RecordWell Data

_01272026-10651

City of Charleston · Berkeley County · meeting of Jan 27, 2026 · Minutes

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

TRAFFIC AND TRANSPORTATION COMMITTEE January 27, 2026 A meeting of the Traffic and Transportation Committee was held on this date , beginning at 3: 0 3 p.m. in person in the Council Chambers at 80 Broad Street and over Zoom. Committee Members: Councilmember Seekings (Chair), Councilmember Brady (Vice-Chair), Councilmember Gregg, Councilmember Skardon, and Mayor Cogswell Also Present: Michael Mathis, Robert Somerville, Elizabeth Dieck, Melissa Cruthirds, Steven Ruemelin, Chief Walker, Hampton Logan, Katie Dahlheim, Matt Fountain Chair Seekings called the meeting to order Invocation The meeting was opened with a moment of silence led by Chair Seeki ngs. Approval of the December 16 , 2025, meeting minutes On a motion by Mayor Cogswell , seconded by Councilmember Greg g , the Committee voted unanimously to approve the December 1 6 , 2025, Traffic and Transportation meeting minutes. Charleston County Transportation Project Updates (existing projects) Mr. Owsiak said they wanted to cover projects that have recently been completed. They were still waiting to complete some financial closeouts before finishing up the projects. Chair Seekings asked if he could provide them with a brief background on the origin of the funds. Mr. Owsiak said a combination of projects was funded through both the TST and the CTC (Charleston County Transportation Committee) , using the state gas tax fund. The first project was Courtenay Drive at Doughty Street, which involved upgrading the signal at the pedestrian crossing. This project was about 90% complete. East Bay Street had a new sidewalk installed and was finished. Romney Street had bike lanes added and was nearly complete. Stocker/Chadwick Drive had capacity improvements, bicycle and pedestrian upgrades, and curb ramps, all of which were completed . They were waiting for a bus stop and amenities from CARTA. 2 Chair Seekings asked if a full shelter would be put there. Mr. Owsiak said a bus shelter with a trash receptacle. Next were projects under construction. Ashley Hall at Sam Rittenberg was not currently under construction , but had received bids and would go to council on February 19th for the contract award. This was for a right-turn lane with a sidewalk extension . The Central Park Basin Drainage Improvements involved raising the road about 2 feet to help with flooding. Country Club Road and Folly Road Pedestrian Improvements included installing a sidewalk. Fort Johnson Road at Camp saw the installation of a traffic circle at the intersection of Fort Johnson and Camp Road. At Fort Johnson at Secessionville , they were installing a traffic signal with dedicated turn lanes. Main Road and US 17 involved widening Main Road between Bees Ferry Road and Chisolm Road, as well as constructing a new interchange at the intersection with US-17, which would include flyover ramps. Chair Seekings asked how that project was funded. Mr. Owsiak said this was funded through the 2016 TST. Chair Seekings asked who the contractors were. Mr. Owsiak said this was between Archer United and Banks Construction. Maybank and Woodland Shores planned to install a pedestrian crosswalk on Maybank Highway at the Pour House. Seventy percent of the storm drainage work and sidewalk on Woodland Shores was completed. Oceanic Street was designated for a multi-use path from SK8 Charleston Park to the Magnolia Development entrance. Chair Seekings asked if it was just parallel to Oceanic. Mr. Owsiak said yes. Next, there were the advertised projects. Ashley Avenue at Congress Street was scheduled for the installation of pedestrian signals and curb bulb-outs to improve traffic calming and pedestrian safety. The project at Ashley Avenue at Huger Street would be combined with the one at Ashley Avenue at Congress, along with other initiatives. This included installing pedestrian signals, crosswalks, and curb bulb-outs. At Calhoun Street near the James Island Connector, they planned to widen the road and make intersection improvements. Chair Seekings asked when coming off the connector if there would be an island . Mr. Owsiak said when coming off the connector, two lanes would go straight onto Calhoun, and people would not have to take the Lockwood ramp. Chair Seekings asked if they would be widening south towards Fourth Street. Mr. Owsiak agreed, and there will be a dedicated left lane turn to help get into the hospital. Central Park Road at Riverland Drive will see a combination of intersection improvements with dedicated turn lanes from Central Park onto Riverland. A sidewalk will be installed along Riverland, and existing sidewalks will be upgraded. The City Golf Course Crossing and Sidewalk Connection will involve installing a signalized crossing and sidewalks to improve pedestrian safety. On Columbus Street and America Street, an engineering study will be conducted, and mid-block crossing measures such as curb extensions and rectangular rapid flashing beacons 3 will be installed to enhance pedestrian crossings. On Fleming Road, approximately 700 linear feet of 5-foot sidewalk will be built from Maybank to Standard Way. The Folly Road Bike/Pedestrian project, part of the Rethink Folly Project, plans to install a sidewalk from Ellis Creek to George L. Griffith Blvd and will include restriping Folly Road. Old Towne Road will see the construction of a 10-foot multi-use path connecting the entrance to State Park with the Old Towne Creek County Park sidewalk. Finally, at Saint Philip Street and Coming Street, signalized mid-block crossings will be installed. Chair Seekings asked if they could get someone to bid on this project. Mr. Owsiak said they advertised this project at least three times . Mayor Cogswell said he and Mr. Mathis had discussed this issue. They learned that they couldn't get any contractors to respond to their bids, but he understood from talking with other Mayors in different parts of the state that their situation was unique and specific to Charleston. He inquired if they were experiencing the same problem. Mr. Owsiak said they were seeing signs of improvement and that they were starting to get multiple bidders on projects, whereas they previously received only one or none. He noted that it was difficult to attract new contractors to the area and to break into the construction market. Chair Seekings said that the last time they received an update from them, there were two main points discussed: bundling projects to increase their number and make them more attractive, and reconfiguring some bonding requirements on smaller projects so contractors wouldn't have bonding power that could allow them to bid on these projects without meeting those requirements. He asked if there had been any progress on these matters. Mr. Owsiak said they were presently working on those. Chair Seekings asked if there was a tool that would alert them when a contractor was on call for projects below a certain amount. Mr. Owsiak agreed and mentioned they are considering creating their own field operations crews to manage sidewalk projects that don ’t require much drainage work or traffic control. Savannah Highway Capacity Improvements involved three combined projects. These included intersection upgrades at DuPont and Stinson, at Wappoo , and at Magnolia and Avondale. Old Town Transportation Improvements aimed to enhance Orange Grove at the Sam Rittenberg intersection, along with bicycle and pedestrian enhancements throughout the corridor. Next are Projects in Design. Coming Street at Bogard Street involves installing curb extensions, signage, and RRFBs to improve pedestrian safety. At Coming Street and George Street, the improvements include traffic calming measures and pedestrian safety enhancements at that intersection. Folly Road at Harbor View Road considers traffic and pedestrian upgrades, such as 150 linear feet of new sidewalk, a new crosswalk on the northern leg of Folly Road, and handicap ramps and pedestrian signals. Magwood Drive at Ashley Crossing Drive aims to enhance safety and capacity at the intersection by installing either a roundabout or a traffic signal, along with pedestrian safety improvements to safely cross all four approaches. Chair Seekings asked, other than funding, what other factors did they consider in determining whether to put a traffic light up or put in a traffic circle. 4 Mr. Owsiak said it was based on traffic counts because if they had balanced intersections, roundabouts would make more sense. Maybank Highway Improvements. An additional outbound lane will be added to Maybank Highway. Improvements will be made at the intersection of Meeting Street with Morrison Drive and Pleasant Street, including upgrades to pedestrian crossings. Signal timing will be adjusted, and approximately 200 linear feet of existing sidewalk, curb, and gutter along the north side of Mount Pleasant Street will be updated. Along Mutual Drive, about 450 linear feet of 5-foot sidewalk will be constructed from Cheroke Hall Lane to US-17. Chair Seekings asked if they were working with the LCRT engineers on the Meeting Street at Morrison Drive Project. Mr. Owsiak said they were waiting for their plans to make sure their designs fit together. North Nassau Street. Installation of 325 feet of sidewalk along N. Nassau Street between Cedar Street and Cool Blow Street. Northbridge Bike and Pedestrian Improvements include constructing a new bicycle and pedestrian bridge connecting Northbridge Park to Azalea Drive. Chair Seekings said that each time they applied for the building grant through the County, the committee sent a letter of encouragement and support. He asked if they needed another letter. Additionally, they had been discussing via chats in the BCDCOG with the DOT whether the bridge would be repaired or replaced. He assumed they were coordinating with the DOT as well, because if the DOT decided to build a completely new bridge there, then the project would become redundant. Mr. Owsiak agreed. Riverland Drive Bike/Ped Phase 3 will include about 725 linear feet of sidewalk construction between Henderson Road, Franklin Gaillard Road, Rutledge Avenue, and Fishburne Street. They will also conduct a study and install mid-block crossing countermeasures, which may include curb extensions and RRFBs. On Savage Road, a sidewalk will be built between Etiwan Avenue and the first entrance to Castlewood, and between Henry Tecklenburg Drive and US-17 at the Savage Road intersection. This aims to improve the intersection for trucks to safely turn onto and off Savage Road and to extend the right-turn lane on Savage Road. At the SC-61 and Muirfield Parkway Crosswalk, they plan to enhance pedestrian safety by relocating an existing crosswalk, increasing its visibility, and adding sidewalk connections. On Sycamore Avenue, a sidewalk will be installed along SC-61 from West Ashley Greenway to Sycamore Avenue, connecting to crossing improvements at SC-61 and Sycamore. Chair Seekings said that the project at Fourth Street, which connected to Calhoun, would have two features: one visible and one not. The project would also include a check valve at the base of the bridge to prevent water from flowing back from the river toward the western edge of the peninsula. He asked whether the base of the first left turn would have an all-way pedestrian crossing. Mr. Owsiak said yes. Chair Seekings asked if that was the first in the County because it was the first one for the City, and if there was another anywhere else. Mr. Owsiak said not that he was aware of. 5 The Mayor left the chamber at 3:29 p.m. SCDOT Road Transfer Request from City Stormwater Management – Culbertson Drive Mr. Fountain explained that this was a road they were taking over as part of the Windermere Drainage Improvement Project, which was approved by the Public Works Committee. The committee supported the project, and they were installing a box-covered structure under a small frontage road in front of the school in that neighborhood. DOT had asked them to take control of the entire road as part of this work. On a motion by Councilmember Gregg, seconded by Councilmember Skardon, the Committee voted unanimously to approve the SCDOT Road Transfer Request from City Stormwater Management on Culbertson Drive. Discussion Regarding E-Bikes Chair Seekings said they received many comments about the need to act on e -b ikes on the streets and sidewalks of the City of Charleston. His commitment as Chairman of the committee was that they were going to do something meaningful that they could enforce. The Mayor returned to the Chamber at 3:34 p.m. Councilmember Gregg said this was an issue in District One. They were concerned that pedestrians could be run over by kids on e-bikes doing stunts on C ity streets. The government needed to step in and make the necessary changes. The state was slow to respond to these kinds of problems, and they were hopeful that the City could come up with some more restrictive measures. The City police department issued a memo, and they wanted to ensure whatever they did would be enforceable. They were optimistic that the committee and police department could develop a proactive solution to improve safety and reduce injuries caused by e-bikes. The Mayor left the Chamber at 3:35 p.m. After reviewing the documentation and observing what other municipalities have enforced, they decided to implement a complete ban on e-bikes on City sidewalks. They also want to establish an age restriction, especially for kids under 16, who should not be riding them. Mr. Ruemelin s ai d they had an ordinance that specified that a motorized bicycle cannot be ridden on a sidewalk or shared-use path, but there was no legal definition of a motorized bicycle. That term was outdated and lacked a formal legal definition. The state did define what e-bikes were, which are essentially low-speed electrically assisted bikes with two or three wheels and operable pedals. The main difference was that they had electric motors of no more than 750 watts or one horsepower, with a speed limit of 20 miles per hour when operated by a rider weighing 170 lbs. on a paved, level surface. If they issued a ticket, it would be hard to prove the rider was going 20 miles per hour with someone weighing 170 lbs. or more. Chair Seekings said they could not equip their police vehicles with scales to weigh a bicyclist. Mr. Ruemelin said that federal law requires a label indicating the e-bike's horsepower. State law does not address the use of e-bikes on sidewalks or shared-use paths, but it authorizes regulation of bicycle use. The Mount Pleasant ordinance set an age limit, allowing children under 17 to ride on sidewalks and shared-use paths. Adults can also ride on shared-use paths if they are accompanied by a child under seven. A sidewalk is considered a shared-use path if there is no bike lane on the adjacent road. 6 Chair Seekings said that it was an unenforceable ordinance. If they were going to put something on the books, it had to be understandable and enforceable . Mr. Ruemelin said that other C ities around South Carolina, like Greenville, d id not have laws regulating e-bikes on sidewalks or shared-use paths. Columbia ban ned them except for motorized wheelchairs. Hilton Head allow ed e-bikes on bicycle and pedestrian pathways. Isle of Palms, Kiawah Island, and Seabrook Island prohibit e-bikes on beaches, while Myrtle Beach permits them on cart paths, bike paths, and pedestrian pathways. One recommendation they considered is to prohibit e-bikes on sidewalks and shared-use paths without exceptions, or to prohibit them with certain exceptions. Some of those exceptions include the Mount Pleasant rules for children and for speed. Chair Seekings said 17 were not children. Anyone 17 or under was an exception. Mr. Ruemelin said Chief Walker had his own opinion, but he was against the age and speed. Chair Seekings said if they were old enough to ride an e-bike, they should not be allowed to ride on sidewalks. Mr. Ruemelin said they could specify which sidewalks or shared-use bike paths are allowed for use. They discussed the possibility of confiscating or forfeiting e-bikes , but faced issues with due process. Their municipal court lacked jurisdiction, and there was no state law authorizing them to seize the property. They suggested setting specific periods, days, or times when e-bikes could be operated on sidewalks or shared-use paths. They could also implement licensing and registration requirements, but the main challenge would be the administrative burden. Chair Seekings said they had a bike registration ordinance, but it was abandoned because it did not work. He wanted to know what their recommendation was and where they go from here. Mr. Ruemelin said the current ordinance addresses motorized bikes, but they need to clarify the definition. They are prohibited on sidewalks and shared-use paths. Chief Walker said that , from the police and public safety perspective, Mr. Ruemelin summed it up well. It was mainly about shared-use pathways and the reckless use of vehicles on the street. They didn't want to complicate things and believed it would require an educational period, partnering with the school district, and involving parents. They needed the public to understand what they were seeing and be aware of some public safety issues that were concerning from a police point of view. Councilmember Gregg expressed concern about whether they clarified the definition and if policing stunt riding could address most of this behavior. He asked if they would need to bring kids under 18 to family court and prosecute them there. Mr. Ruemelin said the issue was that if they issued a citation to a child, it would likely go to the parent. Chief Walker said they need to manage expectations and that this ordinance won't solve all their problems. Like any other City ordinance, it must be realistic and enforceable. Since they can't issue citations to a six-year-old on an e-bike, it should include the entire community. It needs to be practical and manageable to ensure public safety. Chair Seekings asked if their team was educated to recognize what an e-bike looked like compared to a regular bike. 7 Chief Walker said it was from an educational standpoint and that they needed to talk to the parents. They needed an ordinance that had more substance than what they currently had. Councilmember Gregg said this was an interim step, and if possible, they could require registration. He asked if they had the infrastructure for bike registration, whether they could implement something for e-bike registration, and if someone wanted to ride an e-bike in the city, they would need a decal. Chief Walker said they could stop anyone who was recklessly operating anything on the roadway that could threaten public safety. The ordinance specifically related to the e-bike, but they could now enforce it for reckless behavior in the street. Chair Seekings said that if they concentrate on the location rather than the individuals involved and find the right solution — specifically banning e-bikes from pedestrian passageways — the registration issue would become less important because they already know the rule: they cannot be on the sidewalk. He believed that registration would face administrative challenges since being on the sidewalk already violates a City ordinance. He asked if Mr. Ruemelin could draft a clear and precise definition of an e-bike that would help remove them from the sidewalks. Additionally, they needed a commitment from Chief Walker ’s team that, if they implement a new policy, there will be education and enforcement. Chief Walker said this was something they did not sweep under the rug, so if it was on the books, they would address it. Councilmember Skardon asked if the current motorized bike ordinance requires people to wear helmets. Chair Seekings said no. Councilmember Skardon asked whether that could be considered as part of this: if someone is riding an e-bike, they must wear a helmet. Mr. Ruemelin said it was permitted, even though this was from 1979, but they did have the authority to require helmets. Also, if someone was on a bike and on the road, they had to obey all the same laws, which meant stopping at stop signs. There was also a provision in the state law that addressed reckless operations. Chair Seekings said that people wearing helmets was another way to help identify someone on an e-bike. Councilmember Gregg said that there was information indicating e-bikes could be easily tampered with, even if the nameplate showed the e-bike was 750 watts and traveled less than 20 miles. He inquired whether they could draft an ordinance to determine if an e-bike had been modified or tampered with to increase its speed, which could make it more dangerous. Chair Seekings stated they would no longer be considered an e-bike and would be subject to speed limit laws. Mr. Ruemelin said they could add th is , and there would be a training component to th is as well. Chair Seekings said they needed to keep it simple but also effective. They were feeling the impact of this, which indicated there was a demand for them to act quickly and responsibly. 8 With there being no further business, the Committee adjourned the meeting at 3:52 p.m. Clerk of Council ’s Office Donna Constance

Source: City of Charleston website. First collected Nov 13, 2026.