RecordWell Data

Public Works Committee Meeting june 2022 FINAL

City of Mauldin · Greenville County · meeting of Jun 3, 2022 · Notices

Open the original document More from City of Mauldin

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PUBLIC WORKS COMMITTEE MEETING MONDAY, JUNE 6, 2022 | 6 PM 3rd committee meeting The Committee will meet in Mauldin City Hall at 5 East Butler Road in the Council Chambers at 6 p.m. The meeting will be available remotely through Zoom. Please visit the City’s website at https://cityofmauldin.org/your-government/meeting-minutes-agendas/ to access the meeting via audio and videoconferencing. A quorum of Council will be present. 1 PUBLIC WORKS COMMITTEE MEETING JUNE 6, 2022, 6PM CITY HALL - COUNCIL CHAMBERS 5 E. BUTLER ROAD Committee Members: Jason Kraeling (Chair), Carol King, Michael Reynolds 1. Call to Order 2. Public Comment 3. Reading and Approval of Minutes a.Public Works Committee Meeting: April 4, 2022 [Pages 3-5] 4. Reports or Communications from City Officers a. Public Works Director Matt Fleahman Budget Review 5. Unfi nished Business There is no unfinished business. 6. New B usiness a.Stormwater Task Order [Pages 6-37] b.Acceptance of Loblolly Circle [Pages 38-39] c.Mosquito Spraying Program [Page 40] 7. Publ ic Comment 8. Committee Concerns 9. Adjournment The Honorable Jason Kraeling The Honor able Jason Kraeling The Honor able Jason Kraeling The H onorable Jason Kraeling The H onorable Jason Kraeling The H onorable Jason Kraeling The Honorable Jason Kraeling The Honorable Jason Kraeling 2 MINUTES PUBLIC WORKS COMMITTEE MEETING APRIL 4, 2022, 6PM CITY HALL - COUNCIL CHAMBERS 5 E. BUTLER ROAD 3rd committee meeting C ommittee Members: Jason Kraeling (Chair), Carol King, Michael Reynolds Others present: PW Director Matt Fleahman and City Administrator Brandon Madden 1. C all to Order- Chairman Kraeling 2. Public Comment M ayor Merritt: I reside at 214 Fairfield Drive. As Mayor, I sit on the GPATS policy committee of approximately 31 members. In my year or so, I have seen our East Butler Road project delayed many times. I also see the Fix Woodruff Road congestion relief project get assigned priority 1 and continue to move forward. I wanted to provide you with some data that hopefully you were able to glean in the limited time you have had this agenda packet. L et’s focus on those tangible areas that will affect the citizens of Mauldin. 1. M iller Road is proposed to be closed and abandoned from appropriately 1221 Miller Road and South Oak Forest Drive, westward past Frankie’s Fun Park and then to an expanded intersection just prior to the railroad tracks on to Woodruff Road as well as right onto Park Woodruff Road. T his will have entrance to Frankie’s Fun Park, At Home, Hamrick’s and on to IHOP. There are no red lights planned at Woodruff Road. 2. A new traffic circle is planned to take traffic toward former South Oak Forest Drive into Oak Forest a nd Pine forest. If you look online at the revised proposal, you will notice the Woodruff Road congestion relief bringing potentially more thru traffic to the entranceways to Pine Forest and Oak Forest. D oes that fit our residents in these tranquil neighborhoods? 3. A ll eastbound Miller Road traffic coming from Mauldin, Five Forks, Corn Road, and Miller would be forced to negotiate 2 traffic circles in order to get to current Miller Road/Woodruff Road intersection. T here will be 2 new bridges built, one over I85 and the 2nd over I385. There will be five in total new roundabouts with the same connections to Woodruff Road. Where does the congestion go? Towards Mauldin on Miller, past the Oak Forest and Pine Forest entranceways and I have not mentioned Smith Hines Road. S everal months ago, GPATS staff, the City of Greenville Mayor and City Administrator, as well as then current Chair of County Council, requested me and Mr. Madden join them for a meeting to discuss Woodruff Congestion relief for those affected municipalities. Mr. Madden and I were scheduled elsewhere and suggested a rescheduled date. They went ahead with the meeting. Mr. Madden called several times for an update and their response was “those affected went ahead and met and made the necessary decisions to move forward.” 3 Based on tonight’s committee members needing more time to revise the website and options, plus SCDOT has another public information meeting scheduled for tomorrow night, April 5th at Beck International Academy, 901 Woodruff Road from 5:00 p.m.- 7:00 p.m. with the drawings and staff to discuss, I would suggest this committee consider holding this item and avail yourself of the educational opportunities available in order to make the best decision for the Mauldin citizens. Thank you. 3. Reading and Approval of Minutes a. Public Works Committee Meeting: March 7, 2022 Motion: Councilman Reynolds made a motion to approve the minutes with Councilwoman King seconding. Vote: The vote was unanimous (3-0). 4. Reports or Communications from City Officers a. Public Works Director Matt Fleahman- Budget Review Mr. Fleahman reported all divisions are doing well with their budgets. Councilman Reynolds asked if we are still waiting on equipment. Mr. Fleahman answered we are waiting on a Ram 3500, a sewer jetter, and two side-arm trash trucks. There is no ETA on the trash trucks. The sewer jetter’s chassis is complete, but the equipment needs to be assembled. 5. Unfinished Business- There is no unfinished business. 6. New Business a. Memorandum of Understanding - Woodruff Road Congestion Relief Project This is a Memorandum of Understanding (MOU) between Greenville County, City of Greenville, and Mauldin for the purpose of establishing a focused planning effort for the area surrounding and concerning the future Woodruff Road Congestion Relief Project’s parallel road. Construction is slated for 2026. The City would commit to informing the public of the project and adopt an area plan. Councilman Reynolds said it concerns him that the meeting was held without us and what is being proposed. Councilwoman King agreed. Chairman Kraeling said if we don’t participate, this project will not stop. This item was held in committee. Mr. Dyrhaug advised committee the City of Greenville and Greenville County will be reviewing this MOU in a workshop setting, so holding this item is not a problem. If we do not participate, it does not affect the project. SCDOT will take comments on this project during the month of April. Mauldin staff has asked that there be a specific meeting held for residents of Pine Forest and Oak Forest. Councilwoman King asked if passing this MOU gives Mr. Dyrhaug and Mr. Madden more input into the project. Mr. Dyrhaug said no, it would not open any additional doors. Mr. Dyrhaug said he does discuss this with Greenville City and Greenville County staff. This will continue to happen regardless of the MOU. 4 7. Public Comment Terry Merritt: The Fix Woodruff Road congestion relief is moving forward. The MOU is being presented for a project for 2026. East Butler Road is slated for 2024. Where is the MOU for this project? We are supposed to be ahead of them. The money is there, so funding is not an issue. Woodruff Road is a priority 1. You read whatever tea leaves you want to, there is no stopping the juggernaut. I find it interesting that we are supposed to hold to new standards. When you review the drawings, notice the new congestion in the relief corridor, notice the new apartments being built. I am not smart enough to understand how you address congestion, but you put new homes on the dirt right next to the congestion. I wonder if Pine Forest and Oak Forest know about this. We can’t stop it, but I hope we can get East Butler Road done before there is another congestion relief project. 8. Committee Concerns Councilman Reynolds said the fields looked fantastic on Opening Day. This is a comment for Public Works and Recreation. 9. Adjournment- Chairman Kraeling adjourned the meeting at 6:55 p.m. Respectfully Submitted, Cindy Miller Municipal Clerk 5 PUBLIC WORKS COMMITTEE AGENDA ITEM M EETING DATE: June 6, 2022 AG ENDA ITEM: 6a TO : Public Works Committee FROM: Public Works Director, Matthew Fleahman SUBJECT: Stormwater Engineering Task Order 01 REQUEST Authorization is requested to approve Task Order 01 with KCI to provide stormwater project design services. HISTORY/BACKGROUND The City of Mauldin is part of Greenville County’s MS4 Stormwater permit. As part of the permit, the City is responsible for drainage structures within City -Owned rights-of-way (ROWs). The Pubic Works Department inspects and maintains these drainage systems so that stormwater will be properly conveyed to drainage outfalls. In many portions of the City, stormwater drainage structures were constructed off the ROW and on private property. These conveyances sometimes traverse several properties before emerging back on City owned property. In accordance with State Law and City Policies, the City is not responsible for these drainage structures on private property. In instances where drainage systems on private property have been addressed by the City, the property owner and the City establish utility easements which grant access and authority over the inspection and maintenance of the newly installed/repaired drainage structure. T he City identified a need to contract KCI to inspect, design, and oversee stormwater construction projects in areas of the City where the installed drainage system is under sized, failing, or absent. This need extends to both the City-owned ROW and private property. In Council Memorandum 9-1 dated September 8, 2021, Council was provided a recommended Spending Plan for the American Rescue Plan Act (ARPA). In it, the City recommended allocating resources to address stormwater issues throughout the City. On December 6, 2021 the City issued a Request for Proposal for On-Call Engineering Services. After thirty days, the submittal window was closed and a review team of three City employees was convened to review and score the submittals. KCI was awarded the hi ghest score and was contacted to generate an On -Call services contract. City Council approved the contract with KCI during its March 2022 Council meeting. 6 ANALYSIS or STAFF FINDINGS Representatives from Public Works and City Administration met with KCI and identified areas of known concern throughout the City. The area of concerns included Knollwood and Edgewood Drive, the Holly Springs neighborhood, the Bishop Heights neighborhood, the Harrison’s Plaza, Bi-lo Distribution Center, and portions of Oak Park Drive. KCI developed the attached Task Order 01 to identify the scope of services to be provided and to outline project schedules with associated costs. Task Order 01 does not include any construction costs, as the entirety of the task order is engineering services. FINCANCIAL IMPACT The City allocated 1,129,724 dollars in year one of the ARPA spending to fund necessary stormwater management projects that improve the City’s stormwater infrastructure systems. The engineering services associated with this task order are proposed at 226,600. RECOMMENDATION Staff recommends the Public Works Committee and the City Council approve the Task Order 01 with KCI. 7 TASK ORDER 01 to the MSA for Professional Services KCI Project Number This Task Order effective as of the date of the last signature (“Effective Date”) is entered into by City of Mauldin (“Client”) and KCI Technologies, Inc. (“KCI”) with regard to the project identified below (“Project”). Client and KCI shall collectively be referred to herein as the “Parties.” The Project: I nitial City Wide Stormwater Flooding Assessment, Stormwater Asset Inventory, and Currently Identified Areas of Concern Project Address: City Wide Client’s Representative: Public Works Director: Matthew D. Fleahman KCI’s Representative: Client Liaison: Elise Harris Project Manager: Mack Kelly All services provided by the Parties on the Project shall be governed by the terms of this Task Order and those in the Master Services Agreement for Professional Services (“MSA”) attached hereto as Attachment A and incorporated by reference herein. The Parties shall complete this Task Order in accordance with the contract documents listed on and attached as Attachment B (the “Contract Documents”). Scope of Services KCI’s scope of services, including deliverables (the “Services”), is Task 1a is an initial City Wide Stormwater Assessment (identifying flooding and erosion issues). Task 1b is to provide conceptual recommendation for 6 currently identified areas of concern. Task 1a Stormwater Flooding and Erosion Assessment KCI will issue Request for Information to the Client to obtain available information pertaining to areas of frequent flooding and/or erosion, areas of flood and/or erosion that impact emergency responses; and erosion and stability issues. KCI will assist the Client facilitate local meetings (up to four (4), two (2) hour meetings to assist the Client collect neighborhood issues regarding flooding and/or erosion concerns. Deliverable: Report summarizing the information obtained from the Request for Information from the Client and local meetings. An annotated map(s). will be provided as a graphic to illustrate flooding and erosion areas of concern and also depict impacts to emergency response, approximate number of residents impacted. 8 Task 1b Evaluations of Known Areas of Concern Each area of concern is addressed below: 1. Bishop Heights - This development gets the most complaints and would most likely be at the top of the city’s list for priority. The project area consists of the following streets: Bishop Drive, Lake Street, Garrett Street and Rita Street, which are in the southwest portion of the City near Ashmore Bridge Road (State Road 448). (See Exhibit A, Site 1). Our understanding of the specific issue to be studied are as follows: The development consists of catch basins and ditches, but most of the ditches have been filled in. Homeowners have created diversion ditches in their back yards that were not permitted by the Client. The issue is at Lot 435 where stormwater is directly conveyed from a pond on the west side of the development at their property. The goal would be to convey stormwater more effectively. Primary elements of the project study include: • Participation in Client/KCI Kickoff Meeting (site visit) • Watershed/Subwatershed Delineation • Conduct Field Observations to develop Map of Existing Conditions • Prepare an Existing Conditions Map (Conceptual – no surveying) • Evaluation of Existing Conditions • Prepare Conceptual Designs (up to 3 alternatives) • Prepare 15% Plans / Preliminary Design • Develop an Opinion of Probable Construction Cost • Participation in Client/KCI Conceptual Alternatives Review meeting for d iscussion of alternatives. • Submit brief report summarizing existing conditions, issues and c hallenges. Each alternative design will provide a basis for design of alternatives, the preliminary design plan and an opinion of probable construction cost. A recommendation on the selected alternative will also be provided. 2. Harrison Plaza – The project area consists of the following streets: Carlton Drive , P inehurst Drive and Lanier Lane, which are in the southern portion of the City near the New Neely Ferry Road (State Road 144). (See Exhibit A, Site 2). O ur understanding of the specific issue to be studied are as follows: The site has a large impervious area and does not have any stormwater controls since it was constructed most likely in the 60’s. Stormwater is draining to the development along Carlton Drive and Pinehurst Drive. These roads flood and the flooding overtops the roads. The pond between the plaza and the homes is privately owned, and the City is not interested in taking it over or modifying it. There is a large swale that has been constructed between lots 201 and 205 along Pinehurst Drive that we would need to look at since it is conveying stormwater from Ranch Creek. A feasibility study would be done to look at the best options for conveying stormwater. Primary Elements of the project study include: • Participation in Client/KCI Kickoff Meeting (site visit) 9 • W atershed/Subwatershed Delineation • Conduct Field Observations to develop Map of Existing Conditions • Prepare an Existing Conditions Map (Conceptual – no surveying) • Evaluation of Existing Conditions • Prepare Conceptual Designs (up to 3 alternatives) • Prepare 15% Plans / Preliminary Design • Develop an Opinion of Probable Construction Cost • Participation in Client/KCI Conceptual Alternatives Review meeting for d iscussion of alternatives. • Submit brief report summarizing existing conditions, issues and c hallenges. Each alternative design will provide a basis for design of alternatives, the preliminary design plan and an opinion of probable construction cost. A recommendation on the selected alternative will also be provided. 3. Knollwood Drive – The project area consists of the following streets: Knollwood Drive, Edgewood Drive and Devon Drive, which are in the western portion of the City near North Main Street (US-276). (See Exhibit A, Site 3) . O ur understanding of the specific issue to be studied are as follows: Stormwater flows down Edgewood Drive and is directed to lot 417 along Knollwood Drive. The homeowner has made several complaints of flooding and looks to have dug swales along the western side of his property to help relieve the flooding. Edgewood Drive was recently paved, so although curb & gutter would be a likely option. It may be better to look at some greener alternatives (such as bioswales) that would not require tearing up the newly paved road. The right-of-way along the roads is roughly 15’-30’ from centerline. A feasibility study would be done to look at different options. Primary Elements of the project study include: • Participation in Client/KCI Kickoff Meeting (site visit) • Watershed/Subwatershed Delineation • Conduct Field Observations to develop Map of Existing Conditions • Prepare an Existing Conditions Map (Conceptual – no surveying) • Evaluation of Existing Conditions • Prepare Conceptual Designs (up to 3 alternatives) • Prepare 15% Plans / Preliminary Design • Develop an Opinion of Probable Construction Cost • Participation in Client/KCI Conceptual Alternatives Review meeting for d iscussion of alternatives. • Submit brief report summarizing existing conditions, issues and c hallenges. Each alternative design will provide a basis for design of alternatives, the preliminary design plan and an opinion of probable construction cost. A recommendation on the selected alternative will also be provided. 4. Bi-Lo Distribution Center - The project area consists of the following streets: Swinton Street, Middleton Lane, Woodridge Circle and Bi Lo Boulevard, which are in the northern portion of the City near the Miller Road (Highway 564). (See Exhibit A, Site 4) . 10 O ur understanding of the specific issue to be studied are as follows: Stormwater from the large industrial/commercial sites to the west is being conveyed to the development along Middleton Lane, Swinton Drive and Woodridge Circle that is causing flooding issues in several areas. It appears that the Bi Lo Distribution Center has constructed several swales along Bi-Lo Boulevard in an effort to mitigate the flooding. There is a brick swale that was built by Bi-Lo between lots 107 & 109 along Swinton Drive. There is also a pipe that runs very close to the back of a house on Lot 100 on Swinton Drive and then turns and runs between lots 115 & 114, and 113 & 111 to a catch basin along Woodridge Circle. The pipe on lot 100 is failing and the homeowner has dug a ditch to keep stormwater from flowing on to the property. The remainder of the failing pipe is causing sink holes the size of cars on lots 115 & 114. There is also a large swale between lots 121 & 119 along Woodridge Circle that ultimately drains to Gilder Creek. The current piping is undersized for the amount of stormwater that is coming from the industrial/commercial site. This project would most likely be the most complex. Primary Elements of the project study include: • Participation in Client/KCI Kickoff Meeting (site visit) • Watershed/Subwatershed Delineation • Conduct Field Observations to develop Map of Existing Conditions • Prepare an Existing Conditions Map (Conceptual – no surveying) • Evaluation of Existing Conditions • Prepare Conceptual Designs (up to 3 alternatives) • Prepare 15% Plans / Preliminary Design • Develop an Opinion of Probable Construction Cost • Participation in Client/KCI Conceptual Alternatives Review meeting for d iscussion of alternatives. • Submit brief report summarizing existing conditions, issues and c hallenges. Each alternative design will provide a basis for design of alternatives, the preliminary design plan and an opinion of probable construction cost. A recommendation on the selected alternative will also be provided. 5. Oak Park Drive - The project area consists of the following streets: Oak Park Drive, Barrett Drive and Elkwood Street, which relatively in the center of the City near the East Butler Road (State Road 107) thorough fare. (See Exhibit A, Site 5) . O ur understanding of the specific issue to be studied are as follows: The stormwater currently runs between lots 126 & 128 along Oak Park Drive and then is directed behind the house of lot 133, across Elkwood Street and through lot 100 & 228 before it reaches a catch basin along Barrett Drive. This path does not match what is shown in GIS. The pipe running through lot 133 is dangerously close to the foundation. The homeowner for Lot 100 has a dug swale along the property to direct stormwater (assuming this was done to direct it away from the house). There is also a large culvert under Barrett Drive between lots 216 & 220 that goes under the road and between lots 215 & 217 that ultimately drains into Gilder Creek. An easement would be needed to do stream restoration in this area. The City would like to get some options and have stated that a buyout would be considered. 11 P rimary Elements of the project study include: • Participation in Client/KCI Kickoff Meeting (site visit) • Watershed/Subwatershed Delineation • Conduct Field Observations to develop Map of Existing Conditions • Prepare an Existing Conditions Map (Conceptual – no surveying) • Evaluation of Existing Conditions • Prepare Conceptual Designs (up to 3 alternatives) • Prepare 15% Plans / Preliminary Design • Develop an Opinion of Probable Construction Cost • Participation in Client/KCI Conceptual Alternatives Review meeting for d iscussion of alternatives. • Submit brief report summarizing existing conditions, issues and c hallenges. Each alternative design will provide a basis for design of alternatives, the preliminary design plan and an opinion of probable construction cost. A recommendation on the selected alternative will also be provided. 6. Holly Springs - This development was built in the 1960’s or 1970’s and has failing corrugated metal metal storm drain piping and crumbling catch basins. The project area consists of the following streets: Brookbend Road, Springvale Drive , B eechwood Court, Blackgum Court, Brookend Court, Poplar Lane and Old Bridges Road, which are in the northeast portion of the City near the Bridges Road and East Butler Road (State Road 107). (See Exhibit A, Site 6) . O ur understanding of the specific issue to be studied are as follows: In several places, rather than having a 90 degree bend, the piping cuts through the corner of several lots. The ditch was re-done between lots 132-136. The owner of Lot 126 purchased the vacant lot adjoining the property and provided the City with a drainage easement. The City thinks that redoing the storm drain in the entire neighborhood maybe required. Stormwater from this development goes to Gilder Creek. Primary Elements of the project study include: • Participation in Client/KCI Kickoff Meeting (site visit) • Watershed/Subwatershed Delineation • Conduct Field Observations to develop Map of Existing Conditions • Prepare an Existing Conditions Map (Conceptual – no surveying) • Evaluation of Existing Conditions • Prepare Conceptual Designs (up to 3 alternatives) • Prepare 15% Plans / Preliminary Design • Develop an Opinion of Probable Construction Cost • Participation in Client/KCI Conceptual Alternatives Review meeting for d iscussion of alternatives. • Submit brief report summarizing existing conditions, issues and c hallenges. Each alternative design will provide a basis for design of alternatives, the preliminary design plan and an opinion of probable 12 construction cost. A recommendation on the selected alternative will also be provided. Project Schedule KCI shall perform the Services in accordance with the schedule (“Project Schedule”) provided below. Task 1a is 3 months Task 1b is 12 months (some can be performed at the same time) 1. Bishop Heights is 3 months 2. Harrison Plaza is 3 months 3. Knollwood Drive is 2 months 4. Bi-Lo Distribution Center is 3 months 5. Oak Park Drive 3 is months 6. Holly Springs is 3 months Fee and Payment KCI’s fee for completion of the Services in accordance with the Contract Documents is Task 1a is $27,000, Task 1b is $199,600 1. Bishop Heights $27,500 2. Harrison Plaza $38,800 3. Knollwood Drive $20,100 4. Bi-Lo Distribution Center $45,700 5. Oak Park Drive $40,100 6. Holly Springs $27,400 Total for Task 1 is $226,600. KCI shall comply with the invoicing procedures described in the MSA. 13 Special Terms and Conditions In the event of a conflict between the following terms and conditions and the MSA with regard to the Services, the terms and conditions listed in this Special Terms and Conditions Section shall govern. (Any terms and conditions that vary from the MSA to be inserted.) In the event of any other conflict between the terms hereof and the MSA, the terms of the MSA shall govern. IN WITNESS WHEREOF, the Parties have caused this Task Order to be duly executed. Each Party warrants and represents that its respective signatories whose signatures appear below have been and are on the date of signature duly authorized to execute this Task Order. City of Mauldin BY : Signature Name Title Date KCI Technologies, Inc. BY : Signature Name Title Date C. Wesley Hulsey VP, Regional Practice Leader May 2, 2022 14 A ttachment A to Task Order MSA 15 16 17 18 19 20 21 22 23 24 25 26 27 David J. DePratter SC W/WW Practice Leader 04/05/2022 28 29 30 31 32 33 34 A ttachment B to Task Order Contract Documents (Include all relevant documents, attachments, and exhibits.) 35 E xhibit A 36 4 1 6 5 2 3 Laurel Creek Gilder Creek Bridge Fork Creek Reedy River Rocky Creek Reedy River Rocky Creek Imagery Managed by Adam DeMars, South Carolina State GIS Coordinator Imagery Collected byKucera International Hosted Tile service provided by ESRI City Limits (GIS) ~5 sq mi Streams FEMA Zone AE FEMA Floodway ² 0 1,750875 Feet SCDNR Aerial Imagery 2020. 37 PUBLIC WORKS COMMITTEE AGENDA ITEM SUMMARY M EETING DATE: June 6, 2022 AGENDA ITEM: 6b T O: Public Works Committee FROM: City Administrator Brandon Madden SUBJECT: Acceptance of Loblolly Circle Extension (Road Number F-PD-72) REQUEST Direction on the acceptance of Loblolly Circle Extension (Road Number F-PD-72) into the City’s road inventory. HISTORY/BACKGROUND Stanley Martin Homes is working to being construction of the Parkland Phase 2 residential develop off of Loblolly Circle Extension (Road Number F-PD-72). Loblolly Circle Extension is currently a private drive and Stanley Martin has requested that the road to become a public road after the proposed improvements are completed. T he road is located in unincorporated Greenville County . Greenville County has informed the City that they do not have any interest in owning the road because it is not accessible via any other county roads. Direction is being requested on the City’s position on accepting the road into the City’s inventory. ANALYSIS or STAFF FINDINGS Greenville County currently maintains Loblolly Circle from Ridge to the Greenville City/Mauldin City Limits (approximately 315 ft). From this point to the 90 degree bend is jointly maintained, the left side of the road is Greenville City and the right side is Mauldin. Th e Parkland development is in the City limits and has 3 Phases. Phase 1, which is under construction, includes 147 townhomes. Phase 2 will have 93 townhomes and Phase 3 will have 97 townhomes. Phases 2 and 3 will be accessed via Loblolly Circle Extension. Phase 1 has multiple entrances off of Loblolly Circle which is before Loblolly Circle Extension. If taken over by the City, Loblolly Circle Ext. will have to meet the City’s road standards and will include a small portion of the county maintained Loblolly Circle so the City’s road ownership would be continuous. FISCAL IMPACT Minimal. RECOMMENDATION Council direction is being requested. ATTACHMENTS Aerial Map of Loblolly Circle Ext. 38 39 PUBLIC WORKS COMMITTEE AGENDA ITEM MEETI NG DATE: June 6, 2022 AGE NDA ITEM: 6c TO: Public Works Committee FROM: Public Works Director, Matthew Fleahman SUBJECT: Mosquito Spraying REQUEST Authorization is requested to eliminate the city-wide mosquito fogging program. HISTORY/BACKGROUND The City of Mauldin Public Works has actively participated in a city -wide mosquito fogging program for many years. The fogging program’s aim is to eliminate adult mosquitos and larva as a means of vector control. Public Works utilizes a synthetic chemical called Permethrin as the insecticide. Public Works staff work after hours over night on weekends during the months of May through October to fog the entire City. Th e synthetic chemical Permethrin is classified by the United States Environmental Protection Agency as a likely human carcinogen. Excessive exposure to Permethrin can cause nausea, headache, muscle weakness, shortness of breath, and seizures. The spraying of the chemical is regulated, and workers must be licensed as a commercial pesticide applicator to use the product. ANALYSIS or STAFF FINDINGS Public Works has logged a significant number of complaints about the program and has been asked to stop this activity. The fogging of Permethrin not only kills mosquitos, but many other insects including bees. Studies have shown that the chemical is also harmful to aquatic life. Residents have also expressed concerns about the exposure of their pets (cats and dogs) to the chemical. Public Works cannot identify the efficiency of the program; however, studies have shown that fogging will kill only part of the mosquitos in the area for a few days. FINCANCIAL IMPACT The City allocates 5,000 annually to the mosquito control program within the Parks and Grounds budget. RECOMMENDATION Staff does not make any recommendations at this time, this issue is being brought before Committee in response to a number of requests from City residents. 40

Source: City of Mauldin website. First collected Nov 13, 2026.