Backup Material
Oconee County · Oconee County · meeting of Nov 16, 2026 · Other
Open the original document More from Oconee County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
OCONEE COUNTY
PLANNING COMMISSION
415 S. Pine St. Walhalla, SC 29691
864.638.4218
OconeeSC.com
planninginfo@oconeesc.com
The meeting will be broadcasted live on the County’s YouTube channel, which can be found on the
County’s website at www.oconeesc.com.
Rev. 07/2025
COMMISSION MEMBERS
David Nix, District 2 Mickey Haney, At-Large
Teresa Spicer, District 1 Brit Adams, District 3
Joe Fravel, District 4 Jake Marcengill, District 5
Mike Johnson, At-Large
AGENDA
6:00 pm, Monday, November 16, 2026
Oconee County Council Chambers
1. Call to Order
2. Invocation
3. Pledge of Allegiance
4. Approval of minutes from November 2nd, 2026.
5. Public Comment for Non-Agenda Items (4 minutes per person)
6. Commission Member Comments
7. Staff Comments
8. Discussion regarding revisions to Chapters 26, Road & Bridges, Chapter 32, Unified
Performance Standards & Chapter 38, Zoning
a. Public Comment
b. Discussion/Vote
9. Adjourn
- CODE OF ORDINANCES
Chapter 26 ROADS AND BRIDGES
Oconee County, South Carolina, Code of Ordinances Created: 2026-05-07 10:21:27 [EST]
(Supp. No. 55)
Page 1 of 35
Chapter 26 ROADS AND BRIDGES1
ARTICLE I. IN GENERAL2
DIVISION 1. UNIFIED PUBLIC ROAD STANDARDS FOR THE UNINCORPORATED
AREAS OF OCONEE COUNTY
Sec. 26-1. General provisions.
These general provisions shall apply to both private roads and drives and public roads. The definitions
section of the land development and subdivision chapter of the Oconee County Unified Performance Standards
Ordinance (Ordinance 2008-20, [as codified in chapter 32, article VI, §§ 32-211—32-226]) shall apply to this article.
(1) Survey standards. Route surveys and plats shall be prepared and survey data entered thereon in
accordance with the most recently adopted version of the "Minimum Standards Manual of the Practice
of Surveying in South Carolina" established by the South Carolina Board of Registration for Professional
Engineers and Land Surveyors, provided that all elevations information shall refer to Mean Sea Level
Datum or other established datum (with a minimum of two benchmarks). Accuracy of plats and
attendant data shall be no less that than required in said manual for Class B Suburban Land Surveys.
(2) Utilities. When utilizing a road right-of-way, all utility lines shall be buried at a depth of at least 36
inches. Such lines shall be located a minimum of two feet, outside the portion of the road to be
surfaced to prevent having to cut into the paved surface or reconstruct drainage structures to serve
abutting properties. In order to prevent future road cuts, utility stub-outs shall be added to all utility
lines extending beyond the roadway to each property line.
(3) Road signs. Road name signs shall be installed at all intersections within a subdivision. All other signs
shall be installed as required by and at the direction of the county engineer or his/her designee. All
signage will be in accordance with the manual of uniform traffic control devices. The developer shall be
responsible for all cost of road signage for private drives, private roa ds, and proposed county roads (at
a cost determined by resolution of county council from time to time) prior to acceptance of road by the
county. Any person who shall willfully or maliciously damage, deface, remove or otherwise tamper
with a sign erected by a subdivider or the county designating the name of any county road shall be
1Cross reference(s)—Buildings and building regulations, ch. 6; environment, ch. 12; floods, ch. 16; planning and
development, ch. 24; utilities, ch. 34.
State law reference(s)—County roads, bridges and ferries generally, S.C. Code 1976, § 57 -17-10 et seq.
2Editor's note(s)—Ord. No. 2008-19, adopted Dec. 16, 2008 repealed Art. I, §§ 26-1—26-9, in its entirety. Articles
1—9 enacted new provisions to read as herein set out. Prior to amendment, Art. I pertained to similar
subject matter and derived from Ord. No. 1975, §§ 1—4, adopted Feb. 20, 1975; Ord. No. [19]82-14, §§ II—
IV, adopted Dec. 21, 1982; Ord. No. [19]83[0]3, §§ A—F, May 3, 1983; Ord. No. [19]83-[0]7, §§ 1—3, adopted
Aug. 16, 1983; Ord. No. [19]91-[0]9, §§ I, II, IV—VIII, adopted Sep. 17, 1991; Ord. No. 99-22A, § I, adopted
Aug. 17, 1999; Ord. No. 2001-18, adopted May 1, 2001; Ord. No. 2006-11, §§ 1—5(1), 5(2), adopted May 1,
2006; Ord. No. 2007-09, adopted Sep. 18, 2007 and Ord. No. 2008-11, adopted Aug. 5, 2008.
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 2 of 35
guilty of a misdemeanor and punished in accordance with this article. In addition thereto, such person
shall be liable to the county for the cost incurred by the county as a resu lt of said criminal acts.
(4) Submission of road plans. Construction plans for roads shall include accurate topographic information
with increments of no more than five feet. In addition, all such plans should note the following items:
the location and dimensions of all drainage features; routes of surface wat er drainage for the entire
development; a typical cross section of the proposed roadway; road profiles; horizontal and vertical
curve designs; right-of-way dimensions; the location of all cuts and fills; finished grade elevation; all
necessary erosion control practices, which may include but are not limited to, permanent vegetation,
lined or piped ditches or vegetated waterways; and contact information of all interested parties.
(5) Road alignment and location. The direction and pattern of roads shall take advantage of the land
contour to eliminate or reduce excessive cutting and filling, and provide roads with reasonable grades.
(Ord. No. 2008-19, Art. 1(1—5), 12-16-2008)
Sec. 26-2. Private road standards and regulationsReserved.
Oconee County shall have no responsibility for nor control of the design, engineering, construction,
inspection or maintenance of private driveways, drives and roads in Oconee County and shall only be involved with
private driveways, drives and roads to enforce these regulations and to the extent required for the county to carry
out its other duties and functions, such as approving the subdivision of property .
(a) Private driveways. Private driveways shall serve no more than three residential dwellings, and shall be
maintained by the property owner(s). No design standards shall apply to private driveways, but driveways
must comply with applicable building and fire codes.
(b) Private drives. All private drives existing and in use at the time of adoption of these regulations, as well as
those private drives under construction prior to the time of adoption, shall be exempted from the standards
contained in this section. This exemption shall also extend to those private drives approved by the planning
department prior to the time of adoption. All other private drives shall:
(1) Serve no more than ten lots or dwellings;
(2) Have a minimum road right-of-way of 50 feet, or an appropriately executed private roadway easement
as defined by these regulations;
(3) Have an appropriate encroachment permit from either the county or the South Carolina Department of
Transportation;
(4) Have a minimum driving surface width of 20 feet constructed of no less than five inches of compacted
crushed stone or gravel base; a minimum height clearance of 13½ feet; and appropriate
documentation from a professional engineer licensed by the State of South Carolina certifying the
maximum weight limit of any bridge or culvert located along the drive. All bridges and any culvert over
which a private drive crosses a perennial stream must include appropriate signage (located at each end
of the bridge) displaying the structure's weight limits;
(5) Be maintained by an individual, association of property owners, or commonly held by the property
owners fronting the private drive;
(6) Comply with all current fire regulations and codes;
(7) Shall serve no more than ten dwellings, and shall connect to another road, either public or private, on
one end only. In the event proposed construction and/or development will result in an existing private
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 3 of 35
drive serving 11 or more dwellings, the existing drive shall be upgra ded so as to meet the standards put
forth in these regulations for private roads;
(8) Parcel boundaries may extend to centerline of the road, with the appropriate road right -of-way shown
on all plats and deeds;
(9) Be named in accordance with adopted E-911 addressing regulations and procedures;
(10) Allow at least 100 feet of sight distance for each ten miles per hour of the posted speed limit where the
private drive intersects a public road. The sight distance shall be measured from a seeing height of 3½
[feet], offset 15 feet from edge of road, to an object 4¼ feet in height above the gr ade of the public
road, as stated in SCDOT's 1996 Access and Roadside Management Manual. If the proposed drive does
not meet the sight distance requirement, a waiver must by signed by the individual(s) constructing the
private drive stating that the property owner(s) is liable and responsible for any accidents, injuries,
problems, and property damage resulting from improper sight distance;
(11) Meet all applicable stormwater management and sediment control regulations;
(12) Be approved in writing by planning commission or designated staff prior to submission of plat(s) to the
register of deeds for recording. The following shall be prominently printed on the plat(s):
"THE ROAD RIGHT-OF-WAY SHOWN ON THIS PLAT SHALL BE PRIVATE DRIVES NOT OWNED,
MAINTAINED OR SUPERVISED BY OCONEE COUNTY, AND WERE NOT CONSTRUCTED PURSUANT TO
ANY PLAN FOR FUTURE ACCEPTANCE BY OCONEE COUNTY. ROAD RIGHT-OF-WAYS SHOWN UPON THE
PLAT SHALL NOT BE ACCEPTED FOR MAINTENANCE BY OCONEE COUNTY AT ANY TIME IN THE FUTURE
UNLESS CONSTRUCTED IN ACCORDANCE WITH ALL ADOPTED OCONEE COUNTY REGULATIONS.
MAINTENANCE OF THE RIGHT-OF-WAY SHALL BE THE RESPONSIBILITY OF _______."
(13) Signage shall comply with the manual for uniform traffic control devices.
(c) Private roads. Private roads shall provide vehicular access and road frontage to developments, or sections of
developments, containing more than ten dwellings. All private, nondedicated roads shall be prominently
indicated as such on plats prior to subdivision approval. Maintenance arrangements f or such roads must be
noted in writing on subdivision plat submittals and must be subsequently recorded. The development served
by a private road shall have direct access into a public road, and no such private road shall be laid out so as
to serve property outside the development. All private roads shall:
(1) Serve a minimum of 11 lots;
(2) Have a minimum road right-of-way width of 50 feet;
(3) Be designed in accordance with the regulations set forth in subsections 26 -3(e) and (r) of these
regulations;
(4) Be constructed in accordance with the regulations set forth in subsections 26 -3(f) and (r) of these
regulations;
(5) Be maintained by an association of property owners or the developer and be designated on all plats
and recorded in appropriate deed covenants and restrictions, or an appropriately executed private
roadway easement as defined by these regulations;
(6) Parcel boundaries may extend to the centerline of the road, with the appropriate right -of-way
designated on all plats and deeds;
(7) Be legally certified for compliance by a surveyor/engineer licensed by the State of South Carolina;
(8) Be named in accordance with adopted E-911 addressing regulations;
(9) Meet all stormwater management and sediment control regulations;
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 4 of 35
(10) Be properly approved in writing by planning director prior to submission of plat(s) to the register of
deeds for recording. The following shall be prominently printed on the plat(s):
"THE ROAD RIGHT-OF-WAY SHOWN ON THIS PLAT SHALL BE PRIVATE ROADS, NOT OWNED,
MAINTAINED OR SUPERVISED BY OCONEE COUNTY AND NOT CONSTRUCTED PURSUANT TO ANY PLAN
FOR FUTURE ACCEPTANCE BY OCONEE COUNTY. ROAD RIGHT-OF-WAY SHOWN UPON THE PLAT SHALL
NOT BE ACCEPTED FOR MAINTENANCE BY OCONEE COUNTY AT ANY TIME IN THE FUTURE UNLESS
CONSTRUCTED IN ACCORDANCE WITH ALL OCONEE COUNTY REGULATIONS. MAINTENANCE OF THE
RIGHT-OF-WAY SHALL BE THE RESPONSIBILITY OF THE _______."
(11) Have installed signs that control the traffic flow in a safe manner as specified by standards in the Manual for
Uniform Traffic Control Devices.
With the exception of the requirements put forth in this section, all private roads shall meet the requirements for
all public roads as defined by this article.
(Ord. No. 2008-19, Art. 2(1—3), 12-16-2008; Ord. No. 2013-16, § 2A, 7-16-2013; Ord. No. 2022-23, § C, 10-18-
2022)
Sec. 26-3. Public roads.
(a) Continuation of adjoining road system. The proposed road layout shall extend existing roads on a logical
course at a width which meets the minimum required by this article. A minimum 100:1 taper section shall be
used to transition from one width to another.
This section establishes design, construction, and inspection standards for existing County roads to be
reconstructed and public roads proposed for acceptance into the Count y road system. Compliance with this
section is a condition of consideration for acceptance and does not itself constitute acceptance. Private roads
serving land development shall be governed by chapter 32, article VI.
(a) Existing road system. Existing County roads shall, where appropriate, be used to improve connectivity and
access throughout the County. New direct access to a County road shall generally be limited to one private
driveway, private drive, or private road per parcel. Additional access may be allowed when required by
applicable law or emergency-access requirements, or when approved by the County Engineer or designee
through the encroachment-permit process based on traffic safety, circulation, or site -specific conditions. Major
subdivisions and commercial developments shall utilize internal road systems and minimize direct connections
to County roads. Minor subdivisions shall, where feasible, provide a plan showing an access connection from the
parent parcel to any remaining property that may be developed in the future. The access limitations established
by this subsection shall apply to new or additional access proposed after adoption of this chapter. Nothing in
this subsection shall require the removal or modification of a lawfully existing acc ess point solely because it
does not conform to the current access limitations.
(b) Road Public road system coordination. The County road system within a subdivision shall be coordinated
with existing, proposed, and anticipated roads (hereinafter "surrounding roads") outside the subdivision, as
determined by the county or the State of South Carolina. Subdivision roads shall intersect to promote continuity
and connectivity within the County transportation network. Roads shall connect with surrounding roads at safe
and convenient locations and where necessary to permitfacilitate the efficient movement of traffic between
residential neighborhoods by emergency serviceand access by public safety vehicles. Subdivision roads shall only
enter arterial roads when absolutely necessary. Whenever connections to surrounding roads are required by
this section, the road Where a future connection to an existing, proposed, or anticipated road is planned, the
roadway and right-of-way shall be extended and the street developed to the property line of the subdivided
property (or to the edge of the remaining undeveloped portion of a single tract ) at the point where the
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 5 of 35
connection to the anticipated or proposed street is expected. In addition, the permit -issuing authority may
require temporary turnarounds to be constructed at the end of such streets pending their extension when such
turnarounds appear necessary to facilitate the flow of traffic or accommodate emergency vehicles. All
temporary dead-end streets must be approved by the planning director and the county engineer. to allow for
future connection.
(c) Road names and signs. A proposed road whichname shall be approved under article II of this chapter at the
Preliminary Plan stage when a Preliminary Plan is obviously in alignment with orrequired by chapter 32, and
before the name is shown on a final plat or other recordable instrument. A road that is an extension of an
existing named road shall bear the name of the existing road. Except for the above,that name unless a different
name is approved under article II. The developer shall install the signs required for a road proposed for County
acceptance in accordance with section 26-107 and the approved construction plan.
(d) Survey standards. A person proposing a road for County acceptance shall provide a survey plat prepared in no
case shall the name accordance with the applicable standards for the practice of a proposed road duplicate or
be phonetically similarsurveying in South Carolina. Elevations shall be tied to an existing road name, irrespective
of the use of suffix (identified datum and at least two benchmarks. Construction plans shall comply with
subsection (e)(12). Subdivision plat and private-road, avenue, boulevard, drive, place, court, lane, etc.). It shall
be unlawful for any person in laying out any new road to name such road on any final plat or instrument,
without first obtaining the approval of the Oconee E-911 Addressing Office. submittal requirements are
governed by chapter 32.
(d) Residential buffers for collector or arterial roads. Where a subdivision abuts or contains an existing or
proposed collector or arterial road; lots which abut or are adjacent to these existing or proposed collector or
arterial roads shall face a local road. Other treatment may also be required, as necessary, for adequate
protection of the landscape and residential properties and for separation of through and local traffic. Special
treatment may be required, such as screen planting contained in a nonaccess reservati on along the rear
property line adjacent to the arterial road.
(e) Road design ( Roadway geometric design. Roadway geometric design shall follow the applicable standards
and criteria). In general, geometric criteria for road design shall be in accordance with standards of the South
Carolina Department of Transportation (SCDOT). Said standards are those contained in the latest established by
the 2018 edition of "A Policy on Geometric Design of Highways and Streets", published by the American
Association of State Highway and Transportation Officials. Local and collector residential roads (public) shall be
designed in accordance with the following standards. Existing County roads to be reconstructed and roads
proposed for County acceptance shall also meet the following minimum requirements for the road
classification. In the event of a conflict, an express requirement of this subsection shall govern. Alignment. A
road proposed for County acceptance shall follow the terrain, so far as practicable, to reduce unnecessary
cutting and filling while meeting the applicable standards for grade, drainage, sight distance, accessibility, and
emergency access.
(1) Minimum right-of-way, pavement, and shoulder widthwidths shall be as follows:
Road Type Design Speed Right-of-Way Pavement Shoulder
Arterial1 Arterial 40 mph minimum 66′ or greater foot
minimum 28′ 24 feet 10′ 8 feet
Collector 30 mph minimum 50′ foot minimum 24′ 22 feet 8′ 6 feet
Major local 50′ 22′ 6′
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 6 of 35
Minor local 50′ 20′ 4′
1 As determined by county engineer
For high density residential or nonresidential subdivisions or portions thereof, additional right -of-way
or pavement width shall be provided when determined as necessary by the planning commission or
county engineer.
(2) Cul-de-sacs shall comply with current fire regulations and codes. Dead-end streets without turnarounds
are prohibited. All unpaved islands located within perimeters of a cul -de-sac shall be round in
configuration, centered within the right-of-way, curbed and properly drained. The area utilized by any
unpaved island shall not be considered part of the minimum area needed to meet the required
dimensions for the cul-de-sac or right-of-way and shall be governed by the same standards for planted
median islands, as set forth in this article.
(2) Reserved.
(3) Horizontal curvature shall be introduced at any change in road direction, and the minimum centerline
radius shall be 150 feet for local roads and 250 feet for collector roads. based on a maximum superelevation
rate (emax) of 6 percent. For example, the minimum curve radius is 231 feet for collector roads at a 30 -mph
design speed and 485 feet for arterial roads at a 40-mph design speed. The minimum tangent between
reverse curves shall allow the driver to have 6 to 7 seconds of travel time before having to change course
coming out of a curve with normal crown. For example, at a 30-mph design speed, the minimum tangent
length is 300 feet. For reverse curves that are superelevated, tangents shall accommodate superelevation
runoff and tangent runout.Arterial road curvature shall be in accordance with state highway department
standards. Minimum tangent between reverse curves shall be 150 feet for local roads, and 100 feet from
curve to any intersecting road right-of-way.
(4) Stopping sight distance onand vertical curves. Vertical curves, horizontal curves, or normaland
intersections shall allow at least 100 feet ofprovide the minimum stopping sight distance for each ten
miles per hour of the postedthe applicable design speed limit where the road intersects another public
road.
a. . The minimum stopping sight distance and vertical curve K-values shall be measured from a seeing height of
3½ feet, offset 15 feet from edge of road, to an object 4¼ feet in height above based on the grade
ofapplicable AASHTO design criteria. For ease of review, the public road,minimum values are as stated in
SCDOT's 1996 Access and Roadside Management manual. See drawing. follows:
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 7 of 35
b.
Design Speed
(mph)
Minimum Stopping Sight
Distance
Minimum Crest Curve K
Value Minimum Sag Curve K Value
30 200 feet 19 37
35 250 feet 29 49
40 305 feet 44 64
45 360 feet 61 79
50 425 feet 84 96
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 8 of 35
Minimum sight distance at roadway intersections shall provide a clear sight triangle. Sight profiles shall be
provided to ensure proper sight distance. The right-of-way shall be clear of obstacles to enableprovide the
minimum sight distance required, as determined by based on the design speed limit of the road being
accessed increases.intersecting roads and the intersection configuration. The necessary right-of-way in
either direction shall be entered uponincluded in the right-of-way and shown on the final plat prior to
recording. Modifications may be required by the county engineer in order to insure safety.
(5) Intersection skew. Roads shall be designed to intersect as nearly as possible at right angles. In no case shall
the angle of intersection be less than 75 degrees. MinimumThe minimum radius of curb or pavement edge
at intersections shall be at least 20 feet at intersections with local roads and 25 feet at intersections with
collector roads. .
(6) Road Minimum and maximum grades. Roadway centerline grades shall be no less than 0.5 percent and no
greater than 1210 percent. The following shall apply:
Road Classification Maximum Grade
Arterial Roads 48 percent
Collector Roads 610 percent
Local 12 percent
(7) Proposed intersections on one side of a road shall coincide with existing or proposed intersections on
the opposite side. Minimum centerline offset for intersections on the opposite side of a road shall be
150 feet. No two roads may intersect on the same side of a road at a centerline separation distance of
less than 400 feet.
(8) (7) Intersection spacing. Roadway intersection spacing shall meet the requirements set forth in the SCDOT
Access and Roadside Management Standards, 2008 Edition, revised July 8, 2025.
(8) Intersection grades. Intersections shall be designed withat a flat grade whenever practical. When
approaching an intersection in hilly or rolling areas, a leveling area shall be provided having not greater than
a fiveno more than 6 percent grade at a distance of 30 feet, measured from the nearest right-of-way line of
the intersecting street. .
(9) Planted medians. If the developer proposes a roadway with a planted median island, the road right-of-way
shall be divided in half for each half ofincreased to accommodate the road (25 feet each side) with each lane
centered in the right-of-wayincreased width needed. A perpetual maintenance plan and maintenance
agreement shall be submitted to the countyand approved by the County Engineer or designee prior to
construction of saidthe planted median island. the county. The County shall not be responsible for
maintaining any median vegetation. Vegetation within the right -of-way may be removed by the
countyCounty if it presents a safety or visual hazard. All planted medians shall be drained and maintained by
methods submitted by the developer and approved by the county engineer. have sufficient drainage.
(10) All driveway locations must be approved by the county engineer.
(10) Driveways. All proposed driveways shall obtain an encroachment permit. Existing driveways on roads
proposed for County maintenance shall be inventoried and any deficiencies shall be documented on the as -
built plans providing information about the condition, adequate sight distance, dr ainage and location of all
existing driveways.
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 9 of 35
(11) Utilities. When utilizing a County-maintained road right-of-way, all utility lines located outside the
shoulders and ditches shall be buried at a minimum depth of 36 inches. Utility lines located between the
roadway and ditch shall be buried at a minimum depth of 42 inches. Such lines shall be located a minimum
of three feet outside the roadway to protect the roadway and drainage system. No open trench method
shall be used within two feet of the roadway. In order to prevent future road cuts, utility stub-outs shall be
added to all utility lines extending beyond the roadway to each property line.
(12) Submission of road plans. Construction plans for roads shall include accurate topographic information in
contour intervals no more than two feet. In addition, all roadway plans shall note the following items: the
location and dimensions of all drainage features; routes of surface water drainage for the entire project; a
typical cross section of the proposed roadway; road profiles; horizontal and vertical curve designs; right-of-
way dimensions; the location of all cuts and fills; slope steepness; finished grade elevation; all necessary
erosion control practices, which may include but are not limited to, permanent vegetation, lined or piped
ditches or vegetated waterways; and contact information of all interested parties.
(f) Road construction. In general, all public roads shall be constructed in accordance with the SCDOT "Standard
Specifications for Highway Construction" (latest2025 edition) as it relatedthey relate to earthwork,
bases/subbases, paved surfaces, etc. The following requirements shall also apply:
(1) Paved road surfaces are required for all new roads. The county and shall be designed by a professional
engineer licensed in South Carolina. The County Engineer or designee may wavewaive the strict application
of aggregate requirements for hot mixed-mix asphalt pavement withusing materials prepared with stone
from the countyCounty rock quarry. for Type C asphalt mixes.
(2) Reserved.
(3) Reserved.
(4) Collector roads. The minimum base coursepavement section for allcollector roads shall consist of type #1
(550 lbs. per square yard) crushed gravel aggregates compacted on the roadway to a depth of not less than
five8 inches. Compaction of type #1 crusher run base, 2 ½ inches of the aggregate shall comply with the
standards set forth in this article. Type C Intermediate, and 1 ½ inches of Type C Surface or equivalent based
on structural number and pavement design.
(3) Local roads. When hot asphaltic mix will be applied, specifications5) Arterial, industrial, and
commercial roads. The minimum pavement section for set up are same as for the surface treatment.
Asphaltarterial, industrial, and commercial roads shall be applied at noconsist of not less than two-inch
compacted8 inches of type as specified by the county engineer.
(4) Collector roads. Road#1 crusher run base shall include 550 lbs. of stone per square yard (approx. 5)
with two-inch surface course, 3 inches of asphaltic concrete.
(5) Industrial/commercial roads. Road base shall include 650 lbs.Type C Intermediate, and 2 inches of
stone per square yard (approx. 6) with two-inch surface course of asphaltic concrete.
(6) Road paving is required for all new nonresidential subdivisions falling under the jurisdiction of this article.
PavementType C Surface or equivalent based on structural number and p avement design requirements for a
nonresidential subdivision shall be in accordance with sound engineering principles as outlined in
procedures adopted by the American Association of State Highway and Transportation Officials; or the
Portland Cement Institute; or the National Asphalt Institute. All designs shall be subject to review and
approval of the county engineer and the county planning commission. However, in no case shall the paving
standard be less than the standard required for a new residential su bdivision. .
(6) Reserved.
(7) The entire right-of-way area shall be cleared of all stumps, roots, brush, and other objectionable materials
prior to grading roads. All tree stumps and other vegetation shall be removed to a depth of two feet below
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 10 of 35
the sub-gradesubgrade. Rock, when encountered, shall be scarified to a minimum depth of three inches
below sub-gradesubgrade. The entire right-of-way shall be graded. to meet approved plans and
specifications.
(8) All debris and other material deemed unsuitable by the county engineerCounty Engineer or designee shall
be removed before any dirt or soil is placed in fills for the subgrade. Unsuitable materials include any
organic matter, unstable soil, trash, large stones, or other items that prevent the soil from being properly
compacted.
(9) All fill lifts shall be formed by placing and spreading the material in successive, uniform, horizontal layers of
not more than six inches in depth for the full width of the cross section and shall be kept level by the use of
approved equipment. Prior to Before placing each subsequent layer, the compacted layer shall be scarified
before placing fill. The county engineerCounty Engineer or his designated representativedesignee may call
for compaction tests at the completion of any of the six-inch lifts being made. Each level willlift shall be
compacted to a 95 percent proctor. of maximum density.
(10) Suitable material shall be placed in the embankment for the formation, compaction , and shaping of all
embankments, subgrades, shoulders, slopes, intersections, approaches and private entrances to conform to
the typical cross section shown on the approved road construction plan. plans.
(11) When an embankment is to be on a hillside or against an existing embankment sloping more than 20
degrees from the horizontal, the slope of the hillside or existing embankment shall be plowed deeply or cut
into steps before filling is commenced. All embankments shall be formed by placing and spreading the
material in successive, uniform, horizontal layers of not more than six inches in depth for the full width of
the cross section and shall be kept level by the use of approved equipment. Embankments over and around
pipes, culverts, arches, bridges, or other structures shall be constructed of materials approved by the county
engineer. County Engineer or designee.
(12) All pipe culverts shall consist of the following materials:
a. Reinforced concrete conforming to the requirements of American Associati on of State Highway and
Transportation Officials (AASHOAASHTO) M170 Class 3 pipe.
b. High -density polyethylene (HDPE) polypropylene pipe corrugated with a smooth interior pipe
conforming to the requirements of American Association of State Highway Officials (AASHO)
M294MAASHTO M330, Type S pipe.
All pipe culverts shall be of sufficient size to adequately insureensure proper drainage. Calculations by a
professional engineer licensed by the State of South Carolina must be submitted and approved by the
county engineer. Rip-rapCounty Engineer or designee. Riprap shall be securely installed over an approved
silt barrier to the height of the high -water mark around the end of all pipe culverts.
(13) In the event that the engineer, after consultation with appropriate authorities, deems thea crossing of a
watercourse to necessitatenecessitates a bridge, such bridge shall conform to currentthe SCDOT
specifications for steel reinforced concrete bridgesBridge Design Manual (2006 edition) with a driving
surface of at least 24 feet in width. Such bridgesBridges shall be at an elevation as to be approved by the
county engineer. County Engineer or designee. See section 26-3(p)(1).
(14) All drainage inlets and outlets not accessible from the road right-of-way must include a permanent
easement allowing the countyresponsible parties access to the adjacent property needed to perform
necessary maintenance work. Oconee County willshall not be responsible for any damage off of the right-of-
way due to high water or flash flood conditions .
(g) Compaction and testing. Compaction of sub-gradesubgrade and base courses shall conform to the applicable
sections of the latest published edition of the South Carolina Highway Department of Transportation Standard
Specifications for Highway Construction. (2025 edition). Nuclear compaction testtesting may be conducted on
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 11 of 35
all sub-basessubbases as directed by the county engineer.County Engineer or designee. A loaded (minimum of
60,000 lbs. gross weight) tandem truck roll test of the sub-basesubbase shall be performed. Any of the
compactionCompaction tests may be directed by the county engineer or his designated representativeCounty
Engineer or designee during an intermediate six-inch lift. A loaded (minimum of 60,000 lbs. gross weight)
tandem roll test will also be performed upon setupplacement of the base material prior to paving the road. Any
substandard materials will be replaced and retested as directed by the county engineerCounty Engineer or his
designated representative.designee. Upon completion of a road, all fills shall be protected by either seeding or
rip-rapriprap. All fills of 2½:1 or steeper shall be protected by rip-rapriprap or other approved method.
Shoulders and other disturbed soil along the entire cleared area of the right-of-way shall be seeded in such a
manner as to ensure uniform sod.
(h) Inspections.
(1) A developer/owner shall notify the county engineerCounty Engineer or designee at least 48 hours prior to
any requested inspection. Work done prior to inspection is done so at the contractor's and owner's own risk
and may, upon decision of the county engineerCounty Engineer or designee, be required to be removed and
redone or have theits quality substantiated by any tests deemed necessary all, at the contractor's and/or
owner's sole expense. Inspections shall be required for the following:
a. At the completion of clearing and grubbing operations;
b. At the completion of rough grading;
c. At the completion of all utility construction along road right-of-way (including but not limited to water,
sewer, electrical);
d. At the completion of subgrade;
e. After installation and compaction of base course;
f. During all pavement applications; and
g. Final acceptance inspection.
(2) The contractor/owner'sproject engineer retained by the owner or developer shall be present for the
following inspections:
a. Rough grading inspections;
b. Subgrade;
c. Base course inspections; and
d. Final acceptance inspection.
d. The final inspection before a recommendation for acceptance under section 26 -6. A private road
approved under chapter 32 is not accepted automatically into the County road system and, if later
proposed for acceptance, shall undergo the inspection and formal action required by section 26 -6.
(i) Financial responsibility for maintenance. Following acceptance for maintenance by the countyCounty of any
road, the developer/owner shall be financially responsible for all maintenance necessary due to deficiencies
resulting from initial construction for a period of three years. The developer/owner shall post a warranty bond
or a letter of credit for the estimated cost of maintaining the roadto secure that obligation for three years from
the date of acceptance. The county engineer shall determine the amount of thewarranty bond or letter of
credit. The shall equal 15 percent of construction cost and shall be reviewed and approved by the County
Engineer or designee. The warranty bond or letter of credit shall be maintained by the county finance
department. TheCounty Finance Department. The warranty bond or letter of credit shall expire after three years
from the date of acceptance of the road, or in the case of a subdivision road, after a build out of 70 percent of
the subdivision, whichever occurs first.. In order to facilitate the acceptance process, once a road hadhas been
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 12 of 35
substantially completed the developer/owner may request a written punch list from the county
engineer.County Engineer or designee. The punch list will note the items that must be completed prior to
acceptance of the road by the county. County.
(j) Contracts. Not withstandingNotwithstanding any other provision of this section, the owner/developer may
utilize an independent contractor to perform road work. In such case, the owner/developer shall be fully
responsible for work performed by the contractor on said roads.
(k) Financial liability. The owner/developer shall be responsible for all costs in the design and construction of a
road until said road is accepted as a countyCounty-maintained road by the county. County.
(l) Road swales and channels. All roadway ditches and channels shall be designed to contain, at minimum, a peak
flow from a 25-year frequency storm. All roadway ditches and channels shall be designed so that the velocity of
flow expected from a 25-year frequency storm shall not exceed the permissible velocities for the type of lining
used. Rip-rap shall be placed for stops in road drainage swales as instructed by the county engineer. Swales shall
be stabilized against erosion by grassing with a mixture of rye and bermuda grass, or the appropriate grass for
the season. Road swales shall be installed at a maximum depth of three feet and be de signed to enable mowing
by adjoining property owners.
(m) Road maintenance signs. Where subdivision roads are not to be dedicated to the state or county for public
maintenance the subdivider shall install signs that control traffic flow in a safe manner a s specified the
manual of uniform traffic control devices. Also, at the beginning of the private subdivision roads there shall
be signs which state "Private Road" The subdivider may assume the responsibility to install signs provided
the county engineer approves in writing the signage.
(n) Roadside drainage. Roads may be constructed with drainage swales shoulders at a 12:1 slope. Where road
grade exceeds ten percent, curb and gutter, paved drainage swales, or rip rap swales shall be provided. Curb
and gutter may be roll type or standard 90 degrees curb.
(m) Reserved.
(n) Reserved.
(o) Temperature and weather restriction on asphalt paving work.
(1) No hot -mix asphalt surfacing worksurface paving shall be performed on a wet surface, or when the
temperature is below 45 degrees Fahrenheit in the shade and falling, or when weather conditions are
otherwise unfavorable. No proposed County-maintained road shall have surface paving performed between
October 15 and March 15 unless approved in writing by the county engineer, no surface treatment of a road
planned by the owner/developer for acceptance into the county road system shall be begun before March
15 of each year. Unless approved in writing by the county engineer, surface treatment of a r oad planned by
the owner/developer for acceptance into the county road system shall be completed prior to October 15.
County Engineer or designee.
(2) The mixture shall be delivered to the spreader at a temperature between 225°F and 325°F and, except
for sand asphalt mixture for base course construction, within 30°F of the temperature at the plant.
(2) Reserved.
(p) Drainage structures.
(1) Crossline pipes shall be designed to carry runoff from a 25-year, 24-hour design storm and shall be RCP
Class III concrete.. The design shall be determined using runoff data sources and standard methods
approved by the county engineer.in SCDOT Requirements for Hydraulic Design Studies (2009 edition). In no
event shall a pipe less than 18 inches in diameter be accepted by the countyCounty. Crossline pipes or
structures along Waters of the State shall be designed to pass a 100 -year, 24-hour design storm.
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 13 of 35
(2) Concrete Driveway culverts must conform to South Carolina Highway Department of Transportation
requirements. HDPE double Double-wall corrugated high-density polypropylene pipe with a smooth interior
pipe conforming to the requirements of American Association of State Highway Officials (AASHO)
M294MAASHTO M330, Type S pipe or an approved equivalent shall be accepted wh ere sufficient fill over
the pipe is provided. No corrugated metal pipes shall be accepted. No driveway culvert shall be less than 15
inches in diameter.
(3) Unless approved by the county engineerCounty Engineer or designee prior to construction, all pipes shall be
laid in a trench. All trenches shall be excavated so as to allow for safe and proper installation. All backfill
work shall comply with standards specified by the pipe manufacturer; however, in no case shall backfi ll
covering a culvert be less than ten inches deep (pavement and/or base thickness shall not be considered
part of this required minimum depth). All fill shall be compacted to 95 percent of standard proctor test in
the top foot of fill. maximum density.
(4) The jointing of sections of culvert shall be done in a workmanlike manner in accordance with the standard
practice recommended by the manufacturer of the culvert being used.
(5) The ends of all pipe culverts shall be properly protected to prevent pipi ng, erosion and scour. Placement of
filter fabric and rip-rapriprap shall be considered minimum treatment. End treatments shall be approved by
the county engineerCounty Engineer or designee and shown on the plans.
(6) All crossline drainage culverts shall be located in natural drainage areas or depressions, and shall terminate
in a dedicated drainage easement no less than 20 feet wide.
(7) Junction boxes of an approved type will be constructed at all points where the line of pipe changes course
or direction ten degrees or more and at proper intervals along the line of pipe.
(8) A means of access to inlet and outlet points of drainage structures and appurtenances must be provided
and shown on the plans. Oconee County shall not be held liable for flood d amage outside recorded drainage
easements.
(9) Exits for surface water in sideline ditches shall comply with the standards put forth in the following table:
Table—Surface Water Exit Intervals
Road Grade Maximum Exit
Interval
0—2 percent 800 feet
2.1—4 percent 700 feet
4.1—6 percent 600 feet
6.1—8 percent 500 feet
8.1—10 percent 400 feet
10.1—12 percent 300 feet
More than 12 percent 200 feet
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 14 of 35
(10) Exit intervals for surface water along curb and gutter roads, also known as catch basin spacing, shall be
designed to limit the spread to seven feet from the face of curb. The two -year design storm shall be the
basis for determining the stormwater runoff. In no case shall the spacing exceed 800 feet. Special attention
should be usedgiven to designing exits at cul-de-sacs, to prevent overtopping the curb and catch basin.
(q) Sidewalks in County rights-of-way. Sidewalks are only permitted in countyCounty rights-of-way when
they meet the following conditions:
(1) A financially responsible entity, as determined by the countyCounty in its sole discretion (the "responsible
entity"), agrees to perform necessary maintenance and repair to the sidewalk and accepts all real and
potential liability arising from the existence and use of the sidewalk. The responsible entity must, prior to
sidewalk construction, enter into an agreement with the countyCounty that establishes the responsible
entity's maintenance, repair, and liability obligations. These obligations will include the duty to defend and
hold the countyCounty harmless from any damages or claims for damages in any way related to sidewalk
construction, maintenance, and repair.
(2) The sidewalk shall be designed by a professional engineer, licensed in the State of South Carolina, to
meet the most recent applicable South Carolina Department of Transportation ("SCDOT") minimum
standards and be in a form consistent with all applicable SCDOT standard drawings. The sidewalk shall
be constructed in strict compliance with the approved design. Sidewalk design and constru ction must
be timely submitted for approval by appropriate county personnel.
(3) Necessary maintenance and repair of the sidewalk will be performed expeditiously and in a manner
consistent with the most recent applicable SCDOT minimum design standards and standard drawings.
(r) Sidewalks are only permitted in private rights-of-way when they meet the following conditions:
(1) A financially responsible entity, as determined by the county in its sole discretion (the "responsible
entity"), agrees to perform necessary maintenance and repair to the sidewalk and accepts all real and
potential liability arising from the existence and use of the sidewalk.
(2) (2) The sidewalk shall be designed by a professional engineer, licensed in the State of South Carolina, t o
meet the most recent applicable South Carolina Department of Transportation ("SCDOT") minimum
standards and be in a form consistent with all applicable SCDOT standard drawings. The sidewalk shall be
constructed in strict compliance with the approved design. Sidewalk design and construction must be timely
submitted for approval by appropriate countyCounty personnel.
(3) The final plat submitted for approval and recordation must include the following:
"THE SIDEWALK LOCATED IN THE RIGHT-OF-WAY SHOWN ON THIS PLAT SHALL BE PRIVATE, NOT
OWNED, MAINTAINED, OR OVERSEEN BY OCONEE COUNTY, AND NOT CONSTRUCTED PURSUANT TO
ANY PLAN FOR FUTURE ACCEPTANCE BY OCONEE COUNTY. SIDEWALKS IN RIGHTS -OF-WAY SHOWN
UPON THIS PLAT SHALL NOT BE ACCEPTED FOR MAINTENANCE BY OCONEE C OUNTY AT ANY TIME IN
THE FUTURE. MAINTENANCE OF THE SIDEWALK SHALL BE THE RESPONSIBILITY OF _______."
(4) (3) Necessary maintenance and repair of the sidewalk will be performed expeditiously and in a manner
consistent with the most recent applicable SCDOT minimum design standards and standard drawings.
(r) Reserved.
(Ord. No. 2008-19, Art. 3(1—17), 12-16-2008; Ord. No. 2010-17, § 2A, 9-21-2010; Ord. No. 2022-23, §§ A, B, 10-18-
2022)
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 15 of 35
Sec. 26-4. Commercial and industrial roads and streetsReserved.
(a) In addition to residential road requirements set forth, the following standards shall apply to commercial and
industrial roads.
(1) Rights-of-way and road widths. The following right-of-way and road widths are established:
a. Right-of-way: Minimum width is 66 feet.
b. Roadway width: Width is 24 feet with 12-foot lanes plus two-foot valley gutters or six-inch high
curbing and two-foot concrete valley on each side.
(2) Grades.
a. The minimum grade shall not be less than one percent and the maximum shall not be more than
seven percent.
b. All proposed street grades, when intersecting an existing street or highway, shall be constructed
so as to meet the same horizontal grade at the existing intersection and shall have an elevation
for a distance of 30 feet equal to the curb line grade of the existing street to which the proposed
connection is being made. All proposed street connections to existing streets or highways having
existing sidewalks crossing their intersection alignment shall be constructed by removal of the
sidewalk to the new proposed curb radii.
(3) Horizontal (circular) curves. Where a deflection angle of more than five degrees in the alignment of the
street occurs, the right-of-way shall be curved. The minimum horizontal radius of curvature at the
centerline of the proposed street right-of-way shall not be less than 250 feet.
(4) Vertical (crest-sag) curves. Changes in vertical grade shall be connected by vertical curves of minimum
length equal to 25 times the sum of both approaching grades stated in percent of grade. Example: A
five percent slope upward meeting a four percent slope downward requires a curve length of 9 x 25 =
225 feet.
(5) Intersecting roads and road offsets.
a. Intersecting roads. Industrial/commercial roads shall be laid out so as to inter sect as nearly as
possible at right angles and no road shall intersect any other road at an angle less than 80
degrees.
b. Road offsets. Where there is an offset in the alignment of a road across an intersection, the offset
of the centerline shall be not less than 200 feet.
(6) Cul-de-sacs. The circular right-of-way radius shall be 66 feet and paved turning circle with the same
center point and a radius of 50 feet is required.
(7) Temperature and weather restrictions on asphalt paving work.
a. No hot mix surfacing work shall be performed on wet surface, or when the temperature is below
45 degrees Fahrenheit in the shade and falling, or when weather conditions are otherwise
unfavorable. Unless approved in writing by the county engineer, no surface treatmen t of a road
planned by the owner/developer for acceptance into the county road system shall be begun
before March 15 of each year. Unless approved in writing the county engineer, no hot mix
surface treatment of a road planned by the owner/developer for acc eptance into the county road
system shall be done after October 15.
b. The mixture shall be delivered to the spreader at a temperature between 225 degrees Fahrenheit
and 325 degrees Fahrenheit and except for sand asphalt mixture for base course construction,
within 30 degrees Fahrenheit of the temperature at the plant.
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 16 of 35
(Ord. No. 2008-19, Art. 4(1—7), 12-16-2008)
Sec. 26-5. Road upgrades.
(a) Upgrade of existing county roads.
(1) Roads owned and/or maintained by the county shall be listed on a road maintenance plan maintained
by the county road department. Any road not meeting the current standards for public roads as
adopted by the county shall be identified. Those roads that do not meet the current cou nty standards
and are in the primary development areas identified on the county future land use map shall be placed
on the priority upgrade list. A rating system shall be used to prioritize the roads on the priority upgrade
list, with those roads receiving the highest score having the highest priority. Until the county future
land use map is amended in 2009, primary development areas shall include those areas identified in
the comprehensive plan defined as residential areas and transitional growth areas.
(2) Roads on the priority upgrade list shall be upgraded in such a manner as to account for the current and
projected traffic levels. These projections shall be based upon the best information available and
anticipate changes occurring over the next 25-year period.
(3) The following rating factors shall be used in determining the priority upgrade list:
a. Condition and width of driving surface;
b. Existing hazards;
c. Right-of way acquisition; and
d. Current and projected traffic levels.
(4) County roads (whether paved or gravel) that are located outside the primary development areas as
identified in the county future land use map may be placed on the priority upgrade list based on the
recommendation of the county engineer and the agreement of the council's transportation committee.
(5) The county engineer shall review all roads within the county road system on an annual basis and make
recommendations to the county planning commission regarding change s to the priority upgrade list.
The planning commission shall review the priority upgrade list on an annual basis and make
recommendations to county council for changes to the list. The county engineer shall estimate a
projected completion date for all roads on the Priority Upgrade List. The county engineer shall update
the projected completion date on an annual basis. The county engineer shall consider available funding
sources in making these completion projections.
(6) In the event that a developer/subdivider is required to upgrade a county road in the primary
development area, in accordance with section 26-5(b) of this article, the county and the
developer/subdivider shall enter into a reimbursement agreement. The reimbursement agreement
shall allow the developer/subdivider to receive reimbursement for the total cost of upgrading the road
to the minimum county road standard. The cost of upgrading a county road may include the cost of
right-of-way acquisition and the moving of existing utilities. The cost of upgrading the road shall not
include the upgrade of utilities within the road right-of-way. The source for reimbursement shall be
from rollback taxes, if any, and the incremental tax increase of property resulting from New
Development accessed by the upgraded road. The reimbursement agreement shall include not more
than ten percent of any rollback taxes on the property to be developed and such percentage of said
incremental tax increase sufficient to allow the developer/subdivider to receive reimburseme nt for
his/her/its total cost in upgrading the road over a period of time not to exceed ten years from the date
that the county approves the final plat and the plat is recorded. Any reimbursement agreement shall
only include the county portion of any rollback tax or incremental tax increase.
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 17 of 35
(7) A developer/subdivider who is planning a development that will impact a county road in such a way
that the road classification will change, and said road is already scheduled to be upgraded by the
county within the next five years, according to the Priority Upgrade List, may be assigned a higher
priority on the Priority Upgrade List by agreeing to allocate ten percent of the proposed development
for affordable housing or provide the same amount of affordable housing in another location in the
county. Affordable housing provided in this section shall be of the same type of construction (ex. stick
built, modular, etc.) as the new development.
(b) Impact on existing roads system. In order for the county to approve a subdivision site plan, a subdivision plat
or a building permit for a subdivision project, the county road or network of county roads that serve said
proposed development must be adequate to accommodate any increase in traffic resulting from said
proposed development. For all developments consisting of more than ten dwelling units, the
developer/subdivider shall submit a traffic impact/road capacity study demonstrating the impact of traffic
upon any county road servicing the subdivision, either directly or indirectly. The extent of the study shall be
determined by the county engineer on a case by case basis. The traffic impact/road capacity study shall be
reviewed by the county planning director and the county engineer. In the event that the county planning
director and the county engineer determine that the subdivision will increase the average daily traffic (ADT)
on a county road to the extent that said road will need to be upgraded to safely accommodate the increase
in traffic, improvements to the road must be made in accordance with the road classification set forth in the
definitions section of the land development and subdivision regulations ordinance (Ordinance 2008 -20 [as
codfied in chapter 32, article VI, §§ 32-211—32-226]). The developer/subdivider shall be responsible for all
costs (including right-of-way acquisition) necessary to upgrade the road.
(c) Criteria for road improvement projects.
(1) A minimum of 50 feet of right-of-way is required for the entire road.
(2) Utilities must not be located, to the extent practicable, beneath the road surface (excluding sanitary
sewer).
(3) A minimum of 50 feet radius of right-of-way is required for the purpose of constructing an appropriate
turnaround for improvements projects along terminating roads.
(4) Road improvement projects to match existing county standards, to the extent practicable.
The above criteria shall apply to paved and unpaved road improvement projects. From time to time, council may
need to waive the above requirements on a case-by-case basis.
(d) Scoring gravel roads.
(1) A trip generation prediction will be calculated with data collection and other methods outlined by the
Institute of Transportation Engineers.
(2) ADT (Modeled or Measured Average Daily Trips) will be combined with safety Parameters as follows:
Slope or grade X 20 points
Intersection X 20 points
Width X 20 points
No Cul-de-sac X 20 points
Alignment X 20 points
(3) ADT and safety parameters will be the primary factors in scoring gravel roads.
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 18 of 35
(4) For example, if traffic counts were measured to be 480 ADT; and the slope exceeded 12 percent, it was
20 feet, and had no cul-de-sac the score would equal 480 + 60 = 540.
(Ord. No. 2008-19, Art. 5(1—4), 12-16-2008)
Sec. 26-6. Acceptance of roads into county road system.
The following provisions shall apply to the construction of any road intended for future acceptance into the
county road system.
(1) No road shall be accepted by the county for maintenance and incorporated within the county road
system unless the same be shown and delineated upon a plat of survey duly recorded in the office of
the county Register of Deeds.
(2) A construction plan with sufficient detail, including a cross section of the proposed road, shall be
submitted to the county engineer prior to commencement of construction. No construction shall
commence unless the plan has been approved by the county engineer.
(3) A deed granting a right-of-way as specified in this article shall be tendered to the county by the
property owner/developer before a road shall be accepted into the county road system. Upon
acceptance of such deed or right-of-way by the county, the owner/developer shall be notified in
writing of the fact of such acceptance, and the same writing shall constitute an agreement on the part
of the county to maintain and incorporate the said road into its system. The county administrator shall
accept or deny the proffered deed or right-of-way for the county upon receipt of certification by the
county engineer that said road has been constructed in accordance with the regulations set forth in
this article.
(4) Prior to acceptance by the county for maintenance and incorporation within the county road system,
all roads shall meet all road construction standards set forth in this article.
(5(5) The road design shall not result in a lot density below the minimum density requirement.
(6) No road shall be accepted into the county road system until the surface is treated in a manner and
using such materials as approved by the county engineer. The county engineer shall furnish
specification requirements upon request. The county engineer shall be notified by the
developer/owner prior to the commencement of any construction, and shall be given periodic progress
reports and periodic inspection reports as specified by the county engineer. Such progress and
inspection reports are to include notification of the ending and planned commencement of
construction intervals or phases. The county engineer shall certify in writing to county council that the
road to be accepted into the county road system has been constructed in accordance with the
regulations set forth in this article. A copy of the certification shall be sent to the county administrator.
(67) The county may accept a road as a county road through the creation of a special tax district, a
legislatively created administration division of the county whereby resident freeholders fund, thro ugh
the collection of uniform fees included on the annual property tax bill, upgrades to existing private
roads in order for such roads to meet the standards of and for the purpose of acceptance into the
county road system.
(78) No expenditures of any public funds shall be made on any road or right-of-way, which has not been
accepted as a county road.
(89) The roadway must connect to at least one federal, state, county, or municipal roadway.
(910) The county administrator is hereby authorized to accept roads and rights-of-way on behalf of county.
(Ord. No. 2008-19, Art. 6, 12-16-2008)
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 19 of 35
Sec. 26-7. Regulating the use of county roads.
(a) Connection to, or easements or rights-of-way on county roads. Notwithstanding any other provision of this
Code, all connections to county roads, whether temporary or permanent, such as, without limitation,
driveway cuts, logging or construction cuts, roadway intersections, and every other form of connection, must
be approved in writing, in advance of any such connection, temporary or permanent, by the county engineer,
in accordance with subsection 26-3(e)(10) hereof.
The county may only authorize encroachments or grant easements or rights -of-way, for any purpose, on
those county roads for which it owns the right to do so, such as on rights -of-way deeded to the county in fee
simple title. For other roads, such as those for which the county owns less than fee simple title, such as roads for
which the county has only prescriptive easements, the county may only grant encroachments, easements, and
rights-of-way consistent with its interests. Any encroachment, easement or right-of-way granted by the county on
a county road must be approved in writing by the county engineer after making a full investigation of the matter
and considering all factors, including the applicant's needs, as well as the needs of the county, including, without
limitation, good engineering standards, the need to maintain county rights -of-way and keep them open, the
convenience of the traveling public, and other similar professional considerations. If the county engineer approves
such encroachments, easements, or rights-of-way, the easements or rights-of-way may only be granted by county
council, by ordinance, following a public hearing as a conveyance of interests in real property. The county engineer
may approve encroachments properly undertaken in accordance with this chapter.
(b) Work on county right-of-way. Property owners adjoining the county road right-of-way may request that the
county perform work within the right-of-way to install new driveway aprons, mailbox turnouts, and/or
culverts within the county maintained right-of-way. The county, at its sole discretion, may elect to perform
such work on a first pay, first scheduled, time-available basis. If the county performs such work, the property
owner shall pay 2.5 times the material costs to cover the material cost and labor for said project. The
property owner shall sign a hold harmless agreement releasing the county from any liability associated with
said work, in advance of scheduling the project. If the county constructs such driveway aprons, mai lbox
turnout, or culverts within the county right-of-way, such work will be maintained by the county as a part of
the county road system from that point.
The county engineer, or his designee will provide a nonbinding, cost estimate for the material cost o f the
project. Special services or equipment needed to complete the job will be billed as invoiced by the contractor or
vendor providing the special service or equipment.
(c) Drainage.
(1) Property owners adjoining the road right-of-way may request that the county perform work to assist
the property owner with a drainage problem. The county may, at its sole discretion, construct berms,
swales and/or ditches, or install pipe along the county maintained road right-of-way. The property
owner shall pay 2.5 times the material costs to cover the material cost and labor for said project. The
property owner shall sign a hold harmless agreement releasing the county from any liability associated
with future drainage problems, in advance of the county considering and scheduling such project. Such
projects will be scheduled, if at all, on a first pay, first scheduled, time -available basis and will be
maintained by the county, as a part of the county road system from that point.
(2) The county engineer or his designee, will provide a cost estimate for the material costs of the project.
Special services or equipment needed to complete the job will be billed as invoiced by the contractor
or vendor providing the special service or equipment.
(3) The county cannot assist in any drainage matter outside of the road right -of-way, and may only
perform work within the county right-of-way.
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 20 of 35
(4) No property owner or any other person shall modify any drainage in any m anner that affects a county
road without the written approval, in advance, of the county engineer.
(d) Damages.
(1) Any person, entity or utility that engages in an activity which causes damage to a county road or road
structure shall be responsible for repairing said county road or road structure to SCDOT standard
specifications for highway construction. This does not include normal wear and tear to a road caused
by normal use of said road.
(2) Any person driving, operating or moving any vehicle, object or contrivance upon any county road or
road structure shall be liable for any damage which road or structure may sustain as a result of
dragging, scraping, breaking or any other damage done to said road or structure. Any such persons will
also be liable to the county for the cost of such injury or damage.
(e) Encroachment.
(1) All persons desiring to excavate within, encroach upon, or in any way alter a county maintained road
and/or right-of-way, shall notify the county engineer and submit to the county ro ad department an
application for an encroachment permit, together with the required fees and security as determined
and established periodically by county council. Notice will be given by the applicant to the county at
least 48 hours prior to initiating such work, and only after receiving an approved permit from the
county. A schedule of required fees and securities shall be available for review from the county road
department. No person may excavate within, encroach upon, or in any way alter a county maint ained
road or right-of-way without the written approval, in advance, by approved permit, of the county
engineer. In determining whether to approve any such request, and issue a permit, the county
engineer will consider all factors, including the needs of the applicant, as well as the needs of the
county, including, without limitation, good engineering standards, the need to maintain county rights -
of-way and keep them open, the convenience of the traveling public, the applicant's compliance with
previous permits, including temporary permits, and policies of the county, and other similar
professional considerations, including, without limitation, the provisions of the encroachment permit
policy (encroachment permit policy) which is maintained by the Oconee Cou nty Road and Bridges
Department and approved by county council from time to time and is included herein by reference.
The county engineer may impose restrictions on any granted approval and permit under this section,
consistent with such professional considerations; including, without limitation, up to and including
temporary suspension or permanent revocation of such permit, for failure to comply with the permit
terms or these policies. Any appeal from any decision of the county engineer under this section will be
treated as a request for a variance from road standards and handled in accordance with the
procedures of section 26-8 of this Code.
Oconee County Council shall, from time to time, approve the county's encroachment permit policy,
including, without limitation, the policy itself, as well as the encroachment permit application form,
and the schedule of fees for the application of the policy. The initial encroachment permit policy,
encroachment permit application form, and fee schedule are attached as exhibits to this section, and
are hereby approved. For minor nonsubstantive revisions, the county, acting by and through the
county council, may revise the policy, application form, or fees, as it desires, in the future by simple
resolution of county council, and may include the fees schedule in the schedule of departmental fees
that is contained in a proviso in the annual county budget ordinance. More substantial, and all
substantive revisions to policy, application form, and fees must be revised by count y council ordinance,
including, without limitation, the annual county budget ordinance.
(2) Upon completing the permitted activity, the applicant shall restore the county maintained road and/or
right-of-way to its original condition (except for any permanent alteration approved by county permit,
and through a county-granted right-of-way or easement), insuring that all repairs conform to the
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 21 of 35
requirements contained in the SCDOT standard specifications for highway construction and the
encroachment permit policy. Eighteen months after the permitted activity is satisfactorily completed,
the security shall be returned to the applicant provided the county engineer, upon final inspection,
approves the repair. If the county engineer deems the repair to be unacceptab le, the security shall be
retained by the county and used to properly repair and restore the road and/or right -of-way to its
original condition. Once the road and/or right-of-way has been properly repaired, any excess security
will be returned to the applicant, it being understood that, in one form or another, all costs of
encroachment upon, or any alteration of a county maintained road or right -of-way shall be borne by
the applicant.
(3) Driveway aprons and mailbox turnouts abutting county maintained road s are encroachments, subject
to the provisions of this section, and will be the responsibility of the property owner, as to construction
and maintenance, subject to the provisions of subsection 26-7(b), and subject to the caveat that if the
county constructs or manages a road project, driveway aprons and mailbox turnouts may be part of the
project, subject to the terms of such subsection 26-7(b).
(4) Violation of the encroachment permit policy is a violation of this Code and is punishable by civil fine of
$500.00/day/violation. Each and every day of a continuing violation shall be deemed a new and
separate offense. Failure to pay any civil fine levied hereunder shall constitute a violation of this Code
and shall be punished in accordance with section 1-7, hereof.
(f) Road safety.
(1) All persons shall park vehicles and equipment at least three feet from the edge of the driving surface
on all roads. Parked vehicles and equipment shall not block ditches and swales or in any way inhibit
drainage.
(2) No person shall place any type of material within three feet of the driving surface.
(3) No person shall place a sign on a road in the county that will restrict visibility or inhibit sight lines of
drivers.
(4) Signs (other than these regulated by state or federal law, such as political signs) remaining in place for
more than seven days on county roads, will require an encroachment permit from the county road
department.
(g) Inspections. A developer/owner or any other affected entity shall notify the county engi neer at least 48
hours prior to any requested inspection required by this chapter for public or private roads. Inspection fees,
for such inspections, shall be established by resolution, ordinance or other official act of county council from
time to time, and must be paid, in full, before the county will finally accept the road(s) in question. All such
fees, once paid, shall be maintained by the county in a separate account used only for the road inspection
program of the county, and will only be in such amount(s) as will be sufficient to maintain such program.
Work done prior to inspection is done at the contractor's and owner's own risk and may, upon decision of
the county engineer or designee, be required to be removed and redone or have the quality substa ntiated by
any tests deemed necessary, all at the contractor's and/or owner's sole expense. Inspections shall be
required for the following:
(1) At the completion of clearing and grubbing operations;
(2) At the completion of rough grading;
(3) At the completion of all utility construction along road right-of-way (including but not limited to water,
sewer, electrical);
(4) At the completion of subgrade;
(5) After installation and compaction of base course;
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 22 of 35
(6) During all pavement applications; and
(7) At final acceptance inspection.
(h) Penalties. Failure to comply with any of the requirements of this article constitutes a misdemeanor and shall
be punishable as set forth in section 1-7. In addition, in the event that the county must file a civil suit in order
to enforce its rights under this article, the county shall be entitled to reasonable attorney's fees.
(Ord. No. 2008-19, Art. 7(1—5), 12-16-2008; Ord. No. 2010-17, § 2B, 9-21-2010; Ord. No. 2013-16, § 2B, 7-16-2013)
Editor's note(s)—The Oconee County Roads and Bridges Department Encroachment Permit Application and Policy
are incorporated herein by reference as if fully set out at length. A copy is on file and available for inspection
at the offices of the county.
Sec. 26-8. Variance from road standardsReserved.
(a) Any variance from these road standards shall be consistent with the intent of this article, and shall be
approved in writing by the board of zoning appeals. Any person or entity requesting a variance from road
standards shall submit a written request for a variance to the planning director of the county. A variance can
only be granted for actions to take place in the future. No variance may be granted for past actions.
(b) Prior to scheduling a variance hearing before the board of zoning appeals, the perso n or entity requesting
said variance shall work with the county planning department and the county road department in an effort
to eliminate or minimize the need for a variance. After reasonable efforts and no other solution can be
reached, a hearing shall be scheduled before the board of zoning appeals. The county staff shall submit
written reports to the board of zoning appeals setting forth the county regulation in question, the efforts
made to remedy the situation, and a recommendation setting forth the county's position regarding the
variance. These written reports shall be submitted to the person or entity requesting the variance at least
five days before the variance hearing.
(c) Notice of the variance hearing shall be provided by first-class mail to the person or entity requesting the
variance at least 15 days prior to the hearing. Notice of the hearing shall also be published in a newspaper of
general circulation in the county at least 15 days before the hearing.
(d) Any party may be represented by counsel. Any person or entity that would be directly impacted by the
granting or denial of the variance may participate as a party in the hearing, provided notice of intent is
submitted in writing to planning department at least seven days prior to the he aring. The planning
department shall immediately notify all other parties of the new party's participation. The county may
support or oppose the variance request or be neutral.
(e) The board shall make the initial determination concerning the variance req uest and may consider any and all
evidence it deems relevant concerning the variance issue. The paramount issue for all variance requests shall
be the reasonable safety of the road under the proposed circumstances. If the board concludes that a safe
road can be constructed without strict application of the regulations set forth in this article or other county
ordinances and policies, the board may then consider issues such as the cost of right -of-way acquisition,
placement of utilities, and unusual circumstances in determining whether to grant a variance. The board
should use reasonable discretion in its decision making.
(f) A person or entity whose request for a variance has been denied by the board may appeal the board's
decision to the transportation committee of the county council.
(Ord. No. 2008-19, Art. 8, 12-16-2008)
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 23 of 35
Sec. 26-9. Road closure and abandonment.
(a) Prior to any request for abandonment and closure of an Oconee County public road being brought before
county council, county staff, including, without limitation, the Oconee County Roads and Bridges
Department, will conduct a thorough investigation, adequa te to determine: whether the road in question is,
or ever has been, a county road; whether the road still is a county road; whether the road is still in general
public use or has been practically abandoned; whether the county has any documentation relating to the
status of the road, such as a dedication of right-of-way or easement, or a deed, or whether such road was
subject to a prescriptive easement or easement by usage; whether there is any other information which
would assist county council in determining whether the best interests of the Oconee County public will be
served by consenting to the abandonment and closure of the road in question or by not so consenting. As a
part of the investigatory process addressed herein, the Oconee County Roads and Brid ges Department will
post, adjacent to the road in question, a sign, marked so as to be as conspicuous as possible, prominently
providing notice that the road, or portion thereof abutting the sign, is proposed for abandonment and
closure, soliciting citizen comments concerning such proposed abandonment and closure, and providing
notice of address and telephone number at the Oconee County Public Works Department to which
concerned citizens may forward comments concerning such proposed abandonment and closure.
(b) Following the investigation referred to in paragraph 1, supra, county staff will make a recommendation to
the Transportation Committee of Oconee County Council, which, in turn, will make a recommendation to
Oconee County Council as to whether the request for abandonment and closure should be honored or not,
and provide the results of the staff investigation to county council for its use and final determination
whether the county will consent to such abandonment and closure. Included with the recommend ation will
be any public comments received and the recommendation(s) of county staff and the transportation
committee.
(c) County council shall then, in public meeting, make a determination as to whether the request for
abandonment and closure should be consented to by the County, acting by and through county council, and
shall signify its decision by motion, if such decision be negative, and shall signify its decision by resolution of
county council, if such decision be positive.
(d) If county council consents to the abandonment and closure of a county public road, as addressed herein, the
resolution of county council consenting to such abandonment and closure shall state, with particularity, the
road, or section thereof, to be closed; the basis for count y council's decision to consent to the abandonment
and closure of the road; and the absolute requirement that, prior to the road, or portion thereof, in question
being closed, the primary private party(ies) in interest (unless the county, itself, is the pa rty requesting the
road closure, in which case the county will be the primary party in interest to comply with this section) shall
fully comply with all applicable law, including, without limitation, S.C. Code 1976, § 57 -9-10, as amended, and
shall provide all required notice and service of process. Only upon the meeting of such conditions and the
fulfillment of such procedures will the county council consent to such abandonment and closure be
considered final, and that shall be stated in such resolution.
(Ord. No. 2010-28, §§ 1—5, 10-19-2010)
Sec. 26-10. Legal provisions.
(a) These regulations expressed in this article shall be considered as the minimum provisions for the protection
of the health, safety, economy, good order, appearance, convenience, and welfare of the general public.
(b) Conflict with other laws, ordinances, or regulations. Whenever the requirements made under authority of
these regulations impose higher standards than are required in any statute or local ordinance or regulation,
provisions of these regulations shall govern. Whenever the provisions of any othe r statute or local ordinance
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 24 of 35
or regulation impose higher standards than are required by these regulations, the provisions of such statute
or local ordinance or regulations shall apply.
(Ord. No. 2008-19, Art. 9(16.1, 16.2), 12-16-2008; Ord. No. 2010-28, § 5, 10-19-2010)
Sec. 26-11. Identify roads in the county road system.
(a) Purpose. The purpose of this section is to establish the criteria, method and means of identification of all
roads making up and comprising the Oconee County (the "county") road and highway system (the "county
road system") and to discontinue from the county road system those streets, roads and highwa ys found by
the county to be useless and unnecessary for the convenience and necessity of the general public. Nothing
herein shall be deemed to amend, alter, or revoke, in any regard section 26 -6 of the Oconee County Code of
Ordinances (the "Code of Ordinances"), relating to the acceptance of roads into the county road system, nor
any other section of chapter 26 of the Code of Ordinances, except as explicitly addressed herein.
(b) Oconee County road map. The county department that currently maintains the Geographic Information
System (the "GIS") of the county shall maintain in its office a map of the county and such other records as
may be deemed necessary or convenient showing the location and number of each roadway within the
county which is a part of the county road system (the "county map"). On the direction of the Oconee County
Council, in accordance with policy established by the Oconee County Council and actions of the Oconee
County Council, the public works director shall request the county departmen t that maintains the GIS to
make such additions and deletions of road and highway sections upon such county map, as may be necessary
to keep such county map current as conclusive evidence of the existence of a county road or highway. The
public works director shall review such additions and deletions of road and highway sections, made through
the GIS, to such county map for accuracy and shall inform the county administrator that such county map has
been updated appropriately. At such time, the county administrator shall inform the county council that such
county map has been updated as directed by county council. Where practical, written rights -of-way shall be
obtained on roads and highways maintained by the county. Provided, however, recognizing that many
roadways presently a part of the county road system have been acquired by prescriptive right or use, written
easements or deeds of right-of-way shall not be necessary to conclusively establish the existence of a county
road. All newly-constructed county roads, including subdivision roads, shall become a part of the county road
system only in accordance with section 26-6, hereof, and only when granted by written instrument, either by
deed or dedication on plats of subdivisions duly filed in the office of the clerk of court which are formally
accepted by the administrator of the county, pursuant to policy established by the Oconee County Council.
Notwithstanding any other provision of this section, it shall not be necessary to notify the Oconee County
Council when merely the name of an existing county road or highway section, which is currently included in the
county road system, as evidenced by the inclusion of the road or highway section in the county map, is changed on
the county map in accordance with existing county policy and procedures, to keep such county map current.
(c) Findings of fact. The Oconee County Council, by this section, declares the following findings of fact:
(1) An attempt has been made and will continue to be made to identify all roadwa ys located in the county
which are useful and necessary for the traveling public and have been designated and treated by the
county as county roads; and
(2) Such roadways have been maintained by the county since at least January 1, 1981, or have been
dedicated to and accepted by the county in accordance with then-current county policies as county
roads; and
(3) There exist many roadways which were formerly maintained by the county, upon which maintenance is
no longer required by reason of disuse or which were maintained by the county under circumstances
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 25 of 35
possibly contrary to the statutory law of this state, none of which have ever been accepted by the
county as county roads or designated as such in accordance with then -current county policies.
(d) Official roads; discontinuance of all other roads as Oconee County roads. Based upon the continuing findings
of fact of the Oconee County Council set out by subsection (c) hereof, the official road and highway system of
Oconee County shall include only the following roads as Oconee County roads:
(1) Those unpaved roads or highways continuously maintained by county equipment as duly authorized by
the administrator (or his/her predecessor) of the county since January 1, 1981, and thereafter, and
treated as and called county roads; and
(2) Those roadways, streets or highways accepted into the county road system since January 1, 1981, by
reason of and in accordance with the provisions of the Code of Ordinances pertaining to non -
subdivision roads, including newly-constructed roads, and subdivision roads; and
(3) All paved or asphalted roads running in and through the county other than roads and highways of the
state and federal highway systems, and roads designated on the county records as "private roads",
upon receipt of evidence satisfactory to the county administrator and public works director that such
road(s) are, in fact, public roads of the county, including, without limitation, through proof of
dedication to public use and acceptance by the county, or by proof o f continuous use and maintenance
as public roads by the county for the period of time as statutorily required by Section 15 -67-210, et
seq., of the Code of Laws of South Carolina, 1976, or successor legislation, as amended, to establish
adverse possession, or other good and sufficient proof; provided, however, any portion of a paved road
which has been barricaded or blocked because of the construction of Lakes Keowee, Hartwell or
Jocassee shall not be considered part of the county road system from the point of the blockade and
shall not be maintained by the county. Upon the identification of any such "orphaned" sections of
roads which were previously county roads, actions shall be initiated by the county pursuant to Section
57-9-10, et seq., of the Code of Laws of South Carolina, 1976, as amended, to make such orphaned
parts be judicially closed and abandoned and title thereto vested as dedicated by the courts.
Notwithstanding any other provision of this section and upon recommendation of the administrator o r
the Oconee County Council, on a case-by-case, specific basis, and only for good and sufficient cause
shown, of record, any other road may be declared by the Oconee County Council to be a part of the
county road system.
No other roads are part of the county road system, nor shall they be part of the county road system
without dedication to public use and acceptance by the county in strict accord with the Code of
Ordinances. Only roads that are part of the county road system in accordance with this section shall be
reflected on the county map as county roads.
(e) Status of abandoned state highways and roads within municipalities. Notwithstanding the provisions of
Section 57-5-120 of the Code of Laws of South Carolina, 1976, as amended, any section of the state highway
system so abandoned outside the limits of any municipality located in the county shall not become a part of
the county road system unless specifically accepted by the county as a county road or highway and the
abandonment of such road or highway by the State of South Carolina shall be prima facie evidence that the
same is useless and not necessary or convenient for us e by the public of the county. By appropriate action,
however, the county may accept and incorporate any such abandoned roadway into its county road system,
at the Oconee County Council's sole discretion, and in accordance with this chapter.
In the event a county municipality's boundaries are expanded, through annexation or other such action, and
such expanded boundaries then encompass or include any part of a road that has previously been maintained by
the county and incorporated as a county road into the county road system, as evidenced by such road's inclusion in
the county map, the municipality whose expanded boundaries then encompass such road portion shall be solely
and exclusively responsible for all maintenance, of whatever kind, of such road portio n in accordance with Section
5-27-110 et seq., of the Code of Laws of South Carolina, 1976, as amended. Such road portion, only (not the
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 26 of 35
remainder of the road which is not annexed), shall be removed from the county road system and the county map,
in accordance with the guidelines and procedures set forth in this chapter, and such road portion shall henceforth
be a road of that municipality and shall no longer be a county road.
(Ord. No. 83-7, §§ I—V, 8-16-1983; Ord. No. 2013-08, § 2(Exh. A), 1-21-2014)
Sec. 26-12. Acceptance of certain unpaved roads.
(a) Rudimentary roads. There is hereby established a class of public roads to be known as "rudimentary roads."
(b) Rudimentary road program. There is hereby established a rudimentary road program (the "program") by
which the county may receive and accept a limited number of su bstandard roads into the county public road
system for minimal upgrade and minimal maintenance as rudimentary roads.
(c) Criteria for substandard roads to be accepted into the program. In order for a substandard road to be
accepted into the program it must meet the following criteria:
(1) The road must serve 11 or more occupied residences.
(2) The road must be unpaved and in a state of severe disrepair, such that it may be impassable by
emergency vehicles or otherwise dangerous.
(3) The county must be deeded a 50-foot right-of-way easement, with language acceptable to the county,
to carry out all tasks necessary herein for the length of the road to be accepted by the county. The road
must be centered within the deeded right-of-way.
(4) The road must have a cul-de-sac at its termination point, if any.
(5) All property owners adjacent to, and served by, the road must agree to remove any structures,
improvements, debris, etc. that exist within the right-of-way.
(6) All property owners adjacent to, and served by, the road must agree to accept the conditions and
results of limited upgrade and maintenance, as well as resulting stormwater runoff.
(7) All property owners adjacent to, and served by, the road must agree that use of the road by the
general public will be unrestricted.
(8) All property owners adjacent to, and served by, the road must agree to release, indemnify, and hold
the county harmless from any claims or damages arising, or alleged to have arisen, from or in any way
related to the program established hereby.
(9) The road shall be subject to an emergency service access review.
(d) Petition for acceptance into the program.
(1) The county's roads and bridges department shall establish a petition containing the elements outlined
in subsection (c) above, to be completed and submitted by the community requesting acceptance of a
substandard road into the program. The petitioning community is solely responsible for all costs
associated with compiling a complete petition, including but not limited to costs related to any
necessary investigations, surveys, agreements, deeds and/or rights -of-way.
(2) The county engineer shall review the petition and provide a "staff report" determining whether the
petition is complete.
(3) Complete petitions, along with the staff report, shall be submitted to the transportation committee of
the county council, which in turn will provide the staff report to the county council, making a
recommendation as to whether the petition for acceptance into the program should be accepted or
not. Included with the recommendation will be any public comments received. The county council shall
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 27 of 35
then, in public meeting, make a determination as to whether the petition for acceptance into the
program should be approved by the county or not. If the county council approves the petition, it shall
signify so by resolution.
(e) Minimal upgrading and maintenance standards established for rudimentary roads. Once accepted into the
program, the subject road will be minimally upgraded and maintained as follows:
(1) The road shall be upgraded to a width of 20 feet and be centered in the 50 -foot right-of-way.
(2) The road's center line's vertical and horizontal alignment shall remain in roughly the same orientation
as its pre-existing condition.
(3) The road surface shall be upgraded to a minimum thickness of six -inch compacted stone. It shall not be
paved.
(4) The shoulders of the road shall extend four feet from the road surface.
(5) From the edge of the shoulders there shall exist, or be constructed, 18 -inch deep ditches, with a
minimum 2:1 slope.
(6) There shall exist or be constructed tail ditches at frequent intervals (e.g., ev ery 400 feet).
(7) Any existing drainage pipes shall be extended to accommodate the new road width.
(8) If the road terminates, as opposed to intersects with another public road, a cul -de-sac with an 80-foot
diameter shall be constructed. In this case, a deeded right-of-way of 100 feet shall also be required for
the subject area.
(9) No maintenance of storm drains, pipes, ditches, culverts, catch basins, etc. will be performed by the
county.
(10) Maintenance (limited to blading and stone replacement) shall be on an as needed basis but not to
exceed one time per calendar year, barring the need for emergency-related work as determined by the
roads and bridges department.
(11) Any upgrades occurring after the initial minimal upgrades performed by the count y must meet current
county standards for public roads (thus removing the subject road from the rudimentary road class) be
approved by the county in writing, and be paid for by the residents.
(f) Relation to other ordinances, resolutions or other enactments.
(1) As the provisions of this section create a distinct program by which the county may receive and accept
a limited number of substandard roads into the county public road system for minimal upgrade and
minimal maintenance as rudimentary roads, this section does not operate to repeal or rescind any
existing ordinances, resolutions, or other enactments of the county to the extent there exist any
conflicts herewith. Nonetheless, any such conflicts do not operate to preclude the effect of the
provisions contained herein.
(2) To the extent any ordinance, resolution, or other enactment of the county does not conflict with the
provisions and intent of this section, such ordinance, resolution, or other enactment applies here with
equal force.
(g) Miscellaneous.
(1) Rudimentary roads shall not be eligible for improvements as contemplated by section 26 -5.
(2) Subdivisions will not be permitted/allowed along rudimentary roads.
(3) Additional ingress/egress encroachments along rudimentary roads are prohibited.
Created: 2026-05-07 10:21:26 [EST]
(Supp. No. 55)
Page 28 of 35
(4) Rudimentary roads are subject to such other limitations and restrictions as the county administrator, in
his or her sole discretion, shall deem necessary for carrying out the intent of this section while not
otherwise impacting the integrity or purposes of the county public road system.
(5) Operation of the program may be significantly limited or completely suspended based on existing
budgetary constraints.
(Ord. No. 2016-16, §§ 1—7, 6-7-2016)
Secs. 26-13—26-100. Reserved.
ARTICLE II. ROAD NAMING AND ADDRESSING
Sec. 26-101. Name.
The name of this article shall be the "Oconee County Road Naming and Addressing Ordinance".
(Ord. No. 2007-10, § 1, 7-17-2007)
Sec. 26-102. Purpose and intent.
It is the purpose of this article to enhance efficient emergency response and further the orderly development
of the county by establishing standards for the naming of roads and assigning addresses to structures, and to
provide for the creation of office policies and procedures to assist the staff in implementing these standards.
(Ord. No. 2007-10, § 2, 7-17-2007)
Sec. 26-103. Authority.
This article is adopted pursuant to provisions of S.C. Code 1976 Title 23, Chapter 47; and Title 6, Chapter 29.
(Ord. No. 2007-10, § 3, 7-17-2007)
Sec. 26-104. Jurisdiction.
This article shall apply to all areas within the boundaries of the county that are designated by the State of
South Carolina to be the responsibility of the county in the naming of roads and addressing.
(Ord. No. 2007-10, § 4, 7-17-2007)
Sec. 26-105. Finding of facts.
The county council hereby establishes and adopts the following standards to regulate the assignment of road
names and addresses, and to establish penalties such as are necessary to discourage activities that impair effective
implementation of this article.
(Ord. No. 2007-10, § 6, 7-17-2007)
Created: 2026-05-07 10:21:27 [EST]
(Supp. No. 55)
Page 29 of 35
Sec. 26-106. Road naming.
(a) The county planning commission shall approve and authorize road nam es pursuant to S.C. Code 1976 § 6-29-
1200 and § 23-47-60. To this end, the planning commission may establish policies and procedures as
necessary to enable staff to carry out this directive in the most efficient and equitable manner possible.
(b) All policies and procedures governing road naming shall be contained in a public document entitled, "Oconee
County Road Naming and Addressing Policies", which may be amended by the county planning commission
from time to time as necessary.
(c) The county planning commission shall maintain a master list of a road names assigned in the county.
(d) Appropriate fees may be established by resolution of county council from time to time to cover costs related
to road naming.
(Ord. No. 2007-10, § 6, 7-17-2007)
Sec. 26-107. Road signage.
(a) All road signage shall meet the standards put forth in the Federal Highway Administration's Manual of
Uniform Traffic Control Devices, and policies outlined in the "Oconee County Road Naming and Addressing
Policies."
(b) Appropriate fees may be established by resolution, ordinance or other official act of county council from
time to time to cover costs related to road signage.
(c) All costs associated with the installation of signage in a new subdivision shall be borne by the
developer/owner.
(d) All costs associated with changing signage on an existing road for nonemergency related reasons shall be
paid by the party initiating the change.
(e) Property owners' associations ("POAs") and homeowners' associations ("HOAs") which are properly
organized as legal entities and insured to the satisfaction of county council, and which satisfactorily
demonstrate to county council the financial ability to do so, may request the county, acting by and through
the county council, to enter into a legally binding agreement with such POA/HOA authorizing the POA/HOA
to maintain road signage within its respective community, sub ject to: agreeing to indemnify the county and
hold the county harmless as to all harm, damages, or liability which might occur because of the POA/HOA's
maintenance of such signage; compliance with subsection 26-107(a) hereof; complete payment by the
POA/HOA of all costs of any type associated with maintaining such signage; and maintenance by the
POA/HOA of adequate insurance, naming the county as an additional insured, to fulfill its obligations
hereunder and thereunder. If the POA/HOA meets all conditions of this subsection, it may utilize signage of
its own design and choosing, consistent with county roads and bridges department policies as to sign
background color, lettering style, and inclusion of road number designation on street name signage, to the
satisfaction of county council, in that respective community.
(Ord. No. 2007-10, § 7, 7-17-2007; Ord. No. 2010-17, § 2C, 9-21-2010; Ord. No. 2012-21, § 2, 7-17-2012)
Sec. 26-108. Addressing and numbering.
(a) A uniform system of assigning address numbers for properties, principal buildings, and other structures shall
be implemented in conformance to S.C. Code 1976 § 23-47-60.
Created: 2026-05-07 10:21:27 [EST]
(Supp. No. 55)
Page 30 of 35
(b) All addresses assigned after the adoption of these standards shall be unique within the jurisdiction of these
regulations, and comply with the standards put forth in the "Oconee County's Road Naming and Addressing
Policy."
(c) Addresses existing at the time of the adoption of these standards may be changed as necessary to provide
for an efficient emergency response, and to accomplish the purpose and intent of state regulations and this
article. Any address found to present a potential threat to the health; safety and welfare of the public shall
be changed as soon as is practicable.
(d) Written notification of assigned addresses shall be provided to the owner, occupant, or agent of each
building in all instances of new or changed addresses.
(e) Assigned addresses shall be displayed in such a manner as to meet all applicable state and local standards.
(Ord. No. 2007-10, § 8, 7-17-2007)
Sec. 26-109. Appeals.
Appeals to a decision made by the county addressing staff must be submitted in writing to the planning
director, and must indicate the specific reason for the appeal. The planning director shall forward all appeals t o the
planning commission, who shall act on the appeal pursuant to the standards established in S.C. Code 1976, Title 6,
Chapter 29.
(Ord. No. 2007-10, § 9, 7-17-2007)
Sec. 26-110. Administration and implementation.
The county addressing office shall assign all addresses issued in the county pursuant to state regulations and
the standards contained in this article. The addressing office shall be the sole party authorized to issue addresses
within the jurisdiction of this article.
Every owner, agent, or other responsible party of each house, building or other addressed structure shall
display the correct address in such a manner as is necessary to meet the standards put forth in this article. Specific
guidelines related to displaying addresses shall be available from the addressing office.
(Ord. No. 2007-10, § 10, 7-17-2007)
Sec. 26-111. Enforcement.
No building permit, land use permit, or other county-sanctioned authorization shall be issued for any
building, structure, development or other usage until appropriate addresses have been assigned.
Final approval of any structure erected, repaired, altered, or modified after the effective date of this article
shall be withheld by the building official until such time as the appropriate address has been properly posted.
Failure to post and maintain appropriate signage or addressing as required by thi s article shall be considered
a violation of these regulations, and may subject the owner, agent or responsible party to all penalties proscribed
herein.
(Ord. No. 2007-10, § 11, 7-17-2007)
Created: 2026-05-07 10:21:27 [EST]
(Supp. No. 55)
Page 31 of 35
Sec. 26-112. Violations and penalties.
(a) Failure obtain or to post addresses. Failure by an owner, agent, or responsible party to obtain an appropriate
E-911 address, or to knowingly place an incorrect address in such a manner other than is provided for by this
article, shall constitute a violation of this article. The owner, agent, or responsible party shall be deemed
guilty of a misdemeanor and, upon conviction, shall be fined not more than $50.00 dollars or imprisoned for
a term not to exceed 30 days. Each day that the said violation continues to exist, shall constitute a separat e
offense.
(b) Tampering with street signs, posting illegal street. Removing or defacing a street name sign in any manner,
placing a street name sign in any location not approved for such by the county roads department, or being
found in possession of a stolen street sign shall constitute a violation of this article. Any person found in
violation shall pay all cost associated with the replacement or repair of the signs, and shall be deemed guilty
of a misdemeanor and, upon conviction, shall be fined not less than $250.00 dollars per offense or
imprisoned for a term not to exceed the authority of the magistrate's courts.
(c) Removing or defacing numbers. Any person who unlawfully removes, defaces, marks, changes, destroys or
renders an existing posted address number, or road number unreadable in any manner shall be deemed
guilty of a misdemeanor and, upon conviction, shall be fined or imprisoned for a ter m not to exceed the
authority of the magistrate's court.
(Ord. No. 2007-10, § 12, 7-17-2007)
Secs. 26-113—26-150. Reserved.
ARTICLE III. A PROGRAM TO DESIGNATE OCONEE COUNTY'S SCENIC HIGHWAYS;
ESTABLISHED3
Sec. 26-151. Oconee County scenic highways.
Highways located within Oconee County, South Carolina and found to be of special value to the citizens may
be designated as scenic highways pursuant to the rules, regulations, and criteria set forth below.
(Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025)
Sec. 26-152. Definitions.
The following words, terms and phrases, when used in this article shall have the meanings ascribed to them
in this section, except where the context clearly indicates a different meaning:
Highway means all those roads, streets and highways within the federal, state or Oconee County highway
system.
3Editor's note(s)—Ord. No. 2017-22, § 1(Exh. A), adopted Sept. 19, 2017, amended art. III in its entirety to read as
herein set out. Former art. III, §§ 26-151—26-157, pertained to similar subject matter, and derived from Ord.
No. 2007-21, §§ I—V, App. A, App. B, adopted Oct. 21, 2008.
Created: 2026-05-07 10:21:27 [EST]
(Supp. No. 55)
Page 32 of 35
Intrinsic qualities means those significant tangible and intangible resources found within a scenic corridor that are
known to be distinct within the region. "Intrinsic qualities" include:
(1) Scenic: The composition of features that are regionally representative, associative or inspirational.
These features are memorable, distinct, visually impressive, and continuous across the view.
(2) Historic: Landscapes and structures that educate and stir an appreciation for the legacy of Oconee
County's past.
(3) Cultural: Activities or objects that represent unique and distinctive expressions of community life,
customs or traditional ways and identify a place, region or culture.
(4) Recreational: Passive and active leisure activities directly dependent on the scenic qualities of the area
and usually associated with outdoor recreation as we seek to refresh and renew our spirits.
(5) Natural: Relatively undisturbed and visually pleasing natural areas and/or ecologically sensitive
landscapes representing natural occurrences including landforms, water, vegetation and wildlife
characteristics.
(6) Archaeological: Sites, artifacts or structures recognized by the scientific or academic communities as
being representative of past human life and activities.
Scenic highway means a highway or segment of a highway receiving a designation as such pursuant to the
provisions contained in this article and based on it deserving such recognition due to scenic vistas, cultural or
historical significance, or other criteria specified by county council. All scenic highways shall be divided into two
route categories:
(1) Highways with limited development visible from the highway, yet still retaining special characteristics
worthy of preservation, shall be designated a category I scenic highway.
(2) Highways with little or no development visible from the highway lying outside primary growth areas,
shall be designated a category II scenic highway.
(Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025)
Sec. 26-153. Designation process.
(a) Applications shall be submitted in writing to the planning department by a sponsoring organization (see
section 25-154(B)), or by a property owner or group of property owners whose property is contiguous to the
proposed scenic highway. Applications shall contain the contact information of person designated by the
submitting group as the primary contact for purposes of the designation process and subsequent regulatory
and related activities if the proposed highway receives the scenic designation.
(b) All persons or entities owning property that is contiguous to the right -of-way of the proposed scenic highway
must sign the application for designation as a scenic highway.
(c) Upon receipt of an application for the designation of a highway as a scenic hi ghway, the planning director, or
their designee, shall forward the application to the staff liaison for the planning commission, who shall then
place review of the application on the next appropriate planning commission agenda for consideration.
Notice of the date, time, and nature of the planning commission's meeting to consider the application for
designation as a scenic highway shall be published in a newspaper of general circulation in the county at least 15
days prior to the meeting. Additionally, signs measuring at least nine square feet and noting that consideration of
an application for designation of the subject highway as a scenic highway, and containing contact information for
the planning commission's staff liaison, shall be posted at the beginning and end of the proposed scenic highway
and at increments of no less than one mile along the length of the proposed scenic highway. These signs shall
remain in place until county council takes final action on the application, as provided for herein.
Created: 2026-05-07 10:21:27 [EST]
(Supp. No. 55)
Page 33 of 35
(d) The planning commission shall review applications for compliance with the criteria for designating a scenic
highway established in this article (see section 26-156, appendix B). Upon completion of the review, the
planning commission shall by vote determine a recommendation regarding the designation of the subject
highway. The planning commission's recommendation shall be forwarded to county council. In the event
county council determines the proposed highway merits designation as a scenic highway, it shal l so indicate
its decision by ordinance. Prior to enactment of such ordinance, county council shall hold a public hearing on
the question of the proposed scenic highway designation. Notice of the public hearing shall be published in a
newspaper of general circulation in the county at least 15 days prior to the subject meeting, and written
notice containing all pertinent information related to the public hearing shall be sent by first class mail to the
owner of each parcel that is contiguous to the proposed scenic highway at least 15 days prior to the hearing.
For the purposes of this section, the name and address of the owner of the parcel shall be as listed on the tax
records maintained by the county tax assessor.
(e) Any highway proposed for designation as a scenic highway that is rejected for designation by county council,
may not be proposed again for a period of one year from the date of publication of the decision.
(Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2019-10, § 1(Exh. A), 3-5-2019; Ord. No. 2025-06, § 1(Exh. A),
4-1-2025)
Sec. 26-154. Regulations.
(a) It shall be unlawful for any person other than the owner, owner's agent, or other individual with the full
knowledge and consent of the owner of a property situated along the right -of-way of a designated and
properly identified scenic highway to dig, pull up, gather, remove, cut, maim, break, or injure in any way a
public or private property, to include any injury done by fires intentionally set, and to include any injury done
to any wild, cultivated, or ornamental plants, shrubs, and trees. These provisions shall not apply where the
acts hereby prohibited are done by or under the instructions of county or state authorities lawfully in charge
of such public roads, highways or lands, or by a utility in the lawful pursuit of installation or maintenance of
their facilities. Violation of this provision of this article shall be punishable by a fine not to exceed $500.00.
(b) The sponsoring organization or property owner(s) submitting an application to the county for designation of
a highway as a scenic highway shall be responsible for the removal of trash along the portion of the highway
so designated as a scenic highway no fewer than three times each year. Permits and/or required notifications
related to any and all activities inside a right-of-way shall be the responsibility of the sponsoring organization
or property owner(s). Any individual taking part in trash removal duties, or any other activities related to the
standards of this article, shall comply with any and all standards and practices utilized by the entity
responsible for maintenance of the highway.
(c) A member of the county staff shall be designated by the county administrator to review the status of all
county designated scenic highways every two years, or more frequently if deemed necessary by the county
administrator or the designated staff member. In the event it is determined that a route fails to meet the
criteria established in this article, a report shall be made to the planning commission, which shall notify the
sponsoring organization or property owner(s) of the nature of the failure(s) and provide a 45-day period for
corrective action. The planning commission shall thereafter recommend a course of action to county council
if necessary. Such recommendations may include, but are not limited to, reclassification to a lower category
and/or redesignation.
(d) Regulations contained in this section shall apply equally to both category I and category II scenic highways;
however, category II scenic highways shall receive preference in the pursuit of funding to be utilized in
maintaining and enhancing the intrinsic values leading to their designation.
(e) A determination of this issue must be made within six months of the county receiving an application.
Created: 2026-05-07 10:21:27 [EST]
(Supp. No. 55)
Page 34 of 35
(Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025)
Sec. 26-155. Appendix A.
A scenic highway corridor management plan shall include the following components:
(1) A detailed description of the section of the highway to be designated, including two or more of the
intrinsic qualities as defined in this article; a specification as to how the highway in question fits the
criteria; an identification of any problem areas that may impact the scen ic highway designation.
(2) A marked map clearly indicating the section of the highway the applicant is proposing for designation.
(3) Photographs or videos of areas which the applicant considers to be of intrinsic value or significance.
(4) Letters of support from citizens, businesses, civic groups, and other organizations.
(5) A maintenance plan outlining proposed litter collection activities.
(6) Any additional proposed actions intended to enhance and maintain the highway if designated a scenic
highway.
(Ord. No. 2017-22, § 1(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025)
Sec. 26-156. Appendix B.
Criteria for designating a highway as a scenic highway.
(a) The planning commission shall consider the following in determining whether a highway should be
designated as a scenic highway.
(1) Intrinsic qualities (as defined by this article).
(2) Additional amenities and support (such as but not limited to):
a. Hospitality features.
b. Length of route.
c. General support for proposed route.
d. Financial commitment.
e. Role in regional/statewide strategy.
f. Protective easements, zoning overlays, or other land use restrictions.
(3) Features negatively impacting the scenic qualities of the highway, (such as but not limited to):
a. Junkyards/litter.
b. Dilapidated/unattractive structures.
c. Excessive advertising.
d. Heavy traffic uses.
e. Mining/lumbering scars.
f. Heavy industry.
g. Parallel and visible utilities along highway.
Created: 2026-05-07 10:21:27 [EST]
(Supp. No. 55)
Page 35 of 35
h. Landfills/other pollutants visible from route.
(4) Feasibility of maintenance plan and responsibilities.
(Ord. No. 2017-22, § 2(Exh. A), 9-19-2017; Ord. No. 2025-06, § 1(Exh. A), 4-1-2025)
- CODE OF ORDINANCES
Chapter 32 UNIFIED PERFORMANCE STANDARDS
Oconee County, South Carolina, Code of Ordinances Created: 2026-05-07 10:21:31 [EST]
(Supp. No. 55)
Page 1 of 111
Chapter 32 UNIFIED PERFORMANCE STANDARDS1
ARTICLE I. IN GENERAL
Sec. 32-1. Authority of chapter provisions.
These performance standards and land development regulations are adopted under authority granted by
S.C. Code 1976, § 6-29-310 et seq., otherwise known as the Comprehensive Planning Enabling Act of 1994.
(Ord. No. 1999-14, § 1.1, 4-4-2000)
Sec. 32-2. Jurisdiction and purpose of chapter.
The regulations of this chapter shall apply to new development and to specified uses of land within the
unincorporated areas of the county as now or hereafter established, and to municipalities wit hin the county that
have adopted the provisions of this chapter and have contracted with the county for the enforcement thereof. The
purpose of this chapter is to establish regulations and standards that specify a minimum requirement or maximum
limit on the impact of certain land uses and development. The standards of this chapter are based upon
consideration of the impact upon adjacent land, residents and the general health, safety, and welfare of the
county as a whole.
(Ord. No. 1999-14, § 1.2, 4-4-2000)
Sec. 32-3. Existing regulations and standards; conflicts.
This chapter shall complement existing regulations addressing road standards, manufactured housing, and
other design and safety regulations until such time as this chapter is amended to include specific provision for
those aspects of development and land use. In the case of any conflict between the performance standards set
forth herein and any other rules and regulations, the more restrictive shall apply.
(Ord. No. 1999-14, § 1.4, 4-4-2000)
Sec. 32-4. County planning commission.
(a) Authority to establish. The county planning commission (referred to as the "planning commission") is
established pursuant to S.C. Code 1976, § 6-29-310 et seq.
1Cross reference(s)—Any ordinance or resolution regarding a comprehensive plan, land use, unified development,
zoning or subdivisions saved from repeal, § 1-10(10); buildings and building regulations, ch. 6; environment,
ch. 12; floods, ch. 16; planning and development, ch. 24.
State law reference(s)—Authority of county to provide for land use regulations, S.C. Code 1976, § 4 -9-30(9); S.C.
Government Comprehensive Planning Enabling Act of 1994, S.C. Code 1976, § 6 -29-310 et seq.
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 2 of 111
(b) Functions, powers and duties. It is the function and duty of the county planning commission to undertake a
continuing planning program for the physical, social, and economic growth, development, and
redevelopment of the county. The plans and programs must be designed to promote public health, safety,
morals, convenience, prosperity, or the general welfare as well as the efficiency and economy of the county.
Specific planning elements must be based upon careful and comprehensive surveys and studies of existing
conditions and probable future development and include recommended means of implementation. The
county planning commission may make, publish, and distribute maps, plans, and reports and
recommendations relating to the plans and programs and the development of the county to public officials
and agencies, public utility companies, civic, educational, professional, and other organizations and citizens.
All public officials shall, upon request, furnish to the planning commission, within a reasonable time, such
available information as it may require for its work. The planning commission, its members and employees,
in the performance of its functions, may enter upon any land with consent of the property owner or after ten
days' written notification to the owner of record, make examinations and surveys, and place and maintain
necessary monuments and marks on them, provided, however, that the planning commission shall be liable
for any injury or damage to property resulting therefrom. In general, the pla nning commission has the
powers as may be necessary to enable it to perform its functions and promote the planning of the county.
In the discharge of its responsibilities, the county planning commission has the power and duty to:
(1) Prepare and revise periodically plans and programs for the development and redevelopment of the
county as provided in S.C. Code 1976, § 6-29-310 et seq.; and
(2) Prepare and recommend for adoption to the county council as a means for implementing the plans and
programs:
a. Performance (performance zoning) standards and zoning ordinances to include zoning district
maps and appropriate revisions thereof;
b. Regulations for the subdivision or development of land and appropriate revisions thereof, and to
oversee the administration of the regulations that may be adopted;
c. An official map and appropriate revisions on it showing the exact location of existing or propo sed
public street, highway, and utility rights-of-way, and public building sites, together with
regulations to control the erection of buildings or other structures or changes in land use within
the rights-of-way, building sites, or open spaces;
d. A landscaping ordinance setting forth required planting, tree preservation, and other aesthetic
considerations for land and structures;
e. A capital improvements program setting forth capital projects (as such term is defined in chapter
2, article IV, division 8, section 2-392 of this Code of Ordinances) required to implement or in
conformity with plans which have been prepared and adopted, including an annual listing of
priority capital projects for consideration by county council prior to preparation of its ca pital
budget;
f. Policies or procedures to facilitate implementation of planning elements; and
Appeals regarding alleged errors by the planning director concerning a decision on a land development
plan or subdivision may be heard by the planning commission. The planning commission shall act on
the appeal within 60 days and the action of the planning commission is final. An appeal from the
decision of the planning commission may be taken to circuit court within 30 days after actual notice.
(3) Coordinate with, and receive scored proposals for capital projects from, the Oconee County Capital
Projects Advisory Committee pursuant to chapter 2, article IV, division 8 of this Code of Ordinances.
(c) Membership.
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 3 of 111
(1) The membership of the county planning commission shall be seven in number, selected and appointed
by a majority vote of the membership of the county council voting in any meeting of county council,
duly assembled, with one member being selected from each of the five county council districts in
existence and as delineated at the time of the adoption of this section, nominated by the respective
member of county council from each district, together with two members appointed by county council
from the county at-large. County council may receive recommendations for the two at-large seats from
the county planning commission, the county soil and water conservation district commission, the
county school board, and any other interested organization or agency, and county council welcomes
any such recommendations; however, county council is not required to wait on such
recommendation(s) before county council selects and appoints one or both at -large members, nor is
county council obligated to select and appoint any person recommended. Nothwithstanding any other
provision hereof, the complete selection and appointing authority for the entire county planning
commission, including, without limitation, the at-large members, rests with county council, and the
ultimate decision of whom to select and appoint for any of the membership positions is that of county
council, by a majority vote of the membership of the county council voting in any meeting of county
council, duly assembled, with or without any recommendation.
(2) If after an appointment of a member to represent a particular council district of the county to the
planning commission, such district is altered, then such commission member shall continue to serve
thereon for the remainder of the term to which said member is appointed, regardless of his/her place
of residence within the county.
(3) In the event the county is further divided into additional county council districts, additional
appointments of members to the commission to represent the newly created district(s) may be made
by county council through amendment of this section.
(4) Should any member of this commission move and establish residence outside of the county or the
district where such member was residing at the time of the appointment to this commission, such
move shall constitute a resignation by the member, and a replacement member shall be appointed to
fill the unexpired term of such resigned member, in the same manner as the original appointment.
(5) No member of the planning commission may hold an elected public office within the boundaries of the
county.
(d) Terms of members.
(1) The length of the regular term served by each member shall be four (4) years, beginning on January 1
of the year of appointment.
(2) For the purposes of implementing the standards of this section, and thereby retu rning the
reappointment/replacement schedule of the membership of the commission to staggered lengths in as
fair and equitable manner as possible, the following shall apply:
a. All members appointed by county council district shall serve for the same term as the length of
the remaining term of the council member who appointed them, after which the term of such
district members shall be equal to and coincidental with the term of the council member
appointing or reappointing them, with all terms or parts thereof starting as of January 1 of the
year of appointment or reappointment.
b. The first at-large member appointed by county council after adoption of the restatement of this
section shall serve for four years and the second such at -large member shall serve for two years,
after which the term of each such at-large member shall be four years following
appointment/reappointment, with all terms or parts thereof starting as of January 1 of the year
of appointment or reappointment.
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 4 of 111
(3) In the event the regular term of a member in good standing expires prior to reappointment or
replacement by county council, said member shall continue to serve until his/her replacement is
appointed and qualified. The date of reappointment or replacement, however, in no way alters the
scheduled length of the term.
(e) Removal of members. Members of the county planning commission may be removed at any time by a
majority vote of the county council, for cause (defined herein as dereliction of duty, as duties are defined
herein, conviction of any felony or any crime of moral turpitude, or violation of the South Carolina Ethics Act,
all as determined by county council). If, or in the event, any member of the commission shall fail to attend 50
percent or more of the regularly scheduled meetings of the commission within any period of 12 calendar
months without excuse of the commission chairman, such member may be replaced without notice by action
of the county council.
(f) Organization, meetings, procedural rules, records, and purchases. The county planning commission shall
organize itself, electing one of its members as chairman and one as vice -chairman, whose terms must each
be for one-year. The chairman and vice-chairman shall have the right to vote. The commission shall appo int a
secretary, who may be a member or an employee of the county council or of the commission. If the secretary
is a member of the commission, he/she shall also have the right to vote. The commission shall meet at the
call of the chairman, and at such times as the chairman or commission may determine. Vacancies in such
offices by reason of death, resignation or replacement shall be filled for the unexpired term of the officer
whose position becomes vacant, in the same manner as the original election or app ointment.
The commission shall adopt rules of organizational procedure, and maintain a record of its resolutions, findings,
determinations, recommendations, and other actions as required by state and federal requirements.
Typical operational expenses of the commission shall be provided for in the budget of the planning department;
however, the commission may from time to time employ or contract for professional services with funds
appropriated by county council.
(g) Powers and duties. The county planning commission shall have those powers and duties provided for in Title
6, Chapter 29 of the South Carolina Code of Laws, 1976, as amended, to be exercised with respect to the
total unincorporated area of Oconee County, South Carolina, and to include the func tion to undertake a
continuing planning program for the physical, social, and economic growth and development, and
redevelopment, throughout its area of responsibility. The commission shall, within the bounds of standards
established in state law, draft and periodically review a comprehensive plan for the county, which shall be
the basis for a planning process consisting of those elements considered critical, necessary, and desirable to
guide the development and redevelopment for the county. It shall also b e the duty of the planning
commission to provide advice to the county council on any and all matters related to growth and
development within the unincorporated areas of the county.
(h) Salaries and funding. Each member of the county planning commission shall be paid the sum of $25.00 per
meeting of the commission attended, or as county council shall subsequently direct by ordinance or
resolution. Additionally, members shall be compensated at the same rate, and in the same manner, as
county employees for expenses incurred as a result of attending schools, seminars, meetings, and other
normal activities associated with membership, provided said trips and activities are approved in advance by
the chairman of county council.
(Ord. No. 1999-14, § 1.4, 4-4-2000; Ord. No. 2009-10, § 1, 5-19-2009; Ord. No. 2010-14, §§ 2(Exh. B), 3(Exh. C), 8-
17-2010; Ord. No. 2011-06, § 2, 3-15-2011)
Cross reference(s)—Boards, commissions and committees, § 2-241 et seq.
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 5 of 111
Sec. 32-5. Zoning board of appeals.
(a) Authority to establish. The county zoning board of appeals shall be established and shall be referred to as
"the board," as defined in S.C. Code 1976, § 6-29-780 et seq.
(b) Membership. The board shall consist of seven members, a majority of which shall constitute a quorum.
Members shall be appointed by the county council, and shall serve overlapping terms of three years, except
that original appointees shall serve for staggered terms. Members whose terms have expired shall continue
serving until a successor has been appointed by the county council. Members may serve an unlimited
number of consecutive terms. A vacancy in membership shall be filled for the unexpired term in the same
manner in which the original appointment was made. The county council shall have the authority t o remove
any member of the board for cause or for violating any of the bylaws, as adopted by the board. The county
council shall have the authority to approve a budget for the board and to appropriate funds for the board's
activities. Members shall serve without compensation, unless authorized by the county council. No board
member shall hold any other public office or position in the county or a municipality in the county.
(c) Initial appointments. Upon concluding the appointment of the initial seven members of the board, members
shall determine terms through a random drawing, with two members to have a term of one year, two
members to have a term of two years, and three members to have a term of three years.
(d) Organization. The board shall elect one of its members as chair, who shall serve for one year or until
reelected or until a successor is elected and qualified. The board shall appoint a secretary who may be an
employee of the county or who may be a member of the board. The board shall adopt rules of procedures to
be contained in bylaws. Meetings shall be held at the call of the chair. Public notice of meetings shall be
provided by publication in a newspaper of general circulation in the county. The chair may administer oaths
and compel the attendance of witnesses by subpoena. The board shall keep minutes of its proceedings,
showing the vote of each question.
(e) Public meetings and public records. All meetings of the board shall be open to the public, unless an executive
session is declared to receive advice from legal counsel. All meeting minutes shall be public records and shall
be available for inspection at the office of the designated administration official during regular office hours of
the county government.
State law reference(s)—Similar provisions, S.C. Code 1976, §§ 6-29-780, 6-29-790.
(f) Powers; variances; special exceptions.
(1) The board of appeals has the following powers:
a. Appeals: to hear and decide appeals (excepting actions involving the subdivision of land) where it
is alleged that there is error in an order, requirement, decision, or determination made by an
administrative official in the enforcement of the performance standards ordinance;
b. Special exception: to permit uses by special exception subject to the terms and co nditions for the
uses set forth for such uses in the performance standards ordinance;
c. Variance: to hear and decide requests for variance from the requirements of the performance
standards ordinance when strict application of the provisions of such ordi nance would result in
unnecessary hardship.
(2) General criteria for granting a special exception. The board shall grant a special exception only if it finds
adequate evidence that any proposed development will meet all of the following general requiremen ts
as well as any specific requirements and standards listed for the proposed use. The board shall among
other things require that any proposed use and location be:
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 6 of 111
a. In accordance with the comprehensive plan and is consistent with the spirit, purposes, and the
intent and specific requirements of this chapter;
b. In the best interests of the county, the convenience of the community and the public welfare;
c. Suitable for the property in question, and designed, constructed, operated, and maintained so as
to be in harmony with and appropriate in appearance to the existing or intended character of the
general vicinity;
d. Suitable in terms of effects on highway traffic, parking and safety with adequate access
arrangements to protect streets from undue congestion and hazard;
The developer shall have the burden of providing evidence to the county of compliance with the general
requirements of this chapter and the specific requirements of the applicable section. The board may impose
whatever reasonable conditions it deems necessary to ensure that any proposed development will secure
substantially the objectives in this chapter.
(3) General criteria for granting a variance. A variance may be granted in an individual case of unnecessary
hardship if the board makes and explains in writing the following findings:
a. There are extraordinary and exceptional conditions pertaining to the particular piece of property.
b. These conditions do not generally apply to other property in the vicinity.
c. Because of these conditions, the application of the ordinance to the particular piece of property
would effectively prohibit or unreasonably restrict the utilization of the property.
d. The authorization of a variance will not be of substantial detriment to adjacent property or to the
public good, and the character of the district will not be harmed by the granting of the variance.
1. The board may not grant a variance, the effect of which would be to allow the
establishment of a use not otherwise permitted or to extend physically a nonconfor ming
use of land. The fact that property may be utilized more profitably, should a variance be
granted, may not be considered grounds for a variance.
2. In granting a variance, the board may attach to it such conditions regarding the location,
character, or other features of the proposed building, structure, or use as the board may
consider advisable to protect established property values in the surrounding area, or to
promote the public health, safety, or general welfare.
(Ord. No. 1999-14, § 1.5, 4-4-2000)
Cross reference(s)—Boards, commissions and committees, § 2-241 et seq.
State law reference(s)—Similar provisions, S.C. Code 1976, § 6-29-800.
Sec. 32-6. Appeals; generally.
(a) Time limit for appeals. Appeals to the board may be taken by any person aggrieved or by any officer,
department, board, or bureau of the county. The appeal must be taken within a reasonable time, by filing
with the planning director and with the board of appeals notice of appeal specifying the grounds of it. The
appeals must be taken within 30 days from the date the appealing party has received actual notice of the
action from which the appeal is taken. The planning director shall immediately transmit to the board all the
papers constituting the record upon which the action appealed from was taken.
(b) Appeal stays action. An appeal stays all legal proceedings in furtherance of the action appealed from, unless
the officer from whom the appeal is taken certifies to the board, afte r the notice of appeal has been filed
with him, that by reason of facts stated in the certificate a stay would, in his opinion, cause imminent peril to
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 7 of 111
life and property. In that case, proceedings may not be stayed otherwise than by a restraining order whi ch
may be granted by the board or by a court of record on application, on notice to the officer from whom the
appeal is taken, and on due cause shown.
(c) Hearing; advertisement. The board shall fix a reasonable time for the hearing of the appeal or other matter
referred to it, and give at least 15 days' public notice of it in a newspaper of general circulation in the
community, as well as due notice to the parties in interest, and decide the same within a reasonable time. At
the hearing, any party may appear in person or by agent or by attorney.
(d) Authority to reverse, affirm, modify decisions. In exercising such power, the board of appeals may, in
conformity with the provisions of this chapter, reverse or affirm, wholly or in part, or may modify the or der,
requirements, decision, or determination, and to that end shall have all the powers of the officer from whom
the appeal is taken and may issue or direct the issuance of a permit. The board in the execution of the duties
specified in this chapter may subpoena witnesses and in case of contempt may certify this fact to the circuit
court having jurisdiction.
(e) Decisions to be put in writing. All final decisions and orders of the board must be in writing and be
permanently filed in the office of the board as a public record. All findings of fact and conclusions of law must
be separately stated in final decisions or orders of the board which must be delivered to parties of interest by
certified mail.
(f) Appeals from decisions of the board. Any person who may have a substantial interest in any decision of the
board may appeal from any decision of the board to the circuit court in and for the county by filing with the
clerk of court a petition in writing setting forth plainly, fully and distinctly wherein s uch decision is contrary
to law. Such appeal shall be filed within 30 days after the decision of the board is rendered.
(g) Fees may be charged to offset the cost of the appeals process. Reasonable fees may be established by the
county council to cover the costs of administering the appeals process. Fees shall be established by
resolution by the county council and may be adjusted by subsequent resolution.
(Ord. No. 1999-14, § 1.6, 4-4-2000)
State law reference(s)—Similar provisions, S.C. Code 1976, §§ 6-29-820, 6-29-830.
Sec. 32-7. Administration of the performance standards and land use regulations.
The county planning director is designated by the county council as the zoning administrator to administer
the performance standards and land development regulations. The county council shall employ such staff as
necessary to assist the planning director in his duties.
(Ord. No. 1999-14, § 1.7, 4-4-2000)
Secs. 32-8—32-40. Reserved.
ARTICLE II. SEXUALLY ORIENTED BUSINESSES2
2Editor's note(s)—Ord. No. 2015-05, § 1(Att. A), adopted Apr. 5, 2016, amended Art. II in its entirety to read as
herein set out. Former Art. II, §§ 32-41—32-58, pertained to similar subject matter, and derived from Ord.
No. 1999-14, §§ 2.1, 2.2, 2.5—2.11, 2.13—2.25, 2.29, adopted Apr. 4, 2000.
Cross reference(s)—Sexually oriented businesses, § 8-31 et seq.
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 8 of 111
State law reference(s)—Massage/Bodywork Practice Act, S.C. Code 1976, § 40-30-10 et seq.
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 9 of 111
Sec. 32-41. Purpose and intent of article.
It is the purpose of this article to regulate sexually oriented businesses in order to promote the health,
safety, and general welfare of the citizens of the county, and to establish reasonable and uniform regulations to
prevent the deleterious locating and concentration of sexually oriented businesses within the county. The
provisions of this article have neither the purpose nor effect of imposing a limitation or restriction on the content
of any communicative material, including sexually oriented material. Similarly, it is not the intent or effect of this
article to restrict or deny access by adults to sexually oriented materials or expressions that are protected by the
First Amendment to the Constitution of the United States of America, or to deny access by the distributor and
exhibitors of sexually oriented entertainment to their intended market. Neither is it the intent or effect of this
article to condone or legitimize any act which is otherwise prohibited and punishable by law.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-42. Findings of fact.
(a) There exists potential for the establishment of sexually oriented businesses in the county, and it is in the
interest of the public health, safety, and welfare, of the citizens of the county to provide for minimum
standards and regulations for sexually oriented businesses, as well as for the health, safety, and general
welfare of the owners, operators, employees, and patrons of such businesses.
(b) Sexually oriented businesses generate secondary effects which are detrimental to the public health, safety,
and welfare. Additionally, sexually oriented businesses are frequently used for unlawful sexual activities,
including public sexual indecency, prostitution, and sexual encounters of a casual nature. Such businesses are
of particular concern to the community when they are located in close proximity to each other, or close to
residences, schools, churches, parks, or playgrounds.
(c) The concern over sexually transmitted diseases is an additional legitimate concern for the county, which
demands reasonable regulation of sexually oriented businesses in order to protect the health and well being
of citizens.
(d) Live entertainment at sexually oriented businesses sometimes involves a considerable amount of bodily
contact between patrons and seminude or nude employees and dancers, including physical contact such as
hugging, kissing, and sexual fondling of employees or patrons. Many sexually oriented businesses have
"couch" or "straddle" dancing, in which employees do such things as sit in a patron's lap, place their sexual
organs against a patron while physical contact is maintained, or gyrate in a manner so as to simulate sexual
intercourse. Such activity can be defined as obscene and illegal in accordance with S.C. Code 1976, § 16 -15-
10 et seq. Such behavior can also lead to prostitution and the spread of sexually transmitted diseases. The
planning commission and county council of the county recognizes that the prevention of these and similar
activities that pose a threat to the health, safety, and general welfare of the citizens of the county is clearly
within the police powers of the county. Further, the planning commission and county council of the county
believes that prohibiting contact between performers and patrons at sexually oriented business
establishments is a reasonable and effective means of addressing these legitimate governmental interests.
Also, the planning commission and county council of the county recognize that regulating the location of
sexually oriented businesses is an additional reasonable and effective means of addressing secondary effects
associated with these activities.
(e) The establishment of a permit process is a legitimate and reasonable means of accountability to ensure that
operators of sexually oriented businesses comply with reasonable regulations to facilitate the enforcement
of legitimate distancing requirements, and to ensure that operators do not allow their establishments to be
used as places of illegal activities or solicitation.
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 10 of 111
(f) The location of sexually oriented businesses close to residential areas, schools, churches, parks, or
playgrounds leads to the decline in the general welfare of the area, leads to conditions that give rise to
crime, and places children in a position such that they are endangered by secondary effec ts of these
activities.
(g) It is not the intent of this article to suppress speech activities protected by the First Amendment of the
Constitution of the United States of America or to place any permissible burden on any constitutionally
protected expression or expressive conduct by the enactment of this article. Rather, it is the intent of the
county to enact a content neutral regulation that addresses the threats to the public health, safety, and
general welfare that are produced by sexually oriented businesses.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-43. Enforcement of article provisions.
(a) Penalty; injunction. A person who is found by a court of law to have operated or have caused to be operated
a sexually oriented business without a permit or in any other manner that is in violation of this article is
subject to suit for injunctive relief as well as prosecution for criminal violations. Such violations shall be
punishable in accordance with section 1-7. Each day a person operates or causes to be operated a sexually
oriented business in a manner that is in violation of this article shall constitute a s eparate offense.
(b) Article regulations in addition to other valid law. The regulations included in this article are in addition to any
other valid laws or regulations of the United States of America, the state or the county. Nothing in this article
is intended to or shall be interpreted as invalidating any other laws or regulations. Any penalties imposed by
a court of law for the violation of this article shall not interfere with any separate criminal prosecution or
penalty levied for any other criminal act.
(c) Seeking of relief not limited. Nothing in this article is intended to or shall be interpreted as limiting the rights
of the county, any citizen, or any entity from seeking any relief from any cause for action as proscribed by
state law.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-44. Definitions.
The following words, terms and phrases, when used in this article, shall ha ve the meanings ascribed to them
in this section, except where the context clearly indicates a different meaning:
Adult arcade means any place to which the public is permitted or invited wherein coin-operated, slug-
operated or electronically, or mechanically-controlled still or motion picture machines, projectors or other image -
producing devices are maintained to show images to one or more persons per machine at any one time, and
where the images so displayed are distinguished or characterized by the depicting or describing of "specified
sexual activities" or "specified anatomical areas."
Adult bookstore, adult retail store or adult video store means a commercial establishment which excludes any
person by virtue of age from all or part of the premises generally held open to the public where products or
equipment distinguished or characterized by a predominant emphasis or simulatio n of "specified sexual activities"
or "specified anatomical areas" are sold, rented, or displayed therein, or which has as one of its principal business
purposes, the sale or rental for any form, for consideration, one or more of the following:
(1) Books, magazines, periodicals or other printed matter, or photographs, films, motion pictures,
videocassettes or video reproductions, slides, or other visual representations which depict or describe
"specified sexual activities" or "specified anatomical areas."
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 11 of 111
(2) Instruments, devices, paraphernalia or clothing which are designed for use in connection with
"specified sexual activities," excluding condoms and other birth control and disease prevention
products. A commercial establishment may have other principal busi ness purposes that do not involve
the offering for sale or rental of materials depicting or describing "specified sexual activities" or
"specified anatomical areas" and still be categorized as an adult bookstore or adult video store so long
as one of its principal business purposes is the offering for sale or rental the specified materials which
describe "specified sexual activities or "specified anatomical areas."
(3) Adult bookstore, adult retail store, or adult video store does not mean any establishmen t which
displays, rents or sells sexually-explicit materials in an enclosed room equal to less than ten percent of
the business' total square footage, and which prohibits anyone under 18 years of age from entering the
room.
(4) Principal business purpose, as used in this section, means that more than 25 percent of the "stock in
trade" of the business is devoted to the display, rent, or sale of items, products, or equipment
distinguished or characterized by a predominant emphasis on, or simulation of, "spec ified sexual
activities" or "specified anatomical areas."
(5) Stock in trade for purposes of this subsection shall mean the greater of:
a. The retail dollar value of all items, products or equipment readily available for purpose, rental,
viewing or use by patrons of the establishment, excluding material located in any storeroom or
other portion of the premises not regularly open to patrons; or
b. The total volume of shelf space and display area.
Adult cabaret means a nightclub, bar, restaurant or similar commercial eating or drinking establishment, which
regularly features:
(1) Persons who appear in a state of nudity.
(2) Live performances which are characterized by the exposure of "specified anatomical areas" or by
"specified sexual activities."
(3) Films, motion pictures, videocassettes, slides or other photographic reproductions which are
characterized by the depiction or description of "specified anatomical areas."
Adult car wash means a car wash where some or all of the employees are seminude or nude and/or where
"specified sexual activities" or "specified anatomical areas" are exhibited.
Adult motel means a hotel, motel or similar commercial establishment which:
(1) Offers accommodations to the public for any form of consideration; provides pat rons with closed
circuit television transmissions, films, motion pictures, videocassettes, slides or other photographic
reproductions which are characterized by the depiction or description of "specified sexual activities" or
"specified anatomical areas," and which may have a sign visible from the public right-of-way which
advertises the availability of this type of photographic reproductions;
(2) Routinely offers a sleeping room for rent for a period of time that is less than eight hours;
(3) Routinely allows a tenant or occupant of a sleeping room to subrent the room for a period of time that
is less than eight hours; or
(4) Evidence that a sleeping room in hotel, motel, or a similar commercial establishment has been rented
and vacated two or more times in a period of time that is less than eight hours creates a rebuttable
presumption that the establishment is an adult motel as that term is defined in this section.
Adult motion picture theater means a commercial motion picture theater, one of whose primary business
purpose is, for any form of consideration, to regularly show films, motion pictures, videocassettes, slides or similar
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 12 of 111
photographic reproductions which are characterized by the depiction or description of "specified sexual activities"
or "specified anatomical areas."
Adult theater means a commercial theater, concert hall, auditorium, or similar commercial establishment,
one of whose primary business purpose is to regularly feature persons who appear in a state of nudity or which
features live performances which are characterized by the exposure of "specified anatomical areas" or by
"specified sexual activities."
Board means the board of zoning appeals.
Certificate of nonconformity means a certificate issued by the planning department to any sexually oriented
business which is operating at the time of the enactment of this chapter, and is not in compliance with one of
more of its provisions.
Dancer means an employee of a sexually oriented business that entertains patrons through expressive for ms
of dance and/or movement.
Designated county employee means the planning director or other employee of the county who is designated
by the county administrator for the administration of this article.
Employee means an individual working and performing services for any sexually oriented business, including
any independent contractor who provides services on behalf of any sexually oriented business to the patrons of
such business.
Established or establishment means any of the following:
(1) The opening or commencement of any sexually oriented business as a new business.
(2) The conversion of an existing building or not a sexually oriented business, to a sexually oriented
business.
(3) The addition of any sexually oriented business to any other existing sexually oriented business.
(4) The relocation of any sexually oriented business.
Health club means a health club where some or all of the employees are nude or seminude, or in which
"specified sexual activities" occur or "specified anatomical areas" are exhibited.
Licensee means a person in whose name a sexually oriented business regulatory license to operate a sexually
oriented business has been issued, as well as the individual listed as an applicant on the application for a sexually
oriented business regulatory license.
Live entertainment means a person who appears nude, seminude, or a performance which is characterized
by the exposure of "specified anatomical areas" or "specified sexual activities."
Nude model studio means any place where a person appears in a state of nudity or displays "specified
anatomical areas" and is observed, sketched, drawn, painted, sculptured, photographed, or similarly depicted by
other persons who pay money or any other form of consideration.
Nude, nudity, or state of nudity means:
(1) The appearance of a bare human buttock, anus, male genitals, female genitals, or the areola or nipple
of the female breast; or
(2) A state of dress which fails to cover a human buttock, anus, male genitals, female genitals, pubic
region, or areola or nipple of the female breast.
Operate or cause to be operated means to cause to function or to put or keep in operation.
Operator means any person on the premises of a sexually oriented business who is authorized to exercise
overall operational control of the business, or who causes to function or who puts or kee ps in operation the
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 13 of 111
business. A person may be found to be operating or causing to operate a sexually oriented business whether or not
the person is an owner, part owner, or licensee of the business.
Patron means any persons who pays a sexually oriented business any form of consideration for services
provided to him by the sexually oriented business.
Person means an individual, proprietorship, partnership, corporation, association, or other legal entity.
Seminude or seminudity means a state of dress in which clothing covers no more than the genitals of a man,
or the pubic region and areola of the breasts of a woman.
Sexually oriented business means an adult arcade, adult bookstore, adult retail store or adult video store,
adult cabaret, adult motel, adult motion picture theater, adult theater, nude model studio, or any other business
such as a car wash or a health club, which offers for consideration, materials, or services characterized as depicting
"specified sexual activities" or "specified anatomical areas," or whose employees perform services in a state of
nudity or seminudity.
Sexually oriented business permit means a special annual operating permit necessary for a sexually oriented
business to do business in the unincorporated portions of the county. Such license is in addition to any other
regional, state, or county permits. The sexually oriented business regulatory permit also requires the registration
of each employee and each employee hired during the operation period authorized by the sexually oriented
business regulatory permit.
Specified anatomical areas means the male or female genitals including the vulva or more intimate parts of
the female genitals, or bare human buttocks, anus, or the areola or nipple of the f emale breast.
Specified sexual activities means any of the following:
(1) The fondling or other erotic touching of human genitals, pubic region, buttocks, anus, or female breast.
(2) Sex acts, normal or perverted, actual or simulated including intercour se, oral copulation, or sodomy.
(3) Masturbation, actual or simulated.
(4) Excretory functions as a part of or in conjunction with any of the activities set forth in subsections (1) —
(3) of this section.
Substantial enlargement of a sexually oriented business means the increase in floor areas occupied by the
business by more than ten percent as the floor areas exist on the date the original certificate of compliance was
obtained.
Transfer of ownership or control of a sexually oriented business means any of the following:
(1) The sale, lease or sublease of the business.
(2) The transfer of securities which constitute a controlling interest in the business, whether by sale,
exchange, or similar means.
(3) The establishment of a trust, gift, or other similar legal device which transfer the ownership or control
of the business, except for transfer by bequest or other operation of law upon the death of the person
possessing the ownership or control.
Viewing room means the room, booth, or area where a patron of a sexually oriented business would
ordinarily be positioned while watching a film, videocassette, video reproduction, or live production.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Cross reference(s)—Definitions generally, § 1-2.
Created: 2026-05-07 10:21:28 [EST]
(Supp. No. 55)
Page 14 of 111
Sec. 32-45. Permitting requirements for the establishment of sexually oriented businesses
within the unincorporated areas of the county.
(a) Purpose and intent. It is the purpose and intent of this section to establish a permit requirement for sexually
oriented businesses that will ensure that these businesses are operated in a manner that is in full compliance
with all applicable laws of the United States of America, the state, and the county. The purpose is also to
ensure that these businesses are operated in a manner that minimizes adverse impacts on the community
and that does not pose a threat to the public health, safety, and general welfare. Further, the purpose is to
provide the county with a reasonable and legitimate mechanism for enforcing applicable laws.
(b) Enabling authority. This section is adopted by the county council in accordance with S.C. Code 1976, § 4-9-30,
as an application of the police powers for the purpose of promoting the public health, safety, and welfare.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-46. Enumeration of permit requirements.
(a) Every person or entity engaged or intending to engage in a sexually oriented business, as defined in this
article, is required to obtain a sexually oriented business permit (referred to in this article as a permit) from
the county before initiating operation of the business. Any person or entity engaging in such business shall
have a valid permit in effect at any time in which the business is in operation.
(b) Applications for a permit shall be made to the planning director.
(c) Any person or entity engaged or intending to engage in a sexually oriented business is required to obtain and
hold a valid permit during any period of time in which the business is in operation.
(d) An application for a permit shall be made to the planning director on a form provi ded by the county. If an
entity wishing to operate a sexually oriented business is an individual, that individual must sign the permit
application. If the entity wishing to operate a sexually oriented business is other than an individual, each
individual who has at least ten percent ownership in the business must sign the permit application. If a
corporation is listed as the owner of a sexually oriented business, then each individual having at least ten
percent ownership interest in the corporation must sign the permit application. Permit applications may be
submitted during normal business hours of the county government offices. Permit applications are a matter
of public record, and may be viewed by any person during normal business hours of the county gove rnment
offices.
(e) Any applicant for a permit shall be required to provide proof of identification and proof of age.
(f) If one person or entity owns or operates more than one sexually oriented business in the county, that person
or entity must obtain and hold a separate permit for each sexually oriented business in operation.
(g) Any application for a permit must be accompanied by a sketch or diagram showing the configuration of the
property and premises, including a statement of total floor space occu pied by the business. The sketch or
diagram need not be professionally prepared, but must be drawn to a designated scale or drawn with
marked dimensions of the interior of the premises to an accuracy of plus or minus six inches.
(h) The fact that a person or entity possesses other types of state or county permits or licenses does not exempt
the individual or entity from the permit requirements of this article.
(i) The county council shall have the authority to establish reasonable fees for permits and per mit applications.
Such fees shall be appropriate to cover costs associated with the administration of this article and for the
policing of sexually oriented business establishments. Such fees shall be established by resolution by the
county council and may be changed by subsequent resolution.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 15 of 111
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Sec. 32-47. Issuance of permit.
The planning director shall approve the issuance of a sexually oriented business permit within 30 days after
receiving an application, unless he finds one or more of the conditions listed as follows to be present:
(1) The proposed business is in violation of any portion of this article, including, the section concerning
location requirements of sexually oriented businesses.
(2) The proposed business is in violation of any article or regulation of the county, any article or regulation
of any administrative department, bureau, or governmental entity of the state, or any law or regulation
of the United States of America.
(3) The applicant is under 18 years of age.
(4) The applicant has failed to provide information that is reasonably necessary and required on the permit
application form for the issuance of a permit, or has falsely answered a question or request for
information, as is required on the application form.
(5) The premises to be used for the sexually oriented business is found to be unsafe by the county fire
marshal, the county building official, or an appropriate official of the State Department of Health and
Environmental Control (DHECServices (SCDES).
(6) To apply if the applicant is an individual, the applicant, or the spouse of the applicant is found to be
overdue in payment to the county of taxes, fees, fines, of penalties assessed against the individual, or
imposed upon the individual in relation to a sexually oriented business. If the applicant is more than
one individual or is a corporation, it is found that any person having at least ten percent ownership in
the sexually oriented business, any person having at least ten percent ownership interest in a
corporation owning the sexually oriented business, or the spouse of any person having ten percent
ownership in the sexually oriented business or corporation owning the sexually oriented business is
overdue in payment to the county of taxes, fees, fines, of penalties assessed against the individual, or
imposed upon the individual in relation to a sexually oriented business.
(7) The permit fee or permit application fee required by this article and adopted by resolution of the
county council has not been paid.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Sec. 32-48. Administration and display of permits.
(a) The permit shall be printed on a form developed by the county. The planning director shall maintain a copy
of all permits issued, and shall maintain a record of permit issuances, to include the name of the business,
the name of the owner, the date of permit issuance, and the date of permit expiration.
(b) Permits and permit records are a matter of public record, and may be reviewed by any person during normal
business hours of the county government offices, except that records or information p ertaining to an
ongoing investigation of illegal otherwise noncompliant activity of a sexually oriented business, owner or
operator of a sexually oriented business, or employee of a sexually oriented business, may be shielded from
public review in accordance with state law.
(c) The permit, if granted, shall state on its face the name of the person to whom the permit is issued, the date
of issuance, expiration date, and the address of the sexually oriented business. The permit shall be posted at
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 16 of 111
a conspicuous place at or near the entrance of the sexually oriented business so that it may easily be read at
any time.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Sec. 32-49. Inspection.
(a) An applicant or permit holder shall permit representatives of the county sheriff's department, the State
Department of Health and Environmental ControlServices, local fire department, the county administrator's
office, the county attorney's office, or the county building official's office to inspect the premises of a
sexually oriented business for the purpose of ensuring compliance with the law, at any time the building is
occupied and open for business.
(b) All employees, while on duty at a sexually oriented business, must have a valid driver's license or other
government issued official identification with picture in their possession and must present that identification
to an inspecting official, as identified in subsection (a) of this section, upon demand.
(c) The permit holder (or agent or employee of the permit holder) commits a misdemeanor if it is found b y the
appropriate court of law that such lawful inspection of the premises is denied for any reason. Such refusal is
also grounds for the suspension or revocation of the permit.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-50. Expiration and renewal of permit.
All sexually oriented business permits shall be valid for a period of 12 months. Applications for renewal shall
be made planning director. An application for renewal shall be made not more than 45 days before the expiration
of a valid permit, nor less than 30 days before the expiration of a valid permit. If an application for permit renewal
is not made during this time period, the permit will lapse and an application for a new period shall be required to
continue operation of the sexually oriented business. If there is a period in which the existing permit expires
before a new permit is issued, the sexually oriented business sh all not operate during such period.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Sec. 32-51. Suspension of a permit.
The planning director shall suspend a sexually oriented business permit for a period not to exceed 30 days, if
it is determined that a permit holder or employee of a permit holder commits one or more of the acts listed as
follows:
(1) Has violated a portion of this article or any other applicable ordinance or regulation of the county, the
state, any departments, bureaus, or agencies of the state, or the United States of America.
(2) Has refused to allow the inspection of a sexually oriented business, as authorized by this article.
(3) Has failed to provide identification, as specified in section 32-49(b).
(4) Has failed to register any employee, as specified in this article, or has misrepresented the number of
employees of the sexually oriented business.
(5) Has allowed any person under 18 years of age to access the premises.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, 6-4-2019)
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 17 of 111
Sec. 32-52. Revocation of a permit.
The planning director shall revoke a sexually oriented business permit if a cause for suspension as specified
in section 32-51 has occurred at least one time during the preceding 12 months. In addition, planning director shall
revoke a sexually oriented business permit if it is determined that any of the acts listed as follows have occurred:
(1) The permit holder or an agent of the permit holder has provided false, incomplete, or misleading
information in the material submitted during the application proce ss.
(2) The permit holder, or an agent or employee of the permit holder operated the sexually oriented
business during a period of time in which no valid permit was in existence or the permit was
suspended.
(3) Any act of obscenity as specified in S.C. Code 1976, § 16-15-305 et seq., has taken place on the
premises.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Sec. 32-53. Reissuance of a permit.
If a permit for a sexually oriented business has been revoked, no new permit for that business shall be issued
for a period of 12 months from the date of revocation. This prohibition shall cover any business in the same
location, any business owned by the owner of the business for which the permit has been revoked, any business
owned by any person having at least ten percent ownership of the business for which the permit was revoked, or
any business owned by a corporation of which at least ten percent ownership interest is held by a person with at
least ten percent ownership interest in a corporation that owned the business for which the permit was revoked.
Such prohibition shall also apply to the spouse of any person meeting the criteria listed above. Any permit holder
who has had two permits revoked within a period of 36 months, shall be prohibited from being issued a permit for
a period of five years. This regulation shall apply to any individual who shall have at least ten percent interest in
the ownership of a subject business or who shall have at least ten percent ownership in a corporation which
owned a subject business. This prohibition shall also apply to the spouse of any person meeting the criteria liste d
above.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-54. Appeals of designation as a sexually oriented business; denial of permit;
suspension or revocation of permit.
(a) Any aggrieved person or entity may appeal the planning director's designation of a business as a sexually
oriented business, the denial of a permit, or the suspension or revocation of a permit to the board (a s
established in section 32-51 and 32-52 of this chapter). Such appeal must be submitted on a form developed
by the county and maintained by the planning director. Any appeal must be submitted by certified or
registered mail to the county administrator or designated employee within ten business days after
notification has been received by the applicant, person, or entity of the decision that is detrimental to the
applicant, person, or entity.
(b) Reasonable fees may be established by the county council to cover the costs of administering the appeals
process. Fees shall be established by resolution by the county council and may be adjusted by subsequent
resolution.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 18 of 111
(c) Before making a determination on an appeal, the board shall conduct a public hearing on t he matter. Upon
submission of an application for appeal, the chair of the board shall establish the date, time, and location for
the public hearing, which shall be within 30 days of the submission of the application for appeal.
(d) Notification of the public hearing must be published in a newspaper of general circulation in the county at
least 15 days prior to the public hearing. Notice of the public hearing must also be displayed in the office of
the planning director. Further, the applicant for the appeal shall be provided notification of the location,
date, and time of the public hearing by registered mail with return receipt, or by hand delivery of an agent of
the county who is authorized to deliver legal warrants.
(e) Any person shall have the right to testify at the public hearing. Any person shall have the right to
representation by legal counsel. Any person who does testify shall be required to state their legal name and
address. The chair of the board may require the presentation of a valid driver' s license or other official
government issued identification with picture to establish the identity of any person wishing to testify.
(f) As the appeals process is a quasijudicial function, no member of the board shall accept any evidence
pertaining to the issue outside of the hearing context, except that the county employee designated for the
administration of this article may prefile a report to the board. Such report, if prefiled shall be distributed to
board of zoning appeals members at least seven days prior to the hearing. Such report shall also be provided
to the applicant for appeal either by certified mail with return receipt or by an agent of the county who is
authorized to serve legal warrants. In either case, such report shall be provided to the applicant at least three
days prior to the public hearing. Such report shall also be available for public review at the office of the
county employee designated for the administration of this article during normal business hours of the county
government. In addition, the applicant for appeal may also provide a prefiled report to the board. Such
report shall be filed with the employee who is designated to administer this article and must be filed at least
seven days prior to the public hearing. Such report shall be distributed to members of the board in an
expeditious manner. Further, such report shall be available for public review at the office of the county
employee designated for the administration of this article during normal business hours of the coun ty
government. If the applicant refuses to sign a certified mail receipt of public hearing notice or of receipt of a
prefiled report, or if the applicant cannot reasonably be located at the address provided on the application,
the designated county official shall make notice of such event, and it shall not cause the public hearing to be
delayed. If any member of the board has reason to believe that he or she has a conflict of interest in voting
on the appeal, or if any member has inadvertently received information, evidence, correspondence or
testimony regarding the appeal outside of the hearing context, that member shall report the potential
conflict, information, evidence, correspondence, or testimony to the county employee designated for the
administration of this article. That official shall inform the county attorney of such information. The county
attorney shall then provide advice as to whether the board member should participate in the deliberations,
participate in the deliberations but make public notification for the record of the information received, or
abstain from deliberations.
(g) The decision of the board of zoning appeals shall be made solely on findings of fact and shall be based on
state law or ordinances of the county. Official action may be taken only if a quorum (as specified in article I of
this chapter) is established. Decisions shall be made by a majority vote of board members present and shall
be rendered in a written form within five business days of the public hearing, and shall be available for public
review at the office of the county employee who is designated to administer this article, the county council
shall have no authority to alter a decision of the county board of zoning appeals. Any decision of the board
may be appealed to circuit court within ten days after the decision is rendered and made available for public
review.
(h) If a decision by the designated administrative officer to suspend or revoke a permit is appealed, such
decision is stayed from the time the appeal is filed until the board of appeals renders its decision. If the
board of zoning appeals upholds the order of the administrative officer, then the period of suspension or
revocation shall commence upon the date that the decision of the board is rendered.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 19 of 111
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Sec. 32-55. Transfer of a permit.
A permit holder shall not transfer a permit to another sexually oriented business, nor shall a permit holder
operate a sexually oriented business under the authority of a sexually oriented business at any location other than
the address designated in the permit. Should a sexually oriented permit change ownership, the permit may not be
transferred. A new permit may be applied for in accordance with the application procedure included within this
article by the new owner.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-56. Permit requirements of businesses operating at the time this article is adopted.
(a) Any sexually oriented business that is in operation at the time the ordinance from which this article is
enacted shall be permitted to remain in operation without a permit for a period not to exceed 120 days.
(b) If the owner of the sexually oriented business desires to operate the business for a period exceeding 120
days, the owner shall obtain a permit in the manner proscribed in section 32 -46. In order to ensure that no
lapse of time is incurred, a permit application must be submitted within 90 days of the enactment of this
article.
(c) Any existing sexually oriented business that is nonconforming to the locational requirements as stated in
section 32-57(e), may nonetheless be issued a permit in accordance with the nonconforming use provision of
this article.
(d) To provide notification of permit requirements and application procedures, once this article is enacted, the
county shall provide advertisement in a newspaper of general circulation in the county. Such advertisement
shall be published at least three times at a minimum interval of 14 day s. Such advertisement shall include
notification of permit requirements, information concerning how a permit application may be obtained, a
telephone number and address for obtaining additional information, notification that an existing sexually
oriented business may remain in operation without a permit until the designated date that is 120 days
subsequent to the enactment of the ordinance from which this article is derived.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-57. Location of sexually oriented businesses.
(a) Purpose and intent. It is the purpose and intent of this section to provide for the location of sexually oriented
businesses in a manner that promotes the public health, safety, and welfare of the county, that minimizes
secondary impacts associated with these businesses, and that allows for the reasonable establishment of
these businesses in accordance with rights as established in the Constitution of the United States of America.
(b) Enabling authority. This section is adopted by the county council, upon recommendation from the county
planning commission, in conformance with S.C. Code 1976, § 6-29-310 et seq.
(c) Consistency with comprehensive plan. This section is adopted by the county council, upon recommendation
from the county planning commission, in conformance with th e land use element of the county
comprehensive plan. Specifically, this article is adopted to accomplish short range goal #4, as identified in the
comprehensive plan.
(d) Applicability. This section shall apply to the location of any sexually oriented bus iness that is established
within the unincorporated area of the county.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 20 of 111
(e) Locational requirements. No sexually oriented business shall be established, located, or operated on a parcel
that is within 1,000 feet of any building or structure utilized for a ny of the activities listed in this section.
Further, no permit shall be granted for a sexually oriented business that is proposed for establishment on a
parcel that is within 1,000 feet of any building or structure utilized for any of the activities ident ified as
follows:
(1) A church, synagogue, mosque, other place of worship, or facility used for the formal congregation of
persons engaged in religious worship activities.
(2) A public or private school or nursery school (structure shall include building s and fenced in play areas).
(3) A residence or structure built for residency.
(4) A public park, public recreation area, or private recreation area (structure shall include the entire
parcel on which the facility is located), or any other sexually orien ted business.
(5) For the purposes of this section, measurement shall be made in a straight line without regard to
intervening structures or objects. Measurement shall be from the nearest portion of the parcel that is
proposed for the location of the sexually oriented business to the closest point of any structure
identified in this section. No more than one sexually oriented business shall be permitted on any
parcel.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016)
Sec. 32-58. Sexually oriented businesses, designated as a nonconforming use.
(a) Generally. Any sexually oriented business operating on the date that the ordinance from which t his article is
derived that is found to not be in conformance with the locational requirements, as specified in section 32 -
57(e) shall be designated as a nonconforming use. Such business shall be permitted to remain in operation
without a permit during the 120-day period, as specified in section 32-56 and shall be eligible to be issued a
permit. Upon issuance of the permit, the planning director, shall make a notation on the permit that the use
is designated as nonconforming.
(b) Supplemental regulations applied to sexually oriented businesses that are designated as a nonconforming
use.
(1) No nonconforming use shall be increased, enlarged, extended, or altered.
(2) Any sexually oriented business lawfully operating as a conforming use is not rendered a nonconforming
use due to the subsequent location of any of the activities listed in section 32 -57(e) within 1,000 feet of
the parcel upon which the sexually oriented business is located. If the permit for the sexually oriented
business shall lapse or be revoked, or if the business shall cease operation for a period of at least 60
consecutive days, then the business shall be deemed as having been terminated. In such case, no new
permit shall be issued for any business that is not in compliance with section 32 -57(e).
(3) The nonconforming status of any sexually oriented business shall be terminated if the business ceases
operation for a period of at least 60 consecutive days, if the business's permit is revoked in accordance
with section 32-52, or if the building in which the business is housed suffers damage to an extent in
which the cost of repair would exceed 50 percent of the value of the building before it was damaged.
(4) Upon the termination of the nonconforming status of the sexually oriented business, the permit shall
be permanently revoked. However, unless the revocation is in part or in whole based on one or more
of the violations included in section 32-52, the owner shall be eligible to apply for a new permit to
reestablish the business or establish a new business without waiting the one -year period, as specified
in section 32-53
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 21 of 111
(c) Issuance of permits. A designated nonconforming use may be issued no more than t hree annual permits.
Upon the termination of the third permit, the nonconforming use must terminate or relocate to a
conforming site.
(Ord. No. 2016-05, § 1(Att. A), 4-5-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Secs. 32-59—32-90. Reserved.
ARTICLE III. AIRPORT HEIGHT LIMITATION3
Sec. 32-91. Jurisdiction of article provisions.
The regulations set forth in this article shall be applicable within the area as shown on th e Official Clemson-
Oconee County Airport Height Limitation Ordinance Map. The Clemson -Oconee Airport shall be referred to as the
"Oconee County Airport." The map may be referred to as the "Clemson -Oconee County Airport Height Limitation
Ordinance Map."
(Ord. No. 1999-14, § 3.1, 4-4-2000)
Sec. 32-92. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them
in this section, except where the context clearly indicates a different meaning:
Airport means anyplace where aircraft can land and take off.
Airport elevation means the highest point of an airport's usable landing area measured in feet from sea level.
Airport height restriction districts mean as set forth in this article.
Airport, private, means any privately owned and operated airport.
Airport, public, means the county airport.
Approach surface means a surface longitudinally centered on the extended runway centerline, extending
outward and upward from the end of the primary surface and at the same slope as the airport height restriction
districts limitations set forth in section 32-93.
Conical district means the district which slopes 20 feet outward for each foot upward beginning at the
periphery of the horizontal district and at 150 feet above the airport elevation and extending to a heigh t of 350
feet above the airport elevation, or at a height of 1,242 feet above the mean sea level.
Construction means the erection or alteration of any structure either of a permanent or temporary character.
Excepted height limitations means that nothing in this article shall be construed as prohibiting the
construction or maintenance of any structure, or growth of any tree to a height up to 50 feet above the surface of
the land.
3State law reference(s)—Zoning of land surrounding certain airports, S.C. Code 1976, § 55-9-240.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 22 of 111
Height means the overall height of a structure, including any appurtenance t hereon, and for the purpose of
determining the height limitations set forth in section 32-93, the datum shall be mean sea level elevation unless
otherwise specified.
Horizontal district means a horizontal plane 150 feet above the established airport eleva tion or at a height of
1,042 feet above the mean sea level, the perimeter of which in plane coincides with the perimeter of the
horizontal district.
Lot means the least fractional part of subdivided lands, which have been duly recorded, having fixed
boundaries, an assigned number, letter, or other name through which it may be identified.
Nonconforming use means any structure, growth or use of land which was lawfully in existence prior to the
enactment of the regulations of this article and which does not conform to this article.
Nonprecision instrument runway means a runway having an existing instrument approach procedure utilizing
air navigation facilities with only horizontal guidance, or area type navigation equipment, for which a straight -in
nonprecision instrument approach procedure has been approved or planned.
Obstruction means any structure, growth, or other object, including a mobile object, which exceeds a limiting
height set forth in section 32-93.
Planning director means the administrative officer or his designee who has been designated by the county
council to administer the height ordinance regulations.
Precision instrument runway. Reserved.
Primary surface means a surface longitudinally centered on a runway. When the runway has a speciall y
prepared hard surface, the primary surface extends 200 feet beyond each end of that runway; for military runways
or when the runway has no specially prepared hard surface, or planned hard surface, the primary surface ends at
each end of that runway. The width of the primary surface is set forth in section 32-93. The elevation of any point
the primary surface is the same as the elevation of the nearest point on the runway centerline.
Runway means a defined area on an airport prepared for landing and takeo ff of aircraft along its length.
Structure means any object constructed or installed by man including, but not limited to, buildings, towers,
smokestacks, utility poles, and overhead transmission lines.
Transitional surfaces means surfaces extended outward at 90 degree angles to the extended runway
centerline.
Utility runway means a runway that is constructed for and intended to be used by propeller -driven aircraft of
12,500 pounds maximum gross weight and less.
(Ord. No. 1999-14, § 3.2, 4-4-2000)
Cross reference(s)—Definitions generally, § 1-2.
Sec. 32-93. Height restrictions.
(a) Generally. Notwithstanding any other provisions of this article, no structure may be built or vegetation
allowed to grow within any district established by this article which in any way endangers or interferes with
the landing, takeoff, or maneuvering of aircraft intending to use the airport. The height restrictions for the
individual districts shall be those planes delineated as surfaces in part 77.25, subchapter E (airspace), of title
14 of the Code of Federal Regulations, or in successor federal regulations.
(b) Airport height restriction districts. In order to carry out the provisions of this article, there are hereby created
and established certain districts which include all of the land lying beneath the approach surfaces,
transitional surfaces, horizontal surfaces, and conical surfaces as they apply to the county airport. Such
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 23 of 111
districts are shown on the Clemson-Oconee County Airport height limitation map consisting of one sheet,
prepared by Talbert & Bright, Inc., and dated March 1994, which, together with all explanatory matter
thereon, is by reference made a part of this article. A lot located in more than one of the following districts is
considered to be only in the district with the more restrictive height limitation. The various height restriction
districts are hereby established and defined as follows:
(1) Visual approach district (Runway 25). The inner edge of this visual approach district coincides with the
width of the primary surface and is 500 feet wide. The approach district expands outward uniforml y to
a width of 1,500 feet at the horizontal distance of 5,000 feet from the primary surface. Its centerline is
the continuation of the centerline of the runway.
(2) Nonprecision instrument approach district (Runway 7). The inner edge of this nonprecision instrument
approach district coincides with the width of the primary surface and is 500 feet wide. The approach
district expands outward uniformly to a width of 3,500 feet at the horizontal distance of 10,000 feet
from the primary surface. Its centerline is the continuation of the centerline of the runway.
(3) Transitional districts. The transitional districts are the areas beneath the transitional surfaces.
(4) Horizontal district. The horizontal district is established by swinging arcs of 10,000 feet r adii for all
runways designated instruments or visual from the center of each end of the primary surface of each
runway and connecting the adjacent arcs by drawing lines tangent to those arcs. The horizontal district
does not include the approach and transitional districts.
(5) Conical district. The conical district is established as the area that commences at the periphery of the
horizontal district and extends outward from the horizontal district at the slope of 20 to one for a
distance of 4,000 feet.
(c) Airport height district restrictions. Except as otherwise provided in this article, no structure shall be erected,
altered, or maintained, and no tree or other vegetation shall be allowed to grow in any district created by
this article to a height in excess of the applicable height limit established for such district. Such applicable
height limitations are hereby established for each of the districts in question as follows:
(1) Visual approach district (Runway 25): Slopes 20 feet outward for each foot u pward beginning at the
end of and at the same elevation as the primary surface and extending to a horizontal distance of 5,000
feet along the extended runway centerline.
(2) Nonprecision instrument approach district (Runway 7): Slopes 34 feet outward for each foot upward
beginning at the end of and at the same elevation as the primary surface and extending to a horizontal
distance of 10,000 feet along the extended runway centerline.
(3) Transitional district: Slopes seven feet outward for each foot upward beginning at the sides of and at
the same elevation as the primary surface and the approach surface, and extending to a height of 150
feet above the airport elevation, which is 892 feet above mean sea level. In addition to the foregoing,
there are established height limits sloping seven feet outward for each foot upward beginning at the
sides of and at the same elevation as the approach surface, and extending to where they intersect the
conical surface.
(4) Horizontal district: Established at 150 feet above the airport elevation or at a height of 1,042 feet
above mean sea level.
(5) Conical district: Slopes 20 feet outward for each foot upward beginning at the periphery of the
horizontal district and at 150 feet above the airport elevation and extending t o a height of 350 feet
above the airport elevation, 1,242 feet above mean sea level.
(6) Excepted height limitations: Nothing in this article shall be construed as prohibiting the construction or
maintenance of any structure, or growth of any tree or other vegetation to a height up to 50 feet
above the surface of the land.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 24 of 111
(7) Private airports are prohibited.
(Ord. No. 1999-14, § 3.3, 4-4-2000)
Sec. 32-94. Nonconforming situations.
(a) Generally. After the effective date of the ordinance from which this article is derived, structures which would
be prohibited under this article, structures which would be prohibited under the regulations of this article
and which were existing prior to the effective date of the ordinance from which this article is derived, shall
be considered as nonconforming. It is the intent of this article to permit these nonconformities to continue
until they are removed, but not to encourage their continual use. Nonconforming structures may be
continued provided they conform to the provisions of this article.
(b) Definitions of nonconformity. Unless the context clearly indicates otherwise, the terms defined in this
subsection are used in this article in the following manner:
Nonconforming building or structure (dimensional nonconformity) means a nonconforming situation that
occurs when the height of a building does not conform to the regulations applicable to the height restriction zone
in which the property is located.
Nonconforming project means any structure that is incomplete at the effective date of the ordinance from
which this article is derived and would be inconsistent with any regulation applicab le to the height restriction zone
in which it is located if completed as proposed or planned.
Nonconforming situation means a situation that occurs when, on the effective date of the ordinance from
which this article is derived or any amendment hereto, an existing structure does not conform to one or more of
the regulations applicable to the height restriction zone in which the structure is located.
(c) Completion of nonconforming projects. The construction or erection of any nonconforming project may be
completed, provided that all construction is done pursuant to a validly issued building permit.
(d) Extension or enlargement of nonconforming situations.
(1) Except as specifically provided in this subsection, it shall be unlawful for any person to engage in any
activity that causes an increase in the extent of nonconformity of a nonconforming situation.
(2) Physical alteration of structures or the placement of new structures on open land a re unlawful if they
result in greater nonconformity with respect to height limitations.
(3) Minor repairs to and routine maintenance of structures where nonconforming situations exist are
permitted and encouraged.
(4) A structure that is nonconforming in any respect or a structure that is used in a nonconforming manner
may be reconstructed or replaced if partially or totally destroyed, subject to the following restrictions:
a. A letter of intent is received by the planning director within six months from the time of such
destruction.
b. A building permit is obtained from the planning director within one year from the time the
damage or destruction took place.
c. The reconstructed building shall eliminate height limitation nonconformities if that can
reasonably be accomplished without unduly burdening the reconstruction process or limiting the
right to continue the nonconforming use of such building.
d. The cost of reconstruction is less than 80 percent of the assessed tax value of the structure.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 25 of 111
(5) Whenever the planning director determines that a nonconforming structure has been more than 80
percent torn down, or a tree or other vegetation is physically deteriorated or decayed, no permit shall
be granted that would allow such structure or tree or other vegetation to exceed the applicable height
limits as specified in section 32-93.
(Ord. No. 1999-14, § 3.4, 4-4-2000)
Sec. 32-95. Marking and lighting.
Notwithstanding the preceding provisions of this article, the owner of any existing nonconforming structure
or tree or other vegetation is hereby required to permit the installation, operation, and maintenance thereon of
such markers and lights as shall be deemed necessary by the county airport manager to indicate to the operators
of aircraft in the vicinity of the airport the presence of such airport obstruction. Such markers and lights shall be
installed, operated, and maintained at the expense of the county airport.
(Ord. No. 1999-14, § 3.5, 4-4-2000)
Sec. 32-96. Administration and enforcement; appeal; complaints and remedies.
(a) Administration and enforcement. The county council has designated the county planning director or his
designee to administer and enforce the provisions of this article. If the planning director shall find that any of
the provisions of this article are being violated, the planning director shall notify in writing the person
responsible for such violations, indicating the nature of the violation and ordering the action necessary to
correct it. He shall order discontinuance of illegal buildings or structures; removal of illegal buildings or
structures or of illegal additions, alterations, or structural changes: discontinuance of any illegal work being
done; or shall take any other action authorized by this article to ensure compliance with or to prevent
violation of its provisions.
(b) Building permits required. No building, mobile home, or other structure shall be erected, located, moved,
added to, or structurally altered without a certificate of ordinance compliance therefor issued by the
planning director. No building or other structure permit shall be approved by the planning director except in
conformity with the provisions of this article, unless he is so directed by the board as provided by this article.
No building permit issued under the provisions of this article for constructio n in the jurisdictional area of this
article shall be considered valid unless approved by the planning director through a certificate of ordinance
compliance.
(c) Application for building permit.
(1) All application for building permits shall be accompanied by sufficient information to allow the
planning director to determine conformance with and provide for the enforcement of this article.
(2) One copy of the plans and/or other information presented shall be returned to the applicant by the
planning director after he shall have marked such copy either as approved or disapproved and attested
to the same by his signature on such copy. The original copy of the plans, similarly marked, shall be
retained by the planning director.
(d) Certificate of ordinance compliance for new, altered, or nonconforming structures.
(1) It shall be unlawful to use, occupy, or permit the use or occupancy of any structure, building, or
premises, or all or parts thereof hereafter created, erected, changed, converted, or wholly or partly
altered or enlarged in its structure until a certificate of ordinance compliance shall have been issued
therefor by the planning director stating that the proposed structure, building, or land conforms to the
requirements of this article.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 26 of 111
(2) Failure to obtain a certificate of ordinance compliance shall be a violation of this article, and punishable
under this article.
(e) Expiration of building permit. If the work described in any building permit has not begun six months from the
date of issuance thereof, such permit shall expire; it shall be canceled by the planning director. Permit
extensions may be issued by the planning director.
(f) Complaints regarding violations and remedies. Whenever a violation of this article occurs, or is alleged to
have occurred, any person may file a written complaint. Such complaint, stating fully the causes and basis
thereof, shall be filed with the planning director. The planning director shall record properly such complaint,
immediately investigate, and take whatever action is necessary to ensure compliance with this article.
(g) Remedies. In case any building or structure is proposed to be, or is erected, constructed, reconstructed,
altered, maintained; or any land is proposed to be, or is used in violation of thi s article, the county attorney,
or any other person aggrieved, may, in addition to other remedies provided by law, institute an injunction,
abatement, or any other appropriate action or proceeding to prevent, enjoin, abate, or remove such
unlawful erection, construction, reconstruction, alteration, maintenance, or use.
(h) Penalties for violation. Any person violating any provisions of this article shall be guilty of a misdemeanor,
and upon conviction shall be imprisoned for a period not to exceed 30 days and/or fined not more than
$200.00 for each offense. Each day such violation continues shall constitute a separate offense. Nothing
contained in this section shall prevent the county from taking such other lawful action as is necessary to
prevent or remedy any violation.
(Ord. No. 1999-14, § 3.6, 4-4-2000)
Cross reference(s)—Administration, ch. 2.
Sec. 32-97. Appeals.
Appeals from the decision of the planning director and appeals from decisions of the board shall be heard in
accordance with article I of this chapter.
(Ord. No. 1999-14, § 3.7, 4-4-2000)
Sec. 32-98. Amendments.
(a) Authority. This article, including the airport height limitation map, may be amended from time to time by the
county council as specified in this section, but no amendment shall become effective unless it shall have
been proposed by or shall first have been submitted to the planning commission. The planning commission
shall have 30 days within which to submit its report. If the planning commission fails to submit a report
within the 30-day period, it shall be deemed to have approved the proposed amendment.
(b) Requirements for change. When the public necessity, convenience, or general welfare justify such action, and
after the required review and report of the planning commission, the county council may undertake the
necessary steps to amend the height ordinance.
(c) Procedure for amendment. Requests to amend the height ordinance shall be processed in accordance with
the following requirements:
(1) Initiation of amendments. A proposed amendment to the height ordinance may be initiated by the
planning commission or by the owners of the property proposed to be changed; provided, however,
that action shall not be initiated for an amendment affecting the same parcel or parcels of property or
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 27 of 111
any part thereof, and requesting the same change in district classification by a property owner of more
than once every 12 months.
a. Applications for amendments must be submitted, in proper from, at least 20 days prior to a
planning commission meeting in order to be heard at that meeting.
b. The planning commission, at regular meetings, shall review and prepare a report, including its
recommendation for transmittal to the county council.
c. All meetings of the planning commission shall be open to the public. At a meeting, any party may
appear in person, or by agent, or by attorney.
d. No member of the planning commission shall participate in a matter in which he has any
pecuniary or special interest.
e. Following action by the planning commission, all papers and data pertinent to the application
shall be transmitted to the county council for final action.
(2) Public hearing. Before enacting an amendment to this article, the county council or planning
commission shall hold a public hearing thereon; notice of the time and place of which shall be
published in a newspaper of general circulation in the county at least 15 days in advance of the
scheduled public hearing date.
(Ord. No. 1999-14, § 3.8, 4-4-2000)
Sec. 32-99. Official Clemson-Oconee County Airport height limitation map amendments.
(a) If changes are made in district boundaries or other matter portrayed on the Official Clemson -Oconee County
Airport height limitation map, such changes shall be entered on t he Official Clemson-Oconee County Airport
height limitation map promptly by the planning director within 15 days after the amendment has been
approved by the county council. No amendment to this article which involves information portrayed on the
Official Clemson-Oconee County Airport height limitation map shall become effective until after such change
has been made on such map.
(b) No changes of any nature shall be made to the Official Clemson-Oconee County Airport height limitation map
or information shown thereon except in conformity with the procedures set forth in this article. Any
unauthorized change of whatever kind by any person shall be considered a violation of this article and
punishable as provided by law.
(c) Regardless of the existence of purported copies of the Official Clemson-Oconee County Airport height
limitation map, copies may from time to time be made or published. The Official Clemson -Oconee county
Airport height limitation map, which shall be located in the planning director's office , shall be the final
authority as to the current status of land and water areas, buildings, and other structures in the county.
(Ord. No. 1999-14, § 3.9, 4-4-2000)
Secs. 32-100—32-130. Reserved.
ARTICLE IV. COMMUNICATION TOWERS4
4Cross reference(s)—Utilities, ch. 34.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 28 of 111
Sec. 32-131. Authority of article provisions.
The authority to regulate communication towers in the county is found in the South Carolina Code of Laws,
Title 6, Chapter 29.
(Ord. No. 1999-14, § 4.1, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Sec. 32-132. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them
in this section, except where the context clearly indicates a different meaning:
Antenna means a device, dish, or array used to collect or radiate electromagnetic waves for the purpose of
transmitting or receiving telecommunications signals.
Board means the county zoning board of appeals.
Communication tower means a tower, pole, or similar structure that supports or functions as a
telecommunications antenna; that is constructed above ground level at a fixed location; that is operated for
commercial purposes; and that is either self-supporting, guyed, or mounted on a building or structure.
Height (of a communication tower) means the distance from the base of the communication tower, as
measured from the average original, unimproved elevation of the finished grade upon which the communication
tower is constructed to the highest point of the communication tower.
Performance standards means performance zoning as authorized by S.C. Code 1976, § 6-29-720(C) et seq.
Stealth tower means a communication tower designed and installed in a manner such that the antenna,
supporting apparatus and associated structures are aesthetically and architecturally complimentary and
appropriate with regard to an existing structure or immediate environment in which the communicatio n tower is
located. Examples include, without limitation, church steeples, bell towers, flagpoles, etc.
Telecommunications (as defined in the Federal Telecommunications Act of 1996) means the transmission,
between or among points specified by the user, of information of the user's choosing, without change in the form
or content of the information as sent and received.
(Ord. No. 1999-14, § 4.2, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Cross reference(s)—Definitions generally, § 1-2.
Sec. 32-133. Communications tower and antenna permitted.
(a) Determination by planning director or his designated staff representative (collectively "director"). All
applications for tower placement must be submitted to the director for review. Applications must be
complete and shall include all of the materials required by this article (application requirements) and must
meet all applicable requirements and/or conditions in this article before an application will be processed.
Incomplete applications will be returned to the applicant. Under the following circumstances, the director
may administratively approve applications for placement of towers and associated antennas:
(1) As a communication tower and/or antenna in any district co-located on existing towers or structures.
(2) As co-locations on existing electric utility company transmission line towers (such as Duke Powe r
Company towers) which increase the height of the towers by no more than 20 feet.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 29 of 111
(3) As an individual communication tower and associated antennas that do not exceed 75 feet in total
height.
Applications approved by the director must comply with all oth er requirements of this article. The director
may refer any application to the board for final review and approval as a special exception.
(b) Special exceptions granted by the board. Other than as permitted by section 32-133(a), communication
towers are permitted in the county for use only as a special exception. Applications for tower construction
are subject to review and approval by the board. Priority in approving additional telecommunications
facilities in the county shall be given to co-location on existing towers or structures, including electric utility
company transmission line towers.
Only when these possibilities have been exhausted or when it can be demonstrated by an applicant that the
alternatives are not technically feasible to provide adequate coverage for the county, or when it can be
documented by the applicant that the cost of the proposed lease for a site or location is more than 20 percent
above the prevailing rate of leases in comparable metropolitan statistical areas (M.S.A.) in the southeast, shall
other sites be considered for approval. Communication towers approved by the board in all districts, as defined in
O.C. Code § 38-10.7, shall be encouraged as stealth designs. At the discretion of the board, communication towers
may be required to be constructed as a stealth design depending on the impact of the tower on the surrounding
area.
(c) Appeals to the board. Whenever there is an alleged error by the director in an order, requirement, decision,
or determination, an applicant may request a hearing before the board. The board has the authority to
correct, reverse, or uphold the decision of the director.
(d) Time limit for determination. Failure of the director to act within 45 days from the date of the submission of
a properly completed application, unless extended by mutual agreement, may be considered by applicant to
be a denial of a permit and may be appealed to the board.
(e) Co-locations. Co-locations on existing communication towers or other structures such as existing electri c
utility company towers which do not increase the height of the existing communication tower or structure
are strongly encouraged. Co-locations, construction of freestanding structures (such as monopoles) which
are located within the footprint of the existing tower or reconstruction of existing towers, any of which
increase the height of the existing tower by more than 20 feet may be approved by special exception if they
do not exceed the total tower height permitted in section 32-136. All new towers shall be designed to
accommodate the principal provider and at least two additional carriers. At the discretion of the board, new
stealth towers shall also be designed to accommodate additional carriers. The county, prior to final approval,
must be satisfied that the communication tower makes reasonable accommodations for an additional user.
The applicant shall make unused tower space available at fair market value.
(Ord. No. 1999-14, § 4.3, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016; Ord. No. 2018-21, § 1(Att. A), 8-21-
2018; Ord. No. 2019-11, § 1, 6-4-2019)
Sec. 32-134. General requirements.
(a) Illumination. Communication towers shall be illuminated only as required by the Federal Communication
Commission (FCC) and/or the Federal Aviation Administration (FAA).
(b) Color. Communication towers shall only be painted with a gray, non -reflective paint unless otherwise
required by state or federal regulations.
(c) Signs. A sign, two square feet in size which includes the names of the companies operating the equipment
and a phone number for emergencies shall be displayed in a visible location on or near the communi cation
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 30 of 111
tower. This sign shall be in addition to any signage requirements set by state and federal regulators. No
commercial advertising of any type may be attached to a communication tower.
(d) Removal. A communication tower which use has been discontinued for a continuous period of one year, shall
be removed within 120 days of the date of the end of such period, unless a use agreement is maintained
with the landowner. Companies must notify the county within 30 days if telecommunications cease
operations at a tower or antenna. All structures, fencing, screening and other improvements must be
removed, and the site must be returned to its original condition at the company's expense.
(e) Security. For towers greater than 75 feet, self-supporting freestanding communication towers, and
associated structures shall be appropriately secured by means of a wall, fence, or other device at least eight
feet in height and installed an appropriate distance from the outer edge of the communication tower at all
points (collectively "security fencing").
(f) Screening. For towers greater than 75 feet, the purpose of this subsection is to establish control for the visual
quality of communication towers from the ground level. A communication tower, as pertains to this
subsection, includes the tower, the land, and everything within the required security fencing including any
other building and equipment. The screen shall be a minimum depth of ten feet of land surrounding the
tower except for one service access. An appropriate plant material screen shall be evergreen plants of a
quality and planted in accordance with the standards of the American Nurserymen Association that are
indigenous or native to the county area. Such plantings shall be appropriately spaced and of such a size so as
to achieve a dense screen with a minimum height of six feet within a three-year period from erection of a
tower. Additional screening with deciduous or evergreen trees is desirable and encouraged. Existing trees
shall be preserved unless a waiver has been granted by the director to selectively cut specified trees. If in
extreme or unusual situations and where it is proven impossible to properly construct the plant material
screen, the director may grant permission to construct the security fence as a solid masonry wall, either brick
or stucco-type finish, with a minimum height of six feet above ground level and constructed in accordance
with applicable construction codes. A certificate of occupancy shall not be issued by the county codes
department until the required planting is completed. When the occupancy of a structure is desired prior to
the completion of the required planting, a certificate of occupancy may be issued only if the owners or
developers provide to the county a form of surety satisfactory to the county attorney and in an amount
equal to 125 percent of the costs of the remaining plant materials, related materials, and installation (with
the costs agreed to by the director). The form of the surety shall be in conformity with the land development
regulations for the county. All required plantings must be installed and approved by the first planting season
following issuance of the certificate of occupancy or the bond will be forfeited to the county. The owners and
their agents shall be responsible for providing, protecting, and mainta ining all required plant material in
healthy condition, replacing unhealthy or dead plants within one year or by the next planting season,
whichever comes first. Replacement material shall conform to the original intent of the approved plan.
(g) Tower wind load. The communication tower shall be designed to withstand winds in accordance with
ANSI/EIA/TIA 222 (latest revision) standards based on the wind load presented by antenna, feedlines, and
other associated hardware to be supported by the communication tower. Certification from a structural
engineer registered in the state shall constitute proof that such standard has been met.
(h) FCC authorization. The owner of the antenna and transmission/reception equipment to be installed on the
communication tower shall possess either a valid FCC license/construction permit or a statement
establishing FCC compliance for the proposed operation.
(i) Design for multiple use. A new communication tower shall be designed to accommodate additional antennae
as provided for elsewhere in this article.
(j) Safety codes. A communication tower shall comply with all applicable health, nuisance, noise, fire, building,
and safety code requirements.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 31 of 111
(k) Distance between towers. A proposed communication tower in excess of 100 feet shall not be permitted
within 1,300 feet of an existing communication tower in excess of 100 feet in height, unless the applicant
certifies to the board that the existing communication tower does not meet applicant's structural
specifications and applicant's technical design requirements, or that a co-location agreement could not be
obtained.
(l) Application of county land use regulations. Land development regulations and other performance standards
shall apply to the use, unless otherwise provided in this article.
(m) Minimum setbacks. A communication tower (not including guy anchors) over 75 feet must be, at a minimum,
setback as follows:
(1) A distance equal to the total height of the communication tower from all property lot lines.
(2) A distance equal to the total height of the communication tower from the nearest point of any
structure meeting minimum standards for human occupation as put forth in applicable building codes
adopted by the county.
(3) A distance equal to the total height of the communication tower from any properties containing
churches, schools, colleges, children's homes and shelters, hospitals and nursing homes; except that
communication towers which meet the definition of stealth tower in section 32 -132 may be permitted
by special exception on these properties.
(4) A distance equal to the total height of the communication tower from the right -of-way of all streets
and roads.
(5) A communication tower may not be sited (1) within a distance equal to 250 feet of the boundary of a
historic district; (2) on or within 250 feet of a structure that is a designated a National Historic
Landmark or that is listed in, or eligible for listing in, the National Register of Historic Places; or (3) on
or within property that is the subject of a pending complaint alleging an adverse effect on a historic
property.
All guy cables and anchors must be set back at a minimum of 20 feet from all lot lines and habitable
structures.
Variances may be granted from the requirements of subsections (1) and (2) upon submission of a properly
prepared engineered fall zone design/construction document(s).
(Ord. No. 2001-14, § 1, 7-10-2001; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Sec. 32-135. Additional requirements for location near the county airport.
(a) With the exception of towers for aeronautical purposes, in no case may a communication tower penetrate
any imaginary surface, as described in chapter 14 of the Code of Federal Regulations, Federal Aviation
Regulation (FAR) Part 77, associated with existing or proposed runways at any publicly owned airport. All
communications towers located within the first 12,000 feet of the ap proach surface of an existing or
proposed runway at such facility, or within the horizontal surface associated with such runways as described
in FAR Part 77, shall be lighted. Such towers shall be illuminated by strobe lights during daylight and twilight
hours, and red lights during nighttime hours.
(b) A copy of any plans whereby a communication tower will be located within such 12,000 feet area shall be
provided by the applicant to the county airport manager and the director for comment. Any comments sha ll
be made within ten days of delivery to such manager with a copy to the director and the applicant. Prior to
issuance of a building permit, the applicant shall provide documentation to the director that the proposed
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 32 of 111
communication tower has been reviewed by the Federal Aviation Administration (FAA), if so required, and
that a finding of no hazard to air navigation has been determined.
(Ord. No. 1999-14, § 4.5, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Sec. 32-136. Maximum height of freestanding communication towers.
The maximum height of freestanding communication towers shall be as follows:
District1 Maximum Height
Residential Not exceeding 175 feet
Commercial Not exceeding 200 feet
Industrial/agricultural Not exceeding 250 feet
1 See section 38-10.
(Ord. No. 1999-14, § 4.6, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Sec. 32-137. Permitted height of building-mounted communication towers.
A communication tower shall not exceed 20 feet in height, as measured from the base of the communication
tower to the highest point of the communication tower, if mounted on a building or a ny structure other than a
freestanding or guyed communications tower.
(Ord. No. 1999-14, § 4.7, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Sec. 32-138. Application requirements.
The following information shall be submitted for all applications for approval of a communication tower:
(a) Structural specifications. Two copies of the specifications for proposed structure, including description
of design characteristics and material.
(b) Technical specifications. For each antenna to be installed:
(1) Manufacturer and model number.
(2) Frequency band used for transmitting and receiving.
(3) Effective radiating power.
(4) Mounting position above ground.
(5) A study demonstrating compliance with FCC RF exposure limits (all antennas).
(c) Site plan. Two copies of a site plan drawn to scale showing property boundaries, communication tower
location, communication tower height, guy wires and anchors, security fencing, screening, existing
structures, photographs or elevation drawings depicting typical design of proposed structures, parking,
fences, landscape plan, and existing land uses on adjacent property. A site plan is not required if
antenna is to be mounted on an approved existing structure. Prototypical drawings indicating various
types of equipment to be located on the communication tower may be submitted at the time of the
permit application. Identification of the owners of all antennae and equipment to be located on the
site. Other equipment may be added to the communication tower without additio nal permits or
inspections as long as electrical wiring is not required.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 33 of 111
(d) Location map. Two copies of a current map, or update for an existing map on file, showing geographic
coordinates of the communication tower, calculated coverage areas, facilities , location of existing
nearby (within three miles) communication towers, and proposed communication towers, serving
contiguous areas. An applicant may request that specific proprietary or confidential information be
withheld from the public record.
(e) Owner authorization. Written authorization from the site owner for the application.
(f) Visual impact analysis. A line of sight analysis showing the potential visual and aesthetic impact on
adjacent residential districts. For communication tower applications, balloon testing and computer
generated viewshed analysis/rendering to provide a visual representation of the proposed structure on
the proposed site, shall be provided as part of the application package by the applicant.
(g) Alternative to co-location or stealth design. Co-located or stealth designs shall be required unless
satisfactory documented evidence can be provided indicating that:
(1) The proposed antenna and equipment cannot be accommodated and function as required;
(2) The applicant's technical design requirements are such that without unreasonable modifications
they cannot function on any existing structure or communication tower under the control of
applicant; and
(3) The applicant has considered all available publicly-owned sites, and available privately owned
sites occupied by a compatible use, including all applicable sites or locations or a combination of
sites and locations as described under section 32-133(b) for priority of approval and the applicant
has demonstrated that for the reasons described in section 32-133(b) that these sites and/or
locations are unsuitable for operation of the facility under applicable state and federal
communications regulations, the applicant's technical design requirements and/or valid
economic reasons.
(h) Indemnity. The applicant must show by certificate from a registered engineer that the proposed facility
will contain only equipment meeting FCC rules, and must file with the director a written
indemnification agreement, on a form approved by the county. The applicant must also file with the
county proof of liability insurance or financial ability to respond to claims up to $1,000,000.00 in the
aggregate which may arise from operation of the facility during its life, at no cost to the county, in a
form approved by the county attorney.
(i) Application fees. All communication tower applications shall include a check made out to the county
treasurer in an amount to be determined by the director, based upon a schedule of fees enacted by the
county council. Additional fees may be imposed in order to offset the costs associated with processing
applications for special exceptions, appeals, or variances.
(Ord. No. 1999-14, § 4.8, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016; Ord. No. 2018-20, § 1(Att. A), 8-21-
2018)
Sec. 32-139. Special exceptions, variances and appeals.
(a) Special exception. Unless indicated otherwise, communications towers are permitted in the county only by
special exception, approved by the board, within the criteria of the performance standards ordinance. The
board shall conduct a public hearing on each request for a special exception. All public hearings shall be
advertised in a newspaper of general circulation in the county at least 15 days in advance of the hearing.
(b) Variance. An applicant may submit a request to the board for a variance from this or any other applicable
land use ordinance. The board shall hear and decide appeals for a variance from the requirements of the
performance standards ordinance when strict application of the provisions of the article would result in
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 34 of 111
unnecessary hardship. A variance may be granted in an individual case of unnecessa ry hardship if the board
makes and explains in writing a unique, exceptional and otherwise unusual circumstance as provided for in
general criteria for granting a variance in article I of this chapter. Special exceptions and variances, may be
applied for simultaneously and considered by the board simultaneously.
(c) Appeals. Applications for appeal shall be submitted through the director to the board. All appeals shall be
accompanied by copies of the original application, supporting maps and documentation and shall include a
detailed written summary of the alleged error or misinterpretation of this article by the director in not
granting approval to the original application. A copy shall be provided for each board member and the
director, and other copies as may be required by the director. Appeals shall be heard by the board within 45
days of submission of the completed application to the director.
(Ord. No. 1999-14, § 4.9, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Sec. 32-140. Additional criteria for evaluating special exceptions and variances.
(a) Application; conditions. All application requirements imposed by section 32-138 must be met.
(b) Setback requirements; additional conditions. The applicant must demonstrate that the proposed
communication tower location is sufficient to satisfy setback requirements and must sati sfy such other
additional conditions, if any, necessary to remove dangers to safety and to protect adjacent property.
(c) Residential service area. If location in a residential district, as defined in section 38-10.7 has been requested,
the applicant must show that the area cannot be adequately served by a facility placed in a nonresidential
district for valid technical reasons.
(d) Greenspaces. If location in a residential district has been requested, the tower shall not be located on land
designated for public recreational uses on the county land use plan.
(e) Priority of approval. If a location is requested which does not meet the requirements under section 32 -133(b)
for priority of approval the applicant must demonstrate that all alternative sites and locations or
combinations thereof provided for in section 32-133(b) have been considered by the applicant, and the
applicant has demonstrated that for the reasons described these sites and/or locations or combinations
thereof cannot adequately serve the area for valid technical or economic reasons and are unsuitable for
operation of the facility under applicable communications regulations.
(f) Denial on substantial evidence. The Federal Telecommunications Act of 1996 requires that a denial of a
permit be supported by substantial evidence. The board shall maintain a written record of all appeal
proceedings and shall maintain supporting documentation for any and all decisions.
(Ord. No. 1999-14, § 4.10, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Sec. 32-141. Annual report required.
All companies that operate or maintain ownership of communication towers in the county shall submit an
annual report to the county planning department no later than January 15 of each year. The report shall include a
description of all of the company's active and inactive facilities located in the county, co-locations of its own
equipment, co-locations of other companies using its facilities, and shall include telephone numbers and addresses
for company officials and maintenance personnel.
(Ord. No. 1999-14, § 4.11, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016; Ord. No. 2019-11, § 1, 6-4-2019)
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 35 of 111
Sec. 32-142. Technical assistance required.
The director (prior to issuing a permit) and the board (prior to issuing a permit by special exception or
deciding an appeal or request for variance) may make use of technical consultants to review applications and to
determine if the standards in this article are met. The permit applicant shall be required to bear the cost of the
required technical services. The director shall estimate any expenses and shall require payment with the
completed application. Additional expenses shall be invoiced by the county finance department to the applicant.
Amounts in excess of required fees and actual expenses shall be returned to the applicant.
(Ord. No. 1999-14, § 4.12, 4-4-2000; Ord. No. 2016-38, § 1(Exh. A), 1-17-2016)
Secs. 32-143—32-170. Reserved.
ARTICLE V. GROUP RESIDENTIAL DEVELOPMENTS5
Sec. 32-171. Authority of article provisions.
The regulations of this article are enacted pursuant to S.C. Code 1976, § 6 -29-310, et seq.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-172. Purpose of article.
The regulations of this article are intended to lessen the adverse impact of large -scale group residential
development on neighboring residential areas and to ensure the health, safety and general welfare of residents
and citizens of the county.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-173. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them
in this section, except where the context clearly indicates a different meaning:
Board means the board of zoning appeals (BZA), as defined in section 32-5.
Exempted residential facility means recreational summer camps, day facilities, and religious retreat facilities,
any of which do not provide for long-term stays of 30 days or more. Hospitals and nursing homes are exempted
from the requirements of this article.
Group residential facility means a public, private, or not-for-profit facility, which (i) provides a community
living environment for individuals, whether or not disabled under applicable law, requiring custodial care,
medical or therapeutic treatment, or specialized social services and (ii) that houses ten or more persons not
5Editor's note(s)—Exh. A of Ord. No. 2022-09, adopted April 19, 2022, revised, rewrote, and amended art. V to
read as herein set out. Former art. V pertained to the same subject matter, and derived from Or d. No. 2016-
06, adopted April 5, 2016; and Ord. No. 2019-11, adopted June 4, 2019.
State law reference(s)—Government entities subject to zoning ordinances; exceptions, S.C. Code 1976, § 6 -29-770.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 36 of 111
related by blood, marriage, or adoption in a residential or dormitory environment for a period of 30 days or
more per year. Residential and that is one of the following:
(1) A community living facility for persons requiring custodial care, medical or therapeutic treatment centers
(RTCs) are included in this definition. Proposed group, or specialized social services, including a residential
facilities must show compliancetreatment center;
(2) A fraternity house or sorority house providing communal residential accommodations for members or
affiliates of a recognized fraternity or sorority.
A facility shall comply with all applicablestate requirements of the State of South Carolina.applicable to that facility.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-174. Group residential facilities permitted by special exception.
Persons desiring to build or expand a group residential facility as defined by this article shall make an
application through the planning director, or designee, to the board providing information required by this article.
Development or expansion of a group residential facility may commence only with the approval of the board as a
special exception after a public hearing in accordance with section 32-5.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-175. Review of application by planning director, or designee.
All applications for development or expansion of residential group facilities must be submitted to the county
planning director, or designee for review. Applications must be complete and shall include all of the materials and
information required by this article (application requirements and sketch plan and preliminary development plans)
and must meet all applicable requirements and/or conditions in this article before an application will be processed.
Incomplete applications will be returned to the applicant. The planning director, or designee shall refer completed
applications to the board for final review and approval as a special exception. The planning director, or designee
shall act upon applications within 30 days of receipt, returning them for cause, or forwarding them to the board for
further action.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-176. Public hearing and approval by the board.
The board shall conduct a public hearing and shall review applications for compliance with the provisions of
this article, in particular with section 32-180, board criteria for granting a special exception and general criteria for
special exceptions in article I of this chapter. Development or expansion may proceed only as approved by the
board. Any changes in development or expansion plans as approved by the board shall require a new application.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-177. Appeals.
Whenever there is an alleged error by the planning director, or designee in an order, requirement, decision,
or determination, an applicant may request a hearing before the board in accordance with the provisions of
section 32-5. Appeals of the decisions of the board may be made to the county circuit court in accordance with the
provisions of section 32-5. Appeal hearings shall be advertised and reasonable fees may be charged in accordance
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 37 of 111
with article I of this chapter. Appeals of the decisions of county council may be made to the county circuit court in
accordance with the South Carolina Code of Laws.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-178. Application requirements.
Applications for development or expansion of group residential facilities must include the following:
(1) A complete description of the name and purpose of the proposed facility;
(2) A complete list of the names, addresses, and phone numbers of board members, owners and investors,
as applicable;
(3) A copy of aany state license, or application for a state license to , required by law for operation of the
state department of social services to operate aproposed group residential facility;
(4) State tax identification number or tax exemption certification; and
(5) Two copies of a preliminary development plans and a sketch plan displaying the physical and relative
layout of the facility as outlined by section 32-179.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-179. Sketch plan and preliminary development plans.
A sketch and development plan will be required for all proposed group residential developments. The sketch
plan shall be drawn at an approximate scale of not less than a scale of 200 feet to one inch and shall include a
vicinity map showing the relationship of the proposed development to the surrounding areas. The planning
director, or designee may waive some of the following sketch plan elements on applications for minor
modifications and additions to existing facilities; otherwise, all sketch plan s ubmittals shall include the following in
sketch and narrative form:
(1) An accounting of total acreage in the tract and any proposed subdivision of parcels;
(2) Arrangement, shape, dimensions, and area of proposed development;
(3) Location of existing property lines, easements, road rights-of-way, buildings, or other public ways
adjoining the tract to be developed;
(4) Alignment, right-of-way width, and clarification of proposed roads;
(5) Topography by contour at intervals of not more than ten feet (as from USGS quad sheets);
(6) Map scale, north arrow, and date;
(7) Name/address/telephone number of legal owner or agent and the professional (surveyor or engin eer)
who will undertake detailed layout and improvements design;
(8) Location of watercourses and land subject to flooding based on a 100 -year frequency flood;
(9) The existing and proposed uses of land throughout the development;
(10) Proposed method of water supply and wastewater treatment and other utility services;
(11) The proposed name of the development;
(12) The owner/developer shall submit a sketch plan of this entire tract even though the subdivider's
present plans call for the actual development of only a part of the property.
Created: 2026-05-07 10:21:29 [EST]
(Supp. No. 55)
Page 38 of 111
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-180. Board criteria for granting a special exception.
The board criteria for granting a special exception shall be as follows:
(1) Traffic flow from the facility shall not present a danger to local residents, motorists and pedestrians.
(2) Noise, lighting, and activities carried out on the premises of the facility shall not present a nuisance to
local residents.
(3) The residents of the facility shall not present any potential danger to local residents.
(4) The residents of the facility shall reside in a safe and healthy environment.
(5) The proposed development is in compliance with the other provisions of this chapter.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-181. Reasonable accommodation requests.
Oconee County Council is authorized to grant reasonable accommodations under the Federal Fair Housing
Act, the Americans with Disabilities Act of 1990, the Rehabilitation Act of 1973, and the South Carolina Fair
Housing Law, as amended, under the circumstances set forth in this section.
Any person who requires a reasonable accommodation, because of a disability, in the application of a land
use or zoning law, rule, policy, or practice that may be acting as a barrier to equal opportunity to housing
opportunities, or any person or persons acting on behalf of or for the benefit of such a person, may request such
accommodation.
An application for a reasonable accommodation, which shall be in writing on a form prescribed by the county
and available from the county planning department, shall be filed with the county administrator and the county
planning director. At a minimum, the application shall contain:
(1) The applicant's contact information (name, mailing address, telephone number, fax number, and email
address);
(2) The contact information for the owner(s) of the property (if different from the applicant);
(3) The address of the property at which the reasonable accommodation is requested;
(4) A full description of the reasonable accommodation requested;
(5) A detailed statement explaining how and why the request meets the standards for a reasonable
accommodation as set forth in this section;
(6) The notarized signature of the applicant and property owner(s) (if different from the applicant); and
(7) The information required under sections 32-178 and 32-179 of this article, provided the requirement of
submitting such information is not the subject of the reasonable accommodation request.
No filing fee shall be required for the application.
County council shall consider the proposed reasonable accommodation and shall decide the request upon a
majority vote of the members present.
County council shall grant a reasonable accommodation in relation to any provision of this article and related
law, if county council finds that the applicant has demonstrated, by the greater weight of the evidence, that the
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 39 of 111
proposed reasonable accommodation is both reasonable and necessary, in accordance with applicable law and the
following:
(1) "Reasonable": an accommodation will be determined to be reasonable if it would not undermine the
legitimate purposes and effects of existing land use or zoning regulations, and if it will not impose
significant financial and administrative burdens upon the county and/or constitute a s ubstantial or
fundamental alteration of the county's zoning or land use ordinance provisions; and
(2) "Necessary": an accommodation will be determined to be necessary if it would provide direct or
meaningful amelioration of the effects of the particular disability or handicap and would afford
disabled or handicapped persons equal opportunity to enjoy and use a dwelling, including public and
common spaces, in the county.
After county council has approved a reasonable accommodation request, the applicant sh all follow all
applicable land use ordinances, procedures, and regulations for the approval of any permits, certificates, or other
approvals required in order to proceed with development or use of the property. All orders, decisions,
determinations, and interpretations made by administrative officers under those procedures shall be consistent
with the reasonable accommodations granted by county council.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Sec. 32-182. Building permits and certificate of occupancy.
Building permits and certificate of occupancy shall not be issued until or u nless authorized by the planning
director, or designee and the proposed development is in compliance with the requirements of this article and the
standard building codes as adopted by the county.
(Ord. No. 2022-09, § 1(Exh. A), 4-19-2022)
Secs. 32-183—32-210. Reserved.
ARTICLE VI. LAND DEVELOPMENT AND SUBDIVISION REGULATIONS6
Sec. 32-211. General provisions.
(a) Short title. This article shall be known and cited as the "Oconee County Land Development and Subdivision
Regulations Ordinance."
(b) Authority. These land development and subdivision regulations are adopted under authority granted by S.C.
Code 1976, tit. VI, ch. 29, § 6-29-1120 et seq.
6Editor's note(s)—Ord. No. 2008-20, adopted Dec. 16, 2008, repealed Ch. 32, Art. VI, Div. 1, §§ 32-211—32-234 and
Div. 2, §§ 32-311—32-316, in its entirety. Arts. 1—16 of said ordinance enacted new provisions to read as
herein set out. Prior to amendment, Art. VI pertained to subdivisions and land development and derived
from Ord. No. 2002-05, §§ 6.1.1, 6.1.2, 6.2.1, 6.3—6.23, adopted May 7, 2002; Ord. No. 2004-14, adopted
Jun. 15, 2004; Ord. No. 2006-07, §§ 7.1—7.4, adopted May 1, 2006 and Ord. No. 2006-20, §§ 1(6.3), 2(6.3),
3(6.5(6.5.13), 4(6.7(6.7.14), adopted Aug. 15, 2006 and Ord. No. 2008-19, adopted Dec. 16, 2008.
State law reference(s)—Authority to regulate subdivisions and land development, S.C. Code 1976, § 6 -29-1110 et
seq.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 40 of 111
(c) Jurisdiction. These regulations shall apply to the development and subdivision of land within the
unincorporated areas of the county as now or hereafter established and any incorporated municipality
whichthat contracts with the county for these regulations to be administered within such municipality.
Regulations contained within this article that apply to the construction and maintenance of roads shall apply
to all roads and drainage structures, whether public or private, constructed within any unincorporated area
of the county and municipalities contracted with the county for their administration of these regulations.
Regulations contained within this article that apply to the construction and maintenance of roads,
appurtenances or drainage structures shall apply to all public. Private drives, private roads, and private
roads, drives and driveways in the unincorporated areas of the county; also included shall be all
municipalities contracted with the county to administer these regulations. These regulations shall not apply
to those roads completed,roadway easements serving development subject to this article are governed by
this article. County roads and roads proposed for county acceptance are governed by chapter 26 as provided
therein. Approval under construction, or approved (accepted) by the county prior to adoption of this article
by county council.does not constitute acceptance of a road or dedication into the county road system. In the
event thatof a regulation in this article conflicts with any otherconflict between applicable county
regulationregulations, the more stringentrestrictive standard shall apply. applies, subject to state law.
(d) Purpose. The purpose of this article is to protect and promote the public health, safety and general welfare
of the citizens of the county, South Carolina, providing for the harmonious, progressive, and orderly
development of land. These regulations are established for the following specific purposes, among others, as
provided for in the South Carolina Local Government Comprehensive Planning Enabling Act of 1994 (S.C.
Code 1976, § 6-29-1120, et seq.):
(1) To encourage the development of an economically sound and s table county;
(2) To assure the timely provision of required streets, utilities, and other facilities and services to new land
developments;
(3) To assure the adequate provision of safe and convenient traffic access and circulation, both vehicular
and pedestrian, in and through new land developments;
(4) To assure the provision of needed public open spaces and building sites in new land developments
through the dedication or reservation of land for recreational, educational, transportation, and other
public purposes; and
(5) To assure, in general, the wise and timely development of new areas, and redevelopment of previously
developed areas in harmony with the county's comprehensive plan.
(Ord. No. 2008-20, Art. 1(1.1—1.4), 12-16-2008)
Sec. 32-212. Definitions.
When used in this article, the following words and terms shall have the meaning indicated. Words and terms
not herein defined shall have their customary dictionary definitions. The term "shall" is mandatory. When not
inconsistent with the content, words used in the singular number include the plural and those used in the plural
number include the singular.
Affordable housing means a housing unit for which the total annual cost of a sale (including mortgage,
amortization, taxes, insurance, and condominium and association fees) constitutes no more than 28 percent of the
annual household income for a household earning no more than 80 percent of th e area's median income, by
household size, as reported by U.S. Housing and Urban Development (HUD); or for a rental housing unit, the total
annual cost for rent and utilities can constitute no more than 30 percent of the annual household income for a
household earning no more than 80 percent of the area median income, by household size, as reported by HUD.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 41 of 111
Apartment complex means a building or portion thereof, other than a hotel, divided into more than two
dwelling units which are arranged in such a manner as to be used for lodging by separate households.
Applicant means the developerowner or an authorized agent of the developer who applies for a subdivision
review under this article. The application shall identify the owner and is designated asinclude written authorization
for an agent to act on the primary contact for said subdivision. owner’s behalf.
Average daily traffic means the number of trips made by vehicles that will be utilizing a road, intersection or
other reference point in a 24-hour period.
Block means a parcel of land entirely surrounded by roads or highways, railroad rights -of-way, waterway, or
combination thereof.
Building footprint means the area included within surrounding exterior walls, or exterior walls and fire walls,
exclusive of courts.Buildable lot means an individual dimensional parcel of a size and shape capable of supporting a
dwelling structure while meeting all setback and anticipated waste removal requirements. Any parcel which
reasonably could qualify will be deemed a buildable lot.
Building footprint means the horizontal area occupied by a building, measured to the exterior face of its
exterior walls at grade, together with any portion of an upper floor that extends beyond the exterior walls below.
Open courts, uncovered patios, uncovered decks, steps, and similar uncovered features shall not be included in the
building footprint. Exclusion from the building footprint does not exempt any structure or projection from
applicable building setback requirements.
Building line (also referred to as "building setback line") means a line beyond which no part of the structure
of any building shall project, unless specifically permitted in this Code of Ordinances, with the exception of
subsurface projection of footings, measured perpendicular to the property line. This includes, but is not limited to,
the building, eaves, porches, decks, chimneys, bay windows, and fire escapes.
Building permit means a document or certificate issued by the county authorizing construction, enlargement,
alteration, moving of, or demolition of a building or structure, or the placement of a mobile home (manufactured
housing). home.
Caliper means the diameter of a nursery tree trunk measured six inches above ground for the installation -
size requirements of this article.
Cleared or grubbed areas means the area within the road right-of-way that is cleared of vegetation.
Comprehensive plan means any legally adopted part or element of the Comprehensive Plan of Oconee
County, South Carolina. This plan may include, but is not limited to, the community facilities, population, economic
development, land use, natural resources, and housing elements.
Condominium complex means a building or group of buildings containing dwelling units which are
individually owned. The structure, common areas, and other facilities are owned by the developer and/or the
owners of the individual units on a proportional or individual basis.
Contiguous parcels under common ownership means two (2) or more parcels that share a common boundary
or are otherwise contiguous and are owned, in whole or in part, by: (1) the same person or persons; (2) the same
legal entity, including a corporation, limited liability company, partnership, trust, estate, or other legally recognized
entity; or (3) different legal entities having substantially identical ownership, as evidenced by public records or
documentation submitted as part of a subdivision application. For p urposes of this chapter, contiguous parcels
under common ownership shall be considered collectively only where expressly provided herein
County engineer or designee or designee means the County official responsible for engineering review or a
designee authorized to perform the particular technical review. This term is distinct from project engineer.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 42 of 111
County road specifications means the county-adopted, titled and dated technical specifications applicable to
materials, installation, compaction, testing, and workmanship, including express county modifications to any
external standard.
Crosswalk means an areaa designated pedestrian crossing across a roadway with a minimum width of ten or
moresix feet dedicated for public use, and intended for pedestrian access to adjacent land area.
.Cul-de-sac means a local road (minor) with one end open to traffic and the other end terminated with a
planned vehicular turnaround.
Cul-de-sac means a local road (minor) with one end open to traffic and the other end terminated with a
planned vehicular turnaround.
DBH means tree trunk diameter measured at breast height, four and one -half feet above ground.
Density means the number of dwelling units or lots per acre of land developed or used for residential purposes.
(1) Low density: Two or less dwelling units per acre.
(2) Medium density: From 2.1 to 6.0 dwelling units per acre.
(3) High density: Over six dwelling units per acre.
Developer means an individual, partnershipthe person or corporation (entity undertaking land development
or agent therefore) that undertakes the activities covered by these regulations. a subdivision, whether or not the
developer owns the land.
Development means anya manmade change to improved or unimproved real estate, including, but not
limited to: new homes, building structures, dredging construction, clearing, filling, grading, paving, or excavation
operations. A review requirement applies when the activity meets the particular land -development or subdivision
trigger stated in this article.
DHECSCDES means the South Carolina Department of Health and Environmental ControlServices.
Dwelling means a building or portion of a building arranged and/or designed to provide living quartersor
used for residential occupancy containing one or more families where each dwelling is provided with separate
kitchen and bathroom facilities. units.
(1) Single-family dwelling means a detached dwelling designed for or occupied exclusively by containing one
family dwelling unit on a single lot.
(2) Duplex means a building arranged or designed to be occupied bycontaining two families living
independently of each other on a single lot. dwelling units arranged, designed, or used for independent residential
occupancy.
(3) Group dwelling means a group of two or more principal residential structures built on a singleone lot,
parcel, or tract of land and designed for occupancy by separate families. , each containing one or more dwelling
units.
(4) Multiple-family dwelling means a building or series of buildings on the same parent parcel used or
designed as a dwelling place for containing three or more families living independently of each other, with the
number of families in residence not exceeding the number of dwelling units provided. dwelling units arranged,
designed, or used for independent residential occupancy, including apartment buildings or apartment complexes.
Townhouse units and student housing, as separately defined in this chapter, are not classified as multiple -family
dwellings solely by physical form.
Dwelling unit means one or more rooms connected together and constituting a separate, arranged,
designed, or used as a single independent housekeeping establishmentunit for one household, with permanent
provisions for cooking, eating andliving, sleeping, and physically set apart from any other rooms or dwelling units
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 43 of 111
in the same structure. cooking, and sanitation. The presence of an additional kitchen, kitchenette, bathroom, or
similar facility within a single-family dwelling does not, by itself, establish an additional dwelling unit unless the
space is arranged, designed, or used for independent residential occupancy.
Easement means a grant of one or more specific property rights by the property owner permitting a specific
use or uses to the public, a corporation, or another person or entity.
Easement, private roadway means an easement that grants access for all utility and roadway construction
and maintenance.
Easement, private roadway means a recorded property interest granting specified persons and their
successors the rights necessary for private vehicular access and for installation, inspection, repair, replacement,
drainage, and maintenance of the roadway and utilities. The easement instrument shall identify beneficiaries and
maintenance obligations and shall not convey county ownership or maintenance responsibility.
Exempt subdivision means a division qualifying for one of the informational exceptions stated within the
definition of subdivision in this section.
Flag lot means a lot shaped like a flag on a pole. The "flag" shaped area is situated behind another lot and is
the portion of a flag lot where structures may be located. The "pole" shaped area is the portion of the lot by w hich
vehicular access to the flag area from its adjoining road is located. (See chapter 38 for specific provisions
addressing flag lots.)
Flood means a temporary overflowing of water onto land that is usually devoid of surface water.
Floodplain means land areas adjoining a river, stream or watercourse which are subject to a one percent or
greater chance of flooding in any given year. These areas are specifically established by the Federal Emergency
Management Agency, according to the Flood Insurance Study for the county.
Full pond level means full pond level is 660 feet above mean sea level on Lake Hartwell, 800 feet above mean
sea level on Lake Keowee, and 1,110 feet above mean sea level on Lake Jocassee.
Half road means a road located so that a cross means section of its width lies on more than one parcel.
Lake means a considerable inland body of standing water.
Land development means the changing of land characteristics through construction, redevelopment,
construction, a subdivision into parcels, condominium complexescomplex, apartment complexescomplex,
commercial parkspark, shopping centerscenter, industrial parks, mobile park, manufactured-home parks, andpark,
or similar developmentsproject for sale, or lease, or any combination of owner and rental characteristics. . A
townhouse, condominium, or apartment project is subject to the applicable land -development review whether
units are rented or separately owned.
Landscape area means a portion of a site containing vegetation to remain after construction, including
natural areas, buffers, lawns, and plantings. Large-maturing tree, large-maturing shade tree, understory tree, and
screening shall have the meanings stated in section 38-12.2 when used in the landscaping, screening, and buffer
provisions of this article.
Lot means a single parcel or tract of contiguous land intendedexisting, created, or proposed as a separate unit for
transfer of ownership, or for building development, or bothof land, including a remainder parcel.
(1) Corner lot means a lot with frontage on at least two intersecting roads located at the point of
intersection.
(2) Lot depth means the mean horizontal distance between the front and rear lot lines.
(3) Double frontage lot means a parcel having frontage on two or more roads which is not located at any
intersection of such roads.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 44 of 111
(4) Lot width, unless indicated otherwise by context, means the straight -line distance between the points
where the front building line intersects the two side lot lines.
Minor subdivision means a minor subdivision is any subdivision of a parcel that is reviewed by the county that:
(1) Results in a total of no more than ten lots; and
(2) May or may not involve the construction of a private drive, private road, or public road.
Mobile home (Manufactured home (also referred to as a mobile home or manufactured housing unit) means
a detached, single-family dwelling designed for long-term occupancy, designed to be transported on its own axle
and wheels, arriving at the site in sections or as a complete dwelling unit, usually including major appliances and
furniture, and ready for occupancy. Removal of the wheels andor placement ofon a permanent foundation does
not change the mobilemanufactured home classification. A travel trailer is not a mobilemanufactured home.
Manufactured-home park means a land development on commonly owned or operated land containing
multiple sites for manufactured homes offered for occupancy without division of the sites into separately owned
subdivision lots. Subdivision of separately owned lots is classified under the subdivision definitions of this article.
Multi-family housing means a building or buildings designed to be occupied by two or more households living
independently of each other, with the number of households in residence not exceeding the number of multiple-
family dwelling units provided. as defined in this section.
Natural vegetative buffer means plants, trees, and vegetation that normally survive in the county without
the need of fertilizers, herbicides, or pesticides.
Oconee County road means any paveda road, gravel road, dirt in the Oconee County road system under
section 26-6 or a legacy County road or bridge thatwhose status is owned and/established under section 26-11 or
regularly maintainedother applicable law. The separate rudimentary-road program is governed by the county and
considered partsection 26-12. Approval of the county road system. a plan or plat alone does not establish County-
road status.
Open space site means a tract of land provided in residential subdivisions to meet the local recreational
needs and desires of residents. Such tracts may include play areas, parks, natural woods, open fields and meadows
and areas of scenic beauty.
Owner's engineer means an engineer registered and in good standing with the South Carolina Board of
Registration for Professional Engineers and Land Surveyors who is the agent of the owner of the land proposed to
be subdivided, or which is in the process of being subdivided.
Owner's land surveyor means a land surveyor registered and in good standing with the South Carolina Board
of Registration for Professional Engineers and Land Surveyors who is the agent of the owner of the land proposed
to be subdivided, or which is in the process of being subdivided.
Owner means the person or entity holding title to the property that is the subject of an application. An
applicant or developer is not necessarily the owner.
Parent parcel means, for purposes of section 32-213(h), all contiguous parcels under common ownership as
they existed immediately prior to approval of the original minor subdivision.
Parking, off-street means an area adequate for parking an automobile with room for safely opening doors on
both sides, together with properly related access tospaces and associated maneuvering areas located outside a
public road right-of-way and provided for vehicles associated with a use or development. Such spaces shall have
lawful vehicular access and shall be arranged so that no maneuvering incidental to parking shalldoes not occur on
anya public road.
Perennial stream means any creek, river, or other watercourse that has flowing water year -round.
Person means any individual, corporation, company, partnership, organization, utility and/or municipality.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 45 of 111
Planning commission means the county planning commission and planning staff specifically authorized to
carry out certain functions on its behalfOconee County Planning Commission.
Plat means a map or drawing which is an accurate graphical representation of a subdivider's plan for a
subdivision.Plat means a survey drawing for land division. A sketch plan depicts the concept; a preliminary plan
depicts the proposed development and construction; a final plat is the recordable survey instrument depicting the
approved lots and interests. An as-built plan is a separate engineering record of completed improvements .
(1) Sketch plan means a simple sketch of a proposed subdivision layout showing roads and other principal
features. The sketch plan is preparatory to the preliminary and final plats and may enable the
subdivider to save time and expense in reaching general agreement as to the form of the plat and the
objectives of these regulations.
(2) Preliminary plan (plat) means a drawing which shows the proposed layout of a subdivision in sufficient
detail to indicate its working ability in all aspects.
(3) Final plat (plan) means a drawing which shows the 'as built' layout of allrecordable survey instrument
depicting the approved lots and interests. An as-built plan is a separate engineering record of
completed road construction, public utilities, public facilities, and lots to be soldother improvements.
Potable water, also referred to as drinking water, means water used or from surface collection and/or
ground sources which is treated by a water company or utility to be soldlevels that meet state and federal
standards for human consumption.
Private driveway means a driveway that provides vehicular access and road frontage to not more than three
single-family residences.
Private drive means a privately owned and maintained right-of-way or an access within a private roadway
easement that specifically grants the right for utilities and all road work, that provides vehicular access and road
frontage to not less thanserving four and not more thanthrough ten single-family residentialbuildable lots.
counted in accordance with section 32-228.
Private driveway means a private vehicular access serving no more than three buildable lots counted in
accordance with section 32-228.
Private road means a privately-owned and maintained right-of-way that containsroadway within a private
roadway constructedeasement serving 11 or more buildable lots counted in accordance with these
regulationssection 32-228.
Private-road maintenance instrument means a recorded covenant, easement, or agreement binding the
owners and successors served by a private road and identifying the party respon sible for its inspection, repair,
replacement, drainage, signs, and related costs.
Project engineer means a professional engineer licensed in South Carolina and provides vehicular
accessretained by the owner, developer, or applicant to prepare, supervise, or certify engineering design or
construction required under this chapter.
Project land surveyor means a land surveyor licensed in South Carolina and road frontage to more than ten
single-family residential lots. retained by the owner, developer, or applicant to prepare or certify surveys, plats, or
other surveying work required under this chapter.
Public road means roads, avenues, boulevards, highways, freeways, lanes, courts, thoroughfares, collectors,
minor roads, cul-de-sacs and other waysa road, including the entireits public right-of-way considered, established
for public and both dedicated touse and accepted by the United States, the State of South Carolina, or the countya
municipality, or the County under applicable law. County-road design and eligibility for acceptance are governed
by chapter 26.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 46 of 111
(1) Arterial road means a major road with access control, channelized intersections, restricted parking, and
that collects and distributes traffic to and from minor arterials and from collector stree ts.
(2) Collector road means a road that typically exceeds 800 ADTs and has the primary purpose of
intersecting traffic from intersecting local road and handling movements to the nearest arterial road. A
secondary function is to provide direct access to abutting properties. A road that connects local access
roads to the highway systems major and high-speed arterial roads. The collector road provides both
land access service and traffic service within residential subdivisions.
(2) Collector road means a road whose primary function is to collect traffic from local roads and connect it
to the arterial road system. County-road design classification is governed by section 26-3(e).
(3) Local road (major) means a road in which the road typical number of average daily traffic (ADT) ranges
from 401 to 800 and contains two or more access points. The primary purpose is to provide access to
abutting properties and receiving traffic from minor local roads.
(4) Local road (minor) means a road in which the typical number of average daily traffic (ADT) ranges from
zero to 400 and has the primary purpose of providing access to abutting properties. This road normally
terminates in a cul-de-sac, loop or other turnaround, with no more than two access points.
Road right-of-way width means an easement within which utility installation, utility maintenance, road way
construction, and roadway maintenance shall occur according to means the standards put forth in these
regulations.
The following arewidth of the requiredapplicable public right-of-way or private roadway easement. Required
County road rights-of-way and minimum road widths allowable:
Arterial roads:
Right-of-way: 66 to 120 feet (as determined by the county engineer)
Road widths: 28 feet (as determined by the county engineer)
Collector roads:
Right-of-way: 66 feet
Road widths: 24 feet
Major local:
Right-of-way: 50 feet
Road widths: 22 feet
Minor local and/or service roads:
Right-of-way: 50 feet
Road widths: 20 feet
The above widths are driving travel-surface widths and exclude widths added by curb and gutter and/or
asphalt valleys. shall be governed by section 26-3(e). Private access dimensions shall be governed by section 32-
229. A private road classification does not establish eligibility for County acceptance.
Roadway means the constructed vehicular travel surface and associated shoulders, drainage, and
appurtenances within a public right-of-way or private roadway easement; ownership and maintenance status shall
be stated separately.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 47 of 111
Roadway design manual means the 2021 edition of the South Carolina Department of Transportation
Roadway Design Manual, including any express County modification adopted by ordinance, for private-road
geometric design under this article. A later edition shall not apply unless adopted by County Council.
Sanitary sewer means a constructed conduit connected with or as a sewer system for the carrying of liquids
and solids other than stormwaters to a sanitary treatment facility.
SCDES means the South Carolina Department of Environmental Services, the state agency that succeeded to
applicable environmental functions formerly administered by the South Carolina Department of Environmental
Services (SCDES). References in older permits, approvals, regulations, agreements, or other records to SCDES shall
be understood to refer to SCDES where the applicable function or authority was transferred to SCDES.
Setback means the required minimum distance between everya structure and the lot lines of the lot on
which it is located (applicable property line, road right-of-way, or private roadway easement. Front setbacks shall
be measured from the road right-of-way at the front of the lot ifedge of the road right-of-way projects over the
property line, and measured, not the edge of pavement; where frontage is on private access within a recorded
private roadway easement, measurement shall be from the edge of that easement. Where no such right-of-way or
easement exists, measurement shall be from the front property lines on the remaining portions of the property).
line. Applicable zoning setbacks and exceptions are governed by chapter 38.
Setback line means the line indicating the minimum distance permitted between the property line or road
right-of-way line, as applicable, and the building line.
Sketch plan See Plat (plan).
Storm sewer means a constructed conduit connected with or as a storm sewer system for the carrying of
stormwaters to a water source.
Stream means a flow of water in a channel or bed, such as a brook, creek or river.
Street. See Public road.
Student housing means residential development designed, approved, or operated principally for students in
which individual beds or bedrooms are rented separately or occupancy and management are otherwise organized
by individual bed or bedroom. A conventional dwelling unit rented as a whole unit is not student housing solely
because one or more occupants are students. A fraternity house or sorority house is regulated as a group
residential facility and is not student housing for purposes of this definition. Approved bed means a bed authorized
by the applicable land-use approval and shown on the approved plan.
Subdivider means any person, firm, corporation owner, agent, developer, or other legal entity who directly or
indirectly attempts to subdivide land within the jurisdiction of this article. See also "developer."
Subdivision means all divisions of a tract or parcel of land into two or more lots, building sites, or other
divisions for the purpose (whether immediate ofor future) of sale, lease, or building development; including all
divisiondivisions of land involving a new roadway or an alteration in an existing roadway. Also included are
instances in which the further division, relocation of lot lines, or the rearrangement (includi ng combinations of
lots) of any lot or lots within a subdivision previously approved or recorded according to law. The alteration of any
roadways or the establishment of any new roads within any subdivision previously approved or recorded according
to law. is also included. A subdivision can include townhouses, condominium complexes, apartment complexes
and, multi-family housing, and student housing.
The following exceptions are included within this definition only for the purpose of requiring that the loc al
planning agency be informed and have a record of the subdivision:
(1) The combination or recombination of portions of previously platted lots where the total number of lots
is not increased and the resultant lots are equal to the standards of the count y;
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 48 of 111
(2) The division of land into parcels of five acres or more where no new street is involved and plats of
these exceptions must be received as information by the county planning commission which shall
indicate that fact on the plats; and
(3) The combination or recombination of entire lots of record where no new street or change in existing
streets is involved.
Terrain classifications means classification of terrain by grade ranges as follows:
Subdivision, major means any subdivision that does not qualify as an exempt subdivision or a minor
subdivision as defined in this chapter.
Subdivision, minor means a subdivision that:
(1) Results in no more than twenty (20) lots, including any remainder parcel;
(2) Does not require the construction of a new public road or private road as defined by this chapter; and
(4) Does not require the construction of shared stormwater or drainage infrast ructure intended to serve
more than one lot.
Townhouse means a building or group of buildings containing athree or more attached single-family
townhouse units.
Townhouse unit means an individual single-family dwelling unit or units constructed in a series or group of
attached within a townhouse that extends from foundation to roof, is separated from adjoining townhouse units
with property lines separating such units. by common walls, and has a setback area or public way on not less than
two sides, whether conveyed as a separate lot, condominium unit, or other ownership interest.
Traditional septic systems means a waste disposal system designed for the treatment and disposal of
domestic sewage by means of an onsite septic tank and soil absorption system utili zing a traditional drain field on a
single lot. All such systems are subject to the review and approval of the South Carolina Department of Health and
Environmental Control. Services.
Transfer or sale of lots means any means by which the ownership of a property changes hands; including, but
not limited to, the purchase ofor trade of a property subject to a mortgage, the assumption of a mortgage debt by
the property purchaser, and any exchange of possession of the property under a land sales contract or any other
land trust device.
Utilities means utilities shall consist of any and all utility services to a subdivision, including water, sewer,
storm sewer, electricity, telephone, cable television, gas, and sani tary sewerage, whether such utilities are
supplied by a private individual, private company, authority, or a governmental entity.
View lane means the portion of a natural buffer utilized and maintained by the property owner to enhance
observation of the lake and surrounding landscapes. Typically, the vegetation in the view lane is lower in height
and/or smaller in diameter than that found in the rest of the buffer.
Watercourse means any natural or artificial stream, river, creek, ditch, channel, canal, co nduit, culvert, drain,
waterway, gully, ravine, or wash in which water flows in a definite direction or course, either continuously or
intermittently, and has a definite channel, bed, and banks and includes any area adjacent thereto subject to
inundation by reason of overflow or floodwater.
Yard means a space that lies between the principal building or buildings and the nearest lot line or road right -of-
way, as applicable. The minimum required yard shall be unoccupied and unobstructed from the ground upwar d,
except as may be expressly permitted.
(1) Front yard means a yard situated between the front building line and the front lot line or road right -of-
way, as applicable, extending the full width of the lot.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 49 of 111
(2) Rear yard means a yard situated between the rear building line and the rear lot line extending the full
width of the lot.
(3) Side yard means a yard between the side building line and a side lot line that extends from the front
yard to the rear yard.
(Ord. No. 2008-20, Art. 2, 12-16-2008; Ord. No. 2024-23, §§ 1, 2(Exh. A), 10-15-2024)
Cross reference(s)—Definitions generally, § 1-2.
; zoning and landscape terms incorporated in this article, § 38-12.2. These cross-references apply only to the terms
and purposes expressly identified in this article.
Sec. 32-213. Requirements and standards.
(a) Unapproved plat prohibition. No plat of the subdivision of anyplat or land within the unincorporated areas of
the county as now or hereafter established, and any incorporated munic ipality which contracts with the
county for these regulations-development plan subject to be administered within such municipality,this
article shall be filed with or recorded with the Oconee County Register of Deeds until it has been approved
and signed by the county register of deeds until such plat shall have been submitted to and approved by the
county planning commission, planning director, or authorized designee according to thein accordance with
this article. Required improvements and permits remain subject to the applicable review procedures set
forth in this article. No. Approval of a plan or plat does not constitute County acceptance of a road or other
way shall be accepted or maintained, nor shall any water line, sewerage, road lighting or similar
improvements extended or connected, nor shall any permit be issued by any department of the county for
any or other improvements in any subdivision established hereafter which has not been approved by the
county planning department and met such requirements as prescribed by the county council.property
interest..
(b) Survey standards. Plats shall be prepared and survey data entered thereon in accordance with the most
recent adopted version of the "Minimum shall comply with the Standards Manual of the Practice ofManual
for Surveying in South Carolina" established by the South Carolina Board of Registration for Professional
Engineers and Land Surveyors provided that all elevations, S.C. Code of Regulations, chapter 49, article 4, as
applicable. Elevation information shall refer to Mean Sea Level Datum or other identify its vertical datum,
and any assumed datum shall be identified as such. The project land surveyor shall establish datum (a
minimum of [Z] assumed elevation with two and identify the benchmarks). required by the applicable
surveying standards.
(c) Subdivision name.
(1) All subdivision names must be submitted to the addressing office. Names must be easy to read and
pronounce. Proposed names may be rejected by the addressing office if in the opinion of emergency
response officials, pronunciation may impair an efficient response.
(2) Subdivision names that may be confused as homonyms (having the same or similar pronunciation) of
existing subdivision names shall not be approved.
(3) Names that are vulgar, ethnically offensive, or otherwise problematic shall not be approved.
(4) Subdivision names spelled in an unconventional, complex, or potentially confusing manner shall not be
approved.
(5) A subdivision shall be designated by only one name.
(6) Special characters, including numbers, are not allowed.
(7) No duplicates of existing subdivision names are allowed.
Created: 2026-05-07 10:21:30 [EST]
(Supp. No. 55)
Page 50 of 111
(d) Utilities. When utilizing a road right-of-way, all utility lines shall be buried at a depth of at least 36 inches.
Such lines shall be located a minimum of two feet outside the portion of the road to be surfaced to prevent
having to cut into the paved surface or reconstruct drainage structures to serve abutting properties. In order
to prevent future road cuts, utility stub-outs shall be added to all utility lines extending beyond the roadway
to each property line.
(e) Road signs. Road name signs shall be installed at all intersections with a subdivision. All other signs shall be
installed as required by and at the direction of the county engineer or his/her designee. All signage will be in
accordance with the Manual of Uniform Traffic Control. The developer shall be responsible for all costs of
road signage for private drives, private roads, and proposed county roads (at a cost determined by resolution
of county council from time to time) prior to acceptance of road by the county. Any person who shall willfully
or maliciously damage, deface, remove or otherwise tamper with a sign erected by a subdivider or the
county designating the name of any county road shall be guilty of a misdemeanor. In addition thereto, such
person shall be liable to the county for the cost incurred by the county as a result of said criminal acts.
(e) Road names and signs.
(1) Road names. Proposed road names shall be submitted for approval under chapter 26, article II, at the
Preliminary Plan stage, where a Preliminary Plan is required. Required road names shall be approved
before final subdivision approval. Assigned addresses required under section 26 -108 shall be obtained
before final subdivision approval.
(2) Road signs. The developer shall install and pay for road-name signs required for private drives and
private roads under section 26-106 before final approval. A required load-limit sign may be
documented by dated photographs and the project engineer’s cert ification identifying its location and
content; no separate County visit is required solely to observe that sign. Sign requirements for a road
proposed for County acceptance remain subject to chapter 26.
(f) Family transfers. When no consideration, other than a nominal monetary amount and love and affection, is
paid to the grantor of subdivisions resulting from Transfers to family transfersare considered to fall within
the scope of an exempt subdivision, as defined by this section of this article,below, regardless of sum
involved, and to which the following shall apply:
(1) Subdivision of parcels that results from the conveyance of parcels deeded by parents to children,
children to parent, sibling to sibling, grandparents to grandchildren or grandchild to g randparent, and
does not involve the construction or extension of any road, bridge, or drainage structure to provide
access to interior lots, and does not involve the creation of any new drainage easement, shall be
received as information only and approved administratively by the planning director.
(g) Minor subdivision. (Reserved). review and approval.
(1) Applicability. The provisions of this subsection shall apply to all subdivisions meeting the definition of a
minor subdivision contained in this chapter. Minor subdivisions shall be reviewed administratively and
shall not require review or approval by the planning commission.
(2) Submittal. An applicant proposing a minor subdivision shall submit a final plat to the planning
department. The plat shall be prepared and sealed by a land surveyor licensed in the State of South
Carolina and shall contain all information required by this chapter.
(3) Review. The planning director or designee shall review the final plat for completeness and compliance
with t
Text truncated. Open the original for the full document.
Source: Oconee County website. First collected Nov 14, 2026.