RecordWell Data

US 278 County Council Workshop — Agenda Packet

Beaufort County · Beaufort County · County Council Meeting · meeting of Feb 3, 2025 · Agenda packets

Open the original document More from Beaufort County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

US 278 County Council Workshop Beaufort County, SC Executive Conference Room, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort Monday, February 03, 2025 2:00 PM AGENDA COUNCIL MEMBERS: ALICE HOWARD, CHAIR ANNA MARIA TABERNIK, VICE-CHAIR DAVID P. BARTHOLOMEW PAULA BROWN LOGAN CUNNINGHAM GERALD DAWSON YORK GLOVER MARK LAWSON LAWRENCE MCELYNN JOSEPH PASSIMENT THOMAS REITZ 1. CALL TO ORDER: Alice Howard, Chair 2. PLEDGE OF ALLEGIANCE : Alice Howard, Chair 3. STATEMENT OF COMPLIANCE WITH FOIA: Alice Howard, Chair 4. APPROVAL OF AGENDA 5. PUBLIC COMMENT PERIOD 6. US 278 CORRIDOR PROJECT STATUS 7. ADJOURNMENT TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND BACKUP PACKAGES, PLEASE VISIT: https://beaufortcountysc.gov/council/council-committee-meetings/index.html 1 2 Item 5. 3-lane Bridge (capable of accommodating 4 th lane) with using portion of Westbound bridge for o island and one of the old Skull Creek for access to Pinckney Island Retain existing 2 -lane Westbound traic as -is Remove eastbound Mackay Creek Bridge Retain existing 2 -lane Westbound traic as -is Retain eastbound Skull Creek Bridge to allow for 2-way traic to and from Pinckney Island Build new 3 -lane “lifeline” bridge over Mackay, Pinckney and Skull Creek (capable of carrying 4-lanes (two-lanes in each direction) temporarily) Build new Hogg Island connector required for “lifeline” bridge connection to existing US 278 3 Item 6. 3-lane roadway from Moss Creek to Spanish Wells – lifeline bridge (3-lanes with accommodations for 4th lane) 4 Item 6. TRAFFIC PATTERN ON NEW BRIDGE CONSTRUCTION - TYPICAL SECTION WITHOUT SHARED-USE PATH TRAFFIC PATTERN ON NEW BRIDGE CONSTRUCTION - TYPICAL SECTION WITH SHARED-USE PATH EXISTING WESTBOUND MACKAY CREEK BRIDGE - TYPICAL SECTION OPTION 2 & 4 OPTION 1 & 3 KCI TECHNOLOGIES 3014 SOUTHCROSS BOULEVARD, ROCK HILL, SC 29730 22'-0" 34'-0" (T Y P .) 3 '-6 " 0.02 ft/ft 0.02 ft/ft 1'-0" MASH BARRIER US 278 EASTBOUND 58'-3" (OUT-TO-OUT ) SHOULDER 10'-0" LANE 12'-0" LANE 12'-0" LANE 12'-0" SHOULDER 10'-0" FINISHED GRADE "2 1 1 SLIPFORM EDGE (TYP.) GUTTERLINEGUTTERLINE � RELOCATED US 278 EASTBOUND 22'-0" 34'-0" (T Y P .) 3 '-6 " 0.02 ft/ft 0.02 ft/ft 1'-0" MASH BARRIER US 278 EASTBOUND 73'-3" (OUT-TO-OUT ) SHOULDER 10'-0" LANE 12'-0" LANE 12'-0" LANE 12'-0" SHOULDER 10'-0" FINISHED GRADE "2 1 1 SLIPFORM EDGE (TYP.) GUTTERLINEGUTTERLINE � RELOCATED US 278 EASTBOUND 19'-8" US 278 WESTBOUND 39'-4" (OUT-TO-OUT) 19'-8" 1'-8" 1'-8" LANE 12'-0" SHOULDER 6'-0" LANE 12'-0" SHOULDER 6'-0" SHARED-USE PATH 14'-0" #### SHEET -B01030450P BRIDGE PLANS ID QUAN. DR. DATECHK.BY REVIEWED DES. REV. REV. DATECHK.BY REV. DESCRIPTION OF REVISION Adam.Lansing 1/8/2025 9:22:38 AM US 278 Alt Typical Sections.dgn BEAUFORTCOUNTY: US 278ROUTE: DEPARTMENT OF TRANSPORTATION SOUTH CAROLINA MACKAY CREEK TRAFFIC PATTERN OVER JCM R I IF ETAC T R E C UAFO OHT ZI N O ITA NO S HTU RAC ILO A NO. 651 KCI TECHNOLOGIES INC. 5 Item 6. ALTERNATE TRAFFIC PATTERN ON EXISTING SKULL CREEK BRIDGE - TYPICAL SECTION TRAFFIC PATTERN ON NEW BRIDGE CONSTRUCTION - TYPICAL SECTION WITH SHARED-USE PATH TRAFFIC PATTERN ON NEW BRIDGE CONSTRUCTION - TYPICAL SECTION WITHOUT SHARED-USE PATH OPTION 2 & 4 OPTION 1 & 3 KCI TECHNOLOGIES 3014 SOUTHCROSS BOULEVARD, ROCK HILL, SC 29730 22'-0" 34'-0" (T Y P .) 3 '-6 " 0.02 ft/ft 0.02 ft/ft 1'-0" MASH BARRIER US 278 EASTBOUND 58'-3" (OUT-TO-OUT) SHOULDER 10'-0" LANE 12'-0" LANE 12'-0" LANE 12'-0" SHOULDER 10'-0" FINISHED GRADE "2 1 1 SLIPFORM EDGE (TYP.) GUTTERLINEGUTTERLINE � RELOCATED US 278 EASTBOUND 19'-8" 19'-8" 19'-8" 19'-8" LANE 12'-0" SHOULDER 6'-0" LANE 12'-0" SHOULDER 6'-0" LANE 12'-0" SHOULDER 6'-0" LANE 12'-0" SHOULDER 6'-0" 1'-8" 1'-8" US 278 WESTBOUND 39'-4" (OUT-TO-OUT) PINCKNEY ISLAND ACCESS (CURRENT US 278 EASTBOUND) 39'-4" (OUT-TO-OUT) 22'-0" 34'-0" (T Y P .) 3 '-6 " 0.02 ft/ft 0.02 ft/ft 1'-0" MASH BARRIER US 278 EASTBOUND 73'-3" (OUT-TO-OUT ) SHOULDER 10'-0" LANE 12'-0" LANE 12'-0" LANE 12'-0" SHOULDER 10'-0" FINISHED GRADE "2 1 1 GUTTERLINEGUTTERLINE � RELOCATED US 278 EASTBOUND SHARED-USE PATH 14'-0" 1'-0" #### SHEET B02-030450P BRIDGE PLANS ID QUAN. DR. DATECHK.BY REVIEWED DES. REV. REV. DATECHK.BY REV. DESCRIPTION OF REVISION Adam.Lansing 1/8/2025 9:22:38 AM US 278 Alt Typical Sections.dgn BEAUFORTCOUNTY: US 278ROUTE: DEPARTMENT OF TRANSPORTATION SOUTH CAROLINA SKULL CREEK TRAFFIC PATTERN OVER JCM R I IF ETAC T R E C UAFO OHT ZI N O ITA NO S HTU RAC ILO A NO. 651 KCI TECHNOLOGIES INC. 6 Item 6. 0.025 FT/FT0.020 FT/FT0.020 FT/FT 12'12' 16' 12' 11' 11' 11' 12'2'2' 5'10' 15' 12' 12' 12' 12' 12' 12'5'10'2' 0.020 FT/FT 0.020 FT/FT 2:1 4:1 4:1 2:1 8% 8% 2' PLANS PREPARED BY: TYPICAL SECTION PAVEMENT DESIGN TO STA.CLASSIFICATION FUNCTIONAL NO. 03_Typical_Section MPH FROM STA. DESIGN SPEED NO. SHEETPROJECT ID NO.COUNTYSTATEDIV. NO. FED. RD. 3 S.C. COLUMBIA, S.C. SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION TYPICAL SECTION OF IMPROVEMENT SCALE 1"H =SCALE 1"V = COLUMBIA, S.C. DEPARTMENT OF TRANSPORTATION SOUTH CAROLINA NTS NTS TYPICAL ROUTE BEAUFORT US 278 3P030450 NOT FOR CONSTRUCTION RIGHT-OF-WAY PLANS R/W EX. R/W EX. 100'R/W NEW R/W EX. (40' SHOWN) VARIES 40'-55'R/W EX. L LRELOC. C EXIST. US 278 C LEXIST. US 278 C (40' SHOWN) VARIES 40'-55'R/W NEW 20' R/W EX. R/W EX. R/W NEW (55' SHOWN) VARIES 55'-70' (55' SHOWN) VARIES 55'-66' 8' LEXIST. US 278 C 2' 2'12' 50' 12'12'2'8'4'2'10' 14' 2' 0.020 FT/FT 4:1 2:1 6:1 8% 0.020 FT/FT 0.020 FT/FT TYPICAL SECTION BETWEEN SQUIRE POPE & SPANISH WELLS - OPTION 4 TYPICAL SECTION IN STONEY COMMUNITY - OPTION 4 TYPICAL SECTION ON JENKINS ISLAND - OPTION 4 STILL IMPACTS PRESENT R/W NOTE: EB 3-LANE SECTION RTE./RD. 7 Item 6. Options: Bridge Roadway R/W Mitigation Utility Subtotal CEI Total 1. Lifeline option w/o MUP (roadway only to tie in) 185.0 14.7 1.5 9.8 23.3 234.3 23.4 257.7 2. Lifefline option w/ MUP (roadway only to tie in) 240.0 15.7 1.5 9.8 23.3 290.3 29.0 319.3 3. Lifeline option w/o MUP (roadway w/ 3-Lane EB from Moss Creek to Spanish Wells) 185.0 22.8 2.9 11.2 26.9 248.8 24.9 273.7 4. Lifeline option w/ MUP (roadway w/ 3-lane EB from Moss Creek to Spanish Wells) 240.0 24.4 4.0 12.6 28.8 309.8 31.0 340.8 5. 2024 anticipated cost for full project 331.3 43.8 5.8 14.0 29.5 424.4 42.4 466.8 6. Replace only Mackay EB Bridge 45.0 14.7 0.8 7.5 12.5 80.5 8.1 88.6 8 Item 6. Here’s a summary of the information as well as answers obtained from the SCDOT meeting held on January 30, 2025, at 2:00 pm in Columbia, South Carolina: Attendees: Meeting Attendees: • SCDOT:  Justin Powell, Secretary of Transportation  Rob Perry, PE, Deputy Secretary for Engineering  John Boylston, Chief Engineer for Program Delivery  Maggie Hendry, Chief Administrative Officer  Craig Winn, PE, Lowcountry Program Manager • Town of Hilton Head Island:  Alan Perry, Mayor  Alex Brown, Councilman  Steve Desimone, Councilman  Marc Orlando, Town Manager  Shawn Colin, Assistant Town Manager • Beaufort County:  Alice Howard, County Council Chair  Tab Tabernik, County Council  Michael Moore, Administrator  Jared Fralix, Assistant Administrator 1 . Bridge/Project Options Overview: • Option 1: $257.7M – Lifeline option without multiuse pathway. Includes a 3-lane bridge with breakdown lanes. The bridge would be stripped for two-lanes. Cost Comparison: The costs of half the project may not necessarily be half the total cost. • Option 2: $319.3M – Lifeline option with multiuse pathway. Includes a 3-lane bridge with b reakdown lanes and a protected multiuse pathway. • Option 3: $273.7M – Lifeline option without multiuse pathway. Includes 3 lanes eastbound from Moss Creek to Spanish Wells Road. • Option 4: $340.8M – Lifeline option with multiuse pathway. Includes 3 lanes eastbound from Moss Creek to Spanish Wells Road, a protected multiuse pathway on the bridge, and a pathway connection to Moss Creek and Jenkins Island. • Option 5: $466.8M – Full project cost anticipated for 2024. • Option 6: $88.6M – Replacement of only the MacKay Creek eastbound bridge. o Option 3 or 4 may take longer to move through the process and construction p hases. o Projects beyond the bridge scope may be included in the Lowcountry Area Transportation Study for programming and funding considerations. 9 Item 6. 2. SCDOT is considering a Design Build approach to the project to help with pricing. • A design-build option will consider design alternatives, including bike and pedestrian connections. • SCDOT has seen a 70 percent project cost escalation over the past few years. 3. Tolls and Reversible Lanes: • Tolls: Tolls are prohibited on existing free facilities (as per South Carolina Statute). o Tolls for express routes (e.g., to Cross Island Parkway) would require extended evaluation, including a toll study, environmental review, and permitting. • Reversible Lanes: SCDOT opposes reversible lanes due to safety, compliance issues, and the high cost of operation and maintenance. SCDOT is not in the business of reversible lanes. 4. Utility Relocation and Funding: Utility relocation costs are part of the project; SCDOT will pay per South Carolina code Act 36. SCDOT will cover utility relocation costs in accordance with the Utility Relocation Act, and additional funding could come from local funds 5. Pinckney Island/Skull Creek Bridges: The preference is for a new eastbound bridge to be elevated over Pinckney Island. Touching down on Pinckney Island would increase costs, and reduce safety by having at grade movements. 6. Skull Creek Bridge Substructure: • The existing substructure supports both the eastbound and westbound bridge decks. The eastbound deck must be kept if the westbound deck remains. The existing eastbound bridge over Skull Creek would provide two-way traffic between Jenkins Island and Pinckney Island. 7. On-Island Grade Separation and Relocation: • Grade Separation for Squire Pope Road/Spanish Wells Road would require multiple residential relocations, dramatically increasing costs. • The Windmill Harbor signal will remain as part of the project regardless of the option, excluding Option 6. 8. Mitigation Elements and Community Impact: • Costs for Stoney Community mitigation are only funded if the project extends into the Stoney area. If Option 3 or 4 is selected, funding for Stoney mitigation (as outlined in the Environmental Assessment) would be included. 10 Item 6. 9. Project Timing: • Timeframe for project changes: o Updates to environmental documents would take 6+ months. o Design/build project process will take 14 months. o Right-of-way (ROW) phase takes 12 months. o Construction will span 24-36 months. o Estimate is +/- 32months to get to construction and 24-36 months for construction. 10. Project Coordination and Scope: • Coordination: SCDOT emphasized the need to coordinate efforts. • Meeting with SIB: SCDOT suggested a with the State Infrastructure Bank (SIB) chairman and executive director after local coordination to ensure alignment. • Project Scope Considerations: o A joint resolution by the Town of Hilton Head Island and Beaufort County outlining approved project scope and funding strategy is suggested to resolve concerns and allow SIB consideration. 11. Steps Forward: • The Town of Hilton Head Island and Beaufort County need to continue discussions to reach an agreed-upon position and preference for project advancement. • A joint resolution approved by the Town and County to address concerns raised by the SIB was recommended to be delivered before the March 31, 2025 deadline. • This will provide clarity to SCDOT regarding the local preference for advancing the project. • Beaufort County would need to revise its Intergovernmental Agreement with the SIB as well as its agreement with SCDOT for project scope. 11 Item 6.

Source: Beaufort County website. First collected Nov 14, 2026.