Natural Resources Committee — Agenda Packet
Beaufort County · Beaufort County · Natural Resources Committee · meeting of Nov 2, 2026 · Agenda packets
Open the original document More from Beaufort County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Natural Resources Committee Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
*3:00PM OR AT THE CONCLUSION OF THE COMMUNITY SERVICES COMMITTEE MEETING*
Monday, November 2, 2026
3:00 PM
AGENDA
COMMITTEE MEMBERS:
York Glover, Chair
Gerald Dawson
Anna Maria Tabernik
Lawrence McElynn, Vice-Chairman
Joseph Passiment
Alice Howard, Ex-Officio
1. CALL TO ORDER:
2. PLEDGE OF ALLEGIANCE:
3. STATEMENT OF COMPLIANCE WITH FOIA:
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES
● Minutes from October 5, 2026.
6. PUBLIC COMMENT PERIOD – 15 MINUTES TOTAL
7. AGENDA ITEMS
a. An Ordinance to Amend Ordinance 2026/16 authorizing the County Administrator to execute the
necessary documents to convey a parcel of real property TMS No. R100 033 00A 021B 000 to the
Habitat for Humanity of the Lowcountry for development of workforce/affordable housing and other
matters related thereto. (FISCAL IMPACT: None) - Dylan Kidd, ACA; Habitat representatives
b. An Ordinance authorizing Beaufort County Council to declare a temporary moratorium on the
acceptance, processing, approval, or issuance of certain applications, permits, and approvals for
data centers in Beaufort County, South Carolina; providing for a comprehensive study of the
potential cumulative impacts of data centers; invoking the pending ordinance doctrine; and
providing for other matters related thereto. (FISCAL IMPACT: ) - Rob Merchant
c. An Ordinance amending the zoning map for 502 acres located on Dulamo Road and St. Helenville
Road (R300 007 000 0002 0000; R300 012 000 0256 0000) for the removal from the Cultural
Protection Overlay (CPO) district. (FISCAL IMPACT: ) - Rob Merchant
8. ADJOURNMENT
Page 1 of 172
To watch committee or County Council meetings or for a complete list of agendas and backup packages,
please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html
Page 2 of 172
Natural Resources Committee Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, October 5, 2026
4:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the
complete meeting https://beaufortcountysc.new.swagit.com/videos/402899
1. Call to Order
Committee Chair Glover called the meeting to order at 4:00 PM
Present
Committee Chair York Glover
Committee Member Gerald Dawson
Committee Member Anna Maria Tabernik
Committee Member Joseph Passiment
Absent
Committee Vice-Chair Lawrence McElynn
Ex-Officio Alice Howard
Council Member David Bartholomew
Council Member Paula Brown
Council Member Logan Cunningham
Council Member Mark Lawson
Council Member Thomas Reitz
2. Pledge of Allegiance
Committee Chair Glover led the Pledge of Allegiance.
3. Statement of Compliance with FOIA
Committee Chair Glover stated that public notification of this meeting had been published, posted, and
distributed in compliance with SC FOIA.
4. Approval of Agenda
Motion: It was moved by Committee Member Passiment, seconded by Committee Member Tabernik to
approve the agenda.
The Vote - Voting Yea: Committee Chair Glover, Committee Member Dawson, Committee Member
Tabernik, and Committee Member Passiment. The motion passed 4:0.
5. Approval of Minutes
Page 3 of 172
Motion: It was moved by Committee Member Passiment, seconded by Committee Member Dawson to
approve the minutes from September 8, 2026.
The Vote - Voting Yea: Committee Chair Glover, Committee Member Dawson, Committee Member
Tabernik, and Committee Member Passiment. The motion passed 4:0.
6. Public Comment Period
No public comments were taken.
7. Assistant County Administrator Report
Dylan Kidd, Assistant County Administrator, gave updates on projects for the year and the
restructuring of the land preservation department. Please watch the video stream on the county's
website to view the full report. https://beaufortcountysc.new.swagit.com/videos/402899
8. Agenda Items
a. Consideration of a text amendment to the community development code (cdc): table a.13.40 (May
River Community Preservation District Land Use) to permit cemeteries as an allowed use (FISCAL
IMPACT: na) - Rob Merchant
Motion: It was moved by Committee Member Passiment, seconded by Committee Member Dawson to
approve the Consideration of a text amendment to the community development code for the following
reasons: it is consistent with the goals , objectives, and policies of the comprehensive plan; it is not in
conflict with any provisions of this development code or the code of ordinances; it is not required by
changed conditions; it does address a demonstrated community need; it is consistent with the purpose
and intent of the zones in this development code, or would improve compatibility among uses and
ensure efficient development within the county; it would result in a logical and orderly development
pattern; and it would not result in adverse impacts on the natural environment including but not limited to
water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of
the environment.
The Vote - Voting Yea: Committee Chair Glover, Committee Member Dawson, Committee Member
Tabernik, and Committee Member Passiment. The motion passed 4:0.
9. Adjournment
Ratified:
Page 4 of 172
Page 5 of 172
REQUEST FOR PUBLIC COMMENTS
#1 Beaufort County, SC Council
Date: H \ � 12�
; l
()
�II Name-Print:_ i rf [ f IV \ U\\ 0 (
� b� � \u District: ____________________ _
Topic: c_eo
Email Address: (if you would like someone to reach out to you)
I Gc1_ J l . •
� Beaufort County, SC Council
Date: I/-':)_- �D � 0
Name-Print: / 1 !'.kl J l>:;J.
District: Lqfk\ L Jee ;J
Topic: ( P ,
Email Address: (if you would like someone to reach out to you)
Th i r J Yb C:.-tL 1£..,'j_ Wkt' i /. Ct? M
Page 6 of 172
I
Date:
REQUEST FOR PUBLIC COMMENTS
B aufort County, SC Council
// 2_(?
Name-Pri t: � v{_ l a_
District: _,,,�"SI.-+-, '/,-I __,/ic-------=-+-/ �=..L.._O_.__c::...___ _______________
Topic: -l--p-'-; ...L__h_,________..._e_X __ ':,_,_--- ---"'--l_q.,=n�d.......,::.... __________ _
Email Address: (if you would like someone to reach out to you)
Signature: ____________________ _
/J.,#s REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: \\/�/U
Name-Print: ]-.tJSl{ \!JAlfz,,
District: ----1--------------------
Topic: _ __;fL..!.r..!.....!.n<-�ll..._4_tlV\_1..\---
1 --------------
Email Address: (if you would like someone to reach out to you)
Signature: -----P=�<:..!-----=-...:....J.�--+-,<lJ"=-,,-...,,,�t'--�-.....___ ________ _
Page 7 of 172
#6 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
ite: J.Nov 11,,
Name-Print: • s�11 nda Jones
District:--'-£_ ____________________ _
Topic:�"'----------------------
Email Address: (if you would like someone to reach out to you)
Signature: /�uU r
#7 REQUEST FOR PUBLIC COMMENTS
/.
Beaufort County, SC Council
ate: (( } 1. / �G
Name-Print:' #f/1 D /J l {312-,() vJII/
., ...
District: 3
Topic:_-_-(!_==P=6===-V-_-:5==={J.=l'=/\J==f==, ----=p=,=� ,=�=,::rv==�===========
Email Address: (if you would like someone to reach out to you)
Page 8 of 172
#8 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
,/ate, \I I 'l-{2-0Lk.
Name-Print: ___ fLD __ ()_-c..._c:('---'--_�_CY\_���--------
District: :) ---------------------
Topic: __ '"P_,_/\_R....._.__:L_·-s.---'--{ _a.t______;;_)�-------------
Email Address: (if you would like someone to reach out to you)
fZ-t:> 1 t "'--4 L f\ Q 8 M ..s � \)"" I\ () u." 1'-< (\_ · � t-"\
Signature: � -z_. J fd,--
#9 REQUEST FOR PUBLIC COMMENTS
/ . Beaufort County, SC Council
/oate: /l (-z_
1 /
Name-Print:_ She_{ / t<_( Gcv.; '{J �
District:_3_. _________ / __________ _
Topic: __ 0 __ P_0 ______________ _
Email Address: (if you would like someone to reach out to you)
Page 9 of 172
REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: ,r�;a-_('.;
1
Name-Pr1 ;-?cf, C � J&:121 #--cir
District: ----""--4-----------------------
Topic:---,,,e<---l,,<-L-C'(ll/=-i �12�1A���L--------
Email Address: (if you would like someone to reach out to you)
Signature: --=�¥<;6-'· �--==t2=-=;0�v__,..,!f'<'
i
",f',.
�
+-6-C-�----_-_-_-_________ _
#11
Date:
REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
-------
Name-Print: _____________________ _
District: ----------------------
Topic: ______________________ _
Email Address: (if you would like someone to reach out to you)
Signature: ____________________ _
Page 10 of 172
BEAUFORT COUNTY
NATURAL RESOURCES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE TO AMEND ORDINANCE 2026/16 AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE
THE NECESSARY DOCUMENTS TO CONVEY A PARCEL OF REAL PROPERTY TMS NO. R100 033 00A 021B 000 TO
THE HABITAT FOR HUMANITY OF THE LOWCOUNTRY FOR DEVELOPMENT OF WORKFORCE/AFFORDABLE
HOUSING AND OTHER MATTERS RELATED THERETO.
MEETING NAME AND DATE:
Natural Resources Committee November 2, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Forward to Council with favorable or unfavorable vote
PRESENTER INFORMATION:
Dylan Kidd, ACA; Habitat representatives
ITEM BACKGROUND:
Council adopted Ordinance 2026/16 on May 11, 2026, authorizing the County Administrator to donate the
subject property to Habitat for Humanity for the development of workforce/affordable housing. Contained
within the Ordinance and the accompanying documents were the County's standard covenants and
restrictions pertaining to the development of workforce/affordable housing for properties that the County
conveys. In June, Habitat's attorney contacted the County requesting changes to the covenants and
restrictions for the first time. The ordinance and accompanying documentation were included as agenda item
backup materials for committee and all three readings at Council, and Habitat's representative attended the
meetings and spoke multiple times. The proposed amended language removes the standard covenants and
restrictions and replaces them with the language contained in the ordinance to amend.
FISCAL IMPACT:
None
APPROVAL HISTORY:
Page 11 of 172
ORDINANCE 2026/
AN ORDINANCE AMENDING ORDINANCE 2026/16 AUTHORIZING THE COUNTY
ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS TO CONVEY A
PARCEL OF REAL PROPERTY TMS NO. R100 033 00A 021B 0000 TO THE HABITAT
FOR HUMANITY OF THE LOWCOUNTRY FOR DEVELOPMENT OF
WORKFORCE/AFFORDABLE HOUSING AND OTHER MATTERS RELATED
THERETO
WHEREAS, Beaufort County (“County”) recognizes that workforce and affordable
housing is a significant need throughout the County; and
WHEREAS, Habitat for Humanity of the Lowcountry (“Habitat”) seeks to increase
workforce and affordable housing for community members in Beaufort County; and
WHEREAS, the County has identified a parcel of real property, owned by the County,
TMS No. R100 033 00A 021B 0000, consisting of a .38-acre lot located on Palmetto Ridge
Street, hereinafter referred to as the “Property.” The Property is located within the general Shell
Point area of Beaufort County, in close proximity to employment opportunities, Parris Island,
and downtown Port Royal; and
WHEREAS, the County desires to support Habitat’s goals by conveying the Property to
Habitat for Ten and 00/100 ($10.00) Dollars for the purpose of developing workforce/affordable
housing for members of the community; and
WHEREAS, the conveyance will be subject to the following covenants and restrictions:
County will 1) ensure the conveyance of the Property is contingent on the issuance of the
necessary approvals and the residential dwelling units for the development of
workforce/affordable housing on the Property; 2) place contractual obligations on Habitat to
ensure that the residential housing constructed on the Property is dedicated to
workforce/affordable housing; 3) place contractual obligations on Habitat to ensure that
development of the Property occurs within three (3) years of the conveyance of the property; and
4) ensure the conveying deed for the Property shall include terms restricting the use of the
Property to the above-described workforce/affordable housing for a period of thirty (30) years;
and 5) ensure that if, at any time during the thirty-year period the Property ceases to be used for the
above-described workforce/affordable housing, the County shall have the options of (a)
purchasing the Property from the Property’s owner for an amount equal to the fair market value
of the improvements to the Property or (b) rescinding the covenants and restrictions affecting the
Property in exchange for an amount equal to the fair market value of the Property at that time less
the fair market value of the improvements thereon; and
1. Title to the real property conveyed hereunder, or such part of the property as Hilton Head
Regional Habitat for Humanity, Inc., which has not conveyed to a qualified purchaser of a
Hilton Head Regional Habitat for Humanity, Inc., developed house, shall revert to
Beaufort County, and Beaufort County may reenter the real property as of its former
estate, under the following circumstances:
a. Hilton Head Regional Habitat for Humanity, Inc. abandons its plan to develop any
or all of the property conveyed hereunder to Hilton Head Regional Habitat for
Humanity, Inc., developed affordable housing, or if Hilton Head Regional Habitat
for Humanity, Inc., contracts to sell or sells or conveys all or any part of the real
property conveyed hereunder to any person other than a qualified purchaser of the
Hilton Head Regional Habitat for Humanity, Inc. developed houses.
Page 12 of 172
2. In the event Hilton Head Regional Habitat for Humanity, Inc. fails to complete 1(a), Hilton
Head Regional Habitat for Humanity, Inc. agrees that it will execute a deed of conveyance
to Beaufort County for such part of the real property conveyed hereunder that has not been
conveyed to a qualified purchaser of a Hilton Head Regional Habitat for Humanity, Inc.
developed residence.
3. Upon the conveyance of the real property, or any portion thereof, to a qualified purchaser
of a Hilton Head Regional Habitat for Humanity, Inc., developed house, Hilton Head
Regional Habitat for Humanity, Inc. shall include a restriction in the deed of conveyance
that provides Hilton Head Regional Habitat for Humanity, Inc. a right of repurchase if the
qualified purchaser offers the real property for sale within five (5) years of the date of the
recording of the deed of conveyance to such qualified purchaser from Hilton Head
Regional Habitat for Humanity, Inc.
4. Any and all covenants, restrictions, conditions, limitations, easements, right of ways, or
other instruments that are of record with the Office of the Register of Deeds for Beaufort
County, South Carolina as they pertain to the Property being conveyed herein; and
WHEREAS, Beaufort County Council finds that it is in the best interest of the citizens
and residents of Beaufort County to convey the Property to Habitat to develop
workforce/affordable housing for community members.
NOW, THEREFORE, BE IT ORDAINED by Beaufort County Council, duly
assembled, authorizes the County Administrator to execute the necessary documents to convey the
real property TMS No. R100 033 00A 021B 0000, located on Palmetto Ridge Street for
development of workforce/affordable housing pursuant to the terms and conditions described
above.
DONE this ____ day of ___________ 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chair
ATTEST:
Sarah W. Brock, Clerk to Council
Page 13 of 172
Page 14 of 172
Page 15 of 172
Page 16 of 172
68375543 v2
(Please do not write above this line – Reserved for Register of Deeds Office)
Return to and Prepared by:
Howell Gibson and Hughes PA
Post Office Box 40
Beaufort, SC 29901-0040
STATE OF SOUTH CAROLINA )
) TITLE TO REAL ESTATE
COUNTY OF BEAUFORT )
WHEREAS, Beaufort County (“County”) recognizes that workforce and
affordable housing is a significant need throughout the County; and
WHEREAS, Hilton Head Regional Habitat for Humanity, Inc. (“Habitat”)
seeks to increase workforce and affordable housing for community members in
Beaufort County; and
WHEREAS, the County has identified a parcel of real property, owned
by the County, TMS No. R100 033 00A 021B 0000, consisting of a .38-acre lot
located on Palmetto Ridge Street, hereinafter referred to as the “Property.” The
Property is located within the general Shell Point area of Beaufort County, in
close proximity to employment opportunities, Parris Island, and downtown Port
Royal; and
WHEREAS, the County desires to support Habitat’s goals by conveying
the Property to Habitat for Ten and 00/100 ($10.00) Dollars for the purpose of
developing workforce/affordable housing for members of the community; and
WHEREAS, Beaufort County Council finds that it is in the best interest
of the citizens and residents of Beaufort County to convey the Property to
Habitat to develop workforce/affordable housing for community members.
WHEREAS, said conveyance shall be subject to those certain restrictions
and conditions, outlined in “Exhibit B” hereto, to ensure that the conveyance is
consistent with the goals of providing attainable workforce and affordable
housing for qualifying members of the community in the future years to come.
NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS:
Page 17 of 172
68375543 v2
THAT, BEAUFORT COUNTY, a political subdivision of the State of
South Carolina (“GRANTOR"), for and in consideration of the sum of TEN AND
NO/100 ($10.00) DOLLARS to it in hand paid at and before the sealing of these
presents HILTON HEAD REGIONAL HABITAT FOR HUMANITY, INC., with an
address of P.O. Box 2747 Bluffton, SC 29910 ("GRANTEE"), in the State
aforesaid, the receipt whereof is hereby acknowledged, have granted, bargained,
sold and released and by these presents do hereby grant, bargain, sell, and
release unto the said HILTON HEAD REGIONAL HABITAT FOR HUMANITY,
INC., its successors and assigns, forever in fee simple, the following described
real property, to-wit:
SEE ATTACHED PROPERTY DESCRIPTION AS EXHIBIT “A”
TOGETHER with all and singular the rights, members, hereditaments and
appurtenances to the said premises belonging to or in anywise incident or
appertaining.
TO HAVE AND TO HOLD, all and singular, the said premises before
mentioned unto HILTON HEAD REGIONAL HABITAT FOR HUMANITY, INC., its
successors and assigns forever.
And the said Grantor does hereby bind itself, and its successors and
assigns to warrant and forever defend all and singular the said premises unto the
said HILTON HEAD REGIONAL HABITAT FOR HUMANITY, INC., hereinabove
provided against it and its successors and assigns, and any person, persons or
entities whomsoever lawfully claiming or to claim the same, or any part thereof.
Page 18 of 172
68375543 v2
WITNESS our hand and seal this ____ day of ____________, 2026.
Signed, Sealed and Delivered
In the Presence of: Beaufort County
___________________________ ______________________(SEAL)
Michael R. Moore
Its: Administrator
___________________________
STATE OF SOUTH CAROLINA )
) ACKNOWLEDGMENT
COUNTY OF BEAUFORT )
I, _____________________ do hereby certify that Michael R. Moore,
authorized representative and County Administrator for Beaufort County, South
Carolina, personally appeared before me this day and acknowledged the due
execution of the foregoing instrument. I further certify and affirm that the
witnesses hereto are not parties to or beneficiaries of this transaction.
Witness my hand and official seal this ______ day of ______________, 2026.
__________________________________
Notary Public of South Carolina
My Commission Expires:
Page 19 of 172
68375543 v2
EXHIBIT "A"
Property Description
All that certain piece, parcel of lot of land with improvements thereon, if any,
situate, lying and being in Beaufort County, South Carolina and being shown and
designated as Lot 3, Block M, Shell Point Subdivision on a revised plat of Block K
and M prepared by Niels Christensen, RLS, dated March 30, 1974, and recorded
in Plat Book 25 at Page 61 at the Office of the Register of Deeds for Beaufort
County, South Carolina. For a more complete description of said Lot, reference
may be had to an individual plat prepared by the Beaufort County Engineering
Department, dated April 3, 1996, a copy of which is attached to that certain deed
from Ronald F. Dhom and Roxann C. Dhom to Beaufort County recorded in the
Office of the Register of Deeds for Beaufort County, South Carolina in Deed
Book 851 at Page 365.
DMP: R100 033 00A 021B 0000
This conveyance is subject to those restrictive covenants as set forth in Deed
Book 93 at Page 110 in the Office of the Register of Deeds for Beaufort County,
South Carolina.
This conveyance is further subject to that certain Drainage Easement from
Beaufort County to Beaufort County of record with the Beaufort County Office of
the Register of Deeds, dated December 27, 2016, and being recorded on
January 4, 2017 in Deed Book 3542 at Page 1486. For a more complete
description and location of said easement across the property being conveyed
herein, reference is made to said Easement of record and its “Exhibit A” attached
thereto, depicting a “Requested 30’ Drainage Easement”.
This conveyance is further subject to those covenants, conditions and restrictions
attached hereto as “Exhibit B”.
This being the same property conveyed to the Grantor herein by that certain
deed of Ronald F. Dohm and Roxann Dhom dated April 3, 1996 and being
recorded on April 17, 1996 in the Office of the Register of Deeds for Beaufort
County, South Carolina in Deed Book 851 at Page 365.
This deed was prepared by the law offices of Howell, Gibson and Hughes, PA,
Post Office Box 40, Beaufort, SC 29901-0040 without the benefit of a survey and
without title examination or certifications.
Page 20 of 172
68375543 v2
EXHIBIT “B”
COVENANTS, CONDITIONS AND RESTRICTIONS
THE CONVEYANCES OF TITLE TO THE REAL PROPERTIES DESCRIBED
HEREIN IN EXHIBIT “A” SHALL BE SUBJECT TO THE FOLLWING
COVENANTS, CONDITIONS, AND RESTRTIONS:
1. Title to the real property conveyed hereunder, or such part of the property
as Hilton Head Regional Habitat for Humanity, Inc., has not conveyed to a
qualified purchaser of a Hilton Head Regional Habitat for Humanity, Inc.,
developed house, shall revert to Beaufort County, and Beaufort County
may reenter the real property as of its former estate, under the following
circumstances:
a. Hilton Head Regional Habitat for Humanity, Inc. abandons its plan
to develop any or all of the property conveyed hereunder to Hilton
Head Regional Habitat for Humanity, Inc., developed affordable
housing, or if Hilton Head Regional Habitat for Humanity, Inc.,
contracts to sell or sells or conveys all or any part of the real
property conveyed hereunder to any person other than a qualified
purchaser of the Hilton Head Regional Habitat for Humanity, Inc.
developed houses.
2. In the event Hilton Head Regional Habitat for Humanity, Inc. fails to
complete 1(a), Hilton Head Regional Habitat for Humanity, Inc. agrees that
it will execute a deed of conveyance to Beaufort County for such part of
the real property conveyed hereunder that has not been conveyed to a
qualified purchaser of a Hilton Head Regional Habitat for Humanity, Inc.
developed residence.
3. Upon the conveyance of the real property, or any portion thereof, to a
qualified purchaser of a Hilton Head Regional Habitat for Humanity, Inc.,
developed house, Hilton Head Regional Habitat for Humanity, Inc. shall
include a restriction in the deed of conveyance that provides Hilton Head
Regional Habitat for Humanity, Inc. a right of repurchase if the qualified
purchaser offers the real property for sale within five (5) years of the date
of the recording of the deed of conveyance to such qualified purchaser
from Hilton Head Regional Habitat for Humanity, Inc.
4. Any and all covenants, restrictions, conditions, limitations, easements,
right of ways, or other instruments that are of record with the Office of the
Register of Deeds for Beaufort County, South Carolina as they pertain to
the Property being conveyed herein.
5. Title to the real property conveyed hereunder, or such part of the property as Hilton Head
Regional Habitat for Humanity, Inc., has not conveyed to a qualified purchaser of a
Hilton Head Regional Habitat for Humanity, Inc., developed house, shall revert to
Page 21 of 172
68375543 v2
Beaufort County, and Beaufort County may reenter the real property as of its former
estate, under the following circumstances:
a. Hilton Head Regional Habitat for Humanity, Inc. abandons its plan to develop
any or all of the property conveyed hereunder to Hilton Head Regional Habitat
for Humanity, Inc., developed affordable housing, or if Hilton Head Regional
Habitat for Humanity, Inc., contracts to sell or sells or conveys all or any part of
the real property conveyed hereunder to any person other than a qualified
purchaser of the Hilton Head Regional Habitat for Humanity, Inc. developed
houses.
6. In the event Hilton Head Regional Habitat for Humanity, Inc. fails to complete 1(a),
Hilton Head Regional Habitat for Humanity, Inc. agrees that it will execute a deed of
conveyance to Beaufort County for such part of the real property conveyed hereunder
that has not been conveyed to a qualified purchaser of a Hilton Head Regional Habitat for
Humanity, Inc. developed residence.
7. Upon the conveyance of the real property, or any portion thereof, to a qualified purchaser
of a Hilton Head Regional Habitat for Humanity, Inc., developed house, Hilton Head
Regional Habitat for Humanity, Inc. shall include a restriction in the deed of conveyance
that provides Hilton Head Regional Habitat for Humanity, Inc. a right of repurchase if the
qualified purchaser offers the real property for sale within five (5) years of the date of the
recording of the deed of conveyance to such qualified purchaser from Hilton Head
Regional Habitat for Humanity, Inc.
8. Any and all covenants, restrictions, conditions, limitations, easements, right of ways, or
other instruments that are of record with the Office of the Register of Deeds for Beaufort
County, South Carolina as they pertain to the Property being conveyed herein.
Page 22 of 172
1
PURCHASE AND SALE
AGREEMENT
THIS PURCHASE AND SALE AGREEMENT (this “Agreement ”) is made and entered
into by and between Habitat for Humanity of the Lowcountry (“Habitat ”) and Beaufort County
(the “County ”) intended to be effective the date last signed by the parties (the “Effective Date”).
W I T N E S S E T H:
WHEREAS , the County currently owns certain real property in the Town of Port Royal, South
Carolina more particularly described on Exhibit “A”, attached hereto and made a part hereof (the
“Property ”); and
WHEREAS, Beaufort County (“County”) recognizes that workforce and affordable housing is a
significant need throughout the County; and
WHEREAS, Habitat for Humanity of the Lowcountry (“Habitat”) seeks to increase workforce and
affordable housing for community members in Beaufort County; and
WHEREAS, the County has identified a parcel of real property, owned by the County, TMS No.
R100 033 00A 021B 0000, consisting of a .38-acre lot located on Palmetto Ridge Street, hereinafter referred
to as the “Property.” The Property is located within the general Shell Point area of Beaufort County, in
close proximity to employment opportunities, Parris Island, and downtown Port Royal; and
WHEREAS, the County desires to support Habitat’s goals by conveying the Property to Habitat
for Ten and 00/100 ($10.00) Dollars for the purpose of developing workforce/affordable housing for
members of the community; and
WHEREAS, the conveyance will be subject to the following covenants and restrictions:
County will 1) ensure the conveyance of the Property is contingent on the issuance of the necessary
approvals and the residential dwelling units for the development of workforce/affordable housing on the
Property; 2) place contractual obligations on Habitat to ensure that the residential housing constructed on
the Property is dedicated to workforce/affordable housing; 3) place contractual obligations on Habitat to
ensure that development of the Property occurs within three (3) years of the conveyance of the property;
and 4) ensure the conveying deed for the Property shall include terms restricting the use of the Property to
the above-described workforce/affordable housing for a period of thirty (30) years; and 5) ensure that if, at
any time during the thirty-year period the Property ceases to be used for the above-described
workforce/affordable housing, the County shall have the options of (a) purchasing the Property from the
Property’s owner for an amount equal to the fair market value of the improvements to the Property or (b)
rescinding the covenants and restrictions affecting the Property in exchange for an amount equal to the
fair market value of the Property at that time less the fair market value of the improvements thereon; and
1. Title to the real property conveyed hereunder, or such part of the property as Hilton Head Regional
Habitat for Humanity, Inc., which has not conveyed to a qualified purchaser of a Hilton Head
Regional Habitat for Humanity, Inc., developed house, shall revert to Beaufort County, and
Beaufort County may reenter the real property as of its former estate, under the following
circumstances:
a. Hilton Head Regional Habitat for Humanity, Inc. abandons its plan to develop any or all of
the property conveyed hereunder to Hilton Head Regional Habitat for Humanity, Inc.,
Page 23 of 172
2
developed affordable housing, or if Hilton Head Regional Habitat for Humanity, Inc.,
contracts to sell or sells or conveys all or any part of the real property conveyed hereunder
to any person other than a qualified purchaser of the Hilton Head Regional Habitat for
Humanity, Inc. developed houses.
2. In the event Hilton Head Regional Habitat for Humanity, Inc. fails to complete 1(a), Hilton Head
Regional Habitat for Humanity, Inc. agrees that it will execute a deed of conveyance to Beaufort
County for such part of the real property conveyed hereunder that has not been conveyed to a
qualified purchaser of a Hilton Head Regional Habitat for Humanity, Inc. developed residence.
3. Upon the conveyance of the real property, or any portion thereof, to a qualified purchaser of a
Hilton Head Regional Habitat for Humanity, Inc., developed house, Hilton Head Regional Habitat
for Humanity, Inc. shall include a restriction in the deed of conveyance that provides Hilton Head
Regional Habitat for Humanity, Inc. a right of repurchase if the qualified purchaser offers the real
property for sale within five (5) years of the date of the recording of the deed of conveyance to
such qualified purchaser from Hilton Head Regional Habitat for Humanity, Inc.
4. Any and all covenants, restrictions, conditions, limitations, easements, right of ways, or other
instruments that are of record with the Office of the Register of Deeds for Beaufort County, South
Carolina as they pertain to the Property being conveyed herein; and
WHEREAS, Beaufort County Council finds that it is in the best interest of the citizens and
residents of Beaufort County to convey the Property to Habitat to develop workforce/affordable housing for
community members.
WHEREAS, said conveyance shall be subject to those certain restrictions and conditions, outlined in
“Exhibit B” hereto, as well as any other declarations, restrictions and conditions pertaining to the subject
Property of record with the Beaufort County, South Carolina Office of the Register of Deeds.
NOW , THEREFORE , for and in consideration of the above-recited premises, the mutual
covenants and agreements hereinafter set forth, the sum of Ten and No/100 Dollars ($10.00) and other
good and valuable consideration, the receipt, adequacy and sufficiency of which are hereby
acknowledged, the parties hereto do hereby covenant and agree as follows:
1. DONATION / PRICE .
(a) Donation of Property . The County hereby agrees to donate to Habitat and Habitat
agrees to accept from the County, upon the terms and conditions hereinafter set forth,
the Property, which terms include, without limitation, all improvements, easements,
appurtenances, hereditaments and rights appurtenant thereto or otherwise arising in
connection therewith.
(b) Purchase Price. The Purchase Price for the Property is Ten and No/100 ($10.00)
Dollars.
Page 24 of 172
3
2. CLOSING DOCUMENTS .
(a) Deed to Be Delivered . Subject to performance by Habitat of its obligations under this
Agreement, the County agrees to execute and deliver to Habitat by limited warranty
deed conveying good and marketable fee simple title to the Property, subject only to
those exceptions acceptable to Habitat and set forth in the title commitment referenced
in Paragraph 4 of this Agreement.
(b) Other Documents . At Closing, the County shall also execute and deliver all other
documents contemplated by this Agreement, including but not necessarily limited to
an absolute and general assignment of other rights, approvals, entitlements, warranties,
etc. relating to the Property.
3. CLOSING DATE . The Closing of the transaction contemplated by this Agreement shall occur
on or before fifteen (15) days after the Inspection Period as hereinafter defined (the “Closing ”
or “Closing Date”). The parties may also decide to conduct Closing remotely.
Notwithstanding the foregoing, Habitat reserves the right to close on the Property early upon
ten (10) days prior written notice to the County.
4. TITLE . Habitat may obtain within the Inspection Period, as hereinafter defined, at Habitat’s
sole cost and expense, a title examination and survey (the “Survey ”) of the Property and a title
insurance commitment covering the Property (the “Title Commitment ”). Habitat agrees to
notify the County in writing of any matters which Habitat may have as to any matters reflected
in the Title Commitment or Survey no later than ten (10) business days prior to the expiration
of the Inspection Period. If an owner’s title commitment can be issued by an ALTA insurance
company without any unusual exceptions, this shall constitute marketable title. The County
may, but shall not be obligated, to cure any matter objected to by Habitat pursuant to this
Paragraph 4, and the County shall respond to Habitat’s objections no later than five (5)
business days prior to the end of the Inspection Period. If such objections are not cleared by
the County, then Habitat shall have the right to terminate the Agreement. Habitat’s right to
examine title and notify the County of Habitat’s title objections shall extend until the
completion of the Inspection Period.
5. INSPECTION PERIOD / CONTINGENCIES .
(a) Habitat or its agents shall have the privilege at any time during the thirty (30) days
from the Effective Date (the “Inspection Period ”), of going upon the Property to
inspect the overall condition of the Property, obtain environmental reports, examine,
survey, and any other tests which Habitat may deem necessary, at Habitat’s expense.
No destructive testing shall be done unless approved in writing in advance by County.
Habitat agrees to indemnify and hold County harmless for any damages, and any injury
to persons occurring on the Property as a result of Habitat’s exercise of such inspection
rights. Habitat shall at Habitat’s expense, restore the Property to its former condition
in the event Habitat does not acquire the Property. Habitat agrees to indemnify and
hold the County harmless for any damages, and any injury or death to persons
occurring on the Property as a result of Habitat’s exercise of such inspection rights.
The County shall allow Habitat to inspect the Property without the County present.
Page 25 of 172
4
(b) Habitat will indemnify and hold harmless County from any and all loss, liability, costs,
claims, demands, damages, actions, causes of actions and suits arising out of, or in any
manner related to, the exercise by Habitat of Habitat’s rights under this Paragraph 5
and from and against any mechanic’s liens or claims of lien resulting therefrom, except
for any losses, liabilities, costs, claims, demands, damages actions, causes of action
and/or suits arising out of or in any manner related to the actions or inactions of County
and/or County’s agents, employees, contractors, tenants, officers, directors, members
and/or managers. This indemnification shall survive Closing or termination of this
Agreement until midnight of the date on which the appropriate statute of limitations
period expires.
(c) Promptly upon execution of this Agreement and in any event no later than five (5) days
from the Effective Date, County shall provide to Habitat without warranty of any kind
legible copies of any and all leases, surveys, plans, reports, existing deeds, title
insurance policies, environmental reports, wetland survey or determination letter,
property assessments and other similar non-proprietary and non-confidential
documents or reports concerning the Property in County’s possession or control
(collectively “County’s Deliveries ”).
(d) Habitat may terminate this Agreement, in its sole discretion, for any reason, at any
time during the Inspection Period by delivering written notice of such termination to
County. In the event of such termination, no party hereto shall have any further rights,
liabilities or obligations hereunder.
6. POSSESSION . Subject to Habitat’s compliance with its undertakings and agreements as set
out in this Agreement, County agrees to deliver possession of the Property to Habitat at
Closing. County shall retain all risk of loss, and shall maintain all insurance coverage, with
respect to the Property until midnight on the Closing Date.
7. ADJUSTMENTS AND PRORATIONS . All taxes, including, without limitation, real estate
taxes and personal property taxes, if any, charges for utilities, including water and sewer, and
for any utility services and all other operating costs and expenses and all other income, costs
and charges of every kind, which in any manner relate to the operation of the Property shall be
prorated as of midnight on the Closing Date. County shall assist Habitat with the collection of
this information. The parties shall execute and deliver a tax proration agreement at Closing to
address any taxes, assessments or other sums not due and payable at Closing.
8. CLOSING COSTS . County agrees to pay, in connection with the transfer of the Property,
their attorney’s fees and the South Carolina statutory recording fee (formerly documentary
stamps). Habitat agrees to pay its own attorney’s fees, local municipal transfer fees (if any),
and all title examination and title insurance costs and closing, settlement and escrow fees to
the Escrow Agent. County agrees to execute such normal and customary affidavits required
by the title company to allow standard title exceptions to be deleted.
9. BROKERAGE . County and Habitat warrant and represent that they have dealt with no
brokers or finders in connection with this transaction. Each party shall indemnify and save the
other party harmless from and against all costs, claims, expenses or damages, including
reasonable attorneys’ fees, resulting from or related to any brokerage commission due or
alleged to be due by such parties’ acts or omissions. This obligation to indemnify shall survive
the expiration, consummation or earlier termination of this Agreement until midnight of the
Page 26 of 172
5
date on which the appropriate statute of limitations period expires.
10. SURVIVAL . Subject to the time and liability limitations expressly set forth otherwise
elsewhere in this Agreement, all indemnities, warranties, representations and covenants made
by County or Habitat in this Agreement and in any document, instrument or certificate
executed and delivered pursuant hereto or in connection herewith shall terminate at Closing.
The provisions of this Paragraph 10 need not be restated in any document or agreement made
or delivered at Closing; provided, however, that at Habitat’s request, County will execute at
Closing a certification to Habitat that, as of the time of Closing, all representations and
covenants made by the County are true and correct to the best of County’s knowledge.
11. COVENANTS OF COUNTY . In addition to the covenants, agreements and obligations of
County contained elsewhere in this Agreement, County hereby agrees with and covenant to
Habitat as follows:
(a) Violations, Etc. County shall give prompt written notice to Habitat of (a) any notice or
allegation of violation of any laws, ordinances, rules or regulations with respect to the
Property, (b) any suit, judgment or other proceeding filed, entered or threatened with
respect to the Property or County’s use or ownership thereof, and (c) any actual or
contemplated changes in the zoning of the Property or any other requirements which
would materially adversely affect the use, ownership, maintenance or leasing of the
Property.
(b) Action . County shall not take or permit any action which would render untrue or
incorrect any of the warranties and representations made by County herein.
12. CASUALTY. If the Property, or any part thereof, should suffer material damage prior to Closing
from fire or other casualty, then Habitat may either (a) terminate this Agreement, whereupon
neither party shall have further rights or obligations pursuant to this Agreement, except with respect
to those matters which by their terms survive termination of this Agreement; or (b) consummate
the Closing whereupon the award of the insurance proceeds shall be assigned to Habitat , with no
reduction, offset, or abatement to the Purchase Price.
13. CONDEMNATION. If, prior to Closing, action is initiated or overtly threatened to take all or any
portion of the Property, Habitat may either (a) terminate this Agreement, whereupon neither party
shall have further rights or obligations pursuant to this Agreement, except with respect to those
matters which by their terms survive termination of this Agreement; or (b) consummate the Closing,
whereupon the award of the condemning authority shall be assigned to Habitat at Closing, with no
reduction, offset, or abatement in the Purchase Price.
14. ASSIGNMENT. Neither party may assign this Agreement with the consent of the other party in
writing. In the event of such assignation, assignee assumes and agrees to pay and/or perform all
obligations and liabilities under this Agreement, and that such assignee shall each remain jointly
and severally liable for all of the assigning party’s performance, obligations, and liabilities under
this Agreement.
15. NOTICES . Except as may otherwise be provided for in this Agreement, all notices or demands
required or permitted hereunder shall be delivered by electronic delivery, Federal Express,
UPS, or similar overnight delivery service prepaid to the following addresses for the parties:
Page 27 of 172
6
If to County: Beaufort County
Attn: Brian Hulbert
PO Box 1228
Beaufort, SC 29901
E-mail: brian.hulbert@bcgov.net
with copy to: Howell, Gibson & Hughes, P.A.
Attn: Thomas A. Bendle, Jr., Esquire
25 Rue Du Bois
Beaufort, SC 29907
TBendle@hghpa.com
If to Habitat: Habitat for Humanity of the Lowcountry
_________________________
_________________________
_________________________
_________________________
with a copy to: _________________________
_________________________
_________________________
_________________________
_________________________
All notices required or permitted under this Agreement shall be deemed to have been given
when actually delivered to the offices of the receiving party at the addresses above stated.
16. MISCELLANEOUS .
(a) Governing Law. This Agreement is made and entered into as a contract for the
purchase and sale of real property to be interpreted under and governed and enforced
according to the laws of the State of South Carolina.
(b) Terminology; Captions . The term “Agreement,” as used herein, as well as the terms
“herein,” “hereof,” “hereunder” and the like mean this Agreement in its entirety and
all exhibits attached hereto and made a part hereof. The captions and paragraph
headings hereof are for reference and convenience only and do not enter into or become
a part of the context. All pronouns, singular or plural, masculine, feminine or neuter,
shall mean and include the person, entity, firm or corporation to which they relate as
the context may require. Wherever the context may require, the singular shall mean
and include the plural and the plural shall mean and include the singular.
(c) Default .
(i) Upon the failure of Habitat to comply with the terms hereof within the
stipulated time, and after receipt of notice of said default with a ten (10) day
right to cure, it is understood and agreed by and between the parties hereto that
County may terminate this Agreement.
Page 28 of 172
7
(ii) Upon the failure of County to comply with the terms hereof within the
stipulated time and after receipt of notice of said default with a ten (10) day
right to cure, it is understood and agreed by and between the parties hereto that
Habitat may cancel the Agreement. In the event the Closing does not occur in
accordance with the terms of this Agreement because of the inability of the
County to convey good and marketable fee simple title to the Property because
of title defects or objections, Habitat’s sole right and exclusive remedy shall
be either to (a) terminate this Agreement r (b) waive such inability and proceed
to close the transaction without regard thereto.
(d) Binding Effect. The terms, covenants and conditions of this Agreement shall be
binding upon and shall inure to the benefit of Habitat and County and their respective
successors, permitted assigns, heirs and legal representatives. Habitat shall have the
right to assign this Agreement to an affiliate entity upon written notice to County prior
to Closing, but shall remain responsible for Habitat’s obligations hereunder up to and
including the Closing Date.
(e) Modification . This Agreement may not be modified, altered or amended except by a
written instrument executed by Habitat and County.
(f) Entire Agreement . This Agreement constitutes the entire and complete agreement of
Habitat and County with respect to the transaction contemplated hereby, and
conversations, undertakings, representations, promises, inducements, warranties or
statements not reduced to writing and expressly set forth herein shall be of no force or
effect whatsoever. The invalidity or unenforceability of any one provision herein shall
not affect the validity or enforceability of any other provision.
(g) Dates. If the final date of any time period or the date for the performance of any
obligation hereunder falls upon a Saturday, Sunday, or a bank holiday under the laws
of the State of South Carolina, then the time of such period or the time for the
performance of such obligation shall be extended to the next day which is not a
Saturday, Sunday, or bank holiday under the laws of the State of South Carolina.
(h) Counterparts . This Agreement may be executed in counterparts, each of which shall
be deemed to be an original. Each party may be entitled to rely upon a facsimile or an
electronic version of this Agreement, either of which shall be deemed to be sufficient.
IN WITNESS WHEREOF , the parties hereto have caused this Agreement to be executed by their
duly authorized officers as of the date referenced below.
COUNTY:
Beaufort County
By:
Its:
Page 29 of 172
8
Date:__________________________
HABITAT:
Habitat for Humanity of the Lowcountry
By:
Its:
Date:__________________________
Page 30 of 172
9
Exhibit “A”
Legal Description
All that certain piece, parcel of lot of land with improvements thereon, if any, situate, lying and being in
Beaufort County, South Carolina and being shown and designated as Lot 3, Block M, Shell Point Subdivision
on a revised plat of Block K and M prepared by Niels Christensen, RLS, dated March 30, 1974, and recorded
in Plat Book 25 at Page 61 at the Office of the Register of Deeds for Beaufort County, South Carolina. For a
more complete description of said Lot, reference may be had to an individual plat prepared by the Beaufort
County Engineering Department, dated April 3, 1996, a copy of which is attached to that certain deed from
Ronald F. Dhom and Roxann C. Dhom to Beaufort County recorded in the Office of the Register of Deeds
for Beaufort County, South Carolina in Deed Book 851 at Page 365.
DMP: R100 033 00A 021B 0000
This conveyance is subject to those restrictive covenants as set forth in Deed Book 93 at Page 110 in the
Office of the Register of Deeds for Beaufort County, South Carolina.
This conveyance is further subject to that certain Drainage Easement from Beaufort County to Beaufort
County of record with the Beaufort County Office of the Register of Deeds, dated December 27, 2016, and
being recorded on January 4, 2017 in Deed Book 3542 at Page 1486. For a more complete description and
location of said easement across the property being conveyed herein, reference is made to said Easement of
record and its “Exhibit A” attached thereto, depicting a “Requested 30’ Drainage Easement”.
This conveyance is further subject to those covenants, conditions and restrictions attached hereto as “Exhibit
B”.
This being the same property conveyed to the Grantor herein by that certain deed of Ronald F. Dohm and
Roxann Dhom dated April 3, 1996 and being recorded on April 17, 1996 in the Office of the Register of Deeds
for Beaufort County, South Carolina in Deed Book 851 at Page 365.
Page 31 of 172
10
EXHIBIT “B”
COVENANTS, CONDITIONS AND RESTRICTIONS
THE CONVEYANCES OF TITLE TO THE REAL PROPERTIES DESCRIBED HEREIN IN EXHIBIT “A”
SHALL BE SUBJECT TO THE FOLLWING COVENANTS, CONDITIONS, AND RESTRTIONS:
1. Title to the real property conveyed hereunder, or such part of the property as Hilton
Head Regional Habitat for Humanity, Inc., has not conveyed to a qualified purchaser
of a Hilton Head Regional Habitat for Humanity, Inc., developed house, shall revert
to Beaufort County, and Beaufort County may reenter the real property as of its
former estate, under the following circumstances:
a. Hilton Head Regional Habitat for Humanity, Inc. abandons its plan to develop
any or all of the property conveyed hereunder to Hilton Head Regional Habitat
for Humanity, Inc., developed affordable housing, or if Hilton Head Regional
Habitat for Humanity, Inc., contracts to sell or sells or conveys all or any part
of the real property conveyed hereunder to any person other than a qualified
purchaser of the Hilton Head Regional Habitat for Humanity, Inc. developed
houses.
2. In the event Hilton Head Regional Habitat for Humanity, Inc. fails to complete 1(a),
Hilton Head Regional Habitat for Humanity, Inc. agrees that it will execute a deed of
conveyance to Beaufort County for such part of the real property conveyed
hereunder that has not been conveyed to a qualified purchaser of a Hilton Head
Regional Habitat for Humanity, Inc. developed residence.
3. Upon the conveyance of the real property, or any portion thereof, to a qualified
purchaser of a Hilton Head Regional Habitat for Humanity, Inc., developed house,
Hilton Head Regional Habitat for Humanity, Inc. shall include a restriction in the deed
of conveyance that provides Hilton Head Regional Habitat for Humanity, Inc. a right
of repurchase if the qualified purchaser offers the real property for sale within five (5)
years of the date of the recording of the deed of conveyance to such qualified
purchaser from Hilton Head Regional Habitat for Humanity, Inc.
4. Any and all covenants, restrictions, conditions, limitations, easements, right of ways,
or other instruments that are of record with the Office of the Register of Deeds for
Beaufort County, South Carolina as they pertain to the Property being conveyed
herein.
1. Title to the real property conveyed hereunder, or such part of the property as Hilton Head Regional
Habitat for Humanity, Inc., has not conveyed to a qualified purchaser of a Hilton Head Regional
Habitat for Humanity, Inc., developed house, shall revert to Beaufort County, and Beaufort County
may reenter the real property as of its former estate, under the following circumstances:
a. Hilton Head Regional Habitat for Humanity, Inc. abandons its plan to develop any or all of
the property conveyed hereunder to Hilton Head Regional Habitat for Humanity, Inc.,
developed affordable housing, or if Hilton Head Regional Habitat for Humanity, Inc.,
Page 32 of 172
11
contracts to sell or sells or conveys all or any part of the real property conveyed hereunder to
any person other than a qualified purchaser of the Hilton Head Regional Habitat for
Humanity, Inc. developed houses.
2. In the event Hilton Head Regional Habitat for Humanity, Inc. fails to complete 1(a), Hilton Head
Regional Habitat for Humanity, Inc. agrees that it will execute a deed of conveyance to Beaufort
County for such part of the real property conveyed hereunder that has not been conveyed to a qualified
purchaser of a Hilton Head Regional Habitat for Humanity, Inc. developed residence.
3. Upon the conveyance of the real property, or any portion thereof, to a qualified purchaser of a Hilton
Head Regional Habitat for Humanity, Inc., developed house, Hilton Head Regional Habitat for
Humanity, Inc. shall include a restriction in the deed of conveyance that provides Hilton Head
Regional Habitat for Humanity, Inc. a right of repurchase if the qualified purchaser offers the real
property for sale within five (5) years of the date of the recording of the deed of conveyance to such
qualified purchaser from Hilton Head Regional Habitat for Humanity, Inc.
4. Any and all covenants, restrictions, conditions, limitations, easements, right of ways, or other
instruments that are of record with the Office of the Register of Deeds for Beaufort County, South
Carolina as they pertain to the Property being conveyed herein.
Page 33 of 172
BEAUFORT COUNTY
NATURAL RESOURCES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE AUTHORIZING BEAUFORT COUNTY COUNCIL TO DECLARE A TEMPORARY MORATORIUM ON
THE ACCEPTANCE, PROCESSING, APPROVAL, OR ISSUANCE OF CERTAIN APPLICATIONS, PERMITS, AND
APPROVALS FOR DATA CENTERS IN BEAUFORT COUNTY, SOUTH CAROLINA; PROVIDING FOR A
COMPREHENSIVE STUDY OF THE POTENTIAL CUMULATIVE IMPACTS OF DATA CENTERS; INVOKING THE
PENDING ORDINANCE DOCTRINE; AND PROVIDING FOR OTHER MATTERS RELATED THERETO.
MEETING NAME AND DATE:
Natural Resources Committee November 2, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of the proposed moratorium ordinance for data centers.
PRESENTER INFORMATION:
Rob Merchant
ITEM BACKGROUND:
The Natural Resources Committee of County Council directed staff to examine how Beaufort County can
better prepare for the possibility of a data center locating in the County. As an initial step, staff has prepared a
proposed moratorium ordinance. The proposed ordinance would temporarily suspend the development of
data centers in Beaufort County for nine months while the County studies whether its zoning regulations,
comprehensive plan, or other ordinances should be revised.
FISCAL IMPACT:
APPROVAL HISTORY:
At their October 5th meeting, the Planning Commission voted 6-1 to recommend approval of the ordinance
with the condition that the time suspending the development of data centers be increased from 9 to 12
months.
Page 34 of 172
Page 1 of 2
TO: York Glover, Chair, Natural Resources Committee of County Council
FROM: Robert Merchant, AICP, Beaufort County Planning and Zoning Department
DATE: October 14, 2025
SUBJECT: CONSIDERATION OF AN ORDINANCE AUTHORIZING BEAUFORT COUNTY COUNCIL TO
DECLARE A TEMPORARY MORATORIUM ON THE ACCEPTANCE, PROCESSING, APPROVAL,
OR ISSUANCE OF CERTAIN APPLICATIONS, PERMITS, AND APPROVALS FOR DATA
CENTERS IN BEAUFORT COUNTY, SOUTH CAROLINA; PROVIDING FOR A
COMPREHENSIVE STUDY OF THE POTENTIAL CUMULATIVE IMPACTS OF DATA CENTERS;
INVOKING THE PENDING ORDINANCE DOCTRINE; AND PROVIDING FOR OTHER MATTERS
RELATED THERETO
Background: The Natural Resources Committee of County Council directed staff to examine how
Beaufort County can better prepare for the possibility of a data center locating in the County.
Data centers are becoming increasingly common across South Carolina and the nation. Depending on
their size, they may affect the electric grid, water resources, the environment, noise levels, traffic,
emergency services, land values, housing availability, public infrastructure, and overall quality of life.
As an initial step, staff has prepared a proposed moratorium ordinance. Staff requested that the
Planning Commission review the ordinance and recommend whether County Council should proceed
with its adoption.
A moratorium is a temporary suspension of certain development activities. It generally pauses the
processing of development applications and the issuance of building permits while the local government
studies whether its zoning regulations, comprehensive plan, or other ordinances should be revised.
The proposed ordinance would temporarily suspend the development of data centers in Beaufort
County for nine months. This period would allow the County to:
• Research the potential impacts of data centers;
• Evaluate and, if appropriate, revise the County’s zoning regulations and related ordinances;
• Seek public input; and
• Address community concerns before data center development occurs.
MEMORANDUM
Page 35 of 172
Page 2 of 2
Staff Recommendation: Staff recommends that the County Council approve the proposed moratorium
ordinance for data centers.
Potential Next Steps: The purpose of the moratorium is to give the County time to study data centers
and determine whether additional regulations are needed to protect the County from potential adverse
impacts. Following that review, the County could consider one of the following options:
• Prohibit data centers: The County could prohibit data centers entirely within its jurisdiction.
• Adopt regulations for data centers: The County could establish regulations governing where
data centers may be located and the conditions under which they may operate. These
regulations could address potential impacts such as utilities, water use, noise, traffic, emergency
services, environmental protection, and infrastructure. Public input could be incorporated
through a special use approval process or a floating zoning district.
• Take no action: The County could determine that the existing Community Development Code
provides sufficient protections to address the potential impacts of data centers.
Staff has provided two sample ordinances for review to illustrate the range and complexity of issues the
County may need to address during the moratorium period. One sample ordinance would prohibit data
centers entirely. The other would establish a data center “floating zone.” A floating zone is a zoning
district that is not assigned to a specific location on the zoning map when it is created. The district would
be added to the official zoning map only if and when County Council approves its application to a
particular area of the County.
PLANNING COMMISSION RECOMMENDATION: At their October 5th meeting, the Planning Commission
voted 6-1 to recommend approval of the ordinance with the condition that the time suspending the
development of data centers be increased from 9 to 12 months.
Page 36 of 172
STATE OF SOUTH CAROLINA
COUNTY OF BEAUFORT
ORDINANCE NO. ________
AN ORDINANCE AUTHORIZING BEAUFORT COUNTY COUNCIL TO DECLARE A
TEMPORARY MORATORIUM ON THE ACCEPTANCE, PROCESSING, APPROVAL, OR
ISSUANCE OF CERTAIN APPLICATIONS, PERMITS, AND APPROVALS FOR DATA
CENTERS IN BEAUFORT COUNTY, SOUTH CAROLINA; PROVIDING FOR A
COMPREHENSIVE STUDY OF THE POTENTIAL CUMULATIVE IMPACTS OF DATA
CENTERS; INVOKING THE PENDING ORDINANCE DOCTRINE; AND PROVIDING FOR
OTHER MATTERS RELATED THERETO
WHEREAS, Beaufort County is a coastal community with distinctive natural, cultural, historic,
agricultural, and rural resources that contribute substantially to the County’s quality of life, economic
vitality, and sense of place; and
WHEREAS, Beaufort County Council has observed an increase in the number of data centers
seeking sites in the State of South Carolina; and
WHEREAS, Data centers may involve substantial buildings, extensive electrical infrastructure,
backup-generation equipment, cooling systems, water use, access roads, utility improvements, security
facilities, and other supporting infrastructure; and
WHEREAS, The development and operation of large-scale data centers may affect electric-grid
capacity, water supply, wastewater systems, stormwater management, air quality, noise levels, traffic,
emergency services, land values, housing availability, public infrastructure, environmental resources, and
the overall quality of life of Beaufort County residents; and
WHEREAS, The potential cumulative impacts of data centers may extend beyond the boundaries
of an individual parcel and may not be adequately evaluated through the review of a single zoning,
subdivision, land-development, or building-permit application; and
WHEREAS, Beaufort County’s 2040 Comprehensive Plan, adopted by County Council on
November 8, 2021, recognizes the importance of protecting the County’s natural, cultural, historic,
agricultural, and rural resources while directing growth in a manner that supports the health, safety,
welfare, and quality of life of current and future residents; and
WHEREAS, The 2040 Comprehensive Plan identifies the protection of rural lands,
environmentally sensitive areas, water resources, community character, infrastructure capacity, and
culturally significant places as important considerations in the County’s land use and development
decisions; and
WHEREAS, Beaufort County Council finds that the County should evaluate whether its existing
comprehensive plan, the Community Development Code, building codes, infrastructure policies, and
other ordinances provide an adequate framework for reviewing and managing the location, scale, design,
construction, operation, and potential cumulative impacts of data centers; and
Page 37 of 172
WHEREAS, Beaufort County Council further finds that a temporary, time-limited moratorium is
a reasonable planning measure that will allow the County to study these issues and determine whether
amendments to the County’s regulatory framework are appropriate or necessary; and
WHEREAS, The purpose of this Ordinance is not to prohibit data centers permanently, but to
provide a limited period for careful planning, public review, technical analysis, and consideration of
appropriate regulatory standards consistent with the Beaufort County 2040 Comprehensive Plan and the
protection of the County’s quality of life; and
WHEREAS, A temporary moratorium authorized and implemented in accordance with this
Ordinance is intended to protect the public health, safety, and general welfare while the County
undertakes the study described herein.
WHEREAS, Beaufort County Council desires that this temporary, time-limited moratorium take
effect immediately and therefore invokes the Pending Ordinance Doctrine.
NOW, THEREFORE, BE IT ORDAINED by Beaufort County Council, in a duly assembled
and noticed meeting this ____ day of ____________, 2026, as follows:
A. Findings Incorporated. Each “Whereas” clause above is adopted, confirmed, and incorporated
as a finding of Beaufort County Council.
B. Purpose and Intent. The purpose and intent of this Ordinance is to:
a. Allow Beaufort County to evaluate the potential direct and cumulative impacts of data
centers;
b. Determine whether the County’s current regulatory framework is adequate to address
those impacts;
c. Evaluate whether data centers are compatible with the Beaufort County 2040
Comprehensive Plan;
d. Protect the County’s natural resources, water supply, electric infrastructure,
transportation network, public services, community character, and quality of life; and
e. Provide an opportunity for public participation and informed consideration of any future
amendments to the County’s comprehensive plan, Community Development Code, or
other applicable requirements.
C. Definition. For purposes of this Ordinance, “Data Center” means a facility, campus of facilities,
or group of interconnected facilities that houses computer servers or other information-
technology equipment and is designed or used for the storage, processing, management,
transmission, or distribution of digital data.
A Data Center may include, without limitation, associated electrical substations, transformers,
switchyards, backup generators, fuel storage, cooling systems, water-treatment or water-storage
systems, telecommunications equipment, security facilities, administrative space, parking areas,
access roads, and other accessory or supporting infrastructure.
The term does not include:
Page 38 of 172
a. Ordinary computer rooms, server rooms, or information-technology equipment that is
accessory to and located within a separately permitted principal use;
b. Telecommunications facilities regulated under applicable federal or state law, except to
the extent that the facility constitutes a Data Center as defined above;
c. Public safety, emergency management, or governmental communications facilities that
are not operated as a commercial Data Center; or
d. Facilities that the County determines, in writing, do not meet the scale, intensity, or
operational characteristics of a Data Center as defined in this Section.
D. Temporary Moratorium. Beaufort County Council hereby declares a temporary moratorium on
the acceptance, processing, approval, or issuance of applications, permits, and approvals for Data
Centers for a period not to exceed nine months from the Effective Date of this Ordinance.
During the moratorium, the County shall not accept, process, approve, or issue any application,
permit, or approval for a Data Center unless expressly exempted under Section E of this
Ordinance.
The moratorium shall remain in effect until the earliest of:
a. Nine months after the Effective Date;
b. The effective date of an ordinance adopted by County Council establishing applicable
regulations for Data Centers; or
c. The effective date of an ordinance adopted by County Council terminating the
moratorium.
Nothing in this Ordinance requires Beaufort County Council to adopt permanent regulations
authorizing Data Centers.
E. Applications and Approvals Subject to the Moratorium. The moratorium applies to any
application, petition, request, plan, permit, or other submission seeking approval, review, or relief
for a Data Center, including, but not limited to:
a. A zoning-map amendment or zoning-text amendment submitted for a specific Data
Center, site, or user;
b. A special use, variance, or similar discretionary land use approval;
c. A place type overlay or other master-plan approval;
d. A preliminary or final subdivision application;
e. A land development, site development, grading, clearing, or stormwater management
plan;
f. A building permit, electrical permit, mechanical permit, plumbing permit, or other
construction permit for a Data Center;
g. A certificate of occupancy or similar approval for a Data Center; and
h. Any other County approval that is necessary for the construction, expansion,
establishment, or operation of a Data Center.
The moratorium applies whether the Data Center is proposed as a principal use, accessory use,
conditional use, special exception, or component of a larger development.
Page 39 of 172
F. Exemptions and Vested Rights. This Ordinance shall not:
a. Prohibit the continued operation, maintenance, repair, or replacement of an existing
lawful facility that qualifies as a Data Center, provided that the work does not result in a
material expansion of the facility’s size, capacity, water use, energy demand, noise,
traffic, or operational intensity;
b. Apply to an application that received final approval before the Effective Date of this
Ordinance, to the extent protected by applicable law;
c. Abrogate or impair rights that have vested under applicable South Carolina law;
d. Prevent the County from processing ministerial permits for work that is authorized by a
valid, unexpired, and previously issued approval; or
e. Prevent County staff from accepting information or conducting preliminary discussions
for planning and informational purposes, provided that no development approval is issued
in violation of this Ordinance.
Nothing in this Section shall be construed to create a vested right where one does not otherwise
exist.
G. Comprehensive Study. During the moratorium, Beaufort County shall conduct or commission a
comprehensive study of the potential direct and cumulative impacts of Data Center development
and shall prepare a written report for consideration by County Council.
The study should evaluate, to the extent reasonably practicable:
a. Consistency with the Beaufort County 2040 Comprehensive Plan and any applicable
community, area, corridor, or special-purpose plans;
b. Compatibility with the County’s stated goals concerning quality of life, community
character, rural lands, environmentally sensitive areas, water resources, and orderly
growth;
c. Electric power demand, transmission capacity, substations, backup-generation systems,
fuel storage, and potential effects on existing and future utility customers;
d. Water consumption, water availability, wastewater capacity, cooling systems, reclaimed
water opportunities, and potential effects on existing water users;
e. Air emissions, noise, vibration, heat, lighting, electromagnetic equipment, and other
operational impacts;
f. Stormwater runoff, flooding, wetlands, tidal areas, groundwater, wildlife habitat, trees,
coastal resources, and other environmental considerations;
g. Traffic, road capacity, heavy vehicles, emergency access, construction impacts, and
required transportation improvements;
h. Fire protection, hazardous material response, emergency services, public safety, and
staffing requirements;
i. Housing availability, residential development patterns, land values, employment, public
revenues, and potential effects on existing businesses and residents;
j. Visual impacts, building scale, setbacks, screening, landscaping, security features,
fencing, and compatibility with surrounding uses;
k. Impacts on historically significant, culturally significant, agricultural, rural, or
environmentally sensitive areas;
Page 40 of 172
l. The adequacy of existing zoning districts and whether Data Centers should be permitted
by right, conditionally, or only in designated locations;
m. Appropriate minimum standards for parcel size, setbacks, buffers, height, building
design, noise, lighting, water use, energy use, emissions, stormwater, landscaping,
emergency access, and decommissioning; and
n. Appropriate procedures for evaluating the cumulative effects of multiple Data Centers or
large-scale utility-dependent developments.
H. Public Participation and Policy Recommendations. The County shall provide appropriate
opportunities for public participation during the study process, which may include public
meetings, workshops, written comments, stakeholder meetings, and presentations to County
Council or its designated committee.
The written report should include policy recommendations, if any, concerning:
a. Amendments to the County’s comprehensive plan;
b. Amendments to the zoning ordinance or zoning map;
c. Amendments to the Community Development Code, SOLOCO manual or other building
or infrastructure regulations;
d. Geographic areas or zoning districts where Data Centers may be appropriate or
inappropriate;
e. Minimum standards for environmental protection and resource efficiency;
f. Procedures for evaluating cumulative impacts; and
g. Additional studies, standards, or public processes that may be necessary before Data
Centers are approved.
I. Pending Ordinance Doctrine. First reading of this Ordinance shall invoke the Pending
Ordinance Doctrine to the extent recognized and permitted under applicable South Carolina law.
J. Construction and Interpretation. This Ordinance shall be interpreted to provide a temporary
planning period while preserving the County’s ability to administer existing regulations and
protect the public health, safety, and general welfare.
Nothing in this Ordinance shall be construed to authorize a use that is otherwise prohibited by the
County’s applicable ordinances, regulations, or land use plans.
K. Severability. If any provision of this Ordinance is determined to be invalid, unlawful, or
unenforceable by a court of competent jurisdiction, that determination shall not affect the validity
of the remaining provisions, which shall remain in full force and effect.
L. Effective Date. This Ordinance shall become effective immediately upon approval at the first
reading of the Ordinance by Beaufort County Council pursuant to the Pending Ordinance
Doctrine and the Nine-month period of the moratorium shall begin following the required
readings, public hearing, and enactment procedures.
M. Expiration. Unless earlier terminated or superseded as provided in Section D, this Ordinance
shall expire nine months after its approval and execution by the Chair of County Council.
Page 41 of 172
Ordained this ___ day of ______________, 2026
_________________________
Alice Howard, Chair
Attest:
___________________________
Sarah Brock, Clerk to Council
Page 42 of 172
SAMPLE ORDINANCE
ORDINANCE NO. ______
AN ORDINANCE TO AMEND THE BEAUFORT COUNTY COMMUNITY DEVELOPMENT CODE
TO ESTABLISH THE DATA CENTER FLOATING ZONE; TO PROVIDE STANDARDS FOR DATA
CENTER DEVELOPMENT; TO ESTABLISH ELIGIBILITY, APPLICATION, REVIEW, AND
APPROVAL REQUIREMENTS FOR APPLYING THE FLOATING ZONE TO PARTICULAR
PROPERTY; TO IMPLEMENT THE SOUTH CAROLINA LOCAL GOVERNMENT
COMPREHENSIVE PLANNING ENABLING ACT OF 1994; TO PROMOTE CONSISTENCY
WITH THE BEAUFORT COUNTY COMPREHENSIVE PLAN; AND FOR OTHER PURPOSES
WHEREAS, Beaufort County is authorized to adopt and amend zoning regulations pursuant
to the South Carolina Local Government Comprehensive Planning Enabling Act of 1994,
including S.C. Code Sections 6-29-710 through 6-29-790, as amended;
WHEREAS, S.C. Code Section 6-29-720 authorizes a county to establish zoning districts
and expressly recognizes a “floating zone” as a zoning technique consisting of a zone
described in the text of a zoning ordinance but not initially shown on the official zoning
map;
WHEREAS, a floating zone may be applied to a particular parcel meeting the minimum
requirements of the zoning ordinance through legislative action by the County Council;
WHEREAS, Beaufort County has adopted the Beaufort County Comprehensive Plan,
together with its Future Land Use Map, Greenprint Plan, resiliency strategies, and related
implementation materials;
WHEREAS, the Beaufort County Comprehensive Plan provides a framework for managing
growth, protecting natural and cultural resources, directing development toward
appropriate locations, coordinating infrastructure, improving economic resilience, and
preserving Beaufort County’s distinctive coastal character;
WHEREAS, the County Council finds that data centers are specialized, infrastructure-
intensive uses that require tailored standards addressing site location, energy supply,
cooling systems, water demand, noise, visual impacts, emergency response,
environmental and community protection, and eventual decommissioning;
WHEREAS, the County Council finds that the establishment of a floating zone is preferable
to permitting data centers indiscriminately throughout the County because each proposed
location should be evaluated for consistency with the Comprehensive Plan, the Future
Land Use Map, surrounding land uses, infrastructure capacity, environmental constraints,
and community character;
Page 43 of 172
SAMPLE ORDINANCE
WHEREAS, the County Council intends that the Data Center Floating Zone be applied only
where the proposed development is consistent with the Beaufort County Comprehensive
Plan or where any apparent inconsistency is specifically identified, justified, and
addressed through enforceable mitigation measures;
WHEREAS, the County Council finds that this ordinance promotes the Comprehensive
Plan’s objectives concerning coordinated growth, economic development, infrastructure
planning, protection of water resources, climate and flood resiliency, conservation of
natural lands, protection of community character, and orderly development;
NOW, THEREFORE, BE IT ORDAINED by the Beaufort County Council as follows:
Page 44 of 172
SAMPLE ORDINANCE
3.4.90 DATA CENTER FLOATING ZONE (DCFZ)
A. Establishment
The DCFZ is an unmapped zoning district. It shall not appear on the official zoning map
unless and until the County Council applies the DCFZ to a specific parcel or
assemblage of parcels through adoption of a zoning map amendment in accordance
with Section 7.3.40 (Zoning Map Amendment) of this ordinance.
The DCFZ is intended to implement the Beaufort County Comprehensive Plan by
allowing consideration of specialized employment generating development in locations
that are appropriate for the use, adequately served by infrastructure, compatible with
surrounding development, and capable of protecting Beaufort County’s natural,
cultural, scenic, and community resources.
B. Purpose and Intent
The purpose of the DCFZ is to:
1. Provide a predictable but location-sensitive framework for reviewing data centers in
Beaufort County;
2. Direct data center development to locations that are consistent with the Beaufort
County Comprehensive Plan and its Future Land Use Map;
3. Facilitate economic development and technology-related employment while
protecting the County’s quality of life and natural environment;
4. Require coordinated review of energy, water, wastewater, transportation,
emergency-response, stormwater, and telecommunications infrastructure;
5. Protect sensitive receptors and neighboring properties from excessive noise, glare,
vibration, heat, odor, visual impacts, and other external effects;
6. Protect wetlands, waterways, floodplains, forests, wildlife habitat, groundwater
resources, and other critical environmental resources identified in the
Comprehensive Plan;
7. Encourage compact, well-designed, infrastructure-efficient campuses rather than
scattered or incompatible development;
8. Require consideration of sea-level rise, storm surge, flooding, extreme heat, wind,
hurricanes, utility interruptions, and other resiliency issues identified in County
planning documents;
9. Establish clear requirements for emergency response, fire protection, battery
storage, hazardous materials, and public safety;
Page 45 of 172
SAMPLE ORDINANCE
10. Ensure that data center facilities can be responsibly decommissioned and that
obsolete equipment and infrastructure do not become a long-term burden on the
County; and
11. Provide a floating-zone process that allows the County Council to evaluate each
location on its individual merits rather than pre-designating all potentially eligible
property.
C. DCFZ Siting Criteria
1. Consistency with the Comprehensive Plan: The DCFZ and every application to apply
the DCFZ shall be interpreted and administered in accordance with the Beaufort
County Comprehensive Plan, as amended. In reviewing a DCFZ application, the
Planning Commission and County Council shall consider, at a minimum:
a. The Future Land Use Map designation of the property;
b. The Comprehensive Plan’s land-use, growth-management, economic-
development, infrastructure, transportation, natural-resource, resilience,
and community-character policies;
c. The relationship of the proposed use to existing and planned development;
d. Whether the proposed location is within an appropriate growth area,
employment area, activity center, industrial area, or other area identified as
suitable for intensive nonresidential development;
e. Whether the proposed development would conflict with agricultural lands,
conservation lands, rural landscapes, cultural resources, historic resources,
established neighborhoods, or other protected areas identified in the
Comprehensive Plan;
f. Whether adequate public facilities and infrastructure exist or will be
provided in a timely manner;
g. Whether the proposed development advances the Comprehensive Plan’s
objectives for economic resilience without undermining environmental
resilience or community character; and
h. Whether the proposed development has been designed to avoid or minimize
impacts associated with flooding, sea-level rise, storm events, water-quality
degradation, tree-canopy loss, and habitat fragmentation.
2. Minimum Site Area: The property shall contain at least 50 contiguous acres, unless
the County Council determines that a smaller site is appropriate because it is part
of an existing industrial campus or coordinated employment center;
Page 46 of 172
SAMPLE ORDINANCE
3. Access: The property shall have direct access to a public road capable of safely
accommodating anticipated construction, employee, service, and emergency
traffic;
4. Adequate Utilities and Services: The applicant shall demonstrate that electric,
water, wastewater, telecommunications, stormwater, and emergency-response
infrastructure can adequately serve the proposed development;
D. Definitions
For purposes of the DCFZ, the following definitions apply. Where a term is not defined
in this article, the definition in the Beaufort County Community Development Code
shall apply.
1. Data Center: A facility, campus of facilities, or group of interconnected facilities
that houses computer servers or other information-technology equipment and is
designed or used for the storage, processing, management, transmission, or
distribution of digital data.
A Data Center may include, without limitation, associated electrical substations,
transformers, switchyards, backup generators, fuel storage, cooling systems,
water-treatment or water-storage systems, telecommunications equipment,
security facilities, administrative space, parking areas, access roads, and other
accessory or supporting infrastructure.
2. Data Center Electrical Substation: A facility used for transforming, switching,
regulating, transmitting, or distributing electric power primarily to serve a data
center or data center campus located on the same or adjoining property or
immediately across a public right-of-way.
3. Community Noise Equivalent Level: The twenty-four-hour A-weighted average
sound level, adjusted by adding five decibels to sound levels occurring from 7:00
p.m. to 10:00 p.m. and ten decibels to sound levels occurring from 10:00 p.m. to
7:00 a.m.
4. Sensitive Receptor: Uses that are particularly sensitive to noise, vibration, glare, air
emissions, or other operational impacts. Sensitive receptors include the following
uses or locations:
a. A residence;
b. A school, preschool, daycare center, or in-home daycare;
c. A hospital, medical facility, nursing home, assisted-living facility, or retirement
community;
d. A place of worship;
Page 47 of 172
SAMPLE ORDINANCE
e. A community center;
f. A public park, passive park, or public open-space area;
g. A campground;
h. A prison, dormitory, or similar congregate-living facility; or
i. Any other use identified by the Director as particularly sensitive to noise,
vibration, glare, air emissions, or other operational impacts.
5. Critical Environmental Resource: A wetland, watercourse, tidal creek, riparian area,
floodplain, flood-prone area, groundwater-recharge area, habitat of a threatened or
endangered species, mature forest, significant tree stand, conservation area,
cultural landscape, historic resource, or other environmentally or culturally
sensitive area identified by applicable federal, state, or County regulations, or the
Comprehensive Plan.
E. Uses
1. Permitted Uses
a. Data Center Campus: A Data Center Campus may contain one or more Data
Center Principal Buildings and associated Data Center Accessory Uses
approved as part of a unified development plan.
b. Manufacturing, Processing, and Packaging – Light (Table 3.1.70 Land Use
Definitions)
c. Warehousing (Table 3.1.70 Land Use Definitions)
d. Wholesaling and Distribution (Table 3.1.70 Land Use Definitions)
2. Accessory Uses
a. Administrative, management, and security offices;
b. Fiber-optic and telecommunications facilities;
c. Electrical substations and transformers;
d. Emergency and standby generators;
e. Cooling systems and mechanical equipment;
f. Battery energy-storage systems;
g. Water-storage, water-treatment, and cooling-water systems;
h. Wastewater treatment or pretreatment facilities;
i. Fire-suppression and fire-protection facilities;
j. Maintenance, repair, and storage buildings;
k. Solar energy facilities located on building roofs, parking canopies, or previously
disturbed areas; and
Page 48 of 172
SAMPLE ORDINANCE
3. Prohibited Uses: The following uses are prohibited within the DCFZ unless
separately approved under applicable County regulations:
a. Commercial electric generation for sale to the regional electric grid during
normal operations;
b. A general-purpose warehouse or distribution center unrelated to the data
center;
c. Outdoor storage of equipment, materials, or containers visible from a public
road or Sensitive Receptor;
d. Disposal, burial, or long-term outdoor storage of electronic waste;
e. Residential use, except for temporary security or caretaker facilities approved
by the County;
f. Cryptocurrency mining operations not associated with the approved data center
use; and
g. Any use that generates noise, emissions, vibration, glare, heat, odor, or traffic
substantially inconsistent with the approved DCFZ development plan.
F. Development Standards
1. General Site Design: All Data Center Principal Buildings and accessory structures
shall be located, designed, and constructed to be compatible with the site,
surrounding properties, existing public roads, and the community character
described in the Beaufort County Comprehensive Plan. The applicant shall design
the campus to:
a. Minimize the visual bulk of buildings and equipment;
b. Preserve existing mature trees and natural vegetation to the maximum extent
practicable;
c. Avoid wetlands, flood-prone areas, riparian areas, and other Critical
Environmental Resources;
d. Reduce land disturbance and unnecessary impervious surface;
e. Provide safe access for employees, service vehicles, emergency responders,
and utility providers;
f. Minimize impacts to adjacent residences, public roads, scenic corridors, and
community facilities;
g. Use building placement, grading, landscaping, berms, and screening to preserve
the visual character of the surrounding area; and
h. Support the Comprehensive Plan’s objectives for resilient, well-coordinated,
and resource-sensitive development.
Page 49 of 172
SAMPLE ORDINANCE
2. Maximum Building Height: The maximum height of a Data Center Principal Building
shall be 50 feet, measured in accordance with the Beaufort County Community
Development Code.
3. Building Setbacks
a. 200 feet from all property lines adjoining a Sensitive Receptor;
b. 150 feet from a public road right-of-way;
c. 200 feet from property located in a residential zoning district;
d. 100 feet from all other property lines; and
4. Buffers and Screening: The minimum buffer shall be:
a. Sensitive Receptor or residential zoning district - 200 feet
b. Public road right-of-way - 150 feet
c. Park, open space, conservation area, or cultural resource - 150 feet
d. Other nonresidential property - 75 feet
e. Buffer planting requirements of the “Type E” buffer in Table 5.8.90.D.
f. The Director may require additional buffering based on the results of a Visual
Impact Assessment.
4. Parking and Loading:
a. A minimum of one parking space per employee on the largest regularly
scheduled shift shall be provided, together with at least three visitor spaces.
b. Loading bays, service entrances, and loading areas shall be located on the side
or rear of the Data Center Principal Building; be screened from public roads and
Sensitive Receptors; not obstruct emergency access; include adequate on-site
maneuvering space; and be designed to prevent trucks from queuing on public
roads.
G. Noise and Vibration
1. Noise Intensity Restrictions: Noise from a Data Center Campus, measured at the
property boundary, shall not exceed:
a. 60 dBA CNEL where the receiving property contains a Sensitive Receptor;
b. 70 dBA CNEL where the receiving property does not contain a Sensitive
Receptor; and
c. The more restrictive limit imposed by any applicable County noise regulation.
d. Sound produced for a cumulative period of not more than one minute in any
hour may exceed the applicable limit by no more than 10 dBA, except for
emergency alerts and emergency operations.
Page 50 of 172
SAMPLE ORDINANCE
2. Tonal and Low-Frequency Noise: In addition to dBA measurements, the applicant
shall demonstrate that the operation will not create unreasonable tonal, low-
frequency, or impulsive noise.
3. Noise Study Required: A pre-construction noise study shall be submitted with every
DCFZ application. The study shall:
a. Establish existing ambient conditions;
b. Identify all proposed noise sources;
c. Model normal and emergency operating conditions;
d. Analyze rooftop and ground-mounted equipment;
e. Analyze generators, cooling equipment, transformers, battery systems, and
substations;
f. Identify Sensitive Receptors;
g. Recommend noise-control measures; and
h. Demonstrate compliance with this ordinance and the Comprehensive Plan’s
objectives concerning compatible development and protection of community
character.
i. The study shall be prepared by a qualified acoustical engineer or other
professional approved by the Director.
4. Post Construction Noise Study: A post-construction noise study shall be completed
before issuance of a certificate of occupancy. The County may require additional
as-built testing if complaints or field observations indicate possible
noncompliance. The County may require analysis using:
a. C-weighted decibels, or dBC;
b. One-third octave-band analysis;
c. Low-frequency noise analysis; and
d. Any other methodology recommended by a qualified acoustical professional.
5. Noise Mitigation Methods: Noise mitigation methods may include:
a. Equipment selection;
b. Acoustic enclosures;
c. Sound walls;
d. Berms;
e. Building orientation;
f. Increased setbacks;
g. Equipment relocation;
h. Operational restrictions;
i. Vibration isolation; and
Page 51 of 172
SAMPLE ORDINANCE
j. Other measures recommended by the noise study.
6. Exemptions: The limits in this section do not apply to:
a. Emergency alarms;
b. Emergency work necessary to protect life, property, public health, or public
safety;
c. Emergency generation of electricity during an outage;
d. Emergency utility repairs; or
e. Other activities expressly exempted by applicable County regulations.
H. Lighting, Glare, and Visual Impacts
1. General Lighting Requirements: All exterior lighting shall meet the requirements of
Division 5.7.
2. After Hours Lighting: After hours security lighting shall:
a. Use motion sensors, dimming controls, or equivalent technology where
feasible;
b. Be limited to the minimum fixtures necessary for security and emergency
response;
c. Not exceed 25 percent of the fixtures used during normal operating hours unless
justified by a security plan; and
d. Not create glare visible from adjacent residences, public roads, waterways, or
scenic corridors.
3. Visual Impact Assessment: The applicant shall submit a visual-impact assessment
of the data center that includes:
a. Photographs and view-shed maps;
b. Simulations from public roads and Sensitive Receptors;
c. Building-height analysis;
d. Evaluation of substations, generators, cooling towers, tanks, fencing, and other
major equipment;
e. Proposed landscaping and screening;
f. Analysis of scenic corridors and community character; and
g. Measures to achieve consistency with the Comprehensive Plan.
4. Berms and Screening Walls:
a. Berms may be used in combination with landscaping where appropriate.
b. Berms shall have a maximum slope of 3:1 unless the County approves a steeper
slope based on an erosion-control plan.
c. Screening shall have 100% opacity;
Page 52 of 172
SAMPLE ORDINANCE
d. Use durable materials compatible with the principal building;
e. Be maintained in good condition; and
f. Prevent visibility from public roads and Sensitive Receptors;
g. Reduce noise;
h. Avoid excessive building bulk; and
i. Comply with the approved visual-impact assessment.
j. Rooftop equipment shall be screened by a parapet, penthouse, or opaque
screen on all sides.
I. Electrical, Mechanical and Utility Facilities
Generators, transformers, substations, cooling equipment, tanks, battery systems,
pumps, and other ground-mounted equipment shall be located to minimize impacts on
public roads, Sensitive Receptors, and neighboring properties. Equipment shall not be
located in a required buffer yard except where specifically approved as part of the
development plan and adequately screened.
1. Electrical Substations: A Data Center Electrical Substation shall:
a. Be located on the side or rear of the principal building where feasible;
b. Be screened from public view;
c. Comply with applicable electrical, fire, environmental, and utility regulations;
d. Be set back from property lines as required by this ordinance;
e. Include appropriate spill prevention and containment measures; and
f. Be evaluated for noise, visual, electromagnetic, and emergency-response
impacts.
g. Power lines serving the site shall be placed underground where feasible. On-site
distribution lines of 34.5 kilovolts or less shall be placed underground unless the
County approves an alternative based on technical infeasibility.
2. Generators and Fuel Storage: Generators and fuel-storage facilities shall:
a. Be located outside required buffers;
b. Comply with applicable fire, building, environmental, and air-quality
requirements;
c. Include secondary containment where required;
d. Include spill-response procedures;
e. Be designed to minimize noise and emissions; and
f. Be tested only during approved hours unless testing is necessary for emergency
preparedness.
J. Water Conservation
Page 53 of 172
SAMPLE ORDINANCE
1. Water Supply Analysis: The applicant shall submit a water-supply analysis
addressing:
a. Average daily demand;
b. Maximum daily demand;
c. Peak demand;
d. Cooling-water demand;
e. Fire-flow demand;
f. Backup-water requirements;
g. Water-recycling and reuse opportunities;
h. Source availability;
i. Impacts on other customers;
j. Drought and emergency conditions; and
k. Consistency with the Comprehensive Plan’s water-resource, infrastructure, and
resilience policies.
2. Water Conservation Requirements: The County shall not approve a DCFZ
application unless the applicant demonstrates that the proposed water demand
can be accommodated without unacceptable impacts to existing users, public
health, groundwater resources, or the long-term water-resource objectives of the
Comprehensive Plan. At a minimum the data center shall incorporate the following:
a. Closed-loop cooling systems;
b. Reclaimed or non-potable water;
c. Rainwater capture;
d. Condensate recovery;
e. Cooling technologies that reduce water use;
f. Leak detection;
g. Water metering; and
h. Water-efficiency monitoring.
3. Wastewater: The applicant shall identify the volume, characteristics, treatment,
and discharge method for all wastewater generated by the development. No
wastewater may be discharged to a public or private system without written
confirmation that the receiving system has adequate capacity and that the
discharge is permitted.
K. Environmental and Community Impact Analysis
Before the Planning Commission considers a DCFZ application, the applicant shall
submit an Environmental and Community Impact Analysis prepared by qualified
professionals. The analysis shall include:
Page 54 of 172
SAMPLE ORDINANCE
1. A narrative description of the proposed use and operations;
2. The size, phasing, and anticipated useful life of the facility;
3. The number of employees by shift;
4. Construction and operational traffic;
5. Energy demand;
6. Water demand;
7. Wastewater generation;
8. Stormwater impacts;
9. Air emissions;
10. Noise and vibration;
11. Heat and thermal impacts;
12. Lighting and glare;
13. Solid-waste and electronic-waste management;
14. Emergency-response requirements;
15. Fire-protection requirements;
16. Utility infrastructure;
17. Potential impacts on schools, residences, parks, cultural resources, and public
facilities;
18. Impacts on municipal and County revenues and expenses;
19. Cumulative impacts with other approved or proposed development; and
20. Consistency with the Beaufort County Comprehensive Plan.
L. Safety and Emergency Response
All development shall comply with the applicable building, fire, electrical, mechanical,
and life-safety codes.
1. Emergency Response Plan: The applicant shall submit an Emergency Response
Plan prepared by a qualified professional and reviewed by the applicable fire
department and emergency-management officials. The plan shall address:
a. Fire suppression;
b. Battery fires;
c. Generator and fuel incidents;
d. Electrical emergencies;
e. Hazardous materials;
f. Evacuation;
g. Emergency access;
h. Hydrant locations and fire-flow capacity;
i. Smoke and toxic-gas conditions;
Page 55 of 172
SAMPLE ORDINANCE
j. Facility shutdown procedures;
k. Emergency contacts; and
l. Training for first responders.
2. Battery Energy Storage: Battery energy-storage systems shall:
a. Comply with applicable fire and building codes;
b. Comply with NFPA 855 or any successor standard;
c. Include fire detection and suppression systems appropriate to the technology;
d. Include thermal-runaway monitoring;
e. Include emergency shutdown procedures;
f. Be located and separated to protect adjoining property; and
g. Be addressed in the Emergency Response Plan.
3. Coordination with Emergency Service Providers: The applicant shall coordinate with
the appropriate County emergency-management and public-safety agencies to
ensure adequate radio coverage within the facility. Where necessary, the applicant
shall install an emergency-responder communication enhancement system.
4. Emergency Contact Information: A 24-hour emergency contact sign shall be posted
at the principal access entrance. The sign shall include:
a. The facility name;
b. The owner or operator;
c. The name and telephone number of the responsible representative;
d. The emergency contact telephone number;
e. The applicable electric utility; and
f. Any other information required by the County or fire department.
M. Decommissioning
1. Decommissioning Plan: A decommissioning plan shall be submitted with every
DCFZ application. The plan shall address:
a. The anticipated operational life of the facility;
b. Removal of servers, racks, cabling, batteries, generators, transformers, cooling
systems, tanks, and other specialized equipment;
c. Removal of obsolete utility infrastructure;
d. Electronic-waste recycling;
e. Responsible disposal of hazardous materials;
f. Restoration or reuse of buildings and structures;
g. Site restoration;
h. Reuse or redevelopment of the property; and
i. Financial responsibility for decommissioning.
Page 56 of 172
SAMPLE ORDINANCE
2. Financial Security: Before issuance of a certificate of occupancy, the owner shall
provide financial security acceptable to the County in an amount equal to 110
percent of the estimated cost of decommissioning, less the documented salvage
value of reusable equipment. The County may require the financial security to be
increased if the updated estimate demonstrates that the existing security is
insufficient. Financial security may consist of:
a. A surety bond;
b. An irrevocable letter of credit;
c. A cash escrow;
d. A guaranty from an acceptable financial institution; or
e. Another form approved by the County Attorney and Finance Director.
f. The decommissioning cost estimate shall be prepared by a qualified
professional and reviewed at least every five years.
3. Abandonment: A Data Center Campus shall be considered abandoned if:
a. The facility has ceased operations for 12 consecutive months;
b. The owner has not submitted an approved redevelopment or reuse plan; and
c. The County determines that the facility is not being maintained for an active,
permitted use.
d. Upon abandonment, the County may require implementation of the approved
decommissioning plan.
N. Resiliency
The applicant shall demonstrate how the facility supports the resilience objectives of
the Beaufort County Comprehensive Plan and related County resilience strategies.
Applicants are encouraged to incorporate green-building and low-impact-development
practices consistent with the Comprehensive Plan.
Page 57 of 172
STATE OF SOUTH CAROLINA
COUNTY OF BEAUFORT
BEAUFORT COUNTY COUNCIL
ORDINANCE NO. 2026/____
AN ORDINANCE TO AMEND THE BEAUFORT COUNTY COMMUNITY
DEVELOPMENT CODE TO PROHIBIT DATA CENTERS AS A PERMITTED,
CONDITIONAL, OR ACCESSORY USE IN ALL ZONING DISTRICTS OF BEAUFORT
COUNTY, SOUTH CAROLINA; TO DEFINE "DATA CENTER"; TO ESTABLISH
APPLICABILITY TO PENDING AND FUTURE APPLICATIONS; TO PROVIDE FOR
VESTED RIGHTS AND NONCONFORMITIES; TO PROVIDE FOR SEVERABILITY;
AND TO PROVIDE AN EFFECTIVE DATE.
W HEREAS, Beaufort County has adopted the Beaufort County Community Development
Code (the “Development Code”) pursuant to the South Carolina Local Government
Comprehensive Planning Enabling Act of 1994, S.C. Code Ann. § 6-29- 310 et seq., and
specifically the zoning authority conferred by S.C. Code Ann. § 6-29-720, to implement the goals,
objectives, and land use policies of the Beaufort County Comprehensive Plan; and
W HEREAS, large-scale data centers, defined generally as facilities primarily housing
computer servers, network infrastructure, and associated cooling, backup power, and switching
equipment for the storage, processing, management, or distribution of data, are land uses that are
fundamentally distinct in character, intensity, and community benefit from the residential,
commercial, mixed-use, agricultural, and light industrial uses contemplated by the Development
Code and the Comprehensive Plan; and
W HEREAS, data centers characteristically require large, continuous volumes of potable
and/or non-potable water for cooling, substantial and often continuous electric load on the order
of tens to hundreds of megawatts, extensive backup diesel or natural gas generation, and high-
capacity transmission infrastructure, each of which places direct and disproportionate demands on
Beaufort County’s water resources, electric grid capacity, and air quality, and each of which is
inconsistent with the rural, coastal, and low-impact development character that the Comprehensive
Plan and the Development Code are designed to protect; and
W HEREAS, Beaufort County’s natural resources, including its sole -source and shallow
aquifers, tidal creeks, salt marsh, and the Port Royal Sound and May, Broad, Chechessee, Coosaw,
and Combahee River systems, are finite, ecologically sensitive, and already subject to documented
saltwater intrusion, withdrawal, and water- quality pressures, such that the introduction of a high
water and high energy consumption industrial use of this kind poses an unacceptable risk to those
resources and to the County’s long-term water and energy planning; and
SAMPLE ORDINANCE
Page 58 of 172
WHEREAS, data centers typically generate comparatively few permanent jobs per acre
and per dollar of capital investment relative to other commercial and industrial uses, generate
continuous mechanical and generator noise, require large impervious footprints and per imeter
security fencing inconsistent with the pedestrian-oriented and form-based design standards of the
Development Code, and are generally incompatible, in scale, appearance, traffic generation, and
neighborhood integration, with the character of the com munities, neighborhoods, and rural
districts of Beaufort County; and
WHEREAS, County Council finds that the values, environmental resources, infrastructure
capacity, and community character of Beaufort County are best protected by prohibiting data
centers as a use in all zoning districts of the County, rather than by attempting to m itigate their
impacts through conditional use, special exception, or performance standards review; and
WHEREAS, the Beaufort County Planning Commission has reviewed this proposed text
amendment to the Development Code for consistency with the Comprehensive Plan and has
forwarded its recommendation to County Council in accordance with S.C. Code Ann. § 6-29-720
and 6-29-760; and
WHEREAS, County Council finds that this Ordinance is a valid and reasonable exercise
of the County’s zoning and police power authority under S.C. Code Ann. § 4-9-25 and Chapter 29
of Title 6 of the South Carolina Code of Laws, bears a rational relationship to legit imate
governmental interests in protecting public health, safety, welfare, water and energy resources, and
community character, and is consistent with and implements the Beaufort County Comprehensive
Plan;
NOW, THEREFORE, BE IT ORDAINED by the County Council of Beaufort County,
South Carolina, in Council duly assembled, as follows:
SECTION 1. FINDINGS.
The foregoing recitals are incorporated herein as findings of County Council. County Council
further finds that the prohibition enacted by this Ordinance applies uniformly to the use
denominated “Data Center” as defined in Section 2 of this Ordinance, throughout every zoning
district established under Article 3 of the Development Co de, including all Transect Zones,
Conventional Zones, and Overlay Zones, and is not directed at any specific applicant, parcel, or
pending application.
SECTION 2. DEFINITION ADDED.
Article 10.1.40 (D Definitions) of the Development Code is hereby amended to add the following
definition, inserted in alphabetical order:
Page 59 of 172
Data Center. A building, structure, or portion thereof, or a campus of such buildings or
structures, designed, constructed, or used primarily to house computer servers, data storage
systems, network switching or routing equipment, or related electronic data processing
equipment, together with the associated cooling systems (including but not limited to
chillers, cooling towers, and water -based cooling infrastructure), uninterruptible power
supply systems, backup or standby electric generation equipment, and dedicated electrical
substation or switchgear infrastructure serving such use. The term includes, without
limitation, facilities marketed, described, or classified as “colocation facilities,” “server
farms,” “hyperscale data centers,” “enterprise data centers,” and “cloud computing
facilities,” regardless of the number of tenants. The term does not include: (i) computer or
server rooms accessory to and located within a principal building whose primary use is not
data processing or storage, provided such accessory space does not exceed [___] square
feet of floor area and does not require dedicated new electrical substation infrastructure;
(ii) equipment shelters, cabinets, or structures accessory to a wireless communication
facility or wireline telecommunications facility otherwise regulated under Article 4 of this
Code; or (iii) facilities operated directly by Beaufort County, the State of South Carolina,
or a federal agency for internal governmental information technology functions and not
offered for lease, colocation, or commercial data-hosting purposes to third parties.
SECTION 3. USE TABLE AMENDED — DATA CENTERS PROHIBITED IN ALL
ZONING DISTRICTS.
Article 4 (Specific to Use) of the Development Code, including the Table of Allowed Uses (and
any corresponding use tables in Article 3 to include but not limited to, Consolidated Use Table
3.1.60, Division 3.2 (Transect Zones) and Division 3.3 (Conventional Zones)), is hereby amended
to add the use “Data Center” as a listed use, designated “Use Not Allowed” (“—”) in every zoning
district of Beaufort County, as follows:
Use All Transect Zones
(T1-T4, TNCP)
All Conventional &
Overlay Zones
Data Center (as defined in Article 10) — Use Not Allowed — Use Not Allowed
This prohibition applies without exception in every zoning district of the County, including
without limitation districts in which data processing, office, commercial, or industrial uses are
otherwise permitted, conditionally permitted, or permitted subjec t to design or performance
standards. No conditional use permit, special exception, variance, planned development district,
Traditional Community Plan designation, or development agreement may be used to authorize a
Data Center use.
SECTION 4. ACCESSORY AND TEMPORARY USES.
No structure, equipment, or infrastructure that would independently meet the definition of “Data
Center” in Section 2 of this Ordinance may be established as an accessory use, temporary use, or
phase of any otherwise permitted principal use. This Section does not prohibit ordinary
Page 60 of 172
information technology infrastructure accessory to a lawful principal use that falls within the
exclusions in Section 2 of this Ordinance.
SECTION 5. APPLICABILITY; PENDING APPLICATIONS; VESTED RIGHTS.
This Ordinance applies to all applications for rezoning, conditional use approval, site plan
approval, development plan approval, and building or zoning permits for a Data Center use that
have not received final, unappealable approval as of the effective date of this Ordinance. In
accordance with S.C. Code Ann. § 6-29-1510 et seq. nothing in this Ordinance shall be construed
to divest a vested right established prior to the effective date of this Ordinance through the approval
of a site-specific development plan, a recorded development agreement under S.C. Code Ann. §
6-31-10 et seq., or other vesting mechanism recognized under South Carolina law. In the absence
of such a vested right, no applicant shall acquire a right to establish a Data Center use in Beaufort
County based solely on the filing of an application, the payment of fees, pre -application
conferences, or informal staff communications.
SECTION 6. NONCONFORMITIES.
Any Data Center lawfully established and in operation prior to the effective date of this Ordinance
shall be treated as a nonconforming use under Article 8 (Nonconformities) of the Development
Code, and shall not be expanded, enlarged, or increased in capacity (including additional building
floor area, additional electrical load, or additional server or cooling capacity beyond that lawfully
in place as of the effective date), and shall be subject to the discontinuance and restoration
limitations generally applicable to nonconforming uses under Article 8.
SECTION 7. CONFLICTING PROVISIONS.
All ordinances, resolutions, and provisions of the Development Code or the Beaufort County Code
of Ordinances in conflict with this Ordinance are hereby repealed to the extent of such conflict.
SECTION 8. SEVERABILITY.
If any section, subsection, sentence, clause, phrase, or portion of this Ordinance is for any reason
held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be
deemed a separate, distinct, and independent provision, and such holding shall not affect the
validity of the remaining portions of this Ordinance. County Council hereby declares that it would
have enacted this Ordinance and each section, subsection, clause, and phrase thereof irrespective
of the fact that any one or more sections, subsections, clauses, or phrases be declared invalid.
Page 61 of 172
SECTION 9. EFFECTIVE DATE.
This Ordinance shall become effective immediately upon third and final reading by County
Council and ratification in accordance with the Beaufort County Code of Ordinances and
applicable South Carolina law.
Read the first time this ____ day of ______________, 2026.
Read the second time this ____ day of ______________, 2026.
Read the third time and ratified this ____ day of ______________, 2026.
BEAUFORT COUNTY COUNCIL
_______________________________________
Chairman, Beaufort County Council
ATTEST:
_______________________________________
Clerk to Council
Approved as to form:
_______________________________________
County Attorney
Page 62 of 172
BEAUFORT COUNTY
NATURAL RESOURCES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE AMENDING THE ZONING MAP FOR 502 ACRES LOCATED ON DULAMO ROAD AND ST.
HELENVILLE ROAD (R300 007 000 0002 0000; R300 012 000 0256 0000) FOR THE REMOVAL FROM THE
CULTURAL PROTECTION OVERLAY (CPO) DISTRICT.
MEETING NAME AND DATE:
Natural Resources Committee November 2, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends denial.
PRESENTER INFORMATION:
Rob Merchant
ITEM BACKGROUND:
The applicant is requesting to remove the two parcels that make up Pine Island from the Cultural Protection
Overlay (CPO) District.
FISCAL IMPACT:
APPROVAL HISTORY:
At their October 5th meeting, the Planning Commission voted 7-0 to recommend denial of the rezoning
request.
Page 63 of 172
CDPA-000062-2026– Pine Island Zoning Amendment – Removal from CPO Page 1 of 7
TO: York Glover, Chair, Natural Resources Committee of County Council
FROM: Robert Merchant, AICP, Beaufort County Planning and Zoning Department
DATE: October 14, 2026
SUBJECT: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 502 ACRES
LOCATED ON DULAMO ROAD AND ST. HELENVILLE ROAD (R300 007 000 0002 0000;
R300 012 000 0256 0000) FOR THE REMOVAL FROM THE CULTURAL PROTECTION
OVERLAY (CPO) DISTRICT
STAFF REPORT:
A. BACKGROUND:
Case No. CDPA-000062-2026
Owner/Applicant: Elvio Tropeano/Kevin E. Dukes, Esq.
Property Location: Located at 288 Dulamo Road on St. Helena Island in
northern Beaufort County
District/Map/Parcel: R300 007 000 0002 0000 and R300 012 000 0256 0000
Property Size: 502 acres
Current Future Land Use: Rural
Current Zoning District: T2 Rural with the Cultural Protection Overlay (CPO)
Zone
Proposed Zoning District: T2 Rural
B. SUMMARY OF REQUEST: The applicant is requesting to remove the two parcels that make up
Pine Island from the Cultural Protection Overlay (CPO) District.
C. EXISTING ZONING: Pine Island is currently zoned T2 Rural (T2R), which permits residential
development at a density of one dwelling unit per 3 acres. T2 Rural also permits very limited
non-residential uses. This application differs from a similar application that the Planning
Commission reviewed at their May 5, 2025 meeting. This time 502 acres are being proposed to
be removed from the CPO rather than 437 acres. Also, the applicant is not proposing an
MEMORANDUM
Page 64 of 172
CDPA-000062-2026– Pine Island Zoning Amendment – Removal from CPO Page 2 of 7
accompanying development agreement. It is important to note that removing the property from
the CPO would allow the uses (golf courses, resorts, and gated communities) that are restricted
by the CPO to locate on the Pine Island property.
The Rural (T2R) Zone is intended to preserve the rural character of Beaufort County. This Zone
applies to areas that consist of sparsely settled lands in an open or cultivated state. It may
include large lot residential, farms where animals are raised or crops are grown, parks,
woodland, grasslands, trails, and open space areas.
Pine Island also falls within the Cultural Protection Overlay (CPO) Zone. Overlay Zones impose a
set of requirements or relax a set of requirements imposed by the underlying zoning district
when there is a special public interest in a particular geographic area that does not coincide with
the underlying zone boundaries. Specifically, the CPO restricts franchise architecture and
prohibits restricted access (gated) communities, resorts, and golf courses which were deemed to
be incompatible with cultural protection.
D. CULTURAL PROTECTION OVERLAY (CPO) ZONE: The Cultural Protection Overlay (CPO) Zone has
been established land use policy in Beaufort County since 1999. The CPO was originally adopted
on April 26, 1999, when the County adopted its Zoning and Development Standards Ordinance
following an extensive community process. The stated purpose of the district was to “provide
opportunities to protect natural and/or cultural resources found on St. Helena Island.” The
purpose statement goes on to say the following:
“Although, the intent of the CPO district is to protect St. Helena and the Gullah culture from
encroaching development pressures, growth is not discouraged. However, the quality and
rate of growth is of concern in these areas. Rapid in-migration would substantially alter the
traditional social and cultural character of this area, as new residents represent different
values and customs. The gentrification of the island would result in greater demand for
urban services and eventually to the urbanization of the island. This can be particularly acute
on St. Helena where maintaining the traditional lifestyle becomes cost prohibitive because of
the value of land of development”
The CPO was referenced in the 2010 Beaufort County Comprehensive Plan stating that staff
should “continue to enforce the Cultural Preservation Overlay” and “determine if additional
policies and regulations are needed for the overlay to better implement its purpose.”
In 2014, the CPO was retained as policy and incorporated into the Community Development
Code (CDC).
On November 8, 2021, County Council adopted the 2040 Comprehensive Plan which further
upheld the CPO as policy recommending the following:
“Reevaluate the CPO District by assessing whether additional land use restrictions are
necessary to meet the intent of the district. Consider the addition of specific design
standards that reinforce historic Gullah/Geechee development patterns and character.
Include diverse representation on the steering committee that may be formed to guide the
process. Ensure public input from all segments of the community.”
Page 65 of 172
CDPA-000062-2026– Pine Island Zoning Amendment – Removal from CPO Page 3 of 7
Following this recommendation from 2040 Comprehensive Plan, County Council appointed the
Cultural Protection Overlay District Committee on November 14, 2022. The CPO Committee was
given further direction by the Community Services and Land Use Committee on January 9, 2023
to study the existing CPO ordinance with the County’s legal department and with other outside
entities of the Committee’s choosing to suggest revisions that can be added to reinforce the
Overlay’s purpose and to improve the protection it provides to St. Helena and the surrounding
islands. As a result of this direction, the CPO Committee met four times in early 2023 focusing
on the purpose statement and definitions and evaluated the language of the CPO in its entirety.
On March 21, 2023, the CPO Committee voted unanimously to recommend to County Council
amendments to the CPO. These amendments were adopted by County Council on May 8, 2023.
E. CULTURAL PROTECTION OVERLAY (CPO) ZONE BOUNDARIES: The boundaries of the CPO apply
to all of St. Helena Island with the exception of Fripp, Harbor, Hunting, Dataw Islands and the
unbridged barrier islands including Pritchard, Capers, St. Phillips and Bay Point Islands. The
applicability statement in the original CPO (1999) states that “the CPO District requirements
apply to new uses; it is not the intent of this section to create nonconforming use of existing
uses. Subdivisions, PUDs and other developments approved prior to the adoption of the 1999
Zoning Development Standards Ordinance (ZDSO) are exempt from the requirements of this
section.” In 1999, Fripp, Harbor and Dataw Islands had well established development patterns
and were excluded from the CPO to avoid rendering these communities nonconforming. The
originally established boundary of the CPO remained unchanged when the CPO was adopted as
part of the Community Development Code in 2014.
F. PREVIOUS APPLICATIONS TO REMOVE PINE ISLAND FROM THE CPO ZONE:
June 2023 Application: The Planning Commission reviewed a similar application at its June 5,
2023 meeting to remove 502 acres of property from the CPO Zone. At that time, the Planning
Commission unanimously recommended denial of the application. County Council, at their June
26, 2023 meeting voted two in favor and 8 opposed to the zoning map amendment and,
therefore, it was defeated.
May 2025 Application: The Planning Commission reviewed an application at its May 5, 2025
meeting to remove 437 acres of property from the CPO Zone. This application did not include a
64.58 acre parcel (R300 012 000 0256 0000), owned by Pine Island Property Holdings LLC. At
that time, the Planning Commission unanimously recommended denial of the application.
County Council, at their September 22, 2025 meeting voted 10 in favor and 1 opposed not to
approve a development agreement between Pine Island Property Holdings LLC and Beaufort
County Council. At that point, the developer withdrew their zoning map amendment
application.
G. ZONING MAP AMENDMENT REVIEW STANDARDS: In determining whether to adopt or deny a
proposed Zone Map Amendment, the County Council shall weigh the relevance of and consider
whether and the extent to which the proposed amendment:
1. Is consistent with and furthers the goals and policies of the Comprehensive Plan and
the purposes of this Development Code.
Page 66 of 172
CDPA-000062-2026– Pine Island Zoning Amendment – Removal from CPO Page 4 of 7
As stated above, the 2040 Comprehensive Plan places great value in protecting the natural and
cultural resources of St. Helena Island. The Plan recognizes challenges facing St. Helena Island
and devotes an entire “Spotlight” section to the island. The Plan provides that “Beaufort
County’s Gullah/Geechee community makes evident that the region’s cultural resources are not
just the historic sites, waterways, sacred grounds, farmlands, open spaces, hunting grounds, and
the land on which traditional events have occurred. The most important cultural resource is the
people themselves.” The Plan further observes that “the primary threat to the long-term
viability of Beaufort County’s Gullah/Geechee communities is land development. Implementing
land use policies that concentrate growth in urban areas and protect rural land from suburban
development are the most important actions the County can take to protect its unique
Gullah/Geechee heritage.” As both a strategy and an action, the Plan calls for County Council to
“reevaluate the CPO District by assessing whether additional land use restrictions are necessary
to meet the intent of the district.”
Upon guidance of the 2040 Comprehensive Plan and the CPO Committee, the purpose
statement of the CPO, as amended by County Council on May 8, 2023 provides greater emphasis
to the threats facing St. Helena Island’s natural and cultural environment stating the following:
“large-scale, rapid, and/or suburban growth, such as gated, master planned communities,
golf courses and resort destinations, conflicts with the Island’s character and presents the
greatest threat to the character and stability of the Island community. Rapid suburban
growth would not only change the character of the area and threaten the natural, cultural
and historic qualities of St. Helena, it would likely bring with it disproportionate and
unsustainable short and long-term demands for urban services and infrastructure and
eventually lead to urbanization or suburbanization of the Island, the loss of natural qualities
which have sustained generations of islanders and which has resulted in the culture and
history of the Island. Therefore, the Cultural Protection Overlay District is designed to
complement the underlying zoning districts on St. Helena Island by limiting large-scale
development such as large master planned communities and resort destinations, that would
substantially alter the rural character and natural landscape, would generate high traffic
volume, and/or would otherwise be incompatible with the culture of St. Helena Island.”
It is clearly established that the location and extent of the CPO boundaries were purposefully
delineated to support and implement the Comprehensive Plan and the purpose statement of
the CPO. Moving the boundaries for the purpose of excluding certain parcels erodes the
effectiveness of the CPO by allowing the very uses that have been identified as posing the
greatest threat to the character and stability of the island community. The magnitude of the
proposed rezoning (502 acres) only increases the potential impact of this rezoning.
2. Is not in conflict with any provision of this Development Code, or the Code of
Ordinances.
Upon guidance of the 2040 Comprehensive Plan and the CPO Committee, the purpose
statement of the CPO, as amended by County Council on May 8, 2023 provides greater emphasis
to the threats facing St. Helena Island’s natural and cultural environment stating the following:
Page 67 of 172
CDPA-000062-2026– Pine Island Zoning Amendment – Removal from CPO Page 5 of 7
“large-scale, rapid, and/or suburban growth, such as gated, master planned communities, golf
courses and resort destinations, conflicts with the Island’s character and presents the greatest
threat to the character and stability of the Island community. Rapid suburban growth would not
only change the character of the area and threaten the natural, cultural and historic qualities of
St. Helena, it would likely bring with it disproportionate and unsustainable short and long-term
demands for urban services and infrastructure and eventually lead to urbanization or
suburbanization of the Island, the loss of natural qualities which have sustained generations of
islanders and which has resulted in the culture and history of the Island. Therefore, the Cultural
Protection Overlay District is designed to complement the underlying zoning districts on St.
Helena Island by limiting large-scale development such as large master planned communities
and resort destinations, that would substantially alter the rural character and natural landscape,
would generate high traffic volume, and/or would otherwise be incompatible with the culture of
St. Helena Island.”
It is clearly established that the location and extent of the CPO boundaries were purposefully
delineated to support and implement the Comprehensive Plan and the purpose statement of
the CPO. Moving the boundaries for the purpose of excluding certain parcels erodes the
effectiveness of the CPO by allowing the very uses that have been identified as posing the
greatest threat to the character and stability of the island community. The magnitude of the
proposed rezoning (502 acres) only increases the potential impact of this rezoning.
3. Addresses a demonstrated community need.
This proposed zoning map amendment does not address any known community need.
4. Is required by changing conditions.
There are no known changing conditions to require this rezoning.
5. Is compatible with existing and proposed uses surrounding the land subject to the application
and is the appropriate zone and uses for the land.
Moving the boundaries of the CPO would introduce land uses to St. Helena Island which have
been identified as posing the greatest threat to the character and stability of the island
community.
6. Would not adversely impact nearby lands.
Moving the boundaries of the CPO would introduce land uses to St. Helena Island which have
been identified as posing the greatest threat to the character and stability of the island
community.
7. Would result in a logical and orderly development pattern.
Moving the boundaries of the CPO would introduce land uses to St. Helena Island which have
been identified as posing the greatest threat to the character and stability of the island
community.
Page 68 of 172
CDPA-000062-2026– Pine Island Zoning Amendment – Removal from CPO Page 6 of 7
8. Would not result in adverse impacts on the natural environment – including, but not limited
to, water, air, noise, storm water management, wildlife, vegetation, wetlands, and the natural
functioning of the environment.
Any future development would need to meet the County’s natural resources protection and
stormwater requirements regardless of the zoning of the property.
9. Would result in development that is adequately served by public facilities (e.g. streets, potable
water, sewerage, storm water management, solid waste collection and disposal, schools,
parks, police, and fire and emergency facilities)
The site is served by Dulamo Road, a paved 2-lane state road approximately 1.9 miles from US
21 (Sea Island Parkway). The proposed change in zoning does not meet the threshold for
requiring a Traffic Impact Analysis. A traffic impact analysis study would be required for future
development of the site if the proposed development is projected to generate 50 peak hour
trips. The site is located in proximity to public water (BJWSA). The proposed change in zoning is
not anticipated to have significant adverse impacts on the provision of solid waste collection and
disposal, schools, parks, police, and emergency facilities. Any future development would need to
meet the County’s stormwater SOLOCO Manual.
H. STAFF RECOMMENDATION:
Staff recommends denial of the proposed zoning amendment. The location and extent of the
CPO boundaries were purposefully delineated to support and implement the Comprehensive
Plan and the purpose statement of the CPO. Moving the boundaries for the purpose of
excluding certain parcels erodes the effectiveness of the CPO by allowing the very uses that
have been identified as posing the greatest threat to the character and stability of the island
community.
In sum, the proposed rezoning is inconsistent with and seeks to defeat the goals and policies of
the Comprehensive Plan and the purposes of the Development Code; is in direct conflict with
provisions of the Development Code; is in direct conflict with the demonstrated needs of the
community which led to the creation of the CPO; is not required by changing conditions; is
incompatible with existing and proposed uses surrounding the land and is not an appropriate
zone or use for the land; is likely to adversely impact nearby lands; will conflict with anticipated
logical and orderly development patterns; will likely have an adverse impact on the natural
environment; and will likely result in increased strain and stress on public facilities.
I. PLANNING COMMISSION RECOMMENDATION: At their October 5th meeting, the Planning
Commission voted 7-0 to recommend denial of the rezoning request.
J. ATTACHMENTS:
• Existing and Proposed Zoning Map
• Application
Page 69 of 172
CDPA-000062-2026– Pine Island Zoning Amendment – Removal from CPO Page 7 of 7
Page 70 of 172
Page 71 of 172
Page 72 of 172
Page 73 of 172
Page 74 of 172
ORDINANCE 2026/________
ORDINANCE AMENDING THE ZONING MAP FOR 502 ACRES LOCATED ON
DULAMO ROAD AND ST. HELENVILLE ROAD (R300 007 000 0002 0000; R300 012
000 0256 0000) FOR THE REMOVAL FROM THE CULTURAL PROTECTION
OVERLAY (CPO) DISTRICT
WHEREAS, the properties located on Dulamo Road and St. Helenville Road (R300 007
000 0002 0000; R300 012 000 0256 0000) are currently zoned T2 Rural with the Cultural
Protection Overlay (CPO) Zone; and
WHEREAS, the owner of the property has requested to remove the properties from the
Cultural Protection Overlay (CPO) Zone; and
WHEREAS, the Beaufort County Planning Commission considered the request on
October 5, 2026, voting unanimously to recommend that County Council deny the request; and
WHEREAS, County Council now wishes to amend the zoning map to remove the
properties from the Cultural Protection Overlay (CPO) Zone.
NOW, THEREFORE be it ordained by County Council in a meeting duly assembled as
follows:
The zoning map of the County is hereby amended to remove the properties located on
Dulamo Road and St. Helenville Road (R300 007 000 0002 0000; R300 012 000 0256 0000)
from the Cultural Protection Overlay (CPO) Zone
Ordained this ___ day of ______________, 2026
_________________________
Alice Howard, Chair
___________________________
Sarah Brock, Clerk to Council
Page 75 of 172
Page 76 of 172
Zoning Map Amendment — Pine Island
CDPA-000062-2026
R300 007 000 0002 0000 and R300 012 000 0256 0000
288 Dulamo Road and 1/3/5 St. Helenville Road, St. Helena Island
Beaufort County Natural Resources Committee · November 2, 2026
Kevin E. Dukes – Harvey & Battey, PA
Elvio Tropeano – Pine Island Property Holdings, LLC
Page 77 of 172
What this application is
Page 78 of 172
The application, as filed
Present zoning classification (and any
applicable overlay districts):
T2 Rural (T2R) and Cultural Protection
Overlay (CPO) Zone
Requested zoning classification:
T2 Rural (T2R)
Zoning Map Amendment application, filed September 2, 2026
Page 79 of 172
Reason for request
Beaufort County Community Development Code § 3.2.40(A)
Page 80 of 172
7.3.40: Zone Map Amendment (Rezoning)
Page 81 of 172
CDC § 7.3.40(A) — Zone Map Amendment (Rezoning) Purpose
“The purpose of this Section is to provide a uniform means for
reviewing and deciding proposed amendments to the Official
Zoning Map…”
Beaufort County Community Development Code § 7.3.40(A)
Page 82 of 172
Why “uniform”?
The Planning Director is legally required to follow CDC§ 7.3.40 and, through
a uniform means, and provide a recommendation to this Legislative Body
that “shall be based on the standards in Subsection 7.3.40.C.”
Uniformity ensures that all applicants, regardless of subject matter,
receive the same treatment under the law…by County Council.
Beaufort County Community Development Code § 7.3.40(C)
Page 83 of 172
Again, why “uniform”?
Beaufort County Planning Commission, September 10th 2026
Page 84 of 172
IT IS IMPORT ANT TO NOTE:
“This Development Code does not allow administrative
decision-makers to consider or create standards not
officially adopted.”
(CDC § 7.3.70(D))
Page 85 of 172
The Same Treatment Under the Law
Page 86 of 172
The Guiding Principles For a Rezoning
Beaufort County Planning Commission, September 10th 2026
Page 87 of 172
“So, every time we come
forward with a map
amendment, we're using that
as our guide in trying to
determine if something is
meeting the comprehensive
plan.”
- September 10
th, 2026.
The Uniform Means: The Future Land Use Map
Page 88 of 172
The Uniform Means: Table 1.4.10
CDC § 1.4.10(A)
1.4.10 - In Accordance with Beaufort County Comprehensive Plan: This Development Code is intended to ensure that all
development within the County's jurisdiction is in accordance with the Beaufort County Comprehensive Plan.
Page 89 of 172
Different Treatment Under the Law
Page 90 of 172
Since 2020: 39 Rezoning Requests Presented to County Council
Page 91 of 172
“every time…”
Beaufort County Planning Commission, September 10th 2026
Page 92 of 172
Since 2020: Three (3) Rezonings have been “analyzed” differently
The Only Applications Subject to Different Standards: Pine Island
As Staff….we can’t be gatekeepers because we have to respect the due process…”
Beaufort County Planning Commission, September 10th 2026
Page 93 of 172
Since 2020: 39 Rezoning Requests Presented to this Committee
Correction: 40 Rezoning Requests Presented to this Committee
Staff Report, CDPA-000061-2026 dated October 20, 2026, page 1
In less than 3 hours the Planning Department will recommend approval of an
UPZONING of 159 acres of RURAL property to accommodate 245 rooftops.
They review the ZMA using The Future Land Use of the property.
+
Page 94 of 172
The Current Staff Report and Staff Recommendation – N/A
Staff Report, CDPA-000062-2026, dated September 17, 2026, page 1
Page 95 of 172
Why Not Use Future Land Use?
Page 96 of 172
Proposed Zoning and Future Land Use ARE NOT Analyzed
• The Planning Department does not provide analysis, as
r
equired by the law, of the “proposed amendment” i.e.
the proposed zoning.
• All other rezoning applications are reviewed under the
f
uture zoning and in accordance with the Future Land Use.
• All rezonings introduce uses not presently allowed. T hat is
the purpose of a rezoning.
Missing Sections: Proposed Zoning and Future Land Use
Map Designation
• This is typically a “uniform” section because otherwise,
ho
w would the decision-making body (County Council)
be able to weigh ”the proposed amendment” against the
Zoning Map Amendment standards?
WHY?
Page 97 of 172
Because The Outcome Is Predetermined
Instead…NEW SECTION
Section D: Cultural Protection Overlay (CPO) Zone
• The Director has inserted a full-pa ge historical
section unrelated to the “proposed amendment.”
• “In 2014, the CPO was retained as policy and
inc
orporated into the Community Development
Code (CDC).”
• It is important to note: In 2014, the County
eliminated the zoning mechanism that historically
produced the “suburban and urban” development
patterns the CPO was designed to address – the
PUD.
“The [Comprehensive] Plan further observes
that “the primary threat to the long-term
viability of Beaufort County’s Gullah/Geechee
communities is land development.
Implementing land use policies that
concentrate growth in urban areas and
protect rural land from suburban
development are the most important actions
the County can take to protect its unique
Gullah/Geechee heritage.””
Page 98 of 172
The Purpose of a Rezoning…
“The Rural (T2R) Zone is intended to preserve
the rural character of Beaufort County.”
The Director refuses to analyze the “proposed
amendment” under T2R…which is the
requested Zoning.
Beaufort County Community Development Code § 3.2.40 and Table 1.4.10.A
“The [Comprehensive] Plan further observes that
“the primary threat to the long-term viability of
Beaufort County’s Gullah/Geechee communities is
land development. Implementing land use
policies that concentrate growth in urban areas
and protect rural land from suburban
development are the most important actions the
County can take to protect its unique
Gullah/Geechee heritage.””
Page 99 of 172
Predetermined Outcome:
You Cannot Change The Boundaries of the CPO…
CPO
Page 100 of 172
But Why?
HCOCPO
Page 101 of 172
“The Heart of St. Helena”
Page 102 of 172
The nine standards, applied to T2 Rural
Page 103 of 172
CDC § 7.3.40(C) — Zone Map Amendment Review Standards
Zone Map Amendment Review Standards. The advisability of an
amendment to the Official Zoning Map is a matter committed to the
legislative discretion of the County Council and is not controlled by any
one factor. In determining whether to adopt or deny a proposed Zone Map
Amendment, the County Council shall weigh the relevance of and consider
whether and the extent to which the proposed amendment:
CDC § 7.3.40(B)(3) — Staff Review and Action
The Director’s recommendation shall be based on the standards in
Subsection 7.3.40(C).
Page 104 of 172
Standards 1 and 2
Standard 1 — Comprehensive Plan consistency
THE STANDARD
The proposed amendment: “Is consistent with and furthers the goals, and
policies of the Comprehensive Plan and the purposes of this Development
Code…”
WHAT THE STAFF REPORT SAYS
“As stated above, the 2040 Comprehensive Plan places great value in protecting the natural and cultural resources of St. Helena Island. The Plan recognizes challenges facing St. Helena Island and
devotes an entire “Spotlight” section to the island. The Plan provides that “Beaufort County’s Gullah/Geechee community makes evident that the region’s cultural resources are not just the
historic sites, waterways, sacred grounds, farmlands, open spaces, hunting grounds, and the land on which traditional events hav e occurred. The most important cultural resource is the people
themselves.” The Plan further observes that “the primary threat to the long-term viability of Beaufort County’s Gullah/Geechee communities is land development. Implementing land use policies
that concentrate growth in urban areas and protect rural land from suburban development are the most important actions the Co unty can take to protect its unique Gullah/Geechee heritage.” As
both a strategy and an action, the Plan calls for County Council to “reevaluate the CPO District by assessing whether additio nal land use restrictions are necessary to meet the intent of the
district.”
Upon guidance of the 2040 Comprehensive Plan and the CPO Committee, the purpose statement of the CPO, as amended by County Co uncil on May 8, 2023 provides greater emphasis to the
threats facing St. Helena Island’s natural and cultural environment stating the following:
“large-scale, rapid, and/or suburban growth, such as gated, master planned communities, golf courses and resort destinations, co nflicts with the Island’s character and presents the greatest
threat to the character and stability of the Island community. Rapid suburban growth would not only change the character of t he area and threaten the natural, cultural and historic qualities of
St. Helena, it would likely bring with it disproportionate and unsustainable short and long -term demands for urban services and infrastructure and eventually lead to urbanization or
suburbanization of the Island, the loss of natural qualities which have sustained generations of islanders and which has resulte d in the culture and history of the Island. Therefore, the Cultural
Protection Overlay District is designed to complement the underlying zoning districts on St. Helena Island by limiting large -scale development such as large master planned communities and
resort destinations, that would substantially alter the rural character and natural landscape, would generate high traffic vo lume, and/or would otherwise be incompatible with the culture of St.
Helena Island.”
It is clearly established that the location and extent of the CPO boundaries were purposefully delineated to support and impl ement the Comprehensive Plan and the purpose statement of the
CPO. Moving the boundaries for the purpose of excluding certain parcels erodes the effectiveness of the CPO by allowing the very uses that have been identified as posing the greatest threat to
the character and stability of the island community. The magnitude of the proposed rezoning (502 acres) only increases the po tential impact of this rezoning.
THE ANSWER, APPLIED TO T2 RURAL
“Yes, the proposed map amendment is consistent with the Comprehensive
Plan. The T2R zoning district is consistent with the future land use map,
which designates the parcels making up the Property as ‘Rural.’ According
to Table 1.4.10 of the CDC, zoning district T2R is consistent with the future
land use designation of Rural.”
Standard 2 — Conflict with the Code
THE STANDARD
The proposed amendment: “Is not in conflict with any provision of this
Development Code, or the Code of Ordinances.”
WHAT THE STAFF REPORT SAYS
Upon guidance of the 2040 Comprehensive Plan and the CPO Committee, the purpose statement of the CPO, as amended by County Co uncil on May 8, 2023 provides greater emphasis to the
threats facing St. Helena Island’s natural and cultural environment stating the following:
“large-scale, rapid, and/or suburban growth, such as gated, master planned communities, golf courses and resort destinations, co nflicts with the Island’s character and presents the greatest
threat to the character and stability of the Island community. Rapid suburban growth would not only change the character of t he area and threaten the natural, cultural and historic qualities of
St. Helena, it would likely bring with it disproportionate and unsustainable short and long -term demands for urban services and infrastructure and eventually lead to urbanization or
suburbanization of the Island, the loss of natural qualities which have sustained generations of islanders and which has resulte d in the culture and history of the Island. Therefore, the Cultural
Protection Overlay District is designed to complement the underlying zoning districts on St.
Helena Island by limiting large-scale development such as large master planned communities and resort destinations, that would s ubstantially alter the rural character and natural landscape,
would generate high traffic volume, and/or would otherwise be incompatible with the culture of St. Helena Island.”
It is clearly established that the location and extent of the CPO boundaries were purposefully delineated to support and impl ement the Comprehensive Plan and the purpose statement of the
CPO. Moving the boundaries for the purpose of excluding certain parcels erodes the effectiveness of the CPO by allowing the very uses that have been identified as posing the greatest threat to
the character and stability of the island community. The magnitude of the proposed rezoning (502 acres) only increases the po tential impact of this rezoning.
THE ANSWER, APPLIED TO T2 RURAL
“The proposal is not in conflict. The T2R district is listed in Table 1.4.10 as a
zoning district that implements the Rural future land use designation. The
amendment is sought under the procedure the Development Code itself
provides for amendment of the Official Zoning Map, CDC § 7.3.40.”
Page 105 of 172
The same two standards, Three months apart
Ordinance 2026/42 — July 23, 2026 THIS APPLICATION
Staff Recommendation: approval.
Council - APPROVED 10-1
Neither answer refers to the future land use map or to Table 1.4.10.
Recommendation: denial.
Standard 1: “As stated above, the 2040 Comprehensive Plan places great value in protecting the natural and cultural resources of St. He lena
Island. The Plan recognizes challenges facing St. Helena Island and devotes an entire “Spotlight” section to the island. The Pla n provides that
“Beaufort County’s Gullah/Geechee community makes evident that the region’s cultural resources are not just the historic site s, waterways,
sacred grounds, farmlands, open spaces, hunting grounds, and the land on which traditional events have occurred. The most import ant cultural
resource is the people themselves.” The Plan further observes that “the primary threat to the long -term viability of Beaufort Co unty’s
Gullah/Geechee communities is land development. Implementing land use policies that concentrate growth in urban areas and pro tect rural land
from suburban development are the most important actions the County can take to protect its unique Gullah/Geechee heritage.” As both a
strategy and an action, the Plan calls for County Council to “reevaluate the CPO District by assessing whether additional land use restrictions are
necessary to meet the intent of the district.”
Upon guidance of the 2040 Comprehensive Plan and the CPO Committee, the purpose statement of the CPO, as amended by County Co uncil on
May 8, 2023 provides greater emphasis to the threats facing St. Helena Island’s natural and cultural environment stating the fol lowing:
“large-scale, rapid, and/or suburban growth, such as gated, master planned communities, golf courses and resort destinations, co nflicts with the
Island’s character and presents the greatest threat to the character and stability of the Island community. Rapid suburban gr owth would not only
change the character of the area and threaten the natural, cultural and historic qualities of St. Helena, it would likely bri ng with it
disproportionate and unsustainable short and long- term demands for urban services and infrastructure and eventually lead to urbanization or
suburbanization of the Island, the loss of natural qualities which have sustained generations of islanders and which has resulte d in the culture and
history of the Island. Therefore, the Cultural Protection Overlay District is designed to complement the underlying zoning di stricts on St. Helena
Island by limiting large-scale development such as large master planned communities and resort destinations, that would substant ially alter the
rural character and natural landscape, would generate high traffic volume, and/or would otherwise be incompatible with the cultu re of St. Helena
Island.”
It is clearly established that the location and extent of the CPO boundaries were purposefully delineated to support and impl ement the
Comprehensive Plan and the purpose statement of the CPO. Moving the boundaries for the purpose of excluding certain parcels e rodes the
effectiveness of the CPO by allowing the very uses that have been identified as posing the greatest threat to the character a nd stability of the
island community. The magnitude of the proposed rezoning (502 acres) only increases the potential impact of this rezoning.
Standard 2: Upon guidance of the 2040 Comprehensive Plan and the CPO Committee, the purpose statement of the CPO, as amended by
County Council on May 8, 2023 provides greater emphasis to the threats facing St. Helena Island’s natural and cultural enviro nment stating the
following:
“large-scale, rapid, and/or suburban growth, such as gated, master planned communities, golf courses and resort destinations, co nflicts with the
Island’s character and presents the greatest threat to the character and stability of the Island community. Rapid suburban gr owth would not only
change the character of the area and threaten the natural, cultural and historic qualities of St. Helena, it would likely bri ng with it
disproportionate and unsustainable short and long -term demands for urban services and infrastructure and eventually lead to urba nization or
suburbanization of the Island, the loss of natural qualities which have sustained generations of islanders and which has resulte d in the culture and
history of the Island. Therefore, the Cultural Protection Overlay District is designed to complement the underlying zoning di stricts on St.
Helena Island by limiting large-scale development such as large master planned communities and resort destinations, that would s ubstantially
alter the rural character and natural landscape, would generate high traffic volume, and/or would otherwise be incompatible with the culture of
St. Helena Island.”
It is clearly established that the location and extent of the CPO boundaries were purposefully delineated to support and impl ement the
Comprehensive Plan and the purpose statement of the CPO. Moving the boundaries for the purpose of excluding certain parcels e rodes the
effectiveness of the CPO by allowing the very uses that have been identified as posing the greatest threat to the character a nd stability of the
island community. The magnitude of the proposed rezoning (502 acres) only increases the potential impact of this rezoning.
Page 106 of 172
Standards 5, 6 and 7 — one sentence, three questions
Standard 5 — Compatibility and appropriate
zone
THE STANDARD
The proposed amendment: “Is compatible with existing and
proposed uses surrounding the land subject to the application,
and is the appropriate zone and uses for the land.”
THE ANSWER, APPLIED TO T2 RURAL
“Yes, T2R is a compatible fit for the surrounding area and is the
appropriate zone for the land. The surrounding land carries the
same T2R base zoning, and the requested amendment
maintains it… The requested amendment therefore maintains
the rural character of St. Helena Island.”
Standard 6 — Impact on nearby lands
THE STANDARD
The proposed amendment: “Would not adversely impact
nearby lands.”
THE ANSWER, APPLIED TO T2 RURAL
“No, it would not. The proposed zoning district would not
disrupt the rural character, as T2R is specifically designed to
preserve the rural character of Beaufort County.”
Standard 7 — Logical and orderly development
pattern
THE STANDARD
The proposed amendment: “Would result in a logical and
orderly development pattern.”
THE ANSWER, APPLIED TO T2 RURAL
“Yes. The Comprehensive Plan designates the future land use
of the property as ‘Rural’ and any development will be
required to meet the standards of the T2R zone, which is
specifically designed to maintain the rural character of
Beaufort County.”
It Is Important To Note: In each case the Planning Director’s response is not an answer to the standard asked — whether the resulting district is compatible with surrounding uses, whether it
would adversely impact nearby lands, or whether it would produce a logical and orderly development pattern.
It is an ideological statement that the overlay boundary should not move.
Page 107 of 172
Standards 3, 8 and 9 — Predetermined Outcomes
In each of these three, the Staff Recommendation states the opposite of the Staff Report’s own analysis.
THE STANDARD WHAT THE STAFF REPORT’S ANALYSIS SAYS WHAT THE STAFF RECOMMENDATION SAYS THE ANSWER, APPLIED TO T2 RURAL
Standard 3 — Demonstrated
community need
“Addresses a demonstrated community need.”
“This proposed zoning map amendment does
not address any known community need.”
“is in direct conflict with the
demonstrated needs of the
community which led to the
creation of the CPO”
“Not applicable. This standard is directed at applications
proposing a development that would provide a service for
which a community need can be demonstrated. The
requested amendment proposes no development; the
question is not applicable to the requested amendment.”
Standard 8 — Natural
environment
“Would not result in adverse impacts on the natural
environment — including, but not limited to, water, air,
noise, storm water management, wildlife, vegetation,
wetlands, and the natural functioning of the
environment.”
“Any future development would need to meet
the County’s natural resources protection and
stormwater requirements regardless of the
zoning of the property.”
“… will likely have an adverse
impact on the natural
environment…”
“Any development on the site would be required to adhere
to the natural resource protection, tree protection, wetland
protection, and stormwater standards in the Community
Development Code and the Stormwater BMP Manual.”
Standard 9 — Public facilities
“Would result in development that is adequately served
by public facilities (e.g., streets, potable water,
sewerage, stormwater management, solid waste
collection and disposal, schools, parks, police, and fire
and emergency medical facilities).”
“The proposed change in zoning is not anticipated
to have significant adverse impacts on the
provision of solid waste collection and disposal,
schools, parks, police, and emergency facilities.”
“… will likely result in increased
strain and stress on public
facilities.”
“Yes. The requested amendment authorizes no
development and creates no demand for public facilities.
T2R is a low intensity rural district, and the adequacy of
public facilities for any future development would be
reviewed at that time.”
In all three, what the Staff Recommendation states is CONTRARY to the “analysis” stated in the Staff Report.
Page 108 of 172
Next to a Developed Neighborhood — Surrounded by Nothing
Surrounding zoning is T2R. The requested amendment keeps it T2R.
Page 109 of 172
Our Request …
“the primary threat to the long-term viability of Beaufort
County’s Gullah/Geechee communities is land
development. Implementing land use policies that
concentrate growth in urban areas and protect rural land
from suburban development are the most important
actions the County can take to protect its unique
Gullah/Geechee heritage.””
“The T2 Rural Zone implements the Comprehensive Plan goals of
preserving the rural character of portions of Beaufort County.”
CDC § 3.2.40(A)
Page 110 of 172
Why?
Page 111 of 172
Why?
Page 112 of 172
Text Amendment Application?
Staff Report?
Planning Commission?
County Council?
Why?
Page 113 of 172
Why?
“ A new 12-hole golf course…”
Page 114 of 172
xxx
Why?
Page 115 of 172
Why?
Page 116 of 172
Principles
Page 117 of 172
PRINCIPLES
COUNTY MISSION STATEMENT
“Beaufort County government exists to
serve the people of Beaufort County in a
cost-effective manner, so all our citizens
may enjoy and appreciate a protected
quality of life… a diverse heritage, and
economic well-being.”
Adopted 02/12/96.
When decisions are difficult, we return to principles.
Page 118 of 172
2021…5 YEARS AGO
Page 119 of 172
2022…4 YEARS AGO
Page 120 of 172
2022…4 YEARS AGO
Page 121 of 172
2022 – 4 YEARS AGO
“We work to protect the health of the natural resources
of the South Carolina coastal plain and ensure a high
quality of life for all of the people who live in and love this
special place.
This future includes smart, sustainable, economic growth
that maximizes the potential of our community. This
future ensures the availability of natural resources and
opportunity for our children to enjoy those resources.”
https://coastalconservationleague.org/about-us/
Page 122 of 172
A DECISION WAS MADE
OR
Page 123 of 172
A DECISION WAS MADE
Page 124 of 172
RINSE AND REPEAT
Page 125 of 172
A DECISION TO EXECUTE THE PLAYBOOK
“We concluded that individuals and
communities do not adopt and discard
narratives easily or quickly. They are
deeply ingrained, subconscious, durable
and interwoven. Instead of introducing
new “stories,” as some reformers have
suggested, we found it was more
effective to reframe conservation
efforts so they are consistent with
long-standing narratives.”
(p. 221-222)
Page 126 of 172
Development has St. Helena residents worried.
'We don't want to become another Hilton Head'
BY KARL PUC iKIETT
Rave We Learned Nothing?
KcerptS lrom
ChMge /,n rhe S I$ nd$ "NowlltN 10 Lay DoloWI W ry H
•N tional Geograpt,11:. Dctoltmbar 1087
�,a..,.�..,'flll'.., -o,."',.!""..,. .... �
• h
I
nstand$
her
grandpa limit
o in
DON"r LET HISTORY REPEA.TI
Uphold CPO Zoning on St. Belen
I
•
d
n
r:
ground to
,
al.lerin' n ry bones . .,
for Co nt Coun ii
oo Ribaut Rd.
6126123 @5PM
WWW.PROTECTSTBELENLCOM
Page 127 of 172
JANUARY 3, 2023
JANUARY 9, 2023
Page 128 of 172
COUNTY COUNCIL WAS INNUNDATED WITH MISINFORMATION
Page 129 of 172
THE RULES WERE CHANGED DENIALS… based on those rules
DENIED
DENIED
DENIED
DENIED DENIED DENIED
Page 130 of 172
WHY ARE WE HERE TONIGHT? TO REMOVE THE CPO
Page 131 of 172
AND TO TELL COUNTY COUNCIL AND THE PUBLIC WHY
Based on PUBLIC POLICY and LEGISLATIVE FINDINGS the Planning and Zoning Department has
stated that any changes to the boundaries Cultural Protection “erodes the effectiveness of the
CPO by allowing the very uses that have been identified as posing the greatest threat to the
character and stability of the island community.”
Page 132 of 172
THE RULES
The Planning and Zoning Department points to the introduction of “land uses which have
been identified as posing the greatest threat” to St. Helena Island as a negative “response” to
every factor of a rezoning test…
Page 133 of 172
THE QUESTIONS:
Questions:
1. What are those land uses that would be introduced?
2. Who identified them?
3. How were they identified?
4. How do they pose the greatest threat?
5. Where is this information located?
Page 134 of 172
THE ANSWERS ?
Page 135 of 172
THE ANSWERS ?
Answers:
Q: What are those land uses that would be introduced?
A: Gated Communities, Golf Courses and Resorts
Q: Who identified them?
A: The United States Department of the Interior:
National Park Service
Q: How were they identified?
A: Through their Low Country Environmental Impact
Statement
Q: How do they pose the greatest threat?
A (?): ”Displacement of Gullah Geechee people” ,
“skyrocketing property taxes” , ”loss of culture” ….
Q: Where is this information located?
A: In the “National Park Service Low Country Gullah
Culture: Special Resource Study and Final
Environmental Impact Statement”
Page 136 of 172
led thi d
IL B
D. Use Limitations. The foll07Ning specific uses Me deemed to be incompatible with the CPO
2,oae; and therefore, are prohibited: Based upon the Purpose statement above, and in particular
the National Park Service's Low Country Gullah Cu1ture: Special Resource Studv & Final
Environmental Impart Statement, Beaufort County finds that golf courses, resorts, fences,
beachfront d.evelo2ment, boat landings, marinas, and the coastal population explosion are all
encroaching upon and in some cases overtaking Gullah/Gl•cche(' Culture, it is the.J2ublk policy
of B<.�aufort County to protect St. Hdena 1s1and's rural, historic, and cultura] heritage by
prohibiting the following uses which are deemed to be incompatible with the Cultural
Protection Ovl•rlay District:
Restricted Access (Gated Communities) An intentionally designed, secared bm.mded
area wKh desigF1,ated afld landscafled perimeters, aStJ:ally walled or ff!flced, tfr.at are
desigF1,ed to prevem access by flOfl residems. A residential neighborhood where
accessibility is controlled by means of a gate, guard, barrier, or other similar
improvement for the purposes of controllin the movement of traffi - and nconle ·nto
and out of U1e neighborhood and usuallv include common areas, amenities such as
swimming pools, clubhouses, restaurants which are open onlv to residents, property
owners, members and guests.
Resort This use includes lodging that serves as a destination point for visitors and
designed with some combination of recreation uses or natural areas. Typical types of
activities and facilities include marinas, beaches, pools, tennis, golf, equestrian,
restaurants, shops, and the like. This restriction does not apply to ecotourism or its
associated lodging.
Golf Course This l¾Se meltides Pegulatiofl aHd par trace golf eoarses having nifle or
H10re holes. An area of land with improvements to the grounds on which the sport of
golf is played. It typically consists of a series of holes, each consisting of a tee box, a
fairwav, the rough and other hazards, and/or a green with a cvlindrical hole in the
ground, known as a CUJ2, Golf course accessorv uses may include a clubhouse,
restrooms, driving range, and shelters.
Page 137 of 172
FINAL CPO MEETING BEFORE COUNCIL CHANGED THE LAW - 3/21/23
1
Page 138 of 172
Preservation of Religious Places: The “Greatest Concern”
Page 139 of 172
2
FINAL CPO MEETING BEFORE COUNCIL CHANGED THE LAW - 3/21/23
Page 140 of 172
3
FINAL CPO MEETING BEFORE COUNCIL CHANGED THE LAW - 3/21/23
Page 141 of 172
4
FINAL CPO MEETING BEFORE COUNCIL CHANGED THE LAW - 3/21/23
Page 142 of 172
And That’s How it Went
Page 143 of 172
And That’s How it Went
Page 144 of 172
MANIPULATION OF FEDERAL DOCUMENTS:
Putting Beaufort County Staff At Risk
Page 145 of 172
MANIPULATION OF FEDERAL DOCUMENTS:
Putting Beaufort County Councilmembers At Risk
Page 146 of 172
MANIPULATION OF FEDERAL DOCUMENTS:
Putting Beaufort County Councilmembers At Risk
Page 147 of 172
OBVIOUSL Y , A GOLF COURSE DOES NOT “WIPE OUT” A CUL TURE
Page 148 of 172
OBVIOUSL Y , A GOLF COURSE DOES NOT “WIPE OUT” A CUL TURE
Page 149 of 172
OBVIOUSL Y , A GOLF COURSE DOES NOT “WIPE OUT” A CUL TURE
Page 150 of 172
YET , THEY CONTINUED PUSHING THE MANUFACTURED NARRATIVE
Page 151 of 172
YET , THEY CONTINUED PUSHING THE MANUFACTURED NARRATIVE
Page 152 of 172
PEOPLE SHOWED
TREMENDOUS COURAGE…
THE RESUL T?
PROMPTL Y CANCELLED
“The general sentiment
of the community has
largely been driven by
paternalistic third
parties, that have failed
to (or intentionally not)
share the entire story.”
Vice-Chair of the CPO Committee
Page 153 of 172
COUNCIL MEMBERS SHOWED COURAGE…
AND WERE PROMPTL Y THREATENED
Page 154 of 172
FOUR YEARS OF EVERYONES TIME… BASED ON LIES
Page 155 of 172
WHY?
Page 156 of 172
YOU ARE THEIR BUSINESS MODEL.
The Taxpayer Pays…Special Interest Groups Collect
COASTAL CONSERVATION LEAGUE
$21M+ in assets
Total assets (FY2025 990:
$21,396,037)
No offers to buy Pine Island.
$7M+ revenue/year
75% revenue coming from
donations – directly linked to
ongoing land use disputes such
as Pine Island
$232,931 Executive Director Total Pay
$0
invested in St. Helena, per CCL’s
own reports
SC ENVIRONMENTAL LAW PROJECT
6 → 20 Increase in total employees
$128K → $216K Increase in SCELP Director’s total
pay
$0.8M → $3.5M
Increase in public donations and
contributions
$0
invested in St. Helena shown in
SCELP’s filings
Sources: CCL & SCELP IRS Form 990s via ProPublica (2018–2025); CCL Impact Report FY2022-23 p.4.
Page 157 of 172
PEOPLE AS THE
FUNDRAISING
STRATEGY
Instagram posts by @protectsthelena, @scelp_org and
@conservationleague, 2023–2026, shown as posted
Page 158 of 172
“CULTURE”
SELLS THE CAUSE
Instagram posts by @protectsthelena, @scelp_org and
@conservationleague, 2023–2026, shown as posted
(photos cropped, captions excerpted). Post URLs in
notes.
Page 159 of 172
YOU ARE THEIR BUSINESS MODEL
Page 160 of 172
IN THEIR OWN WORDS
CCL Impact Report, FY2022-23
p.4, “By the Numbers”: 250 Protect St. Helena
yard signs. The report’s only St. Helena figure.
p.5, “Your Gifts Make a Difference”: the
Protect St. Helena section credits donor gifts
for the CPO language and the Pine Island
rezoning denial.
CCL Impact Report FY2022-23, pp.4–5 (Issuu)
YOU ARE THEIR BUSINESS MODEL
IN THEIR OWN WORDS
SCELP email to supporters, Dec
11, 2025
Pine Island and Queen Quet lead
the message.
“Our Long-Standing partners”
“defend the CPO in public
hearings and in courtrooms” —
next to a “Support Our Work”
button and a year-end gift ask.
Source: SCELP e-news, Dec 11, 2025
@scelp_org · May 7, 2025
“Donate… matched… to protect beloved
places like Pine Island”
Page 161 of 172
IN THEIR OWN WORDS
Affidavit of Robert Michael New
“I was also heavily involved in developing oppositional strategy…”
“In addition, I provided critical financial support for the community
outreach efforts…”
Photo Credit: Tony Kukulich – Post and Courier
Page 162 of 172
PINE ISLAND WEBSITES… WITH DONATION BUTTONS… ST. HELENA RECEIVES NOTHING.
COASTAL CONSERVATION LEAGUE
coastalconservationleague.org/projects/pine-island-st-helena/
“GIVE NOW” (top of page)
“GIVE NOW” (page footer)
SC ENVIRONMENTAL LAW PROJECT (SCELP)
scelp.org/cases/pine-island
“Support Our Work” (Pine Island intro box)
“DONATE” (top of page)
Page 163 of 172
DID ST . HELENA’S INVIT ATION TO THE
GALA GET LOST IN THE MAIL?
Page 164 of 172
What is their “Preferred Outcome”?
“conservation easements…do not address the plight of landless
Gullah/Geechee people. ”
Page 165 of 172
WHY ARE WE HERE TONIGHT? TO REMOVE THE CPO
Page 166 of 172
WHY ARE WE HERE TONIGHT? BECAUSE A DECISION WAS MADE
OR
Page 167 of 172
OUR TEAM ST ANDS BY OUR DECISION
Page 168 of 172
COUNTY MISSION STATEMENT
“Beaufort County government exists to serve the people
of Beaufort County in a cost-effective manner, so all our
citizens may enjoy and appreciate a protected quality of
life… a diverse heritage, and economic well-being.”
When decisions are difficult, we return to principles.
CODE OF ETHICS – ETHICAL PRINCIPLES
“Promote decisions which only benefit the public interest.”
“Keep all funds and other properties of Beaufort County safe.”
“…promptly dispose of the business of the County.”
“Evaluate all decisions so the best service or product is obtained
at a minimal cost without sacrificing quality fiscal responsibility.”
COUNTY COUNCIL HAS A CHOICE
Page 169 of 172
WHY ARE WE HERE TONIGHT? TO REMOVE THE CPO
Page 170 of 172
JL F B
D. Use Limitations. The follo,,ving specific uses tlfe deemed to be iflcompatible with the CPO
zone; and therefore, are prohibited: Based upon the Purpose statement above, and in particular
the National Park Service's Low Country Gullah Culture: Special Resource Studv & Final
Environmental Impact Statement, Beaufort County finds that golf courses, resorts, fonces,
bcachfront develo_l?mcnt, boat landings, marinas, and the coastal population explosion are all
encroaching upon and in some cases overtaking Gullah/Gecchee Culture, it is the;2ublk policy
of B<.•aufort County to protect St. H<.•lena Island's rural, historic, and cultural heritage by
prohibiting the following uses which are deemed to be.� incompatible with the Cultural
Protection Owrlay District:
Restricted Access (Gated Communities) An intentionally designed, secured emmded
area wl-th desigRatea. ana. landscaped perimeters, usually walled er feftced, that are
desigRed to pre-vent access ey FtBFt residents. A residential neighborhood where
accessibility is controlled bv means of a gate, guard, barrier, or other similar
improvement for the purposes of conlrolling the movement of traffic and people into
and out of the neighborhood and usually include common areas, amenities such as
swimming pools, clubhouses, restaurants which are open only to residents, property
owners, members and guests.
Resort This use includes lodging that serves as a destination point for visitors and
designed with some combination of recreation uses or natural areas. Typical types of
activities and facilities include marinas, beaches, pools, tennis, golf, equestrian,
restaurants, shops, and the like. This restriction does not apply to ecotourism or its
associated lodging.
Golf Course This ase mch:t:Eles regalation and par three goY courses having nin:e Bf'
ffl0f'e hales. An area of land with improvements to the grounds on which the sport of
golf is played. It txpically consists of a series of holes, each consisting: of a tee box, a
fairwav, the rough and other hazards, and/or a green with a cvlindrical hole in lhe
ground, known as a cup. Golf course accessorv USl'S may include a clubhouse,
restrooms, driving range, and shelters.
Page 171 of 172
It Should Never Go This Way Again
Applicant Request: Forward The ZMA to Council With No Recommendation
Page 172 of 172
Source: Beaufort County website. First collected Nov 20, 2026.