LOGISTICS CENTER
PLANNED DEVELOPMENT DISTRICT
DOCUMENT
PREPARED FOR:
THE SILVERMAN GROUP
SUBMITTED TO:
JASPER COUNTY
SOUTH CAROLINA
SUBMITTED 11.23.2021
Updated 1.14.2022
PREPARED BY:
R. STEWART DESIGNS, LLC
Page2
Page2
APPLICANT AND CONSULTING TEAM
Applicant
The Silverman Group
Holden Sabato, Development Coordinator
195 Morristown Road
Basking Ridge, NJ 07920
www.silvermangroup.net
holdensabato@silvermangroup.net
Office: 973-765-0100 x4083
Cell: 862-222-5899
Property Owner
Eagle Associates of Niagara Frontier, Inc. a NY Corporation
4155 Walden Avenue, Lancaster, NY 14086.
Jonathan Taber, Assistant VP
jtaber@taberpatrick.com
Legal Counsel
Burnet R. Maybank, III
BMaybank@nexsenpruet.com
843-960-3024
Project Liaison
Randolph Stewart, R. Stewart Designs, LLC
12 Johnston Way Penthouse PO Box 1813 Bluffton, SC 29910
randolph@rstewartdesigns.com 843.816.4005
Page3
Page3
Civil Engineering
Howard Ray, HRC Engineering
655 Church Street Douglasville, Ga. 30134
hray@hrcengineering.com 770.942.0152
Cultural and Historical Resources
Wetland/Environmental Consultation
Atlas Environmental
Jennifer L. Robertson
JRobertson@Atlasenvi.com
338 S. Sharon Amity Road #411
Charlotte, NC 28211 704.512.1206
Traffic Engineering
Bihl Engineering
Jennifer Bihl
306 Meeting St. Suite 300
Charleston, SC 29401
admin@bihl-engineering.com
843.637.9187
Surveying
Ashley Land Surveying, Inc.
PO Box 1302 Summerville, SC 29484
plawson@ashleyes.com 843.871.9538
Page4
Page4
TABLE OF CONTENTS
SECTION I – INTRODUCTION AND NARRATIVE
95 Logistics Center
A. The Property and Project Narrative 6
B. Planned Development District and Development Agreement Process 9
C. Conceptual Master Plan 9
D. Environmental Protection 10
E. Cultural and Historical Resources 11
F. Water and Sewer Service 12
G. Utility Service 12
H. Transportation Narrative and Summary 13
I. Landscaping Standards 15
J. Parking and Loading 16
K. Stormwater Management 16
L. Tree Preservation 17
M. Development Standards 17
SECTION II – LAND USE DESIGNATION AND DEFINITIONS
A. Introduction and Narrative 19
B. Allowed Land Uses 19
C. Declaration of Restrictive Covenants 21
D. Allowed Density and Transfer of Density between Planning Areas 21
E. Definitions of Land Use Terms and Density Terms 21
Page5
Page5
EXHIBITS
Exhibit A –Jasper County Land Use Map 27
Exhibit B – Location Map 28
Exhibit C – Concept Master Plan 30
Exhibit D – Parcel Map Area 31
Exhibit E – Survey 33
Exhibit F – SHPO Report 35
Exhibit G –National Register Criterion for Evaluation 49
Exhibit H – Water & Sewer Provider Approval Letter 50
Exhibit I – Electric provider approval letter 51
Exhibit J- Telecommunications Provider letter 52
Exhibit K – Gas provider approval letter 53
Exhibit L – Site Topographic maps 54
Exhibit M – Traffic Impact Study 57
Appendix – 95 Logistics Center and the Jasper County 159
Comprehensive Plan
Page6
Page6
I. INTRODUCTION AND NARRATIVE
1. 95 Logistics Center(“PDD”) is comprised of that certain real property, Tax
PIN 041-00-02-012 and Pin 041-00-02-010 located in Jasper County, “(the
County)” South Carolina (the “property”) as more particularly described
in on the survey as attached in Exhibit E and will be developed by the
Silverman Group “(Developer)”.
2. The present Owner is Eagle Associates of Niagara Frontier, Inc., which is
a N.Y. Corporation, and its principal address, 4155 Walden Avenue,
Lancaster, N.Y.14086. The Assistant Vice President of the Company is
Jonathan Taber, P.O. Box 3854, Bluffton, SC 29910.
3. The Developer is pursuing Rezoning of the Property to a Planned
Development District (“PDD”) designation through Jasper County Article
8.1 Ordinance for Special Purpose Districts and a future mutual
agreement for Development Agreement (“Development Agreement”)
with the County. The Developer has the Property und er contract to
purchase from Eagle Associates, and that closing of the contract is
conditioned upon approval of the PDD. Following closing Silverman
Group will be the Owner.
A. PROPERTY
1. The Property is located within Jasper County, and we are proposing this
PDD document. It is bounded by U.S. Highway US17 to the west, US
Interstate 95 to the east, property located in the City Hardeeville to the
South and a 22 -acre parcel to the north, that is located in the City of
Hardeeville zoned Community Commercial that is not a part of this PDD.
2. The adjoining property line to the northern adjacent parcel is
approximately one thousand five hundred and nine lineal feet (1,509
LF). The western border along US 17 is three thousand four hundred
twenty-six lineal feet (3426 LF) of which adjacent to the western
boundary are privately owned parcels totaling two thousand eight
hundred twenty nine lineal feet (2,829 LF) of frontage.
On the southern side adjacent to Best Avenue is one thousand twelve
lineal feet (1,012 LF) which adjoins the private property along the south
side of Best Avenue. Along U.S. Highway US 17, Whyte -Hardee
Boulevard, there are five parcels connecting to the development with
a total distance of five hundred and ninety-seven (597.54 LF). A list of all
adjacent property owners and the tax ID numbers have been supplied
to the Jasper County Planning Staff.
Page7
Page7
On the southwest boundary adjoining McTeer Street, the property total s
eight hundred thirty-two linear feet (832 LF).
On the West side of the property is four thousand one hundred and
seventy-eight linear feet (4178 LF) of frontage along US Interstate I-95.
To the South the property line runs one thousand seven hundred sixty feet
(1760 LF) adjoining approximate 25-acre tract located in the City of
Hardeeville.
The Hardeeville Recreation Center land, was donated by the present
owner of the Jasper County tract, Eagle Associates of Niagara Frontier, Inc
The attached Exhibit D and Exhibit E plat provides information of the
Property and shows the following information:
a. Vicinity map
b. Boundary and dimensions
c. Existing adjacent streets
d. Adjacent property owners
e. Existing easements/ right of way.
3. The Property consists of approximately 226.94 AC total area broken
down between 162.35 AC total upland and 64.59 AC of freshwater
wetlands. The property does not have critical area of frontage on salt
marsh or creeks. The wetlands delineation survey(s) attached as Exhibit
E depicts the freshwater wetlands on the site(s). Verification of the
delineation with the United States Army Corps of Engineers (USACOE) is
ongoing at this time. Flood zones for the property are indicated on the
boundary surveys attached as Exhibit E.
4. Project Narrative
Silverman Group, the developer and future owner, has vast
experience in successful E -Commerce Distribution Center
developments. It is the intent and goal of the Developer to create
a Logistics and Distribution Center in Jasper County that is a P DD
district that:
a. Is appropriately located in an area that is consistent with Jasper
Counties long-range planning and the Comprehensive Plan. See
Comprehensive Plan notes in the Appendix.
b. Begins improving the transportation network area at the two access
points as per the Whyte - Hardee Boulevard Master Plan.
Page8
Page8
c. Strengthens Jasper County economic base and provides
employment opportunities for residents and surrounding
communities.
d. Protects and enhance the protection of freshwater wetlands and
wildlife habitat for the gross acreage of the 226.94.
e. Becomes one of the important shareholders with the two entrances
in regard to Whyte - Hardee Boulevard as envisioned in the
Boulevard Masterplan.
f. Contributes to the overall economic stability of Jaspe r County
through fees to be paid that will assure the continued high level of
civic services provided by Jasper County.
g. Sets examples for smart light industrial and distribution and clean
growth that is ever expanding due to e-commerce.
h. Brings national t enants to Jasper County along with their jobs and
families.
i. It is estimated that the capital investment for this project is in excess
of +/- $150,000,000. This size investment impacts positively the local
economy.
j. The long -term impact on the project cre ating potentially +/ - 2170
direct/indirect jobs that can only benefit the local economy.
k. The local and induced sales and output from this development are
estimated to be over $196,763,570 per year.
l. The local impact from the employment compensation is estimated
at $93,599,256 per year.
m. It should be noted that the development has already been
responsible for a 5 -acre tract donation on John Smith Rd. for the
construction of the Hardeeville Recreation Center . This is an
important contribution of the project to the community.
Page9
Page9
B. PLANNED DEVELOPMENT DISTRICT PROCESS
1. The Planned Development District (PDD) Zoning was adopted by
Jasper County to permit and encourage the effective, efficient, and
economic development of large tracts of land that are in the best
interests of the long -range development plans of the C ounty.
Following zoning approval a Development Agreement will be
mutually approved by the County and the Developer. The intent of
which is to protect the rights and entitlements specified in the 95
Logistics Center PDD for the property from the effect of subsequently
enacted local legislation or from the effects of changing policies
and procedures of local government agencies which may conflict
with any term or provision of the 95 Logistics PDD or in any way
hinder, restrict, or prevent the development of the project. The
Development Agreement will provide reasonable certainty as to the
lawful requirements that must be met in protecting vested property
rights, while maintaining the authority and duty of government to
enforce laws and regulations which promote the public safety,
health, and general welfare of the citizens of our State. Th e
Development Agreement is being made and entered between
Applicant and Jasper County, under the terms of the SC Code 6-31-
10, et seq, for the purpose of providing assurances to the Applicant
that it may proceed without encountering future changes in law
which would materially affect the ability to develop under the plan,
and for the purpose of providing important protection to the natural
environment and long term financial stability and a viable tax base
to the Jasper County.
2. The Conceptual plan and the provisions of the 95 Logistics Center
PDD will constitute the zoning for the Property and a waiver from the
current County codes and regulations where differences occur. The
Conceptual Plan may introduce land uses that do not exist in current
zoning documents.
C. CONCEPTUAL MASTER PLAN
1. The goal of the PDD and Conceptual Master Plan is to provide
guidelines to produce a high quality, light industrial and distribution
development that raises the quality of life and development
standards in the area while anticipating the future needs for
commerce and services. The PDD designation is necessary to
Page10
Page10
accommodate the land uses and to provide for the responsib le
planning development of the property over time
2. The Conceptual Master Plan for the Property, prepared by HRC is
attached as Exhibit C . This depicts the general roadway layout.
These designations are general and may be modified under the
terms and condi tions of the PDD. Proposed land uses in the
development are detailed under Section 2 – Land Use Designation
and Definitions. The Conceptual Master Plan seeks to maintain open
space requirements set forth in the Jasper County Ordinance and
Land Development Regulations.
3. Article 8.1 in the Special Purpose Districts, revised April 17, 2017 shall
serve as the guide to zoning and unified planning and
development. This PDD shall conform to the Jasper County
Comprehensive Land Use Plan and Land Use Map unless any
specific difference is approved by County Council within this
document. The open space and amenities, if any, will be owned
and maintained by the Owner/Developer, their successors or assigns
or other legally designated entity. All property deeded to a
governmental entity shall become the maintenance responsibility of
that entity or as otherwise provide in accordance with the 95
Logistics Center Development Agreement with Jasper County.
4. This Application and Concept Plan meets all requirements of
section, Article 8.1 unless exceptions approved within this PDD.
5. The Conceptual Master Plan and the provisions of this PDD will
constitute the zoning for the Property and a waiver from the current
Jasper County Zoning and Development Ordinance where
differences occur. The mo st current version of the Ordinance is not
attached but is included as part of the PDD document.
D. ENVIRONMENTAL PROTECTION
1. Environmental protection is a priority for the applicant. As part of the
development process, wetlands evaluation was conducted by Atlas
Environmental in April of 2021 and revised in November 2021 - see
Exhibit F. The developers will meet the stormwater management
requirements of Jasper County and the requirements of South
Page11
Page11
Carolina Department of Health and Environmental Control-Office of
Ocean and Coastal Resource Management (SCDHEC-OCRM).
2. As part of the development process, the developers will meet or
exceed the stormwater management requirements of the Jasper
County and the requirements of South Carolina Department of
Health and Environmental Control Office of Coastal Resource
Management (SCDHEC-OCRM). The Applicant/Owner will prepare
stormwater management plans for each phase of development in
accordance with a stormwater drainage master plan to be
prepared by a professional engineering firm licensed by the State of
South Carolina prior to the development of any phase. The
stormwater drainage master plan will address the hydrological
characteristics of the entire site, as well as adjacent drainage
patterns of relative importance. The plan will address pre -
development conditions and post -development stormwater
management for flood control and sediment reduction. This plan will
also address storm water quality to enhance water quality and
protect the surrounding freshwater wetlands.
3. Freshwater wetlands on the property are typical of the South
Carolina Low Country. Approximately twenty-eight percent of the
site consists of freshwater wetlands, a copy of the wetlands survey is
included. A request for the Jurisd ictional determination has been
sent to the U.S. Army Corps of Engineers and their response is
pending.
4. If any on-site wetland impacts are necessary during development of
the Property, they will be permitted jointly through the U.S. Army
Corps of Engineers and/or SCDHEC-OCRM. All impact mitigation will
meet or exceed state or federal standards in effect at that time.
E. CULTURAL AND HISTORICAL RESOURCES
1. As part of a comprehensive study of the property, a cultural
resources assessment was conducted by Atlas Environmental in April
2021 and revised in November 2021 for the Property. Prior to
development, cultural resources issues, if any, will be addressed in
accordance with the South Carolina Department of Archives and
History regulations. No requirements in connection with historical or
cultural resources pertaining to the Property, other than as may be
Page12
Page12
required by the State of South Carolina in accordan ce with
applicable law shall be imposed on the Property.
F. WATER AND SEWER SERVICE
1. Water and sewer service will be provided to any development in the
Property by Beaufort Jasper Water and Sewer Authority (“BJWSA”)
or other governmental utility provider in accordance with BJWSA’s
agreement of consolidation . Planning for the water and sewer
systems will commence at the time of Development Agreement and
Planned Development District Approval by the City. Preliminary
discussions with BJWSA indicate a willingn ess to serve the property
as evidenced by the Intent to Serve letter included as Exhibit H.
BJWSA operates and maintains water and sewer systems within their
service area upon completion by the developer and acceptance
by the Authority. All development, wi th the exception of irrigation,
incidental maintenance facilities, and small remote facilities will be
provided with public potable water and sewer prior to occupancy
except as may be exempted by provisions of the Development
Agreement.
G. UTILITY SERVICE
1. The Property is in the service territory of Dominion Energy for
electrical power. The Applicant will coordinate with Dominion
Energy regarding planning for the Interstate Distribution Center at
Hardeeville PDD. See attached letter in Exhibit I.
2. Hargray or another licensed provider will provide telephone service
to the Property. The Applicant will coordinate with the provider
regarding planning for the Property. All servicing is anticipated to be
via fiber optics cable to include broadband capabil ity. The
Requirement for Letter of Intent to Provide Service Is currently being
submitted to Hargray. See attached request letter in Exhibit J.
3. The Property is in the service territory of Dominion Energy for gas. The
Applicant will coordinate with Dominion Energy regarding planning
for the Interstate Distribution Center at Hardeeville PDD. See
attached Letter in Exhibit K.
Page13
Page13
4. Other utility services shall be provided by legally established entities
at the discretion of the Applicant or subsequent developers,
provided such are in accordance with the franchising
ordinances/licensing with the City.
5. Utilities must be underground, except as reasonably necessary for
above ground support facilities.
H. TRANSPORTATION NARRATIVE AND SUMMARY
1. 95 LOGISTICS CENTER development is proposed to be located on US
17 adjacent to US I 95 in Jasper County, SC. The development is
planned to consist of a maximum of 2.6 million square feet of light
industrial warehousing, and it is planned to have two new acces s
points on US 17.
2. A previous detailed traffic impact analysis (TIA) was prepared
including the 25 acres of land in the City of Hardeeville. A new TIA is
being prepared and will be provided upon completion that is
specific to this PDD.
3. The proposed development was assumed to be complete by 2026 in
the TIA.
4. Existing Conditions
a. Roadways in the project vicinity include I -95, US 17, US 278, and
John Smith Road.
b. I-95 is a four-lane, divided interstate with a posted speed limit of
70 miles per hour (mph) in the vicinity of the US 278 access ramps.
Per South Carolina Department of Transportation (SCDOT)
counts, I -95 has a 2019 annual average daily traffic (AADT) of
56,300 vehicles per day (vpd) north of US 278 and 62,700 vpd
south of US 278. There is a diamond interchange at the US 278
exit.
c. US 278 (Independence Boulevard) is a five -lane roadway with a
two-way, left -turn lane (TWLTL) and a posted speed limit of 45
Page14
Page14
mph from US 17 to Medical Center Drive. US 278 is designated as
a principal arterial roadway east of I-95 and a minor arterial west
of I-95. US 278 transitions to a four -lane, divided principal arterial
roadway with a landscaped median and a 60 mph speed limit
east of Medical Center Drive. Per SCDOT counts, US 278 has a
2019 AADT of 30,000 vpd east of I-95 and 4,100 vpd west of I-95.
d. US 17 (Whyte Hardee Boulevard) is a two -lane, undivided, major
collector roadway with a posted speed limit of 55 mph just north
of John Smith Road and is 45 mph for the remainder of the study
area. Per SCDOT counts, US 17 has a 2019 AADT of 2,600 vpd north
of US 278 and 4,200 vpd south of US 278. The proposed
development has two planned full access driveways (Site
Driveway #1 and Site Driveway #2) on US 17. A masterplan for
the Whyte-Hardee Boulevard has recently been developed.
5. Whyte-Hardee Masterplan
a. A masterplan was recently completed for the US 17 Corridor
adjacent to the site -Whyte-Hardee Boulevard Master Plan.
The access areas from US 17 primary improvements
contemplated to set examples for others to follow in the future
as visioned in the Masterplan.
i. “Streetscape improvements including street trees, side
path (east side), and bioretention
ii. Sound abating wall at access points were adjacent to
existing residences.
iii. Parking areas of existing businesses can be screened from
Whyte-Hardee.
iv. New development with a consistent setback and limited
up-front parking can create a more harmonious
streetscape
6. Traffic Study Summary
a. The study area for the TIA included the following intersections:
i. US 17 at US 278 (unsignalized)
Page15
Page15
ii. US 278 at I-95 SB On-Ramp/Off-Ramp (signalized)
iii. US 278 at I-95 NB On-Ramp/Off Ramp (unsignalized)
iv. US 17 at Site Driveway #1 (unsignalized) (2026 Build conditions
only)
v. US 17 a t Site Driveway #2 (unsignalized) (2026 Build conditions
only)
b. Based on results of the previous analysis the following
transportation related improvements are recommended.
Improvements may change based on the new TIA.
i. Completion of a detailed traffic signal warrant analysis when
traffic volumes are realized
ii. US 17 at Site Driveway #1
1. Installation of an exclusive southbound left-turn lane on US 17
2. If this driveway becomes a major driveway during the site
plan development, an exclusive southbound left-turn lane on
US 17 could be considered
3. Location and design details to be coordinated with the South
Carolina Department of Transportation (SCDOT) and City of
Hardeeville
iii. US 17 at Site Driveway #2
1. Installation of an exclusive northbound right -turn lane on US
17
2. Installation of an exclusive southbound left-turn lane on US 17
3. Location and design details to be coordinated with SCDOT
and City of Hardeeville
7. Results in this report are based solely on traffic studies and are
considered input into final design considerations. The final design will
be determined by the project engineer after other design elements
(such as, but not limited to, utilities, stormwater, etc.) are taken into
consideration.
I. LANDSCAPING STANDARDS
1. Owner or Developer shall adopt landscaping standards for the
Property which shall be submitted to Jasper for approval prior to
Page16
Page16
each Master Plan Approval, for the development proposed under
the Master Plan submittal.
2. Landscape Standards will comply with th e Jasper County
Landscaping and tree removal ordinances.
J. PARKING AND LOADING
1. Parking and Loading standards will comply with the requirements of
Jasper County Ordinances unless modified during the Initial Master
Plan Process.
a. The total number of required parking spaces for all land uses
allowed herein shall conform to Jasper County Parking and
Loading ordinances. Deviations may be allowed provided the
applicant furnishes actual documentation that the new
standard meets the parking needs of the proposed land uses
and the County approves at each Master Plan approval.
K. STORMWATER MANAGEMENT
1. 95 Logistics Center shall conform to the Stormwater Management
Provisions of the Jasper County ordinances predating this PDD
Agreement and applicable state and federal requirements.
Stormwater best management practices will be employed in the
development of the property to ensure runoff leaving the site meets
SCDHEC-OCRM standards for water quality.
2. The Owner will prepare stormwater management plans for each
master planned structure as it is developed in accordance with a
stormwater master plan to be prepared by a professional
engineering firm licensed in the State of South Carolina prio r to the
development of any Phase. The stormwater master drainage plan
will address the hydrological characteristics of the entire site, as well
as adjacent drainage patterns of relative importance. The plan will
address pre -development conditions and post –development
stormwater management for flood control and sediment reduction.
See Topographic Map Exhibit K that will be used by the engineers
for stormwater management to be submitted at masterplan and
development permit.
Page17
Page17
L. TREE PRESERVATION
1. The minimum allowable post -development tree coverage for all
development shall be 15 trees, two inches in dbh (diame ter breast
height) or larger per acre within the area of the Master Plan.
Preserved wetlands and buffers can be used to meet this
requirement. The minimum post development tree coverage
requirement shall apply to the entire boundary of the PDD and shall
not be phase -specific; however, tree coverage for 95 Logistic
Center tract shall be calculated . All minimum tree coverage and
Tree Protection will meet or exceed the Jasper County tree
ordinance.
a. In those cases where the minimum allowable tree coverage
cannot be met by preservation within the area of the Master
Plan, replacement trees shall be planted to meet the total
number of trees per acre County requirement. Replacement
trees must be planted within the boundaries of the area of the
Master P lan. Replacement trees may also be provided by
identifying existing hardwood trees between 2.5
inches and 7 inches in diameter of the same type being
removed that will be preserved. These trees must be identified
by a tree survey and may be located anywhere within the PDD.
2. In lieu of a tree survey, areas including pine trees existing as part of
planted pine crop area shall be represented on an exhibit illustrating
the area containing the planted pine tree pattern with row, tree
spacing, and typical size . The information will be field verified to
ensure accuracy of the exhibit's factor, but each tree in the pine
crop area will not be physically located by standard survey
methods. Hardwood trees twelve (12") inches DBH and greater will
be located.
M. DEVELOPMENT STANDARDS
1. Site development within the 95 Logistics Center Tract PDD will be
controlled by the development standards set forth in this document,
the Development Agreement, and the Jasper County Ordinances.
Page18
Page18
Page19
Page19
Page20
Page20
II. LAND USE DESIGNATION AND DEFINITIONS
A. INTRODUCTION AND NARRATIVE
1. The Property has t wo parcels with a total of 2 26.94 gross acres. The
parcels, 041 -00-02-010 and 041 -00-02-012, are located in Jasper
County. Both parcels are proposed to be rezoned according to this
PDD.
2. 95 Logistics Center PDD contains a total acreage of approximately
226.94 See Exhibit B.
3. The land uses areas indicated on the Conceptual Master Plan are not
intended to be rigid and exact boundary lines for future land uses and
improvements. The Conceptual M aster Plan for the Property shall
maintain reasonable flexibility as may be requested by Owner and its
successors and assigns to accommodate specific soil conditions,
environmental concerns, physical constraints, market conditions, and
design parameters: and as such, the exact location of boundary lines
and buildings and their subsequent location and size indicated within
planning area shall be subject to change at the time of Master
Planning of the specific tracts within the Property and at the time
Development Permit plans are submitted for development, provided,
however, that maximum densities and other conditions of this PDD
and the Development Agreement between the C ounty and
Developer will be strictly adhered to, unless adjustment is requested
by the Developer, its successors or assigns and approved by the
County. The boundaries of the Property may be modified to included
adjacent acreage subject to the approval of Jasper County by
appropriate petition/application to the C ounty to amend the PDD
and the Development Agreement. The current boundary survey is
attached in Exhibit B.
B. ALLOWED LAND USES
1. The following land uses, Distribution, Light Industrial, and Utility
Substation shall be permitted in the 95 Logistics Center PDD. The
purpose of this portion of the document is to state which land uses shall
be allowed within the 95 Logistics Center PDD, however by allowing
Page21
Page21
these uses this does not obligate the Applicant or subsequent
developer to provide the uses or facilities stated herein.
2. Any easement that occurs within the Property shall have the same
allowed land uses as any of the adjacent land uses. Any restrictions
shall be based on the legal definition of the easement.
3. Design Standards shall be submitted at each Master Plan stage and
may have standards deviating from the Jasper County Zoning
Ordinance and Land Development Regulations or this PDD, provided
that health, safety, ingress/egress, and fire protection concerns are
addressed to the satisfaction of the C ounty, unless otherwise agreed
at the Initial Master Plan approval or in this PDD, the standards for uses
from the Land Development Regulations shall apply.
4. Business Park/Light Industrial/ Distribution Operations
This designation allows for a multi -use Business Park to meet regional
demands for Light Industrial, Distribution, Office, and Services that
pertain to Distribution. Permitted uses included:
a. Establishments involved in, regional warehouses, distribution
operations, back -office operations and related service
businesses, public utility facility, radio and/or television station
and/or transmission tower, off -street parking or storage areas for
customers, clients, or employee-owned vehicles and call centers.
b. Build-to property lines will be allowed to reduce cost of utilities and
to create a more pedestrian friendly environment as long as fire
protection between adjacent and party walls are strictly adhered
to and visual design standards are met.
c. Light Industrial and permitted uses shall provide a minimum buffer
of 50 feet from adjacent residential uses not separated by a road
right-of-way or wetland of equal width (including wetland buffers)
5. Performance Standards for this district will be determined by the
Design Regulations described at the time of Master Plan Submittal.
6. Light Industrial and Distribution Operations acreage shall also include
the uses as included in the General Commercial Uses as defined by
Jasper County and shall have no cap placed on unit density (building
square footage per acre), provided such is in compliance with overall
Page22
Page22
PDD density, stormwater, parking, buffering, landscaping, and other
site design other site requirements of the PDD and Land Development
Regulations at the time of PDD approval . All development shall be
subject to the provisions of this 95 Logistics Center PDD.
C. DECLARATION OF RESTRICTIVE COVENANTS
1. There will be no covenants as the Silverman Group will own the entire
parcel, roads, buildings, etc. Should the Silverman group, or future
owner, wish to add covenants they will be submitted for approval to
Jasper County to consider the PDD being amended.
D. ALLOWED DENSITY
1. The 95 Logistics Center PDD consists of approximately 2 26.94 gross
acres (including wetlands). This will be generally depicted on the
Conceptual Master Plan.
2. 95 Logistics Center Use and Density:
a. The density is estimated to be a maximum of 2.6 million square
feet of distribution warehouse.
b. Light Industrial: The acreage will be shown at the Master Plan
submittal.
c. Three Billboard locations will be permitted where approved by
Jasper County Sign Ordinance along US 95 and will be
submitted for approval at the Master Plan submittal.
d. There is no overall cap on general building square footage,
provided the proposed Master Plans and Development Plans
comply with stormwater, parking, open space, building
setbacks, buffering, landscaping, traffic, and other site design
requirements of the PDD.
E. DEFINITIONS OF LAND USE TERMS AND DENSITY TERMS
In the absence of a term definition in this PDD or in the proposed
Development Agreement with Jasper County , the definitions of the
Land Development Ordinance at the time of PDD approval shall apply
in the interpretation of this Conceptual Master Plan. The locations of
Page23
Page23
specific land uses are not fixed and may vary. However, the definitions
below shall generally describe the allowed uses within the 95 Logistics
Center.
1. Acre
a. Gross Acre s hall mean the entire acreage within the site
boundaries.
b. Net Acre shall mean the acre which remains after deduction
of easements for existing utilities, wetland buffers, and onsite
wetlands.
c. Build-to-property lines will be allowed to reduce cost of utilities
and create a more pedestrian friendly environment as long as
fire protection between adjacent and party -walls is strictly
adhered to and visual design standards are met.
2. Open Space
Total open space for the parcels shall be calculated based on their
combined acreage and not on a site -specific basis for each phase
of development or project located therein. The open space shall
provide at least 15% total open space based upon total gross
acreage.
Passive open space shall consist of the following:
a. Landscape surface areas (areas not covered by buildings,
parking, impervious surface)
b. Lagoons, ponds, impoundments, and lakes (detention,
retention, or recreational)
c. Freshwater wetlands
i. Only 50% of Freshwater wetlands, Lagoons, Ponds, and
Lakes count towards open space
d. Wetland buffers
e. Forest, wildlife preserves/corridors, conservation areas and
greenbelts
f. Perimeter buffers
Page24
Page24
3. Setbacks and Buffers
a. Building setbacks and buffers shall meet the minimum
requirement established herein and, except as set forth in the
PDD Standards, shall apply to the perimeter of the PDD only;
provided, however, that any required wetlands setbacks shall
apply according to law throughout the Property. All other
internal setbacks and buffers shall be established at the time
of Initial Master Plan approval for the specific phase.
b. Perimeter setbacks and buffer standards shall include:
The building setback and natural buffe r from SC Highway 17
shall be 50 feet and US I-95 and the North and South adjacent
property lines shall be 25 feet with landscaping and no parking.
Underground utilities and stormwater management facilities
are allowed in the perimeter buffer area.
4. Signage Control
a. Any and all street signage and marketing signage within the
property of 95 Logistics Center PDD shall be governed by the
Silverman Group as well as reviewed and approved by Jasper
County Planning staff. Entrance monumentation fronting
public ROWs will be governed by the ordinance existing at the
time of PDD approval , but permanent monumentation at
each entrance will be allowed at a minimum. Allowable
signage SF will be per Jasper County Ordinance.
5. Silviculture
a. This designation allows for continuation of managed forestry.
Silviculture includes the practice of plant ing, culture, and
harvesting of trees for the purpose of producing wood fiber
and timber. Generally accepted methods of forest
management are permitted, including wildlife management,
construction and use of forest roads, and practices to promote
health and growth of trees. Silviculture uses may continue up
to the time a subdivision plat is recorded and must be in
accordance with standard forestry BMPs. The Silverman Group
shall be permitted to plan t and grow trees upon the Property
Page25
Page25
which may be used for tree farming for harvesting of such trees
for purposes of replanting same in locations which are on or off
the Property and may engage in farming operations which are
indigenous to the area.
6. Wetlands
a. This designation allows the following uses within wetlands.
Freshwater wetlands on the property shall be those areas over
which the applicable governmental agencies claim
jurisdiction for freshwater wetlands. The following are permitted
uses:
i. Open space and buffers
ii. Conservation areas
iii. Activities in all wetland areas as permitted by the U.S. Army
Corps of Engineers and the South Carolina Department of
Health and Environmental Control, Office of Ocean, and
Coastal Resource Management.
iv. Disposal of reclaimed water as permitted by SCDHEC.
v. Storm water management and recreational lakes.
vi. Boardwalks, trails, bridges and other permitted structures.
vii. Game Management
7. Business Park/Industrial Park
a. This designation allows for a multiuse business park to meet
regional demands for industrial, office, and industrial services.
i. Permitted uses include:
1. Regional warehouses
2. Distribution cartage or express operations and facilities
3. Back-office operations
4. Office space
5. Office/warehouse operations
6. Public utility facility
7. Radio and/or television stations and/or transmission tower
8. Off street parking or storage area for customer, client, or
employee-owned vehicles
9. Call centers
10. Motor freight terminals defined as facilities used for the
transfer of goods
11. Accessory uses which are necessary to the conduct of the
permitted uses herein including but not limited to office
Page26
Page26
uses, indoor and outdoor storage of materials and
maintenance facilities for permitted uses; provided
however they are operated and maintained under the
same ownership, on the same lot as the permitted use, and
do not include structures or featu res inconsistent with the
permitted uses.
12. Activities relating to the loading, unloading, storage, and
processing of bulk products, within traditional or non -
traditional buildings or in open air, with no limit on the
amount of space so utilized.
13. Tractor tra iler parking adjacent to buildings, as needed,
and tractor trailer storage (coupled or uncoupled) areas
containing up to 60 tractor trailers per acre.
ii. Build-to-property lines will be allowed to reduce cost of utilities
and create a more pedestrian friendly environment as long as
fire protection between adjacent and party -walls is strictly
adhered to, and visual design standards are met. Industrial
uses shall provide a minimum buffer of fifty feet (50’) from
adjacent residential uses not separated by a road right of way,
or wetland of an equal width (including wetland buffer).,
Performance Standards for this district will be determined by
the Design Regulations at the time of Master Plan Submittal.
iii. An applicant must demonstrate, at the time of Master Plan
submittal, that uses are approved in an appropriate manner to
address traffic flow, safety, and compatibility of adjoining uses.
Any use that may involve harmless chemical and handling or
storage must demonstrate safety planning which meets all
Federal and State standards and is acceptable to the County
engineer.
8. Utilities
a. This designation allows for utility service to serve the Interstate
Distribution Center at Hardeeville PDD. The following land uses
shall be allowed only after written approval from the
Applicant/developer and its consultants for location and
design. Screening, buffering, and other aesthetic matters must
meet or exceed the County Zoning and Land Development
Regulations at the time of site development application.
i. Potable water supply and distribution
ii. Wastewater collection, treatment, and disposal
Page27
Page27
iii. Stormwater collection, treatment, and detention
iv. Irrigation
v. Communication towers
vi. Satellite antennas
vii. Cable television facilities
viii. Telephone facilities
ix. Power transmission and distribution
x. Fiber optic lines
xi. Other utility services i.e., Internet access a nd other
telecommunication uses.
b. Certain community -wide infrastructure is required for the
development of any large, master -planned community. This
infrastructure may include, but is not limited to the following:
i. Arterial streets and primary access roads.
ii. Water supply.
iii. Wastewater Collection, Treatment and Effluent Disposal.
iv. Power substations.
v. Central telephone facilities.
vi. Stormwater Management Lagoons.
vii. Natural Gas Supply
Page28
Page28
EXHIBITS
EXHIBIT A: Jasper County Land Use Map
Page29
Page29
EXHIBIT B: Location Map
Location Map
Page30
Page30
Location Map
Page31
Page31
EXHIBIT C : Concept Master Plan
Page32
Page32
EXHIBIT D: PARCEL MAP AREA
Page33
Page33
PARCEL MAP AREA CHART
Page34
Page34
Exhibit E: Survey Map
Page35
Page35
Page36
Page36
EXHIBIT F : SHPO Report
Waters of the US and State Delineation
Draft Report of Findings
November 17, 2021 February 17-19, 2021, April 9,
2021, and November 3-4, 2021
(Fieldwork)
Project Area: ~ 226.93 acres Jasper County PIN(s): 041-00-
02-010
Attn: Mr. Holden Sabato 195 Morristown Road
Basking Ridge, NJ 07920
Prepared By:
S. Sharon Amity Road, #411 Charlotte, North
Carolina 28211
Page37
Page37
Summary of Findings
Atlas Environmental Inc. staff conducted a pedestrian survey of the one Jasper
County parcel of the Whyte Hardee Blvd review area. The project is located
approximately 1.5 miles Northeast of Hardeeville between Interstate 95 and
Highway 17 at 464 John Smith Road, Hardeeville, SC 29927. During the field
evaluations in February, April, and November of 2021 Atlas staff observed one
Corps jurisdictional wetland and eight isolated, non-Corps regulated, wetlands.
No streams or impoundments were observed within the review area.
Stream and Wetland Delineation
Introduction
At the request of The Silverman Group staff from Atlas Environmental, Inc. (Atlas)
performed a detailed pedestrian survey of the subject parcel(s) to identify the
presence of surface waters and wetlands that are subject to Federal and State
regulations. Surface waters such as perennial (pRPW’s) and intermittent (s-RPW’s)
streams and their impoundments are subject to Section 401 and Section 404 of
the Clean Water Act. An area is deter mined to be a jurisdictional wetland if it
exhibits wetland hydrology, hydrophytic vegetation, and hydric soil
characteristics. These characteristics are required to be in accordance with the
definitions in the U.S. Army Corps of Engineers (Corps) Wetland Delineation
Manual from 1987. Federally non -jurisdictional wetlands may be subject to the
South Carolina Department of Health & Environmental Control (DHEC) Coastal
Zone Consistency Section.
Surface Waters
The field delineation of assessed jurisdiction al stream features was conducted
utilizing current methodologies which are consistent with those outlined in the
1987 US Army Corps Wetland Delineation Manual , the Regional Supplement of
the Corps of Engineers Wetland Delineation
Manual: Eastern Mountains and Piedmont Region (Version2.0), April 2012 , post
Rapanos Supreme Court decision guidance (2007), other Regulatory Guidance
Letters provided by the Corps, the latest SC DHEC Methodology for Identification
of Intermittent and Perennial Streams, and SC DHE C Coastal Zone Consistency
Wetlands Rules. Evaluations and assessments regarding jurisdictional limits,
permitting requirements and allowances, mitigation ratios and plans, Section 7
consultation (protected species), and Section 6 consultation (historic a nd
archaeological resources) made by consultants are subject to verification by the
Corps, SC DHEC, and other appropriate state and local regulatory authorities.
Page38
Page38
Potential jurisdictional streams on site were evaluated based upon criteria
outlined in the resources mentioned above. This includes assessment with
regards to the geomorphology, hydrology, and aquatic biology of each
feature. Typical indicators are presence of an “ordinary highwater mark”,
sediment sorting, evidence of flow, absence of vegetation, and presence of
macro benthos or other aquatic wildlife. Upon review of the existing site
conditions, Atlas has assessed that there are no relatively permanent
jurisdictional waters (streams) present on the property. Other drainage features
were determined to be non-jurisdictional non-relatively permanent waters.
Wetlands and Isolated
Wetlands
Potential wetland areas on the site were evaluated for the presence of hydric soils,
evidence of wetland hydrology, and hydrophytic vegetation. In these areas,
hydrologic proof would be the existence of hydric soils with oxidized root channels in
the upper soil horizons that have low chroma matrix colors. Indicators of hydrology may
include water borne deposits, drift lines, scour marks, the presence of crayfish borrows,
redoximorphic concretions, or regional indicators of soil saturation. Hydrophytic
vegetation can range from facultative to obligate wetland plant species.
One Corps jurisdictional wetland and eight federally non-regulated isolated wetlands
were determined to exist within the review area. Wetland WL 1000 is Corps jurisdictional
and is approximately 59.333 acres. Wetlands WL 2000, WL 3000, WL 4000, WL 4100, WL
5000, WL 6000, and WL 7000, and WL 8000 was determined to be isolated based on
current regulations. Wetland WL 2000 is located within an overhead power right-of-way
in the southeast portion of the review area and is approximately 0.751 acre. Wetland
WL 3000 is also located within the overhead power right-of-way in the Southwest portion
of the review area and is approximately 1.444 acres. Wetlands WL 4000 and WL 4100
are located along the Eastern boundary of the review area and are respectively 0.321
acre and 1.037 acres. Wetland WL 5000 is located in the Northeast portion of the
review area is approximately 0.020 acre. Wetland WL 6000 is located directly North of
Wetland WL 5000 along the Northeastern boundary and is approximately 0.089 acre.
Wetland WL 7000 is located along the Western boundary of the review area and is
approximately 1.579 acres. Wetland 8000 is located along the southern boundary of
the review area and is approximately 0.020 acre in area.
All aquatic resources were flagged in the field around the perimeter or along the
centerline if linear. Linear wetland centerlines and wetland perimeters were marked in
the field with sequentially numbered pink flagging with notes that include the location
number and the centerline width (where applicable) at each flag. For linear wetlands
flags were hung directly over the centerlines where possible. Any flags not hung over
the linear wetland centerline should be surveyed at the center of the wetland if a
survey of the flags is desired. A survey will not be necessary for Corps/SC DHEC
permitting. Other drainage features were determined to be uplands.
Page39
Page39
Open Waters
Impoundments of jurisdictional waters are also jurisdictional under Clean Water
Act regulations. Impoundments that have been excavated in high ground are
not jurisdictional. Impoundments that are not Corps jurisdictional may be
captured by SC DHEC’s isolated waters rules. No impoundments/open water,
natural or man-made, were observed within the review areas.
The limits of any jurisdictional streams and wetlands are depicted on Figure 4,
Aquatic Resources Sketch Map. This determination is subject to verification by
the US Army Corps of Engineers and, in some cases, the State agencies charged
with the protection of surface water resources. Figures 1, 2, 3, and 4 were
obtained from County GIS and other public domain data services.
Atlas recommends that formal written concurrence of our assessments
regarding the jurisdictional status of all drainage features onsite be obtained
from the Corps and DHEC. An approved jurisdictional determination will be
valid for five years and can be appealed by the applicant if the Corps does not
concur with the consultant’s findings and the consultant contends that the
delineation is accurate. A preliminary jurisdictional determination does not have
an expiration date but is not appealable. An approved jurisdictional
determination will be required for this project to identify and remove isolated
wetlands from Corps jurisdiction.
Public Sourced Natural Resource
Mapping County GIS Tax Parcel
(Figure1)
The map is helpful to illustrate the tax parcels that make up the project area.
County GIS Topographical Map (Figure 2)
The topographical map is used to illustrate where the likely presence of
drainage features is located on site. These drainage features are field reviewed
during the site evaluation.
County GIS Aerial (Figure 3)
Aerial maps help with site access and orientation in the field. These maps are
also useful for determining likely stream corridors and floodplain areas.
Page40
Page40
Sketch Map of Jurisdictional Features (Figure 4)
Identifies general locations of jurisdictional features as accessed by Atlas staff during
the site visit.
Delineation Findings Summary
In summary Atlas assessed that there is one Corps jurisdictional wetland, eight State
jurisdictional coastal zone wetlands, no streams, and no impoundments. Atlas can
obtain written concurrence of the findings from the Corps/State.
Permitting
In general (with some exceptions) the permitting process is regulatory and not
prohibitory. A Corps 404 permit verification and/or a 401 water quality certification from
SC DHEC is not required for work on the subject property that is restricted to high ground
areas/activities. Construction activities within jurisdictional streams, open waters, and
wetlands (collectively referred to as Waters of the US) and isolated waters require
written authorization by the Corps and/or State water resources agencies prior to
impacts. For most development projects a stormwater management plan will be
required if impervious surfaces exceed 24% over the entire project and/or high-density
areas and/or if stormwater is not treated with predominantly vegetated conveyances
for low density projects.
Impacts of 0.005 acre and less to any identified streams and fills of less than 0.1 acre of
jurisdictional open waters and wetlands are typically standard to permit under the
Nationwide Permit program and may not require compensatory mitigation for impacts.
Impacts to 0.0051 acre of stream up to 0.05 acre of stream and from 0.1 acre to 0.5
acre of open waters and wetlands impacts may be authorized under the Nationwide
Permit program as well, but a more thorough review for avoidance and minimization of
impacts will be conducted by both the Corps and the State. Compensatory mitigation
will be required for stream, open water, and wetland losses under this permitting
scenario. Unavoidable impacts that exceed these thresholds may likely only be
authorized under an Individual Permit and Water Quality Certification, and these
permits involve a public notice and comment periods and may involve a public
hearing. Impacts to greater than 0.05 acre of intermittent stream may be allowed
under a Nationwide Permit so long as the Corps district engineer and other regulatory
agencies approve the waiver.
Once an acceptable site plan is produced, Atlas can assist with the preparation and
submittal of a Pre-Construction Notification (permit application) to the Corps and SC
DHEC if it is determined that impacts are unavoidable. The likely Nationwide Permit that
is applicable for industrial/commercial development is Nationwide Permit (NWP) 39.
The Corps will review the application for eligibility under NWP 39 which includes a review
for impacts to cultural and historic resources, natural heritage resources, impacts within
FEMA regulated floodplains, and threatened and endangered species. Upon their
determination that the proposed development is not likely to adversely impact those
resources, they will issue their permit verification. SC DHEC will review the application for
impacts to water quality and aquatic life. Storm water control and treatment design
Page41
Page41
will be reviewed by the local delegated authority, if applicable, otherwise SC DHEC will
need to review and approve storm water plans. Based on site plans an Individual
Permit will be required for wetland impacts.
The following link to the full text of the Corps Nationwide Permit 39 is provided for your
review:
2021 Nationwide Permit (oclc.org)
Permitting Summary
If impacts to Waters of the US and/or isolated wetlands are necessary for site
development a Corps permit and/or SC DHEC water quality certification may be
required. Nationwide permits are usually limited to ½ acre of stream/wetland/open
water impacts as well as 0.05 acre of stream impacts. Individual permits require an
elevated review process including a public notice, alternatives analysis, and
environmental assessment.
Recommendations
The following is a very general summary of the recommended next steps.
1. Desktop and fieldwork review for Federal protected species (Section 107) and
submittal package to FWS for the Corps and/or SC DHEC permit application.
2. Desktop and fieldwork review for historical and archaeological (Section 6) and
submittal package to SC SHPO for the Corps and/or SC DHEC permit application.
3. Submit a delineation approval package to the Corps/ SC DHEC.
4. Conduct a site visit with the Corps to confirm their approval of the delineation.
5. Conduct a site visit with SC DHEC to confirm their approval of the delineation.
6. Obtain Corps verification of the Atlas delineation – valid for five years or unlimited.
7. Submit a permit application to the Corps and SC DHEC for wetland impacts, if
necessary.
Conclusion
This concludes our project review and report of findings for the stream and wetland
delineation. We appreciate the opportunity to provide these services. Please feel free
to call with questions or to discuss this report.
Best regards,
Jennifer L Robertson, President
Page42
Page42
Jurisdictional Waters of the US and State
Figures
Page43
Page43
Page44
Page44
Page45
Page45
Page46
Page46
Page47
Page47
Page48
Page48
Page49
Page49
Atlas Environmental, Inc. 338 S. Sharon Amity Road, Charlotte, NC 28211; 704-512-1206
April 06, 2021 Page 7
WL 1000 near Northern End of Property
Forested area near Northern End
Previously logged area
Previously logged area
Power Line Right-of-way
Previously logged area near Jasper Highway
Page50
Page50
Exhibit G: Appendix D-National Register Criterion For Evaluation
Atlas Environmental, Inc. 338 S. Sharon Amity Road, Charlotte, NC 28211; 704-512-1206
April 06, 2021 Page 21
60.4 Criteria for evaluation.
The criteria applied to evaluate properties (other than areas of the National Park System and National Historic
Landmarks) for the National Register are listed below. These criteria are worded in a manner to provide for a wide
diversity of resources. The following criteria shall be used in evaluating properties for nomination to the National
Register, by NPS in reviewing nominations, and for evaluating National Register eligibility of properties. Guidance in
applying the criteria is further discussed in the “How To” publications, Standards & Guidelines sheets and Keeper's
opinions of the National Register. Such materials are available upon request.
National Register criteria for evaluation. The quality of significance in American history, architecture, archeology, engineering, and
culture is present in districts, sites, buildings, structures, and objects that possess integrity of location, design, setting, materials,
workmanship, feeling, and association and
(a) that are associated with events that have made a significant contribution to the broad patterns of our history; or
(b) that are associated with the lives of persons significant in our past; or
(c) that embody the distinctive characteristics of a type, period, or method of construction, or that represent the work of a master,
or that possess high artistic values, or that represent a significant and distinguishable entity whose components may lack individual
distinction; or
(d) that have yielded, or may be likely to yield, information important in prehistory or history.
Criteria considerations. Ordinarily cemeteries, birthplaces, or graves of historical figures, properties owned by religious institutions
or used for religious purposes, structures that have been moved from their original locations, reconstructed historic buildings, properties
primarily commemorative in nature, and properties that have achieved significance within the past 50 years shall not be considered
eligible for the National Register. However, such properties will qualify if they are integral parts of districts that do meet the criteria of if
they fall within the following categories:
(a) A religious property deriving primary significance from architectural or artistic distinction or historical importance; or
(b) A building or structure removed from its original location but which is significant primarily for architectural value, or which is the
surviving structure most importantly associated with a historic person or event; or
(c) A birthplace or grave of a historical figure of outstanding importance if there is no appropriate site or building directly
associated with his productive life.
(d) A cemetery which derives its primary significance from graves of persons of transcendent importance, from age, from
distinctive design features, or from association with historic events; or
(e) A reconstructed building when accurately executed in a suitable environment and presented in a dignified manner as part of a
restoration master plan, and when no other building or structure with the same association has survived; or
(f) A property primarily commemorative in intent if design, age, tradition, or symbolic value has invested it with its own exceptional
significance; or
(g) A property achieving significance within the past 50 years if it is of exceptional importance.
This exception is described further in NPS “How To” #2, entitled “How to Evaluate and Nominate Potential National Register Properties
That Have Achieved Significance Within the Last 50 Years” which is available from the National Register of Historic Places Division,
National Park Service, United States Department of the Interior, Washington, D.C. 20240.
Page51
Page51
EXHIBIT H: WATER & SEWER PROVIDER APPROVAL LETTER
Page52
Page52
EXHIBIT I: ELECTRIC PROVIDER APROVAL LETTER
Letter of Power Availability
April 20, 2021
Correspondence Sent Electronically
Gidget Crook
HRC Engineering
Douglasville, GA 30134
Re: Jasper Co., S.C. Parcel 0-41-00-02-12
Ms. Crook,
I am pleased to inform you that Dominion Energy will be able to provide electric service to the above
referenced project. Electric service will be provided in accordance with Dominion Energy General
Terms and Conditions, other documents on file with the South Carolina Public Service Commission,
and the company’s standard operating policies and procedures. To begin engineering work for the
project, the following information will need to be provided:
1.) Detailed utility site plan (AutoCAD format preferred) showing water, sewer, and storm
drainage as well as requested service point/transformer location.
2.) Additional drawings that indicate wetlands boundaries, tree survey with barricade plan
and buffer zones (if required), as well as any existing or additional easements will also be
needed.
3.) Electric load breakdown by type with riser diagrams and desired metering specifications.
Please note that for multi-occupancy residential developments per SC Public Service Commission
Regulation 103-327(A): All service delivered to new multi-occupancy residential premises at which
units of such premises are separately rented, leased or owned shall be delivered by an electric utility
based on individual meter measurement for each dwelling
Dominion Energy construction standards and specifications are available here:
https://www.dominionenergy.com/south-carolina/start-stop-service/new-construction
If you have any questions, please contact me at 843-540-1315.
Sincerely,
Parks Moss
Parks Moss
Senior Key Account Manager
Dominion Energy South Carolina
Page53
Page53
EXHIBIT J: TELECOMMUNICATIONS PROVIDER LETTER
THE TELECOMMUNICATIONS PROVIDER LETTER REQUEST IS ATTACHED. THE
APPROVAL LETTER WILL BE SUBMITTED WITH THE MASTER PLAN SUBMISSION.
Page54
Page54
EXHIBIT K: GAS PROVIDER APPROVAL LETTER
Page55
Page55
EXHIBIT L: SITE TOPOGRPAHIC MAPS (MAP A)
Page56
Page56
EXHIBIT L: SITE TOPOGRPAHIC MAPS (MAP B)
Page57
Page57
Traffic Impact Analysis
95 Logistics Center
Jasper County, SC
Prepared for:
SL Hardeeville Industrial Park LLC
Bihl Engineering, LLC 2022
B
I
H
L
E
N
G
I
N
E
E
R
I
N
G
Page58
Page58
TABLE OF CONTENTS
Page No.
1.0 EXECUTIVE SUMMARY ................................................................................................................... 60
2.0 INTRODUCTION .............................................................................................................................. 62
3.0 INVENTORY .................................................................................................................................... 62
3.1 STUDY AREA ...................................................................................................................................... 62
3.2 EXISTING CONDITIONS ......................................................................................................................... 62
3.3 WHYTE-HARDEE MASTERPLAN .............................................................................................................. 63
4.0 TRAFFIC GENERATION .................................................................................................................... 63
5.0 SITE TRAFFIC DISTRIBUTION ........................................................................................................... 64
6.0 TRAFFIC VOLUMES ......................................................................................................................... 64
6.1 EXISTING TRAFFIC................................................................................................................................ 64
6.2 2026 NO BUILD TRAFFIC ...................................................................................................................... 65
6.3 PROJECT TRAFFIC ................................................................................................................................ 65
6.4 2026 BUILD TRAFFIC ........................................................................................................................... 66
7.0 CAPACITY ANALYSIS ....................................................................................................................... 66
7.1 US 17 AT US 278 ............................................................................................................................... 67
7.2 US 278 AT I-95 SB ON-RAMP/OFF-RAMP .............................................................................................. 67
7.3 US 278 AT I-95 NB ON-RAMP/OFF-RAMP ............................................................................................. 69
7.4 US 17 AT JOHN SMITH ROAD ................................................................................................................ 69
7.5 US 17 AT SITE DRIVEWAY #1 ................................................................................................................. 69
7.6 US 17 AT SITE DRIVEWAY #2 ................................................................................................................. 70
8.0 CONCLUSION ................................................................................................................................... 70
Page59
Page59
April 2021
(Updated July 2021)
i (Updated January 2022)
LIST OF TABLES
Table No. Title Page No.
Table 1: Trip Generation ..................................................................................................................5
Table 2: Level of Service and Delay ..................................................................................................9
Page60
Page60
1.0 Executive Summary
The 95 Logistics Center development is proposed to be located on US 17 in Jasper County, SC. The
development is planned to consist of a maximum of 2.6 million square feet of industrial warehousing,
and it is planned to have two new full access driveways on US 17. For the purposes of this traffic impact
analysis (TIA), the proposed development is assumed to be complete by 2026.
This report presents the trip generation, distribution, traffic analyses, and any recommendations for
transportation improvements required to meet anticipated traffic demands.
The study area for the TIA included the following intersections:
• US 17 at US 278 (unsignalized)
• US 278 at I-95 SB On-Ramp/Off-Ramp (signalized)
• US 278 at I-95 NB On-Ramp/Off Ramp (unsignalized)
• US 17 at John Smith Road (unsignalized)
• US 17 at Site Driveway #1 (unsignalized) (2026 Build conditions only)
• US 17 at Site Driveway #2 (unsignalized) (2026 Build conditions only)
Due to the COVID-19 pandemic, traffic volumes and travel patterns have been impacted. All turning
movements were adjusted using AM and PM adjustment factors as recommended by South Carolina
Department of Transportation (SCDOT) District 6. These adjusted traffic volumes were used in the
Existing conditions analysis.
Three 2026 Build conditions were studied: 2026 Build with no Improvements, 2026 Build with
Improvements, and 2026 Build with improvements with the I-95 NB On-Ramp/Off-Ramp intersection
signalized.
Based on the results of the analysis, the unsignalized intersection of US 17 at US 278 currently operates
acceptably and is projected to continue to operate acceptably in the 2026 No Build and 2026 Build
conditions.
The signalized intersection of US 278 at I-95 SB On-Ramp/Off-Ramp currently operates acceptably. In the
2026 No Build conditions, the intersection is projected to continue to operate acceptably. In the 2026
Build conditions, the intersection is projected to operate acceptably during the AM peak hour and with
elevated delay during the PM peak hour. When coordinated with the US 278 at I-95 NB On-Ramp/Off-
Ramp intersection in the 2026 Build with improvements with I-95 NB Off-Ramp Signalized conditions,
the intersection is projected to operate acceptably.
The unsignalized intersection of US 278 at I-95 NB On-Ramp/Off-Ramp currently operates acceptably
and is projected to continue to operate acceptably in the 2026 No Build conditions. In the 2026 Build
conditions, the intersection is projected to operate with elevated delay during the AM and PM peak
hours. It is recommended that a detailed traffic signal warrant analysis be performed at this intersection
when traffic volumes are realized. Based on the analysis, the intersection is projected to operate
Page61
Page61
acceptably when signalized and coordinated with the intersection of US 278 at I-95 SB On-Ramp/Off-
Ramp.
The unsignalized intersection of US 17 at John Smith Road currently operates with elevated delay during
the AM peak hour and acceptably during the PM peak hour. In the 2026 No Build and 2026 Build
conditions, the intersection is projected to operate with elevated delay during the AM and PM peak
hour conditions. An exclusive northbound right-turn lane is recommended in the 2026 Build with
Improvements conditions. With the exclusive northbound right-turn lane, the intersection is projected
to improve but continue to operate with elevated delay in the 2026 Build with Improvements
conditions.
The site driveways are projected to operate acceptably in the 2026 Build conditions with
implementation of the recommended southbound left-turn lane improvements at both driveways.
Based on results of the analysis the following transportation related improvements are recommended.
• US 17 at US 278 o Refresh all pavement markings and striping on all approaches
of the intersection
• US 278 at I-95 SB On-Ramp/Off-Ramp o Optimize traffic signal timings
• US 278 at I -95 NB On-Ramp/Off Ramp o Monitor intersection traffic volumes
and perform traffic signal warrant analysis yearly or at a schedule requested by
Jasper County and/or SCDOT
o Signalize intersection once traffic signal warrants are met and coordinate signal
timings with the US 278 at I-95 SB On-Ramp/Off-Ramp intersection
• US 17 at John Smith Road o Installation of an exclusive northbound right-turn
lane on US 17
• US 17 at Site D riveway #1 o Installation of an exclusive southbound left -turn
lane on US 17
o Installation of exclusive left - and right -turn exiting lanes on Site Driveway #1 o
Location and design details to be coordinated with the SCDOT and Jasper County
• US 17 at Site D riveway #2 o Installation of an exclusive southbound left -turn
lane on US 17 o Installation of exclusive left- and right-turn exiting lanes on Site
Driveway #2 o Location and design details to be coordinated with SCDOT and
Jasper County
Results in this report are based solely on traffic studies and are considered input into final design
considerations. The final design will be determined by the project engineer after other design elements
(such as, but not limited to, utilities, stormwater, etc.) are taken into consideration.
Page62
Page62
2.0 Introduction
The 95 Logistics Center development is proposed to be located on US 17 in Jasper County, SC. The
development is planned to consist of a maximum of 2.6 million square feet of industrial warehousing,
and it is planned to have two new full access driveways on US 17. For the purposes of this TIA, the
proposed development is assumed to be complete by 2026.
3.0 Inventory
3.1 Study Area
The study area for the TIA includes the following existing intersections:
• US 17 at US 278
• US 278 at I-95 SB On-Ramp/Off-Ramp
• US 278 at I-95 NB On-Ramp/Off Ramp
• US 17 at John Smith Road
Figure 1 (Appendix) shows the site location and Figure 2 (Appendix) shows the project conceptual site
plan.
3.2 Existing Conditions
Roadways in the project vicinity include I-95, US 17, US 278, and John Smith Road.
I-95 is a four-lane, divided interstate with a posted speed limit of 70 miles per hour (mph) in the vicinity
of the US 278 access ramps. Per SCDOT counts, I-95 has a 2019 annual average daily traffic (AADT) of
56,300 vehicles per day (vpd) north of US 278 and 62,700 vpd south of US 278. There is a diamond
interchange at the US 278 exit.
US 278 (Independence Boulevard) is a five-lane roadway with a two-way, left-turn lane (TWLTL) and a
posted speed limit of 45 mph from US 17 to Medical Center Drive. US 278 is designated as a principal
arterial roadway east of I-95 and a minor arterial west of I-95. US 278 transitions to a four-lane, divided
principal arterial roadway with a landscaped median and a 60 mph speed limit east of Medical Center
Drive. Per SCDOT counts, US 278 has a 2019 AADT of 30,000 vpd east of I-95 and 4,100 vpd west of I-95.
It is recommended that the pavement markings and striping in the vicinity of the intersections be
refreshed.
US 17 (Whyte Hardee Boulevard) is a two-lane, undivided, major collector roadway with a posted speed
limit of 55 mph just north of John Smith Road and is 45 mph for the remainder of the study area. Per
SCDOT counts, US 17 has a 2019 AADT of 2,600 vpd north of US 278 and 4,200 vpd south of US 278. The
proposed development has two planned full access driveways (Site Driveway #1 and Site Driveway
#2) on US 17. A masterplan for the Whyte-Hardee Boulevard has recently been developed. A summary
of the masterplan is discussed in the following section.
Page63
Page63
John Smith Road (S-141) is a two-lane, undivided, major collector roadway with a posted speed limit of
55 mph east of Royal Live Oaks Academy Driveway and 35 mph west of Royal Live Oaks Academy
Driveway. Per SCDOT counts, John Smith Road has a 2019 AADT of 5,700 vpd in the vicinity of the site.
Figure 3 (Appendix) shows the existing roadway laneage in the study area.
3.3 Whyte-Hardee Masterplan
A masterplan was recently completed for the US 17 Corridor adjacent to the site – Whyte-Hardee
Boulevard Master Plan. The area the corridor is located on is called, “The Business Park District.” The
primary improvements contemplated in this area are Streetscape improvements from Garr Road to Best
Street and sidepath improvements from Garr Road to US 278. Based on the report, estimated costs for
the streetscape are $510,000 and $1,120,000 for the sidepath. An illustrative scenario was created at
the intersection of Whyte-Hardee at John Smith Road with the following conceptual components.
• “Streetscape improvements including street trees, sidepath (east side), and bioretention
• Sidepath that would serve as the East Coast Greenway as well as another side path on the north
side of John Smith Road connecting the new Recreation Center and Royal Live Oaks Academy
• Parking area of existing businesses can be screened from Whyte -Hardee and John Smith while
continuing to operate
• New development with a consistent setback and limited up -front parking can create a more
harmonious streetscape
• Limited curb cuts and cross access helps to minimize pedestrian vehicle conflicts. Even if certain
existing conditions force parking in the right-of-way, there are opportunities for it to be formalized
with better design while accommodating through-traffic”
4.0 Traffic Generation
The trip generation of the proposed development was determined using trip generation rates published
in the Institute of Transportation Engineers’ (ITE) Trip Generation, 10th Edition (2017).
Table 1 summarizes the AM and PM peak hour trips associated with the proposed site.
As shown in Table 1, the proposed development is projected to generate 337 new trips during the AM
peak hour (259 entering and 78 exiting) and 340 trips during the PM peak hour (92 entering and 248
exiting).
Page64
Page64
Table 1:
Trip Generation
Land Use and Intensity
ITE Land Use
Code
AM Peak Hour PM Peak Hour
Total In Out Total In Out
2,600,000 square feet of Industrial
Warehousing 150 337 259 78 340 92 248
New Trips 337 259 78 340 92 248
Source: ITE Trip Generation, 10th Edition
5.0 Site Traffic Distribution
The proposed project traffic was assigned to the surrounding roadway network. The directional
distribution and assignment were based on qualitative knowledge of the project area, quantitative
application of existing traffic patterns, and expected trip length.
The following general trip distribution was applied to the project trips associated with the proposed
development:
• 20% to/from the north on I-95
• 3% to/from the north on US 17
• 30% to/from the south on I-95
• 20% to/from the south on US 17
• 27% to/from the east on US 278
Figure 4 (Appendix) shows the traffic distribution for the site in the study area.
6.0 Traffic Volumes
6.1 Existing Traffic
Peak hour intersection turning movement counts including vehicular, pedestrian, and heavy vehicle
traffic were performed in March 2021 from 7:00 AM to 9:00 AM and from 4:00 PM to 6:00 PM at the
following intersection:
US 17 at John Smith Road
Page65
Page65
Due to the COVID-19 pandemic, traffic volumes and travel patterns have been impacted. All turning
movement counts performed in March 2021 were adjusted using AM and PM peak hour adjustment
factors of 1.15 and 1.02 for the AM and PM peak hours, respectively, as stated in the SCDOT District 6
Traffic Impact Analyses during COVID-19 Pandemic (Update) memorandum (February 5, 2021). These
adjusted traffic volumes were used in the Existing conditions analysis.
Historic peak hour intersection turning movement counts including vehicular, pedestrian, and heavy
vehicle traffic collected in July 2020 from 7:00 AM to 9:00 AM and from 4:00 PM to 6:00 PM were used
for the intersection of US 17 at US 278. Due to the COVID-19 pandemic, turning movement counts
performed in July 2020 were adjusted using AM and PM peak hour adjustment factors of 1.16 and 1.11
for the AM and PM peak hours, respectively, as stated in the SCDOT District 6 Traffic Impact Analyses
during COVID-19 Pandemic memorandum (April 23. 2020). The counts were then grown to the Year
2021 by applying an overall growth rate of 4.0% per year (based on historic growth trends) for use in the
Existing conditions analysis.
Historic peak hour intersection turning movement counts including vehicular, pedestrian, and heavy
vehicle traffic collected in August 2019 from 7:00 AM to 9:00 AM and from 4:00 PM to 6:00 PM were
used for the intersections of US 278 at I-95 NB On-Ramp/Off-Ramp and US 278 at I-95 SB On-Ramp/Off-
Ramp. The counts were grown to the Year 2021 by applying an overall growth rate of 4.0% per year
(based on historic growth trends) for use in the Existing conditions analysis.
The grown Existing peak hour intersection turning movement volumes are shown on Figure 5
(Appendix). The turning movement count data is included in the Appendix.
6.2 2026 No Build Traffic
Historic growth is the increase in existing traffic volumes due to usage increases and non-specific growth
throughout the area. An overall growth rate of 4.0% was applied to the study area in the analysis. In
addition to this non-specific growth, projected traffic associated with the Inspired Living at Hardeeville
development, which is currently in the planning process, was also included in the background traffic.
The 2026 No Build traffic volumes include existing traffic grown to the buildout year. Figure 6
(Appendix) and Figure 7 (Appendix) show the 2026 No Build AM and PM peak hour traffic volumes,
respectively.
6.3 Project Traffic
The AM peak hour and PM peak hour projected project trips were assigned based on the trip
distribution discussed in Section 5.
Page66
Page66
6.4 2026 Build Traffic
The 2026 total traffic volumes include the 2026 background traffic and the proposed development
traffic at buildout. The 2026 AM and PM peak hour total traffic volumes are shown in Figure 6
(Appendix) and Figure 7 (Appendix), respectively.
Three 2026 Build conditions were studied: 2026 Build with no Improvements, 2026 Build with
Improvements, and 2026 Build with improvements with the I-95 NB On-Ramp/Off-Ramp intersection
signalized.
Intersection volume development worksheets are included in the Appendix.
7.0 Capacity Analysis
Capacity analyses were performed for the AM and PM peak hours in the Existing, 2026 No Build, and
2026 Build conditions (no improvements, improvements, improvements with signalization of US 278 at
I-95 NB On-Ramp/Off Ramp) using the Synchro, Version 10, software to determine the operating
characteristics of the adjacent roadway network and the impacts of the proposed project. The analyses
were conducted with methodologies contained in the Highway Capacity Manual, 6th Edition (HCM 6)
(Transportation Research Board, 2016). The Synchro analysis worksheets are provided in the Appendix.
Capacity of an intersection is defined as the maximum number of vehicles that can pass through an
intersection during a specified time, typically an hour. Capacity is described by level of service (LOS) for
the operating characteristics of an intersection. LOS is a qualitative measure that describes operational
conditions and motorist perceptions within a traffic stream. HCM 6 defines six levels of service, LOS A
through LOS F, with A being the best and F being the worst.
LOS for signalized intersections is determined by the overall intersection operations and is reflected in
average delay per vehicle. LOS D or better is typically considered acceptable for signalized intersections.
LOS for a two-way stop-controlled (TWSC) intersection is determined by the delay of the poorest
performing minor approach, as LOS is not defined for TWSC intersections as a whole. It is typical for
minor stop-controlled side streets and driveways on major streets to experience longer delays at LOS E
and LOS F during peak hours while the majority of the traffic moving through the corridor typically
experiences little or no delay.
Capacity analyses were performed for the Existing, 2026 No Build, 2026 Build, 2026 Build with
Improvements, and 2026 Build with Improvements with Signalization of US 278 at I-95 NB On-Ramp/Off
Ramp AM and PM peak hour traffic conditions for the following intersections:
• US 17 at US 278 (unsignalized)
• US 278 at I-95 SB On-Ramp/Off-Ramp (signalized)
Page67
Page67
• US 278 at I-95 NB On-Ramp/Off Ramp (unsignalized)
• US 17 at John Smith Road (unsignalized)
• US 17 at Site Driveway #1 (unsignalized) (All 2026 Build conditions only)
• US 17 at Site Driveway #2 (unsignalized) (All 2026 Build conditions only)
Any peak hour factors (PHF) above 0.95 were adjusted to 0.95 in all conditions for the purposes of the
analysis.
Any heavy vehicle percentages (HV%) below 2.0% were adjusted to 2.0% in all conditions for the
purposes of the analysis. Due to the industrial nature of the development, a HV% of 20% was assumed
at Site Driveway #1 and Site Driveway #2. The HV% was adjusted in the 2026 Build conditions at the
study area intersections to reflect the higher percentage of expected heavy vehicle traffic due to the
projected site traffic.
Table 2 summarizes LOS and control delay (average seconds of delay per vehicle) for the projected
Existing, 2026 No Build, 2026 Build, 2026 Build with Improvements, and 2026 Build with Improvements
with Signalization of US 278 at I-95 NB On-Ramp/Off Ramp AM and PM peak hour conditions at the
study area intersections.
7.1 US 17 at US 278
As shown in Table 2, the unsignalized intersection of US 17 at US 278 currently operates acceptably at
LOS B during the AM and PM peak hours. In the 2026 No Build conditions, the intersection is projected
to continue to operate at LOS B during the AM and PM peak hour conditions. In the 2026 Build
conditions, the intersection is projected to operate acceptably at LOS D during the AM peak hour and at
LOS B during the PM peak hour.
7.2 US 278 at I-95 SB On-Ramp/Off-Ramp
This intersection is fully actuated and operates in free mode. To reflect the free operation, the cycle
length and splits were optimized for the Existing, 2026 No Build, and 2026 Build AM and PM peak hour
conditions. As shown in Table 2, the signalized intersection of US 278 at I-95 SB On-Ramp/Off-Ramp
currently operates acceptably at LOS B during the AM peak hour and at LOS C during the PM peak hour.
In the 2026 No Build conditions, the intersection is projected to operate acceptably at LOS C during the
AM peak hour and at LOS D during the PM peak hour. In the 2026 Build conditions and 2026 Build with
Improvements conditions, the intersection is projected to operate acceptably at LOS D during the AM
peak hour and with elevated delay at LOS E during the PM peak hour.
In the 2026 Build with Improvements with Signalization of US 278 at I-95 NB On-Ramp/Off Ramp
conditions, the intersection was updated to actuated coordinated conditions and coordinated with the I-
95 NB On-Ramp/Off Ramp intersection. As shown in Table 2, the signalized intersection is projected to
operate at LOS C in the AM peak hour and LOS D in the PM peak hour conditions.
Page68
Page68
Table 2:
Level of Service and Delay (average seconds per vehicle)
Intersection
Traffic
Control
1
Existing Conditions 2026 No Build
Conditions
2026 Build
Conditions
2026 Build with
Improvements
Conditions
2026 Build with
Improv. with I-95 NB
Off- Ramp Signalized
Conditions
AM Peak
Hour
PM
Peak
Hour
AM
Peak
Hour
PM
Peak
Hour
AM
Peak
Hour
PM Peak
Hour
AM Peak
Hour
PM Peak
Hour
AM Peak
Hour
PM Peak
Hour
US 17 at US
278 U
B
(11.8) –
WB
B
(10.4) –
WB
B
(14.2) –
WB
B
(11.6) –
WB
D
(32.8) –
WB
B
(13.4) –
WB
Same as
Build
conditions
Same as
Build
conditions
Same as
Build
conditions
Same as
Build
conditions
US 278 at
I-95 SB
OnRamp/
Off-Ramp2,3
S B
(19.0)
C
(21.9)
C
(34.6)
D
(50.7)
D
(35.5) E (63.5)
Same as
Build
conditions
Same as
Build
conditions
C
(33.1)
D
(52.0)
US 278 at
I-95 NB On-
Ramp/
Off-Ramp3
U
C
(21.4) –
NB
C
(16.7) –
NB
D
(29.9) –
NB
C
(22.0) –
NB
F
(96.1) –
NB
E
(44.7) –
NB
Same as
Build
conditions
Same as
Build
conditions
A
(6.2)
A
(5.4)
US 17 at John
Smith Road4 U
F
(115.8) –
WB
D
(27.0) –
WB
F
(**) –
WB
F
(95.0) –
WB
F
(**) –
WB
F
(137.3) –
WB
F
(**) –
WB
F
(68.0) –
WB
Same as
Build
conditions
w/ Impr.
Same as
Build
conditions
w/ Impr.
US 17 at Site
Driveway #1 U N/A N/A N/A N/A
B
(13.1) –
WB
B
(13.1) –
WB
Same as
Build
conditions
Same as
Build
conditions
Same as
Build
conditions
Same as
Build
conditions
US 17 at Site
Driveway #2 U N/A N/A N/A N/A
B
(12.5) –
WB
B
(11.7) –
WB
Same as
Build
conditions
Same as
Build
conditions
Same as
Build
conditions
Same as
Build
conditions
N/A – Not Applicable
1. S = Signalized, U = Unsignalized
2. AM and PM peak hour cycle lengths and splits were optimized in all scenarios to reflect free, fully actuated operation.
Minimum cycle length of 120 seconds assumed.
3. In the 2026 Build with Improvements with I-95 NB Off Ramp Signalized conditions, signalized intersections were
coordinated, and cycle length was optimized.
4. (**) indicates delay exceeds 300 seconds
Page69
Page69
7.3 US 278 at I-95 NB On-Ramp/Off-Ramp
As shown in Table 2, the unsignalized intersection of US 278 at I-95 NB On-Ramp/Off-Ramp currently
operates acceptably at LOS C during the AM and PM peak hour conditions. In the 2026 No Build
conditions, the intersection is projected to operate acceptably at LOS D during the AM peak hour and at
LOS C during the PM peak hour. In the 2026 Build conditions, the intersection is projected to operate
with elevated delay at LOS F during the AM peak hour and at LOS E during the PM peak hour.
The 95th percentile queue is considered the maximum number of vehicles that will queue while waiting
to complete their maneuver at the intersection. The maximum queue on the northbound approach (I-95
OffRamp) is expected to be approximately five vehicles during the AM peak hour.
In the 2026 Build with Improvements with Signalization of US 278 at I-95 NB On-Ramp/Off Ramp
conditions, the intersection was updated to actuated coordinated conditions and coordinated with the I-
95 SB On-Ramp/Off Ramp intersection. As shown in Table 2, the signalized intersection is projected to
operate at LOS A in the AM and PM peak hour conditions.
Based on the results of the analysis, it is recommended that the intersection traffic volumes be
monitored and perform traffic signal warrant analysis yearly or at a schedule requested by Jasper
County and/or SCDOT. Once traffic signal warrants are met, it is recommended that the intersection be
signalized intersection. Once traffic signal warrants are met, traffic signal timings with US 278 at I-95 SB
On Ramp/Off-Ramp intersection should be optimized.
7.4 US 17 at John Smith Road
As shown in Table 2, the unsignalized intersection of US 17 at John Smith Road currently operates with
elevated delay at LOS F during the AM peak hour and acceptably at LOS D during the PM peak hour. In
the 2026 No Build and Build conditions, the intersection is projected to operate with elevated delay at
LOS F during the AM and PM peak hour conditions. Due to the number of projected northbound right
turns (background trips) on US 17 in the 2026 Build conditions, an exclusive northbound right-turn lane
is recommended and was included in the 2026 Build with Improvements analysis. With the addition of
the exclusive northbound right-turn lane, the intersection is projected to continue to operate with
elevated delay at LOS F during the AM and PM peak hours in the 2026 Build with Improvements
conditions however the delay is reduced.
7.5 US 17 at Site Driveway #1
SCDOT Roadway Design Manual (2017) guidelines were reviewed at the unsignalized intersection of
US 17 at Site Driveway #1 to determine if criteria were met for the consideration of an exclusive
northbound right-turn lane or an exclusive southbound left-turn lane on US 17. Based on a
comparison of the projected 2026 Build AM and PM peak hour traffic volumes to the criteria, it was
determined that an exclusive southbound left-turn lane on US 17 at Site Driveway #1 “should be
considered” for a two-lane roadway and is therefore recommended. It was also determined that an
exclusive northbound right-turn
Page70
Page70
lane on US 17 at Site Driveway #1 “may not be necessary” for a two-lane roadway and is therefore not
recommended. The exclusive southbound left-turn lane was included in the 2026 Build analysis and the
turn lane analysis charts are included in the Appendix.
As shown in Table 2, the unsignalized intersection of US 17 at Site Driveway #1 is projected to operate
acceptably at LOS B during the AM and PM peak hours in the 2026 Build conditions.
7.6 US 17 at Site Driveway #2
SCDOT Roadway Design Manual (2017) guidelines were reviewed at the unsignalized intersection of US
17 at Site Driveway #2 to determine if criteria were met for the consideration of an exclusive
northbound right-turn lane or an exclusive southbound left-turn lane on US 17. Based on a comparison
of the projected 2026 Build AM and PM peak hour traffic volumes to the criteria, it was determined that
an exclusive southbound left-turn lane on US 17 at Site Driveway #2 “should be considered” for a two-
lane roadway and is therefore recommended. It was also determined that an exclusive northbound
right-turn lane on US 17 at Site Driveway #2 “may not be necessary” for a two-lane roadway and is
therefore not recommended. The exclusive southbound left-turn lane was included in the 2026 Build
analysis and the turn lane analysis charts are included in the Appendix.
As shown in Table 2, the unsignalized intersection of US 17 at Site Driveway #2 is projected to operate
acceptably at LOS B during the AM and PM peak hours in the 2026 Build conditions.
8.0 Conclusion
The 95 Logistics Center development is proposed to be located on US 17 in Jasper County, SC. The
development is planned to consist of a maximum of 2.6 million square feet of industrial warehousing,
and it is planned to have two new full access driveways on US 17. For the purposes of this TIA, the
proposed development is assumed to be complete by 2026.
Based on results of the analysis the following transportation related improvements are recommended.
• US 17 at US 278 o Refresh all pavement markings and striping on all approaches of the
intersection
• US 278 at I-95 SB On-Ramp/Off-Ramp o Optimize traffic signal timings
• US 278 at I -95 NB On -Ramp/Off Ramp o Monitor intersection traffic volumes and
perform traffic signal warrant analysis yearly or at a schedule requested by Jasper
County and/or SCDOT
o Signalize intersection once traffic signal warrants are met and coordinate signal timings
with the US 278 at I-95 SB On-Ramp/Off-Ramp intersection
• US 17 at John Smith Road o Installation of an exclusive northbound right-turn lane on
US 17
Page71
Page71
• US 17 at Site Driveway #1 o Installation of an exclusive southbound left -turn lane on
US 17 o Installation of exclusive left- and right-turn exiting lanes on Site Driveway #1 o
Location and design details to be coordinated with the SCDOT and Jasper County
• US 17 at Site Driveway #2 o Installation of an exclusive southbound left -turn lane on
US 17 o Installation of exclusive left- and right-turn exiting lanes on Site Driveway #2 o
Location and design details to be coordinated with SCDOT and Jasper County
Results in this report are based solely on traffic studies and are considered input into final design
considerations. The final design will be determined by the project engineer after other design elements
(such as, but not limited to, utilities, stormwater, etc.) are taken into consideration.
Page72
Page72
Appendix
Page73
Page73
Page74
Page74
Page75
Page75
Page76
Page76
Page77
Page77
Page78
Page78
Page79
Page79
Page80
Page80
Page81
Page81
Page82
Page82
Page83
Page83
Page84
Page84
Page85
Page85
Page86
Page86
Page87
Page87
Page88
Page88
Page89
Page89
Page90
Page90
Page91
Page91
Page92
Page92
Page93
Page93
Page94
Page94
Page95
Page95
Page96
Page96
Page97
Page97
Page98
Page98
Page99
Page99
Page100
Page100
Page101
Page101
Page102
Page102
Page103
Page103
Page104
Page104
Page105
Page105
Page106
Page106
Page107
Page107
Page108
Page108
Page109
Page109
Page110
Page110
Page111
Page111
Page112
Page112
Page113
Page113
Page114
Page114
Page115
Page115
Page116
Page116
Page117
Page117
Page118
Page118
Page119
Page119
Page120
Page120
Page121
Page121
Page122
Page122
Page123
Page123
Page124
Page124
Page125
Page125
Page126
Page126
Page127
Page127
Page128
Page128
Page129
Page129
Page130
Page130
Page131
Page131
Page132
Page132
Page133
Page133
Page134
Page134
Page135
Page135
Page136
Page136
Page137
Page137
Page138
Page138
Page139
Page139
Page140
Page140
Page141
Page141
Page142
Page142
Page143
Page143
Page144
Page144
Page145
Page145
Page146
Page146
Page147
Page147
Page148
Page148
Page149
Page149
Page150
Page150
Page151
Page151
Page152
Page152
Page153
Page153
Page154
Page154
Page155
Page155
Page156
Page156
Page157
Page157
Page158
Page158
Page159
Page159
APPENDIX:
95 Logistics Center and the Jasper County Comprehensive Plan
• Develop competitive industrial sites and buildings, particularly those focusing
on communications, technology, distribution, energy and telecommunications.
• Establish links for vocational training in high schools with post -secondary
technical training through shared facilities and programs. This has been done in
the past with Silverman Group tenants in other similar developments.
• Increase budget to support needed staffing increases. Fees and taxes paid by
Silverman Group and the new Tenants will help accomplish this.
• Seek opportunities to use access management and design treatments to
improve the mobility of strategic corridors. With further study and DOT review and
approval this will be look to improve 278 and US 17 as well as begin aesthetic
improvements at the two access points on US 17 as envisioned by the Whyte -
Hardee Master Plan.
• Improve existing water, sewer and road infrastructure.
• The project will improve the Employment Status of Jasper County. The estimated
employment increase upon full development will be 2170 new jobs which will
increase the 2016 Employment Status Estimates by 18%.
• The proposed development of a new port on the Savannah River has been a
vision for Jasper County for many years. This project will strengthen the
infrastructure for the Terminal project.
• The sellers donated 5 acres of land for the new Community Center o n John
Smith Road.
• The Comprehensive Plan states to give priority to transportation programs that
retain existing businesses and attract new businesses to the area. This project does
just that.
• Improve access to freight facilities (ports, airfields, in dustrial parks) for people
and freight.
•Impact Fees : A one -time fee based on the cost associated with providing
capital improvements to new homes or businesses. This fee is a per unit exaction
paid at the time property is developed or purchased. These fees are placed into
a special fund for system -wide capital facilities and are determined by fiscal
impact analysis on the future demand a proposed development will have on the
local infrastructure system. The project will be contributing according to the
mutually negotiated Development Agreement.