Development Review Committee Meeting — Agenda Packet
Town of Bluffton · Beaufort County · Development Review Committee · meeting of Feb 4, 2026 · Agenda packets
Open the original document More from Town of Bluffton
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Development Review Committee Meeting
Wednesday, February 04, 2026 at 1:00 PM
Theodore D. Washington Municipal Building, Henry “Emmett” McCracken Jr. Council Chambers,
20 Bridge Street, Bluffton, SC
AGENDA
All Applications can be viewed on the Town of Bluffton’s Permit Finder page
https://www.townofbluffton.us/permit/
I. CALL TO ORDER
II. ROLL CALL
III. PUBLIC COMMENT
IV. OLD BUSINESS
V. NEW BUSINESS
1. 1181 May River Road (Development Plan): A request by Nathan Sturre of Sturre Engineering.
on behalf of property owner Trevor Wells for review of a Preliminary Development Plan
application. The project consists of the construction of a two-story 8,000 SF mixed use
building with associated infrastructure. The property is zoned Neighborhood Core and consists
of 1.4 acres identified by tax map number 6610 039 000 097A 0000. (DP-06-25-019806) (Staff
- Dan Frazier)
VI. DISCUSSION
VII. ADJOURNMENT
NEXT MEETING DATE: Wednesday, February 11, 2026
Page 1
Town of Bluffton, SC Development Review Committee Meeting Agenda February 04, 2026
“FOIA Compliance – Public notification of this meeting has been published and posted in compliance
with the Freedom of Information Act and the Town of Bluffton policies.”
In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the
Town of Bluffton will not discriminate against qualified individuals with disabilities on the basis of
disability in its services, programs, or activities. The Town of Bluffton Council Chambers are ADA
compatible. Auditory accommodations are available. Any person requiring further accommodation
should contact the Town of Bluffton ADA Coordinator at 843.706.4500 or
adacoordinator@townofbluffton.com as soon as possible but no later than 48 hours before the
scheduled event.
Executive Session – The public body may vote to go into executive session for any item identified for
action on the agenda.
*Please note that each member of the public may speak at one public comment session and a form must
be filled out and given to the Town Clerk. To submit a public comment online, please click here:
https://www.townofbluffton.sc.gov/FormCenter/Town-15/Public-Comment-60
Public comment is limited to 3 minutes per speaker.
Page 2
PLAN REVIEW COMMENTS FOR DP-12-25-020070
Town of Bluffton
Department of Growth Management
20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910
Telephone 843-706-4522
Plan Type: Apply Date:
Plan Status: Plan Address: 1181 A May River Road
BLUFFTON, SC 29910
Development Plan
Pending
12/23/2025
Plan PIN #:Case Manager: R610 039 000 097A 0000Dan Frazier
Plan Description: A request by Nathan Sturre of Sturre Engineering. on behalf of property owner Trevor Wells for review of a
Preliminary Development Plan application. The project consists of the construction of a two-story 8,000 SF
mixed use building with associated infrastructure. The property is zoned Neighborhood Core and consists of
1.4 acres identified by tax map number 6610 039 000 097A 0000. (DP-06-25-019806) (Staff - Dan Frazier)
STATUS: This item will be heard at the February 4, 2026 Development Review Committee meeting.
Technical Review
Submission #: 1 Received: 12/23/2025 Completed: 01/30/2026
Reviewing Dept. Complete Date StatusReviewer
Revisions Required01/20/2026Fire Department Review Dan Wiltse
Comments:
1. Revise turning exhibit, or proposed parking lanes, to demonstrate that emergency vehicles can maneuver through site and
remain within the proposed parking lanes.
2. Verify use of existing structures. How are they accessed? How are they accounted for in the Parking Study?
Revisions Required01/22/2026Watershed Management Review
DRC
Samantha Crotty
Comments:
1. Revise narrative to remove the "no state post-construction requirements" verbiage and "There is no additional onsite detention
requirement per the SoLoCo Compliance Calculator. "
2. Revise narrative to state post-development peak discharge control for the 2, 10, 25, 50, and 100-year 24-hour storm events.
(SWDM 3.5.2)
3. The site must meet the compliance calculator TSS removal requirements, at a minimum. This is also a state requirement.
4. Based on the geotechnical report, SHGW levels, and proposed pervious pavement detail, it does not appear that any form of
pervious pavement will be feasible for this site.
Approved with Conditions01/29/2026Planning Commission Review Dan Frazier
Comments:
Planning Commission DRC Members provided the following comment:
1. Due to backups that already occur for the gym on site, it is strongly recommended that an entrance/exit or at least an exit to
Jason street is required.
Approved with Conditions01/30/2026Planning Review - Principal Dan Frazier
Comments:
1. Per UDO Table 5.11.3.C., provide data that justifies the proposed 1 parking space per 1,000 SF of Building 2 (Gymnastics
studio) is necessary and reasonable.
2. The proposed HC space adjacent to Building 1 cannot serve as a dedicated residential parking space. Mark it as a retail
space, and identify one of the retail spaces as residential.
3. Excluding HC Parking space, the dedicated residential spaces should be the 8 closest spaces to the residential stairwells.
4. Confirm the 1st floor commercial/office entrance for public (front or back?).
01/30/2026 Page 1 of 2Page 3
Section V. Item #1.
Approved01/30/2026Beaufort Jasper Water and Sewer
Review
Matthew Michaels
Approved01/30/2026Building Safety Review Sidney Holland
Approved01/30/2026Planning Review - Address Diego Farias
Approved01/30/2026Police Department Review Bill Bonhag
Approved01/02/2026Transportation Department
Review
Mark Maxwell
Comments:
No comments
Plan Review Case Notes:
01/30/2026 Page 2 of 2Page 4
Section V. Item #1.
Source: Town of Bluffton website. First collected Nov 14, 2026.