Backup Material
Oconee County · Oconee County · meeting of Apr 28, 2025 · Other
Open the original document More from Oconee County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
BOARD MEMBERS
James Henderson, District I Jason Cox, District IV
Gwen Fowler, District II Bill Gilster, District III
John Eagar, At-Large Tim Mays, District V
Wayne McCall, At-Large
Meeting agenda
April 28, 2025 6:00 pm
1. Call to order
2. Approval of minutes: 3/24/25
3. Brief statement about rules and procedures
4. Variance application VA24-000024 Wyatt Fullbright of
Richland Creek is requesting a front setback variance of 22’
to allow for a new property line between the existing storage
building and the existing shop building. TMS 252-00-01-005,
with an address of 2036 Sandifer Blvd, Seneca SC 29678.
5. Variance application #VA25-000005 Leon Manley is
requesting a 14’ reduction front setback for a metal building.
TMS #086-00-02-149, with an address of 412 Whispering
Pines Ln., Salem SC 29676.
6. Special Exemption application SE25-000001 Ryan Woods of Tower Engineering Professionals
is requesting a new communications tower for Duke Energy. TMS #016-00-01-001, with an
address of 100 Bad Creek Rd., Salem SC 29676.
7. Adjourn
Oconee County
Board of Zoning
Appeals
Council Chambers
415 South Pine Street
Walhalla, S.C. 29691
www.oconeesc.com
YouTube: “YourOconee”
Staff contact
846-638-4218
planninginfo@oconeesc.com
1
Minutes
6:00 PM – March 24, 2025
Members in Attendance
John Eagar
Jim Henderson
Wayne McCall
Gwen Fowler
Jason Cox
William Gilster
Staff
Elise Dunaway
James Coley- via phone
ITEM 1 – Call to Order – Mr. Eagar called the meeting to order at 6:00 PM.
ITEM 2 – Motion to approve the minutes from Feb 24, 2025 – Mr. Gilster made a
motion to approve the minutes; seconded by Mr. Henderson. Mr. Eagar called for a
vote. The motion passed 6-0.
ITEM 3 – Brief statement about rules and procedures – Mr. Eagar outlined the
proceedings of the meeting going forward:
• Applicant will provide a presentation to state their request (5 minutes).
• Staff will be asked to make any comments regarding the request.
• The public is allowed to voice their approval or opposition to the proposed.
Please do not repeat opinions that have already been stated into the record (3-5
minutes).
• Applicant rebuttal
• Board members will discuss in detail.
• Voting
ITEM 4. Variance application #VA25-000002 Luke Williams of Woodlands
Engineering Company LLC is requesting 1. A reduction of the front setback from
25’ to 15’ at 4 locations 2. Relief from the horizontal curvature requirements in
road design between curves and intersections. TMS #267-00-04-014, an
unaddressed parcel with the closest address of 684 Carver Park One Drive
Seneca SC 29678
Applicant Comments:
2
Stated Name: Luke Williams
Mr. Williams outlined the requests, starting with the reduced setbacks, then the curves.
Mr. Williams described the unique conditions of the parcel. Mr. Williams discussed the
septic system requirements the applicant is working through with the state. The
topography of the site is an additional constraint.
Staff comments: Mr. Coley addressed setback requirements on the sides between the
units, and confirmed that they are meeting the requirements for the right-of-way, and all
subdivision application requirements not listed in this variance application.
Public comment: NA
Applicant rebuttal: NA
Board Questions/ Discussion:
Mr. Gilster asked about the additional retaining walls needed in the grading plan if the
variance was denied.
Mr. McCall does not believe the plan meets the subdivision requirements. Mr. McCall
added his concerns about firetrucks being able to access the development, and the
distance between the units. Mr.McCall addressed the engineered septic system and
questioned if the septic system would work for the site.
Mr. Eagar asked additional questions regarding the engineered septic system specific to
the pumps and topography
Consideration of VA25-000001:
1. There are extraordinary and exceptional conditions pertaining to the particular
piece of property:
a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr.
Henderson. No discussion
b. Vote
In-favor Opposed
3 3
Mr. Eagar noted that the criterion did not pass.
2. These conditions do not generally apply to other property in the vicinity:
a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr.
Henderson. No Discussion
b. Vote
3
In-favor Opposed
3 3
Mr. Eagar noted that the criterion did not pass.
3. Because of these conditions, the application of this chapter to the particular piece
of property would effectively prohibit or unreasonably restrict the utilization of the
property.
a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr.
Eagar. No discussion.
b. Vote
In-favor Opposed
2 3
Ms.Fowler did not vote
Mr. Eagar noted that the criterion did not pass.
4. The authorization of a variance will not be of substantial detriment to adjacent
uses or to the public good, and the character of the district will not be harmed by
the granting of the variance.
a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr.
Henderson. No Discussion
b. Vote
In-favor Opposed
2 4
Mr. Eagar noted that the criterion did not pass.
5. Mr. Coley asked – Based on the evidence presented to the Board, do I hear a
motion that the proposed variance be Denied.
a. Motion – Mr. McCall made a motion; seconded by Mr. Cox.
b. Discussion regarding conditions attached to the approval: NA
c. Vote
In-favor Opposed
5 1
Mr. Eagar noted that the variance request was Denied
Item 5- Variance application #VA25-000003 Houston Henry of DH Building and
Son’s Inc is requesting a 3’ reduction to the side setback and a 7’ reduction in the
rear setback for a metal garage building. TMS #291-00-04-047, with an address of
227 Snow Creek Road Seneca SC 29678
4
Motion to table item 5 by Mr. Gilster, second Mr. Cox motion passed 6-0
Item 6- Adjourn- Motion by Mr. Gilster approved 6-0
5
Freedom of Information Act - Variance Application
Permitting Information
Code
section
from which
a variance
is
requested
38-
10.2
Upload
Supporting
Documentation
Here
Application
is
Application is
not
APPLICANT RESPONSES TO SECTION 38-7.1
Describe the extraordinary and exceptional condition (such as
size, shape, and topography) that pertains to the subject property
that does not generally apply to other land or structures in the
vicinity.:
Flood zone in partial part of the property and creek run the length
of the property.
Are the circumstances affecting the subject property the result of
actions by the applicant/owner? Explain. Yes’m the flood plan affects the land and building
Describe the ways in which application of the requirement(s) of the
ordinance effectively prohibit or unreasonably restrict the utilization
of the subject property.:
Will the proposed variance result in an activity that will not be of
substantial detriment to adjacent uses or to the public good, and
the character of the district will not be harmed by the granting of
the variance. Explain.:
This variance will promote more business to the are and
surrounding businesses. This would have a positive impact on
surrounding property owners .
General Contractor Richland Creek
ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of the rules
legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an equally good or better
form of construction is proposed. The board shall have no authority to waive requirements of this code.
Comments
OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN THAT THE
PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS ASSOCIATION, OR SIMILAR
ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY SIGNING BELOW YOU ACKNOWLEDGE THAT
COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR RESPONSIBILITY.
Workflow Reviews Information
Type Creation Date Due Date Completion Date Status Description
Application
Check 11/25/2024 11/26/2024 12/10/2024 Approved
1/23/25, 3:42 PM Permit List | Citizenserve
https://www7.citizenserve.com/Admin/PermitController?Action=ListPermits&WorkOrder_ID=89014810&ciDisplay=null&getPrint=true&skipLoading=true 1/4
6
7
8
9
10
11
Freedom of Information Act - Variance Application
Permitting Information
Code section from which a
variance is requested
Upload Supporting
Documentation Here
Application is Application is not
restricted by any covenant
that conflicts with the
requested activity.
APPLICANT RESPONSES TO SECTION 38-7.1
Describe the extraordinary and exceptional condition (such
as size, shape, and topography) that pertains to the subject
property that does not generally apply to other land or
structures in the vicinity.:
I do not believe there is any condition that does not
generally apply to other land or structures in the vicinity.
Are the circumstances affecting the subject property the
result of actions by the applicant/owner? Explain.
Yes, I was unaware of the 50' encroachment from the road, I
thought it was 25' and at least one other home on
Whispering Pines Lane is within the 50' as well. I do take full
accountability for not checking beforehand and making this
mistake as the building is 36' from the road.
Describe the ways in which application of the requirement(s)
of the ordinance effectively prohibit or unreasonably restrict
the utilization of the subject property.:
I do not believe it restricts the utilization of the subject
property or any other property in the vicinity although it is
encroaching 14'. (36' from the road)
Will the proposed variance result in an activity that will not
be of substantial detriment to adjacent uses or to the public
good, and the character of the district will not be harmed by
the granting of the variance. Explain.:
No, I had the metal building installed to help me transition
into moving onto the property to help my 90 year old
grandmother more who lives alone right below the subject
property. I have spoke with neighbors on Whispering Pines
Lane and they fully support the metal building.
General Contractor
ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of
the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an
equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this
code.
Comments
OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN
THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS
ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY
SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR
RESPONSIBILITY.
Workflow Reviews Information
Type Creation Date Due Date Completion Date Status Description
Application
Check 03/14/2025 03/15/2025 03/14/2025 Approved
Planning
and Zoning
Review
03/14/2025 04/29/2025 01/01/1900 Pending
Review
Complete 03/14/2025 01/01/1900 01/01/1900 Pending
Inspection Information
Activities Information
4/24/25, 9:14 AM Permit List | Citizenserve
https://www3.citizenserve.com/Admin/PermitController?Action=ListPermits&WorkOrder_ID=89416711&ciDisplay=null&getPrint=true&skipLoading=true 1/4
12
13
14
15
Bad Creek Repeater – Duke Energy
Response to Section 38-7.2
February 17, 2025
Page 1 of 2
326 Tryon Road, Raleigh, NC 27603-3530 o) 919.661.6351 f) 919.661.6350
jgoins@tepgroup.net; www.tepgroup.net
Subject: Site Name: Bad Creek Repeater – Monopole
Proposed Duke Energy Monopole
100 Bad Creek Rd, Salem, SC 29676
Response to Oconee County Ordinance, Section 38-7.2 (Special Exceptions):
1. In accordance with the comprehensive plan and is consistent with the spirit, purposes, and the
intent and specific requirements of this chapter, to include the definition and intent of the
district in which the special exception is being requested.
The proposed monopole will be located at 100 Bad Creek Rd on par cel 016-00-01-001 in Oconee
County, SC. This site houses a number of power generation facilities managed by Duke Energy. The
site is adjacent to the Oconee Nuclear Station, also owned by Duke Energy, which provides vital
electricity output to Oconee County and surrounding areas.
The proposed monopole will provide plant radio support for the nearby substation. The Future Land
Use designations surrounding the location are industrial, which is consistent with the proposed
monopole and Duke Energy’s nearby power generation facilities. In terms of future need for electric
power, the Comprehensive Plan identifies increases in both housing stock and economic
development efforts targeting Advanced Manufacturing, Automotive, Metal Fabrication, and Plastics
Injection Molding. These increases will require continued reliability and connectivity from the
electric grid, which will be supported by the proposed monopole. Thus, the proposed monopole is
consistent with both the land use and economic objectives set forth in the Comprehensive Plan.
Additionally, the proposed monopole complies with requirements in Article IV Section 32 -134 –
General Requirements. There are no towers within 1,300’ of the proposed monopole location that
could be found in the FAA’s database. The only tower is Duke Energy’s outdated self-support on-
site which is outdated and being replaced by this monopole. The outdated self -support will be
removed once Duke’s plant radio systems have been switched over to the monopole. See “Duke
Energy Bad Creek Repeater – Statement of Need Letter” for further information.
2. In the best interests of the county, the convenience of the community and the public welfare.
The proposed tower will be an important part of Duke Energy’s power generation infrastructure.
Duke Energy’s existing tower is at the End of Life and needs to be replaced with a new tower which
is up to code and has the structural capacity for up -to-date communications equipment. While the
majority of Duke Energy’s outdated self-support’s functions have been switched over to their new
380’ self-support to the north on the property; that tower does not have coverage for Duke Energy’s
local plant radio system as a result of the topography surrounding its location. This monopole serves
to fill that gap. It is a public necessity and is critical for the continued connectivity of the Duke
Energy system. Thus, the proposed tower aids Duke Energy’s ability to maintain the proper
reliability metrics for their customers which enhance public safety and welfare.
16
Bad Creek Repeater – Duke Energy
Response to Section 38-7.2
February 17, 2025
Page 2 of 2
326 Tryon Road, Raleigh, NC 27603-3530 o) 919.661.6351 f) 919.661.6350
jgoins@tepgroup.net; www.tepgroup.net
3. Suitable for the property in question, and designed, constructed, operated, and maintained so
as to be in harmony with and appropriate in appearance to the existing or intended character
of the general vicinity.
The proposed tower is located on Duke Energy property. The property contains multiple utility uses
including substation and transmission line infrastructure. It is located to the east of the existing Duke
Energy Nuclear Substation Facility I. A visual impact analysis was conducted with photo simulation
renderings that show minimal visual impacts of the proposed monopole to the surrounding properties
and communities. The site is an ideal topography and location for communications with the nearby
Duke Energy plant. Thus, the proposed monopole keeps in harmony and appropriate appearance
with the existing character of the general vicinity.
4. Suitable in terms of effects on highway traffic, parking, and safety with adequate access
arrangements to protect streets from undue congestion and hazards.
The proposed monopole will use the current restricted access road into the site and is situated well
within the property so as not to interfere with highway traffic. The site will continue to be unmanned
and located within Duke’s vast parcel. Few vehicles will access the site or contribute to traffic
hazards or congestion. Additionally, the proposed monopole is setback much further than its tower
height. In the extremely unlikely event of failure. It would fall well within Duke Energy’s property
and would not pose any danger to adjacent properties or communities.
If you have any questions, feel free to contact me on my direct number: (919) 943-0397 or reach out at
the email address shown below.
Sincerely,
Ryan Woods
rjwoods@tepgroup.net
Tower Engineering Professionals (TEP)
17
326 Tryon Rd. Raleigh, NC 27603-3530 O) (919) 661-6351 F) (919) 661-6350
rmalek@tepgroup.net
November 19, 2024
Mr. Dale Brooks
Duke Energy
Subject: Bad Creek Repeater Tower Balloon Test
Dear Mr. Brooks,
On November 17
th and 18 th, 2024, TEP OpCo, LLC, on behalf of Duke Energy, completed a Balloon Test
pursuant to the Oconee County, SC Zoning Ordinance for a proposed 120-ft AGL (130-ft overall with
appurtenances/lightning rod) monopole communications tower to be located at 100 Bad Creek Road, north of
the town of Salem, within Oconee County, South Carolina at latitude: N 35° 1’ 5.48”, longitude: W 83° 0’ 35.25”
(NAD 83).
On Sunday, November 17
th, 2024, TEP deployed an approximately 5-ft diameter red balloon at 130-ft above
ground level (to top of balloon) from 8:00 a.m. to 5 p.m. EST and again on November 18th, 2024 from 8 a.m to
11 a.m. The weather at the time of the balloon fli ght was sunny and clear, with excellent visibility, and
approximately 60 to 70 degrees Fahrenheit with steady approximately 1 to 2 mph northerly wind. Photographs
were taken by Garrett Johnson of TEP with a Nikon D3200 digital camera from numerous nearby locations
including major roads and public gathering places.
The visual impact assessment indicated that the blimp was not visible along Bad Creek Road to the southeast of
the site. Additionally, the blimp was visible along one section of Bad Creek Road located south of the proposed
tower site. In the areas that the blimp was visible, only approximately 20% or less of the vertical profile was
visible above trees and structures. Therefore, the tower base and accessory buildings will not be visible from
public rights-of-way and screening would not be necessary.
TEP utilized two (2) photographs to create computer-gen erated photo simulations to depict how the proposed
communications facility will appear once constructed. One photo simulation is from along the access road that
leads to the tower site, west of Bad Creek Road. The second photo simulation is from Bad Creek Road
approximately 0.4-miles south of the proposed tower site. Due to the presence of mature vegetation surrounding
the proposed tower site and the presence of mature vegetation along the public rights-of-way and throughout the
majority of the 1/2-mile visual area of potential effect, it is the opinion of TEP that the proposed tower will have
no significant visual impact on the surrounding areas.
Attached are the computer-generated photo simulations from two (2) locations surrounding the proposed tower
site. Please don’t hesitate to contact me with any questions or concerns regarding this report.
Sincerely,
Ryan A. Malek
Director of Environmental Regulatory Compliance
Tower Engineering Professionals, Inc.
18
PROJECT LOCATION DIRECTIONS
1. THE FACILITY IS UNMANNED.
2. A TECHNICIAN WILL VISIT THE SITE APPROXIMATELY ONCE A MONTH FOR
ROUTINE INSPECTION AND MAINTENANCE.
3. THE PROJECT WILL NOT RESULT IN ANY SIGNIFICANT LAND DISTURBANCE
OR EFFECT OF STORM WATER DRAINAGE.
4. NO SANITARY SEWER, POTABLE WATER OR TRASH DISPOSAL IS REQUIRED.
5. HANDICAP ACCESS IS NOT REQUIRED.
6. THE PROJECT DEPICTED IN THESE PLANS QUALIFIES AS AN ELIGIBLE
FACILITIES REQUEST ENTITLED TO EXPEDITED REVIEW UNDER 47 U.S.C. §
1455(A) AS A MODIFICATION OF AN EXISTING WIRELESS TOWER THAT
INVOLVES THE COLLOCATION, REMOVAL, AND/OR REPLACEMENT OF
TRANSMISSION EQUIPMENT THAT IS NOT A SUBSTANTIAL CHANGE UNDER
CFR § 1.61000 (B)(7).
SITE ADDRESS:
100 BAD CREEK RD
SALEM, SC 29676
COUNTY: OCONEE
PARCEL OWNER: DUKE POWER CO
PARCEL ID: 016-00-01-001
GEOGRAPHIC COORDINATES:
LATITUDE: 35° 01' 05.483" N
LONGITUDE: 83° 00' 35.246" W
GROUND ELEVATION: 2456'
ZONING INFORMATION:
JURISDICTION: OCONEE COUNTY
ZONING CLASS: N/A
PROJECT TEAM
APPLICANT:
THE PROPOSED PROJECT CONSISTS OF:
·NEW 120' MONOPOLE
·NEW DUKE ENERGY ICE BRIDGE
·NEW DUKE ENERGY ANTENNAS & ASSOCIATED EQUIPMENT
ON MONOPOLE
DIRECTIONS FROM 9700 DAVID TAYLOR DR, CHARLOTTE, NC 28262:
·GET ON I-85 S FROM DAVID TAYLOR DR AND RESEARCH DR
·CONTINUE STRAIGHT TO STAY ON I-85 S
·TAKE EXIT 70 TO MERGE ONTO I-26 W TOWARD ASHEVILLE
·TAKE EXIT 5 FOR CAROLINA 11 TOWARD CHESNEE/CAMPOBELLO
·TURN LEFT ONTO SC-11 S
·TURN RIGHT ONTO US-276 W
·CONTINUE STRAIGHT ONTO SC-11 S
·TURN RIGHT ONTO SC-130 N
·TURN RIGHT ONTO BAD CREEK RD
·SITE WILL BE ON THE RIGHT
COMPLIANCE CODE
PROJECT DESCRIPTION
POWER COMPANY: DUKE POWER
TELEPHONE COMPANY: TBD
UTILITY COMPANIES
PROJECT SUMMARY
SHEET INDEX
DUKE ENERGY ID NUMBER
LA-SC-617
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
CONSTRUCTION:
SHEET NO:DESCRIPTION:
T-1TITLE SHEET & PROJECT INFORMATION
T-1.1GENERAL NOTES
T-1.2GENERAL NOTES
--SURVEY
C-1ENLARGED SITE PLAN
C-2TOWER ELEVATION
C-2.1TOWER DESIGN
C-2.2TOWER DESIGN
C-3CONSTRUCTION DETAILS
S-1TOWER DETAILS
E-1OVERALL UTILITY PLAN
G-1GROUNDING SITE PLAN
G-2 TO G-2.0.2GROUNDING DETAILS & NOTES
GULF EQUIPMENT CORP.
dba GULF SERVICES
5540 BUSINESS PARKWAY
THEODORE,AL 36582-1616
CONTACT: CUSTOMER SERVICE
PHONE: 251-653-5075
VICINITY MAP
PROJECT NOTES
ENGINEER:
SMW ENGINEERING
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
CONTACT: JEREMY SHARIT, PE
PHONE: 205-397-6781
TITLE SHEET & PROJECT
INFORMATION
DUKE ENERGY CAROLINAS LLC
9700 DAVID TAYLOR BLVD
CHARLOTTE, NC 28262
T-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
TOWER OWNER:
DUKE ENERGY
ALL WORK SHALL BE PERFORMED AND MATERIALS INSTALLED
IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE
FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNMENT
AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUED
TO PERMIT WORK NOT CONFORMING TO THESE CODES.
1. 2021 SOUTH CAROLINA BUILDING CODE OR THE 2021
INTERNATIONAL BUILDING CODE WITH SC MODIFICATIONS
2. 2021 SOUTH CAROLINA RESIDENTIAL CODE OR THE 2021
INTERNATIONAL RESIDENTIAL CODE WITH SC
MODIFICATIONS
3. 2021 SOUTH CAROLINA FIRE CODE OR THE 2021
INTERNATIONAL FIRE CODE WITH SC MODIFICATIONS
4. 2021 SOUTH CAROLINA PLUMBING CODE OR THE 2021
INTERNATIONAL PLUMBING CODE
5. 2021 SOUTH CAROLINA MECHANICAL CODE OR THE 2021
INTERNATIONAL MECHANICAL CODE WITH SC
MODIFICATIONS
6. 2021 SOUTH CAROLINA FUEL GAS CODE OR THE 2021
INTERNATIONAL FUEL GAS CODE WITH SC MODIFICATIONS
7. 2009 SOUTH CAROLINA ENERGY CONSERVATION CODE
8. 2020 NATIONAL ELECTRICAL CODE (NFPA 70) WITH SC
MODIFICATIONS
19
T-1.1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GENERAL NOTES
GENERAL NOTES:
1. ALL REFERENCES TO OWNER HEREIN SHALL BE CONSTRUED TO MEAN DUKE ENERGY
OR ITS DESIGNATED REPRESENTATIVE.
2. ALL WORK PRESENTED ON THESE DRAWINGS MUST BE COMPLETED BY THE
CONTRACTOR UNLESS NOTED OTHERWISE. THE CONTRACTOR MUST HAVE
CONSIDERABLE EXPERIENCE IN PERFORMANCE OF WORK SIMILAR TO THAT DESCRIBED
HEREIN. BY ACCEPTANCE OF THIS ASSIGNMENT, THE CONTRACTOR IS ATTESTING
THAT HE DOES HAVE SUFFICIENT EXPERIENCE AND ABILITY, THAT HE IS
KNOWLEDGEABLE OF THE WORK TO BE PERFORMED AND THAT HE IS PROPERLY
LICENSED AND PROPERLY REGISTERED TO DO THIS WORK IN THE STATE AND/OR
COUNTY IN WHICH IT IS TO BE PERFORMED.
3. UNLESS SHOWN OR NOTED OTHERWISE ON THE CONTRACT DRAWINGS, OR IN THE
SPECIFICATIONS, THE FOLLOWING NOTES SHALL APPLY TO THE MATERIALS LISTED
HEREIN, AND TO THE PROCEDURES TO BE USED ON THIS PROJECT.
4. ALL HARDWARE ASSEMBLY MANUFACTURER'S INSTRUCTIONS SHALL BE FOLLOWED
EXACTLY AND SHALL SUPERCEDE ANY CONFLICTING NOTES ENCLOSED HEREIN.
5. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE
AND SEQUENCE TO INSURE THE SAFETY OF THE STRUCTURE AND ITS COMPONENT
PARTS DURING ERECTION AND/OR FIELD MODIFICATIONS. THIS INCLUDES, BUT IS NOT
LIMITED TO, THE ADDITION OF WHATEVER TEMPORARY BRACING, GUYS OR TIE DOWNS
THAT MAY BE NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN
THE PROPERTY OF THE CONTRACTOR AFTER THE COMPLETION OF THE PROJECT.
6. ALL DIMENSIONS, ELEVATIONS, AND EXISTING CONDITIONS SHOWN ON THE DRAWINGS
SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND THE TESTING AGENCY PRIOR TO
BEGINNING ANY MATERIALS ORDERING, FABRICATION OR CONSTRUCTION WORK ON
THIS PROJECT. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE OWNER AND THE OWNER'S ENGINEER. THE DISCREPANCIES MUST
BE RESOLVED BEFORE THE CONTRACTOR IS TO PROCEED WITH THE WORK. THE
CONTRACT DOCUMENTS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE
CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY
RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
AND PROCEDURES. OBSERVATION VISITS TO THE SITE BY THE OWNER AND/OR THE
ENGINEER SHALL NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR THE
CONSTRUCTION PROCEDURES.
7. ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW AND OF GOOD QUALITY,
FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE CONTRACT
DOCUMENTS. ANY AND ALL SUBSTITUTIONS MUST BE PROPERLY APPROVED AND
AUTHORIZED IN WRITING BY THE OWNER AND ENGINEER PRIOR TO INSTALLATION. THE
CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY
OF THE MATERIALS AND EQUIPMENT BEING SUBSTITUTED.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND
SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK. THE CONTRACTOR IS RESPONSIBLE FOR INSURING THAT THIS PROJECT AND
RELATED WORK COMPLIES WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL SAFETY
CODES AND REGULATIONS GOVERNING THIS WORK.
9. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE LATEST EDITION OF THE
LOCAL BUILDING CODE.
10. ACCESS TO THE PROPOSED WORK SITE MAY BE RESTRICTED. THE CONTRACTOR SHALL
COORDINATE INTENDED CONSTRUCTION ACTIVITY, INCLUDING WORK SCHEDULE AND
MATERIALS ACCESS, WITH THE OWNER FOR APPROVAL.
11. PREFABRICATED BUILDING INSTALLATION SHALL BE IN ACCORDANCE WITH THE
MANUFACTURER'S SPECIFICATIONS.
STRUCTURAL STEEL NOTES:
1. STRUCTURAL STEEL SHALL CONFORM TO THE LATEST EDITION OF THE A.I.S.C.
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS- ALLOWABLE STRESS DESIGN
AND PLASTIC DESIGN INCLUDING THE COMMENTARY AND THE A.I.S.C. CODE OF
STANDARD PRACTICE.
2. STRUCTURAL STEEL PLATES AND SHAPES SHALL CONFORM TO ASTM A26. ALL
STRUCTURAL STEEL PIPES SHALL CONFORM TO ASTM A53 GRADE B. ALL STRUCTURAL
STEEL TUBING SHALL CONFORM TO ASTM A500 GRADE B. ALL STRUCTURAL STEEL
COMPONENTS AND FABRICATED ASSEMBLIES SHALL BE HOT DIP GALVANIZED AFTER
FABRICATION.
3. WELDING SHALL BE IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY (AWS)
D.1.1/D1.1M:2010. STRUCTURAL WELDING CODE-STEEL WELD ELECTRODES SHALL BE
E70XX.
4. ALL COAXIAL CABLE CONNECTORS AND TRANSMITTER EQUIPMENT SHALL BE AS
SPECIFIED BY THE OWNER. THE CONTRACTOR SHALL FURNISH ALL CONNECTION
HARDWARE REQUIRED TO SECURE THE CABLES. CONNECTION HARDWARE SHALL BE
STAINLESS STEEL.
5. ALL REINFORCING STEEL SHALL CONFORM TO ASTM 615 GRADE 60, DEFORMED BILLET
STEEL BARS. WELDED WIRE FABRIC REINFORCING SHALL CONFORM TO ASTM A185.
6. THE FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE
LATEST A.I.S.C. SPECIFICATIONS.
7. ALL CONNECTIONS NOT FULLY DETAILED ON THESE PLANS SHALL BE DETAILED BY THE
STEEL FABRICATOR IN ACCORDANCE WITH A.I.S.C. SPECIFICATIONS.
8. HOT-DIP GALVANIZE ITEMS SPECIFIED TO BE ZINC-COATED, AFTER FABRICATION
WHERE PRACTICAL. GALVANIZING: ASTM A 123, ASTM, A 153/A 153M OR ASTM A 653/A
653M, G90, AS APPLICABLE.
9. REPAIR DAMAGED SURFACES WITH GALVANIZING REPAIR METHOD AND PAINT
CONFORMING TO ASTM A 780 OR BY APPLICATION OF STICK OR THICK PASTE MATERIAL
SPECIFICALLY DESIGNED FOR REPAIR OF GALVANIZING. CLEAN AREAS TO BE
REPAIRED, AND REMOVE SLAG FROM WELDS. HEAT SURFACES TO WHICH STICK OR
PASTE MATERIAL IS APPLIED WITH A TORCH TO A TEMPERATURE SUFFICIENT TO MELT
THE METALLICS. IN STICK OR PASTE, SPREAD MOLTEN MATERIAL UNIFORMLY OVER
SURFACES TO BE COATED AND WIPE OFF EXCESS MATERIAL.
10. CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S INSTRUCTIONS/SPECIFICATIONS
IF NO INFORMATION IS CONTAINED IN THESE PLANS OR IF THE MANUFACTURER'S
SPECIFICATIONS ARE STRICTER.
NOTE: REFER TO DUKE ENERGY SPECIFICATIONS AS THE CONTROLLING STANDARD
FOR PROPOSED CONSTRUCTION.
PERMITS:
1. CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS FOR THIS PROJECT FROM ALL
APPLICABLE GOVERNMENTAL AGENCIES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ABIDING BY ALL CONDITIONS AND
REQUIREMENTS OF THE PERMITS.
3. ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES AND THE ACI 318-08,
"BUILDING REQUIREMENTS FOR STRUCTURAL CONCRETE".
4. THE CONTRACTOR SHALL NOTIFY THE APPLICABLE JURISDICTIONAL (STATE, COUNTY
OR CITY) ENGINEER 24 HOURS PRIOR TO THE BEGINNING OF CONSTRUCTION.
5. ALL DIMENSIONS SHALL BE VERIFIED WITH THE PLANS (LATEST REVISION) PRIOR TO
COMMENCING CONSTRUCTION. NOTIFY THE OWNER IMMEDIATELY IF DISCREPANCIES
ARE DISCOVERED. THE CONTRACTOR SHALL HAVE A SET OF APPROVED PLANS
AVAILABLE AT THE SITE AT ALL TIMES WHEN WORK IS BEING PERFORMED. A
DESIGNATED RESPONSIBLE EMPLOYEE SHALL BE AVAILABLE FOR CONTACT BY
GOVERNING AGENCY INSPECTORS.
MISCELLANEOUS:
1. ALL THREADED STRUCTURAL FASTENERS FOR ANTENNA SUPPORT ASSEMBLES SHALL
CONFORM TO ASTM A307 OR ASTM 36. ALL STRUCTURAL FASTNERS FOR STRUCTURAL
STEEL FRAMING SHALL CONFORM TO ASTM A325. FASTENERS SHALL BE 5/8" MIN. DIA.
BEARING TYPE CONNECTIONS WITH THREADS EXCLUDED FROM THE PLANE. ALL
EXPOSED FASTENERS, NUTS, AND WASHERS SHALL BE GALVANIZED UNLESS
OTHERWISE NOTED. ALL ANCHORS INTO CONCRETE SHALL BE STAINLESS STEEL.
2. THE CONTRACTOR SHALL FURNISH ALL CONNECTION HARDWARE REQUIRED TO
SECURE THE CABLES. CONNECTION HARDWARE SHALL BE STAINLESS STEEL.
3. NORTH ARROW SHOWN ON PLANS REFERS TO TRUE NORTH. CONTRACTOR SHALL
VERIFY NORTH AND NOTIFY CONSULTANT OF ANY DISCREPANCY BEFORE STARTING
CONSTRUCTION.
4. PROVIDE LOCK WASHERS FOR ALL MECHANICAL CONNECTIONS FOR GROUND
CONDUCTORS. USE STAINLESS STEEL HARDWARE THROUGHOUT.
5. THOROUGHLY REMOVE ALL PAINT AND CLEAN ALL DIRT FROM SURFACES REQUIRING
GROUND CONNECTIONS.
6. MAKE ALL GROUND CONNECTIONS AS SHORT AND DIRECT AS POSSIBLE. AVOID SHARP
BENDS. ALL BENDS TO BE A MIN. OF 8" RADIUS.
7. FOR ALL EXTERNAL GROUND CONNECTIONS, CLAMPS AND CADWELDS, APPLY A
LIBERAL PROTECTIVE COATING OR AN ANTI-OXIDE COMPOUND SUCH AS 'NO-OXIDE A'
BY DEARBORN CHEMICAL COMPANY.
8. REPAIR ALL METAL SURFACES THAT HAVE BEEN CUT OR DAMAGED BY REMOVING ANY
EXISTING RUST AND APPLYING COLD GALVANIZATION.
9. ANTENNA CABLE LENGTHS HAVE BEEN DETERMINED BASED ON THESE PLANS. CABLE
LENGTHS LISTED ARE APPROXIMATED AND ARE NOT INTENDED TO BE USED FOR
FABRICATION. DUE TO FIELD CONDITIONS, ACTUAL CABLE LENGTHS VARY.
CONTRACTOR MUST FIELD VERIFY ANTENNA CABLE LENGTHS PRIOR TO ORDER.
20
T-1.2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GENERAL NOTES
FENCE
M
X
G
CONTOUR LINE
PROPERTY LINE/ROW
LEASE AREA
EASEMENT
DISCONNECT SWITCH
METER
CIRCUIT BREAKER
CODED NOTE NUMBER
CHEMICAL GROUND ROD
GROUND ROD
GROUND ROD W/ INSPECTION
SLEEVE
CADWELD TYPE CONNECTION
COMPRESSION TYPE CONNECTION
GROUND WIRE
xxxxxxxxxx
SYMBOL LEGEND:ABBREVIATIONS :
A.B. ANCHOR BOLT
AGL ABOVE GROUND LEVEL
AMSL ABOVE MEAN SEA LEVEL
APPROX APPROXIMATE
ASR ANTENNA STRUCTURE REGISTRATION
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAUGE
BCW BARE COPPER WIRE
BTCW BARE TINNED COPPER WIRE
CGB COAX GROUND BAR (SHELTER)
CGBE COAX GROUND BAR EXTERIOR
CLR CLEAR
COMM COMMUNICATIONS
COND CONDUIT
CU COPPER
DET DETAIL
DIA DIAMETER
DV DIVERSITY
DWG DRAWING
EGB EXTERIOR GROUND BAR
EL= ELEVATION EQUALS (AMSL, UNLESS OTHERWISE NOTED)
EQUIP EQUIPMENT
EW EACH WAY
EXP EXPANSION
FDN FOUNDATION
FFE FINISHED FLOOR ELEVATION
FLEX FLEXIBLE
FOC FIBER OPTIC CABLE
GA GAUGE
GALV GALVANIZED
GEN GENERATOR
GCFI GROUND FAULT CIRCUIT INTERRUPTER
HDPE HIGH DENSITY POLYETHYLENE
HVAC HEATING, VENTILATION, & AIR CONDITIONING
I.D. INTERIOR DIAMETER
IGB INTERMEDIATE GROUND BAR
IGR INTERIOR GROUND RING (SHELTER)
kVA KILOVOLT AMPERES
LMR LAND MOBILE RADIO
LPG LIQUID PETROLEUM GAS
MAS MULTIPLE ADDRESS (RADIO) SYSTEM
MAX MAXIMUM
MGB MASTER GROUND BAR
MIN MINIMUM
MISC MISCELLANEOUS
MTS MANUAL TRANSFER SWITCH
MW MICROWAVE
MW-DV MICROWAVE DIVERSITY
PLCS PLACES
PSI POUNDS per SQUARE INCH
PVC POLYVINYL CHLORIDE (CONDUIT)
REQ'D REQUIRED
RGS RIGID GALVANIZED STEEL (CONDUIT)
SCHED SCHEDULE
SCHEM SCHEMATIC
SYS SYSTEM
T&B TOP & BOTTOM
TBD TO BE DETERMINED
TELCO TELEPHONE COMPANY
TGB TOWER GROUND BAR
T.O.C. TOP OF CONCRETE
T.O.S. TOP/TOE OF SLOPE
TYP TYPICAL
XFMR TRANSFORMER
21
22
23
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP UGP
UGP
UGP
UGP
UGP
UGP
G
C-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
ENLARGED SITE PLAN
10'010' 5'
SCALE: 1"=5' (22X34)
1"=10' (11X17)
EXISTING TREES TO BE REMOVED
WITHIN COMPOUND AND EASEMENT.
CONTRACTOR TO FIELD VERIFY BEFORE
CONSTRUCTION
EXISTING GENERATOR
ON CONCRETE PAD
EXISTING
LP TANK
EXISTING
UNDERGROUND
POWER (TYP)
EXISTING EDGE
OF GRAVEL
EXISTING
TREELINE
EXISTING
ICE BRIDGE
PROPOSED 120'
MONOPOLE
PROPOSED ±19'
ICE BRIDGE (TYP)
EXISTING SELF
SUPPORT TOWER
EXISTING 18' WIDE
ASPHALT DRIVE
EXISTING OVERHEAD
POWER LINE (TYP)
EXISTING DUKE ENERGY
EQUIPMENT SHELTER
CONTRACTOR TO CUT OPENING
AND INSTALL COAX HATCH PLATE
ON SIDE OF EXISTING SHELTER
24
C-2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
PROPOSED
MONOPOLE
PROPOSED 10'
LIGHTNING ROD
TOWER ELEVATION
16'016' 8'
SCALE: 1"=8' (22X34)
1"=16' (11X17)
TOP OF PROPOSED TOWER
ELEV.: 120'-0" AGL
TOTAL TOWER HEIGHT
INCLUDING APPURTENANCES
ELEV.: 130'-0" AGL
PROPOSED DUKE ANTENNA MOUNT
ELEV.: 117'-0" AGL
PROPOSED DUKE ANTENNA
ELEV.: 122'-6" AGL
PROPOSED DUKE ANTENNA
ELEV.: 102'-6" AGL
PROPOSED DUKE ANTENNA MOUNT
ELEV.: 97'-0" AGL
25
C-2.1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
TOWER DESIGN
26
C-2.2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
TOWER DESIGN
27
C-3
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
CONSTRUCTION DETAILS
2'-0"
7'-0" CLEAR4'-0"
4"
(MAX.)
12"
3000 PSI CONCRETE
CRUSHED STONE ON
OTHER SURFACE
1/2" CROWN TOP
3 1/2"GALVANIZED PIPE. 8'-0" MAXIMUM
SPACING. PLACE EACH ON ALTERNATE
SIDE OF BRIDGE.
NEW DC AND FIBER
CABLES CLAMPED TO
UNISTRUT
2"X2" HD. G. UNISTRUT @ 3'-0"
O.C. MAX.
2"X2" HD. G. UNISTRUT @ 3'-0" O.C. MAX.
WAVEGUIDE BRIDGE
SUPPORT BRACKET
NEW GPS ANTENNA
2ICE BRIDGE CABLE DETAIL
SCALE: NOT TO SCALE
ICE BRIDGE NOTE:
·PRIOR TO CONSTRUCTION FIELD
COORDINATE HEIGHT AND ROUTE OF ICE
BRIDGE WITH TOWER OWNER
·ALL SUPPORT POSTS MUST BE GROUNDED
1GPS ANTENNA MOUNTING DETAIL
SCALE: NOT TO SCALE
GPS
1.32" O.D. x 14" MAX.
MOUNTING PIPE
1/2"Ø BOLT (TYP.)
GPS MOUNT ON
SWIC WALL
CABLES (PROVIDED
W/ ANTENNA)
ESTABLISH CONNECTION
AND PROVIDE
WEATHERPROOF KIT
NOTES:
1. LOCATION OF GPS MUST HAVE CLEAR
VIEW OF SOUTHERN SKY AND CANNOT
HAVE ANY BLOCKAGES EXCEEDING
25% OF THE SURFACE AREA OF A
HEMISPHERE AROUND THE GPS.
2. ALL GPS LOCATIONS MUST BE ABLE TO
RECEIVE CLEAR SIGNALS FROM A
MINIMUM OF FOUR (4) SATELLITES.
VERIFY WITH HANDHELD GPS BEFORE
FINAL LOCATION OF GPS.
28
S-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
TOWER DETAILS
TOWER ELEVATION
DETAIL 1
GENERAL CONSTRUCTION NOTES:
INSTALLATION NOTES:
29
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
T
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UNDERGROUND POWER
(RED PAINT, MARKED
BY OTHERS)
POWER BOX ON
CONCRETE PAD
T
T
UNDERGROUND COMMUNICATION
(ORANGE PAINT, MARKED BY OTHERS)
UGP
UNDERGROUND POWER
(RED PAINT, MARKED
BY OTHERS)
UNDERGROUND GAS
(YELLOW PAINT, MARKED
BY OTHERS)
UTILITY/METER RACK
18' WIDE
ASPHALT DRIVE
E-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
OVERALL UTILITY PLAN
50'050' 25'
SCALE: 1"=25' (11X17)
1"=50' (22X34)
PROPOSED 120'
MONOPOLE
PROPOSED ±19'
ICE BRIDGE (TYP)
EXISTING POWER
POLE (TYP)
EXISTING TELCO
PEDESTAL (TYP)
EXISTING SELF
SUPPORT TOWER
EXISTING LP TANK
EXISTING TREELINE
EXISTING OVERHEAD
POWER LINE (TYP)
EXISTING DUKE ENERGY
EQUIPMENT SHELTER
2-2" PVC FROM SERVICE POLE TO
HANDHOLE PLACED WITHIN 5' OF
SERVICE POLE
. 1-4" PVC FROM HANDHOLE TO
12"x12"x6" JUNCTION BOX AT SHELTER
WITH TRACER WIRE AND PULL STRING
12"x12"x6" PVC JUNCTION
BOX AT BUILDING. WITH 1-4"
PENETRATION TO SHELTER
2-2" PVC FROM SERVICE POLE TO HANDHOLE
PLACED WITHIN 5' OF SERVICE POLE
. 1-4" PVC FROM HANDHOLE TO 12"x12"x6"
JUNCTION BOX AT SHELTER WITH TRACER
WIRE AND PULL STRING
30
G-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GROUNDING SITE PLAN
1
2
4
10'010' 5'
SCALE: 1"=5' (22X34)
1"=10' (11X17)
EXISTING GENERATOR
ON CONCRETE PAD
EXISTING
LP TANK
EXISTING EDGE
OF GRAVEL
EXISTING
TREELINE
EXISTING
ICE BRIDGE
PROPOSED 120'
MONOPOLE
PROPOSED ±19'
ICE BRIDGE (TYP)
EXISTING SELF
SUPPORT TOWER
EXISTING DUKE ENERGY
EQUIPMENT SHELTER
3
6
1GROUNDING SITE PLAN
SCALE: AS NOTED
10
5
9
31
G-2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GROUNDING DETAILS & NOTES
SCALE: N.T.S.1
CADWELD GROUNDING CONNECTION DETAILS
SCALE: N.T.S.2
ANTENNA & CABLE GROUNDING
SCALE: N.T.S.5
GROUNDING STRAP WEATHERPROOFING DETAIL
SCALE: N.T.S.6
TYPICAL GROUND BAR CONNECTION DETAIL
SCALE: N.T.S.4
GENERAL LUG DETAIL
SCALE: N.T.S.3
GROUNDING ROD DETAIL
32
G-2.0.1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GROUNDING DETAILS & NOTES
NOTCH SIDES OF 8" PVC SCH 40
PIPE TO ALLOW EXIT/ENTRANCE OF
GROUND RINGGROUND RING
5/8"x10' GROUND ROD
TRENCH BOTTOM
FINISHED GRADE
GALV. STEEL
Ø .469x.719 TYP
(41) PL
Ø .469x.719 TYP
(41) PL
1
BOLT TO ANGLE IRON
(OR TOWER LEG)
HARDWARE
2
GROUNDING CONDUCTORS
CONTINUED TO GROUND LOOP
SEE PLAN
TOP OF CRUSHED STONE
ANTENNA CABLES
TOWER
MOUNTING PLATE FOR
GROUND BAR (TO SUIT)
STAND-OFF INSULATORS
(2)-#2/0-19 STRANDED TINNED COPPER GROUND
WIRE IN PVC SCH. 40 CONDUIT (TYP). EXTEND
CONDUIT 6" BELOW GRADE. GROUND WIRE TO BUS
BAR
#2/0-19 STRANDED
TINNED COPPER
GROUND WIRE
NOTE:
ALL ICE BRIDGE POSTS.
EXTEND CONCRETE TO 6"
ABOVE GRADE AND
CROWN TOP
CONDUIT STRAPS
TO SUIT
GK-GROUND KIT
BASE OF TOWER.
1/4"x4"x20" LG
COPPER BUS BAR
(SEE DETAIL)
#2/0-19 STRANDED
TINNED COPPER
GROUND WIRE
ICE BRIDGE POST (TYP)
JUMP ICE BRIDGE SECTIONS.
UTILIZE #2 SOLID TINNED
HYPRESS LUGS ON BOTH
SIDES WITH DOUBLE BOLT
CONNECTIONS (TYP)NEW ICE BRIDGE
ANTENNA
CABLES
JUMP ICE BRIDGE
SECTIONS. UTILIZE #2
SOLID TINNED (TYP)
GK-GROUND KIT
EXTERIOR
COPPER BUS BAR
45° EXIT OUT OF BUILDING SLEEVED IN 3/4" PVC
SCH. 40 CONDUIT, 18" BELOW GRADE ALL
GROUND LEADS GOING BELOW GRADE NEED
SLEEVED
USE VSC-1T-V3C
VERTICAL CADWELD
MOLD
REDCAUTIONCAUTIONCAUTION
BURIED ELECTRIC LINE BELOW
ORANGECAUTIONCAUTIONCAUTION
BURIED TELEPHONE LINE BELOW
TOP OF COMPOUND STONE
DIRECT BURIAL CABLE OR CONDUIT
(POWER, CONTROL, TELEPHONE,
TELEMETERING, ETC)
INSTALLATION
1. THE TAPE SHALL BE LAID DIRECTLY ABOVE THE CABLE OR CONDUIT UNDER RIGID TYPE
AND OIL MAT PAVEMENTS, AND DIRECTLY ON TOP OF THE COMPACTED EARTH
SUBGRADE IMMEDIATELY BEFORE RESTORING THE PAVEMENT.
2. IN OPEN AREAS, THE TAPE SHALL BE LAID DURING THE BACKFILLING OPERATION ON
SMOOTH, COMPACTED BACKFILL AT A DISTANCE OF 8" BELOW THE SURFACE OF THE
AREA.
3. THE ENDS OF THE TAPE SHALL BE LAPPED APPROXIMATELY SIX (6) INCHES.
4. TAPE SHALL BE THE COLOR AS INDICATED AND HAVE THE FOLLOWING MARKINGS:
#2 STRANDED
COPPER WIRE
CADWELD
WIRE TO POSTS
SCALE: N.T.S.5
TOWER LEG BUS BAR DETAIL
SCALE: N/A7
NOT USED
SCALE: N.T.S.6
STANDARD MARKER TAPE DETAIL
SCALE: N.T.S.3
INSPECTION WELL DETAIL
SCALE: N.T.S.2
NOT USED
SCALE: N.T.S.1
COAXIAL GROUNDING AT ICE BRIDGE
SCALE: N.T.S.4
NOT USED
ELECTRIC MOTION CO., INC.
110 GROPPO DR./ BOX 626
WINSTED, CT 06098
PART #EM SGM420-BI-NR
203-009-0118-0002"x2" INSULATOR; FIBERGLASS2
1
ITEM
02-009-0672-000
PART NO.
1 20" GROUND BAR; TINNED OR COPPER
DESCRIPTIONREQ
CAP
FENCE GROUNDING REQUIREMENTS WILL VARY BY OWNER.
SOME MAY OR MAY NOT REQUIRE FABRIC GROUNDING.
33
G-2.0.2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GROUNDING DETAILS & NOTES
GN-2
ANTENNA
FEEDLINE
GROUND KITS
ANTENNA
FEEDLINE
GROUND KITS
ANTENNA
FEEDLINE
GROUND KITS
#6 AWG
#6 AWG
#6 AWG
ANTENNA
FEEDLINE
GROUND KITS
ANTENNA
FEEDLINE
GROUND KITS
#6 AWG
#6 AWG
ANTENNA
FEEDLINE
GROUND KITS
WAVEGUIDE FEEDLINE
GROUND KITS AND COAX
SURGE SUPRESSORS
AC
UNITS
TGB
IGB
EGB
CGB
MGB
#6 AWG
COMM
CABINETS
TOWER
CGBE
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
10 FT LIGHTNING
ROD
CABINETS TIE-DOWN
PLATES, TYP 4 PLCS
ICE BRIDGE
SUPPORTS
#6 AWG
#2/0
THHN
THHN
BTCW
DISC
SW
M
CONDUITS
(IF METAL)
#2 THHN
EXISTING
FENCES,
GATES, ETC.
PROPANE TANK &
GENERATOR
GROUND LUGS
GENERAL NOTES:
1. FOR LEGEND AND ABBREVIATIONS SEE GN-2
SCHEMATIC DIAGRAM - GROUNDING SYSTEM NOTES:
1. #2/0 19 STRAND BARE TINNED COPPER WIRE (BTCW) UNLESS
OTHERWISE NOTED.
2. BOND ANTENNA FEED LINE GROUND KIT CABLE TO GROUND
BAR (SEE SHEET G-2).
3. PROVIDE STRANDED BTCW BURIED GROUND SYSTEM W/
GROUND RODS (SEE SHEET G-1).
4. LIGHTNING ROD GROUND LEADS SHALL BE CONNECTED TO
THE TGB.
5. AN INTERMEDIATE GROUND BAR MAY BE USED WHERE ONE
OR MORE ANTENNAS ARE GROUNDED AT THE SAME
NOMINAL ELEVATION (SEE SHEET G-2).
6. ALL CONNECTIONS TO THE EARTH GROUND SYSTEM TO BE
MADE WITH EXOTHERMIC WELDS.
7. ALL ABOVE GROUND LEADS SHALL BE PROTECTED BY PVC
CONDUIT.
NEW GROUNDNOTE 3
NOTE 6
BTCW
NOTE 5
ANTENNA #1 NOTE
2
ANTENNA #2 NOTE
2
ANTENNA #__
NOTE 2
34
Photo Locations
Bad Creek Hydro Repeater
(LA-SC-617)
100 Bad Creek RD
Salem, SC 29676
35
Monopole Tower Simulation
130-ft AGL
Photo #1 - approx. 150-feet NE of site
Bad Creek Hydro Repeater
(LA-SC-617)
100 Bad Creek RD
Salem, SC 29676
36
Monopole Tower Simulation
130-ft AGL
Photo #2 - approx. 0.4-miles S of site
Bad Creek Hydro Repeater
(LA-SC-617)
100 Bad Creek RD
Salem, SC 29676
37
PROJECT LOCATION DIRECTIONS
1. THE FACILITY IS UNMANNED.
2. A TECHNICIAN WILL VISIT THE SITE APPROXIMATELY ONCE A MONTH FOR
ROUTINE INSPECTION AND MAINTENANCE.
3. THE PROJECT WILL NOT RESULT IN ANY SIGNIFICANT LAND DISTURBANCE
OR EFFECT OF STORM WATER DRAINAGE.
4. NO SANITARY SEWER, POTABLE WATER OR TRASH DISPOSAL IS REQUIRED.
5. HANDICAP ACCESS IS NOT REQUIRED.
6. THE PROJECT DEPICTED IN THESE PLANS QUALIFIES AS AN ELIGIBLE
FACILITIES REQUEST ENTITLED TO EXPEDITED REVIEW UNDER 47 U.S.C. §
1455(A) AS A MODIFICATION OF AN EXISTING WIRELESS TOWER THAT
INVOLVES THE COLLOCATION, REMOVAL, AND/OR REPLACEMENT OF
TRANSMISSION EQUIPMENT THAT IS NOT A SUBSTANTIAL CHANGE UNDER
CFR § 1.61000 (B)(7).
SITE ADDRESS:
100 BAD CREEK RD
SALEM, SC 29676
COUNTY: OCONEE
PARCEL OWNER: DUKE POWER CO
PARCEL ID: 016-00-01-001
GEOGRAPHIC COORDINATES:
LATITUDE: 35° 01' 05.483" N
LONGITUDE: 83° 00' 35.246" W
GROUND ELEVATION: 2456'
ZONING INFORMATION:
JURISDICTION: OCONEE COUNTY
ZONING CLASS: N/A
PROJECT TEAM
APPLICANT:
THE PROPOSED PROJECT CONSISTS OF:
·NEW 120' MONOPOLE
·NEW DUKE ENERGY ICE BRIDGE
·NEW DUKE ENERGY ANTENNAS & ASSOCIATED EQUIPMENT
ON MONOPOLE
DIRECTIONS FROM 9700 DAVID TAYLOR DR, CHARLOTTE, NC 28262:
·GET ON I-85 S FROM DAVID TAYLOR DR AND RESEARCH DR
·CONTINUE STRAIGHT TO STAY ON I-85 S
·TAKE EXIT 70 TO MERGE ONTO I-26 W TOWARD ASHEVILLE
·TAKE EXIT 5 FOR CAROLINA 11 TOWARD CHESNEE/CAMPOBELLO
·TURN LEFT ONTO SC-11 S
·TURN RIGHT ONTO US-276 W
·CONTINUE STRAIGHT ONTO SC-11 S
·TURN RIGHT ONTO SC-130 N
·TURN RIGHT ONTO BAD CREEK RD
·SITE WILL BE ON THE RIGHT
COMPLIANCE CODE
PROJECT DESCRIPTION
POWER COMPANY: DUKE POWER
TELEPHONE COMPANY: TBD
UTILITY COMPANIES
PROJECT SUMMARY
SHEET INDEX
DUKE ENERGY ID NUMBER
LA-SC-617
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
CONSTRUCTION:
SHEET NO:DESCRIPTION:
T-1TITLE SHEET & PROJECT INFORMATION
T-1.1GENERAL NOTES
T-1.2GENERAL NOTES
--SURVEY
C-1ENLARGED SITE PLAN
C-2TOWER ELEVATION
C-2.1TOWER DESIGN
C-2.2TOWER DESIGN
C-3CONSTRUCTION DETAILS
S-1TOWER DETAILS
E-1OVERALL UTILITY PLAN
G-1GROUNDING SITE PLAN
G-2 TO G-2.0.2GROUNDING DETAILS & NOTES
GULF EQUIPMENT CORP.
dba GULF SERVICES
5540 BUSINESS PARKWAY
THEODORE,AL 36582-1616
CONTACT: CUSTOMER SERVICE
PHONE: 251-653-5075
VICINITY MAP
PROJECT NOTES
ENGINEER:
SMW ENGINEERING
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
CONTACT: JEREMY SHARIT, PE
PHONE: 205-397-6781
TITLE SHEET & PROJECT
INFORMATION
DUKE ENERGY CAROLINAS LLC
9700 DAVID TAYLOR BLVD
CHARLOTTE, NC 28262
T-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
TOWER OWNER:
DUKE ENERGY
ALL WORK SHALL BE PERFORMED AND MATERIALS INSTALLED
IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE
FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNMENT
AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUED
TO PERMIT WORK NOT CONFORMING TO THESE CODES.
1. 2021 SOUTH CAROLINA BUILDING CODE OR THE 2021
INTERNATIONAL BUILDING CODE WITH SC MODIFICATIONS
2. 2021 SOUTH CAROLINA RESIDENTIAL CODE OR THE 2021
INTERNATIONAL RESIDENTIAL CODE WITH SC
MODIFICATIONS
3. 2021 SOUTH CAROLINA FIRE CODE OR THE 2021
INTERNATIONAL FIRE CODE WITH SC MODIFICATIONS
4. 2021 SOUTH CAROLINA PLUMBING CODE OR THE 2021
INTERNATIONAL PLUMBING CODE
5. 2021 SOUTH CAROLINA MECHANICAL CODE OR THE 2021
INTERNATIONAL MECHANICAL CODE WITH SC
MODIFICATIONS
6. 2021 SOUTH CAROLINA FUEL GAS CODE OR THE 2021
INTERNATIONAL FUEL GAS CODE WITH SC MODIFICATIONS
7. 2009 SOUTH CAROLINA ENERGY CONSERVATION CODE
8. 2020 NATIONAL ELECTRICAL CODE (NFPA 70) WITH SC
MODIFICATIONS
38
T-1.1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GENERAL NOTES
GENERAL NOTES:
1. ALL REFERENCES TO OWNER HEREIN SHALL BE CONSTRUED TO MEAN DUKE ENERGY
OR ITS DESIGNATED REPRESENTATIVE.
2. ALL WORK PRESENTED ON THESE DRAWINGS MUST BE COMPLETED BY THE
CONTRACTOR UNLESS NOTED OTHERWISE. THE CONTRACTOR MUST HAVE
CONSIDERABLE EXPERIENCE IN PERFORMANCE OF WORK SIMILAR TO THAT DESCRIBED
HEREIN. BY ACCEPTANCE OF THIS ASSIGNMENT, THE CONTRACTOR IS ATTESTING
THAT HE DOES HAVE SUFFICIENT EXPERIENCE AND ABILITY, THAT HE IS
KNOWLEDGEABLE OF THE WORK TO BE PERFORMED AND THAT HE IS PROPERLY
LICENSED AND PROPERLY REGISTERED TO DO THIS WORK IN THE STATE AND/OR
COUNTY IN WHICH IT IS TO BE PERFORMED.
3. UNLESS SHOWN OR NOTED OTHERWISE ON THE CONTRACT DRAWINGS, OR IN THE
SPECIFICATIONS, THE FOLLOWING NOTES SHALL APPLY TO THE MATERIALS LISTED
HEREIN, AND TO THE PROCEDURES TO BE USED ON THIS PROJECT.
4. ALL HARDWARE ASSEMBLY MANUFACTURER'S INSTRUCTIONS SHALL BE FOLLOWED
EXACTLY AND SHALL SUPERCEDE ANY CONFLICTING NOTES ENCLOSED HEREIN.
5. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE
AND SEQUENCE TO INSURE THE SAFETY OF THE STRUCTURE AND ITS COMPONENT
PARTS DURING ERECTION AND/OR FIELD MODIFICATIONS. THIS INCLUDES, BUT IS NOT
LIMITED TO, THE ADDITION OF WHATEVER TEMPORARY BRACING, GUYS OR TIE DOWNS
THAT MAY BE NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN
THE PROPERTY OF THE CONTRACTOR AFTER THE COMPLETION OF THE PROJECT.
6. ALL DIMENSIONS, ELEVATIONS, AND EXISTING CONDITIONS SHOWN ON THE DRAWINGS
SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND THE TESTING AGENCY PRIOR TO
BEGINNING ANY MATERIALS ORDERING, FABRICATION OR CONSTRUCTION WORK ON
THIS PROJECT. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE OWNER AND THE OWNER'S ENGINEER. THE DISCREPANCIES MUST
BE RESOLVED BEFORE THE CONTRACTOR IS TO PROCEED WITH THE WORK. THE
CONTRACT DOCUMENTS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE
CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY
RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
AND PROCEDURES. OBSERVATION VISITS TO THE SITE BY THE OWNER AND/OR THE
ENGINEER SHALL NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR THE
CONSTRUCTION PROCEDURES.
7. ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW AND OF GOOD QUALITY,
FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE CONTRACT
DOCUMENTS. ANY AND ALL SUBSTITUTIONS MUST BE PROPERLY APPROVED AND
AUTHORIZED IN WRITING BY THE OWNER AND ENGINEER PRIOR TO INSTALLATION. THE
CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY
OF THE MATERIALS AND EQUIPMENT BEING SUBSTITUTED.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND
SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK. THE CONTRACTOR IS RESPONSIBLE FOR INSURING THAT THIS PROJECT AND
RELATED WORK COMPLIES WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL SAFETY
CODES AND REGULATIONS GOVERNING THIS WORK.
9. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE LATEST EDITION OF THE
LOCAL BUILDING CODE.
10. ACCESS TO THE PROPOSED WORK SITE MAY BE RESTRICTED. THE CONTRACTOR SHALL
COORDINATE INTENDED CONSTRUCTION ACTIVITY, INCLUDING WORK SCHEDULE AND
MATERIALS ACCESS, WITH THE OWNER FOR APPROVAL.
11. PREFABRICATED BUILDING INSTALLATION SHALL BE IN ACCORDANCE WITH THE
MANUFACTURER'S SPECIFICATIONS.
STRUCTURAL STEEL NOTES:
1. STRUCTURAL STEEL SHALL CONFORM TO THE LATEST EDITION OF THE A.I.S.C.
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS- ALLOWABLE STRESS DESIGN
AND PLASTIC DESIGN INCLUDING THE COMMENTARY AND THE A.I.S.C. CODE OF
STANDARD PRACTICE.
2. STRUCTURAL STEEL PLATES AND SHAPES SHALL CONFORM TO ASTM A26. ALL
STRUCTURAL STEEL PIPES SHALL CONFORM TO ASTM A53 GRADE B. ALL STRUCTURAL
STEEL TUBING SHALL CONFORM TO ASTM A500 GRADE B. ALL STRUCTURAL STEEL
COMPONENTS AND FABRICATED ASSEMBLIES SHALL BE HOT DIP GALVANIZED AFTER
FABRICATION.
3. WELDING SHALL BE IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY (AWS)
D.1.1/D1.1M:2010. STRUCTURAL WELDING CODE-STEEL WELD ELECTRODES SHALL BE
E70XX.
4. ALL COAXIAL CABLE CONNECTORS AND TRANSMITTER EQUIPMENT SHALL BE AS
SPECIFIED BY THE OWNER. THE CONTRACTOR SHALL FURNISH ALL CONNECTION
HARDWARE REQUIRED TO SECURE THE CABLES. CONNECTION HARDWARE SHALL BE
STAINLESS STEEL.
5. ALL REINFORCING STEEL SHALL CONFORM TO ASTM 615 GRADE 60, DEFORMED BILLET
STEEL BARS. WELDED WIRE FABRIC REINFORCING SHALL CONFORM TO ASTM A185.
6. THE FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE
LATEST A.I.S.C. SPECIFICATIONS.
7. ALL CONNECTIONS NOT FULLY DETAILED ON THESE PLANS SHALL BE DETAILED BY THE
STEEL FABRICATOR IN ACCORDANCE WITH A.I.S.C. SPECIFICATIONS.
8. HOT-DIP GALVANIZE ITEMS SPECIFIED TO BE ZINC-COATED, AFTER FABRICATION
WHERE PRACTICAL. GALVANIZING: ASTM A 123, ASTM, A 153/A 153M OR ASTM A 653/A
653M, G90, AS APPLICABLE.
9. REPAIR DAMAGED SURFACES WITH GALVANIZING REPAIR METHOD AND PAINT
CONFORMING TO ASTM A 780 OR BY APPLICATION OF STICK OR THICK PASTE MATERIAL
SPECIFICALLY DESIGNED FOR REPAIR OF GALVANIZING. CLEAN AREAS TO BE
REPAIRED, AND REMOVE SLAG FROM WELDS. HEAT SURFACES TO WHICH STICK OR
PASTE MATERIAL IS APPLIED WITH A TORCH TO A TEMPERATURE SUFFICIENT TO MELT
THE METALLICS. IN STICK OR PASTE, SPREAD MOLTEN MATERIAL UNIFORMLY OVER
SURFACES TO BE COATED AND WIPE OFF EXCESS MATERIAL.
10. CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S INSTRUCTIONS/SPECIFICATIONS
IF NO INFORMATION IS CONTAINED IN THESE PLANS OR IF THE MANUFACTURER'S
SPECIFICATIONS ARE STRICTER.
NOTE: REFER TO DUKE ENERGY SPECIFICATIONS AS THE CONTROLLING STANDARD
FOR PROPOSED CONSTRUCTION.
PERMITS:
1. CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS FOR THIS PROJECT FROM ALL
APPLICABLE GOVERNMENTAL AGENCIES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ABIDING BY ALL CONDITIONS AND
REQUIREMENTS OF THE PERMITS.
3. ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES AND THE ACI 318-08,
"BUILDING REQUIREMENTS FOR STRUCTURAL CONCRETE".
4. THE CONTRACTOR SHALL NOTIFY THE APPLICABLE JURISDICTIONAL (STATE, COUNTY
OR CITY) ENGINEER 24 HOURS PRIOR TO THE BEGINNING OF CONSTRUCTION.
5. ALL DIMENSIONS SHALL BE VERIFIED WITH THE PLANS (LATEST REVISION) PRIOR TO
COMMENCING CONSTRUCTION. NOTIFY THE OWNER IMMEDIATELY IF DISCREPANCIES
ARE DISCOVERED. THE CONTRACTOR SHALL HAVE A SET OF APPROVED PLANS
AVAILABLE AT THE SITE AT ALL TIMES WHEN WORK IS BEING PERFORMED. A
DESIGNATED RESPONSIBLE EMPLOYEE SHALL BE AVAILABLE FOR CONTACT BY
GOVERNING AGENCY INSPECTORS.
MISCELLANEOUS:
1. ALL THREADED STRUCTURAL FASTENERS FOR ANTENNA SUPPORT ASSEMBLES SHALL
CONFORM TO ASTM A307 OR ASTM 36. ALL STRUCTURAL FASTNERS FOR STRUCTURAL
STEEL FRAMING SHALL CONFORM TO ASTM A325. FASTENERS SHALL BE 5/8" MIN. DIA.
BEARING TYPE CONNECTIONS WITH THREADS EXCLUDED FROM THE PLANE. ALL
EXPOSED FASTENERS, NUTS, AND WASHERS SHALL BE GALVANIZED UNLESS
OTHERWISE NOTED. ALL ANCHORS INTO CONCRETE SHALL BE STAINLESS STEEL.
2. THE CONTRACTOR SHALL FURNISH ALL CONNECTION HARDWARE REQUIRED TO
SECURE THE CABLES. CONNECTION HARDWARE SHALL BE STAINLESS STEEL.
3. NORTH ARROW SHOWN ON PLANS REFERS TO TRUE NORTH. CONTRACTOR SHALL
VERIFY NORTH AND NOTIFY CONSULTANT OF ANY DISCREPANCY BEFORE STARTING
CONSTRUCTION.
4. PROVIDE LOCK WASHERS FOR ALL MECHANICAL CONNECTIONS FOR GROUND
CONDUCTORS. USE STAINLESS STEEL HARDWARE THROUGHOUT.
5. THOROUGHLY REMOVE ALL PAINT AND CLEAN ALL DIRT FROM SURFACES REQUIRING
GROUND CONNECTIONS.
6. MAKE ALL GROUND CONNECTIONS AS SHORT AND DIRECT AS POSSIBLE. AVOID SHARP
BENDS. ALL BENDS TO BE A MIN. OF 8" RADIUS.
7. FOR ALL EXTERNAL GROUND CONNECTIONS, CLAMPS AND CADWELDS, APPLY A
LIBERAL PROTECTIVE COATING OR AN ANTI-OXIDE COMPOUND SUCH AS 'NO-OXIDE A'
BY DEARBORN CHEMICAL COMPANY.
8. REPAIR ALL METAL SURFACES THAT HAVE BEEN CUT OR DAMAGED BY REMOVING ANY
EXISTING RUST AND APPLYING COLD GALVANIZATION.
9. ANTENNA CABLE LENGTHS HAVE BEEN DETERMINED BASED ON THESE PLANS. CABLE
LENGTHS LISTED ARE APPROXIMATED AND ARE NOT INTENDED TO BE USED FOR
FABRICATION. DUE TO FIELD CONDITIONS, ACTUAL CABLE LENGTHS VARY.
CONTRACTOR MUST FIELD VERIFY ANTENNA CABLE LENGTHS PRIOR TO ORDER.
39
T-1.2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GENERAL NOTES
FENCE
M
X
G
CONTOUR LINE
PROPERTY LINE/ROW
LEASE AREA
EASEMENT
DISCONNECT SWITCH
METER
CIRCUIT BREAKER
CODED NOTE NUMBER
CHEMICAL GROUND ROD
GROUND ROD
GROUND ROD W/ INSPECTION
SLEEVE
CADWELD TYPE CONNECTION
COMPRESSION TYPE CONNECTION
GROUND WIRE
xxxxxxxxxx
SYMBOL LEGEND:ABBREVIATIONS :
A.B. ANCHOR BOLT
AGL ABOVE GROUND LEVEL
AMSL ABOVE MEAN SEA LEVEL
APPROX APPROXIMATE
ASR ANTENNA STRUCTURE REGISTRATION
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAUGE
BCW BARE COPPER WIRE
BTCW BARE TINNED COPPER WIRE
CGB COAX GROUND BAR (SHELTER)
CGBE COAX GROUND BAR EXTERIOR
CLR CLEAR
COMM COMMUNICATIONS
COND CONDUIT
CU COPPER
DET DETAIL
DIA DIAMETER
DV DIVERSITY
DWG DRAWING
EGB EXTERIOR GROUND BAR
EL= ELEVATION EQUALS (AMSL, UNLESS OTHERWISE NOTED)
EQUIP EQUIPMENT
EW EACH WAY
EXP EXPANSION
FDN FOUNDATION
FFE FINISHED FLOOR ELEVATION
FLEX FLEXIBLE
FOC FIBER OPTIC CABLE
GA GAUGE
GALV GALVANIZED
GEN GENERATOR
GCFI GROUND FAULT CIRCUIT INTERRUPTER
HDPE HIGH DENSITY POLYETHYLENE
HVAC HEATING, VENTILATION, & AIR CONDITIONING
I.D. INTERIOR DIAMETER
IGB INTERMEDIATE GROUND BAR
IGR INTERIOR GROUND RING (SHELTER)
kVA KILOVOLT AMPERES
LMR LAND MOBILE RADIO
LPG LIQUID PETROLEUM GAS
MAS MULTIPLE ADDRESS (RADIO) SYSTEM
MAX MAXIMUM
MGB MASTER GROUND BAR
MIN MINIMUM
MISC MISCELLANEOUS
MTS MANUAL TRANSFER SWITCH
MW MICROWAVE
MW-DV MICROWAVE DIVERSITY
PLCS PLACES
PSI POUNDS per SQUARE INCH
PVC POLYVINYL CHLORIDE (CONDUIT)
REQ'D REQUIRED
RGS RIGID GALVANIZED STEEL (CONDUIT)
SCHED SCHEDULE
SCHEM SCHEMATIC
SYS SYSTEM
T&B TOP & BOTTOM
TBD TO BE DETERMINED
TELCO TELEPHONE COMPANY
TGB TOWER GROUND BAR
T.O.C. TOP OF CONCRETE
T.O.S. TOP/TOE OF SLOPE
TYP TYPICAL
XFMR TRANSFORMER
40
41
42
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP UGP
UGP
UGP
UGP
UGP
UGP
G
C-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
ENLARGED SITE PLAN
10'010' 5'
SCALE: 1"=5' (22X34)
1"=10' (11X17)
EXISTING TREES TO BE REMOVED
WITHIN COMPOUND AND EASEMENT.
CONTRACTOR TO FIELD VERIFY BEFORE
CONSTRUCTION
EXISTING GENERATOR
ON CONCRETE PAD
EXISTING
LP TANK
EXISTING
UNDERGROUND
POWER (TYP)
EXISTING EDGE
OF GRAVEL
EXISTING
TREELINE
EXISTING
ICE BRIDGE
PROPOSED 120'
MONOPOLE
PROPOSED ±19'
ICE BRIDGE (TYP)
EXISTING SELF
SUPPORT TOWER
EXISTING 18' WIDE
ASPHALT DRIVE
EXISTING OVERHEAD
POWER LINE (TYP)
EXISTING DUKE ENERGY
EQUIPMENT SHELTER
CONTRACTOR TO CUT OPENING
AND INSTALL COAX HATCH PLATE
ON SIDE OF EXISTING SHELTER
43
C-2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
PROPOSED
MONOPOLE
PROPOSED 10'
LIGHTNING ROD
TOWER ELEVATION
16'016' 8'
SCALE: 1"=8' (22X34)
1"=16' (11X17)
TOP OF PROPOSED TOWER
ELEV.: 120'-0" AGL
TOTAL TOWER HEIGHT
INCLUDING APPURTENANCES
ELEV.: 130'-0" AGL
PROPOSED DUKE ANTENNA MOUNT
ELEV.: 117'-0" AGL
PROPOSED DUKE ANTENNA
ELEV.: 122'-6" AGL
PROPOSED DUKE ANTENNA
ELEV.: 102'-6" AGL
PROPOSED DUKE ANTENNA MOUNT
ELEV.: 97'-0" AGL
44
C-2.1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
TOWER DESIGN
45
C-2.2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
TOWER DESIGN
46
C-3
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
CONSTRUCTION DETAILS
2'-0"
7'-0" CLEAR4'-0"
4"
(MAX.)
12"
3000 PSI CONCRETE
CRUSHED STONE ON
OTHER SURFACE
1/2" CROWN TOP
3 1/2"GALVANIZED PIPE. 8'-0" MAXIMUM
SPACING. PLACE EACH ON ALTERNATE
SIDE OF BRIDGE.
NEW DC AND FIBER
CABLES CLAMPED TO
UNISTRUT
2"X2" HD. G. UNISTRUT @ 3'-0"
O.C. MAX.
2"X2" HD. G. UNISTRUT @ 3'-0" O.C. MAX.
WAVEGUIDE BRIDGE
SUPPORT BRACKET
NEW GPS ANTENNA
2ICE BRIDGE CABLE DETAIL
SCALE: NOT TO SCALE
ICE BRIDGE NOTE:
·PRIOR TO CONSTRUCTION FIELD
COORDINATE HEIGHT AND ROUTE OF ICE
BRIDGE WITH TOWER OWNER
·ALL SUPPORT POSTS MUST BE GROUNDED
1GPS ANTENNA MOUNTING DETAIL
SCALE: NOT TO SCALE
GPS
1.32" O.D. x 14" MAX.
MOUNTING PIPE
1/2"Ø BOLT (TYP.)
GPS MOUNT ON
SWIC WALL
CABLES (PROVIDED
W/ ANTENNA)
ESTABLISH CONNECTION
AND PROVIDE
WEATHERPROOF KIT
NOTES:
1. LOCATION OF GPS MUST HAVE CLEAR
VIEW OF SOUTHERN SKY AND CANNOT
HAVE ANY BLOCKAGES EXCEEDING
25% OF THE SURFACE AREA OF A
HEMISPHERE AROUND THE GPS.
2. ALL GPS LOCATIONS MUST BE ABLE TO
RECEIVE CLEAR SIGNALS FROM A
MINIMUM OF FOUR (4) SATELLITES.
VERIFY WITH HANDHELD GPS BEFORE
FINAL LOCATION OF GPS.
47
S-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
TOWER DETAILS
TOWER ELEVATION
DETAIL 1
GENERAL CONSTRUCTION NOTES:
INSTALLATION NOTES:
48
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
op
T
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UNDERGROUND POWER
(RED PAINT, MARKED
BY OTHERS)
POWER BOX ON
CONCRETE PAD
T
T
UNDERGROUND COMMUNICATION
(ORANGE PAINT, MARKED BY OTHERS)
UGP
UNDERGROUND POWER
(RED PAINT, MARKED
BY OTHERS)
UNDERGROUND GAS
(YELLOW PAINT, MARKED
BY OTHERS)
UTILITY/METER RACK
18' WIDE
ASPHALT DRIVE
E-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
OVERALL UTILITY PLAN
50'050' 25'
SCALE: 1"=25' (11X17)
1"=50' (22X34)
PROPOSED 120'
MONOPOLE
PROPOSED ±19'
ICE BRIDGE (TYP)
EXISTING POWER
POLE (TYP)
EXISTING TELCO
PEDESTAL (TYP)
EXISTING SELF
SUPPORT TOWER
EXISTING LP TANK
EXISTING TREELINE
EXISTING OVERHEAD
POWER LINE (TYP)
EXISTING DUKE ENERGY
EQUIPMENT SHELTER
2-2" PVC FROM SERVICE POLE TO
HANDHOLE PLACED WITHIN 5' OF
SERVICE POLE
. 1-4" PVC FROM HANDHOLE TO
12"x12"x6" JUNCTION BOX AT SHELTER
WITH TRACER WIRE AND PULL STRING
12"x12"x6" PVC JUNCTION
BOX AT BUILDING. WITH 1-4"
PENETRATION TO SHELTER
2-2" PVC FROM SERVICE POLE TO HANDHOLE
PLACED WITHIN 5' OF SERVICE POLE
. 1-4" PVC FROM HANDHOLE TO 12"x12"x6"
JUNCTION BOX AT SHELTER WITH TRACER
WIRE AND PULL STRING
49
G-1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GROUNDING SITE PLAN
1
2
4
10'010' 5'
SCALE: 1"=5' (22X34)
1"=10' (11X17)
EXISTING GENERATOR
ON CONCRETE PAD
EXISTING
LP TANK
EXISTING EDGE
OF GRAVEL
EXISTING
TREELINE
EXISTING
ICE BRIDGE
PROPOSED 120'
MONOPOLE
PROPOSED ±19'
ICE BRIDGE (TYP)
EXISTING SELF
SUPPORT TOWER
EXISTING DUKE ENERGY
EQUIPMENT SHELTER
3
6
1GROUNDING SITE PLAN
SCALE: AS NOTED
10
5
9
50
G-2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GROUNDING DETAILS & NOTES
SCALE: N.T.S.1
CADWELD GROUNDING CONNECTION DETAILS
SCALE: N.T.S.2
ANTENNA & CABLE GROUNDING
SCALE: N.T.S.5
GROUNDING STRAP WEATHERPROOFING DETAIL
SCALE: N.T.S.6
TYPICAL GROUND BAR CONNECTION DETAIL
SCALE: N.T.S.4
GENERAL LUG DETAIL
SCALE: N.T.S.3
GROUNDING ROD DETAIL
51
G-2.0.1
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GROUNDING DETAILS & NOTES
NOTCH SIDES OF 8" PVC SCH 40
PIPE TO ALLOW EXIT/ENTRANCE OF
GROUND RINGGROUND RING
5/8"x10' GROUND ROD
TRENCH BOTTOM
FINISHED GRADE
GALV. STEEL
Ø .469x.719 TYP
(41) PL
Ø .469x.719 TYP
(41) PL
1
BOLT TO ANGLE IRON
(OR TOWER LEG)
HARDWARE
2
GROUNDING CONDUCTORS
CONTINUED TO GROUND LOOP
SEE PLAN
TOP OF CRUSHED STONE
ANTENNA CABLES
TOWER
MOUNTING PLATE FOR
GROUND BAR (TO SUIT)
STAND-OFF INSULATORS
(2)-#2/0-19 STRANDED TINNED COPPER GROUND
WIRE IN PVC SCH. 40 CONDUIT (TYP). EXTEND
CONDUIT 6" BELOW GRADE. GROUND WIRE TO BUS
BAR
#2/0-19 STRANDED
TINNED COPPER
GROUND WIRE
NOTE:
ALL ICE BRIDGE POSTS.
EXTEND CONCRETE TO 6"
ABOVE GRADE AND
CROWN TOP
CONDUIT STRAPS
TO SUIT
GK-GROUND KIT
BASE OF TOWER.
1/4"x4"x20" LG
COPPER BUS BAR
(SEE DETAIL)
#2/0-19 STRANDED
TINNED COPPER
GROUND WIRE
ICE BRIDGE POST (TYP)
JUMP ICE BRIDGE SECTIONS.
UTILIZE #2 SOLID TINNED
HYPRESS LUGS ON BOTH
SIDES WITH DOUBLE BOLT
CONNECTIONS (TYP)NEW ICE BRIDGE
ANTENNA
CABLES
JUMP ICE BRIDGE
SECTIONS. UTILIZE #2
SOLID TINNED (TYP)
GK-GROUND KIT
EXTERIOR
COPPER BUS BAR
45° EXIT OUT OF BUILDING SLEEVED IN 3/4" PVC
SCH. 40 CONDUIT, 18" BELOW GRADE ALL
GROUND LEADS GOING BELOW GRADE NEED
SLEEVED
USE VSC-1T-V3C
VERTICAL CADWELD
MOLD
REDCAUTIONCAUTIONCAUTION
BURIED ELECTRIC LINE BELOW
ORANGECAUTIONCAUTIONCAUTION
BURIED TELEPHONE LINE BELOW
TOP OF COMPOUND STONE
DIRECT BURIAL CABLE OR CONDUIT
(POWER, CONTROL, TELEPHONE,
TELEMETERING, ETC)
INSTALLATION
1. THE TAPE SHALL BE LAID DIRECTLY ABOVE THE CABLE OR CONDUIT UNDER RIGID TYPE
AND OIL MAT PAVEMENTS, AND DIRECTLY ON TOP OF THE COMPACTED EARTH
SUBGRADE IMMEDIATELY BEFORE RESTORING THE PAVEMENT.
2. IN OPEN AREAS, THE TAPE SHALL BE LAID DURING THE BACKFILLING OPERATION ON
SMOOTH, COMPACTED BACKFILL AT A DISTANCE OF 8" BELOW THE SURFACE OF THE
AREA.
3. THE ENDS OF THE TAPE SHALL BE LAPPED APPROXIMATELY SIX (6) INCHES.
4. TAPE SHALL BE THE COLOR AS INDICATED AND HAVE THE FOLLOWING MARKINGS:
#2 STRANDED
COPPER WIRE
CADWELD
WIRE TO POSTS
SCALE: N.T.S.5
TOWER LEG BUS BAR DETAIL
SCALE: N/A7
NOT USED
SCALE: N.T.S.6
STANDARD MARKER TAPE DETAIL
SCALE: N.T.S.3
INSPECTION WELL DETAIL
SCALE: N.T.S.2
NOT USED
SCALE: N.T.S.1
COAXIAL GROUNDING AT ICE BRIDGE
SCALE: N.T.S.4
NOT USED
ELECTRIC MOTION CO., INC.
110 GROPPO DR./ BOX 626
WINSTED, CT 06098
PART #EM SGM420-BI-NR
203-009-0118-0002"x2" INSULATOR; FIBERGLASS2
1
ITEM
02-009-0672-000
PART NO.
1 20" GROUND BAR; TINNED OR COPPER
DESCRIPTIONREQ
CAP
FENCE GROUNDING REQUIREMENTS WILL VARY BY OWNER.
SOME MAY OR MAY NOT REQUIRE FABRIC GROUNDING.
52
G-2.0.2
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE
ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL
ENGINEER, TO ALTER THIS DOCUMENT.
SHEET NUMBER:
ISSUED FOR:
REV DESCRIPTION BY DATE
A CLIENT REVIEW CLW 04/05/24
SMW JOB #21-2705.1
SITE ADDRESS
100 BAD CREEK RD
SALEM, SC 29676
0 CONSTRUCTION CLW 05/17/24
09/12/2024
1 CONSTRUCTION AMD 09/12/24
158 BUSINESS CENTER DRIVE
BIRMINGHAM, AL 35244
TEL: 205-252-6985 www.smweng.com
ENGINEERING GROUP, LLC
TOGETHER PLANNING A BETTER TOMORROW
DUKE ENERGY ID NUMBER
LA-SC-617
DUKE ENERGY SITE NAME
BAD CREEK HYDRO REPEATER
GROUNDING DETAILS & NOTES
GN-2
ANTENNA
FEEDLINE
GROUND KITS
ANTENNA
FEEDLINE
GROUND KITS
ANTENNA
FEEDLINE
GROUND KITS
#6 AWG
#6 AWG
#6 AWG
ANTENNA
FEEDLINE
GROUND KITS
ANTENNA
FEEDLINE
GROUND KITS
#6 AWG
#6 AWG
ANTENNA
FEEDLINE
GROUND KITS
WAVEGUIDE FEEDLINE
GROUND KITS AND COAX
SURGE SUPRESSORS
AC
UNITS
TGB
IGB
EGB
CGB
MGB
#6 AWG
COMM
CABINETS
TOWER
CGBE
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
BTCW
10 FT LIGHTNING
ROD
CABINETS TIE-DOWN
PLATES, TYP 4 PLCS
ICE BRIDGE
SUPPORTS
#6 AWG
#2/0
THHN
THHN
BTCW
DISC
SW
M
CONDUITS
(IF METAL)
#2 THHN
EXISTING
FENCES,
GATES, ETC.
PROPANE TANK &
GENERATOR
GROUND LUGS
GENERAL NOTES:
1. FOR LEGEND AND ABBREVIATIONS SEE GN-2
SCHEMATIC DIAGRAM - GROUNDING SYSTEM NOTES:
1. #2/0 19 STRAND BARE TINNED COPPER WIRE (BTCW) UNLESS
OTHERWISE NOTED.
2. BOND ANTENNA FEED LINE GROUND KIT CABLE TO GROUND
BAR (SEE SHEET G-2).
3. PROVIDE STRANDED BTCW BURIED GROUND SYSTEM W/
GROUND RODS (SEE SHEET G-1).
4. LIGHTNING ROD GROUND LEADS SHALL BE CONNECTED TO
THE TGB.
5. AN INTERMEDIATE GROUND BAR MAY BE USED WHERE ONE
OR MORE ANTENNAS ARE GROUNDED AT THE SAME
NOMINAL ELEVATION (SEE SHEET G-2).
6. ALL CONNECTIONS TO THE EARTH GROUND SYSTEM TO BE
MADE WITH EXOTHERMIC WELDS.
7. ALL ABOVE GROUND LEADS SHALL BE PROTECTED BY PVC
CONDUIT.
NEW GROUNDNOTE 3
NOTE 6
BTCW
NOTE 5
ANTENNA #1 NOTE
2
ANTENNA #2 NOTE
2
ANTENNA #__
NOTE 2
53
Mail Processing Center
Federal Aviation Administration
Southwest Regional Office
Obstruction Evaluation Group
10101 Hillwood Parkway
Fort Worth, TX 76177
Aeronautical Study No.
2024-ASO-2171-OE
Page 1 of 4
Issued Date: 03/25/2024
Kevin Hursey
Duke Energy Business Services, LLC
9700 David Taylor Dr.
Charlotte, NC 28202
** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **
The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C.,
Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning:
Structure: Antenna Tower Bad Creek Hydro Repeater
Location: Salem, SC
Latitude: 35-01-05.48N NAD 83
Longitude: 83-00-35.25W
Heights: 2456 feet site elevation (SE)
124 feet above ground level (AGL)
2580 feet above mean sea level (AMSL)
This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a
hazard to air navigation provided the following condition(s), if any, is(are) met:
Based on this evaluation, marking and lighting are not necessary for aviation safety. However, if marking/
lighting are accomplished on a voluntary basis, we recommend it be installed in accordance with FAA Advisory
circular 70/7460-1 M.
This determination expires on 09/25/2025 unless:
(a) the construction is started (not necessarily completed) and FAA Form 7460-2, Notice of Actual
Construction or Alteration, is received by this office.
(b) extended, revised, or terminated by the issuing office.
(c) the construction is subject to the licensing authority of the Federal Communications Commission
(FCC) and an application for a construction permit has been filed, as required by the FCC, within
6 months of the date of this determination. In such case, the determination expires on the date
prescribed by the FCC for completion of construction, or the date the FCC denies the application.
NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST
BE E-FILED AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. AFTER RE-EVALUATION
OF CURRENT OPERATIONS IN THE AREA OF THE STRUCTURE TO DETERMINE THAT NO
54
Page 2 of 4
SIGNIFICANT AERONAUTICAL CHANGES HAVE OCCURRED, YOUR DETERMINATION MAY BE
ELIGIBLE FOR ONE EXTENSION OF THE EFFECTIVE PERIOD.
This determination is based, in part, on the foregoing description which includes specific coordinates, heights,
frequency(ies) and power. Any changes in coordinates, heights, and frequencies or use of greater power, except
those frequencies specified in the Colo Void Clause Coalition; Antenna System Co-Location; Voluntary Best
Practices, will void this determination. Any future construction or alteration, including increase to heights,
power, or the addition of other transmitters, requires separate notice to the FAA.This determination includes all
previously filed frequencies and power for this structure.
If construction or alteration is dismantled or destroyed, you must submit notice to the FAA within 5 days after
the construction or alteration is dismantled or destroyed.
This determination does include temporary construction equipment such as cranes, derricks, etc., which may be
used during actual construction of the structure. However, this equipment shall not exceed the overall heights as
indicated above. Equipment which has a height greater than the studied structure requires separate notice to the
FAA.
This determination concerns the effect of this structure on the safe and efficient use of navigable airspace
by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or
regulation of any Federal, State, or local government body.
A copy of this determination will be forwarded to the Federal Communications Commission (FCC) because the
structure is subject to their licensing authority.
If we can be of further assistance, please contact Robert Kiser, at (404) 305-6616, or Robert.K-
CTR.Kiser@faa.gov. On any future correspondence concerning this matter, please refer to Aeronautical Study
Number 2024-ASO-2171-OE.
Signature Control No: 610979739-616417461 ( DNE )
Eric F Johnston
Manager, Obstruction Evaluation Group
Attachment(s)
Frequency Data
Map(s)
cc: FCC
55
Page 3 of 4
Frequency Data for ASN 2024-ASO-2171-OE
LOW
FREQUENCY
HIGH
FREQUENCY
FREQUENCY
UNIT ERP
ERP
UNIT
6 7 GHz 55 dBW
6 7 GHz 42 dBW
10 11.7 GHz 55 dBW
10 11.7 GHz 42 dBW
614 698 MHz 1000 W
614 698 MHz 2000 W
698 806 MHz 1000 W
806 901 MHz 500 W
806 824 MHz 500 W
824 849 MHz 500 W
851 866 MHz 500 W
869 894 MHz 500 W
896 901 MHz 500 W
901 902 MHz 7 W
929 932 MHz 3500 W
930 931 MHz 3500 W
931 932 MHz 3500 W
932 932.5 MHz 17 dBW
935 940 MHz 1000 W
940 941 MHz 3500 W
56
Page 4 of 4
Sectional Map for ASN 2024-ASO-2171-OE
57
1 BUILDING A SMARTER ENERGY FUTURE®
9700 David Taylor Dr.
Charlotte, NC 28262
704-382-3242
August 16, 2024
James Coley, Director
Oconee County Planning and Zoning
415 S. Pine Street
Walhalla, SC 29691
Phone: (864) 638.4218
Subject: Duke Energy Bad Creek Abandonment letter
Dear: Oconee County
Duke Energy is requesting the installation of a Telecommunications Pole to the existing Bad Creek site.
This project supports Duke Energy's local generation plant radio system for safe and secure operations of the
plant.
In the event the pole is abandoned, Duke Energy will remove the pole within 120 days of notice requiring
approval per the jurisdiction’s requirements. If a shorter period is requested for the removal of the pole Duke
Energy will work with the jurisdiction’s officials at the time to work out a timeline that works for both parties.
Sincerely,
Patrick Bernier, PE
Senior Project Manager
58
Holder Identifier : 7777777707070700077763616065553330752417777215477407763224763517120070641466265211110760405475277575007606414223411112074675142072666750762516202760311007620403750767102077727252025773110777777707000707007
6666666606060600062606466204446200602222606004022206222004260062002062222040600600220620220626204200006202206262240220060200042622600220622020426204002206222026040062002066646062240664440666666606000606006Certificate No : 570107789502
CERTIFICATE OF LIABILITY INSURANCE
DATE(MM/DD/YYYY)
08/26/2024
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If
SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this
certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
PRODUCER
Aon Risk Services South, Inc.
Charlotte NC Office
MSC# 17693
PO Box 551343
Atlanta GA 30355 USA
PHONE
(A/C. No. Ext):
E-MAIL
ADDRESS:
INSURER(S) AFFORDING COVERAGE NAIC #
(866) 283-7122
INSURED 33600LM Insurance CorporationINSURER A:
23035Liberty Mutual Fire Ins CoINSURER B:
21458Employers Insurance Company of WausauINSURER C:
AA3191004Bison Insurance Company LtdINSURER D:
INSURER E:
INSURER F:
FAX
(A/C. No.): (800) 363-0105
CONTACT
NAME:
Duke Energy Corporation
525 South Tryon Street
Mail Code DEP 16A
Attn Lance Burnette
Charlotte NC 28202 USA
COVERAGES CERTIFICATE NUMBER: 570107789502 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Limits shown are as requested
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
(MM/DD/YYYY)
SUBR
WVD
INSR
LTR
ADDL
INSD POLICY NUMBER TYPE OF INSURANCE LIMITS
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
POLICY LOC
EACH OCCURRENCE
DAMAGE TO RENTED
PREMISES (Ea occurrence)
MED EXP (Any one person)
PERSONAL & ADV INJURY
GENERAL AGGREGATE
PRODUCTS - COMP/OP AGG
X
X
X
GEN'L AGGREGATE LIMIT APPLIES PER:
$2,000,000
$1,000,000
$10,000
$2,000,000
$4,000,000
$4,000,000
D 09/01/2024 09/01/2025BISON2024XS
PRO-
JECT
OTHER:
AUTOMOBILE LIABILITY
ANY AUTO
OWNED
AUTOS ONLY
SCHEDULED
AUTOS
HIRED AUTOS
ONLY
NON-OWNED
AUTOS ONLY
BODILY INJURY ( Per person)
PROPERTY DAMAGE
(Per accident)
X
X
BODILY INJURY (Per accident)
$2,000,000D 09/01/2024 09/01/2025
CLAIMS-MADE
COMBINED SINGLE LIMIT
(Ea accident)
BISON2024XS
EXCESS LIAB X
OCCUR
CLAIMS-MADE AGGREGATE
EACH OCCURRENCE
DED
$1,000,000
$1,000,000
09/01/2024UMBRELLA LIABD 09/01/2025BISON2024XS
RETENTION
X
E.L. DISEASE-EA EMPLOYEE
E.L. DISEASE-POLICY LIMIT
E.L. EACH ACCIDENT $2,000,000
X OTH-
ER
PER STATUTEC 09/01/2024 09/01/2025
AOS
BISON2024XSD 09/01/2024 09/01/2025
$2,000,000
Y / N
(Mandatory in NH)
ANY PROPRIETOR / PARTNER / EXECUTIVE
OFFICER/MEMBER EXCLUDED? N / AN
EL-NC,SC,OH,IN,FL,TN,KY
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
If yes, describe under
DESCRIPTION OF OPERATIONS below
$2,000,000
WCC641443955024
Employers LiabilityEW264N443955064 09/01/2024 09/01/2025
IN, KY, NC, OH, SC, TN
Excess Workers CompensationB
SIR applies per policy terms & conditions
$1,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
As respects BISON2024XS, Aon Commercial Risk (U.S.) is generating and distributing this certificate in an administrative
capacity. Coverage is Independently Procured by the Insured. Aon Insurance Managers is the Insurance Manager and/or authorized
representative. Where delineated to provide additional insured and/or waiver of subrogation for coverages, the insurance
programs respond in accordance with written contract. Insurance policies include certificate holder as additional insured and
waiver of subrogation where required by written contract, subject to the terms and conditions of the policy.
CANCELLATIONCERTIFICATE HOLDER
AUTHORIZED REPRESENTATIVE
Duke Energy Corporation
525 South Tryon Street
Mail Code DEP 16A
Charlotte NC 28202 USA
ACORD 25 (2016/03)
©1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE
POLICY PROVISIONS.
59
AGENCY CUSTOMER ID:
ADDITIONAL REMARKS SCHEDULE
LOC #:
ADDITIONAL REMARKS
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER: ACORD 25 FORM TITLE: Certificate of Liability Insurance
EFFECTIVE DATE:
CARRIER NAIC CODE
POLICY NUMBER
NAMED INSUREDAGENCY
See Certificate Number:
See Certificate Number:
570107789502
570107789502
Aon Risk Services South, Inc.
570000019981
ADDITIONAL POLICIES If a policy below does not include limit information, refer to the corresponding policy on the ACORD
certificate form for policy limits.
INSURER
INSURER
INSURER
INSURER
INSURER(S) AFFORDING COVERAGE
Page _ of _
NAIC #
Duke Energy Corporation
TYPE OF INSURANCE
POLICY NUMBER LIMITS
OTHER
A Miscellaneous Liability
Coverages
EW564N443955054 09/01/2024 09/01/2025 Employers
Liability
$1,000,000
Excess WC - FL
ADDL
INSD
INSR
LTR
SUBR
WVD
POLICY
EFFECTIVE
DATE
(MM/DD/YYYY)
POLICY
EXPIRATION
DATE
(MM/DD/YYYY)
SIR applies per policy terms & conditions
ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
60
Bad Creek Repeater Indemnity Letter
Duke Energy Carolinas, LLC (“Duke Energy”), plans to build and operate a communications tower located
at 100 Bad Creek Road, Salem, SC 29676 (Parcel ID: 016-00-01-013) (the “Tower”). To the extent
permitted by law, Duke Energy shall indemnify and hold the County of Oconee (“Oconee”) harmless
from all liabilities, costs, damages, expenses, claims, demands, or judgments, including without
limitation, court costs and reasonable attorney’s’ fees, incurred by Oconee in defense of any claim or
action brought against Oconee by an unrelated third party for injury to persons or property resulting
directly from Duke Energy’s negligence or intentional misconduct while constructing or operating the
Tower.
In witness hereof, Duke Energy has caused this Indemnification Letter to be duly executed by
the authorized signature below.
By:
Name:
Title:
Kevin L. Lee
Manager, Real Estate II
61
Official Copy
FCC 854R
UNITED STATES OF AMERICA
FEDERAL COMMUNICATIONS COMMISSION
ANTENNA STRUCTURE REGISTRATION
OWNER:
FCC Registration Number (FRN):
Antenna Structure Registration Number
Issue Date
Location of Antenna Structure
County:
Ground Elevation (AMSL)
meters
Overall Height Above Ground (AGL)
meters
Latitude Longitude
NAD83
Overall Height Above Mean Sea Level (AMSL)
meters
Center of Array Coordinates Type of Structure
Painting and Lighting Requirements:
Conditions:
This registration is effective upon completion of the described antenna structur e and notification to the
Commission. YOU MUST NOTIFY THE COMMISSION WITHIN 5 DAYS OF COMPLETION OF
CONSTRUCTION OR CANCELLATION OF YOUR PROJECT, please file FCC Form 854. To file
electronically, connect to the antenna structure registration system by pointing your web browser to
https://www.fcc.gov/antenna-structure-registration. Electronic filing is required. Use purpose code “NT”
for notification of completion of construction; use purpose code “CA” to cancel yo ur registration.
The Antenna Structure Registration is not an authorization to construct radio facilities or transmit radio
signals. It is necessary that all radio equipment on this structure be covered by a valid FCC license or
construction permit.
You must immediately provide a copy of this Registration to all tenant licensees and permittees
sited on the structure described on this Registration (although not required, you may want to use
Certified Mail to obtain proof of receipt), and display your Registration Number at the site. See
reverse for important information about the Commission’s Antenna Structure Registration rules.
Duke Energy Business Services, LLC
0020991360
1328116
06/17/2024
Salem, SC 29676
Northeast of the existing tower off of Bad Creek Road
OCONEE
35- 01- 05.5 N 083- 00- 35.2 W
MTOWER
FAA Chapters NONE
Monopole
Page 1 of 2
ATTN: Telecommunications Div, CS03A
Duke Energy Business Services, LLC
401 South College Street
Charlotte, NC 28202
748.6
37.8
786.4
N/A
June 2021
62
Official Copy
FCC 854R
You must comply with all applicable FCC obstruction marking and lighting requirements, as set forth in Part 17 of the
Commission’s Rules (47 C.F.R. Part 17). These rules include, but are not limited to:
• Posting the Registration Number: The Antenna Structure Registration Number must be displayed in a
conspicuous place so that it is readily visible near the base of the antenna structure. Materials used to
display the Registration Number must be weather-resistant and of sufficient size to be easily seen at the
base of the antenna structure. Exceptions exist for certain historic structures. See 47 C.F. R. 17.4(g)-(h).
• Inspecting lights and equipment: The obstruction lighting must be observed at least every 24 hours in
order to detect any outages or malfunctions. Lighting equipment, indicators, and associated devices must
be inspected at least once every three months.
• Reporting outages and malfunctions: When any top steady-burning light or a flashing light (in any
position) burns out or malfunctions, the outage must be reported to the nearest FAA Flight Service Station,
unless corrected within 30 minutes. The FAA must again be notified when the light is restored. The owner
must also maintain a log of these outages and malfunctions.
• Maintaining assigned painting: The antenna structure must be repainted as often as necessary to
maintain good visibility.
• Complying with environmental rules: If you certified that grant of this registration would not have a
significant environmental impact, you must nevertheless maintain all pertinent records and be ready to
provide documentation supporting this certification and compliance with the rules, in the event that such
information is requested by the Commission pursuant to 47 C.F.R. 1.1307(d).
• Updating information: The owner must notify the FCC of proposed modifications to this structure; of any
change in ownership; or, within 30 days of dismantlement of the structure.
Copies of the Code of Federal Regulations (which contain the FCC’s antenna structure registration rules, 47 C.F.R Part
17) are available from the Government Printing Office (GPO). To purchase CFR volumes, call (202) 512-1800. For
GPO Customer Service, call (202) 512-1803. For additional FCC information, consult the Antenna Homepage on the
internet at https://www.fcc.gov/antenna-structure-registration or call (877) 480-3201 (TTY 717-338-2824).
Page 2 of 2
June 2021
63
1 BUILDING A SMARTER ENERGY FUTURE®
9700 David Taylor Dr.
Charlotte, NC 28262
704-382-3242
August 12, 2024
James Coley, Director
Oconee County Planning and Zoning
415 S. Pine Street
Walhalla, SC 29691
Phone: (864) 638.4218
Subject: Duke Energy Bad Creek Zoning RF letter
Dear: Oconee County
Duke Energy is requesting the installation of a Telecommunications System to the existing generation facility at
Bad Creek. This project supports Duke Energy's local generation plant radio system for safe and secure
operations of the plant.
Duke Energy makes the following statements for this telecommunications system:
1. lt shall at all times and without exception, be maintained in a safe manner and in compliance
with all conditions for permits and authorizations.
2. lt shall at all times be operated and maintained in compliance with the Federal, State and local
laws, codes, ordinances, rules and regulations.
3. lt shall at all times stay within Federal Communications Commission rules and regulations for
Radio Frequency Systems, including FCC standards part 15 for unlicensed radio frequency.
Sincerely,
Patrick Bernier, PE
Senior Project Manager
64
1 BUILDING A SMARTER ENERGY FUTURE®
9700 David Taylor Dr.
Charlotte, NC 28262
704-382-3242
February 14, 2025
Oconee County
Re: Bad Creek Repeater - Communication Pole Statement of Need
Dear Oconee County:
The purpose of this letter is to convey the need for a replacement pole at the Bad Creek Repeater site, 100 Bad
Creek Rd, Salem, NC 29676. The proposed monopole, at its height and location, is critical for the continued
connectivity of the Duke Energy system. Duke Energy is in the process of replacing older, outdated, and failing
infrastructure across all jurisdictional areas, and adding infrastructure in areas that would benefit not only Duke
Energy, but also the public.
There is only one tower within 4 nautical miles (4.6 miles)(Greater than the 1,300’ radius required by the UDO)
per the FAA’s Circle Search Tool. This is Duke’s Bad Creek Self-support which was previously permitted by the
County. Its information is listed below:
Self-Support Tower (375' AGL)
35°01'22.82"N 83°01'15.16"W
Site Elevation: 2595'
Owned by Duke Energy
ASR 1321649
3,752’ Separation
Duke Energy prefers not to collocate on others towers as it reduces the security level we maintain on owned
towers. Colocation may impact the service we are able to provide internally due to no -optimal antenna heights
and ground spaces. To lower risk Duke Energy designs new towers to standards above those commonly used by
the commercial industry, leased towers may not be designed to the same standards and modifications to existing
towers may not bring them to our standards. Additionally, Duke Energy maintains its own tower fleet and can
verify their loading and history, lowering risk during weather events. Leased towers cannot be fully verified for the
proper maintenance during the life of the structure. As vital infrastructure to our customers, we place the highest
priority on the best practices, which is why colocation is not feasible unless absolutely necessary .
The existing tower on-site is End of Life. It is severely outdated in its design, life-span and structural capacity and
needs to be replaced. While Duke’s nearby self-support took on many of the functions previously provided by this
tower, it is not located to provide coverage of the nearby plant. This monopole serves to fill that gap and provide
plant radio functionality to the nearby facility. The existing outdated self-support tower will be removed once the
monopole is constructed and the plant radios are cut-over to the new monopole.
The new tower will be an important part of Duke Energy’s day-to-day operations and is part of their fundamental
physical infrastructure. This communication tower supports Duke Energy’s commitment to providing their
customers with safe, reliable, affordable, and increasingly clean energy in Oconee County, and throughout Duke
Energy’s service area.
Sincerely,
Patrick Bernier, PE
Senior Project Manager
65
August 1, 2024
Elizabeth Van Egmond Tower Engineering Professionals
Gulf Equipment Corporation 326 Tryon Road
5540 Business Parkway Theodore, AL 36582 Raleigh, NC 27603
(601) 790-9730 (919) 661-6351
Structures@tepgroup.net
Subject: Structural Analysis Report
Carrier Designation: Duke Energy Cambium Pole Project
Site Number: LA-SC-617
Site Name: Bad Creek Hydro Repeater
Engineering Firm Designation: TEP Project Number: 332714.980317
Site Data: 100 Bad Creek Rd., Salem, Oconee County, SC 29676
Latitude 35° 01' 05.48'', Longitude -83° 00' 35.25''
120 Foot (AGL) Valmont H10 Monopole - Direct Embed
Dear Elizabeth Van Egmond,
Tower Engineering Professionals is pleased to submit this “Structural Analysis Report” to determine the
structural integrity of the above-mentioned tower.
The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have
determined the stress level for the tower and foundation structure, under the following load case, to be:
LC1: Existing + Proposed + Reserved Loading Sufficient Capacity
Note: See Table 1 for the existing, proposed, and reserved loading
The analysis has been performed in accordance with the ANSI/TIA-222-H Structural Standard for Antenna
Supporting Structures, Antennas, and Small Wind Turbine Support Structures and the 2021 International Building
Code.
All modifications and equipment proposed in this report shall be installed in accordance with the appurtenances
listed in Table 1 for the determined available structural capacity to be effective.
We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional
services to you and Gulf Equipment Corporation. If you have any questions or need further assistance on this or
any other projects please give us a call.
Respectfully submitted by:
Jordan W. Shelley, P.E.
Structure Capacity Foundation Capacity
60.7% 63.3%
08/01/2024
66
July 29, 2024
120 ft Monopole Structural Analysis Bad Creek Hydro Repeater
TEP Project Number 332714.980317 Page 2
TABLE OF CONTENTS
1) INTRODUCTION
2) ANALYSIS CRITERIA
Table 1 - Existing, Proposed, and Reserved Antenna and Cable Information
3) ANALYSIS PROCEDURE
Table 2 - Documents Provided
3.1) Analysis Method
3.2) Assumptions
4) ANALYSIS RESULTS
Table 3 - Section Capacity (Summary)
Table 4 - Tower Component Stresses vs. Capacity
Table 5 - Dish Twist/Sway Results for 60 mph Service Wind Speed
4.1) Recommendations
5) APPENDIX A
tnxTower Output
6) APPENDIX B
Additional Calculations
67
July 29, 2024
120 ft Monopole Structural Analysis Bad Creek Hydro Repeater
TEP Project Number 332714.980317 Page 3
1) INTRODUCTION
The tower is a 140-foot monopole with 120-ft above grade elevation, embedded 20-feet below grade designed by
Valmont in June of 2022. All information provided to TEP was assumed to be accurate and complete.
2) ANALYSIS CRITERIA
TIA-222 Revision: ANSI/TIA-222-H
Type of Analysis: Comprehensive
Risk Category: II
Wind Speed: 107 mph (Ultimate)
Exposure Category: D
Topographic Category: 5 (Kzt = 2.117)
Ice Thickness: 1.50 in
Wind Speed with Ice: 30 mph
Seismic Design Category: C
Seismic Ss: 0.392
Seismic S1: 0.104
Service Wind Speed: 60 mph
Table 1 - Existing, Proposed, and Reserved Antenna and Cable Information
Existing/
Proposed/
Reserved
Mount
Level
(ft)
Ant
CL
(ft)
Qty Antenna Model Mount
Type
Qty
Coax
Coax
Size
Coax
Location
Owner/
Tenant
Proposed 117.0 122.5 1 Sinclair
SC329-HF2LDF-DO6-G06
(1) Site Pro
1 HS6-K 1 1-5/8 Inside Duke
Energy
Proposed 97.0 102.5 1 Sinclair
SC329-HF2LDF-DO6-G06
(1) Site Pro
1 HS6-K 1 1-5/8 Inside Duke
Energy
3) ANALYSIS PROCEDURE
Table 2 - Documents Provided
Document Remarks Source
Tower Design Valmont, dated June 22, 2022
Dwg. No. 307137Z
Duke
Energy
Geotechnical Report S&ME, dated July 24, 2024
Project No. 23600531
Duke
Energy
Construction Drawings SMW Engineering Group, LLC., dated May 17, 2024
Job No. 21-2705.1
Duke
Energy
Correspondence Correspondence in reference to the existing, proposed, and reserved
loading.
Gulf
Equipment
Corporation
3.1) Analysis Method
tnxTower (version 8.2.4.3), a commercially available analysis software package, was used to create a
three-dimensional model of the tower and calculate member stresses for various loading cases.
Selected output from the analysis is included in Appendix A.
68
July 29, 2024
120 ft Monopole Structural Analysis Bad Creek Hydro Repeater
TEP Project Number 332714.980317 Page 4
3.2) Analysis Assumptions
1) The tower and foundation were built and maintained in accordance with the manufacturer’s
specification.
2) The configuration of existing antennas, transmission cables, mounts and other appurtenances
are as specified in the tower mapping report by TEP.
3) Unless specified by the client or tower mapping, the location of the existing and proposed coax is
assumed by TEP and listed in Table 1.
4) All tower components are in sufficient condition to carry their full design capacity.
5) Serviceability with respect to antenna twist, tilt, roll, or lateral translation, is not checked and is
left to the carrier or tower owner to ensure conformance.
6) All antenna mounts and mounting hardware are structurally sufficient to carry the full design
capacity requirements of appurtenance wind area and weight as provided by the original
manufacturer specifications. It is the carrier’s responsibility to ensure compliance to the structural
limitations of the existing and/or proposed antenna mounts. TEP did not analyze antennas
supporting mounts as part of this structural analysis report.
This analysis may be affected if any assumptions are not valid or have been made in error. Tower
Engineering Professionals should be notified to determine the effect on the structural integrity of the
tower.
4) ANALYSIS RESULTS
Table 3 - Section Capacity (Summary)
Section
No. Elevation (ft) Component Type Size Critical
Element P (lb) øPallow (lb) %
Capacity
Pass /
Fail
L1 120 - 67.0833 Pole TP26.08x16.51x0.219 1 -2881.790 1087548.000 24.9 Pass
L2 67.0833 -
31.6667
Pole TP32.05x24.888x0.25 2 -6444.020 1529177.875 44.2 Pass
L3 31.6667 - 0 Pole TP37.272x30.676x0.281 3 -11852.800 2055920.875 60.7 Pass
Summary
Pole (L3) 60.7 Pass
RATING = 60.7 Pass
Table 4 - Tower Component Stresses vs. Capacity
Notes Component Elevation
(ft) % Capacity Pass / Fail
1,2 Direct Embed Soil Interaction - 25.9 Pass
1,2 Direct Embed Structural - 63.3 Pass
Structure Rating (max from all components) = 63.3%
Notes:
1) Rating per TIA-222-H, Section 15.5
2) See additional documentation in “Appendix B - Additional Calculations” for calculations supporting the % capacity listed.
Table 5 - Dish Twist/Sway Results for 60 mph Service Wind Speed
Elevation
(ft) Dish Model
Beam Deflection
Deflection (in) Tilt (deg) Twist (deg)
- - - - -
69
July 29, 2024
120 ft Monopole Structural Analysis Bad Creek Hydro Repeater
TEP Project Number 332714.980317 Page 5
4.1) Recommendations
1) If the load differs from that described in Table 1 of this report or the provisions of this analysis are
found to be invalid, another structural analysis should be performed.
2) The tower and its foundation have sufficient capacity to carry the proposed load configuration.
No modifications are required at this time.
3) Tower is to be directly embedded to a depth of 20-ft below grade
70
July 29, 2024
120 ft Monopole Structural Analysis Bad Creek Hydro Repeater
TEP Project Number 332714.980317 Page 6
APPENDIX A
TNX TOWER OUTPUT
71
Tower Engineering Professionals
Tower Engineering Professionals
326 Tryon Road
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Job:
BAD CREEK HYDRO REPEATER
Project: TEP# 332714.980317
Client: Duke Energy Drawn by: RAD App'd:
Code: TIA-222-H Date: 07/29/24 Scale: NTS
Path:
C:\00. Rahul\Rahul Non-Crown\SA sites\02. SST\Gulf Equipment Corp dba Gulf Services\01. 332714\P-403696_L-980317__Bad Creek Repeater_Structural Analysis\TNX\BAD CREEK HYDRO REPEATER.eri
Dwg No. E-1
120.0 ft
67.1 ft
31.7 ft
0.0 ft
REACTIONS - 107 mph WIND
TORQUE 688 lb-ft
16936 lb
SHEAR
965203 lb-ft
MOMENT
11864 lb
AXIAL
30 mph WIND - 1.500 in ICE
TORQUE 183 lb-ft
2261 lb
SHEAR
142613 lb-ft
MOMENT
23060 lb
AXIAL
ARE FACTORED
ALL REACTIONS
Section 123
Length (ft) 52.91739.58336.500
Number of Sides 121212
Thickness (in) 0.2190.2500.281
Socket Length (ft) 4.1674.833
Top Dia (in) 16.51024.88830.676
Bot Dia (in) 26.08032.05037.272
Grade A572-65
Weight (lb) 2676.23059.83786.49522.4
5/8" x 10' LROD 120 Side Arm Mount [SO 302-1] 117 SC329-HF2LDF(D03-G06) 117 Side Arm Mount [SO 302-1] 97 SC329-HF2LDF(D03-G06) 97DESIGNED APPURTENANCE LOADING
TYPE TYPEELEVATION ELEVATION
5/8" x 10' LROD 120
Side Arm Mount [SO 302-1] 117
SC329-HF2LDF(D03-G06) 117
Side Arm Mount [SO 302-1] 97
SC329-HF2LDF(D03-G06) 97
MATERIAL STRENGTH
GRADE GRADEFy FyFu Fu
A572-65 65 ksi 80 ksi
TOWER DESIGN NOTES
1. Tower is located in Oconee County, South Carolina.
2. Tower designed for Exposure D to the TIA-222-H Standard.
3. Tower designed for a 107 mph basic wind in accordance with the TIA-222-H Standard.
4. Tower is also designed for a 30 mph basic wind with 1.50 in ice. Ice is considered to
increase in thickness with height.
5. Deflections are based upon a 60 mph wind.
6. Tower Risk Category II.
7. Topographic Category 5 with Crest Height of 409.000 ft
8. TOWER RATING: 60.7%
72
ttnnxxTToowweerr
Job
BAD CREEK HYDRO REPEATER
Page
1 of 8
Tower Engineering
Professionals
326 Tryon Road
Project
TEP# 332714.980317
Date
12:14:10 07/29/24
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Client
Duke Energy
Designed by
RAD
Tower Input Data
The tower is a monopole.
This tower is designed using the TIA-222-H standard.
The following design criteria apply:
Tower is located in Oconee County, South Carolina.
Tower base elevation above sea level: 2457.630 ft.
Basic wind speed of 107 mph.
Risk Category II.
Exposure Category D.
Crest Height: 409.000 ft.
Rigorous Topographic Factor Procedure for wind speed-up calculations is used.
Topographic Feature: Hill.
Slope Distance L: 1906.000 ft.
Distance from Crest x: 0.000 ft.
Horizontal Distance Downwind: No.
Nominal ice thickness of 1.500 in.
Ice thickness is considered to increase with height.
Ice density of 56 pcf.
A wind speed of 30 mph is used in combination with ice.
Temperature drop of 50 °F.
Deflections calculated using a wind speed of 60 mph.
A non-linear (P-delta) analysis was used.
Pressures are calculated at each section.
Stress ratio used in pole design is 1.05.
Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered.
Options
Consider Moments - Legs Assume Legs Pinned Calculate Redundant Bracing Forces
Consider Moments - Horizontals √ Assume Rigid Index Plate Ignore Redundant Members in FEA
Consider Moments - Diagonals √ Use Clear Spans For Wind Area SR Leg Bolts Resist Compression
Use Moment Magnification Use Clear Spans For KL/r All Leg Panels Have Same Allowable
Use Code Stress Ratios Retension Guys To Initial Tension Offset Girt At Foundation
√ Use Code Safety Factors - Guys √ Bypass Mast Stability Checks √ Consider Feed Line Torque
Escalate Ice √ Use Azimuth Dish Coefficients Include Angle Block Shear Check
Always Use Max Kz √ Project Wind Area of Appurtenances Use TIA-222-H Bracing Resist. Exemption
Use Special Wind Profile √ Alternative Appurt. EPA Calculation Use TIA-222-H Tension Splice Exemption
Include Bolts In Member Capacity Autocalc Torque Arm Areas Poles
Leg Bolts Are At Top Of Section Add IBC .6D+W Combination √ Include Shear-Torsion Interaction
Secondary Horizontal Braces Leg √ Sort Capacity Reports By Component Always Use Sub-Critical Flow
Use Diamond Inner Bracing (4 Sided) Triangulate Diamond Inner Bracing Use Top Mounted Sockets
SR Members Have Cut Ends Treat Feed Line Bundles As Cylinder √ Pole Without Linear Attachments
SR Members Are Concentric Ignore KL/ry For 60 Deg. Angle Legs Pole With Shroud Or No Appurtenances
Distribute Leg Loads As Uniform Use ASCE 10 X-Brace Ly Rules Outside and Inside Corner Radii Are Known
ttnnxxTToowweerr
Job
BAD CREEK HYDRO REPEATER
Page
2 of 8
Tower Engineering
Professionals
326 Tryon Road
Project
TEP# 332714.980317
Date
12:14:10 07/29/24
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Client
Duke Energy
Designed by
RAD
Tapered Pole Section Geometry
Section Elevation
ft
Section
Length
ft
Splice
Length
ft
Number
of
Sides
Top
Diameter
in
Bottom
Diameter
in
Wall
Thickness
in
Bend
Radius
in
Pole Grade
L1 120.000-67.083 52.917 4.167 12 16.510 26.080 0.219 0.876 A572-65
(65 ksi)
L2 67.083-31.667 39.583 4.833 12 24.888 32.050 0.250 1.000 A572-65
(65 ksi)
L3 31.667-0.000 36.500 12 30.676 37.272 0.281 1.124 A572-65
(65 ksi)
Tapered Pole Properties
Section Tip Dia.
in
Area
in2
I
in4
r
in
C
in
I/C
in3
J
in4
It/Q
in2
w
in
w/t
L1 17.015 11.488 389.161 5.832 8.552 45.504 788.545 5.654 3.838 17.524
26.923 18.237 1556.761 9.258 13.509 115.235 3154.419 8.976 6.403 29.235
L2 26.459 19.834 1536.817 8.821 12.892 119.205 3114.007 9.762 6.000 24
33.092 25.599 3304.176 11.384 16.602 199.024 6695.157 12.599 7.919 31.678
L3 32.563 27.502 3242.911 10.881 15.890 204.086 6571.016 13.535 7.468 26.576
38.488 33.470 5845.840 13.243 19.307 302.783 11845.257 16.473 9.236 32.868
Tower
Elevation
ft
Gusset
Area
(per face)
ft2
Gusset
Thickness
in
Gusset Grade Adjust. Factor
Af
Adjust.
Factor
Ar
Weight Mult.
Double Angle
Stitch Bolt
Spacing
Diagonals
in
Double Angle
Stitch Bolt
Spacing
Horizontals
in
Double Angle
Stitch Bolt
Spacing
Redundants
in
L1
120.000-67.08
3
1 1 1
L2
67.083-31.667
1 1 1
L3
31.667-0.000
1 1 1
Feed Line/Linear Appurtenances - Entered As Round Or Flat
Description Sector Exclude
From
Torque
Calculation
Component
Type
Placement
ft
Total
Number
Number
Per Row
Start/End
Position
Width or
Diameter
in
Perimeter
in
Weight
plf
Safety Line 3/8 C No Surface Ar
(CaAa)
120.000 -
10.000
1 1 0.000
0.000
0.375 0.220
Step Pegs (5/8'' SR) 7-in.
w/30'' step
C No Surface Ar
(CaAa)
120.000 -
10.000
1 1 0.000
0.000
0.350 0.487
*
Feed Line/Linear Appurtenances - Entered As Area
73
ttnnxxTToowweerr
Job
BAD CREEK HYDRO REPEATER
Page
3 of 8
Tower Engineering
Professionals
326 Tryon Road
Project
TEP# 332714.980317
Date
12:14:10 07/29/24
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Client
Duke Energy
Designed by
RAD
Description Face
or
Leg
Allow
Shield
Exclude
From
Torque
Calculation
Component
Type
Placement
ft
Total
Number
C AAA
ft2/ft
Weight
plf
****
EC7-50A( 1 5/8'') C No No Inside Pole 117.000 - 5.000 1 No Ice
1/2'' Ice
1'' Ice
2'' Ice
0.000
0.000
0.000
0.000
0.760
0.760
0.760
0.760
***
EC7-50A( 1 5/8'') C No No Inside Pole 97.000 - 5.000 1 No Ice
1/2'' Ice
1'' Ice
2'' Ice
0.000
0.000
0.000
0.000
0.760
0.760
0.760
0.760
*
Feed Line/Linear Appurtenances Section Areas
Tower
Section
Tower
Elevation
ft
Face A R
ft2
AF
ft2
CAAA
In Face
ft2
CAAA
Out Face
ft2
Weight
lb
L1 120.000-67.083 A
B
C
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3.836
0.000
0.000
0.000
0.000
0.000
98.085
L2 67.083-31.667 A
B
C
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.568
0.000
0.000
0.000
0.000
0.000
78.873
L3 31.667-0.000 A
B
C
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.571
0.000
0.000
0.000
0.000
0.000
55.852
Feed Line/Linear Appurtenances Section Areas - With Ice
Tower
Section
Tower
Elevation
ft
Face
or
Leg
Ice
Thickness
in
AR
ft2
AF
ft2
CAAA
In Face
ft2
CAAA
Out Face
ft2
Weight
lb
L1 120.000-67.083 A
B
C
2.038 0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
46.969
0.000
0.000
0.000
0.000
0.000
730.496
L2 67.083-31.667 A
B
C
1.980 0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
31.436
0.000
0.000
0.000
0.000
0.000
502.139
L3 31.667-0.000 A
B
C
1.819 0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
18.728
0.000
0.000
0.000
0.000
0.000
301.331
Feed Line Center of Pressure
Section Elevation
ft
CPX
in
CPZ
in
CPX
Ice
in
CPZ
Ice
in
ttnnxxTToowweerr
Job
BAD CREEK HYDRO REPEATER
Page
4 of 8
Tower Engineering
Professionals
326 Tryon Road
Project
TEP# 332714.980317
Date
12:14:10 07/29/24
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Client
Duke Energy
Designed by
RAD
Section Elevation
ft
CPX
in
CPZ
in
CPX
Ice
in
CPZ
Ice
in
L1 120.000-67.083 0.000 0.482 0.000 2.752
L2 67.083-31.667 0.000 0.485 0.000 3.042
L3 31.667-0.000 0.000 0.327 0.000 2.222
Note: For pole sections, center of pressure calculations do not consider feed line shielding.
Shielding Factor Ka
Tower
Section
Feed Line
Record No.
Description Feed Line
Segment Elev.
Ka
No Ice
Ka
Ice
L1 1 Safety Line 3/8 67.08 - 120.00 1.0000 1.0000
L1 2 Step Pegs (5/8" SR) 7-in.
w/30" step
67.08 - 120.00 1.0000 1.0000
L2 1 Safety Line 3/8 31.67 - 67.08 1.0000 1.0000
L2 2 Step Pegs (5/8" SR) 7-in.
w/30" step
31.67 - 67.08 1.0000 1.0000
L3 1 Safety Line 3/8 10.00 - 31.67 1.0000 1.0000
L3 2 Step Pegs (5/8" SR) 7-in.
w/30" step
10.00 - 31.67 1.0000 1.0000
Discrete Tower Loads
Description Face
or
Leg
Offset
Type
Offsets:
Horz
Lateral
Vert
ft
ft
ft
Azimuth
Adjustment
°
Placement
ft
C
AAA
Front
ft
2
CAAA
Side
ft
2
Weight
lb
5/8'' x 10' LROD C From Leg 0.000
0.000
5.000
0.000 120.000 No Ice
1/2'' Ice
1'' Ice
2'' Ice
0.625
1.639
2.669
4.779
0.625
1.639
2.669
4.779
4.000
10.939
24.204
70.319
**117**
Side Arm Mount [SO 302-1] B From Leg 0.500
0.000
0.000
0.000 117.000 No Ice
1/2'' Ice
1'' Ice
2'' Ice
0.810
1.300
1.810
2.910
3.310
5.000
6.800
10.990
55.000
82.940
122.050
233.110
SC329-HF2LDF(D03-G06) B From Leg 1.500
0.000
5.500
0.000 117.000 No Ice
1/2'' Ice
1'' Ice
2'' Ice
2.308
3.487
4.683
6.960
2.308
3.487
4.683
6.960
8.900
26.755
52.017
125.372
***97***
Side Arm Mount [SO 302-1] C From Leg 0.500
0.000
0.000
0.000 97.000 No Ice
1/2'' Ice
1'' Ice
2'' Ice
0.810
1.300
1.810
2.910
3.310
5.000
6.800
10.990
55.000
82.940
122.050
233.110
74
ttnnxxTToowweerr
Job
BAD CREEK HYDRO REPEATER
Page
5 of 8
Tower Engineering
Professionals
326 Tryon Road
Project
TEP# 332714.980317
Date
12:14:10 07/29/24
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Client
Duke Energy
Designed by
RAD
Description Face
or
Leg
Offset
Type
Offsets:
Horz
Lateral
Vert
ft
ft
ft
Azimuth
Adjustment
°
Placement
ft
C AAA
Front
ft
2
CAAA
Side
ft
2
Weight
lb
SC329-HF2LDF(D03-G06) C From Leg 1.500
0.000
5.500
0.000 97.000 No Ice
1/2'' Ice
1'' Ice
2'' Ice
2.308
3.487
4.683
6.960
2.308
3.487
4.683
6.960
8.900
26.755
52.017
125.372
**
Load Combinations
Comb.
No.
Description
1 Dead Only
2 1.2 Dead+1.0 Wind 0 deg - No Ice
3 0.9 Dead+1.0 Wind 0 deg - No Ice
4 1.2 Dead+1.0 Wind 30 deg - No Ice
5 0.9 Dead+1.0 Wind 30 deg - No Ice
6 1.2 Dead+1.0 Wind 60 deg - No Ice
7 0.9 Dead+1.0 Wind 60 deg - No Ice
8 1.2 Dead+1.0 Wind 90 deg - No Ice
9 0.9 Dead+1.0 Wind 90 deg - No Ice
10 1.2 Dead+1.0 Wind 120 deg - No Ice
11 0.9 Dead+1.0 Wind 120 deg - No Ice
12 1.2 Dead+1.0 Wind 150 deg - No Ice
13 0.9 Dead+1.0 Wind 150 deg - No Ice
14 1.2 Dead+1.0 Wind 180 deg - No Ice
15 0.9 Dead+1.0 Wind 180 deg - No Ice
16 1.2 Dead+1.0 Wind 210 deg - No Ice
17 0.9 Dead+1.0 Wind 210 deg - No Ice
18 1.2 Dead+1.0 Wind 240 deg - No Ice
19 0.9 Dead+1.0 Wind 240 deg - No Ice
20 1.2 Dead+1.0 Wind 270 deg - No Ice
21 0.9 Dead+1.0 Wind 270 deg - No Ice
22 1.2 Dead+1.0 Wind 300 deg - No Ice
23 0.9 Dead+1.0 Wind 300 deg - No Ice
24 1.2 Dead+1.0 Wind 330 deg - No Ice
25 0.9 Dead+1.0 Wind 330 deg - No Ice
26 1.2 Dead+1.0 Ice+1.0 Temp
27 1.2 Dead+1.0 Wind 0 deg+1.0 Ice+1.0 Temp
28 1.2 Dead+1.0 Wind 30 deg+1.0 Ice+1.0 Temp
29 1.2 Dead+1.0 Wind 60 deg+1.0 Ice+1.0 Temp
30 1.2 Dead+1.0 Wind 90 deg+1.0 Ice+1.0 Temp
31 1.2 Dead+1.0 Wind 120 deg+1.0 Ice+1.0 Temp
32 1.2 Dead+1.0 Wind 150 deg+1.0 Ice+1.0 Temp
33 1.2 Dead+1.0 Wind 180 deg+1.0 Ice+1.0 Temp
34 1.2 Dead+1.0 Wind 210 deg+1.0 Ice+1.0 Temp
35 1.2 Dead+1.0 Wind 240 deg+1.0 Ice+1.0 Temp
36 1.2 Dead+1.0 Wind 270 deg+1.0 Ice+1.0 Temp
37 1.2 Dead+1.0 Wind 300 deg+1.0 Ice+1.0 Temp
38 1.2 Dead+1.0 Wind 330 deg+1.0 Ice+1.0 Temp
39 Dead+Wind 0 deg - Service
40 Dead+Wind 30 deg - Service
41 Dead+Wind 60 deg - Service
ttnnxxTToowweerr
Job
BAD CREEK HYDRO REPEATER
Page
6 of 8
Tower Engineering
Professionals
326 Tryon Road
Project
TEP# 332714.980317
Date
12:14:10 07/29/24
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Client
Duke Energy
Designed by
RAD
Comb.
No.
Description
42 Dead+Wind 90 deg - Service
43 Dead+Wind 120 deg - Service
44 Dead+Wind 150 deg - Service
45 Dead+Wind 180 deg - Service
46 Dead+Wind 210 deg - Service
47 Dead+Wind 240 deg - Service
48 Dead+Wind 270 deg - Service
49 Dead+Wind 300 deg - Service
50 Dead+Wind 330 deg - Service
Maximum Tower Deflections - Service Wind
Section
No.
Elevation
ft
Horz.
Deflection
in
Gov.
Load
Comb.
Tilt
°
Twist
°
L1 120 - 67.0833 15.276 45 0.954 0.005
L2 71.25 - 31.6667 6.170 45 0.756 0.002
L3 36.5 - 0 1.748 45 0.422 0.001
Critical Deflections and Radius of Curvature - Service Wind
Elevation
ft
Appurtenance Gov.
Load
Comb.
Deflection
in
Tilt
°
Twist
°
Radius of
Curvature
ft
120.000 5/8'' x 10' LROD 45 15.276 0.954 0.005 76738
117.000 Side Arm Mount [SO 302-1] 45 14.679 0.947 0.004 76738
97.000 Side Arm Mount [SO 302-1] 45 10.759 0.888 0.003 16682
Maximum Tower Deflections - Design Wind
Section
No.
Elevation
ft
Horz.
Deflection
in
Gov.
Load
Comb.
Tilt
°
Twist
°
L1 120 - 67.0833 54.377 14 3.396 0.017
L2 71.25 - 31.6667 21.971 14 2.692 0.006
L3 36.5 - 0 6.226 14 1.503 0.002
Critical Deflections and Radius of Curvature - Design Wind
Elevation
ft
Appurtenance Gov.
Load
Comb.
Deflection
in
Tilt
°
Twist
°
Radius of
Curvature
ft
120.000 5/8'' x 10' LROD 14 54.377 3.396 0.017 21728
117.000 Side Arm Mount [SO 302-1] 14 52.251 3.369 0.017 21728
97.000 Side Arm Mount [SO 302-1] 14 38.303 3.163 0.011 4721
75
ttnnxxTToowweerr
Job
BAD CREEK HYDRO REPEATER
Page
7 of 8
Tower Engineering
Professionals
326 Tryon Road
Project
TEP# 332714.980317
Date
12:14:10 07/29/24
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Client
Duke Energy
Designed by
RAD
Compression Checks
Pole Design Data
Section
No.
Elevation
ft
Size
L
ft
Lu
ft
Kl/r
A
in2
Pu
lb
φ Pn
lb
Ratio
Pu
φ Pn
L1 120 - 67.0833
(1)
TP26.08x16.51x0.219 52.917 0.000 0.0 17.705 -2881.790 1035760.000 0.003
L2 67.0833 -
31.6667 (2)
TP32.05x24.888x0.25 39.583 0.000 0.0 24.895 -6444.020 1456360.000 0.004
L3 31.6667 - 0 (3) TP37.272x30.676x0.281 36.500 0.000 0.0 33.471 -11852.800 1958020.000 0.006
Pole Bending Design Data
Section
No.
Elevation
ft
Size
Mux
lb-ft
φ Mnx
lb-ft
Ratio
Mux
φ Mnx
Muy
lb-ft
φ Mny
lb-ft
Ratio
Muy
φ Mny
L1 120 - 67.0833
(1)
TP26.08x16.51x0.219 152465.833 589428.333 0.259 0.000 589428.333 0.000
L2 67.0833 -
31.6667 (2)
TP32.05x24.888x0.25 452186.667 984125.000 0.459 0.000 984125.000 0.000
L3 31.6667 - 0 (3) TP37.272x30.676x0.281 965200.000 1530700.000 0.631 0.000 1530700.000 0.000
Pole Shear Design Data
Section
No.
Elevation
ft
Size
Actual
Vu
lb
φ Vn
lb
Ratio
Vu
φ Vn
Actual
Tu
lb-ft
φ Tn
lb-ft
Ratio
Tu
φ Tn
L1 120 - 67.0833
(1)
TP26.08x16.51x0.219 6165.890 304985.000 0.020 84.508 686250.000 0.000
L2 67.0833 -
31.6667 (2)
TP32.05x24.888x0.25 11201.100 432565.000 0.026 84.455 1188525.000 0.000
L3 31.6667 - 0 (3) TP37.272x30.676x0.281 16944.400 582623.000 0.029 84.399 1911341.667 0.000
Pole Interaction Design Data
Section
No.
Elevation
ft
Ratio
Pu
φ Pn
Ratio
Mux
φ Mnx
Ratio
Muy
φ Mny
Ratio
Vu
φ Vn
Ratio
Tu
φ Tn
Comb.
Stress
Ratio
Allow.
Stress
Ratio
Criteria
L1 120 - 67.0833
(1)
0.003 0.259 0.000 0.020 0.000 0.262 1.050
L2 67.0833 -
31.6667 (2)
0.004 0.459 0.000 0.026 0.000 0.465 1.050
ttnnxxTToowweerr
Job
BAD CREEK HYDRO REPEATER
Page
8 of 8
Tower Engineering
Professionals
326 Tryon Road
Project
TEP# 332714.980317
Date
12:14:10 07/29/24
Raleigh, NC 27603
Phone: (919) 661-6351
FAX: -
Client
Duke Energy
Designed by
RAD
Section
No.
Elevation
ft
Ratio
Pu
φ Pn
Ratio
Mux
φ Mnx
Ratio
Muy
φ Mny
Ratio
Vu
φ Vn
Ratio
Tu
φ Tn
Comb.
Stress
Ratio
Allow.
Stress
Ratio
Criteria
L3 31.6667 - 0 (3) 0.006 0.631 0.000 0.029 0.000 0.637 1.050
Section Capacity Table
Section
No.
Elevation
ft
Component
Type
Size Critical
Element
P
lb
øPallow
lb
%
Capacity
Pass
Fail
L1 120 - 67.0833 Pole TP26.08x16.51x0.219 1 -2881.790 1087548.00
0
24.9 Pass
L2 67.0833 -
31.6667
Pole TP32.05x24.888x0.25 2 -6444.020 1529177.87
5
44.2 Pass
L3 31.6667 - 0 Pole TP37.272x30.676x0.281 3 -11852.800 2055920.87
5
60.7 Pass
Summary
Pole (L3) 60.7 Pass
RATING = 60.7 Pass
Program Version 8.2.4.3
76
July 29, 2024
120 ft Monopole Structural Analysis Bad Creek Hydro Repeater
TEP Project Number 332714.980317 Page 7
APPENDIX B
ADDITIONAL CALCULATIONS
77
Report File:
TIA-222 Revison:
Tower Type: Check Pier Capacity only at location of Max Moment? No
Location:
Soil Lateral Check Compression Uplift
Comp. Uplift 6.59 -
965.203 4.89 -
11.864 1051.76 -
16.936 25.9% -
Soil Vertical Check Compression Uplift Go to Soil Calculations
544.86 -
ksi 562.38 -
60 ksi 0.11 -
40 ksi 1107.24 -
11.97 -
1.0% -
20 ft Embedded Pole Interaction Compression Uplift
0 ft 5.40 -
1047.35 -
5683.25 -
3.257 ft 63.3% -
27 Reinforced Concrete Shear Compression Uplift
- -
3 in - -
4 - -
in - -
in
*Rating per TIA-222-H Section 15.5
N/A # of Layers 4
121
FALSE 1 0 3 3 130 150 0 0 0.000 0.000 0.00 0.00
FALSE 2 3 8.5 5.5 130 150 36 0.000 0.000 2.00 2.00
FALSE 3 8.5 16.5 8 165 150 5 2.321 2.321 4.00 4.00
FALSE 4 16.5 20 3.5 165 150 6 2.700 2.700 8.00 8.00 90
Cohesionless
Cohesive
Cohesive
Soil Profile
Groundwater Depth
SPT Blow
Count
Ult. Gross
Bearing
Capacity
(ksf)
Ultimate Skin
Friction Uplift
Override (ksf)
Ultimate Skin
Friction Comp
Override
(ksf)
Calculated
Ultimate Skin
Friction Uplift
(ksf)
Calculated
Ultimate Skin
Friction Comp
(ksf)
Angle of
Friction
(degrees)
γconcrete
(pcf)
γsoil
(pcf)
Cohesion
(ksf)Bottom (ft) Thickness
(ft)Layer Soil TypeTop
(ft)
Cohesionless
Rebar Quantity
Structural Foundation Rating*Rebar Size 63.3%
Rebar Cage Diameter Soil Interaction Rating* 25.9%
Rebar 2, Fy
Override
(ksi)
Rebar 3, Fy
Override
(ksi)
Material Properties Skin Friction (kips)
Concrete Strength, f'c: End Bearing (kips)
Rebar Strength, Fy: Weight of Concrete (kips)
Tie Yield Strength, Fyt: Total Capacity (kips)
Axial (kips)
Pier Design Data Rating*
Depth
Ext. Above Grade Critical Depth (ft from TOC)
Critical Moment (kip-ft)Pier Section 1
From 0' below grade to 20' below grade Critical Moment Capacity
Pier Diameter Rating*
Rebar Quantity
Rebar Size Critical Depth (ft from TOC)
Clear Cover to Ties Critical Shear (kip)
Critical Shear CapacityTie Size
Rating*Tie Spacing
Embedded Pole Foundation
Site# : LA-SC-617
Site Name: BAD CREEK HYDRO REPEATER
TEP #: 332714.980317
H
Shear Force (kips) Rating*
N/A
Check Limitation
N/A
N/A
N/A
Design Options
Input Effective Depths (else Actual):
Apply TIA-222-H Section 15.5:Monopole
Analysis Results
Applied Loads
Dv=0 (ft from TOC)
Soil Safety FactorMoment (kip-ft)
Max Moment (kip-ft)Axial Force (kips)
Consider non-tapered moment capacity:
Rebar & Pier Options
Embedded Pole Inputs
Belled Pier Inputs
Version 6.1.2
78
Site # : LA-SC-617
Site Name: BAD CREEK HYDRO REPEATER
TEP #: 332714.980317
Encased in Concrete: No
Number of Sides: 12
Yield Strength (ksi): 65
Thickness (in): 0.281
Bend Radius (in): 0.4215
Taper Factor (in/ft): 0.1809
Depth from Grade (ft): 3.01
Diameter (in): 37.82
Axial Demand (kip): 12.14
Axial Capacity (kip): 2043.07
Rating*: 0.6%
Depth from Grade (ft): 5.42
Diameter (in): 38.25
Flexural Demand (kip-ft): 1047.49
Flexural Capacity (kip-ft): 1588.82
Rating*: 62.8%
Depth from Grade (ft): 5.40
Diameter (in): 38.25
Axial Demand (kip): 11.90
Axial Capacity (kip): 2052.69
Flexural Demand (kip-ft): 1047.35
Flexural Capacity (kip-ft): 1588.60
Version Rating*: 63.3% Structural Rating: 63.3%
Version 6.1.2
Maximum Interaction Rating
Maximum Flexural Rating
Maximum Axial Rating
SUPPLEMENTAL EMBEDDED POLE REPORT
Embedded Pole Properties
79
80