RecordWell Data

Pickens County Council Meeting — Agenda Packet

Pickens County · Pickens County · Pickens County Council · meeting of May 1, 2023 · Agenda packets

Open the original document More from Pickens County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

222 MCDANIEL AVENUE, B-1 ∙ PICKENS, SC 29671 ∙ 864.898.5856 ∙ WWW.CO.PICKENS.SC.US COUNCIL MEMBERS CHRIS BOWERS, CHAIRMAN ROY COSTNER, VICE CHAIRMAN ALEX SAITTA, VICE CHAIR PRO-TEM C. CLAIBORNE LINVILL CHRIS LOLLIS HENRY WILSON COUNTY ADMINISTRATOR KEN ROPER CLERK TO COUNCIL MEAGAN NATIONS PICKENS COUNTY COUNCIL MEETING Monday, May 1, 2023 6:30 PM Auditorium, County Administration Facility 222 McDaniel Avenue, Pickens SC 29671 All meetings of Pickens County Council are held in accordance with the South Carolina Freedom of Information Act, Section 30-4-70, et seq. of the Code of Laws of South Carolina, 1976, as amended, as well as the Organizational Rules for Pickens County Council. WELCOME AND CALL TO ORDER: Chairman Chris Bowers 1. INVOCATION AND PLEDGE OF ALLEGIANCE: Chairman Chris Bowers 2. PUBLIC FORUM. County Council hosts a public forum at its first regularly scheduled meeting of each month. Individuals wishing to speak during Public Forum should contact the Clerk to Council in advance of the meeting. Comments are limited to 3 minutes per participant and 30 minutes in total. 3. APPROVAL OF MINUTES:  April 3, 2023  April 17, 2023 – Special-Called Meeting  April 24, 2023 – Budget Work Session  April 26, 2023 – Special-Called Meeting 4. ADMINISTRATOR’S REPORT Updates from the County Administrator on operations, personnel, or other day-to-day matters. 5. COMMITTEE REPORTS a) Committee of the Whole – April 17, 2023 1) Log No. 141 – UDSO: Motion to Pull from Committee:  SECOND READING OF AN ORDINANCE ADDRESSING GROWTH ISSUES IN PICKENS COUNTY BY AMENDING THE UNIFIED DEVELOPMENT STANDARDS ORDINANCE SO AS TO PROVIDE FOR LIMITATIONS ON SUBDIVISIONS, MINIMIZE PRESSURE ON EXISTING ROADWAYS, INCREASE OPEN SPACES, REGULATE SUBSTANDARD HOUSING, AS WELL AS INCREASE PROTECTION OF TREE CANOPIES, NATURAL SPACES, AND WATERWAYS, then recommit to the Committee of the Whole. 222 MCDANIEL AVENUE, B-1 ∙ PICKENS, SC 29671 ∙ 864.898.5856 ∙ WWW.CO.PICKENS.SC.US 6. COUNCIL CORRESPONDENCE Notification of future meeting dates and/or changes as well as community dates of interest. 7. MOTION PERIOD AND NEW BUSINESS Matters can be added to the agenda by appropriate motion, second, and unanimous vote of council. 8. ORDINANCES FOR FIRST READING AND/OR RESOLUTIONS: a) FIRST READING IN TITLE ONLY OF AN ORDINANCE AUTHORIZING AND APPROVING (1) THE DEVELOPMENT OF A JOINT COUNTY INDUSTRIAL AND BUSINESS PARK PURSUANT TO SECTION 4-1-170 OF THE CODE OF LAWS OF SOUTH CAROLINA 1976, AS AMENDED, IN CONJUNCTION WITH OCONEE COUNTY (THE “PARK”), SUCH PARK TO BE GEOGRAPHICALLY LOCATED IN OCONEE COUNTY; (2) THE EXECUTION AND DELIVERY OF A WRITTEN PARK AGREEMENT WITH OCONEE COUNTY AS TO THE REQUIREMENT OF PAYMENTS OF FEE IN LIEU OF AD VALOREM TAXES WITH RESPECT TO PARK PROPERTY AND THE SHARING OF THE REVENUES AND EXPENSES OF THE PARK; (3) THE DISTRIBUTION OF REVENUES FROM THE PARK WITHIN PICKENS COUNTY; AND (4) OTHER MATTERS RELATED THERETO. b) CONSIDERATION OF A RESOLUTION 2023-13 TO RECOGNIZE MAY 2023 AS STROKE AWARENESS MONTH IN PICKENS COUNTY. c) CONSIDERATION OF A RESOLUTION 2023-14 PROCLAIMING THE WEEK OF MAY 21-27, 2023, AS EMERGENCY MEDICAL SERVICES WEEK IN PICKENS COUNTY. d) CONSIDERATION OF A RESOLUTION 2023-15 PROCLAIMING MAY 15 AS PEACE OFFICERS MEMORIAL DAY IN PICKENS COUNTY. e) CONSIDERATION OF A RESOLUTION 2023-16 TO RECOGNIZE MAY 21-27, 2023 AS NATIONAL PUBLIC WORKS WEEK IN PICKENS COUNTY. f) CONSIDERATION OF A RESOLUTION 2023-17 RECOGNIZING MAY 2023 AS MENTAL HEALTH MONTH IN PICKENS COUNTY. g) CONSIDERATION OF A RESOLUTION 2023-18 PROCLAIMING THE WEEK OF MAY 20-26, 2023 AS SAFE BOATING WEEK IN PICKENS COUNTY. h) CONSIDERATION OF A RESOLUTION 2023-19 RECOGNIZING MAY 2023 AS NURSE’S MONTH IN PICKENS COUNTY. i) CONSIDERATION OF A RESOLUTION 2023-20 RECOGNIZING MAY 8-12, 2023 AS TEACHER APPRECIATION WEEK IN PICKENS COUNTY. j) CONSIDERATION OF A PROCLAMATION 2023-21 RECOGNIZING MAY 12, 2023 AS “LETTER CARRIERS’ STAMP OUT HUNGER FOOD DRIVE DAY” IN PICKENS COUNTY 9. ORDINANCES FOR SECOND READING a) SECOND READING OF AN ORDINANCE NO. 623 TO PROVIDE FOR ADOPTION OF A BUDGET AMENDMENT CONTAINING ESTIMATES OF REVENUE AND EXPENDI TURE CHANGES FOR PICKENS COUNTY FOR THE FISCAL YEAR BEGINNING JULY 1, 2022 AND ENDING JUNE 30, 2023. b) SECOND READING OF AN ORDINANCE NO. 624 TO PROVIDE FOR THE LEVY OF TAXES IN PICKENS COUNTY FOR ORDINARY COUNTY PURPOSES FOR THE FISCAL YEAR BEGINNING JULY 1, 202 3, AND ENDING JUNE 30, 202 4, AND TO DIRECT EXPENDITURE THEREOF. c) SECOND READING OF AN ORDINANCE No. 625 REGARDING AMENDMENTS TO CHAPTER 6 OF THE PICKENS COUNTY CODE OF ORDINANCES SPECIFIC TO THE OPERATIONS OF THE PICKENS COUNTY AIRPORT AND MATTERS RELATED THERETO. 10. ORDINANCES FOR THIRD READING None 222 MCDANIEL AVENUE, B-1 ∙ PICKENS, SC 29671 ∙ 864.898.5856 ∙ WWW.CO.PICKENS.SC.US 11. OTHER REQUEST AGENDA ITEMS 12. CONSENT AGENDA. Routine matters and resolutions, as well as subject referrals to Council committees, can be accomplished by one vote via the Council’s Consent Agenda. a) Pickens County Water Authority b) Sewer Capacity c) Council Rules 13. EXECUTIVE SESSION: S.C. Code of Laws, Section 30-4-70 (A) allows that specifically delineated and qualifying matters may be discussed outside the presence of the public. Economic Development – Section 30-4-70 (a) (5)  Safeplast 14. ACTION ON EXECUTIVE SESSION ITEMS (as needed) While the SC Freedom of Information Act allows for certain matters to be discussed outside the presence of the public, any votes on such matters can only take place once Council has returned to public session. 15. APPOINTMENTS TO BOARDS AND COMMISSIONS 16. ADJOURN No. 3: APPROVAL OF MINUTES  April 3, 2023  April 17, 2023 – Special-Called Meeting  April 24, 2023 – Budget Work Session  April 26, 2023 – Special-Called Meeting Minutes for April 3, 2023 Pickens County Council Meeting 1 Regular Pickens County Council Meeting April 3, 2023 6:30 PM County Council met in regular session, in the Auditorium of the County Administration Facility, with Chairman Chris Bowers presiding. Final agendas, bearing date, time, and location of meeting were mailed to members of council and local news media on March 29, 2023. Council Members in Attendance: Chris Bowers, Chairman Roy Costner, Vice Chairman Alex Saitta, Vice Chairman Pro-Tem Chris Lollis Henry Wilson C. Claiborne Linvill (absent) Staff in Attendance: Ken Roper, County Administrator Les Hendricks, Contract Attorney Meagan Nations, Clerk to Council WELCOME AND CALL TO ORDER: Chairman Chris Bowers called the meeting of April 3 , 2023 to order an d welcomed those in attendance. Vice Chairman Roy Costner led the Invocation and the Pledge of Allegiance. Chairman Chris Bowers made a motion to suspend the rules, and move Agenda Item #11A first on the agenda. Motion was seconded by Vice Chairman Roy Costner and carried unanimously (5-0). OTHER AGENDA ITEMS: a.) PRESENTATION OF CITIZEN AWARD – The Chairman presented the Citizen Award to Tammy Anthony, and the late Bobby Smith. PUBLIC FORUM: Chairman Chris Bowers opened the Public Forum and requested the Clerk to call upon the citizens signed up to speak. 1. Juliet Penna: Ms. Penna addressed Council regarding the Library. 2. Johnnelle Raines: Ms. Raines addressed Council regarding FOIA. 3. David Parsons: Mr. Parsons addressed Council regarding Motor coach Resort above Sunset Marina at Gap Hill. 4. Lori Osborn: Ms. Osborn addressed Council regarding the Library. 5. Unice Leymaker: Ms. Leymaker addressed Council regarding the Library. Minutes for April 3, 2023 Pickens County Council Meeting 2 6. Bill Ranson: Mr. Ranson addressed Council regarding the Library. APPROVAL OF MINUTES: Chairman Chris Bowers called for a motion to approve the following minutes as presented: o March 6, 2023 Regular-Called Council Meeting o Motion was made by Councilman Alex Saitta, and seconded by Councilman Chris Lollis. Seeing no discussion, the motion carried unanimously (5-0). ADMINISTRATOR’S REPORT: Mr. Roper addressed Council on the following:  2023 Council Goals – People, Purpose, Plan  Introduced the new Human Resources Manager, Samantha Greer  Wayfinding Signage  Council Chambers Technology Update  Andrew Pickens Gravesite Restoration Council asked Mr. Roper questions that included, but was not limited to:  Question regarding Wayfinding Signage  Question regarding Landfill Drop Off Sites  Question regarding freshly cut grass in the road re: Motorcycles (State Law)  Question regarding Litter Crews on Roads COMMITTEE REPORTS: Committee of the Whole Report for 3/13/23: COMMITTEE OF THE WHOLE: UDSO – Log No. 141  Mr. Roper gave a brief overview of the Unified Development Standards Ordinance, stating the UDSO regulates the use of land, the location and use of buildings and other site improvements, and the construction of public facilities and private improvemen ts related to the development of land.  Planning Staff presented Council with a recommended plan of action and had detailed discussion on changes that Council would like to see updated in the ordinance.  Council and staff had detailed discussion that inclu ded, but was not limited to:  Attainable Housing Program  Subdivisions  Land Use Matrix  DHEC Requirements  Tree Canopy/Waterway Protection  Riparian Setback Proposal  Recreational Vehicle (RV) Parks and Campgrounds  Tiny Home Development  Townhome Development  Traffic Study Policy  Traffic Study Responsibilities  Roads  County-Wide Mobility Plan Minutes for April 3, 2023 Pickens County Council Meeting 3  RFP – County Development Impact Fee Study  No Action Taken by the Committee. Council Action on Log No. 141 – No Action Taken by the Committee. ADJOURN: Hearing no furthe r Committee business, Vice Chairman Roy Costner called for a motion to adjourn. Motion was made by Councilman Henry Wilson, seconded by Chairman Chris Bowers and carried unanimously (6 -0). Meeting was adjourned at 8:27 p.m. COUNCIL CORRESPONDENCE: Chairman Chris Bowers announced the following:  Non-Essential County Offices will be closed on Friday, April 7, for the Good Friday Holiday.  The Committee of the Whole meeting will take place on Monday, April 17, 2023, at 6:00 p.m. in the Main Conference Room of the Administration Building.  The next Council meeting will be held on Monday , May 1, at 6:30 p.m. in Council Chambers of the Administration Building. Chairman Bowers called for other council correspondence. Seeing no other c orrespondence, Chairman Bowers announced moving to Motion Period and New Business. MOTION PERIOD AND NEW BUSINESS: Chairman Chris Bowers opened the floor for motion period and new business. Seeing no discussion, Chairman Bowers closed the floor. ORDINANCES FOR FIRST READING AND/OR RESOLUTIONS: a) FIRST READING IN TITLE ONLY OF AN ORDINANCE NO. 623 TO PROVIDE FOR ADOPTION OF A BUDGET AMENDMENT CONTAINING ESTIMATES OF REVENUE AND EXPENDITURE CHANGES FOR PICKENS COUNTY FOR THE FISCAL YEAR BEGINNING JULY 1, 2022 AND ENDING JUNE 30, 2023. o Chairman Chris Bowers called for a motion to constitute first reading in title only of this Ordinance. Motion was made by Vice Chairman Roy Costner, seconded by Councilman Henry Wilson and carried (3 -2), with Councilman Alex Saitta and Councilman Chris Lollis opposed. b) FIRST READING IN TITLE ONLY OF AN ORDINANCE NO. 624 TO PROVIDE FOR THE LEVY OF TAXES IN PICKENS COUNTY FOR ORDINARY COUNTY PURPOSES FOR THE FISCAL YEAR BEGINNING JULY 1, 2023, AND ENDING JUNE 30, 2024, AND TO DIRECT EXPENDITURE THEREOF. o Administrator Ken Roper read a transmittal letter to Council. o Chairman Chris Bowers called for a motion to constitute first reading in title only of this Ordinance. Motion was made by Vice Chairman Roy Costner, seconded by Councilman Henry Wilson and carried unanimously (5-0). Minutes for April 3, 2023 Pickens County Council Meeting 4 c) FIRST READING IN TITLE ONLY OF AMENDMENTS TO CHAPTER 6 OF THE PICKENS COUNTY CODE OF ORDINANCES SPECIFIC TO THE OPERATIONS OF THE PICKENS COUNTY AIRPORT AND MATTERS RELATED THERETO. o Administrator Roper asked Council to refer to the Committee of the Whole for further discussion. o Chairman Chris Bowers called for a motion to constitute first reading in title only of this Ordinance. Motion was made by Vice Chairman Roy Costner, seconded by Councilman Henry Wilson. o Chairman Chris Bowers made an amendment, stating after first reading, he would like to commit this to the Committee of the Whole log. Motion was seconded by Vice Chairman Roy Costner and carried unanimously (5-0). o The original motion carried unanimously (5-0). d) CONSIDERATION OF A RESOLUTION NO. 2023 -10 RECOGNIZING APRIL 9 – APRIL 15, 2023 AS NATIONAL TELECOMMUNICATORS WEEK. o Chairman Chris Bowers called for a motion to consider this Resolution. Motion was made by Councilman Henry Wilson, seconded by Councilman Chris Lollis and carried unanimously (5-0). e) CONSIDERATION OF A RESOLUTION NO. 2023 -11 DESIGNATING APRIL 2023 AS FAIR HOUSING AWARENESS MONTH IN PICKENS COUNTY. o Chairman Chris Bowers called for a motion to consider this Resolution. Motion was made by Councilman Henry Wilson, seconded by Councilman Roy Costner and carried unanimously (5-0). f) CONSIDERATION OF A RESOLUTION NO. 2023 -12 TO APPROVE AN AGREEMENT BETWEEN PICKENS COUNTY AND THE SOUTH CAROLINA ASSOCIATION OF COUNTIES RELAT ING TO THE SOUTH CAROLINA ASSOCIATION OF COUNTIES BEING AUTHORIZED AND DESIGNATED AS THE CLAIMANT AGENT FOR THE COUNTY PURSUANT TO THE SETOFF DEBT COLLECTION ACT OF 2003, AS AMENDED AND THE GOVERNMENTAL ENTERPRISE ACCOUNTS RECEIVABLE PROGRAM, AS SET OUT IN § 12-4-580 (2003). o Chairman Chris Bowers called for a motion to consider this Resolution. Motion was made by Vice Chairman Roy Costner, seconded by Councilman Henry Wilson and carried unanimously (5-0). ORDINANCES FOR SECOND READING a) SECOND READING OF AN ORDINANCE NO. 621 AUTHORIZING (1) THE EXECUTION AND DELIVERY OF A FEE-IN-LIEU-OF-TAX AND INCENTIVE AGREEMENT BY AND BETWEEN PICKENS COUNTY, SOUTH CAROLINA AND A COMPANY KNOWN TO THE COUNTY AT THIS TIME AS PROJECT SIERRA FOXTROT, ACTING FOR ITSELF, ONE OR MORE SUBSIDIARIES, AFFILIATES, SUCCESSORS, ASSIGNS, LESSORS OR OTHER PROJECT SPONSORS, PURSUANT TO WHICH THE COUNTY SHALL COVENANT TO ACCEPT CERTAIN NEGOTIATED PAYMENTS IN LIEU OF AD VALOREM TAXES WITH RESPECT TO CERTAIN FACILITIES IN THE COUNTY; (2) THE BENEFITS OF A MULTI-COUNTY INDUSTRIAL OR BUSINESS PARK TO BE MADE AVAILABLE TO THE COMPANY AND THE PROJECT; (3) THE CONVEYANCE OF CERTAIN PROPERTY TO THE COMPANY AND THE REIMBURSEMENT TO THE Minutes for April 3, 2023 Pickens County Council Meeting 5 COMPANY OF CERTAIN INCURRED COSTS; AND (4) OTHER MATTERS RELATING THERETO. o Chairman Chris Bowers called for a motion to constitute second reading of this Ordinance. Motion was made by Councilman Henry Wilson, seconded by Vice Chairman Roy Costner and carried unanimously (5-0). ORDINANCES FOR THIRD READING a) PUBLIC HEARING AND THIRD READING OF AN ORDINANCE NO. 622 ADOPTING A SIX MONTH MORATORIUM ON THE ACCEPTANCE OF APPLICATIONS FOR RESIDENTIAL LAND USE, DEVELOPMENT, OR SUBDIVISION CONCEPT PLANS, TO PROVIDE FOR AN IMMEDIATE EFFECTIVE DATE, AND TO PROVIDE FOR AN EXTENTION OF NINETY DAYS HERETO BY FURTHER RESOLUTION OF COUNCIL. o Chairman Bowers opened the public hearing for comments regarding this Ordinance. Seeing none, Chairman Bowers declared the public hearing closed. o Chairman Chris Bowers called for a motion to constitute third reading of this Ordinance. Motion was made by Vice Chairman Roy Costner, seconded by Councilman Chris Lollis and carried unanimously (5-0). CONSENT AGENDA Chairman Chris Bowers called for a motion to approve the Consent Agenda as presented: 1) 2023 Recreation Funding Applications 2) 2023 Accommodations Tax Applications o Motion was made by Vice Chairman Roy Costner, seconded by Councilman Chris Lollis and carried unanimously (5-0). EXECUTIVE SESSION: S.C. Code of Laws, Section 30-4-70 (a): Chairman Chris Bowers called for a motion to convene into Executive Session as defined by S.C. Code of Laws, Section 30-4-70 (a). Chairman Bowers further stated that each issue would be discussed as the Law provides. Boards and Commissions – Section 30-4-70 (a) (1)  ATAX Committee  Beautification Committee o Motion was made by Councilman Alex Saitta, seconded by Councilman Chris Lollis and carried unanimously (5-0), to convene in executive session for the stated purposes after a five-minute recess. Minutes for April 3, 2023 Pickens County Council Meeting 6 ACTION AS NEEDED VIA EXECUTIVE SESSION ITEMS: Chairman Chris Bowers called the Public Session back to Order and advised the following: Boards and Commissions – Section 30-4-70 (a) (1)  ATAX Committee – No Action Taken  Beautification Committee – Chairman Chris Bowers made a motion to appoint Danny McCullen to the Beautification Committee in the District 5 seat. Motion was seconded by Councilman Alex Saitta and carried unanimously (6-0). Personnel – Section 30-4-70 (a) (1)  Citizen Award – No Action Taken. ADJOURN: Hearing no further Council business, Chairman Chris Bowers made a motion to adjourn. The motion was seconded by Councilman Chris Lollis and carried unanimously (5-0). Pickens County Council stood adjourned at 8:15 p.m. Respectively Submitted: Approved: Meagan Nations, Clerk to Council Chris Bowers, Chairman of County Council Minutes for April 17, 2023 Pickens County Council Meeting 1 Special-Called Pickens County Council Meeting April 17, 2023 6:00 PM County Council met in special-called session, in the Auditorium of the County Administration Facility, with Chairman Chris Bowers presiding. Final agendas, bearing date, time, and location of meeting were mailed to members of council and local news media on March 8, 2023. Council Members in Attendance: Chris Bowers, Chairman Roy Costner, Vice Chairman Alex Saitta, Vice Chairman Pro-Tem Chris Lollis Henry Wilson C. Claiborne Linvill (absent) Staff in Attendance: Ken Roper, County Administrator Les Hendricks, Contract Attorney Meagan Nations, Clerk to Council Ralph Guarino, Finance Director WELCOME AND CALL TO ORDER: Chairman Chris Bowers called the meeting of April 17 , 2023 to order an d welcomed those in attendance. Vice Chairman Roy Costner led the Invocation and the Pledge of Allegiance. APPROVAL OF MINUTES Chairman Chris Bowers called for a motion to approve the following minutes as presented: o March 13, 2023 Special-Called Council Meeting o Motion was made by Councilman Alex Saitta, and seconded by Vice Chairman Roy Costner. Seeing no discussion, the motion carried unanimously (4-0). Councilman Henry Wilson was not present for the vote. OVERVIEW OF BUDGET AMENDMENT ORDINANCE NO. 623 Ralph Guarino and Ken Roper gave a detailed presentation of the Budget Amendment Ordinance. OVERVIEW OF FY 2024 BUDGET AMENDMENT ORDINANCE NO. 624 Ralph Guarino presented a presentation and went into great detail on the following:  Total Budget for All Funds  Mr. Guarino went into explanation on the Total Budget for all funds, which included FY 2023 and FY 2024  Financial Highlights  Balanced Budget  No tax increase for any fund  3% COLA adjustment for all employees Minutes for April 17, 2023 Pickens County Council Meeting 2  Positions  54 positions were requested, only 11 recommended  Capital  Capital was considered in the fall of 2022 and reflected in the FY24 budget  15% for Property - $140,452  10% for Liability  8% for Medical Insurance - $187,876  1% for Retirement System  18% increase for fuel costs - $203,160  40% increase for repairs to vehicles $405,820  General Fund  Increased revenues by $8.1 million  Taxes  Investment Income  Local Government Fund  Election Reimbursement  Library Revenue  Moved Library from Special Revenue Fund to General Fund  Compensation study  Public relations consultant  Election costs for FY 2024  Other Funds  Tri-County Technical College  Fund balance will not be used for funding  TCTC has not submitted request for FY 2024  Fixed Nuclear Fund  No change  Library Fund  Moved to General Fund  Commerce Park  No Change  Victim Service Fund  Supplement operations by General Funds since fines are declining  Emergency Telephone  No change  State Accommodations Tax Fund  Increase in revenue, can be used for tourism related costs  Local Accommodations Tax Fund  Increase in revenue; can be used for tourism related costs  Road Maintenance Fee Fund  No change  Recreation Fund  No change  Road Maintenance  No change Minutes for April 17, 2023 Pickens County Council Meeting 3  Road Reserve  No change  Escheatment  Collections of escheated funds  Pickens Alliance Fund  No change  Conservation Fund  New fund that was enacted by Council in December  Public Service Commission  Increase rate by. xx cents to cover costs of deferred maintenance on the treatment plans  Airport Fund  No change  Fire Districts  Purchase two fire trucks (will pay cash for trucks)  Value of a Mil  Millage Rates  Council had detailed discussion that included, but was not limited to:  Budget for Rescue  Code Enforcement Officer Budget  Discussion on hiring litter crews  EMS Shifts  Comparison of Revenue between this year and future budget year  Discussion on the new fire trucks  Fire staff  Staff vacancies  Sewer capacity  Public Service Commission  Economic Development  Sheriff’s Office // School Resource Officers  School District  Public Safety ADJOURN: Hearing no further Council business, Council adjourned the meeting to move to the Committee of the Whole meeting. Pickens County Council stood adjourned at 6:50 p.m. Respectively Submitted: Approved: Meagan Nations, Clerk to Council Chris Bowers, Chairman of County Council Pickens County Council Budget Work Session Report April 24, 2023 1 Pickens County Council Budget Work Session Report Monday, April 24, 2023 6:00 PM Main Conference Room 222 McDaniel Avenue Pickens, SC 29671 Pickens County Council met to hold a work session to discuss the FY 2023-2024 proposed budget. Chairman Chris Bowers presided with all members in attendance. The meeting was called to order at 6:00 p.m. Council Members in Attendance: Chris Bowers, Chairman Roy Costner, Vice Chairman Henry Wilson Alex Saitta Claiborne Linvill Chris Lollis Staff in Attendance: Ken Roper, County Administrator Meagan Nations, Clerk to Council Les Hendricks, Contract County Attorney Ralph Guarino, Finance Director The discussion of budgetary items included, but not limited to the following:  Rescue Squad Budget Increase  Fire Department Equipment  2 new pumpers (Station 12 & Station 13)  Discussion of New Positions Proposed  Discussion of Positions Requested  Economic Development  Current Alliance Pickens Budget: $553,269  Proposed Alliance Pickens Budget: $547,117  Expenses on Economic Development land over the past year: $4.8 million  $2.7 million Project Farmhouse A  $2.1 million Project Big Dog  Public Service Commission  Implicates ongoing UDSO conversation  Request dedicated budget work session  Sheriff’s Office/School Resource Officers  Existing expense: Salary and benefits $745,949  Cost for 1 more: $74,595  Awaiting more information from SDPC  911 Dispatch  Current // Proposed // Future  Public Safety  Current Flow of Calls  FY 2024 Proposal  Six new positions costing $335,676 Pickens County Council Budget Work Session Report April 24, 2023 2  Funding from 2 municipalities at $47,000 per year  Balance made up from county millage  Four existing dispatch positions at Liberty absorbed  Hire 2 new dispatchers  Allow us to do dispatch for Central, Pickens, Liberty  Build capacity for future dispatch ability  Pickens County Sheriff’s Office in agreement with future reassignment based on capabilities  Rollback taxes  Library Mileage  Tri-County Technical College Budget Increase ADJOURN: Hearing no further Council business, Chairman Chris Bowers called for a motion to adjourn. Motion was made by Vice Chairman Roy Costner, seconded by Councilman Chris Lollis and carried unanimously (6-0). Pickens County Council stood adjourned at 8:24 p.m. Minutes for April 26, 2023 Special Called Meeting (Alliance Pickens) 1 Special Called County Council Meeting April 26, 2023 3:00 PM County Council met in special session at Alliance Pickens, with Chairman Chris Bowers presiding. Agendas, bearing date, time, and location of meeting were mailed to members of council and local news media on April 21, 2023. Council Members in Attendance: Chris Bowers, Chairman Roy Costner, Vice Chairman Alex Saitta, Vice Chairman Pro-Tem C. Claiborne Linvill Chris Lollis Henry Wilson Staff in Attendance: Ken Roper, County Administrator Meagan Nations, Clerk to Council WELCOME AND CALL TO ORDER: Chairman Chris Bowers called the meeting of April 26, 2023 to order and welcomed those in attendance. Vice Chairman Roy Costner led the Invocation and Pledge of Allegiance. PUBLIC HEARING AND THIRD READING OF AN ORDINANCE NO. 621 AUTHORIZING (1) THE EXECUTION AND DELIVERY OF A FEE -IN-LIEU-OF-TAX AND INCENTIVE AGREEMENT BY AND BETWEEN PICKENS COUNTY, SOUTH CAROLINA AND A COMPANY KNOWN TO THE COUNTY AT THIS TIME AS PROJECT SIERRA FOXTROT, ACTING FOR ITSELF, ONE OR MORE SUBSIDIARIES, AFFILIATES, SUCCESSORS, ASSIGNS, LESSORS OR OTHER PROJECT SPONSORS, PURSUANT TO W HICH THE COUNTY SHALL COVENANT TO ACCEPT CERTAIN NEGOTIATED PAYMENTS IN LIEU OF AD VALOREM TAXES WITH RESPECT TO CERTAIN FACILITIES IN THE COUNTY; (2) THE BENEFITS OF A MULTI -COUNTY INDUSTRIAL OR BUSINESS PARK TO BE MADE AVAILABLE TO THE COMPANY AND THE PROJECT; (3) THE CONVEYANCE OF CERTAIN PROPERTY TO THE COMPANY AND THE REIMBURSEMENT TO THE COMPANY OF CERTAIN INCURRED COSTS; AND (4) OTHER MATTERS RELATING THERETO. Chairman Bowers opened the public hearing for comments regarding Ordinance 621. Hearing none, Chairman Bowers declared the public hearing closed. Chairman Chris Bowers asked for a motion to constitute third reading of Ordinance 621. o Councilman Alex Saitta made the motion to constitute third reading, and the motion was seconded by Vice Chairman Roy Costner. o Vice Chairman Roy Costner moved to amend the company name to FN America, LLC. Motion was seconded by Councilman Alex Saitta and carried unanimously (6- 0).  Chairman Bowers asked if there was any discussion on the original motion.  Councilwoman Claiborne Linvill stated she will be voting no on this ordinance. She stated she feels she had questions and comments that were not fully resolved.  Councilman Saitta stated he is a strong second amendment supporter and he is happy to offer FN America, LLC a home in Pickens County. Minutes for April 26, 2023 Special Called Meeting (Alliance Pickens) 2 o Seeing no other discussion, the original motion as amended carried (5-1), with Councilwoman Claiborne Linvill opposed. ADJOURN: Hearing no further Council business, Chairman Chris Bowers called for a motion to adjourn. Motion was made by Vice Chairman Roy Costner, seconded by Councilman Henry Wilson and carried unanimously (6-0). Pickens County Council stood adjourned at 3:06 p.m. Respectively Submitted: Approved: Meagan Nations, Clerk to Council Chris Bowers, Chairman of County Council No. 5: COMMITTEE REPORT  April 17, 2023 COMMITTEE OF COUNCIL AS A WHOLE REPORT 1 Committee of the Whole Meeting Report – April 17, 2023 Council Members: Chris Bowers, Chairman Roy Costner, Vice Chairman Chris Lollis Alex Saitta Henry Wilson C. Claiborne Linvill (absent) Staff in Attendance: Ken Roper, County Administrator Meagan Nations, Clerk to Council Les Hendricks, Attorney Carlos Salinas, Airport Director Trad Julian, Senior Planner Todd Steadman, Part Time Planner The Committee of the Whole met in the Main Conference Room , at the Pickens County Administration Facility, on Monday, April 17, 2023. All members of the committee were in attendance with Chairman Chris Bowers presiding, with exception of Councilwoman Claiborne Linvill. Vice Chairman Roy Costner led the Invocation and Pledge of Allegiance. WELCOME AND CALL TO ORDER: Chairman Chris Bowers called the Committee of the Whole meeting to order. COMMITTEE OF THE WHOLE: DISCUSSION ON AMENDMENTS TO CHAPTER 6 OF THE PICKENS COUNTY CODE OF ORDINANCES SPECIFIC TO THE OPERATIONS OF THE PICKENS COUNTY AIRPORT AND MATTERS RELATED THERETO - Log No. 212  Carlos Salinas stated he comes before Council this evening regarding a proposed revision to the County Code to allow for an off runway ultralight operations at the County Airport, which is currently not allowed. He stated this proposal is the result of about a year and a half back and forth between the FAA and Pickens County. He stated upon receipt of a request for off runway ultralight usage, IAW our current code and in consideration of local conditions, we exercised our right to deny the request on the grounds of concerns with safety and efficiency. From there, the request went to appeal with the FAA. Mr. Salinas went into great detail how on one side, we are bound by grant assurances that require us to preserve public access with some caveats and, on the other side, the FAA acknowledges the partnership created by a State entity that owns the land below the federal airspace and retains some ownership rights. He stated the end result is that the FAA advises that we accommodate this request to avoid endangering our federal funding and status as part of the National Plan of Integrated Airport Systems (NPIAS). Mr. Salinas stated advised in order to do so, we’ll need to revise our code which does not allow for off runway operations. Mr. Salinas stated while Staff continues to have reservations about the safety and efficiency of ultralight operations at our Airport, he does not advise that we jeopardize our funding or NPIAS status. He stated our reservations have been logged with the FAA and we have asked our Congressional Delegation to broker our concerns with higher headquarters while we move toward implementation.  After discussion between Council and Staff, Chairman Chris Bowers made a motion to move out of COMMITTEE OF COUNCIL AS A WHOLE REPORT 2 Committee of the Whole Meeting Report – April 17, 2023 Committee. Motion was seconded by Councilman Alex Saitta and carried unanimously (5-0).  Chairman Chris Bowers made a motion to move out of Committee. Motion was seconded by Councilman Alex Saitta and carried unanimously (5-0). UDSO – Log No. 141  Planning Staff presented Council with a recommended plan of action and had detailed discussion on changes that Council would like to see updated in the ordinance.  Council and staff had very detailed discussion that included, but was not limited to:  Wave Growth hitting Pickens County  Expanded Proposal regarding:  Create 123/93 Corridor Overlay  Modify the Comprehensive Plan  Regional Planning Committee  Appeals  Implementation Schedule  More discussion regarding Housing Challenges and Attainable Housing Program to be discussed at the next Committee of the Whole meeting in May.  No Action Taken by the Committee. ADJOURN: Hearing no further Committee business, Vice Chairman Roy Costner called for a motion to adjourn. Motion was made by Vice Chairman Roy Costner, seconded by Councilman Chris Lollis and carried unanimously (5-0). Meeting was adjourned at 8:17 p.m. may 2023 Unified Development Standards Ordinance PICKENS COUNTY DIVISION OF COMMUNITY & TOURISM DEVELOPMENT FIRST READING IN TITLE ONLY OF AN ORDINANCE ADDRESSING GROWTH ISSUES IN PICKENS COUNTY BY AMENDING THE UNIFIED DEVELOPMENT STANDARDS ORDINANCE SO AS TO PROVIDE FOR LIMITATIONS ON SUBDIVISIONS, MINIMIZE PRESSURE ON EXISTING ROADWAYS, INCREASE OPEN SPACES, REGULATE SUBSTANDARD HOUSING, AS WELL AS INCREASE PROTECTION OF TREE CANOPIES, NATURAL SPACES, AND WATERWAYS. PROPOSED UDSO AMENDMENTS ITEM 9A – CONVENTIONAL SUBDIVISIONS OVERVIEW In the exploration of ways to help manage the type of growth the County is and expects to experience in the years ahead, staff has made a series of recommendations. One recommendation is to limit conventional subdivisions to 10 lots. This protects families and small developers by allowing that option to exist but only on a smaller scale. On the other hand, it promotes larger developments to use either the Open Space Subdivision or the Master Planned Development options, both of which provide better protections and benefits to the County. PROPOSED TEXT AMENDMENT TO UDSO ARTICLE 5 Section 504: Conventional Subdivisions 504 (a) Maximum number of lots. The maximum n umber of lots (or dwelling units) in a Conventional Subdivision shall be determined by the gross acreage of the subdivision site divided by the minimum lot size allowed but shall not exceed 10 lots. PROPOSED UDSO AMENDMENTS ITEM 9b – OPEN SPACE SUBDIVISIONS OVERVIEW In the exploration of ways to help manage the type of growth the County is experiencing, and expects to experience in the years ahead, staff has made a series of recommendations. One recommendation is to limit conventional subdivisions to 10 lots. This protects families and small developers by allowing that option to exist but only on a smaller scale. On the other hand, it promotes larger devel opments to use either the Open Space Subdivision or the Master Planned Development options, both of which provide better protections and benefits to the County. In looking at the current standards for Open Space Subdivisions it was determined that there were opportunities to strengthen the ordinance. The major changes were to increase the amount of required open space from 20% to 30%, require a provision for parking, require tree plantings, and to protect the areas being set aside as open space. PROPOSED TEXT AMENDMENT TO UDSO ARTICLE 5 Sec. 505 Open space subdivisions. Open Space Development provisions may be applied to any single-family detached subdivision. In addition to any conditions of land use approval that may apply to a specific property, the following shall apply to all Open Space Subdivisions: 505 (a) Quality development standards. An Open Space Subdivision shall comply with the open space and residential development standards of Sec 507 as a prerequisite for approval. 505 (b) 30% of the total acreage for all Open Space Subdivisions is to be set aside as permanent open space per 507 (a) 506 (a) All projects must demonstrate to the County Engineer adequate lane width for on-street parking or adequate driveway length and width for adequate off-street parking or show designated guest parking areas. 506 (b) All projects must provide a 5’ minimum sidewalk along any road frontages that have curb cuts. 507 (a) Common open space. Acreage not utilized for residential lots, roadway access and utilities shall be placed in common open space or devoted to recreation amenities. (1) A minimum percent of the gross project site area shall be reserved for common open space, as follows: no less than 30% of the total site must be set aside as open space for conservation, pre servation or passive recreational use, s uch as walking trails and picnicking. Examples of areas to be considered for open space protection are scenic vistas, natural water courses, woodlands, waterfalls, coves, geologic features, wetlands, floodplains, lakes, creeks, and land with slopes exceeding twenty-five (25) percent. (2) Land devoted to stormwater detention facilities may not be counted toward the 30% minimum unless the facility is a permanent lake or pond, and is designed and intended for recreational access and use by the occupants of the development. (3) In Master Planned Developments, additional common open space may be provided and may include active recreation areas for the proposed development, such as swimming pools, tennis courts, community facilities, etc. PROPOSED UDSO AMENDMENTS (4) Required buffers on the perimeter of the property may be included in the mini- mum open space requirement. (5) While common open space shall not be required to be contiguous, no individual portion of the 30% minimum required open space shall be less than 50 feet wide in its narrowest dimension, except as follows: a. The open space area, by the very nature of its designated boundaries, is less than 50 feet in width. Examples include strips of steep slopes and “fingers” of floodplains that extend up drainage swales. b. Parkways between road travel ways, which must be at least 26 feet in width in order to be counted as part of the minimum 30% requirement. (6) No portion of the residential lots shall be credited toward the minimum open space requirement unless the portion is included within the conservation easement. No portion of any street right-of-way or public or private utility easement shall be credited toward the minimum open space requirements. (7) The required common open space shall be platted at the same time that adjacent residential lots are platted, in whole or in phases. (8) 75% of the required open space shall be protected prior to construction and remain protected throughout construction unless the Planning Commission determines the area can be accessed for improvements. (9) Open Space Subdivisions require planting two (2) 2.5” caliper canopy trees per lot or dwelling unit. These trees are to be planted in the common open space, rights -of-ways, buffers, and or other areas approved by the Planning Department and shall be planted using best practices and a planting detail approved by the Planning Commission. (10) All lighting shall be Dark Sky Compliant. PROPOSED UDSO AMENDMENTS ITEM 9c – standards matrix OVERVIEW Council requested a matrix to make it easier for citizens to view critical information for various uses. Table 5.5 Land Use Matrix WELL & SEPTIC TANK PUBLIC WATER & SEPTIC TANK PUBLIC WATER & PUBLIC SEWER MULTIPLE LOT RURAL SPLIT Min Size 0.5 acre (21,780 sf) 0.5 acre (21,780 sf) 8,000 sf Width 50 ft 50 ft 50 ft Front 20 ft 20 ft 20 ft Side 7 ft 7 ft 7 ft Rear 10 ft 10 ft 10 ft CONVENTIONAL SUBDIVISION Min Size 1 acre (43,560 sf) 0.5 acre (21,780 sf) 8,000 sf Width 50 ft 50 ft 50 ft Front 20 ft 20 ft 20 ft Side 7 ft 7 ft 7 ft Rear 10 ft 10 ft 10 ft OPEN SPACE SUBDIVISION Min Size 1 acre (43,560 sf) 0.5 acre (21,780 sf) 5,000 sf Width 50 ft 30 ft 20 ft Front 20 ft 15 ft 10 ft Side 7 ft 5 ft 0 ft Rear 10 ft 5 ft 0 ft MASTER PLANNED DEVELOPMENT Min Size 0.5 acre (21,780 sf) 10,890 No Min Width Front Side Rear Concept Plan Concept Plan Concept Plan COMMERCIAL Min Size 1 acre (43,560 sf) 0.5 acre (21,780 sf) 10,000 sf Width 100 ft 50 ft 50 ft Front 20 ft 20 ft 20 ft Side 7 ft 7 ft 7 ft Rear 10 ft 10 ft 10 ft FAR 0.50 0.50 0.50 INDUSTRIAL Min Size 1 acre (43,560 sf) 0.5 acre (21,780 sf) 20,000 sf Width 100 ft 100 ft 50 ft Front 20 ft 20 ft 20 ft Side 7 ft 7 ft 7 ft Rear 10 ft 10 ft 10 ft FAR 0.75 0.75 0.75 PROPOSED UDSO AMENDMENTS ITEM 9e – parking lots OVERVIEW Staff was asked to review the UDSO for ways to provide for better protection of and replacement of our tree canopy and protecting our waterways. One of the areas with greatest potential was to have landscaped standards and paving standards for parking lots that will have over 25 spaces. This only relates to new or refurbished parking lots. PROPOSED TEXT AMENDMENT TO UDSO ARTICLE 6 Sec. 603 Number of parking spaces required. 603 (a) Parking for residents, employees, customers and visitors. Space for the parking of motor vehicles must be provided on every property that contains a principal use, for the safety and convenience of the people who live or work on the property, shop or do business on the property, or otherwise visit the property in the normal course of activity of the principal use. (1) Minimum number of parking spaces required. The minimum number of off-street parking spaces to be provided for residents, employees, customers and visitors for each type of land use shall be determined by the following Table 6 .1, rounded up to the neare st whole parking space. Developments containing two or more of the uses listed on Table 6.1 shall provide the number of spaces required for each use (except as may be reduced under Shared Parking, below). (2) For any use not shown on Table 6.1, th e Director of Community De velopment sha ll determine the appropriate minimum parking requirements for the use based on the requirements for similar uses, the operating characteristics of the use, or such other data, surveys or information upon which the Director deems relevant. Such an interpretation shall be considered an “administrative decision” for the purposes of appeal under the provisions of Article 13 of this Development Standards Ordinance. (3) All parking spaces in excess of the minimum required parking shall be installed as a pervious surface with a material or technique approved by the Stormwater Department. 606 (f) Landscaping. Vehicular use areas are defined as any area used for movement, circulation, parking, and/or display of any type of vehicle, including, but not limited to, parking lots, loading and unloading areas and sales service areas. Vehicular use areas under the jurisdiction of this Ordinance shall be located screened with a ten (10) foot Class 1 buffer and shall comply with the following standards: A. When a parking lot contains twenty -five (25) or more spaces, an area equal to twenty (20) percent of the total interior square footage of the vehicular use area shall be dedicated to landscaping. The twenty (20) percent landscape requirement is in addition to any required buffers as outlined in this Ordinance and in Article 8 of the Pickens County Unified Development Standards Ordinance. B. Landscaped areas shall contain a mixture of native canopy trees, understory trees, evergreens/conifers, and shrubs. Article 8 of the Pickens County Unified Development Standards Ordinance detai ls the minimum standards for plant sizes, substitutions, installation, and maintenance of landscaped areas. PROPOSED UDSO AMENDMENTS C. All paved area planting plans must demonstrate the likelihood of achieving 90% canopy coverage from hardwood trees after fifteen (15) years of growth. The objective is to prove reasonable likelihood of achieving this coverage at the time of planting/final approval. D. The minimum landscape area for each tree shall be no less than one hundred seventy (170) square feet with four (4) foot minimum distance between all trees and any paving at the time of planting, measured at the base of the tree. PROPOSED UDSO AMENDMENTS ITEM 9e – waterway protection OVERVIEW The Stormwater Ordinance was reviewed for ways to strengthen the standards for protecting our waterways per County Council directive. As such, staff has drafted an additional section of the Stormwater Ordinance introducing Riparian Setbacks of 50’ along Waters of the State and 100’ along a subset of “sensitive waters”. It is also proposed that the Riparian Setback will extend to the outer edge of the 100-year floodplain in areas where the width of the floodplain exceeds the width of the setback. Additionally, the Stormwater Ordinance was reviewed for internal consistency, consistency with other regulations, and overall clarity. PROPOSED TEXT AMENDMENTS TO STORMWATER ORDINANCE ON FOLLOWING PAGES PICKENS COUNTY STORMWATER Ordinance No. 392 First Reading: 07/16/2007 Public Hearing: 08/06/2007 Second Reading: 08/06/2007 Third Reading: 08/20/2007 Revised Apr 2023 2 Table of Contents Section 1 Definitions. ................................................................................................................................................ 4 Section 2 General Provisions. ................................................................................................................................. 13 2 (a) Purpose. ....................................................................................................................................................... 13 2 (b) Objectives. ................................................................................................................................................... 13 Section 3 Submittal Requirements. ........................................................................................................................ 15 3 (a) Sites with less than one disturbed acre unless otherwise exempt. ............................................................. 15 3 (b) Sites with greater than one disturbed acre. ................................................................................................. 15 Section 4 Scope. ...................................................................................................................................................... 15 Section 5 Land Disturbance Permits. ..................................................................................................................... 16 5 (a) Requirements. ............................................................................................................................................. 16 5 (b) Building permit. .......................................................................................................................................... 16 5 (c) Exemptions. ................................................................................................................................................. 16 5 (d) Review and approval of application. ........................................................................................................... 17 5 (e) Permit duration. .......................................................................................................................................... 17 5 (f) Notice of construction. ................................................................................................................................ 17 5 (g) Construction and inspections. .................................................................................................................... 17 5 (h) Final inspection and as built plans. ............................................................................................................. 18 Section 6 Maintenance. ........................................................................................................................................... 19 6 (a) Responsibility. ............................................................................................................................................. 19 6 (b) Failure to maintain. ..................................................................................................................................... 19 Section 7 Ongoing Inspection and Maintenance of Stormwater Facilities and Practices. .................................... 20 Section 8 Waivers and Variance. ............................................................................................................................ 20 8 (a) General information.................................................................................................................................... 20 8 (b) Conditions for waiver. ................................................................................................................................. 21 8 (c) Downstream damage, etc. prohibited. ....................................................................................................... 22 8 (d) Land disturbance permit not to be issued where waiver requested. ......................................................... 22 8 (e) Variance. ...................................................................................................................................................... 22 Section 9 Permit Procedures and Requirements. .................................................................................................. 22 9 (a) Stormwater design and/or BMP Manual. .................................................................................................. 22 9 (b) General performance criteria for stormwater management. ..................................................................... 23 9 (c) Minimum control requirements. ................................................................................................................ 24 Section 10 Stormwater Management Plan Requirements. ...................................................................................... 24 Section 11 Sediment and Erosion Control Plan Requirements. ............................................................................. 25 Section 12 Water Quality. ........................................................................................................................................ 26 12 (a) Treatment. ................................................................................................................................................... 26 12 (b) Stream channel protection. ......................................................................................................................... 26 12 (c) Structural stormwater controls. ................................................................................................................... 27 12 (d) Drainage system guidelines. ........................................................................................................................ 27 12 (e) Dam design guidelines. ............................................................................................................................... 28 Section 13 Existing Locations and Developments. .................................................................................................. 28 13 (a) Requirements for all existing locations and developments. ....................................................................... 28 13 (b) Requirements for existing problem locations. ........................................................................................... 28 13 (c) Inspection of existing facilities. ................................................................................................................... 28 Revised Apr 2023 3 13 (d) Corrections of problems subject to appeal. ............................................................................................... 29 Section 14 Illicit Discharges. ..................................................................................................................................... 29 14 (a) Scope. .......................................................................................................................................................... 29 14 (b) Prohibition of illicit discharges. .................................................................................................................. 29 14 (c) Prohibition of illicit connections. ................................................................................................................ 30 14 (d) Reduction of stormwater pollutants by the use of Best Management Practices. ...................................... 30 Section 15 Riparian Setbacks. ................................................................................................................................... 30 15 (a) Findings. ...................................................................................................................................................... 30 15 (b) Purpose. ....................................................................................................................................................... 31 15 (c) Pre-existing non-conforming structures or uses. ........................................................................................ 31 15 (d) Exemptions. ................................................................................................................................................. 32 15 (e) Riparian setback requirements. .................................................................................................................. 33 15 (f) Uses permitted in the riparian setback. ...................................................................................................... 33 15 (g) Uses prohibited in the riparian setback. ..................................................................................................... 35 Section 16 Right of Entry. ......................................................................................................................................... 35 Section 17 Pickens County Stormwater Board. ....................................................................................................... 36 Section 18 Violations, Enforcement, and Penalties. ................................................................................................ 36 18 (a) Violations. ...................................................................................................................................................... 36 18 (b) Penalties. ....................................................................................................................................................... 37 Section 19 Appeals. ................................................................................................................................................... 39 Section 20 Severability. ............................................................................................................................................. 39 Section 21 Conflict with Preceding Ordinance. ....................................................................................................... 40 Revised Apr 2023 4 Section 1 Definitions. For the purpose of this chapter, the following definitions shall apply: Words used in the singular shall include the plural, and the plural shall include the singular; words used in the present tense shall include the future tense. The word "shall" is mandatory and not discretionary. The word "may" is permissive. Words not defined in this section shall be construed to have the meaning given by common and ordinary use as defined in the latest edition of Webster's Dictionary. (1) Architect - an individual who, by reason of the individual’s general knowledge of the principles of architecture acquired by professional education and practical experience, is qualified to engage in the practice of architecture as attested by the individual’s registration as an architect. (2) As built plans - drawings depicting conditions as they were actually constructed. (3) Best Management Practices or (BMP(s)) - physical, structural, and/or managerial practices that have been approved by Pickens County, that when used singly or in combination, prevent or reduce pollution of water and that have been incorporated by reference into this ordinance as if fully set out therein. (4) Channel - a natural or artificial watercourse with a definite bed and banks that conducts flowing water continuously or periodically. (5) Community water - any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wetlands, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Pickens County. (6) Contaminant - any physical, chemical, biological, or radiological substance or matter in water. (7) Design storm event - a hypothetical storm event, of a given intensity, frequency, interval, and duration, used in the analysis and design of a stormwater facility. (8) Discharge - dispose, deposit, spill, pour, inject, seep, dump, leak, or place by any means, or that which is disposed, deposited, spilled, poured, injected, seeped, dumped, leaked, or placed by any means including any direct or indirect entry of any solid or liquid matter into Waters of the State. (9) Ditch - is a man-made channel other than a modified natural stream. They are Revised Apr 2023 5 constructed for drainage purposes. They may exhibit characteristics similar to streams. (10) Easement - an acquired privilege or right of use or enjoyment that a person, party, firm, corporation, municipality, or other legal entity has in the land of another. (11) Ephemeral Stream – a stream that conveys only stormwater in direct response to precipitation with water flowing only during and shortly after large precipitation events. An ephemeral stream may or may not have a well-defined channel, the aquatic bed is always above the water table, and stormwater runoff is the primary source of water. An ephemeral stream typically lacks the biological, hydrological, and physical characteristics commonly associated with the perennial and intermittent streams. (12) Erosion - the removal of soil particles by the action of water, wind, ice, or other geological agents, whether naturally occurring or acting in conjunction with or promoted by anthropogenic activities or effects. (13) Erosion and sediment control plan - a written plan (including drawings or other graphic representations) that is designed to minimize the accelerated erosion and sediment runoff at a site during construction activities. (14) FEMA - The Federal Emergency Management Agency (15) Hotspot (priority area) - an area where land use or activities generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater. (16) Illicit connections - illegal and/or unauthorized connections to the municipal separate stormwater system whether or not such connections result in discharges into that system. (17) Illicit discharge - defined at South Carolina Water Pollution Control Permits Regulation 61-9 122.26(b)(2) and refers to any discharges to a small municipal separate storm sewer system (SMS4) that is not composed of storm water, except discharges authorized under an NPDES permit (other than the NPDES permit for discharges from the SMS4) and discharges resulting from firefighting related activities. (18) Integrated management practice or IMP (IMP) - a Low Impact Development (LID) practice or combination of practices that are the most effective and practicable Revised Apr 2023 6 (including technological, economic, and institutional considerations) means of controlling the predevelopment site hydrology. (19) Intermittent Stream - a stream that has a well-defined channel that contains water for only part of the year, typically during winter and spring when the aquatic bed is below the water table. The flow may be heavily supplemented by stormwater runoff. An intermittent stream often lacks the biological and hydrological characteristics commonly associated with perennial streams. (20) Land disturbing activity - any activity on property that results in a change in the existing soil cover (both vegetative and non-vegetative) and/or the existing soil topography. Land-disturbing activities include, but are not limited to, development, re- development, demolition, construction, reconstruction, clearing, grading, filling, and excavation. (21) Landscape architect - is (a) a person who is licensed to practice landscape architecture in this State or (b) Landscape architecture is the performance of professional services, such as consultation, investigation, research, planning, design, preparation of drawings and specifications, and responsible inspection in connection with the development of land areas where, and to the extent that, the dominant purpose of the services is the preservation, enhancement, or determination of proper site design, natural land features, planting, naturalistic and aesthetic values, the settings and approaches to structures or other improvements, the setting of grades and determining drainage and providing for drainage structures, and the consideration and determining of environmental problems. (22) Large Construction Activity - the construction industrial activity as defined at §122.26(b)(14)(x) of SC Regulation 61-9 and incorporated here by reference. A large construction activity includes clearing, grading, and excavating resulting in a land disturbance that will disturb equal to or greater than five acres of total land area or is part of a larger common plan of development or sale that will ultimately disturb equal to or greater than five acres. Large construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the site. (23) Larger Common Plan of Development (LCP) - is a contiguous area where multiple Revised Apr 2023 7 separate and distinct construction activities may be taking place at different times on different schedules under one plan. For example, if a developer buys a 20-acre lot and builds roads, installs pipes, and runs electricity with the intention of constructing homes or other structures sometime in the future, this would be considered a larger common plan of development or sale. If the land is parceled off or sold, and construction occurs on plots that are less than one acre by separate, independent builders, this activity still would be subject to stormwater permitting requirements if the smaller plots were included on the original site plan. The larger common plan of development or sale also applies to other types of land development such as industrial parks or well fields. A permit is required if 1 or more acres of land will be disturbed, regardless of the size of any of the individually-owned or developed sites. (24) Low- Impact Development or (LID) - the integration of site ecological and environmental goal and requirements into all phases of urban planning and design from the individual residential lot level to the entire watershed. (25) LID – see 21 (26) Maintenance - any activity that is necessary to keep a stormwater facility in good working order so as to function as designed. Maintenance shall include complete reconstruction of a stormwater facility if reconstruction is needed in order to restore the facility to its original operational design parameters. Maintenance shall also include the correction of any problem on the site property that may directly impair the functions of the stormwater facility. (27) Municipal separate stormwater system (MS4) - the conveyances owned or operated by the municipality for the collection and transportation of stormwater, including the roads and streets and their drainage systems, catch basins, curbs, gutters, ditches, man- made channels, and storm drains (28) MS4 – see number 24 (29) National Pollutant Discharge Elimination System Permit (NPDES) - a permit issued to a discharger pursuant to regulations for all point source discharges into surface waters. (30) NPDES permit – see number 26 Revised Apr 2023 8 (31) Off-site facility – a structural BMP located outside the subject property boundary described in the permit application for land development activity. (32) On-site facility - a structural BMP located within the subject property boundary described in the permit application for land development activity. (33) Peak flow - the maximum instantaneous rate of flow of water at a particular point resulting from a storm event. (34) Perennial Stream – a stream that has flowing water year-round during a typical year. The water table is located above the stream bed for most of the year. Groundwater is the primary source of water for stream flow. Runoff from rainfall is a supplemental source of water for stream flow. A perennial stream exhibits the typical biological, hydrological, and physical characteristics commonly associated with the continuous conveyance of water. (35) Person - any and all persons, natural or artificial, including any individual, firm or association and any county, municipal, or private corporation organized or existing under the laws of this or any other state or country. (36) Person Responsible for the Land Disturbing Activity i. The person who has or represents having financial or operational control over the land disturbing activity; and/or ii. The landowner or person in possession or control of the land who directly or indirectly allowed the land disturbing activity or has benefited from it or who has failed to comply with any provision of this ordinance, or local ordinance adopted pursuant to the act as imposes a duty upon him. (37) Post-Development or Post-Construction - means the conditions which exist following the completion of the land disturbing activity in terms of topography, vegetation, land use and rate, volume or direction of stormwater runoff. (38) Pre-Development or Pre-Construction - means the conditions which exist prior to the initiation of the land disturbing activity in terms of topography, vegetation, land use and rate, volume or direction of stormwater runoff. (39) Professional Engineer - as defined in the South Carolina Code of Laws, Title 40, means a Category A license holder who, by reason of his/her special knowledge of the Revised Apr 2023 9 mathematical and physical sciences and the principles and methods of engineering analysis and design, acquired by professional education and practical experience, is qualified to practice engineering, all as attested by his/her legal license and registration as a professional in this State. (40) Professional Land Surveyor - as defined in the South Carolina Code of Laws, Title 40, means a person who is qualified to practice any discipline of TIER A or TIER B land surveying in this State, as attested by his/hers license and registration as a TIER A or TIER B professional land surveyor in this State. (41) Riparian - means areas that are transitional zones between aquatic and terrestrial ecosystems adjacent to or bordering a body of water such as a stream, lake, pond, or other watercourse that typically have distinct soil and vegetation characteristics influenced by the presence of water. (42) Runoff - precipitation from rain or snowmelt flows over the ground. Impervious surfaces like driveways, sidewalks, and streets prevent stormwater from naturally soaking into the ground. (43) Sediment - solid material, both mineral and organic, that is in suspension, is being transported, or has been moved from its site of origin by air, water, gravity, or ice and has come to rest on the earth's surface either above or below sea level. (44) Sedimentation - soil particles suspended in stormwater that can settle in streambeds and disrupt the natural flow of the stream. (45) Stabilization - providing adequate measures, vegetative and/or structural, that will prevent erosion from occurring. (46) Small Construction Activity – includes clearing, grading, and excavation resulting in a land disturbance that: i. will disturb equal to or greater than one (1) acre and less than five (5) acres of land; ii. will disturb less than one (1) acre of total land area but is part of a larger common plan of development or sale that will ultimately disturb equal to or greater than one (1) acre and less than five (5) acres. (47) Small Municipal Separate Storm Sewer System (SMS4) - is defined at South Carolina Water Pollution Control Permits Regulation 61-9 122.26 (b)(16) and refers to all small Revised Apr 2023 10 separate storm sewer systems that are owned or operated by the United States, a State, city, town, boroughs, county, parish, district, association, or other public body (created by or pursuant to State law) having jurisdiction over disposal of sewage, industrial wastes, storm water, or other wastes, including special districts under State law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under section 208 of the CWA that discharges to waters of the United States, but is not defined as “large” or “medium” municipal separate storm sewer system. This term includes systems similar to separate storm sewer systems in municipalities, such as systems at military bases, large hospital or prison complexes, and highways and other thoroughfares. The term does not include separate storm sewers in very discrete areas, such as individual buildings. (48) Stormwater - stormwater runoff, snow melt runoff, surface runoff, and street wash waters related to street cleaning or maintenance, infiltration and drainage. (49) Stormwater management - the programs to maintain quality and quantity of stormwater runoff to pre-development levels. (50) Stormwater management facilities - the drainage structures, conduits, ditches, combined sewers, sewers, and all device appurtenances by means of which stormwater is collected, transported, pumped, treated, or disposed of. (51) Stormwater management plan (SWMP) - the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMP’s, concepts, and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels. (52) Stormwater runoff - flow on the surface of the ground, resulting from precipitation. (53) Structural BMP’s - devices that are constructed to provide control of stormwater runoff. (54) Subdivision - all divisions of a tract or parcel of land into two or more lots, building sites, or other divisions, or parcels less than five acres, for the purpose, whether immediate or future, of sale, legacy, or building development, or includes all division of land involving a new street or a change in existing streets, and includes re-subdivision Revised Apr 2023 11 and, where appropriate, in the context, shall relate to the process of subdividing or to the land or area subdivides. (55) Surface water - includes waters upon the surface of the earth in bounds created naturally or artificially including, but not limited to, streams, other watercourses, lakes, and reservoirs. (56) SWMP – stormwater management plan see number 45. (57) TIER B land surveyor - includes all rights and privileges of the TIER A land boundary surveying discipline defined in South Carolina Code of Laws Section 40-22-20(23)(a); and in addition to these rights and privileges, TIER B land surveying includes, for subdivisions, preparing and furnishing subdivision plans for sedimentation and erosion control and storm drainage systems, if the systems do not require the structural design of system components and are restricted to the use, where relevant, of any standards prescribed by local, state, or federal authorities. Regulations defining the scope of the additional powers granted to TIER B land surveyors must be promulgated by the board. (58) Top of Bank - describes the highest point of the bank of a stream, river, or waterbody. It is the point where the bank meets the adjacent upland or terrace, and is typically the boundary between the land and the stream channel. (59) Watercourse - a permanent or intermittent stream or other body of water, either natural or man-made, that gathers or carries surface water. (60) Watershed - all the land area that contributes runoff to a particular point along a waterway. (61) Waters of the South Carolina, or Waters of the State - lakes, bays, sounds, ponds, wetlands, impounding reservoirs, springs, wells, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Atlantic Ocean within the territorial limits of the State, and all other bodies of surface or underground water, natural or artificial, public or private, inland or coastal, fresh or salt, which are wholly or partially within or bordering the State or within its jurisdiction, and all waters of the United States within the political boundaries of the State of South Carolina. Waste treatment systems, including treatment ponds or lagoons designed to meet the requirements of CWA are not waters of the South Carolina. This exclusion applies only to manmade bodies of water which Revised Apr 2023 12 neither was originally created in waters of South Carolina (such as disposal areas in wetlands) nor resulted from the impoundment of waters of South Carolina. (62) Waters of the United States, or Waters of the U.S.: - i. All waters, which are currently used, were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waterswater, which are subject to the ebb and flow of the tide; ii. All interstate waters, including interstate “wetlands’; iii. All other waters such as interstate lakes, rivers, streams (including intermittent streams), mudflats, sand flats, wetlands, sloughs, wet meadows, or natural ponds, the use, degradation, or destruction of which would affect or could affect interstate or foreign commerce including any such waters: iv. All impoundments of waters otherwise defined as waters of South Carolina under this definition; v. Tributaries of waters identified in paragraphs (a) through (d) of this definition; vi. The territorial sea; and vii. Wetlands adjacent to waters (other than waterswater that areis themselves wetlands) identified in paragraphs (a) through (f) of this definition. (63) Wetlands those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstance do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Revised Apr 2023 13 Section 2 General pProvisions. 2 (a) Purpose. It is the purpose of this ordinance to: (1) Protect, maintain, and enhance the environment of Pickens County and the public health, safety, and the general welfare by establishing minimum requirements and procedures to control the adverse effects of increased stormwater runoff associated with both future land development and existing developed land within the CountyPickens County. Proper management of stormwater runoff will minimize damage to public and private property, ensure a functional drainage system, reduce the effects of development on land and stream channel erosion, assist in the attainment and maintenance of water quality standards, enhance the local environment associated with the drainage system, reduce local flooding, maintain as nearly as possible the pre-developed runoff characteristics of the area, and facilitate economic development while mitigating associated flooding and drainage impacts. 2 (b) Objectives. The objectives of this ordinance include the following: (1) Protect, maintain, and enhance the short-term and long-term public health, safety, and general welfare. This objective will be achieved by: a. Establishing minimum requirements and procedures to control the adverse effects of increased stormwater runoff associated with both future land development and existing developed land within the Ccounty; b. Providing proper management of stormwater runoff to minimize damage to public and private property and reduce the effects of land disturbing activities on land and stream channel erosion; c. Protecting, preserving, and enhancing water quality and fish and wildlife habitat within the Ccounty and in downstream receiving waters; and d. Alleviate street and property flooding and its adverse impacts caused by urban development. (2) Comply with state and federal (EPA) stormwater regulations developed pursuant to the Clean Water Act. These requirements include: Revised Apr 2023 14 a. Control pollutants from stormwater discharges associated with commercial and industrial activity and the quality of stormwater discharge from residential, commercial, and industrial developments; b. Prohibit illicit connections to the stormwater drainage system; c. Control discharges to the stormwater drainage system from spills and dumping or disposal of materials other than stormwater; and d. Allow Pickens County to exercise the powers granted in South Carolina Stormwater Management and Sediment Reduction Regulations 72-300, that provides, among other powers Pickens County has with respect to stormwater facilities, the power by ordinance or resolution to: 1. Exercise general regulation over the planning, location, construction, and operation and maintenance of stormwater facilities in the Ccounty, whether or not owned and operated by the Ccounty; 2. Adopt any rules and regulations deemed necessary to accomplish the purposes of this statute, including the adoption of a system of fees for services and permits; 3. Establish standards to regulate the quantity of stormwater discharged and to regulate stormwater contaminants as may be necessary to protect water quality; 4. Review and approve plans and plats for stormwater management in proposed new developments; 5. Issue permits for stormwater discharges, or for the construction, alteration, extension, or repair of stormwater facilities; 6. Suspend or revoke permits when it is determined that the permittee has violated any applicable ordinance, resolution, or condition of the permit; 7. Regulate and prohibit discharges into stormwater facilities of sanitary, industrial, or commercial sewage or waters that Revised Apr 2023 15 have otherwise been contaminated. Section 3 Submittal Requirements. 3 (a) Sites with less than one disturbed acre unless otherwise exempt. Land disturbing activities that disturb less than one acre of land, and are NOT part of a larger common plan of development or sale that will ultimately disturb one acre, areis not required to apply for a land disturbing permit. 3 (b) Sites with gGreater than oOne dDisturbed aAcre. Land disturbing activities that disturb one acre or greater iares required to apply for a land disturbing permit. Each application for land disturbing activities of one acre or greater, or less than one acre if it is part of a larger common plan for development or sale that would ultimately disturb one acre, shall be accompanied by:  A Stormwater Management Plan (SWMP) providing for stormwater management during the land disturbing activity and after the activity has been completed.  A Sediment and Erosion Control Plan. Professionally certified site plans, sediment and erosion control plans, specifications, supporting calculations, and computations shall be submitted, stamped, and sealed by a professionally licensed engineer, landscape architect, or Tier B land surveyor. Section 4 Scope. (1) The provisions of this ordinance shall apply throughout the unincorporated areas in Pickens County. No person shall conduct any land disturbing activities without having provided for appropriate stormwater management measures that control or manage runoff, in compliance with this ordinance, unless exempted in Section 5(c)5.3. (2) No person shall conduct any land disturbing activities without having provided for appropriate stormwater management measures that control or manage runoff, in compliance with this ordinance, unless exempted in Section 5(c). The provisions of this ordinance shall apply throughout the unincorporated areas in Pickens County. and in the city limits of Pickens and Liberty. (3) The Pickens County Stormwater Design Manual shall give guidance to persons preparing stormwater management and sediment control plans, and designing or operating stormwater management systems. Revised Apr 2023 16 (4) The application of this ordinance and the provisions expressed herein shall be the minimum stormwater management requirements and shall not be deemed a limitation or repeal of any other local requirements. Where other requirements are more stringent, those shall apply. This ordinance does not eliminate the necessity for obtaining other permits as may be required by other government entities. Section 5 Land dDisturbance Ppermits.. 5 (a) Requirements. All land disturbing activities of one acre or greater, or less than one acre if it is part of a larger common plan for development or sale that would ultimately disturb one acre, will be required to obtain a land disturbance permit from the Pickens County Office of Stormwater Management. Each application for a land disturbance permit shall be accompanied by payment for plan review, NPDES permit fee, and any other stormwater management fees that may apply, which shall be set by resolution. 5 (b) Building permit. No building permit shall be issued until the applicant has obtained a land disturbance permit where the same is required by this ordinance. 5 (c) Exemptions. The following activities are exempt from the permit requirement but they are not exempt under the provisions of the Clean Water Act: (1) Any emergency activity that is immediately necessary for the protection of life, property, or natural resources. (2) Existing nursery and agricultural operations conducted as a permitted main or accessory use. (3) Logging activities on forestland for the production and harvesting of timber and timber products. (4) Agricultural land for the production of plants and animals useful to man. (5) Construction or improvement of a single-family residence (single family residence separately built) or their accessory buildings, or mobile home, that is separately built and not part of multiple construction or a larger common plan subdivision developmentdevelopments approved under this ordinance. If included in a subdivision Revised Apr 2023 17 plan, all land disturbing activities must follow the stormwater management and sediment control plan that has been approved for the subdivision. (6) Minor land disturbing activities that do not disturb one acre or greater of land area. (7) Any maintenance or renovation of an existing structure or system not materially changing or affecting the rate, concentration, or volume of stormwater runoff. 5 (d) Review and approval of application. (1) Pickens County will review each application for a land disturbance permit to determine its conformance with the provisions of this ordinance, the South Carolina NPDES General Permit for Storm Water Discharges From Large and Small Construction Activities, and Pickens County’s NPDES General Permit for Storm Water Discharges From Regulated Small Municipal Separate Storm Sewer Systems (MS4s). For land disturbing activities of one acre or greater, or less than one acre if it is part of a larger common plan of development or sale that will ultimately disturb one acre, within twenty (20) businesscalendar days after receiving an application, Pickens County shall provide one of the following responses in writing:  Approval of the permit application;  Denial of the permit application, indicating the reason(s) for the denial. (2) No development plans will be released until the land disturbance permit has been approved. 5 (e) Permit duration. Every land disturbance permit shall expire and become null and void if substantial work authorized by such permit has not commenced within one hundred eighty (180) calendar days of issuance. Extensions or renewals of the plan approvals may be requested by written request by the person responsible for the land disturbing activity. The permit expires in five years from the date of issuance. 5 (f) Notice of construction. The applicant must notify Pickens County at least three (3) working days in advance of the commencement of construction. 5 (g) Construction and iInspections. (1) Prior to the approval of the stormwater management and sediment control plan, the Revised Apr 2023 18 applicant shall submit a construction and inspection schedule. proposed staged construction and inspection control schedule. (2) The applicant shall notify the Pickens County Office of Stormwater Management Stormwater Office before commencing any work to implement the stormwater management anda sediment control plan and upon completion of the work. (3) The staff of the Pickens County Office of Stormwater Management Pickens County Stormwater Office shall conduct periodic inspections of the stormwater management system construction. Construction inspections shall utilize the approved stormwater management plan for establishing compliance. All inspections shall be documented with written reports that contain the following information: a. The date and location of the inspection; b. Whether construction is in compliance with the approved stormwater management plan; c. Variations from the approved construction specifications; and, d. Any other variations or violations of the conditions of the approved stormwater management plan. If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. The Pickens County Office of Stormwater Management Stormwater Office shall maintain a file of records of inspection reports and provide copies of all inspection reports to the applicant. (4) Any area of land from which the natural vegetative cover has been either partially or wholly cleared by development activities shall be re-vegetated according to a schedule approved by Pickens County. 5 (h) Final iInspection and aAs Bbuilt pPlans. Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual “as built” plans for any stormwater management facilities or practices after final construction is completed any structural BMP designed to control water quality or quantity. The plan must show the final design specifications for all stormwater Revised Apr 2023 19 management facilities and practicesstructural BMPs and must be certified by a Professional Engineer, Landscape Architect, or Tier B Land Surveyor. The registered professional shall state that: (1) The facilities have been constructed as shown on the “as-built” plan; and (2) The facilities meet the approved stormwater management and sediment control plans and specificationsspecification or achieve the function for which they were designed. A final inspection shall be conducted by the Pickens County Office of Stormwater Management Stormwater Office upon completion of the work included in the approved stormwater management and sediment control plan to determine if the completed work is constructed in accordance with the plan. No stage work, related to the construction of stormwater management facilities and BMPs, shall proceed until the next preceding stage of work, according to the sequence specified in the approved stated construction and inspection control schedule, is inspected and approved. Section 6 Maintenance. 6 (a) Responsibility. All temporary and permanent on-site stormwater management facilities and Best Management Practices (BMPs) required by this ordinance shall be maintained by the owner during and after site development. The owner shall provide adequate ingress and egress for Ccounty personnel to inspect the premises at reasonable times. Pickens County Stormwater pPersonnel will conduct periodic inspections of all stormwater management facilities at a minimum of once per 5 year periodcalendar year. 6 (b) Failure to maintain. Should the owner fail to properly maintain the drainage system, stormwater management facilities, and Best Management Practices as required by this ordinance, Pickens County shall give written notice to the owner of record as appears on the latest property tax record, by certified mail, of the nature of the violation and the corrective action necessary. Should the owner fail, within fifteen (15) working days from the date of notice, to take corrective action to the satisfaction of Pickens County Office of Stormwater Management or appeal the notice, Revised Apr 2023 20 the Ccounty may enter upon the lands, take corrective action as the County may deem necessary, and place a lien on the property owner for the costs thereof. Section 7 Ongoing Inspection and Maintenance of Stormwater Facilities and Practices. Stormwater management facilities and practices included in a stormwater management plan which are subject to an inspection and maintenance agreement must undergo ongoing periodic inspections to document maintenance and repair needs and ensure compliance with the requirements of the agreement, the plan, and this ordinance. The responsible person, in accordance with the approved inspection and maintenance agreement, shall inspect a stormwater management facility or practice on a periodic basis. In the event that the stormwater management facility has not been maintained and/or becomes a danger to public safety or public health, Pickens County shall notify the person responsible as specified in the inspection and maintenance agreement of the deficiency. The notice shall specify the measures needed to comply with the maintenance agreement and shall specify the time within which such measures shall be completed. If the responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, Pickens County, may correct the violation as provided in Section 6(b)6.B hereof. Inspection programs by Pickens County may be established on any reasonable basis, including but not limited to: routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in stormwater management facilities; and evaluating the condition of stormwater management facilities and practices. Section 8 Waivers and Variance. 8 (a) General information. If the 2- and 10-year frequency, 24-hour duration storm event post-developed flow rates exceed the pre-developed rates, a waiver from detention may bemaybe granted in accordance with State regulation 72-302(B) and Pickens County Stormwater Ordinance this ordinance, on a case-by-case basis. Every applicant shall provide for stormwater management as required by Revised Apr 2023 21 this ordinance, unless justification and a written request are filed to waive this requirement. Pickens County may grant waivers from the stormwater management requirements for individual land disturbing activities provided that a written request is submitted by the applicant containing descriptions, drawings, and any other information that is necessary to evaluate the proposed land disturbing activity. A separate written waiver request shall be required if there are subsequent additions, extensions, or modifications which would alter the approved stormwater runoff characteristics to a land disturbing activity receiving a waiver. Requests to waive the stormwater management plan requirements shall be submitted to Pickens County Stormwater staff for approval. 8 (b) Conditions for waiver. The minimum requirements for stormwater management may be waived in whole or in part upon written request of the applicant, provided that at least one of the following conditions applies: (1) A project may be eligible for a waiver of stormwater management for both quantitative and qualitative control if the applicant can demonstrate that the proposed project will return the disturbed area to a pre-development runoff condition and the pre-development land use is unchanged at the conclusion of the project. (2) A project may be eligible for a waiver or variance of stormwater management for water quantity control if the applicant can demonstrate that: a. The proposed project will have no significant adverse impact on the receiving natural waterway or downstream properties; or b. The imposition of peak control requirements for rates of stormwater runoff would aggravate downstream flooding; or c. It can be demonstrated that the proposed development is not likely to impair attainment of the objectives of this ordinance. d. Alternative minimum requirements for on-site management of stormwater discharges have been established in a stormwater management plan that has been approved by the Pickens County Stormwater Department. (3) Justification and a written request must be submitted, including the following statement: “the increased flows will not have a significant adverse impact on the Revised Apr 2023 22 downstream/adjacent properties”.” must be submitted with the request. (4) The project’s Professional Engineer must sign the waiver request and a variance application must be submitted to the Pickens County Office of Stormwater ManagementStormwater Office. 8 (c) Downstream damage, etc. prohibited. In order to receive a waiver, the applicant must demonstrate to the satisfaction of the Pickens County Stormwater Department that the waiver will not lead to any of the following conditions downstream: (1) Deterioration of existing culverts, bridges, dams, and other structures; (2) Degradation of aquatic ecosystem or habitat; (3) Accelerated stream bank or streambed erosion or sedimentation; (4) Increased threat of flood damage to public health, life or property. 8 (d) Land disturbance permit not to be issued where waiver requested. No land disturbance permit shall be issued where a waiver has been requested until the waiver is granted or denied. If no waiver is granted, the plans must be resubmitted with a stormwater management plan. 8 (e) Variance. Pickens County may grant a written variance from any requirement of this ordinance if there are exceptional circumstances applicable to the site such that strict adherence to the provisions of these regulations will result in unnecessary hardship and not fulfill the intent of this ordinance. A written request for variance shall be provided to Pickens County and shall state the specific variances sought and the reasons, with supporting data, for their granting. A variance shall not be granted unless and until sufficient specific reasons justifying the variance are providedprovide by the applicant. Section 9 Permit Procedures and Requirements. 9 (a) Stormwater dDesign and/or BMP Manual. To assist in the design and evaluation of stormwater management facilities in the countyCounty, a Stormwater Design Manual has been developed. Design procedures and criteria are presented for conducting hydrologic and hydraulic evaluation and evaluation of Best Management Practices (BMPs). Although the intention of the manual is to establish Revised Apr 2023 23 uniform design practices, it neither replaces the need for engineering judgment nor precludes the use of information not presented. Other accepted engineering procedures may be used to conduct hydrologic and hydraulic studies if approved by the Ccounty. The Ccounty adopts the Stormwater Design Manual by reference in this ordinance. The Pickens County Stormwater Design Manual will be reviewed and updated as necessary. Contact the Pickens County Office of Stormwater ManagementPickens County Stormwater Management Office, or the Pickens County website at: www.co.pickens.sc.us, for information on how to obtain the Stormwater Design Manual. 9 (b) General performance criteria for stormwater management. No owner or developer shall perform any land development activities without first meeting the requirements of this ordinance prior to commencing the proposed activity. Unless granted a waiver or variance by Pickens County, or unless specifically exempted by this ordinance, the following performance criteria shall be addressed for stormwater management at all sites: (1) All site designs shall control the peak flow rates of stormwater discharge associated with design storms specified in this ordinance or in the Stormwater Design Manual and reduce the generation of post-construction stormwater runoff to pre-construction levels. These practices should seek to utilize pervious areas for stormwater treatment and to infiltrate stormwater runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practical to provide treatment for both water quality and quantity. Low-impact Development (LID) development is encouraged. (2) To protect stream channels from degradation, specific channel protection criteria as prescribed in the Stormwater Design Manual or the DHEC Stormwater BMP Handbook, shall be met. (3) Stormwater discharges to critical areas with sensitive resources (i.e., cold water fisheries, swimming beaches, recharge areas, water supply reservoirs) may be subject to additional performance criteria, or may need to utilize or restrict certain stormwater management practices. (4) Stormwater that discharges from or to any hot spots may require the application of specific structural BMP’s and pollution prevention practices. Revised Apr 2023 24 9 (c) Minimum control requirements. (1) Stormwater designs shall meet the multi-stage storm frequency storage requirements as identified in the Stormwater Design Manual. (2) If hydrologic or topographic conditions warrant greater control than that provided by the minimum control requirements, Pickens County may impose any and all additional requirements deemed necessary to control the volume, timing, and rate of runoff. Section 10 Stormwater Management Plan Requirements. The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this ordinance, including the performance criteria set forth in Section 9(b).2 above. Additionally, the stormwater management plan shall provide details for Pickens County Office of Stormwater Management Pickens County Stormwater Office to evaluate the environmental characteristics of the project site, the potential impacts of all proposed development of the site, both present and future, on the water resources, and the effectiveness and acceptability of the measures proposed for managing stormwater generated at the project site. The plan must show the final design specifications for all stormwater management facilities and must be sealed by a qualified individual who is licensed as follows: (1) Registered professional engineer licensed to practice in South Carolina, (2) Registered landscape architect, or (3) Tier B land surveyors, as described by South Carolina Code of Laws, Title 40. The stormwater management plan must ensure that the requirements and criteria in the ordinance are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the development. The plans shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the Stormwater Management Site Plan checklist found in the Stormwater Design Manual. This includes:  Name of Applicant  Business or residence address of applicant  Name, address and telephone number of the owner of the property Revised Apr 2023 25  Address and legal description of subject property  Name, address and telephone number of the contractor and any subcontractor(s)  Vicinity map  Landscaping Plan  Maintenance Easements  Maintenance Inspection and Agreement  Sediment and Erosion Control Plans  All other appropriate state or federal environmental permits (i.e. Septic tank permit)  Post-Development Hydrologic Analysis  Stormwater Management System See the latest edition of the Pickens County Stormwater Design Manual for a complete description of each requirement. Section 11 Sediment and Erosion Control Plan Requirements. The sediment and erosion control plan shall accurately describe the potential for soil erosion and sedimentation problems likely to result from the land disturbing activity, and shall explain and illustrate the measures that areis to be taken to control these problems. The plan shall conform to the requirements found in the Stormwater Design Manual and shall include the following:  Project Description  A topographic map  All existing drainage ways  A general description of existing land cover  Stands of existing trees, as they are to be preserved upon project completion  Approximate limits of proposed clearing, grading, and filling  Approximate flows of existing stormwater leaving any portion of the site  A general description of existing soil types  Location, size, and layout of proposed stormwater and sedimentation control improvements Revised Apr 2023 26  Proposed drainage network  Proposed drain tile or waterway sizes  Approximate flows leaving site after construction  The projected sequence of work  Specific remediation measures to prevent erosion and sedimentation run-off  Specific details for the construction of rock pads and wash down pads  Proposed structure location (to the extent possible) See the latest edition of the Pickens County Stormwater Design Manual for a complete description of each requirement. Section 12 Water Quality. Permanent water quality must be addressed on all projects or larger common plans of development that disturbs five (5)one (1) or more acres. 12 (a) Treatment. All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if: (1) It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Stormwater Design Manual or the DHEC Stormwater BMP Handbook; (2) Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Stormwater Design Manual or the DHEC Stormwater BMP Handbook; and, (3) Runoff to or from hotspot land uses and activities identified by Pickens County are adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices, and pollution prevention practices. 12 (b) Stream cChannel pProtection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using the following approaches: (1) Preservation, restoration, and/or reforestation (with native vegetation) of the applicable stream buffer setback; (2) Erosion prevention measures such as energy dissipation and velocity control. (3) Waters of the U.S./State are not used for permanent water quality control (alternative Revised Apr 2023 27 means of treatment must be used if an existing pond is to be used for water quantity control.) 12 (c) Structural sStormwater cControls. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Stormwater Design Manual or the DHEC Stormwater BMP Handbook. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Pickens County Stormwater Design Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from Pickens County before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, Pickens County may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question. Applicants should consult the Stormwater Design Manual or the DHEC Stormwater BMP Handbook for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control. 12 (d) Drainage sSystem Gguidelines. Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining project sites and/or public right-of- ways. Stormwater conveyance facilities that are designed to carry runoff from more thanthat one parcel, existing or proposed, shall meet the following requirements: (1) Methods to calculate stormwater flows shall be in accordance with the Stormwater Design Manual or the DHEC Stormwater BMP Handbook (2) All culverts, pipe systems, and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the Stormwater Revised Apr 2023 28 Design Manual; and, (3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the Stormwater Design Manual. 12 (e) Dam dDesign gGuidelines. Any land disturbing activity that involves a site, which proposes a dam, shall comply with the South Carolina Safe Dams Act and Rules for Dam Safety as applicable. Section 13 Existing Llocations and Ddevelopments. 13 (a) Requirements for all existing locations and developments. The following requirements shall apply to all locations and developmentsdevelopment at which land disturbing activities have occurred previous to the enactment of this ordinance: (1) Denuded areas must be vegetated or covered under the standards and guidelines specified in the Stormwater Design Manual and on a schedule acceptable to Pickens County (2) Cuts and slopes must be properly covered with appropriate vegetation and/or retaining walls constructed. (3) Drainage ways shall be properly covered in vegetation or secured with riprap, channel lining, etc., to prevent erosion. (4) Trash, junk, rubbish, etc. shall be cleared from drainage ways. (5) Stormwater runoff shall be controlled to the maximum extent practical to prevent pollution of local waters. 13 (b) Requirements for existing problem locations. Pickens County shall in person or in writing notify the owners of existing locations and developments of specific drainage, erosion, or sediment problemsproblem affecting such locations and developments, and the specific actions required to correct those problems. The notice shall also specify a reasonable time for compliance. 13 (c) Inspection of existing facilities. Pickens County may, to the extent authorized by state and federal law, establish inspection programs to verify that all stormwater management facilities, including those built before as well as after the adoption of this ordinance, are functioning within design limits. These inspection programs may be established on any reasonable basis, including but not limited to: routine inspections; random inspections; inspections based upon complaints or other notice of Revised Apr 2023 29 possible violations; inspection of drainage basins or areas identified as higher than typical sources of sediment or other contaminants or pollutants; inspections of businesses or industries associated with higher than usual discharges of contaminants or pollutants or with discharges which are more likely than the typical discharge to cause violations of Pickens County ’s NPDES stormwater permit; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in drainage control facilities; and evaluating the condition of drainage control facilities and other BMP’s. 13 (d) Corrections of problems subject to appeal. Corrective measures imposed by Pickens County under this section are subject to appeal under Section 1918 of this ordinance. Section 14 Illicit Ddischarges.. 14 (a) Scope. This section shall apply to all water generated on developed or undeveloped land entering Pickens County’s separate storm sewer system. 14 (b) Prohibition of illicit discharges. It is unlawful for any person, company, corporation, etc., to throw, drain, run, or otherwise discharge to any component of the Ccounty’s stormwater system, including streets, highways, right-of-ways, or to cause, permit, or suffer to be thrown, drain, run, or allow to seep or otherwise discharge into such system, any organic or inorganic matter that shall cause or tend to cause pollution or blockages to such waters, as provided for in this ordinance. No person shall introduce or cause to be introduced into Pickens County’s storm sewer system any discharge that is not composed entirely of stormwater. The commencement, conduct, or continuance of any non-stormwater discharge to Pickens County’s separate storm sewer system is prohibited except as identified in the Stormwater Design Manual. (1) Except discharges specified in writing by Pickens County as being necessary to protect public health and safety. (2) In the event of an accidental discharge to the Ccounty drainage system of any material or substance other than stormwater runoff, the person concerned shall inform the Pickens County Stormwater Department immediately of the nature, Revised Apr 2023 30 quantity, and time of occurrence of the discharge. The person concerned shall take immediate steps to contain, treat, or take other actions to minimize the effects of the discharge on the Ccounty drainage system and receiving streams. The person shall take immediate steps to ensure no recurrence of the discharge. 14 (c) Prohibition of illicit connections. (1) It is unlawful for any person, company, corporation, etc, to connect any pipe, open channel, or any other conveyance system to the Ccounty drainage system that discharges anything except stormwater discharge that are identified on the approved stormwater management and sediment control plan. (2) Improper connections in violation of this ordinance must be disconnected and redirected to an acceptable outlet as approved by Pickens County Office of Stormwater ManagementPickens County Stormwater Office. (3) This prohibition expressly includes, without limitation, illicit connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection. 14 (d) Reduction of stormwater pollutants by the use of Best Management Practices. Any person responsible for a property or premises, which is, or may be, the source of an illicit discharge, may be required to implement, at the person's expense, the BMP’s necessary to prevent the further discharge of pollutants to the separate storm sewer system. Compliance with all terms and conditions of a valid NPDES permit authorizing the discharge of stormwater associated with industrial activity, to the extent practicable, shall be deemed compliance with the provisions of this section. Section 15 Riparian Setbacks. 15 (a) Findings. Pickens County finds that setbacks adjacent to waterbodies provide numerous benefits including: (1) Protecting, restoring, and maintaining the chemical, physical, and biological integrity of streams and their water resources (2) Removing pollutants delivered in urban stormwater (3) Reducing erosion and controlling sedimentation Revised Apr 2023 31 (4) Protecting and stabilizing banks (5) Providing for infiltration of stormwater runoff (6) Reducing flood impacts by absorbing peak flows, slowing the velocity of floodwaters, and regulating base flow (7) Contributing organic matter that is a source of food and energy for the aquatic ecosystem (8) Providing tree canopy to shade waters and promote desirable aquatic habitat (9) Providing riparian wildlife habitat (10) Furnishing scenic value and recreational opportunity (11) Minimizing encroachment on stream channels and reducing the need for costly engineering solutions such as dams and riprap, to protect structures and reduce property damage and threats to the safety of watershed residents (12) Providing opportunities for the protection and restoration of greenspace 15 (b) Purpose. It is the purpose of this section to protect the public health, safety, environment, and general welfare; to minimize public and private losses due to erosion, siltation, and water pollution; and to maintain stream water quality by provisions designed to: (1) Create riparian setbacks along Waters of the State of Pickens County for the protection of water resources; and, (2) Minimize land disturbing activities within such setbacks by establishing riparian setback requirements. 15 (c) Pre-existing non-conforming structures or uses. This ordinance shall not apply to the following pre-existing activities or uses: (1) A non-conforming use, existing at the time of passage of this regulation and within a riparian setback, that is not permitted under this regulation may be continued but shall not be changed or enlarged unless changed to a use permitted under this regulation. (2) A non-conforming structure, existing at the time of passage of this regulation and within a riparian setback, that is not permitted under this regulation may be continued but shall not have the existing building footprint or roofline expanded or enlarged. (3) A residential structure or use within the Riparian Setback existing at the time of passage of these regulations may be expanded subject to the following: Revised Apr 2023 32 a. The expansion conforms to existing regulations. b. The expansion must not impact the stream channel or the 100-year floodplain. c. The expansion must not exceed an area of 15% of the footprint of the existing structure or use that lies within the Riparian Setback. (4) Work consisting of the repair or maintenance of any lawful use of land that is approved for use on or before the effective date of this ordinance. (5) Existing development and on-going land disturbance activities including but not limited to existing agriculture, silviculture, landscaping, except that new development or land disturbance activities on such properties will be subject to all applicable setback requirements. (6) Any land development activity that is under construction, fully approved for development, scheduled for permit approval or has been submitted for approval as of the effective date of this ordinance. (7) Land development activity that has not been submitted for approval, but that is part of a larger master development plan, such as for an office park or other phased development that has been previously approved within two years of the effective date of this ordinance. 15 (d) Exemptions. (1) Man-made ponds, lakes, and ditches which are outside natural hydrologic connectivity including ponds and lakes created for animal water, irrigation, other agricultural uses, stormwater, or recreation. (2) Any emergency activity that is immediately necessary for the protection of life, property, or natural resources. (3) When a landowner or other affected party believes that the records referenced in Section 15(e) have inaccurately depicted surface waters, he or she shall consult Pickens County. Upon request, Pickens County, a delegated local authority, or qualified individual shall make an on-site determination consistent with the U.S. Army Corps of Engineers and SCDHEC's Water Classifications and Standards. Revised Apr 2023 33 15 (e) Riparian setback requirements. This Riparian Setback shall apply to all property containing Waters of the State within the unincorporated areas of Pickens County. Waters addressed by this section are those which meet the definition of Waters of the State and are indicated on at least one of the following records: (1) Pickens County GIS Map (2) USGS topographical map (3) USDA, NRCS Soils Maps located in the Soil Survey for Pickens County, South Carolina (4) National Wetlands Inventory Map (5) A Stormwater Management Plan and/or Sediment and Erosion Control Plan as provided in Section 3(b) Widths of the setbacks are measured as horizontal map distance outward from the top of bank, and are established as follows: (1) A minimum of 50 feet on each side of all Waters of the State. (2) A minimum of 100 feet on all Outstanding Natural Resource Waters, Outstanding Resource Waters, and Natural Trout Waters as recognized by Regulation 61-68 Water Classifications and Standards. (3) Where the 100-year floodplain is wider than the Riparian Setback on either of both sides of Waters of the State, the Riparian Setback shall be extended to the outer edge of the 100-year floodplain. 15 (f) Uses permitted in the riparian setback. (1) The following uses are permitted within the Riparian Setback without prior approval. Except as otherwise provided in these regulations, the Riparian Setback shall be preserved in its natural state. a. Recreational activity. Recreational uses such as hiking, non -motorized bicycling, fishing, hunting, picnicking and similar uses and associated structures including boardwalks, pathways constructed of pervious material, foot trails, picnic tables, and wildlife viewing areas are allowed. b. Removal of damaged or diseased trees. Damaged or diseased trees may be removed. Because of the potential for felled logs and branches to damage downstream Revised Apr 2023 34 properties and/or block ditches or otherwise exacerbate flooding, logs and branches resulting from the removal of damaged or diseased trees that are greater than 6 inches in diameter, shall be anchored to the shore or removed from the 100-year floodplain. c. Removal of noxious or invasive vegetation is allowed. d. Revegetation and/or reforestation. The revegetation and/or refo restation of the Riparian Setback shall be allowed. A diverse mix of native plants and unmanaged (uncut below 12 inches and untreated) native grasses are the preferred vegetation where available and suited to the site. e. Stream bank stabilization/erosion con trol measures. Best Management Practices (BMPs) for stream bank stabilization or erosion control may be allowed if such practices are within permitted uses and are ecologically compatible and emphasize the use of natural materials and native plant species where practical and available. f. Access. Intrusions necessary to provide access to a property when no other feasible or prudent alternative exist. (2) In addition to 15(f)(1) above, the following uses are permitted by right within the Riparian Setbacks with prior approval of the design by Stormwater staff. a. Stream crossings, when no other feasible or prudent alternatives exist, such that the angle of any crossing shall be perpendicular to the stream or buffer to minimize clearing requirements; such that a single-span stream crossing shall be used wherever possible; and such that the right-of-way shall be the minimum width needed to allow for maintenance access and installation, are permitted by conditional use: i. Driveways serving 1 or 2 single-family detached dwelling units. ii. The minimum number of road crossings should be used within each subdivision. iii. Agricultural crossings by farm vehicles and livestock. iv. Recreation trails of pervious material, railroads, and sewer, water or utility lines. b. Structures which, by their nature, cannot be located anywhere except within the riparian buffer area. These structures include docks, boat launches, public water Revised Apr 2023 35 supply intake structures, utilities, facilities for natural water quality treatment and purification, and public wastewater treatment plant sewer lines and outfalls. However, such structures should provide for the minimum practicable disturbance of the riparian buffer area by minimizing size and location. 15 (g) Uses prohibited in the riparian setback. The following uses are specifically prohibited within the Riparian Setback: (1) Construction. There shall be no structures of any kind, except as permitted under these regulations. (2) Land Disturbance. There shall be no land disturbing activity of any kind, except as permitted under these regulations. (3) Dredging or Dumping. There shall be no filling or dredging of soil, spoils, or any material, natural or man-made, except as permitted under these regulations. (4) Roads or Driveways. There shall be no roads or driveways, except as permitted under these regulations. (5) Modification of Natural Vegetation. Modification of the natural vegetation shall be limited to conservation maintenance that the landowner deems necessary to control noxious or invasive vegetation; for su ch plantings as are consistent with these regulations; for such disturbances as are approved under these regulations; and for the passive enjoyment, access and maintenance of landscaping or lawns existing at the time of passage of these regulations. Nothing in this section shall be construed as requiring a landowner to plant or undertake any other activities in the Riparian Setback provided the landowner allows for natural succession. (6) Impervious Cover. There shall be no human made impervious cove r, in cluding but not limited to parking lots, sidewalks, and rooftops, except as permitted under these regulations. Section 1615 Right of Entry. (1) Pickens County shall have the right of entry on or upon the property of any person subject to this article and any permit/document issued hereunder. (2) Where a person has security measures in force requiring proper identification and Revised Apr 2023 36 clearance before entry onto the premises, the person shall make necessary arrangements with security guards so that, upon presentation of suitable identification, Pickens County Personnel will be permitted to enter without delay. (3) Pickens Countycounty shall have the right to set up on the person’s property such devices as are necessary to conduct sampling and/or metering of the person’s operations as they relate to stormwater management. (4) In cases where an imminent threat to the health or safety of the general public or the environment is suspected, Pickens County shall inspect existing stormwater management facilities to determine if immediate action is necessary. Such inspection shall be made with or without the consent of the owner, manager, or signatory official. If such consent is refused, Pickens County may seek issuance of an administrative search warrant. Section 1716 Pickens County Stormwater Board. The Pickens County Stormwater Board shall function as an appeals board to the County Stormwater Program and shall be composed of six members who shall be resident electors of the Ccounty and who shall continue to serve as members of this board for their specified terms of appointment and until a successor is appointed. In the original appointments, four shall be appointed for terms of two years and two for terms of four years. Upon the termination of the original terms, the County Councilcounty council shall appoint their successors for terms of four years, one member being nominated by each of the six council members. Section 1817 Violations, Enforcement, and Penalties. 1817 (a) Violations. It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of this Oordinance. Any person who has violated or continues to violate the provisions of this ordinance, may be subject to the enforcement actions outlined in this section or may be restrained by injunction or otherwise abated in a manner provided by law. In the event the violation constitutes an immediate danger to public health or public safety, Pickens County Personnel areis authorized to enter upon the subject private property, without giving prior notice, to take any and all measures necessary to abate the violation and/or restore property. Pickens County is then authorized to seek costs of the abatement as outlined Revised Apr 2023 37 in Section 6 (b).B. (1) Notice of Violation. Whenever Pickens County finds that any permittee or any other person discharging stormwater has violated or is violating this ordinance, or a permit, or order issued hereunder, Pickens County may serve upon such person written notice of the violation. Within seven (7) working days of this notice, an explanation of the violation and a plan for the satisfactory correction and prevention thereofthere of, to include specific required actions, shall be submitted to the Stormwater Manager. Submission of this plan in no way relieves the discharger of liability for any violations occurring before or after receipt of the notice of violation. The notice shall contain: a. The name and address of the owner, or the applicant, or the responsible person; b. The address when available, or a description of the building, structure, or land upon which the violation is occurring, or has occurred; c. A statement specifying the nature of the violation; d. A description of the remedial measures necessary to restore compliance with this ordinance and a time schedule for the completion of such remedial action; e. A statement of the penalty or penalties that shall or may be assessed against the person to whom the notice of violation is directed; and, f. A statement that the determination of violation may be appealed to the Pickens County Stormwater Board by filing a written notice of appeal within fifteen (15) days of service of notice of violation. 1817 (b) Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, the Pickens County Office of Stormwater Management shall first notify the applicant or other responsible person in writing of its intended action, and shall provide seven (7) working days (except in the event the violation constitutes an immediate Revised Apr 2023 38 danger to public health or public safety, 24 hours notice shall be sufficient) to cure such violation. In the event the applicant or the responsible person fails to cure such a violation after such notice and cure period, Pickens County may take any one or more of the following actions or impose any one or more of the following penalties. (1) Stop Work Order – Pickens County may issue a stop work order, which shall be served on the applicant or other responsible person. The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take the necessary remedial measures to cure such violation or violations. Initiation of land disturbing activity w ithout obtaining a stormwater permit, unless otherwise exempt, will be issued a stop work order until such permit is obtained. (2) Withhold Certificate of Occupancy – Pickens County Building Codes may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein. (3) Suspension, Revocation or Modification of Permit – Pickens County may suspend, revoke, or modify the permit authorizing the land development project. A suspended, revoked, or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated [(upon such conditions as the countyCounty may deem necessary )] to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations. (4) Civil Penalties - In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of vi olation or otherwise fails to cure the violations described therein within ten days, or such greater period as Pickens County shall deem appropriate (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24- hours notice shall be sufficient) after the county has taken one or more of the actions described above, the Pickens County Office of Stormwater Revised Apr 2023 39 Management Pickens County Stormwater Office may impose a penalty not to exceed $1,000 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation. (5) Criminal Penalties - For intentional and flagrant violations of this ordinance, the Pickens County Office of Stormwater ManagementPickens County Stormwater Office may issue a citation to the applicant or other responsible person, requiring such person to appear in court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $500 or imprisonment for 30 days or both $1,000 or imprisonment for 60 days or both . Each act of violation and each day upon which any violation shall occur shall constitute a separate offense. Section 1918 Appeals. (1) Appeals may be taken to the Pickens Stormwater Board by any person aggrieved by any personnel, department, board, or bureau of the County. The appeal must be filed within 15 days of the grievous action, by filing a compliantcomplaint with the Pickens County Stormwater Board specifying the grounds of the appeal. (2) The Board shall within 45 days from the date of the appeal meet for the hearing of the appeal or other matter referred to the Bboard. At the hearing, any party may appear in person, by agent, or by attorney. (3) In exercising the above power, the Pickens County Stormwater Board may reverse or affirm, wholly or in part, or may modify the order, requirements, decision, or determination, and to that end shall have all the powers of the officer from whom the appeal is taken and may issue or direct the issuance of a permit. (4) The chairman or, in his or her absence, the acting chairman, may administer oaths and compel the attendance of witnesses by subpoena. The Board shall keep minutes of its proceedings, showing the vote of each member upon each question, or if absent or failing to vote, indicating that fact, and shall keep records of its examinations and other official actions, all of which must be public record. Section 2019 Severability. If a section, subsection, or part of this ordinance shall be deemed or found to conflict with a provision of South Carolina law, or other pre-emptive legal principle, then that section, Revised Apr 2023 40 subsection, or part of this ordinance shall be deemed ineffective, but the remaining parts of this ordinance shall remain in full force and effect. Whenever there is a conflict between any standard contained in this ordinance and in the Stormwater Design Manual adopted by Pickens County under this ordinance, the strictest standard shall prevail. Section 2120 Conflict with pPreceding Oordinance. If a section, subsection, or provision of this article shall conflict with the provisions of a section, subsection, or part ofor a preceding ordinance of the Ccounty, then the preceding section, subsection, or part shall be deemed repealed and no longer in effect. PROPOSED UDSO AMENDMENTS ITEM 10a – rv AS A DWELLING UNIT OVERVIEW There has been a high incident of people asking to live in a recreational vehicle or camper year -round as a permanent residence. The County standards do not allow for this. As a way to allow this use to continue it was determined that some standards needed to be established to keep the dwellings safe and to protect neighboring properties. PROPOSED TEXT AMENDMENTS TO ARTICLE 1 104 (g) Recreational Vehicle (RV) as a Private Dwelling 104 (1) Purpose: The purpose of this section is to provide standards for the parking and utilization of RV’s as a residential unit on private property. The purpose of this ordinance is to ensure that RV’s are properly sited with adequate vehicular access and adequate access to other public services while protecting the public health, safety, and welfare, 104 (2) Use Standards for RV’s as a private dwelling. (a) Each request to use an RV as a private dwelling shall require the applicant to complete and submit an application provided by the Building and Codes Department. This application must be approved prior to an RV being authorized as a private dwelling. (b) RV’s being utilized as a dwelling shall meet all the same standards for a traditional dwelling in regard to minimum lot sizes, street frontage, setbacks, and curb cuts. (c) RV’s shall count as a principal building in regard to Section 104(d) of the UDSO and only one RV shall be allowed per residential property (d) No RV can be parked within a FEMA designated Flood Plain or Flood Way. (e) 911 Addressing shall be applied for each RV. (f) Emergency Vehicle Access shall be provided. (g) Each RV must maintain registration through the Department of Motor Vehicles so that vehicles stay in a “mobile-ready” state. (h) Applicants shall sign an affidavit that the RV is free from dents, broken windows, loose parts, window AC units, leaks, or duct tape. (i) All RV’s must be anchored per American National Standards Institute (ANSI) standards for RV’s (j) Each RV must be connected to a public sewer system or DHEC approved septic system (k) Each RV must have its own power meter and power connection that has been inspected and approved per the International Residential Code (IRC). (l) RV’s shall be equipped with smoke alarms per IRC standards. (m) RV’s shall be added to the County Assessment/Tax system the same as Mobile Homes (by VIN) and shall be taxed separate from the land but still linked to the Parcel. (n) RV’s shall be subject to an annual inspection by the Building Codes Department to ensure adherence to all of the standards cited in 302(b). It is the responsibility of the RV owner to schedule this inspection annually. Sec. 1603 Definitions. Dwelling: A vehicle, structure, building or portion of a building arranged or designed to provide living facilities for one (1) or more persons including permanent or semi-permanent provisions for living, sleeping, eating, cooking, and sanitation. PROPOSED UDSO AMENDMENTS ITEM 10B – Rv parks OVERVIEW In the process of making general updates to the UDSO, Council requested that the minimum acreage of an RV park or campground be changed from a minimum of 2-acres to a minimum of 5-acres. This was determined to be a more reasonable size for a legitimate RV park or campground. PROPOSED TEXT AMENDMENTS TO ARTICLE 3 302. Recreational Vehicle (RV) Parks and Campgrounds. 302 (a) Purpose. The purpose of this section is to provide opportunities and standards for the parking and utilization of RV’s as a residential unit and for developed campgrounds and recreational vehicle parks that are properly sited with adequate public street access and adequate access to other public services which may be necessary. In order to create a desirable and successful recreation environment while protecting the public health, s afety, and welfare, Planning Commission review and consideration will be required for all RV Parks and Campgrounds; unless exempted in the following sections. Definitions: RV Park: A site of five-acres or more dedicated solely for the purpose of leasing individual sites for parking RV’s on a temporary basis. Campground: A site of five-acres or more dedicated solely for the purpose of leasing individual sites for tent camping or individual cabins rented on a temporary basis . Site: a designated piece of land within an RV park or Campgrounds upon which an RV or tent may be placed. 302 (b) Use Standards for an RV Park or Campground (1) Each park must have direct frontage and access to a collector or arterial street. Access to each individual RV site or camp site and any other provided structures shall be from internal/private streets. Individual sites shall not be accessed directly from a public road. (2) RV parks and campgrounds must be a minimum of 5-acres in size. (3) No site within an RV park or campground s hall be used as a permanent residence and shall only be for the use of travel trailers, pickup campers, coaches, motor homes, camping trailers, other vehicular accommodations, tents, park model units, and on-site rental cabins. No occupant may stay in a given campground for more than one hundred eighty (180) days in any calendar year. (4) Overall density of the park or campground shall be limited to no more than four (4) sites per acre. When a proposed park or campground will have 4 sites or less Planning Commission review as enumerated in Section 1203 will not be required. (5) Each site in the campground or park shall have a minimum area of eight hundred (800) square PROPOSED UDSO AMENDMENTS feet and have a stabilized and compacted vehicular parking pad of packed gravel, paving, or other suitable material large enough for the standard sizes of the types of recreational vehicles allowed plus room for one additional car or truck. At least one site must be ADA accessible. When permanent units (Cabins) are provided, at least one (1) unit must be ADA accessible. (6) All sites shall be setback from all side and rear property lines by a minimum of ten (10) feet and a minimum of twenty (20) from the edge of any public road right-of- way or the edge of any private road or drive. When the park or campground is adjacent to a residential use, that ten (10) feet of separation must be vegetated and maintained to provide a solid evergreen screen 8’ high. (7) Sites may be served by on-site sewage disposal system as permitted by SCDHEC; however, each individual site may not be served with an individual system. (8) For sites within the park that are not otherwise served with sewage disposal connections, an onsite bath house (provisions for restroom and bathing facilities) must be provided. (9) Sites shall not be served by individually metered power or water service. When multiple sites are being provided, master meter(s) must provide service to the entire park. All sites must have access to public water, either directly or communally. (10) For parks with more than 4 sites a storm shelter shall be provided per IRC standards. PROPOSED UDSO AMENDMENTS ITEM 10C – tiny home development OVERVIEW In an effort to provide citizens of Pickens County with a wide range of housing opportunities an ordinance to allow tiny home developments has been drafted. Anyone who wishes to build a single tiny home on their property already has that right. PROPOSED TEXT AMENDMENTS TO ARTICLE 3 315 (d) Tiny Home Developments 314 (d) - 1 - Purpose: The purpose of this section is to provide standards for tiny home developments. The purpose is to ensure that tiny homes are properly sited with adequate vehicular access and adequate access to other public services while protecting the public health, safety, and welfare, of the citizens of Pickens County. 314 (d) – 2 - Definition: For the purposes of this ordinance, Pickens County considers a tiny home to be a self - contained dwelling unit built with any compliant method and materials that is not on wheels (sometimes referred to as a Park Model) and is less than 600 square feet. Tiny homes on wheels – including Park Models - should refer to Section 104 (RV’s as a dwelling unit). 314 (d) – 3 - Tiny Homes Development Standards a) Each tiny home development must have direct frontage and access to a collector or arterial street. Access to each home site and any other provided structures shall be from internal/private streets. Individual home sites shall not be accessed directly from a public road. b) Tiny home developments must be a minimum of 5-acres in size. c) Overall density of the development shall be limited to no more than four (4) homes/lots per acre if utilizing a septic system and no more than eight (8) units per acre if on public sewer. d) Each home shall be sited on an individually deeded lot. e) If a tiny home is being fabricated off -site it must provide all appropriate certifications to Building Codes to verify the structure was built in accordance with all applicable building codes. f) Each lot in a tiny home development shall have a minimum area of twelve-hundred (1200) square feet with a stabilized and compacted vehicular parking pad of packed gravel, or paving, no smaller than 400 square feet. g) All lots shall be setback from all side and rear property lines by a minimum of ten (10) feet and a minimum of twenty (20) from the edge of any public road right-of- way or the edge of any private road or drive. h) Tiny home developments shall adhere to the same bufferyard standards as a mobile home park (Table 8.2 of the Pickens County UDSO. i) Setbacks within a tiny home lot in a tiny home development shall be 5’ for the front, sides, and rear. PROPOSED UDSO AMENDMENTS j) A minimum of two 2.5” caliper hardwood trees shall be planted per dwelling site in the ROW’s or other public areas. k) All lighting shall be Dark Sky compliant. l) Sites shall be served by an on-site sewage disposal system permitted by SCDHEC; m) Homes shall be served by individually metered power and water service. n) All tiny home developments of more than 10 dwellings shall require P lanning Commission review and approval. o) Each unit shall be taxed as a single-family dwelling. PROPOSED UDSO AMENDMENTS ITEM 10d - townhomes OVERVIEW The frequency of requests to build townhomes in the County has increased dramatically over the past year. The current standards on townhomes are minimal. This ordinance is an attempt to provide more direction in the development of townhomes. PROPOSED TEXT AMENDMENTS TO ARTICLE 3 Sec. 314 (b) Townhome Developments The following design standards shall govern the development of townhouse developments. 315 (1) Definition: A townhome is defined as an attached, privately owned single-family dwelling unit which is on its own parcel of land and is one consistent unit from the ground to the sky and is a part of and adjacent to other two or more other single-family dwelling units that are connected to but separated from one another by a common party wall having no doors, windows, or other provisions for human passage or visibility. 315 (2) Requirements: 1) Recreation amenities. Every townhome development must contain open space equal to 30% of the total acreage of the property with that parcel set aside as a separate parcel of land dedicated as open space in perpetuity. (1) Lot size: Each townhome shall be sited on an individual lot at least 2000 Square feet in size. (2) Dimensional Requirements: a. Front setbacks 25’ with a 15’ setback allowed if using rear yard parking or rear alleys loading driveways b. Side setbacks are 0’ for interior lot lines and 15’ for exterior lot lines (resulting in a minimum distance of 30’ between townhome buildings). c. Rear setback shall be 15’ d. Maximum building height shall be 35’ e. Maximum impervious surface coverage allowed is 65%. f. Minimum lot width shall be 20’ (3) Density a. Density of townhome developments (3 or more attached single family units) shall not exceed two (2) units per acre when served by individual on-site septic systems and (8) eight units per acre when served by a public system. (4) Access: Direct vehicular access of an individual townhouse shall be limited to the internal street network. Where a development exceeding 10 units fronts on a collector or arterial street, at least two access points shall be allowed. No direct access for individual units shall be permitted on collector or arterial streets. PROPOSED UDSO AMENDMENTS (5) Off-Street parking shall be governed by Article VI. (6) Buffers requirements shall be governed by Article VIII. (7) Height restrictions shall be governed by Section IV-14. 315 (3) Design and other Requirements: Townhouse projects shall meet the following requirements: (a) Buildings housing a series of townhouse units having a maximum length exceeding 120 feet shall have a change in plane or significant architectural detail for each 40 feet of unbroken plane having a minimum depth of five feet with a significant feature such as a courtyard or plaza incorporated into the façade's overall length. The plaza or courtyard shall have a minimum depth of 20' in depth and 20' in width. In no cas e shall an individual building exceed 200' in length. (b) For townhouses with front loading garages, the garage shall comprise less than 50% of the in dividual dwelling's width. (c) Driveways and walkways accessing individual townhouses shall be separated by landscaped strips at least 3' in width. (d) One upperstory tree shall be required along the front property line of the townhouses for every 30 feet of street frontage. i. The required street trees must be indicated on the landscape plan; and ii. New trees planted to meet this requirement shall be a minimum two-inch caliper. (e) Parallel on-street parking shall be designed as part of new streets and may be permitted subject to approval by the County Engineer on existing County-owned streets. (f) Underground utilities shall be provided. (g) All lighting shall be Dark Sky compliant. PROPOSED UDSO AMENDMENTS ITEM 11 – traffic study policy OVERVIEW Under the current wave of growth Pickens County is experiencing, one of the greatest causes of concern is the traffic impact these various projects have and will continue to have on our community. There are frequent calls for a developer to do a “traffic study”. I n an effort to standardize when a study is required, what type or types of studies are required, the geographic range of the st udy and how far into the future the study should consider traffic patterns, the County is proposing a Traffic Study Policy which will define these terms and automatically trigger the appropriate traffic research on a case-by-case basis. PROPOSED TEXT AMENDMENTS TO ARTICLE 10 TRAFFIC STUDY POLICY Purpose The purpose of the Pickens County Traffic Study Policy is to standardize the requirements for various development -related traffic studies in Pickens County. By establishing a set of metrics tied to best practices and commonly accepted data, the decision to require or not require a traffic study shall be made based on empirical data. These standards apply to County roads only with the SCD OT determining the studies required for state or federal roads. Triggers for A Traffic Study Being Required: The following chart shows the type and scope of traffic studies required for various projects: Development trips/day generated Traffic Impact Analysis Traffic Circulation Analysis Traffic Volume Study Speed Study Origin & Destination Study Traffic Capacity Study 0-500 None1 None1 None1 None1 None1 None1 501-1000 Required None1 None1 None1 None1 Required 1001-1250 Required Required None1 None1 None1 Required Greater 1250 Required Required Required Required Required Required 1 Unless a development has a single entrance on an existing road that has previously had a traffic volume study that stated that the road was at capacity after previous development and would require structural changes to accommodate additional traffic flow. Required Actions and Range of Study Based on Triggers: Development trips/day generated Peak Hour Calculation Un-signalized intersection range Signalized Intersection range Future Time Horizon Traffic Capacity Study 0-500 Yes 501-1000 Yes ¼ mile ¼ mile 10 years 1 mile 1001-1250 Yes ½ mile ½ mile 15 years 1.5 miles Greater 1250 Yes 2 miles 2 miles 20 years 2 miles PROPOSED UDSO AMENDMENTS Trip Generation - Trip Generation calculations shall follow the most current Edition of the ITE (Institute of Transportation Engineers). At the time of adoption of this policy the most current edition is the Eleventh (11th). Roadway/Paving Impact Analysis: Based on the outcome of the studies outlined above, the County Engineer shall review the data and make a recommendation regarding, but not limited to: • Roadway widening • Addition of travel lanes • Acceleration, deceleration, turning, or queuing lanes • The addition or removal of sidewalks • The addition or removal of bust stops • Curb/stormwater management work • Intersection signage including full signalization • Other signage as necessary • Parking study PROPOSED UDSO AMENDMENTS Notes and Addendum The County reserves the right to waive or require traffic studies based on unique factors specific to a particular project or location. Definitions Average Daily Trips - Average Daily Trips (ADT} are the total number of trips, both in-bound and out-bound, within a 24 hour weekday period, generated by a particular use or development. Pass-By Trip - Trips generated by the proposed Project that would be attracted from traffic passing the proposed project site on an adjacent street that contains direct access to the Project. Peak Hour Trip - Peak Hour Trips are vehicle trips, both in -bound and out-bound, occurring during a one hour period either during the AM Peak (7AM to 9AM} or the PM Peak (4PM to 6PM}, generated by a particular use or Project. Project - A Project subject to this policy encompasses all land use development projects affecting the built environment, including changes in occupancy or intensification of existing uses, over which the City has administrative or legislative authority, that require review and approval and issuance of a building permit, certificate of occupancy, or other land use approval by County staff, Commissions, or Council. Traffic Count - A traffic count is a count of traffic along a particular road, either done a digital counter (hose), electronically via photography and OCR technology, or by human counters. Traffic Impact Analysis (TIA) – A TIA is provided to assess the near-term and long-term effects of specific development activity on the roadway system in a comprehensive manner. Development activity may include rezoning, platting, development plan approvals, Thoroughfare Plan amendments, and annexations. Traffic Circulation Analysis (TCA) – A TCA is provided to determine how a development's traffic relates to existing traffic on internal and adjacent roadways. A TCA can be required during the same stages of the development process as a TIA, or it can be required at the time of building permit, driveway permit, development plan, or certificate of occupancy. A TCA is smaller in scope and magnitude than a TIA and focuses primarily on localized impacts. Traffic Volume Study - Traffic volume studies are conducted to determine the number, movements, and classifications of roadway vehicles at a given location. The data helps to identify critical flow time periods, determining the influence of large vehicles or pedestrians on vehicular traffic flow. Speed Study - Spot speed studies are conducted to estimate the distribution of speeds of vehicle in the traffic stream at a particular position on highway. This is done by recording the speeds of vehicle at the specified location. Origin and Destination Study - An origin-destination study is used to determine travel patterns of traffic on an installation during a typical day. This is a study to determine and analyze trips. Trips are defined as one- way movement, from where a person starts (origin) to where the person is going (destination). Traffic Flow Characteristics - Traffic flow is the study of the movement of individual drivers and vehicles between two points and the interactions they make with one another. Traffic Capacity Study - A traffic capacity study is done to determine the maximum number of vehicles in a lane or a road that can pass a given point in unit time per hour per lane or roadway. The traffic capacity indicates a capability or maximum rate of flow with a certain level of service characteristics that can be carried by the road. The traffic capacity of a roadway depen ds upon a number of prevailing roadways and traffic conditions. Parking Study - A parking study is defined as the ratio of number of bays occupied in a time duration to the total space available. It gives an aggregate measure of how effectively the parking space is utilized. Roadway/Paving Impact Analysis - This is recommended by the County Engineer to determine the ability of a given section of roadway to handle any proposed increase of various types of traffic based upon a proposed development. PROPOSED UDSO AMENDMENTS ITEM 12 – land use application OVERVIEW Any roadway, right-of-way or signage/signalization improvements necessary to make a proposed development safe and functional is the responsibility of the developer. In an effort to make that clear, the following amendment to the Land Use Application is being recommended. PROPOSED TEXT AMENDMENTS TO LAND USE APPLICATION Land Use Application Insert as Item #9 of application process: 9. Each project shall be reviewed according to the County Traffic Study Policy. If a project requires a traffic study of any type, the project may still be approved by the Planning Commission with the condition that upon completion of the traffic study and the subsequent review of the traffic study by the County Engineer, any roadway, transit, or mobility modifications, improvements or additions recommended by the County Engineer shall be agreed to and implemented by the developer. Failure to agree to implement the work that the County Engineer has deemed necessary would mean the project is no longer approved and would require a resubmittal to the Planning Commission in order for the project to proceed. PROPOSED UDSO AMENDMENTS ITEM 13 – common drives OVERVIEW Staff has reviewed the UDSO in regard to shared drives, common drives, and private roads. Staff’s recommendation is to leave shared drives and private roads as written and to eliminate common drives. The reason for this is that it is not at all uncommon for what starts out as a common drive to later be asked to be accepted by the County as a road yet it is not built to the appropriate standards. In addit ion, by not having the surfacing requirements, maximum slope requirements, or hammerhead/cul-de-sac requirements to allow for emergency vehicle access, having up to 10 homes being serviced by a common drive places these properties and their inhabitants at risk. PROPOSED TEXT AMENDMENTS TO ARTICLE 10 Sec. 1012 Private residential access. 1012(b) Common Drive (1) No more than ten (10) lots may have access to a common drive. (2) All lots which gain access from a common drive shall be at least one (1) acre in size, exclusive of that portion of the lot which is traversed by the required easement. (3) The common drive shall be located within an easement of at least fifty (50) feet in width or within a designated right-of- way of at least fifty (50) in width. If the common drive is located within a designated right-of-way, then that right-of-way shall be owned and controlled by a homeowner’s association or other entity responsible of the drive’s maintenance. (4) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the common drive. (5) The common drive cannot originate from a shared driveway, another common drive or from a private road or be connected at both ends to a public road. (6) The maintenance of the common drive must be mutually agreed upon by the respective property owners and this maintenance agreement shall be outlined in an acce ss agreement to be recorded with the Register of Deeds and individually noted within the respective deeds. (7) The following plat certification shall be placed upon every plat for every lot utilizing a common drive: 1. “The common drive and associated easement or right-of-way shown on this plat shall be a private access not owned, maintained, or supervised by Pickens County and not constructed pursuant to any pl an for future acceptance by Pickens County. All easements and right-of-ways shown upon the plat shall not be accepted for maintenance by Pickens County at any time in the future unless constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as amended.” (8) Only those lots approved by the Planning Commission or by Planning Staff and platted with the common drive may utilize said drive. (9) The common drive must be named; said name shall be approved by Pickens County E-911 staff (when three (3) or more lots are utilizing the common drive). (10) The following, minimum construction standards shall apply. The standards must be certified as being met by a surveyor or engineer licensed in the State of South Carolina prior to plat approval. a. Have a fourteen (14) foot driving surface with four (4) inch thick compacted stone base and height clearance of thirteen and one-half (13.5) feet, and if a bridge is constructed as part of the private drive, a professional engineer shall certify the weight which the bridge will support and a sign shall be conspicuously displayed on each end of the bridge displaying the weight limits. PROPOSED UDSO AMENDMENTS b. Be provided with an unpaved cul-de-sac having a radius of thirty (30) feet or ending in a (t) with two twenty-five (25) foot extensions for vehicular turning movements. c. Observe minimum road offsets for public roads. When an offset in alignment of a road occurs and where the topography is suitable, a minimum distance between eighty (80) feet and one hundred and twenty-five (125) feet shall separate opposing roads from centerline to centerline. d. Observe the sight distance standards where the private drive intersects a pub- lic road to allow at least one hundred (100) feet of sight distance for each ten (10) miles per hour of the posted speed limit. The sight distance shall be measured from a seeing height of three and one-half feet to an object one foot in height above the grade of the public road. If the proposed drive does not meet the sight distance requirement, a waiver must be signed by the individual(s) constructing the private drive stating that the owner(s) is liable and responsible for any accidents, injuries, problems, and property damage resulting from improper sight distance. e. Meet the County’s and DHEC Storm Water Management and Erosion and Sediment Control Regulations. No. 8: ORDINANCES FOR FIRST READING AND/OR RESOLUTIONS: a) FIRST READING IN TITLE ONLY OF AN ORDINANCE AUTHORIZING AND APPROVING (1) THE DEVELOPMENT OF A JOINT COUNTY INDUSTRIAL AND BUSINESS PARK PURSUANT TO SECTION 4-1-170 OF THE CODE OF LAWS OF SOUTH CAROLINA 1976, AS AMENDED, IN CONJUNCTION WITH OCONEE COUNTY (THE “PARK”), SUCH PARK TO BE GEOGRAPHICALLY LOCATED IN OCONEE COUNTY; (2) THE EXECUTION AND DELIVERY OF A WRITTEN PARK AGREEMENT WITH OCONEE COUNTY AS TO THE REQUIREMENT OF PAYMENTS OF FEE IN LIEU OF AD VALOREM TAXES WITH RESPECT TO PARK PROPERTY AND THE SHARING OF THE REVENUES AND EXPENSES OF THE PARK; (3) THE DISTRIBUTION OF REVENUES FROM THE PARK WITHIN PICKENS COUNTY; AND (4) OTHER MATTERS RELATED THERETO. b) CONSIDERATION OF A RESOLUTION 2023-13 TO RECOGNIZE MAY 2023 AS STROKE AWARENESS MONTH IN PICKENS COUNTY. c) CONSIDERATION OF A RESOLUTION 2023-14 PROCLAIMING THE WEEK OF MAY 21-27, 2023, AS EMERGENCY MEDICAL SERVICES WEEK IN PICKENS COUNTY. d) CONSIDERATION OF A RESOLUTION 2023 -15 PROCLAIMI NG MAY 15 AS PEACE OFFICERS MEMORIAL DAY IN PICKENS COUNTY. e) CONSIDERATION OF A RESOLUTION 2023-16 TO RECOGNIZE MAY 21-27, 2023 AS NATIONAL PUBLIC WORKS WEEK IN PICKENS COUNTY. f) CONSIDERATION OF A RESOLUTION 2023-17 RECOGNIZING MAY 2023 AS MENTAL HEALTH MONTH IN PICKENS COUNTY. g) CONSIDERATION OF A RESOLUTION 2023-18 PROCLAIMING THE WEEK OF MAY 20-26, 2023 AS SAFE BOATING WEEK IN PICKENS COUNTY. h) CONSIDERATION OF A RESOLUTION 2023-19 RECOGNIZING MAY 2023 AS NURSE’S MONTH IN PICKENS COUNTY. i) CONSIDERATION OF A RESOLUTION 2023-20 RECOGNIZING MAY 8-12, 2023 AS TEACHER APPRECIATION WEEK IN PICKENS COUNTY. j) CONSIDERATION OF A PROCLAMATION 2023 -21 RECOGNIZING MAY 12, 2023 AS “LETTER CARRIERS’ STAMP OUT HUNGER FOOD DRIVE DAY” IN PICKENS COUNTY STATE OF SOUTH CAROLINA ) ) RESOLUTION #_____________ COUNTY OF PICKENS ) A RESOLUTION PROCLAIMING MAY 202 3 AS STROKE AWARNENESS MONTH IN PICKENS COUNTY. WHEREAS, stroke is the No. 5 cause of death and a leading cause of disability in the United States; and WHEREAS, stroke is South Carolina’s third biggest killer; and WHEREAS, st roke can happen to anyone , any age, any time , and everyone needs to know the warning signs; and WHEREAS, on average, 1.9 million brain cells die every minute that a stroke goes untreated; and WHEREAS, according to the National Stroke Association, acting quickly when someone is experiencing a stroke can mean the difference between life or death, and recovery or disability; and WHEREAS, F.A.S.T. is an acronym for things to check in a suspected stroke victim: F – Face Drooping: does one side of the face droop or is it numb? Ask the person to smile. Is the person's smile uneven? A – Arm Weakness: is one arm weak or numb? Ask the person to raise both arms. Does one arm drift downward? S – Speech: is speech slurred? Is the person unable to speak or hard to understand? Ask the person to repeat a simple sentence, like "The sky is blue." T - Time to Call 9-1-1. If someone shows any of these symptoms, even if the symptoms go away, call 9-1-1. Emergency medical services (EMS) staff can begin life -saving treatment immediately and patients can receive faster treatment at the hospital when arriving by ambulance. NOW THEREFORE, Pickens County Council, proclaims May 2023 as Stroke Awareness Month and encourages all citizens to make recognizing the signs of stroke a priority. Passed and approved, this ____ day of __________________, 2023. COUNTY COUNCIL OF PICKENS COUNTY, SOUTH CAROLINA Chris Bowers, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: ____________________________________ Meagan Nations, Clerk of County Council Pickens County, South Carolina STATE OF SOUTH CAROLINA ) ) RESOLUTION #_____________ COUNTY OF PICKENS ) A RESOLUTION PROCLAIMING THE WEEK OF MAY 21-27, 202 3, AS EMERGENCY MEDICAL SERVICES WEEK WHEREAS, emergency medical services are a vital public service; and WHEREAS, the members of emergency medical services teams are ready to provide lifesaving care to those in need 24 hours a day, seven days a week; and WHEREAS, access to quality emergency care dramatically improves the survival and recovery rate of those who experience sudden illness or injury; and WHEREAS, emergency medical services have grown to fill a gap by providing important, out of hospital care, including preventative medicine, follow-up care, and access to telemedicine; and WHEREAS, the emergency medical serv ices system consists of first responders, emergency medical technicians, paramedics, emergency medical dispatchers, firefighters, police officers, educators, administrators, pre -hospital nurses, emergency nurses, emergency physicians, trained members of the public, and other out of hospital medical care providers; and WHEREAS, the members of emergency medical services teams, whether career or volunteer, engage in thousands of hours of specialized training and continuing education to enhance their lifesaving skills; and WHEREAS, it is appropriate to recognize the value and the accomplishments of emergency medical services providers by designating Emergency Medical Services Week; NOW THEREFORE, Pickens County Council, in recognition of this event do es hereby proclaim the week of May 21-27, 2023, as Emergency Medical Services week. With the theme, “EMS: Rising to the Challenge ,” County Council encourages the community to observe this week with appropriate programs, ceremonies and activities , and directs the County Administrator to recognize our County Emergency Medical Services employees appropriately. Passed and approved, this ____ day of __________________, 2023. COUNTY COUNCIL OF PICKENS COUNTY, SOUTH CAROLINA Chris Bowers, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: ____________________________________ Meagan Nations, Clerk of County Council Pickens County, South Carolina STATE OF SOUTH CAROLINA ) ) RESOLUTION #_____________ COUNTY OF PICKENS ) A RESOLUTION PROCLAIMING PEACE OFFICERS MEMORIAL DAY 2023 WHEREAS, the Congress and President of the United States have designated May 15 as Peace Officers Memorial Day; and WHEREAS, the members of the Pickens County Sheriff's Office play an essential role in safeguarding the rights and freedoms of the citizens of our community; and WHEREAS, it is important that all citizens know and understand the duties, responsibilities , hazards and sacrifices of their law enforcement officers, and that law enforcement officers recognize their duty to serve the people of this County, by protecting them against violence and disorder; and WHEREAS, the law enforcement officers of the Picken s County Sheriff's Office unceasingly provide a vital public service; NOW, THEREFORE, the County Council of the County of Pickens directs that all flags on County buildings be flown at half-staff on May 15, 2023, in recognition of Peace Officers Memorial Day and in memory of those law enforcement officers, who through their courageous deeds, have made the ultimate sacrifice in service to their communities or have become disabled in the performance of duty, and to honor those law enforcement officers presently serving all communities. Passed and approved, this ____ day of __________________, 2023. COUNTY COUNCIL OF PICKENS COUNTY, SOUTH CAROLINA Chris Bowers, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: ____________________________________ Meagan Nations, Clerk of County Council Pickens County, South Carolina STATE OF SOUTH CAROLINA ) ) RESOLUTION #_____________ COUNTY OF PICKENS ) A RESOLUTION TO RECOGNIZE MAY 21-27, 202 3 AS NATIONAL PUBLIC WORKS WEEK WHEREAS, public works professionals focus on infrastructure, facilities and services that are of vital importance to sustainable and resilient communities and to the public health, high quality of life and well-being of the people of Pickens County and, WHEREAS, these infrastructure, facilities and services could not be provided without the dedicated efforts of public works professionals, who are engineers, managers and employees at all levels of government and the private sector, who are responsible for rebuilding, improving and protecting our nation’s transportation, water supply, water treatment an d solid waste systems, public buildings, and other structures and facilities essential for our citizens; and, WHEREAS, it is in the public interest for the citizens, civic leaders and children in Pickens County to gain knowledge of and to maintain a progr essive interest and understanding of the importance of public works and public works programs in their respective communities; and, WHEREAS, the year 2023 marks the 63rd annual National Public Works Week sponsored by the American Public Works Association; and WHEREAS, Pickens County’s public works divisions (Operations, Roads and Bridges, and Solid Waste) consistently collaborate with all other county departments to best serve the citizens of Pickens County, especially through contributions to the new Pickens Proud comprehensive litter program and by the implementation of increased road maintenance and paving afforded through the Road Maintenance Fund and Road Reserve Fund; NOW, THEREFORE, BE IT RESOLVED the Pickens County Council does hereby designate the week May 21 – 27, 2023 as National Public Works Week; we urge all citizens to join with representatives of the American Public Works Association and government agencies in activities, events and ceremonies designed to pay tribute to o ur public works professionals, engineers, managers and employees and to recognize the substantial contributions they make to protecting our national health, safety, and quality of life. Passed and approved, this ____ day of __________________, 2023. COUNTY COUNCIL OF PICKENS COUNTY, SOUTH CAROLINA Chris Bowers, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: ____________________________________ Meagan Nations, Clerk of County Council Pickens County, South Carolina STATE OF SOUTH CAROLINA ) ) RESOLUTION #_____________ COUNTY OF PICKENS ) A RESOLUTION RECOGNIZING MAY 2023 AS MENTAL HEALTH MONTH IN PICKENS COUNTY WHEREAS, good mental health is essential to overall health and quality of life, including t he well-being of our families, communities, schools, and businesses; and WHEREAS, mental health is important at every stage of life, from childhood and adolescence through adulthood; and WHEREAS, since January 2021, Pickens County has raised awareness and connected crisis care providers through the SAMHSA Crisis Intercept Mapping for Suicide Prevention for Service Members, Veterans, and their Families and continues to focus on supporting positive mental health outcomes for those of have served our country; and WHEREAS, with early and effective interventions, those individuals with mental health conditions can recover and lead full, productive lives; and WHEREAS, greater public awareness about mental health can change negative attitudes and behaviors toward people living with mental illnesses; and WHEREAS, spending time in nature is linked to many positive mental health outcomes – improved focus, lower stress, better mood, and reduced risk of developing a mental health condition, and WHEREAS, Pickens County offers a variety of outdoor attractions and natural wonders , making our county the perfect environment in which to boost mental health through enjoying the outdoors; NOW THEREFORE, BE IT RESOLVED that Pickens County Counc il does hereby proclaim May 2023 as Mental Health Month in Pickens County and calls upon the citizens, public and private institutions, businesses, and schools in Pickens County to commit our community to increasing awareness and understanding of mental health through compassion for our neighbors. Furthermore, Council recognizes the benefits of spending time outdoors to one’s mental health and encourages the community to explore Pickens County trails and parks throughout the month of May. Passed and approved, this ____ day of __________________, 2023. COUNTY COUNCIL OF PICKENS COUNTY, SOUTH CAROLINA Chris Bowers, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: ____________________________________ Meagan Nations, Clerk of County Council Pickens County, South Carolina STATE OF SOUTH CAROLINA ) ) RESOLUTION #_____________ COUNTY OF PICKENS ) RESOLUTION PROCLAIMING THE WEEK OF MAY 20-26, 2023 AS SAFE BOATING WEEK WHEREAS, f or nearly 100 million Americans, boating continues to be a popular recreational activity for people from coast to coast and everywhere in between, who take to the water and enjoy time together boating, sailing, paddling and fishing; and WHEREAS, Pickens County has amazing natural resources, including Lake Jocassee, Lake Keowee, and Lake Hartwell, which are enjoyed by our residents and visitors alike throughout the year; and WHEREAS, during National Safe Boating Week, the U.S. Coast Guard and its federal, state, and local safe boating partners encourage all boaters to explore and enjoy America ’s beautiful waters responsibly; and WHEREAS, National Safe Boating Week is observed to bring attention to important life -saving tips for recreational boaters so that they can have a safer, more fun experience out on the water throughout the year; and WHEREAS, on average, 650 people die each year in boating -related accidents in the U.S.; 75 percent of these are fatalities caused by drowning; and WHEREAS, the vast majority of these accidents are caused by human error or poor judgment and not by the boat, equipment or environmental factors; and WHEREAS, a significant number of boaters who lose their lives by drowning each year would be alive today had they worn their life jackets; and NOW THEREFORE, Pickens County Council , hereby support s the goals of the Safe Boating Campaign and proclaims May 20-26, 2023 as National Safe Boating Week and the start of the year- round effort to promote safe boating. In Witness Thereof, Council urges all those who boat to practice safe boating habits and wear a life jacket at all times while boating. Passed and approved, this ____ day of __________________, 2023. COUNTY COUNCIL OF PICKENS COUNTY, SOUTH CAROLINA Chris Bowers, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: ____________________________________ Meagan Nations, Clerk of County Council Pickens County, South Carolina STATE OF SOUTH CAROLINA ) ) RESOLUTION #_____________ COUNTY OF PICKENS ) A RESOLUTION RECOGNIZING MAY 2023 AS NURSES MONTH IN PICKENS COUNTY WHEREAS, registered nurses in the United States constitute our nation’s largest health care profession, and WHEREAS, the depth and breadth of the registered nursing profession meets the different and emerging health care needs of the American population in a wide range of settings, including the frontline of the pandemic, and WHEREAS, the American Nurses Association, as the voice for registered nurses in this country, is working to chart a new course for a healthy nation that relies on increasing access to primary and preventive health care, and better utilization of all our nation’s registered nursing resources, and WHEREAS, professional nursing is an indispensable component of the safety and quality of care of hospitalized and non-hospitalized patients, and WHEREAS, professional nursing is an indispensable component of the safety and quality of care of hospitalized patients, and WHEREAS, the demand for registered nursing services will be greater than ever because of the aging of the American population, emerging health challenges, the continuing expansion of life - sustaining technologies, and the explosive growth of home health care services, and WHEREAS, more qualified registered nurses are needed in the future to meet the increasingly complex needs of health care consumers in this community, and WHEREAS, the cost-effective, safe, and high-quality health care services provided by registered nurses will be an increasingly important component of the United States health care delivery system in the future, and WHEREAS, the American Nurses Association has declared May as Nurses Month, with the theme “You Make a Difference,” with appreciation for nurses’ unparalleled impact during the pandemic, and their contributions to health care, and an ope n invitation to #ThankaNurse for enriching our lives and the world we live in, NOW THEREFORE, BE IT RESOLVED that Pickens County Council does hereby designate May 2023 as Nurses Month and asks that all residents of Pickens County join us in honoring the registered nurses who care for all of us; and BE IT FURTHER RESOLVED, that the residents of Pickens County celebrate registered nurses’ accomplishments and efforts to improve our health care system and show our appreciation for registered nurses not just during this month, but at every opportunity throughout the year. Passed and approved, this ____ day of __________________, 2023. COUNTY COUNCIL OF PICKENS COUNTY, SOUTH CAROLINA Chris Bowers, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: ____________________________________ Meagan Nations, Clerk of County Council Pickens County, South Carolina STATE OF SOUTH CAROLINA ) ) COUNTY OF PICKENS ) RESOLUTION #________________ A RESOLUTION RECOGNIZING MAY 8 – 12, 2023 AS TEACHER APPRECIATION WEEK WHEREAS, the School District of Pickens County serves all of Pickens County with 14 elementary schools, five middle schools, four high schools, online learning through the Pickens County Virtual Academy, and a state-of-the-art Career and Technology Center; and WHEREAS, the SDPC is the 15th largest school district in South Carolina with the annual enrollment of about 16,300 students, and our students consistently rank near the top of the state in academic achievement; and WHEREAS, the SDPC has experienced 8 years of continuous graduation growth; and WHEREAS, the success of the students is a testament to the consistent hard work, dedication, energy, and creativity of the teachers and staff of the schools in our County; and WHEREAS, the individuals who chose to become educators did so in order to enrich the lives of children and young people; and WHEREAS, Pickens County Council is grateful for the service of our educators every day; NOW THEREFORE, BE IT RESOLVED that Pickens County Council does hereby recognize May 8 – 12, 2023 as Teacher Appreciation Week in Pickens County. Passed and approved, this ____ day of __________________, 2023. COUNTY COUNCIL OF PICKENS COUNTY, SOUTH CAROLINA Chris Bowers, Chairman of County Council Pickens County, South Carolina (SEAL) Attest: ____________________________________ Meagan Nations, Clerk of County Council Pickens County, South Carolina No. 9: ORDINANCES FOR SECOND READING a) SECOND READING OF AN ORDINANCE NO. 623 TO PROVIDE FOR ADOPTION OF A BUDGET AMENDMENT CONTAINING ESTIMATES OF REVENUE AND EXPENDITURE CHANGES FOR PICKENS COUNTY FOR THE FISCAL YEAR BEGINNING JULY 1, 2022 AND ENDING JUNE 30, 2023. b) SECOND READING OF AN ORDINANCE NO. 624 TO PROVIDE FOR THE LEVY OF TAXES IN PICKENS COUNTY FOR ORDINARY COUNTY PURPOSES FOR THE FISCAL YEAR BEGINNING JULY 1, 2023, AND ENDING JUNE 30, 2024, AND TO DIRECT EXPENDITURE THEREOF. c) SECOND READING OF AN ORDINANCE REGARDING AMENDMENTS TO CHAPTER 6 OF THE PICKENS COUNTY CODE OF ORDINANCES SPECIFIC TO THE OPERATIONS OF THE PICKENS COUNTY AIRPORT AND MATTERS RELATED THERETO. ORDINANCE NO: First Reading: April 3rd 2023 Second Reading: Public Hearing: Third Reading: AN ORDINANCE TO PROVIDE FOR ADOPTION OF A BUDGET AMENDMENT CONTAINING ESTIMATES OF REVENUE AND EXPENDITURE CHANGES FOR PICKENS COUNTY FOR THE FISCAL YEAR BEGINNING JULY 1, 20 22 AND ENDING JUNE 30, 2023. Be it enacted by the County Council, Pickens County, South Carolina: Section 1. That for the estimated revenues and expenditures of the government and its activities for the fiscal year, beginning July 1, 2022, and ending June 30, 2023, the amounts in the following sections are hereby amended. Section 2. That for the fiscal year the budget is hereby amended as follows: Budgeted Revenue $ 78,672,654 Budgeted Revenue Increase (Decrease): 1. Investment Income 1,500,000 2. State Supplement 45,000 3. Master in Equity Savings 25,000 4. Capital 70,000 5. Grants 3,433,309 6. Fund Balance 6,643,867 Total Budget Revenue Increase (Decrease): $ 11,717,176 Amended Budget Revenue $ 90,389,830 Budget Expenditures $ 78,672,654 Budgeted Expenditures Increase (Decrease): 1. Attorney Fees $ 50,000 2. EMS-Overtime 350,000 3. EMS- Fuel 70,000 4. Roof Study Administration Building 20,000 5. Grants – multiple Departments 3,433,309 6. Health Insurance 50,000 7. State Supplement (Sheriff, Clerk of Court, Probate) 45,000 8. Elections Hardware Contract 15,012 9. Economic Development- Project Farmhouse A 2,700,000 10. Economic Development – Project Big Dog 2,100,000 11. Solid Waste- Tana Shredder 990,577 12. Solid Waste- Survey Equipment 149,195 13. Solid Waste- Stump Hole 28,083 14. Solid Waste- Overtime 125,000 15. Solid Waste – Fuel 100,000 16. Solid Waste- Excavator 142,000 17. Floor at Museum 15,000 18. Emergency Management- Generator Hookup 23,000 19. Building Maintenance – Renovations 25,000 20. Repairs to Vehicles (multiple departments) 170,000 21. Airport Projects 1,116,000 Total Increase (Decrease) to Amended Budgeted Expenditures $ 11,717,176 Amended Budgeted Expenditures $ 90,389,830 Section 3. The purpose of this amendment is to provide additional funds for unanticipated and unbudgeted expenditures. Section 4. All ordinances or part of ordinances, inconsistent with this ordinance are hereby repealed. Approved upon third reading: Attest: ______________________________ Chris Bowers, Chairman _________________________________ Meagan Nations, Clerk to Council Ordinance No. First Reading: April 3rd 2023 Second Reading: Public Hearing: Third Reading: (STATE OF SOUTH CAROLINA) (COUNTY OF PICKENS) AN ORDINANCE TO PROVIDE FOR THE LEVY OF TAXES IN PICKENS COUNTY FOR ORDINARY COUNTY PURPOSES FOR THE FISCAL YEAR BEGINNING JULY 1, 20 23, AND ENDING JUNE 30, 2024, AND TO DIRECT EXPENDITURE THEREOF. Be it enacted by the County Council, Pickens County, South Carolina: SECTION 1. A tax of so many mills as is necessary is hereby le vied on all taxable property in Pickens County for ordinary County purposes for the fiscal year beginning July 1, 2023, and ending June 30, 2024, for the amounts and purposes hereinafter mentioned. The millage levy shall not exceed that number of mills necessary to raise the sums herein appropriated. After deducting the expected revenues herein stated, such millage shall be determined by the County Auditor, subject to the approval of a majority of the Pickens County Council. Furthermore, there is levied a tax of educational mills to provide approximately $1,661,363 local funding for Tri-County Technical College. All materials, equipment and supplies which are paid for from the public funds of the County, to be used by the County or any officer of any department thereof, shall be purchased by the Purchasing Department under the authority of the County Administrator. Purchases shall be in accordance with procedures outlined in the County Procurement Ordinance. SECTION 2. The County operation appropriations have been detailed by the County Council into line - item accounts for each department. The detailed appropriation by account and budget narrative contained in this document is hereby adopted as a part of the Ordinance. SECTION 3. No bills or claims against Pickens County shall be approved for payment and no check will be issued for same unless such bills or claims are properly itemized showing the supplies or articles purchased, the services rendered with the proper dates of such purchases and rendering of such services and duties, and bearing signature of person receiving such supplies or services. SECTION 4. The County Administrator shall be authorized to expend up to five thousand dollars ($5,000.00) from the Contingency Fund as a supplemental appropr iation for a special purpose not anticipated when the original budget appropriation was approved. SECTION 5. The County Administrator is permitted to transfer appropriations between object classification codes within departmental budgets. Unemployment ins urance, capital and training may be transferred within object codes and between department and non-departmental accounts. SECTION 6. All dependent boards, agencies, commissions, etc., fully or partially funded by Pickens County Council, are required to fu rnish a complete audit to County Council not later than six (6) months after the close of each individual fiscal year and to supply to the County Administrator, upon his request, any and all accounting records, reports and documents necessary for him and t he County Council to supervise the financial condition of the County. SECTION 7. All service charges, fees, fines, etc. received by County departments shall be deposited with the County Treasurer as soon as possible after collection, but in no case shall the time lapse between collection and depositing with the Treasurer exceed five (5) business days. These receipts shall be used to finance general obligations of the County and will not be returned to the various departments. Unexpended budgetary appropriations of and monies received by County departments and existing at the close of the fiscal year 2023 shall revert to the general fund of Pickens County. SECTION 8. The County Council is authorized to carry forward unexpended funds in accounts existing at the end of June 30, 20 23, to complete the purpose of the original appropriation approved by County Council for fiscal year 2024. SECTION 9. The County Administrator, in consultation with the County Treasurer and based on financial conditions and cash flow considerations, shall determine the proper rate of disbursement of funds appropriated during the fiscal year. SECTION 10. The Pickens County Planning Commission and Pickens County Economic Development Alliance, upon approval of County Council, may enter into agreements and contracts with governmental agencies or private concerns to accomplish authorized planning programs, studies and surveys, provided that the Commission shall have no authority to obligate County funds in excess of the amounts appropriated herein or authorized by County Council. SECTION 11. The revenue generated by a separate levy of millage to provide $1,742,363 is appropriated to defray the principal and interest payments on all County bonds and on any lease -purchase agreements authorized to cover other capital expenditures. SECTION 12. The standard mileage rate reimbursed to County employees for use of their personal vehicles will be equal to the amount set by the Internal Revenue Service. SECTION 13. The rate reimbursed to County employees for meals during official County business will be breakfast $12.00, lunch $15.00 and dinner $23.00. SECTION 14. The revenue generated by a separate levy of millage on the unincorporated area to provide $272,591 is appropriated to defray the principal and interest payments on the Roper Plant and Cramer plant. SECTION 16. The revenue generated by a separate levy of millage to provide $9,481,766 as is necessary is hereby levied on all taxable property in the Pickens County Fire District for the f iscal year beginning July 1, 2023, and ending June 30, 2024, for the amounts and purposes hereinafter mentioned. The millage levy shall not exceed that number of mils necessary to raise the sums herein appropriated. SECTION 17. The County Administrator is authorized to declare surplus items and/or fixed assets as surplus once such items have become obsolete or exhausted their useful life, and may dispose of same in a manner deemed (in the Administrator’s discretion) to be in the best interest of the County. APPROVED UPON THIRD READING THIS THE ____ DAY OF JUNE 20 23 _______________________________ Chris Bowers, Chairman Pickens County Council Attest: ________________________________ Meagan Nations, Clerk to Council Pickens County Airport • 240 airport road, liberty, SC 29657 • 864-843-5803 Carlos Salinas, Airport Administrator Pickens County Airport PICKENS COUNTY COMMITTEE OF THE WHOLE MEETING Monday, April 17, 2023 Log No. 212 – DISCUSSION ON AMENDMENTS TO CHAPTER 6 OF THE PICKENS COUNTY CODE OF ORDINANCES SPECIFIC TO THE OPERATIONS OF THE PICKENS COUNTY AIRPORT AND MATTERS RELATED THERETO (j)Takeoffs and landings. Unless an emergency situation is present, all takeoffs and landings shall be confined to the runways. Provided however, takeoffs and landings of ultralight vehicles shall not be subject to this requirement, and shall instead be g overned by any and all regulations as may be promulgated pursuant to the authority of Section 6-77 of this Code of Ordinances. 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 1/10 (a) (b) Chapter 6 - AVIATION Footnotes: --- (1) --- Cross reference— Airport district, § 14-341 et seq. State Law reference— Aeronautics generally, S.C. Code 1976, title 55; authority of county to establish an airport, S.C. Code 1976, § 55-9-30. ARTICLE I. - IN GENERAL Secs. 6-1—6-30. - Reserved. ARTICLE II. - RESERVED Footnotes: --- (2) --- Editor's note— Ord. No. 523, adopted Dec. 5, 2016, repealed former art. II, §§ 6-31—6-37, which pertained to aeronautics commission, and derived from Ord. No. 153, §§ 2—8, adopted March 5, 1990; and Ord. No. 466, adopted June 10, 2013. Secs. 6-31—6-70. - Reserved. ARTICLE III. - OPERATIONS Footnotes: --- (3) --- State Law reference— Uniform State Aeronautical Regulatory Law, S.C. Code 1976, § 55-5-10 et seq.; provisions inapplicable to government airports, S.C. Code 1976, § 55-5-130. Sec. 6-71. - General provisions. Airport operated in public interest. In the exercise and performance of its powers and duties, the county council recognizes and declares that the county airport is to be operated in the public interest and declares its intentions to encourage and develop air transportation for the users of the airport and to that end pledges the use of the airport for public, governmental and county purposes. Prohibited acts. The county council makes it unlawful for any person to violate the provisions of this article. 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 2/10 (c) (d) (e) (f) Penalty. Any person who violates a provision of this article shall be deemed guilty of a misdemeanor and upon conviction shall be punished in accordance with section 1-7. Multiple or continuous violations. Each violation of a separate provision of this article shall constitute a separate offense. Further, in the event of a continuous violation under the provisions of this article, each day that a violation is continued shall constitute a separate offense. Jurisdiction. The violation of any provision of this article shall be triable in the magistrate's courts of the county pursuant to S.C. Code 1976, § 4-9-30(14). Emergency procedures. When an emergency exists at the airport, the manager or any commissioner shall be empowered to take such action which, within his discretion and judgment, is necessary or desirable to protect the health, welfare and safety of persons and property and to facilitate the operation of the airport; and no person shall interfere with the performance of their duties or anyone acting under their control or direction. (Ord. No. 130, §§ 1.1—1.5, 1.9, 2-15-1988) Sec. 6-72. - Denitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning. Words not specifically defined in this section which relate to aeronautical practices, processes and equipment shall be construed according to their general usage in the aviation industry. Abandon means to forsake, desert, give up and surrender one's claim or right. Air operations area or AOA means any area of the airport used or intended to be used for landing, taking off or surface maneuvering of aircraft, excluding those leasehold areas, within or having access to the AOA. Aircraft means any fixed-wing or rotary contrivance, excluding ultralight craft, now known or hereafter designed, invented or used for navigation or flight in the air, except a parachute or other contrivance used primarily as safety equipment. Airfield means that area of aircraft movement consisting exclusively of runways and taxiways. Airport means the Pickens County Airport. Apron means that portion of the AOA designated by operations directive of the department for the loading, unloading, servicing or parking of aircraft which is not controlled by the FAA or an air traffic controller. Authorized means acting under or pursuant to a written contract, permit, authorization or other evidence of right issued by the commission or manager. Commission means the county aeronautics commission established in article II of this chapter pursuant to Act No. 184 of the 1967 Acts and Joint Resolutions of the South Carolina General Assembly. 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 3/10 (1) (2) (3) (4) Commissioner means a duly appointed and serving member of the commission. Domestic animal means any animal of a species usually domesticated in the United States and customarily found in the home. FAA means the Federal Aviation Administration. FBO means fixed base operator. This term is further defined as only those individuals, corporations or firms which are authorized to engage in and furnish a full range of aeronautical activities and services, which shall include as a minimum the following: Sale and dispensing of aviation fuels and oils. Suitable aircraft storage and ample tiedown spaces. Flight training by properly FAA certified instructors and adequate classroom facilities. Capability to perform FAA approved aircraft, engine and accessory maintenance. Flammable liquid means any liquid which emits flammable vapor as set forth in National Fire Protection Association (NFPA) standards, including but not limited to combustible liquids currently used as aircraft or vehicle fuel. Manager means the person authorized and directed by the commission to supervise the operation and maintenance of the airport. Motor vehicle means a device in, upon or by which a person or property may be propelled, moved or drawn upon land or water, except a device moved by human or animal powers and except aircraft or devices moved exclusively upon stationary rails or tracks. Operator means any person who is in actual physical control of an aircraft or motor vehicle. Owner means a person who holds the legal title of an aircraft or a motor vehicle; or if the aircraft or motor vehicle is the subject of a conditional sale or lease with the right of purchase upon performance of the conditions stated in the agreement, and with the immediate right of possession vested in the conditional vendee or lessee or anyone in possession of an aircraft or motor vehicle on the airport, or if a mortgagor of an aircraft or motor vehicle is entitled to possession, the conditional vendee, lessee or mortgagor shall be deemed the owner for the purpose of this article. Park means to put or leave or let a motor vehicle or any aircraft stand or stop in any location whether the operator leaves or remains in such vehicle or aircraft, when such standing or stopping is not required by traffic controls or conditions beyond the control of the operator. Restricted area means any area of the airport posted to prohibit entry or to limit entry or access to specific authorized persons. 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 4/10 (a) (b) (c) (d) (e) (f) (g) Solicitation or to solicit means to directly or indirectly, actively or passively, openly or subtly, ask, request, importune, seek, or try to obtain. Tenant or lessee means any person engaged in business on the airport under authority granted by the manager or by virtue of a contract with the commission. Transient aircraft means an aircraft not using the airport as its permanent base of operations. Weapon means a gun, blackjack, metal knuckles or any explosive device, or any other instrument which may be utilized to coerce or intimidate an individual. Wild animal means any animal of a species not usually domesticated in the United States nor customarily found in the home. (Ord. No. 130, § 1.10, 2-15-1988) Cross reference— Definitions generally, § 1-2. Sec. 6-73. - General conduct. Public to observe and obey posted signs, fences and barricades prohibiting entry. The public shall observe and obey all posted signs, fences and barricades prohibiting entry upon aircraft operation areas (AOAs) or governing the activities and demeanor of the public while on the airport. Restricted areas. No person shall be permitted to walk or drive across or upon the restricted areas of the airport without proper authority from the manager. Disorderly conduct, gambling prohibited. No person shall commit any act of nuisance, nor conduct or engage in any form of gambling on the airport premises. Refuse to be disposed of in receptacles. No person shall dispose of garbage, papers, refuse or other material on the airport premises except in receptacles provided for that purpose. Vandalism and damage to airport property. No person shall destroy, injure, damage, deface or disturb in any way public property of any nature located on the airport. Any person causing or being responsible for the injury, destruction or damage or disturbances to airport property shall report such activity to the office of the manager and, upon demand by such office, shall reimburse the county for the full amount of damage. Tampering or interfering with aircraft. No person shall tamper or interfere with any aircraft or put in motion the engine of such aircraft or use any aircraft parts, instruments or tools without permission of the owner or by specific instructions of the manager. Pets at airport prohibited; exception. No person shall enter the restricted area or terminal building at the airport with any pet except guide dogs and pets that are to be or have been transported by air, provided that such pets are suitably housed in approved containers. 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 5/10 (h) (i) (j) (k) (l) (m) (a) Firearms prohibited; exceptions. No person shall carry or transport firearms, gas, air, or spring- activated guns, explosives, flammable material or dangerous weapons except when such firearms, guns or weapons are encased by transshipment. This section shall not apply to peace officers and other persons who are authorized by federal, state or municipal laws to be armed. Plans and specifications for hangars, shops or other buildings. Plans and specifications for hangars, shops or other buildings to be constructed on the airport shall be submitted to the commission for approval. Location and height shall conform to the airport master plan and current FAA regulations. Right to regulate. The commission has the right to and does regulate all commercial enterprises using the airport as a basis of operation, whether such operation is aeronautical or nonaeronautical in nature. No commercial operation of any kind or type shall be conducted on the airport unless specifically authorized by the commission. Flying club. A flying club is recognized as a plan for the joint ownership of aircraft and the fair distribution of the cost of maintaining and operating such aircraft. Such operation is not considered to be a commercial venture when so operated. Neither is flight instruction by club members for other club members considered to be commercial in nature so long as there is no profit or for-hire motive involved in the operation. In all cases, the commission will determine if the operation of a flying club or other such organization is commercial. If determined to be commercial, the club shall conform to the requirements set forth in this article for commercial fixed base operators. Use of airport or any of its facilities. The use of the airport or any of its facilities in any manner shall create an obligation on the part of the user to obey all the regulations provided in this article and adopted by the commission. The privilege of using the airport and its facilities shall be conditioned on the assumption of full responsibility and risk by the user; and such use shall release and hold harmless and indemnify the commission, its officers and employees, from any liability or loss resulting from such use, as well as to claims of third persons using the airport. The privilege of using the airport shall be upon the further condition that any person desiring to use the airport shall maintain a current policy of indemnity against personal injury and property damage in a reasonable amount. Solicitations. No person shall solicit funds for any purpose, and no signs or advertisements may be posted at the airport without permission of the commission. (Ord. No. 130, § 2, 2-15-1988) Sec. 6-74. - Fire and safety. The following fire and safety regulations shall apply to all persons, aircraft, equipment and facilities at the airport: 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 6/10 (1) (2) (3) (4) (5) (a) (b) (c) (a) (b) (c) Smoking or lighting of an open flame is prohibited at places with posted signs, or within 50 feet of hangars (lounge area excepted), fuel trucks, fuel loading stations and tank farms. No person shall start an open fire at any place on the airport property without permission of the airport manager. No persons shall store material or equipment, use flammable liquids or gases, or allow their premises to become in such condition so as to violate in any manner the fire code in force in the area of the airport. The storage of paint thinners, fuels or other such volatile materials in hangars is prohibited. Tenants of all hangars and buildings shall provide suitable extinguishers and equipment, and they shall be kept in good condition. Tenants and persons are required to keep their premises clean and clear of all rubbish, junk, debris, old aircraft and vehicles, and unsightly objects. (Ord. No. 130, § 3, 2-15-1988) Sec. 6-75. - Motor vehicle regulations. Operation of automotive vehicle. Unless authorized by the airport manager, no highway or automotive vehicle shall be operated on the airport except on roadways and parking areas. Surface vehicles. No surface vehicles shall be permitted on the runways or taxiways without the express permission of the airport manager or commission unless the operation of such vehicles is in accordance with prior agreement to accomplish a necessary airport purpose, service or inspection. Operation of vehicles. No person shall operate any vehicle in a careless or negligent manner or in disregard for the safety of others, or in excess of posted speed limits. All aircraft have the right- of-way over all surface vehicles. (Ord. No. 130, § 4, 2-15-1988) Sec. 6-76. - Regulations governing airport operations. FAA rules and regulations governing. All FAA rules and regulations governing the operation of aircraft in effect as of February 15, 1988, as well as all additions to such rules and regulations, are made a part of this article as fully as if set forth in this article. Running of aircraft engines. At no time shall aircraft engines be run up when hangars, shops, airplanes, or other buildings or persons are in the path of the propeller stream and/or jet exhaust. Parking of aircraft. No aircraft shall be parked or stored at the airport except in the areas designed for such use. 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 7/10 (d) (e) (f) (g) (h) (i) (j) (k) (1) (2) Performance of aircraft; engine repair and maintenance. The performance of aircraft and engine repair and maintenance is considered to be an aeronautical service regulated by the commission except where such services or repairs are performed by the aircraft owner or his employees. The commission reserves the right to designate reasonable areas where such aircraft owners may perform services on their own aircraft outside county-owned hangars. Accident. In the event of an accident, the commission, through the airport manager, may, in compliance with FAA and other governmental regulations, move damaged aircraft from the landing areas, ramps, aprons or other areas at the expense of the owner and without liability for damage resulting from such moving. Report of accident by pilot. The pilot of an aircraft involved in an accident on or near the airport causing personal injury or property damage shall report to the airport manager and other appropriate authorities. If the pilot is not able to do so, the owner of the aircraft or his agent shall make such report. Payment for damaged or destroyed property. Airport property damaged or destroyed by an accident or otherwise shall be paid for by the parties responsible. Taxiing aircraft. No person shall taxi an aircraft until he has ascertained by visual inspection of the area that there will be no danger of collision with any person or object in the immediate area. Speed of taxiing aircraft. Aircraft shall be taxied at a safe and reasonable speed with due respect for other aircraft, persons or property. Takeoffs and landings. Unless an emergency situation is present, all takeoffs and landings shall be confined to the runways. Persons permitted to enter landing area proper, taxi space or aprons. No person, except airmen, duly authorized personnel, passengers going to or from aircraft, or persons being personally escorted by airport attendants shall be permitted to enter the landing area proper, taxi space or aprons. This does not, however, give any person so excepted the privilege of unrestricted use of the airport. These privileges are confined to the necessary use of these areas in connection with the flights, inspections and routine duties. (Ord. No. 130, § 5, 2-15-1988) Sec. 6-77. - Regulations governing ultralight vehicle operations. The operation, either landing or taking off, of the class of aircraft or vehicle known commonly as ultralights, is prohibited on the airport unless all of the following provisions are met: Compliance with current regulations. The operator of each ultralight vehicle shall comply with the current provisions of part 103 of the Federal Aviation Regulations. Additional requirements. In addition to the requirements of part 103, each operator or 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 8/10 a. b. c. (a) (b) (c) (d) (e) (a) (b) potential operator shall comply with the following: Each person operating an ultralight vehicle shall maintain vigilance so as to see and avoid aircraft and shall yield the right-of-way to all aircraft. All ultralight vehicles operating at the airport shall be equipped with an operational two- way radio. In lieu of a two-way radio, the pilot must notify the airport manager of flight intentions before operating on or in the vicinity of the airport. Prior to conducting any ultralight vehicle operations to or from the airport, each operator of each ultralight vehicle shall purchase and keep in force public liability insurance in a reasonable amount. (Ord. No. 130, § 6, 2-15-1988) Sec. 6-78. - Fueling. Authorized personnel. Only authorized personnel shall be permitted in the immediate vicinity of an aircraft while the aircraft is being fueled or defueled. Running of engine while fueled or drained. No aircraft shall be fueled or drained while the aircraft engine is running or while the aircraft is in a hangar or an enclosed area. Aircraft grounding during fueling operations. During all fueling operations, the aircraft shall be grounded by an approved method. Smoking or lighting of open flame prohibited during fueling operation. Smoking or lighting of an open flame shall be prohibited within 50 feet of any fueling operation. Fuel storage and dispensing equipment. No fuel storage and dispensing equipment shall be installed and used at the airport without the prior written approval of the commission. All such equipment shall be of a modern design and shall be kept in a safe and nonleaking condition. (Ord. No. 130, § 7, 2-15-1988) Sec. 6-79. - Aircraft operations. Regulations. No aircraft shall be parked, stored or repaired at the airport except in the areas designated for such use by the manager or the commission. Moving of aircraft. At the direction of the airport manager, the operator, owner or pilot of any aircraft on the airport shall immediately move the aircraft from the place where it is parked or stored to any other place designated on the airport for the parking of aircraft. (Ord. No. 130, § 8, 2-15-1988) Sec. 6-80. - Minimum standards governing all xed base operations. 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 9/10 (a) (b) (c) (a) (1) (2) (3) (4) (5) (6) (7) (a) (b) (c) Fixed base operations. All fixed base operations shall be progressive business enterprises, with manned office, telephone and restroom facilities at the airport. Lease agreement of fixed base operator. No fixed base operator shall be allowed to operate on the airport without a fully executed lease agreement with the commission. Insurance coverage requirement. All fixed base operators shall maintain at least $1,000,000.00 of airport liability insurance with the commission listed as a named insured. (Ord. No. 130, § 9, 2-15-1988) Sec. 6-81. - Procedures for receiving and processing applications for commercial operations. Any applicant wishing to establish an aeronautical activity on the airport shall be furnished a copy of this article and shall make application in writing to the commission, setting forth in detail the following: The name and address of the applicant. The proposed land use, facility and/or activity sought. The names and the qualifications of the personnel to be involved in conducting such activity. The financial responsibility and technical ability of the applicant and operator to carry out the activity sought. The tools, equipment, services and inventory, if any, proposed to be furnished in connection with such activity. The requested or proposed date for commencement of the activity and the term of conducting the activity. The estimated cost of any structure or facility to be furnished, the proposed specifications, and the means or method of financing such construction or acquisition of facilities. (Ord. No. 130, § 10, 2-15-1988) Sec. 6-82. - Special airport uses. Establishment of rules to be met by all users. The commission has established the rules outlined in this article to be met by all users so as to provide for the safe and efficient use of the airport and to otherwise protect the safety of persons and property both on the ground and in the air. No operation of nonpowered aircraft. No operations involving nonpowered aircraft, including gliders, balloons, parachuting, and other unusual and special classes of aeronautical activities, will be permitted on the airport without the prior written approval of the commission. No operation of banner towing. No operations involving banner towing will be permitted on the airport without the prior written approval of the commission. 4/27/23, 2:54 PM Pickens County, SC Code of Ordinances about:blank 10/10 (d)Request for nonaviation uses of airport property. Requests for nonaviation uses of the airport property must be approved by the commission in writing prior to the activity. It is the policy of the commission to limit such approval to an absolute minimum. (Ord. No. 130, § 11, 2-15-1988) Sec. 6-83. - Promulgation. At least annually, the commission shall advise the county council of the necessity for any additions, amendments or deletions to this article. (Ord. No. 130, § 12, 2-15-1988)

Source: Pickens County website. First collected Nov 14, 2026.