RecordWell Data

_02022026-10643

City of Charleston · Berkeley County · meeting of Feb 2, 2026 · Minutes

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City of Charleston Design Review Board Minutes February 2, 2026 4:30 p.m . A virtual meeting of the Design Review Board was held at 4: 30 p.m. on Monday , February 2, 2026 , via Zoom and adjourned at 6:15 p.m. Notice of this meeting was sent to all local news media. Board members present : William “Bill ” Eubanks, Acting Chair, Adriana Carson, Ashley Jackrel , Ben Whitener, Stephanie Tillerson, Lucas Boyd , and Sam Furr Staff members present : David Meeks , Brad Thomas, and Patrick Carlson, recording Chair called the meeting to order at 4: 30 p.m., introduced Board members and Staff, and explained protocol for the meeting. Applications The following applications were considered: (NOTE: Unless otherwise remarked, Chair voted all items, Copy of complete staff comments/recommendations are attached. Copies of all recusals/letters/emails/petitions mentioned during this meeting are on file.) 1. 601-611 Brooking Square Lane – TMS # 262-00-00-028 | DR B202 6-000302 Requestin g preliminary approval for (3) one-story retail buildings (building #1, 2, and 3) Owner : SLS Development, LLC Applicant: The Middelton Group / Karo Wheeler Nei ghborhood/Area: Cainhoy Presenter: Karo Wheeler , Carter Ricks Project Detail: Ms. Wheeler said three of the four proposed buildings on site were requesting approval-the fourth received preliminary approval in December of 2025. She said the building materials approved for building four would be the same ones used for the other three. Public Comment: None Staff Recommendation : Preliminary approval with final review by staff Board Comments/Action: MOTION : Preliminary approval with staff comments #2 and 3 MADE BY : BW SECOND : AC VOTE : FOR 7 AGAINST 0 2. 1647 King St. Ext. – TMS # 464-06-00-001 | DRB2025-0002 76 Requesting conceptual approval for a new 4- s tory storage building Owner : JEAL -K Associates LLC Applicant: SeamonWhiteside and Assoc. Neighborhood/Area: Upper Peninsula Presenter: Kayleigh Roberts , Losse Knight Project Detail: Ms. Roberts said they had incorporated some of the comments made by the DRB in the last submittal. The building was reoriented to align closer to the residential area and had moved parking to the back part of the property. They also added a landscape buffer along the entire perimeter and added more trees throughout the site. Mr. Knight said they considered all the comments discussed at the previous submittal and had worked to reorient the site to better reflect the surrounding community. By fronting the building on King St. Extension, they were able to develop a garden space and adjacent 2 ,700 sq. ft. terraced public plaza along the sides and back of the building. They also developed a sense of appropriate building scale by comparing the published plans for the future Magnolia Landing development that would eventually be built on the other side of I-26. Lucas asked if the basket façade would be in front of a glass material or an opaque wall with glass in the gable. Mr. Knight said it was an opaque wall where the corrugated basket weave pattern was located with glass in the gable . Ashley asked how many units were lost by redesigning the structure. Mr. Knight said he was not sure about the number of units, but the overall building was 5,000 sq. ft. less than the original proposal. Stephanie asked if the team had engaged with the community to see if they were interested in a large plaza situated next to a strip of land owned by Monrovia Cemetery. Mr. Knight said the goal was to align the building with King St. Extension so that would leave the plaza to align with the adjacent neighborhood and open green space owned by Monrovia Cemetery. Ben asked if they could introduce more glazing on the ground level of the King St. Extension side of the building and if they had considered reducing the main massing to three stories high on the southern façade. Mr. Knight said the ground level was a little screened from the street perspective, so they focused on emphasizing the glazing elements on the more visible portions of the building. In addition, he said that the southern façade had been moved away from the adjacent neighborhood by 45 feet so the design team felt it could remain at four stories high with the gable. Bill asked if they had considered using reinforced lawn instead of gravel for the fire lane. Ms. Roberts said the existing portion was already gravel but they could consult with the fire department to explore potential options. Adriana said the proposed dry detention pond may not be enough to offset stormwater effects from a building of that size and asked if they would consider underground stormwater storage. Ms. Roberts said they had not finished all the stormwater considerations but could install some additional storage underneath the adjacent paved area if necessary. Public Comment: None Staff Recommendation : Conceptual approval Board Comments/Action: Lucas said it was an ambitious and strong concept that listened to the board ’s initial concerns but thought that some of the larger motifs could benefit from some simplification and editing. Ben said he applauded the team ’s site analysis and appreciated the proposed changes. He thought the four- story height was still too much but thought the overall height, scale, and mass were appropriate for the area. Bill said it was a strong concept but agreed with Lucas that the building could benefit from some simplification. Sam said it was strong architectural contribution but thought the community could benefit from the softening effects of additional landscaping . MOTION : Conceptual approval with staff comment 1 MADE BY : BW SECOND : AJ VOTE : FOR 7 AGAINST 0 3. 3550 Maybank Hwy. – TMS # 279-00-00-692, 681 | DRB202 6-000303 Requesting conceptual approval for a new recreation building, playground, pickleball, and parking Owner: C ity of Charleston Applicant : LS3P /Nicholas Katsibus Neighborhood/Area: Johns Island Presenter: Mayor Cogswell, Craig Clements, Mary Tweel, David Burt, Project Detail: Mayor Cogswell said the team was really excited about the proposed design and wanted to bring more elevated architecture and civic buildings throughout the City of Charleston. Mr. Clements said they studied local architectural and interior precedents that had a civic quality to inspire the design for the proposed building. Ms. Tweel said the existing site was essentially a wide-open space with a variety of large trees scattered throughout and was located adjacent to an existing Johns Island park. She said the area had a required 75 ft. buffer that they would fill with existing trees and understory plantings. Mr. Burt said the building design had not changed much from the design charrette, but they had developed the building to accommodate the expressed needs of the local community. Bill said the landscape plan looked excellent but suggested using substitutes for the proposed sycamore plantings along the street. He asked if the team had been to BZA-SD for any tree removals. Mr. Burt said they were going to BZA for height issues but were not told they needed to do so for any tree removal. Public Comment: None Staff Recommendation : Conceptual approval Board Comments/Action: MOTION : Conceptual approval MADE BY : BW SECOND : SF VOTE : FOR 6 AGAINST 1 Stephanie voted nay. Minutes 1. Approval of minutes from the 1/5/26 meeting -DEFERRED BY STAFF There being no further bus iness, t he meeting adjourned at 6:15 p.m. Patrick Carlson Clerk of Council ’s Office

Source: City of Charleston website. First collected Nov 13, 2026.