1
STATE OF SOUTH CAROLINA
COUNTY OF OCONEE
ORDINANCE 2024-20
AN ORDINANCE AUTHORIZING OCONEE COUNTY, SOUTH
CAROLINA TO FINANCE AND ACQUIRE CERTAIN TANKER
TRUCKS AND RELATED EQUIPMENT IN AN AMOUNT NOT
EXCEEDING $ 3,380,000; TO EXECUTE AND DELIVER ALL
DOCUMENTS NECESSARY TO CARRY OUT THE FINANCING
AND ACQUISITION; AND OTHER RELATED MATTERS.
Pursuant to the authority of the Constitution of the State of South Carolina (“State”) and the general laws
of the State, BE IT ENACTED BY OCONEE COUNTY COUNCIL:
Section 1. Findings and Determinations.
(a) Oconee County (“County”) is a body corporate and politic and political subdivision of the State
and has the power to enter into agreements to finance and acquire equipment.
(b) The County desires to acquire and finance certain tanker trucks and related equipment in an
amount not exceeding $3,380,000 (“Equipment”), through means of borrowing money from a bank
or other financial institution selected by the County Administrator (“Financing”).
(c) It is in the best interest of the County to acquire the Equipment by entering into the Financing,
and the Financing will enable the County to acquire the Equipment, which is necessary for the
County’s proper operation.
Section 2. Approval of Acquisition and Financing; Delegation of Authority. The County shall acquire
and finance the Equipment in accord ance with a lease -purchase financing arrangement, or other similar
means of financing, which is repayable by annual appropriations from operational millage, or other
sources, or from general obligation indebtedness, as the County Administrator may determine.
If the Financing is accomplished through a traditional lease -purchase arrangement, the Financing will
not constitute a “financing agreement,” and the Equipment will not constitute an “asset” as these terms are
defined in South Carolina Code Annotated se ction 11-27-110. Thus, the amount of the Financing will not
be includable when calculating the County’s constitutional debt limit, and the Financing will be subject to
annual appropriation by the County. Should the Financing be accomplished through any alt ernative
means, the County Administrator shall likewise endeavor to ensure the Financing does not count against
the County’s constitutional debt limit.
At the County Administrator’s direction, in consultation with the County Attorney and the County’s
Bond Counsel, the County shall distribute a request for offers or provide for a similar notice to three or
more banks and/ or other financial institutions. Without further authorization, the County Council
delegates to the County Administrator the authority to ( a) determine the payment schedule under the
Financing; (b) determine the date and time for receipt of offers; (c) award the Financing using a number of
factors, including applicable interest rate, provided the net interest cost does not exceed 6.0% per ann um;
and (d) make reasonable changes to the quantity, cost, or description of the Equipment, a substantially final
2
list of which is attached as Schedule I.
Section 3. Approval of Agreements. Without further authorization, the County Administrator is
authorized to approve the form, terms, and provisions of the Financing. The County Administrator is
authorized, empowered, and directed to execute, acknowledge, and deliver the various documents
necessary to carry out the Equipment acquisition and Financing (“Tra nsaction Documents”) in the name
and on behalf of the County. The Transaction Documents are to be in the form as shall be approved by the
County Administrator in consultation with the County Attorney and Bond Counsel, the execution thereof
to constitute conclusive evidence of that approval.
Section 4. Execution of Documents. The County Council Chairman, the County Administrator, the
County Attorney, and the Clerk to County Council are fully empowered and authorized to take further
action and to execute and deliver all documents as may be reasonably necessary to effect the Financing and
the delivery of the Transaction Documents and any related documents in accordance with their terms, and
the contemplated transactions, and the action of these officers in exec uting and delivering any of these
documents, in the form as the County Administrator shall approve, in consultation with the County
Attorney and the County’s Bond Counsel, is fully authorized.
Section 5. Federal Tax Covenant. The County covenants that it will not take , or fail to take, any action
which will cause interest components of the payments to be made under the Transaction Documents to
become includable in the gross income of the successful Bidder or its successors or assignees for federal
income tax purposes pursuant to the provisions of the Internal Revenue Code of 1986, as amended (“IRC”),
and regulations promulgated thereunder in effect on the date of original issuance of the Transaction
Documents, and that the County will comply with all applicable provisions of Section 103 and Sections 141
through 150 of the IRC, and any regulations promulgated thereunder, to maintain the exclusion from gross
income for federal income tax purposes of the interest portion of the pay ments to be made under the
Transaction Documents; and to that end the County shall:
(a) comply with the applicable provisions of Section 103 and 141 through 150 of the IRC and any
regulations promulgated thereunder so long as the Financing is outstanding;
(b) establish funds, make calculations, and pay amounts in the manner and at the times required
to comply with the requirements of the IRC relating to required rebates of certain amounts to the
United States; and
(c) make reports of information at the times and places required by the IRC.
If at the time the Financing is closed, the County does not reasonably anticipate issuing more than
$10,000,000 in tax-exempt obligations which are not “private activity bonds” during calendar year 2024, all
within the meaning of Section 265(b) of the IRC, then the County intends to designate the Financing as a
“qualified tax-exempt obligation” in accordance with Section 265(b)(3) of the IRC.
The County will timely file Form 8038 -G in accordance with the applicable regulations of the Internal
Revenue Service.
Section 6. Bond Counsel. The County selects King Kozlarek Root Law LLC to serve as its Bond Counsel
related to this Financing and understands Bond Counsel’s role will be limited to those matters necessary
to effect the Financing and issue a customary bond counsel opinion (including related to any tax
consequences). Further, the County understands Bond Counsel does not provide financial advisory or
municipal advisory services but offers legal advice and services of a trad itional legal nature.
3
Section 7. Financial Advisor. The County serves as its own financial/municipal advisor related to the
Financing.
Section 8. Severability. All orders, resolutions, and ordinances, including any parts thereof, in conflict
with this Ordinance are, to the extent of any such conflict, repealed.
Section 9. Effective Date. This Ordinance takes and remains in effect only after the County Council has
approved it following three readings and a public hearing.
[ONE SIGNATURE PAGE AND ONE SCHEDULE FOLLOW]
[REMAINDER OF PAGE INTENTIONALLY BLANK]
4
OCONEE COUNTY, SOUTH CAROLINA
Matthew Durham
Chairman, Oconee County Council
(SEAL)
ATTEST:
Jennifer C. Adams
Clerk to Council
READINGS:
First reading: August 20, 2024
Second reading: September 3, 2024
Public Hearing: September 17, 2024
Third reading: September 17, 2024
5
SCHEDULE I
DESCRIPTION OF EQUIPMENT
Six (6) New FES/Freightliner Tanker Trucks
with related apparatuses and equipment
STATE OF SOUTH CAROLINA
COUNTY OF OCONEE
ORDINANCE 2024-23
AN ORDINANCE AMENDING PORTIONS OF CHAPTERS
32 AND 38 OF THE OCONEE COUNTY CODE OF
ORDINANCES, IN LIMITED REGARDS AND
PARTICULARS ONLY, IN ORDER TO REVISE CERTAIN
SETBACK-RELATED PROVISIONS, INCLUDING
DEFINITIONS AND THE APPLICATION THEREOF ; AND
OTHER MATTERS RELATED THERETO.
WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9-
25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political
subdivision of the State of South Carolina, acting by and through its governing body, the Oconee
County Council (“County Council”), has the authority to enact regulations, resolutions, and
ordinances, not inconsistent with the Constitution and the general law of the State of South
Carolina, including the exercise of such powers in relation to health and order within its boundaries
and respecting any subject as appears to it necessary and proper for the security, general welfare,
and convenience of the County or for preserving health, peace, order, and good government
therein;
WHEREAS, t he County has adopted multiple ordinances for the effective, efficient
governance of the County, which, subsequent to adoption, are codified in the Oconee County Code
of Ordinances (“Code of Ordinances”), as amended;
WHEREAS, the County is authorized by Section 4 -9-30(9) and Chapter 29 of Title 6 of
the South Carolina Code of Laws, among other sources, to impose land use standards in the
unincorporated areas of the County;
WHEREAS, County Council recognizes that there is a need to revise the law of the County
to meet the changing needs of the County and that there is a need to amend, specifically, Chapters
32 and 38 of the Code of Ordinances in order to revise certain setback-related provisions, including
definitions and the application thereof; and
WHEREAS, County Council has therefore determined to modify Chapter s 32 and 38 of
the Code of Ordinances and to affirm and preserve all other provisions of the Code of Ordinances
not specifically, or by implication, amended hereby.
NOW THEREFORE, it is hereby ordained by the Oconee County Council, in meeting
duly assembled, that:
1. Certain provisions related to lot setbacks, as contained in Chapters 32 and 38 of the
Code of Ordinances, are hereby revised, rewritten, and amended to read as set forth in Exhibit A
,
which is attached hereto incorporated herein by reference. Attached hereto as Exhibit B is a version
of Exhibit A which reflects the changes to the prior provisions; Exhibit B is for illustrative purposes
only and shall not be codified.
2. County Council hereby approves and adopts Exhibit A and directs that it be codified
in the Oconee County Code of Ordinances.
3. Should any part or provision of this Ordinance be deemed unconstitutional or
unenforceable by any court of competent jurisdiction, such determination shall not affect the
remainder of this Ordinance, all of which is hereby deemed separable.
4. All ordinances, orders, resolutions, and actions of County Council inconsistent
herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded.
Nothing contained herein, however, or in the attachment hereto, shall cancel, void, or revoke, or
shall be interpreted as cancelling, voiding, or revoking, ex post facto, in any regard any prior land
use provision, or decision of the County or County Council based thereon, which were valid and
legal at the time in effect and undertaken pursuant thereto, in any regard.
5. All other terms, provisions, and parts of the Code of Ordinances, and specifically,
but without exception, the remainder of Chapters 32 and 38, not amended hereby, directly or by
implication, shall remain in full force.
6. This Ordinance shall take effect and be in full force from and after third reading
and enactment by County Council.
ORDAINED in meeting, duly assembled, this ______ day of _________________, 2024.
ATTEST:
______________________________ _______________________________
Jennifer C. Adams Matthew Durham
Clerk to Oconee County Council Chair, Oconee County Council
First Reading: September 17, 2024
Second Reading: October 1, 2024
Public Hearing: October 15, 2024
Third Reading: October 15, 2024
EXHIBIT A
Chapter 32:
Sec. 32-212. Definitions.
When used in this article, the following words and terms shall have the meaning indicated.
Words and terms not herein defined shall have their customary dictionary definitions. The term
"shall" is mandatory. When not inconsistent with the content, words us ed in the singular number
include the plural and those used in the plural number include the singular.
. . .
Building line (also referred to as Building setback line) means a line beyond which no part of the
structure of any building shall project , unless specifically permitted in this Code of Ordinances ,
with the exception of subsurface projection of footings, measured perpendicular to the property
line. This includes, but is not limited to, the building, eaves, porches, decks, chimneys, ba y
windows, and fire escapes.
. . .
Flag lot means a lot shaped like a flag on a pole. The “flag” shaped area is situated behind another
lot and is the portion of a flag lot where structures may be located. The “pole” shaped area is the
portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See
Chapter 38 for specific provisions addressing flag lots.)
. . .
Lot means a single parcel or tract of contiguous land intended as a unit for transfer of ownership,
or for building development, or both.
(1) Corner lot means a lot with frontage on at least two intersecting roads located at the point of
intersection.
(2) Lot depth means the mean horizontal distance between the front and rear lot lines.
(3) Double frontage lot means a parcel having frontage on two or more roads which is not located
at any intersection of such roads.
(4) Lot width, unless indicated otherwise by context, means the straight-line distance between the
points where the front building line intersects the two side lot lines.
. . .
Setback means the required minimum distance between every structure and the lot lines of the lot
on which it is located (measured from the road right-of-way at the front of the lot if the road right-
of-way projects o ver the property line, and measured from the property lines on the remaining
portions of the property).
. . .
Setback line means the line indicating the minimum distance permitted between the property line
or road right-of-way line, as applicable, and the building line.
. . .
Yard means a space that lies between the principal building or buildings and the nearest lot line or
road right -of-way, as applicable. The minimum required yard shall be unoccupied and
unobstructed from the ground upward, except as may be expressly permitted.
(1) Front yard means a yard situated between the front building line and the front lot l ine or road
right-of-way, as applicable, extending the full width of the lot.
(2) Rear yard means a yard situated between the rear building line and the rear lot line extending
the full width of the lot.
(3) Side yard means a yard between the side building line and a side lot line that extends from the
front yard to the rear yard.
[Chapter 38 revisions on the following page]
Chapter 38:
Sec. 38-9.3. Dimensional requirements: General provisions and exceptions.
In addition to the dimensional require ments listed below and district dimensional requirements,
further dimensional requirements may be set forth in Article 5 for those uses listed as conditional.
The control free district shall be exempt from the provisions of this section except provisions listed
under item (2), setbacks.
(1) Lot size and configuration.
a. Public utilities and government. Public utilities and government uses shall not be subject
to the minimum lot size requirements, but shall meet the setback requirements.
b. Flag lots. Flag lots may be permitted under the following conditions:
1. The maximum length of the pole of a flag lot shall be 300 feet.
2. The minimum width of the pole of a flag lot shall be 22 feet, and the maximum
width of the pole of a flag lot shall be 40 feet.
3. The front setback shall be measured from where the flag portion of the flag lot
meets the district minimum width requirements.
4. The pole portion of a flag lot shall not be used to calculate area, width, or setbacks
of the lot or to provide off-street parking.
5. There shall be no more than one flag lot per each four lots, per subdivision or
development.
Flag lot illustration:
(2) Setbacks.
a. The required front, side, and rear yards for individual lots shall be measured inward toward
the center of said lot from all points along the respective front, side, and rear property lines of the
lot, or from the road right -of-way if applicable. Once the yard areas of a given lot have been
established, the remaining area of the lot which is not included in any required front, side, or rear
lot shall be known as the "buildable" area within which the approved structure(s) shall be placed.
b. Where a road right -of-way projects over a property line, the setback shall be measured
from the road right-of-way line.
c. Corner lots shall be considered to have two fronts and shall meet the front setback for the
district.
d. Front yard setbacks for double frontage lots shall be provided for both streets upon which
the lot has frontage, and any accessory use(s) shall be prohibited from the required front yard
setback of the street upon which the principal building fronts.
e. For lots not meeting the required minimum lot width for the respective district at the front
property line or road right -of-way, as applicable, the setback shall be measured such that the
distance from the front property line or road right -of-way, as applicable, shall nonetheless be
included in the measurement for the required setback. The buildable area shall not, however,
include any area where the minimum lot width is not met. This provision is meant to apply to
irregularly shaped lots, as generally determined by their existing lot width and c onfiguration in
relation to the district minimum lot width. This provision does not apply to flag lots. See Section
38-9.3(1)(b) for flag lot provisions.
f. Road design and encroachment criteria is governed by the standards in Chapter 26, of the
Oconee County Code of Ordinances, as amended.
g. Any garage door shall be set back a minimum of 20 feet from the property line that it faces
so that vehicles may be p arked in the driveway without encroaching into the right -of-way. If the
district setback is greater than 20 feet, then the more restrictive setback shall prevail.
h. The side and rear setbacks in the CCD and HCD shall not apply to the shared property line
of attached buildings.
i. The space in any required yard shall be open and unobstructed except for the ordinary
projections of window sills, cornices, eaves, window air conditioning units, and other architectural
features, provided that such features shall project no more than two feet into any required yard.
k. Steps and heating and cooling units may project into a required yard a distance not to
exceed five feet but no closer than five feet of a property line. Fences, freestanding walls, hedges,
and septic lines may be located in any setback, so long as they remain on the property.
Sec. 38-12.2. Definitions.
Building setbacks: The minimum distance from the property line or road right -of-way line, as
applicable, to the closest projection of the exterior face of buildings, walls, or other form of
construction (i.e., decks, landings, terraces, porches, and patios on grade).
Building setback line (also referred to as Building line): The line beyond which no part of the
structure of any building shall projec t unless specially permitted in this Code of Ordinances and
with the exception of subsurface projection of footings, measured perpendicular to the property
line. This includes, but is not limited to, the building, eaves, porches, decks, chimneys, bay
windows, and fire escapes.
Front yard setback—Shall be measured from the front property line or, if the road right -
of-way projects over the front property line, then from the road right -of-way, all as
shown on tax maps.
Side and rear yard setbacks —Shall be m easured from the property lines as shown on
tax maps.
Corner lot setbacks—Shall be measured from each front property line or if a road right -
of-way projects over the front property line(s), then from the road right-of-way(s).
On a flag lot the building setback line runs parallel to the street and is measured from
the point in the “flag” portion of the lot where the required minimum lot size is met and
which is closest to the street.
. . .
Flag lot: A lot shaped like a flag on a pole. The “flag” shaped area is situated behind another lot
and is the portion of a flag lot where structures may be located. The “pole” shaped area is the
portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See
Chapter 38 for specific provisions addressing flag lots.)
. . .
Lot, width: The straight-line distance between the points where the building setback line intersects
the two side lot lines, unless indicated otherwise by context.
. . .
Setback: The required mini mum distance between every structure and the lot lines of the lot on
which it is located (measured from the road right-of-way at the front of the lot if the road right-of-
way projects over the property line, and measured from the property lines on the rema ining
portions of the property).
. . .
Yard:
Yard means a space that lies between the principal building or buildings and the nearest lot line or
road right -of-way, as applicable. The minimum required yard shall be unoccupied and
unobstructed from the ground upward, except as may be expressly permitted.
(1) Front yard means a yard situated between the front building line and the front lot line or road
right-of-way, as applicable, extending the full width of the lot.
(2) Rear yard means a yard situated between the rear building line and the rear lot line extending
the full width of the lot.
(3) Side yard means a yard between the side building line and a side lot line that extends from the
front yard to the rear yard.
EXHIBIT B
Chapter 32:
Sec. 32-212. Definitions.
When used in this article, the following words and terms shall have the meaning indicated.
Words and terms not herein defined shall have their customary dictionary definitions. The term
"shall" is mandatory. When not inconsistent with the content, words used in the singular number
include the plural and those used in the plural number include the singular.
. . .
Building line (also referred to as Building setback line) means a line beyond which no part of the
structure of any building shall project , unless specifically permitted in this Code of Ordinances ,
with the exception of subsurface projection of footings, measured perpendicular to the property
line. This includes, but is not limited to, the building, eaves, porches, decks, chimneys, bay
windows, and fire escapes.
. . .
Flag lot means a lot shaped like a flag on a pole. The “flag” shaped area is situated behind another
lot and is the portion of a flag lot where structures may be located. The “pole” shaped area is the
portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See
Chapter 38 for specific provisions addressing flag lots.)
. . .
Lot means a single parcel or tract of contiguous land intended as a unit for transf er of ownership,
or for building development, or both.
(1) Corner lot means a lot with frontage on at least two intersecting roads located at the point of
intersection.
(2) Lot depth means the mean horizontal distance between the front and rear lot lines.
(3) Double frontage lot means a parcel having frontage on two or more roads which is not located
at any intersection of such roads.
(4) Lot width, unless indicated otherwise by context, means the straight-line distance between the
points where the front building line intersects the two side lot lines. the horizontal distance between
the side lot lines at the building setback line measured parallel with the front lot line or in the case
of a curvilinear road measured parallel to the chord of the arc between the intersection of the side
lot lines and the road right-of-way line.
. . .
Setback means the required minimum distance between every structure and the lot lines of the lot
on which it is located (measured from the road right-of-way at the front of the lot if the road right-
of-way projects over the property line, and measured from the property lines on the remaining
portions of the property).
. . .
Setback line means the line indicating the minimum distance permitted between the property line
or road right-of-way line, as applicable, and the building line.
. . .
Yard means a space that lies between the on the same lot with a principal building or buildings
and the nearest lot line or road right-of-way, as applicable. The minimum required yard shall be
unoccupied and unobstructed from the ground upward, except as may be expressly permittedopen,
unoccupied, and unobstructed by buildings or structures from ground to sky except where
encroachments and accessory buildings and structures are expressly permitted.
(1) Front yard means a yard situated between the front building line and the front lot line or road
right-of-way, as applicable, extending the full width of the lot.
(2) Rear yard means a yard situated between the rear building line and the rear lot line extending
the full width of the lot.
(3) Side yard means a yard between the side building line and a side lot line that extends from the
front yard to the rear yard.
[Chapter 38 revisions on the following page]
Chapter 38:
Sec. 38-9.3. Dimensional requirements: General provisions and exceptions.
In addition to the dimensional requirements listed below and district dimensional requirements,
further dimensional requirements may be set forth in Article 5 for those uses listed as conditional.
The control free district shall be exempt from the provisions of this section. The control free district
shall be exempt from the provisions of this section except provisions listed under item (2),
setbacks.
(1) Lot size and configuration.
a. Public utilities and government. Public utilities and government uses shall not be subject
to the minimum lot size requirements, but shall meet the setback requirements.
b. Flag lots . A flag lot shall contain no more than two single -family dwellings and
uninhabited accessory structures. Flag lots may be permitted under the following conditions:
1. The maximum flagpole length of the pole of a flag lot shall be 300 feet.
2. The minimum flagpole width of the pole of a flag lot shall be 2230 feet, and the
maximum width of the pole of a flag lot shall be 40 feet.
3. The front setback shall be measured from where the flag portion of the flag lot
meets the district minimum width requirements.
4. The flagpole portion of a the flag lot shall not be used to calculate ar ea, width, or
setbacks of the lot or to provide off-street parking.
5. There shall be no more than one flag lot per each four lots, per subdivision or
development.
Flag lot illustration:
(2) Setbacks.
a. The required front, side, and rear yards for individual lots shall be measured inward toward
the center of said lot from all points along the respective front, side, and rear property lines of the
lot, or from the road right -of-way if applicable. Once the yard areas of a given lot have been
established, the remaining area of the lot which is not included in any required front, side, or rear
lot shall be known as the "buildable" area within which the approved structure(s) shall be placed.
b. Where a property abuts a road street right-of-way projects over a property line, the setback
shall be measured from the road right-of-way line.
c. Corner lots shall be considered to have two fronts and shall meet the front setback for the
district.
d. Front yard setbacks for double frontage lots shall be provided for both streets upon which
the lot has frontage, and any accessory use(s) shall be prohibited from the required front yard
setback of the street upon which the principal building fronts.
e. For lots not meeting the required minimum lot width for the respective district at the front
property line or road right -of-way, as applicable, the setback shall be measured such that the
distance from the front property line or road right -of-way, as applicable, shall nonetheless be
included in the measurement for the required setback. The buildable area shall not, however,
include any area where the minimum lot width is not met. This provision is meant to apply to
irregularly shaped lots , as generally determined by the ir existing lot width and configuration in
relation to the district minimum lot width. This provision does not apply to flag lots . See Section
38-9.3(1)(b) for flag lot provisions.
fe. Road design and encroachment criteria is governed by the standards in Chapter 26, of the
Oconee County Code of Ordinances, as amended.
gf. Any garage door shall be set back a minimum of 20 feet from the property line that it
faces so that vehicles may be parked in the driveway without encroaching into the right-of-way.
If the district setback is greater than 20 feet, then the more restrictive setback shall prevail.
hg. The side and rear setbacks in the CCD and HCD shall not apply to the shared property
line of attached buildings.
ih. The space in any required yard shall be open and unobstructed except for the ordinary
projections of window sills, cornices, eaves, window air conditioning units, and other
architectural features, provided that such features shall project no more than two feet into any
required yard.
ki. Steps and heating and cooling units may project into a required yard a distance not to
exceed five feet but no closer than five feet of a property line. Fences, freestanding walls,
hedges, and septic lines may be located in any setback, so long as they remain on the property.
Sec. 38-12.2. Definitions.
Building setbacks: The minimum distance from the property line or road right -of-way line, as
applicable, to the closest projection of the exterior face of buildings, walls, or other form of
construction (i.e., decks, landings, terraces, porches, and patios on grade).
Building setback line (also referred to as Building line): The line beyond which no part of the
structure of any building shall project unless specially permitted in this Code of Ordinances and
with the exception of subsurface projection of footings, measured perpendicular to the property
line. This includes, but is not limited to, the building, eaves, porches, decks, chimneys, bay
windows, and fire escapes.
Building setback line: The line on the front, rear, and sides of a lot, set according to the district
regulations, which delineates the areas upon which a structure may be built or maintained. At the
time of application, all yard setbacks are determined from the most recent Oconee County Ta x
Map.
Front yard setback—Shall be measured from the front property line or, i f the roadway
right-of-way projects over the front property line, then from the road right-of-way, all as
shown on tax maps.
Side and rear yard setbacks —Shall be measured from the property lines as shown on
tax maps.
Corner lot setbacks—Shall be measured from each front property line or if a the roadway
right-of-ways projects over the front property line (s), then from the road right -of-
way(s)it is adjacent to.
On a flag lot the "building setback line" runs parallel to the street and is measured from
the point in the “flag” main portion of the lot where the required minimum lot size is
met and (i.e. the "flag" part of the lot, not the "pole" part), which is closest to the street.
(The minimum lot width must be met in this area, as well. Therefore, if the point closest
to the street is a corner rather than a line, the setback will have to extend as far as
necessary to meet the required minimum lot width!)
. . .
Flag lot: A lot shaped like a flag on a pole. The “flag” shaped area is situated behind another lot
and is the portion of a flag lot where structures may be located. The “pole” shaped area is the
portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See
Chapter 38 for specific provisions addressing flag lots.)
. . .
Lot, width: The straight linestraight-line distance between the point s where the building setback
line intersects the two side lot lines, unless indicated otherwise by context.
. . .
Setback: The required minimum distance between every structure and the lot lines of the lot on
which it is located (measured from the road right-of-way at the front of the lot if the road right-of-
way projects over the property line, and measured from the property lines on the remaining
portions of the property).
The required minimum distance between every structure and the lot lines of the lot on which it is
located (measured from the road right -of-way in the front and property lines on the remaining
portions of the property).
. . .
Yard:
Yard: An open space that lies between the principal building or buildings and the nearest lot
line. The minimum required yard as set forth in this chapter is unoccupied and unobstructed from
the ground upward, except as may be expressly permitted.
Yard, front (highway yard): A yard across the full width of the lot extending from the front
line of the building.
Yard, rear: A yard extending across the full width of the lot and measured between the rear
line of the lot and the rear line of the main building.
Yard, side: An open space on the same lot with a building, between the building and the side
line of the lot, extending through, from the front building line, to the rear of the lot.
Yard means a space that lies between the principal building or buildings and the nearest lot line or
road right -of-way, as applicable. The minimum required yard shall be unoccupied and
unobstructed from the ground upward, except as may be expressly permitted.
(1) Front yard means a yard situated between the front building line and the front lot line or road
right-of-way, as applicable, extending the full width of the lot.
(2) Rear yard means a yard situated between the rear building line and the rear lot line extending
the full width of the lot.
(3) Side yard means a yard between the side building line and a side lot line that extends from the
front yard to the rear yard.
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items
Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It
is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the
Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 17, 2024
COUNCIL MEETING TIME: 6:00 PM
ITEM TITLE [Brief Statement]:
Council discussion and consideration of the submission of the FY 2024 National Dam Safety Program Rehabilitation of
High Hazard Potential Dam (HHPD) grant application to the South Carolina Department of Environmental Services on
behalf of the Chattooga Lake Club.
BACKGROUND DESCRIPTION:
• Through the Rehabilitation of High Hazard Potential Dams (HHPD) Grant Program, FEMA’s National Dam Safety
Program (NDSP) has made federal funds available to states for FFY24 for pass through to non-Federal governmental
organizations or nonprofit organizations to rehabilitate eligible HHPDs that fail to meet minimum state dam safety
standards and pose an unacceptable risk to life and property. The Chattooga Lake Club is a private organization, as is
the dam in consideration.
• Eligible applicants may choose to sponsor a privately-owned dam solely at its own discretion and at its own risk.
• DES is in the process of applying for the FFY24 grant and, if receiving funds, will offer subawards to eligible
applicants for activities that promote the goals of the federal grant program.
• A privately-owned dam may be eligible, but the owner cannot apply directly. A non-federal government (i.e., state,
county, municipal) or a 501(c)(3) non-profit organization are the only entities eligible to apply.
• Subawards require a match of at least 35% in the form of non-federal funds and/or in-kind services.
• The tentative deadline to submit application to DES is November 1, 2024.
• All applicable federal standards and requirements must be satisfied for the awarded HHPD grant and any subawards.
Failure to comply with federal grant requirements in the execution of a grant award may result in termination of the
grant agreement and collection of some or all federal funds received.
• Oconee County, as the applicant, is responsible for meeting all match / grant requirements, including procurement,
records management, and legal fees if Chattooga Lake Club is unable to meet the requirements.
SPECIAL CONSIDERATIONS OR CONCERNS [only if applicable]:
FINANCIAL IMPACT [Brief Statement]:
• The estimated costs for the project total $1,165,000.
• If awarded, Chattooga Lake Club will provide a 39% non-federal match to meet the requirements under the grant
program. Any costs above the estimated amount will also be the responsibility of Chattooga Lake Club.
• The grant requires a legally enforceable covenant or agreement between the dam owner and Oconee County, the local
government with jurisdictional authority under the National Flood Insurance Program that ensures that the feature will
be maintained by the eligible subrecipient or state if not maintained according to the Operation and Maintenance Plan
by the dam owner.
• Oconee County legal support will be required to draw up the legally enforceable covenant or agreement.
• A licensed Professional Engineer (PE) registered in South Carolina must assist in the preparation of your subaward
grant application.
• Engineering services funded from a HHPD grant must be procured in compliance with all federal and state
procurement requirements and the applicant’s own procurement policies.
ATTACHMENTS:
Chattooga Lake Club submitted budget
Chattooga Lake Club Request for Support
FY 2024 Rehabilitation of High Hazard Potential Dams (HHPD) Notice of Funding Opportunity
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items
Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It
is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the
Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
STAFF RECOMMENDATION [Brief Statement]:
It is the staff’s recommendation that Council consider the submission of the FY 2024 National Dam Safety Program
Rehabilitation of High Hazard Potential Dam (HHPD) grant application to the South Carolina Department of
Environmental Services.
Prepared by: Approved for Submittal to Council:
__________________________ _____________________________________
Brittney Martin, Grants Administrator Amanda F. Brock, County Administrator
Chattooga Lake Dam, located in Mountain Rest, SC, will install a new primary spillway system
including an intake structure and main drain. The original spillway system is deteriorating and
no longer meets current regulatory safety standards. To mitigate against dam failure, the
original system will be sealed after the new primary system is completed. This project will
protect downstream population, structures and infrastructure from potential flooding, while
protecting the water source for firefighting resources, recreational use and wildlife.
In working with Oconee County, SC as the Subrecipient, Chattooga Lake Club applied for and
received Project Scoping High Hazard Potential Dam (HHPD) grant funds to cover the costs of
engineering studies and design. Memorandum of Understanding (MOU) between Oconee
County and Chattooga Lake Club was approved November 4, 2022. Sub Award Agreement
between SC Department of Health and Oconee County, SC Agreement # EQ-3-591 was approved
January 6, 2023. The new primary spillway system has been recommended as a long-term
solution by Howard Leonard P .E., Peritus Civil, Inc.
Chattooga Lake Club is requesting Oconee County’s support as Subrecipient to apply for HHPD
grant funds for the construction phase, including:
1. Operations and Maintenance Plan legally enforceable covenant or agreement between
County and Chattooga Lake Club
2. Floodplain Management PLAN developed for Chattooga Lake Dam no later than 1 year
after award agreement and implemented no later than 1 year after project completion
3. Assurance Statements/Certifications
4. Solicit bids following County Procurement Policy
Estimated costs for the project are $1,165MM. If awarded, Chattooga Lake Club will provide
Non-Federal Cost Share of 39% and FEMA will provide the balance.
1
The Department of Homeland Security (DHS)
Notice of Funding Opportunity (NOFO)
Fiscal Year 2024 Fall
Rehabilitation of High Hazard Potential Dams (HHPD)
SUMMARY OVERVIEW OF KEY INFORMATION
FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) REHABILITATION
OF HIGH HAZARD POTENTIAL DAMS (HHPD)
Program The Rehabilitation of High Hazard Potential Dams (HHPD) Grant
Overview Program makes available federal funds to eligible states for pass
through to non-Federal governmental organizations or nonprofit
organizations for the rehabilitation of eligible high hazard potential
dams that fail to meet minimum state dam safety standards and pose
unacceptable risk to life and property.
For the purposes of the HHPD Grant Program, rehabilitation means the
repair, replacement, reconstruction, or removal of a dam to meet
applicable state dam safety and security standards.
The Fiscal Year 2024 Fall HHPD grant is available to support two
categories of funding:
(1) Project Scoping, Engineering and Design and
(2) Construction Projects.
Goals and
Objective
Reduce or eliminate risk of eligible high hazard potential dams.
The HHPD grant program incentivizes eligible states to:
• Provide financial assistance for repair, removal, or rehabilitation
of eligible high hazard potential dams.
• Incorporate risk-informed analysis and decision making into
their dam safety practice and HHPD rehabilitation investments.
• Incorporate risk-analysis results and information and consider all
dam risk in state, local, Tribal, and territorial mitigation
planning.
• Promote community preparedness by requiring recipients to
develop and implement floodplain management plans that
address potential measures, practices, and policies to reduce loss
of life, injuries, damage to property and facilities, public
expenditures, and other adverse effects of flooding.
• Reduce costs associated with dam rehabilitation through the
deployment of innovative solutions and technologies.
Eligible Projects HHPD grants assistance to high hazard dams listed in the National
Inventory of Dams with a condition assessment of Poor or
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
2
Unsatisfactory and dams in Fair condition with a population at risk
(PAR) at or above one thousand.
HHPD funds the following activities:
• Rehabilitation (Repair, Replacement, Reconstruction, or
Removal) of eligible high hazard potential dams
• Any other structural or nonstructural measures to rehabilitate an
eligible high hazard potential dam.
At project sites where Bipartisan Infrastructure Law (BIL) funding is
being used for hazard mitigation projects, the use of public signage is a
way to inform taxpayers about how BIL funds are being spent and
advance the goals of accountability and transparency in federal
spending. For more information on the federal government’s signage
initiative relating to infrastructure investments, see the Office of
Management and Budget’s February 24, 2023, Controller Alert, “CA
-
23-6, Enhancing Transparency Through Use of the Investing in America
Emblem on Signs (UPDATED).” OMB’s Controller Alert.
If an HHPD applicant does not have a state mitigation plan that includes
all dam risks, the applicant may request an extension to meet this
requirement. (See Section H.13., Mitigation Plan Requirement
Extension Requests).
Additionally, for construction projects that are not funded by the BIL,
publicly visible signage identifying the NDSP / HHPD funding source
of the project promotes public awareness, participation in the program,
and investment in building a resilient nation.
Deadlines NOFO Availability Window Start Date: 11/06/2023 09:00:00 AM ET
NOFO Availability Window End Date: 02/29/2024
Applicant Eligibility Period Start Date: Period of Performance starts
when grant is awarded (signed, obligated, and notified to recipient)
Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET
Funding Amount Available Funding for the NOFO: $185,120,000.00
Eligible
Applicants
• States
• District of Columbia
• U.S. territories
Cost Share Assistance provided under the HHPD grant is subject to a non-Federal
cost-sharing requirement of not less than 35 percent. Federal funding is
available for up to 65 percent of the eligible activity costs. The
remaining 35 percent of eligible activity costs must be derived from
non-federal sources, which may be in-kind.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
3
Requirements for cash and third-party in-kind contributions can be
found in 2 Code of Federal Regulations § 200.306.
The non-Federal cost share contribution is not limited to 35 percent.
All entities wishing to do business with the federal government must have a unique entity
identifier (UEI). The UEI number is issued by the system. Requesting a UEI using Sam.gov
can be found at:
Grants.gov registration information can be found at:
https://www.grants.gov/web/grants/register.html.
Planned UEI Updates in Grant Application Forms:
On April 4, 2022, the Data Universal Numbering System (DUNS) Number was replaced
by a new, non-proprietary identifier requested in, and assigned by, the System for Award
Management (SAM.gov). This new identifier is the Unique Entity Identifier (UEI).
Additional Information can be found on Grants.gov:
https://www.grants.gov/web/grants/forms/planned-uei-updates.html
Contents
Planned UEI Updates in Grant Application Forms: ....................................................................... 3
A. Program Description................................................................................................................ 7
1. Issued By.......................................................................................................................... 7
2. Assistance Listings Number ............................................................................................ 7
3. Assistance Listings Title.................................................................................................. 7
4. Funding Opportunity Title ............................................................................................... 7
5. Funding Opportunity Number.......................................................................................... 7
6. Authorizing Authority for Program ................................................................................. 7
7. Appropriation Authority for Program.............................................................................. 7
8. Announcement Type........................................................................................................ 7
9. Program Category ............................................................................................................ 7
10. Program Overview, Objectives, and Priorities ................................................................ 7
11. Performance Measures..................................................................................................... 9
B. Federal Award Information ..................................................................................................... 9
1. Available Funding for the NOFO: $185,120,000.00...................................................... 9
2. Projected Number of Awards: 50 ................................................................................ 10
3. Period of Performance: 36 Months ............................................................................ 10
4. Funding Instrument Type: Grant .................................................................... 10
C. Eligibility Information........................................................................................................... 10
1. Eligible Applicants......................................................................................................... 10
2. Applicant Eligibility Criteria ......................................................................................... 10
3. Subrecipient Eligibility Criteria..................................................................................... 11
4. Other Program-Specific Eligibility Criteria................................................................... 12
5. Cost Share or Match....................................................................................................... 15
D. Application and Submission Information.............................................................................. 16
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
4
1. Key Dates and Times..................................................................................................... 16
a. Application Start Date: 11/06/2023 at 09:00:00 AM ET ...................................... 16
b. Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET ....................... 16
c. Anticipated Funding Selection Date: No later than 03/25/2024 .......................... 17
d. Anticipated Award Date: No later than 04/08/2024 ............................................. 17
e. Other Key Dates ........................................................................................................ 17
2. Agreeing to Terms and Conditions of the Award.......................................................... 17
3. Address to Request Application Package ...................................................................... 17
4. Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award
Management (SAM), and Submit an Application ......................................................... 17
5. Electronic Delivery ........................................................................................................ 19
6. How to Register to Apply .............................................................................................. 19
a. General Instructions: ................................................................................................. 19
b. Obtain a UEI Number: .............................................................................................. 19
c. Obtain Employer Identification Number:.................................................................. 19
d. Create a login.gov account: ....................................................................................... 20
e. Register with SAM:................................................................................................... 20
f. Register in FEMA GO, Add the Organization to the System, and Establish the AOR:
21
7. Submitting the Application............................................................................................ 21
8. Timely Receipt Requirements and Proof of Timely Submission .................................. 21
9. Content and Form of Application Submission............................................................... 22
a. Standard Required Application Forms and Information ........................................... 22
b. Program-Specific Required Forms and Information ................................................. 23
10. Other Submission Requirements.................................................................................... 24
11. Intergovernmental Review............................................................................................. 25
12. Funding Restrictions and Allowable Costs.................................................................... 25
a. Requirements Related to Contractor and Subcontractor Wages ............................... 26
b. Requirements Related to Contract and Subcontract Services ................................... 26
c. Prohibitions on Expending FEMA Award Funds for Covered Telecommunications
Equipment or Services ................................................................................................... 26
d. Enhancing Critical Infrastructure Cybersecurity....................................................... 28
e. Pre-Award Costs........................................................................................................ 28
f. Management and Administration (M&A) Costs ....................................................... 28
g. Indirect Facilities & Administrative (F&A) Costs .................................................... 28
E. Application Review Information........................................................................................... 29
1. Application Evaluation Criteria ..................................................................................... 29
a. Programmatic Criteria for Mitigation Plan Requirement.......................................... 29
b. Financial Integrity Criteria ........................................................................................ 30
c. Supplemental Financial Integrity Criteria and Review ............................................. 31
2. Review and Selection Process ....................................................................................... 31
F. Federal Award Administration Information.......................................................................... 32
1. Notice of Award............................................................................................................. 32
2. Pass-Through Requirements .......................................................................................... 32
3. Administrative and National Policy Requirements........................................................ 33
a. DHS Standard Terms and Conditions ....................................................................... 33
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
5
b. Ensuring the Protection of Civil Rights .................................................................... 33
c. Environmental Planning and Historic Preservation (EHP) Compliance................... 34
d. Good Jobs .................................................................................................................. 35
4. Reporting........................................................................................................................ 35
a. Financial Reporting Requirements............................................................................ 36
b. Programmatic Performance Reporting Requirements ............................................... 36
c. Closeout Reporting Requirements............................................................................. 37
d. Additional Reporting Requirements .......................................................................... 39
5. Monitoring and Oversight.............................................................................................. 40
G. DHS Awarding Agency Contact Information ....................................................................... 41
1. Contact and Resource Information ................................................................................ 41
a. Program Office Contact............................................................................................. 41
FEMA Grants News....................................................................................................... 41
c. Grant Programs Directorate (GPD) Award Administration Division ....................... 41
d. FEMA Regional Offices ............................................................................................ 42
e. Equal Rights .............................................................................................................. 43
f. Environmental Planning and Historic Preservation .................................................. 43
2. Systems Information ...................................................................................................... 43
a. Grants.gov ................................................................................................................. 43
b. Payment and Reporting System (FEMA GO) ........................................................... 43
c. FEMA Grant Outcomes (GO) ................................................................................... 43
H. Additional Information.......................................................................................................... 44
I. Termination Provisions.................................................................................................. 44
a. Noncompliance.......................................................................................................... 44
b. With the Consent of the Recipient ............................................................................ 44
c. Notification by the Recipient .................................................................................... 44
2. Program Evaluation.......................................................................................................... 44
3. Period of Performance Extensions................................................................................. 45
4. Disability Integration....................................................................................................... 46
5. Conflicts of Interest in the Administration of Federal Awards or Subawards............... 47
6. Procurement Integrity .................................................................................................... 47
a. Important Changes to Procurement Standards in 2 C.F.R. Part 200 ......................... 48
b. Competition and Conflicts of Interest ....................................................................... 48
c. Supply Schedules and Purchasing Programs............................................................. 50
d. Procurement Documentation ..................................................................................... 51
7. FEMA Financial Assistance Programs for Infrastructure ................................................ 52
Build America, Buy America Act.................................................................................. 52
8. Record Retention ........................................................................................................... 53
a. Record Retention Period ........................................................................................... 53
b. Types of Records to Retain ....................................................................................... 54
9. Actions to Address Noncompliance............................................................................... 55
10. Audits............................................................................................................................. 56
11. Payment Information ..................................................................................................... 57
12. Whole Community Preparedness................................................................................... 57
13. Example Mitigation Plan Extension Request Template.................................................. 58
14. Examples Using Funding Formula.................................................................................. 59
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
6
15. Determination of Unacceptable Risk to the Public ......................................................... 61
16. Eligible Activities............................................................................................................ 61
17. Floodplain Management Plan.......................................................................................... 63
18. Definitions ....................................................................................................................... 65
19. Appendices ..................................................................................................................... 67
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
7
A. Program Description
1. Issued By
U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency
(FEMA)/ Resilience, Risk Management Directorate/Planning, Safety and Building Science
Division / Planning and Safety Branch, National Dam Safety Program Office (NDSP)
2. Assistance Listings Number
97.041
3. Assistance Listings Title
National Dam Safety Program
4. Funding Opportunity Title
Fiscal Year 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD)
5. Funding Opportunity Number
DHS-24-[MT]-[041]-[00]-[98]
6. Authorizing Authority for Program
National Dam Safety Program Act (Public Law No. 92-367, as amended, 33 U.S.C. § 467f-2)
7. Appropriation Authority for Program
Infrastructure Investment and Jobs Act, Division J, Title V, Protection, Preparedness,
Response, and Recovery, Federal Emergency Management Agency, Federal Assistance
(Public Law No. 117-58)
8. Announcement Type
Initial
9. Program Category
Mitigation
10. Program Overview, Objectives, and Priorities
a. Overview
FEMA’s National Dam Safety Program (NDSP) is committed to protecting lives and property
from the risks associated with dams. Under NDSP, the Rehabilitation of High Hazard Potential
Dams (HHPD) Grant Program makes available federal funds to eligible states for pass through to
non-Federal governmental organizations or nonprofit organizations for the rehabilitation of
eligible high hazard potential dams that fail to meet minimum state dam safety standards and
pose unacceptable risk to life and property.
For the purposes of the HHPD Grant Program, rehabilitation means the repair, replacement,
reconstruction, or removal of a dam that is carried out to meet applicable state dam safety and
security standards.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
8
The Fiscal Year 2024 Fall HHPD grant is available to support two categories of funding:
(1) Project Scoping, Engineering and Design and (2) Construction Projects.
The HHPD grant program incentivizes eligible states to:
• Provide financial assistance for repair, removal, or rehabilitation of eligible high hazard
potential dams.
• Incorporate risk-informed analysis and decision making into their dam safety practice
and HHPD rehabilitation investments.
• Incorporate risk-analysis results and information and consider all dam risk in state,
local, tribal, and territorial mitigation planning.
• Promote community preparedness by requiring recipients to develop and implement
floodplain management plans that address potential measures, practices, and policies to
reduce loss of life, injuries, damage to property and facilities, public expenditures, and
other adverse effects of flooding.
• Reduce costs associated with dam rehabilitation through the deployment of innovative
solutions and technologies.
Given the requirements of this grant (e.g., National Flood Insurance Program participation,
state, and local hazard mitigation plans (HMP), floodplain management plan, risk
prioritization, state dam safety agency approval of the award), applicants must pursue this
grant in coordination with the State Dam Safety Officer and the State Hazard Mitigation
Officer, regardless of which entity will implement the grant. Contact information for the
State Hazard Mitigation Officers (SHMOs) is provided on the FEMA website at
http://www.fema.gov/state-hazard-mitigation-officers.
The HHPD supports DHS Strategic Goal 5: Strengthen Preparedness and Resilience,
Objective 5.1: Build a National Culture of Preparedness and Presidential Policy Directive 8:
Build and Sustain National Preparedness. Specifically, the HHPD supports Sub-Objective
5.1.1 of Strategic Goal 5 to incentivize investments that reduce risk and increase pre-disaster
mitigation, including expanding the use of insurance to manage risk. DHS Strategic Plan,
Fiscal years 2020-2024 has identified strengthening national preparedness and resilience as
one of the basic Homeland Security missions. This initiative supports this mission by
providing grant assistance for eligible high hazard potential dams that pose an unacceptable
risk to the public. This program also supports Goal 2: Lead Whole of Community in Climate
Resilience, Objective 2.3, Empower Risk-Informed Decision Making, of the 2022-2026
FEMA Strategic Plan.
b. Objectives
The objective of the program is to:
Reduce or eliminate risk of eligible high hazard potential dams.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
9
c. Priorities
For FY2024, the HHPD priorities are Rehabilitation Planning, Design, Re-construction, and
Removal activities for eligible high hazard dams.
11. Performance Measures
The following list provides Performance Measures aligned with Program Objectives and
associated eligible activities. Applicants may choose one or more activities from the list below.
Applicants may propose additional activities to support the program objectives; however,
applicants must discuss additional activities with the FEMA Program Officer for approval and
inclusion into the workplan.
Program Objective: Reduce or eliminate risk of eligible high hazard potential dam (HHPD)
Performance Measures
1.1 Planning tasks and activities, studies and analysis for pre-construction phases, scoping
activities, and permit applications.
Performance Measure 1.1: Number of eligible HHPD dams that have resulted in the
completion of studies and analysis for pre-construction phases, scoping activities, and
permit applications.
1.2 Preliminary and final design package and required permit approvals.
Performance Measure 1.2: Number of eligible HHPD dams that have resulted in the
completion of preliminary and final engineering design package and permits.
1.3 Construction activities that support dam rehabilitation or removal projects.
Performance Measure 1.3: Number of eligible HHPD dams that result in construction
projects for dam rehabilitation or removal.
Applicants are to establish Performance Measurement targets for activities submitted for funding
under this award. See Appendix A: FY24 Performance Measure Targets.
B. Federal Award Information
1. Available Funding for the NOFO: $185,120,000.00
The allocation of available HHPD grant funds is determined by 33 U.S.C § 467f-
2(g)(2) Allocation of Funds. The allocation of the HHPD funds is calculated as
follows:
(i) Equal distribution
One-third of the available funding will be distributed equally among states
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
10
in which the projects for which eligible applications are submitted are
located.
(ii) Need-based
Two-thirds of the available funding will be distributed among states in which
the projects for which eligible applications are submitted are located based on
the proportion that:
a. the number of eligible high hazard potential dams in the state; bears to
b. the number of eligible high hazard potential dams in all such states.
2. Projected Number of Awards: 50
3. Period of Performance: 36 Months
The Period of Performance (POP) is 36 months, starting on the date of the Recipient’s federal
award. Given the complexity of the HHPD projects, the Recipient may submit a request for an
extension to the period of performance, which is allowed under HHPD. For additional
information on period of performance extensions, please refer to Section H.3, Period of
Performance Extensions.
FEMA awards under most programs, including this program, only include one budget period, so
it will be same as the period of performance. See 2 Code of Federal Regulations § 200.1 for
definitions of “budget period” and “period of performance.”
4. Funding Instrument Type: Grant
C. Eligibility Information
1. Eligible Applicants
A state with a state dam safety program authorized by state legislation is the only entity
eligible to submit HHPD applications to DHS/FEMA.
For the purposes of the HHPD, the term “state” means each of the several states of the United
States, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands,
Guam, American Samoa, the Commonwealth of the Northern Mariana Islands, and any other
territory or possession of the United States.
2. Applicant Eligibility Criteria
Each eligible state must designate one State Administrative Agency (SAA) to serve as the
applicant for HHPD funding. Each SAA may submit only one (1) HHPD grant application to
FEMA and be able to comply with regulations associated with receipt of federal financial
contributions from FEMA.
Each Recipient must have a FEMA-approved state mitigation plan that includes all dam
risks; and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat.
1552) that amended the Robert T. Stafford Disaster Relief and Emergency Assistance Act,
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
11
PL 100-707. For more information on the Mitigation Plan Requirements, see Section E.1.a,
Programmatic Criteria for Mitigation Plan Requirement. For links to mitigation plan
guidance documents and for questions, see Section H.12., Mitigation Plan Requirement
Resources.
3. Subrecipient Eligibility Criteria
Eligible subrecipients under Fiscal Year 2024 HHPD are non-federal governmental
organizations (other than the designated applicant) and nonprofit organizations. Under FY
2024 HHPD, eligible subrecipients apply for and receive subawards directly from the SAA.
Subrecipients must meet the following criteria to be eligible:
a. Acts in accordance with the state dam safety program. Additionally, the project dam must
be regulated by the state dam safety program. All activities must be approved by the state
dam safety agency. Any engineering studies, plans, or design drawings and specifications
must be approved, signed, and stamped by a qualified design professional registered in the
state in which the project is located.
b. The community in which the dam is located participates in, and complies with, all
applicable regulations of the National Flood insurance Program, and is in good standing, not
on probation, suspended, or withdrawn from such Program.
c. The Tribal or local government with jurisdiction over the area in which the dam is located
has in place an approved hazard mitigation plan that includes all dam risks and complies with
the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). For more
information on the Mitigation Plan Requirements, see Section E.1.a., Programmatic Criteria
for Mitigation Plan Requirement. If the Tribal or local mitigation plan does not include all
dam risks, the subrecipient may request an extension to meet this requirement. For more
information on the Mitigation Plan Requirements, see Section H.13, Mitigation Plan
Requirement Extension Requests. For links to mitigation plan guidance documents and for
questions, see Section H.12., Mitigation Plan Requirement Resources.
(FEMA’s Mitigation Planning Program defines “local government” as any county,
municipality, city, town, township, public authority, school district, special district, intrastate
district, council of governments (regardless of whether the council of governments is
incorporated as a nonprofit corporation under State law), regional or interstate government
entity, or agency or instrumentality of a local government; any Indian tribe or authorized
tribal organization, or Alaska Native village or organization; and any rural community,
unincorporated town or village, or other public entity” (44 Code of Federal Regulations §
201.2).)
d. Commit to provide operation and maintenance of the project for the expected life of the
dam following completion of rehabilitation.
e. Carries out activities relating to the public in the area around the dam in accordance with
the hazard mitigation plan.
f. Complies with section 5196(j)(9) of title 42 of the U.S. Code (as in effect on December 16,
2016) with respect to projects receiving assistance under this section in the same manner as
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
12
recipients are required to comply in order to receive financial contributions from the
Administrator for emergency preparedness purposes. See Section D.13.a., Requirements
Related to Contractor and Subcontractor Wages, for additional information.
g. Complies with chapter 11 of the title 40, Selection of Architects and Engineers. (See
Section D.13.b., Requirements Related to Contract and Subcontract Services.)
h. Have in place (or will be developed not later than 2 years after the date of execution of a
dam rehabilitation or removal project agreement and implemented not later than 2 years after
the date of completion of a project) a floodplain management plan to reduce the impacts of
future flood events in the area impacted by the project. The floodplain management plan
shall address:
1. potential measures, practices, and policies to reduce loss of life, injuries, damage to
property and facilities, public expenditures, and other adverse impacts of flooding in the
area protected by the project.
2. plans for flood fighting and evacuation; and
3. public education and awareness of flood risks.
For additional information, please see Section H.17., Floodplain Management Plan.
i. For the purposes of the HHPD program, all dam risk includes the incremental risk, non-
breach risk, and residual risk associated with each eligible high hazard potential dam, as well
as the reason(s) the state has determined the dam is an eligible high hazard potential dam.
For the purposes of meeting the mitigation planning requirements, Applicants (SAA) must
address the requirements for state mitigation plans and subrecipients / jurisdictions where the
dam is located must address the requirements for local or tribal mitigation plans as set forth
in mitigation planning policies. The requirements include the planning process, risk
assessment, goals, and mitigation strategy. In the mitigation planning risk assessment,
including all dam risks is done at a scale appropriate to the planning area and should include
descriptions of incremental, breach, and non-breach risks for high hazard potential dams (not
limited to eligible) as described in Section 5.8 of the Rehabilitation of High Hazard Potential
Dams Grant Program Guidance (June 2020) FEMA Policy FP 104-008-7. “
j. Bipartisan Infrastructure Law (BIL) Signage
FEMA encourages the use of public signage for Bipartisan Infrastructure Law funded
projects. Please note, these actions highly are encouraged but are not required.
Subrecipients are encouraged to place signs at project sites identifying the funding source of
the project. The cost of such signs is an eligible project cost. Sub applicants may request up
to $10,000 per project for costs relating to signage. Project costs for signage are subject to the
applicable cost-sharing requirements. For assistance with template design, please email:
design@fema.dhs.gov.
4. Other Program-Specific Eligibility Criteria
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
13
a. Approved Hazard Mitigation Plan
The state must have in place (by the application deadline and at the time of obligation of
grant funds) an approved state hazard mitigation plan that includes all dam risks (See Section
H.19., Definitions, for the definition of All Dam Risk) and complies with the Disaster
Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552). If an HHPD applicant does
not have a state mitigation plan that includes all dam risks, the applicant may request an
extension to meet this requirement. (See Section H.13., Mitigation Plan Requirement
Extension Requests).
b. Allowable Activities
See Section H.17., Eligible Activities, for more information on allowable activities. See
Section D.13.b., Requirements Related to Contract and Subcontract Services, for information
about funding restrictions.
At project sites where BIL funding is being used for hazard mitigation projects, the use of
public signage is a way to inform taxpayers about how BIL funds are being spent and
advance the goals of accountability and transparency in federal spending. For more
information on the federal government’s signage initiative relating to infrastructure
investments, see the Office of Management and Budget’s February 24, 2023, Controller
Alert, “CA-23-6, Enhancing Transparency Through Use of the Investing in America Emblem
on Signs (UPDATED).” Additionally, for construction projects that are not funded by the
BIL, publicly visible signage identifying the National Dam Safety Program HHPD funding
source of the project promotes public awareness, participation in the program, and
investment in building a resilient nation.
c. List of Eligible High Hazard Dams
The SAA must submit a list of all eligible high hazard potential dams in their state with the
application. The SAA must submit an official assurance statement (signed by the State Dam
Safety Officer or Governor's Authorized Representative [GAR]) that all dams included on
the list of eligible high hazard potential dams are regulated by the state dam safety program
and meet the following HHPD criteria for eligible high hazard potential dams.
A dam considered as eligible under grant must meet the following criteria:
“(A) In general, the term “eligible high hazard potential dam” means a non-Federal dam
that—
(i) is located within a state with a state dam safety program and regulated under that
state dam safety program;
(ii) is classified as high hazard potential by the relevant state dam safety agency;
(iii) has an emergency action plan that—
I. is approved by the relevant state dam safety agency; or
II. is in conformance with state law and pending approval by the relevant state dam
safety agency;
(iv) fails to meet minimum dam safety standards of the state in which the dam is
located, as determined by the state dam safety agency;
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
14
(v) and has a condition assessment rating of POOR or UNSATISFACTORY as
identified in the National Inventory of Dams (NID) no later than 09/15/2023.
(B) Exclusion The term “eligible high hazard potential dam” does not include—
(i) a licensed hydroelectric dam under a hydropower project with an authorized
installed capacity of greater than 1.5 megawatts; or
(ii) a dam built under the authority of the Secretary of Agriculture.”
33 U.S.C. § 467(4)(A)
Note: Dams with FAIR condition assessment in the NID (with a population at risk (PAR)
of less than 1000) may be eligible for the HHPD program. See Section d. List of Eligible
High Hazard Dams Template, below for more details. Dams with a SATISFACTORY or
NOT RATED condition assessment in the NID are not eligible for the HHPD program.
HHPD Prioritization Tool
The FEMA project prioritization tool is an Excel-based tool developed specifically for the
HHPD grants. This screening level tool requires input from the NID and data available from
other state sources such as inspection reports. The tool assists in the estimation of the
likelihood of failure for static, hydrologic, and seismic failure modes based on existing
deficiencies and the change in likelihood of failure by removing the deficiencies and bringing
the dam in compliance with state standards.
The HHPD priority system process requires that dams under consideration for HHPD
funding be plotted on a HHPD risk matrix with the likelihood of failure from the FEMA
project prioritization tool on the vertical axis and the PAR calculated using the US Army
Corps of Engineers Dam Screening Tool (DST) plotted on the horizonal axis of the risk
matrix. Comparing the dams based on likelihood of failure and PAR consequences provide a
ranking of dams consistent with the intent of the Act.
If the SAA chooses to be a pass-through entity, the SAA must contact potential subrecipients
to identify potential eligible subrecipients with an eligible dam who express interest in
obtaining a grant for a specific planning or design project and are capable of meeting the
requirements of the HHPD grant. See Section H.17., Eligible Activities, for information on
Eligible Activities.
The list or prospective eligible dams will be used to allocate grant funds to the state. See
Section H.15., Example Using the Funding Formula, for a sample calculation on how
eligible dams is used for state grant allocations.
Upon request, the SAA must provide to FEMA substantiating documentation that documents
dams submitted are eligible under the HHPD grant. The requested documentation may
include, but is not limited to, copies of the regulatory notices, risk assessments, engineering
analyses, etc.
d. List of Eligible High Hazard Dams Template
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
15
The list of dams must be submitted in table format with NID Data and must include the
below column row headers and must be signed by the State Dam Safety Agency or GAR:
• Does the state have a state dam safety program?
• Dam Name
• NID ID
• Longitude
• Latitude
• Hazard Potential
• State Approved EAP? (Y/N)
• EAP Date
• Owner Type
• Built by USDA/NRCS? (Y/N)
• Licensed by FERC? (Y/N)
• NID Condition Assessment*
• Fails to Meet Minimum State Dam Safety Standards
• Dam has a documented Dam Safety Deficiency? **
• Was Dam Safety Deficiency caused by lack of Routine Operation and Maintenance?
• Was Dam Safety Deficiency caused by Deferred Maintenance?
• Brief Description of Deficiency
• Name of potential Subrecipient that has indicated interest in HHPD and is capable of
meeting HHPD requirements***
* FEMA will review the Condition Assessment data reported in the NID to validate a dam’s
eligibility on 09/15/2023. Dams that meet the NID criteria for POOR or
UNSATISFACTORY condition assessments may be eligible to include on the list of eligible
high hazard potential dams. Also dams that meet the NID criteria of FAIR and with a PAR
greater than or equal to 1000 may be eligible. Upon request, the SAA must provide to
FEMA substantiating documentation that verify dams submitted are eligible under the HHPD
grant. The requested documentation may include, but is not limited to, copies of the
regulatory notices, risk assessments, engineering analyses, etc.
**Dam Safety Deficiency (Source NID): A load capacity limit or other issue that can result
in a failure of the dam or appurtenant structure. It is a characteristic or condition that does not
meet the applicable minimum regulatory criteria.
*** the SAA must contact potential subrecipients to identify potential eligible subrecipients
with an eligible dam who express interest in obtaining a grant for a specific planning or
design project and are capable of meeting the requirements of the HHPD grant. (Only fill out
this field if the potential subrecipient has been contacted or is the SAA.)
5. Cost Share or Match
Assistance provided under the HHPD grant is subject to a non-Federal cost-sharing requirement
of not less than 35 percent. Federal funding is available for up to 65 percent of the eligible
activity costs. The remaining 35 percent of eligible activity costs must be derived from non-
federal sources, which may be in-kind. Requirements for cash and third-party in-kind
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
16
contributions can be found in 2 Code of Federal Regulations § 200.306. The non-Federal cost
share contribution is not limited to 65 percent.
The non-federal cost share contribution is calculated based on the total cost of the proposed
activity. The calculation to determine the non-Federal Cost share is:
Non-Federal Share = [0.35*(Federal Share)]/(0.65).
For example, if the total cost is $400,000 and the non-Federal cost share is 35 percent, then
the non-federal contribution is $140,000: 35 percent of $400,000 is $140,000. The federal
share cannot exceed $260,000 ($400,000 x 65%).
D. Application and Submission Information
1. Key Dates and Times
a. Application Start Date: 11/06/2023 at 09:00:00 AM ET
b. Application Submission Deadline: 02/29/2024 at 05:00:00 PM ET
All applications must be received by the established deadline.
FEMA’s Grants Outcomes System (FEMA GO) automatically records proof of timely
submission and the system generates an electronic date/time stamp when FEMA GO
successfully receives the application. The individual with the Authorized Organization
Representative role that submitted the application will also receive the official date/time
stamp and a FEMA GO tracking number in an email serving as proof of their timely
submission. For additional information on how an applicant will be notified of application
receipt, see the subsection titled “Timely Receipt Requirements and Proof of Timely
Submission” in Section D of this NOFO.
FEMA will not review applications that are received after the deadline or consider
these late applications for funding. FEMA may, however, extend the application deadline
on request for any applicant who can demonstrate that good cause exists to justify extending
the deadline. Good cause for an extension may include technical problems outside of the
applicant’s control that prevent submission of the application by the deadline, other exigent
or emergency circumstances, or statutory requirements for FEMA to make an award.
Applicants experiencing technical problems outside of their control must notify FEMA
as soon as possible and before the application deadline. Failure to timely notify FEMA of
the issue that prevented the timely filing of the application may preclude consideration of the
award. “Timely notification” of FEMA means: prior to the application deadline and within
48 hours after the applicant became aware of the issue.
A list of FEMA contacts can be found in Section G of this NOFO, “DHS Awarding Agency
Contact Information.” For additional assistance using the FEMA GO System, please contact the
FEMA GO Service Desk at 1-877-585-3242 or FEMAgo@fema.dhs.gov. The FEMA GO
Service Desk is available Monday through Friday, 9:00 AM – 6:00 PM Eastern Time (ET). For
programmatic or grants management questions, please contact your Program Analyst or Grants
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
17
Specialist. FEMA Grants News is a non-emergency comprehensive management and
information resource developed by FEMA for grants stakeholders. This channel provides general
information on all FEMA grant programs and maintains a comprehensive database containing
key personnel contact information at the federal, state, and local levels. When necessary,
recipients will be directed to a federal point of contact who can answer specific programmatic
questions or concerns. FEMA Grants Information Desk can be reached by e-mail at fema-grants-
news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9:00 AM – 5:00
PM ET.
c. Anticipated Funding Selection Date: No later than 03/25/2024
d. Anticipated Award Date: No later than 04/08/2024
e. Other Key Dates
Event Suggested Deadline for Completion
Obtaining Unique Entity Identifier
(UEI) number
Four weeks before actual submission deadline
Obtaining a valid Employer
Identification Number (EIN) Four weeks before actual submission deadline
Creating an account with login.gov Four weeks before actual submission deadline
Registering in SAM or updating
SAM registration Four weeks before actual submission deadline
Registering Organization in FEMA
GO Prior to beginning application
Submitting complete application in
FEMA GO One week before actual submission deadline
2. Agreeing to Terms and Conditions of the Award
By applying, applicants agree to comply with the requirements of this NOFO and the terms
and conditions of the award, should they receive an award.
3. Address to Request Application Package
Applications are processed through the FEMA GO system. To access the system, go to
https://go.fema.gov/.
Hard copies of the NOFO can be downloaded at Grants.gov or obtained via email from the
Awarding Office points of contact listed in Section G of this NOFO, “DHS Awarding
Agency Contact Information” or by TTY (800) 462-7585.
4. Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award
Management (SAM), and Submit an Application
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
18
Applying for an award under this program is a multi-step process and requires time to
complete. Applicants are encouraged to register early as the registration process can take four
weeks or more to complete. Therefore, registration should be done in sufficient time to
ensure it does not impact your ability to meet required submission deadlines.
Requirements: Obtain a Unique Entity Identifier (UEI) and Register in the System for Award
Management (SAM)
Each applicant, unless they have a valid exception under 2 CFR 25.110, must:
1) Be registered in Sam.Gov before application submission.
2) Provide a valid Unique Entity Identifier (UEI) in its application.
3) Continue to always maintain an active System for Award Management (SAM) registration
with current information during the Federal Award process. "
Please review the table above for estimated deadlines to complete each of the steps listed.
Failure of an applicant to comply with any of the required steps before the deadline for
applying may disqualify that application from funding.
To apply for an award under this program, all applicants must:
a. Apply for, update, or verify their Unique Entity Identifier (UEI) number and Employer
Identification Number (EIN) from the Internal Revenue Service;
b. In the application, provide an UEI number;
c. Have an account with login.gov;
d. Register for, update, or verify their SAM account and ensure the account is active before
submitting the application;
e. Register in FEMA GO, add the organization to the system, and establish the Authorized
Organizational Representative (AOR). The organization’s electronic business point of
contact (eBiz POC) from the SAM registration may need to be involved in this step. For
step-by-step instructions, see https://www.fema.gov/media-
library/assets/documents/181607;
f. Submit the complete application in FEMA GO; and
g. Continue to maintain an active SAM registration with current information at all times
during which it has an active federal award or an application or plan under consideration
by a federal awarding agency. As part of this, applicants must also provide information
on an applicant’s immediate and highest-level owner and subsidiaries, as well as on all
predecessors that have been awarded federal contracts or federal financial assistance
within the last three years, if applicable.
Applicants are advised that FEMA may not make a federal award until the applicant has
complied with all applicable SAM requirements. Therefore, an applicant’s SAM registration
must be active not only at the time of application, but also during the application review
period and when FEMA is ready to make a federal award. Further, as noted above, an
applicant’s or recipient’s SAM registration must remain active for the duration of an active
federal award. If an applicant’s SAM registration is expired at the time of application, expires
during application review, or expires any other time before award, FEMA may determine
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
19
that the applicant is not qualified to receive a federal award and use that determination as a
basis for making a federal award to another applicant.
Per 2 C.F.R. § 25.110(c)(2)(iii), if an applicant is experiencing exigent circumstances that
prevents it from obtaining an UEI number and completing SAM registration prior to
receiving a federal award, the applicant must notify FEMA as soon as possible by contacting
FireGrants@fema.dhs.gov and providing the details of the circumstances that prevent
completion of these requirements. If FEMA determines that there are exigent circumstances
and FEMA has decided to make an award, the applicant will be required to obtain an UEI
number, if applicable, and complete SAM registration within 30 days of the federal award
date.
5. Electronic Delivery
DHS is participating in the Grants.gov initiative to provide the grant community with a single
site to find and apply for grant funding opportunities. DHS encourages or requires applicants
to submit their applications online through Grants.gov, depending on the funding
opportunity.
For this funding opportunity, FEMA requires applicants to submit applications through
FEMA GO.
6. How to Register to Apply
a. General Instructions:
Registering and applying for an award under this program is a multi-step process and
requires time to complete. Read the instructions below about registering to apply for FEMA
funds. Applicants should read the registration instructions carefully and prepare the
information requested before beginning the registration process. Reviewing and assembling
the required information before beginning the registration process will alleviate last-minute
searches for required information.
The registration process can take up to four weeks to complete. To ensure an application
meets the deadline, applicants are advised to start the required steps well in advance of their
submission.
Organizations must have a Unique Entity Identifier (UEI) number, Employer Identification
Number (EIN), and an active System for Award Management (SAM) registration.
b. Obtain a UEI Number:
All entities applying for funding, including renewal funding, must have a UEI number.
Applicants must enter the UEI number in the applicable data entry field on the SF-424 form.
For more detailed instructions for obtaining a UEI number, refer to SAM.gov.
c. Obtain Employer Identification Number:
In addition to having a UEI number, all entities applying for funding must provide an
Employer Identification Number (EIN). The EIN can be obtained from the IRS by visiting
https://www.irs.gov/businesses/small-businesses-self-employed/apply-for-an-employer-
identification-number-ein-online.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
20
d. Create a login.gov account:
Applicants must have a login.gov account in order to register with SAM or update their SAM
registration. Applicants can create a login.gov account here:
https://secure.login.gov/sign_up/enter_email?request_id=34f19fa8-14a2-438c-8323-
a62b99571fd.
Applicants only have to create a login.gov account once. For applicants that are existing
SAM users, use the same email address for the login.gov account as with SAM.gov so that
the two accounts can be linked.
For more information on the login.gov requirements for SAM registration, refer to
https://www.sam.gov/SAM/pages/public/loginFAQ.jsf.
e. Register with SAM:
In addition to having a UEI number, all organizations must register with SAM. Failure to
register with SAM will prevent your organization from applying through FEMA GO. SAM
registration must be renewed annually and must remain active throughout the entire grant life
cycle.
For more detailed instructions for registering with SAM, refer to
https://www.grants.gov/web/grants/applicants/organization-registration/step-2-register-with-
sam.html.
Note: As a new requirement per 2 C.F.R. § 25.200, applicants must also provide the
applicant’s immediate and highest-level owner, subsidiaries, and predecessors that have been
awarded federal contracts or federal financial assistance within the past three years, if
applicable.
I. ADDITIONAL SAM REMINDERS
Existing SAM.gov account holders should check their account to make sure it is
“ACTIVE.” SAM registration should be completed at the very beginning of the
application period and should be renewed annually to avoid being “INACTIVE.”
Please allow plenty of time before the grant application submission deadline to
obtain a UEI number and then to register in SAM. It may be four weeks or more
after an applicant submits the SAM registration before the registration is active
in SAM, and then it may be an additional 24 hours before FEMA’s system
recognizes the information.
It is imperative that the information applicants provide is correct and current. Please
ensure that your organization’s name, address, UEI number, and Employer
Identification Number, or EIN, are up to date in SAM and that the UEI number used
in SAM is the same one used to apply for all other FEMA awards. Payment under any
FEMA award is contingent on the recipient’s having a current SAM registration.
II. HELP WITH SAM
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
21
The SAM quick start guide for new recipient registration and SAM video tutorial for
new applicants are tools created by the General Services Administration (GSA) to
assist those registering with SAM. If applicants have questions or concerns about a
SAM registration, please contact the Federal Support Desk at
https://www.fsd.gov/fsd-gov/home.do or call toll free (866) 606-8220 Monday -
Friday 8 a.m. to 8 p.m. ET.
f. Register in FEMA GO, Add the Organization to the System, and Establish the AOR:
Applicants must register in FEMA GO and add their organization to the system. The
organization’s electronic business point of contact (eBiz POC) from the SAM registration
may need to be involved in this step. For step-by-step instructions, see FEMA GO Startup
Guide.
Note: FEMA GO will support only the most recent major release of the following browsers:
• Google Chrome;
• Internet Explorer;
• Mozilla Firefox;
• Apple Safari; and
• Microsoft Edge.
Users who attempt to use tablet type devices or other browsers may encounter issues with
using FEMA GO.
7. Submitting the Application
Applicants will be prompted to submit the standard application information and any
program-specific information required as described in Section D.10 of this NOFO, “Content
and Form of Application Submission.” The Standard Forms (SF) may be accessed in the
Forms tab under the SF-424 family on Grants.gov. Applicants should review these forms
before applying to ensure they have all the information required.
After submitting the application, FEMA GO will provide either an error message or a
successfully received transmission in the form of an email sent to the Authorized
Organization Representative that submitted the application. Applicants using slow internet
connections, such as dial-up connections, should be aware that transmission can take some
time before FEMA GO receives your application.
For additional application submission requirements, including program-specific
requirements, please refer to the subsection titled “Content and Form of Application
Submission” under Section D of this NOFO.
8. Timely Receipt Requirements and Proof of Timely Submission
All applications must be completed in FEMA GO by the application deadline. FEMA GO
automatically records proof of timely submission and the system generates an electronic
date/time stamp when FEMA GO successfully receives the application. The individual with
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
22
the Authorized Organization Representative (AOR) role that submitted the application will
also receive the official date/time stamp and a FEMA GO tracking number in an email
serving as proof of their timely submission on the date and time that FEMA GO received the
application.
Applicants who experience system-related issues will be addressed until 3:00 PM ET on
the date applications are due. No new system-related issues will be addressed after this
deadline. Applications not received by the application submission deadline will not be
accepted.
9. Content and Form of Application Submission
a. Standard Required Application Forms and Information
The following forms or information are required to be submitted via FEMA GO. The
Standard Forms (SF) are also available at https://www.grants.gov/web/grants/forms/sf-424-
family.html.
SF-424, Application for Federal Assistance
Grants.gov Lobbying Form, Certification Regarding Lobbying
SF-424A, Budget Information (Non-Construction)
• For construction under an award, submit SF-424C, Budget Information
(Construction), in addition to or instead of SF-424A
SF-424B, Standard Assurances (Non-Construction)
• For construction under an award, submit SF-424D, Standard Assurances
(Construction), in addition to or instead of SF-424B
SF-LLL, Disclosure of Lobbying Activities
Indirect Cost Agreement or Proposal if the budget includes indirect costs and the
applicant is required to have an indirect cost rate agreement or proposal. If the applicant
does not have or is not required to have an indirect cost rate agreement or proposal,
please see Section D.13 of this NOFO, “Funding Restrictions and Allowable Costs,” for
further information regarding allowability of indirect costs and whether alternatives to an
indirect cost rate agreement or proposal might be available, or contact the relevant
FEMA staff identified in Section G of this NOFO, “DHS Awarding Agency Contact
Information” for further instructions.
Generally, applicants have to submit either the non-construction forms (i.e., SF-424A and
SF-424B) or construction forms (i.e., SF-424C and SF-424D), meaning that applicants that
only have construction work and do not have any non-construction work need only submit
the construction forms (i.e., SF-424C and SF-424D) and not the non-construction forms (i.e.,
SF-424A and SF-424B), and vice versa. However, applicants who have both construction
and non-construction work under this program need to submit both the construction and non-
construction forms.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
23
b. Program-Specific Required Forms and Information
The following program-specific forms or information are required to be submitted in
National Dam Safety Rehabilitation of High Hazard Potential Dams grant:
Contact your NDSP Program Officer for templates to submit Program-Specific Information.
The following program-specific forms or information are required to be submitted in:
The SAA must include the following five documents in the initial application package—each
document must be labeled and numbered. At the top of each document provide the following:
• State/Agency Name
• FY24 FALL HHPD
• Name and contact information (completing documents)
• Date
The following program-specific forms or information are required to be submitted in
FEMA GO:
1. List of eligible high hazard potential dams, including National Inventory of Dams (NID)
ID Identifiers, in their state with the application. The SAA or GAR should sign a statement
that the list of eligible high hazard potential dams has been reviewed and approved. See
Section C.4.c., List of Eligible High Hazard Potential Dams, for eligibility requirements
and Section C.4.d., List of Eligible High Hazard Potential Dams Template, for an
example table template for submittal.
2. Proposed Budget and HHPD proposed projects/activities: Indicate and describe proposed
activities: (1) project scoping and engineering design, and or (2) construction (clearly
indicate if project includes repair, rehabilitation, or removal). Include a brief project
narrative on how the funds will advance HHPD priorities and meet performance goals and
include:
a. Proposed Budget
b. Percent of cost share: Submit the cost share and a summary of in-kind activities. See
Section C.5., Cost Share or Match, for requirements.
3. Statement of assurances signed by authorized state official
a. Statement and date of FEMA approval of state HMP which includes all-dam risk (insert
ref/policy)
b. Statement the applicant is able to comply with regulations associated with receipt of
federal financial contributions from FEMA.
c. If Pass-through Entity: Assurance statement that subrecipients will meet all criteria listed
in Section C.3., Subrecipient Eligibility Criteria.
d. Assurance statement that the 35 percent cost share requirement can be met. See Section
C.5., Cost Share or Match, for requirements.
4. State Administrative Plan.
At a minimum, the State Administrative Plan must include the items listed below:
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
24
a. Designation of the SAA responsible for program administration.
b. Identification of the State Official responsible for financial and program matters related to
the High Hazard Potential Dam Rehabilitation Grant Program
c. Timely submission of HHPD quarterly performance progress reports on approved
projects.
d. Determination of staffing requirements and sources of staff necessary for
administration of the program.
e. If applicable, the establishment of procedures as a Pass-through Entity:
1. Identify, select, and notify potential subrecipients of the availability of the program.
2. Ensure that potential subrecipients are provided information on the application process,
program eligibility, including the requirement for an approved mitigation plan that
includes all dam risks for the jurisdiction where the dam is located, and key deadlines.
3. Determine subrecipient eligibility, including the requirement for an approved
mitigation plan for the jurisdiction where the dam is located.
4. Submit revisions or amendments for FEMA review and approval. See Section F.2,
Pass-Through Requirements.
5. Conduct environmental and floodplain management reviews.
6. Establish priorities for selection of projects.
7. Process requests for advances of funds and reimbursement.
8. Monitor and evaluate the progress and completion of the selected projects.
9. Review and approve cost overruns.
10. Process appeals.
11. Provide technical assistance as required to subrecipient(s) and/or jurisdiction where the
dam is located including coordination with State Hazard Mitigation Officer regarding the
eligibility requirement to have an approved mitigation plan that includes all dam risks and
complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552).
For more information on the Mitigation Plan Requirements, see Section E.1., Application
Evaluation Criteria.
12. Comply with the administrative and audit requirements of 2 Code of Federal Regulations
Part 200.
10. Other Submission Requirements
Fair Wages and Labor Standards: Regarding payment of laborers and mechanics employed
by contractors or subcontractors in the performance of construction work financed with the
assistance of any contribution of Federal funds. Section 5196(j)(9) of the US Code of Laws
Title 42.
For a grant of an amount greater than $1,000,000, an eligible subrecipient that receives the
grant shall require that each contract and subcontract for program management, construction
management, planning studies, feasibility studies, architectural services, preliminary
engineering, design, engineering, surveying, mapping, and related services entered into using
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
25
funds from the grant be awarded in the same manner as a contract for architectural and
engineering services is awarded under—
(A) chapter 11 of title 40; or
(B) an equivalent qualifications-based requirement prescribed by the relevant State.
11. Intergovernmental Review
An intergovernmental review may be required. Applicants must contact their state’s Single
Point of Contact (SPOC) to comply with the state’s process under Executive Order 12372
(See https://www.archives.gov/federal-register/codification/executive-order/12372.html;
www.whitehouse.gov/wp-content/uploads/2020/04/SPOC-4-13-20.pdf .
12. Funding Restrictions and Allowable Costs
All costs charged to awards covered by this NOFO must comply with the Uniform
Administrative Requirements, Cost Principles, and Audit Requirements at 2 C.F.R. Part 200,
unless otherwise indicated in the NOFO, or the terms and conditions of the award. This
includes, among other requirements, that costs must be incurred, and products and services
must be delivered, within the period of performance of the award. See 2 C.F.R. § 200.403(h)
(referring to budget periods, which for FEMA awards is the same as the period of
performance).
In general, the Cost Principles establish standards for the allowability of costs, provide
detailed guidance on the cost accounting treatment of costs as direct or administrative costs,
and set forth allowability principles for selected items of cost. More specifically, except as
otherwise stated in this NOFO, the terms and condition of an award, or other program
materials, costs charged to awards covered by this NOFO must be consistent with the Cost
Principles for Federal Awards located at 2 C.F.R. Part 200, Subpart E. In order to be
allowable, all costs charged to a FEMA award or applied to the cost share must be reasonable
in nature and amount and allocable to the particular FEMA award.
Additionally, all costs charged to awards must comply with the grant program’s applicable
statutes, policies, requirements in this NOFO as well as with the terms and conditions of the
award. If FEMA staff identify costs that are inconsistent with any of these requirements,
these costs may be disallowed, and FEMA may recover funds as appropriate, consistent with
applicable laws, regulations, and policies.
As part of those requirements, grant recipients and subrecipients may only use federal funds
or funds applied to a cost share for the purposes set forth in this NOFO and the terms and
conditions of the award, and those costs must be consistent with the statutory authority for
the award.
Grant funds may not be used for matching funds for other federal grants/cooperative
agreements, lobbying, or intervention in federal regulatory or adjudicatory proceedings. In
addition, federal funds may not be used to sue the federal government or any other
government entity.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
26
HHPD recipients may only fund activities and projects that are included and approved in the
FY 2024 HHPD Work Plan and Budget. See Section H.17., Eligible Activities, for a
description of eligible activities. See Section D.10., Content and Form of Application
Submission, for Work Plan requirements.
The maximum amount of funding any Subrecipient can receive under HHPD is statutorily
limited. The maximum subrecipient funding cannot exceed the lesser of 12.5 percent of the
total amount of funds made available.
For the FY 2024 program, $185,120,000.00 is allocated to the HHPD program; therefore, no
subrecipient may receive an award for more than $7,500,000.00. See Section H.15.,
Examples Using Funding Formula.
a. Requirements Related to Contractor and Subcontractor Wages
Per 33 U.S.C. § 467f-2(d)(2)(E), recipients and subrecipients are required to comply with the
requirements of 42 U.S.C. § 5196(j)(9). All laborers and mechanics employed by contractors
or subcontractors in the performance of construction work financed with the assistance of
any contribution of Federal funds made by the Administrator under this subsection shall be
paid wages at rates not less than those prevailing on similar construction in the locality as
determined by the Secretary of Labor in accordance with sections 3141–3144, 3146, and
3147 of title 40, and every such employee shall receive compensation at a rate not less than
one and ½ times the basic rate of pay of the employee for all hours worked in any workweek
in excess of eight hours in any workday or 40 hours in the workweek, as the case may be.
The Administrator shall make no contribution of Federal funds without first obtaining
adequate assurance that these labor standards will be maintained upon the construction work.
The Secretary of Labor shall have, with respect to the labor standards specified in this
subsection, the authority and functions set forth in Reorganization Plan Numbered 14 of 1950
(5 U.S.C. App.) and section 3145 of title 40.
b. Requirements Related to Contract and Subcontract Services
Per 33 U.S.C. § 467f-2(i), a contract awarded shall not be considered to confer a proprietary
interest upon the United States. As a condition on the receipt of a grant under this section of
an amount greater than $1,000,000, recipients and subrecipients shall require that each
contract and subcontract for program management, construction management, planning
studies, feasibility studies, architectural services, preliminary engineering, design,
engineering, surveying, mapping, and related services entered into using funds from the grant
be awarded in the same manner as a contract for architectural and engineering services is
awarded under 40 U.S. Code Chapter 11 or an equivalent qualifications-based requirement
prescribed by the recipient state.
c. Prohibitions on Expending FEMA Award Funds for Covered Telecommunications
Equipment or Services
Recipients and subrecipients of FEMA federal financial assistance are subject to the
prohibitions described in section 889 of the John S. McCain National Defense Authorization
Act for Fiscal Year 2019 (FY 2019 NDAA), Pub. L. No. 115-232 (2018) and 2 C.F.R. §§
200.216, 200.327, 200.471, and Appendix II to 2 C.F.R. Part 200. Beginning August 13,
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
27
2020, the statute – as it applies to FEMA recipients, subrecipients, and their contractors and
subcontractors – prohibits obligating or expending federal award funds on certain
telecommunications and video surveillance products and contracting with certain entities for
national security reasons.
Guidance is available at FEMA Policy #405-143-1 - Prohibitions on Expending FEMA
Award Funds for Covered Telecommunications Equipment or Services
Additional guidance is available at Contract Provisions Guide: Navigating Appendix II to
Part 200 - Contract Provisions for Non-Federal Entity Contracts Under Federal Awards
(fema.gov).
Effective August 13, 2020, FEMA recipients and subrecipients may not use any FEMA
funds under open or new awards to:
• Procure or obtain any equipment, system, or service that uses covered
telecommunications equipment or services as a substantial or essential component of
any system, or as critical technology of any system;
• Enter into, extend, or renew a contract to procure or obtain any equipment, system, or
service that uses covered telecommunications equipment or services as a substantial
or essential component of any system, or as critical technology of any system; or
• Enter into, extend, or renew contracts with entities that use covered
telecommunications equipment or services as a substantial or essential component of
any system, or as critical technology as part of any system.
I. D
EFINITIONS
Per section 889(f)(2)-(3) of the FY 2019 NDAA and 2 C.F.R. § 200.216, covered
telecommunications equipment or services means:
i. Telecommunications equipment produced by Huawei Technologies Company
or ZTE Corporation, (or any subsidiary or affiliate of such entities);
ii. For the purpose of public safety, security of Government facilities, physical
security surveillance of critical infrastructure, and other national security
purposes, video surveillance and telecommunications equipment produced by
Hytera Communications Corporation, Hangzhou Hikvision Digital
Technology Company, or Dahua Technology Company (or any subsidiary or
affiliate of such entities);
iii. Telecommunications or video surveillance services provided by such entities
or using such equipment; or
iv. Telecommunications or video surveillance equipment or services produced or
provided by an entity that the Secretary of Defense, in consultation with the
Director of National Intelligence or the Director of the Federal Bureau of
Investigation, reasonably believes to be an entity owned or controlled by, or
otherwise connected to, the People’s Republic of China.
Examples of the types of products covered by this prohibition include phones,
internet, video surveillance, and cloud servers when produced, provided, or used by
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
28
the entities listed in the definition of “covered telecommunications equipment or
services.” See 2 C.F.R. § 200.471.
d. Enhancing Critical Infrastructure Cybersecurity.
When eligible subapplications include an information technology or operational technology
component as part of a project under this program, FEMA will allow activities that enable
greater resilience through cybersecurity as eligible costs when those activities are performed
in accordance with the cybersecurity performance goals for critical infrastructure and control
systems directed by the National Security Presidential Memorandum on Improving
Cybersecurity for Critical Infrastructure Control Systems, found at
https://www.cisa.gov/control-systems-goals-and-objectives. Subapplicants should address
cybersecurity in their planning, design, and project oversight for awards that include a
technology nexus that may pose a cyber risk that would affect the reliability or operability of
project.
e. Pre-Award Costs
Pre-award costs are not allowed.
f. Management and Administration (M&A) Costs
Management and administration (M&A) activities are those directly relating to the
management and administration of HHPD funds, such as financial management and
monitoring. M&A costs are not operational costs. They are the necessary costs incurred in
direct support of the grant or as a consequence of the grant and should be allocated across the
entire lifecycle of the grant. A maximum of up to 10 percent of HHPD funds awarded may be
retained by the state, and any funds retained are to be used solely for M&A purposes
associated with the HHPD award. Subrecipients may also retain a maximum of up to 5
percent of the funding passed through by the state solely for M&A purposes associated with
the HHPD award. Applicant requests for management costs must be included in the State
Administrative Plan. Subrecipient management cost activities must be added to the scope of
work section and reflected in the cost estimate section of subgrant applications.
Applicants and subrecipients who do not receive awards/subawards will not receive
reimbursement for management costs.
g. Indirect Facilities & Administrative (F&A) Costs
Indirect costs are allowable under this program as described in 2 Code of Federal Regulations
Part 200, including 2 Code of Federal Regulations § 200.414. Applicants with a current
negotiated indirect cost rate agreement that desire to charge indirect costs to an award must
provide a copy of their negotiated indirect cost rate agreement at the time of application. Not
all applicants are required to have a current negotiated indirect cost rate agreement.
Applicants that are not required by 2 Code of Federal Regulations Part 200 to have a
negotiated indirect cost rate agreement but are required by 2 Code of Federal Regulations.
Part 200 to develop an indirect cost rate proposal must provide a copy of their proposal at the
time of application. Applicants who do not have a current negotiated indirect cost rate
agreement (including a provisional rate) and wish to charge the de minimis rate must reach
out to the regional Grants Program Manager for further instructions. Applicants who wish to
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
29
use a cost allocation plan in lieu of an indirect cost rate must also reach out to the regional
grants program manager for further instructions.
E. Application Review Information
1. Application Evaluation Criteria
In addition to the eligibility requirements stated in Section C., Eligibility Information,
the following programmatic criteria must be met and will be evaluated during the
application review.
a. Programmatic Criteria for Mitigation Plan Requirement
Applicant
During the application review period for completeness and eligibility, FEMA will validate if the
Applicant has an approved state mitigation plan that includes all dam risks. See Section H.19.,
Definitions, for the definition of All Dam Risk. If the Applicant has an approved state mitigation
plan that does not include all dam risks, the program will inform the Applicant of the
determination and the Applicant may submit a request for an extension to the mitigation plan
requirement. Applicants may coordinate with FEMA for a review of the approved state
mitigation plan to assess for all dam risks in advance of the application deadline. All
supplemental attachments must be submitted via FEMA GO. See Section H.13., Mitigation
Plan Requirement Extension Requests.
Applicant’s state hazard mitigation plan will be assessed against 44 Code of Federal Regulations
Part 201, Mitigation Planning, and the requirements specific to assessing all dam risks set forth
in the State Mitigation Planning Policy Guide (FEMA, April 2022). The requirements in this
NOFO supersede requirements in the Rehabilitation of High Hazard Potential Dams Grant
Program Guidance (FEMA, June 2020) and the FEMA Policy 104- 008-7, to determine if the
plan complies with the requirement to address all dam risks.
For additional information on all other state mitigation plan requirements and FEMA procedures
for review and approval of state mitigation plans, see the State Mitigation Planning Policy Guide
(FEMA, April 2022).
Subrecipients
Subrecipients must demonstrate that the tribal or local government with jurisdiction over the area
in which the dam is located has in place at the time the SAA submits the SOW package to
FEMA, ands the time FEMA approves the SOW package, an approved hazard mitigation plan
that includes all dam risks. See Section H.19., Definitions, for the definition of All Dam Risk.
The hazard mitigation plan must comply with the Disaster Mitigation Act of 2000 (Public. L.
106–390; 114 Stat. 1552). Dams owned by nonprofit organizations that are subrecipients must be
located in a local jurisdiction with an approved hazard mitigation plan that includes all dam risks
and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114 Stat. 1552).
FEMA will determine if the mitigation plan addresses all dam risks in accordance with the
requirements specific to assessing all dam risks set forth in the Local Mitigation Planning Policy
Guide (FEMA, April 2022). These requirements supersede the Rehabilitation of High Hazard
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
30
Potential Dams Grant Program Guidance (FEMA, June 2020) and the FEMA Policy 104- 008-7,
to determine if the plan complies with the requirement to address all dam risks.
For additional information on all other local mitigation plan requirements and FEMA procedures
for review and approval of local mitigation plans, see FEMA’s Local Mitigation Plan Review
Guide (Local Guide) (2022) /
Guía de Revisión del Plan Local de Mitigación (2022) or subsequent update.
If the dam is located on land under jurisdiction of a Federally recognized tribal government, the
tribal mitigation plan must address all dam risks. FEMA will validate whether each of the
following elements are included in the tribal plan:
a. Does the plan describe the incorporation of existing plans, studies, reports, and technical
information for high hazard potential dams?
b. Does the plan address high hazard potential dams in the risk assessment?
c. Does the plan include mitigation goals to reduce long-term vulnerabilities from high hazard
potential dams?
d. Does the plan include actions that address high hazard potential dams, and prioritize
mitigation actions to reduce vulnerabilities from high hazard potential dams?
For additional information on tribal mitigation plan requirements, reference the Tribal Mitigation
Plan Review Guide (December 2017).
If an HHPD subrecipient cannot demonstrate that the local or tribal government with jurisdiction
over the area in which the dam is located has in place a hazard mitigation plan that includes all
dam risks; and complies with the Disaster Mitigation Act of 2000 (Public Law 106–390; 114
Stat. 1552); then the subrecipient may request an extension to meet this requirement, and may
need to coordinate with the jurisdiction where the dam is located to update the mitigation plan to
include all dam risks within twelve (12) months. For more information see Section H.13.,
Mitigation Plan Requirement Extension Requests.
b. Financial Integrity Criteria
Prior to making a federal award, FEMA is required by 31 U.S.C. § 3354, as enacted by the
Payment Integrity Information Act of 2019, Pub. L. No. 116-117 (2020); 41 U.S.C. § 2313;
and 2 C.F.R. § 200.206 to review information available through any Office of Management
and Budget (OMB)-designated repositories of governmentwide eligibility qualification or
financial integrity information, including whether the applicant is suspended or debarred.
FEMA may also pose additional questions to the applicant to aid in conducting the pre-award
risk review. Therefore, application evaluation criteria may include the following risk-based
considerations of the applicant:
i. Financial stability.
ii. Quality of management systems and ability to meet management standards.
iii. History of performance in managing federal award.
iv. Reports and findings from audits.
v. Ability to effectively implement statutory, regulatory, or other requirements.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
31
c. Supplemental Financial Integrity Criteria and Review
Prior to making a federal award where the anticipated total federal share will be greater than
the simplified acquisition threshold, currently $250,000:
i. FEMA is required to review and consider any information about the applicant,
including information on the applicant’s immediate and highest-level owner,
subsidiaries, and predecessors, if applicable, that is in the designated integrity
and performance system accessible through the System for Award
Management (SAM), which is currently the Federal Awardee Performance
and Integrity Information System (FAPIIS).
ii. An applicant, at its option, may review information in FAPIIS and comment
on any information about itself that a federal awarding agency previously
entered.
iii. FEMA will consider any comments by the applicant, in addition to the other
information in FAPIIS, in making a judgment about the applicant’s integrity,
business ethics, and record of performance under federal awards when
completing the review of risk posed by applicants as described in 2 C.F.R. §
200.206.
2. Review and Selection Process
The review and selection process will be completed in two parts:
Part 1
FEMA reviews applications for completeness and eligibility as well as the brief scoping
narratives for potential FY24 projects. After the Part 1 review is complete, FEMA will notify
states of funding amounts via the FEMA GO system.
During Part 1, SAAs will submit applications into Grants.gov and FEMA Go, and FEMA
Headquarters will review the applications for completeness and eligibility. SAAs are to
include clearly defined State objectives, a proposal narrative, and the required critical data to
support proposal. Applicants will be evaluated and selected for funding based on the
following:
1. The Applicant has the authority and demonstrates the capability necessary to successfully
fulfill the requirements of the HHPD.
2. The dams included on the Applicant’s list of eligible high hazard potential dams meet
eligibility criteria.
3. The Applicant demonstrates how HHPD funds will advance the HHPD priorities and
performance goals and provides brief scoping narratives for potential FY24 projects.
4. The State Administrative Plan must clearly describe the SAA’s timelines and milestones
for implementing the HHPD grant. The State Administrative Plan must describe the process
for selecting subrecipients. The State Administrative Plan must also describe methodology
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
32
and data used to measure progress toward achieving the performance outcomes of the HHPD
grant.
5. FEMA will validate if the Applicant has an approved state mitigation plan that includes all
dam risks.
FEMA may request additional information from the Applicant for clarification and better
understanding of the proposed grant activities during this review period.
Part 2
SAA accepts the funding award and develops and submits a Scope of Work (SOW) package
to include a narrative of how and why the projects were selected for funding, detailed
quarterly milestone workplan, EHP checklist, and budget narrative (Refer to FEMA Program
Officer for checklist for SOW package). The SOW package must be submitted to FEMA for
review during the Part 2 submission period. FEMA will review the subrecipient’s local
hazard mitigation plan for eligibility. See Section D.10.b, Program-Specific Required
Forms and Information and Section F.2., Pass-Through Requirements, for requirements.
See Section E.1.a, Programmatic Criteria for Mitigation Plan Requirement, for more
details on specific application evaluation criteria.
F. Federal Award Administration Information
1. Notice of Award
Before accepting the award, the AOR and recipient should carefully read the award package.
The award package includes instructions on administering the grant award and the terms and
conditions associated with responsibilities under federal awards. Recipients must accept all
conditions in this NOFO as well as any specific terms and conditions in the Notice of
Award to receive an award under this program.
FEMA will provide the federal award package to the applicant electronically via FEMA GO.
Award packages include an Award Letter, Summary Award Memo, Agreement Articles, and
Obligating Document. An email notification of the award package will be sent through
FEMA’s grant application system to the Authorized Organization Representative (AOR) that
submitted the application.
Recipients must accept their awards no later than 60 days from the award date. The recipient
shall notify FEMA of its intent to accept and proceed with work under the award through the
FEMA GO system.
Funds will remain on hold until the recipient accepts the award through the FEMA GO
system and all other conditions of the award have been satisfied or until the award is
otherwise rescinded. Failure to accept a grant award within the specified timeframe may
result in a loss of funds.
2. Pass-Through Requirements
All pass-through entities must comply with 2 Code of Federal Regulations 200.332
Requirements for pass-through entities. Awards made to the SAA for HHPD carry additional
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
33
pass-through requirements. Pass-through is defined as an obligation on the part of the SAA to
make funds available to eligible subrecipients. Four requirements must be met to pass-
through grant funds:
i. The SAA must submit a SOW package to FEMA for approval that describes the budget
and project scope for each subrecipient in accordance with 2 Code of Federal Regulations
§ 200.308.
ii. The SAA must make a firm written commitment to passing through grant funds to
subrecipients;
iii. The SAA’s commitment must be unconditional (i.e., no contingencies for the availability
of SAA funds);
iv. There must be documentary evidence (i.e., award document, terms, and conditions) of the
commitment; and
v. The award terms must be communicated to the subrecipient, including the requirement
for an approved local or tribal mitigation plan (that meet the requirements set forth at 44
Code of Federal Regulations. Part 201 Mitigation Planning) that addresses all dam risks
for the jurisdiction where the dam is located.
Timing and Amount
The SAA must pass-through the HHPD subaward to eligible subrecipients within 90 calendar
days of receipt of the funds. “Receipt of the funds” occurs when the FEMA GO system
releases the financial hold of the award, following FEMA approval of the SOW package.
SAAs are sent notification of the release of financial hold of the HHPD award funds via the
FEMA GO system.
3. Administrative and National Policy Requirements
In addition to the requirements of in this section and in this NOFO, FEMA may place
specific terms and conditions on individual awards in accordance with 2 C.F.R. Part 200.
a. DHS Standard Terms and Conditions
All successful applicants for DHS grant and cooperative agreements are required to comply
with DHS Standard Terms and Conditions, which are available online at: DHS Standard
Terms and Conditions.
The applicable DHS Standard Terms and Conditions will be those in effect at the time the
award was made. What terms and conditions will apply for the award will be clearly stated in
the award package at the time of award.
b. Ensuring the Protection of Civil Rights
As the Nation works towards achieving the National Preparedness Goal, it is important to
continue to protect the civil rights of individuals. Recipients and subrecipients must carry out
their programs and activities, including those related to the building, sustainment, and
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
34
delivery of core capabilities, in a manner that respects and ensures the protection of civil
rights for protected populations.
Federal civil rights statutes, such as Section 504 of the Rehabilitation Act of 1973 and Title
VI of the Civil Rights Act of 1964, along with DHS and FEMA regulations, prohibit
discrimination on the basis of race, color, national origin, sex, religion, age, disability,
limited English proficiency, or economic status in connection with programs and activities
receiving federal financial assistance from FEMA.
The DHS Standard Terms and Conditions include a fuller list of the civil rights provisions
that apply to recipients. These terms and conditions can be found in the DHS Standard Terms
and Conditions. Additional information on civil rights provisions is available at
https://www.fema.gov/about/offices/equal-rights/civil-rights.
Monitoring and oversight requirements in connection with recipient compliance with federal
civil rights laws are also authorized pursuant to 44 C.F.R. Part 7.
In accordance with civil rights laws and regulations, recipients and subrecipients must ensure
the consistent and systematic fair, just, and impartial treatment of all individuals, including
individuals who belong to underserved communities that have been denied such treatment.
c. Environmental Planning and Historic Preservation (EHP) Compliance
As a federal agency, FEMA is required to consider the effects of its actions on the
environment and historic properties to ensure that all activities and programs funded by
FEMA, including grant-funded projects, comply with federal EHP laws, Executive Orders,
regulations, and policies, as applicable.
All FEMA actions, including grant-funded actions, must comply with National Flood
Insurance Program criteria or any more restrictive federal, state, or local floodplain
management standards or building code (44 CFR § 9.11(d)(6)).
All FEMA-funded non-critical actions in 1% annual chance floodplains (also known as 100-
year floodplains) that involve structure elevation, mitigation reconstruction, dry
floodproofing, new construction, repair of substantial damage or substantial improvement of
structures must be elevated, at a minimum, to the lower of:
• Two feet above the 1% annual chance flood elevation (also known as the base
flood elevation), in accordance with the Federal Flood Risk Management Standard
(FFRMS) “Freeboard Value Approach” (FVA); or
• The 0.2% annual chance flood elevation. Where 0.2% annual chance flood
elevations are not available, such actions must be elevated to at least two feet above the
1% annual chance flood elevation.
All FEMA-funded critical actions in 1% annual chance floodplains or 0.2% annual chance
floodplains (also known as 500-year floodplains) that involve structure elevation, mitigation
reconstruction, dry floodproofing, new construction, repair of substantial damage or
substantial improvement of structures must be elevated, at a minimum, to the higher of:
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
35
• Three feet above the 1% annual chance flood elevation; or
• The 0.2% annual chance flood elevation. Where 0.2% annual chance flood
elevations are not available, such actions must be elevated to at least three feet above the
1% annual chance flood elevation.
See Executive Order 11988, Floodplain Management, as amended by Executive Order
13690, Establishing a Federal Flood Risk Management Standard and a Process for Further
Soliciting and Considering Stakeholder Input.
Recipients and subrecipients proposing projects that have the potential to impact the
environment, including, but not limited to, the construction of communication towers,
modification or renovation of existing buildings, structures, and facilities, or new
construction including replacement of facilities, must participate in the FEMA EHP
review process. The EHP review process involves the submission of a detailed project
description along with any supporting documentation requested by FEMA in order to
determine whether the proposed project has the potential to impact environmental resources
or historic properties.
In some cases, FEMA is also required to consult with other regulatory agencies and the
public in order to complete the review process. Federal law requires EHP review to be
completed before federal funds are released to carry out proposed projects. FEMA may not
be able to fund projects that are not incompliance with applicable EHP laws, Executive
Orders, regulations, and policies.
DHS and FEMA EHP policy is found in directives and instructions available on the
FEMA.gov EHP page, the FEMA website page that includes documents regarding EHP
responsibilities and program requirements, including implementation of the National
Environmental Policy Act and other EHP regulations and Executive Orders. Individual
FEMA programs have separate procedures to conduct and document EHP review. Guidance
for individual grant programs is available from applicable program offices.
d. Good Jobs
The Good Jobs Initiative is a Department of Labor-led initiative that provides critical
information to workers, employers, and government agencies as they work to improve job
quality and create access to good jobs free from discrimination and harassment for all
working people. During the implementation of a hazard mitigation project, applicants are
encouraged to leverage the Good Jobs Initiative for information and resources on these
topics. To learn more about the Good Jobs Initiative visit https://www.dol.gov/general/good-
jobs.
4. Reporting
Recipients are required to submit various financial and programmatic reports as a condition
of award acceptance. Future awards and funds drawdown may be withheld if these reports
are delinquent.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
36
a. Financial Reporting Requirements
I. F EDERAL FINANCIAL REPORT (FFR)
Recipients must report obligations and expenditures through the FFR form (SF-425) to
FEMA.
Recipients may review the Federal Financial Reporting Form (FFR) (SF-425) at
https://www.grants.gov/web/grants/forms/post-award-reporting-forms.html#sortby=1
Recipients must file the FFR electronically using FEMA GO.
II. FFR REPORTING PERIODS AND DUE DATES
An FFR must be submitted quarterly throughout the POP, including partial calendar quarters,
as well as in periods where no grant award activity occurs. The final FFR is due within 120
calendar days after the end of the POP. Future awards and fund drawdowns may be withheld
if these reports are delinquent, demonstrate lack of progress, or are insufficient in detail.
Except for the final FFR due at 120 days after the end of the POP for purposes of closeout,
the following reporting periods and due dates apply for the FFR:
Reporting Period Report Due Date
October 1 – December 31 January 30
January 1 – March 31 April 30
April 1 – June 30 July 30
July 1 – September 30 October 30
b. Programmatic Performance Reporting Requirements
I. PERFORMANCE PROGRESS REPORT (PPR)
Grant recipients are responsible for providing performance reports on a quarterly basis.
Performance progress reports should be submitted as either a word document or a pdf file.
Performance progress reports are due within 30 days after the end of each reporting period,
must be submitted via FEMA GO, and must include at a minimum the following:
The recipient must use FEMA’s template to submit a quarterly performance progress report
(PPR) for each award. See Appendix B, Performance Progress Report (PRR).
Performance reports include:
1. Reporting period, date of report, and recipient point of contact (POC) name and contact
information.
2. SF-PPR must be used and submitted via FEMA GO
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
37
3. Project identification information, including FEMA project number, subrecipient, and
project type using standard FEMA GO.
4. Significant activities and developments that have occurred or have shown progress during
the quarter, including a comparison of actual accomplishments to the work schedule
objectives established in the subaward.
5. Percent completion and whether completion of work is on schedule; a discussion of any
problems, delays, or adverse conditions that will impair the ability to meet the timelines
stated in the subaward; and anticipated completion date.
6. Status of costs, including whether the costs are (1) unchanged, (2) overrun, or (3)
underrun. If there is a change in cost status, the report should include a narrative describing
the change. Also, include amount dispersed to subrecipient by activity.
7. A statement of whether a request to extend the award POP is anticipated.
8. Incremental funding amounts (SFM) and progress completed.
9. Additional information as required by FEMA to assess the progress of an award.
The following reporting periods and due dates apply:
Reporting Period Report Due Date
August 1 – September 30 October 30 (First Report)
October 1 – December 31 January 30
January 1 – March 31 April 30
April 1 – June 30 July 30
July 1 – September 30 October 30
c. Closeout Reporting Requirements
I. CLOSEOUT REPORTING
Within 120 calendar days after the end of the period of performance for the prime award or
after an amendment has been issued to close out an award before the original POP ends,
recipients must liquidate all financial obligations and must submit the following:
i. The final request for payment, if applicable.
ii. The final FFR (SF-425).
iii. The final progress report detailing all accomplishments, including a narrative summary
of the impact of those accomplishments throughout the period of performance.
iv. Documentation regarding appeals or dispute settlement
v. Other documents required by this funding opportunity, terms and conditions of the
award, or other FEMA guidance. These include, but are not limited to:
• Records for real property and equipment acquired with federal funds must be retained
for three years after final disposition of the property. See 2 Code of Federal
Regulations § 200.334(c).
• If any litigation, claim, or audit is started before the expiration of the three-year
period, the records must be retained until all litigation, claims, or audit findings
involving the records have been resolved and final action taken. See 2 Code of
Federal Regulations § 200.334(a).
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
38
• The record retention period will be extended if the recipient is notified in writing of
the extension by FEMA, the cognizant or oversight agency for audit, or the cognizant
agency for indirect costs. See 2 Code of Federal Regulations § 200.334(b).
• Where FEMA requires recipients to report program income after the period of
performance ends, the program income record retention period begins at the end of
the recipient’s fiscal year in which program income is earned. See 2 Code of Federal
Regulations § 200.334(e).
• For indirect cost rate proposals, cost allocation plans, or other rate computations
records, the start of the record retention period depends on whether the indirect cost
rate documents were submitted for negotiation. If the indirect cost rate documents
were submitted for negotiation, the record retention period begins from the date those
documents were submitted for negotiation. If indirect cost rate documents were not
submitted for negotiation, the record retention period begins at the end of the
recipient’s fiscal year or other accounting period covered by that indirect cost rate.
See 2 Code of Federal Regulations § 200.334(f).
In addition, pass-through entities are responsible for closing out their subawards as described
in 2 C.F.R. § 200.344; subrecipients are still required to submit closeout materials within 90
calendar days of the period of performance end date. When a subrecipient completes all
closeout requirements, pass-through entities must promptly complete all closeout actions for
subawards in time for the recipient to submit all necessary documentation and information to
FEMA during the closeout of the prime award.
After the prime award closeout reports have been reviewed and approved by FEMA, a
closeout notice will be completed to close out the grant. The notice will indicate the period of
performance as closed, list any remaining funds that will be de-obligated, and address the
requirement of maintaining the grant records for at least three years from the date of the final
FFR. The record retention period may be longer, such as due to an audit or litigation, for
equipment or real property used beyond the period of performance, or due to other
circumstances outlined in 2 C.F.R. § 200.334.
The recipient is responsible for refunding to FEMA any balances of unobligated cash that
FEMA paid that are not authorized to be retained per 2 C.F.R. § 200.344(d).
II. A DMINISTRATIVE CLOSEOUT
Administrative closeout is a mechanism for FEMA to unilaterally move forward with
closeout of an award using available award information in lieu of final reports from the
recipient per 2 C.F.R. § 200.344(h)-(i). It is a last resort available to FEMA, and if FEMA
needs to administratively close an award, this may negatively impact a recipient’s ability to
obtain future funding. This mechanism can also require FEMA to make cash or cost
adjustments and ineligible cost determinations based on the information it has, which may
result in identifying a debt owed to FEMA by the recipient.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
39
When a recipient is not responsive to FEMA’s reasonable efforts to collect required reports
needed to complete the standard closeout process, FEMA is required under 2 C.F.R. §
200.344(h) to start the administrative closeout process within the regulatory timeframe.
FEMA will make at least three written attempts to collect required reports before initiating
administrative closeout. If the recipient does not submit all required reports in accordance
with 2 C.F.R. § 200.344, this NOFO, and the terms and conditions of the award, FEMA must
proceed to administratively close the award with the information available within one year of
the period of performance end date. Additionally, if the recipient does not submit all required
reports within one year of the period of performance end date, per 2 C.F.R. § 200.344(i),
FEMA must report in FAPIIS the recipient’s material failure to comply with the terms and
conditions of the award.
If FEMA administratively closes an award where no final FFR has been submitted, FEMA
uses that administrative closeout date in lieu of the final FFR submission date as the start of
the record retention period under 2 C.F.R. § 200.334.
In addition, if an award is administratively closed, FEMA may decide to impose remedies for
noncompliance per 2 C.F.R. § 200.339, consider this information in reviewing future award
applications, or apply special conditions to existing or future awards.
d. Additional Reporting Requirements
I. D ISCLOSING INFORMATION PER 2 C.F.R. § 180.335
This reporting requirement pertains to disclosing information related to government-wide
suspension and debarment requirements. Before a recipient enters into a grant award with
FEMA, the recipient must notify FEMA if it knows if it or any of the recipient’s principals
under the award fall under one or more of the four criteria listed at 2 C.F.R. § 180.335:
i. Are presently excluded or disqualified;
ii. Have been convicted within the preceding three years of any of the offenses listed in
2 C.F.R. § 180.800(a) or had a civil judgment rendered against it or any of the
recipient’s principals for one of those offenses within that time period;
iii. Are presently indicted for or otherwise criminally or civilly charged by a
governmental entity (federal, state, or local) with commission of any of the offenses
listed in 2 C.F.R. § 180.800(a); or
iv. Have had one or more public transactions (federal, state, or local) terminated within
the preceding three years for cause or default.
At any time after accepting the award, if the recipient learns that it or any of its principals
falls under one or more of the criteria listed at 2 C.F.R. § 180.335, the recipient must
provide immediate written notice to FEMA in accordance with 2 C.F.R. § 180.350.
II. R EPORTING OF MATTERS RELATED TO RECIPIENT INTEGRITY AND PERFORMANCE
Per 2 C.F.R. Part 200, Appendix I § F.3, the additional post-award reporting requirements in
2 C.F.R. Part 200, Appendix XII may apply to applicants who, if upon becoming recipients,
have a total value of currently active grants, cooperative agreements, and procurement
contracts from all federal awarding agencies that exceeds $10,000,000 for any period of time
during the period of performance of an award under this funding opportunity.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
40
Recipients that meet these criteria must maintain current information reported in FAPIIS
about civil, criminal, or administrative proceedings described in paragraph 2 of Appendix XII
at the reporting frequency described in paragraph 4 of Appendix XII.
III. SINGLE AUDIT REPORT
For audits of fiscal years beginning on or after December 26, 2014, recipients that expend
$750,000 or more from all federal funding sources during their fiscal year are required to
submit an organization-wide financial and compliance audit report, also known as the single
audit report.
The audit must be performed in accordance with the requirements of U.S. Government
Accountability Office’s (GAO) Government Auditing Standards, located at
https://www.gao.gov/yellowbook/overview, and the requirements of Subpart F of 2 C.F.R.
Part 200, located at http://www.ecfr.gov/cgi-bin/text-idx?node=sp2.1.200.f.
5. Monitoring and Oversight
Per 2 C.F.R. § 200.337, FEMA, through its authorized representatives, has the right, at all
reasonable times, to make site visits or conduct desk reviews to review project
accomplishments and management control systems to review award progress and to provide
any required technical assistance. During site visits or desk reviews, FEMA will review
recipients’ files related to the award. As part of any monitoring and program evaluation
activities, recipients must permit FEMA, upon reasonable notice, to review grant-related
records and to interview the organization’s staff and contractors regarding the program.
Recipients must respond in a timely and accurate manner to FEMA requests for information
relating to the award.
Effective monitoring and oversight help FEMA ensure that recipients use grant funds for
their intended purpose(s); verify that projects undertaken are consistent with approved plans;
and ensure that recipients make adequate progress toward stated goals and objectives.
Additionally, monitoring serves as the primary mechanism to ensure that recipients comply
with applicable laws, rules, regulations, program guidance, and requirements. FEMA
regularly monitors all grant programs both financially and programmatically in accordance
with federal laws, regulations (including 2 C.F.R. Part 200), program guidance, and the terms
and conditions of the award. All monitoring efforts ultimately serve to evaluate progress
towards grant goals and proactively target and address issues that may threaten grant success
during the period of performance.
FEMA staff will periodically monitor recipients to ensure that administrative processes,
policies and procedures, budgets, and other related award criteria are meeting Federal
Government-wide and FEMA regulations. Aside from reviewing quarterly financial and
programmatic reports, FEMA may also conduct enhanced monitoring through either desk-
based review, onsite monitoring visits, or both. Enhanced monitoring will involve the review
and analysis of the financial compliance and administrative processes, policies, activities, and
other attributes of each federal assistance award, and it will identify areas where the recipient
may need technical assistance, corrective actions, or other support.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
41
Financial and programmatic monitoring are complementary processes within FEMA’s
overarching monitoring strategy that function together to ensure effective grants
management, accountability, and transparency; validate progress against grant and program
goals; and safeguard federal funds against fraud, waste, and abuse. Financial monitoring
primarily focuses on statutory and regulatory compliance with administrative grant
requirements, while programmatic monitoring seeks to validate and assist in grant progress,
targeting issues that may be hindering achievement of project goals and ensuring compliance
with the purpose of the grant and grant program. Both monitoring processes are similar in
that they feature initial reviews of all open awards, and additional, in-depth monitoring of
grants requiring additional attention.
Recipients and subrecipients who are pass-through entities are responsible for monitoring
their subrecipients in a manner consistent with the terms of the federal award at 2 C.F.R. Part
200, including 2 C.F.R. § 200.332. This includes the pass-through entity’s responsibility to
monitor the activities of the subrecipient as necessary to ensure that the subaward is used for
authorized purposes, in compliance with federal statutes, regulations, and the terms and
conditions of the subaward; and that subaward performance goals are achieved.
In terms of overall award management, recipient and subrecipient responsibilities include,
but are not limited to: accounting of receipts and expenditures, cash management,
maintaining adequate financial records, reporting and refunding expenditures disallowed by
audits, monitoring if acting as a pass-through entity, or other assessments and reviews, and
ensuring overall compliance with the terms and conditions of the award or subaward, as
applicable, including the terms of 2 C.F.R. Part 200.
G. DHS Awarding Agency Contact Information
1. Contact and Resource Information
a. Program Office Contact
Jena’I Jordan
National Dam Safety Program
Federal Emergency Management Agency Phone: (202) 646-3286
jenai.jordan@fema.dhs.gov
FEMA Grants News
FEMA Grants News is a non-emergency comprehensive management and information resource
developed by FEMA for grants stakeholders. This channel provides general information on all
FEMA grant programs and maintains a comprehensive database containing key personnel
contact information at the federal, state, and local levels. When necessary, recipients will be
directed to a federal point of contact who can answer specific programmatic questions or
concerns. FEMA Grants Information Desk can be reached by e-mail at fema-grants-
news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9:00 AM – 5:00
PM ET.
c. Grant Programs Directorate (GPD) Award Administration Division
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
42
GPD’s Award Administration Division (AAD) provides support regarding financial matters
and budgetary technical assistance. Additional guidance and information can be obtained by
contacting the AAD’s Help Desk via e-mail at ASK-GMD@fema.dhs.gov.
d. FEMA Regional Offices
FEMA Regional Offices also may provide fiscal support, including pre- and post-award
administration and technical assistance such as conducting cash analysis, financial
monitoring, and audit resolution to the grant program under this NOFO. National Dam Safety
Program Regional Program Manager will provide programmatic support and technical
assistance. will provide programmatic support and technical assistance.
FEMA Regional Offices manage, administer, and conduct the application budget review,
create the award package, approve, amend, and close out awards, as well as conduct cash
analysis, financial and programmatic monitoring, and audit resolution for National Dam
Safety Program Regional Program Manager will provide programmatic support and technical
assistance. The Regions also provide technical assistance to The Regions also provide
technical assistance to HHPD recipients.
FEMA Regional Office contact information is available at https://www.fema.gov/fema-
regional-contacts.
Region Dam
Safety
Program
Officer
Phone/email Regional
Grants
Management
Staff
Phone/email
1 Christian
Oates
christian.oates@fema.dhs.gov
(540) 326-1601
Tracy
Narbeth
tracy.narbeth@fema.dhs.gov
(617) 306-9492
2 Regina
Majercak
regina.majercak@fema.dhs.gov
(917) 561-3256
George W.
Hogan III
George.Hoganiii@fema.dhs.gov
(212) 680-8599
3 Kristen
Jones
kristen.jones@fema.dhs.gov
(267) 896-1116
Mark Lockett mark.lockett@fema.dhs.gov
(215) 435-5256
4 Katy
Goolsby-
Brown &
Nathaniel
Sims, Sr.
katy.goolsby-
brown@fema.dhs.gov
(770) 220-8811
nathaniel.simssr@fema.dhs.gov
(770) 220-5200
Ceporia
McMillian
ceporia.mcmillian@fema.dhs.gov
(202) 717-7096
5 FEMA
HHPD
fema-ndsp@fema.dhs.gov Jason
Kirkman
Jason.kirkman@fema.dhs.gov
(312) 852-5580
6 John
Miles, Jr.
john.milesjr@fema.dhs.gov
(816) 533-2873
David
McCoy
David.McCoy3@fema.dhs.gov
(940) 383-7324
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
43
7 Dawn
Livingston
dawn.livingston@fema.dhs.gov
Office: (816) 283-7055
Mobile: (816) 810-1609
Shelly Kirk Shelly.Kirk@fema.dhs.gov
(816) 809-3279
8 Richard
Hansen
richard.hansen@fema.dhs.gov
(303) 235-4807
Dan Carlson Dan.Carlson@fema.dhs.gov
(303) 235-4825
9 Scott
Nielsen
scott.nielsen@fema.dhs.gov
(510) 219-4510
Edita
Billingsley
Edita.billingsley@fema.dhs.gov
(510) 627-7209
10 Nathan
Stueve
nathan.stueve@fema.dhs.gov
(425) 301-6247
Kim Penfold kim.penfold@fema.dhs.gov
(425) 487-4760
e. Equal Rights
The FEMA Office of Equal Rights (OER) is responsible for compliance with and
enforcement of federal civil rights obligations in connection with programs and services
conducted by FEMA and recipients of FEMA financial assistance. All inquiries and
communications about federal civil rights compliance for FEMA grants under this NOFO
should be sent to FEMA-CivilRightsOffice@fema.dhs.gov.
f. Environmental Planning and Historic Preservation
GPD’s EHP Team provides guidance and information about the EHP review process to
recipients and subrecipients. All inquiries and communications about GPD projects under
this NOFO or the EHP review process, including the submittal of EHP review materials,
should be sent to gpdehpinfo@fema.dhs.gov.
The FEMA Office of Environmental Planning and Historic Preservation (OEHP) provides
guidance and information about the EHP review process to FEMA programs and FEMA’s
recipients and subrecipients. All inquiries and communications about EHP compliance for
FEMA grant projects under this NOFO or the EHP review process should be sent to FEMA-
OEHP-NOFOQuestions@fema.dhs.gov.
2. Systems Information
a. Grants.gov
For technical assistance with Grants.gov, call the customer support hotline 24 hours per day,
7 days per week (except federal holidays) at (800) 518-4726 or e-mail at
support@grants.gov.
b. Payment and Reporting System (FEMA GO)
FEMA uses the FEMA GO system for financial reporting, invoicing, and tracking payments.
FEMA uses the Direct Deposit/Electronic Funds Transfer (DD/EFT) method of payment to
recipients.
If you have questions about the online system, please call the Customer Service Center at
(866) 927-5646 or email ask-GMD@fema.dhs.gov.
c. FEMA Grant Outcomes (GO)
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
44
For technical assistance with the FEMA GO system, please contact the FEMA GO Helpdesk
at femago@fema.dhs.gov or (877) 611-4700, Monday through Friday, 9:00 AM – 6:00 PM
ET.
H. Additional Information
I. Termination Provisions
FEMA may terminate a federal award in whole or in part for one of the following reasons.
FEMA and the recipient must still comply with closeout requirements at 2 C.F.R. §§
200.344-200.345 even if an award is terminated in whole or in part. To the extent that
subawards are permitted under this NOFO, pass-through entities should refer to 2 C.F.R. §
200.340 for additional information on termination regarding subawards.
a. Noncompliance
If a recipient fails to comply with the terms and conditions of a federal award, FEMA may
terminate the award in whole or in part. If the noncompliance can be corrected, FEMA may
first attempt to direct the recipient to correct the noncompliance. This may take the form of a
Compliance Notification. If the noncompliance cannot be corrected or the recipient is non-
responsive, FEMA may proceed with a Remedy Notification, which could impose a remedy
for noncompliance per 2 C.F.R. § 200.339, including termination. Any action to terminate
based on noncompliance will follow the requirements of 2 C.F.R. §§ 200.341-200.342 as
well as the requirement of 2 C.F.R. § 200.340(c) to report in FAPIIS the recipient’s material
failure to comply with the award terms and conditions. See also the section on Actions to
Address Noncompliance in this NOFO.
b. With the Consent of the Recipient
FEMA may also terminate an award in whole or in part with the consent of the recipient, in
which case the parties must agree upon the termination conditions, including the effective
date, and in the case of partial termination, the portion to be terminated.
c. Notification by the Recipient
The recipient may terminate the award, in whole or in part, by sending written notification to
FEMA setting forth the reasons for such termination, the effective date, and in the case of
partial termination, the portion to be terminated. In the case of partial termination, FEMA
may determine that a partially terminated award will not accomplish the purpose of the
federal award, so FEMA may terminate the award in its entirety. If that occurs, FEMA will
follow the requirements of 2 C.F.R. §§ 200.341-200.342 in deciding to fully terminate the
award.
2. Program Evaluation
Recipients and subrecipients are encouraged to incorporate program evaluation activities
from the outset of their program design and implementation to meaningfully document and
measure their progress towards meeting an agency priority goal(s). Title I of the Foundations
for Evidence-Based Policymaking Act of 2018 (Evidence Act), Pub. L. No. 115-435 (2019)
urges federal awarding agencies and federal assistance recipients and subrecipients to use
program evaluation as a critical tool to learn, to improve equitable delivery, and to elevate
program service and delivery across the program lifecycle. Evaluation means “an assessment
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
45
using systematic data collection and analysis of one or more programs, policies, and
organizations intended to assess their effectiveness and efficiency.” Evidence Act § 101
(codified at 5 U.S.C. § 311). Evaluation costs are allowable costs (either as direct or indirect),
unless prohibited by statute or regulation.
In addition, recipients are required to participate in a DHS-led evaluation if selected, which
may be carried out by a third-party on behalf of the Program Office or DHS. By accepting
grant funds, recipients agree to participate in the evaluation, which may include analysis of
individuals who benefit from the grant, and provide access to program operating personnel
and participants, as specified by the evaluator(s) during the award.
3. Period of Performance Extensions
Extensions to the period of performance (POP) for this program are allowed. Extensions to
the POP identified in the award will only be considered through formal, written requests to
the recipient’s Regional Grants Program Office and must contain specific and compelling
justifications as to why an extension is required. Recipients are advised to coordinate with
the FEMA Regional Program Analyst as needed when preparing an extension request.
All extension requests must address the following:
a. The grant program, fiscal year, and award number;
b. Reason for the delay –including details of the legal, policy, or operational challenges
that prevent the final outlay of awarded funds by the deadline;
c. Current status of the activity(ies);
d. Approved POP termination date and new project completion date;
e. Amount of funds drawn down to date;
f. Remaining available funds, both federal and, if applicable, non-federal;
g. Budget outlining how remaining federal and, if applicable, non-federal funds will be
expended;
h. Plan for completion, including milestones and timeframes for achieving each
milestone and the position or person responsible for implementing the plan for
completion; and
i. Certification that the activity(ies) will be completed within the extended POP without
any modification to the original statement of work, as described in the Rehabilitation
of High Hazard Potential Dam Guidance and as approved by FEMA. Other
documents required by this funding opportunity, terms and conditions of the award,
or other FEMA guidance.
Extension requests will be granted only due to compelling legal, policy, or operational
challenges. Extension requests will only be considered for the following reasons:
Contractual commitments by the recipient or subrecipient with vendors prevent
completion of the project, including delivery of equipment or services, within the
existing POP;
The project must undergo a complex environmental review that cannot be completed
within the existing POP;
Projects are long-term by design, and therefore acceleration would compromise core
programmatic goals; or
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
46
Where other special or extenuating circumstances exist.
Recipients should submit all proposed extension requests to FEMA for review and approval
at least 60 days prior to the end of the POP to allow sufficient processing time. Extensions
are typically granted for no more than a six-month period.
4. Disability Integration
Pursuant to Section 504 of the Rehabilitation Act of 1973, recipients of FEMA financial
assistance must ensure that their programs and activities do not discriminate against other
qualified individuals with disabilities.
Grant recipients should engage with the whole community to advance individual and
community preparedness and to work as a nation to build and sustain resilience. In doing so,
recipients are encouraged to consider the needs of individuals with disabilities into the
activities and projects funded by the grant.
FEMA expects that the integration of the needs of people with disabilities will occur at all
levels, including planning; alerting, notification, and public outreach; training; purchasing of
equipment and supplies; protective action implementation; and exercises/drills.
The following are examples that demonstrate the integration of the needs of people with
disabilities in carrying out FEMA awards:
Include representatives of organizations that work with/for people with disabilities on
planning committees, work groups and other bodies engaged in development and
implementation of the grant programs and activities.
Hold all activities related to the grant in locations that are accessible to persons with
physical disabilities to the extent practicable.
Acquire language translation services, including American Sign Language, that
provide public information across the community and in shelters.
Ensure shelter-specific grant funds are in alignment with FEMA’s Guidance on
Planning for Integration of Functional Needs Support Services in General Population
Shelters.
If making alterations to an existing building to a primary function area utilizing
federal funds, complying with the most recent codes and standards, and making path
of travel to the primary function area accessible to the greatest extent possible.
Implement specific procedures used by public transportation agencies that include
evacuation and passenger communication plans and measures for individuals with
disabilities.
Identify, create, and deliver training to address any training gaps specifically aimed
toward whole-community preparedness. Include and interact with individuals with
disabilities, aligning with the designated program capability.
Establish best practices in inclusive planning and preparedness that consider physical
access, language access, and information access. Examples of effective
communication access include providing auxiliary aids and services such as sign
language interpreters, Computer Aided Real-time Translation (CART), and materials
in Braille or alternate formats.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
47
FEMA grant recipients can fund projects towards the resiliency of the whole community,
including people with disabilities, such as training, outreach, and safety campaigns, provided
that the project aligns with this NOFO and the terms and conditions of the award.
5. Conflicts of Interest in the Administration of Federal Awards or Subawards
For conflicts of interest under grant-funded procurements and contracts, refer to the section
on Procurement Integrity in this NOFO and 2 C.F.R. §§ 200.317 – 200.327.
To eliminate and reduce the impact of conflicts of interest in the subaward process, recipients
and pass-through entities must follow their own policies and procedures regarding the
elimination or reduction of conflicts of interest when making subawards. Recipients and
pass-through entities are also required to follow any applicable federal and state, local, tribal,
or territorial (SLTT) statutes or regulations governing conflicts of interest in the making of
subawards.
The recipient or pass-through entity must disclose to the respective Program Analyst or
Program Manager, in writing, any real or potential conflict of interest that may arise during
the administration of the federal award, as defined by the federal or SLTT statutes or
regulations or their own existing policies, within five days of learning of the conflict of
interest. Similarly, subrecipients, whether acting as subrecipients or as pass-through entities,
must disclose any real or potential conflict of interest to the recipient or next-level pass-
through entity as required by the recipient or pass-through entity’s conflict of interest
policies, or any applicable federal or SLTT statutes or regulations.
Conflicts of interest may arise during the process of FEMA making a federal award in
situations where an employee, officer, or agent, any members of his or her immediate family,
his or her partner has a close personal relationship, a business relationship, or a professional
relationship, with an applicant, sub applicant, recipient, subrecipient, or FEMA employees.
6. Procurement Integrity
Through audits conducted by the DHS Office of Inspector General (OIG) and FEMA grant
monitoring, findings have shown that some FEMA recipients have not fully adhered to the
proper procurement requirements at 2 C.F.R. §§ 200.317 – 200.327 when spending grant
funds. Anything less than full compliance with federal procurement requirements jeopardizes
the integrity of the grant as well as the grant program. To assist with determining whether an
action is a procurement or instead a subaward, please consult 2 C.F.R. § 200.331. For
detailed guidance on the federal procurement standards, recipients and subrecipients should
refer to various materials issued by FEMA’s Procurement Disaster Assistance Team (PDAT),
such as the PDAT Field Manual and Contract Provisions Guide. Additional resources,
including an upcoming trainings schedule can be found on the PDAT Website:
https://www.fema.gov/grants/procurement.
The below highlights the federal procurement requirements for FEMA recipients when
procuring goods and services with federal grant funds. FEMA will include a review of
recipients’ procurement practices as part of the normal monitoring activities. All
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
48
procurement activity must be conducted in accordance with federal procurement
standards at 2 C.F.R. §§ 200.317 – 200.327. Select requirements under these standards are
listed below. The recipient and any of its subrecipients must comply with all requirements,
even if they are not listed below.
Under 2 C.F.R. § 200.317, when procuring property and services under a federal award,
states (including territories) must follow the same policies and procedures they use for
procurements from their non-federal funds; additionally, states must now follow 2 C.F.R. §
200.321 regarding socioeconomic steps, 200.322 regarding domestic preferences for
procurements, 200.323 regarding procurement of recovered materials, and 2 C.F.R. §
200.327 regarding required contract provisions.
All other non-federal entities, such as tribes (collectively, non-state entities), must have and
use their own documented procurement procedures that reflect applicable SLTT laws and
regulations, provided that the procurements conform to applicable federal law and the
standards identified in 2 C.F.R. Part 200. These standards include, but are not limited to,
providing for full and open competition consistent with the standards of 2 C.F.R. § 200.319
and the required procurement methods at § 200.320.
a. Important Changes to Procurement Standards in 2 C.F.R. Part 200
OMB recently updated various parts of Title 2 of the Code of Federal Regulations, among
them, the procurement standards. States are now required to follow the socioeconomic steps
in soliciting small and minority businesses, women’s business enterprises, and labor surplus
area firms per 2 C.F.R. § 200.321. All non-federal entities should also, to the greatest extent
practicable under a federal award, provide a preference for the purchase, acquisition, or use
of goods, products, or materials produced in the United States per 2 C.F.R. § 200.322. More
information on OMB’s revisions to the federal procurement standards can be found in
Purchasing Under a FEMA Award: OMB Revisions Fact Sheet.
The recognized procurement methods in 2 C.F.R. § 200.320 have been reorganized into
informal procurement methods, which include micro-purchases and small purchases; formal
procurement methods, which include sealed bidding and competitive proposals; and
noncompetitive procurements. The federal micro-purchase threshold is currently $10,000,
and non-state entities may use a lower threshold when using micro-purchase procedures
under a FEMA award. If a non-state entity wants to use a micro-purchase threshold higher
than the federal threshold, it must follow the requirements of 2 C.F.R. § 200.320(a)(1)(iii)-
(v). The federal simplified acquisition threshold is currently $250,000, and a non-state entity
may use a lower threshold but may not exceed the federal threshold when using small
purchase procedures under a FEMA award. See 2 C.F.R. § 200.1 (citing the definition of
simplified acquisition threshold from 48 C.F.R. Part 2, Subpart 2.1).
See 2 C.F.R. §§ 200.216, 200.471, and Appendix II as well as section D.13.a of the NOFO
regarding prohibitions on covered telecommunications equipment or services.
b. Competition and Conflicts of Interest
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
49
Among the requirements of 2 C.F.R. § 200.319(b) applicable to all non-federal entities other
than states, in order to ensure objective contractor performance and eliminate unfair
competitive advantage, contractors that develop or draft specifications, requirements,
statements of work, or invitations for bids or requests for proposals must be excluded from
competing for such procurements. FEMA considers these actions to be an organizational
conflict of interest and interprets this restriction as applying to contractors that help a non-
federal entity develop its grant application, project plans, or project budget. This prohibition
also applies to the use of former employees to manage the grant or carry out a contract when
those former employees worked on such activities while they were employees of the non-
federal entity.
Under this prohibition, unless the non-federal entity solicits for and awards a contract
covering both development and execution of specifications (or similar elements as described
above), and this contract was procured in compliance with 2 C.F.R. §§ 200.317 – 200.327,
federal funds cannot be used to pay a contractor to carry out the work if that contractor also
worked on the development of those specifications. This rule applies to all contracts funded
with federal grant funds, including pre-award costs, such as grant writer fees, as well as post-
award costs, such as grant management fees.
Additionally, some of the situations considered to be restrictive of competition include, but
are not limited to:
Placing unreasonable requirements on firms for them to qualify to do business;
Requiring unnecessary experience and excessive bonding;
Noncompetitive pricing practices between firms or between affiliated companies;
Noncompetitive contracts to consultants that are on retainer contracts;
Organizational conflicts of interest;
Specifying only a “brand name” product instead of allowing “an equal” product to be
offered and describing the performance or other relevant requirements of the
procurement; and
Any arbitrary action in the procurement process.
Per 2 C.F.R. § 200.319(c), non-federal entities other than states must conduct procurements
in a manner that prohibits the use of statutorily or administratively imposed SLTT
geographical preferences in the evaluation of bids or proposals, except in those cases where
applicable federal statutes expressly mandate or encourage geographic preference. Nothing in
this section preempts state licensing laws. When contracting for architectural and engineering
services, geographic location may be a selection criterion provided its application leaves an
appropriate number of qualified firms, given the nature and size of the project, to compete for
the contract.
Under 2 C.F.R. § 200.318(c)(1), non-federal entities other than states are required to maintain
written standards of conduct covering conflicts of interest and governing the actions of their
employees engaged in the selection, award, and administration of contracts. No employee,
officer, or agent may participate in the selection, award, or administration of a contract
supported by a federal award if he or she has a real or apparent conflict of interest.
Such conflicts of interest would arise when the employee, officer or agent, any member of
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
50
his or her immediate family, his or her partner, or an organization that employs or is about to
employ any of the parties indicated herein, has a financial or other interest in or a tangible
personal benefit from a firm considered for a contract. The officers, employees, and agents of
the non-federal entity may neither solicit nor accept gratuities, favors, or anything of
monetary value from contractors or parties to subcontracts. However, non-federal entities
may set standards for situations in which the financial interest is not substantial, or the gift is
an unsolicited item of nominal value. The standards of conduct must provide for disciplinary
actions to be applied for violations of such standards by officers, employees, or agents of the
non-federal entity.
Under 2 C.F.R. 200.318(c)(2), if the recipient or subrecipient (other than states) has a parent,
affiliate, or subsidiary organization that is not a state, local, tribal, or territorial government,
the non-federal entity must also maintain written standards of conduct covering
organizational conflicts of interest. In this context, organizational conflict of interest means
that because of a relationship with a parent company, affiliate, or subsidiary organization, the
non-federal entity is unable or appears to be unable to be impartial in conducting a
procurement action involving a related organization. The non-federal entity must disclose in
writing any potential conflicts of interest to FEMA or the pass-through entity in accordance
with applicable FEMA policy.
c. Supply Schedules and Purchasing Programs
Generally, a non-federal entity may seek to procure goods or services from a federal supply
schedule, state supply schedule, or group purchasing agreement.
I. G ENERAL SERVICES ADMINISTRATION SCHEDULES
States, tribes, and local governments, and any instrumentality thereof (such as local
education agencies or institutions of higher education) may procure goods and services from
a General Services Administration (GSA) schedule. GSA offers multiple efficient and
effective procurement programs for state, tribal, and local governments, and instrumentalities
thereof, to purchase products and services directly from pre-vetted contractors. The GSA
Schedules (also referred to as the Multiple Award Schedules and the Federal Supply
Schedules) are long-term government-wide contracts with commercial firms that provide
access to millions of commercial products and services at volume discount pricing.
Information about GSA programs for states, tribes, and local governments, and
instrumentalities thereof, can be found at https://www.gsa.gov/resources-for/programs-for-
State-and-local-governments and https://www.gsa.gov/buying-selling/purchasing-
programs/gsa-schedules/schedule-buyers/state-and-local-governments.
For tribes, local governments, and their instrumentalities that purchase off of a GSA
schedule, this will satisfy the federal requirements for full and open competition provided
that the recipient follows the GSA ordering procedures; however, tribes, local governments,
and their instrumentalities will still need to follow the other rules under 2 C.F.R. §§ 200.317
– 200.327, such as solicitation of minority businesses, women’s business enterprises, small
businesses, or labor surplus area firms (§ 200.321), domestic preferences (§ 200.322),
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
51
contract cost and price (§ 200.324), and required contract provisions (§ 200.327 and
Appendix II).
II. O THER SUPPLY SCHEDULES AND PROGRAMS
For non-federal entities other than states, such as tribes, local governments, and nonprofits,
that want to procure goods or services from a state supply schedule, cooperative purchasing
program, or other similar program, in order for such procurements to be permissible under
federal requirements, the following must be true:
The procurement of the original contract or purchasing schedule and its use by the
non-federal entity complies with state and local law, regulations, and written
procurement procedures;
The state or other entity that originally procured the original contract or purchasing
schedule entered into the contract or schedule with the express purpose of making it
available to the non-federal entity and other similar types of entities;
The contract or purchasing schedule specifically allows for such use, and the work to
be performed for the non-federal entity falls within the scope of work under the
contract as to type, amount, and geography;
The procurement of the original contract or purchasing schedule complied with all the
procurement standards applicable to a non-federal entity other than states under at 2
C.F.R. §§ 200.317 – 200.327; and
With respect to the use of a purchasing schedule, the non-federal entity must follow
ordering procedures that adhere to applicable state, tribal, and local laws and
regulations and the minimum requirements of full and open competition under 2
C.F.R. Part 200.
If a non-federal entity other than a state seeks to use a state supply schedule, cooperative
purchasing program, or other similar type of arrangement, FEMA recommends the recipient
discuss the procurement plans with its regional FEMA Grant Program Manager / Specialist.
d. Procurement Documentation
Per 2 C.F.R. § 200.318(i), non-federal entities other than states and territories are required to
maintain and retain records sufficient to detail the history of procurement covering at least
the rationale for the procurement method, selection of contract type, contractor selection or
rejection, and the basis for the contract price. States and territories are encouraged to
maintain and retain this information as well and are reminded that in order for any cost to be
allowable, it must be adequately documented per 2 C.F.R. § 200.403(g).
Examples of the types of documents that would cover this information include but are not
limited to:
Solicitation documentation, such as requests for quotes, invitations for bids, or
requests for proposals;
Responses to solicitations, such as quotes, bids, or proposals;
Pre-solicitation independent cost estimates and post-solicitation cost/price analyses on
file for review by federal personnel, if applicable;
Contract documents and amendments, including required contract provisions; and
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
52
Other documents required by federal regulations applicable at the time a grant is
awarded to a recipient.
• Additional information on required procurement records can be found on pages 24-26
of the PDAT Field Manual.
7. FEMA Financial Assistance Programs for Infrastructure
Build America, Buy America Act
Recipients and subrecipients must comply with the Build America, Buy America Act
(BABAA), which was enacted as part of the Infrastructure Investment and Jobs Act §§
70901-70927, Pub. L. No. 117-58 (2021); and Executive Order 14005, Ensuring the Future is
Made in All of America by All of America’s Workers. See also 2 C.F.R. Part 184 and OMB
MemorandumM-24-02, Implementation Guidance on Application of Buy America
Preference in Federal Financial Assistance Programs for Infrastructure.
Section 70914 of BABAA requires all federal agencies, including FEMA, to ensure that none
of the funds provided under this program may be used for a project for infrastructure unless
the iron and steel, manufactured products, and construction materials used in that
infrastructure are produced in the United States. For FEMA financial assistance programs,
these requirements apply to new infrastructure awards made on or after January 2, 2023, as
well as new funding FEMA obligates to existing awards or through renewal awards on or
after January 2, 2023.
The Buy America preference only applies to articles, materials, and supplies that are
consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not
apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the
construction site and removed at or before the completion of the infrastructure project. Nor
does a Buy America preference apply to equipment and furnishings, such as movable chairs,
desks, and portable computer equipment, that are used at or within the finished infrastructure
project but are not an integral part of the structure or permanently affixed to the infrastructure
project.
To see whether a particular FEMA federal financial assistance program is considered an
infrastructure program and thus required to include a Buy America preference, please see
Programs and Definitions: Build America, Buy America Act | FEMA.gov.
To ensure compliance with BABAA, all recipient and subrecipient contracts under FEMA
infrastructure awards must include a contract provision explaining the BABAA requirements
and a self-certification where the contracts can certify compliance with the domestic
preference requirements, unless the BABAA requirement is waived by FEMA. Please see
Buy America Preference in FEMA Financial Assistance Programs for Infrastructure FEMA
Interim Policy #207-22-0001.
a. Waivers
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
53
When necessary, recipients (and subrecipients through their pass-through entity) may
apply for, and FEMA may grant, a waiver from these requirements.
A waiver of the domestic content procurement preference may be granted by the
agency awarding official if FEMA determines that:
1) Applying the domestic content procurement preference would be inconsistent
with the public interest.
2) The types of iron, steel, manufactured products, or construction materials are not
produced in the United States in sufficient and reasonably available quantities or
of a satisfactory quality.
3) The inclusion of iron, steel, manufactured products, or construction materials
produced in the United States will increase the cost of the overall project by more
than 25%.
Prior to requesting a waiver, recipients and subrecipients should consider whether a
FEMA approved general applicability waiver applies to their projects. The term
“general applicability waiver” refers to a waiver that applies generally across multiple
awards and do not require a separate application or approval by FEMA prior to use.
These may cover categories of products known to be unavailable domestically or are
intended to ease the burden of compliance. For a list of FEMA’s general applicability
waivers, and for additional information on FEMA’s process for requesting a project-
specific waiver from the Buy America preference requirements, please see FEMA’s
website at: "Buy America" Preference in FEMA Financial Assistance Programs for
Infrastructure | FEMA.gov.
b. Definitions
For BABAA specific definitions, please refer to the FEMA Buy America website at:
Programs and Definitions: Build America, Buy America Act | FEMA.gov.
c. Please refer to the applicable DHS Standard Terms & Conditions for the BABAA
specific term applicable to all FEMA financial assistance awards for infrastructure.
8. Record Retention
a. Record Retention Period
Financial records, supporting documents, statistical records, and all other non-Federal entity
records pertinent to a federal award generally must be maintained for at least three years
from the date the final FFR is submitted. See 2 C.F.R. § 200.334. Further, if the recipient
does not submit a final FFR and the award is administratively closed, FEMA uses the date of
administrative closeout as the start of the general record retention period.
The record retention period may be longer than three years or have a different start date
in certain cases. These include:
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
54
Records for real property and equipment acquired with Federal funds must be
retained for three years after final disposition of the property. See 2 C.F.R. §
200.334(c).
If any litigation, claim, or audit is started before the expiration of the three-year
period, the records must be retained until all litigation, claims, or audit findings
involving the records have been resolved and final action taken. See 2 C.F.R. §
200.334(a).
The record retention period will be extended if the non-federal entity is notified
in writing of the extension by FEMA, the cognizant or oversight agency for audit, or
the cognizant agency for indirect costs, or pass-through entity. See 2 C.F.R. §
200.334(b).
Where FEMA requires recipients to report program income after the period of
performance ends, the program income record retention period begins at the end
of the recipient’s fiscal year in which program income is earned. See 2 C.F.R. §
200.334(e).
For indirect cost rate computations and proposals, cost allocation plans, or any similar
accounting computations of the rate at which a particular group of costs is chargeable
(such as computer usage chargeback rates or composite fringe benefit rates), the start
of the record retention period depends on whether the indirect cost rate documents
were submitted for negotiation. If the indirect cost rate documents were submitted
for negotiation, the record retention period begins from the date those
documents were submitted for negotiation. If indirect cost rate documents were not
submitted for negotiation, the record retention period begins at the end of the
recipient’s fiscal year or other accounting period covered by that indirect cost
rate. See 2 C.F.R. § 200.334(f).
b. Types of Records to Retain
FEMA requires that non-federal entities maintain the following documentation for federally
funded purchases:
Specifications
Solicitations
Competitive quotes or proposals
Basis for selection decisions
Purchase orders
Contracts
Invoices
Cancelled checks
Non-federal entities should keep detailed records of all transactions involving the grant.
FEMA may at any time request copies of any relevant documentation and records, including
purchasing documentation along with copies of cancelled checks for verification. See, e.g., 2
C.F.R. §§ 200.318(i), 200.334, 200.337.
In order for any cost to be allowable, it must be adequately documented per 2 C.F.R. §
200.403(g). Non-federal entities who fail to fully document all purchases may find their
expenditures questioned and subsequently disallowed.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
55
9. Actions to Address Noncompliance
Non-federal entities receiving financial assistance funding from FEMA are required to
comply with requirements in the terms and conditions of their awards or subawards,
including the terms set forth in applicable federal statutes, regulations, NOFOs, and policies.
Throughout the award lifecycle or even after an award has been closed, FEMA or the pass-
through entity may discover potential or actual noncompliance on the part of a recipient or
subrecipient. This potential or actual noncompliance may be discovered through routine
monitoring, audits, closeout, or reporting from various sources.
In the case of any potential or actual noncompliance, FEMA may place special conditions on
an award per 2 C.F.R. §§ 200.208 and 200.339, FEMA may place a hold on funds until the
matter is corrected, or additional information is provided per 2 C.F.R. § 200.339, or it may do
both. Similar remedies for noncompliance with certain federal civil rights laws are authorized
pursuant to 44 C.F.R. Parts 7 and 19.
In the event the noncompliance is not able to be corrected by imposing additional conditions
or the recipient or subrecipient refuses to correct the matter, FEMA might take other
remedies allowed under 2 C.F.R. § 200.339. These remedies include actions to disallow
costs, recover funds, wholly or partly suspend, or terminate the award, initiate suspension,
and debarment proceedings, withhold further federal awards, or take other remedies that may
be legally available. For further information on termination due to noncompliance, see the
section on Termination Provisions in the NOFO.
FEMA may discover and take action on noncompliance even after an award has been closed.
The closeout of an award does not affect FEMA’s right to disallow costs and recover funds
as long the action to disallow costs takes place during the record retention period. See 2
C.F.R. §§ 200.334, 200.345(a). Closeout also does not affect the obligation of the non-federal
entity to return any funds due as a result of later refunds, corrections, or other transactions. 2
C.F.R. § 200.345(a)(2).
The types of funds FEMA might attempt to recover include, but are not limited to, improper
payments, cost share reimbursements, program income, interest earned on advance payments,
or equipment disposition amounts.
FEMA may seek to recover disallowed costs through a Notice of Potential Debt Letter, a
Remedy Notification, or other letter. The document will describe the potential amount owed,
the reason why FEMA is recovering the funds, the recipient’s appeal rights, how the amount
can be paid, and the consequences for not appealing or paying the amount by the deadline.
If the recipient neither appeals nor pays the amount by the deadline, the amount owed will
become final. Potential consequences if the debt is not paid in full or otherwise resolved by
the deadline include the assessment of interest, administrative fees, and penalty charges;
administratively offsetting the debt against other payable federal funds; and transferring the
debt to the U.S. Department of the Treasury for collection.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
56
FEMA notes the following common areas of noncompliance for FEMA’s grant programs:
Insufficient documentation and lack of record retention.
Failure to follow the procurement under grants requirements.
Failure to submit closeout documents in a timely manner.
Failure to follow EHP requirements.
Failure to comply with the POP deadline.
10. Audits
FEMA grant recipients are subject to audit oversight from multiple entities including the
DHS OIG, the GAO, the pass-through entity, or independent auditing firms for single audits,
and may cover activities and costs incurred under the award. Auditing agencies such as the
DHS OIG, the GAO, and the pass-through entity (if applicable), and FEMA in its oversight
capacity, must have access to records pertaining to the FEMA award. Recipients and
subrecipients must retain award documents for at least three years from the date the final
FFR is submitted, and even longer in many cases subject to the requirements of 2 C.F.R. §
200.334. In the case of administrative closeout, documents must be retained for at least three
years from the date of closeout, or longer subject to the requirements of 2 C.F.R. § 200.334.
If documents are retained longer than the required retention period, the DHS OIG, the GAO,
and the pass-through entity, as well as FEMA in its oversight capacity, have the right to
access these records as well. See 2 C.F.R. §§ 200.334, 200.337.
Additionally, non-federal entities must comply with the single audit requirements at 2 C.F.R.
Part 200, Subpart F. Specifically, non-federal entities, other than for-profit subrecipients, that
expend $750,000 or more in federal awards during their fiscal year must have a single or
program-specific audit conducted for that year in accordance with Subpart F. 2 C.F.R. §
200.501. A single audit covers all federal funds expended during a fiscal year, not just FEMA
funds. The cost of audit services may be allowable per 2 C.F.R. § 200.425, but non-federal
entities must select auditors in accordance with 2 C.F.R. § 200.509, including following the
proper procurement procedures. For additional information on single audit reporting
requirements, (See F.4c,”Additional Reporting Requirements” or other applicable document).
The objectives of single audits are to:
Determine if financial statements conform to generally accepted accounting
principles (GAAP);
Determine whether the schedule of expenditures of federal awards is presented fairly;
Understand, assess, and test the adequacy of internal controls for compliance with
major programs; and
Determine if the entity complied with applicable laws, regulations, and contracts or
grants.
For single audits, the auditee is required to prepare financial statements reflecting its
financial position, a schedule of federal award expenditures, and a summary of the status of
prior audit findings and questioned costs. The auditee also is required to follow up and take
appropriate corrective actions on new and previously issued but not yet addressed audit
findings. The auditee must prepare a corrective action plan to address the new audit findings.
2 C.F.R. §§ 200.508, 200.510, 200.511.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
57
Non-federal entities must have an audit conducted, either single or program-specific, of their
financial statements and federal expenditures annually or biennially pursuant to 2 C.F.R. §
200.504. Non-federal entities must also follow the information submission requirements of 2
C.F.R. § 200.512, including submitting the audit information to the Federal Audit
Clearinghouse within the earlier of 30 calendar days after receipt of the auditor’s report(s) or
nine months after the end of the audit period. The audit information to be submitted include
the data collection form described at 2 C.F.R. § 200.512(c) and Appendix X to 2 C.F.R. Part
200 as well as the reporting package described at 2 C.F.R. § 200.512(b).
The non-federal entity must retain one copy of the data collection form and one copy of the
reporting package for three years from the date of submission to the Federal Audit
Clearinghouse. 2 C.F.R. § 200.512; see also 2 C.F.R. § 200.517 (setting requirements for
retention of documents by the auditor and access to audit records in the auditor’s possession).
FEMA, the DHS OIG, the GAO, and the pass-through entity (if applicable), as part of
monitoring or as part of an audit, may review a non-federal entity’s compliance with the
single audit requirements. In cases of continued inability or unwillingness to have an audit
conducted in compliance with 2 C.F.R. Part 200, Subpart F, FEMA, and the pass-through
entity, if applicable, are required to take appropriate remedial action under 2 C.F.R. §
200.339 for noncompliance, pursuant to 2 C.F.R. § 200.505.
11. Payment Information
FEMA uses the Direct Deposit/Electronic Funds Transfer (DD/EFT) method of payment to
recipients.
Payment requests are submitted through FEMA GO.
12. Whole Community Preparedness
Preparedness is a shared responsibility that calls for the involvement of everyone—not just
the government—in preparedness efforts. By working together, everyone can help keep the
nation safe from harm and help keep it resilient when struck by hazards, such as natural
disasters, acts of terrorism, and pandemics.
Whole Community includes:
Individuals and families, including those with access and functional needs
Businesses
Faith-based and community organizations
Nonprofit groups
Schools and academia
Media outlets
All levels of government, including state, local, tribal, territorial, and federal partners
The phrase “Whole Community” often appears in preparedness materials, as it is one of the
guiding principles. It means two things:
1. Involving people in the development of national preparedness documents.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
58
2. Ensuring their roles and responsibilities are reflected in the content of the materials.
13. Example Mitigation Plan Extension Request Template
Mitigation Plan Extraordinary Circumstances Request - Applicant Template (States)
[Appropriate Branch Chief or FEMA Program Officer]
National Dam Safety Program
Federal Emergency Management Agency
[Office Address Street]
[Office City, State Zip]
Submitted via FEMA GO
Reference: Request approval of 12-month extension to update the approved mitigation plan
under “Mitigation Plan Extraordinary Circumstances” in order to receive funding under the
Rehabilitation of High Hazard Potential Dams Grant Program
Dear (Insert Name):
The [insert Applicant name] in consultation and coordination with [insert name of agency/ies
responsible for updating the approved local or tribal mitigation plan (compliant with 44 C.F.R.
Part 201 and Local Mitigation Planning Policy Guide (FEMA, April 2022) or subsequent update
or Tribal Mitigation Plan Review Guide (December 2017)) either for the subrecipient or for the
jurisdiction where the dam is located] requests approval for the Mitigation Plan Extraordinary
Circumstances extension as stated on page [Insert page number] of the Rehabilitation of High
Hazard Potential Dams (HHPD) Grant Program Notice of Funding Opportunity (NOFO).
[For local or tribal mitigation plan(s) where the dam is located that require updates, insert the
following text]
With respect to the following local and/or tribal government and/or nonprofit organization
subrecipients, I/we have included the documentation requested on page [Insert page number] of
the NOFO (6.c.) to request an extension to the approved local or tribal mitigation plan
requirements (compliant with 44 C.F.R. Part 201 and Local Mitigation Planning Policy Guide
(FEMA, April 2022) or subsequent update or Tribal Mitigation Plan Review Guide (December
2017)) for the jurisdiction where the dam is located in order to receive HHPD funding. We
understand, if our request is approved, that the following currently approved local and/or tribal
mitigation plans for the jurisdiction where the dam is located will need to be updated to address
all dam risks in accordance with requirements set forth in the Local Mitigation Planning Policy
Guide (FEMA, April 2022), which supersede the requirements set forth in the Rehabilitation of
High Hazard Potential Dams Grant Program Guidance (FEMA, June 2020) and the FEMA
Policy 104- 008-7 within twelve (12) months from the date FEMA Grants Program Directorate
approves the SOW package in FEMA GO or FEMA may terminate the award or explore other
remedies as appropriate as described on page x of the NOFO:
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
59
• [Insert list]
If you have any questions, please contact me at [insert phone # and email address].
Sincerely,
[Recipient name, title]; and
[State Hazard Mitigation Officer or state mitigation planner name, title]; and
[Agency Responsible for Updating subrecipient HM Plan where the dam is located name, title]
cc: FEMA Regional National Dam Safety Program Point of Contact
Attachments:
• Approach, schedule, and milestones (workplan) for updating approved local or tribal mitigation
plan(s) to include all dam risks to include the requirements set forth in the Local Mitigation
Planning Policy Guide (FEMA, April 2022), which supersede the requirements set forth in the
Rehabilitation of High Hazard Potential Dams Grant Program Guidance (FEMA, June 2020) and
the FEMA Policy 104- 008-7, including allowing time for FEMA review and approval
• Documentation supporting the determination of Extraordinary Circumstances for each
subrecipient
14. Examples Using Funding Formula
The following example demonstrates the funding formula. Assume eleven states apply for
funding in a given year, with the number of eligible dams as shown in Table 1.
Table 1: Example – Number Eligible
Number of States Dams
and Eligible Dams
State
State 1 3
State 2 10
State 3 2
State 4 5
State 5 8
State 6 7
State 7 14
State 8 6
State 9 4
State 10 9
State 11 5
Total Eligible Dams 73
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
60
Step [i]. Using the funding formula, 1/3 of the $11,640,000.00 in available funding
($3,880,000.00) would be divided evenly between the eleven states, totaling $352,727.27 to each
of the eleven states.
Step [ii]. There are a total of 73 eligible dams in the eleven states that submitted applications.
The remaining 2/3 of the available funding ($7,760,000.00) would be distributed as shown:
Table 2: Example – Ratio of State’s Eligible Resulting Funding
Resulting Funding Using Dams to All Eligible
Formula State Dams
State 1 3/73 $352,727.27 +
$7,760,000.00 x (3/73) =
$671,631.39
State 2 10/73 $352,727.27 +
$7,760,000.00 x (10/73) =
$1,415,740.98
State 3 2/73 $352,727.27 +
$7,760,000.00 x (2/73) =
$565,330.01
State 4 5/73 $352,727.27 +
$7,760,000.00 x (5/73) =
$884,234.12
State 5 8/73 $352,727.27 +
$7,760,000.00 x (8/73) =
$1,203,138.23
State 6 7/73 $352,727.27 +
$7,760,000.00 x (7/73) =
$1,096,836.86
State 7 14/73 $352,727.27 +
$7,760,000.00 x (14/73) =
$1,840,946.45
State 8 6/73 $352,727.27 +
$7,760,000.00 x (6/73) =
$990,535.49
State 9 4/73 $352,727.27 +
$7,760,000.00 x (4/73) =
$777,932.75
State 10 9/73 $352,727.27 +
$7,760,000.00 x (9/73) =
$1,309,439.6
State 11 5/73 $352,727.27 +
$7,760,000.00 x (5/73) =
$884,234.12
Maximum Funding Amounts. Using the example provided, the maximum amount that could be
awarded to any subrecipient in FY20 is $1,250,000. Using the funding formula, the resulting
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
61
funding for State 7 exceeded the maximum amount, so State 7 would still receive $1,840,946.45.
However, no subrecipient would be awarded more than $1,250,000.
A state may have multiple subrecipients; if the amount of funding is not sufficient for all eligible
subrecipients, the state will have to prioritize dams using their discretion, and other eligibility
factors such as the subrecipient’s ability to meet the non-Federal cost share, to choose which
subrecipients to fund.
Example (use Table 2 above): Assume State 2 submitted five (5) activities with their
application. Assume the cost estimates for each activity are as follows: $200,000 for Activity 1,
$500,000 for Activity 2, $600,000 for Activity 3, $400,000 for Activity 4, and $1,000,000 for
Activity 5. FEMA reviewed the five activities and determined that Activity 1 is not eligible for
funding. State 2 must use the risk-based prioritization method to determine which of the
remaining four eligible activities (Activities 2-5) to fund. Note that some of the activities may
not be fully funded.
15. Determination of Unacceptable Risk to the Public
For purposes of the HHPD, the determination of unacceptable risk to the public is to be made by
the state dam safety program, the agency of the state that is authorized by state statute to manage
the state participation in the NDSP. See Section H.19., Definitions, for the definitions of
unacceptable risk to the public and official regulatory notice.
16. Eligible Activities
FEMA will evaluate proposed activities for eligibility. Eligible activities include repair, removal,
or any other structural or nonstructural measures to rehabilitate an eligible high hazard potential
dam. Note that all eligible activities included in the list must also have eligible subrecipients that
can meet the cost-share requirements and the other eligible subrecipient requirements.
For the purposes of this grant program, the activities shown in Table 3 could qualify for funding.
The activities are categorized into three types of activities: planning, design, and construction.
This list is not exhaustive; other activities may also be eligible.
• Planning Activities - Planning activities include investigations and risk assessments that
further define the dam risk. Planning activities should include alternatives analysis to identify a
preferred plan for dam rehabilitation and the estimated cost for design and construction. For
project planning, the alternatives should involve the preparation of preliminary hydrologic and
hydraulic modeling to address the regulations of the state and local governments for alterations
in floodplain areas as well as the minimum requirements of the NFIP. The local community
should be consulted during the alternative identification and selection process to address local
planning, zoning, and floodplain management regulations. Potential environmental impacts
should also be considered in the selection of the preferred plan. Early coordination with EHP
should be conducted to address applicable environmental requirements.
• Design Activities – Design activities include work to develop conceptual, preliminary, or final
design plans and specifications for dam rehabilitation projects that have been planned using an
alternative evaluation process that complies with NEPA requirements. Coordination with EHP
during the design should be conducted to confirm that the design complies with NEPA
requirements. Detailed hydrologic and hydraulic modeling should be performed for use in
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
62
designing the dam rehabilitation and to address the permit requirements of the state and local
government as well as the minimum requirements of the NFIP. For all projects located in Special
Flood Hazard Areas on FEMA Flood Insurance Rate Maps, a FEMA conditional review of the
project design for compliance with NFIP requirements should be conducted through the process
outlined in 44 C.F.R. § 65.8. The design effort should include obtaining all state, local, and
federal permits for approval to construct the project in the floodplain and to meet all
environmental requirements.
Note that all grant-funded activities must comply with Federal Environmental Planning and
Historic Preservation (EHP) regulations. See Section F.3.c., Environmental Planning and
Historic Preservation (EHP) Compliance, for more information about EHP Compliance.
Table 3: Examples of Eligible Scope of Work Activities
Category Eligible Scope of Work Activities FPMP
Requirement
Y/N
Staff
Notes/Comments
Planning • Development of evacuation plans,
plans for flood fighting, or community
response plans to include in the
floodplain management plan
• Coordination of EAP and EOPs for
different release conditions
N
Planning • Activities and studies that determine
risks associated with eligible dams
• Environmental studies for NEPA
compliance
• Development of operation and
maintenance plans
N
Planning • Public education and awareness of
flood risks associated with the eligible
dam project
N
Planning • Dam risk and consequence
assessments Feasibility studies
• Preliminary engineering studies
Alternatives analysis
• Mapping, engineering survey, and
inundation modeling
Y
Design • Engineering design
• Development of specifications
Y
Construction • Repair or rehabilitation of the dam
• Dam removal
• Construction monitoring
• Installation of early warning systems
associated with the eligible dam
project
Y
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
63
17. Floodplain Management Plan
To be eligible for HHPD, subrecipients must have in place (or will be developed not later than 2
years after the date of execution of a dam rehabilitation or removal project agreement and
implemented not later than 2 years after the date of completion of a project) a floodplain
management plan to reduce the impacts of future flood events in the area impacted by the
project. The floodplain management plan (FPMP) shall address:
a. potential measures, practices, and policies to reduce loss of life, injuries, damage to
property and facilities, public expenditures, and other adverse impacts of flooding in the
area protected by the project;
b. plans for flood fighting and evacuation; and
c. public education risk communication targeting communities in the inundation area.
The purpose of the FPMP is to specifically address the impacts of the dam or dams for which an
HHPD grant has been awarded. It is intended to function as a stand-alone plan that does not
modify the floodplain ordinance in effect to comply with the NFIP. The following information
must be addressed in the FPMP:
The development of the FPMP should be a shared responsibility of the subrecipient and local
government with authority to implement policies that protect the public and regulate
development. The FPMP development should include the involvement of key partners and
stakeholders including representatives of the local government emergency managers, first
responders and planners, state agencies including dam safety and state hazard mitigation office,
as well as technical resources afforded by federal agencies such as the USACE and the NRCS.
Therefore, the FPMP should include a formalized stakeholder involvement process to obtain
input from key partners and stakeholders leading to adoption of the FPMP by the governing body
impacted by the dam rehabilitation. The FPMP must address the following:
A. Potential measures to reduce the adverse impacts of flooding
1. Evaluation of the flood hazards with and without the dam rehabilitation measures
a. Identification of the reach of stream downstream and upstream of the dam for which
flooding is impacted by the rehabilitation. This defines the study area as well as the local
governments that should be consulted
b. Identification of the impacts of the dam rehabilitation on the flood elevations for a range
of frequent and infrequent flood events.
i. Does the dam rehabilitation maintain or decrease the level of flood protection for the
1% flood (designed flood prevention or non-designed incidental)?
ii. Does the dam rehabilitation increase the flood flows to downstream areas for a range
of recurrence interval events including the 2-, 10-, 25-, 50-, 100-, and 500-year events?
iii.Does the dam rehabilitation impact the operational releases form the dam during rain
events?
iv.For dam removal projects, the removal of the dam may increase the magnitude and
timing of flood flows to downstream areas. Any adverse impacts on a range of
frequent
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
64
2. What are the consequences related to the adverse impacts identified in 1 above?
a. Number of residential and commercial insurable structures
b. Estimated economic losses due to the flooding event
c. Critical utilities
d. Transportation network
e. Critical facilities
f. Local governmental public expenditures for operations to prepare for and recover in the
event of flooding
3. What mitigation actions will be implemented by the local governments to address both the
adverse impacts resulting from the dam rehabilitation (if any) such as:
a. Structural modification to the stream conveyance system
b. Nonstructural measures including:
i. Floodproofing of structures
ii. Building standards to account for increased depth or velocity
4. What mitigation actions will be implemented by the local governments to address residual
risk not resolved by item 3 above:
a. What actions and policies will be implemented address flood risk attributable to the
adverse impacts of dam rehabilitation that could not be mitigated?
b. What actions and policies that will be implemented to address residual flood risk not
associated with the adverse impacts of the dam rehabilitation.
c. The mitigation actions should address the planned schedule for study or implementation.
B. Plan for flood fighting and evacuation
A plan developed by the dam owner in cooperation with the governing local government, local
government emergency managers and first responders should be prepared for flood fighting
activities and evacuation for both operational releases during frequent and infrequent recurrence
interval events as well as potential dam failure scenarios.
1. The plan should be consistent with the Emergency Action Plan for the dam.
2. Using the depth, velocity, and timing information of the modeling of the hydrologic and
hydraulic modeling of the effects of the dam rehabilitation on downstream and
upstream areas, the plan should address the locations of critical facilities, venerable
population, and the transportation network. The locations of flood fighting should be
identified as well as an implementation plan including responsible parties and resources
(stockpile of materials or on-call contractors).
3. The plan should address the value of an early warning system.
4. The evacuation plan should address both shelter in place and horizonal evacuation.
5. The plan should address the frequency for drills and exercises of the flood fighting and
evacuation plan.
C. Public Education and awareness of Flood Risk
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
65
A public education and outreach program should provide information to impacted property
owners and residents in and near the floodplain upstream and downstream of the dam as well as
use the recreational facilities or transportation network susceptible to flooding.
The plan should consider multimedia and social media measures to reach the intended audience
and provide information to determine where to get information for flood hazards, flood warning,
flood evacuation and how to develop their personal flood avoidance plan.
The governing local government should consider evaluation of the extent of floodplains
upstream and downstream of dams in the planning and zoning process for new development that
may be adversely impacted by the dam. Local governments should consider including dam
breach inundation mapping to subdivision plats to provide educate potential buyers of the
potential flood hazard and to encourage location of building lots outside the inundation area.
HHPD projects must comply with 44 CFR Part 9, which requires that actions be consistent with
criteria of the National Flood Insurance Program or any more restrictive Federal, State, or local
floodplain management standard. See 44 CFR 9.11(d)(6). This means that all dam rehabilitation
projects must meet 44 CFR Part 65 and applicable state and local regulations for encroachment
in or alterations of regulatory floodplains in compliance with state laws and local floodplain
management, zoning, and site design regulations.
A dam removal may result in a decrease in the regulatory flood elevations upstream of the dam
and an increase in the regulatory flood elevations downstream of the dam due to loss of flood
storage.
For a grant that funds planning activities, alternatives should be considered for the dam
rehabilitation or dam removal including performing hydrologic and hydraulic studies to
determine the impact of the project on the regulatory flood elevations upstream and downstream
of the dam. The local community for which the dam is located should be consulted to confirm
compliance with the local floodplain management regulations and NFIP regulations.
For a grant that funds design the hydrologic and hydraulic modeling should be updated to reflect
the design and a review of the proposed project should be submitted to FEMA for review and
issuance of a conditional letter of map revision in accordance with 44 C.F.R. §65.8 and
potentially § 65.12 of the NFIP regulations.
18. Definitions
Full list of definitions is available in the Rehabilitation of High Hazard Potential Dams Grant
Program Guidance (FEMA, June 2020).
Administrator
The term “Administrator” means the Administrator of the Federal Emergency Management
Agency.
Board
The term “Board” means a National Dam Safety Review Board established under section 467f(f)
of this title.
Budget Period (Source 2 C.F.R. 200.1)
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
66
Budget Period means the time interval from the start date of a funded portion of an award to the
end date of that funded portion during which recipients are authorized to expend the funds
awarded, including any funds carried forward or other revisions pursuant to § 200.308.
Dam (Source: 33 USC § 467(3))
The term “dam”—
(A) means any artificial barrier that has the ability to impound water, wastewater, or any liquid-
borne material, for the purpose of storage or control of water, that—
(i) is 25 feet or more in height from—
(I) the natural bed of the stream channel or watercourse measured at the downstream toe of the
barrier; or
(II) if the barrier is not across a stream channel or watercourse, from the lowest elevation of the
outside limit of the barrier; to the maximum water storage elevation; or
(ii) has an impounding capacity for maximum storage elevation of 50 acre-feet or more; but
(B)does not include—
(i)a levee; or
(ii) a barrier described in subparagraph (A) that—
(I) is 6 feet or less in height regardless of storage capacity; or
(II) has a storage capacity at the maximum water storage elevation that is 15 acre-feet or less
regardless of height; unless the barrier, because of the location of the barrier or another physical
characteristic of the barrier, is likely to pose a significant threat to human life or property if the
barrier fails (as determined by the Administrator).
Expected life of the dam
Estimated number of years the rehabilitation will be effective. The expected life for a dam
rehabilitated under the HHPD program is 50 years.
FEMA
The term “FEMA” means the Federal Emergency Management Agency.
Period of Performance (POP) (Source 2 C.F.R. 200.1)
Period of performance means the total estimated time interval between the start of an initial
Federal award and the planned end date, which may include one or more funded portions, or
budget periods. Identification of the period of performance in the Federal award per §
200.211(b)(5) does not commit the awarding agency to fund the award beyond the currently
approved budget period.
Program
The term “Program” means the national dam safety program established under section 467f of
this title.
Subrecipient
A non-federal entity that receives a subaward from a pass-through entity to carry out part of a
federal program; but does not include an individual that is a beneficiary of such program. A
subrecipient may also be a recipient of other federal awards directly from a federal awarding
agency.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
67
The term “eligible subrecipient”, in the case of a project receiving assistance through the HHPD
program, includes—
(A) a governmental organization; and
(B) a nonprofit organization
19. Appendices
Appendix A: FY24 Performance Measure Targets
Objective Eligible Activities -
Examples
Performance
Measures
FY24 Target Unit
Reduce or eliminate
risk of eligible high
hazard potential dam
(HHPD)
1.1 Planning tasks and
activities, studies and
analysis for pre-
construction phases,
scoping activities, and
permit applications.
1.1 Number of eligible
HHPD dams that have
resulted in the
completion of studies
and analysis for pre-
construction phases,
scoping activities, and
permit applications.
Total number
1.2 Preliminary and 1.2 Number of eligible Total number
final design package HHPD dams that have
and required permit resulted in the
approvals. completion of
preliminary and final
engineering design
package and permits.
1.3 Construction 1.3 Number of eligible Total number
activities that support HHPD dams that result
dam rehabilitation or in construction projects
removal projects. for dam rehabilitation
or removal.
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
68
Appendix B: Performance Progress Report (PPR)
APPENDIX B1: PERFORMANCE PROGRESS REPORT (PPR) TEMPLATE: PART 1
SUMMARY SHEET
PPR Templates are available through your Regional Program Office
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
69
APPENDIX B2: PERFORMANCE PROGRESS REPORT (PPR) TEMPLATE: PART 2
PERFORMANCE METRICS TARGETS
PPR Templates are available through your Regional Program Officer
FY 2024 Fall Rehabilitation of High Hazard Potential Dams (HHPD) NOFOBack to the Top
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
PROCUREMENT - AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 17, 2024
ITEM TITLE:
Title: Engineering Services for Pickleball / Tennis Courts & Parking at South Cove County Park Department(s): PRT Amount: $68,500.00
Contingency (10%): $ 6,850.00
Total: $75,350.00
FINANCIAL IMPACT:
Procurement was approved by Council in Fiscal Year 2024-2025 budget process.
Budget: $75,350.00 Project Cost: $75,350.00 Balance: $0.00 Finance Approval:
BACKGROUND DESCRIPTION:
At the June 1, 2022 meeting, Council approved the award of RFP 20-02 for On Call Engineering Services to Thomas & Hutton of Greenville, SC for
Category E: On Call General Engineering Services. Parks, Recreation, and Tourism wishes to contract with Thomas & Hutton to provide engineering
services for the expansion of the pickleball courts, two new tennis courts, two new parking lots, site plans for new restroom facilities including a septic
system, and enhanced lighting.
South Cove County Park has experienced a remarkable increase in pickleball usage, with the courts reaching full capacity multiple times daily, seven days a
week. This high demand has led to wait times for other patrons. Currently, the pickleball and tennis courts are in the same area, and there is insufficient
parking, with patrons resorting to parking on the grass across from the courts. The proposed expansion will add approximately 12 pickleball courts and 2
tennis courts and approximately 108 parking spaces.
The scope of engineering services includes surveying, site design, master planning, permitting, bidding and award, construction administration, and project
closeout. This project has received approval through Duke Energy and the Federal Energy Regulatory Commission (FERC).
ATTACHMENT(S):
1. Thomas and Hutton Proposal
STAFF RECOMMENDATION:
It is the staff’s recommendation that Council:
1. Approve Engineering Services for the South Cove Pickleball / Tennis Court Expansion, to Thomas and Hutton of Greenville, SC in the amount of
$68,500.00
2. Approve at 10% contingency in the amount of $6,850.00
Submitted or Prepared by: ___________________________________ Approved for Submittal to Council: __________________________________
Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
PROCUREMENT - AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 17, 2024
ITEM TITLE:
Title: Six (6) Fire Apparatuses with Loose Equipment Department(s): Emergency Services Amount: $3,302,535.00
FINANCIAL IMPACT:
Procurement was approved by Council in Final Reading of Ordinance 2024-20 as a separate Agenda Item.
Budget: $3,302,535.00 Project Cost: $3,302,535.00 Balance: $0.00 Finance Approval: ________________________________
Funding per Ordinance 2024-20
1st Reading: August 20, 2024 - Approved 4-0
2nd Reading: September 3, 2024 - Approved 5-0
3rd Reading: September 17, 2024 - Previous item on this September 17, 2024 Meeting Agenda
BACKGROUND DESCRIPTION:
These Fire Apparatuses are FES single -axle pumper/ tankers mounted on Freightli ner M2 112 chassis. These units feature 3/16" all -aluminum bodies and are
equipped with 2,000-gallon polypropylene tanks. They are outfitted with Hale MDP side-mount 1,000 GPM pumps with dump tanks, attack hoses, supply hoses,
and additional loose equipment. Designed for rapid water discharge from three sides, these units feature user-friendly controls both inside the cab and on the side of
the body. These apparatuses will be constructed in compliance with NFPA (National Fire Protection Association) standards.
The advanced pump and attack hose setup is tailored to enhance the operational flexibility for volunteer fire departments, enabling them to initiate fire suppression
efforts prior to the arrival of dedicated attack f ire engines. Given the extensive ar eas of Oconee County lacking fire hydrants, the capacity to transport substantial
quantities of water is essential. These new tankers will enhance operational capabilities alongside the existing tankers in the county’s inventory.
The new apparatus es will be stationed at Keowee Ebenezer, Friendship, West Uni on, Holly Springs, Oakway, and Cleveland Volunteer Fire Departments. The
current tankers stationed at these locations will be reassigned to other stations across Oconee County that currently lack tanker support. Additionally, some of these
stations are using older 1,000-gallon pumpers as tankers, and units that have reached the end of their service life will be retired and sold as surplus.
The County is utilizing the North Carolina Sheriffs Association contract through a cooperative purchasing agreement. The contract discount is 6.7% off the MSRP
of the apparatus and 6% off the MSRP price of options. Safe Industries is offering a 16.9% discount. The Fleet Maintenance Director also approves this purchase.
SPECIAL CONSIDERATIONS OR CONCERNS:
Safe Industries of Easley, SC holds the North Carolina Sheriffs’ Association contract for FES Commercial, Single Axle Tankers, contract number 25-05-0521 /
FES25-05. The North Carolina Sheriff’s Association contract allows all County and City Government Agencies to purchase, from this contract, directly from the
awarded vendors.
ATTACHMENT(S):
1. Pricing Summary spreadsheet for Six (6) Tankers
2. Safe Industries Proposal
3. Pricing Summary – Single Axel Tankers
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
4. Safe Industries Loose Equipment Proposal
5. Pricing Summary – Loose Equipment
6. Single Axel Tanker Specification
7. Single Axel Tanker Drawing
8. NC Sheriffs Association Contract Information, Contract # 25-05-0521 / FES24-05.
STAFF RECOMMENDATION:
It is the staff’s recommendation that Council;
1. Approve the purchase of Six (6) Commercial Single Axle Tankers to Safe Industries of Easley, SC in the amount of $3,302,535.00.
2. Authorize the County Administrator to execute documents for this this purchase.
Submitted or Prepared By:_______________________________Approved for Submittal to Council: ___________________________________
Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator
Quantity Description Unit Cost Extended
6
Single Axle Fire Apparatus
Total for 6 trucks at $518,283.00 is $3,109,698.00 difference in proposed amount and calulation is
$5.00 which resulted from Vendor Rounding $518,283.00 $3,109,695.00
6 Loose Equipment Packages $41,640.00 $249,840.00
6 Tax (IFM Fee) $500.00 $3,000.00
$3,362,535.00
6 Discount for Paying $131,000.00 for each Chasis on Receipt and Approval by FEX -$5,000.00 -$30,000.00
6 Mulitiple Unit Discount for four (4) or more Tankers -$5,000.00 -$30,000.00
Grand Total for 6 Tankers with Loose Equipment $3,302,535.00
Pricing Breakdown Spreadsheet
Six Fire Apparatuses with Loose Equipment
OCONEE COUNTY 2K TANKER
Single Axle Tanker Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05.
PART NO DESCRIPTION LIST PRICE
== Single Axle Tanker - 0.000 == -$
A0-00-0025 FES Standard Shipping Charges - Pumper/Tanker 7,750$
A0-00-0050 FES Standard Engineering Charges - Pumper/Tanker 1,550$
A0-00-0150 *** Proposed - Tanker Spec Boilerplate *** -$
AA-00-0007 Proposed by - Safe - Marler -$
AA-00-0200 Proposed - General Information - NFPA 1900 98$
AA-00-0265 Proposed - Completion Info 98$
AA-00-0300 Proposed - FMVSS Certification -$
AA-00-0320 Proposed - Records -$
AA-00-0440 Proposed - General Construction -$
AA-00-0510 Proposed - Single Line Responsibility - Apparatus Body -$
AA-00-0520 Proposed - Product Liability -$
AA-00-0740 Proposed - Paint Performance Certification -$
AA-00-0930 Proposed - Service Center and Parts Availability -$
AA-00-0950 Proposed Service By - Safe Industries -$
AA-00-1040 Proposed - Prices & Payments - FOB FES -$
AA-00-1210 Proposed - Delivery TIme - Chassis Receipt -$
AA-00-1720 Proposed - Fair, Ethical, and Legal Competition -$
AA-00-1740 Proposed - Non-Collusion Agreement -$
AA-00-2130 Proposed - Material and Workmanship -$
AA-00-2300 Proposed - Sales Engineer -$
AA-00-2550 Proposed - Drawing Submitted with Bid - Tanker 4,647$
AA-00-3840 Proposed - Apparatus Delivery - Customer Pick Up -$
AA-00-4340 Proposed - Instructional Manuals 1,180$
AA-00-4540 Proposed - Vehicle Fluids Plate 218$
AA-00-5850 Proposed - Location of Manufacturing Facility -$
AA-00-6140 Proposed - FAMA Membership -$
AA-00-6230 Proposed - Safe SC Dealer's License -$
AA-00-6545 Proposed - Manufactured in the US -$
AA-00-6970 Proposed - Cooperative Purchasing -$
AA-00-7305 Proposed - 3rd Party Testing -$
AA-00-9000 Proposed - Full Time Service and Warranty Staff -$
AB-00-0815 Mobile Water Supply Fire Apparatus NFPA 2016 Chapters of Compliance -$
AB-00-0930 Vehicle Data Plate Description 217$
AB-00-0945 Proposed Principal Apparatus Dimensions & GVWR -$
AB-00-1010 Critical Overall Height Requirement - No -$
AB-00-1020 Critical Overall Length Requirement - No -$
AD-10-0005 Freightliner Chassis 2DR SA 201,884$
AE-14-0050 Seat Belt Clarification for NFPA -$
AE-14-6320 Stainless Steel Wheel Trim Kits - SA 711$
AE-14-6500 Cab Steps - 2 DR -$
AE-14-6555 FES Custom Fabricated Driver Side Treadplate Cab Step - 2 DR 4,522$
AE-14-6560 FES Custom Fabricated Officer Side Treadplate Cab - 2 DR 2,602$
AE-14-6620 Cab Step Lights- 2 Door 625$
AE-14-7880 Center Console for 2 Door - Brushed 2,106$
AE-14-8480 Install Standard #MATM Antenna 1,001$
AE-14-9025 Tire Pressure Monitoring - LED Valve Stem Caps 6 Tires 189$
AH-02-0000 SA Dryside Tanker - 1250 - 2000 Gallons -$
AH-03-9100 3M Reflective Material - Cab 2 Door - Red/White 282$
AH-04-0000 ***Header - Front Bumper Accessories *** -$
AH-04-0008 Standard Front Bumper Provided by the Chassis Manufacturer -$
AH-04-0655 Two (2) Tow Hooks Provided by the Chassis Manufacturer -$
AJ-00-0025 *** Header - Chassis Electrical, 2DR*** -$
AJ-00-0040 *** Header - Body Electrical - Options *** -$
AJ-01-0005 Electrical System Description -$
AJ-01-0015 12 Volt Electrical System Testing - All Units 480$
AJ-01-0100 Class One Load Management System 4,400$
AJ-01-0200 Class One Voltage Monitoring System - 12 Volt 1,368$
AJ-01-0230 Electrical Harness Installation - 12 Volt 3,095$
AJ-01-0610 Kussmaul Super Auto Eject 20 - 091-55-20-120 845$
AJ-01-0660 Kussmaul Water Proof Super Auto Eject Cover - Red - 091-55RD 236$
Singe Axle Tanker Pricing Sheet Page 1 of 8
OCONEE COUNTY 2K TANKER
Single Axle Tanker Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05.
PART NO DESCRIPTION LIST PRICE
AJ-01-1105 Shoreline Receptacle Label NFPA 350$
AJ-01-1120 Shoreline Location - DS Step Well -$
AJ-01-1320 Kussmaul Charger with Integrated Display 091-266-12-40 1,715$
AJ-01-1860 Kussmaul Auto Pump 12 V 100PSI - 091-9-12V 1,357$
AJ-01-1900 Kussmaul Auto Pump Timer 091-150 550$
AJ-01-1910 Kussmaul Auto Drain For 12V Pump 091-9-131 350$
AJ-02-0033 Switch Console Six (6) Switches 726$
AJ-02-0099 Control Switching Labeling 119$
AJ-02-0350 Door Open Indicator w/ Integral Audible Alarm 277$
AJ-05-0000 *** Header - 12V Power/USB Charging /Power - Ground Circuits*** -$
AJ-05-0208 Blue Sea Fuse Block - 6 Circuit in Center Console 849$
AJ-10-0000 ***Header - Camera Systems *** -$
AJ-10-0315 FRC inView TrueSight Wired - 2 Cam for Dumps, 1 for Rev, 1 Monitor 2,319$
AJ-10-0975 Monitor Mounted in Center Console 296$
AJ-17-0005 Body Electrical System 11,520$
AJ-20-0005 Chassis Marker Lights and Reflectors -$
AJ-20-0025 Marker/Turn Lights at Each Side of Body 590$
AJ-20-0030 Marker/Turn Lights at Rear of Body 507$
AJ-20-0098 Delete License Plate Light at Rear of Body -$
AJ-20-1010 Whelen M6 Stop/Tail/Turn/Back Up Lights W/ Clear Lens in Quad Housing 1,999$
AJ-25-0115 Body Step Lights TecNiq EON-3 LED 610$
AJ-26-0000 *** Header - Hose Bed Lighting *** -$
AJ-26-0035 Hose Bed Light - Front Hose Bed Wall - TecNiq E41 LED 587$
AJ-26-0080 Hose bed Light Switch - Rear Body Panel 330$
AJ-26-0300 Pump Enclosure Work Lights - TecNiq E18 409$
AJ-28-0000 *** Header - Body Scene Lights *** -$
AJ-30-0560 FireTech HiViz Surface Mount Scene Lights - Guardian Elite Rear of Body 2,211$
AJ-30-0570 FireTech HiViz Surface Mount Scene Lights - Guardian Elite Driver Side of Body 2,211$
AJ-30-0575 FireTech HiViz Surface Mount Scene Lights - Guardian Elite Officer Side of Body 2,211$
AJ-32-0015 Control Switch on Pump Panel for Rear of Body Scene Lights 226$
AJ-32-0020 Control Switch in Cab for Rear of Body Scene Lights 226$
AJ-32-0410 Control Switch in Cab for Driver Side of Body Scene Lights 226$
AJ-32-0420 Control Switch on Pump Panel for Driver Side of Body Scene Lights 226$
AJ-32-0510 Control Switch in Cab for Officer Side of Body Scene Lights 226$
AJ-32-0520 Control Switch on Pump Panel for Officer Side of Body Scene Lights 226$
AJ-32-1005 Scene Lights Activated by Reverse 226$
AK-00-0000 *** Header - Brow Lighting *** -$
AK-00-0250 HiViz FireTech - (1) 46" Brow Light - 180W12V LED - Above Windshield 2,328$
AK-05-0015 Control Switches in Cab for Lights Above Windshield - HiVIZ 225$
AK-05-0040 Wire Upgrade for 12V High Amp Light - (1) Brow Light 121$
AM-03-0000 NFPA (2) Ground Lights - TecNiq #E10-WS00-1 LED Below Cab Doors 423$
AM-03-0020 Ground Lights (2) Below Pump Panel Running Board - TecNiq LED E10-WS00-1 423$
AM-03-0033 Ground Lights (2) Below Side Dumps - TecNiq LED E10-WS00-1 423$
AM-03-0038 Ground Lights (2) Below Tailboard - TecNiq LED E10-WS00-1 423$
AM-15-0000 Cab and Body Ground Lights Activate by Engaging Parking Brake 127$
AM-35-0000 ***Header - 12V Body Flood Lighting*** -$
AP-00-0000 *** Header - Compartment Lighting*** -$
AP-05-0005 Compartment Light Activation - Roll Up Doors 212$
AP-10-0400 ROM DuroStrip LED Compartments Lights -$
AP-10-0453 Compt. Lights 30" ROM DuroStrip White LED Track Lighting - Dual - Update QTY!! -$
BA-00-0005 *** NFPA Warning Light Package *** -$
BB-00-0000 NFPA Compliant Warning Light Package - All Units -$
BB-00-0010 Light Package Actuation/ Controls - All Units -$
BB-00-0015 Warning Lights Flash Pattern - NFPA -$
BB-10-0000 Whelen Upper Warning Package - Pumpers & Tankers -$
BC-01-0055 A- Upper Whelen LED F4N2QLED Freedom Series IV 55" Light Bar Front Populated 4,713$
BC-05-0138 C-Upper Whelen M9RC Super LED 1,116$
BC-07-0038 B/D - Upper Rear Whelen M9RC Super LED Series 1,116$
BC-08-0038 B/D - Upper Front Whelen M9RC Super LED Series 1,116$
BD-00-0001 Whelen Lower Warning Package - Pumpers & Tankers -$
BD-01-0035 A-Lower Front Whelen M6RC Super LED 884$
Singe Axle Tanker Pricing Sheet Page 2 of 8
OCONEE COUNTY 2K TANKER
Single Axle Tanker Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05.
PART NO DESCRIPTION LIST PRICE
BD-02-0001 A-Lower Front Mounting - Chassis Grille -$
BD-10-0040 C-Lower Rear Whelen M6RC Super LED 884$
BD-15-0073 B/D - Lower Front Whelen M6RC Super LED 884$
BD-15-9000 B/D - Lower Front Mounting - Chassis Hood -$
BD-20-0105 B/D - Lower Mid - Whelen M6RC Super LED 884$
BD-27-0105 B/D - Lower Rear - Whelen M6RC Super LED 884$
BD-80-0000 Light Package NFPA Certification - All Units -$
BG-00-0000 *** Header - Optional Warning Lights *** -$
BK-05-0000 Whelen LED Traffic Advisor TAL65 36" - Light at Rear of Body 1,162$
BK-09-0005 Traffic Advisor - Recess Mounting on Rear Sheet 115$
CA-00-0003 *** Header - Audible Warning Equipment*** -$
CA-01-0050 Back Up Alarm - 97 dB(A) 292$
CA-02-0000 -$
CA-11-0003 Air Horn Control - DS Foot Swtich & OS Clamshell on Cab Dash 584$
CB-00-0010 Siren - Whelen #295SLSA1, 100W 988$
CB-05-0200 One (1) Whelen SP123BMC Speaker - Driver Side of Front Bumper 545$
DM-04-0000 *** Tankers *** -$
DN-03-0210 Hale MBP-100 1000 GPM Pump - PTO - 6" Inlets Required 31,931$
FC-06-0025 PTO Pump Shift Indicator Lights 370$
FD-00-0500 Aux GearboxCooler - REQ Pump Power Req >200Hp or MBP = 1000 GPM - DBack BOA 361$
FG-00-0000 *** Header - Pressure Relief Valves *** -$
FG-45-0038 Class One "Sentry" Pressure Governor Control "SPG" with Twister 3,385$
FG-50-0000 Class One Stainless Steel Intake Relief Valve -$
FH-00-0000 *** Header - Hale Pump Priming Pump and Controls *** -$
FH-02-0200 Trident "Manual" 2 Barrel Air Pump Priming System - Hale Direct Mount </1000 GPM 1,700$
FI-00-0001 *** Header - Drains & Accessories *** -$
FI-00-0020 12 Port Rotary Master Drain Valve 188$
FI-00-0040 Drains/Bleeder Lift Up at all 1-1/2" or Larger -$
FI-00-0080 Synflex Suction, Discharge, Pressure and Control Lines 384$
FI-00-0118 Alloy Anodes Three (3) Total 787$
FI-00-0900 Delete Thermal Relief Valve -$
FN-00-0015 Side Mount Pump Module 5,990$
FN-00-1030 Pump Module Aluminum Construction -$
FN-00-1130 Delete Dunnage Area -$
FO-00-0010 *** Header - Pump Suctions *** -$
FP-00-0028 Hale Suction Inlets 6" NST 192$
FP-23-5008 Short Neck Main Pump Suction Inlets - DS & OS -$
FP-23-5042 6" NST Main Pump Suction Pressure Vented Cap (2) 639$
FP-33-0040 *** Header - Auxiliary Suction *** -$
FP-35-6220 2 1/2" AUX Suction @ DS Panel to Front of Main Inlet 192$
FP-35-6233 2 1/2" Akron #8800 S.S. Ball Valve - DS Front AUX Suction 96$
FP-35-6240 Swing Control @ Valve DS Front Aux Suction 1,260$
FP-35-6420 2 1/2" AUX Suction @ OS Panel to Front of Main Inlet 192$
FP-35-6433 2 1/2" Akron #8800 S.S. Ball Valve - OS Front AUX Suction 96$
FP-35-6440 Swing Control @ Valve OS Front Aux Suction 1,260$
FP-50-0020 *** Side Mount - Tank to Pump *** -$
FP-51-0005 Tank to Pump - 3" Valve -$
FP-53-0000 3" Akron #8800 Series S.S. Ball Tank to Pump - Push/Pull 1,255$
FP-65-0000 *** Header - Tank Fill *** -$
FP-65-0450 2" Tank Fill Line from Pump -$
FP-65-0600 2" Akron #8800 Series S.S. Ball Tank Fill Push Pull 976$
FS-05-0000 *** Header - Driver's Side #1 Main Discharge *** -$
FS-05-0005 DS Main Discharge #1 -$
FS-05-0300 2 1/2" Akron #8825 - SS Ball DS #1- Push Pull 1,238$
FS-05-0553 DS Discharge #1 - 2 1/2" Straight NST & 30 DEG NST Elbows 370$
FS-05-0600 2 1/2" NST Pressure Vented Cap - DS Discharge #1 88$
FS-07-0003 Delete DS Main Pump Discharge #2 -$
FS-13-0000 *** Header - Officer's Side #1 Main Discharge *** -$
FS-13-0010 OS Main Discharge #1 -$
FS-13-0300 2 1/2" Akron #8800 Series - S.S. Ball OS #1 - Push Pull 1,254$
FS-13-0553 OS Discharge #1 - 2 1/2" Straight NST & 30 DEG NST Elbow 370$
Singe Axle Tanker Pricing Sheet Page 3 of 8
OCONEE COUNTY 2K TANKER
Single Axle Tanker Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05.
PART NO DESCRIPTION LIST PRICE
FS-13-0600 2 1/2" NST Pressure Vented Cap - OS Discharge #1 88$
FS-15-0000 *** Header - Officer's Side #2 Main Discharge *** -$
FS-15-0010 OS Main Discharge #2 -$
FS-15-0300 2 1/2" Akron #8800 Series - S.S. Ball OS #2- Push Pull 1,254$
FS-15-0553 OS Discharge #2 - 2 1/2" Straight NST & 30 DEG NST Elbow 370$
FS-15-0600 2 1/2" NST Pressure Vented Cap - OS Discharge #2 88$
FS-42-5050 *** Header - Front Discharge #1 *** -$
FS-43-0060 Front Bumper Discharge #1 - 2-1/2" 576$
FS-43-0435 2 1/2" NST Straight Adapter Thru OS of Front of Bumper Discharge #1 144$
FS-43-0560 Front Discharge #1 Plumbing 2 1/2" Stainless Steel Piping 1,641$
FS-43-0660 2 1/2" Akron #8800 Series S.S. Ball Valve Front Discharge #1 - Push 1,302$
FS-43-0810 2-1/2" NST Front Discharge #1 Pressure Vented Cap 88$
FS-50-0100 *** Header - Crosslay Discharge #1 *** -$
FS-50-0110 Crosslay #1 - 1-1/2" -$
FS-50-0400 Crosslay #1 - 200' of 1 3/4" 768$
FS-50-0430 Crosslay #1 - Double Stack Hose Design 192$
FS-50-0500 1 1/2" NST Chicksan Swivel - Crosslay #1 Discharge 262$
FS-50-0600 Crosslay #1 Plumbing - 2" Stainless Steel Piping 860$
FS-50-0700 2" Akron #8800 Series - S.S. Ball Valve Crosslay #1 - Push Pull 1,103$
FS-53-0000 *** Header - Crosslay Discharge #2 *** -$
FS-53-0010 Crosslay #2 - 1-1/2" -$
FS-53-0400 Crosslay #2 - 200' of 1 3/4" 768$
FS-53-0430 Crosslay #2 - Double Stack Hose Design 192$
FS-53-0500 1-1/2" NST Chicksan Swivel - Crosslay #2 262$
FS-53-0600 Crosslay #2 Plumbing - 2" Stainless Steel Piping 860$
FS-53-0700 2" Akron #8800 Series - S.S. Ball Valve Crosslay #2 - Push Pull 1,103$
FS-65-0005 *** Header - Crosslay/ Speedlay Options *** -$
FS-65-0103 Deadlay Hose Storage Above Pump, 200' of 3" Hose 768$
FS-65-0315 Vinyl Crosslays Cover 1,150$
FS-65-0350 Crosslays Cover - Red -$
FV-00-0010 *** Header - Foam Systems*** -$
GA-00-0000 *** Header - Pump Panel Accessories *** -$
GA-00-0015 Side Mount Pump Panel 8,640$
GA-00-0840 Side Mount Panels - All Pro Linings - Black 1,064$
GA-00-1090 Discharge Gauge Trim Bezels 40$
GA-00-2000 Identification Plates 43$
GA-01-1225 Pump Operators Panel Light Shield 317$
GA-01-1320 TecNiq #E18 LED Lights - Light Shield 439$
GA-02-0315 OS Pump Panel Light Shield 317$
GA-02-0380 TecNiq #E18 LED Strip Lights - Light Shield 439$
GA-02-0381 Microphone Box w/ Integral Speaker Grille 539$
GG-00-0020 *** Pump Operators Panel - Pumper *** -$
GG-01-0000 Class One Twister Throttle Control 998$
GG-01-0025 Air Horn Control Button on Pump Panel 379$
GG-01-0155 Class One "SPG" Pressure Governor Control @ Panel - Portrait Layout 192$
GG-01-0180 Pump Pressure & Vacuum Test Ports @ Panel 209$
GG-01-0205 Master Pressure & Compound Gauges -$
GG-01-8930 Engine Cooler Vavle 378$
GG-05-0023 6" Class One Master Pressure and Compound Gauges 597$
GG-05-0140 Pressure & Compound Gauge Ranges - Single Stage -$
GG-06-0000 Pressure Gauges -$
GG-06-0050 Class One Liquid Filled - 2 1/2" Press Gauge **Update QTY!!** 1,140$
GG-10-0010 ***Water Tank Level Gauge*** -$
GG-10-0230 Class One "ITL" 40 Light Tank Level Gauge 768$
GG-10-0260 Class One "ITL-40" Multi-Color LED's 704$
GG-10-0715 Class One Water Level - 1/4" NPT Press Transducer @ Bottom of Tank 321$
GG-10-0760 Monster Light Option -$
GG-10-0910 Monster Water Level Gauge, Rear of Body - Whelen PSTANK2 1,131$
GG-40-0000 *** Poly-Tank - Pumpers and Dryside Tankers - Non Painted Tank *** -$
GG-40-0100 Tank 2000 Poly-Tank 23,655$
GG-40-0500 Water Tank Construction Poly -$
Singe Axle Tanker Pricing Sheet Page 4 of 8
OCONEE COUNTY 2K TANKER
Single Axle Tanker Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05.
PART NO DESCRIPTION LIST PRICE
GG-40-0510 Water Tank Lid Poly -$
GG-40-0515 Standard Fill With Diverter - All Tanks 138$
GG-40-0518 Mounting Block Assembly and Tank Mounting Kit 1,145$
GG-40-0525 Water Tank Fill Tower Poly (Tank Capacity 1500-2000) 12" x 24" -$
GG-40-0550 Anti-Surge Tower - All Tanks 293$
GG-40-0563 Water Tank 6" Overflow & Vent Pipe 553$
GG-40-0600 Water Tank Sump -$
GG-40-0620 Water Tank 3" Sump Drain -$
GG-40-0750 Water Tank Outlets - Pumper -$
GG-40-0775 Water Tank Mounting All "T" Tanks -$
GG-58-0103 Water Tank Sump for Rear Dump Connection 336$
GG-58-0110 Water Tank Rear Dump - T Tanks -$
GG-58-0250 Water Tank Behind Axle Dump -$
GG-60-0005 Tank Modification for Rear Square Dump 632$
GG-60-0035 10" Square Newton Dump, Electronically Operated - Rear - Tank 5,200$
GG-60-0400 Rear 18" Square Newton Electric Chute, No Cover 4,518$
GG-60-0510 Rear Dump Switching - Driver & Officer Side Rear Body Cast Housing 853$
GG-60-0520 Rear Dump Switching - In Cab Non Multiplexed 469$
GG-60-0750 Rear Chute Switching - Driver & Officer Side Rear Body Cast Products Housing 853$
GG-60-0761 Rear Chute Switching - In Cab Non Multiplexed 469$
GG-60-0810 Three (3) Dump -$
GG-60-0830 Dump Master Power Switch in Cab 192$
GG-65-0003 Water Tank Sump for Driver Side Dump Connection 336$
GG-65-0005 Tank Modification for Driver Side Square Dump 398$
GG-65-0015 10" Square Newton Dump, Electrically Operated -Driver Side 5,200$
GG-65-0440 18" Square Newton Electric Chute, SS Cover - Driver 5,166$
GG-65-0505 Driver Dump Switching - in Cab Non Multiplexed 469$
GG-65-0585 Driver Chute Switching - In Cab Non Multiplexed 469$
GG-65-0800 Driver Dump Switching - Driver Side Rear Body Cast Products Housing 449$
GG-65-0810 Driver Chute Switching - Driver Side Rear Body Cast Products Housing 449$
GG-68-0003 Water Tank Sump for Officer Side Dump Connection 336$
GG-68-0005 Tank Modification for Officer Side Square Dump 398$
GG-68-0015 10" Square Newton Dump, Electrically Operated -Officer Side 5,200$
GG-68-0335 18" Square Newton Electric Chute, SS Cover - Officer 5,166$
GG-68-0505 Officer Dump Switching - in Cab Non Multiplexed 469$
GG-68-0585 Officer Chute Switching - In Cab Non Multiplexed 469$
GG-68-0800 Officer Dump Switching - Officer Side Rear Body Cast Products Housing 449$
GG-68-0810 Officer Chute Switching - Officer Side Rear Body Cast Products Housing 449$
GG-70-0010 Tank Modification for Dual Direct Tank Fill 1,252$
GG-70-0050 Driver & Officer's Side Rear Direct Tank Fill -$
GG-70-0115 Direct Tank Fill DS Rear 3" Akron 2-1/2" NST Fitting 2,025$
GG-70-0165 Direct Tank Fill OS Rear 3" Akron 2-1/2" NST Fitting 2,025$
HA-02-0010 Apparatus Body General Description (Tanker) -$
HA-03-0373 3/16" Aluminum Body 66,354$
HA-08-0000 Subframe for Aluminum Bodies -$
HB-35-0560 SA 165 - Tanker - Rollup Doors - BAD (2000 MAX) -$
HB-36-4200 SA Tanker FB- 165- R - DS Low Side - BAD 1,667$
HB-36-4300 SA Tanker FB- 165 - R - OS Low Side - BAD 1,667$
JA-00-0015 *** Header - Dryside Tanker Body Options *** -$
JA-01-0040 Rollup Doors on All Compartments, Any Compatible Body -$
JA-01-0135 ROM Rollup Doors, Painted Finish - QTY 930$
JA-01-0200 5-Wire MDAS (Door Ajar Switch) - ROM 273$
JA-01-0300 Painted Top Gutter And Side Frames -$
JA-01-0700 Sweep Out Compartments -$
JA-10-0110 Compartment Tops - Tankers 2,695$
JA-10-0150 Drip Molding 1,462$
JA-10-0200 Coated Fasteners -$
JA-10-0205 Compartment Louvers 7$
JA-10-0220 Access Panels -$
JA-10-0305 Tread Plate Overlay, Front of Side Compt. (Wrap Around) 1,735$
JA-15-0010 Rear Body Panel Description 1,020$
Singe Axle Tanker Pricing Sheet Page 5 of 8
OCONEE COUNTY 2K TANKER
Single Axle Tanker Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05.
PART NO DESCRIPTION LIST PRICE
JA-15-0030 Delete Rear Light Stanchions, Body Mount Warning Lights -$
JA-15-0105 Body Rub Rails Tread Plate 991$
JA-15-0600 Running Board Steps - Delete on Side Kick Pump 1,462$
JA-29-0080 Rear Step - 8" D x 100" W - Tapered Ends 1,569$
JA-31-0010 Delete Intermediate Rear Step -$
JA-35-0520 Rear Step Compartments - Tanker 1,470$
JA-35-1900 Hose Box Storage on Rear Tailboard - 50' of 3" DJ Hose - Chevron Finish 908$
JB-00-0000 *** Header - Handrail Description & Options *** -$
JB-01-0000 Grab Rails, Knurled Aluminum Extrusion -$
JB-01-0050 Handrail Finish - Clear -$
JB-01-0495 Grab Rail Locations -$
JB-01-0505 Two (2) Vertical Rails on Rear 666$
JB-01-0510 One (1) Handrail Below Hose Bed Level 462$
JB-01-0520 Two (2) 18" Horizontal Handrails Rear Top of Body 493$
JB-01-0530 Handrails Front of Body Each Side 493$
JB-03-0403 Innovative Controls Lighted Folding Step(s), Body Front DS 818$
JB-03-0453 Innovative Controls Lighted Folding Step(s), Body Front OS 818$
JB-03-0505 Innovative Controls Lighted Folding Step(s), Body Rear DS 1,636$
JB-03-0605 Innovative Controls Lighted Folding Step(s), Body Rear OS 1,636$
JB-05-0000 Safety Signs (NFPA Required) -$
JB-05-0010 Aluminum Wheel Well Liners - SA 2,327$
JB-05-0018 Polished Stainless Steel Fenderettes, Single Axle Body 575$
JC-00-0005 *** Header - Fender Options *** -$
JC-00-0500 Driver Front Fender - SCBA Air Pack Storage 1,795$
JC-00-0505 Nylon Strap for SCBA Cylinder(s) 155$
JC-00-0530 Driver Rear Fender - SCBA Air Pack Storage 1,795$
JC-00-0535 Nylon Strap for SCBA Cylinder(s) 155$
JC-00-0540 Officer Front Fender - SCBA Air Pack Storage 1,795$
JC-00-0545 Nylon Strap for SCBA Cylinder(s) 155$
JC-00-0550 Officer Rear Fender - SCBA Air Pack Storage 1,795$
JC-00-0555 Nylon Strap for SCBA Cylinder(s) 155$
JC-00-0900 Fender Storage Compartments - Painted Doors - Update QTY of Doors!! 3,816$
JC-00-0950 Fender Storage Compartment Interior - DA Sanded 1,038$
JC-00-1010 Rear Mud Flaps 155$
JC-00-1020 Painted Rear Tow Eyes, Through Rear Sheet 1,019$
JC-01-0005 Hose Bed, Tankers 768$
JC-01-0410 Fiberglass Hose Bed Flooring, Tankers 2,625$
JC-01-0500 One (1) - 3/16" Adjustable Hose Bed Partition 942$
JD-00-0010 Hose Bed Cover - Vinyl With Velcro - Update Shop Note with Color 1,984$
KD-00-0000 *** Header - Port-A-Tank Storage *** -$
KD-00-0006 Vertical Port-A-Tank Storage Beside Water Tank - Driver Side 1,536$
KD-00-0113 Rollers for Tank Storage 1,013$
KD-00-0183 Port-A-Tank Storage Access Door - Finished W/ Smooth Aluminum with Chevron 1,081$
KD-06-0001 *** Ladder Storage Options *** -$
KD-06-0007 Cast Aluminum Ladder Mounting Brackets - Officer Side 533$
KH-00-0025 Duo-Safety Ladder Compliment -$
KH-01-0075 Duo-Safety 900-A, 24', Aluminum, 2 Section Extension Ladder 1,083$
KH-01-0130 Duo-Safety 775-A, 14', Aluminum, Roof Ladder w/ Folding Hooks 501$
KH-01-0710 Duo-Safety 585-A, 10', Folding, Aluminum, Attic Ladder 366$
KL-00-0000 *** Header - Pike Poles *** -$
KL-01-0005 Pike Poles Tube (s) - Compartment Caps - **Select Location** -$
KL-01-1005 Location Pike Poles Tube (s) - OS Compartment Cap - **Update QTY!!** 785$
KL-05-0000 *** Header - Suction Hose Storage**** -$
KL-05-0450 Suction Hose Storage - Side of Body Trays - 1-Driver & 1-Officer 1,209$
KL-05-1440 Two (2) 10' Sections of 6" Kochek Lightweight Suction Hose NHLHF x NHRLM 1,947$
KL-05-1604 Safety Note for PVC Suction Hose -$
KL-05-1900 Additional Items Shipped with Vehicle, All Non Aerials -$
1 TRUCK TOTALS: 576,538$
Singe Axle Tanker Pricing Sheet Page 6 of 8
OCONEE COUNTY 2K TANKER
Single Axle Tanker Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05.
PART NO DESCRIPTION LIST PRICE
== Compartment Accessories Tanker - 0.000 == -$
KA-00-0000 *** Header - Compartment Accessories*** -$
KA-05-0415 Adjustable Shelf Description -$
KA-05-0503 Adjustable Shelf Located in L1 1,044$
KA-05-0505 Adjustable Shelf Located in R1 1,044$
2 COMP/ACC TOTALS: 2,088$
== Misc and Loose Equip - 0.000 == -$
KL-99-0010 *** Loose Equipment*** -$
KM-00-3015 Two (2) ZICO #SAC-44 Folding Wheel Chocks - (2) MTD Driver Side 1,605$
KM-00-4120 Aluminum Fol-Da-Tank - 2100 - 22OZ. HPR (9" x 30" x 135" Stored) FDTA-2100 2,437$
KM-00-4200 Fol-Da-Tank Liner Color - Red HPR -$
5 LEQUIP TOTALS: 4,042$
== T Tanker Paint and Lettering - 0.000 == -$
MA-00-0000 ******* Header - Paint Section - Remove in Upainted Bodies ********** -$
MA-00-0005 General Paint Description - All Units -$
MA-00-0035 General Primer & Prep Description - "T" Tanker 7,362$
MA-00-0125 General Finish Paint Description - "T" Tanker -$
MA-00-0230 Body Buffing & Finish - "T" Tanker 3,226$
MA-01-0030 *********** Header - "T" Tanker Body Paint ************ -$
MA-01-0125 Inside/Underside Body Painted Black - "T" Tanker 2,091$
MA-01-1325 Compartment Interior W/ Zolatone - "T" Tanker 5,575$
MA-02-0035 Single Color Body Paint Scheme - "T" Tanker 1,701$
MA-04-0000 *********** Header - 2 Door Chassis Paint SA ************ -$
MA-04-0313 2 Door Two Tone - Match Customer Sample - Painted by Chassis Manufacturer 2,945$
MA-04-1010 Commercial Cab Paint Finish -$
MA-04-1200 Commercial Chassis Wheel and Hub Paint - As Provided -$
MA-04-1550 Pint of Touch Up Paint -$
MA-04-1620 Finalization & Detailing - "T" Tanker 1,152$
MA-04-1700 Anti-Corrosion Treatment 406$
MB-00-0005 ***************** Header - Lettering & Striping ***************** -$
MB-00-0100 Computer Generated Lettering -$
MB-00-0200 Front Cab Door Lettering -$
MB-00-0215 4" Scotchlite Letters - Update QTY!! 198$
MB-00-0290 Shade for Letters 161$
MB-00-0900 Lettering on Hose Bed Walls -$
MB-00-0910 10" Scotch-Lite Letters - Update QTY!! 527$
MB-00-0990 Shade for Letters 403$
MB-00-3700 Custom Fire Department Logo 1,662$
MB-00-3705 Scotch-Lite W/ Two Colors - Custom Logo 155$
MB-00-3720 Location - Custom Logo -$
MC-00-0100 NFPA Required Scotch-Lite Striping -$
MC-00-0120 4" Scotch-Lite Stripe on Cab and Body 2,038$
MC-00-1000 White Scotch-Lite -$
MC-00-2005 Rear Chevron Striping -$
MC-00-2015 Entire Rear -$
MC-00-2060 6" Full Rear Scotch-Lite Diamond Grade Chevron Striping 2,117$
MC-00-2110 Red & Fluorescent Yellow Green Diamond Grade Scotch-Lite -$
Singe Axle Tanker Pricing Sheet Page 7 of 8
OCONEE COUNTY 2K TANKER
Single Axle Tanker Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05.
PART NO DESCRIPTION LIST PRICE
6 PAINT TOTALS: 31,721$
== Tanker Warranty Package W/ Pump - 0.000 == -$
W0-00-0050 *** Proposed Warranty - Tanker W/ Pump ****** -$
WA-00-0005 Proposed - FES Warranty - Starting on In Service Date -$
WA-00-0260 Proposed - 1 Year New Material & Workmanship Warranty - Pumper & Tanker 9,300$
WA-00-0300 Proposed - 10 Year Body Structural Warranty -$
WA-00-0310 Proposed - 10 Year Body Corrosion Warranty - Commercial Chassis -$
WA-00-0330 Proposed - 7 Year Paint Finish Warranty -$
WA-00-0400 Proposed - 5 Year Lettering Warranty -$
WA-00-0410 Proposed - 1 Year Brightwork Warranty -$
WA-00-0500 Proposed - 10 Year Stainless Steel Warranty -$
WA-00-0520 Proposed - Lifetime Poly Tank Warranty - All Tanks -$
WA-00-0600 Proposed - Hale Fire Pump Limited Standard Warranty -$
WA-00-1110 Proposed - Akron Heavy Duty Valves 10 Year Warranty -$
8 WARRANTY TOTALS: 9,300$
1 TRUCK TOTALS: 576,538$
2 COMP/ACC TOTALS: 2,088$
5 LEQUIP TOTALS: 4,042$
6 PAINT TOTALS: 31,721$
8 WARRANTY TOTALS: 9,300$
QUOTE TOTALS: 623,689$
Percent Off List 16.90%
List Price Per Truck Only 623,689$
Contract Price Per Truck Only (after contract discount) 518,283$
Grand Total for Six (6) Trucks 3,109,695$
Singe Axle Tanker Pricing Sheet Page 8 of 8
OCONEE COUNTY 2K TANKER
Loose Equipment Pricing Sheet
North Carolina Sheriffs Association Cooperative Purchasing Contract (NCSA) Contract Number 25-05-0521 / FES24-05
PART NO DESCRIPTION LIST
PRICE
EST28927 *** Loose Equipment*** -$
HFX50X100Y50S Ten (10) All American - HFX LDH Hose, 5" x 100', 5" Storz, Yellow 19,150$
DJ17X50R15N Eight (8) FireQuip - DJ800 Double Jacket Attack Hose, 1.75" x 50', Red 2,104$
DJ30X50B25N Four (4) FireQuip - DJ800Double Jacket Attack Hose, 3" x 50', 2.5" Couplings, Blue 2,420$
DJ30X50Y25N Two (2) FireQuip - DJ800 Double Jacket Attack Hose, 3" x 30', 2.5: Couplings, Yellow 1,210$
ME2VPGI-262 Two (2) TFT - Initial Attack - METRO 2 W/GRIP 1.5"NHF, 185 GPM @ 50 PSI 3,402$
A-G1FS442MD2C0LAR
Two (2) MSA - G1 SCBA
SYSTEM PRESSURE 4 4500 PSIG
CYLINDER CONNECTION 4 CGA Quick Connect Remote Con
HARNESS 2 Standard wth Chest Strap
CRADLE TYPE M Metal Band
LUMBAR TYPE D Adj. Swivel Solid Buckle
REGULATOR TYPE 2 Solid Cover Left Shd.
REGULATOR HOSE TYPE C Continuous
EMERGENCY BREATHING SUPPORT 0 None
SPEAKER MODULE L Left Chest
PASS A PASS Right Shoulder
BATTERY TYPE R Rechargeable 19,866$
10175708 Four (4) MSA - CYL VLV QC G1 RC 4500 PSIG, LP , 45 MINUTE CYLINDER 7,560$
10161816 Two (2) MSA - Fcpc, G1, FS, MD, MD NC, 5PT C-HARN,C-N 1,222$
7982001 Akron - Revolution Piston Intake Valve, w/ 30 Degree Swivel Elbow Inlet, w/ 5" Storz & 6" LH inlet 3,230$
35R2525-H52 Two (2) Kochek - 2.5 NH X 2.5 NH DBL SW RL F -FG-,ADAPTERS 295$
36R2525-H52 Two (2) Kochek - 2.5 NH X 2.5 NH DBL RL M -FG-,ADAPTERS 146$
K36R2525-P09 Two (2) Kochek - 2.5 CAMLOCK M X 2.5 NH RIG M,CAMLOCK ADAPTER 205$
K37R2525-P09 Two (2) Kochek - 2.5 CAMLOCK M X 2.5 NH RIG RL F ,CAMLOCK ADAPTER 200$
44451 Two (2) Streamlight - Fire Vulcan: Vehicle Mount System, 12V DC, w/ Quick Release Shoulder Strap & Direct Wire Rack, Orange 727$
FA-6 Fire Hooks - Flathead Axe, Fiberglass Handle 75$
PB-30 Fire Hooks - Pro Bar: 30", Aircraft Steel, Nickel Plated 296$
K5003-B PAC Tool - MOUNTING KIT: *IRONSLOK KIT Black 283$
2507101 Elkhart - Wyes: 2.5 FNH, (2)1.5 MNH, 2-way, Elk-O-Lite 554$
LL602-1-P07-P18 Kochek - 6 NH L/L STRAINER W/8" TUBING 1.5 NH JET & EXTERNA, STRAINERS 1,457$
09K25225M-H52 Kochek - GATE VALVE 2.5 NH SW RL F X 2.5 NH M, VALVES 728$
S54L545-H52 Kochek - 5 STZ W/LCK X 4.5 NH SW LH F -FG-, STORZ ADAPTER 413$
K45-3-P18-P09 Three (3) Kochek - ONE #K05 AND TWO #K01 W/HOLDER SILVADILLO,WRENCH 788$
KS34-P18-P09 Kochek - SET OF(4) STORZ X SPANNER WRENCH W/HLDR,WRENCH 239$
QL48Z25C Three (3) South Park Quic-Loc 2.5" Mounting Plate 169$
Service labor Labor to mount equipment 800$
Shop Supplies Supplies to mount equipment 50$
LOOSE EQUIPMENT TOTALS 67,587$
Percent Off List 38.39%
List Price Loose Equipment Per Truck 67,587$
Contract Price Loose Equipment Per Truck Only (after contract discount) 41,640$
Grand Total Loose Equipment for 6 Trucks 249,840$
Loose Equipment Pricing Sheet Page 1 of 1
Oconee County
2000 Gallon Tanker
June 12, 2024
North Carolina Sheriff's Association
Contract Number Contract Number
25-05-0521 / FES24-05
Oconee County
2k Tanker 06/12/2024 Page 1
PROPOSAL
Safe Industries is pleased to offer the proposed vehicle to meet the intent of the fire department
specifications. Fire Equipment Sales and Services is a manufacturer in commercial fire fighting vehicles.
Questions or concerns pertaining to this proposal can be answered by contacting the following FES
representative:
Safe Industries
5031 Highway 153
Easley, SC 29642
Office: (864) 845-7175
Fax: (864) 845-7176
Cameron Marler
Cell (864) 245-7937
cmarler@safeindustries.com
After Hours Emergency Service Hotline: 1-864-845-7175 Option #3
GENERAL INFORMATION
The proposed apparatus will be constructed to withstand the severe and continuous use encountered
during emergency fire fighting services. The apparatus will be of the latest type, carefully designed and
constructed with due consideration to the nature and distribution of the load to be sustained.
This proposal details the general design criteria of cab and chassis components, aerial device (if
applicable), fire pump and related components (if applicable), water tank (if applicable), fire body,
electrical components, painting, and equipment.
All items of these proposal specifications will conform to the fullest extent possible with the National Fire
Protection Association Pamphlet No. 1900, latest edition, except as noted in the Statement -of-Exceptions.
FES will furnish satisfactory evidence of our ability to construct, supply service parts and technical
assistance for the apparatus specified.
Oconee County
2k Tanker 06/12/2024 Page 2
FIRE APPARATUS COMPLETION DOCUMENTATION
Fire Equipment Sales and Services will provide, at the time of apparatus delivery, at least one (1) copy of
the following documents.
The apparatus manufacturer's record of apparatus construction (build) details, including the information
listed below:
• Apparatus Owner's name and address
• Apparatus manufacturer, model and serial number
• Apparatus Chassis make, model and serial number
• Front tire size, and total rated capacity (in pounds)
• Rear tire size, and total rated capacity (in pounds)
• Apparatus Chassis weight distribution in pounds, with water and equipment mounted, front and
rear
• Apparatus Engine make, model, serial number, rated horse power, rated speed and governed
speed.
• Type of fuel(s) used by apparatus and fuel tank(s) capacity
• Apparatus electrical system - Voltage and Alternator output (in amps)
• Battery make, model and total capacity (in cold crank amps)
• Transmission make, model and serial number: If equipped, chassis transmission PTO(s) make,
model and gear ratio
• Pump make, model, rated capacity in gallons per minute (GPM) and serial number
• Apparatus water tank certified capacity in gallons
• Paint manufacturer and paint number(s)
The apparatus manufacturer shall include certification of "slip resistance" for all stepping, standing and
walking surfaces.
If the apparatus has a fire pump, the following additional documents shall be provided:
• The pump manufacturer's certification of suction capability
• Copy of the apparatus manufacturer's approval for stationary pumping applications
• Engine manufacturer's certified brake horsepower curve for the engine provided, showing the
maximum governed speed.
• Pump manufacturer's certification of hydrostatic test (if it applies)
• The independent third party certification of inspection and test for the apparatus fire pump
If the apparatus has a "fixed line" voltage power source, there shall be documentation of the fixed power
source test certification.
If the apparatus features an air system, there shall be test results of the air quality, SCBA fill station and
the installation of the air system.
The apparatus manufacturer shall provide documentation from a certified weight scale. This
documentation shall show actual loading on the front axle, rear axle(s) and overall vehicle weight. This
weight shall include the weight of the "full" apparatus water tank. This documentation shall be provided
with the completed apparatus build to determine compliance with NFPA 1901 latest addition.
Electrical performance testing documentation and a written load analysis report shall be provided with the
completed apparatus.
If the apparatus features a water tank, the water tank capacity certification shall be supplied by the tank
manufacturer.
Oconee County
2k Tanker 06/12/2024 Page 3
APPARATUS FMVSS CERTIFICATION
The proposed chassis will be certified by FES as conforming to all applicable Federal Motor Vehicle
Safety Standards (FMVSS) in effect at the da