RecordWell Data

Planning Commission Meeting — Agenda Packet

Town of Bluffton · Beaufort County · Planning Commission · meeting of Nov 19, 2025 · Agenda packets

Open the original document More from Town of Bluffton

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Planning Commission Meeting Wednesday, November 19, 2025 at 6:00 PM Theodore D. Washington Municipal Building, Henry “Emmett” McCracken Jr. Council Chambers, 20 Bridge Street, Bluffton, SC AGENDA This meeting can be viewed live on BCTV, on Sparklight Channel 9 and 113 or on Spectrum Channel 1304. I. CALL TO ORDER II. ROLL CALL III. NOTICE REGARDING ADJOURNMENT The Planning Commission will not hear new items after 9:30 p.m. unless authorized by a majority vote of the Commission Members present. Items which have not been heard before 9:30 p.m. may be continued to the next regular meeting or a special meeting date as determined by the Commission Members. IV. ADOPTION OF MINUTES 1. October 22, 2025 Minutes V. PUBLIC COMMENT VI. OLD BUSINESS VII. NEW BUSINESS 1. Adoption of 2026 Planning Commission Meeting Dates: (Staff - Dan Frazier) 2. Adoption of 2026 Development Review Committee Meeting Dates: (Staff - Dan Frazier) 3. Chipotle at May River Crossing (Development Plan): A request by OnPoint Partners, LLC on behalf of First Chatham Bank, for approval of a Preliminary Development Plan application. The project consists of the construction of a single-story 2,385 SF restaurant with associated infrastructure. The property is within the Jones Estate Planned Unit Development (PUD) consists of 1.12 acres identified by tax map number R610 036 000 3211 0000 within the May River Crossing Master Plan at the intersection of May River Crossing Road and Pondberry Road. (DP-08-25-019908) (Staff - Dan Frazier) VIII. DISCUSSION IX. ADJOURNMENT Page 1 Town of Bluffton, SC Planning Commission Meeting Agenda November 19, 2025 NEXT MEETING DATE: Wednesday, December 17, 2025 “FOIA Compliance – Public notification of this meeting has been published and posted in compliance with the Freedom of Information Act and the Town of Bluffton policies.” In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the Town of Bluffton will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities. The Town of Bluffton Council Chambers are ADA compatible. Auditory accommodations are available. Any person requiring further accommodation should contact the Town of Bluffton ADA Coordinator at 843.706.4500 or adacoordinator@townofbluffton.com as soon as possible but no later than 48 hours before the scheduled event. Executive Session – The public body may vote to go into executive session for any item identified for action on the agenda. *Please note that each member of the public may speak at one public comment session and a form must be filled out and given to the Town Clerk. To submit a public comment online, please click here: https://www.townofbluffton.sc.gov/FormCenter/Town-15/Public-Comment-60 Public comment is limited to 3 minutes per speaker. Page 2 Planning Commission Meeting Theodore D. Washington Municipal Building, Henry “Emmett” McCracken Jr. Council Chambers, 20 Bridge Street, Bluffton, SC October 22, 2025 I. CALL TO ORDER Chairman Wetmore called the meeting to order at 6pm. II. ROLL CALL PRESENT Chairman Charlie Wetmore Commissioner Michael Brock Commissioner Rich Delcore Commissioner Daniel Grove Commissioner Will Howard ABSENT Vice Chairman Jim Flynn Commissioner Lydia DePauw III. ADOPTION OF MINUTES 1. September 24, 2025 Minutes Commissioner Delcore made a motion to approve the minutes as written. Seconded by Commissioner Brock. Voting Yea: Chairman Wetmore, Commissioner Brock, Commissioner Delcore, Commissioner Grove, Commissioner Howard All were in favor and the motion passed. IV. PUBLIC COMMENT Jordan Holloway, 1060 S Innovation Dr, Bluffton - Mr. Holloway shared concerns regarding the S Innovation Dr connection being proposed as part of the Novant Health Bluffton Medical Center Development Plan. V. OLD BUSINESS VI. NEW BUSINESS 1. Unified Development Ordinance Amendments (Public Hearing): Amendments to the Town of Bluffton's Municipal Code of Ordinances, Chapter 23, Unified Development Ordinance, Article 5 – Design Standards - Accessory Buildings. (Staff - Angie Castrillon) Chairman Wetmore opened the public hearing. He asked for the first, second and third call for public comment. There were no public comments. The public hearing was closed. Staff presented. The commissioners questioned what would happen to carports structures that are already in place but do not meet the proposed standards. There was discussion regarding the maximum lot coverage percentage being proposed and how to keep them Page 3 Section IV. Item #1. Town of Bluffton, SC Planning Commission Meeting Minutes October 22, 2025 standard across the board. The Commission shared concerns regarding if lot size should be a factor in allowing more than one carport on a site. Commissioner Howard made the motion to recommend approval of the amendments to the Town of Bluffton Code of Ordinances Chapter 23 – Unified Development Ordinance, as submitted by Town Staff with the exception of the Maximum Lot Coverage being proposed. Seconded by Commissioner Delcore. Voting Yea: Chairman Wetmore, Commissioner Brock, Commissioner Delcore, Commissioner Grove, Commissioner Howard All were in favor and the motion passed. 2. Novant Health Bluffton Medical Center (Development Plan): A request by Hilton Head Medical Center, LLC, for approval of a Preliminary Development Plan application. The project consists of a three (3) story 243,800 SF hospital with associated drives, parking, landscape, and utility infrastructure. The property is within the Buckwalter Planned Unit Development (PUD) and consists of approximately 17.8 acres identified by the tax map numbers R610 029 000 2487 0000 and R600 029 000 2410 0000 located west of Buckwalter Parkway south of Bluffton Parkway within the Parkway Corners Initial Master Plan. (DP-07-25-019862) (Staff - Dan Frazier) Staff presented. The applicant was present. There was discussion regarding the Innovation Dr connector being proposed and the concerns with it connecting to a private road. The commissioners questioned if any other secondary access points were considered. Commissioner Brock made a motion to approve the application with the following stipulation: 1.Innovation Drive South cannot serve as the secondary access off-site improvement for the hospital. Seconded by Commissioner Howard. Chairman Wetmore made a motion to amend the motion to include the following to the stipulation: 1. Innovation Drive South, "through the Retreat at Grande Oaks neighborhood", cannot serve as the secondary access off-site improvement for the hospital. Seconded by Commissioner Delcore. Voting Yea to amend the motion: Chairman Wetmore, Commissioner Brock, Commissioner Delcore, Commissioner Grove, Commissioner Howard Voting Yea to the amended motion: Chairman Wetmore, Commissioner Brock, Commissioner Delcore, Commissioner Grove, Commissioner Howard All were in favor and the motion passed. VII. DISCUSSION VIII. ADJOURNMENT Commissioner Howard made a motion to adjourn. Page 4 Section IV. Item #1. Town of Bluffton, SC Planning Commission Meeting Minutes October 22, 2025 Seconded by Commissioner Grove. Voting Yea: Chairman Wetmore, Commissioner Brock, Commissioner Delcore, Commissioner Grove, Commissioner Howard All were in favor and the motion passed. The meeting adjourned at 7:03pm. Page 5 Section IV. Item #1. TOWN OF BLUFFTON 2026 PLANNING COMMISSION Meeting and Application Submission Schedule 2026 Planning Commission Meeting and Application Submission Schedule MEETING DATES APPLICATION SUBMISSION DATES January 28, 2026 December 31, 2025 February 25, 2026 January 28, 2026 March 25, 2026 February 25, 2026 April 22, 2026 March 25, 2026 May 27, 2026 April 29, 2026 June 24, 2026 May 27, 2026 July 22, 2026 June 24, 2026 August 26, 2026 July 29, 2026 September 23, 2026 August 26, 2026 October 28, 2026 September 30, 2026 November 18, 2026** October 21, 2026 December 16, 2026** November 18, 2026 January 27, 2027 December 30, 2026 REGULAR MEETINGS ARE HELD THE 4th WEDNESDAY OF EACH MONTH AT 6:00 P.M. ** The November 25, 2026 meeting will be held one week earlier due to holiday. **The December 23, 2026 meeting will be held one week earlier due to the holiday. Please Note: 1. For submission requirements and information please consult www.townofbluffton.sc.gov or phone (843) 706-4500. 2. The proper forms and filing fee (as indicated on the Master Fee Schedule) must accompany all submittals. Incomplete submittals will NOT be accepted. 3. Meetings will be held on scheduled meeting dates unless otherwise advertised with FOIA compliance. 4. All new applications, required revisions and information relative to previously submitted applications must be submitted four (4) weeks prior to the meeting date in order to be placed on the agenda. Page 6 Section VII. Item #1. TOWN OF BLUFFTON 2026 DEVELOPMENT REVIEW COMMITTEE Meeting and Application Submission Schedule 2026 Development Review Committee Meeting and Application Submission Schedule DRC MEETINGS ARE HELD EVERY WEDNESDAY FROM 1:00 P.M. – 3:00 P.M. APPLICATION SUBMISSION DATES ARE TWENTY (20) BUSINESS DAYS PRIOR TO DRC MEETING DATES Please Note: 1. For applications, submission requirements, and general information, please consult www.townofbluffton.sc.gov or call 843.706.4500. 2. No incomplete submittals will be accepted. 3. The proper forms and filing fee (as indicated on the Master Fee Schedule) must accompany all submittals. 4. Meetings will be held on scheduled meeting dates unless otherwise advertised. 5. Minimum requirements for specific applications or resubmittals are listed on project applications. Meetings are subject to change based on conflicts due to scheduling, meeting locations and observed holidays. Page 7 Section VII. Item #2. PLANNING COMMISSION STAFF REPORT Department of Growth Management MEETING DATE: November 19, 2025 PROJECT: Chipotle at May River Crossing Preliminary Development Plan APPLICANT: OnPoint Partners, LLC PROJECT NUMBER: DP-08-25-019908 PROJECT MANAGER: Dan Frazier Planning Manager Department of Growth Management REQUEST: The Applicant, OnPoint Partners, LLC, on behalf of the property owner First Chatham Bank, is requesting approval of a Preliminary Development Plan application. The project consists of a single-story 2,385 SF restaurant with associated infrastructure (Attachment 1). INTRODUCTION: The property is zoned Jones Estate Planned Unit Development (PUD) and consists of approximately 1.12 acres identified by tax map number R610 036 000 3211 0000 located within the May River Crossing Master Plan (Attachment 2). BACKGROUND: This application is for a Preliminary Development Plan located within the Jones Estate PUD and is subject to the standards set forth in the Jones Estate PUD Development Agreement and Concept Plan, the May River Crossing Master Plan, and the Unified Development Ordinance Sections 5.3 and 5.10 (Attachment 3). As reflected in the revised site plan, the application proposes a 2,385 SF restaurant with a pull-up window and associated parking, accesses, landscaping, and water, sewer, and drainage utilities. The subject property, Parcel A-4, is governed by the May River Crossing Master Plan, as such, any proposed building on this parcel must front the adjacent park amenity. The site is accessible from May River Crossing Road and Pondberry Road within the May River Crossing development. The subject parcel is an outparcel within May River Crossing and utilities have been stubbed to serve this site (Attachment 4). In support of the proposed development, 29 onsite parking spaces are required (Jones Estate PUD, ZDSO 90/3 Modifications Section 5.2.1.1) calculated at 12 spaces per 1,000 SF of gross floor area. The Applicant proposes 27 spaces on-site and utilizing 2 adjacent off-street parking spaces, in an effort to minimize potential impacts to the onsite 52” Live Oak. If the concrete area adjacent to the restaurant is to serve as an outdoor seating patio, three additional parking spaces will be required. The allocation of off-site parking spaces must be provided in the letter of approval from the May River Crossing POA at time of Final Development Plan submittal. Page 8 Section VII. Item #3. November 19, 2025 Page 2 Chipotle at May River Crossing – Preliminary Development Plan Planning Commission The Preliminary Development Plan was reviewed at the October 8, 2025, Development Review Committee (DRC) meeting (Attachment 5). To demonstrate conformance with the May River Crossing Master Plan, the item was reviewed again at the October 22, 2025, DRC meeting (Attachment 6). The Applicant provided a response to comments and revised plans on October 23, 2025. An updated site plan reflecting a minor change in foundation plantings and patio area was provided on October 31, 2025 (Attachment 7 and 4). The subject parcel is within the Highway Corridor Overlay District and will require a Certificate of Appropriateness reviewing landscaping, lighting, and architecture at time of final development plan approval. REVIEW CRITERIA & ANALYSIS: The Planning Commission shall consider the criteria set forth in Section 3.10.3.A of the Unified Development Ordinance in assessing an application for a Preliminary Development Plan. The applicable criteria are provided below followed by Staff Finding(s) based upon review of the application submittals to date. 1. Section 3.10.3.A.1. Conformance with the applicable provisions provided in Article 5, Design Standards. Finding. The property lies within the Jones Estate PUD and therefore is subject to, and in conformance with, the standards set forth in the Jones Estate PUD Development Agreement and Concept Plan, the May River Crossing Master Plan, and the Unified Development Ordinance Sections 5.3 and 5.10. 2. Section 3.10.3.A.2. The proposed development shall be in conformance with any approved Development Agreement, PUD Concept Plan, PUD Master Plan, Subdivision Plan, or any other agreements or plans that are applicable. Finding. Town Staff finds that the Preliminary Development Plan is in conformance with the Jones Estate PUD Development Agreement and Concept Plan, the May River Crossing Master Plan, and the Unified Development Ordinance Sections 5.3 and 5.10. 3. Section 3.10.3.A.3. If the proposed development is associated with a previously approved Master Plan, then the traffic and access plans shall adhere to the previously approved traffic impact analysis or assessment, where applicable. If an application is not associated with a previously approved PUD Master Plan, then a traffic impact analysis shall be required at final development plan submittal. Finding. The traffic and access plan adheres to the previously approved traffic impact analysis. The overall May River Crossing development provides one point of access to May River Road and two points of access to Okatie Highway (SC Highway 170). 4. Section 3.10.3.A.4. The proposed development must be able to be served by adequate public services, including, but not limited to, water, sanitary sewer, Page 9 Section VII. Item #3. November 19, 2025 Page 3 Chipotle at May River Crossing – Preliminary Development Plan Planning Commission roads, police, fire, and school services. For developments that have the potential for significant impact on infrastructure and services, the applicant shall be required to provide an analysis and mitigation of the impact on transportation, utilities, and community services. Finding. The subject parcel is an outparcel within May River Crossing and utilities have been stubbed to serve this site. Finding. Letters from the agencies providing public services will be required at time of Final Development Plan submittal per the Applications Manual. 5. Section 3.10.3.A.5. The phasing plan, if applicable, is logical and is designed in a manner that allows each phase to fully function independently regarding services, utilities, circulation, facilities, and open space, irrespective of the completion of other proposed phases. Finding. The project is proposed to be completed in a single phase. 6. Section 3.10.3.A.6. The application must comply with applicable requirements in the Applications Manual. Finding. The application has been reviewed by Town Staff and has been determined to be complete. PLANNING COMMISSION ACTIONS: The Planning Commission has the authority to take the following actions with respect to the application as authorized by Section 2.2.6.C.5 of the UDO: 1. Approve the application as submitted; 2. Approve the application with conditions; or 3. Deny the application as submitted. RECOMMENDATION: Should the Planning Commission choose to approve the application with conditions, Town Staff finds that the following condition should be met prior to final development plan approval to be in accordance with the requirements of Section 3.10.3.A: 1. The allocation of off-site parking spaces must be provided in a letter of approval from the May River Crossing POA at time of Final Development Plan submittal. ATTACHMENTS: 1. Application and Narrative 2. Vicinity Map 3. May River Crossing Master Plan 4. Revised Site Development Plans 10 31 25 5. DRC Comments 10 8 25 and Original Site Plan 08 22 25 6. DRC Comments 10 22 25 7. Response to DRC Comments 10 23 25 Page 10 Section VII. Item #3. Docusign Envelope ID: 6A186463-5C94-4A02-9A27-8896CC0E534B Docusign Envelope ID: FE04D754-34CE-4E7A-BCE5-D38924099FA6 9/3/2025 ATTACHMENT 1 Page 11 Section VII. Item #3. Page 1 of 4 MAY RIVER CROSSING - CHIPOTLE BLUFFTON, SOUTH CAROLINA PROJECT NARRATIVE J – 26430.2000 October 22, 2025 Project Introduction and Overview This application is for Preliminary Development Plan approval of the Outparcel A-4, now or formerly owned by First Chatham Bank, of the previously approved May River Crossing development, located within the Jones Estate PUD. The Town of Bluffton approved the Concept Plan and a Development Agreement for the Jones Estate PUD in April 2000. The Concept Plan defines the allowed land uses in the various areas of the Jo nes Estate Planned Unit Development Area. The documents also define the development standards, which govern all development activity within the Concept Plan, including May River Crossing. These negotiated land uses and development standards are binding upon the Town and this Applicant. The Concept Plan and Development Agreement set the binding framework for this Application. Development of this portion of May River Crossing is largely governed by the May River Crossing Master Plan as well, which was originally approved in 2016. Since that time, developmental Master Plan compliance has been evaluated based on interpretations by the Town of Bluffton. Specifically, given the adjacency of Parcel A-4 to a park amenity in May River Crossing, it is required that any proposed building on Parcel A -4 must front the park without any on -site drive aisles splitting them to be considered Master Plan compliant. Project Specific Description May River Crossing is continuing development with the development of Outparcel A -4. The project is located within the Jones Estate PUD, and is located at the intersection of May River Crossing Road and Pondberry Road, near the intersection with SC HWY 170. The project area includes parcels R610-036-000-3211-0000. The total area submitted for permitting is +/- 1.12 acres, however the total project limits amount to +/ - 0.71 acres. The project scope consist s of water and sewer laterals, storm drainage infrastructure and an asphalt roadway to serve the proposed commercial Chipotle building. Existing Conditions The property is predominantly cleared, and in some areas filled, per site development plans for May River Crossing Phase 1. Similarly, water, sewer, and drainage utilities , as well as established accesses have been provided to the project site in compliance with the previously approved Master Plan. The building footprint has been sited to be master plan compliant, and paved areas have been laid out to minimize potential impacts to existing significant trees. ATTACHMENT 1 Page 12 Section VII. Item #3. MAY RIVER CROSSING – CHIPOTLE (OUTPARCEL A-4) Page 2 of 4 Soil Conditions Existing soil conditions information was compiled from the Soil Survey of Beaufort Count y South Carolina, USDA Soil Conservation Service. The project area generally contains Seabrook (Sk) and Wando (Wd) fine sands . Hydrologic Soil Groups (HSG) within the project area are generally classified as A. Wetland Verification An Approved Jurisdictional Determination (AJD) was received from the United States Army Corps of Engineers confirming no jurisdictional wetlands exist on the subject site. Topography May River Crossing is situated on a predominantly sandy site with elevations ranging from elevation 36 along the Highway 170 right -of-way to 44 in the southwestern quadrant of the property with the site primarily draining to the east. The project site was previously filled to a crowned finished pad elevation of 38, per site development plans for May River Crossing Phase 1 with the site primarily draining to catch basins located within the roads that bound the site. Parking Standards Parking shall comply with section 5.2.1.1 of the Development Standards Ordinance Modifications dated April 19, 2000 in the Jones Estate Plan Development Concept Plan based on use. Given the commercial use of the project site, this portion of development will comply with 12 spaces per 1,000 square feet of gross floor area. Total Gross Floor Area: 2385 SF Total Parking Stalls Required: 29 ADA Stalls Required per Total Required: 2 Similarly, parking standards will be reviewed in accordance with Publix CORE Outparcel Parking Requirements. Section 4.1.h. i states that each Outparcel should contain no less than 5 spaces per 1,000 square feet of Leasable Floor Area. Total Parking Stalls Required: 12 Per conversations held with Town Staff, and in an effort to minimize potential impacts to the onsite 52 ” Live Oak , we respectfully request allowance to deviate from Section 5.2.1.1 of the UDO by proposing two less parking s talls that what would be typi cally required. This allowance would bring our parking den sity to 11 spaces per 1,000 square feet of gross floor area. Total Parking Stalls Proposed: 27 ADA Stalls Provided: 2 ATTACHMENT 1 Page 13 Section VII. Item #3. MAY RIVER CROSSING – CHIPOTLE (OUTPARCEL A-4) Page 3 of 4 Access & Construction Traffic The property will be accessed from Pondberry Road, which can be accessed from SC HWY 170. Site Design and Development Standards Architectural guidelines are currently governed by the Declaration of Covenants, Conditions and Rest rictions for Towne Centre at New Riverside. The project site also falls within the Highway Corridor Overlay District (HCOD) and shall comply to these standards. The applicant intends to responsibly exercise the design functions entrusted to the applicant as the private developer under the Concept Plan and Development Agreement. Stormwater Management System May River Crossing is situated within the New River watershed, a 303(d) impaired waterbody as classified by the state of South Carolina. The stormwater detention pond on parcel R610 -036-000-0593-0000 is the primary management device for the entire development to intercept and treat runoff prior to discharging to the Great Swamp tributary. Stormwater runoff will be attenuated to pre -development levels for the 2 -, 10-, 25-, 50-, and 100-year, 24-hour rainfall events. At the project site, an underground storm piping system has been stubbed out for use of the commercial development. The preliminary SoLoCo Compliance Calculator, provided with this submittal, takes into account the “Project Limits” (PL) boundary shown on sheet C1.1. The required treatment and retention volume is planned to be met through pervious paver parking spaces, we anticipate HSG A, highly infiltrative soils in this area (>0.5 in./hr.) and therefore do not plan to use underdrains at this time. However, an underdrain may be required should the geotechnical results show unfavorable soil conditions. The geotechnical report for this site will be provided with the stormwater review package. Setbacks All buildings are required to meet Fire & Building Code requirements prior to construction. Ownership and Maintenance of Common Areas Common infrastructure, open space and drainage development in May River Crossing will be maintained in accordance with existing and proposed maintenance agreements between property owners. Utility Service • Power and gas will be provided by Dominion Energy. • Telephone services will be provided by Sparklight. • Fire Protection will be provided by the Bluffton Township Fire District. • Water & Sewer will be owned and operated by BJWSA. ATTACHMENT 1 Page 14 Section VII. Item #3. MAY RIVER CROSSING – CHIPOTLE (OUTPARCEL A-4) Page 4 of 4 Proposed Roadway Section The May River Crossing - Chipotle Pavement Section will consist of the following: • Width = Varies • Section = Pitched • Material = Standard Asphalt Pavement and Pervious Paver Parking Spaces • Right–of–way = N/A • Drainage = Pervious pavers, curb Inlets, and drainage piping ATTACHMENT 1 Page 15 Section VII. Item #3. VICINITY MAP CHIPOTLE AT MAY RIVER CROSSING DEVELOPMENT PLAN ATTACHMENT 2 Page 16 Section VII. Item #3. SCALEI"=100' SEPTEMBER6,2018 BEAUFORTCOUNTY 100050100200400 1 ¢ i i t ¥ I' # I ¥I . ,, // 1/,', , 50'BUFFER T I • I I @ \s;\', t \\ JI f,"y'- Y /e.·."'-.__./•' '-....__ '-.... ,«» /2PARKER'S, M4\t ''" ·-"'-" MayRiverCrossingMasterPlan BLUFFTON,SOUTHCAROLINA I # I #yE /J,';l, 7 ti I t . t I » ' TOWNOFBLUFFTON APPROVED _ ~ TownofBluffton NOV082018 Planning&GrowthMgmt 369 30 30 87 54 154 724 6430.0000 ParkingParking ParkingRatioProvidedProvided 260 18 30 30 AreaSq.Ft. 52,000 3,500 6,060 6,060 5,00025 1,2256 13.1673,8455/1,000sq.ft.369 1.332,50012/1000sg.ft30 1.342,50012/1,000sa.ft30 1.447,25012/1,000sa.ft87 1.524,50012/1,000sa.ft54 3.8244,0003.5/1,000sa.ft154 22.61134,595724 SymbolUse AMajorGroceryAnchor AlRetail/Restaurant A2Retail/Restaurant A3Retail/Restaurant A4Retail/Restaurant A5Retail/Restaurant SUBTOTAL BRestaurant CRestaurant ERestaurant GRestaurant FOffice TOTAL OUTPARCELUSESANDSQUAREFOOTAGEYIELDSASSHOWNAREANESTIMATEATTHISTIME ANDSHALLNOTBELIMITEDTOTHOSESHOWN. REFERTOTHENARRATIVEFORPARKINGREQUIREMENTS REFERTOTHEMAYRIVERCROSSINGGREENSPACEPLANFORSPECIFICSREGARDINGOPEN SPACEANDPERVIOUS/IMPERVIOUSSUMMARIES. LEGEND EXISTINGTREES 60'COMMERCIAL BUFFERr 75'COMMERCIAL SETBACK , as«a;al "I # FUNCTIONALOPEN $±¢SPACE%/ =-75MMERCIAL/?%, gas"=TsErAck 7 ' at-360COMMERCIAL--<., +7S#jg#a±=.a.=BUFFER[ =<--_-_.<$ •ju=cw=.,a!+E. HalvorsenDevelopmentCorporation HUTTON ATTACHMENT 3 Page 17 Section VII. Item #3. REV. NO. REVISION REVISION HISTORY BY DATE SUBMITTED TO SUBMITTAL HISTORY DATE DATE TOWN OF BLUFFTON 8/25/25         TOWN OF BLUFFTON 10/9/25 TOWN OF BLUFFTON 10/22/25                                                                                         J-26430.2000 08/22/25 MAY RIVER CROSSING - CHIPOTLE   Know what'sbelow. before you dig.Call R SITE DEVELOPMENT PLAN OF MAY RIVER CROSSING - CHIPOTLE   MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA PREPARED FOR: ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       AUGUST 22, 2025 LAST REVISED: 10/22/2025 TM# R610-036-000-3211-0000 J-26430.2000 VICINITY MAP SCALE: 1" = 1000' SITE PREPARED BY: 50 Park of Commerce Way Savannah, GA 31405 p.912.234.5300 www.thomasandhutton.com Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-CS.DWG - Oct 30, 2025 - 8:57 AM OKATIE HWY OKATIE HWY NEW RIVERSIDE RD 46 46 170 EVAN WAY MAY RIVER XING MAY RIVER RD SCDHEC # 00000-WW SCDHEC # 00000-WS TOWN OF BLUFFTON STORM WATER PERMIT #SWP- TOWN OF BLUFFTON PERMIT #DP-08-25-019908 SCDHEC OCRM STORMWATER PERMIT #0000000000 BJWSA # VERTICAL DATUM: NAVD 88 I, HEPBLUFF, LLC, CERTIFY THAT THE LAND DISTURBING ACTIVITY WILL BE ACCOMPLISHED ACCORDING TO THE PLAN ACCEPTED BY THE OWN OF BLUFFTON AND SCDHEC. I, HEPBLUFF, LLC, ACKNOWLEDGE AS THE PROPERTY OWNER AND PERSON ULTIMATELY RESPONSIBLE FOR THE LAND DISTURBING ACTIVITY AT THIS SITE AND THE RIGHT OF THE TOWN OF BLUFFTON OR SCDHEC TO CONDUCT ON-SITE INSPECTIONS. I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000. OWNER CERTIFICATION STATEMENT: ENGINEER CERTIFICATION STATEMENT: Sheet List Table Sheet Number Sheet Title C0 COVER SHEET G0.1 GENERAL NOTES & INDEX EX1.1 EXISTING CONDITIONS & DEMO PLAN C1.1 SITE PLAN C1.2 SITE DETAILS 10-30-25 10-30-25 PERMIT SET - FOR REVIEW PURPOSES ONLY ATTACHMENT 3 Page 18 Section VII. Item #3. SC HIGHWAY NO. 170 R/W VARIES SC HIGHWAY 46 R/W VARIES SC HIGHWAY NO. 170 R/W VARIES SC HIGHWAY NO. 46 R/W VARIES NEW RIVERSIDE RD 300 R/W VARIES SC HIGHWAY NO. 170 R/W VARIES EVAN WAY R/W VARIES MAY RIVER XING MAY RIVER XING PONDBERRY ST STARSHINE CIR CVS 75651 SC LLC TMS# R610 036 000 0979 0000 MAY RIV CROSSING INV LLC TMS# R610 036 000 3210 0000 DGK REAL ESTATE MAY RIVER LLC TMS# R610 036 000 3209 0000 N/F FIRST CHATHAM BANK TMS# R610 036 000 3211 0000 JBS REALTY LLC C/O JAMES B SAMA TMS# R610 036 000 0598 0000 FIRST CITY ASSOCIATES LLLP TMS# R610 036 000 0866 0000 MFF ENTERPRISES LLC TMS# R610 036 000 0867 0000 MAYE RIVER BAPTIST CHURCH TMS# R610 036 000 0045 0000 CAROLINA OAKS ASSOCIATION TMS# R614 036 000 3493 0000 IMI LLC TMS# R610 036 000 0593 0000 LOCK LLC TMS# R614 036 000 0604 0000 K HOVNANIANS FOUR SEASONS AT CAROLINA OAKS LLC TMS# R614 028 000 0002 0000 FIRST CHATHAM BANK TMS# R610 036 000 3213 0000 BEAUFORT CNTY MEM HOSP TMS# R610 036 000 3212 0000 PR II MAY RIVER CROSSING LLC TMS# R610 036 000 0386 0000 STARBUCKS PUBLIX SUPERMARKET SC HIGHWAY NO. 46 R/W VARIES COMMERICAL/ RESTAURANT COMMERICAL/ RESTAURANT EX1.1, C1.1 SCALE: 1" = 200' INDEX ABBREVIATIONS DBL DOUBLE FM FORCE MAIN (SANITARY SEWER) OC ON CENTER SS SANITARY SEWER BOT BOTTOM FP FINISH PAD PC POINT OF CURVE TC TOP OF CURB CB CATCH BASIN FPW FIRE PROTECTION PH POST HYDRANT TH THROAT ELEVATION CI CURB INLET FR FRAME PT POINT OF TANGENT TG TOP OF GUTTER CO CLEAN OUT GI GRATE INLET PVC POLYVINYL CHLORIDE TP TOP OF PAVEMENT CPP CORRUGATED PLASTIC PIPE GV GATE VALVE RCP REINFORCED CONCRETE PIPE TW TOP OF WALK DBL DOUBLE HDPE HIGH DENSITY POLYETHYLENE RC ROLL CURB INLET TYP TYPICAL DI DITCH INLET HI HOODED INLET RCP REINFORCED CONCRETE PIPE VI VALLEY INLET DIP DUCTILE IRON PIPE INV INVERT ELEVATION RI ROOF INLET W WATER EL ELEVATION JB JUNCTION BOX RJP RESTRAINED JOINT PIPE W/ WITH ES END SECTION LF LINEAR FEET R/W RIGHT-OF-WAY WV WATER VALVE FES FLARED END SECTION MAX MAXIMUM SD STORM DRAINAGE YI YARD INLET FG FINISH GRADE MIN MINIMUM SDMH STORM DRAINAGE MANHOLE FH FIRE HYDRANT MH MANHOLE SF SQUARE FEET Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-GN-NT.DWG - Oct 30, 2025 - 8:57 AM DESIGNED: SCALE: REVIEWED: APPROVED: DRAWN: JOB NO: DATE: NO. REVISIONS DATE CLIENT/OWNER: PROJECT LOCATION: DATUM:HORIZ.: VERT.: BY GENERAL NOTES & INDEX G0.1 26430.2000   MAY RIVER CROSSING - CHIPOTLE MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA NAD 83 NAVD 88 ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       08/22/25 TTH GSS MSH GSS                                     50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com                                     GRAPHIC SCALE: 1 INCH = 0 200 FEET 200 100 200 XX1.99 SHEET NUMBERING DETAIL SCALE: NOT TO SCALE SHEET\PAGE NUMBER PREFIX PREFIX C0 COVER SHEET G0 GENERAL NOTES/ LEGENDS G1 GENERAL INFORMATION PLAN EX1 EXISTING CONDITIONS & DEMOLITION C1 SITE LAYOUT - PLAN/PROFILES/DETAILS C2 WATER & SEWER - PLAN/PROFILES/DETAILS C3 PAVING & DRAINAGE C4 GRADING - PLAN/PROFILES/DETAILS EC0 EROSION CONTROL - NOTES/LEGENDS EC1 EROSION CONTROL PHASE 1 - PLAN EC2 EROSION CONTROL PHASE 2 - PLAN EC3 EROSION CONTROL PHASE 3 - PLAN EC4 EROSION CONTROL DETAILS L1 LANDSCAPE - PLAN/DETAILS M MECHANICAL/HVAC A ARCHITECTURAL P PLUMBING E ELECTRICAL V SURVEY/MAPPING PLAN/PROFILE/DETAILS PLAN/PROFILE/DETAILS SPOT ELEVATION LEGEND TOP OF CURB TOP OF WALK BOTTOM OF WALL TOP OF WALL FINISHED GRADE TOP OF PAVEMENT 16.90FG16.90FG 16.9016.90TP 16.9016.90TC 16.9016.90TW 16.9016.90WT 16.9016.90WB TP TC TW WT WB DESCRIPTION PROPOSED EXISTING DRAINAGE LEGEND DESCRIPTION EXISTING PROPOSED PIPE DITCH CURB INLET (CI) CATCH BASIN (CB) CURB INLET - RIGHT (CI) OR CATCH BASIN - RIGHT (CB) OR OR CURB INLET - LEFT (CI) OR CATCH BASIN - LEFT (CB) OR OR CURB INLET - BOTH (CI) OR CATCH BASIN - LEFT (CB) OR OR CONTROL STRUCTURE (CS) DITCH INLET (DI) GRATE INLET (GI) HOODED INLET (HI) OR OR JUNCTION BOX (JB) MANHOLE (SDMH) ROLL CURB INLET (RC) ROOF INLET (RI) YARD INLET (YI) FLARED END SECTION (FES) DRAINAGE LEGEND DESCRIPTION EXISTING PROPOSED PIPE DITCH CURB INLET GRATE INLET JUNCTION BOX OUTLET STRUCTURE WATER LEGEND DESCRIPTION EXISTING PROPOSED WATER MAIN SINGLE SERVICE LATERAL DOUBLE SERVICE LATERAL VALVE AND BOX FIRE HYDRANT W/VALVE & BOX POST HYDRANT REDUCER BACKFLOW PREVENTOR CROSS TEE 90° BEND - HORIZONTAL 45° BEND - HORIZONTAL 22-12° BEND - HORIZONTAL 11-14° BEND - HORIZONTAL BEND - VERTICAL CAP 10"W 10"W OTHER UTILITIES LEGEND DESCRIPTION EXISTING NATURAL GAS TELEPHONE UNDERGROUND TELEPHONE ELECTRICITY UNDERGROUND ELECTRICITY UGG OHT UTL OHP UGP 1. CONTRACTOR SHALL VERIFY LOCATION & DEPTH OF ALL UTILITIES PRIOR TO BEGINNING WORK & NOTIFY ENGINEER OF ANY DISCREPANCIES. 2. THE CONTRACTOR SHALL USE EXTREME CARE NOT TO DAMAGE EXISTING TREES WHICH ARE TO REMAIN. 3. ALL STORM DRAIN PIPE JOINTS SHALL BE WRAPPED WITH FILTER FABRIC. 4. CONTRACTOR SHALL LIMIT CLEARING ACTIVITIES & TREE REMOVAL TO AREAS INDICATED ON PLAN. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AREA CLEARED OUTSIDE THE LIMITS AND ANY DAMAGE TO REMAINING TREES. 5. ALL VERTICAL ELEVATIONS REFER TO NAVD 88 DATUM. 6. ALL HORIZONTAL GEOMETRIES REFER TO NAD83 DATUM. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDERGROUND UTILITIES AND SHALL COORDINATE ALL WORK WITH THE OWNER AND UTILITY COMPANIES. 8. THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANY WAY INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT BIND THOMAS & HUTTON. 9. ALL EXCAVATION AND BACKFILLING SHALL BE PERFORMED IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. 10. ALL PROPOSED ELEVATIONS SHOWN ARE TOP OF PAVEMENT OR FINAL DIRT GRADE (INCLUDING TOPSOIL) IN GRASSED AREAS UNLESS OTHERWISE INDICATED. 11. CALL BEFORE YOU DIG: 1-800-282-7411. FOR COUNTY WATER AND SANITARY SEWER LINE LOCATIONS, CONTACT THE UTILITIES PROTECTION CENTER (1-800-282-7411) A MINIMUM OF SEVENTY-TWO (72) HOURS PRIOR TO DIGGING. 12. GRASSED AND LANDSCAPE AREAS SHALL BE GRADED AS NECESSARY TO PROVIDE POSITIVE DRAINAGE. ALL PRECAUTIONS SHALL BE TAKEN TO PROTECT TREES RETAINED. PROVIDE 4" MIN. TOPSOIL IN ALL LANDSCAPE AREAS. 13. WATER MAINS SHALL BE LAID AT LEAST 10 FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED SANITARY SEWER, STORM SEWER, OR SEWER MANHOLE. THE DISTANCE SHALL BE MEASURED EDGE-TO-EDGE. A MINIMUM 18 INCHES VERTICAL SEPARATION MUST BE MAINTAINED. 14. WHEN CONDITIONS PREVENT A HORIZONTAL SEPARATION OF 10 FEET, THE WATER MAIN MAY BE LAID CLOSER TO A SEWER (ON A CASE-BY-CASE BASIS) PROVIDED THE WATER MAIN IS LAID IN A SEPARATE TRENCH OR ON A UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SEWER AT SUCH AN ELEVATION WHERE THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER. IT IS ADVISED THE SEWER BE CONSTRUCTED OF MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS OF CONSTRUCTION AND BE PRESSURE TESTED TO ASSURE WATER-TIGHTNESS PRIOR TO BACKFILLING. 15. THE MINIMUM DEPTH OF COVER OVER WATER LINES SHALL NOT BE LESS THAN 36" IN ANY CASE. WHERE IT IS IMPOSSIBLE TO MAINTAIN 36" COVER AND 18" MINIMUM SEPARATION, THE 36" COVER WILL BE MAINTAINED AND BOTH WATER AND SEWER LINES WILL BE CONSTRUCTED OF ONE SECTION EACH OF DUCTILE IRON PIPE. THE PIPES SHALL BE SUPPORTED AND CENTERED AT THE CROSSING WITH MECHANICAL JOINTS ON EACH LINE AT BOTH SIDES OF THE CROSSING. 16. THE REQUIRED MINIMUM 3 FT. OF COVER SHALL BE MAINTAINED ON THE EXISTING DOMESTIC AND FIRE SERVICE LINES.  EXTREME CARE SHALL BE TAKEN TO AVOID DAMAGE TO EXISTING WATER VALVES AND HYDRANTS. AT NO TIME SHALL FLOW TO DOMESTIC WATER AND FIRE PROTECTION SUPPLY LINES BE DISRUPTED. 17. PIPE, FITTINGS, VALVES AND OTHER ACCESSORIES SHALL, UNLESS OTHERWISE DIRECTED, BE UNLOADED AT THE POINT OF DELIVERY, AND STORED WHERE THEY WILL BE PROTECTED AND WILL NOT BE HAZARDOUS TO TRAFFIC. THEY SHALL AT ALL TIMES BE HANDLED WITH CARE TO AVOID DAMAGE. THE INTERIOR OF ALL PIPE, FITTINGS AND OTHER ACCESSORIES SHALL BE KEPT FREE FROM DIRT AND FOREIGN MATTER AT ALL TIMES. 18. ANY DEFECTIVE, DAMAGED, OR UNSOUND PIPE SHALL BE REJECTED. ALL FOREIGN MATTER OR DIRT SHALL BE REMOVED FROM THE INSIDE OF THE PIPE BEFORE IT IS LOWERED INTO ITS POSITION IN THE TRENCH AND SHALL BE KEPT CLEAN BY ACCEPTABLE MEANS DURING AND AFTER LAYING. CARE SHALL BE TAKEN TO PREVENT DIRT FROM ENTERING THE JOINT SPACE. AT TIMES WHEN PIPE LAYING IS NOT IN PROGRESS, THE OPEN ENDS OF THE PIPE SHALL BE CLOSED BY ACCEPTABLE MEANS AND NO TRENCH WATER SHALL BE PERMITTED TO ENTER THE PIPE. 19. CLEAN THE INTERIORS OF ALL PIPE BY BRUSHING, SWABBING OR WASHING OUT OF ALL DIRT BEFORE LAYING. 20. FLUSH THE NEW WATER, SEWER, AND NON-POTABLE PIPE LINES UNTIL THE WATER RUNS CLEAR AT THE END OF ALL MAINS AND LATERALS. THIS SHOULD BE COMPLETED AFTER THE PRESSURE TEST AND BEFORE DISINFECTION. A MINIMUM FLUSHING VELOCITY OF 2.5 ft/sec MUST BE ACHIEVED TO PURGE ALL FOREIGN MATERIAL FROM ALL PROPOSED MAINS. 21. ALL JURISDICTIONAL WETLANDS ARE SUBJECT TO FEDERAL PROSECUTION BY THE ARMY CORPS OF ENGINEERS FOR WETLAND VIOLATIONS. 22. THERE ARE NO PROPOSED JURISDICTIONAL WETLAND IMPACTS AS PART OF THIS PROJECT. 23. CONTRACTOR IS RESPONSIBLE FOR CONNECTING BUILDING ROOF LEADS, WATER CONNECTIONS, AND SANITARY CONNECTIONS. ALL LOCATIONS AND ELEVATIONS TO BE VERIFIED WITH BUILDING ARCHITECTURAL, PLUMBING AND FIRE PROTECTION PLANS. CONTRACTOR REQUIRED TO COORDINATE ALL BUILDING LEAD LOCATIONS AND ELEVATIONS WITH BUILDING CONTRACTOR PRIOR TO INSTALLATION. 24. REFERENCE SURVEYS: THOMAS & HUTTON 25. ALL WATER USED FOR CONSTRUCTION SHALL BE METERED THROUGH AN ACCEPTABLE BACKFLOW PREVENTION DEVICE AND FIRE HYDRANT METER OBTAINED FROM EFFINGHAM COUNTY. 26. AN ACCEPTABLE WATER SUPPLY FOR FIRE PROTECTION, EITHER TEMPORARY OR PERMANENT, SHALL BE MADE AVAILABLE AS SOON AS COMBUSTIBLE MATERIAL ARRIVES ON THE SITE. 27. ALL MATERIALS USED AND COME INTO CONTACT WITH DRINKING WATER DURING ITS DISTRIBUTION SHALL NOT ADVERSELY AFFECT DRINKING WATER QUALITY AND PUBLIC HEALTH AND MUST BE CERTIFIED FOR CONFORMANCE WITH AMERICAN NATIONAL STANDARDS INSTITUTE/NATIONAL SANITATION FOUNDATION STANDARD 61 (ANSI/NSF STANDARD 61). 28. IN ALL WATER LINE PROJECTS, CARE WILL BE TAKEN TO KEEP THE INTERIOR OF THE WATER PIPE CLEAN PRIOR TO CONNECTION TO THE COUNTY SYSTEM. THIS WILL BE ACCOMPLISHED BY STRICT ADHERENCE TO BEAUFORT COUNTY SPECIFICATIONS. 29. CONTRACTOR SHALL COORDINATE TIE-IN OF NEW WATER AND SEWER FACILITIES WITH BJWSA. 30. CONTRACTOR RESPONSIBLE FOR PROVIDING ENGINEER AS-BUILT SURVEY IN AUTOCAD FORMAT. AS-BUILT SURVEY TO INCLUDE TWO COPIES OF SURVEY AND BE SIGNED BY REGISTERED LAND SURVEYOR IN THE STATE OF SOUTH CAROLINA. 31. GROUNDWATER RECHARGE - PERMANENT STORMWATER INFILTRATION BASINS SHALL NOT BE CONSTRUCTED IN SIGNIFICANT RECHARGE AREAS HAVING HIGH POLLUTION AND SUSCEPTIBILITY. GENERAL NOTES GENERAL PROJECT/SITE INFORMATION ENGINEER TELEPHONE: (912) 234-5300 COMPANY/DEPT.: THOMAS & HUTTON NAME/TITLE: GRIFFIN SAVEDGE, P.E. ADDRESS: 50 PARK OF COMMERCE WAY, SAVANNAH, GA 31405 GEOTECHNICAL ENGINEER TOPOGRAPHIC AND BOUNDARY SURVEYOR COMPANY/DEPT.: THOMAS & HUTTON ADDRESS: 50 PARK OF COMMERCE WAY, SAVANNAH, GA 31405 TELEPHONE: (912) 234-5300 ARCHITECT COMPANY/DEPT.: TBD ADDRESS: TBD TELEPHONE: TBD TELEPHONE: (952) 941-8660 COMPANY/DEPT.: WILKUS ARCHITECTS ADDRESS: 15 NINTH AVE N, HOPKINS, MN 55343 PROPERTY OWNER ADDRESS: 111 BARNARD STREET, SAVANNAH, GA 31401 COMPANY/DEPT.: N/F FIRST CHATHAM BANK TELEPHONE: (912) 629-2936 NAME/TITLE: TBD SANITARY & WATER SERVICE: TELEPHONE: (843) 987-9250 COMPANY/DEPT.: BEUFORT JASPER WATER & SEWER AUTHORITY ADDRESS: 6 SNAKE ROAD, OKATIE, SC 29909 BEAUFORT COUNTYCOUNTY: ZONING: PUD TOWN OF BLUFFTONMUNICIPALITY: COMMUNICATION SERVICE: TELEPHONE: (912) 291-8341 COMPANY/DEPT.: SPARKLIGHT ADDRESS: 925 FORDING ISLAND RD, BLUFFTON, SC 29928 ELECTRIC & NATURAL GAS SERVICE: TELEPHONE: (843) 816-2907 COMPANY/DEPT.: DOMINION ENERGY ADDRESS: 81 MAY RIVER ROAD, BLUFFTON, SC 29910 DEVELOPER ADDRESS: 1315 WHITTAKER DRIVE, COLUMBIA, SC 29206 NAME/TITLE: TAYLOR WOLFE COMPANY/DEPT.: ONPOINT PARTNERS, LLC TELEPHONE: (803) 261-8776 STORMWATER MANAGEMENT (TOWN): TELEPHONE: (843) 706-4500 COMPANY/DEPT.: TOWN OF BLUFFTON ADDRESS: 1261 MAY RIVER ROAD, BLUFFTON, SC 29910 STORMWATER MANAGEMENT (STATE): TELEPHONE: (843) 953-5324 COMPANY/DEPT.: SCDHEC-OCRM ADDRESS: 13662 MCMILLIAN AVE. SUITE 400, CHARLESTON, SC 29405 BUILDING DEPARTMENT COMPANY/DEPT.: TOWN OF BLUFFTON/BUILDING OFFICIAL ADDRESS: 20 BRIDGE STREET, BLUFFTON, SC 29910 TELEPHONE: (843) 706-7810 FIRE DEPARTMENT: COMPANY/DEPT.: BLUFFTON FIRE DISTRICT ADDRESS: 357 FORDING ISLAND ROAD, BLUFFTON, SC 29910 TELEPHONE: (843) 757-2800 NAME/TITLE: DAN WILTSE NAME/TITLE: ROB CURRALL NAME/TITLE: MATTHEW MICHAELS NAME/TITLE: TRACY TRIMMER NAME/TITLE: DE KELLY PITTINGER NAME/TITLE: ANDREA MORENO COMPANY/DEPT.: PAMELA WINKLER 10-30-25 10-30-25 PERMIT SET - FOR REVIEW PURPOSES ONLY ATTACHMENT 3 Page 19 Section VII. Item #3. LO S52 PONDBERRY ROAD 38 38 35 35 35 35 35 35 35 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 37 37 37 37 37 3737 37 37 37 37 37 37 37 3737 37 37 373737 37 37 37 37 37 37 37 37 37 37 37 37 37 38 38 3838 38 38 38 38 38 38 38 38 38 3838 38 37 37 37 38 38 MAY RIVER CROSSING ROAD MAY RIVER CROSSING ROAD ±273 S.F. OF CURB & GUTTER TO BE DEMO AND REMOVED N: 149,238.07 E: 2,006,325.68 N: 149,412.60 E: 2,006,377.58 N/F FIRST CHATHAM BANK R610 036 000 3211 0000 N/F REAL SUB, LLC R610 036 000 0386 0000 LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLOD LODLODLODLOD LODLODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LIMITS OF DISTURBANCE 10" 45° BEND 10" PVC - C900 - DR 18 10" X 6" TEE 6" GV (P24) FH ASSEMBLY (BL4121/6)10" 45° BEND ±176 LF 8" PVC- SDR 26 @ 0.39% MH #08 FR: 37.44 INV.: 32.11 MH #18 FR: 36.09 INV.: 32.32 ±25 LF 8" PVC- SDR 26 @ 0.85% ±18 LF 10" DIP CENTERED ON CROSSINGS (0.5' SEPARATION WATER OVER SEWER) ±36 LF 10" DIP EXISTING 5' WIDE SIDEWALK EXISTING OFF SITE PARKINGEXISTING OFF SITE PARKING STOP BAR (TYP) PROPERTY LINE TRANSFORMER STOP SIGN (TYP) HI #49 FR: 36.80 INV.: 31.90 HI #51 FR: 37.00 INV.: 31.90 15" PVC - SDR 26 ±54 LF 18" RCP @ 0.27% SMH #37 FR: 37.44 INV. IN: 30.53 (NE) INV. IN: 31.70 (E) INV. OUT: 28.78 (SW) GI #20 FR: 37.50 INV. IN: 29.17 (N) INV. IN: 30.61 (W) INV. OUT: 29.17 (S) ±48 LF 24" RCP @ 1.95% ±24 LF 18" RCP @ 0.33% INV.: 30.18 ±145 LF 24" RCP @ 0.33% GI #63 FR: 36.60 INV. IN: 30.71 (E) INV. IN: 30.58 (W) INV. OUT: 30.58 (S) ±24 LF 18" RCP @ 0.16% INV.: 30.67 CI #8 FR: 35.53 INV.: 30.86 ±28 LF 18" RCP @ 0.32% CI #6 FR: 35.53 INV.: 30.33 ±28 LF 18" RCP @ 0.29% GI #50 FR: 37.46 INV. IN: 30.10 (N) INV. IN: 30.10 (E) INV. IN: 30.11 (W) INV. OUT: 30.10 (S) 1" = 10' Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-EX-PL.DWG - Oct 30, 2025 - 8:57 AM DESIGNED: SCALE: REVIEWED: APPROVED: DRAWN: JOB NO: DATE: NO. REVISIONS DATE CLIENT/OWNER: PROJECT LOCATION: DATUM:HORIZ.: VERT.: BY EXISTING CONDITIONS & DEMO PLAN EX1.1 26430.2000   MAY RIVER CROSSING - CHIPOTLE MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA NAD 83 NAVD 88 ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       08/22/25 TTH GSS MSH GSS                                     50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com                                     GRAPHIC SCALE: 1 INCH = 0 10 FEET 10 5 10 10-30-25 10-30-25 PERMIT SET - FOR REVIEW PURPOSES ONLY ATTACHMENT 3 Page 20 Section VII. Item #3. LO S52 PONDBERRY ROAD MAY RIVER CROSSING ROAD DETECTABLE WARNING (TYP)14' 4' PROPOSED BUILDING ±2385 S.F. 5'R 3'R 60° 18' 33' 18' EXISTING - OFFSITE PARKING - 7 SPACES EXISTING - OFFSITE PARKING - 8 SPACES DUMPSTER LOCATION 20' X 14' 12'R PARK 3'R 3'R 3'R 20'R 3'R 18' 45' - 5 PERVIOUS PAVER PARKING SP @ 9' X 18' MAY RIVER CROSSING ROAD 12'R PL PLPL PLPL PL PL PLPLPL PL PL PLPLPLPL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL 24" STOP BAR (TYP) 5' WIDE SIDEWALK 18" CATCH CURB & GUTTER 10' PICKUP WINDOW LANE 6' CONCRETE WHEEL STOP (TYP) STRAIGHT ARROW PAVEMENT MARKING COMMERCIAL WATER LATERAL 5' CONCRETE SIDEWALK TYPE A CURB INLET (TYP) GRATE INLET (TYP) METER BOX PROJECT LIMITS 13' 4' 29' 5' 5' GRATE INLET (TYP) (3) 6" WEEP HOLES DRILLED IN WALL EXTENSION FOR DRAINAGE RELIEF CURB INLET (TYP) 60° 7 PERVIOUS PAVER PARKING STALLS (9' X 18') 2 ADA PERVIOUS PAVER PARKING STALLS WITH ACCESS STALL (9' X 18') PERVIOUS PAVER PEDESTRIAN CROSSWALK 4' SPLITTER ISLAND WITH MOUNTABLE CURB 20' 18'10' 6 60° PERVIOUS PAVER PARKING STALLS (11' X 21') 21' 7 60° PERVIOUS PAVER PARKING STALLS (11' X 21') 21' COMMERCIAL SEWER LATERAL COMMERCIAL WATER LATERAL CONNECT TO EXISTING STORMWATER SYSTEM WITH STORM MANHOLE (TYP) PRIVACY FENCING WITH GATE 20' FACADE WALL EXTENSION USED AS DUMPSTER ENCLOSURE 3'R CLEAN OUT (TYP) 3'R 20'R 20' 18" CATCH CURB & GUTTER 5.5' 5' 8'5.5' 1" = 10' Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-ST-PL.DWG - Oct 30, 2025 - 8:58 AM DESIGNED: SCALE: REVIEWED: APPROVED: DRAWN: JOB NO: DATE: NO. REVISIONS DATE CLIENT/OWNER: PROJECT LOCATION: DATUM:HORIZ.: VERT.: BY SITE PLAN C1.1 26430.2000   MAY RIVER CROSSING - CHIPOTLE MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA NAD 83 NAVD 88 ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       08/22/25 TTH GSS MSH GSS                                     50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com                                     GRAPHIC SCALE: 1 INCH = 0 10 FEET 10 5 10 10-30-25 10-30-25 PERMIT SET - FOR REVIEW PURPOSES ONLY ATTACHMENT 3 Page 21 Section VII. Item #3. PAVEMENT ARROW DETAIL NOT TO SCALE 6'-0" 3'-2" 4'-6" 5'-0" 9'-6" 11" 2'-6" 8'-0" 1'-0" 2'-10" 2'-6" 2'-2" 2'-3"R 3'-4"R 1'-11" 2'-3" 2'-6" 2'-3" 5'-0" 6'-6" 11'-6" 11" 2'-3" 6'-0" 2'-6" 2'-10" 2'-3" 3'-6" 1'-0" 3'-2" 5'-6" 3'-4"R 2'-3"R 1'-11" 2'-6" 2'-2" 8'-0" 7'-11" 4" (TYP.) CONCRETE WHEEL STOP DETAIL NOT TO SCALE 11" 6'-0" 5" 3'-4" 12"4" 12" 4" 6" 6" 6" 11" 3"4" 4" 5" NO.4 REBAR NO.4 REBAR EMBED IN PAVEMENT 6" 24" 18" 30" 30" 30" 24" 30" 30" 30" 7'-0" 2'-6" 3'-0" 2'-6" R5-1 W1-1R W1-1L 30" 36" R4-4 R1-1 R1-2 W1-10L R6-2R 30" 30" R2-1 ROAD SIGN DETAILS NOT TO SCALE POST - GALVANIZED U CHANNEL WEIGHT = 2 LBS/FOOT DETECTABLE WARNING DETAIL NOT TO SCALE NOTE: 1. DETECTABLE WARNING SHALL CONSIST OF RAISED TRUNCATED DOMES WITH A DIAMETER OF NOMINAL 0.9 INCHES, A HEIGHT OF NOMINAL 0.2 INCHES AND A CENTER TO CENTER SPACING OF NOMINAL 2.35 INCHES AND SHALL CONTRAST VISUALLY WITH ADJOINING SURFACES. IF THE SIDEWALK AND RAMP ARE CONSTRUCTED OF CONCRETE, THE WARNING AREA SHALL BE RED BRICK IN COLOR. IF THE SIDEWALK AND RAMP ARE CONSTRUCTED OF RED BRICK, THE WARNING AREA SHALL BE GRAY IN COLOR. THE COLOR USED TO PROVIDE CONTRAST SHALL BE AN INTEGRAL PART OF THE WALKING SURFACE. 2. BRICK PAVERS SHALL BE SET IN A WET MORTAR BED ON A 4" MIN. THICK CONCRETE FOUNDATION. CROSSWALK STRIPING DETAIL 8" BOTTOM 8" SOLID 8" SOLID 8" GAP, TYP. 6' TYP. NOT TO SCALE 8' LENGTH VARIES (O.C.) WHITE WHITE BAR 1'-8" 1'-8" 1'-8" 1'-8" 5 1/2" 5 1/2" 10" STOP BAR 4' TYP. 8'-5" 1'-6" 2'-0"8'-0" VARIES, SEE SITE PLAN WHITE REFLECTIVE NOT TO SCALE TYPICAL PAVEMENT MARKINGS TRAFFIC PAINT NOTE: ALL TRAFFIC MARKINGS TO BE SOLID WHITE REFLECTIVE TRAFFIC PAINT AS PER DIMENSIONS ABOVE ACCESSIBLE PARKING SPACE STRIPING DETAIL EDGE OF PAVEMENT OR FACE OF CURB 6' WHEEL STOP (IF REQUIRED) VARIES - SEE PLANS 24" 4" PAINTED BLUE STRIPE (TYP.) 4" PAINTED WHITE STRIPE (TYP.) 45° 108" MIN. 108" MIN. 15' 4.5'4.5' 24" INTERNATIONAL BLUE SYMBOL 3' ALIGN DETECTABLE WARNING WITH CENTERLINE OF LANDING AREA AND BACK OF CURB LINE. DETECTABLE WARNING SHALL EXTEND FULL WIDTH OF CURB RAMP. NOTES: 1. STRIPING AND CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND SPECIFICATIONS. 2. 2% MAXIMUM SLOPE IN ALL DIRECTIONS WITHIN ACCESSIBLE PARKING SPACE AND ACCESS AISLE. 3. ONE IN EVERY 8 ACCESSIBLE SPACES SHALL BE SERVED BY AN 8' WIDE ACCESS AISLE AND SHALL BE DESIGNATED "VAN ACCESSIBLE". 24" 1:50 (2%) SLOPE MAX NOT TO SCALE 60" MIN. FOR STANDARD ACCESSIBLE SPACE OR 108" MIN FOR VAN ACCESSIBLE SPACE (SEE PLAN FOR LOCATION) ACCESSIBLE PARKING SIGN DETAIL 1'-6" 7' MIN 2'-0" 1'-0" x 1'-0" x .080" STANDARD ALUMINUM ACCESSIBLE PARKING SIGN WITH IDENTIFICATION SYMBOL ADDITIONAL SIGN WHERE APPLICABLE 18" 12" 1" TYP. FINISHED GRADE NOTE: SIGNAGE SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND SPECIFICATIONS NOT TO SCALE 4X4 WOOD POST WITH WOOD BACKER TO METAL SIGN NOT TO SCALE STOP SIGN BACKROUND - RED REFLECTORIZED PAINT LEGEND - WHITE REFLECTORIZED PAINT COLORS 5/8" 10"10" 4" 24" 8" 8" 8" 24" PLAN 5'5' SLOPE FACE OF WALL CURB 4" THICK CONCRETE SIDEWALK 5'MIN. 1:12 MAX 5' MIN. MIN. MIN.FLUSH FLARED SIDE (TYP.) MAX SLOPE 1:10 6' MIN. NOTE TO DESIGNER: THIS DETAIL ONLY TO BE USED WHEN SIDEWALK IS MINIMUM 15' BEHIND CURB. DETECTABLE WARNING CURB & GUTTER NOTES: 1. CONSTRUCTION OF ACCESSIBLE CURB RAMP SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND ORDINANCES. 2. TRANSITIONS FROM RAMPS TO WALKS, GUTTERS, OR STREETS SHALL BE FLUSH AND FREE OF ABRUPT CHANGES. MAXIMUM SLOPES OF ADJOINING GUTTERS, ROAD SURFACE IMMEDIATELY ADJACENT TO THE CURB RAMP, OR ACCESSIBLE ROUTE SHALL NOT EXCEED 1:20 (5%) 3. CURB RAMP SHALL HAVE A DETECTABLE WARNING THAT EXTENDS THE FULL WIDTH OF CURB RAMP. SEE DETECTABLE WARNING DETAIL. CURB RAMP "TYPE A" NOT TO SCALE 8" PARKING" SYMBOL PAVEMENT "RESERVED 3" 1'-8" R 1'-0" 8" 1'-6" 5° 2'-0" R 1'-0" 67° 1'-0" 6" R 2'-0" TRAFFIC STRIPING 4" ROYAL BLUE 4" PARKING SPACE CENTERLINE OF NOT TO SCALE 18" ROLL-OVER CURB & GUTTER 6" 10" 18" 10"R SLOPE 3/8"/FT. 18" 6" SLOPE 1"/FT. 10" 8"8"10" PITCH CURB NORMAL CURB 10"R 10" NOTES: 1. ALL CONCRETE SHALL BE 3,000 PSI. 2. PROVIDE CONTROL JOINTS EVERY TEN FEET (10'). 3. PROVIDE EXPANSION JOINTS EVERY FIFTY FEET (50). 4. PROVIDE EXPANSION JOINT WHERE CURB ABUTS SIDEWALKS, OR OTHER STRUCTURES. 5. PROVIDE LIGHT BROOM FINISH. 1" = 1' Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-ST-DT.DWG - Oct 30, 2025 - 8:58 AM DESIGNED: SCALE: REVIEWED: APPROVED: DRAWN: JOB NO: DATE: NO. REVISIONS DATE CLIENT/OWNER: PROJECT LOCATION: DATUM:HORIZ.: VERT.: BY SITE DETAILS C1.2 26430.2000   MAY RIVER CROSSING - CHIPOTLE MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA NAD 83 NAVD 88 ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       08/22/25 TTH GSS MSH GSS                                     50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com                                     GRAPHIC SCALE: 1 INCH = 0 1 FEET 1 .5 1 10-30-25 10-30-25 PERMIT SET - FOR REVIEW PURPOSES ONLY ATTACHMENT 3 Page 22 Section VII. Item #3. Larry C. Toomer Fred Hamilton Mayor Bridgette Frazier Dan Wood Emily Burden Mayor Pro Tempore Council Members Stephen Steese Marcia Hunter Town Manager Town Clerk Theodore D. Washington Municipal Building 20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910 Telephone (843) 706-4500 Fax (843) 757-6720 www.townofbluffton.sc.gov October 8, 2025 Development Review Committee Comments DP-08-25-019908 Chipotle at May River Crossing (Development Plan): A request by OnPoint Partners, LLC on behalf of First Chatham Bank, for approval of a Preliminary Development Plan application. The project consists of the construction of a single-story 2,385 SF restaurant with associated infrastructure. The property is within the Jones Estate Planned Unit Development (PUD) consists of 0.75 acres identified by tax map number R610 036 000 3211 0000 within the May River Crossing Master Plan at the intersection of May River Crossing Road and Pondberry Road. (DP-08-25-019908) (Staff - Dan Frazier) Watershed Management – Revisions Required 1. Post Development Land Cover Totals must match (or be very similar to) Contributing Drainage Area Totals in the Compliance Calculator. Revise. Planning Review – Revisions Required 1. The site plan does not meet the design requirements of the approved May River Crossing Master Plan. Resubmit the site plan to conform to the approved master plan or request to amend the master plan. 2. To conform to the master plan, the building must move eastward to front on the park amenity. A drive through lane cannot wrap around the building and route between the restaurant building and the park amenity. These comments were provided at the pre-application meeting and not addressed with the current application. 3. A preliminary development plan resubmittal is required to address non-conformance with the approved master plan. The revised application will return to the Development Review Committee for review and comment. 4. An approval letter from the applicable POA/ARB is required prior to development plan approval. 5. The subject parcel is within the Highway Corridor Overlay District (HCOD) and will require a Certificate of Appropriateness – Highway Corridor Overlay District (COFA-HCOD) reviewing landscaping, lighting, and architecture at time of final development plan approval. Building Safety Review – Approved Planning Review Addressing – Approved with Conditions 1. If applicable, contact Ryan Coleman, Town of Bluffton GIS Manager (843-706-4570 / rcoleman@townofbluffton.com) to request addressing. Planning Commission Review – Approved with Conditions ATTACHMENT 5 Page 23 Section VII. Item #3. Theodore D. Washington Municipal Building 20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910 Telephone (843) 706-4500 Fax (843) 757-6720 www.townofbluffton.sc.gov 1. Planning Commission comments may be provided at time of Development Review Committee meeting. Transportation Department Review – Approved Police Department Review - Approved BJWSA – Approved Fire Department Review – Approved ATTACHMENT 5 Page 24 Section VII. Item #3. J-26430.2000 08/22/25 MAY RIVER CROSSING - CHIPOTLE   Know what'sbelow. before you dig.Call R SITE DEVELOPMENT PLAN OF MAY RIVER CROSSING - CHIPOTLE   MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA PREPARED FOR: ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       AUGUST 22, 2025   TM# R610-036-000-3211-0000 J-26430.2000 VICINITY MAP SCALE: 1" = 1000' SITE PREPARED BY: 50 Park of Commerce Way Savannah, GA 31405 p.912.234.5300 www.thomasandhutton.com Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-CS.DWG - Aug 21, 2025 - 2:20 PM OKATIE HWY OKATIE HWY NEW RIVERSIDE RD 46 46 170 EVAN WAY MAY RIVER XING MAY RIVER RD SCDHEC # 00000-WW SCDHEC # 00000-WS TOWN OF BLUFFTON STORM WATER PERMIT #SWP- TOWN OF BLUFFTON PERMIT #DP-00-00-000000 SCDHEC OCRM STORMWATER PERMIT #0000000000 BJWSA # VERTICAL DATUM: NAVD 88 I, HEPBLUFF, LLC, CERTIFY THAT THE LAND DISTURBING ACTIVITY WILL BE ACCOMPLISHED ACCORDING TO THE PLAN ACCEPTED BY THE OWN OF BLUFFTON AND SCDHEC. I, HEPBLUFF, LLC, ACKNOWLEDGE AS THE PROPERTY OWNER AND PERSON ULTIMATELY RESPONSIBLE FOR THE LAND DISTURBING ACTIVITY AT THIS SITE AND THE RIGHT OF THE TOWN OF BLUFFTON OR SCDHEC TO CONDUCT ON-SITE INSPECTIONS. I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000. OWNER CERTIFICATION STATEMENT: ENGINEER CERTIFICATION STATEMENT: Sheet List Table Sheet Number Sheet Title C0 COVER SHEET G0.1 GENERAL NOTES & INDEX EX1.1 EXISTING CONDITIONS & DEMO PLAN C1.1 SITE PLAN C1.2 SITE DETAILS ATTACHMENT 5 Page 25 Section VII. Item #3. SC HIGHWAY NO. 170 R/W VARIES SC HIGHWAY 46 R/W VARIES SC HIGHWAY NO. 170 R/W VARIES SC HIGHWAY NO. 46 R/W VARIES NEW RIVERSIDE RD 300 R/W VARIES SC HIGHWAY NO. 170 R/W VARIES EVAN WAY R/W VARIES MAY RIVER XING MAY RIVER XING PONDBERRY ST STARSHINE CIR CVS 75651 SC LLC TMS# R610 036 000 0979 0000 MAY RIV CROSSING INV LLC TMS# R610 036 000 3210 0000 DGK REAL ESTATE MAY RIVER LLC TMS# R610 036 000 3209 0000 N/F FIRST CHATHAM BANK TMS# R610 036 000 3211 0000 JBS REALTY LLC C/O JAMES B SAMA TMS# R610 036 000 0598 0000 FIRST CITY ASSOCIATES LLLP TMS# R610 036 000 0866 0000 MFF ENTERPRISES LLC TMS# R610 036 000 0867 0000 MAYE RIVER BAPTIST CHURCH TMS# R610 036 000 0045 0000 CAROLINA OAKS ASSOCIATION TMS# R614 036 000 3493 0000 IMI LLC TMS# R610 036 000 0593 0000 LOCK LLC TMS# R614 036 000 0604 0000 K HOVNANIANS FOUR SEASONS AT CAROLINA OAKS LLC TMS# R614 028 000 0002 0000 FIRST CHATHAM BANK TMS# R610 036 000 3213 0000 BEAUFORT CNTY MEM HOSP TMS# R610 036 000 3212 0000 PR II MAY RIVER CROSSING LLC TMS# R610 036 000 0386 0000 EX1.1, C1.1 STARBUCKS COMMERICAL/ RESTAURANT COMMERICAL/ RESTAURANT PUBLIX SUPERMARKET SC HIGHWAY NO. 46 R/W VARIES SCALE: 1" = 200' INDEX ABBREVIATIONS DBL DOUBLE FM FORCE MAIN (SANITARY SEWER) OC ON CENTER SS SANITARY SEWER BOT BOTTOM FP FINISH PAD PC POINT OF CURVE TC TOP OF CURB CB CATCH BASIN FPW FIRE PROTECTION PH POST HYDRANT TH THROAT ELEVATION CI CURB INLET FR FRAME PT POINT OF TANGENT TG TOP OF GUTTER CO CLEAN OUT GI GRATE INLET PVC POLYVINYL CHLORIDE TP TOP OF PAVEMENT CPP CORRUGATED PLASTIC PIPE GV GATE VALVE RCP REINFORCED CONCRETE PIPE TW TOP OF WALK DBL DOUBLE HDPE HIGH DENSITY POLYETHYLENE RC ROLL CURB INLET TYP TYPICAL DI DITCH INLET HI HOODED INLET RCP REINFORCED CONCRETE PIPE VI VALLEY INLET DIP DUCTILE IRON PIPE INV INVERT ELEVATION RI ROOF INLET W WATER EL ELEVATION JB JUNCTION BOX RJP RESTRAINED JOINT PIPE W/ WITH ES END SECTION LF LINEAR FEET R/W RIGHT-OF-WAY WV WATER VALVE FES FLARED END SECTION MAX MAXIMUM SD STORM DRAINAGE YI YARD INLET FG FINISH GRADE MIN MINIMUM SDMH STORM DRAINAGE MANHOLE FH FIRE HYDRANT MH MANHOLE SF SQUARE FEET Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-GN-NT.DWG - Aug 21, 2025 - 2:20 PM DESIGNED: SCALE: REVIEWED: APPROVED: DRAWN: JOB NO: DATE: NO. REVISIONS DATE CLIENT/OWNER: PROJECT LOCATION: DATUM:HORIZ.: VERT.: BY GENERAL NOTES & INDEX G0.1 26430.2000   MAY RIVER CROSSING - CHIPOTLE MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA NAD 83 NAVD 88 ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       08/22/25 TTH GSS MSH GSS                                     50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com                                     GRAPHIC SCALE: 1 INCH = 0 200 FEET 200 100 200 XX1.99 SHEET NUMBERING DETAIL SCALE: NOT TO SCALE SHEET\PAGE NUMBER PREFIX PREFIX C0 COVER SHEET G0 GENERAL NOTES/ LEGENDS G1 GENERAL INFORMATION PLAN EX1 EXISTING CONDITIONS & DEMOLITION C1 SITE LAYOUT - PLAN/PROFILES/DETAILS C2 WATER & SEWER - PLAN/PROFILES/DETAILS C3 PAVING & DRAINAGE C4 GRADING - PLAN/PROFILES/DETAILS EC0 EROSION CONTROL - NOTES/LEGENDS EC1 EROSION CONTROL PHASE 1 - PLAN EC2 EROSION CONTROL PHASE 2 - PLAN EC3 EROSION CONTROL PHASE 3 - PLAN EC4 EROSION CONTROL DETAILS L1 LANDSCAPE - PLAN/DETAILS M MECHANICAL/HVAC A ARCHITECTURAL P PLUMBING E ELECTRICAL V SURVEY/MAPPING PLAN/PROFILE/DETAILS PLAN/PROFILE/DETAILS SPOT ELEVATION LEGEND TOP OF CURB TOP OF WALK BOTTOM OF WALL TOP OF WALL FINISHED GRADE TOP OF PAVEMENT 16.90FG16.90FG 16.9016.90TP 16.9016.90TC 16.9016.90TW 16.9016.90WT 16.9016.90WB TP TC TW WT WB DESCRIPTION PROPOSED EXISTING DRAINAGE LEGEND DESCRIPTION EXISTING PROPOSED PIPE DITCH CURB INLET (CI) CATCH BASIN (CB) CURB INLET - RIGHT (CI) OR CATCH BASIN - RIGHT (CB) OR OR CURB INLET - LEFT (CI) OR CATCH BASIN - LEFT (CB) OR OR CURB INLET - BOTH (CI) OR CATCH BASIN - LEFT (CB) OR OR CONTROL STRUCTURE (CS) DITCH INLET (DI) GRATE INLET (GI) HOODED INLET (HI) OR OR JUNCTION BOX (JB) MANHOLE (SDMH) ROLL CURB INLET (RC) ROOF INLET (RI) YARD INLET (YI) FLARED END SECTION (FES) DRAINAGE LEGEND DESCRIPTION EXISTING PROPOSED PIPE DITCH CURB INLET GRATE INLET JUNCTION BOX OUTLET STRUCTURE WATER LEGEND DESCRIPTION EXISTING PROPOSED WATER MAIN SINGLE SERVICE LATERAL DOUBLE SERVICE LATERAL VALVE AND BOX FIRE HYDRANT W/VALVE & BOX POST HYDRANT REDUCER BACKFLOW PREVENTOR CROSS TEE 90° BEND - HORIZONTAL 45° BEND - HORIZONTAL 22-12° BEND - HORIZONTAL 11-14° BEND - HORIZONTAL BEND - VERTICAL CAP 10"W 10"W OTHER UTILITIES LEGEND DESCRIPTION EXISTING NATURAL GAS TELEPHONE UNDERGROUND TELEPHONE ELECTRICITY UNDERGROUND ELECTRICITY UGG OHT UTL OHP UGP 1. CONTRACTOR SHALL VERIFY LOCATION & DEPTH OF ALL UTILITIES PRIOR TO BEGINNING WORK & NOTIFY ENGINEER OF ANY DISCREPANCIES. 2. THE CONTRACTOR SHALL USE EXTREME CARE NOT TO DAMAGE EXISTING TREES WHICH ARE TO REMAIN. 3. ALL STORM DRAIN PIPE JOINTS SHALL BE WRAPPED WITH FILTER FABRIC. 4. CONTRACTOR SHALL LIMIT CLEARING ACTIVITIES & TREE REMOVAL TO AREAS INDICATED ON PLAN. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AREA CLEARED OUTSIDE THE LIMITS AND ANY DAMAGE TO REMAINING TREES. 5. ALL VERTICAL ELEVATIONS REFER TO NAVD 88 DATUM. 6. ALL HORIZONTAL GEOMETRIES REFER TO NAD83 DATUM. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDERGROUND UTILITIES AND SHALL COORDINATE ALL WORK WITH THE OWNER AND UTILITY COMPANIES. 8. THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANY WAY INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT BIND THOMAS & HUTTON. 9. ALL EXCAVATION AND BACKFILLING SHALL BE PERFORMED IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. 10. ALL PROPOSED ELEVATIONS SHOWN ARE TOP OF PAVEMENT OR FINAL DIRT GRADE (INCLUDING TOPSOIL) IN GRASSED AREAS UNLESS OTHERWISE INDICATED. 11. CALL BEFORE YOU DIG: 1-800-282-7411. FOR COUNTY WATER AND SANITARY SEWER LINE LOCATIONS, CONTACT THE UTILITIES PROTECTION CENTER (1-800-282-7411) A MINIMUM OF SEVENTY-TWO (72) HOURS PRIOR TO DIGGING. 12. GRASSED AND LANDSCAPE AREAS SHALL BE GRADED AS NECESSARY TO PROVIDE POSITIVE DRAINAGE. ALL PRECAUTIONS SHALL BE TAKEN TO PROTECT TREES RETAINED. PROVIDE 4" MIN. TOPSOIL IN ALL LANDSCAPE AREAS. 13. WATER MAINS SHALL BE LAID AT LEAST 10 FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED SANITARY SEWER, STORM SEWER, OR SEWER MANHOLE. THE DISTANCE SHALL BE MEASURED EDGE-TO-EDGE. A MINIMUM 18 INCHES VERTICAL SEPARATION MUST BE MAINTAINED. 14. WHEN CONDITIONS PREVENT A HORIZONTAL SEPARATION OF 10 FEET, THE WATER MAIN MAY BE LAID CLOSER TO A SEWER (ON A CASE-BY-CASE BASIS) PROVIDED THE WATER MAIN IS LAID IN A SEPARATE TRENCH OR ON A UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SEWER AT SUCH AN ELEVATION WHERE THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER. IT IS ADVISED THE SEWER BE CONSTRUCTED OF MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS OF CONSTRUCTION AND BE PRESSURE TESTED TO ASSURE WATER-TIGHTNESS PRIOR TO BACKFILLING. 15. THE MINIMUM DEPTH OF COVER OVER WATER LINES SHALL NOT BE LESS THAN 36" IN ANY CASE. WHERE IT IS IMPOSSIBLE TO MAINTAIN 36" COVER AND 18" MINIMUM SEPARATION, THE 36" COVER WILL BE MAINTAINED AND BOTH WATER AND SEWER LINES WILL BE CONSTRUCTED OF ONE SECTION EACH OF DUCTILE IRON PIPE. THE PIPES SHALL BE SUPPORTED AND CENTERED AT THE CROSSING WITH MECHANICAL JOINTS ON EACH LINE AT BOTH SIDES OF THE CROSSING. 16. THE REQUIRED MINIMUM 3 FT. OF COVER SHALL BE MAINTAINED ON THE EXISTING DOMESTIC AND FIRE SERVICE LINES.  EXTREME CARE SHALL BE TAKEN TO AVOID DAMAGE TO EXISTING WATER VALVES AND HYDRANTS. AT NO TIME SHALL FLOW TO DOMESTIC WATER AND FIRE PROTECTION SUPPLY LINES BE DISRUPTED. 17. PIPE, FITTINGS, VALVES AND OTHER ACCESSORIES SHALL, UNLESS OTHERWISE DIRECTED, BE UNLOADED AT THE POINT OF DELIVERY, AND STORED WHERE THEY WILL BE PROTECTED AND WILL NOT BE HAZARDOUS TO TRAFFIC. THEY SHALL AT ALL TIMES BE HANDLED WITH CARE TO AVOID DAMAGE. THE INTERIOR OF ALL PIPE, FITTINGS AND OTHER ACCESSORIES SHALL BE KEPT FREE FROM DIRT AND FOREIGN MATTER AT ALL TIMES. 18. ANY DEFECTIVE, DAMAGED, OR UNSOUND PIPE SHALL BE REJECTED. ALL FOREIGN MATTER OR DIRT SHALL BE REMOVED FROM THE INSIDE OF THE PIPE BEFORE IT IS LOWERED INTO ITS POSITION IN THE TRENCH AND SHALL BE KEPT CLEAN BY ACCEPTABLE MEANS DURING AND AFTER LAYING. CARE SHALL BE TAKEN TO PREVENT DIRT FROM ENTERING THE JOINT SPACE. AT TIMES WHEN PIPE LAYING IS NOT IN PROGRESS, THE OPEN ENDS OF THE PIPE SHALL BE CLOSED BY ACCEPTABLE MEANS AND NO TRENCH WATER SHALL BE PERMITTED TO ENTER THE PIPE. 19. CLEAN THE INTERIORS OF ALL PIPE BY BRUSHING, SWABBING OR WASHING OUT OF ALL DIRT BEFORE LAYING. 20. FLUSH THE NEW WATER, SEWER, AND NON-POTABLE PIPE LINES UNTIL THE WATER RUNS CLEAR AT THE END OF ALL MAINS AND LATERALS. THIS SHOULD BE COMPLETED AFTER THE PRESSURE TEST AND BEFORE DISINFECTION. A MINIMUM FLUSHING VELOCITY OF 2.5 ft/sec MUST BE ACHIEVED TO PURGE ALL FOREIGN MATERIAL FROM ALL PROPOSED MAINS. 21. ALL JURISDICTIONAL WETLANDS ARE SUBJECT TO FEDERAL PROSECUTION BY THE ARMY CORPS OF ENGINEERS FOR WETLAND VIOLATIONS. 22. THERE ARE NO PROPOSED JURISDICTIONAL WETLAND IMPACTS AS PART OF THIS PROJECT. 23. CONTRACTOR IS RESPONSIBLE FOR CONNECTING BUILDING ROOF LEADS, WATER CONNECTIONS, AND SANITARY CONNECTIONS. ALL LOCATIONS AND ELEVATIONS TO BE VERIFIED WITH BUILDING ARCHITECTURAL, PLUMBING AND FIRE PROTECTION PLANS. CONTRACTOR REQUIRED TO COORDINATE ALL BUILDING LEAD LOCATIONS AND ELEVATIONS WITH BUILDING CONTRACTOR PRIOR TO INSTALLATION. 24. REFERENCE SURVEYS: THOMAS & HUTTON 25. ALL WATER USED FOR CONSTRUCTION SHALL BE METERED THROUGH AN ACCEPTABLE BACKFLOW PREVENTION DEVICE AND FIRE HYDRANT METER OBTAINED FROM EFFINGHAM COUNTY. 26. AN ACCEPTABLE WATER SUPPLY FOR FIRE PROTECTION, EITHER TEMPORARY OR PERMANENT, SHALL BE MADE AVAILABLE AS SOON AS COMBUSTIBLE MATERIAL ARRIVES ON THE SITE. 27. ALL MATERIALS USED AND COME INTO CONTACT WITH DRINKING WATER DURING ITS DISTRIBUTION SHALL NOT ADVERSELY AFFECT DRINKING WATER QUALITY AND PUBLIC HEALTH AND MUST BE CERTIFIED FOR CONFORMANCE WITH AMERICAN NATIONAL STANDARDS INSTITUTE/NATIONAL SANITATION FOUNDATION STANDARD 61 (ANSI/NSF STANDARD 61). 28. IN ALL WATER LINE PROJECTS, CARE WILL BE TAKEN TO KEEP THE INTERIOR OF THE WATER PIPE CLEAN PRIOR TO CONNECTION TO THE COUNTY SYSTEM. THIS WILL BE ACCOMPLISHED BY STRICT ADHERENCE TO BEAUFORT COUNTY SPECIFICATIONS. 29. CONTRACTOR SHALL COORDINATE TIE-IN OF NEW WATER AND SEWER FACILITIES WITH BJWSA. 30. CONTRACTOR RESPONSIBLE FOR PROVIDING ENGINEER AS-BUILT SURVEY IN AUTOCAD FORMAT. AS-BUILT SURVEY TO INCLUDE TWO COPIES OF SURVEY AND BE SIGNED BY REGISTERED LAND SURVEYOR IN THE STATE OF SOUTH CAROLINA. 31. GROUNDWATER RECHARGE - PERMANENT STORMWATER INFILTRATION BASINS SHALL NOT BE CONSTRUCTED IN SIGNIFICANT RECHARGE AREAS HAVING HIGH POLLUTION AND SUSCEPTIBILITY. GENERAL NOTES GENERAL PROJECT/SITE INFORMATION ENGINEER TELEPHONE: (912) 234-5300 COMPANY/DEPT.: THOMAS & HUTTON NAME/TITLE: GRIFFIN SAVEDGE, P.E. ADDRESS: 50 PARK OF COMMERCE WAY, SAVANNAH, GA 31405 GEOTECHNICAL ENGINEER TOPOGRAPHIC AND BOUNDARY SURVEYOR COMPANY/DEPT.: THOMAS & HUTTON ADDRESS: 50 PARK OF COMMERCE WAY, SAVANNAH, GA 31405 TELEPHONE: (912) 234-5300 ARCHITECT COMPANY/DEPT.: TBD ADDRESS: TBD TELEPHONE: TBD TELEPHONE: (952) 941-8660 COMPANY/DEPT.: WILKUS ARCHITECTS ADDRESS: 15 NINTH AVE N, HOPKINS, MN 55343 PROPERTY OWNER ADDRESS: 111 BARNARD STREET, SAVANNAH, GA 31401 COMPANY/DEPT.: N/F FIRST CHATHAM BANK TELEPHONE: (912) 629-2936 NAME/TITLE: TBD SANITARY & WATER SERVICE: TELEPHONE: (843) 987-9250 COMPANY/DEPT.: BEUFORT JASPER WATER & SEWER AUTHORITY ADDRESS: 6 SNAKE ROAD, OKATIE, SC 29909 BEAUFORT COUNTYCOUNTY: ZONING: PUD TOWN OF BLUFFTONMUNICIPALITY: COMMUNICATION SERVICE: TELEPHONE: (912) 291-8341 COMPANY/DEPT.: SPARKLIGHT ADDRESS: 925 FORDING ISLAND RD, BLUFFTON, SC 29928 ELECTRIC & NATURAL GAS SERVICE: TELEPHONE: (843) 816-2907 COMPANY/DEPT.: DOMINION ENERGY ADDRESS: 81 MAY RIVER ROAD, BLUFFTON, SC 29910 DEVELOPER ADDRESS: 1315 WHITTAKER DRIVE, COLUMBIA, SC 29206 NAME/TITLE: TAYLOR WOLFE COMPANY/DEPT.: ONPOINT PARTNERS, LLC TELEPHONE: (803) 261-8776 STORMWATER MANAGEMENT (TOWN): TELEPHONE: (843) 706-4500 COMPANY/DEPT.: TOWN OF BLUFFTON ADDRESS: 1261 MAY RIVER ROAD, BLUFFTON, SC 29910 STORMWATER MANAGEMENT (STATE): TELEPHONE: (843) 953-5324 COMPANY/DEPT.: SCDHEC-OCRM ADDRESS: 13662 MCMILLIAN AVE. SUITE 400, CHARLESTON, SC 29405 BUILDING DEPARTMENT COMPANY/DEPT.: TOWN OF BLUFFTON/BUILDING OFFICIAL ADDRESS: 20 BRIDGE STREET, BLUFFTON, SC 29910 TELEPHONE: (843) 706-7810 FIRE DEPARTMENT: COMPANY/DEPT.: BLUFFTON FIRE DISTRICT ADDRESS: 357 FORDING ISLAND ROAD, BLUFFTON, SC 29910 TELEPHONE: (843) 757-2800 NAME/TITLE: DAN WILTSE NAME/TITLE: ROB CURRALL NAME/TITLE: MATTHEW MICHAELS NAME/TITLE: TRACY TRIMMER NAME/TITLE: DE KELLY PITTINGER NAME/TITLE: ANDREA MORENO COMPANY/DEPT.: PAMELA WINKLER ATTACHMENT 5 Page 26 Section VII. Item #3. LO S52 PONDBERRY ROAD 38 38 35 35 35 35 35 35 35 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 37 37 37 37 37 3737 37 37 37 37 37 37 37 3737 37 37 373737 37 37 37 37 37 37 37 37 37 37 37 37 37 38 38 3838 38 38 38 38 38 38 38 38 38 3838 38 37 37 37 38 38 10" 45° BEND 10" PVC - C900 - DR 18 10" X 6" TEE 6" GV (P24) FH ASSEMBLY (BL4121/6)10" 45° BEND ±176 LF 8" PVC- SDR 26 @ 0.39% MH #08 FR: 37.44 INV.: 32.11 MH #18 FR: 36.09 INV.: 32.32 ±25 LF 8" PVC- SDR 26 @ 0.85% ±18 LF 10" DIP CENTERED ON CROSSINGS (0.5' SEPARATION WATER OVER SEWER) MAY RIVER CROSSING ROAD ±36 LF 10" DIP MAY RIVER CROSSING ROAD ±273 S.F. OF CURB & GUTTER TO BE DEMO AND REMOVED N: 149,238.07 E: 2,006,325.68 N: 149,412.60 E: 2,006,377.58 EXISTING 5' WIDE SIDEWALK EXISTING OFF SITE PARKINGEXISTING OFF SITE PARKING STOP BAR (TYP) PROPERTY LINE TRANSFORMER N/F FIRST CHATHAM BANK R610 036 000 3211 0000 N/F REAL SUB, LLC R610 036 000 0386 0000 STOP SIGN (TYP) HI #49 FR: 36.80 INV.: 31.90 HI #51 FR: 37.00 INV.: 31.90 15" PVC - SDR 26 ±54 LF 18" RCP @ 0.27% SMH #37 FR: 37.44 INV. IN: 30.53 (NE) INV. IN: 31.70 (E) INV. OUT: 28.78 (SW) GI #20 FR: 37.50 INV. IN: 29.17 (N) INV. IN: 30.61 (W) INV. OUT: 29.17 (S) ±48 LF 24" RCP @ 1.95% GI #50 FR: 37.46 INV. IN: 30.10 (N) INV. IN: 30.10 (E) INV. IN: 30.11 (W) INV. OUT: 30.10 (S) ±24 LF 18" RCP @ 0.33% INV.: 30.18 ±145 LF 24" RCP @ 0.33% GI #63 FR: 36.60 INV. IN: 30.71 (E) INV. IN: 30.58 (W) INV. OUT: 30.58 (S) ±24 LF 18" RCP @ 0.16% INV.: 30.67 CI #8 FR: 35.53 INV.: 30.86 ±28 LF 18" RCP @ 0.32% CI #6 FR: 35.53 INV.: 30.33 ±28 LF 18" RCP @ 0.29% 1" = 10' Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-EX-PL.DWG - Aug 21, 2025 - 2:20 PM DESIGNED: SCALE: REVIEWED: APPROVED: DRAWN: JOB NO: DATE: NO. REVISIONS DATE CLIENT/OWNER: PROJECT LOCATION: DATUM:HORIZ.: VERT.: BY EXISTING CONDITIONS & DEMO PLAN EX1.1 26430.2000   MAY RIVER CROSSING - CHIPOTLE MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA NAD 83 NAVD 88 ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       08/22/25 TTH GSS MSH GSS                                     50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com                                     GRAPHIC SCALE: 1 INCH = 0 10 FEET 10 5 10 ATTACHMENT 5 Page 27 Section VII. Item #3. LO S52 PONDBERRY ROAD MAY RIVER CROSSING ROAD MAY RIVER CROSSING ROAD 10" X 6" TEE 6" GV (P24) MH #08 FR: 37.44 INV.: 32.11 PROPOSED BUILDING ±2385 S.F. 12'R 12'R 5'R 20'R 10'R 30'R 30'R 30'R 3'R 12'R 3'R 3'R 60°0'0" 12'R 3'R 60°0'0" 60°0'0" DUMPSTER LOCATION 5' WIDE SIDEWALK 18" CATCH CURB & GUTTER 21' 11' 6' CONCRETE WHEEL STOP 6' CONCRETE WHEEL STOP 77' - 4 PARKING SP & 2 ADA SP @ 11' X 21' 72' - 8 PARKING SP @ 9' X 18' 9' 18' 21' 11' 77' - 7 PARKING SP @ 11' X 21' 77' - 7 PARKING SP @ 11' X 21' 11' 21' 26' 1.28' 23.55' 14.63' 28' 24' 24' 25.55' 24" THERMOPLASTIC STOP BAR 24" STOP BAR (TYP) 5' WIDE SIDEWALK 5.22' 15.28'38.59' 8' 5' 15.93' 23.74' 5' WIDE SIDEWALK 18" CATCH CURB & GUTTER 18" CATCH CURB & GUTTER 18" CATCH CURB & GUTTER 18" CATCH CURB & GUTTER CROSSWALK STRIPING STRAIGHT ARROW PAVEMENT MARKING (TYP) STANDARD WORD PAVEMENT MARKING STRAIGHT ARROW PAVEMENT MARKING (TYP) 20.27' 4" PAVEMENT SOLID WHITE STRIP PHASE WORK LIMIT PHASE WORK LIMITS PROPOSED COMMERCIAL WATER LATERAL EXISTING - OFFSITE PARKING - 7 SPACESEXISTING - OFFSITE PARKING - 8 SPACES PHASE WORK LIMIT 5'R CLEAN OUT (TYP) PROPOSED COMMERCIAL SEWER LATERAL CONNECT TO EXISTING STORMWATER RCP STUB OUT GRATE INLET 1" = 10' Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-ST-PL.DWG - Aug 21, 2025 - 2:21 PM DESIGNED: SCALE: REVIEWED: APPROVED: DRAWN: JOB NO: DATE: NO. REVISIONS DATE CLIENT/OWNER: PROJECT LOCATION: DATUM:HORIZ.: VERT.: BY SITE PLAN C1.1 26430.2000   MAY RIVER CROSSING - CHIPOTLE MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA NAD 83 NAVD 88 ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       08/22/25 TTH GSS MSH GSS                                     50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com                                     GRAPHIC SCALE: 1 INCH = 0 10 FEET 10 5 10 ATTACHMENT 5 Page 28 Section VII. Item #3. PAVEMENT ARROW DETAIL NOT TO SCALE 6'-0" 3'-2" 4'-6" 5'-0" 9'-6" 11" 2'-6" 8'-0" 1'-0" 2'-10" 2'-6" 2'-2" 2'-3"R 3'-4"R 1'-11" 2'-3" 2'-6" 2'-3" 5'-0" 6'-6" 11'-6" 11" 2'-3" 6'-0" 2'-6" 2'-10" 2'-3" 3'-6" 1'-0" 3'-2" 5'-6" 3'-4"R 2'-3"R 1'-11" 2'-6" 2'-2" 8'-0" 7'-11" 4" (TYP.) OCT. 2008 T2 THOMAS & HUTTON ENGINEERING CO. ACCESSIBLE PARKING SPACE STRIPING DETAIL EDGE OF PAVEMENT OR FACE OF CURB 6' WHEEL STOP (IF REQUIRED) VARIES - SEE PLANS 24" 4" PAINTED BLUE STRIPE (TYP.) 4" PAINTED WHITE STRIPE (TYP.) 45° 96" MIN. 96" MIN. 15' 4'4' 24" INTERNATIONAL BLUE SYMBOL 3' ALIGN DETECTABLE WARNING WITH CENTERLINE OF LANDING AREA AND BACK OF CURB LINE. DETECTABLE WARNING SHALL EXTEND FULL WIDTH OF CURB RAMP. NOTES: 1. STRIPING AND CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND SPECIFICATIONS. 2. 2% MAXIMUM SLOPE IN ALL DIRECTIONS WITHIN ACCESSIBLE PARKING SPACE AND ACCESS AISLE. 3. ONE IN EVERY 8 ACCESSIBLE SPACES SHALL BE SERVED BY AN 8' WIDE ACCESS AISLE AND SHALL BE DESIGNATED "VAN ACCESSIBLE". 24" 1:50 (2%) SLOPE MAX NOT TO SCALE FEB. 2009 A3.1 THOMAS & HUTTON ENGINEERING CO. 60" MIN. FOR STANDARD ACCESSIBLE SPACE OR 96" MIN FOR VAN ACCESSIBLE SPACE (SEE PLAN FOR LOCATION) CONCRETE WHEEL STOP DETAIL NOT TO SCALE 11" 6'-0" 5" 3'-4" 12"4" 12" 4" 6" 6" 6" 11" 3"4" 4" 5" NO.4 REBAR NO.4 REBAR EMBED IN PAVEMENT 6" OCT. 2008 P27 THOMAS & HUTTON ENGINEERING CO. NOT TO SCALE STOP SIGN BACKROUND - RED REFLECTORIZED PAINT LEGEND - WHITE REFLECTORIZED PAINT COLORS 5/8" 10"10" 4" 24" 8" 8" 8" 24" OCT. 2008 T7 THOMAS & HUTTON ENGINEERING CO. 24" 18" 30" 30" 30" 24" 30" 30" 30" 7'-0" 2'-6" 3'-0" 2'-6" R5-1 W1-1R W1-1L 30" 36" R4-4 R1-1 R1-2 W1-10L R6-2R 30" 30" R2-1 ROAD SIGN DETAILS NOT TO SCALE POST - GALVANIZED U CHANNEL WEIGHT = 2 LBS/FOOT OCT. 2008 T4 THOMAS & HUTTON ENGINEERING CO. NOT TO SCALE SIGN POST DETAIL SIGN 3 1/2" 27/32" 1 13/16" 1 1/4" 1" 8" 18" NOTE: POST SHALL BE CAREFULLY CLEANED AND PHOSPHATED. IMMEDIATELY AFTER PHOSPHATING POST SHALL BE COATED WITH A MODIFIED POLYESTER PAINT BY ELECTRODEPOSITION AND THEN THOROUGHLY BAKED. COLOR IS PERMA-GREEN PER FED. STANDARD 595-A COLOR #14109 (DARK LIMIT V-) 3" 5/16" MACHINE SCREW OR BOLT NUT & LOCK WASHER 4 LB/FT U CHANNEL (GALVANIZED) 3/8"Ø PUNCHED HOLES @ 1" O.C. FOR 36" 36" OCT. 2008 T6 THOMAS & HUTTON ENGINEERING CO. NOT TO SCALE STREET SIGNS 2'-0" MIN. CONCRETE SIDEWALK 3:1 SAND/CEMENT MIX (DAMP) MIN. 24" SIGN BOLTED TO POST (TYP) (SIGN BLANK IS PRE-PUNCHED) 9'-0" 24" OR LARGER 7'-0" 18" OR LARGER HOLE APPROX. 6"Ø X 3'-0" DEEP 9'-0" 24" OR LARGER 7'-0" 18" OR LARGER SIGN POST CONCRETE SIDEWALK 3:1 SAND/CEMENT MIX (DAMP) HOLE APPROX. 6"Ø X 3'-0" DEEP SIGN POST OCT. 2008 T5 THOMAS & HUTTON ENGINEERING CO. DETECTABLE WARNING DETAIL NOT TO SCALE NOTE: 1. DETECTABLE WARNING SHALL CONSIST OF RAISED TRUNCATED DOMES WITH A DIAMETER OF NOMINAL 0.9 INCHES, A HEIGHT OF NOMINAL 0.2 INCHES AND A CENTER TO CENTER SPACING OF NOMINAL 2.35 INCHES AND SHALL CONTRAST VISUALLY WITH ADJOINING SURFACES. IF THE SIDEWALK AND RAMP ARE CONSTRUCTED OF CONCRETE, THE WARNING AREA SHALL BE RED BRICK IN COLOR. IF THE SIDEWALK AND RAMP ARE CONSTRUCTED OF RED BRICK, THE WARNING AREA SHALL BE GRAY IN COLOR. THE COLOR USED TO PROVIDE CONTRAST SHALL BE AN INTEGRAL PART OF THE WALKING SURFACE. 2. BRICK PAVERS SHALL BE SET IN A WET MORTAR BED ON A 4" MIN. THICK CONCRETE FOUNDATION. FEB. 2009 A2.1 THOMAS & HUTTON ENGINEERING CO. 8" PARKING" SYMBOL PAVEMENT "RESERVED 3" 1'-8" R 1'-0" 8" 1'-6" 5° 2'-0" R 1'-0" 67° 1'-0" 6" R 2'-0" TRAFFIC STRIPING 4" ROYAL BLUE 4" PARKING SPACE CENTERLINE OF CROSSWALK STRIPING DETAIL 8" BOTTOM 8" SOLID 8" SOLID 8" GAP, TYP. 6' TYP. NOT TO SCALE 8' LENGTH VARIES (O.C.) WHITE WHITE BAR OCT. 2008 T9 THOMAS & HUTTON ENGINEERING CO. 1'-8" 1'-8" 1'-8" 1'-8" 5 1/2" 5 1/2" 10" STOP BAR 4' TYP. 8'-5" 1'-6" 2'-0"8'-0" VARIES, SEE SITE PLAN WHITE REFLECTIVE NOT TO SCALE TYPICAL PAVEMENT MARKINGS TRAFFIC PAINT NOTE: ALL TRAFFIC MARKINGS TO BE SOLID WHITE REFLECTIVE TRAFFIC PAINT AS PER DIMENSIONS ABOVE OCT. 2008 T1 THOMAS & HUTTON ENGINEERING CO. 1" = 1' Z:\26430\26430.2000\ENGINEERING\DRAWINGS\CONSTRUCTION PLANS\26430.2000-ST-DT.DWG - Aug 21, 2025 - 2:21 PM DESIGNED: SCALE: REVIEWED: APPROVED: DRAWN: JOB NO: DATE: NO. REVISIONS DATE CLIENT/OWNER: PROJECT LOCATION: DATUM:HORIZ.: VERT.: BY SITE DETAILS C1.2 26430.2000   MAY RIVER CROSSING - CHIPOTLE MAY RIVER CROSSING BLUFFTON | BEAUFORT COUNTY | SOUTH CAROLINA NAD 83 NAVD 88 ONPOINT PARTNERS, LLC 1315 WHITTAKER DRIVE COLUMBIA, SOUTH CAROLINA 26206       08/22/25 TTH GSS MSH GSS                                     50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com                                     GRAPHIC SCALE: 1 INCH = 0 1 FEET 1 .5 1 ATTACHMENT 5 Page 29 Section VII. Item #3. PLAN REVIEW COMMENTS FOR DP-08-25-019908 Town of Bluffton Department of Growth Management 20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910 Telephone 843-706-4522 TOWNE CENTRE AT NEW RIVERSIDE Plan Type: Apply Date: Plan Status: Plan Address: 20 Pondberry Street BLUFFTON, SC 29910 Development Plan Active 08/22/2025 Plan PIN #:Case Manager: R610 036 000 3211 0000Dan Frazier Plan Description: A request by OnPoint Partners, LLC on behalf of First Chatham Bank, for approval of a Preliminary Development Plan application. The project consists of the construction of a single-story 2,385 SF restaurant with associated infrastructure. The property is within the Jones Estate Planned Unit Development (PUD) consists of 0.75 acres identified by tax map number R610 036 000 3211 0000 within the May River Crossing Master Plan at the intersection of May River Crossing Road and Pondberry Road. STATUS: This item was heard at the October 8, 2025 Development Review Committee meeting. Per mutual agreement, the Applicant to submit new site plan by 10/10/25 for a 2nd DRC meeting on 10/22/25. Resubmit by 10/24/25 to tentatively be placed on 11/19/25 PC Agenda. Technical Review Submission #: 2 Received: 10/17/2025 Completed: 10/17/2025 Reviewing Dept. Complete Date StatusReviewer Approved with Conditions10/17/2025Planning Review - Principal Dan Frazier Comments: 1. The site plan is consistent with the design requirements of the approved May River Crossing Master Plan. 2. An approval letter from the applicable POA/ARB is required prior to development plan approval. 3. The subject parcel is within the Highway Corridor Overlay District (HCOD) and will require a Certificate of Appropriateness – Highway Corridor Overlay District (COFA-HCOD) reviewing landscaping, lighting, and architecture at time of final development plan approval. 4. A foundation planting area at least 8' wide shall be maintained around all structures (UDO Section 5.3.7.E). A foundation planting width less than 8 feet wide can be approved subject to staff review. 5. Widen the Splitter Island to allow landscape plantings. 6. Relocate dumpster enclosure to adjacent to building. Extend building wall to serve as the shelter enclosure wall between the dumpster and park amenity. This creates a wider facade for the building, more in accordance with the Initial Master Plan exhibit. 7. Relocate the two parking spaces closest to the tree to the area where the dumpster is currently shown. 8. Realign stormwater infrastructure further from tree. 9. Coordinate with the declarant to relocate the ADA parking currently shown adjacent to the dumpster to the existing parking closest to the restaurant building. 10. For the crosswalk, use a different surface material (such as pavers) or incorporate a speed hump. 11. Provide parking stops in all parking stalls. Approved with Conditions10/17/2025Watershed Management Review DRC Samantha Crotty Comments: Comments may be provided at time of DRC meeting. 10/17/2025 Page 1 of 1 ATTACHMENT 6Page 30 Section VII. Item #3. October 9, 2025 Mr. Dan Frazier, Planning Manager Town of Bluffton 20 Bridge Street Bluffton, SC 29910 Re: May River Crossing – Chipotle Bluffton, South Carolina PDP Comment Response DP–08–25–019908 Dear Mr. Frazier: On behalf of our client OnPoint Partners, LLC , regarding comments for May River Crossing - Chipotle, Preliminary Development Plan review that were issued on October 3, 2025, we offer our responses (in bold italics). Also, please find the following items enclosed per your request: • Revised Preliminary Development Plans • Revised Preliminary Compliance Calculator Watershed Management – Revisions Required 1. Post Development Land Cover Totals must match (or be very similar to Contributing Drainage Area Totals in the Compliance Calculator. Revise Response: The preliminary compliance calculator for this project has been revised to show a closer approximation to runoff land cover expected to drain toward pervious paver parking spaces and impervious surface disconnection. The majority of the “Turf Cover” left over in post –development is non –impacted area left over from pre –development and therefore is not proposed to drain to a BMP. The majority of the proposed impervious areas are draining to BMP(s) prior to entering the offsite drainage system. While the area submitted for permitting is +/– 1.12 acres, the total project limits considered for the preliminary compliance calculator(“PL” on Sheet C1.1) is +/– 0.71 acres. Planning Review – Revisions Required 1. The site plan does not meet the design requirements of the approved May River Crossing Master Plan. Resubmit the site plan to conform to the approved master plan or request to amend the master plan Response: Revised. The updated layout, as seen and discussed at DRC on 10/8/2025, has been provided with this resubmittal, with minor changes including: • Asphalt pavement under the dumpster location The updated site layout features a building footprint that has been shifted to front the adjacent park amenity while maintaining UDO requirements for parking spaces and drive aisles. ATTACHMENT 7 Page 31 Section VII. Item #3. Mr. Dan Frazier Town of Bluffton October 9, 2025 Page 2 2. To conform to the master plan, the building must move eastward to front on the park amenity. A drive through lane cannot wrap around the building and route between the restaurant building and the park amenity. These comments were provided at the pre – application meeting and not addressed with the current application Response: Revised. See above response. 3. A preliminary development plan resubmittal is required to address non–conformance with the approved master plan. The revised application will return to the Development Review Committee for review and comment Response: Acknowledged understanding a review timeline and schedule as laid out in an email from the Town on 10/8/2025, pending resubmittal package completion and comment response letter. 4. An approval letter from the applicable POA/ ARB is required prior to development plan approval Response: Acknowledged. 5. The subject parcel is within the Highway Corridor Overlay District (HCOD) and will require a Certificate of Appropriateness – Highway Corridor Overlay District (COFA –HCOD) reviewing landscaping, lighting, and architecture at time of final development plan approval Response: Acknowledged. Planning Review Addressing – Approved with Conditions 1. If applicable, contact Ryan Colman, Town of Bluffton GIS Manager to request addressing Response: Acknowledged. We thank you for your attention to this project and look forward to receiving your approval. Please feel free to contact our office with any questions. Sincerely, THOMAS & HUTTON Griffin Savedge, PE Enclosures ATTACHMENT 7 Page 32 Section VII. Item #3.

Source: Town of Bluffton website. First collected Nov 14, 2026.