WEST ASHLEY REVITALIZATION COMMISSION
March 8, 2023
The regular meeting of the West Ashley Revitalization Commission was held this date at 5:30 p.m. at T he
Reserve in Citadel Mall , 2070 Sam Rittenberg B oulevard.
Notice of this meeting was sent to all local news media.
PRESENT
Councilmember Peter Shahid, Chair, John deStephano, St. Andrews PSD, Justin Ferira, Diane Hamilton,
Drelle Parker , County Councilman Brantley Moody, Kenneth Marolda, Matt Moldenhauer, Charles Smith,
Amiee Sutton, and Councilmember Keith Waring. STAFF: Eric Pohlman, We st Ashley Project
Coordinator , Jim Hemphill, Planner . Also present: Councilmember Ross Appel
City of Charleston Stormwater Updates – Matt Fountain, Director Stormwate r Department
a. West Ashley Projects
Forest Acres Drainage Improvement Phase 2
o Phase 1 , West Ashley Bikeway Reconstruction – completed lat e 2018, drainage work
under St. Andrews Boulevard, realignment o f the box culverts
o Phase 2 started construction towards the end of last year; they ha d a three to six month
period in the contract ; earlier than that was a contract to procure supplies due to the
logistics , the contract started earlier than that but construction work started late last year
o They were working through Phase 2 , which was split into Phase 2 A and Phase 2B ; it
was all under the same $1 1 million construction contract ; it tied in the remainder of the
drainage area
o The Forest Acres neighborhoods (Phase 2) were the areas of heavy flooding ; they w ould
be increasing the size of the existing drainage canal, and upsizing the infrastructure
under Playground Road, which currently had a very small pipe compared to the box
culvert that was needed
o As some of those canals widen out to a point where an open canal was no longer
sustai nable with the slopes and easement, some of those were going in to closed box
culverts that connected to the upper reaches , hence the cost of the project
o Phase 2 started in the fall of 2022; they have completed the tree removal, the majority of
water and sewer relocations, and they were finishing up some of the Comcast /ATT
relocations
o A lot of road closures impacted Playground Road ; the road wasn ’t big enough to keep
open; since it was a major road, DOT (Department of Transportation) said it could only be
closed at night , so there will be a total closure o n Playground Road for a short period of
time while they were doing the major box culverts ;; that would happen later in the middle
of this year
o Drainage infrastructure installation was planned to start spring 2023 , this was where they
start working in the actual canal system after they got everything else out of the way ; the
Playground Road closures would be around the middle of th is year , the least impactful
time from a school ’s perspective
o Phase 2 A would be completed in late 2023 and they would go into Phase 2B as they
were completing Phase 2A
o 2A was the section that tied into the Bikeway and came across Playground Road; that
initial infrastructure always started downstream so you don ’t bring more water to an area
before it was prepared to receive that water and caused flooding
West Ashley Revitalization Commission
March 8, 2023 Page 2
o Phase 2B was open channel work combined with some box culverts connecting into the
upstream sections
Dowden Area Project
o Smaller project but a large project area; in the southern portion Ashley Landing Mall
much of that water there and to the left of it all flow ed through a drainage system into an
open canal, and then across Old Towne Road into an open marsh system near Charles
Towne Landing
o What had happened was a lot of development occurred without any drainage
infrastructure associated with th os e development s before stormwater regulations so all of
that water hit some relatively small pipes and caused a lot of flooding because it couldn ’t
get out
o They went back to the drainage model for this area according to the survey , built some
improvement options, tried to looked for relatively inexpensive , really high value in the
area ;
o T hese were called small project allocation where Council allocated a million dollars per
year of stormwater funds that get used in these roughly $100 thousand scale projects to
do quick and immediate improvements rather than the 5 or 10 year typical major capital
project that tend to be in the million s of dollar range
o The drainage model showed they had the potential for significant flood reduction s by
improving the ability of that open canal and how well it flowed into the existing pipe work
under Old Towne Road; originally they assumed they were going to upsize the pipes
under Old Towne Road and add new pipes , which was challenging in this area as there
was an enormous Charleston Water S ystem (CWS) water sewer line that came through
this section that would have been very expensive to move or relocate
o But w hen they ran the modeling , they saw there was a good network of pipes under Old
Towne Road; they were able to uncover some that had been somewhat buried and the
geometry of that channel had shifted over the years to where the water wasn ’t really
entering the pipes cleanly; it came down the system, took a turn and try to bend through
the pipe network
o They came back with their field operations crew; they ac quired some easements and
some homeowners were willing to dedicat e easements
o They removed vegetation that had grown and caused the canal slope to slump down into
the channel ; they cleaned out the channel, re-stabilized the whole thing , re -established
the canal going into conflict boxes , not box culverts , that enter into a pipe network that
flowed under the road through the utility structures ; they were looking at seeing some
significant improvements when the area gets the summer rains
o Mr. Fountain added this area got a lot of attention from the sanitary overflows from the
flood ing so CWS was partnering with them on this; to the south of the city ’s drainage
work , CWS was beginning construction on a new sewer lift station to improve sewer
service in this are a
Chair Shahid asked Mr. Fountain what was the expected completion date.
Mr. Fountain said the stormwater permits were done. CWS had another three to six month s on the
completion of their lift station.
Chair Shahid asked what was the cost of the work.
Mr. Fountain said there was about $50 thousand dollars of consulting work. They did the rest inhouse .
There was some material purchases around $20 thousand . If they had hired a contractor it would have
been approximately $1 00 or $2 00 thousand dollars for the work they accomplished .
West Ashley Revitalization Commission
March 8, 2023 Page 3
Councilman Moody asked (1) as Ashley Plaza Mall and the c ity ’s Pig site continue to evolve would this
be able to support that and (2) acr oss Old Towne Road , Charlestowne and Charlestowne Estates
continue to have issues. He thought a lot of it was CWS related but he believed Mr. Fountain could speak
to that as well.
In reference to his first question, Mr. Fountain said for redevelopment , the way the City ’s stormwater
manual worked was if th e re was any land disturbance on the parcels redevelopers worked on , they will
have to reduce how much volume of water was coming down that system . The southern side of the
shopping center flowed directly into the most constricted limited side of the ditch . That would be the
biggest improvement that one would see in redevelopment in that area .
The northern section, like Sumar Street, flowed down through the Old Towne Road system, which wasn ’t
quite as constricted but still flowed to that ultimate final connection through Old Towne Road. That was
part of the reason they changed th at design change manual to prevent exactly what Councilman Moody
said . They applied it to an improvement project.
In reference to downstream flooding, they did look a few neighborhoods that had some problems. There
were some challenges as you get closer and closer to the marsh you get lower and lower elevations. He
thought this was a location they looked at for adding additional outfall, which was another small project.
The challenge with adding a new outfall was always getting easements through people ’s yards. It was a
cost effective way to improve drainage. It was difficult to get people to agree to let you put a drainage pipe
through the side of their lot.
CWS had lift stations that was supposed to help much of the area in this region. It wasn ’t just focused on
Dowden . They had a Lenevar lift station. It should provide some general relief across the area but it was
something they still had to go and do as future projects.
Mr. Moldenhauer , a resident of Lenevar, said right after the hurricanes he went down to this area and
uncovered sewage coming from the manholes and the boxes in that area , which were to the left out of
sight of the black box. There was a box open canal connected to it and there was some ditches that fed
into that box. He said the boxes were a bottleneck . He had seen debris and branches and wasn ’t sure if it
had been cleaned out. He was also familiar with the flooding issues in the area.
He said he wasn ’t complaining, he was offering some insight where he thought the problems were. He
didn ’t think there was redundancy in the network in the neighborhood so there wasn ’t self-leveling
happening within the stormwater within the neighborhood. He thought the box was problematic and
wasn ’t sure if it needed to be there. It might be creating more problems than it was solving.
Mr. Fountain said the Dowden basin was the focal point of this project work. CWS was working with the
sanitary sewer primarily in Lenevar, where they will see secondary benefits in Dowden . He thought it was
a good point to look at some of that other drainage if Mr. Moldenhauer was seeing some bottleneck in
that area and see if they could follow on a maintenance effort to see if they could improve the tie-in to the
rest of the system.
Chair Shahid noted one of the problems that generated their discussion and his pushing to have this done
was at the cul-de-sac Mr. Moldenhauer referenced . Rain bombs that occurred in 2018 or 2019 caused the
backup of the sewer. Councilman Moody ’s comment about across the street at the other section of
Charlestowne Estates off Donahue that had extreme problems with backflow of sewers was all somehow
connected to this. They did have a discussion about 2 or 3 months ago with what CWS was doing with
their upgrades on their sewage lines, including Old Towne Road. He hope d all of this tied in with one
another and alleviate d the issues brought up by Mr. Moldenhauer as well.
East/West Oak Forest Drainage Plans
o This was a basin to the south of the primary service are a for the East and West Oak
Forest ; the system was behind insurance agency across the street from the Baptist
church
o All of East and West Oak Forest drainage was trying to flow through an undersized older
ditch system that sat in an area behind Shelley Road starting in Oak Forest and went
West Ashley Revitalization Commission
March 8, 2023 Page 4
under Highway 17 , through the parking lot of the Baptist church, turns and came down a
much more open marsh section through the Greenway and out into the truly open marsh
o The system was obviously undersized as d uring a heavy rain event, you would see
flooding in the church parking lot, in the upstream area of Shelley Road, and in Oak
Forest areas , where later on he would talk about flood prone properties the City had
acquired that had repetitive losses
o H ere they were trying to figure out ways to improve the system and , similar to what they
saw in Dowde n, they were spending a lot of effort on building incremental improvements
that led to bigger projects rather than waiting 10 or 15 years to fix the area as a major
capital project once they get allocated funded
o For the short term, they were doing some initial hydrology studies to look at how big the
pipes needed to be, what the ditch needed to look like in order to be able to drain the
water
o They were working to acquire some easement ; he noted that the church had been good
to work with and was interested in potentially dedicating easement because that drainage
system that runs through their churc h had no public easement on it, which meant
stormwater couldn ’t maintain it or do anything outside an extreme emergency event like
safety issue
o Once they have the easement , they would go in with the Army Corps Engineers and do
the permitting process to build a clean open marsh drainage channel; upgrade the pipes
in the church driveway and do maintenance with permits moving north of that system as
they clean up the downstream buildup rating or water rating wa ter more efficiently
o The longer term look was to see whether the culvert under Highway 17 needs to be
upsize d , if anything needed to be upsized under the Greenway , and if under the
Greenway needed to be upsized it would likely be a combination of ti de protection into
the upsizing; you couldn ’t limit the inflow of salt water more than it was currently limited
because you didn ’t want to damage the marsh without mi tigation, it was a n environmental
permitting ; but you could add outflow capacity without allowing more water i n so you
could still get water out faster
o These projects were larger scale projects , once you ’re talking about putting pipes under
Highway 17 one was talking about millions of dollars ; but they were looking to see what
could be done in the short run that would provide immediate relief to flooding in the
neighborhood, try to bring down how deep the flooding was and try to make flooding not
occur so frequently; they wanted to have afternoon rain bombs and not see water in
people ’s yards or houses
o At Oak Forest and Keats, they acquired two residential properties in that area, they ’ve
already demolished the structures so they ’re vacant properties; they ’ve done design work
to do rain garden retrofits on the properties where they changed the grading on the site
and replant the sites with a forested look and try to uptake more water
o In no way would these fix flooding, they were very small projects for a very large basin ;
they were small improvements to make the o verall project needed to be do ne smaller and
cheaper; in the short run, they still provided some benefit in that it kept people from
purchasing flood prone homes ; they worked with the Federal government on these 75 /25
or 90 /10 possible at grant for the acquisition
o The second acquisition was on Shelley Road; this one was different, it was still
undercutting to add some storm water storage do some more uptake; it was also adding
maintenance pathway back to th e major ditch system that exists back there as it doesn ’t
have any way to access it other than driving through residents ’ yards
West Ashley Revitalization Commission
March 8, 2023 Page 5
o This was a two-fold acquisition in that it gave them a way to get heavy equipment back
there to maintain the ditch , which they previously had to do mostly by hand, and also let
them plant the rain garden and have some other minor improvements in th e area
They have done some outreach in neighborhoods and have gone to some farmers ’ markets . They were
still waiting for construction on these until the fall so they had to hit when there was a decent planning
season. The y were supposed to be nice looking neighborhood amenities in addition to being stormwater
features.
This was a basic summary of what he talked about – looking through the pathway head, finalizing the
easements, obtaining permits, going through and clean, doing the retrofit properties and try ing to
reassess from , a capital project standpoint , they needed to for something about Highway 17 around the
Greenway for the next s tep in improvements .
Citadel Woods /Wildwood Update
o The area was at the top of Air Harbor moving into Citadel Woods neighborhood and
going north of there into the Wildwood Townhomes
o The drainage from the northern part of Air Harbor and Citadel Woods all try to drain north
through the Wildwood Town Homes under another property, old railroad track, through
the Ruby Tuesday , across 17 up that system into the large canal that runs south of
Citadel Mall, under I-526 past Costco, down the street through the car dealership, turns
left and comes down back under Highway 17, then out under the Greenway by Orange
Grove Charter School and the rest of the way out into the marsh , a very long way to bring
water with almost no elevation change , hence a lot of flooding
o They have been looking at some alternative s out there; they have built some temporary
project s , one of which was in collaboration with the County, who had been doing a lot of
work in the area with the C it y; there was an overlap of jurisdiction – the County had a lot
of Air Harbor, the City had a lot of Citadel Woods
o The charge from stormwater has been cleaning out the system, installing some much
improved channels to connect into the existing northern ou tfall; the City has added some
storage in collaboration with all the townhome s, who provided their drainage easement in
this area for free to lighten the flooding that increased on their parcel
o T he County has been working with a consultant to figure out if there was a better option
to come down the Greenway with the outfall and skip entire the pathway through the
Citadel Mall drainage system, which already had challenges in flooding ; you would get
much better drainage for Air Harbor , Citadel Woods , Wildwood Townhomes and take that
load off the Citadel Mall system, which was the whole Dupont-Wappoo watershed that
floods on Dupont, Wappoo and most of the neighborhoods within that basin
o They added some drainage ditches and storage systems to drain the water more
efficiently out of the areas that currently flooded into the drainage system
Windermere Project
o Neighborhood project, p rimarily old Windermere but they made some improvements in
the surrounding areas as well
o This system was extremely constricted and challenged; the County have a library , one of
the more popular libraries in the area, that flooded repeatedly; the shopping center ,
Windermere Road had flooding challenges; many of the roads flood regularly making
them impassible during rain events and high tides
o The city took a more layered approach on this project; William Ackerman Road was one
of the lower more flood prone road s , they added check valves and some minor berming
along that system that kept the water during high tides events from flooding Ackerman or
Windermere up to a certain level of service; if the tide was high enough, it would come up
West Ashley Revitalization Commission
March 8, 2023 Page 6
and over the land , and over the berm and it would still cause flooding, but there would be
much less frequent flooding
o The outfall to the south through the marsh was heavily constricted; it caused flooding on
Folly Road, some of the northern and eastern portions of this neighborhood that drained
through the Folly system and out through the outfall to the south and across the street on
east side of Folly, both in the Crescent and some of the section of Windermere that was
on that side heavy flooding, and in the outfall
o They have worked through the permitting process; they did an individual permit before
the newer expedited permitting process DHEC (Department of Health and Environmental
Control) had just implemented that quarter ; went through a two-year permitting process
and got permission to do the outfall , which was in construction now ; if you went in this
area you would see the vactor trucks in the marsh cleaning the outfall through the least
environmentally damaging method possible to restore where that channel used to be
before you get accretion and other challenges from the marsh grass growing back ; that
was about a quarter million dollars ’ worth of work for th e outfall cleaning
o They have completed quite a bit of the survey work and stormwater modeling work in this
area; stormwater was trying to prevent the stormwater flow down William Ackerman Road
through a single 24 inch pipe that had some sewerage laid crossings in it so it didn ’t even
have the full 24 inch flow capacity
o The plan was to try go back down William Ackerman, take the 24 inch pipe out and
replace it with two 4 8 inch diameter pipe s and split the basin in half and take the water
from the western half of the basin , route it down the Greenway in the opposite direction
and install a new outfall behind the school back into the marsh ; they were working with
the school district and the school ’s district staff on supporting installation of a box culvert
through the back parcel; working with CWS, who owns the Greenway and have a large
amount of sewer and water infrastruc ture in this area, on how to thread the needle
through their infrastructure and install new box culverts
o This one was moving towards final design so they could move into permitting; this large
project have the support from City Council , who contributed millions of dollars into this
work , Representative Leon Stavrinakis , as well as the sta te towards the project
o In refe rence to o utfall cleaning, they were sitting on William Ackerman cleaning towards
Folly Road in the area of Half Moon Outfitters, then they would continue out the rest of
the way to Folly Road, and turn back around to go on the outfall section; there should be
significant drainage improvements , it won ’t fix flooding but it would allow water to get out
during low tide events
Councilmember Appel thanked Mr. Fountain for his work.
Dupont Wappoo Drainage
o The County and City had been working in collaboration towards this for many years; 1600
acres of drainage basin all trying to flow under I-526 and out through Costco; it was a lot
of water trying to go through a very small and very flat system
o They broke it into 10 project areas ; there was an 11 th area, a private property that was a
school where they came up with some ideas of what they could do for drainage but it
wasn ’t something they intended to run through City government
o The other 10 projects were all planned for implementation – Areas 1, 2 3 and 4 were in
the first round they were working through; the major challenge was the acquisition of
easements in a high value commercial area, a place for redevelopment ; they were
working with a number of property owners trying to figure out a final path forward with
those easements to do the drainage improvements and get this project underway
Area 1- There was a canal and drainage systems along Orleans Road; trying to
improve Taberwood and Hazelwood ; all of the homes in there got flooded by
West Ashley Revitalization Commission
March 8, 2023 Page 7
water not being able to get out through the Orleans corridor ; looking to improve
the section on Orleans and the canals that went down through that property into
the southern section of Citadel Mall
Area 2 was the area around Dupont and Wappoo Roads near Highway 17, in
the area where the former car dealership was located ; they were trying to help
the road drainage of Dupont and Orleans in this area by upsizing pipes and
canals to get that water into that system more efficiently
Area 3 was looking at some work on the back side of Citadel Mall; they have a
concept plan ; they ’ve been in discussion with the Epic Center development team
to open this up into a long linear pond and making it an amenity for the mall
complex with walking trails and other items, while providing stormwater storage
T he mall doesn ’t have much in the way of stormwater ponds, it had two very
small ponds to the north ; this would give a chance for the water that currently
comes off the high property in the mall and pushes everyone else ’s water back
up stream , to be able to flow out and be stored within the property
T here was some real potential here , anytime you have a chance like green
infrastructure open water, you try to look at it as like a development amenity , this
was something the team was very interested in and they were evaluating
w hether that would work on their financial model and would come back to them
Mr. Marolda asked how did the recent change of ownership of the mall affect the timeline of this plan.
Mr. Fountain said the new ownership basically said their intent was to be much faster than the previous
ownership. They wanted to reach out to one of their stakeholders in the ir redevelopment plans for the
property and confirm with that stakeholder what kind of final alignment was and they hoped to get back
with the City within a month or two. He said they were optimistic but if this got delayed they would move
forward with the other projects that don ’t require easements and put this one on hold and get to them
when they could . It would be more efficient to do everything at the same time if they could .
Area 4 was work in the southern portion ; looking at adding some check valves
potentially under I-526, looking at do some improvements in that canal in the
system that tied into that location just to help get that water out more efficiently
o Areas 5 – 10 were projects City had been working through a number of different grants
and earmark request agencies looking for additional funding to move forward with those
projects; you had to build the downstream projects in this space before you could the
upstream project s or else you could cause some flooding issues on the downstream
projects
Mr. Smith noted there were some serious problems to the east of the project area between where
stormwater was work ing and where the Stono Park outflow was. There was nine feet of water in that ditch
every time during a major rain event because it couldn ’t get under Wappoo Road. There had been a
couple of cave-ins in the last couple of years because there are no shoulders on either side. He took
some video during the last rain event and there was four to five inches of water washing over Wappoo
Road after it came out of the nine foot deep ditch and flowed across into a duplex of three or four houses
below him. They had about 15 inches of water in their yard going back over to Overdell Drive . There was
some property off Overdell between Wappoo and Overdell going to Capri Isle where there was a
stormwater maintenance area behind the lots on either side that ’s kind of an interior parcel. That was
where all of the water was going.
Apparently there was some other problems in the storm drain at about that same point. The water was
pressurized to the point where it was blowing out of the manhole up to a foot high. He wasn ’t in the flood
zone as he was about 14 feet but everybody below him was flooding . When that backed up, his property
flooded also. He had to open his garage doors and the back door of the building to allow the backyard to
drain to the storm drain.
He had some conversation with Stormwater about the Stono Park outfall. It looked like it was in good
condition where the end of the pipe was replaced with plastic corrugated pipe fitted over old metal
West Ashley Revitalization Commission
March 8, 2023 Page 8
corrugated pipe. It was clear that that pipe wasn ’t flowing. It was a tough multi-jurisdictional area with a lot
of City and County. All of the infrastructure that goes through Edgewater Park and everyone else goes
down that one side of the road so it was a difficult place to work in. It needed some attention.
He offered to send the video to Mr. Fountain.
Mr. Fountain asked Mr. Smith to send the video. He concluded Mt. Smith was referring to the area on
Geddes Avenue .
Mr. Smith said yes, it was the 300 block of Wappoo Road where it crosses.
Mr. Fountain said they had some recent meetings with the City and County to figure out a multi-
jurisdictional approach for some blockages that were at the end of that system . They have been trying to
incorporate DOT into those conversations as there were many DOT road s that drained into the system .
This was a project area they put on their small project list for consideration. The County was looking at it
as well as to how they work on that area. A lot of the jurisdiction was in the City and a lot of the piping
was in the County. The County was following up with their survey team trying to lay out that first approach
for what the City and County might be able to do in that area. That was in process b ut it hadn ’t gotten to
the actual project definition as they were still trying to figure out what could be done to fix it.
Church Cree k Flood Storage
o They were working in the Shadowmoss neighborhood golf course ; while there were
some storage ponds, there weren ’t a lot of them ; the City adopted customized stormwater
regulations for this basin in 2018; it had to hold all its new water for 72 hours , do rate
reductions, it was a stringent set of regulations but it didn ’t fix today ’s flooding , it just
prevents the worsening of the flooding since a ny properties that got built had to help
improve the flooding as part getting built, even from a greenfield site ; m ost of the
commercial properties being built in this location are located within a TIF within the City
where the money from th at TIF got reallocated into drainage improvements for the basin ;
it was a complex basin and a lot of money went into it
o The city was working through the National Fish and Wildlife Foundation Grant now in
addition to a large amount of acquisition they did most in the 2015-2016 storms with
FEMA grants to acquire properties that were flood prone and purchase d those properties;
they were going back into those properties and retrofitt ing them to hold more stormwater
on a scale that actually does start to make a significant improvement because of the
number of properties they acquired
o First they worked on Mowler Court and Wolk Drive ; they just finished the first sub p ortion
of construction, retrofitting about half an acre of property; they were finalizing design to
go into construction this year on the second portion of that work they connected into the
drainage system; these were also retrofit about an acre in size to h old water and help that
neighborhood, Shadow Wood, drain out more effectively into the canal system where ,
currently, it was choked down by a couple of 8 inch pipes that couldn ’t drain heavy
structural flooding in the late 90s, 2000, and 2008, 2015-2017
o Property to the north of Bridgepoint Townhomes was a larger site of five or six acres
where the city bought out a whole unit of town homes that sat on an island in that
neighborhood that was basically surrounded by the drainage system ; they demolished
the townhomes and will turn it into a 5 acre ecological park with walking trails and
wetland meadows that would hold a lot of storm water in that location
o These were being built like a nature based methodology that was ecological beneficial,
which was one of the main goals of the national Fish and Wildlife Foundation , who
contributed $1 ½ million in to the project work; they also had funding from Nature
Conservancy and a couple other partners on the project
o Crosstowne Church was where the canal comes down to the CSX rail line; Stormwater
has been working with the church and acquiring property in that location to create more
of a distributed wetland area , which would act as a flood plain for their existing channel
West Ashley Revitalization Commission
March 8, 2023 Page 9
that spilled over and flooded those locations rather than flooding all the streets and
people ’s homes than it currently did
o The ecological park at the Bridgepoint location will be five to six acres surrounded by the
canal , they will try to build in floodable meadow s wetland features that have walking trails
for birding, they would probably add some fishing; there will be a small playground , they
were adding parking on the site , they were keeping it at a small scale otherwise it would
creat e a lot of negatives for the surrounding neighborhood and with the grants the re was
very few things they could do in that im pervious area but it should provide a good amount
of stormwater storage during major flood events
o In the smaller area where homes were acquired in the existing flooded smaller lot
neighborhood (Wolk Drive and Mowler Court) ; they will build a little bit of stormwater
storage that would flow through from the property on Mowler Court over to the property
on Wolk Drive , and it will flow north and will connect through an open channel/pipe
system into a major canal
Mr. Fountain added the property bordering Mowler Court was constructed but not vegetated out yet. It is
very early and is kind of a beautification element. The property along Wolk Drive will go under
construction this year. At the same time the Bridgepoint townhome project goes into construction , and the
section in the vicinity of Crosstowne Church should finish design by this year and would likely go into
construction next year.
Chair Shahid noted in reference to that project they were talking about , the $50 million was one of the
estimates .
Mr. Fountain said one of the project ideas to try to reduce flooding in this basin was to build a pump
station to drain out the surface channel. The estimate on getting a pump station that scale was $50
million.
Chair Shahid asked outside of this project w hat would be the ballpark figure.
Mr. Fountain said the work they were looking at now was probably about $5 million for these construction
projects. He noted it was interesting to make estimates right now with the construction market but it was
generally what they would assume if they got solid construction bids.
This wasn ’t necessarily going to completely fix everything . This was the first step towards mitigation. They
would be looking at all the projects in the area but they were trying to come in at less than $50 million for
a pump station that provided no secondary benefits .
b. Stormwater Development Regulations Review
Mr. Fountain said he thought they had this on the agenda as well . T his was talking about their stormwater
development regulations . They touched on some of it but the City made significant changes to its manual .
He wanted to highlight a few requirements of the manual.
Assess impacts of project on the watershed
o Make sure your project assesses its impact s on the entire watershed , not just the where
your project site flood s, but would it cause flooding in any of the properties arou nd you on
the drainage system going out through neighborhood, which has not been the traditional
method for design . A lot of areas with elevation change wasn ’t the same risk factor that it
was in Charleston, where it was flat and water had nowhere to go sometimes.
Require undeveloped properties in basins with flooding to demonstrate no negative impact f rom
development
o There are special protection areas that are basins in stormwater watersheds that have
areas that have problems . If you ’re building on a greenfield site or if you ’re building
something that ’s never been developed, you had to show you ’re not going to worsen
anything by building versus what that green site was doing.
West Ashley Revitalization Commission
March 8, 2023 Page 10
o It wasn ’t completely controlled to the point where you ’re mimicking the green site but
what you ’re often doing is mimicking the green site for about a day until the watershed s
had time to drain out . You were then adding your water in when there is capacity a gain
for drainage.
Require developed properties in basins with flooding to come at least partially into compliance
with current standards
o T he more impactful requirements were in inner West Ashley and in some of the
redeveloping areas West Ashley , requiring developed properties in basins with flooding to
come at least partially into compliance with the current standards.
o When you saw little shopping centers that have no stormwater requirements , t hey were
100% impervious . The way most manuals were written, you didn ’t have to do anything
when you redevelop your parcel because it was all impervious . You can ’t make it worse.
Not matter what you did, it wouldn ’t be any worse therefore you get approval, even if
you ’re site was causing the flooding or your site was part of a basin that had flooding .
o The City didn ’t choose go as far as saying you got to bring your site fully into compliance
as if you were building it from scratch . I n the current manual it said if you were taking a
grass site and fill ing in , that was because they didn ’t want to damage the potential for
redevelopment in West Ashley , downtown or other areas.
o So what they did was made you come at least partial ly into compliance at 20% reduction
on what your site was currently doing in general but you never had to go better than a fair
condition open space , which was what it would have been if it didn ’t have any
development . If you already had stormwater on your site, and you come back and
redevelop, you don ’t have to keep making it better than what would happen on a new
development site on a greenfield in that same basin.
Valuation based redevelopment activity that includes work independent of traditional land
disturbance requirements. Mr. Fountain said they thought they were really clever and had a great
idea . I t was harder than they expected to get this to work . They included a valuation based
redevelopment, a stand-alone ordinance passed by City Council
o It stated if you did more than 50% of the value of your buildings and work such as
remodeling or aesthetic upgrades to your building, you had to come back and increase
your pervious area or do some very minor volume or rate controls compared to the whole
requirements
o The manual said you ’re investing a lot of money, this was an opportunity to do a little bit
for stormwater; they thought the 50% requirement would be really good; land had gotten
so valuable in Charleston that many sites had not triggered this , even when they were
doing really significant amounts of work , because of the value of the underlying land
o So it still does got triggered sometimes but not perhaps as they thought; when a
shopping center came in and did a lot of the remodeling you ’d see this get triggered and
start to bring those in, that h asn ’t happened to the extent they expected based on the
real estate appraisals over the last few years
o But i t did still have some benefits and you still s aw it when you got very high value
properties and a lot of building on them that they redevelop , it still does matter , it just
wasn ’t quite the extent they originally envisioned
Chair Shahid noted this was a list of just those West Ashley projects. It wasn ’t a comprehensive list of
what was being done throughout the city in other areas. These projects didn ’t happen overnight. These
projects took place over several years. A lot of work went into identifying these areas and pushing to
getting the funding for these areas.
Mr. Fountain worked to get the funding for these projects but it was a collaborative effort with
Councilmember Waring, the chair of the Public Works and Utilities Standing Committee, and other
members of City Council. There were also other projects Mr. Fountain didn ’t mention that were still on the
West Ashley Revitalization Commission
March 8, 2023 Page 11
drawing board. Some were very high dollar projects. All of these projects had a tremendous impact on the
homeowners.
The new flood manual was passed in 20 1 8 . The city ’s stormwater standards is some of the stri ctest in
South Carolina, probably maybe in the southeast. The city was going back with a lot of things that weren ’t
done right. These were remedial efforts to improve the neighborhoods. They ‘ve heard stories how this
impacts also raw sewage. The City hasn ’t address all of these issues but they were on top of it. He
wanted the Commission members to be aware of what they were doing along those line s , and the public
be to aware this was a painstaking and deliberate effort on everyone to get to the point where they were
with this with a lot more work to be done in West Ashley .
Mrs. Sutton asked how were the projects prioritized. How would the residents know if their areas of the
City were on the backlog of the project list.
Mr. Fountain said many of the project s were what he referred to as almost “legacy projects ”. The se were
phases or projects that had been in design . In reference to capital projects , one was looking at a 5 to 10
year time frame. They ’ve been funded and making progression.
A couple of years ago the city worked to implement a quadruple bottom line priority filing system that
looked at :
what was the traditional economic cost put into a project,
the environmental cost benefit of the project,
the social justice cost put into a project and
what was the operation/maintenance impact for a project
It doesn ’t try to create a hard and fast quantitative score necessarily , though it does. What i t tried to show
was whether you ’re bettering or worsening a subset of areas within those projects. That gave you a sense
of how many projects did you want in this system of the city ’s values from a stormwater perspective. The
step was as you ’re allocating future funding , how do you look at the valuation and assign that funding.
The Ad Hoc Budget Committee made recommendations to City Council and Council made th e
determinations based on that information of where to allocate money as it comes in . One of the things
where the City have been incredibly successful was grant acquisitions . Grants also drove some of the
prioritizations. If they could bring in more than 50% of the value of a project , it improved the benefit to the
City ‘s cost ratio.
They had a series of projects they ’re working on now where they had either state infrastructure bank
funding, National Fish and Wildlife, or H ousing and U rban D evelopment C ommunity Development B lock
G rant (HUD CDBG) , which were components in the valuations. That was going to be one of the big topics
as they start to complete many of the legacy projects and start allocating the next generation of funding in
the next five years out , h ow were they pri oritizing and how were they valuing .
It was part of the reason why the Public Works and Utilities Committee created the million dollar small
project allocation. Instead of speculating and hoping your project receives funding and gets into the large
projects , what could they do in the short run was to not only give more relief with a separate pot of
money that wasn ’t competing against new mega projects in certain areas , b ut also th at money informs
what needed to be done in the larger project .
One of the challenges he had in engineering was someone would ask what would it cost to fix flooding
and how long would it take . As an engineer , h e would say he needed a couple of years and hundreds of
thousands of dollars to figure out what it would take to do it . Y ou had to allocate money into the projects
to figure out whether you should allocate more money. Then you had some costs and then you would run
into the challenge of legacy projects or d id you want to keep funding that project just because you started
it.
This was where they backed out of that and how it started small project allocations – a look at how
projects would work doing some short term, high value, low cost improvements and start building a
“pipeline ” for building out for future pro jects. You were constantly moving from the design of one project
West Ashley Revitalization Commission
March 8, 2023 Page 12
and the d esign of the next project . As that first design moved in to construction , the next design project
came up for construction . As that went in to construction, the next project c ame into construction.
This was the capital p lan they were putting together . It will come to light over the next couple of years as
they made those long-range financial decisions.
Mr. DeStephano noted to Mr. Fountain if you was coming across from East Oak Forest , which was
primarily the City, and coming across Savannah Highway, which was primarily County/ PSD, do they say
they ’re going to stop that ditch right there and let the County and DOT take care of it.
To Mr. Smith ’s point, Mr. DeStephano noted he lived near him and personally saw the flooding he spoke
about earlier. But was it a truly holistic view of in reference to the watershed where they knew they had to
transverse a swath of County property. Was it yes, they will do it and focus on it, or they would rather
work in Windemere because they knew it was all in the City.
Mr. Fountain said much of West Ashley was still somewhat a patchwork annexation. It was very important
to make sure they were talking to each other , the County, City and James Island . Stormwater was
probably the area where they ‘ve been the most successful in aligning their interests and collaborati ng on
project work . There was always a challenge with funding. Not everyone had as much money as everyone
else in different areas, project areas or Council areas. But they had been incredibly good about getting
together for brainstorming ideas, figuring out what they could fund and what other people might contribute
in-kind services or survey work, then coming up with a project approach to implement those projects.
He concurred with Mr. DeStephano that just cleaning half a ditch would make it worse . It was just as bad
saying since a basin had two entities, you weren ’t going to work on it because you knew it would be
difficult to get those two entities to speak to each other. He thought the County and City had a large
handle on at least five or six current projects where they were working together, co-funding, doing
collaborative work.
He said they tried to use Stormwater as a good example of something they needed to continue doing as
enti ties in all of their areas because it all tied together . N ot h ing they d id was really stand-alone from one
entity to another.
SCDOT was going to do their own thing in the cities . S ome of the challenges they had was as you get
into drainage , water didn ’t care about jurisdictional boundaries as it tried to move through the system.
They often did create some flooding challenges and trying to challenge everything else from not having
that level of communication. He was a former county employee before he came to the City, which he
thought might had been a “back doorway ” into creating some of that approach. But it was something they
were really doing a good job with.
Senator Sandy Senn and some of the other members of the legislative delegation have created their own
flood ing task force to try to help bring SCDOT into the fold and connect some of those that was more of
the maintenance side than the capital project side but that had some value . They had a number of
permissions where they try to look at areas or town s and try to get stakeholders.
It wasn ’t just for Stormwater, the City, County, SCDOT and the Town of James Island. It was also how to
get Charleston Water Systems (CWS) and other utility companies engaged. They worked with ATT to
relocate an enormous duct bank they had running down Playground Road, which was about a year ago
where there was soft close of Playground Road, so Stormwater could do drainage work . It cost ATT over
$1millio n. They also worked with St. Andrews Parks and Playgrounds on drainage acquisitions through
their property to improve drainage canals.
West Ashley Historic Preservation Discussion – Eric Pohlman
This was requested by several Commission members and had been coming up more and more rec ently
in West Ashley. T he City had four plans that addressed historic preservation in West Ashley and the need
for it:
T
Preservation Plan (2008) – The plan was done for the entire City , this section pertains to
recommendations for West Ashley :
West Ashley Revitalization Commission
March 8, 2023 Page 13
o Creating area character appraisals designating Wappoo Heights, Crescent, Windemere,
South Windemere, Byrnes Down, Moreland, Avondale, Maryville , Ashleyville as
Conservation Districts
o Extending the BAR oversight across the river for new construction, alterations,
demolitions to the portion of the Ashley River Natio nal Register Historic District within the
City of Charleston
o Publishing a Preservation Manual for Charleston that details types of buildings and
materials, as well as how to conserve and adapt buildings for modern u se
o Protect historic commercial areas like Avondale commercial district through zoning
methods
Three Area Character Appraisals – Two were for the West Ashley area; the reports within those
recommended:
o The creation of Conservation Districts
o Expanding code enforcement for property maintenance , Mr. Pohlman noted Livability
came out for any city annexed property in West Ashley
o Create demolition review for the old Windermere neighborhood
o Submit the Coburg Dairy Cow for National Register of Historic Places (NRHP)
o Pursue NRHP for Old Windemere Neighborhood
2017 Plan West Ashley – There were two implementation items in reference to historic
preservation:
o Element 6 – Pursue preservation for the neighborhoods
o Element 7 6 – Identify and preserve historic community assets and character in West
Ashley
2021 City Comprehensive Plan
o There were some areas in the City in general, but also in West Ashley that had been
overlooked for typical historic preservation – the African-American settlement
communities
The current only off peninsula preservation tool was if a structure was located on the commercial
Design Review Board (DRB) corridor and it was older than 50 years, it needed approval to be
demolished
What the board weighed for whether it should or shouldn ’t be demolished was :
o the architectural and aesthetic features of the structure,
o nature and quality of the structure,
o architectural fabric,
o any historical significance,
o the nature and quality of the surrounding area and
o the structure ’s contribution to the overall streetscape of the area
this was for any request of any demolition, partial demotion, removal or relocation
There was a caveat – the Board could require a licensed structural engineer if the reason for
demolition was it was falling down
The following were some recent demolition requests and what happened to them in terms of preservation:
West Ashley Revitalization Commission
March 8, 2023 Page 14
1332 Ashley River Road – Deferred by the DRB for demolition; the home was hidden was behind
a “forest ” that grew up around it; due to the work of community members , including some
Commission member s, it was discovered to be the home of Isaac Peaks, who was responsible
for the location of Highway 61 and the development of many of the now historic neighborhoods in
West Ashley
1349 Ashley River Road – Across the street and not too far from 1332 Ashley River Road, it was
a home that had been turned into a commercial operation; DRB denied demolition; it was still in
the County but was in the annexation pipeline at the time, that meant they could have pulled the
demolition permit and request annexation afterward
2319 S avannah Highway – F ormer dry goods/grocery store near Savage Road ; DRB approved
demolition ; the community presented the history of the family and the importance of the structure;
it was the only grocery story in the area for many years
1731 Savannah Highway – Former residence turned commercial; DRB denied the demotion
based on the uniqueness of the structure
8 Stocker Drive – Outside of DRB ’s jurisdiction; located in the Old Windemere neighborhood;
demo lition was requested but through community involvement the applicant pulled the demolition
permit; they secured support from the neighborhood for variances to get a second home built
adjacent to 8 Stocker
Dupont Station- Former Limehouse Produce Shed, was demolished by the County 2016, no
historic preservation oversight
534 Savannah Highway – Has been before DRB twice, was denied twice; structure is currently
vacant and probably at risk for structural issues
948 St. Andrews Boulevard – Stier Kent Canady me tal fabrication site; demolished in the County
in 2021
Some Current City Efforts:
Spurred on by the 8 Socker Drive request – T he neighborhood requested a meeting with City
Council members – Shahid and Appel, different neighborhood presidents in the area, City staff ,
concerned community residents about the effect of structure demolition on the neighborhood; the
Old Windemere neighborhood association moved forward with a survey they were giving out to
the residents in that area to determine if historic protections were desired with in the comm u nity
and what those protections would like:
o demolition protection
o additional architectural review over new construction
o landscaping
o urban form
Referring to a map from the County Assessor ’s office, Mr. Pohlman noted that the large number
of properties colored red were built in 1973 or earlier meant it was 50 years or older ; th at was
actually the threshold for the National Historic Preservation through the interior (structures 50
years or older) ; he noted as they moved forward they needed to make sure they acknowledge
this was a unique scenario in West Ashley and the suburbs
Comparative Cities – They have begun looking at two comparative cities in terms of how to
address suburban and mid-century preservation:
o Colu mbia, SC
Community Character areas – It looked at different neighborhoods and how to
manipulate the ordinance to meet the needs of th ose different areas; their
ordinance included subdivision and lot combination review to architecture to
West Ashley Revitalization Commission
March 8, 2023 Page 15
demolition review , and depending upon which neighborhood it was , which
section would apply for that one
o Savannah, GA
Conservation Overlay District – These were out in the mostly 1920s to 1960s
suburbs of Savannah and those just looked at demolition review ; they weighed
the contributing status of the structure if it was integral to the neighborhood
character or to the historic nature of the area
Mr. Pohlman concluded saying currently the majority of West Ashley doesn ’t have any historic
designation or oversight for demolition. Many properties were found to contain historic or cultural
relevance only when demolition requests were presented to the City. M embers of the public were asking
for greater clarity and direction regarding what could and should be preserved. He noted they all
acknowledged that not everything had to be preserved but they needed to know what was out there and
what should be.
Generally m id-century and suburban preservation was a new pathway for historic properties. It took a
diffe rent look than traditional preservation techniques. Some of the questions were:
Does West Ashley need a full architectural inventory of historic stru ctures
Should demolition review extend beyond current considerations?
Should an interim measure of better demolition guidance be drafted ?
Chair Shahid said in order to fit in the DRB purview, not all of West Ashley fit into the jurisdiction of the
DRB. Only particular orders fit into that area and it had to meet the 50 year time period. Charleston was
the birthplace of South Carolina . There was a lot of unrevealed history in West Ashley.
Mr. Smith noted that Charlestonians had been somewhat conditioned to view historic preservation as an
issue that was just an historic district downtown. Consequently, there was over 90% of the land area in
the City of Charleston that had zero protection for buildings that were 50 years or older.
West Ashley, being th e first suburb of the City and the closest one to the peninsula area, had a lot of early
to mid-20 th Century buildings in neighborhoods that have reached the age that they were worthy of
protection and should be protected. The problem was every day we seem to be losing more and more the
buildings and character of these neighborhoods because of unregulated demolitions and demo lition by
neglect , like one of the buildings on the same block, 576 Savannah Highway , which was covered under
the Bridge District jurisdiction. There was a demolition permit issued for that in 2003 and they discovered
it was being demolished that weekend. They got it stopped. It sat for 17 years empty with the owner next
door, who refused to do anything with it because they didn ’t want to preserve it. They wanted something
else.
Demolition by neglect has become a problem. Maryville/ Ashleyville had a serious problem with several
heirs ’ property. They were too small for the Center for Heirs Property to help because they dealt with
issues with 10 acres or more. They don ’t have that specialized assistance to help with the heir ’s property
situation of these properties . Consequently no heir would touch the property to maintain it, keep a roof on
it. As soon as you get roof leak, within a year or two you get serious structural issues and we end up
losing the fabric of another neighborhood.
Mr. Smith said they had been trying for 25 years to protect the character of our historic neighborhoods
and buildings without regulating demolition but that was like trying to fill a bathtub without plugging the
drain. They were at the point now where they needed to plug the drain. They have talked a lot about
things that they have discussed in the past that need ed to be done that haven ’t been done . They have
discussed and practically promised they would have protections for our older historic buildings and it
helped to protect the character of the older neighborhoods as we go through redevelopment in West
Ashley. It still hasn ’t occurred. They were still being promised.
T he work being done in Old Windermere right now was helpful but the underlying problem for all of the
City of Charleston off the peninsula was there was no regulation of demolition . In the time it took to get
West Ashley Revitalization Commission
March 8, 2023 Page 16
those ordinances passed that had been promised time and again , we were going to wind up losing a lot of
the fabric of this community.
It ’s time they put a stop to this . H e asked the Commission to recommend to City Council tonight that they
passed a resolution to night or just agree to recommend to City Council a temporary citywide moratorium
on the demolition of buildings 50 years old or older until those ordinances and protections they ’ve been
promised were in place.
Mr. Smith concluded saying they ’ve heard all through the Plan West Ashley process that they wanted
their neighborhood character to be protected. That required the stopping of the demolition of the fabric of
the neighborhood. He asked that that be done tonight and wanted to place that in the form of a motion.
Ms. Hamilton seconded the motion.
Chair Shahid asked Mr. Smith to rephrase the motion.
Mr. Smith moved that the West Ashley Revitalization Commission strongly recommend to Council that a
temporary citywide moratorium on the demolition of buildings 50 years old or older in the City be adopted
and stay in place until such time as the ordinances they have been promised were coming get here , this
include d the rewriting of the Zoning Ordinance that might take years before they saw the final product ,
and it might or might not protect. But if they don ’t plug that drain, there won ’t be anything to protect.
Ms. Hamilton said they agree they have identified a number of structures in her neighborhood that were
structurally unsound and needed to be demolished. She didn ’t know if the family was allowing it to
be come demolished by neglect . She knew heirs property was a major factor and how they solve that
issue was at the core of it. When you place that red X on a building noting that it ’s structurally unsound
and dangerous, how long must it stay there before some action was required and what options w ere left
for the property owner at that point in time?
Mr. Pohlman said the red x was to alert first responders that it was a hazardous situation . It was there
until the hazard was no longer there.
Mr. Smith said they had seen press recently on this revival of a committee with livability that they seem to
think they might be able assist people with the heir ’s property issue. He asked if there was any one on the
Commission who was familiar with it and how it might be helpful here. It seemed to be a City
Commi ssion .
Mr. Pohlman said he knew what Mr. Smith was referring to but he didn ’t know the ins and outs of it as he
just read about it in the Post and Courier . It was some type of committee to help navigate. He believed
they track down the owners of the heirs property and provided them with a route to where to go and
secure grants. They weren ’t providing direct funds themselves. They were providing technical experience
and help to those owners.
In reference to Mr. Smith ’s motion, Mr. Marolda said West Ashley had three periods of significance:
Colonial Era / Antebellum Era – Drayton Hall and those large touris m sites mentioned earlier
Post Bellum Era – The period after the Civil War; this was the era where the settlement
communities would fall into
Subdivision Era
When a purchaser bought some of these properties, particularly the older ones such as the Goble house ,
which wasn ’t purchased but was up for sale on Magnolia Road , and 1332 Ashley River Road , they
purchase d it knowing it had historic value. It wasn ’t every house that was over 50 years old that have this
type of value. There was one they discussed on Orleans and Dupont Road s at a prior meeting. There
was no documented significance historic to that structure. Some of the others that were more prominent,
if a developer purchases they ’re doing something knowing that had value to the community.
There has been discussion at DRB about placing an undue financial burden on a property owner of
having historic protections. He would agree with that in some scenarios where the average person
buying a home for themselves doesn ’t want to be burdened with historic protections. But that was
understandable for a $200,000 or $300,000 house. But the larger homes, which had a sense of
West Ashley Revitalization Commission
March 8, 2023 Page 17
significance that made them eligible for tax credits , should be treated as assets that was not just the
owners but they had sense of belonging to the community itself.
Mr. M arolda said they needed to consider historic landscapes. When he documented the Avondale
Character Appraisal two years ago, he documented how Oakdale was the original plantation driveway . It
talked about the plantation district ( Magnolia, Drayton Hall) and those had antebellum. Oakdale
significance was twofold – it had significance of the subdivision era, being enjoyed now , but it also had
significance for a prior era. So when looked at as a landscape not of just a road , the canopy of oaks was
the driveway and were placed there specifically for a reason. So if you looked at the development in
Ashleyville where the King house was, that has been now converted to a walkway, a canopy similar to
Oakdale. So when residents on Oakdale have a grand live oak tree in their front yard, they don ’t have just
a tree, they had a piece of a historic landscape . He thought that needed to be recognized as well as part
of a preservation plan.
Mr. Smith said they found things in West Ashley that would surprise you frequently . He noted he, Diane
Hamilton, Donna Jacobs, Ina B ootle, Mr. Marolda and Grant Mishoe worked together all the time. There
was a very early 19 th Century or late 18 th Century log home that was so wrapped up in 1950s additions,
you would never know it was there. The brick foundations of the central fireplace chimney complex of the
chimney itself was taken out but the foundation was still there. On the tax rolls it stated the house was
built in the 1950 s. If the man pulled a demolition permit today, it could go tomorrow.
They recently found a cemetery that could date back to the Proprietary Period that they got plats that
showed it in 1788 and 1826, and it went off the plats after that and was not mentioned again. It was all
City property and they were working with the City . They were meeting with Jason Kronsberg, director of
the City ’s Parks Department, to do GPR on it to figure out where the boundaries were.
He said they needed a process that allowed them to say, “Hold on a minute ”. They felt there was some
significance there and they needed time to find that. If it was truly significant, then the demolition
prohibition should stick. These places don ’t get their day in a public hearing and it was time for that to
change.
Mr. de Stephano said he was a little troubled by this. His home was over 50 years but it was in the P SD
so he could tear it down. His problem was they were talking about revitalization and also preservation.
They spent $4 or $5 hundred thousand on a study four years. They were working towards it but it wasn ’t
touch ed on. There was a section on the historic al fabric and character of West Ashley. He felt if they put
yet another road block in front o f the revitalization part of what they were trying to do , they were just going
to continue to delay. The Chuckie Cheese shopping was probably built around 1973. We can ’t tear that
down? He said he would love to see that go.
Mr. Smith said they couldn ’t save everything . But if it was older than 50 years they need to be able to look
at it before it gets torn down. But by statute West Ashley Revitalization Commission served as the
steering committee for the implementation of Plan West Ashley. Plan West Ashley requires the
Commission to specifically to identify and preserve historic community assets and character in West
Ashle y .
Mr. deStephano said that should be counted. But he didn ’t think they needed a blanket ordinance that
said, “Whoa, we ’re going to stop. ”
Mr. Smith said if they could ge t some other kind of ordinance they wouldn ’t have to. They tried that for 25
years and it didn ’t work. There was always some reason not to do what obviously needed to be done.
They wind up having these fire drills and wars on Facebook. The only tool in the box they got for
preservation in West Ashley was if they got a group of people that are worried about protecting something
of significance, they needed to get really big, really loud, really fast or it ’s gone.
They had been doing this for 25 years and it was exhausting for everyone who was involved. They have
saved a lot of really important things in the community and have raised the awareness in general of the
importance of protecting the early 20 th and mid-20 th Century stuff that was worth protecting. It wasn ’t just
downtown that was entitled to this. Our communities are a value to us and we love our communities, too.
These older communities deserved protection now and they needed to expand this. And if they weren ’t
West Ashley Revitalization Commission
March 8, 2023 Page 18
going to get the ordinances they ‘ve been promised for 25 years, then they needed to just stop the
demolition until they got around to it.
Councilman Moody said there were nuggets all over West Ashley but the unintended in the
consequences of the weaponization of this was just not something he couldn ’t support. Moratoriums were
“Help me, I don ’t have any more ideas. Just stop everything. ”
He noted Mr. DeStephano ’s reference to Chuckie Cheese. That building was built in 1981 and in 8 years
it will be historic. The damage to people ’s property rights had to weigh in on this thing. A blanket
moratorium was unacceptable and he couldn ’t support it.
Mr. Ferira said while he supported wholeheartedly the intent of Mr. Smith ’s motion, he thought of things
two different other ways. He thought he wanted to have a practical viability once it got to Council where
you ’re recommending to go. He also wanted to think of the effect it has holistically on the message they
were putting out there because they branded revitalization . He thought the word “moratorium ” had a
chilling effect and let people know may be they were closed for business or closed for ideas.
He a greed that they were the steering committee. He wasn ’t trying to amend Mr. Smith ’s motion, he
wanted to make two suggestions. They were a steering committee, not a legislative committee. The word
“moratorium ” said “W e ’re done ”. The number “50 years ” was very specific. He suggested sending
something to Council to ask them to define a date and define a clear process because he thought all that
anyone wanted , with in regard s to property rights or preservation , was a clear, predictable process.
He thought “50 years ” was a little arbitrary. It made sense when it was picked but now they were rolling
into a timeline where you look back 50 years . There was stuff that was sort of cleaner and he thought
they could all agree on that , but he understood where they were going with it.
He did think before something went to Council, the word “moratorium ” was a scary thing. . It was basically
saying you had a binary thing you have to represent and he thought it was dead on arrival to as k 12
people to remotely enact a moratorium because it sounded economically unviable and a little anti-
capital ist . He wanted stuff to be preserved in a methodical but a defined way . If you guided them to
clearly define it, he was on board.
Mr. Smith said he would be open to amending the motion but he wanted to make clear that there were
many people who were there tonight because most of the area s they wanted to protect are
neighborhoods that weren ’t areas where they were talking about doing major redevelopment. What they
were to have to figure out with Plan West Ashley was how to thread that needle on the edge of this
between what they definitely wanted to for redevelopment, on where they definitely needed the density .
He had already agreed that that ’s what they were going to do.
But it was the border that became the problem . He said probably 95% of what they were worried about
was out of DRB review . Most of what the redevelopment portion of West Ashley was going to consist of
was within DRB review and they already had the ability to do that there. He was comfortable with that.
But when you turn off the major corridors there was no protection at all within the neighborhoods and
there were really some bad things that were happening out there. They were promised and promised that
they were going to have some kind of protection and it never happe ns . It started with Cavallaro Club in
1998 and this conversation has been go ing on since then and it was always the same result. They heard
this was the first step but they ’ve been on this first step for 25 years.
He didn ’t disagree with the redevelopment aspect of it . If there was a way to thread that needle to find a
good border, he was comfortable with DRB review ing those areas that were big redevelopment.
Mr. Ferira said he was trying to take away the scary word. He thoug ht that on c e it goes to Council , it
actually matter ed, makes it not dead on arrival on ceremony. As an example, h e was on the steering
committee with regards to archeology efforts three years ago. He thought they were often extremely well
intentioned efforts. It started out very holistically . But when they start so holistically without being targeted ,
sometimes they scare off participation. He thought the archeology effort trying to make the overlay so
much of West Ashley instead of really specific targeted pockets that there was such consensus around ,
made it a little scary for there to be holis tic consensus and they ended up with no progress.
West Ashley Revitalization Commission
March 8, 2023 Page 19
He wanted some progress based on what Mr. Smith was saying. He felt they had to start off with bite-
size, definable, truly defendable ways to do so. He felt it was their job to steer priority, not define the
cutoff date and not define a very binary, polarizing word for other people to have to vote on . It was scary
as hell that they ’re not going to vote on it.
Mr. Smith asked how would they do that tonight?
Chair Shahid said he agreed with Mr. Smith. I t had been an exhausting fight. They were successful in
preventing the demolition of two very valuable pieces of property. If they continue d to fight this battle, they
were going to lose a lot of these valuable properties. They haven ’t really touched upon
Maryville/Ashleyville , one of the most historic sites in the state of South Carolina.
It came down to preparing an ordinance, sending it to the Planning Commission to get a bite out of it first
and coming back to City Council on second or third reading. But they had to define this to address
specifically what they were trying to do. One of the main issues was going to be do they expand the
DRB ’s jurisdiction or not. Whether or not these properties fitted into this order, It wasn ’t going to impact
anything outside of the City ’s jurisdiction. The age issue would be the other criteria they were going to
have to wrestle with.
He wanted his colleagues on Council to work with him on this. They have six members of Council who
represented portions of West Ashley . If they couldn ’t find a seventh person to help them to do this, that
was their failing on having this accomplished.
He thought the motion was City Council get off your rear end, get an ordinance passed, get it to the
Planning Commission so they could wrestle with and let them fine tune this to make sure they were
getting the exact intent of what they want to accomplish.
Mr. Smith said he was willing to amend his motion or withdraw it. He didn ’t want to go home and have it
pushed it off again, then they have another fire drill and everyone gets upset again .
Councilmember W aring said he won ’t be one of the seven to vote for the moratorium because it kills West
Ashley Revitalization. He thought Mr. Marolda ’s approach was very methodical that made sense going
from the historical perspective. We need to get an inventory. That would make a whole lot of sense . T o
say that nothing was done, emotionally that sounded good , but he remembered when we didn ’t have a
DRB for West Ashley. We do have a DRB for West Ashley. There had been properties that c a me before it
and were preserved. There have been properties that came to before it and even the DRB said it needed
to be torn down.
A blanket moratorium that would last years and years, he didn ’t know if that was legal. He thought the
approach Mrs. Jacobs and her team did in the Ashley River District was warranted for f u rtherance on
West Ashley taking an inventory approach. He told Mr. Marolda he liked what he said, it had a rhyme or
reason to it. If there was an ordinance that was out there 25 years ago, he wanted to see and read it . If
they were promised an ordinance for West Ashley that was written and didn ’t pass , he wanted to see it to
see whether it had any applications today. H e agreed with Mr. Ferira that a moratorium would be one of
the worst things they could d o just when the private sector was beginning to spend and with a full style
hotel coming . He thought it would be the wrong approach.
Mr. Smith asked if that meant he was comfortable with cont inuing with the fire drill?
Councilman Waring said he was but he liked Mr. Marolda ’s approach and the idea of taking an inventory
of historic properties. But he noted Mr. Smith was correct that there were some nice and unique
structures that most of West Ashley might not know about. He thought they needed to find out where they
were, target them and take that approach rather than casting a broad net. When the City used a
moratorium, it was usually three or six months. He thought they had one that lasted upon renewal 12
months. But he wasn ’t familiar with a moratorium that lasted for years.
Mr. Smith said the only way it would last for years and years was if the City continue d to not provide them
with the ordinances that would give them the permanent protection they ’ve been asking for for 25 years.
Councilman Moody said the answer for that was the ballot box and not blanket liens on everyone ’s
property.
West Ashley Revitalization Commission
March 8, 2023 Page 20
Mr. Ferira thought the word was polarizing and would end up being symbolic. He wanted Mr. Smith to
rephrase him motion. He wanted it to be Mr. Smith ’s and he loved the momentum. He wanted to vote for
it. He just wanted to point out the reasons why he didn ’t want it to be vote d down 12-0. First, he thought
moratorium was chilling . W ith regards to legal background, a temporary moratorium would make sense
because there were reasons and rights for that to occur. He thought moratorium was a scary word for
Council to vote on.
Second, in South Carolina, under Article 1, Section 13, State Constitution, there can ’t be a taking of
property rights without compensation. Mount Pleasant got sued for an open ended moratorium. When
one spoke about downzoning, downzoning wasn ’t taking the land, it was taking the rights and
entitlements to it. They could get sued for that.
He thought it was wonderful to say what they were fighting for and what they wanted. But when they
armed 12 people with the polarizing word that they couldn ’t stand behind and some thing that they might
get sued fo r, he didn ’t think they would end up where they wanted to go . He wanted to end up where they
wanted to go. He just wanted to arm them with the talking points to pass something that got them there.
Mr. Smith asked how do they give the DRB jurisdiction over any building 50 years or older in the City
temporarily until the ordinances that were supposed to be being drafted at this point , a new zoning
ordinance , until they get some permanent protection. He was comfortable with DRB just having some
kind of public review process for all buildings 50 years or older in the City until such time they had
permanent protection.
He said he could drop the word moratorium but he wanted to use it tonight because it was time for City
Council to wake up and do something. That was what he intended with the use of the word. He was glad
people woke up and didn ’t like the word. He didn ’t particularly like it either but he didn ’t like what was
going on. He was comfortable with DRB having jurisdiction over anything proposed for demolition 50
years or older citywide. He felt it needed to be citywide so it was bulletproof in terms of the law.
Mr. Ferira said he wasn ’t against Mr. Smith, he was trying to run PR with him. Moratorium was Latin for
death. Revitalization was Latin for life like . He didn ’t want to use underlying roots that scare people to not
get it where you wanted it. He would direct them to prioritize an oversight committee and an entity that
reviewed buildings of significance and categorized and catalogu ed a defined process for that in West
Ashley so it received the same prioritization of preservation and of championing of buildings and history
that downtown had received for so many decades already.
Chair Shahid said whatever they did there tonight was just a recommendation. Nothing was going to
happen even if they used the word moratorium. It couldn ’t happen. Whatever message was sent to City
Council move on the take and they were going to start that process to prepare the right ordinance. It was
going to require a lot of public hearings and vetting. It wasn ’t going to get done overnight. To get the
message officially to Council, he thought the wording Mr. Ferira and Mr. Marolda used was what was
needed. If Mr. Smith was open to amending his motion, that would send a message to Council.
Mr. Smith withdrew his motion in favor of something clearer . H e suggested someone else to make the
motion.
Mr. Marolda moved to ask Council to consider reviewing procedures within the existing boards that we
have to expand protections and creating an inventory or creating a sub committee or subgroup within this
Commission to quantify exactly what should be preserved and what we want to preserve.
Mr. Smith said he was fine with the motion and seconded the motion.
Councilmember Waring asked Mr. Marolda if he could include the periods of time he referred to as part of
the motion.
Mr. Marolda said yes, he wanted to include Antebellum, post Bellum and subdivision eras consideration.
Ms. Hamilton said she was hearing the mentioning of DRB. When you look at the rules or regulations
which had applied to the peninsula, they had to be careful how they applied those same rules and
regulations for the areas off the peninsula. She was thinking about resources property owners might or
might not have in order to meet the criteria. They could actually inadvertently cause some individuals to
lose their property because they couldn ’t meet the criteria. In her neighborhood, they looked at the
West Ashley Revitalization Commission
March 8, 2023 Page 21
National Registry and did a little research but that was always a concern – how was that going to impact
those individuals who didn ’t live on the peninsula.
Mr. Smith asked if it would be appropriate for him to include language that it gave consideration to
economic impact. Ms. Hamilton said they were going to be studying it so that should come out with the
review and they could evaluate it as part of the review.
Mr. Marolda agreed to make that part of his motion.
Mr. Smith noted Councilmember Appel indicated there was no one size fit all for everybody ’s
neighborhood. Every neighborhood was different but there were a couple of underlying lowest common
denominators here and demolition was the number one. They had to be aware of the economic impact to
people. He seconded the addition s to the motion.
The motion passed 10 to 2 (Councilman Moody and Mr. deStephano).
Public Comment Period
Chair Shahid said t here was a 30 minute comment period. Comments were restricted to one minute per
person.
Anna Catherine-Carroll, Preservation Society of Charleston :
They support community values for preserving and celebrating spaces that made West Ashley ’s
neighborhoods unique; they have long advocated for preservation strategies specifically tailored
to West Ashley
The most recent city plan recommended enhanced protections for historic buildings and
neighborhood character in West Ashley and provided a strong starting place for developing a
resident driven framework for implementation
They previously offered a range of ideas to provide community members the tools they needed to
stand up for places that matter most to them and a few that fit really well within the intentions that
had been specifically stated by the Commission members
o A measure that could be undertaken immediately which would be something along the
lines of a more comprehensive survey efforts, which had already been mentioned
o Enacting a type of demolition delay ordinance that would provide a period of time to work
with property owners to explore preservation option s before a historic buildings was lost;
they have sent examples to City staff before and they would be happy to continue to pass
those along
Jordan Cooper, Historic Charleston Foundation
They supported the Commission in endorsing a city-wide demolition delay of buildings 50 years
or older in West Ashley
The loss of historic structures was a concern to the Foundation not only on the peninsula but
beyond West Ashley specifically
A pause in demolition activity was a welcomed one and they supported West Ashley and its
residents in the exploration and implementation of preservation options , they believed this delay
would benefit the community and its character
Ron Sassard, president of Old Windemere Neighborhood Association
They were currently doing a survey to see who was interested in implementing any kind of
character preser vation protections
The survey asked questions regarding what people were concerned about ; the survey itself did n ’t
accomplish the implementation of the protections; once the survey was completed, they would
see if there were enough people interested in moving forward , they would then move forward with
a definition phas e working with the City and preservation to see what other cities had done and
discuss what would be appropriate for Old Windemere
West Ashley Revitalization Commission
March 8, 2023 Page 22
Jackie Morphosis
She was “fed ” by Mr. Ferira statements and his efforts to build bridges, compromise and find a
new way to use language t hey a ll could receive and not be put off by ; she understood what he
meant about revitalization and moratorium ( “Moratorium was Latin for death. Revitalization was
Latin for life like ”)
Mr. Smith spoke to the big picture and touched her heart – the need to preserve beauty,
architectural, history and culture; it was more than just a single building
She wanted to thank Chair Shahid for everything he did; the Commission members were all
appreciated no matter what their viewpoint was , they were all here because their intention was to
make West Ashley a better place for everyone
Dr. Roger du F au , Parkshore Estates
He questioned why 50 years was the cutoff; if 90% of West Ashley was built close to 50 years,
history should be prior to them , not at that time; perhaps a compromise could be to increase the
cutoff date earlier so that it affects fewer of the people that were going to be impacted right now
Ash ton Finley, South Windemere
She was working closely with Old Windemere to try to protect that neighborhood; it was a
wonderful collection of historic homes that represented an important time period
She thought what Mr. Smith was trying get moving with the city was a process for neighbors w ho
were concerned and wanted to preserve their neighborhood; there was no process in place, no
pipeline ; the County has an application if you wanted to become an historic district in the County
A neighborhood in Savannah, Chatham Crescent, had a similar fight th at they did with Aid
Stalker; five months they went from demolition, which they were able to avoid, to being given a
conservation district
We can have that in the City of Charleston where there was an actual pipeline to process
applications and she felt that was what the neighbors were asking for
Donna Jacobs
She thought what they they ’ve never had was a good conversation about what historic
preservation meant for a suburban area ; she was encouraged that the city had already looked at
it because when you thought about it on the peninsula it meant something different
She noted there was success story in West Ash ley, it won a Car olo polis award when they were
going to tear down the whole Albemarle School; Moreland Manor, which had an extensive history
that was denied demotion and was renovated by Crescent Homes on Savannah Highw ay
But we ’ve lost the Charleston County Market , which was a big history loss, and the POW
chimney; so they weren ’t talking about impairing revitalization, they ’re talking about blending the
two together and she thought that was the most important thing ; she was very excited about this
robust discussion
Josh Dix, Government Affairs Director , Charleston Trident Association of Realtors
He thanked the Commission for taking a hard look at preservation in West Ashley ; the
development community also didn ’t like fire drills, they cost a lot of money to go back to drawing
table and try again
The opportunity to clearly define what was historic, what characteristics needed to be met they
were in support of and looked forward to participating in that discussion; they asked that they not
do a moratorium
As West Ashley was starting to truly ful fill some of the West Ashley Plan items, they don ’t want to
send the wrong message to the development community and the investor community that West
Ash ley was closed for business
West Ashley Revitalization Commission
March 8, 2023 Page 23
He noted Mount Pleasant was cited a few times, Mount Pleasant was the most sued municipality
in the state of South Carolina , he didn ’t think Charleston wanted to rival them for that
He thanked them for their time and looked forward to working with them on historic preservation
ordinance
Catherine Anderson, resident of Avondale neighborhood representing some neighbors and herself
M any residents were not to safety changes that were happening at that intersection but the
quality of life and the life for those residents who live in the neighborhood hadn ’t been considered
in the project
The County was funding it, the City was claiming that it ’s a county project but the City had to
provide right-of-way ; she didn ’t hear any complaints about the Magnolia Road changes that were
being discussed
B ut they wanted the Commission to take some time to consider these changes before voting on it
for the City Council ; she thought DRB was going to be involved because there was also a 50+
year old building , the old Krispy Kreme, that had to be considered
They wanted the residents who lived there, not the commuters, to be considered as well; they
weren ’t against the safety benefits of this, it was the quality of life and what ‘s going to impact
residential streets
Breland Nelson, 1161 Northbridge Drive , owner Breland Suits and More, Northbridge Drive , said he was
present to get caught on the redevelopment project in the area of Publix . Chair Shahid said he would
catch him up.
Mr. Pohlman sad he received a phone call from Sharon Hill, who wanted to voice her opposition to the
realignment at Avondale Avenue.
Several emails were sent out to the Commission members :
Willie McL ane , Sha nnon Hall , Mandy Livingston, Kelley Mallard – Opposed to the apartments at
Ashley Landing Plaza
11 comments were submitted on their Innovate Page . Copies of these comments were attached to and
made a part of the original set of minutes.
Opposed to the apartments at Ashley Landing Plaza:
Harold Kroninger - Opposed to the apartments at Ashley Landing Plaza; questioned Donahue
and Bainbridge ditch cleaning
Gerald Barbaris – Opposed to Ashley Landing Plaza apartments
Jennifer Black - In favor the apartments at Ashley Landing Plaza
Deborah Nelson, Beth Radcliff – Opposed to apartments
Opposed to the Avondale Avenue road realignment:
Natalie Estes – W anted more information on it
Mandy and Cal Livingston
Robert Lucas – Wanted additional information
Zachary Jordan -Concerned about Avondale realignment and the potential parking deck being
incongruent with each othe r
Chair Shahid thanked everyone for attending the meeting tonight.
There being no further business to discuss, the meeting was adjourned at 7:48 p.m.
Marcia L. Grant
Administrative Assistant II
West Ashley Revitalization Commission
March 8, 2023 Page 24
Clerk of Council Department
Source: City of Charleston website. First collected Nov 19, 2026.