RecordWell Data

Design Review Board Meeting (Agenda Packet)

City of Beaufort · Beaufort County · meeting of Sep 14, 2023 · Agenda packets

Open the original document More from City of Beaufort

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

MEETING AGENDA The City of Beaufort DESIGN REVIEW BOARD Thursday, September 14, 2023, 2:00 P.M. City Hall, Council Chambers, 2nd Floor – 1911 Boundary Street, Beaufort, SC Please click the link below to join the webinar: https://us02web.zoom.us/j/83564851031?pwd=WWJ2VUcwSjVSU09EbDlxMmVkcTc0QT09 Passcode: 159940 Meeting ID: 835 6485 1031 Call in Phone#: 1+929-205-6099 STATEMENT OF MEDIA NOTIFICATION: "In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, all local media were duly notified of the time, date, place and agenda of this meeting." Note: A project will not be reviewed if the applicant or a representative is not present at the meeting. I. Call to Order II. Review of Minutes: A. Minutes of August 10, 2023 Meeting III. Applications: A. Beaufort Senior Apartments, PIN R122 029 000 0625 0000, 1556 Salem Road. Applicant: Michael Riley, Architect (23-02 DRB.5) The applicant is requesting final site plan approval for a 154-unit senior apartment building including (88) 1-bedroom units, (66) 2-bedroom units with on-site parking. IV. Discussion V. Adjournment 1 Design Review Board Meeting Minutes – August 10, 2023 CALL TO ORDER 0:30 A meeting of the Design Review Board was held in-person on Thursday, August 10, 2023 at 2:00 pm. ATTENDEES Members in attendance: Benjie Morillo (Chairman), Kim McFann (Vice-Chair), Erik Petersen, Clinton Hallman, and Bill Suter. Staff in attendance: Curt Freese (Community Development Director). REVIEW OF MINUTES 2:17 Motion: Ms. McFann made a motion to approve the April 13, 2023 minutes; seconded by Mr. Suter. The motion passed unanimously. All Historic District Review Board Meeting minutes are recorded and can be found on the City’s website at http://www.cityofbeaufort.org/AgendaCenter. Audio recordings are available upon request by contacting the City Clerk, Traci Guldner at 843-525-7024 or by email at tguldner@cityofbeaufort.org. APPLICATIONS A. Battery Creek Apartments, PIN R120 028 00A 0409/0410/0411/0412/0413/0000, 2:35 25 Old Jericho Road Applicant: Ryan Lyle, Andrews Engineering (23-01 DRB.4) The applicant is requesting site plan approval of an 83-unit four-story apartment building with a pool and pool cabana and on-site parking. Motion: Ms. McFann made a motion based on the findings on pages three and four of the staff report. We recommend final approval of the site plan which is approval of the project as a whole subject to staff recommendations on page 5 of the staff recommendations; site and landscaping number 1-5; architecture 1-3 with the following additional conditions: 1. Add low trees along the Jericho Road sidewalk consistent with utility considerations. 2. Regarding Beaufort Jasper Water & Sewer Authority infrastructure as a condition that the project cannot be built until the infrastructure is in place and planned for and put a three-year time limit on the infrastructure being in place and the ability to build. If 2 they cannot start within that three-year period, the project would need to reapply for site plan approval to the Design Review Board or the subsequent body that does site plan approvals in the future. 3. Consider moving the shed roof down over the four court or making other modifications to the four-car court to make the entryway more inviting. _____ seconded the motion. The motion passed unanimously. B. Beaufort Senior Apartments, PIN R122 029 000 0625 0000, 1556 Salem Road 55:39 Applicant: Michael Riley, Architect (23-02 HRB.5) The applicant is requesting site plan approval for a 154-unit senior apartment building including (88) 1-bedroom units, (66) 2-bedroom units with on-site parking. Motion: Ms. McFann made a motion for final approval of the project to be deferred and the applicant come back before the Design Review Board after working with staff and the architect and that they consider doing the following: 1. As to page A3.1, the east elevation, considers simplification or change of the materials regarding the east elevation. 2. On page A3.4 consider simplifying the transitions of materials as shown in the drawings. 3. Provide color of real color samples when coming back. 4. Show cross section of parapet back on page A3.1 5. Also, on page A3.1, consider extension of the roof on the first floor farther over to the left-hand side over the windows adjacent to the roof section as shown. ______ seconded the motion. The motion passed unanimously. C. ALDI - Beaufort, PIN R120 028 000 0138 0000, 361 Robert Smalls Parkway 1:24:53 Applicant: Vanessa Banks, APD Engineering & Architecture, PLLC (23-09 DRB.1) The applicant is requesting conceptual approval for a new Aldi Grocery store on an outparcel facing Robert Smalls Parkway in the Beaufort Station shopping center. Motion: ________ made a motion to table the project. ________ seconded the motion. The motion passed with a vote of 4:1. Ms. McFann asked staff for a status of the structural changes. Mr. Freese state text amendments are going back to the MPC on August 21 with some revisions and that the new Board would have seven members. ADJOURNMENT 2:47:30 Motion: Ms. McFann made a motion, seconded by Mr. Petersen, to adjourn the meeting at 4:47 pm. SALEM SENIOR HOUSING FINAL STAFF REPORT: 1556 Salem Road Site Plan/Senior Housing DATE: September 14, 2023 GENERAL INFORMATION Applicant: Mike Riley, Agent for Beaufort Senior Apartments Site Location/Address: 1556 Salem Road/R 120 004 000 1007 0000 Applicant's Request: The Applicant is requesting site plan approval for a 154-unit senior apartment building including (88) 1-bedroom units, (66) 2-bedroom units with on-site parking in the T4-N district. Current Zoning: T-4 N ZONING DISTRICT INFORMATION T-4 N Max Density N/A Min. Lot Size N/A Min. Frontage Build Out 60%- 85 % min Front Setback 0’ min/15’ max Side Setback 0-15 max Rear Setback 10’ Building Height: 4 stories SURROUNDING ZONING, LAND USE AND REQUIRED BUFFERS Adjacent Zoning Adjacent Land Uses Setbacks for Adjacent Zoning /Buffer required if rezoned North: T-4 N Vacant/Commercial N/A South: T-4 N Townhouses N/A East: T-3S Single family homes/U-haul N/A West: T-4N Car dealership/Used Car dealer N/A Background: The project has been in review for some time, and across three different Community Development Administrations. The applicant first participated in a pre-design meeting on 12/8/2020 and a revision meeting on 3/2/2022. The applicant met with the city on 4/26/2022 and then attended a pre-app meeting with the city on 11/2/2022. This application was deferred at the January 2023 DRB meeting. The applicant met with city staff at the 2/28/2023 TRC meeting and had further informal meetings in April. The current Staff has raised issues that heretofore were unaddressed through the last 2 years. The Applicant has made significant changes to the layout based on Staff comments discussed in April, May, and June. 2 Since August 8 DRB meeting The project was heard at the August 8 DRB meeting, with the DRB tabling with the request to add cutsheets for walls, consider wider bays at the entrances, gang window fenestration, provide detail for HVAC location, details for the picnic pavilion, and otherwise provide all cutsheets for all building sections. The Applicant has provided additional detail, which has been reviewed by Staff. Streets: Salem road is a two-lane road, with a drainage ditch and no sidewalks. The applicant would build a sidewalk along their portion of the road, which would link to the County’s funded Salem Road sidewalk project. Thomas and Hutton Engineers verified that the project would not generate more than 50 or more trips per hour, and thus the TIA is not required as per the Development Code. Access: The Applicant is proposing to build two entrance points at the center and North end of the property. They have moved the proposed Southern entrance due to Staff concerns about visibility and safety on the sharp curve. The Northern Entrance would be a shared access drive with the adjoining Northern property. Lots and Blocks: While the property is zoned T4-N, a typical urban lot and block street pattern does not currently exist. Moreover, due to the sharp curve, creek, and natural features to the South, an urban grid pattern cannot continue Southward. There is a car dealership on the adjoining non-Salem side of this lot. An urban grid could be built to the North of this property. In addition, the new layout creates a more urban pattern. Heights: A four-story bank building exists two lots away along HWY 170. However, the adjoining properties all are either one story commercial buildings, with two story houses across the street, and several of two- story fourplexes to the South. T4-N requires a 2-story height minimum per code. Upon Staff suggestion, the applicant has stepped back the four-story height from the street, so the wings of each building are 4 stories, and the buildings along Salem are only three stories. Future Land Use: 3 The Area is planned for Urban uses and development. Zoning: The zoning of the property T4-N does not have a density limit, but does regulate a four-story maximum height, and basic setbacks to the road. The use of multi-family senior housing is a permitted use in the T-4 N district. Amenities: A community garden is planned in the center open space as per Staff’s suggestion. There is also a small gazebo in the center of the lot. Staff Comments Section 9.8.3 Decisions/Findings of Fact: Following the public meeting, the Design Review Board may approve, deny, or approve with conditions the application for a Major Development. No Major Development shall be approved unless the following findings of fact can be made: 9.8.3 Finding of Fact Rationale Present (yes/no) Staff Analysis of Rationale 1. The plan is consistent with the adopted plans and policies of the City. Yes  The plan is consistent with density, use and setbacks of the T4-N district, and the future land use plan.  The applicant has taken Section of 9.8.3 into consideration, and has altered the height, scale and mass accordingly to respect the surrounding built form. 2. The plan complies with all applicable requirements of this Code. Yes  Staff believes the project complies with the major requirements of the code, and minor architectural revisions would be appropriate at the Final approval. 3. There exists adequate infrastructure (transportation and utilities) to support the plan as proposed. Yes  The applicant is providing curb and gutter, sidewalks and urban amenities and scale as required by the T-4 N district.  While there is not urban infrastructure around the project, it is entitled with urban district standards, and the project should make for a more urban block sympathetic to transect based 4 development in the future. 4. The proposed plan conforms to the character of the neighborhood, considering the location, type and height of buildings or structures and the type and extent of landscaping on the site Yes  The properties to the North and West are commercial in nature and should develop in an urban fashion as per their urban transect zones. The Senior homes will establish an urban form in an otherwise non-urban area as required by the Beaufort Code.  Staff acknowledges the lack of mass, scale, and type of buildings in the general vicinity. This has been relayed to the applicant who has revised their plans accordingly by limiting the fourth story, breaking up the mass, stepping the buildings back, adding curb and gutter, and more open space/landscaping. 5. The proposed plan conforms to the Building Design Standards in Article 4. Yes  Applicant has demonstrated compliance with Section 4.6.3.C.1 and many of the architectural standards of the Beaufort Code.  The applicant has made many changes There are a number of architectural details and changes Staff recommended that have been followed by the Applicant. Staff has made final recommendations for the Final approval that Staff believes will resolve any other issues regarding this finding. 6.The application will not substantially lessen the value of adjoining or abutting property and will not be detrimental to the use or development of adjacent properties or other neighborhood uses. Yes  The surrounding properties have T-4N and T-5 UC zoning classifications, and expectations of density.  Affordable senior housing is a pressing need for the Beaufort community, and this request will serve to satisfy a portion of this need. 5 FINDINGS AND RECOMMENDATIONS Staff Recommendation: Staff recommends Final approval of the application at 1556 Salem Road, in that is satisfies the findings and requirements of Section 9.8.3 the Beaufort Code found in pages 2-4 of this Staff Report with the following conditions: 1. Staff recommends the applicant consider a more neutral metal roof color as opposed to the Rustic Red given the other proposed colors on the project. Applicant may consider a bronze or dark bronze color. 2. Applicant notes on A1.8 the roof is a master-rib roof system. Staff does not support this bulky roof profile and recommends a simpler standing seam with smooth panel between the seams. 3. Staff recommends the applicant select SDL windows. 4. Detail 4 on sheet A1.7 illustrated metal tie plates on the wood timber support brackets. Staff recommends the applicant eliminate these visible tie plates and instead use concealed fasteners to fabricate these brackets. 5. Applicant to note the color of the continuous metal flashing above brick soldier course around the building. Staff recommends a neutral color such as bronze or dark bronze for this transition. 6. Applicant to confirm that the parapet cap flashing is white per the colored elevation. 7. On sheet A1.7, the projecting windowsills do not appear to be sloped to drain. Applicant to confirm. 8. The larger scale wall section 1 on sheet A1.7 has detail callouts for the windowsills referencing detail 3 on sheet A1.7. However, this is not the correct reference and larger scale projecting windowsill details are missing from application. 9. Applicant must provide a typical wall section through a porch to identify the interaction and details related to these areas around the building. 10. It appears that the color swatch representation of Latte and Kilim Beige on sheet A1.8 are incorrect compared to actual swatches from Sherwin Williams. Applicant to confirm and bring to meeting actual color samples. Staff supports the colors Latte and Kilim Beige. However, the proposed Honey Blush doesn’t seem to go well with the other material colors. Staff recommends the applicant provide an alternate color to the Honey Blush and would recommend staying within the same color range as Latte and Kilim Beige. 11. On picnic pavilion, staff recommends the applicant align the band beam with the column shafts below. 6 A1(b)-ENDA1(b)-END B1(b) A1(b) A1(b) A1(b) A1(b)A1(b)A1(b)A1(b)A1(b) A2(b) A1(b) B1(b) B1(b) B1(b)-PATIOB2(b)-PATIO A2(b) - PATIO 124122120118116114109 123121119117115113 108 106 104 107 103 105 101 102 M.E.M.M. M. M. COMMUNITYAREAS LEASING OFFICE& COMMUNITYAREAS E. E. B2(b)-PATIOB2(b)-PATIOB2(b)-PATIO 90'-612" 48'-3" 48'-2"234'-512" 2018-0786-6-2023VJT BUILDING 100 - FIRST FLOOR PLAN SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - FIRST FLOOR PLAN3/32" = 1'-0" A3.13 A1(b) A1(b) A1(b) A1(b)A1(b)A1(b)A1(b)A1(b) A2(b) B1(b) B1(b) B1(b)B2(b) A2(b) A3(b) A3(b) B3(b) 224222220218216214209 223221219217215213 208 206 204 207 210 212 211 M.E.M.M. M. A1(b)-END B1(b) A1(b)203 205 201 202 E. M. B2(b)B2(b)B2(b) A1(b)-END 2018-0786-6-2023VJT BUILDING 100 - SECOND FLOOR PLAN SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - SECOND FLOOR PLAN3/32" = 1'-0" A3.13 A1(b) A1(b) A1(b) A1(b)A1(b)A1(b)A1(b) B1(b) B1(b) B1(b)A2(b)A2(b)A2(b) A2(b) A3(b) A3(b) B3(b) 320318316314309 321319317315313 308 306 304 307 310 312 311 E.M.M. M. B1(b) A1(b)303 305 301 302 E. M. A2(b)323 M. A1(b)322 A2(b)324 A1(b)-ENDA1(b)-END 2018-0786-6-2023VJT BUILDING 100 - THIRD FLOOR PLAN SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - THIRD FLOOR PLAN3/32" = 1'-0" A3.13 408 406 404 407 A1(b) A1(b) B4(b)B1(b) M. E. B1(b) A1(b)403 405 401 402 E. M. A1(b)-ENDA1(b)-END 2018-0786-6-2023VJT BUILDING 100 - FOURTH FLOOR PLAN SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - FOURTH FLOOR PLAN3/32" = 1'-0" A3.13 14":12 12"X6" SCUPPER 14":1214":12 12"X6" SCUPPER 12"X6" SCUPPER 2018-0786-6-2023VJT BUILDING 100 - ROOF FLOOR PLAN SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - ROOF FLOOR PLAN3/32" = 1'-0" 14":12 12"X6" SCUPPER 14":12 14":12 12"X6" SCUPPER 15'-0"5'-0" 22'-0" 1'-0"13'-0"1'-0" 1'-0"20'-0"1'-0" METAL ROOFING B/ ROOF TRUSS BEARINGELEV. = 9'-6" SLAB FINISHELEV. = SEE CIVIL DWGS. 2018-0788-8-2023VJT PICNIC PAVILION DETAIL SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1PICNIC PAVILION FLOOR PLAN1/4" = 1'-0" 2PICNIC PAVILION ROOF PLAN1/4" = 1'-0" 3PICNIC PAVILION ELEVATION1/4" = 1'-0" 2'-2" TYP. ELEV. = +32' - 014" ELEV. = +21' - 412" THIRD FLOOR FINISH FLOOR FOURTH FLOOR FINISH FLOORR-19 SOUND ATTENUATION FACED BATTINSUL. PINNED TO UNDERNEATH OFDECKING TYP., @ ALL UNITS 58" TYPE "x" GYP. BOARD @ ALL INTERIOR &EXTERIOR WALL ASSEMBLIES, TYP. R-19 BATT INSUL. UNFACED FRICTION FIT,TYP. @ ALL EXTERIOR WALL ASSEMBLIES 58" TYPE "x" GYP. BOARD @ ALL INTERIOR& EXTERIOR WALL ASSEMBLIES, TYP. R-19 BATT INSUL. UNFACED FRICTION FIT,TYP. @ ALL EXTERIOR WALL ASSEMBLIES 58" TYPE "x" GYP. BOARD @ ALL INTERIOR & EXTERIORWALL ASSEMBLIES, TYP. 58" TYPE "c" GYP. BD. ON RESILIENT CHANNELS @ 16"O.C., TYP. THROUGHOUT 1st, 2nd, & 3rd FLOOR CEILINGS 58" TYPE "c" GYP. BD. ON RESILIENT CHANNELS @ 16"O.C., TYP. THROUGHOUT 1st, 2nd, & 3rd FLOOR CEILINGS R-19 SOUND ATTENUATION FACED BATT INSUL. PINNEDTO UNDERNEATH OF DECKING TYP., @ ALL UNITS FIBER CEMENT LAP SIDING -SEE SHEETS A3.1-A3.3 FORLOCATIONSR-19 BATT INSUL. UNFACEDFRICTION FIT, TYP. @ ALLEXTERIOR BAND JOIST R-19 BATT INSUL. UNFACEDFRICTION FIT, TYP. @ ALLEXTERIOR BAND JOIST 114" x 4" FIBER CEMENT TRIM, TYP. FIBER CEMENT WINDOW SILL, TYP. 18" PRE-ENGINEERED FLOOR TRUSSES, TYP. U.N.O. 18" PRE-ENGINEERED FLOOR TRUSSES,TYP. U.N.O.MOISTURE BARRIER TYVEKOR EQUAL OVER 12" OX-ISBOARD INSULATEDSHEATHING, TYP. @ ALLEXTERIOR WALLS. T/ OF ROOF PARAPETELEV. = +36' - 4" B/ OF ROOF TRUSS BEARINGELEV. = +41' - 0 58" SIMPSON H10A HURR. TIE @ EA. END OF ALL TRUSSES R-38 BLOWN-IN FIBERGLASS INSULATION.PROVIDE CARDS & RULERS, TYP.14" SLOPE PRE-ENGINEERED ROOF TRUSSESTPO ROOFING MEMBRANE, EXTEND DOWNWALL TO W/ TERMINATION BAR 14" GAP & SEAL w/ ACOUSTICAL RUBBER CAULKING @T/ PLATE TO DRYWALL THROUGHOUT CEILINGS, TYP.114" x 6" FIBER CEMENTWINDOW HEAD, TYP. 114" x 8" FIBER CEMENT FREIZEBOARD @ PARAPETS 114" x 6" FIBER CEMENT TRIM BAND58" TYPE "c" GYP. BD. ON RESILIENTCHANNELS @ 12" O.C., TYP.2'-2" TYP. 34" POURED UNDERLAYMENTON 2332" T&G DECKING W/SOUNDMAT UNDERLAYMENTIN UNITS @ ALL HARDSURFACE LOCATIONS 34" POURED UNDERLAYMENTON 2332" T&G DECKING W/SOUNDMAT UNDERLAYMENTIN UNITS @ ALL HARDSURFACE LOCATIONS FIBER CEMENT 1x BOARDS TOWRAP PARAPET CORNICEFRAMING. CAULK EDGES ANDSEAMSTPO ROOFING MEMBRANE,EXTEND 8" UP WALL W/TERMINATION BAR PREFINISHED PERFORMED SHEET METAL COPING FASTEDTO PLYWOOD SUBSTRATE AT THE TOP OF PARAPET WALLHEAT-WELDABLE L-SHAPEDDRIP EDGE WITH HEMMEDEDGE 114" x 4" FIBER CEMENT TRIM, TYP. FIBER CEMENT WINDOW SILL, TYP. 8" 2'-0" TYP.2'-0" TYP. FIRST FLOOR FINISH FLOORELEV. = SEE CIVIL DWGS. ELEV. = +10' - 858" SECOND FLOOR FINISH FLOOR 4" #57 GRAVEL BED BENEATH SLAB, TYP. 34" POURED UNDERLAYMENT ON 2332" T&G DECKING W/SOUNDMAT UNDELAYMENT IN UNITS @ ALL HARDSURFACE LOCATIONS 58" TYPE "x" GYP. BOARD @ ALL INTERIOR &EXTERIOR WALL ASSEMBLIES, TYP. R-19 BATT INSUL. UNFACED FRICTION FIT, TYP. @ ALLEXTERIOR WALL ASSEMBLIES 2x6 P.T. PLATE W/ 12" GALV. ANCHOR BOLTS @36" O.C. W/ 7" EMBED MIN. IN CONC. TYP., @ ALLEXTERIOR WALLS U.N.O.CAPILLARY SEAL BTW. ALL P.T. B/ PLATES &FOUNDATIONS, TYP. 58" TYPE "c" GYP. BD. ON RESILIENT CHANNELS @16" O.C., TYP. THROUGHOUT 1st, 2nd, & 3rd FLOORCEILINGS R-19 SOUND ATTENUATION FACED BATT INSUL. PINNEDTO UNDERNEATH OF DECKING TYP., @ ALL UNITS 4" CONC. SLAB W/ 6x6 W1.4xW1.4 WWM @112" FROM T/ SLAB R-19 BATT INSUL. UNFACEDFRICTION FIT, TYP. @ ALLEXTERIOR BAND JOIST 1x6 FIBER CEMENT TRIMBOARD W/ 14" GAP BTW. FIBERCEMENT TRIM & MASONRYVENEER, TYP. BRICK VENEER W/ 22 GA. 78" WIDE GALV. MTL. TIES @ 16"O.C. VERT. & 24" O.C. HORIZ.,TYP.PROVIDE WAFFLE WEEPHOLES @ 32" O.C. BYOMITTING VERT. MORTARJOINTSGRADE 8" MIN. BELOW FINISHFLOOR - SEE CIVIL DWGS. 18" PRE-ENGINEERED FLOOR TRUSSES, TYP. U.N.O. MOISTURE BARRIER TYVEKOR EQUAL OVER 12" OX-ISBOARD INSULATEDSHEATHING, TYP. @ ALLEXTERIOR WALLS (1) LAYER OF 10 MIL. POLY.VAPOR BARRIER (LAP & TAPEALL SEAMS & JOINTS) 114" x 4" FIBER CEMENT TRIM, TYP. FIBER CEMENT WINDOW SILL, TYP. 12 CONT. METAL FLASHING 34" DOWN FACE OF BRICK SOLDIER& EXTENDED 4" UP WALL W/BACKER ROD & SEALANTUNDER FLASHING EDGEPOLYETHYLENE CLOSED CELLFOAM @ WALL BASE &GYPCRETE @ ALL UNITS, TYP.BRICK SOLDIER COURSEPROJ. 12", TYP. 18" PRE-ENGINEERED FLOORTRUSSES, TYP. U.N.O. - SEESHEETS A4.6 - A4.14 FORORIENTATION & LOCATIONS. 58" TYPE "x" GYP. BOARD @ ALL INTERIOR &EXTERIOR WALL ASSEMBLIES, TYP. MOISTURE BARRIER (TYVEK OREQUAL) OVER 12" OX-IS BOARDINSULATED SHEATHING, TYP. @ALL EXTERIOR WALLS. SEESHEET A4.1 FOR NAILINGSCHEDULE R-19 SOUND ATTENUATIONFACED BATT INSUL. PINNEDTO UNDERNEATH OFDECKING TYP., @ ALL UNITS 1x6 FIBER CEMENT TRIM BOARDW/ 12" GAP BTW. FIBER CEMENTTRIM & MASONRY VENEER, TYP. FINISH FLOOR F.F.ELEV. = VARIES BRICK VENEER W/ 22 GA. 78" WIDE GALV. MTL. TIES @ 16"O.C. VERT. & 24" O.C. HORIZ.,TYP. (MAINTAIN 1" AIR SPACE @ALL BRICK LOCATIONS)14" GAP & SEAL W/ ACOUSTICALRUBBER CAULKING @ T/ PLATETO DRYWALL THROUGHOUTCEILINGS, TYP. 1/2" PRE-FINISHED MTL. FLASHING W/ DRIPEDGE EXTENDED 6" UP WALL & TAPED TOTYVEK W/ BACKER ROD & CAULKED, TYP. FIRST FLOOR F.F.ELEV. = SEE CIVIL 1/2"1/2"12 CONT. METAL FLASHING 34" DOWN FACE OF BRICK ROWLOCK& EXTENDED 4" UP WALL W/BACKER ROD & SEALANT UNDERFLASHING EDGEBRICK ROWLOCK COURSEW/ 1:2 SLOPE &PROJECTED 12", TYP.BRICK SOLDIER COURSEPROJ. 12", TYP. MOISTURE BARRIER (TYVEK OREQUAL) OVER 12" OX-IS BOARDINSULATED SHEATHING, TYP. @ALL EXTERIOR WALLS.1x6 FIBER CEMENT TRIM BOARDW/ 12" GAP BTW. FIBER CEMENTTRIM & MASONRY VENEER, TYP. BRICK VENEER W/ 22 GA. 78" WIDE GALV. MTL. TIES @ 16"O.C. VERT. & 24" O.C. HORIZ.,TYP. (MAINTAIN 1" AIR SPACE@ ALL BRICK LOCATIONS) 58" TYPE "x" GYP. BOARD @ ALL INTERIOR& EXTERIOR WALL ASSEMBLIES, TYP.PRE-FINISHED MTL. FLASHING W/ DRIPEDGE EXTENDED 6" UP WALL & TAPED TOTYVEK W/ BACKER ROD & CAULKED, TYP. (4) 2x6 BLOCKINGHPT 372 PL EA. SIDE W/10 DHDG NAILS4X4 P.T.HPT 372 PL EA. SIDE W/ 10DHDG NAILS 2x6 P.T.(2) 2x6 BLOCKING4x4 P.T. 2122'-6"METAL ROOFING SYSTEMOVER 30 LB. ROOFING FELTON A.P.A. SPAN RATED 16/24DECKING 15/32" MIN.PLYWOOD OR O.S.B., TYP. 11-HOUR RATED EXTERIOR WALL SECTION @ PARAPET (UL U356)1/2" = 1'-0" 2018-0788-30-2023VJT WALL SECTION DETAILS2022 PRELIMINARY DRAWING SETEXTERIOR WALL SECTION DETAIL @ BRICK CAP TO BRICK VENEER (UL U356)1 1/2" = 1'-0"2 EXTERIOR WALL SECTION DETAIL @ BRICK SOLDIER COURSE TO TRIM BAND (UL U356)1 1/2" = 1'-0"3 EXTERIOR WALL SECTION DETAIL @ AWNING1 1/2" = 1'-0"4 A1.73 A1.73 A1.73 2018-0788-30-2023VJT MATERIAL SPECIFICATIONS2022 PRELIMINARY DRAWING SETBRICKMANUFACTURER: CHEROKEE BRICK & TILE COMPANYPRODUCT DESCRIPTION: M/S VELOUR RED, MODULAR W/MORTAR LAP SIDING - 1MANUFACTURER: JAMES HARDIEPRODUCT DESCRIPTION: HARDIE PLANK LAP SIDINGTEXTURE: SMOOTH TRIM BOARDSMANUFACTURER: JAMES HARDIEPRODUCT DESCRIPTION: 4/4, 5/4, HARDIE TRIM BOARDSTEXTURE: SMOOTHCOLOR: ARCTIC WHITE PANEL BOARDSMANUFACTURER: JAMES HARDIEPRODUCT DESCRIPTION: HARDIE ARCHITECTURAL COLLECTION FINE SAND GROOVEDTEXTURE: SMOOTH METAL ROOFMANUFACTURER: SMITH-BUILT METAL ROOFS & BUILDINGSPRODUCT DESCRIPTION: MASTER-RIB ROOF SYSTEMCOLOR: RUSTIC RED SR 32 SRI 33 DOORMANUFACTURER: WINDOORPRODUCT DESCRIPTION: CLEAR LOW -E 1464-1L, 2054-1L, 2264-1L WINDOWMANUFACTURER: SILVERLINE WINDOWSPRODUCT DESCRIPTION: DOUBLE HUNG - V1 SERIESCOLOR: WHITE EVENING SHADOW (SW7662)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #C9CCCDLOCATION: EXTERIOR LAP SIDINGWESTHIGHLAND WHITE (SW7566)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #F3EEE3LOCATION: EXTERIOR LAP SIDING HONEY BLUSH (SW6660)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #F5CF9BLOCATION: EXTERIOR FIBER CEMENT PANEL KILIM BEIGE (SW6106)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #D7C5AELOCATION: EXTERIOR FIBER CEMENT PANEL LATTE (SW6108)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #BAA185LOCATION: EXTERIOR FIBER CEMENT PANEL EXTERIOR COLOR SPECS: T/ FOURTH FLOOR FINISHELEV. = +32'-9" T/ THIRD FLOOR FINISHELEV. = +21'-4 12" T/ FIRST FLOOR FINISHELEV. = SEE CIVIL T/ SECOND FLOOR FINISHELEV. = +10'-8 58" B/ ROOF TRUSS BEARINGELEV. = +41'-9"T/ FOURTH FLOOR FINISHELEV. = +32'-9" T/ THIRD FLOOR FINISHELEV. = +21'-4 12" T/ FIRST FLOOR FINISHELEV. = SEE CIVIL T/ SECOND FLOOR FINISHELEV. = +10'-8 58" T/ FOURTH FLOOR FINISHELEV. = +32'-9" T/ THIRD FLOOR FINISHELEV. = +21'-4 12" T/ FIRST FLOOR FINISHELEV. = SEE CIVIL T/ SECOND FLOOR FINISHELEV. = +10'-8 58" B/ ROOF TRUSS BEARINGELEV. = +41'-9"T/ FOURTH FLOOR FINISHELEV. = +32'-9" T/ THIRD FLOOR FINISHELEV. = +21'-4 12" T/ FIRST FLOOR FINISHELEV. = SEE CIVIL T/ SECOND FLOOR FINISHELEV. = +10'-8 58" 2018-0786-6-2023VJT BUILDING 100 - ELEVATIONS 7-24-2023 SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - SOUTH ELEVATION 3/32" = 1'-0" BLDG. 200 MIRROR IMAGE 2BUILDING 100 - WEST ELEVATION3/32" = 1'-0" BLDG. 200 MIRROR IMAGE E CB G B G C BAARCHITECTURAL ANTI-FUNGAL FIBERGLASS SHINGLES (MIN. 30 YR) - COLOR GAF TIMBERLINE HDZ " PEWTER GRAY"HARDIE FIBER CEMENT PLANK LAP SIDING W/ 8" EXPOSURE - PAINTED SHERWIN WILLIAMS SW7566"WESTLANDHIGH WHITE" - FLAT FINISHC E HARDIE FIBER CEMENT PLANK LAP SIDING W/ 8" EXPOSURE - PAINTED SHERWIN WILLIAMS SW7662 "EVENINGSHADOW" - FLAT FINISHD4'x8' FIBER CEMENT PANELS - PAINTED SHERWIN WILLIAMS "LATTE" (INSTALL TYVEK DRAINVENT RAINSCREENBEHIND ALL FIBER CEMENT PANEL LOCATIONS, TYP.)4'x8' FIBER CEMENT PANELS - PAINTED SHERWIN WILLIAMS "HONEY BLUSH" (INSTALL TYVEK DRAINVENTRAINSCREEN BEHIND ALL FIBER CEMENT PANEL LOCATIONS, TYP.)4'x8' FIBER CEMENT PANELS - PAINTED SHERWIN WILLIAMS "KILIM BEIGE" (INSTALL TYVEK DRAINVENT RAINSCREENBEHIND ALL FIBER CEMENT PANEL LOCATIONS, TYP.)BRICK VENEER #1 - CHEROKEE BRICK - 'SAPELO'GF PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE: 2018-0786-6-2023VJT BUILDING RENDER @ SOUTH-EAST SIDE 7-24-2023 PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE: 2018-0786-6-2023VJT BUILDING RENDER @ SOUTH-EAST SIDE (MAIN ENTRANCE) 7-24-2023 PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE: 2018-0786-6-2023VJT BUILDING RENDER @ EAST SIDE (SALEM ROAD) 7-24-2023 PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE: 2018-0786-6-2023VJT BUILDING RENDER @ NORTH-EAST SIDE 7-24-2023 PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE: 2018-0786-6-2023VJT BUILDING RENDER @ SOUTH-EAST SIDE 7-24-2023 Page Beaufort Senior Apartments 1 MARTIN RILEY ASSOCIATES - ARCHITECTS, P.C. 215 CHURCH ST. SUITE 200 DECATUR GEORGIA 30030-3329 404-373-2800 Response to comments (8-11-2023) RE: Board Comments Proposed Beaufort Senior Apartments, Beaufort, SC 1. Applicant to consider simplification of the east facades in terms of materiality as illustrated on sheet A3.1. a. See revised east façade elevations on sheets A3.1 & A3.5. 2. Applicant to restudy the material transitions at the corner as illustrated on sheet A3.4. a. See revised building render on sheet A3.4. 3. Applicant to provide color samples and specs (full exterior material selections). a. See sheet A1.8. 4. Applicant to provide necessary wall sections to understand material interactions and profiles (in addition to staff’s comments, the board would like to understand the parapet conditions around the project). a. See detail #1 & #2 on sheet A1.7. 5. On sheet A3.1, applicant to consider expanding the porch at the commercial leasing office to cover the window (porch floor and roof). a. See revised elevation #1 on sheet A3.1. 6. Applicant to come back to DRB with revisions. a. See revised drawing set.

Source: City of Beaufort website. First collected Nov 20, 2026.