Committee of the Whole Meeting — Agenda Packet
Pickens County · Pickens County · Pickens County Council · meeting of Feb 21, 2023 · Agenda packets
Open the original document More from Pickens County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
222 MCDANIEL AVENUE, B-1 ∙ PICKENS, SC 29671 ∙ 864.898.5856 ∙ WWW.CO.PICKENS.SC.US
COUNCIL MEMBERS
CHRIS BOWERS, CHAIRMAN
ROY COSTNER, VICE CHAIRMAN
ALEX SAITTA, VICE CHAIR PRO-TEM
C. CLAIBORNE LINVILL
CHRIS LOLLIS
HENRY WILSON
COUNTY ADMINISTRATOR
KEN ROPER
CLERK TO COUNCIL
MEAGAN NATIONS
PICKENS COUNTY COMMITTEE OF THE WHOLE MEETING
Tuesday, February 21, 2023
6:00 PM
Main Conference Room, County Administration Facility
222 McDaniel Avenue, Pickens SC 29671
All meetings of Pickens County Council are held in accordance with the South Carolina Freedom of Information Act,
Section 30-4-70, et seq. of the Code of Laws of South Carolina, 1976, as amended, as well as the Organizational
Rules for Pickens County Council.
1. WELCOME AND CALL TO ORDER: Chairman Chris Bowers
INVOCATION AND PLEDGE OF ALLEGIANCE: Councilman Chris Lollis
2. COMMITTEE OF THE WHOLE:
a. Log No. 133 – Solid Waste Needs
b. Log No. 141 – UDSO
3. ADJOURN
Committee of the Whole Log
Updated 02/14/2023
Log Number Description Date Refferred Meeting Date(s) Action
2/22/2022 ◘ No action taken by Committee.
10/17/2022
◘ Chairman Chris Bowers made a motion to put out an
RFP for either/or the Project 25 UHF Standalone System
and the Project 25 800 MHz Standalone System. Motion
was seconded by Councilman Ensley Feemster and
carried unanimously (6-0).
10/15/2018 ◘ Committee recommends staff working with the
Historical Society to explore the logistics of the location
and report back to Committee. No action taken by
Committee.
8/19/2019 ◘ No action taken by Committee.
123 AN ORDINANCE No. 572 AMENDING
ARTICLE I OF CHAPTER 34 OF THE
PICKENS COUNTY CODE OF
ORDINANCES SO AS TO PROVIDE
REMEDIES AND PENALTIES FOR
ILLEGAL LITTER AND DUMPING IN THE
UNINCORPORATED AREAS OF
PICKENS COUNTY, AND MATTERS
RELATED THERETO.
5/13/2019 3/21/2022 ◘ No action taken by Committee.
12/16/2019 ◘ No Action Taken by the Committee.
109 Fort Prince George 10/1/2018
80 County Radio System 11/6/2017
10/7/2019133 Solid Waste Needs
1
Committee of the Whole Log
Updated 02/14/2023
3/15/2021 ◘ Councilman Trey Whitehurst made a motion to
approve moving an allocation of $358,400 from fund
balance, for this capital project, forward into this year’s
budget for Solid Waste. Motion was seconded by
Councilman Ensley Feemster and carried unanimously
(6-0).
7/19/2021 ◘ No Action Taken by the Committee.
1/21/2020 ◘ No Action Taken by the Committee.
1/25/2021 ◘ No Action Taken by the Committee.
3/16/2020 ◘ Meeting cancelled due to COVID-19 Special Called
Meeting.
2/16/2021 ◘ No Action Taken by the Committee.
11/19/2022 ◘ No Action Taken by the Committee.
◘ Vice Chairman Roy Costner made a motion for a 6-
month Moratorium, with an option to be extended out
90 days, to be moved out of Committee and for staff to
provide recommendation on development size. Motion
was seconded by Henry Wilson and carried
unanimously (6-0).
◘ After more discussion, Chairman Chris Bowers made a
motion for First Reading in Title Only to amend the
UDSO and return to Committee for further discussion.
Motion was seconded by Vice Chairman Roy Costner
and carried unanimously (6-0).
2/10/2020 ◘ No Action Taken by the Committee.
8/17/2020 ◘ Vice Chairman Chris Bowers made a motion to implement a
Memorandum of Understanding, laying out a plan on how
Reverend Moss will implement the facility. Motion was
seconded Councilman Whitehurst and carried unanimously (6-
0).
10/7/2019
134 Mental Health 10/7/2019
133 Solid Waste Needs
141 UDSO 2/3/2020
Discussion on Old Jail142 2/3/2020
1/17/2023
2
Committee of the Whole Log
Updated 02/14/2023
3/21/2022 ◘ Chairman Chris Bowers made a motion to allocate funding,
totaling $98,000 towards this project at the Old Stockade.
Councilman Trey Whitehurst seconded the motion. The
motion carried (5-1), with Councilman Alex Saitta opposed.
8/30/2021 ◘ No Action Taken by the Committee.
9/20/2021 ◘ Chairman Chris Bowers made a motion to use
American Rescue Act Funding towards the first bill from
the Broadband Project and towards twenty (20) Solid
Waste Containers for the Solid Waste Department.
Motion was seconded by Councilman Alex Saitta and
carried (5-0).
◘ Chairman Chris Bowers made a motion to go into
executive session to discuss one-time funding for
county employees out of American Rescue Act Funding.
Motion was seconded by Vice Chairman Roy Costner
and carried (6-0).
◘ (second motion) Chairman Chris Bowers made a motion
to recommend to move forward to council meeting
American Rescue Act Funding compensation 5/25/2/1
plan and to exempt county council from the plan.
Motion was seconded by Vice Chairman Roy Costner
and carried (6-0).
◘ Vice Chairman Roy Costner made a motion to use the
lost revenue to purchase a bailer for $750,000. Motion
was seconded by Councilman Alex Saitta and carried
unanimously (6-0).
◘ Councilman Alex Saitta made a motion to amend to
add a refund of $75,000 for the Clean Up Pickens
Program. Motion was seconded by Roy Costner and
carried unanimously (6-0).
Discussion on Old Jail142 2/3/2020
177 American Rescue Act Funding 6/7/2021
10/18/2021
11/15/2021
3
Committee of the Whole Log
Updated 02/14/2023
◘ Councilman Henry Wilson made a motion for staff to
create a process for Non-Profits to apply for ARPA
funding based on the principles set forth. Motion was
seconded by Chairman Chris Bowers. The motion
carried (4-2), with Councilman Alex Saitta and
Councilman Trey Whitehurst opposed.
178 Hagood Mill MOU 6/14/2021
9/20/2021 ◘ Chairman Chris Bowers made a motion to bring in
Liberty City Dispatch for the reasons Chief Gibson
explained, for Emergency Services to continue to give
updates to Council, and to include the updates in
Administrator Roper’s report each month. The motion
was seconded by Councilman Henry Wilson and carried
unanimously (5-0).
10/18/2020 ◘ No Action taken by the Committee.
2/22/2022 ◘ No Action taken by the Committee.
196 Arial Mill Rehab Project 2/7/2022
203 Updating County Tire Policy Per
DHEC Requirement
5/3/2022
208 County Employee Handbook 8/8/2022
209 County Constables and
Certification Process
10/3/2022 10/17/2022 ◘ Councilman Henry Wilson made a motion to table for
future consideration. Motion was seconded by
Councilman Ensley Feemster and carried (5-1), with
Councilman Alex Saitta opposed.
177 American Rescue Act Funding 6/7/2021
11/15/2021
182 Unified Dispatch Plan from Staff 9/13/2021
4
1
UDSO Review
GROWTH
OVERVIEW
The recent wave of growth in Pickens County has elicited concern among staff, leadership, and citizens in regard to ensuring
that proper protections are in place to manage this growth in a sustainable fashion that is in keeping with the vision the
leadership has for the County.
POSSIBLE SOLUTIONS & ASSOCIATED IMPACTS
1. Consider introducing a base level of zoning for the County to allow certain types of development in certain areas and
limit or deny certain types of developments in other areas.
The effect of this change would be to provide the County with a mechanism to determine where certain activities were
allowed.
2. As an alternative, consider establishing overlay districts along the Highway 93 and Highway 123 corridors that include
properties touching or within 1000’ of the 123 and 92 Right-of-Ways.
The effect of this change would be to provide the County with a mechanism to determine where certain activities were
allowed.
3. Consider establishing a transition zone touching or within 1000’ of the municipal boundaries of Easley, Liberty,
Central, and Clemson.
The effect of this change would be to provide the County with a mechanism to determine where certain activities were
allowed.
4. Follow the Comprehensive Plan and encourage/allow high density (50 or more units/lots per acre) closest to Easley,
Liberty, Central, and Clemson and discourage it elsewhere in the County.
The effect of this change would be allow the Comprehensive Plan to be a guiding document and to protect the County
from high density housing.
5. Meet with those municipalities to discuss their intentions and concerns regarding growth and express ours. Use this
meeting to further our growth conversations and talk about capacity for sewer, fire/rescue, schools, land fill, etc.
The effect of this would be allow the Comprehensive Plan to be a guiding document and to approach the challenge of
growth in a spirit of partnership with our municipalities.
6. See if the County and municipalities can collectively develop a “capacity for development map” which will largely be
driven by access to sewer and transit – which may mean that the most intensive growth will not be in the County and it
may reveal that there is less room for growth around the Cities than some may think.
The effect of this change is to honor the objectives of the Comprehensive Plan and to strengthen our relationship with
the municipalities within the County.
2
UDSO Review
7. Propose that we either continue to NOT allow high density in the County and therefore encourage annexation if the
Cities will agree to our “terms” OR
8. Develop standards for the “transition zone” that are comparable to developing within the various City limits and which
address some of our concerns.
The effect of these changes would be to help direct high density growth where and how the County wants it.
9. Regardless of which path is taken for controlling where growth occurs, ensure that developments over 50 lots or
dwelling units have incentives in place for an affordable/workforce housing component – which the County defines.
(see Housing)
The effect of this would be to help move the County towards greater possibilities of providing work force/affordable
housing.
10. Leave the rest of the basic content of the ordinance as it is in regard to open space, planned developments and
conventional subdivisions with some modifications to make these ordinances more contemporary.
The effect of this would be to continue to provide sustainable options for development to a spectrum of development
scales.
1
UDSO Review
HOUSING
OVERVIEW
The wave of growth Pickens County is experiencing is causing concerns regarding the appropriateness of the types of housing being built
and the potential exclusion of workforce/affordable housing.
POSSIBLE SOLUTIONS & ASSOCIATED IMPACTS
1. Review the existing Conventional Subdivision Ordinance and consider modifying it to limit such subdivisions to 10 lots.
The effect of this change would be to allow families and smaller developments to continue under the existing standards while
promoting more sustainable Open Space Subdivisions for larger developments.
2. Review the existing Open Space Subdivision ordinance to determine the appropriateness of the amount of open space required,
further define open space, possibly require a percentage of that open space to be protected/preserved for the duration of
development.
The effect of this change would be for the County to better ensure that the intentions behind an Open Space Development are
actualized.
3. Revise the existing Townhome Ordinance.
The effect of this change would be to make the language related to townhomes more in keeping with current development
patterns and to provide guardrails to better protect the County, to give the Planning Commission better standards to apply, and to
provide property owners and developers a more consistent set of expectations.
4. Consider a “RV as permanent dwelling” ordinance.
The effect of this change would be to provide standards and guidelines for the heavy influx of people wishing to live in a camper
or RV year-round. Staff has discussed this consideration with other departments and developed a draft ordinance.
5. Define what the County means by “tiny home” and develop an ordinance for tiny home developments.
The effect of this change would be to ensure everyone is on the same page regarding what a “tiny home” is and to introduce for
the first time any standards or guidelines for building a tiny home development. For example: Tiny house means a dwelling not
on wheels which is less than 700 square feet and is to be used as permanent housing with permanent provisions for living,
sleeping, eating, cooking, and sanitation built in accordance with the adopted building code.
6. Provide a definition of what Pickens County considers to be workforce/affordable housing.
The effect of this change is to clarify what Pickens County means when discussing workforce/affordable housing.
For example: In order for a housing unit to be considered affordable its cost (rent, mortgage, taxes, insurance, and utilities) must
not exceed 30% of a person's annual income of a resident who earns between 40% and 80% of Pickens County's average
median household income, which was $53,188 in 2020 according to the Census Bureau.
7. Consider an incentive program whereby a developer may be granted increased density, a reduction in taxes, or a reduction in
open space requirements in exchange for the provision of work force/affordable housing.
The effect of this change is to acknowledge that South Carolina does not have an inclusionary zoning act and, as such,
jurisdictions cannot require affordable housing. In light of that limitation, the County can provide incentives to entice developers to
electively include workforce/affordable housing under certain circumstances.
1
UDSO Review
Traffic AND INFRASTRUCTURE
OVERVIEW
The wave of growth Pickens County is experiencing is putting a strain on some of our existing infrastructure systems as well
as a potential strain on all of our systems. This includes roadway capacity and signalization, fire and rescue, police, schools,
landfills, water and sewer, staffing related to planning, engineering, stormwater, codes, and enforcement.
POSSIBLE SOLUTIONS & ASSOCIATED IMPACTS
1. Establish a matrix which determines the type and scope of traffic studies that must accompany various types of
development.
The effect of this change is that it provides consistency for staff, the Planning Commission, Council, citizens and
developers and ensures the County is obtaining the most meaningful data regarding the traffic impact a project has on
the immediate area and beyond (or “downstream”).
2. State clearly in our rules of procedure for the Planning Commission that when a traffic study is required that the
applicant understands that in order for their project to be approved the applicant will be responsible for implementing
any and all improvements or modifications the County Engineer recommends/requires as a result of the study.
The effect of this change is to ensure that all developers know from the outset that they will be responsible for helping
to mitigate any negative traffic impacts their project will have on the community.
3. Review the current Pickens County Road Ordinance for possible improvements.
The effect of this change will be to bring the current Road Ordinance into line with best practices.
4. All common drives and private roads shall be accompanied by a 50’ ROW easement and be built to the same
standard as a public road.
The effect of this change is to discourage private roads and common drives and to make it easier for future leadership
to accommodate requests for the County to take over common drives and roads.
5. For each department or agency impacted by a new subdivision, require review and sign-off by the appropriate
department or agency prior to the project being brought to the Planning Commission for review and recommendation.
The effect of this change is approach development in a holistic manner ensuring that our ability to provide essential
services can keep up with growth.
6. Work with GPATS, SCDOT and others to maintain a thorough plan of action for roadway repairs, improvements, and
additions, alternate transportation features such as bikeways, transit, and general mobility throughout the County.
The effect of this would be to plan and budget for a healthy transportation system within the County. This would
include standards and conditions by which curb cuts are allowed and/or frontage roads are required.
1
UDSO Review
GENERAL improvements
OVERVIEW
The current UDSO is 13-years old and while it has been updated multiple times since its original adoption there is still room for
improvement.
POSSIBLE SOLUTIONS & ASSOCIATED IMPACTS
1. Review the UDSO for general consistency and accuracy.
The effect of this change is a clearer, more consistent, and accurate document.
2. Identify specific areas for review and updates such as waterway and tree canopy protection or replinishment.
The effect of this change is to address a wide range of issues that would benefit from some tweaking.
3. Consider some organizational changes to the UDSO and the potential introduction of a matrix that addresses
setbacks, lot sizes, and frontages.
The effect of this change would be to make it easier for people to locate and apply commonly used standards in the
ordinance.
4. Review with DHEC any changes in standards for the minimum area needed for septic.
The effect of this change would be to see if our 14-year old document is in keeping with best practices.
5. Merge the existing Road Ordinance with language in the existing UDSO.
The effect of this change would be to limit inconsistencies between the two documents.
1
UDSO Review
development
OVERVIEW
The wave of growth Pickens County is experiencing is causing concerns about the ability for the County to fund essential
services both currently and as a result of the growth.
POSSIBLE SOLUTIONS & ASSOCIATED IMPACTS
1. Conduct a complete internal and cross-departmental fee review of all existing development related fees collected in
the County.
The effect of this will be to allow Council to better evaluate if our current fees are in line with our current needs.
2. Hire a consulting firm to evaluate existing fees as well as the possibility of impact fees including a review of what
neighboring Counties are doing in regard to fees and impact fees.
The effect of this effort will be to see what – if any – financial role developers should play in mitigating the financial
hardships the County may face due to rapid growth.
1
UDSO Review
Recommended plan of action
1. Follow the Comprehensive Plan and encourage/allow high density (50 or more units per acre) only in areas closest to
Easley, Liberty, Central, and Clemson and the 123/93 corridors.
2. Meet with those four municipalities to discuss their desires and concerns related to growth and express ours. Use this
meeting to further our growth conversations and talk about our joint capacity for sewer, fire/rescue, schools, land fill,
etc.
3. See if we can collectively create a “capacity for development map” which will largely be driven by sewer and transit.
This may mean that most of the intensive growth will not be in the unincorporated County and that due to limitations
based on infrastructure there may well be less potential for growth in and around the cities than some may think.
4. Propose that we either continue to NOT allow high density in the County and therefore encourage municipal
annexation if the cities will agree to our “terms” (which will include municipalities taking over any County roads on land
the cities annex).
OR
5. Develop standards for “transition zones” that are comparable to developing within the various city limits and, therefore,
a.) address some of our concerns and b.) dissuade developers from first building in the County and then leaving to
join a city.
6. Consider an overlay district or districts that include properties touching or within 1000’ of the 123 and 92 ROW’s
and/or touching or within 1000’ of the municipal boundaries of Easley, Liberty, Central, or Clemson.
7. These districts would allow for higher density growth with suitable standards.
8. Regardless of if Council elects to pursue #4 or #5 above (or something else Council wishes to employ) ensure that all
developments over 50 homes or units have potential through incentives to include an affordable/workforce housing
component. We can use standard measures for what is “affordable”. For example: In order for a housing unit to be
considered affordable its cost (rent, mortgage, taxes, insurance, and utilities) must not exceed 30% of a person's
annual income of a resident who earns between 40% and 80% of Pickens County's average median household
income, which was $53,188 in 2020 according to the Census Bureau. Tax abatements are one traditional method of
providing incentives for affordable housing.
9. Leave the rest of the basic content of the UDSO as it is in regard to Open Space, Planned Developments and
Conventional Subdivisions with a few exceptions:
A.) limit conventional subdivisions to 10 units. This promotes Open Space development.
B.) Modify the Open Space ordinance to require 25% open space (up from 20%) of which 75% has to remain fenced
off during construction and considered as “protected” moving forward.
C.) Develop some sort of easier to read/follow matrix that addresses setbacks, lot sizes, frontages.
D.) Review with DHEC any changes in standards for minimum area needed for septic.
E. Review County ordinances for ways to strengthen our protection/replacement of our tree canopy and strengthen
our standards for protecting our waterways.
2
UDSO Review
10. Refine and submit the current drafts of our townhome, RV and Tiny Home ordinances with clear definitions of what we
mean by these terms.
11. Establish clear and realistic standards for the specific type and scope of traffic studies required based on a project’s
size and road type adjacency.
12. Make clear when and at what scale a traffic study will automatically be required to make it less emotional and/or
subjective and also make clear that any recommendations that the County Engineer makes as a result of a traffic
study will have to be implemented by the developer if they want to proceed.
13. Review UDSO Section 10 (Roads) for improvements with specific attention being paid to the common, shared private
drive language and standards.
14. Work with GPATS, SCDOT and others to maintain a thorough plan of action for roadway repairs, improvements, and
additions, alternate transportation features such as bikeways, transit, and general mobility throughout the County.
15. Encourage a County-wide fee study of all existing fees and explore the introduction of impact fees.
Pickens County Solid Waste
Landfill Expansion
For Pickens County the lack of landfill space for our C&D can now be remedied within the footprint of our
existing landfill. We received notification from SCDHEC, Compliance Letter 011723, on January 17, 2023.
This compliance letter stipulated that by February 17, 2023, we Must demonstrate that additional volume
exists, initiate closure of the landfill, or submit an expansion package. On February 2, 2023, Demonstrat ion
of Need was filed with SCDHEC to begin the expansion permitting.
Our proposed expansion area is 65.9 acres. We expect to be permitted for at minimum 75% or 49.4 acres.
With our shredders and proposed landfill equipment, this will afford the tax payers of Pickens County 50+
years of landfill space. In order to achieve this air space addition, we MUST do our work correctly. This means
using the proper equipment, in the proper manner, to achieve maximum compaction.
Proper equipment to perform the landfill tasks to its full efficiency are needed. We have listed the equipment,
with cost as follows:
The first piece of equipment is the Cat D8 WHA Dozer. This is a true landfill dozer with a full landfill package.
In the past we have purchased equipment not made for the job, and the equipment spent as much or more
time down as it did running. The cost of this dozer is $1,046,000.00
The most important piece of equipment is the landfill compactor. This piece of equipment gives us the most
compactive effort allowing us the biggest air space savings over time. The TANA H380eco is the pinnacle of
compactors. The cost for this machine is $908,000.00
Now that we have purchased a 2
nd shredder, another excavator is needed to feed the machine. We have
leased a SANY SY215C for the last 5 months to complete the reclamation work on site, and our vendor has
given us a used price on this new machine. They have discounted the lease from the sale price. The cost of
this machine is $142,000.00
The total cost including expansion is $2,279,000.00. In 5 years the saved tipping fees to Greenville County
of half a million dollars per year would give return on investment. Extra ROI savings would come from non-
trucking of C&D.
Recycling
We continue to strengthen our recycling program, though the pricing indexes continue to shrink. The current
market trends do show some growth of cost in products, but still do not cover our costs. Our residents have
done a much better job of helping with our plastics sorting. This has allowed us to sell a portion of our plastics.
We, as all other recyclers in the Nation, work to provide these services to our residents. We will continue to
do so, until the markets determine it’s no longer cost effective.
Pickens County Solid Waste
Tipping Fees
As discussed during ADHOC meetings, we are very unbalanced on our municipal tipping fees. After much
discussion with our Finance Director, we feel that all municipalities in Pickens County pay the full $47.00 per
ton fee for all items except for brush. For brush the full $29.50 per ton fee be levied.
If a resident lives outside an unincorporated municipality, they pay for contract pick up. Those contractors
pay the full tipping fee. The municipalities charge residents within the incorporated municipality a fee for
collecting and disposing of their waste, yet some pay a very small yearly fee, while some pay no fee at all.
We find this to be very unbalanced and unfair to all residents that pay a disposal cost.
Saturday Operating Cost
Source: Pickens County website. First collected Nov 14, 2026.