Special Called Public Facilities and Safety Committee
Beaufort County, SC
Council Chambers, Administration Building Beaufort County Government Robert Smalls
Complex 100 Ribaut Road, Beaufort
Tuesday, June 04, 2024
10:00 AM
AGENDA
COMMITTEE MEMBERS:
BLOGAN CUNNINGHAM, CHAIRMAN DAVID P. BARTHOLOMEW, VICE-CHAIRMAN
THOMAS REITZ PAULA BROWN
ANNA MARIA TABERNIK JOSEPH F. PASSIMENT, EX-OFFICIO
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. PUBLIC NOTIFICATION OF THIS MEETING HAS BEEN PUBLISHED, POSTED, AND DISTRIBUTED IN
COMPLIANCE WITH THE SOUTH CAROLINA FREEDOM OF INFORMATION ACT
4. APPROVAL OF AGENDA
AGENDA ITEMS
5. DISCUSSION OF POSSIBLE AMENDMENTS TO THE PROPOSED 2024 TRANSPORTATION SALES AND USE
TAX ORDINANCE AND REFERENDUM.
6. ADJOURNMENT
EXECUTIVE SESSION
TO WATCH COMMITTEE OR COUNTY COUNCIL MEETINGS OR FOR A COMPLETE LIST OF AGENDAS AND
BACKUP PACKAGES, PLEASE VISIT:
https://beaufortcountysc.gov/council/council-committee-meetings/index.html
1
Projects
Current 15-yr
($1.625B)
Option 1: 15-yr
($1.625B)
Option 2: 12-yr
($1.2B)
Option 3: 10-yr
($950M)
Option 4: 8-yr
($725M)
US 278 60 190 190 190 190
Lady's Island 40 40 40 40 40
24 Pathways 30
Greenbelts 85 150 110 95 75
Mass Transit 100 100 90 80 45
The Triangle 100 245 245 245 245
Ribaut Rd 75 75 75 75 75
SC 46 20 20 20 20
HHI Projects 60 50 30
Bluffton Projects 60 50 30
North of Broad 60 50 30
Safety 250 225 150 55
Dirt Road 180 90 50 50 25
Resurfacing 90 50 50
Pathways 180 150 90 50
Resilency/Evacuation 90 50
Technology & Access Rds 90 50
Future Projects 175
Total 1625 1625 1200 950 725
2
Item 5.
3
Item 5.
Beaufort/Port Royal Concerns
4
Item 5.
Hilton Head Island Concerns
5
Item 5.
Bluffton Concerns
6
Item 5.
St. Helena Concerns
7
Item 5.
Northern Beaufort County Concerns
8
Item 5.
What’s Included Current
15-yr Program to Collect $1.625B
($60M)
($60M)
($60M)
($250M)
($180M)
($180M)
($90M)
($90M)
($175M)
($60M)
($40M)
($85M)
($100M)
($100M)
($75M)
($20M)
9
Item 5.
What’s Included Option 1
15-yr Program to Collect $1.625B
($50M)
(Not incl. 5B) ($50M)
($50M)
($225M)
($90M)
($90M)
($150M)
($50M)
($50M)
($190M)
($40M)
($150M)
($100M)
($245M)
($75M)
($20M)
10
Item 5.
What’s Included Option 2
12-yr Program to Collect $1.2B
($30M)
(Not incl. 5B) ($30M)
($30M)
($150M)
($50M)
($50M)
($90M)
($190M)
($40M)
($110M)
($90M)
($245M)
($75M)
($20M)
11
Item 5.
What’s Included Option 3
10-yr Program to Collect $950M
($55M)
($50M)
($50M)
($50M)
($190M)
($40M)
($95M)
($80M)
($245M)
($75M)
($20M)
12
Item 5.
What’s Included Option 4
8-yr Program to Collect $725M
($25M)
($190M)
($40M)
($30M)
($75M)
($45M)
($245M)
($75M)
13
Item 5.
Exhibit A
MEMORANDUM
To: Chairman and Members, Beaufort County Council
From: Dean Moss, Chairman, Sales Tax Advisory Committee
Copy to: County Administrator and Members of 2023 Sales Tax Advisory
Committee
Subject: Sales Tax Advisory Committee Report and Recommendations
Date: December 11, 2023
1. Introduction
The purpose of this memo is to transmit to the Beaufort County Council the
recommendations and observations of the Council appointed Sales Tax
Advisory Committee (STAC). These recommendations represent the
unanimous position of the 6 members of the Committee.
2. Summary General Recommendations
The Committee recommends that Council prepare a referendum question to
be placed upon the ballot in November 2024, which will ask the electorate to
approve a one percent (1%) additional sales tax in Beaufort County, beginning
in the following year and extending for fifteen years. The proceeds from this
tax would be expended by the County for a series of critical transportation and
mobility projects and programs vital to the health and safety of the residents
and visitors. Further, the Committee recommends that a standing Citizen’s
Oversight Committee be appointed to assist the County Council and staff in
the prioritization and implementation of the projects and activities to be
funded by the referendum.
3. Council’s Charge to the Committee
County Council created the STAC through a resolution adopted on 12 June
2023. The charge to the Committee reads as follows:
14
Item 5.
2
‘ The Committee will, by a date to be set by Council in the future, provide
Council with information that identifies the need and, where required the
specific projects for the various referenda questions.”
4. Committee Process
The Committee consisted of six (6) members, one representing the two
municipalities north of the Broad River, one representing the Town of Hilton
Head, one representing the Town of Bluffton, two representing the north
county unincorporated area, and one representing the south county
unincorporated area. Five of the six members had been members of the
Transportation Tax Committee established in early 2022 and were familiar
with the technologies and concepts being discussed. The Committee met eight
times, on Thursday afternoons from 5:30 to between 7:00 and 7:30. At the
meeting on November 30, the Committee reached a general consensus, and at
the meeting on December 7, formally voted unanimously to approve the
projects, amounts, and recommendations that are contained in this memo.
5. Sales Tax Alternatives Considered
The Committee was initially presented with three separate sales tax options
based on three separate State statutes: one for Transportation, one for Capital
Projects, and one for Education. Two meetings evaluated and discussed these
and the opportunities each presented. We watched the 2023 Education
Referendum carefully with the thought that, should it not pass, a sales tax
might be needed to raise the funds required for the School District. It did pass,
and we turned our attention to the Transportation Tax and the Capital Projects
Tax. Both offer significant opportunities since a very substantial portion of the
taxes collected for either one would be paid by visitors to the County and
residents of adjacent counties. After analysis and considerable discussion, we
settled on the Transportation Tax and our recommendations for that tax are
contained herein. I would note that we recommend that Council consider the
addition of a Capital Projects 1% tax in the future.
6. Role of the Staff
Staff involved in this project consisted of Assistant County Administrator of
Infrastructure Jared Fralix and Executive Assistant Carol Puryear. Given the
15
Item 5.
3
complex nature of this process there was a lot for the Committee members to
learn and staff provided many documents and plans that had been completed
by the State of SC and other Counties. Staff provided the Committee with a
suggested list of projects, transportation program categories and amounts.
There were many questions at every meeting, and they were clearly and
patiently answered. In sum, the staff support to the STAC was outstanding.
7. Concepts behind the Recommendations
The Committee is recommending that the referendum contain two types of
project expenditures.
a. Big Projects - $650,000,000
These represent the traditional approach to referendum questions. As in
the 2018 referendum, specific projects are enumerated with an allocation
of money specified. An example might be “Highway 170 Improvements –
$80 million.” A short description of the project is included. As described
below, the Committee recommends that eight of these projects be included
in the referendum. They are countywide and address problems both on
Federally designated highways (278, 46, 170, 21) and on State, County, and
local roads, and streets. $300 million is recommended for projects south of
the Broad River, and $175 million is recommended for projects north of the
Broad River. $175 million is recommended for future “big projects”. It is
important to note that none of these projects have been fully designed or
bid, and the amounts assigned to them do not represent project budgets.
b. Project Programs $975,000,000
This category encompasses a large variety of projects which, because they
are small (pave a dirt road), or because they may emerge in the future, are
not specifically defined. These are projects that are, and will be, undeniably
required, but which cannot yet be defined and may cost only a fraction of a
“Big Project.” They would address needs that will emerge all over the
County; in response, for example, to coastal flooding, new developments in
rural areas, or the need to resurface existing streets. Spent correctly, these
funds will benefit residents and businesses all over the County. The
Committee recommends putting approximately sixty percent ($975 million)
of the total expected revenue into these categories of projects, as
described below.
16
Item 5.
4
8. Recommendations
a. Amount and Duration of Tax
We recommend that the sales tax be applied at 1% (one penny on the dollar) for a
period of fifteen years. We assumed a moderate to high growth rate. Based upon
this projection, the tax should raise approximately $1.625 billion over 15 years.
We believe that this amount will enable us to plan, develop, and implement
appropriate solutions to meet the current needs caused by an overwhelmed and
aging infrastructure system and to accomplish the improvements required to
address future demands. In addition, this money can be multiplied several times
over by aggressive pursuit of matching federal and state funds and the
development of coordinated projects with Jasper County.
b. Big Projects and Amounts
i. The Triangle - $100,000,000
Capacity and safety improvements on the Beaufort County section
of the triangle made by Hwy 170, Hwy 278, and Argent Blvd. This
project will be developed jointly with Jasper County. Traffic counts
on these roadways have exploded with the development of
residential and commercial development along all three corridors.
ii. Ribaut Road Improvements -$75,000,000
Implementation of the “Reimagine Ribaut Road” Project
developed by the County, the City of Beaufort, and the Town of
Port Royal to improve safety, interconnectivity, capacity, and
attractiveness along the Ribaut Road Corridor between Boundary
Street and the Russell Bell Bridge.
iii. Hwy 46 Improvements - $20,000,000
Capacity and safety improvements along SC 46 from SC 170 to
Jasper County. Additional safety improvements (i.e.- turn lanes at
intersections) along SC 46 from SC 170 to Buckwalter Parkway. All
planned improvements would be designed so as to preserve the
South Carolina Scenic Byway designation.
iv. Lady’s Island Corridor Improvements -$40,000,000
Lady’s Island Corridor Traffic Improvements from the Woods
Memorial Bridge to Chowan Creek. These funds would
supplement the monies approved in the 2018 referendum.
17
Item 5.
5
v. Bluffton Municipal Projects - $60,000,000
Implementation of any or all Bluffton projects listed as priorities
by the Bluffton Town Council.
vi. Hilton Head Island Municipal Projects - $60,000,000
Intersection improvements to include Sea Pines Circle and
adjacent corridors for the safety of motorists, bicyclists and
pedestrians.
vii. North of the Broad Transportation System Improvements -
$60,000,000
Intersection improvements, pathways, flood prevention on access
roads such as, Warsaw Island Road, and other projects in both
incorporated and unincorporated areas developed in coordination
with the City of Beaufort and the Town of Port Royal.
viii. Hwy 278 Project Enhancements -$60,000,000
Additional funding to support the US 278 Corridor Improvement
Project.
ix. Future Projects - $175,000,000
The County and its neighbors will continue to grow into the
future, and work must be continued to plan for the transportation
improvements going forward. As an example, and while not
specifically listed here, a third bridge between Port Royal Island
and Lady’s Island has been discussed for decades and given the
growth on Lady’s Island, may become necessary before too long.
c. Project Programs and Amounts
i. Mass Transit – $100,000,000
Funding multimodal transportation planning and implementation,
to include marine transport and commercial airport
improvements for a more robust and equitable public
transportation system.
ii. Safety and Traffic Flow - $250,000,000
Safety improvements along roadways and intersections to include
pedestrian accommodations.
iii. Emergency Evacuation and Resiliency - $90,000,000
18
Item 5.
6
Improvements to transportation infrastructure to address
flooding, rising sea levels, stormwater, and drainage.
iv. Pavement Resurfacing and Preservation – $180,000,000
Road resurfacing and preservation of ALL roadways (State,
County, and municipal-owned) throughout the County. The goal is
to improve the overall pavement condition of roads across the
County. This includes paving county and municipally owned dirt
roads throughout the county.
v. Pathways - $180,000,000
Design, right of way acquisition, and construction of bike and
pedestrian accommodations throughout the County in
accordance with the Beaufort County Connects Bicycle and
Pedestrian Plan 2021. We recommend that priority be given to
pathways already approved by the voters in the 2018 referendum.
vi. Transportation Technology/Access Roads - $90,000,000
Planning, design, right-of-way acquisition, and construction of
access roads for better interconnectivity. Implementation of
transportation technologies to support enhancements to capacity
and safety of the transportation system.
vii. Greenbelts (Long-term Demand Reduction) - $85,000,000
Acquisition of property to reduce new lots and thereby establish a
balance between environmental protection and development
growth. Note: the term “Greenbelt” is used in the enabling
legislation as an eligible category of expenditure.
9. Implementation Recommendations
a. Citizen’s Oversight Committee (“Committee”)
i. County Council, with other stakeholders, should create a citizen’s
oversight committee similar to the BCSD’s successful Citizen’s
Oversight Committee to oversee and prioritize projects for the
entire length of the program. It should meet bi-monthly or
quarterly. Its membership of seven members should reflect the
interests of all citizens of the County.
19
Item 5.
7
ii. The Committee should make a call each year for projects from all
stakeholders (County, municipalities, LATS/COG) for general
projects.
iii. The Committee should prioritize all central programs, such as:
1. Safety: intersection Improvements, turn lanes, rural road
improvements. Specifics to be developed.
2. Dirt Road Paving: update the existing 5-year plan to include
municipal dirt roads.
3. Resilience: priorities should be based on susceptibility to
flooding and population or critical functions the road
serves.
4. Resurfacing: program to look at improving any and all
roads (DOT, County, Municipal) specifics to be developed.
5. Pathways: use approved county-wide pedestrian and bike
master plan as a guide. Priorities to projects already
approved by voters.
6. Transportation Technologies/Access Roads: focus on
access and connecting roads, smart signals, and other
advanced transportation technologies.
b. Issue Revenue Bonds
Big projects should be bonded for immediate work.
c. Long Term Demand Reduction
Utilize the new Greenspace Board for priority setting of expenditures
related to land or development rights acquisition.
d. Mass Transit
Because no central plan currently exists for a comprehensive mass
transit program, this should be the first priority. Utilize the existing
transit authority as the lead agency for this effort supported by an
advisory committee.
20
Item 5.
21
Item 5.
Source: Beaufort County website. First collected Nov 14, 2026.