Planning Commission Worksession (Agenda Packet)
City of Beaufort · Beaufort County · meeting of Jan 7, 2025 · Agenda packets
Open the original document More from City of Beaufort
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF BEAUFORT
PLANNING COMMISSION
WORKSESSION AGENDA
1911 Boundary Street, Beaufort, SC 29902
Phone: 843-525-7011 ~ Fax: 843-986-5606
Tuesday, January 7, 2025, 1:00 P.M.
City Hall, Executive Conference Room, 2nd Floor – 1911 Boundary Street, Beaufort, SC
STATEMENT OF MEDIA NOTIFICATION: "In accordance with South Carolina Code of Laws,
1976, Section 30-4-80(d), as amended, all local media were duly notified of the time, date, place and agenda of
this meeting."
I. Public Comment
II. Discussion of Final Chapter 7 Standards
III. Discussion of Chapters 9 Development Review Standards (2 hours)
IV. Public Comment
V. Adjournment
Note: If you have special needs due to a physical challenge, please call Julie Bachety at (843) 525-7011.
DEVELOPMENT CODE
CHAPTER 7 AMENDMENTS
(with track changes)
Beaufort, South Carolina, The Beaufort Development Code
7: LAND DEVELOPMENT
Beaufort, South Carolina, The Beaufort Development Code Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 1 of 43
7: LAND DEVELOPMENT
7.1: IMPROVEMENT REQUIREMENTS
7.1.1 PURPOSE
The purpose of these land development requirements is to:
A. Encourage economically sound and environmentally sensitive development.
B. Assure the timely provision of required streets, utilities, and other facilities and services to new land
developments.
C. Assure the adequate provision of safe and convenient vehicular and pedestrian traffic access and
circulation in and through new land developments.
D. Assure the provision of needed open spaces and building sites in new land developments through the
dedication or reservation of land for recreational, educational, and other public purposes.
E. Assure, in general, the wise and timely development of new areas, in harmony with the Comprehensive
Plan of the city.
F. Encourage new subdivision developments that complement the City's historic development pattern.
G. Promote compact, well-defined, sustainable neighborhoods that enhance the City's character.
H. Create livable neighborhoods that foster a sense of community and reduce dependency on vehicles.
I. Encourage the proper arrangement of new streets in relation to existing or planned streets and
ensuring ensure streets facilitate safe, efficient, and pleasant walking, biking and driving.
7.1.2 APPLICABILITY
A. Unless noted otherwise in this section, all new development projects shall be required to have public
sewer and underground wiring, and shall comply with Section 7.2.3 (Lot Access Standards).
B. All development — with the exception of projects that qualify as Minor Development Design Review or
Minor Subdivision, or are located in the Historic District, and affect less than one whole block face —
are required to install or construct the improvements specified in the Table of Required Improvements
(Section 7.1.3).
C. The applicant shall be responsible for the installation and construction of required improvements
according to the provisions of this Code, except as may otherwise be specifically provided herein or by
city policy or agreement.
D. Approval of a Final Subdivision Plat shall be subject to the applicant having installed the improvements
designated in this article, or having guaranteed (Section 7.1.5), to the satisfaction of the city, the
installation of said improvement.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 2 of 43
7.1.3 TABLE OF REQUIRED IMPROVEMENTS
ZONING DISTRICT
REQUIRED
IMPROVEMENTS3
SECTION
REFERENCE
T1 T3-
S
T3-
N
T4-
HN
T4-
N
T5-
DC
T5-
UC
RMX IC LI MHP
Public Water and
Hydrants
7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Public Sewer 7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Paved Streets1 7.2.4 □ ■ ■ ■ ■ ■ ■ ■ ■
Streetscape2 Appendix C □ ■ ■ □ ■ ■ ■ ■ ■ ■ ■
Underground
Drainage
7.1.3.A □ ■ ■ ■ ■ ■ ■ ■ ■ ■ □
Curb and Gutter Appendix C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Sidewalks 7.2.4.C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Street Trees 7.2.5 □ □ ■ ■ ■ ■ ■ ■ ■ □ □
Street Lights n/a □ □ □ □ ■ ■ ■ ■ ■ ■ ■
Street Signs
(private streets)
n/a ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Underground
Wiring On-Site
7.1.3.C ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Community
Green Space and
Open Space
Space
7.4 □ ■ ■ □ ■ □ ■ ■ ■ □ □
■ required improvements by
district
□ may be required at the discretion of the Planning Commission
based on existing conditions, surrounding context, and street
section (Appendix C)
1 Rear lanes/alleys may be permitted to be paved with pervious material, such as gravel, depending
on the location.
2 Complete street requirements shall be coordinated with the specific street section found in the
regulating plan in Appendix C.
3 For Infill and Redevelopment, as defined in Section 8.3.2, these items [referring to the table of
required provisions} are required to the extent feasible based on existing conditions including roads,
utilities and adjacent buildings.
A. Street Improvements: Land designated for public streets shall be cleared and filled in accordance with
the latest edition of the "South Carolina Standard Specifications for Highway Construction", South
Carolina State Highway Department, or as determined appropriate by the adm inistrator. No land may
be disturbed until a Project Permit has been issued (Section 9.5). See Section 5.4 for Tree Removal
Standards. See Section 7.2 for more standards on street location. See Appendix C for Street Regulating
Plan and Design Standards.
B. Water and Sewer Facilities: Water and sewer facilities shall be provided in accordance with the
standard procedures and policies of the water and sewer provider and the South Carolina Department
of Environmental Services (SCDES) and shall be approved by the water and sewer provider.
Commented [CK1]: Should there be sidewalks required,
even if no paved streets are?
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 3 of 43
C. Utility lines: All utility lines within a development site shall be installed underground . The Planning
Commission may approve an exception only in cases where there are existing above-ground lines that
serve the property.
7.1.4 SURVEY AND ENGINEERING
A. Installation of Permanent Reference Points: Permanent reference points shall be placed in accordance
with the following requirements:
1. General Standards: Boundary surveys shall be performed, in accordance with the state minimum
standards published by the State Board of Registration for Professional Engineers and Land
Surveyors, unless more stringent requirements are specified. A minimum of two points in an y
survey must be tied to the state plane coordinate system. The survey may be done on the
horizontal ground distance and tied back to the state plane coordinates.
2. Control Monuments: Vertical control monuments shall be placed in or near the centerline of
pavement of subdivision streets at a minimum of 1 per 4 acres. Where practical, control
monuments shall be placed at points of curvature and points of tangency of curves. The control
monument may be poured on the job or be a concrete marker of the type commonly used in the
area: at least 3 feet long and tapered with a 12-inch long, ¼-inch diameter brass or bronze rod
embedded in the top. Control monuments shall be placed in a cast iron water main valve type
box with a cover flush with the pavement.
3. Property Marker: A steel or wrought iron pipe, rebar, or the equivalent, not less than 0.5 inches
in diameter and at least 24 inches in length shall be set at all property corners and points of
curves, except those located by monuments. They shall be flush with the ground .
4. Accuracy: Land surveys within the city limits shall be Class A surveys, set at an accuracy of at least
1:10000.
7.1.5 IMPROVEMENT GUARANTEES
A. Types Allowed: Prior to approval of a Final Subdivision Plat the applicant shall provide a performance
guarantee to ensure the completion of required improvements within a period of time as agreed upon
by the Administrator and the applicant, and expressed in the guarant ee. Such guarantee may be in the
form of a performance bond, a surety bond, a cash deposit, or a letter of credit. A performance
guarantee shall be posted in the amount of 125% of the total cost of improvements.
1. Performance/Surety Bonds and Letters of Credit: The performance or surety bond, or letter of
credit, shall be in a form acceptable to the city. It shall include a pledge by the bank, insurance
company or other bonding/lending institution that the funds necessary to carry out the terms of
the agreement are guaranteed for payment and will be released only upon receipt of written
instruction from the city.
2. Cash Deposits: If surety is in the form of a cash deposit with the City of Beaufort, proportional
parts thereof shall be refundable in relation to progress payments less retainage, subject to
approval of the city and subject to a minimum deposit balance of 25% of the pr oject cost.
3. Maintenance Guarantees: If the applicant completes all required improvements and complies
with all conditions of the subdivision agreement as determined by the city, the remainder of
monies retained by a financial institution or by the city may be released to the applicant or hi s
successor in title. Prior to release, the applicant shall provide the city, prior to the issuance of any
building permit, a performance bond, a surety bond, or a cash deposit equal to the amount
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 4 of 43
determined by the city that would ensure the repair of any damage to the existing improvements
during the course of any construction, but in no case will the amount of the security be less than
$1,000.00 for each individual building lot. Prior to the issua nce of any certificate of occupancy,
the city shall determine whether or not any breakage or damage has occurred. If no damage to
any off-site improvements has occurred, then the city may release the security to the applicant
or his successor in title. If damages have occurred, they shall be repaired, or the city may draw on
the security before it is released.
7.1.6 EASEMENT AND UTILITY STANDARDS
A. Multiple installations within easements: Easements shall be designed so as to provide efficient
installation of utilities. Public utility installations shall be located as to permit multiple installations
within the easements. The developer will establish final utility grades prior to utility installations.
Public utility easement dedication shall be required with any minor or major subdivision action.
B. Underground utilities: Telephone lines, electric lines, cable television lines and other like utility services
shall be placed underground. The applicant or developer shall be responsible for complying with the
requirements of this Section and shall make the necessary arrangeme nts including any construction or
installation charges with each utility provider for the installation of such underground facilities.
Transformers, switching boxes, meter cabinets, pedestals, ducts and other facilities necessaril y
appurtenant to such underground utilities shall be placed underground or on the surface but not
on utility poles. Screening or fencing is required subject to approval of the City. Electric transmission
and distribution feeder lines and necessary appurtenances thereto may not be placed above ground
unless they are carrying greater than 115 kV. Upon approval of the City, such facilities shall be placed
within easements or rights-of-way provided for particular facilities.
7.2: STREET NETWORK AND DESIGN STANDARDS
7.2.1 STREET INFRASTRUCTURE PLANS
A. Purpose and Intent: The Street Infrastructure Plans (in Appendix C) provide diagrams of the city's
street network and establishes the ideal alignment, hierarchy and design characteristics - including
total right-of-way width, sidewalk and streetscape amenities, parking lanes , travel lanes and other
geometric and urban design details - for all existing streets, proposed streets that have been adopted
as part of an Official Map, and new potential streets in the City of Beaufort.
B. Official Street Network Plan: Pursuant to the authority of S.C. Code 1976 § 6 -7-1210 et seq. (1976), as
amended, the City has previously adopted several Official Maps. An Official Street Network Plan is
incorporated into this Code in order to represent a composite of these previously -adopted Official
Maps.
1. Purpose: This plan represents a composite of all Official Maps, to date, in the City. The map
designates existing or proposed streets or ways within the City that are targeted for creation,
expansion or other improvements. The Official Street Network Plan shall in itially consist of a
series of four (4) separate maps, included in Appendix C, which shall be deemed a part of the
Beaufort Code.
2. Modification: The Official Street Network Plan may be modified or supplemented per the
procedure for Amendments and Rezonings (Section 9.16). In addition, the maps will be
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 5 of 43
automatically updated as additional Official Maps are approved per the appropriate process
required by state law.
C. Street Frontage Requirements: The street sections noted in Appendix C show specific street designs
for the purposes of identifying future improvements by both the city and fronting property owners.
These sections depict the ideal arrangement and design of street elements.
1. Applicability: For any project that is considered part of a Major Subdivision )Site Plan, or requires
a Certificate of Appropriateness, as a Major project type (Section 9.10.2 A.2.), and/or which
affects one whole block face, the fronting property owner shall install all prescribed streetscape
improvements as part of the development project. . The installation of street frontage
improvements is required prior toshall be a condition of final plat approval for major
subdivisions, and certificates Certificates of occupancy Occupancy for Site Plans.
a. Exception: If similar elements as prescribed in the street section exist — e.g., on-street
parking, sidewalk, tree plantings — the requirement to install the streetscape element(s)
shall be waived if those items meet the intent of the prescribed street section, even if the
existing items do not meet the exact requirements of that street section. Example
Scenarios: If a street section prescribes a 5-foot sidewalk, but a 4-foot sidewalk already
exists, the existing sidewalk will satisfy the sidewalk requirement. Howeve r, if the street
section requires a 5-foot planting strip between the curb and the sidewalk, and the 4 -foot
sidewalk is directly adjacent to the curb, this would not satisfy the intent of the street
section and would need to be reconstructed per the prescr ibed standards.
2. Scope of Improvements: Street frontage improvements shall be installed along the entire
frontage of the property, to the centerline of the street, or if a multi -lane street, the affected
lane, at the sole cost of the applicant as directed by the Codes Administrator. The Codes
Administrator may permit modification of street improvement standards where the required
street improvements are not in the opinion of the Codes Administrator, roughly proportionate to
the impact, type, scale and cost of the proposed development action.
a. Street frontage improvements may include the following: curb, gutter, sidewalk, storm
drainage, street lighting, traffic signal equipment, utility installation. extension, or relocation,
landscaping strip, street trees and landscaping, irrigation, str eet widening, pavement overlay or
reconstruction, and channelization.
b. In addition to required frontage improvements, the applicant shall provide ramps from the
new sidewalk or walkway to the existing shoulder, across streets and pavement and
channelization tapering back to the existing pavement and channelization as requ ired to address
safety concerns.
D. Dedication of Right-of-Way:
1. Dedication of Right-of-Way. In the case of a street section adopted as part of an Official Map,
where the width of the existing right-of-way is insufficient to install the prescribed street
section, the fronting property owner shall be required to reserve the appropriate amount of
right-of-way (as measured from the centerline of the existing street). The future right-of-way
shall conform to all of the street network requirements of Section 7.2.2. Where a new right-of-
way that is not shown in the street regulating plan, is required a s part of a new development, it
shall be designed with appropriate elements based on its proposed location and zoning district.
(See Appendix C).
a. In the case of a street section that is not part of an Official Map, where the width of the
existing right-of-way is insufficient to install the prescribed street section, the property
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 6 of 43
owner shall reserve the appropriate amount of right-of-way to complete the desired street
section. If the owner c dedicates and installs the complete right-of-way, the cost of the
improvements may be compensated - see Section 7.2.1 DE.
b. Where a future right-of-way is identified on an Official Map, and thus represented on the
Official Street Network Plan— these are indicated as "New Adopted Streets" — new
development shall reserve this area for the new street in the future. If access is ne eded to
the site in that location, the street shall be constructed in the general location shown.
c. Exceptions and Alternatives:
i. Where available right-of-way — due to existing structures and topographic conditions
limited to wetlands, specimen and landmark trees, — do not functionally permit the
full section to be constructed, the Administrator may adjust the required street
section.
E. Compensation: When a project is required to make off-site improvements within the existing right -of-
way, dedicate and/or improve a street with insufficient right -of-way, or install a new street (be it
public or private) per the requirements in Section C. above, compens ation may be available. To the
extent that the City has the authority and the ability, the Traffic Impact fee for the project shall be
reduced by the assessed value of the dedicated land and/or construction cost of the right -of-way
improvement. This may be done either as a direct reduction, rebate, or reimbursement of fees . (Ord.
No. O-14-23, 9-26-2023)
7.2.2 STREET NETWORK REQUIREMENTS
A. Continuation of Adjoining Street System: The proposed street layout shall be coordinated with the
street system of the surrounding area to form an interconnected street pattern, formalized by a
platted public access easement. Adequate street connectivity shall be assessed by the TRC, based on
the ability of the proposed alignments to:
1. Permit multiple routes between origin and destination points;
2. Diffuse traffic; and
3. Shorten walking distances.
B. Block Sizes: Blocks shall be compact so that they are comfortably walkable and appropriate for their
context.
1. In T3-S zones, block sizes are flexible, but the perimeter shall not exceed 2,640 linear feet (½
mile). An average block perimeter less than 2,000 feet is preferred.
2. In T3-N zones, block sizes are flexible, but the perimeter shall not exceed 1,700 linear feet (⅓
mile). An average block perimeter less than 1,500 feet is preferred.
3. In T4, and T5 and RMX zones , blocks shall be no more than 400 feet on any side. An average
block length of 250—300 feet is preferred. The block perimeter shall not exceed 1,320 linear feet
(¼-mile).
4. Exceptions may be made for natural elements such as wetlands, trees, topography, and cultural
resources, to be incorporated into the site design.
C. Street Stubs: New developments shall connect to any existing street stubs from adjacent properties
and stub to all adjacent properties.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 7 of 43
1. Exemptions: Street stubs shall not be required where the Planning Commission finds the
conditions listed below would prevent connections:
a. Topographical conditions (pre-development slopes of 18% or greater).
b. Environmental conditions (marshes, floodplains, specimen and landmark trees, etc.).
c. Property shape.
d. Property accessibility (existing platted subdivision with no stubs).
e. Incompatible adjacent land uses.
2. Location: Where multiple connection opportunities exist, street stub connections shall be
prioritized in the site design as follows:
a. Adjacent parcels 20 acres or greater in size.
b. Adjacent parcels that abut or are traversed by existing or proposed streets.
c. Where the Street Network Diagram recommends a street connection (indicated as a
proposed street).
3. Design:
a. Stub streets and streets intended for extension during future phases shall be constructed
to extend to the property line for constructability to adjoining property.
b. Stub streets shall not exceed 150 feet in length without a paved turnaround (permanent or
temporary).
c. Disclosure: The Final Subdivision Plat shall be recorded depicting that future connection is
required at any stub streets and streets intended for extension during future phases. A
clearly visible street sign shall be erected at the end of the stub street stating that the
street is planned to connect to a future street.
D. Cul-de-sacs and Dead-end Streets: Dead-end streets and cul-de-sacs are prohibited, except for only
the T-3 and LI zoning districts, where cul-de-sacs or other turn-arounds may be approved by the
Planning Commission. Compliance with the following standards must be met in all circumstances:
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 8 of 43
1. Permanent dead-end streets shall be no longer than 300 feet and shall be provided with a turn, -
around such as a cul-de-sac or close.
2. Temporary dead-end streets shall be provided with a temporary turnaround area which shall be
designed considering traffic usage, maintenance, and removal.
3. Alternative design solutions, such as a close (first preference), or a loop road cul -de-sac (second
preference) are preferable to a typical cul-de-sac.
4. Cul-de-sacs shall have a minimum right-of-way radius of 50 feet and minimum paved radius of 40
feet. When ample radii exist, cul-de-sacs shall contain a central planted median.
5. Whenever cul-de-sac roads are created, at least one pedestrian access easement shall be
provided, to the extent practicable, between each cul -de-sac head or road turnaround and the
sidewalk system of the closest adjacent road or pedestrian pathway. The access easement shall
be direct with a minimum width of 12 feet.
E. Gated Streets: New gated streets are prohibited.
1. Exceptions: they They may be permitted, at the discretion of the Planning Commission, in T3 -S
zoning districts where connection to the existing street grid is not practicable due to topography
or existing surrounding conditions.
2. They may be permitted by the Planning Commission when the access proposed to be gated is an
alley or rear lane and is not the primary building frontage.
F. Street Naming and Renaming: Proposed Street names and number systems will be reviewed by the
administrator and the Beaufort County Emergency Management Department. No duplicate/similar
names are allowed, as determined by these agencies.
G. Reserved Strips Prohibited: Reserved strips at the terminus of a new street shall be prohibited.
7.2.3 LOT ACCESS STANDARDS
A. Applicability: Any development that requires an access point (rear alley/lane or driveway) for purposes
of ingress and/or egress shall be subject to the provisions of this section. All new accesses must be
approved by the appropriate permitting authority. Access points may not be installed on undeveloped
property less than 2 acres.
B. Maximum Number: For single-family and two- and three-family dwellings, only one driveway shall be
permitted per lot. In T3-S, circular driveways may be permitted on lots greater than 100 feet in width,
where no sidewalk exists. Driveways may only be installed when rear a ccess is not possible or required.
For double frontage lots, one curb cut per street may be permitted. For all other building types, the
maximum number of driveways allowed for any property is outlined in the table below.
FRONTAGE
WIDTH
MAXIMUM PERMITTED DRIVEWAYS (CURB CUTS)
PER STREET FRONTAGE
up to 150 feet 1
150 feet or more 2 - Additional driveways (in excess of 2) shall be permitted only after the applicant
successfully demonstrates the necessity for such additional driveways, as determined by
the appropriate Design Review Body. Along arterial roads and thoroughfares, such
additional driveways shall be "right-in, right-out" driveways only.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 9 of 43
C. Location and Spacing:
1. Street Intersection: No curb or other access point shall be located closer than:
a. 20 feet from the intersecting point of the 2 street right -of-way property lines involved (or
such lines extended in case of a rounded corner);
b. 25 feet from the intersection of the 2 curb lines involved (or such lines extended in case of
a rounded corner), whichever is the least restrictive.
2. Spacing: All access points shall have a minimum separation from certain features as follows:
FEATURE MINIMUM SEPARATION1
Adjacent Property Line (does not apply to shared or
joint-use driveways)
0 ft
Another Curb Cut (driveway or street intersection) on
all roads except Major Thoroughfares
25 ft
Major Thoroughfares — defined as streets with the
Street Section designation of Major Thoroughfare, or
the Robert Smalls Parkway, Sea Island Parkway/Lady's
Island Drive, or Boundary Street Specific Street Section
— Another Curb Cut (driveway or street intersection)
Depends on Posted Speed Limit
< 35 mph 100 ft
35 mph 200 ft
40 mph 250 ft
45 mph2 300 ft
50 mph2 400 ft
55+ mph2 500 ft
1 Minimum separation is measured from centerline
2 On Robert Smalls Parkway (Hwy 170) west of Parris Island Gateway, a minimum of 500 ft. separation distance
is required
3. Corner Lots: Access points on corner lots shall be from the side (or secondary) street, unless a
shared curb cut on the main thoroughfare is existing or proposed.
4. Access to Lots from Major Thoroughfares: Driveways serving individual residential lots shall not
have direct access onto streets identified as Major Thoroughfares — as identified on the second
row of the chart in Section 7.2.3 C.2. — unless no alternative means of access, such as alleys or
parallel access roads, exists, and it is unreasonable or impractical to require an alternative means
of access.
5. Shared Access: See Section 5.7.7 C.
6. Rear Access Required/No Front Access: For lots developed in the transect zones of T-3N, T-4, T-5
UC, all new access points shall be from a rear alley and/or road, except for lots within the historic
district. Exemptions to allow front loaded access points where connection to the existing street
grid is not practicable due to topography or existing surrounding conditions shall be at discretion
of the Planning Commission with approval of major subdivisions, and the Codes Administrator for
individual lots.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 10 of 43
D. Size:
1. Alleys: Alley pavement width may be a maximum of 24 feet wide for two -way traffic and 16 feet
wide for one-way traffic. For more design standards, see Appendix C.
2. Driveways:
a. Driveways for single-family and 2- and 3-family uses may not exceed 12 feet wide, except in
T3-S district, where they may be a maximum of 20 feet wide.
b. Tandem Parking: Tandem parking is allowed in all zones for all residential uses if:
i. Both tandem parking spaces satisfy the parking requirement of one residential
unit; and
ii. Neither of the tandem parking spaces shall be for required accessible parking
spaces.
c. Driveways to other uses and parking areas shall not exceed 24 feet in width for 2 -way
drives or 12 feet in width for one-way drives, except those with turn lanes required by the
city or SCDOT.
E. Access to Lots from Alleys/Rear Lanes:
1. Specific to T3-N, T4, and T5 districts: Alleys/rear lanes shall be provided along the rear property
lines of lots as follows:
a. In new subdivisions greater than 1 acre, alleys shall be provided for newly created lots that
meet any of the following criteria:
i. The lots are part of a block face with an average lot width of 60 feet or less at
the building setback line (excluding lots on cul -de-sacs).
ii. The lots are arranged around a Common Open Space.
iii. The lots front a collector or arterial road, regardless of the average lot width.
iv. The lots are intended for multi-family dwellings and/or mixed-use buildings.
b. In infill situations, the same standards apply as specified above, but only for developments
that include 4 or more contiguous lots, where one lot is a corner lot. In the Historic District,
the standards apply only to the Beaufort Conservation District; the requirement may be
waived at the discretion of the Historic Review Board.
F. Specific to Commercial Developments and Subdivisions:
1. Out-parcels: Out-parcels for shopping, office, or industrial centers shall be limited to internal
access to the center, unless otherwise approved as part of a master development plan. All
driveways shall be paved from the road to the property line.
2. Abandoned Driveways: Abandoned driveways (i.e., curb cuts that are no longer used for
vehicular access and are physically blocked by structures) shall be closed, and the area shall be
restored to the typical cross section of the right -of-way.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 11 of 43
7.2.4 STREET DESIGN STANDARDS
A. Street Section Design: The elements and widths of all proposed streets shall be in conformity with the
appropriate street section designated in the Street Regulating Plan (Section 7.2.1 and Appendix C).
B. Traffic Control and Signs: The type and location of traffic control devices used on City streets must be
approved by City Staff, and traffic control on private Streets shall be included and approved as part of
the major subdivision or site plan. Traffic signals should be used where warranted, but alternate traffic
control such as roundabouts should be considered first. When it can be shown that a particular zoning
action, master plan, or development plan impacts the street system to a point that a traffi c signal is
warranted according to Manual on Uniform Traffic Control Devices (MUTCD) and approved by City
Staff, the developer shall be responsible for all or a portion of the signal installation.
C. Sidewalks/Multi-use Paths: Where required per the Street Section in Appendix C, all sidewalks or
multi-use paths must be constructed concurrently with the street, or, if the street is already
constructed, prior to acceptance of any improvements. Exceptions to, the requirement to in stall a
sidewalk may be granted by the Planning Commission if:
1. Alternative pedestrian paths/bikeways have been or will be provided outside of the normal right -
of-way.
2. There are unusual topographic, vegetative, or other natural conditions to the extent that strict
adherence to said requirements would be unreasonable and not consistent with the purposes
and goals of this Code.
D. Utility Easements: Utility easements which require a width of 8 feet or larger shall be located in rear
alleys or along the side or rear lot lines. Special permission to install utility easements in other locations
may be requested by the utility companies and is subject to approval by the appropriate Design Review
Body.
E. Special Consideration to Protected Resources and other Natural Features: Street layout and design
shall give additional consideration to preserving protected resources and enabling natural areas to be
protected or minimally disturbed. Where streets are built in areas that have protected resources or
natural features, all utilities shall be placed within the street right-of-way and under the street in order
to avoid additional destruction of the natural features.
7.2.5 STREET TREE PLANTING REQUIREMENTS
A. Planting Areas: Planting strips and tree wells shall be established in accordance with the width and
plantings designated in the appropriate Street Section of the Street Regulating Plan (7.2.1 and
Appendix C).
B. Location and Number: Street trees shall be planted in the location and per the spacing specified for the
corresponding street classification in Appendix C. However, in specific cases, where due to the location
of utilities or other site constraints exist, the Planning Commission may allow street trees to be planted
on private property adjacent to the right -of-way.
C. Tree Species: Overstory and understory trees as prescribed in this section reference Appendix A.2
(Recommended Trees and Shrubs).
D. Minimum Tree Size: At the time of planting, young trees should be 2.5 inch caliper, with the lower side
of the crown a minimum of 6 feet above grade to avoid hazards to pedestrians.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 12 of 43
7.3: STREET ENGINEERING STANDARDS
7.3.1 STREET DESIGN, CERTIFICATION, AND CONSTRUCTION SPECIFICATIONS
A. Design Drawings and Certification: Professional engineers, registered in the state, shall prepare plans,
profiles, cross sections, and specifications for all subdivision roads and streets. The engineers shall
certify roads/streets are built to comply with the approved plans and specificati ons. Cross sections
shall be developed every 100 feet at intersections and break points in grade. Cross sections shall show
the complete rights-of-way including travel lanes, shoulders, ditches, curb and gutter, and sid ewalks
and utility locations, as applicable.
B. Construction Specifications for Paved Streets: Street construction specifications for paved streets shall
be in compliance with the South Carolina Department of Transportation Standards.
7.3.2 TRAFFIC IMPACT ANALYSIS
A. Applicability: A "traffic impact analysis" (TIA) shall be required for any development that is shown — in
the most recent Institute of Transportation Engineers (ITE) Trip Generation Manual or any alternative ,
approved at the discretion of the Planning Commission or the TRC, or by the engineering department
— to generate more than 50 trips during the peak hour on the adjacent street(s).
1. A second phase, second subdivision, or addition that generates traffic beyond this threshold
when taken as a whole shall also require a TIA, even though that development does not qualify
on its own.
2. A use shall not be changed without conducting a new TIA if the new use would generate traffic
beyond the 50 trips during peak hour threshold above. The Planning Commission may waive this
requirement.
3. Exception: Development — except for Educational Facilities with greater than 100 students — on
lots included in the Boundary Street Master Plan, adopted on August 28, 2006, and lots in the
area bounded by Calhoun Street, Carteret Street, Bay Street, and Ribaut Road, and lots zoned
Limited Industrial (LI), shall not be subject to the requirements of this section.
B. Traffic Access Management Analysis: As part of the TIA process, the proposed development shall have
an "access analysis" undertaken by the administrator to ensure that sufficient access to all proposed
developments and subdivisions is achieved.
1. The standards in the South Carolina Department of Transportation's "Access and Roadside
Management Standards Manual" (a.k.a. ARMS Manual) shall serve as a guide for this analysis,
which shall include identification of the following:
a. Access improvements that the applicant must install at his or her expense, such as
deceleration lanes;
b. The location of any curb cuts based on, but not limited to, sight distances, existing roadway
infrastructure, opposing driveways locations, and shared access;
c. Requirements for adequate driveway design, including, but not limited to, turning radius
and stacking distance.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 13 of 43
2. The access requirements approved by the Planning Commission or the TRC shall be incorporated
on development or subdivision plans prior to their approval.
3. If an applicant is required to provide site-related traffic improvements, the cost of implementing
such improvements shall be borne by the applicant, and no such costs shall be eligible for a credit
or offset from any transportation impact fees unless spec ifically permitted by the Development
Fee Procedures - Beaufort County Code of Ordinances, Chapter 82, Article VII or most recent
version.
C. Traffic Impact Analysis Plan Preparation:
1. The TIA shall be conducted by an engineer registered in South Carolina who is experienced in the
conduct of traffic analysis.
2. Prior to beginning the TIA, the applicant shall supply the city with the following:
a. A written narrative describing the proposed land use(s), size, and projected opening date of
the project and all subsequent phases.
b. A site location map showing surrounding development within a one -half mile of the
property under development consideration.
c. A proposed site plan or preliminary subdivision plat illustrating access to public or private
roads and connectivity to other contiguous developments.
3. Prior to beginning the TIA, the applicant shall receive, in writing, the parameters to be followed in
the study, including the directional split of driveway traffic, trip distribution, background traffic
growth rate, previously approved but not complete d projects, and the intersections to be
analyzed, along with any associated turning movement counts that are available or discussed and
approved by the TRC.
4. To review the TIA, the Planning Commission and TRC will require current trip generation
information, available information on land use, travel patterns, and traffic conditions, and shall
consult with the SCDOT.
D. Plan Contents:
Background information Requirement
List of all nonexistent transportation improvements
assumed in the analysis
Required
Map of site location, description of the parcel,
general terrain features, and location within the
jurisdiction and region.
Required
Description of geographic scope/ limits of study
area.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed .
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Plan at an engineering scale of the existing and
proposed site uses.
Required
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 14 of 43
Description and map or diagram of nearby uses,
including parcel zoning.
Required
Description and map or diagram of existing
roadways.
Required
Description and map or diagram of programmed
improvements to roadways, intersections, and
other transportation facilities within the study
area.
Required
Analysis of Existing Conditions
Collected daily and peak hour of the generator
traffic volumes, tabulated and presented on
diagrams with counts provided in an appendix.
Required
Analyses for intersections and roadways identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for
each lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments, tabulated and
presented on diagrams, if facilities or routes exist.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed –
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Incorporation of all Traffic Impact Analysis studies
and Trip Generation from approved developments
or vested unbuilt developments within mile radius
at time of proposal.
Required (submitted for any jurisdiction, including
the Town of Port Royal, and County of Beaufort)
Speed Study If requested by City
Crash history near site If requested by City
Sight distance If requested by City
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 15 of 43
Analysis of Future Conditions without Development
Description of and justification for the method and
assumptions used to forecast future traffic volumes.
Required
Analyses for intersections and roadways as identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for each
lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments tabulated and
presented on diagrams, if facilities or routes exist o r
are planned.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed .
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Trip Generation
Site trip generation, with tabulated data, broken out
by analysis year for multi- phase developments, and
including justification for deviations from ITE rates, if
appropriate.
Required
Description and justification of internal capture
reductions for mixed use developments and pass -by
trip reductions, if appropriate, including table of
calculations used.
Required
1. Phased Developments: All phases of a development are subject to review, and all traffic plans for
the entire development shall be integrated with the overall traffic analysis. A TIA for a specific
phase of development shall be applicable to the phase of development under imme diate review.
However, each phase of development shall expand and provide detailed analysis at the
development plan stage beyond the estimates provided for at the concept plan or master plan
stage.
2. Infrastructure Analysis: The adequacy of the roads that the development will be accessed from
shall be assessed in the TIA. Recommendations for improvements shall be made. The relative
share of the capacity created shall be broken down as follows: development share, other
developments' share, any existing overcapacity, and capacity available for future growth.
3. Required Elements of the TIA:
a. A site plan or subdivision plat identifying accesses to and from existing or proposed streets
and intersections, along with all opposing intersections across adjacent streets.
b. Description of the proposed development, including the type and intensity of proposed
land use(s) including, but not limited to: the number of residential units by type, the
number of existing and proposed lots, the type of proposed nonresidential devel opment
and the amount of such development measured by gross floor area or other appropriate
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 16 of 43
unit of measurement, the general size and type of accessory development or facilities, and,
for nonresidential development, adequate information to identify the appropriate land use
category for trip generation.
c. Projected vehicular trips to and from the completed development during a.m. and p.m.
peak hour — trip rates shall be taken from ITE Manual or alternatively, an applicant may
elect to perform, at his own expense, a "trip generation study" which may be su bmitted as
part of the traffic impact analysis plan. Such trip generation study shall be subject to the
review and verification of the TRC and engineer. For proposed uses not specifically listed in
the ITE Manual, and for which a trip generation study has not been performed, the
designated engineer(s) shall determine the most appropriate trip generation rate. The TRC
shall make the determination of the appropriate trip generation rate, from whatever the
source. The percentage of pass-by trips, if used in the plan, shall be included, as well as the
source of this information.
d. A written narrative setting forth the assumptions upon which any projection was made in
developing the traffic impact analysis plan shall be included in the analysis. If the
assumptions are derived from the ITE Manual, the materials shall be referenced and
properly cited. If the assumptions are not from the ITE Manual, appropriate excerpts from
other reliable transportation planning resources shall be included in the study, and reasons
underlying the assumptions shall be stated in the narrative.
e. The TIA shall review access to the site. The adequacy of the entrance design shall be
evaluated, and recommendations made on acceleration and deceleration lanes, left -turn
lanes, or signalizations shall be part of the TIA. Educational facilities shall include pick -up
and drop-off plans and analysis of the impact on the surrounding streets and interse ctions.
f. The TIA shall review the number and types of curb cuts that are permitted. In particular,
the TIA shall assess the connection of the property to adjoining properties. Where the use,
scale of development, or size of adjoining properties is such that trip s would be anticipated
between the proposed use and the other properties, the TIA shall make recommendation
on interconnections. The TIA shall recommend interconnections to provide a smooth flow
of traffic between uses along arterials and collector roads t o ensure that as much traffic as
possible uses secondary roads, rather than major roads, for short trips.
g. The TIA shall be based on intersection analysis procedures for signalized intersections as
identified in the most current edition transportation research board's highway capacity
manual, and/or the last update that analyses and emulates these procedures by means of
computer software, if available. The results of any required analysis/computer analysis
shall, at a minimum, indicate compliance or variance from the Traffic Goals (Section 7.3.3
M).
h. The intersections that must be analyzed in the study are identified as:
i. Any intersection that serves as a development's point of access. This will
include intersections of public and/or private roads with major arterials, and
driveways offering direct access.
ii. The first major intersection as identified by the city engineer on both side of
the development's point of access.
iii. Other intersections on major arterials if development generates more than 50
a.m. or p.m. peak hour trips to that intersection, or if the intersection's level of
service or demand is significantly impacted by site related traffic.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 17 of 43
iv. Unsignalized intersections and access drives — these shall be considered if
development impacts are anticipated. The plan must include the results of an
analysis of the operating conditions of critical intersections and/or all
intersections identified in the concept plan. The analysis shall reflect the
projected condition of these intersections and movements, based on the
scheduled opening date of the development. Other phases of the development,
if they can be reasonably determined, shall be considered as well.
E. Mitigation Plan Required: If the initial analysis indicates that the city's adopted Traffic Service Level
Goals (Section 7.3.2 M.) will not be met, a mitigation plan must be prepared, based on additional
analysis. The mitigation plan must show how the city's Traffic Service Level Goals are addressed as
mitigated. Applicants will be responsible for mitigating the traffic impacts at any intersection affected
by a proposed development.
1. If a traffic signal is recommended, the TIA shall provide information that:
a. Clearly indicates the need for a traffic signal.
b. Assesses the ability of other existing, planned, or proposed public roads to accommodate
the new traffic at a location other than the main highway in the vicinity of the proposed
development.
c. Describes in detail how a specific development will affect the study area transportation
system.
d. Provides documentation of appropriate South Carolina Manual of Uniform Traffic Control
Devices signal warrant satisfaction.
e. Gives design geometry of the private road that is consistent with that of public road
intersections, including curbs, appropriate lane widths, pavement markings, and vertical
alignment. Other roadway factors to be considered include, but are not limited to, speed,
type of highway, grades, sight distance, existing level of service, conflicting accesses, and
the effect of future traffic signal systems.
f. Provides an approach-throat length for the road to ensure the movement of vehicles
entering the site will not be impeded by conditions within the development and ensure
that all signal-spacing requirements are adequately met.
2. The desirable spacing of signalized intersections on principal arterials is the SCDOT, county, or
city standards. The TRC may recommend to SCDOT the installation of a traffic signal at locations
where, using SCDOT standards, spacing is inappropriate due to topography, existing or proposed
road layout, documented accident history, unique physical constraints, existing or proposed land
use patterns, or requirements to achieve specific objectives for highway segment designations, as
shown in any locally adopted land use or transportation plan, approved city or county
transportation plan, or approved transportation policy.
3. Signal spacing concerns may be ameliorated in the following ways:
a. A proposed private road that may otherwise be considered for the installation of a traffic
signal may be replaced by an on-site route or a frontage road that directs traffic to or from
a nearby public road.
b. A private road that is being considered for traffic signal installation may be required to
connect to the existing or planned local road system to allow uses of surrounding
properties.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 18 of 43
c. An existing or proposed intersection may be relocated.
d. A shared private road may be required to serve the needs of the multiple properties.
4. A traffic signal progression analysis is required if the proposed location is closer than the SCDOT
standards, given the presence of existing signals or the possible existence of identified future
signals proposed as part of a highway signal system. A traf fic signal progression analysis for all
new, revised, or planned traffic signal systems on state highways shall be performed using
methods, models, computer software, data sources, roadway segment length, and assumptions
approved by the TRC. The roadway segment, analyzed to the extent possible, shall include all
traffic signals in the existing or future traffic signal system. The progression analysis shall:
a. Demonstrate acceptable existing and future traffic signal systems operation that may
include the morning peak, evening peak, midday period, and other appropriate time period
during any day of the week, adjusted for peak season, for cycle lengths and tra vel speeds
approved by the TRC.
b. Provide for a progressed traffic band speed no more than 5 mph (8 km/h) below the
existing posted speed for both directions of travel during the off -peak periods, nor more
than 10 mph (16 km/h) below the existing posted speed during peak periods. Approv al by
the TRC is required where speeds deviate more than the above.
c. Demonstrate that sufficient vehicle storage is available at all locations within the traffic
signal system without encroaching on the functional boundaries of adjacent lanes and
signalized intersections. The functional boundary of an intersection shall be determined in
discussion with the TRC, based on existing or projected conditions.
d. Provide a common cycle length with adequate pedestrian crossing times at all signalized
intersections.
e. Provide a progression bandwidth as large as that required, or as presently exists, for
through traffic on the federal or state highway at the most critical intersection within the
roadway segment. The most critical intersection is the intersection carry ing the highest
through volume per lane.
5. The traffic signal progression analysis shall be supplemented by a traffic engineering report that
also considers highway capacity and safety of the roadway segment under consideration. Traffic
volumes, intersection geometry, and lane balance, considere d at all locations, shall be
appropriate for the present and identified future conditions, which are usually considered to
include the year of completion, and 5 years into the future.
F. Summary: A clear and concise summary of recommended improvements that can serve as an
executive summary is required.
G. TIA Review: The TRC shall review all TIAs as part of the applicable Design Review phase —. Final TIAs
shall be approved prior to the applicant submitting a Project Permit application (Section 9.5).
H. Application: A TIA shall be submitted to the TRC. Coordination with other entities in the county
government or South Carolina Department of Transportation (SCDOT) shall be the responsibility of the
city.
I. Completeness: The Planning Commission and/or TRC shall determine whether a TIA is complete.
Thorough and complete TIAs are the responsibility of the applicant. Failure by the applicant to provide
a complete TIA may result in review delays for their plat or plan.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 19 of 43
J. Action on TIA: The TRC must first approve the TIA in regard to completeness and accuracy. Following
review of the required impact analysis plan, TRC shall recommend to the Planning Commission action
as follows:
1. Approval of the TIA as submitted;
2. Approval of the TIA with conditions or modifications as part of the development review and
approval process. An acceptable TIA with traffic mitigation measures may include the reduction
of the density or intensity of the proposed development, phasing of the proposed development
to coincide with state and/or county-programmed transportation improvements, applicant -
provided transportation improvements, fees in lieu of construction, or any other reasonable
measures to ensure that the adopted traffic service -level goals are met. If mitigation is required,
it shall be required as a condition of any approval from the city.
K. Timing of Implementation: If a traffic mitigation program is part of an approved TIA, the developer
may be required to place a performance bond on all traffic mitigation improvements required as a
result of his project. This requirement may arise if the timing of the improvements needs to be
synchronized with other scheduled improvements anticipated for the area.
L. Responsibility for Costs of Improvements: The costs of implementation of an approved mitigation
program shall be the responsibility of the applicant. No certificates of zoning compliance or building
permits shall be issued unless provisions of the TIA are met.
M. Traffic Service Level Goals: The average stop time delay in seconds per vehicle for each intersection
determined to be critical to the TIA for the proposed development shall be compared to the city's
traffic service level goal of "D" for the average delay for all vehicles at any sign alized intersection during
the a.m. and p.m. peak hours.
7.4: COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE
7.4.1 PURPOSE AND INTENT
A. Intent: Community Green Space and Community Open Space is intended for the use and enjoyment of
a development's residents, employees, or users. These spaces serve to preserve natural areas, ensure
access to open areas and recreation, reduce the heat island effect, enhance stormwater quality, and
provide community health benefits. Community Green Space and Community Open Spaces are not, by
definition, required to be deeded or to be granted via easement to any public entity or municipality.
See Section 7.4.5 for ownership information.
B. Purpose: The purpose of this section is to provide a set of Community Green Space and Community
Open Space types and their associated standards to use within all districts. Community Green Space
and Community Open Space types in this section are distinct from those areas that are environmentally
sensitive and must be otherwise protected as regulated through Article 8 (Environmental Protection) .
C. Applicability: See Section 7.1.2.
D. Community Green Space Definition: an area of grass, trees, parks, trails or multi-use pathways, or
other vegetation set apart for recreational or aesthetic purposes within a development. It can be
privately or publicly owned.
E. Community Open Space Definition: Open space is land or water that is undeveloped and not used for
residential, commercial, industrial, or institutional purposes. It can be privately or publicly owned, and
can include areas like forests, farms, parks, and coastal lands.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 20 of 43
7.4.2 COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE REQUIREMENT
A. Minimum Requirements: Development in all districts shall preserve the minimum amounts of
Community Green Space and Open Space as identified below (see following page):
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 21 of 43
B. Areas to be Included in Community Green Space and Community Open Space Calculations: The features and areas identified in Section 7.4.3 shall
be credited towards the open space requirements for the purposes of complying with this article.
C. Areas not to be Included in Community Green Space and Community Open Space Calculations: The following areas shall not be counted toward
open space requirements:
1. Private yards which are not subject to an open space or conservation easement.
2. Public road rights-of-way or private street easements, including sidewalks located within those rights-of-way or easements.
3. Open parking areas and driveways for dwellings.
4. Land covered by structures not designated for active recreational uses.
5. Designated outdoor storage areas.
OPEN/CIVIC SPACE REQUIREMENT
SIZE T1 T3-S T3-N T4-HN T4-N T5-DC T5-UC RMX IC LI MHP 1
Less than 3
acres See footnote (3)
3 acres—
10 acres 50% 20% 15% exempt 10% exempt 10% 10% 15% exempt
10 acres—15
acres 50% 20% 15% exempt 10% exempt 10% 15% 20% exempt 10%
15 acres—40
acres 50% 20% 15% n/a 15% exempt 15% 20% 20% exempt 10%
Greater
than
40 acres
50% 25% 20% n/a 20% exempt 20% 25% 25% exempt 10%
1 Each Manufactured Home Park shall have a minimum total area of 2,500 square feet set aside for common recreational open space, or at
least 100 square feet of space for each mobile home lot, whichever is greater.
2 Specific to TND Overlay Projects: The open space requirement may be calculated comprehensively or by specific Transect zones. The
requirements of 2.8.3.G.2.c must be met in addition to the requirements of this table.
3 For properties less than 3 acres, community green space and community open space shall be at the discretion of the approving authority
(i.e.) Codes Administrator or Planning Commission.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 22 of 43
7.4.3 COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE TYPES
The majority of Community Green Space and Community Open Space shall conform to one of the 8 types in the table below. If 75% or more of the types listed
below are utilized for required open space, a 20% increase in number of dwelling units is permitted.
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Regional
Park/Natural
Preserve
A natural preserve that is
available for unstructured
recreation. It may contain
small civic buildings and
areas of structured activity,
but is primarily left natural.
These areas may include
forests as well as wetlands
and regional retention areas
if they are treated as
amenities (e.g. Port Royal's
Cypress Wetlands).
T1 Regional
Min: 200 acres*
Max: None
*Natural
preserves with
no structured
activity have no
minimum size.
Frontage:
Independent
Disposition:
Natural, formal
or informal
Passive and active
recreation, drinking
fountains,
Community facility <
7,500 gross square
feet, paths and trails
Sport Complex
An open space that
consolidates heavily
programmed athletic fields
and associated facilities.
T1, IC, RMX Regional
Min: 25 acres
Max: None
Frontage:
Independent
Disposition:
Formal or
informal
Passive and active
recreation, drinking
fountains, community
facility < 7,500 gross
square feet, paths
and trails
Community
Park
An open space that is
available for unstructured
recreation and a limited
amount of structured
recreation. It may contain a
limited amount of athletic
fields.
T3, T4, T5,
RMX, IC
Multiple
Neighborhoods
Min: 8 acres
Max: None
Frontage:
Independent
Disposition:
Informal
Passive and active
recreation, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 23 of 43
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Greenway
A linear open space that may
follow natural corridors, a
greenway provides
unstructured and limited
amounts of structured
recreation.
T1, T3, T4,
T5, RMX, IC
Multiple
Neighborhoods
Min: 8 acres or 1
mile
Max: None
Frontage:
Independent or
building
Disposition:
Natural or
informal
Passive and active
recreation, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Square/Green
An open space that is
available for civic purposes,
unstructured, and limited
amounts of structured
recreation. It can be located
along waterfronts.
T3, T4, T5,
RMX, IC
Neighborhood
Min: 0.5 acres
Max: 5 acres
Frontage:
Building
Disposition:
Formal
Passive and active
(unstructured or
structured)
recreation, accessory
structure, drinking
fountains, community
facility < 5,000 gross
square feet, paths
and trails
Plaza
A formal open space
available for civic purposes
and commercial activities, a
plaza is typically hardscaped
and can be located along
waterfronts.
T4, T5, RMX,
IC
Neighborhood
Min: 0.5 acres
Max: 2.5 acres
Frontage:
Building
Disposition:
Formal
Passive recreation,
accessory structure,
drinking fountains,
paths and trails
Pocket
Park/Pocket
Plaza
An open space that is
available for informal
activities in close proximity
to neighborhood residences.
Pocket plazas are usually
paved.
T3, T4, T5,
IC, RMX
Neighborhood
Min: 4,000
square feet
Max: 0.5 acre
Frontage:
Building
Disposition:
Formal or
informal
Passive recreation,
accessory structure,
drinking fountains,
paths and trails
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 24 of 43
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Playground
An open space designed and
equipped for the recreation
of children. A playground
may be fenced and may
include an open shelter.
Playgrounds may be included
within other civic spaces.
T3, T4, T5,
IC, RMX
Neighborhood
Min: None
Max: None
Frontage:
Independent or
building
Disposition:
Formal or
informal
Accessory structure,
drinking fountains,
paths and trails
Notes:
1. The illustration and description of each civic space type is illustrative in nature and not regulatory.
2. The Permitted Districts may be modified per a plan if the project is utilizing the Traditional Neighborhood Development Floating Overlay District
(Section 2.8.3).
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 25 of 43
The following provisions apply to the eight (8) Community Green Space and Community Open Space Types listed in
the table:
A. Playgrounds and Community Gardens: These may be incorporated into any of the other Community
Green Space and Community Open Space types - except Natural Preserve - or may stand alone.
B. Waterfront: When Community Green Space and Community Open Space is required, per Section 7.4.2,
developments that contain waterfront access should include some type of common access to at least
25% of the waterfront. This counts towards the Community Green Space and Community Open Space
requirement. When open space is required, for every 10% of the waterfront that is allocated for public
access, a 5% increase in number of dwelling units shall be permitted, up to a maximum of a 20%
increase.
C. Illustrative Standards: The columns titled "Diagram," "Description," and "Typical Facilities" of the table
of Community Green Space and Community Open Space Types are illustrative only.
D. Regulatory Standards: The following elements shall be regulatory:
1. Service Area: Describes how the space relates to the city as a whole and the area that will be
served by the Community Green Space and Community Open Space.
2. Size: The permitted size for each Community Green Space and Community Open Space.
3. Frontage: The relationship along property lines of a Community Green Space and Community
Open Space to adjacent buildings or lots.
a. Building: Community Green Space and Community Open Spaces that are listed as having a
"building" frontage shall have the fronts of buildings, either attached to the park or across
a street, facing onto the space for a minimum of 75% of the perimeter.
b. Independent: Community Green Space and Community Open Spaces that are listed as
having an "independent" frontage shall have the fronts of buildings, either attached to the
park or across a street, facing onto the space to the maximum extent possible, but may
have the side or rear of a building or lot front onto the space. The side or rear of a building
or lot fronting onto the Community Green Space and Community Open Space shall be
designed with a secondary frontage and entrance along the space.
4. Disposition: The character of the design of the Community Green Space and Community Open
Space.
a. Natural: Civic spaces with natural character are designed in a natural manner with no
formal arrangement of elements.
b. Formal: Civic spaces with a formal character have a more rigid layout that follows
geometric forms and have trees and other elements arranged in formal patterns.
c. Informal: Civic spaces with an informal character have a mix of formal and natural
characteristics.
5. Food Production: Community Gardens and other Community Green Space and Community Open
Spaces may be used to grow food. See Section 8.4.3 for specifications and requirements.
Created: 2023-12-08 08:25:13 [EST]
(Supp. No. 1)
Page 26 of 43
7.4.4 DESIGN OF COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACES
A. Design Standards for Community Green Space and Community Open Space: Land used as Community
Green Space and Open Space shall meet the following design standards:
1. Location:
a. Where relevant and appropriate, the land shall be located so as to be readily accessible and
usable by residents and users of the development. To the maximum extent practicable, a
portion of the open space shall provide focal points for the development.
b. Common space set aside for children's play areas and other recreational activities shall be
clearly visible from the dwelling units on the site.
c. The land shall, to the maximum extent practicable, be located to adjoin, extend, and
enlarge any open areas, trails, parks, or other open space resources that exist or are
planned within or adjacent to the development.
2. Provision in Multi-Phase Developments: In multi-phase developments, open space Manuals may
be calculated either by phases, or by collectively looking at the development as a whole.
B. Accessory Structure Standards: All accessory structures within parks and open spaces — including, but
not limited to, restrooms, open-air pavilions, gazebos, picnic shelters, and outdoor theaters — shall not
be subject to the physical requirements of the building form or siting standar ds in Article 2 (Map and
Districts). They shall be designed to be consistent with the character of the district in which they are
located. Such consistency may require accessory structures to maintain building setbacks, fro ntage,
massing, disposition, and character similar to adjacent development as determined by the
administrator.
7.4.5 OWNERSHIP AND MAINTENANCE OF COMMUNITY GREEN SPACE AND COMMUNITY
OPEN SPACE
A. Open space areas or other community facilities shall be preserved and maintained in accordance with
the approved:
1. Development Design, in accordance with Section 9.8;
2. Special Exception, in accordance with Section 9.13; or
3. Subdivision, in accordance with Section 9.9, whichever is appropriate.
B. Provision must be made by the property owner to ensure preservation and long term maintenance and
management of Community Green Space and Community Open Spaces through one of the following
mechanisms:
1. Conveyance of the land to a property owners' or homeowners' association that holds the land in
common ownership and will be responsible for managing and maintaining it for its intended
purposes.
2. Conveyance of the land to a third-party beneficiary, such as a nonprofit environmental or civic
organization, that is organized for, capable of, and willing to accept responsibility for managing
and maintaining the land for its intended purpose.
3. Dedication of the land to the city or other appropriate public agency that is organized for,
capable of, and willing to accept responsibility for managing and maintaining the land for its
intended purposes.
Revised: 12/23/2024
(Supp. No. 1)
Page 27 of 43
C. All methods utilizing private ownership shall require deed restrictions, covenants, or other legal
instruments that ensure continued use of the land and facilities for their intended uses, and provide for
the continued and effective management, operatio n, and maintenance of the land and facilities.
D. Failure to maintain Community Green Space and Community Open Space areas or other community
facilities shall be a violation of this Code subject to the remedies and penalties in Article 12 (Violations
and Enforcement).
E. If the owner of an Community Green Space and/or Community Open Space fails to maintain it in
reasonable condition, and in accordance with approved plans, and fails to correct deficiencies cited by
the city, the city shall have the authority to correct the deficiencies per the City's Code of Ordinances at
the owners expense.).
7.5: SUBDIVISION AND SITE PLAN STANDARDS
7.5.1 GENERAL PROVISIONS
The provisions of this Section shall apply to any and all subdivision of land , or site plan within the municipal
boundaries of the City, unless expressly and specifically exempted or provided otherwise in this Code. No
development shall be undertaken without prior approval or authorization pursuant to the terms of this Code.
All development shall comply with the applicable terms, conditions, requirements, standards and procedures
established in this Section and the Code. The submittal of an application for approval pursuant to the
provisions of these Subdivision Regulations constitutes consent to , and agreement to comply with, all of its
applicable provisions.
This Section establishes procedural and substantive rules for obtaining the necessary approval to develop
land and construct buildings and structures. Development applications will be reviewed for compliance with
the City’s Comprehensive Plan, Civic Master Plan, Beaufort Preservation Manual, and this Code.
Scheduling of the review of development applications before Staff, TRC, the Planning Commission or City
Council is at the discretion of the City. Any change to a development application by an Applicant after formal
submittal of that application to the City constitutes a decision by the Applicant that may result in the City
deciding to vacate the Hearing and/or void the pending application. The City may then reschedule or cancel
the review of the development application at its discretion.
Prior to formal submittal of any subdivision application identified in this Section, the Planning Department
will typically provide to an applicant an individualized submittal checklist indicating the documents and
information needed, quantities of those documents to be submitted, and the referral agencies that will be
involved in the review process. The applicants are responsible for being fully familiar with all applicable
provisions of these Subdivision Regulations. Upon determination by staff that a sub mittal constitutes a
complete development application, the City will forward the packets to each referral agency.
7.5.2 SUBDIVISION TYPES AND PROCESS OUTLINES
Methods of land subdivision. There are two ways to subdivide land based on the magnitude of scale: Minor
Subdivision and Major Subdivision.
A. Minor Subdivisions.
Definition. A Minor Subdivision is a subdivision, or amendment to a subdivision, which has been
previously platted, includes no additional public right -of-way dedication, and includes one or more of the
following:
Revised: 12/23/2024
(Supp. No. 1)
Page 28 of 43
1. The boundaries of six five or fewer lots are created from one parent tract or lot, no further
subdivisions shall be allowed from any lot created or the parent tract ;
2. Any lot line adjustment;
3. A consolidation of multiple lots into one when a new street or street change is not involved.
B. Major Subdivisions.
Definition. A Major Subdivision is a subdivision which includes one or more of the following:
1. Dedication of public right-of-way, public infrastructure or other public tracts , or a private road; or
2. The subdivision consists of six or more lots or tracts.
3. The creation of lots on property that has never previously been platted.
7.5.3 SKETCH PLAN
A. Sketch Plan purpose. The Sketch Plan is a conceptual design of the development submitted with a major
subdivision application, that depicts what the applicant envisions for the overall development, including
zoning, transportation, pedestrian network, parks, tree canopy, open space, and other amenities. The
purpose is to allow the Applicant, the Planning Commission, and the Community the opportunity to
discuss the conceptual subdivision before it goes through the major subdivision platting process.
B. Requirements. A Sketch Plan shall be submitted and provided to staff is in advance of a any public and/or
community meeting for all major subdivisions. Major proposed changes to any approved preliminary
plat(s), may require a new Sketch Plan approval if the Code Administrator determines the changes are
significantly different from the sketch plan discussed at the public meeting .
The Sketch Plan shall consist of the following elements:
1. Road plan: The applicant shall provide a preliminary traffic plan that addresses the following
elements:
a. i. The proposed street network and connectivity to the existing road network, including all
proposed access points.
b. ii. The location and layout of all arterial and collector roads within the development.
c. iii. A current preliminary traffic impact study prepared by a licensed traffic
engineer which evaluates proposed access points, the existing street system, and any
need for any road improvements (including off -site improvements) created by the
proposed development.
2. Open space plan: The applicant shall provide a preliminary open space plan that depicts compliance
with Section 7.4 of this code, with the following e lements:
a. i. Proposed open space distribution and location, including percentage of open space.
b. ii. Compliance with 7.4.2 Community Green Space and Community Open Space
Requirement.
c. iii. Required buffer areas as per Section 5.5.1.
d. iv. Wetland areas and setbacks as determined by SCDES-BCM, if applicable.
e. v. Proposed park locations, acreage, and types of parks as per Section 7.4.
3. Pedestrian network:
a. i. Location of all trails within development, and connection to existing trail network.
b. ii. Connectivity of sidewalks to the existing pedestrian system, including any off -site
sidewalk improvements. This includes planning for a one -quarter mile pedestrian shed.
Commented [CK2]: Dianne Farrelly: “(…) are we still
considering approvals of Sketch Plans?”
Revised: 12/23/2024
(Supp. No. 1)
Page 29 of 43
c. iii. Depiction of any bike lanes or any other multi -modal features.
4. Zoning/Design:
a. i. The location of zoning boundaries shall be provided with the application and depicted
on the Sketch Plan.
b. ii. The plan should show how the zoning is harmonious with the surrounding area, and
within the property itself.
c. iii. Conceptual building design and massing.
5. Overall utility plan:
a. i. A letter from the appropriate utility, confirming the existing capacity of the surrounding
utility system, and the future capacity of the utility system for the proposal. Utility plans for
the interior of the development (such as water and sewer service lines) are not required as
part of this process.
b. ii. Proposed connections to the existing utility system.
C. Sketch Plan application submittal. The applicant shall submit a complete Sketch Plan application package
to the City. The application package shall include the following items:
1. Development application form, fee.
2. Title commitment. The title commitment must be dated no more than 90 days from the date of
Sketch Plan application submittal.
3. Title of project.
4. North arrow, scale (not greater than one inch equals 200 feet) and date of preparation.
5. Vicinity map.
6. Legal description.
7. Acreage of property; acreage in each zoning district; acreage in parks; acreage in open space.
8. USGS topographic contours.
9. Location and approximate acreage of proposed land uses.
10. Existing easements and rights-of-way on or adjacent to the property
11. Existing streets on or adjacent to the property (show and label street name).
12. Note or table indicating how public dedication requirements will be met.
13. Table providing the following information for each proposed land use area: total acreage; proposed
density proposed number of dwelling units and/or commercial buildings.
14. Location and acreage of proposed open space and parks as per Section 7.4., trails, regional trail
connections, playgrounds, schools or other public uses.
15. Proposed street system depicting the location and layout of all arterial and collector roads within
the development.
16. A preliminary traffic study prepared by a licensed traffic engineer which evaluates proposed access
points, the existing street system, and any need for any road improvements (including off -site
improvements) created by the proposed development.
17. Floodplain boundary with a note regarding the source of information (if a floodplain does not exist
on the property, this must be stated).
18. Zoning on adjoining properties.
Revised: 12/23/2024
(Supp. No. 1)
Page 30 of 43
19. A letter from the appropriate utility, confirming the existing capacity of the surrounding utility
system, and the future capacity of the utility system for the proposal. Utility plans for the interior
of the development (such as water and sewer service lines) are not required as part of this
process.Utility Plans for the interior of the development (such as water and sewer service lines) are
not required as part of this process.
20. Proposed connections to the existing utility system.
21. The location of any proposed or required lift stations.
22. Design rationale — description of how the development is integrated with surrounding area, how it
responds to site features/constraints and how it is consistent with this Code.
23. General description of plan for drainage and storm water management, including any regional
drainage solutions.
24. Description of how the proposed development complies with the City Comprehensive Plan.
D. Application certification of completion. Within 30 days, staff shall either certify the application is
complete and in compliance with all submittal requirements or reject it as incomplete and notify the
applicant of any deficiencies. Applicant shall then correct any deficiencies in the applicat ion package and
re-submit the application to the City.
E. Sketch Plan Process.
1. Planning Commission Meeting. The Planning Commission shall hold a public meeting to discuss
review and provide comments on the Sketch Plan.
2. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting by regular mail to neighboring property owners within 500 feet of the
property per this Code.
F. Sketch Plan review criteria. The Planning Commission shall use the following criteria in addition to other
applicable provisions of this Code to evaluate the applicant's application:
1. The land use mix within the project conforms to Be aufort's Zoning District Map and Comprehensive
Plan Preferred Land Use Map and furthers the goals and policies of the Comprehensive Plan.
2. The Sketch Plan represents a functional system of land use and is consistent with the rationale and
criteria set forth in this Chapter, the City’s Comprehensive Plan, and the Civic Master Plan as
amended.
3. The preliminary traffic, open space, park, utility, and pedestrian design is adequate and functional
given the existing and planned capacities of each system, and meets the standards found in this
Code.
4. The conceptual design and massing proposed is consistent with the requirements of the
Development Code.
G. Timeframe related to approval of Sketch Plan. A Sketch Plan is in full force and effect for a period of 12
months from date of Planning Commission action.After a period of 12 months has passed without
submittal of a Preliminary Plat application, the Codes Administrator may require an applicant to submit a
new Sketch Plan application for Planning Commission review.
H. Minor amendments. Minor amendments to the Sketch Plan may be approved administratively under the
following conditions:
1. Does not change any land use, or location of any land use.
Commented [CK3]: Comment from Bill Bardenwerper: “Is
this the notice standard we want?”
Commented [CK4]: Rewrite as suggested by Bill
Bardenwerper.
Revised: 12/23/2024
(Supp. No. 1)
Page 31 of 43
2. Does not change the number of lots or density by more than ten percent.
3. Does not contain significant changes in arterial or collector street alignment and/or access points,
or other major public elements such as drainage improvements, utility lines or facilities.
4. Does not change any measurable standard (other than above), such as open space, or park area, by
more than ten percent.
7.5.4 PRELIMINARY PLAT
A. Preliminary Plat purpose. The purpose of the preliminary plat is to provide the City with an overall plat
and the associated preliminary engineering for the proposed development.
B. Preliminary Plat application process.
1. Pre-application conference. A pre-application conference/TRC with the City is required before the
applicant may submit a preliminary plat application. Topics to be discussed will include:
a. The provisions of this Code and the applicable requirements;
b. The application and review process;
c. Submittal requirements; and
d. Changes or modifications based on direction from the Planning Commission at Sketch Plan
approval.
2. Preliminary Plat application submittal. Following approval or conditional approvalreview of the
sketch Sketch planPlan, the applicant may submit the complete preliminary plat application to the
City. The preliminary plat application package shall be formatted and packaged per the application
submittal checklist provided by the City and include the following items in both printed and
electronic formats:
a. Development application form;
b. Application fee;
c. Title commitment. The title commitment must be current and dated no more than 120 days
from the date of preliminary plat application submittal ; and
d. The preliminary plat that shall provide the following information:
i. Title of project.
ii. North arrow, scale (not greater than one inch equals 100 feet) and date of preparation.
iii. Vicinity map.
iv. Names and addresses of owners, applicant, engineers and surveyors.
v. Legal description.
vi. Total acreage of property.
vii. Existing contours at two-foot intervals (based on USGS datum).
viii. Name and location of abutting subdivisions or owners of abutting property (if land is not
platted)
ix. Lots, blocks, and street layout (with cross-sections), dimensions and square footage for
each lot. Dimensions and square footages may be rounded to the nearest whole
number.
x. Consecutive numbering of all lots and blocks.
xi. Existing and proposed easements (including rights -of-way) on and adjacent to the
property.
xii. Existing and proposed zoning on and adjacent to property.
xiii. Approximate location and size of existing sewer lines, water lines and fire hydrants.
Approximate location of proposed sewer lines, water lines, and fire hydrants with a
letter from BJWSA and the Fire Marshall.
Revised: 12/23/2024
(Supp. No. 1)
Page 32 of 43
xiv. Location by field survey or aerial photography of existing and proposed water courses
and bodies of water such as irrigation ditches and lakes. Water courses shall include
direction of flow.
xv. Tree Survey and with Existing Tree Canopy Survey.
xvi. Floodplain boundary with a note regarding source of information (if a floodplain does
not exist on the property, state this on the plan).
xvii. The boundaries of proposed phases of the subdivision if the final plat is intended to be
submitted in multiple phases.
xviii. General location of existing surface improvements such as buildings, fences, or other
structures which will remain on the property as part of the subdivision.
xix. Location and acreage of proposed parks, trails, playgrounds, schools or other public
uses.
xx. Location, function, ownership and manner of maintenance of any private open space.
xxi. Land use table including land uses, approximate acreage of each land use type,
percentage of each land use type density (net and gross) and how public dedication
requirement will be met.
xxii. Total number of lots.
xxiii. Number of each type of dwelling unit proposed.
xxiv. An AutoCad drawing file of the Preliminary Plat in a format specified by the City
Engineer or Codes Administrator.
xxv. Surveyor's certificate.
xxvi. Traffic impact analysis (if applicable) as per the requirements found in
this development code.
3. Preliminary Plat drawing standards. The preliminary plat drawing shall comply with the following
standards:
a. The preliminary plat shall be prepared by or under the direct supervision of a registered land
surveyor, shall be signed and stamped by said surveyor, and shall meet applicable State of South
Carolina requirements.
b. Except for parcels separated by easements (including public rights -of-way), public tracts, or
railroads, parcels not contiguous with each other shall not be included in one plat, nor shall
more than one plat be made on the same sheet. Contiguous parcels owned by different parties
may be included on one plat, provided that all owners join in the dedication and
acknowledgment.
c. Lengths on the preliminary plat boundary shall be shown to the nearest hundredth of a foot and
bearings shall be shown in degrees, minutes and seconds.
d. Bearings, distances and curve data of all perimeter boundary lines shall be indicated outside the
boundary line, not inside, with the lot dimensions.
e. Names and signatures of all owners of equitable interest in the property shall be on the
preliminary plat and shall be made in black drawing ink.
4. General development information. A written description of the existing conditions on the site and
the proposed development, including the following items:
54. Explanation of how the plat is consistent with this Code, the Comprehensive Plan , the Civic
Master Plan, and the Sketch Plan.
65. Preliminary grading and drainage plan and report. This plan and report must be certified by a
South Carolina registered professional engineer or Land Surveyor and include approximate
earthwork quantities (how earthwork on the site is "balanced"), storm drainage concepts such as
Revised: 12/23/2024
(Supp. No. 1)
Page 33 of 43
locations of pipe and other conveyance facilities, locations for on -site detention or downstream
structural improvements, and soil erosion and sedimentation control plans and specifications. It
must also discuss the impacts on and to any existing floodways and/or floodplains both on and
adjacent to the site as well as any FEMA applications or approvals that may be required.
76. Preliminary water and sewer plan and study. This plan shall be prepared by a registered
professional engineer. It is necessary that the engineer consult with the appropriate utility service
providers regarding the design of all utilities through the subdivision.
87. Preliminary landscape and open space plan. The landscape plan must address the treatment of all
exterior spaces. Landscape plans are to be designed to meet the requirements of this Code and
show approximate locations of trees, shrubs, groundcovers, turf, buffering, fences, walls and other
site amenities that will be included in the plan.
98. Traffic study. A TIA with requirements consistent with Section 7. 3.2. This study must be prepared
by a professional traffic engineer and identify the projected impacts to the local and regional traffic
system. The direct roadway impacts and proposed share in the cost of regional improvements and
intersections must be identified for the project.
109. Archaeological Impact Assessment. An applicant may be required to provide the City as per
Section 8.4 with a CHS records listing historically or archaeologically significant findings on the
property being subdivided at their expense.
1110. General ecological resource survey. Prepared by a qualified biologist, geologist, ecologist, or
similar qualified professional, a survey identifying the potential/absence/habitat of a threatened or
endangered species and wetlands or other ecologically sensitive area. Said survey shall make
practical recommendations regarding treatment or mitigation of the findings.
1211. Conceptual Design. Applicant should provide conceptual design and massing examples, (i.e.
conceptual elevations, but not required for each individual lot ) , consistent with the requirements
of the Development Code
C. Planning Commission Hearing. The Planning Commission shall hold a public hearing to approve, approve
with conditions or deny the Preliminary Plat.
1. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting hearing by regular mail to neighboring property owners within 500 feet of the
property per this Code.
2. Approval. The Planning Commission shall review and act on the Preliminary Plat. The Planning
Commission shall approve, approve with conditions, or deny the Preliminary Plat based on the
review criteria below.
D. Preliminary Plat review criteria. In addition to all provisions of this Code, the Planning Commission shall
use the following criteria to evaluate the applicant's request:
1. a. The Preliminary Plat represents a functional system of land use and is consistent with the
rationale and criteria set forth in this Code.
2. b. The land use mix within the project conforms to the City’s Development Code and complies with
the Comprehensive Plan and Civic Master Plan.
Revised: 12/23/2024
(Supp. No. 1)
Page 34 of 43
3. c. The utility and transportation design are adequate, given existing and planned capacities of those
systems.
4. ivd. Lot layout, including structure location and design of each lot.
E. Phasing. The preliminary plat shall designate the boundaries of phases for which separate final plats will
be presented for approval. Each phase, either alone or in conjunction with previously approved and
recorded phases, must meet all of the requirements of this Code.
F. Early grading. After approval of a Preliminary Plat, Applicant may proceed with preliminary grading of
the project area if a construction plan set for grading and drainage is approved and memo authorizing
grading work is issued by the City Engineer or Codes Administrator. Early grading and storage of
construction related equipment is at the risk of the Applicant and no presumption of any Final Plat
approval at the Planning Commission is expressed or implied by any authorization of early grading.
G. Timeframe related to approval of Preliminary Plat. A preliminary plat is in full force and effect for a
period of two years from date of approval. Approval will automatically expire at the end of t wo years
unless an applicant formally requests an 18 month extension from the Planning Commission prior to
termination or submits a completed final plat application for all or a portion of the property.
7.5.5 FINAL PLAT
A. Final Plat purpose. The purpose of the final plat is to complete the subdivision of land consistent with
the technical standards of the City of Beaufort.
B. Final Plat application process.
1. Final Plat application submittal. The final plat application shall substantially conform to the
preliminary plat as approved at the public hearing and shall meet all conditions of approval. The
applicant shall submit the completed final plat application package to the City. The final plat
application shall be formatted and packaged per the application submittal checklist provided by the
City and include:
a. Development application form.
b. Application fee.
c. Title commitment. An updated title commitment, dated no more than 120 days from the date
of final plat application submittal.
2. Final Plat Standards. The final plat drawing shall comply with the following standards:
a. All requirements of Section 7.5.4.
b. The plat shall be prepared by or under the direct supervision of a registered land surveyor,
shall be signed and stamped by said surveyor, and shall meet applicable State of South
Carolina requirements.
c. Existing and proposed easements (including rights -of-way) in and adjacent to property (labeled
and dimensioned).
d. Existing and proposed street names for all streets on and adjacent to the property.
e. Final Traffic Impact Analysis (if applicable) as per the requirements found in the Development
Code.
Revised: 12/23/2024
(Supp. No. 1)
Page 35 of 43
f. If applicable, prior to commencement of construction; a State Highway utility permit from
SCDOT.
g. If applicable, prior to commencement of construction, a State Highway access permit from
SCDOT.
h. If applicable, prior to commencement of construction, a construction dewatering permit from
DHEC
i. If applicable, prior to commencement of construction, a 404 Permit from the Army Corps of
Engineers.
j. Prior to commencement of construction, acceptable collateral in the amount and form
stipulated in Section 7.1.5.
3. Original plats. The applicant shall submit to the City, five original, signed copies of the final plat
ready to record, and final executed copies of all agreements.
4. Complete engineering plans and specifications. As a condition of Final Plat approval the applicant
shall prepare and submit the following:
a. Construction plans and profiles. The plans and profiles shall be prepared by a registered
professional engineer licensed in the State of South Carolina. Plans shall be 24 inches high by
36 inches wide and provide the following information:
b. The horizontal to vertical scales shall be chosen to best depict the aspects of the design.
c. Minimum horizontal scale: One inch equals 100 feet.
d. Minimum vertical scale: One inch equals ten feet.
e. The typical road geometric and structural cross -section is to be shown on each plan sheet.
f. The plan must show right-of-way lines and widths, road names, lot lines, tangent lengths and
bearings, curve radii, delta angles, curve lengths, chord lengths and bearings, stationing at all
beginning of curves and end of curves, intersections, structures, angles, curb lines, cross pans,
traffic control devices (islands, striping, signs, etc.), drive cuts, curb returns and radii, and all
other features to enable construction in accordance with approved standards and standard
engineering practice. Stationing may be centerline if approved by the City Engineer or Codes
Administrator. Construction plans shall include water lines and appurtenances, sewer lines and
appurtenances, and storm water lines and appurtenances and any other wet utilities .
g. The profiles shall include existing and proposed grade at curb and gutter or centerline of street
elevation at point of intersection of vertical curves, intersections, grade breaks, point of curb
return (PCR), point of reverse curve (PRC), and other critical points, structures, and all other
features.
h. Signature blocks for all utility providers unless otherwise provided in agreement form.
i. Structure details. Sufficient data shall be given to construction of major structures and road
appurtenances such as bridges, culverts, gutters, drives, walks, cross pans, etc; detail shall
include orientation line and grade, cross-sections, dimensions, reinforcement schedules,
materials, quality specification, etc., or as the City Engineer may approve.
j. Final Water Report. A final water report including hydraulic analysis and pipe sizing
calculations. Note, this report can be verified by BJWSA and does not need to be submitted to
the City.
Revised: 12/23/2024
(Supp. No. 1)
Page 36 of 43
k. Final Sanitary Sewer Report. A sanitary sewer report including hydraulic analysis and pipe
sizing calculations. Note, this report can be verified by BJWSA and does not need to be
submitted to the City.
l. Sewage collection and water supply distribution plans, profiles and specifications. The plans,
profiles and specifications shall be prepared by a registered professional engineer and shall be
accompanied by written approvals from BJWSA.
m. Final drainage plans and reports. Based upon the approved preliminary drainage plan, a final
report is to be submitted in accordance with SOLOCO Drainage and Design Criteria, as
amended or as the City Engineer may approve. The plan and report must provide:
n. Erosion control plans, when required.
o. Sizing of all pipes, inlets, conveyance ways, and other appurtenances.
p. Final grading plan. The final grading plan shall be 24 inches high by 36 inches wide and
illustrate existing and proposed contours and lot and block grading details.
q. Soils report. The soils report shall detail pavement design and construction requirements and
shall be submitted after overlot grading is complete.
r. Final landscape and open space plan. The landscape plan must address the treatment of all
exterior spaces. Landscape plans are to be designed to meet the requirements of this Code and
show trees, shrubs, groundcovers, turf, buffering, fences, walls and oth er site amenities that
will be included in the plan. All plant materials must be adapted to the physical limitations of
the local climate and specific conditions of the landscape plan. All plant materials must meet
specifications of the American Associatio n of Nurseryman for number one grade. All street
trees must be selected from the City of Beaufort recommended tree list.
s. Landscape Plan drawn to scale (not greater than one inch equals 50 feet) on 24 by 36 -inch
sheets which includes:
i. Project name.
ii. Scale, north arrow and date of preparation.
iii. Existing and proposed streets and street names.
iv. Lot lines, easements and public rights-of-way as shown on the subdivision plat, including
gross and net area of all parcels.
v. Location of proposed building footprints and parking areas.
vi. Location of storage, loading and service areas.
vii. Existing and proposed two-foot contours (based on USGS datum).
viii. Natural features, wetlands, wildlife corridors, floodplains, streams, ditches and other
waterways.
ix. The location of existing and proposed utilities. Utility lines can be 'ghosted' in on the
landscape plan to vary the line types for cleaner drawings.
x. All existing trees within the proposed site and adjacent to the site must be accurately
identified on the plan. Existing trees must be labeled as to their size, species and if they
are intended to remain, be removed or transplanted. All replacement mitigat ion trees
will need to be shown separately on the plan. Tree protection standards for existing
trees to remain shall be included on the plan.
Revised: 12/23/2024
(Supp. No. 1)
Page 37 of 43
xi. The extent and location of proposed trees, shrubs and perennials and quantities of each
species. Plant materials are to be drawn at two -thirds of their mature size.
xii. Landscape schedule including the represented plant symbol, Latin name, common
name, planting size and number of individual plants. All plant materials are to meet the
minimum size requirements as provided in this Code.
xiii. Proposed treatment of all ground surfaces must be clearly indicated, including turf,
paving, mulch, native grass, seeded grass, etc. Grass areas are to be specified as seed or
sod, and a seed mix/rate specified.
xiv. Sight distance triangles must be shown at street intersections pursuant to this Code.
xv. Project specific landscape notes and details to ensure the proper planting,
establishment and survival of plant materials. Additional notes detailing the warranty
for plant materials and continued maintenance shall be included.
xvi. Open space and pedestrian circulation system.
xvii. Proposed grading of the project site, including drainage swales, detention basins,
retaining walls and any off-site infrastructure improvements.
xviii. Notes for conservation and retention of topsoil and landscape soil preparation.
xix. Restoration, revegetation or enhancement of disturbed natural areas or open space
feature.
xx. Park structures, signage, play equipment, and other landscape or park amenities and
appurtenances.
xxi. A "pdf" file and an AutoCad drawing file of the final plat in an electronic format
specified by the City Engineer.
5. Post approval actions. Prior to issuance of a building or grading permit, the applicant shall submit
the following documentation to the City:
a. List of contractors. List of all contractors that will be performing the improvements.
b. Proof of insurance/business license. Proof of workman's comprehensive insurance and liability
insurance for each contractor and business license.
c. Open space deed restriction. Areas designated as open space shall be protected by a deed
restriction or other appropriate method to ensure that they cannot be subdivided or
developed in the future and will remain as open space until the use is modified by the City.
d. Construction traffic control plan. Applicant will develop a plan for City Engineer, Codes
Administrator or appointee, review that addresses construction traffic, construction water,
temporary road closures, street repairs, dust, noise and other construction -related concerns.
e. Other certificates, affidavits, enforcements or deductions as required by the City.
C. Approval. The City Codes Administrator shall review and act on the Final Plat. The Codes Administrator
may choose to approve, approve with conditions, or deny the Final Plat based on the criteria below.
1. Final Plat review criteria. In addition to all provisions of this Code, the Codes Administrator uses
the following criteria to evaluate the applicant's final plat application:
Revised: 12/23/2024
(Supp. No. 1)
Page 38 of 43
a. The Final Plat is in substantial conformance with the approved Preliminary Plat. For the
purposes of this Code, "substantial conformance", includes design adjustments made to meet
any conditions of preliminary plat approval, and is determined as follows:
b. Does not change any land use.
c. Does not contain changes which would render the final plat in nonconformance with
requirements of this Code.
d. Does not contain significant changes in street alignment and/or access points, or other public
elements such as drainage improvements, utility lines or facilities.
e. Does not increase density by more than 15 percent.
D. Timeframe related to approval of Final Plat. A final plat is in full force and effect for a period of two
years from date of recordation unless a longer timeframe is specifically allowed by the City in an
approved Development Agreement or unless public improvements are completed and accepted on all or
a portion of the final plat. Applicants may formally request one 18 month extension from the Codes
Administrator prior to termination of final plat approval. Prior to the expiration of the original two year
timeframe or the extension timeframe, an applicant may formally request an additional extension if
substantial progress has been made on installation of public improvements.
7.5.6 MINOR SUBDIVISION PLAT
A. Minor Subdivision Plat purpose.
1. The purpose of the Minor Subdivision Plat is a subdivision, or amendment to a subdivision, which
has been previously platted, includes no additional public right -of-way dedication, and includes one
or more of the following:
a. The boundaries of five or fewer lots are created from one parent tract or lot, cumulatively and
not more than 3 acres; (ex. any portion of a tract that is subdivided counts toward the five
total, and does not itself become a new parent tract to subdivide an additional five lots from)
b. Any lot line adjustment, consolidation of multiple lots into one.
B. Minor Subdivision plat application submittal. The applicant shall submit the complete Minor Subdivision
plat application package to the City. The application shall be formatted and packaged per the application
submittal checklist provided by the City and include:
1. Development application form.
2. Application fee.
3. Title commitment. A current title commitment, dated no more than 30 days from the date of minor
subdivision plat application submittal
C. Minor Subdivision plat standards. The plat drawing shall comply with the following standards:
1. The plat shall be prepared by or under the direct supervision of a registered land surveyor and
meet applicable State of South Carolina requirements.
2. Except for parcels separated by public rights -of-way, public tracts, or railroads, parcels not
contiguous shall not be included in one plat, nor shall more than one plat be made on the same
Commented [CK5]: Numerical order at this sub-level!
Revised: 12/23/2024
(Supp. No. 1)
Page 39 of 43
sheet. Contiguous parcels owned by different parties may be included on one plat, provided that all
owners join in the dedication and acknowledgment.
3. Lengths shall be shown to the nearest hundredth of a foot and bearings shall be shown in degrees,
minutes and seconds.
4. Bearings, distances and curve data of all perimeter boundary lines shall be indicated outside the
boundary line, not inside, with the lot dimensions.
5. All signatures shall be made in black drawing ink.
6. Title of project.
7. North arrow, scale (not greater than one inch equals 100 feet) and date of preparation.
8. Vicinity map.
9. Legal description.
10. Basis for establishing bearing.
11. Names and addresses of owners, applicant, designers, engineers and surveyors.
12. Total acreage of subdivision.
13. Bearings, distances, chords, radii, central angles and tangent links for the perimeter and all lots,
blocks, rights-of-way and easements.
14. Lot and block numbers, numbered in consecutive order, and square footage or acreage to two
decimal places of each lot or tract.
15. Parcels excepted from inclusion noted as "not included in this subdivision" and the boundary
completely indicated by bearings and distances.
16. Existing rights-of-way in and adjacent to subject property (labeled and dimensioned).
17. Existing and proposed street names for all streets on and adjacent to the property.
18. Existing easements and their type in and adjacent to subject property (labeled and dimensioned).
19. Location and description of monuments :
i. Floodplain boundary with a note regarding source of information (if a floodplain does
not exist on the property, please state this on the plat).
20. Certificates blocks for signatures of owner, surveyor, utility providers, and City approval, as
applicable.
D. Record Minor Subdivision Plat. Five signed copies of the minor subdivision plat shall be delivered to the
City. The applicant will be responsible to record the minor subdivision plat with Beaufort County.
7.5.7 SITE PLAN
A. Site Plan Purpose. The site plan is a prerequisite to a building permit for all multi -family (excluding
duplexes), commercial, and industrial developments. The site plan shows how the lot will be developed
so that the City can ensure that the site design will be in complia nce with the Development Code,
Comprehensive Plan and Civic Master Plan .
B. Site Plan Application. A Site Plan Application shall include the following:
Commented [CK6]: Numerical order at this sub-level!
Revised: 12/23/2024
(Supp. No. 1)
Page 40 of 43
1. Land use application form.
2. Application fee and fee agreement.
3. Site Plan plat — The site plan shall be a minimum of 18 inches by 24 inches and shall provide the
following information:
a. Title of project.
b. North arrow, scale (no greater than one inch equals 50 feet) and date of preparation.
c. Vicinity map.
d. Address of project.
e. Legal description of property.
f. Name, address and phone number of property owner.
g. Name, address and phone number of person or firm responsible for plan.
h. Lot size (square footage).
i. Bearings and distances of all lot lines.
j. Existing and proposed easements and rights -of-way.
k. Existing and proposed paved areas and sidewalks on the site and in the adjacent rights -of-way, all
dimensioned, showing how pedestrians will have access to the site and buildings.
l. Gathering areas for people.
m. Existing and proposed curb cuts on the site and in the adjacent rights -of-way (on both sides of
perimeter streets), all dimensioned.
n. Existing and proposed two-foot contours.
o. Existing waterways on or adjacent to the site.
p. Finished floor elevations for all structures.
q. Footprint (including roof overhangs and eaves, decks, balconies, outside stairs and landings) of all
proposed structures and their use with their dimensions and locations noted with respect to the
property lines.
r. Existing structures and their use.
s. Square footage of the proposed building(s) and the footprint of the proposed building(s).
t. Proposed structure height.
u. For multi-family residential, the number of residential units and bedrooms per unit.
v. Location of proposed signs and lighting.
w. Specifications for the signs and lights, including type, height and general conformance to the
Code. For commercial and industrial uses, a photometric plan prepared by a qualified electrical
or lighting engineer shall be submitted that depicts all lighting fixtures and the light spread (in
footcandles) of these fixtures across the site to all property boundaries.
x. Proposed traffic controls and striping for parking areas (all lanes, driveways, and parking spaces
must be dimensioned).
y. Trash disposal areas and enclosures including specifications for enclosures.
Revised: 12/23/2024
(Supp. No. 1)
Page 41 of 43
z. Location and size of existing and proposed water and sewer service connections and tap sizes.
aa. Location and size of water and sewer lines to which the service connections will be or are made.
bb. Location and size of water meter(s).
cc. Location and size of backflow-prevention devices.
dd. Indication of how and where perimeter drain will drain (if one exists).
ee. Location of existing electrical lines and poles on or adjacent to the site.
ff. Location of proposed electrical service connection and meter location.
gg. Location of electric transformer.
hh. Location of all fire hydrants. If none exist on site, note distance and direction of the closest
hydrant adjacent to the site within 500 feet.
ii. Location of detention/retention areas and storm sewer infrastructure with the required drainage
easements.
jj. The distance from the proposed building(s) or structure(s) to adjacent lot lines, easements, and
adjacent structures.
kk. A land use chart (table).
ll. Certificate blocks for signatures of owner, surveyor, utility providers, and City approval, as
applicable.
4. Design standards — Demonstrate in written or graphic form how the proposed structure(s) is
consistent with the design requirements of this code. Provide Exterior elevations of proposed
structures/graphic visual aids. Provide complete building elevations, drawn to scale, with
illustrations of all colors and identifying major materials and cut sheets to be used in the
structure(s). In addition, Staff may require buil ding floor plans, sectional drawings, perspective
drawings, models, and/or computer visualizations when the impacts of a proposal warrant such
information.
5. Certified drainage report — A certified drainage report, including an erosion control study and
plan, as applicable, must be reviewed and approved by the appropriate sanitation district (if
applicable) prior to submittal of the report to the City as part of the site plan application.
6. Final landscape and open space plan — Provide an existing and proposed landscape plan with tree
protection zones and a tree survey, and open space plan consistent with this SectionSections 5 and
7 within this Code.
7. Traffic Impact Analysis — Provide TIA as per requirements of Section 7.3.2.
C. TRC and Staff Review. Staff and TRC reviews application and prepares comments. Staff and TRC will
review the site plan map to ensure it is consistent with the site plan review criteria. Following the review,
Staff will prepare a written report outlining any changes that the applicant must make before the site plan
can be recommended for public hearing with the Planning Commission . This report will be forwarded to
the applicant.
1. Applicant addresses staff comments. Applicant shall make all necessary changes to the site plan
and resubmit a revised copy to the City.
Revised: 12/23/2024
(Supp. No. 1)
Page 42 of 43
D. Planning Commission Hearing. The Planning Commission shall hold a public hearing to approve, approve
with conditions or deny the Site Plan as per the following conditions.
1. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting by regular mail to neighboring property owners within 500 feet of the
property per this Code.
2. The Planning Commission shall hold a public hearing on the proposal. The applicant and other
property owners likely to be materially affected by the application shall be given an opportunity to
be heard.
3. Decisions/Findings of Fact: FollowingAt the conclusion of the public meetinghearing, the Planning
Commission may approve, deny, or approve with conditions the application for a Major
Development. No Major Development shall be approved unless the following findings of fact can
beare made:
a. The plan is consistent with the City of Beaufort Comprehensive Plan and Civic Master Plan.
b. The plan complies with all applicable requirements of this Code.
c. There exists adequate infrastructure (transportation and utilities) to support the plan as
proposed.
d. The proposed plan conforms to the character of the neighborhood, considering the location, type
and height of buildings or structures and the type and extent of landscaping on the site.
E. Post approval actions.
1. Building Permit. A building permit shall be issued only when a site plan has been approved.
However, with the approval of the City, an applicant may submit a building permit application
concurrent with the site plan application. Building permits shall not be issued for any development
that is not in conformance with the approved site plan.
2. Phasing and expiration of approval. The site plan shall be effective for a period of three years from
the date of approval, unless stated otherwise in the written site plan approval. Building permits
shall not be issued based on site plans that have an app roval date more than three years old. For
multi-phased plans, building permits shall not be issued based on an approval date more than three
years from the date of Phase I approval.
F. Appeals. Any party aggrieved by the decisions of the Planning Commission may appeal to the Circuit Court
within 30 days of the decision.
G. Permit Validity. Upon the approval of the Major Development Design application, the applicant shall have
2 years to obtain a Project Permit. Failure to secure a permit for the permitted work within this time shall
render the compliance void. Any change to the approved plan s that has not been authorized by the
Administrator shall invalidate the design approval, and any subsequent building permits.
H. Permit Extension. The Administrator may grant a one year extensions of this time period upon submittal
by the applicant of sufficient justification for the extension. Extensions shall be submitted at least 1 month
prior to the expiration date.
I. Amendments to approved Site Plans.
1. Minor variations in the location of structures, improvements, or open space areas caused by
engineering or other unforeseen difficulties may be reviewed and approved by the City Staff. Such
Commented [CK7]: Comment from Bill Bardenwerper:
“This sentence is repeating 2 & 3 below, so delete it.”
Commented [CK8]: Comment by Bill Bardenwerper: “See
new appeals sections I’ve written in Chapter 9.” (therefore
to be stricken)
Revised: 12/23/2024
(Supp. No. 1)
Page 43 of 43
changes shall not exceed ten percent of any measurable standard or modify the use, character, or
density of an approved site plan. All plans so modified shall be revised to show the authorized
changes and shall become a part of the permanent records of the City.
2. Changes to approved site plans that exceed the ten percent threshold, or other major
modifications (such as changes in building size or footprint, relocation of access points, changes to
required parking, etc.), shall be considered as a new site plan appli cation. Such amendments shall
require Planning Commission review and approval to become effective. A complete site plan
application shall be prepared and submitted in compliance with the requirements set forth in this
Section.
DEVELOPMENT CODE
CHAPTER 7 AMENDMENTS
(clean version)
Beaufort, South Carolina, The Beaufort Development Code
7: LAND DEVELOPMENT
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 1 of 41
7: LAND DEVELOPMENT
7.1: IMPROVEMENT REQUIREMENTS
7.1.1 PURPOSE
The purpose of these land development requirements is to:
A. Encourage economically sound and environmentally sensitive development.
B. Assure the timely provision of required streets, utilities, and other facilities and services to new land
developments.
C. Assure the adequate provision of safe and convenient vehicular and pedestrian traffic access and
circulation in and through new land developments.
D. Assure the provision of needed open spaces and building sites in new land developments through the
dedication or reservation of land for recreational, educational, and other public purposes.
E. Assure, in general, the wise and timely development of new areas, in harmony with the Comprehensive
Plan of the city.
F. Encourage new subdivision developments that complement the City's historic development pattern.
G. Promote compact, well-defined, sustainable neighborhoods that enhance the City's character.
H. Create livable neighborhoods that foster a sense of community and reduce dependency on vehicles.
I. Encourage the proper arrangement of new streets in relation to existing or planned streets and
ensure streets facilitate safe, efficient, and pleasant walking, biking and driving.
7.1.2 APPLICABILITY
A. Unless noted otherwise in this section, all new development projects shall be required to have public
sewer and underground wiring and shall comply with Section 7.2.3 (Lot Access Standards).
B. All development — with the exception of projects that qualify as Minor Development Design Review or
Minor Subdivision or are located in the Historic District, and affect less than one whole block face — are
required to install or construct the improveme nts specified in the Table of Required Improvements
(Section 7.1.3).
C. The applicant shall be responsible for the installation and construction of required improvements
according to the provisions of this Code, except as may otherwise be specifically provided herein or by
agreement.
D. Approval of a Final Subdivision Plat shall be subject to the applicant having installed the improvements
designated in this article, or having guaranteed (Section 7.1.5), to the satisfaction of the city, the
installation of said improvement.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 2 of 41
7.1.3 TABLE OF REQUIRED IMPROVEMENTS
ZONING DISTRICT
REQUIRED
IMPROVEMENTS3
SECTION
REFERENCE
T1 T3-S T3-
N
T4-
HN
T4-
N
T5-
DC
T5-
UC
RMX IC LI MHP
Public Water and
Hydrants
7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Public Sewer 7.1.3.B □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Paved Streets1 7.2.4 □ ■ ■ ■ ■ ■ ■ ■ ■
Streetscape2 Appendix C □ ■ ■ □ ■ ■ ■ ■ ■ ■ ■
Underground
Drainage
7.1.3.A □ ■ ■ ■ ■ ■ ■ ■ ■ ■ □
Curb and Gutter Appendix C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Sidewalks 7.2.4.C □ □ □ □ ■ ■ ■ ■ ■ ■ □
Street Trees 7.2.5 □ □ ■ ■ ■ ■ ■ ■ ■ □ □
Street Lights n/a □ □ □ □ ■ ■ ■ ■ ■ ■ ■
Street Signs
(private streets)
n/a ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Underground
Wiring On-Site
7.1.3.C ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Community Green
Space and Open
Space Space
7.4 □ ■ ■ □ ■ □ ■ ■ ■ □ □
■ required improvements by
district
□ may be required at the discretion of the Planning Commission based on
existing conditions, surrounding context, and street section (Appendix C)
1 Rear lanes/alleys may be permitted to be paved with pervious material, such as gravel, depending on the
location.
2 Complete street requirements shall be coordinated with the specific street section found in the regulating
plan in Appendix C.
3 For Infill and Redevelopment, as defined in Section 8.3.2, these items [referring to the table of required
provisions} are required to the extent feasible based on existing conditions including roads, utilities and
adjacent buildings.
A. Street Improvements: Land designated for public streets shall be cleared and filled in accordance with
the latest edition of the "South Carolina Standard Specifications for Highway Construction", South
Carolina State Highway Department, or as determined appropriate by the adm inistrator. No land may
be disturbed until a Project Permit has been issued (Section 9.5). See Section 5.4 for Tree Removal
Standards. See Section 7.2 for more standards on street location. See Appendix C for Street Regulating
Plan and Design Standards.
B. Water and Sewer Facilities: Water and sewer facilities shall be provided in accordance with the standard
procedures and policies of the water and sewer provider and the South Carolina Department of
Environmental Services (SCDES) and shall be approved by the water and sewer provider.
C. Utility lines: All utility lines within a development site shall be installed underground . The Planning
Commission may approve an exception only in cases where there are existing above- ground lines that
serve the property.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 3 of 41
7.1.4 SURVEY AND ENGINEERING
A. Installation of Permanent Reference Points: Permanent reference points shall be placed in accordance
with the following requirements:
1. General Standards: Boundary surveys shall be performed, in accordance with the state minimum
standards published by the State Board of Registration for Professional Engineers and Land
Surveyors, unless more stringent requirements are specified. A minimum of two points in an y
survey must be tied to the state plane coordinate system. The survey may be done on the
horizontal ground distance and tied back to the state plane coordinates.
2. Control Monuments: Vertical control monuments shall be placed in or near the centerline of
pavement of subdivision streets at a minimum of 1 per 4 acres. Where practical, control
monuments shall be placed at points of curvature and points of tangency of curves. The control
monument may be poured on the job or be a concrete marker of the type commonly used in the
area: at least 3 feet long and tapered with a 12 -inch long, ¼ -inch diameter brass or bronze rod
embedded in the top. Control monuments shall be placed in a cast iron water main valve type box
with a cover flush with the pavement.
3. Property Marker: A steel or wrought iron pipe, rebar, or the equivalent, not less than 0.5 inches in
diameter and at least 24 inches in length shall be set at all property corners and points of curves,
except those located by monuments. They shall be flush with the ground.
4. Accuracy: Land surveys within the city limits shall be Class A surveys, set at an accuracy of at least
1:10000.
7.1.5 IMPROVEMENT GUARANTEES
A. Types Allowed: Prior to approval of a Final Subdivision Plat the applicant shall provide a performance
guarantee to ensure the completion of required improvements within a period of time as agreed upon
by the Administrator and the applicant and expressed in the guarantee. Such guarantee may be in the
form of a performance bond, a surety bond, a cash deposit, or a letter of credit. A performance guarantee
shall be posted in the amount of 125% of the total cost of improvements.
1. Performance/Surety Bonds and Letters of Credit: The performance or surety bond, or letter of
credit, shall be in a form acceptable to the city. It shall include a pledge by the bank, insurance
company or other bonding/lending institution that the funds necessary to carry out the terms of
the agreement are guaranteed for payment and will be released only upon receipt of written
instruction from the city.
2. Cash Deposits: If surety is in the form of a cash deposit with the City of Beaufort, proportional parts
thereof shall be refundable in relation to progress payments less retainage, subject to approval of
the city and subject to a minimum deposit balance of 25% of the pr oject cost.
3. Maintenance Guarantees: If the applicant completes all required improvements and complies with
all conditions of the subdivision agreement as determined by the city, the remainder of monies
retained by a financial institution or by the city may be released to the applicant or hi s successor
in title. Prior to release, the applicant shall provide the city, prior to the issuance of any building
permit, a performance bond, a surety bond, or a cash deposit equal to the amount determined by
the city that would ensure the repair of any damage to the existing improvements during the
course of any construction, but in no case will the amount of the security be less than $1,000.00
for each individual building lot. Prior to the issuance of any certificate of occupan cy, the city shall
determine whether or not any breakage or damage has occurred. If no damage to any off -site
improvements has occurred, then the city may release the security to the applicant or his successor
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 4 of 41
in title. If damages have occurred, they shall be repaired, or the city may draw on the security
before it is released.
7.1.6 EASEMENT AND UTILITY STANDARDS
A. Multiple installations within easements: Easements shall be designed to provide efficient installation
of utilities. Public utility installations shall be located as to permit multiple installations within
the easements. The developer will establish final utility grades prior to utility installations. Public utility
easement dedication shall be required with any minor or major subdivision action.
B. Underground utilities: Telephone lines, electric lines, cable television lines and other like utility services
shall be placed underground. The applicant or developer shall be responsible for complying with the
requirements of this Section and shall make the necessary arrangements including any construction or
installation charges with each utility provider for the installation of such underground facilities.
Transformers, switching boxes, meter cabinets, pedestals, ducts and other facilities necessaril y
appurtenant to such underground utilities shall be placed underground or on the surface but not
on utility poles. Screening or fencing is required subject to approval of the City. Electric transmission and
distribution feeder lines and necessary appurtenances thereto may not be placed above ground unless
they are carrying greater than 115 kV. Upon approval of the City, such facilities shall be placed
within easements or rights-of-way provided for particular facilities.
7.2: STREET NETWORK AND DESIGN STANDARDS
7.2.1 STREET INFRASTRUCTURE PLANS
A. Purpose and Intent: The Street Infrastructure Plans (in Appendix C) provide diagrams of the city's street
network and establishes the ideal alignment, hierarchy and design characteristics - including total right-
of-way width, sidewalk and streetscape amenities, parking lanes , travel lanes and other geometric and
urban design details - for all existing streets, proposed streets that have been adopted as part of an
Official Map, and new potential streets in the City of Beaufort.
B. Official Street Network Plan: Pursuant to the authority of S.C. Code 1976 § 6 -7-1210 et seq. (1976), as
amended, the City has previously adopted several Official Maps. An Official Street Network Plan is
incorporated into this Code in order to represent a composite of these previously-adopted Official Maps.
1. Purpose: This plan represents a composite of all Official Maps, to date, in the City. The map
designates existing or proposed streets or ways within the City that are targeted for creation,
expansion or other improvements. The Official Street Network Plan shall initially consist of a series
of four (4) separate maps, included in Appendix C, which shall be deemed a part of the Beaufort
Code.
2. Modification: The Official Street Network Plan may be modified or supplemented per the
procedure for Amendments and Rezonings (Section 9.16). In addition, the maps will be
automatically updated as additional Official Maps are approved per the appropriate process
required by state law.
C. Street Frontage Requirements: The street sections noted in Appendix C show specific street designs for
the purposes of identifying future improvements by both the city and fronting property owners. These
sections depict the ideal arrangement and design of street elements.
1. Applicability: For any project that is considered part of a Major Subdivision Site Plan , or requires
a Certificate of Appropriateness as a Major project type (Section 9.10.2 A.2.), and/or which affects
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 5 of 41
one whole block face, the fronting property owner shall install all prescribed streetscape
improvements as part of the development project. The installation of street frontage
improvements shall be a condition of final plat approval for major subdivisions, and Certificates of
Occupancy for Site Plans.
a. Exception: If similar elements as prescribed in the street section exist — e.g., on -street
parking, sidewalk, tree plantings — the requirement to install the streetscape element(s)
shall be waived if those items meet the intent of the prescribed street section, even if the
existing items do not meet the exact requirements of that street section. Example Scenarios:
If a street section prescribes a 5 -foot sidewalk, but a 4 -foot sidewalk already exists, the
existing sidewalk will satisfy the sidewalk requirement. However, if the street section requires
a 5-foot planting strip between the curb and the sidewalk, and the 4-foot sidewalk is directly
adjacent to the curb, this would not satisfy the intent of the street section and would need to
be reconstructed per the prescribed standards.
2. Scope of Improvements : Street frontage improvements shall be installed along the entire
frontage of the property, to the centerline of the street, or if a multi-lane street, the affected lane,
at the sole cost of the applicant as directed by the Codes Administrator . The Codes Administrator
may permit modification of street improvement standards where the required street
improvements are not in the opinion of the Codes Administrator , roughly proportionate to the
impact, type, scale and cost of the proposed development action.
a. Street frontage improvements may include the following: curb, gutter, sidewalk, storm
drainage, street lighting, traffic signal equipment, utility installation. extension, or relocation,
landscaping strip, street trees and landscaping, irrigation, str eet widening, pavement overlay or
reconstruction, and channelization.
b. In addition to required frontage improvements, the applicant shall provide ramps from the new
sidewalk or walkway to the existing shoulder, across streets and pavement and channelization
tapering back to the existing pavement and channelization as required to address safety concerns.
D. Dedication of Right-of-Way:
1. Dedication of Right -of-Way. In the case of a street section adopted as part of an Official Map,
where the width of the existing right-of-way is insufficient to install the prescribed street section,
the fronting property owner shall be required to reserve the appropriate amount of right-of-way
(as measured from the centerline of the existing street). The future right-of-way shall conform to
all of the street network requirements of Section 7.2.2. Where a new right -of-way that is not
shown in the street regulating plan, is required as part of a new development, it shall be designed
with appropriate elements based on its proposed location and zoning district. (See Appendix C).
a. In the case of a street section that is not part of an Official Map, where the width of the existing
right-of-way is insufficient to install the prescribed street section, the property owner shall
reserve the appropriate amount of right-of-way to complete the desired street section. If the
owner dedicates and installs the complete right-of-way, the cost of the improvements may be
compensated - see Section 7.2.1 E.
b. Where a future right -of-way is identified on an Official Map, and thus represented on the
Official Street Network Plan — these are indicated as "New Adopted Streets" — new
development shall reserve this area for the new street in the future. If access is needed to the
site in that location, the street shall be constructed in the general location shown.
c. Exceptions and Alternatives:
i. Where available right-of-way — due to existing structures and topographic conditions
limited to wetlands, specimen and landmark trees, — do not functionally permit the
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 6 of 41
full section to be constructed, the Administrator may adjust the required street
section.
E. Compensation: When a project is required to make off -site improvements within the existing right -of-
way, dedicate and/or improve a street with insufficient right-of-way, or install a new street (be it public
or private) per the requirements in Section C. above, compensation may be available. To the extent that
the City has the authority and the ability, the Traffic Impact fee for the project shall be reduced by the
assessed value of the dedicated land and/or construction cost of the right -of-way improvement. This
may be done either as a direct reduction, rebate, or reimbursement of fees . (Ord. No. O- 14-23, 9-26-
2023)
7.2.2 STREET NETWORK REQUIREMENTS
A. Continuation of Adjoining Street System: The proposed street layout shall be coordinated with the
street system of the surrounding area to form an interconnected street pattern, formalized by a platted
public access easement. Adequate street connectivity shall be assessed by the TRC, based on the ability
of the proposed alignments to:
1. Permit multiple routes between origin and destination points;
2. Diffuse traffic; and
3. Shorten walking distances.
B. Block Sizes: Blocks shall be compact so that they are comfortably walkable and appropriate for their
context.
1. In T3-S zones, block sizes are flexible, but the perimeter shall not exceed 2,640 linear feet (½ mile).
An average block perimeter less than 2,000 feet is preferred.
2. In T3-N zones, block sizes are flexible, but the perimeter shall not exceed 1,700 linear feet (⅓ mile).
An average block perimeter less than 1,500 feet is preferred.
3. In T4, T5 and RMX zones , blocks shall be no more than 400 feet on any side. An average block
length of 250— 300 feet is preferred. The block perimeter shall not exceed 1,320 linear feet (¼ -
mile).
4. Exceptions may be made for natural elements such as wetlands, trees, topography, and cultural
resources, to be incorporated into the site design.
C. Street Stubs: New developments shall connect to any existing street stubs from adjacent properties and
stub to all adjacent properties.
1. Exemptions: Street stubs shall not be required where the Planning Commission finds the
conditions listed below would prevent connections:
a. Topographical conditions (pre-development slopes of 18% or greater).
b. Environmental conditions (marshes, floodplains, specimen and landmark trees , etc.).
c. Property shape.
d. Property accessibility (existing platted subdivision with no stubs).
e. Incompatible adjacent land uses.
2. Location: Where multiple connection opportunities exist, street stub connections shall be
prioritized in the site design as follows:
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 7 of 41
a. Adjacent parcels 20 acres or greater in size.
b. Adjacent parcels that abut or are traversed by existing or proposed streets.
c. Where the Street Network Diagram recommends a street connection (indicated as a
proposed street).
3. Design:
a. Stub streets and streets intended for extension during future phases shall be constructed to
extend to the property line for constructability to adjoining property.
b. Stub streets shall not exceed 150 feet in length without a paved turnaround (permanent or
temporary).
c. Disclosure: The Final Subdivision Pla t shall be recorded depicting that future connection is
required at any s tub streets and streets intended for extension during future phases. A
clearly visible street sign shall be erected at the end of the stub street stating that the street
is planned to connect to a future street.
D. Cul-de-sacs and Dead-end Streets: Dead-end streets and cul-de-sacs are prohibited, except for only the
T-3 and LI zoning districts, where cul -de-sacs or other turn -arounds may be approved by the Planning
Commission. Compliance with the following standards must be met in all circumstances:
1. Permanent dead-end streets shall be no longer than 300 feet and shall be provided with a turn, -
around such as a cul-de-sac or close.
2. Temporary dead-end streets shall be provided with a temporary turnaround area which shall be
designed considering traffic usage, maintenance, and removal.
3. Alternative design solutions, such as a close (first preference), or a loop road cul -de-sac (second
preference) are preferable to a typical cul-de-sac.
4. Cul-de-sacs shall have a minimum right -of-way radius of 50 feet and minimum paved radius of 40
feet. When ample radii exist, cul-de-sacs shall contain a central planted median.
5. Whenever cul-de-sac roads are created, at least one pedestrian access easement shall be provided,
to the extent practicable, between each cul -de-sac head or road turnaround and the sidewalk
system of the closest adjacent road or pedestrian pathway. The access easement shall be direct
with a minimum width of 12 feet.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 8 of 41
E. Gated Streets: New gated streets are prohibited.
1. Exceptions: They may be permitted, at the discretion of the Planning Commission, in T3 -S zoning
districts where connection to the existing street grid is not practicable due to topography or
existing surrounding conditions.
2. They may be permitted by the Planning Commission when the access proposed to be gated is an
alley or rear lane and is not the primary building frontage.
F. Street Naming and Renaming: Proposed Street names and number systems will be reviewed by the
administrator and the Beaufort County Emergency Management Department. No duplicate/similar
names are allowed, as determined by these agencies.
G. Reserved Strips Prohibited: Reserved strips at the terminus of a new street shall be prohibited.
7.2.3 LOT ACCESS STANDARDS
A. Applicability: Any development that requires an access point (rear alley/lane or driveway) for purposes
of ingress and/or egress shall be subject to the provisions of this section. All new accesses must be
approved by the appropriate permitting authority. Access points may not be installed on undeveloped
property less than 2 acres.
B. Maximum Number: For single-family and two - and three-family dwellings, only one driveway shall be
permitted per lot. In T3 -S, circular driveways may be permitted on lots greater than 100 feet in width,
where no sidewalk exists. Driveways may only be installed when rear a ccess is not possible or required.
For double frontage lots, one curb cut per street may be permitted. For all other building types, the
maximum number of driveways allowed for any property is outlined in the table below.
FRONTAGE
WIDTH
MAXIMUM PERMITTED DRIVEWAYS (CURB CUTS)
PER STREET FRONTAGE
up to 150 feet 1
150 feet or more 2 - Additional driveways (in excess of 2) shall be permitted only after the applicant
successfully demonstrates the necessity for such additional driveways, as determined by
the appropriate Design Review Body. Along arterial roads and thoroughfares, such
additional driveways shall be "right-in, right-out" driveways only.
C. Location and Spacing:
1. Street Intersection: No curb or other access point shall be located closer than:
a. 20 feet from the intersecting point of the 2 street right -of-way property lines involved (or
such lines extended in case of a rounded corner);
b. 25 feet from the intersection of the 2 curb lines involved (or such lines extended in case of a
rounded corner), whichever is the least restrictive.
2. Spacing: All access points shall have a minimum separation from certain features as follows:
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 9 of 41
FEATURE MINIMUM SEPARATION1
Adjacent Property Line (does not apply to shared or
joint-use driveways)
0 ft
Another Curb Cut (driveway or street intersection) on
all roads except Major Thoroughfares
25 ft
Major Thoroughfares — defined as streets with the
Street Section designation of Major Thoroughfare, or
the Robert Smalls Parkway, Sea Island Parkway/Lady's
Island Drive, or Boundary Street Specific Street Section
— Another Curb Cut (driveway or street intersection)
Depends on Posted Speed Limit
< 35 mph 100 ft
35 mph 200 ft
40 mph 250 ft
45 mph2 300 ft
50 mph2 400 ft
55+ mph2 500 ft
1 Minimum separation is measured from centerline
2 On Robert Smalls Parkway (Hwy 170) west of Parris Island Gateway, a minimum of 500 ft. separation distance
is required
3. Corner Lots: Access points on corner lots shall be from the side (or secondary) street, unless a
shared curb cut on the main thoroughfare is existing or proposed.
4. Access to Lots from Major Thoroughfares: Driveways serving individual residential lots shall not
have direct access onto streets identified as Major Thoroughfares — as identified on the second
row of the chart in Section 7.2.3 C.2. — unless no alternative means of access, such as alleys or
parallel access roads, exists, and it is unreasonable or impractical to require an alternative means
of access.
5. Shared Access: See Section 5.7.7 C.
6. Rear Access Required /No Front Access: For lots developed in the transect zones of T -3N, T-4, T-5
UC, all new access points shall be from a rear alley and/or road, except for lots within the historic
district. Exemptions to allow front loaded access points where connection to the existing street
grid is not practicable due to topography or existing surrounding conditions shall be at discretion
of the Planning Commission with approval of major subdivisions, and the Codes Administrator for
individual lots.
D. Size:
1. Alleys: Alley pavement width may be a maximum of 24 feet wide for two -way traffic and 16 feet
wide for one-way traffic. For more design standards, see Appendix C.
2. Driveways:
a. Driveways for single-family and 2- and 3-family uses may not exceed 12 feet wide, except in
T3-S district, where they may be a maximum of 20 feet wide.
b. Tandem Parking: Tandem parking is allowed in all zones for all residential uses if:
i. Both tandem parking spaces satisfy the parking requirement of one residential
unit; and
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 10 of 41
ii. Neither of the tandem parking spaces shall be for required accessible parking
spaces.
c. Driveways to other uses and parking areas shall not exceed 24 feet in width for 2-way drives
or 12 feet in width for one -way drives, except those with turn lanes required by the city or
SCDOT.
E. Access to Lots from Alleys/Rear Lanes:
1. Specific to T3 -N, T4, and T5 districts: Alleys/rear lanes shall be provided along the rear property
lines of lots as follows:
a. In new subdivisions greater than 1 acre, alleys shall be provided for newly created lots that
meet any of the following criteria:
i. The lots are part of a block face with an average lot width of 60 feet or less at the
building setback line (excluding lots on cul-de-sacs).
ii. The lots are arranged around a Common Open Space.
iii. The lots front a collector or arterial road, regardless of the average lot width.
iv. The lots are intended for multi-family dwellings and/or mixed-use buildings.
b. In infill situations, the same standards apply as specified above, but only for developments
that include 4 or more contiguous lots, where one lot is a corner lot. In the Historic District,
the standards apply only to the Beaufort Conservation District; the requirement may be
waived at the discretion of the Historic Review Board.
F. Specific to Commercial Developments and Subdivisions:
1. Out-parcels: Out-parcels for shopping, office, or industrial centers shall be limited to internal
access to the center, unless otherwise approved as part of a master development plan. All
driveways shall be paved from the road to the property line.
2. Abandoned Driveways: Abandoned driveways (i.e., curb cuts that are no longer used for vehicular
access and are physically blocked by structures) shall be closed, and the area shall be restored to
the typical cross section of the right-of-way.
7.2.4 STREET DESIGN STANDARDS
A. Street Section Design: The elements and widths of all proposed streets shall be in conformity with the
appropriate street section designated in the Street Regulating Plan (Section 7.2.1 and Appendix C).
B. Traffic Control and Signs: The type and location of traffic control devices used on City streets must be
approved by City Staff, and traffic control on private Streets shall be included and approved as part of
the major subdivision or site plan. Traffic signals should be used where warranted, but alternate traffic
control such as roundabouts should be considered first. When it can be shown that a particular zoning
action, master plan, or development plan impacts the street system to a point that a traffic signal is
warranted according to Manual on Uniform Traffic Control Devices (MUTCD) and approved by City Staff,
the developer shall be responsible for all or a portion of the signal installation.
C. Sidewalks/Multi-use Paths: Where required per the Street Section in Appendix C, all sidewalks or multi-
use paths must be constructed concurrently with the street, or, if the street is already constructed, prior
to acceptance of any improvements. Exceptions to, the requirement to install a sidewalk may be granted
by the Planning Commission if:
1. Alternative pedestrian paths/bikeways have been or will be provided outside of the normal right -
of-way.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 11 of 41
2. There are unusual topographic, vegetative, or other natural conditions to the extent that strict
adherence to said requirements would be unreasonable and not consistent with the purposes and
goals of this Code.
D. Utility Easements: Utility easements which require a width of 8 feet or larger shall be located in rear
alleys or along the side or rear lot lines. Special permission to install utility easements in other locations
may be requested by the utility companies and is subject to approval by the appropriate Design Review
Body.
E. Special Consideration to Protected Resources and other Natural Features: Street layout and design shall
give additional consideration to preserving protected resources and enabling natural areas to be
protected or minimally disturbed. Where streets are built in areas that have protected resources or
natural features, all utili ties shall be placed within the street right -of-way and under the street in order
to avoid additional destruction of the natural features.
7.2.5 STREET TREE PLANTING REQUIREMENTS
A. Planting Areas: Planting strips and tree wells shall be established in accordance with the width and
plantings designated in the appropriate Street Section of the Street Regulating Plan (7.2.1 and Appendix
C).
B. Location and Number: Street trees shall be planted in the location and per the spacing specified for the
corresponding street classification in Appendix C. However, in specific cases, where due to the location
of utilities or other site constraints exist, the Planning Commission may allow street trees to be planted
on private property adjacent to the right-of-way.
C. Tree Species: Overstory and understory trees as prescribed in this section reference Appendix A.2
(Recommended Trees and Shrubs).
D. Minimum Tree Size: At the time of planting, young trees should be 2.5 inch caliper, with the lower side
of the crown a minimum of 6 feet above grade to avoid hazards to pedestrians.
7.3: STREET ENGINEERING STANDARDS
7.3.1 STREET DESIGN, CERTIFICATION, AND CONSTRUCTION SPECIFICATIONS
A. Design Drawings and Certification: Professional engineers, registered in the state, shall prepare plans,
profiles, cross sections, and specifications for all subdivision roads and streets. The engineers shall certify
roads/streets are built to comply with the approved plans and specificati ons. Cross sections shall be
developed every 100 feet at intersections and break points in grade. Cross sections shall show the
complete rights -of-way including travel lanes, shoulders, ditches, curb and gutter, and sidewalks and
utility locations, as applicable.
B. Construction Specifications for Paved Streets: Street construction specifications for paved streets shall
be in compliance with the South Carolina Department of Transportation Standards.
7.3.2 TRAFFIC IMPACT ANALYSIS
A. Applicability: A "traffic impact analysis" (TIA) shall be required for any development that is shown — in
the most recent Institute of Transportation Engineers (ITE) Trip Generation Manual or any alternative ,
approved at the discretion of the Planning Commission or the TRC, or by the engineering department
— to generate more than 50 trips during the peak hour on the adjacent street(s).
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 12 of 41
1. A second phase, second subdivision, or addition that generates traffic beyond this threshold when
taken as a whole shall also require a TIA, even though that development does not qualify on its
own.
2. A use shall not be changed without conducting a new TIA if the new use would generate traffic
beyond the 50 trips during peak hour threshold above. The Planning Commission may waive this
requirement.
3. Exception: Development — except for Educational Facilities with greater than 100 students — on
lots included in the Boundary Street Master Plan, adopted on August 28, 2006, and lots in the area
bounded by Calhoun Street, Carteret Street, Bay Street, and Ribaut Road, and lots zoned Limited
Industrial (LI), shall not be subject to the requirements of this section.
B. Traffic Access Management Analysis: As part of the TIA process, the proposed development shall have
an "access analysis" undertaken by the administrator to ensure that sufficient access to all proposed
developments and subdivisions is achieved.
1. The standards in the South Carolina Department of Transportation's "Access and Roadside
Management Standards Manual" (a.k.a. ARMS Manual) shall serve as a guide for this analysis,
which shall include identification of the following:
a. Access improvements that the applicant must install at his or her expense, such as
deceleration lanes;
b. The location of any curb cuts based on, but not limited to, sight distances, existing roadway
infrastructure, opposing driveways locations, and shared access;
c. Requirements for adequate driveway design, including, but not limited to, turning radius and
stacking distance.
2. The access requirements approved by the Planning Commission or the TRC shall be incorporated
on development or subdivision plans prior to their approval.
3. If an applicant is required to provide site -related traffic improvements, the cost of implementing
such improvements shall be borne by the applicant, and no such costs shall be eligible for a credit
or offset from any transportation impact fees unless s pecifically permitted by the Development
Fee Procedures - Beaufort County Code of Ordinances, Chapter 82, Article VII or most recent
version.
C. Traffic Impact Analysis Plan Preparation:
1. The TIA shall be conducted by an engineer registered in South Carolina who is experienced in the
conduct of traffic analysis.
2. Prior to beginning the TIA, the applicant shall supply the city with the following:
a. A written narrative describing the proposed land use(s), size, and projected opening date of
the project and all subsequent phases.
b. A site location map showing surrounding development within a one-half mile of the property
under development consideration.
c. A proposed site plan or preliminary subdivision plat illustrating access to public or private
roads and connectivity to other contiguous developments.
3. Prior to beginning the TIA, the applicant shall receive, in writing, the parameters to be followed in
the study, including the directional split of driveway traffic, trip distribution, background traffic
growth rate, previously approved but not completed projects, and the intersections to be analyzed,
along with any associated turning movement counts that are available or discussed and approved
by the TRC.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 13 of 41
4. To review the TIA, the Planning Commission and TRC will require current trip generation
information, available information on land use, travel patterns, and traffic conditions, and shall
consult with the SCDOT.
D. Plan Contents:
Background information Requirement
List of all nonexistent transportation improvements
assumed in the analysis
Required
Map of site location, description of the parcel,
general terrain features, and location within the
jurisdiction and region.
Required
Description of geographic scope/ limits of study
area.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed.
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Plan at an engineering scale of the existing and
proposed site uses.
Required
Description and map or diagram of nearby uses,
including parcel zoning.
Required
Description and map or diagram of existing
roadways.
Required
Analysis of Existing Conditions
Collected daily and peak hour of the generator
traffic volumes, tabulated and presented on
diagrams with counts provided in an appendix.
Required
Analyses for intersections and roadways identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for
each lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments, tabulated and
presented on diagrams, if facilities or routes exist.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed –
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 14 of 41
Incorporation of all Traffic Impact Analysis studies
and Trip Generation from approved developments
or vested unbuilt developments within mile radius
at time of proposal.
Required (submitted for any jurisdiction, including
the Town of Port Royal, and County of Beaufort)
Speed Study If requested by City
Crash history near site If requested by City
Sight distance If requested by City
Analysis of Future Conditions without Development
Description of and justification for the method and
assumptions used to forecast future traffic volumes.
Required
Analyses for intersections and roadways as identified
by SCDOT. Delay and Level of Service (LOS) are
tabulated and LOS is presented on diagrams for each
lane group.
Required
When the type of development proposed would
indicate significant potential for walking, bike or
transit trips either on - or off - site, analyses of
pedestrian and bicycle facilities, and bus route or
routes and segment or segments tabulated and
presented on diagrams, if facilities or routes exist or
are planned.
Within half mile/2,640 feet of site and any roadway
on which 50 or more of the new peak hour vehicle
trips generated by the proposal are distributed.
At the discretion of the TRC or Planning Commission,
a larger study area may be required.
Trip Generation
Site trip generation, with tabulated data, broken out
by analysis year for multi- phase developments, and
including justification for deviations from ITE rates, if
appropriate.
Required
Description and justification of internal capture
reductions for mixed use developments and pass-by
trip reductions, if appropriate, including table of
calculations used.
Required
1. Phased Developments: All phases of a development are subject to review, and all traffic plans for
the entire development shall be integrated with the overall traffic analysis. A TIA for a specific
phase of development shall be applicable to the phase of development under imme diate review.
However, each phase of development shall expand and provide detailed analysis at the
development plan stage beyond the estimates provided for at the concept plan or master plan
stage.
2. Infrastructure Analysis: The adequacy of the roads that the development will be accessed from
shall be assessed in the TIA. Recommendations for improvements shall be made. The relative share
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 15 of 41
of the capacity created shall be broken down as follows: development share, other developments'
share, any existing overcapacity, and capacity available for future growth.
3. Required Elements of the TIA:
a. A site plan or subdivision plat identifying accesses to and from existing or proposed streets
and intersections, along with all opposing intersections across adjacent streets.
b. Description of the proposed development, including the type and intensity of proposed land
use(s) including, but not limited to: the number of residential units by type, the number of
existing and proposed lots, the type of proposed nonresidential devel opment and the
amount of such development measured by gross floor area or other appropriate unit of
measurement, the general size and type of accessory development or facilities, and, for
nonresidential development, adequate information to identify the appropriate land use
category for trip generation.
c. Projected vehicular trips to and from the completed development during a.m. and p.m. peak
hour — trip rates shall be taken from ITE Manual or alternatively, an applicant may elect to
perform, at his own expense, a "trip generation study" which may be submitted as part of
the traffic impact analysis plan. Such trip generation study shall be subject to the review and
verification of the TRC and engineer. For proposed uses not specifically listed in the ITE
Manual, and for which a trip generation study has not been performed, the designated
engineer(s) shall determine the most appropriate trip generation rate. The TRC shall make
the determination of the appropriate trip generation rate, from whatever the source. The
percentage of pass-by trips, if used in the plan, shall be included, as well as the source of this
information.
d. A written narrative setting forth the assumptions upon which any projection was made in
developing the traffic impact analysis plan shall be included in the analysis. If the
assumptions are derived from the ITE Manual, the materials shall be referenced and properly
cited. If the assumptions are not from the ITE Manual, appropriate excerpts from other
reliable transportation planning resources shall be included in the study, and reasons
underlying the assumptions shall be stated in the narrative.
e. The TIA shall review access to the site. The adequacy of the entrance design shall be
evaluated, and recommendations made on acceleration and deceleration lanes, left -turn
lanes, or signalizations shall be part of the TIA. Educational facilities shall include pick-up and
drop-off plans and analysis of the impact on the surrounding streets and interse ctions.
f. The TIA shall review the number and types of curb cuts that are permitted. In particular, the
TIA shall assess the connection of the property to adjoining properties. Where the use, scale
of development, or size of adjoining properties is such that trips would be anticipated
between the proposed use and the other properties, the TIA shall make recommendation on
interconnections. The TIA shall recommend interconnections to provide a smooth flow of
traffic between uses along arterials and collector roads t o ensure that as much traffic as
possible uses secondary roads, rather than major roads, for short trips.
g. The TIA shall be based on intersection analysis procedures for signalized intersections as
identified in the most current edition transportation research board's highway capacity
manual, and/or the last update that analyses and emulates these procedures by means of
computer software, if available. The results of any required analysis/computer analysis shall,
at a minimum, indicate compliance or variance from the Traffic Goals (Section 7.3.3 M).
h. The intersections that must be analyzed in the study are identified as:
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 16 of 41
i. Any intersection that serves as a development's point of access. This will include
intersections of public and/or private roads with major arterials, and driveways
offering direct access.
ii. The first major intersection as identified by the city engineer on both side of the
development's point of access.
iii. Other intersections on major arterials if development generates more than 50
a.m. or p.m. peak hour trips to that intersection, or if the intersection's level of
service or demand is significantly impacted by site related traffic.
iv. Unsignalized intersections and access drives — these shall be considered if
development impacts are anticipated. The plan must include the results of an
analysis of the operating conditions of critical intersections and/or all
intersections identified in the concept plan. The analysis shall reflect the
projected condition of these intersections and movements, based on the
scheduled opening date of the development. Other phases of the development,
if they can be reasonably determined, shall be considered as well.
E. Mitigation Plan Required: If the initial analysis indicates that the city's adopted Traffic Service Level
Goals (Section 7.3.2 M.) will not be met, a mitigation plan must be prepared, based on additional analysis.
The mitigation plan must show how the city's Traffic Service Level Goals are addressed as mitigated.
Applicants will be responsible for mitigating the traffic impacts at any intersection affected by a proposed
development.
1. If a traffic signal is recommended, the TIA shall provide information that:
a. Clearly indicates the need for a traffic signal.
b. Assesses the ability of other existing, planned, or proposed public roads to accommodate
the new traffic at a location other than the main highway in the vicinity of the proposed
development.
c. Describes in detail how a specific development will affect the study area transportation
system.
d. Provides documentation of appropriate South Carolina Manual of Uniform Traffic Control
Devices signal warrant satisfaction.
e. Gives design geometry of the private road that is consistent with that of public road
intersections, including curbs, appropriate lane widths, pavement markings, and vertical
alignment. Other roadway factors to be considered include, but are not limited to, speed,
type of highway, grades, sight distance, existing level of service, conflicting accesses, and the
effect of future traffic signal systems.
f. Provides an approach -throat length for the road to ensure the movement of vehicles
entering the site will not be impeded by conditions within the development and ensure that
all signal-spacing requirements are adequately met.
2. The desirable spacing of signalized intersections on principal arterials is the SCDOT, county, or city
standards. The TRC may recommend to SCDOT the installation of a traffic signal at locations where,
using SCDOT standards, spacing is inappropriate due to topography, existing or proposed road
layout, documented accident history, unique physical constraints, existing or proposed land use
patterns, or requirements to achieve specific objectives for highway segment designations, as
shown in any locally ado pted land use or transportation plan, approved city or county
transportation plan, or approved transportation policy.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 17 of 41
3. Signal spacing concerns may be ameliorated in the following ways:
a. A proposed private road that may otherwise be considered for the installation of a traffic
signal may be replaced by an on- site route or a frontage road that directs traffic to or from
a nearby public road.
b. A private road that is being considered for traffic signal installation may be required to
connect to the existing or planned local road system to allow uses of surrounding properties.
c. An existing or proposed intersection may be relocated.
d. A shared private road may be required to serve the needs of the multiple properties.
4. A traffic signal progression analysis is required if the proposed location is closer than the SCDOT
standards, given the presence of existing signals or the possible existence of identified future
signals proposed as part of a highway signal system. A traffic signal progression analysis for all new,
revised, or planned traffic signal systems on state highways shall be performed using methods,
models, computer software, data sources, roadway segment length, and assumptions approved by
the TRC. The roadway segment, analyzed to the extent possible, shall include all traffic signals in
the existing or future traffic signal system. The progression analysis shall:
a. Demonstrate acceptable existing and future traffic signal systems operation that may include
the morning peak, evening peak, midday period, and other appropriate time period during
any day of the week, adjusted for peak season, for cycle lengths and travel speeds approved
by the TRC.
b. Provide for a progressed traffic band speed no more than 5 mph (8 km/h) below the existing
posted speed for both directions of travel during the off-peak periods, nor more than 10 mph
(16 km/h) below the existing posted speed during peak periods. Approv al by the TRC is
required where speeds deviate more than the above.
c. Demonstrate that sufficient vehicle storage is available at all locations within the traffic signal
system without encroaching on the functional boundaries of adjacent lanes and signalized
intersections. The functional boundary of an intersection shall be determined in discussion
with the TRC, based on existing or projected conditions.
d. Provide a common cycle length with adequate pedestrian crossing times at all signalized
intersections.
e. Provide a progression bandwidth as large as that required, or as presently exists, for through
traffic on the federal or state highway at the most critical intersection within the roadway
segment. The most critical intersection is the intersection carry ing the highest through
volume per lane.
5. The traffic signal progression analysis shall be supplemented by a traffic engineering report that
also considers highway capacity and safety of the roadway segment under consideration. Traffic
volumes, intersection geometry, and lane balance, considered at all locations, shall be appropriate
for the present and identified future conditions, which are usually considered to include the year
of completion, and 5 years into the future.
F. Summary: A clear and concise summary of recommended improvements that can serve as an executive
summary is required.
G. TIA Review: The TRC shall review all TIAs as part of the applicable Design Review phase — . Final TIAs
shall be approved prior to the applicant submitting a Project Permit application (Section 9.5).
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 18 of 41
H. Application: A TIA shall be submitted to the TRC. Coordination with other entities in the county
government or South Carolina Department of Transportation (SCDOT) shall be the responsibility of the
city.
I. Completeness: The Planning Commission and/or TRC shall determine whether a TIA is complete.
Thorough and complete TIAs are the responsibility of the applicant. Failure by the applicant to provide a
complete TIA may result in review delays for their plat or plan.
J. Action on TIA: The TRC must first approve the TIA in regard to completeness and accuracy. Following
review of the required impact analysis plan, TRC shall recommend to the Planning Commission action as
follows:
1. Approval of the TIA as submitted;
2. Approval of the TIA with conditions or modifications as part of the development review and
approval process. An acceptable TIA with traffic mitigation measures may include the reduction of
the density or intensity of the proposed development, phasing of the proposed development to
coincide with state and/or county-programmed transportation improvements, applicant-provided
transportation improvements, fees in lieu of construction, or any other reasonable measures to
ensure that the adopted traffic service- level goals are met. If mitigation is required, it shall be
required as a condition of any approval from the city.
K. Timing of Implementation: If a traffic mitigation program is part of an approved TIA, the developer may
be required to place a performance bond on all traffic mitigation improvements required as a result of
his project. This requirement may arise if the timing of the improvements needs to be synchronized with
other scheduled improvements anticipated for the area.
L. Responsibility for Costs of Improvements: The costs of implementation of an approved mitigation
program shall be the responsibility of the applicant. No certificates of zoning compliance or building
permits shall be issued unless provisions of the TIA are met.
M. Traffic Service Level Goals: The average stop time delay in seconds per vehicle for each intersection
determined to be critical to the TIA for the proposed development shall be compared to the city's traffic
service level goal of "D" for the average delay for all vehicles at any sign alized intersection during the
a.m. and p.m. peak hours.
7.4: COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE
7.4.1 PURPOSE AND INTENT
A. Intent: Community Green Space and Community Open Space is intended for the use and enjoyment of
a development's residents, employees, or users. These spaces serve to preserve natural areas, ensure
access to open areas and recreation, reduce the heat island effect, enhance stormwater quality, and
provide community health benefits. Community Green Space and Community Open Spaces are not, by
definition, required to be deeded or to be granted via easement to any public entity or municipality. See
Section 7.4.5 for ownership information.
B. Purpose: The purpose of this section is to provide a set of Community Green Space and Community Open
Space types and their associated standards to use within all districts. Community Green Space and
Community Open Space types in this section are distinct from those areas that are environmentally
sensitive and must be otherwise protected as regulated through Article 8 (Environmental Protection) .
C. Applicability: See Section 7.1.2.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 19 of 41
D. Community Green Space Definition: an area of grass, trees, parks, trails or multi-use pathways, or other
vegetation set apart for recreational or aesthetic purposes with in a development. It can be privately or
publicly owned.
E. Community Open Space Definition : Open space is land or water that is undeveloped and not used for
residential, commercial, industrial, or institutional purposes. It can be privately or publicly owned, and
can include areas like forests, farms, parks, and coastal lands.
7.4.2 COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE REQUIREMENT
A. Minimum Requirements: Development in all districts shall preserve the minimum amounts of
Community Green Space and Open Space as identified below:
(see following page)
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 20 of 41
B. Areas to be Included in Community Green Space and Community Open Space Calculations: The features and areas identified in Section 7.4.3 shall
be credited towards the open space requirements for the purposes of complying with this article.
C. Areas not to be Included in Community Green Space and Community Open Space Calculations: The following areas shall not be counted toward
open space requirements:
1. Private yards which are not subject to an open space or conservation easement.
2. Public road rights-of-way or private street easements, including sidewalks located within those rights -of-way or easements.
3. Open parking areas and driveways for dwellings.
4. Land covered by structures not designated for active recreational uses.
5. Designated outdoor storage areas.
OPEN/CIVIC SPACE REQUIREMENT
SIZE T1 T3-S T3-N T4-HN T4-N T5-DC T5-UC RMX IC LI MHP 1
Less than 3
acres See footnote (3)
3 acres—
10 acres 50% 20% 15% exempt 10% exempt 10% 10% 15% exempt
10 acres—15
acres 50% 20% 15% exempt 10% exempt 10% 15% 20% exempt 10%
15 acres—40
acres 50% 20% 15% n/a 15% exempt 15% 20% 20% exempt 10%
Greater
than
40 acres
50% 25% 20% n/a 20% exempt 20% 25% 25% exempt 10%
1 Each Manufactured Home Park shall have a minimum total area of 2,500 square feet set aside for common recreational open space , or at least 100
square feet of space for each mobile home lot, whichever is greater.
2 Specific to TND Overlay Projects: The open space requirement may be calculated comprehensively or by specific Transect zones. The requirements of
2.8.3.G.2.c must be met in addition to the requirements of this table.
3 For properties less than 3 acres, community green space and community open space shall be at the discretion of the approving authority (i.e.) Codes
Administrator or Planning Commission.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 21 of 41
7.4.3 COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACE TYPES
The majority of Community Green Space and Community Open Space shall conform to one of the eight (8) types in the table below. If 75% or more of the types
listed below are utilized for required open space, a 20% increase in number of dwelling units is permitted.
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Regional
Park/Natural
Preserve
A natural preserve that is
available for unstructured
recreation. It may contain
small civic buildings and areas
of structured activity, but is
primarily left natural. These
areas may include forests as
well as wetlands and regional
retention areas if they are
treated as amenities (e.g. Port
Royal's Cypress Wetlands).
T1 Regional
Min: 200 acres*
Max: None
*Natural
preserves with no
structured
activity have no
minimum size.
Frontage:
Independent
Disposition:
Natural, formal
or informal
Passive and active
recreation, drinking
fountains, Community
facility < 7,500 gross
square feet, paths and
trails
Sport Complex
An open space that
consolidates heavily
programmed athletic fields
and associated facilities.
T1, IC, RMX Regional
Min: 25 acres
Max: None
Frontage:
Independent
Disposition:
Formal or
informal
Passive and active
recreation, drinking
fountains, community
facility < 7,500 gross
square feet, paths and
trails
Community Park
An open space that is available
for unstructured recreation
and a limited amount of
structured recreation. It may
contain a limited amount of
athletic fields.
T3, T4, T5,
RMX, IC
Multiple
Neighborhoods
Min: 8 acres
Max: None
Frontage:
Independent
Disposition:
Informal
Passive and active
recreation, drinking
fountains, community
facility < 5,000 gross
square feet, paths and
trails
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 22 of 41
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Greenway
A linear open space that may
follow natural corridors, a
greenway provides
unstructured and limited
amounts of structured
recreation.
T1, T3, T4,
T5, RMX, IC
Multiple
Neighborhoods
Min: 8 acres or 1
mile
Max: None
Frontage:
Independent or
building
Disposition:
Natural or
informal
Passive and active
recreation, drinking
fountains, community
facility < 5,000 gross
square feet, paths and
trails
Square/Green
An open space that is available
for civic purposes,
unstructured, and limited
amounts of structured
recreation. It can be located
along waterfronts.
T3, T4, T5,
RMX, IC
Neighborhood
Min: 0.5 acres
Max: 5 acres
Frontage:
Building
Disposition:
Formal
Passive and active
(unstructured or
structured) recreation,
accessory structure,
drinking fountains,
community facility <
5,000 gross square
feet, paths and trails
Plaza
A formal open space available
for civic purposes and
commercial activities, a plaza
is typically hardscaped and can
be located along waterfronts.
T4, T5, RMX,
IC
Neighborhood
Min: 0.5 acres
Max: 2.5 acres
Frontage:
Building
Disposition:
Formal
Passive recreation,
accessory structure,
drinking fountains,
paths and trails
Pocket
Park/Pocket
Plaza
An open space that is available
for informal activities in close
proximity to neighborhood
residences. Pocket plazas are
usually paved.
T3, T4, T5, IC,
RMX
Neighborhood
Min: 4,000 square
feet
Max: 0.5 acre
Frontage:
Building
Disposition:
Formal or
informal
Passive recreation,
accessory structure,
drinking fountains,
paths and trails
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 23 of 41
CIVIC/
OPEN
SPACE TYPE
DIAGRAM DESCRIPTION PERMITTED
DISTRICTS
SERVICE AREA/
SIZE CHARACTER TYPICAL FACILITIES
Playground
An open space designed and
equipped for the recreation of
children. A playground may be
fenced and may include an
open shelter. Playgrounds may
be included within other civic
spaces.
T3, T4, T5, IC,
RMX
Neighborhood
Min: None
Max: None
Frontage:
Independent or
building
Disposition:
Formal or
informal
Accessory structure,
drinking fountains,
paths and trails
Notes:
1. The illustration and description of each civic space type is illustrative in nature and not regulatory.
2. The Permitted Districts may be modified per a plan if the project is utilizing the Traditional Neighborhood Development Float ing Overlay District (Section
2.8.3).
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 24 of 41
The following provisions apply to the eight ( 8) Community Green Space and Community Open Space Types listed in
the table:
A. Playgrounds and Community Gardens: These may be incorporated into any of the other Community
Green Space and Community Open Space types - except Natural Preserve - or may stand alone.
B. Waterfront: When Community Green Space and Community Open Space is required, per Section 7.4.2,
developments that contain waterfront access should include some type of common access to at least
25% of the waterfront. This counts towards the Community Green Space and Community Open Space
requirement. When open space is required, for every 10% of the waterfront that is allocated for public
access, a 5% increase in number of dwelling units shall be permitted, up to a maximum of a 20% increase.
C. Illustrative Standards: The columns titled "Diagram," "Description," and "Typical Facilities" of the table
of Community Green Space and Community Open Space Types are illustrative only.
D. Regulatory Standards: The following elements shall be regulatory:
1. Service Area: Describes how the space relates to the city as a whole and the area that will be served
by the Community Green Space and Community Open Space.
2. Size: The permitted size for each Community Green Space and Community Open Space.
3. Frontage: The relationship along property lines of a Community Green Space and Community Open
Space to adjacent buildings or lots.
a. Building: Community Green Space and Community Open Spaces that are listed as having a
"building" frontage shall have the fronts of buildings, either attached to the park or across a
street, facing onto the space for a minimum of 75% of the perimeter.
b. Independent: Community Green Space and Community Open Spaces that are listed as
having an "independent" frontage shall have the fronts of buildings, either attached to the
park or across a street, facing onto the space to the maximum extent possible, but may have
the side or rear of a building or lot fro nt onto the space. The side or rear of a building or lot
fronting onto the Community Green Space and Community Open Space shall be designed
with a secondary frontage and entrance along the space.
4. Disposition: The character of the design of the Community Green Space and Community Open
Space.
a. Natural: Civic spaces with natural character are designed in a natural manner with no formal
arrangement of elements.
b. Formal: Civic spaces with a formal character have a more rigid layout that follows geometric
forms and have trees and other elements arranged in formal patterns.
c. Informal: Civic spaces with an informal character have a mix of formal and natural
characteristics.
5. Food Production: Community Gardens and other Community Green Space and Community Open
Spaces may be used to grow food. See Section 8.4.3 for specifications and requirements.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 25 of 41
7.4.4 DESIGN OF COMMUNITY GREEN SPACE AND COMMUNITY OPEN SPACES
A. Design Standards for Community Green Space and Community Open Space: Land used as Community
Green Space and Open Space shall meet the following design standards:
1. Location:
a. Where relevant and appropriate, the land shall be located so as to be readily accessible and
usable by residents and users of the development. To the maximum extent practicable, a
portion of the open space shall provide focal points for the development.
b. Common space set aside for children's play areas and other recreational activities shall be
clearly visible from the dwelling units on the site.
c. The land shall, to the maximum extent practicable, be located to adjoin, extend, and enlarge
any open areas, trails, parks, or other open space resources that exist or are planned within
or adjacent to the development.
2. Provision in Multi-Phase Developments: In multi-phase developments, open space Manuals may
be calculated either by phases, or by collectively looking at the development as a whole.
B. Accessory Structure Standards: All accessory structures within parks and open spaces — including, but
not limited to, restrooms, open-air pavilions, gazebos, picnic shelters, and outdoor theaters — shall not
be subject to the physical requirements of the building form or siting standar ds in Article 2 (Map and
Districts). They shall be designed to be consistent with the character of the district in which they are
located. Such consistency may require accessory structures to maintain building setbacks, fro ntage,
massing, disposition, and character similar to adjacent development as determined by the administrator.
7.4.5 OWNERSHIP AND MAINTENANCE OF COMMUNITY GREEN SPACE AND COMMUNITY
OPEN SPACE
A. Open space areas or other community facilities shall be preserved and maintained in accordance with
the approved:
1. Development Design, in accordance with Section 9.8;
2. Special Exception, in accordance with Section 9.13; or
3. Subdivision, in accordance with Section 9.9, whichever is appropriate.
B. Provision must be made by the property owner to ensure preservation and long term maintenance and
management of Community Green Space and Community Open Spaces through one of the following
mechanisms:
1. Conveyance of the land to a property owners' or homeowners' association that holds the land in
common ownership and will be responsible for managing and maintaining it for its intended
purposes.
2. Conveyance of the land to a third- party beneficiary, such as a nonprofit environmental or civic
organization, that is organized for, capable of, and willing to accept responsibility for managing and
maintaining the land for its intended purpose.
3. Dedication of the land to the city or other appropriate public agency that is organized for, capable
of, and willing to accept responsibility for managing and maintaining the land for its intended
purposes.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 26 of 41
C. All methods utilizing private ownership shall require deed restrictions, covenants, or other legal
instruments that ensure continued use of the land and facilities for their intended uses, and provide for
the continued and effective management, operation, and maintenance of the land and facilities.
D. Failure to maintain Community Green Space and Community Open Space areas or other community
facilities shall be a violation of this Code subject to the remedies and penalties in Article 12 (Violations
and Enforcement).
E. If the owner of a Community Green Space and /or Community Open Space fails to maintain it in
reasonable condition, and in accordance with approved plans, and fails to correct deficiencies cited by
the city, the city shall have the authority to correct the deficiencies per the City's Code of Ordinances at
the owners expense.).
7.5: SUBDIVISION AND SITE PLAN STANDARDS
7.5.1 GENERAL PROVISIONS
The provisions of this Section shall apply to any and all subdivision of land, or site plan within the municipal
boundaries of the City, unless expressly and specifically exempted or provided otherwise in this Code. No
development shall be undertaken without prior approval or authorization pursuant to the terms of this Code.
All development shall comply with the applicable terms, conditions, requirements, standards and procedures
established in this Section and the Code. The submittal of an application for approval pursuant to the
provisions of these Subdivision Regulations constitutes consent to , and agreement to comply with , all of its
applicable provisions.
This Section establishes procedural and substantive rules for obtaining the necessary approval to develop land
and construct buildings and structures. Development applications will be reviewed for compliance with the
City’s Comprehensive Plan, Civic Master Plan, Beaufort Preservation Manual, and this Code.
Scheduling of the review of development applications before Staff, TRC, the Planning Commission or City
Council is at the discretion of the City . Any change to a development application by an Applicant after formal
submittal of that application to the City constitutes a decision by the Applicant that may result in the City
deciding to vacate the Hearing and/or void the pending application. The City may then reschedule or cancel
the review of the development application at its discretion.
Prior to formal submittal of any subdivision application identified in this Section, the Planning Department will
typically provide to an applicant an individualized submittal checklist indicating the documents and
information needed, quantities of those documents to be submitted, and the referral agencies that will be
involved in the review process. T he applicants are responsible for being fully familiar with all applicable
provisions of these Subdivision Regulations. Upon determination by staff that a sub mittal constitutes a
complete development application, the City will forward the packets to each referral agency.
7.5.2 SUBDIVISION TYPES AND PROCESS OUTLINES
Methods of land subdivision. There are two ways to subdivide land based on the magnitude of scale: Minor
Subdivision and Major Subdivision.
A. Minor Subdivisions.
Definition. A Minor Subdivision is a subdivision, or amendment to a subdivision, which has been previously
platted, includes no additional public right-of-way dedication, and includes one or more of the following:
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 27 of 41
1. The boundaries of five (5) or fewer lots are created from one parent tract or lot, no further subdivisions
shall be allowed from any lot created or the parent tract;
2. Any lot line adjustment;
3. A consolidation of multiple lots into one when a new street or street change is not involved.
B. Major Subdivisions.
Definition. A Major Subdivision is a subdivision which includes one or more of the following:
1. Dedication of public right-of-way, public infrastructure or other public tracts, or a private road; or
2. The subdivision consists of six or more lots or tracts.
3. The creation of lots on property that has never previously been platted.
7.5.3 SKETCH PLAN
A. Sketch Plan purpose. The Sketch Plan is a conceptual design of the development submitted with a major
subdivision application, that depicts what the applicant envisions for the overall development, including
zoning, transportation, pedestrian network, parks, tree canopy, open space, and other amenities. The
purpose is to allow the Applicant, the Planning Commission, and the Community the opportunity to discuss
the conceptual subdivision before it goes through the major subdivision platting process.
B. Requirements. A Sketch Plan shall be submitted and provided to staff in advance of any public and/or
community meeting for all major subdivisions. Major proposed changes to any approved preliminary plat(s)
may require a new Sketch Plan approval if the Code Administrator determines the changes are significantly
different from the sketch plan discussed at the public meeting .
The Sketch Plan shall consist of the following elements:
1. Road plan: The applicant shall provide a preliminary traffic plan that addresses the following elements:
a. The proposed street network and connectivity to the existing road network, including all
proposed access points.
b. The location and layout of all arterial and collector roads within the development.
c. A current preliminary traffic impact study prepared by a licensed traffic engineer which
evaluates proposed access points, the existing street system, and any need for any road
improvements (including off-site improvements) created by the proposed development.
2. Open space plan: The applicant shall provide a preliminary open space plan that depicts compliance
with Section 7.4 of this code, with the following elements:
a. Proposed open space distribution and location, including percentage of open space.
b. Compliance with 7.4.2 Community Green Space and Community Open Space Requirement .
c. Required buffer areas as per Section 5.5.1.
d. Wetland areas and setbacks as determined by SCDES-BCM, if applicable.
e. Proposed park locations, acreage, and types of parks as per Section 7.4.
3. Pedestrian network:
a. Location of all trails within development, and connection to existing trail network.
b. Connectivity of sidewalks to the existing pedestrian system, including any off -site sidewalk
improvements. This includes planning for a one-quarter mile pedestrian shed.
c. Depiction of any bike lanes or any other multi-modal features.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 28 of 41
4. Zoning/Design:
a. The location of zoning boundaries shall be provided with the application and depicted on the
Sketch Plan.
b. The plan should show how the zoning is harmonious with the surrounding area, and within
the property itself.
c. Conceptual building design and massing.
5. Overall utility plan:
a. A letter from the appropriate utility, confirming the existing capacity of the surrounding
utility system, and the future capacity of the utility system for the proposal. Utility plans for
the interior of the development (such as water and sewer service lines) are not required as
part of this process.
b. Proposed connections to the existing utility system.
C. Sketch Plan application submittal. The applicant shall submit a complete Sketch Plan application package
to the City. The application package shall include the following items:
1. Development application form, fee.
2. Title commitment. The title commitment must be dated no more than 9 0 days f rom the date of
Sketch Plan application submittal.
3. Title of project.
4. North arrow, scale (not greater than one inch equals 200 feet) and date of preparation.
5. Vicinity map.
6. Legal description.
7. Acreage of property; acreage in each zoning district; acreage in parks; acreage in open space.
8. USGS topographic contours.
9. Location and approximate acreage of proposed land uses.
10. Existing easements and rights-of-way on or adjacent to the property
11. Existing streets on or adjacent to the property (show and label street name).
12. Note or table indicating how public dedication requirements will be met.
13. Table providing the following information for each proposed land use area: total acreage; proposed
density proposed number of dwelling units and/or commercial buildings.
14. Location and acreage of proposed open space and parks as per Section 7.4., trails, regional trail
connections, playgrounds, schools or other public uses.
15. Proposed street system depicting the location and layout of all arterial and collector roads within the
development.
16. A preliminary traffic study prepared by a licensed traffic engineer which evaluates proposed access
points, the existing street system, and any need for any road improvements (including off -site
improvements) created by the proposed development.
17. Floodplain boundary with a note regarding the source of information (if a floodplain does not exist
on the property, this must be stated).
18. Zoning on adjoining properties.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 29 of 41
19. A letter from the appropriate utility, confirming the existing capacity of the surrounding utility
system, and the future capacity of the utility system for the proposal. Utility Plans for the interior of
the development (such as water and sewer service lines) are not required as part of this process.
20. Proposed connections to the existing utility system.
21. The location of any proposed or required lift stations.
22. Design rationale — description of how the development is integrated with surrounding area, how it
responds to site features/constraints and how it is consistent with this Code.
23. General description of plan for drainage and storm water management, including any regional
drainage solutions.
24. Description of how the proposed development complies with the City Comprehensive Plan.
D. Application certification of completion. Within 30 days, staff shall either certify the application is complete
and in compliance with all submittal requirements or reject it as incomplete and notify the applicant of any
deficiencies. Applicant shall then correct any deficiencies in the applicat ion package and re -submit the
application to the City.
E. Sketch Plan Process.
1. Planning Commission Meeting. The Planning Commission shall hold a public meeting to review and
provide comments on the Sketch Plan.
2. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting by regular mail to neighboring property owners within 500 feet of the property
per this Code.
F. Sketch Plan review criteria . The Planning Commission shall use the following criteria in addition to other
applicable provisions of this Code to evaluate the applicant's application:
1. The land use mix within the project conforms to Beaufort 's Zoning District Map and Comprehensive
Plan Preferred Land Use Map and furthers the goals and policies of the Comprehensive Plan.
2. The Sketch Plan represents a functional system of land use and is consistent with the rationale and
criteria set forth in this Chapter, the City’s Comprehensive Plan, and the Civic Master Plan as
amended.
3. The preliminary traffic, open space, park, utility, and pedestrian design is adequate and functional
given the existing and planned capacities of each system, and meets the standards found in this Code.
4. The conceptual design and massing proposed is consistent with the requirements of the
Development Code.
G. Timeframe related to approval of Sketch Plan . After a period of 12 months has passed without submittal
of a Preliminary Plat application, the Codes Administrator may require an applicant to submit a new Sketch
Plan application for Planning Commission review.
H. Minor amendments. Minor amendments to the Sketch Plan may be approved administratively under the
following conditions:
1. Does not change any land use, or location of any land use.
2. Does not change the number of lots or density by more than ten percent.
3. Does not contain significant changes in arterial or collector street alignment and/or access points, or
other major public elements such as drainage improvements, utility lines or facilities.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 30 of 41
4. Does not change any measurable standard (other than above), such as open space, or park area, by
more than ten percent.
7.5.4 PRELIMINARY PLAT
A. Preliminary Plat purpose. The purpose of the preliminary plat is to provide the City with an overall plat and
the associated preliminary engineering for the proposed development.
B. Preliminary Plat application process.
1. Pre-application conference. A pre-application conference/TRC with the City is required before the
applicant may submit a preliminary plat application. Topics to be discussed will include:
a. The provisions of this Code and the applicable requirements;
b. The application and review process;
c. Submittal requirements; and
d. Changes or modifications based on direction from the Planning Commission at Sketch Plan
approval.
2. Preliminary Plat application submittal. Following review of the Sketch Plan, the applicant may
submit the complete preliminary plat application to the City. The preliminary plat application
package shall be formatted and packaged per the application submittal checklist provided by the City
and include the following items in both printed and electronic formats:
a. Development application form;
b. Application fee;
c. Title commitment. The title commitment must be current and dated no more than 120 days from
the date of preliminary plat application submittal; and
d. The preliminary plat that shall provide the following information:
i. Title of project.
ii. North arrow, scale (not greater than one inch equals 100 feet) and date of preparation.
iii. Vicinity map.
iv. Names and addresses of owners, applicant, engineers and surveyors.
v. Legal description.
vi. Total acreage of property.
vii. Existing contours at two-foot intervals (based on USGS datum).
viii. Name and location of abutting subdivisions or owners of abutting property (if land is not
platted)
ix. Lots, blocks, and street layout (with cross -sections), dimensions and square footage for
each lot. Dimensions and square footages may be rounded to the nearest whole number.
x. Consecutive numbering of all lots and blocks.
xi. Existing and proposed easements (including rights -of-way) on and adjacent to the
property.
xii. Existing and proposed zoning on and adjacent to property.
xiii. Approximate location and size of existing sewer lines, water lines and fire hydrants.
Approximate location of proposed sewer lines, water lines, and fire hydrants with a letter
from BJWSA and the Fire Marshall.
xiv. Location by field survey or aerial photography of existing and proposed water courses and
bodies of water such as irrigation ditches and lakes. Water courses shall include direction
of flow.
xv. Tree Survey and with Existing Tree Canopy Survey.
xvi. Floodplain boundary with a note regarding source of information (if a floodplain does not
exist on the property, state this on the plan).
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 31 of 41
xvii. The boundaries of proposed phases of the subdivision if the final plat is intended to be
submitted in multiple phases.
xviii. General location of existing surface improvements such as buildings, fences, or other
structures which will remain on the property as part of the subdivision.
xix. Location and acreage of proposed parks, trails, playgrounds, schools or other public uses.
xx. Location, function, ownership and manner of maintenance of any private open space.
xxi. Land use table including land uses, approximate acreage of each land use type,
percentage of each land use type density (net and gross) and how public dedication
requirement will be met.
xxii. Total number of lots.
xxiii. Number of each type of dwelling unit proposed.
xxiv. An AutoCAD drawing file of the Preliminary Plat in a format specified by the City Engineer
or Codes Administrator.
xxv. Surveyor's certificate.
xxvi. Traffic impact analysis (if applicable) as per the requirements found in
this development code.
3. Preliminary Plat drawing standards . The preliminary plat drawing shall comply with the following
standards:
a. The preliminary plat shall be prepared by or under the direct supervision of a registered land
surveyor, shall be signed and stamped by said surveyor, and shall meet applicable State of South
Carolina requirements.
b. Except for parcels separated by easements (including public rights -of-way), public tracts, or
railroads, parcels not contiguous with each other shall not be included in one plat, nor shall more
than one plat be made on the same sheet. Contiguous parcels owned by different parties may be
included on one plat, provided that all owners join in the dedication and acknowledgment.
c. Lengths on the preliminary plat boundary shall be shown to the nearest hundredth of a foot and
bearings shall be shown in degrees, minutes and seconds.
d. Bearings, distances and curve data of all perimeter boundary lines shall be indicated outside the
boundary line, not inside, with the lot dimensions.
e. Names and signatures of all owners of equitable interest in the property shall be on the
preliminary plat and shall be made in black drawing ink.
4. Explanation of how the plat is consistent with this Code, the Comprehensive Plan, the Civic Master
Plan, and the Sketch Plan.
5. Preliminary grading and drainage plan and report. This plan and report must be certified by a South
Carolina registered professional engineer or Land Surveyor and include approximate earthwork
quantities (how earthwork on the site is "balanced"), storm drainage concepts such as locations of
pipe and other conveyance facilities, locations for on -site detention or downstream structural
improvements, and soil eros ion and sedimentation control plans and specifications. It must also
discuss the impacts on and to any existing floodways and/or floodplains both on and adjacent to the
site as well as any FEMA applications or approvals that may be required.
6. Preliminary water and sewer plan and study. This plan shall be prepared by a registered professional
engineer. It is necessary that the engineer consult with the appropriate utility service providers
regarding the design of all utilities through the subdivision.
7. Preliminary landscape and open space plan. The landscape plan must address the treatment of all
exterior spaces. Landscape plans are to be designed to meet the requirements of this Code and show
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 32 of 41
approximate locations of trees, shrubs, groundcovers, turf, buffering, fences, walls and other site
amenities that will be included in the plan.
8. Traffic study. A TIA with requirements consistent with Section 7. 3.2. This study must be prepared
by a professional traffic engineer and identify the projected impacts to the local and regional traffic
system. The direct roadway impacts and proposed share in the cost of regional improvements and
intersections must be identified for the project.
9. Archaeological Impact Assessment. An applicant may be required to provide the City as per Section
8.4 with a CHS records listing historically or archaeologically significant findings on the property
being subdivided at their expense.
10. General ecological resource survey. Prepared by a qualified biologist, geologist, ecologist, or similar
qualified professional, a survey identifying the potential/absence/habitat of a threatened or
endangered species and wetlands or other ecologically sensitive area. Said survey shall make
practical recommendations regarding treatment or mitigation of the findings.
11. Conceptual Design. Applicant should provide conceptual design and massing examples, (i.e.
conceptual elevations, but not required for each individual lot , consistent with the requirements of
the Development Code
C. Planning Commission Hearing. The Planning Commission shall hold a public hearing to approve, approve
with conditions or deny the Preliminary Plat.
1. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission hearing by regular mail to neighboring property owners within 500 feet of the property
per this Code.
2. Approval. The Planning Commission shall review and act on the Preliminary Plat . The Planning
Commission shall approve, approve with conditions, or deny the Preliminary Plat based on the review
criteria below.
D. Preliminary Plat review criteria. In addition to all provisions of this Code, the Planning Commission shall
use the following criteria to evaluate the applicant's request:
1. The Preliminary Plat represents a functional system of land use and is consistent with the rationale
and criteria set forth in this Code.
2. The land use mix within the project conforms to the City’s Development Code and complies with the
Comprehensive Plan and Civic Master Plan.
3. The utility and transportation design are adequate, given existing and planned capacities of those
systems.
4. Lot layout, including structure location and design of each lot.
E. Phasing. The preliminary plat shall designate the boundaries of phases for which separate final plats will
be presented for approval. Each phase, either alone or in conjunction with previously approved and
recorded phases, must meet all of the requirements of this Code.
F. Early grading. After approval of a Preliminary Plat, Applicant may proceed with preliminary grading of the
project area if a construction plan set for grading and drainage is approved and memo authorizing grading
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 33 of 41
work is issued by the City Engineer or Codes Administrator . Early grading and storage of construction
related equipment is at the risk of the Applicant and no presumption of any Final Plat approval at the
Planning Commission is expressed or implied by any authorization of early grading.
G. Timeframe related to approval of Preliminary Plat. A preliminary plat is in full force and effect for a period
of two years from date of approval . Approval will automatically expire at the end of t wo years unless an
applicant formally requests an 18 month extension from the Planning Commission prior to termination or
submits a completed final plat application for all or a portion of the property.
7.5.5 FINAL PLAT
A. Final Plat purpose. The purpose of the final plat is to complete the subdivision of land consistent with the
technical standards of the City of Beaufort.
B. Final Plat application process.
1. Final Plat application submittal. The final plat application shall substantially conform to the
preliminary plat as approved at the public hearing and shall meet all conditions of approval. The
applicant shall submit the completed final plat application package to the City. The final plat
application shall be formatted and packaged per the application submittal checklist provided by the
City and include:
a. Development application form.
b. Application fee.
c. Title commitment. An updated title commitment, dated no more than 120 days from the date
of final plat application submittal.
2. Final Plat Standards. The final plat drawing shall comply with the following standards:
a. All requirements of Section 7.5.4.
b. The plat shall be prepared by or under the direct supervision of a registered land surveyor, shall
be signed and stamped by said surveyor, and shall meet applicable State of South Carolina
requirements.
c. Existing and proposed easements (including rights -of-way) in and adjacent to property (labeled
and dimensioned).
d. Existing and proposed street names for all streets on and adjacent to the property.
e. Final Traffic Impact Analysis (if applicable) as per the requirements found in the Development
Code.
f. If applicable, p rior to commencement of construction; a State Highway utility permit from
SCDOT.
g. If applicable, p rior to commencement of construction, a State Highway access permit from
SCDOT.
h. If applicable, p rior to commencement of construction, a construction dewatering permit from
DHEC
i. If applicable, p rior to commencement of construction, a 404 Permit from the Army Corps of
Engineers.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 34 of 41
j. Prior to commencement of construction, acceptable collateral in the amount and form
stipulated in Section 7.1.5.
3. Original plats. The applicant shall submit to the City, five original, signed copies of the final plat ready
to record, and final executed copies of all agreements.
4. Complete engineering plans and specifications. As a condition of Final Plat approval the applicant
shall prepare and submit the following:
a. Construction plans and profiles. The plans and profiles shall be prepared by a registered
professional engineer licensed in the State of South Carolina. Plans shall be 24 inches high by 36
inches wide and provide the following information:
b. The horizontal to vertical scales shall be chosen to best depict the aspects of the design.
c. Minimum horizontal scale: One inch equals 100 feet.
d. Minimum vertical scale: One inch equals ten feet.
e. The typical road geometric and structural cross-section is to be shown on each plan sheet.
f. The plan must show right -of-way lines and widths, road names, lot lines, tangent lengths and
bearings, curve radii, delta angles, curve lengths, chord lengths and bearings, stationing at all
beginning of curves and end of curves, intersections, structures, angles, curb lines, cross pans,
traffic control devices (islands, striping, signs, etc.), drive cuts, curb returns and radii, and all
other features to enable construction in accordance with approved standards and standard
engineering practice. Stationing may be centerline if approved by the City Engineer or Codes
Administrator. Construction plans shall include water lines and appurtenances, sewer lines and
appurtenances, and storm water lines and appurtenances and any other wet utilities .
g. The profiles shall include existing and proposed grade at curb and gutter or centerline of street
elevation at point of intersection of vertical curves, intersections, grade breaks, point of curb
return (PCR), point of reverse curve (PRC), and other critical points, structures, and all other
features.
h. Signature blocks for all utility providers unless otherwise provided in agreement form.
i. Structure details. Sufficient data shall be given to construction of major structures and road
appurtenances such as bridges, culverts, gutters, drives, walks, cross pans, etc; detail shall
include orientation line and grade, cross -sections, dimensions, re inforcement schedules,
materials, quality specification, etc., or as the City Engineer may approve.
j. Final Water Report. A final water report including hydraulic analysis and pipe sizing calculations.
Note, this report can be verified by BJWSA and does not need to be submitted to the City.
k. Final Sanitary Sewer Report. A sanitary sewer report including hydraulic analysis and pipe sizing
calculations. Note, this report can be verified by BJWSA and does not need to be submitted to
the City.
l. Sewage collection and water supply distribution plans, profiles and specifications. The plans,
profiles and specifications shall be prepared by a registered professional engineer and shall be
accompanied by written approvals from BJWSA.
m. Final drainage plans and reports. Based upon the approved preliminary drainage plan, a final
report is to be submitted in accordance with SOLOCO Drainage and Design Criteria, as amended
or as the City Engineer may approve. The plan and report must provide:
n. Erosion control plans, when required.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 35 of 41
o. Sizing of all pipes, inlets, conveyance ways, and other appurtenances.
p. Final grading plan. The final grading plan shall be 24 inches high by 36 inches wide and illustrate
existing and proposed contours and lot and block grading details.
q. Soils report. The soils report shall detail pavement design and construction requirements and
shall be submitted after overlot grading is complete.
r. Final landscape and open space plan. The landscape plan must address the treatment of all
exterior spaces. Landscape plans are to be designed to meet the requirements of this Code and
show trees, shrubs, groundcovers, turf, buffering, fences, walls and other site amenities that will
be included in the plan. All plant materials must be adapted to the physical limitations of the
local climate and specific conditions of the landscape plan. All plant materials must meet
specifications of the American Association of Nurseryman for number one grade. All street trees
must be selected from the City of Beaufort recommended tree list.
s. Landscape Plan drawn to scale (not greater than one inch equals 50 feet) on 24 by 36-inch sheets
which includes:
i. Project name.
ii. Scale, north arrow and date of preparation.
iii. Existing and proposed streets and street names.
iv. Lot lines, easements and public rights-of-way as shown on the subdivision plat, including
gross and net area of all parcels.
v. Location of proposed building footprints and parking areas.
vi. Location of storage, loading and service areas.
vii. Existing and proposed two-foot contours (based on USGS datum).
viii. Natural features, wetlands, wildlife corridors, floodplains, streams, ditches and other
waterways.
ix. The location of existing and proposed utilities. Utility lines can be 'ghosted' in on the
landscape plan to vary the line types for cleaner drawings.
x. All existing trees within the proposed site and adjacent to the site must be accurately
identified on the plan. Existing trees must be labeled as to their size, species and if they
are intended to remain, be removed or transplanted. All replacement mitigat ion trees
will need to be shown separately on the plan. Tree protection standards for existing trees
to remain shall be included on the plan.
xi. The extent and location of proposed trees, shrubs and perennials and quantities of each
species. Plant materials are to be drawn at two-thirds of their mature size.
xii. Landscape schedule including the represented plant symbol, Latin name, common name,
planting size and number of individual plants. All plant materials are to meet the
minimum size requirements as provided in this Code.
xiii. Proposed treatment of all ground surfaces must be clearly indicated, including turf,
paving, mulch, native grass, seeded grass, etc. Grass areas are to be specified as seed or
sod, and a seed mix/rate specified.
xiv. Sight distance triangles must be shown at street intersections pursuant to this Code.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 36 of 41
xv. Project specific landscape notes and details to ensure the proper planting, establishment
and survival of plant materials. Additional notes detailing the warranty for plant materials
and continued maintenance shall be included.
xvi. Open space and pedestrian circulation system.
xvii. Proposed grading of the project site, including drainage swales, detention basins,
retaining walls and any off-site infrastructure improvements.
xviii. Notes for conservation and retention of topsoil and landscape soil preparation.
xix. Restoration, revegetation or enhancement of disturbed natural areas or open space
feature.
xx. Park structures, signage, play equipment, and other landscape or park amenities and
appurtenances.
xxi. A "pdf" file and an AutoCAD drawing file of the final plat in an electronic format specified
by the City Engineer.
5. Post approval actions. Prior to issuance of a building or grading permit, the applicant shall submit
the following documentation to the City:
a. List of contractors. List of all contractors that will be performing the improvements.
b. Proof of insurance/business license. Proof of workman's comprehensive insurance and liability
insurance for each contractor and business license.
c. Open space deed restriction. Areas designated as open space shall be protected by a deed
restriction or other appropriate method to ensure that they cannot be subdivided or developed
in the future and will remain as open space until the use is modified by the City.
d. Construction traffic control plan. Applicant will develop a plan for City Engineer, Codes
Administrator or appointee, review that addresses construction traffic, construction water,
temporary road closures, street repairs, dust, noise and other construction- related concerns.
e. Other certificates, affidavits, enforcements or deductions as required by the City .
C. Approval. The City Codes Administrator shall review and act on the Final Plat. The Codes Administrator
may choose to approve, approve with conditions, or deny the Final Plat based on the criteria below.
1. Final Plat review criteria. In addition to all provisions of this Code, the Codes Administrator uses the
following criteria to evaluate the applicant's final plat application:
a. The Final Plat is in substantial conformance with the approved Preliminary Plat. For the purposes
of this Code, "substantial conformance", includes design adjustments made to meet any
conditions of preliminary plat approval, and is determined as follows:
b. Does not change any land use.
c. Does not contain changes which would render the final plat in nonconformance with
requirements of this Code.
d. Does not contain significant changes in street alignment and/or access points, or other public
elements such as drainage improvements, utility lines or facilities.
e. Does not increase density.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 37 of 41
D. Timeframe related to approval of Final Plat. A final plat is in full force and effect for a period of two years
from date of recordation unless a longer timeframe is specifically allowed by the City in an approved
Development Agreement or unless public improvements are completed and accepted on all or a portion
of the final plat. Applicants may formally request one 18 month extension from the C odes Administrator
prior to termination of final plat approval. Prior to the expiration of the original two year timeframe or the
extension timeframe, an applicant may formally request an additional extension if substantial progress
has been made on installation of public improvements.
7.5.6 MINOR SUBDIVISION PLAT
A. Minor Subdivision Plat purpose.
1. The purpose of the Minor Subdivision Plat is a subdivision, or amendment to a subdivision, which has
been previously platted, includes no additional public right -of-way dedication, and includes one or
more of the following:
a. The boundaries of five or fewer lots are created from one parent tract or lot, cumulatively and
not more than 3 acres; (ex. any portion of a tract that is subdivided counts toward the five total,
and does not itself become a new parent tract to subdivide an additional five lots from)
b. Any lot line adjustment, consolidation of multiple lots into one.
B. Minor Subdivision plat application submittal. The applicant shall submit the complete Minor Subdivision
plat application package to the City. The application shall be formatted and packaged per the application
submittal checklist provided by the City and include:
1. Development application form.
2. Application fee.
3. Title commitment. A current title commitment, dated no more than 30 days from the date of minor
subdivision plat application submittal
C. Minor Subdivision plat standards. The plat drawing shall comply with the following standards:
1. The plat shall be prepared by or under the direct supervision of a registered land surveyor and meet
applicable State of South Carolina requirements.
2. Except for parcels separated by public rights -of-way, public tracts, or railroads, parcels not
contiguous shall not be included in one plat, nor shall more than one plat be made on the same
sheet. Contiguous parcels owned by different parties may be included on one plat, provided that all
owners join in the dedication and acknowledgment.
3. Lengths shall be shown to the nearest hundredth of a foot and bearings shall be shown in degrees,
minutes and seconds.
4. Bearings, distances and curve data of all perimeter boundary lines shall be indicated outside the
boundary line, not inside, with the lot dimensions.
5. All signatures shall be made in black drawing ink.
6. Title of project.
7. North arrow, scale (not greater than one inch equals 100 feet) and date of preparation.
8. Vicinity map.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 38 of 41
9. Legal description.
10. Basis for establishing bearing.
11. Names and addresses of owners, applicant, designers, engineers and surveyors.
12. Total acreage of subdivision.
13. Bearings, distances, chords, radii, central angles and tangent links for the perimeter and all lots,
blocks, rights-of-way and easements.
14. Lot and block numbers, numbered in consecutive order, and square footage or acreage to two
decimal places of each lot or tract.
15. Parcels excepted from inclusion noted as "not included in this subdivision" and the boundary
completely indicated by bearings and distances.
16. Existing rights-of-way in and adjacent to subject property (labeled and dimensioned).
17. Existing and proposed street names for all streets on and adjacent to the property.
18. Existing easements and their type in and adjacent to subject property (labeled and dimensioned).
19. Location and description of monuments:
i. Floodplain boundary with a note regarding source of information (if a floodplain does not
exist on the property, please state this on the plat).
20. Certificates blocks for signatures of owner, surveyor, utility providers, and City approval, as
applicable.
D. Record Minor Subdivision Plat. Five signed copies of the minor subdivision plat shall be delivered to the
City. The applicant will be responsible to record the minor subdivision plat with Beaufort County.
7.5.7 SITE PLAN
A. Site Plan Purpose . The site plan is a prerequisite to a building permit for all multi -family (excluding
duplexes), commercial, and industrial developments. The site plan shows how the lot will be developed so
that the City can ensure that the site design will be in complia nce with the Development Code,
Comprehensive Plan and Civic Master Plan.
B. Site Plan Application. A Site Plan Application shall include the following:
1. Land use application form.
2. Application fee and fee agreement.
3. Site Plan plat — The site plan shall be a minimum of 18 inches by 24 inches and shall provide the
following information:
a. Title of project.
b. North arrow, scale (no greater than one inch equals 50 feet) and date of preparation.
c. Vicinity map.
d. Address of project.
e. Legal description of property.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 39 of 41
f. Name, address and phone number of property owner.
g. Name, address and phone number of person or firm responsible for plan.
h. Lot size (square footage).
i. Bearings and distances of all lot lines.
j. Existing and proposed easements and rights-of-way.
k. Existing and proposed paved areas and sidewalks on the site and in the adjacent rights -of-way, all
dimensioned, showing how pedestrians will have access to the site and buildings.
l. Gathering areas for people.
m. Existing and proposed curb cuts on the site and in the adjacent rights -of-way (on both sides of
perimeter streets), all dimensioned.
n. Existing and proposed two-foot contours.
o. Existing waterways on or adjacent to the site.
p. Finished floor elevations for all structures.
q. Footprint (including roof overhangs and eaves, decks, balconies, outside stairs and landings) of all
proposed structures and their use with their dimensions and locations noted with respect to the
property lines.
r. Existing structures and their use.
s. Square footage of the proposed building(s) and the footprint of the proposed building(s).
t. Proposed structure height.
u. For multi-family residential, the number of residential units and bedrooms per unit.
v. Location of proposed signs and lighting.
w. Specifications for the signs and lights, including type, height and general conformance to the Code.
For commercial and industrial uses, a photometric plan prepared by a qualified electrical or lighting
engineer shall be submitted that depicts all lighting fixtures and the light spread (in footcandles)
of these fixtures across the site to all property boundaries.
x. Proposed traffic controls and striping for parking areas (all lanes, driveways, and parking spaces
must be dimensioned).
y. Trash disposal areas and enclosures including specifications for enclosures.
z. Location and size of existing and proposed water and sewer service connections and tap sizes.
aa. Location and size of water and sewer lines to which the service connections will be or are made.
bb. Location and size of water meter(s).
cc. Location and size of backflow-prevention devices.
dd. Indication of how and where perimeter drain will drain (if one exists).
ee. Location of existing electrical lines and poles on or adjacent to the site.
ff. Location of proposed electrical service connection and meter location.
gg. Location of electric transformer.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 40 of 41
hh. Location of all fire hydrants. If none exist on site, note distance and direction of the closest hydrant
adjacent to the site within 500 feet.
ii. Location of detention/retention areas and storm sewer infrastructure with the required drainage
easements.
jj. The distance from the proposed building(s) or structure(s) to adjacent lot lines, easements, and
adjacent structures.
kk. A land use chart (table).
ll. Certificate blocks for signatures of owner, surveyor, utility providers, and City approval, as
applicable.
4. Design standards — Demonstrate in written or graphic form how the proposed structure(s) is
consistent with the design requirements of this code . Provide elevations of proposed
structures/graphic visual aids. Provide complete building elevations, drawn to scale, with illustrations
of all colors and identifying major materials and cut sheets to be used in the structure(s). In addition,
Staff may require buil ding floor plans, sectional drawings, perspective drawings, models, and/or
computer visualizations when the impacts of a proposal warrant such information.
5. Certified drainage report — A certified drainage report, including an erosion control study and plan,
as applicable, must be reviewed and approved by the appropriate sanitation district (if applicable)
prior to submittal of the report to the City as part of the site plan application.
6. Final landscape and open space plan — Provide an existing and proposed landscape plan with tree
protection zones and a tree survey, and open space plan consistent with Sections 5 and 7 within this
Code.
7. Traffic Impact Analysis — Provide TIA as per requirements of Section 7.3.2.
C. TRC and Staff Review. Staff and TRC reviews application and prepares comments. Staff and TRC will review
the site plan map to ensure it is consistent with the site plan review criteria. Following the review, Staff will
prepare a written report outlining any changes that the applicant must make before the site plan can be
recommended for public hearing with the Planning Commission . This report will be forwarded to the
applicant.
1. Applicant addresses staff comments. Applicant shall make all necessary changes to the site plan and
resubmit a revised copy to the City.
D. Planning Commission Hearing.
1. Notice to neighboring property owners. The City shall send advance notice of the Planning
Commission meeting by regular mail to neighboring property owners within 500 feet of the property
per this Code.
2. The Planning Commission shall hold a public hearing on the proposal. The applicant and other
property owners likely to be materially affected by the application shall be given an opportunity to
be heard.
3. At the conclusion of the public hearing , the Planning Commission may approve, deny, or approve
with conditions the application for a Major Development. No Major Development shall be approved
unless the following findings of fact are made:
a. The plan is consistent with the City of Beaufort Comprehensive Plan and Civic Master Plan.
CHAPTER 7: LAND DEVELOPMENT Latest revisions as of: 12/23/2024
Page 41 of 41
b. The plan complies with all applicable requirements of this Code.
c. There exists adequate infrastructure (transportation and utilities) to support the plan as proposed.
d. The plan conforms to the character of the neighborhood, considering the location, type and height
of buildings or structures and the type and extent of landscaping on the site.
E. Post approval actions.
1. Building Permit. A building permit shall be issued only when a site plan has been approved. However,
with the approval of the City, an applicant may submit a building permit application concurrent with
the site plan application. Building permits shall not be issued for any development that is not in
conformance with the approved site plan.
2. Phasing and expiration of approval. The site plan shall be effective for a period of three years from
the date of approval, unless stated otherwise in the written site plan approval. Building permits shall
not be issued based on site plans that have an approval date more than three years old. For multi -
phased plans, building permits shall not be issued based on an approval date more than three years
from the date of Phase I approval.
F. Appeals. Any party aggrieved by the decisions of the Planning Commission may appeal to the Circuit Court
within 30 days of the decision.
G. Permit Validity. Upon the approval of the Major Development Design application, the applicant shall have 2
years to obtain a Project Permit. Failure to secure a permit for the permitted work within this time shall
render the compliance void. Any change to the approved plans that has not been authorized by the
Administrator shall invalidate the design approval, and any subsequent building permits.
H. Permit Extension. The Administrator may grant a one year extension of this time period upon submittal by
the applicant of sufficient justification for the extension. Extensions shall be submitted at least 1 month prior
to the expiration date.
I. Amendments to approved Site Plans.
1. Minor variations in the location of structures, improvements, or open space areas caused by
engineering or other unforeseen difficulties may be reviewed and approved by the City Staff. Such
changes shall not exceed ten percent of any measurable standard or modify the use, character, or
density of an approved site plan. All plans so modified shall be revised to show the authorized
changes and shall become a part of the permanent records of the City.
2. Changes to approved site plans that exceed the ten percent threshold, or other major modifications
(such as changes in building size or footprint, relocation of access points, changes to required
parking, etc.), shall be considered as a new site plan appli cation. Such amendments shall require
Planning Commission review and approval to become effective. A complete site plan application shall
be prepared and submitted in compliance with the requirements set forth in this Sectio n.
DEVELOPMENT CODE
CHAPTER 9 AMENDMENTS
(with track changes)
Beaufort, South Carolina, The Beaufort Development Code
9: DEVELOPMENT REVIEW PROCEDURES
Beaufort, South Carolina, The Beaufort Development Code Created: 2023-12-08 08:25:16 [EST]
(Supp. No. 1)
Page 1 of 50
9: DEVELOPMENT REVIEW PROCEDURES
9.1: PURPOSE AND GENERAL PROVISIONS
9.1.1 PURPOSE
In order to establish an orderly process to develop land within the jurisdiction of the City of Beaufort, the purpose
of this article is to provide a clear and comprehensible development process that is fair and equitable to all
interests, including the applicants, affected neighbors, city staff and related agencies, and the City Council.
9.1.2 APPLICABILITY
The provisions of this article shall be applicable to all development activity under the jurisdiction of the City of
Beaufort.
9.1.3 CONFORMITY WITH CODE
The Administrator shall not issue a permit or license for any use, building, or purpose that conflicts with any
provision of this Code. Any permit, license or certificate issued in conflict with the provisions of this Code, whether
intentionally or unintentionally, shall be null and void.
9.1.4 PERMIT/DEVELOPMENT DESIGN REVIEW/HISTORIC REVIEW PROCESS TYPE TABLE
See following pages.
Created: 2023-12-08 08:25:14 [EST]
(Supp. No. 1)
Page 2 of 50
PERMIT/PROCESS
TYPE SECTION PERMIT/PROCESS
TYPE
REVIEWING
AGENCY
PUBLIC
NOTIFICATION
(9.1.3)
APPROVING
AGENCY
APPEAL
PROCESS
PERMIT
PERIOD
PERMIT
EXTENSION
ADMINISTRATIVE PERMITS
Zoning Permit 9.5 Administrative Admin None Admin ZBOA 6 months 6 months,
1 time
Building Project
Permit
9.5 Administrative Admin None Admin ZBOA 6 months Resubmit
Certificate of
Compliance
9.5 Administrative Admin None Admin ZBOA n/a n/a
Certificate of
Occupancy
9.6 Administrative Admin None Admin ZBOA n/a n/a
DEVELOPMENT DESIGN REVIEW
Development
Design Review,
Minor
9.7 Administrative Admin None Admin PC 24 months 12 months,
1 timeup
to 5 times
Development
Design Review,
Major
9.7 Discretionary Admin, TRC Yes -, Levels
1,2,3None
PC Court 30
days to
appeal
24 months 12 months,
up to 5
times 1
time
SUBDIVISION REVIEW
Subdivision,
Minor, Site Plan
9.8 Administrative Admin, TRC Yes, - Levels 1,
2, 3 timeNone
PCAdmin PCourt 24 months 12 months,
up to 5
times 1
time
Subdivision,
Major, Sketch
Plan
9.8 DiscussionDiscretionary Admin TRC Yes, - Levels 1,
2,3None
PC NoneCourt 2412
months
122
months, up
to 5 times
Created: 2023-12-08 08:25:14 [EST]
(Supp. No. 1)
Page 3 of 50
PERMIT TYPE SECTION PROCESS
TYPE
REVIEWING
AGENCY
PUBLIC
NOTIFICATION
(9.1.3)
APPROVING
AGENCY
APPEAL
PROCESS
PERMIT
PERIOD
PERMIT
EXTENSION
Subdivision,
Major,
Preliminary
PlatSite Plan
9.8 Administrative Admin, TRC Yes, - Levels 1,
2, 3None
PCAdmin PC
Court
24 months 12 months,
up to 51
times
Subdivision Final
Plant
9.8 Administrative Admin TRC None Admin PC 24 months 12 months,
up to 5 1
time times
HISTORIC PRESERVATION
Certificate of
Appropriateness,
Minor
9.9 Administrative Admin Demolition
Only: Yes (1,2,
3)
Admin HRB 24 months 12 months,
up to 35
times
Certificate of
Appropriateness,
Major
9.9 Discretionary Admin Demolition &
Design
Exception
only: Yes (1,2)
HRB Court 30
days to
appeal
24 months;
no
expiration
for
demolitions
12 months,
up to 53
times
Local Historic
District/Historic
Sign Designation
9.10 Legislative Admin, PC,
HRB
None CC Court n/a n/a
RELIEF
Administrative
Adjustment
9.11 Administrative Admin None Admin ZBOA 24 months 12 months,
up to 53
times
Special Exception 9.12 Discretionary Admin Yes (1, 2.3 ) ZBOA Court 30
days to
appeal
24 months 12 months,
up to 35
times
Variance 9.13 Discretionary Admin Yes (1, 2,3) ZBOA Court 30
days to
appeal
24 months 12 months,
up to 53
times
Created: 2023-12-08 08:25:14 [EST]
(Supp. No. 1)
Page 4 of 50
PERMIT TYPE SECTION PROCESS
TYPE
REVIEWING
AGENCY
PUBLIC
NOTIFICATION
(9.1.3)
APPROVING
AGENCY
APPEAL
PROCESS
PERMIT
PERIOD
PERMIT
EXTENSION
ADMINISTRATION APPEALS
Administrative
Appeal
9.14 Discretionary Admin Yes (1) ZBOA Court 30
days to
appeal
12 months 6 months
AMENDMENTS
Code
Amendments
9.16 Legislative Admin, PC Yes (1, 2 & 3) CC Court 30
days to
appeal
n/a n/a
Admin-Administrator / PC-Planning Commission / CC-City Council / ZBOA-Zoning Board of Appeals / HRB-Historic District Review Board / TRC-
Technical Review Committee / Court - Circuit Court
Note: Any appeals that are assigned to Court are eligible for pre-litigation mediation pursuant to § SC ST 6-29-1155
(Ord. No. O-14-23 , 9-26-2023)
Created: 2023-12-08 08:25:14 [EST]
(Supp. No. 1)
Page 5 of 50
9.1.5 PUBLIC NOTIFICATION
All public meetings shall be posted and advertised with the media as required by state law. The following
procedures have been established for development applications/petitions that require additional notification of
the public prior to consideration and/or approval.
A. Level 1—Published Notice:
1. Required Notification Type: A distinctive advertisement (public hearing notice) shall be placed by
the Administrator in a local newspaper of general circulation within the city.
2. Required Period of Notice: This notice shall be published not less than 15 calendar days prior to
the meeting.
3. Content of Notice:
a. The general location of land that is the subject of the application;
b. The tax map and parcel number, and street address if available;
c. The substance of the application, including the magnitude of proposed development and
the current zone;
d. The time, date, and location of the public hearing;
e. A phone number to contact the city;
f. A statement that interested parties may appear at the public hearing.
A. BASIC NOTICE, MINIMUM STANDARDS FOR NOTICE OF ALL MEETINGS AND HEARINGS:
Written public notice of dates, times and places of all City of Beaufort development review public
meetings and hearings shall be provided in accordance with South Carolina Code of Laws Section 30-4-
80, any other applicable provision of State Law and this Code. This includes at minimum posting of a
copy of the notice including the agenda in the building where the meeting shall be held, posting of the
notice, the agenda and the meeting materials packet on the website maintained by the City of
Beaufort, and notifications to persons, organizations and news media requesting such notice as
contemplated by Section 30-4-80 (E). While State Law requires a minimum of 24 hours written notice
in the absence of a special notice requirement, City Staff shall aspire to exceed this minimum standard
in the interest of transparency and so as to encourage public participation, and shall strive to post
notices, agendas and meeting packets one week p rior to any scheduled meeting; Public Bodies shall
entertain and consider any objections from the public based on notice that fails to meet this
aspirational standard.
B. Level 2—Posted Notice:
1. Required Notification Type: A notice of application sign shall be posted by the Administrator. The
sign shall be posted on the subject property in a location clearly visible from each street adjacent
to the property.
2. Required Period of Notice: This notice shall be posted not less than 15 calendar days prior to the
meeting at which the application will be reviewed.
3. Content of Notice:
a. Type of application;
b. The date of the public hearing;
c. A phone number to contact the city.
Commented [CK1]: Rewrite as suggested by Kim McFann.
Created: 2023-12-08 08:25:14 [EST]
(Supp. No. 1)
Page 6 of 50
B. PUBLICATION OF NOTICE OF A HEARING IN A NEWSPAPER:
When required by State Law, a distinctive advertisement (public hearing notice) shall be placed by the
Administrator in a local newspaper of general circulation within the city. This notice shall be published
in accordance with the time limits required by State Law, or if none not less than 15 calendar days
prior to the meeting. The content of said published notice shall all content required by State Law,
including without limitation the following:
1. The general location of land that is the subject of the application;
2. The tax map and parcel number, and street address if available;
3. The substance of the application, including the magnitude of proposed development and the
current zone;
4. The time, date, and location of the public hearing;
5. A phone number to contact the city;
6. A statement that interested parties may appear at the public hearing
C. Level 3—Mailed/Emailed Notice:
1. Unless otherwise required by state law, the city may choose to provide, at its discretion, mailed
and/or emailed notice in accordance with city policy, which may be amended from time to time.
2. For demolition of structures listed on the most recent "Above -Ground Historic Sites Survey" that
are located outside of the Historic District, written advance notice to members of the Historic
District Review Board, Historic Beaufort Foundation, and neighbors within 200 feet of the
property will be required at least 15 days before any permit is issued.
3. For all process types approved by the Planning Commission, written advance notice to all
property owners within 500 feet of the property will be required at least 15 days before the
Planning Commission meeting.
4. For all appeals, variances and special exceptions heard by the Board of Zoning Appeals, written
advance notice within 200 feet of the property will be required at least 15 days before the Board
of Zoning Appeals.
C. NOTICE OF APPLICATION SIGN:
A notice of application sign shall be posted by the Administrator on the subject property in a location
clearly visible from each street adjacent to the property as required by State Law, including without
limitation for all hearings on applications for zoning or rezoning, variances, special exceptions,
demolition, demolition and design exceptions, the notice shall be posted no less than 15 calendar days
prior to the hearing at which the application will be reviewed. The sign shall include the following
information:
A. Type of application;
B. The date, time and place of the public hearing;
C. A phone number to contact the city.
D. MAILED/EMAILED NOTICE:
Mailed/emailed notice shall be provided as required by State Law, including without limitation mailed
notice to adjoining property owners when required by State Law. Additionally, the City shall provide
mailed/emailed notices upon request as per South Carolina Code of Laws Section 3 0-4-80 (E) and per
the Policy and Procedures contained on the website operated by the City of Beaufort. For demolition
Commented [CK2]: Rewrite as suggested by Kim McFann.
Commented [CK3]: Rewrite as suggested by Kim McFann
Created: 2023-12-08 08:25:14 [EST]
(Supp. No. 1)
Page 7 of 50
of structures listed on the most recent “Above-Ground Historic Sites Survey” that are located outside
the Historic District, written notice to members of the Historic District Review Board (HRB) , Historic
Beaufort Foundation (HBF), and neighbors within 200 feet of the property will be required at least 15
days before any permit is issued.
9.1.6 DECISION BASED ON PUBLIC HEARING
A decision shall be made by the appropriate review body within 60 days of the close of the required public hearing.
9.1.7 WRITTEN NOTICE OF DECISIONS REQUIRED
Within 3010 calendar days after a final decision is made by any board under the requirements of this Code, a copy
of the written decision shall be sent to the applicant or appellant. A copy of the decision shall be filed in the office
of the Administrator, where it shall be available for public inspection during regular office hours.
9.1.8 TIME LIMITS FOR RESUBMISSION OF APPLICATIONS
In the event that any application required under this Code is denied or disapproved, an application for exactly the
same request shall not be refiled for one year from the advertised public hearing date. Where no public hearing is
required, time shall run from the date of mailing of the notice of denial. The Administrator, upon petition by the
applicant, may permit a refiling of said application after 6 months from the original public hearing date upon a
determination that:
A. Significant physical, economic, or land use changes have taken place on the subject tract or within the
immediate vicinity; or
B. A text amendment has been adopted that would allow for favorable review of a resubmitted
application for the subject property.
9.1.9 VESTED RIGHTS AND EXPIRATION OF APPROVALS
A. General: Approval of any application pursuant to this Code shall authorize only the particular use, plan,
or other specific activity for which the application was issued, and not any other approval requiring
separate application.
B. Vested Rights for Final Development Plans/Plats: A vested right is established for 2 years upon the
final approval of a development plan, plat, or phased development plan. An applicant shall have 2
years from final approval to receive a building permit or, if no building permit is required, to obtain a
certificate of compliance. Such vested right may receive up to five 1 -year extensions for good cause
upon written request by the landowner to the Administrator, no later than one month prior to
expiration, unless an amendment to this Code has been adopted that prohibits approval.
1. A vested right in a development plan, plat, or phased development plan shall not attach to the
property until all plans have been received and approved, and all fees have been paid in
accordance with this section.
2. A vested right is subject to revocation by the City Council after notice and public hearing that
there was a material misrepresentation by the landowner or substantial noncompliance with the
terms and conditions of the original or amended approval.
3. A vested plan is subject to later local governmental overlay zoning that imposes additional site
plan-related requirements, but does not affect allowable types, height as it affects density, or
intensity of uses.
Commented [CK4]: Rewrite as suggested by Kim McFann.
Commented [CK5]: Comment by Dianne Farrelly: “So, a
plan can be granted immunity from type, height and density
for many years (15) even if an amendment is codified?”
Created: 2023-12-08 08:25:14 [EST]
(Supp. No. 1)
Page 8 of 50
4. Phased development plans remain subject to review and approval of all phases prior to any
portion of the project being vested.
5. In the case of projects where more than 1 building is to be built, the applicant may submit a
series of Project Permit applications. The first application shall be submitted within 2 years from
the date the development plan approval is granted. Each sub sequent application shall be
submitted within 180 days from the date of issuance of a Certificate of Compliance or Certificate
of Occupancy for the previous building, whichever shall occur first. The lapse of more than 180
days shall cause the expiration of the development plan approval
C. Time Limitations For Other Types Of Approval:
1. All permits and approvals not referenced in Section 9.1.9 B., shall expire as shown in Section 9.1.2
(Permit/Process Type Table) without further action, unless the holder of the permit or approval
either submits a complete application for the appropriat e subsequent permit, approval, or
extension, or if no subsequent permit, approval, or extension is required, completes the work
described in the permit or approval within the timeframes established.
2. Upon written request, an extension of an approval may be granted by the decision -making body
for good cause for a period not to exceed that shown in Section 9.1.2 (Permit/Process Type
Table). No written request for an extension shall be considered unles s submitted to the
Administrator no later than one month prior to expiration. Failure to submit an application for an
extension within the time limits established by this section shall result in the approval's
expiration.
9.2: APPLICATION PROCEDURES
9.2.1 PRE-APPLICATION CONFERENCE
A. Mandatory Pre-application Conference: A pre-application conference with the Administrator shall be
required prior to filing an application for the following approvals:
1. Subdivision review involving the creation of new streets.
2. New construction, except for detached single -family homes not part of a new subdivision.
3. Map amendment (Rezoning).
4. Text amendment.
The Administrator shall have the authority to waive any mandatory pre -application conference where
such conference is deemed unnecessary.
B. Optional Pre-application Conference: Prior to the submission of any application required by this Code,
a potential applicant may request an optional pre -application conference to discuss procedures,
standards, or regulations required by this Code. Upon receipt of such request, the Administra tor shall
afford an opportunity for such a pre-application conference at the earliest reasonable time.
9.2.2 APPLICATION FORMS AND FEES
The following regulations shall apply to all applications.
A. Forms: Applications required under this Code shall be submitted on forms and in such numbers as
required by the city.
Created: 2023-12-08 08:25:14 [EST]
(Supp. No. 1)
Page 9 of 50
B. Fees:
1. Filing fees shall be established from time to time by resolution of the City Council to defray the
actual cost of processing the application.
2. All required fees shall be made payable to "The City of Beaufort."
3. An applicant who has paid an appropriate fee pursuant to the submission of an application, but
who chooses to withdraw such application prior to any review or action taken, may request in
writing a refund of 75% of the total amount paid.
C. Submittal Requirements:
See Chapter 7 for Minor and Major Subdivision Standards
9.2.3 APPLICATION DEADLINE
All applications shall be completed and submitted to the Administrator according to schedules as determined by
the city.
9.2.4 COMPLETE APPLICATION REQUIRED
A. The Administrator shall have 5 working days to review the application materials submitted and confirm
that all the required items have been submitted.
B. If the application is not complete, the Administrator shall inform the applicant in writing within the 5 -
day period, specifying the ways in which the application is incomplete, and the applicant shall have 60
days during which to provide the requested materials and complete the application. Any application for
which additional materials have not been forthcoming during this 60 -day period shall be considered
null and void. This application period may be extended by the Administrator upon mutual agreement
to provide the required materials at some date certain in the future.
9.2.5 3 CONCURRENT PROCESSING
Any applicant may submit an application for any sequential approvals (such as a zoning map amendment and site
plan approval) required under this Code and request that such sequential approvals be processed concurrently;
however, such concurrent processing shall proceed at the applicant's own risk, andrisk and shall have no
implication in regard to the approval of any of the various approvals requested.
- 9: DEVELOPMENT REVIEW PROCEDURES
9.3: APPLICATION REQUIREMENTS
Beaufort, South Carolina, The Beaufort Development Code Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 10 of 50
9.3: APPLICATION REQUIREMENTS
The following general standards for various applications are intended to require only that data/information that is necessary to render an informed decision by
the reviewing agency. A narrative explaining the scope of the project will be required for all applications. The "Application Submittal Requirements" list, on file
with the Administrator, is intended to provide further guidance to applicants as to the necessary level of detail for each ap plication component listed below.
PERMIT TYPE CODE
SECTION
PRE-APPLICATION
CONFERENCE
(7.5.4.B.4)
SKETCH
PLAN (7.5.3)
SITE PLAN – INCL.
BUILDING
ELEVATIONS
(7.5.7)
FINAL
PLAT
(7.5.5)
TRAFFIC
IMPACT
ANALYSIS
(7.3.2)
ARCHEOLOG.
IMPACT
ASSESSMENT
(8.4)
ADMINISTRATIVE PERMITS
Zoning Permit 9.4
See Administrator Project Permit 9.5
Certificate of Compliance 9.6
Certificate of Occupancy 9.7
DEVELOPMENT DESIGN REVIEWS
Minor Development 9.8.1 See Code Sec. 7.5: Subdivision and Site Plan Standards Major Development 9.8.2
SUBDIVISION REVIEWS
Subdivision, Minor (Site Plan)
9.9 See Code Sec. 7.5: Subdivision and Site Plan Standards
Subdivision, Major (Sketch
Plan)
Subdivision, Major (Site Plan)
Final Subdivision Plat
HISTORIC PRESERVATION
Certificate of Appropriateness
(CoA), Minor 9.10.2 (1) □ □
CoA, Major 9.10.2 (2) □ ■ ■ □
- 9: DEVELOPMENT REVIEW PROCEDURES
9.3: APPLICATION REQUIREMENTS
Beaufort, South Carolina, The Beaufort Development Code Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 11 of 50
PERMIT TYPE CODE
SECTION
PRE-
APPLICATION
CONFERENCE
(7.5.4.B.4)
SKETCH PLAN
(7.5.3)
SITE PLAN –
INCL.
BUILDING
ELEVATIONS
(7.5.7)
FINAL PLAT
(7.5.5)
TRAFFIC
IMPACT
ANALYSIS
(7.3.2)
ARCHEOLOG.
IMPACT
ASSESSMENT
(8.4)
ADMINISTRATIVE ADJUSTMENTS
Administrative Adjustment 9.12 See Administrator
Special Exception 9.13 ■ ■ □
Variance 9.14 ■ ■ □
APPEALS
Administrative Appeal 9.15 See Administrator
AMENDMENTS
Amendments & Rezonings 9.13 ■ ■ □
■ = Required Compliance □ = On an “as needed” basis as determined by the Administrator
- 9: DEVELOPMENT REVIEW PROCEDURES
9.3: APPLICATION REQUIREMENTS
Beaufort, South Carolina, The Beaufort Development Code Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 12 of 50
PERMIT/PROCESS
TYPE
SECTION PRE-
APPLICATION
CONFERENCE
(9.2.1)
SITE
ANALYSIS
(9.3.1.A)
SKETCH
PLAN
(9.3.1.B)
SITE PLAN
(9.3.1.C)
CONSTRUCTION
DOCUMENTS
(9.3.1.D)
AS-BUILT
DRAWINGS
(9.3.1.F)
FINAL
PLAT
(9.3.1.f)
BUILDING
ELEVATIONS
(9.3.1.G)
TRAFFIC
IMPACT
ANALYSIS
(7.3.2)
ARCHAEOLO
GICAL
IMPACT
ANALYSIS
(8.3)
ADMINISTRATIVE PERMITS
Zoning Permit 9.4 See Administrator
Project Permit 9.5 See Administrator
Certificate of
Compliance
9.4 See Administrator
Certificate of
Occupancy
9.6 See Administrator
DEVELOPMENT DESIGN REVIEW
Development
Design Review,
Minor
9.7 □
□ See Chapter 7
□
□
□
Development Design
Review, Major
9.7 ■
□
■ See Chapter 7
■
■
□
□
□
SUBDIVISION REVIEW
Subdivision, Minor,
Site Plan
9.8 ■
□ See Chapter 7
□
Subdivision, Major,
Sketch Plan
9.8 ■
■
- 9: DEVELOPMENT REVIEW PROCEDURES
9.3: APPLICATION REQUIREMENTS
Beaufort, South Carolina, The Beaufort Development Code Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 13 of 50
■
□ See Chapter 7
□
Subdivision, Major,
Site Plan Preliminary
Plat
9.8 ■
□ See Chapter 7
□
Final Subdivision Plat 9.8 ■
■ See Chapter 7
■
□
HISTORIC PRESERVATION
Certificate of
Appropriateness,
Minor
9.9 □ □ □ □
Certificate of
Appropriateness,
Major
9.9 □ ■ □ ■ ■ ■ □
Historic District
Designation
9.10 See Administrator
RELIEF
Administrative
Adjustment
9.11 See Administrator
Special Exception
Permit
9.12 □ ■ □ □
Variance Permit 9.13 ■ ■
ADMINISTRATION APPEALS
Administrative
Appeal
9.14 See Administrator
AMENDMENTS
Amendments 9.15 ■
■ = Required Compliance □ = On an "as needed" basis as determined by the Administrator
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 14 of 50
9.3.1 APPLICATION ELEMENTS
A. Site Analysis: A site analysis is intended to identify forest stands or trees of a
uniform size and species, specimen trees of varying sizes and species, particularly
free standing or open-grown or field grown trees, a distinctive tree line or forest
edge, existing watercourses and floodplains, previously documented federal- or
state-recognized endangered species habitats, and areas of historic, cultural, or
archeological significance. (See Section 8.3 as applicable.) This requirement provides
the city and the applicant the ability to evaluate the proposed development in order
to preserve existing resources and to improve the appearance of the development
proposed. It is the expectation that readily available spatial data, including GIS
information, will be sufficient for this survey.
B. Sketch Plan: The sketch plan shall show in simple line drawing form the proposed
layout of streets, lots, buildings, civic spaces, tree coverage, and other features in
relation to existing conditions, based upon the size of the tract proposed for
development. Sketch Plans shall be reviewed as binding documents for Certificates
of Compliance, and for any other permits or approvals for which the Administrator
requires only a Sketch Plan to be submitted with the application. Sketch Plans shall
be used for non-binding review for all other development application processes in
which they are required.
C. Site Plan (syn. Preliminary Plat): The site plan is intended to provide a detailed two-
dimensional drawing that illustrates all of the required site features, including
buildings*, parking areas*, street locations, street sections, rights-of-way, property
lines and setbacks, required or proposed Critical Area buffers, trees proposed to
remain and to be removed and tree protection zones, site landscaping and lighting*
(in conceptual form), and all related development calculations (e.g., density,
proposed building areas, number of parking spaces, estimated impervious surface,
proposed tree coverage, percentage of open space) in sufficient detail to show
compliance with this Code. When Specimen or Landmark Trees are proposed to be
preserved or removed, an Arborist Report is required per Section 5.3.2 B. Detailed
engineering drawings such as subsurface utilities (e.g., water and sewer) and
calculations for on-site stormwater facilities are not required for Site Plans. *When
a Site Plan is being used as a Preliminary Plat for a Subdivision, these elements are
not required to be shown.
Formatted: Section
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 15 of 50
D. Construction Documents: The construction documents for development design
review and subdivision plans shall constitute a full and complete set of engineered
drawings necessary for final permitting and horizontal and vertical construction.
This includes detailed landscaping plans, lighting plans, grading and drainage plans,
and stormwater calculations.
E. As-Built Drawings: The as-built drawings shall show the final installed conditions
and specifications for all public infrastructure. The designer of the infrastructure
shall certify, under seal, that the installed infrastructure is in compliance with the
approved plans and designs and with the requirements of this Code. A final
inspection and approval by the Administrator shall occur before the release of any
performance securities.
F. Final Plat: The final plat shall be prepared by a registered land surveyor licensed to
practice in the State of South Carolina, and shall meet the requirements of the
Beaufort County Register of Deeds Office. The Final Plat shall constitute an accurate
survey of the entire phase as shown on the approved site plan and shall include all
the relevant notes and certifications.
G. Building Elevations for Design Review: For certain applications, it may be necessary
to submit scaled drawings of each elevation visible from a public street or civic
space. These drawings shall be in color and shall accurately represent the building
heights, floor levels, and building materials, and shall include written identification
of building materials. In addition, the Administrator may require a physical model or
up to three drawings from different perspectives that show how the building fits
into the context of the block.
9.4: ZONING PERMIT
9.4.1 APPLICABILITY
Only Required Permit: A zoning permit certifying compliance with this Code shall be the only type of approval
required for the following activities:
A. Home Occupations as regulated by Section 3.4.3 (Home Occupations — Major and Minor).
B. Temporary uses that do not materially affect the area's natural environment, parking requirements,
transportation patterns, public health, or economic values. (See Section 3.11.3 Temporary Uses)
C. Conditional uses not requiring a building permit.
D. Special events.
E. Changes of use, and any uses permitted with additional standards per Article 3 (Land Use Provisions).
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 16 of 50
F. Removal of trees as regulated in Section 5.4 (Tree Removal).
9.4.2 PROCESS AND APPROVAL
A. Process Type: Administrative.
B. Pre-Application Procedure: None.
C. Required Application Information: See Administrator.
D. Public Notification: None.
E. Determination of Compliance: Once an application is deemed complete by the Administrator, the
Administrator shall review the application and approve or deny it based on compliance with the
standards contained in this Code.
F. Appeals: Appeals of zoning permit applications denied by the Administrator shall be taken to the
Zoning Board of Appeals within 30 days of the decision, in accordance with the procedures found in
Section 9.15 (Administrative Appeals).
G. Permit Validity: Upon the approval of the zoning permit, the applicant shall have 6 months to take
action on the approval. If no action is taken, the permit becomes null and void, and the applicant shall
resubmit.
1. Exception: Tree Removal Permits have no expiration.
H. Permit Extension: The Administrator may grant a single extension of up to 6 months upon submittal by
the applicant of sufficient justification for the extension. Permits issued for temporary uses may be
renewed only if it is determined that said use is clearly of a tempora ry nature, will cause no traffic
congestion, and would not create a nuisance to surrounding uses.
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 17 of 50
9.5: PROJECT PERMIT
9.5.1 APPLICABILITY
A Project Permit shall be required for any building, structure, or attachment to a structure to be erected, moved,
added to, or structurally altered. This includes, but is not limited to:
A. Site Work: Any modifications to a parcel of land, not to include construction of a structure.
B. New Construction and Expansion:
1. Primary Building(s): New construction of all types of structures.
2. Accessory Structures or Uses: Accessory uses incidental to single-family residential structures
(e.g., detached garage, swimming pool, tool shed) as regulated by Section 3. 12 11 (Accessory
Uses and Structures).
3. Building Expansions: Heated and unheated (e.g., porches, decks, sunrooms) building expansions.
4. Site Elements: Any site elements not attached to the building (e.g., porches, patios).
C. Signs: Erection of new signs or modification to existing signs, including Master Sign Plans.
D. Awnings: Includes new awnings and awning re -covers.
E. Fences and Enclosures: Erection of, demolition of, or any changes to fences and other types of
enclosures.
F. Demolition: Removal of existing buildings, structures, or site work.
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 18 of 50
9.5.2 PROCESS AND APPROVAL
A. Process Type: Administrative.
B. Pre-Application Procedure: For large-scale projects, a pre-construction meeting may be required. For
all other projects, no meeting is required, but applicants are encouraged to call or visit the
Administrator prior to requesting a Project Permit to determine what information is re quired for the
application.
C. Required Application Information: See Administrator. The application shall include all drawings and
specifications required by building codes adopted by S.C. Code § 6 -9-50.
D. Determination of Conformity: The review, approval, and distribution of drawings and specifications
required shall be coordinated by the Administrator in accordance with the building codes adopted by
SCCL Section 6-9-50. Upon issuance of a permit, the Administrator shall endorse, by w riting or stamp,
all sets of drawings showing approval. Such drawings shall be kept at the work site and made available
for inspection by the Administrator upon request. Approved Project Permits shall be conspicuously
posted by the applicant on the property for which they were obtained until the applicant has obtained
a Certificate of Occupancy, pursuant to Section 9.7.
E. Public Notification: None required.
F. Appeals: Appeals of Project Permit applications denied by the Administrator that are not reviewed by
the Building codes department, shall be taken to the Zoning Board of Appeals (Section 10.3). The
appeal of any Project Permit application requiring approval by the Building codes department shall be
taken to the Building Board of Appeals within 30 days of the decision, in accordance with the
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 19 of 50
procedures found in the City Code of Ordinances, Section 5 -1005.1 (or appropriate section as amended
from time to time).
G. Changes to Approved Plans: If a project has undergone design review and received Design Approval or
Certificate of Appropriateness, as applicable, no changes between the design review set and the
building permit set shall be permitted unless they are presented in writing and approv ed by the
Administrator at the time a Project Permit is sought. If the Administrator is not made aware of any
changes, the plans submitted for design review will take precedence.
H. Changes to Approved Permits:
1. After a Project Permit has been issued, no changes or deviations from the terms of the permit or
the application and accompanying plans shall be made without the specific written approval of
such changes or deviations by the Administrator. Any exterior changes may require review and
approval by the appropriate decision-making body.
2. An amendment to a Project Permit that requires payment of an additional fee, either because of
an increase in the size of the buildings, a change in the scope of work, or an increase in the
estimated cost of the proposed work, shall not be approved unti l the applicant has paid the
additional fees, and the amendment has been properly reviewed by the appropriate decision -
making body.
I. Notification and Approval Before Construction Begins:
1. Before any work begins pursuant to the Project Permit, the applicant shall furnish the
Administrator with the name of the general contractors, or the owner acting as the general
contractor, who will be performing the work;
2. The applicant or the applicant's authorized agent shall provide adequate advance notice to the
Administrator at such time as the work is ready for inspection under the Building code. Upon
receiving such notification, the Administrator shall inspect the work.
J. Licensed Specialty Contractor(s) May Be Required: Where any local ordinances or any provision of the
SCCL require that work be done by a licensed specialty contractor of any kind, no Project Permit for
such work shall be issued unless it is to be performed by such licensed specialty contractor. It shall
further be the contractor's responsibility to conform to all local ordinances and state building codes for
all installations or repairs of a building or utility system.
K. Permit Validity: Any Project Permit shall become null and void unless the work approved by the permit
is commenced within 180 days after the date of issuance. No work shall be considered to have
commenced for the purposes of this paragraph until an inspection has been mad e and recorded. If
after commencement the work is discontinued for a period of 180 days, the permit shall immediately
expire. Extensions of up to 180 days per request may be granted by the Administrator, but shall be
requested in writing prior to expiration of the permit. No work authorized by any permit that has
expired shall thereafter be performed until a new permit has been secured.
L. Permit Extension: None - shall resubmit.
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 20 of 50
9.6: CERTIFICATE OF COMPLIANCE
9.6.1 APPLICABILITY
A Certificate of Compliance shall be required as part of a final site inspection for development work completed
subsequent to a previously approved subdivision or site plan. It may also be required for a change in occupancy or
use of an existing building to a conforming use.
9.6.2 PROCESS AND APPROVAL
A. Process Type: Administrative.
B. Pre-Application Procedure: n/a.
C. Required Information: Upon completion of all development work and simultaneous with the
applicant's request to the Administrator for a final site inspection, the applicant shall submit the
following documents to the Administrator for review and approval.
1. A registered engineer's sealed certification of completed roads, parking, drainage systems and
utilities.
2. Certification of Compliance with approved landscaping and tree planting plan by a registered
landscape architect or a landscape contractor.
3. A digital file of the as-built drawings, indicating accurate site conditions of pavements, parking
spaces, utilities, structures, and drainage — this may be submitted after the Certificate of
Compliance and Certificate of Occupancy (Section 9.7) are iss ued.
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 21 of 50
4. South Carolina Department of Health and Environmental Control permits to operate water and
sewer system.
5. City agreement to accept ownership and maintenance responsibility for dedicated roads and
drainage systems where applicable.
6. Other applicable agencies' final certification..
7. An owner's affidavit stating that all work has been completed consistent with the applicant's
development permit and any applicable provisions of this chapter, plus a copy of the documents
that clearly set forth the ownership and maintenance provisions and responsibilities for
infrastructure improvements.
D. Public Notification: None.
E. Issuance of a Certificate of Compliance: Upon determination of compliance, the Administrator shall
complete a Certificate of Compliance and forward it to the applicant. A final Certificate of Occupancy
(Section 9.7) shall not be issued by the Administrator until a Certificate of Compliance has b een issued,
in accordance with the provisions of this section, for the site or phase thereof in which the building is
located. The Administrator's approval of the Certificate of Occupancy may be accepted as Certificate of
Compliance, unless a separate Certificate of Compliance has specifically been requested by the
applicant.
F. Appeals: Appeals of Certificate of Compliance applications denied by the Administrator shall be taken
to the Zoning Board of Appeals within 30 days of the decision, in accordance with the procedures
found in Section 9.15 (Administrative Appeals).
G. Permit Validity: n/a.
H. Permit Extension: n/a.
9.7: CERTIFICATE OF OCCUPANCY
9.7.1 APPLICABILITY
A Certificate of Occupancy shall be required for occupancy and use of a building that is erected or enlarged.
9.7.2 PROCESS AND APPROVAL
A. Process Type: Administrative.
B. Pre-Application Procedure: n/a.
C. Required Application Information: See Administrator.
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 22 of 50
D. Public Notification: None.
E. Issuance of Certificate of Occupancy: A final Certificate of Occupancy shall not be issued by the
Administrator until a Certificate of Compliance (9.6) has been issued for the site or phase thereof in
which the building is located and all outstanding building code issues have been satisfied.
F. Temporary Certificate of Occupancy: Pending the issuance of a permanent Certificate of Occupancy, a
temporary certificate may be issued. The certificate shall be issued by the Administrator in conformity
with the provisions of this Code and the building code. The temporary certificate may i nclude such
safeguards and conditions as will protect the safety of the occupants and the public. Where
improvements required by this Code or the specific approval of the development are incomplete, a
guarantee acceptable to the City — equal to 125% of the costs of such improvements — may be
required to ensure the installation of the improvements.
G. Appeals: Appeals of Certificate of Occupancy applications denied by the Administrator shall be taken to
the Zoning Board of Appeals within 30 days of the decision, in accordance with the procedures found in
Section 9.15 (Administrative Appeals).
H. Permit Validity: n/a.
I. Permit Extension: n/a.
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 23 of 50
9.8: DEVELOPMENT DESIGN REVIEW
9.8.1 DEVELOPMENT DESIGN REVIEW (MINOR)
A. Applicability:
1. All structures having a 10,000 square foot or less building footprint, except Vehicle-Related Uses
as defined in Section 9.8.2 A.2.
1. 2. All buildings, except single-family residential structures, in developments that contain
245 or fewer residential units.
2. 3. Demolition of structures of any size where no new building is proposed.
3. 4. Improvements to existing non-residential or multi-family structures that do not exceed
750% of the assessed value of the existing improvements.
B. Exceptions:
1. Detached single-family homes on individual lots outside of the Historic District are not subject to
Development Design Review. However, they may be subject to the Building Design Standards laid
out in Article 4, depending on the zoning district.
2. Projects in the Beaufort Historic District are not subject to Development Design Review , and shall
instead be evaluated by the HRB for compliance with the Historic District Guidelines. (See Section
9.10.2 - Certificate of Appropriateness, Minor and Major.)
3. Projects in the LI Zone are not subject to Development Design Review. However , they are subject
to the Building Design Standards described in 4.2.2.B.3.
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 24 of 50
C. Process Type: Administrative — The Administrator may submit any applications subject to staff
approval to the Design Review BoardPlanning Commission for approval.
D. Pre-Application Procedure: No meeting is required, but applicants are encouraged to call or visit the
Administrator to determine what information is required for the application.
E. Required Application Information: Site Analysis (Section 9.3.1), Site Plan (Section 9.3.3) and Building
Elevations for Design Review (Section 9.3.7) — these may be waived by Administrator as appropriate.
F. Public Notification: None.
G. Determination of Compliance: Once an application is deemed complete by the Administrator, the
Administrator shall review the application and approve, deny, or approve the plan with conditions
based on compliance with the standards contained in this Code. All decisions shall be in wri ting.
Following an approval or approval with conditions, the applicant shall be directed to prepare detailed
Construction Documents (Section 9.3.1 D.) for final approval by the Administrator.
H. Appeals: Appeals of the decisions of the Administrator shall be heard by the Design Review Board
Planning Commission. Application for appeal shall be made within 30 days of the decision.
I. Permit Validity: Upon the approval of the Minor Development Design application, the applicant shall
have 2 years to obtain a Project Permit. Failure to secure Project Permits for the permitted work within
this time shall render the compliance void. Any change to the appro ved plans that has not been
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 25 of 50
authorized by the Administrator shall invalidate the Minor Development Design Plan and any
subsequent Project Permits.
J. Permit Extension: The Administrator may grant up to 5three one-year extensions of this time period
upon submittal by the applicant of sufficient justification for the extension. Extensions shall be
submitted at least 1 month prior to the expiration date.
9.8.2 DEVELOPMENT DESIGN REVIEW (MAJOR SITE PLAN)
A. Applicability:
1. Civic and Educational Facilities: Any new development classified as a Civic Facility or Educational
Facility (see Sections 3.4.1 A. and 3.4.1 C.).
2. Vehicle-Related Uses: Any new development that includes fuel-dispensing facilities, drive-thru
facilities, or structured parking.
3. Nonresidential Development: Any commercial development.
4. Residential Development: Single-family attached or multi-family developments containing more
than 610 units.
5. Exceptions:
a. Lots in the Beaufort Historic District are not subject to Development Design Review, and
shall instead be evaluated by the HRB for compliance with the Historic District Guidelines
(see Section 9.10 Certificate of Appropriateness, Minor and Major).
b. Projects in Redevelopment District Overlay Districts, are not subject to review by the
Planning Commission and shall instead be evaluated by the Administrator (see Section
2.7.3). The Administrator shall post all projects for review in said districts fo r a 15-day
public review and comment period for each major submittal. Minor revisions to the plans
(not related to use, density, building frontage, or building height) shall not constitute a
major submittal. A copy of all public comments shall be dissemina ted to the applicant and
Administrator for each public comment period. The Administrator shall respond in writing
to all public comments after each major submittal, and the project will be required to
attend a TRC committee meeting before the project is is sued final approval.
Commented [CK6]: Comment from Dianne Farrelly:
“Suggest referring to chart for relevant extension periods,
however, what about if amendments are codified in the
meantime?”
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 26 of 50
B. Process TypeType, Requirements and Approval: See Section 7.5.8 for standards and requirements.
Discretionary.
C. Pre-Application Procedure: Every applicant for a Major Development Plan is required to meet with the
Administrator prior to the submittal of an application. The purpose of this meeting is to provide
clarification and assistance in the preparation and submission of plat for approval . It is recommended
that the applicant provide a Sketch Plan (Section 9.3.1 B.) to the Administrator prior to or at the pre -
application conference. The provision of a sketch plan will allow the Administrator an opportunity to
review the proposal before the applicant expends funds on the preparation of a detailed Site Plan.
D. Required Application Information: Site Analysis (Section 9.3.1 A.), Sketch Plan (Section 9.3.1 B.), Site
Plan (Section 9.3.1 C.), Construction Documents (Section 9.3.1 D.), As -Built Drawings (Section 9.3.1 E.),
Building Elevations for Design Review (Section 9.3.1 G.) —a Traffic Impact Analysis (Section 7.3.3)
and/or Archeological Impact Analysis (Section 8.3) may also be necessary as determined by the
Administrator.
E. Determination of Completeness: The Administrator shall review the application to ensure that it is
complete, prepare a report and recommendation on the application, and schedule the matter for a
public review before the Design Review Board.
F. Public Notification: None.
G. Neighborhood Meeting: Optional.
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 27 of 50
H. Public Meeting: The Planning Commission shall hold a public meeting on the proposal. The applicant
and other property owners likely to be materially affected by the application shall be given an
opportunity to be heard.
I. Decisions/Findings of Fact: Following the public meeting, the Planning Commission may approve,
deny, or approve with conditions the application for a Major Development. No Major Development
shall be approved unless the following findings of fact can be made:
1. The plan is consistent with the adopted plans and policies of the City.
2. The plan complies with all applicable requirements of this Code.
3. There exists adequate infrastructure (transportation and utilities) to support the plan as proposed.
4. The proposed plan conforms to the character of the neighborhood, considering the location, type and
height of buildings or structures and the type and extent of landscaping on the site.
5. The proposed plan conforms to the Building Design Standards in Article 4.
6. The application will not substantially lessen the value of adjoining or abutting property, and will not be
detrimental to the use or development of adjacent properties or other neighborhood uses.
J. Time Frame for Review: Major Development Design applications shall be acted upon within 90 days
after filing; otherwise, the application shall be deemed approved, and a permit shall be issued. An
extension of time may be granted by mutual consent of the Planning Commission and the applicant.
Following approval, or approval with conditions, the applicant shall be directed to prepare detailed
Construction Documents (Section 9.3.1 D.) for final approval by the Administrator and the TRC (as
necessary).
K. Appeals: Any party aggrieved by the decisions of the Planning Commission may appeal to the Circuit
Court of Beaufort County within 30 days of the decision.
L. Permit Validity: Upon the approval of the Major Development Design application, the applicant shall
have 2 years to obtain a Project Permit. Failure to secure a permit for the permitted work within this
time shall render the compliance void. Any change to the approved pla ns that has not been authorized
by the Administrator shall invalidate the design approval, and any subsequent building permits.
M. Permit Extension: The Administrator may grant up to 5 one-year extensions of this time period upon
submittal by the applicant of sufficient justification for the extension. Extensions shall be submitted at
least 1 month prior to the expiration date.
(Ord. No. O-14-23 , 9-26-2023)
Formatted: List 2
Formatted: List 2
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 28 of 50
9.9: SUBDIVISION REVIEW
9.9.1 PROVISIONS FOR ALL SUBDIVISIONS
A. Applicability and Requirements: See Article 7 of this code All development that involves the
subdivision of one or more parcels shall be subject to the subdivision approval requirements of this
division, with the following exceptions:
1. The division of land into parcels of 5 acres or more where no new street is involved.
2. Subdivision of land into parcels of less than 5,000 square feet in area when they are exclusively for the
provision of local utilities such as pump stations.
3. The combination or recombination of entire lots of record where no new street or change to existing
streets is involved.
Land Development Standards: See Article 7 of this code.
CB. Unlawful to Record Plat without City Approval: It shall be unlawful to offer and cause to be recorded
any plan, plat, or replat of land within the city limits of Beaufort with the Beaufort County Register of
Deeds office unless the same bears the endorsement and approval of the city.
CD. Appeals:
1. Subdivision Plat decisions made by the Metropolitan Planning Commission (MPC) may be
appealed to the circuit court within 30 days of the decision.
2. Subdivision Plat decisions made by the TRC may be appealed to the MPC within 30 days of the
decision. The MPC shall review the Subdivision Plat within 60 days and shall have all of the same
authority as the TRC in such review. The decision of the MPC sha ll be final.
ED. Permit Validity: A subdivision approval shall expire as set out in Section 9.1.9 (Vested Rights and
Expiration of Approvals) of this Code unless a Certificate of Compliance is obtained, or it is recorded at
the Beaufort County Register of Deeds office.
Formatted: List 2
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 29 of 50
9.9.2 MINOR SUBDIVISION
A. Applicability: The Minor Subdivision review process is allowed for those divisions of
land that:
1. Combine or recombine portions of previously platted lots where the total number
of lots is not increased and the resultant lots are equal to the standards of this
Code. A nonconforming lot may be included in a lot recombination if the resultant
lot becomes closer to conformity.
2. Subdivide parcels less than 10 acres in size.
3. Create no new streets.
4. Do not involve any other conditions that require any additional approval(s) from
any city board or commission, as determined by the Administrator.
B. Process Type: Administrative.
C. Required Application Information: A Minor Subdivision plat shall be submitted
consistent with the requirements of the city.
D. Exceptions:
Formatted: Section
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 30 of 50
1. Any development that utilizes the Small-Scale Planned Infill Standards (Section
2.8.1) or the Cottage Court Standards (Section 2.8.2) may divide land into 10 or
fewer lots and be reviewed as a minor subdivision.
2. A rear lane, accessed off of a separate, platted street, which provides access to the
rear of a lot, will not be considered a "new street" for the purposes of this section.
3. The subdivision of any property listed on the original 1969 National Historic
Landmark District nomination is not permitted. Variance requests for this provision
may be made per Section 9.14.
9.9.3 MAJOR SUBDIVISION—SKETCH PLAN AND SITE PLAN
A. Applicability: Any division of land that does not meet all of the requirements for Minor Subdivisions
(Section 9.9.2 A.).
B. Process Type: Discretionary.
C. Required Application Information: Site Plan (syn. Preliminary Plat - Section 9.3.1 C.).
D. Public Notification: Level 2 for Sketch Plan Review.
E. Sketch Plan Review:
Created: 2023-12-08 08:25:15 [EST]
(Supp. No. 1)
Page 31 of 50
1. Procedure: The subdivider shall submit to the Administrator, not less than the requisite number
of days prior to the regularly scheduled meeting date of the MPC, the required number of copies
of the Sketch Plan. Additional copies of the plat or any supplemental info rmation may be
requested.
2. Review by Technical Review Committee: The Sketch Plan shall then be submitted to and checked
by the TRC for conformance with the requirements of this Code. The TRC shall review the plat
within 30 days after submissions. The TRC shall either approve and certify the plat, or notify the
subdivider in writing of any noncompliance with the regulations of this Code.
3. Review and Action by Metropolitan Planning Commission:
a. The MPC shall approve, approve with conditions, or disapprove the Sketch Plan within 60
days after submission. Unless this time limit is extended by mutual agreement, failing to act
within the time limit constitutes approval of the Sketch Plan. If a propos ed Site Plan is
determined by the MPC to be in conformance with all applicable provisions of this Code,
the MPC shall approve the Site Plan, and shall advise the applicant in writing of:
i. The conditions of such approval, if any;
ii. Certification of the plan by the City; and
iii. The date on which the MPC granted approval.
b. A determination by the MPC that all applicable provisions have not been satisfied shall
result in disapproval of the Site Plan and notice of such disapproval shall be given to the
applicant in writing.
c. Approval of a Sketch Plan shall not constitute approval of the Site Plan or Final Subdivision
Plat. Application for approval of the Site Plan (Preliminary Plat) and Final (Record) Plat will
be considered only after the requirements for each approval as specified herein have been
fulfilled and after all other specified conditions have been met.
d. Upon approval of the Sketch Plan by the MPC, the subdivider may proceed to comply with
the other requirements of these regulations and the preparation of the Site Plan and then
Final Subdivision Plat.
4. Approved Plans Containing School Sites: Where a tract of land that has been approved by the
County Board of Education as a proposed school site lies wholly or partially within an area
proposed to be subdivided, and provided the Board of Education has notified the city and the
property owner of its approval of the proposed school site prior to or within 10 days after the
presentation of a Site Plan to the TRC for approval, the subdivider shall reserve the proposed
school site for a period of not more than 60 days from the date of approval of the Site Plan. Such
reservation would be stated as a condition of preliminary approval by the TRC.
F. Site Plan Review:
1. Procedure: The subdivider shall submit the Site Plan (syn. Preliminary Plat, Section 9.3.1 C.) to
the Administrator. The Site Plan shall be in coformance with the approved Sketch Plan, including
any conditions required by the MPC.
2. Review by Technical Review Committee: The Site Plan shall then be submitted to and checked
by the TRC for conformance with the requirements of this Code. The TRC shall review the Site
Plan within 30 days after submissions. The TRC shall either approve and certify the plat, or notify
the subdivider in writing of any noncompliance with the regulations of this Code.
Created: 2023-12-0
Text truncated. Open the original for the full document.
Source: City of Beaufort website. First collected Nov 14, 2026.