Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, September 16, 2024
3:00 PM
AGENDA
COMMITTEE MEMBERS:
BLOGAN CUNNINGHAM, CHAIRMAN DAVID P. BARTHOLOMEW, VICE-CHAIRMAN
THOMAS REITZ PAULA BROWN
ANNA MARIA TABERNIK JOSEPH F. PASSIMENT, EX-OFFICIO
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. PUBLIC NOTIFICATION OF THIS MEETING HAS BEEN PUBLISHED, POSTED, AND DISTRIBUTED IN
COMPLIANCE WITH THE SOUTH CAROLINA FREEDOM OF INFORMATION ACT
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES - August 19, 2024
6. CITIZEN COMMENT PERIOD- 15 MINUTES TOTAL
Anyone who wishes to speak during the Citizen Comment portion of the meeting will limit their
comments and speak no longer than three (3) minutes. Speakers will address Council in a respectful
manner appropriate to the decorum of the meeting, refraining fr om the use of profane, abusive, or
obscene language. In accordance with Beaufort County's Rules and Procedures, giving of a speaker's
time to another is not allowed.
7. ASSISTANT COUNTY ADMINISTRATOR REPORT
AGENDA ITEMS
8. RECOMMEND APPROVAL TO COUNCIL OF AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR
TO ENTER INTO A LEASE AGREEMENT WITH LOWCOUNTRY REGIONAL TRANSPORTATION AUTHORITY FOR
THE COUNTY OWNED REAL PROPERTY LOCATED AT 316 CASTLE ROCK ROAD - Jared Fralix, P.E., AC A
Engineering
1
County Council Agenda – Beaufort County, SC
9. RECOMMEND APPROVAL OF A REQUEST TO PURCHASE (1) CAT 308 MINI HYDRAULIC EXCAVATOR
($154,771). (FISCAL IMPACT: $154,771 the funding for this item has been approved in the fy 2025 budget
under the stormwater account #5025-90-9020-54000) - Jared Fralix, P.E., ACA Engineering
10. RECOMMEND APPROVAL TO COUNCIL OF A CHANGE ORDER TO DAVIS & FLOYD FOR RFP#092420TE
LADY’S ISLAND ACCESS ROADS DESIGN AND ENGINEERING (FISCAL IMPACT: $556,644) - Jared Fralix, P.E.,
ACA Engineering
11. RECOMMEND APPROVAL TO COUNCIL OF A TRANSFER OF FUNDS BETWEEN AIRPORT ACCOUNTS AND A
CONTRACT AWARD TO GULF STREAM CONSTRUCTION FOR IFB#081424 BEAUFORT COUNTY EXECUTIVE
AIRPORT SITEWORK CONSTRUCTION SERVICES. (FISCAL IMPACT: Funding will consist of the remain ing
$1,313,900 of the allocated ARPA funds (Acct# 2330-10-0000-59100 ) and the difference of $788,593.69
will be covered by the Airports’ Pooled Cash Account (Acct# 5400 -90-0000-10400) once the transfer is
approved and executed. Current Balance in the Pooled cash account from which the transfer is funded
is $2,102,493.69) - Hank Amundson, Special Assistant to the Administrator & Jared Fralix, ACA
Infrastructure
12. RECOMMEND APPROVAL TO COUNCIL OF CONTRA CT AWARD TO GULF STREAM CONSTRUCTION FOR
IFB#072224 BEAUFORT COUNTY GOVERNMENT CENTER (NEW ARTHUR HORNE) PARKING LOT PROJECT
(Fiscal Impact: $880,546.77) - Robert Gecy, Project Manager Capital Projects
13. ADJOURNMENT
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
2
Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Monday, August 19, 2024
3:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic
or the complete meeting. https://beaufortcountysc.new.swagit.com/videos/312701
COMMITTEE MEMBERS:
BLOGAN CUNNINGHAM, CHAIRMAN DAVID P. BARTHOLOMEW, VICE-CHAIRMAN
THOMAS REITZ PAULA BROWN
ANNA MARIA TABERNIK JOSEPH F. PASSIMENT, EX-OFFICIO
1. CALL TO ORDER
Committee Chairman Cunningham called the meeting to order at 3:09pm.
PRESENT
Committee Chair Logan Cunningham
Committee Vice-Chair David Bartholomew
Ex-Officio Joseph Passiment
Council Member Paula Brown
Council Member Thomas Reitz
Council Member Anna Maria Tabernik
Council Member York Glover
Council Member Alice Howard
Council Member Gerald Dawson
Council Member Mark Lawson
Council Member Lawrence McElynn
2. PLEDGE OF ALLEGIANCE
Committee Chairman led the Pledge of Allegiance.
3
Item 5.
Public Facilities and Safety Use Minutes – Beaufort County, SC
3. FOIA
Committee Chairman noted the public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act.
4. APPROVAL OF AGENDA
Motion: It was moved by Council Member Tabernik, Seconded by Vice-Chairman Bartholomew to
approve the agenda.
Vote: Motion was approved without objection.
5. APPROVAL OF MINUTES- June 04, 2024 & June 24, 2024
Motion: It was moved by Council Member Tabernik, Seconded by Vice-Chairman Bartholomew to
approve the minutes of June 04, 2024, and June 24, 2024.
Vote: Motion was approved without objection.
6. CITIZEN COMMENT PERIOD
No Citizen Comments.
7. ASSISTANT COUNTY ADMINISTRATOR REPORT- Jared Fralix, Infrastructure
Please watch the video stream to view the full presentation.
https://beaufortcountysc.new.swagit.com/videos/312701?ts=116
AGENDA ITEMS
8. 2018 ONE CENT TRANSPORTATION SALES TAX UPDATE
Please watch the video stream to view the full update.
https://beaufortcountysc.new.swagit.com/videos/312701?ts=978
9. PRESENTATION ON ROAD AND SIGNAL ASSETS
Please watch the video stream to view the full presentation.
https://beaufortcountysc.new.swagit.com/videos/312701?ts=3687
10. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION TO ADOPT THE 2023 BEAUFORT COUNTY
TRAFFIC CALMING POLICY
Motion: It was moved by Council Member Tabernik, Seconded by Council Member Howard to
recommend approval to council of a resolution to adopt the 2023 Beaufort County Traffic Calming
Policy.
Vote: Motion was approved without objection.
4
Item 5.
Public Facilities and Safety Use Minutes – Beaufort County, SC
11. RECOMMEND APPROVAL TO COUNCIL TO AUTHORIZE THE COUNTY ADMINISTRATOR TO ENTER A
LOCAL PUBLIC AGENCY (LPA) AGREEMENT WITH THE SOUTH CAROLINA DEPARTMENT OF
TRANSPORTATION (SCDOT) FOR THREE PROJECTS: US 278 CORRIDOR STUDY, SC 170 CORRIDOR STUDY,
AND INTELLIGENT TRANSPORTATION SYSTEM (ITS) MASTER PLAN
Motion: It was moved by Ex-Officio Passiment, Seconded by Council Member Glover to recommend
approval to Council to authorize the County Administrator to enter a local public agency (LPA)
agreement with the South Carolina department of transportation (SCDOT) for three projects: US 278
corridor study, SC 170 corridor study, and intelligent transportation system (ITS) master plan.
Vote: Motion was approved without objection.
12. RECOMMEND APPROVAL TO COUNCIL OF AN ORDINANCE AUTHORIZING THE COUNTY
ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS, TO PROVIDE FUNDING FOR THE
PURCHASE OF REAL PROPERTY IDENTIFIED AS COOLER TRACT B
Motion: It was moved by Council Member Tabernik, Seconded by Council Member Howard to
recommend approval to Council of an ordinance authorizing the County Administrator to execute the
necessary documents, to provide funding for the purchase of real property identified as Cooler Tract B.
Vote: Motion was approved without objection.
13. RECOMMEND APPROVAL TO COUNCIL TO AWARD A CONTRACT TO WOOD & PARTNERS FOR IFB
#030524 CAMP ST. MARY’S PARK A&E SERVICE
Motion: It was moved by Council Member Glover, Seconded by Council Member Tabernik to
recommend approval to Council to award a contract to Wood & Partners for IFB #030524 camp St.
Mary’s Park A&E service.
Vote: Motion was approved without objection.
Noted: The total amount of funding was adjusted to $312,565.00.
14. RECOMMEND APPROVAL OF CONTRACT AWARD TO WILMA'S TANK & PUMP COMPANY FOR IFB
#061124, CAMP ST. MARY'S BUILDING DEMOLITION
Motion: It was moved by Council Member Tabernik, Seconded by Ex-Officio Passiment to recommend
approval of contract award to Wilma’s Tank & Pump company for IFB #061124, Camp St. Mary’s building
demolition.
Vote: Motion was approved without objection.
15. APPROVAL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ACCEPT A SOLID WASTE
MANAGEMENT GRANT FROM THE SOUTH CAROLINA DEPART MENT OF ENVIRONMENTAL SERVICES
(DES) FOR $115,750.00
Motion: It was moved by Ex-Officio Passiment, Seconded by Council Member Glover to approve an
approval of a resolution authorizing the County Administrator to accept a Solid Waste Management
grant from the South Carolina Department of Environmental Services (DES) for $115,750.00.
Vote: Motion was approved without objection.
5
Item 5.
Public Facilities and Safety Use Minutes – Beaufort County, SC
16. RECOMMEND APPROVAL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ACCEPT
A WASTE OIL GRANT FROM THE SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES (DES)
FOR $68,403.60
Motion: It was moved by Council Member Howard, Seconded by Council Member Tabernik to
recommend approval of a resolution authorizing the County Administrator to accept a Waste Oil grant
from the South Carolina Department of Environmental Services (DES) for $68,403.60.
Vote: Motion was approved without objection.
17. DISCUSSION REGARDING FUNDING OF A HANGAR CONSTRUCTION PROJECT AT THE BEAUFORT
EXECUTIVE AIRPORT
Please watch the video stream to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/312701?ts=6310
18. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION TO ACCEPT FAA AIRPORT IMPROVEMENT
PROJECT GRANT (AIP) FOR ST. JAMES BAPTIST CHURCH RELOCATION ENVIRONMENTAL
DOCUMENTATION PHASE I - CONTINGENT UPON FINAL FAA OFFER
Motion: It was moved by Council Member Howard, Seconded by Council Member Reitz to recommend
approval to Council of a resolution to accept FAA Airport Improvement Project Grant (AIP) for St. James
Baptist church relocation environmental documentation phase I - contingent upon final FAA offer.
Vote: Motion was approved without objection.
19. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION TO ACCEPT FAA BIL AIG GRANT FUNDING FOR
THE BEAUFORT EXECUTIVE AIRPORT (ARW) RUNWAY 07/25 REHABILITATION (CONSTRUCTION)
PROJECT
Motion: It was moved by Council Member Reitz, Seconded by Council Member Glover to recommend
approval to Council of a resolution to accept FAA BIL AIG grant funding for the Beaufort Executive
Airport (ARW) runway 07/25 rehabilitation (construction) project.
Vote: Motion was approved without objection.
20. A RESOLUTION TO ACCEPT FAA AIP GRANT FUNDING FOR THE BEAUFORT EXECUTIVE AIRPORT (ARW)
RUNWAY 07/25 REHABILITATION (CONSTRUCTION) PROJECT
Motion: It was moved by Vice-Chairman Bartholomew, Seconded by Council Member Glover to approve
a resolution to accept FAA AIP grant funding for the Beaufort Executive Airport (ARW) runway 07/25
rehabilitation (construction) project.
Vote: Motion was approved without objection.
21. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION TO ACCEPT FAA BIPARTISAN
INFRASTRUCTURE LAW (BIL) AI RPORT INFRASTRUCTURE GRANT (AIG) FOR THE HILTON HEAD ISLAND
AIRPORT (HXD) AIRPORT LAYOUT PLAN (ALP)
6
Item 5.
Public Facilities and Safety Use Minutes – Beaufort County, SC
Motion: It was moved by Council Member Tabernik, Seconded by Council Member Brown to
recommend approval to council of a resolution to accept FAA Bipartisan Infrastructure Law (BIL) Airport
Infrastructure Grant (AIG) for the Hilton Head Island Airport (HXD) Airport Layout Plan (ALP).
Vote: Motion was approved without objection.
(Items #22 – 25 were taken together)
Motion: It was moved by Council Member Reitz, Seconded by Council Member Tabernik to take items
22-25 together.
Vote: Motion was approved without objection
22. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR
TO ENTER INTOA LETTER OF AGREEMENT FOR TAXI/LIMOUSINE SERVICE BETWEEN BEAUFORT COUNTY
AND S & J EXPRESSWAY TAXI, INC.
Motion: It was moved by Council Member Reitz, Seconded by Council Member Tabernik to recommend
approval to Council of a resolution authorizing the County Administrator to enter Intoa letter of
agreement for taxi/limousine service between Beaufort County and S & J Expressway Taxi, inc.
Vote: Motion was approved without objection
23. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR
TO ENTER INTO A LETTER OF AGREEMENT FOR TAXI/LIMOUSINE SERVICE BETWEEN BEAUFORT COUNTY
AND NATIVE ISLANDER’S TRANSPORTATION, LLC
Motion: It was moved by Council Member Reitz, Seconded by Council Member Tabernik to recommend
approval to council of a resolution authorizing the County Administrator to enter into a letter of
agreement for taxi/limousine service between Beaufort County and Native Islander’s Transportation,
LLC.
Vote: Motion was approved without objection
24. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR
TO ENTER INTO A LETTER OF AGREEMENT FOR TAXI/LIMOUSINE SERVICE BETWEEN BEAUFORT COUNTY
AND FERGUSON TRANSPORTATION
Motion: It was moved by Council Member Reitz, Seconded by Council Member Tabernik to recommend
approval to Council of a resolution authorizing the County Administrator to enter into a letter of
agreement for taxi/limousine service between Beaufort County and Ferguson Transportation.
Vote: Motion was approved without objection
25. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR
TO ENTER INTO A LETTER OF AGREEMENT FOR TAXI/LIMOUSINE SERVICE BETWEEN BEAUFORT COUNTY
AND APPLE TRANSPORTATION
Motion: It was moved by Council Member Reitz, Seconded by Council Member Tabernik to recommend
approval to Council of a resolution authorizing the County Administrator to enter into a letter of
agreement for taxi/limousine service between Beaufort County and Apple Transportation.
7
Item 5.
Public Facilities and Safety Use Minutes – Beaufort County, SC
Vote: Motion was approved without objection
(Items #26 – 28 were taken together)
Motion: It was moved by Council Member Reitz, Seconded by Council Member Howard to take items
22-25 together.
Vote: Motion was approved without objection
26. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR
TO ENTER INTO A NON-TENANT COMMERCIAL OPERATING AGREEMENT BETWEEN BEAUFORT COUNTY
AND STEVENS AEROSPACE AND DEFENSE SYSTEM
Motion: It was moved by Ex-Officio Passiment, Seconded by Council Member Reitz to recommend
approval to Council of a resolution authorizing the County Administrator to enter into a non-tenant
commercial operating agreement between Beaufort County and Stevens Aerospace and Defense
System.
Vote: Motion was approved without objection.
27. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR
TO ENTER INTO A NON-TENANT COMMERCIAL OPERATING AGREEMENT BETWEEN BEAUFORT COUNTY
AND EGA AERO SPECIALTY SERVICES LLC
Motion: It was moved by Ex-Officio Passiment, Seconded by Council Member Reitz to recommend
approval to Council of a resolution authorizing the County Administrator to enter into a non-tenant
commercial operating agreement between Beaufort County and EGA Aero Specialty Services LLC.
Vote: Motion was approved without objection.
28. RECOMMEND APPROVAL TO COUNCIL OF A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR
TO ENTER INTO A NON-TENANT COMMERCIAL OPERATING AGREEMENT BETWEEN BEAUFORT COUNTY
AND CONSTANT AVIATION
Motion: It was moved by Ex-Officio Passiment, Seconded by Council Member Reitz to recommend
approval to Council of a resolution authorizing the County Administrator to enter into a non-tenant
commercial operating agreement between Beaufort County and Constant Aviation.
Vote: Motion was approved without objection.
29. ADJOURNMENT
Committee Chairman adjourned the meeting at 5:23pm.
Ratified:
8
Item 5.
9
Item 6.
September 14, 2024
Dear County Council Members,
My name is Craig Reaves, I am a long-time resident of Beaufort County. I am writing you today as
a concerned citizen and businessman in reference to the subject of Pine Island and the way it will be
developed.
My family moved to Beaufort County in 1992 and have established our businesses over the past
thirty-two (32) years. My father began shrimping in the 1960’s and has passed down his love of the
ocean and the commercial fishing industry to his children and our families. Currently, we have three
generations residing in Beaufort County and working in the commercial fishing industry. Our family owns
and operates four (4) shrimp trawlers from Village Creek located on St. Helena Island. In addition, my
wife, Jana, and I have established businesses in the Town of Port Royal (C.J. Seafood Express), City of
Beaufort (Sea Eagle Market), and Beaufort County, St. Helena Island (Sea Eagle Market @ Village Creek).
We have worked hard to not only survive, but thrive in an industry that has been declining for a couple
of decades. Today our businesses consist of retail seafood markets, shellfish operation, shrimp dock
operation and a thriving catering business. We have twenty-four (24) W-2 employees and thirty (30)
1099 commercial fishermen whose families depend on us to make a living; most of which work out of St.
Helena. I say all of this so you understand that we are heavily invested in what happens in Beaufort
County and most especially, what happens on Village Creek.
When we moved to Beaufort County in 1992 there were nearly one-hundred (100) commercial
shrimp trawlers North of the Broad. In 2024 there are twenty (20) commercial shrimp trawlers in all of
Beaufort County; Four (4) located South of the Broad and sixteen (16) North of the Broad and of the
sixteen, ten (10) are located on Village Creek. This makes Village Creek the primary location for
commercial shrimp trawlers in all of Beaufort County. There are five (5) shrimp dock businesses and ten
(10) commercial shrimp trawlers that navigate the narrow Village Creek channel to harvest the shrimp
our local community so proudly boasts about. The fact that half of all the commercial shrimp trawlers
left in all of Beaufort County and are on Village Creek should carry a substantial amount of
consideration when it comes to developing Pine Island, which is also located on Village Creek.
The Pine Island development is a major concern for all of us located on Village Creek. I truly believe that
the CPO does not protect us or the natural resource by allowing 150+ homes and over 100 docks to be
built. The CPO development plan by potentially adding 300-500 residents would cause additional strain
on our community infrastructure (additional traffic, wear and tear on roads, additional utilities, schools,
emergency services, etc.). The CPO development plan, by allowing so many homes to be built would
create a large uncontrolled run-off into our ecosystem harming our wildlife and natural resources. Village
Creek cannot handle 100 more docks protruding into the already narrow navigational space. Honestly, it
would be devastating to the seafood industry. We watermen love our community our estuaries and our
ocean. We must take care of them if we want to continue our commercial fishing heritage for
generations to come.
10
Item 7.
I have reviewed the option being offered by PID to reduce homes by 60% and docks by 90%,
which would clearly reduce the pressure put on our community infrastructure, limiting the number of
dock protrusions into the navigational waters of Village Creek, limiting the amount of runoff into our
natural river system. I do not understand why a golf course with buffer zones, basically creating an 80%
green space is such a stigmatizing option.
I am begging all of you on the Beaufort County Council to tune out the “noise” and focus on
what is best for everyone overall. While it would be nice to keep things the way they are with no
development of Pine Island for years to come; that is not a realistic option. Pine Island has been privately
owned for more than 100 years without local folks having access to it and there are no residents being
displaced.
So, you are now presented with two options:
1- CPO creating overdevelopment by allowing 150+ homes, 300-500 additional residents straining
the current infrastructure, 100+ docks protruding into a narrow navigational river basically
cutting off the river for half of Beaufort County’s commercial shrimping fleet, uncontrolled
runoff of pesticides and chemicals into the estuary harming our ecosystem.
2- PID option with minimal houses, NO permanent residents, NO additional strain on
infrastructure, minimal docks that shrimp boats can navigate around, managed green space with
minimal runoff into the estuary.
In conclusion, I believe the simple facts presented show that the PID option is the best option for
everyone, especially those of us trying to preserve our small community of commercial fishermen and
families on Village Creek.
Respectfully,
Craig Reaves
Beaufort County’s Commercial Shrimping Fleet in 2024 consists of 20 commercial trawlers total.
(4) commercial shrimp boats located South of the Broad
Larry Toomer has 1 boat in Bluffton, Skip Toomer has 1 boat in Hilton Head and Jeff Toomer has 2 boats
in Hilton Head
(6) commercial shrimp boats located North of the Broad
Gay Fish has 5 boats on Ward’s Creek, Sweet Tails has 1 boat on Coffin Creek
(10) commercial shrimp boats located North of the Broad on Village Creek
Bradley’s Seafood has 1 boat, St. Helena Fish & Shrimp has 2 boats, Eve Seafood has 1 boat, Chaplin’s
have 1 boat and Sea Eagle Market @ Village Creek has 5 boats.
11
Item 7.
A resource center adjacent to the Beaufort County Animal Campus with emergency medical facility and to care for
sick and injured wild animals
Provide resources to permitted rehabbers for medical care, medicine during their recovery until it is deemed the
animal is healthy and ready for relocation back into the wild
This new wildlife resource center aims to fill a gap for wildlife
Keeping the wild in wildlife
Wildlife rehabilitation does not attempt to turn wild animals into pets. Human contact with patients is kept to a
minimum, and animals are held with permitted rehabbers only until they can live independently in the wild. Animals with
injuries or illnesses that prevent them from surviving in the wild are humanely euthanized.
Releasing the wild patients
For rehabilitation to be deemed successful released animals must be able to survive on their own and be an integral part
of their species’ population, i.e., recognize and obtain appropriate foods, select mates of their own species to reproduce,
and respond appropriately to potential dangers (flee or fight). These dangers include people, cars, dogs and natural
predators.
Education
Wildlife Centers provides an opportunity for public education about the dangers wild animals face in an increasingly
human-dominated landscape. This critical part of our work helps wildlife on a much larger scale than wildlife
rehabilitation could alone.
Please join us by making your generous donation to the Wildlife Campus of Beaufort County.
Contributions to the Wildlife Campus of Beaufort County are tax deductible to the full extent of the law.
Mail to: Community Foundation of the Lowcountry
PO Box 23019 Hilton Head Island, SC, 29925
Working together, we can keep wildlife around and thriving for future generations
The Wildlife Campus of Beaufort County (WCBC) is embarking on establishing a long overdue wildlife campus to serve
Beaufort County. The demand for wildlife response has skyrocketed due to the human population increase which
co
ntinues to degrade wildlife’s natural habitats within Beaufort County. With this loss of natural habitat we often see
in
creased wildlife in populated areas which normally causes injury to the animal and or danger to people from
interaction or vehicle collisions. With your donation to WCBC you would be investing in a capital start up campaign in
order to meet the increased demand for our services in wildlife conservation, medical services, and
environmental/wildlife education. Only with your support will we be able to fulfill our vision and make the Wildlife
Campus of Beaufort County a reality.
Your donation to the Wildlife Campus of Beaufort County will help provide:
12
Item 7.
13
Item 7.
14
Item 7.
15
Item 7.
16
Item 7.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A LEASE AGREEMENT WITH
LOWCOUNTRY REGIONAL TRANSPORTATION AUTHORITY FOR THE COUNTY OWNED REAL PROPERTY
LOCATED AT 316 CASTLE ROCK ROAD
MEETING NAME AND DATE:
Public Facilities and Safety Committee; August 19, 2024
PRESENTER INFORMATION:
Jared Fralix, Assistant County Administrator – Infrastructure
5 Minutes
ITEM BACKGROUND:
Lowcountry Area Transportation Authority, also known as Palmetto Breeze, is our transit partner for the
region providing mass transit opportunities for residents of Beaufort County. We support Palmetto Breeze
with funding from our annual budget to assist in the operational cost of providing the service to
unincorporated Beaufort County residents.
PROJECT / ITEM NARRATIVE:
Lowcountry Area Transportation Authority, also known as Palmetto Breeze, needs space in Northern
Beaufort County for parking buses. Currently, approximately 15 of the 40 buses within their fleet are parked
in the driveways of the driver’s residence because they do not have a storage lot for their fleet. A centralized
storage lot would reduce operational cost and increase security of their buses. Beaufort County owns a 1.0
acre lot at the intersection of Grober Hill Rd and Castle Rock Rd that was formerly used as a convenience
center. The property is currently vacant and is identified as surplus property. Rather than sell the property,
staff proposes to enter into a lease agreem ent with our transit partner, Palmetto Breeze, for use of the
parcel as a bus storage facility.
FISCAL IMPACT:
Income from lease in accordance with the Beaufort County Lease Policy. The applicable section of the lease
policy reads:
The administrator may in its discretion reduce the lease rate to a nominal amount if determined the use of
the Property is a benefit to the community that would not otherwise be available with an increased lease
rate. The reduced lease rate described in t his Section must be presented to County Council and receive a
majority vote approval.
STAFF RECOMMENDATIONS TO COUNCIL:
Approve a lease with LRTA at nominal rate for use of the property as a bus storage facility
OPTIONS FOR COUNCIL MOTION:
Motion to disapprove.
Move forward to Council on August 26, 2024; public hearing is required.
17
Item 8.
1
ORDINANCE 2024/_____
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER
INTO A LEASE AGREEMENT WITH LOWCOUNTRY REGIONAL
TRANSPORTATION AUTHORITY FOR THE COUNTY OWNED REAL PROPERTY
LOCATED AT 316 CASTLE ROCK ROAD
WHEREAS, Beaufort County (“County”) is the fee simple owner of the property located
at 316 Castle Rock Road, Beaufort, SC 29906 (“Property”); and
WHEREAS, the Lowcountry Regional Transportation Authority (“LRTA”) was
established in 1978 as the primary public transportation provider for Beaufort County; and
WHEREAS, as the transportation authority , LRTA’s mission is to work relentlessly to
achieve coordination and pursue customer service satisfaction while providing freedom of mobility
and independence to our residents and visitors in an environmentally friendly manner; and
WHEREAS, the County desires to lease the Property to LRTA for the purpose of
establishing vehicular storage for LRTA to further their mission. By leasing the Property to LRTA
it will provide a centralized and secure location for vehicular storage that is currently not in place.
Pursuant to the Beaufort County Lease Policy, the County desires to establish a nominal lease rate
due to the benefit to the community that is otherwise unavailable; and
WHEREAS, County Council finds that it is in the best interest of the citizens and residents
of Beaufort County for the County Administrator to enter into a lease with LRTA at a nominal rate
for the Property.
NOW, THEREFORE, BE IT ORDAINED that Beaufort County Council , duly
assembled, does hereby authorize the County Administrator to enter into a lease agreement with
Lowcountry Regional Transportation Authority for the real property located at 314 Castle Rock
Road.
Adopted this ____ day of __________, 2024.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Joseph Passiment, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
18
Item 8.
19
Item 8.
Landlord Initials _______ Tenant Initials _______
1
STATE OF SOUTH CAROLINA )
) REAL PROPERTY
COUNTY OF BEAUFORT ) LEASE AGREEMENT
THIS REAL PROPERTY LEASE AGREEMENT is made and entered into this ____ day of
______________, 2024(“Lease”), by and between Beaufort County, a political subdivision of the State
of South Carolina, (“Landlord”) and Lowcountry Regional Transportation Authority (“Tenant”),
collectively referred to as the “Parties”.
NOW, THEREFORE, Landlord, for and in consideration of the rents paid and to be paid, and the
covenants, conditions, and stipulations to be kept and performed by Tenant, agrees to lease the Premises
described herein below.
I. DESCRIPTION OF LEASED PREMISES. The premises to be conveyed is located at 316
Castle Rock Road, Beaufort, SC 29906 with the current Parcel Number R100 031 000 039A
0000, hereinafter referred to as “Premises”.
II. TERM
2.1 Term. The Lease Term shall be for a term of one (1) year (“Tenancy”) commencing on October 1,
2024, (“Commencement Date”) and terminating on September 30, 2025 (“Termination Date”).
2.2 Renewal. This Lease may be renewed upon the mutual consent of the Parties and agreed upon in
writing. Any Renewal Term shall include the same terms as this Lease and be for a period of one
(1) year. This Lease may only be renewed up to four (4) times. Tenant shall notify the Landlord
in writing of its desire to renew no later than ninety (90) days before the expiration of the Initial
Term or any Renewal Term. The terms set forth in this Paragraph shall collectively be referred to
hereafter as a “Renewal Term”.
III. RENTAL PAYMENT
3.1 Payment of Rent. Tenant shall pay to Landlord One Dollars ($1.00) in yearly base rental payments
(“Rent”) during the Lease Term. If occupancy begins and/or ends on any day other than the first
day of a month, Rent shall be prorated for the month of commencement and/or month of termination
and monthly rent collected in advance thereafter.
The first Rent payment shall be made on or before the Commencement Date. Tenant shall pay all
rents due and owing, without deduction or set off, to Landlord at the address set forth in Section 9.
All Rent payments shall be made in the form of check or direct deposit.
3.2 Renewal Rate. The Rent shall remain the same for any Renewal Term.
3.3 Late Payment of Rent. Any Rent not paid within ten (10) days of the due date shall be deemed late
and shall obligate Tenant to pay a late charge of five percent (5%) of the sum then due.
IV. UTILITIES. Tenant shall be responsible for paying one hundred (100%) percent of all utility
expenses associated with the Premises during the Initial Term and any Renewal Term. Tenant
warrants and agrees to establish accounts in its name with the providing/billing entity or authority
and pay for all water, gas, power, electric current, garbage collection and removal, sewer charges,
20
Item 8.
Landlord Initials _______ Tenant Initials _______
2
and all other utilities and utility charges and fees charged to the Premises during the term of this
Lease and all extensions hereof. Tenant agrees to maintain all utilities at all times during its
tenancy, regardless of whether or not Tenant is physically occupying the Premise.
V. CONDITION, USE, MAINTENANCE AND REPAIRS OF PREMISES
5.1 Acceptance and Condition of the Premises . The Parties mutually agree that Tenant shall take
possession of the Premises on the Commencement Date. Tenant stipulates that he or she has
examined the Premises, including the grounds and all buildings and improvements, and that they
are, at the time o f this Agreement, in good order, repair, and in a safe, clean and tenantable
condition. Landlord has made no representation in connection with the Premises and shall not be
liable for any latent defects therein; provided, however, that if such latent defe cts render the
Premises uninhabitable for the purposes of this Lease, Tenant may at its option, and upon written
notice to Landlord, terminate this Lease.
5.2 Use of Premises. Tenant shall use the Premises for the sole purpose of bus parking storage lot
(“Permitted Use”). Any change in the use of the Premises may only be undertaken with the written
consent of the Landlord. Tenant shall not use the Premises for any illegal purpose, nor violate any
statute, regulation, rule or order of any governmental body in its use thereof, nor create or allow to
exist any nuisances, nor do any act in or about the Premises or bring anything upon the Premises
which will increase the premium for insurance on the Premises.
5.3 Maintenance. Tenant, at its sole cost and expense, shall handle or contract for the maintenance of
the parking areas, fencing (including gates), landscaping, grounds and planting care for the
Premises, and shall generally maintain the Premises in a neat and orderly condition.
5.4 Repairs of Premises . Landlord shall keep the foundations, exterior building, the roof of the
Premises, the air conditioning, heating, electrical and plumbing systems contained within the
Premises in good repair, except the Landlord shall not be required to make any repairs occasioned
by acts of Tenant or sub tenant. In the event the Premises should become in need of repairs required
to be made by Landlord hereunder, Tenant shall give immediate written notice thereof to Landlord.
Except as otherwise provided in the Section, Tenant shall at its old cost and expense, maintain the
Premises in good condition and repair, normal wear and tear expected.
5.5 Tenant shall provide minor maintenance and repairs to the Premises during the Term, up to a
maximum cost of five hundred ($500.00) dollars per repair to keep the Premises in good repair.
Tenant shall not perform any additional work upon the Premise s without prior written consent of
the Landlord. The Premises shall be maintained in a clean and orderly manner. In the event of any
damage of the Pr emises which is the direct result of Tenant, Tenant shall, immediately upon
receiving demand from Landlord, correct the damage.
5.6 Tenant Improvements, Alterations, and Restorations.
5.6.1 Initial Improvements. Prior to Landlord’s delivery of the Premises to Tenant,
Landlord shall proceed to demolish and remove the existing ramp used for the convenience center,
grade and level lot, replace existing chain link and wooden fences with a new chain link fence
(including 2 rolling gates) and perform such improvements that are required to utilize the Premises
for the Permitted Use, which shall include bus parking storage lot (the “Tenant’s Initial
Improvements”)..
21
Item 8.
Landlord Initials _______ Tenant Initials _______
3
5.6.2 Additional Improvements. Tenant shall not make or permit to be made any
structural alterations, modifications, additions, decorations or improvements to the Premises, nor
shall Tenant make or permit any other work whatsoever that would directly or indirectly involve
the penetration or removal (whether permanent or temporary) of, or requi re access through, in,
under, or above any floor, wall or ceiling, or surface or covering thereof in the Premises.
5.6.3 Cost of Improvements . Landlord’s Initial Improvements shall be made at
Landlord’s sole cost and expense. Any additional improvements as approved by the Landlord, shall
be made at the Tenant’s sole expense including the expense of complying with all present and
future legal requirements, and any other work required to be performed in other areas within or
outside the Premises.
5.6.4 Compliance. All such Tenant’s Work shall be performed diligently and in a first
class workmanlike manner and in accordance with plans and specifications approved by Landlord,
and shall comply with all legal requirements. Any of Tenant’s Initial Improvements or other
alterations, including, without limitation, moveable partitions that are affixed to the Premise (but
excluding moveable, free standing partitions) and all carpeting, shall at once become part of the
Premises and the property of Landlord.
5.7 Right of Inspecti on. Landlord shall have the unfettered right at all reasonable times during the
Initial Term or any Renewal Term to enter the Premises for any reason whatsoever. Landlord
agrees, when able, to provide Tenant with reasonable notice of said entry upon the Premises. No
notice will be required in emergency situations or for access or entry upon the Premises.
VI. DESTRUCTION OR DAMAGE
6.1 If the Premises shall be damaged or destroyed during the term of this Lease by any casualty insured
under Landlord's standard fire and casualty insurance, Landlord shall, except as otherwise provided
in this Lease and subject to any delay or inability from causes beyond its control, repair and/or
rebuild the same substantially to what had been the condition thereof im mediately prior to such
damage or destruction.
6.2 If the Premises shall be damaged or destroyed to the extent of fifty percent (50%) or more of the
insurable value thereof, or if such casualty shall not have been insured against by Landlord's
standard fire and casualty policies, then Landlord or Tenant may terminate this Lease or elect to
repair such damage or rebuild the Premises. Within thirty (30) calendar days after any such
casualty, Landlord shall notify Tenant whether Landlord intends to repair or rebuild the Premises,
and Tenant shall notify Landlord whether Tenant intends to terminate this Lease. If Landlord elects
to repair or rebuild the Premises, Landlord shall perform such repair or rebuilding as provided in
this Agreement. If Landlord elects not to repair or rebuild, the Lease shall terminate without further
notice and all further obligations of both parties hereunder shall cease (other than those which shall
theretofore have accrued), effective as of the date on which Tenant ceases doing business on the
Premises.
6.3 If Landlord elects to repair the Premises and Tenant does not elect to terminate the Lease, and if
Landlord's repairs are not substantially completed within one hundred twenty (120) calendar days
following the date of the casualty, then Tenant, upon not less than thirty (30) calendar days written
notice to Landlord, may terminate this Lease if Landlord has not substantially completed such
22
Item 8.
Landlord Initials _______ Tenant Initials _______
4
repairs within the time period (which shall not be less than 30 calendar days) set forth in such
notice. Substantial completion, as used herein, shall mean that the Premises are restored to the
condition that they may be occupied and utilized for their intended purpose, notwithstanding that
there may be additional "punch list" or other non -essential items to be completed, which neither
affect not impact Tenant's use and enjoyment of the Premises. Nevertheless, Landlord shall
diligently pursue the completion of all remaining work in a timely manner.
6.4 During any period of reconstruction or repair of the Pre mises, provided Tenant has not elected to
terminate this Lease, Tenant may at its sole option continue the operation of Tenant's business in
the Premises to the extent reasonably practicable from the standpoint of good business practice.
Tenant shall not interfere with the repair or restoration activities of Landlord or its contractors, and
will adapt and modify its business activities as deemed necessary by Landlord to allow such repair
or restoration activities to continue expeditiously.
6.5 During any period in which, by reason of any damage or destruction not resulting from the
negligence of Tenant, Tenants employees, agents, or invitees, Tenant is unable to occupy all or a
portion of the Premises, Tenant’s rent shall be appropriately abated for that part of the Premises
rendered unusable for the conduct of Tenants business. Such abatement shall continue for the period
commencing with such destruction or damage and ending with the substantial completion by
Landlord of Landlord's repairs and/or rebuilding of the Premises, as described in this Lease.
VII. ASSIGNMENT AND SUBLETTING
The Tenant shall not, without the Landlord’s prior written consent: (i) mortgage, pledge, encumber,
or otherwise transfer (whether voluntarily, by operation of law, or otherwise) this Lease or any
interest hereunder; (ii) allow any lien to attach to Tenant’s interest in the Premises or this Lease; or
(iii) permit the use or occupancy of the Premises or any part thereof by anyone for a purpose other
than as set forth herein; . Any assignment or subletting of this Lease shall be at a reasonable rate
to cover minor maintenance without profit to the Tenant. Assignment of the Lease will not relieve
the Tenant or the Guarantors of their respective obligations under this Lease and Guaranty
Agreement unless otherwise agreed by Landlord in writing.
VIII. TERMINATION. This Lease shall end on the Termination Date. This Lease may be terminated
by Parties prior to the Termination Date upon providing a ninety (90) day notice to Tenant and/or
upon the occurrence of any default event as set forth in Section 8.
8.1 Termination for Convenience. The Parties agree that this Lease may be terminated by the Landlord
for convenience with a ninety (90) day written notice to the Tenant. Upon receipt of the notice,
Tenant shall surrender the Premises without any additional notice.
8.2 Surrender of Property. At the termination of this Lease, Tenant agrees to quit and deliver the
Premises peaceably and quietly to Landlord, or its attorney, or other duly authorized agent, at the
expiration or other termination of this Lease. The Tenant shall surrender the Premises in as good
state and condition as delivered to Tenant at the commencement of this Lease, reasonable use and
wear thereof expected.
IX. DEFAULT
9.1 Default by Tenant. The occurrence of any of the following shall constitute an event of default:
23
Item 8.
Landlord Initials _______ Tenant Initials _______
5
(a) The rent of any other sum of money payable under this Lease, whether to Landlord or
otherwise, is not paid within ten (10) days of the due date.
(b) Tenant’s interest in the Lease of the Premises shall be subjected to any attachment, levy, or
sale pursuant to any order or decree entered against Tenant in any legal proceeding and such
order or decree shall not be vacated within thirty (30) days of entry thereof; unless with respect
to any attachment, levy or sale, which cannot be vacated within thirty (30) days, Tenant in good
faith shall have commenced and thereafter shall continue to diligently pursue the vacation of
such order or decree by lawful means.
(c) Tenant breaches or fails to comply with any term, provision, condition, or covenant of this
Lease, other than the payment of rent, or with any of the rules and regulations now or hereafter
established from time to time by the Landlord to govern the operation of the building and such
breach or failure to comply is not cured within ten (10) days after written notice of such breach
or failure to comply is given to Tenant.
9.2 Remedies of Landlord. Upon the occurrence of an event of default by Tenant other than a failure
of Tenant to timely pay a sum that is due and payable, Landlord shall notify Tenant in writing of
the event of default, and Tenant shall, within twenty (20) days of receipt of such written notice cure
such event of default. Where the Tenant fails to cure such event of default within twenty (20) days
of receipt of the above-referenced written notice, Landlord shall have the option to do and perform
any one or more of the following in addition to, and not in limitation of, any other remedy or right
permitted by law or in equity or by this Lease. In electing to do any one or more of the following
courses of conduct, the Landlord must reasonably undertake its best efforts to properly mitigate
any damages caused or sustained by Landlord due to the occurrence of an event of defau lt by the
Tenant. The options and courses of conduct which may be undertaken by the Landlord in an event
of default by the Tenant are as follows:
(a) Landlord, with or without terminating this Lease, may immediately or at any time thereafter
re-enter the Pre mises and correct or repair any condition which shall constitute a failure on
Tenant’s part to keep, observe, perform, satisfy, or abide by any term, condition, covenant,
agreement or obligation of this Lease or of the rules and regulations adopted by the Landlord
or of any notice given Tenant by Landlord pursuant to the terms of this Lease, and Tenant shall
fully reimburse and compensate Landlord on demand for all reasonable expenses.
(b) Landlord, with or without terminating this Lease may immediately or at any time thereafter
demand in writing that Tenant immediately vacate the Premises whereupon Tenant shall
immediately vacate the Premises and, immediately remove therefrom all personal property
belonging to Tenant, whereupon Landlord shall have the right to immediately re-enter and take
possession of the Premises. Any such demand, re -entry and taking of possession of the
Premises by Landlord shall not of itself constitute an acceptance by Landlord of a surrender of
this Lease or of the Premises by Tenant an d shall not of itself constitute a termination of this
Lease by Landlord. In the event the Landlord re -enters and takes possession of the Premises
as provided above and the Tenant has failed upon request by Landlord to immediately remove
from the Premises all property belonging to or placed upon the Premises by the Tenant, the
Landlord shall have the right to have such property of the Tenant removed from the Premises
and reasonably be placed within a secure storage facility for a period of time not to exce ed
thirty (30) days, and all costs of handling, moving and storing such property of the Tenant shall
24
Item 8.
Landlord Initials _______ Tenant Initials _______
6
be paid by the Tenant. Notwithstanding any of the foregoing, Landlord shall be required to
comply with applicable South Carolina law regarding reentry and possession of the Premises.
(c) Landlord may immediately or at any time thereafter terminate this Lease, and this Lease shall
be deemed to have been terminated upon receipt by Tenant of written notice of such
termination; upon such termination Landlord shall recover from Tenant all damages Landlord
may suffer by reason of such termination including, without limitation, all arrearages in rentals,
costs, charges, additional rentals, and reimbursements, the cost (including court costs and
attorneys’ fees) of recovering possession of the Premises, and, in addition thereto, Landlord at
its election shall have and recover from Tenant either: (1) an amount equal to the excess, if any,
of the total amount of all rents and other charges to be paid by Tenant for the remainder of the
term of this Lease over the then reasonable rental value of the Premises for the remainder of
the Term of this Lease, or (2) the rents and other charges which Landlord would be entitled to
receive from Tenant if the Lease were not terminated. Such election shall be made by Landlord
by serving written notice upon Tenant of its choice of the alternatives within thirty (30) days
of the notice of termination. Notwithstanding anything hereunder to the contrary, Landlord
must use its reasonable best efforts to re-let the Premises and abate Landlord’s damages.
9.3 No Waiver. No course of dealing between Landlord and Tenant or any failure or delay on the part
of Landlord in exercising any rights of Landlord under any provisions of this Lease shall operate
as a waiver of any rights of Landlord, nor shall any waiver of a default on one occasion operate as
a waiver of any subsequent default or any other default. No express waiver shall affect any
condition, covenant, rule or regulation other than the one specified in such waiver and that one only
for the time and in the manner specifically stated.
9.4 No Election of Remedies . The exercise by Landlord of any right or remedy shall not prevent the
subsequent exercise by Landlord of other rights and remedies. All r emedies provided for in this
Lease are cumulative and may, at the election of Landlord, be exercised alternatively, successively,
or in any other manner, and all remedies provided for in this Lease are in addition to any other
rights provided for or allowed by law or in equity.
9.5 Insolvency or Bankruptcy. The appointment of a receiver to take possession of all or substantially
all of the assets of Tenant, or an assignment by Tenant for the benefit of creditors, or any action
taken or suffered by Tenant, or any action against Tenant, under any insolvency, bankruptcy, or
reorganization, shall at Landlord’s option constitute an event of default under this Lease. Upon the
happening of any such event of default or at any time thereafter, this Lease shall terminate five (5)
days after written notice of termination from Landlord to Tenant. In no event shall this Lease be
assigned or assignable by operation of law or by voluntary or involuntary bankruptcy proceedings
or otherwise and in no event shall this Lease or any rights or privileges hereunder be an asset of
Tenant under any bankruptcy, insolvency, or reorganization proceedings.
9.6 Abandonment. Tenant shall not be considered to have abandoned or vacated the Premises as long
as Tenant continues to pay rent and fulfill all other obligations of this Lease, regardless of whether
Tenant is actually continuously occupying the space or not, unless Tenant gives notice of
termination if and as allowed by this Lease. If Landlord's right of ent ry is exercised following
abandonment of the Leased Premises by Tenant, then Landlord may consider any personal property
belonging to Tenant and left on the Leased Premises to have been abandoned, in which case
25
Item 8.
Landlord Initials _______ Tenant Initials _______
7
Landlord may dispose of all such personal property in any manner Landlord shall deem proper and
is hereby relieved of all liability for doing so.
X. SALE OF PREMISES . In the event the Landlord hereunder, or any successor owner of the
Premises, shall sell or convey the Premises, all liabilities and obl igations on the part of the
Landlord, or such successor owner, under this Lease accruing thereafter shall remain for a
minimum sixty (60) days or the Tenant may enter into a new Lease with the successor owner.
XI. COMPLIANCE WITH LAWS. Tenant shall comply, at its own expense, with all statutes,
regulations, rules, ordinances and orders of any governmental body, department, or agency thereof
which apply to or result from Tenant’s use of the Premises.
XII. INSURANCE LIABILITY AND INDEMNIFICATION
12.1 Insurance Liability. Landlord has obtained Premise Liability Insurance, which does not cover
Tenant's possessions or Tenant's negligence. Tenant must obtain an Insurance Policy in an amount
of no less than $1,000,000 in commercial general liability and other appropriate policies to cover
damage or loss on the property or due to Tenant’s negligence , and to cover all of Tenant’s assets
stored or located on the Premises. Tenant shall name Landlord as an additional party on any and
all insurance policies and shall provide Landlord with a copy of all policies.
12.1.1 Tenant shall provide proof that payment for the insurance policy has been made initially
and thereafter and that the policy has been renewed at least fifteen (15) calendar days prior
to the anniversary of the initial year of this lease. Landlord may contact Tenant’s insurer(s)
or insurer(s)' agent(s) directly at any time regarding Tenant’s coverage, coverage amounts,
or other such relevant and reasonable issues related to this Lease.
12.2 Indemnity. To the extent permissible by law, the Tenant hereby agrees to indemnify and hold
harmless Landlord against and from any and all claims for property damage, or for personal injury,
arising out of or in any way arising out of Tenant's use of the Leased Premises or from any activity,
work, or thing done, permitted or suffered by Tenant in or about the Leased Premises. Tenant
agrees to include substantially similar terms as provided in this Section in any sublease agreement.
12.3 Liens. If any mechanic’s or other lien is filed against the Premises for work claimed to have been
for or materials furnished thereto, such lien shall be discharged by Tenant within Ten (10) days
thereafter, at Tenant’s expense by full payment thereof by filing a bond required by law. Tenant’s
failure to do so shall constitute a material default hereunder.
XIII. MISCELLANEOUS PROVISIONS
13.1 Notices. Any notice, communication, request, approval or consent which may be given or is
required to be given under the terms of this Agreement shall be in writing and shall be transmitted
(1) via hand delivery or express overnight delivery service to the Seller or the Purchaser, (2) via
facsimile with the original to follow via hand delivery or overnight delivery service, or (3) via e -
mail, provided that th e sending party can show proof of delivery, as the case may be, at the
addresses/numbers set forth below:
AS TO LANDLORD: Beaufort County
Attn: Beaufort County Administration
Post Office Box 1228
26
Item 8.
Landlord Initials _______ Tenant Initials _______
8
Beaufort, SC 29901
Copy To: Beaufort County
Attn: Beaufort County Public Facility Director
Post Office Box 1228
Beaufort, SC 29901
AS TO TENANT: Lowcountry Regional Transportation Authority
Attention: Administration
PO Box 209
25 Benton Field Drive
Bluffton, SC 29910
Copy To: Lowcountry Regional Transportation Authority
Attention: Administration
PO Box 209
25 Benton Field Drive
Bluffton, SC 29910
13.2 Entire Agreement. This Lease constitutes as the sole and entire agreement of Landlord and Tenant
and no prior or contemporaneous oral or written representations or agreements between the parties
affecting the Premises shall have any legal effect.
13.3 Counterparts. This Agreement may be executed in counterparts. Each of the counterparts shall be
deemed an original inst rument, but all of the counterparts shall constitute one and the same
instrument.
13.4 Severability. If any portion of this Lease shall be held to be invalid or unenforceable for any reason,
the remaining provisions shall continue to be valid and enforceable. If a court finds that any
provision of this Lease is invalid or unenforceable, then such provision shall be deemed to be
written, construed and enforced as so limited.
13.5 Amendment. This Agreement cannot be amended orally or by a single party. No amendmen t or
change to this Agreement shall be valid unless in writing and signed by both Parties to this
Agreement.
13.6 Captions. The captions used in this Lease are for convenience only and do not in any way limit or
amplify the terms and provisions hereof.
13.7 Successors and Assigns. The provisions of this Lease shall inure to the benefit of and be binding
upon Landlord and Tenant, and their respective successors, heirs, legal representatives, and assigns.
13.8 Applicable Law. The laws of the State of South Carolin a shall govern the interpretation, validity,
performance and enforcement of this Lease; and, of any personal guarantees given in connection
with this Lease.
27
Item 8.
Landlord Initials _______ Tenant Initials _______
9
13.9 Authority. Each individual and entity executing this Agreement hereby represents and warrants that
he, she or it has the capacity set forth on the signature pages hereof with full power and authority
to bind the party on whose behalf he, she or it is executing this Agreement to the terms hereof.
13.10 Force Majeure . Except for timely Rent payment, Landlor d or Tenant shall not be in default
hereunder when performance of any term or condition is prevented by a cause beyond its control.
13.11 Time is of the Essence. Time is of the essence of this Lease.
13.12 Quiet Enjoyment . Landlord hereby covenants, warrants and agrees that so long as Tenant is
performing all of the covenants and agreements herein stipulated to be performed on the Tenant’s
part, Tenant shall at all times during the lease term have the peaceable quiet and enjoyment and
possession of the Premises wi thout any manner of hindrance from Landlord or any person or
persons lawfully claiming the Premises, or any part thereof.
IN WITNESS WHEREOF, and in acknowledgement that the parties hereto have read and understood
each and every provision hereof, the Par ties have caused this Agreement to be executed on the date first
written above.
LANDLORD:
_____________________________ _____________________________
Witness Michael R. Moore
Beaufort County Administrator
_____________________________
Witness
TENANT:
_____________________________ _____________________________
Witness By: __________________________
Its: __________________________
_____________________________
Witness
28
Item 8.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
REQUEST TO PURCHASE (1) CAT 308 MINI HYDRAULIC EXCAVATOR ($154,771)
MEETING NAME AND DATE:
PUBLIC FACILITIES COMMITTEE – September 16, 2024
PRESENTER INFORMATION:
Jared Fralix, P.E. – ACA Engineering
Dave Wilhelm, P.E. – Interim PW Director (backup)
(10 Minutes)
ITEM BACKGROUND:
Stormwater is seeking approval to purchase a 2024 CAT Mini 308 Excavator as a replacement for
Asset 38347, a 2014 CAT Excavator that has accumulated 4,010 hours over its 10-year lifespan.
Blanchard CAT has provided a quote based on the 2024 Source well contract 020223-CAT
Cooperative Contract
PROJECT / ITEM NARRATIVE:
Purchase of 1 CAT 308 Mini Hydraulic Excavator
FISCAL IMPACT:
Blanchard CAT, a Source Well vendor, has provided a quote for a total amount of $154,771. The funding for
this item has been approved in the FY 2025 budget under the Stormwater account #5025-90-9020-54000.
STAFF RECOMMENDATIONS TO COUNCIL:
Beaufort County Fleet Manager recommends approving the procurement of a CAT Mini 308 Excavator to
replace the previously identified asset. This recommendation is founded on numerous factors, including the
potential to enhance operational efficiency, bolster safety measures, reduce maintenance costs, and increase
overall reliability to mitigate any potential downtime due to age and hours. With the Source well discount,
the cost of the new excavator will decrease from $201,577 to $154,271.
OPTIONS FOR COUNCIL MOTION:
Motion to either accept/deny the recommendation to approve the purchase of 1 CAT 308 MINI HYDRAULIC
EXCAVATOR.
Next Steps – Due to dollar amounts, this item does not require Council approval. Pending approval, staff will
execute purchase agreement.
29
Item 9.
Page 1 of 3
Vehicle Details Report
1 record Report generated on 08/27/2024 7:21 AM by Todd Franklin Davis
Filters
Vehicles: 38347
38347
Type Excavator Status Active
Year 2014 Fuel Type DIESEL/DEF
Current Meter 4,010.7 hours Current Meter Date 08/26/2024
Make CAT
Model CAT Excavator Mini 308 CR 54HP-9.2 VIN/SN CAT0308EJTMX00512
Group STORMWATER INFRASTRUCTURE 5025-90-9020-
Purchase
Purchase Date 04/11/2014
over 10 years ago
Purchase Price $109,354.00
Lifecycle Details
In-Service Date 04/11/2014 In-Service Hour Meter 1.0
Estimated Service Life in Months 120 Estimated Service Life in Meter Units 7000.0
Custom Fields
30
Item 9.
Page 2 of 3
Vehicle Specications
MSRP $154,771.00
Images
31
Item 9.
Page 3 of 3
Service Reminders
32
Item 9.
Quote 177825-01
Page 1 of 3
BEAUFORT COUNTY GOVERNMENT-
PUBLIC WORKS & MAINTENANC
120 SHANKLIN RD
BEAUFORT, SC 29906-8402
Attention: TODD DAVIS
Aug 19, 2024
Dear Todd,
We would like to thank you for your interest in our company and our products and are pleased to quote the following for your
consideration.
One (1) New Cat Model: 308 LA STR MINI HYDRAULIC EXCAVATORS with all standard equipment in addition to the
additional specifications listed below:
We wish to thank you for the opportunity of quoting on your equipment needs. This quotation is valid for 30 days, after which time we
reserve the right to re-quote. If there are any questions, please do not hesitate to contact me.
Sincerely,
Will Turbeville
Machine Sales Representative
STANDARD EQUIPMENT
OTHER STANDARD EQUIPMENT -Accumulator, certification -Caterpillar corporate ''one key'' system -Door locks on cab door and
external -enclosure doors -Lockable fuel cap -Beacon Socket -Ecology drain - engine -Radial seal engine air filter, double -element
with restriction indicator -Side by side engine & hydraulic oil -cooler -Hydraulic fluid temperature monitoring -Joystick travel and
steering mode -Travel cruise control -High definition hydraulics -- load sensing/flow sharing -Power on demand -Rear reflectors -Roll
over protective structure (ROPS) -(ISO 12117-2) -Product link elite lite (regulations -apply) -Auxiliary hydraulic lines: -- 1-way and
2-way (combined function) -- Auxiliary line quick disconnects -- In cab adjustable auxiliary flow -- Continuous flow -
FLUIDS -Hydro advanced hydraulic oil -Extended life coolant - 37C
OPERATOR ENVIRONMENT -Mounting bosses for front & top guard -Skylight -washer -Front post mounted windshield wiper &
-Utility space for mobile phone -Travel control pedals with hand levers -Seat, fabric, high back, suspension -Retractable seat belt
-Removable washable floor mat -Rear window emergency exit -integragted lower window -Openable front windshield with assist &
-Molded footrests -Mirror rear view - Cab left -Literature holder -LED interior light -Hydraulic lockout for all controls -Cup holder -- Jog
dial control interface -- Ground level wakeup switch -- Hour meter -- Multiple languages -- Numberic security code -- Performance &
machine adjustments -- Maintenance and machine monitoring -indicators -- Fuel level, coolant temp, & warning -Color LCD monitor:
-Coat hook -Automatic temp control -Air conditioner/heater with defroster & -Adjustable wrist rests -Ergonomic joysticks control levers
-Sealed and pressurized cab
ELECTRICAL -- Courtesy safety light -- Cab, boom left, front right -Work lights -Signaling/warning horn -Ignition key stop switch
-Circuit breaker -Battery disconnect -850 CCA maintenance free battery -90 ampere alternator -
HYDRAULICS -Hydro advanced hydraulic oil -Accumulator - certified -Hydraulic temperature monitoring -Power on demand -Load
sensing/flow sharing hydraulics -Variable displacement piston pump -Smart tech electronic pump -
UNDERCARRIAGE -Tie down eyes on track frame -Hydraulic track adjusters -Greased and lubricated track -
POWERTRAIN -Extended life coolant - 37C -Double element with warning indicator -Radial seal air filter -Fuel water seperator with
33
Item 9.
Quote 177825-01
Page 2 of 3
indicator -Automatic two speed travel -Automatic swing brake -Automatic engine shut-off -Automatic engine idle -Electronic engine,
turbo, DPF -Rated net power 55kW/72hp -ISO 9249/EEC 80/1270 -China NR III -US EPA Tier 4 Final/EU Stage V/ -CAT C3.3B diesel
engine
MACHINE SPECIFICATIONS
Description Reference No List
308 07A CR MHE DCA8E 637-9467 $185,890.00
DRAIN, ECOLOGY 382-8757 $0.00
HEATER, WATER JACKET 415-2556 $0.00
SEAT, AIR SUSP, FABRIC, HEATED 510-6070 $0.00
BELT, SEAT, 3'' RETRACTABLE 510-6085 $0.00
ALARM, TRAVEL 511-6157 $0.00
MONITOR NEXT GEN, ADVANCED, CR 511-6177 $0.00
LIGHTS, LED 511-6217 $0.00
CAMERA, REAR VIEW 511-6235 $0.00
ELECTRICAL ARR, C3.3 HRC 511-6253 $0.00
308 07A CR MINI EXCAVATOR 512-1401 $0.00
LINES, QC, LNG STK, 3 LINE 516-1613 $0.00
ENGINE, EPA TIER 4 FINAL 518-6184 $0.00
CONTROL, QC, 3 LINE 520-0778 $0.00
CAT KEY, WITH PASSCODE OPTION 522-6460 $0.00
COUNTERWEIGHT, EXTRA, 550LBS 525-6657 $0.00
SOFTWARE, PROPORTIONAL CONTROL 557-1709 $0.00
SOFTWARE, STICK STEER CONTROL 557-1710 $0.00
SOFTWARE, 2 WAY CONTROL 557-1711 $0.00
SOFTWARE, CODED START 557-1713 $0.00
STD BLADE, STD U/C, TG W/PAD 562-3698 $0.00
STICK, LONG 563-2071 $0.00
LINKAGE, BUCKET W/ LIFTING EYE 568-1567 $0.00
EOU HOUSE SWING COVER, 8T 605-3340 $0.00
PLUG GP 605-3339 $0.00
INTEGRATED RADIO V2 639-4467 $545.00
PRODUCT LINK, CELLULAR PLE643 557-5123 $0.00
THUMB,HYD + COUPLER,HYD, 8T 628-9997 $11,125.00
BUCKET-DC, 54'', 13.2 FT3, 7T 306-5662 $3,743.00
VL Access for 3 years
TOTAL LIST $201,577.00
DISCOUNT $-40,316.00
ADDITIONAL
DISCOUNT $-6,990.00
SELL PRICE $154,271.00
CSA Included
NET BALANCE DUE $154,271.00
SC SALES TAX $500.00
AFTER TAX BALANCE $154,771.00
34
Item 9.
Quote 177825-01
Page 3 of 3
WARRANTY
Standard Warranty: 24 Months/2000 Hours
CSA CFAS-2 YEARS/1,000 HOURS PARTS KIT, CAT FI NATIONAL OR
HYBRID CVA
ADDTITIONAL CONSIDERATIONS
2024 Sourcewell Caterpillar Cooperative Contract Discounts 20% off list 020223 - 032119-CAT
Accepted by___________________________________ on ____________________
______________________________
Signature
35
Item 9.
2024 Sourcewell Caterpillar Cooperative Contract Discounts by Model
Machine Model* New
Equipment
2024
Discount to Customer
(Off List Price)
Track Type Tractors Note
D1 23.00%
D1 Fire Dozer 23.00%
D2 23.00%
D2 Fire Dozer 23.00%
D3 23.00%
D3 Fire Dozer 23.00%
D4 23.00%
D5 23.00%
D5 Fire Dozer 23.00%
D6 23.00%
D7 19.00%
D8 19.00%
D9 One Time Only
D10 One Time Only
Wheeled Excavators
M314 26.00%
M315 26.00%
M316 26.00%
M317 26.00%
M318 26.00%
M320 26.00%
M322 26.00%
Material Handlers
MH3022 26.00%
MH3024 26.00%
MH3026 26.00%
MH3040 26.00%
MH3050 26.00%
MH3250 26.00%
MH3260 26.00%
Telehandlers
TH255 23.00%
TH408 24.00%
TL642 24.00%
TL943 24.00%
TL1055 24.00%
TL1255 24.00%
Motor Graders
120 34.00%
120GC 34.00%
140 30.00%
140GC 30.00%
150 30.00%
160 30.00%
14 19.00%
Skid Steer Loaders
226 21.00%
232 21.00%
236 21.00%
242 21.00%
246 21.00%
262 21.00%
272 21.00%
Compact Track Loaders
239 21.00%
249 21.00%
255 21.00%
259 21.00%
265 21.00%
279 21.00%
289 21.00%
299 21.00%
299XE Land Management 21.00%
Excavators
300.9 20.00%
301.5 20.00%
301.7 20.00%
301.8 20.00%
301.9 20.00%
302 20.00%
302.7 20.00%
303 20.00%
303.5 20.00%
304 20.00%
305 20.00%
306 20.00%
307.5 20.00%
308 20.00%
309 20.00%
310 20.00%
313 15.00%
313GC 16.00%
315 19.00%
315GC 20.00%
317 19.00%
317GC 20.00%
320 15.00%
320GC 16.00%
323 15.00%
325 15.00%
326 15.00%
330 15.00%
330GC 16.00%
335 15.00%
336 15.00%
340 16.00%
350 10.00%
352 10.00%
374 10.00%
395 10.00%
Non-Attached CAT OEM Work Tools are attachments sold on a standalone order without a machine purchase
Parts and Service is offered by the servicing dealer at local rates
Base machines must be properly configured with other mandatory and optional items from the price list before they are considered operational.
All new machines are subject to a commodity surcharge of up to 20% (In some cases, increased tire costs may cause this number to be greater)
All new attachments (CAT work tools) are subject to a commodity surcharge of up to 25%
Dealer costs (example: pre delivery inspection, assembly, freight to final location, etc.) are not subject to list discount
Attachments (CAT work tools) purchased with new machine on same invoice are subject to same list discount as machine
1 of 2
#Caterpillar: Confidential Green
36
Item 9.
Machine Model* New
Equipment
2024
Discount to Customer
(Off List Price)
Forest Machines
538 15.00%
548 15.00%
558 15.00%
568 15.00%
Backhoe Loaders
415 22.00%
416 22.00%
420 22.00%
428 Side Shift 22.00%
430 22.00%
432 Side Shift 22.00%
434 Side Shift 22.00%
440 22.00%
450 22.00%
Wheel Tractor Scrapers
621 18.00%
623 18.00%
627 18.00%
631 18.00%
637 18.00%
651 18.00%
657 18.00%
Articulated Trucks
725 17.00%
730 17.00%
735 17.00%
740GC 17.00%
745 17.00%
Rigid Frame Trucks
770 3.00%
773 3.00%
775 3.00%
Landfill Compactors
816 12.00%
826 12.00%
836 12.00%
Wheel Dozers and Soil Compactors
814 15.00%
815 13.00%
824 15.00%
825 13.00%
834 One Time Only
Wheel Loaders
903 23.00%
906 23.00%
907 23.00%
908 23.00%
910 23.00%
914 23.00%
920 24.00%
926 24.00%
930 24.00%
938 24.00%
950GC 20.00%
950 18.00%
962 18.00%
966GC 20.00%
966 15.00%
972 11.00%
980 11.00%
982 11.00%
988 11.00%
988GC 11.00%
Track Loaders
953 19.00%
963 22.00%
973 23.00%
Non-Attached CAT OEM Worktools 15.00%
Parts & Service N/A
Technology Solutions N/A
Caterpillar Safety Services 15.00%
Job Site Solutions N/A
2 of 2
#Caterpillar: Confidential Green
37
Item 9.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommendation of a Change Order to Davis & Floyd for RFP#092420TE Lady’s Island Access Roads Design
and Engineering ($556,644)
MEETING NAME AND DATE:
Public Facilities and Safety Committee – September 16, 2024
PRESENTER INFORMATION:
Jared Fralix, ACA – Infrastructure
(5 mins)
ITEM BACKGROUND:
March 3, 2021, Beaufort County entered a contract with Davis & Floyd for the design and engineering
of the 2018 One Cent Transportation Sales Tax projects known as the Lady’s Island Access Roads for
the amount of $2,518,136.52: $2,289,214.52 contract value with a contingency of $228,922. The
projects include Hazel Farm Road and S-7-497 Gay Drive, Lady’s Island Middle School Access Road, S-
7-186 Sunset Boulevard and S-7-187 Miller Drive West, Meadowbrook Drive Extension, Mayfair Court
Extension, and US 21 Airport Frontage Road Phase 2. As prior change orders have been executed
throughout the development of the projects, the contingency amount has been depleted and an
increase in the budget is being requested.
PROJECT / ITEM NARRATIVE:
Throughout the development of the projects, modifications have been needed to cover additional
work such as survey, stormwater investigation and design, public meeting participation, subsurface
utility engineering, utility coordination, and right of way acquisition that have changed from the
original scope of work. Staff has shifted project budgets from those on hold to those in development,
however; additional funds are needed to complete the contract for public involvement, right-of-way
appraisals and design, and final roadway design.
FISCAL IMPACT:
The change order request of $226,644 plus a contingency request of $330,000 bringing the total
increase to $556,644 and overall budget to $3,074,780.52 to complete the 4 projects mentioned
above. The additional contingency accounts for any unforeseen overages in right of way design as
acquisition begins and the development of final construction plans. The funding for this is the 2018
One Cent Transportation Sales Tax account 4705-80-0000-54500-LIMP with a balance of $20,639,776.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends the change order to Davis & Floyd for RFP#092420TE Lady’s Island Access Roads
Design and Engineering of $556,644.
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny the Recommendation of a Change Order to Davis & Floyd for RFP#092420TE
Lady’s Island Access Roads Design and Engineering of $556,644.
Move forward to County Council as the total contract budget increases to $3,074,780.52.
38
Item 10.
39
Item 10.
Lady’s Island Access Road Summary of new Modification and Suggested Contingencies
Revisions to January 2024 Mod
Public Involvement $40,000 PI was removed and now added back to scope. Two projects
completed and average about $10k each
ROW Appraisal
Adjustment
$107,000 $193,750 in savings was aggressive after discussing with
Michael Baker. Revised estimated saving of $86,750 ($193,750-
107,000) in savings using cost estimates instead of appraisals
Contingency $79, 644 Contingency was included in original mod but not included in
PO
Total Correction $226,644 New Mod for DF contract
Suggested Contingencies
Additional ROW
Design Effort
$70,000 Multiple ROW Plan review and comments on all projects with
DOT review still pending on 2 projects.
Final Roadway
Design
$110,000 Currently only have budget $75,000 for Final Roadway design
on all 4 projects. Preliminary and ROW plan production current
effort is $589,000 and still working through comments. This is
over 4 times what was originally estimated. Hopefully the work
put into ROW plans provide for quicker Final Design review
process and completion but we expect that the current budget
will not be enough.
Contingency $150,000 Suggest additional contingency (~5%)
Total Contingency $330,000 Contingency added to overall County budget (not DF contract)
40
Item 10.
1940 Algonquin Road, Suite 301 • Charleston, SC 29405
O: (843) 554-8602
WWW.DAVISFLOYD.COM
January 11, 2024
Brittanee Bishop
Program and Finance Manager
Beaufort County Engineering
104 Industrial Village, Building 3
Beaufort, SC 29906
Re: Lady’s Island Acce ss Road Projects
Proposal
D|F Job Number: 031946.00
Dear Brittanee,
As discussed, enclosed is the Lady’s Island Access Road project information regarding the current
design schedule, additional effo rt to date and proposed solutio n for completing the four roadway
projects. We appreciate the oppor tunity to work with you and t he Beaufort County Team on these
very important projects. Please do not hesitate to call with an y questions.
Yours truly,
D. Brice Urquhart, PE
Vice President | Transportation
Enclosures: Proposal
cc: Bryan Webb, PE, PTOE, RSP
21
Lindsey Keziah, PE
41
Item 10.
Lady's Island Access Roads MAM J J A S ON D J FMAM J J A S ON D J FMAM J J A S ON D J F
Mayfair Ct.
Project Removed from contract 7/2/22
MAM J J A S ON D J FMAM J J A S ON D J FMAM J J A S ON D J F
NTP 3/15/21
30% Plan Submittal 5/13/21
Comments Received 5/24/21
70% plans submitted 7/21/21
DOT comments received 9/23/21
70% Plan re-submittal 10/14/21
Intersection/Drainage Revisions 12/16/21
SCDOT comments received 5/25/22
Work stopped by County
MAM J J A S ON D J FMAM J J A S ON D J FMAM J J A S ON D J F
NTP 3/15/21
Boulevard alignment concept requested by County submitted 4/29/21
County requested regional pond scenario & Hazel alignment alternatives
30% Plan Submittal 6/8/21
30% Plan Comments received 7/15/21
Regional pond and outfall alternatives design
County requested rain garden options
County requested drainage options to avoid tree impacts on Hazel
Drainage Report Submitted 5/25/22
County Comments Received 6/1/22
County requested re-alignment of Hazel to match BHS 8/1/22
70% Plans submitted 10/24/22
70% Plan Comments Received 3/2/23
County requested re-evaluation of drainage to reduce the number of catch basins
70% Plan re-submittal 8/25/23
County requested removal of proposed pond 10/16/23
Comments received 11/5/23
SUP pavement changes, add survey labels, ped detour, 10' crosswalks, profile revisions for Hazel, re-analyze all pipe
capacity calcs, remove Hazel ditch and associated pipes, Lupo Drive outfall calcs
70% Plan Updates
MAM J J A S ON D J FMAM J J A S ON D J FMAM J J A S ON D J F
NTP 11/11/21
Survey
30% Plans submitted 4/5/22
Comments received 5/9/22
Ped Access to school, Robin Drive sidewalk, Cougar demo
70% Plans submitted 11/15/22
Comments received 1/24/23
Robin Drive SUE added 12/6/22
70% Plans re-submitted 4/27/23
Comments received 5/19/23
Remove "unnecessary" catch basins
70% Plans re-submitted 7/11/23
Comments received 7/25/23
cul-de-sac alignment/drainage changes, 5' sidewalk at US 21
70% Plans re-submitted 8/4/23
SCDOT comments received 10/2/23
Request clarification on SCDOT comment responses
Pause to determine if US 21 / Middle School intersection improvements should be added
70% Plan re-submittal 12/15/23
70% Plan Comments Received 1/2/24
70% Plan re-submittal 1/3/24
MAM J J A S ON D J FMAM J J A S ON D J FMAM J J A S ON D J F
Sidewalk/SUP and drainage outfall alternates
30% Plans submitted 9/30/21
County comments received 11/15/21
Drainage outfall alternates
Tech Memo #1 (8 alternatives submitted - 2 recommended for further review) submitted 4/27/22
County Comments received 5/19/22
Infiltration testing proposal submitted 7/14/22
Proposal Approved by County 8/8/22
Tech Memo #2 submitted 10/24/22
Tech Memo #2 review Meeting 12/20/22
Tech Memo #3 submitted 4/3/23
Drainage Design Meeting with County 9/5/23
70% Plans submitted 9/29/23
County comments received 12/1/23
70% Plan Updates
MAM J J A S ON D J FMAM J J A S ON D J FMAM J J A S ON D J F
NTP 8/9/22
30% Plans submitted 9/14/22
Comments received 12/27/22
70% Plans submitted 2/13/23
Comments received 4/6/23
Profile revisions, redesign stormwater to use only one trunk line & reduce number of catch basins
70% Plans re-submitted 5/26/23
Comments received 6/7/23
Ellipitcal pipes v. profile revisions
70% Plans re-submitted 6/30/23
Comments received 8/20/23
Revise/eliminate drainage easement, survey labels, profile revisions, additional survey needed from County to evaluate
need for easement and other possible drainage options (leveling pad etc.)
Design effort stopped pending receipt of additional survet from County (received 10/30/23)
70% Plans re-submitted 11/17/23
Comments received 12/18/23
Drainage revisions
70% Plans re-submitted 12/21/23
Lady's Island Access Roads Project Timeline
D|F Project 31946.00
Updated 1/11/24
Airport Frontage Road Phase II 2021 2022 2023 2024
Sunset Boulevard / Miller Drive W. 2021 2022 2023 2024
2024
Lady's Island Middle School Access Road 2021 2022 2023 2024
2024
Meadowbrook Drive 2021 2022 2023 2024
2021 2022 2023
Hazel Farms Road / Gay Drive 2021 2022 2023
42
Item 10.
Task D|F Project Budget D|F Effort To‐Date1
Budget Remaining
Project Management $15,715.63 $31,303.75 ($15,588.12)
Surveys $8,263.99 $9,518.87 ($1,254.88)
Utility Coordination $21,092.82 $12,662.50 $8,430.32
Preliminary Plan Design $16,249.99 $18,033.50 ($1,783.51)
Right‐of‐Way Plan Design $23,225.09 $30,131.25 ($6,906.16)
Hydraulic & Hydrologic Design $27,036.14 $38,291.00 ($11,254.86)
Public Involvement $7,120.33 $0.00 $7,120.33
Geotech/Pavement Design $1,482.58 $1,080.50 $402.08
Final Construction Plans $38,123.19 $93,015.50 ($54,892.31)
Landscape/Lighting Plans $8,743.29 $2,950.91 $5,792.38
Construction Bid Phase Services $7,550.04 $0.00 $7,550.04
Permitting $12,538.52 $6,772.00 $5,766.52
R/W Acquisition $5,259.99 $46.00 $5,213.99
Subsurface Utility Engineering (SUE) $1,482.58 $966.00 $516.58
Construction Phase Services $11,880.44 $0.00 $11,880.44
$205,764.62 $244,771.78
1. Effort through 1/6/24
Task Additional Effort by D|F
Project Management $15,588.12
Survey $3,082.50
Preliminary Plan Design $4,434.00
$2,055.00
$6,234.50
$7,319.00
$685.00
$6,850.00
$5,274.50
$411.00
$12,494.50
$14,710.00
$5,137.50
$5,480.00
$44,492.00
$134,247.62
* Effort after the initial R/W plan submittal has been charged to the Final Design Phase
R/W Submittal #1 (11/15/22)
R/W Submittal #3 (7/11/23)
R/W Submittal #4 (8/7/23)
Task D|F Project Budget D|F Effort To‐Date Remaining Budget Addn Sc ope to Date Remaining Effort
Project Management $15,715.63 $31,303.75 ($15,588.12) $15,588.12 $9,960.00
Surveys $8,263.99 $9,518.8 7 ($1,254.88) $3,082.50 $0.00
Preliminary and ROW Plan Design* $39,475.0 8 $141,180.25 ($101,705.17) $102,356.50 $20,204.00
Hydraulic & Hydrologic Design $27,036.1 4 $38,291.00 ($11,254.86) $13,220.50 $7,504.00
Contract Modification Request
* Includes Future DF final design of Stantec intersection improvements
Contract Modification Request
Requested Adjustments
$171,915.62
Design revisions requested by County
Additional Meetings, invoicing, schedule updates due to extended project timeline
Sidewalk and SUP Connectivity to School
Alignment revisions requested by County 1/21/22
Alignment Adjustments and addition of Stantec design elements
Sidewalk and SUP Connectivity to School
Two Drainage options submitted to County 5/11/22
Summary of Comments on R/W Plan Submittals
Add TOC profiles, revise drainage to reduce number of catch basins, modify sidewalk profiles
R/W Submittal #2 (4/27/23) R/W revisions on various tracts, easement revisions, driveway profile edits, requests to move CB/DI, update to reflect Stantec
design at US 21, NPDES revisions, cul‐de‐sac design revisions, edits to avoid tree impacts
Driveway profile updates, cul‐de‐sac design revisions, remove SUP at Cougar/US 21 and add sidewalk add R/W for drainage
structures, modify fill slopes to minimize tree impacts
Construction staging (alignment between LIMS and Gay Drive + US 21 modifications)
Final Design Plans1
Revisions based on comments from R/W submittal #1 (11/15/22 ‐ 5/11/23)
Revisions based on comments from R/W submittal #2 (5/11/23 ‐ 7/11/23)
Revisions based on comments from R/W submittal #3 (7/25/23 ‐ 8/4/23)
Revisions based on comments from other projects (8/4/23 ‐ 10/2/23)
Revisions based on SCDOT comments (staging, turn lane revisions, ISD, etc.) (10/2/23 ‐ 12/16/23)
Revisions based on SCDOT comments (staging, turn lane revisions, etc.) (10/2/23 ‐ 12/16/23)
Hydraulic & Hydrologic Design
Revisions to address comments on Preliminary Plan Submittal 4/5/22R/W Plan Design
Drainage revisions based on comments from R/W submittal #1 (1/24/23 ‐ 4/27/23)
Drainage revisions based on comments from R/W submittal #2 (5/19/23 ‐ 7/11/23)
Additional Services Analysis
Lady's Island Middle school (31946.00 Phase 4000)
43
Item 10.
Staff
Engineer II Engineer II Engineer III ENGINEER VI ENGINEER VII
Additional Services Through 1/6/24 $105.00 $137.00 $168.00 $184.00 $231.00
0001 Project Management Additional meetings (12 progress meetings in scope) + Monthly invoices/summary reports + Project Coordination $15,588.12
0002 Survey Additional Survey to tie to school sidewalk 22.50 22.5 0 $3,082.50
0004 Preliminary Design Shift aligment of LIMS/US 21 for 0 degree offset 12.00 17.25 29.2 5 $4,434.00
Alignment Adjustments and addition of Stantec design elements 15.00 15.00 $2,055.00
Revisions to address comments on Preliminary Plan Submittal 4/5/22 44.50 0.75 45.25 $6,234.50
Sidewalk and SUP Connectivity to School 41.00 9.25 50.25 $7,319.00
Two Drainage options submitted to County 5/11/22 5.00 5.00 $685.00
Drainage revisions based on comments from R/W submittal #1 (1/24/23 ‐ 4/27/23) 50.00 50.00 $6,850.00
Drainage revisions based on comments from R/W submittal #2 (5/19/23 ‐ 7/11/23) 38.50 38.50 $5,274.50
Revisions based on SCDOT comments (staging, turn lane revisions, etc.) (10/2/23 ‐ 12/16/23) 3.00 3.00 $411.00
Revisions based on comments from R/W submittal #1 (11/15/22 ‐ 5/11/23) 86.50 3.50 90.00 $12,494.50
Revisions based on comments from R/W submittal #2 (5/11/23 ‐ 7/11/23) 102.00 4.00 106.00 $14,710.00
Revisions based on comments from R/W submittal #3 (7/25/23 ‐ 8/4/23) 37.50 37.50 $5,137.50
Revisions based on comments from other projects (8/4/23 ‐ 10/2/23) 40.00 40.00 $5,480.00
Revisions based on SCDOT comments (staging, turn lane revisions, ISD, etc.) (10/2/23 ‐ 1/8/24) 242.00 36.00 28.75 306.75 $44,492.00
On‐going ‐ Remaining Services 839 $134,247.6 2
0001 Project Management Additional Project Management Services to Complete Project 24.00 24.00 48.00 $9,960.00
0005 R/W Plan Design Additional Comments/Response from SCDOT Review ‐ Add Stantec Design to DF Final Design 80.00 32.00 16.00 4.00 132.00 $20,204.00
0006 H&H Additional Comments/Response from SCDOT Review & Final Drain age Report 40.00 12.00 4.00 4.00 60.00 $7,504.00
1. Effort after the initial R/W plan submittal has been charged to the Final Design Phase 240 $37,668.0 0
Total $171,915.6 2
Task
Lady's Island Middle school (31946.00 Phase 4000)
Additional Services Analysis
DF CostTotal Hours
0009 Final Design1
D|F 2019 Rev 2 Rate Table Used for Cost Calculations (in place at time of contract)
0006 H&H
Task
0005 R/W Plan Design
44
Item 10.
Task D|F Project Budget D|F Effort To‐Date1
Budget Remaining
Project Management $15,715.63 $23,030.31 ($7,314.68)
Surveys $6,406.51 $6,648.19 ($241.68)
Utility Coordination $32,984.74 $15,058.76 $17,925.98
Preliminary Plan Design $10,793.83 $11,971.75 ($1,177.92)
Right‐of‐Way Plan Design $20,057.30 $48,608.25 ($28,550.95)
Hydraulic & Hydrologic Design $21,182.44 $95,020.00 ($73,837.56)
Public Involvement $7,120.33 $0.00 $7,120.33
Geotech/Pavement Design $3,199.69 $1,402.50 $1,797.19
Final Construction Plans $20,626.53 $70,649.50 ($50,022.97)
Landscape/Lighting Plans $9,161.36 $1,176.91 $7,984.45
Construction Bid Phase Services $7,550.04 $0.00 $7,550.04
Permitting $11,189.63 $2,290.00 $8,899.63
R/W Acquisition $13,498.03 $1,450.50 $12,047.53
Subsurface Utility Engineering (SUE) $1,482.58 $332.75 $1,149.83
Construction Phase Services $13,061.17 $0.00 $13,061.17
Traffic Signal $3,171.90 $1,581.50 $1,590.40
$197,201.71 $279,220.92
1. Effort through 1/6/24
Task Additional Effort by D|F
Project Management $7,314.68
Survey $1,516.00
Preliminary Plan Design $5,725.00
R/W Plan Design $16,222.50
$4,202.00
$16,602.00
$4,291.00
$9,001.00
$25,490.75
$9,515.50
$34,416.25
$10,017.75
$144,314.43
* Effort after the initial R/W plan submittal has been charged to the Final Design Phase
30% Submittal (6/8/21)
R/W Submittal #1 (10/20/22)
Contract Modification Request
Requested Adjustments
Task D|F Project Budget D|F Effort To‐Date Remaining Budget Addn Sc ope to Date Remaining Effort
Project Management $15,715.63 $23,030.3 1 ($7,314.68) $7,314.68 $9,960.00
Surveys $6,406.51 $6,648.19 ($241.68) $1,516.00 $0.00
Preliminary Plan and ROW Plan Design $30,851.13 $131,229.5 0 ($100,378.37) $66,381.50 $14,964.00
Hydraulic & Hydrologic Design $21,182.4 4 $95,020.00 ($73,837.56) $69,102.25 $14,544.0 0
Contract Modification Request $183,782.43
Additional Services Analysis
Drainage analysis/design for rain garden, revise spread calculations and check to see if quantity of catch basins can be reduced, updated
pond details, bioretention pond analysis
R/W Submittal #2 (8/25/23) Re‐assess spread calculations and inlet placement, additional analysis for ditches, revise crosswalk/ramp widths, modify road profile, revise
Starbuck's access per revised drawings.
Final Plans1
Revisions based on comments from other roadway submittals
Revisions based on comments from R/W submittal #1 (3/23/23 ‐ 8/25/23)
Hazel Farms Road / Gay Drive (31946.00 Phase 3000)
Drainage updates based on County's direction to remove detention pond / Staging with LIMS
Summary of Comments on Plan Submittals
Move SUP to follow road and not avoid trees, move R/W limits to standard offset from shoulder break, consider rain gardens
Design revisions requested by County
Additional Meetings, invoicing, schedule updates due to extended project timeline
Additional survey for Hazel Farm alignment options, bioswale, new stormwater pond
Regional Pond, Boulevard Concept, and Hazel Farm Alignment Alternatives (3/15/21 ‐ 6/8/21)
R/W revisions, alignment updates, Starbucks updates (4/15/21 ‐ 10/24/22)
Regional Pond / Raingarden Alternatives (3/15/21 ‐ 6/8/21)
Regional Pond / Raingarden Alternatives (6/8/21 ‐ 9/22/21)
Detention alternatives between SUP and trees (9/22/21 ‐ 10/19/21)
Drainage updates based on additional pond survey and alignment revisions (9/15/21 ‐ 1/6/22)
Drainage updates based on comments on Drainage Report (6/1/22 ‐ 8/25/23)
Hydraulic & Hydrologic Design
45
Item 10.
Staff
Engineer II Engineer II Engineer III ENGINEER VI ENGINEER VII
Additional Services Through 1/8/24 $105.00 $137.00 $168.00 $184.00 $231.00
0001 Project Management Additional Meetings, invoicing, schedule updates due to extended project timeline $7,314.68
0002 Survey Additional survey for Hazel Farm alignment options, biosw ale, new stormwater pond 2.50 5.75 0.50 8.75 $1,516.00
0004 Preliminary Design Regional Pond, Boulevard Concept, and Hazel Farm Alignment Alternatives (3/15/21 ‐ 6/8/21) 3.00 18.50 15.00 0.50 37.00 $5,725.00
0005 R/W Plan Design R/W revisions, alignment updates, Starbucks updates (4/15/21 ‐ 10/24/22) 11.00 89.50 15.25 104.75 $16,222.50
Regional Pond / Raingarden Alternatives (3/15/21 ‐ 6/8/21) 10.75 8.00 4.00 22.75 $4,202.00
Regional Pond / Raingarden Alternatives (6/8/21 ‐ 9/22/21) 33.50 77.50 4.00 8.50 1.00 91.00 $16,602.00
Detention alternatives between SUP and trees (9/22/21 ‐ 10/19/21) 6.50 24.50 1.50 26.00 $4,291.00
Drainage updates based on additional pond survey and alignment revisions (9/15/21 ‐ 1/6/22) 28.00 27.00 10.50 3.25 40.75 $9,001.00
Drainage updates based on comments on Drainage Report (6/1/22 ‐ 8/25/23) 112.25 72.50 20.50 93.00 $25,490.75
Drainage updates based on County's direction to remove detention pond / Staging with LIMS 46.00 31.00 0.50 1.50 33.00 $9,515.50
Revisions based on comments from R/W submittal #1 (3/23/23 ‐ 8/25/23) 8.00 178.25 54.50 232.75 $34,416.25
Revisions based on comments from other roadway submittals 67.75 4.00 71.75 $10,017.75
On‐going ‐ Remaining Services 761.50 $144,314.43
0001 Project Management Additional Project Management Services to Complete Project 24.00 24.00 48.00 $9,960.00
0005 R/W Plan Design Finalize Remaining Changes/Additional Comments/R esponse from SCDOT Review 40.00 40.00 10.00 4.00 94.00 $14,964.00
0006 H&H Finalize Remaining Changes /Additional Comments/Response fro m SCDOT Review & Final Drainage Report 60.00 40.00 10.00 4.00 114.00 $14,544.00
1. Effort after the initial R/W plan submittal has been charged to the Final Design Phase 256 $39,468.0 0
Total $183,782.4 3
Task
Hazel Farms Road / Gay Drive (31946.00 Phase 3000)
Additional Services Analysis
Final Design10009
DF CostTotal HoursD|F 2019 Rev 2 Rate Table Used for Cost Calculations (in place at time of contract)
Task
H&H0006
46
Item 10.
Task D|F Project Budget D|F Effort To‐Date1
Budget Remaining
Project Management $15,715.73 $27,019.06 ($11,303.33)
Surveys $6,406.50 $6,450.00 ($43.50)
Utility Coordination $32,984.65 $7,774.25 $25,210.40
Preliminary Plan Design $11,608.39 $21,086.25 ($9,477.86)
Right‐of‐Way Plan Design $24,858.33 $29,397.00 ($4,538.67)
Hydraulic & Hydrologic Design $27,162.49 $90,502.25 ($63,339.76)
Public Involvement $7,120.33 $0.00 $7,120.33
Geotech/Pavement Design $1,482.58 $1,585.50 ($102.92)
Final Construction Plans $23,613.28 $47,296.00 ($23,682.72)
Landscape/Lighting Plans $11,965.02 $0.00 $11,965.02
Construction Bid Phase Services $7,550.03 $0.00 $7,550.03
Permitting $11,189.65 $414.00 $10,775.65
R/W Acquisition $21,512.48 $0.00 $21,512.48
Subsurface Utility Engineering (SUE) $1,482.58 $390.50 $1,092.08
Construction Phase Services $13,061.18 $0.00 $13,061.18
Traffic Signal $3,171.90 $0.00 $3,171.90
$220,885.12 $231,914.81
1. Effort through 1/6/24
Task Additional Effort by D|F
Project Management $11,303.33
$548.00
$1,918.00
$5,548.50
R/W Plan Design $2,603.00
$20,498.00
$13,769.00
$23,353.75
$16,519.25
$24,200.50
$120,261.33
* Effort after the initial R/W plan submittal has been charged to the Final Design Phase
30% Submittal (9/30/21)
R/W Submittal #1 (9/29/23)
Task D|F Project Budget D|F Effort To‐Date Remaining Budget Mod Req uest Remaining Effort
Project Management $15,715.73 $27,019.0 6 ($11,303.33) $11,303.33 $9,960.0 0
Preliminary and ROW Plan Design $36,466.72 $97,779.25 ($61,312.53) $51,337.25 $20,444.0 0
Hydraulic & Hydrologic Design $27,162.49 $90,502.25 ($63,339.76) $57,620.75 $20,844.0 0
Contract Modification Request
Sunset Boulevard / Miller Drive W. (31946.00 Phase 5000)
Contract Modification Request
Hydraulic & Hydrologic Design
Design effort to avoid/minimize tree impacts
Final Plans1
Design updates to reflect County comments received 12/6/23
Revised ROW plans to reflect drainage updates
Preliminary Plan Design
Additional Services Analysis
$171,509.33
Design revisions requested by County
Additional Meetings, invoicing, schedule updates due to extended project timeline
Review additional Survey and evaluate drainage options
Address Comments on 30% Design Plans
Address Comments on 30% Design Plans
Drainage Alternatives/Tech Memo #1 (11/15/21 ‐ 4/27/22)
Infiltration Analysis/Tech Memo #2 (4/28/22 ‐ 10/24/22)
Tech Memo #3 (10/25/22 ‐ 4/3/23)
Summary of Comments on Plan Submittals
revised driveways to drop curb type, added tree labels, added sidewalk shading, roundabout updates
R/W revisions, drainage revisions, SUP alignment revisions, modifications to minimize tree impacts
Requested Adjustments
47
Item 10.
Staff
Engineer II Engineer II Engineer III ENGINEER VI ENGINEER VII
Additional Services Through 1/6/24 $105.00 $137.00 $168.00 $184.00 $231.00
0001 Project Management Additional Meetings, invoicing, schedule upda tes due to extended project timeline $11,303.33
Review additional Survey and evaluate drainage options 4.00 4.00 $548.00
Design effort to avoid/minimize tree impacts 14.00 14.00 $1,918.00
Address Comments on 30% Design Plans 40.50 40.50 $5,548.50
0005 RW Plan Design Address Comments on 30% Design Plans 19.00 19.00 $2,603.00
Drainage Alternatives/Tech Memo #1 (11/15/21 ‐ 4/27/22) 99.00 3.7 5 30.50 3.00 136.25 $20,498.00
Infiltration Analysis/Tech Memo #2 (4/28/22 ‐ 10/24/22) 70.5 19. 50 7.75 11.75 1.00 110.5 0 $13,769.00
Tech Memo #3 (10/25/22 ‐ 4/3/23) 81.75 52.50 28.00 10.50 172.75 $23,353.75
Revised ROW plans to reflect drainage updates 20 53.25 9.00 30.50 1 12.75 $16,519.25
Design updates to reflect County comments received 12/4/23 138.7 5 6.50 145.25 $24,200.50
On‐going ‐ Remaining Services 755 $120,261.3 3
0001 Project Management Additional Project Management Services to Com plete Project 24.00 24.00 48.00 $9,960.00
0005 R/W Plan Design Finalize Remaining Changes/Additional Comments/R esponse from SCDOT Review 80.00 40.00 10.00 4.00 134.0 0 $20,444.00
0006 H&H Finalize Remaining Changes /Additional Comments/Response fro m SCDOT Review & Final Drainage Report 120.0 0 40.00 10.00 4.00 174.0 0 $20,844.00
1. Effort after the initial R/W plan submittal has been charged to the Final Design Phase 356 $51,248.0 0
Total $171,509.3 3
Task
Preliminary Design0004
H&H0006
0009 Final Plans1
Sunset Boulevard / Miller Drive W. (31946.00 Phase 5000)
Additional Services Analysis
DF CostTotal HoursD|F 2019 Rev 2 Rate Table Used for Cost Calculations (in place at time of contract)
Task
48
Item 10.
Task D|F Project Budget D|F Effort To‐Date1
Budget Remaining
Project Management $12,597.59 $16,930.25 ($4,332.66)
Surveys $4,169.55 $1,166.50 $3,003.05
Utility Coordination $1,542.77 $0.00 $1,542.77
Preliminary Plan Design $7,225.18 $8,089.00 ($863.82)
Right‐of‐Way Plan Design $10,900.29 $47,293.50 ($36,393.21)
Hydraulic & Hydrologic Design $16,338.22 $25,153.50 ($8,815.28)
Public Involvement $0.00 $0.00 $0.00
Geotech/Pavement Design $1,482.59 $828.00 $654.59
Final Construction Plans $11,955.27 $18,082.25 ($6,126.98)
Landscape/Lighting Plans $5,290.11 $1,052.30 $4,237.81
Construction Bid Phase Services $7,550.03 $0.00 $7,550.03
Permitting $7,283.11 $368.00 $6,915.11
R/W Acquisition $2,083.73 $1,083.00 $1,000.73
Construction Phase Services $11,674.57 $0.00 $11,674.57
$100,093.01 $120,046.30
1. Effort through 1/16/24
Task Additional Effort by D|F
Project Management $4,332.66
Preliminary Plan Design $3,039.50
$13,280.50
$15,743.50
$5,959.50
$5,274.50
$5,480.00
$2,329.00
Final Design Plans
1 $16,801.25
$72,240.41
* Effort after the initial R/W plan submittal has been charged to the Final Design Phase
30% Submittal Comments (9/14/22)
R/W Submittal #2 (5/26/23)
R/W Submittal #3 (6/30/23)
Task D|F Project Budget D|F Effort To‐Date Remaining Budget Addn Sc ope to Date Remaining Effort
Project Management $12,597.5 9 $16,930.25 ($4,332.66) $4,332.66 $9,960.00
Preliminary and ROW Plan Design $18,125.4 7 $73,464.75 ($55,339.28) $60,098.75 $5,352.0 0
Hydraulic & Hydrologic Design $16,338.2 2 $25,153.50 ($8,815.28) $7,809.00 $7,156.00
Contract Modification Request
Airport Frontage Road (31946.00 Phase 6000)
R/W Submittal #1 (2/13/23) Change project name, add typical sections, revise drainage to reduce the number of catch basins, redesign drainage for only one
trunk line
revise profile to eliminate eliptical pipe, R/W adjustments
Design speed questions, ISD comments, revise text sizes, revise drainage to include spreader pad
Hydraulic & Hydrologic Design
Summary of Comments on R/W Plan Submittals
Revise Taco Bell driveway, adjust wiudth of grass buffer, add sidewalk
Address comments on 70% plan submittal 3 (8/20/23 ‐ 11/17/23)
R/W Plan Design1
Additional Services Analysis
Requested Adjustments
Contract Modification Request
$94,708.41
Design revisions requested by County
Additional Meetings, invoicing, schedule updates due to extended project timeline
New survey + Design revision from "T" intersection to curved roadway
Address comments on 30% plans (12/27/22 ‐ 2/13/23)
Address comments on 70% plan submittal 1 (3/15/23 ‐ 5/26/23
Address comments on 70% plan submittal 2 (6/7/23 ‐ 6/30/23)
Address comments on 70% plan submittal 3 (8/20/23 ‐ 11/17/23)
Address comments on 70% plan submittal 1 (3/15/23 ‐ 5/26/23
Address comments on 70% plan submittal 2 (6/7/23 ‐ 6/30/23)
49
Item 10.
Staff
Engineer II Engineer II Engineer III ENGINEER VI ENGINEER VII
Additional Services Through 1/8/24 $105.00 $137.00 $168.00 $184.00 $231.00
0001 Project Management Additional Meetings, invoicing, schedule upda tes due to extended project timeline $4,332.66
0004 Preliminary Design New survey + Design revision from "T" intersection to curved roadway 19.50 2.00 21.50 $3,039.50
Address comments on 30% plans (12/27/22 ‐ 2/13/23) 82.50 10.75 93.25 $13,280.50
Address comments on 70% plan submittal 1 (3/15/23 ‐ 5/26/23 103.50 8.50 112.00 $15,743.50
Address comments on 70% plan submittal 2 (6/7/23 ‐ 6/30/23) 43.50 43.50 $5,959.50
Address comments on 70% plan submittal 3 (8/20/23 ‐ 11/17/23) 38.50 38.50 $5,274.50
Address comments on 70% plan submittal 1 (3/15/23 ‐ 5/26/23 40.00 40.00 $5,480.00
Address comments on 70% plan submittal 2 (6/7/23 ‐ 6/30/23) 17.00 17.00 $2,329.00
0009 Final Design1 Address comments on 70% plan submittal 3 (8/20/23 ‐ 12/21/23) 79.25 19.50 14.50 113.25 $16,801.25
On‐going ‐ Remaining Services 479 $72,240.4 1
0001 Project Management Additional Project Management Services to Com plete Project 24.00 24.00 48.00 $9,960.00
0005 R/W Plan Design Additional Comments/Response from SCDOT Revie w 10.00 10.00 10.00 2.00 32.00 $5,352.00
0006 H&H Additional Comments/Response from SCDOT Review & Final Drain age Report 24.00 16.00 4.00 44.00 $7,156.00
124 $22,468.0 0
1. Effort after the initial R/W plan submittal has been charged to the Final Design Phase
Total $94,708.4 1
Airport Frontage Road (31946.00 Phase 6000)
Additional Services Analysis
DF CostTotal HoursD|F 2019 Rev 2 Rate Table Used for Cost Calculations (in place at time of contract)
Task
Task
0005
0006 H&H
R/W Plan Design
50
Item 10.
Meadowbrook Drive (Remaining Funds) $154,925.87
Public Involvement $7,120.33
Sub Budgets ‐ Will not be used $15,410.85
Public Involvement $7,120.33
Sub Budgets ‐ Will not be used $42,126.06
Public Involvement $7,120.33
Sub Budgets ‐ Will not be used $35,005.73
Assume 50 of 100 Appraisals are not needed $193,750.00
(Each Appraisal and Review = $3875)
Remaining Contract Contingency $79,644.37
Total $542,223.87
LIMS $171,915.62
Hazel Farm / Gay $183,782.43
Sunset/ Miller $171,509.33
Airport Road $94,708.41
Total $621,915.79
Total Additional Effort $621,915.79
Total Potential Funding Available ‐$542,223.87
Estimated Additional Funding Needed $79,691.92
Additional Effort
ROW Acquisition
Lady's Island Access Road Projects
Potential Areas of Available Funding withn Current Contract
LIMS
Hazel Gay
Sunset Miller
51
Item 10.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Recommend Approval of a transfer of funds between airport accounts and a Contract Award to Gulf Stream
Construction for IFB#081424 Beaufort County Executive Airport Sitework Construction Services
MEETING NAME AND DATE:
Public Facilities and Safety Committee -September 19, 2024
PRESENTER INFORMATION:
Hank Amundson , Special Assistant to the Administrator & Jared Fralix, ACA Infrastructure (5 minutes)
ITEM BACKGROUND:
In the original Ordinance, from early 2022, accepting and planning the use of ARPA funds, Council allocated
$1,500,000 for use by the Airports. The Airport staff and Board planned the use of these funds for the
construction of additional hangars at Beaufort Executive Airport. Planning and design for the site has proven
to be more intense and has taken longer than anticipated. This effort will require the use of additional Airport
funds in order to complete the site work. This site work makes the vertical construction possible.
PROJECT / ITEM NARRATIVE:
The Beaufort County Executive Airport plans to expand its hangar capacity by adding three new hangar
buildings and one existing building expansion to increase its hangar capacity to house approximately 23
additional airplanes. IFB#081424 was issued on July 11, 2024. It was open for 30 days. Bids were due August
26, 2024 due to a slight weather delay. Three bids were received. All three bids were responsive. Gulf Stream
Construction was the lowest responsive bidder. Staff recommends the awarding this contract to perform
prescribed and designed site to Gulf Stream Construction in the amount of $2,081,619.74.
FISCAL IMPACT:
Funding will consist of the remaining $1,313,900 of the allocated ARPA funds (Acct# 2330-10-0000-59100 ) and
the difference of $ 788,593.69 will be covered by the Airports’ Pooled Cash Account (Acct# 5400-90-0000-
10400) once the transfer is approved and executed. Current Balance in the Pooled cash account from which
the transfer is funded is $2,102,493.69 .
STAFF RECOMMENDATIONS TO COUNCIL:
Staff Recommends approval of a transfer of funds from Hilton Head Airport Pooled Cash Acct to the Beaufort
Executive Airport Capital Account in the amount of $800,000 and the awarding of the site work Contract to
Gulf Stream Construction for Award of IFB #081424 in the Amount of $1,982,494.99 plus Contingency of 5%
($99,124.75) for a total of $2,081,619.74
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny recommendation of award to Gulf Stream Construction for IFB #081424 Beaufort
Executive Airport Hangar Expansion Sitework Construction Package.
Next Step: Move forward to County Council to award to Gulf Stream Construction for IFB #081424 Beaufort
Executive Airport Hangar Expansion Sitework Construction Package.
52
Item 11.
PRELIMINARY BID TABULATION
PURCHASING DEPARTMENT
Project Name:
Beaufort Executive Airport Hangar
Expansion - Civil Construction
Project Number: IFB 081424
Project Budget:
Bid Opening Date: 26-Aug-24
Time: 3:00:00 PM
Location: Beaufort County
Bid Administrator: Dave Thomas
Bid Recorder: Victoria Moyer
The following bids were received for the above referenced project:
BIDDER
BID
FORM
ALL
ADDENDA
Bid
Bond
SCH OF
VALUES SMBE Docs Sub Listing Grand Total Price
Cleland X X X X
Self
Performing
Self
Performing
2,547,083.36$
Total
45,995.00$ Alternates Fire Hydrant
Assembly & Connection
Gulf Stream X X X X X X $ 1,982,494.99 Total
(45,000.00)$
Alternates Stockpile
Excess Soils Onsite in
Lieu of Hauling Off.
Quality Enterprises X X X X X X 4,602,700.00$ Total
39,300.00$ Alternates Fire Hydrant.
Bid Administrator Signature Bid Recorder
Beaufort County posts PRELIMINARY bid tabulation information within 2 business days of the advertised bid opening. Information on the PRELIMINARY bid tabulation is
posted as it was read during the bid opening. Beaufort County makes no guarantees as to the accuracy of any information on the PRELIMINARY tabulation. The bid
results indicated here do not necessarily represent the final compliance review by Beaufort County and are subject to change. After the review, the final award will be
made by Beaufort County Council and a certified bid tab will be posted online.
8/26/2024
53
Item 11.
GULF STREAM
54
Item 11.
55
Item 11.
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMEND APPROVAL of Contract Award to Gulf Stream Construction for IFB#072224 Beaufort County
Government Center (New Arthur Horne) Parking Lot Project ($880,546.77)
MEETING NAME AND DATE:
Public Facilities and Safety Committee – August 19, 2024
PRESENTER INFORMATION:
Robert Gecy, Project Manager Capital Projects (5 mins.)
ITEM BACKGROUND:
In August of 2023 this project was initially put out for bid with a budget of $900,000 and received 2 bids in the
amount of $929,015 and $1,128,426. Due to infrastructure delays, the demolition of the Old Arthur Horne
Building and Parking Lot project were put on hold. Additional funding of $228,426 was requested for FY25 to
allow for possible increases in materials and labor. The project was put back out for bid and on July 29th we
received 2 bids in the amount of $688,000 and $880,546.77. The low bidder (who previously bid $1,128,426
in 2023) was disqualified due to improper licensing and Gulf Stream Construction was chosen at $880,546.77.
PROJECT / ITEM NARRATIVE:
This project is the final construction phase of the New Arthur Horne Building Complex. The second half of the
Old Arthur Horne Building was demolished in May 2024 and the new parking lot will be constructed on the
now vacant site. It will add 45 new parking spaces and sidewalks to the existing overcrowded parking lot
shared by the Sheriff’s Dept, Detention Center and Arthur Horne Building.
FISCAL IMPACT:
The contract fee is for materials and construction in the amount of $ 880,546.77. Staff recommends a 10%
contingency of $88,054.67, bringing the project’s total cost to $968,601.44. The funding for this project will be
from the 2020 General Obligation Bond - Buildings and Renovations with account number 4012-80-0000-54420
and a balance of $3,418,226.00.
STAFF RECOMMENDATIONS TO COUNCIL:
Staff recommends approval to award Gulf Stream Construction for IFB #072224 Beaufort County Government
Center (New Arthur Horne) Parking Lot in the amount of $880,546.77 with a contingency of 10% (88,054.67)
for a total request of $968,601.44
OPTIONS FOR COUNCIL MOTION:
Motion to approve/deny recommendation to award Gulf Stream Construction for IFB#072224 Beaufort County
Government Center (New Arthur Horne) Parking Lot Project
Next Step: Move forward to County Council to award Gulf Stream Construction for IFB#072224 Beaufort
County Government Center (New Arthur Horne) Parking Lot Project on August 26, 2024.
56
Item 12.
24'-0" 54'-0"18'-0"
RIBAUT ROAD
RAMP RAMP
24'-0"
9'-0" 54'-0"54'-0"
36'-0" 13'-0" 36'-0" 8'-0" 24'-0" 19'-0"
18'-0" 22'-0" 8'-0" 22'-0" EXIST
EXIST
15'-2"12'-0" 54'-0" 30'-10"
21'-6" 36'-0" 9'-0" 36'-0" 21'-6"
RAMP
RAINGARDEN
39'-4" (VIF)
7'-0"
24'-4"
RAIN GARDEN
8'-0"8'-0"
RAMP
12
10
11
12
13
16
17
18
19
30 31
36
9
6
7
40 35
345
8
15
14
2928
32
33
34
10'-0"12'-0"
18'-0" 18'-0"
5'-0"
20
21
22
23
26 272524
41
42
43 37
19'-0"
38
39
44
45
COUNTYEMPLOYEEONLY COUNTYEMPLOYEEONLY COUNTYEMPLOYEEONLY
R10'-0" R10'-0"
2'-2"27'-6"
2INNPT FITTING
2INNPT FITTING
1-1/2INNPT FITTING
4INNPT FITTING
1-1/2INNPTFITTING
2INNPT FITTING
2INNPT FITTING
2INNPT FITTING
14'-3"5'-5"
19'-0"
19'-0"
SHEET KEY NOTES:1.EXISTING CONCRETE SIDEWALK TO REMAIN. REFER TO CIVIL DRAWINGSFOR ADDITIONAL INFORMATION2.NEW CONCRETE SIDEWALK3.EXISTING GENERATOR TO REMAIN4.TRANSFORMER LOCATION SERVING NEW OFFICE BUILDING5.DUMPSTER6.EXISTING SIDEWALK TO BE REMOVED7.MASONRY SCREEN WALL TO MATCH BUILDING8.EXISTING ELECTRICAL POLE WITH 1,500 Kv OVERHEAD POWER LINES9.NOT USED10.EXISTING LIGHT POLE11.EXISTING TELECOMMUNICATIONS MANHOLE12.STOP SIGN13.6" STEEL BOLLARD14.NOT USED15.LIGHT POLE W/ TWO (2) LIGHT FIXTURES. SEE DETAIL A5 / A-20216.STORM SEWER INLET TO COORDINATE WITH LIGHT POLES17.25' CONCRETE APRON IN FRONT OF DUMPSTER ENCLOSURE18.EV CHARGING STATION, COUNTY EMPLOYEE ONLY (NOT FOR PUBLIC USE)19.CONNECT NEW LIGHT FIXTURES TO NEAREST ADJACENT PARKING LOTLIGHT CIRCUIT OR TO TRANSFORMER. NEW PARKING LOT LIGHT TO BEPHOTOCELL ACTIVATED20.4" EV CHARGING STATION PAD TO BE COORDINATED WITH COUNTYPROVIDED CHARGING STATIONS. SEE DETAIL A6 / A-10221.(4) EXISTING, 4" BURIED TELECOMMUNICATIONS CONDUIT. FIELD VERIFYLOCATION PRIOR TO BEGINNING WORK22.APPROXIMATE LOCATION OF EXISTING ELECTRICAL SERVICE. FIELDVERIFY LOCATION PRIOR TO BEGINNING WORK
GENERAL NOTES:A.THIS DRAWING AND DRAWING AC-101 ARE SUPPLEMENTARY TOTHE CIVIL DRAWINGS. IN THE EVENT OF CONFLICT THE MORERESTRICTIVE CONDITION RULES
EXISTING 3-STORY COUNTY OFFICE BUILDINGNEW ASPHALT PAVING
EXISTING TREE TO BE REMOVED. REMOVE STUMP INITS ENTIRETY AND BACKFILL
EXISTING PALMETTO TREE TO BE PROTECTED
NEW PERVIOUS CONCRETE PAVING
STORM SEWER INLET
LEGEND:
LANDSCAPING SHOWN ON THIS PLANIS FOR REFERENCE ONLY SEE SHEETAL-101 FOR LANDSCAPING PLANCONTRACTOR SHALL SURVEY ANDBE AWARE OF EXISTING 115KvPOWER LINES ALONG RIBAUT ROAD.IT IS THE CONTRACTOR'SRESPONSIBILITY TO CONFIRM ALLSETBACKS WITH SCE&G PRIOR TOSTARTING ANY WORK. IT IS ALSO THECONTRACTOR'S RESPONSIBILITY TOCOMPLY WITH ALL APPLICABLEOSHA REQUIREMENTSTHE CONTRACTOR IS RESPONSIBLEFOR LOCATING ALL UNDERGROUNDUTILITIES BEFORE BEGINNING WORK
SOD (ZOYSIA)
VEHICLE CHARGING STATIONS:1.THE CONTRACTOR IS RESPONSIBLE FOR THE ELECTRIC VEHICLECHARGING STATION CONCRETE PAD (SHOWN IN MORE DETAIL ONDRAWING A-102) AND FOR INSTALLATION OF THREE (3) 4" SCHEDULE 40ELECTRICAL (GRAY) CONDUIT FROM THE PAD TO THE EXISTINGTRANSFORMER (NORTH OF THE RAIN GARDEN)2. PROVISION AND INSTALLATION OF THE CHARGING STATIONS WILL BE BYOTHERS, UNDER A SEPARATE CONTRACT3.THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE OWNER’SCHARGING STATION SPECIFICATIONS AND INSTALLATION DETAILS ANDFOR COORDINATING WITH THE CHARGING STATION VENDOR ANDINSTALLER4.EACH CONDUIT IS TO BE STUBBED UP THROUGH THE CHARGING STATIONCONCRETE PAD (BEHIND THE CHARGING STATIONS)5.CONDUIT WILL HAVE TO BE RUN UNDER THE NEW PARKING LOT TO AVOIDCONFLICTS WITH EXISTING UNDERGROUND UTILITIES BETWEEN THEEXISTING A. HORNE BUILDING AND THE EXISTING GENERATOR. EACHCONDUIT RUN IS ONE HUNDRED AND EIGHTY (180) LINEAR FEET6.CONDUIT ARE TO BE BURIED A MINIMUM OF 18" DEEP AND SHALL BEPROVIDED WITH RED, "CAUTION BURIED ELECTRIC" DETECTABLE BURIALTAPE. PROVIDE 5" GALVANIZED, 36" SWEEPS FOR TIE-IN AT THE EXISTINGTRANSFORMER7.THE OWNER'S ELECTRIC VEHICLE CHARGING STATION CONTRACTOR ISRESPONSIBLE FOR INSTALLING THE CHARGING STATIONS, PULLING WIRETHROUGH THE CONDUIT, CONNECTION OF THE CHARGING STATIONS ANDCONNECTION TO THE EXISTING TRANSFORMER8.ALL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLEREQUIREMENTS OF THE INTERNATIONAL BUILDING CODE AND THENATIONAL ELECTRICAL CODE9. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTINGBURIED UTILITY LINES
PARKING LOT LIGHTING:1.THE CONTRACTOR SHALL WIRE THE TWO (2) NEW PARKING LOT LIGHTSTO THE EXISTING TRANSFORMER. WIRING SHALL BE INSTALLED IN 4"SCHEDULE 40 ELECTRICAL (GRAY) CONDUIT2.THE TOTAL CONDUIT RUN FROM THE TRANSFORMER AND THEN BETWEENTHE LIGHTS IS THREE HUNDRED AND FIFTEEN (315) LINEAR FEET3.CONDUIT ARE TO BE BURIED A MINIMUM OF 18" DEEP AND SHALL BEPROVIDED WITH RED, "CAUTION BURIED ELECTRIC" DETECTABLE BURIALTAPE. PROVIDE 5" GALVANIZED, 36" SWEEPS FOR TIE-IN AT THE EXISTINGTRANSFORMER4.WIRE SIZE SHALL BE BASED ON THE REQUIREMENTS OF THE LIGHTFIXTURE SUBMITTED BY THE CONTRACTOR5.ALL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLEREQUIREMENTS OF THE INTERNATIONAL BUILDING CODE AND THENATIONAL ELECTRICAL CODE6.THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTINGBURIED UTILITY LINES
SHEET INFORMATION
CONSTRUCTIONFOR
REVISIONS / SUBMISSIONS
GOVERNMENTCOMPLEXBEAUFORT COUNTY
NEW PARKING LOT104 RIBAUT ROADBEAUFORT, SC 29902
Copyright © 2024 Beaufort Design Build, LLC
BEAUFORT2 Fire Station LaneSeabrook, SC 29940CHARLOTTE7315 Swansea LaneCornelius, NC 28031(843) 466-3664info@beaufortdesignbuild.comwww.beaufortdesignbuild.com
A2NEW PARKING LOT PLAN010'20' 5'15' 1" = 10'-0"
NEW PARKING LOTPLAN
A-101
1
14
2
66
2
710
8
1
1
1
35
B2A-201A2A-201
C2A-201
8
11
2
1
1
1
2
15
15
A-102C2
A-102A2
16
17
18 1818
6
2
19
1
TOTAL SPACES:45 ACCESSIBLE SPACES: 2 ELECTRICAL VEHICLE CHARGING3 PARKING STALL: 9'-0"x18'-0"DRIVE AISLE:22'-0" WIDEASPHALT PAVED AREA:7,606.00 SFPERVIOUS CONCRETE PAVED AREA:7,525.00SF TOTAL CONCRETE PAVED AREA(CURB, GUTTER AND SIDEWALK):2,919.00 SF
PARKING DATA:
22
22
22
22
57
Item 12.
PRELIMINARY BID TABULATION
PURCHASING DEPARTMENT
Project Name:
Beaufort County Government Center New
Parking Lot
Project Number: IFB 072224
Project Budget:
Bid Opening Date: July 29 2024
Time: 3:00:00 PM
Location: Beaufort County
Bid Administrator: Dave Thomas
Bid Recorder: Victoria Moyer
The following bids were received for the above referenced project:
BIDDER
BID
FORM
ALL
ADDENDA
Bid
Bond
SCH OF
VALUES
SMBE
Docs Sub Listing Grand Total Price
CP&G Construction X X X X X X
688,000.00$
30,000.00$
Deduct Alternate 1
Gulf Stream Construction X x X X X X
880,546.77$
149,086.54$ Deduct Alternate 1
Bid Administrator Signature Bid Recorder
Beaufort County posts PRELIMINARY bid tabulation information within 2 business days of the advertised bid opening. Information on the PRELIMINARY bid
tabulation is posted as it was read during the bid opening. Beaufort County makes no guarantees as to the accuracy of any information on the PRELIMINARY
tabulation. The bid results indicated here do not necessarily represent the final compliance review by Beaufort County and are subject to change. After the review,
the final award will be made by Beaufort County Council and a certified bid tab will be posted online.
7/29/2024
58
Item 12.
COUNTY COUNCIL OF BEAUFORT COUNTY
CAPITAL IMPROVEMENTS DEPARTMENT
100 Ribaut Road
Post Office Drawer 1228
Beaufort, South Carolina 29901-1228
Monday, August 5, 2024
Attn: Victoria Moyer
Deputy Director
Beaufort County Procurement Services
104 Industrial Village Rd
Suite 3
Beaufort, SC 29906
Via email: victoria.moyer@bcgov.net
RE: Recommended Disqualification of CP&G Construction - IFB 072224 - Beaufort C ounty
Government Center New Parking Lot
Victoria,
It has been brought to my attention that CP&G Construction does not hold the proper license to
perform the construction for IFB 072224 - Beaufort County Government Center New Parking Lot .
According to the SC Dept of Labor and Licensing, CP&G holds a BD -4 General Contractor
classification. This classification, according to the SC Code of Laws Section 40-11-410, “includes
commercial, industrial, institutional, modular, and all other types of building construction,
including residential structures. This license classification includes all work under the
subclassifications of Wood Frame Structures, Nonstructural Renovation, Masonry, Pre -
engineered Metal Buildings, Roofing, Structural Framing, and Miscell aneous Metals. ” In
addition, according to Section 40-11-340 - Qualifications for acting as sole prime contractor: the
contractor “may act as a sole prime contractor on a project if forty percent or more of the work
as measured by the total cost of construction falls under one or more of the licensee's license
classifications or subclassifications.” Since there is no building associated with this project, and
the BD-4 classification does not cover Asphalt Paving(AP) or Concrete Paving(CP) classifications,
CP&G is not licensed to perform the work.
Aside from CP&G Construction not being properly licensed, I was immediately concerned with such
a low bid of $688,000 after they (CP&G) had previously bid $1,152,638 in 2023. With no change in
scope for this project, there should not have been a differenc
e of almost $465,000 in cost 10
months later. This variance was observed as a red flag of oversight and/or error. Coupled withthe
lack of proper licensing, this bid has been disqualified.
Hank Amundson, Director - (843) 255-2707 – Carolyn Wallace, Manager
59
Item 12.
Page 2 of 2
CO
UNTY COUNCIL OF BEAUFORT COUNTY
CAPITAL IMPROVEMENTS DEPARTMENT
100 Ribaut Road,Post Office Drawer 1228
Beaufort, South Carolina 29901-1228
Robert Gecy
I
t is my recommendation that we proceed with awarding the contract to the next lowest bidder, Gulf
Stream Construction, with a bid of $880,546.77. We consider this amount to be fair and reasonable.
The bid amount is less than the two previous bids received in 2023 of $929,015 and $1,128,426
(from CP&G), and well within the approved budget of $1,152,638.72. Gulf Stream Construction is a
large and very reputable company based out of Charleston, SC that has been in business for almost
60 years, with additional offices in Pooler, GA to support the Savannah/Beaufort area. I feel confident
in choosing them to complete this project.
I
f you have any questions, please contact me at (843) 255-2709 or robert.gecy@bcgov.net
S
incerely,
R
obert G. Gecy
Project Manager
Beaufort County Capital Projects
CC: H
ank Amundson
File
60
Item 12.
BID DOCUMENTS
Beaufort County Government Center New Parking Lot
IFB 072224
Prepared by: Beaufort County Procurement Services
Dated: June 18, 2024
Bid Due Date: July 22, 2024
61
Item 12.
IMPORTANT ELECTRONIC SUBMITTAL INSTRUCTIONS
In order to do business with the Beaufort County, vendors must register with P rocurement
Services through our Vendor Registration system, powered by Vendor Registry. The County may
reject any quotes, bids, proposals and qualifications submitted by businesses that are not
registered. Registering also allows businesses to identify the type of goods and services they
provide so that they may receive email notifications regarding relevant solicitations out for bid.
To register with the County, go to www.beaufortcountysc.gov a nd go to the Procurement
Services Department’s page and click on Vendor Registration. Once registered you may submit
your proposal through the solicitation section in Vendor Registry.
IMPORTANT
ELECTRONIC SUBMITTAL REQUIREMENTS
Response submittals for this Request for Proposal will ONLY be received electronically and
must be submitted ONLINE prior to the date and time listed on page 1 of this IFB document.
All responses must adhere to the following guidelines:
- Suppliers are encouraged to submit responses as soon as possible. Responses are received
into a ‘lockbox’ folder and cannot be opened prior to the due date and time. The time and date
of receipt as recorded by the server will serve as the official time of receipt. The County is not
responsible for late submissions, regardless of the reason.
- All requested information and forms MUST be uploaded as one file if possible. Each submission
must be inclusive of all forms. If necessary to have more than one upload, pricing and signed
acknowledgements, etc. are to be in the first upload and the MSDS should be in the second,
with each titled accordingly. If you have a problem with your upload, you may contact Vendor
Registry at 844-802-9202 or cservice@vendorregistry.com
TO BE INCULUDED IN YOUR BID PACKAGE:
BID FORM THRU BID SCHEDULE
CONTRACTORS QUALIFICATION STATEMENT SMALL AND MINORITY BUSINESS
PARTICIPATION
ALL OTHER PAGES SHALL REMAIN PART OF THE BID
BY REFERENCE AND IT IS NOT NECESSARY TO RETURN THESE ITEMS.
62
Item 12.
COUNTY COUNCIL OF BEAUFORT COUNTY
Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and Consultants
It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as “Beaufort County” or “the
County”, to comply with Title VI of the 1964 Civil Rights Act (Title VI) and its related statutes. To this end, Beaufort County
gives notice to all Prime Contractors, Subcontractors, Architects, Engineers, and Consultants that the County assures full
compliance with Title VI and its related statues in all programs, activities, and contracts. It is the policy of Beaufort County
that no person shall be excluded from participation in, denied t he benefit of, or subjected to discrimination under any of its
programs, activities, or contracts on the basis of race, color, national origin, age, sex, disability, religion, or language
regardless of whether those programs and activities are Federally funded or not.
Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to
Prime Contractors, Subcontractors, Architects, Engineers, and Consultants, may not discriminate on the basis of race, color,
national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-
tier subcontractors may not discriminate in their election and retention of second- tier subcontractors, including those who
supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in
connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT)
and/or the Federal Highway Administration (FHWA).
In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County
to be performed under a subcontract, including procurements of materials or leases of equipment, each potential
subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under the contract and
the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability,
religion, or language by providing such a statement in its bidding and contract documents.
Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant
thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may
be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations,
orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails
or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort
County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance
with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may
determine to be appropriate, including, but not limited to:
• Withholding of payments to the Contractor under the contract until the Contractor complies, and/or
• Cancellation, termination, or suspension of the contract, in whole or in part.
In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of
this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests
of USDOT and FHWA. Additionally, the Contractor may request the United States to enter into such litigation to protect the
interests of the United States.
Any person or Subcontractor who believes that they have been subjected to an unlawful discriminatory practice under Title
VI has a right to file a formal complaint within one hundred eighty (180) days following the alleged discriminatory action.
Any such complaint must be filed in writing or in person:
Beaufort County Procurement Services
Attn: Dave Thomas – email: dthomas@bcgov.net – phone: 843-255-2304
Rev 12-14
63
Item 12.
THIS IS NOT AN ORDER
Dates Advertised: June 18, 2024
INVITATION
FOR BID
(Bid number)
FORMAL SEALED BID (X) REQUEST FOR QUOTE ( )
We require bids to be electronically submitted through our Vendor Registry
Program. Please go to www.BeaufortCountySC.gov and sign up to submit
your bid.
*BIDS WILL BE RECEIVED UNTIL 3:00 P.M.
LOCAL TIME ON:
July 22, 2024
Bid No.
IFB 072224
BID TITLE: Beaufort County Government Center New Parking Lot
PREBID CONFERENCE: MANDATORY A Pre-Bid conference will be held on June 2, 2024 at 2:00 p.m. at
the Beaufort County Administration Building located at 100 Ribaut Rd. Beaufort SC 29902 . We will meet in Council
Chambers then proceed to a site visit.
David L. Thomas, CPPO
Purchasing Director
SUBMIT QUESTIONS TO:
Vendor Registry
VENDOR NAME REASON FOR NO BID
VENDOR MAILING ADDRESS
Amend Number(s) Received:
CITY-STATE-ZIP-CODE S.C. TAX NO.
Telephone Number ( ) FEDERAL I.D. OR SOCIAL SECURITY NO.
Toll-Free Number ( )
Fax Number ( )
I certify that this bid is made without prior understanding,
agreement, or connection with any corporation, firm or any
corporation, firm, or person submitting a bid for the same
materials, supplies, or equipment, and is in all respects fair
and without co llusion or fraud. I agree to abide by all
conditions of this bid and certify that I am authorized to sign
this bid for the bidder.
AUTHORIZED SIGNATURE (MANUAL)
AUTHORIZED SIGNATURE (TYPE/TITLE
Bid Security is attached (if required) in the amount of: 5% of Bid if over $30,000.00.
A Bid Tabulation Will Be Posted On Vendor Registry After Bid Opening
BID ACCEPTANCE AND DELIVERY (Prices bid must be firm for a minimum of 90 days). In compliance with the Invitation, and subject to all conditions thereof, the above
signed offers and agrees, if this bid is accepted within (90) days from date of opening, to furnish any or all items quoted on at prices as set forth after the item and to make
delivery within (120) days after receipt of order with transportation cost included and prepaid. Unless otherwise stated and accepted herein, I agree to complete this
proposed contract in less than one hundred twenty (120) calendar days after issue date of purchase order.
I M P O R T A N T
IF YOU CONSIDER THESE SPECIFICATIONS AS RESTRICTIVE,
SEE GENERAL PROVISIONS, PARAGRAPH #20, DISCREPANCIES.
* Bids received after the time specified for opening cannot be considered
64
Item 12.
5
PROJECT SUMMARY
Project Title: Beaufort County Government Center, New Parking Lot
Project Descriptions
This Project provides a new forty-five (45) space parking lot on the Beaufort County Government Center
Campus between the new Arthur Horne Office Building and the existing Law Enforcement Center. The
Project will provide parking for County Employees and visitors. Additionally, the Project provides parking
lot lighting, a new masonry screen wall around an existing generator, a dumpster pad end enclosure,
landscaping and irrigation.
Scope of Work
Work includes earthwork, asphalt and pervious paving, concrete sidewalks, curb and gutter, storm water
structures and piping, pavement markings, signage, site lighting, landscaping and irrigation. The
generator and dumpster enclosure includes reinforced concrete footings, reinforced masonry, brick veneer,
galvanized metal gates, reinforced concrete pd and vehicle apron and steel pipe bollards. As required, site
utilities will be relocated by the Owner prior to the start of construction.
Alternate Bid Items:
Deduct Alternate 01: Provide the deductive price to remove the generator screen wall, dumpster screen
wall, gates and dumpster pad and replace them with concrete curb and gutter and plants as shown on
Drawing A-102 alt.
Project Administration: Beaufort County Capital Projects Department
Contract Type: Lump Sum, General Contractor (BD5).
Contract Time: One hundred and twenty (120) calendar days.
Liquidated Damages: $500.00 per calendar day.
65
Item 12.
6
BID INVITATION
IFB 072224
Sealed bids submitted via Vendor Registry will be received electronically until 3:00 p.m. July 22, 2024 at
which time responses to this request will be recorded in the presence of one or more witnesses in the
Procurement Services Department. A Bid Tab will be posted on Vendor Registry for:
Beaufort County Government Center, New Parking Lot
A MANDATORY PRE-BID conference will be held on July 2, 2024 at 2:00 p.m. at the Beaufort County
Administration Building located at 100 Ribaut R d. Beaufort SC 29902. We will meet in the Council
Chambers then proceed to a site visit.
Bid documents are available on the Beaufort County website at www.beaufortcountysc.gov. To obtain
these documents you must be a registered vendor with Beaufort County.
Beaufort County reserves the right to reject all proposals and to waive minor informalities and
irregularities.
All Bids shall be accompanied by a Bid Bond drawn in favor of the Beaufort County Treasurer of Beaufort
County, Beaufort, South Carolina, in the amount of at least five percent (5%) of the bid for the complete
work: such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract
and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for
Beaufort County, South Carolina. Each bond shall be equal one hundred percent (100%) of the contract
amount. A copy of the Bid Bond or Certified Check must be electronically sent with your bid documents
through Vendor Registry. The original Bid Bond or Certified Check must be received by the Procurement
Services Department within 10 days after the bid due date. Failure on the bidder’s part to provide a copy
of the Bid Bond or Certified Check by the Bid closing date and time will be considered as a nonresponsive
bid and rejected by the County. The Bid Bond shall be forfeited to the County Council of B eaufort
County, South Carolina as liquidated damages if the Bidder fails to execute the contract and provide
Performance and Payment Bonds within fourteen (14) days after being notified that he has been awarded
the Contract.
The successful bidder shall secure and pay for necessary approvals, permits, assessments, and changes
required for the construction and installation of this project as required by local, state, and federal
regulations. County permits shall be required as applicable, but the fee shall be waived.
This waiver shall apply to the Beaufort County permit fee only and not to any "City or Town" permit fee
and/or licenses, when applicable.
Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti -Kickback Act, the Contract
Work Hour Standard Act, and the National Occupational Safety and Health Act of 1970.
Bidders must certify that they do not and will not maintain or provide for their employees any facilities,
which are segregated on the basis of race, color, creed, or national origin.
The Beaufort County Council reserves the right to reject all Bids and waive any formalities. Any claims
for cost incurred by any bidders in preparation of any part of, or total package for this project will not be
66
Item 12.
7
handled for reimbursement by Beaufort County or their representatives.
The Bidder is required to submit only the Bid documents, which include:
1. Invitation for Bid Form
2. Bid Form
3. Bid Bond or Certified Check
4. Consent of Surety
5. Certification by Contractor RE: Non-Segregated Facilities
6. Non-Collusion Affidavit of Prime Bidder
7. Contractors Qualification Statement
8. Certifications Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion
9. Local Vendor Preference – Participation Affidavit
10. Self-Performance Affidavit – As Applicable
11. Good Faith Efforts Checklist
12. Non-Discrimination Statement
13. Pricing
The Bidding Documents consist of the following, including all addenda issued there with and forms
referenced therein, in addition to the drawings:
a. Bid Documents
b. Contract
c. General Conditions
d. Supplemental Conditions
e. General Provisions
f. Special Provisions
g. Specifications
Bid opening will be held at the Procurement Services Department. There will be no Public Bid
Opening. A Bid Tabulation will be posted on Vendor Registry
67
Item 12.
8
INSTRUCTIONS TO BIDDERS
1. DEFINED TERMS
Terms used in these Instructions to Bidders, which are defined in the General Conditions and
Supplementary Conditions have the meanings assigned to them therein.
2. CONTRACT DOCUMENTS
2.1 Bidder should verify that the Contract Documents are complete in the number of documents as
indicated by the List of Documents, and in the number of pages in each document.
2.2 Bidder must use a complete set of Contract Documents in preparing Bid; neither Owner nor
Engineer assume any responsibility for errors or misinterpretations resulting from the use of an incomplete
set of Contract Documents.
2.3 Bidder has the responsibility prior to submitting Bid to examine the Contract Documents
thoroughly and notify the Engineer of all conflicts, errors or discrepancies, or of questions or meaning or
intent. Bidder is encouraged to visit the construction site prior to submitting a Bid.
2.4 Addenda may be issued to modify the Contract Documents in response to notifications made by
Bidders, or for other reasons. Addenda will be posted on Vendor Registry at least five days prior to Bid
opening. If addenda are required to post less than five calendar days prior to Bid Opening, then it shall be
the responsibility of the Bidder who considers that the issued addenda does not provide sufficient time to
address the Bid, notify the owner, by phone and in writing of the need to delay the Bid Opening. The owner
shall then notify all prospective bidders via email and on Vendor Registry of the revised Bid Opening
Date.
2.5 Bidders shall check Vendor Registry to verify the number, if any, of Addenda issued.
3. ORGANIZATION OF CONTRACT DOCUMENTS
3.1 The Bid form contains understandings and representations made by Bidder in submitting the Bid;
in addition, the Schedule of Items is included.
3.2 The form of Notice of Award and Agreement, which may be executed by the Owner with the
Successful Bidder, is incorporated in the Contract Documents.
3.3 The General Conditions incorporated in the Contract Documents are the STANDARD
GENERAL CONDITIONS OF THE BEAUFORT COUNTY, SOUTH CAROLINA
CONSTRUCTION CONTRACT
3.4 The actual amendments or supplements to the Standard General Conditions are made in the
Supplementary Conditions by reference to the specific article or paragraph so amended or supplemented.
The Supplementary Conditions may also contain additional paragraphs incorporating language required
by South Carolina contract law.
3.5 The General Requirements of the Specifications contain additional amendments and supplements
to the Standard General Conditions of the Construction Contract with regard to general and administrative
matters and contain details for the Work of this Contract.
3.6 The Technical Requirements of the Specifications may cover a breakdown of the Goods and/or
Service by Sections; solely for reference and payment, and not for dividing Goods and/or service among
subcontractors or suppliers. Each section includes general information on the Work included, and method
of payment. Items in the Technical Sections for which payment is to be made
are listed in the Schedule of Items in the Bid Form.
3.7 The drawings are complementary to the Specifications to show size, form, location and
arrangement of various elements of the Work.
68
Item 12.
9
3.8 Section 6.0 - Special Provisions may contain additional instruction, conditions or directions
directly related to the contract or Work of the Contractor.
3.9 The General Conditions indicates that information and data reflected in the Contract Documents
with respect to Underground Facilities at or contiguous to the site is based upon information and data
furnished to Owner and Engineer by owners of such Underground Facilities or others, and Owner and
Engineer shall not assume responsibility for the accuracy or completeness thereof.
3.10 Bidder, prior to submitting a Bid, may conduct a t bidder's expense any additional examinations,
investigations, explorations and tests pertaining to subsurface and physical conditions, and to
Underground Facilities, which are deemed necessary by Bidder to determine an appropriate Bid for
performing and furnishing the work in accordance with the Contract Document. Owner will provide
Bidder with access to the site for the purpose set forth in this paragraph upon agreement of the Bidder to
restore the site as nearly as possible to its original condition.
4.0 SCHEDULE OF PRICES
Bidder, with regard to completing the Schedule of prices of the Bid Form, is advised as follows:
4.1 The Owner, a public body, is not exempt from South Carolina State Sales and Use Taxes and
equipment to be incorporated in the Work, and such taxes shall be included in with price Bid.
4.2 The quantities indicated for Unit Price Work, if any, are estimates and not guaranteed and final
payment will be based on actual quantities constructed.
4.3 The Agreement, if made, will be on the basis of materials and equipment indicated in the Drawings
or specified in the Specifications without consideration of possible substitute items.
4.4 The lands upon which the Work are to be performed, rights -of-way and easements for access
thereto and other lands designated for use by Contractor in performing the Work are identified in the
Contract Documents. All additional lands and access thereto required for temporary construction facilities
or storage of materials and equipment are to be provided by Contractor.
4.5 The amount Bid for each item must be written in words where indicated; these written entries shall
control with regard to price of the Bids received.
5.0 SUBMISSION OF BIDS
5.1 Bidder must provide all information requested in the Bid Form and in attachments thereto by
appropriate entries handwritten in ink or typewritten.
5.2 Bidder must sign the Bid Form as follows:
5.2.1 Proprietorship, signature shall be that of the Proprietor.
5.2.2 Partnership, signatures shall be that of the person or persons authorized to sign
and attest for the partnership.
5.2.3 Corporation, signatures shall be that of the person or persons authorized to sign
and attest for the corporation.
5.3 If Bidder is, a joint venture set forth the full name of the identity or identities comprising the joint
venture. Each joint venture must sign in the manner indicated for the respective form of ownership as set
forth in Paragraph 6.2 of these Instructions to Bidders.
5.4 Bidder must submit with the Bid Form a Bid Security made payable to the Beaufort County
Treasurer in an amount of not less than five percent (5%) of the total amount indicated in the Bid Form,
in the form of a certified or bank check or a Bid Bond issued by a surety authorized to do business in
South Carolina.
5.5 Bids including Bid Security and other required documents, shall be submitted as indicated in the
advertisement for Bids
69
Item 12.
10
5.6 Bids may be modified or withdrawn by a document duly executed in the manner that a Bid must
be executed and delivered to the place where Bids are to be submitted at any time prior to the opening of
Bids.
6.0 DISPOSITION OF BIDS
6.1 OWNER any time prior to Bid opening may withdraw the advertisement for Bids and not accept
Bids. Any Bid received under this circumstance will be returned, unopened to Bidder.
6.2 OWNER may open Bids and (unless obviously non-responsive) read aloud publicly.
6.3 OWNER will reject Bids other than the three (3) apparent lowest responsible bids and return Bid
Security for rejected Bids within ten (10) business days after the date of Bid opening.
6.4 OWNER may hold the three (3) apparent lowest responsible Bids subject to acceptance for ninety
(90) days after the day of the Bid opening; and the Bid security of these Bidders will be returned as follows:
(1) to the unsuccessful Bidders within three (3) business days after a Notice of Award is made to
Successful Bidder, and (2) to the Successful Bidder after the Agreement is executed and the required
contract security furnished.
6.5 OWNER, in evaluating Bids, will consider the qualifications of the Bidders, whether or not the
Bids comply with the prescribed requirements, and such alternates, and of the data, as may be requested
by the Bid Form.
6.6 OWNER reserves the right to reject any and all Bids, to waive any informality and to reject
nonconforming, non-responsive, unbalanced or conditional Bids.
6.7 OWNER may conduct reasonable investigations as deemed necessary to assist in the evaluation
of Bids and to establish the responsibility, qualifications and financial ability of Bidders to perform and
furnish the Work in accordance with the Contract Documents.
6.8 The Beaufort County Council reserves the right to reject all Bids and waive any formalities. Any
claims for cost incurred by any bidders in preparation of any part of, or total package for this project will
not be handled for reimbursement by Beaufort County or their representatives.
7.0 AWARD OF CONTRACT
7.1 OWNER, if the Contract is awarded, will award it to the lowest responsible Bidder. The lowest
Bid will be determined based on the total of the Bid price for each item as indicated in words in the Bid
Form. The written entries will control over numerical entries regardless of whether there are arithmetic
discrepancies between the written amount and the numerical entries.
7.2 OWNER will give the Successful Bidder a Notice of Award within ninety (90) days after the day
of the Bid opening, if the Contract is to be awarded.
7.3 OWNER’S Notice of Award to the Successful Bidder will be transmitted with the required number
of unsigned counterparts of the Agreement.
7.4 Successful Bidder, within fourteen (14) days after receiving Notice of Award shall sign and deliver
the required number of counterparts of the Agreement to Owner with the required Bond. Paragraph 5.1 of
the General Conditions and the Supplementary Conditions set forth Owner's requirements as to
performance and payment bonds.
7.5 Bidder, in submitting Bid, understands and agrees that the Bid security may be forfeited as
liquidated damages, and not as a penalty, if the Bidder is determined to be Successful Bidder and thereafter
fails to execute the Agreement and furnish the required Bonds within the stipulated time.
7.6 OWNER, within ten (10) days after receiving the Agreement and bonds, shall deliver one signed
counterpart to Contractor, and thereby establish the effective Date of the Agreement.
70
Item 12.
11
7.7 The successful Bidder shall secure and pay for necessary approvals, permits, assessments, and
changes required for the construction and installation of this project as required by local, state, and federal
regulations. County permits shall be required as applicable, but the fee shall be waived. This waiver shall
apply to the Beaufort County permit fee only and not to any "City or Town" permit fee and/or licenses,
when applicable.
8.0 COMMENCEMENT OF CONTRACT TIME
8.1 OWNER may give CONTRACTOR a Notice to Proceed within thirty (30) days after the
Effective Date of the Agreement and indicate therein the day on which the Contract Time will commence
to run or shall ensure a Special Provision has been provided to the Contractor (if demolition is NOT
included in the Work).
9.0 CONTRACT TIME
See Project Summary
10.0 DAMAGES
See Project Summary
11.0 RETAINAGE
See Standard General Conditions
12.0 RIGHT TO PROTEST
12.1 Any actual bidder who is aggrieved in connection with the award of a contract may protest to the
Procurement Services Director. The protest shall be submitted in writing within fourteen (14) days of the
Bid opening. The protest must be accompanied by a detailed statement indicating the reasons for such
protest.
12.2 Authority to Resolve Protest. The Procurement Services Director shall have authority, prior to the
commencement of an action in court concerning the controversy, to settle and resolve a protest of an actual
aggrieved bidder, concerning the award of the contract.
12.3 Decision. If the protest is not resolved by mutual agreement, the P rocurement Services Director
shall issue a decision in writing within ten (10) days of receipt of the written protest. The decision shall:
a) State the reasons and describe the actions taken; and
b) Inform the protestant of its right to administrative review as provided in this Section.
12.4 Notice of Decision. A decision under Subsection (3) of the Instructions to Bidder shall be noticed
by certified mail to the protestant and any other party intervening.
12.5 Rights to Review
a) Any person adversely affected by the decision appeals administratively within
(10) Days after receipt of decision to the County Council in accordance with this section.
b) Any protest taken to County Council or court shall be subject to the protestant paying all
of Beaufort County administrative costs, attorney fees and court costs, when it is
determined that the protest is without standing.
12.6 Litigation
a) Any litigation arising out of this Bid Award or subsequent contract or agreement shall be
held only in a Circuit Court of Beaufort County, Beaufort, South Carolina and the
fourteenth Judicial Circuit.
71
Item 12.
12
BEAUFORT COUNTY STANDARD CLAUSES
CONTRACTUAL REQUIREMENTS
1. OWNERSHIP OF MATERIAL : Ownership of all data, material, and documentation originated and
prepared for the County pursuant to this contract shall belong exclusively to the County.
2. NONRESIDENT TAXPAYERS: If the offeror is a South Carolina nonresident taxpayer and the contract
amount is $10,000.00 or more, the offeror acknowledges and understands that in the event he is awarded a
contract offeror shall submit a Nonresident Taxpayer Registration Affidavit (State form #1 -312-6/94),
before a contract can be signed. Affidavit must certify that the nonresident taxpayer is registered with the
S.C. Department of Revenue or the S.C. Secretary of State’s Office, in accordance with Section 12 -9-
310(A) (2) (3) of S.C. Code of Laws (1976) as amended.
3. BUSINESS LICENSE In a ccordance w ith the Beaufort County Busin ess L icense Ordinance, 99-36,
Article II I, as enacted Novembe r 22, 1999, any busin ess or individual gene rating inc ome in the
unincorporated area of B eaufort County is required to pay an annual lic ense fee and obtain a busi ness
license. The ordinance refer enced is available on the Beaufort County w ebsite a t
www.beaufortcountysc.gov or by calling the Busin ess License Administrator at (843) 255-2270 f or a list
of schedules.
4. ADDITIONAL ELIGIBILITY: Other Beaufort County Public Procurement units shall, at their option, be
eligible for use of any contracts awarded pursuant to this solicitation.
5. INSURANCE REQUIREMENTS : Prior to commencing work/delivery hereunder,
contractor/vendor, at his expense, shall furnish insurance certification showing the certificate
holder as Beaufort County, P. O. Drawer 1228, Beaufort, SC 29901, Attention: Risk Management
Director, and with a special notation naming Beaufort County as an additional insured on the
liability coverages. Minimum coverage shall be as follows:
5.1 Worker’s Compensation Insurance – Contractor shall have and maintain, during the life of
this contract, Worker’s Compensation Insurance for his or her employees connected to the
work/delivery, in accordance with the Statutes of the State of South Carolina and any
applicable laws. Employers Liability minimum limits required $500,000
5.2 C
ommercial General Liability Insurance - Contractor shall have and maintain, during the life
of this contract, Commercial General Liability Insurance. Said Commercial General
Liability Policy shall contain Contractual Liability and Products/Completed Operations
Liability subject to the following minimum limits:
$1,000,000 Each Occurrence/ $2,000,000 General Aggregate and $2,000,000
Products/Completed Operations Aggregate naming Beaufort County as an additional
insured.
5.3 Comprehensive Automobile Liability Insurance – The Contractor shall have and maintain, during
the life of this contract, Comprehensive Automobile Liability, including non-owned and hired
vehicles, of at least $500,000 COMBINED SINGLE LIMIT.
5.3.1 ADDITIONAL INSURANCE REQUIREMENTS: Umbrella Liability Insurance – Contractor
shall have and maintain, during the life of this contract, Umbrella Liability Insurance with a
minimum limit of $2,000,000
5.3.2: Professional Liability (Errors & Omissions): Professional Liability Insurance protects against
72
Item 12.
13
losses that occur when a “professional” errors in judgement, planning, and design could
result in economic loss to the entity or county. In order to determine if Professional Liability
should be required ask yourself: Is the professional licensed or certified (i.e. architects,
consultants, auditors, attorneys, engineers, etc.)? Required if a contractor is performing any
type of design/build for a particular project.
The vendor shall maintain a limit no less than $1,000,000 per occurrence:
6. The required insurance policy at the time of issue must be written by a company licensed to do business
in the State of South Carolina and be acceptable to the County.
6.1 The Contractor/vendor shall not cause any insurance to be canceled or permit any insurance to lapse.
All insurance policies shall contain a clause to the effect that the policy shall not be canceled or
reduced, restricted or limited, until fifteen (15) days after the County has received written notice, as
evidenced by return receipt of registered or certified letter. Certificates of Insurance shall contain
transcript from the proper office of the insurer, the location, and the operations to which the
insurance applies, the expiration date, and the above-mentioned notice of cancellation clause.
6.2 The information described above sets forth minimum amounts and coverages and is not to be
construed in any way as a limitation on the Contractor’s liability.
73
Item 12.
14
IFB #_____________
BID FORM
THIS BID SUBMITTED TO: ____________________________________
TITLE OF WORK:
LOCATION OF WORK: _________________________________________________
1. BIDDER has examined all Contract Documents including Addenda.
2. BIDDER understands and accepts the terms and conditions of the Invitation to Bid, Instructions
to Bidders, and all other Contract Documents.
3. BIDDER having examined the plans and specifications with related documents and the site of
the proposed work, and being familiar with all of the conditions surrounding the construction of the
proposed project including the availability of materials and supplies to construct the project in
accordance with the contract documents, within the time set forth herein, and at the process stated below,
proposed to enter into a contract with the County to provide the necessary machinery, tools, apparatus,
all materials and labor, and other means of construction necessary to complete the Work. The
undersigned proposes to furnish and construct the items listed in the attached Schedule of Items for the
unit prices stated.
4. BIDDER agrees that the cost of any work performed, materials furnished, services provided
or expenses incurred, which are not specifically delineated in the Contract Documents, but which are
incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included
in the prices bid for the various items scheduled.
Start and Completion of Work
The Bidder further proposes and agrees hereby to promptly commence the Work with adequate force
and equipment within ten (10) calendar days from receipt of Notice to Proceed, or as may be specified
by Special Provision. Contractor shall complete all work not later than 120 calendar days following
the date of the Notice to Proceed or IAW any Special Provision by the Owner.
Bidder acknowledges receipt of the following addenda:
5. BIDDER acknowledges that, in accordance with the Agreement, Liquidated Damages are set at
$500 per calendar day.
6. In accordance with Paragraph 5.1 of the Agreement, progress payments will be made less
retainage in an amount equal to ten percent (10%). If the Contractor is 50% complete with the project
74
Item 12.
15
and on schedule, the retainage may be reduced to five percent (5%).
7. The Work shall be completed in accordance with the Schedule of Prices set forth by
BIDDERS in Bid Form - Schedule of Prices which is attached hereto and made a part hereof.
8. BIDDER will, if this Bid is accepted by Owner, enter into the Agreement included in the
Contract Documents to perform and furnish all Work as specified or indicated in the Contract
Documents.
9. BIDDER has completed the following additional documents, which are attached hereto and
made a part hereof:
(a) NON-COLLUSION AFFIDAVIT
(b) CONSENT OF SURETY
(c) BID BOND
(d) CERTIFICATION BY CONTRACTOR
10. BIDDER has included with this Bid Form a Bid security in an amount and under the terms and
conditions indicated in the Instructions to Bidders.
11. BIDDER is organized under the laws of the State of as
a __________________ (indicate proprietorship, partnership, or corporation) as follows:
Name (of business):
Address:
Telephone: FAX:
South Carolina Bidder's License No.:
Licensing Authority:
12. Communications concerning this Bid should be addressed to the BIDDER’s company, to the
attention of:
Name: ______________________________________________________________
Address:
Email: ________________________________________________________________________
Telephone: Email:
75
Item 12.
16
SIGNED BY:
Signature
Name Printed
Title: Date:
I, the above signed, certify that this Bid does not violate any Federal or State Antitrust Laws.
(Initial)
76
Item 12.
17
IFB #_____________
PRICING
Beaufort County Government Center
New Parking Lot
Schedule of Values
Division
No.
Description of Work Scheduled Value
(Include Sales Tax as
Appropriate)
Base Bid Scope of Work
01. General Conditions $
02. Clearing and Grading $
03. Utilities $
04. Storm Water Piping and Structures $
05. Asphalt Paving $
06. Pervious Paving $
07. Concrete Paving and Sidewalks $
08. Pavement Markings $
09. Concrete Curb and Gutter $
10. Generator and Dumpster Screen Wall and Gate $
11. Parking Lot Lighting $
12. Irrigation $
13. Landscaping $
14. Cleanup. $
15. Closeout. $
Total Base Bid Value: $
Alternate Bid Items
01.
Deduct Alternate 01: Deductive cost to remove from
the Scope of Work, the generator screen wall, dumpster
pad and screen wall and associated gates. Provide
instead, a landscaped screen around the existing
generator. See Drawing A-102 alt for additional
information.
$
77
Item 12.
18
IFB #____________
BID BOND
(Five Percent [5%] of Bid)
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned:
, as Principal, and
, as Surety, are hereby held and firmly bound unto Beaufort County, South
Carolina as County in the penal sum of
Dollars
($ ) for the payment of which, well and truly to be made, we hereby jointly
and severally bid ourselves, our heirs, executors, administrators, successors, and assigns. Signed this day
of , 20 .
The condition of the above obligation is such that whereas the Principal has submitted to Beaufort County, South
Carolina a certain bid attached hereto and hereby made a part hereof to enter into a contract in writing for the
construction of:
NOW, THEREFORE,
a) If said bid shall be rejected or in the alternate.
b) If said bid shall be accepted and the Principal shall execute and deliver a Contract in the Form of
Contract attached hereto (properly complete in accordance with said bid) and shall furnish a bond
for his faithful performance of said Contract and for the payment of all persons performing labor
and furnishing material in connection therewith, and shall in all other respects perform the
agreement created by the acceptance of said bid, then this obligation shall be void, otherwise the
same shall remain in force and effect, it being expressly understood and agreed that the liability of
the surety for any and all claims hereunder shall, in no event, exceed the penal amount of this
obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall
be in no way impaired or affected by any extension of the time within which the County may accept such bids,
and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them
as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their
proper officers, the day and year first set forth above.
(SEAL)
Principal
By:
(SEAL)
Surety:
By:
South Carolina Representative
78
Item 12.
19
IFB #____________
CONSENT OF SURETY
OWNER:
TITLE OF WORK:
(Complete above exactly as given in Invitation to Bid)
In consideration of the premises and of One Dollar ($1.00) , lawful money of the United States, it is in
hand paid by the Contractor, the receipt whereof, is hereby acknowledged, the undersigned surety
consents and agrees that if the contract, for which the preceding Bid is made, be awarded to the person
or persons submitting the same as contracted, it will become bound as surety and guarantor for its
faithful performance in an amount equal to one hundred percent (100%) of the Contract Price, and will
execute as surety thereto when required to do so by the Owner, and if the said Contractor shall omit or
refuse to execute such contract, if so awarded, it will pay without proof of notice and on demand to the
Owner any increase between the sum of which the said Contractor would have been entitled upon the
completion of the said Contract and the sum which the said Owner may be obligated to pay to another
contractor to whom the contract may be afterwards awarded, the amount in such case to be determined
by the bids plus the cost, if any, of re-advertising for bids for this work, less the amount of any certified
check or bid bond payable and received.
In witness whereof, said surety has caused these presents to be signed and attested by a duly authorized
officer and its corporate seal to be hereto affixed this day of ,
20 .
(A corporate acknowledgment and statement of authority to be here attached by the surety company).
(Surety Company)
BY:
(Surety Company, Attorney-In-Fact)
Attest:
79
Item 12.
20
IFB #____________
CERTIFICATION BY CONTRACTOR
Regarding
NON-SEGREGATED FACILITIES
The Bidder certifies that he does not, and will not, provide and maintain segregated facilities for his
employees at his establishments and, further that he does not, and will not, permit his employees to
perform their services at those locations, under his control, where segregated facilities are provided and
maintained. Segregated fountains, transportation, parking, entertainment, recreation, ad housing
facilities; waiting, rest, wash, dressing, and locker room, and time clock, work, storage, restaurant, and
other eating areas which are set apart in fact, or by explicit directive, habit, local custom, or otherwise,
on the basis of color, creed, national origin, and race. The Bidder agrees that, except where he has
obtained identical certifications from proposed subcontractors for specific time periods, he will obtain
identical certifications from proposed subcontractors prior to the award of subcontractors exceeding
$10,000.00 which are not exempt from the provisions of the Equal Opportunity clause, and that he will
retain such certifications in his files.
The Bidder agrees that a breach of this certification is a violation of the Equal Opportunity clause in
this Contract. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
Contractor
(Signature)
Name and Title of Signer
Date
80
Item 12.
21
IFB #_____________
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
State of )
) ss.
County of )
being first duly sworn, deposes and
says that:
He is (Owner, Partner, Officer,
Representative, or Agent) of the Bidder that has submitted the attached Bid;
(1) He is fully informed respecting the preparation and contents of the attached Bid and of all
pertinent circumstances respecting such Bid;
(2) Such Bid is genuine and is not a collusive or sham Bid;
(3) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives,
employees, or parties in interest, including this affiant, has in any way colluded, conspired, connived, or
agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in
connection with the Contract for which the attached Bid has been submitted to or refrain from bidding in
connection with such Contract, or has in any collusion or communication or conference with any other
Bidder, firm or person to fix the price or prices in the attached Bid or of another Bidder, or to fix any
overhead, profit or cost element of the bid price or the Bid of any other Bidder, or to secure through any
collusion, conspiracy, connivance or unlawful agreement any advantage against Beaufort County or any
person interested in the proposed Contract; and,
(4) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any of its agents,
representative, owners, employees, or parties in interest, including this affiant.
Name
Title
Subscribed and Sworn to before me this
day of ,20 .
(SEAL)
Title
My commission expires:
81
Item 12.
22
IFB #__________
CONTRACTOR’S QUALIFICATION STATEMENT
CERTIFICATION: The following is a statement of fact.
Signature Typed Name and Title Date
A. GENERAL
A.1 Submit to:
A.2 Name of Project (if applicable): [Project Title]
[Project Location]
A.3 Contractor:
A.4 Name:
Mailing Address:
Street Address:
Telephone Number (including area code):
Facsimile Number (including area code):
Contact Person:
Contact Person’s Telephone Number:
South Carolina Contractor’s License Number:
B. BUSINESS ORGANIZATION
B.1 Check type of business organization:
Corporation Individual Partnership
(Name of Partners)
Joint Venture Other
B.2 If a corporation:
State of Incorporation:
If not incorporated in South Carolina, State Corporation Commission Registration
Number:
Date of Incorporation:
Federal I.D. Number:
Officers:
82
Item 12.
23
Name Address Phone No. Position Yrs
in
President:
Vice President(s):
Secretary:
Treasurer:
Are you a Subchapter S
Corporation: Yes No
Name Address Phone No. ______
Subchapter S Shareholders:
B.3 If a partnership:
Date of Organization:
Type of partnership:
List of General Partners:
Name Address & Phone No. ______
Years as GP____________________________________________________________________
B.4 If individually owned:
Name, address, and phone number of sole- proprietor:
83
Item 12.
24
Years in business:
B.5 Have you ever operated under another name? Yes No
If yes,
All other business names and addresses of principal placed of business for each business.
Number of years in business under each name:
Contractor’s license number in each state in which a business was operated.
C. BONDING
C.1 Bonding Agent:
Name:
Address:
Telephone Number (including area code):
Contact Person:
C.2 Bonding Company:
Name:
Address:
Telephone Number (including area code):
Contact Person:
Best’s Key Rating of bonding company:
C.3 Number of years this bonding company has acted as surety for you:
84
Item 12.
25
C.4 Bonding Capacity: Maximum single job size:
Total bonding limit:
C.5 Do you intend to use any alternative form of security?
If so, indicate the form of security you intend to use and the name, address, point of contact, and
telephone number of the banks, savings and loan, or surety you intend to use. (NOTE:
Prequalification will not assure acceptance of any form of security.)
Form of Security:
Bank or Savings & Loan:
Contact:
Address & Phone No.:
C.6 Have any Performance or Payment Bond claims ever been paid by any surety on behalf of your
organization?
Yes No
If yes, state the name of the project(s); the date; the name, address, telephone number, and
contact person for the claimant; the surety satisfying the claim; the size of the claim; and the
circumstances giving rise to the claim. (Provide attachments if necessary.)
C.7 Have you ever arbitrated or litigated a claim with an Owner, Architect, or Engineer in the last
five years?
Yes No
If yes, state the name of the project(s); the date; the name, address, telephone number, and
contact person for the claimant; the surety satisfying the claim; the size of the claim; and the
circumstances giving rise to the claim. (Provide attachments if necessary.)
C.8 If you answer yes to the following, provide the name, address, telephone number, contact
person, and circumstances relating to the question on a separate attachment.
Have you or any officer, partner, or owner of your organization, in any state or territory of the
United States, or with respect to any agency of the Federal government:
a) In the last in the last five years, received any fines or citations for building code
violations which were unrelated to design? Y N
85
Item 12.
26
b) Ever been found to be guilty of charges relating to
conflicts of interest: Y N
c) Ever been convicted on charges related to any
criminal activity relating to construction means,
methods, or techniques; bidding or bid rigging;
or bribery? Y N
d) In the last five years, been found guilty of any
minority contracting law violations? Y N
e) In the last five years, pleaded no contest in any
criminal proceeding related to contracting? Y N
f) Ever been disbarred from doing Federal, state,
or local government work for any reason? Y N
g) Ever been terminated on a contract due to your
default? Y N
h) In the last five years, paid liquidated damages
for being late on a project? Y N
i) In the last five years, been subject to tax collection
proceedings? Y N
j) In the last seven years, filed for bankruptcy? Y N
If the answer to j) was yes, under what chapter of bankruptcy did you file?
If you filed under Chapter 11 Reorganization, how long did you operate under this status?
Are you operating under Chapter 11 status now? Y N
D. SAFETY
D.1 Have you, in the last three years, been cited for willful violations for failure to abate, or for
repeated violations, by the United States Occupational Safety and Health Administration or by
the South Carolina Occupational Safety and Health Administration or by any other
governmental body? Y N
If yes, state date, name, address, telephone number, and contact person for agency issuing
citation and the nature of the violation. Also, advise the amount of fines paid, if any. Provide
attachments if necessary.
86
Item 12.
27
D.2 List your worker’s compensation experience modifier for the last three years.
E. References
E.1 Provide at least two references from each industry group listed. Provide other references as
requested. Provide current names, addresses, telephone numbers, and contacts.
Architects/Engineers:
Major Subcontractors:
Financial Institutions:
87
Item 12.
28
Certification regarding Debarment, Suspension, Ineligibility,
and Voluntary Exclusion:
Company Name:
The contractor certifies, by submission of this qualification statement or acceptance of a
contract, that neither it nor its principals is presently debarred, suspended, proposed for
debarment, declared ineligible, or voluntarily excluded from participation in this transaction by
any State, Federal department, or agency. It further agrees by submitting this qualification
statement that it will include this clause without modification in all lower tier transactions,
solicitations, proposals, contracts, and subcontracts. Where the bidder/contractor or any lower
tier participant is unable to certify to this statement, it shall attach an explanation to this
solicitation/bid. State whether or not your company has been involved in any litigation within
the past five (5) years arising out of your performance.
Circle Yes or No.
If you answer yes, explain fully if it has been involved in any litigation involving performance.
Signature
88
Item 12.
29
LOCAL VENDOR PREFERENCE – PARTICIPATION AFFIDAVIT
SECTION 2.537.1
A competitive procurement made by Beaufort County shall be made from responsive and responsible
resident vendors in the County for procurement, if such bid does not exceed the lowest qualified bid from a non- county
vendor by more than five (5%) percent or Ten Thousand ($10,000.00) Dollars, whichever is less of the lowest non- county
bidder. The resident vendor has the discretion to match the bid submitted by the non-county vendor and receive the contract
award.
A vendor shall be deemed to be a “local vendor” if such vendor is an individual, partnership, association or
corporation that is authorized to transact business within the state, maintains an office in the Beaufort County, has a business
license of Beaufort County or one of the municipalities within Beaufort County, and maintains a representative inventory
of commodities within Beaufort County or one of the municipalities on which the bid is submitted and has paid all taxes
duly assessed.
If no bids are received, from a Beaufort County Local Vendor a vendor shall be deemed to be a “local
vendor” if such vendor is an individual, partnership, association or corporation that is authorized to transact business within
the state, maintains an of fice in Jasper, Hampton, or Colleton Counties (local preference only applies if Jasper, Hampton
and Colleton Counties offer reciprocity to Beaufort County). A competitive procurement made by the county shall be made
from responsive and responsible resident vendors in the respective counties for procurement, if such bid does not exceed
the lowest qualified bid from a non- local vendor by more than five (5%) percent or $10,000.00, whichever is less, local
vendor has the discretion to match the bid submitted by the non-local vendor and receive the contract award.
If the procurement is to be made pursuant to state or federal guidelines, which prohibit or restrict a local or
state preference, there shall be no local or state preference unless a more restricted variation is allowed under the guidelines.
Local/state preference shall not be applied to the procurement of construction services.
The undersigned hereby attests that the criteria of the “RESIDENT VENDOR PREFERENCE, SECTION 2.537.1” are
met for the purposes of bid document __________________, dated _____________________.
Company Name: __________________________ Principal Name: _____________________________
Company Address: ____________________________________________________________________
____________________________________________________________________
Secretary of State Designation: (Corporation, Individual, Partnership, Other) _______________________
Beaufort County Business License/Classification: ____________________________________________
Tax Obligation Current: _________________________________________________________________
Signature of Principal/Date: _______________________________________________________________
Witness/Date: ___________________________________________________________________________
89
Item 12.
30
Program Provisions for
Small and Minority
Business Participation
Beaufortcountysc.gov
PLEASE REVIEW THIS SECTION CAREFULLY,
PAYING PARTICULAR ATTENTION TO “PRE-AWARD
DOCUMENTS” DUE WITH THE BID/PROPOSAL,
THE “GOOD FAITH EFFORTS CHECKLIST”,
AND EXHIBITS 1-3.
FAILURE TO FOLLOW THE PROGRAM REQUIREMENTS
AND/OR FURNISH THE REQUESTED DOCUMENTS MAY
RESULT IN THE REJECTION OF YOUR BID/PROPOSAL.
90
Item 12.
31
Small and Minority Business Participation Program Documents Overview*
PRE-AWARD DOCUMENTS
Item/Form Submission
Requirements
1 Program Overview
n/a
2 Self-Performance Affidavit
Indicates intention to perform work and/or provide services with own current
workforce.
Due with bid/proposal
only if self-performing
100%.
3 Good Faith Efforts Checklist
Indicates the actions undertook to recruit and solicit small and minority
businesses for this project.
Due with bid/proposal.
4 Good Faith Agencies Distribution List
Indicates agencies that should receive notice of solicitation to small and minority
businesses for this project.
Copy of notice sent to
good faith agencies due
with bid/proposal.
5 Outreach Written Notice Example
Sample of notice to be sent to small and minority businesses soliciting their
participation for this project.
Copy of notice sent to
small and minority
businesses due with
bid/proposal.
6 Non-Discrimination Statement – Exhibit 1
Certification that this project is open to all businesses and persons and that no
business or person shall be excluded from participating in the Beaufort County
procurement process.
Due with bid/proposal.
7 Outreach Documentation Log – Exhibit 2
Documents solicitation efforts to obtain small and minority business participation
for this project.
Due with bid/proposal.
8 Proposed Utilization Plan – Exhibit 3
Listing of the small and minority businesses that will participate on this project
and their proposed contract dollar amounts.
Due with bid/proposal.
POST-AWARD DOCUMENTS
Item/Form Submission
Requirements
9 Compliance Efforts
If the successful bidder/proposer, indicates the actions required to earnestly carry
out the small and minority business utilization plan and document payments
thereof.
n/a
10 Monthly Compliance Status Report – Exhibit 4
Certifies monthly usage and payments to small and minority businesses.
Due monthly after work
commences throughout
the life of the contract.
* NOTE: Projects involving Federal funds may have Disadvantaged Business Enterprise (DBE) participation goals and
requirements of 49 CFR Part 26, Regulations of the U.S. Department of Transportation (USDOT), or other Federal requirements
prescribed by the U.S. Department of Agriculture (USDA) or U.S . Department of Housing and Urban Development (HUD).
Contractors submitting bids on such projects will also have to meet any outlined DBE Program requirements listed in the bid
documents and submit items, including but not limited to, the following: (1) Certification of Contractor to Comply with DBE
Requirements; (2) DBE Letter of Intent and Affirmation; (3) DBE Contract Totals and Percentage; and (4) Bidder’s List
Questionnaire. For a current list of South Carolina DBE firms, please visit www.scdot.org and go to “ Doing Business with
SCDOT”, then see “Office of Business Development and Special Programs” and click on “DBE Directory”. Likewise, any USDA
and/or HUD requirements must be met in addition to Beaufort County’s requirements.
91
Item 12.
32
PROGRAM OVERVIEW
Introduction
Beaufort County recognizes that the South Carolina General Assembly, in South Carolina Code of Laws Section 11- 35-
5210*, has declared that businesses owned and operated by minority persons have been historically restricted from full
participation in our free enterprise system to a degree disproportionate to other businesses; and that it is in the state’s best
interest to assist minority -owned businesses to develop fully as a part of the state’s policies and programs which are
designed to promote balanced economic and community growth throughout the state. Therefore, Beaufort County wishes
to ensure that those businesses owned and operated by minorities are afforded the opportunity to fully participate in its
overall procurement process for goods and services. Further, Beaufort County seeks to ensure that small businesses are
likewise afforded the same participation opportunity as minority businesses. Consequently, attention of all bidders and
proposers is called to contract conditions contained herein pertaining to Beaufort County’s “ Small and Minority Business
Participation Program”, as prescribed in the Beaufort County Code of Ordinances Section 2- 537.2.
Definitions
Small Business means a for-profit concern, including its affiliates, that is independently owned and operated, not dominant
in the field of operation in which it is bidding on government contracts, and qualified as a small business under the criteri a
and size standards in the Code of Federal Regulations, Title 13, Part 121, as amended. Beaufort County refers to these
businesses as Small Business Enterprises or “SBE”.
Minority Business means a concern at least fifty -one percent (51%) owned by a person determined to be socially and
economically disadvantaged. Socially disadvantaged means those persons who have been subject to racial or ethnic
prejudice or cultural bias because of their identification as members of a certain group without regard to their individual
qualities. Such groups include, but are not limited to, Black Americans, Hispanic Americans, Native Americans (including
American Indians, Eskimos, Aleuts and Native Hawaiians), Asian Pacific Americans, women and other minorities to be
designated by the Beaufort County Council. Economically disadvantaged means those socially disadvantaged persons
whose ability to compete in the free enterprise system has been impaired due to diminished capital and credit opportunities
as compared to others in the same business area that are not socially disadvantaged. Beaufort County refers to minority
businesses as Minority Business Enterprises or “MBE”.
Small and Minority Business Enterprises will be abbreviated as “S/MBE”.
Provisions
The successful bidder or proposer, hereafter referred to as “Contractor”, is required to (1) make specific Pre-Award “Good
Faith Efforts” to recruit S/MBE and (2) Post -Award “Compliance Efforts ” of its labors to utilize S/MBE, unless self -
performing one hundred percent (100%) of the contract work. Falsification of any pre- award or post-award documents will
be considered a serious breach of public trust and funds.
* SOUTH CAROLINA CODE OF LAWS, CHAPTER 35 “SOUTH CAROLINA CONSOLIDATED PROCUREMENT CODE,
SUBARTICLE 1 “ASSISTANCE TO MINORITY BUSINESSES”
92
Item 12.
33
If self-performing 100% sign below and return this page with your bid/proposal.
I hereby certify my company’s intent to perform one hundred percent (100%) of the work required for:
Project Name: ________________________________________________________________
Bid/Proposal Number: ________________________________________________________________
By signing this affidavit, I further certify that my company has the capability to perform and will perform all
elements of the work on the project referenced above with my company’s employees.
I further agree to provide additional information or documentation requested by Beaufort County in support of the above
statement.
If a need to subcontract all and/or some of my company’s work on this project arises, I will notify the Beaufort County
Compliance Office in writing within three (3) business days.
________________________________________________
Name of Company
________________________________________________
Authorized Representative Name
________________________________________________
Signature
_______________________________________________
Title
________________________________________________
Date
State of _______________________________________ County of _____________________________
Subscribed and sworn to before me this __________ day of _____________________________ 20____
Notary Public __________________________________ My Commission Expires: __________________
SELF-PERFORMANCE AFFIDAVIT
93
Item 12.
34
Pre-award efforts include the following “good faith efforts” for Contractors intending to use subcontractors, or
the bid/proposal may be rejected.
If using subcontractors, return this page (and required supporting documents) with your bid/proposal.
Divide and/or combine scope of work packages into economically feasible units, if possible .
Send a written notice at least ten (10) business days prior to the bid/response due date of your intent to submit
a bid/response, and express interest in receiving quotes thereof to (1) potential S/MBEs and (2) “good faith
agencies”:
The written notice should contain the Contractor’s name and contact information; project name; project
number; scope of work/bid packages available for subcontracting; information on availability of plans and
specifications; and the Contractor’s company policy regarding insurance, bonding, and financial
requirements, if any.
Submit with the bid/proposal, copies of the written notice sent specifically to S/MBEs, along with the fax transmittal
confirmation slips (if sent by fax), copies of the e-mails (if e-mailed), and/or copies of metered or stamped envelopes
(if sent by mail).
Submit with the bid/proposal, copies of the written notice sent specifically to the “good faith agencies”, along with
the fax transmittal confirmation slips (if sent by fax), copies of the e-mails (if e-mailed), and/or copies of metered or
stamped envelopes (if sent by mail).
Complete and submit Exhibits 1-3 with all requested supporting documentation (where applicable):
Exhibit 1: Non-Discrimination Statement
Exhibit 2: Outreach Documentation Log
Exhibit 3: Proposed Utilization Plan
The undersigned acknowledges making a good faith effort to comply with the above areas checked:
________________________________________________
Name of Company
________________________________________________
Authorized Representative Name
________________________________________________
Signature
_______________________________________________
Title
________________________________________________
Date
GOOD FAITH AGENCIES DISTRIBUTION LIST
94
Item 12.
35
Send written notice at least ten (10) business days prior to the bid/response due date to all the agencies listed below and do the
following: (1) indicate your company’s intent to submit a bid/response and (2) request their assistance in the recruitment of
small and minority businesses. You may mail, fax, OR e-mail the notice.
Submit notice copy with the bid/proposal, copies of the written notices sent to these agencies.
Beaufort County Black Chamber of Commerce
Attention: Ms. Maryland Harris
711 Bladen St.
Beaufort, SC 29901
FAX: (843) 737-9882
EMAIL: mharris@bcbcc.org
Beaufort Regional Chamber of Commerce
Attention: Mr. Ian Scott
Post Office Box 910
Beaufort, SC 29901
FAX: (843) 986-5405
EMAIL: hello@beaufortchamber.org
EMAIL: ian@beaufortchamber.org
Hilton Head Island-Bluffton Chamber of Commerce
Attention: Mr. Ray Deal
Post Office Box 5647
Hilton Head Island, SC 29938
FAX: (843) 785-7110
EMAIL: rdeal@hiltonheadisland.org
SCDOT Disadvantaged Business Enterprise Program
Attention: Mr. Gregg Davis
955 Park Street
Columbia, SC 29202
EMAIL: DavisGQ@scdot.org
You can also look up DBE by clicking the link: https://www.scdot.org/business/bus-development-dbe-sbe-cert.aspx
Small Business Administration
Attention: Mr. Carl Faison
1835 Assembly Street, Suite 1425
Columbia, SC 29201
FAX: (803) 765-5962
EMAIL: carl.faison@sba.gov
GOOD FAITH EFFORTS CHECKLIST (PRE-AWARD)
95
Item 12.
36
OUTREACH WRITTEN NOTICE EXAMPLE
Send written notice at least ten (10) business days prior to the bid/response due date to potential small and
minority businesses and provide notice of the following: (1) intent to submit a bid/response and (2) interest in
receiving quotes from small and minority businesses.
You may mail, fax, OR e-mail the notice.
Submit all notices with the bid/proposal, copies of the written notices sent to these agencies.
No Name Company
Post Office Box 1234
Any Town, US
(123) 555-7777 Telephone
(123) 555-8888 Fax
Date
Subcontractor Company Name
Subcontractor Mailing Address
Subcontractor City, State, Zip
Dear Subcontractor Company Name:
No Name Company is pursuing work with Beaufort County, South Carolina and intends to submit a bid/proposal for Beaufort
County IFB/RFP # 000-00000.
We have the following opportunities for subcontracting on this project:
• Describe Bid Package 1
• Describe Bid Package 2
• Describe Bid Package 3
• Etc…
Plans and specifications are available at our office and at _______________ and __________________.
It is the police of No Name Company that _____________ ( state policy concerning W -4, insurance, credit lines, and
assistance in obtaining bonds, etc.)
The IFB/RFP closing date is _______________________ at 3:00 pm and therefore, we must receive your quote/proposal
into our office no later than __________ pm.
If you have any questions, please contact Mr. /Ms. _________________________ at our company.
We look forward to hearing from you.
Sincerely,
______________________
Title
No Name Company
Example
96
Item 12.
37
EXHIBIT 1
Non-Discrimination Statement
The bidder/proposer certifies that:
1) No person shall be excluded from participation in, denied the benefit of, or otherwise discriminated against on the basis
of race, color, national origin, or gender in connection with any IFB/RFP submitted to Beaufort County or the
performance of any contract resulting thereof;
2) That it is and shall be the policy of this Company to provide equal opportunity to all business persons seeking to contract
or otherwise interested in contracting with this Company for Beaufort County contracts, including those companies
owned and controlled by socio-economic and racial minorities;
3) In connection herewith, we acknowledge and warrant that this Company has been made aware of, understands and
agrees to take affirmative action to provide such companies with the maximum practicable opportunities to do business
with this Company;
4) That this promise of non- discrimination as made and set forth herein shall be continuing in nature and shall remain in
full force and effect without interruption throughout the life of the referenced contract with Beaufort County;
5) That the promises of non- discrimination as made and set forth herein shall be and are hereby deemed to be made a
part of and incorporated by reference into any contract or portion thereof which this Company may hereafter obtain and;
6) That the failure of this Company to satisfactorily discharge any off the promises of non- discrimination as made and set
forth herein shall constitute a material breach of contract entitling Beaufort County to declare the contract in default and
to exercise any and all applicable rights and remedies including, but not limited to cancellation of the contract,
termination of the contract, suspension and debarment from future contracting opportunities, and withholding and/or
forfeiture of compensation due and owning on a contract.
________________________________________________
Name of Company
________________________________________________
Authorized Representative Name
________________________________________________
Signature
________________________________________________
Title
________________________________________________
Date
Return this page with your bid/proposal
97
Item 12.
EXHIBIT 2
Outreach Documentation Log
Bidder/Proposer Name: ______________________________________________________________________________
IFB/RFP No.: ______________________________________________________________________________
IFB/RFP Date: ______________________________________________________________________________
Project Name: ______________________________________________________________________________
LIST INFORMATION FOR THE S/MBEs YOU CONTACTED FOR INTEREST AND POTENTIAL PARTICIPATION
(Use additional sheets if necessary and mark “Exhibit 2 Attachment”)
Name of S/MBE Firm
Type
Address Telephone
Number
Trade/Commodity Letter
Sent (Y/N)
Response (No Response /
Will Quote / Will Not Quote)
Result (If
Submitting Quote)
The undersigned proposes to enter into a formal agreement with the S/MBEs identified herein for work, schedule and value list ed in this schedule conditioned upon
execution of a contract with Beaufort County.
Name: ___________________________________ Signature: ___________________________________ Title: _____________________________ ______
Return this page with your bid/proposal
98
Item 12.
EXHIBIT 3
Proposed Utilization Plan
Bidder/Proposer Name: ______________________________________________________________________________
IFB/RFP No.: ______________________________________________________________________________
IFB/RFP Date: ______________________________________________________________________________
Project Name: ______________________________________________________________________________
LIST INFORMATION FOR THE S/MBEs YOU INTEND TO UTILIZE
(Use additional sheets if necessary and mark “Exhibit 3 Attachment”)
Name of S/MBE Firm
Type
Address Telephone
Number
Point of Contact Trade/Commodity Contract / PO Amount
Total Anticipated Small Business Enterprise Participation Dollar Value: $_______________________________________________
Total Anticipated Minority Business Enterprise Participation Dollar Value: $_______________________________________________
The undersigned proposes to enter into a formal agreement with the S/MBEs identified herein for work, schedule and value listed in this schedule conditioned upon
execution of a contract with Beaufort County.
Name: ___________________________________ Signature: ___________________________________ Title: _____________________________ ______
Return this page with your bid/proposal
99
Item 12.
40
COMPLIANCE EFFORTS (POST-AWARD)
The successful Contractor is required to fulfill any Small and Minority Business Enterprise (S/MBE) commitments
made in conjunction with the “Pre-Award Good Faith Efforts”, unless good cause is demonstrated for any failure to
fulfill such commitment.
If the Contractor intends to make any substitutions for any reasons, the Beaufort County Compliance Office must
be notified in writing within ten (10) business days for discussion and approval. No Contractor shall enter into an
agreement with any S/MBE that would in any manner limit the S/MBE from selling or acting as a subcontractor to
any other party.
Beaufort County shall have the right to inspect the Contractor’s records related to activity and expenditures to
S/MBE utilized on its projects, to include related contracts/purchase orders and payment records, such as cancelled
check copies. Further, designated Beaufort County personnel are permitted access to all work sites. Contractors
and their staff should take measures to cooperate fully with all Beaufort County staff, including, but not limited to
the Procurement Services Director and Compliance Officer.
“Post-Award Compliance Efforts” require the Contractor to not only provide monthly reports regarding activity and
expenditures to S/MBE, but also to maintain related records throughout the life of the project regarding its efforts to
comply with the Small and Minority Business Participation Program. The “Monthly Compliance Status Report” must
be submitted to the Compliance Office until the project ends, by the fifth (5 th) day, reflecting the activity of the
previous month.
After the County receives a monthly status report marked as “final”, the Contractor will be issued an affidavit to
certify totals regarding S/MBE usage throughout the life of the project.
All questions regarding “Post-Award Compliance Efforts” should be directed to the Compliance Office vie e- mail at
dthomas@bcgov.net or (843) 255-2304.
Small and Minority Business Participation Program Documents – Beaufort County, South Carolina
Revised 2 February 2022
100
Item 12.
41
EXHIBIT 4
MONTHLY
COMPLIANCE STATUS
REPORT
Small and Minority Business
Participation
Completed reports must be submitted
as follows:
Beaufort County Compliance Office
P.O. Drawer 1228 • Beaufort, SC
29901-1228
E-Mail: dthomas@bcgov.net • FAX
843.255.9437
Prime
Contractor
Name:
Project Name:
Type of Report:
Report Number:
For the Period
Of:
Monthly
Final
Until the project ends, the Prime Contractor shall submit monthly reports to the Compliance Office by the 5 th
day, reflecting activity of the previous month.
Original Prime Contract Amount:
Change Orders to Date:
Current Prime Contract Amount:
Name of
S/MBE
Firm
Type
Quote
Amount
Date of
Contract/PO
Dollar Amount
of Actual
Contract/PO
Dollar
Amount
Paid This
Month
Check
Number
Dollar
Amount
Paid to
Date
SBE Expenditure to
Date:
MBE Expenditure to
Date:
S/MBE Total
Expenditure to Date:
I certify that contracts/purchase orders have been executed with the above firms, amounts listed are accurate,
and payments were made in accordance with contractual obligations. Cancelled checks to S/MBEs working on
this project and/or supporting documentation for the information presented in this report will be made available to
Beaufort County officials upon written request.
Name: Title:
Signature: Date:
Small and Minority Business Participation Program Documents – Beaufort County, South Carolina
Revised 2 February 2022 101
Item 12.
42
IFB#
100% LABOR AND MATERIAL PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS:
That as Principal, hereinafter called Principal, and
, of a corporation
organized and existing under the laws of the State of , as Surety, hereinafter called
Surety, are held and firmly bound unto Beaufort County, South Carolina as oblige herein below defined,
in the amount of dollars ($ )
for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrator,
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, Principal has by written agreement dated , 20
, entered into a Contract with County for:
In accordance with drawings and specifications prepared by Beaufort County, which contract is by
reference made a part hereof, and is hereafter referred to as the Contract.
NOW, THEREFORE, the condition of this obligation is such that if the Principal shall promptly make
payment to all claimants as is herein below defined for all labor and materials used or reasonable required
for use in the performance of the Contract, this obligation shall be void; otherwise, it shall remain in full
force and effect subject, however to the following conditions:
1. A claimant is defined as one having a direct contact with the principal or with a subcontractor of
the Principal for labor, material, or both, used or reasonably required for use in the performance of the
Contract, labor and material being construed to include that part of water, gas, power, light, heating oil,
gasoline, telephone service, rental of equipment, or repair of equipment directly applicable to the Contract.
2. The above-named Principal and Surety hereby jointly and severally agree with the County that
every claimant as herein defined, who has not been paid in full before the expiration of a period of ninety
(90) days after the date on which the last of such claimant's work or labor was done or performed, or
materials were furnished by such claimant, may sue on this bond for the use of such claimant, prosecute
the suit to final judgment for such sum or sums as may be justly due claimant, and have execution thereon.
The County shall not be liable for the payment of any costs or expenses of any such suit.
3. No suit or action shall be commenced hereunder by any claimant.
a. Unless claimant, other than one having a direct Contract with the Principal, shall have given
written notice to any two of the following: the Principal, the County, or the Surety above-
named, within ninety (90) days after such claimant did or performed the last of the work or
labor, or furnished the last of the materials for which said claim is made, stating with
substantial accuracy the amount claimed and the name of the party to whom the materials
were furnished, or for whom the work for labor was done or performed. Such notice shall be
102
Item 12.
43
served by mailing the same by registered mail or certified mail, postage prepaid, in an
envelope addressed to the Principal, County, or Surety, at any place where an office is
regularly maintained for the transaction of business or served in the state in which the
aforesaid project is located, save that such service need not be made by a public officer.
b. After one year from the completion of the Contract and the acceptance by County of the
work therefore, it being understand, however, that if any limitation embodied in this bond is
prohibited by any law controlling the construction hereof such limitation shall be deemed to
be amended so as to be equal to the minimum period of limitation embodied in this bond is
prohibited by any law controlling the construction hereof such limitation shall be deemed to
be amended so as to be equal to the minimum period of limitation permitted by such law.
c. Other than in a state court of competent jurisdiction in and for the county or other political
subdivision of the state in which the project, or any part thereof, is situated, or in the United
States District Court for the district in which the project, or any part thereof, is situated and
not elsewhere.
4. The amount of this bond shall be reduced by and to the extent of any payment or payments
made in good faith hereunder inclusive of the payment by Surety or mechanics' liens, which may be
filed of record against improvement, whether or not claim for the amount of such lien be presented
under and against this bond.
103
Item 12.
44
IFB#
NONCOLLUSION AFFIDAVIT OF SUBCONTRACTOR
State of )
) ss.
County of )
, being first duly sworn, deposes, and says that:
(1) He is (Owner, Partner, Officer, Representative, or Agent) of
, hereinafter referred to as the "Subcontractor;
(2) He is fully informed respecting the preparation and contents of the Subcontractor's
Proposal submitted by the Subcontractor to , the Contractor for certain work in
connection with the Contract pertaining to the Project in Beaufort
County, South Carolina;
(3) Such Subcontractor's Proposal is genuine and is not a collusive or sham Proposal;
(4) Neither the Subcontractor nor any of its officers, partners, owners, agents,
representatives, employees, or parties in interest, including this affiant has in any way colluded,
conspired, connived, or agreed, directly or indirectly, with any other Bidder, firm or person to
submit a collusive or sham Proposal in connection with such Contract or has in any manner, directly or
indirectly, sought by unlawful agreement or connivance with any other Bidder, firm, or person to fix the
price or prices in said Subcontractor's Proposal, or to secure through collusion, conspiracy, connivance,
or unlawful agreement any advantage against Beaufort County or any person interested in the proposed
Contract, and,
(5) The price or prices quoted in the Subcontractor's Proposal are fair and proper and are not
tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any
of its agents, representatives, owners, employees, or parties in interest, including this affiant.
Signed
Title
Subscribed and Sworn to before me this day of , 20 .
(SEAL)
Title
My Commission Expires
Date
104
Item 12.
45
General Conditions
105
Item 12.
46
STANDARD GENERAL PROVISIONS OF THE
BEAUFORT COUNTY, SOUTH CAROLINA CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Article 1 GENERAL PROVISIONS
1.1 Basic Definitions
1.2 Interpretation
Article 2 COUNTY
2.1 Provided by County
2.2 Right to Stop the Work
2.3 Right to carry Out the Work
Article 3 CONTRACTOR
3.1 Contractor’s Qualifications
3.2 Contractor’s Responsibility
3.3 Review of Contract Documents and Field Conditions by Contractor
3.4 Subsurface and Physical Conditions
3.5 Supervision and Construction Procedures
3.6 Labor and Materials
3.7 Contractors Warrantee
3.8 Taxes
3.9 Permits, Fees, and Notices
3.10 Supervision
3.11 Schedules Required of Contractor
3.12 Initial Acceptance of Schedules
3.13 As-Built Documents
3.14 Substitutions
3.15 Shop Drawings, Product Data and Samples
3.16 Use of Site and Clean Up
3.17 Access to Work
3.18 Hours of Work
3.19 Concealed or Unknown Conditions
3.20 Tests and Inspections
3.21 Acceptance
3.22 Indemnification
Article 4 ADMINISTRATION OF THE CONTRACT
4.1 Administration of the Contract by the County’s Designative Representative
4.2 Contractor Change Order Requests
4.3 Claims
4.4 Assertion of Claims
4.5 Time Limits and Timely Notice of Contractor Claims
4.6 Decision of County’s Representative on Claims
Article 5 SUBCONTRACTORS
5.1 Award of Subcontracts and Other Contracts for Portions of the Work
5.2 Separate Contractor Claims
Article 6 CONSTRUCTION BY COUNTY OR BY SEPARATE CONTRACTORS
6.1 County’s Right to Perform Construction and to Award Separate Contracts
6.2 Mutual Responsibility
6.3 County’s Right to Clean Up
Article 7 CHANGES IN THE WORK
7.1 Changes
7.2 Definitions
7.3 Change Order Procedures
7.4 Work Change Directive
7.5 Unit Price Work
106
Item 12.
47
7.6 Waiver
Article 8 CONTRACT TIME
8.1 Commencement of the Work
8.2 Progress and Completion
8.3 Delay
8.4 Adjustment of Contract Time
8.5 Weather Delays
8.6 Delays Beyond Contractor Control
8.7 Delays Within Contractor Control
8.8 Delays Beyond County’s and Contractor’s Control
8.9 Liquidated Damages
8.10 Waiver
Article 9 PAYMENTS AND COMPLETION
9.1 Unit Price Work
9.2 Schedule of Values
9.3 Progress Payments
9.4 Application for Payment
9.5 Certificate for Payment
9.6 Retention
9.7 Beneficial Occupation
9.8 Substantial Completion
9.9 Final Completion and Payment
Article 10 PROTECTION OF PERSONS AND PROPERTY
10.1 Safety Precautions and Programs
10.2 Safety of Persons and Property
10.3 Emergencies
Article 11 INSURANCE AND BONDS
11.1 Contractors Insurance
11.2 Insurance Certificates
11.3 Waiver of Rights
11.4 Receipt and Application of Insurance Proceeds
11.5 Performance Bond and Labor/Material Bond
Article 12 UNCOVERING AND CORRECTION OF WORK
12.1 Uncovering of Work
12.2 Correction of Defective Work
12.3 Warranty Period
12.4 Warranty Inspection
Article 13 TERMINATION OR SUSPENSION OF THE CONTRACT
13.1 Suspension of Work
13.2 Termination by the County for Cause
13.3 Termination by the County for Convenience
13.4 Termination for Non-Appropriations
Article 14 MISCELLANEOUS PROVISIONS
14.1 Governing Law
14.2 Successors and Assigns
14.3 Rights and Remedies
14.4 Survival
14.5 Complete Agreement
14.6 Severability of Provisions
14.7 Notices
14.8 Patents and Royalties
Article 15 STATUTORY LANGUAGE REQUIREMENTS
15.1 Scope
15.2 Affirmative Action
107
Item 12.
48
ARTICLE 1
GENERAL PROVISIONS
1.1 BASIC DEFINITIONS
APPLICABLE CODE REQUIREMENTS - The term “Applicable Code Requirements” means all laws, statutes, the
most recent building codes, ordinances, rules, regulations, and lawful orders of all public authorities having
jurisdiction of the County, Contractor, and Subcontractor, the Project site, the Work, or the prosecution of the Work.
APPLICATION FOR PAYMENT - The term “Application for Payment” means the submittal from the Contractor
wherein payment for certain portions of the Work is requested in accordance with Article 9.
BIDDER – The term “bidder” means one who submits a Bid directly to Owner, as distinct from a sub- bidder, who
submits a bid to a Bidder.
BENEFICIAL OCCUPANCY - The term “Beneficial Occupancy” means the County’s right to make use of or
otherwise occupy any part of the Work in accordance with Article 9.
CERTIFICATE FOR PAYMENT - The term “Certificate for Payment” means the approval of Contractor
Application for Payment in accordance with Article 9.5.
CHANGE ORDER - The term “Change Order” means a Contract Document authorizing one of more of the
following: a change in the Work, and adjustment in the Contract Sum, an adjustment in the Contract Time in
accordance with Article 9.
CLAIM – See paragraph 4.3, Claims, of the General Conditions.
CONTRACT - The terms “Contract” means the written agreement between the Contractor and the County set forth
in the Contract Documents.
CONTRACT DOCUMENTS - The “Contract Documents” consist of all documents listed in Article 5 of the
Agreement.
CONTRACT MODIFICATION - The term “Contract Modification” means an executed Change Order.
CONTRACT PRICE - The term “Contrast Price” means the amount of compensation payable by the County for
completion of the Work in accordance with the Contract Documents.
CONTRACT SCHEDULE - The term “Contract Schedule” means the graphical representation of a practical plan
to complete the Work within the Contract Time in accordance with Article 3.
CONTRACT TIME - The term “Contract Time” means the number of days set forth in the Agreement within which
full completion of the Work must be achieved.
CONTRACTOR - The term “Contractor” means the person of firm identified as such in the Agreement and is
referred to throughout the Contract Documents as if singular in number.
COUNTY – The term “County” means Beaufort County, South Carolina.
COUNTY’S REPRESENTATIVE – The term “County’s Representative” means the person or firm identified as
such in the Agreement.
DAY - The term “day” as used in the Bidding Requirements and the Contract Documents shall mean calendar day,
unless otherwise specifically stated.
108
Item 12.
49
DEFECTIVE WORK - The term “defective Work” means work that is unsatisfactory, faulty, omitted, incomplete,
deficient, or does not conform to the requirements of the Contract Documents, directives of the County’s
Representative, or the requirements of any inspection, reference standard, test, or approval specified in the Contract
Documents.
DRAWINGS - The term “Drawings” means the graphic and pictorial portions of the Contract Documents showing
the design, location, and dimensions of the Work, generally including plans, elevations, sections, details, schedules,
and diagrams. The Drawings are listed in the List of Drawings.
EXCUSABLE DELAY – The term “Excusable Delay” means a delay that entitles the Contractor to an adjustment
of the Contract Time but not an adjustment to the Contract Price, pursuant to Articles 7 and 8 of the General
Conditions.
EXTRA WORK – The term “Extra Work” means Work beyond or in addition to the Work required by the original
Contract Documents, pursuant to Article 7 of the General Conditions.
FIELD ORDER – The term “Field Order” means a written order by the County which requires minor changes in
the Work but does not involve a change in the Contract Price or Contract Times.
FINAL COMPLETION - The term “Final Completion” means the point at which the Work has been fully completed
in accordance with the Contract Documents as determined by the County Engineer.
GENERAL CONDITIONS - The term “General Conditions” refers to the General Conditions of the Construction
Contract, as included in the Contract Documents.
GENERAL REQUIREMENTS – The term “General Requirements” means the General Requirements of the
Specifications which is the part of the Contract Document which amends or supplements the General Conditions
with regard to Specifications.
PROJECT - The term “Project” means the total construction of which the Work performed under the Contract
Documents may be the whole or part and which may include construction by separate contractors and/or the County.
The Project may be identified by name, location, and/or project number in the Contract Documents.
SEPARATE CONTRACTOR - The TERM “Separate Contractor” means a person or firm under separate contract
with the County performing other work at the project site which affects the Work performed under the Contract
Documents.
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES - See Paragraph 3.11, Shop Drawings, Product data, and
Samples, of the General Conditions
SPECIFICATIONS - The term “Specifications” means that portion of the Contract Documents consisting of the
written requirements for materials, equipment, construction systems, standards and workmanship for the work, and
performance of related services.
SUBCONTRACTOR - The term “Subcontractor” means a person or firm that has a contract with the Contractor or
with a Subcontractor to perform a portion of the Work. Unless otherwise specifically provided, the term
Subcontractor includes subcontractors of al tiers.
SUBSTANTIAL COMPLETION - See Paragraph 9.8, Substantial Completion, of the General Conditions
SUCCESSFUL BIDDER – The term “Successful Bidder” means the lowest, qualified, responsible and responsive
Bidder to whom Owner makes an award.
SUPERINTENDENT - The term “Superintendent” means the person designated by Contractor to represent
Contractor at the Project site in accordance with Article 3.
109
Item 12.
50
TIER - The term “tier” means the contractual level of a Subcontractor or supplier with respect to the Contractor. For example,
a first-tier Subcontractor is under subcontract with the Contractor, or a second- tier Subcontractor is under subcontract with
the first-tier Subcontractor, and so on.
UNEXCUSABLE DELAY - The term “Inexcusable Delay” means a delay that does not entitle the Contractor to an
adjustment of the Contract Sum and does not entitle the Contractor to an adjustment of the Contract Time.
WORK - The term “Work” means the construction and services required by the Contract Documents as modified by Change
Order, whether completed or partially completed, and includes all labor, materials, equipment, tools, and services provided
or to be provided by Contractor to fulfill Contractor’s obligations. The Work may constitute the whole or a part of the project.
WORK CHANGE DIRECTIVE – See paragraph 7.4, Work Change Directive, of the General Conditions.
1.2 Contract Document Interpretation
A. The Contract Documents are complementary and what is called for by one shall be as binding as if called for by all.
except as may be otherwise stated in the Contract Documents, the provisions of the Contract Documents shall take
precedence in resolving any conflict, error, ambiguity, or discrepancy betwee n the Contract Documents and the
provisions of any standard, specification, manual, code or instruction incorporated by reference into the Contract
Documents , or the provisions of any Laws or Regulations applicable to the performance of the Work unless such an
interpretation would result in violation of such Law or regulation. If there is any conflict between the provisions of the
Contract Documents and any referenced provisions, the language of the Contract Documents will take precedence over
that of any standard specification, manual or code.
B. The following order of precedence shall govern the resolution of any disputes or ambiguities arising from this
contract and the mutual intent of the parties (in order of priority). The Beaufort County Procurement Code will prevail
over the Special Supplementary Conditions of this contract. Special and Supplementary Conditions of this contract will
prevail over the standard form of agreement; the modified standard form of agreement shall prevail over the
specifications, and the specifications shall prevail over the drawings and general conditions.
C. The Contract Documents are intended to include and require all items which are necessary for the proper execution
and completion of the Work.
D. Interpretations of the Drawings and Specifications and their intent, which are necessary to the proper execution, and
completion of the Work will be made by the County’s Representative or Architect/Engineer. Words which have well
known technical or trade meanings are to be interpreted in accordance with such recognized meanings. Contractor shall
refer issues concerning interpretation and compliance with the contract documents and plans and specifications to the
County’s Representative in writing, or the arc hitect/engineer in writing. The County’s Representative or
Architect/Engineer will review such requests with reasonable promptness and within any time limits agreed upon. The
County may consider the interpretation and decision of the Architect/Engineer and issue a decision after consultation
with the Architect/Engineer. Failure by the claimant to give written notice as set forth above within thirty days shall
result in Architect/Engineer’s decision being final and binding upon the County and Contractor. The County’s decision
shall be final.
E. The organization of the Specifications into divisions, sections, or articles, and the arrangement of the Drawings shall
not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of work to be
performed by any trade.
F. In the event of an inconsistency between Drawings and Specifications or within either document, the better quality
or greater quantity of work shall be provided, at no additional cost to the Owner.
110
Item 12.
51
ARTICLE 2
COUNTY
2.1 Provided by the County
The County shall furnish survey’s describing the physical characteristics and legal limitations required to perfor m
the Work. The Contractor shall be responsible for laying out the Work, shall protect and preserve the established
reference points and property monuments, and shall make no changes or relocations without the prior written approval of
the County. Contractor shall report to the County’s representative or Engineer whenever any reference point or property
monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be
responsible for the accurate replacement or relocation of such reference points or monuments by professionally qualified
personnel. As for utility locations for the contract site, the Contractor is encouraged to contact independent utility locators,
such as Palmetto Utility Locations (1-800-922-0983), to verify and locate utilities. The Contractor shall bear all costs and
all risks for proper location and/or damage or destruction to utilities in place.
2.1 Right to Stop the Work
The County may at any time and without cause suspend the Work or any portion thereof by notice in writing to the
Contractor which will fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed.
Contractor shall be allowed an extension of the Contract Times.
2.2 Right to Carry Out the Work
If the Contractor fails to carry out the Work in accordance with the Contract Documents, fails to provide sufficient labor,
materials, equipment, tools, and services to maintain the Contract Schedule, or otherwise fails to comply with any material
term of the Contract Documents, and fails within 2 working days after receipt of notice from the County to promptly
commence and thereafter diligently continue to completion the correction of such failure, the County may, without
prejudice to other remedies the County may have, correct such failure at Contractor’s expense. In such case, the County
will be entitled to deduct from payments then or thereafter due Contractor the cost of correcting such failure, including
compensation for the additional services and expenses of the County’s Representative, Engineer, and County’s consultants
made necessary thereby. If payments then or thereafter due Contractor are not sufficient to cover such amounts, Contractor
shall pay the additional amount to the County.
ARTICLE 3
CONTRACTOR
3.1 Contractor’s Qualifications
Offeror must, upon request of the County, furnish satisfactory evidence of their ability to furnish products or services in
accordance with the terms and conditions of this qualification. The Purchasing Department reserves the right to make the
final determination as to the offeror’s ability to provide the services requested herein, before entering into any contract.
3.2 Contractor’s Responsibility
Each offeror shall fully acquaint himself with conditions relating to the scope and restrictions attending the execution of
the work under the conditions of this qualification. It is expected that this will sometimes require on-site observation. The
failure or omission of an offeror to acquaint himself with existing conditions shall in no way relieve him of any obligation
with respect to this qualification or to the contract.
3.2.1 The Contractor will be required to assume sole responsibility for the complete effort, as required by this solicitation.
The County will consider the Contractor to be the sole point of contact with regard to contractual matters.
3.3 Review of Contract Documents and Field Conditions by Contractor
A. The Contractor shall carefully study and compare each of the Contract Documents with the others and with the
information furnished by the County, and shall promptly report in writing to the County’s Representative any errors,
inconsistencies, or omissions in the Contract Documents. Contractor shall take field measurements, verify field conditions,
and carefully compare with the Contract Documents such field measurements, conditions, and other information known to
the Contractor before commencing Work. If the Contractor performs any construction activity which Contractor knows or
should know involves an error, inconsistence, or omission without notifying and obtaining the written consent of the
County’s Representative, the Contractor shall be responsible for the resultant losses, including without limitation, the costs
of correcting the Work.
B. Contractor shall be responsible for all direct costs to County resulting from Contractor’s errors and omissions in his
interpretation of construction documents and the performance or work under the Contract Document, or those of his
subcontractors and suppliers, and shall be responsible for all additional Architect/Engineer fees and other costs related to
111
Item 12.
52
correcting such errors and omissions. Such additional costs shall include Architect/Engineer Punch List, inspection(s) or
the Building Codes Enforcement inspections, as such, re -inspections are made necessary where no Certificate of
Substantial Completion and/or Occupancy Permit could be issued because of Contractor’s unsatisfactory performance or
preparation on the date the original inspection was scheduled and performed.
C. County shall furnish to Contractor one (1) copy of the Contract Documents. Additional copies will be furnished, upon
request, at the cost of reproduction.
3.4 Subsurface and Physical Conditions
A. Reports and Drawings: The Supplementary Conditions identify:
• those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used
in preparing the Contract Documents; and
• those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to
the Site (except Underground Facilities) that Engineer has used in preparing the Contract Documents.
B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the general accuracy of the
“technical data” contained in such reports and drawings, but such reports and drawings are not Contract Documents.
Such “technical data” is identified in the Supplementary Conditions. Except for such reliance on such “technical data,”
Contractor may not rely upon or make any Claim against County, County’s Architect/Engineer, or any of
Architect’s/Engineer’s Consultants with respect to:
• the completeness of such reports and drawings for Contractor’s purposes, including, but not limited to, any aspects
of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and
safety precautions and programs incident thereto; or
• other data, interpretations, opinions, and information contained in such reports or shown or indicated in such
drawings; or
• any Contractor interpretation of or conclusion drawn from any technical data or any such other data, interpretations,
opinions, or information.
3.5 Supervision and Construction Procedures
Contractor shall supervise, coordinate, and direct the Work using Contractor’s best skill and attention. Contractor shall be
solely responsible for and have control over construction means: methods, techniques, sequences, procedures and the
coordination of all portions of the Work. Contractor shall be responsible to the County for acts and omissions of
Contractor’s agents, employees, and Subcontractors, and their respective agents and employees. Contractor shall not be
relieved of Contractor’s obligations t o perform the Work in accordance with the Contract Documents either by acts or
omissions of the County or County’s Representative in the administration of the Contract, or by tests, inspections, or
approvals required or performed by persons or firms other than the Contractor. Contractor shall be responsible for
inspection of all portions of the Work, including those portions already performed under this Contract, to determine that
such portions conform to the requirements of the Contract Documents and are r eady to receive subsequent Work.
Contractor shall at all times maintain good discipline and order among its employees and Subcontractors. Contractor shall
provide competent, fully qualified personnel to perform the Work.
3.6 Labor and Materials
The Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery,
water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of th e
Work in accordance with the Contract Documents. Only manufactured and farm products of the United States, preferably
in the State of South Carolina shall be used as materials in the prosecution of the Work under this contract. Contractor
shall warrant that all equipment and materials provided under this Contract are new, merchantable, and fit for the purpose
intended.
3.7 Contractor Warrantee
Contractor warrants to the County that all materials furnished under this Contract will be of good quality, new, and free of
liens, claims, and defects, and that the Work will conform professional standards of care and practice in effect at the time
the Work is performed, be of the highest quality, and free from all faults, defects or errors and in compliance with the
requirements of the Contract Documents. If the Contractor is notified in writing of a fault, deficiency or error in the Work
provided within (1) one year of final payment for the Work, the Contractor shall, at the County’s option, either re-perform
such portions of the Work to correct such fault, defect or error, at no additional cost to the County , or refund to the
County, the charge paid by the County , which is attributable to such portions of the faulty, defective or erroneous Work,
112
Item 12.
53
including costs for re-performance of the Work provided by other Contractors.
3.8 Taxes
The Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid by the contractor. The County,
as a public body, is not exempt from South Carolina State Sales and Use Taxes on materials and equipment incorporated
in the Work, and said taxes shall be included in the Unit Price. Contractor is responsible for obtaining and executing the
forms necessary for claiming the exemption.
3.9 Permits and Fees
Unless otherwise provided in the Supplemental Conditions, the Contractor shall obtain and pay for all permits, licenses,
and certificates required for the proper execution and completion of Work under this Contract. When electrical, water,
and/or gas servi ce is included in the specifications, everything necessary to make the system operational, including any
and all utility company connection/equipment charges, shall be included in the bid. This shall apply even when permit fees
are waived. Contractor shall , at its own expense, meter and pay the cost of the water supply, electrical, light and power,
heat, and telephone services during construction of the project. Connection to existing facilities for temporary services and
their distribution for the construction work shall be installed in a manner and location subject to approval of the owner.
When temporary service lines and meters are no longer required, they shall be removed by the Contractor. Any part of the
permanent service lines, grounds, and buildings of the permanent service lines, grounds, and buildings are disturbed or
damaged by the installation and/or removal of the temporary service lines, they shall be restored to their original condition
by the Contractor in an amount satisfactory and subject to the County’s approval.
3.10 Supervision
Contractor shall supervise, inspect, and direct the Work completely and efficiently, devoting such attention thereto and
applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents.
Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction, but
Contractor shall not be responsible for the negligence of the County or the Engineer in the design or specification of a
specific means, method, sequence, or procedure of construction which is shown or indicated in and expressly required by
the Contract Documents. Contractor shall be responsible to see that the complete Work complies accurately with the
Contract Documents.
3.11 Schedules Required of the Contractor
A. Contractor shall start Work no later than ten (10) days after receipt of the Notice to Proceed. Before the commencement
of Work, the Contractor shall submit a computerized schedule of the work necessary to complete the project to the County’s
Representative for review at the time of the pre- construction meeting. Approved computer formats are Microsoft Project,
SureTrac/Primavera or approved equal. The Estimated Progress Schedule as submitted by Contractor for review by the
County’s Representative shall provide an orderly progression of the Work to completion within the Contract Time, and
shall indicate starring and completion dates for the various stages of the Work. The dates so indicated on the schedule are
hereby made time of the essence.
• Contractor shall provide a monthly update to the progress schedule to the County’s Representative. All costs for
furnishing and updating the progress schedule shall be included in the price bid.
B. The preliminary progress schedule and updated progress schedules shall represent a practical plan to complete the
Work within the Contract Time. Extension of any schedule beyond the Contract Time shall not be acceptable. Schedules
showing the Work completed in less than the Contract Time, may be acceptable if judged by County’s Representative to
be practical, however acceptance of such a schedule shall not change the Contract Time. The Contract Time, not the
schedule time, shall control in the determination of liquidated damages payable by Contractor under Article 8 of the
Agreement in the determination of any delay under Article 8 of the General Conditions.
C. If a schedule showing the Work completed in less than the Contract Time is accepted, Contractor shall not be entitled
to extensions of the Contract Time for Excusable Delays until such delays extend the completion of the Work beyond the
expiration of the Contract Time.
D. Contractor shall provide a separate schedule for the submittal of shop drawings and samples for County approvals.
The preliminary schedule of Shop Drawings shall include a list of proposed Shop Drawings with the proposed time of
submission for each keyed t o the estimated progress schedule described in these General Conditions. The Schedule of
Shop Drawings shall be adjusted, if necessary, to reflect any changes in the estimates on the adjusted progress schedule.
E. Contractor shall provide a preliminary schedule of values for all of the Work which includes quantities and prices of
items, when added together, equal the Contract Price and subdivides the Work into component parts in sufficient detail to
serve as the bas is for progress payments during performance of the Work. For each Work item and monthly period, the
113
Item 12.
54
estimated percentage completion shall be tabulated. Unit Price Work shall be estimated based upon quantities given in the
Bid Form. The total percentage for each Work item should equal 100 percent.
• The schedule of values shall be adjusted during the performance of the Work, if necessary, to reflect actual and
estimated conditions.
3.12 Initial Acceptance of Schedules
A. Unless otherwise provided in the Contract Documents, at least ten days before submission of the first Application for
Payment a conference attended by Contractor, County’s Representative, and others as appropriate will be held to review
for acceptability to County’s Representative as provided below the schedules submitted in accordance with paragraph 3.8
B. Contractor shall have an additional ten days to make corrections and adjustments and to complete and resubmit the
schedules. No progress payment shall be made to Contractor until acceptable schedules are submitted to County’s
Representative.
• The progress schedule will be acceptable to County’s Representative if it provides an orderly progression of the
Work to completion within any specified Milestones and the Contract Times. Such acceptance will not impose
on County’s Representative responsibility for the progress schedule, for sequencing, scheduling, or progress of
the Work nor interfere with or relieve Contractor from Contractor’s full responsibility therefore.
• Contractor’s schedule of Shop Drawing and Sample submittals will be acceptable to County’s representative if it
provides a workable arrangement for reviewing and processing the required submittals.
• Contractor’s schedule of values will be acceptable to County’s Representative as to form and substance if it
provides a reasonable allocation of the Contract Price to component parts of the Work.
3.13 As Built Documents
Contractor shall maintain one set of As-Built drawings and specifications at the project site, which shall be kept up to date
during the Work of the Contract. All changes which are incorporated into the Work which differ from the documents as
drawn and written shall be noted on the As-built set. Notations shall reflect the actual materials; equipment and installation
methods used for the Work and each revision shall be initialed and dated the Contractor’s Superintendent.
3.14 Substitutions
A. Bids shall be based on the exact materials specified. The specified products have been used in the design of the Project
and in the preparation of the Drawings and Specifications, and as such establish minimum standards of function, dimension,
appearance, and quality necessary for the Project. Equivalent products of other manufacturers may be acceptable, if, in the
judgment of the County’s Representative or Architect/Engineer, they meet the standards of the Specifications. The burden
of proof of equality rests with the Contractor. The Contractor shall submit in writing any requests for substitutions. Shop
Drawings that are submitted to the Architect do not constitute a request for substitution. Materials not specified or accepted
as equivalent shall not be acceptable for installation.
B. Unless the specifications or description provides for “or equal”, “equivalent”, or other similarly descriptive words, the
Contractor shall provide the material or items as specified. Contractor may submit, by written application, items for
County’s Representative or Architect/Engineer review as “equal” if:
• In the County Representative’s or Architect’s/Engineer’s sole discretion, an item is functionally equal to and
similar in that no change to the Work will be required, it may be considered by the County’s Representative or
Architect/Engineer as an “equal” i tem, in which instance review and approval of the proposed item may, in the
County Representative’s or Architect’s/Engineer’s sole discretion be accomplished without compliance to some
or all of the requirements for approval of substitute items. In such cases the item shall be determined by the
County Representative or Architect/Engineer to be at least equal in quality, durability, strength, appearance, and
design criteria, and it will meet the design performance requirements equally well, and Contractor certifies that
there is: i) no increase in cost to the County, and (ii) it will conform to the requirements of the item named in the
Contract Documents.
C. Prior to initiating the written application required under paragraph 3.12B of the General Conditions, Contractor shall
briefly outline the proposed substitute to the extent necessary for the County’s Representative or Architect/Engineer, if
deemed appropriate by the County’s Representative or Architect/Engineer, to estimate the cost of engineering services for
any redesign which may be required for evaluating a proposed substitute. The County Representative’s or
Architect’s/Engineer’s estimate shall be inco rporated in the Contractor’s application for the proposed substitute in the
itemization of estimated costs required in accordance with paragraph 3.12B of the General Conditions. The County
Representative’s or Architect’s/Engineer’s estimate will also serve to advise Contractor of the reimbursement to County
when evaluation so indicates.
114
Item 12.
55
3.15 Shop Drawings and Samples
A. Contractor shall submit six (6) copies of Shop Drawings to the County’s Representative for review and approval in
accordance with the schedule of Shop Drawing and Sample Submittals. Contractor shall also submit Samples to the
County’s Representative, in accordance with the schedule of Shop Drawing and Sample Submittals. Contractor shall have
determined and verified fit, form, function, performance criteria, and coordinated each Shop Drawing or Sample with the
other Shop Drawings or Samples and with the requirements of the Work and the Contract Documents. By approving and
submitting Shop Drawings, Product Data, Samples, and similar submittals, Contractor represents that it has determined or
verified materials and field measurements and conditions related thereto, and that it has checked and coordinated the
information contained within such submittals with the requirements of the Contract Documents and Shop Drawings for
related Work.
B. Any Work performed prior to County’s Representative review and approval of the pertinent submittal will be at the
sole expense and responsibility of the Contractor. The Contractor shall submit structural, mechanical, and electrical shop
drawings in the form of one sepia and three black or blue line prints; all other shop drawings in the form of one sepia and
two black or blue prints.
C. Contractor shall not be relieved of the responsibility for deviations from the requirements of the Contract Documents
by County Representative’s review of Shop Drawings, Product Data, Samples or other similar submittals, unless
Contractor has specifically informed County’s Representative at the time of the submittal and County’s representative has
given written approval of the specific deviation. Contractor shall not be relieved of responsibility for errors or omissions
in Shop Drawings, Product Data, Samples, or similar submittals by County Representative’s review, acceptance, comment,
or approval thereof.
D. Final approval of all materials shall be contingent on Shop Drawing acceptance, compliance with the Specifications
and performance criteria, and acceptable installation. General approval to utilize a product does not relieve the supplier or
Contractor of meeting Specification requirements.
E. Other submittals required under the Contract Documents shall be made in the same number of copies as required for
Shop Drawings, unless otherwise indicated.
3.16 Use of Site and Clean Up
The Contractor shall confine operations at the project site to areas permitted by the Construction Documents. Contractor
shall, during the performance of the Work keep the project site and surrounding area free from accumulation of waste
materials and rubbish cause by Contractor. Contractor shall not unreasonably encumber the Project site with materials or
equipment. Contractor shall remove all waste material and rubbish cause by the Contractor; tools; equipment; machinery;
and surplus materials from the project site and surrounding area at the completion of the Work.
3.17 Access to Work
The County’s Representative, employees, and consultants and other persons authorized by the County shall at all times have
access to the Work whenever it is in progress.
3.18 Hours of Work
The hours of Work for the Project shall be consistent with the hours of normal operation of the Beaufort County Engineer,
unless otherwise specified within the Supplemental Conditions. That is Monday through Friday from 8:00 a.m. to 5:00
p.m. The County En gineer may agree to waive these time requirements upon written request from the Contractor. The
Contractor is made aware that the hours accumulated by the Engineer and/or his staff process, working, or otherwise
attending to the Contract as it relates to o vertime hours generated by the Contractor’s work hours or delinquencies, shall
be assessed to the Contractor. The Beaufort County pay scale will govern with County employees wage rates as applicable.
Reimbursement would be processed as a contract reduction via a supplemental agreement or Change Order.
3.19 Concealed or Unknown Conditions
A. Except and only to the extent provided otherwise in Articles 7 and 8 of the General Conditions, by signing the
Agreement, Contractor agrees:
• To bear the risk of concealed or unknown conditions, if any, which many be encountered in performing the
Contract; and
• That Contractor’s bid for the Contract was made with full knowledge of this risk.
In agreeing to bear the risk of concealed or unknown conditions, Contractor understands that, except and only to the extent
115
Item 12.
56
provided otherwise in Articles 7 and 8, concealed and/or unknown conditions shall not excuse Contractor from its
obligation to achieve full completion of the Work within the Contract Time, and shall not entitle the Contractor to an
adjustment of the Contract Sum.
B. Any information provided pursuant to INFORMATION AVAILABLE TO BIDDERS is subject to the following
provisions: The information is made available for the convenience of Bidders and is not parts of the Contract. The County
has not determined the accuracy or completeness of such information, and all such information is made available to Bidders
without a representation or warranty by the County whatsoever as to its accuracy, completeness, or relevancy. Bidders
shall independently evaluate such information for their use and shall be solely responsible for use or interpretation of such
information. Any such use or interpretation shall not be the basis of any claim against County.
C. If concealed or unknown conditions are encounter which require, in opinion of County’s Representative, design details
which differ from those design details shown in the Contract Documents and the County’s Representative finds that such
revised design details will cause an increase or decrease in the cost of, or time required for performance of the Contract,
and if County agrees with County Representative’s determinations, County will issue a Change Order modifying the
Contract terms to provide for the change in design details and to provide for an adjustment in the Contract Sum and/or
Contract Time pursuant to Articles 7 and 8.
D. If Contractor encounters concealed or unknown conditions that differ materially from those anticipated or expected,
Contractor shall immediately notify County’s Representative in writing of such conditions so that County’s Representative
can determine if such conditions require design details which differ from those design details shown in the Contract
Documents. Contractor shall be liable to County for any extras costs incurred as the Contractor’s failure to promptly give
such notice.
3.20 Test and Inspections
The Contractor shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests,
or approvals required by Contract Documents, unless other specified in the Supplemental Conditions. All inspections, tests
or approvals other than those required by Laws or Regulations of an y public body having jurisdiction shall be performed
by and organization acceptable to the County, Contractor, and Engineer. Engineer will receive and review certificates of
inspection, tests, or approvals which are submitted in accordance with the Contrac t Documents, but such review will be
only to determine that their content complies with the requirements of, and the certified results indicate compliance with,
the Contract Documents.
3.21 Acceptance
The Work under this agreement shall remain the property of and responsibility of the Contractor until it is accepted by the
County. The Contractor shall be liable for any and all damages and losses to the Project (weather by fire, theft, vandalism,
hurricane, earthquake, flood, or otherwise) prior to the County’s acceptance as fully completed. In the event the Work
furnished under this Agreement is found to be defective or does not conform to the specifications, the County reserves the
right to cancel the Agreement upon written notice to the Contractor.
3.22 Indemnification
Contractor shall indemnify and save harmless the County, its officers, agents, and employees from and against all liability,
loss, costs, claims, damages, judgments, and awards, whether or not covered by insurance, arising or claimed to have
arisen: (a) or in part from acts or omissions of, or as a result of Work done or omitted from being done by Contractor,
Subcontractors or assignees and their agents or employees, which resulted in: (1) injury to (including mental or emotional)
or death of any person, including employees of the County or Contractor, or (2) damage to or destruction of any property,
real or personal, including without limitation property of the County, County’s employees and fellow employees; (b) out
of injuries sustained and/or occupational diseases contracted by Contractor’s, its subcontractor’s, or assignee’s employees,
if any, of such a nature and arising under such hereto, of the state having jurisdiction, including all claims and causes of
action of any character against the County by any employee of Contractor, its subcontractors or assignees, or the employer
of such employees, or any person or concern claiming by, under or actions or disputes asserted by any subcontractors,
employees or suppliers of Contractor. Indemnification shall include all costs including attorney’s fees reasonably incurred
in pursuing indemnity claims under or enforcement of the Contract.
116
Item 12.
57
ARTICLE 4
ADMINISTRATION OF THE CONTRACT
4.1 County’s Representative
A. The County’s Representative will provide administration of the Contract as provided in the Contract Documents and
will be the representative of the County. The County’s Representative will have the authority to act on behalf of the County
only to the extent provided in the Contract Documents. The County’s Representative will not have control over, be in
charge of, and will not be responsible for construction means, methods, techniques, sequences, or procedures, or for safety
precautions and programs in connection with the Work, since these are solely the Contractor’s responsibility. Based on the
County’s Representative’s site visits and evaluations of Contractor’s Applications for Payment, the County’s
Representative will recommend amounts, if any due Contractor and will issue approval for payment in such amounts.
However, no actions taken during such site visits shall relieve the Contractor of the Contractor’s obligations as described
in the Contract Documents. The County’s Representative will have authority to reject the Work, or any portion there of,
which does not conform to the Contract Documents. The County’s Representative will have the authority to stop the
Work or any portion thereof. The County’s Representative will be, in the first instance, the interpreter of the
requirements of the Contract Documents and the judge of performance thereunder by the Contractor. Should the Contractor
discover and conflicts, omissions, or errors in the Contract Documents: have questions about the interpretation or
clarification of the Contract Documents ; question whether Work is within the scope of the Contract Documents; or
question that Work is not sufficiently detailed or explained, then before proceeding with the Work affected, the Contractor
shall notify the County’s Representative in writing and req uest interpretation, clarification, or furnishing of additional
detailed instructions. The County’s Representative response to questions and requests for interpretations, clarifications,
instructions, or decisions will be made with reasonable promptness. Should the Contractor proceed with the Work affected
before receipt of a response from the County Representative’s interpretations, clarifications, instructions, or decisions shall
be removed or replaced and Contractor shall be responsible for all resultant rework and/or losses.
B. If County and Architect/Engineer agree, Architect/Engineer will furnish a Resident Project Representative to assist in
providing more extensive observation of the Work. The duties, responsibilities and limitations of any Resident Project
representative and assistants furnished by the Architect/Engineer are as set-forth in Exhibit SC-A, “A Listing of the Duties,
Responsibilities and Limitations of Authority of the Resident Project Representative” which is attached hereto and made
a part hereof.
4.2 Contractor Change Order Request
Contractor may request changes to the Contract Sum and/or Contract Time for Extra Work or Delays to completion of the
Work caused by the acts, errors, or omissions of the County, County’s Representative, their agents or employees, or caused
by unforeseen conditions if, and only if Contractor follows the procedures specified in this Paragraph 4.2. As used in this
Paragraph 4.2. Such acts, errors, or omissions shall include, but not be limited to, the provision of clarifications, drawings,
instructions, or in terpretations that involve Extra Work or delay completion of the Work. If Contractor asserts that
Contractor is entitled to an adjustment of the Contract Sum and/or the Contract Time as the result of an act, error, or
omission of the County, the County’s Representative, their agents or employees, or as the result of unforeseen conditions,
then Contractor may submit a Change Order Request to County’s Representative. A Change Order Request must state that
it is a Change Order Request, state and justify the reason for the request, aid specify the amount of any requested adjustment
to the Contract Sum and/or Contract Time. Upon request of County’s Representative, Contractor shall submit such
additional information concerning the Change Order Request as may be requested by County’s Representative for the
purpose of evaluating the Change Order Request. If the Change Order Request seeks an adjustment of the Contract Sum
for delay, upon request of County’s Representative, Contactor shall submit written documentation demonstrating
Contractors’ entitlement to such an adjustment under Article 8. A condition precedent to obtaining an adjustment of the
Contract Sum and/or Contract Time as a result of an act, error, or omission of the County, the County’s Representative,
their agents or employees, or as the result of an unforeseen condition, is timely submission of a Change Order Request that
meets the requirements set forth above. A Change Order Request based upon such acts, errors or omissions will be deemed
timely submitted, if and only if, it is submitted within 3 working days of the date the Contractor discovers, or reasonably
should discover that an act, error, or omission of the County, the County’s Representative, their agents or employees, has
occurred that may en title Contractor to an adjustment of the Contract Sum and/or Contract Time (even if the Contractor
has not been damaged, delayed, or incurred extra cost when the Contractor discovers, or reasonably should discover, the
act, error or omission giving rise to the Change Order Request). A Change Order Request based upon an unforeseen
condition will be deemed timely Submitted if, and only if, it is submitted within 3 working days of the date the Contractor
discovers, or reasonably should discover , the existence of an unforeseen condition that may entitle Contractor to an
117
Item 12.
58
adjustment of the Contract Sum and/or Contract Time (even if the Contractor has not been damaged, delayed, or incurred
extra cost when the Contractor discovers, or reasonably should discover, the unforeseen condition giving rise to the Change
Order Request). If County’s Representative issues a final decision on all or part of Change Order Request, the Contractor
may contest the decision by filing a timely Claim under the procedures specified below. A final decision is any decision
on a Change Order Request which states that it is final. Failure of the claimant to give written notice as set forth above
within thirty days shall result in the County representative’s decision being final and binding upon County and Contractor.
4.3 Claims
The term “Claim” means a written demand or assertion by Contractor seeking an adjustment or interpretation of the terms
of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents,
including a determination of disputes or matters in question between County and Contractor arising out of or related to the
Contract Documents or the performance of the Work, and claims alleging an unforeseen condition or an act , error, or
omission by County, County’s Representative, their agents or employees.
If a Claim is subject to the procedures specified in Paragraph 4.2, the Claim arises upon the issuance of a written final
decision denying in whole or in part Contractor's Change Order Request. If a Claim is not subject to the procedures
specified in Paragraph 4.2, the Claim arises when the Contractor discovers, or reasonably should discover, the condition
or event given rise to the Claim (even if the Contractor has not been damaged, delayed, or incurred extra cost when the
Contractor discovers, or reasonably should discover, the condition or event giving rise to the Claim). A Claim not subject
to the procedures specified in Paragraph 4.2 may be asserted if, and only if, the Contractor gives a valid written notice of
intent to file the Claim within 3 working days of the date the Claim arises. A written notice of intent to file a claim will be
deemed valid if, and only if, it identifies the event or condition giving rise to the Claim and states its probable effect, i f
any, with respect to the Contractors entitlement to an adjustment of the Contract Sum and/or the Contract Time.
4.4 Assertion of Claims
Claims by Contractor shall be first submitted to County's Representative for decision. Notwithstanding the making of any
Claim or the existence of any dispute regarding any Claim, unless otherwise directed by County’s Representative,
Contractor shall not cause any delay, cessation, or termination in or of Contractor's performance of the Work, but shall
diligently proceed with performance of the Work in accordance with the Contract Documents. County will continue to
make payments in accordance with the Contract Documents. Contractor shall submit a Claim in writing, together with the
supporting data specified in Paragraph 4.3 to County’s Representative as soon as possible but not later than 7 days after
the date the claim arises under Paragraph 4.3.
4.5 Time Limits and Timely Notice of Contractor Claims
Contractor agrees to provide Owner and architect with written notice within seven (7) days of the occurrence of any event
giving rise to any claim for additional compensation or extension of time under this agreement, whether such claim is
based upon claims for changes, differing site conditions, adverse weather conditions, or any cause whatsoever. Contractor
waives any claims for additional compensation or time extension, if Contractor fails to timely notify the Owner and
architect in accordance with the terms and conditions of this clause. Contractor further acknowledges that any work which
the Contractor considers to be beyond the scope of original work and which the Contractor elects to perform, prior to notice
to Owner and architect and Owner’s written approval to proceed with additional work, shall be performed at the
Contractor’s peril and as a gratuity to the Owner. Contractor assumes all risk associated with such work, agrees to perform
such work at its own costs, and released and holds Owner harmless for any and all costs of such work performed prior to
notice and written approval of such additional work by Owner.
4.6 Decision of County’s Representative on Claims
County’s Representative decision on any or all claims shall be considered as final. Disputes shall be resolved through
litigation in a Court of competent jurisdiction in Beaufort, South Carolina.
ARTICLE 5
SUBCONTRACTORS
5.1 Award of Subcontracts to Other Contractors for Portions of the Work
Contractor shall submit to County, on its letterhead, prior to commencement of the Work, a list of all Subcontractors to be
used to perform the Work. If County objects to any Subcontractor, Contractor shall provide a substitute Subcontractor
acceptable to County with no adjustment of the Contract Sum. No substitution of Subcontractors shall be made without
County’s consent. All Subcontracts shall incorporate the Contract Documents by reference. Contractor hereby assigns to
118
Item 12.
59
County all of its interests in Subcontracts affecting the Work, effective only if County terminates the Contract for cause
and only for Subcontracts designated by County within 30 days after the date of termination. Nothing contained in the
Contract Documents shall create any contractual relationship between any Subcontractor and County, except when, and
only to the extent that, County elects to accept the assignment of the subcontract with such Subcontractor.
5.2 Separate Contractor Claims
Should Contractor cause damage to the work or property of any separate contractor at the site, or should any claim arising
out of Contractor’s performance of the Work or lack of same at the site be made by any separate contractor against
Contractor, County, Engineer, or any other person, Contractor shall promptly attempt to s ettle with such other contractor
by agreement, or to otherwise resolve the dispute by arbitration or at law. Contractor shall indemnify and hold County and
Engineer harmless from and against all claims, damages, losses and expenses (including, but not limi ted to, fees of
engineers, architects, attorneys and other professionals and court and arbitration costs) arising directly, indirectly or
consequentially out of any action, legal or equitable, brought by any separate contractor against County and Engineer to
the extent based on a claim arising out of Contractor’s performance or lack of same of the Work. Should a separate
contractor cause damage to the Work or property of Contractor or should the performance of Work or lack of same by any
separate contractor at the site give rise to any other claim, Contractor shall not institute any action, legal or equitable,
against County or Engineer or permit any action against any of them to be maintained and continued in its name or for its
benefit in any court or before any arbiter which seeks to impose liability on or to recover damages from County or Engineer
on account of any such damage or claim. If Contractor is delayed at any time in performing or furnishing Work by any
act or neglect of a separate contractor and County and Contractor are unable to agree as to the extent of any adjustment in
Contract Time attributable thereto, Contractor may make a claim for an extension of time in accordance with Article 4. An
Extension of the Contract Time shall be Contractor’s exclusive remedy with respect to County and Engineer for any delay,
disruption, interference or hindrance caused by any separate contractor. This paragraph does not prevent recovery from
Contractor or Engineer for activities that are their respective responsibilities.
ARTICLE 6
CONSTRUCTION BY COUNTY OR BY SEPARATE CONTRACTORS
6.1 County’s right to Perform Construction and to Award Separate Contracts
County may perform Work on the Project site, including Work which has been deleted from the Contract by Change Order,
with County’s own forces or with Separate Contractors. Contractor shall cooperate fully with County’s forces and Separate
Contractors at the Project site and coordinate the scheduling and performance of the Work with the scheduling and
performance of Work to be performed by County’s forces or Separate Contractors. Contractor shall give County’s forces
and Separate Contractors reasonable opportunity to deliver and store materials and equipment on the Project site.
6.2 Mutual Responsibility
A. Contractor shall afford County and Separate Contractors reasonable opportunity for introduction and storage of their
materials and equipment and performance of their activities. Contractor shall connect, schedule, and coordinate its
construction and operations with the construction and operations of County and Separate Contractors as required by the
Contract Documents.
B. If a portion of the Work is dependent upon the proper execution or results of other construction or operations by
County or Separate Contractors, Contractor shall inspect such other construction or operations before proceeding with that
portion of Work. Contractor shall promptly report to County’s Representative apparent discrepancies or defects which
render the other construction or operations unsuitable to receive the Work. Contractor shall not proceed with the portion
of Work affected until apparent discrepancies or defects have been corrected. Failure of Contractor to so report within a
reasonable time after discovering such discrepancies or defects shall constitute an acknowledgment that the other
construction or operations by County or Separate Contractor is suitable to receive the Work, except as to defects not then
reasonable discoverable.
6.3 County’s Right to Clean Up
If a dispute arises between Contractor and Separate Contractors as to the responsibility under their respective contracts for
maintaining the Project site and surrounding areas free from waste materials and rubbish, County may clean up and allocate
the cost between those firms it deems to be responsible
119
Item 12.
60
ARTICLE 7
CHANGES IN THE WORK
7.1 Changes
A. County may Order or authorize additions, deletions, and other changes in the Work by Change Order or Field Order
without invalidating the Contract and without notice to sureties. Absence of such notice shall not relieve such sureties of
any of their obligations to County. Upon receipt of any such document, Contractor shall promptly proceed with any changes
in the Work involved which will be performed under the applicable conditions of the Contract Documents (except as
otherwise specifically provided).
B. If County and Contractor are unable to agree on entitlement to, or on the amount or extent, if any, of an adjustment in
the Contract Price or Contract Times, or both that should be allowed as a result of a Work Change Directive, a Claim may
be made therefore as provided in paragraph 4.3
7.2 Definitions
A. A Change Order is a Contract Document which has been signed by both County and Contractor, and states their
agreement upon all of the following:
• A change in the Work, if any.
• The amount of an adjustment of the Contract Sum, if any.
• The amount of an adjustment of the Contract Time, if any.
B. A Directed Change Order may also be issued by the County without the Contractor’s signature, where County
determines that it is in County’s best interest to allow Contractor to receive such an adjustment of the Contract Sum or
Contract Time as County believes to be properly due Contractor, even though no agreement has been reached betwe en
County and Contractor.
C. A Field Order describes the scope or degree of a change in the Work which does not change the Contract Sum or
Contract Time and the change described within the Field Order is agreed upon by County and Contractor.
7.3 Change Order Procedures
A. County and Contractor shall execute appropriate Change Orders (or Written Amendments) recommended by the
County’s Representative or Architect/ Engineer covering changes in the Work which are:
• (i) ordered by the County (ii) required because of acceptance of defective work, or County’s correction of
defective Work, or (iii) agreed to by the parties;
• changes in the Contract Price or Contract Times which are agreed to by the County and the Contractor, including
any undisputed sums or amount of time for Work actually performed in accordance with a Work Change
Directive; and
• changes in the Contract Price or Contract Times which embody the substance of any written decision rendered
by the County’s Representative, or Architect/Engineer, provided that in lieu of executing any such Change Order,
an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and
applicable Laws and Regulations, but during any such appeal, Contractor shall carry on the Work and adhere to
the progress schedule.
B. Execution of a Change Order by the County and the Contractor shall be considered complete and final compensation.
It is expressly understood and agreed that the Contractor shall not be entitled to any additional compensation or time
associated with an executed Change Order.
7.4 Work Change Directive
The Work Change Directive is a written directive to Contractor issued on or after the Effective Date of the Agreement and
signed by County and recommended by Architect/Engineer ordering an addition, deletion, or revision in the Work, or
responding to differing or unforeseen subsurface or physical conditions under which the Work is to be performed or to
emergencies. A Work Change Directive will not change the Contract Price or the Contract Times but is evidence that the
parties expect that the change ordered or documented by a Work Change Directive will be incorporated in a subsequently
issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times.
Upon receipt of a Work Change Directive, the Contractor shall promptly proceed with the directed changes.
7.5 Unit Price Work
A. County has the right to increase or decrease the quantity of any Unit price item for which an estimated quantity is
stated in the Bid Form.
120
Item 12.
61
B. County’s Representative or Engineer will determine the actual quantities and classifications of Unit Price Work
performed by Contractor. County’s Representative will review with Contractor the Engineer’s preliminary determinations
on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or
otherwise). Engineer’s written decision thereon will be final and binding (except as modified by Engineer to reflect
changed factual conditions or more accurate data) upon County and Contractor, subject to the provisions of paragraph 4.3.
7.6 Waiver
A waiver of or failure by County or County’s Representative to enforce any requirement in this Article 7 will not constitute
a waiver of, and will not preclude the County or County’s Representative from enforcing, such requirements in connection
with any other adjustments of the Contract Sum. The Contractor understands that no oral approval, either express or
implied, of any adjustment of the Contract Sum by County or its agents shall be binding upon County unless and until such
approval is ratified by execution of a written Change Order.
ARTICLE 8
CONTRACT TIME
8.1 Commencement of the Work
The date of commencement of the Work shall be set forth in the Notice To Proceed, and in no case shall the Contractor
start Work later than 10 days within receipt of the Notice to Proceed. The date of commencement of the Work shall not be
postponed by the failure of Contractor, Subcontractors, or of persons or firms for whom Contractor is responsible to act.
8.2 Progress and Completion
Time limits stated in the Contract Documents are of the essence of the Contract. By signing the Agreement Contractor
represents to County that the Contract Time is reasonable for performing the Work and that Contractor is able to perform
the Work within the Contract Time. Contractor shall not; except by agreement or instruction of County in writing,
commence operations on the Project site or elsewhere prior to the effective date of insurance required by Article 11 to be
furnished by Contractor. The dates of commencement and completion of the Work shall not be changed by the effective
date of such insurance. Contractor shall proceed expeditiously with adequate forces and shall achieve full Completion of
the Work within the Contract Time. If County’s Representative determines and notifies Contractor that Contractor’s
progress is such that Contractor will not achieve full Completion of the Work within the Contract Time, Contractor shall
immediately and at no additional cost to, County take all measures necessary, including working such overtime, additional
shifts, Sundays, or holidays as may be required to ensure that the entire Project is completed within the Contract Time.
Upon receipt of such notice from County’s representative, Contractor shall immediately notify County’s Representative
of all measures to be taken to ensure full Completion of the Work within the Contract Time. Contractor shall reimburse
County for any extra costs or expenses, including the reasonable value of any services provided by County’s employees,
incurred by County as the result of such measures.
8.3 Delay
Except and only to the extent provided otherwise in Articles 7 and 8, by signing the Agreement, Contractor agrees:
• to bear the risk of delays to completion of the Work; and
• that Contractor’s bid for the Contract was made with full knowledge of this risk.
In agreeing to bear the risk of delays to completion of the Work, Contractor understands that, except and only to the extent
provided otherwise in Articles 7 and 8, the occurrence of events that delay the Work shall not excuse Contractor from its
obligation to achieve full completion of the Work within the Contract Time, and shall not entitle the Contractor to an
adjustment of the Contract Sum.
8.4 Adjustment of Contract Time
The Contract Times may only be changed by a Change Order or by a Written Amendment. Any Claim for an adjustment
in the Contract Times shall be based on written notice submitted by the party making the claim to the County’s
Representative and the other party to the Contract in accordance with the provisions of paragraph 4.3. Any adjustment of
the Contract Times covered by a Change Order or of any Claim for an adjustment in the Contract Times will be determined
in accordance with the provisions of this Article.
121
Item 12.
62
8.5 Weather Delays
Weather delays are generally referred to as “rain days,” and shall apply to days when the Work cannot be undertaken due
to adverse weather conditions. Time for hot, cold, and/or windy conditions have been allowed for in the allocated date of
completion.
Rain delays will only be considered when the number of days in any month in which rainfall is 0.1 inch or greater, as
recorded by the National Oceanic and Atmospheric Administration (NOAA) gauging station closest to the job site, exceeds
the rolling 20- year average number of days for that month and for that location. NOAA data can be obtained from the
historic climate information for the Charleston forecast office on their website. In lieu of using the NOAA gauge data, the
contractor may install a County approved rain gauge on the project site. The gauge reading shall be reported daily on a log
and presented to the County with the monthly invoice.
If in the opinion of the Contractor, adverse weather causes unsuitable conditions that prevent the contractor from
proceeding with the Work at any time during the term of this Contract, the Contractor shall submit written notification to
the County’s Representative within twenty-four (24) hours of the onset of the said condition
8.6 Delays Beyond Contractor’s Control
Where Contractor is prevented from completing any part of the Work within the Contract Times due to delay beyond the
control of Contractor, the Contract Times will be extended in an amount equal to the time lost due to such delay if a Claim
is made therefore as provided in paragraph 4.3. Delays beyond the control of Contractor shall include, but not be limited
to, acts or neglect by County. acts or neg1ect of utility owners or other contractors performing Work as contemplated by
Article 5 fires, floods, epidemics, abnormal weather conditions, or acts of God.
8.7 Delays Within Contractor’s Control
The Contract Times will not be extended due to delays within the control of Contractor. Delays attributable to and within
the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor.
8.8 Delays Beyond County’s and Contractor’s Control
Where Contractor is prevented from completing any part of the Work within the Contract Times due to delay beyond the
control of both County and Contractor an extension of the Contract Times in an amount equal to the time lost due to such
delay shall be Contractor’s sole and exclusive remedy for such delay.
8.9 Liquidated Damages
If the Contractor fails to substantially complete the Work by the specified completion date, the Contractor shall be liable
for liquidated damages for each calendar date past the contract specified completion date. The date of substantial
completion shall be determined by the County Engineer and his decision shall be final. The daily liquidated damages rate
shall be determined from the Schedule of Liquidated Damages provided within the South Carolina Department of
transportation Standard Specifications for Highway Construction, Edition of 2007 unless otherwise specified in the Bid
Documents.
8.10 Waiver
A. In no event shall County , County’s Representative, or County’s Architect/Engineer be liable to Contractor, any
Subcontractor, and Supplier, or any other person or organization, or to any surety for or employee or agent of any of them,
for damages arising out of or resulting from:
• delays caused by or within the control of Contractor; or
• delays beyond the control of both County and Contractor including but not limited to fires, floods, epidemics,
abnormal weather conditions, acts of God, or acts or neglect by utility owners or other contractors performing
other work contemplated by Article 5.
B. Nothing in paragraph 8.9 bars a change in Contract Price pursuant to this Article 4.3 to compensate Contractor due to
delay, interference, or disruption directly attributable to actions or inactions of County or anyone for whom County is
responsible.
122
Item 12.
63
ARTICLE 9
PAYMENTS AND COMPLETION
9.1 Unit Price Work
A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract
Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately
identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. The estimated
quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and
determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work
performed by Contractor will be made by County’s Representative or Engineer subject to the provisions of paragraph 9.2.
B. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor’s
overhead and profit for each separately identified item.
C. County or Contractor may make a Claim for an adjustment in the Contract Price in accordance with paragraph 4.3 if:
• the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the
estimated quantity of such item indicated in the Agreement; and
• there is no corresponding adjustment with respect any other item of Work; and
• if Contractor believes that Contractor is entitled to an increase in Contract Price as a result of having incurred
additional expense or Contractor believes that Contractor is entitled to a decrease in Contract Price and the parties
are unable to agree as to the amount of any such increase or decrease.
9.2 Schedule of Values
Contractor shall provide a preliminary schedule of values for all of the Work which includes quantities and prices of items,
when added together, equal the Contract Price and subdivides the Work into component parts in sufficient detail to serve
as the basis for progress payments during performance of the Work. County’s Representative will determine the actual
quantities and classifications of Unit Price Work performed by Contractor. County’s Representative will review with
Contractor the County Representative’s preliminary determinations on such matters before rendering a written decision
thereon (by recommendation of an Application for Payment or otherwise). County Representative’s written decision
thereon will be final and binding (except as modified by County’s Representative to reflect changed factual conditions or
more accurate data) upon County and Contractor, subject to the provisions of paragraph 4.3.
9.3 Progress Payments
County agrees to pay monthly to Contractor, subject to paragraph 9.5, an amount equal to 90% of the sum of the following:
• Cost of the Work in permanent place as of the end of the preceding month.
• Plus costs of materials stored on site but not yet incorporated in the Work.
• Less amounts previously paid.
9.4 Application for Payment
On or before such date of the month as is established by the County’s Representative, Contractor shall submit to County's
Representative monthly applications for payment, on a form as provided by the County, together with such supporting
data, as County requires. Adjusted progress schedules shall be submitted with Applications for payment, and shall be
required supporting documentation for the Application for Payment. For each Work item and monthly period, the actual
percentages shall be tabulated for Work completed as of the date of the Application for Payment and estimated percentages
shall be tabulated for remaining Work and months, if any. Percentages for Unit Price Work shall be calculated based upon
the quantities given in the Bid Form, so that upon completion of such Work, or prior thereto, the total of the tabulated
percentages for a work item may be greater or less than 100. County’s Representative will review the application for
payment and submit a Certificate for Payment to County. County will pay to Contractor 90% of the cost of the Work in
permanent place and approved by County, less amounts previously paid, within 20 days after County’s Representative's
receipt of the Application For Payment and all required supporting data. The 10% retained by County will be paid to
Contractor in the final payment.
9.5 Certificate for Payment
A. If Contractor has made application is accordance with paragraph 9.4, County’s Representative shall, not later than 5
working days after the date of receipt of the Application for Payment, issue to County, with a copy to Contractor, a
Certificate for Payment for such amount as County’s Representative determines to be properly due.
123
Item 12.
64
B. Approval of any part of an Application For Payment may be withheld, a Certificate For Payment may be withheld,
and all or part of a previous Certificate For Payment may be nullified and that amount withheld from a current Certificate
For Payment on account of any of the following:
• Defective Work not remedied.
• Third-party claims against Contractor or County arising from the acts or omissions of Contractor or
Subcontractors.
• Stop notices.
• Failure of Contractor to make timely payments due Subcontractors for material or labor.
• A reasonable doubt that the Work can be completed for the balance of the Contract Sum then unpaid.
• Damage to County or Separate Contractor for which Contractor is responsible.
• Reasonable evidence that the Work will not be completed within the Contract Time; and that the unpaid balance
of the Contract Sum would not be adequate to cover County’s damages for the anticipated delay.
• Failure of Contractor to maintain and update as-built documents.
• Failure of Contractor to submit schedules or their updates as required by the Contract Documents
• Performance of Work by Contractor without properly processed shop drawings.
• Liquidated damages assessed in accordance with Article8 of the Agreement.
• Any other failure of Contractor to perform its obligations under the Contract Documents.
9.6 Retention
County shall deduct 10% from each Contractor payment as retainage. Retainage may be reduced at the County’s discretion,
to 5% upon 50% completion of the Work and/or upon recommendation of the Architect/Engineer. All remaining retainage
to be paid upon satisfactory completion of all Work, as required by the Cont ract Documents.
9.7 Beneficial Occupation
County reserves the right, at its option and convenience, to make use of or otherwise occupy all or any part of the Work
(Beneficial Occupancy) prior to completion of the Work and upon 10 days’ notice to Contractor. Beneficial Occupancy
shall be subject to the following conditions:
A. County’s Representative will make an inspection of the portion of the Project to be beneficially occupied and prepare
a list of items to be completed or corrected prior to completion of the Contract.
Prior to Beneficial Occupancy, County will issue a certificate of beneficial occupancy on County’s form.
• Beneficial Occupancy by County shall not be construed by Contractor as an acceptance by County of that portion
of the Work which is to be occupied.
• Beneficial Occupancy by County shall not constitute s waiver of existing claims of County or Contract against
each other.
• Contractor shall provide, in the areas beneficially occupied and on a 24 hour and 7 day week basis as required,
utility services, heating, and cooling for systems which are in operable condition at the time of Beneficial
Occupancy. All responsibility for the operation and maintenance of equipment shall remain with Contractor while
the equipment is so operated. Contractor shall submit to County an itemized list of each piece of equipment so
operated with the date operation commences.
• The Warrantee Periods, as defined in paragraph 12.3, will commence upon the first date of actual occupancy or
use of portions of the Work actually occupied and equipment or systems fully utilized.
• County shall pay all normal operating and maintenance costs resulting from its use of equipment in areas
beneficially occupied.
• County shall pay all utility costs which arise out of the Beneficial Occupancy.
• Contractor shall not be responsible for providing security in areas beneficially occupied.
• County shall use its best efforts to prevent its Beneficial Occupancy from interfering with the conduct of
Contractor’s remaining Work..
• Contractor shall not be required to repair damage caused by County in its Beneficial Occupancy.
• Except as provided in this Article, there shall be no added cost to County due to Beneficial Occupancy.
• Contractor shall continue to maintain all insurance required by the Contract in full force and effect.
9.8 Substantial Completion
A. “Substantial Completion” means the stage in progress of the Work, as determined by the County’s Representative,
when the Work is complete and in accordance with the Contract Documents except only for completion of minor items
which do not impair County’s ability to occupy and fully utilize the Work for its intended purpose.
124
Item 12.
65
B. When Contractor gives notice to County’s Representative that the Work is substantially complete, unless County’s
representative determines that the Work is not sufficiently complete to warrant an inspection to determine Substantial
Completion, County’s Representative will inspect the Work, and prepare and give to Contractor a comprehensive list of
items to be completed or corrected before establishing Substantial Completion. Contractor shall proceed promptly to
complete and correct items on the list. Failure to include an item on such list does not alter the responsibility of the
Contractor to complete all Work in accordance with the Contract Documents. County’s Representative will make an
inspection to determine whether the Work is substantially complete. If County Representative’s inspection discloses any
item, whether or not included on the list, which must be completed or corrected before Substantial Completion, Contractor
shall, before issuance of the Certificate of Substantial Completion, complete or correct such item. Contractor shall then
submit a request for another inspection by County’s Representative to determine Substantial Completion. Costs for
additional inspection by County’s Representative shall be deducted from any monies due and payable to C ontractor.
Neither tentative nor definitive certificates will be issued. However, the procedures set forth in the above paragraph may
be used as a prelude to final acceptance.
C. When County’s Representative determines that the Work is Substantially Complete, County’s Representative will
prepare a Certificate of Substantial Completion in County’s format , which, when signed by County, shall establish the
date of Substantial Completion and the responsibilities of the County and Contractor for security, maintenance, utilities,
insurance , and damage to the Work. Unless otherwise provided in the Certificate of Substantial Completion, the Warrantee
Period for the Work covered by the Certificate of Substantial Completion shall commence on the date of Final Payment
for the Work. Substantial Completion shall not commence the Warrantee Period for any equipment or systems that:
• Are not fully operational (equipment or systems shall not be considered fully operational if they are intended to
provide service to any portion of a building which the County has neither Beneficially Occupied nor accepted as
Substantially Complete; or
• Are not accepted by the County.
The Warrantee Period for systems which become fully operational and accepted subsequent to Substantial Completion
will begin on the date of their acceptance by the County.
9.9 Final Completion and Payment
A. Upon receipt of notice from the Contractor that the Work is ready for final inspection, County’s Representative will
make such inspection. Final Completion shall be when County’s Representative determines that the Work is fully
completed and in accordance with the Contract Documents. County will file a Notice of Completion within days after
Final Completion. After receipt of the final Application For Payment, if County’s Representative determines that Final
Completion has occurred, County’s Representative will issue the final Certificate For Payment.
B. Neither final payment nor any retention shall become due until Contractor submits the following items to County’s
Representative:
• The final Application For Payment and all submittals required in accordance with 9.4.
• All guarantees and warrantees procured by Contractor from Subcontractors, all operating manuals for equipment
installed in the project, as-built documents, and all other submittals required by the Contract Documents.
The final payment shall be made, subject to the satisfaction of all other conditions to final payment, within 35 days after
the filing of the Notice of Completion.
C. Acceptance of final payment by Contractor shall constitute a waiver of all claims, except those previously made in
writing and identified by Contractor as unsettled at the time of the final Application for Payment.
ARTICLE 10
PROTECTION OF PERSONS AND PROPERTY
10.1 Safety Precautions and Programs
Contractor shall be solely responsible for initiating, maintaining, and supervising all safety precautions and programs in
connection with the performance of the Contract.
10.2 Safety of Persons and Property
Contractor shall take adequate precautions for safety of and shall provide adequate protection to prevent damage, injury,
or loss to employees involved in the Work and other persons who may be affected thereby; the Work in place and materials
125
Item 12.
66
and equipment to be incorporated therein, whether in storage on or off the Project site, under care, custody, or control of
Contractor or Subcontractors; and, other property at the Project site and adjoining property. Contractor shall erect and
maintain until the acceptance of the Work, as required by existing conditions and performance of the Work , adequate
safeguards for safety and protection, including providing adequate lighting and ventilation , posting danger signs and other
warnings against hazards, promulgating safety regulations, and notifying owners and users of adjacent sites and utilities.
When use or storage of explosives, other hazardous materials, equipment, or unusual methods are necessary for execution
of the Work Contractor shall exercise the utmost care and carry on such activities only under the supervision of properly
qualified personnel. Contractor shall designate a responsible member of Contractor’s organization at the Project site whose
duty shall be prevention of accidents. That person shall be the Superintendent, unless otherwise designated by Contractor
in writing to County and County’s Representative. Contractor shall not load or permit any part of the Work or the Project
site to be loaded so as to endanger the safety of persons or property.
10.3 Emergencies
In an emergency affecting the safety of persons or property, Contractor shall act to prevent or minimize injury, damage,
or loss. Contractor shall promptly notify County’s Representative, which notice may be oral followed by written
confirmation, or the occurrence of such an emergency and Contractor’s action.
ARTICLE 11
INSURANCE AND BONDS
11.1 Contractors Insurance
A. Contractor shall purchase and maintain until final payment property insurance upon the Work at the site. This
insurance shall include the interest of the County, Contractor, Subcontractors, Engineer and Engineer’s Consultants in the
Work (all of whom shall be listed as insureds or additional insured parties), shall insure against the perils of fire and
extended coverage, shall include “at risk” insurance for physical loss and damages including theft, vandalism, and
malicious mischief, and shall include damages, losses and expenses arising out of or resulting from any insured loss
incurred in the repair or replacement of any insured property (included but not limited to fees and charges of engineers,
architects, attorneys and other professionals). All of the policies of insurance (and certificates or other evidence of
insurance) required to be purchased by the Contractor will contain a provision that the coverage provided will not be
materially changed, cancelled, or renewal refused until at least thirty (30) days prior writte n notice has been given to the
County and Contractor and to each other party to whom a certificate of insurance has been issued and will contain waiver
provisions in accordance with paragraph 11.3.
B. Contractor shall purchase and maintain insurance coverage as required within the Schedule of Insurance Requirements
of Exhibit GR-A, attached hereto and made part thereof.
C. If required in the Schedule of Insurance Requirements of Exhibit GR-A in Part II of the General Requirements of the
Specifications, attached hereto and made a part thereof, Contractor shall purchase and maintain such boiler and machinery
insurance or additional property insurance as may be required by the Supplementary Conditions or Laws or Regulations
which will include the interests of the County, Contractor, Subcontractors, Engineer, Engineer’s Consultants, and any other
individuals or entities identifie d in the Supplemental Conditions, each of whom is deemed to have an insurable interest
and shall be listed as an insured or additional insured.
D. If the Work requires entry on any railroad right-or-way, insurance coverage and amount of coverage shall be provided
in accordance with the requirements of the railroad.
11.2 Insurance Certificates
Before any Work at the site is authorized, Contractor shall deliver to the County Engineer, in triplicate, certificates as
evidence of insurance which Contractor is required to purchase and maintain in accordance with the Schedule of Insurance
Requirements. The certificates delivered by Contractor shall contain for each insurance policy required the following
information: policy number, effective date, names and addresses of insureds, type of coverage, limits of liability, location
of operations to which insurance applies, and expiration date. In addition, the certificates shall refer to these Contract
Documents and state that the policy or policies provide the coverage and the amount of coverage required by the Contract
Documents. Further, the certificates shall state that thirty days prior written notice shall be given to County of cancellation
or material change in the policy. If County has any objection to the coverage afforded by or other provisions of the
insurance required to be purchased and maintained by Contractor on the basis of its not complying with the Contract
Documents, County shall notify Contractor in writing thereof. Contractor shall provide such additional information in
respect of information as County may reasonably request, before any Work at the Site is authorized.
126
Item 12.
67
11.3 Waiver of Rights
A. County and Contractor intend that all policies purchased in accordance with paragraph 11.1 will protect County,
Contractor, Subcontractors, Engineer, Engineer’s Consultants, and all other individuals or entities identified in the
Supplementary Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees,
agents, and other consultants and subcontractors of each and any of them) in such policies and will provide primary
coverage for all losses and damages caused by the perils or causes of loss covered thereby. All such policies shall contain
provisions to the effect that in the event of payment of any loss or damage the insurers will have no rights of recovery
against any of the insureds or additional insureds thereunder. County and Contractor waive all rights against each other
and their respective officers, directors, partners, employees, agents, and other consultants and subcontractors of each and
any of them for all losses and damages caused by, arising out of or resulting from any of the perils or causes of loss covered
by such policies and any other property insurance applicable to the Work; and, in addition, waive all such rights against
Subcontractors, Engineer, Engineer’s Consultants, and all other indivi duals or entities identified in the Supplementary
Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees, agents, and other
consultants and subcontractors of each and any of them) under such policies for losses and damages so caused. None of
the above waivers shall extend to the rights that any party making such waiver may have to the proceeds of insurance held
by County as trustee or otherwise payable under any policy so issued.
B. County waives all rights against Contractor, Subcontractor, Engineer, Engineer’s Consultants, and the officers,
directors, partners, employees, agents, and other consultants and subcontractors of each and of them for:
• loss due to business interruption, loss of use, or other consequential loss extending beyond direct physical loss or
damage to County’s property or the Work caused by, arising out of,, or resulting from fire or other peril whether
or not insured by County; and
• loss or damage to the c