Public Works Committee Meeting june 2022 FINAL
City of Mauldin · Greenville County · meeting of Jun 3, 2022 · Notices
Open the original document More from City of Mauldin
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PUBLIC WORKS
COMMITTEE MEETING
MONDAY, JUNE 6, 2022 | 6 PM
3rd committee meeting
The Committee will meet in Mauldin City Hall at 5 East
Butler Road in the Council Chambers at 6 p.m.
The meeting will be available remotely through Zoom. Please visit the City’s website at
https://cityofmauldin.org/your-government/meeting-minutes-agendas/ to access the
meeting via audio and videoconferencing.
A quorum of Council will be present.
1
PUBLIC WORKS COMMITTEE MEETING
JUNE 6, 2022, 6PM
CITY HALL - COUNCIL CHAMBERS
5 E. BUTLER ROAD
Committee Members: Jason Kraeling (Chair), Carol King, Michael Reynolds
1. Call to Order
2. Public Comment
3. Reading and Approval of Minutes
a.Public Works Committee Meeting: April 4,
2022 [Pages 3-5]
4. Reports or Communications from City Officers
a. Public Works Director Matt Fleahman
Budget Review
5. Unfi
nished Business
There is no unfinished business.
6. New B
usiness
a.Stormwater Task Order [Pages 6-37]
b.Acceptance of Loblolly Circle [Pages 38-39]
c.Mosquito Spraying Program [Page 40]
7. Publ
ic Comment
8. Committee Concerns
9. Adjournment
The Honorable Jason Kraeling
The Honor
able Jason Kraeling
The Honor
able Jason Kraeling
The H
onorable Jason Kraeling
The H
onorable Jason Kraeling
The H
onorable Jason Kraeling
The
Honorable Jason Kraeling
The
Honorable Jason Kraeling
2
MINUTES
PUBLIC WORKS COMMITTEE MEETING
APRIL 4, 2022, 6PM
CITY HALL - COUNCIL CHAMBERS
5 E. BUTLER ROAD
3rd committee meeting
C
ommittee Members: Jason Kraeling (Chair), Carol King, Michael Reynolds
Others present: PW Director Matt Fleahman and City Administrator Brandon Madden
1. C
all to Order- Chairman Kraeling
2. Public Comment
M
ayor Merritt: I reside at 214 Fairfield Drive. As Mayor, I sit on the GPATS policy committee of
approximately 31 members. In my year or so, I have seen our East Butler Road project delayed many
times. I also see the Fix Woodruff Road congestion relief project get assigned priority 1 and continue
to move forward. I wanted to provide you with some data that hopefully you were able to glean in
the limited time you have had this agenda packet.
L
et’s focus on those tangible areas that will affect the citizens of Mauldin.
1. M
iller Road is proposed to be closed and abandoned from appropriately 1221 Miller Road and
South Oak Forest Drive, westward past Frankie’s Fun Park and then to an expanded intersection
just prior to the railroad tracks on to Woodruff Road as well as right onto Park Woodruff Road.
T
his will have entrance to Frankie’s Fun Park, At Home, Hamrick’s and on to IHOP. There are no
red lights planned at Woodruff Road.
2. A new traffic circle is planned to take traffic toward former South Oak Forest Drive into Oak Forest
a
nd Pine forest. If you look online at the revised proposal, you will notice the Woodruff Road
congestion relief bringing potentially more thru traffic to the entranceways to Pine Forest and Oak
Forest.
D
oes that fit our residents in these tranquil neighborhoods?
3. A
ll eastbound Miller Road traffic coming from Mauldin, Five Forks, Corn Road, and Miller would
be forced to negotiate 2 traffic circles in order to get to current Miller Road/Woodruff Road
intersection.
T
here will be 2 new bridges built, one over I85 and the 2nd over I385. There will be five in total new
roundabouts with the same connections to Woodruff Road. Where does the congestion go? Towards
Mauldin on Miller, past the Oak Forest and Pine Forest entranceways and I have not mentioned Smith
Hines Road.
S
everal months ago, GPATS staff, the City of Greenville Mayor and City Administrator, as well as then
current Chair of County Council, requested me and Mr. Madden join them for a meeting to discuss
Woodruff Congestion relief for those affected municipalities. Mr. Madden and I were scheduled
elsewhere and suggested a rescheduled date. They went ahead with the meeting. Mr. Madden called
several times for an update and their response was “those affected went ahead and met and made
the necessary decisions to move forward.”
3
Based on tonight’s committee members needing more time to revise the website and options, plus
SCDOT has another public information meeting scheduled for tomorrow night, April 5th at Beck
International Academy, 901 Woodruff Road from 5:00 p.m.- 7:00 p.m. with the drawings and staff to
discuss, I would suggest this committee consider holding this item and avail yourself of the
educational opportunities available in order to make the best decision for the Mauldin citizens. Thank
you.
3. Reading and Approval of Minutes
a. Public Works Committee Meeting: March 7, 2022
Motion: Councilman Reynolds made a motion to approve the minutes with Councilwoman King
seconding.
Vote: The vote was unanimous (3-0).
4. Reports or Communications from City Officers
a. Public Works Director Matt Fleahman- Budget Review
Mr. Fleahman reported all divisions are doing well with their budgets.
Councilman Reynolds asked if we are still waiting on equipment. Mr. Fleahman answered we are
waiting on a Ram 3500, a sewer jetter, and two side-arm trash trucks. There is no ETA on the trash
trucks. The sewer jetter’s chassis is complete, but the equipment needs to be assembled.
5. Unfinished Business- There is no unfinished business.
6. New Business
a. Memorandum of Understanding - Woodruff Road Congestion Relief Project
This is a Memorandum of Understanding (MOU) between Greenville County, City of Greenville, and
Mauldin for the purpose of establishing a focused planning effort for the area surrounding and
concerning the future Woodruff Road Congestion Relief Project’s parallel road. Construction is slated
for 2026. The City would commit to informing the public of the project and adopt an area plan.
Councilman Reynolds said it concerns him that the meeting was held without us and what is being
proposed. Councilwoman King agreed. Chairman Kraeling said if we don’t participate, this project
will not stop.
This item was held in committee.
Mr. Dyrhaug advised committee the City of Greenville and Greenville County will be reviewing this
MOU in a workshop setting, so holding this item is not a problem. If we do not participate, it does
not affect the project. SCDOT will take comments on this project during the month of April. Mauldin
staff has asked that there be a specific meeting held for residents of Pine Forest and Oak Forest.
Councilwoman King asked if passing this MOU gives Mr. Dyrhaug and Mr. Madden more input into
the project. Mr. Dyrhaug said no, it would not open any additional doors. Mr. Dyrhaug said he does
discuss this with Greenville City and Greenville County staff. This will continue to happen regardless
of the MOU.
4
7. Public Comment
Terry Merritt: The Fix Woodruff Road congestion relief is moving forward. The MOU is being
presented for a project for 2026. East Butler Road is slated for 2024. Where is the MOU for this
project? We are supposed to be ahead of them. The money is there, so funding is not an issue.
Woodruff Road is a priority 1. You read whatever tea leaves you want to, there is no stopping the
juggernaut. I find it interesting that we are supposed to hold to new standards. When you review
the drawings, notice the new congestion in the relief corridor, notice the new apartments being built.
I am not smart enough to understand how you address congestion, but you put new homes on the
dirt right next to the congestion. I wonder if Pine Forest and Oak Forest know about this. We can’t
stop it, but I hope we can get East Butler Road done before there is another congestion relief project.
8. Committee Concerns
Councilman Reynolds said the fields looked fantastic on Opening Day. This is a comment for Public
Works and Recreation.
9. Adjournment- Chairman Kraeling adjourned the meeting at 6:55 p.m.
Respectfully Submitted,
Cindy Miller
Municipal Clerk
5
PUBLIC WORKS COMMITTEE
AGENDA ITEM
M
EETING DATE: June 6, 2022
AG
ENDA ITEM: 6a
TO
: Public Works Committee
FROM: Public Works Director, Matthew Fleahman
SUBJECT: Stormwater Engineering Task Order 01
REQUEST
Authorization is requested to approve Task Order 01 with KCI to provide stormwater project design
services.
HISTORY/BACKGROUND
The City of Mauldin is part of Greenville County’s MS4 Stormwater permit. As part of the permit, the City
is responsible for drainage structures within City -Owned rights-of-way (ROWs). The Pubic Works
Department inspects and maintains these drainage systems so that stormwater will be properly conveyed to
drainage outfalls. In many portions of the City, stormwater drainage structures were constructed off the
ROW and on private property. These conveyances sometimes traverse several properties before emerging
back on City owned property. In accordance with State Law and City Policies, the City is not responsible
for these drainage structures on private property. In instances where drainage systems on private property
have been addressed by the City, the property owner and the City establish utility easements which grant
access and authority over the inspection and maintenance of the newly installed/repaired drainage structure.
T
he City identified a need to contract KCI to inspect, design, and oversee stormwater construction projects
in areas of the City where the installed drainage system is under sized, failing, or absent. This need extends
to both the City-owned ROW and private property. In Council Memorandum 9-1 dated September 8, 2021,
Council was provided a recommended Spending Plan for the American Rescue Plan Act (ARPA). In it,
the City recommended allocating resources to address stormwater issues throughout the City.
On
December 6, 2021 the City issued a Request for Proposal for On-Call Engineering Services. After thirty
days, the submittal window was closed and a review team of three City employees was convened to review
and score the submittals. KCI was awarded the hi ghest score and was contacted to generate an On -Call
services contract. City Council approved the contract with KCI during its March 2022 Council meeting.
6
ANALYSIS or STAFF FINDINGS
Representatives from Public Works and City Administration met with KCI and identified areas of known
concern throughout the City. The area of concerns included Knollwood and Edgewood Drive, the Holly
Springs neighborhood, the Bishop Heights neighborhood, the Harrison’s Plaza, Bi-lo Distribution Center,
and portions of Oak Park Drive. KCI developed the attached Task Order 01 to identify the scope of services
to be provided and to outline project schedules with associated costs. Task Order 01 does not include any
construction costs, as the entirety of the task order is engineering services.
FINCANCIAL IMPACT
The City allocated 1,129,724 dollars in year one of the ARPA spending to fund necessary stormwater
management projects that improve the City’s stormwater infrastructure systems. The engineering services
associated with this task order are proposed at 226,600.
RECOMMENDATION
Staff recommends the Public Works Committee and the City Council approve the Task Order 01 with
KCI.
7
TASK ORDER 01
to the
MSA for Professional Services
KCI Project Number
This Task Order effective as of the date of the last signature (“Effective Date”) is entered
into by City of Mauldin (“Client”) and KCI Technologies, Inc. (“KCI”) with regard to the
project identified below (“Project”). Client and KCI shall collectively be referred to herein as
the “Parties.”
The Project: I nitial City Wide Stormwater Flooding Assessment, Stormwater Asset
Inventory, and Currently Identified Areas of Concern
Project Address: City Wide
Client’s
Representative:
Public Works Director: Matthew D. Fleahman
KCI’s
Representative:
Client Liaison: Elise Harris
Project Manager: Mack Kelly
All services provided by the Parties on the Project shall be governed by the terms of this
Task Order and those in the Master Services Agreement for Professional Services (“MSA”)
attached hereto as Attachment A and incorporated by reference herein.
The Parties shall complete this Task Order in accordance with the contract documents listed
on and attached as Attachment B (the “Contract Documents”).
Scope of Services
KCI’s scope of services, including deliverables (the “Services”), is Task 1a is an initial City
Wide Stormwater Assessment (identifying flooding and erosion issues). Task 1b is to provide
conceptual recommendation for 6 currently identified areas of concern.
Task 1a Stormwater Flooding and Erosion Assessment
KCI will issue Request for Information to the Client to obtain available information
pertaining to areas of frequent flooding and/or erosion, areas of flood and/or erosion that impact
emergency responses; and erosion and stability issues. KCI will assist the Client facilitate local
meetings (up to four (4), two (2) hour meetings to assist the Client collect neighborhood issues
regarding flooding and/or erosion concerns.
Deliverable: Report summarizing the information obtained from the Request for
Information from the Client and local meetings. An annotated map(s). will be provided as a
graphic to illustrate flooding and erosion areas of concern and also depict impacts to emergency
response, approximate number of residents impacted.
8
Task 1b Evaluations of Known Areas of Concern
Each area of concern is addressed below:
1. Bishop Heights - This development gets the most complaints and would most likely be
at the top of the city’s list for priority. The project area consists of the following streets:
Bishop Drive, Lake Street, Garrett Street and Rita Street, which are in the southwest
portion of the City near Ashmore Bridge Road (State Road 448). (See Exhibit A, Site 1).
Our understanding of the specific issue to be studied are as follows: The development
consists of catch basins and ditches, but most of the ditches have been filled in.
Homeowners have created diversion ditches in their back yards that were not permitted
by the Client. The issue is at Lot 435 where stormwater is directly conveyed from a pond
on the west side of the development at their property. The goal would be to convey
stormwater more effectively.
Primary elements of the project study include:
• Participation in Client/KCI Kickoff Meeting (site visit)
• Watershed/Subwatershed Delineation
• Conduct Field Observations to develop Map of Existing Conditions
• Prepare an Existing Conditions Map (Conceptual – no surveying)
• Evaluation of Existing Conditions
• Prepare Conceptual Designs (up to 3 alternatives)
• Prepare 15% Plans / Preliminary Design
• Develop an Opinion of Probable Construction Cost
• Participation in Client/KCI Conceptual Alternatives Review meeting for
d
iscussion of alternatives.
• Submit brief report summarizing existing conditions, issues and
c
hallenges. Each alternative design will provide a basis for design of
alternatives, the preliminary design plan and an opinion of probable
construction cost. A recommendation on the selected alternative will also
be provided.
2. Harrison Plaza – The project area consists of the following streets: Carlton Drive
,
P
inehurst Drive and Lanier Lane, which are in the southern portion of the City near the
New Neely Ferry Road (State Road 144). (See Exhibit A, Site 2).
O
ur understanding of the specific issue to be studied are as follows: The site has a large
impervious area and does not have any stormwater controls since it was constructed most
likely in the 60’s. Stormwater is draining to the development along Carlton Drive and
Pinehurst Drive. These roads flood and the flooding overtops the roads. The pond
between the plaza and the homes is privately owned, and the City is not interested in
taking it over or modifying it. There is a large swale that has been constructed between
lots 201 and 205 along Pinehurst Drive that we would need to look at since it is conveying
stormwater from Ranch Creek. A feasibility study would be done to look at the best
options for conveying stormwater.
Primary Elements of the project study include:
• Participation in Client/KCI Kickoff Meeting (site visit)
9
• W atershed/Subwatershed Delineation
• Conduct Field Observations to develop Map of Existing Conditions
• Prepare an Existing Conditions Map (Conceptual – no surveying)
• Evaluation of Existing Conditions
• Prepare Conceptual Designs (up to 3 alternatives)
• Prepare 15% Plans / Preliminary Design
• Develop an Opinion of Probable Construction Cost
• Participation in Client/KCI Conceptual Alternatives Review meeting for
d
iscussion of alternatives.
• Submit brief report summarizing existing conditions, issues and
c
hallenges. Each alternative design will provide a basis for design of
alternatives, the preliminary design plan and an opinion of probable
construction cost. A recommendation on the selected alternative will also
be provided.
3. Knollwood Drive – The project area consists of the following streets: Knollwood Drive,
Edgewood Drive and Devon Drive, which are in the western portion of the City near
North Main Street (US-276). (See Exhibit A, Site 3)
.
O
ur understanding of the specific issue to be studied are as follows: Stormwater flows
down Edgewood Drive and is directed to lot 417 along Knollwood Drive. The homeowner
has made several complaints of flooding and looks to have dug swales along the western
side of his property to help relieve the flooding. Edgewood Drive was recently paved, so
although curb & gutter would be a likely option. It may be better to look at some greener
alternatives (such as bioswales) that would not require tearing up the newly paved road.
The right-of-way along the roads is roughly 15’-30’ from centerline. A feasibility study
would be done to look at different options.
Primary Elements of the project study include:
• Participation in Client/KCI Kickoff Meeting (site visit)
• Watershed/Subwatershed Delineation
• Conduct Field Observations to develop Map of Existing Conditions
• Prepare an Existing Conditions Map (Conceptual – no surveying)
• Evaluation of Existing Conditions
• Prepare Conceptual Designs (up to 3 alternatives)
• Prepare 15% Plans / Preliminary Design
• Develop an Opinion of Probable Construction Cost
• Participation in Client/KCI Conceptual Alternatives Review meeting for
d
iscussion of alternatives.
• Submit brief report summarizing existing conditions, issues and
c
hallenges. Each alternative design will provide a basis for design of
alternatives, the preliminary design plan and an opinion of probable
construction cost. A recommendation on the selected alternative will also
be provided.
4. Bi-Lo Distribution Center - The project area consists of the following streets: Swinton
Street, Middleton Lane, Woodridge Circle and Bi Lo Boulevard, which are in the northern
portion of the City near the Miller Road (Highway 564). (See Exhibit A, Site 4)
.
10
O
ur understanding of the specific issue to be studied are as follows: Stormwater from the
large industrial/commercial sites to the west is being conveyed to the development along
Middleton Lane, Swinton Drive and Woodridge Circle that is causing flooding issues in
several areas. It appears that the Bi Lo Distribution Center has constructed several swales
along Bi-Lo Boulevard in an effort to mitigate the flooding. There is a brick swale that
was built by Bi-Lo between lots 107 & 109 along Swinton Drive. There is also a pipe that
runs very close to the back of a house on Lot 100 on Swinton Drive and then turns and
runs between lots 115 & 114, and 113 & 111 to a catch basin along Woodridge Circle.
The pipe on lot 100 is failing and the homeowner has dug a ditch to keep stormwater from
flowing on to the property. The remainder of the failing pipe is causing sink holes the size
of cars on lots 115 & 114. There is also a large swale between lots 121 & 119 along
Woodridge Circle that ultimately drains to Gilder Creek. The current piping is undersized
for the amount of stormwater that is coming from the industrial/commercial site. This
project would most likely be the most complex.
Primary Elements of the project study include:
• Participation in Client/KCI Kickoff Meeting (site visit)
• Watershed/Subwatershed Delineation
• Conduct Field Observations to develop Map of Existing Conditions
• Prepare an Existing Conditions Map (Conceptual – no surveying)
• Evaluation of Existing Conditions
• Prepare Conceptual Designs (up to 3 alternatives)
• Prepare 15% Plans / Preliminary Design
• Develop an Opinion of Probable Construction Cost
• Participation in Client/KCI Conceptual Alternatives Review meeting for
d
iscussion of alternatives.
• Submit brief report summarizing existing conditions, issues and
c
hallenges. Each alternative design will provide a basis for design of
alternatives, the preliminary design plan and an opinion of probable
construction cost. A recommendation on the selected alternative will also
be provided.
5. Oak Park Drive - The project area consists of the following streets: Oak Park Drive,
Barrett Drive and Elkwood Street, which relatively in the center of the City near the East
Butler Road (State Road 107) thorough fare. (See Exhibit A, Site 5)
.
O
ur understanding of the specific issue to be studied are as follows: The stormwater
currently runs between lots 126 & 128 along Oak Park Drive and then is directed behind
the house of lot 133, across Elkwood Street and through lot 100 & 228 before it reaches
a catch basin along Barrett Drive. This path does not match what is shown in GIS. The
pipe running through lot 133 is dangerously close to the foundation. The homeowner for
Lot 100 has a dug swale along the property to direct stormwater (assuming this was done
to direct it away from the house). There is also a large culvert under Barrett Drive between
lots 216 & 220 that goes under the road and between lots 215 & 217 that ultimately drains
into Gilder Creek. An easement would be needed to do stream restoration in this area.
The City would like to get some options and have stated that a buyout would be
considered.
11
P
rimary Elements of the project study include:
• Participation in Client/KCI Kickoff Meeting (site visit)
• Watershed/Subwatershed Delineation
• Conduct Field Observations to develop Map of Existing Conditions
• Prepare an Existing Conditions Map (Conceptual – no surveying)
• Evaluation of Existing Conditions
• Prepare Conceptual Designs (up to 3 alternatives)
• Prepare 15% Plans / Preliminary Design
• Develop an Opinion of Probable Construction Cost
• Participation in Client/KCI Conceptual Alternatives Review meeting for
d
iscussion of alternatives.
• Submit brief report summarizing existing conditions, issues and
c
hallenges. Each alternative design will provide a basis for design of
alternatives, the preliminary design plan and an opinion of probable
construction cost. A recommendation on the selected alternative will also
be provided.
6. Holly Springs - This development was built in the 1960’s or 1970’s and has failing
corrugated metal metal storm drain piping and crumbling catch basins. The project
area consists of the following streets: Brookbend Road, Springvale Drive
,
B
eechwood Court, Blackgum Court, Brookend Court, Poplar Lane and Old Bridges
Road, which are in the northeast portion of the City near the Bridges Road and East
Butler Road (State Road 107). (See Exhibit A, Site 6)
.
O
ur understanding of the specific issue to be studied are as follows: In several
places, rather than having a 90 degree bend, the piping cuts through the corner of
several lots. The ditch was re-done between lots 132-136. The owner of Lot 126
purchased the vacant lot adjoining the property and provided the City with a
drainage easement. The City thinks that redoing the storm drain in the entire
neighborhood maybe required. Stormwater from this development goes to Gilder
Creek.
Primary Elements of the project study include:
• Participation in Client/KCI Kickoff Meeting (site visit)
• Watershed/Subwatershed Delineation
• Conduct Field Observations to develop Map of Existing Conditions
• Prepare an Existing Conditions Map (Conceptual – no surveying)
• Evaluation of Existing Conditions
• Prepare Conceptual Designs (up to 3 alternatives)
• Prepare 15% Plans / Preliminary Design
• Develop an Opinion of Probable Construction Cost
• Participation in Client/KCI Conceptual Alternatives Review meeting for
d
iscussion of alternatives.
• Submit brief report summarizing existing conditions, issues and
c
hallenges. Each alternative design will provide a basis for design of
alternatives, the preliminary design plan and an opinion of probable
12
construction cost. A recommendation on the selected alternative will also
be provided.
Project Schedule
KCI shall perform the Services in accordance with the schedule (“Project Schedule”)
provided below.
Task 1a is 3 months
Task 1b is 12 months (some can be performed at the same time)
1. Bishop Heights is 3 months
2. Harrison Plaza is 3 months
3. Knollwood Drive is 2 months
4. Bi-Lo Distribution Center is 3 months
5. Oak Park Drive 3 is months
6. Holly Springs is 3 months
Fee and Payment
KCI’s fee for completion of the Services in accordance with the Contract Documents is
Task 1a is $27,000,
Task 1b is $199,600
1. Bishop Heights $27,500
2. Harrison Plaza $38,800
3. Knollwood Drive $20,100
4. Bi-Lo Distribution Center $45,700
5. Oak Park Drive $40,100
6. Holly Springs $27,400
Total for Task 1 is $226,600.
KCI shall comply with the invoicing procedures described in the MSA.
13
Special Terms and Conditions
In the event of a conflict between the following terms and conditions and the MSA with
regard to the Services, the terms and conditions listed in this Special Terms and Conditions
Section shall govern.
(Any terms and conditions that vary from the MSA to be inserted.)
In the event of any other conflict between the terms hereof and the MSA, the terms of
the MSA shall govern.
IN WITNESS WHEREOF, the Parties have caused this Task Order to be duly executed. Each
Party warrants and represents that its respective signatories whose signatures appear below have
been and are on the date of signature duly authorized to execute this Task Order.
City of Mauldin
BY
:
Signature
Name
Title
Date
KCI Technologies, Inc.
BY
:
Signature
Name
Title
Date
C. Wesley Hulsey
VP, Regional Practice Leader
May 2, 2022
14
A
ttachment A to Task Order
MSA
15
16
17
18
19
20
21
22
23
24
25
26
27
David J. DePratter
SC W/WW Practice Leader
04/05/2022
28
29
30
31
32
33
34
A
ttachment B to Task Order
Contract Documents
(Include all relevant documents, attachments, and exhibits.)
35
E
xhibit A
36
4
1
6
5
2
3
Laurel Creek
Gilder Creek
Bridge Fork Creek
Reedy River
Rocky Creek
Reedy River
Rocky Creek
Imagery Managed by Adam DeMars, South Carolina State GIS Coordinator
Imagery Collected byKucera International
Hosted Tile service provided by ESRI
City Limits (GIS) ~5 sq mi
Streams
FEMA Zone AE
FEMA Floodway
²
0 1,750875
Feet
SCDNR Aerial Imagery 2020.
37
PUBLIC WORKS COMMITTEE
AGENDA ITEM SUMMARY
M
EETING DATE: June 6, 2022
AGENDA ITEM: 6b
T
O: Public Works Committee
FROM: City Administrator Brandon Madden
SUBJECT: Acceptance of Loblolly Circle Extension (Road Number F-PD-72)
REQUEST
Direction on the acceptance of Loblolly Circle Extension (Road Number F-PD-72) into the City’s road
inventory.
HISTORY/BACKGROUND
Stanley Martin Homes is working to being construction of the Parkland Phase 2 residential develop off of
Loblolly Circle Extension (Road Number F-PD-72). Loblolly Circle Extension is currently a private drive and
Stanley Martin has requested that the road to become a public road after the proposed improvements
are completed.
T
he road is located in unincorporated Greenville County . Greenville County has informed the City that
they do not have any interest in owning the road because it is not accessible via any other county roads.
Direction is being requested on the City’s position on accepting the road into the City’s inventory.
ANALYSIS or STAFF FINDINGS
Greenville County currently maintains Loblolly Circle from Ridge to the Greenville City/Mauldin City
Limits (approximately 315 ft). From this point to the 90 degree bend is jointly maintained, the left side
of the road is Greenville City and the right side is Mauldin.
Th
e Parkland development is in the City limits and has 3 Phases. Phase 1, which is under construction,
includes 147 townhomes. Phase 2 will have 93 townhomes and Phase 3 will have 97 townhomes.
Phases 2 and 3 will be accessed via Loblolly Circle Extension. Phase 1 has multiple entrances off of
Loblolly Circle which is before Loblolly Circle Extension.
If
taken over by the City, Loblolly Circle Ext. will have to meet the City’s road standards and will include a
small portion of the county maintained Loblolly Circle so the City’s road ownership would be continuous.
FISCAL IMPACT
Minimal.
RECOMMENDATION
Council direction is being requested.
ATTACHMENTS
Aerial Map of Loblolly Circle Ext.
38
39
PUBLIC WORKS COMMITTEE
AGENDA ITEM
MEETI
NG DATE: June 6, 2022
AGE
NDA ITEM: 6c
TO:
Public Works Committee
FROM: Public Works Director, Matthew Fleahman
SUBJECT: Mosquito Spraying
REQUEST
Authorization is requested to eliminate the city-wide mosquito fogging program.
HISTORY/BACKGROUND
The City of Mauldin Public Works has actively participated in a city -wide mosquito fogging program for
many years. The fogging program’s aim is to eliminate adult mosquitos and larva as a means of vector
control. Public Works utilizes a synthetic chemical called Permethrin as the insecticide. Public Works
staff work after hours over night on weekends during the months of May through October to fog the entire
City.
Th
e synthetic chemical Permethrin is classified by the United States Environmental Protection Agency as
a likely human carcinogen. Excessive exposure to Permethrin can cause nausea, headache, muscle
weakness, shortness of breath, and seizures. The spraying of the chemical is regulated, and workers must
be licensed as a commercial pesticide applicator to use the product.
ANALYSIS or STAFF FINDINGS
Public Works has logged a significant number of complaints about the program and has been asked to stop
this activity. The fogging of Permethrin not only kills mosquitos, but many other insects including bees.
Studies have shown that the chemical is also harmful to aquatic life. Residents have also expressed concerns
about the exposure of their pets (cats and dogs) to the chemical. Public Works cannot identify the efficiency
of the program; however, studies have shown that fogging will kill only part of the mosquitos in the area
for a few days.
FINCANCIAL IMPACT
The City allocates 5,000 annually to the mosquito control program within the Parks and Grounds budget.
RECOMMENDATION
Staff does not make any recommendations at this time, this issue is being brought before Committee in
response to a number of requests from City residents.
40