Planning Commission Worksession (Agenda Packet)
City of Beaufort · Beaufort County · meeting of Feb 4, 2025 · Agenda packets
Open the original document More from City of Beaufort
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF BEAUFORT
PLANNING COMMISSION
WORKSESSION AGENDA
1911 Boundary Street, Beaufort, SC 29902
Phone: 843-525-7011 ~ Fax: 843-986-5606
Tuesday, February 4, 2025, 3:00 P.M.
City Hall, Planning Conference Room, 1st Floor – 1911 Boundary Street, Beaufort, SC
STATEMENT OF MEDIA NOTIFICATION: "In accordance with South Carolina Code of Laws,
1976, Section 30-4-80(d), as amended, all local media were duly notified of the time, date, place and agenda of
this meeting."
I. Public Comment
II. Discussion of Final Chapter 7 Standards
III. Discussion of Final Chapter 9 Development Review Standards
IV. Discussion of Chapter 5 Landscaping, Parking, and Lighting
V. Public Comment
VI. Adjournment
Note: If you have special needs due to a physical challenge, please call Julie Bachety at (843) 525-7011.
PLANNING COMMISSION
February 10th, 2025
Code Amendment Packet
DEVELOPMENT CODE
Chapter 7 – Amendments
as of January 13 th, 2025
(Clean Copy )
Beaufort, South Carolina, The Beaufort Development Code
7: LAND DEVELOPMENT
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 1 of 43
7: LAND DEVELOPMENT
7.1: IMPROVEMENT REQUIREMENTS
7.1.1 PURPOSE
The purpose of these land development requirements is to:
A. Encourage economically sound and environmentally sensitive development.
B. Assure the timely provision of required streets, utilities, and other facilities and services to new land
developments.
C. Assure the adequate provision of safe and convenient vehicular and pedestrian traffic access and
circulation in and through new land developments.
D. Assure the provision of needed open spaces and building sites in new land developments through the
dedication or reservation of land for recreational, educational, and other public purposes.
E. Assure, in general, the wise and timely development of new areas, in harmony with the Comprehensive
Plan of the city.
F. Encourage new subdivision developments that complement the City's historic development pattern.
G. Promote compact, well-defined, sustainable neighborhoods that enhance the City's character.
H. Create livable neighborhoods that foster a sense of community and reduce dependency on vehicles.
I. Encourage the proper arrangement of new streets in relation to existing or planned streets and
ensure streets facilitate safe, efficient, and pleasant walking, biking and driving.
7.1.2 APPLICABILITY
A. Unless noted otherwise in this section, all new development projects shall be required to have public
sewer and underground wiring, and shall comply with Section 7.2.3 (Lot Access Standards).
B. All development — with the exception of projects that qualify as Minor Development Design Review or
Minor Subdivision, or are located in the Historic District, and affect less than one whole block face —
are required to install or construct the improvements specified in the Table of Required Improvements
(Section 7.1.3).
C. The applicant shall be responsible for the installation and construction of required improvements
according to the provisions of this Code, except as may otherwise be specifically provided herein or by
agreement.
D. Approval of a Final Subdivision Plat shall be subject to the applicant having installed the improvements
designated in this article, or having guaranteed (Section 7.1.5), to the satisfaction of the city, the
installation of said improvement.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 2 of 43
7.1.3 TABLE OF REQUIRED IMPROVEMENTS
ZONING DISTRICT
REQUIRED
IMPROVEMENTS3
SECTION
REFERENCE
T1 T3-
S
T3-
N
T4-
HN
T4-
N
T5-
DC
T5-
UC
RMX IC LI MHP
Public Water and
Hydrants
7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Public Sewer 7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Paved Streets1 7.2.4 □ ■ ■ ■ ■ ■ ■ ■ ■
Streetscape2 Appendix C □ ■ ■ □ ■ ■ ■ ■ ■ ■ ■
Underground
Drainage
7.1.3.A □ ■ ■ ■ ■ ■ ■ ■ ■ ■ □
Curb and Gutter Appendix C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Sidewalks 7.2.4.C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Street Trees 7.2.5 □ □ ■ ■ ■ ■ ■ ■ ■ □ □
Street Lights n/a □ □ □ □ ■ ■ ■ ■ ■ ■ ■
Street Signs
(private streets)
n/a ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Underground
Wiring On-Site
7.1.3.C ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Community
Green Space and
Open Space
Space
7.4 □ ■ ■ □ ■ □ ■ ■ ■ □ □
■ required improvements by
district
□ may be required at the discretion of the Planning Commission
based on existing conditions, surrounding context, and street
section (Appendix C)
1 Rear lanes/alleys may be permitted to be paved with pervious material, such as gravel, depending
on the location.
2 Complete street requirements shall be coordinated with the specific street section found in the
regulating plan in Appendix C.
3 For Infill and Redevelopment, as defined in Section 8.3.2, these items [referring to the table of
required provisions} are required to the extent feasible based on existing conditions including roads,
utilities and adjacent buildings.
A. Street Improvements: Land designated for public streets shall be cleared and filled in accordance with
the latest edition of the "South Carolina Standard Specifications for Highway Construction", South
Carolina State Highway Department, or as determined appropriate by the adm inistrator. No land may
be disturbed until a Building Permit has been issued (Section 9.5). See Section 5.4 for Tree Removal
Standards. See Section 7.2 for more standards on street location. See Appendix C for Street Regulating
Plan and Design Standards.
B. Water and Sewer Facilities: Water and sewer facilities shall be provided in accordance with the
standard procedures and policies of the water and sewer provider and the South Carolina Department
of Environmental Services (SCDES) and shall be approved by the water and sewer provider.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 3 of 43
C. Utility lines: All utility lines within a development site shall be installed underground . The Planning
Commission may approve an exception only in cases where there are existing above-ground lines that
serve the property.
7.1.4 SURVEY AND ENGINEERING
A. Installation of Permanent Reference Points: Permanent reference points shall be placed in accordance
with the following requirements:
1. General Standards: Boundary surveys shall be performed, in accordance with the state minimum
standards published by the State Board of Registration for Professional Engineers and Land
Surveyors, unless more stringent requirements are specified. A minimum of two points in an y
survey must be tied to the state plane coordinate system. The survey may be done on the
horizontal ground distance and tied back to the state plane coordinates.
2. Control Monuments: Vertical control monuments shall be placed in or near the centerline of
pavement of subdivision streets at a minimum of 1 per 4 acres. Where practical, control
monuments shall be placed at points of curvature and points of tangency of curves. The control
monument may be poured on the job or be a concrete marker of the type commonly used in the
area: at least 3 feet long and tapered with a 12-inch long, ¼-inch diameter brass or bronze rod
embedded in the top. Control monuments shall be placed in a cast iron water main valve type
box with a cover flush with the pavement.
3. Property Marker: A steel or wrought iron pipe, rebar, or the equivalent, not less than 0.5 inches
in diameter and at least 24 inches in length shall be set at all property corners and points of
curves, except those located by monuments. They shall be flush with the ground .
4. Accuracy: Land surveys within the city limits shall be Class A surveys, set at an accuracy of at least
1:10000.
7.1.5 IMPROVEMENT GUARANTEES
A. Types Allowed: Prior to approval of a Final Subdivision Plat the applicant shall provide a performance
guarantee to ensure the completion of required improvements within a period of time as agreed upon
by the Administrator and the applicant, and expressed in the guarant ee. Such guarantee may be in the
form of a performance bond, a surety bond, a cash deposit, or a letter of credit. A performance
guarantee shall be posted in the amount of 125% of the total cost of improvements.
1. Performance/Surety Bonds and Letters of Credit: The performance or surety bond, or letter of
credit, shall be in a form acceptable to the city. It shall include a pledge by the bank, insurance
company or other bonding/lending institution that the funds necessary to carry out the terms of
the agreement are guaranteed for payment and will be released only upon receipt of written
instruction from the city.
2. Cash Deposits: If surety is in the form of a cash deposit with the City of Beaufort, proportional
parts thereof shall be refundable in relation to progress payments less retainage, subject to
approval of the city and subject to a minimum deposit balance of 25% of the pr oject cost.
3. Maintenance Guarantees: If the applicant completes all required improvements and complies
with all conditions of the subdivision agreement as determined by the city, the remainder of
monies retained by a financial institution or by the city may be released to the applicant or hi s
successor in title. Prior to release, the applicant shall provide the city, prior to the issuance of any
building permit, a performance bond, a surety bond, or a cash deposit equal to the amount
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 4 of 43
determined by the city that would ensure the repair of any damage to the existing improvements
during the course of any construction, but in no case will the amount of the security be less than
$1,000.00 for each individual building lot. Prior to the issuance of any certificate of occupancy,
the city shall determine whether or not any breakage or damage has occurred. If no damage to
any off-site improvements has occurred, then the city may release the security to the applicant
or his successor in title. If damages have occurred, they shall be repaired, or the city may draw on
the security before it is released.
7.1.6 EASEMENT AND UTILITY STANDARDS
A. Multiple installations within easements: Easements shall be designed so as to provide efficient
installation of utilities. Public utility installations shall be located as to permit multiple installations
within the easements. The developer will establish final utility grades prior to utility installations.
Public utility easement dedication shall be required with any minor or major subdivision action.
B. Underground utilities: Telephone lines, electric lines, cable television lines and other like utility services
shall be placed underground. The applicant or developer shall be responsible for complying with the
requirements of this Section and shall make the necessary arrangements including any construction or
installation charges with each utility provider for the installation of such underground facilities.
Transformers, switching boxes, meter cabinets, pedestals, ducts and other facilities necessaril y
appurtenant to such underground utilities shall be placed underground or on the surface but not
on utility poles. Screening or fencing is required subject to approval of the City. Electric transmission
and distribution feeder lines and necessary appurtenances thereto may not be placed above ground
unless they are carrying greater than 115 kV. Upon approval of the City, such facilities shall be placed
within easements or rights-of-way provided for particular facilities.
7.2: STREET NETWORK AND DESIGN STANDARDS
7.2.1 STREET INFRASTRUCTURE PLANS
A. Purpose and Intent: The Street Infrastructure Plans (in Appendix C) provide diagrams of the city's
street network and establishes the ideal alignment, hierarchy and design characteristics - including
total right-of-way width, sidewalk and streetscape amenities, parking lanes , travel lanes and other
geometric and urban design details - for all existing streets, proposed streets that have been adopted
as part of an Official Map, and new potential streets in the City of Beaufort.
B. Official Street Network Plan: Pursuant to the authority of S.C. Code 1976 § 6-7-1210 et seq. (1976), as
amended, the City has previously adopted several Official Maps. An Official Street Network Plan is
incorporated into this Code in order to represent a composite of these previously -adopted Official
Maps.
1. Purpose: This plan represents a composite of all Official Maps, to date, in the City. The map
designates existing or proposed streets or ways within the City that are targeted for creation,
expansion or other improvements. The Official Street Network Plan shall in itially consist of a
series of four (4) separate maps, included in Appendix C, which shall be deemed a part of the
Beaufort Code.
2. Modification: The Official Street Network Plan may be modified or supplemented per the
procedure for Text & Map Amendments (Section 9.16). In addition, the maps will be
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 5 of 43
automatically updated as additional Official Maps are approved per the appropriate process
required by state law.
C. Street Frontage Requirements: The street sections noted in Appendix C show specific street designs
for the purposes of identifying future improvements by both the city and fronting property owners.
These sections depict the ideal arrangement and design of street elements.
1. Applicability: For any project that is considered part of a Major Subdivision Site Plan, or requires
a Certificate of Appropriateness as a Major project type (Section 9.10.2 A.2.), and/or which
affects one whole block face, the fronting property owner shall install all prescribed streetscape
improvements as part of the development project. The installation of street frontage
improvements shall be a condition of final plat approval for major subdivisions, and Certificates
of Occupancy for Site Plans.
a. Exception: If similar elements as prescribed in the street section exist — e.g., on-street
parking, sidewalk, tree plantings — the requirement to install the streetscape element(s)
shall be waived if those items meet the intent of the prescribed street section, even if the
existing items do not meet the exact requirements of that street section. Example
Scenarios: If a street section prescribes a 5-foot sidewalk, but a 4-foot sidewalk already
exists, the existing sidewalk will satisfy the sidewalk requirement. However, if the street
section requires a 5-foot planting strip between the curb and the sidewalk, and the 4 -foot
sidewalk is directly adjacent to the curb, this would not satisfy the intent of the street
section and would need to be reconstructed per the prescribed standards.
2. Scope of Improvements: Street frontage improvements shall be installed along the entire
frontage of the property, to the centerline of the street, or if a multi-lane street, the affected
lane, at the sole cost of the applicant as directed by the Codes Administrator. The Codes
Administrator may permit modification of street improvement standards where the required
street improvements are not in the opinion of the Codes Administrator, roughly proportionate to
the impact, type, scale and cost of the proposed development action.
a. Street frontage improvements may include the following: curb, gutter, sidewalk, storm
drainage, street lighting, traffic signal equipment, utility installation. extension, or relocation,
landscaping strip, street trees and landscaping, irrigation, street widening, pavement overlay or
reconstruction, and channelization.
b. In addition to required frontage improvements, the applicant shall provide ramps from the
new sidewalk or walkway to the existing shoulder, across streets and pavement and
channelization tapering back to the existing pavement and channelization as requ ired to address
safety concerns.
D. Dedication of Right-of-Way:
1. Dedication of Right-of-Way. In the case of a street section adopted as part of an Official Map,
where the width of the existing right-of-way is insufficient to install the prescribed street
section, the fronting property owner shall be required to reserve the appropriate amount of
right-of-way (as measured from the centerline of the existing street). The future right-of-way
shall conform to all of the street network requirements of Section 7.2.2. Where a new right-of-
way that is not shown in the street regulating plan, is required as part of a new development, it
shall be designed with appropriate elements based on its proposed location and zoning district.
(See Appendix C).
a. In the case of a street section that is not part of an Official Map, where the width of the
existing right-of-way is insufficient to install the prescribed street section, the property
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 6 of 43
owner shall reserve the appropriate amount of right-of-way to complete the desired street
section. If the owner dedicates and installs the complete right-of-way, the cost of the
improvements may be compensated - see Section 7.2.1 E.
b. Where a future right-of-way is identified on an Official Map, and thus represented on the
Official Street Network Plan— these are indicated as "New Adopted Streets" — new
development shall reserve this area for the new street in the future. If access is ne eded to
the site in that location, the street shall be constructed in the general location shown.
c. Exceptions and Alternatives:
i. Where available right-of-way — due to existing structures and topographic conditions
limited to wetlands, specimen and landmark trees, — do not functionally permit the
full section to be constructed, the Administrator may adjust the required street
section.
E. Compensation: When a project is required to make off-site improvements within the existing right-of-
way, dedicate and/or improve a street with insufficient right-of-way, or install a new street (be it
public or private) per the requirements in Section C. above, compens ation may be available. To the
extent that the City has the authority and the ability, the Traffic Impact fee for the project shall be
reduced by the assessed value of the dedicated land and/or construction cost of the right -of-way
improvement. This may be done either as a direct reduction, rebate, or reimbursement of fees . (Ord.
No. O-14-23, 9-26-2023)
7.2.2 STREET NETWORK REQUIREMENTS
A. Continuation of Adjoining Street System: The proposed street layout shall be coordinated with the
street system of the surrounding area to form an interconnected street pattern, formalized by a
platted public access easement. Adequate street connectivity shall be assessed by the TRC, based on
the ability of the proposed alignments to:
1. Permit multiple routes between origin and destination points;
2. Diffuse traffic; and
3. Shorten walking distances.
B. Block Sizes: Blocks shall be compact so that they are comfortably walkable and appropriate for their
context.
1. In T3-S zones, block sizes are flexible, but the perimeter shall not exceed 2,640 linear feet (½
mile). An average block perimeter less than 2,000 feet is preferred.
2. In T3-N zones, block sizes are flexible, but the perimeter shall not exceed 1,700 linear feet (⅓
mile). An average block perimeter less than 1,500 feet is preferred.
3. In T4, T5 and RMX zones, blocks shall be no more than 400 feet on any side. An average block
length of 250—300 feet is preferred. The block perimeter shall not exceed 1,320 linear feet (¼ -
mile).
4. Exceptions may be made for natural elements such as wetlands, trees, topography, and cultural
resources, to be incorporated into the site design.
C. Street Stubs: New developments shall connect to any existing street stubs from adjacent properties
and stub to all adjacent properties.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 7 of 43
1. Exemptions: Street stubs shall not be required where the Planning Commission finds the
conditions listed below would prevent connections:
a. Topographical conditions (pre-development slopes of 18% or greater).
b. Environmental conditions (marshes, floodplains, specimen and landmark trees, etc.).
c. Property shape.
d. Property accessibility (existing platted subdivision with no stubs).
e. Incompatible adjacent land uses.
2. Location: Where multiple connection opportunities exist, street stub connections shall be
prioritized in the site design as follows:
a. Adjacent parcels 20 acres or greater in size.
b. Adjacent parcels that abut or are traversed by existing or proposed streets.
c. Where the Street Network Diagram recommends a street connection (indicated as a
proposed street).
3. Design:
a. Stub streets and streets intended for extension during future phases shall be constructed
to extend to the property line for constructability to adjoining property.
b. Stub streets shall not exceed 150 feet in length without a paved turnaround (permanent or
temporary).
c. Disclosure: The Final Subdivision Plat shall be recorded depicting that future connection is
required at any stub streets and streets intended for extension during future phases. A
clearly visible street sign shall be erected at the end of the stub street stating that the
street is planned to connect to a future street.
D. Cul-de-sacs and Dead-end Streets: Dead-end streets and cul-de-sacs are prohibited, except for only
the T-3 and LI zoning districts, where cul-de-sacs or other turn-arounds may be approved by the
Planning Commission. Compliance with the following standards must be met in all circumstances:
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 8 of 43
1. Permanent dead-end streets shall be no longer than 300 feet and shall be provided with a turn, -
around such as a cul-de-sac or close.
2. Temporary dead-end streets shall be provided with a temporary turnaround area which shall be
designed considering traffic usage, maintenance, and removal.
3. Alternative design solutions, such as a close (first preference), or a loop road cul -de-sac (second
preference) are preferable to a typical cul-de-sac.
4. Cul-de-sacs shall have a minimum right-of-way radius of 50 feet and minimum paved radius of 40
feet. When ample radii exist, cul-de-sacs shall contain a central planted median.
5. Whenever cul-de-sac roads are created, at least one pedestrian access easement shall be
provided, to the extent practicable, between each cul-de-sac head or road turnaround and the
sidewalk system of the closest adjacent road or pedestrian pathway. The access easement shall
be direct with a minimum width of 12 feet.
E. Gated Streets: New gated streets are prohibited.
1. Exceptions: They may be permitted, at the discretion of the Planning Commission, in T3 -S zoning
districts where connection to the existing street grid is not practicable due to topography or
existing surrounding conditions.
2. They may be permitted by the Planning Commission when the access proposed to be gated is an
alley or rear lane and is not the primary building frontage.
F. Street Naming and Renaming: Proposed Street names and number systems will be reviewed by the
administrator and the Beaufort County Emergency Management Department. No duplicate/similar
names are allowed, as determined by these agencies.
G. Reserved Strips Prohibited: Reserved strips at the terminus of a new street shall be prohibited.
7.2.3 LOT ACCESS STANDARDS
A. Applicability: Any development that requires an access point (rear alley/lane or driveway) for purposes
of ingress and/or egress shall be subject to the provisions of this section. All new accesses must be
approved by the appropriate permitting authority. Access points may not be installed on undeveloped
property less than 2 acres.
B. Maximum Number: For single-family and two- and three-family dwellings, only one driveway shall be
permitted per lot. In T3-S, circular driveways may be permitted on lots greater than 100 feet in width,
where no sidewalk exists. Driveways may only be installed when rear access is not possible or required.
For double frontage lots, one curb cut per street may be permitted. For all other building types, the
maximum number of driveways allowed for any property is outlined in the table below.
FRONTAGE
WIDTH
MAXIMUM PERMITTED DRIVEWAYS (CURB CUTS)
PER STREET FRONTAGE
up to 150 feet 1
150 feet or more 2 - Additional driveways (in excess of 2) shall be permitted only after the applicant
successfully demonstrates the necessity for such additional driveways, as determined by
the appropriate Design Review Body. Along arterial roads and thoroughfares, such
additional driveways shall be "right-in, right-out" driveways only.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 9 of 43
C. Location and Spacing:
1. Street Intersection: No curb or other access point shall be located closer than:
a. 20 feet from the intersecting point of the 2 street right-of-way property lines involved (or
such lines extended in case of a rounded corner);
b. 25 feet from the intersection of the 2 curb lines involved (or such lines extended in case of
a rounded corner), whichever is the least restrictive.
2. Spacing: All access points shall have a minimum separation from certain features as follows:
FEATURE MINIMUM SEPARATION1
Adjacent Property Line (does not apply to shared or
joint-use driveways)
0 ft
Another Curb Cut (driveway or street intersection) on
all roads except Major Thoroughfares
25 ft
Major Thoroughfares — defined as streets with the
Street Section designation of Major Thoroughfare, or
the Robert Smalls Parkway, Sea Island Parkway/Lady's
Island Drive, or Boundary Street Specific Street Section
— Another Curb Cut (driveway or street intersection)
Depends on Posted Speed Limit
< 35 mph 100 ft
35 mph 200 ft
40 mph 250 ft
45 mph2 300 ft
50 mph2 400 ft
55+ mph2 500 ft
1 Minimum separation is measured from centerline
2 On Robert Smalls Parkway (Hwy 170) west of Parris Island Gateway, a minimum of 500 ft. separation distance
is required
3. Corner Lots: Access points on corner lots shall be from the side (or secondary) street, unless a
shared curb cut on the main thoroughfare is existing or proposed.
4. Access to Lots from Major Thoroughfares: Driveways serving individual residential lots shall not
have direct access onto streets identified as Major Thoroughfares — as identified on the second
row of the chart in Section 7.2.3 C.2. — unless no alternative means of access, such as alleys or
parallel access roads, exists, and it is unreasonable or impractical to require an alternative means
of access.
5. Shared Access: See Section 5.7.7 C.
6. Rear Access Required/No Front Access: For lots developed in the transect zones of T-3N, T-4, T-5
UC, all new access points shall be from a rear alley and/or road, except for lots within the historic
district. Exemptions to allow front loaded access points where connection to the existing street
grid is not practicable due to topography or existing surrounding conditions shall be at discretion
of the Planning Commission with approval of major subdivisions, and the Codes Administrator for
individual lots.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 10 of 43
D. Size:
1. Alleys: Alley pavement width may be a maximum of 24 feet wide for two -way traffic and 16 feet
wide for one-way traffic. For more design standards, see Appendix C.
2. Driveways:
a. Driveways for single-family and 2- and 3-family uses may not exceed 12 feet wide, except in
T3-S district, where they may be a maximum of 20 feet wide.
b. Tandem Parking: Tandem parking is allowed in all zones for all residential uses if:
i. Both tandem parking spaces satisfy the parking requirement of one residential
unit; and
ii. Neither of the tandem parking spaces shall be for required accessible parking
spaces.
c. Driveways to other uses and parking areas shall not exceed 24 feet in width for 2 -way
drives or 12 feet in width for one-way drives, except those with turn lanes required by the
city or SCDOT.
E. Access to Lots from Alleys/Rear Lanes:
1. Specific to T3-N, T4, and T5 districts: Alleys/rear lanes shall be provided along the rear property
lines of lots as follows:
a. In new subdivisions greater than 1 acre, alleys shall be provided for newly created lots that
meet any of the following criteria:
i. The lots are part of a block face with an average lot width of 60 feet or less at
the building setback line (excluding lots on cul-de-sacs).
ii. The lots are arranged around a Common Open Space.
iii. The lots front a collector or arterial road, regardless of the average lot width.
iv. The lots are intended for multi-family dwellings and/or mixed-use buildings.
b. In infill situations, the same standards apply as specified above, but only for developments
that include 4 or more contiguous lots, where one lot is a corner lot. In the Historic District,
the standards apply only to the Beaufort Conservation District; the requirement may be
waived at the discretion of the Historic Review Board.
F. Specific to Commercial Developments and Subdivisions:
1. Out-parcels: Out-parcels for shopping, office, or industrial centers shall be limited to internal
access to the center, unless otherwise approved as part of a master development plan. All
driveways shall be paved from the road to the property line.
2. Abandoned Driveways: Abandoned driveways (i.e., curb cuts that are no longer used for
vehicular access and are physically blocked by structures) shall be closed, and the area shall be
restored to the typical cross section of the right-of-way.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 11 of 43
7.2.4 STREET DESIGN STANDARDS
A. Street Section Design: The elements and widths of all proposed streets shall be in conformity with the
appropriate street section designated in the Street Regulating Plan (Section 7.2.1 and Appendix C).
B. Traffic Control and Signs: The type and location of traffic control devices used on City streets must be
approved by City Staff, and traffic control on private Streets shall be included and approved as part of
the major subdivision or site plan. Traffic signals should be used where warranted, but alternate traffic
control such as roundabouts should be considered first. When it can be shown that a particular zoning
action, master plan, or development plan impacts the street system to a point that a traffic signal is
warranted according to Manual on Uniform Traffic Control Devices (MUTCD) and app roved by City
Staff, the developer shall be responsible for all or a portion of the signal installation.
C. Sidewalks/Multi-use Paths: Where required per the Street Section in Appendix C, all sidewalks or
multi-use paths must be constructed concurrently with the street, or, if the street is already
constructed, prior to acceptance of any improvements. Exceptions to, the requirement to in stall a
sidewalk may be granted by the Planning Commission if:
1. Alternative pedestrian paths/bikeways have been or will be provided outside of the normal right -
of-way.
2. There are unusual topographic, vegetative, or other natural conditions to the extent that strict
adherence to said requirements would be unreasonable and not consistent with the purposes
and goals of this Code.
D. Utility Easements: Utility easements which require a width of 8 feet or larger shall be located in rear
alleys or along the side or rear lot lines. Special permission to install utility easements in other locations
may be requested by the utility companies and is subject to approval by the appropriate Design Review
Body.
E. Special Consideration to Protected Resources and other Natural Features: Street layout and design
shall give additional consideration to preserving protected resources and enabling natural areas to be
protected or minimally disturbed. Where streets are built in areas that have protected resources or
natural features, all utilities shall be placed within the street right-of-way and under the street in order
to avoid additional destruction of the natural features.
7.2.5 STREET TREE PLANTING REQUIREMENTS
A. Planting Areas: Planting strips and tree wells shall be established in accordance with the width and
plantings designated in the appropriate Street Section of the Street Regulating Plan (7.2.1 and
Appendix C).
B. Location and Number: Street trees shall be planted in the location and per the spacing specified for the
corresponding street classification in Appendix C. However, in specific cases, where due to the location
of utilities or other site constraints exist, the Planning Commission may allow street trees to be planted
on private property adjacent to the right-of-way.
C. Tree Species: Overstory and understory trees as prescribed in this section reference Appendix A.2
(Recommended Trees and Shrubs).
D. Minimum Tree Size: At the time of planting, young trees should be 2.5 inch caliper, with the lower side
of the crown a minimum of 6 feet above grade to avoid hazards to pedestrians.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 12 of 43
7.3: STREET ENGINEERING STANDARDS
7.3.1 STREET DESIGN, CERTIFICATION, AND CONSTRUCTION SPECIFICATIONS
A. Design Drawings and Certification: Professional engineers, registered in the state, shall prepare plans,
profiles, cross sections, and specifications for all subdivision roads and streets. The engineers shall
certify roads/streets are built to comply with the approved plans and specificati ons. Cross sections
shall be developed every 100 feet at intersections and break points in grade. Cross sections shall show
the complete rights-of-way including travel lanes, shoulders, ditches, curb and gutter, and sid ewalks
and utility locations, as applicable.
B. Construction Specifications for Paved Streets: Street construction specifications for paved streets shall
be in compliance with the South Carolina Department of Transportation Standards.
7.3.2 TRAFFIC IMPACT ANALYSIS
A. Applicability: A "traffic impact analysis" (TIA) shall be required for any development that is shown — in
the most recent Institute of Transportation Engineers (ITE) Trip Generation Manual or any alternative ,
approved at the discretion of the Planning Commission or the TRC, or by the engineering department
— to generate more than 50 trips during the peak hour on the adjacent street(s).
1. A second phase, second subdivision, or addition that generates traffic beyond this threshold
when taken as a whole shall also require a TIA, even though that development does not qualify
on its own.
2. A use shall not be changed without conducting a new TIA if the new use would generate traffic
beyond the 50 trips during peak hour threshold above. The Planning Commission may waive this
requirement.
3. Exception: Development — except for Educational Facilities with greater than 100 students — on
lots included in the Boundary Street Master Plan, adopted on August 28, 2006, and lots in the
area bounded by Calhoun Street, Carteret Street, Bay Street, and Ribaut Road, and lots zoned
Limited Industrial (LI), shall not be subject to the requirements of this section.
B. Traffic Access Management Analysis: As part of the TIA process, the proposed development shall have
an "access analysis" undertaken by the administrator to ensure that sufficient access to all proposed
developments and subdivisions is achieved.
1. The standards in the South Carolina Department of Transportation's "Access and Roadside
Management Standards Manual" (a.k.a. ARMS Manual) shall serve as a guide for this analysis,
which shall include identification of the following:
a. Access improvements that the applicant must install at his or her expense, such as
deceleration lanes;
b. The location of any curb cuts based on, but not limited to, sight distances, existing roadway
infrastructure, opposing driveways locations, and shared access;
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 13 of 43
c. Requirements for adequate driveway design, including, but not limited to, turning radius
and stacking distance.
2. The access requirements approved by the Planning Commission or the TRC shall be incorporated
on development or subdivision plans prior to their approval.
3. If an applicant is required to provide site-related traffic improvements, the cost of implementing
such improvements shall be borne by the applicant, and no such costs shall be eligible for a credit
or offset from any transportation impact fees unless specifically permitted by the Development
Fee Procedures - Beaufort County Code of Ordinances, Chapter 82, Article VII or most recent
version.
C. Traffic Impact Analysis Plan Preparation:
1. The TIA shall be conducted by an engineer registered in South Carolina who is experienced in the
conduct of traffic analysis.
2. Prior to beginning the TIA, the applicant shall supply the city with the following:
a. A written narrative describing the proposed land use(s), size, and projected opening date of
the project and all subsequent phases.
b. A site location map showing surrounding development within a one-half mile of the
property under development consideration.
c. A proposed site plan or preliminary subdivision plat illustrating access to public or private
roads and connectivity to other contiguous developments.
3. Prior to beginning the TIA, the applicant shall receive, in writing, the parameters to be followed in
the study, including the directional split of driveway traffic, trip distribution, background traffic
growth rate, previously approved but not completed projects, and the intersections to be
analyzed, along with any associated turning movement counts that are available or discussed and
approved by the TRC.
4. To review the TIA, the Planning Commission and TRC will require current trip generation
information, available information on land use, travel patterns, and traffic conditions, and shall
consult with the SCDOT.
D. Plan Contents:
Background information Requirement
List of all nonexistent transportation improvements
assumed in the analysis
Required
Map of site location, description of the parcel,
general terrain features, and location within the
jurisdiction and region.
Required
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 14 of 43
Description of geographic scope/ limits of study
area.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed.
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Plan at an engineering scale of the existing and
proposed site uses.
Required
Description and map or diagram of nearby uses,
including parcel zoning.
Required
Description and map or diagram of existing
roadways.
Required
Description and map or diagram of programmed
improvements to roadways, intersections, and
other transportation facilities within the study
area.
Required
Analysis of Existing Conditions
Collected daily and peak hour of the generator
traffic volumes, tabulated and presented on
diagrams with counts provided in an appendix.
Required
Analyses for intersections and roadways identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for
each lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments, tabulated and
presented on diagrams, if facilities or routes exist.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed –
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 15 of 43
Incorporation of all Traffic Impact Analysis studies
and Trip Generation from approved developments
or vested unbuilt developments within mile radius
at time of proposal.
Required (submitted for any jurisdiction, including
the Town of Port Royal, and County of Beaufort)
Speed Study If requested by City
Crash history near site If requested by City
Sight distance If requested by City
Analysis of Future Conditions without Development
Description of and justification for the method and
assumptions used to forecast future traffic volumes.
Required
Analyses for intersections and roadways as identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for each
lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments tabulated and
presented on diagrams, if facilities or routes exist or
are planned.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed.
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Trip Generation
Site trip generation, with tabulated data, broken out
by analysis year for multi- phase developments, and
including justification for deviations from ITE rates, if
appropriate.
Required
Description and justification of internal capture
reductions for mixed use developments and pass-by
trip reductions, if appropriate, including table of
calculations used.
Required
1. Phased Developments: All phases of a development are subject to review, and all traffic plans for
the entire development shall be integrated with the overall traffic analysis. A TIA for a specific
phase of development shall be applicable to the phase of development under imme diate review.
However, each phase of development shall expand and provide detailed analysis at the
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 16 of 43
development plan stage beyond the estimates provided for at the concept plan or master plan
stage.
2. Infrastructure Analysis: The adequacy of the roads that the development will be accessed from
shall be assessed in the TIA. Recommendations for improvements shall be made. The relative
share of the capacity created shall be broken down as follows: development share, other
developments' share, any existing overcapacity, and capacity available for future growth.
3. Required Elements of the TIA:
a. A site plan or subdivision plat identifying accesses to and from existing or proposed streets
and intersections, along with all opposing intersections across adjacent streets.
b. Description of the proposed development, including the type and intensity of proposed
land use(s) including, but not limited to: the number of residential units by type, the
number of existing and proposed lots, the type of proposed nonresidential devel opment
and the amount of such development measured by gross floor area or other appropriate
unit of measurement, the general size and type of accessory development or facilities, and,
for nonresidential development, adequate information to identify the app ropriate land use
category for trip generation.
c. Projected vehicular trips to and from the completed development during a.m. and p.m.
peak hour — trip rates shall be taken from ITE Manual or alternatively, an applicant may
elect to perform, at his own expense, a "trip generation study" which may be submi tted as
part of the traffic impact analysis plan. Such trip generation study shall be subject to the
review and verification of the TRC and engineer. For proposed uses not specifically listed in
the ITE Manual, and for which a trip generation study has not been performed, the
designated engineer(s) shall determine the most appropriate trip generation rate. The TRC
shall make the determination of the appropriate trip generation rate, from whatever the
source. The percentage of pass-by trips, if used in the plan, shall be included, as well as the
source of this information.
d. A written narrative setting forth the assumptions upon which any projection was made in
developing the traffic impact analysis plan shall be included in the analysis. If the
assumptions are derived from the ITE Manual, the materials shall be referenced and
properly cited. If the assumptions are not from the ITE Manual, appropriate excerpts from
other reliable transportation planning resources shall be included in the study, and reasons
underlying the assumptions shall be stated in the narrative.
e. The TIA shall review access to the site. The adequacy of the entrance design shall be
evaluated, and recommendations made on acceleration and deceleration lanes, left -turn
lanes, or signalizations shall be part of the TIA. Educational facilities shall include pick -up
and drop-off plans and analysis of the impact on the surrounding streets and interse ctions.
f. The TIA shall review the number and types of curb cuts that are permitted. In particular,
the TIA shall assess the connection of the property to adjoining properties. Where the use,
scale of development, or size of adjoining properties is such that trip s would be anticipated
between the proposed use and the other properties, the TIA shall make recommendation
on interconnections. The TIA shall recommend interconnections to provide a smooth flow
of traffic between uses along arterials and collector roads to ensure that as much traffic as
possible uses secondary roads, rather than major roads, for short trips.
g. The TIA shall be based on intersection analysis procedures for signalized intersections as
identified in the most current edition transportation research board's highway capacity
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 17 of 43
manual, and/or the last update that analyses and emulates these procedures by means of
computer software, if available. The results of any required analysis/computer analysis
shall, at a minimum, indicate compliance or variance from the Traffic Goals (Sect ion 7.3.3
M).
h. The intersections that must be analyzed in the study are identified as:
i. Any intersection that serves as a development's point of access. This will
include intersections of public and/or private roads with major arterials, and
driveways offering direct access.
ii. The first major intersection as identified by the city engineer on both side of
the development's point of access.
iii. Other intersections on major arterials if development generates more than 50
a.m. or p.m. peak hour trips to that intersection, or if the intersection's level of
service or demand is significantly impacted by site related traffic.
iv. Unsignalized intersections and access drives — these shall be considered if
development impacts are anticipated. The plan must include the results of an
analysis of the operating conditions of critical intersections and/or all
intersections identified in the concept plan. The analysis shall reflect the
projected condition of these intersections and movements, based on the
scheduled opening date of the development. Other phases of the development,
if they can be reasonably determined, shall be considered as well.
E. Mitigation Plan Required: If the initial analysis indicates that the city's adopted Traffic Service Level
Goals (Section 7.3.2 M.) will not be met, a mitigation plan must be prepared, based on additional
analysis. The mitigation plan must show how the city's Traffic Service Level Goals are addressed as
mitigated. Applicants will be responsible for mitigating the traffic impacts at any intersection affected
by a proposed development.
1. If a traffic signal is recommended, the TIA shall provide information that:
a. Clearly indicates the need for a traffic signal.
b. Assesses the ability of other existing, planned, or proposed public roads to accommodate
the new traffic at a location other than the main highway in the vicinity of the proposed
development.
c. Describes in detail how a specific development will affect the study area transportation
system.
d. Provides documentation of appropriate South Carolina Manual of Uniform Traffic Control
Devices signal warrant satisfaction.
e. Gives design geometry of the private road that is consistent with that of public road
intersections, including curbs, appropriate lane widths, pavement markings, and vertical
alignment. Other roadway factors to be considered include, but are not limited to, speed,
type of highway, grades, sight distance, existing level of service, conflicting accesses, and
the effect of future traffic signal systems.
f. Provides an approach-throat length for the road to ensure the movement of vehicles
entering the site will not be impeded by conditions within the development and ensure
that all signal-spacing requirements are adequately met.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 18 of 43
2. The desirable spacing of signalized intersections on principal arterials is the SCDOT, county, or
city standards. The TRC may recommend to SCDOT the installation of a traffic signal at locations
where, using SCDOT standards, spacing is inappropriate due to topography, existing or proposed
road layout, documented accident history, unique physical constraints, existing or proposed land
use patterns, or requirements to achieve specific objectives for highway segment designations, as
shown in any locally adopted land use or transportation plan, approved city or county
transportation plan, or approved transportation policy.
3. Signal spacing concerns may be ameliorated in the following ways:
a. A proposed private road that may otherwise be considered for the installation of a traffic
signal may be replaced by an on-site route or a frontage road that directs traffic to or from
a nearby public road.
b. A private road that is being considered for traffic signal installation may be required to
connect to the existing or planned local road system to allow uses of surrounding
properties.
c. An existing or proposed intersection may be relocated.
d. A shared private road may be required to serve the needs of the multiple properties.
4. A traffic signal progression analysis is required if the proposed location is closer than the SCDOT
standards, given the presence of existing signals or the possible existence of identified future
signals proposed as part of a highway signal system. A traffic signal progression analysis for all
new, revised, or planned traffic signal systems on state highways shall be performed using
methods, models, computer software, data sources, roadway segment length, and assumptions
approved by the TRC. The roadway segment, analyzed to the extent possible, shall include all
traffic signals in the existing or future traffic signal system. The progression analysis shall:
a. Demonstrate acceptable existing and future traffic signal systems operation that may
include the morning peak, evening peak, midday period, and other appropriate time period
during any day of the week, adjusted for peak season, for cycle lengths and tra vel speeds
approved by the TRC.
b. Provide for a progressed traffic band speed no more than 5 mph (8 km/h) below the
existing posted speed for both directions of travel during the off-peak periods, nor more
than 10 mph (16 km/h) below the existing posted speed during peak periods. Approv al by
the TRC is required where speeds deviate more than the above.
c. Demonstrate that sufficient vehicle storage is available at all locations within the traffic
signal system without encroaching on the functional boundaries of adjacent lanes and
signalized intersections. The functional boundary of an intersection shall be determined in
discussion with the TRC, based on existing or projected conditions.
d. Provide a common cycle length with adequate pedestrian crossing times at all signalized
intersections.
e. Provide a progression bandwidth as large as that required, or as presently exists, for
through traffic on the federal or state highway at the most critical intersection within the
roadway segment. The most critical intersection is the intersection carry ing the highest
through volume per lane.
5. The traffic signal progression analysis shall be supplemented by a traffic engineering report that
also considers highway capacity and safety of the roadway segment under consideration. Traffic
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 19 of 43
volumes, intersection geometry, and lane balance, considered at all locations, shall be
appropriate for the present and identified future conditions, which are usually considered to
include the year of completion, and 5 years into the future.
F. Summary: A clear and concise summary of recommended improvements that can serve as an
executive summary is required.
G. TIA Review: The TRC shall review all TIAs as part of the applicable Design Review phase —. Final TIAs
shall be approved prior to the applicant submitting a Project Permit application (Section 9.5).
H. Application: A TIA shall be submitted to the TRC. Coordination with other entities in the county
government or South Carolina Department of Transportation (SCDOT) shall be the responsibility of the
city.
I. Completeness: The Planning Commission and/or TRC shall determine whether a TIA is complete.
Thorough and complete TIAs are the responsibility of the applicant. Failure by the applicant to provide
a complete TIA may result in review delays for their plat or plan.
J. Action on TIA: The TRC must first approve the TIA in regard to completeness and accuracy. Following
review of the required impact analysis plan, TRC shall recommend to the Planning Commission action
as follows:
1. Approval of the TIA as submitted;
2. Approval of the TIA with conditions or modifications as part of the development review and
approval process. An acceptable TIA with traffic mitigation measures may include the reduction
of the density or intensity of the proposed development, phasing of th e proposed development
to coincide with state and/or county-programmed transportation improvements, applicant-
provided transportation improvements, fees in lieu of construction, or any other reasonable
measures to ensure that the adopted traffic service-level goals are met. If mitigation is required,
it shall be required as a condition of any approval from the city.
K. Timing of Implementation: If a traffic mitigation program is part of an approved TIA, the developer
may be required to place a performance bond on all traffic mitigation improvements required as a
result of his project. This requirement may arise if the timing of the improvements needs to be
synchronized with other scheduled improvements anticipated for the area.
L. Responsibility for Costs of Improvements: The costs of implementation of an approved mitigation
program shall be the responsibility of the applicant. No certificates of zoning compliance or building
permits shall be issued unless provisions of the TIA are met.
M. Traffic Service Level Goals: The average stop time delay in seconds per vehicle for each intersection
determined to be critical to the TIA for the proposed development shall be compared to the city's
traffic service level goal of "D" for the average delay for all vehicles at any sign alized intersection during
the a.m. and p.m. peak hours.
7.4: COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE
7.4.1 PURPOSE AND INTENT
A. Intent: Community Green Space and Community Open Space is intended for the use and enjoyment of
a development's residents, employees, or users. These spaces serve to preserve natural areas, ensure
access to open areas and recreation, reduce the heat island effect, enhance stormwater quality, and
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 20 of 43
provide community health benefits. Community Green Space and Community Open Spaces are not, by
definition, required to be deeded or to be granted via easement to any public entity or municipality.
See Section 7.4.5 for ownership information.
B. Purpose: The purpose of this section is to provide a set of Community Green Space and Community
Open Space types and their associated standards to use within all districts. Community Green Space
and Community Open Space types in this section are distinct from those areas that are environmentally
sensitive and must be otherwise protected as regulated through Article 8 (Environmental Protection) .
C. Applicability: See Section 7.1.2.
D. Community Green Space Definition: an area of grass, trees, parks, trails or multi-use pathways, or
other vegetation set apart for recreational or aesthetic purposes within a development. It can be
privately or publicly owned.
E. Community Open Space Definition: Open space is land or water that is undeveloped and not used for
residential, commercial, industrial, or institutional purposes. It can be privately or publicly owned, and
can include areas like forests, farms, parks, and coastal lands.
7.4.2 COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE REQUIREMENT
A. Minimum Requirements: Development in all districts shall preserve the minimum amounts of
Community Green Space and Open Space as identified below (see following page):
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 21 of 43
B. Areas to be Included in Community Green Space and Community Open Space Calculations: The features and areas identified in Section 7.4.3 shall
be credited towards the open space requirements for the purposes of complying with this article.
C. Areas not to be Included in Community Green Space and Community Open Space Calculations: The following areas shall not be counted toward
open space requirements:
1. Private yards which are not subject to an open space or conservation easement.
2. Public road rights-of-way or private street easements, including sidewalks located within those rights -of-way or easements.
3. Open parking areas and driveways for dwellings.
4. Land covered by structures not designated for active recreational uses.
5. Designated outdoor storage areas.
OPEN/CIVIC SPACE REQUIREMENT
SIZE T1 T3-S T3-N T4-HN T4-N T5-DC T5-UC RMX IC LI MHP 1
Less than 3
acres See footnote (3)
3 acres—
10 acres 50% 20% 15% exempt 10% exempt 10% 10% 15% exempt
10 acres—15
acres 50% 20% 15% exempt 10% exempt 10% 15% 20% exempt 10%
15 acres—40
acres 50% 20% 15% n/a 15% exempt 15% 20% 20% exempt 10%
Greater
than
40 acres
50% 25% 20% n/a 20% exempt 20% 25% 25% exempt 10%
1 Each Manufactured Home Park shall have a minimum total area of 2,500 square feet set aside for common recreational open space , or at least 100
square feet of space for each mobile home lot, whichever is greater.
2 Specific to TND Overlay Projects: The open space requirement may be calculated comprehensively or by specific Transect zones. The requirements of
2.8.3.G.2.c must be met in addition to the requirements of this table.
3 For properties less than 3 acres, community green space and community open space shall be at the discretion of the approving authority (i.e.) Codes
Administrator or Planning Commission.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 22 of 43
7.4.3 COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE TYPES
The majority of Community Green Space and Community Open Space shall conform to one of the 8 types in the table below. If 75% or more of the types listed
below are utilized for required open space, a 20% increase in number of dwelling units is permitted.
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Regional
Park/Natural
Preserve
A natural preserve that is
available for unstructured
recreation. It may contain
small civic buildings and
areas of structured activity,
but is primarily left natural.
These areas may include
forests as well as wetlands
and regional retention areas
if they are treated as
amenities (e.g. Port Royal's
Cypress Wetlands).
T1 Regional
Min: 200 acres*
Max: None
*Natural
preserves with
no structured
activity have no
minimum size.
Frontage:
Independent
Disposition:
Natural, formal
or informal
Passive and active
recreation, drinking
fountains,
Community facility <
7,500 gross square
feet, paths and trails
Sport Complex
An open space that
consolidates heavily
programmed athletic fields
and associated facilities.
T1, IC, RMX Regional
Min: 25 acres
Max: None
Frontage:
Independent
Disposition:
Formal or
informal
Passive and active
recreation, drinking
fountains, community
facility < 7,500 gross
square feet, paths
and trails
Community
Park
An open space that is
available for unstructured
recreation and a limited
amount of structured
recreation. It may contain a
limited amount of athletic
fields.
T3, T4, T5,
RMX, IC
Multiple
Neighborhoods
Min: 8 acres
Max: None
Frontage:
Independent
Disposition:
Informal
Passive and active
recreation, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 23 of 43
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Greenway
A linear open space that may
follow natural corridors, a
greenway provides
unstructured and limited
amounts of structured
recreation.
T1, T3, T4,
T5, RMX, IC
Multiple
Neighborhoods
Min: 8 acres or 1
mile
Max: None
Frontage:
Independent or
building
Disposition:
Natural or
informal
Passive and active
recreation, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Square/Green
An open space that is
available for civic purposes,
unstructured, and limited
amounts of structured
recreation. It can be located
along waterfronts.
T3, T4, T5,
RMX, IC
Neighborhood
Min: 0.5 acres
Max: 5 acres
Frontage:
Building
Disposition:
Formal
Passive and active
(unstructured or
structured)
recreation, accessory
structure, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Plaza
A formal open space
available for civic purposes
and commercial activities, a
plaza is typically hardscaped
and can be located along
waterfronts.
T4, T5, RMX,
IC
Neighborhood
Min: 0.5 acres
Max: 2.5 acres
Frontage:
Building
Disposition:
Formal
Passive recreation,
accessory structure,
drinking fountains,
paths and trails
Pocket
Park/Pocket
Plaza
An open space that is
available for informal
activities in close proximity
to neighborhood residences.
Pocket plazas are usually
paved.
T3, T4, T5,
IC, RMX
Neighborhood
Min: 4,000
square feet
Max: 0.5 acre
Frontage:
Building
Disposition:
Formal or
informal
Passive recreation,
accessory structure,
drinking fountains,
paths and trails
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 24 of 43
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Playground
An open space designed and
equipped for the recreation
of children. A playground
may be fenced and may
include an open shelter.
Playgrounds may be included
within other civic spaces.
T3, T4, T5,
IC, RMX
Neighborhood
Min: None
Max: None
Frontage:
Independent or
building
Disposition:
Formal or
informal
Accessory structure,
drinking fountains,
paths and trails
Notes:
1. The illustration and description of each civic space type is illustrative in nature and not regulatory.
2. The Permitted Districts may be modified per a plan if the project is utilizing the Traditional Neighborhood Development Floating Overlay District
(Section 2.8.3).
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 25 of 43
The following provisions apply to the eight (8) Community Green Space and Community Open Space Types listed in
the table:
A. Playgrounds and Community Gardens: These may be incorporated into any of the other Community
Green Space and Community Open Space types - except Natural Preserve - or may stand alone.
B. Waterfront: When Community Green Space and Community Open Space is required, per Section 7.4.2,
developments that contain waterfront access should include some type of common access to at least
25% of the waterfront. This counts towards the Community Green Space and Community Open Space
requirement. When open space is required, for every 10% of the waterfront that is allocated for public
access, a 5% increase in number of dwelling units shall be permitted, up to a maximum of a 20%
increase.
C. Illustrative Standards: The columns titled "Diagram," "Description," and "Typical Facilities" of the table
of Community Green Space and Community Open Space Types are illustrative only.
D. Regulatory Standards: The following elements shall be regulatory:
1. Service Area: Describes how the space relates to the city as a whole and the area that will be
served by the Community Green Space and Community Open Space.
2. Size: The permitted size for each Community Green Space and Community Open Space.
3. Frontage: The relationship along property lines of a Community Green Space and Community
Open Space to adjacent buildings or lots.
a. Building: Community Green Space and Community Open Spaces that are listed as having a
"building" frontage shall have the fronts of buildings, either attached to the park or across
a street, facing onto the space for a minimum of 75% of the perimeter.
b. Independent: Community Green Space and Community Open Spaces that are listed as
having an "independent" frontage shall have the fronts of buildings, either attached to the
park or across a street, facing onto the space to the maximum extent possible, but may
have the side or rear of a building or lot front onto the space. The side or rear of a building
or lot fronting onto the Community Green Space and Community Open Space shall be
designed with a secondary frontage and entrance along the space.
4. Disposition: The character of the design of the Community Green Space and Community Open
Space.
a. Natural: Civic spaces with natural character are designed in a natural manner with no
formal arrangement of elements.
b. Formal: Civic spaces with a formal character have a more rigid layout that follows
geometric forms and have trees and other elements arranged in formal patterns.
c. Informal: Civic spaces with an informal character have a mix of formal and natural
characteristics.
5. Food Production: Community Gardens and other Community Green Space and Community Open
Spaces may be used to grow food. See Section 8.4.3 for specifications and requirements.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 26 of 43
7.4.4 DESIGN OF COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACES
A. Design Standards for Community Green Space and Community Open Space: Land used as Community
Green Space and Open Space shall meet the following design standards:
1. Location:
a. Where relevant and appropriate, the land shall be located so as to be readily accessible and
usable by residents and users of the development. To the maximum extent practicable, a
portion of the open space shall provide focal points for the development.
b. Common space set aside for children's play areas and other recreational activities shall be
clearly visible from the dwelling units on the site.
c. The land shall, to the maximum extent practicable, be located to adjoin, extend, and
enlarge any open areas, trails, parks, or other open space resources that exist or are
planned within or adjacent to the development.
2. Provision in Multi-Phase Developments: In multi-phase developments, open space Manuals may
be calculated either by phases, or by collectively looking at the development as a whole.
B. Accessory Structure Standards: All accessory structures within parks and open spaces — including, but
not limited to, restrooms, open-air pavilions, gazebos, picnic shelters, and outdoor theaters — shall not
be subject to the physical requirements of the building form or siting standar ds in Article 2 (Map and
Districts). They shall be designed to be consistent with the character of the district in which they are
located. Such consistency may require accessory structures to maintain building setbacks, frontage,
massing, disposition, and character similar to adjacent development as determined by the
administrator.
7.4.5 OWNERSHIP AND MAINTENANCE OF COMMUNITY GREEN SPACE AND COMMUNITY
OPEN SPACE
A. Open space areas or other community facilities shall be preserved and maintained in accordance with
the approved:
1. Development Design, in accordance with Section 9.8;
2. ZBOA Special Exception, in accordance with Section 9.13; or
3. Subdivision, in accordance with Section 9.9, whichever is appropriate.
B. Provision must be made by the property owner to ensure preservation and long term maintenance and
management of Community Green Space and Community Open Spaces through one of the following
mechanisms:
1. Conveyance of the land to a property owners' or homeowners' association that holds the land in
common ownership and will be responsible for managing and maintaining it for its intended
purposes.
2. Conveyance of the land to a third-party beneficiary, such as a nonprofit environmental or civic
organization, that is organized for, capable of, and willing to accept responsibility for managing
and maintaining the land for its intended purpose.
3. Dedication of the land to the city or other appropriate public agency that is organized for,
capable of, and willing to accept responsibility for managing and maintaining the land for its
intended purposes.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 27 of 43
C. All methods utilizing private ownership shall require deed restrictions, covenants, or other legal
instruments that ensure continued use of the land and facilities for their intended uses, and provide for
the continued and effective management, operation, and maintenance of the land and facilities.
D. Failure to maintain Community Green Space and Community Open Space areas or other community
facilities shall be a violation of this Code subject to the remedies and penalties in Article 12 (Violations
and Enforcement).
E. If the owner of a Community Green Space and/or Community Open Space fails to maintain it in
reasonable condition, and in accordance with approved plans, and fails to correct deficiencies cited by
the city, the city shall have the authority to correct the deficiencies per the City's Code of Ordinances at
the owners expense.).
7.5: SUBDIVISION AND SITE PLAN STANDARDS
7.5.1 GENERAL PROVISIONS
The provisions of this Section shall apply to any and all subdivision of land , or site plan within the municipal
boundaries of the City, unless expressly and specifically exempted or provided otherwise in this Code. No
development shall be undertaken without prior approval or authorization pursuant to the terms of this Code.
All development shall comply with the applicable terms, conditions, requirements, standards and procedures
established in this Section and the Code. The submittal of an application for approval pursuant to the
provisions of these Subdivision Regulations constitutes consent to, and agreement to comply with, all of its
applicable provisions.
This Section establishes procedural and substantive rules for obtaining the necessary approval to develop
land and construct buildings and structures. Development applications will be reviewed for compliance with
the City’s Comprehensive Plan, Civic Master Plan, Beaufort Preservation Manual, and this Code.
Scheduling of the review of development applications before Staff, TRC, the Planning Commission or City
Council is at the discretion of the City. Any change to a development application by an Applicant after formal
submittal of that application to the City constitutes a decision by the Applicant that may result in the City
deciding to vacate the Hearing and/or void the pending application. The City may then reschedule or cancel
the review of the development application at its discretion.
Prior to formal submittal of any subdivision application identified in this Section, the Planning Department
will typically provide to an applicant an individualized submittal checklist indicating the documents and
information needed, quantities of those documents to be submitted, and the referral agencies that will be
involved in the review process. The applicants are responsible for being fully familiar with all applicable
provisions of these Subdivision Regulations. Upon determination by staff that a sub mittal constitutes a
complete development application, the City will forward the packets to each referral agency.
7.5.2 SUBDIVISION TYPES AND PROCESS OUTLINES
Methods of land subdivision. There are two ways to subdivide land based on the magnitude of scale: Minor
Subdivision and Major Subdivision.
A. Minor Subdivisions.
Definition. A Minor Subdivision is a subdivision, or amendment to a subdivision, which has been
previously platted, includes no additional public right-of-way dedication, and includes one or more of the
following:
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 28 of 43
1. The boundaries of five or fewer lots are created from one parent tract or lot, no further subdivisions
shall be allowed from any lot created or the parent tract;
2. Any lot line adjustment;
3. A consolidation of multiple lots into one when a new street or street change is not involved.
B. Major Subdivisions.
Definition. A Major Subdivision is a subdivision which includes one or more of the following:
1. Dedication of public right-of-way, public infrastructure or other public tracts, or a private road; or
2. The subdivision consists of six or more lots or tracts.
3. The creation of lots on property that has never previously been platted.
7.5.3 SKETCH PLAN
A. Sketch Plan purpose. The Sketch Plan is a conceptual design of the development submitted with a major
subdivision application, that depicts what the applicant envisions for the overall development, including
zoning, transportation, pedestrian network, parks, tree canopy, open space, and other amenities. The
purpose is to allow the Applicant, the Planning Commission, and the Community the opportunity to
discuss the conceptual subdivision before it goes through the major subdivision platting process.
B. Requirements. A Sketch Plan shall be submitted and provided to staff in advance of any public and/or
community meeting for all major subdivisions. Major proposed changes to any approved preliminary
plat(s) may require a new Sketch Plan approval if the Code Administrator determines the changes are
significantly different from the sketch plan discussed at the public meeting.
The Sketch Plan shall consist of the following elements:
1. Road plan: The applicant shall provide a preliminary traffic plan that addresses the following
elements:
a. The proposed street network and connectivity to the existing road network, including all
proposed access points.
b. The location and layout of all arterial and collector roads within the development.
c. A current preliminary traffic impact study prepared by a licensed traffic engineer which
evaluates proposed access points, the existing street system, and any need for any road
improvements (including off-site improvements) created by the proposed development.
2. Open space plan: The applicant shall provide a preliminary open space plan that depicts compliance
with Section 7.4 of this code, with the following elements:
a. Proposed open space distribution and location, including percentage of open space.
b. Compliance with 7.4.2 Community Green Space and Community Open Space Requirement .
c. Required buffer areas as per Section 5.5.1.
d. Wetland areas and setbacks as determined by SCDES-BCM, if applicable.
e. Proposed park locations, acreage, and types of parks as per Section 7.4.
3. Pedestrian network:
a. Location of all trails within development, and connection to existing trail network.
b. Connectivity of sidewalks to the existing pedestrian system, including any off -site sidewalk
improvements. This includes planning for a one-quarter mile pedestrian shed.
c. Depiction of any bike lanes or any other multi-modal features.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 29 of 43
4. Zoning/Design:
a. The location of zoning boundaries shall be provided with the application and depicted on the
Sketch Plan.
b. The plan should show how the zoning is harmonious with the surrounding area, and within
the property itself.
c. Conceptual building design and massing.
5. Overall utility plan:
a. A letter from the appropriate utility, confirming the existing capacity of the surrounding
utility system, and the future capacity of the utility system for the proposal. Utility plans for
the interior of the development (such as water and sewer service lines) are not required as
part of this process.
b. Proposed connections to the existing utility system.
C. Sketch Plan application submittal. The applicant shall submit a complete Sketch Plan application package
to the City. The application package shall include the following items:
1. Development application form, fee.
2. Title commitment. The title commitment must be dated no more than 90 days from the date of
Sketch Plan application submittal.
3. Title of project.
4. North arrow, scale (not greater than one inch equals 200 feet) and date of preparation.
5. Vicinity map.
6. Legal description.
7. Acreage of property; acreage in each zoning district; acreage in parks; acreage in open space.
8. USGS topographic contours.
9. Location and approximate acreage of proposed land uses.
10. Existing easements and rights-of-way on or adjacent to the property
11. Existing streets on or adjacent to the property (show and label street name).
12. Note or table indicating how public dedication requirements will be met.
13. Table providing the following information for each proposed land use area: total acreage; proposed
density proposed number of dwelling units and/or commercial buildings.
14. Location and acreage of proposed open space and parks as per Section 7.4., trails, regional trail
connections, playgrounds, schools or other public uses.
15. Proposed street system depicting the location and layout of all arterial and collector roads within
the development.
16. A preliminary traffic study prepared by a licensed traffic engineer which evaluates proposed access
points, the existing street system, and any need for any road improvements (including off -site
improvements) created by the proposed development.
17. Floodplain boundary with a note regarding the source of information (if a floodplain does not exist
on the property, this must be stated).
18. Zoning on adjoining properties.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 30 of 43
19. A letter from the appropriate utility, confirming the existing capacity of the surrounding utility
system, and the future capacity of the utility system for the proposal. Utility Plans for the interior
of the development (such as water and sewer service lines) are not required as part of this process.
20. Proposed connections to the existing utility system.
21. The location of any proposed or required lift stations.
22. Design rationale — description of how the development is integrated with surrounding area, how it
responds to site features/constraints and how it is consistent with this Code.
23. General description of plan for drainage and storm water management, including any regional
drainage solutions.
24. Description of how the proposed development complies with the City Comprehensive Plan.
25. Design: (i) Concept of lot impact study regarding structure location and massing design on typical
lots; (ii) Concept design representations of structures.
D. Application certification of completion. Within 30 days, staff shall either certify the application is
complete and in compliance with all submittal requirements or reject it as incomplete and notify the
applicant of any deficiencies. Applicant shall then correct any deficiencies in the applicat ion package and
re-submit the application to the City.
E. Sketch Plan Process.
1. Planning Commission Meeting. The Planning Commission shall hold a public meeting to review and
provide comments on the Sketch Plan.
2. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting by regular mail to neighboring property owners within 500 feet of the
property per this Code.
F. Sketch Plan review criteria. The Planning Commission shall use the following criteria in addition to other
applicable provisions of this Code to evaluate the applicant's application:
1. The land use mix within the project conforms to Beaufort's Zoning District Map and Comprehensive
Plan Preferred Land Use Map and furthers the goals and policies of the Comprehensive Plan.
2. The Sketch Plan represents a functional system of land use and is consistent with the rationale and
criteria set forth in this Chapter, the City’s Comprehensive Plan, and the Civic Master Plan as
amended.
3. The preliminary traffic, open space, park, utility, and pedestrian design is adequate and functional
given the existing and planned capacities of each system, and meets the standards found in this
Code.
4. The conceptual design and massing proposed is consistent with the requirements of the
Development Code.
G. Timeframe related to approval of Sketch Plan. After a period of 12 months has passed without submittal
of a Preliminary Plat application, the Codes Administrator may require an applicant to submit a new
Sketch Plan application for Planning Commission review.
H. Minor amendments. Minor amendments to the Sketch Plan may be approved administratively under the
following conditions:
1. Does not change any land use, or location of any land use.
2. Does not change the number of lots or density by more than ten percent.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 31 of 43
3. Does not contain significant changes in arterial or collector street alignment and/or access points,
or other major public elements such as drainage improvements, utility lines or facilities.
4. Does not change any measurable standard (other than above), such as open space, or park area, by
more than ten percent.
7.5.4 PRELIMINARY PLAT
A. Preliminary Plat purpose. The purpose of the preliminary plat is to provide the City with an overall plat
and the associated preliminary engineering for the proposed development.
B. Preliminary Plat application process.
1. Pre-application conference. A pre-application conference/TRC with the City is required before the
applicant may submit a preliminary plat application. Topics to be discussed will include:
a. The provisions of this Code and the applicable requirements;
b. The application and review process;
c. Submittal requirements; and
d. Changes or modifications based on direction from the Planning Commission at Sketch Plan
approval.
2. Preliminary Plat application submittal. Following review of the Sketch Plan, the applicant may
submit the complete preliminary plat application to the City. The preliminary plat application
package shall be formatted and packaged per the application submittal checklist provided by the
City and include the following items in both printed and electronic formats:
a. Development application form;
b. Application fee;
c. Title commitment. The title commitment must be current and dated no more than 120 days
from the date of preliminary plat application submittal; and
d. The preliminary plat that shall provide the following information:
i. Title of project.
ii. North arrow, scale (not greater than one inch equals 100 feet) and date of preparation.
iii. Vicinity map.
iv. Names and addresses of owners, applicant, engineers and surveyors.
v. Legal description.
vi. Total acreage of property.
vii. Existing contours at two-foot intervals (based on USGS datum).
viii. Name and location of abutting subdivisions or owners of abutting property (if land is not
platted)
ix. Lots, blocks, and street layout (with cross-sections), dimensions and square footage for
each lot. Dimensions and square footages may be rounded to the nearest whole
number.
x. Consecutive numbering of all lots and blocks.
xi. Existing and proposed easements (including rights-of-way) on and adjacent to the
property.
xii. Existing and proposed zoning on and adjacent to property.
xiii. Approximate location and size of existing sewer lines, water lines and fire hydrants.
Approximate location of proposed sewer lines, water lines, and fire hydrants with a
letter from BJWSA and the Fire Marshall.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 32 of 43
xiv. Location by field survey or aerial photography of existing and proposed water courses
and bodies of water such as irrigation ditches and lakes. Water courses shall include
direction of flow.
xv. Tree Survey and with Existing Tree Canopy Survey.
xvi. Floodplain boundary with a note regarding source of information (if a floodplain does
not exist on the property, state this on the plan).
xvii. The boundaries of proposed phases of the subdivision if the final plat is intended to be
submitted in multiple phases.
xviii. General location of existing surface improvements such as buildings, fences, or other
structures which will remain on the property as part of the subdivision.
xix. Location and acreage of proposed parks, trails, playgrounds, schools or other public
uses.
xx. Location, function, ownership and manner of maintenance of any private open space.
xxi. Land use table including land uses, approximate acreage of each land use type,
percentage of each land use type density (net and gross) and how public dedication
requirement will be met.
xxii. Total number of lots.
xxiii. Number of each type of dwelling unit proposed.
xxiv. An AutoCad drawing file of the Preliminary Plat in a format specified by the City
Engineer or Codes Administrator.
xxv. Surveyor's certificate.
xxvi. Traffic impact analysis (if applicable) as per the requirements found in
this development code.
3. Preliminary Plat drawing standards. The preliminary plat drawing shall comply with the following
standards:
a. The preliminary plat shall be prepared by or under the direct supervision of a registered land
surveyor, architect and/or engineer, shall be signed and stamped by said surveyor, architect
and/or engineer, and shall meet applicable State of South Carolina requirements.
b. Except for parcels separated by easements (including public rights -of-way), public tracts, or
railroads, parcels not contiguous with each other shall not be included in one plat, nor shall
more than one plat be made on the same sheet. Contiguous parcels owned by different parties
may be included on one plat, provided that all owners join in the dedication and
acknowledgment.
c. Lengths on the preliminary plat boundary shall be shown to the nearest hundredth of a foot and
bearings shall be shown in degrees, minutes and seconds.
d. Bearings, distances and curve data of all perimeter boundary lines shall be indicated outside the
boundary line, not inside, with the lot dimensions.
e. Names and signatures of all owners of equitable interest in the property shall be on the
preliminary plat and shall be made in black drawing ink.
4. Explanation of how the plat is consistent with this Code, the Comprehensive Plan, the Civic
Master Plan, and the Sketch Plan.
5. Preliminary grading and drainage plan and report. This plan and report must be certified by a
South Carolina registered professional engineer or Land Surveyor and include approximate
earthwork quantities (how earthwork on the site is "balanced"), storm drainage concepts such as
locations of pipe and other conveyance facilities, locations for on-site detention or downstream
structural improvements, and soil erosion and sedimentation control plans and specifications. It
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 33 of 43
must also discuss the impacts on and to any existing floodways and/or floodplains both on and
adjacent to the site as well as any FEMA applications or approvals that may be required.
6. Preliminary water and sewer plan and study. This plan shall be prepared by a registered
professional engineer. It is necessary that the engineer consult with the appropriate utility service
providers regarding the design of all utilities through the subdivision.
7. Preliminary landscape and open space plan. The landscape plan must address the treatment of all
exterior spaces. Landscape plans are to be designed to meet the requirements of this Code and
show approximate locations of trees, shrubs, groundcovers, turf, buffering, fences, walls and other
site amenities that will be included in the plan.
8. Traffic study. A TIA with requirements consistent with Section 7.3.2. This study must be prepared
by a professional traffic engineer and identify the projected impacts to the local and regional traffic
system. The direct roadway impacts and proposed share in the cost of regional improvements and
intersections must be identified for the project.
9. Archaeological Impact Assessment. An applicant may be required to provide the City as per Section
8.4 with a CHS records listing historically or archaeologically significant findings on the property
being subdivided at their expense.
10. General ecological resource survey. Prepared by a qualified biologist, geologist, ecologist, or
similar qualified professional, a survey identifying the potential/absence/habitat of a threatened or
endangered species and wetlands or other ecologically sensitive area. Said survey shall make
practical recommendations regarding treatment or mitigation of the findings.
11. Conceptual Design. Applicant should provide conceptual design and massing examples, (i.e. typical
building elevations, but not required for each individual lot, consistent with the requirements of
the Development Code.
C. Planning Commission Hearing. The Planning Commission shall hold a public hearing to approve, approve
with conditions or deny the Preliminary Plat.
1. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission hearing by regular mail to neighboring property owners within 500 feet of the
property per this Code.
2. Approval. The Planning Commission shall review and act on the Preliminary Plat. The Planning
Commission shall approve, approve with conditions, or deny the Preliminary Plat based on the
review criteria below.
D. Preliminary Plat review criteria. In addition to all provisions of this Code, the Planning Commission shall
use the following criteria to evaluate the applicant's request:
1. The Preliminary Plat represents a functional system of land use and is consistent with the
rationale and criteria set forth in this Code.
2. . The land use mix within the project conforms to the City’s Development Code and complies with
the Comprehensive Plan and Civic Master Plan.
3. . The utility and transportation design are adequate, given existing and planned capacities of those
systems.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 34 of 43
4. d. Lot layout, including structure location and design of each lot.
E. Phasing. The preliminary plat shall designate the boundaries of phases for which separate final plats will
be presented for approval. Each phase, either alone or in conjunction with previously approved and
recorded phases, must meet all of the requirements of this Code.
F. Early grading. After approval of a Preliminary Plat, Applicant may proceed with preliminary grading of
the project area if a construction plan set for grading and drainage is approved and memo authorizing
grading work is issued by the City Engineer or Codes Administrator. Early grading and storage of
construction related equipment is at the risk of the Applicant and no presumption of any Final Plat
approval at the Planning Commission is expressed or implied by any authorization of early grading.
G. Timeframe related to approval of Preliminary Plat. A preliminary plat is in full force and effect for a
period of two years from date of approval. Approval will automatically expire at the end of two years
unless an applicant formally requests an 18 month extension from the Planning Commission prior to
termination or submits a completed final plat application for all or a portion of the property.
7.5.5 FINAL PLAT
A. Final Plat purpose. The purpose of the final plat is to complete the subdivision of land consistent with
the technical standards of the City of Beaufort.
B. Final Plat application process.
1. Final Plat application submittal. The final plat application shall substantially conform to the
preliminary plat as approved at the public hearing and shall meet all conditions of approval. The
applicant shall submit the completed final plat application package to the City. The final plat
application shall be formatted and packaged per the application submittal checklist provided by the
City and include:
a. Development application form.
b. Application fee.
c. Title commitment. An updated title commitment, dated no more than 120 days from the date
of final plat application submittal.
2. Final Plat Standards. The final plat drawing shall comply with the following standards:
a. All requirements of Section 7.5.4.
b. The plat shall be prepared by or under the direct supervision of a registered land surveyor,
shall be signed and stamped by said surveyor, and shall meet applicable State of South
Carolina requirements.
c. Existing and proposed easements (including rights-of-way) in and adjacent to property (labeled
and dimensioned).
d. Existing and proposed street names for all streets on and adjacent to the property.
e. Final Traffic Impact Analysis (if applicable) as per the requirements found in the Development
Code.
f. If applicable, prior to commencement of construction; a State Highway utility permit from
SCDOT.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 35 of 43
g. If applicable, prior to commencement of construction, a State Highway access permit from
SCDOT.
h. If applicable, prior to commencement of construction, a construction dewatering permit from
DHEC
i. If applicable, prior to commencement of construction, a 404 Permit from the Army Corps of
Engineers.
j. Prior to commencement of construction, acceptable collateral in the amount and form
stipulated in Section 7.1.5.
3. Original plats. The applicant shall submit to the City, five original, signed copies of the final plat
ready to record, and final executed copies of all agreements.
4. Complete engineering plans and specifications. As a condition of Final Plat approval the applicant
shall prepare and submit the following:
a. Construction plans and profiles. The plans and profiles shall be prepared by a registered
professional engineer licensed in the State of South Carolina. Plans shall be 24 inches high by
36 inches wide and provide the following information:
b. The horizontal to vertical scales shall be chosen to best depict the aspects of the design.
c. Minimum horizontal scale: One inch equals 100 feet.
d. Minimum vertical scale: One inch equals ten feet.
e. The typical road geometric and structural cross-section is to be shown on each plan sheet.
f. The plan must show right-of-way lines and widths, road names, lot lines, tangent lengths and
bearings, curve radii, delta angles, curve lengths, chord lengths and bearings, stationing at all
beginning of curves and end of curves, intersections, structures, angles, curb lines, cross pans,
traffic control devices (islands, striping, signs, etc.), drive cuts, curb returns and radii, and all
other features to enable construction in accordance with approved standards and standard
engineering practice. Stationing may be centerline if approved by the City Engineer or Codes
Administrator. Construction plans shall include water lines and appurtenances, sewer lines and
appurtenances, and storm water lines and appurtenances and any other wet utilities .
g. The profiles shall include existing and proposed grade at curb and gutter or centerline of street
elevation at point of intersection of vertical curves, intersections, grade breaks, point of curb
return (PCR), point of reverse curve (PRC), and other critical points, structures, and all other
features.
h. Signature blocks for all utility providers unless otherwise provided in agreement form.
i. Structure details. Sufficient data shall be given to construction of major structures and road
appurtenances such as bridges, culverts, gutters, drives, walks, cross pans, etc; detail shall
include orientation line and grade, cross-sections, dimensions, reinforcement schedules,
materials, quality specification, etc., or as the City Engineer may approve.
j. Final Water Report. A final water report including hydraulic analysis and pipe sizing
calculations. Note, this report can be verified by BJWSA and does not need to be submitted to
the City.
k. Final Sanitary Sewer Report. A sanitary sewer report including hydraulic analysis and pipe
sizing calculations. Note, this report can be verified by BJWSA and does not need to be
submitted to the City.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 36 of 43
l. Sewage collection and water supply distribution plans, profiles and specifications. The plans,
profiles and specifications shall be prepared by a registered professional engineer and shall be
accompanied by written approvals from BJWSA.
m. Final drainage plans and reports. Based upon the approved preliminary drainage plan, a final
report is to be submitted in accordance with SOLOCO Drainage and Design Criteria, as
amended or as the City Engineer may approve. The plan and report must provide:
n. Erosion control plans, when required.
o. Sizing of all pipes, inlets, conveyance ways, and other appurtenances.
p. Final grading plan. The final grading plan shall be 24 inches high by 36 inches wide and
illustrate existing and proposed contours and lot and block grading details.
q. Soils report. The soils report shall detail pavement design and construction requirements and
shall be submitted after overlot grading is complete.
r. Final landscape and open space plan. The landscape plan must address the treatment of all
exterior spaces. Landscape plans are to be designed to meet the requirements of this Code and
show trees, shrubs, groundcovers, turf, buffering, fences, walls and oth er site amenities that
will be included in the plan. All plant materials must be adapted to the physical limitations of
the local climate and specific conditions of the landscape plan. All plant materials must meet
specifications of the American Association of Nurseryman for number one grade. All street
trees must be selected from the City of Beaufort recommended tree list.
s. Landscape Plan drawn to scale (not greater than one inch equals 50 feet) on 24 by 36 -inch
sheets which includes:
i. Project name.
ii. Scale, north arrow and date of preparation.
iii. Existing and proposed streets and street names.
iv. Lot lines, easements and public rights-of-way as shown on the subdivision plat, including
gross and net area of all parcels.
v. Location of proposed building footprints and parking areas.
vi. Location of storage, loading and service areas.
vii. Existing and proposed two-foot contours (based on USGS datum).
viii. Natural features, wetlands, wildlife corridors, floodplains, streams, ditches and other
waterways.
ix. The location of existing and proposed utilities. Utility lines can be 'ghosted' in on the
landscape plan to vary the line types for cleaner drawings.
x. All existing trees within the proposed site and adjacent to the site must be accurately
identified on the plan. Existing trees must be labeled as to their size, species and if they
are intended to remain, be removed or transplanted. All replacement mitigat ion trees
will need to be shown separately on the plan. Tree protection standards for existing
trees to remain shall be included on the plan.
xi. The extent and location of proposed trees, shrubs and perennials and quantities of each
species. Plant materials are to be drawn at two-thirds of their mature size.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 37 of 43
xii. Landscape schedule including the represented plant symbol, Latin name, common
name, planting size and number of individual plants. All plant materials are to meet the
minimum size requirements as provided in this Code.
xiii. Proposed treatment of all ground surfaces must be clearly indicated, including turf,
paving, mulch, native grass, seeded grass, etc. Grass areas are to be specified as seed or
sod, and a seed mix/rate specified.
xiv. Sight distance triangles must be shown at street intersections pursuant to this Code.
xv. Project specific landscape notes and details to ensure the proper planting,
establishment and survival of plant materials. Additional notes detailing the warranty
for plant materials and continued maintenance shall be included.
xvi. Open space and pedestrian circulation system.
xvii. Proposed grading of the project site, including drainage swales, detention basins,
retaining walls and any off-site infrastructure improvements.
xviii. Notes for conservation and retention of topsoil and landscape soil preparation.
xix. Restoration, revegetation or enhancement of disturbed natural areas or open space
feature.
xx. Park structures, signage, play equipment, and other landscape or park amenities and
appurtenances.
xxi. A "pdf" file and an AutoCad drawing file of the final plat in an electronic format
specified by the City Engineer.
xxii. Design standards as required in Site Plan section 7.5.7 B.4.
5. Post approval actions. Prior to issuance of a building or grading permit, the applicant shall submit
the following documentation to the City:
a. List of contractors. List of all contractors that will be performing the improvements.
b. Proof of insurance/business license. Proof of workman's comprehensive insurance and liability
insurance for each contractor and business license.
c. Open space deed restriction. Areas designated as open space shall be protected by a deed
restriction or other appropriate method to ensure that they cannot be subdivided or
developed in the future and will remain as open space until the use is modified by the City.
d. Construction traffic control plan. Applicant will develop a plan for City Engineer, Codes
Administrator or appointee, review that addresses construction traffic, construction water,
temporary road closures, street repairs, dust, noise and other construction -related concerns.
e. Other certificates, affidavits, enforcements or deductions as required by the City.
C. Approval. The City Codes Administrator shall review and act on the Final Plat. The Codes Administrator
may choose to approve, approve with conditions, or deny the Final Plat based on the criteria below.
1. Final Plat review criteria. In addition to all provisions of this Code, the Codes Administrator uses
the following criteria to evaluate the applicant's final plat application:
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 38 of 43
a. The Final Plat is in substantial conformance with the approved Preliminary Plat. For the
purposes of this Code, "substantial conformance", includes design adjustments made to meet
any conditions of preliminary plat approval, and is determined as follows:
b. Does not change any land use.
c. Does not contain changes which would render the final plat in nonconformance with
requirements of this Code.
d. Does not contain significant changes in street alignment and/or access points, or other public
elements such as drainage improvements, utility lines or facilities.
e. Does not increase density.
D. Timeframe related to approval of Final Plat. A final plat is in full force and effect for a period of two
years from date of recordation unless a longer timeframe is specifically allowed by the City in an
approved Development Agreement or unless public improvements are completed and accepted on all or
a portion of the final plat. Applicants may formally request one 18 month extension from the Codes
Administrator prior to termination of final plat approval. Prior to the expiration of the original two year
timeframe or the extension timeframe, an applicant may formally request an additional extension if
substantial progress has been made on installation of public improvements.
7.5.6 MINOR SUBDIVISION PLAT
A. Minor Subdivision Plat purpose.
1. The purpose of the Minor Subdivision Plat is a subdivision, or amendment to a subdivision, which
has been previously platted, includes no additional public right-of-way dedication, and includes one
or more of the following:
a. The boundaries of five or fewer lots are created from one parent tract or lot, cumulatively and
not more than 3 acres; (ex. any portion of a tract that is subdivided counts toward the five
total, and does not itself become a new parent tract to subdivide an additional five lots from)
b. Any lot line adjustment, consolidation of multiple lots into one.
B. Minor Subdivision plat application submittal. The applicant shall submit the complete Minor Subdivision
plat application package to the City. The application shall be formatted and packaged per the application
submittal checklist provided by the City and include:
1. Development application form.
2. Application fee.
3. Title commitment. A current title commitment, dated no more than 30 days from the date of minor
subdivision plat application submittal
C. Minor Subdivision plat standards. The plat drawing shall comply with the following standards:
1. The plat shall be prepared by or under the direct supervision of a registered land surveyor and
meet applicable State of South Carolina requirements.
2. Except for parcels separated by public rights-of-way, public tracts, or railroads, parcels not
contiguous shall not be included in one plat, nor shall more than one plat be made on the same
sheet. Contiguous parcels owned by different parties may be included on one plat, provided that all
owners join in the dedication and acknowledgment.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 39 of 43
3. Lengths shall be shown to the nearest hundredth of a foot and bearings shall be shown in degrees,
minutes and seconds.
4. Bearings, distances and curve data of all perimeter boundary lines shall be indicated outside the
boundary line, not inside, with the lot dimensions.
5. All signatures shall be made in black drawing ink.
6. Title of project.
7. North arrow, scale (not greater than one inch equals 100 feet) and date of preparation.
8. Vicinity map.
9. Legal description.
10. Basis for establishing bearing.
11. Names and addresses of owners, applicant, designers, engineers and surveyors.
12. Total acreage of subdivision.
13. Bearings, distances, chords, radii, central angles and tangent links for the perimeter and all lots,
blocks, rights-of-way and easements.
14. Lot and block numbers, numbered in consecutive order, and square footage or acreage to two
decimal places of each lot or tract.
15. Parcels excepted from inclusion noted as "not included in this subdivision" and the boundary
completely indicated by bearings and distances.
16. Existing rights-of-way in and adjacent to subject property (labeled and dimensioned).
17. Existing and proposed street names for all streets on and adjacent to the property.
18. Existing easements and their type in and adjacent to subject property (labeled and dimensioned).
19. Location and description of monuments:
i. Floodplain boundary with a note regarding source of information (if a floodplain does
not exist on the property, please state this on the plat).
20. Certificates blocks for signatures of owner, surveyor, utility providers, and City approval, as
applicable.
D. Record Minor Subdivision Plat. Five signed copies of the minor subdivision plat shall be delivered to the
City. The applicant will be responsible to record the minor subdivision plat with Beaufort County.
7.5.7 SITE PLAN
A. Site Plan Purpose. The site plan is a prerequisite to a building permit for all multi-family (excluding
duplexes), commercial, and industrial developments. The site plan shows how the lot will be developed
so that the City can ensure that the site design will be in compliance with the Development Code,
Comprehensive Plan and Civic Master Plan.
B. Site Plan Application. A Site Plan Application shall include the following:
1. Land use application form.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 40 of 43
2. Application fee and fee agreement.
3. Site Plan plat — The site plan shall be a minimum of 18 inches by 24 inches and shall provide the
following information:
a. Title of project.
b. North arrow, scale (no greater than one inch equals 50 feet) and date of preparation.
c. Vicinity map.
d. Address of project.
e. Legal description of property.
f. Name, address and phone number of property owner.
g. Name, address and phone number of person or firm responsible for plan.
h. Lot size (square footage).
i. Bearings and distances of all lot lines.
j. Existing and proposed easements and rights-of-way.
k. Existing and proposed paved areas and sidewalks on the site and in the adjacent rights -of-way, all
dimensioned, showing how pedestrians will have access to the site and buildings.
l. Gathering areas for people.
m. Existing and proposed curb cuts on the site and in the adjacent rights -of-way (on both sides of
perimeter streets), all dimensioned.
n. Existing and proposed two-foot contours.
o. Existing waterways on or adjacent to the site.
p. Finished floor elevations for all structures.
q. Footprint (including roof overhangs and eaves, decks, balconies, outside stairs and landings) of all
proposed structures and their use with their dimensions and locations noted with respect to the
property lines.
r. Existing structures and their use.
s. Square footage of the proposed building(s) and the footprint of the proposed building(s).
t. Proposed structure height.
u. For multi-family residential, the number of residential units and bedrooms per unit.
v. Location of proposed signs and lighting.
w. Specifications for the signs and lights, including type, height and general conformance to the
Code. For commercial and industrial uses, a photometric plan prepared by a qualified electrical
or lighting engineer shall be submitted that depicts all lighting fixtures and the light spread (in
footcandles) of these fixtures across the site to all property boundaries.
x. Proposed traffic controls and striping for parking areas (all lanes, driveways, and parking spaces
must be dimensioned).
y. Trash disposal areas and enclosures including specifications for enclosures.
z. Location and size of existing and proposed water and sewer service connections and tap sizes.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 41 of 43
aa. Location and size of water and sewer lines to which the service connections will be or are made.
bb. Location and size of water meter(s).
cc. Location and size of backflow-prevention devices.
dd. Indication of how and where perimeter drain will drain (if one exists).
ee. Location of existing electrical lines and poles on or adjacent to the site.
ff. Location of proposed electrical service connection and meter location.
gg. Location of electric transformer.
hh. Location of all fire hydrants. If none exist on site, note distance and direction of the closest
hydrant adjacent to the site within 500 feet.
ii. Location of detention/retention areas and storm sewer infrastructure with the required drainage
easements.
jj. The distance from the proposed building(s) or structure(s) to adjacent lot lines, easements, and
adjacent structures.
kk. A land use chart (table).
ll. Certificate blocks for signatures of owner, surveyor, utility providers, and City approval, as
applicable.
4. Design standards — Demonstrate in written or graphic form how the proposed structure(s) is
consistent with the design requirements of this code. Provide elevations of proposed
structures/graphic visual aids. Provide complete building elevations, drawn to scale, with
illustrations of all colors and identifying major materials and cut sheets to be used in the
structure(s). In addition, Staff may require building floor plans, sectional drawings, perspective
drawings, models, and/or computer visualizations when the impacts of a proposal warrant such
information.
5. Certified drainage report — A certified drainage report, including an erosion control study and
plan, as applicable, must be reviewed and approved by the appropriate sanitation district (if
applicable) prior to submittal of the report to the City as part of the site plan application.
6. Final landscape and open space plan — Provide an existing and proposed landscape plan with tree
protection zones and a tree survey, and open space plan consistent with Sections 5 and 7 within
this Code.
7. Traffic Impact Analysis — Provide TIA as per requirements of Section 7.3.2.
C. TRC and Staff Review. Staff and TRC reviews application and prepares comments. Staff and TRC will
review the site plan map to ensure it is consistent with the site plan review criteria. Following the review,
Staff will prepare a written report outlining any changes that the applicant must make before the site plan
can be recommended for public hearing with the Planning Commission. This report will be forwarded to
the applicant.
1. Applicant addresses staff comments. Applicant shall make all necessary changes to the site plan
and resubmit a revised copy to the City.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 42 of 43
D. Planning Commission Hearing.
1. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting by regular mail to neighboring property owners within 500 feet of the
property per this Code.
2. The Planning Commission shall hold a public hearing on the proposal. The applicant and other
property owners likely to be materially affected by the application shall be given an opportunity to
be heard.
3. At the conclusion of the public hearing, the Planning Commission may approve, deny, or approve
with conditions the application for a Major Development. No Major Development shall be
approved unless the following findings of fact are made:
a. The plan is consistent with the City of Beaufort Comprehensive Plan and Civic Master Plan.
b. The plan complies with all applicable requirements of this Code.
c. There exists adequate infrastructure (transportation and utilities) to support the plan as
proposed.
d. The plan conforms to the character of the neighborhood, considering the location, type and
height of buildings or structures and the type and extent of landscaping on the site.
E. Post approval actions.
1. Building Permit. A building permit shall be issued only when a site plan has been approved.
However, with the approval of the City, an applicant may submit a building permit application
concurrent with the site plan application. Building permits shall not be issued for any development
that is not in conformance with the approved site plan.
2. Phasing and expiration of approval. The site plan shall be effective for a period of three years from
the date of approval, unless stated otherwise in the written site plan approval. Building permits
shall not be issued based on site plans that have an approval date more than three years old. For
multi-phased plans, building permits shall not be issued based on an approval date more than three
years from the date of Phase I approval.
F. Appeals. See Chapters 7.6 and 9.17
G. Permit Validity. Upon the approval of the Major Development Design application, the applicant shall have
2 years to obtain a Project Permit. Failure to secure a permit for the permitted work within this time shall
render the compliance void. Any change to the approved plans that has not been authorized by the
Administrator shall invalidate the design approval, and any subsequent building permits.
H. Permit Extension. The Administrator may grant a one year extension of this time period upon submittal by
the applicant of sufficient justification for the extension. Extensions shall be submitted at least 1 month
prior to the expiration date.
I. Amendments to approved Site Plans.
1. Minor variations in the location of structures, improvements, or open space areas caused by
engineering or other unforeseen difficulties may be reviewed and approved by the City Staff. Such
changes shall not exceed ten percent of any measurable standard or modify the use, character, or
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 43 of 43
density of an approved site plan. All plans so modified shall be revised to show the authorized
changes and shall become a part of the permanent records of the City.
2. Changes to approved site plans that exceed the ten percent threshold, or other major
modifications (such as changes in building size or footprint, relocation of access points, changes to
required parking, etc.), shall be considered as a new site plan application. Such amendments shall
require Planning Commission review and approval to become effective. A complete site plan
application shall be prepared and submitted in compliance with the requirements set forth in this
Section.
7.6: APPEALS
See Chapter 9.17 for overall specifications regarding appeals.
PLANNING COMMISSION
February 10th, 2025
Code Amendment Packet
DEVELOPMENT CODE
Chapter 7 – Amendments
as of January 13 th, 2025
(with track changes only )
Beaufort, South Carolina, The Beaufort Development Code
7: LAND DEVELOPMENT
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 1 of 43
7: LAND DEVELOPMENT
7.1: IMPROVEMENT REQUIREMENTS
7.1.1 PURPOSE
The purpose of these land development requirements is to:
A. Encourage economically sound and environmentally sensitive development.
B. Assure the timely provision of required streets, utilities, and other facilities and services to new land
developments.
C. Assure the adequate provision of safe and convenient vehicular and pedestrian traffic access and
circulation in and through new land developments.
D. Assure the provision of needed open spaces and building sites in new land developments through the
dedication or reservation of land for recreational, educational, and other public purposes.
E. Assure, in general, the wise and timely development of new areas, in harmony with the Comprehensive
Plan of the city.
F. Encourage new subdivision developments that complement the City's historic development pattern.
G. Promote compact, well-defined, sustainable neighborhoods that enhance the City's character.
H. Create livable neighborhoods that foster a sense of community and reduce dependency on vehicles.
I. Encourage the proper arrangement of new streets in relation to existing or planned streets and
ensuring ensure streets facilitate safe, efficient, and pleasant walking, biking and driving.
7.1.2 APPLICABILITY
A. Unless noted otherwise in this section, all new development projects shall be required to have public
sewer and underground wiring, and shall comply with Section 7.2.3 (Lot Access Standards).
B. All development — with the exception of projects that qualify as Minor Development Design Review or
Minor Subdivision, or are located in the Historic District, and affect less than one whole block face —
are required to install or construct the improvements specified in the Table of Required Improvements
(Section 7.1.3).
C. The applicant shall be responsible for the installation and construction of required improvements
according to the provisions of this Code, except as may otherwise be specifically provided herein or by
city policy or agreement.
D. Approval of a Final Subdivision Plat shall be subject to the applicant having installed the improvements
designated in this article, or having guaranteed (Section 7.1.5), to the satisfaction of the city, the
installation of said improvement.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 2 of 43
7.1.3 TABLE OF REQUIRED IMPROVEMENTS
ZONING DISTRICT
REQUIRED
IMPROVEMENTS3
SECTION
REFERENCE
T1 T3-
S
T3-
N
T4-
HN
T4-
N
T5-
DC
T5-
UC
RMX IC LI MHP
Public Water and
Hydrants
7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Public Sewer 7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Paved Streets1 7.2.4 □ ■ ■ ■ ■ ■ ■ ■ ■
Streetscape2 Appendix C □ ■ ■ □ ■ ■ ■ ■ ■ ■ ■
Underground
Drainage
7.1.3.A □ ■ ■ ■ ■ ■ ■ ■ ■ ■ □
Curb and Gutter Appendix C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Sidewalks 7.2.4.C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Street Trees 7.2.5 □ □ ■ ■ ■ ■ ■ ■ ■ □ □
Street Lights n/a □ □ □ □ ■ ■ ■ ■ ■ ■ ■
Street Signs
(private streets)
n/a ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Underground
Wiring On-Site
7.1.3.C ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Community
Green Space and
Open Space
Space
7.4 □ ■ ■ □ ■ □ ■ ■ ■ □ □
■ required improvements by
district
□ may be required at the discretion of the Planning Commission
based on existing conditions, surrounding context, and street
section (Appendix C)
1 Rear lanes/alleys may be permitted to be paved with pervious material, such as gravel, depending
on the location.
2 Complete street requirements shall be coordinated with the specific street section found in the
regulating plan in Appendix C.
3 For Infill and Redevelopment, as defined in Section 8.3.2, these items [referring to the table of
required provisions} are required to the extent feasible based on existing conditions including roads,
utilities and adjacent buildings.
A. Street Improvements: Land designated for public streets shall be cleared and filled in accordance with
the latest edition of the "South Carolina Standard Specifications for Highway Construction", South
Carolina State Highway Department, or as determined appropriate by the adm inistrator. No land may
be disturbed until a Project Building Permit has been issued (Section 9.5). See Section 5.4 for Tree
Removal Standards. See Section 7.2 for more standards on street location. See Appendix C for Street
Regulating Plan and Design Standards.
B. Water and Sewer Facilities: Water and sewer facilities shall be provided in accordance with the
standard procedures and policies of the water and sewer provider and the South Carolina Department
of Environmental Services (SCDES) and shall be approved by the water and sewer provider.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 3 of 43
C. Utility lines: All utility lines within a development site shall be installed underground . The Planning
Commission may approve an exception only in cases where there are existing above-ground lines that
serve the property.
7.1.4 SURVEY AND ENGINEERING
A. Installation of Permanent Reference Points: Permanent reference points shall be placed in accordance
with the following requirements:
1. General Standards: Boundary surveys shall be performed, in accordance with the state minimum
standards published by the State Board of Registration for Professional Engineers and Land
Surveyors, unless more stringent requirements are specified. A minimum of two points in an y
survey must be tied to the state plane coordinate system. The survey may be done on the
horizontal ground distance and tied back to the state plane coordinates.
2. Control Monuments: Vertical control monuments shall be placed in or near the centerline of
pavement of subdivision streets at a minimum of 1 per 4 acres. Where practical, control
monuments shall be placed at points of curvature and points of tangency of curves. The control
monument may be poured on the job or be a concrete marker of the type commonly used in the
area: at least 3 feet long and tapered with a 12-inch long, ¼-inch diameter brass or bronze rod
embedded in the top. Control monuments shall be placed in a cast iron water main valve type
box with a cover flush with the pavement.
3. Property Marker: A steel or wrought iron pipe, rebar, or the equivalent, not less than 0.5 inches
in diameter and at least 24 inches in length shall be set at all property corners and points of
curves, except those located by monuments. They shall be flush with the ground .
4. Accuracy: Land surveys within the city limits shall be Class A surveys, set at an accuracy of at least
1:10000.
7.1.5 IMPROVEMENT GUARANTEES
A. Types Allowed: Prior to approval of a Final Subdivision Plat the applicant shall provide a performance
guarantee to ensure the completion of required improvements within a period of time as agreed upon
by the Administrator and the applicant, and expressed in the guarant ee. Such guarantee may be in the
form of a performance bond, a surety bond, a cash deposit, or a letter of credit. A performance
guarantee shall be posted in the amount of 125% of the total cost of improvements.
1. Performance/Surety Bonds and Letters of Credit: The performance or surety bond, or letter of
credit, shall be in a form acceptable to the city. It shall include a pledge by the bank, insurance
company or other bonding/lending institution that the funds necessary to carry out the terms of
the agreement are guaranteed for payment and will be released only upon receipt of written
instruction from the city.
2. Cash Deposits: If surety is in the form of a cash deposit with the City of Beaufort, proportional
parts thereof shall be refundable in relation to progress payments less retainage, subject to
approval of the city and subject to a minimum deposit balance of 25% of the project cost .
3. Maintenance Guarantees: If the applicant completes all required improvements and complies
with all conditions of the subdivision agreement as determined by the city, the remainder of
monies retained by a financial institution or by the city may be released to the applicant or hi s
successor in title. Prior to release, the applicant shall provide the city, prior to the issuance of any
building permit, a performance bond, a surety bond, or a cash deposit equal to the amount
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 4 of 43
determined by the city that would ensure the repair of any damage to the existing improvements
during the course of any construction, but in no case will the amount of the security be less than
$1,000.00 for each individual building lot. Prior to the issuance of any certificate of occupancy,
the city shall determine whether or not any breakage or damage has occurred. If no damage to
any off-site improvements has occurred, then the city may release the security to the applicant
or his successor in title. If damages have occurred, they shall be repaired, or the city may draw on
the security before it is released.
7.1.6 EASEMENT AND UTILITY STANDARDS
A. Multiple installations within easements: Easements shall be designed so as to provide efficient
installation of utilities. Public utility installations shall be located as to permit multiple installations
within the easements. The developer will establish final utility grades prior to utility installations.
Public utility easement dedication shall be required with any minor or major subdivision action.
B. Underground utilities: Telephone lines, electric lines, cable television lines and other like utility services
shall be placed underground. The applicant or developer shall be responsible for complying with the
requirements of this Section and shall make the necessary arrangements including any construction or
installation charges with each utility provider for the installation of such underground facilities.
Transformers, switching boxes, meter cabinets, pedestals, ducts and other facilities necessaril y
appurtenant to such underground utilities shall be placed underground or on the surface but not
on utility poles. Screening or fencing is required subject to approval of the City. Electric transmission
and distribution feeder lines and necessary appurtenances thereto may not be placed above ground
unless they are carrying greater than 115 kV. Upon approval of the City, such facilities shall be placed
within easements or rights-of-way provided for particular facilities.
7.2: STREET NETWORK AND DESIGN STANDARDS
7.2.1 STREET INFRASTRUCTURE PLANS
A. Purpose and Intent: The Street Infrastructure Plans (in Appendix C) provide diagrams of the city's
street network and establishes the ideal alignment, hierarchy and design characteristics - including
total right-of-way width, sidewalk and streetscape amenities, parking lanes , travel lanes and other
geometric and urban design details - for all existing streets, proposed streets that have been adopted
as part of an Official Map, and new potential streets in the City of Beaufort.
B. Official Street Network Plan: Pursuant to the authority of S.C. Code 1976 § 6-7-1210 et seq. (1976), as
amended, the City has previously adopted several Official Maps. An Official Street Network Plan is
incorporated into this Code in order to represent a composite of these previously -adopted Official
Maps.
1. Purpose: This plan represents a composite of all Official Maps, to date, in the City. The map
designates existing or proposed streets or ways within the City that are targeted for creation,
expansion or other improvements. The Official Street Network Plan shall in itially consist of a
series of four (4) separate maps, included in Appendix C, which shall be deemed a part of the
Beaufort Code.
2. Modification: The Official Street Network Plan may be modified or supplemented per the
procedure for Text & Map Amendments and Rezonings (Section 9.16). In addition, the maps will
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 5 of 43
be automatically updated as additional Official Maps are approved per the appropriate process
required by state law.
C. Street Frontage Requirements: The street sections noted in Appendix C show specific street designs
for the purposes of identifying future improvements by both the city and fronting property owners.
These sections depict the ideal arrangement and design of street elements.
1. Applicability: For any project that is considered part of a Major Subdivision )Site Plan, or requires
a Certificate of Appropriateness, as a Major project type (Section 9.10.2 A.2.), and/or which
affects one whole block face, the fronting property owner shall install all prescribed streetscape
improvements as part of the development project.. The installation of street frontage
improvements is required prior toshall be a condition of final plat approval for major
subdivisions, and certificates Certificates of occupancy Occupancy for Site Plans.
a. Exception: If similar elements as prescribed in the street section exist — e.g., on-street
parking, sidewalk, tree plantings — the requirement to install the streetscape element(s)
shall be waived if those items meet the intent of the prescribed street section, even if the
existing items do not meet the exact requirements of that street section. Example
Scenarios: If a street section prescribes a 5-foot sidewalk, but a 4-foot sidewalk already
exists, the existing sidewalk will satisfy the sidewalk requirement. Howeve r, if the street
section requires a 5-foot planting strip between the curb and the sidewalk, and the 4 -foot
sidewalk is directly adjacent to the curb, this would not satisfy the intent of the street
section and would need to be reconstructed per the prescribed standards.
2. Scope of Improvements: Street frontage improvements shall be installed along the entire
frontage of the property, to the centerline of the street, or if a multi-lane street, the affected
lane, at the sole cost of the applicant as directed by the Codes Administrator. The Codes
Administrator may permit modification of street improvement standards where the required
street improvements are not in the opinion of the Codes Administrator, roughly proportionate to
the impact, type, scale and cost of the proposed development action.
a. Street frontage improvements may include the following: curb, gutter, sidewalk, storm
drainage, street lighting, traffic signal equipment, utility installation. extension, or relocation,
landscaping strip, street trees and landscaping, irrigation, street widening, pavement overlay or
reconstruction, and channelization.
b. In addition to required frontage improvements, the applicant shall provide ramps from the
new sidewalk or walkway to the existing shoulder, across streets and pavement and
channelization tapering back to the existing pavement and channelization as requ ired to address
safety concerns.
D. Dedication of Right-of-Way:
1. Dedication of Right-of-Way. In the case of a street section adopted as part of an Official Map,
where the width of the existing right-of-way is insufficient to install the prescribed street
section, the fronting property owner shall be required to reserve the appropriate amount of
right-of-way (as measured from the centerline of the existing street). The future right-of-way
shall conform to all of the street network requirements of Section 7.2.2. Where a new right-of-
way that is not shown in the street regulating plan, is required as part of a new development, it
shall be designed with appropriate elements based on its proposed location and zoning district.
(See Appendix C).
a. In the case of a street section that is not part of an Official Map, where the width of the
existing right-of-way is insufficient to install the prescribed street section, the property
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 6 of 43
owner shall reserve the appropriate amount of right-of-way to complete the desired street
section. If the owner c dedicates and installs the complete right-of-way, the cost of the
improvements may be compensated - see Section 7.2.1 DE.
b. Where a future right-of-way is identified on an Official Map, and thus represented on the
Official Street Network Plan— these are indicated as "New Adopted Streets" — new
development shall reserve this area for the new street in the future. If access is ne eded to
the site in that location, the street shall be constructed in the general location shown.
c. Exceptions and Alternatives:
i. Where available right-of-way — due to existing structures and topographic conditions
limited to wetlands, specimen and landmark trees, — do not functionally permit the
full section to be constructed, the Administrator may adjust the required street
section.
E. Compensation: When a project is required to make off-site improvements within the existing right-of-
way, dedicate and/or improve a street with insufficient right-of-way, or install a new street (be it
public or private) per the requirements in Section C. above, compens ation may be available. To the
extent that the City has the authority and the ability, the Traffic Impact fee for the project shall be
reduced by the assessed value of the dedicated land and/or construction cost of the right -of-way
improvement. This may be done either as a direct reduction, rebate, or reimbursement of fees . (Ord.
No. O-14-23, 9-26-2023)
7.2.2 STREET NETWORK REQUIREMENTS
A. Continuation of Adjoining Street System: The proposed street layout shall be coordinated with the
street system of the surrounding area to form an interconnected street pattern, formalized by a
platted public access easement. Adequate street connectivity shall be assessed by the TRC, based on
the ability of the proposed alignments to:
1. Permit multiple routes between origin and destination points;
2. Diffuse traffic; and
3. Shorten walking distances.
B. Block Sizes: Blocks shall be compact so that they are comfortably walkable and appropriate for their
context.
1. In T3-S zones, block sizes are flexible, but the perimeter shall not exceed 2,640 linear feet (½
mile). An average block perimeter less than 2,000 feet is preferred.
2. In T3-N zones, block sizes are flexible, but the perimeter shall not exceed 1,700 linear feet (⅓
mile). An average block perimeter less than 1,500 feet is preferred.
3. In T4, and T5 and RMX zones , blocks shall be no more than 400 feet on any side. An average
block length of 250—300 feet is preferred. The block perimeter shall not exceed 1,320 linear feet
(¼-mile).
4. Exceptions may be made for natural elements such as wetlands, trees, topography, and cultural
resources, to be incorporated into the site design.
C. Street Stubs: New developments shall connect to any existing street stubs from adjacent properties
and stub to all adjacent properties.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/14/25
Chapter 7 – Land Development
Page 7 of 43
1. Exemptions: Street stubs shall not be required where the Planning Commission finds the
conditions listed below would prevent connections:
a. Topographical conditions (pre-development slopes of 18% or greater).
b. Environmental conditions (marshes, floodplains, specimen and landmark trees, etc.).
c. Property shape.
d. Property accessibility (existing platted subdivision with no stubs).
e. Incompatible adjacent land uses.
2. Location: Where multiple connection opportunities exist, street stub connections shall be
prioritized in the site design as follows:
a. Adjacent parcels 20 acres or greater in size.
b. Adjacent parcels that abut or are traversed by existing or proposed streets.
c. Where the Street Network Diagram recommends a street connection (indicated as a
proposed street).
3. Design:
a. Stub streets and streets intended for extension during future phases shall be constructed
to extend to the property line for constructability to adjoining property.
b. Stub streets shall not exceed 150 feet in length without a paved turnaround (permanent or
temporary).
c. Disclosure: The Final Subdivision Plat shall be recorded depicting that future connection is
required at any stub streets and streets intended for extension during future phases. A
clearly visible street sign shall be erected at the end of the stub street stating that the
street is planned to connect to a future street.
D. Cul-de-sacs and Dead-end Streets: Dead-end streets and cul-de-sacs are prohibited, except for only
the T-3 and LI zoning districts, where cul-de-sacs or other turn-arounds may be approved by the
Planning Commission. Compliance with the following standards must be met in all circumstances:
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/14/25
Chapter 7 – Land Development
Page 8 of 43
1. Permanent dead-end streets shall be no longer than 300 feet and shall be provided with a turn, -
around such as a cul-de-sac or close.
2. Temporary dead-end streets shall be provided with a temporary turnaround area which shall be
designed considering traffic usage, maintenance, and removal.
3. Alternative design solutions, such as a close (first preference), or a loop road cul -de-sac (second
preference) are preferable to a typical cul-de-sac.
4. Cul-de-sacs shall have a minimum right-of-way radius of 50 feet and minimum paved radius of 40
feet. When ample radii exist, cul-de-sacs shall contain a central planted median.
5. Whenever cul-de-sac roads are created, at least one pedestrian access easement shall be
provided, to the extent practicable, between each cul-de-sac head or road turnaround and the
sidewalk system of the closest adjacent road or pedestrian pathway. The access easement shall
be direct with a minimum width of 12 feet.
E. Gated Streets: New gated streets are prohibited.
1. Exceptions: they They may be permitted, at the discretion of the Planning Commission, in T3-S
zoning districts where connection to the existing street grid is not practicable due to topography
or existing surrounding conditions.
2. They may be permitted by the Planning Commission when the access proposed to be gated is an
alley or rear lane and is not the primary building frontage.
F. Street Naming and Renaming: Proposed Street names and number systems will be reviewed by the
administrator and the Beaufort County Emergency Management Department. No duplicate/similar
names are allowed, as determined by these agencies.
G. Reserved Strips Prohibited: Reserved strips at the terminus of a new street shall be prohibited.
7.2.3 LOT ACCESS STANDARDS
A. Applicability: Any development that requires an access point (rear alley/lane or driveway) for purposes
of ingress and/or egress shall be subject to the provisions of this section. All new accesses must be
approved by the appropriate permitting authority. Access points may not be installed on undeveloped
property less than 2 acres.
B. Maximum Number: For single-family and two- and three-family dwellings, only one driveway shall be
permitted per lot. In T3-S, circular driveways may be permitted on lots greater than 100 feet in width,
where no sidewalk exists. Driveways may only be installed when rear access is not possible or required.
For double frontage lots, one curb cut per street may be permitted. For all other building types, the
maximum number of driveways allowed for any property is outlined in the table below.
FRONTAGE
WIDTH
MAXIMUM PERMITTED DRIVEWAYS (CURB CUTS)
PER STREET FRONTAGE
up to 150 feet 1
150 feet or more 2 - Additional driveways (in excess of 2) shall be permitted only after the applicant
successfully demonstrates the necessity for such additional driveways, as determined by
the appropriate Design Review Body. Along arterial roads and thoroughfares, such
additional driveways shall be "right-in, right-out" driveways only.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 9 of 43
C. Location and Spacing:
1. Street Intersection: No curb or other access point shall be located closer than:
a. 20 feet from the intersecting point of the 2 street right-of-way property lines involved (or
such lines extended in case of a rounded corner);
b. 25 feet from the intersection of the 2 curb lines involved (or such lines extended in case of
a rounded corner), whichever is the least restrictive.
2. Spacing: All access points shall have a minimum separation from certain features as follows:
FEATURE MINIMUM SEPARATION1
Adjacent Property Line (does not apply to shared or
joint-use driveways)
0 ft
Another Curb Cut (driveway or street intersection) on
all roads except Major Thoroughfares
25 ft
Major Thoroughfares — defined as streets with the
Street Section designation of Major Thoroughfare, or
the Robert Smalls Parkway, Sea Island Parkway/Lady's
Island Drive, or Boundary Street Specific Street Section
— Another Curb Cut (driveway or street intersection)
Depends on Posted Speed Limit
< 35 mph 100 ft
35 mph 200 ft
40 mph 250 ft
45 mph2 300 ft
50 mph2 400 ft
55+ mph2 500 ft
1 Minimum separation is measured from centerline
2 On Robert Smalls Parkway (Hwy 170) west of Parris Island Gateway, a minimum of 500 ft. separation distance
is required
3. Corner Lots: Access points on corner lots shall be from the side (or secondary) street, unless a
shared curb cut on the main thoroughfare is existing or proposed.
4. Access to Lots from Major Thoroughfares: Driveways serving individual residential lots shall not
have direct access onto streets identified as Major Thoroughfares — as identified on the second
row of the chart in Section 7.2.3 C.2. — unless no alternative means of access, such as alleys or
parallel access roads, exists, and it is unreasonable or impractical to require an alternative means
of access.
5. Shared Access: See Section 5.7.7 C.
6. Rear Access Required/No Front Access: For lots developed in the transect zones of T-3N, T-4, T-5
UC, all new access points shall be from a rear alley and/or road, except for lots within the historic
district. Exemptions to allow front loaded access points where connection to the existing street
grid is not practicable due to topography or existing surrounding conditions shall be at discretion
of the Planning Commission with approval of major subdivisions, and the Codes Administrator for
individual lots.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 10 of 43
D. Size:
1. Alleys: Alley pavement width may be a maximum of 24 feet wide for two -way traffic and 16 feet
wide for one-way traffic. For more design standards, see Appendix C.
2. Driveways:
a. Driveways for single-family and 2- and 3-family uses may not exceed 12 feet wide, except in
T3-S district, where they may be a maximum of 20 feet wide.
b. Tandem Parking: Tandem parking is allowed in all zones for all residential uses if:
i. Both tandem parking spaces satisfy the parking requirement of one residential
unit; and
ii. Neither of the tandem parking spaces shall be for required accessible parking
spaces.
c. Driveways to other uses and parking areas shall not exceed 24 feet in width for 2 -way
drives or 12 feet in width for one-way drives, except those with turn lanes required by the
city or SCDOT.
E. Access to Lots from Alleys/Rear Lanes:
1. Specific to T3-N, T4, and T5 districts: Alleys/rear lanes shall be provided along the rear property
lines of lots as follows:
a. In new subdivisions greater than 1 acre, alleys shall be provided for newly created lots that
meet any of the following criteria:
i. The lots are part of a block face with an average lot width of 60 feet or less at
the building setback line (excluding lots on cul-de-sacs).
ii. The lots are arranged around a Common Open Space.
iii. The lots front a collector or arterial road, regardless of the average lot width.
iv. The lots are intended for multi-family dwellings and/or mixed-use buildings.
b. In infill situations, the same standards apply as specified above, but only for developments
that include 4 or more contiguous lots, where one lot is a corner lot. In the Historic District,
the standards apply only to the Beaufort Conservation District; the requirement may be
waived at the discretion of the Historic Review Board.
F. Specific to Commercial Developments and Subdivisions:
1. Out-parcels: Out-parcels for shopping, office, or industrial centers shall be limited to internal
access to the center, unless otherwise approved as part of a master development plan. All
driveways shall be paved from the road to the property line.
2. Abandoned Driveways: Abandoned driveways (i.e., curb cuts that are no longer used for
vehicular access and are physically blocked by structures) shall be closed, and the area shall be
restored to the typical cross section of the right-of-way.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 11 of 43
7.2.4 STREET DESIGN STANDARDS
A. Street Section Design: The elements and widths of all proposed streets shall be in conformity with the
appropriate street section designated in the Street Regulating Plan (Section 7.2.1 and Appendix C).
B. Traffic Control and Signs: The type and location of traffic control devices used on City streets must be
approved by City Staff, and traffic control on private Streets shall be included and approved as part of
the major subdivision or site plan. Traffic signals should be used where warranted, but alternate traffic
control such as roundabouts should be considered first. When it can be shown that a particular zoning
action, master plan, or development plan impacts the street system to a point that a traffi c signal is
warranted according to Manual on Uniform Traffic Control Devices (MUTCD) and approved by City
Staff, the developer shall be responsible for all or a portion of the signal installation.
C. Sidewalks/Multi-use Paths: Where required per the Street Section in Appendix C, all sidewalks or
multi-use paths must be constructed concurrently with the street, or, if the street is already
constructed, prior to acceptance of any improvements. Exceptions to, the requirement to in stall a
sidewalk may be granted by the Planning Commission if:
1. Alternative pedestrian paths/bikeways have been or will be provided outside of the normal right -
of-way.
2. There are unusual topographic, vegetative, or other natural conditions to the extent that strict
adherence to said requirements would be unreasonable and not consistent with the purposes
and goals of this Code.
D. Utility Easements: Utility easements which require a width of 8 feet or larger shall be located in rear
alleys or along the side or rear lot lines. Special permission to install utility easements in other locations
may be requested by the utility companies and is subject to approval by the appropriate Design Review
Body.
E. Special Consideration to Protected Resources and other Natural Features: Street layout and design
shall give additional consideration to preserving protected resources and enabling natural areas to be
protected or minimally disturbed. Where streets are built in areas that have protected resources or
natural features, all utilities shall be placed within the street right-of-way and under the street in order
to avoid additional destruction of the natural features.
7.2.5 STREET TREE PLANTING REQUIREMENTS
A. Planting Areas: Planting strips and tree wells shall be established in accordance with the width and
plantings designated in the appropriate Street Section of the Street Regulating Plan (7.2.1 and
Appendix C).
B. Location and Number: Street trees shall be planted in the location and per the spacing specified for the
corresponding street classification in Appendix C. However, in specific cases, where due to the location
of utilities or other site constraints exist, the Planning Commission may allow street trees to be planted
on private property adjacent to the right-of-way.
C. Tree Species: Overstory and understory trees as prescribed in this section reference Appendix A.2
(Recommended Trees and Shrubs).
D. Minimum Tree Size: At the time of planting, young trees should be 2.5 inch caliper, with the lower side
of the crown a minimum of 6 feet above grade to avoid hazards to pedestrians.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 12 of 43
7.3: STREET ENGINEERING STANDARDS
7.3.1 STREET DESIGN, CERTIFICATION, AND CONSTRUCTION SPECIFICATIONS
A. Design Drawings and Certification: Professional engineers, registered in the state, shall prepare plans,
profiles, cross sections, and specifications for all subdivision roads and streets. The engineers shall
certify roads/streets are built to comply with the approved plans and specificati ons. Cross sections
shall be developed every 100 feet at intersections and break points in grade. Cross sections shall show
the complete rights-of-way including travel lanes, shoulders, ditches, curb and gutter, and sid ewalks
and utility locations, as applicable.
B. Construction Specifications for Paved Streets: Street construction specifications for paved streets shall
be in compliance with the South Carolina Department of Transportation Standards.
7.3.2 TRAFFIC IMPACT ANALYSIS
A. Applicability: A "traffic impact analysis" (TIA) shall be required for any development that is shown — in
the most recent Institute of Transportation Engineers (ITE) Trip Generation Manual or any alternative ,
approved at the discretion of the Planning Commission or the TRC, or by the engineering department
— to generate more than 50 trips during the peak hour on the adjacent street(s).
1. A second phase, second subdivision, or addition that generates traffic beyond this threshold
when taken as a whole shall also require a TIA, even though that development does not qualify
on its own.
2. A use shall not be changed without conducting a new TIA if the new use would generate traffic
beyond the 50 trips during peak hour threshold above. The Planning Commission may waive this
requirement.
3. Exception: Development — except for Educational Facilities with greater than 100 students — on
lots included in the Boundary Street Master Plan, adopted on August 28, 2006, and lots in the
area bounded by Calhoun Street, Carteret Street, Bay Street, and Ribaut Road, and lots zoned
Limited Industrial (LI), shall not be subject to the requirements of this section.
B. Traffic Access Management Analysis: As part of the TIA process, the proposed development shall have
an "access analysis" undertaken by the administrator to ensure that sufficient access to all proposed
developments and subdivisions is achieved.
1. The standards in the South Carolina Department of Transportation's "Access and Roadside
Management Standards Manual" (a.k.a. ARMS Manual) shall serve as a guide for this analysis,
which shall include identification of the following:
a. Access improvements that the applicant must install at his or her expense, such as
deceleration lanes;
b. The location of any curb cuts based on, but not limited to, sight distances, existing roadway
infrastructure, opposing driveways locations, and shared access;
c. Requirements for adequate driveway design, including, but not limited to, turning radius
and stacking distance.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 13 of 43
2. The access requirements approved by the Planning Commission or the TRC shall be incorporated
on development or subdivision plans prior to their approval.
3. If an applicant is required to provide site-related traffic improvements, the cost of implementing
such improvements shall be borne by the applicant, and no such costs shall be eligible for a credit
or offset from any transportation impact fees unless specifically permitted by the Development
Fee Procedures - Beaufort County Code of Ordinances, Chapter 82, Article VII or most recent
version.
C. Traffic Impact Analysis Plan Preparation:
1. The TIA shall be conducted by an engineer registered in South Carolina who is experienced in the
conduct of traffic analysis.
2. Prior to beginning the TIA, the applicant shall supply the city with the following:
a. A written narrative describing the proposed land use(s), size, and projected opening date of
the project and all subsequent phases.
b. A site location map showing surrounding development within a one-half mile of the
property under development consideration.
c. A proposed site plan or preliminary subdivision plat illustrating access to public or private
roads and connectivity to other contiguous developments.
3. Prior to beginning the TIA, the applicant shall receive, in writing, the parameters to be followed in
the study, including the directional split of driveway traffic, trip distribution, background traffic
growth rate, previously approved but not completed projects, and the intersections to be
analyzed, along with any associated turning movement counts that are available or discussed and
approved by the TRC.
4. To review the TIA, the Planning Commission and TRC will require current trip generation
information, available information on land use, travel patterns, and traffic conditions, and shall
consult with the SCDOT.
D. Plan Contents:
Background information Requirement
List of all nonexistent transportation improvements
assumed in the analysis
Required
Map of site location, description of the parcel,
general terrain features, and location within the
jurisdiction and region.
Required
Description of geographic scope/ limits of study
area.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed.
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Plan at an engineering scale of the existing and
proposed site uses.
Required
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 14 of 43
Description and map or diagram of nearby uses,
including parcel zoning.
Required
Description and map or diagram of existing
roadways.
Required
Description and map or diagram of programmed
improvements to roadways, intersections, and
other transportation facilities within the study
area.
Required
Analysis of Existing Conditions
Collected daily and peak hour of the generator
traffic volumes, tabulated and presented on
diagrams with counts provided in an appendix.
Required
Analyses for intersections and roadways identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for
each lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments, tabulated and
presented on diagrams, if facilities or routes exist.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed –
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Incorporation of all Traffic Impact Analysis studies
and Trip Generation from approved developments
or vested unbuilt developments within mile radius
at time of proposal.
Required (submitted for any jurisdiction, including
the Town of Port Royal, and County of Beaufort)
Speed Study If requested by City
Crash history near site If requested by City
Sight distance If requested by City
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 15 of 43
Analysis of Future Conditions without Development
Description of and justification for the method and
assumptions used to forecast future traffic volumes.
Required
Analyses for intersections and roadways as identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for each
lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments tabulated and
presented on diagrams, if facilities or routes exist or
are planned.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed.
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Trip Generation
Site trip generation, with tabulated data, broken out
by analysis year for multi- phase developments, and
including justification for deviations from ITE rates, if
appropriate.
Required
Description and justification of internal capture
reductions for mixed use developments and pass-by
trip reductions, if appropriate, including table of
calculations used.
Required
1. Phased Developments: All phases of a development are subject to review, and all traffic plans for
the entire development shall be integrated with the overall traffic analysis. A TIA for a specific
phase of development shall be applicable to the phase of development under imme diate review.
However, each phase of development shall expand and provide detailed analysis at the
development plan stage beyond the estimates provided for at the concept plan or master plan
stage.
2. Infrastructure Analysis: The adequacy of the roads that the development will be accessed from
shall be assessed in the TIA. Recommendations for improvements shall be made. The relative
share of the capacity created shall be broken down as follows: development share, other
developments' share, any existing overcapacity, and capacity available for future growth.
3. Required Elements of the TIA:
a. A site plan or subdivision plat identifying accesses to and from existing or proposed streets
and intersections, along with all opposing intersections across adjacent streets.
b. Description of the proposed development, including the type and intensity of proposed
land use(s) including, but not limited to: the number of residential units by type, the
number of existing and proposed lots, the type of proposed nonresidential devel opment
and the amount of such development measured by gross floor area or other appropriate
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 16 of 43
unit of measurement, the general size and type of accessory development or facilities, and,
for nonresidential development, adequate information to identify the appropriate land use
category for trip generation.
c. Projected vehicular trips to and from the completed development during a.m. and p.m.
peak hour — trip rates shall be taken from ITE Manual or alternatively, an applicant may
elect to perform, at his own expense, a "trip generation study" which may be su bmitted as
part of the traffic impact analysis plan. Such trip generation study shall be subject to the
review and verification of the TRC and engineer. For proposed uses not specifically listed in
the ITE Manual, and for which a trip generation study has not been performed, the
designated engineer(s) shall determine the most appropriate trip generation rate. The TRC
shall make the determination of the appropriate trip generation rate, from whatever the
source. The percentage of pass-by trips, if used in the plan, shall be included, as well as the
source of this information.
d. A written narrative setting forth the assumptions upon which any projection was made in
developing the traffic impact analysis plan shall be included in the analysis. If the
assumptions are derived from the ITE Manual, the materials shall be referenced and
properly cited. If the assumptions are not from the ITE Manual, appropriate excerpts from
other reliable transportation planning resources shall be included in the study, and reasons
underlying the assumptions shall be stated in the narrative.
e. The TIA shall review access to the site. The adequacy of the entrance design shall be
evaluated, and recommendations made on acceleration and deceleration lanes, left -turn
lanes, or signalizations shall be part of the TIA. Educational facilities shall include pick -up
and drop-off plans and analysis of the impact on the surrounding streets and interse ctions.
f. The TIA shall review the number and types of curb cuts that are permitted. In particular,
the TIA shall assess the connection of the property to adjoining properties. Where the use,
scale of development, or size of adjoining properties is such that trip s would be anticipated
between the proposed use and the other properties, the TIA shall make recommendation
on interconnections. The TIA shall recommend interconnections to provide a smooth flow
of traffic between uses along arterials and collector roads to ensure that as much traffic as
possible uses secondary roads, rather than major roads, for short trips.
g. The TIA shall be based on intersection analysis procedures for signalized intersections as
identified in the most current edition transportation research board's highway capacity
manual, and/or the last update that analyses and emulates these procedures by means of
computer software, if available. The results of any required analysis/computer analysis
shall, at a minimum, indicate compliance or variance from the Traffic Goals (Section 7.3.3
M).
h. The intersections that must be analyzed in the study are identified as:
i. Any intersection that serves as a development's point of access. This will
include intersections of public and/or private roads with major arterials, and
driveways offering direct access.
ii. The first major intersection as identified by the city engineer on both side of
the development's point of access.
iii. Other intersections on major arterials if development generates more than 50
a.m. or p.m. peak hour trips to that intersection, or if the intersection's level of
service or demand is significantly impacted by site related traffic.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 17 of 43
iv. Unsignalized intersections and access drives — these shall be considered if
development impacts are anticipated. The plan must include the results of an
analysis of the operating conditions of critical intersections and/or all
intersections identified in the concept plan. The analysis shall reflect the
projected condition of these intersections and movements, based on the
scheduled opening date of the development. Other phases of the development,
if they can be reasonably determined, shall be considered as well.
E. Mitigation Plan Required: If the initial analysis indicates that the city's adopted Traffic Service Level
Goals (Section 7.3.2 M.) will not be met, a mitigation plan must be prepared, based on additional
analysis. The mitigation plan must show how the city's Traffic Service Level Goals are addressed as
mitigated. Applicants will be responsible for mitigating the traffic impacts at any intersection affected
by a proposed development.
1. If a traffic signal is recommended, the TIA shall provide information that:
a. Clearly indicates the need for a traffic signal.
b. Assesses the ability of other existing, planned, or proposed public roads to accommodate
the new traffic at a location other than the main highway in the vicinity of the proposed
development.
c. Describes in detail how a specific development will affect the study area transportation
system.
d. Provides documentation of appropriate South Carolina Manual of Uniform Traffic Control
Devices signal warrant satisfaction.
e. Gives design geometry of the private road that is consistent with that of public road
intersections, including curbs, appropriate lane widths, pavement markings, and vertical
alignment. Other roadway factors to be considered include, but are not limited to, speed,
type of highway, grades, sight distance, existing level of service, conflicting accesses, and
the effect of future traffic signal systems.
f. Provides an approach-throat length for the road to ensure the movement of vehicles
entering the site will not be impeded by conditions within the development and ensure
that all signal-spacing requirements are adequately met.
2. The desirable spacing of signalized intersections on principal arterials is the SCDOT, county, or
city standards. The TRC may recommend to SCDOT the installation of a traffic signal at locations
where, using SCDOT standards, spacing is inappropriate due to topography, existing or proposed
road layout, documented accident history, unique physical constraints, existing or proposed land
use patterns, or requirements to achieve specific objectives for highway segment designations, as
shown in any locally adopted land use or transportation plan, approved city or county
transportation plan, or approved transportation policy.
3. Signal spacing concerns may be ameliorated in the following ways:
a. A proposed private road that may otherwise be considered for the installation of a traffic
signal may be replaced by an on-site route or a frontage road that directs traffic to or from
a nearby public road.
b. A private road that is being considered for traffic signal installation may be required to
connect to the existing or planned local road system to allow uses of surrounding
properties.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 18 of 43
c. An existing or proposed intersection may be relocated.
d. A shared private road may be required to serve the needs of the multiple properties.
4. A traffic signal progression analysis is required if the proposed location is closer than the SCDOT
standards, given the presence of existing signals or the possible existence of identified future
signals proposed as part of a highway signal system. A traffic signal progression analysis for all
new, revised, or planned traffic signal systems on state highways shall be performed using
methods, models, computer software, data sources, roadway segment length, and assumptions
approved by the TRC. The roadway segment, analyzed to the extent possible, shall include all
traffic signals in the existing or future traffic signal system. The progression analysis shall:
a. Demonstrate acceptable existing and future traffic signal systems operation that may
include the morning peak, evening peak, midday period, and other appropriate time period
during any day of the week, adjusted for peak season, for cycle lengths and tra vel speeds
approved by the TRC.
b. Provide for a progressed traffic band speed no more than 5 mph (8 km/h) below the
existing posted speed for both directions of travel during the off-peak periods, nor more
than 10 mph (16 km/h) below the existing posted speed during peak periods. Approv al by
the TRC is required where speeds deviate more than the above.
c. Demonstrate that sufficient vehicle storage is available at all locations within the traffic
signal system without encroaching on the functional boundaries of adjacent lanes and
signalized intersections. The functional boundary of an intersection shall be determined in
discussion with the TRC, based on existing or projected conditions.
d. Provide a common cycle length with adequate pedestrian crossing times at all signalized
intersections.
e. Provide a progression bandwidth as large as that required, or as presently exists, for
through traffic on the federal or state highway at the most critical intersection within the
roadway segment. The most critical intersection is the intersection carry ing the highest
through volume per lane.
5. The traffic signal progression analysis shall be supplemented by a traffic engineering report that
also considers highway capacity and safety of the roadway segment under consideration. Traffic
volumes, intersection geometry, and lane balance, considered at all locations, shall be
appropriate for the present and identified future conditions, which are usually considered to
include the year of completion, and 5 years into the future.
F. Summary: A clear and concise summary of recommended improvements that can serve as an
executive summary is required.
G. TIA Review: The TRC shall review all TIAs as part of the applicable Design Review phase —. Final TIAs
shall be approved prior to the applicant submitting a Project Permit application (Section 9.5).
H. Application: A TIA shall be submitted to the TRC. Coordination with other entities in the county
government or South Carolina Department of Transportation (SCDOT) shall be the responsibility of the
city.
I. Completeness: The Planning Commission and/or TRC shall determine whether a TIA is complete.
Thorough and complete TIAs are the responsibility of the applicant. Failure by the applicant to provide
a complete TIA may result in review delays for their plat or plan.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 19 of 43
J. Action on TIA: The TRC must first approve the TIA in regard to completeness and accuracy. Following
review of the required impact analysis plan, TRC shall recommend to the Planning Commission action
as follows:
1. Approval of the TIA as submitted;
2. Approval of the TIA with conditions or modifications as part of the development review and
approval process. An acceptable TIA with traffic mitigation measures may include the reduction
of the density or intensity of the proposed development, phasing of the proposed development
to coincide with state and/or county-programmed transportation improvements, applicant-
provided transportation improvements, fees in lieu of construction, or any other reasonable
measures to ensure that the adopted traffic service-level goals are met. If mitigation is required,
it shall be required as a condition of any approval from the city.
K. Timing of Implementation: If a traffic mitigation program is part of an approved TIA, the developer
may be required to place a performance bond on all traffic mitigation improvements required as a
result of his project. This requirement may arise if the timing of the improvements needs to be
synchronized with other scheduled improvements anticipated for the area.
L. Responsibility for Costs of Improvements: The costs of implementation of an approved mitigation
program shall be the responsibility of the applicant. No certificates of zoning compliance or building
permits shall be issued unless provisions of the TIA are met.
M. Traffic Service Level Goals: The average stop time delay in seconds per vehicle for each intersection
determined to be critical to the TIA for the proposed development shall be compared to the city's
traffic service level goal of "D" for the average delay for all vehicles at any sign alized intersection during
the a.m. and p.m. peak hours.
7.4: COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE
7.4.1 PURPOSE AND INTENT
A. Intent: Community Green Space and Community Open Space is intended for the use and enjoyment of
a development's residents, employees, or users. These spaces serve to preserve natural areas, ensure
access to open areas and recreation, reduce the heat island effect, enhance stormwater quality, and
provide community health benefits. Community Green Space and Community Open Spaces are not, by
definition, required to be deeded or to be granted via easement to any public entity or municipality.
See Section 7.4.5 for ownership information.
B. Purpose: The purpose of this section is to provide a set of Community Green Space and Community
Open Space types and their associated standards to use within all districts. Community Green Space
and Community Open Space types in this section are distinct from those areas that are environmentally
sensitive and must be otherwise protected as regulated through Article 8 (Environmental Protection) .
C. Applicability: See Section 7.1.2.
D. Community Green Space Definition: an area of grass, trees, parks, trails or multi-use pathways, or
other vegetation set apart for recreational or aesthetic purposes within a development. It can be
privately or publicly owned.
E. Community Open Space Definition: Open space is land or water that is undeveloped and not used for
residential, commercial, industrial, or institutional purposes. It can be privately or publicly owned, and
can include areas like forests, farms, parks, and coastal lands.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 20 of 43
7.4.2 COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE REQUIREMENT
A. Minimum Requirements: Development in all districts shall preserve the minimum amounts of
Community Green Space and Open Space as identified below (see following page):
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 21 of 43
B. Areas to be Included in Community Green Space and Community Open Space Calculations: The features and areas identified in Section 7.4.3 shall
be credited towards the open space requirements for the purposes of complying with this article.
C. Areas not to be Included in Community Green Space and Community Open Space Calculations: The following areas shall not be counted toward
open space requirements:
1. Private yards which are not subject to an open space or conservation easement.
2. Public road rights-of-way or private street easements, including sidewalks located within those rights -of-way or easements.
3. Open parking areas and driveways for dwellings.
4. Land covered by structures not designated for active recreational uses.
5. Designated outdoor storage areas.
OPEN/CIVIC SPACE REQUIREMENT
SIZE T1 T3-S T3-N T4-HN T4-N T5-DC T5-UC RMX IC LI MHP 1
Less than 3
acres See footnote (3)
3 acres—
10 acres 50% 20% 15% exempt 10% exempt 10% 10% 15% exempt
10 acres—15
acres 50% 20% 15% exempt 10% exempt 10% 15% 20% exempt 10%
15 acres—40
acres 50% 20% 15% n/a 15% exempt 15% 20% 20% exempt 10%
Greater
than
40 acres
50% 25% 20% n/a 20% exempt 20% 25% 25% exempt 10%
1 Each Manufactured Home Park shall have a minimum total area of 2,500 square feet set aside for common recreational open space, or at
least 100 square feet of space for each mobile home lot, whichever is greater.
2 Specific to TND Overlay Projects: The open space requirement may be calculated comprehensively or by specific Transect zones. The
requirements of 2.8.3.G.2.c must be met in addition to the requirements of this table.
3 For properties less than 3 acres, community green space and community open space shall be at the discretion of the approving authority
(i.e.) Codes Administrator or Planning Commission.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 22 of 43
7.4.3 COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE TYPES
The majority of Community Green Space and Community Open Space shall conform to one of the 8 types in the table below. If 75% or more of the types listed
below are utilized for required open space, a 20% increase in number of dwelling units is permitted.
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Regional
Park/Natural
Preserve
A natural preserve that is
available for unstructured
recreation. It may contain
small civic buildings and
areas of structured activity,
but is primarily left natural.
These areas may include
forests as well as wetlands
and regional retention areas
if they are treated as
amenities (e.g. Port Royal's
Cypress Wetlands).
T1 Regional
Min: 200 acres*
Max: None
*Natural
preserves with
no structured
activity have no
minimum size.
Frontage:
Independent
Disposition:
Natural, formal
or informal
Passive and active
recreation, drinking
fountains,
Community facility <
7,500 gross square
feet, paths and trails
Sport Complex
An open space that
consolidates heavily
programmed athletic fields
and associated facilities.
T1, IC, RMX Regional
Min: 25 acres
Max: None
Frontage:
Independent
Disposition:
Formal or
informal
Passive and active
recreation, drinking
fountains, community
facility < 7,500 gross
square feet, paths
and trails
Community
Park
An open space that is
available for unstructured
recreation and a limited
amount of structured
recreation. It may contain a
limited amount of athletic
fields.
T3, T4, T5,
RMX, IC
Multiple
Neighborhoods
Min: 8 acres
Max: None
Frontage:
Independent
Disposition:
Informal
Passive and active
recreation, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 23 of 43
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Greenway
A linear open space that may
follow natural corridors, a
greenway provides
unstructured and limited
amounts of structured
recreation.
T1, T3, T4,
T5, RMX, IC
Multiple
Neighborhoods
Min: 8 acres or 1
mile
Max: None
Frontage:
Independent or
building
Disposition:
Natural or
informal
Passive and active
recreation, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Square/Green
An open space that is
available for civic purposes,
unstructured, and limited
amounts of structured
recreation. It can be located
along waterfronts.
T3, T4, T5,
RMX, IC
Neighborhood
Min: 0.5 acres
Max: 5 acres
Frontage:
Building
Disposition:
Formal
Passive and active
(unstructured or
structured)
recreation, accessory
structure, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Plaza
A formal open space
available for civic purposes
and commercial activities, a
plaza is typically hardscaped
and can be located along
waterfronts.
T4, T5, RMX,
IC
Neighborhood
Min: 0.5 acres
Max: 2.5 acres
Frontage:
Building
Disposition:
Formal
Passive recreation,
accessory structure,
drinking fountains,
paths and trails
Pocket
Park/Pocket
Plaza
An open space that is
available for informal
activities in close proximity
to neighborhood residences.
Pocket plazas are usually
paved.
T3, T4, T5,
IC, RMX
Neighborhood
Min: 4,000
square feet
Max: 0.5 acre
Frontage:
Building
Disposition:
Formal or
informal
Passive recreation,
accessory structure,
drinking fountains,
paths and trails
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 24 of 43
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Playground
An open space designed and
equipped for the recreation
of children. A playground
may be fenced and may
include an open shelter.
Playgrounds may be included
within other civic spaces.
T3, T4, T5,
IC, RMX
Neighborhood
Min: None
Max: None
Frontage:
Independent or
building
Disposition:
Formal or
informal
Accessory structure,
drinking fountains,
paths and trails
Notes:
1. The illustration and description of each civic space type is illustrative in nature and not regulatory.
2. The Permitted Districts may be modified per a plan if the project is utilizing the Traditional Neighborhood Development Floating Overlay District
(Section 2.8.3).
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 25 of 43
The following provisions apply to the eight (8) Community Green Space and Community Open Space Types listed in
the table:
A. Playgrounds and Community Gardens: These may be incorporated into any of the other Community
Green Space and Community Open Space types - except Natural Preserve - or may stand alone.
B. Waterfront: When Community Green Space and Community Open Space is required, per Section 7.4.2,
developments that contain waterfront access should include some type of common access to at least
25% of the waterfront. This counts towards the Community Green Space and Community Open Space
requirement. When open space is required, for every 10% of the waterfront that is allocated for public
access, a 5% increase in number of dwelling units shall be permitted, up to a maximum of a 20%
increase.
C. Illustrative Standards: The columns titled "Diagram," "Description," and "Typical Facilities" of the table
of Community Green Space and Community Open Space Types are illustrative only.
D. Regulatory Standards: The following elements shall be regulatory:
1. Service Area: Describes how the space relates to the city as a whole and the area that will be
served by the Community Green Space and Community Open Space.
2. Size: The permitted size for each Community Green Space and Community Open Space.
3. Frontage: The relationship along property lines of a Community Green Space and Community
Open Space to adjacent buildings or lots.
a. Building: Community Green Space and Community Open Spaces that are listed as having a
"building" frontage shall have the fronts of buildings, either attached to the park or across
a street, facing onto the space for a minimum of 75% of the perimeter.
b. Independent: Community Green Space and Community Open Spaces that are listed as
having an "independent" frontage shall have the fronts of buildings, either attached to the
park or across a street, facing onto the space to the maximum extent possible, but may
have the side or rear of a building or lot front onto the space. The side or rear of a building
or lot fronting onto the Community Green Space and Community Open Space shall be
designed with a secondary frontage and entrance along the space.
4. Disposition: The character of the design of the Community Green Space and Community Open
Space.
a. Natural: Civic spaces with natural character are designed in a natural manner with no
formal arrangement of elements.
b. Formal: Civic spaces with a formal character have a more rigid layout that follows
geometric forms and have trees and other elements arranged in formal patterns.
c. Informal: Civic spaces with an informal character have a mix of formal and natural
characteristics.
5. Food Production: Community Gardens and other Community Green Space and Community Open
Spaces may be used to grow food. See Section 8.4.3 for specifications and requirements.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 26 of 43
7.4.4 DESIGN OF COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACES
A. Design Standards for Community Green Space and Community Open Space: Land used as Community
Green Space and Open Space shall meet the following design standards:
1. Location:
a. Where relevant and appropriate, the land shall be located so as to be readily accessible and
usable by residents and users of the development. To the maximum extent practicable, a
portion of the open space shall provide focal points for the development.
b. Common space set aside for children's play areas and other recreational activities shall be
clearly visible from the dwelling units on the site.
c. The land shall, to the maximum extent practicable, be located to adjoin, extend, and
enlarge any open areas, trails, parks, or other open space resources that exist or are
planned within or adjacent to the development.
2. Provision in Multi-Phase Developments: In multi-phase developments, open space Manuals may
be calculated either by phases, or by collectively looking at the development as a whole.
B. Accessory Structure Standards: All accessory structures within parks and open spaces — including, but
not limited to, restrooms, open-air pavilions, gazebos, picnic shelters, and outdoor theaters — shall not
be subject to the physical requirements of the building form or siting standar ds in Article 2 (Map and
Districts). They shall be designed to be consistent with the character of the district in which they are
located. Such consistency may require accessory structures to maintain building setbacks, fro ntage,
massing, disposition, and character similar to adjacent development as determined by the
administrator.
7.4.5 OWNERSHIP AND MAINTENANCE OF COMMUNITY GREEN SPACE AND COMMUNITY
OPEN SPACE
A. Open space areas or other community facilities shall be preserved and maintained in accordance with
the approved:
1. Development Design, in accordance with Section 9.8;
2. ZBOA Special Exception, in accordance with Section 9.13; or
3. Subdivision, in accordance with Section 9.9, whichever is appropriate.
B. Provision must be made by the property owner to ensure preservation and long term maintenance and
management of Community Green Space and Community Open Spaces through one of the following
mechanisms:
1. Conveyance of the land to a property owners' or homeowners' association that holds the land in
common ownership and will be responsible for managing and maintaining it for its intended
purposes.
2. Conveyance of the land to a third-party beneficiary, such as a nonprofit environmental or civic
organization, that is organized for, capable of, and willing to accept responsibility for managing
and maintaining the land for its intended purpose.
3. Dedication of the land to the city or other appropriate public agency that is organized for,
capable of, and willing to accept responsibility for managing and maintaining the land for its
intended purposes.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 27 of 43
C. All methods utilizing private ownership shall require deed restrictions, covenants, or other legal
instruments that ensure continued use of the land and facilities for their intended uses, and provide for
the continued and effective management, operation, and maintenance of the land and facilities.
D. Failure to maintain Community Green Space and Community Open Space areas or other community
facilities shall be a violation of this Code subject to the remedies and penalties in Article 12 (Violations
and Enforcement).
E. If the owner of an Community Green Space and/or Community Open Space fails to maintain it in
reasonable condition, and in accordance with approved plans, and fails to correct deficiencies cited by
the city, the city shall have the authority to correct the deficiencies per the City's Code of Ordinances at
the owners expense.).
7.5: SUBDIVISION AND SITE PLAN STANDARDS
7.5.1 GENERAL PROVISIONS
The provisions of this Section shall apply to any and all subdivision of land , or site plan within the municipal
boundaries of the City, unless expressly and specifically exempted or provided otherwise in this Code. No
development shall be undertaken without prior approval or authorization pursuant to the terms of this Code.
All development shall comply with the applicable terms, conditions, requirements, standards and procedures
established in this Section and the Code. The submittal of an application for approval pursuant to the
provisions of these Subdivision Regulations constitutes consent to , and agreement to comply with, all of its
applicable provisions.
This Section establishes procedural and substantive rules for obtaining the necessary approval to develop
land and construct buildings and structures. Development applications will be reviewed for compliance with
the City’s Comprehensive Plan, Civic Master Plan, Beaufort Preservation Manual, and this Code.
Scheduling of the review of development applications before Staff, TRC, the Planning Commission or City
Council is at the discretion of the City. Any change to a development application by an Applicant after formal
submittal of that application to the City constitutes a decision by the Applicant that may result in the City
deciding to vacate the Hearing and/or void the pending application. The City may then reschedule or cancel
the review of the development application at its discretion.
Prior to formal submittal of any subdivision application identified in this Section, the Planning Department
will typically provide to an applicant an individualized submittal checklist indicating the documents and
information needed, quantities of those documents to be submitted, and the referral agencies that will be
involved in the review process. The applicants are responsible for being fully familiar with all applicable
provisions of these Subdivision Regulations. Upon determination by staff that a sub mittal constitutes a
complete development application, the City will forward the packets to each referral agency.
7.5.2 SUBDIVISION TYPES AND PROCESS OUTLINES
Methods of land subdivision. There are two ways to subdivide land based on the magnitude of scale: Minor
Subdivision and Major Subdivision.
A. Minor Subdivisions.
Definition. A Minor Subdivision is a subdivision, or amendment to a subdivision, which has been
previously platted, includes no additional public right-of-way dedication, and includes one or more of the
following:
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 28 of 43
1. The boundaries of six five or fewer lots are created from one parent tract or lot, no further
subdivisions shall be allowed from any lot created or the parent tract ;
2. Any lot line adjustment;
3. A consolidation of multiple lots into one when a new street or street change is not involved.
B. Major Subdivisions.
Definition. A Major Subdivision is a subdivision which includes one or more of the following:
1. Dedication of public right-of-way, public infrastructure or other public tracts, or a private road; or
2. The subdivision consists of six or more lots or tracts.
3. The creation of lots on property that has never previously been platted.
7.5.3 SKETCH PLAN
A. Sketch Plan purpose. The Sketch Plan is a conceptual design of the development submitted with a major
subdivision application, that depicts what the applicant envisions for the overall development, including
zoning, transportation, pedestrian network, parks, tree canopy, open space, and other amenities. The
purpose is to allow the Applicant, the Planning Commission, and the Community the opportunity to
discuss the conceptual subdivision before it goes through the major subdivision platting process.
B. Requirements. A Sketch Plan shall be submitted and provided to staff is in advance of a any public and/or
community meeting for all major subdivisions. Major proposed changes to any approved preliminary
plat(s), may require a new Sketch Plan approval if the Code Administrator determines the changes are
significantly different from the sketch plan discussed at the public meeting.
The Sketch Plan shall consist of the following elements:
1. Road plan: The applicant shall provide a preliminary traffic plan that addresses the following
elements:
a. i. The proposed street network and connectivity to the existing road network, including all
proposed access points.
b. ii. The location and layout of all arterial and collector roads within the development.
c. iii. A current preliminary traffic impact study prepared by a licensed traffic
engineer which evaluates proposed access points, the existing street system, and any
need for any road improvements (including off-site improvements) created by the
proposed development.
2. Open space plan: The applicant shall provide a preliminary open space plan that depicts compliance
with Section 7.4 of this code, with the following elements:
a. i. Proposed open space distribution and location, including percentage of open space.
b. ii. Compliance with 7.4.2 Community Green Space and Community Open Space
Requirement.
c. iii. Required buffer areas as per Section 5.5.1.
d. iv. Wetland areas and setbacks as determined by SCDES-BCM, if applicable.
e. v. Proposed park locations, acreage, and types of parks as per Section 7.4.
3. Pedestrian network:
a. i. Location of all trails within development, and connection to existing trail network.
b. ii. Connectivity of sidewalks to the existing pedestrian system, including any off -site
sidewalk improvements. This includes planning for a one-quarter mile pedestrian shed.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 29 of 43
c. iii. Depiction of any bike lanes or any other multi-modal features.
4. Zoning/Design:
a. i. The location of zoning boundaries shall be provided with the application and depicted
on the Sketch Plan.
b. ii. The plan should show how the zoning is harmonious with the surrounding area, and
within the property itself.
c. iii. Conceptual building design and massing.
5. Overall utility plan:
a. i. A letter from the appropriate utility, confirming the existing capacity of the surrounding
utility system, and the future capacity of the utility system for the proposal. Utility plans for
the interior of the development (such as water and sewer service lines) are not required as
part of this process.
b. ii. Proposed connections to the existing utility system.
C. Sketch Plan application submittal. The applicant shall submit a complete Sketch Plan application package
to the City. The application package shall include the following items:
1. Development application form, fee.
2. Title commitment. The title commitment must be dated no more than 90 days from the date of
Sketch Plan application submittal.
3. Title of project.
4. North arrow, scale (not greater than one inch equals 200 feet) and date of preparation.
5. Vicinity map.
6. Legal description.
7. Acreage of property; acreage in each zoning district; acreage in parks; acreage in open space.
8. USGS topographic contours.
9. Location and approximate acreage of proposed land uses.
10. Existing easements and rights-of-way on or adjacent to the property
11. Existing streets on or adjacent to the property (show and label street name).
12. Note or table indicating how public dedication requirements will be met.
13. Table providing the following information for each proposed land use area: total acreage; proposed
density proposed number of dwelling units and/or commercial buildings.
14. Location and acreage of proposed open space and parks as per Section 7.4., trails, regional trail
connections, playgrounds, schools or other public uses.
15. Proposed street system depicting the location and layout of all arterial and collector roads within
the development.
16. A preliminary traffic study prepared by a licensed traffic engineer which evaluates proposed access
points, the existing street system, and any need for any road improvements (including off -site
improvements) created by the proposed development.
17. Floodplain boundary with a note regarding the source of information (if a floodplain does not exist
on the property, this must be stated).
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 30 of 43
18. Zoning on adjoining properties.
19. A letter from the appropriate utility, confirming the existing capacity of the surrounding utility
system, and the future capacity of the utility system for the proposal. Utility plans for the interior
of the development (such as water and sewer service lines) are not required as part of this
process.Utility Plans for the interior of the development (such as water and sewer service lines) are
not required as part of this process.
20. Proposed connections to the existing utility system.
21. The location of any proposed or required lift stations.
22. Design rationale — description of how the development is integrated with surrounding area, how it
responds to site features/constraints and how it is consistent with this Code.
23. General description of plan for drainage and storm water management, including any regional
drainage solutions.
24. Description of how the proposed development complies with the City Comprehensive Plan.
25. Design: (i) Concept of lot impact study regarding structure location and massing design on typical
lots; (ii) Concept design representations of structures.
D. Application certification of completion. Within 30 days, staff shall either certify the application is
complete and in compliance with all submittal requirements or reject it as incomplete and notify the
applicant of any deficiencies. Applicant shall then correct any deficiencies in the applicat ion package and
re-submit the application to the City.
E. Sketch Plan Process.
1. Planning Commission Meeting. The Planning Commission shall hold a public meeting to discuss
review and provide comments on the Sketch Plan.
2. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting by regular mail to neighboring property owners within 500 feet of the
property per this Code.
F. Sketch Plan review criteria. The Planning Commission shall use the following criteria in addition to other
applicable provisions of this Code to evaluate the applicant's application:
1. The land use mix within the project conforms to Beaufort's Zoning District Map and Comprehensive
Plan Preferred Land Use Map and furthers the goals and policies of the Comprehensive Plan.
2. The Sketch Plan represents a functional system of land use and is consistent with the rationale and
criteria set forth in this Chapter, the City’s Comprehensive Plan, and the Civic Master Plan as
amended.
3. The preliminary traffic, open space, park, utility, and pedestrian design is adequate and functional
given the existing and planned capacities of each system, and meets the standards found in this
Code.
4. The conceptual design and massing proposed is consistent with the requirements of the
Development Code.
G. Timeframe related to approval of Sketch Plan. A Sketch Plan is in full force and effect for a period of 12
months from date of Planning Commission action.After a period of 12 months has passed without
submittal of a Preliminary Plat application, the Codes Administrator may require an applicant to submit a
new Sketch Plan application for Planning Commission review.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 31 of 43
H. Minor amendments. Minor amendments to the Sketch Plan may be approved administratively under the
following conditions:
1. Does not change any land use, or location of any land use.
2. Does not change the number of lots or density by more than ten percent.
3. Does not contain significant changes in arterial or collector street alignment and/or access points,
or other major public elements such as drainage improvements, utility lines or facilities.
4. Does not change any measurable standard (other than above), such as open space, or park area, by
more than ten percent.
7.5.4 PRELIMINARY PLAT
A. Preliminary Plat purpose. The purpose of the preliminary plat is to provide the City with an overall plat
and the associated preliminary engineering for the proposed development.
B. Preliminary Plat application process.
1. Pre-application conference. A pre-application conference/TRC with the City is required before the
applicant may submit a preliminary plat application. Topics to be discussed will include:
a. The provisions of this Code and the applicable requirements;
b. The application and review process;
c. Submittal requirements; and
d. Changes or modifications based on direction from the Planning Commission at Sketch Plan
approval.
2. Preliminary Plat application submittal. Following approval or conditional approvalreview of the
sketch Sketch planPlan, the applicant may submit the complete preliminary plat application to the
City. The preliminary plat application package shall be formatted and packaged per the application
submittal checklist provided by the City and include the following items in both printed and
electronic formats:
a. Development application form;
b. Application fee;
c. Title commitment. The title commitment must be current and dated no more than 120 days
from the date of preliminary plat application submittal; and
d. The preliminary plat that shall provide the following information:
i. Title of project.
ii. North arrow, scale (not greater than one inch equals 100 feet) and date of preparation.
iii. Vicinity map.
iv. Names and addresses of owners, applicant, engineers and surveyors.
v. Legal description.
vi. Total acreage of property.
vii. Existing contours at two-foot intervals (based on USGS datum).
viii. Name and location of abutting subdivisions or owners of abutting property (if land is not
platted)
ix. Lots, blocks, and street layout (with cross-sections), dimensions and square footage for
each lot. Dimensions and square footages may be rounded to the nearest whole
number.
x. Consecutive numbering of all lots and blocks.
xi. Existing and proposed easements (including rights-of-way) on and adjacent to the
property.
xii. Existing and proposed zoning on and adjacent to property.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 32 of 43
xiii. Approximate location and size of existing sewer lines, water lines and fire hydrants.
Approximate location of proposed sewer lines, water lines, and fire hydrants with a
letter from BJWSA and the Fire Marshall.
xiv. Location by field survey or aerial photography of existing and proposed water courses
and bodies of water such as irrigation ditches and lakes. Water courses shall include
direction of flow.
xv. Tree Survey and with Existing Tree Canopy Survey.
xvi. Floodplain boundary with a note regarding source of information (if a floodplain does
not exist on the property, state this on the plan).
xvii. The boundaries of proposed phases of the subdivision if the final plat is intended to be
submitted in multiple phases.
xviii. General location of existing surface improvements such as buildings, fences, or other
structures which will remain on the property as part of the subdivision.
xix. Location and acreage of proposed parks, trails, playgrounds, schools or other public
uses.
xx. Location, function, ownership and manner of maintenance of any private open space.
xxi. Land use table including land uses, approximate acreage of each land use type,
percentage of each land use type density (net and gross) and how public dedication
requirement will be met.
xxii. Total number of lots.
xxiii. Number of each type of dwelling unit proposed.
xxiv. An AutoCad drawing file of the Preliminary Plat in a format specified by the City
Engineer or Codes Administrator.
xxv. Surveyor's certificate.
xxvi. Traffic impact analysis (if applicable) as per the requirements found in
this development code.
3. Preliminary Plat drawing standards. The preliminary plat drawing shall comply with the following
standards:
a. The preliminary plat shall be prepared by or under the direct supervision of a registered land
surveyor, architect and/or engineer, shall be signed and stamped by said surveyor, architect
and/or engineer, and shall meet applicable State of South Carolina requirements.
b. Except for parcels separated by easements (including public rights -of-way), public tracts, or
railroads, parcels not contiguous with each other shall not be included in one plat, nor shall
more than one plat be made on the same sheet. Contiguous parcels owned by different parties
may be included on one plat, provided that all owners join in the dedication and
acknowledgment.
c. Lengths on the preliminary plat boundary shall be shown to the nearest hundredth of a foot and
bearings shall be shown in degrees, minutes and seconds.
d. Bearings, distances and curve data of all perimeter boundary lines shall be indicated outside the
boundary line, not inside, with the lot dimensions.
e. Names and signatures of all owners of equitable interest in the property shall be on the
preliminary plat and shall be made in black drawing ink.
4. General development information. A written description of the existing conditions on the site and
the proposed development, including the following items:
54. Explanation of how the plat is consistent with this Code, the Comprehensive Plan, the Civic
Master Plan, and the Sketch Plan.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 33 of 43
65. Preliminary grading and drainage plan and report. This plan and report must be certified by a
South Carolina registered professional engineer or Land Surveyor and include approximate
earthwork quantities (how earthwork on the site is "balanced"), storm drainage concepts such as
locations of pipe and other conveyance facilities, locations for on-site detention or downstream
structural improvements, and soil erosion and sedimentation control plans and specifications. It
must also discuss the impacts on and to any existing floodways and/or floodplains both on and
adjacent to the site as well as any FEMA applications or approvals that may be required.
76. Preliminary water and sewer plan and study. This plan shall be prepared by a registered
professional engineer. It is necessary that the engineer consult with the appropriate utility service
providers regarding the design of all utilities through the subdivision.
87. Preliminary landscape and open space plan. The landscape plan must address the treatment of all
exterior spaces. Landscape plans are to be designed to meet the requirements of this Code and
show approximate locations of trees, shrubs, groundcovers, turf, buffering, fences, walls and other
site amenities that will be included in the plan.
98. Traffic study. A TIA with requirements consistent with Section 7.3.2. This study must be prepared
by a professional traffic engineer and identify the projected impacts to the local and regional traffic
system. The direct roadway impacts and proposed share in the cost of regional improvements and
intersections must be identified for the project.
109. Archaeological Impact Assessment. An applicant may be required to provide the City as per
Section 8.4 with a CHS records listing historically or archaeologically significant findings on the
property being subdivided at their expense.
1110. General ecological resource survey. Prepared by a qualified biologist, geologist, ecologist, or
similar qualified professional, a survey identifying the potential/absence/habitat of a threatened or
endangered species and wetlands or other ecologically sensitive area. Said survey shall make
practical recommendations regarding treatment or mitigation of the findings.
1211. Conceptual Design. Applicant should provide conceptual design and massing examples, (i.e.
conceptual typical building elevations, but not required for each individual lot) , consistent with the
requirements of the Development Code.
C. Planning Commission Hearing. The Planning Commission shall hold a public hearing to approve, approve
with conditions or deny the Preliminary Plat.
1. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting hearing by regular mail to neighboring property owners within 500 feet of the
property per this Code.
2. Approval. The Planning Commission shall review and act on the Preliminary Plat. The Planning
Commission shall approve, approve with conditions, or deny the Preliminary Plat based on the
review criteria below.
D. Preliminary Plat review criteria. In addition to all provisions of this Code, the Planning Commission shall
use the following criteria to evaluate the applicant's request:
1. a. The Preliminary Plat represents a functional system of land use and is consistent with the
rationale and criteria set forth in this Code.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 34 of 43
2. b. The land use mix within the project conforms to the City’s Development Code and complies with
the Comprehensive Plan and Civic Master Plan.
3. c. The utility and transportation design are adequate, given existing and planned capacities of those
systems.
4. ivd. Lot layout, including structure location and design of each lot.
E. Phasing. The preliminary plat shall designate the boundaries of phases for which separate final plats will
be presented for approval. Each phase, either alone or in conjunction with previously approved and
recorded phases, must meet all of the requirements of this Code.
F. Early grading. After approval of a Preliminary Plat, Applicant may proceed with preliminary grading of
the project area if a construction plan set for grading and drainage is approved and memo authorizing
grading work is issued by the City Engineer or Codes Administrator. Early grading and storage of
construction related equipment is at the risk of the Applicant and no presumption of any Final Plat
approval at the Planning Commission is expressed or implied by any authorization of early grading.
G. Timeframe related to approval of Preliminary Plat. A preliminary plat is in full force and effect for a
period of two years from date of approval. Approval will automatically expire at the end of two years
unless an applicant formally requests an 18 month extension from the Planning Commission prior to
termination or submits a completed final plat application for all or a portion of the property.
7.5.5 FINAL PLAT
A. Final Plat purpose. The purpose of the final plat is to complete the subdivision of land consistent with
the technical standards of the City of Beaufort.
B. Final Plat application process.
1. Final Plat application submittal. The final plat application shall substantially conform to the
preliminary plat as approved at the public hearing and shall meet all conditions of approval. The
applicant shall submit the completed final plat application package to the City. The final plat
application shall be formatted and packaged per the application submittal checklist provided by the
City and include:
a. Development application form.
b. Application fee.
c. Title commitment. An updated title commitment, dated no more than 120 days from the date
of final plat application submittal.
2. Final Plat Standards. The final plat drawing shall comply with the following standards:
a. All requirements of Section 7.5.4.
b. The plat shall be prepared by or under the direct supervision of a registered land surveyor,
shall be signed and stamped by said surveyor, and shall meet applicable State of South
Carolina requirements.
c. Existing and proposed easements (including rights-of-way) in and adjacent to property (labeled
and dimensioned).
d. Existing and proposed street names for all streets on and adjacent to the property.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 35 of 43
e. Final Traffic Impact Analysis (if applicable) as per the requirements found in the Development
Code.
f. If applicable, prior to commencement of construction; a State Highway utility permit from
SCDOT.
g. If applicable, prior to commencement of construction, a State Highway access permit from
SCDOT.
h. If applicable, prior to commencement of construction, a construction dewatering permit from
DHEC
i. If applicable, prior to commencement of construction, a 404 Permit from the Army Corps of
Engineers.
j. Prior to commencement of construction, acceptable collateral in the amount and form
stipulated in Section 7.1.5.
3. Original plats. The applicant shall submit to the City, five original, signed copies of the final plat
ready to record, and final executed copies of all agreements.
4. Complete engineering plans and specifications. As a condition of Final Plat approval the applicant
shall prepare and submit the following:
a. Construction plans and profiles. The plans and profiles shall be prepared by a registered
professional engineer licensed in the State of South Carolina. Plans shall be 24 inches high by
36 inches wide and provide the following information:
b. The horizontal to vertical scales shall be chosen to best depict the aspects of the design.
c. Minimum horizontal scale: One inch equals 100 feet.
d. Minimum vertical scale: One inch equals ten feet.
e. The typical road geometric and structural cross-section is to be shown on each plan sheet.
f. The plan must show right-of-way lines and widths, road names, lot lines, tangent lengths and
bearings, curve radii, delta angles, curve lengths, chord lengths and bearings, stationing at all
beginning of curves and end of curves, intersections, structures, angles, curb lines, cross pans,
traffic control devices (islands, striping, signs, etc.), drive cuts, curb returns and radii, and all
other features to enable construction in accordance with approved standards and standard
engineering practice. Stationing may be centerline if approved by the City Engineer or Codes
Administrator. Construction plans shall include water lines and appurtenances, sewer lines and
appurtenances, and storm water lines and appurtenances and any other wet utilities .
g. The profiles shall include existing and proposed grade at curb and gutter or centerline of street
elevation at point of intersection of vertical curves, intersections, grade breaks, point of curb
return (PCR), point of reverse curve (PRC), and other critical points, structures, and all other
features.
h. Signature blocks for all utility providers unless otherwise provided in agreement form.
i. Structure details. Sufficient data shall be given to construction of major structures and road
appurtenances such as bridges, culverts, gutters, drives, walks, cross pans, etc; detail shall
include orientation line and grade, cross-sections, dimensions, reinforcement schedules,
materials, quality specification, etc., or as the City Engineer may approve.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 36 of 43
j. Final Water Report. A final water report including hydraulic analysis and pipe sizing
calculations. Note, this report can be verified by BJWSA and does not need to be submitted to
the City.
k. Final Sanitary Sewer Report. A sanitary sewer report including hydraulic analysis and pipe
sizing calculations. Note, this report can be verified by BJWSA and does not need to be
submitted to the City.
l. Sewage collection and water supply distribution plans, profiles and specifications. The plans,
profiles and specifications shall be prepared by a registered professional engineer and shall be
accompanied by written approvals from BJWSA.
m. Final drainage plans and reports. Based upon the approved preliminary drainage plan, a final
report is to be submitted in accordance with SOLOCO Drainage and Design Criteria, as
amended or as the City Engineer may approve. The plan and report must provide:
n. Erosion control plans, when required.
o. Sizing of all pipes, inlets, conveyance ways, and other appurtenances.
p. Final grading plan. The final grading plan shall be 24 inches high by 36 inches wide and
illustrate existing and proposed contours and lot and block grading details.
q. Soils report. The soils report shall detail pavement design and construction requirements and
shall be submitted after overlot grading is complete.
r. Final landscape and open space plan. The landscape plan must address the treatment of all
exterior spaces. Landscape plans are to be designed to meet the requirements of this Code and
show trees, shrubs, groundcovers, turf, buffering, fences, walls and oth er site amenities that
will be included in the plan. All plant materials must be adapted to the physical limitations of
the local climate and specific conditions of the landscape plan. All plant materials must meet
specifications of the American Association of Nurseryman for number one grade. All street
trees must be selected from the City of Beaufort recommended tree list.
s. Landscape Plan drawn to scale (not greater than one inch equals 50 feet) on 24 by 36 -inch
sheets which includes:
i. Project name.
ii. Scale, north arrow and date of preparation.
iii. Existing and proposed streets and street names.
iv. Lot lines, easements and public rights-of-way as shown on the subdivision plat, including
gross and net area of all parcels.
v. Location of proposed building footprints and parking areas.
vi. Location of storage, loading and service areas.
vii. Existing and proposed two-foot contours (based on USGS datum).
viii. Natural features, wetlands, wildlife corridors, floodplains, streams, ditches and other
waterways.
ix. The location of existing and proposed utilities. Utility lines can be 'ghosted' in on the
landscape plan to vary the line types for cleaner drawings.
x. All existing trees within the proposed site and adjacent to the site must be accurately
identified on the plan. Existing trees must be labeled as to their size, species and if they
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 37 of 43
are intended to remain, be removed or transplanted. All replacement mitigation trees
will need to be shown separately on the plan. Tree protection standards for existing
trees to remain shall be included on the plan.
xi. The extent and location of proposed trees, shrubs and perennials and quantities of each
species. Plant materials are to be drawn at two-thirds of their mature size.
xii. Landscape schedule including the represented plant symbol, Latin name, common
name, planting size and number of individual plants. All plant materials are to meet the
minimum size requirements as provided in this Code.
xiii. Proposed treatment of all ground surfaces must be clearly indicated, including turf,
paving, mulch, native grass, seeded grass, etc. Grass areas are to be specified as seed or
sod, and a seed mix/rate specified.
xiv. Sight distance triangles must be shown at street intersections pursuant to this Code.
xv. Project specific landscape notes and details to ensure the proper planting,
establishment and survival of plant materials. Additional notes detailing the warranty
for plant materials and continued maintenance shall be included.
xvi. Open space and pedestrian circulation system.
xvii. Proposed grading of the project site, including drainage swales, detention basins,
retaining walls and any off-site infrastructure improvements.
xviii. Notes for conservation and retention of topsoil and landscape soil preparation.
xix. Restoration, revegetation or enhancement of disturbed natural areas or open space
feature.
xx. Park structures, signage, play equipment, and other landscape or park amenities and
appurtenances.
xxi. A "pdf" file and an AutoCad drawing file of the final plat in an electronic format
specified by the City Engineer.
xxi.xxii. Design standards as required in Site Plan section 7.5.7 B.4.
5. Post approval actions. Prior to issuance of a building or grading permit, the applicant shall submit
the following documentation to the City:
a. List of contractors. List of all contractors that will be performing the improvements.
b. Proof of insurance/business license. Proof of workman's comprehensive insurance and liability
insurance for each contractor and business license.
c. Open space deed restriction. Areas designated as open space shall be protected by a deed
restriction or other appropriate method to ensure that they cannot be subdivided or
developed in the future and will remain as open space until the use is modified by the City.
d. Construction traffic control plan. Applicant will develop a plan for City Engineer, Codes
Administrator or appointee, review that addresses construction traffic, construction water,
temporary road closures, street repairs, dust, noise and other construction -related concerns.
e. Other certificates, affidavits, enforcements or deductions as required by the City.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 38 of 43
C. Approval. The City Codes Administrator shall review and act on the Final Plat. The Codes Administrator
may choose to approve, approve with conditions, or deny the Final Plat based on the criteria below.
1. Final Plat review criteria. In addition to all provisions of this Code, the Codes Administrator uses
the following criteria to evaluate the applicant's final plat application:
a. The Final Plat is in substantial conformance with the approved Preliminary Plat. For the
purposes of this Code, "substantial conformance", includes design adjustments made to meet
any conditions of preliminary plat approval, and is determined as follows:
b. Does not change any land use.
c. Does not contain changes which would render the final plat in nonconformance with
requirements of this Code.
d. Does not contain significant changes in street alignment and/or access points, or other public
elements such as drainage improvements, utility lines or facilities.
e. Does not increase density by more than 15 percent.
D. Timeframe related to approval of Final Plat. A final plat is in full force and effect for a period of two
years from date of recordation unless a longer timeframe is specifically allowed by the City in an
approved Development Agreement or unless public improvements are completed and accepted on all or
a portion of the final plat. Applicants may formally request one 18 month extension from the Codes
Administrator prior to termination of final plat approval. Prior to the expiration of the original two year
timeframe or the extension timeframe, an applicant may formally request an additional extension if
substantial progress has been made on installation of public improvements.
7.5.6 MINOR SUBDIVISION PLAT
A. Minor Subdivision Plat purpose.
1. The purpose of the Minor Subdivision Plat is a subdivision, or amendment to a subdivision, which
has been previously platted, includes no additional public right-of-way dedication, and includes one
or more of the following:
a. The boundaries of five or fewer lots are created from one parent tract or lot, cumulatively and
not more than 3 acres; (ex. any portion of a tract that is subdivided counts toward the five
total, and does not itself become a new parent tract to subdivide an additional five lots from)
b. Any lot line adjustment, consolidation of multiple lots into one.
B. Minor Subdivision plat application submittal. The applicant shall submit the complete Minor Subdivision
plat application package to the City. The application shall be formatted and packaged per the application
submittal checklist provided by the City and include:
1. Development application form.
2. Application fee.
3. Title commitment. A current title commitment, dated no more than 30 days from the date of minor
subdivision plat application submittal
C. Minor Subdivision plat standards. The plat drawing shall comply with the following standards:
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 39 of 43
1. The plat shall be prepared by or under the direct supervision of a registered land surveyor and
meet applicable State of South Carolina requirements.
2. Except for parcels separated by public rights-of-way, public tracts, or railroads, parcels not
contiguous shall not be included in one plat, nor shall more than one plat be made on the same
sheet. Contiguous parcels owned by different parties may be included on one plat, provided that all
owners join in the dedication and acknowledgment.
3. Lengths shall be shown to the nearest hundredth of a foot and bearings shall be shown in degrees,
minutes and seconds.
4. Bearings, distances and curve data of all perimeter boundary lines shall be indicated outside the
boundary line, not inside, with the lot dimensions.
5. All signatures shall be made in black drawing ink.
6. Title of project.
7. North arrow, scale (not greater than one inch equals 100 feet) and date of preparation.
8. Vicinity map.
9. Legal description.
10. Basis for establishing bearing.
11. Names and addresses of owners, applicant, designers, engineers and surveyors.
12. Total acreage of subdivision.
13. Bearings, distances, chords, radii, central angles and tangent links for the perimeter and all lots,
blocks, rights-of-way and easements.
14. Lot and block numbers, numbered in consecutive order, and square footage or acreage to two
decimal places of each lot or tract.
15. Parcels excepted from inclusion noted as "not included in this subdivision" and the boundary
completely indicated by bearings and distances.
16. Existing rights-of-way in and adjacent to subject property (labeled and dimensioned).
17. Existing and proposed street names for all streets on and adjacent to the property.
18. Existing easements and their type in and adjacent to subject property (labeled and dimensioned).
19. Location and description of monuments:
i. Floodplain boundary with a note regarding source of information (if a floodplain does
not exist on the property, please state this on the plat).
20. Certificates blocks for signatures of owner, surveyor, utility providers, and City approval, as
applicable.
D. Record Minor Subdivision Plat. Five signed copies of the minor subdivision plat shall be delivered to the
City. The applicant will be responsible to record the minor subdivision plat with Beaufort County.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 40 of 43
7.5.7 SITE PLAN
A. Site Plan Purpose. The site plan is a prerequisite to a building permit for all multi-family (excluding
duplexes), commercial, and industrial developments. The site plan shows how the lot will be developed
so that the City can ensure that the site design will be in compliance with the Development Code,
Comprehensive Plan and Civic Master Plan.
B. Site Plan Application. A Site Plan Application shall include the following:
1. Land use application form.
2. Application fee and fee agreement.
3. Site Plan plat — The site plan shall be a minimum of 18 inches by 24 inches and shall provide the
following information:
a. Title of project.
b. North arrow, scale (no greater than one inch equals 50 feet) and date of preparation.
c. Vicinity map.
d. Address of project.
e. Legal description of property.
f. Name, address and phone number of property owner.
g. Name, address and phone number of person or firm responsible for plan.
h. Lot size (square footage).
i. Bearings and distances of all lot lines.
j. Existing and proposed easements and rights-of-way.
k. Existing and proposed paved areas and sidewalks on the site and in the adjacent rights -of-way, all
dimensioned, showing how pedestrians will have access to the site and buildings.
l. Gathering areas for people.
m. Existing and proposed curb cuts on the site and in the adjacent rights -of-way (on both sides of
perimeter streets), all dimensioned.
n. Existing and proposed two-foot contours.
o. Existing waterways on or adjacent to the site.
p. Finished floor elevations for all structures.
q. Footprint (including roof overhangs and eaves, decks, balconies, outside stairs and landings) of all
proposed structures and their use with their dimensions and locations noted with respect to the
property lines.
r. Existing structures and their use.
s. Square footage of the proposed building(s) and the footprint of the proposed building(s).
t. Proposed structure height.
u. For multi-family residential, the number of residential units and bedrooms per unit.
v. Location of proposed signs and lighting.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 41 of 43
w. Specifications for the signs and lights, including type, height and general conformance to the
Code. For commercial and industrial uses, a photometric plan prepared by a qualified electrical
or lighting engineer shall be submitted that depicts all lighting fixtures and the light spread (in
footcandles) of these fixtures across the site to all property boundaries.
x. Proposed traffic controls and striping for parking areas (all lanes, driveways, and parking spaces
must be dimensioned).
y. Trash disposal areas and enclosures including specifications for enclosures.
z. Location and size of existing and proposed water and sewer service connections and tap sizes.
aa. Location and size of water and sewer lines to which the service connections will be or are made.
bb. Location and size of water meter(s).
cc. Location and size of backflow-prevention devices.
dd. Indication of how and where perimeter drain will drain (if one exists).
ee. Location of existing electrical lines and poles on or adjacent to the site.
ff. Location of proposed electrical service connection and meter location.
gg. Location of electric transformer.
hh. Location of all fire hydrants. If none exist on site, note distance and direction of the closest
hydrant adjacent to the site within 500 feet.
ii. Location of detention/retention areas and storm sewer infrastructure with the required drainage
easements.
jj. The distance from the proposed building(s) or structure(s) to adjacent lot lines, easements, and
adjacent structures.
kk. A land use chart (table).
ll. Certificate blocks for signatures of owner, surveyor, utility providers, and City approval, as
applicable.
4. Design standards — Demonstrate in written or graphic form how the proposed structure(s) is
consistent with the design requirements of this code. Provide Exterior elevations of proposed
structures/graphic visual aids. Provide complete building elevations, drawn to scale, with
illustrations of all colors and identifying major materials and cut sheets to be used in the
structure(s). In addition, Staff may require building floor plans, sectional drawings, perspective
drawings, models, and/or computer visualizations when the impacts of a proposal warrant such
information.
5. Certified drainage report — A certified drainage report, including an erosion control study and
plan, as applicable, must be reviewed and approved by the appropriate sanitation district (if
applicable) prior to submittal of the report to the City as part of the site plan application.
6. Final landscape and open space plan — Provide an existing and proposed landscape plan with tree
protection zones and a tree survey, and open space plan consistent with this SectionSections 5 and
7 within this Code.
7. Traffic Impact Analysis — Provide TIA as per requirements of Section 7.3.2.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 42 of 43
C. TRC and Staff Review. Staff and TRC reviews application and prepares comments. Staff and TRC will
review the site plan map to ensure it is consistent with the site plan review criteria. Following the review,
Staff will prepare a written report outlining any changes that the applicant must make before the site plan
can be recommended for public hearing with the Planning Commission. This report will be forwarded to
the applicant.
1. Applicant addresses staff comments. Applicant shall make all necessary changes to the site plan
and resubmit a revised copy to the City.
D. Planning Commission Hearing. The Planning Commission shall hold a public hearing to approve, approve
with conditions or deny the Site Plan as per the following conditions.
1. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting by regular mail to neighboring property owners within 500 feet of the
property per this Code.
2. The Planning Commission shall hold a public hearing on the proposal. The applicant and other
property owners likely to be materially affected by the application shall be given an opportunity to
be heard.
3. Decisions/Findings of Fact: FollowingAt the conclusion of the public meetinghearing, the Planning
Commission may approve, deny, or approve with conditions the application for a Major
Development. No Major Development shall be approved unless the following findings of fact can
beare made:
a. The plan is consistent with the City of Beaufort Comprehensive Plan and Civic Master Plan.
b. The plan complies with all applicable requirements of this Code.
c. There exists adequate infrastructure (transportation and utilities) to support the plan as
proposed.
d. The proposed plan conforms to the character of the neighborhood, considering the location, type
and height of buildings or structures and the type and extent of landscaping on the site.
E. Post approval actions.
1. Building Permit. A building permit shall be issued only when a site plan has been approved.
However, with the approval of the City, an applicant may submit a building permit application
concurrent with the site plan application. Building permits shall not be issued for any development
that is not in conformance with the approved site plan.
2. Phasing and expiration of approval. The site plan shall be effective for a period of three years from
the date of approval, unless stated otherwise in the written site plan approval. Building permits
shall not be issued based on site plans that have an approval date more than three years old. For
multi-phased plans, building permits shall not be issued based on an approval date more than three
years from the date of Phase I approval.
F. Appeals. Any party aggrieved by the decisions of the Planning Commission may appeal to the Circuit Court
within 30 days of the decision.See chapters 7.6 and 9.17
G. Permit Validity. Upon the approval of the Major Development Design application, the applicant shall have
2 years to obtain a Project Permit. Failure to secure a permit for the permitted work within this time shall
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 43 of 43
render the compliance void. Any change to the approved plans that has not been authorized by the
Administrator shall invalidate the design approval, and any subsequent building permits.
H. Permit Extension. The Administrator may grant a one year extensions of this time period upon submittal
by the applicant of sufficient justification for the extension. Extensions shall be submitted at least 1 month
prior to the expiration date.
I. Amendments to approved Site Plans.
1. Minor variations in the location of structures, improvements, or open space areas caused by
engineering or other unforeseen difficulties may be reviewed and approved by the City Staff. Such
changes shall not exceed ten percent of any measurable standard or modify the use, character, or
density of an approved site plan. All plans so modified shall be revised to show the authorized
changes and shall become a part of the permanent records of the City.
2. Changes to approved site plans that exceed the ten percent threshold, or other major
modifications (such as changes in building size or footprint, relocation of access points, changes to
required parking, etc.), shall be considered as a new site plan appli cation. Such amendments shall
require Planning Commission review and approval to become effective. A complete site plan
application shall be prepared and submitted in compliance with the requirements set forth in this
Section.
7.6: APPEALS
See Chapter 9.17 for overall specifications regarding appeals.
PLANNING COMMISSION
February 10th, 2025
Code Amendment Packet
DEVELOPMENT CODE
Chapter 7 – Amendments
as of January 13 th, 2025
(with track changes & comments )
Beaufort, South Carolina, The Beaufort Development Code
7: LAND DEVELOPMENT
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 1 of 44
7: LAND DEVELOPMENT
7.1: IMPROVEMENT REQUIREMENTS
7.1.1 PURPOSE
The purpose of these land development requirements is to:
A. Encourage economically sound and environmentally sensitive development.
B. Assure the timely provision of required streets, utilities, and other facilities and services to new land
developments.
C. Assure the adequate provision of safe and convenient vehicular and pedestrian traffic access and
circulation in and through new land developments.
D. Assure the provision of needed open spaces and building sites in new land developments through the
dedication or reservation of land for recreational, educational, and other public purposes.
E. Assure, in general, the wise and timely development of new areas, in harmony with the Comprehensive
Plan of the city.
F. Encourage new subdivision developments that complement the City's historic development pattern.
G. Promote compact, well-defined, sustainable neighborhoods that enhance the City's character.
H. Create livable neighborhoods that foster a sense of community and reduce dependency on vehicles.
I. Encourage the proper arrangement of new streets in relation to existing or planned streets and
ensuring ensure streets facilitate safe, efficient, and pleasant walking, biking and driving.
7.1.2 APPLICABILITY
A. Unless noted otherwise in this section, all new development projects shall be required to have public
sewer and underground wiring, and shall comply with Section 7.2.3 (Lot Access Standards).
B. All development — with the exception of projects that qualify as Minor Development Design Review or
Minor Subdivision, or are located in the Historic District, and affect less than one whole block face —
are required to install or construct the improvements specified in the Table of Required Improvements
(Section 7.1.3).
C. The applicant shall be responsible for the installation and construction of required improvements
according to the provisions of this Code, except as may otherwise be specifically provided herein or by
city policy or agreement.
D. Approval of a Final Subdivision Plat shall be subject to the applicant having installed the improvements
designated in this article, or having guaranteed (Section 7.1.5), to the satisfaction of the city, the
installation of said improvement.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 2 of 44
7.1.3 TABLE OF REQUIRED IMPROVEMENTS
ZONING DISTRICT
REQUIRED
IMPROVEMENTS3
SECTION
REFERENCE
T1 T3-
S
T3-
N
T4-
HN
T4-
N
T5-
DC
T5-
UC
RMX IC LI MHP
Public Water and
Hydrants
7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Public Sewer 7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Paved Streets1 7.2.4 □ ■ ■ ■ ■ ■ ■ ■ ■
Streetscape2 Appendix C □ ■ ■ □ ■ ■ ■ ■ ■ ■ ■
Underground
Drainage
7.1.3.A □ ■ ■ ■ ■ ■ ■ ■ ■ ■ □
Curb and Gutter Appendix C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Sidewalks 7.2.4.C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Street Trees 7.2.5 □ □ ■ ■ ■ ■ ■ ■ ■ □ □
Street Lights n/a □ □ □ □ ■ ■ ■ ■ ■ ■ ■
Street Signs
(private streets)
n/a ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Underground
Wiring On-Site
7.1.3.C ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Community
Green Space and
Open Space
Space
7.4 □ ■ ■ □ ■ □ ■ ■ ■ □ □
■ required improvements by
district
□ may be required at the discretion of the Planning Commission
based on existing conditions, surrounding context, and street
section (Appendix C)
1 Rear lanes/alleys may be permitted to be paved with pervious material, such as gravel, depending
on the location.
2 Complete street requirements shall be coordinated with the specific street section found in the
regulating plan in Appendix C.
3 For Infill and Redevelopment, as defined in Section 8.3.2, these items [referring to the table of
required provisions} are required to the extent feasible based on existing conditions including roads,
utilities and adjacent buildings.
A. Street Improvements: Land designated for public streets shall be cleared and filled in accordance with
the latest edition of the "South Carolina Standard Specifications for Highway Construction", South
Carolina State Highway Department, or as determined appropriate by the adm inistrator. No land may
be disturbed until a Project Building Permit has been issued (Section 9.5). See Section 5.4 for Tree
Removal Standards. See Section 7.2 for more standards on street location. See Appendix C for Street
Regulating Plan and Design Standards.
B. Water and Sewer Facilities: Water and sewer facilities shall be provided in accordance with the
standard procedures and policies of the water and sewer provider and the South Carolina Department
of Environmental Services (SCDES) and shall be approved by the water and sewer provider.
Commented [CK1]: Should there be sidewalks required,
even if no paved streets are?
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 3 of 44
C. Utility lines: All utility lines within a development site shall be installed underground . The Planning
Commission may approve an exception only in cases where there are existing above-ground lines that
serve the property.
7.1.4 SURVEY AND ENGINEERING
A. Installation of Permanent Reference Points: Permanent reference points shall be placed in accordance
with the following requirements:
1. General Standards: Boundary surveys shall be performed, in accordance with the state minimum
standards published by the State Board of Registration for Professional Engineers and Land
Surveyors, unless more stringent requirements are specified. A minimum of two points in an y
survey must be tied to the state plane coordinate system. The survey may be done on the
horizontal ground distance and tied back to the state plane coordinates.
2. Control Monuments: Vertical control monuments shall be placed in or near the centerline of
pavement of subdivision streets at a minimum of 1 per 4 acres. Where practical, control
monuments shall be placed at points of curvature and points of tangency of curves. The control
monument may be poured on the job or be a concrete marker of the type commonly used in the
area: at least 3 feet long and tapered with a 12-inch long, ¼-inch diameter brass or bronze rod
embedded in the top. Control monuments shall be placed in a cast iron water main valve type
box with a cover flush with the pavement.
3. Property Marker: A steel or wrought iron pipe, rebar, or the equivalent, not less than 0.5 inches
in diameter and at least 24 inches in length shall be set at all property corners and points of
curves, except those located by monuments. They shall be flush with the ground .
4. Accuracy: Land surveys within the city limits shall be Class A surveys, set at an accuracy of at least
1:10000.
7.1.5 IMPROVEMENT GUARANTEES
A. Types Allowed: Prior to approval of a Final Subdivision Plat the applicant shall provide a performance
guarantee to ensure the completion of required improvements within a period of time as agreed upon
by the Administrator and the applicant, and expressed in the guarant ee. Such guarantee may be in the
form of a performance bond, a surety bond, a cash deposit, or a letter of credit. A performance
guarantee shall be posted in the amount of 125% of the total cost of improvements.
1. Performance/Surety Bonds and Letters of Credit: The performance or surety bond, or letter of
credit, shall be in a form acceptable to the city. It shall include a pledge by the bank, insurance
company or other bonding/lending institution that the funds necessary to carry out the terms of
the agreement are guaranteed for payment and will be released only upon receipt of written
instruction from the city.
2. Cash Deposits: If surety is in the form of a cash deposit with the City of Beaufort, proportional
parts thereof shall be refundable in relation to progress payments less retainage, subject to
approval of the city and subject to a minimum deposit balance of 25% of the project cost .
3. Maintenance Guarantees: If the applicant completes all required improvements and complies
with all conditions of the subdivision agreement as determined by the city, the remainder of
monies retained by a financial institution or by the city may be released to the applicant or hi s
successor in title. Prior to release, the applicant shall provide the city, prior to the issuance of any
building permit, a performance bond, a surety bond, or a cash deposit equal to the amount
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 4 of 44
determined by the city that would ensure the repair of any damage to the existing improvements
during the course of any construction, but in no case will the amount of the security be less than
$1,000.00 for each individual building lot. Prior to the issua nce of any certificate of occupancy,
the city shall determine whether or not any breakage or damage has occurred. If no damage to
any off-site improvements has occurred, then the city may release the security to the applicant
or his successor in title. If damages have occurred, they shall be repaired, or the city may draw on
the security before it is released.
7.1.6 EASEMENT AND UTILITY STANDARDS
A. Multiple installations within easements: Easements shall be designed so as to provide efficient
installation of utilities. Public utility installations shall be located as to permit multiple installations
within the easements. The developer will establish final utility grades prior to utility installations.
Public utility easement dedication shall be required with any minor or major subdivision action.
B. Underground utilities: Telephone lines, electric lines, cable television lines and other like utility services
shall be placed underground. The applicant or developer shall be responsible for complying with the
requirements of this Section and shall make the necessary arrangeme nts including any construction or
installation charges with each utility provider for the installation of such underground facilities.
Transformers, switching boxes, meter cabinets, pedestals, ducts and other facilities necessaril y
appurtenant to such underground utilities shall be placed underground or on the surface but not
on utility poles. Screening or fencing is required subject to approval of the City. Electric transmission
and distribution feeder lines and necessary appurtenances thereto may not be placed above ground
unless they are carrying greater than 115 kV. Upon approval of the City, such facilities shall be placed
within easements or rights-of-way provided for particular facilities.
7.2: STREET NETWORK AND DESIGN STANDARDS
7.2.1 STREET INFRASTRUCTURE PLANS
A. Purpose and Intent: The Street Infrastructure Plans (in Appendix C) provide diagrams of the city's
street network and establishes the ideal alignment, hierarchy and design characteristics - including
total right-of-way width, sidewalk and streetscape amenities, parking lanes , travel lanes and other
geometric and urban design details - for all existing streets, proposed streets that have been adopted
as part of an Official Map, and new potential streets in the City of Beaufort.
B. Official Street Network Plan: Pursuant to the authority of S.C. Code 1976 § 6 -7-1210 et seq. (1976), as
amended, the City has previously adopted several Official Maps. An Official Street Network Plan is
incorporated into this Code in order to represent a composite of these previously -adopted Official
Maps.
1. Purpose: This plan represents a composite of all Official Maps, to date, in the City. The map
designates existing or proposed streets or ways within the City that are targeted for creation,
expansion or other improvements. The Official Street Network Plan shall in itially consist of a
series of four (4) separate maps, included in Appendix C, which shall be deemed a part of the
Beaufort Code.
2. Modification: The Official Street Network Plan may be modified or supplemented per the
procedure for Text & Map Amendments and Rezonings (Section 9.16). In addition, the maps will
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 5 of 44
be automatically updated as additional Official Maps are approved per the appropriate process
required by state law.
C. Street Frontage Requirements: The street sections noted in Appendix C show specific street designs
for the purposes of identifying future improvements by both the city and fronting property owners.
These sections depict the ideal arrangement and design of street elements.
1. Applicability: For any project that is considered part of a Major Subdivision )Site Plan, or requires
a Certificate of Appropriateness, as a Major project type (Section 9.10.2 A.2.), and/or which
affects one whole block face, the fronting property owner shall install all prescribed streetscape
improvements as part of the development project. . The installation of street frontage
improvements is required prior toshall be a condition of final plat approval for major
subdivisions, and certificates Certificates of occupancy Occupancy for Site Plans.
a. Exception: If similar elements as prescribed in the street section exist — e.g., on-street
parking, sidewalk, tree plantings — the requirement to install the streetscape element(s)
shall be waived if those items meet the intent of the prescribed street section, even if the
existing items do not meet the exact requirements of that street section. Example
Scenarios: If a street section prescribes a 5-foot sidewalk, but a 4-foot sidewalk already
exists, the existing sidewalk will satisfy the sidewalk requir ement. However, if the street
section requires a 5-foot planting strip between the curb and the sidewalk, and the 4 -foot
sidewalk is directly adjacent to the curb, this would not satisfy the intent of the street
section and would need to be reconstructed p er the prescribed standards.
2. Scope of Improvements: Street frontage improvements shall be installed along the entire
frontage of the property, to the centerline of the street, or if a multi -lane street, the affected
lane, at the sole cost of the applicant as directed by the Codes Administrator. The Codes
Administrator may permit modification of street improvement standards where the required
street improvements are not in the opinion of the Codes Administrator, roughly proportionate to
the impact, type, scale and cost of the proposed development action.
a. Street frontage improvements may include the following: curb, gutter, sidewalk, storm
drainage, street lighting, traffic signal equipment, utility installation. extension, or relocation,
landscaping strip, street trees and landscaping, irrigation, str eet widening, pavement overlay or
reconstruction, and channelization.
b. In addition to required frontage improvements, the applicant shall provide ramps from the
new sidewalk or walkway to the existing shoulder, across streets and pavement and
channelization tapering back to the existing pavement and channelization as requ ired to address
safety concerns.
D. Dedication of Right-of-Way:
1. Dedication of Right-of-Way. In the case of a street section adopted as part of an Official Map,
where the width of the existing right-of-way is insufficient to install the prescribed street
section, the fronting property owner shall be required to reserve the appropriate amount of
right-of-way (as measured from the centerline of the existing street). The future right-of-way
shall conform to all of the street network requirements of Section 7.2.2. Where a new right-of-
way that is not shown in the street regulating plan, is required a s part of a new development, it
shall be designed with appropriate elements based on its proposed location and zoning district.
(See Appendix C).
a. In the case of a street section that is not part of an Official Map, where the width of the
existing right-of-way is insufficient to install the prescribed street section, the property
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 6 of 44
owner shall reserve the appropriate amount of right-of-way to complete the desired street
section. If the owner c dedicates and installs the complete right-of-way, the cost of the
improvements may be compensated - see Section 7.2.1 DE.
b. Where a future right-of-way is identified on an Official Map, and thus represented on the
Official Street Network Plan— these are indicated as "New Adopted Streets" — new
development shall reserve this area for the new street in the future. If access is ne eded to
the site in that location, the street shall be constructed in the general location shown.
c. Exceptions and Alternatives:
i. Where available right-of-way — due to existing structures and topographic conditions
limited to wetlands, specimen and landmark trees, — do not functionally permit the
full section to be constructed, the Administrator may adjust the required street
section.
E. Compensation: When a project is required to make off-site improvements within the existing right -of-
way, dedicate and/or improve a street with insufficient right -of-way, or install a new street (be it
public or private) per the requirements in Section C. above, compens ation may be available. To the
extent that the City has the authority and the ability, the Traffic Impact fee for the project shall be
reduced by the assessed value of the dedicated land and/or construction cost of the right -of-way
improvement. This may be done either as a direct reduction, rebate, or reimbursement of fees . (Ord.
No. O-14-23, 9-26-2023)
7.2.2 STREET NETWORK REQUIREMENTS
A. Continuation of Adjoining Street System: The proposed street layout shall be coordinated with the
street system of the surrounding area to form an interconnected street pattern, formalized by a
platted public access easement. Adequate street connectivity shall be assessed by the TRC, based on
the ability of the proposed alignments to:
1. Permit multiple routes between origin and destination points;
2. Diffuse traffic; and
3. Shorten walking distances.
B. Block Sizes: Blocks shall be compact so that they are comfortably walkable and appropriate for their
context.
1. In T3-S zones, block sizes are flexible, but the perimeter shall not exceed 2,640 linear feet (½
mile). An average block perimeter less than 2,000 feet is preferred.
2. In T3-N zones, block sizes are flexible, but the perimeter shall not exceed 1,700 linear feet (⅓
mile). An average block perimeter less than 1,500 feet is preferred.
3. In T4, and T5 and RMX zones , blocks shall be no more than 400 feet on any side. An average
block length of 250—300 feet is preferred. The block perimeter shall not exceed 1,320 linear feet
(¼-mile).
4. Exceptions may be made for natural elements such as wetlands, trees, topography, and cultural
resources, to be incorporated into the site design.
C. Street Stubs: New developments shall connect to any existing street stubs from adjacent properties
and stub to all adjacent properties.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/14/25
Chapter 7 – Land Development
Page 7 of 44
1. Exemptions: Street stubs shall not be required where the Planning Commission finds the
conditions listed below would prevent connections:
a. Topographical conditions (pre-development slopes of 18% or greater).
b. Environmental conditions (marshes, floodplains, specimen and landmark trees, etc.).
c. Property shape.
d. Property accessibility (existing platted subdivision with no stubs).
e. Incompatible adjacent land uses.
2. Location: Where multiple connection opportunities exist, street stub connections shall be
prioritized in the site design as follows:
a. Adjacent parcels 20 acres or greater in size.
b. Adjacent parcels that abut or are traversed by existing or proposed streets.
c. Where the Street Network Diagram recommends a street connection (indicated as a
proposed street).
3. Design:
a. Stub streets and streets intended for extension during future phases shall be constructed
to extend to the property line for constructability to adjoining property.
b. Stub streets shall not exceed 150 feet in length without a paved turnaround (permanent or
temporary).
c. Disclosure: The Final Subdivision Plat shall be recorded depicting that future connection is
required at any stub streets and streets intended for extension during future phases. A
clearly visible street sign shall be erected at the end of the stub street stating that the
street is planned to connect to a future street.
D. Cul-de-sacs and Dead-end Streets: Dead-end streets and cul-de-sacs are prohibited, except for only
the T-3 and LI zoning districts, where cul-de-sacs or other turn-arounds may be approved by the
Planning Commission. Compliance with the following standards must be met in all circumstances:
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/14/25
Chapter 7 – Land Development
Page 8 of 44
1. Permanent dead-end streets shall be no longer than 300 feet and shall be provided with a turn, -
around such as a cul-de-sac or close.
2. Temporary dead-end streets shall be provided with a temporary turnaround area which shall be
designed considering traffic usage, maintenance, and removal.
3. Alternative design solutions, such as a close (first preference), or a loop road cul -de-sac (second
preference) are preferable to a typical cul-de-sac.
4. Cul-de-sacs shall have a minimum right-of-way radius of 50 feet and minimum paved radius of 40
feet. When ample radii exist, cul-de-sacs shall contain a central planted median.
5. Whenever cul-de-sac roads are created, at least one pedestrian access easement shall be
provided, to the extent practicable, between each cul -de-sac head or road turnaround and the
sidewalk system of the closest adjacent road or pedestrian pathway. The access easement shall
be direct with a minimum width of 12 feet.
E. Gated Streets: New gated streets are prohibited.
1. Exceptions: they They may be permitted, at the discretion of the Planning Commission, in T3 -S
zoning districts where connection to the existing street grid is not practicable due to topography
or existing surrounding conditions.
2. They may be permitted by the Planning Commission when the access proposed to be gated is an
alley or rear lane and is not the primary building frontage.
F. Street Naming and Renaming: Proposed Street names and number systems will be reviewed by the
administrator and the Beaufort County Emergency Management Department. No duplicate/similar
names are allowed, as determined by these agencies.
G. Reserved Strips Prohibited: Reserved strips at the terminus of a new street shall be prohibited.
7.2.3 LOT ACCESS STANDARDS
A. Applicability: Any development that requires an access point (rear alley/lane or driveway) for purposes
of ingress and/or egress shall be subject to the provisions of this section. All new accesses must be
approved by the appropriate permitting authority. Access points may not be installed on undeveloped
property less than 2 acres.
B. Maximum Number: For single-family and two- and three-family dwellings, only one driveway shall be
permitted per lot. In T3-S, circular driveways may be permitted on lots greater than 100 feet in width,
where no sidewalk exists. Driveways may only be installed when rear a ccess is not possible or required.
For double frontage lots, one curb cut per street may be permitted. For all other building types, the
maximum number of driveways allowed for any property is outlined in the table below.
FRONTAGE
WIDTH
MAXIMUM PERMITTED DRIVEWAYS (CURB CUTS)
PER STREET FRONTAGE
up to 150 feet 1
150 feet or more 2 - Additional driveways (in excess of 2) shall be permitted only after the applicant
successfully demonstrates the necessity for such additional driveways, as determined by
the appropriate Design Review Body. Along arterial roads and thoroughfares, such
additional driveways shall be "right-in, right-out" driveways only.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 9 of 44
C. Location and Spacing:
1. Street Intersection: No curb or other access point shall be located closer than:
a. 20 feet from the intersecting point of the 2 street right -of-way property lines involved (or
such lines extended in case of a rounded corner);
b. 25 feet from the intersection of the 2 curb lines involved (or such lines extended in case of
a rounded corner), whichever is the least restrictive.
2. Spacing: All access points shall have a minimum separation from certain features as follows:
FEATURE MINIMUM SEPARATION1
Adjacent Property Line (does not apply to shared or
joint-use driveways)
0 ft
Another Curb Cut (driveway or street intersection) on
all roads except Major Thoroughfares
25 ft
Major Thoroughfares — defined as streets with the
Street Section designation of Major Thoroughfare, or
the Robert Smalls Parkway, Sea Island Parkway/Lady's
Island Drive, or Boundary Street Specific Street Section
— Another Curb Cut (driveway or street intersection)
Depends on Posted Speed Limit
< 35 mph 100 ft
35 mph 200 ft
40 mph 250 ft
45 mph2 300 ft
50 mph2 400 ft
55+ mph2 500 ft
1 Minimum separation is measured from centerline
2 On Robert Smalls Parkway (Hwy 170) west of Parris Island Gateway, a minimum of 500 ft. separation distance
is required
3. Corner Lots: Access points on corner lots shall be from the side (or secondary) street, unless a
shared curb cut on the main thoroughfare is existing or proposed.
4. Access to Lots from Major Thoroughfares: Driveways serving individual residential lots shall not
have direct access onto streets identified as Major Thoroughfares — as identified on the second
row of the chart in Section 7.2.3 C.2. — unless no alternative means of access, such as alleys or
parallel access roads, exists, and it is unreasonable or impractical to require an alternative means
of access.
5. Shared Access: See Section 5.7.7 C.
6. Rear Access Required/No Front Access: For lots developed in the transect zones of T-3N, T-4, T-5
UC, all new access points shall be from a rear alley and/or road, except for lots within the historic
district. Exemptions to allow front loaded access points where connection to the existing street
grid is not practicable due to topography or existing surrounding conditions shall be at discretion
of the Planning Commission with approval of major subdivisions, and the Codes Administrator for
individual lots.
Beaufort, South Carolina, The Beaufort Development Code Last revised: 1/13/25
Chapter 7 – Land Development
Page 10 of 44
D. Size:
1. Alleys: Alley pavement width may be a maximum of 24 feet wide for two -way traffic and 16 feet
wide for one-way traffic. For more design standards, see Appendix C.
2. Driveways:
a. Driveways for single-family and 2- and 3-family uses may not exceed 12 feet wide, except in
T3-S district, where they may be a maximum of 20 feet wide.
b. Tandem Parking: Tandem parking is allowed in all zones for all residential uses if:
i. Both tandem parking spaces satisfy the parking requirement of one residential
unit; and
ii. Neither of the tandem parking spaces shall be for required accessible parking
spaces.
c. Driveways to other uses and parking areas shall not exceed 24 feet in width for 2 -way
drives or 12 feet in width for one-way drives, except those with turn lanes required by the
city or SCDOT.
E. Access to Lots from Alleys/Rear Lanes:
1. Specific to T3-N, T4, and T5 districts: Alleys/rear lanes shall be provided along the rear property
lines of lots as follows:
a. In new subdivisions greater than 1 acre, alleys shall be provided for newly created lots that
meet any of the following criteria:
i. The lots are part of a block face with an average lot width of 60 feet or less at
the building setback line (excluding lots on cul -de-sacs).
ii. The lots are arranged around a Common Open Space.
iii. The lots front a collector or arterial road, regardless of the average lot width.
iv. The lots are intended for multi-family dwellings and/or mixed-use buildings.
b. In infill situations, the same standards apply as specified above, but only for developments
that include 4 or more contiguous lots, where one lot is a corner lot. In the Historic District,
the standards apply only to the Beaufort Conservation District; the requirement may be
waived at the discretion of the Historic Review Board.
F. Specific to Commercial Developments and Subdivisions:
1. Out-parcels: Out-parcels for shopping, office, or industrial centers shall be limited to internal
access to the center, unless otherwise approved as part of a master development plan. All
driveways shall be paved from the road to the property line.
2. Abandoned Driveways: Abandoned driveways (i.e., curb cuts that are no longer used for
vehicular access and are physically blocked by structures) shall be closed, and the area shall be
restored to the typical cross section of the right -of-way.
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 11 of 44
7.2.4 STREET DESIGN STANDARDS
A. Street Section Design: The elements and widths of all proposed streets shall be in conformity with the
appropriate street section designated in the Street Regulating Plan (Section 7.2.1 and Appendix C).
B. Traffic Control and Signs: The type and location of traffic control devices used on City streets must be
approved by City Staff, and traffic control on private Streets shall be included and approved as part of
the major subdivision or site plan. Traffic signals should be used where warranted, but alternate traffic
control such as roundabouts should be considered first. When it can be shown that a particular zoning
action, master plan, or development plan impacts the street system to a point that a traffi c signal is
warranted according to Manual on Uniform Traffic Control Devices (MUTCD) and approved by City
Staff, the developer shall be responsible for all or a portion of the signal installation.
C. Sidewalks/Multi-use Paths: Where required per the Street Section in Appendix C, all sidewalks or
multi-use paths must be constructed concurrently with the street, or, if the street is already
constructed, prior to acceptance of any improvements. Exceptions to, the requirement to in stall a
sidewalk may be granted by the Planning Commission if:
1. Alternative pedestrian paths/bikeways have been or will be provided outside of the normal right -
of-way.
2. There are unusual topographic, vegetative, or other natural conditions to the extent that strict
adherence to said requirements would be unreasonable and not consistent with the purposes
and goals of this Code.
D. Utility Easements: Utility easements which require a width of 8 feet or larger shall be located in rear
alleys or along the side or rear lot lines. Special permission to install utility easements in other locations
may be requested by the utility companies and is subject to approval by the appropriate Design Review
Body.
E. Special Consideration to Protected Resources and other Natural Features: Street layout and design
shall give additional consideration to preserving protected resources and enabling natural areas to be
protected or minimally disturbed. Where streets are built in areas that have protected resources or
natural features, all utilities shall be placed within the street right-of-way and under the street in order
to avoid additional destruction of the natural features.
7.2.5 STREET TREE PLANTING REQUIREMENTS
A. Planting Areas: Planting strips and tree wells shall be established in accordance with the width and
plantings designated in the appropriate Street Section of the Street Regulating Plan (7.2.1 and
Appendix C).
B. Location and Number: Street trees shall be planted in the location and per the spacing specified for the
corresponding street classification in Appendix C. However, in specific cases, where due to the location
of utilities or other site constraints exist, the Planning Commission may allow street trees to be planted
on private property adjacent to the right -of-way.
C. Tree Species: Overstory and understory trees as prescribed in this section reference Appendix A.2
(Recommended Trees and Shrubs).
D. Minimum Tree Size: At the time of planting, young trees should be 2.5 inch caliper, with the lower side
of the crown a minimum of 6 feet above grade to avoid hazards to pedestrians.
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 12 of 44
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 13 of 44
7.3: STREET ENGINEERING STANDARDS
7.3.1 STREET DESIGN, CERTIFICATION, AND CONSTRUCTION SPECIFICATIONS
A. Design Drawings and Certification: Professional engineers, registered in the state, shall prepare plans,
profiles, cross sections, and specifications for all subdivision roads and streets. The engineers shall
certify roads/streets are built to comply with the approved plans and specificati ons. Cross sections
shall be developed every 100 feet at intersections and break points in grade. Cross sections shall show
the complete rights-of-way including travel lanes, shoulders, ditches, curb and gutter, and sid ewalks
and utility locations, as applicable.
B. Construction Specifications for Paved Streets: Street construction specifications for paved streets shall
be in compliance with the South Carolina Department of Transportation Standards.
7.3.2 TRAFFIC IMPACT ANALYSIS
A. Applicability: A "traffic impact analysis" (TIA) shall be required for any development that is shown — in
the most recent Institute of Transportation Engineers (ITE) Trip Generation Manual or any alternative ,
approved at the discretion of the Planning Commission or the TRC, or by the engineering department
— to generate more than 50 trips during the peak hour on the adjacent street(s).
1. A second phase, second subdivision, or addition that generates traffic beyond this threshold
when taken as a whole shall also require a TIA, even though that development does not qualify
on its own.
2. A use shall not be changed without conducting a new TIA if the new use would generate traffic
beyond the 50 trips during peak hour threshold above. The Planning Commission may waive this
requirement.
3. Exception: Development — except for Educational Facilities with greater than 100 students — on
lots included in the Boundary Street Master Plan, adopted on August 28, 2006, and lots in the
area bounded by Calhoun Street, Carteret Street, Bay Street, and Ribaut Road, and lots zoned
Limited Industrial (LI), shall not be subject to the requirements of this section.
B. Traffic Access Management Analysis: As part of the TIA process, the proposed development shall have
an "access analysis" undertaken by the administrator to ensure that sufficient access to all proposed
developments and subdivisions is achieved.
1. The standards in the South Carolina Department of Transportation's "Access and Roadside
Management Standards Manual" (a.k.a. ARMS Manual) shall serve as a guide for this analysis,
which shall include identification of the following:
a. Access improvements that the applicant must install at his or her expense, such as
deceleration lanes;
b. The location of any curb cuts based on, but not limited to, sight distances, existing roadway
infrastructure, opposing driveways locations, and shared access;
c. Requirements for adequate driveway design, including, but not limited to, turning radius
and stacking distance.
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 14 of 44
2. The access requirements approved by the Planning Commission or the TRC shall be incorporated
on development or subdivision plans prior to their approval.
3. If an applicant is required to provide site-related traffic improvements, the cost of implementing
such improvements shall be borne by the applicant, and no such costs shall be eligible for a credit
or offset from any transportation impact fees unless spec ifically permitted by the Development
Fee Procedures - Beaufort County Code of Ordinances, Chapter 82, Article VII or most recent
version.
C. Traffic Impact Analysis Plan Preparation:
1. The TIA shall be conducted by an engineer registered in South Carolina who is experienced in the
conduct of traffic analysis.
2. Prior to beginning the TIA, the applicant shall supply the city with the following:
a. A written narrative describing the proposed land use(s), size, and projected opening date of
the project and all subsequent phases.
b. A site location map showing surrounding development within a one -half mile of the
property under development consideration.
c. A proposed site plan or preliminary subdivision plat illustrating access to public or private
roads and connectivity to other contiguous developments.
3. Prior to beginning the TIA, the applicant shall receive, in writing, the parameters to be followed in
the study, including the directional split of driveway traffic, trip distribution, background traffic
growth rate, previously approved but not complete d projects, and the intersections to be
analyzed, along with any associated turning movement counts that are available or discussed and
approved by the TRC.
4. To review the TIA, the Planning Commission and TRC will require current trip generation
information, available information on land use, travel patterns, and traffic conditions, and shall
consult with the SCDOT.
D. Plan Contents:
Background information Requirement
List of all nonexistent transportation improvements
assumed in the analysis
Required
Map of site location, description of the parcel,
general terrain features, and location within the
jurisdiction and region.
Required
Description of geographic scope/ limits of study
area.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed .
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 15 of 44
Plan at an engineering scale of the existing and
proposed site uses.
Required
Description and map or diagram of nearby uses,
including parcel zoning.
Required
Description and map or diagram of existing
roadways.
Required
Description and map or diagram of programmed
improvements to roadways, intersections, and
other transportation facilities within the study
area.
Required
Analysis of Existing Conditions
Collected daily and peak hour of the generator
traffic volumes, tabulated and presented on
diagrams with counts provided in an appendix.
Required
Analyses for intersections and roadways identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for
each lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments, tabulated and
presented on diagrams, if facilities or routes exist.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed –
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Incorporation of all Traffic Impact Analysis studies
and Trip Generation from approved developments
or vested unbuilt developments within mile radius
at time of proposal.
Required (submitted for any jurisdiction, including
the Town of Port Royal, and County of Beaufort)
Speed Study If requested by City
Crash history near site If requested by City
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 16 of 44
Sight distance If requested by City
Analysis of Future Conditions without Development
Description of and justification for the method and
assumptions used to forecast future traffic volumes.
Required
Analyses for intersections and roadways as identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for each
lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments tabulated and
presented on diagrams, if facilities or routes exist or
are planned.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed .
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Trip Generation
Site trip generation, with tabulated data, broken out
by analysis year for multi- phase developments, and
including justification for deviations from ITE rates, if
appropriate.
Required
Description and justification of internal capture
reductions for mixed use developments and pass -by
trip reductions, if appropriate, including table of
calculations used.
Required
1. Phased Developments: All phases of a development are subject to review, and all traffic plans for
the entire development shall be integrated with the overall traffic analysis. A TIA for a specific
phase of development shall be applicable to the phase of development under imme diate review.
However, each phase of development shall expand and provide detailed analysis at the
development plan stage beyond the estimates provided for at the concept plan or master plan
stage.
2. Infrastructure Analysis: The adequacy of the roads that the development will be accessed from
shall be assessed in the TIA. Recommendations for improvements shall be made. The relative
share of the capacity created shall be broken down as follows: development share, other
developments' share, any existing overcapacity, and capacity available for future growth.
3. Required Elements of the TIA:
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 17 of 44
a. A site plan or subdivision plat identifying accesses to and from existing or proposed streets
and intersections, along with all opposing intersections across adjacent streets.
b. Description of the proposed development, including the type and intensity of proposed
land use(s) including, but not limited to: the number of residential units by type, the
number of existing and proposed lots, the type of proposed nonresidential devel opment
and the amount of such development measured by gross floor area or other appropriate
unit of measurement, the general size and type of accessory development or facilities, and,
for nonresidential development, adequate information to identify the app ropriate land use
category for trip generation.
c. Projected vehicular trips to and from the completed development during a.m. and p.m.
peak hour — trip rates shall be taken from ITE Manual or alternatively, an applicant may
elect to perform, at his own expense, a "trip generation study" which may be su bmitted as
part of the traffic impact analysis plan. Such trip generation study shall be subject to the
review and verification of the TRC and engineer. For proposed uses not specifically listed in
the ITE Manual, and for which a trip generation study has not been performed, the
designated engineer(s) shall determine the most appropriate trip generation rate. The TRC
shall make the determination of the appropriate trip generation rate, from whatever the
source. The percentage of pass-by trips, if used in the plan, shall be included, as well as the
source of this information.
d. A written narrative setting forth the assumptions upon which any projection was made in
developing the traffic impact analysis plan shall be included in the analysis. If the
assumptions are derived from the ITE Manual, the materials shall be referenced and
properly cited. If the assumptions are not from the ITE Manual, appropriate excerpts from
other reliable transportation planning resources shall be included in the study, and reasons
underlying the assumptions shall be stated in the narrative.
e. The TIA shall review access to the site. The adequacy of the entrance design shall be
evaluated, and recommendations made on acceleration and deceleration lanes, left -turn
lanes, or signalizations shall be part of the TIA. Educational facilities shall include pick -up
and drop-off plans and analysis of the impact on the surrounding streets and interse ctions.
f. The TIA shall review the number and types of curb cuts that are permitted. In particular,
the TIA shall assess the connection of the property to adjoining properties. Where the use,
scale of development, or size of adjoining properties is such that trip s would be anticipated
between the proposed use and the other properties, the TIA shall make recommendation
on interconnections. The TIA shall recommend interconnections to provide a smooth flow
of traffic between uses along arterials and collector roads t o ensure that as much traffic as
possible uses secondary roads, rather than major roads, for short trips.
g. The TIA shall be based on intersection analysis procedures for signalized intersections as
identified in the most current edition transportation research board's highway capacity
manual, and/or the last update that analyses and emulates these procedures by means of
computer software, if available. The results of any required analysis/computer analysis
shall, at a minimum, indicate compliance or variance from the Traffic Goals (Section 7.3.3
M).
h. The intersections that must be analyzed in the study are identified as:
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 18 of 44
i. Any intersection that serves as a development's point of access. This will
include intersections of public and/or private roads with major arterials, and
driveways offering direct access.
ii. The first major intersection as identified by the city engineer on both side of
the development's point of access.
iii. Other intersections on major arterials if development generates more than 50
a.m. or p.m. peak hour trips to that intersection, or if the intersection's level of
service or demand is significantly impacted by site related traffic.
iv. Unsignalized intersections and access drives — these shall be considered if
development impacts are anticipated. The plan must include the results of an
analysis of the operating conditions of critical intersections and/or all
intersections identified in the concept plan. The analysis shall reflect the
projected condition of these intersections and movements, based on the
scheduled opening date of the development. Other phases of the development,
if they can be reasonably determined, shall be considered as well.
E. Mitigation Plan Required: If the initial analysis indicates that the city's adopted Traffic Service Level
Goals (Section 7.3.2 M.) will not be met, a mitigation plan must be prepared, based on additional
analysis. The mitigation plan must show how the city's Traffic Service Level Goals are addressed as
mitigated. Applicants will be responsible for mitigating the traffic impacts at any intersection affected
by a proposed development.
1. If a traffic signal is recommended, the TIA shall provide information that:
a. Clearly indicates the need for a traffic signal.
b. Assesses the ability of other existing, planned, or proposed public roads to accommodate
the new traffic at a location other than the main highway in the vicinity of the proposed
development.
c. Describes in detail how a specific development will affect the study area transportation
system.
d. Provides documentation of appropriate South Carolina Manual of Uniform Traffic Control
Devices signal warrant satisfaction.
e. Gives design geometry of the private road that is consistent with that of public road
intersections, including curbs, appropriate lane widths, pavement markings, and vertical
alignment. Other roadway factors to be considered include, but are not limited to, speed,
type of highway, grades, sight distance, existing level of service, conflicting accesses, and
the effect of future traffic signal systems.
f. Provides an approach-throat length for the road to ensure the movement of vehicles
entering the site will not be impeded by conditions within the development and ensure
that all signal-spacing requirements are adequately met.
2. The desirable spacing of signalized intersections on principal arterials is the SCDOT, county, or
city standards. The TRC may recommend to SCDOT the installation of a traffic signal at locations
where, using SCDOT standards, spacing is inappropriate due to topography, existing or proposed
road layout, documented accident history, unique physical constraints, existing or proposed land
use patterns, or requirements to achieve specific objectives for highway segment designations, as
Beaufort, South Carolina, The Beaufort Development Code
Last revised: 1/13/25
Chapter 7 – Land Development
Page 19 of 44
shown in any locally adopted land use or transportation plan, approved city or county
transportation plan, or approved transportation policy.
3. Signal spacing concerns may be ameliorated in the following ways:
a. A proposed private road that may otherwise be considered for the installation of a traffic
signal may be replaced by an on-site route or a frontage road that directs traffic to or from
a nearby public road.
b. A private road that is being considered for traffic signal installation may be required to
connect to the existing or planned local road system to allow uses of surrounding
properties.
c. An existing or proposed intersection may be relocated.
d. A shared private road may be required to serve the needs of the multiple properties.
4. A traffic signal progression analysis is required if the proposed location is closer than the SCDOT
standards, given the presence of existing signals or the possible existence of identified future
signals proposed as part of a highway signal system. A t raffic signal progression analysis for all
new, revised, or planned traffic signal systems on state highways shall be performed using
methods, models, computer software, data sources, roadway segment length, and assumptions
approved by the TRC. The roadway segment, analyzed to the extent possible, shall include all
traffic signals in the existing or future traffic signal system. The progression analysis shall:
a. Demonstrate acceptable existing and future traffic signal systems operation that may
include the morning peak, evening peak, midday period, and other appropriate time period
during any day of the week, adjusted for peak season, for cycle lengths and tra vel speeds
approved by the TRC.
b. Provide for a progressed traffic band speed no more than 5 mph (8 km/h) below the
existing posted speed for both directions of travel during the off -peak periods, nor more
than 10 mph (16 km/h) below the existing posted speed during peak periods. Approv al by
the TRC is required where speeds deviate more than the above.
c. Demonstrate that sufficient vehicle storage is available at all locations within the traffic
signal system without encroaching on the functional boundaries of adjacent lanes and
signalized intersections. The functional bo
Text truncated. Open the original for the full document.