TRAFFIC AND TRANSPORTATION COMMITTEE
October 27, 2026
A meeting of the Traffic and Transportation Committee was held on this date , beginning at 3: 0 3
p.m. in person in the Council Chambers at 80 Broad Street and over Zoom.
Committee Members: Councilmember Michael Seekings (Chair), Councilmember Karl Brady
(Vice-Chair) (virtual) , Councilmember Leslie Skardon, Councilmember Jim McBride,
Councilmember Boyd Gregg (virtual) , and Mayor William Cogswell
Also Present : Michael Mathis, Hampton Logan, Bay Sheehan, Deja McMillan, Melissa Cruthirds,
Julia Copeland, Magalie Creech, Liz Dieck, Shannon Elliot, and Donna Constance
Chair Seekings called the meeting to order
Invocation
The meeting was opened with a moment of silence led by Chair Seeki ngs.
Approval of the August 18 , 2026, meeting minutes
On a motion by Mayor Cogswell, seconded by Councilmember McBride , the Committee voted
unanimously to approve the August 1 8 , 2026, Traffic and Transportation meeting minutes.
Lowcountry Lowline project update
Mr. Anderson said he was the project manager with Capital Projects. They were working on the
Lowline Project. Gulfstream was removing soil and bringing in clean soil to backfill as they went.
They received final pricing for the GMP they want to bring to council in December to get the
improvement package started and start moving it down from Mt. Pleasant Street to Bradford Park.
Chair Seekings asked whether this was breaking ground on phase one.
Mr. Anderson said they were starting in Mount Pleasant and moving south.
Chair Seekings asked whether they had a timeline for the general project.
Mr. Anderson said the completion date was July of 2028.
2
Chair Seekings asked if that was 18 months for phase one.
Mr. Anderson said that was for everything except Bradford Park.
Mayor Cogswell said they needed to make a decision in partnership with Friends of the Lowline.
Friends of the Lowline had been instrumental in advancing the original vision. They were currently
running a fundraiser. They were deciding whether to include the Lowline and Bradford Park or
just the Lowline. They were considering proceeding with the Lowline and waiting to see if they
would raise the remaining funds to complete Bradford Park. The Mayor thought it made sense to
build it all at once because it would avoid mobilization costs and general conditions. The City could
bridge the gap through the Cooper River TIF to complete Bradford Park while raising funds, then
be reimbursed for that amount. The Mayor wrote a letter to Friends to see if they would be open
to this, given the risk, and to gauge their response. Then the committee could decide or
recommend it to council. They were working on an MOU with Friends of the Lowline for
programming on the Lowline, mainly for Bradford Park. They asked for naming rights to help raise
money, and the City was not opposed . If a particular donor or corporation wanted to give and
have naming rights, the City was open to those suggestions, but thought it would need to come
through City Council rather than granting that authority to an entity not directly run by the City.
Chair Seekings asked whether Bradford Park was on the Capital Project side, whether it was fully
designed, and whether it would be ready to proceed if added to this project.
Mr. Anderson said yes, and it was fully designed.
Chair Seekings said it would be helpful if they could refresh their recollection of the project.
Mayor Cogswell said they could get them the plans for both Lowline and Bradford Park.
Chair Seekings asked about the division of funds to the project if Friends of the Lowline made a
specific percentage commitment, and how their fundraising would compare to the project's total.
Mayor Cogswell said they were nearly $3 million short, as explained in the letter. They are on a
good trajectory and should be able to raise that sum within the next 12 to 14 months, in time for
the July 2028 opening. That amount would be reimbursed through the Cooper River TIF.
Chair Seekings asked whether the $2.5 million or the $3 million would cover everything, including
the park in phase one.
Mayor Cogswell said that when delays occur for any reason, the risk of escalating costs is such
that, when interest is considered, they could lose the funding in the Cooper River Bridge TIF; it
would be worth moving forward, locking this down, and getting it built.
Chair Seekings said inflation was a steeper curve than the interest they would earn on that money.
He asked whether Gulfstream would handle all the site work and then turn it back to Edifice. He
asked whether Edifice was still their contractor.
Mr. Anderson said they were the general contractor, and Gulfstream was a sub.
Councilmember Skardon asked whether the letter included the plan and pictures, and what it
would look like to help visualize what this would be.
Mayor Cogswell said they can get that information to them.
3
Request approval of a Resolution and Municipal Agreement with the South Carolina
Department of Transportation for intersection improvements at SC Highway 41 and
Reflectance Drive/Halfway Creek Road .
Mr. Mathis said members of the SCDOT are here from Columbia. Mr. Riddle gave a presentation
about the project and what their plans are.
Mr. Riddle said he was a program manager for the Traffic Safety Office at SCDOT and wanted to
discuss the intersection of SC41 and Reflectance Drive and what they proposed. Their office
administers the Highway Safety Improvement Program (HSIP), a federal program that provides
funding for safety improvements statewide. They focus on improving safety at intersections and
other locations. For a location to be eligible for HSIP funding, it must address a priority in the
Strategic Highway Safety Plan, such as intersection safety. It must be identified through a data-
driven process and contribute to reducing fatal and serious injury crashes. The data-driven
process tracks everything about a location: the number of crashes and their severity. They know
which countermeasure is cost-effective, and a before-and-after study is conducted for every
project to ensure the countermeasure is working.
The intersection at SC41 was a two-lane minor arterial with about 5,400 vehicles per day and a
55-mph speed limit. Reflectance Drive was a two-lane local road with about 5,300 vehicles per
day, and 5% were large trucks. The intersection was a two-way stop with no left turns on any
approach. This intersection had a higher-than-average crash rate. From January 2023 to July 4,
2026, there were 54 crashes; 48 were right-angle crashes. Right-angle crashes had the potential
to be severe and cause an injury or a fatality. Most crashes occurred during the day under dry
conditions. After it was on their radar, they initiated a project and had it approved by their
commission to proceed with an analysis. They hired a consultant to conduct a traffic analysis
study. The study examined three alternatives: a single-lane roundabout, a new traffic signal, and
closing access to SC41 from Reflectance Drive. The study showed that the roundabout was the
safest option. A roundabout is a circular intersection where traffic flows counterclockwise around
a central island with no traffic signals or stop signs. It was controlled by a yield sign. Roundabouts
were replacing traditional intersection improvements because they were safer and enhanced the
operation of the intersection.
They installed 35 roundabouts statewide, with 20 more under development or construction. Their
office had been installing them for 15 years and had performed well in reducing crashes. They
achieved an average 66% crash reduction after installing them. Injury crashes fell by an average
of 79%, and fatal crashes were eliminated. They conducted before-and-after studies for every
location and analyzed three years of crash data. After the roundabouts were built, they went back
and conducted an after study, in which they looked at three years of crash data after the
installation. They looked at traffic signals. The roundabouts were the safest option because of the
removal of the conflict points that a traffic signal did not. The roundabout project would eliminate
the skewed alignment of the intersection and increase safety.
The project had developed preliminary plans and was under review. They held a public meeting
on September 10th at Philip Simmons Middle School. They had 49 attendees and received 41
comments; most of those comments were in favor of the roundabout. They planned to complete
the design and start the right-of-way acquisition in early 2027. They hoped to start construction in
early 2028, and the project would take about 18 months to build. The estimated cost was $4.3
million and was federally funded.
4
Chair Seekings asked whether this was right on the line between the City of Berkeley and the
County Line .
Mr. Riddle said yes, the line was close to the intersection.
Chair Seekings said the roads approaching that intersection had high speed limits. He asked
whether they had considered lowering the speed limit approaching the intersection.
Mr. Riddle said that was an option, but roundabouts were designed for high-speed routes, even
in rural areas.
Chair Seekings asked whether it would be 2028 before the roundabout was put in and whether it
made sense to put in signage.
Mr. Riddle asked about lowering the speed limit or putting in signage.
Chair Seekings said both.
Mr. Riddle said it was not people running the stop sign, but people not understanding that it was
not an all-way stop.
Councilmember Gregg said this intersection receives the most complaints and that they have
witnessed many accidents, including the fatality that was mentioned. He was glad they were finally
addressing this.
On a motion by Mayor Cogswell, seconded by Councilmember Gregg, the Committee voted
unanimously to enter into the municipal consent agreement with SCDOT regarding intersection
improvements at SC 41 and at Reflectance Drive/Halfway Creek Road.
Request approval of MOU between the City and Millstone Ventures, LLC for the developer ’s
contribution towards future intersection improvements at the intersection of Wildcat Boulevard
and William E. Murray Boulevard.
Mr. Mathis said this was for the developer's contribution to help complete the design plans, or at
least get them close to completion, for a potential roundabout at this location. The intersection
improvements were not yet funded, but funding would be sought after the design plans were
completed.
Chair Seekings asked whether they knew what the cost of this project would be.
Mr. Mathis said the cost of a roundabout was about $4.3 million. He did not think this roundabout
would be that expensive because this was a smaller intersection.
On a motion by Mayor Cogswell, seconded by Councilmember Gregg, the Committee voted
unanimously to approve an MOU between the City and Millstone Ventures, LLC, for the
developer ’s contribution to be used for future intersection improvements at the intersection of
Wildcat Boulevard and William E. Murray Boulevard.
Request approval of MOA between the City and Southeastern Recapitalization Group, LLC
for the developer ’s contribution of property for potential future intersection improvements at
River Road and Murraywood Road/ Rushland Landing Drive.
Mr. Mathis said the developer would donate a piece of property , critical to future improvements at
the intersection of River Road , Murraywood , and Rushland Landing. The intersection was
5
currently misaligned. This property would help them preserve the area so they could align the
intersection properly in the future.
Chair Seekings asked if this was an alignment issue.
Mr. Mathis said yes.
Councilmember McBride said River Road had been on his radar since he became Councilman.
This was one of many things happening , or could happen, and it would allow for improvements.
This did not mean there was no funding for the alignment, but without acquiring this land now,
they would lose the opportunity to realign it in the future. They have been working with the county,
and Councilman Boykin notified him and the county staff to work with them on potential future
funding. The elementary school that opened a year and a half ago added a roundabout in front of
the school with help from the Mayor, Representative Teeple, the SCDOT, and CCSD. S tormwater
ditches were added on either side of the roundabout, which improved safety. Representative
Wetmore and Representative Stavrinakis secured state funding for a future roundabout.
Construction was set to start within the next six months at Brownwood and River Road. This would
allow the Rushland Landing neighborhood, once realigned, to exit the neighborhood safely and
allow potential improvements to that intersection.
Chair Seekings asked if the alignment of the intersection would be a county project or the City ’s.
Mr. Mathis said the county.
Chair Seekings said securing the land would be the first step.
Mr. Mathis said yes.
On a motion by Mayor Cogswell, seconded by Councilmember Skardon, the Committee voted
unanimously to approve an MOA between the City and Southeastern Recapitalization Group,
LLC, providing for the developer ’s contribution of property for potential future intersection
improvements at River Road and Murraywood Road/ Rushland Landing Drive.
Chair Seekings said he thought the naming rights were interesting. He walked the length of the
Highline in New York and the Underline in Miami and thought they were visually interesting and
effective at commemorating. If they were going to have naming rights, they needed to consider
how it would fit into the overall picture, look, and branding of the Lowline. The Underline and the
Highline did it differently. They needed to ensure the messaging and branding were consistent.
Mayor Cogswell agreed and said he would share the branding package that Friends of the Lowline
provided. He did not want to offer an opinion on the branding itself, but they would like to see the
City of Charleston referenced in it, since it was their park.
Chair Seekings said they needed to think about this if they were going to start building out and
have this done in 18 months.
With there being no further business, the Committee adjourned the meeting at 3:30 p.m.