constant sound that he just played would be detrimental. I think we would lose more people coming here and living here than would ever come back. And I just want to add one thing about the environment. I don't know if anybody knows, but Myrtle Beach is a Monarch butterfly area that comes when they're migrating, and that would decimate our Monarch butterfly system. And we need butterflies, the beautiful yellows. I looked up lots of birds that this would absolutely cause to go away. And I think that's very important for our ecosystem. They depend on us, and we depend on them. But aside from that, the PTSD should be number one thought in the minds of this. Wendy Fahrenhold, 2266 Hazel Way, North Myrtle Beach, stated: First, I'd like to finish Lisa's paragraph because she had one more. Basically, she said, we're being asked to accept these risks so that a package can arrive more quickly. Convenience is not worth compromising the safety, peace, and quality of life, the people who call this community home. We don't need this. We don't want this. We're asking for a no on this proposal. Thank you. And then, and so now I'm flipping to me. The previous speakers have addressed many of the specific concerns, so I would like to make one central point. The proposal would intrude directly into residents' privacy, safety, and quality of life. Our homes should be places where we can expect peace, privacy, and a reasonable sense of control over our surroundings. We should not have to look up from our backyards, patios, or windows to see commercial drones routinely flying overhead. Residents should not be expected to tolerate constant noise, activity, or uncertainty above their homes simply because a corporation wants to expand its delivery operations. There are appropriate locations for this kind of activity. Please listen to the residents who will have to live with the consequence of this decision every day. Thank you. D avid Pizzino, 2608 Elowen Lane, Longs, stated: I'm going to bore you today, but I'm going to bore you with some statistics and numbers, and that's my purpose today is to let you think about what this is going to do to Grand Dunes North Village. Statistically, they're saying 1,000 flights per day. That's taking off to deliver packages. Statistically, there's a 25% chance of going east, south, west, north. That puts us directly in the path of 25% of those flights. That amounts, for those number of flights, is approximately 350,000 flights per year. 350,000 leaving that facility. 86,750 of those flights will come over our neighborhood every year. That's not fair to us. It's not fair to any community to have that kind of noise and traffic over our development. At 99% error -free, and by error-free, I'm not talking about packages being dropped. I'm talking about flights that do not crash. At 99% error-free, that amounts to 857 accidents per year. At 99.99999%, that's five nines after the 99, that amounts to one accident. There's no way they can significantly tell us that they're going to have 99. 99999% ability to not have accidents. That amounts to two accidents per year at that statistic. I'm going to tell you that I'm statistically trained by General Electric in a program called Six Sigma, which is an analysis program that we were forced in my c areer to study and to perform every year. I'm wondering what statistical analysis and data they are going to provide once they start taking off their flights. I'm sorry I bored you with those numbers, but those are the real facts of what's going to happen to our neighborhood. K en Tierney, 2508 Elowen Lane, Longs, stated: I've heard a bunch of eloquent speeches here tonight, and very well put, and I hope you guys really take it to heart. One of the shocking things that I find myself with is if these decisions are made. You guys approved the developments to be created and then made decisions even before the people showed up, and we still are not at full capacity. I'm just curious when you 7 guys are going to include the community before some of these decisions really get made. We're the ones that have to pay the price. That's really all I got, but I wanted to mention that. P am Gibson, 2609 South Ocean Boulevard, North Myrtle Beach, stated: I’m here again, One thing that we haven't talked about is, and the Amazon representative may be able to help me with this, I have found that the drone itself weighs 88 pounds. Is that correct? M ike Lindberg stated: It's 83 pounds fully loaded. That includes the package. P am Gibson: 83 pounds fully loaded. Okay, thank you. Okay, all right, so 83 pounds falling from the sky. Also, I've also read, whether it's true or not, I'm hoping, I'm believing it's true, that there is a camera on it, and that camera, as that drone descends, can pick up a dog in the yard, a small child in the yard, or a car in the yard. A car license plate. I know you don't read them, but can that camera pick up those things? As it descends to drop that package, it has to, that 18 -foot area. M ike Lindberg: Actually, since I'm sure there's probably several people here that were not at the workshop that we presented at two weeks ago, once we're finished with the comments, I'd be happy to provide that presentation again if folks are willing to have a few minutes for me to do that. P am Gibson: No, I just want you to answer that question. M ike Lindberg: Sure, the system you're talking about is our perception system. The perception system is a camera that's on the rear of the drone, when it's flying in forward flight, that camera is not facing the ground. So again, we're flying at between 200 and 300 feet, typically, and when we're in forward flight, we do not have any downward-facing cameras on the drone. However, when the drone is coming to its delivery point, for that customer who has requested that drone come to their property, those cameras are facing directly, pointing straight downwards. So it is, again, sensing for safety reasons to make sure that, like, my children were out playing in the yard, that no one gets too excited, wants to go try and catch a package, or if the dog is in the backyard, or if today you happen to have your car parked in that location on your driveway. It is sensing to make sure that there's no obstructions there for safety reasons, and if it does sense that, then the drone will cancel that delivery. But these cameras that are on our drone, they are only there for safety and navigational purposes. We are not reading license plates, identifying individuals. These are not surveillance devices. These are not flock cameras. These are for safety and engineering and navigation purposes only. P am Gibson: Thank you for answering that. So, with that, I rest my case. P atricia Purcell, 2304 Elowen Lane, Longs, stated: I have a lot of concerns. For one, I'm glad that he played the sound of it, because the sound of that buzzing, it affects me personally, and I'm sure it affects a lot of people that have medical conditions, but I have a very serious case of fibromyalgia, and that is what plays on y our nerves. And just when he played it, it automatically hit the nervous system, and that's vital. That is something that really needs to be addressed as far as safety. The other concerns that I have are, we don't live near an airport. We live further away from the airport for that reason, so we didn't have to hear the planes going over and so forth. Another thing is what about the young kids that are driving, delivering packages, and what about jobs for the young kids in the 8 community? They look forward to having something to do in between school, high school, college. They'll need jobs, and this could replace them. So even Bill Gates says that AI is not 100% perfected, and I think this is just another way of getting rid of human beings to make deliveries. And it's very important that he did specify specifically that it is not 100% safe, and that is a very big safety issue. If you get with him, you'll notice he has notes in his office and so forth. So, there was a whole big thing on that. And also the failures. What if the drones fail? I mean people can get hurt, if not even hurt, they can get killed. These are very big, 80 pounds. Did you say 80 pounds? That's substantial. Could you imagine? We walk, my husband and I walk every single day, and I can't even imagine a drone going over my head. I would be so stressed out. And I'm walking to decrease my stress, not enhance it. And I think that hearing this buzzing going on around in the neighborhood would just really hurt a lot of people physically and mentally. And again, some of the other stuff was said. And what about Falcon SpaceX? I mean when we see these beautiful rockets going across outside, and would it have some kind of an effect? Would they change their flight pattern? Will they change the beauty of all of this thing that they're doing with space now and shooting off all of these rockets? That's a big thing. That's huge to our economy right now and to our world. And so, I think that that's another really big thing. Also, the stress levels, I can't say it enough. With the fibromyalgia, with CRPS, those are very serious diseases that people have. It's a nerve disease, and it's very painful. Co mmissioner Wise reminded everyone the issues that had already been talked about were quality of life, safety, highway safety, health issues, veterans, PTSD, noise pollution, less jobs, the environment, and wildlife. W ayne Schneider, 8804 Brynlee Road, Longs, stated: I'm a licensed drone pilot. I have been for eight years, and I've had over 500 flights myself, $100 of flying time, and I've crashed drones. I've had drones. I've run my drone into things. They have collision avoidance, doesn't always work, still hit things. I've had interactions with wildlife. One of my drones was taken out of the air by an osprey, which I didn't know was in the area. Fortunately, the bird survived. My drone did not. I've also had incidents of what's called flyaway, when your drone takes off on its own and it has a mind of its own. You have to try and get it back under control. Sometimes you can. Sometimes it disappears. I don't know if it's going back to China or if it's just running out of battery and falling somewhere. These things do happen. I had an incidence of a flyaway where, fortunately, I managed to regain control of my drone before it flew onto a highway, interstate highway, and crashed into a vehicle, semi or something, that could have seriously caused a major collision on a major interstate highway up in the Cleveland area up along Lake Erie. So, accidents do happen. There is nothing that's fail -safe. These drones are also flown autonomously, which means they're programmed for their flight. So, when the FAA put in allowing autonomous flights, it was not for, I'm going to pick on Amazon because you're it, it was for survey purposes, railroads, utility companies that had to be able to do inspections on utility lines and railroad lines that was difficult for them to manually get a person into and for a person to fly a drone and to still be able to see it, which was the old law. Now the FAA, which does a great job in setting regulations, did a good job, but they kind of missed it a little bit on this one. By allowing these things to happen, now they're allowing these other things to happen, UPS, Amazon, Walmart is going to be Walgreens next, CVS, who else is going to want to do drone deli veries? So, like I said, I think I'm the only licensed drone pilot here, so if you have any questions, feel free to ask. Thank you very much. J anet Miller, 2317 Vera Way, Longs, stated: Thank you for allowing us to speak on behalf of our neighborhood and the betterment of our community today. My husband and I are both here tonight. I just have three points. My first point is there's a time and place for drones. I say this because my son utilizes a drone for his work. He is a police officer in the city of Philadelphia. It is mainly for safety reasons, and I truly believe that's the biggest point of having a drone, not for this type of purpose. Number two, my husband was HOA president for over 21 years for 750 homes back in our old hometown in the 9 Philadelphia region. When it comes to new things, and the newest thing that he had to manage was the thought of bringing in solar panels to our community. That was something we never thought we would have to think about or deal with in being in the Northeast, but it is obviously improvement and new technology. So, the day came a few years ago that the board was approached asking permission for solar panels to be added to people's roofs. The board of five people for 750 homes, they took several months, several months. They did not give an answer to these homeowners that requested these solar panels right away. They did their due diligence. They met with insurance companies. They met with developers. They met, you name it, realtors. They looked at every aspect of the pros and cons of having solar panels in our community because their job being a five -person board was for the betterment of the entire community, not just for several people. So, I do highly recommend if there isn't a precedent that has been made in this area for drones or in the state of South Carolina, all I know, this is something that if it's been approached to you or to North Myrtle Beach as a whole, to take those months, unless you're going to vote it down now, which I'm absolutely perfectly okay with, to do that due diligence. If you need someone that could do that, I vote for Dana Br own, who is sitting in the audience right now, because she does deep dives when it comes to things like this and is very involved in her community. One last note, and I don't know if everyone knows this in the audience, but I have been told that once something like this is approved, there's no way of turning back. Thank you. M ike Lindberg, stated: If you wouldn't mind, I would like to address a few of the safety concerns that have been brought up by a couple of the recent commenters. I do appreciate the concerns that have been brought up tonight. Appreciate your experience as a drone pilot. I'm not sure where you went but thank you for bringing that up. Appreciate your enthusiasm for drones. One of the things on that topic that I do want to call out is that Amazon's drone is approved under the Part 135 program with the FAA. This is very different than most people, whether it's recreational drones or whether those happen to be mostly commercial uses for drones. What that means, beyond the federal numbers there, is that our drone, everything from the engineering of the drone itself, the operations, the systems on board, are built and operated to the same safety standards as traditional aviation operations. So, we're talking about cargo jets and aviation along those lines. We are operating at the highest safety standards out there coming from the FAA. These are very different than the systems that either hobbyist drones or real estate photographers or even many of the use cases he mentioned, such as utility inspections, et cetera. The system that we have has a number of redundancies built into all of the systems, whether that be the rotors on our drones are able to operate if a rotor goes out. We're able to operate with multiple battery channels. The system's hardware are all redundant. So again, there is a much different safety standard for the drones that we operate. Again, with some of the concerns about our flight paths regarding things like life flight operators, other emergency operators, other aviation users, as a Part 135 operator, before our drones ever take off the ground, we need to receive airspace approvals from the FAA for every new operation we launch. This includes a r obust outreach program to all the other aviation users. We coordinate with the airports. We coordinate with those life flight operators. We have systems on board our drones, including our flight monitors, who are able to monitor the airspace. The drones are receiving input from where those other vehicles are in the air. We also have a detect and avoid system on board as another line of safety there, so that if the drone is flying in forward flight, again, the kind of cameras that were mentioned earlier, the point of those on the drones are to detect if there are any things like life flight helicopters or other operators in the area. And again, it's not completely autonomous as we talked about. We do have flight monitors that are in the loop at all times. They are able to also understand what is going on in the airspace, the weather, the flight routes, monitoring the situation for the drones. And again, they're able to command contingency operations as well. The last thing that I wanted to talk about is that concerns were raised about job loss. This is not a jobs replacement program. The facility that we run here, our last mile facility, delivers thousands of packages every day, far beyond the capacity of what our drones does. This is a supplemental program for additional customer service for fast delivery. It is really supplemental to the other services that we're already providing and adds additional jobs to the site, so it's a net positive for jobs at the site. Thank you. 10 Co mmissioner Wise thanked everyone for being respectful and asked that the same decorum be kept moving forward with the meeting. H aving no further comment from the Commission or the public, Chairman Cutuli called for a motion. Commissioner Prince motioned the Planning Commission adopt the proposed Alternative Findings of Fact contained in the staff report dated October 20, 2026, and deny Minor Planned Development District Amendment Z -26-22 as presented and was seconded by Commissioner Gosiewski. The motion to deny passed 6-0. 6. N EW BUSINESS: A. R EVISED ZONING ORDINANCE TEXT AMENDMENT ZTX -26-11: City staff has revised the proposed text amendment to allow a reduced rear setback for certain oceanfront food and beverage establishments in the Resort Commercial (RC) and Resort Residential (R-4) Districts, subject to applicable state beachfront jurisdictional requirements. Assistant Director Pritchard read the item by title, gave a brief history, the Applicable Standards, and the Proposed Findings of Fact. A pplicable Standards § 2 3-4. – Amendments, of the City’s zoning ordinance requires the Planning Commission to prepare a report and recommendation stating its findings and evaluation of a proposed zoning amendment. The Commission must consider the amendment’s relationship to the Comprehensive Plan; whether it supports or violates the Plan; the appropriateness of the uses affected; potential effects on public facilities and services; and consistency with plans for public water and sewer. Under § 23-4(4), favorable action must be based on necessity to implement the Comprehensive Plan; correction of a mistake or manifest error; recognition of changing conditions or circumstances; or recognition of changes in technology, style of living, or manner of doing business. Section 23-4(5) requires a Planning Commission public hearing, with notice of its time and place published in a newspaper of general circulation in North Myrtle Beach at least fifteen (15) days before the hearing. P roposed Findings of Fact 1. Procedural Compliance: The revised amendment includes both the RC and R-4 Districts and was advertised in the October 1, 2026, edition of the North Myrtle Beach Times for a Planning Commission public hearing on October 20, 2026. Publication occurred nineteen (19) days before the hearing, satisfying the minimum fifteen-day publication interval required by § 23-4(5). 2. Existing Regulations: Sections 23 -22(3) and 23 -27(3) establish rear -yard setbacks by use category but do not provide a separate rear -yard standard for qualifying oceanfront food and beverage establishments. The amendment would establish a zero-foot rear-yard setback for those e stablishments on lots abutting the Atlantic Ocean in the R-4 and RC Districts. 3. District Purposes: The RC District is intended to accommodate commercial uses and enhance tourist and visitor attractions within a compact development pattern. The R-4 District accommodates year-round, seasonal, and resort housing while maintaining ocean visibility and community access. Both districts allow food and beverage establishments subject to applicable requirements. The proposed amendment addresses a dimensional standard affecting commercial uses consistent with the districts’ purposes. 4. Relationship to the Comprehensive Plan: Guiding Principle 7 of the 2018 Comprehensive Plan, “Protect and Enhance the Waterfront Experience,” addresses waterfront commercial and recreational activity together with erosion and storm protection, adequate parking, public access, and resource management. The amendment advances the commercial component of that principle through targeted dimensional flexibility while retaining applicable coastal, access, parking, and development protections. 11 5. Appropriateness of the Amendment: The amendment is limited to food and beverage establishments on oceanfront lots within the R -4 and RC Districts. It modifies only the required rear zoning setback and does not change the uses otherwise permitted or conditionally allowed within the district. 6. Coastal Requirements: The zero-foot City zoning setback does not supersede applicable state beachfront jurisdictional, critical-area, permitting, or other coastal-management requirements. The amendment does not authorize encroachment onto adjoining property, public beach areas, rights- of-way, or protected access easements. Development within areas subject to state beachfront jurisdiction remains subject to the applicable state review and authorization process. 7. Public Facilities and Services: The amendment changes a dimensional development standard and does not itself authorize a new land use, increase permitted residential density, or approve development on any particular property. Additional food-service floor area or seating may increase traffic, parking demand, and demand for public services. Any development remains subject to otherwise applicable parking, building, fire, stormwater, and development requirements. 8. Water and Sewer: The amendment does not alter the City’s water or sewer service standards or g rant or guarantee utility capacity. Additional food-service floor area or seating may increase water use and wastewater flows. Development remains subject to applicable water and sewer service plans and utility availability, connection, capacity, and service requirements. 9. Support for the Comprehensive Plan and Policy Basis: The amendment provides targeted flexibility for otherwise authorized oceanfront food and beverage establishments in both resort districts, rather than applying general rear -yard requirements without regard to their oceanfront setting. This flexibility implements the Plan’s waterfront commercial objective while retaining applicable safeguards. On that basis, the Commission finds the amendment necessary to implement the Comprehensive Plan under § 23-4(4)(a) and finds that it supports and does not violate the Plan when considered together with the continuing coastal, neighborhood, parking, and public-access requirements. H aving no comment from the Commission or the public, Chairman Cutuli called for a motion . Commissioner Gosiewski motioned the Planning Commission adopt the Findings of Fact contained in the staff report dated October 20, 2026, and recommend approval of Zoning Ordinance Text Amendment ZTX-26-11 to City Council as submitted, applying the standards identified in the report and was seconded by Commissioner Oehler. The motion to approve passed 6-0. B. M AJOR PLANNED DEVELOPMENT DISTRICT AMENDMENT Z-26-20: City staff received an application for a major amendment to the Parkway Group Planned Development District (PDD) to allow a 43-unit garage development for vehicle storage and related clubhouse, car shows, social events, and food trucks. Assistant Director Pritchard read the item by title, gave a brief history, the Applicable Standards, and the Proposed Findings of Fact . Commissioner Bellamy asked if there were enough parking spaces outside. Chairman Cutuli stated this was a private venue and not open to the public. Assistant Director Pritchard stated there were 10 spaces behind the gate and 20 in front. Commissioner Bellamy asked if these would be rented and Assistant Director Pritchard stated they were to be purchased. Commissioner Wise stated one of her concerns was the cartoonish painting on the outside because it might encourage racing on Highway 31. She added she would like for the applicant to submit different elevations. Commissioner Gosiewski stated the only issue he had with the checkered flag elevations was that it resembled the old Myrtle Beach Speedway. Commissioner Oehler inquired about signage . Chairman Cutuli suggested postponing approval pending more information. Commissioner Oehler stated he would like the Applicant to attend the next meeting to answer questions. Discussion continued. H aving no further comment from the Commission or the public, Chairman Cutuli called for a motion. Commissioner Bellamy motioned the Planning Commission postpone Major Planned Development 12 District Amendment Z-26-20 to the next meeting to allow the Applicant time to revise the elevations and was seconded by Commissioner Oehler. The motion to postpone passed 6-0. C. MAJOR PLANNED DEVELOPMENT DISTRICT AMENDMENT Z-26-26: City staff received an application for a major amendment to the North Beach Plantation Planned Development District (PDD) to replace the one hundred and twenty (120) unit Phase III Tower with 14 single- family detached dwelling units with parking beneath. Assistant Director Pritchard read the item by title, and stated Staff was requesting to postpone due to multiple issues that had been identified through the Technical Review Committee that need ed to be completed and evaluated prior to moving forward. Having no comment from the Commission or the public, Chairman Cutuli called for a motion . Commissioner Wise motioned the Planning Commission postpone Major Planned Development District Amendment Z-26-26 until the Applicant submitted revised plans and a response narrative addressing the outstanding Technical Review Committee comments and staff completed review of the revisions and was seconded by Commissioner Bellamy. The motion to postpone passed 6-0. 7. PUBLIC COMMENT: Co mmissioner Gosiewski stated: At the last workshop, some very ugly and rude comments were directed at Assistant Director Pritchard and they were ugly and they were rude and they were uncalled for. And people don't understand what a contribution she's made to the city of North Myrtle Beach and Planning . Streetscapes, the Arts Commission, the tree survey where we are protecting trees that were never ever protected before, as well as many other things. And I just think it was rude and uncalled for. Commissioner Wise stated: I think this brought to our attention that unfounded and baseless accusations going forward will not be tolerated as a public comment in this forum. Connie Millman, 701 First Avenue South, North Myrtle Beach, My concern is more building, more building. I went down to visit on 18th North and Hillside. I've been watching eagles there give birth to their babies for three springs. That lot is empty. Completely empty. No trees, nothing. Eagle’s nest is gone. That's a Federal penalty punishable by up to $200,000. I am reaching out because it makes me sick. But let's just keep building. So, when you brought up her saving trees, please! 8. ADJOURNMENT: Chairman Cutuli called for a motion to adjourn the meeting. Commissioner Bellamy motioned to adjourn the meeting and was seconded by Commissioner Oehler. The motion to adjourn passed 6-0. The meeting adjourned at 6:29 PM. R espectfully submitted, An gela C. Westmoreland Assistant City Clerk NOTE: BE ADVISED THAT THESE MINUTES REPRESENT A SUMMARY OF THE PLANNING COMMISSION MEETING AND ARE NOT INTENDED TO REPRESENT A FULL TRANSCRIPT OF THE MEETING. 1 Pritchard Suzanne From: Colleen Brink Sent: Friday, October 9, 2026 11:14 AM To: Pritchard Suzanne Cc: Wood, Jim; Hank Brink Subject: Formal Opposition to Amazon Drone Delivery Facility Z-26-22 / TRC-26-24 Please forward this correspondence to all seven members of the North Myrtle Beach Planning Commission, including Chairman Silvio Cutuli, and include it in the official public record concerning Amazon's proposed drone delivery facility at 8651 Water Tower Road. We request confirmation that this was sent and receipt by all Planning Commission members. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ~~~~~~~~~ Dear Members of the North Myrtle Beach Planning Commission, My husband and I are writing to express our strong opposition to Amazon's proposed drone delivery facility on Water Tower Road. We recently relocated to South Carolina and purchased a newly constructed home in Marshfield by Beazer Homes, in the Longs/North Myrtle Beach area. Like many of our neighbors, we chose this community because of its peaceful residential setting, attractive surroundings, and the opportunity to enjoy a relaxed lifestyle in our retirement years. We have invested a significant amount of our savings into our new home, with every expectation that we would be able to enjoy the quiet surroundings, our outdoor living spaces, and the natural beauty that attracted us to this area. The prospect of Amazon operating potentially hundreds of drone flights daily is deeply troubling to us. We are within the 7.5 mile proposed dilivery service area. Our concerns are not simply about resisting new technology. We recognize that innovation can bring benefits. However, we strongly believe that commercial convenience should not come at the expense of the quality of life of residents who have made substantial investments in their homes and communities. In particular, we are concerned about: • Noise and disruption: The possibility of repeated high-pitched drone noise throughout the day, disturbing the peace and quiet of our neighborhood and our ability to enjoy our screened porch and outdoor spaces. • Safety: The potential for mechanical failures, crashes, and emergency landings in or near residential communities. • Privacy: The possibility of drones routinely flying over our homes and private yards, and the uncertainty surrounding onboard cameras and data collection. EXHIBIT A 2 • Property values: The potential impact of frequent drone activity on the desirability and resale value of homes in Marshfield and surrounding neighborhoods. • Wildlife and the environment: The potential disturbance to birds and other wildlife that are part of the natural environment we came here to enjoy. We are especially concerned that residents may be asked to accept these changes without a clear understanding of exactly where drones will fly, how frequently they will operate, and what the cumulative impact will be on our neighborhoods. Before considering approval, we believe the city should require Amazon to provide detailed flight maps, projected flight frequencies, operating hours, independently verified noise studies, and meaningful assessments of residential and environmental impacts. These findings should be made available to the public with adequate time for review and comment. We respectfully urge the Planning Commission to deny the proposed land-use and development approvals. At the very least, we ask that the Commission postpone any decision until these important questions have been fully and independently addressed. We did not move to this beautiful area expecting the skies above our residential communities to become commercial delivery corridors. We believe homeowners deserve a meaningful voice in decisions that could permanently change the character of the neighborhoods in which we have chosen to live. Please include our letter in the official public record and share it with all Planning Commission members before a decision is made. Thank you for your consideration and for your service to our community. Sincerely, Henry & Colleen Brink Marshfield by Beazer Homes Longs, South Carolina 11 For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future. 12 Then you will call on me and come and pray to me, and I will listen to you. 13 You will seek me and find me when you seek me with all your heart. Jeremiah 29:11-13 All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Dan Kline Sent: Friday, October 9, 2026 7:48 AM To: Pritchard Suzanne; Wood, Jim; Caldwell, Ben Subject: Commercial Drone Delivery — Westboroug h, MA Experience and Questions Attachments: Mass_Blue_Skies_Westborough_Community_Information_Guide.pdf Dear Ms. Pritchard, Mr. Wood and Mr. Caldwell, I’m reaching out on behalf of Mass Blue Skies, a community group in Westborough, Massachusetts, where our town is currently working through many of the same questions North Myrtle Beach is facing around commercial drone delivery. I am not writing to advocate for a particular decision in North Myrtle Beach. I simply wanted to offer information from another municipality dealing with this issue in real time. What has become increasingly clear to us is that this is not really about one company. One operator may be first, but once the infrastructure and precedent are established, other companies may follow. That raises broader municipal questions: • What scale of commercial drone activity should a community plan for over one, three and five years? • What flight frequency could surrounding neighborhoods ultimately experience? • Could routes or operating patterns concentrate activity over particular areas? • What noise and cumulative-impact information should communities request? • What local land-use authority remains available even where federal aviation authority governs the aircraft and airspace? • What operating, incident, complaint and flight data should be available to the municipality? • How should future expansion be addressed if initial operations begin at a relatively small scale? We would be glad to share what Westborough has learned so far, including the questions our boards, residents, state legislators and outside experts are examining. As an FYI, I attached the one-page community information guide we just created for Westborough residents. It lays out the different meetings ahead, what is being decided at each one, and why each matters. It is one example of the materials we are using to help residents understand the process, and we would be happy to share other materials if useful. Our background is at MassBlueSkies.org. If it would be useful, I’d be happy to connect virtually or by phone. Best regards, Dan Kline On behalf of Mass Blue Skies 2 508-934-6354 MassBlueSkies.org | #MassBlueSkies All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. MASS BLUE SKIES WESTBOROUGH COMMUNITY UPDATE What is being decided, why it matters, and when residents can speak up. There is not one single drone decision. Different Town meetings are deciding different parts of the proposal. The key is knowing what each meeting is about and why your voice matters. 1. What does "accessory use" mean? The question is whether drone delivery is just an extra part of the business already allowed at 64 Otis Street, or whether it is a new use that needs more Town approval. WHY IT MATTERS That answer can change which Town boards review the project, what approvals are needed, and how much public review happens before operations begin. 2. What is Article 8? Article 8 is the proposed Town Meeting article about commercial drone operations in Westborough. Residents will vote on whether to put local rules in place. WHY IT MATTERS Article 8 is separate from the zoning appeal. Article 8 is about new Town rules. The zoning appeal is about how the proposed drone use fits the rules already in place. Five dates to know THU OCT 8 7:00-8:30 PM Warrant Information Session WHAT HAPPENS: Article 8 and other warrant articles were explained; residents could ask questions. WHY IT MATTERS: Background for the October 19 vote. TUE OCT 13 6:00 PM Select Board Meeting WHAT HAPPENS: Memorial Hall, Town Hall, 34 West Main Street. WHY IT MATTERS: Residents can follow Town business and review the posted agenda. MON OCT 19 7:00 PM Special Town Meeting WHAT HAPPENS: Westborough High School. Westborough voters vote on Article 8. WHY IT MATTERS: Residents directly decide on the proposed local drone rules. MON NOV 2 Zoning Board of Appeals WHAT HAPPENS: The Board is expected to hear the zoning appeal on classification. WHY IT MATTERS: The accessory-use question may affect required local approvals. TUE NOV 10 Planning Board Continuation WHAT HAPPENS: Continued review of the proposed site plan at 64 Otis Street. WHY IT MATTERS: Residents can follow what site approvals may be required next. You do not need to be a zoning expert. Show up. Ask questions. Understand what is being decided. Vote when you can. MassBlueSkies.org | #MassBlueSkies Community-led. Evidence-based. Focused on meaningful public input. 1 Pritchard Suzanne From: Fabbri Ryan L Sent: Monday, October 12, 2026 10:14 AM To: Pritchard Suzanne Subject: FW: Procedure Suzanne, Trey forwarded me this email and asked if we could respond to his questions. I’d appreciate it someone would respond directly to Mr. Quinn’s email and cc Trey on the response. Thanks, Ryan Fabbri City Manager City of North Myrtle Beach Phone: 843-280-5597 Mobile: 843-231-0039 1018 2nd Avenue South, North Myrtle Beach SC 29582 Web: www.nmb.us Email: rlfabbri@nmb.us From: Ray T. Skidmore <rtskidmore@nmb.us> Date: Sunday, October 11, 2026 at 1:27 PM To: Fabbri Ryan L <rlfabbri@nmb.us> Subject: Fw: Procedure Could you send this to whoever you think could help me ensure these questions for Roger? Thanks Trey Get Outlook for iOS From: Trey skidmore <treyskidmore@yahoo.com> Sent: Sunday, October 11, 2026 1:26 PM To: Ray T. Skidmore <rtskidmore@nmb.us> Subject: Fw: Procedure 2 Sent from Yahoo Mail for iPhone Begin forwarded message: On Sunday, October 11, 2026, 11:13 AM, ROGER QUINN JR > wrote: Questions About the Amazon Amendment A few questions should be answered before the proposed Amazon drone facility amendment is approved. Who provided the information being relied upon? Much of the information I have seen so far appears to have been provided by Amazon or its representatives. To the best of my knowledge, the Planning Commission has not conducted an independent technical study of the proposal. There is also an important procedural question. Under the North Myrtle Beach zoning ordinance, an amendment classified as minor may be decided by the Planning Commission without approval by City Council. A major amendment requires further consideration by City Council. The initial classification is made by the city’s zoning administrator. But classification as “minor” should not end the inquiry. The Planning Commission still has the responsibility to consider whether the proposed change meets the requirements for approval. That leads to three reasonable questions: 1. Why was the Amazon proposal classified as a minor amendment? 2. What independent research or reports have city departments provided to the Planning Commission? 3. Does the Commission have enough independent information to make an informed decision? Earlier this year, another proposed PDD amendment was processed as a major amendment and went before City Council. That does not prove the Amazon proposal should also be considered major, but it demonstrates why the distinction matters. 3 These questions do not assume that Amazon’s proposal is unsafe or that it should be rejected. They ask whether the city has independently examined a new type of operation before granting final approval. This is a layman’s reading of the city’s procedures and ordinance. I am not an attorney and offer no legal opinion. Reviewed and edited with ChatGPT and Microsoft Word. Roger T. Quinn, Jr. email provider.This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: ROGER QUINN JR Sent: Monday, October 12, 2026 4:02 PM To: Pritchard Suzanne Subject: Re: Procedure Dear Ms. Pritchard, Thank you for your thoughtful and detailed response. I appreciate the time you took to clarify the City’s review process and the responsibilities of the Planning Commission. My articles were written with one central question in mind: Can North Myrtle Beach properly evaluate a proposed drone distribution facility by examining primarily its physical site modifications, without sufficiently considering how the proposed use may affect surrounding properties and the broader community? I recognize the distinction between the City’s land-use authority and the FAA’s responsibility for flight operations. My interest remains in ensuring that the broader community implications receive appropriate consideration within the City’s review process. Thank you again for your professionalism, your willingness to address my questions, and for including them in the Commission’s record. Sincerely, Roger Quinn Roger T. Quinn, Jr. email provider.This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. On Oct 12, 2026, at 2:20 PM, Pritchard Suzanne <lspritchard@nmb.us> wrote: Hi Mr. Quinn, 1 Pritchard Suzanne From: T G Sent: Monday, October 12, 2026 10:16 AM To: Pritchard Suzanne Cc: Wood, Jim Subject: Amazon Drone Proposal – Correspondence for Planning Commission Hi Suzanne, Thank you again for your assistance and responsiveness regarding Amazon's proposed drone delivery facility. As discussed, I'm forwarding my comments for consideration at the October 20 Planning Commission meeting. Because my letter raises several specific questions and includes links to supporting information, I would greatly appreciate it if you could forward the complete correspondence directly to each Planning Commissioner so they have an opportunity to review it individually before the meeting. Would you mind confirming that each commissioner will receive a copy? Thank you again for your help! Tristin To: North Myrtle Beach Planning Commission Re: Amazon Drone Delivery Proposal – Request to Postpone October 20 Approval Dear Planning Commission Members, I am a resident of Members Club Village in Grande Dunes, Myrtle Beach, approximately 1.5 miles south of Amazon's proposed drone facility at 8651 Water Tower Road. While I am not opposed to drone delivery in principle, I am concerned that North Myrtle Beach may approve a project with significant consequences for neighboring communities without meaningful input from many of those most affected, including Myrtle Beach, Horry County, Atlantic Beach, Briarcliffe Acres, Grand Strand Medical Center, nearby golf courses and residential neighborhoods. I respectfully ask the Commission to consider the following before making a decision: 1. Flight Corridors, Noise, and Residential Impacts Amazon's map identifies substantial no-fly areas around Grand Strand Airport and the wildlife preserve, potentially funneling southbound drone traffic over Members Club Village, Golf Village, North Village, 2 and surrounding neighborhoods. Amazon proposes operating seven days a week, sunrise to sunset, yet has not provided projected flight paths or neighborhood-level flight frequencies for the full 7.5-mile service area. A September 2026 Nebraska news report documented three Amazon drones flying overhead during a 15-minute interview and approximately 50 arrivals and departures during one hour. Nebraska news video: https://www.3newsnow.com/papillion-lavista-ralston-bellevue/i-can-hear-them-all-day-amazon-prime- air-drones-draw-noise-complaints-from-sarpy-county-residents Many residents specifically chose this area for its beautiful weather, outdoor lifestyle, and quiet neighborhoods, often paying a premium for homes away from airport flight paths. They now face the possibility of frequent commercial drone traffic over their pools, patios, and backyards. If wildlife warrants protection from drone disturbance, shouldn't homeowners deserve equally serious consideration? The Commission should establish why the preserve is excluded and require meaningful noise and flight-frequency projections for affected neighborhoods. 2. Grand Strand Medical Center Helicopter Operations Grand Strand Medical Center, a Level I Adult Trauma Center in Myrtle Beach, operates an emergency helicopter landing facility approximately 1.5 miles from my neighborhood. Amazon's map appears to identify no-fly areas around two other area hospitals with helipads (Mcleod Seacoast Hospital and Mcleod Health Carolina Forest ER), but not Grand Strand Medical Center. Why the difference? Has Amazon coordinated with the hospital, helicopter operators, and FAA regarding emergency flights that may approach from different directions? 3. Why Is This a "MINOR" PDD Amendment? Although the launch pads themselves may be small, their impact could extend miles beyond the property. Delivery trucks travel on established public roads. These drones would fly directly over private backyards, pools, and patios, effectively creating commercial aerial delivery corridors where none previously existed. Why is this classified as a "MINOR" rather than a "MAJOR" amendment when the original PDD did not contemplate such operations or their off-site impacts? 4. Local Government Responsibility The FAA regulates aviation safety, but local governments retain responsibility for land-use and zoning decisions. The FAA states: "The FAA does not select the locations for commercial drone operators to conduct operations. The operators select the locations." 3 Its guidance also addresses local zoning requirements and noise-sensitive residential areas. FAA guidance: https://www.faa.gov/uas/advanced_operations/package_delivery_drone North Myrtle Beach's approval could affect thousands of residents outside its jurisdiction. Although Horry County Airports participated in the October 7 workshop, other affected municipalities, institutions, businesses, and neighborhoods deserve a meaningful opportunity to participate before approval. 5. Privacy and Recording Amazon's drones use cameras for navigation and obstacle avoidance. According to information presented, recordings are overwritten during the next flight unless retained for an investigation. This raises important questions: Are residents' private outdoor activities continuously recorded during overflights? How long can footage remain stored if a drone is not flown again for an extended period? Who can access recordings retained for investigations? Residents who are not receiving drone deliveries should not have their outdoor activities potentially recorded simply because their homes lie beneath a commercial flight corridor. 6. Future Expansion Amazon currently proposes deliveries to qualifying single-family homes, subject to package-size, weight, and landing-area restrictions. Are these enforceable conditions of approval, or could Amazon later expand delivery eligibility, operating hours, package capacities, range or flight volume without further local review? 7. Community Engagement Amazon has indicated that it will hold a community engagement meeting this fall, yet the Commission may vote on October 20, before that meeting occurs. Residents and neighboring jurisdictions should have the opportunity to review actual flight corridors, projected traffic, noise, and privacy impacts, and receive substantive answers before approval. Request to Postpone Approval I respectfully request that the Commission postpone its decision until Amazon provides complete flight- path, frequency, noise, and privacy information; the hospital helicopter concerns are addressed; the "MINOR" versus "MAJOR" classification is explained; and affected municipalities, institutions, golf courses, and residents have been meaningfully consulted. Closing Just because something can be done does not mean it should be done. The Commission's responsibility is not simply to determine whether this project can be approved, but whether it should be approved after fully considering its consequences. 4 Technological progress should not come at the expense of public safety, privacy, or the quality of life of residents, particularly those outside North Myrtle Beach who have no direct representation in this decision. Thank you for your consideration. Tristin Goode All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Sent: Tuesday, October 13, 2026 1:27 PM To: Pritchard Suzanne; Thomas, Hank Subject: Amazon Drone Matter Dear Members of North Myrtle Beach Planning Commission My wife and I are full-time residents of Barefoot Resort and Golf. We have been extremely happy and satisfied living here in North Myrtle Beach but are exceedingly concerned with the potential of Amazon initiating drone service here in North Myrtle Beach. Living in the Barefoot community, we would be at an eminent risk for continuous flyovers of drones bringing with them constant noise and invasive privacy issues. We are genuinely concerned that our way of life here will be negatively affected with this effect being something that will not be escapable. If this variance is permitted, our property values will drop and our peaceful lifestyle will be irreparably affected forever. We do not rent our property but many properties in our community are regularly rented especially in the summer months and I can assure you that our community will become a pariah to renters once they realize the non-stop drone invasion would be a daily occurrence. Once Pandora’s box is opened, it can never be closed. We have become knowledgeable of other communities that have unfortunately been victimized by this drone process which has made us exceedingly anxious about this threat being allowed in our community. As our Planning Commission representatives, we are imploring you to NOT ALLOW Amazon’s request for drone coverage to move forward. If your homes were within the flight path of these invasive machines, we would hope that your opinion would be in alignment with ours. Please vote against allowing this process to continue as this would be disastrous to our homes, surrounding communities and way of life. We trust that this information will be forwarded to the members of the Planning Commission. Thank you for your consideration in this matter. Jeffrey and Holly Ravel All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Galbreath Allison K Sent: Tuesday, October 13, 2026 2:02 PM To: Baldwin, James; Bubba C. Collins; Coyne, Jon; Hank Thomas; McCumbee Jeri L; Wober Melissa H; Ray T. Skidmore; Callie Jean Wise; Ed Horton; Ed Prince; Harry Oehler; Joe Gosiewski; Silvio Cutuli; Ty Bellamy Cc: Fabbri Ryan L; Greenwood Tara J; Wood, Jim; Pritchard Suzanne; Westmoreland Angela C Subject: FW: Amazon drone thoughts Attachments: Amazon drones.docx Good afternoon, Mr. Freire called this afternoon and asked that I send his email with attached letter to you for your consideration. Have a great rest of your day! Allison Galbreath Assistant to the City Manager/City Clerk 843.280.5604 akgalbreath@nmb.us From: John Barb Freire Sent: Tuesday, October 13, 2026 1:00 PM To: Galbreath Allison K <akgalbreath@nmb.us> Subject: Amazon drone thoughts Dear Ms. Galbreath, Thank you for helping us disseminate this letter regarding the Amazon proposal to the Planning Commission, City Counsel and the Mayor's office. I am not that great at using electronic mailings (nor at typing) so any help is appreciated. We had previously forwarded a form letter that we received about the subject but decided to get better informed so we attended the Planning workshop. The letter is a direct response to what we heard then and learned since. Thanks again, John Freire All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. On 10/7/26 I and my wife attended a Planning Commission Workshop regarding a “Minor Planned Development District Amendment Z-26-22, involving a planned drone facility at the Amazon fulfillment site. Here are our thoughts about what we learned at this work shop. While the word “minor” is within the title of the proposal, if it is approved the potential impacts on North Myrtle Beach can be “MAJOR”. Not only will the quality of life in NMB be threatened but also our property value, while the city of North Myrtle Beach will be forfeiting even more of it’s autonomy to Amazon and the FAA. Once the amendment is approved it will be an easy glide path for Amazon to get approval from the FAA to commence drone deliveries. Then Amazon will be able to modify it’s plans and need only the approval of the FAA to implement them. The city of NMB will have no say in the matter. Amazon will be able to increase the number of flights beyond the 1000 flights per day in their current plan. NMB will have no options to stop it. The FAA will rule. (As a side note no one from the FAA was present at this workshop to answer any questions.) Amazon could petition the FAA to alter or add flight paths. NMB will have no options to stop it. If Amazon develops a bigger drone with larger loads capacities the FAA simply has to give a green light and it’s a done deal, no matter the impacts of that decision. NMB will have no options to stop it. If the decibel level of the drones go from their estimated 42 dB at a height of 100 feet to 52dB, 62dB or higher, only the FAA will have the authority to do something about it. NMB will have no options to do anything about it. Flying hours will be determined between Amazon and the FAA. NMB will have no say in it. Amazon will control the skies above us and in large part our quality of life and the value of our homes and property. It seems that the only way to protect our skies and our quality of life is for the Planning Commission to deny this application. Certainly Amazon with their billions of dollars and army of lawyers will take the city to court. Powerful entities and the people behind them don’t like being told no. They will counter that they want to be part of the community, take the communities concerns into account, respond to customers demands that they introduce and expand this new service because “everyone wants it and loves it”, that they would take responsibility for any tragedy that might happen due to this new service “just like we do if a driver knocks over a mail box” according to the Amazon spokesperson who was on-line. To me personally, that rang very hollow. Equating replacing a knocked over mailbox due to a driver backing into it, to the damage that might be caused by an 83 pound object falling out of the sky from a height of up to 400 ft. does not equate. The probability of this type of event happening, slim, but not zero. At least the Amazon spokesperson was very up front. He acknowledged that if this is passed the only major obstacle left will be FAA approval. Seeing the rapid expansion of drone delivery services across the country, it is doubtful that that would be much of an obstacle for Amazon and their cadre of lawyers and government lobbyists. I believe that Amazon will use the approval of this “minor amendment” to show how enthusiastic NMB is about letting them establish a drone delivery system here in NMB. Once the FAA rubber stamps the plans, it’s game over for NMB quality of life and autonomy. Just ask the residents of Richardson, College Park, Garland and Plano Texas that are regretting the decision to allow for Prime Air delivery in their area. They are forming organized groups to try to fight Amazon regarding the drone system that is disrupting their lives. While the Amazon rep was candid about the FAA approval, he wasn’t so much so about the North Haven, Connecticut plan. I recently moved from Connecticut to NMB and informed myself about the situation there before I relocated. The gentleman was asked about the “withdrawal” of an application for drone delivery application in North Haven. He insisted th at no such “withdraw” has been submitted. While that is technically true, a “hold” has been put on the application so that the applicable boards can study the request more in depth including the experiences of location such as Richardson, Texas and others. To me, the gentleman seemed put off by the question and defensive about it. As might be expected Amazon accentuates and exaggerates the potentially positive aspects of their proposal while down playing the negative and potentially 1 Pritchard Suzanne From: Galbreath Allison K Sent: Friday, October 16, 2026 2:06 PM To: Fabbri Ryan L; Greenwood Tara J; Wood, Jim; Pritchard Suzanne; Callie Jean Wise; Ed Horton; Ed Prince; Harry Oehler; Joe Gosiewski; Silvio Cutuli; Ty Bellamy Cc: Westmoreland Angela C; Noury, Chris Subject: FW: Amazon Prime Air Drone Facility - Water Tower Road Attachments: Amazon Prime Air drone Facility -signed.pdf Please see email below and attached information from Grand Dunes, Waccamaw Management for the Planning Commission’s consideration at the October 20, 2026, meeting. Thank you, Allison Galbreath Assistant to the City Manager/City Clerk 843.280.5604 akgalbreath@nmb.us From: Joshua Julian Sent: Friday, October 16, 2026 1:59 PM To: Galbreath Allison K <akgalbreath@nmb.us>; Baldwin, James <jobaldwin@nmb.us>; Bubba C. Collins <bccollins@nmb.us>; Coyne, Jon <jfcoyne@nmb.us>; McCumbee Jeri L <jlmccumbee@nmb.us>; Ray T. Skidmore <rtskidmore@nmb.us>; Thomas, Hank <hathomas@nmb.us>; Wober Melissa H <mhwober@nmb.us>; Fox Simons <fsimons@cityofmyrtlebeach.com>; dearcitycouncil@cityofmyrtlebeach.com Subject: Amazon Prime Air Drone Facility - Water Tower Road Good afternoon, Please find attached the formal correspondence from the Grande Dunes Master Association regarding the proposed Amazon Prime Air Drone Delivery Facility at 8651 Water Tower Road and PDD Amendment Z-26-22. We respectfully request that the attached correspondence be reviewed and included as part of the official record for the October 20, 2026 Planning Commission proceedings. Thank you for your attention and consideration. 2 If I have provided you with 5 star customer service, please leave us a 5 star Google review HERE! Joshua Julian | Vice President of Operations All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Baldwin, James Sent: Saturday, October 17, 2026 7:39 AM To: Pritchard Suzanne Subject: Fwd: 'I can hear them all day': Amazon Prime Air drones draw noise complaints from Sarpy County residents J. 0. Baldwin 111 City of N.M.B. P.O. Box 190 North Myrtle Beach S.C. 29597 Office 843-272-5853 Cell 843-458-0931 Sent From my iPhone Begin forwarded message: From: Dana Brown Date: October 16, 2026 at 9:38:46 PM EDT To: "Baldwin, James" <jobaldwin@nmb.us>, "Thomas, Hank" <hathomas@nmb.us>, "Coyne, Jon" <jfcoyne@nmb.us>, Wober Melissa H <mhwober@nmb.us>, "Bubba C. Collins" <bccollins@nmb.us>, McCumbee Jeri L <jlmccumbee@nmb.us>, "Ray T. Skidmore" <rtskidmore@nmb.us> Subject: 'I can hear them all day': Amazon Prime Air drones draw noise complaints from Sarpy County residents Please watch this very short video clip. Because the public is blocked from contacting our Planning Commissioners directly, please share with them before they vote on Tues. To contact the Planning Commission, why are we all forced through a single control point? It is listed on City website as we must only phone one particular staff member. Why is the Commission so out of reach, and what is this staff member responsible for relaying to them? Thank you Dana Brown Grande Dunes North https://www.yahoo.com/news/videos/hear-them-day-amazon-prime-124832117.html 2 All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: MM Sent: Monday, October 19, 2026 10:40 AM To: Pritchard Suzanne Subject: Fwd: Urgent Safety Concerns Regarding Amazon Drone Proposal Mrs.Pritchard, I was informed to forward you my email, which I had originally sent to my representative (Jeri McCumbee) regarding the request for Amazon to add drone delivery services on Water Tower Road. Please feel free to reach out to me if you have any questions. Thank you, Michael Maxwell ---------- Forwarded message --------- From: MM < Date: Mon, Oct 19, 2026 at 10:33 Subject: Re: Urgent Safety Concerns Regarding Amazon Drone Proposal To: McCumbee Jeri L <jlmccumbee @nmb.us> Thank you for your service and your quick response. Have a great day. On Mon, Oct 19, 2026 at 08:58 McCumbee Jeri L <jlmccumbee@nmb.us> wrote: Thank you Mr Maxwell. I too share your concerns. Unfortunately this is not before City Council to vote on. I encourage you to forward this email to Mrs.Pritchard to share with the planning and zoning commission. lspritchard@nmb.us This may help them in their questions and decisions. I appreciate you reaching out and if this issues comes before me, I will absolutely ask these questions. Jeri McCumbee Sent from my iPhone On Oct 18, 2026, at 6:20 PM, MM < wrote: Mayor Baldwin and Councilwoman McCumbee, I am writing ahead of Tuesday’s vote regarding Amazon’s proposal to operate commercial delivery drones in North Myrtle Beach. I recognize that there are many factors for the Council to consider, but I strongly believe there are significant questions regarding public safety and emergency response that should be fully addressed before a decision is made. Like many residents, I share concerns about the broader impact this program could have on our community, including noise pollution, potential effects on property values, and the unknown impact on local wildlife and migratory birds. With projections of potentially 2 1,000 deliveries per day, the cumulative effect of large commercial drones operating over our neighborhoods deserves careful consideration. However, my greatest concern is public safety. I am a retired Police Captain from the Bridgewater Township Police Department in New Jersey. Throughout my law enforcement career, I saw firsthand the importance of allowing police, fire, EMS, and other emergency personnel to respond quickly and adapt to circumstances that are often unpredictable and rapidly evolving. Emergency response does not always happen according to a predetermined plan, and unnecessary complications can have very real consequences. The proposed Amazon launch facility is in close proximity to Highway 31, Highway 22, and Highway 17, major corridors where serious accidents and other emergencies can and do occur. If a medical helicopter is called to respond to a serious accident, it may need to approach and land based on the location and circumstances of that emergency, not according to a routine or predictable flight path. The same concern applies to aerial firefighting operations. As we saw with the fires in our area last year, aircraft may be called into service with little notice and must go wherever conditions require them to go. Before approving routine commercial drone traffic in this area, I believe the Council should have clear answers to some very important questions: How are Amazon’s drones immediately cleared from the airspace when a medical helicopter, firefighting aircraft, law enforcement aircraft, or other emergency aviation resource is dispatched? Who has authority to ground or redirect those drones, and how quickly can that happen? How are emergency pilots and first responders made aware of active drone operations? If drones are already in flight when an emergency occurs, where do they go? Do they immediately return to the launch facility, divert to predetermined locations, or potentially land elsewhere in the community? Most importantly, has this emergency response protocol been reviewed and approved by Federal, State, County and local fire, EMS, law enforcement, emergency management, and other agencies whose personnel will ultimately have to operate around this technology? First responders already make split-second decisions in circumstances where minutes, and sometimes seconds, matter. They should not have to delay a response or add another potential hazard to their calculations because commercial drones are delivering groceries or other household goods. 3 I am not opposed to new technology or progress. But innovation should not move faster than the safeguards necessary to protect the public. Once a program of this scale becomes operational, addressing unforeseen consequences becomes far more difficult than identifying and resolving them beforehand. For that reason, I respectfully ask that the Council not approve this proposal until these emergency-response and public-safety questions have been thoroughly examined, answered publicly, and coordinated with the agencies responsible for protecting our residents and visitors. North Myrtle Beach is not simply a market for a new delivery service. It is our home, and it is a destination entrusted with the safety of millions of visitors. A decision with the potential to change our airspace, our neighborhoods, and the way emergency responders operate deserves more than assurances that problems can be addressed later. Thank you for your service to our community and for taking the time to consider these concerns before Tuesday’s vote. I sincerely hope Council will require the necessary answers before making a decision that could have lasting consequences for North Myrtle Beach. Respectfully, Michael Maxwell Retired Captain Bridgewater Township Police Department New Jersey North Myrtle Beach Resident All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Elizabeth Snow Sent: Monday, October 19, 2026 1:02 PM To: Pritchard Suzanne Subject: Formal Letter of Opposition - Amazon launchpad Attachments: NMB Amazon Drone Opposition Letter.pdf Please see the attached letter of opposition for the Planning Commissioners. Thank you, Elizabeth Snow All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. October 19, 2026 To: The Town of North Myrtle Beach Planning Commission Attn: Chairman Silvio Cutuli and Commission Members Location: City Hall, 1018 Second Avenue South, North Myrtle Beach, SC 29582 Regarding: Formal opposition letter to the Minor Site Plan Amendment for the Commercial Drone Launchpad (Water Tower Road Warehouse Site) From: Bobby & Elizabeth Snow Dear Chairman Cutuli and Mem bers of the Planning Commission, We are writing as property owners in the Grande Dunes - North Village community to state our formal opposition to the proposed minor site plan amendment allowing a 16,000-square-foot commercial drone launch facility off Water Tower Road. As the Planning Commission evaluates this request, we urge you to look beyond the FAA’s airspace clearance and focus on the ground-level zoning, environmental, and residential impacts that fall squarely under the Town's jurisdiction. We ask you to vote "NO" on this amendment based on the following critical factors: 1. Direct Infringement on Gated Privacy, Security, and Property Values We purchased our home in Grande Dunes - North Village specifically for its privacy, safety, and security. As a gated community, our neighborhood was intentionally designed to limit unauthorized access, vehicular traffic, and commercial intrusion. Permitting Amazon to route commercial drone flight paths over our strictly private properties completely subverts the core purpose of a gated development. These drones carry advanced camera arrays and sensors; flying them directly over our private backyards, patios, and pools constitutes a severe breach of personal privacy that we, as taxpayers, purposefully invested to avoid. Additionally, we paid a premium market price for a gated, amenity-rich community in which to enjoy the beautiful outdoors and mild year round weather. A commercial drone flight path overhead will undeniably damage our neighborhood’s desirability and lead to a significant decrease in property values as well as for all other neighborhoods in the direct path of 1000 flights per day. 2. Disruption of the Local Sanctuary for Wildlife Our community is defined by its pristine coastal environment. We enjoy an abundance of local birds and butterflies—delicate ecosystems that will be severely threatened by a projected fleet operating up to 1,000 flights per day. The high-pitched, persistent acoustic signature of drone propellers is a documented stressor to avian populations. We are deeply concerned that this constant, low-altitude industrial noise will drive these species away, causing permanent ecological displacement and stripping our neighborhood of the natural environment we cherish. 3. Destruction of Peace and the Residential Buffer Grande Dunes - North Village serves as a vital sanctuary away from the intense hustle, traffic, and noise of the Grand Strand’s tourist districts. Introducing a heavy commercial flight corridor directly through our neighborhood erodes the quiet enjoyment of our homes. The Planning Commission’s fundamental duty is to protect residential zoning from industrial nuisances. Allowing continuous drone traffic from sunrise to sunset effectively transforms a peaceful residential buffer into a commercial logistics highway. 4. Premature Approval in the Absence of a Regulatory Framework As the Commission has previously noted, North Myrtle Beach does not currently possess a comprehensive local ordinance or regulatory framework to manage, limit, or enforce restrictions on commercial drone hubs. Approving a massive, permanent 16,000-square-foot infrastructure amendment before the town has established municipal guidelines regarding local noise thresholds, land-use boundaries, or commercial density creates a highly dangerous legal precedent. Doing so will legally obligate the town to approve future launchpads for Walmart, FedEx, and UPS, permanently altering the character of North Myrtle Beach. 5. Safety I am concerned with how drones will affect the safety of our citizens and the response times of emergency vehicles. Will drones impact emergency landings of helicopters for fire and health? This is especially troubling considering the history of wildfires as well as 31, 22, and 17 being hazards roads to travel. Emergency response needs full, unobstructed access in life-threatening situations. They do not need to be waiting on a drone to land or re-route. The FAA may regulate the sky, but the Town of North Myrtle Beach controls the ground. You have the full authority to deny the zoning infrastructure required to make this deployment possible. We respectfully urge the Commission to protect its residents safety and quality of life and to preserve our local environment by voting **NO** on the Water Tower Road launchpad amendment on October 20th. Sincerely, Bobby & Elizabeth Snow 1 Pritchard Suzanne From: Dara Baltuskonis Sent: Tuesday, October 20, 2026 11:33 AM To: Pritchard Suzanne Cc: Baldwin, James; Bubba C. Collins; McCumbee Jeri L; Coyne, Jon; Hank Thomas; Wober Melissa H; Ray T. Skidmore; Fabbri Ryan L Subject: Request for Denial of Z-26-22 Proposed Amazon Prime Air Drone Launch Facility — 8651 Water Tower Road, North Myrtle Beach Members of the Planning Commission, I respectfully urge the Commission to deny this application as submitted. The issue before you is not whether Amazon should be permitted to develop drone delivery technology. It is whether this particular operation is an appropriate land use at this location and whether it can legitimately be approved as a minor amendment to the Parkway Group Planned Development District. I believe this application raises fundamental questions about land-use compatibility, the classification of the proposed facility, the adequacy of the information provided, and the long-term consequences of the City's decision. These questions deserve more than a determination that the facility fits within an existing paved area. 1. This is more than a minor change in land use The proposed facility would occupy approximately 13,627 square feet of existing paved area and include drone launch and landing pads, diversion areas, turn stations, storage containers, and related equipment intended to support recurring commercial drone operations. Although the physical construction may be limited, the operational change is substantial. The Commission must look beyond the physical footprint and consider the activity the property is being approved to accommodate. Land use is about how a property operates, not just what is built on it. An existing warehouse or distribution property does not automatically authorize every new form of commercial transportation or delivery operation. The fact that drone delivery supports package distribution does not, by itself, establish that a dedicated drone launch facility qualifies as an accessory use under the City's zoning ordinance. Before granting approval, the Commission should require a clear demonstration that the proposed operation meets the City's definition of an accessory use and satisfies the applicable criteria for a minor amendment. If that demonstration has not been made, the application should not be approved under that classification. 2. Does this facility function as an aviation operation rather than an accessory use? The applicant may characterize the drone launch facility as an accessory use because it supports package delivery. However, the Commission should look beyond that label and examine the actual function of the proposed operation. 2 Dedicated launch and landing pads, diversion areas, turn stations, and associated equipment raise a legitimate question about whether this is merely incidental to warehouse activity or a distinct aviation-related use. The fact that an operation supports a warehouse does not automatically make it an accessory use under the City's zoning ordinance. I am not suggesting that this facility is legally classified as a conventional airport. Rather, I am asking the Commission to determine whether an operation designed to facilitate recurring aircraft takeoffs, landings, and commercial delivery flights meets the City's definition and criteria for an accessory use. If the facility functions as a dedicated aviation operation, the Commission should carefully consider whether approving it as a minor accessory-use amendment is appropriate. The applicant should demonstrate how the proposal satisfies the applicable ordinance provisions, and the Commission should explain the basis for its determination. The City should not allow the label of accessory use to substitute for a meaningful evaluation of the proposed activity and its land-use implications. 3. The applicant's absence raises serious concerns about the adequacy of the review I find it extremely concerning that no representative for the applicant was present at today's workshop to participate in the discussion, answer the Commission's questions, or provide clarification regarding the proposed facility. Given the significance of this proposed land-use change, the applicant's participation was particularly important. Questions remain about the facility's classification, operating procedures, noise, flight paths, roadway safety, and compatibility with surrounding properties. These are not minor technical details; they are central to determining whether the proposed use is appropriate for this location. The Commission and the public deserve clear answers before a decision is made on a proposal of this nature. The applicant should be prepared to explain the intended operation, address legitimate concerns, and demonstrate compliance with the City's applicable requirements. I recognize that an applicant's absence, by itself, does not establish grounds for denial. However, the absence of a representative reinforces the need to withhold approval until the Commission has sufficient information to make a well-supported decision. The City should not be expected to fill gaps in the applicant's presentation or assume that unresolved concerns will be addressed after approval. 4. Compatibility with surrounding land uses must be demonstrated The proposed site must be evaluated in the context of nearby homes, Highway 31, Water Tower Road, and other surrounding properties. The fact that the launch area is separated from residences does not, by itself, establish compatibility. The Commission should consider expected flight frequency, operating hours, projected noise, flight paths, and potential impacts on nearby residents and motorists. The applicant should provide sufficient information for the City to evaluate these effects before approving the site. The Commission should also identify the specific Comprehensive Plan policies and future land-use objectives that support this operation. An industrial or distribution designation should not automatically be interpreted to permit every activity associated with logistics without considering its actual characteristics and impacts. 3 5. The City should not defer its land-use decision to the FAA The FAA regulates aviation safety and access to airspace, while the City determines whether a proposed use is appropriate under its local zoning and development requirements. These are separate decisions. Even if Amazon receives the necessary FAA authorizations, that does not automatically establish that this particular site is compatible with surrounding land uses or that the application qualifies as a minor amendment. The City should determine what lawful conditions or protections it can establish through its own approval process before the facility is built. Residents should not have to wait until operations begin to discover the practical effects of a use that may be difficult to relocate later. The Commission should resolve the land-use questions within its authority before the facility is approved, rather than assume that federal approval will settle them later. 6. Highway safety and operational impacts require further review Given the site's proximity to Highway 31 and Water Tower Road, the Commission should request information about proposed flight paths, whether drones will cross or operate over these roads, and what procedures will apply in the event of an emergency, equipment failure, or diverted landing. I am not claiming that an accident will occur. I am asking that the applicant demonstrate that the proposed operation has been appropriately evaluated and that the Commission has sufficient information to make an informed land-use decision. The same applies to noise. The City should request projected noise levels at nearby residences, expected daily flight volumes, and proposed operating hours, including early mornings and evenings. The absence of adequate information should not be interpreted as evidence that these impacts will be insignificant. 7. The Commission should consider the precedent this decision establishes Approving this facility as a minor accessory use could influence how similar requests are handled at other warehouse and distribution properties throughout the City. If a dedicated commercial drone launch operation is classified as a minor accessory use because it supports package delivery, what limits would apply to similar requests in the future? Would other facilities be able to introduce recurring aircraft operations without the level of review ordinarily associated with a distinct or materially different use? These questions deserve a consistent, ordinance-based answer. The Commission should not establish a broad interpretation of accessory use without carefully considering its implications for future development, surrounding property owners, and the integrity of the City's planned development process. 8. The appropriate decision is denial as submitted 4 The Commission's responsibility is to determine whether the application satisfies the governing zoning requirements, not simply whether the proposed technology is commercially viable or whether the site can accommodate the equipment. If the applicant has not demonstrated that the facility qualifies as an accessory use, that the minor-amendment process is appropriate, and that the proposal satisfies the applicable land-use standards, the Commission should decline approval. I respectfully request that the Commission: 1. 2. 3. Deny 4. Z-26-22 as submitted 5. if the application does not establish compliance with the applicable zoning and amendment criteria. 6. 7. 8. 9. Decline 10. to treat the proposed drone facility as a minor accessory-use amendment without a clear, ordinance- based justification. 11. 12. 13. 14. Require 15. the applicant to pursue the appropriate amendment process if the proposed use warrants more extensive review. 16. 17. 18. 19. Require 20. sufficient site-specific information to evaluate land-use compatibility and potential impacts on surrounding properties before any future approval. 21. 22. 23. 24. State 25. clearly on the record the findings supporting its decision under the applicable ordinance provisions. 26. This is not a request to reject innovation or prevent Amazon from pursuing its business. It is a request to ensure that commercial innovation does not bypass the City's established land-use review process. Closing statement Members of the Commission, a decision to deny this application as submitted would not amount to a rejection of drone delivery technology. It would recognize that a proposed use must meet the City's standards before it is approved, regardless of the size or influence of the company proposing it. 5 The question is whether a dedicated drone launch facility, with recurring aircraft operations and potential effects beyond the property boundaries, has been adequately justified as an appropriate use of this site and as a minor amendment to the existing planned development. The applicant's absence from today's workshop, combined with the outstanding questions about land-use classification and operational impacts, reinforces why the Commission should not move forward without a sufficient factual basis for approval. I respectfully ask you to deny this application as submitted rather than approve a new operational use first and leave the community to address its consequences afterward. Finally, I would like to sincerely thank the members of the Planning Commission for your dedication and the considerable time and attention you have devoted to reviewing this matter. I also extend my appreciation to the Planning and Development Department for its due diligence, research, and efforts in evaluating this application. I recognize the complexity of these decisions and appreciate your responsibility to balance development interests with the long-term needs of our community. Thank you for your service, your thoughtful consideration, and your commitment to making informed decisions in the best interest of North Myrtle Beach and its residents. Thank you for your time and consideration. Dara Baltuskonis All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Paul Capps Sent: Monday, October 19, 2026 9:22 PM To: Baldwin, James; Pritchard Suzanne; Galbreath Allison K; Caldwell, Ben; Frazier Gregory T; Westmoreland Angela C Subject: Opposition to Amazon Drone Launch Pad Attachments: DroneLaunchPadOpposition.pdf TO: North Myrtle Beach Town Government FROM: Paul and Teresa Capps RE: Opposition to the Amazon Drone Launch Pad off Watertower Road We would like to express our opposition to the proposed Amazon Drone Launch Pad proposed off Watertower Road. This is very near our home and we are deeply concerned. We live in the North Village community at We are very concerned about the noise, quality of life, the safety and the many potential unintended consequences. There are bald eagles here in the trees as well. Thank you very much. Paul and Teresa Capps All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the 2 individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Shannon Basquill Sent: Wednesday, October 14, 2026 11:20 AM To: Planning Subject: Apposing Amazon Drones Why Amazon Drones Should Not Be Allowed in Our Area The introduction of Amazon delivery drones in our community raises serious concerns about privacy, saf ety, noise pollution, and quality of life. Although drone deliveries may offer convenience, that convenienc e should not come at the expense of residents' peace of mind and the character of our neighborhood. 1. Privacy concerns Residents should not have to worry about drones flying over their homes, yards, and outdoor living space s. Even when drones are used for deliveries, people may have concerns about onboard cameras, data co llection, and how information is handled. Our community deserves clear privacy protections before thes e services are introduced. 2. Safety risks Drones operating over residential neighborhoods raise questions about what happens if a drone malfunc tions, loses power, or falls from the sky. There should be clear safety standards, reliable oversight, and a ccountability before residents are expected to accept these risks. 3. Noise pollution People should be able to enjoy their homes, gardens, and outdoor spaces without the repeated buzzing o f delivery drones. Noise could be especially disruptive in quiet residential neighborhoods, where resident s value peace and quiet. 4. Effects on the community Our neighborhood is more than a delivery zone. Residents should have a say in how the airspace above t heir homes is used. Drone delivery programs should not be introduced without meaningful public input a nd a transparent explanation of their potential effects. 5. Impact on wildlife and the coastal environment North Myrtle Beach is a coastal community where protecting wildlife and the natural environment matter s. Before drone deliveries begin, the city should require a clear assessment of potential impacts on birds, other wildlife, and sensitive coastal habitats. Residents deserve evidence that these impacts have been properly considered. 6. The benefits may not justify the disruption 2 Amazon offers faster delivery, but residents who do not use the service could still experience the noise a nd increased air traffic. A company's desire to make deliveries more quickly should not automatically out weigh the interests of the people who live nearby. These concerns are especially relevant to North Myrtle Beach, where Amazon has proposed a drone laun ch facility at its existing distribution center on Water Tower Road. The city has documented community q uestions about noise, privacy, and safety. All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Sheila Blazer Sent: Friday, October 9, 2026 5:04 PM To: Planning Subject: Amazon drones I'm sending this email to express my opposition to any amendment to/additional ordinance or other governing regulation that would permit the use of Amazon drones in North Myrtle Beach. Sheila Blazer All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Laura Sent: Saturday, October 10, 2026 9:37 PM To: Planning Subject: Amazon Drones Please vote against allowing drone deliveries. We have enough noise here already. I also think it might lead to bigger drones and packages in the future. A real slippery slope scenario. Thanks for your time. All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Charlene Scarpati Sent: Sunday, October 18, 2026 1:27 PM To: Planning; Ispritchard@nmb.us Subject: Formal Opposition to Amazon Prime Air Drone Facility Dear Members of the North Myrtle Beach Planning Commission: I am writing to express my strong opposition to Amazon’s proposed Prime Air drone delivery facility at 8651 Water Tower Road. My husband and I own a home at , which we purchased to enjoy our retirement in a peaceful, safe, and beautiful community. We made a significant financial investment in our future with the expectation of enjoying the tranquility and quality of life this area offers. The prospect of up to 1,000 drone flights per day, seven days a week, is deeply concerning. Such an operation could significantly alter the character of our residential neighborhoods and negatively impact the quality of life of surrounding homeowners. My primary concerns include: • Noise and quality of life: Frequent drone activity could disrupt the peaceful enjoyment of our homes and outdoor spaces. • Property values: Homeowners should not be expected to bear the risk of diminished property values for Amazon’s commercial benefit. • Safety and privacy: Repeated drone flights near residential properties raise legitimate safety and privacy concerns. • Environmental impact: Frequent flights could negatively affect local wildlife and the natural coastal environment. • Transparency and expansion: Residents deserve clear information regarding flight paths, operating frequency, and safeguards against future expansion. As homeowners, we pay property taxes, maintain our property, and contribute to the community. We should not be expected to accept a significant change to our residential environment primarily for the benefit of a large corporation. Amazon’s commercial interests should not take precedence over the safety, property rights, and quality of life of North Myrtle Beach residents. I respectfully urge the Planning Commission to vote NO on this proposal and prioritize protecting our neighborhoods, property values, and the peaceful coastal environment that makes this community so desirable. 2 Thank you for your consideration. I respectfully request that this letter be shared with all commissioners and included in the public record. Sincerely, Joseph and Charlene Scarpati Sent from my iPhone All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Shannon Basquill Sent: Wednesday, October 14, 2026 11:20 AM To: Planning Subject: Apposing Amazon Drones Why Amazon Drones Should Not Be Allowed in Our Area The introduction of Amazon delivery drones in our community raises serious concerns about privacy, saf ety, noise pollution, and quality of life. Although drone deliveries may offer convenience, that convenienc e should not come at the expense of residents' peace of mind and the character of our neighborhood. 1. Privacy concerns Residents should not have to worry about drones flying over their homes, yards, and outdoor living space s. Even when drones are used for deliveries, people may have concerns about onboard cameras, data co llection, and how information is handled. Our community deserves clear privacy protections before thes e services are introduced. 2. Safety risks Drones operating over residential neighborhoods raise questions about what happens if a drone malfunc tions, loses power, or falls from the sky. There should be clear safety standards, reliable oversight, and a ccountability before residents are expected to accept these risks. 3. Noise pollution People should be able to enjoy their homes, gardens, and outdoor spaces without the repeated buzzing o f delivery drones. Noise could be especially disruptive in quiet residential neighborhoods, where resident s value peace and quiet. 4. Effects on the community Our neighborhood is more than a delivery zone. Residents should have a say in how the airspace above t heir homes is used. Drone delivery programs should not be introduced without meaningful public input a nd a transparent explanation of their potential effects. 5. Impact on wildlife and the coastal environment North Myrtle Beach is a coastal community where protecting wildlife and the natural environment matter s. Before drone deliveries begin, the city should require a clear assessment of potential impacts on birds, other wildlife, and sensitive coastal habitats. Residents deserve evidence that these impacts have been properly considered. 6. The benefits may not justify the disruption 2 Amazon offers faster delivery, but residents who do not use the service could still experience the noise a nd increased air traffic. A company's desire to make deliveries more quickly should not automatically out weigh the interests of the people who live nearby. These concerns are especially relevant to North Myrtle Beach, where Amazon has proposed a drone laun ch facility at its existing distribution center on Water Tower Road. The city has documented community q uestions about noise, privacy, and safety. All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Sheila Blazer Sent: Friday, October 9, 2026 5:04 PM To: Planning Subject: Amazon drones I'm sending this email to express my opposition to any amendment to/additional ordinance or other governing regulation that would permit the use of Amazon drones in North Myrtle Beach. Sheila Blazer 618 Bay St. NMB, SC 29582 All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Laura Sent: Saturday, October 10, 2026 9:37 PM To: Planning Subject: Amazon Drones Please vote against allowing drone deliveries. We have enough noise here already. I also think it might lead to bigger drones and packages in the future. A real slippery slope scenario. Thanks for your time. All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. 1 Pritchard Suzanne From: Charlene Scarpati < Sent: Sunday, October 18, 2026 1:27 PM To: Planning; Ispritchard@nmb.us Subject: Formal Opposition to Amazon Prime Air Drone Facility Dear Members of the North Myrtle Beach Planning Commission: I am writing to express my strong opposition to Amazon’s proposed Prime Air drone delivery facility at 8651 Water Tower Road. My husband and I own a home at , which we purchased to enjoy our retirement in a peaceful, safe, and beautiful community. We made a significant financial investment in our future with the expectation of enjoying the tranquility and quality of life this area offers. The prospect of up to 1,000 drone flights per day, seven days a week, is deeply concerning. Such an operation could significantly alter the character of our residential neighborhoods and negatively impact the quality of life of surrounding homeowners. My primary concerns include: • Noise and quality of life: Frequent drone activity could disrupt the peaceful enjoyment of our homes and outdoor spaces. • Property values: Homeowners should not be expected to bear the risk of diminished property values for Amazon’s commercial benefit. • Safety and privacy: Repeated drone flights near residential properties raise legitimate safety and privacy concerns. • Environmental impact: Frequent flights could negatively affect local wildlife and the natural coastal environment. • Transparency and expansion: Residents deserve clear information regarding flight paths, operating frequency, and safeguards against future expansion. As homeowners, we pay property taxes, maintain our property, and contribute to the community. We should not be expected to accept a significant change to our residential environment primarily for the benefit of a large corporation. Amazon’s commercial interests should not take precedence over the safety, property rights, and quality of life of North Myrtle Beach residents. I respectfully urge the Planning Commission to vote NO on this proposal and prioritize protecting our neighborhoods, property values, and the peaceful coastal environment that makes this community so desirable. 2 Thank you for your consideration. I respectfully request that this letter be shared with all commissioners and included in the public record. Sincerely, Joseph and Charlene Scarpati Sent from my iPhone All e-mail correspondence to and from this address may be subject to public disclosure under the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or entity to which it is addressed and may contain information that is proprietary, privileged, confidential or otherwise legally exempt from disclosure. . PETrflON REGARDING PROPOSED AMAZON PRIME AIR DRONE OPERATIONS ON WATER TOWER ROAD To the City of North Myrtle Beach Planning Commission, City Council, and Other Appropriate Officials: We, the undersigned residents, homeowners, and property owners of Grande Dunes North Village and surrounding communities, strongly oppose the proposed Amazon Prime Air drone delivery facility on Water Tower Road and respectfully request that the City reject this proposal. This is not simply a request to place another commercial business in an existing commercial area. Approval would introduce a new form of repetitive commercial aircraft activity immediately adjacent to established residential communities and could fundamentally change the environment surrounding our homes. Residents purchased, built, and invested in their homes with the reasonable expectation that nearby commercial development would not result in repeated aircraft operations over and around residential neighborhoods. OUR CONCERNS 1. Repetitive noise and disruption The issue is not merely how loud a single drone may be during one brief demonstration. The relevant question is the cumulative impact of repeated departures, arrivals, and flights throughout each operating day, which Amazon has stated would be up to 1,000 per day. Residents deserve to know what it will actually sound like in our yards, porches, walking paths, pools, parks, and other outdoor spaces when a commercial drone operation is functioning at scale. 2. Proximity to homes A commercial drone launch facility capable of generating repeated daily aircraft movements should not be placed so close to established residential communities without compelling evidence that it will not adversely affect the people already living there. The burden should not fall on residents to prove after the facility begins operating that the location was inappropriate. 3. Unknown residential flight paths Before this project proceeds, residents should know exactly where drones are expected to fly, at what altitudes, how frequently they may pass individual neighborhoods, and whether departure and return corridors will concentrate flights over particular communities. Approval should not come first and answers about flight patterns later. Stating these decisions are made by the FAA is insufficient. 4. Safety These are autonomous aircraft operating above a populated community. Residents deserve clear information regarding equipment failures, loss of communication or navigation, emergency landings, severe weather, collision avoidance, and procedures for incidents involving homes, vehicles, pedestrians, pets, roads, and community facilities. The possible consequences of introducing repeated aircraft operations over populated areas warrant careful scrutiny. 5. Privacy Residents deserve complete disclosure regarding the cameras, sensors, navigation equipment, and other technology carried by these aircraft, including what information is collected while drones travel over or near private property, whether images or other information are retained, and who may have access to that information. \7) � � 1 � � \\ >-- 0. ;::::, r-- � <: -0 :0 z -l m 0 z )> 3:m C/) c5 z � C :0 m )> 0 0 :x, m en en 0 ("),, IJ> m 3: (") � � 0 m z ::0 -o m :,:, -l 00 -0 0 0 ci.i (/) )> )> -0 r- "'C1 ::0 0 <m Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-19 2498 Water Tower Rd - Ann\Z-26-19 SR.docx Page 1 of 4 5A. ANNEXATION & ZONING DESIGNATION Z-26-19: City staff received a petition to annex ±2.00 acres on Water Tower Road identified by PIN 348-02-04-0002. The lots are currently unincorporated and zoned Commercial Forest Agriculture (CFA) by Horry County. The petition also reflects the requested City of North Myrt le Beach zoning district of Highway Commercial (HC) and will be heard concurrently. Background On May 20, 2025, the Planning Commission recommended approval of annexation with Limited Industrial (LI) zoning. The applicant subsequen tly withdrew that petition following City Council’s recommendation to request Highway Commercial (HC) zoning. City Council denied the subsequent annexation and HC zoning petition on October 6, 2025. The current application was received on July 23, 2026. The twelve-month anniversary of City Council’s October 6, 2025 denial has now passed, and the request is scheduled for Planning Commission consideration on November 10, 2026. Existing Conditions and Surrounding Land Uses: The subject property area is contiguous to the corporate boundary of the City of North Myrtle Beach and is zoned CFA under Horry County jurisdiction. Located on Water Tower Road, the parcel is fully developed for commercial use and improved with a modern commercial structure, featuring paved access, utilities, and site enhancements suitable for retail or service-based operations. Surrounding parcels within City li mits are zoned LI and Mid-Rise Multifamily Residential (R-2A); surrounding county parcels are zoned CFA. The Water Tower Road area has experienced su bstantial changes in its development pattern, including an increasing concentration of commerc ial and trade-oriented businesses. Access to Highways 31 and 22 makes the area attractive to businesses that depend on convenient transportation connections. The subject propert y is already commercially developed and forms part of this evolving business corridor, which al so includes nearby residential development. A sketch of surrounding land uses is attached as Exhibit B and illustrates the subject site and nearby development pattern, including adjacent residential uses highlighted in orange. Proposed HC Zoning District Single- Family Dwelling Multifamily Dwellings Hotels, Motels, Resort Accommodations All Other Uses3 Minimum Site Area (SF) N A 15,000 15,000 10,000 Minimum Lot Area per Dwelling Unit 10,000 1,350 NA NA Minimum Lot Width N A 100 fee t 100 fee t N A Minimum Yards: Front 25 fee t 20 fee t 20 fee t 20 fee t Side 10 fee t5 1 1 82 Rear 20 fee t 20 fee t 20 fee t 20 fee t Maximum Impervious Surface Ratio 60% 80% 80% 90% Common Open Space 20% 20% N A Maximum Height of Structures 35 feet 50 feet 70 feet 50 feet 4 Maximum Height of Signs N/ A 10 fee t 40 fee t 40 fee t Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-19 2498 Water Tower Rd - Ann\Z-26-19 SR.docx Page 2 of 4 Notes: 1 Ten (10) feet for the first thirty-five (35) feet plus one (1) foot for each one and one-half (1½) feet over thirty-five (35) feet; for each building in excess of eighty (80) feet in width, one (1) additional foot on each side shall be required for each seven (7) feet in building width over eighty (80) feet. For the purpose of calculating side setbacks and/or building separations, the height of the roof section (if not devoted to living or storage space) shall not be considered in determining the height of the structures. 2 On buildings two hundred (200) feet in width or less, an eight-foot setback shall be required, except that commercial condominium projects shall be allowed to share interior property lines; for buildings greater than two hundred (200) feet in width, the following setbacks shall be required on the end units; further provided that such projects (buildings) shall not exceed six hundred (600) feet in width. Width of Project Side Yard Required (2 Sides) To 200 feet 8 fee t 201—400 feet 16 fee t 401—600 feet 30 fee t 3 "Big box" retail shall provide the following: All lighting systems installed within the parking area shall use a ninety- degree (or less) cutoff luminaire angled away from non-commercial properties with a maximum height of thirty (30) feet measured from the base of the pole when installed. All lamp posts shall be contained within a landscape island. Reference article VII, general supplemental, developments of regional significance, for guidelines and standards affecting gross retail square footage of seventy-five thousand (75,000) square feet or greater. 4 With approval of the North Myrtle Beach Board of Zoning Appeals as a special exception, amusement rides in amusement parks can extend up to seventy (70) feet in height. 5 A five-foot side yard setback shall be required for substandard lots of record. Departmental Review Planning, Zoning, Public Works, and the Fire Marshal reviewed the annexation and rezoning and have no issues or outstanding comments to be addressed. Applicable Standards S.C. Code §§ 5-3-150(3) and 5-3-305 govern annexation of contiguous property by petition signed by all owners. Section 23-115 of the City of No rth Myrtle Beach Zoning Ordinance requires Planning Commission review and a zoning re commendation before City Council acts on annexation and zoning. Under § 23-4(3), the Commission must report its findings and recommendation, considering the request’s relationship to the Comprehensive Pl an; whether it violates or supports the Plan; appropriateness of permitted uses; adequacy of schools, roads, and other public services and the consequences of the change; and consistency with water and sewer plans. Section 23-4(4) allows favorable action to implement the Plan, correct an original mistake or manifest error, recognize substantial change or changing local conditions, or recognize changes in technology, lifestyle, or business practices. Section 23-4(5) requires a public hearing, newspaper notice at least fifteen days beforehand, and property posting. The Plan’s annexation policies also inform review. City Council makes the final annexation and zoning decision. Proposed Findings of Fact 1. Annexation Petition and Contiguity. The Planning Commission finds the petition has been submitted under the 100 percent owner-petition method and that the record demonstrates that the property is contiguous to the City within the meaning of § 5-3- 305. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-19 2498 Water Tower Rd - Ann\Z-26-19 SR.docx Page 3 of 4 2. Annexation Considerations. The Planning Commission finds that the Comprehensive Plan identifies land around the interchange of Highways 22 and 31 as an area with potential for annexation. Annexation of this developed parcel would extend City land-use jurisdiction to property adjoining the existing municipal boundary along Water Tower Road and allow the City to guide its future use and development as part of the surrounding growth area. These circumstances support annexation independently of the requested zoning designation. 3. Relationship to the Comprehensive Plan. The Planning Commission finds that the Future Land Use Map designates the subject property as Residential Suburban. This classification is intended primarily to provide and protect low-density, single-family residential areas and accommodate the infill and expansion of existing neighborhoods. The property’s existing commercial development and the changing commercial character of the Water Tower Road area differ from that residential development pattern. 4. Whether the Request Violates or Supports the Comprehensive Plan. The Planning Commission finds that annexation supports the Comprehensive Plan’s identification of the Highways 22 and 31 area as a potential annexation area. The requested HC zoning is inconsistent with the mapped Residential Suburban classification. However, the area’s increasing commercial and trade-oriented development supports consideration of HC zoning based on changed local conditions rather than implementation of that residential classification. 5. Appropriateness of the Proposed Zoning. The Planning Commission finds that HC zoning is appropriate for the subject property in light of its existing commercial development, the increasing concentration of commercial and trade-oriented businesses along Water Tower Road, and access to Highways 31 and 2 2. The surrounding area includes a mix of commercial and residential uses, as shown on Exhibit B. These circumstances are consistent with the HC District’s purpose of accommodating a range of commercial uses at accessible locations. Nearby residential development remains a compatibility consideration, and future uses and development would remain subject to applicable zoning and site-development requirements. 6. Public Facilities and Services. The Planning Commission finds that the property is already commercially developed and has access to an existing roadway. Planning, Zoning, Public Works, and the Fire Marshal reviewed the request and identified no outstanding comments precluding annexation and HC zoning. Continued commercial use is not anticipated to generate additional public-school demand. Future changes in use or redevelopment may alter service demands and would require review under applicable development requirements. 7. Water and Sewer Service. The Planning Commission finds that public water and sewer is available through Grand Strand Water and Sewer. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-19 2498 Water Tower Rd - Ann\Z-26-19 SR.docx Page 4 of 4 8. Changed Conditions and Basis for Zoning Designation. The Planning Commission finds that the increasing concentration of commercial and trade-oriented businesses along Water Tower Road represents substantial change or changing conditions in the locality. The area’s access to Highways 31 and 22 supports its developing role as a location for businesses dependent on convenient transportation connections. Establishing HC zoning for this commercially developed parcel recognizes those conditions and provides a basis for favorable action under § 23-4(4)(c). Planning Commission Action The Planning Commission shall consider the proposed annexation and requested HC zoning designation, adopt Findings of Fact, and make a recommendation to City Council. City Council retains final authority over annexation and zoning. First and second readings are tentatively scheduled for December 7, 2026 and January 4, 2027. Alternative Motions I move that the Planning Commission adopt the Applicable Standards and Proposed Findings of Fact contained in this report and recommend that City Council approve Annexation and Zoning Designation Z-26-19, including annexation of the subject property and establishment of Highway Commercial (HC) zoning. OR • Recommend approval by adopting modified findings of fact. • Recommend approval by adopting modified findings of fact and additional conditions. • Recommend denial by adopting findings of fact supporting denial. • Postpone the application. FILE NUMBER: Z-26-19 Complete SubmittalDate: July 23, 2026 Notice Published: Planning Commission: November 10, 2026 First Reading: December 7, 2026 Second Reading: January 5, 2027 City of North Myrtle Beach, SC Petition for Annexation &Zoning GENERAL INFORMATION Date of Request: July 23, 2026 Property PIN(S): 34802040002 Property Owner(s): MGMT, LLC Type of Zoning Map Amendment: Petition for Annexationand Zoning Address or Location: 2488 Water Tower Rd., Longs, SC29568 Project Contact: Jeremy Hartlaub Contact Phone Number: Contact the Planning Division for Info Contact Email Address: Contact the Planning Division for Info Current County Zoning: Horry Proposed Zoning: HC Total Area of Property: 2 Acres Approximate Population of Area to be Annexed: 0 RECORDED COVENANT INFORMATION I hereby certify that the tract(s) or parcel(s) of land to which this approval request pertains is not restricted by any recorded covenant that is contrary to,conflicts with,or prohibits the activity for which approval is sought, as provided in South Carolina Code of Laws (§ 6-29-1145). Applicant's E-signature: Jeremy Hartlaub This form complies with a state law that took effect on July 1, 2007 (S.C. Code § 6-29-1145) that requires all planning agencies to inquire in anapplication for a permit if the parcel of land is restricted by a recorded covenant that is contrary to, conflicts with, or prohibits the permitted activity. Ifsuch a covenant exists, the agency shall not issue the permit until written confirmation of its release is received. The release must be through the actionof an appropriate legal authority. 1018 2nd Avenue South · North Myrtle Beach, SC 29582 · Telephone: (843) 280-5566 · Facsimile: (843) 280-5581 10/26/26, 2:38 PM about:blank about:blank 1/1 Staff Report to Planning Commission – Tuesday, November 10, 2026 5B. REVISED REZONING REQUEST Z-26-14: The Planning & Development Department is reviewing a revised request to rezone four parcels located on Creek Front Road containing ±0.96 acres, PINs 351-16-02-0025, 351-16-02-0026, 351-16-02-0030, and 351-16-02-0032, from Highway Commercial (HC) to Medium Density Residential (R-2). The original request included six parcels. PINs 351-16-02-0029 and 351-16-02-0031 have been re moved from the request. No change to the existing HC zoning of those two parcels is proposed. Background: The Planning Commission previously recommended a pproval of a request to rezone six parcels on Creek Front Road from Highway Commercial (HC) to Medium Density Residential (R-2). Following that recommendation, two property owners withdrew their properties from the request. The revised request returns to the Planning Commission for review and recommendation on the four remaining parcels, totaling ±0.96 acres. The two withdrawn parcels would retain HC zoning. Exhibit A shows the revised rezoning area. Existing Conditions and Surrounding Land Uses: Located on Creek Front Road, the subject parcel s are developed with single-family detached dwellings. Surrounding parcels are zoned R-2, HC, and Conservation Preservation (CP). The subject parcels themselves have historically been developed residentially. Today, development away from the Sea Mountain Highway frontage, including properties along the marsh, is predominantly residential, while commercial development in the immediate area is concentrated along Sea Mountain Highway. Comparison of Existing and Proposed Zoning: The purpose of the HC district is to provide comme rcial opportunities to the traveling public, and areas in the community where large-scale commercial projects may take place with minimal impact on contiguous residential development. This district is designed to support local as well as regional shopping centers, and business c omplexes. As such, this district will accommodate a wide range of business and commercial uses, clustered where feasi ble for "cumulative attraction" and located for optimum accessibility. The purpose of the R-2 district is to provide for limited alternatives to single- family housing, smaller lot development and corresp ondingly higher densities, but not permit the crowding of development on individual lots or parcels. Permitted uses within HC districts include th e following: Personal service establishments; convenience, primary and secondary retail establishments; general business services; funeral homes and accessory crematoriums; professi onal offices; commercial recrea tion establishments; churches, places of worship, and religious institutions including accredited educ ational facilities when accessory thereto; motels, hotels , lodges, and inns; hospitals, clinics, nursing and convalescent homes; educational institutions; armories, lodges and civic clubs; commercial and training schools; animal hospitals and veterinary clinics; auto mobile service and repair; public and private transportation service and facili ties; commercial parking lots an d structures; adult entertainment establishments; signs as permitted by Article III; accessory uses incidental to multifamily dwellings, hotels, motels, inns, lodges and resort resident ial; other accessory uses ; cemeteries; and video gaming machines or stations. Permitted uses within the R-2 districts include the following: Zero lot line, single-family detached developments; town house developments; family day care homes; \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\REV Z-26-14 Pointe Marsh Rezoning\Z-26-14 SR.docx Page 1 of 6 Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\REV Z-26-14 Pointe Marsh Rezoning\Z-26-14 SR.docx Page 2 of 6 multiplex (triplex and quadraplex) dwellings, and single-family in common projects. The following tables detail the development standards for both districts: HC District Single- Family Dwelling Multifamily Dwellings Hotels, Motels, Resort Accommodations All Other Uses3 Minimum Site Area (SF) N A 15,000 15,000 10,000 Minimum Lot Area per Dwelling Uni t 10,000 1,350 NA NA Minimum Lot Width N A 100 fee t 100 fee t N A Minimum Yards: Front 25 fee t 20 fee t 20 fee t 20 fee t Side 10 fee t5 1 1 82 Rear 20 fee t 20 fee t 20 fee t 20 fee t Maximum Impervious Surface Ratio 60% 80% 80% 90% Common Open Space 20% 20% N A Maximum Height of Structures 35 feet 50 feet 70 feet 50 feet 4 Maximum Height of Signs N/ A 10 fee t 40 fee t 40 fee t Notes: 1 Ten (10) feet for the first thirty-five (35) feet plus one (1 ) foot for each one and one-half (1½) feet over thirty-five (35) feet; for each building in excess of eighty (80) feet in width, one (1) additional foot on each side shall be required for each seven (7) feet in building width over eigh ty (80) feet. For the purpose of calculating side setbacks and/or building separations, the height of the roof sectio n (if not devoted to living or storage space) shall not be considered in determining the height of the structures. 2 On buildings two hundred (200) feet in width or less, an eight-foot setback shall be required, except that commercial condominium projects shall be allowed to share interior property lines; for buildings greater than two hundred (200) feet in width, the following setbacks shall be required on the end units; further provided that such projects (buildings) shall not exceed six hundred (600) feet in width. Width of Projec t Side Yard Required (2 Sides) To 200 feet 8 fee t 201—400 fee t 16 fee t 401—600 fee t 30 fee t 3 "Big box" retail shall provide the foll owing: All lighting systems installed with in the parking area shall use a ninety- degree (or less) cutoff luminaire angled away from non-commercial properties with a maximum height of thirty (30) feet measured from the base of the pole when installed. All lamp posts shall be contai ned within a landscape island. Reference article VII, general supplemental, developments of regional significance, for guidelines and standards affecting gross retail square foot age of seventy-five thousand (7 5,000) square feet or greater. 4 With approval of the North Myrtle Beach Board of Zoning Appeals as a special exception, amusement rides in amusement parks can extend up to seventy (70) feet in height. 5 A five-foot side yard setbac k shall be required for su bstandard lots of record. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\REV Z-26-14 Pointe Marsh Rezoning\Z-26-14 SR.docx Page 3 of 6 R-2 District Single-family Detached Semi- Detached Dwelling Duplex Townhou se Other Permitted Uses Multiplex Floor Area Ratio 0.5 Minimum Site Area (SF) 5,000 7,000 7,000 16,000 5,000 16,000 Minimum Lot Area per DU 5,000 3,500 3,500 3,000 5,000 2,000 Minimum Lot Width 50 feet 35 feet 55 feet 14 feet6 NA 75 feet Minimu m Yards: Front 25 feet 25 feet 25 feet 25 feet 25 feet 25 feet Side 5 feet 7.5 feet1 7.5 feet 2 20 feet 20 feet Rear 20 feet 20 feet 20 feet 3 25 feet 20 feet Maximum Impervious Surface Ratio 50% 60% 60% 60% 60% 60% Common Open Space N/A N/A N/A 25% N/A 25%5 Maximum Distance Between Principal Building on Site N/A N/A N/A N/A N/A 20 feet Maximum Distance to Single-family Dwelling N/A N/A N/A N/A N/A 75 feet4 (a) Maximum height: Thirty-five (35) feet for residential uses, fifteen (15) feet for accessory uses, and forty-five (45) feet for all other permitted uses. (b) A dwelling unit shall not contain more than five (5) bedrooms or sleeping areas of not more than three hundred (300) square feet each. Notes: 1 A seven-and-one-half-foot setback shall be applied to the ends of the structure and the exterior property line, and zero- foot setback shall be allowed for the interior common property line. 2 Zero (0) feet between units; ten (10) feet between end structures and side property line; no more than six (6) units shall be attached in one (1) building; for pr ojects with multiple townhouse building s on land owned "in common" the site side yard setback shall be twenty (20) feet. 3 Rear yard setback shall be ten (10) feet except where contig uous to the project site property line, then a twenty-foot setback shall be required, and shall remain unoccupied by any accessory building or structure. 4 Measured from the closest exterior wall of a single-family dwelling unit on the adjacent property to the closest exterior wall of the multiplex dwelling. 5 Reference common open space requirements pursuant to section 23-119(4). 6 Minimum lot width and/or unit width. Staff Review: Planning and Development, Planning Division The existing single-family development and the residential character of the area behind the Sea Mountain Highway commercial frontage support consideration of residential zoning. However, the revised request raises concerns regarding the piecemeal application of that zoning. Staff is Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\REV Z-26-14 Pointe Marsh Rezoning\Z-26-14 SR.docx Page 4 of 6 concerned that the reduced request may produce a fragmented zoning pattern rather than a logical adjustment of the residential and commercial district boundaries. Planning and Development, Zoning Division The Zoning Administrator has no issue with the proposed rezoning request. Public Works The City Engineer has no issue with the proposed rezoning request. Access remains subject to City encroachment permit approval. Public Safety The Fire Marshall has no issue with the proposed rezoning request but has requested a fire apparatus turning exhibit and a fire hydrant exhibit. Applicable Standards Pursuant to § 23-4 of the City of North Myrtle Beach Zoning Ordinance authorizes City administration to initiate a zoning-map amendm ent and requires Planning Commission review, findings, and a recommendation to City Council. Under § 23-4(3), the Commission must consider the request’s relationship to the Comprehens ive Plan; whether it violates or supports the Plan; appropriateness of permitted uses; adequacy of sc hools, roads, an d other public services and the consequences of the change; and consistency wi th plans for public water and sanitary sewer. Section 23-4(4) permits favorable action to implement the Comprehensive Plan, correct an original mistake or manifest error, recognize subs tantial change or changi ng local conditions or circumstances, or recognize changes in technology, lifestyle, or business practices. Section 23-4(5) requires a public hearing, newspaper notice at least fifteen da ys beforehand, and conspicuous property posting. City Council retains final zoning authority. Proposed Findings of Fact 1. Procedural compliance. Th e application records newspaper publication and property posting on July 30 for the original August 18 public hearing. The publication date satisfies the minimum fifteen-day notice period under § 23-4 (5) 2. Revised request and existing conditions. The revised request would rezone four parcels totaling ±0.96 acres from Highway Commercial (HC) to Medium Density Residential (R-2). PINs 351-16-02 -0029 and 351-16-02-00 31 have been removed from the original six- parcel request and would retain HC zoning. The subject properties are developed with single-family detach ed dwellings with in an area of HC, R-2, and Conservation Preservation (CP) zoning. 3. Relationship to the Comprehensive Plan. The Future Land Use designation is Mixed-Use, which supports larger-scale mixed-use development at transportation nodes and gateways and walkable areas accommodating residential, employment, and commercial activities. Its Compliance Index recommends HC and Resort Commercial (RC), with Neighborhood Commercial (NC) as an alternative. R-2 is not a recommended district. 4. Whether the Request Violates or Supports the Comp rehensive Plan. The request departs from the Plan’s recommended zoning districts. The established residential character behind Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\REV Z-26-14 Pointe Marsh Rezoning\Z-26-14 SR.docx Page 5 of 6 the Sea Mountain Highway commercial fronta ge supports considerat ion of residential zoning, and the Compliance In dex recognizes that other districts may be appropriate based on property-speci fic circumstances. However, exis ting residential use alone does not establish that the revised four-parcel conf iguration supports the Plan’s direction for the area. 5. Appropriateness of Permitted Uses and Zoning Pattern. Single-family residential use is compatible with the ex isting development patte rn, but R-2 permits additional residential forms and different development standards. Ex hibit A shows that the proposed R-2 area nearest Pointe Marsh La ne would extend the existing re sidential district, while other proposed R-2 areas would be se parated from it by parcels retaining HC zoning. This fragmented pattern raises co ncerns about consistent zoni ng treatment. The existing residential uses suppor t consideration of residential zoni ng but do not, by themselves, explain the selective bounda ries of the revised request. 6. Public Facilities and Services. The original review identifies constrained school capacity and records no rezoning objection from Public Works or the Fire Marshal. Access remains subject to City encroa chment approval, and the Fire Marshal requ ested fire-apparatus turning and hydrant exhibits. The revised re quest concerns four de veloped residential parcels and does not itself cr eate additional lots . However, the absence of a subdivision proposal does not establish th at development potential or service demand would remain unchanged under R-2. 7. Water and Sewer Service. Public water and sanita ry sewer service are av ailable to the subject properties, and the request is co nsistent with existing utility- service plans. The availability of service to the existing dwel lings does not establish capaci ty for every use or density permitted under R-2; any addi tional development would require evalua tion of its utility demands. 8. Policy Basis. The area’s transition toward residential development behind the Sea Mountain Highway commercial frontage pro vides a basis to consider a zoning-map amendment under § 23-4(4)(c). However, that rationale applies beyond the four selected parcels and does not explain why the excluded resident ial parcels should retain HC zoning. Although changed conditions support co nsideration of resident ial zoning in this area, they do not adeq uately justify the boundaries of the revised request. The Planning Commission finds that the proposed four-pa rcel configuration do es not provide an appropriate adjustment of the residential and commerc ial district boundaries. Planning Commission Action: The Planning Commission shall consider the propos ed rezoning request, adopt Findings of Fact, and make a recommendation to City Council. City Council retains final authority over the rezoning request. First and second readings are tentativel y scheduled for December 7, 2026, and January 4, 2027. Alternative Motions I move that the Planning Commission adopt the Applicable Standards and Findings of Fact contained in this report and recommend that City Council deny Rezoning Request Z-26-25 Highway Commercial (HC) to Medium Density Residential (R-2), because the revised Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\REV Z-26-14 Pointe Marsh Rezoning\Z-26-14 SR.docx Page 6 of 6 configuration would create a fragmented zoning pattern and the record does not establish a sufficient planning basis for the proposed district boundaries. OR • Recommend approval by adopting modified Findings of Fact. • Recommend approval with additional recommendations by adopting modified Findings of Fact. • Recommend denial by adopting Findings of Fact supporting denial. • Postpone the application to a date certain. Rezoning Finance Account Code:   3.51 FEE PAID:  $500 on July 13, 2026 FILE NUMBER:  Z-26-14 Complete Submittal Date:  July 13, 2026 Notice Published:  July 30, 2026 Property Posted:   Planning Commission:  August 18, 2026 First Reading:  September 21, 2026 Second Reading:  October 5, 2026 City of North Myrtle Beach, SC Application for Rezoning  GENERAL INFORMATION  Date of Request: July 6, 2026  Property PIN(S): 35116020025, 35116020026, 35116020029,35116020030, 35116020031, 35116020032  Property Owner(s): Simon Ransom, Simon Ransom, Monty & Melody Teaque, Chris Manning Builders, Jeff Pitges, Donald j. Wirth  Type of Zoning Map Amendment: Rezoning (not to PDD)  Address or Location: 6 different addresses (624,700,706,708,710,712) on Creek Front Rd   Project Contact: David O'Connell    Contact Phone Number: Contact the Planning Division for Info  Contact Email Address: Contact the Planning Division for Info  Current Zoning: HC  Proposed Zoning: R-2  Total Area of Property: 1.395 Acres  Currently Located in City: Yes RECORDED COVENANT INFORMATION    I hereby certify that the tract(s) or parcel(s) of land to which this approval request pertains is not restricted by any recorded covenant that is contrary to, conflicts with, or prohibits the activity for which approval is sought, as provided in South Carolina Code of Laws (§ 6-29-1145).   Applicant's E-signature: David O'Connell This form complies with a state law that took effect on July 1, 2007 (S.C. Code § 6-29-1145) that requires all planning agencies to inquire in an application for a permit if the parcel of land is restricted by a recorded covenant that is contrary to, conflicts with, or prohibits the permitted activity. If such a covenant exists, the agency shall not issue the permit until written confirmation of its release is received. The release must be through the action of an appropriate legal authority.  1018 2nd Avenue South  ·  North Myrtle Beach, SC 29582  ·  Telephone: (843) 280-5566  ·  Facsimile: (843) 280-5581 Staff Report to Planning Commission – Tuesday, November 10, 2026 5C. MINOR PLANNED DEVELOPMENT DISTRICT AMENDMENT Z-26-13: City staff received an application for a minor amendment to the Robbers Roost Planned Development District (PDD) to extend an existing privacy fence around the neighborhood amenity area and adjacent park. History On October 17, 2017, the Planning Commission approved Minor Planned Development District Amendment MNPDD-17-11 to replace the previously approved passive recreation area with a neighborhood amenity center consisting of a pool, pool house, splash pad, mail kiosk, parking area, and associated improvements. As part of that appro val, a six-foot solid priva cy fence was installed along portions of the amenity area adjacent to Robber's Roost Villa s to provide screening between the parking area and pool facilities while preserving views of the pond from neighboring properties where practical. The current application proposes ex tending the existing privacy fence around the remainder of the amenity area. The Commission postponed the request on July 21, August 18, and September 22, 2026, because access to drainage facilities serving the adjacent Robbers Roost Villas remained unresolved. The facilities extend onto the Robbers Roost Single-Family HOA property. City staff facilitated a meeting between the associations on July 30. The Robbers Roost Villas has had an opportunity to pursue an access and maintenance easement but has not established one. The City does not decide the associations’ private rights. Approval would not determine either association’s legal access rights or drainage-maintenance responsibilities. The proposed gate provides a physical access point if entry onto the Single-Family HOA property is separately authorized. Proposed Changes The applicant requests approval of a minor amendment to the Robber's Roost Planned Development District to extend the existing six-foot privacy fence around the perimeter of the neighborhood amenity area. The proposed amendment would complete the enclosure of the amenity area while retaining the existing layout of the pool, mail kiosk, parking area, and other approved site improvements. A gate would be installed to facilitate future access from Robbers Roost Villas to access/maintain their drainage facilities once the easement has been created. A four-inch clearance above grade will also be maintained along the fence to avoid impeding surface drainage. No changes are proposed to the approved lot layout, roadway network, open space configuration, or permitted land uses. The applicant states that the additional fencing is intended to provide increased privacy and security for the neighborhood amenity area. Staff Review Planning & Development, Planning Division The Planning Division has no issue with the proposed amendment. The proposed extension of the existing privacy fence does not alter the approved land uses, residential density, circulation pattern, or overall design of the Planned Development District and is consistent with the character and intent of the previously approved development. Planning & Development, Zoning Division The Zoning Administrator has no issue with the proposed amendment. \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-13 Robbers Roost Fence - Minor\Z-26-13 SR.docx Page 1 of 3 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-13 Robbers Roost Fence - Minor\Z-26-13 SR.docx Page 2 of 3 Staff Report to Planning Commission – Tuesday, November 10, 2026 Public Works The Public Works Department has no issue with the proposed amendment. Public Safety The Fire Marshal has no issue with the proposed amendment. Applicable Standards Pursuant to § 23-4 and § 23-29 of the City of North Myrtle Beach Zoning Ordinance, the Planning Commission shall review proposed amendments to a Planned Development District and evaluate the relationship of the request to the Comprehensive Plan, the appropriateness of the proposed change, the availability of public facilities and services, and consistency with the approved Planned Development District. Minor changes determined by the Zoning Administrator may be approved by the Planning Commission upon findings identical to those required for the original Planned Development District approval. Proposed Findings of Fact 1. Nature and scope. The applicant requests a minor amendment to the Robbers Roost Planned Development District (PDD) to extend an existing six-foot privacy fence around the approved neighborhood amenity and park area. The proposed fence includes a gate and approximately four inches of clearance above grade. It does not change approved uses, residential density, lot layout, circulation, open space, or recreational facilities. The limited change supports review as a minor PDD amendment under § 23-29(7). 2. Comprehensive Plan relationship. The amendment retains the approved residential and recreational uses and does not change the PDD’s development intensity or pattern. Extending the fence around an existing amenity area does not conflict with the Comprehensive Plan. 3. Appropriateness and compatibility. The proposed extension continues the six-foot screening treatment approved along portions of the boundary in 2017. It would allow the Single- Family HOA to enclose and manage its private amenity area while retaining a gate at the shared boundary. These features support compatibility with the approved amenity area and adjoining development. 4. Public facilities and services. The amendment creates no additional demand for public facilities or services and proposes no changes to the existing drainage facilities. The clearance beneath the fence is intended to allow surface drainage, and the gate provides a physical access point if entry onto the Single-Family HOA property is separately authorized. These features address the physical drainage and access concerns raised during the Commission’s prior reviews; they do not establish legal access. 5. Consistency with the approved PDD. The amendment changes the extent of fencing around the approved amenity area while retaining its use, layout, and recreational facilities. The Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-13 Robbers Roost Fence - Minor\Z-26-13 SR.docx Page 3 of 3 fence extension, gate, and ground clearance are consistent with the limited scope of the proposed PDD amendment. 6. Scope of approval. Approval authorizes the fence configuration presented in this application, including the gate and approximately four-inch clearance above grade. It does not create an easement, grant the Villas a right to enter Single-Family HOA property, or determine either association’s drainage maintenance responsibilities. Planning Commission Action The Planning Commission shall consider the proposed minor Planned Development District amendment and may approve, approve with modifications, or disapprove the request. Alternative Motions I move that the Planning Commission adopt the Findings of Fact contained in this report and approve Minor Planned Development District Amendment Z-26-13 as presented. OR • Approve by adopting modified Findings of Fact. • Approve by adopting modified Findings of Fact and additional conditions. • Deny by adopting Findings of Fact supporting denial. • Postpone the application to a date certain. PDD Zoning Finance Account Code:  3.22 FEE PAID:  No Fee FILE NUMBER:  Z-26-13 Complete Submittal Date:  June 25, 2026 City of North Myrtle Beach, SC Application for a Minor Amendment  to a Planned Development District (PDD)  GENERAL INFORMATION  Date of Request: June 25, 2026  Property PIN(S): 35011030003  Property Owner(s): Robbers Roost at North Myrtle Beach POA  Type of Zoning Map Amendment: Minor PDD Amendment  Address or Location: 1302 Jolly Roger    Project Contact: Monica Powell    Contact Phone Number: Contact the Planning Division for Info  Contact Email Address: Contact the Planning Division for Info  PDD Name: Robbers Roost of North Myrtle Beach POA Total Area of Property: 0 Acres  Proposed Amendment: Connect two vinyl fences along the common area behind the pond on Bonnett Drive RECORDED COVENANT INFORMATION    I hereby certify that the tract(s) or parcel(s) of land to which this approval request pertains is not restricted by any recorded covenant that is contrary to, conflicts with, or prohibits the activity for which approval is sought, as provided in South Carolina Code of Laws (§ 6-29-1145).   Applicant's E-signature: Monica Powell This form complies with a state law that took effect on July 1, 2007 (S.C. Code § 6-29-1145) that requires all planning agencies to inquire in an application for a permit if the parcel of land is restricted by a recorded covenant that is contrary to, conflicts with, or prohibits the permitted activity. If such a covenant exists, the agency shall not issue the permit until written confirmation of its release is received. The release must be through the action of an appropriate legal authority.  1018 2nd Avenue South  ·  North Myrtle Beach, SC 29582  ·  Telephone: (843) 280-5566  ·  Facsimile: (843) 280-5581 SIX (6’ ) FOOT SOLID FENCE SCREENING POOL DECK AND OFF-STREET PARKING AREA AT PROPERTY LINE NOTE: UPON PDD AMENDMENT APPROVAL, ALL PDD EXHIBITS TO BE UPDATED SHOWING REVISED SITE LAYOUT. 338' of White Privacy Vinyl Fence, 6' High Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-20 Parkway Group Garage - Major\Z-26-20 SR.docx Page 1 of 4 5D. MAJOR PLANNED DEVELOPMENT DISTRICT AMENDMENT Z-26-20: City staff received an application for a major amendment to the Parkway Group Planned Development District (PDD) to allow a 43-unit garage development for vehicle storage and related clubhouse, car shows, social events, and food trucks. History On October 20, 2026, the Planning Commission voted 6–0 to postpone the amendment to November 10 to allow revisions to the applicat ion. Discussion addressed the elevations and clarification of uses, events, park ing, circulation, emergency acce ss, and signage. The Commission did not adopt the proposed findings or make a recommendation on the merits. The October 28 operating letter and accompanying exhibits provide additional information and a revised road-facing elevation. The revised elevations, operating provisions, and parking a rrangements have been incorporated into the application, and departme ntal review is complete without outstanding comments. Background The McDowell Corporate Center occupies approximately 35.71 acres along Water Tower Road near Highways 22 and 31 within the Parkway Grou p PDD. The 2023 approval, Ordinance 23-38, established a corporate industrial park accommodating commercial, light-industrial, storage, and distribution uses. Its conceptual plan anticipated multiple buildings around an existing pond and wetland areas. The surrounding area is now characterized by industrial and commercial development. The amendment concerns proposed Parcel 2, approximately 3.6 acres. That parcel has not yet received subdivision approval. The proposal replaces the earlier conceptual layout for this area with the garage development; the remaining corporate-center approvals and obligations are not proposed to change. Proposed Development The proposal provides 43 individually owned, climate-controlled garage units in concrete tilt-wall buildings. Units would include overhead doors, re strooms, and mezzanines, with optional interior kitchenettes, bars, lounges, or game areas. An ac companying project narrative states that units are not habitable and overnight accommodations are pro hibited. A clubhouse for automobile-related gatherings, including car shows, music, social events, and food trucks, is also proposed. The updated narrative identifies a private recreati onal facility for owners and guests, with owner access 24 hours a day, seven days a week and personal mechanical workshops among the intended uses. Public attendance at open events would be limited to invi tation or preregistration. Owner gatherings are anticipated approximately mont hly, typically on weekends, with frequency determined by the property owners ’ association. The nonresidential and no-overnight restrictions are included in the PDD amendment and are also proposed for the private covenants. The applicant identifies 74 regular parking stalls and a 95-vehicle event layout, excluding vehicles stored inside garages. The event exhibit identifies food-truck and entertainment-stage locations. Unlike the earlier expectation that events would be self-contained, the updated narrative proposes overflow parking at the adjoining McDowell Corporate Headquarters. It prohibits parking in public Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-20 Parkway Group Garage - Major\Z-26-20 SR.docx Page 2 of 4 rights-of-way and commits to two gated access po ints, emergency gate access, a continuous 24-foot unobstructed aisle, licensed and insured food-truck vendors, and co mpliance with the City’s noise ordinance. The revised rendering replaces the black-and-white checkerboard treatment visible from Water Tower Road with a predominantly black-and-gray façade, horizontal bands, and red accents. No change is proposed to existing Water Tower Road improvements, sidewalks, street trees, wetland buffers, or East Coast Greenway obligations. Applicable Standards Sections 23-4 and 23-29 govern major PDD amendments. The Planning Commission must prepare findings and a recommendation to City Council addressing the relationship to the Comprehensive Plan; whether the request violates or supports the Plan; appropriateness of permitted uses; adequacy of schools, roads, and other public services and the consequences of the change; and consistency with water and sewer plans. Section 23-4(4) permits favorable action to implement the Plan, correct an original mistake or manifest error, recognize substantial change or changing local conditions, or recognize changes in technology, lifestyle, or business practices. Section 23-29 also addresses site design, compatibility, architecture, circulation, infrastructure, open space, and public benefits. Its architectural provi sions call for a pattern bo ok addressing materials and colors and encourage high-quality design ha rmonious with local design traditions. Major changes require amendatory action; the approve d plans and development provisions bind the property. Section 23-4(5) requires a public hearing, newspaper notice at least fifteen days beforehand, and property posting. City Council retains final approval authority. Proposed Findings of Fact 1. Published notice. Notice was published October 1, 2026, for the original October 20, 2026, public hearing, satisfying the minimum fifteen-day publication period in § 23-4(5). The Commission postponed consideration to November 10, 2026, to allow revisions. 2. Comprehensive Plan relationship. The Future Land Use designation is Mixed Use (MU). The Plan describes larger developments at transportation nodes and gateways, with commercial and recreational opportunities and walkable connections among uses. The Compliance Index allows PDD zoning in all classifications. The garage and clubhouse proposal is one component of a larger approved commercial and industrial development. 3. Support for or conflict with the Plan. The proposed vehicle-storage and related recreational uses are compatible with the commercial and recreational aspects of MU and the site’s access to major transportation corridors. The garage project alone does not establish the broader mix of uses or walkable setting envisioned by MU. Compatibility depends in part on coordinated site design, pedestrian connections, and event operations within the larger development. 4. Appropriateness of uses and design. Vehicle storage and related clubhouse activities fit the surrounding industrial and commercial setting. The revised road-facing rendering removes the checkerboard treatment and addresses the architectural concern identified at the October meeting. The operating provisions clarify private use, controlled event attendance, and emergency access. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-20 Parkway Group Garage - Major\Z-26-20 SR.docx Page 3 of 4 The revised elevations, operating provisions, and regular, event, and shared-parking arrangements are incorporated into the application and have completed departmental review without outstanding comments. These revisions support compatibility with the surrounding development. 5. Public facilities and services. Departmental review of the revised proposal is complete without outstanding comments. The submitted layouts provide 74 regular parking stalls and a 95-vehicle event layout, with headquarters overflow parking addressed through the shared parking arrangements. Event operations must maintain the approved parking capacity and emergency access and prohibit parking in public rights-of-way. The nonresidential proposal is not expected to generate residential school enrollment. The completed review supports the finding that public facilities and services exist or can be provided to serve the proposed development. Existing roadway and infrastructure obligations remain applicable. 6. Water and sewer. The schematic utility plan identifies Grand Strand Water and Sewer Authority as the water and sewer provider. No change to utility-service arrangements is proposed. Final connections and capacity remain subject to provider approval and applicable development requirements. 7. Existing PDD and public benefits. The amendment revises the development concept for proposed Parcel 2. Existing obligations for roadway improvements, sidewalks, street trees, wetland protection, and East Coast Greenway easements remain applicable. Any subdivision requires separate approval. 8. Policy basis. The proposal responds to the locality’s continuing development as an industrial and commercial area and provides a specific development plan for a previously conceptual building site. Favorable consideration may be based on recognition of changing local conditions under § 23-4(4)(c). The revised design and operating provisions address the matters that prompted postponement. Planning Commission Action The Planning Commission shall consider the revised amendment, adopt Findings of Fact, and make a recommendation to City Council. City Council retains final authority over the PDD amendment. The Planning Commission may recommend approval, recommend approval with modifications or recommendations, recommend denial, or postpone the request to a date certain. The recommendation will be forwarded to City Council, with first reading tentatively scheduled for December 7, 2026, and second reading tentatively scheduled for January 4, 2027. Alternative Motions I move that the Planning Commission adopt the Fi ndings of Fact contained in this report and recommend approval of Major Planned Development District Amendment Z-26-20 to City Council, applying the standards identified in the report. OR • Recommend approval by adopting modified Findings of Fact. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\Z-26-20 Parkway Group Garage - Major\Z-26-20 SR.docx Page 4 of 4 • Recommend approval with additional recommendations by adopting modified Findings of Fact. • Recommend denial by adopting Findings of Fact supporting denial. • Postpone the application to a date certain. PDD Zoning Finance Account Code:   3.22 FEE PAID:  $500.00 on September 29, 2026 FILE NUMBER:   Z-26-20 Complete Submittal Date:   September 29, 2026 Notice Published:   October 1, 2026 Planning Commission:   October 20, 2026 First Reading:   November 2, 2026 Second Reading:   December 7, 2026 City of North Myrtle Beach, SC Application for a Major Amendment to a Planned Development District (PDD) GENERAL INFORMATION  Date of Request: August 5, 2026  Property PIN(S): 360-00-00-0010  Property Owner(s): MCC Watertower 1 LLC.  Type of Zoning Map Amendment: Major PDD Amendment  Address or Location: 8471 Water Tower Rd Between ABC Supply and McDowell Corporate building   Project Contact: Thomas McDowell    Contact Phone Number: Contact the Planning Division for Info  Contact Email Address: Contact the Planning Division for Info  PDD Name: Parkway Group PUD  Total Area of Property: 3.58 Acres  Proposed Amendment: Updated site plan with the addition of 4 buildings to parcel 2 RECORDED COVENANT INFORMATION    I hereby certify that the tract(s) or parcel(s) of land to which this approval request pertains is not restricted by any recorded covenant that is contrary to, conflicts with,  or prohibits the activity for which approval is sought, as provided in South Carolina Code of Laws (§ 6-29-1145).   Applicant's E-signature: Thomas McDowell This form complies with a state law that took effect on July 1, 2007 (S.C. Code § 6-29-1145) that requires all planning agencies to inquire in an application for a permit if the parcel of land is restricted by a recorded covenant that is contrary to, conflicts with, or prohibits the permitted activity. If such a covenant exists, the agency shall not issue the permit until written confirmation of its release is received. The release must be through the action of an appropriate legal authority.  1018 2nd Avenue South  ·  North Myrtle Beach, SC 29582  ·  Telephone: (843) 280-5566  ·  Facsimile: (843) 280-5581 Today's Date: 08/05/26 CITY OF NORTH MYRTLE BEACH LETTER OF AGENCY Nature of Approval Requested: POD Amendment Property PIN(s): 360 00 00 0010 Property Address/Location: 8471 Water Tower Rd I Revision Date 05.24.19 I,_M_ C_C _W_a_t_e _rt_o_w_ e_ r_1 _L_L_C __ , hereby authorize Thomas E McDow ell to act as my agent for for the purposes of the above referenced approval. Signature Registered Agent of Corporation Title Title Signature Signature Title Title Signature Signature Title Title Please have all property owners sign application; disregard additional spaces if not needed. If additional signature lines are required, please duplicate this sheet and bind all sheets together into one document. 1018 Second Avenue South North Myrtle Beach, SC 29582 Telephone: 843.280.5560 Facsimile: 843.280.5581 Page 1 of 1 To: North Myrtle Beach Planning Commission October 28, 2026 Ref: McDowell Corporate Center PDD Amendment Project: Z-26-20 Auto Club To whom it may concern, This letter is in response to the Notice of Decision/Recommendation dated October 20, 2026 regarding the Major PDD amendment requested by MCC Watertower 1 LLC referencing a 43 unit garage development. The purpose of this letter is to clarify general operations and how the facility will be used. Daily Operations & Access The facility is for the recreational use of the owners and their guests. Owners have access to their garage and site amenities 24 hours per day, 7 days per week. There is no access for the general public as this is a private facility. The grounds will maintain high security with two electronic gated access points; one directly off Water Tower Rd and the second from the McDowell Corporate HQ where owners will be able to turn right or left exiting the facility onto Water Tower Rd. EMS will access the gate via Siren Operated Sensor or RFID tag. The site will maintain proper turning radii and clearance for emergency vehicles. Intended Uses This facility is a place where auto enthusiasts can be amongst other like-minded individuals that share in their love for all things cars. The facilities’ intended uses include vehicle and motorcycle storage, recreation & lounging, social business, utilizing facility and site amenities, personal mechanical workshop, social events, and auto enthusiast gatherings and events. Owners have the option to customize their units with accompaniments like a game room, lounge space, kitchenette, bar or anything that displays their private collections of personal items. The facility is specifically not for residential use. Overnight accommodations are not permitted and will be part of the CCR’s that will require owners signature prior to closing on their unit. General Events As with any social club, we will hold regular events. These will mostly consist of owner/member related events where the garages are open and people can mingle and enjoy each other’s collections. The frequency would likely be once per month and on a weekend, however is a decision that will be made by the POA once established. Music volume will be kept in accordance with North Myrtle Beach noise ordinance Article V Sections 12-70 through 12-78. Any open events where the general public will be permitted entry will be by invitation or preregistration only as to avoid exceeding the maximum capacity of vehicles permitted outside of the garages. Food Trucks Food trucks may be employed at different events throughout the year. Their position will be in a designated area as to not obstruct emergency vehicles. A minimum 24 foot unobstructed isle way will be maintained throughout the facility at all times. All food truck vendors must be properly licensed and insured prior to admittance to this facility. Parking Two different types of parking layouts will be maintained within the facility as shown on exhibits A & B. The standard parking layout consists of 74 parking stalls. This is intended for day-to-day use and is for the owners and their guests. Event parking is a condensed version of standard parking accommodating 95 vehicles within the immediate facility. These vehicle stall counts do not include the owners vehicle(s) which are stored inside the garage. For large events and overflow parking, patrons may use the parking at the adjoining McDowell Corporate HQ. Parking shall not be permitted to encroach on any public right of way. Sincerely, Ed McDowell MERGE X X X XXXXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXX XXX SD SD SD SD SD SD SD SD SD SD SS DATUR WATER TOWER ROAD SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR W DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR XXXXXXX X X X X X X X X X X X XXXXX XX G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR G DATUR SS DATUR SS DATUR W DATUR W DATUR ONLY ONLY ONLY ONLY W DATUR W DATUR W DATURW DATUR SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SAN SAN SAN SAN SAN SAN SD SD SD SD SD W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSD SDSD SD SD SD SD SD SD CONCRETE STEPS W/ RAILINGS COORDINATE WITH RETAINING WALL CONSTRUCTION ASPHALT PAVEMENT (TYP) ASPHALT PAVEMENT (TYP) 62' (TYP) 62' (TYP) CONCRETE CURB (TYP) 6' OMEGA ELITE FENCING (BY OTHERS) DUMPSTER PAD AND FENCE SEE DETAIL A1 / C-502 WATER TOWER ROAD REPLACE 4' WIDE GRAVEL PAVEMENT (TYP) REPLACE 4' WIDE ASPHALT PAVEMENT (TYP) REPLACE 4' WIDE GRAVEL PAVEMENT (TYP) REPLACE 4' WIDE CONCRETE CURB (2) RETAINING WALLS AND CONCRETE SIDEWALK (BY OTHERS) CONCRETE PAVEMENT (SEE NOTE 3) CONCRETE PAVEMENT (TYP) CONCRETE CURB (TYP) REPLACE 4' WIDE CONCRETE CURB R5'R25' R5' R5' 24' 24' 20' R25' 126' 126' 44' 81' 24' R28' 31' 5' 200' 125' 24' R28' 62' (TYP)90' BUILDING FFE 52.0 10' CONCRETE CURB (TYP) 8' CONCRETE CURB (TYP) ASPHALT PAVEMENT (TYP) CONCRETE CURB (TYP) R5' 36' 27' LANDSCAPE PAVERS BY OTHERS (TYP) 36' 194' ASPHALT PAVEMENT (TYP) 18' CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PLAN TO CITY ENGINEER ACCORDING TO SCDOT DETAILS FOR APPROVAL SD FLUSH 18" WIDE CONCRETE APRON W/ 24' OMEGA ELITE SLIDE GATE (BY OTHERS) 42' R35'R35' R55' R55' ADA RAMP AND CROSSWALK STRIPING (TYP) STOP SIGN, STOP BAR AND DOUBLE SOLID YELLOW LINES CONCRETE SIDEWALK (TYP) R25' R25' 10' 19' 9' LANDSCAPE AREAS (BY OTHERS) 10' 58' 24' 9' 19' 117' VAN ACCESSIBLE ADA PARKING, STRIPING, SIGNS AND RAMPS 108' R28' R5' R5' R5' R5' R5' R5' R5' R5' R5' R20' 23' CONCRETE SIDEWALK (TYP) CURB RAMP (TYP) (2) RETAINING WALLS AND CONCRETE SIDEWALK (BY OTHERS) BOLLARDS (TYP) CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PLAN TO CITY ENGINEER ACCORDING TO SCDOT DETAILS FOR APPROVAL TAPER CURBS TO MATCH WALK ELEVATION ADA ACCESSIBLE PARKING, STRIPING, SIGNS AND RAMPS CURB RAMP (TYP) SDSD SD 4' (TYP) LANDSCAPE AREAS (BY OTHERS) LANDSCAPE PAVERS BY OTHERS (TYP) SIGHT TRIANGLES PER CITY OF NORTH MYRTLE BEACH CONCRETE PAD (TYP) 93' TAPER CURB TO FLUSH CONCRETE CURB (TYP) FLUSH 18" WIDE CONCRETE APRON W/ 24' OMEGA ELITE SLIDE GATE (BY OTHERS) SITE PLANA1 SCALE: 1" = 30'-0" GENERAL NOTES 1. SEE C-001 FOR GENERAL NOTES AND LEGEND. 2. 73 PARKING STALLS WITH 3 ADA STALLS. STANDARD PARKING STALLS SHALL BE 9' X 19' SPACES. 3. CONCRETE PAVEMENT APRON / RAMP TO ACCESS THE REAR OVERHEAD DOOR TO EACH BUILDING UNIT (3 TOTAL). 4. ALL AREAS NOT SHOWN TO BE PAVED OR GRAVELED SHALL BE LANDSCAPED (BY OTHERS). 5. CORRIDOR BETWEEN POND AND PARKING LOT SHALL CONSIST OR RETAINING WALLS, SIDEWALK, AND LANDSCAPING. DESIGN BY OTHERS. CONTRACTOR TO COORDINATE TIE-INS WITH CORRIDOR FEATURES. SHEET NO. 24009 JOB NO. DESIGNED APPROVED CHECKED ISSUE DATE REVISIONS 06/27/2025 DRAWN 1 2 3 4 5 D C B MCDOWELL CORPORATE CENTER SHEET TITLE JOB TITLE www.cems-ae.com | Summerville, SC | Wilmington, NC | 843.875.3637 A SITE PLAN CS101 D. FARLEY C. MOORING S. THOMAS D. FARLEY NORTH SCALE: 1" = 30' 30' 0 30' 60' GRAPHIC SCALE 1 1 1 1 1 AS1 TRC COMMENTS 4/13/26 O TH CAROL INA ENGINEERING, INC. CEMS NOITAZIROHTUAFOETACIFITREC C-003 S U 4-13-2026 XXXXXXXXXXXXX X SS SS SS SS SS FM X X X X SS W PL PL PL PL PL PL PL PL PL PLPL PL W W 68'-0" 19'-8" 24'-2" 68'-0" 19'-8" 24'-2"24'-2" 0" 44'-0" 120'-0" 200''-0" 360''-0" 40'-0" 120'-0"130'-0" 40'-0" 53'-10"66'-2" 0" 24'-0" 24'-0" 40'-0" 140'-0" 310'-0" 68 19 24'-2" 24'-2" 120'-0" 200''-0" 53'-10"66'-2" 45'-0" 48'-0" 48'-0" 68'-0" 19'-8" 24'-2"24'-2" " 40'-0" 130'-0" 68 19 48'-0" 110'-0" 170'-0" 60'-0" 40'-0" 20'-0" 20'-0" 40'-0" 40'-0" 40'-0" 30'-0" Clubhouse, Restrooms, Elevator and Stairs 35'-0" 35'-0" 40'-0" 10'-0" 65'-0" 1'-0" 24'-0" 1'-0" 24'-0" 20'-11 3/8" 85'-0" 30'-0" 5'-0" Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 1 of 9 6A. LAND DEVELOPMENT REGULATIONS TEXT AMENDMENT STX-26-2: City staff has initiated a text amendment establishing standa rds for the preparation, review, and required mitigation of transportation impact analyses associated with development. Background: Chapter 20 regulates site-specific development-plan review and the subdivisio n of land. It requires information concerning access, circulation, street s, and related infrastructure, but it does not establish generally applicable thresholds, conten t requirements, or review procedures for traffic studies. Existing traffic-analysis requirements are confined to specific development types or approvals, principally PDD mobility analyses and certain marina developments. Consequently, many substantial or traffic-intensive projects are not re quired to provide a traffic study, whether they involve a subdivision plat or property retained in common ownership. City staff initiated this amendment to establis h a consistent and proportionate framework for evaluating transportation impacts before approval of a preliminary plat or site-specific development plan. The proposed standards apply according to the scale and anticipated traffic of a development rather than its ownership or platting structure. Proposed Changes: The amendment would add a new Article IV, Traffi c Impact Analysis, to Chapter 20 and establish section 20-48. The section would apply to site-spe cific development plans, major subdivisions, and other land-development applications reviewed under Chapter 20, including development on separately platted lots, property retained in common ownership, or a combination of the two. A traffic assessment memorandum would be required for development containing twenty-five (25) to forty-nine (49) dwelling units or generating tw enty-five (25) to ninety-nine (99) new peak-hour trips. A full traffic impact analysis would be required for development containing fifty (50) or more dwelling units, generating one hundred (100) or more new peak-hour trips, or presenting documented access, safety, capacity, cumulative, seasonal, or other transportation conditions warranting full analysis. The amendment also addresses cumulative developm ent and phasing; redevelopment trip credits; exemptions and alternative compliance; preappl ication scoping; professional preparation and accepted methodologies; seasonal traffic counts; required study contents; City and outside-agency review; proportionate mitigation; validity and updates; and appeals. Related amendments to sections 20-7 and 20-32 would require traffi c information and any required st udy with the applicable site- specific development plan or preliminary-plat submittal. The proposed amendment is presented to the Planning Commission for a recommendation to City Council and would appear in the ordinance as follows (new matter underlined; deleted matter struck-through): Section 20-7, Site-specific development plan requirements, is amended by adding subsection (9) to read as follows: (9) Traffic impact analysis. A trip-generation estimate and any traffic assessment memorandum or traffic impact analysis required under section 20-48. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 2 of 9 Section 20-32(b), Plat submission for major subdivision preliminary review requirements, is amended by adding subsection (7) to read as follows: (7) Traffic analysis. Any traffic assessment memorandum or traffic impact analysis required under section 20-48. Chapter 20, Land Development Regulations, is amended by replacing Secs. 20-48—20-49. Reserved, with a new Article IV to read as follows: Secs. 20-48—20-49. - Reserved. ARTICLE IV. TRAFFIC IMPACT ANALYSIS Sec. 20-48. Traffic impact analysis. (a) Purpose and applicability. The purpose of this section is to identify and evaluate transportation impacts associated with proposed land development and to ensure that access, circulation, and transportation improvements are planned in a manner that protects public safety and maintains the reasonable operation of the transportation network. This section applies to preliminary plat, site-specific development plan, phased development plan, or other applicable land development application reviewed under this chapter, whether the proposed development consists of separately platted lots, in-common ownership, or a combination thereof. (b) Definitions. For purposes of this section: 1. New peak-hour trips means the total vehicle trips entering and exiting a development during the highest applicable peak hour, less any credit approved by the city engineer for trips attributable to an existing lawful use of the property. 2. Traffic assessment memorandum means a limited transportation analysis addressing trip generation, access, circulation, safety, and the need for additional study or improvements. 3. Traffic impact analysis means a detailed analysis of existing and projected transportation conditions, development-generated trips, operational and safety impacts, multimodal conditions, and measures necessary to address impacts attributable to the proposed development. (c) Applicability thresholds. 1. A traffic assessment memorandum shall be required for a proposed land development that: a. Contains at least twenty-five (25) but fewer than fifty (50) dwelling units; or b. Is anticipated to generate at least twenty-five (25) but fewer than one hundred (100) new peak-hour trips. 2. A traffic impact analysis shall be required for a proposed land development that: a. Contains fifty (50) or more dwelling units; b. Is anticipated to generate one hundred (100) or more new peak-hour trips; or c. Is determined by the city engineer under subsection (d) to require a traffic impact analysis. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 3 of 9 3. Thresholds shall be determined using the total development proposed or reasonably anticipated at build-out. All phases and related parcels that share access, infrastructure, a common development plan, or common ownership or control shall be evaluated cumulatively. A development shall not be divided into phases, parcels, applications, or ownership entities for the purpose of avoiding the requirements of this section. 4. For redevelopment or a change of use, the city engineer may allow credit for trips generated by a lawful use that is existing and active at the time of application or that was active within the preceding twelve (12) months, when the prior use and its trip generation are documented to the satisfaction of the city engineer. (d) Additional analysis based on documented conditions. Regardless of the thresholds in subsection (c), the city engineer, in consultation with the director of planning and development, may require a traffic assessment memorandum or traffic impact analysis, or may require that a traffic assessment memorandum be expanded to a traffic impact analysis, upon a written determination that one or more of the following conditions are present: 1. The development may create or aggravate an access, sight-distance, intersection, operational, or traffic-safety concern; 2. Principal access is proposed through an existing residential neighborhood or over a street not designed for the type or volume of traffic anticipated; 3. Existing or projected street or intersection capacity is constrained or an existing level-of- service deficiency may be affected by the development; 4. The development may materially affect a designated evacuation route or emergency access; 5. Related development, approved development, or reasonably anticipated development may create a cumulative transportation impact; 6. The proposed use is expected to generate unusual truck, delivery, golf-cart, pedestrian, bicycle, school, event, weekend, or seasonal traffic; 7. The proposed access does not conform to adopted access-management, connectivity, or street-design standards; or 8. A material change in land use, intensity, phasing, access, or circulation has occurred after an earlier transportation analysis or approval. (e) Exemptions and alternative compliance. 1. Minor subdivisions, recombination plats, boundary adjustments, and development below the thresholds in subsection (c) are exempt unless analysis is required under subsection (d). 2. The city engineer may waive or reduce the required level of analysis upon a written determination that an accepted transportation study, current traffic data, or other competent information adequately evaluates the proposed development and surrounding transportation conditions. 3. A project shall not be exempt solely because its access is located on a street maintained by the South Carolina Department of Transportation or another governmental entity. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 4 of 9 (f) Timing and scoping. 1. Before submitting a preliminary plat or site-specific development plan, the applicant shall provide sufficient information for the city engineer to estimate trip generation and determine the required level and scope of analysis. 2. Before preparing the required traffic impact analysis, the applicant and the applicant’s transportation professional shall participate in a scoping conference with city staff. The approved scope may identify the study area, access points, intersections, analysis periods, count locations and dates, background growth, approved developments, horizon years, seasonal adjustments, multimodal elements, and coordination required with other agencies. 3. A required traffic assessment memorandum or traffic impact analysis shall be submitted with the associated preliminary plat or site-specific development plan and accepted as complete before the application is deemed complete for decision. (g) Preparation and methodology. 1. A traffic assessment memorandum or traffic impact analysis shall be prepared under the responsible charge of, signed by, and sealed by a professional engineer licensed in South Carolina with demonstrated experience in transportation engineering. 2. Trip generation shall be estimated using the most recent applicable trip-generation manual, handbook, database, or successor publication issued by the Institute of Transportation Engineers (ITE) or its successor organization. The city engineer may approve locally collected data or another documented methodology when it more accurately represents the proposed use. 3. The analysis shall use the most recent applicable editions of the Highway Capacity Manual and the Manual on Uniform Traffic Control Devices, including any successor publications; current access and roadway-design standards of the South Carolina Department of Transportation or its successor agency; and applicable adopted City plans, manuals, and engineering standards. The city engineer may approve alternative methods, standards, or assumptions when supported by generally accepted transportation-engineering practice. 4. Traffic counts shall be collected on dates and during periods approved by the city engineer. Counts shall represent reasonably typical conditions and shall not be collected during holidays, abnormal events, substantial roadway disruptions, or school breaks when school traffic is relevant. Seasonal adjustment based on city, state, or other accepted data may be required. Summer, weekend, school, restaurant, event, or other special peak periods may be required when relevant to the proposed use or location. (h) Traffic assessment memorandum. A traffic assessment memorandum shall contain, at a minimum, the following information, unless modified by the approved scope: 1. A description of the proposed uses, development intensity, access, phasing, and anticipated build-out; 2. Daily and applicable peak-hour trip generation, including assumptions and any proposed trip reductions or credits; Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 5 of 9 3. The proposed distribution of development traffic and the streets expected to carry such traffic; 4. An evaluation of proposed access points, sight distance, internal circulation, emergency access, and the need for turn lanes or other access improvements; 5. A description of existing roadway characteristics and known safety, operational, or capacity concerns within the area reasonably affected by the development; 6. An evaluation of pedestrian, bicycle, golf-cart, and transit conditions when applicable; 7. Consideration of related or approved development with cumulative effects; and 8. Conclusions and recommendations, including whether a full traffic impact analysis or transportation improvements are warranted. (i) Traffic impact analysis. A traffic impact analysis shall contain, at a minimum, the following information, unless modified by the approved scope: 1. An executive summary identifying significant findings and recommended improvements; 2. A description of the site, proposed and existing uses, development intensity, access, phasing, and anticipated build-out; 3. A study area map identifying affected streets, intersections, access points, traffic-control devices, and multimodal facilities; 4. Existing traffic volumes and transportation conditions, including applicable daily, weekday, weekend, seasonal, school, or special peak periods; 5. Existing, no-build, and build conditions for each required analysis year, including background growth, approved development traffic, and committed transportation improvements; 6. Trip generation, internal capture, pass-by trips, trip distribution, and trip assignment, with all assumptions documented; 7. Capacity and level-of-service analysis for study intersections, roadway segments, and site access points identified in the approved scope; 8. Evaluation of crash history, sight distance, turn-lane needs, signal warrants when applicable, traffic-control devices, and other relevant safety conditions; 9. Evaluation of internal circulation, parking access, loading and service traffic, emergency access, and connectivity to adjoining property; 10. Evaluation of pedestrian, bicycle, golf-cart, transit, and accessibility conditions when applicable; 11. Identification and analysis of improvements or operational measures necessary to address impacts attributable to the development, including the timing and triggering of each improvement; and 12. Supporting traffic counts, calculations, model outputs, references, and other technical documentation necessary to allow independent review. (j) Review and supplemental information. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 6 of 9 1. The city engineer shall review each traffic assessment memorandum and traffic impact analysis for compliance with the approved scope, this section, and accepted professional practice. Acceptance of an analysis means that it is adequate for development review and does not constitute approval of the development or acceptance of its recommendations. 2. The city engineer may require corrections, supplemental data, additional analysis, or reasonable expansion of the study area when necessary to evaluate the proposed development’s impacts. 3. When specialized review is reasonably necessary, the city may obtain independent professional review at the applicant’s expense to the extent authorized by an agreement accepted by the city. 4. When the study area includes facilities maintained by the South Carolina Department of Transportation, Horry County, or another agency, the applicant shall coordinate with that agency as directed by the city engineer. Acceptance by the city does not replace any approval required by another agency. (k) Development conditions and mitigation. 1. Approval of a preliminary plat or site-specific development plan may be conditioned upon access, circulation, safety, operational, connectivity, or multimodal improvements reasonably necessary to address impacts attributable to the proposed development. 2. Required improvements shall be reasonably related and proportionate to the nature and extent of the development’s impacts. An applicant shall not be required to correct an existing transportation deficiency except to the extent an improvement is reasonably necessary and proportionate to address the development’s contribution to or effect upon that deficiency. 3. Conditions may include, as applicable, access relocation or consolidation; turn lanes; intersection modifications; sight-distance improvements; internal circulation changes; street connections or secondary access; approved traffic-control devices; pedestrian, bicycle, golf-cart, transit, or accessibility improvements; right-of-way or easements; and phasing or improvement triggers tied to development activity. 4. Improvements within a right-of-way controlled by another governmental entity are subject to that entity’s approval. No plat or plan approval guarantees approval by another entity. 5. Required improvements shall be completed or financially guaranteed in accordance with this chapter before final plat approval, certificate of occupancy, or another development milestone specified in the approval, as applicable. (l) Validity and updates. 1. Traffic counts generally shall be no more than two (2) years old when an analysis is accepted unless the city engineer determines that older data remains representative or requires more current data because conditions have materially changed. 2. An accepted analysis remains valid with the associated approval unless the approval expires or the city engineer determines that a material change in use, intensity, phasing, access, surrounding development, or transportation conditions warrants an update. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 7 of 9 3. An update may be limited to the portions of the analysis affected by the change unless the city engineer determines that a broader update is necessary. (m) Appeals. A determination made under this section may be appealed in accordance with section 20-8. An appeal shall not authorize the planning commission to waive a requirement imposed by another governmental agency or to substitute its judgment for an engineering standard specifically required by this chapter. Sec. 20-49. Reserved. Applicable Standards § 20-25. – Amendments, of the City’s land development regula tions, authorizes City Council to amend the land development regulations after a public hearing and recommendation from the Planning Commission. Notice of the time and place of the public hearing must be published in a newspaper of general circulation in the City at least thirty (30) days before the hearing. South Carolina Code section 6-29-1130 authorizes the Planning Commission to prepare and recommend land development regulations governin g, among other matters, the coordination of streets and the distribution of traffic in a manner favorable to health, safety, convenience, and the general welfare. The governing authority may ad opt or amend those regulations after a public hearing with at least thirty (30) days' published notice. § 20-12. – Purpose, of the City’s land development regula tions, identifies safe and convenient vehicular and pedestrian access and circulation, the timely provision of streets and other facilities, and orderly development consistent with the Com prehensive Plan as purposes of the City's land development regulations. The Planning Commission's role is to evaluate the proposed amendment and make a recommendation to City Council; City Council retains final legislative authority. Proposed Findings of Fact 1. Procedural Compliance: Notice of the proposed amendment and the November 10, 2026, Planning Commission public hearing was published in the October 1, 2026, edition of the North Myrtle Beach Times. Publication occurred 40 days before the hearing, satisfying the minimum thirty-day publication interval applicable to land development regulations amendments. 2. Existing Regulations: Chapter 20 currently requires site and subdivision information concerning access, circulation, streets, and infrastructure but does not establish generally applicable traffic-study thresholds, minimum study contents, review procedures, or mitigation standards. 3. Applicability: The amendment applies to site-specific development plans, major subdivisions, and other land-development applications reviewed under Chapter 20, whether property is divided into individual lots or retained in common ownership. This approach evaluates transportation impacts based on development intensity and anticipated traffic rather than the form of ownership or whether a subdivision plat is required. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 8 of 9 4. Proportionate Review: The amendment establishes a limited traffic assessment memorandum for moderate development and a full traffic impact analysis for larger development. It also authorizes additional analysis based on a written determination of documented access, safety, capacity, cumulative, seasonal, or similar conditions and allows waiver or reduction when accepted studies, current data, or other competent information adequately evaluate the proposal. 5. Cumulative Development: Thresholds are measured at anticipated build-out and related phases or parcels sharing access, infrastructure, a common development plan, or common ownership or control are evaluated cumulatively. The amendment therefore limits the division of development into separate phases, parcels, applications, or ownership entities to avoid analysis requirements. 6. Technical Standards: Required studies must be prepared under the responsible charge of a South Carolina-licensed professional engineer with transportation experience and use accepted trip-generation, capacity, traffic-control, roadway-design, and locally relevant seasonal methodologies. Scoping allows the City Engineer to tailor the study area, periods, assumptions, multimodal elements, and interagency coordination to the development and location. 7. Timing and Administration: Before submission of a preliminary plat or site-specific development plan, the amendment requires sufficient transportation information for the City Engineer to determine the required level and scope of analysis. Any required traffic assessment memorandum or traffic impact analysis must then be submitted with the associated preliminary plat or site-specific development plan and accepted as complete before the application is deemed complete for decision. 8. Mitigation and Agency Authority: Development approvals may be conditioned on transportation improvements reasonably related and proportionate to impacts attributable to the proposed development. Improvements within another entity's right-of-way remain subject to that entity's approval, and City acceptance of a study does not replace any approval required by the South Carolina Department of Transportation, Horry County, or another agency. 9. Purpose and Legal Basis: The amendment establishes a uniform process for identifying and addressing development-related transportation impacts. It advances the statutory purposes of coordinating streets and distributing traffic in a manner favorable to public health, safety, convenience, and welfare and supports Chapter 20's purposes concerning safe access, circulation, transportation facilities, and orderly development. 10. Relationship to the Comprehensive Plan: Guiding Principle 5 of the 2018 Comprehensive Plan calls for a safe, reliable, and integrated transportation system that balances motor vehicles, pedestrians, bicyclists, and transit and considers land use and transportation infrastructure together. Chapter 6 further supports safe access for all users, increased street connectivity, shared access between adjoining developments, and continued implementation of the City’s Complete Streets initiative. The proposed amendment supports this direction by establishing a consistent process for evaluating development-generated traffic; access, circulation, and connectivity; cumulative and seasonal conditions; transportation safety; and multimodal impacts. It also provides a basis for requiring improvements reasonably Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\STX-26-2 Traffic Studies\STX-26-2 SR.docx Page 9 of 9 related and proportionate to the transportation impacts attributable to proposed development. Planning Commission Action The Planning Commission shall consider the amendment, adopt Findings of Fact, and make a recommendation to City Council. City Council retains final authority over the ordinance amendment. The Planning Commission may recommend approval, recommend approval with modifications or recommendations, recommend denial, or postpone the request to a date certain. The recommendation will be forwarded to City Council, with first reading tentatively scheduled for December 7, 2026, and second reading tentatively scheduled for January 4, 2027. Alternative Motions I move that the Planning Commission adopt the Fi ndings of Fact contained in this report and recommend approval of Land Development Regu lations Text Amendment STX-26-2 to City Council as submitted, applying the standards identified in the report. OR • Recommend approval by adopting modified Findings of Fact. • Recommend approval with additional recommendations by adopting modified Findings of Fact. • Recommend denial by adopting Findings of Fact supporting denial. • Postpone the application to a date certain. Staff Report to Planning Commission – Tuesday, November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\ZTX-26-12 Drones\ZTX-26-12 SR.docx Page 1 of 1 6B. ZONING ORDINANCE TE XT AMENDMENT ZTX-26-12: City staff has initiated a proposed text amendment to establish zoning provi sions for commercial drone facilities, including definitions, permitted locations, approval requ irements, and land-use and site-development standards. Background: The proposed amendment was advertised for Pl anning Commission cons ideration. Following further review of the scope of lawful local regulati on and the policy implications of establishing express zoning permissions for commercial drone fa cilities, staff has elected to withdraw the proposal. The proposed approach would establish locations and standards under which drone facilities could be permitted. Staff determined that this appro ach could be understood as facilitating the establishment of drone facilities rather than providing the pro tections anticipated by the community. Disposition: Staff withdraws Zoning Ordinance Text Amendm ent ZTX-26-12 from further consideration and requests its removal from the agenda. No public hearing, findings, or recommendation on the merits are requested. Any future proposal would be presented through a separate amendment process with applicable public notice. Staff Report to Planning Commission – Tuesday, November 10, 2026 6C. ZONING ORDINANCE TEXT AMENDMENT ZTX-26-13: City staff proposes amendments to the Zoning Ordinance concerning boarding ho uses, including related definitions, permitted zoning districts, and applicable use standards. Background The Zoning Ordinance currently permits boarding houses in the NC, RC, and R-4 districts. Staff is reviewing the definition, district permissions, and standards governing the establishment and conversion of boarding houses. Current Status Staff is expanding the proposed amendment to include procedures for requesting reasonable accommodation under the Fair Housing Act and related relief under a pplicable law. These procedures would apply throughout the Zoning Ordinance, extend ing beyond the boarding-house provisions. Additional public notice is needed before the complete amendment proceeds for substantive consideration. Planning Commission Action Staff recommends postponement to allow publication of the additional notice and completion of staff review. The amendment will return following completion of those steps. No findings or recommendations on the merits are proposed. Recommended Motion I move that the Planning Commission postpone Zoning Ordinance Text Amendment ZTX-26-13 until staff completes the additional public notice and review of the proposed reasonable- accommodation and related provisions. \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\ZTX-26-13 Boarding Houses\ZTX-26-13 SR.docx Page 1 of 1 Staff Report to Planning Commission – November 10, 2026 6D. PRELIMINARY SUBDIVISION PLAT SUB-24-38: A major preliminary plat establishing Farmhouse Circle within a 66-foot private right-of-way through seven existing parcels and creating three additional nonbuilding conservation remnants, for a total of ten parcels, on approximately 239.44 acres off Atlantic Breeze Drive. Background Austin Graham of Development Resource Group, LLC, agent for the owner, has proposed a major preliminary plat to create a private right-of-way through seven existing subdivided parcels creating seven residential lots and three remainder parcels. The 239.44-acre area is undeveloped and consists of seven lots of record accessed from Atlantic Breeze Drive and identified by PINs 349-00-00-0014, 349-00-00-0015, 349-00-00-0017, 357-00-00-0018, 349-00-00-0042, 349-00-00- 0044, and 349-00-00-0041. The properties are zoned Inland Multifamily Residential (R-4I), Resort Residential (R-4), Resort Commercial (RC), and Mid-Rise Multifamily Residential (R-2A) and are subject to recorded conservation easements held by the North American Land Trust. The application was initially submitted on June 24, 2024, and certain project information, including the street name, roadway length, and parcel data, has been updated during review. These updates do not increase the proposed residential development, which remains seven single-family building sites; the three additional parcels are nonbuilding conservation remnants. The preliminary plat and associated construction plans presented for consideration reflect the current proposal and supersede inconsistent descriptive project information in the original application. Proposed Conditions The preliminary plat establishes approximately 5,457 linear feet of private roadway within a 66- foot right-of-way. The resulting configuration contains seven parcels intended for one single- family dwelling each within the recorded Building Zones and three nonbuilding conservation remnants. The plat also depicts associated property-line adjustments and an existing 50-foot public right-of-way proposed for abandonment. Related infrastructure improvements are addressed in the preliminary plat and associated construction plans. Staff Review Planning, Zoning, Public Works, and the Fire Marshal reviewed the preliminary plat and construction plans. No department reported an objection, unresolved technical comment, or requested conditions that would preclude approval. By letter dated October 1, 2026, the North American Land Trust (NALT) acknowledged that the proposed loop road is consistent with the restrictive covenants and reserved rights of the easements. NALT further stated that the road provides acc ess to each parcel, which is a permitted use under each easement. This correspondence has been included in the record for the Planning Commission's consideration. Applicable Standards The Sandridge Tract Development Agreement preserves Land Development Regulations predating adoption of the City’s sketch-plan review requirements. This application is therefore reviewed directly as a preliminary subdivision plat under the regulations applicable through that agreement; separate sketch-plan approval is not required. Section 20-32 requires the preliminary plat to include the specified ownership, location, existing-condition, proposed-condition, site- data, and construction-plan information and requires review by the Zoning Administrator, City \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\SUB-24-38 Farmhouse Tract - Prelim\SUB-24-38 SR.docx Page 1 of 3 Staff Report to Planning Commission – November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\SUB-24-38 Farmhouse Tract - Prelim\SUB-24-38 SR.docx Page 2 of 3 Engineer, and other reviewing departments. The Planning Commission may approve, approve with modifications, or disapprove the plat after affording the subdivider a hearing; its grounds and any conditions must be stated in the record. Approval authorizes construction of site improvements in accordance with the approved preliminary plat but does not override applicable departmental, agency, or private-easement requirements. Preliminary-plat approval remains valid for two years under Section 20-32(a)(4). Proposed Findings of Fact 1. Required preliminary-plat information. The submittal identifies the ownership, property boundaries, existing conditions, proposed lots, private right-of-way, site data, and construction improvements applicable to the subdivision. The Planning Commission finds that the application contains the information required for preliminary review under Section 20-32(b). 2. Subdivision design. The preliminary plat establishes Farmhouse Circle within a 66-foot private right-of-way and results in ten parcels: seven parcels intended for one single- family dwelling each within the recorded Building Zones and three nonbuilding conservation remnants. The three additional parcels do not establish additional residential building sites. 3. Departmental review. Planning, Zoning, Public Works, and the Fire Marshal completed preliminary review. No department reported an objection, unresolved technical comment, or requested condition that precludes approval. 4. Conservation easement. The record includes North American Land Trust’s October 1, 2026, letter acknowledging that the proposed loop road shown on the preliminary plat is consistent with the restrictive covenants and reserved rights of the conservation easements covering the seven original properties. Approval of the preliminary plat does not modify or release those easements or expand the development rights reserved under them. 5. Scope and duration of approval. Approval authorizes the subdivider to construct site improvements in accordance with the approved preliminary plat. It does not override applicable City, state, federal, other agency, or private-easement requirements. Approval is valid for two years as provided by Section 20-32(a)(4). Planning Commission Action The Planning Commission may approve, approve with modifications and/or conditions; or disapprove the preliminary plat. Alternative Motions I move that the Planning Commission adopt the Applicable Standards and Proposed Findings of Fact contained in this report and approve Preliminary Plat SUB-24-38 for the Farmhouse Tract as depicted on the preliminary plat and associated construction plans presented for consideration. OR Staff Report to Planning Commission – November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\SUB-24-38 Farmhouse Tract - Prelim\SUB-24-38 SR.docx Page 3 of 3 • Approve by adopting modified findings of fact. • Approve by adopting modified findings of fact and additional conditions. • Disapprove by adopting findings of fact supporting disapproval. • Postpone the application. SUBDIVISION NAME:Sandridge - Farmhouse Subdivision FinanceAccount Code: 3.21 FEE DUE/PAID: $320.00 on FILE NUMBER: SUB-24-38 Complete SubmittalDate: City of North Myrtle Beach, SC Application for a Major Plat  GENERAL INFORMATION Date of Request: June 24, 2024 Property PIN(S): Property Owner: Arcadian Quay, LLC, Waterway Grove LLC,Seavist Resort, LLC, Sanibel Resort LLC, Lakeshore ResortLLC, Camelia Station LLC, Birkdale Landing LLC Type of Subdivision: Major Preliminary Subdivision  Address or Location: Sandridge Road Project Contact: Austin Graham Contact Phone Number: Contact the Planning Division for Info Contact Email Address: Contact the Planning Division forInfo PROJECT INFORMATION Zoning: Total Area: 239.45 Acres Existing # of Lots: 7 Proposed # of Lots: 7 Total # ofResidential/Commercial Lots:7 Area of Largest Lot:1,936,673 sq. ft. Area of Smallest Lot:1,165,313 sq. ft. Linear Feet of New Streets:5,326 Total # of Common/OpenSpace Lots: -1 Total Area of Common/OpenSpace Lots: 1 Total # of Utility Space Lots:1 Total Area of Utility Lots:2,275 Proposed Street Names: Kingbird Lane Are Wetlands Present on Site? No Are Trees Greater than 16" Caliper Present on Site? Yes Is the applicant requesting that Planning Commission authorize the removal of any tree to permit the installation of infrastructure, including trees greater than 24” caliper? No RECORDED COVENANT INFORMATION I hereby certify that the tract(s) or parcel(s) of land to which this approval request pertains is not restricted by any recorded covenant that is contrary to,conflicts with,or prohibits the activity for which approval is sought, as provided in South Carolina Code of Laws (§ 6-29-1145). Applicant's E-signature: Austin Graham This form complies with a state law that took effect on July 1, 2007 (S.C. Code § 6-29-1145) that requires all planning agencies to inquire in anapplication for a permit if the parcel of land is restricted by a recorded covenant that is contrary to, conflicts with, or prohibits the permitted activity. Ifsuch a covenant exists, the agency shall not issue the permit until written confirmation of its release is received. The release must be through the actionof an appropriate legal authority. 1018 2nd Avenue South · North Myrtle Beach, SC 29582 · Telephone: (843) 280-5566 · Facsimile: (843) 280-5581 10/30/26, 9:42 AM about:blank about:blank 1/1 1018 Second Avenue South North Myrtle Beach, SC 29582 Telephone: 843.280.5560 Facsimile: 843.280.5581 Page 1 of 1 CITY OF NO RTH MYRT LE BEACH LETTER OF AGENCY I, , hereby authorize to act as my agent for for the purposes of the above referenced approval. Please have all property owners sign application; disregard additional spaces if not needed. If additional signature lines are required, please duplicate this sheet and bind all sheets together into one document. Nature of Approval Requested: Today’s Date: Property PIN(s): Property Address/Location: Signature Title Signature Title Signature Title Signature Title Signature Title Signature Title Revision Date 05.24.19 October 1, 2026 City of North Myrtle Beach Planning Department 1018 2nd Avenue South North Myrtle Beach, SC 29582 Re: Sandridge Tracts Loop Road Acknowledgement To Whom It May Concern: North American Land Trust (NALT) holds perpetual conservation easements on all seven properties shown on the referenced preliminary plat. Each easement covers the entire parcel: Sanibel Resort, LLC: Deed Book 3880, Page 1524 (December 22, 2015) Seavista Resort, LLC: Deed Book 3881, Page 609 (December 28, 2015) Arcadian Quay, LLC: Deed Book 3972, Page 3051 (December 15, 2016) Lakeshore Resort, LLC: Deed Book 3972, Page 3091 (December 15, 2016) Camellia Station, LLC: Deed Book 3972, Page 3169 (December 15, 2016) Waterway Grove, LLC: Deed Book 3975, Page 2255 (December 28, 2016) Birkdale Landing, LLC: Deed Book 4066, Page 1 (December 11, 2017) Each easement reserves to the owner the right to construct one single-family residence or one resort building within the recorded Building Zone on that parcel. Each easement also reserves the right to construct a road or driveway providing access to the Conservation Area, in a location approved by NALT (Section 4.2 of the Sanibel, Seavista, Arcadian Quay, Lakeshore, Camellia Station, and Waterway Grove easements; Section 4.3 of the Birkdale Landing easement). NALT has reviewed the proposed loop road shown on the preliminary plat. NALT acknowledges that the loop road, is consistent with the restrictive covenants and reserved rights of the easements. The road provides access to each parcel, which is a use permitted under each easement. Please feel free to contact me with any questions. Sincerely, Alexandria Llewellyn Stewardship Manager N 67° 01' 19" E 948.97' (Total) 66.02'882.95' N 78° 57' 31" E 556.87' N 69° 32' 29" E 1627.85' (Total) 533.70'1094.16' S 08° 45' 05" E 234.35' S 08° 49' 12" E 931.60' S 12° 23' 23" E 236.35' S 69° 28' 06" W 823.28'S 69° 28' 36" WS 69° 28' 19" W 1501.43' (Total)1464.10' (Total) 100.75' 887.45' 475.90' 411.57' 977.71' 112.14' N 24° 32' 42" W 625.39' N 22° 59' 47" W 830.46' N 25° 40' 35" W 260.25' 438.93' (Esmt Tie) 654.67' (Esmt Tie) 1108.60' (Total) S 21° 41' 39" E N 23° 55' 46" W 839.42' (Total) 729.58' (Esmt Tie) N 21° 41' 39" W 1246.08' 835.79' S 68° 19' 38" W N 68° 19' 38" E 835.79' (Total) 807.35' 426.14' S 69° 28' 28" W N 69° 28' 28" E 1260.82' (Total) 1260.82' (Total) 837.19' 423.62' 436.62'824.19' L69L70 L71 S 10° 59' 34" W 14.49' R: 440.00' L: 172.45' Delta: 22° 27' 24" Ch: S67° 10' 15"E 171.35' N 33° 42' 32" E 29.73' R: 454.94' L: 68.26' Delta: 8° 35' 46" Ch: S51° 52' 21"E 68.19' S 47° 34' 28" E 703.87' R: 550.00' L: 157.56' Delta: 16° 24' 50" Ch: S55° 46' 53"E 157.02' R: 550.00' L: 66.04' Delta: 6° 52' 47" Ch: S67° 25' 41"E 66.00' R: 550.00' L: 70.17' Delta: 7° 18' 35" Ch: S74° 31' 22"E 70.12' S 11° 49' 21" W 40.00' R: 590.00' L: 326.53' Delta: 31° 42' 34" Ch: N85° 58' 04"E 322.38' R: 630.00' L: 276.00' Delta: 25° 06' 05" Ch: S44° 49' 32"E 273.80' N 20° 28' 04" W 29.46' N 20° 56' 09" W 125.30' N 23° 08' 55" W 110.56' S 24° 32' 42" E 631.53' S 22° 59' 47" E 837.12' S 68° 19' 38" W 775.15' N 23° 55' 46" W 94.60' (Esmt Tie) N 76° 15' 39" E 302.59' N 68° 18' 15" E 554.59' N 76° 15' 39" E 300.94' N 68° 18' 15" E 555.63' 15.00' R: 132.00' L: 111.90' Delta: 48° 34' 09" Ch: S45° 58' 43"E 108.58' R: 132.00' L: 95.40' Delta: 41° 24' 34" Ch: N89° 01' 55"E 93.34' R: 66.00' L: 103.65' Delta: 89° 58' 43" Ch: N66° 41' 00"W 93.32' S 21° 41' 39" E 98.98' Property Line To Be Deleted S 23° 32' 26" E 33.02' Property Line To Be Deleted S 23° 32' 25" E 153.42' Property Line To Be Deleted N 23° 32' 26" W 1453.13' S 23° 32' 25" E 1350.49' R: 43.38' L: 49.38' Delta: 65° 13' 34" Ch: S79° 03' 35"E 46.76' N 68° 19' 38" E 28.44' N 68° 19' 38" E 1001.39' Property Line To Be Deleted 15.00' S 20° 27' 15" E 1073.60' S 69° 32' 45" W 93.01' S 20° 27' 15" E 416.73' (Total) L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L22 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L36 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L52 L53 L54 L55 L56 L57 L58 L59 L60 L61 L62 L63 N 60° 17' 59" W 183.71' N 15° 46' 42" W 88.63' N 04° 04' 48" W 56.98' N 10° 20' 54" W 39.05' N 13° 27' 44" W 76.24' N 25° 47' 26" W 56.66' N 17° 39' 11" W 97.57' N 12° 16' 10" W 88.89' N 14° 59' 54" E 76.73' N 03° 03' 55" E 68.44' N 18° 16' 26" W 54.65' N 07° 01' 54" E 31.21' N 80° 29' 33" E 467.59' N 80° 29' 33" E 66.88' Property Line To Be Deleted C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 L64 L65 N 09° 29' 41" W 161.58' N 26° 55' 15" W 97.08' S 26° 55' 15" E 125.56' S 28° 00' 48" E 77.17' N 28° 00' 48" W 77.17' L66 L67 L68L72 MONUMENT 548-00 FOUND1/2" IRF 1/2" IRF 1/2" IRF 1/2" IRF 1/2" IRF 1/2" IRF 5/8" IRF 3/4" IPF DIST 5/8" IRF DIST SCDOT R/W MON SCPLS 15177 (2009) N 18° 16' 26" W 44.47' Property Line To Be Deleted N 07° 01' 54" E 24.32' Property Line To Be Deleted 1/2" IRON PIPE SET N:734934.49 E:2700399.83 1/2" IRON PIPE SET N:733633.55 E:2696841.29 N:736187.41 E:2695715.57 R: 492.50' L: 304.60' Delta: 35° 26' 09" Ch: S32° 05' 01"W 299.77' S 14° 21' 56" W 383.37' S 49° 48' 06" W 317.85' (Total) N 14° 21' 56" E 383.37' S 40° 11' 54" E 15.00' R: 507.50' L: 313.88' Delta: 35° 26' 09" Ch: N32° 05' 01"E 308.90' N 49° 48' 06" E 317.85' (Total) 15.00' L74 L75 L76 249.30' 68.55'254.69' 63.17'227.80' 172.99' (Esmt Tie) L73 C19 C20 R: 307.50' L: 323.44' Delta: 60° 15' 55" Ch: N15° 46' 01"W 308.73' R: 292.50' L: 307.66' Delta: 60° 15' 55" Ch: S15° 46' 01"E 293.67' L77 L78 L79 L80 CURVE TABLE CURVE # C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 RADIUS 183.00' 304.37' 346.99' 167.00' 167.00' 142.00' 67.00' 633.00' 109.38' 109.38' 567.00' 133.00' 208.00' 233.00' 233.00' 280.99' 370.37' 25.00' 65.00' 31.00' LENGTH 158.06' 78.93' 96.60' 21.78' 32.19' 195.71' 101.46' 250.64' 37.26' 87.26' 224.51' 201.41' 286.68' 32.11' 43.20' 78.23' 96.05' 35.00' 112.56' 29.48' DELTA 49° 29' 18" 14° 51' 30" 15° 57' 03" 7° 28' 25" 11° 02' 42" 78° 58' 09" 86° 45' 57" 22° 41' 12" 19° 30' 59" 45° 42' 35" 22° 41' 12" 86° 45' 57" 78° 58' 09" 7° 53' 46" 10° 37' 21" 15° 57' 03" 14° 51' 30" 80° 12' 51" 99° 13' 13" 54° 28' 59" CHORD S 2° 10' 36" E 153.20' S 19° 29' 30" E 78.71' S 20° 02' 16" E 96.29' S 24° 16' 36" E 21.77' S 15° 01' 02" E 32.14' S 29° 59' 23" W 180.59' N 67° 08' 34" W 92.04' N 35° 06' 12" W 249.01' N 56° 12' 17" W 37.08' N 88° 49' 04" W 84.96' S 35° 06' 12" E 223.04' S 67° 08' 34" E 182.71' N 29° 59' 23" E 264.52' N 13° 26' 34" W 32.08' N 22° 42' 08" W 43.14' N 20° 02' 16" W 77.97' N 19° 29' 30" W 95.78' N 13° 11' 10" E 32.21' N 3° 40' 59" E 99.01' N 19° 54' 15" W 28.38' LINE TABLE LINE # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 DIRECTION S39° 18' 39"E S58° 05' 35"E S63° 15' 44"E S64° 05' 18"E S57° 23' 29"E S75° 47' 04"E S78° 46' 50"E S80° 14' 53"E N81° 11' 10"E S61° 10' 34"E S56° 18' 53"E S57° 06' 18"E S76° 12' 04"E S68° 45' 53"E S73° 34' 25"E S74° 35' 11"E S80° 29' 40"E S74° 44' 52"E S75° 41' 44"E S73° 54' 09"E LENGTH 12.74 28.97 28.18 30.98 29.39 37.18 33.56 30.58 43.73 30.64 32.36 27.58 27.50 23.30 29.78 38.34 26.10 33.49 23.31 22.25 LINE TABLE LINE # L21 L22 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L36 L37 L38 L39 L40 DIRECTION S52° 00' 25"E S44° 58' 59"E S53° 40' 03"E S62° 17' 34"E S63° 06' 32"E S67° 13' 05"E S67° 45' 52"E S75° 16' 23"E S75° 16' 23"E S80° 47' 37"E S80° 28' 21"E S67° 52' 13"E S64° 58' 49"E S70° 35' 35"E S77° 13' 01"E S84° 10' 45"E S89° 46' 26"E N86° 55' 49"E N83° 53' 16"E N82° 29' 22"E LENGTH 22.14 23.82 26.23 27.59 24.36 24.20 23.04 4.66 21.50 33.50 21.69 22.03 115.54 14.19 22.73 26.92 30.41 29.13 42.17 34.27 LINE TABLE LINE # L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L52 L53 L54 L55 L56 L57 L58 L59 L60 DIRECTION N81° 19' 57"E N65° 24' 33"E N65° 43' 56"E N62° 37' 59"E N59° 46' 11"E N64° 28' 44"E N77° 24' 32"E N84° 07' 51"E N72° 01' 42"E N81° 17' 52"E N64° 47' 30"E N64° 47' 30"E N53° 06' 21"E S52° 52' 17"E S81° 54' 27"E N64° 51' 43"E N41° 29' 19"E N22° 51' 47"E N19° 44' 42"E N12° 13' 58"E LENGTH 35.43 26.48 28.00 33.87 25.18 23.07 20.96 18.88 56.76 64.73 29.40 51.32 37.13 21.54 20.11 38.70 29.66 89.98 61.88 42.36 LINE TABLE LINE # L61 L62 L63 L64 L65 L66 L67 L68 L69 L70 L71 L72 L73 L74 L75 L76 L77 L78 L79 L80 DIRECTION N1° 55' 38"W N16° 24' 28"W N80° 29' 33"E S18° 16' 26"E N23° 32' 25"W S22° 34' 03"W S9° 29' 41"E N23° 45' 36"W N46° 26' 48"W S46° 26' 48"E S46° 26' 48"E S23° 45' 36"E N7° 20' 14"E N44° 06' 02"E N45° 53' 58"W S45° 53' 58"E S21° 41' 39"E S68° 18' 21"W S21° 41' 39"E N68° 18' 21"E LENGTH 24.24 47.74 128.66 120.82 245.37 61.68 161.58 43.85 233.74 104.78 128.95 43.85 23.56 42.86 126.05 188.27 70.00 57.00 66.00 57.00 ~ S I T E ~ Highway 31 Atlantic Intracoastal Waterway Robert Edge Pkwy U.S. Highway 17 ~ V I C I N I T Y M A P N.T.S. ~ Myrtle Beach, SC 29577 Telephone: 843-839-3350 www.drgpllc.com 4703 Oleander Drive SPACE RESERVED FOR PLANNING APPROVAL ONLY 200 100 200 400 800 200 mike@drgpllc.com Development Resource Group, LLC Michael D. Oliver, P.L.S. No. 13520 as agent 20153 NOTES: Tax Parcel: PIN: 349-00-00-0044 Owner of Record: Lakeshore Resort, LLC 2002 N Oak St #200 Myrtle Beach, SC 29577 Last property transfer Deed Book 3935, Page 1045. Tract 1A & Parcel 6 Reference Plat Book 271 Page 104. Tax Parcel: PIN: 349-00-00-0041 Owner of Record: Sanibel Resort, LLC 2002 N Oak St #200 Myrtle Beach, SC 29577 Last property transfer Deed Book MC1701, Page 090817. Parcel A, B, D & E & Parcel 7 Reference Plat Book 267 Page 180. Tax Parcel: PIN: 349-00-00-0042 Owner of Record: Seavista Resort, LLC 2002 N Oak St #200 Myrtle Beach, SC 29577 Last property transfer Deed Book MC1701, Page 111144. Remainder & Parcel 8 Reference Plat Book 267 Page 264. Tax Parcel: PIN: 349-00-00-0017 TMS: 143-00-01-019 Owner of Record: Waterway Grove, LLC 2002 N Oak St #200 Myrtle Beach, SC 29577 Last property transfer Deed Book MC1712, Page 010201. Parcel 3 Reference Plat Book 271 Page 207. 1a. Tax Parcel: PIN: 357-00-00-0018 Owner of Record: Arcadian Quay, LLC 2002 N Oak St #200 Myrtle Beach, SC 29577 Last property transfer Deed Book MC1712, Page 010213. Parcel 4 Reference Plat Book 271 Page 207. Tax Parcel: PIN: 349-00-00-0014 TMS: 143-00-01-018 Owner of Record: Birkdale Landing, LLC 2002 N Oak St #200 Myrtle Beach, SC 29577 Last property transfer Deed Book 4064, Page 106. Parcel 5 Reference Plat Book 271 Page 207. Tax Parcel: PIN: 349-00-00-0015 TMS: 143-00-01-046 Owner of Record: Camellia Station, LLC 2002 N Oak St #200 Myrtle Beach, SC 29577 Last property transfer Deed Book 3938, Page 3213. Parcel 2 Reference Plat Book 271 Page 207. L E G E N D IRON PIPE FOUND (IPF) IRON PIPE SET (IPS) WATER OVERHEAD POWER IRON REBAR FOUND (IRF) MONUMENT FOUND CERTIFICATE OF OWNERSHIP AND DEDICATION The undersigned hereby acknowledge that I am (we are) the owner(s) of the property shown and described hereon and that I(we) hereby adopt this plat with my(our) free consent and that I(we) hereby dedicate all items as specifically shown or indicated on said plat. Name Signed Date Name Signed Date Name Signed Date Name Signed Date Name Signed Date Name Signed Date Name Signed Date PRELIMINARY PLAT OF FARMHOUSE TRACT 239.44 ACRES NORTH MYRTLE BEACH, HORRY COUNTY, SOUTH CAROLINA PREPARED FOR: ECOVEST CAPITAL 2. 3. 4. 5. 6. 7. 9. 10. Declaration is made to original purchaser of the survey. It is not transferable to additional institutions or subsequent owners. Surveyor has made no investigation or independent search for easements of record, encumbrances, restrictive covenants, ownership title evidence, or any other facts that an accurate and current title search may disclose. Subsurface and environmental conditions were not examined or considered as a part of this survey. No statement is made concerning the existence of underground or overhead containers or facilities that may affect the use or development of this tract. 1/2" Iron Pipes Set at all corners unless noted otherwise. All Bearings are based upon the South Carolina State Plane Coordinate System (NAD83)(2011). All distances shown are Horizontal not grid distances. This survey is only valid if print of same has original signature and embossed seal of the surveyor. 8. This property is subject to all easements or restrictions of record. 50' Public R/W to be Abandoned (collectively the "Easement Plats") referenced in Deed Book 3938 Deed Page 3221 and further referenced in Plat Book 267 / 180, 264 and Plat Book 271 / 104, 207. This property appears to be located in Flood Zone "X" & "(AE 10)" According to FEMA flood zones per F.I.R.M. 45051C 0604 K, dated Dec. 16th, 2021. This property does not appear to be the located in Horry County supplemental flood zone; Reference to Ordinance filed in Deed Book 4442 at page 2393. Any Flood zone lines shown hereon are based on provided data. This plat is not the basis for flood zone determination or flood zone related issues. "I hereby certify that the plat shown hereon has been found to comply with the Land Development Regulations for Horry County, South Carolina, and that it has been approved for recording in the office of the Office of Register of Deeds. Planning Signature Date Engineering Signature Date CERTIFICATE OF APPROVAL FOR RECORDING Hatched Area Represents the BUILDING ZONE AREA Previously Referenced by said Deed Book and Page It is hereby certified that this plat is true and correct to the accuracy required in division 4, section 20-35(c), degree of accuracy "1:10,000". "I hereby state that to the best of my professional knowledge, information, and belief, the survey shown hereon was made in accordance with the requirements of the Standards of Practice Manual for Surveying in South Carolina, and meets or exceeds the requirements for a Class A survey as specified therein; also there are no visible encroachments or projections other than shown." Highway 31 Old Sanders Dr.(f.k.a. Sandridge Rd.)(Public R/W Varies) Robert Edge Pkwy. Proposed Atlantic Breeze Drive (Public R/W Varies) Atlantic Breeze Drive (Private R/W Varies) NE/S Sandridge Rd Ext; New Parcel 4.15 Acres PIN: 349-14-02-0005 Current Owner CS Coastal, LLC D.B. 4673 Pg. 443 M B Connector/Sandridge; Lot 3 PIN: 349-00-00-0055 Current Owner Canal Land & Timber, LLC PIN: 349-15-04-0020 Current Owner Dennis Smith D.B. 4194 Pg. 2105 PIN: 349-15-04-0015 Current Owner David Labarr D.B. 4201 Pg. 2961 PIN: 349-15-04-0014 Current Owner Richard Briggs D.B. 4078 Pg. 1052 PIN: 349-15-04-0013 Current Owner Israel Nieves D.B. 5063 Pg. 2890 PIN: 349-15-04-0012 Current Owner Reneau Eaton D.B. 4194 Pg. 1589 PIN: 349-15-04-0011 Current Owner Elizabeth Ann Poe D.B. 5135 Pg. 2593 PIN: 349-15-04-0021 Current Owner Lorinda Bewley D.B. 5095 Pg. 1219 PIN: 349-15-04-0022 Current Owner Daniel D'Elia D.B. 3835 Pg. 1081 PIN: 357-02-01-0029 Current Owner Gilbert Przybyiski D.B. 4064 Pg. 2920 PIN: 357-02-01-0030 Current Owner Jason Davis D.B. 4176 Pg. 1511 PIN: 357-02-01-0031 Current Owner Joshua Bewley D.B. 5084 Pg. 3109 PIN: 357-02-01-0015 Current Owner Nancy Vetter D.B. 4788 Pg. 287 PIN: 357-02-01-0014 Current Owner Nicholas Jebaily D.B. 4777 Pg. 2262 SC Hwy 31; Tract 1 Remainder PIN: 349-00-00-0050 Current Owner Pelican Crossing Developers, LLC D.B. 4653 Pg. 2593 SC Hwy 31; Tract 1 PIN: 349-00-00-0051 Current Owner Pelican Bay Development, Inc. RobertEdge Pkwy. On SW Side Old Ocean; Drive PIN: 349-14-02-0002 TMS: 144-00-01-026 Current Owner The Holy Temple C/O Josephs Missionary Baptist D.B. 3036 Pg. 30 M B Connector/Sandridge; Lot 3 PIN: 349-00-00-0055 Current Owner Canal Land & Timber, LLC Blue Heron Retreat Townhomes HPR PIN: 349-00-00-0053 Current Owner Blue Heron Treat Townhomes HPR c/o Blue Heron Retreat Townhomes HOA D.B. 4976 Pg. 3165 Atlantic Intracoastal Waterway Building Zone Ref: D.B. 3972 Pg. 3169 Building Zone Ref: D.B. 4066 Pg. 1 Building Zone Ref: D.B. 3972 Pg. 3051 Building Zone Ref: D.B. 3975 Pg. 2255 Building Zone Ref: D.B. 3881 Pg. 609 Building Zone Ref: D.B. 3880 Pg. 1524 Building Zone Ref: D.B. 3972 Pg. 3091 Flood Zone AE (EL 10) Flood Zone AE (EL 10) Flood Zone X Flood Zone X Flood Zone X (Shaded) Flood Zone X (Shaded) Flood Zone AE (EL 10) Flood Zone X (Shaded) Flood Zone X (Shaded) Flood Zone X Flood Zone X Flood Zone X Floodzone Line (Typ) Floodzone Line (Typ) Floodzone Line (Typ) Floodzone Line (Typ) Floodzone Line (Typ) Flood Zone X Flood Zone X Floodzone Line (Typ) Floodzone Line (Typ) (100' S.C.P.S.A. Right-of-Way) (100' S.C.P.S.A. Right-of-Way) Flood Zone AE (EL 10) 1b. 1c. 1d. 1e. 1f. 1g. Flood Zone X Remainder Parcel 4 PIN: 357-00-00-0018 Current Owner Arcadian Quay, LLC New Area 1,315,742 sq.ft 30.21 Acres Remainder Parcel 3 PIN: 349-00-00-0017 TMS: 143-00-01-019 Current Owner Waterway Grove, LLC New Area 1,292,452 sq.ft 29.67 Acres Remainder PIN: 349-00-00-0042 Current Owner Seavista Resort, LLC New Area 831,724 sq.ft 19.09 Acres Remainder Parcel A, B, D & E PIN: 349-00-00-0041 Current Owner Sanibel Resort, LLC New Area 1,094,966 sq.ft 25.14 Acres Remainder Tract 1A PIN: 349-00-00-0044 Current Owner Lakeshore Resort, LLC New Area 1,660,816 sq.ft 38.13 Acres Remainder Parcel 2 PIN: 349-00-00-0015 TMS: 143-00-01-046 Current Owner Camellia Station, LLC New Area 1,936,673 sq.ft 44.46 Acres Remainder Parcel 5 PIN: 349-00-00-0014 TMS: 143-00-01-018 Current Owner Birkdale Landing, LLC New Area 1,289,757 sq.ft 29.61 Acres A Portion Of PIN: 349-00-00-0014 91,130 sq.ft. 2.09 Acres Proposed 66' Private Right-of-Way A Portion Of PIN: 357-00-00-0018 2,895 sq.ft. 0.07 Acres Proposed 66' Private Right-of-Way A Portion Of PIN: 349-00-00-0015 32,474 sq.ft. 0.75 Acres Proposed 66' Private Right-of-Way A Portion Of PIN: 349-00-00-0017 32,500 sq.ft. 0.75 Acres Proposed 66' Private Right-of-Way A Portion Of PIN: 349-00-00-0042 97,169 sq.ft. 2.23 Acres Proposed 66' Private Right-of-Way A Portion Of PIN: 349-00-00-0041 56,861 sq.ft. 1.31 Acres Proposed 66' Private Right-of-Way A Portion Of PIN: 349-00-00-0044 45,135 sq.ft. 1.04 Acres Proposed 66' Private Right-of-Way County Limits Line City Limits Line County Limits LineCity Limits Line County Limits Line City Limits Line Existing Pond 20' Public Drainage Easement Plat Book 302 Page 330 Common Area 4 D.B. 4507 Pg. 41 Pelican Bay Lakes Atlantic Breeze Drive (50' Public Right-of-Way) Plat Book 302 Page 330 15' GSWSA Utility Easement See Note 10 See Note 10 See Note 10 See Note 10 See Note 10 See Note 10 15' GSWSA Utility Easement 15' GSWSA Utility Easement Edge of Gravel Edge of Gravel Edge of Gravel Edge of Gravel Edge of Gravel Edge of Gravel Farmhouse Circle (66' Private Right-of-Way) Farmhouse Circle (66' Private Right-of-Way) Farmhouse Circle (66' Private Right-of-Way) Farmhouse Circle (66' Private Right-of-Way) Farmhouse Circle (66' Private Right-of-Way) TOTAL - SUBDIVISION DATA TOTAL TRACT 239.44 acres 10,429,873 sq.ft. TOTAL PRIVATE RIGHT OF WAY 8.22 acres 358,164 sq.ft. TOTAL COMMON AREA 0 acres 0 sq.ft. TOTAL PRIVATE LOTS 231.22 acres 10,071,709 sq.ft. FARMHOUSE CIRCLE (Private) 5,457 lf TOTAL LINEAR FEET OF PRIVATE STREETS 5,457 lf TOTAL # EXISTING LOTS 7 TOTAL # PROPOSED LOTS 10 SMALLEST LOT (Parcel 7) 92,290 sq.ft. LARGEST LOT (Parcel 2) 1,936,673 sq.ft. GROSS LOT DENSITY 0.04 LOTS PER ACRE NET LOT DENSITY 0.04 LOTS PER ACRE Existing Zoning: R-4I Existing Zoning: R-4I / R-4 / RC Existing Zoning: R-4 / RC Existing Zoning: R-4 / R-2A Existing Zoning: R-4 / R-2A Existing Zoning: R-4I / R-4 Existing Zoning: R-4I End SCDOT R/W Per D.B. 3398 Pg. 1340 Sandridge Road Extension (Public R/W Varies) Per P.B. 312, Pg. 26 SCDOT File No. 26.160B Sheet 11 & 19 D.B. 3398, Pg. 1340 Sandridge Loop (Public R/W Varies) Parcel 8 A Portion Of PIN: 349-00-00-0042 335,864 sq.ft. 7.71 acres 91,290 sq.ft. 2.10 acres Parcel 7 A Portion Of PIN: 349-00-00-0041 Parcel 6 A Portion Of PIN: 349-00-00-0044 222,424 sq.ft. 5.11 acres \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\SUB-26-58 GDN Ph 4 - Major Final\SUB-26-58 SR.docx Page 1 of 2 Staff Report to Planning Commission – November 10, 2026 6E. FINAL SUBDIVISION PLAT SUB-26-58: A major final bonded plat of subdivision creating 111 townhouse lots, three open space lots, and private rights-of-way in Phase 4 of Grande Dunes North. Background The Planning Commission recommended approval of the major PDD amendment authorizing this development on February 2, 2021. City Council approved the amendment on second reading on March 15, 2021. The Planning Commission approved the preliminary plat for Phase 4 on January 7, 2025. Existing Conditions Cameron Parker of DRG, agent for the owner, su bmitted the final plat for Phase 4 of Grande Dunes North. The approximately 20.77-acre property is accessed by Brynlee Road, identified by PIN 389-00-00-0007, and zoned Planned Development District (PDD). Currently, the infrastructure is under construction. Proposed Conditions The final plat creates 111 townhouse lots, three open space lots, and private rights-of-way. Townhouse lots range from approximately 2,722 to 8,014 square feet, with a residential density of approximately 5.3 dwelling units per acre. The plat establishes Sawyer Drive within a 50-foot private right-of-way. The proposed lots and setbacks conform to the approved PDD standards, and roadway improvements include sidewalks and street trees consistent with applicable development requirements. Staff Review Planning, Zoning, Public Works, and the Fire Marshal reviewed the final plat and identified no design objection that would preclude approval. Planning identified four minor formatting corrections to be completed before certification for recording. The City Engineer is reviewing the sealed es timate of remaining improvements, and the City Attorney is reviewing the form of the financial guarantee. Applicable Standards Sections 20-33 and 20-36 of the Land Development Regulations require the Planning Commission to determine whether a final plat substantially conforms to the approved preliminary plat; contains the information and certifications required by Section 20-33(b); has received the required departmental review; and has satisfactorily installed or appropriately guaranteed the required subdivision improvements. The Commission may approve, approve with modifications or conditions, or disapprove the final plat. For incomplete improvements, the financial guarantee must be in a form acceptable to the City Engineer and City Attorney and in an amount equal to at least 125 percent of the estimated cost of the remaining required improvements. Required improvements must be completed or satisfactorily guaranteed before final plat approval. Proposed Findings of Fact 1. Prior approval. The Planning Commission approved the preliminary plat for Phase 4 of Grande Dunes North on January 7, 2025. Staff Report to Planning Commission – November 10, 2026 \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\SUB-26-58 GDN Ph 4 - Major Final\SUB-26-58 SR.docx Page 2 of 2 2. Conformance with the approved preliminary plat. The final plat delineates individual lots within the townhouse development area shown on the approved preliminary plat, retaining the approved 111 dwelling units. The final plat substantially conforms to the approved development layout. 3. Required final-plat information. The final plat contains the information required by Section 20-33(b) applicable to this subdivision, subject to completion of the identified formatting corrections, final certifications, and required recordation documents. 4. Departmental review. Planning, Zoning, Public Works, and the Fire Marshal reviewed the final plat. Remaining plat comments are limited to minor formatting corrections to be completed before certification for recording. 5. Required improvements and financial guarantee. Infrastructure remains under construction. The submitted sealed estimate identifies $712,756.00 in remaining improvements, resulting in a financial guarantee of $890,945.00 at 125 percent. Review of the cost estimate and guarantee form remains pending; the required guarantee must be accepted and provided in accordance with Sections 20-33 and 20-36. Conditions of Approval 1. Before certification of the final plat for recording, the applicant shall complete the identified formatting corrections and required final certifications and recordation documents. 2. The applicant shall provide the executed financial guarantee in a form acceptable to the City Engineer and City Attorney and in an amount equal to at least 125 percent of the City Engineer-approved estimate of remaining improvements, in accordance with Sections 20-33 and 20-36. The final plat shall not be certified for recording until the required guarantee has been accepted by the City. Planning Commission Action The Planning Commission may approve, approve with modifications and/or conditions, or disapprove the final plat. Approval authorizes certification and recordation subject to the conditions of approval. The plat must be re corded within 60 days of Planning Commission approval pursuant to Section 20-33(a)(3). Alternative Motions I move that the Planning Commission adopt the Applicable Standards and Findings of Fact contained in this report and approve the Final Plat for Grande Dunes North Phase 4 [SUB-26- 58], subject to the conditions contained herein. OR • Approve by adopting modified Findings of Fact. • Approve by adopting modified Findings of Fact and additional conditions. • Deny by adopting Findings of Fact supporting denial. • Postpone the application to a date certain. SUBDIVISION NAME:Grande Dunes North Phase 4 Subdivision FinanceAccount Code: 3.21 FEE DUE/PAID: $0.00 on FILE NUMBER: SUB-26-58 Complete SubmittalDate: City of North Myrtle Beach, SC Application for a Major Plat  GENERAL INFORMATION Date of Request: October 9, 2026 Property PIN(S): 38900000007 Property Owner: GDN Group, LLC Type of Subdivision: Major Final Subdivision  Address or Location: Grande Dunes North Village Project Contact: Cameron Parker Contact Phone Number: Contact the Planning Division for Info Contact Email Address: Contact the Planning Division forInfo PROJECT INFORMATION Zoning: Total Area: 20.77 Acres Existing # of Lots: 1 Proposed # of Lots: 116 Total # ofResidential/Commercial Lots:111 Area of Largest Lot: 8,014 sq.ft. Area of Smallest Lot: 2,722sq. ft. Linear Feet of New Streets:2,031 Total # of Common/OpenSpace Lots: 3 Total Area of Common/OpenSpace Lots: 9.41 Total # of Utility Space Lots:1 Total Area of Utility Lots: 900 Proposed Street Names: Are Wetlands Present on Site? No Are Trees Greater than 16" Caliper Present on Site? Yes Is the applicant requesting that Planning Commission authorize the removal of any tree to permit the installation of infrastructure, including trees greater than 24” caliper? No RECORDED COVENANT INFORMATION I hereby certify that the tract(s) or parcel(s) of land to which this approval request pertains is not restricted by any recorded covenant that is contrary to,conflicts with,or prohibits the activity for which approval is sought, as provided in South Carolina Code of Laws (§ 6-29-1145). Applicant's E-signature: Cameron Parker This form complies with a state law that took effect on July 1, 2007 (S.C. Code § 6-29-1145) that requires all planning agencies to inquire in anapplication for a permit if the parcel of land is restricted by a recorded covenant that is contrary to, conflicts with, or prohibits the permitted activity. Ifsuch a covenant exists, the agency shall not issue the permit until written confirmation of its release is received. The release must be through the actionof an appropriate legal authority. 1018 2nd Avenue South · North Myrtle Beach, SC 29582 · Telephone: (843) 280-5566 · Facsimile: (843) 280-5581 DWG NAME: P:\23300 - GDN GROUP\21304 - FREEHOLD - GRANDE DUNES NORTH PHASE 4\SURVEY\_SURVEY CAD DRAWINGS\23.304 PH4 BONDED FINAL PLAT.DWG Myrtle Beach, SC 29577 Telephone: 843-839-3350 www.drgpllc.com 4703 Oleander Drive philip@drgpllc.com No. 006089 LLC GROUP RESOURCE DEVELOPMENT Development Resource Group, LLC DATEREVISION SHEET 1 OF 3 COVER PAGE FILE: P:/23.304/SURVEY SCALE: 1"= 300' DRAFTED BY: J.A.M. CHECKED BY: P.T.H. DATE: 10-23-2026 JOB No. 23.304 Name: Signature: Date: hereon and that I (We) hereby adopt this plan of subdivision with my (our) free consent, establish minimum building lines and dedicate all streets, alleys, walks, parks and other sites to public or private uses as noted. I (We) hereby certify that I am (We are) the owner(s) of the property shown and described GDN GROUP, LLC CERTIFICATE OF APPROVAL FOR PUBLIC WATER AND SEWER SYSTEMS We Grand Strand Water & Sewer Authority certify that the water supply and/or sewer disposal system(s) installed or proposed for installation, fully meet our requirements. Name: Signature: Date: GRAND STRAND WATER & SEWER AUTHORITY CERTIFICATE OF OWNERSHIP AND DEDICATION City Engineer Date CERTIFICATE OF APPROVAL OF STREETS AND STORM DRAINAGE SYSTEM: I hereby certify that the streets and storm drainage system, meeting the full requirements of the city's subdivision regulations, have been installed or that a guarantee of the installations of the required improvements in an amount or manner acceptable to the City of North Myrtle Beach has been received. SPACE RESERVED FOR PLANNING APPROVAL ONLY It is hereby certified that this plat is true and correct to the accuracy required in division 4, section 20-35(c), degree of accuracy "1:10,000" "I hereby state that to the best of my professional knowledge, information, and belief, the survey shown hereon was made in accordance with the requirements of the Standards of Practice Manual for Surveying in South Carolina, and meets or exceeds the requirements for a Class A survey as specified therein; also there are no visible encroachments or projections other than shown." Philip T. Hornbeck, P.L.S. No. 40337 as agent Atlantic Intracoastal Waterway BONDED FINAL SUBDIVISION PLAT OF GRANDE DUNES NORTH PHASE 4 BEING A PORTION OF PIN: 389-00-00-0007 CITY OF NORTH MYRTLE BEACH, HORRY COUNTY, SOUTH CAROLINA PREPARED FOR: GDN GROUP, LLC GRID NAD 83 (11) 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0300 300 600 300 1200150 THIS INFORMATION PROVIDED AT THE REQUEST OF NORTH MYRTLE BEACH AND SHOULD NOT BE RELIED UPON FOR LEGAL DETERMINATIONS TOTAL - SUBDIVISION DATA TOTAL TRACT (Excluding Phase 3) 20.77 acres 904,770.00 sf. TOTAL RIGHT OF WAY 2.43 acres 105,858.00 sf. TOTAL COMMON AREA(Excluding Phase 3) 9.41 acres 409,914.00 sf. EXISTING PUMP STATION 0.02 acres 900.00 sf. TOTAL PRIVATE LOTS 8.91 acres 388,098.00 sf. 2,030.84 lf 288.50 lf 1,742.34 lf 111 2,722 sqft 8,014 sqft 5.93 LOTS PER ACRE TOTAL LINEAR FEET OF PRIVATE STREETS BRYNLEE ROAD SAWYER DRIVE TOTAL # OF LOTS SMALLEST LOT (#4061) LARGEST LOT (#4052) GROSS LOT DENSITY SETBACK (PER PDD, DATED JANUARY 7TH, 2021) FRONT YARD 15' SIDE YARD: 5' SIDE YARD CORNER: 10' REAR YARD: 15' 1. 2. 3. NOTES: Tax Parcel: PIN: 389-00-00-0007 TMS: 155-00-01-001 Owner of Record: GDN Group, LLC 330 Patterson Dr Myrtle Beach, SC 29572-4736 REFERENCES: This property appears to be located in Flood Zone "X" , According to FEMA flood zones per F.I.R.M. 45051C 0591 K, dated Dec. 16th, 2021. Any Flood zone lines shown hereon are based on provided data. This plat is not the basis for flood zone determination or flood zone related issues. 4. 5. 6. 7. 9. 10. 11. 12. Declaration is made to original purchaser of the survey. it is not transferable to additional institutions or subsequent owners. Surveyor has made no investigation or independent search for easements of record, encumbrances, restrictive covenants, ownership title evidence, or any other facts that an accurate and current title search may disclose. Subsurface and environmental conditions were not examined or considered as a part of this survey. no statement is made concerning the existence of underground or overhead containers or facilities that may affect the use or development of this tract. Last property transfer deed book 4688, page 3164. 1/2" Iron Pipes Set at all corners unless noted otherwise. All Bearings are based upon the South Carolina State Plane Coordinate System (NAD83)(2011). All distances shown are Horizontal not grid distances. Boundary survey only, no improvements were located at owners request. This survey is only valid if print of same has original signature and embossed seal of the surveyor. 8. This property is subject to all easements or restrictions of record. The roads and drainage within this subdivision are intended to be private and dedicated to the POA, unless otherwise noted on the plat. The roads within this subdivision are to be maintained by POA. There shall be a 10 foot wide non-exclusive utility easement extending along all lot frontage parallel to road right of way. 16. All lakes, ponds, berms, common areas, private drainage easements and open space are to be owned and maintained by the HOA. 15. 13. 14. Date of Field Survey: April, 2024 3. Spoil Easement Release plat for NGD Property I, LLC by this office dated April 4, 2016 and recorded in Plat Book 271 at Page 158. Plat of 60.69 Acre PIN 389-00-00-0006 and 180.77 Acre PIN 389-00-00-0007 into a 241.46 Acre Parcel Dogwood Neck Township, City of North Myrtle Beach, Horry County, South Carolina prepared for: NGD Property I, LLC & NGD Property II LLC, by this office dated August 3rd, 2016. 4. Map of 2 Parcels containing ±18.396 Acres prepared for Coterra Chestnut, LLC by DDC Engineers dated 12/22/16 and recorded at the Horry County register of Deeds in Plat Book 278 Page 297. 5. 2. Plat of Right of Way Dedication 9.59 acres total..., for NGD Property II, LLC by this office dated August 22nd, 2021 and recorded in Plat Book 308 at Page 317. Wetland Map of PIN: 389-00-00-0007 prepared for NGD Property II, llc by this office, dated November 19th, 2020. 6. 1. Final plat of Grande Dunes North Phase 3..., for GDN Group, LLC by this office dated December 11th, 2023 and recorded in Plat Book 318 at Page 99. 19. The lake maintenance easements shown hereon shall be measured 12 feet from the top of bank or from the normal water elevation when the side slopes are 5:1 or flatter, when measured from normal water level, the lake maintenance easement will cover all areas of the pond bank, from the normal water level to the top of bank. If this private easement as required by city of north myrtle beach stormwater department cannot be located with certainty, then the owner of the property burdened by the easement will have the right to determine its location. If the easement location cannot be agreed to, then the location will have to be determined in court. this survey and surveyor, makes no statement as to the parties in favor or burdened, the intent, precise location or use of this easement. Graphical representation of this easement as shown on this plat is for reference only and should not be used to determine the actual location. HOA/POA documents or restrictive covenants and easements for the development shown hereon where recorded in deed book 4689, page 330 on the 6th day of August, 2024 in the office of the register of deeds for Horry County. All areas shown on this plat as open space and / or common area shall remain as such in perpetuity. 20. Proposed pond areas are measured from the top of bank.21. Private drainage easements shall remain clear of all structural obstructions including but not limited to, fencing, garages, sheds, canopies, gazebos, etc. ADDITIONAL NOTES: 1. All drainage easements are to be kept free and clear of all obstructions and mechanical equipment. Fences can run perpendicular through the drainage easement, but not parallel. 2. All private drainage easements are to be owned and maintained by the Home Owners. 3. Home Owners Association or lot owners shall be responsible for maintenance of the side lot drainage swales. The City of North Myrtle Beach shall not be responsible for the maintenance of the side lot drainage swales. 4. Existing Zoning: PDD 5. Per section 23-61 of the City of NMB code requires a separation of 50' from intersections. Lot 401, 408, 409 & 421 will restrict the driveway to the side of the lot furthest away from the intersection to meet this requirement. 6. Reference BZA-25-4 17. 18. Grande Dunes North Village Boulevard Phase 10A PB: 308 Pg: 320 Phase 9A PB: 308 Pg: 319 Phase 2 PB: 310 Pg: 164 Phase 3A & B PB: 318 Pg: 99 Brynlee Rd. Elowen Ln. Grande Dunes North Village Boulevard PIN 389-12-01-0336 Current Owner Meritage Homes of the Carolinas INC D.B. 4837, Pg. 1133 Everlee Ln. Hazel Way Remainder PIN: 389-00-00-0007 TMS: 155-00-01-001 ±42.26 Acres Current Owner GDN Group, LLC C/A No.2 C/A No.3 C/A No.1 Phase 11A PB: 308 Pg: 324 Phase 11A PB: 308 Pg: 323 PIN 389-00-00-0242 Current Owner TLV RE MF V North Myrtle Beach Owner LLC D.B. 4696 Pg. 2509 Amenity Site Bliss Drive Phase 9B PB: 323 Pg: 232 Phase 10B PB: 323 Pg: 233 PIN 390-00-00-1662 Current Owner Meritage Homes of the Carolinas, Inc. D.B. 4829, Pg. 1596 PIN 389-00-00-0010 Current Owner County of Horry D.B. 3308, Pg. 2357 NO. 40337 7. Final plat of Grande Dunes North Phase 9B..., for GDN Group, LLC by this office dated June 26th, 2024 and recorded in Plat Book 323 at Page 232. Phase 1 PB: 328 Pg: 90 Phase 8B PB: 334 Pg: 328Phase 7B PB: 334 Pg: 17 Phase 7B PB: 334 Pg: 17 Phase 10C PB: 323 Pg: 233 Phase 7A-1 PB: ___ Pg: ___ 4.81' 22.99' 478.54'8.05'S 52° 42' 53" W N 52° 42' 53" E18.14' 404.84' N 50° 25' 18" EN 55° 38' 30" E260.36' 280.54'S 55° 38' 30" W22.99' 23.46'N 52° 42' 53" E S 52° 42' 53" W430.88' N 55° 38' 30" E295.36' 265.48'107.56'S 55° 38' 30" W S 37° 17' 07" EN 37° 17' 07" W93.85'172.53'96.40'177.64'91.30'150.19'241.49'S 37° 17' 07" E 2,880 sf.40970.07Ac.2,880 sf.41030.07Ac.5,121 sf.41110.12Ac. 2,880 sf.40130.07Ac.2,880 sf.40080.07Ac.2,880 sf.40030.07Ac. 2,880 sf.40180.07Ac. 50.00'Calc PointN:718262.78E:2671468.38 1/2"IPFN:717197.37E:2670932.44 12' 12' 78.68'81.24'147.50'241.35'N 37° 17' 07" W 2,880 sf.40910.07Ac. 100.00' 5,860 sf.40210.13Ac. 2,880 sf.40860.07Ac.2,880 sf.40800.07Ac. 1/2" Iron Pipe FoundN:718,172.46E:2,671,264.8793.54'N 52° 42' 53" E1/2" Iron Pipe FoundN:717,562.07E:2,670,463.20 1/2" IRON PIPE SETN:717653.05E:2671457.56 S 53° 01' 54" W35.97' C12 C19 N 53° 01' 54" E9.56' C1 N 37° 17' 07" W170.00' S 37° 17' 07" E120.00' N 37° 17' 07" W120.00' N 37° 17' 07" W120.00' S 55° 38' 30" W S 34° 21' 30" E120.00'N 39° 34' 42" W120.00' N 39° 34' 42" W120.00'S 34° 21' 30" E120.00' S 37° 17' 07" E120.00' N 37° 17' 07" W120.00' S 37° 17' 07" E120.00' N 37° 17' 07" W103.33' S 37° 17' 07" E120.00'S 63° 59' 15" W153.29' N 48° 40' 09" W122.88' S 89° 05' 37" W61.87' N 58° 42' 03" W191.15' C17C16 C14C13 C11 C20C21 C22 C23 C9C3 S 52° 42' 53" W300.63' S 38° 34' 39" W399.24'S 52° 42' 53" W107.59' N 55° 30' 24" E232.32' N 55° 38' 31" E L1 C18C2 S 52° 42' 53" W50.00'C10 N 52° 42' 53" E50.03' S 31° 41' 10" E30.00'R: 305.00'L: 33.02'Delta: 6° 12' 07"Ch: S60° 53' 12"W33.00'S 63° 59' 15" W153.29'R: 325.00'L: 49.03'Delta: 8° 38' 40"Ch: N49° 41' 07"E48.99'R: 295.00'L: 44.66'Delta: 8° 40' 26"Ch: S59° 39' 02"W44.62'N 48° 35' 39" W30.82' (Esmt) N 37° 17' 07" W5.11' S 55° 38' 31" WD6D16D1D2D3D4D5 D17D18D19D20D21D22D23D24 D25D26D27D28 10.00' 5.00' 5.00' D29 D3093.85' S 16° 16' 12" E42.96'N 55° 38' 30" E1/2" Iron Pipe FoundN:717,772.84E:2,670,740.02 1/2"IPSN:717198.35E:2670994.30 S 18° 26' 12" E37.39'S 16° 16' 12" E88.37'1/2" Iron Pipe FoundN:718,257.29E:2,671,242.121/2" Iron Pipe FoundN:718,197.27E:2,671,239.0412.00' 20.00' 34.60'24.00'24.00'24.00'34.60'34.60'24.00'24.00'24.00'34.60'34.60'24.00'24.00'24.00'34.60'26.72'24.00'24.00'24.00'45.38' 15.82'24.00'24.00'24.00'23.40'34.60'24.00'24.00'24.00'34.60'34.60'24.00'24.00'24.00'34.60'34.60'24.00'24.00'24.00'11.03' 13.09'24.00'24.00'24.00'21.12' 41.29'24.00'24.00'24.00'23.18'38.25'24.00'24.00'24.00'24.00'38.25'38.25'24.00'24.00'24.00'24.00'38.25'38.25'24.00'24.00'24.00'24.00'38.25' 136.47' 12.25'24.00'24.00'24.00'38.25'38.25'24.00'24.00'24.00'24.00'38.25'38.25'24.00'24.00'24.00'24.00'38.25'21.43'24.00'24.28'24.00'24.00'40.49'34.20'24.00'24.00'24.00'1.35'34.11'24.00'24.00'38.53'37.74'24.00'24.00'24.00'24.00'26.86' 34.11' 47.01'24.00'24.00'24.00'24.00'37.76'38.57'24.00'24.00'13.20'25.16'34.11' 34.11'23.46'24.00'24.00'24.00'34.24'40.51'24.00'24.00'24.00'24.00'51.30'535.64' 1.32' N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 37° 17' 07" W120.00'N 34° 33' 56" W120.01'N 34° 33' 56" W120.01'N 34° 33' 56" W120.01'N 34° 33' 56" W120.01'S 34° 20' 50" E120.00' S 34° 20' 50" E120.00'S 34° 20' 50" E120.00'S 34° 20' 50" E120.00'S 34° 20' 50" E120.00'S 34° 22' 36" E120.00'S 34° 22' 36" E120.00'S 34° 22' 36" E120.00'S 34° 22' 36" E119.72' S 34° 20' 31" E120.00'S 34° 20' 31" E120.00'S 34° 20' 31" E120.00'S 34° 20' 31" E120.00'N 34° 22' 12" W120.03'N 34° 22' 12" W120.02'N 34° 22' 12" W120.02'N 34° 22' 12" W120.00'N 34° 22' 12" W120.00'N 34° 21' 30" W120.00'N 34° 21' 30" W120.00'N 34° 21' 30" W120.00'N 34° 21' 30" W120.00' S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E120.00'S 37° 17' 07" E121.40' 10.81' 4,590 sf.41060.11Ac.2,880 sf.41070.07Ac.2,880 sf.41080.07Ac.2,885 sf.41100.07Ac.2,880 sf.41090.07Ac.4,590 sf.41000.11Ac.2,880 sf.41010.07Ac.4,590 sf.41050.11Ac.2,880 sf.41040.07Ac.2,880 sf.41020.07Ac.4,590 sf.40940.11Ac.2,880 sf.40950.07Ac.4,590 sf.40990.11Ac.2,880 sf.40980.07Ac.2,880 sf.40960.07Ac.5,172 sf.40890.12Ac.2,880 sf.40900.07Ac.4,591 sf.40930.11Ac.2,880 sf.40920.07Ac.5,670 sf.40880.13Ac.4,859 sf.40830.11Ac.2,880 sf.40870.07Ac.4,106 sf.40820.09Ac.4,781 sf.40780.11Ac.2,880 sf.40790.07Ac.2,880 sf.40810.07Ac.4,093 sf.40770.09Ac. 4,093 sf.40320.09Ac.5,120 sf.40310.12Ac.4,985 sf.40200.11Ac.2,880 sf.40190.07Ac.4,423 sf.40160.10Ac.2,880 sf.40170.07Ac.4,152 sf.40150.10Ac.2,880 sf.40140.07Ac.4,152 sf.40110.10Ac.2,880 sf.40120.07Ac.4,152 sf.40100.10Ac.2,880 sf.40090.07Ac.4,152 sf.40060.10Ac.2,880 sf.40070.07Ac.4,152 sf.40050.10Ac.2,880 sf.40040.07Ac.4,046 sf.40010.09Ac.2,880 sf.40020.07Ac. 2,880 sf.40850.07Ac.2,880 sf.40840.07Ac. 4,530 sf.40260.10Ac.2,880 sf.40250.07Ac.2,880 sf.40240.07Ac.2,880 sf.40230.07Ac.2,880 sf.40220.07Ac.4,626 sf.40270.11Ac.2,880 sf.40280.07Ac.2,880 sf.40290.07Ac.2,878 sf.40300.07Ac.C8106.21'111.21' 144.10' C15 13.23' 1/2" Iron Pipe SetN:717,602.08E:2,670,651.831/2" Iron Pipe SetN:717,926.56E:2,671,078.00 D31D32 5.00' 5.00' 5.00' 5.00'5.00'5.00' 5.00' 5.00' CURVE TABLECURVE #C1C2C3C8C9C10C11C12C13C14C15C16C17C18C19C20C21C22C23 RADIUS275.00'25.00'225.00'275.00'275.00'25.00'25.00'225.00'25.00'50.00'50.00'50.00'275.00'25.00'325.00'275.00'325.00'530.00'470.00' LENGTH10.74'37.99'20.50'14.29'10.77'40.55'38.10'11.49'30.77'140.09'64.15'10.00'14.05'40.55'10.73'54.11'105.64'92.80'191.17' DELTA2° 14' 12"87° 04' 23"5° 13' 12"2° 58' 35"2° 14' 37"92° 55' 37"87° 18' 55"2° 55' 37"70° 31' 44"160° 31' 44"73° 30' 44"11° 27' 37"2° 55' 37"92° 55' 37"1° 53' 31"11° 16' 23"18° 37' 28"10° 01' 54"23° 18' 16" CHORDS 36° 10' 03" E 10.73'S 80° 49' 19" E 34.44'N 53° 01' 54" E 20.49'N 51° 54' 36" E 14.28'N 54° 31' 11" E 10.77'S 9° 10' 41" W 36.25'N 80° 56' 34" W 34.52'S 54° 10' 41" W 11.49'S 17° 27' 01" W 28.87'S 62° 27' 01" W 98.56'S 0° 31' 44" E 59.84'S 46° 59' 03" W 9.98'S 54° 10' 41" W 14.05'N 9° 10' 41" E 36.25'S 36° 20' 21" E 10.73'N 58° 21' 04" E 54.02'S 54° 40' 31" W 105.18'N 53° 41' 06" W 92.68'S 47° 02' 55" E 189.85' LINE TABLELINE #L1L2L3L4L5L6L7 DIRECTIONN52° 42' 53"EN31° 41' 10"WN41° 33' 23"EN48° 25' 43"WN41° 34' 17"ES48° 25' 43"ES41° 34' 17"W LENGTH34.208.048.1630.0030.0030.0030.00 L6L7 L5L4L3L2 CCCCCCC LINE TABLELINE #D1D2D3D4D5D6D16D17D18D19D20D21D22D23D24D25D26D27D28D29D30D31D32 DIRECTIONN52° 48' 52"EN37° 11' 08"WN52° 48' 52"EN37° 19' 18"WN37° 20' 08"WS52° 50' 24"WS52° 50' 24"WN37° 17' 07"WS53° 17' 15"WN36° 42' 45"WS53° 17' 15"WS53° 17' 15"WN36° 42' 45"WS53° 17' 15"WN37° 17' 07"WS37° 17' 07"EN52° 42' 53"EN37° 17' 07"WN52° 42' 53"EN55° 43' 13"WN18° 51' 01"WS80° 37' 20"WN18° 51' 01"W LENGTH56.3820.0056.3827.4024.90480.01472.1415.8318.4220.0018.2219.3920.0019.1915.3326.0039.5020.0039.5015.8115.8121.3115.81 DWG NAME:P:\23300 - GDN GROUP\21304 - FREEHOLD - GRANDE DUNES NORTH PHASE 4\SURVEY\_SURVEY CAD DRAWINGS\23.304 PH4 BONDED FINAL PLAT.DWG Myrtle Beach, SC 29577Telephone: 843-839-3350www.drgpllc.com4703 Oleander Drive 1 inch = ft.( IN FEET )GRAPHIC SCALE050255010020050 L E G E N DIron Rebar Found (IRF)Iron Pipe Set (IPS) No. 006089LLCGROUPRESOURCE DEVELOPMENT Development Resource Group, LLC Iron Pipe Found (IPF) DATEREVISIONSHEET 2 OF 3 GRID NAD 83 (11) FILE: P:/23.304/SURVEYSCALE: 1"= 50'DRAFTED BY: J.A.M.CHECKED BY: P.T.H.JOB No. 23.304 Common AreaNo. 262,694 sf.1.44 Ac. Brynlee Road50' Private Right-of-Way Pond "A"135,638 sq.ft.3.11 AcresTo Top ofBank Top of PondBank Top of Pond Bank SeeInset "A" 100' Public DrainageMaintenance& Trail EasementPer P.B. 278, Pg.297 Grande Dunes NorthPhase 3BPer P.B. 318, Pg. 99 Grande Dunes North Village BoulevardPrivate Right-of-Way VariesPer P.B. 308, Pg. 317 Right-of-WayLineto Be Deleted Portion ofRight-of-Way LinePer P.B. 308, Pg.317to Be Abandoned275± sq.ft. (T) (T)(T) (T) (T) (T)(T) (T) (T)(T)(T) philip@drgpllc.com SEE SHEET 3 OF 3 1/2"IPF 1/2"IPF 1/2"IPF Lot 38Lot 40Lot 39Lot 41Lot 42Lot 43Lot 44Lot 45Lot46Lot 47Lot 48Lot 49Lot 50Lot 51Lot 52Lot 53Lot 54Lot 55 Lot 37 12' Private PondMaintenanceEasement 12' Private PondMaintenanceEasement Non-Exclusive VariableWidth Access and UtilityEasementPer P.B. 308, Pg. 317 (T) Sawyer Drive50' Private Right-of-Way SPACE RESERVED FOR PLANNING APPROVAL ONLY Philip T. Hornbeck, P.L.S. No. 40337as agentIt is hereby certified that this plat is true and correct to the accuracy required in division 4,section 20-35(c), degree of accuracy "1:10,000""I hereby state that to the best of my professional knowledge, information, and belief, thesurvey shown hereon was made in accordance with the requirements of the Standards ofPractice Manual for Surveying in South Carolina, and meets or exceeds the requirementsfor a Class A survey as specified therein; also there are no visible encroachments orprojections other than shown." Existing Pump StationPIN: 389-12-04-0001900 sf.0.02 Ac.Per P.B. 308, Pg. 317 (T) S 37° 17' 07" E120.00'1/2"IPF1/2"IPS Inset "A" 30' Ingress and Egress Easement Previously Recorded in Plat Book 308Page 317 To Be Releocated 8,890 sf.0.20 AcresRelocated Variable WidthIngress and Egress EasementPreviously Recorded in Plat Book 308 Page 317a.k.a 30' Ingress and Egress Esmt. N 41° 34' 17" E60.47' R: 275.00'L: 24.06'Delta: 5° 00' 48"Ch: S55° 13' 17"W24.05' (Tie To Easement)S 31° 41' 10" E30.00'S 52° 42' 53" W34.20' 1/2"IPF 1/2"IPF1/2"IPS1/2"IPS (T)Scale 1"=20' N 26° 00' 45" W17.42'S 63° 59' 15" W30.60'(Tie To Esmt.) R: 305.00'L: 33.02'Delta: 6° 12' 07"Ch: S60° 53' 12"W33.00' NO. 40337 Brynlee Rd. 7.29' Common AreaNo. 1183,703 sf.4.22 Ac.Non-JurisdictionalExcluded Waters (b)(5)Per Reference Map #6Non-JurisdictionalExcluded Waters (b)(5)Per Reference Map #6 DATE: 10-23-2026 Calculated Point (CP) Common Area No.1Current Owner:GDN GroupR: 470.00'L: 228.48'Delta: 27° 51' 10"Ch: N21° 28' 12"W226.24'(Tie)1/2"IPF Property Data TableLot No. Current Owner: PIN: DB/PG PB/PG Lot 38 Christian Saniago, ETAL 389-12-04-0061 5096/1594 318/99 Lot 39 NVR INC 389-12-04-0062 5056/252 318/99 Lot 40 James Joseph Heyden389-12-04-0063 5102/1046 318/99 Lot 41 Laurie Lee Hanscomb 389-12-04-0064 4993/3263 318/99 Lot 42 Nancy Louise Datino389-12-04-00655098/3278 318/99 Lot 43 Christopher Scott 389-12-04-0066 5106/188 318/99 Lot 44 Kimberly Beth Mohamed389-12-04-0067 5119/2803 318/99 Lot 45 James J. Smith389-12-04-0068 5044/710 318/99 Lot 46 Chin Ted 389-12-04-0069 5013/3104 318/99 Lot 47 Carmen R. Hufnagel389-12-04-0070 5012/1016 318/99 Lot 48 Dale J. Lubbers 389-11-03-00715013/1386 318/99 Lot 49 Luigi Guiseppe Piccione389-11-03-00725115/3413 318/99 Lot 50 Sandra Lee Sleggs389-11-03-0073 5013/1253 318/99 Lot 51 Lori Ellen Brown389-11-03-0074 4997/2189 318/99 Lot 52 Bennett J. Shuster389-11-03-0075 4995/457 318/99 Lot 53 Eric Thomas Smith 389-11-03-0076 4994/839 318/99 10' Gas Easement(typ) (typ) (typ)10' GasEasement BONDED FINAL SUBDIVISION PLAT OFGRANDE DUNES NORTH PHASE 4BEING A PORTION OF PIN: 389-00-00-0007CITY OF NORTH MYRTLE BEACH, HORRY COUNTY, SOUTH CAROLINAPREPARED FOR:GDN GROUP, LLC10' Utility Easement 10' UtilityEasement10' UtilityEasement 10' Utility Easement Common AreaNo. 3263,240 sf.6.04 Ac.Inclusive of Pond20' Private Drainage Easement20' PrivateDrainageEasement 20' PrivateDrainageEasement POND #3-2 (Chord)(Chord) RemainderPIN: 389-00-00-0007TMS: 155-00-01-001±42.26 AcresCurrent OwnerGDN Group, LLC 12"IPFN:717373.87E:2671222.85 Grande Dunes NorthPhase 7BPB: 334 PG: 17 (Tie)(Tie)(Tie)12' Private PondMaintenanceEasement Common AreaNo. 3263,240 sf.6.04 Ac.Inclusive of Pond PIN 389-12-01-0337Current OwnerMeritage Homes of the Carolina Inc (T)(T) (T) (T)Common AreaNo. 3263,240 sf.6.04 Ac.Inclusive of Pond (Chord)(Chord) 10' GasEasement 10' GasEasement Gas EasementDrainage EasementUtility EasementLake Maintenance Easement 5' GasEasement 5' GasEasement 5' GasEasement 5' GasEasement 10' GasEasement 10' GasEasement10' GasEsmt 10' GasEsmt10' GasEsmt 10' GasEsmt10' GasEsmt 10' GasEsmt10' GasEsmt 10' GasEsmt 10' GasEsmt 10' GasEsmt 22.99' 576.44'N 50° 25' 18" EN 55° 38' 30" E260.36' 280.54'S 55° 38' 30" W22.99' 23.46' 608.47'S 50° 25' 18" W 24.00'140.22'597.66' 19.60'115.96'S 52° 42' 53" W N 50° 25' 18" EN 55° 38' 30" E295.36' 265.48'107.56'S 55° 38' 30" W S 37° 17' 07" EN 37° 17' 07" W93.85'172.53'96.40'177.64'91.30'150.19'241.49'S 37° 17' 07" ES 50° 25' 18" W 8,014 sf.40520.18Ac. 2,880 sf.40180.07Ac. 50.00'50.00'Calc PointN:718262.78E:2671468.38 78.68'81.24'147.50'241.35'N 37° 17' 07" W S 37° 17' 07" E126.00'31.92'94.08' 2,880 sf.40910.07Ac. 2,880 sf.40490.07Ac. 100.00' 100.00'Calc PointN:718384.72E:2671598.93 Calc PointN:718779.67E:2672100.43 5,860 sf.40210.13Ac. 2,880 sf.40860.07Ac.2,880 sf.40800.07Ac.2,880 sf.40750.07Ac.2,880 sf.40700.07Ac.3,900 sf.40630.09Ac.2,724 sf.40600.06Ac. 2,880 sf.40340.07Ac.2,880 sf.40440.07Ac.2,880 sf.40390.07Ac. 1/2" Iron Pipe FoundN:718,172.46E:2,671,264.8793.54'N 52° 42' 53" E 1/2" IRON PIPE SET S 53° 01' 54" W35.97' C5 C19 N 53° 01' 54" E9.56' C6 C1 C4 S 34° 21' 30" E120.00'N 39° 34' 42" W120.00' N 39° 34' 42" W120.00'S 34° 21' 30" E120.00'N 39° 34' 42" W120.00' N 39° 34' 42" W120.00'N 39° 34' 42" W113.23' N 39° 34' 42" W120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00' S 51° 03' 48" W50.02' S 71° 06' 22" E45.41'S 02° 31' 59" E9.46'S 18° 45' 58" E41.50'S 53° 13' 34" E37.74' N 54° 10' 30" EN 44° 12' 47" E79.38'N 49° 08' 30" E99.42'N 54° 27' 09" E245.50'N 50° 12' 38" E180.16'N 50° 01' 34" E213.11'S 26° 21' 20" E47.90'S 71° 06' 22" E50.99'S 20° 16' 36" E26.15'S 02° 31' 59" E17.34'S 18° 45' 58" E16.60'S 53° 13' 34" E24.98'S 46° 18' 10" E43.43'S 34° 29' 09" E28.12' S 37° 17' 07" E50.00'S 52° 42' 53" W55.96'C11 C9C3 S 47° 23' 05" W57.29' S 52° 21' 47" W55.80'S 50° 25' 18" W258.00'S 39° 15' 38" W49.31'S 38° 34' 39" W399.24'S 52° 42' 53" W107.59' N 55° 30' 24" E232.32' S 52° 42' 53" W184.43'C18C2 S 52° 42' 53" W50.00'C10 C7 N 52° 42' 53" E50.03' N 37° 17' 07" W5.11' N 39° 34' 42" W113.75' S 55° 38' 31" WD6 D7 D8 D9D10D11D12D13D14D15D16D1D2D3D4D5 D17D18D19D20D21D22D23D24 10.00' 10.00' 10.00'5.00' 5.00' D29 D3093.85' 48.98' S 16° 16' 12" E42.96'S 18° 26' 12" E37.39' 12" Iron Pipe SetN:718594.53E:2672252.43S 34° 29' 09" E3.31' S 16° 16' 12" E88.37'1/2" Iron Pipe FoundN:718,257.29E:2,671,242.121/2" Iron Pipe FoundN:718,197.27E:2,671,239.04 20.00' 20.00'24.00'24.00'45.38' 15.82'24.00'24.00'24.00'21.12' 41.29'24.00'24.00'136.47' 21.43'24.00'24.28'24.00'24.00'40.49'34.20'24.00'24.00'24.00'1.35'34.11'24.00'24.00'24.00'34.11'34.11'24.00'24.00'24.00'34.11'34.11'24.00'24.00'24.00'34.11'34.11'24.00'24.00'24.00'34.11'24.14'24.02'24.02'24.02' 24.00'24.00'38.53'37.74'24.00'24.00'24.00'24.00'26.86' 34.11'24.00'24.00'24.00'34.11'34.11'24.00'24.00'24.00'34.11'34.11'24.00'24.00'24.00'34.11'26.00'24.00'24.00'24.00'34.80' 47.01'24.00'24.00'24.00'24.00'37.76'38.57'24.00'24.00'13.20'25.16'34.11'24.00'24.00'24.00'34.11'34.11'24.00'24.00'24.00'34.11'34.11'24.00'24.00'34.11'34.80'24.00'24.00'24.00'47.22' 55.88'24.00'24.00'24.00'14.97'35.87'34.11'24.00'24.00'24.00'34.11'34.16'24.06'24.06'21.13'34.11'34.11'24.00'24.00'24.00'34.11'34.11'24.00'24.00'24.00'34.11'23.46'24.00'24.00'24.00'34.24'40.51'24.00'24.00'24.00'24.00'51.30' 103.41'340.92'1.32' N 34° 33' 56" W120.01'N 34° 33' 56" W120.01'S 34° 20' 50" E120.00' S 34° 20' 50" E120.00'S 34° 20' 50" E120.00'S 34° 20' 50" E120.00'S 34° 20' 50" E120.00'S 34° 22' 36" E120.00'S 34° 22' 36" E120.00'S 34° 22' 36" E120.00'S 34° 22' 36" E119.72' S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00'S 39° 34' 42" E120.00' S 39° 34' 42" E118.61'S 39° 34' 42" E117.48'S 39° 34' 42" E116.36'S 39° 34' 42" E115.24'S 39° 34' 42" E114.17'N 39° 34' 42" W113.70'N 39° 34' 42" W113.63'N 39° 34' 42" W113.56'N 39° 34' 42" W113.48'N 39° 34' 42" W115.13'N 39° 34' 42" W117.04'N 39° 34' 42" W118.62'N 39° 34' 42" W120.00'N 39° 34' 42" W120.00' N 39° 34' 42" W120.00'N 39° 34' 42" W120.00'N 39° 34' 42" W120.00'N 39° 34' 42" W120.00'N 39° 34' 42" W120.00'N 39° 34' 42" W120.00'N 39° 34' 42" W120.00'S 34° 20' 31" E120.00'S 34° 20' 31" E120.00'S 34° 20' 31" E120.00'S 34° 20' 31" E120.00'N 34° 22' 12" W120.03'N 34° 22' 12" W120.02'N 34° 22' 12" W120.02'N 34° 22' 12" W120.00'N 34° 22' 12" W120.00'N 34° 21' 30" W120.00'N 34° 21' 30" W120.00' 10.81' 5,172 sf.40890.12Ac.2,880 sf.40900.07Ac.5,670 sf.40880.13Ac.4,859 sf.40830.11Ac.2,880 sf.40870.07Ac.4,106 sf.40820.09Ac.4,781 sf.40780.11Ac.2,880 sf.40790.07Ac.2,880 sf.40810.07Ac.4,093 sf.40770.09Ac.2,880 sf.40760.07Ac.4,093 sf.40730.09Ac.2,880 sf.40740.07Ac.4,093 sf.40680.09Ac.2,880 sf.40690.07Ac.4,093 sf.40720.09Ac.2,880 sf.40710.07Ac.4,093 sf.40670.09Ac.3,864 sf.40620.09Ac.2,722 sf.40610.06Ac.3,878 sf.40580.09Ac.2,726 sf.40590.06Ac.4,083 sf.40570.09Ac.2,752 sf.40560.06Ac. 5,807 sf.40510.13Ac.2,880 sf.40500.07Ac.4,176 sf.40470.10Ac.2,880 sf.40480.07Ac.4,093 sf.40460.09Ac.2,880 sf.40450.07Ac.4,093 sf.40420.09Ac.2,880 sf.40430.07Ac.4,093 sf.40410.09Ac.2,880 sf.40400.07Ac.4,093 sf.40370.09Ac.2,880 sf.40380.07Ac.4,093 sf.40360.09Ac.2,880 sf.40350.07Ac.4,093 sf.40320.09Ac.2,880 sf.40330.07Ac.5,120 sf.40310.12Ac.4,985 sf.40200.11Ac.2,880 sf.40190.07Ac. 2,880 sf.40850.07Ac.2,880 sf.40840.07Ac. 2,865 sf.40660.07Ac.2,828 sf.40650.06Ac.2,806 sf.40540.06Ac.2,779 sf.40550.06Ac. 4,530 sf.40260.10Ac.2,880 sf.40250.07Ac.2,880 sf.40240.07Ac.2,880 sf.40230.07Ac.2,880 sf.40220.07Ac. 2,833 sf.40530.07Ac.2,790 sf.40640.06Ac. 4,626 sf.40270.11Ac.2,880 sf.40280.07Ac.2,880 sf.40290.07Ac.2,878 sf.40300.07Ac.C8 9.03'2.92' 5.15' N 50° 07' 43" E327.96' 106.21'111.21' 144.10' 13.23' S 52° 42' 53" W19.15'D31D32 5.00' 5.00'5.00' 5.00'5.00' 5.00' 10.00' 27.06' (Esmt Tie)N 37° 17' 07" W125.68' CURVE TABLECURVE #C1C2C3C4C5C6C7C9C10C11C18C19 RADIUS275.00'25.00'225.00'275.00'25.00'25.00'25.00'275.00'25.00'25.00'25.00'325.00' LENGTH10.74'37.99'20.50'11.01'23.18'16.09'40.27'10.77'40.55'38.10'40.55'10.73' DELTA2° 14' 12"87° 04' 23"5° 13' 12"2° 17' 35"53° 07' 48"36° 52' 12"92° 17' 35"2° 14' 37"92° 55' 37"87° 18' 55"92° 55' 37"1° 53' 31" CHORDS 36° 10' 03" E 10.73'S 80° 49' 19" E 34.44'N 53° 01' 54" E 20.49'S 51° 34' 06" W 11.00'S 26° 08' 59" W 22.36'S 18° 51' 01" E 15.81'N 83° 25' 54" W 36.06'N 54° 31' 11" E 10.77'S 9° 10' 41" W 36.25'N 80° 56' 34" W 34.52'N 9° 10' 41" E 36.25'S 36° 20' 21" E 10.73' LINE TABLELINE #D1D2D3D4D5D6D7D8D9D10D11D12D13 DIRECTIONN52° 48' 52"EN37° 11' 08"WN52° 48' 52"EN37° 19' 18"WN37° 20' 08"WS52° 50' 24"WN46° 24' 39"EN51° 22' 13"ES37° 17' 07"EN51° 22' 13"EN46° 24' 39"EN46° 24' 39"EN50° 42' 26"W LENGTH56.3820.0056.3827.4024.90480.01182.54253.0520.01251.7186.5346.205.76 LINE TABLELINE #D14D15D16D17D18D19D20D21D22D23D24D29D30 DIRECTIONS38° 34' 39"WN50° 42' 26"WS52° 50' 24"WN37° 17' 07"WS53° 17' 15"WN36° 42' 45"WS53° 17' 15"WS53° 17' 15"WN36° 42' 45"WS53° 17' 15"WN37° 17' 07"WN55° 43' 13"WN18° 51' 01"W LENGTH20.009.46472.1415.8318.4220.0018.2219.3920.0019.1915.3315.8115.81 DWG NAME:P:\23300 - GDN GROUP\21304 - FREEHOLD - GRANDE DUNES NORTH PHASE 4\SURVEY\_SURVEY CAD DRAWINGS\23.304 PH4 BONDED FINAL PLAT.DWG Myrtle Beach, SC 29577Telephone: 843-839-3350www.drgpllc.com4703 Oleander Drive 1 inch = ft.( IN FEET )GRAPHIC SCALE050255010020050 philip@drgpllc.com No. 006089LLCGROUPRESOURCE DEVELOPMENT Development Resource Group, LLCDATEREVISIONSHEET 3 OF 3FILE: P:/23.304/SURVEYSCALE: 1"= 50'DRAFTED BY: J.A.M.CHECKED BY: P.T.H. JOB No. 23.304 Sawyer Drive50' Private Right-of-Way Common AreaNo. 1183,703 sf.4.22 Ac. PropertyLineto beDeletedBrynlee Road50' Private Right-of-Way PIN 389-00-00-0235Current OwnerMeritage Homes of the Caorlinas IncD.B. 4837, Pg. 1133 Grande Dunes NorthPhase 3BPer P.B. 318, Pg. 99 BONDED FINAL SUBDIVISION PLAT OFGRANDE DUNES NORTH PHASE 4BEING A PORTION OF PIN: 389-00-00-0007CITY OF NORTH MYRTLE BEACH, HORRY COUNTY, SOUTH CAROLINAPREPARED FOR:GDN GROUP, LLC(T)(T) (T) (T) (T) (T)(T) (T) (T) (T)(T) GRID NAD 83 (11) SEE SHEET 2 OF 3 1/2"IPF 1/2"IPS 1/2"IPS1/2"IPS1/2"IPS 1/2"IPS1/2"IPS (T) (T) Lot 38Lot 39Lot 37 100' Public DrainageMaintenance& Trail EasementPer P.B. 278, Pg.297 100' Public DrainageMaintenance& Trail EasementPer P.B. 278, Pg.297 DitchbankDitchbankDitchbank Ditchbank Ditchbank SPACE RESERVED FOR PLANNING APPROVAL ONLY Philip T. Hornbeck, P.L.S. No. 40337as agentIt is hereby certified that this plat is true and correct to the accuracy required in division 4,section 20-35(c), degree of accuracy "1:10,000""I hereby state that to the best of my professional knowledge, information, and belief, thesurvey shown hereon was made in accordance with the requirements of the Standards ofPractice Manual for Surveying in South Carolina, and meets or exceeds the requirementsfor a Class A survey as specified therein; also there are no visible encroachments orprojections other than shown." NO. 40337 Brynlee Rd. Common AreaNo. 262,694 sf.1.44 Ac. Non-JurisdictionalExcluded Waters (b)(5)Per Reference Map #6 DATE: 10-23-2026Common Area 3-1Current Owner:GDN GroupPB:____ PG:____ 10' Gas Easement(typ) (typ) (typ) (typ) 10' Gas Easement (T) 10' Utility Easement 10' UtilityEasement 20' Private Drainage Easement20' PrivateDrainageEasement 20' PrivateDrainageEasement20' PrivateDrainageEasement PIN 389-12-01-0337Current OwnerMeritage Homes of the Carolina Inc (Tie) RemainderPIN: 389-00-00-0007TMS: 155-00-01-001±42.26 AcresCurrent OwnerGDN Group, LLC (T) (T) (T) 5' GasEasement 5' GasEasement 5' GasEasement 5' GasEasement10' GasEsmt10' GasEsmt 10' GasEsmt10' GasEsmt10' GasEsmt10' GasEsmt10' GasEsmt 10' GasEsmt10' GasEsmt10' GasEsmt10' GasEsmt10' GasEsmt 5' GasEsmt 10' GasEsmt \\nmbplan\PDFiles\PLANNING\Planning Commission\2026\11.10 Regular Meeting\SUB-26-61 GDN Ph 6A - Major Final\SUB-26-61 SR.docx Page 1 of 2 Staff Report to Planning Commission – November 10, 2026 6F. FINAL SUBDIVISION PLAT SUB-26-61: A major final bonded plat of subdivision creating 12 residential lots and private rights-of-way in Phase 6A of Grande Dunes North. Background The Planning Commission recommended approval of the major PDD amendment authorizing this development on February 2, 2021. City Council approved the amendment on second reading on March 15, 2021. The Planning Commission approved the preliminary plat of the subdivision for this phase on February 17, 2026. Existing Conditions Cameron Parker of DRG, agent for the owner, submitted the final plat for Phase 6A of Grande Dunes North. The approximately 3.16-acre property is accessed by Brynlee Road, identified by PIN 389-00-00-0007, and zoned Planned Development District (PDD). Currently, the infrastructure is under construction. Proposed Conditions The final plat creates 12 residential lots and private rights-of-way. All residential lots are intended for single family residences; the smallest lot is ±6,589 square feet; the largest lot is ± 8,041 square feet. The density of the subdivision is 3.8 dwelling units per acre. The plat establishes Brawley Drive and includes a segment of Brynlee Road, both within 50-foot private rights-of-way, totaling approximately 1,069 linear feet of private streets. The proposed lots and setbacks conform to the approved PDD standards, and roadway improvements include sidewalks and street trees consistent with applicable development requirements. The proposed major final plat is substantially consistent with the previously approved preliminary plat. Staff Review Planning, Zoning, Public Works, and the Fire Marshal reviewed the final plat and identi

Text truncated. Open the original for the full document.

Source: City of North Myrtle Beach website. First collected Nov 10, 2026.