Agenda for [title]
Newberry County · Newberry County · Agenda packets
Open the original document More from Newberry County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
1
NEWBERRY COUNTY COUNCIL
COUNTY COUNCIL AGENDA
NEWBERRY COURTHOUSE ANNEX
1309 COLLEGE STREET, NEWBERRY, SC 29108
November 18, 2026
6:00 P.M.
1. Call to order: Karl Sease, Chairman.
2. Invocation and Pledge of Allegiance: Travis Reeder, Vice Chairman
3. Adoption of Minutes:
a. Newberry County Council Work Session Minutes – November 4, 2026.
b. Newberry County Council Minutes – November 4, 2026.
4. Approval of Agenda.
5. Proclamations/Resolutions:
6. Administrator’s Report:
c. Employee recognitions: Beth Conner (20 years, Assessor’s Office) and Sherry
Williams (20 years, NCSO).
d. Project Updates.
7. Chairman’s Comments.
8. Public Hearing:
e. Ordinance 11-01-2026. An Ordinance approving the execution and delivery of a
development agreement between Newberry County and SBS Holdings, LLC
regarding the Key Island Estates Project and other related matters.
9. Public Comments Regarding Items on the Agenda (three minutes).
10. Old Business:
2
f. Second Reading – Ordinance 11-01-2026. An Ordinance approving the execution
and delivery of a development agreement between Newberry County and SBS
Holdings, LLC regarding the Key Island Estates Project and other related
matters.
11. New Business:
g. Consideration and approval for a bid for Whitmire Subertown/Gary Street
Sidewalk CDBG 4-CE-22-09 (RFP 2026-01).
12. County Council may take action on matters discussed during executive session during
the 5 p.m. meeting.
13. Appointments.
14. Adjournment.
15. Future Meetings:
a. Thanksgiving Holiday – November 26-27 – Offices Closed.
b. Economic Development Committee – December 7 at 5 p.m.
c. Newberry County Council Work Session – December 16 at 5 p.m.
d. Newberry County Council – December 16 at 5 p.m.
e. Christmas Holiday – December 23-25 – Offices Closed.
NEWBERRY COUNTY COUNCIL WORK SESSION
NOVEMBER 4, 2026
MINUTES
PAGE 1
NEWBERRY COUNTY COUNCIL WORK SESSION
MINUTES
November 4, 2026
Newberry County Council met on Wednesday, November 4, 2026, at 5:00 p.m. in Council
Chambers at the Courthouse Annex, 1309 College Street, Newberry, SC, for a Work
Session.
Notice of the meeting was duly advertised, as required by law.
PRESENT: Karl Sease, Chairman
Leon Fulmer, Council Member
Todd Johnson, Council Member (Virtual)
Travis Reeder, Council Member
Johnny Mack Scurry, Council Member
Robert Shealy, Council Member
Stuart Smith, Council Member
Ted Luckadoo, County Administrator
Joanie Winters, County Attorney
Karen Brehmer, Deputy County Administrator
Debbie Cromer, Finance Director
Rick Farmer, Economic Development Director
Laura Kneece, Coroner
Eric Nieto, IT Director
Andrew Wigger, Clerk to Council/PIO
1. Call to order: Karl Sease, Chairman.
2. Discussion of the purchase of three new camera systems for the Newberry
County Coroner’s Office, contingent upon grant approval – Coroner Laura
Kneece.
• Ms. Kneece said they are requesting three standardized camera kits at an
estimated cost of $12,600 ($4,200 per kit) to improve the NCCO’s ability to
NEWBERRY COUNTY COUNCIL WORK SESSION
NOVEMBER 4, 2026
MINUTES
PAGE 2
document death scenes, injuries, identifying characteristics and other
relevant physical evidence.
• The grant to the NCCO office will be 100 percent funded. This grant is
through the Bureau of Justice.
• Mr. Smith asked how long it will take to obtain, once awarded; Ms. Kneece
estimated within 90 days.
• Mr. Luckadoo said there is no action that will need to be taken, but they
wanted to inform council of the intention to apply for the grant.
3. Executive Session:
a. Receipt of legal advice regarding the disposition of county owned
property.
b. Personnel Matter(s): Discussion regarding contractual and employee matters
related to Newberry County Council employees.
• Mr. Shealy made a motion to go into Executive Session; Mr. Scurry provided
the second and the motion carried 6-0, Mr. Johnson was not present for the
vote.
• Newberry County Council went into Executive Session at 5:04 p.m.
• Mr. Johnson arrived at the meeting virtually during the Executive Session.
• Mr. Fulmer made a motion to come out of Executive Session; Mr. Smith
provided the second and the motion carried 7-0.
• Newberry County Council came out of Executive Session at 6:03 p.m.
4. Adjournment.
• Mr. Reeder made a motion to adjourn; Mr. Scurry provided the second and
the motion carried 7-0.
• The Newberry County Work Session adjourned at 6:03 p.m.
NEWBERRY COUNTY COUNCIL WORK SESSION
NOVEMBER 4, 2026
MINUTES
PAGE 3
NEWBERRY COUNTY COUNCIL
Karl Sease, Chairman
Andrew Wigger, Clerk to Council
Minutes Approved: ________________
NEWBERRY COUNTY COUNCIL
NOVEMBER 4, 2026
MINUTES
PAGE 1
NEWBERRY COUNTY COUNCIL
MINUTES
November 4, 2026
Newberry County Council met on Wednesday, November 4, 2026, at 6:03 p.m. at the Newberry
County Council Chambers at 1309 College Street, Newberry, SC, for a regular scheduled
meeting.
Notice of the meeting was duly advertised, as required by law.
PRESENT: Karl Sease, Chairman
Travis Reeder, Vice-Chairman
Leon Fulmer, Council Member
Todd Johnson, Council Member (Virtual)
Johnny Mack Scurry, Council Member
Robert Shealy, Councilman
Stuart Smith, Council Member
Ted Luckadoo, County Administrator
Joanie Winters, County Attorney
Karen Brehmer, Deputy County Administrator
Major Ben Chapman, NCSO
Debbie Cromer, Finance Director
Sheriff Lee Foster, NCSO
Eric Nieto, IT Director
Katie Werts, Planning and Development Director
Andrew Wigger, Clerk to Council/PIO
1. Call to order: Karl Sease, Chairman.
• Mr. Sease called the meeting to order at 6:03 p.m.
2. Invocation and Pledge of Allegiance: Stuart Smith, Councilman.
• Mr. Smith led the Invocation and Pledge of Allegiance.
3. Adoption of Minutes:
a. Newberry County Council Work Session Minutes – October 21, 2026.
NEWBERRY COUNTY COUNCIL
NOVEMBER 4, 2026
MINUTES
PAGE 2
b. Newberry County Council Minutes – October 21, 2026.
• Mr. Fulmer made a motion to accept the minutes as presented; Mr. Smith provided
the second and the motion carried 7-0.
4. Approval of Agenda.
• Mr. Shealy made a motion to accept the agenda as presented; Mr. Scurry provided
the second and the motion carried 7-0.
5. Proclamations/Resolutions:
• None.
6. Administrator’s Report:
a. Project Updates.
• Mr. Luckadoo reminded everyone that the county offices would be closed on
Wednesday, November 11, 2026, for Veterans Day.
• The groundbreaking for the Amphitheater project would be Thursday, November
12, 2026, at 11 a.m. The Delinquent Tax Sale took place on Monday, November 9,
2026, at 9 a.m.
• New Safe Streets for All Community Engagement Sessions have also been
scheduled.
7. Chairman’s Comments.
• Mr. Sease thanked Ms. Cromer for her hard work helping with the elections over
the past months. He said with a short supply of people she went over and helped
the office.
• Mr. Sease said they have verified legal status requirements based on the contract
by legal counsel and the county administrator is a legal resident of Newberry
County.
8. Public Comments Regarding Items on the Agenda (three minutes).
• The following people spoke regarding the above-mentioned regarding legal
residence: Joe Trainor, Steve McKean, Forrest Byrd, Vicki Bilka, Becky Boland, Bill
NEWBERRY COUNTY COUNCIL
NOVEMBER 4, 2026
MINUTES
PAGE 3
Parr, Jody Hamm (signed up but passed), Jed Thomas, Tyler Turner (signed up but
passed).
9. Old Business:
• None
10. New Business:
a. First Reading – Ordinance 11-01-2026. An Ordinance approving the execution
and delivery of a development agreement between Newberry County and SBS
Holdings, LLC regarding the Key Island Estates Project and other related
matters.
• Mr. Shealy made a motion to accept first reading; Mr. Fulmer provided the second
and the motion carried 7-0.
11. County Council may take action on matters discussed during executive session
during the 5 p.m. meeting.
• Mr. Shealy made a motion that the county advertises parcel number 398.23, 1.66
acres on the corner of Main Street and Hillbrook Lane, for a minimum bid of
$360,000 with sealed bids and advertised on whatever sites the county advertises.
Mr. Scurry provided the second and the motion carried 7-0.
12. Appointments.
• Mr. Shealy made a recommendation for the appointment of Mr. Carroll Scott Koon
for the Newberry County Water and Sewer Authority; Mr. Fulmer provided the
second and the motion carried 7-0.
13. Adjournment.
• Mr. Shealy made a motion to adjourn; Mr. Fulmer provided the second and the
motion carried 7-0.
NEWBERRY COUNTY COUNCIL
NOVEMBER 4, 2026
MINUTES
PAGE 4
• Newberry County Council adjourned at 6:21 p.m.
NEWBERRY COUNTY COUNCIL
Karl Sease, Chairman
Andrew Wigger, Clerk to Council
Minutes Approved: ________________
Newberry County
Administration
1309 College Street
Newberry, SC 29108
803-321-2100
Agenda Briefing
Prepared By: Building & Zoning Director Title: Director of Building & Zoning
Department: Building & Zoning Division: Planning & Zoning
Date Prepared: October 28, 2026 Meeting Date: November 4, 2026 (1st Reading)
Legal Review: Pending County Attorney review Date: To be completed
Budget Review: To be determined Date: To be completed
Approved for Consideration: Pending Date: To be completed
Request Consideration by Committee / County
Council
County Council
Subject: Ordinance No. 11-01-2026 — Key Island Estates Development Agreement
STAFF’S RECOMMENDED ACTION:
Consider first reading of Ordinance No. 11-01-2026 approving the execution and delivery of a Development Agreement between Newberry
County and SBS Holdings, LLC for the Key Island Estates project, subject to required public hearings, subsequent readings, and County
Attorney review.
FIDUCIARY:
Are Funds allocated in the department's current fiscal year budget?
TBD
Yes No
If no, is a budget amendment necessary?
TBD
Yes No
ADDITIONAL FISCAL/BUDGETARY MATTERS TO CONSIDER:
The agreement provides for a $5,000 development fee per single-family detached residential lot, payable upon issuance of each building
permit (15 planned lots; potential total $75,000 if all are permitted). The developer bears road, water/sewer infrastructure, and
stormwater improvement costs as stated in the agreement. County fire services and other ordinary public-service impacts remain relevant.
No specific County appropriation or budget amendment is identified in the ordinance; budget determinations require Finance review.
COUNTY ATTORNEY’S OFFICE FEEDBACK/POSSIBLE AREA (s) OF LEGAL EXPOSURE:
County Attorney review and comments pending. Review statutory notice and public-hearing requirements, vested development rights and
applicability of future regulations, fee limitations, the three-year permit/commencement provisions, indemnification limits, and agreement
effectiveness/termination conditions. Confirm consistency of the agreement’s references and deadlines before final adoption.
SUMMARY DISCUSSION:
Ordinance No. 11-01-2026 would approve a Development Agreement with SBS Holdings, LLC for Key Island Estates, approximately 34.7
acres (portion of TMS No. 536-15), currently identified as RS zoning. The proposed subdivision consists of 15 single-family residential lots,
each at least two acres. The developer is responsible for internal roads and necessary SCDOT entrance/intersection improvements,
extension of public sewer service to lots 1–6, and required stormwater facilities. Lots 7–15 currently have water and sewer access. The
agreement has a ten-year term, requires applicable development permits, and provides for annual County compliance review.
ADDITIONAL COMMENTS FOR CONSIDERATION:
The ordinance lists first reading for November 4, 2026; public hearing and second reading for November 18, 2026; and a further public
hearing and third reading for December 16, 2026. The agreement states that recorded deed copies must be delivered to the County
Administrator by December 16, 2026 or it automatically terminates; confirm timing with legal counsel. The development schedule
anticipates completion and lot sales in approximately 12 months after subdivision plan approval.
ATTACHMENTS:
Ordinance No. 11-01-2026, including proposed Development Agreement and Exhibits A–C (property description/plat, development
program, and development schedule).
STATE OF SOUTH CAROLINA )
) ORDINANCE NO. 11-01-2026
NEWBERRY COUNTY )
AN ORDIANNCE APPROVING THE EXEUCTION AND DELIVERY OF A
DEVELOMENT AGREEMENT BETWEEN NEWBERRY COUNTY AND SBS
HOLDINGS, LLC REGARDING THE KEY ISLAND ESTATES PROJECT AND OTHER
RELATED MATTERS.
WHEREAS, the South Carolina Local Government Development Agreement Act,
S.C. Code Ann. §§ 6 -31-10 et seq. (the “Act”), authorizes local governments to enter into
development agreements in accordance with the requirements of the Act; and
WHEREAS, Newberry County (the “County”) has received a proposed Development
Agreement with SBS Holdings, LLC (the “Developer”), concerning a development known as
Key Island Estates (the “Development Agreement”); and
WHEREAS, the Development Agreement identifies the property as approximately
34.7 acres in Newberry County, further identified as a portion of TMS No. 536 -15 and
described in Exhibit A to the Development Agreement (the “Property”); and
WHEREAS, the Development Agreement descr ibes a proposed development of
fifteen (15) single -family residential lots, with a minimum lot size of two (2) acres, subject
to the terms, exhibits, and conditions set forth in the Development Agreement; and
WHEREAS, County Council desires to approve the Development Agreement in the
form attached to this Ordinance as Ordinance Exhibit A, following compliance with the
applicable notice, hearing, and procedural requirements of the Act and County
ordinances;
NOW, THEREFORE, BE IT ORDAINED that:
ARTICLE 1
GENERAL
Section 1.01. Incorporation. The above recitals are incorporated in this Agreement as if
the recitals were set out in this Agreement in its entirety. The findings contained in the Act
are incorporated into this Agreement as if it were set out in this Agreement in its entirety.
Section 1.01. Definitions.
A. In addition to those vest pocket definitions contained throughout this Agreement,
as used in this Agreement, the following terms have the following meanings.
1) “County Council” means the governing body of County.
2) “Development Rights” means the right of Developer to develop all or part of
the Property in accordance with this Agreement.
3) “Ordinance No. 11-01-2026” means Ordinance No. 11-01-2026 of County
which is cited as the Development Agreement Ordinance for Newberry
County, South Carolina.
4) “Zoning Ordinance” means the Zoning Ordinance, enacted December 24,
2001, and amended June 11, 2016, as amended to be the most current
adopted version on file with the County.
5) “LDR” means the Land Development Ordinance, enacted November 5, 2025,
amended to be the most current adopted version on file with the County.
B. Unless the context clearly indicates otherwise, terms not otherwise defined in this
Agreement have the meanings set forth in the Act and Ordinance, or the Zoning
Ordinance and LDR.
Section 1.03. Parties. The Parties to this Agreement are County and Developer.
Section 1.04. Property. This Agreement applies to one parcel of land comprising
approximately 34.7 acres identified as Tax Map No. 536-15, which is reflected on Exhibit A,
attached hereto, and incorporated herein by reference as if the exhibit were set out in this
Agreement in its entirety.
Section 1.05. Zoning. The property is currently zoned RS.
Section 1.06. Development Program.
A. The Zoning Ordinance and LDR provide for the development uses on the Property,
including population densities, building intensities and heights.
B. All lots for the Development must meet all standards contained in the most current
version of the Zoning Ordinance and LDR unless otherwise modified by this
Agreement. In the event of conflict between the standards contained in the Zoning
Ordinance and the LDR and this Agreement, the terms of this Agreement control.
The Development Program for the Property is set forth in Exhibit B, attached hereto
and incorporated herein by reference as if the exhibit were set out in the Agreement
in its entirety.
Section 1.07. Development Schedule.
A. The estimated development schedule for the Property is set forth on Exhibit C,
attached hereto and incorporated herein by reference as if the exhibit were set out
in the Agreement in its entirety.
B. County and Developer acknowledge that the development schedule is an estimate.
The failure of Developer to meet a commencement or completion date does not, in
and of itself, constitute a material breach of this Agreement, but must be judged
based on the totality of the circumstances. The development schedule is a
planning and forecasting tool only. County and Developer acknowledge that actual
development is likely to take place at a different pace than set forth in the
development schedule because of future market forces.
C. County agrees that if Developer requests an adjustment to the development
schedule, including commencement dates and interim completion dates, then the
dates must be modified in Developer is able to demonstrate and establish that
there is good cause to modify those dates. “Good cause” includes, but is not
limited to, changes in market conditions, provided, however, under no
circumstances shall (i) commencement of construction occur on or after a date
that is three (3) years from the effective date of this Agreement. Without
modification, the Developer must apply for and be approved for the appropriate site
work permits within three (3) years from the effective date of the Agreement or the
zoning will revert back to the original classification.
D. Periodic adjustments to the development schedule do not require a formal
amendment to this Agreement and are not considered a major modification. To
adjust the development schedule, Developer shall submit a proposed adjustment
to the Clerk to Council who shall forward copies of the proposed adjustment to
each member of County Council. The proposed adjustment must be accompanied
by an explanation and justification. The proposed adjustment is effective 60 days
from receipt by the Clerk to Council unless County Council has disapproved the
proposed adjustment by adoption of a resolution to that effect within the 60-day
period.
Section 1.08. Relationship of Parties. The Agreement creates a contractual relationship
between the Parties. The Agreement is not intended to create, and does not create the
relationship of partnership, joint venture, or any other relationship wherein any one of the
parties may be held responsible for the acts of any other party. This Agreement is not
intended to create and does not create a relationship whereby any one of the parties may
be rendered liable in any manner for the debts or obligations of any other party, to any
person or entity whatsoever, whether the debt or obligation arises under this Agreement or
outside of this Agreement.
Section 1.09. Benefits and Burdens.
A. The Parties agree that the burdens of this Agreement are binding upon, and the
benefits of this Agreement shall inure to, all successors in interests to the Parties to
this Agreement.
B. Except for the owners and lessees of completed residence on individual lots who
are the end users and not developers thereof and the owners and lessees of
individual lots, who are not developers and who intend to build a residence on the
lot for the owner or lessee to occupy, any purchaser or other successor in title is
responsible for performance of Developer’s obligations pursuant to this Agreement
as to the portion of the Property so transferred. Developers must give notice to
County of the transfer of property to a developer in the manner prescribed in
Section 3.05.
C. Developer acknowledges and agrees that it and its successors and assigns (i) are
responsible for the development of the Property when Developer acquires title to or
Development Rights for the Property, and (ii) will develop the Property in
accordance with the terms and conditions of this Agreement, and (iii) acknowledge
agricultural activities, including but not limited to, production of crops, animal
husbandry, land application of animal waste, the raising, breeding, and sale of
livestock and poultry, including confinement feeding operations, use of farm
machinery, and the sale of farm products may be practiced and take place in the
area of the Property. The Developer stipulates and will include such notice of
agricultural activities in the homeowners’ association documents and restrictive
covenants, and more specifically in a standalone restrictive covenant, for the
Property so all subsequent owners are aware of such agricultural activities. The
Developer shall remain fully vested with all of the rights, benefits, and privileges
arising out of this Agreement during the Term of this Agreement except as may be
assigned for assumed from time to time consistent with this Agreement.
Section 1.10. Term. The term of this Agreement commences on the effective date of
this Agreement and terminates Ten (10) years thereafter, such that at the end of the
Tenth-year term, Developer no longer has any Development Rights, vested rights,
and/or any other rights in the Property that arise out of or relate to this Agreement.
Section 1.11. Required Information. Ordinance No. 11-02-2025 requires a
development agreement to include certain information. Exhibit D contains the required
information or identifies where the information may be found in this Agreement. Exhibit
D is attached hereto and incorporated herein by reference as if the exhibit were set out
in this Agreement in its entirety.
ARTICLE II
REPRESENTATIONS AND WARRANTIES
Section 2.01. Representations and Warranties of County.
A. County has found that the development permitted by this Agreement is consistent
with the County’s comprehensive plan and Zoning Ordinance.
B. County has approved this Agreement by adoption of Ordinance No. 11-01-2026 in
accordance with the procedural requirements of the Act, Ordinance 11-02-2025
and any other applicable state law.
C. County represents that prior to the final reading of Ordinance No. 11-01-2026 that
at least two public hearings were held after publication of the required notice and
the publication of a notice of intent to consider a proposed development
agreement.
Section 2.02. Representations of Warranties of Developer.
A. Developer represents that to its best knowledge the number of acres of highland
contained in the Property (i.e., land outside of a designated flood plain) is greater
than 25 acres.
B. Developer represents that, as of the Agreement Date, it has contractual rights to
acquire the Property and has in fact acquired the property.
C. Developer represents and warrants that the execution, delivery, and performance
by the respective individual or entity signing this Agreement on behalf of the party
has been duly authorized and approved by all requisite action on the part of
Developer.
ARTICLE III
DEVELOPMENT RIGHTS
Section 3.01. Vested Right to Develop.
A. County agrees that Developer, upon receipt of its development permits as identified
in Section 3.04, may proceed to develop the Property according to this Agreement,
the Zoning Ordinance, and the LDR. The right to Developer to develop Property as
set forth in this Agreement is deemed vested with Developer for the term of this
Agreement when Developer has complied with all requirements of Section 5.19 of
this Agreement.
B. County agrees that the specific Laws and Landing Development Regulations in
force as of the Agreement Date as set forth in Exhibit E to this Agreement, attached
hereto and incorporated herein by reference as if the exhibit were set out in this
Agreement in its entirety, shall govern all aspects of the development of the
Property, according to this Agreement, for the term of this Agreement.
C. Developer has a vested right to proceed with the development of the Property in
accordance with the zoning classification set forth in Zoning Ordinance No. 6-11-
2026, the Zoning Ordinance, the LDR and the terms of this Agreement if and only if
Developer has complied with all the requirements of Section 5.19 of this
Agreement.
D. To the extend that this Agreement may contain zoning and development standards
which conflict with existing zoning and development standards, including zoning
and development standards contained in the Zoning Ordinance and LDR, the
standards contained in this Agreement supersede all other standards and this
Agreement is deemed controlling.
Section 3.02. Effect on Vested Rights Act and County Ordinance No.05-16-2022 The
Parties agree that vested rights conferred upon Developer in this Agreement are not
affected by the provisions of this Vested Rights Act, codified as South Carolina Code
Annotated Sections 6-29-1510 through and including 1560, as amended, or the provisions
of Ordinance No. 05-16-2022 County’s ordinance relating to the Vested Rights Act.
Section 3.03. Applicability of Subsequently Adopted Laws and Land Development
Regulations.
A. It is recognized that laws and regulations will periodically change. County may
apply laws adopted after the execution of this Agreement to the development of the
Property unless said adopted laws prevent or materially hinder development in the
manner set forth in this Agreement.
B. Notwithstanding the provisions of subsection (A) of this Section, County agrees that
if County imposes a moratorium or other similar restriction that would curtail or
hinder the rate at which development can occur, then the moratorium or other
similar restriction shall not apply the Development of the Property.
C. Developer agrees to comply with any county-wide storm water regulations, building,
housing, electrical, plumbing, and gas codes adopted by County after the
Agreement Date and in force at the time plans for buildings are submitted to County
for review. Nothing in this Agreement is intended to supersede or contravene the
requirements of any storm water, building, housing, electrical, plumbing, or gas
code adopted by County.
Section 3.04. Development Permits.
A. Notwithstanding this Agreement, Developer shall obtain all local development
permits for the development of the Property. Local development permits,
approvals, and processes, some of which may have been obtained or complied with
as of the Agreement Date, may include, but are not limited to:
1. Site plan approval;
2. Preliminary plan approval
3. Final plat approval;
4. Zoning permits;
5. Building permits; and
6. Sign permits.
B. The failure of this Agreement to address a particular permit, condition, term, or
restriction does not relieve Developer of the necessity of complying with the law
governing the permitting requirements, conditions, terms, or restrictions.
Section 3.05. Non-Transfer of Development Rights. Developer is not permitted to assign
or transfer its Development Rights to other successor or substitute developer(s) without
expressly written permission of the County, which permission shall not be unreasonably
withheld. This provision does not apply to the purchaser or other successor in title to
Developer who is the owner or lessee of a completed residence and is the end user and not
Developer thereof or who is the owner of lessee of an individual lot, who is not a developer
and who intends to build a residence on the lot for the owner or lessee to occupy.
ARTICLE IV
DEDICATIONS AND FEES AND RELATED AGREEMENTS
Section 4.01. Purpose of Article. The Parties understand and agree that Development of
the Property imposes certain burdens and cost of the County, including those for certain
services and infrastructure improvements. Eventually, ad valorem taxes collected from
the property may, but are not necessarily guaranteed to, meet, or exceed the burdens and
costs placed on County, but certain initial costs and capital expenditures are now required
that are not to be funded by any increase in taxes paid by existing residents of County. The
purpose of this article is to identify the matters agreed upon to be provided by Developer to
mitigate such burdens and costs.
Section 4.02. Other Charges or Fees.
A. The Property shall be subject to development and/or permit fees enacted by the
County that are in effect on the Agreement Date, of County-wide application and
that relate to the County’s costs of processing applications, issuing development
permits, reviewing plans, conducting inspections, or similar type processing costs.
The property shall not be subject to any additional development and/or permit fees
enacted by the County after the Agreement Date, however characterized.
B. All units and attached dwellings shall be subject to a development fee in the
amount of Five Thousand Dollars and No Cents ($5,000) per lot for the development
of single-family detached homes and Four Thousand, Two Hundred, Fifty Dollars
and No Cents ($4,250.00) per dwelling unit for the development of single-family
attached and multi-family residential units, payable by the building permit applicant
to the County at the time of issuance of each respective building permit.
Section 4.03. Infrastructure and Services. The Parties recognize that most of the direct
cost associated with the Development of the Property will be borne by Developer, and
many necessary infrastructure improvements and services will be provided by Developer
or other governmental or quasi-governmental entities, and not by County. For clarification,
the Parties make specific note of and acknowledge the following:
A. Roads. Developer is responsible for the construction and cost of all roads, whether
for public or private use, within the Property including but not limited to any
necessary entrance and intersection improvements as required by the South
Carolina Department of Transportation related to the development of the Property.
All roads must be constructed in accordance with County’s road standards in effect
of the date of this Agreement. The road improvements are expected to be
implemented on a schedule consistent with the development of the Property as
contained in the development schedule and as necessary to serve the
development. Developer is also responsible for maintenance of all roads that are
not public roads. Developer acknowledges that County will only consider accepting
as public roads those roads constructed in full compliance with the LDR and the
County’s road standards in effect at the time of execution of this Agreement and
providing connectivity to County Road system. County will not accept the roads
within the Property into County road system for any other purpose, including, but
not limited to, maintenance.
B. Potable Water, Sewage Treatment, and Disposal. Potable water, sewage treatment
and disposal will all be supplied to the Property by one or more of the following:
Newberry Water and Sewer Authority, and/or some other public or private entity.
County is not responsible for any construction, treatment, maintenance, or costs
associated with water or sewer service or water and sewer service infrastructure to
or within the Property. Developer acknowledges that County has no authority or
responsibility for providing potable water services or sewer services in County and
that each service provider is a separate apart and distinct from County over which
County has no control.
C. Storm Water Management. Developer will construct or cause to be constructed all
storm water runoff and drainage improvements within the Property required by the
development of the Property and such infrastructure will be maintained by
Developer or a homeowners’ association. County is not responsible for any
construction, maintenance or costs associated with the storm water runoff and
drainage for the Property. Storm water management improvements are expected to
be implemented on a schedule consistent with the development of the Property as
contained in the development schedule and as necessary to serve the
development.
D. Solid Waste Collection. County shall provide solid waste collection to the Property
on the same basis as is provided to other residents and businesses in County. It is
understood and acknowledged that County does not presently provide solid waste
disposal for single, multi-family or commercial developments. Residential units
shall be served by a private waste hauling company.
E. Fire Servies. The Property is in the fire service area of Newberry County and fire
services will be provided by Newberry County, or its successor entities.
F. School Services. Public school services are not provided by the Newberry County
School District. Developer acknowledges that County has no authority or
responsibility for providing.
MISCELLANEOUS
Section 5.01. Notices. Any notice, election, demand, request or other communication to
be provided under this Agreement shall be in writing and shall be effective (i) when
delivered to the party named below, (ii) when deposited with the United States Postal
Service, certified mail, return receipt requested, postage prepaid, or (iii) when deposited in
Federal Express (or any other reputable national “next day” delivery service) addressed as
follows (or addressed to such other address as any party shall have previously furnished in
writing to the other party), except where the terms hereof require receipt rather than
sending of any notice, in which case such provision shall control:
To County: Newberry County, South Carolina
Attn: Ted Luckadoo, Couty Administrator
1309 College Street (hand delivery/courier service)
Post Office Box 156
Newberry, South Carolina, 29108
With a Copy to (does not constitute notice):
Attn: Joanie Winters, County Attorney
1309 College Street (hand delivery/courier service)
Post Office Box 156
Newberry, South Carolina, 29108
And to Developer: SBS Holdings, LLC
Attention: Trey Harrell
454 Lemonts Road
Chapin, SC 29036
With a Copy to (does not constitute notice):
Section 5.02. Amendments.
A. This Agreement may be amended or cancelled by mutual consent of the parties to
the Agreement. An amendment to this Agreement must be in writing. No
statement, action or agreement made after the Agreement Date shall be effective to
change, amend, waive, modify, discharge, terminate or effect an abandonment of
this Agreement in whole or in part unless such statement, action or agreement is in
writing and signed by the party against whom the change, amendment, waiver,
modification, discharge, termination, or abandonment is sought to be enforced.
B. An amendment to this Agreement with the exceptions identified for Exhibit B, must
be processed, and considered in the same manner as set forth in Ordinance 11-02-
2025 for a proposed development agreement. Any amendment to this Agreement
constitutes a major modification and the major modification may occur only after
public notice and public hearing by County Council.
C. This Agreement must be modified or suspended as may be necessary to comply
with any state or federal laws or regulations enacted after the Agreement Date
which prevents or precludes compliance with one or more of the provisions of this
Agreement but only to the extent necessary to effectuate compliance with the state
or federal law….
Section 5.03. Periodic Review. At least every 12 months, the Building and Zoning Director
for County, or the designee of the Building and Zoning Director for County, must review
compliance with this Agreement by Developer. At the time of review Developer must
demonstrate good faith compliance with the terms of the Agreement.
Section 5.04. Breach of Agreement.
A. If, as a result of the periodic review provided in Section 5.03 of this Agreement or at
any other time, the Newberry County Building and Zoning Director, or the Building
and Zoning Director’s designee, determines that Developer has committed a breach
of the terms or conditions of this Agreement, then the Newberry County Building
and Zoning Director shall serve notice in writing, within a reasonable time after the
periodic review, on Developer setting forth the nature of the breach and the
information supporting the determination, and providing Developer a reasonable
time in which to cure the breach.
B. If Developer fails to cure the breach within a reasonable time and is not proceeding
expeditiously and with diligence to cure the breach (which cure period shall be at
least thirty (30) days after written notice thereof from County and extended by
mutual agreement between the Developer and the County Administrator, if the
nature thereof required additional time so long as Developer commences the cure
within the original thirty (30) day period and continues the same with due diligence
to its completion), then County may unilaterally terminate or modify this
Agreement. Prior to terminating or modifying this Agreement as provided in this
section, the Cunty must first give Developer the opportunity (i) to rebut the
determination, or (ii) to consent to amend the Agreement to meet the County’s
concerns with respect to the determination.
Section 5.05. Enforcement. The Parties shall each have the right to enforce this
Agreement, if not cured within the applicable cure period, by any remedy available at law
or in equity, including specific performance, and the right to recover attorney’s fees and
costs associated with enforcement.
Section 5.06. No Third-Party Beneficiary. The provisions of this Agreement may be
enforced only by the Parties. No other person, natural or corporate, shall have any rights
hereunder.
Section 5.07. Recording of Agreement. The Parties agree that Developer shall record this
Agreement with County Clerk of Court within fourteen (14) business days of the date of
execution of the Agreement.
Section 5.08. Administration of Agreement. County is the only local government entity
that is a party to this Agreement and County is responsible for the Agreement’s
administration.
Section 5.09. Effect of Annexation and Incorporation. The Parties agree that this
Agreement remains in effect if the Property is, in whole or in part, included in any
municipality. The Parties acknowledge that upon incorporation or annexation, the
application and duration of this Agreement is controlled by Section 6-31-110 of the Act.
County reserves the right to enter into an agreement with the newly incorporated
municipality or the annexing municipality for the administration and enforcement of this
Agreement after the date of incorporation or annexation.
Section 5.10. Estoppel Certificate. Any of the Parties may, at any time, and from time to
time, deliver written notice to the other party requesting the party to certify in writing: (i)
that this Agreement is in full force and effect, (ii) that this Agreement has not been
amended or modified, or if so amended, identify the amendments, and (iii) whether, to the
knowledge of the party, without inquiry, the requesting party is in default or claimed default
in the performance of its obligation under this Agreement, and, if so, describing the nature
and amount, if any, of any such event has occurred or failed to occur which, with the
passage of time or the giving of notice, or both, would constitute a default and, if so,
specifying each such event.
Section 5.11. Entire Agreement. This Agreement sets forth, and incorporates by reference
all the agreements, conditions, and understandings among the Parties relative to the
Property and its Development and there are no promises, agreements, conditions, or
understandings, oral or written, expressed or implied, among the Parties relative to the
matters addressed in this Agreement other than as set forth or as referred to in the
Agreement.
Section 5.12. Covenant to Sign other Documents. County and Developer acknowledge
that the consummation of the transactions contemplated by this Agreement may require
the execution contemporaneously with the execution of this Agreement and thereafter of
certain documents in addition to this Agreement and County and Developer agree to
cooperate with the execution thereof.
Section 5.13. construction of Agreement. The Parties agree that each party and its
counsel have reviewed and revised this Agreement and that any rule of construction to the
effect that ambiguities are to be resolved against the drafting party shall not apply in the
interpretation of this Agreement or any amendments or exhibits to this Agreement.
Section 5.14. Assignment. The rights, obligation, duties, and responsibilities developed
by this Agreement on or to Developer are assignable to any other person, firm, corporation,
or entity, except that the assignment must conform to the requirements of Section 1.09
and Section 3.05. County may assign its rights, obligations, duties, and responsibilities
devolved by this Agreement on or to County to any other person, firm, corporation, or
entity.
Section 5.15. Governing Law; Jurisdiction; and Venue.
A. This Agreement is governed by the laws of the State of South Carolina
B. The Parties agree that jurisdiction and venue for disputes relating to this Agreement
is the 8th Judicial Circuit of the State of South Carolina.
Section 5.16. Counterparts. This Agreement may be executed in several counterparts in
original, facsimile, or electronic means, provided such means of execution are sufficient
for recording, each of which shall be deemed an original, and such counterparts shall
constitute but one and the same instrument.
Section 5.17. Eminent Domain. Nothing contained in this Agreement shall limit, impair, or
restrict County’s right and power of eminent domain under the laws of the State.
Section 5.18. Severability. If any provision in this Agreement or the application of any
provision of this Agreement is unenforceable, then that unenforceability shall apply only to
the unenforceable provision, and the remaining provisions of this Agreement, and the
application of this Agreement or any other provision of this Agreement, shall remain in full
force and effect. However, if the unenforceable provision would prevent or materially
impair County’s and Developer’s right or ability to complete performance of this
Agreement, then the Parties agree to use their best efforts to renegotiate that provision to
provide that affected party with the ability completely to perform this Agreement.
Section 5.19. When Agreement takes Effect. This Agreement is dated as of the Agreement
Date and takes effect when (i) County and Developer have each executed the Agreement,
and (ii) Developer has delivered to County Administrator clocked-in copies, with book and
page numbers, of the recorded deeds conveying the Property to Developer. If County
Administrator has not received clocked-in copies of the deeds conveying the Property to
Developer by December 16, 2026, then this Agreement is automatically terminated without
further action of either the County or Developer. The obligation of Developer pursuant to
Section 4.02 is effective on the date the last Party to sign this Agreement executes this
Agreement and the obligations imposed on Developer pursuant to Section 4.02 survives
the termination of the Agreement pursuant to this Section.
An Indemnified Party may not avail itself of the indemnification or reimbursement of costs
provided in this Section unless it provides the Developer with prompt notice, reasonable
under the circumstances, of the existence or threat of any claim or liability, including,
without limitation, copies of any citations, orders, fines, charges, remediation request, or
other claims or threats of claims, in order to afford the Developer notice, reasonable under
the circumstances, within which to defend or otherwise respond to a claim.
Section 5.20. Indemnification Covenants.
A. Except as provided in paragraph (d) below, the Developer shall indemnify and save
the County, its employees, elected officials, officers and agents (each, an
“Indemnified Party”) harmless against and from all liability or claims arising from
the County’s execution of this Agreement, performance of the County’s obligation
under this Agreement or the administration of its duties pursuant to this Agreement
or the administration of its duties pursuant to this Agreement, or otherwise by virtue
of the County having entered into this Agreement.
B. The County is entitled to use counsel of its choice and the Developer shall
reimburse the County for all its costs, including attorneys’ fees, incurred in
connection with the response to or defense against such liability or claims as
described in paragraph (a), above. Said costs shall not exceed Five Thousand &
00/100 ($5,000.00) Dollars. The County shall provide a statement of the costs
incurred in the response or defense, and the Developer shall pay the County within
30 days of receipt of the statement. The Developer may request reasonable
documentation evidencing the costs shown on the statement. However, the
County is not required to provide any documentation which may be privileged or
confidential to evidence of the costs.
C. The County may request the Developer to resist or defend against any claim on
behalf of an Indemnified Party. On such request, the Developer shall resist or
defend against such claim on behalf of the Indemnified Party, at the Developer’s
expense. The Developer is entitled to use counsel of its choice, manage, and
control the defense of or response to such claim for the Indemnified Party; provided
the Developer is not entitled to settle any such claim without the consent of the
Indemnified Party.
D. Notwithstanding anything in the Section or this Agreement to the contrary, the
Developer is not required to indemnify and Indemnified Party against or reimburse
the County for costs arising from any claim or liability (i) occasioned by the acts of
the Indemnified Party, which are unrelated to the execution of this Agreement,
performance of the County’s obligations under this Agreement, or the
administration of its duties under this Agreement, or otherwise by virtue of the
County having entered into this Agreement; or (ii) resulting from that Indemnified
Party’s own negligence, bad faith, fraud, deceit, or willful misconduct.
E. An Indemnified Party may not avail itself of the indemnification or reimbursement of
costs provided in this Section unless it provides the Developer with prompt notice,
reasonable under the circumstances, or the existence or threat of any claim or
liability, including, without limitation, copies of any citations, orders, fines, charges,
remediation request, or other claims or threats of claims, in order to afford the
Developer notice, reasonable under the circumstances, to defend or otherwise
respond to a claim.
Section 5.21. General Terms and Conditions.
A. Agreements to Run with the Land. The agreement shall be recorded against the
Property as described in Exhibit A. The agreements contained herein shall be
deemed to run with the land.
B. No Waiver. Failure of a Party hereto to exercise any right hereunder shall not be
deemed a waiver of any such right and shall not affect the right of such Party to
exercise at some future time said right or any other right it may have hereunder
C. Merger. This Agreement, coupled with its Exhibits which are incorporated herein by
reference, shall state the final and complete expression of the Parties’ intentions
with respect to the matters set forth herein. All prior negotiations and
representations are superseded and merged herin.
Exhibit A
Exhibit B
Development Program
The development shall conform to all zoning ordinance requirements and LDR.
The development is planned for 15 single family residences with a minimum lot size of two
acres.
Each lot will have access to public water and sewer via. Newberry County Water and Sewer
Authority. Currently, each lot has access to public water. Lots 7-15 have access to public
sewer. The sewer line will be extended by developer for access to lots 1-6. Capacity for
Water and Sewer has been verified.
There will be no mass grading. Buffers will be adhered to.
Exhibit C
Development Schedule
Once the subdivision plan is approved, lots 7-15 that already have access to water and
sewer are anticipated to be sold within six months.
Simultaneously, the sewer line extension will be engineered and installed for the remaining
lots 1-6.
Anticipated project completion and sale of lots is twelve months.
AND IT
NEWBERRY COUNTY COUNCIL
(SEAL)
By:_______________________________
Karl Sease, Chairman
(SEAL)
Attest:
_________________________________
Andrew Wigger, Clerk to Council
Approved as to form:
____________________________________
Joanie Winters, County Attorney
_____________________________________
William Theodore Luckadoo
County Administrator
1st Reading: November 4, 2026
Public Hearing: November 18, 2026
2nd Reading: November 18, 2026
Public Hearing: December 16, 2026
3rd Reading: December 16, 2026
Page1of1
WhitmireSubertownRoad/GaryStreetSidewalkProject
BidTabulation
CDBGProject#4-CE—22-009
{$_’$‘.THE4"§;‘‘\.LANDPLANGROUPSOUTH
!%V’“’3'Landscapef‘mmteclmeIEngineeringIPtannmg
Wt.‘d’ ’f
l,CharlesW.HowellJr,CERTIFYTHATTHIS
ISATRUEANDCORRECTTABULATIONOFBIDS
RECEIVEDONOctober29,2026
Bidder#1 Bidder#2 Bidder#3 Bidder#4 Bidder#5 Bidder#6
SCLandscapeArchitect#730 AOSSpecialtyContractorsME.Contracting,Inc. FirstConstructionMng. ARConstruction$1.BlackConstructionCo. W.E.Baker&SonInc.
ITEMNO. DESCRIPTION QTY.UNITUNITPRICETOTALPRICEUNITPRICETOTALPRICEUNITPRICETOTALPRICEUNITPRICETOTALPRICEUNITPRICETOTALPRICEUNITPRICETOTALPRICE
‘I Mobilization 1 LS $61‘683.00$61,68300$49,822.57$49,822.57]$94,500.00$94,500.00$56,273.00$56,273.00$55,000.004$i55,000.00 $27,500.00
2 TramcControl 1 LS $68,331.00$68,331.00$90,970.98$90,970.98]$98,250.00$98,250.00$23,661.00$23,661.00$40,000.00.E-E$4O,OOO.00$42,000.00
3 Demolition 1 LS $54,176.00$54,176.00$42,077.95$42,077.95]$67,900.00$67,900.00$24,796.00$24,796.00$250,000.00$250,000.00 $44,150.00
4 DrainagePipe
a)15"RCP—Classiii 8 LF $191.10$1,528.80$311.69$2,493.52$275.00$2,200.00$130.00$1,040.00$280.00$2,240.00 $0.00
b)18"RCP—Classiii 160 LF $153.00$24,480.00$311.69 $49,870.40$230.00$36,800.00$142.00$22,720.00$350.00$56,000.00$120.00$19,200.00
c)24"RCP-ClassIll 16 LF $301.75 $4,828.00$374.03$5,984.48$300.00$4,800.00$166.00$2,656.00$300.00$4,800.00$305.00$4,880.00
d)PipeConnectiontoExistingStructure 1 EA $2,361.00 $2,361.00 $5,454.55$5,454.55$2,975.00$2,975.00$675.00 $675.00$2,500.00$2,500.00$3,000.00$3,000.00
e)ConcreteFlaredEnd 3 EA $3,356.00$10,068.00$1,558.44$4,675.32$3,600.00$10,800.00$2,400.00$7,200.00$3,500.00$10,500.00$2,600.00$7,800.00
5 Droplnlets,CatchBasins,andJunctionBoxes‘ ‘ a)CatchBasin—Type1 1 EA $7,748.00$7,748.00$6,000.00$6,000.00$7,200.00$7,200.00$7,300.00$7,300.00$7,500.00$7,500.00$8,600.00$8,600.00
b)CatchBasin-Type9 2 EA $5,734.15$11,468.30$6,000.00$12,000.00$7,750.00$15,500.00$7,045.00$14,090.00$8,500.00$17,000.00$7,200.00$14,400.00=="i
c)36"x36"JunctionBox 4 EA $5,103.25$20,413.00$6,670.13$26,680.52$7,150.00$28,600.00$6,650.00$26,600.00$8,500.00$34,000.00$7,500.00$30,000.00
d)AdjustExistingCatchBasinLid 1 EA $565.15 $565.15$3,896.11$3,896.11$3,450.00$3,450.00$650.00 $650.00$2,500.00$2,500.00$2,500.00$2,500.00
e)ConvertExistingCatchBasintoJunctionBox 1 EA $2,899.25$2,899.25$3,896.11$3,896.11$5,595.00$5,595.00$1,500.00$1,500.00$3,500.00$3,500.00$2,800.00$2,800.00
6 ConcreteCurbandGutter
a)BarrierCubandGutter 780 LF $40.10$31,278.00$124.68$97.250.40$39.75$31,005.00$45.00$35,100.00$38.00$29,640.00$45.00$35,100.00
b)TrasitionCurb 6 LF $170.70$1,024.20$1,16883 $7,012.98$68.00 $408.00 $42.00 $252.00$45.00 $270.00$45.00 $270.00
c)ConcreteSidewalkRetainingCurb 145 LF $80.60$11,687.00$124.68$18,078.60$61.00 $8,845.00$98.00$14,210.00$45.00$6,525.00$75.00$10,875.00
7 ConcretePaving
a)ConcreteSidewalk(4"Uniform) 1140SY $118.35$134,919.00$187.01$213,191.40$6900 $78,660.00$126.00$143,640.00$70.00$79,800.00$140.00$159,600.00
b)ConcreteSidewalk(6"Uniform) 3O SY $127.50$3,825.00$202.60$6,078.00$97.00 $2,910.00$136.00$4,080.00$115.00$3,450.00$160.00$4,800.00
c)ConcreteDriveway(6"Uniform) 90 SY $131.00$11,790.00$202.60$18,234.00$99.00 $8,910.00$120.00$10,800.00$125.00$11,250.00$160.00$14,400.00
d)PedestrianCurbRamp 40 SY $169.00$6,760.00$202.60$8,104.00$195.00$7,800.00$250.00$10,000.00$45.00$1,800.00$175.00$7,000.00
e)DetectableWarningSurface 120 SF $ 53.50 $6,420.00$94.60$11,352.00$73.00 $8,760.00$80.00$9,600.00$70.00$8,400.00$37.50$4,500.00
re= »:.—sr~{—.;'-!=|.
8 FullDepthAsphaltPatch 3O SY $133.00$3,990.00$150.65$4,519.50I$345.00$10,350.00$44.00$1,320.00$150.00$4,500.00$12,250.00$367,500.00
9 PourinPlaceConcreteWall
a)8"WideWall 96 LF $423.20$40,627.20$292.99$28,127.04$625.00$60,000.00$328.50$31,536.00$750.00$72,000.00$70.00$6,720.00
b)10"WideWall 315 LF $407.00$128,205.00$292.99$92,291.85$625.00$196,875.00$290.00$91,350.00$800.00$252,000.00$75.00$23,625.00
1O 36"TallMetalRailing 303 LF $146.15$44,283.45$233.77$70,832.31]$68.00$20,604.00$203.00$61,509.00$200.00$60,600.00$105.00$31,815.00
11 PermananentPavementMarkings 1 LS $1,842.50$1,842.50$7,792.21$7,792.21]$6,150.00$6,150.00$25,000.00$25,000.00$7,000.00$7,000.00$3,800.00$3,800.00
12 ClassARipRap 10 TON $151.30$1,513.00$779.22$7,792.20]$425.00$4,250.00$112.00i $1,120.00$110.00$1,100.00$380.00$3,800.00
TOTAL,BASEBID $698,713.85 $894,479.00] $824,097.00 i $628,678.00 $1,023,875.00 $880,635.00
JFWaz.
£g§g$§§THELANDPLANGROUPSOUTH
Wfwv‘l}LandscapeArchitecture
3-!\Jig-i\i
i EngineeringiPlanning%
To: CystalWaldrop Date:11.12.2026
NewberryCounty
/} / J/
i
f’'i’!Re: RecommendationofAward / f{IfWhitmireSidewalk
CDBG#4-CE-22-09
NewberryCo.,SC
From:CharlesHowellJr.,R ,ASLA
OnThursday,October29,2026,sixbidswerereceivedfortheabovereferencedproject.We
havecontactedLLR,andtheBBBandthelowestbidderwasnotpropertylicenseandhadbid
errors.WehavereviewedtherestofthebidsandthesecondIowestbidder’sreferences,and
theywerefoundtoberesponsiveandproperlylicensed.Theirbidwasinlinewithcurrent
marketconditionswhencomparedtosimilarprojects.
TheLandPlanGroupSouthrecommendsawardtothelowest,qualifiedlocalresponsivebidder,
ARConstructionofDuncan,SC,inthebaseamountof$628,678.00.
Pleasecontactmeifyouhavequestionsorifyouneedadditionalinformation.
1206ScottStreet
Columbia,SC29201
O:803.256.0562
www.landplansouth.com
/[
/
/
Source: Newberry County website. First collected Nov 19, 2026.