PAGE 1 OF 7 STATE OF SOUTH CAROLINA COUNTY OF OCONEE ORDINANCE 2024-25 AN ORDINANCE AUTHORIZING, PURSUANT TO TITLE 12, CHAPTER 44 OF THE CODE OF LAWS OF SOUTH CAROLINA 1976, AS AMENDED, THE EXECUTION AND DELIVERY OF A FEE-IN-LIEU OF AD VALOREM TAXES AND SPECIAL SOURCE REVENUE CREDIT AGREEMENT BY AND BETWEEN OCONEE COUNTY, SOUTH CAROLINA, AND PROJECT SHAKER, ACTING FOR ITSELF, ONE OR MORE CURRENT OR FUTURE AFFILIATES AND OTHER PROJECT COMPANIES (COLLECTIVELY, “COMPANY”); PROVIDING FOR A FEE-IN-LIEU OF AD VALOREM TAXES INCENTIVE; PROVIDING FOR A SPECIAL SOURCE REVENUE CREDIT; DEVELOPING A JOINT COUNTY INDUSTRIAL AND BUSINESS PARK BETWEEN OCONEE COUNTY AND PICKENS COUNTY SO AS TO DESIGNATE THE PROPERTY OF THE PROJECT AS PART OF A MULTI -COUNTY INDUSTRIAL PARK; AND OTHER RELATED MATTERS. WHEREAS, Oconee County, South Carolina ( “County”), acting by and through its County Council (“Council”), is authorized and empowered, under and pursuant to the provisions of the Code of Laws of South Carolina 1976, as amended through the date hereof (“Code”), particularly Title 12, Chapter 44 thereof (“Negotiated FILOT Act”) and Title 4, Chapter 1 of the Code ( “Multi-County Park Act” or, as to Section 4-1-175 thereof, and, by incorporation, Section 4- 29-68 of the Code, “Special Source Act”) (collectively, “Act”), and by Article VIII, Section 13 of the South Carolina Constitution: (i) to enter into agreements with investors to establish projects through which the economic development of the State of South Carolina (“State”) will be promoted and trade developed, thus utilizing and employing the manpower, agricultural products, and natural resources of the State; (ii) to covenant with those investors to accept certain fee in lieu of ad valorem tax (“FILOT”) payments, including, but not limited to, negotiated FILOT (“Negotiated FILOT”) payments , and gra nting certain special source revenue credits ( “SSRCs”) to pay costs of designing, acquiring, constructing improving or expanding (i) infrastructure serving a project or the County, and (ii) for improved or unimproved real estate and personal property including machinery and equipment used in the operating of a manufacturing or commercial enterprise ( “Infrastructure”); and (iii) to create or expand, in conjunction with one or more other counties, a multi-county industrial or business park to allow such special source revenue credits and certain enhanced income tax credits to those investors; WHEREAS, the County has caused to be prepared and presented to the Council the form of an agreement (“MCIP Agreement”) for Development of a Joint County Industrial Park (Project Shaker ) by and between the County and Pickens County (“Park”), the substantially final form of which is attached as Exhibit C , pursuant to which certain real property consisting of approximately [●] acres, as fur ther described on the attached Exhibit A (“Project Site”) shall be designated as being part of the Park upon the approval of this Ordinance by the Council and the approval of a separate ordinance by the Pickens County Council; WHEREAS, the property located in the Park is exempt from ad valorem taxation and the owners of that property pay a non-negotiated fee in lieu of tax payment in the absence of a Negotiated FILOT (“Non- Negotiated FILOT”); WHEREAS, the County, acting by and through its Council, is further authorized and empowered under and pursuant to the provisions of the Multi-County Park Act to provide for payments-in-lieu of taxes with respect to property located in a multi -county business or industrial park created under the Multi-County Park Act and to create, in conjunction with one or more other counties, a multi-county park to afford certain enhanced tax credits to those investors; PAGE 2 OF 7 WHEREAS, [●], formerly known to the County as Project Shaker, acting for itself, one or more current or future affiliates and other project sponsors (collectively, “Company”) proposes to invest in, or cause others to invest in, the establishment or expansion of a manufacturing facility in the County (“Project”), which the Company expects will result in the investment of approximately $12,650,000 in taxable property and the creation of approximately 41 new, full-time equivalent jobs; WHEREAS, the Project Site, upon the approval of this Ordinance by the Council and the approval of a separate ordinance by the Pickens County Council, is added to and will be located within the boundaries of the Park; WHEREAS, pursuant to an Inducement Resolution adopted by the Council on October 15, 2024, the County identified the Project as a “project” as provided in the Act and gave preliminary approval to certain incentives; WHEREAS, the Company has caused to be prepared and presented to this meeting the form of the Fee in Lieu of Ad Valorem Taxes and Special Source Revenue Credit Agreement, attached as Exhibit B, by and between the County and the Company (“Fee Agreement”), which provides for (i) fee in lieu of tax payments utilizing a 6% assessment ratio for a period of 30 years for the Project or each component thereof placed in service during the investment period as provided according to the Act; and (ii) a fifty percent (50%) SSRC with a term of 7 years with respect to the Negotiated FILOT payments; and WHEREAS, it appears that the Fee Agreement , and the MCIP Agreement , each of which are now before this meeting, are in appropriate form and are each an appropriate instrument to be executed and delivered by the County for the purposes intended. NOW, THEREFORE, BE IT ORDAINED by the Council, as follows: Section 1. Statutory Findings. Based solely on information provided to the County by the Company, it is hereby found, determined, and declared by the County Council, as follows: (a) The Project will constitute a “project” as that term is referred to and defined in the Act, and the County’s actions herein will subserve the purposes and in all respects conform to the provisions and requirements of the Act; (b) The Project and the payments in lieu of taxes set forth herein are beneficial to the County, and the County has evaluated the Project based on all criteria prescribed by law, including the anticipated dollar amount and nature of the i nvestment to be made and the anticipated costs and benefits to the County; (c) The Project is anticipated to benefit the general public welfare of the County by providing services, employment, recreation, or other public benefits not otherwise adequately provi ded locally; (d) The Project gives rise to no pecuniary liability of the County or any incorporated municipality or a charge against the general credit or taxing power of either; (e) The purposes to be accomplished by the Project, i.e., economic development, creat ion of jobs, and addition to the tax base of the County, are proper governmental and public purposes; (f) The inducement of the location or expansion of the Project within the County and State is of paramount importance; and (g) The anticipated benefits of the Project to the public will be greater than the costs. Section 2. Multi-County Park . The County intends to use its commercially reasonable efforts to designate the Project and the Project Site as part of the Park or a separate multi-county industrial or business park, if not already so designated, and intends to use its commercially reasonable efforts to maintain the PAGE 3 OF 7 Project and the Project Site within the boundaries of a multi-county industrial or business park pursuant to the provisions of the Multi -County Park Act and Article VIII, Section 13(D) of the State Constitution on terms which provide, for all jobs created at the Project through the end of the investment period set forth in the MCIP Agreement, any additional job tax credits afforded by the laws of the State for projects located within multi-county industrial or business parks, and on terms, and for a duration, which facilitate the special source revenue credits set forth in the recitals of this Ordinance. Sharing of expenses and revenues of the County and Pickens County shall be as set forth in the MCIP Agreement (or applicable agreement related to any subsequent multi-county industrial or business park). Section 3. Authorization of an A pproval of Form of Fee Agreemen t, and MCIP Agreement. To promote industry, develop trade, and utilize and employ the manpower, products, and natural resources of the State by assisting the Company to expand or locate a manufacturing facility in the State, the Fee Agreement, and the MCIP Agreement are each authorized and approved. The form of the Fee Agreement, and the MCIP Agreement presented at this meeting, respectively, as attached as Exhibit B, and Exhibit C, are each approved, and all of the terms of each are incorporated in this Ordinance by reference as if the Fee Agreement, and the MCIP Agreement were set out in this Ordinance in their entirety. The Chairman of the County Council, and the Clerk to County Council are each authorized, empowered, and directed to execute, acknowledge, and deliver the Fee Agreement , and the MCIP Agreement in the name of and on behalf of the County, and to cause the executed Fee Agreement to be delivered to the Company and the executed MCIP Agreement to be delivered to Pickens County. The Fee Agreement, and the MCIP Agreement are in substantially the form now before this meeting, with such changes therein as shall not be materially adverse to the County and as shall be approved by the officials of the County executing the same, on the advice of Counsel to the County, such official’s execution thereof to constitute conclusive evidence of such official’s approval of any and all changes or revi sions therein from the form of the Fee Agreement , and the MCIP Agreement now before this meeting. Section 4. Authorization for County Officials to Act. The Chairman of the County Council, the Clerk to County Council, and the County Administrator, for and on behalf of the County, are each authorized and directed to do each thing that is reasonably necessary and prudent to effect the execution and delivery of the Fee Agreement, and the MCIP Agreement and the performance of all obligations of the County under and pursuant to this Ordinance and Fee Agreement, and the MCIP Agreement. Section 5. General Repealer. Each order, resolution, ordinance, or part of the same in conflict with this Ordinance, is, to the extent of that conflict, repealed. Section 6. Effective Date. This Ordinance is effective at its approval following a public hearing and third reading. [ONE SIGNATURE PAGE AND [] EXHIBITS FOLLOW] [REMAINDER OF PAGE INTENTIONALLY BLANK] PAGE 4 OF 7 Passed and approved: December ____, 2024 OCONEE COUNTY, SOUTH CAROLINA By: Matthew Durham, Chairman Oconee County Council [SEAL] ATTEST: By: Jennifer C. Adams, Clerk to Council Oconee County Council First Reading: October 15, 2024 Second Reading: November 04, 2024 Public Hearing: December 06, 2024 Third Reading: December 06, 2024 PAGE 5 OF 7 EXHIBIT A DESCRIPTION OF PROJECT SHAKER PROPERTY ALL that certain piece, parcel, or tract of land situate in Oconee County, South Carolina and being shown [●] [●] [●]. Said parcel being more fully described as follows: [●] [●] [●]. PAGE 6 OF 7 EXHIBIT B FORM OF FEE IN-LIEU OF AD VALOREM TAXES AND SPECIAL SOURCE REVENUE CREDIT AGREEMENT [SEE ATTACHED] PAGE 7 OF 7 EXHIBIT C FORM OF MCIP AGREEMENT [SEE ATTACHED] FEE-IN-LIEU OF AD VALOREM TAXES AND SPECIAL SOURCE REVENUE CREDIT AGREEMENT Between OCONEE COUNTY, SOUTH CAROLINA and [PROJECT SHAKER] Dated as of [_________], 2024 RECAPITULATION OF CONTENTS OF FEE AGREEMENT PURSUANT TO S.C. CODE §12-44-55(A) The parties have agreed to waive this requirement pursuant to S.C. Code Ann. § 12-44-55(B). 1 FEE-IN-LIEU OF AD VALOREM TAXES AND SPECIAL SOURCE REVENUE CREDIT AGREEMENT THIS FEE-IN-LIEU OF AD VALOREM TAXES AND SPECIAL SOURCE REVENUE CREDIT AGREEMENT (the “Fee Agreement”) is made and entered into as of [___], 2024 by and between OCONEE COUNTY, SOUTH CAROLINA (the “County”), a body politic and corporate and a political subdivision of the State of South Carolina (the “State”), acting by and through the Oconee County Council (the “County Council”) as the governing body of the County, and [PROJECT SHAKER], (FORMERLY IDENTIFIED AS PROJECT SHAKER), a corporation organized and existing under the laws of the State of South Carolina (the “Company”). RECITALS 1. Title 12, Chapter 44, Code of Laws of South Carolina, 1976, as amended (the “Act”) authorizes the County (i) to induce industries to locate in the State; (ii) to encourage industries now located in the State to expand their investments and thus make use of and employ manpower, products, and other resources of the State; and (iii) to enter into a fee agreement with entities meeting the requirements of such Act, which identifies certain property of such entities as economic development property. 2. Pursuant to Section 12-44-40(I)(1) of the Act, based solely on the information provided to the County by the Company, the County finds that: (a) the Project (as defined herein) is anticipated to benefit the general public welfare of the County by providing services, em ployment, recreation, or other public benefits not otherwise adequately provided locally; (b) the Project gives rise to no pecuniary liability of the County or any incorporated municipality and to no charge against its general credit or taxing power; (c) the purposes to be accomplished by the Project are proper governmental and public purposes; and (d) the benefits of the Project are greater than the costs. 3. Based solely on information provided to the County by the Company, the County has evaluated the Project based on all relevant criteria that include, but are not limited to, the purposes the Project is to accomplish, the anticipated dollar amount and nature of the investment, and the anticipated costs and benefits to the County. 4. An Ordinance that the Count y Council enacted contemporaneously with the date of this Fee Agreement (the “Fee Ordinance”) authorizes the County and the Company to enter into a Fee Agreement that classifies the Project as Economic Development Property under the Act and provides for the payment of fees in lieu of taxes, all as further described herein. NOW, THEREFORE, FOR AND IN CONSIDERATION of the respective representations and agreements hereinafter contained, the parties hereto agree as follows: ARTICLE I DEFINITIONS Section 1.1 The terms that this sec tion defines shall for all purposes of this Fee Agreement have the meanings herein specified, unless the context clearly requires otherwise: 2 “Act” shall mean Title 12, Chapter 44, Code of Laws of South Carolina, 1976, as amended, and all future acts successor or supplemental thereto or amendatory thereof. “Act Minimum Investment Requirement” shall mean an investment of at least $2,500,000 by the Company and any Sponsors and sponsor affiliates of property within the Investment Period , provided, however, that in the event of a reduction of the minimum investment level in Section 12-44-30(14) or any successor section by legislative action, then the Act Minimum Investment Requirement shall equal such reduced amount. “Clawback Minimum Requirements” shall mean (a) an investment of at least [ $12,650,000] in property subject to ad valorem taxation (in the absence of this Fee Agreement and/or the Industrial Development Park) by the Company and any Sponsors and (b) the creation of at least [ 41 new], full-time jobs by the Company. “Commencement Date” shall mean the last day of the property tax year during which the Project or the first Phase thereof is placed in service, which date must not be later than the last day of the property tax year which is three years from the year in which the County and the Company enter into this Fee Agreement. “Company” shall mean [Project Shaker] (formerly identified as Project Shaker) and any surviving, resulting, or transferee entity in any merger, consolidation, or transfer of assets; or any other person or entity which may succeed to the rights and duties of the Company. “County” shall mean Oconee County, South Carolina, a body politic and corporate and a political subdivision of the State of South Carolina, its successors, and assigns, acting by and through the County Council as the governing body of the County. “County Council” shall mean the Oconee County Council, the governing body of the County. “Department” or “SCDOR” shall mean the South Carolina Department of Revenue. “Diminution in Value” in respect of the Project or any Phase of the Project shall mean any reduction in the value using the original fair market value (without regard to depreciation) as determined in Step 1 of Section 4.1(a) of this Fee Agreement, of the items which constitute a part of the Project or such Phase and which are subject to FILOT payments which may be caused by (i) the Company’s removal and/or disposal of equipment pursuant to Section 4.6 of this Fee Agreement; (ii) a casualty to the Project, such Phase of the Project, or any part thereof, described in Section 4.7 of this Fee Agreement; or (iii) a condemnation of the Project, such Phase of the Project, or any part thereof, described in Section 4.8 of this Fee Agreement. “Economic Development Property” shall mean those items of real and tangible personal property of the Project which are eligible for inclusion as economic development property under the Act, selected and identified by the Company in its annual filing of a SCDOR PT -300S or comparab le form with the Department (as such filing may be amended from time to time) for each year within the Investment Period. “Equipment” shall mean all of the machinery, equipment, furniture, office equipment, and fixtures, together with any and all additions, accessions, replacements, and substitutions thereto or therefor used or to be used in the County by the Company for the purposes described in Section 2.2(b) hereof, provided, however, that repairs, alterations, or modifications to personal property which is not economic development property or property subject to a fee in lieu of taxes prior to this Fee Agreement, are not eligible to become Economic Development Property, except for modifications which constitute an expansion of existing real property improvements. “Event of Default” shall mean any event of default specified in Section 5.1 of this Fee Agreement. 3 “Exemption Period” shall mean the period beginning on the first day of the property tax year after the property tax year in which an applicable piece of Economic Development Property is placed in service and ending on the Termination Date. In case there are Phases of the Project, the Exemption Period applies to each year’s investment made during the Investment Period. “Fee,” “Fee in Lieu of Taxes,” “FILOT,” or “Payments in Lieu of Taxes” shall mean the amount paid or to be paid in lieu of ad valorem property taxes as provided herein. “Fee Agreement” shall mean this Fee Agreement. “Fee Term” shall mean the period from the date of this Fee Agreement until the Termination Date. “Improvements” shall mean all improvements to the Real Property, including buildings, building additions, roads, sewer lines, and infrastructure, together with any and all additions, fixtures, accessions, replacements, and substitutions thereto or therefor used or to be used in the County for the purposes described in Section 2.2(b) hereof; provided, however, that repairs, alterations, or modifications to real property which is not economic development property or property subject to a fee in lieu of taxes prior to this Fee Agreement, are not eligible to become Economic Development Property, except for modifications which constitute an expansion of exis ting real property improvements and except as otherwise permitted by Section 12-44-110 of the Act. “Industrial Development Park” shall mean an industrial or business park created pursuant to the MCIP Act. “Infrastructure” shall mean infrastructure serving the Project, including the Improvements, to the extent that the MCIP Act permits, provided that Infrastructure shall first be deemed to include real property and infrastructure improvements prior to including any personal property, notwithstanding any presumptions to the contrary in the Act or otherwise. “Infrastructure Credit” shall mean the annual infrastructure credit provided to the Company pursuant to the MCIP Act and Section 4.1(c) hereof, with respect to the Infrastructure. “Investment Commitment” shall mean, with respect to the Project, investment by the Company and any sponsor affiliates of at least $12,650,000 in Economic Development Property subject (non-exempt) to ad valorem taxation (in the absence of this Fee Agreement). “Investment Period” shall mean the period beginning with the first day of any purcha se or acquisition of Economic Development Property and ending five years after the Commencement Date, provided that the Company and the County may agree to a later date pursuant to Section 12- 44-30(13) of the Act. “Jobs Achievement Percentage” shall equal the quotient of the maximum number of jobs created in the Investment period divided by forty-one (41). “Jobs Commitment” shall mean the creation of at least forty -one (41) new, full -time jobs at the Project. “MCIP Act” shall mean Article VIII, Section 13 (D) of the Constitution of the State of South Carolina, Sections 4-1-170, 4-1-172, and 4-1-175 of the Code of Laws of South Carolina, 1976, as amended, and Section 4-29-68 of the Code of Laws of South Carolina, 1976, as amended. “Phase” or “Phases” in respect of the Project shall mean that the Equipment, Improvements, and/or Real Property of the Project are placed in service during more than one year in the Investment Period, and the word “Phase” shall therefore refer to the applicable portion of the Pr oject placed in service in a given year in the Investment Period. 4 “Project” shall mean all the Equipment, Improvements, and/or Real Property in the County that the Company determines to be necessary, suitable, or useful for the purposes that Section 2.2(b) describes, and first placed in service in calendar year 2024 or thereafter. The Project shall not include existing buildings and improvements on the Real Property, as of the date of the commencement of the Project by the Company, and any machinery and equipment which have previously been subject to South Carolina ad valorem taxation, except as expressly permitted by Section 12-44-110 of the Act. “Real Property” shall mean real property that the Company uses or will use in the County for the purposes that Section 2.2(b) describes, and initially consisting of the land identified on Exhibit A hereto, together with all and singular the rights, members, hereditaments, and appurtenances belonging or in any way incident or appertaining thereto, and any improvements located thereon. “Removed Components” shall mean the following types of components or Phases of the Project or portions thereof which are subject to FILOT payments, all of which the Company shall be entitled to remove from the Project with the result that the same shall no longer be subject to the terms of the Fee Agreement: (a) components or Phases of the Project or portions thereof which the Company, in its sole discretion, determines to be inadequate, obsolete, worn- out, uneconomic, damaged, unsuitable , undesirable, or unnecessary pursuant to Section 4.6 hereof or otherwise; or (b) components or Phases of the Project or portions thereof which the Company in its sole discretion, elects to be treated as removed pursuant to Section 4.7(c) or Section 4.8(b)(iii) of this Fee Agreement. “Replacement Property” shall mean any property which is placed in service as a replacement for any item of Equipment, any Improvement, or any Real Property previously subject to this Fee Agreement regardless of whether such property serves the same functions as the property it is replacing and regardless of whether more than one piece of property replaces any item of Equipment, any Improvement, or any Real Property, to the fullest extent that the Act permits. “Sponsor” shall mean an entity that joins with or is an affiliate of, the Company and that participates in the investment in, or financing of, the Project and which meets the requirements under the Act to be entitled to the benefits of this Fee Agreement w ith respect to its participation in the Project. Any Sponsor joining in the investment at the Project will be effective on delivery of a Joinder Agreement, the form of which is attached as Exhibit B , executed by the Company and the Sponsor, and consented to by the County, as reflected by its execution of the Joinder Agreement. “Streamlined FILOT Act” shall mean Title 4, Chapter 12 of the Code of Laws of South Carolina, 1976, as amended. “Termination Date” shall mean in case the entire Project is placed in service in one year, the end of the last day of the property tax year which is the 29th year following the first property tax year in which the entire Project is placed in service, or in case there are Phases of the Project, the Termination Date shall mean with respect to each Phase of the Project the end of the last day of the property tax year which is the 29th year following the first property tax year in which such Phase of the Project is placed in service, provided, that the intention of the parties is that the Company will make at least 30 annual FILOT payments under Article IV hereof with respect to each Phase of the Project and provided further, that if this Fee Agreement is terminated earlier in accordance with the terms hereof, the Termin ation Date is the date of such termination. Section 1.2 Any reference to any agreement or document in this Article I or otherwise in this Fee Agreement shall include any and all amendments, supplements, addenda, and modifications to such agreement or document. Section 1.3 The ter m “investment” or “invest” as used herein shall include not only investments made by the Company or a Sponsor , but also to the fullest extent permitted by law, those investments made by or for the benefit of the Company in connection with the Project through federal, state, 5 or local grants, to the extent such investments are subject to ad valorem taxes or FILOT payments by the Company. ARTICLE II REPRESENTATIONS, WARRANTIES, AND AGREEMENTS Section 2.1 Representations, Warranties, and Agreements of the County . The County hereby represents, warrants, and agrees as follows: (a) The County is a body politic and corporate and a political subdivision of the State and acts through the County Council as its governing body. The Act authorizes and empowers the County to enter into the transac tions that this Fee Agreement contemplates and to carry out its obligations hereunder. The County has duly authorized the execution and delivery of this Fee Agreement and any and all other agreements described herein or therein and has obtained all consents from third parties and taken all actions necessary or that the law requires to fulfill its obligations hereunder. (b) Based solely on representations by the Company, the Project constitutes a “project” within the meaning of the Act, and the County is a Count y that the Act authorizes to enter into fee in lieu of tax agreements with companies that satisfy the Act Minimum Investment Requirement within the County. (c) The County has agreed that each item of real and tangible personal property comprising the Project which is eligible to be economic development property under the Act and that the Company selects shall be considered Economic Development Property and is thereby exempt from ad valorem taxation in South Carolina. (d) The millage rate in Section 4.1 hereof is the lowest millage rate permissible under the Act, which the parties understand to be 214.9 mills, the millage rate in effect with respect to the location of the proposed Project on June 30, 2024, as provided under Section 12-44-50(A)(1)(d) of the Act. (e) The County will not be in default in any of its obligations (contractual or otherwise), including any violation of its statutory debt limit, as a result of entering into and performing under this Fee Agreement and/or as a result of creating an Industrial Development Park encompassing the Project. (f) The County agrees to use its commercially reasonable efforts to cause the Real Property to be added to and become part of the Multi-County Park, and the County will diligently take all reasonable acts to ensure that the Project will continuously be included with the boundaries of the Multi - County Park or another multi -county park during the Fee Term in order that the tax benefits afforded by the laws of the State of South Carolina for projects in the County located within multi- county industrial parks will be available to the Sponsor. Section 2.2 Representations, Warranties, and Agreements of the Company . The Company hereby represents, warrants, and agrees as follows: (a) The Company is in good standing under the laws of the State of South Carolina, is duly authorized to transact business in the State of South Carolina, has power to enter into this Fee Agreement, and has duly authorized the execution and delivery of this Fee Agreement. (b) The Company intends to operate the Project as a “project” within the meaning of the Act as in effect on the date hereof. The Company intends to operate the Project for the purpose of manufacturing, and for such other purposes that the Act permits as the Company may deem appropriate. 6 (c) The Company will use commercially reasonable efforts to ensure that its total capital investment will equal or exceed the Act Minimum Investment Requirement. (d) The Company’s execution and delivery of this Fee Agreement and its compliance with the provisions hereof will not result in any material default, not waived, or cured, under any company restriction or any material agreement or instrument to which the Company is now a party or by which it is bound. (e) The Company intends to operate the Project as a “project” within the meanin g of the Act as in effect on the date hereof. The Company intends to develop, construct, install and operate, as applicable, certain facilities on the Real Property to conduct its distribution and/or manufacturing facility, and any other legal activities and functions with respect thereto, and for such other purposes permitted under the Act as the Company may deem appropriate. (f) The availability of the payment in lieu of taxes regarding the Economic Development Property authorized by the Act has, together wit h other incentives offered, induced the Company to undertake the Project in the County. (g) The Company plans and intends t o achieve its Investment Commitment and Jobs Commitment by the end of the Investment Period. (h) The income tax year of the Company, and accordingly the property tax year, for federal income tax purposes, ends on March 31. (i) The Company has retained legal counsel to confirm or has had a reasonable opportunity to consult legal counsel to confirm, its eligibility for the FILOT and other incentives granted by this Fee Agreement and has not relied on the County, its officials, employees, or legal representatives with respect to any question of eligibility or applicability of the FILOT and other incentives granted by this Fee Agreement. ARTICLE III COMMENCEMENT AND COMPLETION OF THE PROJECT Section 3.1 The Project. The Company intends to invest in Equipment, Improvements, and/or Real Property, which together comprise the Project and which are anticipated to create at least the Act Minimum Investment Requirement in eligible Economic Development Property investment subject to Payments in Lieu of Taxes in the County. The parties hereto agree that, to the extent that applicable law allows or is revised or construed to allow the benefits of the Act, in the form of FILOT Payments to be made under Article IV hereof, to be applicable to leased assets including, but not limited to a building and/or personal property to be installed in the buildings and leased to but not purchased by the Company from one or more Sponsors under any form of lease, then such property shall, at the election of the Company, be subject to FILOT Payments to the same extent as the Company’s assets covered by this F ee Agreement, subject, at all times, to the requirement of such applicable law. The parties hereto further agree that this Fee Agreement may be interpreted or modified as may be necessary or appropriate in order to give proper application of this Fee Agreement to such tangible property without such construction or modification constituting an amendment to this Fee Agreement, and thus not requiring any additional action by the County Council. The County Administrator, after consulting with the County Attorne y, shall be and hereby is authorized to make such modifications, if any, as may be necessary or appropriate in connection therewith. Such leased property shall constitute a part of the Project for all purposes of this Fee Agreement, including the calculation of the Clawback Minimum Requirements, removal, replacement, and termination, and such Sponsor shall be deemed to be a party to this Fee Agreement provided, however, that no Sponsor shall be liable for any payments pursuant to Section 4.2(b) hereof, which shall remain the Company’s liability. 7 Pursuant to the Act and subject to Section 4.2 hereof, the Company and the County hereby agree that the Company shall identify annually those assets which are eligible for FILOT payments under the Act and which the Company selects for such treatment by listing s uch assets on the applicable schedule in its annual PT-300 form (or comparable form) to be filed with the Department (as such may be amended from time to time) and that by listing such assets, such assets shall automatically become Economic Development Property and therefore be exempt from all ad valorem taxation during the Exemption Period, subject to provisions of the Act, and Article V, hereof, and provided, however, the Company makes FILOT payments, as, if, and when due under the Act and this Fee Agreement . Anything contained in this Fee Agreement to the contrary notwithstanding, the Company shall not be obligated to complete the acquisition of the Project. However, if the Company does not meet the Act Minimum Investment Requirement, this Fee Agreement shall be terminated as provided in Section 4.2 hereof. Section 3.2 Diligent Completion. The Company agrees to use its reasonable efforts to cause the completion of the Project as soon as practicable, but in any event on or prior to the end of the Investment Period. Section 3.3 Filings and Reports. (a) Each year during the term of the Fee Agreement, the Company shall deliver to the County, the County Auditor, the County Treasurer, the County Assessor, and the County Treasurer, a copy of its most recent annual filings with the Department with respect to the Project, not later than 30 days following delivery thereof to the Department. (b) The Company shall cause a copy of this Fee Agreement, as well as a copy of the completed Form PT-443 of the Department, to be filed with the County Auditor, the County Treasurer, and the County Assessor of the County and any partner county, when the Project is placed in an Industrial Development Park, and the Department within 30 days after the date of execution and delivery hereof by all parties hereto. ARTICLE IV PAYMENTS IN LIEU OF TAXES Section 4.1 Negotiated Payments. (a) Pursuant to Section 12- 44-50 of the Act, the Company is required to make payments in lieu of ad valorem taxes to the County with respect to the Economic Development Property. Inasmuch as the Company anticipates an initial investment of sums sufficient for the Project to qualify for a fee in lieu of tax arrangement under the Act, the County and the Company have negotiated the amount of the FILOT Payments in accordance therewith. The Company shall make FILOT Payments on all Economic Development Property which comprises the Project and is placed in service, as follows: the Company shall make FILOT Payments during the Exemption Period with respect to the Economic Development Property or, if there are Phases of the Economic Development Property, with respect to each Phase of the Economic Development Property, said payments to be made annually and to be due and payable and subject to penalty assessments on the same dates and in the same manner as prescribed by the County for ad valorem taxes. The determination of the amount of such annual FILOT Payments shall be in accordance with the following procedure (subject, in any event, to the procedures that the Act requires): Step 1: Determine the fair market value of the Economic Development Property (or Phase of the Economic Development Property) placed in service during the Exemption Period using original income tax basis for State income tax purposes for any Real Property and Improvements without regard to depreciation (provided, the fair market value of real property, as the Act defines such term, that the Company obtains by construction or purchase in an arms-length transaction is equal to t he original income tax basis, and 8 otherwise, the determination of the fair market value is by appraisal) and original income tax basis for State income tax purposes for any personal property less depreciation for each year allowable for property tax purpos es, except that no extraordinary obsolescence shall be allowable. The fair market value of the Real Property for the first year of the Fee Term remains the fair market value of the Real Property for the life of the Fee Term. The determination of these valu es shall take into account all applicable property tax exemptions that State law would allow to the Company if the property were taxable, except those exemptions that Section 12 -44-50(A)(2) of the Act specifically disallows. Step 2: Apply an assessment ratio of six percent (6%) to the fair market value in Step 1 to establish the taxable value of the Economic Development Property (or each Phase of the Economic Development Property) in the year it is placed in service and in each of the 29 years thereafter or such longer period of years in which the Act permits the Company to make annual fee payments. Step 3: Use a fixed millage rate equal to the lowest millage rate permissible under the Act, which the parties mutually understand to be the millage rate in effe ct on June 30, 2023, which is 214.9 mills, as Section 12-44-50(A)(1)(d) of the Act provides, during the Exemption Period against the taxable value to determine the amount of the Payments in Lieu of Taxes due during the Exemption Period on the payment dates that the County prescribes for such payments or such longer period of years in which the Act permits the Company to make annual fee payments. (b) The FILOT Payments shall be in lieu of all ad valorem tax payments and any other charges that would have appeared on the property tax bills otherwise generated by the County in the absence of this Fee Agreement. In the event that a final order of a court of competent jurisdiction or an agreement of the parties determines that the calculation of the minimum FILOT Payment applicable to this transaction is to be other than by the procedure herein, the payment shall be reset at the minimum permitted level so determined. Subject to Section 6.8 hereof, in the event that a final order of a court of competent jurisdiction from which no further appeal is allowable declares the Act and/or the herein -described Payments in Lieu of Taxes invalid or unenforceable, in whole or in part, for any reason, the parties express their intentions to reform such payments so as to effectuate m ost closely the intent hereof and so as to afford the Company with the benefits to be derived herefrom, the intention of the County being to offer the Company a strong inducement to locate the Project in the County. If the Economic Development Property is deemed to be subject to ad valorem taxation, this Fee Agreement shall terminate, and the Company shall pay the County regular ad valorem taxes from the date of termination, but with appropriate reductions equivalent to all tax exemptions which are afforded to the Company. Any amount determined to be due and owing to the County from the Company, with respect to a year or years for which the Company previously remitted Payments in Lieu of Taxes to the County hereunder, shall (i) take into account all applicable tax exemptions to which the Company would be entitled if the Economic Development Property was not and had not been Economic Development Property under the Act; and (ii) be reduced by the total amount of Payments in Lieu of Taxes the Company had made with respect to the Project pursuant to the terms hereof. Notwithstanding anything contained herein to the contrary, neither the Company nor any successor in title or interest shall be required to pay FILOT payments and ad valorem taxes for the same property over the same period in question. (c) The County agrees that all qualifying capital expenses of the Company during the Investment Period shall qualify for a seven-year, 50% Infrastructure Credit. The Company shall receive an annual credit in an amount equal t o 50% of the FILOT revenues for the Project to offset the aggregate 9 Infrastructure costs incurred for the first seven FILOT Payments hereunder. The Infrastructure Credit shall be applied as a setoff against the FILOT owed for the then current year. To claim each Infrastructure Credit, the Sponsor shall file with the County Administrator, the County Auditor, and the County Treasurer, no later than the date on which the FILOT Payment is due in each year in which the Sponsor is entitled to claim a n Infrast ructure Credit, an Annual Infrastructure Credit Certificate, the form of which is attached as Exhibit C (the “Certification”), showing the amount of aggregate investment in qualifying infrastructure and the calculation of the Infrastructure Credit. Failure to timely file the Certification shall not result in a forfeiture of the Infrastructure Credit for such year, but the County will not deduct the Infrastructure Credit from the FILOT bill until the Certification is submitted by the Sponsor, provided, further, however, failure to file the Certification on or before the close of the County’s then-current fiscal year shall result in the forfeiture of the Infrastructure Credit for such year. The County is entitled to confirm the information (including the calcu lation) on the Certification prior to deducting the amount of the Infrastructure Credit from the FILOT payment due by the Sponsor on the FILOT bill. If the information contained on the Certification is correct, then the County shall deduct the Infrastructure Credit amount from the FILOT bill. In no event is the County required to deduct any Infrastructure Credit amount from the FILOT bill while any of the Sponsor’s taxes or FILOT Payments have been invoiced by the County but remain outstanding, including for any taxes or FILOT Payments that may have been protested by the Sponsor. Section 4.2 Failure to Achieve Act Minimum Investment Requirement ; Failure to Achieve Clawback Minimum Requirements. (a) In the event that the cost of the Economic Development Property (without regard to depreciation) that the Company acquires does not reach the Act Minimum Investment Requirement by the end of the Investment Period, this Fee Agreement shall terminate as to such entity failing to meet the minimum investment level. In such event, the Company shall pay the County an amount (the “Additional Payment”) pursuant to the Act which is equal to the excess, if any, of (i) the total amount of ad valorem taxes as would result from taxes levied on the Project by the County, municipality or municipalities, school district or school districts, and other political units as if the items of property comprising the Economic Development Property were not Economic Development Property, but with appropriate reductions equivalent to all tax exempt ions and abatements to which the Company would be entitled in such a case, through and including the end of the Investment Period, over (ii) the total amount of FILOT payments the Company has made with respect to the Economic Development Property through and including the end of the Investment Period. Any amounts determined to be owing pursuant to the foregoing sentence shall be subject to the minimum amount of interest that the Act may require. (b) If the Company fails to achieve the Clawback Minimum Requirements by the end of the Investment Period, the Infrastructure Credits shall be reduced retroactively and prospectively, as follows: Reduction Factor = 100% - Overall Achievement Percentage Overall Achievement Percentage = (Investment Achievement Percentage + Jobs Achievement Percentage) / 2 Investment Achievement Percentage = Maximum Capital Investment Achieved Within the Investment Period / $12,650,000 Jobs Achievement Percentage = Maximum Jobs Created Within the Investment Period / 41 Repayment Amount = Infrastructure Credits Received x Reduction Factor The Company shall pay the Repayment Amount within 60 days after the deadline for filing property tax returns for the last year of the Investment Period. Any future Infrastructure Credits shall be reduced by the 10 Reduction Factor, provided that either the Company or the County may request a redetermination of the Reduction Factor for any future Infrastructure Credits in any property tax year based on the capital investment and jobs achieved as of the last day of the Company’s applicable fiscal year , subject to the statutory interest if not paid when due pursuant to Section 12- 54-25 of the Code, and/or as otherwise allowed under the FILOT Act. (c) The remedies stated herein shall be the County’s sole remedies for the Company’s failure to meet any required investment or job creation level. Section 4.3 Payments in Lieu of Taxes on Replacement Property . If the Company elects to replace any Removed Components and to substitute such Removed Components with Replacement Property as a part of the Economic Development Property, or the Company otherwise utilizes Replacement Property, then, pursuant, and subject to Section 12- 44-60 of the Act, the Company shall make statutory payments in lieu of ad valorem taxes with regard to su ch Replacement Property in accordance with the following: (i) Replacement Property does not have to serve the same function as the Economic Development Property it is replacing. Replacement Property is deemed to replace the oldest Economic Development Property subject to the Fee, whether real or personal, which is disposed of in the same property tax year in which the Replacement Property is placed in service. Replacement Property qualifies as Economic Development Property only to the extent of the original income tax basis of Economic Development Property which is being disposed of in the same property tax year. More than one piece of property can replace a single piece of Economic Development Property. To the extent that the income tax basis of the Replacement Property exceeds the original income tax basis of the Economic Development Property which it is replacing, the excess amount is subject to annual payments calculated as if the exemption for Economic Development Property were not allowable. Replacement Property is entitled to treatment under the Fee Agreement for the period of time remaining during the Exemption Period for the Economic Development Property which it is replacing; and (ii) The new Replacement Property which qualifies for the Fee shall be recorded using its income tax basis, and the calculation of the Fee shall utilize the millage rate and assessment ratio in effect with regard to the original property subject to the Fee. Section 4.4 Reductions in Payments of Taxes Upon Removal, Condemnation, or Casualty . In the event of a Diminution in Value of the Economic Development Property or any Phase of the Economic Development Property, the Payment in Lieu of Taxes with regard to the Economic Development Property or that Phase of the Economic Development Property shall be reduced in the same proportion as the amount of such Diminution in Value bears to the original fair market value of the Economic Development Property or that Phase of the Economic Development Property as determined pursuant to Step 1 of Secti on 4.1(a) hereof; provided, however, that if at any time subsequent to the end of the Investment Period, the total value of the Project based on the original income tax basis of the Equipment, Real Property, and Improvements contained therein, without deduction for depreciation, is less than the Act Minimum Investment Requirement, beginning with the first payment thereafter due hereunder and continuing until the end of the Fee Term, the Company shall no longer be entitled to the incentive provided in Section 4.1, and the Company shall therefore commence to pay regular ad valorem taxes on the Economic Development Property part of the Project. However, the Company will not be required to make any retroactive payment such as the Additional Payment under Section 4.2. Section 4.5 Place of Payments in Lieu of Taxes. The Company shall make the above-described Payments in Lieu of Taxes directly to the County in accordance with applicable law. 11 Section 4.6 Removal of Economic Development Property. Subject, always, to the other terms and provisions hereof, the Company shall be entitled to remove and dispose of components or Phases of the Project from the Project in its sole discretion with the result that said components or Phases shall no longer be considered a part of the Project and, to the extent such constitute Economic Development Property, shall no longer be subject to the terms of this Fee Agreement to the fullest extent allowed by the Act, as amended. Economic Development Property is disposed of only when it is scrapped or sold, or it is removed from the Project. If it is removed from the Project, it is subject to ad valorem property taxes to the extent the Property remains in the State and is otherwise subject to ad valorem property taxes. Section 4.7 Damage or Destruction of Economic Development Property. (a) Election to Terminate . In the event the Economic Development Property is damaged by fire, explosion, or any other casualty, the Company shall be entitled to terminate this Fee Agreement. The Company shall only be required to make FILOT payments as to all or any part of the tax year in which the damage or casualty occurs to the extent property subject to ad valorem taxes would otherwise have been subject to such taxes under the same circumstances for the period in question. (b) Election to Rebuild. In the event the Economic Development Property is damaged by fire, explosion, or any other casualty, and if the Company does not elect to terminate this Fee Agreement, the Company may commence to restore the Economic Development Property with such reductions or enlargements in the scope of the Economic Development Property, changes, alterations, and modifications (including the substitution and addition of other property) as may be desired by the Company. All such restorations and replacements shall be consider ed, to the fullest extent permitted by law and this Fee Agreement, substitutions of the destroyed portions of the Economic Development Property and shall be considered part of the Economic Development Property for all purposes hereof, including, but not li mited to, any amounts due by the Company to the County under Section 4.1 hereof. (c) Election to Remove . In the event the Company elects not to terminate this Fee Agreement pursuant to subsection (a) and elects not to rebuild pursuant to subsection (b), the da maged portions of the Economic Development Property shall be treated as Removed Components. Section 4.8 Condemnation. (a) Complete Taking. If at any time during the Fee Term title to or temporary use of the Economic Development Property should become vested in a public or quasi-public authority by virtue of the exercise of a taking by condemnation, inverse condemnation, or the right of eminent domain; by voluntary transfer under threat of such taking; or by a taking of title to a portion of the Economic Development Property which renders continued use or occupancy of the Economic Development Property commercially unfeasible in the judgment of the Company, the Company shall have the option to terminate this Fee Agreement by sending written notice to the County within a reaso nable period of time following such vesting. (b) Partial Taking . In the event of a partial taking of the Economic Development Property or a transfer in lieu thereof, the Company may elect: (i) to terminate this Fee Agreement; (ii) subject to the Act and the terms and provisions of this Fee Agreement, to repair and restore the Economic Development Property, with such reductions or enlargements in the scope of the Economic Development Property, changes, alterations, and modifications (including the substitution and addition of other property) as the Company may desire, and all such changes, alterations, and modifications shall be considered as substitutions of the taken parts of the Economic Development Property; or (iii) to treat the portions of the Economic Development Property so taken as Removed Components. (c) The Company shall only be required to make FILOT payments as to all or any part of the tax year in which the taking occurs to the extent property subject to ad valorem taxes would otherwise have been subject to such taxes under the same circumstances for the period in question. 12 Section 4.9 Confidentiality/Limitation on Access to Project . The County acknowledges and understands that the Company utilizes confidential and proprietary processes and materials, services, equipment, trade secrets, and techniques (herein “Confidential Information”) and that any disclosure of Confidential Information concerning the Company’s operations may result in substantial harm to the Company and could thereby have a significant detrimental impact on the Company’s employees and also upon the County. The Company acknowledges that the County is subject to the Freedom of Information Act, and, as a result, must disclose certain documents and information on request absent an exemption. For these reasons, the Company shall clearly label all Confidential Information it delivers to the County “Confidential Information.” Therefore, the County agrees that, except as required by law, neither the County nor any employee, agent, or contractor of the County shall (i) request or be entitled to receive any such Confidential Information, or (ii) disclose or otherwise divulge any such Confidential Information to any other person, firm, governmental body or agency, or any other entity unless specifically required to do so by law; provided, however, that the County shall have no less rights concerning information relating to the Project and the Company than concerning any other property or property taxpayer in the County, and, provided further, that the confidentiality of such confidential or proprietary information is clearly disclosed to the County in writing as previously described. Prior to disclosing any Confidential Information, subject to the requirements of law, the Company may r equire the execution of reasonable, individual, confidentiality and non-disclosure agreements by any officers, employees, or agents of the County or any supporting or cooperating governmental agencies who would gather, receive, or review such information. In the event that the County is required to disclose any Confidential Information obtained from the Company to any third party, the County agrees to provide the Company with as much advance notice as possible of such requirement before making such disclosure, and to cooperate reasonably with any attempts by the Company to obtain judicial or other relief from such disclosure requirement. Section 4.10 Assignment. If Section 12-44-120 of the Act or any successor provision requires consent to an assignment, the Company may assign this Fee Agreement in whole or in part with the prior written consent of the County or a subsequent written ratification by the County, which consent or ratification the County will not unreasonably withhold. The Company agrees to notify the County and the Department of the identity of such transferee within 60 days of the transfer. In case of a transfer, the transferee assumes the transferor’s basis in the Project for purposes of calculating the Fee. No approval is required for transfers to sponsor affiliates or other financing related transfers, as defined in the Act. Section 4.11 No Double Payment; Future Changes in Legislation. (a) Notwithstanding anything contained herein to the contrary, and except as expressly required by law, neither the Company nor any Spons or shall ever be required to make a Payment in Lieu of Taxes in addition to a regular property tax payment in the same year over the same piece of property, nor shall the Company or any Sponsor be required to make a Payment in Lieu of Taxes on property in cases where, absent this Fee Agreement, property taxes would otherwise not be due on such property. In case there is any legislation enacted which provides for more favorable treatment for property to qualify as, or for the calculation of the fee related to, Economic Development Property under Sections 4.4, 4.6, 4.7, 4.8, or the calculation of the Investment Period, the County agrees to give expedient and full consideration to such legislation. Section 4.12 Administration Expenses . The Company agrees to pay the reasonable and necessary expenses that the County incurs with respect to the execution and administration of this Fee Agreement, including without limitation reasonable and actual attorneys’ fees (the “Administration Expenses”); provided, however, that no such expense shall be an Administration Expense until the County has furnished to the Company a statement in writing indicating the amount of such expense and the general reason for its incurrence. As used in this section, “Administration Expenses” shall include the reasonable and necessary expenses, including attorneys’ fees, incurred by the County with respect to: (i) this Fee Agreement; (ii) all other documents related to this Fee Agreement and any related documents; and (iii) the fulfillment of its obligations under this Fee Agreement and any related documents and the implementation and administration of the terms and provisions of the documents after the date of execution thereof, but 13 only as a result of a request by the Company for a modification, ass ignment, or a termination of such documents by the Company, or as a result of a bankruptcy of the Company or a default by the Company under the terms of such documents. Reimbursement for the County’s attorneys’ fees shall be according to the typical fee arrangement with the County, not to exceed $15,000, provided however, this limit does not apply to Section 4.14 or Section 5.5 of this Fee Agreement. Section 4.13 Execution of Lease. The parties acknowledge that the intent of this Fee Agreement is to afford the Company the benefits of the FILOT Payments in consideration of the Company’s decision to locate the Project within the County and that this Fee Agreement has been entered into in reliance upon the validity and enforceability of the Act. In the event that a court of competent jurisdiction holds that the Act is unconstitutional or that this Fee Agreement or agreements similar in nature to this Fee Agreement are invalid or unenforceable in any material respect, or should the parties determine that there is a reasonable doubt as to the validity or enforceability of this Fee Agreement in any material respect, then the County, upon the provision by the Company of evidence acceptable to the County that the Project is free from environmental contamination and the conveyance of title to the Project to the County at the expense of the Company, agrees to lease the Project to the Company pursuant to the Streamlined FILOT Act and, to the extent permitted under the law in effect at such time, use its best efforts to ensure that the Company receives the benefits of the FILOT arrangement as contemplated by this Fee Agreement. Section 4.14 Indemnification Covenants. (a) Except as provided in paragraph (d) below, the Company shall indemnify and save the County, its employees, elected officials, officers and agents (each, “Indemnified Party”) harmless against and from all liability or claims arising from the County’s execution of this Fee Agreement, performance of the County’s obligations under this Fee Agreement or the administration of its duties pursuant to this Fee Agreement, or otherwise by virtue of the County having entered into this Fee Agreement (collectively, “Losses”). (b) Any Indemnified Party seeking to be indemnified hereunder shall promptly notify the Company in writing of any claim that could reasonably be expected to result in Losses, specifying in reasonable detail the nature of such Losses. The Indemnified Party shall provide to the Company as promptly a s practicable thereafter all information and documentation reasonably requested by the Company to verify the Losses asserted. Upon the Company’s receipt of any notice of a claim pursuant to this Section 4.14, the Company may, by giving written notice to the Indemnified Party within 15 days following such notice, elect to assume the defense thereof, including the employment of counsel at the Company’s cost to carry out such defense; provided, that if the Indem nified Party is the County, in the event the County reasonably believes there are defenses available to it that are not being pursued or that the counsel engaged by the Company reasonably determines that a conflict of interest exists between the County and the Company, the County may, in its reasonable discretion, hire independent counsel to assume such defense, and the Company shall be liable for the reasonable cost of such counsel. Whether or not the Company chooses to defend such claim, all the parties hereto shall cooperate in the defense thereof and shall furnish such records, information and testimony and shall attend such conferences, discovery proceedings and trials as may be reasonably requested in connection therewith. The Company shall not be entitled to settle any such claim without the prior written consent of the Indemnified Party, which consent shall not be unreasonably withheld, conditioned or delayed. In the event that the Company does not elect to assume the defense of such claim pursuant to this Section 4.14, the Indemnified Party shall not settle any such claim without the prior written consent of the Company, which consent shall not be unreasonably withheld, conditioned or delayed. (c) Notwithstanding anything in this Fee Agreement to the contrary, the Company is not required to indemnify any Indemnified Party against or reimburse the County for Losses or any other amounts due under this Section 4.14: (i) occasioned by the acts of that Indemnified Party, which are unrelated to the execution of this Fee Agreement, performance of the County’s obligations under this Fee Agreement, or the administration of its duties under this Fee Agreement, or otherwise by virtue of the County having entered into this Fee Agreement; or (ii) to the extent that such Losses result from any 14 Indemnified Party’s negligence, bad faith, fraud, deceit, breach of this Fee Agreement or willful misconduct. (d) An Indemnified Party may not avail itself of the indemnification or reimbursement of costs provided in this Section 4.14 unless it provides the Company with prompt notice, reasonable under the circumstances, of the existence or threat of any claim or liability, including, without limitation, copies of any citations, orders, fines, charges, remediation requests, or other claims or threats of claims, to afford the Company notice, reasonable under the circumstances, within which to defend or otherwise respond to a claim. The indemnity specified in this Section 4.14 shall survive the termination of this Fee Agreement with respect to liability arising out of any event or act occurring prior to such termination. (e) The County is entitled to use counsel of its choice and the Company shall, reimburse the County for all of its costs, including attorneys’ fees, incurred in conne ction with the response to or defense against such liability or claims as described in paragraph (a), above. The County shall provide a statement of the costs incurred in the response or defense, and the Company shall pay the County within 30 days of receipt of the statement. The Company may request reasonable documentation evidencing the costs shown on the statement. However, the County is not required to provide any documentation which may be privileged or confidential to evidence the costs. ARTICLE V DEFAULT Section 5.1 Events of Default . The following shall be “Events of Default” under this Fee Agreement, and the term “Events of Default” shall mean, whenever used with reference to this Fee Agreement, any one or more of the following occurrences: (a) Failure by the Company to ma ke the Payments in Lieu of Taxes described in Section 4.1 hereof , which failure shall not have been cured within 30 days following receipt of written notice thereof from the County ; provided, however, that the Company shall be entitled to all redemption rights granted by applicable statutes; or (b) A representation or warranty made by the Company which is deemed materially incorrect when deemed made; or (c) Failure by the Company to perform any of the terms, conditions, obligations, or covenants hereunder (other than those under (a) above), which failure shall continue for a period of 30 days after written notice from the County to the Company specifying such failure and requesting that it be remedied, unless the Company shall have instituted corrective act ion within such time period and is diligently pursuing such action until the default is corrected, in which case the 30- day period shall be extended to cover such additional period during which the Company is diligently pursuing corrective action; or (d) A rep resentation or warranty made by the County which is deemed materially incorrect when deemed made; or (e) Failure by the County to perform any of the terms, conditions, obligations, or covenants hereunder, which failure shall continue for a period of 30 days af ter written notice from the Company to the County specifying such failure and requesting that it be remedied, unless the County shall have instituted corrective action within such time period and is diligently pursuing such action until the default is corr ected, in which case the 30 -day period shall be extended to cover such additional period during which the County is diligently pursuing corrective action. 15 Section 5.2 Remedies on Default. (a) Whenever any Event of Default by the Company shall have occurred and shall be continuing, the County may take any one or more of the following remedial actions: (i) terminate the Fee Agreement , upon 30 days’ notice to the Company and any Sponsor (which notice period shall not be applicable in the case of the failure to make any payments due under this Fee Agreement); or (ii) take whatever action at law or in equity may appear necessary or desirable to collect the amounts due hereunder. In no event shall the Company be liable to the County or otherwise for monetary damages resulting from the Company’s failure to meet the Act Minimum Investment Requirement, other than as expressly set forth herein. (b) Whenever any Event of Default by the County shall have occurred or shall be continuing, the Company may take one or more of the following actions: (i) bring an action for specific enforcement; (ii) take whatever action at law or in equity may appear necessary or desirable to collect the amounts due hereunder. Section 5.3 Additional Collect ion and Enforcement Rights of County . The parties acknowledge that, as provided in Section 12-44-90 of the Code, the County’s right to receive payments in lieu of taxes hereunder shall be the same as its rights conferred under Title 12 of the Code relating to the collection and enforcement of ad valorem property taxes and, for purposes of this application, payments in lieu of taxes due hereunder shall be considered a property tax. Section 5.4 Remedies Not Exclusive. No remedy conferred upon or reserved to the County or the Company under this Fee Agreement is intended to be exclusive of any other avail able remedy or remedies, but each and every remedy shall be cumulative and shall be in addition to every other lawful remedy now or hereafter existing. No delay or omission to exercise any right or power accruing upon any continuing default hereunder shall impair any such right or power or shall be construed to be a waiver thereof, but any such right and power may be exercised from time to time and as often as may be deemed expedient. Section 5.5 Reimbursement of Legal Fees and Expenses and Other Expenses . Upon the occurrence of an Event of Default hereunder, should a party be required to employ attorneys or incur other reasonable expenses for the collection of payments due hereunder or for the enforcement of performance or observance of any obligation or agreement, the successful party shall be entitled, within 30 days of demand therefor, to reimbursement of the reasonable fees of such attorneys and such other reasonable expenses so incurred. ARTICLE VI MISCELLANEOUS Section 6.1 Notices. Any notice, election, demand, request, or other co mmunication to be provided under this Fee Agreement shall be effective when delivered to the party named below or when deposited with the United States Postal Service, certified mail, return receipt requested, postage prepaid, addressed as follows (or addr essed to such other address as any party shall have previously furnished in writing to the other party), except where the terms hereof require receipt rather than sending of any notice, in which case such provision shall control: 16 IF TO THE COMPANY: [Project Shaker] Attn: ___________ ________________ ________________ WITH A COPY TO (which shall not constitute notice): Haynsworth Sinkler Boyd, P.A. Attn: Katherine Busbee P.O. Box 2048 Greenville, SC 29602 IF TO THE COUNTY: Oconee County, South Carolina Attn: County Administrator 415 S. Pine Street Walhalla, SC 29691 WITH A COPY TO (which shall not constitute notice): King Kozlarek Root Law LLC Attn: David A. Root Post Office Box 565 Greenville, South Carolina 29602-0565 AND King Kozlarek Root Law LLC Attn: Michael E Kozlarek Post Office Box 565 Greenville, South Carolina 29602-0565 Section 6.2 Binding Effect . This Fee Agreement and each document contemplated hereby or related hereto shall be binding upon and inure to the benefit of the Company, the County, and their respective successors and assigns. In the event of the dissolution of the County or the consolidation of any part of the County with any other political subdivision or the transfer of any rights of the County to any other such political subdivision, all of the covenants, stipulations, promises, and agreements of this Fee Agreement shall bind and inure to the benefit of the successors of the County from time to time and any entity, officer, board, commission, agency, or instrum entality to whom or to which any power or duty of the County has been transferred. Section 6.3 Counterparts. This Fee Agreement may be executed in any number of counterparts, and all of the counterparts taken together shall be deemed to constitute one and the same instrument. Section 6.4 Governing Law. This Fee Agreement and all documents executed in connection herewith shall be construed in accordance with and governed by the laws of the State of South Carolina. Section 6.5 Headings. The headings of the articles and sections of this Fee Agreement are inserted for convenience only and shall not be deemed to constitute a part of this Fee Agreement. 17 Section 6.6 Amendments. The provisions of this Fee Agreement may only be modified or amended in writing by any agreement, or agreements entered into between the parties. Section 6.7 Further Assurance. From time to time, and at the expense of the Company, to the extent any expense is incurred, the County agrees to execute and deliver to the Company such additional instruments as the Comp any may reasonably request and as are authorized by law and reasonably within the purposes and scope of the Act and Fee Agreement to effectuate the purposes of this Fee Agreement. Section 6.8 Invalidity; Change in Laws. In the event that the inclusion of property as Economic Development Property or any other issue is unclear under this Fee Agreement, the County hereby expresses its intention that the interpretation of this Fee Agreement shall be in a manner that provides for the broadest inclusion of property under the terms of this Fee Agreement and the most commensurate incentive permissible under the Act, to the extent not inconsistent with any of the explicit terms hereof. If any provision of this Fee Agreement is declared illegal, invalid, or unenforceable for any reason, the remaining provisions hereof shall be unimpaired, and such illegal, invalid, or unenforceable provision shall be reformed to effectuate most closely the legal, valid, and enforceable intent thereof and so as to afford the Company with the benefits to be derived herefrom, it being the intention of the County to offer the Company the strongest inducement possible, within the provisions of the Act, to locate the Project in the County. In case a change in the Act or South Carolina laws eliminates or reduces any of the restrictions or limitations applicable to the Company and the Fee incentive, the parties agree that the County will give expedient and full consideration to reformation of this Fee Agreement, with a view toward providing the Company with the benefits of such change in the Act or South Carolina laws. The County agrees that in case the FILOT incentive described herein is found to be invalid or otherwise does not provide the Company with the economic benefit it is intended to receive from the County as an inducement to locate in the County, the savings lost as a result of such invalidity will be considered a special source revenue credit or infrastructure improvement credit to the Company (in addition to the Infrastructure Credit explicitly provided for above) to the maximum extent permitted by law, and the County will provide a special source revenue credit or infrastructure improvement credit against all FILOT payments or fee payments made or to be made by the Company equal to the amount that the Company would have saved if the FILOT had been valid, to the maximum extent permitted by law. Section 6.9 Force Majeure . The Company shall not be responsible for any delays or non- performance caused in whole or in part, directly or indirectly, by strikes, accidents, freight embargoes, fires, floods, inability to obtain materials, conditions arising from governmental orders or regulations, war, or national emergency, acts of God, and any other cause, similar or dissimilar, beyond the Company’s reasonable control , provided, however, this Section 6.9 shall not apply to any payment(s) due by the Company to the County under this Fee Agreement. Section 6.10 Termination by Company . The Company is authorized to terminate this Fee Agreement at any time with respect to all or part of the Project upon providing the County with written notice of termination, and such termination shall be effective as of the date determined by the Company ; provided, however, that (i) any monetary obligations existing hereunder and due and owing at the time of termination to a party hereto; and (ii) any provisions which are intended to survive termination, shall survive such termination. In the year following the effective date of termination, all property shall be subject to ad valorem taxation or such other taxation or fee in lieu of taxation that would apply absent this Fee Agreement. The Company’s obligation to make fee in lieu of tax payments under this Fee Agreement shall terminate in the year following the effective date of such termination pursuant to this section. Section 6.11 Entire Understanding. This Fee Agreement expresses the entire understanding and all agreements of the parties hereto with each other with respect to its subject matter , and neither party hereto has made or shall be bound by any agreement or any representation to the other party which is not expressly set forth in this Fee Agreement or in certificates delivered in connection with the execution and delivery hereof. 18 Section 6.12 Waiver. Either party may waive compliance by the other party with a ny term or condition of this Fee Agreement only in a writing signed by the waiving party. Section 6.13 Business Day. In the event that any action, payment, or notice is, by the terms of this Fee Agreement, required to be taken, made, or given on any day which is a Saturday, Sunday, or legal holiday in the jurisdiction in which the person obligated to act is domiciled, such action, payment, or notice may be taken, made, or given on the following business day with the same effect as if given as required hereby, and no interest shall accrue in the interim. Section 6.14 Limitation of Liability . Anything herein to the contrary notwithstanding, any financial obligation the County may incur hereunder, including for the payment of money, shall not be deemed to constitute a pecuniary liability or a debt or general obligation of the County; provided, however, that nothing herein shall prevent the Company from enforcing its rights hereunder by suit for mandamus or specific performance. Section 6.15 State Law Considerations. The authorization, execution, and delivery of this Fee Agreement, and any obligations of the County under this Fee Agreement, are subject to any law that may relate to the FILOT Payments or Infrastructure Credit , or both, and State law generally. This Fee Agreement and any obligations of t he County under this Fee Agreement are not intended to violate State law in any respect. [ONE SIGNATURE PAGE AND ONE EXHIBIT FOLLOW] [REMAINDER OF PAGE SUBSTANTIVELY BLANK] 19 IN WITNESS WHEREOF, the County, acting by and through the County Council, has caused this Fee Agreement to be executed in its name and behalf by the County Administrator or County Council Chairman and to be attested by the Clerk of the County Council; and the Company has caused this Fee Agreement to be executed by its duly authorized officer, all as of the day and year first above written. OCONEE COUNTY, SOUTH CAROLINA Signature: Name: Title: ATTEST: Signature: Name: Title: Clerk to County Council [PROJECT SHAKER] Signature: Name: Title: 20 EXHIBIT A LEGAL DESCRIPTION [To come.] [TMS No. to come] 21 EXHIBIT B FORM OF JOINDER AGREEMENT JOINDER AGREEMENT Reference is hereby made to the Fee Agreement, effective [________] , 2024 ( “Fee Agreement”), between Oconee County, South Carolina (“County”), and [Project Shaker] (collectively, with any Sponsor Affiliate, “Sponsor”). 1. Joinder to Fee Agreement. [], a [state] [corporation/limited liability company/limited partnership] authorized to conduct business in the State, hereby (a) joins as a party to, and agrees to be bound by and subject to all of the terms and conditions of, the Fee Agreement as if it were a Sponsor; (b) shall receive the benefits as provided under the Fee Agreement with respect to the Economic Development Property placed in service by the [Sponsor] [Affiliate] as if it were a Sponsor; (c) acknowledges and agrees that (i) according to the Fee Agreement, the undersigned has been designated as a [ Sponsor] [Affiliate] by the Sponsor for purposes of the Project; (ii) the undersigned qualifies or will qualify as a [Sponsor] [Affiliate] under the Fee Agreement and Section 12-44-30(20) and Section 12-44-130 of the Act; and (iii) agrees that electronic signatures, whether digital or encrypted, of the parties to this Joinder Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures. Electronic signature means any electronic sound, symbol, or process attached to or logistically associated with a record and executed and adopted by a party with the intent to sign such record, including facsimile or email signatures. 2. Capitalized Terms. Each capitalized term used, but not defined, in this Joinder Agreement has the meaning of that term set forth in the Fee Agreement. 3. Representations of the [Sponsor] [Affiliate]. The [Sponsor] [Affiliate] represents and warrants to the County as follows: 1. The [Sponsor] [Affiliate] is in good standing under the laws of the state of its organization, is duly authorized to transact business in the State (or will obtain such authority prior to commencing business in the State), has power to enter into this Joinder Agreement, and has duly authorized the execution and delivery of this Joinder Agreement. 2. The [Sponsor] [Affiliate]’s execution and delivery of this Joinder Agreement, and its compliance with the provisions of this Joinder Agreement, do not result in a default, not waived, or cured, under any agreement or instrument to which the [ Sponsor] [Affiliate] is now a party or by which it is bound. 3. The execution and delivery of this Joinder Agreement and the a vailability of the FILOT and other incentives provided by this Joinder Agreement has been instrumental in inducing the [Sponsor] [Affiliate] to join with the original Sponsor in the Project in the County. 4. Request of [ Sponsor] [Affiliate]. The [Sponsor] [Affiliate] hereby requests and consents to its addition, as a “[sponsor] [affiliate]” to the Fee Agreement. 5. Request of Sponsor. The original Sponsor hereby requests and consents to the addition of [] as a “[sponsor] [affiliate]” to the Fee Agreement. 6. Governing Law. This Joinder Agreement is governed by and construed according to the laws, without regard to principles of choice of law, of the State. 7. Notice. Notices under Section 6.1 of the Fee Agreement shall be sent to the [Sponsor] [Affiliate] at: [                   ] 22 IN WITNESS WHEREOF, the Sponsor requests and consents to the County’s consenting to the addition of the above-named entity as a Sponsor Affiliate under the Fee Agreement effective as of the date set forth below. Date: _______________________ [PROJECT SHAKER] By:                                                                 Its:                                                                 IN WITNESS WHEREOF, the undersigned has executed this Joinder Agreement to be effective as of the date set forth above. [NAME OF ADDITIONAL SPONSOR/SPONSOR AFFILIATE] By:                                                                 Its:                                                                 IN WITNESS WHEREOF, at the Sponsor’s and the Sponsor Affiliate’s request, the County acknowledges it has consented to the addition of the above -named entity as a Sponsor Affiliate under the Fee Agreement effective as of the date set forth above. OCONEE COUNTY, SOUTH CAROLINA By:                                                                               [Name], Chairman Oconee County Council [SEAL] 23 EXHIBIT C FORM OF ANNUAL INFRASTRUCTURE CREDIT CERTIFICATE ANNUAL INFRASTRUCTURE CREDIT CERTIFICATE Reference is hereby made to the Fee Agreement, effective [_______] , 2024 ( “Fee Agreement” ), between Oconee County, South Carolina ( “County”), and [_____________] (collectively, with any Sponsor Affiliate, “ Sponsor”). Each capitalized term used in this Cert ificate, but not defined in this Certificate has the meaning ascribed to that term in the Fee Agreement. According to Section 4.1 of the Fee Agreement, the undersigned authorized officer of the Sponsor certifies to the County as follows: 1. The Sponsor is entitled to claim an Infrastructure Credit (“Credit”) against each FILOT Payment, on or before the date after which ad valorem taxes become delinquent in which a FILOT Payment is due with respect to the Project, as follows: The Credit commences with the property tax year after the year in which the first Phase of the Project is placed in service and shall remain effective and wil l be a 50 % Credit for years one (1) through seven (7). 2. The Sponsor expended, in aggregate, $___________________________ in Qualifying Infrastructure Costs in the Project. 3. The Sponsor is entitled to a Credit for this tax year, calculated as follows: FILOT Payment x 50% (years 1 through 7); = $____________________________ 4. The total amount that the Sponsor is entitled to deduct and that the County will deduct from the FILOT Payment, is: $________________________________. 5. The Credit specified in this Certificate for the current property tax year, together with the amount of all Credits previously claimed pursuant to the Fee Agreement, do not, in the aggregate, exceed the total cost of all infrastructure improvements funded by the Sponsor for which a Credit is permitted under the Act. IN WITNESS WHEREOF, I have executed this Certificate as of ______________________. [PROJECT SHAKER] Signature:                                                              Name:                                                               Title:                                                               Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: October 15, 2024 COUNCIL MEETING TIME: 6:00 PM____ ITEM TITLE [Brief Statement]: Council consideration to approve an inducement resolution and ordinance between Project Shaker and Oconee County to expand its manufacturing operations in Oconee County. BACKGROUND DESCRIPTION: Project Shaker is an advanced manufacturing company that is considering Oconee County as a location for an expansion of their operation. The project will include the construction a 100,000 square foot addition with an expected capital investment of $12.5 million and 41 new jobs. The Oconee Economic Alliance (OEA) has been working with the project since January 2024. We have discussed with the company and SC Department of Commerce property tax reductions and several state incentives to secure the project in Oconee. OEA is recommending the following county incentives for the project: 1. A 30-Year Fee-In-Lieu-of- Tax (FILOT) agreement with an assessment rate of 6% and fixed millage rate of 214.9 mills, 2. A 7-Year Special Source Revenue Credit (SSRC) at 50% annually. SPECIAL CONSIDERATIONS OR CONCERNS [only if applicable]: • The project would be making a strong commitment to strengthen their Oconee County operation. • The project is competing with other company facilities in several states. • Existing industry is our top prior ity and the county is committed to assisting businesses that seek to grow their operations in the county. • OEA asks that the County Council allow us to bring to you an ordinance and fee agreement for consideration at the October 15 meeting. FINANCIAL IMPACT [Brief Statement]: • The project would generate an estimated $845,458 in property taxes over the first 10 years, $2,155,792 over 20 years and $3,466,125 over 30 years. • The FILOT and SSRC represent a property tax reduction of approximately $262,035 over t he first 10 years, $582,464 over 20 years and $1,166,822 over 30 years from the standard ad valorem taxes which includes the state statutory 5-year manufacturers abatement. Check here if Item Previously approved in the Budget. No additional information required. Approved by: ________Finance ATTACHMENTS STAFF RECOMMENDATION [Brief Statement]: It is the staff’s recommendation that Council approve the inducement resolution and ordinance for Project Shaker. Submitted or Prepared By: Approved for Submittal to Council: __________________________ _____________________________________ Jamie Gilbert, Economic Development Director Amanda F. Brock, County Administrator 1 STATE OF SOUTH CAROLINA COUNTY OF OCONEE RESOLUTION 2024-18 A RESOLUTION CONCERNING CERTAIN ALLOCATIONS OF BOND PROCEEDS FOR CAPITAL PROJECTS WHEREAS, following public readings on July 18, 2023, August 15, 2023, and September 5, 2023, along with public hearings on July 18, 2023 and September 5, 2023, Oconee County Council (“Council”) adopted Ordinance No. 2023- 13 (“Bond Ordinance”) finding it was in the best interest of the County’s citizens for Council to provide for the issuance of one or more general obligation bonds in the aggregate amount of twenty- five million dollars and no cents ($25,000,000.00) (“Bond Proceeds”); WHEREAS, Council adopted the Bond Ordinance to provide funding for various capital projects in Oconee County (“County”), including wastewater improvements and related equipment for a public and corporate purpose conferring benefits upon Oconee County’s citizenry as a whole; WHEREAS, Council thereafter delivered a full record of the proceedings resulting in the adoption of the Bond Ordinance and issuance of bonds thereunder to the Clerk of Court of Oconee County, South Carolina on November 8, 2023; WHEREAS, Ordinance No. 2023- 13 specifically authorized the County to adopt subsequent resolutions about how bond proceeds shall be allocated for use in relation to the capital projects contemplated by Council. In pertinent part, Section 20 of the Bond Ordinance states , “[T]he County may amend the project description by subsequent resolution of the C ouncil, provided the par amount, without regard to premium, if any, of the Bonds does not exceed $25,000,000.”; WHEREAS, by adopting this Resolution, Council desires to provide: additional detail, by amendment, for certain of the capital projects for which the Bond Proceeds were and are intended 2 to be allocated; confirmation that the par amount for such capital projects shall not exceed twenty- five million dollars and no cents ( $25,000,000); and such capital projects have been found by Council to confer benefits upon all Oconee County citizens consistent with Council’s intent when enacting the Bond Ordinance; WHEREAS, Council adopts this Resolution in furtherance of its implementation of the Bond Ordinance to secure the intended benefits for the whole of the County’s citizenry. NOW, THEREFORE, Council hereby: (1) As to Allocations of Certain Bond Proceeds. Resolves to confirm the allocation of certain of the Bond P roceeds as to specific capital projects benefitting the County’s citizens as a whole to include those projects with following project descriptions: (1) Sewer South Phase II (located from the Golden Corner Commerce Park to I -85 (Exit 1); (2) Sewer Infrastructure Expansion at Durham Road (located along I-85 (Exits 2 & 3); (3) Sewer Infrastructure Expansion at Exit 4 (located at Blue Ridge Electric Cooperative Industrial Site); (4) Sewer Infrastructure Expansion at Exit 1 (north) (located at South Carolina Highway 11); (5) Business and Industry Park Site Improvements (located at Golden Corner Commerce Park/Seneca Rail Park) (treated herein as, “Bond Allocations.”) (2) As to Remaining Bond Proceeds After Bond Allocations . Resolves to confirm that any unallocated amount of Bond Proceeds , not specified above, shall similarly be used for other capital projects within the County for the benefit of its citizenry. In that regard, Council reserves the right to adopt an additional future resolution about such later allocations, to the extent needed, in order to implement the Bond Ordinance and accomplish its intended public benefit in a manner conforming to both the 3 Bond Ordinance and applicable law. Council further reserves the right to amend the instant Resolution to take into account changes in capital projects or such other needs, as may from time to time arise. (3) As to the Reaffirmation of Benefits Accruing to the Whole of the County’s Citizens . Resolves to reaffirm its prior legislative intent and findings, when in enacting Ordinance No. 2023- 13, C ouncil determined the Bond Ordinance, Bond Proceeds, and Bond Allocations, as originally contemplated and adopted , would c onfer substantial benefits upon the County’s citizenry as a whole. In reaffirming its prior findings in that regard, Council identifies the following bases supporting its decision -making based upon the record and assessment of the County’s needs historically: (A) The Bond A llocations will confer benefits upon all County citizens in relation to engineering benefits (“Engineering Benefits”), as further discussed in the Declaration of Ryan Page, P.E. (“Page Declaration”) and the Declaration of Richard Blackwell (“Blackwell Declaration ”), which were considered and accredited by Council. Specifically, Council finds the Bond Alloca tions will be used for capital projects accruing the following Engineering Benefits: • Environmental Benefits. The Bond Allocations will result in improved and superior environmental outcomes as a whole in Oconee County thereby benefiting all citizens. The Bond Allocations relate to capital projects that will decrease overall reliance upon septic tanks in Oconee County. (Page Declaration, ⁋⁋23-27.) A decrease in septic tanks, in turn, decreases ground water and surface water contamination and the attendant risks 4 thereof. (Id.) Such contaminants can contaminate water sources providing drinking water to all Oconee County residents, not just those residing in the southern part of the County. (Id. at ¶23.) The Bond Allocations will further preserve and safeguard the County’s natural water resources. (Id. at ¶24.) Specifically, septic tanks located in the southern portion of Oconee County, including the Golden Corner area, discharge sewer effluent into Lake Hartwell. (Id. at ¶25.) “It is well documented that public sewer infrastructure results in significantly less effluent discharge, thereby reducing groundwater and surface water contamination from sewer storage in septic tanks.” (Id. at ¶24.) 1 Installing public sewer infrastructure, as contemplated by the Bond Allocations, will reduce the amount of contaminants reaching Lake Hartwell, which benefits all of Oconee County’s citizens, who use the lake for recr eation, irrigation, and as a source of water. ( Id. at ¶26.) Accordingly, Council finds that efforts to preserve the County’s natural water resources, such as will ensue from the Bond Allocations, continue to make such resources available for use by all County citizens, both directly and by way of redundant water supply sources in the event of the intermittent unavailability of other sources. In this way, Council finds the Bond Allocations benefit all County citizens by preserving the County’s natural water resources. (Id. at ¶26.) • Economies of Scale. 1 It should also be noted that the Bond Allocations will allow for the termination of the SC Welcome Center septic tank system, located on S. Highway 11 at the South Carolina / Georgia border. 5 The Bond Allocations will also result in improved economies of scale for utility recipients countywide. 2 (Page Declaration, ¶¶20 -22; Blackwell Declaration , ¶¶16 -17.) Council finds that installation of additional public sewer infrastructure will increase the number of users of existing utilities, including but not limited to public sewer systems, thereby decreasing the costs per user to deliver such services. (Id.) Based upon the record before it and experience, Council finds this is particularly true in relation to commercial or industrial utility users that consume more utility services and typically pay higher rates. (Blackwell Declaration at ¶17.) Council further finds the Bond Allocations are intended and will likely attract commercial or industrial utility users. (Page Declaration at ¶¶14-18, 21; Blackwell Declaration at ¶¶ 8-16.) The addition of such utility users “spreads the economic burden” across a greater number of users and increases the percentage of industrial users paying a higher rate thereby benefiting residential users in return. ( Id.) In turn, the increase of fee-paying users decreases the potential risk of default for such utilities when repaying costs ass ociated with building such infrastructure. (Page Declaration at ¶ 22.) As a result, Council finds that the Bond Allocations 2 Note also that i n addition to the Count y’s partnership with the State of South Carolina and the South Carolina Department of Parks, Recreation and Tourism to service the Welcome Center (see above), the County intends to serve the Blue Ridge Electric Industrial / Commerce site near Exit 4 of I- 85, which would benefit the Cooperative’s approximate 35,000 Oconee members. 6 will confer a benefit upon all County citizens since it will enhance the economies of scale associated with the delivery of existing utility systems. (B) The Bond Allocations will confer benefits upon all County citizens relating to economic benefits (“Economic Benefits”). In addition to being confirmed by serial prior studies by the County, dating back several decades, such Econom ic Benefits are similarly discussed by the Page and Blackwell Declarations, along with the Declaration of County Administrator Amanda Brock. Specifically, Council finds the Bond Allocations will accrue the following Economic Benefits: • Fulfillment of a Long Recognized Need for Funded Capital Projects. The County has historically studied what public assets are needed to promote economic growth. All of the Bond Allocations fulfill needs identified by such studies for several decades, as confirmed by the attachments to the Declaration of County Administrator, Amanda Brock (“Brock Declaration”). Without the benefit of the capital projects funded by the Bond Allocations, the County has historically lost a slew of business development opportunities. (See Brock Declaration, ¶¶4-8). Council finds the previous studies undertaken by the County, as reflected by the Brock Declaration and its attachments, further confirm the Bond Allocations will confer significant benefits upon all County citizens. • Increased Economic Activity. Council finds the Bond Allocations will result in economic growth in Oconee County beneficial to all of its citizens. “[C]apital investment and industry generally follow sewer infrastructure.” (Blackwell Declaration at 7 ¶7; see also Page Declaration at ¶21.) As Mr. Blackwell stated: “no product, no project.” (Blackwell Declaration at ¶9.) Council finds that it is vital to Oconee County’s present and future that it has a “product” such that it can land “project[s]” in furtherance of the County’s economic growth and benefit of its citizens. Council notes that the County previously has lost major employers due to the lack of sewer infrastructure. ( Blackwell Declaration at ¶¶10-11; see also Page Declaration at ¶¶14-15.) By contrast, Oconee County’s ability to attract major employers through the installation of needed sewer infrastructure will create potential job opportunities for all of the County’s citizens. (Blackwell Declaration at ¶13; Page Declaration at ¶¶16-18.) Prior examples of the County having installed public sewer infrastructure resulting in the attraction of new employers teach that economic growth requires taking those steps needed to have a “product” to present to those industries the County would benefit from attracting. (Blackwell Declaration at ¶13; Page Declaration at ¶16.) Council finds the Bond Allocations will result in several other economic advantages beneficial to all County citizens. Not only will installation of public sewer infrastructure increase the property values of the owners served by such infrastructure but Council finds it will also increase revenues to the County as a whole thereby increasing Council’s ability to enhance other public s ervices need ed by our citizens. ( Blackwell Declaration at ¶18; Page Declaration at ¶19.) The Bond Allocations will also allow Oconee County to keep the vibrancy and talent of its young 8 people by providing them a community they will want to return to or never leave. ( Blackwell Declaration at ¶¶20 -21.) Economic growth similarly promotes other secondary markets thereby causing further economic benefits. (Blackwell Declaration at ¶19.) In short, “Economic growth begets economic growth, while economic stagnation begets economic stagnation.” (Blackwell Declaration at ¶19.) As Governor Henry McMaster noted in his 2023 State of the State Address: Rural South Carolina has everything it needs for beauty and tranquility. But what it needs for good public and economic health is water and sewer. The right wa ter and sewer systems in a county can transform a tax base. That means jobs, good schools, strong families, and a safe and vibrant community. McMaster, Henry. “State of the State Address 2023.” 25 Jan. 2023. It is for these reasons, Council finds that i t is in the best interest of all County citizens for its decisions to promote jobs, good schools, strong families, and a safe and vibrant community, not stagnation. Council finds the Bond Allocations accomplish these goals. (4) Compliance With Applicable Law and Court Orders . Nothing in this Resolution should be construed to indicate or mean that Oconee County Council will move forward with expending any of the Bond Allocations set forth herein in any manner or fashion that would violate applicable law or order of any court of competent jurisdiction. Rather, the instant Resolution is intended to reaffirm and articulate with particularity how the Bond Allocations shall be used when Council is freely allowed to use them and by reaffirming Council’s prior deliberative legislative process when enacting the 9 Bond Ordinance. For the reasons stated above, Council again confirms the capital projects referenced in the Bond Ordinance, inclusive of the Bond Allocations, confer significant benefits upon all citizens of Oconee County, South Carolina. ADOPTED, by a vote of __ to __, by the Oconee County Council in a meeting duly assembled this ___ day of November 2024, at which a quorum was present and voting. OCONEE COUNTY COUNCIL _____________________________ Matthew Durham, Chairman IN WITNESS WHEREOF, I Have set my hand and the official County seal, effective November __, 2024. ATTEST: ________________________________ Jennifer C. Adams, Clerk to Council (SEAL) Oconee County, South Carolina Page 1 of 6    STATE OF SOUTH CAROLINA COUNTY OF GREENVILLE DECLARATION OF RICHARD BLACKWELL I, Richard Blackwell, who firs t being duly sworn, deposes and states under the penalty of perjury the following: 1. My name is Richard Blackwell. 2. I am over the age of eighteen (18) and am competent to give this testimony. 3. I am currently the Vice President of Developm ent for the Southeast Region at Agrecel, Inc., an industrial real estate development compan y that primarily focuses on projects in the southeastern United States, and specifically, throughout South Carolina. 4. I have a B.A. in Political Science and an M.A. in Public Administration from the University of South Carolina. I have over twenty (20) years of economic deve lopment experience in public service and private indus try, with a majority of that time spent focusing on South Carolina. 5. In public service, I served as the Presiden t of the South Carolina Economic Developers Association and as the Oconee County Economic Alliance Director from 2012-2018. In 2022, I was appointed by Governor Henry McMaster and confirmed by the South Carolina Senate to serve as the South Carolina “District 3 Representative” on the South Carolina Jobs-Economic Development Authority Board (SC JEDA), which is a post I still hold today. 6. Unless otherwise indicated, I have personal kn owledge of the facts and opinions set forth herein through my significant experience in economic development and familiarity with Page 2 of 6    economic development in South Carolina, and specifically, in Oconee County. The information contained herein is true and correct to the best of my information and belief. 7. Based upon my training and experience, the c onstruction of sewer in frastructure provides benefits to County citizens beyond the immediate geographic area where such infrastructure is actually built. 8. As an initial matter, capital investment and industry generally follows sewer infrastructure. Industry and employers will not move into an area without public sewer infrastructure because traditional septic systems cannot support the busi ness needs of such enterprises relative to volume and treatment. 9. There is a saying in the economic development space, “no product, no project.” That saying illustrates the necessity of having infrastructu re installed in an industrial park before companies, industries, multi-family developers, or other businesses will even entertain the idea of moving into an area. 10. For example, the lack of sewer infrastructure was a major factor in Oconee County losing manufacturer Dunlop (Taylor Made) to an indus trial park in Pickens County. At the time, Dunlop had been located in Ocon ee County for nearly forty (40) years and was interested in moving to a larger site to fulfill its land ma ss needs. However, Oconee County only had raw undeveloped land without infrastructure to offer. As a result, Dunlop chose a site in Pickens County with fully installed sewage infrastructu re already available. Again, “no product, no project.” 11. This is just one of many examples that I pe rsonally experienced while working in economic development on behalf of Oconee County. Over all, capital investment and industry will choose already developed land with utility infrastructure over undeveloped raw land. Page 3 of 6    12. In my experience, capital investment and i ndustry moving into discrete areas of Oconee County ( e.g., the southern portion of the County) will confer significant benefits upon all County citizens, not just those where the sewer infrastructure is built. 13. This is true because attractin g industry and major employers into a given area creates new potential jobs for all of Oconee County’s citizens. Employers that are targeted to move into certain locations must employ individuals with diverse backgrounds, experience, and training- -meaning they will employ residents from all throughout Oconee County ( i.e., up to an hour commute in some cases). While residents in the immediate area will obviously benefit too, citizens throughout the enti re county where infrastructure is built will be employed by the companies attracted to locate in Oconee by available public sewer infrastructure. 14. One illustration of the wide-reaching employers attracted to locations with public sewer infrastructure is the RBC Aerospace location in the Oconee County Commerce Center, which I was personally involved in recruiting to the area as the Oconee County Economic Alliance Director. RBC Aerospace was originally located in Rabun County, Georgia but relocated to Oconee County. People who work for RBC Aerosp ace commute to work from all parts of Oconee County and elsewhere. 15. Similarly, if the planned sewer infrastructure is built in the southern portion of Oconee County, as is contemplated by the County’s current plan, other major employers like RBC Aerospace will be attracted to move into Oconee County creating job opportunities for citizens throughout the County and reaping other economic benefits as well. Increasing the amount of available jobs within a commutable di stance to all residents of Oc onee County, in my opinion and experience, will confer substa ntial benefits upon all Oconee County citizens. Conversely, Page 4 of 6    without available public sewer infrastructure, major employers will not seriously consider Oconee County as a site for future operations. 16. Attracting major industry and employers into Oconee County also greatly benefits utility providers in the area. When large utility us ers like major companies and employers connect and use the utilities in an area, it spreads the burden and costs of such utilities among a greater number of users. Large corporate utility users pay higher rates for the utilities they consume when compared to traditional re sidential users, which benefits all county residents, including those located within cities, who are also connected to those utility lines. 17. If you extend sewer lines to the interstate and attr act new, larger utility users, all users of that utility benefit, especially traditional resident ial users whose fees decr ease (or at least do not increase as rapidly over time) by the addition of such large users. For example, Oconee County Joint Regional Sewer Authority will benefit if sewer infrastructure is installed in the southern portion of Oconee County thereby attracting companies and industry to that region of the County. Rate-paying citizens residing within Oconee County’s cities in Oconee County will similarly benefit (e.g., Seneca, Walhalla, and Westminster). This is true because the addition of industries paying higher rates than the residential users in those cities “spreads the economic burden” of providing sewer treatment to all users. 18. For the reasons stated above , the property value of land surrounding newly built sewer infrastructure significantly incr eases, which likewise provides a be nefit to the entire county. Increasing property values not only benefits the landowners of the property but also generates additional revenues for the County. And, those re venues can then be used to enhance further public benefits to all County ci tizens in terms of improving road s, schools, and other needed public services beneficial to all County citizens. Page 5 of 6    19. In addition to the benefits flowing from the construction of sewer in frastructure discussed above, there are other benefits that will flow to all residents of Oconee County. As discussed above, sewer infrastructure attracts industr y and employers in th e form of economic development. Economic development not only brings employers, jobs, and employees into the area, but it also creates secondary markets targeting th e additional people the economic development attracts to the area. Restaurants, schools, multi-family and single-family housing, retail stores, and other enterprises follow peopl e and infuse vitality to the community where growth occurs. In this way, economic growth unsurprisingly begets economic growth, while economic stagnation begets economic stagnation. 20. From an economic standpoint, Oconee County not only wants to bring in jobs, but also wants the people who take those jobs to choose to live, go to church, spend their time, buy a home, pay their taxes, and send their kids to sc hools in Oconee County. The secondary market enterprises that ensue from economic developmen t improve the overall quality of life for all residents in Oconee County. Such growth incentivizes more people, especially young people, to move into the area for jobs, buy homes in th e area, and stay in the area for many years to come. But, none of this occurs absent the construction of public sewer infrastructure. 21. Economic growth also incentivizes people who grew up and went to school in Oconee County to pursue their careers in Oconee County, rather than going to other communities perceived as being a “better fit” for young professionals. Tale nt retention and attrac tion are critical for Oconee County’s growth and sustainability, which starts by creating a community where our children desire to work, live, and raise families. Creating that environment begins with projects like building sewer infrastructure such as the one contemplated by Oconee County. Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 17, 2024 COUNCIL MEETING TIME: 6:00 PM ITEM TITLE [Brief Statement]: Council discussion and consideration of the submission of the FY 2024 National Dam Safety Program Rehabilitation of High Hazard Potential Dam (HHPD) grant application to the South Carolina Department of Environmental Services on behalf of the Chattooga Lake Club. BACKGROUND DESCRIPTION: • Through the Rehabilitation of High Hazard Potential Dams (HHPD) Grant Program, FEMA’s National Dam Safety Program (NDSP) has made federal funds available to states for FFY24 for pass through to non-Federal governmental organizations or nonprofit organizations to rehabilitate eligible HHPDs that fail to meet minimum state dam safety standards and pose an unacceptable risk to life and property. The Chattooga Lake Club is a private organization, as is the dam in consideration. • Eligible applicants may choose to sponsor a privately-owned dam solely at its own discretion and at its own risk. • DES is in the process of applying for the FFY24 grant and, if receiving funds, will offer subawards to eligible applicants for activities that promote the goals of the federal grant program. • A privately-owned dam may be eligible, but the owner cannot apply directly. A non-federal government (i.e., state, county, municipal) or a 501(c)(3) non-profit organization are the only entities eligible to apply. • Subawards require a match of at least 35% in the form of non-federal funds and/or in-kind services. • The tentative deadline to submit application to DES is November 1, 2024. • All applicable federal standards and requirements must be satisfied for the awarded HHPD grant and any subawards. Failure to comply with federal grant requirements in the execution of a grant award may result in termination of the grant agreement and collection of some or all federal funds received. • Oconee County, as the applicant, is responsible for meeting all match / grant requirements, including procurement, records management, and legal fees if Chattooga Lake Club is unable to meet the requirements. SPECIAL CONSIDERATIONS OR CONCERNS [only if applicable]: FINANCIAL IMPACT [Brief Statement]: • The estimated costs for the project total $1,165,000. • If awarded, Chattooga Lake Club will provide a 39% non-federal match to meet the requirements under the grant program. Any costs above the estimated amount will also be the responsibility of Chattooga Lake Club. • The grant requires a legally enforceable covenant or agreement between the dam owner and Oconee County, the local government with jurisdictional authority under the National Flood Insurance Program that ensures that the feature will be maintained by the eligible subrecipient or state if not maintained according to the Operation and Maintenance Plan by the dam owner. • Oconee County legal support will be required to draw up the legally enforceable covenant or agreement. • A licensed Professional Engineer (PE) registered in South Carolina must assist in the preparation of your subaward grant application. • Engineering services funded from a HHPD grant must be procured in compliance with all federal and state procurement requirements and the applicant’s own procurement policies. ATTACHMENTS: Chattooga Lake Club submitted budget Chattooga Lake Club Request for Support FY 2024 Rehabilitation of High Hazard Potential Dams (HHPD) Notice of Funding Opportunity Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. STAFF RECOMMENDATION [Brief Statement]: It is the staff’s recommendation that Council consider the submission of the FY 2024 National Dam Safety Program Rehabilitation of High Hazard Potential Dam (HHPD) grant application to the South Carolina Department of Environmental Services. Prepared by: Approved for Submittal to Council: __________________________ _____________________________________ Brittney Martin, Grants Administrator Amanda F. Brock, County Administrator Chattooga Lake Dam, located in Mountain Rest, SC, will install a new primary spillway system including an intake structure and main drain. The original spillway system is deteriorating and no longer meets current regulatory safety standards. To mitigate against dam failure, the original system will be sealed after the new primary system is completed. This project will protect downstream population, structures and infrastructure from potential flooding, while protecting the water source for firefighting resources, recreational use and wildlife. In working with Oconee County, SC as the Subrecipient, Chattooga Lake Club applied for and received Project Scoping High Hazard Potential Dam (HHPD) grant funds to cover the costs of engineering studies and design. Memorandum of Understanding (MOU) between Oconee County and Chattooga Lake Club was approved November 4, 2022. Sub Award Agreement between SC Department of Health and Oconee County, SC Agreement # EQ-3-591 was approved January 6, 2023. The new primary spillway system has been recommended as a long-term solution by Howard Leonard P .E., Peritus Civil, Inc. Chattooga Lake Club is requesting Oconee County’s support as Subrecipient to apply for HHPD grant funds for the construction phase, including: 1. Operations and Maintenance Plan legally enforceable covenant or agreement between County and Chattooga Lake Club 2. Floodplain Management PLAN developed for Chattooga Lake Dam no later than 1 year after award agreement and implemented no later than 1 year after project completion 3. Assurance Statements/Certifications 4. Solicit bids following County Procurement Policy Estimated costs for the project are $1,165MM. If awarded, Chattooga Lake Club will provide Non-Federal Cost Share of 39% and FEMA will provide the balance. 1 The Department of Homeland Security (DHS) Notice of Funding Opportunity (NOFO) Fiscal Year 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) SUMMARY OVERVIEW OF KEY INFORMATION FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) REHABILITATION OF HIGH HAZARD POTENTIAL DAMS (HHPD) Program The Rehabilitation of High Hazard Potential Dams (HHPD) Grant Overview Program makes available federal funds to eligible states for pass through to non-Federal governmental organizations or nonprofit organizations for the rehabilitation of eligible high hazard potential dams that fail to meet minimum state dam safety standards and pose unacceptable risk to life and property. For the purposes of the HHPD Grant Program, rehabilitation means the repair, replacement, reconstruction, or removal of a dam to meet applicable state dam safety and security standards. The Fiscal Year 2024 Fall HHPD grant is available to support two categories of funding: (1) Project Scoping, Engineering and Design and (2) Construction Projects. Goals and Objective Reduce or eliminate risk of eligible high hazard potential dams. The HHPD grant program incentivizes eligible states to: • Provide financial assistance for repair, removal, or rehabilitation of eligible high hazard potential dams. • Incorporate risk-informed analysis and decision making into their dam safety practice and HHPD rehabilitation investments. • Incorporate risk-analysis results and information and consider all dam risk in state, local, Tribal, and territorial mitigation planning. • Promote community preparedness by requiring recipients to develop and implement floodplain management plans that address potential measures, practices, and policies to reduce loss of life, injuries, damage to property and facilities, public expenditures, and other adverse effects of flooding. • Reduce costs associated with dam rehabilitation through the deployment of innovative solutions and technologies. Eligible Projects HHPD grants assistance to high hazard dams listed in the National Inventory of Dams with a condition assessment of Poor or FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 2 Unsatisfactory and dams in Fair condition with a population at risk (PAR) at or above one thousand. HHPD funds the following activities: • Rehabilitation (Repair, Replacement, Reconstruction, or Removal) of eligible high hazard potential dams • Any other structural or nonstructural measures to rehabilitate an eligible high hazard potential dam. At project sites where Bipartisan Infrastructure Law (BIL) funding is being used for hazard mitigation projects, the use of public signage is a way to inform taxpayers about how BIL funds are being spent and advance the goals of accountability and transparency in federal spending. For more information on the federal government’s signage initiative relating to infrastructure investments, see the Office of Management and Budget’s February 24, 2023, Controller Alert, “CA - 23-6, Enhancing Transparency Through Use of the Investing in America Emblem on Signs (UPDATED).” OMB’s Controller Alert. If an HHPD applicant does not have a state mitigation plan that includes all dam risks, the applicant may request an extension to meet this requirement. (See Section H.13., Mitigation Plan Requirement Extension Requests). Additionally, for construction projects that are not funded by the BIL, publicly visible signage identifying the NDSP / HHPD funding source of the project promotes public awareness, participation in the program, and investment in building a resilient nation. Deadlines NOFO Availability Window Start Date: 11/06/2023 09:00:00 AM ET NOFO Availability Window End Date: 02/29/2024 Applicant Eligibility Period Start Date: Period of Performance starts when grant is awarded (signed, obligated, and notified to recipient) Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET Funding Amount Available Funding for the NOFO: $185,120,000.00 Eligible Applicants • States • District of Columbia • U.S. territories Cost Share Assistance provided under the HHPD grant is subject to a non-Federal cost-sharing requirement of not less than 35 percent. Federal funding is available for up to 65 percent of the eligible activity costs. The remaining 35 percent of eligible activity costs must be derived from non-federal sources, which may be in-kind. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 3 Requirements for cash and third-party in-kind contributions can be found in 2 Code of Federal Regulations § 200.306. The non-Federal cost share contribution is not limited to 35 percent. All entities wishing to do business with the federal government must have a unique entity identifier (UEI). The UEI number is issued by the system. Requesting a UEI using Sam.gov can be found at: Grants.gov registration information can be found at: https://www.grants.gov/web/grants/register.html. Planned UEI Updates in Grant Application Forms: On April 4, 2022, the Data Universal Numbering System (DUNS) Number was replaced by a new, non-proprietary identifier requested in, and assigned by, the System for Award Management (SAM.gov). This new identifier is the Unique Entity Identifier (UEI). Additional Information can be found on Grants.gov: https://www.grants.gov/web/grants/forms/planned-uei-updates.html Contents Planned UEI Updates in Grant Application Forms: ....................................................................... 3 A. Program Description................................................................................................................ 7 1. Issued By.......................................................................................................................... 7 2. Assistance Listings Number ............................................................................................ 7 3. Assistance Listings Title.................................................................................................. 7 4. Funding Opportunity Title ............................................................................................... 7 5. Funding Opportunity Number.......................................................................................... 7 6. Authorizing Authority for Program ................................................................................. 7 7. Appropriation Authority for Program.............................................................................. 7 8. Announcement Type........................................................................................................ 7 9. Program Category ............................................................................................................ 7 10. Program Overview, Objectives, and Priorities ................................................................ 7 11. Performance Measures..................................................................................................... 9 B. Federal Award Information ..................................................................................................... 9 1. Available Funding for the NOFO: $185,120,000.00...................................................... 9 2. Projected Number of Awards: 50 ................................................................................ 10 3. Period of Performance: 36 Months ............................................................................ 10 4. Funding Instrument Type: Grant .................................................................... 10 C. Eligibility Information........................................................................................................... 10 1. Eligible Applicants......................................................................................................... 10 2. Applicant Eligibility Criteria ......................................................................................... 10 3. Subrecipient Eligibility Criteria..................................................................................... 11 4. Other Program-Specific Eligibility Criteria................................................................... 12 5. Cost Share or Match....................................................................................................... 15 D. Application and Submission Information.............................................................................. 16 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 4 1. Key Dates and Times..................................................................................................... 16 a. Application Start Date: 11/06/2023 at 09:00:00 AM ET ...................................... 16 b. Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET ....................... 16 c. Anticipated Funding Selection Date: No later than 03/25/2024 .......................... 17 d. Anticipated Award Date: No later than 04/08/2024 ............................................. 17 e. Other Key Dates ........................................................................................................ 17 2. Agreeing to Terms and Conditions of the Award.......................................................... 17 3. Address to Request Application Package ...................................................................... 17 4. Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award Management (SAM), and Submit an Application ......................................................... 17 5. Electronic Delivery ........................................................................................................ 19 6. How to Register to Apply .............................................................................................. 19 a. General Instructions: ................................................................................................. 19 b. Obtain a UEI Number: .............................................................................................. 19 c. Obtain Employer Identification Number:.................................................................. 19 d. Create a login.gov account: ....................................................................................... 20 e. Register with SAM:................................................................................................... 20 f. Register in FEMA GO, Add the Organization to the System, and Establish the AOR: 21 7. Submitting the Application............................................................................................ 21 8. Timely Receipt Requirements and Proof of Timely Submission .................................. 21 9. Content and Form of Application Submission............................................................... 22 a. Standard Required Application Forms and Information ........................................... 22 b. Program-Specific Required Forms and Information ................................................. 23 10. Other Submission Requirements.................................................................................... 24 11. Intergovernmental Review............................................................................................. 25 12. Funding Restrictions and Allowable Costs.................................................................... 25 a. Requirements Related to Contractor and Subcontractor Wages ............................... 26 b. Requirements Related to Contract and Subcontract Services ................................... 26 c. Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services ................................................................................................... 26 d. Enhancing Critical Infrastructure Cybersecurity....................................................... 28 e. Pre-Award Costs........................................................................................................ 28 f. Management and Administration (M&A) Costs ....................................................... 28 g. Indirect Facilities & Administrative (F&A) Costs .................................................... 28 E. Application Review Information........................................................................................... 29 1. Application Evaluation Criteria ..................................................................................... 29 a. Programmatic Criteria for Mitigation Plan Requirement.......................................... 29 b. Financial Integrity Criteria ........................................................................................ 30 c. Supplemental Financial Integrity Criteria and Review ............................................. 31 2. Review and Selection Process ....................................................................................... 31 F. Federal Award Administration Information.......................................................................... 32 1. Notice of Award............................................................................................................. 32 2. Pass-Through Requirements .......................................................................................... 32 3. Administrative and National Policy Requirements........................................................ 33 a. DHS Standard Terms and Conditions ....................................................................... 33 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 5 b. Ensuring the Protection of Civil Rights .................................................................... 33 c. Environmental Planning and Historic Preservation (EHP) Compliance................... 34 d. Good Jobs .................................................................................................................. 35 4. Reporting........................................................................................................................ 35 a. Financial Reporting Requirements............................................................................ 36 b. Programmatic Performance Reporting Requirements ............................................... 36 c. Closeout Reporting Requirements............................................................................. 37 d. Additional Reporting Requirements .......................................................................... 39 5. Monitoring and Oversight.............................................................................................. 40 G. DHS Awarding Agency Contact Information ....................................................................... 41 1. Contact and Resource Information ................................................................................ 41 a. Program Office Contact............................................................................................. 41 FEMA Grants News....................................................................................................... 41 c. Grant Programs Directorate (GPD) Award Administration Division ....................... 41 d. FEMA Regional Offices ............................................................................................ 42 e. Equal Rights .............................................................................................................. 43 f. Environmental Planning and Historic Preservation .................................................. 43 2. Systems Information ...................................................................................................... 43 a. Grants.gov ................................................................................................................. 43 b. Payment and Reporting System (FEMA GO) ........................................................... 43 c. FEMA Grant Outcomes (GO) ................................................................................... 43 H. Additional Information.......................................................................................................... 44 I. Termination Provisions.................................................................................................. 44 a. Noncompliance.......................................................................................................... 44 b. With the Consent of the Recipient ............................................................................ 44 c. Notification by the Recipient .................................................................................... 44 2. Program Evaluation.......................................................................................................... 44 3. Period of Performance Extensions................................................................................. 45 4. Disability Integration....................................................................................................... 46 5. Conflicts of Interest in the Administration of Federal Awards or Subawards............... 47 6. Procurement Integrity .................................................................................................... 47 a. Important Changes to Procurement Standards in 2 C.F.R. Part 200 ......................... 48 b. Competition and Conflicts of Interest ....................................................................... 48 c. Supply Schedules and Purchasing Programs............................................................. 50 d. Procurement Documentation ..................................................................................... 51 7. FEMA Financial Assistance Programs for Infrastructure ................................................ 52 Build America, Buy America Act.................................................................................. 52 8. Record Retention ........................................................................................................... 53 a. Record Retention Period ........................................................................................... 53 b. Types of Records to Retain ....................................................................................... 54 9. Actions to Address Noncompliance............................................................................... 55 10. Audits............................................................................................................................. 56 11. Payment Information ..................................................................................................... 57 12. Whole Community Preparedness................................................................................... 57 13. Example Mitigation Plan Extension Request Template.................................................. 58 14. Examples Using Funding Formula.................................................................................. 59 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 6 15. Determination of Unacceptable Risk to the Public ......................................................... 61 16. Eligible Activities............................................................................................................ 61 17. Floodplain Management Plan.......................................................................................... 63 18. Definitions ....................................................................................................................... 65 19. Appendices ..................................................................................................................... 67 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 7 A. Program Description 1. Issued By U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA)/ Resilience, Risk Management Directorate/Planning, Safety and Building Science Division / Planning and Safety Branch, National Dam Safety Program Office (NDSP) 2. Assistance Listings Number 97.041 3. Assistance Listings Title National Dam Safety Program 4. Funding Opportunity Title Fiscal Year 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) 5. Funding Opportunity Number DHS-24-[MT]-[041]-[00]-[98] 6. Authorizing Authority for Program National Dam Safety Program Act (Public Law No. 92-367, as amended, 33 U.S.C. § 467f-2) 7. Appropriation Authority for Program Infrastructure Investment and Jobs Act, Division J, Title V, Protection, Preparedness, Response, and Recovery, Federal Emergency Management Agency, Federal Assistance (Public Law No. 117-58) 8. Announcement Type Initial 9. Program Category Mitigation 10. Program Overview, Objectives, and Priorities a. Overview FEMA’s National Dam Safety Program (NDSP) is committed to protecting lives and property from the risks associated with dams. Under NDSP, the Rehabilitation of High Hazard Potential Dams (HHPD) Grant Program makes available federal funds to eligible states for pass through to non-Federal governmental organizations or nonprofit organizations for the rehabilitation of eligible high hazard potential dams that fail to meet minimum state dam safety standards and pose unacceptable risk to life and property. For the purposes of the HHPD Grant Program, rehabilitation means the repair, replacement, reconstruction, or removal of a dam that is carried out to meet applicable state dam safety and security standards. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 8 The Fiscal Year 2024 Fall HHPD grant is available to support two categories of funding: (1) Project Scoping, Engineering and Design and (2) Construction Projects. The HHPD grant program incentivizes eligible states to: • Provide financial assistance for repair, removal, or rehabilitation of eligible high hazard potential dams. • Incorporate risk-informed analysis and decision making into their dam safety practice and HHPD rehabilitation investments. • Incorporate risk-analysis results and information and consider all dam risk in state, local, tribal, and territorial mitigation planning. • Promote community preparedness by requiring recipients to develop and implement floodplain management plans that address potential measures, practices, and policies to reduce loss of life, injuries, damage to property and facilities, public expenditures, and other adverse effects of flooding. • Reduce costs associated with dam rehabilitation through the deployment of innovative solutions and technologies. Given the requirements of this grant (e.g., National Flood Insurance Program participation, state, and local hazard mitigation plans (HMP), floodplain management plan, risk prioritization, state dam safety agency approval of the award), applicants must pursue this grant in coordination with the State Dam Safety Officer and the State Hazard Mitigation Officer, regardless of which entity will implement the grant. Contact information for the State Hazard Mitigation Officers (SHMOs) is provided on the FEMA website at http://www.fema.gov/state-hazard-mitigation-officers. The HHPD supports DHS Strategic Goal 5: Strengthen Preparedness and Resilience, Objective 5.1: Build a National Culture of Preparedness and Presidential Policy Directive 8: Build and Sustain National Preparedness. Specifically, the HHPD supports Sub-Objective 5.1.1 of Strategic Goal 5 to incentivize investments that reduce risk and increase pre-disaster mitigation, including expanding the use of insurance to manage risk. DHS Strategic Plan, Fiscal years 2020-2024 has identified strengthening national preparedness and resilience as one of the basic Homeland Security missions. This initiative supports this mission by providing grant assistance for eligible high hazard potential dams that pose an unacceptable risk to the public. This program also supports Goal 2: Lead Whole of Community in Climate Resilience, Objective 2.3, Empower Risk-Informed Decision Making, of the 2022-2026 FEMA Strategic Plan. b. Objectives The objective of the program is to: Reduce or eliminate risk of eligible high hazard potential dams. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 9 c. Priorities For FY2024, the HHPD priorities are Rehabilitation Planning, Design, Re-construction, and Removal activities for eligible high hazard dams. 11. Performance Measures The following list provides Performance Measures aligned with Program Objectives and associated eligible activities. Applicants may choose one or more activities from the list below. Applicants may propose additional activities to support the program objectives; however, applicants must discuss additional activities with the FEMA Program Officer for approval and inclusion into the workplan. Program Objective: Reduce or eliminate risk of eligible high hazard potential dam (HHPD) Performance Measures 1.1 Planning tasks and activities, studies and analysis for pre-construction phases, scoping activities, and permit applications. Performance Measure 1.1: Number of eligible HHPD dams that have resulted in the completion of studies and analysis for pre-construction phases, scoping activities, and permit applications. 1.2 Preliminary and final design package and required permit approvals. Performance Measure 1.2: Number of eligible HHPD dams that have resulted in the completion of preliminary and final engineering design package and permits. 1.3 Construction activities that support dam rehabilitation or removal projects. Performance Measure 1.3: Number of eligible HHPD dams that result in construction projects for dam rehabilitation or removal. Applicants are to establish Performance Measurement targets for activities submitted for funding under this award. See Appendix A: FY24 Performance Measure Targets. B. Federal Award Information 1. Available Funding for the NOFO: $185,120,000.00 The allocation of available HHPD grant funds is determined by 33 U.S.C § 467f- 2(g)(2) Allocation of Funds. The allocation of the HHPD funds is calculated as follows: (i) Equal distribution One-third of the available funding will be distributed equally among states FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 10 in which the projects for which eligible applications are submitted are located. (ii) Need-based Two-thirds of the available funding will be distributed among states in which the projects for which eligible applications are submitted are located based on the proportion that: a. the number of eligible high hazard potential dams in the state; bears to b. the number of eligible high hazard potential dams in all such states. 2. Projected Number of Awards: 50 3. Period of Performance: 36 Months The Period of Performance (POP) is 36 months, starting on the date of the Recipient’s federal award. Given the complexity of the HHPD projects, the Recipient may submit a request for an extension to the period of performance, which is allowed under HHPD. For additional information on period of performance extensions, please refer to Section H.3, Period of Performance Extensions. FEMA awards under most programs, including this program, only include one budget period, so it will be same as the period of performance. See 2 Code of Federal Regulations § 200.1 for definitions of “budget period” and “period of performance.” 4. Funding Instrument Type: Grant C. Eligibility Information 1. Eligible Applicants A state with a state dam safety program authorized by state legislation is the only entity eligible to submit HHPD applications to DHS/FEMA. For the purposes of the HHPD, the term “state” means each of the several states of the United States, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, the Commonwealth of the Northern Mariana Islands, and any other territory or possession of the United States. 2. Applicant Eligibility Criteria Each eligible state must designate one State Administrative Agency (SAA) to serve as the applicant for HHPD funding. Each SAA may submit only one (1) HHPD grant application to FEMA and be able to comply with regulations associated with receipt of federal financial contributions from FEMA. Each Recipient must have a FEMA-approved state mitigation plan that includes all dam risks; and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552) that amended the Robert T. Stafford Disaster Relief and Emergency Assistance Act, FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 11 PL 100-707. For more information on the Mitigation Plan Requirements, see Section E.1.a, Programmatic Criteria for Mitigation Plan Requirement. For links to mitigation plan guidance documents and for questions, see Section H.12., Mitigation Plan Requirement Resources. 3. Subrecipient Eligibility Criteria Eligible subrecipients under Fiscal Year 2024 HHPD are non-federal governmental organizations (other than the designated applicant) and nonprofit organizations. Under FY 2024 HHPD, eligible subrecipients apply for and receive subawards directly from the SAA. Subrecipients must meet the following criteria to be eligible: a. Acts in accordance with the state dam safety program. Additionally, the project dam must be regulated by the state dam safety program. All activities must be approved by the state dam safety agency. Any engineering studies, plans, or design drawings and specifications must be approved, signed, and stamped by a qualified design professional registered in the state in which the project is located. b. The community in which the dam is located participates in, and complies with, all applicable regulations of the National Flood insurance Program, and is in good standing, not on probation, suspended, or withdrawn from such Program. c. The Tribal or local government with jurisdiction over the area in which the dam is located has in place an approved hazard mitigation plan that includes all dam risks and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). For more information on the Mitigation Plan Requirements, see Section E.1.a., Programmatic Criteria for Mitigation Plan Requirement. If the Tribal or local mitigation plan does not include all dam risks, the subrecipient may request an extension to meet this requirement. For more information on the Mitigation Plan Requirements, see Section H.13, Mitigation Plan Requirement Extension Requests. For links to mitigation plan guidance documents and for questions, see Section H.12., Mitigation Plan Requirement Resources. (FEMA’s Mitigation Planning Program defines “local government” as any county, municipality, city, town, township, public authority, school district, special district, intrastate district, council of governments (regardless of whether the council of governments is incorporated as a nonprofit corporation under State law), regional or interstate government entity, or agency or instrumentality of a local government; any Indian tribe or authorized tribal organization, or Alaska Native village or organization; and any rural community, unincorporated town or village, or other public entity” (44 Code of Federal Regulations § 201.2).) d. Commit to provide operation and maintenance of the project for the expected life of the dam following completion of rehabilitation. e. Carries out activities relating to the public in the area around the dam in accordance with the hazard mitigation plan. f. Complies with section 5196(j)(9) of title 42 of the U.S. Code (as in effect on December 16, 2016) with respect to projects receiving assistance under this section in the same manner as FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 12 recipients are required to comply in order to receive financial contributions from the Administrator for emergency preparedness purposes. See Section D.13.a., Requirements Related to Contractor and Subcontractor Wages, for additional information. g. Complies with chapter 11 of the title 40, Selection of Architects and Engineers. (See Section D.13.b., Requirements Related to Contract and Subcontract Services.) h. Have in place (or will be developed not later than 2 years after the date of execution of a dam rehabilitation or removal project agreement and implemented not later than 2 years after the date of completion of a project) a floodplain management plan to reduce the impacts of future flood events in the area impacted by the project. The floodplain management plan shall address: 1. potential measures, practices, and policies to reduce loss of life, injuries, damage to property and facilities, public expenditures, and other adverse impacts of flooding in the area protected by the project. 2. plans for flood fighting and evacuation; and 3. public education and awareness of flood risks. For additional information, please see Section H.17., Floodplain Management Plan. i. For the purposes of the HHPD program, all dam risk includes the incremental risk, non- breach risk, and residual risk associated with each eligible high hazard potential dam, as well as the reason(s) the state has determined the dam is an eligible high hazard potential dam. For the purposes of meeting the mitigation planning requirements, Applicants (SAA) must address the requirements for state mitigation plans and subrecipients / jurisdictions where the dam is located must address the requirements for local or tribal mitigation plans as set forth in mitigation planning policies. The requirements include the planning process, risk assessment, goals, and mitigation strategy. In the mitigation planning risk assessment, including all dam risks is done at a scale appropriate to the planning area and should include descriptions of incremental, breach, and non-breach risks for high hazard potential dams (not limited to eligible) as described in Section 5.8 of the Rehabilitation of High Hazard Potential Dams Grant Program Guidance (June 2020) FEMA Policy FP 104-008-7. “ j. Bipartisan Infrastructure Law (BIL) Signage FEMA encourages the use of public signage for Bipartisan Infrastructure Law funded projects. Please note, these actions highly are encouraged but are not required. Subrecipients are encouraged to place signs at project sites identifying the funding source of the project. The cost of such signs is an eligible project cost. Sub applicants may request up to $10,000 per project for costs relating to signage. Project costs for signage are subject to the applicable cost-sharing requirements. For assistance with template design, please email: design@fema.dhs.gov. 4. Other Program-Specific Eligibility Criteria FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 13 a. Approved Hazard Mitigation Plan The state must have in place (by the application deadline and at the time of obligation of grant funds) an approved state hazard mitigation plan that includes all dam risks (See Section H.19., Definitions, for the definition of All Dam Risk) and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). If an HHPD applicant does not have a state mitigation plan that includes all dam risks, the applicant may request an extension to meet this requirement. (See Section H.13., Mitigation Plan Requirement Extension Requests). b. Allowable Activities See Section H.17., Eligible Activities, for more information on allowable activities. See Section D.13.b., Requirements Related to Contract and Subcontract Services, for information about funding restrictions. At project sites where BIL funding is being used for hazard mitigation projects, the use of public signage is a way to inform taxpayers about how BIL funds are being spent and advance the goals of accountability and transparency in federal spending. For more information on the federal government’s signage initiative relating to infrastructure investments, see the Office of Management and Budget’s February 24, 2023, Controller Alert, “CA-23-6, Enhancing Transparency Through Use of the Investing in America Emblem on Signs (UPDATED).” Additionally, for construction projects that are not funded by the BIL, publicly visible signage identifying the National Dam Safety Program HHPD funding source of the project promotes public awareness, participation in the program, and investment in building a resilient nation. c. List of Eligible High Hazard Dams The SAA must submit a list of all eligible high hazard potential dams in their state with the application. The SAA must submit an official assurance statement (signed by the State Dam Safety Officer or Governor's Authorized Representative [GAR]) that all dams included on the list of eligible high hazard potential dams are regulated by the state dam safety program and meet the following HHPD criteria for eligible high hazard potential dams. A dam considered as eligible under grant must meet the following criteria: “(A) In general, the term “eligible high hazard potential dam” means a non-Federal dam that— (i) is located within a state with a state dam safety program and regulated under that state dam safety program; (ii) is classified as high hazard potential by the relevant state dam safety agency; (iii) has an emergency action plan that— I. is approved by the relevant state dam safety agency; or II. is in conformance with state law and pending approval by the relevant state dam safety agency; (iv) fails to meet minimum dam safety standards of the state in which the dam is located, as determined by the state dam safety agency; FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 14 (v) and has a condition assessment rating of POOR or UNSATISFACTORY as identified in the National Inventory of Dams (NID) no later than 09/15/2023. (B) Exclusion The term “eligible high hazard potential dam” does not include— (i) a licensed hydroelectric dam under a hydropower project with an authorized installed capacity of greater than 1.5 megawatts; or (ii) a dam built under the authority of the Secretary of Agriculture.” 33 U.S.C. § 467(4)(A) Note: Dams with FAIR condition assessment in the NID (with a population at risk (PAR) of less than 1000) may be eligible for the HHPD program. See Section d. List of Eligible High Hazard Dams Template, below for more details. Dams with a SATISFACTORY or NOT RATED condition assessment in the NID are not eligible for the HHPD program. HHPD Prioritization Tool The FEMA project prioritization tool is an Excel-based tool developed specifically for the HHPD grants. This screening level tool requires input from the NID and data available from other state sources such as inspection reports. The tool assists in the estimation of the likelihood of failure for static, hydrologic, and seismic failure modes based on existing deficiencies and the change in likelihood of failure by removing the deficiencies and bringing the dam in compliance with state standards. The HHPD priority system process requires that dams under consideration for HHPD funding be plotted on a HHPD risk matrix with the likelihood of failure from the FEMA project prioritization tool on the vertical axis and the PAR calculated using the US Army Corps of Engineers Dam Screening Tool (DST) plotted on the horizonal axis of the risk matrix. Comparing the dams based on likelihood of failure and PAR consequences provide a ranking of dams consistent with the intent of the Act. If the SAA chooses to be a pass-through entity, the SAA must contact potential subrecipients to identify potential eligible subrecipients with an eligible dam who express interest in obtaining a grant for a specific planning or design project and are capable of meeting the requirements of the HHPD grant. See Section H.17., Eligible Activities, for information on Eligible Activities. The list or prospective eligible dams will be used to allocate grant funds to the state. See Section H.15., Example Using the Funding Formula, for a sample calculation on how eligible dams is used for state grant allocations. Upon request, the SAA must provide to FEMA substantiating documentation that documents dams submitted are eligible under the HHPD grant. The requested documentation may include, but is not limited to, copies of the regulatory notices, risk assessments, engineering analyses, etc. d. List of Eligible High Hazard Dams Template FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 15 The list of dams must be submitted in table format with NID Data and must include the below column row headers and must be signed by the State Dam Safety Agency or GAR: • Does the state have a state dam safety program? • Dam Name • NID ID • Longitude • Latitude • Hazard Potential • State Approved EAP? (Y/N) • EAP Date • Owner Type • Built by USDA/NRCS? (Y/N) • Licensed by FERC? (Y/N) • NID Condition Assessment* • Fails to Meet Minimum State Dam Safety Standards • Dam has a documented Dam Safety Deficiency? ** • Was Dam Safety Deficiency caused by lack of Routine Operation and Maintenance? • Was Dam Safety Deficiency caused by Deferred Maintenance? • Brief Description of Deficiency • Name of potential Subrecipient that has indicated interest in HHPD and is capable of meeting HHPD requirements*** * FEMA will review the Condition Assessment data reported in the NID to validate a dam’s eligibility on 09/15/2023. Dams that meet the NID criteria for POOR or UNSATISFACTORY condition assessments may be eligible to include on the list of eligible high hazard potential dams. Also dams that meet the NID criteria of FAIR and with a PAR greater than or equal to 1000 may be eligible. Upon request, the SAA must provide to FEMA substantiating documentation that verify dams submitted are eligible under the HHPD grant. The requested documentation may include, but is not limited to, copies of the regulatory notices, risk assessments, engineering analyses, etc. **Dam Safety Deficiency (Source NID): A load capacity limit or other issue that can result in a failure of the dam or appurtenant structure. It is a characteristic or condition that does not meet the applicable minimum regulatory criteria. *** the SAA must contact potential subrecipients to identify potential eligible subrecipients with an eligible dam who express interest in obtaining a grant for a specific planning or design project and are capable of meeting the requirements of the HHPD grant. (Only fill out this field if the potential subrecipient has been contacted or is the SAA.) 5. Cost Share or Match Assistance provided under the HHPD grant is subject to a non-Federal cost-sharing requirement of not less than 35 percent. Federal funding is available for up to 65 percent of the eligible activity costs. The remaining 35 percent of eligible activity costs must be derived from non- federal sources, which may be in-kind. Requirements for cash and third-party in-kind FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 16 contributions can be found in 2 Code of Federal Regulations § 200.306. The non-Federal cost share contribution is not limited to 65 percent. The non-federal cost share contribution is calculated based on the total cost of the proposed activity. The calculation to determine the non-Federal Cost share is: Non-Federal Share = [0.35*(Federal Share)]/(0.65). For example, if the total cost is $400,000 and the non-Federal cost share is 35 percent, then the non-federal contribution is $140,000: 35 percent of $400,000 is $140,000. The federal share cannot exceed $260,000 ($400,000 x 65%). D. Application and Submission Information 1. Key Dates and Times a. Application Start Date: 11/06/2023 at 09:00:00 AM ET b. Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET All applications must be received by the established deadline. FEMA’s Grants Outcomes System (FEMA GO) automatically records proof of timely submission and the system generates an electronic date/time stamp when FEMA GO successfully receives the application. The individual with the Authorized Organization Representative role that submitted the application will also receive the official date/time stamp and a FEMA GO tracking number in an email serving as proof of their timely submission. For additional information on how an applicant will be notified of application receipt, see the subsection titled “Timely Receipt Requirements and Proof of Timely Submission” in Section D of this NOFO. FEMA will not review applications that are received after the deadline or consider these late applications for funding. FEMA may, however, extend the application deadline on request for any applicant who can demonstrate that good cause exists to justify extending the deadline. Good cause for an extension may include technical problems outside of the applicant’s control that prevent submission of the application by the deadline, other exigent or emergency circumstances, or statutory requirements for FEMA to make an award. Applicants experiencing technical problems outside of their control must notify FEMA as soon as possible and before the application deadline. Failure to timely notify FEMA of the issue that prevented the timely filing of the application may preclude consideration of the award. “Timely notification” of FEMA means: prior to the application deadline and within 48 hours after the applicant became aware of the issue. A list of FEMA contacts can be found in Section G of this NOFO, “DHS Awarding Agency Contact Information.” For additional assistance using the FEMA GO System, please contact the FEMA GO Service Desk at 1-877-585-3242 or FEMAgo@fema.dhs.gov. The FEMA GO Service Desk is available Monday through Friday, 9:00 AM – 6:00 PM Eastern Time (ET). For programmatic or grants management questions, please contact your Program Analyst or Grants FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 17 Specialist. FEMA Grants News is a non-emergency comprehensive management and information resource developed by FEMA for grants stakeholders. This channel provides general information on all FEMA grant programs and maintains a comprehensive database containing key personnel contact information at the federal, state, and local levels. When necessary, recipients will be directed to a federal point of contact who can answer specific programmatic questions or concerns. FEMA Grants Information Desk can be reached by e-mail at fema-grants- news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9:00 AM – 5:00 PM ET. c. Anticipated Funding Selection Date: No later than 03/25/2024 d. Anticipated Award Date: No later than 04/08/2024 e. Other Key Dates Event Suggested Deadline for Completion Obtaining Unique Entity Identifier (UEI) number Four weeks before actual submission deadline Obtaining a valid Employer Identification Number (EIN) Four weeks before actual submission deadline Creating an account with login.gov Four weeks before actual submission deadline Registering in SAM or updating SAM registration Four weeks before actual submission deadline Registering Organization in FEMA GO Prior to beginning application Submitting complete application in FEMA GO One week before actual submission deadline 2. Agreeing to Terms and Conditions of the Award By applying, applicants agree to comply with the requirements of this NOFO and the terms and conditions of the award, should they receive an award. 3. Address to Request Application Package Applications are processed through the FEMA GO system. To access the system, go to https://go.fema.gov/. Hard copies of the NOFO can be downloaded at Grants.gov or obtained via email from the Awarding Office points of contact listed in Section G of this NOFO, “DHS Awarding Agency Contact Information” or by TTY (800) 462-7585. 4. Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award Management (SAM), and Submit an Application FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 18 Applying for an award under this program is a multi-step process and requires time to complete. Applicants are encouraged to register early as the registration process can take four weeks or more to complete. Therefore, registration should be done in sufficient time to ensure it does not impact your ability to meet required submission deadlines. Requirements: Obtain a Unique Entity Identifier (UEI) and Register in the System for Award Management (SAM) Each applicant, unless they have a valid exception under 2 CFR 25.110, must: 1) Be registered in Sam.Gov before application submission. 2) Provide a valid Unique Entity Identifier (UEI) in its application. 3) Continue to always maintain an active System for Award Management (SAM) registration with current information during the Federal Award process. " Please review the table above for estimated deadlines to complete each of the steps listed. Failure of an applicant to comply with any of the required steps before the deadline for applying may disqualify that application from funding. To apply for an award under this program, all applicants must: a. Apply for, update, or verify their Unique Entity Identifier (UEI) number and Employer Identification Number (EIN) from the Internal Revenue Service; b. In the application, provide an UEI number; c. Have an account with login.gov; d. Register for, update, or verify their SAM account and ensure the account is active before submitting the application; e. Register in FEMA GO, add the organization to the system, and establish the Authorized Organizational Representative (AOR). The organization’s electronic business point of contact (eBiz POC) from the SAM registration may need to be involved in this step. For step-by-step instructions, see https://www.fema.gov/media- library/assets/documents/181607; f. Submit the complete application in FEMA GO; and g. Continue to maintain an active SAM registration with current information at all times during which it has an active federal award or an application or plan under consideration by a federal awarding agency. As part of this, applicants must also provide information on an applicant’s immediate and highest-level owner and subsidiaries, as well as on all predecessors that have been awarded federal contracts or federal financial assistance within the last three years, if applicable. Applicants are advised that FEMA may not make a federal award until the applicant has complied with all applicable SAM requirements. Therefore, an applicant’s SAM registration must be active not only at the time of application, but also during the application review period and when FEMA is ready to make a federal award. Further, as noted above, an applicant’s or recipient’s SAM registration must remain active for the duration of an active federal award. If an applicant’s SAM registration is expired at the time of application, expires during application review, or expires any other time before award, FEMA may determine FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 19 that the applicant is not qualified to receive a federal award and use that determination as a basis for making a federal award to another applicant. Per 2 C.F.R. § 25.110(c)(2)(iii), if an applicant is experiencing exigent circumstances that prevents it from obtaining an UEI number and completing SAM registration prior to receiving a federal award, the applicant must notify FEMA as soon as possible by contacting FireGrants@fema.dhs.gov and providing the details of the circumstances that prevent completion of these requirements. If FEMA determines that there are exigent circumstances and FEMA has decided to make an award, the applicant will be required to obtain an UEI number, if applicable, and complete SAM registration within 30 days of the federal award date. 5. Electronic Delivery DHS is participating in the Grants.gov initiative to provide the grant community with a single site to find and apply for grant funding opportunities. DHS encourages or requires applicants to submit their applications online through Grants.gov, depending on the funding opportunity. For this funding opportunity, FEMA requires applicants to submit applications through FEMA GO. 6. How to Register to Apply a. General Instructions: Registering and applying for an award under this program is a multi-step process and requires time to complete. Read the instructions below about registering to apply for FEMA funds. Applicants should read the registration instructions carefully and prepare the information requested before beginning the registration process. Reviewing and assembling the required information before beginning the registration process will alleviate last-minute searches for required information. The registration process can take up to four weeks to complete. To ensure an application meets the deadline, applicants are advised to start the required steps well in advance of their submission. Organizations must have a Unique Entity Identifier (UEI) number, Employer Identification Number (EIN), and an active System for Award Management (SAM) registration. b. Obtain a UEI Number: All entities applying for funding, including renewal funding, must have a UEI number. Applicants must enter the UEI number in the applicable data entry field on the SF-424 form. For more detailed instructions for obtaining a UEI number, refer to SAM.gov. c. Obtain Employer Identification Number: In addition to having a UEI number, all entities applying for funding must provide an Employer Identification Number (EIN). The EIN can be obtained from the IRS by visiting https://www.irs.gov/businesses/small-businesses-self-employed/apply-for-an-employer- identification-number-ein-online. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 20 d. Create a login.gov account: Applicants must have a login.gov account in order to register with SAM or update their SAM registration. Applicants can create a login.gov account here: https://secure.login.gov/sign_up/enter_email?request_id=34f19fa8-14a2-438c-8323- a62b99571fd. Applicants only have to create a login.gov account once. For applicants that are existing SAM users, use the same email address for the login.gov account as with SAM.gov so that the two accounts can be linked. For more information on the login.gov requirements for SAM registration, refer to https://www.sam.gov/SAM/pages/public/loginFAQ.jsf. e. Register with SAM: In addition to having a UEI number, all organizations must register with SAM. Failure to register with SAM will prevent your organization from applying through FEMA GO. SAM registration must be renewed annually and must remain active throughout the entire grant life cycle. For more detailed instructions for registering with SAM, refer to https://www.grants.gov/web/grants/applicants/organization-registration/step-2-register-with- sam.html. Note: As a new requirement per 2 C.F.R. § 25.200, applicants must also provide the applicant’s immediate and highest-level owner, subsidiaries, and predecessors that have been awarded federal contracts or federal financial assistance within the past three years, if applicable. I. ADDITIONAL SAM REMINDERS Existing SAM.gov account holders should check their account to make sure it is “ACTIVE.” SAM registration should be completed at the very beginning of the application period and should be renewed annually to avoid being “INACTIVE.” Please allow plenty of time before the grant application submission deadline to obtain a UEI number and then to register in SAM. It may be four weeks or more after an applicant submits the SAM registration before the registration is active in SAM, and then it may be an additional 24 hours before FEMA’s system recognizes the information. It is imperative that the information applicants provide is correct and current. Please ensure that your organization’s name, address, UEI number, and Employer Identification Number, or EIN, are up to date in SAM and that the UEI number used in SAM is the same one used to apply for all other FEMA awards. Payment under any FEMA award is contingent on the recipient’s having a current SAM registration. II. HELP WITH SAM FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 21 The SAM quick start guide for new recipient registration and SAM video tutorial for new applicants are tools created by the General Services Administration (GSA) to assist those registering with SAM. If applicants have questions or concerns about a SAM registration, please contact the Federal Support Desk at https://www.fsd.gov/fsd-gov/home.do or call toll free (866) 606-8220 Monday - Friday 8 a.m. to 8 p.m. ET. f. Register in FEMA GO, Add the Organization to the System, and Establish the AOR: Applicants must register in FEMA GO and add their organization to the system. The organization’s electronic business point of contact (eBiz POC) from the SAM registration may need to be involved in this step. For step-by-step instructions, see FEMA GO Startup Guide. Note: FEMA GO will support only the most recent major release of the following browsers: • Google Chrome; • Internet Explorer; • Mozilla Firefox; • Apple Safari; and • Microsoft Edge. Users who attempt to use tablet type devices or other browsers may encounter issues with using FEMA GO. 7. Submitting the Application Applicants will be prompted to submit the standard application information and any program-specific information required as described in Section D.10 of this NOFO, “Content and Form of Application Submission.” The Standard Forms (SF) may be accessed in the Forms tab under the SF-424 family on Grants.gov. Applicants should review these forms before applying to ensure they have all the information required. After submitting the application, FEMA GO will provide either an error message or a successfully received transmission in the form of an email sent to the Authorized Organization Representative that submitted the application. Applicants using slow internet connections, such as dial-up connections, should be aware that transmission can take some time before FEMA GO receives your application. For additional application submission requirements, including program-specific requirements, please refer to the subsection titled “Content and Form of Application Submission” under Section D of this NOFO. 8. Timely Receipt Requirements and Proof of Timely Submission All applications must be completed in FEMA GO by the application deadline. FEMA GO automatically records proof of timely submission and the system generates an electronic date/time stamp when FEMA GO successfully receives the application. The individual with FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 22 the Authorized Organization Representative (AOR) role that submitted the application will also receive the official date/time stamp and a FEMA GO tracking number in an email serving as proof of their timely submission on the date and time that FEMA GO received the application. Applicants who experience system-related issues will be addressed until 3:00 PM ET on the date applications are due. No new system-related issues will be addressed after this deadline. Applications not received by the application submission deadline will not be accepted. 9. Content and Form of Application Submission a. Standard Required Application Forms and Information The following forms or information are required to be submitted via FEMA GO. The Standard Forms (SF) are also available at https://www.grants.gov/web/grants/forms/sf-424- family.html. ￿ SF-424, Application for Federal Assistance ￿ Grants.gov Lobbying Form, Certification Regarding Lobbying ￿ SF-424A, Budget Information (Non-Construction) • For construction under an award, submit SF-424C, Budget Information (Construction), in addition to or instead of SF-424A ￿ SF-424B, Standard Assurances (Non-Construction) • For construction under an award, submit SF-424D, Standard Assurances (Construction), in addition to or instead of SF-424B ￿ SF-LLL, Disclosure of Lobbying Activities ￿ Indirect Cost Agreement or Proposal if the budget includes indirect costs and the applicant is required to have an indirect cost rate agreement or proposal. If the applicant does not have or is not required to have an indirect cost rate agreement or proposal, please see Section D.13 of this NOFO, “Funding Restrictions and Allowable Costs,” for further information regarding allowability of indirect costs and whether alternatives to an indirect cost rate agreement or proposal might be available, or contact the relevant FEMA staff identified in Section G of this NOFO, “DHS Awarding Agency Contact Information” for further instructions. Generally, applicants have to submit either the non-construction forms (i.e., SF-424A and SF-424B) or construction forms (i.e., SF-424C and SF-424D), meaning that applicants that only have construction work and do not have any non-construction work need only submit the construction forms (i.e., SF-424C and SF-424D) and not the non-construction forms (i.e., SF-424A and SF-424B), and vice versa. However, applicants who have both construction and non-construction work under this program need to submit both the construction and non- construction forms. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 23 b. Program-Specific Required Forms and Information The following program-specific forms or information are required to be submitted in National Dam Safety Rehabilitation of High Hazard Potential Dams grant: Contact your NDSP Program Officer for templates to submit Program-Specific Information. The following program-specific forms or information are required to be submitted in: The SAA must include the following five documents in the initial application package—each document must be labeled and numbered. At the top of each document provide the following: • State/Agency Name • FY24 FALL HHPD • Name and contact information (completing documents) • Date The following program-specific forms or information are required to be submitted in FEMA GO: 1. List of eligible high hazard potential dams, including National Inventory of Dams (NID) ID Identifiers, in their state with the application. The SAA or GAR should sign a statement that the list of eligible high hazard potential dams has been reviewed and approved. See Section C.4.c., List of Eligible High Hazard Potential Dams, for eligibility requirements and Section C.4.d., List of Eligible High Hazard Potential Dams Template, for an example table template for submittal. 2. Proposed Budget and HHPD proposed projects/activities: Indicate and describe proposed activities: (1) project scoping and engineering design, and or (2) construction (clearly indicate if project includes repair, rehabilitation, or removal). Include a brief project narrative on how the funds will advance HHPD priorities and meet performance goals and include: a. Proposed Budget b. Percent of cost share: Submit the cost share and a summary of in-kind activities. See Section C.5., Cost Share or Match, for requirements. 3. Statement of assurances signed by authorized state official a. Statement and date of FEMA approval of state HMP which includes all-dam risk (insert ref/policy) b. Statement the applicant is able to comply with regulations associated with receipt of federal financial contributions from FEMA. c. If Pass-through Entity: Assurance statement that subrecipients will meet all criteria listed in Section C.3., Subrecipient Eligibility Criteria. d. Assurance statement that the 35 percent cost share requirement can be met. See Section C.5., Cost Share or Match, for requirements. 4. State Administrative Plan. At a minimum, the State Administrative Plan must include the items listed below: FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 24 a. Designation of the SAA responsible for program administration. b. Identification of the State Official responsible for financial and program matters related to the High Hazard Potential Dam Rehabilitation Grant Program c. Timely submission of HHPD quarterly performance progress reports on approved projects. d. Determination of staffing requirements and sources of staff necessary for administration of the program. e. If applicable, the establishment of procedures as a Pass-through Entity: 1. Identify, select, and notify potential subrecipients of the availability of the program. 2. Ensure that potential subrecipients are provided information on the application process, program eligibility, including the requirement for an approved mitigation plan that includes all dam risks for the jurisdiction where the dam is located, and key deadlines. 3. Determine subrecipient eligibility, including the requirement for an approved mitigation plan for the jurisdiction where the dam is located. 4. Submit revisions or amendments for FEMA review and approval. See Section F.2, Pass-Through Requirements. 5. Conduct environmental and floodplain management reviews. 6. Establish priorities for selection of projects. 7. Process requests for advances of funds and reimbursement. 8. Monitor and evaluate the progress and completion of the selected projects. 9. Review and approve cost overruns. 10. Process appeals. 11. Provide technical assistance as required to subrecipient(s) and/or jurisdiction where the dam is located including coordination with State Hazard Mitigation Officer regarding the eligibility requirement to have an approved mitigation plan that includes all dam risks and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). For more information on the Mitigation Plan Requirements, see Section E.1., Application Evaluation Criteria. 12. Comply with the administrative and audit requirements of 2 Code of Federal Regulations Part 200. 10. Other Submission Requirements Fair Wages and Labor Standards: Regarding payment of laborers and mechanics employed by contractors or subcontractors in the performance of construction work financed with the assistance of any contribution of Federal funds. Section 5196(j)(9) of the US Code of Laws Title 42. For a grant of an amount greater than $1,000,000, an eligible subrecipient that receives the grant shall require that each contract and subcontract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping, and related services entered into using FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 25 funds from the grant be awarded in the same manner as a contract for architectural and engineering services is awarded under— (A) chapter 11 of title 40; or (B) an equivalent qualifications-based requirement prescribed by the relevant State. 11. Intergovernmental Review An intergovernmental review may be required. Applicants must contact their state’s Single Point of Contact (SPOC) to comply with the state’s process under Executive Order 12372 (See https://www.archives.gov/federal-register/codification/executive-order/12372.html; www.whitehouse.gov/wp-content/uploads/2020/04/SPOC-4-13-20.pdf . 12. Funding Restrictions and Allowable Costs All costs charged to awards covered by this NOFO must comply with the Uniform Administrative Requirements, Cost Principles, and Audit Requirements at 2 C.F.R. Part 200, unless otherwise indicated in the NOFO, or the terms and conditions of the award. This includes, among other requirements, that costs must be incurred, and products and services must be delivered, within the period of performance of the award. See 2 C.F.R. § 200.403(h) (referring to budget periods, which for FEMA awards is the same as the period of performance). In general, the Cost Principles establish standards for the allowability of costs, provide detailed guidance on the cost accounting treatment of costs as direct or administrative costs, and set forth allowability principles for selected items of cost. More specifically, except as otherwise stated in this NOFO, the terms and condition of an award, or other program materials, costs charged to awards covered by this NOFO must be consistent with the Cost Principles for Federal Awards located at 2 C.F.R. Part 200, Subpart E. In order to be allowable, all costs charged to a FEMA award or applied to the cost share must be reasonable in nature and amount and allocable to the particular FEMA award. Additionally, all costs charged to awards must comply with the grant program’s applicable statutes, policies, requirements in this NOFO as well as with the terms and conditions of the award. If FEMA staff identify costs that are inconsistent with any of these requirements, these costs may be disallowed, and FEMA may recover funds as appropriate, consistent with applicable laws, regulations, and policies. As part of those requirements, grant recipients and subrecipients may only use federal funds or funds applied to a cost share for the purposes set forth in this NOFO and the terms and conditions of the award, and those costs must be consistent with the statutory authority for the award. Grant funds may not be used for matching funds for other federal grants/cooperative agreements, lobbying, or intervention in federal regulatory or adjudicatory proceedings. In addition, federal funds may not be used to sue the federal government or any other government entity. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 26 HHPD recipients may only fund activities and projects that are included and approved in the FY 2024 HHPD Work Plan and Budget. See Section H.17., Eligible Activities, for a description of eligible activities. See Section D.10., Content and Form of Application Submission, for Work Plan requirements. The maximum amount of funding any Subrecipient can receive under HHPD is statutorily limited. The maximum subrecipient funding cannot exceed the lesser of 12.5 percent of the total amount of funds made available. For the FY 2024 program, $185,120,000.00 is allocated to the HHPD program; therefore, no subrecipient may receive an award for more than $7,500,000.00. See Section H.15., Examples Using Funding Formula. a. Requirements Related to Contractor and Subcontractor Wages Per 33 U.S.C. § 467f-2(d)(2)(E), recipients and subrecipients are required to comply with the requirements of 42 U.S.C. § 5196(j)(9). All laborers and mechanics employed by contractors or subcontractors in the performance of construction work financed with the assistance of any contribution of Federal funds made by the Administrator under this subsection shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with sections 3141–3144, 3146, and 3147 of title 40, and every such employee shall receive compensation at a rate not less than one and ½ times the basic rate of pay of the employee for all hours worked in any workweek in excess of eight hours in any workday or 40 hours in the workweek, as the case may be. The Administrator shall make no contribution of Federal funds without first obtaining adequate assurance that these labor standards will be maintained upon the construction work. The Secretary of Labor shall have, with respect to the labor standards specified in this subsection, the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (5 U.S.C. App.) and section 3145 of title 40. b. Requirements Related to Contract and Subcontract Services Per 33 U.S.C. § 467f-2(i), a contract awarded shall not be considered to confer a proprietary interest upon the United States. As a condition on the receipt of a grant under this section of an amount greater than $1,000,000, recipients and subrecipients shall require that each contract and subcontract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping, and related services entered into using funds from the grant be awarded in the same manner as a contract for architectural and engineering services is awarded under 40 U.S. Code Chapter 11 or an equivalent qualifications-based requirement prescribed by the recipient state. c. Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services Recipients and subrecipients of FEMA federal financial assistance are subject to the prohibitions described in section 889 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (FY 2019 NDAA), Pub. L. No. 115-232 (2018) and 2 C.F.R. §§ 200.216, 200.327, 200.471, and Appendix II to 2 C.F.R. Part 200. Beginning August 13, FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 27 2020, the statute – as it applies to FEMA recipients, subrecipients, and their contractors and subcontractors – prohibits obligating or expending federal award funds on certain telecommunications and video surveillance products and contracting with certain entities for national security reasons. Guidance is available at FEMA Policy #405-143-1 - Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services Additional guidance is available at Contract Provisions Guide: Navigating Appendix II to Part 200 - Contract Provisions for Non-Federal Entity Contracts Under Federal Awards (fema.gov). Effective August 13, 2020, FEMA recipients and subrecipients may not use any FEMA funds under open or new awards to: • Procure or obtain any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; • Enter into, extend, or renew a contract to procure or obtain any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; or • Enter into, extend, or renew contracts with entities that use covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. I. D EFINITIONS Per section 889(f)(2)-(3) of the FY 2019 NDAA and 2 C.F.R. § 200.216, covered telecommunications equipment or services means: i. Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation, (or any subsidiary or affiliate of such entities); ii. For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities); iii. Telecommunications or video surveillance services provided by such entities or using such equipment; or iv. Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the People’s Republic of China. Examples of the types of products covered by this prohibition include phones, internet, video surveillance, and cloud servers when produced, provided, or used by FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 28 the entities listed in the definition of “covered telecommunications equipment or services.” See 2 C.F.R. § 200.471. d. Enhancing Critical Infrastructure Cybersecurity. When eligible subapplications include an information technology or operational technology component as part of a project under this program, FEMA will allow activities that enable greater resilience through cybersecurity as eligible costs when those activities are performed in accordance with the cybersecurity performance goals for critical infrastructure and control systems directed by the National Security Presidential Memorandum on Improving Cybersecurity for Critical Infrastructure Control Systems, found at https://www.cisa.gov/control-systems-goals-and-objectives. Subapplicants should address cybersecurity in their planning, design, and project oversight for awards that include a technology nexus that may pose a cyber risk that would affect the reliability or operability of project. e. Pre-Award Costs Pre-award costs are not allowed. f. Management and Administration (M&A) Costs Management and administration (M&A) activities are those directly relating to the management and administration of HHPD funds, such as financial management and monitoring. M&A costs are not operational costs. They are the necessary costs incurred in direct support of the grant or as a consequence of the grant and should be allocated across the entire lifecycle of the grant. A maximum of up to 10 percent of HHPD funds awarded may be retained by the state, and any funds retained are to be used solely for M&A purposes associated with the HHPD award. Subrecipients may also retain a maximum of up to 5 percent of the funding passed through by the state solely for M&A purposes associated with the HHPD award. Applicant requests for management costs must be included in the State Administrative Plan. Subrecipient management cost activities must be added to the scope of work section and reflected in the cost estimate section of subgrant applications. Applicants and subrecipients who do not receive awards/subawards will not receive reimbursement for management costs. g. Indirect Facilities & Administrative (F&A) Costs Indirect costs are allowable under this program as described in 2 Code of Federal Regulations Part 200, including 2 Code of Federal Regulations § 200.414. Applicants with a current negotiated indirect cost rate agreement that desire to charge indirect costs to an award must provide a copy of their negotiated indirect cost rate agreement at the time of application. Not all applicants are required to have a current negotiated indirect cost rate agreement. Applicants that are not required by 2 Code of Federal Regulations Part 200 to have a negotiated indirect cost rate agreement but are required by 2 Code of Federal Regulations. Part 200 to develop an indirect cost rate proposal must provide a copy of their proposal at the time of application. Applicants who do not have a current negotiated indirect cost rate agreement (including a provisional rate) and wish to charge the de minimis rate must reach out to the regional Grants Program Manager for further instructions. Applicants who wish to FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 29 use a cost allocation plan in lieu of an indirect cost rate must also reach out to the regional grants program manager for further instructions. E. Application Review Information 1. Application Evaluation Criteria In addition to the eligibility requirements stated in Section C., Eligibility Information, the following programmatic criteria must be met and will be evaluated during the application review. a. Programmatic Criteria for Mitigation Plan Requirement Applicant During the application review period for completeness and eligibility, FEMA will validate if the Applicant has an approved state mitigation plan that includes all dam risks. See Section H.19., Definitions, for the definition of All Dam Risk. If the Applicant has an approved state mitigation plan that does not include all dam risks, the program will inform the Applicant of the determination and the Applicant may submit a request for an extension to the mitigation plan requirement. Applicants may coordinate with FEMA for a review of the approved state mitigation plan to assess for all dam risks in advance of the application deadline. All supplemental attachments must be submitted via FEMA GO. See Section H.13., Mitigation Plan Requirement Extension Requests. Applicant’s state hazard mitigation plan will be assessed against 44 Code of Federal Regulations Part 201, Mitigation Planning, and the requirements specific to assessing all dam risks set forth in the State Mitigation Planning Policy Guide (FEMA, April 2022). The requirements in this NOFO supersede requirements in the Rehabilitation of High Hazard Potential Dams Grant Program Guidance (FEMA, June 2020) and the FEMA Policy 104- 008-7, to determine if the plan complies with the requirement to address all dam risks. For additional information on all other state mitigation plan requirements and FEMA procedures for review and approval of state mitigation plans, see the State Mitigation Planning Policy Guide (FEMA, April 2022). Subrecipients Subrecipients must demonstrate that the tribal or local government with jurisdiction over the area in which the dam is located has in place at the time the SAA submits the SOW package to FEMA, ands the time FEMA approves the SOW package, an approved hazard mitigation plan that includes all dam risks. See Section H.19., Definitions, for the definition of All Dam Risk. The hazard mitigation plan must comply with the Disaster Mitigation Act of 2000 (Public. L. 106–390; 114 Stat. 1552). Dams owned by nonprofit organizations that are subrecipients must be located in a local jurisdiction with an approved hazard mitigation plan that includes all dam risks and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). FEMA will determine if the mitigation plan addresses all dam risks in accordance with the requirements specific to assessing all dam risks set forth in the Local Mitigation Planning Policy Guide (FEMA, April 2022). These requirements supersede the Rehabilitation of High Hazard FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 30 Potential Dams Grant Program Guidance (FEMA, June 2020) and the FEMA Policy 104- 008-7, to determine if the plan complies with the requirement to address all dam risks. For additional information on all other local mitigation plan requirements and FEMA procedures for review and approval of local mitigation plans, see FEMA’s Local Mitigation Plan Review Guide (Local Guide) (2022) / Guía de Revisión del Plan Local de Mitigación (2022) or subsequent update. If the dam is located on land under jurisdiction of a Federally recognized tribal government, the tribal mitigation plan must address all dam risks. FEMA will validate whether each of the following elements are included in the tribal plan: a. Does the plan describe the incorporation of existing plans, studies, reports, and technical information for high hazard potential dams? b. Does the plan address high hazard potential dams in the risk assessment? c. Does the plan include mitigation goals to reduce long-term vulnerabilities from high hazard potential dams? d. Does the plan include actions that address high hazard potential dams, and prioritize mitigation actions to reduce vulnerabilities from high hazard potential dams? For additional information on tribal mitigation plan requirements, reference the Tribal Mitigation Plan Review Guide (December 2017). If an HHPD subrecipient cannot demonstrate that the local or tribal government with jurisdiction over the area in which the dam is located has in place a hazard mitigation plan that includes all dam risks; and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552); then the subrecipient may request an extension to meet this requirement, and may need to coordinate with the jurisdiction where the dam is located to update the mitigation plan to include all dam risks within twelve (12) months. For more information see Section H.13., Mitigation Plan Requirement Extension Requests. b. Financial Integrity Criteria Prior to making a federal award, FEMA is required by 31 U.S.C. § 3354, as enacted by the Payment Integrity Information Act of 2019, Pub. L. No. 116-117 (2020); 41 U.S.C. § 2313; and 2 C.F.R. § 200.206 to review information available through any Office of Management and Budget (OMB)-designated repositories of governmentwide eligibility qualification or financial integrity information, including whether the applicant is suspended or debarred. FEMA may also pose additional questions to the applicant to aid in conducting the pre-award risk review. Therefore, application evaluation criteria may include the following risk-based considerations of the applicant: i. Financial stability. ii. Quality of management systems and ability to meet management standards. iii. History of performance in managing federal award. iv. Reports and findings from audits. v. Ability to effectively implement statutory, regulatory, or other requirements. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 31 c. Supplemental Financial Integrity Criteria and Review Prior to making a federal award where the anticipated total federal share will be greater than the simplified acquisition threshold, currently $250,000: i. FEMA is required to review and consider any information about the applicant, including information on the applicant’s immediate and highest-level owner, subsidiaries, and predecessors, if applicable, that is in the designated integrity and performance system accessible through the System for Award Management (SAM), which is currently the Federal Awardee Performance and Integrity Information System (FAPIIS). ii. An applicant, at its option, may review information in FAPIIS and comment on any information about itself that a federal awarding agency previously entered. iii. FEMA will consider any comments by the applicant, in addition to the other information in FAPIIS, in making a judgment about the applicant’s integrity, business ethics, and record of performance under federal awards when completing the review of risk posed by applicants as described in 2 C.F.R. § 200.206. 2. Review and Selection Process The review and selection process will be completed in two parts: Part 1 FEMA reviews applications for completeness and eligibility as well as the brief scoping narratives for potential FY24 projects. After the Part 1 review is complete, FEMA will notify states of funding amounts via the FEMA GO system. During Part 1, SAAs will submit applications into Grants.gov and FEMA Go, and FEMA Headquarters will review the applications for completeness and eligibility. SAAs are to include clearly defined State objectives, a proposal narrative, and the required critical data to support proposal. Applicants will be evaluated and selected for funding based on the following: 1. The Applicant has the authority and demonstrates the capability necessary to successfully fulfill the requirements of the HHPD. 2. The dams included on the Applicant’s list of eligible high hazard potential dams meet eligibility criteria. 3. The Applicant demonstrates how HHPD funds will advance the HHPD priorities and performance goals and provides brief scoping narratives for potential FY24 projects. 4. The State Administrative Plan must clearly describe the SAA’s timelines and milestones for implementing the HHPD grant. The State Administrative Plan must describe the process for selecting subrecipients. The State Administrative Plan must also describe methodology FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 32 and data used to measure progress toward achieving the performance outcomes of the HHPD grant. 5. FEMA will validate if the Applicant has an approved state mitigation plan that includes all dam risks. FEMA may request additional information from the Applicant for clarification and better understanding of the proposed grant activities during this review period. Part 2 SAA accepts the funding award and develops and submits a Scope of Work (SOW) package to include a narrative of how and why the projects were selected for funding, detailed quarterly milestone workplan, EHP checklist, and budget narrative (Refer to FEMA Program Officer for checklist for SOW package). The SOW package must be submitted to FEMA for review during the Part 2 submission period. FEMA will review the subrecipient’s local hazard mitigation plan for eligibility. See Section D.10.b, Program-Specific Required Forms and Information and Section F.2., Pass-Through Requirements, for requirements. See Section E.1.a, Programmatic Criteria for Mitigation Plan Requirement, for more details on specific application evaluation criteria. F. Federal Award Administration Information 1. Notice of Award Before accepting the award, the AOR and recipient should carefully read the award package. The award package includes instructions on administering the grant award and the terms and conditions associated with responsibilities under federal awards. Recipients must accept all conditions in this NOFO as well as any specific terms and conditions in the Notice of Award to receive an award under this program. FEMA will provide the federal award package to the applicant electronically via FEMA GO. Award packages include an Award Letter, Summary Award Memo, Agreement Articles, and Obligating Document. An email notification of the award package will be sent through FEMA’s grant application system to the Authorized Organization Representative (AOR) that submitted the application. Recipients must accept their awards no later than 60 days from the award date. The recipient shall notify FEMA of its intent to accept and proceed with work under the award through the FEMA GO system. Funds will remain on hold until the recipient accepts the award through the FEMA GO system and all other conditions of the award have been satisfied or until the award is otherwise rescinded. Failure to accept a grant award within the specified timeframe may result in a loss of funds. 2. Pass-Through Requirements All pass-through entities must comply with 2 Code of Federal Regulations 200.332 Requirements for pass-through entities. Awards made to the SAA for HHPD carry additional FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 33 pass-through requirements. Pass-through is defined as an obligation on the part of the SAA to make funds available to eligible subrecipients. Four requirements must be met to pass- through grant funds: i. The SAA must submit a SOW package to FEMA for approval that describes the budget and project scope for each subrecipient in accordance with 2 Code of Federal Regulations § 200.308. ii. The SAA must make a firm written commitment to passing through grant funds to subrecipients; iii. The SAA’s commitment must be unconditional (i.e., no contingencies for the availability of SAA funds); iv. There must be documentary evidence (i.e., award document, terms, and conditions) of the commitment; and v. The award terms must be communicated to the subrecipient, including the requirement for an approved local or tribal mitigation plan (that meet the requirements set forth at 44 Code of Federal Regulations. Part 201 Mitigation Planning) that addresses all dam risks for the jurisdiction where the dam is located. Timing and Amount The SAA must pass-through the HHPD subaward to eligible subrecipients within 90 calendar days of receipt of the funds. “Receipt of the funds” occurs when the FEMA GO system releases the financial hold of the award, following FEMA approval of the SOW package. SAAs are sent notification of the release of financial hold of the HHPD award funds via the FEMA GO system. 3. Administrative and National Policy Requirements In addition to the requirements of in this section and in this NOFO, FEMA may place specific terms and conditions on individual awards in accordance with 2 C.F.R. Part 200. a. DHS Standard Terms and Conditions All successful applicants for DHS grant and cooperative agreements are required to comply with DHS Standard Terms and Conditions, which are available online at: DHS Standard Terms and Conditions. The applicable DHS Standard Terms and Conditions will be those in effect at the time the award was made. What terms and conditions will apply for the award will be clearly stated in the award package at the time of award. b. Ensuring the Protection of Civil Rights As the Nation works towards achieving the National Preparedness Goal, it is important to continue to protect the civil rights of individuals. Recipients and subrecipients must carry out their programs and activities, including those related to the building, sustainment, and FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 34 delivery of core capabilities, in a manner that respects and ensures the protection of civil rights for protected populations. Federal civil rights statutes, such as Section 504 of the Rehabilitation Act of 1973 and Title VI of the Civil Rights Act of 1964, along with DHS and FEMA regulations, prohibit discrimination on the basis of race, color, national origin, sex, religion, age, disability, limited English proficiency, or economic status in connection with programs and activities receiving federal financial assistance from FEMA. The DHS Standard Terms and Conditions include a fuller list of the civil rights provisions that apply to recipients. These terms and conditions can be found in the DHS Standard Terms and Conditions. Additional information on civil rights provisions is available at https://www.fema.gov/about/offices/equal-rights/civil-rights. Monitoring and oversight requirements in connection with recipient compliance with federal civil rights laws are also authorized pursuant to 44 C.F.R. Part 7. In accordance with civil rights laws and regulations, recipients and subrecipients must ensure the consistent and systematic fair, just, and impartial treatment of all individuals, including individuals who belong to underserved communities that have been denied such treatment. c. Environmental Planning and Historic Preservation (EHP) Compliance As a federal agency, FEMA is required to consider the effects of its actions on the environment and historic properties to ensure that all activities and programs funded by FEMA, including grant-funded projects, comply with federal EHP laws, Executive Orders, regulations, and policies, as applicable. All FEMA actions, including grant-funded actions, must comply with National Flood Insurance Program criteria or any more restrictive federal, state, or local floodplain management standards or building code (44 CFR § 9.11(d)(6)). All FEMA-funded non-critical actions in 1% annual chance floodplains (also known as 100- year floodplains) that involve structure elevation, mitigation reconstruction, dry floodproofing, new construction, repair of substantial damage or substantial improvement of structures must be elevated, at a minimum, to the lower of: • Two feet above the 1% annual chance flood elevation (also known as the base flood elevation), in accordance with the Federal Flood Risk Management Standard (FFRMS) “Freeboard Value Approach” (FVA); or • The 0.2% annual chance flood elevation. Where 0.2% annual chance flood elevations are not available, such actions must be elevated to at least two feet above the 1% annual chance flood elevation. All FEMA-funded critical actions in 1% annual chance floodplains or 0.2% annual chance floodplains (also known as 500-year floodplains) that involve structure elevation, mitigation reconstruction, dry floodproofing, new construction, repair of substantial damage or substantial improvement of structures must be elevated, at a minimum, to the higher of: FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 35 • Three feet above the 1% annual chance flood elevation; or • The 0.2% annual chance flood elevation. Where 0.2% annual chance flood elevations are not available, such actions must be elevated to at least three feet above the 1% annual chance flood elevation. See Executive Order 11988, Floodplain Management, as amended by Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input. Recipients and subrecipients proposing projects that have the potential to impact the environment, including, but not limited to, the construction of communication towers, modification or renovation of existing buildings, structures, and facilities, or new construction including replacement of facilities, must participate in the FEMA EHP review process. The EHP review process involves the submission of a detailed project description along with any supporting documentation requested by FEMA in order to determine whether the proposed project has the potential to impact environmental resources or historic properties. In some cases, FEMA is also required to consult with other regulatory agencies and the public in order to complete the review process. Federal law requires EHP review to be completed before federal funds are released to carry out proposed projects. FEMA may not be able to fund projects that are not incompliance with applicable EHP laws, Executive Orders, regulations, and policies. DHS and FEMA EHP policy is found in directives and instructions available on the FEMA.gov EHP page, the FEMA website page that includes documents regarding EHP responsibilities and program requirements, including implementation of the National Environmental Policy Act and other EHP regulations and Executive Orders. Individual FEMA programs have separate procedures to conduct and document EHP review. Guidance for individual grant programs is available from applicable program offices. d. Good Jobs The Good Jobs Initiative is a Department of Labor-led initiative that provides critical information to workers, employers, and government agencies as they work to improve job quality and create access to good jobs free from discrimination and harassment for all working people. During the implementation of a hazard mitigation project, applicants are encouraged to leverage the Good Jobs Initiative for information and resources on these topics. To learn more about the Good Jobs Initiative visit https://www.dol.gov/general/good- jobs. 4. Reporting Recipients are required to submit various financial and programmatic reports as a condition of award acceptance. Future awards and funds drawdown may be withheld if these reports are delinquent. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 36 a. Financial Reporting Requirements I. F EDERAL FINANCIAL REPORT (FFR) Recipients must report obligations and expenditures through the FFR form (SF-425) to FEMA. Recipients may review the Federal Financial Reporting Form (FFR) (SF-425) at https://www.grants.gov/web/grants/forms/post-award-reporting-forms.html#sortby=1 Recipients must file the FFR electronically using FEMA GO. II. FFR REPORTING PERIODS AND DUE DATES An FFR must be submitted quarterly throughout the POP, including partial calendar quarters, as well as in periods where no grant award activity occurs. The final FFR is due within 120 calendar days after the end of the POP. Future awards and fund drawdowns may be withheld if these reports are delinquent, demonstrate lack of progress, or are insufficient in detail. Except for the final FFR due at 120 days after the end of the POP for purposes of closeout, the following reporting periods and due dates apply for the FFR: Reporting Period Report Due Date October 1 – December 31 January 30 January 1 – March 31 April 30 April 1 – June 30 July 30 July 1 – September 30 October 30 b. Programmatic Performance Reporting Requirements I. PERFORMANCE PROGRESS REPORT (PPR) Grant recipients are responsible for providing performance reports on a quarterly basis. Performance progress reports should be submitted as either a word document or a pdf file. Performance progress reports are due within 30 days after the end of each reporting period, must be submitted via FEMA GO, and must include at a minimum the following: The recipient must use FEMA’s template to submit a quarterly performance progress report (PPR) for each award. See Appendix B, Performance Progress Report (PRR). Performance reports include: 1. Reporting period, date of report, and recipient point of contact (POC) name and contact information. 2. SF-PPR must be used and submitted via FEMA GO FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 37 3. Project identification information, including FEMA project number, subrecipient, and project type using standard FEMA GO. 4. Significant activities and developments that have occurred or have shown progress during the quarter, including a comparison of actual accomplishments to the work schedule objectives established in the subaward. 5. Percent completion and whether completion of work is on schedule; a discussion of any problems, delays, or adverse conditions that will impair the ability to meet the timelines stated in the subaward; and anticipated completion date. 6. Status of costs, including whether the costs are (1) unchanged, (2) overrun, or (3) underrun. If there is a change in cost status, the report should include a narrative describing the change. Also, include amount dispersed to subrecipient by activity. 7. A statement of whether a request to extend the award POP is anticipated. 8. Incremental funding amounts (SFM) and progress completed. 9. Additional information as required by FEMA to assess the progress of an award. The following reporting periods and due dates apply: Reporting Period Report Due Date August 1 – September 30 October 30 (First Report) October 1 – December 31 January 30 January 1 – March 31 April 30 April 1 – June 30 July 30 July 1 – September 30 October 30 c. Closeout Reporting Requirements I. CLOSEOUT REPORTING Within 120 calendar days after the end of the period of performance for the prime award or after an amendment has been issued to close out an award before the original POP ends, recipients must liquidate all financial obligations and must submit the following: i. The final request for payment, if applicable. ii. The final FFR (SF-425). iii. The final progress report detailing all accomplishments, including a narrative summary of the impact of those accomplishments throughout the period of performance. iv. Documentation regarding appeals or dispute settlement v. Other documents required by this funding opportunity, terms and conditions of the award, or other FEMA guidance. These include, but are not limited to: • Records for real property and equipment acquired with federal funds must be retained for three years after final disposition of the property. See 2 Code of Federal Regulations § 200.334(c). • If any litigation, claim, or audit is started before the expiration of the three-year period, the records must be retained until all litigation, claims, or audit findings involving the records have been resolved and final action taken. See 2 Code of Federal Regulations § 200.334(a). FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 38 • The record retention period will be extended if the recipient is notified in writing of the extension by FEMA, the cognizant or oversight agency for audit, or the cognizant agency for indirect costs. See 2 Code of Federal Regulations § 200.334(b). • Where FEMA requires recipients to report program income after the period of performance ends, the program income record retention period begins at the end of the recipient’s fiscal year in which program income is earned. See 2 Code of Federal Regulations § 200.334(e). • For indirect cost rate proposals, cost allocation plans, or other rate computations records, the start of the record retention period depends on whether the indirect cost rate documents were submitted for negotiation. If the indirect cost rate documents were submitted for negotiation, the record retention period begins from the date those documents were submitted for negotiation. If indirect cost rate documents were not submitted for negotiation, the record retention period begins at the end of the recipient’s fiscal year or other accounting period covered by that indirect cost rate. See 2 Code of Federal Regulations § 200.334(f). In addition, pass-through entities are responsible for closing out their subawards as described in 2 C.F.R. § 200.344; subrecipients are still required to submit closeout materials within 90 calendar days of the period of performance end date. When a subrecipient completes all closeout requirements, pass-through entities must promptly complete all closeout actions for subawards in time for the recipient to submit all necessary documentation and information to FEMA during the closeout of the prime award. After the prime award closeout reports have been reviewed and approved by FEMA, a closeout notice will be completed to close out the grant. The notice will indicate the period of performance as closed, list any remaining funds that will be de-obligated, and address the requirement of maintaining the grant records for at least three years from the date of the final FFR. The record retention period may be longer, such as due to an audit or litigation, for equipment or real property used beyond the period of performance, or due to other circumstances outlined in 2 C.F.R. § 200.334. The recipient is responsible for refunding to FEMA any balances of unobligated cash that FEMA paid that are not authorized to be retained per 2 C.F.R. § 200.344(d). II. A DMINISTRATIVE CLOSEOUT Administrative closeout is a mechanism for FEMA to unilaterally move forward with closeout of an award using available award information in lieu of final reports from the recipient per 2 C.F.R. § 200.344(h)-(i). It is a last resort available to FEMA, and if FEMA needs to administratively close an award, this may negatively impact a recipient’s ability to obtain future funding. This mechanism can also require FEMA to make cash or cost adjustments and ineligible cost determinations based on the information it has, which may result in identifying a debt owed to FEMA by the recipient. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 39 When a recipient is not responsive to FEMA’s reasonable efforts to collect required reports needed to complete the standard closeout process, FEMA is required under 2 C.F.R. § 200.344(h) to start the administrative closeout process within the regulatory timeframe. FEMA will make at least three written attempts to collect required reports before initiating administrative closeout. If the recipient does not submit all required reports in accordance with 2 C.F.R. § 200.344, this NOFO, and the terms and conditions of the award, FEMA must proceed to administratively close the award with the information available within one year of the period of performance end date. Additionally, if the recipient does not submit all required reports within one year of the period of performance end date, per 2 C.F.R. § 200.344(i), FEMA must report in FAPIIS the recipient’s material failure to comply with the terms and conditions of the award. If FEMA administratively closes an award where no final FFR has been submitted, FEMA uses that administrative closeout date in lieu of the final FFR submission date as the start of the record retention period under 2 C.F.R. § 200.334. In addition, if an award is administratively closed, FEMA may decide to impose remedies for noncompliance per 2 C.F.R. § 200.339, consider this information in reviewing future award applications, or apply special conditions to existing or future awards. d. Additional Reporting Requirements I. D ISCLOSING INFORMATION PER 2 C.F.R. § 180.335 This reporting requirement pertains to disclosing information related to government-wide suspension and debarment requirements. Before a recipient enters into a grant award with FEMA, the recipient must notify FEMA if it knows if it or any of the recipient’s principals under the award fall under one or more of the four criteria listed at 2 C.F.R. § 180.335: i. Are presently excluded or disqualified; ii. Have been convicted within the preceding three years of any of the offenses listed in 2 C.F.R. § 180.800(a) or had a civil judgment rendered against it or any of the recipient’s principals for one of those offenses within that time period; iii. Are presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state, or local) with commission of any of the offenses listed in 2 C.F.R. § 180.800(a); or iv. Have had one or more public transactions (federal, state, or local) terminated within the preceding three years for cause or default. At any time after accepting the award, if the recipient learns that it or any of its principals falls under one or more of the criteria listed at 2 C.F.R. § 180.335, the recipient must provide immediate written notice to FEMA in accordance with 2 C.F.R. § 180.350. II. R EPORTING OF MATTERS RELATED TO RECIPIENT INTEGRITY AND PERFORMANCE Per 2 C.F.R. Part 200, Appendix I § F.3, the additional post-award reporting requirements in 2 C.F.R. Part 200, Appendix XII may apply to applicants who, if upon becoming recipients, have a total value of currently active grants, cooperative agreements, and procurement contracts from all federal awarding agencies that exceeds $10,000,000 for any period of time during the period of performance of an award under this funding opportunity. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 40 Recipients that meet these criteria must maintain current information reported in FAPIIS about civil, criminal, or administrative proceedings described in paragraph 2 of Appendix XII at the reporting frequency described in paragraph 4 of Appendix XII. III. SINGLE AUDIT REPORT For audits of fiscal years beginning on or after December 26, 2014, recipients that expend $750,000 or more from all federal funding sources during their fiscal year are required to submit an organization-wide financial and compliance audit report, also known as the single audit report. The audit must be performed in accordance with the requirements of U.S. Government Accountability Office’s (GAO) Government Auditing Standards, located at https://www.gao.gov/yellowbook/overview, and the requirements of Subpart F of 2 C.F.R. Part 200, located at http://www.ecfr.gov/cgi-bin/text-idx?node=sp2.1.200.f. 5. Monitoring and Oversight Per 2 C.F.R. § 200.337, FEMA, through its authorized representatives, has the right, at all reasonable times, to make site visits or conduct desk reviews to review project accomplishments and management control systems to review award progress and to provide any required technical assistance. During site visits or desk reviews, FEMA will review recipients’ files related to the award. As part of any monitoring and program evaluation activities, recipients must permit FEMA, upon reasonable notice, to review grant-related records and to interview the organization’s staff and contractors regarding the program. Recipients must respond in a timely and accurate manner to FEMA requests for information relating to the award. Effective monitoring and oversight help FEMA ensure that recipients use grant funds for their intended purpose(s); verify that projects undertaken are consistent with approved plans; and ensure that recipients make adequate progress toward stated goals and objectives. Additionally, monitoring serves as the primary mechanism to ensure that recipients comply with applicable laws, rules, regulations, program guidance, and requirements. FEMA regularly monitors all grant programs both financially and programmatically in accordance with federal laws, regulations (including 2 C.F.R. Part 200), program guidance, and the terms and conditions of the award. All monitoring efforts ultimately serve to evaluate progress towards grant goals and proactively target and address issues that may threaten grant success during the period of performance. FEMA staff will periodically monitor recipients to ensure that administrative processes, policies and procedures, budgets, and other related award criteria are meeting Federal Government-wide and FEMA regulations. Aside from reviewing quarterly financial and programmatic reports, FEMA may also conduct enhanced monitoring through either desk- based review, onsite monitoring visits, or both. Enhanced monitoring will involve the review and analysis of the financial compliance and administrative processes, policies, activities, and other attributes of each federal assistance award, and it will identify areas where the recipient may need technical assistance, corrective actions, or other support. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 41 Financial and programmatic monitoring are complementary processes within FEMA’s overarching monitoring strategy that function together to ensure effective grants management, accountability, and transparency; validate progress against grant and program goals; and safeguard federal funds against fraud, waste, and abuse. Financial monitoring primarily focuses on statutory and regulatory compliance with administrative grant requirements, while programmatic monitoring seeks to validate and assist in grant progress, targeting issues that may be hindering achievement of project goals and ensuring compliance with the purpose of the grant and grant program. Both monitoring processes are similar in that they feature initial reviews of all open awards, and additional, in-depth monitoring of grants requiring additional attention. Recipients and subrecipients who are pass-through entities are responsible for monitoring their subrecipients in a manner consistent with the terms of the federal award at 2 C.F.R. Part 200, including 2 C.F.R. § 200.332. This includes the pass-through entity’s responsibility to monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with federal statutes, regulations, and the terms and conditions of the subaward; and that subaward performance goals are achieved. In terms of overall award management, recipient and subrecipient responsibilities include, but are not limited to: accounting of receipts and expenditures, cash management, maintaining adequate financial records, reporting and refunding expenditures disallowed by audits, monitoring if acting as a pass-through entity, or other assessments and reviews, and ensuring overall compliance with the terms and conditions of the award or subaward, as applicable, including the terms of 2 C.F.R. Part 200. G. DHS Awarding Agency Contact Information 1. Contact and Resource Information a. Program Office Contact Jena’I Jordan National Dam Safety Program Federal Emergency Management Agency Phone: (202) 646-3286 jenai.jordan@fema.dhs.gov FEMA Grants News FEMA Grants News is a non-emergency comprehensive management and information resource developed by FEMA for grants stakeholders. This channel provides general information on all FEMA grant programs and maintains a comprehensive database containing key personnel contact information at the federal, state, and local levels. When necessary, recipients will be directed to a federal point of contact who can answer specific programmatic questions or concerns. FEMA Grants Information Desk can be reached by e-mail at fema-grants- news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9:00 AM – 5:00 PM ET. c. Grant Programs Directorate (GPD) Award Administration Division FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 42 GPD’s Award Administration Division (AAD) provides support regarding financial matters and budgetary technical assistance. Additional guidance and information can be obtained by contacting the AAD’s Help Desk via e-mail at ASK-GMD@fema.dhs.gov. d. FEMA Regional Offices FEMA Regional Offices also may provide fiscal support, including pre- and post-award administration and technical assistance such as conducting cash analysis, financial monitoring, and audit resolution to the grant program under this NOFO. National Dam Safety Program Regional Program Manager will provide programmatic support and technical assistance. will provide programmatic support and technical assistance. FEMA Regional Offices manage, administer, and conduct the application budget review, create the award package, approve, amend, and close out awards, as well as conduct cash analysis, financial and programmatic monitoring, and audit resolution for National Dam Safety Program Regional Program Manager will provide programmatic support and technical assistance. The Regions also provide technical assistance to The Regions also provide technical assistance to HHPD recipients. FEMA Regional Office contact information is available at https://www.fema.gov/fema- regional-contacts. Region Dam Safety Program Officer Phone/email Regional Grants Management Staff  Phone/email 1 Christian Oates christian.oates@fema.dhs.gov (540) 326-1601 Tracy Narbeth tracy.narbeth@fema.dhs.gov (617) 306-9492 2 Regina Majercak regina.majercak@fema.dhs.gov (917) 561-3256 George W. Hogan III George.Hoganiii@fema.dhs.gov (212) 680-8599 3 Kristen Jones kristen.jones@fema.dhs.gov (267) 896-1116 Mark Lockett mark.lockett@fema.dhs.gov (215) 435-5256 4 Katy Goolsby- Brown & Nathaniel Sims, Sr. katy.goolsby- brown@fema.dhs.gov (770) 220-8811 nathaniel.simssr@fema.dhs.gov (770) 220-5200 Ceporia McMillian ceporia.mcmillian@fema.dhs.gov (202) 717-7096 5 FEMA HHPD fema-ndsp@fema.dhs.gov Jason Kirkman Jason.kirkman@fema.dhs.gov (312) 852-5580 6 John Miles, Jr. john.milesjr@fema.dhs.gov (816) 533-2873 David McCoy David.McCoy3@fema.dhs.gov (940) 383-7324 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 43 7 Dawn Livingston dawn.livingston@fema.dhs.gov Office: (816) 283-7055 Mobile: (816) 810-1609 Shelly Kirk Shelly.Kirk@fema.dhs.gov (816) 809-3279 8 Richard Hansen richard.hansen@fema.dhs.gov (303) 235-4807 Dan Carlson Dan.Carlson@fema.dhs.gov (303) 235-4825 9 Scott Nielsen scott.nielsen@fema.dhs.gov (510) 219-4510 Edita Billingsley Edita.billingsley@fema.dhs.gov (510) 627-7209 10 Nathan Stueve nathan.stueve@fema.dhs.gov (425) 301-6247 Kim Penfold kim.penfold@fema.dhs.gov (425) 487-4760 e. Equal Rights The FEMA Office of Equal Rights (OER) is responsible for compliance with and enforcement of federal civil rights obligations in connection with programs and services conducted by FEMA and recipients of FEMA financial assistance. All inquiries and communications about federal civil rights compliance for FEMA grants under this NOFO should be sent to FEMA-CivilRightsOffice@fema.dhs.gov. f. Environmental Planning and Historic Preservation GPD’s EHP Team provides guidance and information about the EHP review process to recipients and subrecipients. All inquiries and communications about GPD projects under this NOFO or the EHP review process, including the submittal of EHP review materials, should be sent to gpdehpinfo@fema.dhs.gov. The FEMA Office of Environmental Planning and Historic Preservation (OEHP) provides guidance and information about the EHP review process to FEMA programs and FEMA’s recipients and subrecipients. All inquiries and communications about EHP compliance for FEMA grant projects under this NOFO or the EHP review process should be sent to FEMA- OEHP-NOFOQuestions@fema.dhs.gov. 2. Systems Information a. Grants.gov For technical assistance with Grants.gov, call the customer support hotline 24 hours per day, 7 days per week (except federal holidays) at (800) 518-4726 or e-mail at support@grants.gov. b. Payment and Reporting System (FEMA GO) FEMA uses the FEMA GO system for financial reporting, invoicing, and tracking payments. FEMA uses the Direct Deposit/Electronic Funds Transfer (DD/EFT) method of payment to recipients. If you have questions about the online system, please call the Customer Service Center at (866) 927-5646 or email ask-GMD@fema.dhs.gov. c. FEMA Grant Outcomes (GO) FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 44 For technical assistance with the FEMA GO system, please contact the FEMA GO Helpdesk at femago@fema.dhs.gov or (877) 611-4700, Monday through Friday, 9:00 AM – 6:00 PM ET. H. Additional Information I. Termination Provisions FEMA may terminate a federal award in whole or in part for one of the following reasons. FEMA and the recipient must still comply with closeout requirements at 2 C.F.R. §§ 200.344-200.345 even if an award is terminated in whole or in part. To the extent that subawards are permitted under this NOFO, pass-through entities should refer to 2 C.F.R. § 200.340 for additional information on termination regarding subawards. a. Noncompliance If a recipient fails to comply with the terms and conditions of a federal award, FEMA may terminate the award in whole or in part. If the noncompliance can be corrected, FEMA may first attempt to direct the recipient to correct the noncompliance. This may take the form of a Compliance Notification. If the noncompliance cannot be corrected or the recipient is non- responsive, FEMA may proceed with a Remedy Notification, which could impose a remedy for noncompliance per 2 C.F.R. § 200.339, including termination. Any action to terminate based on noncompliance will follow the requirements of 2 C.F.R. §§ 200.341-200.342 as well as the requirement of 2 C.F.R. § 200.340(c) to report in FAPIIS the recipient’s material failure to comply with the award terms and conditions. See also the section on Actions to Address Noncompliance in this NOFO. b. With the Consent of the Recipient FEMA may also terminate an award in whole or in part with the consent of the recipient, in which case the parties must agree upon the termination conditions, including the effective date, and in the case of partial termination, the portion to be terminated. c. Notification by the Recipient The recipient may terminate the award, in whole or in part, by sending written notification to FEMA setting forth the reasons for such termination, the effective date, and in the case of partial termination, the portion to be terminated. In the case of partial termination, FEMA may determine that a partially terminated award will not accomplish the purpose of the federal award, so FEMA may terminate the award in its entirety. If that occurs, FEMA will follow the requirements of 2 C.F.R. §§ 200.341-200.342 in deciding to fully terminate the award. 2. Program Evaluation Recipients and subrecipients are encouraged to incorporate program evaluation activities from the outset of their program design and implementation to meaningfully document and measure their progress towards meeting an agency priority goal(s). Title I of the Foundations for Evidence-Based Policymaking Act of 2018 (Evidence Act), Pub. L. No. 115-435 (2019) urges federal awarding agencies and federal assistance recipients and subrecipients to use program evaluation as a critical tool to learn, to improve equitable delivery, and to elevate program service and delivery across the program lifecycle. Evaluation means “an assessment FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 45 using systematic data collection and analysis of one or more programs, policies, and organizations intended to assess their effectiveness and efficiency.” Evidence Act § 101 (codified at 5 U.S.C. § 311). Evaluation costs are allowable costs (either as direct or indirect), unless prohibited by statute or regulation. In addition, recipients are required to participate in a DHS-led evaluation if selected, which may be carried out by a third-party on behalf of the Program Office or DHS. By accepting grant funds, recipients agree to participate in the evaluation, which may include analysis of individuals who benefit from the grant, and provide access to program operating personnel and participants, as specified by the evaluator(s) during the award. 3. Period of Performance Extensions Extensions to the period of performance (POP) for this program are allowed. Extensions to the POP identified in the award will only be considered through formal, written requests to the recipient’s Regional Grants Program Office and must contain specific and compelling justifications as to why an extension is required. Recipients are advised to coordinate with the FEMA Regional Program Analyst as needed when preparing an extension request. All extension requests must address the following: a. The grant program, fiscal year, and award number; b. Reason for the delay –including details of the legal, policy, or operational challenges that prevent the final outlay of awarded funds by the deadline; c. Current status of the activity(ies); d. Approved POP termination date and new project completion date; e. Amount of funds drawn down to date; f. Remaining available funds, both federal and, if applicable, non-federal; g. Budget outlining how remaining federal and, if applicable, non-federal funds will be expended; h. Plan for completion, including milestones and timeframes for achieving each milestone and the position or person responsible for implementing the plan for completion; and i. Certification that the activity(ies) will be completed within the extended POP without any modification to the original statement of work, as described in the Rehabilitation of High Hazard Potential Dam Guidance and as approved by FEMA. Other documents required by this funding opportunity, terms and conditions of the award, or other FEMA guidance. Extension requests will be granted only due to compelling legal, policy, or operational challenges. Extension requests will only be considered for the following reasons: ￿ Contractual commitments by the recipient or subrecipient with vendors prevent completion of the project, including delivery of equipment or services, within the existing POP; ￿ The project must undergo a complex environmental review that cannot be completed within the existing POP; ￿ Projects are long-term by design, and therefore acceleration would compromise core programmatic goals; or FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 46 ￿ Where other special or extenuating circumstances exist. Recipients should submit all proposed extension requests to FEMA for review and approval at least 60 days prior to the end of the POP to allow sufficient processing time. Extensions are typically granted for no more than a six-month period. 4. Disability Integration Pursuant to Section 504 of the Rehabilitation Act of 1973, recipients of FEMA financial assistance must ensure that their programs and activities do not discriminate against other qualified individuals with disabilities. Grant recipients should engage with the whole community to advance individual and community preparedness and to work as a nation to build and sustain resilience. In doing so, recipients are encouraged to consider the needs of individuals with disabilities into the activities and projects funded by the grant. FEMA expects that the integration of the needs of people with disabilities will occur at all levels, including planning; alerting, notification, and public outreach; training; purchasing of equipment and supplies; protective action implementation; and exercises/drills. The following are examples that demonstrate the integration of the needs of people with disabilities in carrying out FEMA awards: ￿ Include representatives of organizations that work with/for people with disabilities on planning committees, work groups and other bodies engaged in development and implementation of the grant programs and activities. ￿ Hold all activities related to the grant in locations that are accessible to persons with physical disabilities to the extent practicable. ￿ Acquire language translation services, including American Sign Language, that provide public information across the community and in shelters. ￿ Ensure shelter-specific grant funds are in alignment with FEMA’s Guidance on Planning for Integration of Functional Needs Support Services in General Population Shelters. ￿ If making alterations to an existing building to a primary function area utilizing federal funds, complying with the most recent codes and standards, and making path of travel to the primary function area accessible to the greatest extent possible. ￿ Implement specific procedures used by public transportation agencies that include evacuation and passenger communication plans and measures for individuals with disabilities. ￿ Identify, create, and deliver training to address any training gaps specifically aimed toward whole-community preparedness. Include and interact with individuals with disabilities, aligning with the designated program capability. ￿ Establish best practices in inclusive planning and preparedness that consider physical access, language access, and information access. Examples of effective communication access include providing auxiliary aids and services such as sign language interpreters, Computer Aided Real-time Translation (CART), and materials in Braille or alternate formats. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 47 FEMA grant recipients can fund projects towards the resiliency of the whole community, including people with disabilities, such as training, outreach, and safety campaigns, provided that the project aligns with this NOFO and the terms and conditions of the award. 5. Conflicts of Interest in the Administration of Federal Awards or Subawards For conflicts of interest under grant-funded procurements and contracts, refer to the section on Procurement Integrity in this NOFO and 2 C.F.R. §§ 200.317 – 200.327. To eliminate and reduce the impact of conflicts of interest in the subaward process, recipients and pass-through entities must follow their own policies and procedures regarding the elimination or reduction of conflicts of interest when making subawards. Recipients and pass-through entities are also required to follow any applicable federal and state, local, tribal, or territorial (SLTT) statutes or regulations governing conflicts of interest in the making of subawards. The recipient or pass-through entity must disclose to the respective Program Analyst or Program Manager, in writing, any real or potential conflict of interest that may arise during the administration of the federal award, as defined by the federal or SLTT statutes or regulations or their own existing policies, within five days of learning of the conflict of interest. Similarly, subrecipients, whether acting as subrecipients or as pass-through entities, must disclose any real or potential conflict of interest to the recipient or next-level pass- through entity as required by the recipient or pass-through entity’s conflict of interest policies, or any applicable federal or SLTT statutes or regulations. Conflicts of interest may arise during the process of FEMA making a federal award in situations where an employee, officer, or agent, any members of his or her immediate family, his or her partner has a close personal relationship, a business relationship, or a professional relationship, with an applicant, sub applicant, recipient, subrecipient, or FEMA employees. 6. Procurement Integrity Through audits conducted by the DHS Office of Inspector General (OIG) and FEMA grant monitoring, findings have shown that some FEMA recipients have not fully adhered to the proper procurement requirements at 2 C.F.R. §§ 200.317 – 200.327 when spending grant funds. Anything less than full compliance with federal procurement requirements jeopardizes the integrity of the grant as well as the grant program. To assist with determining whether an action is a procurement or instead a subaward, please consult 2 C.F.R. § 200.331. For detailed guidance on the federal procurement standards, recipients and subrecipients should refer to various materials issued by FEMA’s Procurement Disaster Assistance Team (PDAT), such as the PDAT Field Manual and Contract Provisions Guide. Additional resources, including an upcoming trainings schedule can be found on the PDAT Website: https://www.fema.gov/grants/procurement. The below highlights the federal procurement requirements for FEMA recipients when procuring goods and services with federal grant funds. FEMA will include a review of recipients’ procurement practices as part of the normal monitoring activities. All FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 48 procurement activity must be conducted in accordance with federal procurement standards at 2 C.F.R. §§ 200.317 – 200.327. Select requirements under these standards are listed below. The recipient and any of its subrecipients must comply with all requirements, even if they are not listed below. Under 2 C.F.R. § 200.317, when procuring property and services under a federal award, states (including territories) must follow the same policies and procedures they use for procurements from their non-federal funds; additionally, states must now follow 2 C.F.R. § 200.321 regarding socioeconomic steps, 200.322 regarding domestic preferences for procurements, 200.323 regarding procurement of recovered materials, and 2 C.F.R. § 200.327 regarding required contract provisions. All other non-federal entities, such as tribes (collectively, non-state entities), must have and use their own documented procurement procedures that reflect applicable SLTT laws and regulations, provided that the procurements conform to applicable federal law and the standards identified in 2 C.F.R. Part 200. These standards include, but are not limited to, providing for full and open competition consistent with the standards of 2 C.F.R. § 200.319 and the required procurement methods at § 200.320. a. Important Changes to Procurement Standards in 2 C.F.R. Part 200 OMB recently updated various parts of Title 2 of the Code of Federal Regulations, among them, the procurement standards. States are now required to follow the socioeconomic steps in soliciting small and minority businesses, women’s business enterprises, and labor surplus area firms per 2 C.F.R. § 200.321. All non-federal entities should also, to the greatest extent practicable under a federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States per 2 C.F.R. § 200.322. More information on OMB’s revisions to the federal procurement standards can be found in Purchasing Under a FEMA Award: OMB Revisions Fact Sheet. The recognized procurement methods in 2 C.F.R. § 200.320 have been reorganized into informal procurement methods, which include micro-purchases and small purchases; formal procurement methods, which include sealed bidding and competitive proposals; and noncompetitive procurements. The federal micro-purchase threshold is currently $10,000, and non-state entities may use a lower threshold when using micro-purchase procedures under a FEMA award. If a non-state entity wants to use a micro-purchase threshold higher than the federal threshold, it must follow the requirements of 2 C.F.R. § 200.320(a)(1)(iii)- (v). The federal simplified acquisition threshold is currently $250,000, and a non-state entity may use a lower threshold but may not exceed the federal threshold when using small purchase procedures under a FEMA award. See 2 C.F.R. § 200.1 (citing the definition of simplified acquisition threshold from 48 C.F.R. Part 2, Subpart 2.1). See 2 C.F.R. §§ 200.216, 200.471, and Appendix II as well as section D.13.a of the NOFO regarding prohibitions on covered telecommunications equipment or services. b. Competition and Conflicts of Interest FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 49 Among the requirements of 2 C.F.R. § 200.319(b) applicable to all non-federal entities other than states, in order to ensure objective contractor performance and eliminate unfair competitive advantage, contractors that develop or draft specifications, requirements, statements of work, or invitations for bids or requests for proposals must be excluded from competing for such procurements. FEMA considers these actions to be an organizational conflict of interest and interprets this restriction as applying to contractors that help a non- federal entity develop its grant application, project plans, or project budget. This prohibition also applies to the use of former employees to manage the grant or carry out a contract when those former employees worked on such activities while they were employees of the non- federal entity. Under this prohibition, unless the non-federal entity solicits for and awards a contract covering both development and execution of specifications (or similar elements as described above), and this contract was procured in compliance with 2 C.F.R. §§ 200.317 – 200.327, federal funds cannot be used to pay a contractor to carry out the work if that contractor also worked on the development of those specifications. This rule applies to all contracts funded with federal grant funds, including pre-award costs, such as grant writer fees, as well as post- award costs, such as grant management fees. Additionally, some of the situations considered to be restrictive of competition include, but are not limited to: ￿ Placing unreasonable requirements on firms for them to qualify to do business; ￿ Requiring unnecessary experience and excessive bonding; ￿ Noncompetitive pricing practices between firms or between affiliated companies; ￿ Noncompetitive contracts to consultants that are on retainer contracts; ￿ Organizational conflicts of interest; ￿ Specifying only a “brand name” product instead of allowing “an equal” product to be offered and describing the performance or other relevant requirements of the procurement; and ￿ Any arbitrary action in the procurement process. Per 2 C.F.R. § 200.319(c), non-federal entities other than states must conduct procurements in a manner that prohibits the use of statutorily or administratively imposed SLTT geographical preferences in the evaluation of bids or proposals, except in those cases where applicable federal statutes expressly mandate or encourage geographic preference. Nothing in this section preempts state licensing laws. When contracting for architectural and engineering services, geographic location may be a selection criterion provided its application leaves an appropriate number of qualified firms, given the nature and size of the project, to compete for the contract. Under 2 C.F.R. § 200.318(c)(1), non-federal entities other than states are required to maintain written standards of conduct covering conflicts of interest and governing the actions of their employees engaged in the selection, award, and administration of contracts. No employee, officer, or agent may participate in the selection, award, or administration of a contract supported by a federal award if he or she has a real or apparent conflict of interest. Such conflicts of interest would arise when the employee, officer or agent, any member of FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 50 his or her immediate family, his or her partner, or an organization that employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from a firm considered for a contract. The officers, employees, and agents of the non-federal entity may neither solicit nor accept gratuities, favors, or anything of monetary value from contractors or parties to subcontracts. However, non-federal entities may set standards for situations in which the financial interest is not substantial, or the gift is an unsolicited item of nominal value. The standards of conduct must provide for disciplinary actions to be applied for violations of such standards by officers, employees, or agents of the non-federal entity. Under 2 C.F.R. 200.318(c)(2), if the recipient or subrecipient (other than states) has a parent, affiliate, or subsidiary organization that is not a state, local, tribal, or territorial government, the non-federal entity must also maintain written standards of conduct covering organizational conflicts of interest. In this context, organizational conflict of interest means that because of a relationship with a parent company, affiliate, or subsidiary organization, the non-federal entity is unable or appears to be unable to be impartial in conducting a procurement action involving a related organization. The non-federal entity must disclose in writing any potential conflicts of interest to FEMA or the pass-through entity in accordance with applicable FEMA policy. c. Supply Schedules and Purchasing Programs Generally, a non-federal entity may seek to procure goods or services from a federal supply schedule, state supply schedule, or group purchasing agreement. I. G ENERAL SERVICES ADMINISTRATION SCHEDULES States, tribes, and local governments, and any instrumentality thereof (such as local education agencies or institutions of higher education) may procure goods and services from a General Services Administration (GSA) schedule. GSA offers multiple efficient and effective procurement programs for state, tribal, and local governments, and instrumentalities thereof, to purchase products and services directly from pre-vetted contractors. The GSA Schedules (also referred to as the Multiple Award Schedules and the Federal Supply Schedules) are long-term government-wide contracts with commercial firms that provide access to millions of commercial products and services at volume discount pricing. Information about GSA programs for states, tribes, and local governments, and instrumentalities thereof, can be found at https://www.gsa.gov/resources-for/programs-for- State-and-local-governments and https://www.gsa.gov/buying-selling/purchasing- programs/gsa-schedules/schedule-buyers/state-and-local-governments. For tribes, local governments, and their instrumentalities that purchase off of a GSA schedule, this will satisfy the federal requirements for full and open competition provided that the recipient follows the GSA ordering procedures; however, tribes, local governments, and their instrumentalities will still need to follow the other rules under 2 C.F.R. §§ 200.317 – 200.327, such as solicitation of minority businesses, women’s business enterprises, small businesses, or labor surplus area firms (§ 200.321), domestic preferences (§ 200.322), FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 51 contract cost and price (§ 200.324), and required contract provisions (§ 200.327 and Appendix II). II. O THER SUPPLY SCHEDULES AND PROGRAMS For non-federal entities other than states, such as tribes, local governments, and nonprofits, that want to procure goods or services from a state supply schedule, cooperative purchasing program, or other similar program, in order for such procurements to be permissible under federal requirements, the following must be true: ￿ The procurement of the original contract or purchasing schedule and its use by the non-federal entity complies with state and local law, regulations, and written procurement procedures; ￿ The state or other entity that originally procured the original contract or purchasing schedule entered into the contract or schedule with the express purpose of making it available to the non-federal entity and other similar types of entities; ￿ The contract or purchasing schedule specifically allows for such use, and the work to be performed for the non-federal entity falls within the scope of work under the contract as to type, amount, and geography; ￿ The procurement of the original contract or purchasing schedule complied with all the procurement standards applicable to a non-federal entity other than states under at 2 C.F.R. §§ 200.317 – 200.327; and ￿ With respect to the use of a purchasing schedule, the non-federal entity must follow ordering procedures that adhere to applicable state, tribal, and local laws and regulations and the minimum requirements of full and open competition under 2 C.F.R. Part 200. If a non-federal entity other than a state seeks to use a state supply schedule, cooperative purchasing program, or other similar type of arrangement, FEMA recommends the recipient discuss the procurement plans with its regional FEMA Grant Program Manager / Specialist. d. Procurement Documentation Per 2 C.F.R. § 200.318(i), non-federal entities other than states and territories are required to maintain and retain records sufficient to detail the history of procurement covering at least the rationale for the procurement method, selection of contract type, contractor selection or rejection, and the basis for the contract price. States and territories are encouraged to maintain and retain this information as well and are reminded that in order for any cost to be allowable, it must be adequately documented per 2 C.F.R. § 200.403(g). Examples of the types of documents that would cover this information include but are not limited to: ￿ Solicitation documentation, such as requests for quotes, invitations for bids, or requests for proposals; ￿ Responses to solicitations, such as quotes, bids, or proposals; ￿ Pre-solicitation independent cost estimates and post-solicitation cost/price analyses on file for review by federal personnel, if applicable; ￿ Contract documents and amendments, including required contract provisions; and FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 52 ￿ Other documents required by federal regulations applicable at the time a grant is awarded to a recipient. • Additional information on required procurement records can be found on pages 24-26 of the PDAT Field Manual. 7. FEMA Financial Assistance Programs for Infrastructure Build America, Buy America Act Recipients and subrecipients must comply with the Build America, Buy America Act (BABAA), which was enacted as part of the Infrastructure Investment and Jobs Act §§ 70901-70927, Pub. L. No. 117-58 (2021); and Executive Order 14005, Ensuring the Future is Made in All of America by All of America’s Workers. See also 2 C.F.R. Part 184 and OMB MemorandumM-24-02, Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure. Section 70914 of BABAA requires all federal agencies, including FEMA, to ensure that none of the funds provided under this program may be used for a project for infrastructure unless the iron and steel, manufactured products, and construction materials used in that infrastructure are produced in the United States. For FEMA financial assistance programs, these requirements apply to new infrastructure awards made on or after January 2, 2023, as well as new funding FEMA obligates to existing awards or through renewal awards on or after January 2, 2023. The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project. To see whether a particular FEMA federal financial assistance program is considered an infrastructure program and thus required to include a Buy America preference, please see Programs and Definitions: Build America, Buy America Act | FEMA.gov. To ensure compliance with BABAA, all recipient and subrecipient contracts under FEMA infrastructure awards must include a contract provision explaining the BABAA requirements and a self-certification where the contracts can certify compliance with the domestic preference requirements, unless the BABAA requirement is waived by FEMA. Please see Buy America Preference in FEMA Financial Assistance Programs for Infrastructure FEMA Interim Policy #207-22-0001. a. Waivers FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 53 When necessary, recipients (and subrecipients through their pass-through entity) may apply for, and FEMA may grant, a waiver from these requirements. A waiver of the domestic content procurement preference may be granted by the agency awarding official if FEMA determines that: 1) Applying the domestic content procurement preference would be inconsistent with the public interest. 2) The types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality. 3) The inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25%. Prior to requesting a waiver, recipients and subrecipients should consider whether a FEMA approved general applicability waiver applies to their projects. The term “general applicability waiver” refers to a waiver that applies generally across multiple awards and do not require a separate application or approval by FEMA prior to use. These may cover categories of products known to be unavailable domestically or are intended to ease the burden of compliance. For a list of FEMA’s general applicability waivers, and for additional information on FEMA’s process for requesting a project- specific waiver from the Buy America preference requirements, please see FEMA’s website at: "Buy America" Preference in FEMA Financial Assistance Programs for Infrastructure | FEMA.gov. b. Definitions For BABAA specific definitions, please refer to the FEMA Buy America website at: Programs and Definitions: Build America, Buy America Act | FEMA.gov. c. Please refer to the applicable DHS Standard Terms & Conditions for the BABAA specific term applicable to all FEMA financial assistance awards for infrastructure. 8. Record Retention a. Record Retention Period Financial records, supporting documents, statistical records, and all other non-Federal entity records pertinent to a federal award generally must be maintained for at least three years from the date the final FFR is submitted. See 2 C.F.R. § 200.334. Further, if the recipient does not submit a final FFR and the award is administratively closed, FEMA uses the date of administrative closeout as the start of the general record retention period. The record retention period may be longer than three years or have a different start date in certain cases. These include: FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 54 ￿ Records for real property and equipment acquired with Federal funds must be retained for three years after final disposition of the property. See 2 C.F.R. § 200.334(c). ￿ If any litigation, claim, or audit is started before the expiration of the three-year period, the records must be retained until all litigation, claims, or audit findings involving the records have been resolved and final action taken. See 2 C.F.R. § 200.334(a). ￿ The record retention period will be extended if the non-federal entity is notified in writing of the extension by FEMA, the cognizant or oversight agency for audit, or the cognizant agency for indirect costs, or pass-through entity. See 2 C.F.R. § 200.334(b). ￿ Where FEMA requires recipients to report program income after the period of performance ends, the program income record retention period begins at the end of the recipient’s fiscal year in which program income is earned. See 2 C.F.R. § 200.334(e). ￿ For indirect cost rate computations and proposals, cost allocation plans, or any similar accounting computations of the rate at which a particular group of costs is chargeable (such as computer usage chargeback rates or composite fringe benefit rates), the start of the record retention period depends on whether the indirect cost rate documents were submitted for negotiation. If the indirect cost rate documents were submitted for negotiation, the record retention period begins from the date those documents were submitted for negotiation. If indirect cost rate documents were not submitted for negotiation, the record retention period begins at the end of the recipient’s fiscal year or other accounting period covered by that indirect cost rate. See 2 C.F.R. § 200.334(f). b. Types of Records to Retain FEMA requires that non-federal entities maintain the following documentation for federally funded purchases: ￿ Specifications ￿ Solicitations ￿ Competitive quotes or proposals ￿ Basis for selection decisions ￿ Purchase orders ￿ Contracts ￿ Invoices ￿ Cancelled checks Non-federal entities should keep detailed records of all transactions involving the grant. FEMA may at any time request copies of any relevant documentation and records, including purchasing documentation along with copies of cancelled checks for verification. See, e.g., 2 C.F.R. §§ 200.318(i), 200.334, 200.337. In order for any cost to be allowable, it must be adequately documented per 2 C.F.R. § 200.403(g). Non-federal entities who fail to fully document all purchases may find their expenditures questioned and subsequently disallowed. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 55 9. Actions to Address Noncompliance Non-federal entities receiving financial assistance funding from FEMA are required to comply with requirements in the terms and conditions of their awards or subawards, including the terms set forth in applicable federal statutes, regulations, NOFOs, and policies. Throughout the award lifecycle or even after an award has been closed, FEMA or the pass- through entity may discover potential or actual noncompliance on the part of a recipient or subrecipient. This potential or actual noncompliance may be discovered through routine monitoring, audits, closeout, or reporting from various sources. In the case of any potential or actual noncompliance, FEMA may place special conditions on an award per 2 C.F.R. §§ 200.208 and 200.339, FEMA may place a hold on funds until the matter is corrected, or additional information is provided per 2 C.F.R. § 200.339, or it may do both. Similar remedies for noncompliance with certain federal civil rights laws are authorized pursuant to 44 C.F.R. Parts 7 and 19. In the event the noncompliance is not able to be corrected by imposing additional conditions or the recipient or subrecipient refuses to correct the matter, FEMA might take other remedies allowed under 2 C.F.R. § 200.339. These remedies include actions to disallow costs, recover funds, wholly or partly suspend, or terminate the award, initiate suspension, and debarment proceedings, withhold further federal awards, or take other remedies that may be legally available. For further information on termination due to noncompliance, see the section on Termination Provisions in the NOFO. FEMA may discover and take action on noncompliance even after an award has been closed. The closeout of an award does not affect FEMA’s right to disallow costs and recover funds as long the action to disallow costs takes place during the record retention period. See 2 C.F.R. §§ 200.334, 200.345(a). Closeout also does not affect the obligation of the non-federal entity to return any funds due as a result of later refunds, corrections, or other transactions. 2 C.F.R. § 200.345(a)(2). The types of funds FEMA might attempt to recover include, but are not limited to, improper payments, cost share reimbursements, program income, interest earned on advance payments, or equipment disposition amounts. FEMA may seek to recover disallowed costs through a Notice of Potential Debt Letter, a Remedy Notification, or other letter. The document will describe the potential amount owed, the reason why FEMA is recovering the funds, the recipient’s appeal rights, how the amount can be paid, and the consequences for not appealing or paying the amount by the deadline. If the recipient neither appeals nor pays the amount by the deadline, the amount owed will become final. Potential consequences if the debt is not paid in full or otherwise resolved by the deadline include the assessment of interest, administrative fees, and penalty charges; administratively offsetting the debt against other payable federal funds; and transferring the debt to the U.S. Department of the Treasury for collection. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 56 FEMA notes the following common areas of noncompliance for FEMA’s grant programs: ￿ Insufficient documentation and lack of record retention. ￿ Failure to follow the procurement under grants requirements. ￿ Failure to submit closeout documents in a timely manner. ￿ Failure to follow EHP requirements. ￿ Failure to comply with the POP deadline. 10. Audits FEMA grant recipients are subject to audit oversight from multiple entities including the DHS OIG, the GAO, the pass-through entity, or independent auditing firms for single audits, and may cover activities and costs incurred under the award. Auditing agencies such as the DHS OIG, the GAO, and the pass-through entity (if applicable), and FEMA in its oversight capacity, must have access to records pertaining to the FEMA award. Recipients and subrecipients must retain award documents for at least three years from the date the final FFR is submitted, and even longer in many cases subject to the requirements of 2 C.F.R. § 200.334. In the case of administrative closeout, documents must be retained for at least three years from the date of closeout, or longer subject to the requirements of 2 C.F.R. § 200.334. If documents are retained longer than the required retention period, the DHS OIG, the GAO, and the pass-through entity, as well as FEMA in its oversight capacity, have the right to access these records as well. See 2 C.F.R. §§ 200.334, 200.337. Additionally, non-federal entities must comply with the single audit requirements at 2 C.F.R. Part 200, Subpart F. Specifically, non-federal entities, other than for-profit subrecipients, that expend $750,000 or more in federal awards during their fiscal year must have a single or program-specific audit conducted for that year in accordance with Subpart F. 2 C.F.R. § 200.501. A single audit covers all federal funds expended during a fiscal year, not just FEMA funds. The cost of audit services may be allowable per 2 C.F.R. § 200.425, but non-federal entities must select auditors in accordance with 2 C.F.R. § 200.509, including following the proper procurement procedures. For additional information on single audit reporting requirements, (See F.4c,”Additional Reporting Requirements” or other applicable document). The objectives of single audits are to: ￿ Determine if financial statements conform to generally accepted accounting principles (GAAP); ￿ Determine whether the schedule of expenditures of federal awards is presented fairly; ￿ Understand, assess, and test the adequacy of internal controls for compliance with major programs; and ￿ Determine if the entity complied with applicable laws, regulations, and contracts or grants. For single audits, the auditee is required to prepare financial statements reflecting its financial position, a schedule of federal award expenditures, and a summary of the status of prior audit findings and questioned costs. The auditee also is required to follow up and take appropriate corrective actions on new and previously issued but not yet addressed audit findings. The auditee must prepare a corrective action plan to address the new audit findings. 2 C.F.R. §§ 200.508, 200.510, 200.511. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 57 Non-federal entities must have an audit conducted, either single or program-specific, of their financial statements and federal expenditures annually or biennially pursuant to 2 C.F.R. § 200.504. Non-federal entities must also follow the information submission requirements of 2 C.F.R. § 200.512, including submitting the audit information to the Federal Audit Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or nine months after the end of the audit period. The audit information to be submitted include the data collection form described at 2 C.F.R. § 200.512(c) and Appendix X to 2

Text truncated. Open the original for the full document.

Source: Oconee County website. First collected Nov 19, 2026.