Development Review Committee Meeting — Agenda Packet
Town of Bluffton · Beaufort County · Development Review Committee · meeting of Sep 24, 2025 · Agenda packets
Open the original document More from Town of Bluffton
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Development Review Committee Meeting
Wednesday, September 24, 2025 at 1:00 PM
Theodore D. Washington Municipal Building, Henry “Emmett” McCracken Jr. Council Chambers,
20 Bridge Street, Bluffton, SC
AGENDA
All Applications can be viewed on the Town of Bluffton’s Permit Finder page
https://www.townofbluffton.us/permit/
I. CALL TO ORDER
II. ROLL CALL
III. PUBLIC COMMENT
IV. OLD BUSINESS
V. NEW BUSINESS
1. Alston Park - Phase 3 (Development Plan): A request by John Cardamone of Village Park
Communities, LLC, for approval of a preliminary development plan application. The project
consists of 76 single family detached residential lots, open space, right-of-way, and associated
infrastructure. The property is zoned New Riverside PUD and consists of approximately 63.4
acres identified by tax map numbers R610 035 000 0019 0000 and R610 035 000 0864 0000
and commonly referred to as New Riverside Parcel 5A South located east of New Riverside
Road. (DP-08-25-019903) (Staff – Dan Frazier)
2. Bridge Street Streetscape Phase 2-3 (Public Project): A request by Constance Clarkson on
behalf of the Town of Bluffton for the approval of a Public Project application. The project
consists of roadway, sidewalk, parking and drainage improvements in the Bridge Street right-
of-way between Calhoun Street and Thomas Heyward Street in Old Town Bluffton Historic
District. (DP-11-24-019435) (Staff - Dan Frazier)
3. Encompass Health Bluffton Bed Addition (Development Plan Amendment): A request by
Thomas Boyle of Encompass Health for approval of a development plan amendment
application. The project consists of the addition to the existing rehabilitation hospital 12-bed
expansion/dialysis suite and therapy expansion. The property is zoned Village at Verdier PUD
and consists of approximately 5.92 acres identified by tax map number R610 021 000 0649
0000 located at 107 Seagrass Station Road. (DP-12-16-010401) (Staff - Dan Frazier)
VI. DISCUSSION
Page 1
Town of Bluffton, SC Development Review Committee Meeting Agenda September 24, 2025
VII. ADJOURNMENT
NEXT MEETING DATE: Wednesday, October 1, 2025
“FOIA Compliance – Public notification of this meeting has been published and posted in compliance
with the Freedom of Information Act and the Town of Bluffton policies.”
In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the
Town of Bluffton will not discriminate against qualified individuals with disabilities on the basis of
disability in its services, programs, or activities. The Town of Bluffton Council Chambers are ADA
compatible. Auditory accommodations are available. Any person requiring further accommodation
should contact the Town of Bluffton ADA Coordinator at 843.706.4500 or
adacoordinator@townofbluffton.com as soon as possible but no later than 48 hours before the
scheduled event.
Executive Session – The public body may vote to go into executive session for any item identified for
action on the agenda.
*Please note that each member of the public may speak at one public comment session and a form must
be filled out and given to the Town Clerk. To submit a public comment online, please click here:
https://www.townofbluffton.sc.gov/FormCenter/Town-15/Public-Comment-60
Public comment is limited to 3 minutes per speaker.
Page 2
PLAN REVIEW COMMENTS FOR DP-08-25-019903
Town of Bluffton
Department of Growth Management
20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910
Telephone 843-706-4522
ALSTON PARK
Plan Type: Apply Date:
Plan Status: Plan Address:
Development Plan
Active
08/20/2025
Plan PIN #:Case Manager: R610 035 000 0019 0000Dan Frazier
Plan Description: A request by John Cardamone of Village Park Communities, LLC, for approval of a preliminary development
plan application. The project consists of 76 single family detached residential lots, open space, right-of-way,
and associated infrastructure. The property is zoned New Riverside PUD and consists of approximately 63.4
acres identified by tax map numbers R610 035 000 0019 0000 and R610 035 000 0864 0000 and commonly
referred to as New Riverside Parcel 5A South located east of New Riverside Road.
STATUS: This item will be heard at the September 24, 2025 Development Review Committee meeting.
Technical Review
Submission #: 1 Received: 08/20/2025 Completed: 09/19/2025
Reviewing Dept. Complete Date StatusReviewer
Revisions Required09/19/2025Fire Department Review Dan Wiltse
Comments:
1. Fire Hydrant Locations are not identified on the Water Plan Sheets. Provide proposed fire hydrant locations where applicable
on plan sheets.
Revisions Required09/19/2025Planning Review - Principal Dan Frazier
Comments:
1. What is the purpose of the 8" water line between Lots 25 and 26 on Plan Sheet C4-15?
2. Show future connection and applicable crosswalks for proposed internal sidewalk to proposed Holly Hill Lane pedestrian path.
Show C6-20 Pavement Markings on Site Plan Sheets.
Revisions Required09/17/2025Watershed Management Review
DRC
Samantha Crotty
Comments:
1. Provide a wetland permit extension letter from the USACOE.
2. The demo plan sheets show clearing and grubbing of the entire wetland buffer. Revise demo sheets to show no development
or disturbance in the wetland buffer zones.
3. Provide proposed contours inside the bioretention cells.
4. The narrative states the project's disturbed area is 63.4 acres while the compliance calculator only accounts for 50.4 acres.
Revise compliance calculator to include the whole LOD.
5. Provide the Rainwater Harvesting Calculator (SWDM Appendix K).
6. Provide an exhibit that shows the contributing drainage area to each BMP.
7. Post-development land cover totals should match (or be very similar to) the contributing drainage area totals on the BMP sheet
of the compliance calculator.
At time of stormwater permit submittal:
1. Revise stormwater ponds to meet SoLoCo design standards.
2. Provide geotechnical testing results from the location of each proposed BMP that supports the use of bioretention - no
underdrain in type D soils.
3. Show location and type of outlet structure for each bioretention area.
Approved with Conditions09/19/2025Planning Commission Review Angie Castrillon
09/19/2025 Page 1 of 2Page 3
Section V. Item #1.
Comments:
1. Planning Commission members may provide comment at time of DRC.
Approved with Conditions09/19/2025Planning Review - Address Ryan Coleman
Comments:
At time of subdivision submittal, coordinate addressing with Ryan Coleman, Town of Bluffton GIS Manager (843-706-4570 /
rcoleman@townofbluffton.com).
Approved09/19/2025Beaufort Jasper Water and Sewer
Review
Matthew Michaels
Approved09/19/2025Building Safety Review Sidney Holland
Approved09/19/2025Police Department Review Bill Bonhag
Approved08/20/2025Transportation Department
Review
Mark Maxwell
Comments:
No comments
Plan Review Case Notes:
09/19/2025 Page 2 of 2Page 4
Section V. Item #1.
PLAN REVIEW COMMENTS FOR DP-11-24-019435
Town of Bluffton
Department of Growth Management
20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910
Telephone 843-706-4522
OLD TOWN
Plan Type: Apply Date:
Plan Status: Plan Address: 74 Bridge St Street
BLUFFTON, SC 29910
Public Project
Active
11/04/2024
Plan PIN #:Case Manager: R610 039 00A 159A 0000Dan Frazier
Plan Description: A request by Constance Clarkson on behalf of the Town of Bluffton for the approval of a Public Project
application. The project consists of roadway, sidewalk, parking and drainage improvements in the Bridge
Street right-of-way between Calhoun Street and Thomas Heyward Street in Old Town Bluffton.
STATUS: This item was heard at the December 18, 2024 Development Review Committee meeting.
STATUS: A resubmittal will be heard at the September 24, 2025 Development Review Committee meeting.
Approved with Conditions09/19/2025Planning Commission Review Angie Castrillon
Comments:
The following comments were provided by HPRC Member Joe DePauw for the 12/18/24 DRC meeting:
1. Study the options to provide additional cross walk markings closer to the bridge or some directional signage by the existing
crosswalks. The concern is that pedestrians will be on the South side of the street, get to the bottom of the hill by the bridge,
realize the path is narrow and then try to cross the street to the new boardwalk at a location where traffic visibility is reduced by the
curves, slopes and foliage.
2. Could flexible delineator posts be incorporated along the south side of the bridge between the pedestrian and vehicular traffic to
improve separation?
Approved with Conditions09/19/2025Planning Review - Senior Dan Frazier
Comments:
1. Pending receipt of NPDES Approval Letter.
Approved with Conditions09/19/2025Watershed Management Review
DRC
Samantha Crotty
Comments:
1. Pending receipt of NPDES Approval Letter. 2. Additional comments may be provided at time of stormwater permit review.
Approved09/19/2025Beaufort Jasper Water and Sewer
Review
Matthew Michaels
Approved09/19/2025Fire Department Review Dan Wiltse
Approved09/19/2025Planning Review - Principal Dan Frazier
Approved09/19/2025Transportation Department
Review
Mark Maxwell
09/19/2025 Page 1 of 1Page 5
Section V. Item #2.
PLAN REVIEW COMMENTS FOR DP-12-16-010401
Town of Bluffton
Department of Growth Management
20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910
Telephone 843-706-4522
HEALTH SOUTH REHABILITATION HOSPITAL
Plan Type: Apply Date:
Plan Status: Plan Address:
Development Plan
Active
12/22/2016
Plan PIN #:Case Manager: R610 021 000 0520 0000William Howard
Plan Description: The applicant is requesting approval for a preliminary development plan to construct a 46,000 plus square foot
rehabilitation hospital and associated infrastructure in the Seagrass Station Development formerly known as
Village at Verdier Plantation.
STATUS: Comments were provided on Preliminary Development Plan at DRC meeting 01/17/17. Waiting on
re-submittal.
STATUS 02/21/17: Final Development plan has been submitted, with comments due 02/24/17 and DRC Meeting
02/24/17.
STATUS 02/24/17: Comment provided at DRC meeting. Revisions required by Stormwater Management.
Awaiting re-submittal.
STATUS 04/03/17: Plans were re-submitted for review with comments due 04/10/17.
STATUS 04/18/17: Comments have been provided to the Applicant with Revisions required for Stormwater
Management. Awaiting re-submittal.
STATUS 05/15/17: APPROVED
STATUS: An amendment for the addition of 12 hospital beds/dialysis suite and therapy expansion has been
applied for and will be heard at the September 24, 2025 Development Review Committee meeting.
Technical Review Amend
Submission #: 1 Received: 09/17/2025 Completed: 09/19/2025
Reviewing Dept. Complete Date StatusReviewer
Approved with Conditions09/17/2025Watershed Management Review
DRC
Samantha Crotty
Comments:
1. Pending receipt of NPDES approval letter.
2. Additional comments may be provided at time of stormwater permit review.
Approved09/19/2025Beaufort Jasper Water and Sewer
Review
Matthew Michaels
Approved09/19/2025Building Safety Review Marcus Noe
Approved09/19/2025Fire Department Review Dan Wiltse
Approved09/19/2025Planning Commission Review Angie Castrillon
Approved09/19/2025Planning Review - Senior Anna Bashaw
Approved09/19/2025Police Department Review Bill Bonhag
Approved09/19/2025Transportation Department
Review
Mark Maxwell
09/19/2025 Page 1 of 2Page 6
Section V. Item #3.
Plan Review Case Notes:
09/19/2025 Page 2 of 2Page 7
Section V. Item #3.
Source: Town of Bluffton website. First collected Nov 19, 2026.