RecordWell Data

_01052026-2087

Town of Mount Pleasant · Charleston County · meeting of Jan 5, 2026 · Minutes

Open the original document More from Town of Mount Pleasant

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

TOWN OF MOUNT PLEASANT BIDS & PURCHASES COMMITTEE Monday, January 5, 2026 Municipal Complex, Council Chambers 100 Ann Edwards Lane, Mount Pleasant, SC 29464 Mi nutes Cl ick here to listen to recording Powerpoint Presentation 1.Ca ll to Order Chairman Brownstein called the meeting to order at 8:30 a.m. and led with a brief moment of silent reflection before proceeding with the agenda. Council Members Mike Tinkey and Alex Crosby were present 2. Approval of Minutes from the December 1, 2025 Meeting Motion for approval was made by Council Member Tinkey, seconded by Council Member Crosby. The motion carried unanimously. 3. Public Comments No members of the public came forward to provide comments. 4. Award of a Design Contract for the West Coleman Bike Lanes Project Tammy Harness, Chief Financial Officer, presented information on the West Coleman Bike Lanes Project. She explained that on November 20th, the Town received SCDOT award concurrence for the design portion of the project. The design work would be procured utilizing the Town's on-call engineering program previously approved by the Committee. Ms. Harness detailed that the project would implement the State's first bicycle signalized corridor, providing contiguous and dedicated bike lanes along Coleman Boulevard. The project would begin at the base of the Arthur Ravenel Bridge at Patriots Point Road intersection and end at Bids and Purchases January 5, 2026 Page 2 the Central Business District at Vincent Drive/Pherigo Street. The corridor includes nine existing signalized intersections requiring modification to include bicycle traffic signal heads and operational improvements. The project would also include resurfacing and restriping between Houston Northcutt and Harbor Gate Drive to close existing gaps in the dedicated bike lanes. Additionally, the existing right turn lane from westbound Coleman Boulevard onto Houston Northcutt Boulevard would be widened to accommodate the westbound dedicated bike lane. Council Member Mike Tinkey asked how the system would work and requested more information from James Aton, Deputy Director, from Engineering Development Services. Mr. Aton explained that in early 2025, the Town was awarded $1,250,000 in TA Set Aside grant funding. He identified that the intersection at Houston Northcutt had been a pinch point preventing continuous bike lanes on West Coleman due to the width constraints. Mr. Aton elaborated that the bicycle corridor would feature dedicated bicycle signal heads that, when cyclists are detected, would provide a leading bicycle interval, allowing cyclists to enter intersections while all vehicular approaches have red signals. This system would be similar to the lead pedestrian intervals already in place, making the corridor safer and more convenient for cyclists. When questioned about the timeline, Mr. Aton indicated that the design would take approximately 12 months to complete, followed by about 12 months for implementation, with completion expected by the end of 2027. Mr. Brownstein noted that Mount Pleasant is ahead of other Lowcountry communities regarding cycling and pedestrian infrastructure and expressed excitement about eventually having an uninterrupted, safe bike lane from the bridge to the beach. Motion to approve contracting with TranSystems Corporation in the amount of $221,455.12 to design the West Coleman bike lanes was made by Council Member Tinkey, seconded by Council Member Crosby, and unanimously approved. 5. Award of a Contract for 1946 Enclave Drive Pipe Lining Tammy Harness explained that this project involved lining a pipe at 1946 Enclave Drive in the Long Point neighborhood due to a sinkhole that had formed. The Committee had previously approved the establishment of Bids and Purchases January 5, 2026 Page 3 agreements with contractors to perform various stormwater repair and rehabilitation services on an on-call basis. Council Member Tinkey asked for clarification about the location and nature of the issue. Andy Weis, Public Services Director, explained that there is a drainage box at the street where water flows into a pond, eventually reaching an outfall. A hole in the 42-inch pipe (approximately 140 feet long) needed to be lined, and the box required repair. Mr. Weis confirmed that the work could be completed without excavating between the two houses where the sinkhole had formed. He noted that the Enclave area has many metal pipes that might eventually need similar attention. Once approved, contractors would typically complete the work within three months. Motion to approve contracting with James White Construction, LLC in the amount of $117,834.28 to perform pipelining services at 1946 Enclave Drive was made by Council Member Tinkey, seconded by Council Member Crosby, and unanimously approved. 6. Adjourn The meeting was adjourned at 8:40 a.m. Respectfully submitted by, Gina Artrip January 5, 2026

Source: Town of Mount Pleasant website. First collected Nov 13, 2026.