RecordWell Data

Backup Material

Oconee County · Oconee County · meeting of Apr 28, 2025 · Other

Open the original document More from Oconee County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

BOARD MEMBERS James Henderson, District I Jason Cox, District IV Gwen Fowler, District II Bill Gilster, District III John Eagar, At-Large Tim Mays, District V Wayne McCall, At-Large Meeting agenda April 28, 2025 6:00 pm 1. Call to order 2. Approval of minutes: 3/24/25 3. Brief statement about rules and procedures 4. Variance application VA24-000024 Wyatt Fullbright of Richland Creek is requesting a front setback variance of 22’ to allow for a new property line between the existing storage building and the existing shop building. TMS 252-00-01-005, with an address of 2036 Sandifer Blvd, Seneca SC 29678. 5. Variance application #VA25-000005 Leon Manley is requesting a 14’ reduction front setback for a metal building. TMS #086-00-02-149, with an address of 412 Whispering Pines Ln., Salem SC 29676. 6. Special Exemption application SE25-000001 Ryan Woods of Tower Engineering Professionals is requesting a new communications tower for Duke Energy. TMS #016-00-01-001, with an address of 100 Bad Creek Rd., Salem SC 29676. 7. Adjourn Oconee County Board of Zoning Appeals Council Chambers 415 South Pine Street Walhalla, S.C. 29691 www.oconeesc.com YouTube: “YourOconee” Staff contact 846-638-4218 planninginfo@oconeesc.com 1 Minutes 6:00 PM – March 24, 2025 Members in Attendance John Eagar Jim Henderson Wayne McCall Gwen Fowler Jason Cox William Gilster Staff Elise Dunaway James Coley- via phone ITEM 1 – Call to Order – Mr. Eagar called the meeting to order at 6:00 PM. ITEM 2 – Motion to approve the minutes from Feb 24, 2025 – Mr. Gilster made a motion to approve the minutes; seconded by Mr. Henderson. Mr. Eagar called for a vote. The motion passed 6-0. ITEM 3 – Brief statement about rules and procedures – Mr. Eagar outlined the proceedings of the meeting going forward: • Applicant will provide a presentation to state their request (5 minutes). • Staff will be asked to make any comments regarding the request. • The public is allowed to voice their approval or opposition to the proposed. Please do not repeat opinions that have already been stated into the record (3-5 minutes). • Applicant rebuttal • Board members will discuss in detail. • Voting ITEM 4. Variance application #VA25-000002 Luke Williams of Woodlands Engineering Company LLC is requesting 1. A reduction of the front setback from 25’ to 15’ at 4 locations 2. Relief from the horizontal curvature requirements in road design between curves and intersections. TMS #267-00-04-014, an unaddressed parcel with the closest address of 684 Carver Park One Drive Seneca SC 29678 Applicant Comments: 2 Stated Name: Luke Williams Mr. Williams outlined the requests, starting with the reduced setbacks, then the curves. Mr. Williams described the unique conditions of the parcel. Mr. Williams discussed the septic system requirements the applicant is working through with the state. The topography of the site is an additional constraint. Staff comments: Mr. Coley addressed setback requirements on the sides between the units, and confirmed that they are meeting the requirements for the right-of-way, and all subdivision application requirements not listed in this variance application. Public comment: NA Applicant rebuttal: NA Board Questions/ Discussion: Mr. Gilster asked about the additional retaining walls needed in the grading plan if the variance was denied. Mr. McCall does not believe the plan meets the subdivision requirements. Mr. McCall added his concerns about firetrucks being able to access the development, and the distance between the units. Mr.McCall addressed the engineered septic system and questioned if the septic system would work for the site. Mr. Eagar asked additional questions regarding the engineered septic system specific to the pumps and topography Consideration of VA25-000001: 1. There are extraordinary and exceptional conditions pertaining to the particular piece of property: a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr. Henderson. No discussion b. Vote In-favor Opposed 3 3 Mr. Eagar noted that the criterion did not pass. 2. These conditions do not generally apply to other property in the vicinity: a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr. Henderson. No Discussion b. Vote 3 In-favor Opposed 3 3 Mr. Eagar noted that the criterion did not pass. 3. Because of these conditions, the application of this chapter to the particular piece of property would effectively prohibit or unreasonably restrict the utilization of the property. a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr. Eagar. No discussion. b. Vote In-favor Opposed 2 3 Ms.Fowler did not vote Mr. Eagar noted that the criterion did not pass. 4. The authorization of a variance will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr. Henderson. No Discussion b. Vote In-favor Opposed 2 4 Mr. Eagar noted that the criterion did not pass. 5. Mr. Coley asked – Based on the evidence presented to the Board, do I hear a motion that the proposed variance be Denied. a. Motion – Mr. McCall made a motion; seconded by Mr. Cox. b. Discussion regarding conditions attached to the approval: NA c. Vote In-favor Opposed 5 1 Mr. Eagar noted that the variance request was Denied Item 5- Variance application #VA25-000003 Houston Henry of DH Building and Son’s Inc is requesting a 3’ reduction to the side setback and a 7’ reduction in the rear setback for a metal garage building. TMS #291-00-04-047, with an address of 227 Snow Creek Road Seneca SC 29678 4 Motion to table item 5 by Mr. Gilster, second Mr. Cox motion passed 6-0 Item 6- Adjourn- Motion by Mr. Gilster approved 6-0 5 Freedom of Information Act - Variance Application Permitting Information Code section from which a variance is requested 38- 10.2 Upload Supporting Documentation Here Application is Application is not APPLICANT RESPONSES TO SECTION 38-7.1 Describe the extraordinary and exceptional condition (such as size, shape, and topography) that pertains to the subject property that does not generally apply to other land or structures in the vicinity.: Flood zone in partial part of the property and creek run the length of the property. Are the circumstances affecting the subject property the result of actions by the applicant/owner? Explain. Yes’m the flood plan affects the land and building Describe the ways in which application of the requirement(s) of the ordinance effectively prohibit or unreasonably restrict the utilization of the subject property.: Will the proposed variance result in an activity that will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. Explain.: This variance will promote more business to the are and surrounding businesses. This would have a positive impact on surrounding property owners . General Contractor Richland Creek ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this code. Comments OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR RESPONSIBILITY. Workflow Reviews Information Type Creation Date Due Date Completion Date Status Description Application Check 11/25/2024 11/26/2024 12/10/2024 Approved 1/23/25, 3:42 PM Permit List | Citizenserve https://www7.citizenserve.com/Admin/PermitController?Action=ListPermits&WorkOrder_ID=89014810&ciDisplay=null&getPrint=true&skipLoading=true 1/4 6 7 8 9 10 11 Freedom of Information Act - Variance Application Permitting Information Code section from which a variance is requested Upload Supporting Documentation Here Application is Application is not restricted by any covenant that conflicts with the requested activity. APPLICANT RESPONSES TO SECTION 38-7.1 Describe the extraordinary and exceptional condition (such as size, shape, and topography) that pertains to the subject property that does not generally apply to other land or structures in the vicinity.: I do not believe there is any condition that does not generally apply to other land or structures in the vicinity. Are the circumstances affecting the subject property the result of actions by the applicant/owner? Explain. Yes, I was unaware of the 50' encroachment from the road, I thought it was 25' and at least one other home on Whispering Pines Lane is within the 50' as well. I do take full accountability for not checking beforehand and making this mistake as the building is 36' from the road. Describe the ways in which application of the requirement(s) of the ordinance effectively prohibit or unreasonably restrict the utilization of the subject property.: I do not believe it restricts the utilization of the subject property or any other property in the vicinity although it is encroaching 14'. (36' from the road) Will the proposed variance result in an activity that will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. Explain.: No, I had the metal building installed to help me transition into moving onto the property to help my 90 year old grandmother more who lives alone right below the subject property. I have spoke with neighbors on Whispering Pines Lane and they fully support the metal building. General Contractor ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this code. Comments OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR RESPONSIBILITY. Workflow Reviews Information Type Creation Date Due Date Completion Date Status Description Application Check 03/14/2025 03/15/2025 03/14/2025 Approved Planning and Zoning Review 03/14/2025 04/29/2025 01/01/1900 Pending Review Complete 03/14/2025 01/01/1900 01/01/1900 Pending Inspection Information Activities Information 4/24/25, 9:14 AM Permit List | Citizenserve https://www3.citizenserve.com/Admin/PermitController?Action=ListPermits&WorkOrder_ID=89416711&ciDisplay=null&getPrint=true&skipLoading=true 1/4 12 13 14 15 Bad Creek Repeater – Duke Energy Response to Section 38-7.2 February 17, 2025 Page 1 of 2 326 Tryon Road, Raleigh, NC 27603-3530 o) 919.661.6351 f) 919.661.6350 jgoins@tepgroup.net; www.tepgroup.net Subject: Site Name: Bad Creek Repeater – Monopole Proposed Duke Energy Monopole 100 Bad Creek Rd, Salem, SC 29676 Response to Oconee County Ordinance, Section 38-7.2 (Special Exceptions): 1. In accordance with the comprehensive plan and is consistent with the spirit, purposes, and the intent and specific requirements of this chapter, to include the definition and intent of the district in which the special exception is being requested. The proposed monopole will be located at 100 Bad Creek Rd on par cel 016-00-01-001 in Oconee County, SC. This site houses a number of power generation facilities managed by Duke Energy. The site is adjacent to the Oconee Nuclear Station, also owned by Duke Energy, which provides vital electricity output to Oconee County and surrounding areas. The proposed monopole will provide plant radio support for the nearby substation. The Future Land Use designations surrounding the location are industrial, which is consistent with the proposed monopole and Duke Energy’s nearby power generation facilities. In terms of future need for electric power, the Comprehensive Plan identifies increases in both housing stock and economic development efforts targeting Advanced Manufacturing, Automotive, Metal Fabrication, and Plastics Injection Molding. These increases will require continued reliability and connectivity from the electric grid, which will be supported by the proposed monopole. Thus, the proposed monopole is consistent with both the land use and economic objectives set forth in the Comprehensive Plan. Additionally, the proposed monopole complies with requirements in Article IV Section 32 -134 – General Requirements. There are no towers within 1,300’ of the proposed monopole location that could be found in the FAA’s database. The only tower is Duke Energy’s outdated self-support on- site which is outdated and being replaced by this monopole. The outdated self -support will be removed once Duke’s plant radio systems have been switched over to the monopole. See “Duke Energy Bad Creek Repeater – Statement of Need Letter” for further information. 2. In the best interests of the county, the convenience of the community and the public welfare. The proposed tower will be an important part of Duke Energy’s power generation infrastructure. Duke Energy’s existing tower is at the End of Life and needs to be replaced with a new tower which is up to code and has the structural capacity for up -to-date communications equipment. While the majority of Duke Energy’s outdated self-support’s functions have been switched over to their new 380’ self-support to the north on the property; that tower does not have coverage for Duke Energy’s local plant radio system as a result of the topography surrounding its location. This monopole serves to fill that gap. It is a public necessity and is critical for the continued connectivity of the Duke Energy system. Thus, the proposed tower aids Duke Energy’s ability to maintain the proper reliability metrics for their customers which enhance public safety and welfare. 16 Bad Creek Repeater – Duke Energy Response to Section 38-7.2 February 17, 2025 Page 2 of 2 326 Tryon Road, Raleigh, NC 27603-3530 o) 919.661.6351 f) 919.661.6350 jgoins@tepgroup.net; www.tepgroup.net 3. Suitable for the property in question, and designed, constructed, operated, and maintained so as to be in harmony with and appropriate in appearance to the existing or intended character of the general vicinity. The proposed tower is located on Duke Energy property. The property contains multiple utility uses including substation and transmission line infrastructure. It is located to the east of the existing Duke Energy Nuclear Substation Facility I. A visual impact analysis was conducted with photo simulation renderings that show minimal visual impacts of the proposed monopole to the surrounding properties and communities. The site is an ideal topography and location for communications with the nearby Duke Energy plant. Thus, the proposed monopole keeps in harmony and appropriate appearance with the existing character of the general vicinity. 4. Suitable in terms of effects on highway traffic, parking, and safety with adequate access arrangements to protect streets from undue congestion and hazards. The proposed monopole will use the current restricted access road into the site and is situated well within the property so as not to interfere with highway traffic. The site will continue to be unmanned and located within Duke’s vast parcel. Few vehicles will access the site or contribute to traffic hazards or congestion. Additionally, the proposed monopole is setback much further than its tower height. In the extremely unlikely event of failure. It would fall well within Duke Energy’s property and would not pose any danger to adjacent properties or communities. If you have any questions, feel free to contact me on my direct number: (919) 943-0397 or reach out at the email address shown below. Sincerely, Ryan Woods rjwoods@tepgroup.net Tower Engineering Professionals (TEP) 17 326 Tryon Rd. Raleigh, NC 27603-3530 O) (919) 661-6351 F) (919) 661-6350 rmalek@tepgroup.net November 19, 2024 Mr. Dale Brooks Duke Energy Subject: Bad Creek Repeater Tower Balloon Test Dear Mr. Brooks, On November 17 th and 18 th, 2024, TEP OpCo, LLC, on behalf of Duke Energy, completed a Balloon Test pursuant to the Oconee County, SC Zoning Ordinance for a proposed 120-ft AGL (130-ft overall with appurtenances/lightning rod) monopole communications tower to be located at 100 Bad Creek Road, north of the town of Salem, within Oconee County, South Carolina at latitude: N 35° 1’ 5.48”, longitude: W 83° 0’ 35.25” (NAD 83). On Sunday, November 17 th, 2024, TEP deployed an approximately 5-ft diameter red balloon at 130-ft above ground level (to top of balloon) from 8:00 a.m. to 5 p.m. EST and again on November 18th, 2024 from 8 a.m to 11 a.m. The weather at the time of the balloon fli ght was sunny and clear, with excellent visibility, and approximately 60 to 70 degrees Fahrenheit with steady approximately 1 to 2 mph northerly wind. Photographs were taken by Garrett Johnson of TEP with a Nikon D3200 digital camera from numerous nearby locations including major roads and public gathering places. The visual impact assessment indicated that the blimp was not visible along Bad Creek Road to the southeast of the site. Additionally, the blimp was visible along one section of Bad Creek Road located south of the proposed tower site. In the areas that the blimp was visible, only approximately 20% or less of the vertical profile was visible above trees and structures. Therefore, the tower base and accessory buildings will not be visible from public rights-of-way and screening would not be necessary. TEP utilized two (2) photographs to create computer-gen erated photo simulations to depict how the proposed communications facility will appear once constructed. One photo simulation is from along the access road that leads to the tower site, west of Bad Creek Road. The second photo simulation is from Bad Creek Road approximately 0.4-miles south of the proposed tower site. Due to the presence of mature vegetation surrounding the proposed tower site and the presence of mature vegetation along the public rights-of-way and throughout the majority of the 1/2-mile visual area of potential effect, it is the opinion of TEP that the proposed tower will have no significant visual impact on the surrounding areas. Attached are the computer-generated photo simulations from two (2) locations surrounding the proposed tower site. Please don’t hesitate to contact me with any questions or concerns regarding this report. Sincerely, Ryan A. Malek Director of Environmental Regulatory Compliance Tower Engineering Professionals, Inc. 18 PROJECT LOCATION DIRECTIONS 1. THE FACILITY IS UNMANNED. 2. A TECHNICIAN WILL VISIT THE SITE APPROXIMATELY ONCE A MONTH FOR ROUTINE INSPECTION AND MAINTENANCE. 3. THE PROJECT WILL NOT RESULT IN ANY SIGNIFICANT LAND DISTURBANCE OR EFFECT OF STORM WATER DRAINAGE. 4. NO SANITARY SEWER, POTABLE WATER OR TRASH DISPOSAL IS REQUIRED. 5. HANDICAP ACCESS IS NOT REQUIRED. 6. THE PROJECT DEPICTED IN THESE PLANS QUALIFIES AS AN ELIGIBLE FACILITIES REQUEST ENTITLED TO EXPEDITED REVIEW UNDER 47 U.S.C. § 1455(A) AS A MODIFICATION OF AN EXISTING WIRELESS TOWER THAT INVOLVES THE COLLOCATION, REMOVAL, AND/OR REPLACEMENT OF TRANSMISSION EQUIPMENT THAT IS NOT A SUBSTANTIAL CHANGE UNDER CFR § 1.61000 (B)(7). SITE ADDRESS: 100 BAD CREEK RD SALEM, SC 29676 COUNTY: OCONEE PARCEL OWNER: DUKE POWER CO PARCEL ID: 016-00-01-001 GEOGRAPHIC COORDINATES: LATITUDE: 35° 01' 05.483" N LONGITUDE: 83° 00' 35.246" W GROUND ELEVATION: 2456' ZONING INFORMATION: JURISDICTION: OCONEE COUNTY ZONING CLASS: N/A PROJECT TEAM APPLICANT: THE PROPOSED PROJECT CONSISTS OF: ·NEW 120' MONOPOLE ·NEW DUKE ENERGY ICE BRIDGE ·NEW DUKE ENERGY ANTENNAS & ASSOCIATED EQUIPMENT ON MONOPOLE DIRECTIONS FROM 9700 DAVID TAYLOR DR, CHARLOTTE, NC 28262: ·GET ON I-85 S FROM DAVID TAYLOR DR AND RESEARCH DR ·CONTINUE STRAIGHT TO STAY ON I-85 S ·TAKE EXIT 70 TO MERGE ONTO I-26 W TOWARD ASHEVILLE ·TAKE EXIT 5 FOR CAROLINA 11 TOWARD CHESNEE/CAMPOBELLO ·TURN LEFT ONTO SC-11 S ·TURN RIGHT ONTO US-276 W ·CONTINUE STRAIGHT ONTO SC-11 S ·TURN RIGHT ONTO SC-130 N ·TURN RIGHT ONTO BAD CREEK RD ·SITE WILL BE ON THE RIGHT COMPLIANCE CODE PROJECT DESCRIPTION POWER COMPANY: DUKE POWER TELEPHONE COMPANY: TBD UTILITY COMPANIES PROJECT SUMMARY SHEET INDEX DUKE ENERGY ID NUMBER LA-SC-617 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER CONSTRUCTION: SHEET NO:DESCRIPTION: T-1TITLE SHEET & PROJECT INFORMATION T-1.1GENERAL NOTES T-1.2GENERAL NOTES --SURVEY C-1ENLARGED SITE PLAN C-2TOWER ELEVATION C-2.1TOWER DESIGN C-2.2TOWER DESIGN C-3CONSTRUCTION DETAILS S-1TOWER DETAILS E-1OVERALL UTILITY PLAN G-1GROUNDING SITE PLAN G-2 TO G-2.0.2GROUNDING DETAILS & NOTES GULF EQUIPMENT CORP. dba GULF SERVICES 5540 BUSINESS PARKWAY THEODORE,AL 36582-1616 CONTACT: CUSTOMER SERVICE PHONE: 251-653-5075 VICINITY MAP PROJECT NOTES ENGINEER: SMW ENGINEERING 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 CONTACT: JEREMY SHARIT, PE PHONE: 205-397-6781 TITLE SHEET & PROJECT INFORMATION DUKE ENERGY CAROLINAS LLC 9700 DAVID TAYLOR BLVD CHARLOTTE, NC 28262 T-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER TOWER OWNER: DUKE ENERGY ALL WORK SHALL BE PERFORMED AND MATERIALS INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNMENT AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES. 1. 2021 SOUTH CAROLINA BUILDING CODE OR THE 2021 INTERNATIONAL BUILDING CODE WITH SC MODIFICATIONS 2. 2021 SOUTH CAROLINA RESIDENTIAL CODE OR THE 2021 INTERNATIONAL RESIDENTIAL CODE WITH SC MODIFICATIONS 3. 2021 SOUTH CAROLINA FIRE CODE OR THE 2021 INTERNATIONAL FIRE CODE WITH SC MODIFICATIONS 4. 2021 SOUTH CAROLINA PLUMBING CODE OR THE 2021 INTERNATIONAL PLUMBING CODE 5. 2021 SOUTH CAROLINA MECHANICAL CODE OR THE 2021 INTERNATIONAL MECHANICAL CODE WITH SC MODIFICATIONS 6. 2021 SOUTH CAROLINA FUEL GAS CODE OR THE 2021 INTERNATIONAL FUEL GAS CODE WITH SC MODIFICATIONS 7. 2009 SOUTH CAROLINA ENERGY CONSERVATION CODE 8. 2020 NATIONAL ELECTRICAL CODE (NFPA 70) WITH SC MODIFICATIONS 19 T-1.1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GENERAL NOTES GENERAL NOTES: 1. ALL REFERENCES TO OWNER HEREIN SHALL BE CONSTRUED TO MEAN DUKE ENERGY OR ITS DESIGNATED REPRESENTATIVE. 2. ALL WORK PRESENTED ON THESE DRAWINGS MUST BE COMPLETED BY THE CONTRACTOR UNLESS NOTED OTHERWISE. THE CONTRACTOR MUST HAVE CONSIDERABLE EXPERIENCE IN PERFORMANCE OF WORK SIMILAR TO THAT DESCRIBED HEREIN. BY ACCEPTANCE OF THIS ASSIGNMENT, THE CONTRACTOR IS ATTESTING THAT HE DOES HAVE SUFFICIENT EXPERIENCE AND ABILITY, THAT HE IS KNOWLEDGEABLE OF THE WORK TO BE PERFORMED AND THAT HE IS PROPERLY LICENSED AND PROPERLY REGISTERED TO DO THIS WORK IN THE STATE AND/OR COUNTY IN WHICH IT IS TO BE PERFORMED. 3. UNLESS SHOWN OR NOTED OTHERWISE ON THE CONTRACT DRAWINGS, OR IN THE SPECIFICATIONS, THE FOLLOWING NOTES SHALL APPLY TO THE MATERIALS LISTED HEREIN, AND TO THE PROCEDURES TO BE USED ON THIS PROJECT. 4. ALL HARDWARE ASSEMBLY MANUFACTURER'S INSTRUCTIONS SHALL BE FOLLOWED EXACTLY AND SHALL SUPERCEDE ANY CONFLICTING NOTES ENCLOSED HEREIN. 5. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE STRUCTURE AND ITS COMPONENT PARTS DURING ERECTION AND/OR FIELD MODIFICATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE ADDITION OF WHATEVER TEMPORARY BRACING, GUYS OR TIE DOWNS THAT MAY BE NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR AFTER THE COMPLETION OF THE PROJECT. 6. ALL DIMENSIONS, ELEVATIONS, AND EXISTING CONDITIONS SHOWN ON THE DRAWINGS SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND THE TESTING AGENCY PRIOR TO BEGINNING ANY MATERIALS ORDERING, FABRICATION OR CONSTRUCTION WORK ON THIS PROJECT. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND THE OWNER'S ENGINEER. THE DISCREPANCIES MUST BE RESOLVED BEFORE THE CONTRACTOR IS TO PROCEED WITH THE WORK. THE CONTRACT DOCUMENTS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES. OBSERVATION VISITS TO THE SITE BY THE OWNER AND/OR THE ENGINEER SHALL NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR THE CONSTRUCTION PROCEDURES. 7. ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW AND OF GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY AND ALL SUBSTITUTIONS MUST BE PROPERLY APPROVED AND AUTHORIZED IN WRITING BY THE OWNER AND ENGINEER PRIOR TO INSTALLATION. THE CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF THE MATERIALS AND EQUIPMENT BEING SUBSTITUTED. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR INSURING THAT THIS PROJECT AND RELATED WORK COMPLIES WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL SAFETY CODES AND REGULATIONS GOVERNING THIS WORK. 9. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE LATEST EDITION OF THE LOCAL BUILDING CODE. 10. ACCESS TO THE PROPOSED WORK SITE MAY BE RESTRICTED. THE CONTRACTOR SHALL COORDINATE INTENDED CONSTRUCTION ACTIVITY, INCLUDING WORK SCHEDULE AND MATERIALS ACCESS, WITH THE OWNER FOR APPROVAL. 11. PREFABRICATED BUILDING INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. STRUCTURAL STEEL NOTES: 1. STRUCTURAL STEEL SHALL CONFORM TO THE LATEST EDITION OF THE A.I.S.C. SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS- ALLOWABLE STRESS DESIGN AND PLASTIC DESIGN INCLUDING THE COMMENTARY AND THE A.I.S.C. CODE OF STANDARD PRACTICE. 2. STRUCTURAL STEEL PLATES AND SHAPES SHALL CONFORM TO ASTM A26. ALL STRUCTURAL STEEL PIPES SHALL CONFORM TO ASTM A53 GRADE B. ALL STRUCTURAL STEEL TUBING SHALL CONFORM TO ASTM A500 GRADE B. ALL STRUCTURAL STEEL COMPONENTS AND FABRICATED ASSEMBLIES SHALL BE HOT DIP GALVANIZED AFTER FABRICATION. 3. WELDING SHALL BE IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY (AWS) D.1.1/D1.1M:2010. STRUCTURAL WELDING CODE-STEEL WELD ELECTRODES SHALL BE E70XX. 4. ALL COAXIAL CABLE CONNECTORS AND TRANSMITTER EQUIPMENT SHALL BE AS SPECIFIED BY THE OWNER. THE CONTRACTOR SHALL FURNISH ALL CONNECTION HARDWARE REQUIRED TO SECURE THE CABLES. CONNECTION HARDWARE SHALL BE STAINLESS STEEL. 5. ALL REINFORCING STEEL SHALL CONFORM TO ASTM 615 GRADE 60, DEFORMED BILLET STEEL BARS. WELDED WIRE FABRIC REINFORCING SHALL CONFORM TO ASTM A185. 6. THE FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE LATEST A.I.S.C. SPECIFICATIONS. 7. ALL CONNECTIONS NOT FULLY DETAILED ON THESE PLANS SHALL BE DETAILED BY THE STEEL FABRICATOR IN ACCORDANCE WITH A.I.S.C. SPECIFICATIONS. 8. HOT-DIP GALVANIZE ITEMS SPECIFIED TO BE ZINC-COATED, AFTER FABRICATION WHERE PRACTICAL. GALVANIZING: ASTM A 123, ASTM, A 153/A 153M OR ASTM A 653/A 653M, G90, AS APPLICABLE. 9. REPAIR DAMAGED SURFACES WITH GALVANIZING REPAIR METHOD AND PAINT CONFORMING TO ASTM A 780 OR BY APPLICATION OF STICK OR THICK PASTE MATERIAL SPECIFICALLY DESIGNED FOR REPAIR OF GALVANIZING. CLEAN AREAS TO BE REPAIRED, AND REMOVE SLAG FROM WELDS. HEAT SURFACES TO WHICH STICK OR PASTE MATERIAL IS APPLIED WITH A TORCH TO A TEMPERATURE SUFFICIENT TO MELT THE METALLICS. IN STICK OR PASTE, SPREAD MOLTEN MATERIAL UNIFORMLY OVER SURFACES TO BE COATED AND WIPE OFF EXCESS MATERIAL. 10. CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S INSTRUCTIONS/SPECIFICATIONS IF NO INFORMATION IS CONTAINED IN THESE PLANS OR IF THE MANUFACTURER'S SPECIFICATIONS ARE STRICTER. NOTE: REFER TO DUKE ENERGY SPECIFICATIONS AS THE CONTROLLING STANDARD FOR PROPOSED CONSTRUCTION. PERMITS: 1. CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS FOR THIS PROJECT FROM ALL APPLICABLE GOVERNMENTAL AGENCIES. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ABIDING BY ALL CONDITIONS AND REQUIREMENTS OF THE PERMITS. 3. ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES AND THE ACI 318-08, "BUILDING REQUIREMENTS FOR STRUCTURAL CONCRETE". 4. THE CONTRACTOR SHALL NOTIFY THE APPLICABLE JURISDICTIONAL (STATE, COUNTY OR CITY) ENGINEER 24 HOURS PRIOR TO THE BEGINNING OF CONSTRUCTION. 5. ALL DIMENSIONS SHALL BE VERIFIED WITH THE PLANS (LATEST REVISION) PRIOR TO COMMENCING CONSTRUCTION. NOTIFY THE OWNER IMMEDIATELY IF DISCREPANCIES ARE DISCOVERED. THE CONTRACTOR SHALL HAVE A SET OF APPROVED PLANS AVAILABLE AT THE SITE AT ALL TIMES WHEN WORK IS BEING PERFORMED. A DESIGNATED RESPONSIBLE EMPLOYEE SHALL BE AVAILABLE FOR CONTACT BY GOVERNING AGENCY INSPECTORS. MISCELLANEOUS: 1. ALL THREADED STRUCTURAL FASTENERS FOR ANTENNA SUPPORT ASSEMBLES SHALL CONFORM TO ASTM A307 OR ASTM 36. ALL STRUCTURAL FASTNERS FOR STRUCTURAL STEEL FRAMING SHALL CONFORM TO ASTM A325. FASTENERS SHALL BE 5/8" MIN. DIA. BEARING TYPE CONNECTIONS WITH THREADS EXCLUDED FROM THE PLANE. ALL EXPOSED FASTENERS, NUTS, AND WASHERS SHALL BE GALVANIZED UNLESS OTHERWISE NOTED. ALL ANCHORS INTO CONCRETE SHALL BE STAINLESS STEEL. 2. THE CONTRACTOR SHALL FURNISH ALL CONNECTION HARDWARE REQUIRED TO SECURE THE CABLES. CONNECTION HARDWARE SHALL BE STAINLESS STEEL. 3. NORTH ARROW SHOWN ON PLANS REFERS TO TRUE NORTH. CONTRACTOR SHALL VERIFY NORTH AND NOTIFY CONSULTANT OF ANY DISCREPANCY BEFORE STARTING CONSTRUCTION. 4. PROVIDE LOCK WASHERS FOR ALL MECHANICAL CONNECTIONS FOR GROUND CONDUCTORS. USE STAINLESS STEEL HARDWARE THROUGHOUT. 5. THOROUGHLY REMOVE ALL PAINT AND CLEAN ALL DIRT FROM SURFACES REQUIRING GROUND CONNECTIONS. 6. MAKE ALL GROUND CONNECTIONS AS SHORT AND DIRECT AS POSSIBLE. AVOID SHARP BENDS. ALL BENDS TO BE A MIN. OF 8" RADIUS. 7. FOR ALL EXTERNAL GROUND CONNECTIONS, CLAMPS AND CADWELDS, APPLY A LIBERAL PROTECTIVE COATING OR AN ANTI-OXIDE COMPOUND SUCH AS 'NO-OXIDE A' BY DEARBORN CHEMICAL COMPANY. 8. REPAIR ALL METAL SURFACES THAT HAVE BEEN CUT OR DAMAGED BY REMOVING ANY EXISTING RUST AND APPLYING COLD GALVANIZATION. 9. ANTENNA CABLE LENGTHS HAVE BEEN DETERMINED BASED ON THESE PLANS. CABLE LENGTHS LISTED ARE APPROXIMATED AND ARE NOT INTENDED TO BE USED FOR FABRICATION. DUE TO FIELD CONDITIONS, ACTUAL CABLE LENGTHS VARY. CONTRACTOR MUST FIELD VERIFY ANTENNA CABLE LENGTHS PRIOR TO ORDER. 20 T-1.2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GENERAL NOTES FENCE M X G CONTOUR LINE PROPERTY LINE/ROW LEASE AREA EASEMENT DISCONNECT SWITCH METER CIRCUIT BREAKER CODED NOTE NUMBER CHEMICAL GROUND ROD GROUND ROD GROUND ROD W/ INSPECTION SLEEVE CADWELD TYPE CONNECTION COMPRESSION TYPE CONNECTION GROUND WIRE xxxxxxxxxx SYMBOL LEGEND:ABBREVIATIONS : A.B. ANCHOR BOLT AGL ABOVE GROUND LEVEL AMSL ABOVE MEAN SEA LEVEL APPROX APPROXIMATE ASR ANTENNA STRUCTURE REGISTRATION ATS AUTOMATIC TRANSFER SWITCH AWG AMERICAN WIRE GAUGE BCW BARE COPPER WIRE BTCW BARE TINNED COPPER WIRE CGB COAX GROUND BAR (SHELTER) CGBE COAX GROUND BAR EXTERIOR CLR CLEAR COMM COMMUNICATIONS COND CONDUIT CU COPPER DET DETAIL DIA DIAMETER DV DIVERSITY DWG DRAWING EGB EXTERIOR GROUND BAR EL= ELEVATION EQUALS (AMSL, UNLESS OTHERWISE NOTED) EQUIP EQUIPMENT EW EACH WAY EXP EXPANSION FDN FOUNDATION FFE FINISHED FLOOR ELEVATION FLEX FLEXIBLE FOC FIBER OPTIC CABLE GA GAUGE GALV GALVANIZED GEN GENERATOR GCFI GROUND FAULT CIRCUIT INTERRUPTER HDPE HIGH DENSITY POLYETHYLENE HVAC HEATING, VENTILATION, & AIR CONDITIONING I.D. INTERIOR DIAMETER IGB INTERMEDIATE GROUND BAR IGR INTERIOR GROUND RING (SHELTER) kVA KILOVOLT AMPERES LMR LAND MOBILE RADIO LPG LIQUID PETROLEUM GAS MAS MULTIPLE ADDRESS (RADIO) SYSTEM MAX MAXIMUM MGB MASTER GROUND BAR MIN MINIMUM MISC MISCELLANEOUS MTS MANUAL TRANSFER SWITCH MW MICROWAVE MW-DV MICROWAVE DIVERSITY PLCS PLACES PSI POUNDS per SQUARE INCH PVC POLYVINYL CHLORIDE (CONDUIT) REQ'D REQUIRED RGS RIGID GALVANIZED STEEL (CONDUIT) SCHED SCHEDULE SCHEM SCHEMATIC SYS SYSTEM T&B TOP & BOTTOM TBD TO BE DETERMINED TELCO TELEPHONE COMPANY TGB TOWER GROUND BAR T.O.C. TOP OF CONCRETE T.O.S. TOP/TOE OF SLOPE TYP TYPICAL XFMR TRANSFORMER 21 22 23 op op op op op op op op op op op op op op op op op op op op UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP G C-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER ENLARGED SITE PLAN 10'010' 5' SCALE: 1"=5' (22X34) 1"=10' (11X17) EXISTING TREES TO BE REMOVED WITHIN COMPOUND AND EASEMENT. CONTRACTOR TO FIELD VERIFY BEFORE CONSTRUCTION EXISTING GENERATOR ON CONCRETE PAD EXISTING LP TANK EXISTING UNDERGROUND POWER (TYP) EXISTING EDGE OF GRAVEL EXISTING TREELINE EXISTING ICE BRIDGE PROPOSED 120' MONOPOLE PROPOSED ±19' ICE BRIDGE (TYP) EXISTING SELF SUPPORT TOWER EXISTING 18' WIDE ASPHALT DRIVE EXISTING OVERHEAD POWER LINE (TYP) EXISTING DUKE ENERGY EQUIPMENT SHELTER CONTRACTOR TO CUT OPENING AND INSTALL COAX HATCH PLATE ON SIDE OF EXISTING SHELTER 24 C-2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER PROPOSED MONOPOLE PROPOSED 10' LIGHTNING ROD TOWER ELEVATION 16'016' 8' SCALE: 1"=8' (22X34) 1"=16' (11X17) TOP OF PROPOSED TOWER ELEV.: 120'-0" AGL TOTAL TOWER HEIGHT INCLUDING APPURTENANCES ELEV.: 130'-0" AGL PROPOSED DUKE ANTENNA MOUNT ELEV.: 117'-0" AGL PROPOSED DUKE ANTENNA ELEV.: 122'-6" AGL PROPOSED DUKE ANTENNA ELEV.: 102'-6" AGL PROPOSED DUKE ANTENNA MOUNT ELEV.: 97'-0" AGL 25 C-2.1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER TOWER DESIGN 26 C-2.2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER TOWER DESIGN 27 C-3 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER CONSTRUCTION DETAILS 2'-0" 7'-0" CLEAR4'-0" 4" (MAX.) 12" 3000 PSI CONCRETE CRUSHED STONE ON OTHER SURFACE 1/2" CROWN TOP 3 1/2"GALVANIZED PIPE. 8'-0" MAXIMUM SPACING. PLACE EACH ON ALTERNATE SIDE OF BRIDGE. NEW DC AND FIBER CABLES CLAMPED TO UNISTRUT 2"X2" HD. G. UNISTRUT @ 3'-0" O.C. MAX. 2"X2" HD. G. UNISTRUT @ 3'-0" O.C. MAX. WAVEGUIDE BRIDGE SUPPORT BRACKET NEW GPS ANTENNA 2ICE BRIDGE CABLE DETAIL SCALE: NOT TO SCALE ICE BRIDGE NOTE: ·PRIOR TO CONSTRUCTION FIELD COORDINATE HEIGHT AND ROUTE OF ICE BRIDGE WITH TOWER OWNER ·ALL SUPPORT POSTS MUST BE GROUNDED 1GPS ANTENNA MOUNTING DETAIL SCALE: NOT TO SCALE GPS 1.32" O.D. x 14" MAX. MOUNTING PIPE 1/2"Ø BOLT (TYP.) GPS MOUNT ON SWIC WALL CABLES (PROVIDED W/ ANTENNA) ESTABLISH CONNECTION AND PROVIDE WEATHERPROOF KIT NOTES: 1. LOCATION OF GPS MUST HAVE CLEAR VIEW OF SOUTHERN SKY AND CANNOT HAVE ANY BLOCKAGES EXCEEDING 25% OF THE SURFACE AREA OF A HEMISPHERE AROUND THE GPS. 2. ALL GPS LOCATIONS MUST BE ABLE TO RECEIVE CLEAR SIGNALS FROM A MINIMUM OF FOUR (4) SATELLITES. VERIFY WITH HANDHELD GPS BEFORE FINAL LOCATION OF GPS. 28 S-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER TOWER DETAILS TOWER ELEVATION DETAIL 1 GENERAL CONSTRUCTION NOTES: INSTALLATION NOTES: 29 op op op op op op op op op op op op op op op op op op op T UGP UGP UGP UGP UGP UGP UGP UNDERGROUND POWER (RED PAINT, MARKED BY OTHERS) POWER BOX ON CONCRETE PAD T T UNDERGROUND COMMUNICATION (ORANGE PAINT, MARKED BY OTHERS) UGP UNDERGROUND POWER (RED PAINT, MARKED BY OTHERS) UNDERGROUND GAS (YELLOW PAINT, MARKED BY OTHERS) UTILITY/METER RACK 18' WIDE ASPHALT DRIVE E-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER OVERALL UTILITY PLAN 50'050' 25' SCALE: 1"=25' (11X17) 1"=50' (22X34) PROPOSED 120' MONOPOLE PROPOSED ±19' ICE BRIDGE (TYP) EXISTING POWER POLE (TYP) EXISTING TELCO PEDESTAL (TYP) EXISTING SELF SUPPORT TOWER EXISTING LP TANK EXISTING TREELINE EXISTING OVERHEAD POWER LINE (TYP) EXISTING DUKE ENERGY EQUIPMENT SHELTER 2-2" PVC FROM SERVICE POLE TO HANDHOLE PLACED WITHIN 5' OF SERVICE POLE . 1-4" PVC FROM HANDHOLE TO 12"x12"x6" JUNCTION BOX AT SHELTER WITH TRACER WIRE AND PULL STRING 12"x12"x6" PVC JUNCTION BOX AT BUILDING. WITH 1-4" PENETRATION TO SHELTER 2-2" PVC FROM SERVICE POLE TO HANDHOLE PLACED WITHIN 5' OF SERVICE POLE . 1-4" PVC FROM HANDHOLE TO 12"x12"x6" JUNCTION BOX AT SHELTER WITH TRACER WIRE AND PULL STRING 30 G-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GROUNDING SITE PLAN 1 2 4 10'010' 5' SCALE: 1"=5' (22X34) 1"=10' (11X17) EXISTING GENERATOR ON CONCRETE PAD EXISTING LP TANK EXISTING EDGE OF GRAVEL EXISTING TREELINE EXISTING ICE BRIDGE PROPOSED 120' MONOPOLE PROPOSED ±19' ICE BRIDGE (TYP) EXISTING SELF SUPPORT TOWER EXISTING DUKE ENERGY EQUIPMENT SHELTER 3 6 1GROUNDING SITE PLAN SCALE: AS NOTED 10 5 9 31 G-2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GROUNDING DETAILS & NOTES SCALE: N.T.S.1 CADWELD GROUNDING CONNECTION DETAILS SCALE: N.T.S.2 ANTENNA & CABLE GROUNDING SCALE: N.T.S.5 GROUNDING STRAP WEATHERPROOFING DETAIL SCALE: N.T.S.6 TYPICAL GROUND BAR CONNECTION DETAIL SCALE: N.T.S.4 GENERAL LUG DETAIL SCALE: N.T.S.3 GROUNDING ROD DETAIL 32 G-2.0.1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GROUNDING DETAILS & NOTES NOTCH SIDES OF 8" PVC SCH 40 PIPE TO ALLOW EXIT/ENTRANCE OF GROUND RINGGROUND RING 5/8"x10' GROUND ROD TRENCH BOTTOM FINISHED GRADE GALV. STEEL Ø .469x.719 TYP (41) PL Ø .469x.719 TYP (41) PL 1 BOLT TO ANGLE IRON (OR TOWER LEG) HARDWARE 2 GROUNDING CONDUCTORS CONTINUED TO GROUND LOOP SEE PLAN TOP OF CRUSHED STONE ANTENNA CABLES TOWER MOUNTING PLATE FOR GROUND BAR (TO SUIT) STAND-OFF INSULATORS (2)-#2/0-19 STRANDED TINNED COPPER GROUND WIRE IN PVC SCH. 40 CONDUIT (TYP). EXTEND CONDUIT 6" BELOW GRADE. GROUND WIRE TO BUS BAR #2/0-19 STRANDED TINNED COPPER GROUND WIRE NOTE: ALL ICE BRIDGE POSTS. EXTEND CONCRETE TO 6" ABOVE GRADE AND CROWN TOP CONDUIT STRAPS TO SUIT GK-GROUND KIT BASE OF TOWER. 1/4"x4"x20" LG COPPER BUS BAR (SEE DETAIL) #2/0-19 STRANDED TINNED COPPER GROUND WIRE ICE BRIDGE POST (TYP) JUMP ICE BRIDGE SECTIONS. UTILIZE #2 SOLID TINNED HYPRESS LUGS ON BOTH SIDES WITH DOUBLE BOLT CONNECTIONS (TYP)NEW ICE BRIDGE ANTENNA CABLES JUMP ICE BRIDGE SECTIONS. UTILIZE #2 SOLID TINNED (TYP) GK-GROUND KIT EXTERIOR COPPER BUS BAR 45° EXIT OUT OF BUILDING SLEEVED IN 3/4" PVC SCH. 40 CONDUIT, 18" BELOW GRADE ALL GROUND LEADS GOING BELOW GRADE NEED SLEEVED USE VSC-1T-V3C VERTICAL CADWELD MOLD REDCAUTIONCAUTIONCAUTION BURIED ELECTRIC LINE BELOW ORANGECAUTIONCAUTIONCAUTION BURIED TELEPHONE LINE BELOW TOP OF COMPOUND STONE DIRECT BURIAL CABLE OR CONDUIT (POWER, CONTROL, TELEPHONE, TELEMETERING, ETC) INSTALLATION 1. THE TAPE SHALL BE LAID DIRECTLY ABOVE THE CABLE OR CONDUIT UNDER RIGID TYPE AND OIL MAT PAVEMENTS, AND DIRECTLY ON TOP OF THE COMPACTED EARTH SUBGRADE IMMEDIATELY BEFORE RESTORING THE PAVEMENT. 2. IN OPEN AREAS, THE TAPE SHALL BE LAID DURING THE BACKFILLING OPERATION ON SMOOTH, COMPACTED BACKFILL AT A DISTANCE OF 8" BELOW THE SURFACE OF THE AREA. 3. THE ENDS OF THE TAPE SHALL BE LAPPED APPROXIMATELY SIX (6) INCHES. 4. TAPE SHALL BE THE COLOR AS INDICATED AND HAVE THE FOLLOWING MARKINGS: #2 STRANDED COPPER WIRE CADWELD WIRE TO POSTS SCALE: N.T.S.5 TOWER LEG BUS BAR DETAIL SCALE: N/A7 NOT USED SCALE: N.T.S.6 STANDARD MARKER TAPE DETAIL SCALE: N.T.S.3 INSPECTION WELL DETAIL SCALE: N.T.S.2 NOT USED SCALE: N.T.S.1 COAXIAL GROUNDING AT ICE BRIDGE SCALE: N.T.S.4 NOT USED ELECTRIC MOTION CO., INC. 110 GROPPO DR./ BOX 626 WINSTED, CT 06098 PART #EM SGM420-BI-NR 203-009-0118-0002"x2" INSULATOR; FIBERGLASS2 1 ITEM 02-009-0672-000 PART NO. 1 20" GROUND BAR; TINNED OR COPPER DESCRIPTIONREQ CAP FENCE GROUNDING REQUIREMENTS WILL VARY BY OWNER. SOME MAY OR MAY NOT REQUIRE FABRIC GROUNDING. 33 G-2.0.2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GROUNDING DETAILS & NOTES GN-2 ANTENNA FEEDLINE GROUND KITS ANTENNA FEEDLINE GROUND KITS ANTENNA FEEDLINE GROUND KITS #6 AWG #6 AWG #6 AWG ANTENNA FEEDLINE GROUND KITS ANTENNA FEEDLINE GROUND KITS #6 AWG #6 AWG ANTENNA FEEDLINE GROUND KITS WAVEGUIDE FEEDLINE GROUND KITS AND COAX SURGE SUPRESSORS AC UNITS TGB IGB EGB CGB MGB #6 AWG COMM CABINETS TOWER CGBE BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW 10 FT LIGHTNING ROD CABINETS TIE-DOWN PLATES, TYP 4 PLCS ICE BRIDGE SUPPORTS #6 AWG #2/0 THHN THHN BTCW DISC SW M CONDUITS (IF METAL) #2 THHN EXISTING FENCES, GATES, ETC. PROPANE TANK & GENERATOR GROUND LUGS GENERAL NOTES: 1. FOR LEGEND AND ABBREVIATIONS SEE GN-2 SCHEMATIC DIAGRAM - GROUNDING SYSTEM NOTES: 1. #2/0 19 STRAND BARE TINNED COPPER WIRE (BTCW) UNLESS OTHERWISE NOTED. 2. BOND ANTENNA FEED LINE GROUND KIT CABLE TO GROUND BAR (SEE SHEET G-2). 3. PROVIDE STRANDED BTCW BURIED GROUND SYSTEM W/ GROUND RODS (SEE SHEET G-1). 4. LIGHTNING ROD GROUND LEADS SHALL BE CONNECTED TO THE TGB. 5. AN INTERMEDIATE GROUND BAR MAY BE USED WHERE ONE OR MORE ANTENNAS ARE GROUNDED AT THE SAME NOMINAL ELEVATION (SEE SHEET G-2). 6. ALL CONNECTIONS TO THE EARTH GROUND SYSTEM TO BE MADE WITH EXOTHERMIC WELDS. 7. ALL ABOVE GROUND LEADS SHALL BE PROTECTED BY PVC CONDUIT. NEW GROUNDNOTE 3 NOTE 6 BTCW NOTE 5 ANTENNA #1 NOTE 2 ANTENNA #2 NOTE 2 ANTENNA #__ NOTE 2 34 Photo Locations Bad Creek Hydro Repeater (LA-SC-617) 100 Bad Creek RD Salem, SC 29676 35 Monopole Tower Simulation 130-ft AGL Photo #1 - approx. 150-feet NE of site Bad Creek Hydro Repeater (LA-SC-617) 100 Bad Creek RD Salem, SC 29676 36 Monopole Tower Simulation 130-ft AGL Photo #2 - approx. 0.4-miles S of site Bad Creek Hydro Repeater (LA-SC-617) 100 Bad Creek RD Salem, SC 29676 37 PROJECT LOCATION DIRECTIONS 1. THE FACILITY IS UNMANNED. 2. A TECHNICIAN WILL VISIT THE SITE APPROXIMATELY ONCE A MONTH FOR ROUTINE INSPECTION AND MAINTENANCE. 3. THE PROJECT WILL NOT RESULT IN ANY SIGNIFICANT LAND DISTURBANCE OR EFFECT OF STORM WATER DRAINAGE. 4. NO SANITARY SEWER, POTABLE WATER OR TRASH DISPOSAL IS REQUIRED. 5. HANDICAP ACCESS IS NOT REQUIRED. 6. THE PROJECT DEPICTED IN THESE PLANS QUALIFIES AS AN ELIGIBLE FACILITIES REQUEST ENTITLED TO EXPEDITED REVIEW UNDER 47 U.S.C. § 1455(A) AS A MODIFICATION OF AN EXISTING WIRELESS TOWER THAT INVOLVES THE COLLOCATION, REMOVAL, AND/OR REPLACEMENT OF TRANSMISSION EQUIPMENT THAT IS NOT A SUBSTANTIAL CHANGE UNDER CFR § 1.61000 (B)(7). SITE ADDRESS: 100 BAD CREEK RD SALEM, SC 29676 COUNTY: OCONEE PARCEL OWNER: DUKE POWER CO PARCEL ID: 016-00-01-001 GEOGRAPHIC COORDINATES: LATITUDE: 35° 01' 05.483" N LONGITUDE: 83° 00' 35.246" W GROUND ELEVATION: 2456' ZONING INFORMATION: JURISDICTION: OCONEE COUNTY ZONING CLASS: N/A PROJECT TEAM APPLICANT: THE PROPOSED PROJECT CONSISTS OF: ·NEW 120' MONOPOLE ·NEW DUKE ENERGY ICE BRIDGE ·NEW DUKE ENERGY ANTENNAS & ASSOCIATED EQUIPMENT ON MONOPOLE DIRECTIONS FROM 9700 DAVID TAYLOR DR, CHARLOTTE, NC 28262: ·GET ON I-85 S FROM DAVID TAYLOR DR AND RESEARCH DR ·CONTINUE STRAIGHT TO STAY ON I-85 S ·TAKE EXIT 70 TO MERGE ONTO I-26 W TOWARD ASHEVILLE ·TAKE EXIT 5 FOR CAROLINA 11 TOWARD CHESNEE/CAMPOBELLO ·TURN LEFT ONTO SC-11 S ·TURN RIGHT ONTO US-276 W ·CONTINUE STRAIGHT ONTO SC-11 S ·TURN RIGHT ONTO SC-130 N ·TURN RIGHT ONTO BAD CREEK RD ·SITE WILL BE ON THE RIGHT COMPLIANCE CODE PROJECT DESCRIPTION POWER COMPANY: DUKE POWER TELEPHONE COMPANY: TBD UTILITY COMPANIES PROJECT SUMMARY SHEET INDEX DUKE ENERGY ID NUMBER LA-SC-617 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER CONSTRUCTION: SHEET NO:DESCRIPTION: T-1TITLE SHEET & PROJECT INFORMATION T-1.1GENERAL NOTES T-1.2GENERAL NOTES --SURVEY C-1ENLARGED SITE PLAN C-2TOWER ELEVATION C-2.1TOWER DESIGN C-2.2TOWER DESIGN C-3CONSTRUCTION DETAILS S-1TOWER DETAILS E-1OVERALL UTILITY PLAN G-1GROUNDING SITE PLAN G-2 TO G-2.0.2GROUNDING DETAILS & NOTES GULF EQUIPMENT CORP. dba GULF SERVICES 5540 BUSINESS PARKWAY THEODORE,AL 36582-1616 CONTACT: CUSTOMER SERVICE PHONE: 251-653-5075 VICINITY MAP PROJECT NOTES ENGINEER: SMW ENGINEERING 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 CONTACT: JEREMY SHARIT, PE PHONE: 205-397-6781 TITLE SHEET & PROJECT INFORMATION DUKE ENERGY CAROLINAS LLC 9700 DAVID TAYLOR BLVD CHARLOTTE, NC 28262 T-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER TOWER OWNER: DUKE ENERGY ALL WORK SHALL BE PERFORMED AND MATERIALS INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNMENT AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES. 1. 2021 SOUTH CAROLINA BUILDING CODE OR THE 2021 INTERNATIONAL BUILDING CODE WITH SC MODIFICATIONS 2. 2021 SOUTH CAROLINA RESIDENTIAL CODE OR THE 2021 INTERNATIONAL RESIDENTIAL CODE WITH SC MODIFICATIONS 3. 2021 SOUTH CAROLINA FIRE CODE OR THE 2021 INTERNATIONAL FIRE CODE WITH SC MODIFICATIONS 4. 2021 SOUTH CAROLINA PLUMBING CODE OR THE 2021 INTERNATIONAL PLUMBING CODE 5. 2021 SOUTH CAROLINA MECHANICAL CODE OR THE 2021 INTERNATIONAL MECHANICAL CODE WITH SC MODIFICATIONS 6. 2021 SOUTH CAROLINA FUEL GAS CODE OR THE 2021 INTERNATIONAL FUEL GAS CODE WITH SC MODIFICATIONS 7. 2009 SOUTH CAROLINA ENERGY CONSERVATION CODE 8. 2020 NATIONAL ELECTRICAL CODE (NFPA 70) WITH SC MODIFICATIONS 38 T-1.1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GENERAL NOTES GENERAL NOTES: 1. ALL REFERENCES TO OWNER HEREIN SHALL BE CONSTRUED TO MEAN DUKE ENERGY OR ITS DESIGNATED REPRESENTATIVE. 2. ALL WORK PRESENTED ON THESE DRAWINGS MUST BE COMPLETED BY THE CONTRACTOR UNLESS NOTED OTHERWISE. THE CONTRACTOR MUST HAVE CONSIDERABLE EXPERIENCE IN PERFORMANCE OF WORK SIMILAR TO THAT DESCRIBED HEREIN. BY ACCEPTANCE OF THIS ASSIGNMENT, THE CONTRACTOR IS ATTESTING THAT HE DOES HAVE SUFFICIENT EXPERIENCE AND ABILITY, THAT HE IS KNOWLEDGEABLE OF THE WORK TO BE PERFORMED AND THAT HE IS PROPERLY LICENSED AND PROPERLY REGISTERED TO DO THIS WORK IN THE STATE AND/OR COUNTY IN WHICH IT IS TO BE PERFORMED. 3. UNLESS SHOWN OR NOTED OTHERWISE ON THE CONTRACT DRAWINGS, OR IN THE SPECIFICATIONS, THE FOLLOWING NOTES SHALL APPLY TO THE MATERIALS LISTED HEREIN, AND TO THE PROCEDURES TO BE USED ON THIS PROJECT. 4. ALL HARDWARE ASSEMBLY MANUFACTURER'S INSTRUCTIONS SHALL BE FOLLOWED EXACTLY AND SHALL SUPERCEDE ANY CONFLICTING NOTES ENCLOSED HEREIN. 5. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE STRUCTURE AND ITS COMPONENT PARTS DURING ERECTION AND/OR FIELD MODIFICATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE ADDITION OF WHATEVER TEMPORARY BRACING, GUYS OR TIE DOWNS THAT MAY BE NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR AFTER THE COMPLETION OF THE PROJECT. 6. ALL DIMENSIONS, ELEVATIONS, AND EXISTING CONDITIONS SHOWN ON THE DRAWINGS SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND THE TESTING AGENCY PRIOR TO BEGINNING ANY MATERIALS ORDERING, FABRICATION OR CONSTRUCTION WORK ON THIS PROJECT. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND THE OWNER'S ENGINEER. THE DISCREPANCIES MUST BE RESOLVED BEFORE THE CONTRACTOR IS TO PROCEED WITH THE WORK. THE CONTRACT DOCUMENTS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES. OBSERVATION VISITS TO THE SITE BY THE OWNER AND/OR THE ENGINEER SHALL NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR THE CONSTRUCTION PROCEDURES. 7. ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW AND OF GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY AND ALL SUBSTITUTIONS MUST BE PROPERLY APPROVED AND AUTHORIZED IN WRITING BY THE OWNER AND ENGINEER PRIOR TO INSTALLATION. THE CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF THE MATERIALS AND EQUIPMENT BEING SUBSTITUTED. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR INSURING THAT THIS PROJECT AND RELATED WORK COMPLIES WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL SAFETY CODES AND REGULATIONS GOVERNING THIS WORK. 9. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE LATEST EDITION OF THE LOCAL BUILDING CODE. 10. ACCESS TO THE PROPOSED WORK SITE MAY BE RESTRICTED. THE CONTRACTOR SHALL COORDINATE INTENDED CONSTRUCTION ACTIVITY, INCLUDING WORK SCHEDULE AND MATERIALS ACCESS, WITH THE OWNER FOR APPROVAL. 11. PREFABRICATED BUILDING INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. STRUCTURAL STEEL NOTES: 1. STRUCTURAL STEEL SHALL CONFORM TO THE LATEST EDITION OF THE A.I.S.C. SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS- ALLOWABLE STRESS DESIGN AND PLASTIC DESIGN INCLUDING THE COMMENTARY AND THE A.I.S.C. CODE OF STANDARD PRACTICE. 2. STRUCTURAL STEEL PLATES AND SHAPES SHALL CONFORM TO ASTM A26. ALL STRUCTURAL STEEL PIPES SHALL CONFORM TO ASTM A53 GRADE B. ALL STRUCTURAL STEEL TUBING SHALL CONFORM TO ASTM A500 GRADE B. ALL STRUCTURAL STEEL COMPONENTS AND FABRICATED ASSEMBLIES SHALL BE HOT DIP GALVANIZED AFTER FABRICATION. 3. WELDING SHALL BE IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY (AWS) D.1.1/D1.1M:2010. STRUCTURAL WELDING CODE-STEEL WELD ELECTRODES SHALL BE E70XX. 4. ALL COAXIAL CABLE CONNECTORS AND TRANSMITTER EQUIPMENT SHALL BE AS SPECIFIED BY THE OWNER. THE CONTRACTOR SHALL FURNISH ALL CONNECTION HARDWARE REQUIRED TO SECURE THE CABLES. CONNECTION HARDWARE SHALL BE STAINLESS STEEL. 5. ALL REINFORCING STEEL SHALL CONFORM TO ASTM 615 GRADE 60, DEFORMED BILLET STEEL BARS. WELDED WIRE FABRIC REINFORCING SHALL CONFORM TO ASTM A185. 6. THE FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE LATEST A.I.S.C. SPECIFICATIONS. 7. ALL CONNECTIONS NOT FULLY DETAILED ON THESE PLANS SHALL BE DETAILED BY THE STEEL FABRICATOR IN ACCORDANCE WITH A.I.S.C. SPECIFICATIONS. 8. HOT-DIP GALVANIZE ITEMS SPECIFIED TO BE ZINC-COATED, AFTER FABRICATION WHERE PRACTICAL. GALVANIZING: ASTM A 123, ASTM, A 153/A 153M OR ASTM A 653/A 653M, G90, AS APPLICABLE. 9. REPAIR DAMAGED SURFACES WITH GALVANIZING REPAIR METHOD AND PAINT CONFORMING TO ASTM A 780 OR BY APPLICATION OF STICK OR THICK PASTE MATERIAL SPECIFICALLY DESIGNED FOR REPAIR OF GALVANIZING. CLEAN AREAS TO BE REPAIRED, AND REMOVE SLAG FROM WELDS. HEAT SURFACES TO WHICH STICK OR PASTE MATERIAL IS APPLIED WITH A TORCH TO A TEMPERATURE SUFFICIENT TO MELT THE METALLICS. IN STICK OR PASTE, SPREAD MOLTEN MATERIAL UNIFORMLY OVER SURFACES TO BE COATED AND WIPE OFF EXCESS MATERIAL. 10. CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S INSTRUCTIONS/SPECIFICATIONS IF NO INFORMATION IS CONTAINED IN THESE PLANS OR IF THE MANUFACTURER'S SPECIFICATIONS ARE STRICTER. NOTE: REFER TO DUKE ENERGY SPECIFICATIONS AS THE CONTROLLING STANDARD FOR PROPOSED CONSTRUCTION. PERMITS: 1. CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS FOR THIS PROJECT FROM ALL APPLICABLE GOVERNMENTAL AGENCIES. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ABIDING BY ALL CONDITIONS AND REQUIREMENTS OF THE PERMITS. 3. ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES AND THE ACI 318-08, "BUILDING REQUIREMENTS FOR STRUCTURAL CONCRETE". 4. THE CONTRACTOR SHALL NOTIFY THE APPLICABLE JURISDICTIONAL (STATE, COUNTY OR CITY) ENGINEER 24 HOURS PRIOR TO THE BEGINNING OF CONSTRUCTION. 5. ALL DIMENSIONS SHALL BE VERIFIED WITH THE PLANS (LATEST REVISION) PRIOR TO COMMENCING CONSTRUCTION. NOTIFY THE OWNER IMMEDIATELY IF DISCREPANCIES ARE DISCOVERED. THE CONTRACTOR SHALL HAVE A SET OF APPROVED PLANS AVAILABLE AT THE SITE AT ALL TIMES WHEN WORK IS BEING PERFORMED. A DESIGNATED RESPONSIBLE EMPLOYEE SHALL BE AVAILABLE FOR CONTACT BY GOVERNING AGENCY INSPECTORS. MISCELLANEOUS: 1. ALL THREADED STRUCTURAL FASTENERS FOR ANTENNA SUPPORT ASSEMBLES SHALL CONFORM TO ASTM A307 OR ASTM 36. ALL STRUCTURAL FASTNERS FOR STRUCTURAL STEEL FRAMING SHALL CONFORM TO ASTM A325. FASTENERS SHALL BE 5/8" MIN. DIA. BEARING TYPE CONNECTIONS WITH THREADS EXCLUDED FROM THE PLANE. ALL EXPOSED FASTENERS, NUTS, AND WASHERS SHALL BE GALVANIZED UNLESS OTHERWISE NOTED. ALL ANCHORS INTO CONCRETE SHALL BE STAINLESS STEEL. 2. THE CONTRACTOR SHALL FURNISH ALL CONNECTION HARDWARE REQUIRED TO SECURE THE CABLES. CONNECTION HARDWARE SHALL BE STAINLESS STEEL. 3. NORTH ARROW SHOWN ON PLANS REFERS TO TRUE NORTH. CONTRACTOR SHALL VERIFY NORTH AND NOTIFY CONSULTANT OF ANY DISCREPANCY BEFORE STARTING CONSTRUCTION. 4. PROVIDE LOCK WASHERS FOR ALL MECHANICAL CONNECTIONS FOR GROUND CONDUCTORS. USE STAINLESS STEEL HARDWARE THROUGHOUT. 5. THOROUGHLY REMOVE ALL PAINT AND CLEAN ALL DIRT FROM SURFACES REQUIRING GROUND CONNECTIONS. 6. MAKE ALL GROUND CONNECTIONS AS SHORT AND DIRECT AS POSSIBLE. AVOID SHARP BENDS. ALL BENDS TO BE A MIN. OF 8" RADIUS. 7. FOR ALL EXTERNAL GROUND CONNECTIONS, CLAMPS AND CADWELDS, APPLY A LIBERAL PROTECTIVE COATING OR AN ANTI-OXIDE COMPOUND SUCH AS 'NO-OXIDE A' BY DEARBORN CHEMICAL COMPANY. 8. REPAIR ALL METAL SURFACES THAT HAVE BEEN CUT OR DAMAGED BY REMOVING ANY EXISTING RUST AND APPLYING COLD GALVANIZATION. 9. ANTENNA CABLE LENGTHS HAVE BEEN DETERMINED BASED ON THESE PLANS. CABLE LENGTHS LISTED ARE APPROXIMATED AND ARE NOT INTENDED TO BE USED FOR FABRICATION. DUE TO FIELD CONDITIONS, ACTUAL CABLE LENGTHS VARY. CONTRACTOR MUST FIELD VERIFY ANTENNA CABLE LENGTHS PRIOR TO ORDER. 39 T-1.2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GENERAL NOTES FENCE M X G CONTOUR LINE PROPERTY LINE/ROW LEASE AREA EASEMENT DISCONNECT SWITCH METER CIRCUIT BREAKER CODED NOTE NUMBER CHEMICAL GROUND ROD GROUND ROD GROUND ROD W/ INSPECTION SLEEVE CADWELD TYPE CONNECTION COMPRESSION TYPE CONNECTION GROUND WIRE xxxxxxxxxx SYMBOL LEGEND:ABBREVIATIONS : A.B. ANCHOR BOLT AGL ABOVE GROUND LEVEL AMSL ABOVE MEAN SEA LEVEL APPROX APPROXIMATE ASR ANTENNA STRUCTURE REGISTRATION ATS AUTOMATIC TRANSFER SWITCH AWG AMERICAN WIRE GAUGE BCW BARE COPPER WIRE BTCW BARE TINNED COPPER WIRE CGB COAX GROUND BAR (SHELTER) CGBE COAX GROUND BAR EXTERIOR CLR CLEAR COMM COMMUNICATIONS COND CONDUIT CU COPPER DET DETAIL DIA DIAMETER DV DIVERSITY DWG DRAWING EGB EXTERIOR GROUND BAR EL= ELEVATION EQUALS (AMSL, UNLESS OTHERWISE NOTED) EQUIP EQUIPMENT EW EACH WAY EXP EXPANSION FDN FOUNDATION FFE FINISHED FLOOR ELEVATION FLEX FLEXIBLE FOC FIBER OPTIC CABLE GA GAUGE GALV GALVANIZED GEN GENERATOR GCFI GROUND FAULT CIRCUIT INTERRUPTER HDPE HIGH DENSITY POLYETHYLENE HVAC HEATING, VENTILATION, & AIR CONDITIONING I.D. INTERIOR DIAMETER IGB INTERMEDIATE GROUND BAR IGR INTERIOR GROUND RING (SHELTER) kVA KILOVOLT AMPERES LMR LAND MOBILE RADIO LPG LIQUID PETROLEUM GAS MAS MULTIPLE ADDRESS (RADIO) SYSTEM MAX MAXIMUM MGB MASTER GROUND BAR MIN MINIMUM MISC MISCELLANEOUS MTS MANUAL TRANSFER SWITCH MW MICROWAVE MW-DV MICROWAVE DIVERSITY PLCS PLACES PSI POUNDS per SQUARE INCH PVC POLYVINYL CHLORIDE (CONDUIT) REQ'D REQUIRED RGS RIGID GALVANIZED STEEL (CONDUIT) SCHED SCHEDULE SCHEM SCHEMATIC SYS SYSTEM T&B TOP & BOTTOM TBD TO BE DETERMINED TELCO TELEPHONE COMPANY TGB TOWER GROUND BAR T.O.C. TOP OF CONCRETE T.O.S. TOP/TOE OF SLOPE TYP TYPICAL XFMR TRANSFORMER 40 41 42 op op op op op op op op op op op op op op op op op op op op UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP G C-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER ENLARGED SITE PLAN 10'010' 5' SCALE: 1"=5' (22X34) 1"=10' (11X17) EXISTING TREES TO BE REMOVED WITHIN COMPOUND AND EASEMENT. CONTRACTOR TO FIELD VERIFY BEFORE CONSTRUCTION EXISTING GENERATOR ON CONCRETE PAD EXISTING LP TANK EXISTING UNDERGROUND POWER (TYP) EXISTING EDGE OF GRAVEL EXISTING TREELINE EXISTING ICE BRIDGE PROPOSED 120' MONOPOLE PROPOSED ±19' ICE BRIDGE (TYP) EXISTING SELF SUPPORT TOWER EXISTING 18' WIDE ASPHALT DRIVE EXISTING OVERHEAD POWER LINE (TYP) EXISTING DUKE ENERGY EQUIPMENT SHELTER CONTRACTOR TO CUT OPENING AND INSTALL COAX HATCH PLATE ON SIDE OF EXISTING SHELTER 43 C-2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER PROPOSED MONOPOLE PROPOSED 10' LIGHTNING ROD TOWER ELEVATION 16'016' 8' SCALE: 1"=8' (22X34) 1"=16' (11X17) TOP OF PROPOSED TOWER ELEV.: 120'-0" AGL TOTAL TOWER HEIGHT INCLUDING APPURTENANCES ELEV.: 130'-0" AGL PROPOSED DUKE ANTENNA MOUNT ELEV.: 117'-0" AGL PROPOSED DUKE ANTENNA ELEV.: 122'-6" AGL PROPOSED DUKE ANTENNA ELEV.: 102'-6" AGL PROPOSED DUKE ANTENNA MOUNT ELEV.: 97'-0" AGL 44 C-2.1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER TOWER DESIGN 45 C-2.2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER TOWER DESIGN 46 C-3 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER CONSTRUCTION DETAILS 2'-0" 7'-0" CLEAR4'-0" 4" (MAX.) 12" 3000 PSI CONCRETE CRUSHED STONE ON OTHER SURFACE 1/2" CROWN TOP 3 1/2"GALVANIZED PIPE. 8'-0" MAXIMUM SPACING. PLACE EACH ON ALTERNATE SIDE OF BRIDGE. NEW DC AND FIBER CABLES CLAMPED TO UNISTRUT 2"X2" HD. G. UNISTRUT @ 3'-0" O.C. MAX. 2"X2" HD. G. UNISTRUT @ 3'-0" O.C. MAX. WAVEGUIDE BRIDGE SUPPORT BRACKET NEW GPS ANTENNA 2ICE BRIDGE CABLE DETAIL SCALE: NOT TO SCALE ICE BRIDGE NOTE: ·PRIOR TO CONSTRUCTION FIELD COORDINATE HEIGHT AND ROUTE OF ICE BRIDGE WITH TOWER OWNER ·ALL SUPPORT POSTS MUST BE GROUNDED 1GPS ANTENNA MOUNTING DETAIL SCALE: NOT TO SCALE GPS 1.32" O.D. x 14" MAX. MOUNTING PIPE 1/2"Ø BOLT (TYP.) GPS MOUNT ON SWIC WALL CABLES (PROVIDED W/ ANTENNA) ESTABLISH CONNECTION AND PROVIDE WEATHERPROOF KIT NOTES: 1. LOCATION OF GPS MUST HAVE CLEAR VIEW OF SOUTHERN SKY AND CANNOT HAVE ANY BLOCKAGES EXCEEDING 25% OF THE SURFACE AREA OF A HEMISPHERE AROUND THE GPS. 2. ALL GPS LOCATIONS MUST BE ABLE TO RECEIVE CLEAR SIGNALS FROM A MINIMUM OF FOUR (4) SATELLITES. VERIFY WITH HANDHELD GPS BEFORE FINAL LOCATION OF GPS. 47 S-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER TOWER DETAILS TOWER ELEVATION DETAIL 1 GENERAL CONSTRUCTION NOTES: INSTALLATION NOTES: 48 op op op op op op op op op op op op op op op op op op op T UGP UGP UGP UGP UGP UGP UGP UNDERGROUND POWER (RED PAINT, MARKED BY OTHERS) POWER BOX ON CONCRETE PAD T T UNDERGROUND COMMUNICATION (ORANGE PAINT, MARKED BY OTHERS) UGP UNDERGROUND POWER (RED PAINT, MARKED BY OTHERS) UNDERGROUND GAS (YELLOW PAINT, MARKED BY OTHERS) UTILITY/METER RACK 18' WIDE ASPHALT DRIVE E-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER OVERALL UTILITY PLAN 50'050' 25' SCALE: 1"=25' (11X17) 1"=50' (22X34) PROPOSED 120' MONOPOLE PROPOSED ±19' ICE BRIDGE (TYP) EXISTING POWER POLE (TYP) EXISTING TELCO PEDESTAL (TYP) EXISTING SELF SUPPORT TOWER EXISTING LP TANK EXISTING TREELINE EXISTING OVERHEAD POWER LINE (TYP) EXISTING DUKE ENERGY EQUIPMENT SHELTER 2-2" PVC FROM SERVICE POLE TO HANDHOLE PLACED WITHIN 5' OF SERVICE POLE . 1-4" PVC FROM HANDHOLE TO 12"x12"x6" JUNCTION BOX AT SHELTER WITH TRACER WIRE AND PULL STRING 12"x12"x6" PVC JUNCTION BOX AT BUILDING. WITH 1-4" PENETRATION TO SHELTER 2-2" PVC FROM SERVICE POLE TO HANDHOLE PLACED WITHIN 5' OF SERVICE POLE . 1-4" PVC FROM HANDHOLE TO 12"x12"x6" JUNCTION BOX AT SHELTER WITH TRACER WIRE AND PULL STRING 49 G-1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GROUNDING SITE PLAN 1 2 4 10'010' 5' SCALE: 1"=5' (22X34) 1"=10' (11X17) EXISTING GENERATOR ON CONCRETE PAD EXISTING LP TANK EXISTING EDGE OF GRAVEL EXISTING TREELINE EXISTING ICE BRIDGE PROPOSED 120' MONOPOLE PROPOSED ±19' ICE BRIDGE (TYP) EXISTING SELF SUPPORT TOWER EXISTING DUKE ENERGY EQUIPMENT SHELTER 3 6 1GROUNDING SITE PLAN SCALE: AS NOTED 10 5 9 50 G-2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GROUNDING DETAILS & NOTES SCALE: N.T.S.1 CADWELD GROUNDING CONNECTION DETAILS SCALE: N.T.S.2 ANTENNA & CABLE GROUNDING SCALE: N.T.S.5 GROUNDING STRAP WEATHERPROOFING DETAIL SCALE: N.T.S.6 TYPICAL GROUND BAR CONNECTION DETAIL SCALE: N.T.S.4 GENERAL LUG DETAIL SCALE: N.T.S.3 GROUNDING ROD DETAIL 51 G-2.0.1 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GROUNDING DETAILS & NOTES NOTCH SIDES OF 8" PVC SCH 40 PIPE TO ALLOW EXIT/ENTRANCE OF GROUND RINGGROUND RING 5/8"x10' GROUND ROD TRENCH BOTTOM FINISHED GRADE GALV. STEEL Ø .469x.719 TYP (41) PL Ø .469x.719 TYP (41) PL 1 BOLT TO ANGLE IRON (OR TOWER LEG) HARDWARE 2 GROUNDING CONDUCTORS CONTINUED TO GROUND LOOP SEE PLAN TOP OF CRUSHED STONE ANTENNA CABLES TOWER MOUNTING PLATE FOR GROUND BAR (TO SUIT) STAND-OFF INSULATORS (2)-#2/0-19 STRANDED TINNED COPPER GROUND WIRE IN PVC SCH. 40 CONDUIT (TYP). EXTEND CONDUIT 6" BELOW GRADE. GROUND WIRE TO BUS BAR #2/0-19 STRANDED TINNED COPPER GROUND WIRE NOTE: ALL ICE BRIDGE POSTS. EXTEND CONCRETE TO 6" ABOVE GRADE AND CROWN TOP CONDUIT STRAPS TO SUIT GK-GROUND KIT BASE OF TOWER. 1/4"x4"x20" LG COPPER BUS BAR (SEE DETAIL) #2/0-19 STRANDED TINNED COPPER GROUND WIRE ICE BRIDGE POST (TYP) JUMP ICE BRIDGE SECTIONS. UTILIZE #2 SOLID TINNED HYPRESS LUGS ON BOTH SIDES WITH DOUBLE BOLT CONNECTIONS (TYP)NEW ICE BRIDGE ANTENNA CABLES JUMP ICE BRIDGE SECTIONS. UTILIZE #2 SOLID TINNED (TYP) GK-GROUND KIT EXTERIOR COPPER BUS BAR 45° EXIT OUT OF BUILDING SLEEVED IN 3/4" PVC SCH. 40 CONDUIT, 18" BELOW GRADE ALL GROUND LEADS GOING BELOW GRADE NEED SLEEVED USE VSC-1T-V3C VERTICAL CADWELD MOLD REDCAUTIONCAUTIONCAUTION BURIED ELECTRIC LINE BELOW ORANGECAUTIONCAUTIONCAUTION BURIED TELEPHONE LINE BELOW TOP OF COMPOUND STONE DIRECT BURIAL CABLE OR CONDUIT (POWER, CONTROL, TELEPHONE, TELEMETERING, ETC) INSTALLATION 1. THE TAPE SHALL BE LAID DIRECTLY ABOVE THE CABLE OR CONDUIT UNDER RIGID TYPE AND OIL MAT PAVEMENTS, AND DIRECTLY ON TOP OF THE COMPACTED EARTH SUBGRADE IMMEDIATELY BEFORE RESTORING THE PAVEMENT. 2. IN OPEN AREAS, THE TAPE SHALL BE LAID DURING THE BACKFILLING OPERATION ON SMOOTH, COMPACTED BACKFILL AT A DISTANCE OF 8" BELOW THE SURFACE OF THE AREA. 3. THE ENDS OF THE TAPE SHALL BE LAPPED APPROXIMATELY SIX (6) INCHES. 4. TAPE SHALL BE THE COLOR AS INDICATED AND HAVE THE FOLLOWING MARKINGS: #2 STRANDED COPPER WIRE CADWELD WIRE TO POSTS SCALE: N.T.S.5 TOWER LEG BUS BAR DETAIL SCALE: N/A7 NOT USED SCALE: N.T.S.6 STANDARD MARKER TAPE DETAIL SCALE: N.T.S.3 INSPECTION WELL DETAIL SCALE: N.T.S.2 NOT USED SCALE: N.T.S.1 COAXIAL GROUNDING AT ICE BRIDGE SCALE: N.T.S.4 NOT USED ELECTRIC MOTION CO., INC. 110 GROPPO DR./ BOX 626 WINSTED, CT 06098 PART #EM SGM420-BI-NR 203-009-0118-0002"x2" INSULATOR; FIBERGLASS2 1 ITEM 02-009-0672-000 PART NO. 1 20" GROUND BAR; TINNED OR COPPER DESCRIPTIONREQ CAP FENCE GROUNDING REQUIREMENTS WILL VARY BY OWNER. SOME MAY OR MAY NOT REQUIRE FABRIC GROUNDING. 52 G-2.0.2 IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER: ISSUED FOR: REV DESCRIPTION BY DATE A CLIENT REVIEW CLW 04/05/24 SMW JOB #21-2705.1 SITE ADDRESS 100 BAD CREEK RD SALEM, SC 29676 0 CONSTRUCTION CLW 05/17/24 09/12/2024 1 CONSTRUCTION AMD 09/12/24 158 BUSINESS CENTER DRIVE BIRMINGHAM, AL 35244 TEL: 205-252-6985 www.smweng.com ENGINEERING GROUP, LLC TOGETHER PLANNING A BETTER TOMORROW DUKE ENERGY ID NUMBER LA-SC-617 DUKE ENERGY SITE NAME BAD CREEK HYDRO REPEATER GROUNDING DETAILS & NOTES GN-2 ANTENNA FEEDLINE GROUND KITS ANTENNA FEEDLINE GROUND KITS ANTENNA FEEDLINE GROUND KITS #6 AWG #6 AWG #6 AWG ANTENNA FEEDLINE GROUND KITS ANTENNA FEEDLINE GROUND KITS #6 AWG #6 AWG ANTENNA FEEDLINE GROUND KITS WAVEGUIDE FEEDLINE GROUND KITS AND COAX SURGE SUPRESSORS AC UNITS TGB IGB EGB CGB MGB #6 AWG COMM CABINETS TOWER CGBE BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW BTCW 10 FT LIGHTNING ROD CABINETS TIE-DOWN PLATES, TYP 4 PLCS ICE BRIDGE SUPPORTS #6 AWG #2/0 THHN THHN BTCW DISC SW M CONDUITS (IF METAL) #2 THHN EXISTING FENCES, GATES, ETC. PROPANE TANK & GENERATOR GROUND LUGS GENERAL NOTES: 1. FOR LEGEND AND ABBREVIATIONS SEE GN-2 SCHEMATIC DIAGRAM - GROUNDING SYSTEM NOTES: 1. #2/0 19 STRAND BARE TINNED COPPER WIRE (BTCW) UNLESS OTHERWISE NOTED. 2. BOND ANTENNA FEED LINE GROUND KIT CABLE TO GROUND BAR (SEE SHEET G-2). 3. PROVIDE STRANDED BTCW BURIED GROUND SYSTEM W/ GROUND RODS (SEE SHEET G-1). 4. LIGHTNING ROD GROUND LEADS SHALL BE CONNECTED TO THE TGB. 5. AN INTERMEDIATE GROUND BAR MAY BE USED WHERE ONE OR MORE ANTENNAS ARE GROUNDED AT THE SAME NOMINAL ELEVATION (SEE SHEET G-2). 6. ALL CONNECTIONS TO THE EARTH GROUND SYSTEM TO BE MADE WITH EXOTHERMIC WELDS. 7. ALL ABOVE GROUND LEADS SHALL BE PROTECTED BY PVC CONDUIT. NEW GROUNDNOTE 3 NOTE 6 BTCW NOTE 5 ANTENNA #1 NOTE 2 ANTENNA #2 NOTE 2 ANTENNA #__ NOTE 2 53 Mail Processing Center Federal Aviation Administration Southwest Regional Office Obstruction Evaluation Group 10101 Hillwood Parkway Fort Worth, TX 76177 Aeronautical Study No. 2024-ASO-2171-OE Page 1 of 4 Issued Date: 03/25/2024 Kevin Hursey Duke Energy Business Services, LLC 9700 David Taylor Dr. Charlotte, NC 28202 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Antenna Tower Bad Creek Hydro Repeater Location: Salem, SC Latitude: 35-01-05.48N NAD 83 Longitude: 83-00-35.25W Heights: 2456 feet site elevation (SE) 124 feet above ground level (AGL) 2580 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: Based on this evaluation, marking and lighting are not necessary for aviation safety. However, if marking/ lighting are accomplished on a voluntary basis, we recommend it be installed in accordance with FAA Advisory circular 70/7460-1 M. This determination expires on 09/25/2025 unless: (a) the construction is started (not necessarily completed) and FAA Form 7460-2, Notice of Actual Construction or Alteration, is received by this office. (b) extended, revised, or terminated by the issuing office. (c) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE E-FILED AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. AFTER RE-EVALUATION OF CURRENT OPERATIONS IN THE AREA OF THE STRUCTURE TO DETERMINE THAT NO 54 Page 2 of 4 SIGNIFICANT AERONAUTICAL CHANGES HAVE OCCURRED, YOUR DETERMINATION MAY BE ELIGIBLE FOR ONE EXTENSION OF THE EFFECTIVE PERIOD. This determination is based, in part, on the foregoing description which includes specific coordinates, heights, frequency(ies) and power. Any changes in coordinates, heights, and frequencies or use of greater power, except those frequencies specified in the Colo Void Clause Coalition; Antenna System Co-Location; Voluntary Best Practices, will void this determination. Any future construction or alteration, including increase to heights, power, or the addition of other transmitters, requires separate notice to the FAA.This determination includes all previously filed frequencies and power for this structure. If construction or alteration is dismantled or destroyed, you must submit notice to the FAA within 5 days after the construction or alteration is dismantled or destroyed. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Communications Commission (FCC) because the structure is subject to their licensing authority. If we can be of further assistance, please contact Robert Kiser, at (404) 305-6616, or Robert.K- CTR.Kiser@faa.gov. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2024-ASO-2171-OE. Signature Control No: 610979739-616417461 ( DNE ) Eric F Johnston Manager, Obstruction Evaluation Group Attachment(s) Frequency Data Map(s) cc: FCC 55 Page 3 of 4 Frequency Data for ASN 2024-ASO-2171-OE LOW FREQUENCY HIGH FREQUENCY FREQUENCY UNIT ERP ERP UNIT 6 7 GHz 55 dBW 6 7 GHz 42 dBW 10 11.7 GHz 55 dBW 10 11.7 GHz 42 dBW 614 698 MHz 1000 W 614 698 MHz 2000 W 698 806 MHz 1000 W 806 901 MHz 500 W 806 824 MHz 500 W 824 849 MHz 500 W 851 866 MHz 500 W 869 894 MHz 500 W 896 901 MHz 500 W 901 902 MHz 7 W 929 932 MHz 3500 W 930 931 MHz 3500 W 931 932 MHz 3500 W 932 932.5 MHz 17 dBW 935 940 MHz 1000 W 940 941 MHz 3500 W 56 Page 4 of 4 Sectional Map for ASN 2024-ASO-2171-OE 57 1 BUILDING A SMARTER ENERGY FUTURE® 9700 David Taylor Dr. Charlotte, NC 28262 704-382-3242 August 16, 2024 James Coley, Director Oconee County Planning and Zoning 415 S. Pine Street Walhalla, SC 29691 Phone: (864) 638.4218 Subject: Duke Energy Bad Creek Abandonment letter Dear: Oconee County Duke Energy is requesting the installation of a Telecommunications Pole to the existing Bad Creek site. This project supports Duke Energy's local generation plant radio system for safe and secure operations of the plant. In the event the pole is abandoned, Duke Energy will remove the pole within 120 days of notice requiring approval per the jurisdiction’s requirements. If a shorter period is requested for the removal of the pole Duke Energy will work with the jurisdiction’s officials at the time to work out a timeline that works for both parties. Sincerely, Patrick Bernier, PE Senior Project Manager 58 Holder Identifier : 7777777707070700077763616065553330752417777215477407763224763517120070641466265211110760405475277575007606414223411112074675142072666750762516202760311007620403750767102077727252025773110777777707000707007 6666666606060600062606466204446200602222606004022206222004260062002062222040600600220620220626204200006202206262240220060200042622600220622020426204002206222026040062002066646062240664440666666606000606006Certificate No : 570107789502 CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) 08/26/2024 IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. PRODUCER Aon Risk Services South, Inc. Charlotte NC Office MSC# 17693 PO Box 551343 Atlanta GA 30355 USA PHONE (A/C. No. Ext): E-MAIL ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # (866) 283-7122 INSURED 33600LM Insurance CorporationINSURER A: 23035Liberty Mutual Fire Ins CoINSURER B: 21458Employers Insurance Company of WausauINSURER C: AA3191004Bison Insurance Company LtdINSURER D: INSURER E: INSURER F: FAX (A/C. No.): (800) 363-0105 CONTACT NAME: Duke Energy Corporation 525 South Tryon Street Mail Code DEP 16A Attn Lance Burnette Charlotte NC 28202 USA COVERAGES CERTIFICATE NUMBER: 570107789502 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Limits shown are as requested POLICY EXP (MM/DD/YYYY) POLICY EFF (MM/DD/YYYY) SUBR WVD INSR LTR ADDL INSD POLICY NUMBER TYPE OF INSURANCE LIMITS COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR POLICY LOC EACH OCCURRENCE DAMAGE TO RENTED PREMISES (Ea occurrence) MED EXP (Any one person) PERSONAL & ADV INJURY GENERAL AGGREGATE PRODUCTS - COMP/OP AGG X X X GEN'L AGGREGATE LIMIT APPLIES PER: $2,000,000 $1,000,000 $10,000 $2,000,000 $4,000,000 $4,000,000 D 09/01/2024 09/01/2025BISON2024XS PRO- JECT OTHER: AUTOMOBILE LIABILITY ANY AUTO OWNED AUTOS ONLY SCHEDULED AUTOS HIRED AUTOS ONLY NON-OWNED AUTOS ONLY BODILY INJURY ( Per person) PROPERTY DAMAGE (Per accident) X X BODILY INJURY (Per accident) $2,000,000D 09/01/2024 09/01/2025 CLAIMS-MADE COMBINED SINGLE LIMIT (Ea accident) BISON2024XS EXCESS LIAB X OCCUR CLAIMS-MADE AGGREGATE EACH OCCURRENCE DED $1,000,000 $1,000,000 09/01/2024UMBRELLA LIABD 09/01/2025BISON2024XS RETENTION X E.L. DISEASE-EA EMPLOYEE E.L. DISEASE-POLICY LIMIT E.L. EACH ACCIDENT $2,000,000 X OTH- ER PER STATUTEC 09/01/2024 09/01/2025 AOS BISON2024XSD 09/01/2024 09/01/2025 $2,000,000 Y / N (Mandatory in NH) ANY PROPRIETOR / PARTNER / EXECUTIVE OFFICER/MEMBER EXCLUDED? N / AN EL-NC,SC,OH,IN,FL,TN,KY WORKERS COMPENSATION AND EMPLOYERS' LIABILITY If yes, describe under DESCRIPTION OF OPERATIONS below $2,000,000 WCC641443955024 Employers LiabilityEW264N443955064 09/01/2024 09/01/2025 IN, KY, NC, OH, SC, TN Excess Workers CompensationB SIR applies per policy terms & conditions $1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) As respects BISON2024XS, Aon Commercial Risk (U.S.) is generating and distributing this certificate in an administrative capacity. Coverage is Independently Procured by the Insured. Aon Insurance Managers is the Insurance Manager and/or authorized representative. Where delineated to provide additional insured and/or waiver of subrogation for coverages, the insurance programs respond in accordance with written contract. Insurance policies include certificate holder as additional insured and waiver of subrogation where required by written contract, subject to the terms and conditions of the policy. CANCELLATIONCERTIFICATE HOLDER AUTHORIZED REPRESENTATIVE Duke Energy Corporation 525 South Tryon Street Mail Code DEP 16A Charlotte NC 28202 USA ACORD 25 (2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 59 AGENCY CUSTOMER ID: ADDITIONAL REMARKS SCHEDULE LOC #: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: ACORD 25 FORM TITLE: Certificate of Liability Insurance EFFECTIVE DATE: CARRIER NAIC CODE POLICY NUMBER NAMED INSUREDAGENCY See Certificate Number: See Certificate Number: 570107789502 570107789502 Aon Risk Services South, Inc. 570000019981 ADDITIONAL POLICIES If a policy below does not include limit information, refer to the corresponding policy on the ACORD certificate form for policy limits. INSURER INSURER INSURER INSURER INSURER(S) AFFORDING COVERAGE Page _ of _ NAIC # Duke Energy Corporation TYPE OF INSURANCE POLICY NUMBER LIMITS OTHER A Miscellaneous Liability Coverages EW564N443955054 09/01/2024 09/01/2025 Employers Liability $1,000,000 Excess WC - FL ADDL INSD INSR LTR SUBR WVD POLICY EFFECTIVE DATE (MM/DD/YYYY) POLICY EXPIRATION DATE (MM/DD/YYYY) SIR applies per policy terms & conditions ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD 60 Bad Creek Repeater Indemnity Letter Duke Energy Carolinas, LLC (“Duke Energy”), plans to build and operate a communications tower located at 100 Bad Creek Road, Salem, SC 29676 (Parcel ID: 016-00-01-013) (the “Tower”). To the extent permitted by law, Duke Energy shall indemnify and hold the County of Oconee (“Oconee”) harmless from all liabilities, costs, damages, expenses, claims, demands, or judgments, including without limitation, court costs and reasonable attorney’s’ fees, incurred by Oconee in defense of any claim or action brought against Oconee by an unrelated third party for injury to persons or property resulting directly from Duke Energy’s negligence or intentional misconduct while constructing or operating the Tower. In witness hereof, Duke Energy has caused this Indemnification Letter to be duly executed by the authorized signature below. By: Name: Title: Kevin L. Lee Manager, Real Estate II 61 Official Copy FCC 854R UNITED STATES OF AMERICA FEDERAL COMMUNICATIONS COMMISSION ANTENNA STRUCTURE REGISTRATION OWNER: FCC Registration Number (FRN): Antenna Structure Registration Number Issue Date Location of Antenna Structure County: Ground Elevation (AMSL) meters Overall Height Above Ground (AGL) meters Latitude Longitude NAD83 Overall Height Above Mean Sea Level (AMSL) meters Center of Array Coordinates Type of Structure Painting and Lighting Requirements: Conditions: This registration is effective upon completion of the described antenna structur e and notification to the Commission. YOU MUST NOTIFY THE COMMISSION WITHIN 5 DAYS OF COMPLETION OF CONSTRUCTION OR CANCELLATION OF YOUR PROJECT, please file FCC Form 854. To file electronically, connect to the antenna structure registration system by pointing your web browser to https://www.fcc.gov/antenna-structure-registration. Electronic filing is required. Use purpose code “NT” for notification of completion of construction; use purpose code “CA” to cancel yo ur registration. The Antenna Structure Registration is not an authorization to construct radio facilities or transmit radio signals. It is necessary that all radio equipment on this structure be covered by a valid FCC license or construction permit. You must immediately provide a copy of this Registration to all tenant licensees and permittees sited on the structure described on this Registration (although not required, you may want to use Certified Mail to obtain proof of receipt), and display your Registration Number at the site. See reverse for important information about the Commission’s Antenna Structure Registration rules. Duke Energy Business Services, LLC 0020991360 1328116 06/17/2024 Salem, SC 29676 Northeast of the existing tower off of Bad Creek Road OCONEE 35- 01- 05.5 N 083- 00- 35.2 W MTOWER FAA Chapters NONE Monopole Page 1 of 2 ATTN: Telecommunications Div, CS03A Duke Energy Business Services, LLC 401 South College Street Charlotte, NC 28202 748.6 37.8 786.4 N/A June 2021 62 Official Copy FCC 854R You must comply with all applicable FCC obstruction marking and lighting requirements, as set forth in Part 17 of the Commission’s Rules (47 C.F.R. Part 17). These rules include, but are not limited to: • Posting the Registration Number: The Antenna Structure Registration Number must be displayed in a conspicuous place so that it is readily visible near the base of the antenna structure. Materials used to display the Registration Number must be weather-resistant and of sufficient size to be easily seen at the base of the antenna structure. Exceptions exist for certain historic structures. See 47 C.F. R. 17.4(g)-(h). • Inspecting lights and equipment: The obstruction lighting must be observed at least every 24 hours in order to detect any outages or malfunctions. Lighting equipment, indicators, and associated devices must be inspected at least once every three months. • Reporting outages and malfunctions: When any top steady-burning light or a flashing light (in any position) burns out or malfunctions, the outage must be reported to the nearest FAA Flight Service Station, unless corrected within 30 minutes. The FAA must again be notified when the light is restored. The owner must also maintain a log of these outages and malfunctions. • Maintaining assigned painting: The antenna structure must be repainted as often as necessary to maintain good visibility. • Complying with environmental rules: If you certified that grant of this registration would not have a significant environmental impact, you must nevertheless maintain all pertinent records and be ready to provide documentation supporting this certification and compliance with the rules, in the event that such information is requested by the Commission pursuant to 47 C.F.R. 1.1307(d). • Updating information: The owner must notify the FCC of proposed modifications to this structure; of any change in ownership; or, within 30 days of dismantlement of the structure. Copies of the Code of Federal Regulations (which contain the FCC’s antenna structure registration rules, 47 C.F.R Part 17) are available from the Government Printing Office (GPO). To purchase CFR volumes, call (202) 512-1800. For GPO Customer Service, call (202) 512-1803. For additional FCC information, consult the Antenna Homepage on the internet at https://www.fcc.gov/antenna-structure-registration or call (877) 480-3201 (TTY 717-338-2824). Page 2 of 2 June 2021 63 1 BUILDING A SMARTER ENERGY FUTURE® 9700 David Taylor Dr. Charlotte, NC 28262 704-382-3242 August 12, 2024 James Coley, Director Oconee County Planning and Zoning 415 S. Pine Street Walhalla, SC 29691 Phone: (864) 638.4218 Subject: Duke Energy Bad Creek Zoning RF letter Dear: Oconee County Duke Energy is requesting the installation of a Telecommunications System to the existing generation facility at Bad Creek. This project supports Duke Energy's local generation plant radio system for safe and secure operations of the plant. Duke Energy makes the following statements for this telecommunications system: 1. lt shall at all times and without exception, be maintained in a safe manner and in compliance with all conditions for permits and authorizations. 2. lt shall at all times be operated and maintained in compliance with the Federal, State and local laws, codes, ordinances, rules and regulations. 3. lt shall at all times stay within Federal Communications Commission rules and regulations for Radio Frequency Systems, including FCC standards part 15 for unlicensed radio frequency. Sincerely, Patrick Bernier, PE Senior Project Manager 64 1 BUILDING A SMARTER ENERGY FUTURE® 9700 David Taylor Dr. Charlotte, NC 28262 704-382-3242 February 14, 2025 Oconee County Re: Bad Creek Repeater - Communication Pole Statement of Need Dear Oconee County: The purpose of this letter is to convey the need for a replacement pole at the Bad Creek Repeater site, 100 Bad Creek Rd, Salem, NC 29676. The proposed monopole, at its height and location, is critical for the continued connectivity of the Duke Energy system. Duke Energy is in the process of replacing older, outdated, and failing infrastructure across all jurisdictional areas, and adding infrastructure in areas that would benefit not only Duke Energy, but also the public. There is only one tower within 4 nautical miles (4.6 miles)(Greater than the 1,300’ radius required by the UDO) per the FAA’s Circle Search Tool. This is Duke’s Bad Creek Self-support which was previously permitted by the County. Its information is listed below: Self-Support Tower (375' AGL) 35°01'22.82"N 83°01'15.16"W Site Elevation: 2595' Owned by Duke Energy ASR 1321649 3,752’ Separation Duke Energy prefers not to collocate on others towers as it reduces the security level we maintain on owned towers. Colocation may impact the service we are able to provide internally due to no -optimal antenna heights and ground spaces. To lower risk Duke Energy designs new towers to standards above those commonly used by the commercial industry, leased towers may not be designed to the same standards and modifications to existing towers may not bring them to our standards. Additionally, Duke Energy maintains its own tower fleet and can verify their loading and history, lowering risk during weather events. Leased towers cannot be fully verified for the proper maintenance during the life of the structure. As vital infrastructure to our customers, we place the highest priority on the best practices, which is why colocation is not feasible unless absolutely necessary . The existing tower on-site is End of Life. It is severely outdated in its design, life-span and structural capacity and needs to be replaced. While Duke’s nearby self-support took on many of the functions previously provided by this tower, it is not located to provide coverage of the nearby plant. This monopole serves to fill that gap and provide plant radio functionality to the nearby facility. The existing outdated self-support tower will be removed once the monopole is constructed and the plant radios are cut-over to the new monopole. The new tower will be an important part of Duke Energy’s day-to-day operations and is part of their fundamental physical infrastructure. This communication tower supports Duke Energy’s commitment to providing their customers with safe, reliable, affordable, and increasingly clean energy in Oconee County, and throughout Duke Energy’s service area. Sincerely, Patrick Bernier, PE Senior Project Manager 65 August 1, 2024 Elizabeth Van Egmond Tower Engineering Professionals Gulf Equipment Corporation 326 Tryon Road 5540 Business Parkway Theodore, AL 36582 Raleigh, NC 27603 (601) 790-9730 (919) 661-6351 Structures@tepgroup.net Subject: Structural Analysis Report Carrier Designation: Duke Energy Cambium Pole Project Site Number: LA-SC-617 Site Name: Bad Creek Hydro Repeater Engineering Firm Designation: TEP Project Number: 332714.980317 Site Data: 100 Bad Creek Rd., Salem, Oconee County, SC 29676 Latitude 35° 01' 05.48'', Longitude -83° 00' 35.25'' 120 Foot (AGL) Valmont H10 Monopole - Direct Embed Dear Elizabeth Van Egmond, Tower Engineering Professionals is pleased to submit this “Structural Analysis Report” to determine the structural integrity of the above-mentioned tower. The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have determined the stress level for the tower and foundation structure, under the following load case, to be: LC1: Existing + Proposed + Reserved Loading Sufficient Capacity Note: See Table 1 for the existing, proposed, and reserved loading The analysis has been performed in accordance with the ANSI/TIA-222-H Structural Standard for Antenna Supporting Structures, Antennas, and Small Wind Turbine Support Structures and the 2021 International Building Code. All modifications and equipment proposed in this report shall be installed in accordance with the appurtenances listed in Table 1 for the determined available structural capacity to be effective. We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional services to you and Gulf Equipment Corporation. If you have any questions or need further assistance on this or any other projects please give us a call. Respectfully submitted by: Jordan W. Shelley, P.E. Structure Capacity Foundation Capacity 60.7% 63.3% 08/01/2024 66 July 29, 2024 120 ft Monopole Structural Analysis Bad Creek Hydro Repeater TEP Project Number 332714.980317 Page 2 TABLE OF CONTENTS 1) INTRODUCTION 2) ANALYSIS CRITERIA Table 1 - Existing, Proposed, and Reserved Antenna and Cable Information 3) ANALYSIS PROCEDURE Table 2 - Documents Provided 3.1) Analysis Method 3.2) Assumptions 4) ANALYSIS RESULTS Table 3 - Section Capacity (Summary) Table 4 - Tower Component Stresses vs. Capacity Table 5 - Dish Twist/Sway Results for 60 mph Service Wind Speed 4.1) Recommendations 5) APPENDIX A tnxTower Output 6) APPENDIX B Additional Calculations 67 July 29, 2024 120 ft Monopole Structural Analysis Bad Creek Hydro Repeater TEP Project Number 332714.980317 Page 3 1) INTRODUCTION The tower is a 140-foot monopole with 120-ft above grade elevation, embedded 20-feet below grade designed by Valmont in June of 2022. All information provided to TEP was assumed to be accurate and complete. 2) ANALYSIS CRITERIA TIA-222 Revision: ANSI/TIA-222-H Type of Analysis: Comprehensive Risk Category: II Wind Speed: 107 mph (Ultimate) Exposure Category: D Topographic Category: 5 (Kzt = 2.117) Ice Thickness: 1.50 in Wind Speed with Ice: 30 mph Seismic Design Category: C Seismic Ss: 0.392 Seismic S1: 0.104 Service Wind Speed: 60 mph Table 1 - Existing, Proposed, and Reserved Antenna and Cable Information Existing/ Proposed/ Reserved Mount Level (ft) Ant CL (ft) Qty Antenna Model Mount Type Qty Coax Coax Size Coax Location Owner/ Tenant Proposed 117.0 122.5 1 Sinclair SC329-HF2LDF-DO6-G06 (1) Site Pro 1 HS6-K 1 1-5/8 Inside Duke Energy Proposed 97.0 102.5 1 Sinclair SC329-HF2LDF-DO6-G06 (1) Site Pro 1 HS6-K 1 1-5/8 Inside Duke Energy 3) ANALYSIS PROCEDURE Table 2 - Documents Provided Document Remarks Source Tower Design Valmont, dated June 22, 2022 Dwg. No. 307137Z Duke Energy Geotechnical Report S&ME, dated July 24, 2024 Project No. 23600531 Duke Energy Construction Drawings SMW Engineering Group, LLC., dated May 17, 2024 Job No. 21-2705.1 Duke Energy Correspondence Correspondence in reference to the existing, proposed, and reserved loading. Gulf Equipment Corporation 3.1) Analysis Method tnxTower (version 8.2.4.3), a commercially available analysis software package, was used to create a three-dimensional model of the tower and calculate member stresses for various loading cases. Selected output from the analysis is included in Appendix A. 68 July 29, 2024 120 ft Monopole Structural Analysis Bad Creek Hydro Repeater TEP Project Number 332714.980317 Page 4 3.2) Analysis Assumptions 1) The tower and foundation were built and maintained in accordance with the manufacturer’s specification. 2) The configuration of existing antennas, transmission cables, mounts and other appurtenances are as specified in the tower mapping report by TEP. 3) Unless specified by the client or tower mapping, the location of the existing and proposed coax is assumed by TEP and listed in Table 1. 4) All tower components are in sufficient condition to carry their full design capacity. 5) Serviceability with respect to antenna twist, tilt, roll, or lateral translation, is not checked and is left to the carrier or tower owner to ensure conformance. 6) All antenna mounts and mounting hardware are structurally sufficient to carry the full design capacity requirements of appurtenance wind area and weight as provided by the original manufacturer specifications. It is the carrier’s responsibility to ensure compliance to the structural limitations of the existing and/or proposed antenna mounts. TEP did not analyze antennas supporting mounts as part of this structural analysis report. This analysis may be affected if any assumptions are not valid or have been made in error. Tower Engineering Professionals should be notified to determine the effect on the structural integrity of the tower. 4) ANALYSIS RESULTS Table 3 - Section Capacity (Summary) Section No. Elevation (ft) Component Type Size Critical Element P (lb) øPallow (lb) % Capacity Pass / Fail L1 120 - 67.0833 Pole TP26.08x16.51x0.219 1 -2881.790 1087548.000 24.9 Pass L2 67.0833 - 31.6667 Pole TP32.05x24.888x0.25 2 -6444.020 1529177.875 44.2 Pass L3 31.6667 - 0 Pole TP37.272x30.676x0.281 3 -11852.800 2055920.875 60.7 Pass Summary Pole (L3) 60.7 Pass RATING = 60.7 Pass Table 4 - Tower Component Stresses vs. Capacity Notes Component Elevation (ft) % Capacity Pass / Fail 1,2 Direct Embed Soil Interaction - 25.9 Pass 1,2 Direct Embed Structural - 63.3 Pass Structure Rating (max from all components) = 63.3% Notes: 1) Rating per TIA-222-H, Section 15.5 2) See additional documentation in “Appendix B - Additional Calculations” for calculations supporting the % capacity listed. Table 5 - Dish Twist/Sway Results for 60 mph Service Wind Speed Elevation (ft) Dish Model Beam Deflection Deflection (in) Tilt (deg) Twist (deg) - - - - - 69 July 29, 2024 120 ft Monopole Structural Analysis Bad Creek Hydro Repeater TEP Project Number 332714.980317 Page 5 4.1) Recommendations 1) If the load differs from that described in Table 1 of this report or the provisions of this analysis are found to be invalid, another structural analysis should be performed. 2) The tower and its foundation have sufficient capacity to carry the proposed load configuration. No modifications are required at this time. 3) Tower is to be directly embedded to a depth of 20-ft below grade 70 July 29, 2024 120 ft Monopole Structural Analysis Bad Creek Hydro Repeater TEP Project Number 332714.980317 Page 6 APPENDIX A TNX TOWER OUTPUT 71 Tower Engineering Professionals Tower Engineering Professionals 326 Tryon Road Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Job: BAD CREEK HYDRO REPEATER Project: TEP# 332714.980317 Client: Duke Energy Drawn by: RAD App'd: Code: TIA-222-H Date: 07/29/24 Scale: NTS Path: C:\00. Rahul\Rahul Non-Crown\SA sites\02. SST\Gulf Equipment Corp dba Gulf Services\01. 332714\P-403696_L-980317__Bad Creek Repeater_Structural Analysis\TNX\BAD CREEK HYDRO REPEATER.eri Dwg No. E-1 120.0 ft 67.1 ft 31.7 ft 0.0 ft REACTIONS - 107 mph WIND TORQUE 688 lb-ft 16936 lb SHEAR 965203 lb-ft MOMENT 11864 lb AXIAL 30 mph WIND - 1.500 in ICE TORQUE 183 lb-ft 2261 lb SHEAR 142613 lb-ft MOMENT 23060 lb AXIAL ARE FACTORED ALL REACTIONS Section 123 Length (ft) 52.91739.58336.500 Number of Sides 121212 Thickness (in) 0.2190.2500.281 Socket Length (ft) 4.1674.833 Top Dia (in) 16.51024.88830.676 Bot Dia (in) 26.08032.05037.272 Grade A572-65 Weight (lb) 2676.23059.83786.49522.4 5/8" x 10' LROD 120 Side Arm Mount [SO 302-1] 117 SC329-HF2LDF(D03-G06) 117 Side Arm Mount [SO 302-1] 97 SC329-HF2LDF(D03-G06) 97DESIGNED APPURTENANCE LOADING TYPE TYPEELEVATION ELEVATION 5/8" x 10' LROD 120 Side Arm Mount [SO 302-1] 117 SC329-HF2LDF(D03-G06) 117 Side Arm Mount [SO 302-1] 97 SC329-HF2LDF(D03-G06) 97 MATERIAL STRENGTH GRADE GRADEFy FyFu Fu A572-65 65 ksi 80 ksi TOWER DESIGN NOTES 1. Tower is located in Oconee County, South Carolina. 2. Tower designed for Exposure D to the TIA-222-H Standard. 3. Tower designed for a 107 mph basic wind in accordance with the TIA-222-H Standard. 4. Tower is also designed for a 30 mph basic wind with 1.50 in ice. Ice is considered to increase in thickness with height. 5. Deflections are based upon a 60 mph wind. 6. Tower Risk Category II. 7. Topographic Category 5 with Crest Height of 409.000 ft 8. TOWER RATING: 60.7% 72 ttnnxxTToowweerr Job BAD CREEK HYDRO REPEATER Page 1 of 8 Tower Engineering Professionals 326 Tryon Road Project TEP# 332714.980317 Date 12:14:10 07/29/24 Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Client Duke Energy Designed by RAD Tower Input Data The tower is a monopole. This tower is designed using the TIA-222-H standard. The following design criteria apply: Tower is located in Oconee County, South Carolina. Tower base elevation above sea level: 2457.630 ft. Basic wind speed of 107 mph. Risk Category II. Exposure Category D. Crest Height: 409.000 ft. Rigorous Topographic Factor Procedure for wind speed-up calculations is used. Topographic Feature: Hill. Slope Distance L: 1906.000 ft. Distance from Crest x: 0.000 ft. Horizontal Distance Downwind: No. Nominal ice thickness of 1.500 in. Ice thickness is considered to increase with height. Ice density of 56 pcf. A wind speed of 30 mph is used in combination with ice. Temperature drop of 50 °F. Deflections calculated using a wind speed of 60 mph. A non-linear (P-delta) analysis was used. Pressures are calculated at each section. Stress ratio used in pole design is 1.05. Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered. Options Consider Moments - Legs Assume Legs Pinned Calculate Redundant Bracing Forces Consider Moments - Horizontals √ Assume Rigid Index Plate Ignore Redundant Members in FEA Consider Moments - Diagonals √ Use Clear Spans For Wind Area SR Leg Bolts Resist Compression Use Moment Magnification Use Clear Spans For KL/r All Leg Panels Have Same Allowable Use Code Stress Ratios Retension Guys To Initial Tension Offset Girt At Foundation √ Use Code Safety Factors - Guys √ Bypass Mast Stability Checks √ Consider Feed Line Torque Escalate Ice √ Use Azimuth Dish Coefficients Include Angle Block Shear Check Always Use Max Kz √ Project Wind Area of Appurtenances Use TIA-222-H Bracing Resist. Exemption Use Special Wind Profile √ Alternative Appurt. EPA Calculation Use TIA-222-H Tension Splice Exemption Include Bolts In Member Capacity Autocalc Torque Arm Areas Poles Leg Bolts Are At Top Of Section Add IBC .6D+W Combination √ Include Shear-Torsion Interaction Secondary Horizontal Braces Leg √ Sort Capacity Reports By Component Always Use Sub-Critical Flow Use Diamond Inner Bracing (4 Sided) Triangulate Diamond Inner Bracing Use Top Mounted Sockets SR Members Have Cut Ends Treat Feed Line Bundles As Cylinder √ Pole Without Linear Attachments SR Members Are Concentric Ignore KL/ry For 60 Deg. Angle Legs Pole With Shroud Or No Appurtenances Distribute Leg Loads As Uniform Use ASCE 10 X-Brace Ly Rules Outside and Inside Corner Radii Are Known ttnnxxTToowweerr Job BAD CREEK HYDRO REPEATER Page 2 of 8 Tower Engineering Professionals 326 Tryon Road Project TEP# 332714.980317 Date 12:14:10 07/29/24 Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Client Duke Energy Designed by RAD Tapered Pole Section Geometry Section Elevation ft Section Length ft Splice Length ft Number of Sides Top Diameter in Bottom Diameter in Wall Thickness in Bend Radius in Pole Grade L1 120.000-67.083 52.917 4.167 12 16.510 26.080 0.219 0.876 A572-65 (65 ksi) L2 67.083-31.667 39.583 4.833 12 24.888 32.050 0.250 1.000 A572-65 (65 ksi) L3 31.667-0.000 36.500 12 30.676 37.272 0.281 1.124 A572-65 (65 ksi) Tapered Pole Properties Section Tip Dia. in Area in2 I in4 r in C in I/C in3 J in4 It/Q in2 w in w/t L1 17.015 11.488 389.161 5.832 8.552 45.504 788.545 5.654 3.838 17.524 26.923 18.237 1556.761 9.258 13.509 115.235 3154.419 8.976 6.403 29.235 L2 26.459 19.834 1536.817 8.821 12.892 119.205 3114.007 9.762 6.000 24 33.092 25.599 3304.176 11.384 16.602 199.024 6695.157 12.599 7.919 31.678 L3 32.563 27.502 3242.911 10.881 15.890 204.086 6571.016 13.535 7.468 26.576 38.488 33.470 5845.840 13.243 19.307 302.783 11845.257 16.473 9.236 32.868 Tower Elevation ft Gusset Area (per face) ft2 Gusset Thickness in Gusset Grade Adjust. Factor Af Adjust. Factor Ar Weight Mult. Double Angle Stitch Bolt Spacing Diagonals in Double Angle Stitch Bolt Spacing Horizontals in Double Angle Stitch Bolt Spacing Redundants in L1 120.000-67.08 3 1 1 1 L2 67.083-31.667 1 1 1 L3 31.667-0.000 1 1 1 Feed Line/Linear Appurtenances - Entered As Round Or Flat Description Sector Exclude From Torque Calculation Component Type Placement ft Total Number Number Per Row Start/End Position Width or Diameter in Perimeter in Weight plf Safety Line 3/8 C No Surface Ar (CaAa) 120.000 - 10.000 1 1 0.000 0.000 0.375 0.220 Step Pegs (5/8'' SR) 7-in. w/30'' step C No Surface Ar (CaAa) 120.000 - 10.000 1 1 0.000 0.000 0.350 0.487 * Feed Line/Linear Appurtenances - Entered As Area 73 ttnnxxTToowweerr Job BAD CREEK HYDRO REPEATER Page 3 of 8 Tower Engineering Professionals 326 Tryon Road Project TEP# 332714.980317 Date 12:14:10 07/29/24 Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Client Duke Energy Designed by RAD Description Face or Leg Allow Shield Exclude From Torque Calculation Component Type Placement ft Total Number C AAA ft2/ft Weight plf **** EC7-50A( 1 5/8'') C No No Inside Pole 117.000 - 5.000 1 No Ice 1/2'' Ice 1'' Ice 2'' Ice 0.000 0.000 0.000 0.000 0.760 0.760 0.760 0.760 *** EC7-50A( 1 5/8'') C No No Inside Pole 97.000 - 5.000 1 No Ice 1/2'' Ice 1'' Ice 2'' Ice 0.000 0.000 0.000 0.000 0.760 0.760 0.760 0.760 * Feed Line/Linear Appurtenances Section Areas Tower Section Tower Elevation ft Face A R ft2 AF ft2 CAAA In Face ft2 CAAA Out Face ft2 Weight lb L1 120.000-67.083 A B C 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.836 0.000 0.000 0.000 0.000 0.000 98.085 L2 67.083-31.667 A B C 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.568 0.000 0.000 0.000 0.000 0.000 78.873 L3 31.667-0.000 A B C 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.571 0.000 0.000 0.000 0.000 0.000 55.852 Feed Line/Linear Appurtenances Section Areas - With Ice Tower Section Tower Elevation ft Face or Leg Ice Thickness in AR ft2 AF ft2 CAAA In Face ft2 CAAA Out Face ft2 Weight lb L1 120.000-67.083 A B C 2.038 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 46.969 0.000 0.000 0.000 0.000 0.000 730.496 L2 67.083-31.667 A B C 1.980 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 31.436 0.000 0.000 0.000 0.000 0.000 502.139 L3 31.667-0.000 A B C 1.819 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 18.728 0.000 0.000 0.000 0.000 0.000 301.331 Feed Line Center of Pressure Section Elevation ft CPX in CPZ in CPX Ice in CPZ Ice in ttnnxxTToowweerr Job BAD CREEK HYDRO REPEATER Page 4 of 8 Tower Engineering Professionals 326 Tryon Road Project TEP# 332714.980317 Date 12:14:10 07/29/24 Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Client Duke Energy Designed by RAD Section Elevation ft CPX in CPZ in CPX Ice in CPZ Ice in L1 120.000-67.083 0.000 0.482 0.000 2.752 L2 67.083-31.667 0.000 0.485 0.000 3.042 L3 31.667-0.000 0.000 0.327 0.000 2.222 Note: For pole sections, center of pressure calculations do not consider feed line shielding. Shielding Factor Ka Tower Section Feed Line Record No. Description Feed Line Segment Elev. Ka No Ice Ka Ice L1 1 Safety Line 3/8 67.08 - 120.00 1.0000 1.0000 L1 2 Step Pegs (5/8" SR) 7-in. w/30" step 67.08 - 120.00 1.0000 1.0000 L2 1 Safety Line 3/8 31.67 - 67.08 1.0000 1.0000 L2 2 Step Pegs (5/8" SR) 7-in. w/30" step 31.67 - 67.08 1.0000 1.0000 L3 1 Safety Line 3/8 10.00 - 31.67 1.0000 1.0000 L3 2 Step Pegs (5/8" SR) 7-in. w/30" step 10.00 - 31.67 1.0000 1.0000 Discrete Tower Loads Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustment ° Placement ft C AAA Front ft 2 CAAA Side ft 2 Weight lb 5/8'' x 10' LROD C From Leg 0.000 0.000 5.000 0.000 120.000 No Ice 1/2'' Ice 1'' Ice 2'' Ice 0.625 1.639 2.669 4.779 0.625 1.639 2.669 4.779 4.000 10.939 24.204 70.319 **117** Side Arm Mount [SO 302-1] B From Leg 0.500 0.000 0.000 0.000 117.000 No Ice 1/2'' Ice 1'' Ice 2'' Ice 0.810 1.300 1.810 2.910 3.310 5.000 6.800 10.990 55.000 82.940 122.050 233.110 SC329-HF2LDF(D03-G06) B From Leg 1.500 0.000 5.500 0.000 117.000 No Ice 1/2'' Ice 1'' Ice 2'' Ice 2.308 3.487 4.683 6.960 2.308 3.487 4.683 6.960 8.900 26.755 52.017 125.372 ***97*** Side Arm Mount [SO 302-1] C From Leg 0.500 0.000 0.000 0.000 97.000 No Ice 1/2'' Ice 1'' Ice 2'' Ice 0.810 1.300 1.810 2.910 3.310 5.000 6.800 10.990 55.000 82.940 122.050 233.110 74 ttnnxxTToowweerr Job BAD CREEK HYDRO REPEATER Page 5 of 8 Tower Engineering Professionals 326 Tryon Road Project TEP# 332714.980317 Date 12:14:10 07/29/24 Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Client Duke Energy Designed by RAD Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustment ° Placement ft C AAA Front ft 2 CAAA Side ft 2 Weight lb SC329-HF2LDF(D03-G06) C From Leg 1.500 0.000 5.500 0.000 97.000 No Ice 1/2'' Ice 1'' Ice 2'' Ice 2.308 3.487 4.683 6.960 2.308 3.487 4.683 6.960 8.900 26.755 52.017 125.372 ** Load Combinations Comb. No. Description 1 Dead Only 2 1.2 Dead+1.0 Wind 0 deg - No Ice 3 0.9 Dead+1.0 Wind 0 deg - No Ice 4 1.2 Dead+1.0 Wind 30 deg - No Ice 5 0.9 Dead+1.0 Wind 30 deg - No Ice 6 1.2 Dead+1.0 Wind 60 deg - No Ice 7 0.9 Dead+1.0 Wind 60 deg - No Ice 8 1.2 Dead+1.0 Wind 90 deg - No Ice 9 0.9 Dead+1.0 Wind 90 deg - No Ice 10 1.2 Dead+1.0 Wind 120 deg - No Ice 11 0.9 Dead+1.0 Wind 120 deg - No Ice 12 1.2 Dead+1.0 Wind 150 deg - No Ice 13 0.9 Dead+1.0 Wind 150 deg - No Ice 14 1.2 Dead+1.0 Wind 180 deg - No Ice 15 0.9 Dead+1.0 Wind 180 deg - No Ice 16 1.2 Dead+1.0 Wind 210 deg - No Ice 17 0.9 Dead+1.0 Wind 210 deg - No Ice 18 1.2 Dead+1.0 Wind 240 deg - No Ice 19 0.9 Dead+1.0 Wind 240 deg - No Ice 20 1.2 Dead+1.0 Wind 270 deg - No Ice 21 0.9 Dead+1.0 Wind 270 deg - No Ice 22 1.2 Dead+1.0 Wind 300 deg - No Ice 23 0.9 Dead+1.0 Wind 300 deg - No Ice 24 1.2 Dead+1.0 Wind 330 deg - No Ice 25 0.9 Dead+1.0 Wind 330 deg - No Ice 26 1.2 Dead+1.0 Ice+1.0 Temp 27 1.2 Dead+1.0 Wind 0 deg+1.0 Ice+1.0 Temp 28 1.2 Dead+1.0 Wind 30 deg+1.0 Ice+1.0 Temp 29 1.2 Dead+1.0 Wind 60 deg+1.0 Ice+1.0 Temp 30 1.2 Dead+1.0 Wind 90 deg+1.0 Ice+1.0 Temp 31 1.2 Dead+1.0 Wind 120 deg+1.0 Ice+1.0 Temp 32 1.2 Dead+1.0 Wind 150 deg+1.0 Ice+1.0 Temp 33 1.2 Dead+1.0 Wind 180 deg+1.0 Ice+1.0 Temp 34 1.2 Dead+1.0 Wind 210 deg+1.0 Ice+1.0 Temp 35 1.2 Dead+1.0 Wind 240 deg+1.0 Ice+1.0 Temp 36 1.2 Dead+1.0 Wind 270 deg+1.0 Ice+1.0 Temp 37 1.2 Dead+1.0 Wind 300 deg+1.0 Ice+1.0 Temp 38 1.2 Dead+1.0 Wind 330 deg+1.0 Ice+1.0 Temp 39 Dead+Wind 0 deg - Service 40 Dead+Wind 30 deg - Service 41 Dead+Wind 60 deg - Service ttnnxxTToowweerr Job BAD CREEK HYDRO REPEATER Page 6 of 8 Tower Engineering Professionals 326 Tryon Road Project TEP# 332714.980317 Date 12:14:10 07/29/24 Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Client Duke Energy Designed by RAD Comb. No. Description 42 Dead+Wind 90 deg - Service 43 Dead+Wind 120 deg - Service 44 Dead+Wind 150 deg - Service 45 Dead+Wind 180 deg - Service 46 Dead+Wind 210 deg - Service 47 Dead+Wind 240 deg - Service 48 Dead+Wind 270 deg - Service 49 Dead+Wind 300 deg - Service 50 Dead+Wind 330 deg - Service Maximum Tower Deflections - Service Wind Section No. Elevation ft Horz. Deflection in Gov. Load Comb. Tilt ° Twist ° L1 120 - 67.0833 15.276 45 0.954 0.005 L2 71.25 - 31.6667 6.170 45 0.756 0.002 L3 36.5 - 0 1.748 45 0.422 0.001 Critical Deflections and Radius of Curvature - Service Wind Elevation ft Appurtenance Gov. Load Comb. Deflection in Tilt ° Twist ° Radius of Curvature ft 120.000 5/8'' x 10' LROD 45 15.276 0.954 0.005 76738 117.000 Side Arm Mount [SO 302-1] 45 14.679 0.947 0.004 76738 97.000 Side Arm Mount [SO 302-1] 45 10.759 0.888 0.003 16682 Maximum Tower Deflections - Design Wind Section No. Elevation ft Horz. Deflection in Gov. Load Comb. Tilt ° Twist ° L1 120 - 67.0833 54.377 14 3.396 0.017 L2 71.25 - 31.6667 21.971 14 2.692 0.006 L3 36.5 - 0 6.226 14 1.503 0.002 Critical Deflections and Radius of Curvature - Design Wind Elevation ft Appurtenance Gov. Load Comb. Deflection in Tilt ° Twist ° Radius of Curvature ft 120.000 5/8'' x 10' LROD 14 54.377 3.396 0.017 21728 117.000 Side Arm Mount [SO 302-1] 14 52.251 3.369 0.017 21728 97.000 Side Arm Mount [SO 302-1] 14 38.303 3.163 0.011 4721 75 ttnnxxTToowweerr Job BAD CREEK HYDRO REPEATER Page 7 of 8 Tower Engineering Professionals 326 Tryon Road Project TEP# 332714.980317 Date 12:14:10 07/29/24 Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Client Duke Energy Designed by RAD Compression Checks Pole Design Data Section No. Elevation ft Size L ft Lu ft Kl/r A in2 Pu lb φ Pn lb Ratio Pu φ Pn L1 120 - 67.0833 (1) TP26.08x16.51x0.219 52.917 0.000 0.0 17.705 -2881.790 1035760.000 0.003 L2 67.0833 - 31.6667 (2) TP32.05x24.888x0.25 39.583 0.000 0.0 24.895 -6444.020 1456360.000 0.004 L3 31.6667 - 0 (3) TP37.272x30.676x0.281 36.500 0.000 0.0 33.471 -11852.800 1958020.000 0.006 Pole Bending Design Data Section No. Elevation ft Size Mux lb-ft φ Mnx lb-ft Ratio Mux φ Mnx Muy lb-ft φ Mny lb-ft Ratio Muy φ Mny L1 120 - 67.0833 (1) TP26.08x16.51x0.219 152465.833 589428.333 0.259 0.000 589428.333 0.000 L2 67.0833 - 31.6667 (2) TP32.05x24.888x0.25 452186.667 984125.000 0.459 0.000 984125.000 0.000 L3 31.6667 - 0 (3) TP37.272x30.676x0.281 965200.000 1530700.000 0.631 0.000 1530700.000 0.000 Pole Shear Design Data Section No. Elevation ft Size Actual Vu lb φ Vn lb Ratio Vu φ Vn Actual Tu lb-ft φ Tn lb-ft Ratio Tu φ Tn L1 120 - 67.0833 (1) TP26.08x16.51x0.219 6165.890 304985.000 0.020 84.508 686250.000 0.000 L2 67.0833 - 31.6667 (2) TP32.05x24.888x0.25 11201.100 432565.000 0.026 84.455 1188525.000 0.000 L3 31.6667 - 0 (3) TP37.272x30.676x0.281 16944.400 582623.000 0.029 84.399 1911341.667 0.000 Pole Interaction Design Data Section No. Elevation ft Ratio Pu φ Pn Ratio Mux φ Mnx Ratio Muy φ Mny Ratio Vu φ Vn Ratio Tu φ Tn Comb. Stress Ratio Allow. Stress Ratio Criteria L1 120 - 67.0833 (1) 0.003 0.259 0.000 0.020 0.000 0.262 1.050 L2 67.0833 - 31.6667 (2) 0.004 0.459 0.000 0.026 0.000 0.465 1.050 ttnnxxTToowweerr Job BAD CREEK HYDRO REPEATER Page 8 of 8 Tower Engineering Professionals 326 Tryon Road Project TEP# 332714.980317 Date 12:14:10 07/29/24 Raleigh, NC 27603 Phone: (919) 661-6351 FAX: - Client Duke Energy Designed by RAD Section No. Elevation ft Ratio Pu φ Pn Ratio Mux φ Mnx Ratio Muy φ Mny Ratio Vu φ Vn Ratio Tu φ Tn Comb. Stress Ratio Allow. Stress Ratio Criteria L3 31.6667 - 0 (3) 0.006 0.631 0.000 0.029 0.000 0.637 1.050 Section Capacity Table Section No. Elevation ft Component Type Size Critical Element P lb øPallow lb % Capacity Pass Fail L1 120 - 67.0833 Pole TP26.08x16.51x0.219 1 -2881.790 1087548.00 0 24.9 Pass L2 67.0833 - 31.6667 Pole TP32.05x24.888x0.25 2 -6444.020 1529177.87 5 44.2 Pass L3 31.6667 - 0 Pole TP37.272x30.676x0.281 3 -11852.800 2055920.87 5 60.7 Pass Summary Pole (L3) 60.7 Pass RATING = 60.7 Pass Program Version 8.2.4.3 76 July 29, 2024 120 ft Monopole Structural Analysis Bad Creek Hydro Repeater TEP Project Number 332714.980317 Page 7 APPENDIX B ADDITIONAL CALCULATIONS 77 Report File: TIA-222 Revison: Tower Type: Check Pier Capacity only at location of Max Moment? No Location: Soil Lateral Check Compression Uplift Comp. Uplift 6.59 - 965.203 4.89 - 11.864 1051.76 - 16.936 25.9% - Soil Vertical Check Compression Uplift Go to Soil Calculations 544.86 - ksi 562.38 - 60 ksi 0.11 - 40 ksi 1107.24 - 11.97 - 1.0% - 20 ft Embedded Pole Interaction Compression Uplift 0 ft 5.40 - 1047.35 - 5683.25 - 3.257 ft 63.3% - 27 Reinforced Concrete Shear Compression Uplift - - 3 in - - 4 - - in - - in *Rating per TIA-222-H Section 15.5 N/A # of Layers 4 121 FALSE 1 0 3 3 130 150 0 0 0.000 0.000 0.00 0.00 FALSE 2 3 8.5 5.5 130 150 36 0.000 0.000 2.00 2.00 FALSE 3 8.5 16.5 8 165 150 5 2.321 2.321 4.00 4.00 FALSE 4 16.5 20 3.5 165 150 6 2.700 2.700 8.00 8.00 90 Cohesionless Cohesive Cohesive Soil Profile Groundwater Depth SPT Blow Count Ult. Gross Bearing Capacity (ksf) Ultimate Skin Friction Uplift Override (ksf) Ultimate Skin Friction Comp Override (ksf) Calculated Ultimate Skin Friction Uplift (ksf) Calculated Ultimate Skin Friction Comp (ksf) Angle of Friction (degrees) γconcrete (pcf) γsoil (pcf) Cohesion (ksf)Bottom (ft) Thickness (ft)Layer Soil TypeTop (ft) Cohesionless Rebar Quantity Structural Foundation Rating*Rebar Size 63.3% Rebar Cage Diameter Soil Interaction Rating* 25.9% Rebar 2, Fy Override (ksi) Rebar 3, Fy Override (ksi) Material Properties Skin Friction (kips) Concrete Strength, f'c: End Bearing (kips) Rebar Strength, Fy: Weight of Concrete (kips) Tie Yield Strength, Fyt: Total Capacity (kips) Axial (kips) Pier Design Data Rating* Depth Ext. Above Grade Critical Depth (ft from TOC) Critical Moment (kip-ft)Pier Section 1 From 0' below grade to 20' below grade Critical Moment Capacity Pier Diameter Rating* Rebar Quantity Rebar Size Critical Depth (ft from TOC) Clear Cover to Ties Critical Shear (kip) Critical Shear CapacityTie Size Rating*Tie Spacing Embedded Pole Foundation Site# : LA-SC-617 Site Name: BAD CREEK HYDRO REPEATER TEP #: 332714.980317 H Shear Force (kips) Rating* N/A Check Limitation N/A N/A N/A Design Options Input Effective Depths (else Actual): Apply TIA-222-H Section 15.5:Monopole Analysis Results Applied Loads Dv=0 (ft from TOC) Soil Safety FactorMoment (kip-ft) Max Moment (kip-ft)Axial Force (kips) Consider non-tapered moment capacity: Rebar & Pier Options Embedded Pole Inputs Belled Pier Inputs Version 6.1.2 78 Site # : LA-SC-617 Site Name: BAD CREEK HYDRO REPEATER TEP #: 332714.980317 Encased in Concrete: No Number of Sides: 12 Yield Strength (ksi): 65 Thickness (in): 0.281 Bend Radius (in): 0.4215 Taper Factor (in/ft): 0.1809 Depth from Grade (ft): 3.01 Diameter (in): 37.82 Axial Demand (kip): 12.14 Axial Capacity (kip): 2043.07 Rating*: 0.6% Depth from Grade (ft): 5.42 Diameter (in): 38.25 Flexural Demand (kip-ft): 1047.49 Flexural Capacity (kip-ft): 1588.82 Rating*: 62.8% Depth from Grade (ft): 5.40 Diameter (in): 38.25 Axial Demand (kip): 11.90 Axial Capacity (kip): 2052.69 Flexural Demand (kip-ft): 1047.35 Flexural Capacity (kip-ft): 1588.60 Version Rating*: 63.3% Structural Rating: 63.3% Version 6.1.2 Maximum Interaction Rating Maximum Flexural Rating Maximum Axial Rating SUPPLEMENTAL EMBEDDED POLE REPORT Embedded Pole Properties 79 80

Source: Oconee County website. First collected Nov 14, 2026.