Town of Hilton Head Island
William Hilton Parkway Gateway Corridor Independent
Review Advisory Committee Meeting
Wednesday, June 12, 2024, 1:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Approval of the Minutes
a. Regular Meeting Minutes of April 22, 2024.
b. Regular Meeting Minutes of May 8, 2024.
3. Unfinished Business
a. Update on Project Progress
4. New Business
a. Presentation of Findings for Downstream Intersection Impacts
b. Consideration of a Resolution to Accept the Findings of the William Hilton
Parkway Gateway Corridor Independent End to End Analysis
5. Appearance by Citizens:
6. Adjournment
FOIA Compliance: Public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
Page 1 of 300
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 2 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/22/2024 Page | 1
Town of Hilton Head Island
WILLIAM HILTON PARKWAY GATEWAY
CORRIDOR INDEPENDENT REVIEW
ADVISORY COMMITTEE MEETING
Monday, April 22, 2024, 1:00 PM
Minutes
1. Call to Order
Mayor Perry called the meeting to order at 1:00 PM. Those present were: Mayor Alan
Perry, Chairman; Diederik Advocaat; Edward C. Warren, Jr.; Charles P. Walczak, PE; and
Willie Young. Absent was: Herbert Ford, Alternate.
2. Approval of the Minutes
a. Meeting Minutes of April 10, 2024 will be approved at the next regular meeting.
Mr. Advocaat stated he had appeared remotely at the April 10, 2024, meeting; however,
he had technical issues with his microphone and was unable to pose questions or
comments. Therefore, he would like his points to be recorded. Point 1: At the last
meeting, there was no discussion or opinion made concerning the bridges - one span vs.
two spans. If you have a 1 span, 11 lane bridge, is that technically feasible or make
sense? Point 2: The on-grade bypass option needs to be given serious consideration. It
is less obtrusive environmentally, has less impact on Stoney, can be a quick connection
to the Cross Island Parkway, has the lowest cost option, and cuts the commute time.
Point 3: The grading matrix produced in my opinion is really comparing apples and
oranges, and you cannot add numbers and come to a conclusion. Point 4: The bike lane
- a cost/benefit analysis should be done, its usage, and whether funds for a bike lane can
be better allocated elsewhere. Point 5: The adaptive management system - you are still
working in clusters at the end of 278, there has to be a way these 2 can be connected
during peak hours to create a better flow, and disabling the Windmill Harbour light during
peak hours should be explored. Point 6: I question whether the bow tie alternative would
actually work, and should be tested in your simulation models. Point 7: What is the cost
picture for the elevated bypass, does it makes sense at all, and has it been discussed
with SCDOT as a potential solution, and what is their opinion? Point 8: The $425M which
has been mentioned as a number, which is a 50% increase. Where does that come from
and how is that put together. All these points I would like Lochmueller to consider, take
them into account, and where applicable, add onto the simulation models.
3. Unfinished Business
Shawn Colin, Assistant Town Manager - Community Development, thanked everyone for
their appearance on such a short notice. He explained that at the last meeting Lochmueller
Page 3 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/22/2024 Page | 2
had presented 4 viable Alternatives to advance for additional evaluation. A comparative
assessment was presented for each of those Alternatives, and the Committee asked for
additional information related to cost, and property impact to both public and private lands.
Lochmueller has developed that additional information, along with a third element relating to
the construction period, based on their professional opinion of the project. He turned the
presentation over to Nate Nohren and his Lochmueller team, with Brad Strader and Brian
Kinzelman available remotely.
Mr. Colin clarified for the Committee that with regard to Mr. Advocaat's points, the matter of
additional funding for this project is not within the scope of work for Lochmueller.
a. Additional Details on Property Impacts, Cost, and Construction Period for
Alternatives.
Nate Nohren, Project Manager for Lochmueller, introduced his team joining the meeting
remotely: Kate Swinford and Michelle Romaine, Traffic Engineering Leads; Chad Costa,
Chief Environental Engineer; Lorne Jackson, Chief Roadway Engineer. He noted this
meeting is designed to present the additional information requested at the April 10
meeting, which included delineating between public and private parcels, providing high
order of magnitude cost estimates as well as estimates for the construction duration, and
a matrix incorporating everything provided.
Mr. Nohren presented slides of the Alternatives, which slides are a part of the
presentation contained in the agenda packet. He briefly outlined on the slides Alternative
#1, Alternative #2, Alternative #3, and Alternative #4. He pointed out the travel time
comparison when compared to 2045 No Build for each Alternative completed in Synchro
for the Hilton Parkway corridor between Moss Creek and Indigo Run. Questions from the
Committee members were answered by Mr. Nohren, Mr. Jackson, and Mr. Colin.
Discussion ensued about whether SCDOT or Beaufort County has reviewed the
Lochmueller plans. Mr. Colin reminded the Committee that a part of the scope for
Lochmueller was a provision to refrain from any communication with the County or
SCDOT during the engineering evaluations and assessments until the Committee
identifies Alternatives to be advanced, at which point any design modifications would then
be shared with both the County and SCDOT for consideration. He also raised the issue of
where additional funding would come from above the original project cost for the deficient
bridge and funding sources from the State Infrastructure Bank, grant, and referendum,
leaving a current deficit of $100M+. While there have been communications, he noted
none were specifically about SCDOT vetting all of the engineering solutions. Mr. Colin
indicated he would like to have the benefit of this meeting's results and the Committee's
position so that he can schedule further conversations this week.
Mr. Nohren concluded his presentation with slides detailing the additional right of way
required for each Alternative, with estimated cost ranging from $426M to $575M, and
estimated construction duration ranging from 36 to 48 months, with the resulting scoring
and ranking. A lengthy discussion followed concerning the scoring system and matrix,
how impact was determined for additional right of way acreage needed, difficulties and
Page 4 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/22/2024 Page | 3
delays that could result, whether a sufficient right of way exists in Stoney to
accommodate a larger paved roadway, and the review being made Lochmueller's
structural engineers of the seismic study,with the initial analysis indicating no feasible way
to retrofit an existing bridge to meet SEE requirements.
Mr. Colin stated that after the last meeting when Lochmueller presented its evaluation
and comparative assessment of the alternatives, the goal was to identify an Alternative
that would be the preferred Alternative to put through the VISSIM model so they could
then perform the deeper analysis and evaluation, and they could move beyond the
current study area, as well, to look at the full end-to-end that was requested down to Sea
Pines Circle and to Wilborn and Indigo Run. Therefore, with the additional information
presented today as requested plus construction duration, they would like the Committee
to weigh in on the Alternative or Alternatives to continue to move forward and advance.
He asked for the Committee's feedback at this time. Each Committee member stated their
current choices and reasoning involved, but no clear consensus was reached.
Discussion continued among the Committee members and Mr. Nohren concerning
keeping a 4-lane bridge, and Mr. Nohren indicated the analyses done by them and other
studies reviewed, indicate this is not practical. Mayor Perry noted there are questions
concerning whether the State Infrastructure Bank, the State House, or other source would
grant the additional funding for the Alternative chosen, and conversations with these
entities needed to be held soon. Mr. Colin agreed that with a potential shortfall in the
current funding, and the failure of the Committee to narrow down the Alternatives for
Lochmueller to proceed into the VISSIM model, it would be appropriate to share the
Alternatives presented by Lochmueller with Beaufort County officials and SCDOT to
determine feasibility and funding availability. The Committee members indicated their
support for that plan, with Mr. Colin to schedule meetings and report back soon.
4. Appearance by Citizens
No citizens have requested to appear before the Committee regarding items not on the
agenda. No comments were received through the Open Town Hall Portal.
A citizen remarked that the traffic lights are not synchronized nor optimized at Spanish
Wells and Squire Pope Road intersections. He also mentioned that cost/value for benefit
gained in minutes should be a consideration.
Christopher Cliffe noted he had attended 32 committee meetings since November 2018
chaired by David Johnson, 12 or more joint broadcasts of Beaufort County and the Town,
numerous Town Council meetings, and at no time during those meetings until recently has
cost come up as a determining factor. He questioned how the construction duration was
computed, where the idea of pedestrian and bike paths originated, whether construction
costs were based on 2022 numbers, and whether there were certain aspects of the bridge
that would be the Town's responsibility.
An Indigo Run resident stressed the need for a fair, transparent, and independent analysis
Page 5 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/22/2024 Page | 4
free from political manipulation, but he questioned whether that is the case. He stated too
much attention is being placed on an oversize bridge and not enough on traffic lights, which
are the real cause of our congestion problems. Better and cheaper options, with less
community impact on the Gullah community, have been suggested and ignored. The
Town's decision will be one of the most consequential decision in years and will impact our
Town for decades.
Louise Miller Cohen, a native of Hilton Head Island, stated God had given her a job to keep
the Gullah Geechee culture alive on Hilton Head Island. All that is remaining is the land left
by their ancestors and passed down to the current generation. She expressed her gratitude
to everyone who feels their pain, and asked the members to put themselves in their shoes
and help them keep their land, their culture, and their community.
5. New Business
None.
6. Adjournment
The meeting was declared adjourned at 2:42 PM.
Approved:
The recording of this Meeting can be found on the Town’s website
at www.hiltonheadislandsc.gov
Page 6 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 1
Town of Hilton Head Island
WILLIAM HILTON PARKWAY GATEWAY
CORRIDOR INDEPENDENT REVIEW
ADVISORY COMMITTEE MEETING
Wednesday, May 8, 2024, 1:00 PM
Minutes
1. Call to Order
Mayor Perry called the meeting to order at 1:00 PM. Present were: Mayor Alan Perry,
Chairman; Diederik Advocaat; Edward C. Warner, Jr.; and Willie Young. Absent were: Charles
P. Walczak and Henry Ford, Alternate.
2. Approval of the Minutes
a. Regular Meeting Minutes of April 10, 2024
Mr. Warner made a motion to approve the minutes as presented, at which time Mr.
Advocaat asked that a sentence on Page 3 describing a discussion with the consultant
concerning a 4-lane bridge in the minutes of the April 10, 2024 meeting be struck. Mayor
Perry asked for a review of the recording to provide more clarification, so the Motion by
Mr. Warner was amended to approve the minutes with the following condition: that the
recording be reviewed and the sentence in question be clarified. The motion was
seconded by Mr. Advocaat and unanimously adopted.
b. Special Meeting Minutes of April 22, 2024
Mr. Warner made a motion to approve the minutes as presented, at which time Mr.
Advocaat questioned whether the Committee had approved Mr. Colin moving forward
with a meeting with Beaufort County and SCDOT concerning the Alternatives as stated in
the minutes of the April 22, 2024 meeting. Mayor Perry asked for a review of the
recording to provide more clarification, so the Motion by Mr. Warner was amended to
approve the minutes with the following condition: that the recording be reviewed and the
question of approval be clarified. The motion was seconded by Mr. Advocaat and
unanimously adopted.
3. Unfinished Business
a. Update on Project Progress
Shawn Colin, Assistant Town Manager - Community Development, noted that Mr. Nohren
and his team would be going through a more in-depth evaluation, but he presented a brief
review of the scope of work and progress made. In addition, he would share the
Page 7 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 2
responses on the Alternatives received from SCDOT at the Committee's request, as well
as SCDOT responses to bridge rehab vs. new bridge, and safety information.
He pointed out that the authorizing resolution for this Committee was to perform 4 key
functions, 3 of which have been completed, with the 4th to move through the scope of
work to make sure it is executed in accordance with the scope that the Committee and
Town Council had adopted, and that is now in progress.
b. Update on Committee Requests
At the last meeting, the Committee requested that there be an evaluation of Alternatives
that were developed independently by Lochmueller, as well as the proposed Alternative
called the Express Bypass, and labeled Bypass 3.1.
Mr. Colin reported that in accordance with the request from the Committee, a trip was
made to Columbia last Wednesday. Alternatives #1, #2, #3, and #4 that were identified in
the Lochmueller presentation, both on April 10 and April 22, were shared with the South
Carolina Department of Transportation (SCDOT) in advance of the trip. The other
Alternative not recommended by Lochmueller, but recommended for submission to
SCDOT for response was the Bypasss 3.1 that has been discussed for some time. After
review, feedback from SCDOT regarding Alternatives was provided at the meeting. They
also provided some information related to the bridge rehab vs. a reconstruction or new
bridge, and did a thorough review of the Alternatives to provide technical evaluation and
feedback related to feasibility or viability of the Alternatives to advance.
Mr. Advocaat questioned why all the Alternatives are being discussed with SCDOT when
the Committee is still reviewing these. Mr. Colin explained he was working under the
unanimous direction of the Committee to have these Alternatives vetted and to provide
feedback. Mayor Perry and Mr. Advocaat disagreed on what had been agreed by the
Committee to seek from the SCDOT and also the role of individual committee members
who discuss matters outside the meeting, which may be construed as representing the
Committee as a whole.
Mr. Colin reiterated that the direction supported by the Committee was to have the
Alternatives vetted and request a response from SCDOT, but there was no direction on
the method used to obtain that information, therefore a meeting was held in Columbia at
which the feedback requested was obtained. He reported the general feedback was
technical in nature related to project implications for costs, implication to the
Environmental Assessment (EA) and timing, implications to funding, and then also,
feasibility to advance through Federal Highway Administration. As a result of the
discussion held on May 1, the SCDOT drafted a response letter, which was officially
submitted by their Deputy Secretary of Transportation and Chief Engineer. A copy of the
letter dated May 2, 2024, from the SCDOT was received after the agenda packet had
been published to the public, however, a copy of that letter is attached to the Minutes and
Page 8 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 3
made a part hereof, and a copy was provided to all Committee members.
Mr. Colin reviewed in detail the comments from the SCDOT letter that were specific to
each Alternative. He noted that Alternatives #2, #3, and #4 are very low on feasibility or
viability to be able to advance based upon the National Environmental Policy Act (NEPA)
process and to get these through Federal Highways with minimizing impacts. These were
the 3 Lochmueller Alternatives.
Questions concerning whether SCDOT provided a breakdown of the $425M cost estimate
and the size bridge this encompassed were addressed by Mr. Colin. He indicated the cost
estimate is based upon the configuration that is included in the EA, with the project being
a 6-lane bridge, with a barrier between eastbound and westbound traffic, including 2-10'
shoulders, one in each direction operating as breakdown lanes, with 6' shoulders on the
interior, having been reduced from 10' shoulders. It includes a 12' bike and pedestrian
pathway along the bridge. He indicated those are the elements that are included, with
mitigation also included that is the original mitigation that the SCDOT and County had
worked on, but in his opinion may not be enough. Mr. Colin indicated he had not
requested detailed breakdown of every line item in the $425M estimate for this project,
especially since no Alternative has yet been selected, and he suggested that at this point
it would be beneficial to look at the comparative assessment between Alternatives to
understand what the approximate cost of each might be. As the EA progressed, he noted
that cost was not a factor in the initial assessment done to vet Alternatives, but instead
was brought in as a secondary criteria, along with other items, as you work through the
NEPA process. He noted there is still an element remaining that is required by the NEPA
process, and that is a value engineering. Once an Alternative is selected, there is an
advance made through Federal Highways and there is a value engineering that must be
done to identify where there may be additional cost-savings for the project.
Mr. Colin identified those attending the meeting in Columbia from the Town as being:
Mayor Perry, Town Manager Marc Orlando, Councilman Alex Brown, Shawn Colin, and
Thomas Boxley, Chairman of the Community Development Corporation. From the
County, those attending were: John Robinson, Interim Administrator, Joe Passiment,
Chairman of Beaufort County Council, and Jared Fralix, PE, Assistant County
Administrator-Infrastructure. Mr. Advocaat noted for the record that he considered the trip
premature and suggested another trip be made after the Committee's evaluation. Mayor
Perry noted Mr. Advocaat's concerns. A question concerning reducing the width of the 3
lanes was answered by Mr. Colin, who indicatied that had been suggested in a previous
conversation with SCDOT several years ago, and the response was concerns about the
volume and speed associated with the bridge, and about freight traffic requiring a 12' foot
lane width. Simply re-striping to accommodate 3-lanes on the existing bridges would not
provide a breakdown lane. The SCDOT suggested that the County with Town support
could submit a design exception that they could possibly support to reduce on Jenkins
Island the 2 interior lanes in each direction to 11', but 12' lanes on the outer lanes should
be maintained for freight traffic.
Page 9 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 4
A motion was made by Mr. Advocaat that the Committee fully consider the horizontal
bypass, and he would like Lochmueller to include in full detail in their evaluatoin. Mr.
Young seconded the motion. Mayor Perry noted this could be done for discussion, but if it
involves an increase in cost, then it must go back to Town Council for approval. Mr.
Advocaat indicated he had been given a proxy from Mr. Walczak, who had indicated his
approval. Mayor Perry noted that Mr. Walczak had given no notice of his proxy. Mayor
Perry indicated while the Committee had not yet been given the Lochmueller
presentation, he was unclear whether this would be beneficial at this point. Discussion
followed concerning the viability of considering this prior to the Lochmueller presentation
and the SCDOT response as to their findings. Mr. Colin offered to provide information to
help make an educated vote, and he requested that Mr. Nohren and any member of the
Lochmueller team to provide their opinion on this alternative from an engineering
standpoint and state whether or not they believe it is a feasible alternative to advance. In
response to Mr. Advocaat's request for an immediate vote, Mayor Perry called for a vote.
The motion passed 3-2, with Mr. Advocaat, Mr. Young, and Mr. Advocaat voting by proxy
on behalf of Mr. Walczak in favor. Those opposed were Mayor Perry and Mr. Warner.
Mr. Colin noted the Express Bypass 3.1 that was most recently submitted was provided to
SCDOT for their input and feedback and accessment on viability for advancement. Due
to the significant amount of impact to the Stoney Community, they thought this would
trigger a full Environmental Impact Statement (EIS), and would increase significantly the
environmental impacts. See full SCDOT comments in Letter dated May 2, 2024, as noted
before and attached to the minutes.
Mr. Colin noted that Alternatives #2, #3 and #4 were given very low feasibility to advance,
and there are statements from SCDOT that they would be eliminated, as is the case with
the Express Bypass that was presented. What was submitted to SCDOT was exactly the
same as what was submitted to the Town for consideration, and this is the response from
SCDOT. They do not believe that the Express Bypass is a viable option on many counts,
including property impact, environmental impact, cost, timeframe, and would not advance
this. Federal Highways would likely reject this option if submitted due to the additional
TCP impact, as it would be counter to their objectives of avoiding or minimizing property
impacts and mitigating, in that order. He asked for Mr. Nohren's professional engineering
opinion on the feasibility of this alternative advancing.
Mr. Nohren indicated that would be a part of his presentation later on the Agenda.
Although it was not included in the scope of services, Lochmueller experts, Loren and
Chad, and from traffic perspective it was also considered, and Lochmueller's would be
provided.
Mr. Advocaat expressed concern about the independent consultant being privy to the
indepth conversations that have taken place with SCDOT and their findings. Mr. Nohren
advised that the information developed by Lochmueller was completed before seeing the
SCDOT document that was emailed to him today, and today's presentation would be their
independent viewpoints on the Bypass.
Page 10 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 5
Mr. Colin reiterated that he could not modify the scope of work just at the direction of this
Committee, as the scope was approved by Town Council. The Committee's charge was
to work with the consultant to move forward consistent with the scope of work they
created. Before a contract amendment could be executed to evaluate this alternative,
Town Council approval would be needed.
Mr. Colin continued with his presentation of the Alternatives which the Committee asked
be vetted through SCDOT, as there have been some questions related to a bridge rehab
vs. a new bridge, SCDOT was asked about the design cost and construction implications
related to bridge rehabilitation vs. new bridge. He noted the existing bridge is approaching
70 years in its lifecycle and is nearing the end of the design lifecycle of 70-75 years set by
SCDOT. Their response was that bridge rehabilitation could be performed, but their
preference is for a new bridge. Mr. Colin also showed a slide of a Heat Map and Collision
Data outlining a significant amount of traffic incidents or collisions from 2016 to 2024
through the bridge corridor section and also as you approach the Stoney Community. The
detailed response from SCDOT, Heat Map, and Collision Data are all shown on the slides
presented by Mr. Colin and included in the agenda packet. These were presented to
provide reasons for advancing a project to put in place a mechanism to provide
improvements in this area, including reducing speeds, traffic calming, and providing a
safer transportation system through this area. He reviewed the Town Council Authorized
Scope of Work, which included an independent study by a consultant to review all the
assumptions, methodologies, and come up with what they believed for alternatives to
advance for this project. They were encouraged to develop their own ideas and
recommend their own alternatives, which in Mr. Colins's opinion has been done. The
proposed plans have to pass NEPA review, and any additional impacts, including safety
and other items that are considered by Federal Highway. He noted that wha Lochmueller
has done is look at the alternatives and viability and ability for them to move through the
NEPA process and have alternatives that are supported by Federal Highway. The
anticipation for completion was set at 6 months. He briefly reviewed the Tasks, noting
those completed, ongoing, provided by staff, or in progress.
c. Presentation of Findings - SCDOT Seismic Study Review
Mr. Nohren noted the members of the Lochmueller team joining the meeting remotely -
Kate, Michelle, Chad, and Loren and new team members, Jason Hickle, structural
department manager who helped perform the analysis of existing bridge data, and Shawn
Dykes, in-house transit expert, who provided input on the Memorandum regarding the
feasibility of trying to maintain 4-lanes west of Squire Pope. Mr. Nohren began his
presentation, which is included in the agenda packet, and included an outline of the
completion data for Tasks #1, #2, #3, #4 and #5, with an overall completion progress of
80%. Mr. Advocaat asked to see the live modeling of the area Hilton Head Plantation to
Moss Creek, and Mr. Nohren indicated that is a part of Task #4, with VISSIM and
Synchro modeling included for the entire study area. Mr. Nohren moved into Task 1.8,
which is the SCDOT Seismic Study Review Findings, which was approved by the
Page 11 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 6
Committee and Town Council. He explained this was a review only of the SCDOT
approved US 278 Bridge Seismic Study, approximately 1800 pages in total, dated April
2020, which was received by Lochmueller on April 15, 2024. The focus for Lochmueller
was on the detailed Life Cycle Cost Analysis (LCCA) to provide their input. He reviewed
the 3 options considered, rehabilitation and seismic retrofits or construction of a new 6-
lane structure similar to the SCDOT Preferred Alternative.
d. Presentation of Finding - Technical Report
Detailed review findings and key observations for Options 1, 2 and 3 can be found in the
presentation included in the agenda packet. In summary, Mr. Nohrens stated Lochmueller
does not recommend rehabilitation and/or retrofit options be pursued. Questions from
Committee members were addressed by the Lochmueller team.
Michelle Romine, Lochmueller team member, attending the meeting remotely, continued
with the 4-Lane Viability Technical Memo (Task 1.3.3). She stated the objective was to
perform a cursory, high-level review to determine if one or more select strategies [second
bridge, modifications to the existing mass transit system, implementation of a new ferry
system, or implementation of a facility usage fee (congestion pricing)] could be
implemented to allow for a 4-lane section of William Hilton Parkway between Moss Creek
and Squire Pope Road, as included in the Agenda Packet. She outlined the various
methods used to arrive at the concluding opinion by Lochmueller that these strategies
should not be considered as viable alternatives to be used individually and/or collectively
to solely address traffic congestion and mobility related concerns along US 278 within the
project study area, to allow a four-lane section to be maintained along US 278 within the
study area. Questions from Committee members were addressed by Ms. Romine.
e. Review of Overall Evaluation Matrix for 4 Alternatives
Mr. Nohren noted that at the April 22, 2024, meeting, a request was made for a
delineation between public and private parcels. With additional information provided by
the Town's GIS staff, Lochmueller used that data to determine if that impacted their
findings. He pointed out that for Alternative #3, the acreage changed from the April 22
acreage of 1.4, and with the new information, the figure has been reduced to 1.1 acres,
which also changes the rankings of the Alternatives. A discussion ensued with Mr.
Advocaat reiterating his opposition to the way the rankings were determined, and the
Lochmueller team noting that ultimately it was providing the Committee with the
information needed to make the final decision and differentiate between the Alternatives
through a high level evaluation. However, if desired, they offered to amend the matrix to
remove the last 2 rows for scoring and ranking purposes. Mr. Colin noted the scope of
work asked for the consultant to determine a way to evaluate, but did not specify exactly
how that was to be accomplished. Elements were added that needed to be included in
the evaluation, and questions could be made about the conclusions and findings that they
have made or presented, but the goal of this Committee is to make sure the project is
being executed against that scope of work. When you ask for an independent review
based on engineering to provide you with information, this has been done according to
the scope of work. You can disagree with some of their conclusions, but not the
Page 12 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 7
methodology. Mr. Advocaat continued to voice his opinion that it was wrong to draw
conclusions on the numbers and the Lochmueller team noted this practice has been
applied across other projects throughout the country, but it should be considered just
another way of screening.
Mr. Colin noted that the first 3 Tasks have been completed to move through the
independent review of all Alternatives, including any additional Alternatives Lochmueller
thought worthy to advance. He reported that feedback has been obtained from SCDOT at
the Committee's direction, and there is an Alternative that is preferred from the SCDOT's
feedback, and there are additional design modifications that could be considered to
reduce the right of way impacts, further reducing the impact to the TCP and the Stoney
Community. He stated that Lochmueller needs to evaluate the downstream impacts to
complete the next few Tasks in the scope of work, so the final informationcan be included
in a delivered report. He has asked Lochmueller to move forward with Alternative #1 with
design modifications to consider based on the feedback received from SCDOT on the
Alternatives, so this could be built into their modeling for VISSIM to fully understand the
downstream impacts.
Mr. Colin reminded the Committee that the current Preferred Alternative that the County
has recommended as part of the EA document, results in 3.4 acres of total impact to the
TCP, with1.12 acres being privately owned property. The current design as you come on-
Island includes 2 left turn lanes from William Hilton Parkway eastbound onto Squire Pope
Road, with a design modification being evaluated by SCDOT from a performance and
right of way impact standpoint, to reduce those 2 left turn lanes eastbound to 1 left turn
lane onto Squire Pope Road. Also, there are currently 2 right turn lanes proposed as you
come southbound on Squire Pope Road and right turn onto William Hilton Parkway
westbound going off-Island. There has been a design modification request made to
SCDOT from the Town and the County to reduce those 2 right turn lanes to 1 right turn
lane, again further reducing the right of way impact on the Squire Pope and William Hilton
Parkway segment. The third modification is that going westbound off-Island, there is a
dedicated left turn only lane that accesses the Crazy Crab Restaurant. There has been a
design modification request to shift that westbound and have that turn lane serve all of
the driveway points on the southern side. The SCDOT has committed to evaluate those
design considerations to see if the right of way and cross-section would be reduced for
the roadway need, and therefore reduce the property impacts that is in the EA proposals
for the current project. We believe there will be significant reductions if those design
modifications are supported, and understanding the relationship between the
transportation corridor land use and the performance of the roadway are all
considerations. One of the primary goals of Federal Highways is social justice and social
impact, so they are significantly interested in alternatives that reduce the impact as much
as possible. That is why the other Alternatives that were shared with the SCDOT were
unlikely to be feasible from their standpoint. Those are the design modifications that we
have requested from SCDOT and are included in the Alternative #1 to move the modeling
for the next phase of the project forward at this time.
Page 13 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 8
Comments and questions were posed by Committee members. Mr. Advocaat reiterated
his opinion that this is still premature without finishing the study and looking at the new
Alternative being put forth today. Mr. Warner questioned how firm the SCDOT is in their
comments, and whether there might be a hesitation on their part. Mr. Colin reported they
were not interested at all in advancing Alternative #4, and as mentioned before, money is
a consideration, and whether there is another viable solution that minimizes the overall
impact and is less expensive. They will consider some additional elements, but the
position that has been conveyed to the Town and the County consistently is that those
additional costs would have to be borne at the local level. He reported that when talks
began about alternatives, they let us know they were not in favor of Alternative #4 with an
elevated bypass, but they are willing to understand design modifications proposed from
local input in the project.
f. Observations Related to Southern "Bypass" Alternative
Ms. Romine continued by noting that although not contained within their scope,
Lochmueller did look at the Southern Bypass. She provided a cursory traffic overview, Mr.
Jackson provided a cursory engineering overview, and Mr. Costa provided a cursory
environmental overview, which are all included in the Agenda Packet. Mr. Advocaat
stated his opinion that the critical element is traffic lights that basically stop traffic coming
onto Hilton Head Island, and the horizontal bypass which circumvents the traffic lights,
should be considered due to less impact on the wetlands and deserves a good look.
Concerns were expressed about impact on the wetlands, timing of construction, traffic
capacity and signals, and other issues by the Committee members. The Lockmueller
team reiterated their opinion that there is no other alignment that could be done that will
not have similar or more impacts as what has already been shared with the Committee.
Mr. Costa stated that although he could not speak for the Federal Highway
Administration, but based on his experience, his professional opinion is that the horizontal
bypass would be a difficult project for them to approve. Mr. Colin noted that what he has
heard from SCDOT concerning the southern bypass is that it has a very, very small
chance, if any, of advancing through the process. Timing of integration of the Windmill
Harbour and Moss Creek lights into the adaptive signal system was also discussed. Mr.
Advocaat pointed out the Southern Bypass would remove traffic from the regular US 278,
and it could be made a toll road if the Town chooses to do so, and would then be a
significant source of income.
4. Appearance by Citizens
Public comments concerning agenda items were to be submitted electronically via the Open
Town Hall Portal. No comments were received through the Portal, and no requests were
received to appear before the Committee regarding non-agenda items. Several citizens
appeared before the Committee and provided comments.
Christopher Cliffe commented that the SCDOT letter was quite explicit, with the Preferred
Alternative being the only solution in their view, with no comments about the Lochmueller
proposal, so it would appear they are making it quite clear that they are only prepared to
Page 14 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 9
consider their option. He asked about a time constraint possible on the life span of the EA
documents. He mentioned that Craig Winn had made it quite clear that the deficiencies in the
McKay bridge had been provided for at a figure of $40M, but the seismic study numbers
revealed today, there is no comparison, and questioned where the $40M figure came from. He
also mentioned that Craig Winn had made it clear that Jenkins Island was not an accident hot
spot, but the 6 fatalities shown on accident data presented today all involved DUI, so including
accident data in SCDOT's Preferred Alternative is slightly misleading. The 6-lanes being
pushed by everyone only pushes congestion further down the road, and the SCDOT
Alternative is not a solution at all.
Mr. Baer congratulated the job being done by the Committee to rationalize that the SCDOT
plan is the one and only true plan with the studies based on a few key principles of staying in
SCDOT's footprint and questioned who authorized this. Secondly, he suggested they have
ignored proving the congestion problem has been solved. He questioned where is the stress
test if you get more than expected, which he predicted would be 4,000 vehicles per hour and
the plan was unproven and would not actually work, and the data has not been presented to
support the plan. He noted there is no value being placed on Gullah Geechee land that is
being taken, and questions from citizens are being ducked with no answers provided, and
called the study the most unscientic study he has ever seen.
Gray Smith commented on time saved eastbound and westbound reported by Lochmueller,
using percentages that make it look worse. Today, the eastbound AM in 2045 would be 7
minutes longer if nothing was done, and westbound coming out would be 5 minutes longer
and questioned the $500M being spent for this. He questioned the SCDOT rejection of all
Alternatives except their own, and erred at the beginning of this project by ending it at Spanish
Wells Road rather than include the adjacent major roadways that are integral to the project,
namely Spanish Wells Road and Gumtree Road, which they say cannot be considered as part
of the project without greatly extending the time of construction. He commented that as a 12-
year Hilton Head Island resident, he is being asked to accept an inferior product at the
outrageous cost of $500M, and he finds this totally unacceptable and asked the Committee to
do the same.
Louise Cohen, a native of Hilton Head Island, noted she is a member of the 5th generation of
her family. She reminded the Committee members that as they serve and make decisions for
other people, they should have a heart and understand how much the highway would affect
the community they live in and that was established by their ancestors as their inheritance.
Their homes mean as much to them as yours means to you, and she urged them to care
about destroying a community, their heritage, and their culture.
Richard Busy expressed his surprise that the beaurocrats in Columbia, the SCDOT, liked their
plan the best. He noted they don't live here - we live here. He noted that due to the vote today,
he would await an impartial and independent by the consultants on the Horizontal Bypass
Plan. However, Mr, Colin has indicated Town Council will need to approve that, and he
questioned whether this was just another obstacle, as this was first time any discussion has
been held on the Horizontal
Page 15 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 10
Bypass Plan - a plan which connects directly to the Cross Island Parkway, uses almost no
private land, is less than half the price of your Plan #4. He pointed out that more than 50% of
the traffic coming onto the Island are bound for the Cross Island Parkway, and yet none of the
plans, including the State plan, provide a direct link to the Parkway. He could not understand
how an 11-lane, aircraft carrier slab, a/k/a the bridges, is in keeping with preserving the
character of Hilton Head Island.
Richard Ritter, a member of the Executive Committee of the new Hilton Head-Bluffton branch
of the NAAPP, noted they are in the process of drafting and submitting to the Town a letter
expressing the concerns of the NAACP about all of the traffic proposals discussed today. The
letter must be approved by the membership and then submitted to the State Conference of the
NAACP for review and approval, so he could not discuss it in detail. He expected to have the
letter ready to be sent to the Mayor within the next 2 weeks. Obviously, the concerns
expressed will be about the impact of the plans on the Stoney and Gullah Geechee
Community as a whole. He questioned whether it was true that Alternative #1 would have no
adverse impact, as they know it will because there are homes on both sides of US 278, as well
as business properties, that will be impacted. He noted the Stoney Community is 1 of 14
historic designated communities on Hilton Head Island, putting them in a special place, and
his concern is to make sure the interests of this historic neighborhood are being fully
accounted for and there are no alternatives that can be discussed and put in place.
Sherry Sherman, President of the NAACP, commented she was new to the Island and wanted
the Committee to keep in mind that the Gullah Geechee live here and are impacted by the
decisions made by the Committee.
Trey Graves, born and raised on Hilton Head Island, empathized with the Committee over its
complex and difficult decision to be made as to how to solve the traffic congestion problem. He
pointed out that 90% of the people in the room would not be sitting in that traffic in 2045, but
he probably would be. Although the alternative is radical that was proposed decades ago to
put another bridge off the Island, not in the same footprint of the Graves Bridge, but
somewhere at the end of Beach City Road that could connect to St. Helena Island that would
provide 2 entrances and exits onto the Island, act as a great circle to keep traffic moving, and
make it easier for the working people coming from Ridgeland and Hardeeville who sit in 4
pinch points before even reaching the bridge. He acknowledged it would be expensive, would
have to be a toll bridge, take extensive engineering, would affect the beauty of the Island, but
it is not a problem or solution that the majority of the people affected today and making the
decisions today will have to deal with when we are your age.
Mr. Colin addressed Mr. Cliffe's question about the life span of the EA by explaining that
projects that go through the NEPA process, whether it is an EIS or Environmental
Assessment, the information the findings and conclusions are based on has a 3-year life span.
So, that expires, then you have to amend or update the information, or potentially go through
the entire process again. He indicated the end date for EA is the end of June, 2026.
5. New Business
Page 16 of 300
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 11
None.
6. Adjournment
Mayor Perry declared the meeting adjourned at 3:41 PM.
Approved:
The recording of this Meeting can be found on the Town’s website
at www.hiltonheadislandsc.gov
Page 17 of 300
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Willliam Hilton Parkway
Gateway Corridor Advisory Committee
TO: Advisory Committee
FROM: Shawn Colin, Assistant Town Manager
DATE: June 12 2024
SUBJECT: Transmittal of Meeting Materials from the Lochmueller Group
Agenda
RECOMMENDATION:
This memo serves as the transmittal document to cover the materials submitted for
consideration by the Lochmueller Group. This material will be covered at the June 12,
2024 meeting of the William Hilton Parkway Gateway Corridor Advisory Committee.
ATTACHMENTS:
1. The Lochmueller Group Document Transmittal Memo – dated June 10, 2024
2. Independent Study of WHP Corridor – Summary of Submitted Memorandums by
the Lochmueller Group – June 10, 2024
3. WHP Committee Presentation – dated June 12, 2024
4. Technical Memorandum – Downstream Impacts to Task 4 Intersections – dated
June 10, 2024
Page 18 of 300
TRANSMITTAL
To: Shawn Colin, AICP – Town of Hilton Head Island
From: Nate Nohren, PE, PTOE
Date: June 10, 2024
Subject: Copies of Presentation Materials for 6/12/2024 Advisory Committee Meeting
RE: William Hilton Parkway Gateway Corridor Indepen dent Review
Hi Shawn,
Attached please find a PDF copy of the power point slides we will be presenting at the June 12, 2024,
Advisory Committee meeting. The content provided w ithin our presentation can be summarized as
follows:
• Update on Project Progress – we will provide the Committee an update on what our team has
been working on and/or completed since the May 8 Co mmittee meeting. We also provide
current status of percent-of-work completed to date , as well as on-going or upcoming work
subtasks, relative to Tasks 1, 2, 3, and 4 as describe d in the Town approved Scope of Services
Addendum (9/29/2023).
• Presentation of Downstream Impacts to Task 4 Interse ctions (Assuming Implementation of
Modified Alternative 1 from Task 3) – we will present our findings related to the anti cipated
impacts to intersections downstream of Gum Tree Roa d and Cross Island Parkway, assuming the
implementation of the “modified” Alternative #1, whi ch includes the implementation of a single
eastbound left-turn and a single southbound right-t urn lane at Squire Pope Road.
We have also attached a PDF copy of the technical m emorandum we’ve prepared that details our findings
related to the evaluation of downstream impacts to Task 4 intersections, which includes accompanying
data tables and exhibits.
Finally, we have also included a “Summary of Submit ted Memorandums” PDF, which includes all
memorandums that Lochmueller has completed and subm itted to Town staff, as of June 10, 2024.
Please let me know if you have any questions regard ing the information shared above. Otherwise, we
look forward to speaking with you all on June 12.
Sincerely,
Nate Nohren, PE, PTOE
Page 19 of 300
William Hilton Parkway Gateway Corridor
Independent Review Advisory Committee Meeting
June 12
th , 2024
Page 20 of 300
Agenda
Update on Project Progress
Presentation of Downstream Impacts to Task 4 Intersections (Assuming
Implementation of Modified Alternative 1 from Task 3)
Questions
Page 21 of 300
Update on Project Progress
(Key Tasks Completed & Continuing to Work on Since Last Meeting )
Completed evaluations RE: impacts to Task 4 intersections (assuming
implementation of Modified Alternative 1 from Task 3)
Continue traffic analyses and modeling (Synchro/VISSIM ) to determine
proposed mitigation strategies for 2045 Build Year conditions at
intersections downstream of CIP
Page 22 of 300
• Task #1: Project Initiation and Coordination
o ~98% Complete
o Key Subtasks On-Going:
Remaining scheduled meetings with Town staff
Update on Overall Project Progress (as of 6/10/24)
98% 2%
Overall ~75% Complete 75% 25%
Page 23 of 300
Update on Overall Project Progress (as of 6/10/24)
Task #2: Review of Travel Demand Model & Evaluation of
2023 Existing Operating Conditions (Entire Study Area)
o 100% Complete 100%
Page 24 of 300
Update on Overall Project Progress (as of 6/10/24)
• Task #3: Traffic Model and Operational Update – Modified
Original Project Study Area
o ~90% Complete
o Key Subtasks Forthcoming:
Prepare for and present results of Final Summary of Findings Memo RE: Task
#3 Alternatives Analysis to be presented to Town Council (6/17 & 6/18)
90% 10%
Page 25 of 300
Update on Overall Project Progress (as of 6/10/24)
• Task #4: Traffic Model and Operational Update –
Entire Project Study Area
o ~50% Complete
o Key Subtasks On-Going:
Continue traffic analyses and modeling (Synchro/VISSIM ) to determine
proposed mitigation strategies for 2045 Build Year conditions at
intersections downstream of CIP
o Key Subtasks Forthcoming:
Prepare Draft Summary of Findings memo RE: Task 4 analyses (Task 4.4)
Presentation of Task 4 findings to Town Council (date TBD) (Task 4.5)
50% 50%
Page 26 of 300
Update on Overall Project Progress (as of 6/10/24)
• Task #5: Final Report
o Will commence immediately following Task 4
Page 27 of 300
Review Topics
• Independent Study Goals
• Reported Results Include the Following:
o Level of Service (LOS) A - F
o Delay (seconds)
o 95 th Percentile Queue Length (feet)
o Specifies a queue that is typically exceeded only once or twice during the day
o Maximum Queue Length (feet)
o Lane Capacity
Level of Service
Control Delay per Vehicle (sec/veh)
Signalized Unsignalized
A < 10 0-10
B > 10-20 > 10-15
C > 20-35 > 15-25
D > 35-55 > 25-35
E > 55-80 > 35-50
F > 80 > 50
Page 28 of 300
Review Topics
• Traffic Volumes:
• Hourly traffic volumes collected on March 22, 2023 were used for all scenarios
• Corridor studies often reference the 30th highest day for traffic volumes to ensure that the
volumes used in the analysis responsibly reflect peak conditions, while not over- or under-
estimating the traffic volumes.
• Historical traffic data was obtained from SCDOT from the most recent 365 days. Based on the
data, it was determined that March 30, 2023 was the 30th highest day out of the year for traffic
volumes. The counts collected on March 22, 2023 were adjusted to align with the estimated
traffic volumes on March 30, 2023.
• The volumes used in the study were provided during the Committee Meeting on March 27, 2024
as well as in the Corridor Alternatives Analysis Memorandum submitted on May 3, 2024.
Excerpts are provided in the following slides.
• Stress Testing / Sensitivity Analysis
• Per the scope of services, only the 2023 existing conditions and 2045 future year under one
growth rate is to be evaluated. If the recommended improvements hold in 2045, then it is
assumed that they would also work in the years 2025, 2030, 2035, and 2040 as those years
would have lower traffic volumes than 2045.
Page 29 of 300
9
10
11
12
9
AM Peak Hour Volumes PM Peak Hour Volumes
212
0
45 43
1425
2 2
0
5
156
2620
2
US 278
Squire Pope
Rd
11
12
70
127 56
1281
71 121
43
121
43
2481
146
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
20
1394
76
2670 92
179
212 189
775
193 8
144
290
154
1527
6
9
341
2
41 57
2687
2 2
25
2
222
1992
29
US 278
Squire Pope
Rd
11
33
78
62 84
2508
31 259
47
60
51
1869
115
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
64
2736
10
2035 107
183
242 326
1542
195 224
207
277
125
1065
23
2023 Existing Traffic
Volumes
Page 30 of 300
9
10
11
12
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
9
AM Peak Hour Volumes PM Peak Hour Volumes
240
0
51 49
1612
2 2
0
6
176
2963
2
US 278
Squire Pope
Rd
11
14
79
144 63
1449
80 137
49
137
49
2806
165
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
23
1577
86
3020 104
202
240 214
876
218 9
163
328
174
1727
7
9
386
2
46 64
3039
2 2
28
2
251
2253
33
US 278
Squire Pope
Rd
11
37
88
70 95
2837
35 293
53
68
58
2113
130
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
73
3094
11
2301 121
207
274 369
1745
220 253
234
313
141
1204
26
Page 31 of 300
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
• Lochmueller previously analyzed four alternatives intended to improve the
operating conditions along US 278 between Moss Creek Dr and Gumtree Rd.
• After review of the findings and discussion with SCDOT, Lochmueller was
directed by the Town of Hilton Head Island to pursue Alternative 1: SCDOT
Modified Recommended Preferred with modifications to provide a single
eastbound left-turn lane and a single southbound right-turn lane at US 278 at
Squire Pope Rd.
• As a next step, Lochmueller evaluated the impacts the modified Alternative 1
would have on the entire project study area and determined what, if any,
improvements should be made to accommodate the 2045 forecasted traffic.
Page 32 of 300
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Page 33 of 300
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Corridor
2045 No Build Simulated
travel time (secs)
2045 Modified Alternative 1
Simulated Travel Time (secs) % Difference
AM PM AM PM AM PM
Hilton Parkway
between Moss
Creek and Indigo
Run
EB 1579 642 628 631 -60.23% -1.71%
WB 584 1544 597 616 2.23% -60.10%
Hilton Parkway
@Moss Creek to
Cross Island
Parkway @Sea
Pine
SB 1984 873 1387 874 -30.09% 0.11%
NB 823 2465 848 904 3.04% -63.33%
o VISSIM travel time results:
o Under the 2045 No Build scenario, it is expected that it would take approximately 26.3 minutes to travel eastbound
along Hilton Parkway between Moss Creek and Indigo Run during the AM peak hour. It is expected that the travel time
will be reduced to approximately 10.5 minutes under the modified Alternative 1.
o Under the 2045 No Build scenario, it is expected that it would take approximately 25.7 minutes to travel westbound
along Hilton Parkway between Moss Creek and Indigo Run during the PM peak hour. It is expected that the travel time
will be reduced to approximately 10.3 minutes under the modified Alternative 1.
Page 34 of 300
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Video to be inserted
AM
Eastbound on
Hilton Parkway
Page 35 of 300
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Video to be inserted
AM
Southbound on
Cross Island Parkway
Page 36 of 300
Video to be inserted
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
PM
Westbound on
Hilton Parkway
Page 37 of 300
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Video to be inserted
PM
Northbound on
Cross Island Parkway
Page 38 of 300
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection A (8.4) B (11.8)
Eastbound Approach A (7.0) [102] {697} B (11.3) [124] {484}
Westbound Approach A (8.2) [28] {237} A (5.8) [36] {524}
Northbound Approach C (30.4) [<25] {56} E (67.0) [<25] {109}
Southbound Approach C (22.6) [<25] {170} D (51.1) [128] {521}
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach A (4.7) [<25] {56} B (12.5) [<25] {32}
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection B (16.6) C (23.8)
Eastbound Approach B (11.0) [106] {998} C (27.9) [198] {861}
Westbound Approach B (11.2) [56] {248} B (11.9) [84] {779}
Northbound Approach D (48.6) [45] {135} E (65.2) [77] {196}
Southbound Approach E (75.9) [74] {292} E (60.6) [49] {197}
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection
D (37.1) D (43.8)
Eastbound Approach C (33.4) [164] {682} E (57.1) [184] {562}
Westbound Approach D (40.8) [130] {369} D (35.4) [236] {786}
Northbound Approach C (26.6) [61] {264} D (37.3) [98] {327}
Southbound Approach D (50.2) [93] {302} D (52.7) [119] {453}
10
• EB LT expected to fail during AM
peak hour
• SB LT expected to fail during PM
peak hour
• SB RT expected to have queues
of over 500 ft during PM peak
hour
• EB, WB, and SB LT expected to
fail during both peak hours
11
9
• WB LT expected to fail
during AM peak hour
12
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Page 39 of 300
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
13: Jarvis Park Rd/Wilborn Rd & Hilton Pkwy (signal)
Overall Intersection C (26.7) B (18.8)
Eastbound Approach C (25.4) [439] {1480} B (16.3) [103] {735}
Westbound Approach C (21.6) [101] {686} B (18.2) [295] {1202}
Northbound Approach E (68.6) [43] {170} F (87.6) [56] {191}
Southbound Approach D (39.1) [66] {228} B (19.2) [29] {112}
14: Pembroke Dr/Museum St & Hilton Pkwy (signal)
Overall Intersection
C (23.1) C (24.5)
Eastbound Approach B (18.9) [403] {1224} B (17.2) [128] {910}
Westbound Approach C (20.9) [75] {532} C (21.6) [171] {903}
Northbound Approach D (53.1) [71] {257} E (60.1) [92] {299}
Southbound Approach C (30.4) [<25] {89} D (40.3) [<25] {111}
15: Central Ave & Hilton Pkwy (un-signalized)
Eastbound Left Turn A (7.1) [<25] {<25} C (19.3) [<25] {25}
Westbound Left Turn C (24.1) [<25] {26} A (9.5) [<25] {<25}
Northbound Right Turn C (16.5) [<25] {27} B (13.9) [<25] {32}
Southbound Right Turn B (12.5) [<25] {45} C (18.3) [<25] {38}
16: Hatton Pl/Merchant St & Hilton Pkwy (un-signalized)
Northbound Right Turn A (9.5) [<25] {28} A (7.8) [<25] {63}
Southbound Right Turn B (11.3) [<25] {36} C (22.9) [<25] {41}
17: Indigo Run Dr/Whooping Crane Way & Hilton Pkwy (signal)
Overall Intersection C (25.1) D (36.1)
Eastbound Approach C (21.1) [134] {846} C (33.6) [128] {751}
Westbound Approach B (17.3) [53] {359} C (28.0) [207] {887}
Northbound Approach E (56.6) [33] {114} E (66.9) [65] {268}
Southbound Approach D (47.7) [56] {192} E (57.6) [77] {264}
14
15
16
*Highlighted cells indicate that the maximum queues are expected to
extend into the next intersection
• WB LT expected to fail
during AM peak hour
13
• EB LT and NB TH
expected to fail during
PM peak hour
17
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Page 40 of 300
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection
C (29.0) B (19.0)
Eastbound Approach D (36.9) [1380] {1512} B (15.9) [142] {823}
Westbound Approach B (12.9) [39] {249} B (15.8) [85] {539}
Northbound Approach C (26.6) [<25] {105} D (39.5) [65] {263}
Southbound Approach D (35.7) [34] {151} C (25.5) [37] {140}
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn F (1,033.8) [80] {183} F (101.3) [<25] {99}
Westbound Right Turn F (91.9) [109] {217} B (13.3) [35] {134}
Southbound Left Turn C (22.0) [278] {513} B (13.7) [29] {465}
29: Palmetto Bay Rd & Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection F (53.4) F (79.2)
Eastbound Approach F (314.9) [809] {838} F (179.8) [805] {838}
Westbound Approach B (14.0) [56] {420} F (189.7) [1644] {1658}
Northbound Approach A (4.1) [<25] {209} F (52.9) [463] {788}
Southbound Approach C (18.5) [307] {461} A (9.1) [111] {460}
27
28
• Significant queueing along
Palmetto Bay Rd is
anticipated as a result of the
failing roundabout. This
queuing will result in long
delays for WB left-turns at
unsignalized intersections.
29
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Page 41 of 300
Next Steps
• Evaluate potential improvements to mitigate long queues and delays at
intersections downstream of Gumtree Rd and Cross Island Parkway
• Improvements may include:
• Reconfiguring intersections and turn lanes to improve efficiency
• Addition of lanes to improve capacity
• Sea Pines roundabout improvements
Page 42 of 300
QUESTIONS?
https://www.islandpacket.com/news/local/traffic/article235209867.html
Page 43 of 300
APPENDIX
https://www.islandpacket.com/news/local/traffic/article235209867.html
Page 44 of 300
2045 Modified Alternative 1 Results (VISSIM)
No Improvements East of Gumtree Rd
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (17.0) B (17.3)
Eastbound Approach B (19.6) [63] {351} C (20.4) [50] {242}
Westbound Approach B (12.9) [<25] {188} B (16.0) [51] {406}
Northbound Approach B (14.3) [<25] {74} B (14.2) [<25] {52}
Southbound Approach A (6.6) [<25] {57} A (9.6) [<25] {91}
2: Buckingham Plantation Dr/Moss Creek Dr & Hilton Pkwy (signal)
Overall Intersection B (15.8) B (19.7)
Eastbound Approach B (14.6) [59] {389} B (15.2) [51] {313}
Westbound Approach B (15.7) [41] {286} C (21.5) [127] {700}
Northbound Approach B (20.0) [<25] {159} D (37.5) [<25] {104}
Southbound Approach C (22.8) [<25] {84} C (26.3) [<25] {116}
3: Salt Marsh Dr/Moss Creek Village & Hilton Pkwy (un-signalized)
Eastbound Left Turn A (8.0) [<25] {<25} C (17.1) [<25] {50}
Westbound Left Turn A (8.7) [<25] {<25} A (8.3) [<25] {46}
Northbound Approach B (11.3) [<25] {65} B (10.7) [<25] {66}
Southbound Approach A (8.6) [<25] {79} B (10.5) [<25] {80}
4: Fording Island Rd Ext & Hilton Pkwy (un-signalized)
Westbound Left Turn C (16.7) [<25] {<25} C (15.6) [<25] {32}
Northbound Approach B (13.3) [<25] {37} B (12.1) [<25] {43}
1
2
4
3
Page 45 of 300
2045 Modified Alternative 1 Results (VISSIM)
No Improvements East of Gumtree Rd
Jenkins Rd
5
7
Crosstree Dr
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
5: Boat Landing Driveway/Wildlife Refuge Driveway & Hilton Pkwy (un-signalized)
Northbound Right-Turn A (7.7) [<25] {<25} A (6.4) [<25] {<25}
Southbound Right-Turn No volumes observed C (16.2) [<25] {25}
6: Blue Heron Point Rd & Hilton Pkwy (un-signalized)
Intersection combined with Crosstree Dr
7: Crosstree Dr (Windmill Harbour) & Hilton Pkwy (signal)
Overall Intersection A (9.5) A (7.3)
Eastbound Approach A (8.9) [80] {818} A (9.2) [58] {581}
Westbound Approach A (8.6) [36] {330} A (3.3) [31] {188}
Northbound Approach D (42.5) [<25] {124} E (58.1) [61] {244}
Southbound Approach D (50.9) [<25] {92} D (44.9) [<25] {101}
8: Jenkins Rd & Hilton Pkwy (un-signalized)
Intersection combined with Crosstree Dr
Page 46 of 300
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection A (8.4) B (11.8)
Eastbound Approach A (7.0) [102] {697} B (11.3) [124] {484}
Westbound Approach A (8.2) [28] {237} A (5.8) [36] {524}
Northbound Approach C (30.4) [<25] {56} E (67.0) [<25] {109}
Southbound Approach C (22.6) [<25] {170} D (51.1) [128] {521}
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach A (4.7) [<25] {56} B (12.5) [<25] {32}
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection B (16.6) C (23.8)
Eastbound Approach B (11.0) [106] {998} C (27.9) [198] {861}
Westbound Approach B (11.2) [56] {248} B (11.9) [84] {779}
Northbound Approach D (48.6) [45] {135} E (65.2) [77] {196}
Southbound Approach E (75.9) [74] {292} E (60.6) [49] {197}
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection
D (37.1) D (43.8)
Eastbound Approach C (33.4) [164] {682} E (57.1) [184] {562}
Westbound Approach D (40.8) [130] {369} D (35.4) [236] {786}
Northbound Approach C (26.6) [61] {264} D (37.3) [98] {327}
Southbound Approach D (50.2) [93] {302} D (52.7) [119] {453}
10
11
9
12
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Page 47 of 300
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
13: Jarvis Park Rd/Wilborn Rd & Hilton Pkwy (signal)
Overall Intersection C (26.7) B (18.8)
Eastbound Approach C (25.4) [439] {1480} B (16.3) [103] {735}
Westbound Approach C (21.6) [101] {686} B (18.2) [295] {1202}
Northbound Approach E (68.6) [43] {170} F (87.6) [56] {191}
Southbound Approach D (39.1) [66] {228} B (19.2) [29] {112}
14: Pembroke Dr/Museum St & Hilton Pkwy (signal)
Overall Intersection
C (23.1) C (24.5)
Eastbound Approach B (18.9) [403] {1224} B (17.2) [128] {910}
Westbound Approach C (20.9) [75] {532} C (21.6) [171] {903}
Northbound Approach D (53.1) [71] {257} E (60.1) [92] {299}
Southbound Approach C (30.4) [<25] {89} D (40.3) [<25] {111}
15: Central Ave & Hilton Pkwy (un-signalized)
Eastbound Left Turn A (7.1) [<25] {<25} C (19.3) [<25] {25}
Westbound Left Turn C (24.1) [<25] {26} A (9.5) [<25] {<25}
Northbound Right Turn C (16.5) [<25] {27} B (13.9) [<25] {32}
Southbound Right Turn B (12.5) [<25] {45} C (18.3) [<25] {38}
16: Hatton Pl/Merchant St & Hilton Pkwy (un-signalized)
Northbound Right Turn A (9.5) [<25] {28} A (7.8) [<25] {63}
Southbound Right Turn B (11.3) [<25] {36} C (22.9) [<25] {41}
17: Indigo Run Dr/Whooping Crane Way & Hilton Pkwy (signal)
Overall Intersection C (25.1) D (36.1)
Eastbound Approach C (21.1) [134] {846} C (33.6) [128] {751}
Westbound Approach B (17.3) [53] {359} C (28.0) [207] {887}
Northbound Approach E (56.6) [33] {114} E (66.9) [65] {268}
Southbound Approach D (47.7) [56] {192} E (57.6) [77] {264}
14
15
16
13 17
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Page 48 of 300
2045 Modified Alternative 1 Results (VISSIM)
No Improvements East of Gumtree Rd
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un-signalized)
Eastbound Approach B (11.4) [<25] {45} B (10.9) [<25] {69}
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (4.5) [<25] {63} A (2.4) [<25] {70}
Southbound Left Turn A (6.1) [<25] {85} A (8.7) [<25] {127}
Southbound Right Turn A (9.0) [<25] {51} B (12.2) [<25] {94}
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (1.6) [<25] {49} A (1.5) [<25] {<25}
Northbound Left Turn B (12.1) [<25] {76} D (27.7) [44] {227}
Northbound Right Turn A (6.1) [<25] {101} A (7.5) [61] {252}
18
Honey Horn Rd
19
20
Page 49 of 300
2045 Modified Alternative 1 Results (VISSIM)
No Improvements East of Gumtree Rd
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed E (47.6) [<25] {40}
Eastbound Right Turn D (29.7) [<25] {41} C (17.8) [<25] {38}
Northbound Left Turn F (91.9) [<25] {60} A (8.1) [<25] {26}
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection C (33.0) B (19.9)
Eastbound Approach E (63.8) [98] {338} C (30.6) [40] {184}
Westbound Approach C (21.9) [26] {112} C (28.0) [79] {328}
Northbound Approach B (16.9) [50] {314} B (16.6) [99] {607}
Southbound Approach D (36.4) [840] {1658} B (19.2) [120] {745}
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach F (303.0) [78] {175} D (25.2) [<25] {54}
Southbound Left Turn C (19.7) [494] {946} B (13.6) [<25] {26}
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach F (163.9) [109] {214} C (17.9) [<25] {59}
Southbound Left Turn B (10.5) [233] {419} A (9.9) [<25] {<25}
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn F (207.8) [89] {174} E (45.5) [<25] {40}
Westbound Right Turn F (70.2) [118] {207} B (13.0) [<25] {74}
Southbound Left Turn D (30.8) [1399] {1658} B (14.3) [<25] {28}
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn F (2,462.0) [73] {88} E (35.5) [<25] {39}
Westbound Right Turn B (13.2) [109] {125} B (12.9) [<25] {76}
Southbound Left Turn C (22.2) [380] {493} B (11.6) [<25] {28}
22
23
24
25
26
21
Bay Pines Rd
Page 50 of 300
Intersection & Movements LOS (Delay, sec) [95 th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection
C (29.0) B (19.0)
Eastbound Approach D (36.9) [1380] {1512} B (15.9) [142] {823}
Westbound Approach B (12.9) [39] {249} B (15.8) [85] {539}
Northbound Approach C (26.6) [<25] {105} D (39.5) [65] {263}
Southbound Approach D (35.7) [34] {151} C (25.5) [37] {140}
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn F (1,033.8) [80] {183} F (101.3) [<25] {99}
Westbound Right Turn F (91.9) [109] {217} B (13.3) [35] {134}
Southbound Left Turn C (22.0) [278] {513} B (13.7) [29] {465}
29: Palmetto Bay Rd & Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection F (53.4) F (79.2)
Eastbound Approach F (314.9) [809] {838} F (179.8) [805] {838}
Westbound Approach B (14.0) [56] {420} F (189.7) [1644] {1658}
Northbound Approach A (4.1) [<25] {209} F (52.9) [463] {788}
Southbound Approach C (18.5) [307] {461} A (9.1) [111] {460}
27
28
29
Downstream Impacts to Task 4 Intersections
(Assuming Implementation of Modified Alternative 1)
Page 51 of 300
MEMO
Huntington Tower, 201 W Springfield Avenue, Suite 1012
Champaign, Illinois 61820
PHONE: 217.673.7633
To: Town of Hilton Head, South Carolina
From: Lochmueller Group
Date: June 10, 2024
Subject: Independent Study of the William Hilton Parkway Gateway Corridor
Downstream Impacts to Task 4 Intersections Memorandum – Task 4.4
Lochmueller Group (Lochmueller) has prepared the following memorandum pertaining to the
Independent Study of the William Hilton Pkwy Gateway Corridor. Lochmueller previously submitted a
Technical Memorandum dated May 3, 2024, which summarized four alternatives intended to improve the
operating conditions along US 278 between Moss Creek Dr and Gumtree Rd. After review of the findings
and discussion with SCDOT, Lochmueller was directed by the Town of Hilton Head Island to pursue
Alternative 1: SCDOT Modified Recommended Preferred with modifications to provide a single eastbound
left-turn lane and a single southbound right-turn lane at US 278 at Squire Pope Rd. As a next step,
Lochmueller evaluated the impacts Alternative 1 would have on the entire project study area and
determined what, if any, improvements should be made to accommodate the 2045 forecasted traffic at
the intersections downstream of Gumtree Rd.
The intention of this memorandum is to provide the Town of Hilton Head with the findings related to
traffic impacts that would be seen within the entire project area which includes US 278 from Moss Creek
Drive to Indigo Run Drive, as well as US 278 (Palmetto Bay Road) from Cross Island Pkwy to Sea Pines
Circle, assuming Alternative 1: SCDOT Modified Recommended Preferred with modifications is
implemented. For the purposes of this memorandum, no additional physical improvements were
modeled for intersections downstream of Gumtree Rd or Cross Island Parkway; however, those
improvements were modeled as part of Lochmueller’s next deliverable. Figure 1 shows the entire project
area which was used for the analysis.
Page 52 of 300
June 10, 2024
Page 2
FIGURE 1. ENTIRE PROJECT STUDY AREA
Downstream Impacts
As previously stated, the Town of Hilton Head Island directed Lochmueller to proceed with Alternative 1:
SCDOT Modified Recommended Preferred with modifications to provide a single eastbound left-turn lane
and a single southbound right-turn lane at US 278 at Squire Pope Rd. As such, Lochmueller was tasked to
evaluate the impacts of the Modified Alternative 1 on the intersections downstream of Gumtree Rd and
Cross Island Parkway.
It should be noted that the results shown in this memorandum include the adaptive signals as well as the
previously recommended improvements at Gumtree Rd. The improvements at Gumtree Rd include
keeping the intersections at-grade; completely reconfiguring the intersection to improve its efficiency;
and providing dual left-turn lanes for the westbound, northbound, and southbound approaches. Figure 2
displays SCDOT's recommended improvements for Alternative 1, excluding Gumtree Rd upgrades.
Page 53 of 300
June 10, 2024
Page 3
FIGURE 2. ALTERNATIVE 1: SCDOT MODIFIED RECOMMENDED PREFERRED
Page 54 of 300
June 10, 2024
Page 4
Modified Alternative 1 Traffic Analysis
The travel time calculations and traffic volumes between the 2045 No Build conditions and the 2045
Modified Alternative 1 conditions were evaluated using VISSIM which provides microsimulation travel
time results along corridors. The traffic volumes used for the 2045 Modified Alternative 1 analysis are the
same traffic volumes provided in the Technical Memorandum dated May 3, 2024.
As shown in Table 1, under the 2045 No Build scenario, it is expected that it would take approximately
26.3 minutes to travel eastbound along Hilton Parkway between Moss Creek and Indigo Run during the
AM peak hour. It is expected that the travel time will be reduced to approximately 10.5 minutes under the
Modified Alternative 1. Under the 2045 No Build scenario, it is expected that it would take approximately
25.7 minutes to travel westbound along Hilton Parkway between Moss Creek and Indigo Run during the
PM peak hour. It is expected that the travel time will be reduced to approximately 10.3 minutes under the
Modified Alternative 1.
TABLE 1. 2045 VISSIM TRAVEL TIME RESULTS
Corridor
2045 No Build
Simulated travel
time (secs)
2045 Modified
Alternative 1
Simulated travel
time (secs)
% Difference
AM PM AM PM AM PM
William Hilton Pkwy between
Moss Creek and Indigo Run
EB 1579 642 628 631 -60.23% -1.71%
WB 584 1544 597 616 2.23% -60.10%
William Hilton Pkwy @Moss
Creek to Cross Island Pkwy @Sea
Pine
SB 1984 873 1387 874 -30.09% 0.11%
NB 823 2465 848 904 3.04% -63.33%
The 2045 Modified Alternative 1 operating conditions at the study intersections were evaluated using
VISSIM, which is a microsimulation tool that replicates individual vehicles and their interactions within
complex traffic streams, such as interchanges, freeways, and expressway corridors with signalized
intersections. Intersection performance or traffic operations are quantified by six Levels of Service (LOS),
which range from LOS A ("Free Flow”) to LOS F ("Fully Saturated"). LOS D is considered acceptable for
peak period conditions in urban and suburban areas. However, at side-street stop-controlled
intersections, a LOS E or even a LOS F is a common occurrence for peak period conditions in urban and
suburban areas as it is typical for delays to be longer for vehicles along the side -street as they wait to find
acceptable gaps in the traffic to turn left into the traffic stream.
Levels of service for intersections are determined based on the average d elay experienced by motorists.
Signalized intersections reflect higher delay tolerances as compared to unsignalized and roundabout
locations because motorists are accustomed to and accepting of longer delays at signals. For signalized
and all-way stop intersections, the average control delay per vehicle is estimated for each movement and
then aggregated for each approach and the intersection as a whole. For intersections with partial ( side-
street) stop control, the delay is calculated for the minor movements only (side -street approaches and
major road left-turns) since thru traffic on the major road is not required to stop.
Page 55 of 300
June 10, 2024
Page 5
Table 2 summarizes the criterion for both signalized and unsignalized inte rsections, as defined by the
Highway Capacity Manual (HCM) 6th Edition, last updated in 2016 by the Transportation Research Board.
TABLE 2. INTERSECTION LEVEL OF SERVICE THRESHOLDS
Level of Service
Control Delay per Vehicle (sec/veh)
Signalized Unsignalized/Roundabout
A < 10 0-10
B > 10-20 > 10-15
C > 20-35 > 15-25
D > 35-55 > 25-35
E > 55-80 > 35-50
F > 80 > 50
The 2045 Modified Alternative 1 operating conditions are provided in Table 3. As shown, with the
improvements proposed under the Modified Alternative 1, the study intersections are largely expected to
operate favorably in the year 2045, with some exceptions. The eastbound and westbound through
movements along US 278 are expected to operate with an overall LOS D or better between Moss Creek Dr
and Gumtree Rd. While some of the side-street approaches at unsignalized intersections are still expected
to experience failing conditions, the operations overall are significantly improved from the 2045 No Build
scenario as vehicles can better complete their turning movement due to the reduction in congestion
along the eastbound and westbound mainline.
The intersections downstream of Gumtree Rd are largely expected to operate favorably in 2045 with no
improvements in place. However, long eastbound queues extending from Pembroke Dr through Gumtree
Rd are expected during the AM peak hour. Similarly, the westbound queue at Jarvis Park Rd/Wilborn Rd is
expected to extend back to Pembroke Dr during the PM peak hour. Furthermore, the mainline is expected
to be over capacity in the year 2045. However, overall, the intersections are expected to operate
acceptably with an overall LOS D or better during both peak periods.
As shown, the northbound approach at Jarvis Park Rd/Wilborn Rd is expected to have a failing LOS during
the PM peak hour. It should be noted that this approach has minimal traffic volumes and the maximum
queue expected is only approximately 200 ft. The eastbound left-turn movement at Indigo Run Dr is also
expected to fail during the PM peak hour. The maximum queue length is expected to be approximately
335 ft, which would be contained within the existing turn lane.
Along Palmetto Bay Rd, the roundabout at Sea Pines is expected to fail during both AM and PM peak
hours. The failing conditions result in long queue lengths. The southbound queue is expected to extend
past the study intersection at Target Rd and towards Point Comfort Rd during the AM peak hour. This
results in failing movements for the westbound left-turns out of the unsignalized intersections along
Palmetto Bay Rd as vehicles are unable to find a gap in the traffic to complete thei r turning movement.
During the PM peak hour, nearly every approach of Sea Pines Circle is expected to fail in 2045 with no
improvements in place as the roundabout is unable to accommodate the expected traffic volumes.
Page 56 of 300
June 10, 2024
Page 6
TABLE 3. 2045 MODIFIED ALTERNATIVE 1 OPERATING CONDITIONS (VISSIM)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (17.0) B (17.3)
Eastbound Approach B (19.6) [63] {351} C (20.4) [50] {242}
Westbound Approach B (12.9) [<25] {188} B (16.0) [51] {406}
Northbound Approach B (14.3) [<25] {74} B (14.2) [<25] {52}
Southbound Approach A (6.6) [<25] {57} A (9.6) [<25] {91}
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection B (15.8) B (19.7)
Eastbound Approach B (14.6) [59] {389} B (15.2) [51] {313}
Westbound Approach B (15.7) [41] {286} C (21.5) [127] {700}
Northbound Approach B (20.0) [<25] {159} D (37.5) [<25] {104}
Southbound Approach C (22.8) [<25] {84} C (26.3) [<25] {116}
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (un-signalized)
Eastbound Left Turn A (8.0) [<25] {<25} C (17.1) [<25] {50}
Westbound Left Turn A (8.7) [<25] {<25} A (8.3) [<25] {46}
Northbound Approach B (11.3) [<25] {65} B (10.7) [<25] {66}
Southbound Approach A (8.6) [<25] {79} B (10.5) [<25] {80}
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn C (16.7) [<25] {<25} C (15.6) [<25] {32}
Northbound Approach B (13.3) [<25] {37} B (12.1) [<25] {43}
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Northbound Right-Turn A (7.7) [<25] {<25} A (6.4) [<25] {<25}
Southbound Right-Turn No volumes observed C (16.2) [<25] {25}
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Intersection combined with Crosstree Dr
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection A (9.5) A (7.3)
Eastbound Approach A (8.9) [80] {818} A (9.2) [58] {581}
Westbound Approach A (8.6) [36] {330} A (3.3) [31] {188}
Northbound Approach D (42.5) [<25] {124} E (58.1) [61] {244}
Southbound Approach D (50.9) [<25] {92} D (44.9) [<25] {101}
Page 57 of 300
June 10, 2024
Page 7
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Intersection combined with Crosstree Dr
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection A (8.4) B (11.8)
Eastbound Approach A (7.0) [102] {697} B (11.3) [124] {484}
Westbound Approach A (8.2) [28] {237} A (5.8) [36] {524}
Northbound Approach C (30.4) [<25] {56} E (67.0) [<25] {109}
Southbound Approach C (22.6) [<25] {170} D (51.1) [128] {521}
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach A (4.7) [<25] {56} B (12.5) [<25] {32}
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection B (16.6) C (23.8)
Eastbound Approach B (11.0) [106] {998} C (27.9) [198] {861}
Westbound Approach B (11.2) [56] {248} B (11.9) [84] {779}
Northbound Approach D (48.6) [45] {135} E (65.2) [77] {196}
Southbound Approach E (75.9) [74] {292} E (60.6) [49] {197}
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (37.1) D (43.8)
Eastbound Approach C (33.4) [164] {682} E (57.1) [184] {562}
Westbound Approach D (40.8) [130] {369} D (35.4) [236] {786}
Northbound Approach C (26.6) [61] {264} D (37.3) [98] {327}
Southbound Approach D (50.2) [93] {302} D (52.7) [119] {453}
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (26.7) B (18.8)
Eastbound Approach C (25.4) [439] {1480} B (16.3) [103] {735}
Westbound Approach C (21.6) [101] {686} B (18.2) [295] {1202}
Northbound Approach E (68.6) [43] {170} F (87.6) [56] {191}
Southbound Approach D (39.1) [66] {228} B (19.2) [29] {112}
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection C (23.1) C (24.5)
Eastbound Approach B (18.9) [403] {1224} B (17.2) [128] {910}
Westbound Approach C (20.9) [75] {532} C (21.6) [171] {903}
Northbound Approach D (53.1) [71] {257} E (60.1) [92] {299}
Southbound Approach C (30.4) [<25] {89} D (40.3) [<25] {111}
Page 58 of 300
June 10, 2024
Page 8
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn A (7.1) [<25] {<25} C (19.3) [<25] {25}
Westbound Left Turn C (24.1) [<25] {26} A (9.5) [<25] {<25}
Northbound Right Turn C (16.5) [<25] {27} B (13.9) [<25] {32}
Southbound Right Turn B (12.5) [<25] {45} C (18.3) [<25] {38}
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn A (9.5) [<25] {28} A (7.8) [<25] {63}
Southbound Right Turn B (11.3) [<25] {36} C (22.9) [<25] {41}
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection C (25.1) D (36.1)
Eastbound Approach C (21.1) [134] {846} C (33.6) [128] {751}
Westbound Approach B (17.3) [53] {359} C (28.0) [207] {887}
Northbound Approach E (56.6) [33] {114} E (66.9) [65] {268}
Southbound Approach D (47.7) [56] {192} E (57.6) [77] {264}
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un-signalized)
Eastbound Approach B (11.4) [<25] {45} B (10.9) [<25] {69}
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (4.5) [<25] {63} A (2.4) [<25] {70}
Southbound Left Turn A (6.1) [<25] {85} A (8.7) [<25] {127}
Southbound Right Turn A (9.0) [<25] {51} B (12.2) [<25] {94}
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (1.6) [<25] {49} A (1.5) [<25] {<25}
Northbound Left Turn B (12.1) [<25] {76} D (27.7) [44] {227}
Northbound Right Turn A (6.1) [<25] {101} A (7.5) [61] {252}
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed E (47.6) [<25] {40}
Eastbound Right Turn D (29.7) [<25] {41} C (17.8) [<25] {38}
Northbound Left Turn F (91.9) [<25] {60} A (8.1) [<25] {26}
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection C (33.0) B (19.9)
Eastbound Approach E (63.8) [98] {338} C (30.6) [40] {184}
Westbound Approach C (21.9) [26] {112} C (28.0) [79] {328}
Northbound Approach B (16.9) [50] {314} B (16.6) [99] {607}
Southbound Approach D (36.4) [840] {1658} B (19.2) [120] {745}
Page 59 of 300
June 10, 2024
Page 9
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach F (303.0) [78] {175} D (25.2) [<25] {54}
Southbound Left Turn C (19.7) [494] {946} B (13.6) [<25] {26}
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach F (163.9) [109] {214} C (17.9) [<25] {59}
Southbound Left Turn B (10.5) [233] {419} A (9.9) [<25] {<25}
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn F (207.8) [89] {174} E (45.5) [<25] {40}
Westbound Right Turn F (70.2) [118] {207} B (13.0) [<25] {74}
Southbound Left Turn D (30.8) [1399] {1658} B (14.3) [<25] {28}
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn F (2,462.0) [73] {88} E (35.5) [<25] {39}
Westbound Right Turn B (13.2) [109] {125} B (12.9) [<25] {76}
Southbound Left Turn C (22.2) [380] {493} B (11.6) [<25] {28}
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection C (29.0) B (19.0)
Eastbound Approach D (36.9) [1380] {1512} B (15.9) [142] {823}
Westbound Approach B (12.9) [39] {249} B (15.8) [85] {539}
Northbound Approach C (26.6) [<25] {105} D (39.5) [65] {263}
Southbound Approach D (35.7) [34] {151} C (25.5) [37] {140}
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn F (1,033.8) [80] {183} F (101.3) [<25] {99}
Westbound Right Turn F (91.9) [109] {217} B (13.3) [35] {134}
Southbound Left Turn C (22.0) [278] {513} B (13.7) [29] {465}
29: Palmetto Bay Rd & William Hilton Pkwy (Sea Pines Circle, Roundabout)
Overall Intersection F (53.4) F (79.2)
Eastbound Approach F (314.9) [809] {838} F (179.8) [805] {838}
Westbound Approach B (14.0) [56] {420} F (189.7) [1644] {1658}
Northbound Approach A (4.1) [<25] {209} F (52.9) [463] {788}
Southbound Approach C (18.5) [307] {461} A (9.1) [111] {460}
Page 60 of 300
June 10, 2024
Page 10
Conclusions
Lochmueller Group evaluated the downstream impacts of the 2045 Modified Alternative 1 conditions with
modifications to provide a single eastbound left-turn lane and a single southbound right-turn lane at US
278 at Squire Pope Rd. The analysis included in this memorandum did not assume any physical, nor signal
timing improvements to the intersections downstream of Gumtree Rd or Cross Island Parkway.
With the improvements proposed under the Modified Alternative 1, the downstream study intersections
are largely expected to operate acceptably in the year 2045. However, the eastbound and westbound
approaches between Jarvis Park Rd and Pembroke Dr are expected to experience long queues and be over
capacity in the year 2045, and the existing roundabout at Palmetto Bay Rd and Sea Pines Circle is
expected to fail during both the AM and PM peak hours. As a result of the failing roundabout, the queue
lengths are expected to extend beyond nearby intersections.
As a next step, Lochmueller will evaluate potential improvements to the intersections downstream of
Gumtree Rd and Cross Island Parkway to help mitigate the long queues and delays presented in this
memorandum.
Page 61 of 300
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Willliam Hilton Parkway
Gateway Corridor Advisory Committee
TO: Advisory Committee
FROM: Shawn Colin, Assistant Town Manager
DATE: June 12 2024
SUBJECT: Consideration of a Resolution to Accept the Findings William Hilton
Parkway Gateway Corridor Independent End-to-End Analysis
RECOMMENDATION:
Consideration of a Resolution to Accept the Findings William Hilton Parkway Gateway
Corridor Independent End-to-End Analysis.
BACKGROUND:
On February 21, 2023, the Town Council of the Town of Hilton Head Island adopted a
Resolution authorizing the creation and appointment of a William Hilton Parkway Gateway
Corridor Independent Review Advisory Committee (Committee), as outlined in Exhibit A.
On May 12, 2023, the Committee unanimously recommended a Scope of Work, as
outlined in Exhibit B, be included in a Request for Qualifications to be considered by Town
Council to procure the services of an Engineering consultant to perform the William Hilton
Parkway Gateway Corridor Independent End-to-End Analysis.
On June 6, 2023, Town Council unanimously adopted a Resolution Approving the William
Hilton Parkway Gateway Corridor Independent End- to-End Analysis Request for
Qualifications and Scope of Work.
On August 28, 2023, the Committee unanimously recommended the Town award a
contract with The Lochmueller Group, Inc. to perform the William Hilton Parkway Gateway
Corridor Independent End-to-End Analysis.
On October 12, 2023, the Town of Hilton Head Island executed a contract with the
Consultant to perform William Hilton Parkway Gateway Corridor Independent End-to-End
Analysis.
The Committee held 10 public meetings between November 3, 2023 and June 12, 2024
to review Consultant findings and recommendations for the William Hilton Parkway
Gateway Corridor Independent End-to-End Analysis, as well as receive public input.
Page 62 of 300
Page 2 of 2
As of June 12, 2024, the Consultant had delivered and presented technical reports and
deliverables as outlined in the contracted Scope of Work to the Committee.
The Consultant has substantially completed the work of the Independent William Hilton
Parkway Gateway Corridor Independent End-to-End Analysis and has conveyed findings
to the Committee (Exh ibit C) and should consider acceptance of these findings at this
time.
ATTACHMENTS:
Proposed Resolution
Exhibit A – Resolution to Create Committee
Exhibit B – Scope of Work for Independent End to End Analysis
Exhibit C – Summary of Findings – Technical Memorandums
Page 63 of 300
TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA
RESOLUTION NO. _________________
A RESOLUTION OF THE WILLIAM HILTON PARKWAY GATEWAY CORRIDOR
INDEPENDENT REVIEW ADVISORY COMMITTEE OF THE TOWN OF HILTON
HEAD ISLAND, SOUTH CAROLINA, ACCEPTING THE FINDINGS OF THE
WILLIAM HILTON PARKWAY GATEWAY CORRIDOR INDEPENDENT END TO
END ANALYSIS.
WHEREAS, on February 21, 2023, the Town Council of the Town of Hilton Head Island
adopted a Resolution authorizing the creation and appointment of a William Hilton Parkway
Gateway Corridor Independent Review Advisory Committee, hereinafter called the “Committee”,
as outlined in Exhibit A; and,
WHEREAS, on May 12, 2023, the Committee unanimously recommended a S cope of
Work, as outlined in Exhibit B, be included in a Request for Qualifications to be considered by
Town Council to procure the services of an Engineering consultant to perform the William Hilton
Parkway Gateway Corridor Independent End-to-End Analysis; and
WHEREAS, on June 6, 2023, Town Council unanimously adopted a R esolution
Approving the William Hilton Parkway Gateway Corridor Independent End- to-End Analysis
Request for Qualifications and Scope of Work; and,
WHEREAS, on August 28, 2023, the Committee unanimously recommended the Town
award a contract with The Lochmueller Group, Inc. hereinafter called “Consultant” to perform the
William Hilton Parkway Gateway Corridor Independent End-to-End Analysis; and,
WHEREAS, on October 12, 2023, the Town of Hilton Head Island executed a contract
with the Consultant to perform William Hilton Parkway Gateway Corridor Independent End -to-
End Analysis; and,
WHEREAS, the Committee held 10 public meetings between November 3, 2023 and June
12, 2024 to review Consultant findings and recommendations for the William Hilton Parkway
Gateway Corridor Independent End-to-End Analysis, as well as receive public input; and
WHEREAS, as of June 12, 2024, the Consultant had delivered and presented technical
reports and deliverables as outlined in the contracted Scope of Work to the Committee.
NOW, THEREFORE, BE IT, AND HEREBY IT IS, RESOLVED BY THE
WILLIAM HILTON PARKWAY GATEWAY CORRIDOR INDEPENDENT REVIEW
ADVISORY COMMITTEE FOR THE TOWN OF HILTON HEAD ISLAND, SOUTH
CAROLINA AS FOLLOWS:
Page 64 of 300
(1) The Town Council should consider a Resolution to accept the findings of the William
Hilton Parkway Gateway Corridor Independent End- to-End Analysis delivered by the
Consultant.
(2) The Town Manager is hereby authorized to use the William Hilton Parkway Gateway
Corridor Independent End-to-End Analysis for future planning purposes.
MOVED, APPROVED, AND ACCEPTED BY THE WILLIAM HILTON
PARKWAY GATEWAY CORRIDOR INDEPENDENT REVIEW ADVISORY
COMMITTEE FOR THE TOWN OF HILTON HEAD ISLAND ON THIS _____ DAY OF
_____________, 2024.
THE TOWN OF HILTON HEAD ISLAND,
SOUTH CAROLINA
____________________________
Alan Perry, Mayor
ATTEST:
______________________________________
Kimberly Gammon, Town Clerk
APPROVED AS TO FORM:
__________________________________
Curtis L. Coltrane, Town Attorney
Introduced by Committee Member: ____________________________
Page 65 of 300
EXHIBIT A
Page 66 of 300
Page 67 of 300
Page 68 of 300
Page 69 of 300
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWNOF HILTONHEAD ISLAND
Town Council
TO: Town Council
FROM: Shawn Colin, Assistant Town Manager – Community Development
CC: Marc Orlando, Town Manager
CC: Josh Gruber, Deputy Town Manager
DATE: February 12, 2023
SUBJECT: Consideration of a Resolution authorizing the creation and
appointment of a William Hilton Parkway Gateway Corridor
Independent Review Advisory Committee
RECOMMENDATION:
That Town Council consider a Resolution authorizing the creation and appointment of a
William Hilton Parkway Gateway Corridor Independent Review Advisory Committee.
BACKGROUND:
This project began in 2017 when a need was identified by the South Carolina
Department of Transportation (SCDOT) to improve the westbound bridge that connects
the mainland to the island (there are two bridges in each direction). The Town and
County requested a more comprehensive approach instead of piecemealing an
improvement over a series of years. Since that time, the SCDOT has involved time and
funding to conduct an evaluation of alternatives and prepared a draft Preferred
Recommendation following the NEPA process. There has been ample public
involvement, with many workshops, well over 20 public meetings, and opportunities to
provide comment. In addition, the Town has worked with MKSK, a planning and design
consultant, since April 2021 to review the project and draft recommendations to improve
the corridor alignment and design elements. Town Council approved 26
recommendations on October 12, 2021.
This is a major investment by the SCDOT and Federal Highway Administration (FHWA).
It will have a significant impact on parts of Beaufort County, the Town of Bluffton and
especially the Town of Hilton Head Island. The approach to Hilton Head Island is
viewed as a visual oasis welcoming everyone to the beauty of the island. Changes that
would negatively impact this entry are a major concern to the residents and visitors who
come to Hilton Head. As such, the Town and many of its residents, want to make
certain that all reasonable alternatives have been evaluated before a final decision is
made.
Page 70 of 300
Page 2 of 3
On October 4, 2022 the Town approved an Memorandum of Agreement (MOA) with
Beaufort County (Exhibit A). The MOA outlined a critical path and steps to take to reach
a point for municipal consent consideration. One key step was the procurement of an
Independent Consultant by a selection team consisting of Town and County
representatives to execute the Scope of Work included in the MOA. Input from SCDOT
Secretary Christy Hall and Senator Tom Davis, guided the final language for the RFQ
which did not support the evaluation of additional alternatives for the corridor alignment,
as in their opinion, the addition of this element as part of the Scope of Work to be
executed by the Independent Consultant, could put the grant funding authorized by the
State Infrastructure back in jeopardy.
Town approval of the MOA did not provide municipal consent, nor did it preclude the
submission of amended documents to the Federal Highway Administration to include
recommendations that emerge from the Independent Review.
The County issued a Request for Qualifications (RFQ) (Exhibit B) for an independent
consultant (the “Independent Consultant”), (i.e. – one that does not have a previous or
current contractual relationship with SCDOT, the County, or the Town) to perform an
independent review of the project. One submission was received and reviewed by the
appointed selection team which deemed it responsive, and the firm qualified to perform
the requested work.
However, the Town of Hilton Head wants to hire an independent specialist to review the
information and make sure the recommendations will be in the best interests of all the
players, including residents, employees, visitors, businesses, and the Gullah Cultural
Community which is traversed by William Hilton Parkway. Therefore, a Town RFQ
Exhibit C) has been drafted to complete work consistent with the Scope of Work
agreed to in the MOA.
In addition, Town Council requested that a William Hilton Parkway Gateway Corridor
Independent Review Advisory Committee be created to guide work to complete the
Independent Review. A Resolution (Exhibit D) to create the requested Committee
outlines the membership to include:
a. Member of Town Council
b. Engineer
c. Stoney Citizen Member
d. Community Member
e. Community Member
SUMMARY:
Adoption of the Resolution will authorize the creation of an Advisory Committee to guide
work for the Independent Review. Staff will continue its execution of the approved MOA
with Beaufort County, including work that needs to be completed to provide better
understanding of project details and impacts needed to inform recommendations for
improvements to the bridge, corridor, and project mitigation.
Page 71 of 300
Page 3 of 3
ATTACHMENTS:
1. Exhibit A - MOA approved by Town of Hilton Head Island and Beaufort County
Councils
2. Exhibit B - RFQ Issued by Beaufort County for Independent Consultant Review
3. Exhibit C - Draft RFQ to be issued by the Town for Independent Consultant
Review
4. Exhibit D - Resolution authorizing the creation and appointment of a William
Hilton Parkway Gateway Corridor Independent Review Advisory Committee
Page 72 of 300
Page 73 of 300
Page 74 of 300
Page 75 of 300
Page 76 of 300
Page 77 of 300
Page 78 of 300
Page 79 of 300
Page 80 of 300
Page 81 of 300
Page 82 of 300
Page 83 of 300
Page 84 of 300
Page 85 of 300
Page 86 of 300
REQUESTFORQUALIFICATIONS
WILLIAM HILTON PARKWAY/US278CORRIDOR
INDEPENDENTREVIEW
RFQ # 112322
Preparedby: EngineeringDepartment
Dated: October25, 2022
ProposalDueDate: November23, 20223:00PM (EST)
Page 87 of 300
RFQ #112322DOCUMENTS Page1
COUNTYCOUNCILOFBEAUFORTCOUNTY
PROCUREMENTSERVICESDEPARTMENT
106IndustrialVillage Road, Bldg. 2 PostOffice Drawer1228
Beaufort, SouthCarolina29901-1228
PROPOSALNOTICENO. RFQ112322
CLOSINGDATE AND TIME: November23, 2022at 3:00PM (EST))
PROPOSALTITLE: William Hilton Parkway/US278CorridorIndependentReview
You areinvited to submitaproposal, in accordancewith therequirementsof this solicitationwhichare
containedherein.
Therewill beaMANDATORYmeetingwill beheldvirtually onNovember1, 2022/2:00PM (EST).
PleasecontactVictoria Moyerat victoria.moyer@bcgov.net to receiveyourinvite. All vendorsare
encouragedto attend.
In order for your proposalto be considered, it must be submittedin Vendor Registry no later than
November23, 2022at 3:00PM (EST)), at which time respondentsto this requestwill berecordedin the
presenceof oneor morewitnesses. RFQreceivedby theProcurementServicesDepartmentafterthetime
specifiedwill notbeconsidered. Dueto thepossibilityof negotiationwith all respondents, theidentity of
anyrespondentsorthecontentsof anyproposalshallnotbepublicinformationuntil afterthecontractaward
is made; therefore, thepublicis notinvited to theproposalclosing.
Theproposalmustbesignedby anofficial authorizedtobindtheConsultant, andit shallcontainastatement
to theeffectthattheproposalis firm for a periodof at least90 daysfrom theclosingdatefor submission
of proposal. ProposalmustbesubmittedthroughVendorRegistryby goingto theCountyWebsite
at www.beaufortcountysc.govandregisterasa vendor. Thereis nocostto registeryour company.
Thiswill allowyouto submityourRFQelectronically.
All submittals (seeSubmissionRequirements) receivedin responseto this Requestfor Proposalwill be
ratedby a SelectionCommittee, baseduponthe EvaluationForm containedwithin this RFQ. If the best
proposalrespondentis clearly identified from the point summary, there will not be a needfor oral
presentations. If not, thenanoralpresentationfrom aminimumof thetoptwo ratedfirms shallberequired.
This solicitationdoesnot commit BeaufortCountyto awarda contract, to pay anycostsincurredin the
preparationof aproposal, orto procureorcontractfor thearticlesof goodsorservices. TheCountyreserves
the right to acceptor rejectany or all proposalsreceivedasa resultof this request, to negotiatewith all
qualifiedfirms, or to cancelin partor in its entiretythissolicitation, if it is in thebestinterestsof theCounty
to doso.
OriginalSigned”
DaveThomas
ProcurementServicesDirector
843) 255-2304
Page 88 of 300
RFQ #112322DOCUMENTS Page2
IMPORTANT
ELECTRONIC SUBMITTAL REQUIREMENTS
Responsesubmittalsfor thisbid projectwill ONLY bereceivedelectronicallyandmustbesubmitted
ONLINEpriorto thedateandtimelistedonpage1 of thisBid document.
All responsesmustadhereto thefollowingguidelines:
Suppliersareencouragedtosubmitresponsesassoonaspossible. Responsesarereceivedinto
a ‘lockbox’ folderandcannotbeopenedprior to theduedateandtime. Thetimeanddateof
receiptasrecordedby theserverwill serveastheofficial timeof receipt. TheCountyis not
responsiblefor latesubmissions, regardlessof thereason.
All requestedinformationand forms MUST be uploadedas one file if possible. Each
submissionmustbeinclusiveof all forms. If necessaryto havemorethanoneupload, pricing
andsignedacknowledgements, etc. areto bein thefirst upload.
Submittalsmaybere-submittedpriorto thedateandtimeof bidopen; if multiplesubmissions
arereceivedfromthesamesource, thesubmissionwith thelatesttimestampwill takepriority.
If youhaveaproblemwith yourupload, youmaycontactVendorRegistryat844-802-9202or
cservice@vendorregistry.com.
Responseis to besubmittedONLINE by oneof thetwo methodsbelow:
a. UsetheLink: VendorRegistry.com
b. From theCounty’shomepage, selectBid Opportunities
Thesubmittingofferoris requiredto haveonthequalificationpackettheircompanyname,
contactinformation, theRFQnumber, openingdate, andtitle.
1. Questions: SubmitquestionsthroughVendorRegistry.
2. All submissionsto thisRFQmustnotexceed15double-sidedprintedpagesin length. Cover
sheetandtableof contentsareexcluded.
3. Submissionrequirementsarelocatedonpage19.
Page 89 of 300
RFQ #112322DOCUMENTS Page3
COUNTY COUNCIL OF BEAUFORT COUNTY
Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and Consultants
It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as “Beaufort County” or “the
County”, to comply with Title VI of the 1964 Civil Rights Act (Title VI) and its related statutes. To this end, Beaufort County
assures that no person shall be excluded from participation in, denied the benefit of, or subjected to discrimination under
any of its programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or language
regardless of whether those programs and activities are Federally funded or not. The County is also committed to assuring
every effort will be made to prevent the discrimination of low-income and minority populations as a result of any impact of
its programs or activities. Beaufort County also assures that every effort will be made to prevent discrimination through the
impacts of its programs, policies, and activities on minority and low-income populations. Additionally, the County will take
reasonable steps to provide meaningful access to services for persons with limited English proficiency. In addition, Beaufort
County will not retaliate against any person who complains of discrimination or who participates in an investigation of
discrimination. Beaufort County will, where necessary and appropriate, revise, update, and incorporate nondiscrimination
requirements into appropriate documents, directives, and regulations.
Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to
Prime Contractors, Subcontractors, Architects, Engineers, and Consultants, may not discriminate on the basis of race, color,
national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-
tier subcontractors may not discriminate in their election and retention of second-tier subcontractors, including those who
supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in
connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT)
and/or the Federal Highway Administration (FHWA).
In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County
to be performed under a subcontract, including procurements of materials or leases of equipment, each potential
subcontractor or supplier shall be notified by the Contractor of the Contractor' s obligations under the contract and
the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability,
religion, or language by providing such a statement in its bidding and contract documents.
Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant
thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may
be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations,
orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails
or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort
County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance
with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may
determine to be appropriate, including, but not limited to:
Withholding of payments to the Contractor under the contract until the Contractor complies, and/or
Cancellation, termination, or suspension of the contract, in whole or in part.
In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of
this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests
of USDOT and FHWA. Additionally, the Contractor may request the United States to enter into such litigation to protect the
interests of the United States. Any person or Subcontractor who believes that they have been subjected to an unlawful
discriminatory practice under Title VI has a right to file a formal complaint within one hundred eighty (180) days following
the alleged discriminatory action. Any such complaint must be filed in writing or in person:
Beaufort County Government
Post Office Drawer 1228 Beaufort, SC 29901-1228
843- 255-2304 Telephone E-mail: dthomas@bcgov. net
Page 90 of 300
RFQ #112322DOCUMENTS Page4
PROJECTPURPOSE
BeaufortCountyrequestsqualificationsfrom all interestedfirms, licensedin theStateof SouthCarolina,
experiencedin providingengineeringservicesto completeanindependentreview for long-termmobility
associatedwith theWilliam Hilton Parkway/US278CorridorImprovementproject.
SCOPEOF WORK
Task1: ProjectInitiation andCoordination:
Initial meetingwith Townof Hilton HeadIsland, BeaufortCounty, andIndependentConsultant
Biweeklyprojectdiscussionswith CountyandTownStaff
Reviewmeetingwith representationsof BeaufortCounty, Townof Hilton HeadIsland, SCDOT
andtheexistingdesignconsultantsonprior work performed
Monthly updatemeetingswith TownManagerandCountyAdministrator
Reviewanddefinethestudyarea
Performa sitevisit/field review
UnderstandtheTown of Hilton HeadIsland’s concernwith theproposedconceptandexisting
model
Identify whathasalreadybeencompletedfor theproject
Task2: ModelandRecommendedConceptReview
Reviewprevious modelsand conceptrecommendations
Reviewassumptionscontainedwithin themodel – Daily Hour, LandUse, & otherinput variables
Reviewdatacollectionapproachandstudyarea
Reviewmodeloutputsandsubsequentrecommendationsfor intersectionoperationsandbridge
concepts
Model Reviewand ConceptReviewMemo
Compilefindingsinto a SummaryReviewMemo, identifying primaryfindingsand
recommendationsfor improvement
Task3: UpdatingModel & OperationalUpdates
Model and Operational AnalysisUpdates
Themodelupdateswill bebasedon theversionof theLATS modelutilizedto developthe
project
Confirm thatthebasetraffic demandmodelaccuratelytakesinto trips generatedby visitor traffic,
masstransittraffic, andtraffic demandfrom redevelopmentfrom existingislandparcels.
Updatethemodelbasedonfindingsin Task2 andcoordinationwith theTownof Hilton Head &
BeaufortCounty
Expandthemodelandstudyareato includethefollowing signalizedintersectionsandmerge
pointseastof SpanishWellsRoad
US278mergewith CrossIslandParkway
US278Bus (William Hilton Parkway) atGumTreeRoad
US278Bus (William Hilton Parkway) atJarvisParkRoad
US278Bus (William Hilton Parkway) atPembrokeDrive/MuseumStreet
Page 91 of 300
RFQ #112322DOCUMENTS Page5
US278Bus (William Hilton Parkway) atIndigoRunDrive/WhoopingCraneWay
US278 (PalmettoBayRoad) atPointComfortRoad/Arrow Road
PalmettoBayRoadat TargetRoad
US278Bus (William Hilton Parkway) atPalmettoBayRoad (SeaPinesCircle)
Expandthemodelandstudyareato includethefollowing signalizedintersectionsandmerge
pointswestof Bluffton ParkwayFlyoveron US278
US278 (FordingIslandRoad) at BuckinghamPlantationDrive/MossCreekDrive (on
Mainland)
Bluffton ParkwayatBuckinghamPlantationDrive (onMainland)
Traffic countsfor thestudyareaintersectionswill beobtainedfrom theTownof Hilton Head
Island
Any additionalcountsnotavailablefrom theTown of Hilton Heador SCDOTshallbecollected
by theconsultantasnecessary.
Ensurethemodelincludesmostrecenttraffic datathatreflectsthetoll removalontheCross
IslandParkway
Generatemodeloutputsfor studyareawith newassumptionsandvolumes & analyzeoperations
in Synchro/VISSIM
EvaluatehowAdaptiveTraffic Signalscouldimpactthetraffic flow andaveragetraveltimes
alongthecorridorat peaktimesaswell asotherperiods. TheTownandCountyareexpectedto
implementAdaptiveSignalson theWilliam Hilton Parkway/US278Corridorfrom I-95to Sea
PinesCircle. Answerquestionsrelatedto potentialfor downstreamimpacts
Evaluateopportunitiesto achieveoperationalefficiencyby maintainingfour lanes (two lanesin
eachdirection) betweentheWindmill HarbourandSquirePopeRoadintersectionswith William
Hilton Parkway. Theseincludesystemimprovementsthatresultfrom IntelligentTraffic Systems
andotheroperationaladjustmentsthatmayprovideimprovedefficiencyin thesystem
Coordinateandrefinerecommendationswith theTownof Hilton HeadIslandandBeaufort
County
Participatein meetingsasdirectedby theTownof Hilton HeadIslandandBeaufortCounty
Task4: ProposedIntersectionImprovements & PotentialFutureProjects
Evaluatethesafetyfor bicycleandpedestrianswithin theoriginalProjectStudyAreafrom Moss
CreekDrive to SpanishWells Roadandmakerecommendationsonwaysto improvethesafetyof
theproposedintersections.
Identify potentialmodificationsto theproposedintersectiondesignsof thepreferredalternative
within theoriginalProjectStudyAreafrom MossCreekto SpanishWells Roadthatdeliverthe
same (or better) expectedoperationallevel within thesame (or smaller) footprint of thecurrently
plannedproject. Includeestimatedincreasedor decreasedcostsfor thepotentialmodificationsto
theintersectiondesigns. Potentialmodificationsthatincreasetheprojectfootprintandimpactsto
thehumanandnaturalenvironmentshouldbeexcluded.
Basedonthefindingsof Task3 for intersectionsoutsideof theoriginalprojectstudyarea,
developalternativesto improveoperationsin thefuture.
Evaluationshouldincludetraffic improvements (LOS, delay, etc.) aswell asanticipated
projectcostsandknownimpactsor concernswith thealternatives
Assumeupto 3 alternativesfor eachimpactedintersectionareevaluated
Page 92 of 300
RFQ #112322DOCUMENTS Page6
Developa Summaryof Recommendationsfor reviewby theTownof Hilton HeadandBeaufort
Countythatcanbeutilizedto securefuturefundingfor theimprovementsbeyondtheProject
StudyArea
Task5: Draft andFinal Report
Compilemodelupdates, operationalanalysis, andfindingsinto a reportfor a reviewand
discussionwith BeaufortCountyandHilton HeadIslandstaff.
Finalizeelementsinto draftandfinal reports, includingexecutivesummariesand
recommendations
Presentationof final findingsto bothCountyCouncilandTownCouncilfor
endorsement/adoptionby bothCouncils
Submitfinal reportelectronically
Page 93 of 300
RFQ #112322DOCUMENTS Page7
PROPOSALSUBMISSIONINSTRUCTIONS
1. Electronicallysubmitfile by usingthe VendorRegistryprocessthroughour CountyWebsiteat
www.beaufortcountysc.gov. File namemustcontaintheVendorsnameandProjectname:
a. ProposalSubmittal Contents (items #1-#5 on page8).
b. ExhibitsA&B
2. Consultant(s) will beemaileda copyof theStatementof Award.
3. Prohibitionof Gratuities: It shallbeunethicalfor anypersonto offer, or give, or agreeto giveany
County employeeor former County employee, or for any County employeeor former County
employeeto solicit, demand, accept, or agreeto acceptfrom anotherperson, a gratuityor anoffer
of employmentin connectionwith any decision, approval, disapproval, recommendation, or
preparationof any part of a purchaserequest, influencing the contentof any specificationor
procurementstandard, renderingof advice, investigation, auditing, or in any other advisory
capacityin anyproceedingor application, requestfor ruling, determination, claim or controversy,
or otherparticularmatter, pertainingto anyprogramrequirementor acontractor subcontract, or to
anysolicitationor proposaltherefore.
4. Questions
a. Submitquestionsat leastten (10) calendardaysprior to proposalclosingdateto Vendor
Registry
b. Answersto questionsreceivedthat would changeand/or clarify this solicitationwill be
providedbepostedonVendorRegistryasaddendum.
c. SelectionCommitteemembersSHALL NOT becontactedduringtheRFQprocess.
5. In orderto dobusinesswith theBeaufortCounty, vendorsmustregisterwith Procurement
Servicesthroughour VendorRegistrationsystem, poweredby VendorRegistry. TheCountymay
rejectanyquotes, bids, proposals, andqualificationssubmittedby businessesthatarenot
registered. Registeringalsoallowsbusinessesto identify thetypeof goodsandservicesthey
providesothattheymayreceiveemailnotificationsregardingrelevantsolicitationsoutfor bid.
To registerwith theCounty, goto www.beaufortcountysc.govandgoto theProcurementServices
Department’spageandclick on VendorRegistration. Onceregisteredyoumaysubmityourproposal
throughthesolicitationsectionin VendorRegistry.
Page 94 of 300
RFQ #112322DOCUMENTS Page8
PROPOSALSUBMITTAL CONTENTS
To achievea uniform reviewprocessandallow for adequatecomparability, theinformationis to
be organizedin the mannerspecifiedbelow andthe entirepackagemustnot exceed15 double-
sidedprintedpagesexcludingExhibit A andB, coverpagesandtabs.
1. ExecutiveSummary: Objectivesof theproject, scopeof work, andrelatedissueswhich mustbe
addressedthroughoutdevelopmentstagesof theplanning.
2. Approachto the Ranking/PlanningProcess: Explanationof the processto provide a ranking
systemthatis equitableandrepeatablebasedonparametersdefinedin thescopeof work.
3. Work PlanandScheduling – A summaryof tasksto beperformedfromevaluationof datathrough
County approvalof the final plan. Includea timeline of key milestonedatesto include overall
durationsfor eachmajortask.
4. Experienceand Qualifications: Experienceand qualificationsof the teammembers, with an
emphasison similar typeprojectcompletedwithin thelastfive (5) years. Provideanorganization
chartincludingsub-consultantsandcontractors.
5. List anyexceptions, qualifications, or exclusionsto thisRFQ:
ALL OTHER PAGESSHALL REMAIN PART OF THE RFQ
BY REFERENCE AND IT IS NOT NECESSARYTO RETURN THESE ITEMS.
Page 95 of 300
RFQ #112322DOCUMENTS Page9
ReservedRights
TheCountyshallnotberesponsiblefor anyof thecostsassociatedwith respondingto this requestandall
submittedmaterialsshallbecomethepropertyof theCounty. Furthermore, theCountyexpresslyreserves
theright andoptionsto:
Rejectanyor all consultantsandre-advertiseif deemednecessary
Waiveanyor all formalitiesandtechnicalities
Approve, disapprove, or cancelall servicesassociatedwith theproject
Selection & Notification
Theselectedfirms will begivenwrittennotificationof beingselectedby theCounty. This work maybe
awardedin wholeor in partat thesolediscretionof theCounty. TheCountywill negotiateandexecutea
contractwith theselectedfirm(s) prior to thebeginningof theactualservices. Shouldcontract
negotiationsfail, theCountywill negotiatewith oneor theotherhighly rankedfirms. In general, the
contractwill complywith applicablelawsandstandardprovisionsandshallcontainthefollowing terms:
Detailedscopeof services
Schedulefor providingservices
Page 96 of 300
RFQ #112322DOCUMENTS Page10
BeaufortCountyStandardsfor Contracting
CHAPTER1. TYPESOFCONSULTANTSERVICES
1-1. ConsultantServices
CHAPTER 2. PROCEDURESFOR SELECTION OF CONSULTANTS
2-1. General
2-2. Objective
2-3. Qualifications-BasedSelectionProcedures
2-4. SelectionCriteria
CHAPTER 3. CONTRACT FORMAT AND PROVISIONS
3-1. MandatoryContractProvisions
3-2. TimeOverrunsBeyondControlof theConsultant
CHAPTER 4. METHODS OF CONTRACTING AND ALLOWABLE COSTS
4-1. Allowable Costs
4-2. NonallowableCosts
4-3. FixedPayment
CHAPTER5. BEAUFORTCOUNTYSTANDARDCLAUSES
5-1. ContractRequirements
5-2. SpecialInstructions
Page 97 of 300
RFQ #112322DOCUMENTS Page11
CHAPTER1. TYPESOFCONSULTANTSERVICESREQUIRED:
BeaufortCountyrequestsqualificationsfrom all interestedfirms, licensedin theStateof SouthCarolina,
experiencedin providingengineeringservicesto completeanindependentreview for long-termmobility
associatedwith theWilliam Hilton Parkway/US278CorridorImprovementproject
CHAPTER2. PROCEDURESFORSELECTIONOFCONSULTANTS
2-1. GENERAL
Qualifications-basedproceduresrequirethatacontractfor consultingservicesbeawardedpursuant
to a fair and openselectionprocessbasedon the qualificationsof the firms. The feesfor such
servicesareestablishedfollowing selectionof a firm througha negotiationprocessto determinea
fair andreasonableprice.
2-2. OBJECTIVE
Consultantsemployedfor work on projectsshallberesponsibleandpossesstheability to perform
successfullyunderthetermsandconditionsof theproposedprocurement. Considerationshallbe
givento suchmattersasintegrity, recordof pastperformance, extentof experiencewith thetype
of servicesrequiredby the sponsor, technicalresources, and accessibilityto other necessary
resources.
2-3. QUALIFICATIONS-BASED SELECTIONPROCEDURES. Consultantsshallbeselectedbased
on their qualifications and experience, with fees determinedthrough negotiationsfollowing
selection. Thehighestrankedofferor shallbeselected, andprice shallbenegotiatedwith
highestrankingfirm asidentifiedthroughthequalifications-basedselectionprocedure.
2-4. SELECTIONCRITERIA. Criteriainclude, butarenotlimited to, thefollowing:
a) Experienceandknowledgewith local, state, andfederalregulationsandpermitting. Consultantto
disclosethetypeandnumberof projectsperformedfor SCDOT, BeaufortCountyor theTown of
Hilton Headoverthelast5 years.
b) Knowledgeof localconditionsandpotentialchallengesto beconsideredin developingtheproject.
Theability to addressandsolvechallengesin thedesignprocess.
c) Ability to providevariousdesignoptions, to evaluatecost-benefitanalysis, takingconstructionand
maintenancecostsinto consideration.
d) Track record in meeting deadlines, achieving positive results, and providing most cost-
effective/bestoptionsto implement.
Page 98 of 300
RFQ #112322DOCUMENTS Page12
CHAPTER3. CONTRACTFORMAT
3-1. MANDATORY CONTRACTPROVISIONS. All contractsinvolving Stateor Federalfundsmust
containtheapplicableprocurementstandardsin 49 CFR18.36. Listedbelowarethoseprovisions
which pertainto consultantcontracts:
a. Contractsshall contain provisions or conditions which will allow for administrative,
contractual, or legal remediesin instanceswherecontractorsviolate or breachcontract
termsandprovidefor sanctionsandpenaltiesasmaybeappropriate.
b. Contractsover $10,000 shall containsuitableprovisionsfor terminationby the sponsor,
includinghow it will beaffectedandthebasisfor settlement. In addition, contractsshall
describeconditionsunderwhich the contractmay be terminatedfor default as well as
conditionswherethe contractmay be terminatedbecauseof circumstancesbeyondthe
controlof theconsultant.
c. All negotiatedcontractsshall includeprovisionsto the effect that sponsors, the Federal
Departmentof Transportation, theComptrollerGeneralof theUnitedStates, or anyof the
duly authorizedrepresentativesshall haveaccessto any books, documents, papers, and
recordsof consultantswhich are directly pertinentto a specific grant program, for the
purposeof making audits, examinations, excerpts, and transcriptions. Sponsorsshall
requireconsultantstomaintainall requiredrecordsfor 3 yearsafterthesponsormakesfinal
paymentandall otherpendingmattersareclosed.
d. In additionto therequirementscontainedin 49CFRSection23, Participationby Minority
BusinessEnterprisesin Departmentof TransportationPrograms, and AC 150/5100-15,
Civil RightsRequirementsfor theAirport ImprovementProgram, currentedition, theTitle
VI, andDisadvantagedBusinessEnterpriseAssurancesin Appendix1 shallbeincludedin
eachcontract.
3-2. TIME OVERRUNSBEYOND CONTROLOFTHE CONSULTANT. Frequently, theconsultantis
calleduponto continuetechnicalinspectionserviceson constructioncontracts--overrunningtheprogram
schedulecontemplatedatthetime of negotiation. In mostinstances, thetime elementis beyondthecontrol
of theconsultant. To providefor thecontingencyof overrunof time, theagreementbetweenthe County
andtheconsultantwill statetheperiodfor whichthecompensationshallapplyandthattheconsultantshall
bereimbursedfor servicesin excessof thespecifiedperiodof time ata mutuallyacceptablefeenegotiated
at thetime all thepertinentcircumstancesareknown.
CHAPTER 4. METHODS OF CONTRACTING AND ALLOWABLE COSTS
4-1. ALLOWABLE COSTS.
a. Direct SalaryCosts.
1) Direct salary cost is defined as the cost of salariesof engineers, draftsmen,
surveyors, stenographers, clerks, etc., for time directlychargeableto theproject.
2) Salariesorimputedsalariesof partnersorprincipals, totheextentthattheyperform
technicalor advisoryservicesdirectlyapplicableto theproject, areto beaddedto
salarycost.
b. OverheadCosts. Overheadcosts include overheadon direct salary costs and general and
administrativeoverhead.
1) LaborOverhead. Overheadondirectsalarycostsincludessickleave, vacation, and
holiday pay; unemployment, excise, and payroll taxes; contributionsfor social
security, employmentcompensationinsurance, retirementbenefits, andmedical
insurancebenefits; andany otherbenefitscustomarilypaid to or enjoyedby all
Page 99 of 300
RFQ #112322DOCUMENTS Page13
employees. Theallowablepercentagefor laboroverheadallocableto a projectis
theratio of (a) a firm's total directlaboroverheadcoststo (b) a firm's total direct
salarycosts (excludingovertime) for a given period, usuallythe averagefor the
past3 years.
2) GeneralandAdministrativeOverhead. Generalandadministrativeoverhead
includesthefollowing indirectcostswhich arenotdirectlyattributableto specific
projects.
a) Provisionsfor office, light, heat, and similar terms for working space,
depreciationallowancesor rental for furniture, drafting equipmentand
engineeringinstruments, andoffice anddraftingsuppliesnot identifiable
to specificprojects.
b) Taxesandinsuranceotherthanthoseincludedassalarycostbutexcluding
stateandFederalincometaxes.
c) Library andperiodicalexpenses, andothermeansof keepingabreastof
advancesin engineeringsuchasattendanceat technicalandprofessional
meetingsand subscriptionsto trade, business, professional, or technical
periodicals.
d) Executive, administrative, accounting, legal, stenographic, and clerical
salaries, andexpenses (otherthanidentifiablesalariesincludedin salary
costsand expensesincludedin reimbursablenon-salary expenses, plus
salariesor imputedsalariesof partnersandprincipals) to the extentthat
they perform general executive and administrative services as
distinguishedfrom technicalor advisoryservicesdirectly applicableto
projects.
e) Costs of membershipsin trade, business, technical, and professional
organizations.
f) Incentive compensationfor managementemployees, cash bonuses,
suggestionawards, safetyawards, andincentivecompensationbasedon
production, costreduction, or efficient performanceareallowableto the
extentthat the overallcompensationis determinedto be reasonable, and
suchcostsarepaid or accruedpursuantto an agreemententeredinto in
goodfaith betweentheconsultantandtheemployeesbeforetheservices
arerenderedor pursuantto anestablishedplanfollowedby theconsultant
soconsistentlyasto imply, in effect, anagreementto makesuchpayment.
The allowable percentagefor general and administrative overhead
allocableto aprojectis theratio of (a) all generalandadministrativecosts
to (b) total direct salarycosts (excludingovertime) for a given period,
usuallytheaveragefor thepast3 years.
c. Direct Non-salaryExpenses. Direct non-salaryexpensesusuallyincurredmayincludethe
following (detailedrecordsmustbekeptsupportingchargesandallow auditing):
1) Living andtravelingexpensesof employees, partners, andprincipalswhenawayfrom the home
office on businessconnectedwith the project. (Recordsmust includeemployee
name, dates, pointsof travel, mileagerate, lodging, andmeals.)
2) Identifiablecommunicationexpensessuchaslong-distancetelephone, telegraph,
cable, expresscharges, andpostage, otherthanfor generalcorrespondence.
3) Servicesdirectly applicableto the work such as speciallegal and accounting
Page 100 of 300
RFQ #112322DOCUMENTS Page14
expenses, computerrental and programmingcosts, specialconsultants, borings,
laboratorycharges, commercialprintingandbindings, andsimilarcoststhatis not
applicableto generaloverhead.
4) Identifiabledraftingsuppliesandstenographicsuppliesandexpenseschargedto
the sponsor's work as distinguishedfrom such suppliesand expensesthat are
applicableto two or moreprojects.
5) Identifiable reproductioncosts applicable to the work such as blueprinting,
photosetting, mimeographing, printing, etc.
6) Advertisingcostswhicharesolelyfor therecruitmentof personnelrequiredfor the
performanceby theconsultantof obligationsarisingunderthecontract.
4-2. NON-ALLOWABLE COSTS. Theexpenseslistedbelowarenotallowablefor reimbursement:
a. Costsof amusementandsocialactivitiesandincidentalcostsrelatingtheretosuchasmeals,
lodging, rentals, transportation, andgratuities.
b. Contributionsanddonations.
c. Bad debts, including lossesdue to uncollectiblecustomer's accountsand other claims,
related collection costs, and related legal costs, arising from other businessesof the
consultant.
d. Dividend provisions or paymentsand, in the caseof sole proprietorsand partners,
distributionsof profit.
e. Interestonborrowedcapital.
f. Bonuspaymentfor earlycompletionof work.
4-3. FIXED PAYMENT. To all theestimatedcosts, includingoverhead, apercentagerateis appliedto
determinepaymentfor profit, willingnessto serve, andassumptionof responsibility.
CHAPTER5. BEAUFORTCOUNTYSTANDARDCLAUSES
CONTRACTUALREQUIREMENTS
1.0 EXCUSABLEDELAY: TheFirm shallnotbeliable for anyexcesscosts, if thefailureto perform
thecontractarisesoutof causesbeyondthecontrolandwithoutthefault or negligenceof theFirm.
Suchcausesmayinclude, but arenot restrictedto, actsof Godor of thepublic enemy, actsof the
Governmentin eitherits sovereignor contractualcapacity, fires, floods, epidemics, quarantine
restrictions, strikes, freightembargoes, andunusuallysevereweather; but in everycasethefailure
to performmustbebeyondthecontrolandwithoutthefault or negligenceof theFirm. If thefailure
to performis causedby the default of a subcontractor, and if suchdefault arisesout of causes
beyondthecontrolof boththeFirm andthesubcontractor, andwithout thefault or negligenceof
eitherof them, theFirm shall not beliable for anyexcesscostsfor failure to perform, unlessthe
suppliesor servicesto be furnishedby the subcontractorwereobtainablefrom othersourcesin
sufficienttimeto permittheFirm to meettherequireddeliveryschedule.
2.0 S.C. LAW CLAUSE: Upon awardof a contractunderthis Requestfor QUALIFICATIONS, the
person, partnership, association, or corporationto whomtheawardis mademustcomplywith local
andStatelawswhich requiresuchpersonor entity to beauthorizedand/or licensedto do business
in BeaufortCounty. Notwithstandingthefact thatapplicablestatutesmayexemptor excludethe
successfulofferorfromrequirementsthatit beauthorizedand/orlicensedto dobusinessin Beaufort
County, by submissionof thissignedRequestfor QUALIFICATIONS theofferoragreesto subject
Page 101 of 300
RFQ #112322DOCUMENTS Page15
itself to thejurisdiction andprocessof theFourteenthJudicialCircuit Courtof BeaufortCounty,
as to all mattersanddisputesarisingor to ariseunderthe contractandthe performancethereof
including any questionsas to the liability for taxes, licenses, or fees levied by Stateor local
government.
3.0 OFFEROR’S QUALIFICATIONS: Firms must, uponrequestof theCounty, furnish satisfactory
evidenceof their ability to furnish servicesin accordancewith the termsand conditionsof this
Requestfor QUALIFICATIONS. The ProcurementServicesDepartmentreservesthe right to
makethe final determinationasto the offeror’s ability to providethe servicesrequestedherein,
beforeenteringinto anycontract.
4.0 OFFERORRESPONSIBILITY: EachFirm shallfully acquainthimselfwith conditionsrelatingto
thescopeandrestrictionsattendingtheexecutionof thework undertheconditionsof this Request
for QUALIFICATIONS. Thefailureoromissionof anofferorto acquaintthemselveswith existing
conditions shall in no way relieve him of any obligation with respectto this Requestfor
QUALIFICATIONS or to thecontract.
5.0 AFFIRMATIVE ACTION: The Firm will takeaffirmative actionin complyingwith all Federal
and Staterequirementsconcerningfair employmentand employmentof the handicappedand
concerningthe treatmentof all employees, without regardor discriminationby reasonof race,
religion, sex, nationalorigin, or physicalhandicap.
6.0 FIRM RESPONSIBILITIES: The Firm will be requiredto assumesole responsibilityfor the
completeeffort, asrequiredby this RFQ. TheCountywill considertheFirm to bethesolepoint
of contactwith regardto contractualmatters.
7.0 SUBCONTRACTING: If any part of the work coveredby this RFQ is to be subcontracted, the
Firm shall identify the subcontractingorganizationandthe contractualarrangementsmadewith
same. All subcontractorsmustbeapproved, in writing by theCounty, or whenapplicableapolitical
subdivisionwithin the County with the County’s concurrence. The successfulFirm will also
furnishthecorporateorcompanynameandthenamesof theofficersof anysubcontractorsengaged
by the Firm. The County reservesthe right to reject any or all subcontractorsand require
substitutionof a firm qualifiedto participatein thework asspecifiedherein.
8.0 OWNERSHIPOFMATERIAL: Ownershipof all data, material, anddocumentationoriginatedand
preparedfor theCountypursuantto this contractshallbelongexclusivelyto theCounty.
9.0 PERFORMANCEAND PAYMENT BONDS: (NOT Requiredfor ProfessionalServices) The
successfulContractorshall furnish, within ten (10) days after written notice of acceptanceof
Requestfor QUALIFICATIONS, PerformanceandPaymentBonds. Contractorshallprovideand
paythecostof abothbonds. TheBondsshallbein theamountof onehundredpercent (100%) the
contract, issuedby a SuretyCompanylicensedin SouthCarolinawith an “A” minimumratingof
performanceas statedin the most currentpublication of “Best’s Key Rating Guide, Property
Liability” which shallshowa financialstrengthratingof at leastfive (5) timestheContractPrice.
TheBondshallbeaccompaniedby a “Powerof Attorney” authorizingtheattorney-in-fact to bind
thesuretyandcertifiedto includethedateof thebond.
10.0 NONRESIDENTTAXPAYERS: If theofferor is a SouthCarolinanonresidenttaxpayerandthe
contractamountis $10,000.00or more, theofferoracknowledgesandunderstandsthatin theevent
heis awardeda contractofferor shallsubmita NonresidentTaxpayerRegistrationAffidavit (State
Page 102 of 300
RFQ #112322DOCUMENTS Page16
form #1-312-6/94), beforea contractcanbe signed. Affidavit mustcertify that the nonresident
taxpayeris registeredwith theS.C. Departmentof Revenueor theS.C. Secretaryof State’sOffice,
in accordancewith Section12-9-310(A) (2) (3) of S.C. Codeof Laws (1976) asamended.
11.0 BUSINESSLICENSEIn accordancewith the BeaufortCountyBusinessLicenseOrdinance, 99-
36, Article III, asenactedNovember22, 1999, anybusinessor individualgeneratingincomein the
unincorporatedareaof BeaufortCounty is requiredto pay an annuallicensefee and obtain a
businesslicense. The ordinancereferencedis available on the Beaufort County website at
www.beaufortcountysc.gov or by calling the BusinessLicenseAdministratorat (843) 255-2270
for a list of schedules.
12.0 ADDITIONAL ELIGIBILITY: Other BeaufortCounty Public Procurementunits shall, at their
option, beeligible for useof anycontractsawardedpursuantto this Invitation.
13.0 INSURANCE REQUIREMENTS: Prior to commencing work/delivery hereunder,
Contractor/Firm, athis expense, shallfurnishinsurancecertificationshowingthecertificateholder
asBeaufortCounty, P.O. Drawer1228, Beaufort, SC29901-1228, Attention: ProcurementServices
Director and with a specialnotation namingBeaufort County as an additionalinsuredon the
liability coverage. Minimum coverageshallbeasfollows:
A) Worker’sCompensationInsurance - Contractorshallhaveandmaintain, duringthelife of
this contract, Worker’s CompensationInsurancefor his employeesconnectedto the
work/delivery, in accordancewith the Statutesof the Stateof SouthCarolinaand any
applicablelaws.
B) CommercialGeneralLiability Insurance – Contractorshallhaveandmaintain, duringthe
life of this contract, CommercialGeneralLiability Insurance. SaidCommercialGeneral
Liability Policy shall containContractualLiability and Products/CompletedOperations
Liability subject to the following minimum limits: $ 1,000,000 Each Occurrence/
2,000,000GeneralAggregateand $2,000,000Products/CompletedOperationsAggregate
namingBeaufortCountyasanadditionalinsured.
C) ComprehensiveAutomobileLiability Insurance - TheContractorshallhaveandmaintain,
duringthelife of thiscontract, ComprehensiveAutomobileLiability, includingnon-owned
andhiredvehicle, of at least $500,000COMBINED SINGLELIMIT.
D) ADDITIONAL INSURANCE REQUIREMENT: Umbrella Liability Insurance –
Contractorshall haveand maintain, during the life of this contract, Umbrella Liability
Insurancewith aminimumlimit of $2,000,000
E) ProfessionalLiability ( Errors & Omissions) – The vendorshall maintaina limit no less
than $1,000,000peroccurrence.
F) Therequiredinsurancepolicy at thetime of issuemustbewritten by a companylicensed
to dobusinessin theStateof SouthCarolinaandbeacceptableto theCounty.
G) TheContractor/vendorshallnotcauseanyinsurancetobecanceledorpermitanyinsurance
to lapse. All insurancepoliciesshallcontaina clauseto theeffectthatthepolicy shallnot
be canceledor reduced, restricted, or limited until fifteen (15) daysafterthe Countyhas
receivedwritten notice, as evidencedby return receiptof registeredor certified letter.
Certificatesof
Insuranceshall containtranscriptfrom the properoffice of theinsurer, the location, and
theoperationsto whichtheinsuranceapplies, theexpirationdate, andtheabove-mentioned
noticeof cancellationclause.
H) Theinformationdescribedabovesetsforth-minimumamountsandcoveragesandis notto
beconstruedin anyway asa limitation ontheContractor’sliability.
Page 103 of 300
RFQ #112322DOCUMENTS Page17
14.0 INDEMNITY:
The Firm herebyagreesto indemnify and saveharmlessthe County, its officers, agents, and
employeesfrom andagainstanyandall liability, claims, demands, damages, fines, fees, expenses,
penalties, suits, proceedings, actionsandcostof actions, includingattorney’s feesfor trial andon
appealof any kind and naturearising or growing out of or in any way connectedwith the
performanceof the Agreement, whetherby act of omissionsof the Firm, its agents, servants,
employeesor others, or becauseof or dueto the mereexistenceof the Agreementbetweenthe
parties.
15.0 TERMINATION FORDEFAULT:
15.1 The performanceof Work underthe Agreementmay be terminatedby the Procurement
ServicesDirector, in accordancewith this clause, in wholeor in part, in writing, whenever
theDirectorof ProcurementServicesshalldeterminethattheContractorhasfailedto meet
theperformancerequirementsof this Agreement.
15.2 TheProcurementServicesDirectorhastheright to terminatefor default, if theFirm fails
to makedeliveryof thecontracteddeliverablesor performtheWork, or if theFirm fails to
performtheWork within thetimespecifiedin theAgreement, orif theFirm fails toperform
anyotherprovisionsof theAgreement.
16.0 TERMINATION FORCONVENIENCE: The Countymay without causeterminatethis contract
in wholeor in partatanytimefor its convenience. In suchinstance, andadjustmentshallbemade
to the Firm, for the reasonablecostsof the work performedthrough the date of termination.
Terminationcostsdo not includelost profits, consequentialdamages, delaydamages, unabsorbed
or underabsorbedoverheadof theFirm or its subcontractors, and/or failureto includetermination
for convenienceclauseinto its subcontractsand materialpurchaseordersshall not exposethe
Countyto liability for lost profits in conjunctionwith a terminationfor conveniencesettlementor
equitableadjustment. The Firm expresslywaives any claims for lost profit or consequential
damages, delaydamages, or indirectcostswhichmayarisefrom theCounty’selectionto terminate
this contractin wholeor in partfor its convenience.
17.0 TERMINATION FORNON-APPROPRIATIONS: Fundsfor this contractarepayablefrom State
and/or Federaland/or BeaufortCountyappropriations. In the eventsufficient appropriationsare
notmadeto paythechargesunderthecontractit shallterminatewithoutanyobligationto Beaufort
County.
Page 104 of 300
RFQ #112322DOCUMENTS Page18
SPECIALINSTRUCTIONS
1.0 INTENT TO PERFORM: It shallbetheFirm’s responsibilityto advisetheProcurementServices
Departmentif anylanguage, requirements, etc., or anycombinationsthereofinadvertentlyrestricts
or limits therequirementsstatedin thisRFQto asinglesource. Suchnotificationmustbesubmitted
in writing andmustbe receivedby the ProcurementServicesDepartmentnot laterthanten (10)
daysprior to the Requestfor QUALIFICATIONS openingdate. A review of suchnotifications
will bemade.
2.0 RECEIPTOF REQUESTFOR QUALIFICATIONS: Requestfor Qualifications, amendments
thereto, or withdrawalrequestsreceivedafter the time advertisedfor Requestfor Qualifications
openingwill bevoid, regardlessof whentheyweremailed.
3.0 PREPARATIONOFREQUESTFORQUALIFICATIONS
3.1 All Requestsfor QUALIFICATIONS shouldbecompleteandcarefullywordedandmust
conveyall theinformationrequestedby theCounty. If significanterrorsarefoundin the
offeror’sRequestfor QUALIFICATIONS, or if theRequestfor QUALIFICATIONS fails
to conformto theessentialrequirementsof theRFQ, theCountyandtheCountyalonewill
be the judgeas to whetherthat varianceis significantenoughto reject the Requestfor
QUALIFICATIONS.
3.2 Requestfor QUALIFICATIONS shouldbepreparedsimply andeconomically, providing
astraightforward, concisedescriptionof offerorscapabilitiesto satisfytherequirementsof
theRFQ. Emphasisshouldbeon completenessandclarity of content.
3.3 Eachcopyof theRequestfor QUALIFICATIONS shouldbeboundin a singlefile where
practical. All documentationsubmittedwith theRequestfor QUALIFICATIONS should
beboundin thatsinglefile.
3.4 If yourRequestfor QUALIFICATIONS includesanycommentoverandabovethespecific
informationrequestedin ourRequestfor Requestfor QUALIFICATIONS (RFQ), youare
toincludethisinformationasaseparateappendixtoyourRequestfor QUALIFICATIONS.
4.0 AMENDMENTS: If it becomesnecessaryto reviseany part of the RFQ, an amendmentwill be
providedto all offerorswho receivedthe original Requestfor Requestfor QUALIFICATIONS.
TheCountyshallnotbelegallyboundby anamendmentor interpretationthatis notin writing.
5.0 ADDITIONAL INFORMATION: Offerors requiring additional information may submit their
questions, in writing throughVendorRegistry. Answersto questionsreceivedthatshouldchange
and/or clarify thissolicitationwill beprovidedin writing to all offerorsvia anamendment.
6.0 ORAL PRESENTATION/DISCUSSIONS: Any offeror or all offerorsmay berequestedto make
anoral presentationof their Requestfor QUALIFICATIONS to theCounty, aftertheRequestfor
QUALIFICATIONS opening. Discussionsmaybeconductedwith responsibleFirms, whosubmit
Requestfor QUALIFICATIONS determinedto be reasonablysusceptibleof being selectedfor
awardfor the purposeof clarification to assurefull understandingof and responsivenessto the
solicitationrequirement.
Page 105 of 300
RFQ #112322DOCUMENTS Page19
Firms shall be accordedfair andequaltreatmentwith respectto anyopportunityfor discussions
and revision of Requestfor QUALIFICATIONS, and such revisionsmay be permittedafter
submissionsandprior to award. Thepurposeof thesepresentations/discussionswill beto:
A) Determinein greaterdetailsuchofferor’s QUALIFICATIONS.
B) Explorewith theFirm thescopeandnatureof theproject, theofferor’s proposedmethod
of performance, andtherelativeutility of alternativemethodsof approach.
C) Determinethat the Firm will make availablethe necessarypersonneland facilities to
performwithin therequiredtime.
D) Agreeuponfair andreasonablecompensation, takinginto accounttheestimatedvalueof
the requiredservices, the scopeandcomplexityof proposedproject, andnatureof such
services.
7.0 FUNDING: The offeror shall agreethat fundsexpendedfor the purposesof thecontactmustbe
appropriatedby the County Council for eachfiscal year included within the contractperiod.
Therefore, thecontractshallautomaticallyterminatewithout penaltyor terminationcostsif such
fundsarenot appropriated. In theeventthatfundsarenot appropriatedfor thecontract, theFirm
shallnotprohibitor otherwiselimit theCounty’sright to pursueandcontractfor alternatesolutions
andremedies, asdeemednecessaryby theCountyfor theconductof its affairs. Therequirements
statedin this paragraphshallapplyto anyamendmentor theexecutionof anyoptionto extendthe
contract.
8.0 AWARD: An awardresultingfrom thisrequestshallbeawardedto theresponsiveandresponsible
Firm whoseRequestfor QUALIFICATIONS is determinedto bemostadvantageousto theCounty,
taking into considerationprice andthe evaluationfactorssetforth herein; however, the right is
reservedto rejectanyandall Requestfor QUALIFICATIONS received, andin all casestheCounty
will be the sole judge as to whethera Firm’s Requestfor QUALIFICATIONS hasor hasnot
satisfactorilymettherequirementsof this RFQ.
9.0 PUBLIC ACCESS TO PROCUREMENT INFORMATION: No such documentsor other
documentsrelatingto this procurementwill bepresentedor madeotherwiseavailableto anyother
person, agency, or organizationuntil afteraward. Commercialor financialinformationobtained
in responseto thisRFQ, whichis privilegedandconfidential, will notbedisclosed. Suchprivileged
and confidentialinformationincludesinformation which, if disclosed, might causeharm to the
competitivepositionof theofferor supplyingtheinformation. All Firms, therefore, must visibly
mark as “Confidential” eachpart of their Requestfor QUALIFICATIONS, which they
considercontainingproprietaryinformation.
10.0 DEVIATIONS: Any deviationsfrom therequirementsof this RFQmustbe listedseparatelyand
identifiedassuchin thetableof contents.
12.0 GRATUITIES: It shall beunethicalfor anypersonto offer, or give, or agreeto give anyCounty
employeeor formerCountyemployee; or for anyCountyemployeeor formerCountyemployeeto
solicit, demand, accept, or agreeto acceptfrom anotherpersonagratuityor anofferof employment
in connectionwith anydecision, approval, disapproval, recommendation, orpreparationof anypart
of a programrequirementor a purchaserequest, influencingthe contentof any specificationor
procurementstandard, renderingof advice, investigation, auditing, or in any other advisory
capacityin anyproceedingor application, requestfor ruling, determination, claim or controversy,
Page 106 of 300
RFQ #112322DOCUMENTS Page20
or otherparticularmatterpertainingto anyprogramrequirement, or acontractor subcontract, or to
anysolicitationor Requestfor QUALIFICATIONS therefore.
13.0 KICKBACKS: It shallbeunethicalfor anypayment, gratuity, or offer of employmentto bemade
by or onbehalfof a subcontractorunderacontractto theprimeor highertier subcontractor, or any
personassociatedtherewith, asaninducementfor theawardof a subcontractororder.
14.0 PROTESTPROCEDURES
14.1 Right to Protest: Any actualor prospectivebidder, offeror, or firm, who is aggrieved, in
connectionwith the solicitationor awardof a contract, may protestto the Procurement
ServicesDirector. Theprotestshallbesubmittedin writing fourteen (14) daysaftersuch
aggrievedpersonknowsor shouldhaveknownof thefactsgiving risethereto. Theprotest
mustbeaccompaniedby adetailedstatement, indicatingthereasonsfor suchprotest.
14.2 Authority to ResolveProtest: The ProcurementServicesDirector shall haveauthority,
prior to thecommencementof anactionin courtconcerningthecontroversy, to settleand
resolvea protestof an aggrievedbidder, offeror, or contractor; actual or prospective,
concerningthesolicitationor awardof a contract.
14.3 Decision: If the protestis not resolvedby mutualagreement, the ProcurementServices
Directorshallissuea decision, in writing within ten (10) days. Thedecisionshall,
A) Statethereasonsfor theactiontaken; and
B) Inform the protestantof its right to administrativereview as provided in this
Section.
14.4 Notice of Decision: A decisionunderSubsection (3) of this Sectionshall be mailedor
otherwisefurnishedimmediatelyto theprotestantandanyotherpartyintervening.
14.5 Finality of Decision: A decisionunderSubsection (3) of this Sectionshall befinal and
conclusive, unlessfraudulent, or
A) Any personadverselyaffectedby thedecisionappealsadministratively, within ten
10) daysafterreceiptof decisionunderSubsection (3) to theCountyCouncilin
accordancewith this Section.
B) Any protesttakento theCountyCouncilor courtshallbesubjectto theprotestant
payingall administrativecosts, attorneyfees, andcourtcostswhenit is determined
thattheprotestis without standing.
Page 107 of 300
RFQ #112322DOCUMENTS Page21
EXHIBIT A
Certification regarding Debarment, Suspension, Ineligibility, and Voluntary
exclusion
Thecontractorcertifies, by submissionof this qualificationstatementor acceptanceof acontract, that
neitherit nor its principalsis presentlydebarred, suspended, proposedfor debarment, declaredineligible,
or voluntarily excludedfrom participationin this transactionby anyState, Federaldepartment, or agency.
It furtheragreesby submittingthis qualificationstatementthatit will includethis clausewithout
modificationin all lowertier transactions, solicitations, proposals, contracts, andsubcontracts. Wherethe
bidder/contractoror anylower tier participantis unableto certify to thisstatement, it shallattachan
explanationto this solicitation/bid.
Statewhetheryourcompanyhasbeeninvolvedin anylitigationwithin thepastfive (5) years,
arisingoutof yourperformance.
CircleYesor No
if you answeryes, explain fully if it hasbeeninvolved in any litigation involving performance.
Page 108 of 300
RFQ #112322DOCUMENTS Page22
EXHIBIT B
CERTIFICATIONBY CONTRACTOR
Regarding
NON-SEGREGATEDFACILITIES
The Bidder certifiesthat he doesnot, and will not, provideandmaintainsegregatedfacilities for his
employeesat his establishmentsand, further that he doesnot, and will not, permit his employeesto
performtheir servicesat thoselocations, underhis control, wheresegregatedfacilities areprovidedand
maintained. Segregatedfountains, transportation, parking, entertainment, recreation, ad housing
facilities; waiting, rest, wash, dressing, andlockerroom, andtime clock, work, storage, restaurant, and
othereatingareaswhich aresetapartin fact, or by explicit directive, habit, local custom, or otherwise,
basedon color, creed, nationalorigin, andrace. TheBidder agreesthat, exceptwherehe hasobtained
identicalcertificationsfrom proposedsubcontractorsfor specifictime periods, he will obtainidentical
certificationsfrom proposedsubcontractorsprior to theawardof subcontractorsexceeding $10,000.00
which arenot exemptfrom theprovisionsof theEqualOpportunityclause, andthathewill retainsuch
certificationsin his files.
TheBidderagreesthata breachof thiscertificationis aviolation of theEqualOpportunityclausein this
Contract. Thepenaltyfor makingfalsestatementsis prescribedin 18 U.S.C. 1001.
Contractor
Signature)
NameandTitle of Signer
Date
Page 109 of 300
RFQ #112322DOCUMENTS Page23
EXHIBIT C
EVALUATIONFORM
DATE: ________________________
RFQ#: ______ TITLE: ___________________
OFFEROR: _____
POINTRANGE POINTSASSIGNED
1.0
Experienceandknowledgewith local,
state, andfederalregulationsand
permitting. Consultantto disclosethetype
andnumberof projectsperformedfor
SCDOT, BeaufortCountyor theTownof
Hilton Headoverthelast5 years. 0-25Points
2.0 Knowledgeof local conditionsand
potentialchallengesto beconsideredin
developingtheproject. Theability to
addressandsolvechallengesin thedesign
process. 0-25Points
3.0 Ability to providevariousdesignoptions,
to evaluatecost-benefitanalysis, taking
constructionandmaintenancecostsinto
consideration 0-25Points
4.0 Trackrecordin meetingdeadlines,
achievingpositiveresults, andproviding
mostcost-effective/bestoptionsto
implement. 0-25Points
Page 110 of 300
TOWNOF HILTON HEAD ISLAND
RFQTransmittalPage
1 | Page
DateAdvertised: February ##, 2023
OfferorsShallCompleteAllInformationRequestedOnThisPageandSubmitItWithTheirQualifications
REQUEST FOR
QUALIFICATIONS
RFQ)
QualificationsSubmission:
QualificationswillONLYbeacceptedelectronicallyviathe
Town’sProcurementPortalwhichcanbeaccessedusingthe
linkbelow:
hiltonheadislandsc.bonfirehub.com
SolicitationNumber:
RFQ2023-##
Description/Title:
IndependentReviewoftheWilliamHiltonParkway
GatewayCorridor
QualificationsSubmittalDeadline:
10:00amEasternTimeon _______, 2023
Submittalswillnotbeacceptedafterthestatedtimeanddate.
Submittalswillbepublicallyopenedviavirtualconference
at 10:15amEasternTimeon _____, 2023. Thelinktoparticipate
inthevirtualopeningisprovidedinSectionIofthisRFQ.
Pre-SubmittalConferenceInformation: Notapplicableforthissolicitation
TownContact:
RichardGroth, ProcurementOfficer
richg@hiltonheadislandsc.gov
843) 341-4711
DeadlineForQuestions:
2:00pm EasternTimeon _______, 2023
QuestionsmustbesubmittedthroughtheTown’sProcurement
Portalusingthe “OpportunityQ&A” featureinthe “Messages”
SectionofthePortal.
OfferorName: OfferorContactName:
OfferorMailingAddress: OfferorContactPhone:
City-State-Zip-Code: OfferorContactEmailAddress:
Bysignaturebelow, Icertifythatthissubmissionismadeandsubmittedwithoutpriorunderstanding, agreement, orconnectionwithanycorporation, firmor
anycorporation, firm, orpersonsubmittingqualificationsforthesamematerials, supplies, equipmentorservices, andisinallrespectsfairandwithout
collusionorfraud. Iagreethatthissubmittalshallbegoodandheldopenforaperiodofatleastsixty (60) daysfromtheSubmittalDeadline. I agreetoabide
byallconditionsofthissolicitationandcertifythatIamauthorizedtosignthisdocumentonbehalfoftheOfferor.
OfferorAuthorizedSignature:
Signature Date
NameandTitleofSignator:
Name:______________________________________________
Title:_______________________________________________
Page 111 of 300
2 | Page
TOWNOFHILTONHEADISLAND
RFQ2023-##
IndependentReviewof the William Hilton ParkwayGatewayCorridor
I. GENERALINFORMATIONANDSUBMITTALINSTRUCTIONS
The Town of Hilton HeadIslandis solicitingresponsesfrom qualified engineering
firms (“Offerors” or “Consultants”) licensedin SouthCarolinato provideIndependent
Reviewof the WilliamHiltonParkwayGatewayCorridor for the Townin accordance
with the scopeof work andspecificationsprovidedherein.
Qualificationsmustbe submittedby the QualificationsSubmittalDeadlineshownon
the TransmittalPage. Qualificationswill ONLYbe acceptedelectronicallyvia the
Town’s Procurement Portal which can be accessedusing the following link
hiltonheadislandsc.bonfirehub.comhttps://hiltonheadislandsc.bonfirehub.com/portal. If
electronic submittal poses a hardship, please notify the Town Contact person
identifiedon the TransmittalPage.
There will be a MANDATORYmeeting will be held virtually on February ##,
2023/#:00PM (EST). Pleasecontact RichGroth at richg@bcgov.net to request an
invitation. Only vendorsthat attend this meeting shall be qualified to submit a
proposal. TheTownwill haveanadvisorycommitteeandreviewthe submittalsand
makerecommendationfor selectionbasedon the statedcriteria.
Submittalswill be publicallyopened via virtual conferenceat the date and time
indicatedon the TransmittalPage. Onlythe namesof Offerorswill be providedat
the opening. Noother informationwill besharedat that time. Toparticipate, please
usethe followingmeetinglink andinformation.
Virtual Openingof SubmittalsLinkandInformation
10:15am EasternTimeon _______, 2023
Tojoin the meetingon a computeror mobilephone:
https:// bluejeans.com/8433843231?src=calendarLink&flow=joinmeeting
PhoneDial-in
1.404.458.0105 (UnitedStates)
1.312.216.0325 (US (Chicago))
GlobalNumbers: https:// www.bluejeans.com/numbers
MeetingID: 8433843231
Wantto test yourvideoconnection?
https:// bluejeans.com/111
All questionsregardingthis solicitationmustbesubmittedin writing viathe Town’s
Page 112 of 300
3 | Page
Procurement Portal using the “Opportunity Q&A” feature in the “Messages”
Section. Questionswill be answeredvia the ProcurementPortal as well. Offeror’s
who havedownloadedan originalsolicitationwill receiveemail notification if any
addendumshavebeenissuedfor that solicitation. However, it is still the Offeror’s
responsibilityto checkthe procurementportal for any issuedaddendumsprior to
submitting their qualifications.
TheTownreservesthe right to acceptor reject any or all submittalsreceivedasa
result of this solicitation, to negotiatewith all qualifiedOfferors, to awardmultiple
contractsfor all or part of the scopeof work, or to cancelin part or in whole this
solicitation, if in the bestinterestsof the Town. TheTownreservesthe right to refuse
any and all submittalsand to waive any technicalitiesand formalities. The Town
reservesthe right to waive any requirementin this solicitation, includingmaterial
requirements, if suchrequirement is unmet by all Offerors, and, sucha waiver is
determinedto bein the bestinterestsof the Town.
Thissolicitationdoesnot committhe Townto awarda contractor to procurefor any
articlesof goodsor services. TheTownshallnot incuror payfor anycostsassociated
with the preparationof Offerorsubmittals.
Submittalsmust be signedby an official of Offeror authorized to bind Offeror.
Electronicsignatureusingsecuresignaturesoftware is acceptable. By submitting,
Offeroragreesthat its submittalshallbe goodandheldopenfor a periodof at least
sixty (60) daysfrom the DueDate.
The Town does not discriminateon the basisof race, color, national origin, sex
includingpregnancyandchildbirth (or relatedmedicalconditions)], religion, ageor
disabilityin employmentor in the provisionof goodsandservices.
The Town recognizesthat small businessesenterprises as well as businesses
enterprisesowned and operated by women and/or minority persons (collectively
disadvantagedbusiness”) havehistoricallyfacedchallengesresultingin lessthanfull
participation in the free enterprisesystemto a degreedisproportionateto other
businesses. Therefore, the Towniscommittedto ensuringthat suchdisadvantaged
businessenterprisesareaffordedeveryopportunity to fully andfairly participatein
the Town’s procurementprocessfor goodsand services. In the eventof a tie after
the scoringof responsesinvolving a certified disadvantagedOfferor and a non-
disadvantagedOfferor, the Town will award the contract to the certified
disadvantagedOfferor. Tied responses involving two certified disadvantaged
Offerorswill be settledby selectingthe Offeror havingthe lowest total cost to the
Town. It is the obligationof the disadvantagedOfferor to submit proof of current
certificationfrom agovernmentalentity in the UnitedStatesat the time theysubmit
their responsein order for the certification to be consideredby the Town in
determining an award as describedabove. Tied responsesinvolving two non-
disadvantagedOfferorswill be settled by selectingthe Offeror havingthe lowest
total costto the Town.
Page 113 of 300
4 | Page
II. SCOPEOFWORK
TheTowndesiresto contractwith qualifiedfirm to conductan IndependentReview
of the WilliamHilton ParkwayGatewayCorridorproject. It isthe intent of the Town
to have the selected firm review and verify the assumptions, methodologies,
alternatives and preferred designrecommendationare technicallyaccurateand
servethe bestinterestof HiltonHeadIsland. Thespecificscope, scheduleandfeefor
the servicesnecessaryto develop the plan will be negotiated once the firm is
selected. Anticipatedservicesandtasksassociatedwith the developmentof the plan
mayinclude, but arenot limited to, the following:
Task1: ProjectInitiation andCoordination:
Initial meeting with Town of Hilton HeadIsland, Beaufort County, and
IndependentConsultant
ConductBi-weeklyprojectstatusmeetingswith Townstaffandthe project
advisorycommittee.
Reviewmeetingwith representationsof BeaufortCounty, Townof Hilton
Head Island, SCDOTand the existingdesignconsultantson prior work
performed
Monthly updatemeetingswith TownManager
Reviewanddefinethe studyarea
Performa sitevisit/field review
Understandthe Townof Hilton HeadIsland’s concernwith the proposed
conceptandexistingmodel
Identifywhat hasalreadybeencompletedfor the project
Task2: ReviewModel DataandRecommendedDesignConcept
Reviewassumptionscontainedwithin the model – Daily, Hour, LandUse,
other input variables
Reviewdatacollectionapproachandstudyarea
Reviewmodeloutputsandsubsequentrecommendationsfor intersection
operationsandbridgeconcepts
Model ReviewandConceptReviewMemo
Compile findings into a SummaryReview Memo, identifying primary
findingsandrecommendationsfor improvement
Task3: Model andOperationalAnalysisUpdates
Themodelupdateswill bebasedon the versionof the LATSmodelutilized
to developthe project
Confirm that the basetraffic demandmodel accuratelytakesinto trips
generatedby visitor traffic, masstransit traffic, and traffic demandfrom
Page 114 of 300
5 | Page
redevelopmentfrom existingislandparcels.
Updatethe modelbasedon findingsin Task2 and coordinationwith the
Townof Hilton Head
Expandthe model and study area to include the following signalized
intersectionsandmergepointseastof SpanishWellsRoad:
WilliamHilton Parkway (US278) mergewith CrossIslandParkway
WilliamHilton Parkway (US278Bus) at GumTreeRoad
WilliamHilton Parkway (US278Bus) at JarvisParkRoad
William Hilton Parkway (US278 Bus) at PembrokeDrive/Museum
Street
William Hilton Parkway (US278 Bus) at IndigoRunDrive/Whooping
CraneWay
PalmettoBayRoad (US278) at PointComfortRoad/Arrow Road
PalmettoBayRoadat TargetRoad
SeaPinesCircle - WilliamHiltonParkway (US278Bus) at PalmettoBay
Road
Expandthe model and study area to include the following signalized
intersectionsand mergepoints west of Bluffton ParkwayFlyoveron US
278:
US278 (FordingIslandRoad) at BuckinghamPlantationDrive/Moss
CreekDrive (on Mainland)
Bluffton Parkwayat BuckinghamPlantationDrive (on Mainland)
Existingtrafficcountsfor the studyareaintersectionswill beobtainedfrom
the Townof Hilton HeadIslandandSCDOT
Any additional counts not availablefrom the Town of Hilton Head or
SCDOTshall be collected by the consultant as deemed necessaryand
agreedto by the Town
Themodelshallincludemostrecentavailabletraffic datathat reflectsthe
toll removalon the CrossIslandParkway
The model shall include the new adaptive traffic signal management
systembeingdeployedby the Town (Summer2023)
Generate model outputs for study area with agreed upon new
assumptions and latest volumes and analyze operations in
Synchro/VISSIM. A keydeliverableof this project isa visualsimulationof
the modelswhichcanshowthe comparisonof the options
Evaluatehow AdaptiveTraffic Signalscould impact the traffic flow and
averagetravel times along the corridor at peak times as well as other
periods. TheTownandCountyareexpectedto implementAdaptiveSignals
on the William Hilton Parkway/US278 Corridor from I-95 to SeaPines
Circle. Answerquestionsrelatedto potentialfor downstreamimpacts
Evaluateopportunities to achieveoperationalefficiencyby maintaining
four lanes (two lanesin eachdirection) betweenthe WindmillHarborand
SquirePopeRoadintersectionswith WilliamHiltonParkway. Theseinclude
system improvementsthat result from Intelligent Traffic Systemsand
other operationaladjustmentsthat mayprovideimprovedefficiencyin the
Page 115 of 300
6 | Page
system
Coordinateand refine recommendationswith the Town of Hilton Head
IslandandBeaufortCounty
Participatein meetingsasdirectedby the Townof Hilton HeadIsland
Task4: ProposedIntersectionImprovements & PotentialFutureProjects
Evaluatethe safetyfor bicycleandpedestrianswithin the originalProject
Study Area from Moss CreekDrive to SpanishWells Road and make
recommendationson ways to improve the safety of the proposed
intersections.
Identify potential modificationsto the proposedintersectiondesignsof
the preferredalternativewithin the originalProjectStudyAreafrom Moss
Creekto SpanishWellsRoadthat deliver the same (or better) expected
operationallevel within the same (or smaller) footprint of the currently
plannedproject. Includeestimatedincreasedor decreasedcostsfor the
potentialmodificationsto the intersectiondesigns. Potentialmodifications
that increasethe projectfootprint andimpactsto the humanandnatural
environmentshouldbe excluded.
Basedon the findingsof Task3 for intersectionsoutside of the original
project study area, develop alternativesto improve operations in the
future.
Evaluationshouldincludetraffic improvements (LOS, delay, etc.) aswellas
anticipated project costs and known impacts or concerns with the
alternatives
Assumeup to 3 alternativesfor eachimpactedintersectionareevaluated
DevelopaSummaryof Recommendationsfor reviewbythe Townof Hilton
HeadandBeaufortCountythat canbeutilizedto securefuture fundingfor
the improvementsbeyondthe ProjectStudyArea
Task5: FinalReport
Compilemodelupdates, operationalanalysis, andfindingsinto areport for
a reviewanddiscussion.
Thereport shallcontaina detailedquantitative, objectivecomparisonof
alternativesincludingprosandconsof eachthat assessesthe conveyance
and capacity efficacy, safety improvements, community and social
impacts, environmentalimpacts, appearance/aestheticimpacts, andtotal
costs. Thiscomparisonshall be summarizedin a simpleto understand,
tabularformat.
Finalize elements into draft and final reports, including executive
summariesandrecommendations.
Presentationof final findingsto TownCouncilfor endorsement/adoption
Submit final report electronicallyfor endorsement/adoption by Town
Council.
All engineeringwork mustbe certifiedby a ProfessionalEngineer.
Page 116 of 300
7 | Page
TheanticipatedTableof Contentsfor the FinalReportisprovidedbelow.
Hilton HeadIsland IndependentReviewof the William Hilton ParkwayGateway
Corridor
Tableof Contents
1. ExecutiveSummaryandRecommendationsfor TownAction
2. Introduction
3. StudyObjectives
4. DataSourcesandNeeds
5. Modeling – ReviewandUpdating
a. DataSources
b. AssumptionsandMethodologies
6. RegulatoryandLegalImpacts
a. Town, CountyandStateRegulations
b. LegalImplications
7. AlternativeStrategiesfor TrafficMitigation
a. ScopeandExtents
b. CostEstimates
c. Schedule
8. Recommendations
9. Glossary - AcronymsandTerms
10. References
11. Listof FiguresandTables
12. Appendices
Page 117 of 300
8 | Page
III. SUBMITTALREQUIREMENTSANDFORMATTING
Offerorsare REQUIREDto submit all requestedinformation and/or documentation
outlined in this RFQ. AnyOfferor failingto do somayhavetheir responserejected
asbeingnon-responsiveandmakingthemineligiblefor contractaward. Offerormust
completeandreturn with their responsethe “Checklistof SubmittalRequirements”,
a copyof whichisincludedin thissolicitationasExhibitA. Offerorsshallsubmittheir
responsesin a format andsequencethat followsthe sectionnumberingandlayout
providedin this solicitationto assistthe Townin its evaluationof responses.
A. QUALIFICATIONSSUBMITTAL:
Section1 - Generalfirm backgroundandexperienceto includeat
a minimum:
Locationof primaryoperations/office (address) for work on
this projectandnumberof yearsat this location
Numberof yearsfirm hasperformedsimilarwork on
IndependentReviewof the WilliamHiltonParkwayGateway
Corridor;
Statethe total numberof similarprojectscompletedin the
last5 yearsandfor eachprovidewhetheryourfirm wasthe
primeor a subconsultant;
IdentifyExperience ________ – list all similarprojects
performed (projectname, year, location) in the last5 years
Providethe dollaramountof the contract/project;
Dateof the contractcompletion, the type(s) andquantityof
work;
Provideclient referenceinformationto includeclientname,
locationof the contractwork, andcontactperson’sname,
telephonenumberande-mailaddress.
Anyadditionalrelatedinformationdeemedpertinent.
Section2 - QualificationsandOrganizationof KeyPersonnel/ProjectTeam.
Provideat a minimum:
Provideanorganizationalchartof the teamthat will be
assignedfor the work on this contractwith a nameandrole
for eachprojectteammember, includingsupportpersonnel;
Aresumefor eachteammemberto beassignedto this
contract;
Theofficelocationfor eachteammemberto beassignedto
this contract.
Section3 - Summaryof firm’stechnicalcapabilitiesrelatedto the Scopeof
Workdescribedin SectionII. Identifyanyuniquequalifications,
tools, equipment, software, or methodologiesto be employed
underthis contract.
Section4 - Listof anylitigationhistoryof the firm for the past5 years
Page 118 of 300
9 | Page
Section5 - Anyadditionalrelevantinformationnot providedabove.
B. QUESTIONNAIRE
Offerorsshallcompletethe Questionnaireprovidedin ExhibitD.
C. REQUIREDFORMS
ExhibitA - Checklistof SubmittalRequirements
ExhibitC - IllegalImmigrationReformActAffidavit
Certificateof Insuranceasevidencethat Consultantmeetsthe
insurancerequirementsspecifiedin ExhibitBof this RFQ.
V. EVALUATIONCRITERIA
If acontractisawardedasresultof thissolicitation, suchawardshallbemadeto the
responsiveand responsibleOfferor with the highestrated responsebasedon the
statedevaluationcriteria.
EvaluationCriteria
1. Nature/Comparability/Quality of previouslycompletedcontracts/projects
of similarscope (40%):
2. Qualifications/abilities/experienceof personnel (50%)
3. Projectteam localexperience (SoutheastUSAtlantic coast ) (10%):
After initial scoringof the abovecriteria, the Town reservesthe right to selecta
short list of finalistsfor a presentation/interview. Resultsof the interview process
shallfactor into the final scoringfor contractaward.
VI. CONTRACTAWARD
If acontractisawardedasresultof thissolicitation, suchawardshallbemadeto the
mostqualifiedrespondent(s). In the eventthat contractnegotiationswith the most
qualified respondent(s) are unsuccessful, the Town reservesthe right to begin
contract negotiationswith next most qualified respondent(s). TheTownreserves
the right to awardmultiple contractsandanticipatesawardingto two firms.
Contractaward, aswellascontractcontinuationof the contractin subsequentfiscal
periods, is subject to availability of Town funds. In the event that contract
negotiationswith the highestratedOfferorareunsuccessful, the Townreservesthe
right to begincontractnegotiationswith nexthighestrated Offeror.
VII. STANDARDCONTRACTTERMSANDCONDITIONS
Page 119 of 300
10 | Page
Offeror acknowledgesit has read and understandsthe terms and conditions
providedin the Town’s standardcontractclausesattachedhereto asExhibitB, and
Offeroralsoagreesthat suchclausesshallsubstantiallyform the basisfor acontract
betweenOfferor and Town. Offeror alsoacknowledgesthat terms and conditions
providedin this RFQ, either in their entirety or relevantportions thereof, maybe
includedand becomepart of any resultingcontract. Theanticipatedterm of the
resultingcontractshallbe oneyearwith the option to amendasmutuallyagreed.
Page 120 of 300
EXHIBITA
RFQ2023-##
IndependentReviewof the William Hilton ParkwayGatewayCorridor
Checklistof SubmittalRequirements
Thefollowing checklistis intendedto advisethe Offeror of all items or information
that must be includedwith their submittal. Offerorsshallprovide:
1. CompletedSubmittalTransmittalPage (page1 of RFQ)
2. A QualificationsSubmittalthat addressesall the requiredelementsandformattingas
specifiedin this RFQ.
3. CompletedQuestionnaire (ExhibitD)
4. Copyof SCLicense
5. FeeSchedule (mustbe submittedseparatefrom the mainqualificationssubmittalof
qualifications)
6. SignedOfferorAcknowledgementon this ExhibitAbelow.
7. CompletedAffidavitacknowledgingthe requirementsof the SouthCarolinaIllegal
ImmigrationReformAct, ExhibitC.
8. Certificateof Insuranceasevidencethat Consultantmeetsthe insurancerequirements
specifiedin ExhibitBof this RFQ. Townof HiltonHeadIslandshallbe addedasan
AdditionalInsuredon Consultant’sInsuranceuponcontractaward.
9. OfferorshouldincludecurrentTownbusinesslicensewith their submittalif they have
one. If not, Offerorwill berequiredto obtainoneprior to commencinganywork if
awardedthe contract.
Offeror Acknowledgements:
In the spaceprovided, Offerorshallacknowledgereceiptandreviewof the following
addendumsissuedfor thissolicitation.
Addendum #’s: _______________________________________
I havereadthe abovechecklistof submittalrequirementsaswell asthis solicitationin
its entirety, andunderstandthat failureto submitanyitem, document, form or
informationidentifiedasbeingrequiredin either document, mayresultin the rejection
of our submittalandeliminateour companyfrom considerationfor contractaward.
Offeror/Firm:
Signature:
Name:
Title:
Page 121 of 300
EXHIBITB
STATEOFSOUTHCAROLINA )
AGREEMENT
COUNTYOFBEAUFORT )
THIS AGREEMENT (“Agreement”) is made this << Date>> between <<Company
Name>> (hereinaftercalled “Consultant") andthe Town of Hilton HeadIsland (hereinaftercalled
Town"), a municipal corporationorganizedand existing under the laws of the Stateof South
Carolina.
WHEREAS, theTownhasaneedfor aqualifiedconsultantto provideIndependentReview
of theWilliam Hilton ParkwayGatewayCorridor; and
WHEREAS, the Town andthe Consultantdesireto enterinto an Agreementwhereinthe
Consultantshallprovidesuchservicesassetforth hereinbelow.
NOW, THEREFORE, for andin considerationof themutualpromises, undertakingsand
covenantssetforth herein, thereceiptandsufficiencyof whichis acknowledgedandaffirmedby the
TownandtheConsultant, thepartiesheretoagreeasfollows:
1. The Consultantshall provideIndependentReviewof the William Hilton Parkway
GatewayCorridor in accordancewith thescopeof work attachedheretoasExhibit
andmadepartof thisAgreement.
2. Consultantshall be compensatedin accordancewith the itemized Fee Schedule
attachedheretoasExhibit __, andmadepartof this Agreement.
3. Thetermof this Agreementshallbefor aperiodof one (1) yearcommencingonthe
dateof execution.
4. The Consultantis requiredto maintain appropriatelevels of insurancefor both
workerscompensationcoverageandfor autoliability. TheConsultantis requiredto
maintain one million dollars ($1,000,000) of generalliability insuranceand one
million dollars ($1,000,000) of professionalliability insurance. TheConsultantmust
provide the Town with a Certificate of Insuranceevidencingthat they havethe
requiredinsurancecoverages. The Town shall be namedasan additionalinsured
with respectto liability coverages. TheConsultantis requiredto immediatelycontact
the Town should any changeto thesepolicies occur during the courseof the
performanceof this contract. Failure to maintain thesepolicies is groundsfor
termination.
5. Termination.
5.1 TheTownmayterminatethis Agreementin wholeor in partat anytime for
theconvenienceof theTown by deliveryof a written noticeto theConsultantof
theTown's electionto terminatethis Agreementfor theconvenienceof theTown.
If this Agreementis terminatedfor the convenienceof the Town, the Town will
pay the Consultantonly for thoseservicesrenderedby the Consultantup to the
dateof termination, basedon theexistingratesof this Agreement, andproratedto
thedateof termination.
Page 122 of 300
EXHIBITB
5.2 TheTownmayalsoterminatethis Agreementif fundsarenotappropriatedor
otherwisemadeavailableto supportcontinuationof this Agreementin subsequent
fiscal years. In suchevent, theTownshalldeliverawrittennoticeto theConsultant
thatthisAgreementis terminatedeffectivethelastdayof thethencurrentfiscalyear
dueto the lack of appropriatedfunds, andthe Town will pay the Consultantonly
throughtheendof thethencurrentfiscalyearattheexistingratesin thisAgreement.
6. Shouldany part of this Agreementbe renderedvoid, invalid, or unenforceableby
any court of law, such a determination shall not render void, invalid, or
unenforceableanyotherpartof this Agreement.
7. This Agreementhasbeenmadeandenteredinto in theStateof SouthCarolina, and
the laws of South Carolina shall govern the validity and interpretationof this
Agreementin theperformanceduehereunder.
8. This Agreementmay not be modified unlesssuchmodification is in writing and
signedby bothparties.
9. TheConsultantmaynotassignthis Agreementwithouttheprior writtenapprovalof
theTown.
10. The Consultantshall defend, indemnify, andhold harmlessthe Town, its officers,
directors, agents, andemployeesfrom andagainstanyandall actions, costs, claims,
losses, expenses, and/or damages, includingattorney’s fees, whetherincurredprior
to theinstitutionof litigation, duringlitigation, oronappealarisingoutof orresulting
from the conduct of any activity herebyauthorizedor the performanceof any
requirementimposedpursuantby this Agreement, howevercausedor occasioned,
unlesscausedby thewillful misconductor grossnegligenceof theTown.
11. The parties hereto intend that no master/servant, employer/employee, or
principal/agentrelationshipwill be createdby this Agreement. Nothing contained
hereincreatesanyrelationshipbetweentheTownandtheConsultantotherthanthat
which is expresslystatedherein. The Town is interestedonly in the resultsto be
achievedunder this Agreement, and the conductand control of the agentsand
employeesof theConsultantandthemethodsutilizedby theConsultantin fulfilling
its obligationshereundershalllie solelyandexclusivelywith theConsultantandits
agentsandemployeesshallnot beconsideredagentsor employeesof theTown for
anypurpose. No personemployedby theConsultantshallhaveanybenefits, status,
or right of employmentwith theTown.
12. The Consultant, by signing this Agreement, herebycertifiesthat Consultantshall
comply with all applicablerequirementsof theSouthCarolinaIllegal Immigration
ReformAct, S.C. CodeAnn. §41-8-10 (2007) etseq., (the "Act"), andthatConsultant
covenantsandagreesasfollows:
12.1. Consultantshallnotknowinglyorintentionallyemployanyunauthorizedalien
and, unlessexcludedfrom coverageof the "Act", shallverify thework authorization
of newlyhiredemployeesperformingwork undertheAgreementby registeringand
participatingin the FederalWork AuthorizationProgram (E- verify) andverifying
thework authorizationof everynewhiredemployeewithin three (3) businessdays
afteremployingemployee.
Page 123 of 300
EXHIBITB
12.2. Consultantagreesto provideto theTownall documentationrequestedby it to
establisheither:
a) theapplicabilityof theSouthCarolinaIllegal ImmigrationReformAct to
Consultant; or
b) compliancewith the SouthCarolinaIllegal ImmigrationReformAct by
Consultant.
12.3. Consultantagreesto includein anycontractswith its sub-consultantslanguage
requiringits sub-consultantsto:
a) comply with the applicablerequirementsof Title 8, Chapter14 of the
SouthCarolinaCodeof Laws; and
b) includein their contractswith thesub-subconsultantslanguagerequiring
thesub-subconsultantsto complywith theapplicablerequirementsof Title 8,
Chapter14 of theSouthCarolinaCodeof Laws.
12.4. Consultantacknowledgesandagreesthatit shallcomplywith requirementsof
theImmigrationReformandControlAct of 1986includingthenon-discrimination
provisionsthereof, andshallcompleteall requiredI-9 documentationfor all workers
employedby it.
12.5. Consultantcertifiesit shallcomplywith all state, federal, andlocallaws, rules,
regulationsandordersapplicableto it in performanceof work underthecontract.
IN WITNESSWHEREOF, thepartiesheretohaveaffixedtheirsignaturesheretothe
datefirst written hereinabove.
WITNESSES: << CONSULTANT’S FULL NAME>>
By:
Its:
WITNESSES: TOWNOFHILTON HEADISLAND
By:
Marc Orlando
Its: Town Manager
Page 124 of 300
EXHIBITC
CONSULTANTAFFIDAVIT
SOUTHCAROLINA ILLEGAL IMMIGRATION REFORMACT
In accordancewith therequirementsof theSouthCarolinaIllegal ImmigrationReformAct,
Consultant") herebycertifiesthatit is currentlyin compliancewith
the requirementsof Title 8, Chapter14 of the South Carolina Code Annotatedand will remain in
compliancewith suchrequirementsthroughoutthetermof its contractwith theTownof Hilton HeadIsland,
SouthCarolina
TheConsultantherebyacknowledgesthatin orderto complywith requirementsof S. C. CodeAnnotated
Section8-14-20(B), it will registerandparticipatein thefederalwork authorizationprogram (E-verify) to
verify theemploymentauthorizationof all newemployees; andrequireagreementfrom its subconsultants,
andthroughthesubconsultants, thesub-subconsultants, to registerandparticipatein thefederalverification
employmentauthorizationof all newemployees.
The Consultantagreesto provide to the Town of Hilton HeadIsland upon requestany documentation
required to establishthe applicability of the South Carolina Illegal Immigration Reform Act to the
consultant, subconsultantor sub-subconsultant. The Consultantfurther agreesthat it will, uponrequest,
providetheTown of Hilton HeadIslandwith anydocumentationrequiredto establishthattheconsultant
andanysubconsultantsor sub-subconsultantsarein compliancewith therequirementsof Title 8, Chapter
14of theS. C. CodeAnnotated.
Date: _______________________ By: ____________________________________
Name: _____________________________________
Title: _____________________________________
Page 125 of 300
Construction
By signingits bid or proposal, Consultantcertifiesthatit will complywith theapplicablerequirements
of Title 8, Chapter14of theSouthCarolinaCodeof Lawsandagreesto provideto theTownof Hilton
HeadIslanduponrequestanydocumentationrequiredto establisheither: (a) thatTitle 8, Chapter14is
inapplicablebothto Consultantandits subconsultantsor sub-subconsultants; or (b) thatConsultantand
its subconsultantsorsub-subconsultantsarein compliancewith Title 8, Chapter14. Pursuantto Section
8-14-60, "A personwho knowingly makesor files any false, fictitious, or fraudulent document,
statement, or reportpursuantto this chapteris guilty of a felony, and, uponconviction, mustbefined
within thediscretionof thecourtorimprisonedfor notmorethanfive years, orboth." Consultantagrees
to includein anycontractswith its subconsultantslanguagerequiringits subconsultantsto (a) comply
with theapplicablerequirementsof Title 8, Chapter14, and (b) includein their contractswith thesub-
subconsultantslanguagerequiringthesub-subconsultantsto complywith theapplicablerequirements
of Title 8, Chapter14.
Non-Construction
By signingyour offer, you certify that you will comply with the applicablerequirementsof Title 8,
Chapter14of theSouthCarolinaCodeof Lawsandagreeto provideto theTownof Hilton HeadIsland
uponrequestanydocumentationrequiredto establisheither: (a) thatTitle 8, Chapter14is inapplicable
to you andyour subconsultantsor sub-subconsultants; or (b) thatyou andyour subconsultantsor sub-
subconsultantsarein compliancewith Title 8, Chapter14. Pursuantto Section8-14-60, "A personwho
knowingly makesor files anyfalse, fictitious, or fraudulentdocument, statement, or reportpursuantto
this chapteris guilty of a felony, and, uponconviction, mustbefined within thediscretionof thecourt
or imprisonedfor not morethanfive years, or both." You agreeto includein anycontractswith your
subconsultantslanguagerequiringyour subconsultantsto (a) complywith theapplicablerequirements
of Title 8, Chapter14, and (b) includein theircontractswith thesub-subconsultantslanguagerequiring
thesub-subconsultantsto complywith theapplicablerequirementsof Title 8, Chapter14.
Page 126 of 300
EXHIBITD
1
TOWNOF HILTON HEAD ISLAND
RFQ 2023-##
QUESTIONNAIRE - INDEPENDENT REVIEW OF THE WILLIAM HILTON PARKWAYGATEWAY
CORRIDOR
INSTRUCTIONSFORCOMPLETIONOFTHE QUESTIONNAIRE
PleasereadtheenclosedQuestionnairecarefully. “Thefirm” referredto in this Questionnaireis thebusinessentity
offering qualificationsfor thereferencedprojectfor theTown. DO NOT leaveanyquestionsunanswered, norOMIT
anyrequiredsignatures. All questionsmustbeanswered. If thereis truly a questionthatdoesnotapply, pleaseenter
Not Applicable" or "N/A".
In theeventadditionalspaceis requiredto completeananswer, youmaysupplementwith additionalpagesthatshallbe
securelyattachedto this Questionnaire. If informationis providedon othertypedor preprintedsheets, theymustinclude
all therequestedinformation, beproperlyreferenced, andsecurelyattachedto this Questionnaire. Saidsupplementsor
attachmentsshallbeconsidereda partof this Affidavit andits oath.
BeginQuestionnairebelow
NOTE: In orderfor theresponseto beconsidered, it is necessaryfor anauthorizedindividual of
thefirm, andon behalfof thefirm, to furnishtheinformationrequestedbelow.
DatePrepared:
SubmittedTo: Townof Hilton HeadIsland. ATTN: EngineeringDivision, OneTownCenter
Court, Hilton HeadIsland, SC29928.
SubmittedBy:
CompleteFirm Name: Must bethesameasonSubmittalTransmittalPage)
CompleteStreetAddressandSuiteNumber, if applicable)
P. O. Box Number, if applicable) (Zip Codefor P. O. Box Number)
City) (County) (State) (Zip Codefor StreetAddress)
TelephoneNumber: ( )
FaxNumber: ( )
FederalEmployerIdentificationNumber:
Page 127 of 300
2
1. How is thefirm presentlyorganized? (I.e. Corporation, Company, Partnership, Sole
Proprietorship, etc.)
2. Dateof Organization:
3. OrganizedundertheLawsof whichState?
4. DateCommencedBusiness:
5. If thefirm is acorporation, is it registeredwith theSecretaryof State, to do businessin South
Carolina? If yes, give dateof Certificateof Existenceor Authority.
6. If thefirm is acorporationnotorganizedunderthelawsof SouthCarolina, providethe
completenameandaddressof its RegisteredAgentin SouthCarolina.
7. Is thefirm licensedwith SouthCarolinaStateBoardof Registrationfor Professional
Engineers? LicenseNumber:
8. How manyyearshasthefirm beenin businessunderthepresentname?
9. Whatis thelocationof thebaseof operations?
10. How manyyearshasthefirm beenat thislocation?
11. How manyyearshasthefirm hadTransportationEngineeringrelatedservices?
12. List thepresentofficersof thefirm andtheirtitles:
Page 128 of 300
3
13. Indicatebelowtheexperienceof key individualsandtechnicalsupportpresentlyemployedby
thefirm who will work on Townprojects. Pleaseattachresumesandanorganizationalchart.
Individual' s
Name
Licenseor
Cert.
Present
Position
Years
Employed By
The Firm
Yearsof
Experience
In What
Capacity
14. Providea summaryof technicalcapabilitiesandexperiencerelatedto theanticipated
servicesandtasksbulletedin theRFQ (addspaceif necessary):
Sea
Flood
Page 129 of 300
4
Page 130 of 300
5
15. List recentlycompleted, similar projects/contractspreferablyrelatingto major
roadway/parkwaycorridoranalysisanddesign (addspaceif necessary):
Contract
Amount
Project Nameand
Type of Work
Date
Completed
ReferenceName, Address, &
PhoneNumber
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Page 131 of 300
6
16. Identify anyuniquequalifications, abilities, tools, equipment, software, or methodologiesused
by thefirm.
17. Theindividualslistedbelowareauthorizedto approve, signand/or executeonthefirm’s
behalf, thefollowing documents:
DocumentCodeNos.: 1 - Organization's Statementof ExperienceandEquipment.
2 - ProposalsandContracts
3 - ChangeOrder(s)/SupplementalAgreement(s)
NAME TITLE DOCUMENT
CODE NO.
Page 132 of 300
7
It is thesoleresponsibilityof thesubmittingfirm to notify theTownof anychangesto thislist, post
preparationdate. Notification shallbeby certifiedoriginaldocuments.
18. Hasthefirm, its parentor subsidiaryeverbeensuspended, disqualified, or debarredby any
Municipality, Stateor theFederalGovernment? If yes, provide complete
details, includingwhen, whereandwhy.
Page 133 of 300
8
19. Has any owner, stockholder, officer, partner, or employee(s) of the firm beensuspended,
disqualified, or debarredfrom doingbusinessby SouthCarolina, anyotherStateor theFederal
Government? If yes, providecompletedetails, includingwhen, whereandwhy.
20. Haveyou or any of the individualsor entitiesreferredto above, in the pastsix years, been
indicted, pledguilty, plednolo contendere, or beenconvictedof embezzlement, theft, forgery,
bribery, receivingstolenproperty, or anyotheroffenseindicatinga lack of businessintegrity,
or businesshonestywhich seriouslyanddirectlyaffectsthequestionof presentresponsibility
asa consultantin anyjurisdictionin theUnitedStates?
details.
If yes, givecomplete
Page 134 of 300
9
21. Hasthe firm, its subsidiaries, affiliates or parentcompanieseverdefaultedon a contractwith
anyLocal, Stateor FederalGovernment? If yes, givecompletedetails.
22. List thefirm's subsidiaries, affiliatesandparentcompanies.
23. Is the firm herein offering the submittal, including owners, corporate officers or
stockholders, either collectively or individually, currently suspended, disqualified or
debarredfrom doingbusinesswith anyLocal, Stateor with theFederalGovernment? If so,
list theagencyandcircumstance.
AFFIDAVIT
BEINGDULY SWORNDEPOSESAND SAYS
THAT HE/SHE IS AUTHORIZED TO EXECUTE THIS AFFIDAVIT FOR AND ON
BEHALF OF THE APPLICANT FIRM, AND THE ANSWERS TO THE FOREGOING
QUESTIONS AND ALL STATEMENTS HEREIN CONTAINED ARE TRUE AND
CORRECTTO THE BESTOFHIS/HERKNOWLEDGE.
Swornandsubscribedto before meon
this dayof ( Nameof ApplicantFirm)
Page 135 of 300
10
AuthorizedSignature)
NotaryPublic) ( Print or TypeName)
Not anOfficer of thefirm)
Title)
AFFIX
CORPO
RATE
SEAL
HERE
NOTICE: THE TOWN MUST BE NOTIFIED OFANY SIGNIFICANT CHANGE IN THE INFORMATION
FURNISHEDIN THIS QUESTIONNAIREWITHIN FIFTEEN (15) DAYS OFTHE OCCURRENCEOFSUCH
CHANGE.
Page 136 of 300
EXHIBIT B
INDEPENDENT STUDY OF THE WILLIAM HILTON PARKWAY GATEWAY CORRIDOR
SCOPE OF WORK
1. The Consultant shall conduct an Independent Study of the William Hilton
Parkway Gateway Corridor project. It is the intent of the Town to have the
Consultant review and verify that the assumptions, methodologies, alternatives
and preferred design recommendations are technically accurate and serve the
best interest of Hilton Head Island. The Consultant shall take a fresh look at the
project and test possible new alternative solutions over the project scope. The
Consultant is strongly encouraged to develop their own ideas and recommend
their own alternatives.
2. Proposed plans will have to pass NEPA review Thus, the Consultant should have
a familiarity with that process and its applicability to this project. It should be
noted that, in addition to environmental impacts, Federal Highway
Administration (FHWA) considers safety as a prime issue in its evaluation. Also, a
demonstrated solution of the congestion problem over the project scope above
is essential. Thus, plans that deal with these issues have a higher probability of
success in the NEPA and community review.
3. The study is anticipated to take no longer than six (6) months to complete.
Anticipated services and tasks associated with the development of the plan may
include, but are not limited to, the following:
Task 1: Project Initiation and Coordination:
• Initial meeting with Town of Hilton Head Island and Independent
Consultant.
• Conduct Bi-weekly project status meetings with Town staff and the project
advisory committee.
• Review meeting with representatives of Town of Hilton Head Island,
SCOOT and the existing design consultants on prior work performed
• Monthly update meetings with Town Manager.
• Review and define the study area.
• Perform a site visit/field review.
• Review and understand bridge inspection data.
• Understand the Town of Hilton Head Island's and Community concern with
the proposed concept and existing model.
• Study existing project reports including: the SCOOT Draft Environmental
Assessment, Town Council recommendations supported by MKSK and HOR
studies, and the Technical Working Group report dated 3/31/23 to
FHWA/Council on Environmental Quality/SCOOT.
Task 2: Provide Modeling of Data and Recommended Design Concepts
Page 137 of 300
EXHIBIT B
• Review assumptions contained within the model - Daily, Hour, Land Use,
and identify other input variables, including adaptive traffic signals and
safety provisions.
The results of each alternative evaluated should include but not be limited
by the following:
Throughput and Traffic Simulation
This includes factors such as end-end delay, level of service, and average
speed. We wish to see these computed via event simulation from end-to
end in each direction (for each alternative) including modeling the coupling
and interactions of all proposed traffic lights, merges, splits, and other
possible constrictions, as opposed to summing them as acting individually.
The simulation must operate on the smallest interval possible to provide
meaningful results.
Costs
Since detailed engineering for the various Corridor options is not available
at this point, the Consultant shall use broad-gauge cost estimates similar
to those used by SCDOT. The Consultant shall solicit assistance from SCOOT,
the County, and the Town in developing cost estimates for the various
options and identifying the split between covered and uncovered costs.
Safety, Environmental and Community Impacts
• Review data collection approach and study area.
• Review model outputs and subsequent recommendations for
intersection operations and bridge concepts.
• Model Review and Concept Review Memo.
• Compile findings into a Summary Review Memo, identifying
primary findings and recommendations for improvement.
• Review data collection from Adaptive Traffic Signals.
Task 3: Model and Operational Analysis Updates
• The model updates will be based on the version of the Lowcountry Area
Transportation Study (LATS) model utilized to develop the project.
Consultant to study and recommend a model alternative if warranted.
• Provide simulation and modeling of various data.
• Confirm that the base traffic demand model accurately takes into account
trips generated by visitor traffic, workforce traffic, mass transit traffic, and
traffic demand from redevelopment from existing island parcels.
• Update the model based on findings in Task 2 and coordination with the
Town of Hilton Head.
• Expand the SCOOT project model and study area to include the following
signalized intersections and merge points east of Spanish Wells Road:
• William Hilton Parkway (US 278) merge with Cross Island Parkway.
Page 138 of 300
EXHIBIT B
• William Hilton Parkway (US 278 Bus} at Gum Tree Road.
• William Hilton Parkway (US 278 Bus) at Jarvis Park Road / Wilborn
Road.
• William Hilton Parkway (US 278 Bus} at Pembroke Drive/Museum
Street.
• William Hilton Parkway (US 278 Bus} at Indigo Run Drive/Whooping
Crane Way.
• Palmetto Bay Road (US 278) at Point Comfort Road/Arrow Road.
• Palmetto Bay Road at Target Road.
• Sea Pines Circle - William Hilton Parkway (US 278 Bus) at Palmetto Bay
Road.
• Expand the model and study area to include the following signalized
intersections and merge points west of Bluffton Parkway Flyover on US
278:
• US 278 (Fording Island Road) at Buckingham Plantation Drive/Moss
Creek Drive (on Mainland).
• Bluffton Parkway at Buckingham Plantation Drive (on Mainland)
• Existing traffic counts for the study area intersections will be obtained from
the Town of Hilton Head Island and SCOOT
Any additional counts not available from the Town of Hilton Head Island or
SCOOT shall be collected by the Consultant as deemed necessary and
agreed to by the Town.
• The model shall include the most recent available traffic data that reflects
the toll removal on the Cross Island Parkway.
• The model shall include the new adaptive traffic signal management
system being deployed by the Town (Summer 2023}.
• Generate model outputs for study area with agreed upon new
assumptions and latest volumes and analyze operations using appropriate
tools. A key deliverable of this project is a visual simulation of the models
which can show the comparison of the options.
• Evaluate how Adaptive Traffic Signals could impact the traffic flow and
average travel times along the corridor at peak times as well as other
periods. The Town and County are expected to implement Adaptive Signals
on the William Hilton Parkway/US 278 Corridor from 1-95 to Sea Pines
Circle. Answer questions related to potential for downstream impacts. •
• Evaluate opportunities to achieve desired operational efficiency by
maintaining four lanes (two lanes in each direction) between the Windmill
Harbor and Squire Pope Road intersections with William Hilton Parkway.
These include system improvements that result from Intelligent Traffic
Systems and other operational adjustments that may provide improved
efficiency in the system.
• Evaluate impacts of alternatives, including those impacts to the Traditional
Cultural Property defined in the Environmental Assessment, and
commonly referred to as the Stoney Community. Develop strategic options
for consideration to mitigate impacts.
Page 139 of 300
EXHIBIT B
• Evaluate the safety for bicycle and pedestrians within the original Project
Study Area.
• Coordinate and refine recommendations with the Town of Hilton Head
Island.
• Participate in meetings as directed by the Town of Hilton Head Island.
Task 4: Proposed Intersection Improvements and other important elements:
• Evaluate the safety for bicycle and pedestrians within the original Project
Study Area including new signal proposed at Windmill Harbour.
• Evaluate vehicular safety of the Project and make cost-effective
recommendations to reduce accidents and enhance safety for the
motoring public including emergency response considerations.
• Identify potential modifications to the proposed intersection designs of
the preferred alternative within the original Project Study Area from Moss
Creek to Spanish Wells Road that deliver the same (or better) expected
operational levels.
• Based on the findings of Task 3 for intersections outside of the original
project study area, develop alternatives to improve operations in the
future. Evaluation should include but not be limited to traffic conveyance
and capacity improvements (LOS, delay, etc.) as well as anticipated project
costs and known impacts or concerns with the alternatives
• Evaluate, quantify, and explain the Project's impacts on the Stoney
Community.
• Develop a Summary of Findings and Recommendations for review by the
Town of Hilton Head that can be utilized to secure future funding for the
improvements beyond the Project Study Area.
Task 5: Final Report
• Compile model updates, operational analysis, and findings into a report for
a review and discussion.
• Integrate safety objectives based on the results of data and analysis into
findings and recommendations.
• The report shall contain a detailed quantitative, objective comparison of
alternatives including pros and cons of each that assesses the conveyance
and capacity efficacy, safety improvements, community and social
impacts, environmental impacts, appearance/aesthetic impacts, and total
costs. This comparison shall be summarized in a simple to understand,
tabular format as agreed to by the Town.
• Finalize elements into draft and final reports, including executive
summaries and recommendations.
• Presentation of study, with final findings and recommendations, to Town
Council for endorsement/adoption.
• Submit final report electronically for endorsement/adoption by Town
Page 140 of 300
EXHIBIT B
Council.
• All engineering work must be certified by a Professional Engineer licensed
in South Carolina.
Page 141 of 300
Independent Study of WHP Gateway Corridor
Summary of Submitted Memorandums
Hilton Head Island, South Carolina
Prepared for:
Town of Hilton Head Island
1 Town Center Court
Hilton Head Island, South Carolina
843.341.4600
Prepared by:
Lochmueller Group
Huntington Tower, 201 W Springfield Avenue
Suite 1012
Champaign, Illinois 61820
217 .673 .7633
JUNE 10, 2024
Page 142 of 300
P A G E | i
Independent Study of WHP Gateway Corridor
Summary of Submitted Memorandums
Table of Contents
Executive Summary ....................................................................................................................................... ii
Four Lane Viability Memorandum (Task 1.3.3) ............................................................................................. 3
SCDOT Seismic Study Review Findings Memorandum (Task 1.8) ................................................................. 9
Traffic Forecasting Memorandum (Task 2.3) .............................................................................................. 12
Corridor Alternatives Analysis Memorandum (Task 3.6) ............................................................................ 21
Downstream Impacts to Task 4 Intersections Memorandum (Interim Task 4.4) ..................................... 115
Response to Advisory Committee Desire to Fully Evaluate Southern Bypass Alternative (Deliverable not
included in Original Scope of Services ...................................................................................................... 115
1
7
25
34
137
148
Page 143 of 300
P A G E | ii
Independent Study of WHP Gateway Corridor
Summary of Submitted Memorandums
Executive Summary
Lochmueller Group (Lochmueller) is preparing an independent study that evaluates congestion and
mobility challenges along the William Hilton Parkway (WHP) Gateway Corridor. The intention of this
memorandum is to provide the Town of Hilton Head Island with each of the memorandums completed as
of June 10, 2024 by Lochmueller throughout the course of the project in one document. It should be noted
that the memorandums are provided in order as they appear in the scope of services, rather than by
submission date. In addition to the mem orandums completed as part of the scope of service s,
Lochmueller prepared a memorandum responding to the Advisory Committee’s desire to fully evaluate
the southern bypass alternative which has also been provided in this comprehensive summary of
submitted memorandums.
Page 144 of 300
P A G E | 1
Independent Study of WHP Gateway Corridor
Summary of Submitted Memorandums
Four Lane Viability Memorandum (Task 1.3.3)
Page 145 of 300
MEMO
Huntington Tower, 201 W Springfield Avenue, Suite 1012
Champaign, Illinois 61820
PHONE: 217.673.7633
To: Town of Hilton Head, South Carolina
From: Lochmueller Group
Date: May 3, 2024
Subject: Independent Study of the William Hilton Parkway Gat eway Corridor
Four Lane Viability Review Technical Memorandum – T ask 1.3.3
Lochmueller Group (Lochmueller) is preparing an ind ependent study that evaluates congestion and
mobility challenges along the William Hilton Parkwa y Gateway Corridor. As part of this independent
study, Lochmueller evaluated the viability of sever al strategies in order to determine if they should be
included or excluded from further consideration as part of this project. These items include the viabi lity of
maintaining four lanes along William Hilton Parkway (US 278) between Windmill Harbour and Squire Pope
Road; the implementation of a second bridge; modifi cations to the existing mass transit system;
implementation of a new ferry system; and the imple mentation of a facility usage fee. It should be not ed
that an in-depth detailed analysis of any of these items was excluded from the scope of work.
The intention of this memorandum is to provide the Town of Hilton Head with Lochmueller’s professional
opinion regarding the feasibility of William Hilton Parkway being able to remain a four lane facility within
areas between Moss Creek Drive and Squire Pope Road , if one or more of these strategies were
implemented.
Viability of Maintaining Four Lanes Between
Windmill Harbour and Squire Pope Road
Lochmueller evaluated the viability of maintaining four lanes between Windmill Harbour and Squire Pope
Road. Currently, the intersection of Squire Pope Ro ad and US 278 experiences significant congestion,
specifically during the PM peak hour. The westbound approach has failing conditions and queues which
extend 2,500 feet from Squire Pope past Spanish Wells. This congestion is expected to be exacerbated by
2045 with the forecasted growth.
Travel times were calculated using VISSIM, which is a microsimulation tool that accurately replicates
individual vehicles and their interactions within c omplex traffic streams, such as interchanges, freew ays,
and expressway corridors with signalized intersecti ons. A robust amount of data and field observations
were conducted to calibrate VISSIM to reproduce fie ld conditions.
The travel time results are provided in Table 1. As shown, it currently takes approximately 19 minute s to
travel along US 278 between Moss Creek Drive and Indig o Run Drive during the AM peak hour, and it
takes approximately 21 minutes to travel along US 278 b etween Indigo Run Drive and Moss Creek Drive
during the PM peak hour today.
US 278 between Moss Creek Drive and Indigo Run Drive i s approximately 8.2 miles. Based on the travel
times, the existing average speed along this corridor is 26 miles per hour (mph) during the AM peak hour
and 23 mph during the PM peak hour. This is well belo w the posted speed limits of 45 mph and 55 mph
along the corridor.
Page 146 of 300
May 3, 2024
Page 2
These travel times are expected to increase by appr oximately 36% during the AM peak hour and by
approximately 23% during the PM peak hour in the year 2045 with the anticipated background growth. It
is evident based on the travel times that the exist ing four-lane section already struggles to accommod ate
the 2023 traffic volumes, and the 2045 forecasted traffic v olumes would be expected to significantly
deteriorate operating conditions along the corridor .
TABLE 1. VISSIM 2023 EXISTING AND 2045 NO BUILD TRAVEL TIME RESULTS
Corridor
2023 Existing
Simulated travel
time (secs)
2045 No Build
Simulated travel
time (secs)
% Difference
AM PM AM PM AM PM
William Hilton Parkway between
Moss Creek and Indigo Run
EB 1157 619 1579 642 36.47% 3.72%
WB 572 1252 584 1544 2.10% 23.32%
A preliminary analysis was completed in an effort t o determine how much the 2023 existing and 2045 no
build traffic volumes would need to be reduced in o rder for the existing four-lane section to operate
acceptably. It was determined that the 2023 existing tr affic volumes would need to be reduced by
approximately 30% for the current four-lane configura tion to operate acceptably. Furthermore, based on
an annual growth rate of 0.56%, the 2045 traffic volumes w ould need to be reduced by approximately
40% for the current four-lane configuration to operat e acceptably.
Implementation of a Second Bridge
Lochmueller was asked to evaluate the implementatio n of a second bridge and/or point of access onto
Hilton Head Island from the mainland. It is Lochmue ller’s understanding that a second bridge or point of
access has been discussed locally to address conges tion along US 278. A new bridge could take up to
twenty years to come to fruition once all studies, planning, environmental, design, and construction i s
complete.
While there are clear benefits to providing a secon d bridge, such as redundancy, the operating conditi ons
along US 278 are already congested today. As previousl y stated, the 2023 existing traffic volumes would
need to be reduced by approximately 30% and the 2045 tr affic volumes would need to be reduced by
approximately 40% for the current four-lane configura tion to operate acceptably. Given the congestion
already experienced along this corridor today and t he time it would take to construct a second bridge, it is
our opinion that a six-lane section of US 278 onto Hil ton Head Island is needed independently of a second
bridge.
Modifications to Existing Transit System
Lochmueller evaluated whether modifications to the existing mass transit system and its services, or t he
implementation of a new mass transit system, could provide enough benefit to maintain the needed
levels of efficiency and operations of a four-lane section between Windmill Harbour and Squire Pope
Road.
Page 147 of 300
May 3, 2024
Page 3
Based on data provided by the Lowcountry Regional T ransportation Authority (LRTA), transit service in the
region has been on the decline. It should be noted that the transit service does show signs of rebound ing;
however, it remains to be seen what the new normal or equilibrium state may mean and if this is
sustainable and long lasting for passenger volumes as transit agencies struggle with driver shortages,
funding gaps and other operational challenges.
The following ridership data was provided from the LRTA:
• The Palmetto Breeze commuter bus’s yearly unlinked trips peaked in 2019 at 196,978
• Trips declined to 129,160 in 2021 (post pandemic)
• Trips increased by 4.45% to 134,916 in 2022 according to the Federal Transit Administration
(FTA) National Transit Database (NTD) data
The transit service in the region is fragmented by service area and type (commuter/worker,
worker/tourist) and serves different markets with l imited coordination. According to the LRTA, they
currently have 72,963 yearly unlinked trips or 201 unlinke d trips daily across all the routes that serve
Hilton Head, with 363 service days and one AM and PM t rip respectively. The Breeze Trolley, a seasonal
service had 34,600 unlinked trips (2023) across 143 service d ays or 242 trips per day with 18 daily runs
Sunday to Thursday and 20 runs on Friday and Saturday . The trolley runs April through Labor Day from 1
PM to 10 PM daily, with extended service to 11 PM Frida y and Saturday.
There is an on-demand van service countywide with t rips to Hilton Head. However, the ridership is
unknown, and a 24 hour prior reservation is needed to make a trip. The is also a Beach Parking shuttle
which operates 47 days per year from 10 AM to 4:30 PM on Friday, Saturday, Sunday and holidays from
Memorial Day to Labor Day, with 3,980 riders (2023).
The fixed route Breeze transit option, as currently structured, only largely addresses the employment side
to/from the island, and the trolley partially addre sses trips of visitors, residents and likely some workers
once they are on the island. The Breeze service doe s provide long distance routes. The on-island troll ey is
seasonal and has limited service hours. Overall, th ere is little coordination between the transit serv ice
types (commuter bus and trolley/shuttle), and there is service gap from Labor Day to April when the
trolley does not currently run.
Based upon Lochmueller’s evaluations, it appears tr ansit across all services currently only provides a
fraction of the total regional trip making to and f rom, and on, the island. In the future, transit would need
to be more robust in terms of service span (number of trips daily and days per year of service) and
coordinated to be most effective, with some sort of travel time advantage and way to address the last
mile distribution once passengers are on the island .
As described in the preceding sections of this memo randum, the 2023 existing traffic volumes would need
to be reduced by approximately 30% and the 2045 traffic volumes would need to be reduced by
approximately 40% for the current 4-lane configuratio n to operate acceptably. By comparison, in 2021,
the transit mode share was less than 1% in the regi on
1 , and would therefore have to grow exponentially
to be effective enough to reduce the need for six l anes along US 278 in the area under study.
1 https://datausa.io/profile/geo/hilton-head-island- bluffton-towns-beaufort-city-puma-sc#housing
Page 148 of 300
May 3, 2024
Page 4
Therefore, it is Lochmueller’s opinion that even if significant modifications were made to the existin g
Palmetto Breeze transit system, it would be highly unlikely these modifications alone could account fo r
enough trips and the mode share percentage needed t o sufficiently reduce the number of trips across th e
US 278 bridges, such that a four-lane facility could b e maintained.
Ferry System/Facility Usage Fee
In addition to expanding the existing mass transit system, Lochmueller evaluated whether the
implementation of a new ferry system or the impleme ntation of a facility usage fee, also commonly
known as congestion pricing, would provide enough b enefit to maintain the existing four-lane section
across the US 278 bridges and/or between Windmill Har bour and Squire Pope Road.
In regard to the implementation of a new ferry system, it is our understanding that during the
development of the 2045 Lowcountry Area Transportation Study (LATS) Long Range Transportation Plan
(LRTP), long-term transit considerations were discu ssed with the public and stakeholders. One of these
considerations included implementing high-speed fer ry services between Hilton Head Island and Beaufort
or Port Royal to the north, and Savannah or Tybee I sland to the south.
It should be noted, however, that no formal studies have been initiated by the LATS Policy Committee o r
other governing bodies to determine the feasibility of implementing and/or maintaining a high-speed
ferry system to/from Hilton Head Island. Therefore, it is reasonable to assume that a high speed ferry
system to/from Hilton Head Island would not be full y operational within the next ten to fifteen years.
If/when a new ferry system is implemented, it is highly unlikely the resulting reduction in traffic wo uld
allow for a four-lane section to be maintained alon g US 278 across the bridges and/or between Windmill
Harbour and Squire Pope Road (e.g., 30% reduction in 2023 traffic or 40% reduction in traffic by 2045),
given that the existing Palmetto Breeze transit system accounts for less than 1% of the region’s transi t
mode share today.
In regard to the implementation of a facility usage fee, it is our understanding that laws within the State
of South Carolina only allow tolls/fees to be imple mented on new roads within the State system. As suc h,
implementing facility usage fees on any of the existing roadways that are within the William Hilton
Parkway Gateway Corridor Study area would be prohib ited. It should be noted that, even if a facility usage
fee could be implemented, the fee would largely imp act commuters, not tourists, who enter and exit the
island for work, as the majority of traffic during the AM and PM peak hours is a result of commuter tr affic.
Therefore, even if a facility usage fee could be implemented, it is highly unlikely the resulting redu ction in
traffic would allow for a four-lane section to be maintained along US 278 across the bridges and/or
between Windmill Harbour and Squire Pope Road (e.g. , e.g., 30% reduction in 2023 traffic or 40%
reduction in traffic by 2045).
Page 149 of 300
May 3, 2024
Page 5
Conclusions
Lochmueller evaluated the viability of maintaining four lanes along William Hilton Parkway (US 278)
between Windmill Harbour and Squire Pope Road; the implementation of a second bridge; modifications
to the existing mass transit system; implementation of a new ferry system; and the implementation of a
facility usage fee. These evaluations were completed by Lochmueller to determine feasibility of
maintaining a four lane section along William Hilto n Parkway between Moss Creek Drive and Squire Pope
Road, if one or more of these strategies were imple mented.
As noted in this technical memorandum, the existing traffic volumes already create significant congest ion
along US 278, and the congestion is expected to be ex acerbated by 2045 with the forecasted background
growth. Based on a preliminary analysis, the existi ng traffic volumes would need to be reduced by
approximately 30%, and the 2045 traffic volumes would ne ed to be reduced by approximately 40%, in
order for a four-lane section to operate acceptably .
Based on Lochmueller’s evaluations, it was conclude d that it would be highly unlikely that modificatio ns
to the existing transit system alone could account for enough trips and the mode share percentage
needed to sufficiently reduce the number of trips a cross the US 278 bridges, such that a four-lane facil ity
could be maintained, given that the current transit mode share within the region is less than 1%, and
would therefore have to increase exponentially to r each the target goal. In addition, neither the
implementation of a new ferry system, nor the imple mentation of a facility usage fee (if there were a legal
way to implement said fee), would be able to signif icantly reduce the number of vehicles along US 278
within the study area to allow for a four-lane section to be maintained.
In order for the existing four-lane section to operate acceptably, the total reduction in vehicles fro m mass
transit, a new ferry system, and the implementation of a facility usage fee would need to be between 30 -
40%. While implementing the aforementioned types of t ransportation strategies would help slow future
traffic growth on US 278, it is Lochmueller’s opinion that even if all of these strategies are implement ed,
the reduction in vehicles would not reach 30%. Furth ermore, these strategies would not address the
structural issues associated with the existing brid ges over Mackay Creek and Skull Creek. Consequently , it
is Lochmueller’s opinion that these strategies shou ld not be considered as viable alternatives to be u sed
individually and/or collectively to solely address traffic congestion and mobility related concerns al ong US
278 within the project study area, that could allow a four-lane section to be maintained along US 278
within the study area.
In regard to implementing a second bridge and/or po int of access onto Hilton Head Island from the
mainland, while it is acknowledged there are clear benefits to providing a second bridge (e.g., redund ancy
during natural disasters), Lochmueller’s evaluation s show that operating conditions along US 278 are
already congested today. Given the congestion that is already experienced along this corridor today, t he
amount of traffic that would need to be removed fro m the existing traffic stream to be able to maintai n
four lanes across the bridge (i.e., 30% reduction in 2023 traffic or 40% reduction in traffic by 2045), and
the time it would take to construct a second bridge , it is our opinion that a six-lane section of US 278 onto
Hilton Head Island is needed independently of a sec ond bridge.
Page 150 of 300
P A G E | 9
Independent Study of WHP Gateway Corridor
Summary of Submitted Memorandums
SCDOT Seismic Study Review Findings Memorandum (Task 1.8)
7
Page 151 of 300
MEMO
Huntington Tower, 201 W Springfield Avenue, Suite 1012
Champaign, Illinois 61820
PHONE: 217.673.7633
To: Town of Hilton Head Island, South Carolina
From: Lochmueller Group
Date: May 31, 2024
Subject: Independent Study of the William Hilton Parkway Gat eway Corridor
SCDOT Seismic Study Review Findings – Task 1.8
During the May 8, 2024, William Hilton Parkway Gateway C orridor Independent Review Advisory
Committee meeting, Lochmueller provided findings re lated Lochmueller’s cursory, high-level review the
US 278 Bridge Seismic Study prepared by the South Caro lina Department of Transportation (SCDOT) in
April of 2020. Lochmueller was asked to perform this cursory, high-level review of SCDOT’s Seismic Study
to offer a professional opinion regarding the feasi bility of seismically retrofitting and structurally
rehabilitating the existing US 278 bridges to allow fo r six travel lanes (three eastbound lanes and three
westbound lanes), rather than constructing the new six-lane bridge proposed by SCDOT. A copy of the
Seismic Study Review related slides that were prese nted during the 5/8 Committee meeting are attached
to this memorandum as Appendix A .
The SCDOT Seismic Study included an evaluation of o ptions to retrofit, widen, or replace the existing US
278 bridges onto Hilton Head Island, and provided info rmation to SCDOT to implement best replacement
strategies, as well as detailed Life Cycle Cost Ana lysis (LCCA) results, considering three Options:
• Option #1 – Construct a new eastbound bridge over Mackay Cre ek & Skull Creek; widen the
existing westbound bridge over Mackay Creek; and mo dify the existing Skull Creek bridges for
westbound movements.
• Option #2 – Construct a new eastbound bridge over Mackay Cre ek & Skull Creek; replace the
existing westbound bridge over Mackay Creek; and mo dify the existing Skull Creek bridges for
westbound movements.
• Option #3 – Construct a new six-lane bridge between Bluffton and Hilton Head Island, and then
remove all existing bridges across Mackay Creek and Skull Creek.
A copy of the LLCA prepared by SCDOT’s Design team is shown below:
Page 152 of 300
May 31, 2024
Page 2
It should be noted that Lochmueller’s efforts in re viewing the Seismic Study prepared by SCDOT were
limited to a cursory review of the SCDOT Design Tea m’s structural analysis related assumptions and
findings; LLCA results; their noted benefits/risks with Options 1/2/3; and if these efforts by SCDOT’s
Design Team appeared to following standard engineer ing practices. Lochmueller’s efforts did not inclu de
any detailed evaluations of the SCDOT Design Team’s design calculations or software modeling
inputs/results; any considerations for alternative Options to consider for inclusion in the Seismic St udy;
any roadway, bridge, or environmental design/review services; or coordination with SCDOT, their Design
Team, Beaufort County, Town of Hilton Head, and/or any other governing Agency or design consultant
associated with the US 278 project.
Key observations from Lochmueller’s review of the SCDOT Seismic Study are summarized below. Please
refer to Appendix A for additional information:
• The SCDOT Design Team’s structural analysis finding s; LCCA results; and noted benefits/risks with
Options 1/2/3 appear valid and appear to follow standa rd engineering practices.
• The LCCA results do not account for costs that woul d be required to improve seismic conditions
for Options 1 & 2. Therefore, true costs associated with Options 1 & 2 would be significantly
higher to implement, than what is shown in the LCCA table above.
• Options 1 & 2 would take approximately 2 years longer to construct vs Option 3. The
rehabilitated structures would still need to be rep laced at some point, and time required to do so
is not accounted for in this table.
• Existing bridge structures would be approximately 50 years old after improvements made by
Options 1 or 2, with rehab efforts likely to extend life of existing structures by approximately 25
to 35 years. By comparison, typical design life for Option 3 newly constructed bridges
approximately 75 to 100 years.
• Options 1 & 2 being pursued for use solely as tempora ry condition would require more than
$130M to construct initially (using 2020 costs), and these costs do not account for needed
Functional Evaluation Earthquake (FEE) seismic desi gn improvements. Depending upon when
remaining structures were replaced, the future/user /maintenance costs req’d over that time
would assuredly lead to higher overall cost than bu ilding new at outset.
• Options 1 & 2 would put maintenance/replacement sched ules of the structures on varying
timeframes, which would cause additional user disru ptions in the future.
• Existing structures under Options 1 & 2 would never m eet Safety Evaluation Earthquake (SEE)
seismic design requirements. New structures can be built to meet SEE seismic design
requirements.
• In summary, Lochmueller does not recommend rehabili tation and/or retrofit options being
pursued for this project, in lieu of constructing a new six-lane bridge connecting Bluffton and
Hilton Head Island.
Page 153 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Objective: Perform cursory, high-level review of seismic study and offer
professional opinion regarding feasibility of seismic retrofit & structural rehab
existing bridges vs. constructing new bridge
o PDF copy of SCDOT approved US 278 Bridge Seismic Study (dated April 2020) provided to
Lochmueller on 4/15/24.
o Study included evaluation of options to retrofit, widen, or replace the existing US 278 bridges
onto HHI, and provided information to SCDOT to implement best replacement strategy, as well
as detailed Life Cycle Costs Analysis (LCCA) results, considering following three Options:
Option #1 – Construct new EB bridge over Mackay Creek & Skull Creek; widen existing
WB bridge over Mackay Creek; modify existing Skull Creek bridges for WB movements.
Option #2 – Construct new EB bridge over Mackay Creek & Skull Creek; replace existing
WB bridge over Mackay; modify existing Skull Creek bridges for WB movements.
Option #3 – Construct new 6-lane bridge; remove all existing bridges
APPENDIX A
PAGE 1 OF 15
Page 154 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• With each Option, a new EB bridge will be constructed
o Designed to SCDOT standards to withstand seismic events
o Serve as a “lifeline” bridge in case of significant seismic event for Options 1 or 2
• Assumed Construction Sequence
o Options #1 or #2 :
New EB structure constructed wide enough to accommodate 4-Lanes, 2-Way traffic in
temporary condition & 6-Lanes in permanent condition.
All traffic moved to new EB structure, while demolition / seismic retrofits / structural
repairs & replacements take place on existing structures.
Traffic then moved in to final positions
If necessary, traffic can be returned to the 4-Lanes, 2-Way traffic pattern on EB structure
o Option #3 :
Entire new 6-Lane structure can constructed with traffic retained in existing patterns
APPENDIX A
PAGE 2 OF 15
Page 155 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
APPENDIX A
PAGE 3 OF 15
Page 156 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
APPENDIX A
PAGE 4 OF 15
Page 157 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
APPENDIX A
PAGE 5 OF 15
Page 158 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
APPENDIX A
PAGE 6 OF 15
Page 159 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
APPENDIX A
PAGE 7 OF 15
Page 160 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team:
o All existing bridges designed and constructed prior to SCDOT’s implementation of seismic
analysis and detailing. Therefore, all existing bridges are considered inadequate when
compared to today’s seismic design standards .
o In order to model existing structures, SCDOT design team assumed minimum level of seismic
retrofits would be performed. Design team did not determine if existing structures could
withstand any seismic event without minimum retrofits being performed.
o SCDOT design team intended to evaluate the bridges for two seismic events as required by
SCDOT Seismic Design Specifications (SDS):
Functional Evaluation Earthquake (FEE) = lower magnitude earthquake event that has higher
chance of occurrence during life of the bridge.
Safety Evaluation Earthquake (SEE) = higher magnitude earthquake event that has lower
chance of occurrence during life of the bridge.
NOTE: US 278 Bridges assigned highest SCDOT SDS classification rating OC 1; therefore, must
meet FEE design thresholds at a minimum
APPENDIX A
PAGE 8 OF 15
Page 161 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team (cont.):
o It was determined that soils around and below the existing bridge foundations and roadway
approaches can liquefy at ground accelerations just above the FEE event:
This liquefaction could cause bridges/roadways to settle, slide or collapse during and/or
after seismic event.
Design team recognized that mitigation for liquefaction (i.e., add’l foundations, deep soil
mixing, etc.) would likely exceed costs for new construction, and would greatly increase
environmental disturbance.
Design team therefore elected to limit structural improvements through seismic retrofits
to FEE level, w/ SCDOT concurrence.
New bridges can be constructed to meet SEE requirements; existing bridges only will be
able to attain FEE requirements at best.
APPENDIX A
PAGE 9 OF 15
Page 162 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team (cont.):
o SCDOT Design team prepared LCCA, for Options 1/2/3, as shown below.
Costs are in 2020 dollars, assume annual inflation of 2% for future costs.
Construction costs developed from historical data, as well as correspondence w/ local
Contractors. Widening existing structures over water ~1.5 to 2 times more expensive than
new construction.
User Costs developed from SCDOT provided data, based on cost/lane/day.
Maintenance costs based on existing bridge details and assumed new bridges.
NOTE: LCCA costs only reflect rehabilitation related costs (e.g., widening, maintenance,
cosmetic improvements), and do not include retrofit related costs (e.g., seismic related
improvements). Therefore, true costs to attain FEE standards for Options 1 & 2 would be
significantly higher than those shown in the table below .
APPENDIX A
PAGE 10 OF 15
Page 163 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team (cont.):
o SCDOT Design team evaluated benefits & risks of Options 1/2/3
APPENDIX A
PAGE 12 OF 15
Page 164 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team (cont.):
o SCDOT Design team evaluated benefits & risks of Options 1/2/3 (cont.)
APPENDIX A
PAGE 13 OF 15
Page 165 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Observations by Lochmueller Group:
o SCDOT Design Team’s structural analysis findings; LCCA results; and noted benefits/risks
associated with Options 1/2/3 appear valid and appear to follow standard engineering practices.
o LCCA results do not account for costs that would be required to improve seismic conditions for
Options 1 & 2. Therefore, true costs associated with Options 1 & 2 would be significantly
higher to implement, than what is shown in the LCCA table above .
o Options 1 & 2 would take ~ 2 years longer to construct vs Option 3. The rehabilitated structures
would still need to be replaced at some point, and time required to do so is not accounted for
in this table.
APPENDIX A
PAGE 14 OF 15
Page 166 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Observations by Lochmueller Group (cont.):
o Existing bridge structures would be ~50 years old after improvements made by Options 1 or 2,
with rehab efforts likely to extend life of existing structures by ~25 to 35 years. By comparison,
typical design life for Option 3 newly constructed bridges ~ 75 to 100 years .
o Options 1 & 2 being pursued for use solely as temporary condition would require >$130M to
construct initially (using 2020 costs), and these costs do not account for needed FEE
improvements . Depending upon when remaining structures were replaced, the
future/user/maintenance costs req’d over that time would assuredly lead to higher overall cost
than building new at outset.
APPENDIX A
PAGE 15 OF 15
Page 167 of 300
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Observations by Lochmueller Group (cont.):
o Options 1 & 2 would put maintenance/replacement schedules of the structures on varying
timeframes, which would cause additional user disruptions in the future .
o Existing structures under Options 1 & 2 would never meet SEE seismic design requirements .
New structures can be built to meet SEE seismic design requirements.
o In summary, Lochmueller does not recommend rehabilitation and/or retrofit options be pursued.
Page 168 of 300
P A G E | 27
Independent Study of WHP Gateway Corridor
Summary of Submitted Memorandums
Traffic Forecasting Memorandum (Task 2.3)
25
Page 169 of 300
MEMORANDUM
Lochmueller Group (Lochmueller) was retained by the Town of Hilton Head Island to conduct an
independent study of the William Hilton Parkway (WH P) Gateway Corridor. This memorandum
summarizes the review of the existing Lowcountry Ar ea Transportation Study (LATS) Travel
Demand Model (TDM) and recommends future traffic gr owth at the William Hilton Parkway
Bridge connecting Hilton Head Island with the mainland. The future traffic growth estimation was
based on a thorough review of historic traffic volu mes, socio-economic trends for Jasper and
Beaufort Counties, and accommodation and restaurant tax revenues collected per year by the
Town of Hilton Head.
LATS TDM Evaluation
The Lowcountry TDM was updated in December 2021 wit h a new base year, 2019, and a new
horizon year, 2045. Lochmueller completed a thorough review of the TDM to determine its ability
to forecast traffic growth along WHP.
The detailed review of the LATS TDM revealed the following:
• The latest update was limited/minor in nature and d id not include any major model
changes.
• 2045 Horizon year roadway network did not include all future planned projects.
• Socio-economic (e.g., population, household, employ ment) growth for the horizon year
2045 was forecasted by simply extrapolating 2040 at tributes of the previous version of
the TDM.
• Socio-economic projections did not consider recent land-use plan updates from
municipalities within the TDM boundaries.
• The TDM update did not include a complete model re-estimation and re-calibration.
• The LATS Long-Range 2045 Transportation Plan forecasts 48,500 more future population
in Jasper and Beaufort Counties than incorporated into the TDM.
To: Shawn Colin, AICP (Town of Hilton Head)
Cc: Bryan McIlwee, PE (Town of Hilton Head)
Jim Iwanicki, PE (Town of Hilton Head)
From: Nate Nohren, PE, PTOE
Sharif Ullah, PE, PTP
Date: February 12, 2024
Subject: Independent Study of WHP Gateway Corridor
Traffic Forecasting Memorandum
Page 170 of 300
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 2 of 8
Based on these findings, Lochmueller staff determin ed the LATS TDM may not provide accurate
traffic forecasts for WHP. To that end, alternative methods of traffic forecasting were
investigated. First, key data indicators of traffic growth were researched.
Socio-Economic Trends for Hilton Head Island, Jasper County, and Beaufort
County
Hilton Head Island is located in Beaufort County. B eaufort and neighboring Jasper County
experienced significant growth over the last 20 yea rs. Table 1 shows population growth trends
for Beaufort and Jasper Counties and Hilton Head Is land based on the US Census. This data
reflects permanent residents.
Table 1: Population Trends 1
Geographic
Unit
Year Annual
Growth (%)
(2000 -2010)
Annual
Growth (%)
(2010 -2020) 2000 2010 2020
Beaufort
County
120,937 162,233 187,117 3.0 1.4
Jasper
County
20,678 24,777 28,791 1.8 1.5
Hilton
Head Island
33,862 37,099 37,661 0.9 0.2
As shown in Table 1 , both Beaufort and Jasper Counties experienced sig nificant population
growth since 2000. However, population growth was m uch slower between 2010 and 2020
compared to 2000 to 2010. Hilton Head Island experi enced a modest growth rate of 0.2% from
2010 and 2020.
Table 2 shows the total employment for Beaufort and Jasper Counties and Hilton Head Island for
2010 and 2020.
Page 171 of 300
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 3 of 8
Table 2: Total Employment Trend 1
Geographic
Unit
Year Annual
Growth (%)
(2010 -2020)
2010 2020
Beaufort
County 51,761 62,001 1.8
Jasper
County 6,522 9,819 4.2
Hilton Head
Island 21,346 21,854 0.2
As can be seen in Table 2 , both Jasper and Beaufort Counties experienced sig nificant growth in
jobs between 2010 and 2020. Overall job growth in H ilton Head Island was small and similar to
the island’s population growth rate.
Population Growth Projections for Beaufort and Jasper Counties
Population growth estimates are a key element in forecasting traffic growth for a region. For this
study, Lochmueller staff researched reliable population growth estimates for Beaufort and Jasper
counties. The State of South Carolina’s Revenue and Fiscal Affairs Office provides population
growth estimates for all counties within the state through 2035. Table 3 shows the population
projections for Beaufort and Jasper Counties for 2035 and the corresponding growth rates.
Table 3: Population Growth Projections 2
County
Year Annual
Growth
Rate (%) 2020 2035
Beaufort 187,691 204,374 0.56
Jasper 29,073 34,046 1
Total 216,764 238,420 0.6
Page 172 of 300
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 4 of 8
Historic Annual Average Daily Traffic Volume Trends at the WHP Bridge
Lochmueller staff obtained Annual Average Daily Tra ffic (AADT) volumes on WHP near the WHP
Bridge (Site ID #0035) from the South Carolina Department of Transportation’s Traffic Data Site 3.
Table 4 shows the AADT volumes by year. These volumes effe ctively represent the volume of
traffic entering and exiting Hilton Head Island via US 278.
As shown in Table 4 , there was a significant reduction in growth betwe en 2019 and 2020 and a
significant increase in growth between 2020 and 202 1. Such sudden changes were attributed to
COVID-19 pandemic-related restrictions. Overall tra ffic growth on WHP from 2010 to 2023 was
approximately 16.5%.
Table 4: AADT Volumes on WHP near the WHP Bridge
3
Year AADT Annual
Growth (%)
2010 49,600
2011 49,900 0.60%
2012 50,700 1.60%
2013 52,200 2.96%
2014 53,200 1.92%
2015 54,700 2.82%
2016 54,700 0.00%
2017 56,300 2.93%
2018 56,100 -0.36%
2019 57,100 1.78%
2020 51,400 -9.98%
2021 57,400 11.67%
2022 57,400 0.00%
2023 57,800 0.70%
Page 173 of 300
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 5 of 8
Short-Term Rental Permit and Tax Revenue Data
Lochmueller staff received information on the short -term rental units per year and the
accommodation (hotel) and restaurant tax revenues c ollected by the Town of Hilton Head. The
short-term rental unit information was available on ly for 2023. Thus, this information was not
used in statistical analysis. The accommodation and restaurant tax revenue information was
available from 2018 to 2023. Lochmueller staff eval uated the revenue data to test any relation
between revenues and the volume of traffic entering and exiting Hilton Head Island. These
measures are intended to represent the visitor popu lation as compared to permanent residents
reflected in the Census data. Table 5 shows the annual accommodation and restaurant tax
revenue information for the Town of Hilton Head Island.
Table 5: Annual Accommodation and Hospitality Tax (Source: Town of Hilton Head Island)
Year
Tax Revenue (2021 USD)
Accommodation
Tax
Hospitality
Tax
2018 $3,827,423 $7,419,881
2019 $3,964,475 $6,807,961
2020 $3,624,196 $6,598,684
2021 $5,561,900 $8,051,256
2022 $6,534,674 $9,213,533
2023 $6,260,297 $8,905,425
As shown in Table 5 , the tax revenues have increased significantly sin ce 2020 after a reduction
due to Covid-19 Pandemic-related impacts. These inc reases have outpaced traffic growth on
WHP entering/exiting the island and can be at least partially attributed to factors beyond the
number of visitors to the island, such as high rates of inflation in recent years.
Traffic Growth Estimation Using Available Data
Lochmueller staff performed regression analyses utilizing the preceding available socio-economic
and revenue information data as indicators of traffic on WHP at the WHP bridge. The regression
analyses considered AADT volumes as the dependent v ariable and evaluated whether different
independent variables (e.g., population, employment , tax revenue) had a statistically significant
influence on the AADT volumes.
In regression analysis, the coefficient of determination (R
2) and the P-values were used to identify
independent variables with significant impact on th e dependent variable. R 2 values explain to
what degree an independent variable (e.g., populati on) explains the variation of the dependent
variable (AADT). R2 values range from 0 to 1. An R 2 value of 0.7 indicates that 70% of the variation
in the output variable can be explained by the independent variable(s).
Page 174 of 300
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 6 of 8
The P-value is the probability that the observed di fference between the dependent and
independent variables is due to chance. Its value r anges from 0 to 1. A P-value close to 0 means
that any observed difference in the dependent varia ble is more likely due to the independent
variable (not by chance). For regression analysis w ith a 95% confidence interval, a P-value less
than 0.05 would represent a strong correlation betw een the dependent and independent
variables.
Table 6 shows the simple regression analysis (95% Confidence Interval) results in terms of R
2 and
P-values for various independent variables relative to the dependent variable (AADT).
Table 6: Simple Regression Analysis Results with Different Independent Variables
Independent Variable
Co-efficient of
Determination
(R 2)
P-Value
Total Population of Beaufort and
Jasper Counties 0.95 1.5E-08
Total Employment in Beaufort and
Jasper Counties 0.9 8.1E-07
Accommodation Tax 0.64 0.1
Hospitality Tax 0.37 0.28
As shown in Table 6, the total population and total employment in Beaufort and Jasper Counties
clearly influence the AADT volumes. P-values in both of these cases are very close to zero, which
confirms the differences in AADT are influenced by changes in population and employment
numbers in the two counties. On the other hand, there is no clear correlation between hospitality
tax and AADT and between accommodation tax and AADT.
Lochmueller staff also completed a more complex mul tiple regression analysis combining both
independent variables (population and employment). With the multiple regression analysis, the
adjusted R
2 value showed almost no improvement. Therefore, the simple regression analysis
using the total population of Beaufort and Jasper Counties was utilized to formulate an equation
for estimating AADT on WHP as a function of populat ion in the counties. Equation 1 shows the
regression equation for the AADT estimate.
Equation 1: Regression Equation for AADT Estimate
AADT = 0.262684*(Total Population of Beaufort and Jasper Counties) + 830
Page 175 of 300
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 7 of 8
Equation 1 was then used to forecast future traffic on WHP ba sed on anticipated population
growth. Lochmueller estimated the 2045 population of Beaufort and Jasper Counties utilizing the
following assumptions:
• Annual population growth in Hilton Head Island from 2020 to 2045 will be very small
(0.1%). As the population within Hilton Head Island is stable and available land for
development is very limited. Moreover, population growth in Hilton Head Island from
2010 to 2020 was only 0.2% per year.
• Annual population growth from 2020 and 2045 for the rest of Beaufort County and
Jasper County will be 0.6%, as suggested by the State of South Carolina’s Revenue and
Fiscal Affairs Office, referenced in Table 3 .
Based on the above-mentioned population growth assu mptions, Table 7 shows the projected
2045 population for the Beaufort and Jasper Counties.
Table 7: Projected Population
Geographic Unit
Projected
Annual
Growth
Rate
Population
2020 2045
Hilton Head Island 0.10% 37,661 38,614
Jasper County and
Beaufort County
(Excluding Hilton Head
Island)
0.60% 178,247 207,000
Total 215,908 245,614
As shown in Table 7 , the total population in 2045 for Beaufort and Jasper Counties was estimated
at 245,614. Applying Equation 1 , that population number would translate to 65,349 AADT on
WHP at the WHP Bridge.
Table 8 shows the estimated annual traffic growth rate fro m 2023 to 2045 based on the 2045
forecast of 65,425 compared to the 2023 traffic count.
Page 176 of 300
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 8 of 8
Table 8: Projected Traffic Growth Rate at the WHP Bridge
Year AADT
Annual
Growth
Rate (%)
2023 57,800 0.56
2045 65,349
Conclusion
Lochmueller determined that the LATS TDM may not be a reliable source of future traffic on WHP.
Through careful application of statistical analysis, an alternative method for forecasting traffic on
WHP was developed using the population of Beaufort and Jasper Counties as the key indicator.
Based on this method, traffic on WHP at the WHP Bridge is expected to increase by 0.56 percent
annually, resulting in an AADT forecast of 65,349 daily vehicles in 2045.
Lochmueller Group appreciates the opportunity to serve the Town of Hilton Head by performing
this independent analysis to determine the appropri ate annual background growth rate that
should be utilized for the overall corridor study. Should you have any questions regarding the
information shared within this technical memorandum , please do not hesitate to contact us at
nnohren@lochgroup.com or 217-821-8435.
Reference
1. U.S. Census Bureau (www.census.gov )
2. South Carolina Revenue and Fiscal Affairs Office. (www.rfa.sc.gov ).
3. South Carolina Department of Transportation Traffic Counts Website.
(www.scdot.org/travel/travel-trafficdata.aspx )
Page 177 of 300
P A G E | 36
Independent Study of WHP Gateway Corridor
Summary of Submitted Memorandums
Corridor Alternatives Analysis Memorandum (Task 3.6)
34
Page 178 of 300
MEMO
Huntington Tower, 201 W Springfield Avenue, Suite 1012
Champaign, Illinois 61820
PHONE: 217.673.7633
To: Town of Hilton Head, South Carolina
From: Lochmueller Group
Date: May 3, 2024
Subject: Independent Study of the William Hilton Parkway Gateway Corridor
Corridor Alternatives Analysis Memorandum – Task 3.6
Lochmueller Group (Lochmueller) has prepared the following memorandum pertaining to the
Independent Study of the William Hilton Pkwy Gateway Corridor. This memorandum summarizes the
findings related to the 2023 existing conditions and 2045 no build conditions for the entire project area
which includes US 278 from Moss Creek Drive to Indigo Run Drive, as well as US 278 (Palmetto Bay Road)
from Cross Island Pkwy to Sea Pines Circle. Figure 1 shows the entire project area which was used for the
2023 existing conditions and 2045 no build analysis. This memorandum also provides a summary of the
four alternatives considered for the 2045 build conditions for the modified original project area which
extends along US 278 from Moss Creek Dr to Gumtree Road. Figure 2 shows the modified original project
area which was used for the 2045 alternatives analysis. The intention of this memorandum is to provide
the Town of Hilton Head with the findings of the 2023 existing, 2045 no build, and 2045 alternatives
analysis.
Page 179 of 300
May 3, 2024
Page 2
FIGURE 1. ENTIRE PROJECT STUDY AREA
FIGURE 2. MODIFIED ORIGINAL PROJECT STUDY AREA
Moss Creek Dr
Indigo Run Dr
Gumtree Rd
Sea Pines Circle
Moss Creek Dr
Gumtree Rd
Page 180 of 300
May 3, 2024
Page 3
2023 Existing Conditions
The 2023 existing conditions analysis is intended to reflect current conditions. This scenario provides a
baseline to ensure accurate calibration of the models as well as serve as a comparison to the future 2045
no build and 2045 alternatives analyses.
2023 Existing Traffic Volumes
Traffic volumes were collected by others at the following intersections on March 22, 2023:
• Buckingham Plantation Dr and Bluffton
Pkwy
• Buckingham Plantation Dr and US 278
• Moss Creek Dr and US 278
• WB Bluffton Pkwy Ramp and WB US 278
• EB Bluffton Pkwy Ramp and EB US 278
• Fording Island Rd Extension and US 278
• Pinckney Wildlife Refuge and US 278
• Blue Heron Point Rd and US 278
• Crosstree Dr and US 278
• Jenkins Rd and US 278
• Squire Pope Rd and US 278
• Spanish Wells Rd and US 278
• Cross Island Pkwy Diverge and EB US 278
• Cross Island Pkwy Merge and WB US 278
• Gumtree Rd and Cross Island Pkwy Off and
On Ramps
• Gumtree Rd and Business US 278
• Jarvis Park Rd and Business US 278
• Pembroke Dr and Business US 278
• Indigo Run Dr and Business US 278
• Marshland Rd and Spanish Wells Rd
• Marshland Rd and SB Cross Island Pkwy
Ramps
• Marshland Rd and NB Cross Island Pkwy
Ramps
• Arrow Rd and US 278
• Target Rd and US 278
• Sea Pines Circle and US 278
This study evaluates conditions during the morning and evening peak periods of a typical weekday, as
these periods represent the most critical times of day for traffic operations within the study area for
commuter peaks. If traffic can be accommodated during these peak periods, it stands to reason that
adequate capacity would be available throughout the remainder of the day.
Corridor studies often reference the 30th highest day for traffic volumes to ensure that the volumes used
in the analysis reflect peak conditions, while not over- or under-estimating the traffic volumes. Therefore,
it was necessary to ensure that the counts collected accurately reflect the 30 th highest day. Historical
traffic data was obtained from SCDOT from the most recent 365 days. Given that the study focuses on
commuter peak hours, the hourly data from 6:00 AM – 6:00 PM was referenced. After reviewing the
traffic volumes throughout the year, it was determined that March 30, 2023 was the 30th highest day out
of the year for traffic volumes. The counts collected on March 22, 2023 were grown by the percent
difference between the two dates to bring them up to the estimated traffic volumes on March 30, 2023
(30th highest day). The resulting 2023 traffic volumes used in this study are provided in Appendix A.
2023 Existing Traffic Analysis
The 2023 existing traffic analysis was completed using the volumes provided in Appendix A at the study
intersections shown in Figure 1. The 2023 existing traffic analysis includes the adaptive signal
improvements approved by The Town of Hilton Head and implemented by Q-Free in the fall of 2023.
Page 181 of 300
May 3, 2024
Page 4
Synchro Analysis
This preliminary analysis was completed using Synchro 11 traffic modeling software, which is based upon
the methodologies outlined in the “Highway Capacity Manual” (HCM) published by the Transportation
Research Board. Intersection performance or traffic operations are quantified by six Levels of Service
(LOS), which range from LOS A ("Free Flow”) to LOS F ("Fully Saturated"). LOS D is considered acceptable
for peak period conditions in urban and suburban areas. However, at side-street stop-controlled
intersections, a LOS E or even a LOS F is a common occurrence for peak period conditions in urban and
suburban areas as it is typical for delays to be longer for vehicles along the side -street as they wait to find
acceptable gaps in the traffic to turn left into the traffic stream.
Levels of service for intersections are determined based on the average d elay experienced by motorists.
Signalized intersections reflect higher delay tolerances as compared to unsignalized and roundabout
locations because motorists are accustomed to and accepting of longer delays at signals. For signalized
and all-way stop intersections, the average control delay per vehicle is estimated for each movement and
then aggregated for each approach and the intersection as a whole. For intersections with partial ( side-
street) stop control, the delay is calculated for the minor movements only (side -street approaches and
major road left-turns) since thru traffic on the major road is not required to stop.
Table 1 summarizes the criterion for both signalized and unsignalized inte rsections, as defined by the
Highway Capacity Manual (HCM) 6th Edition, last updated in 2016 by the Transportation Research Board.
TABLE 1: INTERSECTION LEVEL OF SERVICE THRESHOLDS
Level of Service
Control Delay per Vehicle (sec/veh)
Signalized Unsignalized/Roundabout
A < 10 0-10
B > 10-20 > 10-15
C > 20-35 > 15-25
D > 35-55 > 25-35
E > 55-80 > 35-50
F > 80 > 50
Operating conditions at the study intersections were evaluated using Synchro 11 and are summarized in
Table 2. The measures of effectiveness reported include LOS, delay, queue, and volume -to-capacity ratio
(v/c). The delay is reported in seconds per vehicle. The queue is reported in feet as the 95th percentile
queue. The v/c ratio compares vehicle demand to the capacity of an associated lane group. A v/c ratio of
1.0 represents a road segment that is at full capacity.
As shown, eastbound traffic experiences significant congestion during the AM peak period , whereas
westbound traffic experiences significant congestion during the PM peak period. This is consistent with
the commuter traffic patterns in the Town of Hilton Head.
While several intersections experience long delays and queue lengths during the AM peak hour, the PM
peak hour appears to have overall worse operating conditions . Long delays occur along side-streets at
Page 182 of 300
May 3, 2024
Page 5
unsignalized intersections throughout the entire study area. Additionally, a rolling queue begins at
Wilborn Rd and continues in the westbound lanes of US 278 over the bridge during the PM peak hour. The
westbound queue length reaches up to approximately 2,500 ft (101 cars) at Squire Pope during the PM
peak hour. It is evident that the study area currently experiences congestion during both the AM and PM
peak periods.
TABLE 2. 2023 EXISTING OPERATING CONDITIONS (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (10.4) B (15.3)
Eastbound Approach A (7.1) [196] <0.37> A (9.1) [166] <0.29>
Westbound Approach B (12.4) [146] <0.21> B (17.5) [346] <0.46>
Northbound Approach D (41.9) [63] <0.14> C (34.2) [48] <0.15>
Southbound Approach B (18.4) [55] <0.25> C (24.3) [m81] <0.30>
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection B (19.2) C (29.6)
Eastbound Approach B (15.0) [413] <0.56> B (19.5) [391] <0.64>
Westbound Approach B (14.6) [291] <0.36> C (26.8) [710] <0.71>
Northbound Approach D (45.5) [126] <0.67> E (75.9) [103] <0.56>
Southbound Approach E (59.4) [107] <0.57> F (81.3) [#174] <0.91>
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (signal)
Eastbound Left Turn C (16.5) [<25] <0.03> E (43.4) [<25] <0.22>
Westbound Left Turn D (33.5) [<25] <0.05> D (26.6) [<25] <0.15>
Northbound Approach D (26.5) [<25] <0.23> C (21.7) [<25] <0.23>
Southbound Approach D (30.8) [45] <0.41> F (165.4) [150] <0.99>
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn C (18.0) [<25] <0.02> B (14.8) [<25] <0.04>
Northbound Approach F (242.4) [75] <0.81> F ($744.7) [168] <1.97>
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (15.4) [<25] <0.01> E (45.1) [<25] <0.05>
Westbound Left Turn No volumes observed C (22.7) [<25] <0.01>
Northbound Approach E (38.1) [<25] <0.02> F ($2538.4) [68] <2.99>
Southbound Approach No volumes observed F (50.4) [<25] <0.17>
Page 183 of 300
May 3, 2024
Page 6
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed C (23.8) [<25] <0.01>
Northbound Approach F ($794.0) [58] <1.19> F ($2033.9) [118] <3.51>
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection B (15.5) E (59.1)
Eastbound Approach C (21.2) [#1701] <0.97> B (10.3) [697] <0.82>
Westbound Approach A (5.2) [291] <0.62> F (93.2) [#2084] <1.16>
Northbound Approach D (38.0) [65] <0.42> E (68.0) [105] <0.72>
Southbound Approach 0 (0.0) [<25] <0.01> 0 (0.0) [<25] <0.00>
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (15.6) [<25] <0.02> F (56.9) [<25] <0.13>
Southbound Approach F ($469.6) [45] <0.73> F ($7285.9) [158] <12.12>
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (15.4) [<25] <0.01> E (45.1) [<25] <0.05>
Westbound Left Turn No volumes observed C (22.7) [<25] <0.01>
Northbound Approach E (38.1) [<25] <0.02> F ($2538.4) [68] <2.99>
Southbound Approach No volumes observed F (50.4) [<25] <0.17>
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed C (23.8) [<25] <0.01>
Northbound Approach F ($794.0) [58] <1.19> F ($2033.9) [118] <3.51>
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection B (15.5) E (59.1)
Eastbound Approach C (21.2) [#1701] <0.97> B (10.3) [697] <0.82>
Westbound Approach A (5.2) [291] <0.62> F (93.2) [#2084] <1.16>
Northbound Approach D (38.0) [65] <0.42> E (68.0) [105] <0.72>
Southbound Approach 0 (0.0) [<25] <0.01> 0 (0.0) [<25] <0.00>
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (15.6) [<25] <0.02> F (56.9) [<25] <0.13>
Southbound Approach F ($469.6) [45] <0.73> F ($7285.9) [158] <12.12>
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection B (12.5) F (101.4)
Eastbound Approach A (6.3) [530] <0.66> B (14.4) [#387] <0.93>
Westbound Approach A (9.4) [264] <0.55> F (140.5) [~2514] <1.26>
Northbound Approach C (24.0) [<25] <0.03> E (79.9) [70] <0.22>
Page 184 of 300
May 3, 2024
Page 7
Southbound Approach F (97.3) [#319] <1.01> F (296.1) [#709] <1.61>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach C (21.5) [28] <0.28> F (53.5) [<25] <0.13>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (30.1) D (36.0)
Eastbound Approach C (26.2) [1224] <0.85> B (16.7) [383] <0.62>
Westbound Approach B (18.2) [274] <0.66> C (25.2) [862] <0.80>
Northbound Approach E (61.8) [223] <0.62> F (214.3) [#667] <1.46>
Southbound Approach F (117.7) [#284] <1.00> E (65.7) [187] <0.36>
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection E (59.1) E (66.1)
Eastbound Approach E (64.3) [#1177] <0.98> E (65.7) [763] <0.90>
Westbound Approach C (33.6) [#412] <0.93> D (54.5) [648] <1.00>
Northbound Approach E (72.0) [#312] <0.89> E (61.5) [351] <0.86>
Southbound Approach F (90.7) [#418] <0.90> F (115.5) [#517] <1.07>
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (22.1) C (30.8)
Eastbound Approach B (16.6) [m516] <0.74> C (20.5) [m596] <0.73>
Westbound Approach B (11.3) [316] <0.50> C (25.6) [#1420] <0.98>
Northbound Approach F (99.7) [143] <0.61> F (108.7) [146] <0.76>
Southbound Approach E (65.5) [262] <0.77> E (67.9) [223] <0.96>
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection B (19.7) C (29.6)
Eastbound Approach B (11.2) [560] <0.73> B (18.0) [546] <0.60>
Westbound Approach A (9.0) [155] <0.44> C (22.9) [508] <0.82>
Northbound Approach F (101.1) [#317] <0.86> F (89.3) [324] <0.84>
Southbound Approach D (39.8) [78] <0.39> D (49.2) [95] <0.60>
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn B (10.7) [<25] <0.01> B (14.9) [<25] <0.01>
Westbound Left Turn C (16.0) [<25] <0.02> B (12.3) [<25] <0.01>
Northbound Right Turn C (18.3) [<25] <0.02> B (14.5) [<25] <0.03>
Southbound Right Turn B (12.8) [<25] <0.05> C (17.1) [<25] <0.02>
Page 185 of 300
May 3, 2024
Page 8
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn C (17.6) [<25] <0.04> C (16.1) [<25] <0.17>
Southbound Right Turn B (12.7) [<25] <0.02> C (17.5) [<25] <0.04>
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection C (31.1) D (42.1)
Eastbound Approach C (27.3) [693] <0.65> C (30.8) [634] <0.71>
Westbound Approach B (16.2) [343] <0.41> C (31.3) [891] <0.75>
Northbound Approach E (70.1) [112] <0.48> E (68.9) [205] <0.68>
Southbound Approach E (70.3) [#188] <0.78> F (96.0) [#247] <0.98>
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un -signalized)
Eastbound Approach B (11.0) [<25] <0.00> B (12.8) [<25] <0.15>
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (8.9) [<25] <0.12> A (8.4) [<25] <0.14>
Southbound Left Turn C (17.2) [<25] <0.08> D (33.6) [35] <0.35>
Southbound Right Turn A (9.2) [<25] <0.04> B (12.9) [<25] <0.16>
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (8.2) [<25] <0.11> A (8.4) [<25] <0.05>
Northbound Left Turn B (14.5) [<25] <0.17> C (23.0) [100] <0.61>
Northbound Right Turn A (9.2) [<25] <0.07> B (10.2) [<25] <0.20>
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn - F (209.4) [30] <0.40>
Eastbound Right Turn C (18.7) [<25] <0.02> B (14.9) [<25] <0.03>
Northbound Left Turn C (16.4) [<25] <0.02> B (13.0) [<25] <0.05>
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (13.8) C (21.1)
Eastbound Approach D (43.3) [175] <0.70> C (30.2) [101] <0.38>
Westbound Approach C (28.0) [74] <0.44> D (46.9) [249] <0.88>
Northbound Approach A (5.4) [75] <0.30> B (17.8) [756] <0.66>
Southbound Approach B (11.5) [535] <0.61> B (15.4) [432] <0.65>
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach D (33.1) [<25] <0.08> F (84.2) [<25] <0.19>
Southbound Left Turn A (9.6) [<25] <0.02> B (14.6) [<25] <0.01>
Page 186 of 300
May 3, 2024
Page 9
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach D (33.8) [<25] <0.08> F (61.2) [<25] <0.20>
Southbound Left Turn A (9.6) [<25] <0.03> B (14.6) [<25] <0.01>
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn C (23.7) [<25] <0.03> E (41.3) [<25] <0.10>
Westbound Right Turn B (11.1) [<25] <0.01> C (16.7) [<25] <0.03>
Southbound Left Turn A (9.8) [<25] <0.05> B (14.6) [<25] <0.03>
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn C (24.7) [<25] <0.06> E (41.3) [<25] <0.10>
Westbound Right Turn B (11.2) [<25] <0.01> C (16.7) [<25] <0.03>
Southbound Left Turn A (9.9) [<25] <0.07> B (14.6) [<25] <0.03>
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection B (10.6) B (18.6)
Eastbound Approach D (39.4) [82] <0.32> E (59.5) [247] <0.80>
Westbound Approach E (56.6) [154] <0.68> C (33.7) [119] <0.49>
Northbound Approach A (8.7) [199] <0.31> B (15.3) [530] <0.59>
Southbound Approach A (3.9) [102] <0.58> A (8.7) [155] <0.53>
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn D (26.5) [<25] <0.03> E (40.3) [<25] <0.24>
Westbound Right Turn B (11.4) [<25] <0.02> C (17.1) [<25] <0.18>
Southbound Left Turn B (10.6) [<25] <0.16> B (13.0) [<25] <0.02>
29: Palmetto Bay Rd & William Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection D (25.8) C (24.4)
Eastbound Approach D (34.2) [200] <0.81> E (45.6) [300] <0.92>
Westbound Approach C (16.4) [125] <0.64> E (36.6) [75] <0.85>
Northbound Approach B (12.1) [75] <0.54> D (32.4) [275] <0.88>
Southbound Approach F (59.4) [500] <1.03> E (39.2) [375] <0.94>
# – 95th Percentile volume exceeds capacity
$ – Delay more than 300 seconds
m – Upstream metering is in effect
VISSIM Analysis
In addition to Synchro, the traffic analysis was also completed using VISSIM, which is a microsimulation
tool that accurately replicates individual vehicles and their interactions within complex traffic streams,
such as interchanges, freeways, and expressway corridors with signalized intersections. A robust amount
of data and field observations were conducted to calibrate VISSIM to reproduce field conditions .
Page 187 of 300
May 3, 2024
Page 10
Field observations were conducted over the course of two weekdays in December 2023 and included both
the AM and PM peak periods. Travel time runs and average speeds were conducted during the AM and
PM peak periods along William Hilton Pkwy between Moss Creek and Indigo Run, as well as from William
Hilton Pkwy at Moss Creek Dr to Cross Island Pkwy at Sea Pines Circle, to aid in the calibration of the
VISSIM model.
As part of the calibration criteria, it was determined that the travel times reported in the VISSIM model
should be within 10% of the travel times recorded in the field. The travel times calculated in the VISSIM
model were inflated by 15% to account for higher volumes in March versus in December when the travel
times were collected. The travel time results are provided in Table 3. As shown all of the travel times were
within 10%, therefore all travel time targets were satisfied.
TABLE 3. 2023 EXISTING VISSIM CALIBRATION TRAVEL TIME RESULTS
Corridor
Observed travel
time (secs)
Simulated travel
time (secs) % Difference
AM PM AM PM AM PM
William Hilton Pkwy between Moss
Creek and Indigo Run
EB 1108 672 1157 619 4.42% -7.91%
WB 605 1202 572 1252 -5.50% 4.17%
William Hilton Pkwy @Moss Creek
to Cross Island Pkwy @Sea Pine
SB 1378 821 1356 857 -1.58% 4.37%
NB 800 1516 826 1520 3.20% 0.25%
In addition to travel time calculations, traffic volumes were also used to help calibrate the VISSIM model.
Similar to the travel times, it was determined that the traffic volumes reported in the VISSIM model
should be within 10% of the 2023 existing traffic volumes provided in Appendix A. The traffic volume
results are provided in Table 4. As shown all of the traffic volumes were within 10%, therefore all traffic
volume targets were satisfied.
TABLE 4. 2023 EXISTING VISSIM CALIBRATION TRAFFIC VOLUMES RESULTS
Location
Observed
traffic volumes
(vehicles)
Simulated
traffic volumes
(vehicles)
% Difference
AM PM AM PM AM PM
William Hilton Pkwy west of Squire Pope EB 2774 2237 2970 2240 7.07% 0.13%
William Hilton Pkwy west of Squire Pope WB 1639 3030 1650 2898 0.67% -4.36%
William Hilton Pkwy east of Spanish Wells EB 2729 1991 2929 1955 7.33% -1.81%
William Hilton Pkwy east of Spanish Wells WB 1408 2623 1423 2614 1.07% -0.34%
Cross Island Pkwy north of Marshland Rd NB 975 1422 964 1371 -1.13% -3.59%
Cross Island Pkwy north of Marshland Rd SB 1416 1190 1486 1167 4.94% -1.93%
Page 188 of 300
May 3, 2024
Page 11
The VISSIM traffic models evaluate conditions during the morning and afternoon peak hours and provide
performance measures as outputs. The LOS criteria for signalized and unsignalized intersections are the
same as Table 1. The measures of effectiveness (MOE) reported include levels of service, delay, average
queue length, and maximum queue length. The delay is reported in seconds per vehicle and the queue is
reported in feet.
The 2023 existing operating conditions based on the VISSIM model are summarized in Table 5. As shown,
the traffic operations largely agree with those shown in Table 2 from the Synchro analysis. The PM peak
hour appears to have overall worse operating conditions. The long delays presented in the Synchro
analysis along side-streets at unsignalized intersections throughout the entire study area were confirmed
in this VISSIM analysis. Therefore, it can be concluded that the study area currently experiences significant
congestion during both the AM and PM peak periods.
TABLE 5. 2023 EXISTING TRAFFIC OPERATIONS (VISSIM)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (12.2) B (11.4)
Eastbound Approach B (12.5) [43] {324} B (11.7) [<25] {178}
Westbound Approach A (8.3) [<25] {171} A (9.3) [<25] {234}
Northbound Approach D (38.1) [<25] {73} C (32.2) [<25] {65}
Southbound Approach A (9.0) [<25] {68} B (12.6) [<25] {84}
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection D (47.2) B (19.5)
Eastbound Approach E (70.7) [807] {1620} B (15.6) [65] {522}
Westbound Approach B (14.4) [35] {353} B (19.1) [100] {633}
Northbound Approach D (35.9) [37] {263} D (53.6) [<25] {104}
Southbound Approach D (42.4) [<25] {92} C (33.6) [29] {161}
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (un-signalized)
Eastbound Left Turn E (35.3) [720] {1302} C (19.7) [<25] {47}
Westbound Left Turn F (414.9) [37] {107} B (11.2) [<25] {41}
Northbound Approach B (10.1) [<25] {61} A (7.3) [<25] {55}
Southbound Approach C (19.7) [<25] {76} A (8.0) [<25] {73}
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn E (40.7) [46] {102} C (16.8) [<25] {28}
Northbound Approach F (591.0) [120] {186} C (17.5) [<25] {41}
Page 189 of 300
May 3, 2024
Page 12
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (21.4) [691] {1658} D (33.1) [<25] {<25}
Westbound Left Turn No volumes observed C (20.9) [<25] {<25}
Northbound Approach F (270.5) [<25] {38} C (20.8) [<25] {46}
Southbound Approach No volumes observed C (18.2) [<25] {39}
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed D (27.7) [<25] {<25}
Northbound Approach F (1,270.4) [123] {228} C (23.8) [<25] {60}
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection B (10.4) A (8.2)
Eastbound Approach A (8.4) [335] {1093} A (5.4) [62] {890}
Westbound Approach B (10.7) [53] {655} A (7.5) [292] {1626}
Northbound Approach E (67.8) [30] {164} E (79.0) [52] {214}
Southbound Approach B (17.3) [<25] {<25} A (0.0) [<25] {<25}
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn A (8.2) [<25] {<25} F (98.0) [<25] {54}
Southbound Approach F (51.8) [<25] {44} F (109.4) [<25] {92}
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection D (39.2) E (67.3)
Eastbound Approach E (56.8) [451] {1334} B (19.3) [283] {1132}
Westbound Approach A (7.0) [39] {618} F (104.8) [874] {1383}
Northbound Approach C (31.9) [<25] {38} E (78.6) [<25] {76}
Southbound Approach C (21.7) [<25] {147} F (91.6) [220] {638}
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach A (1.3) [<25] {<25} A (6.4) [<25] {25}
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (29.8) F (240.4)
Eastbound Approach C (26.6) [270] {1027} B (17.1) [103] {622}
Westbound Approach C (21.9) [87] {471} F (415.7) [892] {989}
Northbound Approach E (57.1) [85] {321} F (395.1) [1241] {1288}
Southbound Approach F (89.0) [103] {319} E (63.9) [58] {242}
Page 190 of 300
May 3, 2024
Page 13
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (40.7) E (66.4)
Eastbound Approach D (40.6) [765] {1592} D (49.9) [203] {779}
Westbound Approach C (30.3) [136] {357} E (75.2) [961] {1610}
Northbound Approach C (29.0) [75] {291} D (45.2) [175] {338}
Southbound Approach E (77.2) [182] {579} F (93.4) [234] {779}
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection D (39.2) E (67.3)
Eastbound Approach E (56.8) [451] {1334} B (19.3) [283] {1132}
Westbound Approach A (7.0) [39] {618} F (104.8) [874] {1383}
Northbound Approach C (31.9) [<25] {38} E (78.6) [<25] {76}
Southbound Approach C (21.7) [<25] {147} F (91.6) [220] {638}
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach A (1.3) [<25] {<25} A (6.4) [<25] {25}
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (29.8) F (240.4)
Eastbound Approach C (26.6) [270] {1027} B (17.1) [103] {622}
Westbound Approach C (21.9) [87] {471} F (415.7) [892] {989}
Northbound Approach E (57.1) [85] {321} F (395.1) [1241] {1288}
Southbound Approach F (89.0) [103] {319} E (63.9) [58] {242}
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (40.7) E (66.4)
Eastbound Approach D (40.6) [765] {1592} D (49.9) [203] {779}
Westbound Approach C (30.3) [136] {357} E (75.2) [961] {1610}
Northbound Approach C (29.0) [75] {291} D (45.2) [175] {338}
Southbound Approach E (77.2) [182] {579} F (93.4) [234] {779}
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (21.8) C (25.8)
Eastbound Approach B (17.1) [178] {929} B (13.8) [67] {754}
Westbound Approach B (17.9) [73] {543} C (34.2) [668] {1285}
Northbound Approach F (81.1) [45] {168} E (77.4) [43] {186}
Southbound Approach D (45.4) [72] {233} C (21.7) [28] {120}
Page 191 of 300
May 3, 2024
Page 14
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection B (18.7) C (33.7)
Eastbound Approach B (12.6) [134] {991} B (14.3) [76] {754}
Westbound Approach B (12.7) [39] {443} D (42.4) [645] {1261}
Northbound Approach E (72.0) [84] {274} E (69.4) [93] {310}
Southbound Approach D (37.3) [<25] {91} D (42.2) [<25] {115}
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn A (8.5) [<25] {<25} F (55.9) [<25] {50}
Westbound Left Turn C (16.5) [<25] {<25} A (9.7) [<25] {<25}
Northbound Right Turn C (21.6) [<25] {27} B (12.4) [<25] {32}
Southbound Right Turn B (11.3) [<25] {41} F (165.1) [<25] {65}
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn B (11.5) [<25] {25} A (7.7) [<25] {61}
Southbound Right Turn B (10.6) [<25] {46} F (93.1) [<25] {72}
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection C (23.3) D (44.1)
Eastbound Approach B (18.9) [115] {848} C (30.6) [116] {772}
Westbound Approach B (15.3) [40] {333} D (44.8) [592] {1536}
Northbound Approach D (54.0) [29] {103} E (58.6) [46] {190}
Southbound Approach D (49.7) [52] {187} E (73.4) [83] {324}
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un -signalized)
Eastbound Approach A (9.1) [<25] {45} B (10.9) [<25] {61}
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (3.7) [<25] {63} A (2.1) [<25] {60}
Southbound Left Turn A (8.8) [<25] {47} B (10.6) [<25] {77}
Southbound Right Turn A (6.1) [<25] {80} A (7.9) [<25] {110}
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (1.3) [<25] {36} A (1.4) [<25] {<25}
Northbound Left Turn B (10.8) [<25] {69} C (21.3) [31] {193}
Northbound Right Turn A (6.0) [<25] {94} A (7.0) [46] {218}
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed E (40.7) [<25] {33}
Eastbound Right Turn B (14.3) [<25] {25} B (12.5) [<25] {31}
Northbound Left Turn A (9.0) [<25] {<25} A (7.1) [<25] {34}
Page 192 of 300
May 3, 2024
Page 15
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (13.2) B (16.9)
Eastbound Approach C (33.3) [52] {191} C (32.0) [37] {175}
Westbound Approach B (18.8) [<25] {106} C (23.2) [56] {261}
Northbound Approach B (10.5) [29] {261} B (15.7) [92] {612}
Southbound Approach B (10.9) [94] {873} B (14.2) [67] {606}
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach C (17.1) [<25] {50} C (18.1) [<25] {52}
Southbound Left Turn A (3.2) [<25] {<25} B (13.2) [<25] {<25}
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach C (18.0) [<25] {53} C (17.4) [<25] {53}
Southbound Left Turn A (4.0) [<25] {37} A (7.5) [<25] {<25}
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn D (27.5) [<25] {<25} D (30.0) [<25] {35}
Westbound Right Turn A (8.4) [<25] {58} B (13.1) [<25] {68}
Southbound Left Turn A (3.6) [<25] {40} B (11.0) [<25] {26}
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn D (30.6) [<25] {27} D (32.8) [<25] {39}
Westbound Right Turn A (8.8) [<25] {63} B (11.4) [<25] {75}
Southbound Left Turn A (4.3) [<25] {98} B (11.9) [<25] {<25}
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection B (16.0) B (17.6)
Eastbound Approach C (33.3) [<25] {110} D (41.8) [62] {248}
Westbound Approach D (37.1) [35] {151} C (29.4) [38] {149}
Northbound Approach A (9.7) [28] {214} B (13.3) [71] {508}
Southbound Approach B (15.4) [287] {1309} B (13.9) [99] {742}
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn F (184.7) [<25] {50} F (65.5) [<25] {75}
Westbound Right Turn A (9.1) [<25] {84} B (13.1) [<25] {110}
Southbound Left Turn B (10.4) [112] {512} B (12.5) [<25] {383}
Page 193 of 300
May 3, 2024
Page 16
29: Palmetto Bay Rd & William Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection E (37.0) F (51.8)
Eastbound Approach F (208.4) [615] {814} F (51.0) [285] {770}
Westbound Approach A (7.5) [<25] {263} F (168.3) [1635] {1658}
Northbound Approach A (4.2) [<25] {223} D (30.8) [228] {738}
Southbound Approach B (12.9) [194] {461} A (8.4) [85] {460}
2045 No Build Conditions
The 2045 no build conditions analysis is intended to reflect future conditions within the study area while
accounting for an increase in “background” traffic. No modifications were made to the lane
configurations. However, the 2045 no build scenario does include the effects of the adaptive signal
system implemented in the fall of 2023.
2045 No Build Traffic Volumes
In order to evaluate traffic conditions through the year 2045, it was necessary to forecast the anticipated
growth within the study area based on an increase in “background” traffic resulting from increasing
population and commercial and employment growth in The Town of Hilton Head.
An annual background growth rate of 0.56% was determined after careful consideration of the
Lowcountry Area Transportation Study (LATS) Travel Demand Model (TDM), census data, Beaufort County
historic growth trends, historic traffic growth on the US 278 bridge, sale and restaurant tax revenue,
public parking revenue, and short term rental data. A memorandum detailing the methodology behind
the 0.56% growth rate is provided an Appendix B. The 2023 existing traffic volumes (Appendix A) were
grown annually by 0.56% to 2045 in order to produce the 2045 no build traffic volumes which are
provided in Appendix C.
2045 No Build Traffic Analysis
Similar to the 2023 existing conditions, the 2045 no build traffic analysis was completed using both
Synchro and VISSIM. The 2045 no build operating conditions were evaluated using the same methodology
applied to the 2023 existing conditions.
Synchro Analysis
The 2045 no build operating conditions at the study intersections were evaluated using Synchro 11 and
are summarized in Table 6. As shown, the previously failing conditions and congestion experienced in the
2023 existing conditions are expected to be exacerbated by 2045 with the forecasted growth. Significant
congestion is expected throughout the study area. Therefore, it can be concluded tha t the study
intersections cannot accommodate the forecasted traffic growth in their existing state.
Page 194 of 300
May 3, 2024
Page 17
TABLE 6. 2045 NO BUILD OPERATING CONDITIONS (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (17.6) C (25.5)
Eastbound Approach B (15.1) [298] <0.54> B (16.0) [207] <0.50>
Westbound Approach C (25.4) [202] <0.38> D (36.7) [#496] <0.86>
Northbound Approach B (15.9) [37] <0.08> B (15.7) [30] <0.11>
Southbound Approach A (9.9) [m23] <0.18> A (6.1) [m21] <0.23>
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection B (18.2) C (26.9)
Eastbound Approach B (16.9) [443] <0.64> B (17.1) [345] <0.75>
Westbound Approach B (17.9) [290] <0.51> C (28.1) [#644] <0.89>
Northbound Approach C (21.2) [98] <0.56> D (49.7) [m#76] <0.74>
Southbound Approach C (31.2) [70] <0.45> E (60.9) [#123] <0.88>
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (18.8) [<25] <0.03> F (65.8) [33] <0.33>
Westbound Left Turn E (44.8) [<25] <0.08> D (34.9) [<25] <0.22>
Northbound Approach D (34.4) [33] <0.31> D (26.7) [30] <0.30>
Southbound Approach F (57.0) [88] <0.63> F (649.6) [273] <2.05>
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn C (21.6) [<25] <0.02> C (17.0) [<25] <0.06>
Northbound Approach F (684.9) [115] <1.63> F ($1880.2) [225] <4.10>
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (17.8) [<25] <0.01> F (67.3) [<25] <0.08>
Westbound Left Turn No volumes observed C (28.7) [<25] <0.01>
Northbound Approach F (50.7) [<25] <0.03> D (32.3) [<25] <0.09>
Southbound Approach No volumes observed F (74.9) [<25] <0.26>
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed D (30.2) [<25] <0.01>
Northbound Approach F ($1763.6) [73] <2.35> F ($5024.3) [145] <8.33>
Page 195 of 300
May 3, 2024
Page 18
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection E (67.8) F (92.1)
Eastbound Approach F (105.5) [#2262] <1.19> C (33.3) [#1547] <1.00>
Westbound Approach A (5.9) [320] <0.64> F (133.8) [~2456] <1.26>
Northbound Approach B (14.6) [34] <0.39> E (77.5) [#106] <0.86>
Southbound Approach 0 (0.0) [<25] <0.01> 0 (0.0) [<25] <0.00>
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (18.3) [<25] <0.03> F (91.5) [<25] <0.22>
Southbound Approach F ($1398.4) [65] <1.86> F (151.3) [73] <.69>
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection C (23.4) F (144.6)
Eastbound Approach B (15.2) [918] <0.81> B (12.6) [370] <0.91>
Westbound Approach C (31.1) [625] <0.74> F (233.2) [m#2394] <1.49>
Northbound Approach B (13.0) [<25] <0.02> E (70.6) [67] <0.29>
Southbound Approach E (69.0) [#286] <0.92> F (231.6) [#577] <1.46>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach D (26.7) [40] <0.36> F (77.9) [<25] <0.20>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection D (37.5) D (45.1)
Eastbound Approach D (38.7) [#1280] <1.02> C (20.5) [381] <0.89>
Westbound Approach C (24.0) [345] <0.91> D (45.2) [m909] <0.99>
Northbound Approach D (51.5) [214] <0.60> F (171.7) [#606] <1.35>
Southbound Approach F (94.1) [#306] <0.97> D (49.3) [168] <0.34>
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection F (84.2) F (80.1)
Eastbound Approach F (94.6) [~1146] <1.16> D (54.0) [#842] <0.99>
Westbound Approach D (43.1) [#391] <0.90> D (44.6) [m539] <0.97>
Northbound Approach F (113.6) [#372] <1.13> F (137.9) [#466] <1.29>
Southbound Approach F (119.0) [#473] <1.09> F (178.8) [#506] <1.33>
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (20.2) E (57.5)
Eastbound Approach B (16.0) [257] <0.90> A (7.6) [m262] <0.76>
Westbound Approach B (12.0) [306] <0.69> D (38.2) [#1335] <1.01>
Northbound Approach F (82.7) [136] <0.58> F (259.8) [#208] <1.33>
Page 196 of 300
May 3, 2024
Page 19
Southbound Approach D (52.5) [249] <0.73> F (250.2) [#358] <1.61>
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection C (27.8) D (38.3)
Eastbound Approach B (15.6) [#1252] <0.91> B (13.7) [351] <0.71>
Westbound Approach D (36.7) [681] <0.55> D (47.7) [1072] <0.89>
Northbound Approach E (73.6) [254] <0.76> F (86.1) [#355] <0.89>
Southbound Approach C (32.7) [74] <0.36> D (49.5) [93] <0.68>
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn B (11.4) [<25] <0.01> B (17.2) [<25] <0.02>
Westbound Left Turn C (18.7) [<25] <0.02> B (13.6) [<25] <0.01>
Northbound Right Turn C (21.0) [<25] <0.03> C (15.9) [<25] <0.04>
Southbound Right Turn B (13.8) [<25] <0.06> C (19.5) [<25] <0.03>
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn C (17.6) [<25] <0.04> C (16.1) [<25] <0.17>
Southbound Right Turn B (12.7) [<25] <0.02> C (17.5) [<25] <0.04>
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection B (18.0) D (36.4)
Eastbound Approach A (3.5) [<25] <0.79> B (16.9) [#297] <0.93>
Westbound Approach B (19.2) [407] <0.51> D (38.4) [#951] <0.92>
Northbound Approach E (62.2) [112] <0.52> E (70.5) [#245] <0.82>
Southbound Approach D (54.9) [178] <0.71> E (67.7) [212] <0.86>
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un -signalized)
Eastbound Approach B (11.5) [<25] <0.00> B (13.8) [<25] <0.19>
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (9.1) [<25] <0.14> A (8.6) [<25] <0.17>
Southbound Left Turn C (19.7) [<25] <0.1> E (49.9) [58] <0.49>
Southbound Right Turn A (9.4) [<25] <0.05> B (14.1) [<25] <0.19>
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (8.3) [<25] <0.12> A (8.6) [<25] <0.06>
Northbound Left Turn C (16.2) [<25] <0.21> D (34.1) [160] <0.75>
Northbound Right Turn A (9.4) [<25] <0.08> B (10.6) [<25] <0.23>
Page 197 of 300
May 3, 2024
Page 20
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed F ($454) [50] <0.74>
Eastbound Right Turn C (21.7) [<25] <0.03> C (16.5) [<25] <0.04>
Northbound Left Turn C (19.4) [<25] <0.03> B (14.5) [<25] <0.06>
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (17.1) C (26.9)
Eastbound Approach D (46.0) [171] <0.71> C (24.5) [102] <0.35>
Westbound Approach C (23.8) [73] <0.44> E (55.3) [#376] <0.94>
Northbound Approach A (9.7) [136] <0.37> C (21.7) [443] <0.86>
Southbound Approach B (15.2) [670] <0.73> C (24.3) [434] <0.88>
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach E (46.3) [<25] <0.13> F (159.5) [30] <0.37>
Southbound Left Turn B (10.0) [<25] <0.02> C (16.8) [<25] <0.02>
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach E (47.3) [<25] <0.13> F (114.3) [33] <0.37>
Southbound Left Turn B (10.1) [<25] <0.04> C (16.7) [<25] <0.02>
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn D (27.7) [<25] <0.04> F (54.8) [<25] <0.14>
Westbound Right Turn B (11.6) [<25] <0.01> C (19.0) [<25] <0.04>
Southbound Left Turn B (10.3) [<25] <0.07> C (16.7) [<25] <0.04>
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn D (29.0) [<25] <0.07> F (54.8) [<25] <0.14>
Westbound Right Turn B (11.7) [<25] <0.01> C (19.0) [<25] <0.04>
Southbound Left Turn B (10.5) [<25] <0.08> C (16.7) [<25] <0.04>
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection B (10.8) B (18.7)
Eastbound Approach C (33.2) [81] <0.31> D (51.4) [241] <0.82>
Westbound Approach D (48.8) [152] <0.69> C (30.4) [115] <0.50>
Northbound Approach B (10.9) [240] <0.37> B (19.0) [585] <0.72>
Southbound Approach A (4.6) [149] <0.69> A (7.3) [233] <0.66>
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn D (33.5) [<25] <0.09> F (55.4) [<25] <0.33>
Westbound Right Turn B (12.0) [<25] <0.02> C (20.0) [<25] <0.24>
Southbound Left Turn B (11.5) [<25] <0.21> B (14.6) [<25] <0.03>
Page 198 of 300
May 3, 2024
Page 21
29: Palmetto Bay Rd & William Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection F (56.0) F (60.3)
Eastbound Approach F (83.3) [375] <1.04> F (117.9) [550] 0.98>
Westbound Approach D (26.1) [200] <0.79> F (92.4) [425] <1.08>
Northbound Approach C (16.4) [125] <0.65> F (78.2) [525] <0.98>
Southbound Approach F (134.4) [900] <1.23> F (94.3) [675] <1.13>
# – 95th Percentile volume exceeds capacity
$ – Delay more than 300 seconds
m – Upstream metering is in effect
VISSIM Analysis
The travel time calculations and traffic volumes between the 2023 existing conditions and 2045 no build
conditions were evaluated. As shown in Table 7 and Table 8, several corridors and locations have negative
percent differences and the 2045 no build simulated volumes are less than the 2023 simulated volumes.
This is due to over-saturation of the study area and results in vehicles not being able to enter the netwo rk
to process through each intersection. During the AM peak hour, the eastbound travel time is expected to
increase by approximately 36% along Hilton Pkwy between Moss Creek and Indigo Run and by
approximately 46% along Hilton Pkwy at Moss Creek to Cross Island Pkwy at Sea Pines Circle. During the
PM peak hour, the westbound travel time is expected to increase by approximately 23% along Hilton
Pkwy between Moss Creek and Indigo Run and by approximately 62% along Hilton Pkwy at Moss Creek to
Cross Island Pkwy at Sea Pines Circle. Therefore, it is evident that the study area is expected to experience
significant congestion through the year 2045.
TABLE 7. 2045 NO BUILD VISSIM CALIBRATION TRAVEL TIME RESULTS
Corridor
Existing
Simulated travel
time (secs)
2045 No Build
Simulated travel
time (secs)
% Difference
AM PM AM PM AM PM
William Hilton Pkwy between
Moss Creek and Indigo Run
EB 1157 619 1579 642 36.47% 3.72%
WB 572 1252 584 1544 2.10% 23.32%
William Hilton Pkwy @Moss
Creek to Cross Island Pkwy @Sea
Pine
SB 1356 857 1984 873 46.31% 1.87%
NB 826 1520 823 2465 -0.36% 62.17%
Page 199 of 300
May 3, 2024
Page 22
TABLE 8. 2045 NO BUILD VISSIM CALIBRATION TRAFFIC VOLUMES RESULTS
Location
Existing
Simulated
volume results
(vehicles)
2045 No Build
Simulated
volume results
(vehicles)
% Difference
AM PM AM PM AM PM
William Hilton Pkwy west of Squire Pope
EB 2970 2240 2783 2524 -6.30% 12.68%
William Hilton Pkwy west of Squire Pope
WB 1650 2898 1843 2754 11.70% -4.97%
William Hilton Pkwy east of Spanish Wells
EB 2929 1955 2748 2198 -6.18% 12.43%
William Hilton Pkwy east of Spanish Wells
WB 1423 2614 1570 2413 10.33% -7.69%
Cross Island Pkwy north of Marshland Rd
NB 964 1371 1065 919 10.48% -32.97%
Cross Island Pkwy north of Marshland Rd
SB 1486 1167 1440 1299 -3.10% 11.31%
The 2045 no build operating conditions at the study intersections were evaluated using VISSIM and are
summarized in Table 9. As shown, the operating conditions largely agree with those shown in the 2045 no
build Synchro operating conditions (Table 6) and validate the travel time and volume conclusions above.
Significant congestion is expected throughout the study area through the year 2045. The congestion that
currently exists throughout the study area is expected to be exacerbated by 2045 with the forecasted
growth.
TABLE 9. 2045 NO BUILD OPERATING CONDITIONS (VISSIM)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection C (22.3) B (15.9)
Eastbound Approach C (26.6) [123] {700} B (18.5) [43] {241}
Westbound Approach B (14.0) [<25] {168} B (14.4) [32] {218}
Northbound Approach B (14.1) [<25] {68} B (14.5) [<25] {53}
Southbound Approach A (6.6) [<25] {56} A (8.5) [<25] {83}
Page 200 of 300
May 3, 2024
Page 23
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection E (74.1) B (18.6)
Eastbound Approach F (146.0) [1628] {1658} B (16.6) [86] {567}
Westbound Approach B (14.1) [37] {302} B (18.4) [86] {474}
Northbound Approach C (26.4) [25] {186} D (39.3) [<25] {91}
Southbound Approach D (35.8) [<25] {88} C (24.4) [<25] {119}
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (un-signalized)
Eastbound Left Turn F (54.8) [1075] {1304} C (18.8) [<25] {55}
Westbound Left Turn F (4,646.8) [142] {214} B (12.4) [<25] {45}
Northbound Approach B (12.3) [<25] {63} A (7.4) [<25] {62}
Southbound Approach D (29.4) [49] {107} A (8.1) [<25] {77}
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn F (3,675.2) [85] {146} C (19.0) [<25] {34}
Northbound Approach F (3,448.2) [171] {189} C (18.4) [<25] {43}
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (20.9) [902] {1658} D (26.6) [<25] {<25}
Westbound Left Turn No volumes observed C (21.4) [<25] {<25}
Northbound Approach F (426.9) [<25] {38} C (20.6) [<25] {47}
Southbound Approach No volumes observed C (17.5) [<25] {42}
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed F (131.6) [<25] {<25}
Northbound Approach F (2,505.2) [214] {351} E (49.9) [<25] {74}
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection A (9.5) B (13.4)
Eastbound Approach B (11.3) [433] {1093} B (10.6) [216] {1092}
Westbound Approach A (5.3) [26] {601} A (6.0) [86] {913}
Northbound Approach D (41.6) [<25] {138} F (237.4) [193] {326}
Southbound Approach A (9.8) [<25] {<25} A (0.0) [<25] {<25}
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn B (14.4) [<25] {<25} D (32.0) [<25] {33}
Southbound Approach D (29.2) [<25] {47} E (43.5) [<25] {62}
Page 201 of 300
May 3, 2024
Page 24
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection C (26.8) E (70.7)
Eastbound Approach D (38.4) [361] {1332} B (13.9) [235] {1106}
Westbound Approach A (8.4) [55] {700} F (128.0) [1018] {1383}
Northbound Approach C (21.2) [<25] {42} E (67.4) [<25] {73}
Southbound Approach B (19.2) [<25] {189} F (80.3) [228] {693}
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach A (1.4) [<25] {26} A (8.0) [<25] {29}
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (30.3) F (328.8)
Eastbound Approach C (25.2) [169] {787} B (15.1) [98] {668}
Westbound Approach B (15.5) [80] {365} F (637.7) [896] {989}
Northbound Approach E (63.1) [122] {407} F (510.5) [1241] {1288}
Southbound Approach F (147.4) [192] {319} D (49.1) [51] {243}
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (51.9) E (76.0)
Eastbound Approach D (43.1) [838] {1562} D (50.4) [254] {711}
Westbound Approach C (31.2) [128] {375} E (76.3) [1203] {1623}
Northbound Approach D (38.8) [166] {334} F (92.7) [280] {356}
Southbound Approach F (143.1) [1039] {1452} F (121.3) [657] {1380}
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (22.3) C (33.4)
Eastbound Approach B (17.7) [169] {962} B (12.6) [51] {552}
Westbound Approach C (21.5) [106] {673} D (42.5) [907] {1289}
Northbound Approach E (67.4) [42] {178} F (281.4) [153] {297}
Southbound Approach D (36.9) [65] {225} C (25.8) [32] {153}
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection C (22.1) E (55.1)
Eastbound Approach B (17.8) [227] {1081} B (18.9) [99] {679}
Westbound Approach B (19.5) [72] {553} D (54.5) [998] {1279}
Northbound Approach D (52.8) [71] {260} F (260.2) [397] {719}
Southbound Approach C (31.1) [<25] {87} D (43.2) [<25] {114}
Page 202 of 300
May 3, 2024
Page 25
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn B (13.4) [<25] {<25} C (21.6) [87] {146}
Westbound Left Turn C (22.4) [<25] {25} C (21.8) [<25] {<25}
Northbound Right Turn C (16.2) [<25] {29} B (12.6) [<25] {31}
Southbound Right Turn B (12.3) [<25] {44} F (2,448.4) [87] {171}
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn A (8.1) [<25] {<25} A (6.9) [<25] {64}
Southbound Right Turn B (11.0) [<25] {36} F (1,211.0) [123] {244}
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection C (24.5) E (66.7)
Eastbound Approach B (19.7) [107] {764} C (34.5) [115] {636}
Westbound Approach B (17.3) [53] {371} E (75.8) [1341] {1658}
Northbound Approach E (55.2) [32] {110} E (76.4) [65] {265}
Southbound Approach D (47.7) [57] {203} F (126.4) [327] {1023}
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un -signalized)
Eastbound Approach A (9.7) [<25] {45} B (12.1) [<25] {72}
1