_01052026-2087
Town of Mount Pleasant · Charleston County · meeting of Jan 5, 2026 · Minutes
Open the original document More from Town of Mount Pleasant
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
TOWN OF MOUNT PLEASANT
BIDS & PURCHASES COMMITTEE
Monday, January 5, 2026
Municipal Complex, Council Chambers
100 Ann Edwards Lane, Mount Pleasant, SC 29464
Mi
nutes
Cl
ick here to listen to recording
Powerpoint Presentation
1.Ca
ll to Order
Chairman Brownstein called the meeting to order at 8:30 a.m. and led
with a brief moment of silent reflection before proceeding with the
agenda. Council Members Mike Tinkey and Alex Crosby were present
2. Approval of Minutes from the December 1, 2025 Meeting
Motion for approval was made by Council Member Tinkey, seconded by
Council Member Crosby. The motion carried unanimously.
3. Public Comments
No members of the public came forward to provide comments.
4. Award of a Design Contract for the West Coleman Bike Lanes
Project
Tammy Harness, Chief Financial Officer, presented information on the
West Coleman Bike Lanes Project. She explained that on November
20th, the Town received SCDOT award concurrence for the design
portion of the project. The design work would be procured utilizing the
Town's on-call engineering program previously approved by the
Committee.
Ms. Harness detailed that the project would implement the State's first
bicycle signalized corridor, providing contiguous and dedicated bike
lanes along Coleman Boulevard. The project would begin at the base of
the Arthur Ravenel Bridge at Patriots Point Road intersection and end at
Bids and Purchases
January 5, 2026
Page 2
the Central Business District at Vincent Drive/Pherigo Street. The
corridor includes nine existing signalized intersections requiring
modification to include bicycle traffic signal heads and operational
improvements.
The project would also include resurfacing and restriping between
Houston Northcutt and Harbor Gate Drive to close existing gaps in the
dedicated bike lanes. Additionally, the existing right turn lane from
westbound Coleman Boulevard onto Houston Northcutt Boulevard would
be widened to accommodate the westbound dedicated bike lane.
Council Member Mike Tinkey asked how the system would work and
requested more information from James Aton, Deputy Director, from
Engineering Development Services. Mr. Aton explained that in early
2025, the Town was awarded $1,250,000 in TA Set Aside grant funding.
He identified that the intersection at Houston Northcutt had been a pinch
point preventing continuous bike lanes on West Coleman due to the
width constraints.
Mr. Aton elaborated that the bicycle corridor would feature dedicated
bicycle signal heads that, when cyclists are detected, would provide a
leading bicycle interval, allowing cyclists to enter intersections while all
vehicular approaches have red signals. This system would be similar to
the lead pedestrian intervals already in place, making the corridor safer
and more convenient for cyclists.
When questioned about the timeline, Mr. Aton indicated that the design
would take approximately 12 months to complete, followed by about 12
months for implementation, with completion expected by the end of
2027.
Mr. Brownstein noted that Mount Pleasant is ahead of other Lowcountry
communities regarding cycling and pedestrian infrastructure and
expressed excitement about eventually having an uninterrupted, safe
bike lane from the bridge to the beach.
Motion to approve contracting with TranSystems Corporation in the
amount of $221,455.12 to design the West Coleman bike lanes was
made by Council Member Tinkey, seconded by Council Member Crosby,
and unanimously approved.
5. Award of a Contract for 1946 Enclave Drive Pipe Lining
Tammy Harness explained that this project involved lining a pipe at 1946
Enclave Drive in the Long Point neighborhood due to a sinkhole that had
formed. The Committee had previously approved the establishment of
Bids and Purchases
January 5, 2026
Page 3
agreements with contractors to perform various stormwater repair and
rehabilitation services on an on-call basis.
Council Member Tinkey asked for clarification about the location and
nature of the issue. Andy Weis, Public Services Director, explained that
there is a drainage box at the street where water flows into a pond,
eventually reaching an outfall. A hole in the 42-inch pipe (approximately
140 feet long) needed to be lined, and the box required repair.
Mr. Weis confirmed that the work could be completed without excavating
between the two houses where the sinkhole had formed. He noted that
the Enclave area has many metal pipes that might eventually need
similar attention. Once approved, contractors would typically complete
the work within three months.
Motion to approve contracting with James White Construction, LLC in
the amount of $117,834.28 to perform pipelining services at 1946
Enclave Drive was made by Council Member Tinkey, seconded by
Council Member Crosby, and unanimously approved.
6. Adjourn
The meeting was adjourned at 8:40 a.m.
Respectfully submitted by,
Gina Artrip
January 5, 2026
Source: Town of Mount Pleasant website. First collected Nov 13, 2026.