US 278 County Council Workshop
Beaufort County, SC
Executive Conference Room, Administration Building Beaufort County Government Robert
Smalls Complex 100 Ribaut Road, Beaufort
Monday, February 03, 2025
2:00 PM
AGENDA
COUNCIL MEMBERS:
ALICE HOWARD, CHAIR ANNA MARIA TABERNIK, VICE-CHAIR
DAVID P. BARTHOLOMEW PAULA BROWN
LOGAN CUNNINGHAM GERALD DAWSON
YORK GLOVER MARK LAWSON
LAWRENCE MCELYNN JOSEPH PASSIMENT
THOMAS REITZ
1. CALL TO ORDER: Alice Howard, Chair
2. PLEDGE OF ALLEGIANCE : Alice Howard, Chair
3. STATEMENT OF COMPLIANCE WITH FOIA: Alice Howard, Chair
4. APPROVAL OF AGENDA
5. PUBLIC COMMENT PERIOD
6. US 278 CORRIDOR PROJECT STATUS
7. ADJOURNMENT
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
1
2
Item 5.
3-lane Bridge (capable of accommodating 4 th lane) with using portion of Westbound bridge for o island and one of the old Skull Creek for access to Pinckney Island
Retain existing 2 -lane Westbound traic as -is
Remove eastbound Mackay Creek Bridge
Retain existing 2 -lane Westbound traic as -is
Retain eastbound Skull Creek Bridge to allow for
2-way traic to and from Pinckney Island
Build new 3 -lane “lifeline” bridge over
Mackay, Pinckney and Skull Creek
(capable of carrying 4-lanes (two-lanes in
each direction) temporarily)
Build new Hogg Island connector
required for “lifeline” bridge
connection to existing US 278
3
Item 6.
3-lane roadway from Moss Creek to Spanish Wells – lifeline bridge (3-lanes with accommodations for 4th lane)
4
Item 6.
TRAFFIC PATTERN ON NEW BRIDGE CONSTRUCTION - TYPICAL SECTION WITHOUT SHARED-USE PATH
TRAFFIC PATTERN ON NEW BRIDGE CONSTRUCTION - TYPICAL SECTION WITH SHARED-USE PATH
EXISTING WESTBOUND MACKAY CREEK BRIDGE - TYPICAL SECTION
OPTION 2 & 4
OPTION 1 & 3
KCI TECHNOLOGIES
3014 SOUTHCROSS BOULEVARD, ROCK HILL, SC 29730
22'-0"
34'-0"
(T
Y
P
.)
3
'-6
"
0.02 ft/ft 0.02 ft/ft
1'-0" MASH BARRIER
US 278 EASTBOUND
58'-3" (OUT-TO-OUT )
SHOULDER
10'-0"
LANE
12'-0"
LANE
12'-0"
LANE
12'-0"
SHOULDER
10'-0"
FINISHED GRADE
"2
1
1
SLIPFORM EDGE (TYP.)
GUTTERLINEGUTTERLINE
� RELOCATED US 278 EASTBOUND
22'-0"
34'-0"
(T
Y
P
.)
3
'-6
"
0.02 ft/ft 0.02 ft/ft
1'-0" MASH BARRIER
US 278 EASTBOUND
73'-3" (OUT-TO-OUT )
SHOULDER
10'-0"
LANE
12'-0"
LANE
12'-0"
LANE
12'-0"
SHOULDER
10'-0"
FINISHED GRADE
"2
1
1
SLIPFORM EDGE (TYP.)
GUTTERLINEGUTTERLINE
� RELOCATED US 278 EASTBOUND
19'-8"
US 278 WESTBOUND
39'-4" (OUT-TO-OUT)
19'-8"
1'-8"
1'-8"
LANE
12'-0"
SHOULDER
6'-0"
LANE
12'-0"
SHOULDER
6'-0"
SHARED-USE PATH
14'-0"
####
SHEET
-B01030450P
BRIDGE PLANS ID
QUAN.
DR.
DATECHK.BY
REVIEWED
DES.
REV.
REV.
DATECHK.BY
REV.
DESCRIPTION OF REVISION
Adam.Lansing 1/8/2025 9:22:38 AM US 278 Alt Typical Sections.dgn
BEAUFORTCOUNTY: US 278ROUTE:
DEPARTMENT OF TRANSPORTATION
SOUTH CAROLINA
MACKAY CREEK
TRAFFIC PATTERN OVER
JCM
R
I
IF
ETAC
T
R
E
C
UAFO
OHT
ZI
N
O
ITA
NO
S
HTU
RAC
ILO
A
NO. 651
KCI
TECHNOLOGIES
INC.
5
Item 6.
ALTERNATE TRAFFIC PATTERN ON EXISTING SKULL CREEK BRIDGE - TYPICAL SECTION
TRAFFIC PATTERN ON NEW BRIDGE CONSTRUCTION - TYPICAL SECTION WITH SHARED-USE PATH
TRAFFIC PATTERN ON NEW BRIDGE CONSTRUCTION - TYPICAL SECTION WITHOUT SHARED-USE PATH
OPTION 2 & 4
OPTION 1 & 3
KCI TECHNOLOGIES
3014 SOUTHCROSS BOULEVARD, ROCK HILL, SC 29730
22'-0"
34'-0"
(T
Y
P
.)
3
'-6
"
0.02 ft/ft 0.02 ft/ft
1'-0" MASH BARRIER
US 278 EASTBOUND
58'-3" (OUT-TO-OUT)
SHOULDER
10'-0"
LANE
12'-0"
LANE
12'-0"
LANE
12'-0"
SHOULDER
10'-0"
FINISHED GRADE
"2
1
1
SLIPFORM
EDGE (TYP.)
GUTTERLINEGUTTERLINE
� RELOCATED US 278 EASTBOUND
19'-8" 19'-8" 19'-8" 19'-8"
LANE
12'-0"
SHOULDER
6'-0"
LANE
12'-0"
SHOULDER
6'-0"
LANE
12'-0"
SHOULDER
6'-0"
LANE
12'-0"
SHOULDER
6'-0"
1'-8"
1'-8"
US 278 WESTBOUND
39'-4" (OUT-TO-OUT)
PINCKNEY ISLAND ACCESS (CURRENT US 278 EASTBOUND)
39'-4" (OUT-TO-OUT)
22'-0"
34'-0"
(T
Y
P
.)
3
'-6
"
0.02 ft/ft 0.02 ft/ft
1'-0" MASH BARRIER
US 278 EASTBOUND
73'-3" (OUT-TO-OUT )
SHOULDER
10'-0"
LANE
12'-0"
LANE
12'-0"
LANE
12'-0"
SHOULDER
10'-0"
FINISHED GRADE
"2
1
1
GUTTERLINEGUTTERLINE
� RELOCATED US 278 EASTBOUND
SHARED-USE PATH
14'-0"
1'-0"
####
SHEET
B02-030450P
BRIDGE PLANS ID
QUAN.
DR.
DATECHK.BY
REVIEWED
DES.
REV.
REV.
DATECHK.BY
REV.
DESCRIPTION OF REVISION
Adam.Lansing 1/8/2025 9:22:38 AM US 278 Alt Typical Sections.dgn
BEAUFORTCOUNTY: US 278ROUTE:
DEPARTMENT OF TRANSPORTATION
SOUTH CAROLINA
SKULL CREEK
TRAFFIC PATTERN OVER
JCM
R
I
IF
ETAC
T
R
E
C
UAFO
OHT
ZI
N
O
ITA
NO
S
HTU
RAC
ILO
A
NO. 651
KCI
TECHNOLOGIES
INC.
6
Item 6.
0.025 FT/FT0.020 FT/FT0.020 FT/FT
12'12'
16'
12' 11' 11' 11' 12'2'2' 5'10' 15'
12' 12' 12' 12' 12' 12'5'10'2'
0.020 FT/FT
0.020 FT/FT
2:1
4:1
4:1
2:1
8% 8%
2'
PLANS PREPARED BY:
TYPICAL SECTION
PAVEMENT DESIGN
TO STA.CLASSIFICATION
FUNCTIONAL
NO.
03_Typical_Section
MPH FROM STA.
DESIGN SPEED
NO.
SHEETPROJECT ID NO.COUNTYSTATEDIV. NO.
FED. RD.
3 S.C.
COLUMBIA, S.C.
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
TYPICAL SECTION OF IMPROVEMENT
SCALE 1"H =SCALE 1"V =
COLUMBIA, S.C.
DEPARTMENT OF TRANSPORTATION
SOUTH CAROLINA
NTS NTS
TYPICAL
ROUTE
BEAUFORT US 278 3P030450
NOT FOR CONSTRUCTION
RIGHT-OF-WAY PLANS
R/W
EX.
R/W
EX.
100'R/W
NEW
R/W
EX.
(40' SHOWN)
VARIES 40'-55'R/W
EX.
L
LRELOC. C
EXIST. US 278 C
LEXIST. US 278 C
(40' SHOWN)
VARIES 40'-55'R/W
NEW
20'
R/W
EX.
R/W
EX.
R/W
NEW
(55' SHOWN)
VARIES 55'-70'
(55' SHOWN)
VARIES 55'-66'
8'
LEXIST. US 278 C
2'
2'12'
50'
12'12'2'8'4'2'10'
14'
2'
0.020 FT/FT
4:1
2:1
6:1
8% 0.020 FT/FT 0.020 FT/FT
TYPICAL SECTION BETWEEN SQUIRE POPE & SPANISH WELLS - OPTION 4
TYPICAL SECTION IN STONEY COMMUNITY - OPTION 4
TYPICAL SECTION ON JENKINS ISLAND - OPTION 4
STILL IMPACTS PRESENT R/W
NOTE: EB 3-LANE SECTION
RTE./RD.
7
Item 6.
Options: Bridge Roadway R/W Mitigation Utility Subtotal CEI Total
1. Lifeline option w/o MUP (roadway only to tie in) 185.0 14.7 1.5 9.8 23.3 234.3 23.4 257.7
2. Lifefline option w/ MUP (roadway only to tie in) 240.0 15.7 1.5 9.8 23.3 290.3 29.0 319.3
3. Lifeline option w/o MUP (roadway w/ 3-Lane EB from Moss Creek to Spanish Wells) 185.0 22.8 2.9 11.2 26.9 248.8 24.9 273.7
4. Lifeline option w/ MUP (roadway w/ 3-lane EB from Moss Creek to Spanish Wells) 240.0 24.4 4.0 12.6 28.8 309.8 31.0 340.8
5. 2024 anticipated cost for full project 331.3 43.8 5.8 14.0 29.5 424.4 42.4 466.8
6. Replace only Mackay EB Bridge 45.0 14.7 0.8 7.5 12.5 80.5 8.1 88.6
8
Item 6.
Here’s a summary of the information as well as answers obtained from the SCDOT meeting held on
January 30, 2025, at 2:00 pm in Columbia, South Carolina:
Attendees:
Meeting Attendees:
• SCDOT:
Justin Powell, Secretary of Transportation
Rob Perry, PE, Deputy Secretary for Engineering
John Boylston, Chief Engineer for Program Delivery
Maggie Hendry, Chief Administrative Officer
Craig Winn, PE, Lowcountry Program Manager
• Town of Hilton Head Island:
Alan Perry, Mayor
Alex Brown, Councilman
Steve Desimone, Councilman
Marc Orlando, Town Manager
Shawn Colin, Assistant Town Manager
• Beaufort County:
Alice Howard, County Council Chair
Tab Tabernik, County Council
Michael Moore, Administrator
Jared Fralix, Assistant Administrator
1
. Bridge/Project Options Overview:
• Option 1: $257.7M – Lifeline option without multiuse pathway. Includes a 3-lane bridge with
breakdown lanes. The bridge would be stripped for two-lanes. Cost Comparison: The costs
of half the project may not necessarily be half the total cost.
• Option 2: $319.3M – Lifeline option with multiuse pathway. Includes a 3-lane bridge with
b
reakdown lanes and a protected multiuse pathway.
• Option 3: $273.7M – Lifeline option without multiuse pathway. Includes 3 lanes eastbound
from Moss Creek to Spanish Wells Road.
• Option 4: $340.8M – Lifeline option with multiuse pathway. Includes 3 lanes eastbound
from Moss Creek to Spanish Wells Road, a protected multiuse pathway on the bridge, and a
pathway connection to Moss Creek and Jenkins Island.
• Option 5: $466.8M – Full project cost anticipated for 2024.
• Option 6: $88.6M – Replacement of only the MacKay Creek eastbound bridge.
o Option 3 or 4 may take longer to move through the process and construction
p
hases.
o Projects beyond the bridge scope may be included in the Lowcountry Area
Transportation Study for programming and funding considerations.
9
Item 6.
2. SCDOT is considering a Design Build approach to the project to help with pricing.
• A design-build option will consider design alternatives, including bike and pedestrian
connections.
• SCDOT has seen a 70 percent project cost escalation over the past few years.
3. Tolls and Reversible Lanes:
• Tolls: Tolls are prohibited on existing free facilities (as per South Carolina Statute).
o Tolls for express routes (e.g., to Cross Island Parkway) would require extended
evaluation, including a toll study, environmental review, and permitting.
• Reversible Lanes: SCDOT opposes reversible lanes due to safety, compliance issues, and
the high cost of operation and maintenance. SCDOT is not in the business of reversible
lanes.
4. Utility Relocation and Funding:
Utility relocation costs are part of the project; SCDOT will pay per South Carolina code Act
36.
SCDOT will cover utility relocation costs in accordance with the Utility Relocation Act, and
additional funding could come from local funds
5. Pinckney Island/Skull Creek Bridges:
The preference is for a new eastbound bridge to be elevated over Pinckney Island. Touching
down on Pinckney Island would increase costs, and reduce safety by having at grade
movements.
6. Skull Creek Bridge Substructure:
• The existing substructure supports both the eastbound and westbound bridge decks. The
eastbound deck must be kept if the westbound deck remains. The existing eastbound
bridge over Skull Creek would provide two-way traffic between Jenkins Island and Pinckney
Island.
7. On-Island Grade Separation and Relocation:
• Grade Separation for Squire Pope Road/Spanish Wells Road would require multiple
residential relocations, dramatically increasing costs.
• The Windmill Harbor signal will remain as part of the project regardless of the option,
excluding Option 6.
8. Mitigation Elements and Community Impact:
• Costs for Stoney Community mitigation are only funded if the project extends into the
Stoney area. If Option 3 or 4 is selected, funding for Stoney mitigation (as outlined in the
Environmental Assessment) would be included.
10
Item 6.
9. Project Timing:
• Timeframe for project changes:
o Updates to environmental documents would take 6+ months.
o Design/build project process will take 14 months.
o Right-of-way (ROW) phase takes 12 months.
o Construction will span 24-36 months.
o Estimate is +/- 32months to get to construction and 24-36 months for construction.
10. Project Coordination and Scope:
• Coordination: SCDOT emphasized the need to coordinate efforts.
• Meeting with SIB: SCDOT suggested a with the State Infrastructure Bank (SIB) chairman and
executive director after local coordination to ensure alignment.
• Project Scope Considerations:
o A joint resolution by the Town of Hilton Head Island and Beaufort County outlining
approved project scope and funding strategy is suggested to resolve concerns and
allow SIB consideration.
11. Steps Forward:
• The Town of Hilton Head Island and Beaufort County need to continue discussions to reach
an agreed-upon position and preference for project advancement.
• A joint resolution approved by the Town and County to address concerns raised by the SIB
was recommended to be delivered before the March 31, 2025 deadline.
• This will provide clarity to SCDOT regarding the local preference for advancing the project.
• Beaufort County would need to revise its Intergovernmental Agreement with the SIB as well
as its agreement with SCDOT for project scope.
11