Design Review Board Meeting (Agenda Packet)
City of Beaufort · Beaufort County · meeting of Sep 14, 2023 · Agenda packets
Open the original document More from City of Beaufort
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MEETING AGENDA
The City of Beaufort
DESIGN REVIEW BOARD
Thursday, September 14, 2023, 2:00 P.M.
City Hall, Council Chambers, 2nd Floor – 1911 Boundary Street, Beaufort, SC
Please click the link below to join the webinar:
https://us02web.zoom.us/j/83564851031?pwd=WWJ2VUcwSjVSU09EbDlxMmVkcTc0QT09
Passcode: 159940 Meeting ID: 835 6485 1031 Call in Phone#: 1+929-205-6099
STATEMENT OF MEDIA NOTIFICATION:
"In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, all local
media were duly notified of the time, date, place and agenda of this meeting."
Note: A project will not be reviewed if the applicant or a representative is not present at the meeting.
I. Call to Order
II. Review of Minutes:
A. Minutes of August 10, 2023 Meeting
III. Applications:
A. Beaufort Senior Apartments, PIN R122 029 000 0625 0000, 1556 Salem Road.
Applicant: Michael Riley, Architect (23-02 DRB.5)
The applicant is requesting final site plan approval for a 154-unit senior apartment building
including (88) 1-bedroom units, (66) 2-bedroom units with on-site parking.
IV. Discussion
V. Adjournment
1
Design Review Board
Meeting Minutes – August 10, 2023
CALL TO ORDER 0:30
A meeting of the Design Review Board was held in-person on Thursday, August 10, 2023 at 2:00 pm.
ATTENDEES
Members in attendance: Benjie Morillo (Chairman), Kim McFann (Vice-Chair), Erik Petersen, Clinton
Hallman, and Bill Suter.
Staff in attendance: Curt Freese (Community Development Director).
REVIEW OF MINUTES 2:17
Motion: Ms. McFann made a motion to approve the April 13, 2023 minutes; seconded by Mr. Suter.
The motion passed unanimously.
All Historic District Review Board Meeting minutes are recorded and can be found on the City’s website at
http://www.cityofbeaufort.org/AgendaCenter. Audio recordings are available upon request by contacting the City
Clerk, Traci Guldner at 843-525-7024 or by email at tguldner@cityofbeaufort.org.
APPLICATIONS
A. Battery Creek Apartments, PIN R120 028 00A 0409/0410/0411/0412/0413/0000, 2:35
25 Old Jericho Road
Applicant: Ryan Lyle, Andrews Engineering (23-01 DRB.4)
The applicant is requesting site plan approval of an 83-unit four-story apartment building with
a pool and pool cabana and on-site parking.
Motion: Ms. McFann made a motion based on the findings on pages three and four of the
staff report. We recommend final approval of the site plan which is approval of the project as
a whole subject to staff recommendations on page 5 of the staff recommendations; site and
landscaping number 1-5; architecture 1-3 with the following additional conditions:
1. Add low trees along the Jericho Road sidewalk consistent with utility considerations.
2. Regarding Beaufort Jasper Water & Sewer Authority infrastructure as a condition that
the project cannot be built until the infrastructure is in place and planned for and put
a three-year time limit on the infrastructure being in place and the ability to build. If
2
they cannot start within that three-year period, the project would need to reapply for
site plan approval to the Design Review Board or the subsequent body that does site
plan approvals in the future.
3. Consider moving the shed roof down over the four court or making other
modifications to the four-car court to make the entryway more inviting.
_____ seconded the motion. The motion passed unanimously.
B. Beaufort Senior Apartments, PIN R122 029 000 0625 0000, 1556 Salem Road 55:39
Applicant: Michael Riley, Architect (23-02 HRB.5)
The applicant is requesting site plan approval for a 154-unit senior apartment building
including (88) 1-bedroom units, (66) 2-bedroom units with on-site parking.
Motion: Ms. McFann made a motion for final approval of the project to be deferred and the
applicant come back before the Design Review Board after working with staff and the
architect and that they consider doing the following:
1. As to page A3.1, the east elevation, considers simplification or change of the materials
regarding the east elevation.
2. On page A3.4 consider simplifying the transitions of materials as shown in the
drawings.
3. Provide color of real color samples when coming back.
4. Show cross section of parapet back on page A3.1
5. Also, on page A3.1, consider extension of the roof on the first floor farther over to the
left-hand side over the windows adjacent to the roof section as shown.
______ seconded the motion. The motion passed unanimously.
C. ALDI - Beaufort, PIN R120 028 000 0138 0000, 361 Robert Smalls Parkway 1:24:53
Applicant: Vanessa Banks, APD Engineering & Architecture, PLLC (23-09 DRB.1)
The applicant is requesting conceptual approval for a new Aldi Grocery store on an outparcel
facing Robert Smalls Parkway in the Beaufort Station shopping center.
Motion: ________ made a motion to table the project. ________ seconded the motion.
The motion passed with a vote of 4:1.
Ms. McFann asked staff for a status of the structural changes. Mr. Freese state text
amendments are going back to the MPC on August 21 with some revisions and that the new
Board would have seven members.
ADJOURNMENT 2:47:30
Motion: Ms. McFann made a motion, seconded by Mr. Petersen, to adjourn the meeting at 4:47 pm.
SALEM SENIOR
HOUSING FINAL
STAFF REPORT: 1556 Salem Road Site Plan/Senior Housing
DATE: September 14, 2023
GENERAL INFORMATION
Applicant: Mike Riley, Agent for Beaufort Senior Apartments
Site Location/Address: 1556 Salem Road/R 120 004 000 1007 0000
Applicant's Request: The Applicant is requesting site plan approval for a 154-unit senior
apartment building including (88) 1-bedroom units, (66) 2-bedroom units
with on-site parking in the T4-N district.
Current Zoning: T-4 N
ZONING DISTRICT INFORMATION
T-4 N
Max Density N/A
Min. Lot Size N/A
Min. Frontage Build Out 60%- 85 % min
Front Setback 0’ min/15’ max
Side Setback 0-15 max
Rear Setback 10’
Building Height: 4 stories
SURROUNDING ZONING, LAND USE AND REQUIRED BUFFERS
Adjacent Zoning Adjacent Land Uses Setbacks for Adjacent Zoning
/Buffer required if rezoned
North: T-4 N Vacant/Commercial N/A
South: T-4 N Townhouses N/A
East: T-3S Single family homes/U-haul N/A
West: T-4N Car dealership/Used Car dealer N/A
Background: The project has been in review for some time, and across three different Community
Development Administrations. The applicant first participated in a pre-design meeting on 12/8/2020
and a revision meeting on 3/2/2022. The applicant met with the city on 4/26/2022 and then attended a
pre-app meeting with the city on 11/2/2022. This application was deferred at the January 2023 DRB
meeting. The applicant met with city staff at the 2/28/2023 TRC meeting and had further informal
meetings in April. The current Staff has raised issues that heretofore were unaddressed through the last
2 years. The Applicant has made significant changes to the layout based on Staff comments discussed in
April, May, and June.
2
Since August 8 DRB meeting
The project was heard at the August 8 DRB meeting, with the DRB tabling with the request to add
cutsheets for walls, consider wider bays at the entrances, gang window fenestration, provide detail for
HVAC location, details for the picnic pavilion, and otherwise provide all cutsheets for all building sections.
The Applicant has provided additional detail, which has been reviewed by Staff.
Streets:
Salem road is a two-lane road, with a drainage ditch and no sidewalks. The applicant would build a
sidewalk along their portion of the road, which would link to the County’s funded Salem Road sidewalk
project. Thomas and Hutton Engineers verified that the project would not generate more than 50 or
more trips per hour, and thus the TIA is not required as per the Development Code.
Access:
The Applicant is proposing to build two entrance points at the center and North end of the property.
They have moved the proposed Southern entrance due to Staff concerns about visibility and safety on the
sharp curve. The Northern Entrance would be a shared access drive with the adjoining Northern
property.
Lots and Blocks:
While the property is zoned T4-N, a typical urban lot and block street pattern does not currently exist.
Moreover, due to the sharp curve, creek, and natural features to the South, an urban grid pattern cannot
continue Southward. There is a car dealership on the adjoining non-Salem side of this lot. An urban grid
could be built to the North of this property. In addition, the new layout creates a more urban pattern.
Heights:
A four-story bank building exists two lots away along HWY 170. However, the adjoining properties all
are either one story commercial buildings, with two story houses across the street, and several of two-
story fourplexes to the South. T4-N requires a 2-story height minimum per code. Upon Staff suggestion,
the applicant has stepped back the four-story height from the street, so the wings of each building are 4
stories, and the buildings along Salem are only three stories.
Future Land Use:
3
The Area is planned for Urban uses and development.
Zoning:
The zoning of the property T4-N does not have a density limit, but does regulate a four-story maximum
height, and basic setbacks to the road. The use of multi-family senior housing is a permitted use in the T-4
N district.
Amenities: A community garden is planned in the center open space as per Staff’s suggestion. There is
also a small gazebo in the center of the lot.
Staff Comments
Section 9.8.3 Decisions/Findings of Fact: Following the public meeting, the Design Review Board may
approve, deny, or approve with conditions the application for a Major Development. No Major
Development shall be approved unless the following findings of fact can be made:
9.8.3 Finding of Fact Rationale
Present
(yes/no)
Staff Analysis of Rationale
1. The plan is consistent with the
adopted plans and policies of the City.
Yes The plan is consistent with density, use
and setbacks of the T4-N district, and the
future land use plan.
The applicant has taken Section of 9.8.3
into consideration, and has altered the
height, scale and mass accordingly to
respect the surrounding built form.
2. The plan complies with all
applicable requirements of this Code.
Yes Staff believes the project complies with
the major requirements of the code, and
minor architectural revisions would be
appropriate at the Final approval.
3. There exists adequate
infrastructure (transportation and
utilities) to support the plan as
proposed.
Yes The applicant is providing curb and
gutter, sidewalks and urban amenities
and scale as required by the T-4 N district.
While there is not urban infrastructure
around the project, it is entitled with
urban district standards, and the project
should make for a more urban block
sympathetic to transect based
4
development in the future.
4. The proposed plan conforms to the
character of the neighborhood,
considering the location, type and
height of buildings or structures and
the type and extent of landscaping on
the site
Yes The properties to the North and West are
commercial in nature and should develop
in an urban fashion as per their urban
transect zones. The Senior homes will
establish an urban form in an otherwise
non-urban area as required by the
Beaufort Code.
Staff acknowledges the lack of mass, scale,
and type of buildings in the general
vicinity. This has been relayed to the
applicant who has revised their plans
accordingly by limiting the fourth story,
breaking up the mass, stepping the
buildings back, adding curb and gutter,
and more open space/landscaping.
5. The proposed plan conforms to the
Building Design Standards in Article 4.
Yes Applicant has demonstrated compliance
with Section 4.6.3.C.1 and many of the
architectural standards of the Beaufort
Code.
The applicant has made many changes
There are a number of architectural
details and changes Staff recommended
that have been followed by the Applicant.
Staff has made final recommendations for
the Final approval that Staff believes will
resolve any other issues regarding this
finding.
6.The application will not substantially
lessen the value of adjoining or
abutting property and will not be
detrimental to the use or development
of adjacent properties or other
neighborhood uses.
Yes The surrounding properties have T-4N
and T-5 UC zoning classifications, and
expectations of density.
Affordable senior housing is a pressing
need for the Beaufort community, and
this request will serve to satisfy a portion
of this need.
5
FINDINGS AND RECOMMENDATIONS
Staff Recommendation:
Staff recommends Final approval of the application at 1556 Salem Road, in that is satisfies the
findings and requirements of Section 9.8.3 the Beaufort Code found in pages 2-4 of this Staff
Report with the following conditions:
1. Staff recommends the applicant consider a more neutral metal roof color as opposed to the
Rustic Red given the other proposed colors on the project. Applicant may consider a bronze
or dark bronze color.
2. Applicant notes on A1.8 the roof is a master-rib roof system. Staff does not support this
bulky roof profile and recommends a simpler standing seam with smooth panel between
the seams.
3. Staff recommends the applicant select SDL windows.
4. Detail 4 on sheet A1.7 illustrated metal tie plates on the wood timber support brackets.
Staff recommends the applicant eliminate these visible tie plates and instead use concealed
fasteners to fabricate these brackets.
5. Applicant to note the color of the continuous metal flashing above brick soldier course
around the building. Staff recommends a neutral color such as bronze or dark bronze for
this transition.
6. Applicant to confirm that the parapet cap flashing is white per the colored elevation.
7. On sheet A1.7, the projecting windowsills do not appear to be sloped to drain. Applicant to
confirm.
8. The larger scale wall section 1 on sheet A1.7 has detail callouts for the windowsills
referencing detail 3 on sheet A1.7. However, this is not the correct reference and larger
scale projecting windowsill details are missing from application.
9. Applicant must provide a typical wall section through a porch to identify the interaction
and details related to these areas around the building.
10. It appears that the color swatch representation of Latte and Kilim Beige on sheet A1.8 are
incorrect compared to actual swatches from Sherwin Williams. Applicant to confirm and
bring to meeting actual color samples. Staff supports the colors Latte and Kilim Beige.
However, the proposed Honey Blush doesn’t seem to go well with the other material colors.
Staff recommends the applicant provide an alternate color to the Honey Blush and would
recommend staying within the same color range as Latte and Kilim Beige.
11. On picnic pavilion, staff recommends the applicant align the band beam with the column
shafts below.
6
A1(b)-ENDA1(b)-END
B1(b)
A1(b)
A1(b)
A1(b)
A1(b)A1(b)A1(b)A1(b)A1(b) A2(b)
A1(b)
B1(b)
B1(b)
B1(b)-PATIOB2(b)-PATIO A2(b) - PATIO
124122120118116114109
123121119117115113
108
106
104
107
103
105
101 102
M.E.M.M.
M.
M.
COMMUNITYAREAS
LEASING OFFICE& COMMUNITYAREAS
E.
E.
B2(b)-PATIOB2(b)-PATIOB2(b)-PATIO
90'-612" 48'-3" 48'-2"234'-512"
2018-0786-6-2023VJT BUILDING 100 - FIRST FLOOR PLAN
SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - FIRST FLOOR PLAN3/32" = 1'-0"
A3.13
A1(b)
A1(b)
A1(b)
A1(b)A1(b)A1(b)A1(b)A1(b) A2(b)
B1(b)
B1(b)
B1(b)B2(b) A2(b)
A3(b)
A3(b)
B3(b)
224222220218216214209
223221219217215213
208
206
204
207
210
212
211
M.E.M.M.
M.
A1(b)-END
B1(b)
A1(b)203
205
201 202
E.
M.
B2(b)B2(b)B2(b)
A1(b)-END
2018-0786-6-2023VJT BUILDING 100 - SECOND FLOOR PLAN
SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - SECOND FLOOR PLAN3/32" = 1'-0"
A3.13
A1(b)
A1(b)
A1(b)
A1(b)A1(b)A1(b)A1(b)
B1(b)
B1(b)
B1(b)A2(b)A2(b)A2(b) A2(b)
A3(b)
A3(b)
B3(b)
320318316314309
321319317315313
308
306
304
307
310
312
311
E.M.M.
M.
B1(b)
A1(b)303
305
301 302
E.
M.
A2(b)323
M.
A1(b)322 A2(b)324
A1(b)-ENDA1(b)-END
2018-0786-6-2023VJT BUILDING 100 - THIRD FLOOR PLAN
SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - THIRD FLOOR PLAN3/32" = 1'-0"
A3.13
408
406
404
407
A1(b)
A1(b)
B4(b)B1(b)
M.
E.
B1(b)
A1(b)403
405
401 402
E.
M. A1(b)-ENDA1(b)-END
2018-0786-6-2023VJT BUILDING 100 - FOURTH FLOOR PLAN
SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - FOURTH FLOOR PLAN3/32" = 1'-0"
A3.13
14":12
12"X6" SCUPPER
14":1214":12
12"X6" SCUPPER 12"X6" SCUPPER
2018-0786-6-2023VJT BUILDING 100 - ROOF FLOOR PLAN
SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - ROOF FLOOR PLAN3/32" = 1'-0"
14":12
12"X6" SCUPPER
14":12 14":12
12"X6" SCUPPER
15'-0"5'-0"
22'-0"
1'-0"13'-0"1'-0"
1'-0"20'-0"1'-0"
METAL ROOFING
B/ ROOF TRUSS BEARINGELEV. = 9'-6"
SLAB FINISHELEV. = SEE CIVIL DWGS.
2018-0788-8-2023VJT PICNIC PAVILION DETAIL
SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1PICNIC PAVILION FLOOR PLAN1/4" = 1'-0" 2PICNIC PAVILION ROOF PLAN1/4" = 1'-0"
3PICNIC PAVILION ELEVATION1/4" = 1'-0"
2'-2" TYP.
ELEV. = +32' - 014"
ELEV. = +21' - 412" THIRD FLOOR FINISH FLOOR
FOURTH FLOOR FINISH FLOORR-19 SOUND ATTENUATION FACED BATTINSUL. PINNED TO UNDERNEATH OFDECKING TYP., @ ALL UNITS
58" TYPE "x" GYP. BOARD @ ALL INTERIOR &EXTERIOR WALL ASSEMBLIES, TYP.
R-19 BATT INSUL. UNFACED FRICTION FIT,TYP. @ ALL EXTERIOR WALL ASSEMBLIES
58" TYPE "x" GYP. BOARD @ ALL INTERIOR& EXTERIOR WALL ASSEMBLIES, TYP.
R-19 BATT INSUL. UNFACED FRICTION FIT,TYP. @ ALL EXTERIOR WALL ASSEMBLIES
58" TYPE "x" GYP. BOARD @ ALL INTERIOR & EXTERIORWALL ASSEMBLIES, TYP.
58" TYPE "c" GYP. BD. ON RESILIENT CHANNELS @ 16"O.C., TYP. THROUGHOUT 1st, 2nd, & 3rd FLOOR CEILINGS
58" TYPE "c" GYP. BD. ON RESILIENT CHANNELS @ 16"O.C., TYP. THROUGHOUT 1st, 2nd, & 3rd FLOOR CEILINGS
R-19 SOUND ATTENUATION FACED BATT INSUL. PINNEDTO UNDERNEATH OF DECKING TYP., @ ALL UNITS
FIBER CEMENT LAP SIDING -SEE SHEETS A3.1-A3.3 FORLOCATIONSR-19 BATT INSUL. UNFACEDFRICTION FIT, TYP. @ ALLEXTERIOR BAND JOIST
R-19 BATT INSUL. UNFACEDFRICTION FIT, TYP. @ ALLEXTERIOR BAND JOIST
114" x 4" FIBER CEMENT TRIM, TYP. FIBER CEMENT WINDOW SILL, TYP.
18" PRE-ENGINEERED FLOOR TRUSSES, TYP. U.N.O.
18" PRE-ENGINEERED FLOOR TRUSSES,TYP. U.N.O.MOISTURE BARRIER TYVEKOR EQUAL OVER 12" OX-ISBOARD INSULATEDSHEATHING, TYP. @ ALLEXTERIOR WALLS.
T/ OF ROOF PARAPETELEV. = +36' - 4"
B/ OF ROOF TRUSS BEARINGELEV. = +41' - 0 58"
SIMPSON H10A HURR. TIE @ EA. END OF ALL TRUSSES
R-38 BLOWN-IN FIBERGLASS INSULATION.PROVIDE CARDS & RULERS, TYP.14" SLOPE PRE-ENGINEERED ROOF TRUSSESTPO ROOFING MEMBRANE, EXTEND DOWNWALL TO W/ TERMINATION BAR
14" GAP & SEAL w/ ACOUSTICAL RUBBER CAULKING @T/ PLATE TO DRYWALL THROUGHOUT CEILINGS, TYP.114" x 6" FIBER CEMENTWINDOW HEAD, TYP.
114" x 8" FIBER CEMENT FREIZEBOARD @ PARAPETS
114" x 6" FIBER CEMENT TRIM BAND58" TYPE "c" GYP. BD. ON RESILIENTCHANNELS @ 12" O.C., TYP.2'-2" TYP.
34" POURED UNDERLAYMENTON 2332" T&G DECKING W/SOUNDMAT UNDERLAYMENTIN UNITS @ ALL HARDSURFACE LOCATIONS
34" POURED UNDERLAYMENTON 2332" T&G DECKING W/SOUNDMAT UNDERLAYMENTIN UNITS @ ALL HARDSURFACE LOCATIONS
FIBER CEMENT 1x BOARDS TOWRAP PARAPET CORNICEFRAMING. CAULK EDGES ANDSEAMSTPO ROOFING MEMBRANE,EXTEND 8" UP WALL W/TERMINATION BAR
PREFINISHED PERFORMED SHEET METAL COPING FASTEDTO PLYWOOD SUBSTRATE AT THE TOP OF PARAPET WALLHEAT-WELDABLE L-SHAPEDDRIP EDGE WITH HEMMEDEDGE
114" x 4" FIBER CEMENT TRIM, TYP. FIBER CEMENT WINDOW SILL, TYP.
8"
2'-0" TYP.2'-0" TYP.
FIRST FLOOR FINISH FLOORELEV. = SEE CIVIL DWGS.
ELEV. = +10' - 858" SECOND FLOOR FINISH FLOOR
4" #57 GRAVEL BED BENEATH SLAB, TYP.
34" POURED UNDERLAYMENT ON 2332" T&G DECKING W/SOUNDMAT UNDELAYMENT IN UNITS @ ALL HARDSURFACE LOCATIONS
58" TYPE "x" GYP. BOARD @ ALL INTERIOR &EXTERIOR WALL ASSEMBLIES, TYP.
R-19 BATT INSUL. UNFACED FRICTION FIT, TYP. @ ALLEXTERIOR WALL ASSEMBLIES
2x6 P.T. PLATE W/ 12" GALV. ANCHOR BOLTS @36" O.C. W/ 7" EMBED MIN. IN CONC. TYP., @ ALLEXTERIOR WALLS U.N.O.CAPILLARY SEAL BTW. ALL P.T. B/ PLATES &FOUNDATIONS, TYP.
58" TYPE "c" GYP. BD. ON RESILIENT CHANNELS @16" O.C., TYP. THROUGHOUT 1st, 2nd, & 3rd FLOORCEILINGS
R-19 SOUND ATTENUATION FACED BATT INSUL. PINNEDTO UNDERNEATH OF DECKING TYP., @ ALL UNITS
4" CONC. SLAB W/ 6x6 W1.4xW1.4 WWM @112" FROM T/ SLAB
R-19 BATT INSUL. UNFACEDFRICTION FIT, TYP. @ ALLEXTERIOR BAND JOIST
1x6 FIBER CEMENT TRIMBOARD W/ 14" GAP BTW. FIBERCEMENT TRIM & MASONRYVENEER, TYP.
BRICK VENEER W/ 22 GA. 78" WIDE GALV. MTL. TIES @ 16"O.C. VERT. & 24" O.C. HORIZ.,TYP.PROVIDE WAFFLE WEEPHOLES @ 32" O.C. BYOMITTING VERT. MORTARJOINTSGRADE 8" MIN. BELOW FINISHFLOOR - SEE CIVIL DWGS.
18" PRE-ENGINEERED FLOOR TRUSSES, TYP. U.N.O.
MOISTURE BARRIER TYVEKOR EQUAL OVER 12" OX-ISBOARD INSULATEDSHEATHING, TYP. @ ALLEXTERIOR WALLS
(1) LAYER OF 10 MIL. POLY.VAPOR BARRIER (LAP & TAPEALL SEAMS & JOINTS)
114" x 4" FIBER CEMENT TRIM, TYP. FIBER CEMENT WINDOW SILL, TYP.
12 CONT. METAL FLASHING 34" DOWN FACE OF BRICK SOLDIER& EXTENDED 4" UP WALL W/BACKER ROD & SEALANTUNDER FLASHING EDGEPOLYETHYLENE CLOSED CELLFOAM @ WALL BASE &GYPCRETE @ ALL UNITS, TYP.BRICK SOLDIER COURSEPROJ. 12", TYP.
18" PRE-ENGINEERED FLOORTRUSSES, TYP. U.N.O. - SEESHEETS A4.6 - A4.14 FORORIENTATION & LOCATIONS.
58" TYPE "x" GYP. BOARD @ ALL INTERIOR &EXTERIOR WALL ASSEMBLIES, TYP.
MOISTURE BARRIER (TYVEK OREQUAL) OVER 12" OX-IS BOARDINSULATED SHEATHING, TYP. @ALL EXTERIOR WALLS. SEESHEET A4.1 FOR NAILINGSCHEDULE
R-19 SOUND ATTENUATIONFACED BATT INSUL. PINNEDTO UNDERNEATH OFDECKING TYP., @ ALL UNITS
1x6 FIBER CEMENT TRIM BOARDW/ 12" GAP BTW. FIBER CEMENTTRIM & MASONRY VENEER, TYP.
FINISH FLOOR F.F.ELEV. = VARIES
BRICK VENEER W/ 22 GA. 78" WIDE GALV. MTL. TIES @ 16"O.C. VERT. & 24" O.C. HORIZ.,TYP. (MAINTAIN 1" AIR SPACE @ALL BRICK LOCATIONS)14" GAP & SEAL W/ ACOUSTICALRUBBER CAULKING @ T/ PLATETO DRYWALL THROUGHOUTCEILINGS, TYP.
1/2"
PRE-FINISHED MTL. FLASHING W/ DRIPEDGE EXTENDED 6" UP WALL & TAPED TOTYVEK W/ BACKER ROD & CAULKED, TYP.
FIRST FLOOR F.F.ELEV. = SEE CIVIL
1/2"1/2"12 CONT. METAL FLASHING 34" DOWN FACE OF BRICK ROWLOCK& EXTENDED 4" UP WALL W/BACKER ROD & SEALANT UNDERFLASHING EDGEBRICK ROWLOCK COURSEW/ 1:2 SLOPE &PROJECTED 12", TYP.BRICK SOLDIER COURSEPROJ. 12", TYP.
MOISTURE BARRIER (TYVEK OREQUAL) OVER 12" OX-IS BOARDINSULATED SHEATHING, TYP. @ALL EXTERIOR WALLS.1x6 FIBER CEMENT TRIM BOARDW/ 12" GAP BTW. FIBER CEMENTTRIM & MASONRY VENEER, TYP.
BRICK VENEER W/ 22 GA. 78" WIDE GALV. MTL. TIES @ 16"O.C. VERT. & 24" O.C. HORIZ.,TYP. (MAINTAIN 1" AIR SPACE@ ALL BRICK LOCATIONS)
58" TYPE "x" GYP. BOARD @ ALL INTERIOR& EXTERIOR WALL ASSEMBLIES, TYP.PRE-FINISHED MTL. FLASHING W/ DRIPEDGE EXTENDED 6" UP WALL & TAPED TOTYVEK W/ BACKER ROD & CAULKED, TYP.
(4) 2x6 BLOCKINGHPT 372 PL EA. SIDE W/10 DHDG NAILS4X4 P.T.HPT 372 PL EA. SIDE W/ 10DHDG NAILS
2x6 P.T.(2) 2x6 BLOCKING4x4 P.T.
2122'-6"METAL ROOFING SYSTEMOVER 30 LB. ROOFING FELTON A.P.A. SPAN RATED 16/24DECKING 15/32" MIN.PLYWOOD OR O.S.B., TYP.
11-HOUR RATED EXTERIOR WALL SECTION @ PARAPET (UL U356)1/2" = 1'-0"
2018-0788-30-2023VJT WALL SECTION DETAILS2022 PRELIMINARY DRAWING SETEXTERIOR WALL SECTION DETAIL @ BRICK CAP TO BRICK VENEER (UL U356)1 1/2" = 1'-0"2
EXTERIOR WALL SECTION DETAIL @ BRICK SOLDIER COURSE TO TRIM BAND (UL U356)1 1/2" = 1'-0"3
EXTERIOR WALL SECTION DETAIL @ AWNING1 1/2" = 1'-0"4
A1.73
A1.73
A1.73
2018-0788-30-2023VJT MATERIAL SPECIFICATIONS2022 PRELIMINARY DRAWING SETBRICKMANUFACTURER: CHEROKEE BRICK & TILE COMPANYPRODUCT DESCRIPTION: M/S VELOUR RED, MODULAR W/MORTAR
LAP SIDING - 1MANUFACTURER: JAMES HARDIEPRODUCT DESCRIPTION: HARDIE PLANK LAP SIDINGTEXTURE: SMOOTH
TRIM BOARDSMANUFACTURER: JAMES HARDIEPRODUCT DESCRIPTION: 4/4, 5/4, HARDIE TRIM BOARDSTEXTURE: SMOOTHCOLOR: ARCTIC WHITE
PANEL BOARDSMANUFACTURER: JAMES HARDIEPRODUCT DESCRIPTION: HARDIE ARCHITECTURAL COLLECTION FINE SAND GROOVEDTEXTURE: SMOOTH
METAL ROOFMANUFACTURER: SMITH-BUILT METAL ROOFS & BUILDINGSPRODUCT DESCRIPTION: MASTER-RIB ROOF SYSTEMCOLOR: RUSTIC RED SR 32 SRI 33
DOORMANUFACTURER: WINDOORPRODUCT DESCRIPTION: CLEAR LOW -E 1464-1L, 2054-1L, 2264-1L
WINDOWMANUFACTURER: SILVERLINE WINDOWSPRODUCT DESCRIPTION: DOUBLE HUNG - V1 SERIESCOLOR: WHITE
EVENING SHADOW (SW7662)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #C9CCCDLOCATION: EXTERIOR LAP SIDINGWESTHIGHLAND WHITE (SW7566)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #F3EEE3LOCATION: EXTERIOR LAP SIDING
HONEY BLUSH (SW6660)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #F5CF9BLOCATION: EXTERIOR FIBER CEMENT PANEL
KILIM BEIGE (SW6106)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #D7C5AELOCATION: EXTERIOR FIBER CEMENT PANEL
LATTE (SW6108)MANUFACTURER: SHERWIN WILLIAMSHEX VALUE: #BAA185LOCATION: EXTERIOR FIBER CEMENT PANEL
EXTERIOR COLOR SPECS:
T/ FOURTH FLOOR FINISHELEV. = +32'-9"
T/ THIRD FLOOR FINISHELEV. = +21'-4 12"
T/ FIRST FLOOR FINISHELEV. = SEE CIVIL
T/ SECOND FLOOR FINISHELEV. = +10'-8 58"
B/ ROOF TRUSS BEARINGELEV. = +41'-9"T/ FOURTH FLOOR FINISHELEV. = +32'-9"
T/ THIRD FLOOR FINISHELEV. = +21'-4 12"
T/ FIRST FLOOR FINISHELEV. = SEE CIVIL
T/ SECOND FLOOR FINISHELEV. = +10'-8 58"
T/ FOURTH FLOOR FINISHELEV. = +32'-9"
T/ THIRD FLOOR FINISHELEV. = +21'-4 12"
T/ FIRST FLOOR FINISHELEV. = SEE CIVIL
T/ SECOND FLOOR FINISHELEV. = +10'-8 58"
B/ ROOF TRUSS BEARINGELEV. = +41'-9"T/ FOURTH FLOOR FINISHELEV. = +32'-9"
T/ THIRD FLOOR FINISHELEV. = +21'-4 12"
T/ FIRST FLOOR FINISHELEV. = SEE CIVIL
T/ SECOND FLOOR FINISHELEV. = +10'-8 58"
2018-0786-6-2023VJT BUILDING 100 - ELEVATIONS
7-24-2023
SCALE: 332" = 1'-0"05'-4"10'-8"21'-4" 1BUILDING 100 - SOUTH ELEVATION 3/32" = 1'-0" BLDG. 200 MIRROR IMAGE
2BUILDING 100 - WEST ELEVATION3/32" = 1'-0" BLDG. 200 MIRROR IMAGE
E
CB
G
B
G
C
BAARCHITECTURAL ANTI-FUNGAL FIBERGLASS SHINGLES (MIN. 30 YR) - COLOR GAF TIMBERLINE HDZ " PEWTER GRAY"HARDIE FIBER CEMENT PLANK LAP SIDING W/ 8" EXPOSURE - PAINTED SHERWIN WILLIAMS SW7566"WESTLANDHIGH WHITE" - FLAT FINISHC
E
HARDIE FIBER CEMENT PLANK LAP SIDING W/ 8" EXPOSURE - PAINTED SHERWIN WILLIAMS SW7662 "EVENINGSHADOW" - FLAT FINISHD4'x8' FIBER CEMENT PANELS - PAINTED SHERWIN WILLIAMS "LATTE" (INSTALL TYVEK DRAINVENT RAINSCREENBEHIND ALL FIBER CEMENT PANEL LOCATIONS, TYP.)4'x8' FIBER CEMENT PANELS - PAINTED SHERWIN WILLIAMS "HONEY BLUSH" (INSTALL TYVEK DRAINVENTRAINSCREEN BEHIND ALL FIBER CEMENT PANEL LOCATIONS, TYP.)4'x8' FIBER CEMENT PANELS - PAINTED SHERWIN WILLIAMS "KILIM BEIGE" (INSTALL TYVEK DRAINVENT RAINSCREENBEHIND ALL FIBER CEMENT PANEL LOCATIONS, TYP.)BRICK VENEER #1 - CHEROKEE BRICK - 'SAPELO'GF
PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE:
2018-0786-6-2023VJT BUILDING RENDER @ SOUTH-EAST SIDE
7-24-2023
PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE:
2018-0786-6-2023VJT BUILDING RENDER @ SOUTH-EAST SIDE (MAIN ENTRANCE)
7-24-2023
PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE:
2018-0786-6-2023VJT BUILDING RENDER @ EAST SIDE (SALEM ROAD)
7-24-2023
PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE:
2018-0786-6-2023VJT BUILDING RENDER @ NORTH-EAST SIDE
7-24-2023
PRIMARY FACADE IS THE EAST FACADE ALONG SALEM ROADNOTE:
2018-0786-6-2023VJT BUILDING RENDER @ SOUTH-EAST SIDE
7-24-2023
Page
Beaufort Senior Apartments
1
MARTIN RILEY ASSOCIATES - ARCHITECTS, P.C.
215 CHURCH ST. SUITE 200 DECATUR GEORGIA 30030-3329 404-373-2800
Response to comments (8-11-2023)
RE: Board Comments
Proposed Beaufort Senior Apartments, Beaufort, SC
1. Applicant to consider simplification of the east facades in terms of materiality as illustrated on sheet
A3.1.
a. See revised east façade elevations on sheets A3.1 & A3.5.
2. Applicant to restudy the material transitions at the corner as illustrated on sheet A3.4.
a. See revised building render on sheet A3.4.
3. Applicant to provide color samples and specs (full exterior material selections).
a. See sheet A1.8.
4. Applicant to provide necessary wall sections to understand material interactions and profiles (in addition
to staff’s comments, the board would like to understand the parapet conditions around the project).
a. See detail #1 & #2 on sheet A1.7.
5. On sheet A3.1, applicant to consider expanding the porch at the commercial leasing office to cover the
window (porch floor and roof).
a. See revised elevation #1 on sheet A3.1.
6. Applicant to come back to DRB with revisions.
a. See revised drawing set.
Source: City of Beaufort website. First collected Nov 20, 2026.