HP-24-21, 417 W. Hampton Ave. - Staff Report
City of Sumter · Sumter County · Other
Open the original document More from City of Sumter
This document is no longer listed on City of Sumter's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Sumter Historic Preservation
Design Review
February 13, 2025
HP-24 -21, 417 W. Hampton Ave. (City)
I. THE REQUEST
Applicant: City of Sumter
Status of the Applicant: Property Owner
Request: Request for Design Review Approval to demolish existing
restroom building, construct new restroom building, install
new playground system and associated walkways, and repair
existing gazebo structure.
Location: 417 W. Hampton Ave.
Present Use/Zoning: City Park / Residential 6 & Residential-9 (R-6/R-9)
Tax Map Reference: 228-11-02-019
Adjacent Property Land
Use and Zoning:
North –Residential / Residential-9 & Residential-6 (R-9/R-6)
South – Residential / Residential-6 (R-6)
East – Residential / Residential-6 (R-6)
West – Residential / Residential-9 & Residential-6 (R-9/R-6)
II. BACKGROUND
417 W. Hampton Ave. is a City park facility
known as Memorial Park.
The applicant is requesting Design Review
Board approval to demolish the existing
restroom building, construct a new restroom
building, install a new playground system
and associated walkways, and to repair an
existing gazebo structure.
2
ARCHITECTURAL/HISTORIC CONTEXT:
Memorial Park, located in the heart of the Hampton Park Historic District, is a n
8.68 acre landscaped city park with walking path, trees, and shrubs. I n the center
of the park is a gazebo with a brick base. Tuscan columns support a pedimented
gable end terra cotta tiled roof. The site is classified as site #89 in the 1980 Historic
Resources Survey of the Hampton Park District.
The property w as deeded to the City in 1919 and dedicated in remembrance of the
citizens of Sumter who fought in World War I. The park contains a monument with
the following inscription:
“In solemn and thankful remembrance of the unselfish and patriotic
sacrifice on the part of the brave men of Sumter County who served in
the forces of the United States of America in the war against Germany
and her allies for the preservation of the rights of mankind throughout
the world. This park is given and dedicated in perpetuity for the use of
the people of Sumter.
Deed of gift in trust executed by thirty-seven citizens, August 1st, 1919.”
The park also contains a playground area featuring a central play area and two
swing sets, as well as a small restroom facility adjacent to the parking lot on the
park’s N. Salem St. side.
In 2005, the City of Sumter obtained approval via HP -05-22 to demolish a
dilapidated concrete block bathroom facility (15’x27’) at Memorial Park that was
originally damaged by Hurricane Hugo. Construction of a new restroom facility,
fencing, and associated improvements was later approved via HP-06-22.
Additionally, though not directly related to this request, i n August 2017, approval
was granted for a Demolition Permit to remove the 3,766 sq. ft. community building
located at 110 N. Salem Ave. Demolition of the structure was completed making
way for reconfiguration of the parking area in Memorial Park and for construction
of a new free- standing community center building. In September of 2017, a plan
was approved via HP-17-17 for a stand -alone community center building to be
constructed on the site of 110 N. Salem Ave., however the City elected instead to
pursue an alternate design which allow ed for expansion of the Memorial Park
parking lot while preserving the Rutledge House at 407 W. Hampton Ave. This
plan, approved via HP -18-13, preserved the John Rutledge Sumter House through
an adaptive reuse plan while providing an overall space of 4,030 sq. ft. for
community use in scale with the existing residential construction in the Hampton
Park Historic District. In addition, the plan result ed in 52 off-street parking spaces
in the N. Salem Ave. parking lot for Memorial Park.
3
The site is located in the Hampton Park Historic Overlay District, and is considered
a contributing site to the fabric of the District.
CURRENT CONDITIONS
Above: Existing park restroom building (front
view)
Above: Existing park restroom building (side
view)
Above: Gazebo at park center Above: existing playground area
SCOPE OF WORK:
The applicant proposes to perform the following work:
A. Demolish existing restroom building
B. Construct new restroom building
C. Install new playground system and associated walkways
D. Repair existing Gazebo
4
Figure 1 - Overall Layout of Memorial Park
Figure 2 - Diagram showing Location of Restroom Building
5
Existing Restroom Building
Elevation Diagrams
Proposed New Restroom
Building Elevation Diagrams
6
Figure 3 - Proposed New Playground Rendering
Figure 4 - Proposed New Playground Site Plan
7
DESIGN REVIEW:
The proposed work requires design review approval beforehand. The Design Review
Guidelines Manual states:
5.1 Trees and Plantings
A. Maintain historic trees and plantings.
Protect and retain existing trees and plants wherever possible.
B. Devise a planting scheme that complements the building and the overall district.
Design landscaping to be secondary to the historic building.
Do not use large trees and plants that will conceal or obscure the primary elevation.
Use low plants and shrubs along sidewalks and walkways.
Use plant materials native to the Midlands of South Carolina to ensure their health
and longevity.
Plant trees and bushes several feet away from the foundation of a building to prevent
root damage and moisture infiltration.
Staff Analysis:
The applicant proposes to remove one mature tree classified as an invasive species
(Bradford Pear), and to update plantings in conjunction with the new playground and
its pathway system.
The Tree and plantings guidelines are recommended practices only, they are not
enforced by the Design Review Committee. The landscaping plan for the park will be
designed and overseen by the City’s Arborist/Horticulturalist.
5.3 Driveways, Walkways, and Ramps
A. Maintain traditional walkway configurations.
Retain and repair historic walkways and their materials.
Use paving materials that complement the architectural style of the site.
Use the same materials for driveways and walkways to maintain design consistency.
Staff Analysis:
The current park contains a series of interconnected cinder walking paths, primarily
oriented in a loop around the park boundary bisected with straight paths through the
center. The scope of this project includes installation of a concrete loop connecting the
restroom building, playground, and the Meeting House.
6.1 Commercial Properties
8
B. Design new buildings to reflect their own time.
Avoid the direct imitation of a historic style that would blur the distinction between
old and new.
Avoid any reference to historic styles that precede the growth and development of the
district.
Staff Analysis:
The proposed new restroom building is a simple brick construction, reflecting the
building’s utilitarian nature. While the design departs from the imitative design of the
existing restroom, the intent is to construct a durable building that will not be subject to
the same environmental factors that have influenced the short lifespan of the existing
structure (moisture, insects). While the building is visible from public streets (N. Salem
Ave. and W. Hampton Ave.), it is not prominent, and will blend in to its surroundings
based on the red brick exterior finish.
The existing gazebo structure at the center of the park is considered a historic structure.
No changes to the building are planned, though extensive repairs and replacement of
deteriorated materials with “like-for-like” materials is planned.
7.2 Demolition
A. Demolish a historic building only after all alternatives have been exhausted.
Provide an explanation of alternatives that were explored and the reasons why they
were not feasible options.
Prepare a detailed plan for the development of the site that includes a budget for both
the demolition and the new construction, as well as a timetable.
Document the building prior to demolition to include measured drawings,
photographs, and a detailed history of the property.
Staff Analysis:
The existing restroom building, constructed in the late 2000s, has deteriorated quickly,
due to a combination of insect damage and moisture issues based on its location and the
topography of the park. The existing building has been determined by the City’s Public
Services Department to be deteriorated beyond reasonable repair, and replacement of
the structure is the most economical measure that can be taken. Because the building
is not considered historic, having been constructed less than 20 years ago, removal and
replacement is the most effective course of action.
9
III. STAFF RECOMMENDATION
Staff has evaluated the proposed scope of work, and finds that the planned changes
are consistent with the Design Guidelines. Approval is recommended.
IV. DRAFT MOTION
1) I
move the City of Sumter Design Review Board approve HP-24-21 in
accordance with the materials, photographs, construction details submitted
and staff recommendation referenced in the Staff Report based on compliance
with Design Review Guidelines.
2) I m
ove the City of Sumter Design Review Board deny HP-24-21.
3) I move the City of Sumter Design Review Board enter an alternative motion.
V. DESIGN REVIEW BOARD – January 23, 2025
The Historic Preservation meeting for Thursday, January 23, 2025, was canceled
due to inclement weather.
VI. DESIGN REVIEW BOARD – FEBRUARY 13, 2025
Source: City of Sumter website. First collected Nov 14, 2026.