BAR Staff Reviews (02.02.2026-02.06.2026)
City of Charleston · Berkeley County · meeting of Feb 2, 2026 · Agendas
Open the original document More from City of Charleston
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
February 06, 2026-February 02, 2026
BAR Staff Approvals
Permit Type Description Item Review TypeReview DateMain Address
91 NASSAU ST Single Family/Duplex
Dwelling
Renovation. Change floor plan, replacing metal roof, replacing
wood siding, stucco repair, window &door
repair/replacement, new wood stairs on rear, repair/replace
porch handrails *Scope is a Substantial Improvement (SI)
that includes elevating equipment and installing flood
openings*
BAR - Quick Plan Review02/03/2026
20 IRON FORGE ALY Single Family/Duplex
Dwelling
Emergency replacement of 3rd floor fir doors from water
intrusion and failure. Propose Jeldwen clad/impact units.
Similar color. In-kind select siding replacment from flasing
work and leaks. Same color.
BAR - Quick Plan Review02/03/2026
68 ASHE ST Painting Homeowner Completing Work - Painting Exterior Siding and
Porches
BAR - Quick Plan Review02/03/2026
150 SPRING ST Pool - Single Family/Duplex
Dwelling
Standard 12'X20' inground swimming pool BAR - Quick Plan Review02/03/2026
124 RUTLEDGE AVE Painting Homeowner Completing Work - Touch up and painting of
siding, no replacement or change of color.
BAR - Quick Plan Review02/03/2026
225 CONGRESS ST Roofing - Single
Family/Duplex Dwelling
Replace roof with GAF Timberline HDZ Architectural
Shingles
BAR - Quick Plan Review02/03/2026
10 WESTEDGE ST Painting Refinish all IPE Wood at the Ground Floor. Refinish IPE
items at ground level: Decorative wall panels, planter walls,
benches screen walls and gates. Light sanding and clear
sealer. Sample Panel completed and available to view on
Westedge Street to the right of Publix Entrance.
BAR - Quick Plan Review02/03/2026
55 CLEMSON ST Fence - Single Family/Duplex
Dwelling
Removal of 6'H Wood: 60 LF
Install 57LF of 6'H Stockade (wood) with 1 gate
BAR - Quick Plan Review02/03/2026
17 PITT ST Fence - Single Family/Duplex
Dwelling
remove existing brick driveway to replace sewer line
obstructed by roots. Add in electrical for automatic gate
closer, repair gate. Put back paver
BAR - Quick Plan Review02/03/2026
1110 KING ST Single Family/Duplex
Dwelling
Interior nonstructural restoration within existing floor plan and
footprint including MEP. Framing and foundation repairs in
kind per inspection report. *Scope of work is a Substantial
Improvement (SI) that includes elevating the HVAC to the
DFE*-- REVISED Foundation plan- Structural
BAR - Quick Plan Review02/03/2026
2/9/2026Generated on Page 1 of 4
February 06, 2026-February 02, 2026
BAR Staff Approvals
Permit Type Description Item Review TypeReview DateMain Address
1 PERCY ST Single Family/Duplex
Dwelling
Demo of 2nd floor kitchen and bathroom. Convert space into
new single bedroom and bathroom. Nonstructural framing.
Interior drywall and paint, cosmetic upgrades. Replace
HVAC system with new single system for Levels 1 and
Levels 2
BAR - Quick Plan Review02/03/2026
151 WENTWORTH ST
UNIT 1A
Mechanical REMOVE & REPLACE 1.5 TON SPLIT HEAT PUMP -
TYING INTO EXISTING DUCTWORK - NO OTHER
CHANGES
BAR - Quick Plan Review02/03/2026
87 1/4 WARREN ST Roofing - Single
Family/Duplex Dwelling
reroof
tamko shingle
charcoal
wind class h shingle
BAR - Quick Plan Review02/04/2026
1135 KING ST Single Family/Duplex
Dwelling
Change existing doors to mahogany 4 light doors so that all
three front doors match
BAR - Quick Plan Review02/04/2026
92 S BATTERY ST Roofing - Single
Family/Duplex Dwelling
REMOVE AND INSTALL NEW SHINGLES ON GARAGE.
SAME COLOR - CERTAINTEED LANDMARK SHINGLES
BAR - Quick Plan Review02/04/2026
28 LENOX ST Single Family/Duplex
Dwelling
Replace existing siding with New James Hardie siding BAR - Quick Plan Review02/04/2026
16 ARBOR SPRING CT Single Family/Duplex
Dwelling
New Construction of Single Family Stick Framed Home on a
Raised Slab *See BOAA2025-00702 for slab foundation
approval*
BAR - Quick Plan Review02/04/2026
10 ARBOR SPRING CT Single Family/Duplex
Dwelling
Constructing New Home Behind Existing Home Recently
Renovated *See BOAA2025-00702 for slab foundation
approval*
BAR - Quick Plan Review02/04/2026
172 BROAD ST Single Family/Duplex
Dwelling
Reconstruction of existing dining room and repainting of
exterior wall - same color.
BAR - Quick Plan Review02/05/2026
26 BEE ST UNIT C Building Commercial Single Family New Unit C : STR BAR - Quick Plan Review02/05/2026
54 N MARKET ST Building Commercial Exterior painting and new shutters BAR - Quick Plan Review02/05/2026
265 FISHBURNE ST Roofing - Commercial Partial TPO overlay on the 2 Middle sections on each side of
the skylight roof, no work on the gymnasium roof.
This is a City of Charleston Project.
BAR - Quick Plan Review02/05/2026
167 BROAD ST Mechanical REMOVE AND REPLACE 2 TON HEAT PUMP FOR TJE
GUEST HOUSE. NO OTHER CHANGES NEEDED.
BAR - Quick Plan Review02/05/2026
2/9/2026Generated on Page 2 of 4
February 06, 2026-February 02, 2026
BAR Staff Approvals
Permit Type Description Item Review TypeReview DateMain Address
445 KING ST Painting paint the exterior six windows on the 2nd and 3rd floors to
match existing colors.
BAR - Quick Plan Review02/05/2026
210 CALHOUN ST Painting paint the exterior six windows on the third floor to match
existing colors.
BAR - Quick Plan Review02/05/2026
25 LOGAN ST Painting Homeowner Applicant - Change color of exterior siding from
yellow to Sherwin Williams Heritage Collection color
secession blue (color match to 35 Savage and 106 Broad).
Repaint exterior white trim (no color change)
BAR - Quick Plan Review02/05/2026
1049 MORRISON DR Roofing - Commercial reroof- new single ply roofing membrane. BAR - Quick Plan Review02/05/2026
450 MEETING ST Demolition Complete of rear accessory structure. Structure is 2,000 SF BAR - Quick Plan Review02/05/2026
141 E BAY ST Building Commercial Complete interior upfit in an existing building. Work includes
an exterior fire exit stair case and all typical interior building
trades
BAR - Quick Plan Review02/05/2026
322 KING ST Sign NEED ENCROACHMENT AGREEMENT FOR BLADE SIGN:
Sign A - Non-illuminated dimensional letters (wall sign)
Sign B - Non-illuminated right-angle blade sign on bracket
BAR - Quick Plan Review02/05/2026
86 S BATTERY ST Accessory Structure Demo the existing shed. Build new 2 story building. !st floor
is for storage and 2nd floor is an extra bedroom and bath. It
has a small kitchenette but no stove. The structure shares
the same electrical meter and all utilities. All details are in
the architectural plans by Julia Martin architects and
landscape plans by Elizabeth Pope.
BAR - Quick Plan Review02/06/2026
221 COMING ST Roofing - Commercial Shingle roof repair. BAR - Quick Plan Review02/06/2026
56 STATE ST Demolition Demolish structure complete including footers, foundation,
and slab.
Demolish asphalt parking lot. Base course to remain.
Asbestos Abatement,
BAR - Quick Plan Review02/06/2026
176 BROAD ST Pool - Commercial Installation of in-ground gunite pool and associated
equipment
BAR - Quick Plan Review02/06/2026
101 GORDON ST Single Family/Duplex
Dwelling
revisions: replace existing metal windows with anderson
architectural series windows 1.9.26 Renovate interior of
home to plans and specifications, paint, flooring, cabinets.
Will include full new electric, plumbing, gas, and HVAC.
revisions: replace existing metal windows with anderson
architectural series windows 1.9.26
BAR - Quick Plan Review02/06/2026
2/9/2026Generated on Page 3 of 4
February 06, 2026-February 02, 2026
BAR Staff Approvals
Permit Type Description Item Review TypeReview DateMain Address
17 ALBERTA AVE Single Family/Duplex
Dwelling
MISSING SUBSTANTIAL IMPROVEMENT DOCS - This
scope of work includes adding a second story to the rear of
the non-historic existing house and adding an unconditioned
screened-in porch to the rear of the house. Scope includes
interior renovations of the existing first floor of the home.
BAR approved on 10.08.2025
BAR - Quick Plan Review02/06/2026
Total Reviews: 36
2/9/2026Generated on Page 4 of 4
Source: City of Charleston website. First collected Nov 13, 2026.