City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
2026 ISLE OF PALMS
City Council Update
November 10, 2026
City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
Construction Milestones
July 7, 2026
Mobilization to IOP began
July 16, 2026
Subline landed in Reach 2
July 25, 2026
Dredge mobilized to borrow area
July 27, 2026
First material pumped on shore
City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
Reach 1 - Completed
900,000 cubic yards
Completed Jul 27 – Aug 30
Production averaged 26,500 cy/day
Up to 700 feet of dry-sand beach post-construction
City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
Reach 2 - Completed
800,000 cubic yards
Completed Aug 31 – Nov 7 (17-day weather delay)
Production averaged 11,800 cy/day
Up to 600 feet of dry-sand beach post-construction
City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
• Reach 3 sand placement begins today
• Placement of 800,000 cy between Breach Inlet and the Pier.
• Fill plan adjusted to accommodate environmental permit windows
• Work will occur 24/7 - expect backup alarms and vibration (monitors in place)
• Fill Zones 1 & 2 expected to be complete by Dec 14. Fill Zone 3 by early Jan.
Fill Zone 1 Fill Zone 2 Fill Zone 3
Reach 3 – Implementation Underway
City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
Sand Fencing & Planting
Fencing installation begins today, and will
continue through this week
Planting will mobilize Sunday and is expected
to be complete by the 21st
Plants will take 1-2 years to mature to full size
City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
• The nourishment fill will adjust to a natural profile – reduction in berm
width as material shifts lower in the beach profile
• Sand will lighten over time
• Wind-blown sand will start to accumulate on and around the dune areas
• Storms and king tides will overtop the flat berm and may create ponding
• Visible sand quality will improve as natural sorting of grains occurs
• Private work may be required to touch up sand around walkovers/access points
• Walkover extensions may be warranted, allowable without permit under SC Regs
Post-Project Expectations
City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
• https://www.isleofpalms.gov/city-managed-beach-
restoration-projectsContinued beach monitoring
• Click top banner on isleofpalms.gov
• Instagram/Facebook
Beach Project Info.
City Council Update for Isle of Palms Renourishment (10 Nov 2026) Coastal Science & Engineering, Inc.
Post-Construction
Thank You!
Source: City of Isle of Palms website. First collected Nov 14, 2026.