RecordWell Data

Backup Material

Oconee County · Oconee County · meeting of Sep 17, 2024 · Minutes

Open the original document More from Oconee County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 STATE OF SOUTH CAROLINA COUNTY OF OCONEE ORDINANCE 2024-20 AN ORDINANCE AUTHORIZING OCONEE COUNTY, SOUTH CAROLINA TO FINANCE AND ACQUIRE CERTAIN TANKER TRUCKS AND RELATED EQUIPMENT IN AN AMOUNT NOT EXCEEDING $ 3,380,000; TO EXECUTE AND DELIVER ALL DOCUMENTS NECESSARY TO CARRY OUT THE FINANCING AND ACQUISITION; AND OTHER RELATED MATTERS. Pursuant to the authority of the Constitution of the State of South Carolina (“State”) and the general laws of the State, BE IT ENACTED BY OCONEE COUNTY COUNCIL: Section 1. Findings and Determinations. (a) Oconee County (“County”) is a body corporate and politic and political subdivision of the State and has the power to enter into agreements to finance and acquire equipment. (b) The County desires to acquire and finance certain tanker trucks and related equipment in an amount not exceeding $3,380,000 (“Equipment”), through means of borrowing money from a bank or other financial institution selected by the County Administrator (“Financing”). (c) It is in the best interest of the County to acquire the Equipment by entering into the Financing, and the Financing will enable the County to acquire the Equipment, which is necessary for the County’s proper operation. Section 2. Approval of Acquisition and Financing; Delegation of Authority. The County shall acquire and finance the Equipment in accord ance with a lease -purchase financing arrangement, or other similar means of financing, which is repayable by annual appropriations from operational millage, or other sources, or from general obligation indebtedness, as the County Administrator may determine. If the Financing is accomplished through a traditional lease -purchase arrangement, the Financing will not constitute a “financing agreement,” and the Equipment will not constitute an “asset” as these terms are defined in South Carolina Code Annotated se ction 11-27-110. Thus, the amount of the Financing will not be includable when calculating the County’s constitutional debt limit, and the Financing will be subject to annual appropriation by the County. Should the Financing be accomplished through any alt ernative means, the County Administrator shall likewise endeavor to ensure the Financing does not count against the County’s constitutional debt limit. At the County Administrator’s direction, in consultation with the County Attorney and the County’s Bond Counsel, the County shall distribute a request for offers or provide for a similar notice to three or more banks and/ or other financial institutions. Without further authorization, the County Council delegates to the County Administrator the authority to ( a) determine the payment schedule under the Financing; (b) determine the date and time for receipt of offers; (c) award the Financing using a number of factors, including applicable interest rate, provided the net interest cost does not exceed 6.0% per ann um; and (d) make reasonable changes to the quantity, cost, or description of the Equipment, a substantially final 2 list of which is attached as Schedule I. Section 3. Approval of Agreements. Without further authorization, the County Administrator is authorized to approve the form, terms, and provisions of the Financing. The County Administrator is authorized, empowered, and directed to execute, acknowledge, and deliver the various documents necessary to carry out the Equipment acquisition and Financing (“Tra nsaction Documents”) in the name and on behalf of the County. The Transaction Documents are to be in the form as shall be approved by the County Administrator in consultation with the County Attorney and Bond Counsel, the execution thereof to constitute conclusive evidence of that approval. Section 4. Execution of Documents. The County Council Chairman, the County Administrator, the County Attorney, and the Clerk to County Council are fully empowered and authorized to take further action and to execute and deliver all documents as may be reasonably necessary to effect the Financing and the delivery of the Transaction Documents and any related documents in accordance with their terms, and the contemplated transactions, and the action of these officers in exec uting and delivering any of these documents, in the form as the County Administrator shall approve, in consultation with the County Attorney and the County’s Bond Counsel, is fully authorized. Section 5. Federal Tax Covenant. The County covenants that it will not take , or fail to take, any action which will cause interest components of the payments to be made under the Transaction Documents to become includable in the gross income of the successful Bidder or its successors or assignees for federal income tax purposes pursuant to the provisions of the Internal Revenue Code of 1986, as amended (“IRC”), and regulations promulgated thereunder in effect on the date of original issuance of the Transaction Documents, and that the County will comply with all applicable provisions of Section 103 and Sections 141 through 150 of the IRC, and any regulations promulgated thereunder, to maintain the exclusion from gross income for federal income tax purposes of the interest portion of the pay ments to be made under the Transaction Documents; and to that end the County shall: (a) comply with the applicable provisions of Section 103 and 141 through 150 of the IRC and any regulations promulgated thereunder so long as the Financing is outstanding; (b) establish funds, make calculations, and pay amounts in the manner and at the times required to comply with the requirements of the IRC relating to required rebates of certain amounts to the United States; and (c) make reports of information at the times and places required by the IRC. If at the time the Financing is closed, the County does not reasonably anticipate issuing more than $10,000,000 in tax-exempt obligations which are not “private activity bonds” during calendar year 2024, all within the meaning of Section 265(b) of the IRC, then the County intends to designate the Financing as a “qualified tax-exempt obligation” in accordance with Section 265(b)(3) of the IRC. The County will timely file Form 8038 -G in accordance with the applicable regulations of the Internal Revenue Service. Section 6. Bond Counsel. The County selects King Kozlarek Root Law LLC to serve as its Bond Counsel related to this Financing and understands Bond Counsel’s role will be limited to those matters necessary to effect the Financing and issue a customary bond counsel opinion (including related to any tax consequences). Further, the County understands Bond Counsel does not provide financial advisory or municipal advisory services but offers legal advice and services of a trad itional legal nature. 3 Section 7. Financial Advisor. The County serves as its own financial/municipal advisor related to the Financing. Section 8. Severability. All orders, resolutions, and ordinances, including any parts thereof, in conflict with this Ordinance are, to the extent of any such conflict, repealed. Section 9. Effective Date. This Ordinance takes and remains in effect only after the County Council has approved it following three readings and a public hearing. [ONE SIGNATURE PAGE AND ONE SCHEDULE FOLLOW] [REMAINDER OF PAGE INTENTIONALLY BLANK] 4 OCONEE COUNTY, SOUTH CAROLINA Matthew Durham Chairman, Oconee County Council (SEAL) ATTEST: Jennifer C. Adams Clerk to Council READINGS: First reading: August 20, 2024 Second reading: September 3, 2024 Public Hearing: September 17, 2024 Third reading: September 17, 2024 5 SCHEDULE I DESCRIPTION OF EQUIPMENT Six (6) New FES/Freightliner Tanker Trucks with related apparatuses and equipment STATE OF SOUTH CAROLINA COUNTY OF OCONEE ORDINANCE 2024-23 AN ORDINANCE AMENDING PORTIONS OF CHAPTERS 32 AND 38 OF THE OCONEE COUNTY CODE OF ORDINANCES, IN LIMITED REGARDS AND PARTICULARS ONLY, IN ORDER TO REVISE CERTAIN SETBACK-RELATED PROVISIONS, INCLUDING DEFINITIONS AND THE APPLICATION THEREOF ; AND OTHER MATTERS RELATED THERETO. WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9- 25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political subdivision of the State of South Carolina, acting by and through its governing body, the Oconee County Council (“County Council”), has the authority to enact regulations, resolutions, and ordinances, not inconsistent with the Constitution and the general law of the State of South Carolina, including the exercise of such powers in relation to health and order within its boundaries and respecting any subject as appears to it necessary and proper for the security, general welfare, and convenience of the County or for preserving health, peace, order, and good government therein; WHEREAS, t he County has adopted multiple ordinances for the effective, efficient governance of the County, which, subsequent to adoption, are codified in the Oconee County Code of Ordinances (“Code of Ordinances”), as amended; WHEREAS, the County is authorized by Section 4 -9-30(9) and Chapter 29 of Title 6 of the South Carolina Code of Laws, among other sources, to impose land use standards in the unincorporated areas of the County; WHEREAS, County Council recognizes that there is a need to revise the law of the County to meet the changing needs of the County and that there is a need to amend, specifically, Chapters 32 and 38 of the Code of Ordinances in order to revise certain setback-related provisions, including definitions and the application thereof; and WHEREAS, County Council has therefore determined to modify Chapter s 32 and 38 of the Code of Ordinances and to affirm and preserve all other provisions of the Code of Ordinances not specifically, or by implication, amended hereby. NOW THEREFORE, it is hereby ordained by the Oconee County Council, in meeting duly assembled, that: 1. Certain provisions related to lot setbacks, as contained in Chapters 32 and 38 of the Code of Ordinances, are hereby revised, rewritten, and amended to read as set forth in Exhibit A , which is attached hereto incorporated herein by reference. Attached hereto as Exhibit B is a version of Exhibit A which reflects the changes to the prior provisions; Exhibit B is for illustrative purposes only and shall not be codified. 2. County Council hereby approves and adopts Exhibit A and directs that it be codified in the Oconee County Code of Ordinances. 3. Should any part or provision of this Ordinance be deemed unconstitutional or unenforceable by any court of competent jurisdiction, such determination shall not affect the remainder of this Ordinance, all of which is hereby deemed separable. 4. All ordinances, orders, resolutions, and actions of County Council inconsistent herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded. Nothing contained herein, however, or in the attachment hereto, shall cancel, void, or revoke, or shall be interpreted as cancelling, voiding, or revoking, ex post facto, in any regard any prior land use provision, or decision of the County or County Council based thereon, which were valid and legal at the time in effect and undertaken pursuant thereto, in any regard. 5. All other terms, provisions, and parts of the Code of Ordinances, and specifically, but without exception, the remainder of Chapters 32 and 38, not amended hereby, directly or by implication, shall remain in full force. 6. This Ordinance shall take effect and be in full force from and after third reading and enactment by County Council. ORDAINED in meeting, duly assembled, this ______ day of _________________, 2024. ATTEST: ______________________________ _______________________________ Jennifer C. Adams Matthew Durham Clerk to Oconee County Council Chair, Oconee County Council First Reading: September 17, 2024 Second Reading: October 1, 2024 Public Hearing: October 15, 2024 Third Reading: October 15, 2024 EXHIBIT A Chapter 32: Sec. 32-212. Definitions. When used in this article, the following words and terms shall have the meaning indicated. Words and terms not herein defined shall have their customary dictionary definitions. The term "shall" is mandatory. When not inconsistent with the content, words us ed in the singular number include the plural and those used in the plural number include the singular. . . . Building line (also referred to as Building setback line) means a line beyond which no part of the structure of any building shall project , unless specifically permitted in this Code of Ordinances , with the exception of subsurface projection of footings, measured perpendicular to the property line. This includes, but is not limited to, the building, eaves, porches, decks, chimneys, ba y windows, and fire escapes. . . . Flag lot means a lot shaped like a flag on a pole. The “flag” shaped area is situated behind another lot and is the portion of a flag lot where structures may be located. The “pole” shaped area is the portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See Chapter 38 for specific provisions addressing flag lots.) . . . Lot means a single parcel or tract of contiguous land intended as a unit for transfer of ownership, or for building development, or both. (1) Corner lot means a lot with frontage on at least two intersecting roads located at the point of intersection. (2) Lot depth means the mean horizontal distance between the front and rear lot lines. (3) Double frontage lot means a parcel having frontage on two or more roads which is not located at any intersection of such roads. (4) Lot width, unless indicated otherwise by context, means the straight-line distance between the points where the front building line intersects the two side lot lines. . . . Setback means the required minimum distance between every structure and the lot lines of the lot on which it is located (measured from the road right-of-way at the front of the lot if the road right- of-way projects o ver the property line, and measured from the property lines on the remaining portions of the property). . . . Setback line means the line indicating the minimum distance permitted between the property line or road right-of-way line, as applicable, and the building line. . . . Yard means a space that lies between the principal building or buildings and the nearest lot line or road right -of-way, as applicable. The minimum required yard shall be unoccupied and unobstructed from the ground upward, except as may be expressly permitted. (1) Front yard means a yard situated between the front building line and the front lot l ine or road right-of-way, as applicable, extending the full width of the lot. (2) Rear yard means a yard situated between the rear building line and the rear lot line extending the full width of the lot. (3) Side yard means a yard between the side building line and a side lot line that extends from the front yard to the rear yard. [Chapter 38 revisions on the following page] Chapter 38: Sec. 38-9.3. Dimensional requirements: General provisions and exceptions. In addition to the dimensional require ments listed below and district dimensional requirements, further dimensional requirements may be set forth in Article 5 for those uses listed as conditional. The control free district shall be exempt from the provisions of this section except provisions listed under item (2), setbacks. (1) Lot size and configuration. a. Public utilities and government. Public utilities and government uses shall not be subject to the minimum lot size requirements, but shall meet the setback requirements. b. Flag lots. Flag lots may be permitted under the following conditions: 1. The maximum length of the pole of a flag lot shall be 300 feet. 2. The minimum width of the pole of a flag lot shall be 22 feet, and the maximum width of the pole of a flag lot shall be 40 feet. 3. The front setback shall be measured from where the flag portion of the flag lot meets the district minimum width requirements. 4. The pole portion of a flag lot shall not be used to calculate area, width, or setbacks of the lot or to provide off-street parking. 5. There shall be no more than one flag lot per each four lots, per subdivision or development. Flag lot illustration: (2) Setbacks. a. The required front, side, and rear yards for individual lots shall be measured inward toward the center of said lot from all points along the respective front, side, and rear property lines of the lot, or from the road right -of-way if applicable. Once the yard areas of a given lot have been established, the remaining area of the lot which is not included in any required front, side, or rear lot shall be known as the "buildable" area within which the approved structure(s) shall be placed. b. Where a road right -of-way projects over a property line, the setback shall be measured from the road right-of-way line. c. Corner lots shall be considered to have two fronts and shall meet the front setback for the district. d. Front yard setbacks for double frontage lots shall be provided for both streets upon which the lot has frontage, and any accessory use(s) shall be prohibited from the required front yard setback of the street upon which the principal building fronts. e. For lots not meeting the required minimum lot width for the respective district at the front property line or road right -of-way, as applicable, the setback shall be measured such that the distance from the front property line or road right -of-way, as applicable, shall nonetheless be included in the measurement for the required setback. The buildable area shall not, however, include any area where the minimum lot width is not met. This provision is meant to apply to irregularly shaped lots, as generally determined by their existing lot width and c onfiguration in relation to the district minimum lot width. This provision does not apply to flag lots. See Section 38-9.3(1)(b) for flag lot provisions. f. Road design and encroachment criteria is governed by the standards in Chapter 26, of the Oconee County Code of Ordinances, as amended. g. Any garage door shall be set back a minimum of 20 feet from the property line that it faces so that vehicles may be p arked in the driveway without encroaching into the right -of-way. If the district setback is greater than 20 feet, then the more restrictive setback shall prevail. h. The side and rear setbacks in the CCD and HCD shall not apply to the shared property line of attached buildings. i. The space in any required yard shall be open and unobstructed except for the ordinary projections of window sills, cornices, eaves, window air conditioning units, and other architectural features, provided that such features shall project no more than two feet into any required yard. k. Steps and heating and cooling units may project into a required yard a distance not to exceed five feet but no closer than five feet of a property line. Fences, freestanding walls, hedges, and septic lines may be located in any setback, so long as they remain on the property. Sec. 38-12.2. Definitions. Building setbacks: The minimum distance from the property line or road right -of-way line, as applicable, to the closest projection of the exterior face of buildings, walls, or other form of construction (i.e., decks, landings, terraces, porches, and patios on grade). Building setback line (also referred to as Building line): The line beyond which no part of the structure of any building shall projec t unless specially permitted in this Code of Ordinances and with the exception of subsurface projection of footings, measured perpendicular to the property line. This includes, but is not limited to, the building, eaves, porches, decks, chimneys, bay windows, and fire escapes. Front yard setback—Shall be measured from the front property line or, if the road right - of-way projects over the front property line, then from the road right -of-way, all as shown on tax maps. Side and rear yard setbacks —Shall be m easured from the property lines as shown on tax maps. Corner lot setbacks—Shall be measured from each front property line or if a road right - of-way projects over the front property line(s), then from the road right-of-way(s). On a flag lot the building setback line runs parallel to the street and is measured from the point in the “flag” portion of the lot where the required minimum lot size is met and which is closest to the street. . . . Flag lot: A lot shaped like a flag on a pole. The “flag” shaped area is situated behind another lot and is the portion of a flag lot where structures may be located. The “pole” shaped area is the portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See Chapter 38 for specific provisions addressing flag lots.) . . . Lot, width: The straight-line distance between the points where the building setback line intersects the two side lot lines, unless indicated otherwise by context. . . . Setback: The required mini mum distance between every structure and the lot lines of the lot on which it is located (measured from the road right-of-way at the front of the lot if the road right-of- way projects over the property line, and measured from the property lines on the rema ining portions of the property). . . . Yard: Yard means a space that lies between the principal building or buildings and the nearest lot line or road right -of-way, as applicable. The minimum required yard shall be unoccupied and unobstructed from the ground upward, except as may be expressly permitted. (1) Front yard means a yard situated between the front building line and the front lot line or road right-of-way, as applicable, extending the full width of the lot. (2) Rear yard means a yard situated between the rear building line and the rear lot line extending the full width of the lot. (3) Side yard means a yard between the side building line and a side lot line that extends from the front yard to the rear yard. EXHIBIT B Chapter 32: Sec. 32-212. Definitions. When used in this article, the following words and terms shall have the meaning indicated. Words and terms not herein defined shall have their customary dictionary definitions. The term "shall" is mandatory. When not inconsistent with the content, words used in the singular number include the plural and those used in the plural number include the singular. . . . Building line (also referred to as Building setback line) means a line beyond which no part of the structure of any building shall project , unless specifically permitted in this Code of Ordinances , with the exception of subsurface projection of footings, measured perpendicular to the property line. This includes, but is not limited to, the building, eaves, porches, decks, chimneys, bay windows, and fire escapes. . . . Flag lot means a lot shaped like a flag on a pole. The “flag” shaped area is situated behind another lot and is the portion of a flag lot where structures may be located. The “pole” shaped area is the portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See Chapter 38 for specific provisions addressing flag lots.) . . . Lot means a single parcel or tract of contiguous land intended as a unit for transf er of ownership, or for building development, or both. (1) Corner lot means a lot with frontage on at least two intersecting roads located at the point of intersection. (2) Lot depth means the mean horizontal distance between the front and rear lot lines. (3) Double frontage lot means a parcel having frontage on two or more roads which is not located at any intersection of such roads. (4) Lot width, unless indicated otherwise by context, means the straight-line distance between the points where the front building line intersects the two side lot lines. the horizontal distance between the side lot lines at the building setback line measured parallel with the front lot line or in the case of a curvilinear road measured parallel to the chord of the arc between the intersection of the side lot lines and the road right-of-way line. . . . Setback means the required minimum distance between every structure and the lot lines of the lot on which it is located (measured from the road right-of-way at the front of the lot if the road right- of-way projects over the property line, and measured from the property lines on the remaining portions of the property). . . . Setback line means the line indicating the minimum distance permitted between the property line or road right-of-way line, as applicable, and the building line. . . . Yard means a space that lies between the on the same lot with a principal building or buildings and the nearest lot line or road right-of-way, as applicable. The minimum required yard shall be unoccupied and unobstructed from the ground upward, except as may be expressly permittedopen, unoccupied, and unobstructed by buildings or structures from ground to sky except where encroachments and accessory buildings and structures are expressly permitted. (1) Front yard means a yard situated between the front building line and the front lot line or road right-of-way, as applicable, extending the full width of the lot. (2) Rear yard means a yard situated between the rear building line and the rear lot line extending the full width of the lot. (3) Side yard means a yard between the side building line and a side lot line that extends from the front yard to the rear yard. [Chapter 38 revisions on the following page] Chapter 38: Sec. 38-9.3. Dimensional requirements: General provisions and exceptions. In addition to the dimensional requirements listed below and district dimensional requirements, further dimensional requirements may be set forth in Article 5 for those uses listed as conditional. The control free district shall be exempt from the provisions of this section. The control free district shall be exempt from the provisions of this section except provisions listed under item (2), setbacks. (1) Lot size and configuration. a. Public utilities and government. Public utilities and government uses shall not be subject to the minimum lot size requirements, but shall meet the setback requirements. b. Flag lots . A flag lot shall contain no more than two single -family dwellings and uninhabited accessory structures. Flag lots may be permitted under the following conditions: 1. The maximum flagpole length of the pole of a flag lot shall be 300 feet. 2. The minimum flagpole width of the pole of a flag lot shall be 2230 feet, and the maximum width of the pole of a flag lot shall be 40 feet. 3. The front setback shall be measured from where the flag portion of the flag lot meets the district minimum width requirements. 4. The flagpole portion of a the flag lot shall not be used to calculate ar ea, width, or setbacks of the lot or to provide off-street parking. 5. There shall be no more than one flag lot per each four lots, per subdivision or development. Flag lot illustration: (2) Setbacks. a. The required front, side, and rear yards for individual lots shall be measured inward toward the center of said lot from all points along the respective front, side, and rear property lines of the lot, or from the road right -of-way if applicable. Once the yard areas of a given lot have been established, the remaining area of the lot which is not included in any required front, side, or rear lot shall be known as the "buildable" area within which the approved structure(s) shall be placed. b. Where a property abuts a road street right-of-way projects over a property line, the setback shall be measured from the road right-of-way line. c. Corner lots shall be considered to have two fronts and shall meet the front setback for the district. d. Front yard setbacks for double frontage lots shall be provided for both streets upon which the lot has frontage, and any accessory use(s) shall be prohibited from the required front yard setback of the street upon which the principal building fronts. e. For lots not meeting the required minimum lot width for the respective district at the front property line or road right -of-way, as applicable, the setback shall be measured such that the distance from the front property line or road right -of-way, as applicable, shall nonetheless be included in the measurement for the required setback. The buildable area shall not, however, include any area where the minimum lot width is not met. This provision is meant to apply to irregularly shaped lots , as generally determined by the ir existing lot width and configuration in relation to the district minimum lot width. This provision does not apply to flag lots . See Section 38-9.3(1)(b) for flag lot provisions. fe. Road design and encroachment criteria is governed by the standards in Chapter 26, of the Oconee County Code of Ordinances, as amended. gf. Any garage door shall be set back a minimum of 20 feet from the property line that it faces so that vehicles may be parked in the driveway without encroaching into the right-of-way. If the district setback is greater than 20 feet, then the more restrictive setback shall prevail. hg. The side and rear setbacks in the CCD and HCD shall not apply to the shared property line of attached buildings. ih. The space in any required yard shall be open and unobstructed except for the ordinary projections of window sills, cornices, eaves, window air conditioning units, and other architectural features, provided that such features shall project no more than two feet into any required yard. ki. Steps and heating and cooling units may project into a required yard a distance not to exceed five feet but no closer than five feet of a property line. Fences, freestanding walls, hedges, and septic lines may be located in any setback, so long as they remain on the property. Sec. 38-12.2. Definitions. Building setbacks: The minimum distance from the property line or road right -of-way line, as applicable, to the closest projection of the exterior face of buildings, walls, or other form of construction (i.e., decks, landings, terraces, porches, and patios on grade). Building setback line (also referred to as Building line): The line beyond which no part of the structure of any building shall project unless specially permitted in this Code of Ordinances and with the exception of subsurface projection of footings, measured perpendicular to the property line. This includes, but is not limited to, the building, eaves, porches, decks, chimneys, bay windows, and fire escapes. Building setback line: The line on the front, rear, and sides of a lot, set according to the district regulations, which delineates the areas upon which a structure may be built or maintained. At the time of application, all yard setbacks are determined from the most recent Oconee County Ta x Map. Front yard setback—Shall be measured from the front property line or, i f the roadway right-of-way projects over the front property line, then from the road right-of-way, all as shown on tax maps. Side and rear yard setbacks —Shall be measured from the property lines as shown on tax maps. Corner lot setbacks—Shall be measured from each front property line or if a the roadway right-of-ways projects over the front property line (s), then from the road right -of- way(s)it is adjacent to. On a flag lot the "building setback line" runs parallel to the street and is measured from the point in the “flag” main portion of the lot where the required minimum lot size is met and (i.e. the "flag" part of the lot, not the "pole" part), which is closest to the street. (The minimum lot width must be met in this area, as well. Therefore, if the point closest to the street is a corner rather than a line, the setback will have to extend as far as necessary to meet the required minimum lot width!) . . . Flag lot: A lot shaped like a flag on a pole. The “flag” shaped area is situated behind another lot and is the portion of a flag lot where structures may be located. The “pole” shaped area is the portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See Chapter 38 for specific provisions addressing flag lots.) . . . Lot, width: The straight linestraight-line distance between the point s where the building setback line intersects the two side lot lines, unless indicated otherwise by context. . . . Setback: The required minimum distance between every structure and the lot lines of the lot on which it is located (measured from the road right-of-way at the front of the lot if the road right-of- way projects over the property line, and measured from the property lines on the remaining portions of the property). The required minimum distance between every structure and the lot lines of the lot on which it is located (measured from the road right -of-way in the front and property lines on the remaining portions of the property). . . . Yard: Yard: An open space that lies between the principal building or buildings and the nearest lot line. The minimum required yard as set forth in this chapter is unoccupied and unobstructed from the ground upward, except as may be expressly permitted. Yard, front (highway yard): A yard across the full width of the lot extending from the front line of the building. Yard, rear: A yard extending across the full width of the lot and measured between the rear line of the lot and the rear line of the main building. Yard, side: An open space on the same lot with a building, between the building and the side line of the lot, extending through, from the front building line, to the rear of the lot. Yard means a space that lies between the principal building or buildings and the nearest lot line or road right -of-way, as applicable. The minimum required yard shall be unoccupied and unobstructed from the ground upward, except as may be expressly permitted. (1) Front yard means a yard situated between the front building line and the front lot line or road right-of-way, as applicable, extending the full width of the lot. (2) Rear yard means a yard situated between the rear building line and the rear lot line extending the full width of the lot. (3) Side yard means a yard between the side building line and a side lot line that extends from the front yard to the rear yard. Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 17, 2024 COUNCIL MEETING TIME: 6:00 PM ITEM TITLE [Brief Statement]: Council discussion and consideration of the submission of the FY 2024 National Dam Safety Program Rehabilitation of High Hazard Potential Dam (HHPD) grant application to the South Carolina Department of Environmental Services on behalf of the Chattooga Lake Club. BACKGROUND DESCRIPTION: • Through the Rehabilitation of High Hazard Potential Dams (HHPD) Grant Program, FEMA’s National Dam Safety Program (NDSP) has made federal funds available to states for FFY24 for pass through to non-Federal governmental organizations or nonprofit organizations to rehabilitate eligible HHPDs that fail to meet minimum state dam safety standards and pose an unacceptable risk to life and property. The Chattooga Lake Club is a private organization, as is the dam in consideration. • Eligible applicants may choose to sponsor a privately-owned dam solely at its own discretion and at its own risk. • DES is in the process of applying for the FFY24 grant and, if receiving funds, will offer subawards to eligible applicants for activities that promote the goals of the federal grant program. • A privately-owned dam may be eligible, but the owner cannot apply directly. A non-federal government (i.e., state, county, municipal) or a 501(c)(3) non-profit organization are the only entities eligible to apply. • Subawards require a match of at least 35% in the form of non-federal funds and/or in-kind services. • The tentative deadline to submit application to DES is November 1, 2024. • All applicable federal standards and requirements must be satisfied for the awarded HHPD grant and any subawards. Failure to comply with federal grant requirements in the execution of a grant award may result in termination of the grant agreement and collection of some or all federal funds received. • Oconee County, as the applicant, is responsible for meeting all match / grant requirements, including procurement, records management, and legal fees if Chattooga Lake Club is unable to meet the requirements. SPECIAL CONSIDERATIONS OR CONCERNS [only if applicable]: FINANCIAL IMPACT [Brief Statement]: • The estimated costs for the project total $1,165,000. • If awarded, Chattooga Lake Club will provide a 39% non-federal match to meet the requirements under the grant program. Any costs above the estimated amount will also be the responsibility of Chattooga Lake Club. • The grant requires a legally enforceable covenant or agreement between the dam owner and Oconee County, the local government with jurisdictional authority under the National Flood Insurance Program that ensures that the feature will be maintained by the eligible subrecipient or state if not maintained according to the Operation and Maintenance Plan by the dam owner. • Oconee County legal support will be required to draw up the legally enforceable covenant or agreement. • A licensed Professional Engineer (PE) registered in South Carolina must assist in the preparation of your subaward grant application. • Engineering services funded from a HHPD grant must be procured in compliance with all federal and state procurement requirements and the applicant’s own procurement policies. ATTACHMENTS: Chattooga Lake Club submitted budget Chattooga Lake Club Request for Support FY 2024 Rehabilitation of High Hazard Potential Dams (HHPD) Notice of Funding Opportunity Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. STAFF RECOMMENDATION [Brief Statement]: It is the staff’s recommendation that Council consider the submission of the FY 2024 National Dam Safety Program Rehabilitation of High Hazard Potential Dam (HHPD) grant application to the South Carolina Department of Environmental Services. Prepared by: Approved for Submittal to Council: __________________________ _____________________________________ Brittney Martin, Grants Administrator Amanda F. Brock, County Administrator Chattooga Lake Dam, located in Mountain Rest, SC, will install a new primary spillway system including an intake structure and main drain. The original spillway system is deteriorating and no longer meets current regulatory safety standards. To mitigate against dam failure, the original system will be sealed after the new primary system is completed. This project will protect downstream population, structures and infrastructure from potential flooding, while protecting the water source for firefighting resources, recreational use and wildlife. In working with Oconee County, SC as the Subrecipient, Chattooga Lake Club applied for and received Project Scoping High Hazard Potential Dam (HHPD) grant funds to cover the costs of engineering studies and design. Memorandum of Understanding (MOU) between Oconee County and Chattooga Lake Club was approved November 4, 2022. Sub Award Agreement between SC Department of Health and Oconee County, SC Agreement # EQ-3-591 was approved January 6, 2023. The new primary spillway system has been recommended as a long-term solution by Howard Leonard P .E., Peritus Civil, Inc. Chattooga Lake Club is requesting Oconee County’s support as Subrecipient to apply for HHPD grant funds for the construction phase, including: 1. Operations and Maintenance Plan legally enforceable covenant or agreement between County and Chattooga Lake Club 2. Floodplain Management PLAN developed for Chattooga Lake Dam no later than 1 year after award agreement and implemented no later than 1 year after project completion 3. Assurance Statements/Certifications 4. Solicit bids following County Procurement Policy Estimated costs for the project are $1,165MM. If awarded, Chattooga Lake Club will provide Non-Federal Cost Share of 39% and FEMA will provide the balance. 1 The Department of Homeland Security (DHS) Notice of Funding Opportunity (NOFO) Fiscal Year 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) SUMMARY OVERVIEW OF KEY INFORMATION FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) REHABILITATION OF HIGH HAZARD POTENTIAL DAMS (HHPD) Program The Rehabilitation of High Hazard Potential Dams (HHPD) Grant Overview Program makes available federal funds to eligible states for pass through to non-Federal governmental organizations or nonprofit organizations for the rehabilitation of eligible high hazard potential dams that fail to meet minimum state dam safety standards and pose unacceptable risk to life and property. For the purposes of the HHPD Grant Program, rehabilitation means the repair, replacement, reconstruction, or removal of a dam to meet applicable state dam safety and security standards. The Fiscal Year 2024 Fall HHPD grant is available to support two categories of funding: (1) Project Scoping, Engineering and Design and (2) Construction Projects. Goals and Objective Reduce or eliminate risk of eligible high hazard potential dams. The HHPD grant program incentivizes eligible states to: • Provide financial assistance for repair, removal, or rehabilitation of eligible high hazard potential dams. • Incorporate risk-informed analysis and decision making into their dam safety practice and HHPD rehabilitation investments. • Incorporate risk-analysis results and information and consider all dam risk in state, local, Tribal, and territorial mitigation planning. • Promote community preparedness by requiring recipients to develop and implement floodplain management plans that address potential measures, practices, and policies to reduce loss of life, injuries, damage to property and facilities, public expenditures, and other adverse effects of flooding. • Reduce costs associated with dam rehabilitation through the deployment of innovative solutions and technologies. Eligible Projects HHPD grants assistance to high hazard dams listed in the National Inventory of Dams with a condition assessment of Poor or FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 2 Unsatisfactory and dams in Fair condition with a population at risk (PAR) at or above one thousand. HHPD funds the following activities: • Rehabilitation (Repair, Replacement, Reconstruction, or Removal) of eligible high hazard potential dams • Any other structural or nonstructural measures to rehabilitate an eligible high hazard potential dam. At project sites where Bipartisan Infrastructure Law (BIL) funding is being used for hazard mitigation projects, the use of public signage is a way to inform taxpayers about how BIL funds are being spent and advance the goals of accountability and transparency in federal spending. For more information on the federal government’s signage initiative relating to infrastructure investments, see the Office of Management and Budget’s February 24, 2023, Controller Alert, “CA - 23-6, Enhancing Transparency Through Use of the Investing in America Emblem on Signs (UPDATED).” OMB’s Controller Alert. If an HHPD applicant does not have a state mitigation plan that includes all dam risks, the applicant may request an extension to meet this requirement. (See Section H.13., Mitigation Plan Requirement Extension Requests). Additionally, for construction projects that are not funded by the BIL, publicly visible signage identifying the NDSP / HHPD funding source of the project promotes public awareness, participation in the program, and investment in building a resilient nation. Deadlines NOFO Availability Window Start Date: 11/06/2023 09:00:00 AM ET NOFO Availability Window End Date: 02/29/2024 Applicant Eligibility Period Start Date: Period of Performance starts when grant is awarded (signed, obligated, and notified to recipient) Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET Funding Amount Available Funding for the NOFO: $185,120,000.00 Eligible Applicants • States • District of Columbia • U.S. territories Cost Share Assistance provided under the HHPD grant is subject to a non-Federal cost-sharing requirement of not less than 35 percent. Federal funding is available for up to 65 percent of the eligible activity costs. The remaining 35 percent of eligible activity costs must be derived from non-federal sources, which may be in-kind. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 3 Requirements for cash and third-party in-kind contributions can be found in 2 Code of Federal Regulations § 200.306. The non-Federal cost share contribution is not limited to 35 percent. All entities wishing to do business with the federal government must have a unique entity identifier (UEI). The UEI number is issued by the system. Requesting a UEI using Sam.gov can be found at: Grants.gov registration information can be found at: https://www.grants.gov/web/grants/register.html. Planned UEI Updates in Grant Application Forms: On April 4, 2022, the Data Universal Numbering System (DUNS) Number was replaced by a new, non-proprietary identifier requested in, and assigned by, the System for Award Management (SAM.gov). This new identifier is the Unique Entity Identifier (UEI). Additional Information can be found on Grants.gov: https://www.grants.gov/web/grants/forms/planned-uei-updates.html Contents Planned UEI Updates in Grant Application Forms: ....................................................................... 3 A. Program Description................................................................................................................ 7 1. Issued By.......................................................................................................................... 7 2. Assistance Listings Number ............................................................................................ 7 3. Assistance Listings Title.................................................................................................. 7 4. Funding Opportunity Title ............................................................................................... 7 5. Funding Opportunity Number.......................................................................................... 7 6. Authorizing Authority for Program ................................................................................. 7 7. Appropriation Authority for Program.............................................................................. 7 8. Announcement Type........................................................................................................ 7 9. Program Category ............................................................................................................ 7 10. Program Overview, Objectives, and Priorities ................................................................ 7 11. Performance Measures..................................................................................................... 9 B. Federal Award Information ..................................................................................................... 9 1. Available Funding for the NOFO: $185,120,000.00...................................................... 9 2. Projected Number of Awards: 50 ................................................................................ 10 3. Period of Performance: 36 Months ............................................................................ 10 4. Funding Instrument Type: Grant .................................................................... 10 C. Eligibility Information........................................................................................................... 10 1. Eligible Applicants......................................................................................................... 10 2. Applicant Eligibility Criteria ......................................................................................... 10 3. Subrecipient Eligibility Criteria..................................................................................... 11 4. Other Program-Specific Eligibility Criteria................................................................... 12 5. Cost Share or Match....................................................................................................... 15 D. Application and Submission Information.............................................................................. 16 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 4 1. Key Dates and Times..................................................................................................... 16 a. Application Start Date: 11/06/2023 at 09:00:00 AM ET ...................................... 16 b. Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET ....................... 16 c. Anticipated Funding Selection Date: No later than 03/25/2024 .......................... 17 d. Anticipated Award Date: No later than 04/08/2024 ............................................. 17 e. Other Key Dates ........................................................................................................ 17 2. Agreeing to Terms and Conditions of the Award.......................................................... 17 3. Address to Request Application Package ...................................................................... 17 4. Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award Management (SAM), and Submit an Application ......................................................... 17 5. Electronic Delivery ........................................................................................................ 19 6. How to Register to Apply .............................................................................................. 19 a. General Instructions: ................................................................................................. 19 b. Obtain a UEI Number: .............................................................................................. 19 c. Obtain Employer Identification Number:.................................................................. 19 d. Create a login.gov account: ....................................................................................... 20 e. Register with SAM:................................................................................................... 20 f. Register in FEMA GO, Add the Organization to the System, and Establish the AOR: 21 7. Submitting the Application............................................................................................ 21 8. Timely Receipt Requirements and Proof of Timely Submission .................................. 21 9. Content and Form of Application Submission............................................................... 22 a. Standard Required Application Forms and Information ........................................... 22 b. Program-Specific Required Forms and Information ................................................. 23 10. Other Submission Requirements.................................................................................... 24 11. Intergovernmental Review............................................................................................. 25 12. Funding Restrictions and Allowable Costs.................................................................... 25 a. Requirements Related to Contractor and Subcontractor Wages ............................... 26 b. Requirements Related to Contract and Subcontract Services ................................... 26 c. Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services ................................................................................................... 26 d. Enhancing Critical Infrastructure Cybersecurity....................................................... 28 e. Pre-Award Costs........................................................................................................ 28 f. Management and Administration (M&A) Costs ....................................................... 28 g. Indirect Facilities & Administrative (F&A) Costs .................................................... 28 E. Application Review Information........................................................................................... 29 1. Application Evaluation Criteria ..................................................................................... 29 a. Programmatic Criteria for Mitigation Plan Requirement.......................................... 29 b. Financial Integrity Criteria ........................................................................................ 30 c. Supplemental Financial Integrity Criteria and Review ............................................. 31 2. Review and Selection Process ....................................................................................... 31 F. Federal Award Administration Information.......................................................................... 32 1. Notice of Award............................................................................................................. 32 2. Pass-Through Requirements .......................................................................................... 32 3. Administrative and National Policy Requirements........................................................ 33 a. DHS Standard Terms and Conditions ....................................................................... 33 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 5 b. Ensuring the Protection of Civil Rights .................................................................... 33 c. Environmental Planning and Historic Preservation (EHP) Compliance................... 34 d. Good Jobs .................................................................................................................. 35 4. Reporting........................................................................................................................ 35 a. Financial Reporting Requirements............................................................................ 36 b. Programmatic Performance Reporting Requirements ............................................... 36 c. Closeout Reporting Requirements............................................................................. 37 d. Additional Reporting Requirements .......................................................................... 39 5. Monitoring and Oversight.............................................................................................. 40 G. DHS Awarding Agency Contact Information ....................................................................... 41 1. Contact and Resource Information ................................................................................ 41 a. Program Office Contact............................................................................................. 41 FEMA Grants News....................................................................................................... 41 c. Grant Programs Directorate (GPD) Award Administration Division ....................... 41 d. FEMA Regional Offices ............................................................................................ 42 e. Equal Rights .............................................................................................................. 43 f. Environmental Planning and Historic Preservation .................................................. 43 2. Systems Information ...................................................................................................... 43 a. Grants.gov ................................................................................................................. 43 b. Payment and Reporting System (FEMA GO) ........................................................... 43 c. FEMA Grant Outcomes (GO) ................................................................................... 43 H. Additional Information.......................................................................................................... 44 I. Termination Provisions.................................................................................................. 44 a. Noncompliance.......................................................................................................... 44 b. With the Consent of the Recipient ............................................................................ 44 c. Notification by the Recipient .................................................................................... 44 2. Program Evaluation.......................................................................................................... 44 3. Period of Performance Extensions................................................................................. 45 4. Disability Integration....................................................................................................... 46 5. Conflicts of Interest in the Administration of Federal Awards or Subawards............... 47 6. Procurement Integrity .................................................................................................... 47 a. Important Changes to Procurement Standards in 2 C.F.R. Part 200 ......................... 48 b. Competition and Conflicts of Interest ....................................................................... 48 c. Supply Schedules and Purchasing Programs............................................................. 50 d. Procurement Documentation ..................................................................................... 51 7. FEMA Financial Assistance Programs for Infrastructure ................................................ 52 Build America, Buy America Act.................................................................................. 52 8. Record Retention ........................................................................................................... 53 a. Record Retention Period ........................................................................................... 53 b. Types of Records to Retain ....................................................................................... 54 9. Actions to Address Noncompliance............................................................................... 55 10. Audits............................................................................................................................. 56 11. Payment Information ..................................................................................................... 57 12. Whole Community Preparedness................................................................................... 57 13. Example Mitigation Plan Extension Request Template.................................................. 58 14. Examples Using Funding Formula.................................................................................. 59 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 6 15. Determination of Unacceptable Risk to the Public ......................................................... 61 16. Eligible Activities............................................................................................................ 61 17. Floodplain Management Plan.......................................................................................... 63 18. Definitions ....................................................................................................................... 65 19. Appendices ..................................................................................................................... 67 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 7 A. Program Description 1. Issued By U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA)/ Resilience, Risk Management Directorate/Planning, Safety and Building Science Division / Planning and Safety Branch, National Dam Safety Program Office (NDSP) 2. Assistance Listings Number 97.041 3. Assistance Listings Title National Dam Safety Program 4. Funding Opportunity Title Fiscal Year 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) 5. Funding Opportunity Number DHS-24-[MT]-[041]-[00]-[98] 6. Authorizing Authority for Program National Dam Safety Program Act (Public Law No. 92-367, as amended, 33 U.S.C. § 467f-2) 7. Appropriation Authority for Program Infrastructure Investment and Jobs Act, Division J, Title V, Protection, Preparedness, Response, and Recovery, Federal Emergency Management Agency, Federal Assistance (Public Law No. 117-58) 8. Announcement Type Initial 9. Program Category Mitigation 10. Program Overview, Objectives, and Priorities a. Overview FEMA’s National Dam Safety Program (NDSP) is committed to protecting lives and property from the risks associated with dams. Under NDSP, the Rehabilitation of High Hazard Potential Dams (HHPD) Grant Program makes available federal funds to eligible states for pass through to non-Federal governmental organizations or nonprofit organizations for the rehabilitation of eligible high hazard potential dams that fail to meet minimum state dam safety standards and pose unacceptable risk to life and property. For the purposes of the HHPD Grant Program, rehabilitation means the repair, replacement, reconstruction, or removal of a dam that is carried out to meet applicable state dam safety and security standards. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 8 The Fiscal Year 2024 Fall HHPD grant is available to support two categories of funding: (1) Project Scoping, Engineering and Design and (2) Construction Projects. The HHPD grant program incentivizes eligible states to: • Provide financial assistance for repair, removal, or rehabilitation of eligible high hazard potential dams. • Incorporate risk-informed analysis and decision making into their dam safety practice and HHPD rehabilitation investments. • Incorporate risk-analysis results and information and consider all dam risk in state, local, tribal, and territorial mitigation planning. • Promote community preparedness by requiring recipients to develop and implement floodplain management plans that address potential measures, practices, and policies to reduce loss of life, injuries, damage to property and facilities, public expenditures, and other adverse effects of flooding. • Reduce costs associated with dam rehabilitation through the deployment of innovative solutions and technologies. Given the requirements of this grant (e.g., National Flood Insurance Program participation, state, and local hazard mitigation plans (HMP), floodplain management plan, risk prioritization, state dam safety agency approval of the award), applicants must pursue this grant in coordination with the State Dam Safety Officer and the State Hazard Mitigation Officer, regardless of which entity will implement the grant. Contact information for the State Hazard Mitigation Officers (SHMOs) is provided on the FEMA website at http://www.fema.gov/state-hazard-mitigation-officers. The HHPD supports DHS Strategic Goal 5: Strengthen Preparedness and Resilience, Objective 5.1: Build a National Culture of Preparedness and Presidential Policy Directive 8: Build and Sustain National Preparedness. Specifically, the HHPD supports Sub-Objective 5.1.1 of Strategic Goal 5 to incentivize investments that reduce risk and increase pre-disaster mitigation, including expanding the use of insurance to manage risk. DHS Strategic Plan, Fiscal years 2020-2024 has identified strengthening national preparedness and resilience as one of the basic Homeland Security missions. This initiative supports this mission by providing grant assistance for eligible high hazard potential dams that pose an unacceptable risk to the public. This program also supports Goal 2: Lead Whole of Community in Climate Resilience, Objective 2.3, Empower Risk-Informed Decision Making, of the 2022-2026 FEMA Strategic Plan. b. Objectives The objective of the program is to: Reduce or eliminate risk of eligible high hazard potential dams. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 9 c. Priorities For FY2024, the HHPD priorities are Rehabilitation Planning, Design, Re-construction, and Removal activities for eligible high hazard dams. 11. Performance Measures The following list provides Performance Measures aligned with Program Objectives and associated eligible activities. Applicants may choose one or more activities from the list below. Applicants may propose additional activities to support the program objectives; however, applicants must discuss additional activities with the FEMA Program Officer for approval and inclusion into the workplan. Program Objective: Reduce or eliminate risk of eligible high hazard potential dam (HHPD) Performance Measures 1.1 Planning tasks and activities, studies and analysis for pre-construction phases, scoping activities, and permit applications. Performance Measure 1.1: Number of eligible HHPD dams that have resulted in the completion of studies and analysis for pre-construction phases, scoping activities, and permit applications. 1.2 Preliminary and final design package and required permit approvals. Performance Measure 1.2: Number of eligible HHPD dams that have resulted in the completion of preliminary and final engineering design package and permits. 1.3 Construction activities that support dam rehabilitation or removal projects. Performance Measure 1.3: Number of eligible HHPD dams that result in construction projects for dam rehabilitation or removal. Applicants are to establish Performance Measurement targets for activities submitted for funding under this award. See Appendix A: FY24 Performance Measure Targets. B. Federal Award Information 1. Available Funding for the NOFO: $185,120,000.00 The allocation of available HHPD grant funds is determined by 33 U.S.C § 467f- 2(g)(2) Allocation of Funds. The allocation of the HHPD funds is calculated as follows: (i) Equal distribution One-third of the available funding will be distributed equally among states FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 10 in which the projects for which eligible applications are submitted are located. (ii) Need-based Two-thirds of the available funding will be distributed among states in which the projects for which eligible applications are submitted are located based on the proportion that: a. the number of eligible high hazard potential dams in the state; bears to b. the number of eligible high hazard potential dams in all such states. 2. Projected Number of Awards: 50 3. Period of Performance: 36 Months The Period of Performance (POP) is 36 months, starting on the date of the Recipient’s federal award. Given the complexity of the HHPD projects, the Recipient may submit a request for an extension to the period of performance, which is allowed under HHPD. For additional information on period of performance extensions, please refer to Section H.3, Period of Performance Extensions. FEMA awards under most programs, including this program, only include one budget period, so it will be same as the period of performance. See 2 Code of Federal Regulations § 200.1 for definitions of “budget period” and “period of performance.” 4. Funding Instrument Type: Grant C. Eligibility Information 1. Eligible Applicants A state with a state dam safety program authorized by state legislation is the only entity eligible to submit HHPD applications to DHS/FEMA. For the purposes of the HHPD, the term “state” means each of the several states of the United States, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, the Commonwealth of the Northern Mariana Islands, and any other territory or possession of the United States. 2. Applicant Eligibility Criteria Each eligible state must designate one State Administrative Agency (SAA) to serve as the applicant for HHPD funding. Each SAA may submit only one (1) HHPD grant application to FEMA and be able to comply with regulations associated with receipt of federal financial contributions from FEMA. Each Recipient must have a FEMA-approved state mitigation plan that includes all dam risks; and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552) that amended the Robert T. Stafford Disaster Relief and Emergency Assistance Act, FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 11 PL 100-707. For more information on the Mitigation Plan Requirements, see Section E.1.a, Programmatic Criteria for Mitigation Plan Requirement. For links to mitigation plan guidance documents and for questions, see Section H.12., Mitigation Plan Requirement Resources. 3. Subrecipient Eligibility Criteria Eligible subrecipients under Fiscal Year 2024 HHPD are non-federal governmental organizations (other than the designated applicant) and nonprofit organizations. Under FY 2024 HHPD, eligible subrecipients apply for and receive subawards directly from the SAA. Subrecipients must meet the following criteria to be eligible: a. Acts in accordance with the state dam safety program. Additionally, the project dam must be regulated by the state dam safety program. All activities must be approved by the state dam safety agency. Any engineering studies, plans, or design drawings and specifications must be approved, signed, and stamped by a qualified design professional registered in the state in which the project is located. b. The community in which the dam is located participates in, and complies with, all applicable regulations of the National Flood insurance Program, and is in good standing, not on probation, suspended, or withdrawn from such Program. c. The Tribal or local government with jurisdiction over the area in which the dam is located has in place an approved hazard mitigation plan that includes all dam risks and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). For more information on the Mitigation Plan Requirements, see Section E.1.a., Programmatic Criteria for Mitigation Plan Requirement. If the Tribal or local mitigation plan does not include all dam risks, the subrecipient may request an extension to meet this requirement. For more information on the Mitigation Plan Requirements, see Section H.13, Mitigation Plan Requirement Extension Requests. For links to mitigation plan guidance documents and for questions, see Section H.12., Mitigation Plan Requirement Resources. (FEMA’s Mitigation Planning Program defines “local government” as any county, municipality, city, town, township, public authority, school district, special district, intrastate district, council of governments (regardless of whether the council of governments is incorporated as a nonprofit corporation under State law), regional or interstate government entity, or agency or instrumentality of a local government; any Indian tribe or authorized tribal organization, or Alaska Native village or organization; and any rural community, unincorporated town or village, or other public entity” (44 Code of Federal Regulations § 201.2).) d. Commit to provide operation and maintenance of the project for the expected life of the dam following completion of rehabilitation. e. Carries out activities relating to the public in the area around the dam in accordance with the hazard mitigation plan. f. Complies with section 5196(j)(9) of title 42 of the U.S. Code (as in effect on December 16, 2016) with respect to projects receiving assistance under this section in the same manner as FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 12 recipients are required to comply in order to receive financial contributions from the Administrator for emergency preparedness purposes. See Section D.13.a., Requirements Related to Contractor and Subcontractor Wages, for additional information. g. Complies with chapter 11 of the title 40, Selection of Architects and Engineers. (See Section D.13.b., Requirements Related to Contract and Subcontract Services.) h. Have in place (or will be developed not later than 2 years after the date of execution of a dam rehabilitation or removal project agreement and implemented not later than 2 years after the date of completion of a project) a floodplain management plan to reduce the impacts of future flood events in the area impacted by the project. The floodplain management plan shall address: 1. potential measures, practices, and policies to reduce loss of life, injuries, damage to property and facilities, public expenditures, and other adverse impacts of flooding in the area protected by the project. 2. plans for flood fighting and evacuation; and 3. public education and awareness of flood risks. For additional information, please see Section H.17., Floodplain Management Plan. i. For the purposes of the HHPD program, all dam risk includes the incremental risk, non- breach risk, and residual risk associated with each eligible high hazard potential dam, as well as the reason(s) the state has determined the dam is an eligible high hazard potential dam. For the purposes of meeting the mitigation planning requirements, Applicants (SAA) must address the requirements for state mitigation plans and subrecipients / jurisdictions where the dam is located must address the requirements for local or tribal mitigation plans as set forth in mitigation planning policies. The requirements include the planning process, risk assessment, goals, and mitigation strategy. In the mitigation planning risk assessment, including all dam risks is done at a scale appropriate to the planning area and should include descriptions of incremental, breach, and non-breach risks for high hazard potential dams (not limited to eligible) as described in Section 5.8 of the Rehabilitation of High Hazard Potential Dams Grant Program Guidance (June 2020) FEMA Policy FP 104-008-7. “ j. Bipartisan Infrastructure Law (BIL) Signage FEMA encourages the use of public signage for Bipartisan Infrastructure Law funded projects. Please note, these actions highly are encouraged but are not required. Subrecipients are encouraged to place signs at project sites identifying the funding source of the project. The cost of such signs is an eligible project cost. Sub applicants may request up to $10,000 per project for costs relating to signage. Project costs for signage are subject to the applicable cost-sharing requirements. For assistance with template design, please email: design@fema.dhs.gov. 4. Other Program-Specific Eligibility Criteria FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 13 a. Approved Hazard Mitigation Plan The state must have in place (by the application deadline and at the time of obligation of grant funds) an approved state hazard mitigation plan that includes all dam risks (See Section H.19., Definitions, for the definition of All Dam Risk) and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). If an HHPD applicant does not have a state mitigation plan that includes all dam risks, the applicant may request an extension to meet this requirement. (See Section H.13., Mitigation Plan Requirement Extension Requests). b. Allowable Activities See Section H.17., Eligible Activities, for more information on allowable activities. See Section D.13.b., Requirements Related to Contract and Subcontract Services, for information about funding restrictions. At project sites where BIL funding is being used for hazard mitigation projects, the use of public signage is a way to inform taxpayers about how BIL funds are being spent and advance the goals of accountability and transparency in federal spending. For more information on the federal government’s signage initiative relating to infrastructure investments, see the Office of Management and Budget’s February 24, 2023, Controller Alert, “CA-23-6, Enhancing Transparency Through Use of the Investing in America Emblem on Signs (UPDATED).” Additionally, for construction projects that are not funded by the BIL, publicly visible signage identifying the National Dam Safety Program HHPD funding source of the project promotes public awareness, participation in the program, and investment in building a resilient nation. c. List of Eligible High Hazard Dams The SAA must submit a list of all eligible high hazard potential dams in their state with the application. The SAA must submit an official assurance statement (signed by the State Dam Safety Officer or Governor's Authorized Representative [GAR]) that all dams included on the list of eligible high hazard potential dams are regulated by the state dam safety program and meet the following HHPD criteria for eligible high hazard potential dams. A dam considered as eligible under grant must meet the following criteria: “(A) In general, the term “eligible high hazard potential dam” means a non-Federal dam that— (i) is located within a state with a state dam safety program and regulated under that state dam safety program; (ii) is classified as high hazard potential by the relevant state dam safety agency; (iii) has an emergency action plan that— I. is approved by the relevant state dam safety agency; or II. is in conformance with state law and pending approval by the relevant state dam safety agency; (iv) fails to meet minimum dam safety standards of the state in which the dam is located, as determined by the state dam safety agency; FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 14 (v) and has a condition assessment rating of POOR or UNSATISFACTORY as identified in the National Inventory of Dams (NID) no later than 09/15/2023. (B) Exclusion The term “eligible high hazard potential dam” does not include— (i) a licensed hydroelectric dam under a hydropower project with an authorized installed capacity of greater than 1.5 megawatts; or (ii) a dam built under the authority of the Secretary of Agriculture.” 33 U.S.C. § 467(4)(A) Note: Dams with FAIR condition assessment in the NID (with a population at risk (PAR) of less than 1000) may be eligible for the HHPD program. See Section d. List of Eligible High Hazard Dams Template, below for more details. Dams with a SATISFACTORY or NOT RATED condition assessment in the NID are not eligible for the HHPD program. HHPD Prioritization Tool The FEMA project prioritization tool is an Excel-based tool developed specifically for the HHPD grants. This screening level tool requires input from the NID and data available from other state sources such as inspection reports. The tool assists in the estimation of the likelihood of failure for static, hydrologic, and seismic failure modes based on existing deficiencies and the change in likelihood of failure by removing the deficiencies and bringing the dam in compliance with state standards. The HHPD priority system process requires that dams under consideration for HHPD funding be plotted on a HHPD risk matrix with the likelihood of failure from the FEMA project prioritization tool on the vertical axis and the PAR calculated using the US Army Corps of Engineers Dam Screening Tool (DST) plotted on the horizonal axis of the risk matrix. Comparing the dams based on likelihood of failure and PAR consequences provide a ranking of dams consistent with the intent of the Act. If the SAA chooses to be a pass-through entity, the SAA must contact potential subrecipients to identify potential eligible subrecipients with an eligible dam who express interest in obtaining a grant for a specific planning or design project and are capable of meeting the requirements of the HHPD grant. See Section H.17., Eligible Activities, for information on Eligible Activities. The list or prospective eligible dams will be used to allocate grant funds to the state. See Section H.15., Example Using the Funding Formula, for a sample calculation on how eligible dams is used for state grant allocations. Upon request, the SAA must provide to FEMA substantiating documentation that documents dams submitted are eligible under the HHPD grant. The requested documentation may include, but is not limited to, copies of the regulatory notices, risk assessments, engineering analyses, etc. d. List of Eligible High Hazard Dams Template FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 15 The list of dams must be submitted in table format with NID Data and must include the below column row headers and must be signed by the State Dam Safety Agency or GAR: • Does the state have a state dam safety program? • Dam Name • NID ID • Longitude • Latitude • Hazard Potential • State Approved EAP? (Y/N) • EAP Date • Owner Type • Built by USDA/NRCS? (Y/N) • Licensed by FERC? (Y/N) • NID Condition Assessment* • Fails to Meet Minimum State Dam Safety Standards • Dam has a documented Dam Safety Deficiency? ** • Was Dam Safety Deficiency caused by lack of Routine Operation and Maintenance? • Was Dam Safety Deficiency caused by Deferred Maintenance? • Brief Description of Deficiency • Name of potential Subrecipient that has indicated interest in HHPD and is capable of meeting HHPD requirements*** * FEMA will review the Condition Assessment data reported in the NID to validate a dam’s eligibility on 09/15/2023. Dams that meet the NID criteria for POOR or UNSATISFACTORY condition assessments may be eligible to include on the list of eligible high hazard potential dams. Also dams that meet the NID criteria of FAIR and with a PAR greater than or equal to 1000 may be eligible. Upon request, the SAA must provide to FEMA substantiating documentation that verify dams submitted are eligible under the HHPD grant. The requested documentation may include, but is not limited to, copies of the regulatory notices, risk assessments, engineering analyses, etc. **Dam Safety Deficiency (Source NID): A load capacity limit or other issue that can result in a failure of the dam or appurtenant structure. It is a characteristic or condition that does not meet the applicable minimum regulatory criteria. *** the SAA must contact potential subrecipients to identify potential eligible subrecipients with an eligible dam who express interest in obtaining a grant for a specific planning or design project and are capable of meeting the requirements of the HHPD grant. (Only fill out this field if the potential subrecipient has been contacted or is the SAA.) 5. Cost Share or Match Assistance provided under the HHPD grant is subject to a non-Federal cost-sharing requirement of not less than 35 percent. Federal funding is available for up to 65 percent of the eligible activity costs. The remaining 35 percent of eligible activity costs must be derived from non- federal sources, which may be in-kind. Requirements for cash and third-party in-kind FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 16 contributions can be found in 2 Code of Federal Regulations § 200.306. The non-Federal cost share contribution is not limited to 65 percent. The non-federal cost share contribution is calculated based on the total cost of the proposed activity. The calculation to determine the non-Federal Cost share is: Non-Federal Share = [0.35*(Federal Share)]/(0.65). For example, if the total cost is $400,000 and the non-Federal cost share is 35 percent, then the non-federal contribution is $140,000: 35 percent of $400,000 is $140,000. The federal share cannot exceed $260,000 ($400,000 x 65%). D. Application and Submission Information 1. Key Dates and Times a. Application Start Date: 11/06/2023 at 09:00:00 AM ET b. Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET All applications must be received by the established deadline. FEMA’s Grants Outcomes System (FEMA GO) automatically records proof of timely submission and the system generates an electronic date/time stamp when FEMA GO successfully receives the application. The individual with the Authorized Organization Representative role that submitted the application will also receive the official date/time stamp and a FEMA GO tracking number in an email serving as proof of their timely submission. For additional information on how an applicant will be notified of application receipt, see the subsection titled “Timely Receipt Requirements and Proof of Timely Submission” in Section D of this NOFO. FEMA will not review applications that are received after the deadline or consider these late applications for funding. FEMA may, however, extend the application deadline on request for any applicant who can demonstrate that good cause exists to justify extending the deadline. Good cause for an extension may include technical problems outside of the applicant’s control that prevent submission of the application by the deadline, other exigent or emergency circumstances, or statutory requirements for FEMA to make an award. Applicants experiencing technical problems outside of their control must notify FEMA as soon as possible and before the application deadline. Failure to timely notify FEMA of the issue that prevented the timely filing of the application may preclude consideration of the award. “Timely notification” of FEMA means: prior to the application deadline and within 48 hours after the applicant became aware of the issue. A list of FEMA contacts can be found in Section G of this NOFO, “DHS Awarding Agency Contact Information.” For additional assistance using the FEMA GO System, please contact the FEMA GO Service Desk at 1-877-585-3242 or FEMAgo@fema.dhs.gov. The FEMA GO Service Desk is available Monday through Friday, 9:00 AM – 6:00 PM Eastern Time (ET). For programmatic or grants management questions, please contact your Program Analyst or Grants FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 17 Specialist. FEMA Grants News is a non-emergency comprehensive management and information resource developed by FEMA for grants stakeholders. This channel provides general information on all FEMA grant programs and maintains a comprehensive database containing key personnel contact information at the federal, state, and local levels. When necessary, recipients will be directed to a federal point of contact who can answer specific programmatic questions or concerns. FEMA Grants Information Desk can be reached by e-mail at fema-grants- news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9:00 AM – 5:00 PM ET. c. Anticipated Funding Selection Date: No later than 03/25/2024 d. Anticipated Award Date: No later than 04/08/2024 e. Other Key Dates Event Suggested Deadline for Completion Obtaining Unique Entity Identifier (UEI) number Four weeks before actual submission deadline Obtaining a valid Employer Identification Number (EIN) Four weeks before actual submission deadline Creating an account with login.gov Four weeks before actual submission deadline Registering in SAM or updating SAM registration Four weeks before actual submission deadline Registering Organization in FEMA GO Prior to beginning application Submitting complete application in FEMA GO One week before actual submission deadline 2. Agreeing to Terms and Conditions of the Award By applying, applicants agree to comply with the requirements of this NOFO and the terms and conditions of the award, should they receive an award. 3. Address to Request Application Package Applications are processed through the FEMA GO system. To access the system, go to https://go.fema.gov/. Hard copies of the NOFO can be downloaded at Grants.gov or obtained via email from the Awarding Office points of contact listed in Section G of this NOFO, “DHS Awarding Agency Contact Information” or by TTY (800) 462-7585. 4. Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award Management (SAM), and Submit an Application FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 18 Applying for an award under this program is a multi-step process and requires time to complete. Applicants are encouraged to register early as the registration process can take four weeks or more to complete. Therefore, registration should be done in sufficient time to ensure it does not impact your ability to meet required submission deadlines. Requirements: Obtain a Unique Entity Identifier (UEI) and Register in the System for Award Management (SAM) Each applicant, unless they have a valid exception under 2 CFR 25.110, must: 1) Be registered in Sam.Gov before application submission. 2) Provide a valid Unique Entity Identifier (UEI) in its application. 3) Continue to always maintain an active System for Award Management (SAM) registration with current information during the Federal Award process. " Please review the table above for estimated deadlines to complete each of the steps listed. Failure of an applicant to comply with any of the required steps before the deadline for applying may disqualify that application from funding. To apply for an award under this program, all applicants must: a. Apply for, update, or verify their Unique Entity Identifier (UEI) number and Employer Identification Number (EIN) from the Internal Revenue Service; b. In the application, provide an UEI number; c. Have an account with login.gov; d. Register for, update, or verify their SAM account and ensure the account is active before submitting the application; e. Register in FEMA GO, add the organization to the system, and establish the Authorized Organizational Representative (AOR). The organization’s electronic business point of contact (eBiz POC) from the SAM registration may need to be involved in this step. For step-by-step instructions, see https://www.fema.gov/media- library/assets/documents/181607; f. Submit the complete application in FEMA GO; and g. Continue to maintain an active SAM registration with current information at all times during which it has an active federal award or an application or plan under consideration by a federal awarding agency. As part of this, applicants must also provide information on an applicant’s immediate and highest-level owner and subsidiaries, as well as on all predecessors that have been awarded federal contracts or federal financial assistance within the last three years, if applicable. Applicants are advised that FEMA may not make a federal award until the applicant has complied with all applicable SAM requirements. Therefore, an applicant’s SAM registration must be active not only at the time of application, but also during the application review period and when FEMA is ready to make a federal award. Further, as noted above, an applicant’s or recipient’s SAM registration must remain active for the duration of an active federal award. If an applicant’s SAM registration is expired at the time of application, expires during application review, or expires any other time before award, FEMA may determine FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 19 that the applicant is not qualified to receive a federal award and use that determination as a basis for making a federal award to another applicant. Per 2 C.F.R. § 25.110(c)(2)(iii), if an applicant is experiencing exigent circumstances that prevents it from obtaining an UEI number and completing SAM registration prior to receiving a federal award, the applicant must notify FEMA as soon as possible by contacting FireGrants@fema.dhs.gov and providing the details of the circumstances that prevent completion of these requirements. If FEMA determines that there are exigent circumstances and FEMA has decided to make an award, the applicant will be required to obtain an UEI number, if applicable, and complete SAM registration within 30 days of the federal award date. 5. Electronic Delivery DHS is participating in the Grants.gov initiative to provide the grant community with a single site to find and apply for grant funding opportunities. DHS encourages or requires applicants to submit their applications online through Grants.gov, depending on the funding opportunity. For this funding opportunity, FEMA requires applicants to submit applications through FEMA GO. 6. How to Register to Apply a. General Instructions: Registering and applying for an award under this program is a multi-step process and requires time to complete. Read the instructions below about registering to apply for FEMA funds. Applicants should read the registration instructions carefully and prepare the information requested before beginning the registration process. Reviewing and assembling the required information before beginning the registration process will alleviate last-minute searches for required information. The registration process can take up to four weeks to complete. To ensure an application meets the deadline, applicants are advised to start the required steps well in advance of their submission. Organizations must have a Unique Entity Identifier (UEI) number, Employer Identification Number (EIN), and an active System for Award Management (SAM) registration. b. Obtain a UEI Number: All entities applying for funding, including renewal funding, must have a UEI number. Applicants must enter the UEI number in the applicable data entry field on the SF-424 form. For more detailed instructions for obtaining a UEI number, refer to SAM.gov. c. Obtain Employer Identification Number: In addition to having a UEI number, all entities applying for funding must provide an Employer Identification Number (EIN). The EIN can be obtained from the IRS by visiting https://www.irs.gov/businesses/small-businesses-self-employed/apply-for-an-employer- identification-number-ein-online. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 20 d. Create a login.gov account: Applicants must have a login.gov account in order to register with SAM or update their SAM registration. Applicants can create a login.gov account here: https://secure.login.gov/sign_up/enter_email?request_id=34f19fa8-14a2-438c-8323- a62b99571fd. Applicants only have to create a login.gov account once. For applicants that are existing SAM users, use the same email address for the login.gov account as with SAM.gov so that the two accounts can be linked. For more information on the login.gov requirements for SAM registration, refer to https://www.sam.gov/SAM/pages/public/loginFAQ.jsf. e. Register with SAM: In addition to having a UEI number, all organizations must register with SAM. Failure to register with SAM will prevent your organization from applying through FEMA GO. SAM registration must be renewed annually and must remain active throughout the entire grant life cycle. For more detailed instructions for registering with SAM, refer to https://www.grants.gov/web/grants/applicants/organization-registration/step-2-register-with- sam.html. Note: As a new requirement per 2 C.F.R. § 25.200, applicants must also provide the applicant’s immediate and highest-level owner, subsidiaries, and predecessors that have been awarded federal contracts or federal financial assistance within the past three years, if applicable. I. ADDITIONAL SAM REMINDERS Existing SAM.gov account holders should check their account to make sure it is “ACTIVE.” SAM registration should be completed at the very beginning of the application period and should be renewed annually to avoid being “INACTIVE.” Please allow plenty of time before the grant application submission deadline to obtain a UEI number and then to register in SAM. It may be four weeks or more after an applicant submits the SAM registration before the registration is active in SAM, and then it may be an additional 24 hours before FEMA’s system recognizes the information. It is imperative that the information applicants provide is correct and current. Please ensure that your organization’s name, address, UEI number, and Employer Identification Number, or EIN, are up to date in SAM and that the UEI number used in SAM is the same one used to apply for all other FEMA awards. Payment under any FEMA award is contingent on the recipient’s having a current SAM registration. II. HELP WITH SAM FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 21 The SAM quick start guide for new recipient registration and SAM video tutorial for new applicants are tools created by the General Services Administration (GSA) to assist those registering with SAM. If applicants have questions or concerns about a SAM registration, please contact the Federal Support Desk at https://www.fsd.gov/fsd-gov/home.do or call toll free (866) 606-8220 Monday - Friday 8 a.m. to 8 p.m. ET. f. Register in FEMA GO, Add the Organization to the System, and Establish the AOR: Applicants must register in FEMA GO and add their organization to the system. The organization’s electronic business point of contact (eBiz POC) from the SAM registration may need to be involved in this step. For step-by-step instructions, see FEMA GO Startup Guide. Note: FEMA GO will support only the most recent major release of the following browsers: • Google Chrome; • Internet Explorer; • Mozilla Firefox; • Apple Safari; and • Microsoft Edge. Users who attempt to use tablet type devices or other browsers may encounter issues with using FEMA GO. 7. Submitting the Application Applicants will be prompted to submit the standard application information and any program-specific information required as described in Section D.10 of this NOFO, “Content and Form of Application Submission.” The Standard Forms (SF) may be accessed in the Forms tab under the SF-424 family on Grants.gov. Applicants should review these forms before applying to ensure they have all the information required. After submitting the application, FEMA GO will provide either an error message or a successfully received transmission in the form of an email sent to the Authorized Organization Representative that submitted the application. Applicants using slow internet connections, such as dial-up connections, should be aware that transmission can take some time before FEMA GO receives your application. For additional application submission requirements, including program-specific requirements, please refer to the subsection titled “Content and Form of Application Submission” under Section D of this NOFO. 8. Timely Receipt Requirements and Proof of Timely Submission All applications must be completed in FEMA GO by the application deadline. FEMA GO automatically records proof of timely submission and the system generates an electronic date/time stamp when FEMA GO successfully receives the application. The individual with FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 22 the Authorized Organization Representative (AOR) role that submitted the application will also receive the official date/time stamp and a FEMA GO tracking number in an email serving as proof of their timely submission on the date and time that FEMA GO received the application. Applicants who experience system-related issues will be addressed until 3:00 PM ET on the date applications are due. No new system-related issues will be addressed after this deadline. Applications not received by the application submission deadline will not be accepted. 9. Content and Form of Application Submission a. Standard Required Application Forms and Information The following forms or information are required to be submitted via FEMA GO. The Standard Forms (SF) are also available at https://www.grants.gov/web/grants/forms/sf-424- family.html. ￿ SF-424, Application for Federal Assistance ￿ Grants.gov Lobbying Form, Certification Regarding Lobbying ￿ SF-424A, Budget Information (Non-Construction) • For construction under an award, submit SF-424C, Budget Information (Construction), in addition to or instead of SF-424A ￿ SF-424B, Standard Assurances (Non-Construction) • For construction under an award, submit SF-424D, Standard Assurances (Construction), in addition to or instead of SF-424B ￿ SF-LLL, Disclosure of Lobbying Activities ￿ Indirect Cost Agreement or Proposal if the budget includes indirect costs and the applicant is required to have an indirect cost rate agreement or proposal. If the applicant does not have or is not required to have an indirect cost rate agreement or proposal, please see Section D.13 of this NOFO, “Funding Restrictions and Allowable Costs,” for further information regarding allowability of indirect costs and whether alternatives to an indirect cost rate agreement or proposal might be available, or contact the relevant FEMA staff identified in Section G of this NOFO, “DHS Awarding Agency Contact Information” for further instructions. Generally, applicants have to submit either the non-construction forms (i.e., SF-424A and SF-424B) or construction forms (i.e., SF-424C and SF-424D), meaning that applicants that only have construction work and do not have any non-construction work need only submit the construction forms (i.e., SF-424C and SF-424D) and not the non-construction forms (i.e., SF-424A and SF-424B), and vice versa. However, applicants who have both construction and non-construction work under this program need to submit both the construction and non- construction forms. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 23 b. Program-Specific Required Forms and Information The following program-specific forms or information are required to be submitted in National Dam Safety Rehabilitation of High Hazard Potential Dams grant: Contact your NDSP Program Officer for templates to submit Program-Specific Information. The following program-specific forms or information are required to be submitted in: The SAA must include the following five documents in the initial application package—each document must be labeled and numbered. At the top of each document provide the following: • State/Agency Name • FY24 FALL HHPD • Name and contact information (completing documents) • Date The following program-specific forms or information are required to be submitted in FEMA GO: 1. List of eligible high hazard potential dams, including National Inventory of Dams (NID) ID Identifiers, in their state with the application. The SAA or GAR should sign a statement that the list of eligible high hazard potential dams has been reviewed and approved. See Section C.4.c., List of Eligible High Hazard Potential Dams, for eligibility requirements and Section C.4.d., List of Eligible High Hazard Potential Dams Template, for an example table template for submittal. 2. Proposed Budget and HHPD proposed projects/activities: Indicate and describe proposed activities: (1) project scoping and engineering design, and or (2) construction (clearly indicate if project includes repair, rehabilitation, or removal). Include a brief project narrative on how the funds will advance HHPD priorities and meet performance goals and include: a. Proposed Budget b. Percent of cost share: Submit the cost share and a summary of in-kind activities. See Section C.5., Cost Share or Match, for requirements. 3. Statement of assurances signed by authorized state official a. Statement and date of FEMA approval of state HMP which includes all-dam risk (insert ref/policy) b. Statement the applicant is able to comply with regulations associated with receipt of federal financial contributions from FEMA. c. If Pass-through Entity: Assurance statement that subrecipients will meet all criteria listed in Section C.3., Subrecipient Eligibility Criteria. d. Assurance statement that the 35 percent cost share requirement can be met. See Section C.5., Cost Share or Match, for requirements. 4. State Administrative Plan. At a minimum, the State Administrative Plan must include the items listed below: FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 24 a. Designation of the SAA responsible for program administration. b. Identification of the State Official responsible for financial and program matters related to the High Hazard Potential Dam Rehabilitation Grant Program c. Timely submission of HHPD quarterly performance progress reports on approved projects. d. Determination of staffing requirements and sources of staff necessary for administration of the program. e. If applicable, the establishment of procedures as a Pass-through Entity: 1. Identify, select, and notify potential subrecipients of the availability of the program. 2. Ensure that potential subrecipients are provided information on the application process, program eligibility, including the requirement for an approved mitigation plan that includes all dam risks for the jurisdiction where the dam is located, and key deadlines. 3. Determine subrecipient eligibility, including the requirement for an approved mitigation plan for the jurisdiction where the dam is located. 4. Submit revisions or amendments for FEMA review and approval. See Section F.2, Pass-Through Requirements. 5. Conduct environmental and floodplain management reviews. 6. Establish priorities for selection of projects. 7. Process requests for advances of funds and reimbursement. 8. Monitor and evaluate the progress and completion of the selected projects. 9. Review and approve cost overruns. 10. Process appeals. 11. Provide technical assistance as required to subrecipient(s) and/or jurisdiction where the dam is located including coordination with State Hazard Mitigation Officer regarding the eligibility requirement to have an approved mitigation plan that includes all dam risks and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). For more information on the Mitigation Plan Requirements, see Section E.1., Application Evaluation Criteria. 12. Comply with the administrative and audit requirements of 2 Code of Federal Regulations Part 200. 10. Other Submission Requirements Fair Wages and Labor Standards: Regarding payment of laborers and mechanics employed by contractors or subcontractors in the performance of construction work financed with the assistance of any contribution of Federal funds. Section 5196(j)(9) of the US Code of Laws Title 42. For a grant of an amount greater than $1,000,000, an eligible subrecipient that receives the grant shall require that each contract and subcontract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping, and related services entered into using FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 25 funds from the grant be awarded in the same manner as a contract for architectural and engineering services is awarded under— (A) chapter 11 of title 40; or (B) an equivalent qualifications-based requirement prescribed by the relevant State. 11. Intergovernmental Review An intergovernmental review may be required. Applicants must contact their state’s Single Point of Contact (SPOC) to comply with the state’s process under Executive Order 12372 (See https://www.archives.gov/federal-register/codification/executive-order/12372.html; www.whitehouse.gov/wp-content/uploads/2020/04/SPOC-4-13-20.pdf . 12. Funding Restrictions and Allowable Costs All costs charged to awards covered by this NOFO must comply with the Uniform Administrative Requirements, Cost Principles, and Audit Requirements at 2 C.F.R. Part 200, unless otherwise indicated in the NOFO, or the terms and conditions of the award. This includes, among other requirements, that costs must be incurred, and products and services must be delivered, within the period of performance of the award. See 2 C.F.R. § 200.403(h) (referring to budget periods, which for FEMA awards is the same as the period of performance). In general, the Cost Principles establish standards for the allowability of costs, provide detailed guidance on the cost accounting treatment of costs as direct or administrative costs, and set forth allowability principles for selected items of cost. More specifically, except as otherwise stated in this NOFO, the terms and condition of an award, or other program materials, costs charged to awards covered by this NOFO must be consistent with the Cost Principles for Federal Awards located at 2 C.F.R. Part 200, Subpart E. In order to be allowable, all costs charged to a FEMA award or applied to the cost share must be reasonable in nature and amount and allocable to the particular FEMA award. Additionally, all costs charged to awards must comply with the grant program’s applicable statutes, policies, requirements in this NOFO as well as with the terms and conditions of the award. If FEMA staff identify costs that are inconsistent with any of these requirements, these costs may be disallowed, and FEMA may recover funds as appropriate, consistent with applicable laws, regulations, and policies. As part of those requirements, grant recipients and subrecipients may only use federal funds or funds applied to a cost share for the purposes set forth in this NOFO and the terms and conditions of the award, and those costs must be consistent with the statutory authority for the award. Grant funds may not be used for matching funds for other federal grants/cooperative agreements, lobbying, or intervention in federal regulatory or adjudicatory proceedings. In addition, federal funds may not be used to sue the federal government or any other government entity. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 26 HHPD recipients may only fund activities and projects that are included and approved in the FY 2024 HHPD Work Plan and Budget. See Section H.17., Eligible Activities, for a description of eligible activities. See Section D.10., Content and Form of Application Submission, for Work Plan requirements. The maximum amount of funding any Subrecipient can receive under HHPD is statutorily limited. The maximum subrecipient funding cannot exceed the lesser of 12.5 percent of the total amount of funds made available. For the FY 2024 program, $185,120,000.00 is allocated to the HHPD program; therefore, no subrecipient may receive an award for more than $7,500,000.00. See Section H.15., Examples Using Funding Formula. a. Requirements Related to Contractor and Subcontractor Wages Per 33 U.S.C. § 467f-2(d)(2)(E), recipients and subrecipients are required to comply with the requirements of 42 U.S.C. § 5196(j)(9). All laborers and mechanics employed by contractors or subcontractors in the performance of construction work financed with the assistance of any contribution of Federal funds made by the Administrator under this subsection shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with sections 3141–3144, 3146, and 3147 of title 40, and every such employee shall receive compensation at a rate not less than one and ½ times the basic rate of pay of the employee for all hours worked in any workweek in excess of eight hours in any workday or 40 hours in the workweek, as the case may be. The Administrator shall make no contribution of Federal funds without first obtaining adequate assurance that these labor standards will be maintained upon the construction work. The Secretary of Labor shall have, with respect to the labor standards specified in this subsection, the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (5 U.S.C. App.) and section 3145 of title 40. b. Requirements Related to Contract and Subcontract Services Per 33 U.S.C. § 467f-2(i), a contract awarded shall not be considered to confer a proprietary interest upon the United States. As a condition on the receipt of a grant under this section of an amount greater than $1,000,000, recipients and subrecipients shall require that each contract and subcontract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping, and related services entered into using funds from the grant be awarded in the same manner as a contract for architectural and engineering services is awarded under 40 U.S. Code Chapter 11 or an equivalent qualifications-based requirement prescribed by the recipient state. c. Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services Recipients and subrecipients of FEMA federal financial assistance are subject to the prohibitions described in section 889 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (FY 2019 NDAA), Pub. L. No. 115-232 (2018) and 2 C.F.R. §§ 200.216, 200.327, 200.471, and Appendix II to 2 C.F.R. Part 200. Beginning August 13, FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 27 2020, the statute – as it applies to FEMA recipients, subrecipients, and their contractors and subcontractors – prohibits obligating or expending federal award funds on certain telecommunications and video surveillance products and contracting with certain entities for national security reasons. Guidance is available at FEMA Policy #405-143-1 - Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services Additional guidance is available at Contract Provisions Guide: Navigating Appendix II to Part 200 - Contract Provisions for Non-Federal Entity Contracts Under Federal Awards (fema.gov). Effective August 13, 2020, FEMA recipients and subrecipients may not use any FEMA funds under open or new awards to: • Procure or obtain any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; • Enter into, extend, or renew a contract to procure or obtain any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; or • Enter into, extend, or renew contracts with entities that use covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. I. D EFINITIONS Per section 889(f)(2)-(3) of the FY 2019 NDAA and 2 C.F.R. § 200.216, covered telecommunications equipment or services means: i. Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation, (or any subsidiary or affiliate of such entities); ii. For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities); iii. Telecommunications or video surveillance services provided by such entities or using such equipment; or iv. Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the People’s Republic of China. Examples of the types of products covered by this prohibition include phones, internet, video surveillance, and cloud servers when produced, provided, or used by FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 28 the entities listed in the definition of “covered telecommunications equipment or services.” See 2 C.F.R. § 200.471. d. Enhancing Critical Infrastructure Cybersecurity. When eligible subapplications include an information technology or operational technology component as part of a project under this program, FEMA will allow activities that enable greater resilience through cybersecurity as eligible costs when those activities are performed in accordance with the cybersecurity performance goals for critical infrastructure and control systems directed by the National Security Presidential Memorandum on Improving Cybersecurity for Critical Infrastructure Control Systems, found at https://www.cisa.gov/control-systems-goals-and-objectives. Subapplicants should address cybersecurity in their planning, design, and project oversight for awards that include a technology nexus that may pose a cyber risk that would affect the reliability or operability of project. e. Pre-Award Costs Pre-award costs are not allowed. f. Management and Administration (M&A) Costs Management and administration (M&A) activities are those directly relating to the management and administration of HHPD funds, such as financial management and monitoring. M&A costs are not operational costs. They are the necessary costs incurred in direct support of the grant or as a consequence of the grant and should be allocated across the entire lifecycle of the grant. A maximum of up to 10 percent of HHPD funds awarded may be retained by the state, and any funds retained are to be used solely for M&A purposes associated with the HHPD award. Subrecipients may also retain a maximum of up to 5 percent of the funding passed through by the state solely for M&A purposes associated with the HHPD award. Applicant requests for management costs must be included in the State Administrative Plan. Subrecipient management cost activities must be added to the scope of work section and reflected in the cost estimate section of subgrant applications. Applicants and subrecipients who do not receive awards/subawards will not receive reimbursement for management costs. g. Indirect Facilities & Administrative (F&A) Costs Indirect costs are allowable under this program as described in 2 Code of Federal Regulations Part 200, including 2 Code of Federal Regulations § 200.414. Applicants with a current negotiated indirect cost rate agreement that desire to charge indirect costs to an award must provide a copy of their negotiated indirect cost rate agreement at the time of application. Not all applicants are required to have a current negotiated indirect cost rate agreement. Applicants that are not required by 2 Code of Federal Regulations Part 200 to have a negotiated indirect cost rate agreement but are required by 2 Code of Federal Regulations. Part 200 to develop an indirect cost rate proposal must provide a copy of their proposal at the time of application. Applicants who do not have a current negotiated indirect cost rate agreement (including a provisional rate) and wish to charge the de minimis rate must reach out to the regional Grants Program Manager for further instructions. Applicants who wish to FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 29 use a cost allocation plan in lieu of an indirect cost rate must also reach out to the regional grants program manager for further instructions. E. Application Review Information 1. Application Evaluation Criteria In addition to the eligibility requirements stated in Section C., Eligibility Information, the following programmatic criteria must be met and will be evaluated during the application review. a. Programmatic Criteria for Mitigation Plan Requirement Applicant During the application review period for completeness and eligibility, FEMA will validate if the Applicant has an approved state mitigation plan that includes all dam risks. See Section H.19., Definitions, for the definition of All Dam Risk. If the Applicant has an approved state mitigation plan that does not include all dam risks, the program will inform the Applicant of the determination and the Applicant may submit a request for an extension to the mitigation plan requirement. Applicants may coordinate with FEMA for a review of the approved state mitigation plan to assess for all dam risks in advance of the application deadline. All supplemental attachments must be submitted via FEMA GO. See Section H.13., Mitigation Plan Requirement Extension Requests. Applicant’s state hazard mitigation plan will be assessed against 44 Code of Federal Regulations Part 201, Mitigation Planning, and the requirements specific to assessing all dam risks set forth in the State Mitigation Planning Policy Guide (FEMA, April 2022). The requirements in this NOFO supersede requirements in the Rehabilitation of High Hazard Potential Dams Grant Program Guidance (FEMA, June 2020) and the FEMA Policy 104- 008-7, to determine if the plan complies with the requirement to address all dam risks. For additional information on all other state mitigation plan requirements and FEMA procedures for review and approval of state mitigation plans, see the State Mitigation Planning Policy Guide (FEMA, April 2022). Subrecipients Subrecipients must demonstrate that the tribal or local government with jurisdiction over the area in which the dam is located has in place at the time the SAA submits the SOW package to FEMA, ands the time FEMA approves the SOW package, an approved hazard mitigation plan that includes all dam risks. See Section H.19., Definitions, for the definition of All Dam Risk. The hazard mitigation plan must comply with the Disaster Mitigation Act of 2000 (Public. L. 106–390; 114 Stat. 1552). Dams owned by nonprofit organizations that are subrecipients must be located in a local jurisdiction with an approved hazard mitigation plan that includes all dam risks and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). FEMA will determine if the mitigation plan addresses all dam risks in accordance with the requirements specific to assessing all dam risks set forth in the Local Mitigation Planning Policy Guide (FEMA, April 2022). These requirements supersede the Rehabilitation of High Hazard FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 30 Potential Dams Grant Program Guidance (FEMA, June 2020) and the FEMA Policy 104- 008-7, to determine if the plan complies with the requirement to address all dam risks. For additional information on all other local mitigation plan requirements and FEMA procedures for review and approval of local mitigation plans, see FEMA’s Local Mitigation Plan Review Guide (Local Guide) (2022) / Guía de Revisión del Plan Local de Mitigación (2022) or subsequent update. If the dam is located on land under jurisdiction of a Federally recognized tribal government, the tribal mitigation plan must address all dam risks. FEMA will validate whether each of the following elements are included in the tribal plan: a. Does the plan describe the incorporation of existing plans, studies, reports, and technical information for high hazard potential dams? b. Does the plan address high hazard potential dams in the risk assessment? c. Does the plan include mitigation goals to reduce long-term vulnerabilities from high hazard potential dams? d. Does the plan include actions that address high hazard potential dams, and prioritize mitigation actions to reduce vulnerabilities from high hazard potential dams? For additional information on tribal mitigation plan requirements, reference the Tribal Mitigation Plan Review Guide (December 2017). If an HHPD subrecipient cannot demonstrate that the local or tribal government with jurisdiction over the area in which the dam is located has in place a hazard mitigation plan that includes all dam risks; and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552); then the subrecipient may request an extension to meet this requirement, and may need to coordinate with the jurisdiction where the dam is located to update the mitigation plan to include all dam risks within twelve (12) months. For more information see Section H.13., Mitigation Plan Requirement Extension Requests. b. Financial Integrity Criteria Prior to making a federal award, FEMA is required by 31 U.S.C. § 3354, as enacted by the Payment Integrity Information Act of 2019, Pub. L. No. 116-117 (2020); 41 U.S.C. § 2313; and 2 C.F.R. § 200.206 to review information available through any Office of Management and Budget (OMB)-designated repositories of governmentwide eligibility qualification or financial integrity information, including whether the applicant is suspended or debarred. FEMA may also pose additional questions to the applicant to aid in conducting the pre-award risk review. Therefore, application evaluation criteria may include the following risk-based considerations of the applicant: i. Financial stability. ii. Quality of management systems and ability to meet management standards. iii. History of performance in managing federal award. iv. Reports and findings from audits. v. Ability to effectively implement statutory, regulatory, or other requirements. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 31 c. Supplemental Financial Integrity Criteria and Review Prior to making a federal award where the anticipated total federal share will be greater than the simplified acquisition threshold, currently $250,000: i. FEMA is required to review and consider any information about the applicant, including information on the applicant’s immediate and highest-level owner, subsidiaries, and predecessors, if applicable, that is in the designated integrity and performance system accessible through the System for Award Management (SAM), which is currently the Federal Awardee Performance and Integrity Information System (FAPIIS). ii. An applicant, at its option, may review information in FAPIIS and comment on any information about itself that a federal awarding agency previously entered. iii. FEMA will consider any comments by the applicant, in addition to the other information in FAPIIS, in making a judgment about the applicant’s integrity, business ethics, and record of performance under federal awards when completing the review of risk posed by applicants as described in 2 C.F.R. § 200.206. 2. Review and Selection Process The review and selection process will be completed in two parts: Part 1 FEMA reviews applications for completeness and eligibility as well as the brief scoping narratives for potential FY24 projects. After the Part 1 review is complete, FEMA will notify states of funding amounts via the FEMA GO system. During Part 1, SAAs will submit applications into Grants.gov and FEMA Go, and FEMA Headquarters will review the applications for completeness and eligibility. SAAs are to include clearly defined State objectives, a proposal narrative, and the required critical data to support proposal. Applicants will be evaluated and selected for funding based on the following: 1. The Applicant has the authority and demonstrates the capability necessary to successfully fulfill the requirements of the HHPD. 2. The dams included on the Applicant’s list of eligible high hazard potential dams meet eligibility criteria. 3. The Applicant demonstrates how HHPD funds will advance the HHPD priorities and performance goals and provides brief scoping narratives for potential FY24 projects. 4. The State Administrative Plan must clearly describe the SAA’s timelines and milestones for implementing the HHPD grant. The State Administrative Plan must describe the process for selecting subrecipients. The State Administrative Plan must also describe methodology FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 32 and data used to measure progress toward achieving the performance outcomes of the HHPD grant. 5. FEMA will validate if the Applicant has an approved state mitigation plan that includes all dam risks. FEMA may request additional information from the Applicant for clarification and better understanding of the proposed grant activities during this review period. Part 2 SAA accepts the funding award and develops and submits a Scope of Work (SOW) package to include a narrative of how and why the projects were selected for funding, detailed quarterly milestone workplan, EHP checklist, and budget narrative (Refer to FEMA Program Officer for checklist for SOW package). The SOW package must be submitted to FEMA for review during the Part 2 submission period. FEMA will review the subrecipient’s local hazard mitigation plan for eligibility. See Section D.10.b, Program-Specific Required Forms and Information and Section F.2., Pass-Through Requirements, for requirements. See Section E.1.a, Programmatic Criteria for Mitigation Plan Requirement, for more details on specific application evaluation criteria. F. Federal Award Administration Information 1. Notice of Award Before accepting the award, the AOR and recipient should carefully read the award package. The award package includes instructions on administering the grant award and the terms and conditions associated with responsibilities under federal awards. Recipients must accept all conditions in this NOFO as well as any specific terms and conditions in the Notice of Award to receive an award under this program. FEMA will provide the federal award package to the applicant electronically via FEMA GO. Award packages include an Award Letter, Summary Award Memo, Agreement Articles, and Obligating Document. An email notification of the award package will be sent through FEMA’s grant application system to the Authorized Organization Representative (AOR) that submitted the application. Recipients must accept their awards no later than 60 days from the award date. The recipient shall notify FEMA of its intent to accept and proceed with work under the award through the FEMA GO system. Funds will remain on hold until the recipient accepts the award through the FEMA GO system and all other conditions of the award have been satisfied or until the award is otherwise rescinded. Failure to accept a grant award within the specified timeframe may result in a loss of funds. 2. Pass-Through Requirements All pass-through entities must comply with 2 Code of Federal Regulations 200.332 Requirements for pass-through entities. Awards made to the SAA for HHPD carry additional FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 33 pass-through requirements. Pass-through is defined as an obligation on the part of the SAA to make funds available to eligible subrecipients. Four requirements must be met to pass- through grant funds: i. The SAA must submit a SOW package to FEMA for approval that describes the budget and project scope for each subrecipient in accordance with 2 Code of Federal Regulations § 200.308. ii. The SAA must make a firm written commitment to passing through grant funds to subrecipients; iii. The SAA’s commitment must be unconditional (i.e., no contingencies for the availability of SAA funds); iv. There must be documentary evidence (i.e., award document, terms, and conditions) of the commitment; and v. The award terms must be communicated to the subrecipient, including the requirement for an approved local or tribal mitigation plan (that meet the requirements set forth at 44 Code of Federal Regulations. Part 201 Mitigation Planning) that addresses all dam risks for the jurisdiction where the dam is located. Timing and Amount The SAA must pass-through the HHPD subaward to eligible subrecipients within 90 calendar days of receipt of the funds. “Receipt of the funds” occurs when the FEMA GO system releases the financial hold of the award, following FEMA approval of the SOW package. SAAs are sent notification of the release of financial hold of the HHPD award funds via the FEMA GO system. 3. Administrative and National Policy Requirements In addition to the requirements of in this section and in this NOFO, FEMA may place specific terms and conditions on individual awards in accordance with 2 C.F.R. Part 200. a. DHS Standard Terms and Conditions All successful applicants for DHS grant and cooperative agreements are required to comply with DHS Standard Terms and Conditions, which are available online at: DHS Standard Terms and Conditions. The applicable DHS Standard Terms and Conditions will be those in effect at the time the award was made. What terms and conditions will apply for the award will be clearly stated in the award package at the time of award. b. Ensuring the Protection of Civil Rights As the Nation works towards achieving the National Preparedness Goal, it is important to continue to protect the civil rights of individuals. Recipients and subrecipients must carry out their programs and activities, including those related to the building, sustainment, and FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 34 delivery of core capabilities, in a manner that respects and ensures the protection of civil rights for protected populations. Federal civil rights statutes, such as Section 504 of the Rehabilitation Act of 1973 and Title VI of the Civil Rights Act of 1964, along with DHS and FEMA regulations, prohibit discrimination on the basis of race, color, national origin, sex, religion, age, disability, limited English proficiency, or economic status in connection with programs and activities receiving federal financial assistance from FEMA. The DHS Standard Terms and Conditions include a fuller list of the civil rights provisions that apply to recipients. These terms and conditions can be found in the DHS Standard Terms and Conditions. Additional information on civil rights provisions is available at https://www.fema.gov/about/offices/equal-rights/civil-rights. Monitoring and oversight requirements in connection with recipient compliance with federal civil rights laws are also authorized pursuant to 44 C.F.R. Part 7. In accordance with civil rights laws and regulations, recipients and subrecipients must ensure the consistent and systematic fair, just, and impartial treatment of all individuals, including individuals who belong to underserved communities that have been denied such treatment. c. Environmental Planning and Historic Preservation (EHP) Compliance As a federal agency, FEMA is required to consider the effects of its actions on the environment and historic properties to ensure that all activities and programs funded by FEMA, including grant-funded projects, comply with federal EHP laws, Executive Orders, regulations, and policies, as applicable. All FEMA actions, including grant-funded actions, must comply with National Flood Insurance Program criteria or any more restrictive federal, state, or local floodplain management standards or building code (44 CFR § 9.11(d)(6)). All FEMA-funded non-critical actions in 1% annual chance floodplains (also known as 100- year floodplains) that involve structure elevation, mitigation reconstruction, dry floodproofing, new construction, repair of substantial damage or substantial improvement of structures must be elevated, at a minimum, to the lower of: • Two feet above the 1% annual chance flood elevation (also known as the base flood elevation), in accordance with the Federal Flood Risk Management Standard (FFRMS) “Freeboard Value Approach” (FVA); or • The 0.2% annual chance flood elevation. Where 0.2% annual chance flood elevations are not available, such actions must be elevated to at least two feet above the 1% annual chance flood elevation. All FEMA-funded critical actions in 1% annual chance floodplains or 0.2% annual chance floodplains (also known as 500-year floodplains) that involve structure elevation, mitigation reconstruction, dry floodproofing, new construction, repair of substantial damage or substantial improvement of structures must be elevated, at a minimum, to the higher of: FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 35 • Three feet above the 1% annual chance flood elevation; or • The 0.2% annual chance flood elevation. Where 0.2% annual chance flood elevations are not available, such actions must be elevated to at least three feet above the 1% annual chance flood elevation. See Executive Order 11988, Floodplain Management, as amended by Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input. Recipients and subrecipients proposing projects that have the potential to impact the environment, including, but not limited to, the construction of communication towers, modification or renovation of existing buildings, structures, and facilities, or new construction including replacement of facilities, must participate in the FEMA EHP review process. The EHP review process involves the submission of a detailed project description along with any supporting documentation requested by FEMA in order to determine whether the proposed project has the potential to impact environmental resources or historic properties. In some cases, FEMA is also required to consult with other regulatory agencies and the public in order to complete the review process. Federal law requires EHP review to be completed before federal funds are released to carry out proposed projects. FEMA may not be able to fund projects that are not incompliance with applicable EHP laws, Executive Orders, regulations, and policies. DHS and FEMA EHP policy is found in directives and instructions available on the FEMA.gov EHP page, the FEMA website page that includes documents regarding EHP responsibilities and program requirements, including implementation of the National Environmental Policy Act and other EHP regulations and Executive Orders. Individual FEMA programs have separate procedures to conduct and document EHP review. Guidance for individual grant programs is available from applicable program offices. d. Good Jobs The Good Jobs Initiative is a Department of Labor-led initiative that provides critical information to workers, employers, and government agencies as they work to improve job quality and create access to good jobs free from discrimination and harassment for all working people. During the implementation of a hazard mitigation project, applicants are encouraged to leverage the Good Jobs Initiative for information and resources on these topics. To learn more about the Good Jobs Initiative visit https://www.dol.gov/general/good- jobs. 4. Reporting Recipients are required to submit various financial and programmatic reports as a condition of award acceptance. Future awards and funds drawdown may be withheld if these reports are delinquent. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 36 a. Financial Reporting Requirements I. F EDERAL FINANCIAL REPORT (FFR) Recipients must report obligations and expenditures through the FFR form (SF-425) to FEMA. Recipients may review the Federal Financial Reporting Form (FFR) (SF-425) at https://www.grants.gov/web/grants/forms/post-award-reporting-forms.html#sortby=1 Recipients must file the FFR electronically using FEMA GO. II. FFR REPORTING PERIODS AND DUE DATES An FFR must be submitted quarterly throughout the POP, including partial calendar quarters, as well as in periods where no grant award activity occurs. The final FFR is due within 120 calendar days after the end of the POP. Future awards and fund drawdowns may be withheld if these reports are delinquent, demonstrate lack of progress, or are insufficient in detail. Except for the final FFR due at 120 days after the end of the POP for purposes of closeout, the following reporting periods and due dates apply for the FFR: Reporting Period Report Due Date October 1 – December 31 January 30 January 1 – March 31 April 30 April 1 – June 30 July 30 July 1 – September 30 October 30 b. Programmatic Performance Reporting Requirements I. PERFORMANCE PROGRESS REPORT (PPR) Grant recipients are responsible for providing performance reports on a quarterly basis. Performance progress reports should be submitted as either a word document or a pdf file. Performance progress reports are due within 30 days after the end of each reporting period, must be submitted via FEMA GO, and must include at a minimum the following: The recipient must use FEMA’s template to submit a quarterly performance progress report (PPR) for each award. See Appendix B, Performance Progress Report (PRR). Performance reports include: 1. Reporting period, date of report, and recipient point of contact (POC) name and contact information. 2. SF-PPR must be used and submitted via FEMA GO FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 37 3. Project identification information, including FEMA project number, subrecipient, and project type using standard FEMA GO. 4. Significant activities and developments that have occurred or have shown progress during the quarter, including a comparison of actual accomplishments to the work schedule objectives established in the subaward. 5. Percent completion and whether completion of work is on schedule; a discussion of any problems, delays, or adverse conditions that will impair the ability to meet the timelines stated in the subaward; and anticipated completion date. 6. Status of costs, including whether the costs are (1) unchanged, (2) overrun, or (3) underrun. If there is a change in cost status, the report should include a narrative describing the change. Also, include amount dispersed to subrecipient by activity. 7. A statement of whether a request to extend the award POP is anticipated. 8. Incremental funding amounts (SFM) and progress completed. 9. Additional information as required by FEMA to assess the progress of an award. The following reporting periods and due dates apply: Reporting Period Report Due Date August 1 – September 30 October 30 (First Report) October 1 – December 31 January 30 January 1 – March 31 April 30 April 1 – June 30 July 30 July 1 – September 30 October 30 c. Closeout Reporting Requirements I. CLOSEOUT REPORTING Within 120 calendar days after the end of the period of performance for the prime award or after an amendment has been issued to close out an award before the original POP ends, recipients must liquidate all financial obligations and must submit the following: i. The final request for payment, if applicable. ii. The final FFR (SF-425). iii. The final progress report detailing all accomplishments, including a narrative summary of the impact of those accomplishments throughout the period of performance. iv. Documentation regarding appeals or dispute settlement v. Other documents required by this funding opportunity, terms and conditions of the award, or other FEMA guidance. These include, but are not limited to: • Records for real property and equipment acquired with federal funds must be retained for three years after final disposition of the property. See 2 Code of Federal Regulations § 200.334(c). • If any litigation, claim, or audit is started before the expiration of the three-year period, the records must be retained until all litigation, claims, or audit findings involving the records have been resolved and final action taken. See 2 Code of Federal Regulations § 200.334(a). FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 38 • The record retention period will be extended if the recipient is notified in writing of the extension by FEMA, the cognizant or oversight agency for audit, or the cognizant agency for indirect costs. See 2 Code of Federal Regulations § 200.334(b). • Where FEMA requires recipients to report program income after the period of performance ends, the program income record retention period begins at the end of the recipient’s fiscal year in which program income is earned. See 2 Code of Federal Regulations § 200.334(e). • For indirect cost rate proposals, cost allocation plans, or other rate computations records, the start of the record retention period depends on whether the indirect cost rate documents were submitted for negotiation. If the indirect cost rate documents were submitted for negotiation, the record retention period begins from the date those documents were submitted for negotiation. If indirect cost rate documents were not submitted for negotiation, the record retention period begins at the end of the recipient’s fiscal year or other accounting period covered by that indirect cost rate. See 2 Code of Federal Regulations § 200.334(f). In addition, pass-through entities are responsible for closing out their subawards as described in 2 C.F.R. § 200.344; subrecipients are still required to submit closeout materials within 90 calendar days of the period of performance end date. When a subrecipient completes all closeout requirements, pass-through entities must promptly complete all closeout actions for subawards in time for the recipient to submit all necessary documentation and information to FEMA during the closeout of the prime award. After the prime award closeout reports have been reviewed and approved by FEMA, a closeout notice will be completed to close out the grant. The notice will indicate the period of performance as closed, list any remaining funds that will be de-obligated, and address the requirement of maintaining the grant records for at least three years from the date of the final FFR. The record retention period may be longer, such as due to an audit or litigation, for equipment or real property used beyond the period of performance, or due to other circumstances outlined in 2 C.F.R. § 200.334. The recipient is responsible for refunding to FEMA any balances of unobligated cash that FEMA paid that are not authorized to be retained per 2 C.F.R. § 200.344(d). II. A DMINISTRATIVE CLOSEOUT Administrative closeout is a mechanism for FEMA to unilaterally move forward with closeout of an award using available award information in lieu of final reports from the recipient per 2 C.F.R. § 200.344(h)-(i). It is a last resort available to FEMA, and if FEMA needs to administratively close an award, this may negatively impact a recipient’s ability to obtain future funding. This mechanism can also require FEMA to make cash or cost adjustments and ineligible cost determinations based on the information it has, which may result in identifying a debt owed to FEMA by the recipient. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 39 When a recipient is not responsive to FEMA’s reasonable efforts to collect required reports needed to complete the standard closeout process, FEMA is required under 2 C.F.R. § 200.344(h) to start the administrative closeout process within the regulatory timeframe. FEMA will make at least three written attempts to collect required reports before initiating administrative closeout. If the recipient does not submit all required reports in accordance with 2 C.F.R. § 200.344, this NOFO, and the terms and conditions of the award, FEMA must proceed to administratively close the award with the information available within one year of the period of performance end date. Additionally, if the recipient does not submit all required reports within one year of the period of performance end date, per 2 C.F.R. § 200.344(i), FEMA must report in FAPIIS the recipient’s material failure to comply with the terms and conditions of the award. If FEMA administratively closes an award where no final FFR has been submitted, FEMA uses that administrative closeout date in lieu of the final FFR submission date as the start of the record retention period under 2 C.F.R. § 200.334. In addition, if an award is administratively closed, FEMA may decide to impose remedies for noncompliance per 2 C.F.R. § 200.339, consider this information in reviewing future award applications, or apply special conditions to existing or future awards. d. Additional Reporting Requirements I. D ISCLOSING INFORMATION PER 2 C.F.R. § 180.335 This reporting requirement pertains to disclosing information related to government-wide suspension and debarment requirements. Before a recipient enters into a grant award with FEMA, the recipient must notify FEMA if it knows if it or any of the recipient’s principals under the award fall under one or more of the four criteria listed at 2 C.F.R. § 180.335: i. Are presently excluded or disqualified; ii. Have been convicted within the preceding three years of any of the offenses listed in 2 C.F.R. § 180.800(a) or had a civil judgment rendered against it or any of the recipient’s principals for one of those offenses within that time period; iii. Are presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state, or local) with commission of any of the offenses listed in 2 C.F.R. § 180.800(a); or iv. Have had one or more public transactions (federal, state, or local) terminated within the preceding three years for cause or default. At any time after accepting the award, if the recipient learns that it or any of its principals falls under one or more of the criteria listed at 2 C.F.R. § 180.335, the recipient must provide immediate written notice to FEMA in accordance with 2 C.F.R. § 180.350. II. R EPORTING OF MATTERS RELATED TO RECIPIENT INTEGRITY AND PERFORMANCE Per 2 C.F.R. Part 200, Appendix I § F.3, the additional post-award reporting requirements in 2 C.F.R. Part 200, Appendix XII may apply to applicants who, if upon becoming recipients, have a total value of currently active grants, cooperative agreements, and procurement contracts from all federal awarding agencies that exceeds $10,000,000 for any period of time during the period of performance of an award under this funding opportunity. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 40 Recipients that meet these criteria must maintain current information reported in FAPIIS about civil, criminal, or administrative proceedings described in paragraph 2 of Appendix XII at the reporting frequency described in paragraph 4 of Appendix XII. III. SINGLE AUDIT REPORT For audits of fiscal years beginning on or after December 26, 2014, recipients that expend $750,000 or more from all federal funding sources during their fiscal year are required to submit an organization-wide financial and compliance audit report, also known as the single audit report. The audit must be performed in accordance with the requirements of U.S. Government Accountability Office’s (GAO) Government Auditing Standards, located at https://www.gao.gov/yellowbook/overview, and the requirements of Subpart F of 2 C.F.R. Part 200, located at http://www.ecfr.gov/cgi-bin/text-idx?node=sp2.1.200.f. 5. Monitoring and Oversight Per 2 C.F.R. § 200.337, FEMA, through its authorized representatives, has the right, at all reasonable times, to make site visits or conduct desk reviews to review project accomplishments and management control systems to review award progress and to provide any required technical assistance. During site visits or desk reviews, FEMA will review recipients’ files related to the award. As part of any monitoring and program evaluation activities, recipients must permit FEMA, upon reasonable notice, to review grant-related records and to interview the organization’s staff and contractors regarding the program. Recipients must respond in a timely and accurate manner to FEMA requests for information relating to the award. Effective monitoring and oversight help FEMA ensure that recipients use grant funds for their intended purpose(s); verify that projects undertaken are consistent with approved plans; and ensure that recipients make adequate progress toward stated goals and objectives. Additionally, monitoring serves as the primary mechanism to ensure that recipients comply with applicable laws, rules, regulations, program guidance, and requirements. FEMA regularly monitors all grant programs both financially and programmatically in accordance with federal laws, regulations (including 2 C.F.R. Part 200), program guidance, and the terms and conditions of the award. All monitoring efforts ultimately serve to evaluate progress towards grant goals and proactively target and address issues that may threaten grant success during the period of performance. FEMA staff will periodically monitor recipients to ensure that administrative processes, policies and procedures, budgets, and other related award criteria are meeting Federal Government-wide and FEMA regulations. Aside from reviewing quarterly financial and programmatic reports, FEMA may also conduct enhanced monitoring through either desk- based review, onsite monitoring visits, or both. Enhanced monitoring will involve the review and analysis of the financial compliance and administrative processes, policies, activities, and other attributes of each federal assistance award, and it will identify areas where the recipient may need technical assistance, corrective actions, or other support. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 41 Financial and programmatic monitoring are complementary processes within FEMA’s overarching monitoring strategy that function together to ensure effective grants management, accountability, and transparency; validate progress against grant and program goals; and safeguard federal funds against fraud, waste, and abuse. Financial monitoring primarily focuses on statutory and regulatory compliance with administrative grant requirements, while programmatic monitoring seeks to validate and assist in grant progress, targeting issues that may be hindering achievement of project goals and ensuring compliance with the purpose of the grant and grant program. Both monitoring processes are similar in that they feature initial reviews of all open awards, and additional, in-depth monitoring of grants requiring additional attention. Recipients and subrecipients who are pass-through entities are responsible for monitoring their subrecipients in a manner consistent with the terms of the federal award at 2 C.F.R. Part 200, including 2 C.F.R. § 200.332. This includes the pass-through entity’s responsibility to monitor the activities of the subrecipient as necessary to ensure that the subaward is used for authorized purposes, in compliance with federal statutes, regulations, and the terms and conditions of the subaward; and that subaward performance goals are achieved. In terms of overall award management, recipient and subrecipient responsibilities include, but are not limited to: accounting of receipts and expenditures, cash management, maintaining adequate financial records, reporting and refunding expenditures disallowed by audits, monitoring if acting as a pass-through entity, or other assessments and reviews, and ensuring overall compliance with the terms and conditions of the award or subaward, as applicable, including the terms of 2 C.F.R. Part 200. G. DHS Awarding Agency Contact Information 1. Contact and Resource Information a. Program Office Contact Jena’I Jordan National Dam Safety Program Federal Emergency Management Agency Phone: (202) 646-3286 jenai.jordan@fema.dhs.gov FEMA Grants News FEMA Grants News is a non-emergency comprehensive management and information resource developed by FEMA for grants stakeholders. This channel provides general information on all FEMA grant programs and maintains a comprehensive database containing key personnel contact information at the federal, state, and local levels. When necessary, recipients will be directed to a federal point of contact who can answer specific programmatic questions or concerns. FEMA Grants Information Desk can be reached by e-mail at fema-grants- news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9:00 AM – 5:00 PM ET. c. Grant Programs Directorate (GPD) Award Administration Division FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 42 GPD’s Award Administration Division (AAD) provides support regarding financial matters and budgetary technical assistance. Additional guidance and information can be obtained by contacting the AAD’s Help Desk via e-mail at ASK-GMD@fema.dhs.gov. d. FEMA Regional Offices FEMA Regional Offices also may provide fiscal support, including pre- and post-award administration and technical assistance such as conducting cash analysis, financial monitoring, and audit resolution to the grant program under this NOFO. National Dam Safety Program Regional Program Manager will provide programmatic support and technical assistance. will provide programmatic support and technical assistance. FEMA Regional Offices manage, administer, and conduct the application budget review, create the award package, approve, amend, and close out awards, as well as conduct cash analysis, financial and programmatic monitoring, and audit resolution for National Dam Safety Program Regional Program Manager will provide programmatic support and technical assistance. The Regions also provide technical assistance to The Regions also provide technical assistance to HHPD recipients. FEMA Regional Office contact information is available at https://www.fema.gov/fema- regional-contacts. Region Dam Safety Program Officer Phone/email Regional Grants Management Staff  Phone/email 1 Christian Oates christian.oates@fema.dhs.gov (540) 326-1601 Tracy Narbeth tracy.narbeth@fema.dhs.gov (617) 306-9492 2 Regina Majercak regina.majercak@fema.dhs.gov (917) 561-3256 George W. Hogan III George.Hoganiii@fema.dhs.gov (212) 680-8599 3 Kristen Jones kristen.jones@fema.dhs.gov (267) 896-1116 Mark Lockett mark.lockett@fema.dhs.gov (215) 435-5256 4 Katy Goolsby- Brown & Nathaniel Sims, Sr. katy.goolsby- brown@fema.dhs.gov (770) 220-8811 nathaniel.simssr@fema.dhs.gov (770) 220-5200 Ceporia McMillian ceporia.mcmillian@fema.dhs.gov (202) 717-7096 5 FEMA HHPD fema-ndsp@fema.dhs.gov Jason Kirkman Jason.kirkman@fema.dhs.gov (312) 852-5580 6 John Miles, Jr. john.milesjr@fema.dhs.gov (816) 533-2873 David McCoy David.McCoy3@fema.dhs.gov (940) 383-7324 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 43 7 Dawn Livingston dawn.livingston@fema.dhs.gov Office: (816) 283-7055 Mobile: (816) 810-1609 Shelly Kirk Shelly.Kirk@fema.dhs.gov (816) 809-3279 8 Richard Hansen richard.hansen@fema.dhs.gov (303) 235-4807 Dan Carlson Dan.Carlson@fema.dhs.gov (303) 235-4825 9 Scott Nielsen scott.nielsen@fema.dhs.gov (510) 219-4510 Edita Billingsley Edita.billingsley@fema.dhs.gov (510) 627-7209 10 Nathan Stueve nathan.stueve@fema.dhs.gov (425) 301-6247 Kim Penfold kim.penfold@fema.dhs.gov (425) 487-4760 e. Equal Rights The FEMA Office of Equal Rights (OER) is responsible for compliance with and enforcement of federal civil rights obligations in connection with programs and services conducted by FEMA and recipients of FEMA financial assistance. All inquiries and communications about federal civil rights compliance for FEMA grants under this NOFO should be sent to FEMA-CivilRightsOffice@fema.dhs.gov. f. Environmental Planning and Historic Preservation GPD’s EHP Team provides guidance and information about the EHP review process to recipients and subrecipients. All inquiries and communications about GPD projects under this NOFO or the EHP review process, including the submittal of EHP review materials, should be sent to gpdehpinfo@fema.dhs.gov. The FEMA Office of Environmental Planning and Historic Preservation (OEHP) provides guidance and information about the EHP review process to FEMA programs and FEMA’s recipients and subrecipients. All inquiries and communications about EHP compliance for FEMA grant projects under this NOFO or the EHP review process should be sent to FEMA- OEHP-NOFOQuestions@fema.dhs.gov. 2. Systems Information a. Grants.gov For technical assistance with Grants.gov, call the customer support hotline 24 hours per day, 7 days per week (except federal holidays) at (800) 518-4726 or e-mail at support@grants.gov. b. Payment and Reporting System (FEMA GO) FEMA uses the FEMA GO system for financial reporting, invoicing, and tracking payments. FEMA uses the Direct Deposit/Electronic Funds Transfer (DD/EFT) method of payment to recipients. If you have questions about the online system, please call the Customer Service Center at (866) 927-5646 or email ask-GMD@fema.dhs.gov. c. FEMA Grant Outcomes (GO) FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 44 For technical assistance with the FEMA GO system, please contact the FEMA GO Helpdesk at femago@fema.dhs.gov or (877) 611-4700, Monday through Friday, 9:00 AM – 6:00 PM ET. H. Additional Information I. Termination Provisions FEMA may terminate a federal award in whole or in part for one of the following reasons. FEMA and the recipient must still comply with closeout requirements at 2 C.F.R. §§ 200.344-200.345 even if an award is terminated in whole or in part. To the extent that subawards are permitted under this NOFO, pass-through entities should refer to 2 C.F.R. § 200.340 for additional information on termination regarding subawards. a. Noncompliance If a recipient fails to comply with the terms and conditions of a federal award, FEMA may terminate the award in whole or in part. If the noncompliance can be corrected, FEMA may first attempt to direct the recipient to correct the noncompliance. This may take the form of a Compliance Notification. If the noncompliance cannot be corrected or the recipient is non- responsive, FEMA may proceed with a Remedy Notification, which could impose a remedy for noncompliance per 2 C.F.R. § 200.339, including termination. Any action to terminate based on noncompliance will follow the requirements of 2 C.F.R. §§ 200.341-200.342 as well as the requirement of 2 C.F.R. § 200.340(c) to report in FAPIIS the recipient’s material failure to comply with the award terms and conditions. See also the section on Actions to Address Noncompliance in this NOFO. b. With the Consent of the Recipient FEMA may also terminate an award in whole or in part with the consent of the recipient, in which case the parties must agree upon the termination conditions, including the effective date, and in the case of partial termination, the portion to be terminated. c. Notification by the Recipient The recipient may terminate the award, in whole or in part, by sending written notification to FEMA setting forth the reasons for such termination, the effective date, and in the case of partial termination, the portion to be terminated. In the case of partial termination, FEMA may determine that a partially terminated award will not accomplish the purpose of the federal award, so FEMA may terminate the award in its entirety. If that occurs, FEMA will follow the requirements of 2 C.F.R. §§ 200.341-200.342 in deciding to fully terminate the award. 2. Program Evaluation Recipients and subrecipients are encouraged to incorporate program evaluation activities from the outset of their program design and implementation to meaningfully document and measure their progress towards meeting an agency priority goal(s). Title I of the Foundations for Evidence-Based Policymaking Act of 2018 (Evidence Act), Pub. L. No. 115-435 (2019) urges federal awarding agencies and federal assistance recipients and subrecipients to use program evaluation as a critical tool to learn, to improve equitable delivery, and to elevate program service and delivery across the program lifecycle. Evaluation means “an assessment FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 45 using systematic data collection and analysis of one or more programs, policies, and organizations intended to assess their effectiveness and efficiency.” Evidence Act § 101 (codified at 5 U.S.C. § 311). Evaluation costs are allowable costs (either as direct or indirect), unless prohibited by statute or regulation. In addition, recipients are required to participate in a DHS-led evaluation if selected, which may be carried out by a third-party on behalf of the Program Office or DHS. By accepting grant funds, recipients agree to participate in the evaluation, which may include analysis of individuals who benefit from the grant, and provide access to program operating personnel and participants, as specified by the evaluator(s) during the award. 3. Period of Performance Extensions Extensions to the period of performance (POP) for this program are allowed. Extensions to the POP identified in the award will only be considered through formal, written requests to the recipient’s Regional Grants Program Office and must contain specific and compelling justifications as to why an extension is required. Recipients are advised to coordinate with the FEMA Regional Program Analyst as needed when preparing an extension request. All extension requests must address the following: a. The grant program, fiscal year, and award number; b. Reason for the delay –including details of the legal, policy, or operational challenges that prevent the final outlay of awarded funds by the deadline; c. Current status of the activity(ies); d. Approved POP termination date and new project completion date; e. Amount of funds drawn down to date; f. Remaining available funds, both federal and, if applicable, non-federal; g. Budget outlining how remaining federal and, if applicable, non-federal funds will be expended; h. Plan for completion, including milestones and timeframes for achieving each milestone and the position or person responsible for implementing the plan for completion; and i. Certification that the activity(ies) will be completed within the extended POP without any modification to the original statement of work, as described in the Rehabilitation of High Hazard Potential Dam Guidance and as approved by FEMA. Other documents required by this funding opportunity, terms and conditions of the award, or other FEMA guidance. Extension requests will be granted only due to compelling legal, policy, or operational challenges. Extension requests will only be considered for the following reasons: ￿ Contractual commitments by the recipient or subrecipient with vendors prevent completion of the project, including delivery of equipment or services, within the existing POP; ￿ The project must undergo a complex environmental review that cannot be completed within the existing POP; ￿ Projects are long-term by design, and therefore acceleration would compromise core programmatic goals; or FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 46 ￿ Where other special or extenuating circumstances exist. Recipients should submit all proposed extension requests to FEMA for review and approval at least 60 days prior to the end of the POP to allow sufficient processing time. Extensions are typically granted for no more than a six-month period. 4. Disability Integration Pursuant to Section 504 of the Rehabilitation Act of 1973, recipients of FEMA financial assistance must ensure that their programs and activities do not discriminate against other qualified individuals with disabilities. Grant recipients should engage with the whole community to advance individual and community preparedness and to work as a nation to build and sustain resilience. In doing so, recipients are encouraged to consider the needs of individuals with disabilities into the activities and projects funded by the grant. FEMA expects that the integration of the needs of people with disabilities will occur at all levels, including planning; alerting, notification, and public outreach; training; purchasing of equipment and supplies; protective action implementation; and exercises/drills. The following are examples that demonstrate the integration of the needs of people with disabilities in carrying out FEMA awards: ￿ Include representatives of organizations that work with/for people with disabilities on planning committees, work groups and other bodies engaged in development and implementation of the grant programs and activities. ￿ Hold all activities related to the grant in locations that are accessible to persons with physical disabilities to the extent practicable. ￿ Acquire language translation services, including American Sign Language, that provide public information across the community and in shelters. ￿ Ensure shelter-specific grant funds are in alignment with FEMA’s Guidance on Planning for Integration of Functional Needs Support Services in General Population Shelters. ￿ If making alterations to an existing building to a primary function area utilizing federal funds, complying with the most recent codes and standards, and making path of travel to the primary function area accessible to the greatest extent possible. ￿ Implement specific procedures used by public transportation agencies that include evacuation and passenger communication plans and measures for individuals with disabilities. ￿ Identify, create, and deliver training to address any training gaps specifically aimed toward whole-community preparedness. Include and interact with individuals with disabilities, aligning with the designated program capability. ￿ Establish best practices in inclusive planning and preparedness that consider physical access, language access, and information access. Examples of effective communication access include providing auxiliary aids and services such as sign language interpreters, Computer Aided Real-time Translation (CART), and materials in Braille or alternate formats. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 47 FEMA grant recipients can fund projects towards the resiliency of the whole community, including people with disabilities, such as training, outreach, and safety campaigns, provided that the project aligns with this NOFO and the terms and conditions of the award. 5. Conflicts of Interest in the Administration of Federal Awards or Subawards For conflicts of interest under grant-funded procurements and contracts, refer to the section on Procurement Integrity in this NOFO and 2 C.F.R. §§ 200.317 – 200.327. To eliminate and reduce the impact of conflicts of interest in the subaward process, recipients and pass-through entities must follow their own policies and procedures regarding the elimination or reduction of conflicts of interest when making subawards. Recipients and pass-through entities are also required to follow any applicable federal and state, local, tribal, or territorial (SLTT) statutes or regulations governing conflicts of interest in the making of subawards. The recipient or pass-through entity must disclose to the respective Program Analyst or Program Manager, in writing, any real or potential conflict of interest that may arise during the administration of the federal award, as defined by the federal or SLTT statutes or regulations or their own existing policies, within five days of learning of the conflict of interest. Similarly, subrecipients, whether acting as subrecipients or as pass-through entities, must disclose any real or potential conflict of interest to the recipient or next-level pass- through entity as required by the recipient or pass-through entity’s conflict of interest policies, or any applicable federal or SLTT statutes or regulations. Conflicts of interest may arise during the process of FEMA making a federal award in situations where an employee, officer, or agent, any members of his or her immediate family, his or her partner has a close personal relationship, a business relationship, or a professional relationship, with an applicant, sub applicant, recipient, subrecipient, or FEMA employees. 6. Procurement Integrity Through audits conducted by the DHS Office of Inspector General (OIG) and FEMA grant monitoring, findings have shown that some FEMA recipients have not fully adhered to the proper procurement requirements at 2 C.F.R. §§ 200.317 – 200.327 when spending grant funds. Anything less than full compliance with federal procurement requirements jeopardizes the integrity of the grant as well as the grant program. To assist with determining whether an action is a procurement or instead a subaward, please consult 2 C.F.R. § 200.331. For detailed guidance on the federal procurement standards, recipients and subrecipients should refer to various materials issued by FEMA’s Procurement Disaster Assistance Team (PDAT), such as the PDAT Field Manual and Contract Provisions Guide. Additional resources, including an upcoming trainings schedule can be found on the PDAT Website: https://www.fema.gov/grants/procurement. The below highlights the federal procurement requirements for FEMA recipients when procuring goods and services with federal grant funds. FEMA will include a review of recipients’ procurement practices as part of the normal monitoring activities. All FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 48 procurement activity must be conducted in accordance with federal procurement standards at 2 C.F.R. §§ 200.317 – 200.327. Select requirements under these standards are listed below. The recipient and any of its subrecipients must comply with all requirements, even if they are not listed below. Under 2 C.F.R. § 200.317, when procuring property and services under a federal award, states (including territories) must follow the same policies and procedures they use for procurements from their non-federal funds; additionally, states must now follow 2 C.F.R. § 200.321 regarding socioeconomic steps, 200.322 regarding domestic preferences for procurements, 200.323 regarding procurement of recovered materials, and 2 C.F.R. § 200.327 regarding required contract provisions. All other non-federal entities, such as tribes (collectively, non-state entities), must have and use their own documented procurement procedures that reflect applicable SLTT laws and regulations, provided that the procurements conform to applicable federal law and the standards identified in 2 C.F.R. Part 200. These standards include, but are not limited to, providing for full and open competition consistent with the standards of 2 C.F.R. § 200.319 and the required procurement methods at § 200.320. a. Important Changes to Procurement Standards in 2 C.F.R. Part 200 OMB recently updated various parts of Title 2 of the Code of Federal Regulations, among them, the procurement standards. States are now required to follow the socioeconomic steps in soliciting small and minority businesses, women’s business enterprises, and labor surplus area firms per 2 C.F.R. § 200.321. All non-federal entities should also, to the greatest extent practicable under a federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States per 2 C.F.R. § 200.322. More information on OMB’s revisions to the federal procurement standards can be found in Purchasing Under a FEMA Award: OMB Revisions Fact Sheet. The recognized procurement methods in 2 C.F.R. § 200.320 have been reorganized into informal procurement methods, which include micro-purchases and small purchases; formal procurement methods, which include sealed bidding and competitive proposals; and noncompetitive procurements. The federal micro-purchase threshold is currently $10,000, and non-state entities may use a lower threshold when using micro-purchase procedures under a FEMA award. If a non-state entity wants to use a micro-purchase threshold higher than the federal threshold, it must follow the requirements of 2 C.F.R. § 200.320(a)(1)(iii)- (v). The federal simplified acquisition threshold is currently $250,000, and a non-state entity may use a lower threshold but may not exceed the federal threshold when using small purchase procedures under a FEMA award. See 2 C.F.R. § 200.1 (citing the definition of simplified acquisition threshold from 48 C.F.R. Part 2, Subpart 2.1). See 2 C.F.R. §§ 200.216, 200.471, and Appendix II as well as section D.13.a of the NOFO regarding prohibitions on covered telecommunications equipment or services. b. Competition and Conflicts of Interest FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 49 Among the requirements of 2 C.F.R. § 200.319(b) applicable to all non-federal entities other than states, in order to ensure objective contractor performance and eliminate unfair competitive advantage, contractors that develop or draft specifications, requirements, statements of work, or invitations for bids or requests for proposals must be excluded from competing for such procurements. FEMA considers these actions to be an organizational conflict of interest and interprets this restriction as applying to contractors that help a non- federal entity develop its grant application, project plans, or project budget. This prohibition also applies to the use of former employees to manage the grant or carry out a contract when those former employees worked on such activities while they were employees of the non- federal entity. Under this prohibition, unless the non-federal entity solicits for and awards a contract covering both development and execution of specifications (or similar elements as described above), and this contract was procured in compliance with 2 C.F.R. §§ 200.317 – 200.327, federal funds cannot be used to pay a contractor to carry out the work if that contractor also worked on the development of those specifications. This rule applies to all contracts funded with federal grant funds, including pre-award costs, such as grant writer fees, as well as post- award costs, such as grant management fees. Additionally, some of the situations considered to be restrictive of competition include, but are not limited to: ￿ Placing unreasonable requirements on firms for them to qualify to do business; ￿ Requiring unnecessary experience and excessive bonding; ￿ Noncompetitive pricing practices between firms or between affiliated companies; ￿ Noncompetitive contracts to consultants that are on retainer contracts; ￿ Organizational conflicts of interest; ￿ Specifying only a “brand name” product instead of allowing “an equal” product to be offered and describing the performance or other relevant requirements of the procurement; and ￿ Any arbitrary action in the procurement process. Per 2 C.F.R. § 200.319(c), non-federal entities other than states must conduct procurements in a manner that prohibits the use of statutorily or administratively imposed SLTT geographical preferences in the evaluation of bids or proposals, except in those cases where applicable federal statutes expressly mandate or encourage geographic preference. Nothing in this section preempts state licensing laws. When contracting for architectural and engineering services, geographic location may be a selection criterion provided its application leaves an appropriate number of qualified firms, given the nature and size of the project, to compete for the contract. Under 2 C.F.R. § 200.318(c)(1), non-federal entities other than states are required to maintain written standards of conduct covering conflicts of interest and governing the actions of their employees engaged in the selection, award, and administration of contracts. No employee, officer, or agent may participate in the selection, award, or administration of a contract supported by a federal award if he or she has a real or apparent conflict of interest. Such conflicts of interest would arise when the employee, officer or agent, any member of FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 50 his or her immediate family, his or her partner, or an organization that employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from a firm considered for a contract. The officers, employees, and agents of the non-federal entity may neither solicit nor accept gratuities, favors, or anything of monetary value from contractors or parties to subcontracts. However, non-federal entities may set standards for situations in which the financial interest is not substantial, or the gift is an unsolicited item of nominal value. The standards of conduct must provide for disciplinary actions to be applied for violations of such standards by officers, employees, or agents of the non-federal entity. Under 2 C.F.R. 200.318(c)(2), if the recipient or subrecipient (other than states) has a parent, affiliate, or subsidiary organization that is not a state, local, tribal, or territorial government, the non-federal entity must also maintain written standards of conduct covering organizational conflicts of interest. In this context, organizational conflict of interest means that because of a relationship with a parent company, affiliate, or subsidiary organization, the non-federal entity is unable or appears to be unable to be impartial in conducting a procurement action involving a related organization. The non-federal entity must disclose in writing any potential conflicts of interest to FEMA or the pass-through entity in accordance with applicable FEMA policy. c. Supply Schedules and Purchasing Programs Generally, a non-federal entity may seek to procure goods or services from a federal supply schedule, state supply schedule, or group purchasing agreement. I. G ENERAL SERVICES ADMINISTRATION SCHEDULES States, tribes, and local governments, and any instrumentality thereof (such as local education agencies or institutions of higher education) may procure goods and services from a General Services Administration (GSA) schedule. GSA offers multiple efficient and effective procurement programs for state, tribal, and local governments, and instrumentalities thereof, to purchase products and services directly from pre-vetted contractors. The GSA Schedules (also referred to as the Multiple Award Schedules and the Federal Supply Schedules) are long-term government-wide contracts with commercial firms that provide access to millions of commercial products and services at volume discount pricing. Information about GSA programs for states, tribes, and local governments, and instrumentalities thereof, can be found at https://www.gsa.gov/resources-for/programs-for- State-and-local-governments and https://www.gsa.gov/buying-selling/purchasing- programs/gsa-schedules/schedule-buyers/state-and-local-governments. For tribes, local governments, and their instrumentalities that purchase off of a GSA schedule, this will satisfy the federal requirements for full and open competition provided that the recipient follows the GSA ordering procedures; however, tribes, local governments, and their instrumentalities will still need to follow the other rules under 2 C.F.R. §§ 200.317 – 200.327, such as solicitation of minority businesses, women’s business enterprises, small businesses, or labor surplus area firms (§ 200.321), domestic preferences (§ 200.322), FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 51 contract cost and price (§ 200.324), and required contract provisions (§ 200.327 and Appendix II). II. O THER SUPPLY SCHEDULES AND PROGRAMS For non-federal entities other than states, such as tribes, local governments, and nonprofits, that want to procure goods or services from a state supply schedule, cooperative purchasing program, or other similar program, in order for such procurements to be permissible under federal requirements, the following must be true: ￿ The procurement of the original contract or purchasing schedule and its use by the non-federal entity complies with state and local law, regulations, and written procurement procedures; ￿ The state or other entity that originally procured the original contract or purchasing schedule entered into the contract or schedule with the express purpose of making it available to the non-federal entity and other similar types of entities; ￿ The contract or purchasing schedule specifically allows for such use, and the work to be performed for the non-federal entity falls within the scope of work under the contract as to type, amount, and geography; ￿ The procurement of the original contract or purchasing schedule complied with all the procurement standards applicable to a non-federal entity other than states under at 2 C.F.R. §§ 200.317 – 200.327; and ￿ With respect to the use of a purchasing schedule, the non-federal entity must follow ordering procedures that adhere to applicable state, tribal, and local laws and regulations and the minimum requirements of full and open competition under 2 C.F.R. Part 200. If a non-federal entity other than a state seeks to use a state supply schedule, cooperative purchasing program, or other similar type of arrangement, FEMA recommends the recipient discuss the procurement plans with its regional FEMA Grant Program Manager / Specialist. d. Procurement Documentation Per 2 C.F.R. § 200.318(i), non-federal entities other than states and territories are required to maintain and retain records sufficient to detail the history of procurement covering at least the rationale for the procurement method, selection of contract type, contractor selection or rejection, and the basis for the contract price. States and territories are encouraged to maintain and retain this information as well and are reminded that in order for any cost to be allowable, it must be adequately documented per 2 C.F.R. § 200.403(g). Examples of the types of documents that would cover this information include but are not limited to: ￿ Solicitation documentation, such as requests for quotes, invitations for bids, or requests for proposals; ￿ Responses to solicitations, such as quotes, bids, or proposals; ￿ Pre-solicitation independent cost estimates and post-solicitation cost/price analyses on file for review by federal personnel, if applicable; ￿ Contract documents and amendments, including required contract provisions; and FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 52 ￿ Other documents required by federal regulations applicable at the time a grant is awarded to a recipient. • Additional information on required procurement records can be found on pages 24-26 of the PDAT Field Manual. 7. FEMA Financial Assistance Programs for Infrastructure Build America, Buy America Act Recipients and subrecipients must comply with the Build America, Buy America Act (BABAA), which was enacted as part of the Infrastructure Investment and Jobs Act §§ 70901-70927, Pub. L. No. 117-58 (2021); and Executive Order 14005, Ensuring the Future is Made in All of America by All of America’s Workers. See also 2 C.F.R. Part 184 and OMB MemorandumM-24-02, Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure. Section 70914 of BABAA requires all federal agencies, including FEMA, to ensure that none of the funds provided under this program may be used for a project for infrastructure unless the iron and steel, manufactured products, and construction materials used in that infrastructure are produced in the United States. For FEMA financial assistance programs, these requirements apply to new infrastructure awards made on or after January 2, 2023, as well as new funding FEMA obligates to existing awards or through renewal awards on or after January 2, 2023. The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project. To see whether a particular FEMA federal financial assistance program is considered an infrastructure program and thus required to include a Buy America preference, please see Programs and Definitions: Build America, Buy America Act | FEMA.gov. To ensure compliance with BABAA, all recipient and subrecipient contracts under FEMA infrastructure awards must include a contract provision explaining the BABAA requirements and a self-certification where the contracts can certify compliance with the domestic preference requirements, unless the BABAA requirement is waived by FEMA. Please see Buy America Preference in FEMA Financial Assistance Programs for Infrastructure FEMA Interim Policy #207-22-0001. a. Waivers FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 53 When necessary, recipients (and subrecipients through their pass-through entity) may apply for, and FEMA may grant, a waiver from these requirements. A waiver of the domestic content procurement preference may be granted by the agency awarding official if FEMA determines that: 1) Applying the domestic content procurement preference would be inconsistent with the public interest. 2) The types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality. 3) The inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25%. Prior to requesting a waiver, recipients and subrecipients should consider whether a FEMA approved general applicability waiver applies to their projects. The term “general applicability waiver” refers to a waiver that applies generally across multiple awards and do not require a separate application or approval by FEMA prior to use. These may cover categories of products known to be unavailable domestically or are intended to ease the burden of compliance. For a list of FEMA’s general applicability waivers, and for additional information on FEMA’s process for requesting a project- specific waiver from the Buy America preference requirements, please see FEMA’s website at: "Buy America" Preference in FEMA Financial Assistance Programs for Infrastructure | FEMA.gov. b. Definitions For BABAA specific definitions, please refer to the FEMA Buy America website at: Programs and Definitions: Build America, Buy America Act | FEMA.gov. c. Please refer to the applicable DHS Standard Terms & Conditions for the BABAA specific term applicable to all FEMA financial assistance awards for infrastructure. 8. Record Retention a. Record Retention Period Financial records, supporting documents, statistical records, and all other non-Federal entity records pertinent to a federal award generally must be maintained for at least three years from the date the final FFR is submitted. See 2 C.F.R. § 200.334. Further, if the recipient does not submit a final FFR and the award is administratively closed, FEMA uses the date of administrative closeout as the start of the general record retention period. The record retention period may be longer than three years or have a different start date in certain cases. These include: FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 54 ￿ Records for real property and equipment acquired with Federal funds must be retained for three years after final disposition of the property. See 2 C.F.R. § 200.334(c). ￿ If any litigation, claim, or audit is started before the expiration of the three-year period, the records must be retained until all litigation, claims, or audit findings involving the records have been resolved and final action taken. See 2 C.F.R. § 200.334(a). ￿ The record retention period will be extended if the non-federal entity is notified in writing of the extension by FEMA, the cognizant or oversight agency for audit, or the cognizant agency for indirect costs, or pass-through entity. See 2 C.F.R. § 200.334(b). ￿ Where FEMA requires recipients to report program income after the period of performance ends, the program income record retention period begins at the end of the recipient’s fiscal year in which program income is earned. See 2 C.F.R. § 200.334(e). ￿ For indirect cost rate computations and proposals, cost allocation plans, or any similar accounting computations of the rate at which a particular group of costs is chargeable (such as computer usage chargeback rates or composite fringe benefit rates), the start of the record retention period depends on whether the indirect cost rate documents were submitted for negotiation. If the indirect cost rate documents were submitted for negotiation, the record retention period begins from the date those documents were submitted for negotiation. If indirect cost rate documents were not submitted for negotiation, the record retention period begins at the end of the recipient’s fiscal year or other accounting period covered by that indirect cost rate. See 2 C.F.R. § 200.334(f). b. Types of Records to Retain FEMA requires that non-federal entities maintain the following documentation for federally funded purchases: ￿ Specifications ￿ Solicitations ￿ Competitive quotes or proposals ￿ Basis for selection decisions ￿ Purchase orders ￿ Contracts ￿ Invoices ￿ Cancelled checks Non-federal entities should keep detailed records of all transactions involving the grant. FEMA may at any time request copies of any relevant documentation and records, including purchasing documentation along with copies of cancelled checks for verification. See, e.g., 2 C.F.R. §§ 200.318(i), 200.334, 200.337. In order for any cost to be allowable, it must be adequately documented per 2 C.F.R. § 200.403(g). Non-federal entities who fail to fully document all purchases may find their expenditures questioned and subsequently disallowed. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 55 9. Actions to Address Noncompliance Non-federal entities receiving financial assistance funding from FEMA are required to comply with requirements in the terms and conditions of their awards or subawards, including the terms set forth in applicable federal statutes, regulations, NOFOs, and policies. Throughout the award lifecycle or even after an award has been closed, FEMA or the pass- through entity may discover potential or actual noncompliance on the part of a recipient or subrecipient. This potential or actual noncompliance may be discovered through routine monitoring, audits, closeout, or reporting from various sources. In the case of any potential or actual noncompliance, FEMA may place special conditions on an award per 2 C.F.R. §§ 200.208 and 200.339, FEMA may place a hold on funds until the matter is corrected, or additional information is provided per 2 C.F.R. § 200.339, or it may do both. Similar remedies for noncompliance with certain federal civil rights laws are authorized pursuant to 44 C.F.R. Parts 7 and 19. In the event the noncompliance is not able to be corrected by imposing additional conditions or the recipient or subrecipient refuses to correct the matter, FEMA might take other remedies allowed under 2 C.F.R. § 200.339. These remedies include actions to disallow costs, recover funds, wholly or partly suspend, or terminate the award, initiate suspension, and debarment proceedings, withhold further federal awards, or take other remedies that may be legally available. For further information on termination due to noncompliance, see the section on Termination Provisions in the NOFO. FEMA may discover and take action on noncompliance even after an award has been closed. The closeout of an award does not affect FEMA’s right to disallow costs and recover funds as long the action to disallow costs takes place during the record retention period. See 2 C.F.R. §§ 200.334, 200.345(a). Closeout also does not affect the obligation of the non-federal entity to return any funds due as a result of later refunds, corrections, or other transactions. 2 C.F.R. § 200.345(a)(2). The types of funds FEMA might attempt to recover include, but are not limited to, improper payments, cost share reimbursements, program income, interest earned on advance payments, or equipment disposition amounts. FEMA may seek to recover disallowed costs through a Notice of Potential Debt Letter, a Remedy Notification, or other letter. The document will describe the potential amount owed, the reason why FEMA is recovering the funds, the recipient’s appeal rights, how the amount can be paid, and the consequences for not appealing or paying the amount by the deadline. If the recipient neither appeals nor pays the amount by the deadline, the amount owed will become final. Potential consequences if the debt is not paid in full or otherwise resolved by the deadline include the assessment of interest, administrative fees, and penalty charges; administratively offsetting the debt against other payable federal funds; and transferring the debt to the U.S. Department of the Treasury for collection. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 56 FEMA notes the following common areas of noncompliance for FEMA’s grant programs: ￿ Insufficient documentation and lack of record retention. ￿ Failure to follow the procurement under grants requirements. ￿ Failure to submit closeout documents in a timely manner. ￿ Failure to follow EHP requirements. ￿ Failure to comply with the POP deadline. 10. Audits FEMA grant recipients are subject to audit oversight from multiple entities including the DHS OIG, the GAO, the pass-through entity, or independent auditing firms for single audits, and may cover activities and costs incurred under the award. Auditing agencies such as the DHS OIG, the GAO, and the pass-through entity (if applicable), and FEMA in its oversight capacity, must have access to records pertaining to the FEMA award. Recipients and subrecipients must retain award documents for at least three years from the date the final FFR is submitted, and even longer in many cases subject to the requirements of 2 C.F.R. § 200.334. In the case of administrative closeout, documents must be retained for at least three years from the date of closeout, or longer subject to the requirements of 2 C.F.R. § 200.334. If documents are retained longer than the required retention period, the DHS OIG, the GAO, and the pass-through entity, as well as FEMA in its oversight capacity, have the right to access these records as well. See 2 C.F.R. §§ 200.334, 200.337. Additionally, non-federal entities must comply with the single audit requirements at 2 C.F.R. Part 200, Subpart F. Specifically, non-federal entities, other than for-profit subrecipients, that expend $750,000 or more in federal awards during their fiscal year must have a single or program-specific audit conducted for that year in accordance with Subpart F. 2 C.F.R. § 200.501. A single audit covers all federal funds expended during a fiscal year, not just FEMA funds. The cost of audit services may be allowable per 2 C.F.R. § 200.425, but non-federal entities must select auditors in accordance with 2 C.F.R. § 200.509, including following the proper procurement procedures. For additional information on single audit reporting requirements, (See F.4c,”Additional Reporting Requirements” or other applicable document). The objectives of single audits are to: ￿ Determine if financial statements conform to generally accepted accounting principles (GAAP); ￿ Determine whether the schedule of expenditures of federal awards is presented fairly; ￿ Understand, assess, and test the adequacy of internal controls for compliance with major programs; and ￿ Determine if the entity complied with applicable laws, regulations, and contracts or grants. For single audits, the auditee is required to prepare financial statements reflecting its financial position, a schedule of federal award expenditures, and a summary of the status of prior audit findings and questioned costs. The auditee also is required to follow up and take appropriate corrective actions on new and previously issued but not yet addressed audit findings. The auditee must prepare a corrective action plan to address the new audit findings. 2 C.F.R. §§ 200.508, 200.510, 200.511. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 57 Non-federal entities must have an audit conducted, either single or program-specific, of their financial statements and federal expenditures annually or biennially pursuant to 2 C.F.R. § 200.504. Non-federal entities must also follow the information submission requirements of 2 C.F.R. § 200.512, including submitting the audit information to the Federal Audit Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or nine months after the end of the audit period. The audit information to be submitted include the data collection form described at 2 C.F.R. § 200.512(c) and Appendix X to 2 C.F.R. Part 200 as well as the reporting package described at 2 C.F.R. § 200.512(b). The non-federal entity must retain one copy of the data collection form and one copy of the reporting package for three years from the date of submission to the Federal Audit Clearinghouse. 2 C.F.R. § 200.512; see also 2 C.F.R. § 200.517 (setting requirements for retention of documents by the auditor and access to audit records in the auditor’s possession). FEMA, the DHS OIG, the GAO, and the pass-through entity (if applicable), as part of monitoring or as part of an audit, may review a non-federal entity’s compliance with the single audit requirements. In cases of continued inability or unwillingness to have an audit conducted in compliance with 2 C.F.R. Part 200, Subpart F, FEMA, and the pass-through entity, if applicable, are required to take appropriate remedial action under 2 C.F.R. § 200.339 for noncompliance, pursuant to 2 C.F.R. § 200.505. 11. Payment Information FEMA uses the Direct Deposit/Electronic Funds Transfer (DD/EFT) method of payment to recipients. Payment requests are submitted through FEMA GO. 12. Whole Community Preparedness Preparedness is a shared responsibility that calls for the involvement of everyone—not just the government—in preparedness efforts. By working together, everyone can help keep the nation safe from harm and help keep it resilient when struck by hazards, such as natural disasters, acts of terrorism, and pandemics. Whole Community includes: ￿ Individuals and families, including those with access and functional needs ￿ Businesses ￿ Faith-based and community organizations ￿ Nonprofit groups ￿ Schools and academia ￿ Media outlets ￿ All levels of government, including state, local, tribal, territorial, and federal partners The phrase “Whole Community” often appears in preparedness materials, as it is one of the guiding principles. It means two things: 1. Involving people in the development of national preparedness documents. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 58 2. Ensuring their roles and responsibilities are reflected in the content of the materials. 13. Example Mitigation Plan Extension Request Template Mitigation Plan Extraordinary Circumstances Request - Applicant Template (States) [Appropriate Branch Chief or FEMA Program Officer] National Dam Safety Program Federal Emergency Management Agency [Office Address Street] [Office City, State Zip] Submitted via FEMA GO Reference: Request approval of 12-month extension to update the approved mitigation plan under “Mitigation Plan Extraordinary Circumstances” in order to receive funding under the Rehabilitation of High Hazard Potential Dams Grant Program Dear (Insert Name): The [insert Applicant name] in consultation and coordination with [insert name of agency/ies responsible for updating the approved local or tribal mitigation plan (compliant with 44 C.F.R. Part 201 and Local Mitigation Planning Policy Guide (FEMA, April 2022) or subsequent update or Tribal Mitigation Plan Review Guide (December 2017)) either for the subrecipient or for the jurisdiction where the dam is located] requests approval for the Mitigation Plan Extraordinary Circumstances extension as stated on page [Insert page number] of the Rehabilitation of High Hazard Potential Dams (HHPD) Grant Program Notice of Funding Opportunity (NOFO). [For local or tribal mitigation plan(s) where the dam is located that require updates, insert the following text] With respect to the following local and/or tribal government and/or nonprofit organization subrecipients, I/we have included the documentation requested on page [Insert page number] of the NOFO (6.c.) to request an extension to the approved local or tribal mitigation plan requirements (compliant with 44 C.F.R. Part 201 and Local Mitigation Planning Policy Guide (FEMA, April 2022) or subsequent update or Tribal Mitigation Plan Review Guide (December 2017)) for the jurisdiction where the dam is located in order to receive HHPD funding. We understand, if our request is approved, that the following currently approved local and/or tribal mitigation plans for the jurisdiction where the dam is located will need to be updated to address all dam risks in accordance with requirements set forth in the Local Mitigation Planning Policy Guide (FEMA, April 2022), which supersede the requirements set forth in the Rehabilitation of High Hazard Potential Dams Grant Program Guidance (FEMA, June 2020) and the FEMA Policy 104- 008-7 within twelve (12) months from the date FEMA Grants Program Directorate approves the SOW package in FEMA GO or FEMA may terminate the award or explore other remedies as appropriate as described on page x of the NOFO: FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 59 • [Insert list] If you have any questions, please contact me at [insert phone # and email address]. Sincerely, [Recipient name, title]; and [State Hazard Mitigation Officer or state mitigation planner name, title]; and [Agency Responsible for Updating subrecipient HM Plan where the dam is located name, title] cc: FEMA Regional National Dam Safety Program Point of Contact Attachments: • Approach, schedule, and milestones (workplan) for updating approved local or tribal mitigation plan(s) to include all dam risks to include the requirements set forth in the Local Mitigation Planning Policy Guide (FEMA, April 2022), which supersede the requirements set forth in the Rehabilitation of High Hazard Potential Dams Grant Program Guidance (FEMA, June 2020) and the FEMA Policy 104- 008-7, including allowing time for FEMA review and approval • Documentation supporting the determination of Extraordinary Circumstances for each subrecipient 14. Examples Using Funding Formula The following example demonstrates the funding formula. Assume eleven states apply for funding in a given year, with the number of eligible dams as shown in Table 1. Table 1: Example – Number Eligible Number of States Dams and Eligible Dams State State 1 3 State 2 10 State 3 2 State 4 5 State 5 8 State 6 7 State 7 14 State 8 6 State 9 4 State 10 9 State 11 5 Total Eligible Dams 73 FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 60 Step [i]. Using the funding formula, 1/3 of the $11,640,000.00 in available funding ($3,880,000.00) would be divided evenly between the eleven states, totaling $352,727.27 to each of the eleven states. Step [ii]. There are a total of 73 eligible dams in the eleven states that submitted applications. The remaining 2/3 of the available funding ($7,760,000.00) would be distributed as shown: Table 2: Example – Ratio of State’s Eligible Resulting Funding Resulting Funding Using Dams to All Eligible Formula State Dams State 1 3/73 $352,727.27 + $7,760,000.00 x (3/73) = $671,631.39 State 2 10/73 $352,727.27 + $7,760,000.00 x (10/73) = $1,415,740.98 State 3 2/73 $352,727.27 + $7,760,000.00 x (2/73) = $565,330.01 State 4 5/73 $352,727.27 + $7,760,000.00 x (5/73) = $884,234.12 State 5 8/73 $352,727.27 + $7,760,000.00 x (8/73) = $1,203,138.23 State 6 7/73 $352,727.27 + $7,760,000.00 x (7/73) = $1,096,836.86 State 7 14/73 $352,727.27 + $7,760,000.00 x (14/73) = $1,840,946.45 State 8 6/73 $352,727.27 + $7,760,000.00 x (6/73) = $990,535.49 State 9 4/73 $352,727.27 + $7,760,000.00 x (4/73) = $777,932.75 State 10 9/73 $352,727.27 + $7,760,000.00 x (9/73) = $1,309,439.6 State 11 5/73 $352,727.27 + $7,760,000.00 x (5/73) = $884,234.12 Maximum Funding Amounts. Using the example provided, the maximum amount that could be awarded to any subrecipient in FY20 is $1,250,000. Using the funding formula, the resulting FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 61 funding for State 7 exceeded the maximum amount, so State 7 would still receive $1,840,946.45. However, no subrecipient would be awarded more than $1,250,000. A state may have multiple subrecipients; if the amount of funding is not sufficient for all eligible subrecipients, the state will have to prioritize dams using their discretion, and other eligibility factors such as the subrecipient’s ability to meet the non-Federal cost share, to choose which subrecipients to fund. Example (use Table 2 above): Assume State 2 submitted five (5) activities with their application. Assume the cost estimates for each activity are as follows: $200,000 for Activity 1, $500,000 for Activity 2, $600,000 for Activity 3, $400,000 for Activity 4, and $1,000,000 for Activity 5. FEMA reviewed the five activities and determined that Activity 1 is not eligible for funding. State 2 must use the risk-based prioritization method to determine which of the remaining four eligible activities (Activities 2-5) to fund. Note that some of the activities may not be fully funded. 15. Determination of Unacceptable Risk to the Public For purposes of the HHPD, the determination of unacceptable risk to the public is to be made by the state dam safety program, the agency of the state that is authorized by state statute to manage the state participation in the NDSP. See Section H.19., Definitions, for the definitions of unacceptable risk to the public and official regulatory notice. 16. Eligible Activities FEMA will evaluate proposed activities for eligibility. Eligible activities include repair, removal, or any other structural or nonstructural measures to rehabilitate an eligible high hazard potential dam. Note that all eligible activities included in the list must also have eligible subrecipients that can meet the cost-share requirements and the other eligible subrecipient requirements. For the purposes of this grant program, the activities shown in Table 3 could qualify for funding. The activities are categorized into three types of activities: planning, design, and construction. This list is not exhaustive; other activities may also be eligible. • Planning Activities - Planning activities include investigations and risk assessments that further define the dam risk. Planning activities should include alternatives analysis to identify a preferred plan for dam rehabilitation and the estimated cost for design and construction. For project planning, the alternatives should involve the preparation of preliminary hydrologic and hydraulic modeling to address the regulations of the state and local governments for alterations in floodplain areas as well as the minimum requirements of the NFIP. The local community should be consulted during the alternative identification and selection process to address local planning, zoning, and floodplain management regulations. Potential environmental impacts should also be considered in the selection of the preferred plan. Early coordination with EHP should be conducted to address applicable environmental requirements. • Design Activities – Design activities include work to develop conceptual, preliminary, or final design plans and specifications for dam rehabilitation projects that have been planned using an alternative evaluation process that complies with NEPA requirements. Coordination with EHP during the design should be conducted to confirm that the design complies with NEPA requirements. Detailed hydrologic and hydraulic modeling should be performed for use in FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 62 designing the dam rehabilitation and to address the permit requirements of the state and local government as well as the minimum requirements of the NFIP. For all projects located in Special Flood Hazard Areas on FEMA Flood Insurance Rate Maps, a FEMA conditional review of the project design for compliance with NFIP requirements should be conducted through the process outlined in 44 C.F.R. § 65.8. The design effort should include obtaining all state, local, and federal permits for approval to construct the project in the floodplain and to meet all environmental requirements. Note that all grant-funded activities must comply with Federal Environmental Planning and Historic Preservation (EHP) regulations. See Section F.3.c., Environmental Planning and Historic Preservation (EHP) Compliance, for more information about EHP Compliance. Table 3: Examples of Eligible Scope of Work Activities Category Eligible Scope of Work Activities FPMP Requirement Y/N Staff Notes/Comments Planning • Development of evacuation plans, plans for flood fighting, or community response plans to include in the floodplain management plan • Coordination of EAP and EOPs for different release conditions N Planning • Activities and studies that determine risks associated with eligible dams • Environmental studies for NEPA compliance • Development of operation and maintenance plans N Planning • Public education and awareness of flood risks associated with the eligible dam project N Planning • Dam risk and consequence assessments Feasibility studies • Preliminary engineering studies Alternatives analysis • Mapping, engineering survey, and inundation modeling Y Design • Engineering design • Development of specifications Y Construction • Repair or rehabilitation of the dam • Dam removal • Construction monitoring • Installation of early warning systems associated with the eligible dam project Y FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 63 17. Floodplain Management Plan To be eligible for HHPD, subrecipients must have in place (or will be developed not later than 2 years after the date of execution of a dam rehabilitation or removal project agreement and implemented not later than 2 years after the date of completion of a project) a floodplain management plan to reduce the impacts of future flood events in the area impacted by the project. The floodplain management plan (FPMP) shall address: a. potential measures, practices, and policies to reduce loss of life, injuries, damage to property and facilities, public expenditures, and other adverse impacts of flooding in the area protected by the project; b. plans for flood fighting and evacuation; and c. public education risk communication targeting communities in the inundation area. The purpose of the FPMP is to specifically address the impacts of the dam or dams for which an HHPD grant has been awarded. It is intended to function as a stand-alone plan that does not modify the floodplain ordinance in effect to comply with the NFIP. The following information must be addressed in the FPMP: The development of the FPMP should be a shared responsibility of the subrecipient and local government with authority to implement policies that protect the public and regulate development. The FPMP development should include the involvement of key partners and stakeholders including representatives of the local government emergency managers, first responders and planners, state agencies including dam safety and state hazard mitigation office, as well as technical resources afforded by federal agencies such as the USACE and the NRCS. Therefore, the FPMP should include a formalized stakeholder involvement process to obtain input from key partners and stakeholders leading to adoption of the FPMP by the governing body impacted by the dam rehabilitation. The FPMP must address the following: A. Potential measures to reduce the adverse impacts of flooding 1. Evaluation of the flood hazards with and without the dam rehabilitation measures a. Identification of the reach of stream downstream and upstream of the dam for which flooding is impacted by the rehabilitation. This defines the study area as well as the local governments that should be consulted b. Identification of the impacts of the dam rehabilitation on the flood elevations for a range of frequent and infrequent flood events. i. Does the dam rehabilitation maintain or decrease the level of flood protection for the 1% flood (designed flood prevention or non-designed incidental)? ii. Does the dam rehabilitation increase the flood flows to downstream areas for a range of recurrence interval events including the 2-, 10-, 25-, 50-, 100-, and 500-year events? iii.Does the dam rehabilitation impact the operational releases form the dam during rain events? iv.For dam removal projects, the removal of the dam may increase the magnitude and timing of flood flows to downstream areas. Any adverse impacts on a range of frequent FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 64 2. What are the consequences related to the adverse impacts identified in 1 above? a. Number of residential and commercial insurable structures b. Estimated economic losses due to the flooding event c. Critical utilities d. Transportation network e. Critical facilities f. Local governmental public expenditures for operations to prepare for and recover in the event of flooding 3. What mitigation actions will be implemented by the local governments to address both the adverse impacts resulting from the dam rehabilitation (if any) such as: a. Structural modification to the stream conveyance system b. Nonstructural measures including: i. Floodproofing of structures ii. Building standards to account for increased depth or velocity 4. What mitigation actions will be implemented by the local governments to address residual risk not resolved by item 3 above: a. What actions and policies will be implemented address flood risk attributable to the adverse impacts of dam rehabilitation that could not be mitigated? b. What actions and policies that will be implemented to address residual flood risk not associated with the adverse impacts of the dam rehabilitation. c. The mitigation actions should address the planned schedule for study or implementation. B. Plan for flood fighting and evacuation A plan developed by the dam owner in cooperation with the governing local government, local government emergency managers and first responders should be prepared for flood fighting activities and evacuation for both operational releases during frequent and infrequent recurrence interval events as well as potential dam failure scenarios. 1. The plan should be consistent with the Emergency Action Plan for the dam. 2. Using the depth, velocity, and timing information of the modeling of the hydrologic and hydraulic modeling of the effects of the dam rehabilitation on downstream and upstream areas, the plan should address the locations of critical facilities, venerable population, and the transportation network. The locations of flood fighting should be identified as well as an implementation plan including responsible parties and resources (stockpile of materials or on-call contractors). 3. The plan should address the value of an early warning system. 4. The evacuation plan should address both shelter in place and horizonal evacuation. 5. The plan should address the frequency for drills and exercises of the flood fighting and evacuation plan. C. Public Education and awareness of Flood Risk FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 65 A public education and outreach program should provide information to impacted property owners and residents in and near the floodplain upstream and downstream of the dam as well as use the recreational facilities or transportation network susceptible to flooding. The plan should consider multimedia and social media measures to reach the intended audience and provide information to determine where to get information for flood hazards, flood warning, flood evacuation and how to develop their personal flood avoidance plan. The governing local government should consider evaluation of the extent of floodplains upstream and downstream of dams in the planning and zoning process for new development that may be adversely impacted by the dam. Local governments should consider including dam breach inundation mapping to subdivision plats to provide educate potential buyers of the potential flood hazard and to encourage location of building lots outside the inundation area. HHPD projects must comply with 44 CFR Part 9, which requires that actions be consistent with criteria of the National Flood Insurance Program or any more restrictive Federal, State, or local floodplain management standard. See 44 CFR 9.11(d)(6). This means that all dam rehabilitation projects must meet 44 CFR Part 65 and applicable state and local regulations for encroachment in or alterations of regulatory floodplains in compliance with state laws and local floodplain management, zoning, and site design regulations. A dam removal may result in a decrease in the regulatory flood elevations upstream of the dam and an increase in the regulatory flood elevations downstream of the dam due to loss of flood storage. For a grant that funds planning activities, alternatives should be considered for the dam rehabilitation or dam removal including performing hydrologic and hydraulic studies to determine the impact of the project on the regulatory flood elevations upstream and downstream of the dam. The local community for which the dam is located should be consulted to confirm compliance with the local floodplain management regulations and NFIP regulations. For a grant that funds design the hydrologic and hydraulic modeling should be updated to reflect the design and a review of the proposed project should be submitted to FEMA for review and issuance of a conditional letter of map revision in accordance with 44 C.F.R. §65.8 and potentially § 65.12 of the NFIP regulations. 18. Definitions Full list of definitions is available in the Rehabilitation of High Hazard Potential Dams Grant Program Guidance (FEMA, June 2020). Administrator The term “Administrator” means the Administrator of the Federal Emergency Management Agency. Board The term “Board” means a National Dam Safety Review Board established under section 467f(f) of this title. Budget Period (Source 2 C.F.R. 200.1) FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 66 Budget Period means the time interval from the start date of a funded portion of an award to the end date of that funded portion during which recipients are authorized to expend the funds awarded, including any funds carried forward or other revisions pursuant to § 200.308. Dam (Source: 33 USC § 467(3)) The term “dam”— (A) means any artificial barrier that has the ability to impound water, wastewater, or any liquid- borne material, for the purpose of storage or control of water, that— (i) is 25 feet or more in height from— (I) the natural bed of the stream channel or watercourse measured at the downstream toe of the barrier; or (II) if the barrier is not across a stream channel or watercourse, from the lowest elevation of the outside limit of the barrier; to the maximum water storage elevation; or (ii) has an impounding capacity for maximum storage elevation of 50 acre-feet or more; but (B)does not include— (i)a levee; or (ii) a barrier described in subparagraph (A) that— (I) is 6 feet or less in height regardless of storage capacity; or (II) has a storage capacity at the maximum water storage elevation that is 15 acre-feet or less regardless of height; unless the barrier, because of the location of the barrier or another physical characteristic of the barrier, is likely to pose a significant threat to human life or property if the barrier fails (as determined by the Administrator). Expected life of the dam Estimated number of years the rehabilitation will be effective. The expected life for a dam rehabilitated under the HHPD program is 50 years. FEMA The term “FEMA” means the Federal Emergency Management Agency. Period of Performance (POP) (Source 2 C.F.R. 200.1) Period of performance means the total estimated time interval between the start of an initial Federal award and the planned end date, which may include one or more funded portions, or budget periods. Identification of the period of performance in the Federal award per § 200.211(b)(5) does not commit the awarding agency to fund the award beyond the currently approved budget period. Program The term “Program” means the national dam safety program established under section 467f of this title. Subrecipient A non-federal entity that receives a subaward from a pass-through entity to carry out part of a federal program; but does not include an individual that is a beneficiary of such program. A subrecipient may also be a recipient of other federal awards directly from a federal awarding agency. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 67 The term “eligible subrecipient”, in the case of a project receiving assistance through the HHPD program, includes— (A) a governmental organization; and (B) a nonprofit organization 19. Appendices Appendix A: FY24 Performance Measure Targets Objective Eligible Activities - Examples Performance Measures FY24 Target Unit Reduce or eliminate risk of eligible high hazard potential dam (HHPD) 1.1 Planning tasks and activities, studies and analysis for pre- construction phases, scoping activities, and permit applications. 1.1 Number of eligible HHPD dams that have resulted in the completion of studies and analysis for pre- construction phases, scoping activities, and permit applications. Total number 1.2 Preliminary and 1.2 Number of eligible Total number final design package HHPD dams that have and required permit resulted in the approvals. completion of preliminary and final engineering design package and permits. 1.3 Construction 1.3 Number of eligible Total number activities that support HHPD dams that result dam rehabilitation or in construction projects removal projects. for dam rehabilitation or removal. FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 68 Appendix B: Performance Progress Report (PPR) APPENDIX B1: PERFORMANCE PROGRESS REPORT (PPR) TEMPLATE: PART 1 SUMMARY SHEET PPR Templates are available through your Regional Program Office FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top 69 APPENDIX B2: PERFORMANCE PROGRESS REPORT (PPR) TEMPLATE: PART 2 PERFORMANCE METRICS TARGETS PPR Templates are available through your Regional Program Officer FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. PROCUREMENT - AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 17, 2024 ITEM TITLE: Title: Engineering Services for Pickleball / Tennis Courts & Parking at South Cove County Park Department(s): PRT Amount: $68,500.00 Contingency (10%): $ 6,850.00 Total: $75,350.00 FINANCIAL IMPACT: Procurement was approved by Council in Fiscal Year 2024-2025 budget process. Budget: $75,350.00 Project Cost: $75,350.00 Balance: $0.00 Finance Approval: BACKGROUND DESCRIPTION: At the June 1, 2022 meeting, Council approved the award of RFP 20-02 for On Call Engineering Services to Thomas & Hutton of Greenville, SC for Category E: On Call General Engineering Services. Parks, Recreation, and Tourism wishes to contract with Thomas & Hutton to provide engineering services for the expansion of the pickleball courts, two new tennis courts, two new parking lots, site plans for new restroom facilities including a septic system, and enhanced lighting. South Cove County Park has experienced a remarkable increase in pickleball usage, with the courts reaching full capacity multiple times daily, seven days a week. This high demand has led to wait times for other patrons. Currently, the pickleball and tennis courts are in the same area, and there is insufficient parking, with patrons resorting to parking on the grass across from the courts. The proposed expansion will add approximately 12 pickleball courts and 2 tennis courts and approximately 108 parking spaces. The scope of engineering services includes surveying, site design, master planning, permitting, bidding and award, construction administration, and project closeout. This project has received approval through Duke Energy and the Federal Energy Regulatory Commission (FERC). ATTACHMENT(S): 1. Thomas and Hutton Proposal STAFF RECOMMENDATION: It is the staff’s recommendation that Council: 1. Approve Engineering Services for the South Cove Pickleball / Tennis Court Expansion, to Thomas and Hutton of Greenville, SC in the amount of $68,500.00 2. Approve at 10% contingency in the amount of $6,850.00 Submitted or Prepared by: ___________________________________ Approved for Submittal to Council: __________________________________ Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. PROCUREMENT - AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 17, 2024 ITEM TITLE: Title: Six (6) Fire Apparatuses with Loose Equipment Department(s): Emergency Services Amount: $3,302,535.00 FINANCIAL IMPACT: Procurement was approved by Council in Final Reading of Ordinance 2024-20 as a separate Agenda Item. Budget: $3,302,535.00 Project Cost: $3,302,535.00 Balance: $0.00 Finance Approval: ________________________________ Funding per Ordinance 2024-20 1st Reading: August 20, 2024 - Approved 4-0 2nd Reading: September 3, 2024 - Approved 5-0 3rd Reading: September 17, 2024 - Previous item on this September 17, 2024 Meeting Agenda BACKGROUND DESCRIPTION: These Fire Apparatuses are FES single -axle pumper/ tankers mounted on Freightli ner M2 112 chassis. These units feature 3/16" all -aluminum bodies and are equipped with 2,000-gallon polypropylene tanks. They are outfitted with Hale MDP side-mount 1,000 GPM pumps with dump tanks, attack hoses, supply hoses, and additional loose equipment. Designed for rapid water discharge from three sides, these units feature user-friendly controls both inside the cab and on the side of the body. These apparatuses will be constructed in compliance with NFPA (National Fire Protection Association) standards. The advanced pump and attack hose setup is tailored to enhance the operational flexibility for volunteer fire departments, enabling them to initiate fire suppression efforts prior to the arrival of dedicated attack f ire engines. Given the extensive ar eas of Oconee County lacking fire hydrants, the capacity to transport substantial quantities of water is essential. These new tankers will enhance operational capabilities alongside the existing tankers in the county’s inventory. The new apparatus es will be stationed at Keowee Ebenezer, Friendship, West Uni on, Holly Springs, Oakway, and Cleveland Volunteer Fire Departments. The current tankers stationed at these locations will be reassigned to other stations across Oconee County that currently lack tanker support. Additionally, some of these stations are using older 1,000-gallon pumpers as tankers, and units that have reached the end of their service life will be retired and sold as surplus. The County is utilizing the North Carolina Sheriffs Association contract through a cooperative purchasing agreement. The contract discount is 6.7% off the MSRP of the apparatus and 6% off the MSRP price of options. Safe Industries is offering a 16.9% discount. The Fleet Maintenance Director also approves this purchase. SPECIAL CONSIDERATIONS OR CONCERNS: Safe Industries of Easley, SC holds the North Carolina Sheriffs’ Association contract for FES Commercial, Single Axle Tankers, contract number 25-05-0521 / FES25-05. The North Carolina Sheriff’s Association contract allows all County and City Government Agencies to purchase, from this contract, directly from the awarded vendors. ATTACHMENT(S): 1. Pricing Summary spreadsheet for Six (6) Tankers 2. Safe Industries Proposal 3. Pricing Summary – Single Axel Tankers Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. 4. Safe Industries Loose Equipment Proposal 5. Pricing Summary – Loose Equipment 6. Single Axel Tanker Specification 7. Single Axel Tanker Drawing 8. NC Sheriffs Association Contract Information, Contract # 25-05-0521 / FES24-05. STAFF RECOMMENDATION: It is the staff’s recommendation that Council; 1. Approve the purchase of Six (6) Commercial Single Axle Tankers to Safe Industries of Easley, SC in the amount of $3,302,535.00. 2. Authorize the County Administrator to execute documents for this this purchase. Submitted or Prepared By:_______________________________Approved for Submittal to Council: ___________________________________ Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator Quantity Description Unit Cost Extended 6 Single Axle Fire Apparatus Total for 6 trucks at $518,283.00 is $3,109,698.00 difference in proposed amount and calulation is $5.00 which resulted from Vendor Rounding $518,283.00 $3,109,695.00 6 Loose Equipment Packages $41,640.00 $249,840.00 6 Tax (IFM Fee) $500.00 $3,000.00 $3,362,535.00 6 Discount for Paying $131,000.00 for each Chasis on Receipt and Approval by FEX -$5,000.00 -$30,000.00 6 Mulitiple Unit Discount for four (4) or more Tankers -$5,000.00 -$30,000.00 Grand Total for 6 Tankers with Loose Equipment $3,302,535.00 Pricing Breakdown Spreadsheet Six Fire Apparatuses with Loose Equipment OCONEE COUNTY 2K TANKER Single Axle Tanker Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05. PART NO DESCRIPTION LIST PRICE == Single Axle Tanker - 0.000 == -$ A0-00-0025 FES Standard Shipping Charges - Pumper/Tanker 7,750$ A0-00-0050 FES Standard Engineering Charges - Pumper/Tanker 1,550$ A0-00-0150 *** Proposed - Tanker Spec Boilerplate *** -$ AA-00-0007 Proposed by - Safe - Marler -$ AA-00-0200 Proposed - General Information - NFPA 1900 98$ AA-00-0265 Proposed - Completion Info 98$ AA-00-0300 Proposed - FMVSS Certification -$ AA-00-0320 Proposed - Records -$ AA-00-0440 Proposed - General Construction -$ AA-00-0510 Proposed - Single Line Responsibility - Apparatus Body -$ AA-00-0520 Proposed - Product Liability -$ AA-00-0740 Proposed - Paint Performance Certification -$ AA-00-0930 Proposed - Service Center and Parts Availability -$ AA-00-0950 Proposed Service By - Safe Industries -$ AA-00-1040 Proposed - Prices & Payments - FOB FES -$ AA-00-1210 Proposed - Delivery TIme - Chassis Receipt -$ AA-00-1720 Proposed - Fair, Ethical, and Legal Competition -$ AA-00-1740 Proposed - Non-Collusion Agreement -$ AA-00-2130 Proposed - Material and Workmanship -$ AA-00-2300 Proposed - Sales Engineer -$ AA-00-2550 Proposed - Drawing Submitted with Bid - Tanker 4,647$ AA-00-3840 Proposed - Apparatus Delivery - Customer Pick Up -$ AA-00-4340 Proposed - Instructional Manuals 1,180$ AA-00-4540 Proposed - Vehicle Fluids Plate 218$ AA-00-5850 Proposed - Location of Manufacturing Facility -$ AA-00-6140 Proposed - FAMA Membership -$ AA-00-6230 Proposed - Safe SC Dealer's License -$ AA-00-6545 Proposed - Manufactured in the US -$ AA-00-6970 Proposed - Cooperative Purchasing -$ AA-00-7305 Proposed - 3rd Party Testing -$ AA-00-9000 Proposed - Full Time Service and Warranty Staff -$ AB-00-0815 Mobile Water Supply Fire Apparatus NFPA 2016 Chapters of Compliance -$ AB-00-0930 Vehicle Data Plate Description 217$ AB-00-0945 Proposed Principal Apparatus Dimensions & GVWR -$ AB-00-1010 Critical Overall Height Requirement - No -$ AB-00-1020 Critical Overall Length Requirement - No -$ AD-10-0005 Freightliner Chassis 2DR SA 201,884$ AE-14-0050 Seat Belt Clarification for NFPA -$ AE-14-6320 Stainless Steel Wheel Trim Kits - SA 711$ AE-14-6500 Cab Steps - 2 DR -$ AE-14-6555 FES Custom Fabricated Driver Side Treadplate Cab Step - 2 DR 4,522$ AE-14-6560 FES Custom Fabricated Officer Side Treadplate Cab - 2 DR 2,602$ AE-14-6620 Cab Step Lights- 2 Door 625$ AE-14-7880 Center Console for 2 Door - Brushed 2,106$ AE-14-8480 Install Standard #MATM Antenna 1,001$ AE-14-9025 Tire Pressure Monitoring - LED Valve Stem Caps 6 Tires 189$ AH-02-0000 SA Dryside Tanker - 1250 - 2000 Gallons -$ AH-03-9100 3M Reflective Material - Cab 2 Door - Red/White 282$ AH-04-0000 ***Header - Front Bumper Accessories *** -$ AH-04-0008 Standard Front Bumper Provided by the Chassis Manufacturer -$ AH-04-0655 Two (2) Tow Hooks Provided by the Chassis Manufacturer -$ AJ-00-0025 *** Header - Chassis Electrical, 2DR*** -$ AJ-00-0040 *** Header - Body Electrical - Options *** -$ AJ-01-0005 Electrical System Description -$ AJ-01-0015 12 Volt Electrical System Testing - All Units 480$ AJ-01-0100 Class One Load Management System 4,400$ AJ-01-0200 Class One Voltage Monitoring System - 12 Volt 1,368$ AJ-01-0230 Electrical Harness Installation - 12 Volt 3,095$ AJ-01-0610 Kussmaul Super Auto Eject 20 - 091-55-20-120 845$ AJ-01-0660 Kussmaul Water Proof Super Auto Eject Cover - Red - 091-55RD 236$ Singe Axle Tanker Pricing Sheet Page 1 of 8 OCONEE COUNTY 2K TANKER Single Axle Tanker Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05. PART NO DESCRIPTION LIST PRICE AJ-01-1105 Shoreline Receptacle Label NFPA 350$ AJ-01-1120 Shoreline Location - DS Step Well -$ AJ-01-1320 Kussmaul Charger with Integrated Display 091-266-12-40 1,715$ AJ-01-1860 Kussmaul Auto Pump 12 V 100PSI - 091-9-12V 1,357$ AJ-01-1900 Kussmaul Auto Pump Timer 091-150 550$ AJ-01-1910 Kussmaul Auto Drain For 12V Pump 091-9-131 350$ AJ-02-0033 Switch Console Six (6) Switches 726$ AJ-02-0099 Control Switching Labeling 119$ AJ-02-0350 Door Open Indicator w/ Integral Audible Alarm 277$ AJ-05-0000 *** Header - 12V Power/USB Charging /Power - Ground Circuits*** -$ AJ-05-0208 Blue Sea Fuse Block - 6 Circuit in Center Console 849$ AJ-10-0000 ***Header - Camera Systems *** -$ AJ-10-0315 FRC inView TrueSight Wired - 2 Cam for Dumps, 1 for Rev, 1 Monitor 2,319$ AJ-10-0975 Monitor Mounted in Center Console 296$ AJ-17-0005 Body Electrical System 11,520$ AJ-20-0005 Chassis Marker Lights and Reflectors -$ AJ-20-0025 Marker/Turn Lights at Each Side of Body 590$ AJ-20-0030 Marker/Turn Lights at Rear of Body 507$ AJ-20-0098 Delete License Plate Light at Rear of Body -$ AJ-20-1010 Whelen M6 Stop/Tail/Turn/Back Up Lights W/ Clear Lens in Quad Housing 1,999$ AJ-25-0115 Body Step Lights TecNiq EON-3 LED 610$ AJ-26-0000 *** Header - Hose Bed Lighting *** -$ AJ-26-0035 Hose Bed Light - Front Hose Bed Wall - TecNiq E41 LED 587$ AJ-26-0080 Hose bed Light Switch - Rear Body Panel 330$ AJ-26-0300 Pump Enclosure Work Lights - TecNiq E18 409$ AJ-28-0000 *** Header - Body Scene Lights *** -$ AJ-30-0560 FireTech HiViz Surface Mount Scene Lights - Guardian Elite Rear of Body 2,211$ AJ-30-0570 FireTech HiViz Surface Mount Scene Lights - Guardian Elite Driver Side of Body 2,211$ AJ-30-0575 FireTech HiViz Surface Mount Scene Lights - Guardian Elite Officer Side of Body 2,211$ AJ-32-0015 Control Switch on Pump Panel for Rear of Body Scene Lights 226$ AJ-32-0020 Control Switch in Cab for Rear of Body Scene Lights 226$ AJ-32-0410 Control Switch in Cab for Driver Side of Body Scene Lights 226$ AJ-32-0420 Control Switch on Pump Panel for Driver Side of Body Scene Lights 226$ AJ-32-0510 Control Switch in Cab for Officer Side of Body Scene Lights 226$ AJ-32-0520 Control Switch on Pump Panel for Officer Side of Body Scene Lights 226$ AJ-32-1005 Scene Lights Activated by Reverse 226$ AK-00-0000 *** Header - Brow Lighting *** -$ AK-00-0250 HiViz FireTech - (1) 46" Brow Light - 180W12V LED - Above Windshield 2,328$ AK-05-0015 Control Switches in Cab for Lights Above Windshield - HiVIZ 225$ AK-05-0040 Wire Upgrade for 12V High Amp Light - (1) Brow Light 121$ AM-03-0000 NFPA (2) Ground Lights - TecNiq #E10-WS00-1 LED Below Cab Doors 423$ AM-03-0020 Ground Lights (2) Below Pump Panel Running Board - TecNiq LED E10-WS00-1 423$ AM-03-0033 Ground Lights (2) Below Side Dumps - TecNiq LED E10-WS00-1 423$ AM-03-0038 Ground Lights (2) Below Tailboard - TecNiq LED E10-WS00-1 423$ AM-15-0000 Cab and Body Ground Lights Activate by Engaging Parking Brake 127$ AM-35-0000 ***Header - 12V Body Flood Lighting*** -$ AP-00-0000 *** Header - Compartment Lighting*** -$ AP-05-0005 Compartment Light Activation - Roll Up Doors 212$ AP-10-0400 ROM DuroStrip LED Compartments Lights -$ AP-10-0453 Compt. Lights 30" ROM DuroStrip White LED Track Lighting - Dual - Update QTY!! -$ BA-00-0005 *** NFPA Warning Light Package *** -$ BB-00-0000 NFPA Compliant Warning Light Package - All Units -$ BB-00-0010 Light Package Actuation/ Controls - All Units -$ BB-00-0015 Warning Lights Flash Pattern - NFPA -$ BB-10-0000 Whelen Upper Warning Package - Pumpers & Tankers -$ BC-01-0055 A- Upper Whelen LED F4N2QLED Freedom Series IV 55" Light Bar Front Populated 4,713$ BC-05-0138 C-Upper Whelen M9RC Super LED 1,116$ BC-07-0038 B/D - Upper Rear Whelen M9RC Super LED Series 1,116$ BC-08-0038 B/D - Upper Front Whelen M9RC Super LED Series 1,116$ BD-00-0001 Whelen Lower Warning Package - Pumpers & Tankers -$ BD-01-0035 A-Lower Front Whelen M6RC Super LED 884$ Singe Axle Tanker Pricing Sheet Page 2 of 8 OCONEE COUNTY 2K TANKER Single Axle Tanker Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05. PART NO DESCRIPTION LIST PRICE BD-02-0001 A-Lower Front Mounting - Chassis Grille -$ BD-10-0040 C-Lower Rear Whelen M6RC Super LED 884$ BD-15-0073 B/D - Lower Front Whelen M6RC Super LED 884$ BD-15-9000 B/D - Lower Front Mounting - Chassis Hood -$ BD-20-0105 B/D - Lower Mid - Whelen M6RC Super LED 884$ BD-27-0105 B/D - Lower Rear - Whelen M6RC Super LED 884$ BD-80-0000 Light Package NFPA Certification - All Units -$ BG-00-0000 *** Header - Optional Warning Lights *** -$ BK-05-0000 Whelen LED Traffic Advisor TAL65 36" - Light at Rear of Body 1,162$ BK-09-0005 Traffic Advisor - Recess Mounting on Rear Sheet 115$ CA-00-0003 *** Header - Audible Warning Equipment*** -$ CA-01-0050 Back Up Alarm - 97 dB(A) 292$ CA-02-0000 -$ CA-11-0003 Air Horn Control - DS Foot Swtich & OS Clamshell on Cab Dash 584$ CB-00-0010 Siren - Whelen #295SLSA1, 100W 988$ CB-05-0200 One (1) Whelen SP123BMC Speaker - Driver Side of Front Bumper 545$ DM-04-0000 *** Tankers *** -$ DN-03-0210 Hale MBP-100 1000 GPM Pump - PTO - 6" Inlets Required 31,931$ FC-06-0025 PTO Pump Shift Indicator Lights 370$ FD-00-0500 Aux GearboxCooler - REQ Pump Power Req >200Hp or MBP = 1000 GPM - DBack BOA 361$ FG-00-0000 *** Header - Pressure Relief Valves *** -$ FG-45-0038 Class One "Sentry" Pressure Governor Control "SPG" with Twister 3,385$ FG-50-0000 Class One Stainless Steel Intake Relief Valve -$ FH-00-0000 *** Header - Hale Pump Priming Pump and Controls *** -$ FH-02-0200 Trident "Manual" 2 Barrel Air Pump Priming System - Hale Direct Mount </1000 GPM 1,700$ FI-00-0001 *** Header - Drains & Accessories *** -$ FI-00-0020 12 Port Rotary Master Drain Valve 188$ FI-00-0040 Drains/Bleeder Lift Up at all 1-1/2" or Larger -$ FI-00-0080 Synflex Suction, Discharge, Pressure and Control Lines 384$ FI-00-0118 Alloy Anodes Three (3) Total 787$ FI-00-0900 Delete Thermal Relief Valve -$ FN-00-0015 Side Mount Pump Module 5,990$ FN-00-1030 Pump Module Aluminum Construction -$ FN-00-1130 Delete Dunnage Area -$ FO-00-0010 *** Header - Pump Suctions *** -$ FP-00-0028 Hale Suction Inlets 6" NST 192$ FP-23-5008 Short Neck Main Pump Suction Inlets - DS & OS -$ FP-23-5042 6" NST Main Pump Suction Pressure Vented Cap (2) 639$ FP-33-0040 *** Header - Auxiliary Suction *** -$ FP-35-6220 2 1/2" AUX Suction @ DS Panel to Front of Main Inlet 192$ FP-35-6233 2 1/2" Akron #8800 S.S. Ball Valve - DS Front AUX Suction 96$ FP-35-6240 Swing Control @ Valve DS Front Aux Suction 1,260$ FP-35-6420 2 1/2" AUX Suction @ OS Panel to Front of Main Inlet 192$ FP-35-6433 2 1/2" Akron #8800 S.S. Ball Valve - OS Front AUX Suction 96$ FP-35-6440 Swing Control @ Valve OS Front Aux Suction 1,260$ FP-50-0020 *** Side Mount - Tank to Pump *** -$ FP-51-0005 Tank to Pump - 3" Valve -$ FP-53-0000 3" Akron #8800 Series S.S. Ball Tank to Pump - Push/Pull 1,255$ FP-65-0000 *** Header - Tank Fill *** -$ FP-65-0450 2" Tank Fill Line from Pump -$ FP-65-0600 2" Akron #8800 Series S.S. Ball Tank Fill Push Pull 976$ FS-05-0000 *** Header - Driver's Side #1 Main Discharge *** -$ FS-05-0005 DS Main Discharge #1 -$ FS-05-0300 2 1/2" Akron #8825 - SS Ball DS #1- Push Pull 1,238$ FS-05-0553 DS Discharge #1 - 2 1/2" Straight NST & 30 DEG NST Elbows 370$ FS-05-0600 2 1/2" NST Pressure Vented Cap - DS Discharge #1 88$ FS-07-0003 Delete DS Main Pump Discharge #2 -$ FS-13-0000 *** Header - Officer's Side #1 Main Discharge *** -$ FS-13-0010 OS Main Discharge #1 -$ FS-13-0300 2 1/2" Akron #8800 Series - S.S. Ball OS #1 - Push Pull 1,254$ FS-13-0553 OS Discharge #1 - 2 1/2" Straight NST & 30 DEG NST Elbow 370$ Singe Axle Tanker Pricing Sheet Page 3 of 8 OCONEE COUNTY 2K TANKER Single Axle Tanker Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05. PART NO DESCRIPTION LIST PRICE FS-13-0600 2 1/2" NST Pressure Vented Cap - OS Discharge #1 88$ FS-15-0000 *** Header - Officer's Side #2 Main Discharge *** -$ FS-15-0010 OS Main Discharge #2 -$ FS-15-0300 2 1/2" Akron #8800 Series - S.S. Ball OS #2- Push Pull 1,254$ FS-15-0553 OS Discharge #2 - 2 1/2" Straight NST & 30 DEG NST Elbow 370$ FS-15-0600 2 1/2" NST Pressure Vented Cap - OS Discharge #2 88$ FS-42-5050 *** Header - Front Discharge #1 *** -$ FS-43-0060 Front Bumper Discharge #1 - 2-1/2" 576$ FS-43-0435 2 1/2" NST Straight Adapter Thru OS of Front of Bumper Discharge #1 144$ FS-43-0560 Front Discharge #1 Plumbing 2 1/2" Stainless Steel Piping 1,641$ FS-43-0660 2 1/2" Akron #8800 Series S.S. Ball Valve Front Discharge #1 - Push 1,302$ FS-43-0810 2-1/2" NST Front Discharge #1 Pressure Vented Cap 88$ FS-50-0100 *** Header - Crosslay Discharge #1 *** -$ FS-50-0110 Crosslay #1 - 1-1/2" -$ FS-50-0400 Crosslay #1 - 200' of 1 3/4" 768$ FS-50-0430 Crosslay #1 - Double Stack Hose Design 192$ FS-50-0500 1 1/2" NST Chicksan Swivel - Crosslay #1 Discharge 262$ FS-50-0600 Crosslay #1 Plumbing - 2" Stainless Steel Piping 860$ FS-50-0700 2" Akron #8800 Series - S.S. Ball Valve Crosslay #1 - Push Pull 1,103$ FS-53-0000 *** Header - Crosslay Discharge #2 *** -$ FS-53-0010 Crosslay #2 - 1-1/2" -$ FS-53-0400 Crosslay #2 - 200' of 1 3/4" 768$ FS-53-0430 Crosslay #2 - Double Stack Hose Design 192$ FS-53-0500 1-1/2" NST Chicksan Swivel - Crosslay #2 262$ FS-53-0600 Crosslay #2 Plumbing - 2" Stainless Steel Piping 860$ FS-53-0700 2" Akron #8800 Series - S.S. Ball Valve Crosslay #2 - Push Pull 1,103$ FS-65-0005 *** Header - Crosslay/ Speedlay Options *** -$ FS-65-0103 Deadlay Hose Storage Above Pump, 200' of 3" Hose 768$ FS-65-0315 Vinyl Crosslays Cover 1,150$ FS-65-0350 Crosslays Cover - Red -$ FV-00-0010 *** Header - Foam Systems*** -$ GA-00-0000 *** Header - Pump Panel Accessories *** -$ GA-00-0015 Side Mount Pump Panel 8,640$ GA-00-0840 Side Mount Panels - All Pro Linings - Black 1,064$ GA-00-1090 Discharge Gauge Trim Bezels 40$ GA-00-2000 Identification Plates 43$ GA-01-1225 Pump Operators Panel Light Shield 317$ GA-01-1320 TecNiq #E18 LED Lights - Light Shield 439$ GA-02-0315 OS Pump Panel Light Shield 317$ GA-02-0380 TecNiq #E18 LED Strip Lights - Light Shield 439$ GA-02-0381 Microphone Box w/ Integral Speaker Grille 539$ GG-00-0020 *** Pump Operators Panel - Pumper *** -$ GG-01-0000 Class One Twister Throttle Control 998$ GG-01-0025 Air Horn Control Button on Pump Panel 379$ GG-01-0155 Class One "SPG" Pressure Governor Control @ Panel - Portrait Layout 192$ GG-01-0180 Pump Pressure & Vacuum Test Ports @ Panel 209$ GG-01-0205 Master Pressure & Compound Gauges -$ GG-01-8930 Engine Cooler Vavle 378$ GG-05-0023 6" Class One Master Pressure and Compound Gauges 597$ GG-05-0140 Pressure & Compound Gauge Ranges - Single Stage -$ GG-06-0000 Pressure Gauges -$ GG-06-0050 Class One Liquid Filled - 2 1/2" Press Gauge **Update QTY!!** 1,140$ GG-10-0010 ***Water Tank Level Gauge*** -$ GG-10-0230 Class One "ITL" 40 Light Tank Level Gauge 768$ GG-10-0260 Class One "ITL-40" Multi-Color LED's 704$ GG-10-0715 Class One Water Level - 1/4" NPT Press Transducer @ Bottom of Tank 321$ GG-10-0760 Monster Light Option -$ GG-10-0910 Monster Water Level Gauge, Rear of Body - Whelen PSTANK2 1,131$ GG-40-0000 *** Poly-Tank - Pumpers and Dryside Tankers - Non Painted Tank *** -$ GG-40-0100 Tank 2000 Poly-Tank 23,655$ GG-40-0500 Water Tank Construction Poly -$ Singe Axle Tanker Pricing Sheet Page 4 of 8 OCONEE COUNTY 2K TANKER Single Axle Tanker Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05. PART NO DESCRIPTION LIST PRICE GG-40-0510 Water Tank Lid Poly -$ GG-40-0515 Standard Fill With Diverter - All Tanks 138$ GG-40-0518 Mounting Block Assembly and Tank Mounting Kit 1,145$ GG-40-0525 Water Tank Fill Tower Poly (Tank Capacity 1500-2000) 12" x 24" -$ GG-40-0550 Anti-Surge Tower - All Tanks 293$ GG-40-0563 Water Tank 6" Overflow & Vent Pipe 553$ GG-40-0600 Water Tank Sump -$ GG-40-0620 Water Tank 3" Sump Drain -$ GG-40-0750 Water Tank Outlets - Pumper -$ GG-40-0775 Water Tank Mounting All "T" Tanks -$ GG-58-0103 Water Tank Sump for Rear Dump Connection 336$ GG-58-0110 Water Tank Rear Dump - T Tanks -$ GG-58-0250 Water Tank Behind Axle Dump -$ GG-60-0005 Tank Modification for Rear Square Dump 632$ GG-60-0035 10" Square Newton Dump, Electronically Operated - Rear - Tank 5,200$ GG-60-0400 Rear 18" Square Newton Electric Chute, No Cover 4,518$ GG-60-0510 Rear Dump Switching - Driver & Officer Side Rear Body Cast Housing 853$ GG-60-0520 Rear Dump Switching - In Cab Non Multiplexed 469$ GG-60-0750 Rear Chute Switching - Driver & Officer Side Rear Body Cast Products Housing 853$ GG-60-0761 Rear Chute Switching - In Cab Non Multiplexed 469$ GG-60-0810 Three (3) Dump -$ GG-60-0830 Dump Master Power Switch in Cab 192$ GG-65-0003 Water Tank Sump for Driver Side Dump Connection 336$ GG-65-0005 Tank Modification for Driver Side Square Dump 398$ GG-65-0015 10" Square Newton Dump, Electrically Operated -Driver Side 5,200$ GG-65-0440 18" Square Newton Electric Chute, SS Cover - Driver 5,166$ GG-65-0505 Driver Dump Switching - in Cab Non Multiplexed 469$ GG-65-0585 Driver Chute Switching - In Cab Non Multiplexed 469$ GG-65-0800 Driver Dump Switching - Driver Side Rear Body Cast Products Housing 449$ GG-65-0810 Driver Chute Switching - Driver Side Rear Body Cast Products Housing 449$ GG-68-0003 Water Tank Sump for Officer Side Dump Connection 336$ GG-68-0005 Tank Modification for Officer Side Square Dump 398$ GG-68-0015 10" Square Newton Dump, Electrically Operated -Officer Side 5,200$ GG-68-0335 18" Square Newton Electric Chute, SS Cover - Officer 5,166$ GG-68-0505 Officer Dump Switching - in Cab Non Multiplexed 469$ GG-68-0585 Officer Chute Switching - In Cab Non Multiplexed 469$ GG-68-0800 Officer Dump Switching - Officer Side Rear Body Cast Products Housing 449$ GG-68-0810 Officer Chute Switching - Officer Side Rear Body Cast Products Housing 449$ GG-70-0010 Tank Modification for Dual Direct Tank Fill 1,252$ GG-70-0050 Driver & Officer's Side Rear Direct Tank Fill -$ GG-70-0115 Direct Tank Fill DS Rear 3" Akron 2-1/2" NST Fitting 2,025$ GG-70-0165 Direct Tank Fill OS Rear 3" Akron 2-1/2" NST Fitting 2,025$ HA-02-0010 Apparatus Body General Description (Tanker) -$ HA-03-0373 3/16" Aluminum Body 66,354$ HA-08-0000 Subframe for Aluminum Bodies -$ HB-35-0560 SA 165 - Tanker - Rollup Doors - BAD (2000 MAX) -$ HB-36-4200 SA Tanker FB- 165- R - DS Low Side - BAD 1,667$ HB-36-4300 SA Tanker FB- 165 - R - OS Low Side - BAD 1,667$ JA-00-0015 *** Header - Dryside Tanker Body Options *** -$ JA-01-0040 Rollup Doors on All Compartments, Any Compatible Body -$ JA-01-0135 ROM Rollup Doors, Painted Finish - QTY 930$ JA-01-0200 5-Wire MDAS (Door Ajar Switch) - ROM 273$ JA-01-0300 Painted Top Gutter And Side Frames -$ JA-01-0700 Sweep Out Compartments -$ JA-10-0110 Compartment Tops - Tankers 2,695$ JA-10-0150 Drip Molding 1,462$ JA-10-0200 Coated Fasteners -$ JA-10-0205 Compartment Louvers 7$ JA-10-0220 Access Panels -$ JA-10-0305 Tread Plate Overlay, Front of Side Compt. (Wrap Around) 1,735$ JA-15-0010 Rear Body Panel Description 1,020$ Singe Axle Tanker Pricing Sheet Page 5 of 8 OCONEE COUNTY 2K TANKER Single Axle Tanker Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05. PART NO DESCRIPTION LIST PRICE JA-15-0030 Delete Rear Light Stanchions, Body Mount Warning Lights -$ JA-15-0105 Body Rub Rails Tread Plate 991$ JA-15-0600 Running Board Steps - Delete on Side Kick Pump 1,462$ JA-29-0080 Rear Step - 8" D x 100" W - Tapered Ends 1,569$ JA-31-0010 Delete Intermediate Rear Step -$ JA-35-0520 Rear Step Compartments - Tanker 1,470$ JA-35-1900 Hose Box Storage on Rear Tailboard - 50' of 3" DJ Hose - Chevron Finish 908$ JB-00-0000 *** Header - Handrail Description & Options *** -$ JB-01-0000 Grab Rails, Knurled Aluminum Extrusion -$ JB-01-0050 Handrail Finish - Clear -$ JB-01-0495 Grab Rail Locations -$ JB-01-0505 Two (2) Vertical Rails on Rear 666$ JB-01-0510 One (1) Handrail Below Hose Bed Level 462$ JB-01-0520 Two (2) 18" Horizontal Handrails Rear Top of Body 493$ JB-01-0530 Handrails Front of Body Each Side 493$ JB-03-0403 Innovative Controls Lighted Folding Step(s), Body Front DS 818$ JB-03-0453 Innovative Controls Lighted Folding Step(s), Body Front OS 818$ JB-03-0505 Innovative Controls Lighted Folding Step(s), Body Rear DS 1,636$ JB-03-0605 Innovative Controls Lighted Folding Step(s), Body Rear OS 1,636$ JB-05-0000 Safety Signs (NFPA Required) -$ JB-05-0010 Aluminum Wheel Well Liners - SA 2,327$ JB-05-0018 Polished Stainless Steel Fenderettes, Single Axle Body 575$ JC-00-0005 *** Header - Fender Options *** -$ JC-00-0500 Driver Front Fender - SCBA Air Pack Storage 1,795$ JC-00-0505 Nylon Strap for SCBA Cylinder(s) 155$ JC-00-0530 Driver Rear Fender - SCBA Air Pack Storage 1,795$ JC-00-0535 Nylon Strap for SCBA Cylinder(s) 155$ JC-00-0540 Officer Front Fender - SCBA Air Pack Storage 1,795$ JC-00-0545 Nylon Strap for SCBA Cylinder(s) 155$ JC-00-0550 Officer Rear Fender - SCBA Air Pack Storage 1,795$ JC-00-0555 Nylon Strap for SCBA Cylinder(s) 155$ JC-00-0900 Fender Storage Compartments - Painted Doors - Update QTY of Doors!! 3,816$ JC-00-0950 Fender Storage Compartment Interior - DA Sanded 1,038$ JC-00-1010 Rear Mud Flaps 155$ JC-00-1020 Painted Rear Tow Eyes, Through Rear Sheet 1,019$ JC-01-0005 Hose Bed, Tankers 768$ JC-01-0410 Fiberglass Hose Bed Flooring, Tankers 2,625$ JC-01-0500 One (1) - 3/16" Adjustable Hose Bed Partition 942$ JD-00-0010 Hose Bed Cover - Vinyl With Velcro - Update Shop Note with Color 1,984$ KD-00-0000 *** Header - Port-A-Tank Storage *** -$ KD-00-0006 Vertical Port-A-Tank Storage Beside Water Tank - Driver Side 1,536$ KD-00-0113 Rollers for Tank Storage 1,013$ KD-00-0183 Port-A-Tank Storage Access Door - Finished W/ Smooth Aluminum with Chevron 1,081$ KD-06-0001 *** Ladder Storage Options *** -$ KD-06-0007 Cast Aluminum Ladder Mounting Brackets - Officer Side 533$ KH-00-0025 Duo-Safety Ladder Compliment -$ KH-01-0075 Duo-Safety 900-A, 24', Aluminum, 2 Section Extension Ladder 1,083$ KH-01-0130 Duo-Safety 775-A, 14', Aluminum, Roof Ladder w/ Folding Hooks 501$ KH-01-0710 Duo-Safety 585-A, 10', Folding, Aluminum, Attic Ladder 366$ KL-00-0000 *** Header - Pike Poles *** -$ KL-01-0005 Pike Poles Tube (s) - Compartment Caps - **Select Location** -$ KL-01-1005 Location Pike Poles Tube (s) - OS Compartment Cap - **Update QTY!!** 785$ KL-05-0000 *** Header - Suction Hose Storage**** -$ KL-05-0450 Suction Hose Storage - Side of Body Trays - 1-Driver & 1-Officer 1,209$ KL-05-1440 Two (2) 10' Sections of 6" Kochek Lightweight Suction Hose NHLHF x NHRLM 1,947$ KL-05-1604 Safety Note for PVC Suction Hose -$ KL-05-1900 Additional Items Shipped with Vehicle, All Non Aerials -$ 1 TRUCK TOTALS: 576,538$ Singe Axle Tanker Pricing Sheet Page 6 of 8 OCONEE COUNTY 2K TANKER Single Axle Tanker Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05. PART NO DESCRIPTION LIST PRICE == Compartment Accessories Tanker - 0.000 == -$ KA-00-0000 *** Header - Compartment Accessories*** -$ KA-05-0415 Adjustable Shelf Description -$ KA-05-0503 Adjustable Shelf Located in L1 1,044$ KA-05-0505 Adjustable Shelf Located in R1 1,044$ 2 COMP/ACC TOTALS: 2,088$ == Misc and Loose Equip - 0.000 == -$ KL-99-0010 *** Loose Equipment*** -$ KM-00-3015 Two (2) ZICO #SAC-44 Folding Wheel Chocks - (2) MTD Driver Side 1,605$ KM-00-4120 Aluminum Fol-Da-Tank - 2100 - 22OZ. HPR (9" x 30" x 135" Stored) FDTA-2100 2,437$ KM-00-4200 Fol-Da-Tank Liner Color - Red HPR -$ 5 LEQUIP TOTALS: 4,042$ == T Tanker Paint and Lettering - 0.000 == -$ MA-00-0000 ******* Header - Paint Section - Remove in Upainted Bodies ********** -$ MA-00-0005 General Paint Description - All Units -$ MA-00-0035 General Primer & Prep Description - "T" Tanker 7,362$ MA-00-0125 General Finish Paint Description - "T" Tanker -$ MA-00-0230 Body Buffing & Finish - "T" Tanker 3,226$ MA-01-0030 *********** Header - "T" Tanker Body Paint ************ -$ MA-01-0125 Inside/Underside Body Painted Black - "T" Tanker 2,091$ MA-01-1325 Compartment Interior W/ Zolatone - "T" Tanker 5,575$ MA-02-0035 Single Color Body Paint Scheme - "T" Tanker 1,701$ MA-04-0000 *********** Header - 2 Door Chassis Paint SA ************ -$ MA-04-0313 2 Door Two Tone - Match Customer Sample - Painted by Chassis Manufacturer 2,945$ MA-04-1010 Commercial Cab Paint Finish -$ MA-04-1200 Commercial Chassis Wheel and Hub Paint - As Provided -$ MA-04-1550 Pint of Touch Up Paint -$ MA-04-1620 Finalization & Detailing - "T" Tanker 1,152$ MA-04-1700 Anti-Corrosion Treatment 406$ MB-00-0005 ***************** Header - Lettering & Striping ***************** -$ MB-00-0100 Computer Generated Lettering -$ MB-00-0200 Front Cab Door Lettering -$ MB-00-0215 4" Scotchlite Letters - Update QTY!! 198$ MB-00-0290 Shade for Letters 161$ MB-00-0900 Lettering on Hose Bed Walls -$ MB-00-0910 10" Scotch-Lite Letters - Update QTY!! 527$ MB-00-0990 Shade for Letters 403$ MB-00-3700 Custom Fire Department Logo 1,662$ MB-00-3705 Scotch-Lite W/ Two Colors - Custom Logo 155$ MB-00-3720 Location - Custom Logo -$ MC-00-0100 NFPA Required Scotch-Lite Striping -$ MC-00-0120 4" Scotch-Lite Stripe on Cab and Body 2,038$ MC-00-1000 White Scotch-Lite -$ MC-00-2005 Rear Chevron Striping -$ MC-00-2015 Entire Rear -$ MC-00-2060 6" Full Rear Scotch-Lite Diamond Grade Chevron Striping 2,117$ MC-00-2110 Red & Fluorescent Yellow Green Diamond Grade Scotch-Lite -$ Singe Axle Tanker Pricing Sheet Page 7 of 8 OCONEE COUNTY 2K TANKER Single Axle Tanker Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05. PART NO DESCRIPTION LIST PRICE 6 PAINT TOTALS: 31,721$ == Tanker Warranty Package W/ Pump - 0.000 == -$ W0-00-0050 *** Proposed Warranty - Tanker W/ Pump ****** -$ WA-00-0005 Proposed - FES Warranty - Starting on In Service Date -$ WA-00-0260 Proposed - 1 Year New Material & Workmanship Warranty - Pumper & Tanker 9,300$ WA-00-0300 Proposed - 10 Year Body Structural Warranty -$ WA-00-0310 Proposed - 10 Year Body Corrosion Warranty - Commercial Chassis -$ WA-00-0330 Proposed - 7 Year Paint Finish Warranty -$ WA-00-0400 Proposed - 5 Year Lettering Warranty -$ WA-00-0410 Proposed - 1 Year Brightwork Warranty -$ WA-00-0500 Proposed - 10 Year Stainless Steel Warranty -$ WA-00-0520 Proposed - Lifetime Poly Tank Warranty - All Tanks -$ WA-00-0600 Proposed - Hale Fire Pump Limited Standard Warranty -$ WA-00-1110 Proposed - Akron Heavy Duty Valves 10 Year Warranty -$ 8 WARRANTY TOTALS: 9,300$ 1 TRUCK TOTALS: 576,538$ 2 COMP/ACC TOTALS: 2,088$ 5 LEQUIP TOTALS: 4,042$ 6 PAINT TOTALS: 31,721$ 8 WARRANTY TOTALS: 9,300$ QUOTE TOTALS: 623,689$ Percent Off List 16.90% List Price Per Truck Only 623,689$ Contract Price Per Truck Only (after contract discount) 518,283$ Grand Total for Six (6) Trucks 3,109,695$ Singe Axle Tanker Pricing Sheet Page 8 of 8 OCONEE COUNTY 2K TANKER Loose Equipment Pricing Sheet North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05 PART NO DESCRIPTION LIST PRICE EST28927 *** Loose Equipment*** -$ HFX50X100Y50S Ten (10) All American - HFX LDH Hose, 5" x 100', 5" Storz, Yellow 19,150$ DJ17X50R15N Eight (8) FireQuip - DJ800 Double Jacket Attack Hose, 1.75" x 50', Red 2,104$ DJ30X50B25N Four (4) FireQuip - DJ800Double Jacket Attack Hose, 3" x 50', 2.5" Couplings, Blue 2,420$ DJ30X50Y25N Two (2) FireQuip - DJ800 Double Jacket Attack Hose, 3" x 30', 2.5: Couplings, Yellow 1,210$ ME2VPGI-262 Two (2) TFT - Initial Attack - METRO 2 W/GRIP 1.5"NHF, 185 GPM @ 50 PSI 3,402$ A-G1FS442MD2C0LAR Two (2) MSA - G1 SCBA SYSTEM PRESSURE 4 4500 PSIG CYLINDER CONNECTION 4 CGA Quick Connect Remote Con HARNESS 2 Standard wth Chest Strap CRADLE TYPE M Metal Band LUMBAR TYPE D Adj. Swivel Solid Buckle REGULATOR TYPE 2 Solid Cover Left Shd. REGULATOR HOSE TYPE C Continuous EMERGENCY BREATHING SUPPORT 0 None SPEAKER MODULE L Left Chest PASS A PASS Right Shoulder BATTERY TYPE R Rechargeable 19,866$ 10175708 Four (4) MSA - CYL VLV QC G1 RC 4500 PSIG, LP , 45 MINUTE CYLINDER 7,560$ 10161816 Two (2) MSA - Fcpc, G1, FS, MD, MD NC, 5PT C-HARN,C-N 1,222$ 7982001 Akron - Revolution Piston Intake Valve, w/ 30 Degree Swivel Elbow Inlet, w/ 5" Storz & 6" LH inlet 3,230$ 35R2525-H52 Two (2) Kochek - 2.5 NH X 2.5 NH DBL SW RL F -FG-,ADAPTERS 295$ 36R2525-H52 Two (2) Kochek - 2.5 NH X 2.5 NH DBL RL M -FG-,ADAPTERS 146$ K36R2525-P09 Two (2) Kochek - 2.5 CAMLOCK M X 2.5 NH RIG M,CAMLOCK ADAPTER 205$ K37R2525-P09 Two (2) Kochek - 2.5 CAMLOCK M X 2.5 NH RIG RL F ,CAMLOCK ADAPTER 200$ 44451 Two (2) Streamlight - Fire Vulcan: Vehicle Mount System, 12V DC, w/ Quick Release Shoulder Strap & Direct Wire Rack, Orange 727$ FA-6 Fire Hooks - Flathead Axe, Fiberglass Handle 75$ PB-30 Fire Hooks - Pro Bar: 30", Aircraft Steel, Nickel Plated 296$ K5003-B PAC Tool - MOUNTING KIT: *IRONSLOK KIT Black 283$ 2507101 Elkhart - Wyes: 2.5 FNH, (2)1.5 MNH, 2-way, Elk-O-Lite 554$ LL602-1-P07-P18 Kochek - 6 NH L/L STRAINER W/8" TUBING 1.5 NH JET & EXTERNA, STRAINERS 1,457$ 09K25225M-H52 Kochek - GATE VALVE 2.5 NH SW RL F X 2.5 NH M, VALVES 728$ S54L545-H52 Kochek - 5 STZ W/LCK X 4.5 NH SW LH F -FG-, STORZ ADAPTER 413$ K45-3-P18-P09 Three (3) Kochek - ONE #K05 AND TWO #K01 W/HOLDER SILVADILLO,WRENCH 788$ KS34-P18-P09 Kochek - SET OF(4) STORZ X SPANNER WRENCH W/HLDR,WRENCH 239$ QL48Z25C Three (3) South Park Quic-Loc 2.5" Mounting Plate 169$ Service labor Labor to mount equipment 800$ Shop Supplies Supplies to mount equipment 50$ LOOSE EQUIPMENT TOTALS 67,587$ Percent Off List 38.39% List Price Loose Equipment Per Truck 67,587$ Contract Price Loose Equipment Per Truck Only (after contract discount) 41,640$ Grand Total Loose Equipment for 6 Trucks 249,840$ Loose Equipment Pricing Sheet Page 1 of 1 Oconee County 2000 Gallon Tanker June 12, 2024 North Carolina Sheriff's Association Contract Number Contract Number 25-05-0521 / FES24-05 Oconee County 2k Tanker 06/12/2024 Page 1 PROPOSAL Safe Industries is pleased to offer the proposed vehicle to meet the intent of the fire department specifications. Fire Equipment Sales and Services is a manufacturer in commercial fire fighting vehicles. Questions or concerns pertaining to this proposal can be answered by contacting the following FES representative: Safe Industries 5031 Highway 153 Easley, SC 29642 Office: (864) 845-7175 Fax: (864) 845-7176 Cameron Marler Cell (864) 245-7937 cmarler@safeindustries.com After Hours Emergency Service Hotline: 1-864-845-7175 Option #3 GENERAL INFORMATION The proposed apparatus will be constructed to withstand the severe and continuous use encountered during emergency fire fighting services. The apparatus will be of the latest type, carefully designed and constructed with due consideration to the nature and distribution of the load to be sustained. This proposal details the general design criteria of cab and chassis components, aerial device (if applicable), fire pump and related components (if applicable), water tank (if applicable), fire body, electrical components, painting, and equipment. All items of these proposal specifications will conform to the fullest extent possible with the National Fire Protection Association Pamphlet No. 1900, latest edition, except as noted in the Statement -of-Exceptions. FES will furnish satisfactory evidence of our ability to construct, supply service parts and technical assistance for the apparatus specified. Oconee County 2k Tanker 06/12/2024 Page 2 FIRE APPARATUS COMPLETION DOCUMENTATION Fire Equipment Sales and Services will provide, at the time of apparatus delivery, at least one (1) copy of the following documents. The apparatus manufacturer's record of apparatus construction (build) details, including the information listed below: • Apparatus Owner's name and address • Apparatus manufacturer, model and serial number • Apparatus Chassis make, model and serial number • Front tire size, and total rated capacity (in pounds) • Rear tire size, and total rated capacity (in pounds) • Apparatus Chassis weight distribution in pounds, with water and equipment mounted, front and rear • Apparatus Engine make, model, serial number, rated horse power, rated speed and governed speed. • Type of fuel(s) used by apparatus and fuel tank(s) capacity • Apparatus electrical system - Voltage and Alternator output (in amps) • Battery make, model and total capacity (in cold crank amps) • Transmission make, model and serial number: If equipped, chassis transmission PTO(s) make, model and gear ratio • Pump make, model, rated capacity in gallons per minute (GPM) and serial number • Apparatus water tank certified capacity in gallons • Paint manufacturer and paint number(s) The apparatus manufacturer shall include certification of "slip resistance" for all stepping, standing and walking surfaces. If the apparatus has a fire pump, the following additional documents shall be provided: • The pump manufacturer's certification of suction capability • Copy of the apparatus manufacturer's approval for stationary pumping applications • Engine manufacturer's certified brake horsepower curve for the engine provided, showing the maximum governed speed. • Pump manufacturer's certification of hydrostatic test (if it applies) • The independent third party certification of inspection and test for the apparatus fire pump If the apparatus has a "fixed line" voltage power source, there shall be documentation of the fixed power source test certification. If the apparatus features an air system, there shall be test results of the air quality, SCBA fill station and the installation of the air system. The apparatus manufacturer shall provide documentation from a certified weight scale. This documentation shall show actual loading on the front axle, rear axle(s) and overall vehicle weight. This weight shall include the weight of the "full" apparatus water tank. This documentation shall be provided with the completed apparatus build to determine compliance with NFPA 1901 latest addition. Electrical performance testing documentation and a written load analysis report shall be provided with the completed apparatus. If the apparatus features a water tank, the water tank capacity certification shall be supplied by the tank manufacturer. Oconee County 2k Tanker 06/12/2024 Page 3 APPARATUS FMVSS CERTIFICATION The proposed chassis will be certified by FES as conforming to all applicable Federal Motor Vehicle Safety Standards (FMVSS) in effect at the da

Text truncated. Open the original for the full document.

Source: Oconee County website. First collected Nov 19, 2026.