RecordWell Data

_01262026-10650

City of Charleston · Berkeley County · meeting of Jan 26, 2026 · Minutes

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City of Charleston Committee on Public Works & U tilitie s J a n u a ry 2 6 , 2 0 2 6 A meeting of the Committee on Public Works & Utilities was held this date beginning at 5:02 p.m. over video conference call. Notice of this meeting was sent to all local news m e d ia . Present: Councilmember Perry Waring (Chair), Councilmember Boyd Gregg (Vice Chair), Councilmember Kevin Shealy, Councilmember Leslie Skardon, Councilmember Michael Seekings, and Mayor Cogswell (5:06 p.m.). Also Present: Steve Kirk, Ron Bucci, Robbie Somerville, Magalie Creech, Kaylan Koszela, Mandi Herring, Julia Copeland, Matt Alltop, Matt Fountain, Elizabeth Dieck, Jennifer Cook, and Mae-Lee Colwell. L in k to m eetin g : https://w w w .youtube.com /w atch?v= U O U zzm zC Iy4 A. Invocation The meeting opened with an invocation led by Councilmember Shealy. B. Approval of Public Works and Utilities Committee Minutes On a motion by Councilmember Gregg, seconded by Councilmember Shealy, the Committee voted unanimously to approve the minutes from the December 15, 2025 meeting. C. Request to Set a Public Hearing There was no request to set a public hearing. D. Old Business There was no old business. E. Acceptance and Dedication of Rights-of-Way and Easements There were no acceptances or dedications of rights-of-way and easements. F. Temporary Encroachments Approved by The Department of Development Services (For information only) 1. 937 Fish Camp – Installing irrigation encroaching into City right of way. This encroachment is temporary. 2. 202 King St. – Installing right angle sign encroaching into City right of way. This encroachment is temporary. 3. 15 State St. – Installing blade sign encroaching into City right of way. This encroachment is temporary. 4. 115 Wentworth St. – Installing awnings encroaching into City right of way. This encroachment is temporary. 5. 51 State. St. – Installing two right angle signs encroaching into City right of way. This encroachment is temporary. 6. 999 Oakcrest Drive – Installing blade sign and awning encroaching into City right of way. This encroachment is temporary. 7. 157 Brailsford – Installing fence encroaching into City maintained drainage easement. This encroachment is temporary. 8. 1242 Harriman Ln. – Installing fence encroaching into City maintained drainage easement. This encroachment is temporary. 9. 2089 Blue Bayou – Installing fence encroaching into City maintained drainage easement. This encroachment is temporary. 10. 561 Spiral Ramp Rd – Installing fence encroaching into City maintained drainage easement. This encroachment is temporary. 11. 256 Newsday St – Installing fence encroaching into City maintained drainage easement. This encroachment is temporary. 12. 356 Lantana Dr – Installing fence encroaching into City maintained drainage easement. This encroachment is temporary. 13. 4159 Westerly Ln. – Installing fence encroaching into City maintained drainage easement. This encroachment is temporary. 14. 1432 Eutaw Battalion Dr – Installing fence encroaching into City maintained drainage easement. This encroachment is temporary. 15. 7 Vale Rd. – Installing brick lined driveway encroaching into City right of way. This encroachment is temporary. Chair Waring said that the items were standard encroachments and presented for information only. There were no requests for permanent encroachments. Ordinance authorizing the Mayor to execute on behalf of the City of Charleston a Right- of-Way and Utility Easement to Charleston Water Systems over parcels currently designated as Charleston County Tax Map Numbers 457-08-01-027, 457-08-01-083 and 457-08-01-087 (entryway to Charleston Place Hotel) for the purpose of constructing and maintaining water lines. Julia Copeland said that CWS had added a water main underneath a property owned by the City, so the item was to allow for CWS to have access to maintain the water main. On a motion by Councilmember Seekings, seconded by Councilmember Shealy, the Committee voted unanimously to approve item I1 . Ordinance to Adopt Cooper Hotel Seawall O&M Plan : The agenda item is to pass an ordinance authorizing the Mayor to adopt on behalf of the City an Operations and Maintenance agreement for the Cooper Hotel Seawall. The seawall is a bulkhead coastal structure that can be used to alter flood risk and revise the effective FEMA Flood Insurance Rate Maps (FIRMs) of the adjacent area once reviewed and approved by FEMA in a Letter of Map Revision (LOMR). Ron Bucci said that the seawall was acting as a trip wall similar to the one located at Magnolia Place , and was altering the Flood Map. The difference between the item and the Magnolia Place trip wall was that the City would cover 50% of the cost for maintenance , which had been approved during the July City Council meeting . The item was being expedited to City Council and Ways and Means for a first reading so it could be submitted to FEMA. Councilmember Skardon asked if there was a cost-share agreement with Magnolia Place, or if that was fully paid for by the City. Mr. Bucci said the Magnolia Place trip wall was fully covered by the developer. On a motion by Councilmember Seekings, seconded by Councilmember Gregg, the Committee voted unanimously to approve Item I2. Acceptance of the Memorandum of Agreement between the City of Charleston, the Town of James Island, and Charleston County for James Island Creek TMDL MS4 monitoring. Ron Bucci said that the item was an intergovernmental agreement to monitor the Town of James Island ’s watershed for fecal contamination. Monitoring began in July of 2021 to try and find the source of the contamination. The City shared 58% of the total cost based on the location of homes by the watershed. The cost would not exceed $40,000.00. The current contract in place could be renewed for 5 additional one-year contracts. The item would also be expedited to City Council and Ways and Means. Councilmember Skardon made a motion for approval, which was seconded by Councilmember Shealy. She asked when they would receive results for the item. Mr. Bucci said he could send the results to her, and that recommendations had been made but they were still trying to dial in on the pollutants, which were mostly localized in the upper reaches of the watershed from dog waste and septic issues. Councilmember Skardon asked if the results would be given to the Committee quarterly or annually. Mr. Bucci said the results would be given to the State, but he would share them with the Committee. Chair Waring asked if there had been any input from Charleston Water System. Mr. Bucci said that exact coordination with CWS had happened with the County. Chair Waring called on Matt Fountain to give comment. Mr. Fountain said that CWS had done testing on the water to determine that the likely culprit for the contamination was from a combination of dog and human septic sources and were doing thermal testing on the water to try and find a leak. James Island Public Service District had been working with CWS for years on this issue. Chair Waring told Councilmember Skardon that people had pushed back against the installation of a sewage grinder pump because they didn ’t want to cover the ongoing cost of upkeep, even with a grant. On a motion by Councilmember Skardon, seconded by Councilmember Shealy, the Committee voted unanimously to approve Item I 3 . Mr. Bucci said that items I4 through I6 were meant to allow the mentioned firms to utilize 2026 Budget funds to continue their contracts . Mayor Cogswell made a motion to take items I4 through I6 together. Amendment to existing contract with Ardurra (formally WK Dickson) to increase contract amount and allow continued support for stormwater plan review. Funding is allocated for this item within the Stormwater Operations Budget for FY 2026. Amendment to existing contract with Woolpert to increase contract amount and allow continued support for stormwater plan review. Funding is allocated for this item within the Stormwater Operations Budget for FY 2026. Amendment to existing contract with Kimley-Horn to increase contract amount and allow continued support for stormwater plan review. Funding is allocated for this item within the Stormwater Operations Budget for FY 2026. On a motion by Mayor Cogswell, seconded by Councilmember Shealy, the Committee unanimously approved items I4, I5, and I6. J. Stormwater Management Department Update 16. Concord Pump Station Upfit – Project Update Steve Kirk gave a presentation on the project ’s progress. The pump had been constructed in 2000 and serviced the area from Calhoun to Market Streets. It had been improved with updated materials over the years. He showed a diagram of the pump and how it connected to the streets via tunnels. It had been difficult for them to work on the pump station within six months and while keeping the pump operational. He showed pictures of the replacement parts and new system that allowed them to operate the pump remotely. 17. Sandcroft Outfall Cleaning – Project Update Mr. Fountain said that the project was a good example of the City ’s ability to complete a project with a quick turnaround and a smaller budget. He showed an arial map of the S andcroft outfall sectors and said that they had gotten more efficient at cleaning them over the years, going from 3 to 9 months to 3 to 6 months. Cleaning was performed via hydroexcavation, which he showed pictures of. They had moved from using consultants for cleaning to using in-house cleaners. Chair Waring thanked Mr. Fountain and his team for their work. K. Miscellaneous Business Authorization for Mayor to execute the sixth amendment to contract between City of Charleston and Black and Veatch in the amount of $185,000.00 to provide additional planning and engineering services for Engineering with Nature for the Tidal and Inland Flood Risk Management Study, including nature-based flooding solutions for West Ashley, James Island, and the Peninsula . Kaylan Koszela said that the item was a contract with the City ’s Water Plan Team. They had previously worked with Black and Veatch on other Planning and Stormwater projects. On a motion by Mayor Cogswell, seconded by Councilmember Shealy, the Committee voted unanimously to approve Item K1. L. Adjournment There being nothing further to discuss, the meeting was adjourned at 5:32 p.m.

Source: City of Charleston website. First collected Nov 13, 2026.