CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
MEETING RE SULTS
JANUARY 14, 2026 4:30 P.M. 2 GEORGE STREET
BOARD MEMBERS PRESENT: Seaton Brown, James Meadors, Joel Trantham, Steve Ramos (Chair),
Jay White
STAFF MEMBERS PRESENT: B.D. Wortham-Galvin, Lawrence Courtney, Brad Thomas
A. MINUTES
1. Review of Minutes from the December 12, 2025, Meeting
DECISION: APPROVED
MOTION: Approval of Minutes
MADE BY: Meadors SECOND: Brown VOTE: FOR: 4 AGAINST: 0
Jay White abstains
B. APPLICATIONS
1. 635 King Street
BAR2025-002342 | TMS #460-08-02-007 | Cannonborough/Elliottborough
Council District 4 | New Construction | Height Districts 3.5, 6, 7
Old and Historic District, Old City District
Requesting Approval of a mockup panel.
Owner: Ron Owen, Evening Post Publishing Company
Applicant: Christian Sottile, FAIA
NOTE: The Board will convene on the parcel directly west of 47 Line Street on
January 13, 2026, at 8:30 a.m. for a site visit.
DECISION: APPROVED WITH CONDITIONS
MOTION: Approval of Mockup with Board and Staff Comments and Conditions and Final
Review By Staff
MADE BY: White SECOND: Meadors VOTE: FOR: 5 AGAINST: 0
STAFF COMMENTS:
• This is a relatively large and complex mockup which shows workmanship on a variety
of conditions.
Board of Architectural Review – Large
Meeting Results | January 14, 2026 Page 2
• An additional submittal was prepared by the Applicant showing where conditions
occurred on the mockup that would not actually occur on the building - these conditions
are limited and should not lead to confusion. This clarification has been transmitted to
Board members.
• Different sealant colors may be required at varying conditions. Care will need to be
exercised in their application. Despite some unfortunate placement of sealants on the
mockup, Staff is assured based on discussions with GC and Applicant that everyone is
treating this seriously and that these conditions will be effectively handled.
• It is understood that the Applicant is showing two mortar conditions on the mockup with
the lighter mortar being at the top of the structure.
• The copper seaming was uneven and will need more attention to workmanship during
construction. The Applicant may want to discuss potential staining of copper elements
onto materials below with the Board.
• While the overall workmanship shown on the mockup is good, translating this level to a
large building may be challenging and yet the involved parties appear very
committed to attaining that goal.
STAFF CONDITIONS:
1. A thorough, building-wide examination of sealants required will be needed to address
the many conditions requiring them.
2. Attention to the workmanship of the copper seaming during construction is required.
STAFF RECOMMENDATION: Approval of Mockup with Board and Staff Comments and
Conditions
BOARD COMMENTS:
• Slight offsets in the moldings are a detail that needs to be adjusted.
• The railing system that’s between the two columns there’s a piece of wood on the
bottom of it that the right side of it is much lower than the left side; not sure what that
is.
• Caulking/sealants have been mentioned by staff and applicant and need to be taken
care of.
• The transitions of copper and molding to the brick: the gaps that were there were
significant.
• There needs to be acceptable copper seaming and consistency in how it is rolled.
• The copper sheet metal work needs attention and if the workers are curious how to do
the compound curvature have them go see the roof of the gazebo in Hampton Park;
it’s ridge seam is perfect, so it is achievable.
• There’s a varying gap in the big arch between the brickwork and the metal. It feels
like the accuracy could be tightened on that.
• Where the trim at the lower part of the balcony met the brick there needs to be a
solution to turn the brick back so that could meet rather than being scribed to the brick.
• To be the exemplar that HCF and PSC are talking about the execution needs to be
flawless.
• What we often target is the joints; where things meet up needs care and attention.
For full Board discussion go to the City of Charleston’s YouTube channel.
Board of Architectural Review – Large
Meeting Results | January 14, 2026 Page 3
2. 989 Morrison Drive | WITHDRAWN BY STAFF
BAR2025-002340 | TMS #459-01-01-001 | East Central | Council District 4
New Construction | Height District 4-12 | Historic Corridor District
Requesting Conceptual Approval of a new multi-family building.
Owner: Scott Fuller (representative)
Applicant: Brad Brown
NOTE: Withdrawn by staff prior to meeting.
3. 474 Meeting Street
BAR2025-002335 | TMS #459-05-03-071 | Eastside | Council District 4
New Construction | Height Districts 2.5-3 | Height District 4
Old and Historic District, Old City District
Requesting Conceptual Approval for a mixed-use, affordable housing building.
Owner: Star Gospel Mission
Applicant: Bryanna Dering-Weyrich (LS3P)
DECISION: APPROVED WITH CONDITIONS
MOTION: Conceptual Approval with Staff Comments and Conditions and Board Condition
to restudy the form and elevations and materials to reinforce the massing as presented
MADE BY: Trantham SECOND: White VOTE: FOR: 5 AGAINST: 0
STAFF COMMENTS:
• This project involves the construction of 3 new structures across the site (P.04/P.05). The
two other structures on Nassau Street have already received Preliminary Approval by
the Board. The extent of the entire project is over two height districts, but this specific
submittal is in Height District 4.
• City Council passed a Resolution on 24 January 2023 establishing The Priority Status
Affordable Housing Program that provides special benefits and advantages during
the development review process to residential and mixed-used developments that
make certain impactful contributions toward the City’s supply of affordable housing.
This project comes under the auspices of this program. Thus, while in general the
Board does not consider cost when deliberating on projects, the BAR must balance the
Priority Status Affordable Housing Program with maintaining quality design for all
residents in all types of housing situations.
• The context of the site varies in height, mass and building typologies (p. 19) and this
project sits mid-block between Meeting and Nassau Streets making it less visible,
particularly from Meeting Street. Staff support height, scale and mass of the proposal.
• Staff support the metal fence with stucco knee wall and posts as shown as well as the
hardscape/landscape material board.
• Staff appreciate the alignment of the chapel with the site line to the structure from
Meeting Street, terminating with a garden at the rear.
• Staff support the distinction made in the gable roof form to highlight the chapel
portion of the structure as well as the differentiation in ground level materials and the
playful yet purposeful arranged window pattern in the chapel mass drawing from
Charleston precedents (P.13).
Board of Architectural Review – Large
Meeting Results | January 14, 2026 Page 4
• The residential mass and elevation are less visible from Meeting Street. Staff
appreciate the attempt to break down the mass and provide a vertical rhythm through
recessed drains. While the Applicant is unable to provide windows in all potential
fenestration moments, the articulation of the blank wall where one might expect
windows is appreciated and provides visual relief on the wall surface.
• Staff support the material detail precedents shown (P. 14/15) and note that
workmanship and craft will be key in the success of this modest architectural direction.
STAFF CONDITIONS:
1. Bring physical samples of materials to the Preliminary review.
STAFF RECOMMENDATION: Conceptual Approval with Board and Staff Comments and
Conditions
BOARD COMMENTS:
• The precedent photos for details/materials were good.
• The roof feels imbalanced with the staggering of the windows.
• Staggering of the windows on the southside feels awkward because the wall is
divided into three sections by the downspouts.
• Appreciate the modern look set back from the public right of way.
• The precedents in the city where you showed the fenestration is unbalanced are all on
non-primary facades; they are not on the streetscape side. The fenestration on the
chapel/west side does look unbalanced. The secondary and tertiary sides are not as
much of a bother.
• Have a different take. There is a beauty in the simplicity of the design. It does have a
clear and restrained language. There’s a little bit of play in it but there’s also a
gathering of certain elements in a rhythm that is easily read. The windows where they
are brought together and bridge the different levels are successful.
• Where there’s a concern is in the massing of these elements. Page 12 diagram 1
shows the 4 elements and diagram 2 shows how the fenestration rhythm works with
those elements in the 1, 2, 3, 4 set up. But with the applied gutter and scupper it’s
probably going to read more like the diagram on page 11 where it reads as two
separate masses. The window strategy is reinforcing the two separate masses with
playful windows on one and not on the other. The two strategies of how you are trying
to break down this building are conflicting with each other. The form is possibly more
successful but then it’s the fenestration and materials and/or offset needing to break
up those masses. The way that this building sits (pg. 19), especially on Nassau Street,
it’s the vertical breaking up of it that is going to help that mass sit in a different
context (the use of siding is not enough to do that). Having a better resolution on that
would help at this stage.
• There needs to be some resolution between the materials and form. The playfulness of
the window and the offset aren’t a problem because they correspond to how the
recess at the first level works; but it’s working against your strategy to break down the
mass.
• For a mid-block building that is so deeply imbedded within one of the city’s larger
blocks, the logic and the strategy is understandable. When you strip a building down
to its bones, the bones and the detailing have to shine. Economy is in everybody’s mind
Board of Architectural Review – Large
Meeting Results | January 14, 2026 Page 5
as you proceed to detailing and construction, but what you have here will require a lot
of precision to achieve it well. That is not impossible, but it will be a challenge.
• Agree that given the mid-block placement, there’s a little more artistic freedom.
Understanding that it has a civic presence (it’s a chapel) and if it had a more
symmetrical gable, it would have a more domestic or residential appearance. That
being the special part of the site, can get on board with it. Wonder if the playful
windows could be more playful on the chapel piece to really highlight it as this unique
part of the project.
• Agree that contemporary details can be hard to pull off. Anytime there’s no rake on a
roof, that’s a concern. Be wary that when you try to be overly inventive with details,
there might be a reason they were done a certain way for a long time.
• Some of these comments are about restudy of the specific material pattern and the
way that it’s being treated.
For full Board discussion go to the City of Charleston’s YouTube channel.
4. 162 Ashley Avenue
BAR2025-002334 | TMS #460-15-04-061 | Medical Complex | Council District 6
New Construction | Height District 85/30 | Old City District
Requesting Preliminary Approval of an apartment building with ground-level retail.
Owner: Evan Marko & John Marko
Applicant: Jeffrey Rengering
DECISION: APPROVED WITH CONDITIONS
MOTION: Preliminary Approval with Board and Staff Comments and Conditions with
Final Review by Staff
MADE BY: White SECOND: Trantham VOTE: FOR: 5 AGAINST: 0
STAFF COMMENTS:
• This project received Conceptual Approval by the Board on 14 May 2025.
• Board and Staff Comments included:
- Study a more volumetric shift and/or an increase in the change of depth that
occurs on the elevation at material transitions.
- Explore other higher-end, contemporary and more context-sensitive material as an
alternative to fiber-cement siding (such as nickel or channel gap) and provide
samples at Preliminary review.
• Applicant did not make a volumetric shift but, as noted, the metal panel face is offset
6” from the channel gap finish and they have contrasted the lighter metal panel with
the darker channel gap to accentuate this dimensional change. Staff is satisfied with
these approaches.
• The applicant has substituted the previous Charleston Green fiber cement board with
painted 5/8” channel gap siding. Staff support this substitution.
• Staff support modifications and details as shown in this submittal.
STAFF CONDITIONS: No staff conditions
Board of Architectural Review – Large
Meeting Results | January 14, 2026 Page 6
STAFF RECOMMENDATION: Preliminary Approval with Board and Staff Comments and
Conditions with Final Review by Staff
BOARD COMMENTS:
• Appreciate the level of detail in this drawing set because it did satisfy a lot of the
questions related to a potential volumetric shift mentioned last time. The differentiation
of the metal panels and the siding are going to create that varied façade that we are
looking for. It really addresses that previous comment.
• There’s a nice play in the patterns in both the masonry and the siding type materials
that are here and it leads to a nicely balanced façade and it emphasizes all the
principles we would want it to at this point.
• In the mockup proposal, most of the building conditions were met in there, but the
elements that feel like their missing are the porch elements, which are the ones that
really engage the public space. The underside of the porch, the way the terrace is
being met, how the materials are all transitioning as they meet at the porch, the
mockup panel would need to be adjusted to include those elements
For full Board discussion go to the City of Charleston’s YouTube channel.
5. 31 George Street / 84 Society Street
BAR2025-002339 | TMS #457-04-04-112/008/007/017/113/025 | Downtown
Council District 8 | New Construction | Height District 6 | Old and Historic District
Requesting Final Approval for the construction of two new buildings.
Owner: GS Acquisitions LLC
Applicant: Goff D'Antonio Associates
DECISION: APPROVED WITH CONDITIONS
MOTION: Final Approval with Board and Staff Comments and Conditions and returning
balconies to the original depth with Final Review By Staff
MADE BY: White SECOND: Meadors VOTE: FOR: 5 AGAINST: 0
STAFF COMMENTS:
• This project received Preliminary Approval by the Board on 13 December 2023. There
are two buildings, labeled A & B, as part of this submission. The Applicant has met all TRC
requirements in multiple rounds during 2024 and 2025.
• For Building A, staff had no comments at Preliminary and Board Discussion centered
around confirming with Applicant that the 3D material is for profile display only; that no
3D printed materials are proposed for use on the building. Applicant confirmed they were
for representation only.
• For Building B, Board had no comments/discussion at Preliminary and Staff Condition was
as follows:
- “Society is a narrow and quiet street, and street trees are desired. However, please
confirm their locations through zoning as they appear to encroach 10’ sidewalk
minimum, but the sidewalk depth is determined by the location of the existing
building.:
Board of Architectural Review – Large
Meeting Results | January 14, 2026 Page 7
- The Applicant has addressed all street tree issues to the satisfaction of TRC and
received their approval.
• While Applicant did not set up a preview meeting with Staff, given that this project is at
Final and based on the application at hand, Staff are comfortable with the packages for
Buildings A and B as submitted. Staff noted in the meeting extemporaneously that we
were not aware of the changes to the balconies (which a preview meeting would have
helped clarify).
STAFF CONDITIONS:
1. Any modifications to approved drawings required for code or fire department
compliance, or contemplated during construction, must be approved by the BAR prior to
undertaking the changes. Any modifications/substitutions to the materials or elements
approved at the Final BAR Hearing must be specifically noted, reviewed and approved
on the Mockup sample panel.
2. Deviations from previously approved submissions, if determined by the BAR Staff during
or after completion of construction to be a downgrade of the quality of the project and
inconsistent with previous approvals, are not approved, whether noted or not by Staff
during our review of “For Permit” drawings.
3. All construction work is to consider adjacent or nearby structures and the protection and
monitoring thereof. If any work involving significant vibration may be reasonably
suspected to be a threat to historic or new adjacent or nearby structures, a program must
be in place addressing how these structures are to be protected and monitored. A copy of
this protection and monitoring plan is to be transmitted to Staff for review prior to work.
4. A separate signage package will need to be submitted for all words and graphics to be
placed on the building, as these are not considered part of any approvals or motions for
this Board discussion.
STAFF RECOMMENDATION: Final Approval for both Buildings A and B with Final Review by
Staff of For Permit Drawings.
BOARD COMMENTS:
• Multiple Board members not expecting changes in the balconies in this submittal noting
they are character defining features and want the balcony configuration returned to
that approved at Preliminary as key elements of the elevations (regardless of whether
they are accessible). The design (particularly the depth) of the balconies needs to be
in line with that which was previously approved.
• This is not the first time with this project where there is a discrepancy from one hearing
to the next.
For full Board discussion go to the City of Charleston’s YouTube channel.
Board of Architectural Review – Large
Meeting Results | January 14, 2026 Page 8
6. 126 Coming Street
BAR2025-002337 | TMS #460-16-01-078 | Radcliffeborough | Council District 4
Category 1 | c. 1816 | Height District 2.5-3 | Old and Historic District
Requesting Final Approval of exterior color changes and stucco on a Category 1 building.
Owner: Cathedral of St. Luke and St. Paul
Applicant: Meadors Inc.
DECISION: APPROVED
MOTION: Final Approval with FRBS in the Permit.
MADE BY: White SECOND: Trantham VOTE: FOR: 4 AGAINST: 0
James Meadors recused.
STAFF COMMENTS:
• 126 Coming Street is a Category 1 building which necessitates Board review.
• Based on the Applicant’s thorough stucco and paint analysis, staff support the color
selections as shown in the micrographic studies of the original stucco and paint.
STAFF CONDITIONS: No staff conditions
STAFF RECOMMENDATION: Final Approval with FRBS in the Permit.
For full Board discussion go to the City of Charleston’s YouTube channel.
7. 134 Saint Philip Street
BAR2025-002328 | TMS #460-12-02-038 | Radcliffeborough | Council District 4
Category 3 | c. 1887 | Height Districts 2.5-3, 4 | Old City District
Requesting an appeal of Staff’s decision to deny a roofing material change from slate to
copper.
Owner: Diocese of Charleston
Applicant: Chris Berwick
DECISION: DENIED
MOTION: Appeal of Staff’s decision is denied with Board and Staff Comments and
Conditions
MADE BY: White SECOND: Meadors VOTE: FOR: 5 AGAINST: 0
STAFF COMMENTS:
• The requested Appeal stems from an in-person interaction with Staff at the City’s
Permit Center in December 2025.
• The Applicant sought approval to change the steeple roofing material on the
southwestern portion of the church from slate shingles to copper.
• While copper is not considered a material downgrade from a BAR perspective, the
proposed change would alter a character-defining feature of the building and differ
from the original roofing material used at the time of construction in 1887.
Board of Architectural Review – Large
Meeting Results | January 14, 2026 Page 9
• Additionally, a copper roof would not replicate the existing overlapping and
diamond-shaped shingle patterns characteristic of the current slate installation.
• For these reasons, Staff denied the proposed change in material at the administrative
level and advised the Applicant to seek Board review and approval.
STAFF CONDITIONS:
1. If the Appeal is upheld by the Board, the existing shingle pattern and configuration
found on the existing steeple shall be replicated on the proposed steeple.
2. Regardless of the roof material, the applicant must apply for a building permit to
begin construction.
3. Any additional repairs to the steeple not outlined in this application shall be “in-kind”.
BOARD COMMENTS:
• In cases like this everybody is sensitive to the fact that it’s a small parish. It’s a 140-
year-old roof. Staff made the right call because we are preservation guidelines in our
Ordinance. Staff is just looking at the Ordinance and they are applying it. You’ve
heard the phrase character defining a couple of times and the steeple of that church
really is and the detailing on the slate is a big part of that. Sometimes the
preservation of our historic architecture can be a challenge for small institutions and
the small institutions are often the stewards of our most important buildings. We just
can’t go messing around with the steeples of historic Charleston.
• The longevity of the slate roof shows the success of the slate roof. The condition your
roof is in now is dangerous and it should be removed as quickly as possible. But the
final solution should be install of slate. You don’t nail slate, you hang it and it’s not
intended to be tight, it’s intended to move in the wind. If it’s installed correctly, you can
have another very long-lasting roof.
For full Board discussion go to the City of Charleston’s YouTube channel.
8. Update to BAR Policies
See emails with attachments of policies. Physical copies will be provided at the meeting.
DECISION: APPROVED
MOTION: Approval of BAR Policies
MADE BY: White SECOND: Trantham VOTE: FOR: 5 AGAINST: 0
STAFF COMMENTS:
• Opt-In Policy was adopted by BAR-S 8 January 2026.
• Bar Policy Statement for Alternative Energy was originally adopted by BAR-L on 10
December 2025. BAR-S passed the policy on 11 December 2025 with the addition of
“unless appropriately concealed” to the end of the 3rd paragraph.
For full Board discussion go to the City of Charleston’s YouTube channel.