Planning Commission Meeting — Minutes
Lancaster County · Lancaster County · Planning Commission · meeting of Feb 18, 2025 · Minutes
Open the original document More from Lancaster County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MEMBERS OF LANCASTER COUNTY PLANNING COMMISSION
JASON CAVALIER , DISTRICT 1
, DISTRICT 2
LYNETTE HINSON , DISTRICT 3
JUDIANNA TINKLENBERG , DISTRICT 4
MICHELLE RICHARDS , DISTRICT 5
SHEILA HINSON , DISTRICT 6
FRANCES LIU, DISTRICT 7
SECRETARY : AIMEE SHOLAR
MINUTES
Lancaster County Planning Commission
February 18, 2025, 6:00 p.m.
Secretary Aimee Sholar called the meeting to order at 6:00 p.m.
1. ROLL CALL: Quorum is present (6 Commissioners)
Commissioners Present:
Jason Cavalier, Dist. 1 Judianna Tinklenberg, Dist. 4
, District 2 Michelle Richards, Dist. 5
Lynette Hinson, District 3 Sheila Hinson, Dist. 6
Frances Liu, Dist. 7
Absent: 0
Staff Present:
Allison Hardin, Development Services Director
April Williams, Planning Director
Matthew Blaszyk, Planner
Jennifer Bryan, Planning Technician Administrative Assistant Aimee Sholar
The following press were notified of the meeting by email in accordance with the
Freedom of Information Act: The Lancaster News, Kershaw News Era, The Rock Hill
Herald, The Fort Mill Times, Cable News 2, Channel 9, and the local Government
Channel. The agenda was also posted in the lobby of the County Administration
Building for the required length of time and was published on the county website.
THE FOLLOWING IS A SUMMARY OF PROCEEDINGS. IT IS NOT A VERBATIM
TRANSCRIPT.
a. Election of Officers:
Shelly Richards made a Motion to Open the Floor for Chair Person; 2nd by Sheila Hinson.
Jason Cavalier was nominated by Sheila Hinson; 2nd by Shelly Richards.
No other nominations were offered. Shelly Richards made a Motion to Close the Floor
for Chair Person nominations; 2
nd by Sheila Hinson.
Vote: 6:0 Jason Cavalier elected as Chair of the Planning Commission
Jason Cavalier made a Motion to Open the Floor for Vice-Chair nominations; 2
nd by
Judianna Tinklenberg 2nd. Motion approved unanimously.
Shelly Richards was nominated by Sheila Hinson for Vice Chair; 2nd by Judianna
Tinklenberg. No other nominations were offered. Judianna Tinklenberg made a Motion to
Close the Floor for Vice Chair Person nomination; 2nd by Lynette Hinson.
Vote: 6:0. Shelly Richards elected as Vice-chair of the Planning Commission
2. APPROVE AGENDA
Chair Jason Cavalier called for a motion to approve the Agenda.
Motion to Approve by Shelly Richards; 2nd by Judianna Tinklenberg
Called vote: 5:1. Motion approved unanimously.
3. APPROVE MINUTES
a. December 17, 2024 Regular Minutes
Chair Jason Cavalier called for a motion to approve December 17, 2024 Regular
Minutes as written. Motion to Approve by Judianna Tinklenberg; 2
nd by Shelly
Richards.
Called vote: 6:0. Motion approved unanimously.
b. January 9, 2025 Workshop Minutes
Chair Jason Cavalier called for a motion to approve January 9, 2025 Workshop
Minutes as written. Motion to Approve by Judianna Tinklenberg; 2
nd by Shelly
Richards.
Called vote: 4:2. Motion approved unanimously.
c. February 6, 2025 Workshop Minutes
Chair Jason Cavalier called for a motion to approve February 6, 2025 Workshop
Minutes as written. Motion to Approve by Shelly Richards; 2
nd by Lynette Hinson.
Called vote: 6:0. Motion approved unanimously.
4. CITIZEN’S COMMENTS [see Sign-In sheet attached]
Chair Jason Cavalier opened the floor to comments from the public. None Signed in.
Floor is closed.
5. OLD BUSINESS: Items from Previous Agendas
a. TA-2024-2368: Thomas Retreat Center
(Discussion Continued from December 17, 2024) Application by Adam Thomas for a
text amendment, creating a new use definition and regulations for “Retreat Center” in
the Lancaster County Unified Development Ordinance.
Staff Presentation: Allison Hardin, Development Services Director presented the
application consistent with the staff report. Staff Recommendations:
Frances Liu Recused herself for this item
There was a 2:00 Minute Recess: Jason Cavalier called for a Motion for a Recess.
Shelly Richards Made the Motion for a Recess and Judianna Tinklenberg 2
nd The Motion
for a Recess.
Vote: 5:0. Meeting is in recess
____
Jason Cavalier called for a Motion to reconvene.
Judianna Tinklenberg made a Motion to reconvene; 2
nd by Shelly Richards.
Vote: 5:0 Meeting is reconvened.
Comment from applicant(s):
Adam Thomas: After receiving feedback from planning and planning
commissioners, we spent a year praying and meeting with other counties
surrounding Lancaster with other non-profits, and having discussions with our
general contractor Chad Catledge with Perception Builders. Out of all these
discussions we settled on a land use that is not currently in the UDO. We feel like
this will be a win/win for the county and the community.
This land use doesn’t add strain to the school systems, it has minimal
infrastructure requirements, and it allows us to keep the ambiance and the beauty
of the farmland and AR pretty much intact. The retreat center was based on
religious retreat, but for other land others there could be a different type of retreat.
Maybe it’s a restoration retreat or a rehabilitation retreat or a physical therapy
retreat. There are plenty of equestrian centers as retreats for children or
individuals with neurological issues and disorders. So, we are trying to create [a
definition] that you can implement down the road as future use in the UDO.
Questions from Commissioners:
Shelly Richards : from the comments you made, I assume they are going to have access
to the rest of the acreage around the retreat center?
Adam Thomas: No, they would be confined and fenced in.
Public Hearing: (See attachments: Sign-in Sheets) No one signed in.
Chair Jason Cavalier closed public hearing and called for a motion on item
TA-2024-2368.
Motion to Approve by Sheila Hinson; 2
nd by Judianna Tinklenberg.
Discussion:
Allison Hardin: There are two thoughts on where the parking should go. Staff
recommended one spot, and the applicant recommended another. And we added a lot of
definitions. If you have a motion you would need to say as amended and then make a
recommendation on the buffer, if there is a buffer and what type and what the parking
requirements would be. [ See attachments: Draft Ordinance Applicant Version and
Draft Ordinance PC Version]
Sheila Hinson withdraws her Motion to Approve; 2
nd by Judianna Tinklenberg.
Sheila Hinson made a Motion to Approve with the Recommendations stated by Staff; 2
nd
by and Lynette Hinson.
SEE ATTACHMENT: DRAFT RETREAT CENTER ORDINANCE 2025-1948 PC
VERSION for stated staff recommendations.
Called vote: 5:0. Motion is approved. (Liu Recused)
Chair stated the item will go to County Counsil for consideration, and applicant will be
notified of time and date.
b. RZ-2024-0859: Blackhall/Waxhaw Highway
(January Agenda) Application by Justin Blackhall/Blackhall Acquisitions to rezone
39.04 acres located at 6872 Waxhaw Highway (TM 0015-00-059.00) from Rural
Neighborhood (RN) to General Business (GB) District in order to develop as mixed
commercial property.
Staff Presentation: Matthew Blaszyk, Planner, presented the application consistent with
the staff report. Staff Recommendation: Approval.
Questions to staff:
Judianna Tinklenberg : Any phone calls or inquiries from the public?
Blaszyk : There has been 1 inquiry, but it was just an information request about the sign.
Comment from applicant(s):
Justin Blackhall : I will use my time to ask for any questions from the
commissioners. I hope you can see that the application fits the macro goals and
fits the overall goals of the county. This project would pull traffic away from 521,
we are seeking to avoid the influx of people from Waxhaw and from the other
large developments flooding onto 521. This will actively reduce traffic from 521.
The property it is zoned RN and is completely clear having no mature trees, there
are high tension power lines running through it and railroad tracks to the north of
it. It’s got some dilapidated buildings that people kind of use to throw trash in as
they drive by on 75, so it has no real rural feeling. So, I feel that this meets the
micro and macro goals of the county.
Questions from Commissioners:
Frances Liu : The Small Area Plan states that there is GB, Industrial, etc., so if this is
approved would there only be businesses in this area?
Justin Blackhall: The application is for a small business park and so it would align
with the small business plan.
Frances Liu : Is there anything that can be put in there that would align with GB,but not
with the small area plan?
Matthew Blaszyk: No
Chairman Cavalier opened public hearing.
Public Hearing: (See attachments: Sign-in Sheets) No one signed in
Chair Jason Cavalier closed public hearing and called for a motion on item
RZ-2024-0859
Motion to Approve by Frances Liu; 2nd by Lynette Hinson.
Discussion: None
Called vote: 6:0. Motion is approved unanimously.
Chair stated the item will go to County Council for consideration, and applicant will be
notified of time and date.
c. CP-2024-1735 Cresswind Comprehensive Plan Amendment
(January Agenda) Application by Kolter Group Acquisitions LLC to amend the
Comprehensive Plan/Future Land Use Map designation from Rural to Growth Area
for approximately 868.12 acres comprising the following parcels located between
Charlotte Highway and Van Wyck Road: TM #s 0019-00-007.02, 0016-00-066.01,
0019-00-018.00, 0019-00-023.01, p/o 0019-00-019.00, p/o 0015-00-047.00, 0016-00-
065.00, 0016-00-065.01, 0019-00-019.02, p/o 0020-00-001.00, 0019-00-007.00.
ALL CRESSWIND ITEMS WILL BE PRESENTED AS ONE. SEPARATE
PUBLIC HEARINGS AND VOTES WILL BE HELD FOR EACH ITEM
Staff Presentation: April Williams, Planning Director presented the application consistent
with the staff report. Staff Recommendations: Denial of Comprehensive Amendment.
Questions to staff: None
Comment from applicant(s): Emily Powell with Kolter Homes, Amy Massey McKinley
Horn, and Matt Mandal with ESP Associates
Amy Massey : We are a private regional company. This project is age restricted, we also
have some age targeted communities and those would be smaller communities with fewer
homes. Our goal is to facilitate a lifestyle. [The Plan includes a] Mix of lot sizes, private
streets. HUD definition of “age-restricted” means 55 and older. We must track and share
HOA documents that show there are no children in the home. It requires board approved
1 ½ year leases. We are requesting 853 homes; since not all homeowners work, trips are
spread over more hours not just peak hours, which means a lower number of trips. There
will be more than 400 local volunteers for the community. There will be less people in
the homes, which means they will use less use from a water and sewer perspective as a
traditional home buyer would. From a public safety and ambulance trips a couple items to
note, it’s broken down by brackets and a 55-74 year old produces similar trips from an
18-44 year old and our average person is 68 years old. Our clients have a very active
lifestyle, so they are moving there for those amenities they are moving there to be active
in their community. We have a person in the community who plans events, and we have
won several awards for these events. There are always events in the club house and even
on the green lawn this lifestyle is huge and this is why someone would move into this
community and why they would want to live here. This is an example of one of our
communities [picture on screen] we opened in Charlotte there are two facilities with 3
different lot sizes. We would do the same community here in Lancaster with green lawns,
tennis courts, and pools our clients tend to recreate in their own community than going
out into other areas of the community.
Matt Mandel: Several master plan communities [nearby] are age restricted similar to what
is being proposed with Cresswind. A big portion of this site is zoned RN, a portion is
zoned LDR. I do want to point out that those densities under those districts by right
today, the LDR permits 1.5 units an acre and RN permits 1 unit per acre and our site plan
is currently showing about 1 unit per acre. So, consistent with those zoning densities. The
comprehensive land use plan, I know staff talked about it in their report, I know this
document is new and it’s a living document, we feel that there are some statements in
here that we are addressing and are consistent with, one thing I want to point out is that
future land use is intended to be a guide as to a general direction to go in, but as the
county continues to grow and circumstances change it is imperative that the county
continue to review and update this document. With our plan we hit a lot of what the
county already wants with our application, a portion is are already in the growth area.
So, the comprehensive plan change for this site is only for 384 acres. In order for these to
follow suit with the master plan a community like this will help encourage those
components of the master plan and comprehensive land use plan. The proposed zoning is
consistent with current zoning. We would provide connections to SC 521 from Van
Wyck Rd with construction of this property. There are 3 different lot sizes 55, 65 and 75
wide lots. Lots of green spaces and lots of activities. There will be over 400 acres of open
space between natural open space, tree save areas and buffers and wetlands. We will
design around the wetlands. We have had community meetings and provided feedback.
There will also be access to Laney Road.
Emily Powell: [Regarding] the rezoning from GB which is located along 521 and the
INS. There is a high level of impact fees per Lancaster regulation. We have [agreed to]
the solid waste fund and the library fund in the DA; there is also a fee to Lancaster Water
and Sewer District. We ask for no school impact fees because we can verify that we will
have no children. We propose to amend the DA to match the verbiage in the county
documents regarding the school fees and would do our own study verifying that and
submit that to the county. We would modify the DA term to 10 years to match the noted
preference, the school district payment, we would modify the language matching
Lancaster County school impact fee ordinance stating that we would request relief from
the ordinance by doing our own individual assessment study. There was a TIA and
phasing, we would have to get into that when we got the certificate of occupancy,
phasing would then have to be finalized. The last item was for a roundabout or simply a
straight through intersection. So, we would have to make some modifications to the DA.
Amy Massey: We coordinated with staff and prepared a TIA which matches county, state
and national requirements. That TIA has been reviewed and approved by both DOT and
Staff. These are the improvements that the developer will have to perform, in order of
construction:
• Access number 2 will be the first access point to be constructed. It will have a
stop sign in place first with a stop bar and a southbound or southwest bound left
turn lane on Van Wyck at the access point to move the left turners out of the
traffic flow.
• Next, access number 1, it’s directly. The improvements here are constructing a
north-bound left turn lane on 521 for proposed access number on HWY 521
across from Henry Harris
• reconstructing the existing southbound left turn lane that is already there. Both of
those turn lanes would be offset for safety, constructed into the median so that
there is better site distance for the turns.
• We anticipate a traffic signal to be placed here, which will be a huge
improvement on the Henry Harris side of things. That would need to be approved
by SCDOT based upon a specific study to better analyze whether it warrants that.
In the meantime, there will be a stop sign first until the site is improved and
installed into the development.
• Then there will be a proposed extension through Laney Road which is access
number 3.
Emily Powell: We have been working on this for the better part of two years. We
submitted a sketch plan for 950 homes under a different land use category in late 2023.
We did adjust that to MDR with a cluster which requires a DA, so we are proposing the
853 with some other uses like INT and the GB as they make sense adjacent to 521. We
have gone to our community meeting and are here tonight. We know there are a lot of
people who want to speak, so we will move on, and we are here to answer questions.
Questions from Commissioners:
Judiana Tinklenberg: You mentioned the 3.2 acres [for County Services], but there will
be no money for it just the land?
Amy Massey: In the DA it is listed as land only, but we haven’t yet gauged what
that use would look like, whether it is fire, EMS, police, governmental use. We
are looking for feedback as to what the best use is, we could pad that site and do
utilities with that, but we haven’t had the opportunity to further those
conversations, but we are intending that to be positive for the community.
Shelly Richard: Technically you have an average of 1 unit per acre but it’s because so
much of that property is in- wetlands and flood plains area, and every time it rains it
floods pretty good. You technically have the one acre because everything else is shoved
down to one side because so much of it is undevelopable. You say it’s going to become
an open space but if it constantly floods how is it going to be a usable open space?
Amy Massey: The site is 2/3 upland and 1/3 wet buffer floodplain etc. Of course,
everyone that has driven by 521 has seen that. Yes, there is flood plain and there
are buffers. 2/3 is upland and that is what we are looking at from the development
area perspective. There are a hundred plus acres that are open space perimeters,
etc. aside from that buffering floodplain, there are over 400 acres in common
open space tota1 and again only 1/3 is wet, so there is additional green space
between the rear of all lots, it is hard to see it at this scale. In addition to the rear
setbacks, we have additional green space between the lots. One lot would not
back up to another lot. The east side does have more floodplain, but it’s next to
521and that southern border. You can see in the site plan that is where we have
some commercial and INT, but the majority of that area is floodplain and that’s
why you simply see that road connector for a better part of a mile through there
with limited other developmental use.
Frances Liu: You mentioned that the Blvd was going to be the connector road, which you
said would serve the county. The road between 521and Van Wyck?
Amy Massey: So, the connector road is on I believe both the comp plan and
RFATs plan so we understood that was intended to be developed there the
connector road. So, with our development we are asking for a rezoning; we would
also ask that we would be the developer and the home builder, and then yes, we
would be building that connector road that is shown on future plans.
Frances Liu: What do you think the speed limit would be inside of a development like
that?
Amy Massey: I don’t Know.
Emily Powell: I would say that it would be determined at a future time, probably
somewhere around 35 MPH would be a guess, but it would have to be determined
by a bunch of other factors.
Frances Liu: In most 55 and up communities there are a lot of use of golf carts and
usually the speed limits are about 20 MPH or lower topping out at 25 MPH and I just
wondered if you thought that was suitable connector road. If people would want to turn
off of a 55 MPH road to a 25 MPH connector road and cut through a neighborhood. I am
just wondering if you think it’s a suitable fulfillment of a connector road?
Emily Powell : I will let Amy speak to traffic, but we do not have any lots
fronting to this. It’s not where you will have driveways accessing off the
boulevard. The boulevard is intended to provide connectivity, and we specifically
designed the site plan to ensure there was no driveway access. As Matt mentioned
earlier, we understood comments and concerns about Laney Road, so we have
done the same thing for Laney Road and we continue to evaluate how to make
Laney a smoother transition.
Frances Liu: And you propose donating this road [to the County]?
Emily Powell: So, the collector road we would develop and construct. We would
propose to donate it the same process that Roselyn is developing and donating
their collector road.
Frances Liu: Donating, meaning you are no longer responsible for it after it’s built?
Emily Powell: Yes
Jason Cavalier: [Asks to see floodplain slide.] I see 30’s, 40’s and it looks like it is close
to the central location where the largest wetland area-I don’t see any buffers called out
for that.
Emily Powell : Not every buffer is labeled just for the sake of visual but there
should be buffers on all, we are requiring 30ft or 50ft or 40ft based on what type it
is so, there are buffers on all of them, I am not sure on what specific area you are
talking about, but again we did not label all of them just for visual sake.
Jason Cavalier: Ok thank you, I see the line, I just wanted to get more clarity on that.
Chairman Cavalier opened public hearing.
Public Hearing: (See attachments: Sign-in Sheets)
1. David Kitchen (Indian Land): My family has lived in Lancaster for over 125
years. Great grandfather he helped build the Osceola Methodist church, our land
is one of the properties involved in the proposed land development. As a family
the Richardson family decided to try to do something good for the community
with the property. I do support what Cresswind wants to do. Thank you.
2. Marie Broome (Lancaster): Grew up in the area of Laney Road where my
grandfather owned much of the property that was there. We owned 2 properties
on Laney Road, and it butts up to this development. Opposed to the Cresswind
proposal:
• it will disrupt our life as we have known it as we grew up knowing our
“friendship house”, it allows for fellowship and foundational growth for many
other people in our community.
• We have very little left in our community here in Indian Land that allows us
to remember the things of the past.
• The traffic continues to grow, it’s going to continue to grow
• Emergency services, EMS and in the coroner’s office [will be impacted]
• The speed limit will not be followed
3. Logan Hedges (Van Wyck): That little corner up there I am trying to keep green.
Unlike our wonderful developers here tonight, I actually reside in Lancaster
County. Opposes Cresswind proposal:
• concerns with traffic
• noise and disruption of rural living
• I am an ER nurse by trade. I have performed CPR more times than I can
recall. I have waded through Covid the whole nine yards and came out the
other side. I am here as a private citizen. We do not have sufficient medical
resources for our existing community.
• [Emergency response] wait times are often long. Those needing hospital
admissions can often wait over 24 hours for post diagnosis in the ER for a
hospital bed.
• Emergency departments whether ten or fifty beds operate frequently on only
10 to 20 percent of normal capacity because the admission holds waiting and
the ER areas are waiting for a room. This results in prolonged waiting room
stays sometimes in excess of 24 hours. These conditions place our community
at risk. Planned health care expansion for this area already is estimated to be
insufficient for this current population.
• Outside the hospital EMS crews are equally strained and in some areas the
strain prevents discharged patients from mobility issues to be taken home and
further slowing up admissions.
• Long-term care and assisted living facilities also have long wait times for
admissions and we haven’t even hit another pandemic yet.
• There are over 7,000 approved homes for Lancaster County that have not been
completed. Do we really need another 800 plus?
• Another 55 plus community like proposed presents the highest toll on our
health care services.
Our resources simply cannot support this development. I implore this council to
hit the brakes literally on this proposed change through zoning. Follow our
existing plan. Higher tax revenues do not equal a better community, and I hope
that we focus on improving the health of our existing community first.
4. Mike Mosley (Van Wyck): I too respectfully oppose the request by Kolter Group
to develop this property:
• traffic in that area, not just on Van Wyck Road but on 521 as well it’s just
atrocious at times.
• Age 55-plus and it will have an impact not only on the infrastructure but also
EMS. They are spread paper thin, and I share those concerns.
• primarily my concern is I know the cost of making this right. In order to
improve the infrastructure, you need to improve the utilities, the EMS that we
need or again the hospital impact that was just previously spoken of. I am not
opposed to progress, but I am opposed to adding additional burden to the
people that live in this county, especially those with fixed incomes.
5. Colin Dilson (Lancaster): We previously lived up in Indian Land for 19 years we
bought one of the parcels that is proposed for this development 21 years ago at
that time you could lay down and take a nap on 521 HWY when we bought it.
The only constant thing we have had since then is change. We have been overrun
and since Covid we are getting more and more people moving here from other
states. My family was here in Van Wyck with the Revolutionary War, but we
were on the wrong side. In these 20 years we have had people wanting to
purchase this land and all sorts of things. We have had strip mall proposals, we
have had storage unit proposals, all sorts of what I wouldn’t put in my
neighborhood, and I wouldn’t put it in someone else’s neighborhood. We have
had other developers, but they folded their cards and gone away because they just
couldn’t get their acts together. This is the best plan I have seen in years, and I am
impressed with it, and I know they have worked hard with the planning. I hope
that you do consider it, and I hope that it is as positive as I think it is going to be.
6. Pat Benz (Fort Mill): Good evening chairman and vice chairman and members of
the planning board. I am here to represent the concerns about the Kolter Group
applications for the proposed Cresswind 55 and older community. Opposes
Cresswind proposal due to concerns:
• Per Lancaster County 2040 comprehensive the population growth in Lancaster
County has increased by 57 percent from 2000 to 2020. The population
growth in the panhandle alone increased by 476 percent. This type of growth
is not sustainable as it creates service impacts throughout all districts in
Lancaster County.
• Delays in first responder services including EMS, fire, Sheriff and coroner.
• Gridlock conditions during high commute times in the morning and evening
and the schools are all at compactify.
• In-depth information about the impacts of the proposed Cresswind 55 and
older development on the panhandle and other districts throughout Lancaster
County was obtained from the following: The Lancaster County Website,
Lancaster County Department Responses to Freedom of Information Act
requests, content and presentations from the Lancaster County Civics 101
program, presentations by county council members and first responders’ staff
at different county events and news letters from county council members,
presentations and discussions at Lancaster Counsil meetings, content and
presentations at the Lancaster County Counsil retreat on 2/4/25, The Rockhill
and Fort Mill Area Transportation study which includes the Lancaster
panhandle and the South Carolina Department of Transportation Website.
We are asking the Planning Commission to recommend denial of all of the Kolter
Group applications regarding the request for Cresswind’s 55 and older
community’s Comprehensive Plan Amendment CP-2024-1735, Development
Agreement and the proposed zone changes 2024-1732, 2024-1733, and 2024-
1734.
7. Bruce Cohen (Lancaster): I am presenting information about the impacts of
development on area roads obtained from Lancaster County Development
Website and the DOT Website Department of Transportation.
• In the panhandle 3,800 residential units still to be built that will be a suburb of
Charlotte.
• south of [Highway 5] development 1,860 units still to be built and approved,
also a suburb of Charlotte
• The City of Lancaster, 2,200 units are still to be built and approved and that
will become a suburb of Charlotte.
• Also, major commercial developments we’ve got Costco coming in and I
believe the figure was 2,200 cars coming into the parking lot and coming out
of the parking lot, I believe that was the figure. That is 4,400 more cars
• Costco, Lowes Food Target Center, and a hotel, the place is over saturated.
This morning it took me approximately 15 minutes to get from Shelly Mullis
which I waited for 3 red lights in the traffic to Dolby’s Bridge that’s less than
20 MPH. This comes up to 10,600 more residential units already approved
and that doesn’t include the already 850 by their figures, that’s 1.7 cars per
add the 850 we are almost at 20,000 cars.
I ask that you do not approve this or it will be a parking lot. And it's going to be a
nightmare.
8. Joe Kohler (Indian Land): Opposes the development due to concerns about impact
on Sheriff’s department
• Right now, we have about 147 sworn officers, which is about 43 less than the
national average.
• Our population growth in Lancaster County was about 96,000 in 2020 and is
estimated to be in 2024 just to be over 108,000.
• In 2020 there were just over 65,000 active calls for the sheriff’s department
and in 2024 there were just under 80,000. So, our population went up about 13
percent, but our call volume went up close to 20 percent.
• We have thousands more homes to develop we have Costco, Lowes, Target,
and other businesses coming in that is creating a bigger burden on our
sheriff’s department which is already stretched thin.
• The time it takes for our sworn officers to hit those engagements will only
increase. They can’t get to where they need to be that only decreases their
effectiveness. We are lucky to have Sheriff Faile and the sworn officers. We
are lucky here in Lancaster County that they have always been understaffed
and have performed well but we are really pushing that envelope. It’s only
going to get worse.
• Sheriff Faile is hoping to get another 4 officers for the panhandle area he
needs 10. I was lucky enough to be on the Citizen’s Academy and worked
with the sheriff’s department to understand what it is that they do. We have
great response times in the state compared to national averages. But we are
running them ragged, we do not have the staff, and we are making it worse
because we have all of this development.
I hope you consider denying this application we can’t afford anything new we
need to build what has already been approved and then refocus on our
infrastructure because we are not today.
9. Ken Beck (Sun City):
I have over a dozen years in emergency medicine as a volunteer EMT in New
York, and then a paid EMT, I also worked in a hospital for the Coast Guard for 8
years. I know how critical it could be when you need to be there quickly. I find it
hard to believe in Lancaster County we have 18 fire stations.
Opposed to the development due to impact on Fire services:
• 15 fire stations are fully staffed by volunteers. When fire rescue calls come in
volunteers must first drive to their assigned station and respond from there and
it takes more time.
• There is one fire station in Kershaw and two in the panhandle with full time,
part time and volunteer staff for fire rescue.
• Call volumes continue to increase; not enough county resources to keep up
with the demand.
• In 2024 the estimated population in the panhandle was about 43,000 people
that guideline is 1 fire station for every 10,000 people so there should be four
stations in the panhandle there are currently two.
• In 2024 there were 2,700 plus calls for service including some 750 medical
assistance calls. Fire rescue personnel cannot do the same medical attention as
the paramedics so they may respond first but it’s not going to be the same
level, plus they can’t transport to hospitals.
• All the Lancaster County fire districts are affected when the number of calls it
receives exceeds the number of fire units and then you must use the mutual
aid situations.
• The panhandle has the highest built out 55 and older communities with a total
of 4,755 units. Where we are going now with the Kolter’s Group proposed
development is another 853 homes and would put a further strain on our
already limited fire department as well as police and emergency services
I would like to recommend to the council that you reject this until we get a lot
more in the sheriff’s department, building fire stations we need and getting the
roads built.
We were recently in a meeting with someone from DOT and we asked
them what the plans were for 521 and the person from DOT said there were no
plans for 521. So, we didn’t pass the bond issue and the tax increase and some of
us are wondering why we are asking for all of this money with no plan vs. first
lets get a plan to look at. There are a lot of issues there, especially with DOT
telling us that there is no plan for 521.
10. Mary McCammon (Sun City): I have lived in Indian Land since 2017
Opposed to the development due to impact on emergency services. Here is
data we got from Lancaster County EMS department.
• Their volume of increasing calls from 2023 to 2024 one year was 500 more
calls. It takes them 7 to 12 minutes and 46 percent of those calls go to the
hospital. There are only 2 EMS stations in the panhandle and there are a total
of 6 in the rest of the county.
• There are only 3 ambulances that are assigned 24/7 to the panhandle and 1
ambulance that has 12 hours on
• The rest of the county has 11 ambulances with only 1 that has 12 hours on.
• If we wanted to add another ambulance, back in 2020, they were 400,000
dollars as of 2024 they are 900,000 dollars another half a million dollars just
to add an ambulance.
• We are understaffed with paramedics and EMT’s. We currently have 3 full-
time positions that are not filled. We have 17 part-time positions that are not
filled.
All this cost when you put it all together is just astronomical to try to just get to a
place where we can feel safe as citizens who already live here. Please vote no for
the Kolter Group for right now please.
11. Dr. Ted Matuga (Indian Land): I am a retired doctor, and I have lived here since
2017. Opposed to the development due to impact on medical services, EMS and
Fire by Senior/Over 55 communities:
• [There are] numerous existing 55 and over developments in the panhandle
north of HWY 75 and a new 55 and over being built south of Hwy 5. The
majority of these residents in these developments are in their 60’s, 70’s, 80’s
and 90’s.
• There are a greater amount of EMS calls to service these older populations
than the general populations due to existing medical conditions. Including
medical emergency incidences like heart attacks, strokes and falls.
• All Lancaster County EMS and fire districts are affected when the number of
emergency medical calls exceeds the number of EMS and fire units available
in the panhandle. EMS and fire units from neighboring districts have to be
dispatched to the panhandle leaving other nearby populations vulnerable and
without services thus creating a domino effect throughout the entire county.
• Fire fighters are limited to the type of emergency medical services that they
can perform and cannot transport patients.
• Delayed response times to transport to hospitals negatively impact all patients
whether they live or die.
• Recovery time and likelihood of permanent disability increase.
• Lancaster County EMS and fire departments are already struggling to meet
the current demand; It will be even more challenging to provide emergency
services to the additional thousands of additional residential units already
approved and being built in the panhandle and throughout other districts in
Lancaster County.
The proposed Cresswind 55 plus development consisting of 853 more homes
would further cripple the timely delivery of emergency services throughout the
county. We are asking the Planning Commission to recommend denial of all of
the Kolter Group applications regarding the request for Cresswind’s 55 and older
community’s Comprehensive Plan Amendment CP-2024-1735, Development
Agreement and the proposed zone changes 2024-1732, 2024-1733, and 2024-
1734.
12. Kathy Storm (Lancaster): Opposes the development, speaking to impact on
Coroner’s Office:
• The coroner’s office is on duty 24/7 365 days a year. Many investigations are
ongoing, and some take up to a year to close.
• There is a high level of coordination with the sheriff’s department. The
coroner investigation staff also testifies at criminal court proceedings.
• The coroner training takes an average of two to three years. The national
certification takes an average of 4 years. There are 6 full-time investigator
staff, 5 of which have already obtained the certification. Less than 3 percent of
the coroner offices throughout the State of South Carolina have attained this
level of professional certification
• There are 7 part-time transport staff. Recruitment is still ongoing, but it is
difficult to get people to do that kind of work.
• There is no clerical staff, investigators also must perform these duties 7 days a
week.
• The coroner department caseload continues to increase every year due to the
population growth of Lancaster County especially in the panhandle. Where
the largest number of 55 or older communities are located.
• In 2023 there were 761 coroner cases, 160 administration and notification
cases. In 2024 there were 772 coroner cases, 197 administration and
notification cases.
Thousands more residential units have been approved but have not been built yet.
A new 55 plus development 1,860 homes is now being built in Lancaster County
south of HWY 5 the City of Lancaster is also annexing land and approving new
developments. I really recommend that the Kolter Group be refused.
13. Barbara Scannell (Indian Land): Opposes the development, summarizing the
previous comments.
• We need to look at the impact on all the county districts, as they have
mentioned when emergency calls exceed [one area], they pull from all the
county districts
• roads that are over capacity,
• All first responders are over capacity
• The county Council is facing challenges to fund infrastructure and first
responder services throughout the entire county including expansion of road
capacity, improvements to storm drainage, staffing of existing first responder
departments, building and staffing new EMS stations and fire stations and
purchasing vehicles for EMS, fire, sheriff and coroner.
• delays on 521 even outside of peak times.
• schools are at capacity. We pay for those schools, and they are over capacity
because developers are not required to kick in toward them and that’s going to
be falling back on all of us.
• Medical appointments right now are taking months.
So, all these things together are not just again in the panhandle, this is going to be
happening in all the districts. I am asking the Planning Commission to
recommend denial of all the Kolter Group applications regarding the request for
Cresswind’s 55 and older community’s Comprehensive Plan Amendment CP-
2024-1735, Development Agreement and the proposed zone changes 2024-1732,
2024-1733, and 2024-1734. We don’t have the resources vs. now with what we
have much less than 10,000 more units already approved and on top of that
adding more. This county cannot sustain this development, and we are at risk all
throughout the county. So please consider this to be really important for all of us.
A Motion for a 5 Minute Recess was Made by Jason Cavalier and A Motion to Approve
Recess by Lynette Hinson; 2
nd by Shelly Richards. 6:0 Approved.
A Motion to Continue was Made by Shelly Richards; 2
nd by Lynette Hinson.
6:0 Approved
14. Jeanne McCoy (Sun City): I want to add my voice to this Planning Commission in
saying that I would like you to deny this application for Cresswind. You have
already heard all of the reasons that I also agree with.
15. Sean Corcoran (Van Wyck): I am here as a concerned resident, taxpayer, voter
and I also serve on the Town Council for Van Wyck as our Mayor. I have had
several residents in the area approach me to provide their comments about the
proposed Cresswind development. This development will fall immediately
outside the boundary of Van Wyck and stands to have significant burdens on the
town and county resources and the residents.
• First, this is not an adequate basis for amending the comprehensive plan. Why
are we [considering] an amendment to the plan at this time? This county’s
Comp Plan was just passed in April of last year less than 10 months ago.
Nothing has transpired in this part of the county at that time to justify an
amendment to the plan. Our county planning staff and county residents have
spent significant time and resources to complete the final plan and district
map. The county residents remain in agreement with the current plan and map
and zoning designations. This part of the county is not appropriate nor able to
accept additional residential growth. If this area was able to handle more
growth, the Comp Plan would have designated the area as growth and this
question would not be before you tonight.
• The new state park plan for Van Wyck Road is in conflict with any plan with
neighboring high-density development.
• There is no funding to meet the current demands on our roads and emergency
services. How do we intend to meet the increased investment demands that
this community will present?
• In light of the resent failure of the school bond referendums I fail to see how
passage of the amendment would be anything other than irresponsible. We
need to stop allowing the tail to wag the dog.
• Adequate funding for infrastructure and services must be in place before any
development may proceed.
In the last two years Van Wyck adopted a comprehensive plan and UDO that
restricts subdivisions to a conservation model which preserves open space and
limits the burdens that come with large high-density subdivisions. I suggest you
take a look at our model before deliberating on the Cresswind matter. What is
being proposed tonight is not only irresponsible but also an irresponsible
approach to growth in the panhandle but in congress with what is being done in
Van Wyck. I urge you on behalf of my fellow county residents to not recommend
the proposal to the County Council.
16. Maggie Norris (Lancaster): My point is of concern for lost forest, farmland, and
open space in northern Lancaster County. I too am a resident of Van Wyck and I
too am very proud of the comprehensive plan we have in Van Wyck to preserve
this open space and I would encourage you all to vote against the Kolter plan to
amend your comprehensive plan. It is incongruent with Van Wyck and Lancaster
County.
17. Doug Frick (Waxhaw): My wife and I live on Hwy 75 or right off of it between
Waxhaw and 521. Opposed to new development for the following reasons:
• [Existing] road needs paving
• intersection at 521 at 75 when you get a green light approaching 521 and it
gives you an arrow to turn left and then you must merge into the traffic
coming south on 521 it is so dangerous.
• In the afternoon, left turn from 521 onto 75 to go towards Waxhaw there is
room for about 3 cars and if you have got 10 cars wanting to turn left there
you have got a problem.
• Right above that [northward] is Walnut Creek subdivision. You can get
about 7 or 8 cars in that turn lane.
• There are two turn lanes between Walnut Creek and Van Wyck Road; a
car can get into those but not a vehicle with a trailer behind it.
18. Greg Gregory (Lancaster): I appreciate being able to address you from a different
tack from prior speakers I am president of Builders Supply Company here in
Lancaster which is located a few blocks down the road from here and was
founded in 1908. We are a supplier of building materials for new home builders in
Lancaster County and in Charlotte region we have about 125 employees and
about 75 pieces of rolling stock.
Supports the development for the following reasons:
• I know Kolter to be an excellent builder and developer with a very strong
reputation in this market for building high caliber active adult
communities.
• Cresswind communities which I am familiar with are a great and attractive
brand. I served as a state senator for the county for about 26 years; during
that time, I helped to bring sewer to Indian Land along with the Lancaster
County Water and Sewer District; we knew there was always going to be
growth in Indian Land it’s just the question of the quality or lack thereof
the growth.
• This development would be another high-quality development similar to
Sun City and Tree Tops communities where a lot of your speakers tonight
reside in.
• Where does the funding for growth come from? It comes primarily from
the construction of single-family homes in the county. They are massive
revenue generators. There is 150,000 dollars of building material in a
single-family home that’s going to generate about 3,000 dollars for the
county and about 6,000 dollars for the state just in sales tax not to mention
all of the other fees.
• About half the counties in South Carolina are growing and about half of
them are shrinking. I think that the latter would trade places with the
former in just about any case and welcome this growth.
• [Over 55 communities] are the best type of growth that we could have
because adult communities don’t place any stress on the school district.
It’s a high-density community which reduces sprawl.
• This land is going to be developed eventually regardless of if it’s not
developed in this manner it will be developed, with bigger lots which is
going to push more development down 521because all of this land is going
to be developed out over time.
• About 40 percent of it is set aside to not be developed
And lastly, I would like to refute a lot about what’s been said about growth being
out of control in Lancaster in fact building in Lancaster has declined and it has
declined considerably from 2000-2022 there were an average of 1300 houses built
per year and now it’s down to 700 which is down about 42 percent.
19. Mavis Gauruder (Lancaster): I have never spoken at a meeting before, but I
thought I should have my voice heard on this proposed development Kolter
Group. I am against this community for many reasons:
• The increase in traffic
• The need for EMS services
• over development in Indian Land
• a need for more and better infrastructure.
There is no reason to approve of this development, it certainly will have an impact
on our community in numerous other ways. The need for additional revenue to
build and improve our schools and improve our roads is a pressing concern for
Indian Land. However, I don’t feel the additional revenue from this community
would warrant this approval. Tonight, I heard an income of 4 million dollars, yet a
new ambulance is 900,000 dollars, so I mean these figures are just mind boggling.
Our last election, the bonds for school and road improvements were defeated. I
believe that one of the reasons that they may have been defeated was because of
all these senior communities. Many seniors are on fixed incomes, and they feel
that they don’t want a tax increase for which a bond would mean. And I have
heard that people have commented that they don’t have kids in school, and they
don’t want their taxes to increase. They don’t pay school tax, but they do pay the
money that would be allocated on a bond. So many may have voted against the
bonds and another senior community would negatively impact future possible
bond votes. I have 3 children and grandchildren in the Indian Land School
System, and I have heard firsthand of the overcrowding in the classroom and
shortage of teachers and virtual classes. I think we need to do better for our
children. Overall, I don’t see the benefit of approving this new community and I
would like to go on record as opposed to this development.
20. Sam Beegle (Lancaster): I would like to comment on what was said about the
bond referendums that failed. Me personally I voted against them for the specific
reason that I feel that the county has failed its residents and didn’t properly plan
for all the growth that they previously approved. It became evident to me that the
builders and developers walked away with millions and millions of dollars and
left the taxpayers of the county with the responsibility to fix the mess that was
created. I don’t know who approved it or denied it, to me the finances just don’t
add up. The previous speaker mentioned that this is a great revenue source to pay
for some of these services. But one of two things is that something doesn’t add
up. Either the County is abjectly mismanaging funds, because of the huge amount
of growth that we’ve seen, then we should have over a supply of money. Right, if
we have had all this growth and it’s great because this will more than adequately
fund the services then we should have a ton of extra money. Well clearly, we
don’t, because as noted in the newsletter that was sent out by Stuart Graham
which I appreciate very much. There are several things that he mentions like land
on Harrisburg Road has an approved fire station, but we must find the funding
source. An EMS station at Tree Tops is approved and land is secured but they
don’t have any funding. Fire trucks need to be replaced and are 3 to 4 years out
and again needs to be fixed; full-time fire fighters are needed. So, if growth pays
for all of that then why isn’t it already done? Other things that frustrate me about
all the uncontrolled growth that we don’t have funding for why has this been
allowed? Who’s approving that? The builders are walking away with millions of
dollars and the developers are walking away with millions of dollars we didn’t
make them pay for the increases in the services. So, we the taxpayers can get to
pay for that, my suggestion is that not one more development should be approved
until these problems are solved by the County Council.
21. Joe Lorenz [NOT PRESENT]
22. Sally Ann Gialo (Indian Land): I don’t know if I approve or disapprove of this
issue. I have a completely other issue concerning developer accountability. I live
in a Kolter developed property up in Indian Land called Covington. I have been
corresponding with the Planning Director over the years because the developer
had no accountability for things that weren’t done. In fact, now we have a
resident- controlled board and yet we still have issues with the developers who are
not there any longer. My position would be to ask the Commission and planning
people to look into accountability for the developer and looking into whether or
not they were good neighbors. Did they have problems with developing in other
Kolter communities? And in fact, we did. Is there anything outstanding in prior
communities? I have delt with Kolter people over the years from Candice Maine
to Doug Patelo and their planning people and the issues remain to this day. The
other thing that Kolter did state that in their presentation is yes, it’s the baby
boomer generation and it is 55 and over and a lot of us bought our homes to not
move again. We want to live there peacefully and not having to worry about the
infrastructure issues are going to cause us to have these special assessments
within ten years of us moving there. I would encourage you all to look back to see
how the developers treated the communities that are already in place and if there
are issues, look into if they are good neighbors to the county and take those into
consideration when you make your decision. I think there should be impact fees.
Whereas people say it’s 55 and older there are no children in school but there are
a lot of people raising their grandchildren.
23. Roy Sansbury (Van Wyck): I would like to reiterate what Mayor Corcoran has
said brought up to you about the Small Area Plan. You have listened to a lot of
statistics and very valid reasons tonight not to approve of the new development.
But I think you already have your answer within the Small Area Plan and the
Comprehensive Plan there was much time and energy, and taxpayer’s dollars put
into these studies. The planning department did a phenomenal job of investing
hours, months, and years in these two plans and they work. The hours and the
time and taxpayer dollars should not be wasted. I implore you to leave the
comprehensive plan as it was drafted.
Shelly Richards: Thank you all for coming out and speaking about this and your
presentations were great.
Chair Jason Cavalier closed public hearing and called for a motion on item
CP-2024-1735
Motion to approve by Frances Liu; 2
nd by Jason Cavalier.
Discussion:
Judiana Tinklenberg: I have quite a few thoughts on this, we spent quite a lot of time on
the comprehensive plan last year and one of the main concepts of that plan was that we
would like to attract good developers that want to invest in our County. It is worrisome to
me if we were to approve this, we would be setting a precedent that we are willing to
change our Comp Plan. It is supposed to be our basis of making our decisions
Another concern is whether this is 55 and older community. I don’t feel comfortable
setting the precedent that we are willing to waive impact fees. I want to attract residents
and developers that want to invest in our entire community. As another person
mentioned, it would impact future voting that would change the direction of our county
moving forward. I asked the question earlier about the 3.2 acres that you are providing
the county - that is wonderful, but out of the total amount of acreage that is not much. If
you’re not willing to also build out what you are offering it is not very helpful.
For all of those reasons I cannot support this project in any capacity. I just want to
thank everyone for their time and coming out. I do appreciate the good presentation,
thank you.
Shelly Richards: I agree with Ms. Tinklenberg. I am a registered professional engineer in
multiple states. I am a 30-year resident of Lancaster County, and I don’t see the need for
another 55 plus community. I live in the southern part of the county, but I work in
Charlotte, so I drive up there every day. Several of you have talked about EMS, I have
unfortunately 6 times in my life had to give CPR to someone you didn’t survive because
EMS could not get there for one reason or another, so I definitely feel you on that I
wasn’t on this commission when things were done so you can’t lay blame for the
previous people, but I do see the strain that this would put on the county. I don’t see the
benefit that it would outweigh that.
Frances Liu: I agree with the first two things that Ms. Tinklenberg said about the Comp
Plan. I believe that it is a slap in the face to residents to ask them to work along with staff
to work on a Comp Plan, and then less than a year later have someone to come along and
ask that it be overturned. If I was a resident who spent time on that and going to the
meetings and so forth, I would ask what’s the point? Second, the impact fees: I also have
the same concern that if you are a good neighbor, you might not have people in your
community using the schools but the products of those schools - the graduates - that stay
in this community are going to benefit. The residents are going to benefit from those
educated students taking on jobs in the community. It disturbs me when someone does
not want to pay impact fees.
Last on my list is infrastructure. I feel it would be irresponsible to have more
development that we can control. We couldn’t control anything in the past that; wasn’t on
our shift. Things were different when people did vote for them, but now I am concerned
about infrastructure.
Called vote: 0:6. Motion is denied unanimously.
Chair stated the item will go to County Council for consideration, and applicant will be
notified of time and date.
d. DA-2024-1732 Cresswind Development Agreement
(January Agenda) Application by Kolter Group Acquisitions LLC for a Development
Agreement for approximately 868.12 acres comprising the following parcels located
between Charlotte Highway and Van Wyck Road: TM #s 0019-00-007.02, 0016-00-
066.01, 0019-00-018.00, 0019-00-023.01, p/o 0019-00-019.00, p/o 0015-00-047.00,
0016-00-065.00, 0016-00-065.01, 0019-00-019.02, p/o 0020-00-001.00, 0019-00-
007.00.
SEE ITEM 5a ABOVE FOR PRESENTATION
Public Hearing: (See attachments: Sign-in Sheets) None signed in.
Chair Jason Cavalier closed public hearing and called for a motion on item DA-2024-
1732
Motion to approve by Frances Liu; 2
nd Lynette Hinson.
Discussion:
Frances Liu: I did the math on the 80/20 rule; I am just curious I have not heard of that.
April Williams: That’s a HUD requirement. [The developer] can limit things but that is a
HUD requirement, technically even if they have restrictions children would be allowed.
Shelly Richards: What is the dollar amounts on the school impact fees?
April Williams: We looked that up and currently for a single-family home it is 9,336.00.
Frances Liu: I did the math, it is 7.9 million.
Shelly Richards: Did I see that slide correctly? I thought it said 1.8 million and some
change is what they are proposing?
Allison Hardin: Yes, it’s 1.85 million basically its shared impact fees for EMS, sheriffs
and parks all that money would not go to one of those agencies. The proposed solid waste
fee and the proposed library fee are two fees we don’t currently require. What the
applicant proposed would end up being $426,000 in solid waste fees over ten years.
$213,000 in library fees over ten years and the 1.8 is all the impact fees other than school
over ten years.
Frances Liu: I was concerned about not having the school impact fees, but now I see that
almost 400 houses would have to be built before they would even do the turn lanes, that
was quite an eye opener.
Called vote: 0:6. Motion is denied unanimously.
Chair stated the item will go to County Council for consideration, and applicant will be
notified of time and date.
e. RZ-2024-1732 Cresswind LDR and RN to MDR
(January Agenda) Application by Kolter Group Acquisitions LLC to rezone 851.50
acres located between Charlotte Highway and Van Wyck Road: Four parcels (TM#
0016-00-065.00, 0016-00-065.01, 0019-00-019.02, 0016-00-066.01) totaling 239.086
acres from LDR (Low Density Residential) to MDR (Medium Density Residential)
District, and seven parcels (TM #s 0019-00-007.02, p/o 0020-00-001.00, 0019-00-
007.00, 0019-00-018.00, 0019-00-023.01, p/o 0019-00-019.00, p/o 0015-00-
047.00) totaling approximately 612.414 acres from RN (Rural Neighborhood) to
MDR (Medium Density Residential) District in order to develop an age-restricted
single-family residential subdivision under the Cluster Subdivision Overlay District.
SEE ITEM 5a ABOVE FOR PRESENTATION
Public Hearing: (See attachments: Sign-in Sheets) None signed in.
Chair Jason Cavalier closed public hearing and called for a motion on item RZ-2024-
1732
Motion to approve by Lynette Hinson; 2
nd by Shelly Richards.
Discussion:
Shelly Richards: So, I know with Roselyn it was a significant effort to get the sewer
working and several lift stations and such because it is very flat in that area of the county.
Is this going to tie into that or is it going to be separate conveyance to the treatment
plant?
April Williams: I don’t have that answer from the district, but I do know that they would
have to construct their own pump station for this neighborhood and they will also have to
refit and uphaul one that is in a current neighborhood.
Called vote: 0:6. Motion is denied unanimously.
Chair stated the item will go to County Council for consideration, and applicant will be
notified of time and date.
f. RZ-2024-1733 Cresswind RN to INS
(January Agenda) Application by Kolter Group Acquisitions LLC to rezone 3.2 acres
located between Charlotte Highway and Van Wyck Road (p/o TM # 0015-00-047.00)
from RN (Rural Neighborhood) to INS (Institutional) District, as part of a master-
planned development incorporating residential and commercial elements.
SEE ITEM 5a ABOVE FOR PRESENTATION
Public Hearing: (See attachments: Sign-in Sheets) None signed in.
Chair Jason Cavalier closed public hearing and called for a motion on item RZ-2024-
1733
Motion to approve by Shelly Richards; 2
nd by Judianna Tinklenberg.
Called vote: 0:6. Motion is denied unanimously.
Chair stated the item will go to County Council for consideration, and applicant will be
notified of time and date.
g. RZ-2024-1734 Cresswind RN to GB
(January Agenda) Application by Kolter Group Acquisitions LLC to rezone 13.42 acres
located between Charlotte Highway and Van Wyck Road (p/o TM # 0015-00-047.00)
from RN (Rural Neighborhood) to GB (General Business) District, as part of a master-
planned development incorporating residential and commercial elements.
SEE ITEM 5a ABOVE FOR PRESENTATION
Public Hearing: (See attachments: Sign-in Sheets) None signed in.
Chair Jason Cavalier closed public hearing and called for a motion on item
RZ-2024-1734
Motion to approve by Shelly Richards; 2
nd by Lynette Hinson.
Called vote: 0:6. Motion is denied unanimously.
Chair stated the item will go to County Council for consideration, and applicant will be
notified of time and date.
Chair Jason Cavalier made a Motion for a five-minute recess.
Motion to approve by Shelly Richards; 2
nd by Judianna Tinklenberg.
Chair Jason Cavalier made a Motion for a to return from the five-minute recess.
Motion to approve by Shelly Richards; 2
nd by Sheila Hinson.
h. SD-2024-0656 Eagles Landing (Edgewater)
(January Agenda) Application by True Homes LLC and Lancaster County Forfeited
Land Commission for a Preliminary Plat for 65.94 acres located off Edgewater
Parkway (p/o TM# 0106-00-003.00) to develop a 132-lot single family residential
neighborhood (aka Eagles Landing). This area is part of the Edgewater community.
Staff Presentation: Matthew Blaszyk, Planner presented the application consistent with
the staff report. Staff Recommendations: Approval
Comment from applicant(s):
Joel Madden from True Homes:
Updates have been made since feedback from December meeting.
• Second connection to Edgewater Parkway
• Access has been widened
• Curb and Gutter moved (Sewer and storm drainage are already in place
underground)
• Reduced lots to 132 from the original plan for 178 due to challenging topography,
creating more open space
• Erosion Control permit application for new road has been submitted
• Working with LCWSD on a plan for shifting any pre-existing infrastructure if
needed
Regarding Catawba Ridge Boulevard:
Initial phase 0 has been approved; phase 1 is in process and on track; Phase 2 plans are
prepared and nearly ready to submit. Coordinating with Contender so the transition to
their portion can be made without stopping work.
Questions from Staff:
Shelly Richards: What is the timeframe to get the road to actually connect to 200?
Joel Madden:
We estimate completion of phase 1with a slight permitting delay which slides it back to
about September 30th. That’s the portion that is under our control. Beyond that I can only
tell you what Contender has told me: their hope and their intent is to roll right into phase
2 of the road it is being designed so we can do that. What I would love to see is that the
contractor never leaves the site. They build phase 0, we get approvals on phase 1. We
build phase 1, and then we move on to phase 2, and then we move right on through there.
If all that happens the road could be completed as early as 2026.
April Williams: I would like to clarify something for the record. True Homes by their
development agreement is only obligated up to a certain part and then after that
Contender is obligated. However, they have obtained the same engineer to do the work,
so they are hoping to encourage the seamless nature of that. They are trying to work on it
as all of one project even, through they are not responsible for that bottom part.
Steve Matthews with Hansworth and Boyd, PA representing the Forfeited Land
Commission:
For approximately ten years we were trying to find someone to go in and take over that
development. Fortunately, True Homes came along, and we were able to work out an
arrangement. Our interest is in getting the property sold to True Homes, which is taking it
on a lot by lot basis over the course of about 7 years, in order to get it back on the tax
rolls. There had to be a collaborative effort between the County, the Forfeited Land
Commission, the bond holders from the original deal that didn’t work out, and True
Homes in order to set that up. With regard to particular applications like this it’s the
sequence that is important to us. Because they only take the property down in chunks
instead of buying it all at once at the onset that there are certain things that have to
happen before they can buy certain pieces. So for example in phase 6, we have to have a
Preliminary Plat approved so we can then figure out exactly what going to be located
where and determine where we are going to draw the lot lines. And we have to have the
lot lines drawn before we can turn it over to them. So we do have a particular interest in
Preliminary Plat approval as quickly as it can be done.
I am not going to get into the details of the road structure and the way in which it’s being
done. But just in terms of the Forfeited Land Commission interest we want to get the
property back on the tax rolls as soon as possible and to do that the sequencing is
important to us. I would be remiss if I didn’t say that we have been just extraordinarily
pleased and delighted with the cooperation that we have got from staff Mr. Blaszyk, Ms.
April Williams, Ms. Allison Hardin back when we were coming up on the December
meeting of the Planning Commission they were working into the evenings through the
day right up until right before y’all convened in December trying to make sure they
understood how the development agreement worked. But the important thing is the
sequencing and how that would work to make sure that your concerns were addressed as
well as being able to serve the development agreement. And we appreciate that
cooperation. If you have any questions about how the development agreement works I
would be happy to answer them.
Chair opens Public Hearing for SD-2024-0656
Public Hearing: (See attachments: Sign-in Sheets).
The following are summaries of concerns raised by citizens.
1. Lynne Wilken (Lancaster): Here we are with another 132 homes, yet we lack
police, fire and EMS services in the Edgewater community.
I would like to quote Darin Player your County Director of Lancaster Fire
Rescue and Emergency Services. He stated that “They use to get 1200 calls a year
or 3 a day but that volume has exploded tenfold.”
I would also like to quote your County Administrator Dennis Marstall “[he]
estimates that Lancaster has 5 years or less before the fire services reach crisis
levels.” “Residents will notice pockets of pain due to woefully inadequate
response times.” He also stated “You will see the tragedies of full houses burning
down before anyone can get there.” Also according to Mr. Marstall, the county is
looking to create a county wide tax district to pay for new fire stations which I
believe will mostly serve Indian Land due to their expansion. I can only hope that
we can find a way to resolve this problem county-wide.
[Edgewater has] a volunteer fire department. Our station is not manned on a
daily basis. All of our volunteer firemen work jobs in other cities. It takes time for
them to leave their jobs to come and attend a fire. So a question I have is, how did
the county find 90 million dollars in their budget to build a new prison in the
county, but lack the foresight to see the growth in Indian Land over the last 5
years? Where no measures were taken to plan and fund the growth here, but you
continue to approve more home sites that the county cannot support with fire
rescue, police, and emergency workers. I think you need to reconsider approving
more residential sites until you can address the lack of adequate services for the
community. I have been in a house fire; I choose not to go there again. If you
have never been in a house fire, let me ask you this question, can you guys live
with the fact that if we have a fire in Edgewater, can you guys live with that?
2. Art Ilharreguy (Lancaster): We keep building homes and we keep approving and I
am rather surprised this particular developer, True Homes, does not seem to be
involved when it comes to infrastructure. I am amazed at hearing the numbers of
the fire departments etc. In the last 18 months we have had 5 incidents that [have
blocked] somewhere between Bethel Boat Landing and the entrance to Edgewater
for 18 hours all total. We had one just the other night on Wednesday for 2 ½
hours a gentleman unfortunately passed away. They didn’t even get to him for 5
½ minutes. I think that this is a good example of why we need more than one exit
out of our community.
We know that the growth keeps continuing the county that wants taxes, money,
and bonds being cashed out. An old owner that has taken and filed bankruptcy in
the past to be able to buy this property for as little as 50 cents on the dollar. I think
that there has been plenty of money that has come through this area with 3,600
homes, that 4.8-mile drive is one big cul-de-sac. This young lady knows for a fact
because she has counted 24 cars just to try to get to work in the morning coming
out of Flower Gate. I have gone back to the original plat maps, the ones that were
filed back in 1995 and in 1998 there is a way that they could extend out of the
cottages right out of Bear Creek that would come right down off that side and hit
the other side of the club house. Another one that they could do off Links 1 or
Links 2 and that would connect over to route 51. That’s less than 400 yards off
Links 1 or Links 2 you can be over to Flower Gate. Flower Gate can go all the
way around and go all the around to the dump so we have many ways that we can
get and be out of Edgewater, but it’s only going to happen if you folks sit there
and make True Homes do it because True Homes is notorious for doing as much
as they can for as little as it cost.
3. Michelle Reichartz (Edgewater): When I originally bought my house a year ago
from True Homes, I wanted this to be my forever home. Now I can’t wait to get
out because it has been an absolute nightmare. There is only one road in and out
of there. That second built road they are talking about is not going to resolve that
problem. All it takes is one disaster and everyone has to evacuate and then
everybody would get stuck. It’s an absolute nightmare.
Beyond that there is also an issue of True Homes not being held accountable.
When my home was built, I started having issues, they had to send over a
subcontractor four different times to fix tile issues in my home. Because their
subcontractor would literally cause damage as they were doing the repairs. I had a
post construction inspection done and they found that there was an entire chunk of
one of my trusses missing. It wasn’t broken; it was straight up not there. How did
you guys miss this? How did the county inspector miss this? How does anybody
that does quality control miss that? And not only did it take them multiple months
to address the issue, but once they even came, they did it illegally. They didn’t
have anybody come over to say professionally how to fix the truss, they just did it
themselves. They gave me and my family the excuse of “well this is a basic repair
we don’t need an engineer come over for this, it’s not required.” Me and my
parents checked afterwards, and it turned out that was a lie. There is no “basic
approved repair,” they are required to have an engineer for that at the time it was
done. Not only did they not get an engineer, but they didn’t even get the required
permits in the first place. We asked you guys, and you checked and said to us, no
they never got a permit and that yes, an engineer is required for that when the
work was done and I know the exact dates. I literally had to threaten their
warranty department with [legal action]. After the engineer came to check it out
months later, I never got the engineer letter, and I still to this day do not have the
original letter because True Homes won’t give it to me. They sent me an email
and an electronic copy and said that this will have to be good enough for you. It’s
completely inappropriate. These people need to be stopped they need to be held
accountable to quality work.
4. Donald Reichartz (Edgewater): How and why should you trust True Homes?
They make a lot of promises and do not keep much of them. True Homes said that
Contender Development would finish the road at Catawba Ridge Drive to Hwy
200 but let’s see and wait until we build another project. And Contender wants to
build another 1400 homes in the area with the same 1998 (I keep hearing 1998
standards)! More stressful traffic on the road will be there. And then on the state
road, only one way in and one way out.
State Road 296 looks like it will be another main entrance in the future for Ryan
Homes. Well, how many homes are Ryan Homes going to put out there? They are
knocking all the trees down all on that road. Yesterday we came back at 4:00 in
the afternoon. The main road coming in there was a log truck tipped over on its
side and I am glad when it tipped over it was on its right and not left. Nobody
would have gotten in for hours. It’s ridiculous what they get away with. What is
the county’s responsibility or liability for more and better roads for an escape plan
if we do have a major fire for this one road in and out? Because the county can’t
play dumb. I think they are going to be responsible. Let’s wait and see if the roads
are going to be done before we start another phase. This is a health and safety
problem. The planning department said their hands are tied. They told us to go see
the County Fire Marshall. I talked to him, and he said his hands were tied because
of the deal of 1998 codes. You know True Homes sales staff should tell every
customer about the 1998 code, but they still charge you at 2025 prices. I wish I
could have a deal of not paying taxes or paying for the land until they get
approval for it. I have been looking for a lot for a year now, all these tract home
builders are buying up all this property. You can’t find a lot for an individual in
Lancaster County. It’s sad and I have been in construction for 40 years and that
was my daughter that was up here. They do some very shabby work. I also talked
to a building inspector, and you know what he told me? Go put a claim with the
state and the state was not much help either. It’s up to you people because you are
our last hope.
5. Kristi Kozak (Lancaster): I am not here to address the roads; it looks like you
have a plan in place, and it just needs to be implemented. And so, I would like to
take a few minutes to say why I like Edgewater and why I enjoy living there. It
seems that every time they put more homes into the community, they add more
amenities for me for my friends for my community. So, we can enjoy it there.
When they added these homes recently, what did they do? They added a pool
because they knew that there wasn’t going to be enough room at the last pool, so
they added another pool. They keep adding and landscaping to keep the
community beautiful and I enjoy that. They are going to be adding more pickle
ball and they are going to be holding events there and this is nice because I don’t
even have to leave my community to enjoy my home, to enjoy my friends, to
enjoy my family and I am enjoying True Homes and what they are doing for the
community. I just want to say that I enjoy living here, I enjoy Lancaster, and I
enjoy my community, and I love Edgewater.
6. Bryan Black (Edgewater): I have lived in Edgewater for two years and you have
your ups and downs, people are happy, people are sad. All and all it’s a great
neighborhood. I would like to see the progress go because the sooner it’s done the
sooner everybody is happy and the end of construction. The progression needs to
go, we need to see the community moving forward, we have a vision. We see the
signs of how everything is supposed to be. We have a new golf club going in, we
have new restaurants going in, they have the new pickle ball courts, and the racket
ball courts. The roads are going to be built, it’s just a beautiful place to be. I just
would like to see everything being done so we can enjoy it, and the neighborhood
can be a neighborhood without everybody fighting about who’s right and who’s
wrong. If there is a problem, that is a warranty problem. You have 500 good
homes, you have 2 that are terrible, you have issues, you fix it and overcome it
and that’s it. I am happy with the people there; I have met some good people and
neighbors. It is a great place so have a positive attitude and stop focusing on all
the negative.
7. David Reichard (Edgewater): I am an architect and have had 40 years in
construction, development and design. I am asking you to postpone approval of
this phase of development of Edgewater. Basically, for all the reasons that
Cresswind didn’t get approval, all those issues are in Edgewater. Additionally, as
other people have said we have a new restaurant going in which hasn’t even
opened yet. We have new pickle ball membership going in, we have a nine-hole
golf course going in. There are developments that the first foundation or the first
road and the two other developments or three other developments are only half
completed. Why start another one? Finish the others, build the roads first and
please evaluate the traffic that we are going to have from the open membership to
the golf course to the pickle balls. It’s worth repeating that we have accidents
regularly now and that the road closes. The other day there was a log truck
overturned. So just asking that you postpone, properly evaluate it. I don’t know
why you would want to start another development when you haven’t even
finished the others.
8. Joyce Baker (Edgewater): I am going to be brief. I am opposing this new project.
I have been told since we came to this community in 2020 that this road was
going to be built, and it just keeps being delayed. We have had too many
problems, too many accidents (logging truck). I feel like True Homes is placing
profit over people. I have multiple sclerosis; what if I need emergency services?
We do need another entrance and exit into the community. I plead with you not to
approve this until that road is completed. We were just told that this road would
be completed in 2026. I don’t know if that’s a firm date, since I have been told
multiple times that it was coming. Five years later we still don’t have the road, so
I am not feeling like that 2026 date is firm. That’s all I have to say.
9. Michael Marsh (Edgewater): My remarks to the commission and my friends are
not necessarily to persuade or make light of issues brought before this body but to
bring balance to a discussion. After deciding to uproot our lives and move from
Cleveland Ohio in 2020, my wife and I spent well over a year trying to decide on
a place to live and looked at well over a hundred homes in different parts of South
Carolina. We selected Edgewater for its sheer beauty, its promise. True Homes
has proven to be a great developer, Edgewater is a beautiful community
surrounded by a golf course on a lake. True Homes designed homes that offer a
great aesthetic with quality materials and beautiful amenities: two pools, the
pavilion down by the water, walking trails, ponds, green areas, a brand-new club
house, the restaurant that will open soon. What True Homes has already built has
attracted some of the nicest people I have ever met, from all over the United
States. I have met people from as far away as California, Alaska, and New York.
Many of them have expressed to me the reasons they moved here, the promise of
a beautiful future living in one of the most up and coming communities in South
Carolina. Edgewater, however, is a community that is under construction; one that
is transforming and growing. The growth will affect the City of Lancaster and the
County as well. As a growing community the residents of Edgewater will
experience inevitable pains, challenges, and inconveniences of the growth. True
Homes has responded quickly to issues. True Homes shows a commitment to the
residents and to the community at large. As residents who have invested in our
homes, let’s not lose sight of what’s brought us here, what draws new
neighborhoods here because this community will not always be under
construction. There will come a day when the construction is done, and the trucks
and heavy equipment are gone. That day Lancaster will look very different, and
Edgewater will look very different. Our investment in our homes depends on that
day. All residents in the community and the city and county at large will partner
with True Homes to see this promise fulfilled. Much more work and many more
challenges ahead, inconveniences lie ahead, growing pains lie ahead. Let’s
embrace them with courage and excitement. Remember what brought you here
and prepare to welcome the new neighbors who have not yet arrived. Let’s keep a
beautiful thing going. Respectfully submitted.
10. Lasandra Middleton (Edgewater): Coming from New York City where everyone
is on top of one another, I am delighted with my beautiful home. The congestion,
having one way in and one way out poses the problem. The wildfires in California
raise concern for me. I attended the community meetings and discovered that we
don’t have a fire department like FDNY who is paid to be on call 24/7. Let’s
continue to build, but let’s make sure everything is in place A fire department,
more than one way in and out, to avoid incidents like the closure that occurred on
Ruby Road and Bethel Boat Landing with the log truck. EMS response time is
also concerning. Open more roads.
Response from applicant(s):
Summary:
True Homes: The revised plan does offer more connectivity with additional
access in and out of the Cottages.
We are committed to doing our part on the Catawba Ridge Blvd. We understand
the importance of it, as I said we are working hard on those plans we’ve got a
conditional approval on phase 0 we are ready to get started on it as soon as we get
the permit to do the erosion control on that and then to roll right into phase 1.
I have had the opportunity to speak to several residents today and some of
the suggestions were more communication, more frequent communication. I
joined True Homes about 7 months. We do put out a monthly newsletter with land
development updates. I commit to adding more detail on those. We set forth a
permitting schedule here and it’s shifted a little bit from December, We will keep
everybody updated as we progress.
Chair closes public hearing and calls for a motion for SD-2024-0656
Motion to approve by Sheila Hinson; Second by Judianna Tinklenberg.
Discussion:
The following are summaries of Commissioner comments:
Shelly Richards: new total: I had to wait on 32 cars to get off of Flower Gate Farm Road
to get onto Bethel Boat Landing. Bethel Boat Landing was never intended to be the main
ingress/egress out of Edgewater. I have also had conversations with Fire Marshall; he is
very concerned about the response time. And just to let all of you know, you are paying
higher homeowners’ insurance because of the response time for fire and EMS to get in
there, so getting another ingress/egress is extremely important. Flower Gate Farm Road
was never designed to handle that much traffic.
Having said all of that, there is a planned development agreement that is older
than dirt that we are still legally liable to adhere to. We do hear what you are saying, and
we are going to try and do the best we can to address the development of Edgewater.
Judianna Tinklenberg: Concurs with Richards statements.
Thank you for coming and sharing your thoughts and I sympathize with you; it is not an
always comfortable place to sit up here. We have to make very hard decisions. We are
having to look at this neighborhood based on a very old UDO and a very old
development agreement that I don’t necessarily agree with. I wish I could change it, but
they did listen to our comments the last time they came before us they added the drive
that I specifically asked for. Hopefully the coordination with Contender will continue so
we can get everyone in this room what they need to be safe in their communities. I want
[citizens] to feel like they are getting what was promised to them.
Frances Liu: I am appalled by what I heard tonight about the safety of people. I
understand this rule is from 1998. I live in a community of 147 homes with one ingress
and I know that the rules were changed after. But my question is, and I don’t mean to be
flip or rude but if there is nothing we can do, why are we here tonight and hearing this?
Why did we hear the case?
Allison Hardin: If I may answer this question? The Planning Commission and all of us
here are under some regulations and requirements. The Planning Commission is held to
certain rules by the state law that apply to subdivisions. It’s in Title Six Chapter 29 of the
state law of the Comprehensive Planning Law of Rule which gives the Planning
Commission the final review on subdivisions. That rule also says that the Planning
Commission must act within so many days with the application or else the review is
considered approved. So sometimes you will see subdivisions who come before the
Planning Commission that are obviously not ready to go, but we are bound by the days
that we must do that and at that time staff will say we can’t recommend approval and list
out the TRC concerns. Because the Planning Commission is the last body of review [for
Preliminary Plats], the next step is to appeal to court.
What we do is to give you advice based on the law and based on the code. So, the state
law says you must review the UDO, and it says these are the requirements that you have
to do for a subdivision.
South Carolina law also says that they can set up agreements with local governments
called development agreements that will hold a certain piece of property under a certain
rule for a certain amount of time. Edgewater is the longest standing development
agreement that I have ever seen in the State of South Carolina, and I have worked in
planning in the State of South Carolina for almost 30 years. There is no one on our staff
that would have requested approval at that time for that kind of development agreement.
Because not only did it hold us to rules that needed to change at the time, it continues to
hold us to that and the only way to change it is to break an agreement with a developer.
The developer at the time was a different developer but the state law allows them to be
passed on to others. State law also says that there are very few things that override a
development agreement, [among them] building codes and fire safety codes. At the time
the development started, there was not a requirement under the fire code to have that
second entrance for neighborhoods of fifty or more. That changed as of 2024. The fact
that those two connections all go through and network to one road is something that is
regrettable and we are held to by the 1998 agreement.
On top of that 75-year development agreement, the State of South Carolina in 2009
did a retroactive permit extension during the recession that said that all permits that were
active from 2008-2012 were extended for 4 years and they did it again in 2012-2016. So
accentually the Edgewater agreement is an 83-year hold on zoning that has been in
existence since 1998.
We do what we can. Ms. Williams has been through the development agreement up
one side and down the other. Ms. Williams is the one who put a stop work order on the
Developers that brought them to the table to finalize the Catawba Ridge drawings. Since
that time, they have done what we asked and as staff, when we say we recommend
approval, we don’t take it lightly. We only recommend approval because we have no
points where we can say no. They have answered every question we have. Is it a great
idea to have all of these homes off of one main road that is not finished out? No, it’s not
good planning. If I was there in 1998 when this was done, I might have stood on my head
and screamed and give them my best advice. But this is what we have to deal with.
Until such time in the future that the County of Lancaster separates itself from the
Developer of the Edgewater subdivision either through contract dissolution or completion
of Edgewater, we are bound to this by law. We aren’t happy about it either. Edgewater
was important enough priority that as soon as I was hired, I had a briefing on it. We will
continue to do our best. But we are here because the law says that we have to give you
something, and we don’t have other things that we can check off on a [list].
Frances Liu: It helps me to understand why we went through this and what’s happening,
and I hope the excellent response from Mrs. Hardin helps people to understand what is
going on with this.
Ms. Hardin: If I may add one more thing, we are pushing as hard as we can on our staff
side to get those plans reviewed in a timely manner. Because there are times when
currently we have vacancies in the staff departments in both building and planning and
the like. We all know that this is a priority review.
Frances Liu: And please understand that my question was not to question anything about
staff, I know how hard working the staff is, but just for my first meeting, when it came to
a vote, I didn’t know what to do. Now I do understand.
Allison Hardin: We give you the best advice we can. If you were all to come up and say
no, then the applicant could have an option to go forward with a law suit.
Frances Liu: I wasn’t going to say it but that’s what I thought.
Allison Hardin: I can’t advise that you break the law.
Judianna Tinklenberg: When they came before us in December, we had the opportunity
to give comments; so we can also help the design by providing our input. They took our
comments, and they had that additional drive added, so while our hands are tied in a lot
of these decisions we are doing what we can, and we are trying to listen and
accommodate where we can.
Allison Hardin: Just because you must review, doesn’t mean you have to accept it as it is
presented. You can ask for [changes] if there is something worth saving. You can show
them that they need to do open space in a different way if there is a better plan or a better
process. [The Commission] and staff have worked with them over the years. We work
with everyone, that’s why there are hardly any lots between the corridor road between
Van Wyk and 521 on the Cresswind plan because our staff stood firm and said you can’t
have driveways out on our collector roads. So, we do our best to work with everybody as
much as we can to make the best product. We don’t catch everything 100% but I will put
my staff up against anybody.
Lynette Hardin: I remember when Lancaster Economic Development was active on this
in 1998. I know a lot of things slipped through the cracks but there isn’t a lot we can do
about it now. I do respect the staff, and all the hard work put into it. And to the residents -
it is beautiful out there and if there are certain things that we could do we would, and I
just want to say to the developers that I hope that you just do the right thing. It sounds
like you guys are trying to improve. This is my first time on this board as well, but I
appreciate the staff and the volunteers that come and make the recommendations, and I
just really hope that you guys listen to what your people are trying to say.
Jason Cavalier: I want to say something, this is not the first time that Mrs. Hardin had to
explain this. Twenty-seven years ago, I was just out of high school. We all would have
done something different. I would have done something different; the Planning
Department would have done something different. It wasn’t an option and again our
hands are tied. As she stated, this would be a lawsuit if we turned it down.
Frances Liu: I do want to say that this is the first time I have heard the explanation, as a
new commissioner.
Jason Cavalier: I understand.
Sheila Hinson: Twenty-seven years ago, nobody involved thought that Lancaster County
would grow the way it has. We’ve been a little country town, and we thought it would
stay that way. Nobody envisioned this. Lancaster County stands out as an exceptional
county in South Carolina. Work with us; let’s all try to get through this together.
Chair called for vote.
J Cavalier: For L Hinson: For Tinklenberg: For
Richards: Against S. Hinson: For Liu: For
Called vote: 5:1. Motion is approved.
The Planning Commission makes final decisions regarding Preliminary Plats.
S Richards: move for 5 minute recess. Approved by unanimous consent
--------
Motion to reconvene by L. Hinson; 2
nd by F. Liu. Approved by unanimous consent.
Meeting reconvened.
6. NEW PUBLIC HEARING ITEMS FOR RECOMMENDATIONS TO
COUNCIL
a. RZ-2024-2690 Lloyds/Dollar General
Application by Greg Googer on behalf of Lloyds Properties Inc/ Dollar General to
rezone one parcel of 2.1 acres located at the intersection of Old Pardue and Camp
Creek Roads (TM 0060-00-034.00) from Low Density Residential (LDR) to
Neighborhood Business (NB) in order to allow development of a convenience store.
Staff Presentation: Matthew Blaszyk, Planner, presented the application consistent with
the staff report. Staff Recommendations: Approval, as consistent with UDO and Future
Land Use per Comprehensive Plan.
Comment from applicant(s):
Greg Googer (Spartanburg SC) developer for project: We develop about 12-14 Dollar
General sites in South Carolina per year. We have completed other projects in Lancaster
County and enjoy a good working relationship with your Planning and Building
departments. We try very had to find rural underserved areas that have potential for
growth, so that we can bring infrastructure to rural communities. That’s our whole goal,
to serve the communities that have to drive miles for convenience items. People don’t
drive very far to reach a Dollar General, they serve people who already live there. We
actually reduce traffic because people don’t have to drive as far for staple and necessity
items. We’ve already gotten feedback from SCDOT to determine the safest access will
be from Old Pardue Road.
I’m available for questions.
Questions/comments from Commissioners:
S. Richards: I’m a construction engineer, I used to build Dollar Generals. You have
picked a good location, I know this area, it fills an important need in that area.
Googer: Our model has changed over the years. Now it’s much more modern and easier
to maintain, polished concrete floors, LED lighting for interiors, directional lighting on
exteriors to reduce light leakage – it’s a nice building we have planned.
Chair opened public hearing.
Public Hearing: (See attachments: Sign-in Sheets)
1. Buddy & Rita Teague (Old Pardue Road): opposes rezoning and building
a Dollar General. Questions whether any Commission members have visited area.
Concerned about:
• Traffic and wrecks at the intersection
• Bright lighting
• Concealment around building
• Lack of roundabout at intersection
• It will definitely increase traffic
2. Keith Sterling (Potter Road): opposes rezoning and Dollar General.
Moved here from New Jersey. Prefers the isolated rural character.
• Treacherous intersection
• Straightaway encourage drivers to speed
• 5 Dollar Generals within 5 miles of this site- unnecessary
• It will not decrease traffic, because it’s a destination now
• It will wreck the rural setting
• It will turn this rural area into New Jersey, stop it now while you can
3. Kelly Sellars (Inman SC) Civil engineer: available for questions. We chose
access from Old Pardue because there is no stop on Camp Creek Road, so Old
Pardue is the safer option.
Chair Jason Cavalier called for a response from Applicant.
Greg Googer: We chose access on Old Pardue for safety, as Kelly stated.
Lighting is much improved, used to show a quarter mile down the road, now it’s
encased and shines straight down rather than escaping off property.
Chairman Cavalier closed public hearing and called for a motion on item RZ-2024-2690
Motion to approve by S. Hinson; 2
nd by Richards.
Discussion: no further discussion.
Called vote: 6:0. Motion is approved denied unanimously.
The item will go to County Council for consideration, and applicant will be notified of
time and date.
b. CU-2024-2612: Cogito Academy
Application by Cameron Gill/True North K12 and Joseph Camposeo for a
Conditional Use Permit for a K8 charter school (“Cogito Academy”) and Early
Childhood Center to be located on 22.0 acres off Shiloh Unity Road (TM 0049-00-
082.00).
Applicant requested deferral. Motion to defer to March meeting by Richards; 2
nd by
Tinklenberg.
Called vote: _6:0. Motion is approved unanimously. Item is deferred to March 18,
2025 agenda.
7. NON-HEARING ITEMS
a. NRN-2024-2744: Long Drive Lane
(January Agenda) Application by Donna Ziegelbauer to name a shared private drive
(Long Drive Lane) at and adjacent to 10998 Caroline acres Road, pursuant to Sec.
6.11.4.G of the Unified Development Ordinance.
Staff Presentation: Jennifer Bryan, Planning Technician, presented the application
consistent with the Staff Report. Recommendation: Approval.
Chairman Cavalier called for a motion on item NRN-2024-2744
Motion to approve by J. Tinklenberg; 2
nd by S. Richards.
Called vote: 6:0. Motion is approved unanimously.
Planning Commission makes the final decision regarding New Road Names
b. NRN-2024-0679: Limitless Way
(January Agenda) Application by Joel E. Wood & Associates via Civil Construction
Plans to name a private drive (Limitless Way) located at 9364 Old Bailes Road (TM-
0007-00-028.00).
Staff Presentation: Jennifer Bryan, Planning Technician, presented the application
consistent with the Staff Report. Recommendation: Approval.
Questions to Staff
S. Hinson: They want to name their driveway?
Bryan: Yes. Since there will be three or more buildings [addresses] in this commercial
development, that triggers the requirement for a named private drive.
Chairman Cavalier called for a motion on item NRN-2024-0679
Motion to approve by Richards; 2
nd by Tinklenberg.
Called vote: 6:0. Motion is approved unanimously.
Planning Commission makes the final decision regarding New Road Names
8. OTHER
a. Appointment of Planning Commission Representative for UDO Stakeholder
Committee
• Per Shelly Richards, Jim Barnett is willing to continue as the appointed
representative on the UDO Stakeholder Committee. Commissioners agreed by
unanimous consent that he should continue.
• All Commissioners are welcome to attend the UDO Stakeholder meetings and
workshops.
b. Review of Next Month’s Agenda
• SD-2024-1745 Silver Run Preliminary Plat
• SD-2024-1442 Shadow Moss Preliminary Plat
• RZ-2025-0072 McDonald/Small (MDR TO GB .5 ac)
• RZ-2025-0191 Ingram/Old Carter (MH to MDR
• NRN-2025-0375 March Submittals
• CU Cogito Academy deferred tonight
c. Other Administrative Announcements
April Williams thanks the Commission for their efforts during the demanding
meeting.
9. ADJOURN
Motion to adjourn by S. Richards; 2nd by L. Hinson. Approved by unanimous
consent. Meeting adjourned at 10:43 p.m.
APPLICANT VERSION
STATE OF SOUTH CAROLINA )
) ORDINANCE NO. 2025-XXX
COUNTY OF LANCASTER )
AN ORDINANCE
TO AMEND THE UNIFIED DEVELOPMENT ORDINANCE (“UDO”) CHAPTER 2
DISTRICT DEVELOPMENT STANDARDS/USE CHART AND CHAPTER 5 USE
REGULATIONS, TO ADD A NEW USE “RETREAT CENTER” AND REGULATIONS
FOR “RETREAT CENTER” IN AGRICULTURAL (AR) AND RURAL RESIDENTIAL
(RR) ZONING DISTRICTS.
Be it ordained by the Council of Lancaster County, South Carolina:
Section 1. Findings and Determinations.
The Council of Lancaster County (“Council) finds and determines that:
(a) Lancaster County initiated a full rewrite of the Unified Development Ordinance (UDO) in
October 2021 to address substantive issues with the UDO and has retained a UDO consultant
to assist in the full rewrite of the UDO.
(b) Adam Thomas, owner of property at 2878 Kendelwood Dr, has been working on a plan for a
Christian retreat center to be located on his property. The retreat center would be used for
families and children, would accommodate the participants in on-site lodging, and would have
recreational opportunities as part of the programming.
(c) The current UDO does not have a definition for, or use standards, for a “retreat center ,” and
while such uses have been discussed in the rewrite, no definitions have been proposed at this
time.
(d) Mr. Thomas has requested to advance his goal by proposing changes to the UDO that include
defining a “retreat center” and provide guidelines for the use to be allowed in Agricultural
(AR) and Rural Residential (RR) zones.
(e) The Planning Commission reviewed the proposed changes during their December 2024 and
February 2025 public hearings. Other than the applicant, no members of the public spoke to
address the request. The Planning Commission unanimously (6-0) recommended approval of
an blended ordinance blending requests from Mr. Thomas with input from staff.
(f) The text amendments are consistent with the applicable provisions of the Comprehensive Plan
as required by UDO Section 9.2.15.B.3, as well as applicable provisions of South Carolina
Code, Title VI.
APPLICANT VERSION
Section 2. Amendment of Ordinance 2016-1442 (Unified Development Ordinance)
The Council hereby approves amendments to UDO Chapters 2, 5, and 10 as follows (additions
underlined; items to be deleted are struck through; sections where PC/Staff and Applicant versions
are different are highlighted in yellow):
CHAPTER 2 – Section 2.5.3 Use Table: Add “Retreat Center” to the list of uses Permitted with Review
(PR) in Agricultural (AR) and Rural Residential (RR) zones:
B. LODGING AR RR RN RUB MH REF
Bed and Breakfast
Homes (up to 8 rooms) PR PR PR PR - 5.3.1
Bed and Breakfast Inn
(up to 12 rooms) - - - - - 5.3.1
Boarding or Rooming
House - - - - - 5.3.2
Campground SE SE - - - 5.3.3
Dormitory - - - - -
Fraternity/Sorority
House - - - - -
Hotel/Motel - - - - -
Retreat Center PR PR 5.3.4
CHAPTER 5–– Use Regulations: Create a new subsection (5.3.4) to the list of Lodging uses in Chapter 5
and describe the requirements to obtain a permit for a “retreat center”:
5.3.4 RETREAT CENTER [AR, RR]
A. GENERAL/PRIMARY USES.
A retreat center is a use that provides for the operation of spiritual, cultural or educational
indoor or outdoor programs for single-day or in-residence guest use , and may include
sleeping accommodation for in-residence guests in a single building, tiny house, or cabins;
shared kitchen and eating area in a main building; limited kitchen facilities in cabins;
wedding and/or meeting areas; event/activity venues; worship areas; bathrooms;
accommodation or residence(s) for staff, manager(s), and/or owner(s); spa/therapy services;
recreational uses; agritourism and ecotourism activities ; and accessory buildings.
B. ACCESSORY USES.
Waste management, bathhouse/showers, laundry facilities for operations or guests (may
APPLICANT VERSION
be coin operated), equipment rentals, maintenance facilities, associated retail uses, and
other uses and structures customarily incidental to operation of a retreat facility. These
accessory uses will not be visible from any street outside the facility boundary and must
conform to the general setbacks in Section D.
C. ACCOMMODATION TYPES:
1. Main Building: Site of the primary use of the retreat center. May include operations for the
center, dining facilities, kitchen equipment, meeting/worship/event/activity space,
spa/therapy/gym facilities, laundry facilities, business centers, bathrooms/facilities to support
the uses, and rooms for overnight accommodations.
2. Accessory Buildings: structures that contain a use or accessory use in support of the retreat.
May include maintenance buildings, equipment garages, spa services, therapy services,
wedding/event/meeting support, laundry, and associated retail uses. Accessory buildings
may not have more than 50% of the square footage of the main building.
3. Lodge: Overnight accommodation with individual rooms for guests. Individual rooms do
not function independently from the retreat center as short -term accommodations. Maximum
rooms 12 for accommodations. Building may include dining facilities, kitchen equipment,
event/activity space, business centers, laundry facilities, bathrooms/facilities to support the
uses, and rooms for overnight accommodations. This definition serves for this use in this
section of zoning code and does not imply a relationship to the ICC definition of a lodge.
4. Tiny House: structure that conforms to the guidelines of the ICC definition of tiny house.
Maximum 5 guests per tiny house. Tiny homes do not function independently from the
retreat center as short -term accommodations.
5. Cabin: Minimal overnight accommodations for guests. Cabins do not function
independently from the retreat center as short -term accommodations. May include bunk
beds, bathroom facilities, limited kitchen appliances, and laundry facilities. Max 18 beds per
cabin. Cabin size will be established by ICC requirements of square feet per person.
D. LOCATION OF ACCESS.
Retreat centers shall conform to the following requirements:
1. No primary use, accessory use, or cabin, lodge, tiny home, or other accommodation may be
located to provide direct vehicular access to a main road; access must be provided from
APPLICANT VERSION
roads internal to the property.
2. Entrance to the retreat facility must be designed for safe and convenient movement of
traffic into and out of the facility .
E. DIMENSIONAL STANDARDS:
1. Front yard setback for all buildings, where boundary abuts a public street: 50 feet
2. Side yard setback for all buildings, where boundary abuts adjoining properties: 50 feet
3. Rear yard setback for all buildings, where the rear property line of the boundary
abuts adjoining property: 5 0 feet
4. Separation between cabins/lodges/tiny houses: 10 feet minimum
5. Minimum acreage to establish retreat use: 20 acres
6. Maximum number of Main Buildings: 1 per 10 acres of usable space
7. Maximum number of lodges: 1 per 5 acres of usable space
8. Maximum number of cabins/tiny houses : 1 per acre of usable space
9. Minimum open space: 40%
F. ROADS.
Internal roads shall be private, and must meet the following criteria:
1. Roads must meet the standards of the Fire Code, being an all-weather, well drained surface
free of objectionable dust.
2. Roads must provide adequate turn- around capacity at dead- ends for emergency services
and waste management.
G. PARKING.
Vehicle parking areas must be paved or compacted in the same manner as the internal roads. 1
parking space per 500 square feet in the Main Building plus 1 parking space per cabin, 1 parking
space per tiny house, and 1 parking space per transient accommodation in a lodge. ADA parking
requirements follow the ICC regulations. Parking for the lodge must be in close proximity to the
APPLICANT VERSION
building entry. Parking for the cabins and tiny houses may be in the same parking lot as the main
building. Parking areas will follow the landscaping requirements of Section 7.1.4.
H. BUFFER REQUIREMENTS .
The 50-foot setbacks required around the property perimeter will be preserved with natural tree
growth and vegetation to provide a semi- opaque visual screening. Where this is not possible, a
Type B Buffer Yard as described in Section 7.1.5.B.2 will be installed to create a visual separation
between the retreat center and adjacent properties.
I. SITE PLAN
A site plan shall be drawn to scale by a registered civil engineer or land surveyor , and show exact
dimensions of the parcels of land under consideration. The elements to be shown are as follows:
1. All property dimensions , lots, and street systems, proposed location of buildings and
size, plans for screening and protection of abutting properties , means of ingress and egress ,
access and circulation arrangements, open spaces, and other support facilities.
2. A drainage plan with two (2) foot vertical contour intervals. The number of acres for the
park, open space, and cabins/lodges shall be shown and each lot shall be numbered.
Section 3. Severability.
If any section, subsection or clause of this ordinance is held to be unconstitutional or otherwise invalid,
the validity of the remaining sections, subsections and clauses shall not be affected.
Section 4. Conflicting Provisions.
To the extent this ordinance contains provisions that conflict with provisions contained elsewhere in the
Lancaster County Code or other County ordinances, the provisions contained in this ordinance, to the
extent to of the conflict, supersede all other provisions and this ordinance is controlling.
Section 5. Effective Date.
Per the Pending Ordinance Doctrine, this ordinance is in effect as of first reading and is adopted into the
Unified Development Ordinance effective upon Third Reading.
APPLICANT VERSION
AND IT IS SO ORDAINED
Dated this __________ day of ________________________, 2025.
LANCASTER COUNTY, SOUTH CAROLINA
__________________________________________
Brian Carnes, Chair, County Council
__________________________________________
Bryant Neal, Secretary, County Council
ATTEST:
____________________________________
Sherrie Simpson, Clerk to Council
First Reading:
Public Hearing:
Second Reading:
Third Reading:
Approved as to form:
______________________________
Virginia Merck-Dupont, County Attorney
STAFF/PC VERSION
STATE OF SOUTH CAROLINA )
) ORDINANCE NO. 2025-XXX
COUNTY OF LANCASTER )
AN ORDINANCE
TO AMEND THE UNIFIED DEVELOPMENT ORDINANCE (“UDO”) CHAPTER 2
DISTRICT DEVELOPMENT STANDARDS/USE CHART AND CHAPTER 5 USE
REGULATIONS, TO ADD A NEW USE “RETREAT CENTER” AND REGULATIONS
FOR “RETREAT CENTER” IN AGRICULTURAL (AR) AND RURAL RESIDENTIAL
(RR) ZONING DISTRICTS.
Be it ordained by the Council of Lancaster County, South Carolina:
Section 1. Findings and Determinations.
The Council of Lancaster County (“Council) finds and determines that:
(a) Lancaster County initiated a full rewrite of the Unified Development Ordinance (UDO) in
October 2021 to address substantive issues with the UDO and has retained a UDO consultant
to assist in the full rewrite of the UDO.
(b) Adam Thomas, owner of property at 2878 Kendelwood Dr, has been working on a plan for a
Christian retreat center to be located on his property. The retreat center would be used for
families and children, would accommodate the participants in on-site lodging, and would have
recreational opportunities as part of the programming.
(c) The current UDO does not have a definition for, or use standards, for a “retreat center ,” and
while such uses have been discussed in the rewrite, no definitions have been proposed at this
time.
(d) Mr. Thomas has requested to advance his goal by proposing changes to the UDO that include
defining a “retreat center” and provide guidelines for the use to be allowed in Agricultural
(AR) and Rural Residential (RR) zones.
(e) The Planning Commission reviewed the proposed changes during their December 2024 and
February 2025 public hearings. Other than the applicant, no members of the public spoke to
address the request. The Planning Commission unanimously (6-0) recommended approval of
an blended ordinance blending requests from Mr. Thomas with input from staff.
(f) The text amendments are consistent with the applicable provisions of the Comprehensive Plan
as required by UDO Section 9.2.15.B.3, as well as applicable provisions of South Carolina
Code, Title VI.
STAFF/PC VERSION
Section 2. Amendment of Ordinance 2016-1442 (Unified Development Ordinance)
The Council hereby approves amendments to UDO Chapters 2, 5, and 10 as follows (additions
underlined; items to be deleted are struck through; sections where PC/Staff and Applicant versions
are different are highlighted in yellow):
CHAPTER 2 – Section 2.5.3 Use Table: Add “Retreat Center” to the list of uses Permitted with Review
(PR) in Agricultural (AR) and Rural Residential (RR) zones:
B. LODGING AR RR RN RUB MH REF
Bed and Breakfast
Homes (up to 8 rooms) PR PR PR PR - 5.3.1
Bed and Breakfast Inn
(up to 12 rooms) - - - - - 5.3.1
Boarding or Rooming
House - - - - - 5.3.2
Campground SE SE - - - 5.3.3
Dormitory - - - - -
Fraternity/Sorority
House - - - - -
Hotel/Motel - - - - -
Retreat Center PR PR 5.3.4
CHAPTER 5–– Use Regulations: Create a new subsection (5.3.4) to the list of Lodging uses in Chapter 5
and describe the requirements to obtain a permit for a “retreat center”:
5.3.4 RETREAT CENTER [AR, RR]
A. GENERAL/PRIMARY USES.
A retreat center is a use that provides for the operation of spiritual, cultural or educational
indoor or outdoor programs for single-day or in-residence guest use , and may include
sleeping accommodation for in-residence guests in a single building, tiny house, or cabins;
shared kitchen and eating area in a main building; limited kitchen facilities in cabins;
wedding and/or meeting areas; event/activity venues; worship areas; bathrooms;
accommodation or residence(s) for staff, manager(s), and/or owner(s); spa/therapy services;
recreational uses; and accessory buildings.
STAFF/PC VERSION
B. ACCESSORY USES.
Waste management, bathhouse/showers, laundry facilities for operations or guests (may
be coin operated), equipment rentals, maintenance facilities, associated retail uses, and
other uses and structures customarily incidental to operation of a retreat facility. These
accessory uses will not be visible from any street outside the facility boundary and must
conform to the general setbacks in Section D.
C. ACCOMMODATION TYPES:
1. Main Building: Site of the primary use of the retreat center. May include operations for the
center, dining facilities, kitchen equipment, meeting/worship/event/activity space,
spa/therapy/gym facilities, laundry facilities, business centers, bathrooms/facilities to support
the uses, and rooms for overnight accommodations.
2. Accessory Buildings: structures that contain a use or accessory use in support of the retreat.
May include maintenance buildings, equipment garages, spa services, therapy services,
wedding/event/meeting support, laundry, and associated retail uses. Accessory buildings
may not have more than 50% of the square footage of the main building.
3. Lodge: Overnight accommodation with individual rooms for guests. Individual rooms do
not function independently from the retreat center as short -term accommodations. Maximum
rooms 12 for accommodations. Building may include dining facilities, kitchen equipment,
event/activity space, business centers, laundry facilities, bathrooms/facilities to support the
uses, and rooms for overnight accommodations. This definition serves for this use in this
section of zoning code and does not imply a relationship to the ICC definition of a lodge.
4. Tiny House: structure that conforms to the guidelines of the ICC definition of tiny house.
Maximum 5 guests per tiny house. Tiny homes do not function independently from the
retreat center as short -term accommodations.
5. Cabin: Minimal overnight accommodations for guests. Cabins do not function
independently from the retreat center as short -term accommodations. May include bunk
beds, bathroom facilities, limited kitchen appliances, and laundry facilities. Max 18 beds per
cabin. Cabin size will be established by ICC requirements of square feet per person.
D. LOCATION OF ACCESS.
Retreat centers shall conform to the following requirements:
STAFF/PC VERSION
1. No primary use, accessory use, or cabin, lodge, tiny home, or other accommodation may be
located to provide direct vehicular access to a main road; access must be provided from
roads internal to the property.
2. Entrance to the retreat facility must be designed for safe and convenient movement of
traffic into and out of the facility .
E. DIMENSIONAL STANDARDS:
1. Front yard setback for all buildings, where boundary abuts a public street: 50 feet
2. Side yard setback for all buildings, where boundary abuts adjoining properties: 50 feet
3. Rear yard setback for all buildings, where the rear property line of the boundary
abuts adjoining property: 5 0 feet
4. Separation between cabins/lodges/tiny houses: 10 feet minimum
5. Minimum acreage to establish retreat use: 20 acres
6. Maximum number of Main Buildings: 1 per 10 acres of usable space
7. Maximum number of lodges: 1 per 5 acres of usable space
8. Maximum number of cabins/tiny houses : 1 per acre of usable space
9. Minimum open space: 40%
F. ROADS.
Internal roads shall be private, and must meet the following criteria:
1. Roads must meet the standards of the Fire Code, being an all-weather, well drained surface
free of objectionable dust.
2. Roads must provide adequate turn- around capacity at dead- ends for emergency services
and waste management.
G. PARKING.
Vehicle parking areas must be paved or compacted in the same manner as the internal roads. 1
parking space per 80 sq ft of main assembly hall plus 1 parking space per cabin, 1 parking space
STAFF/PC VERSION
per tiny house, and 1 parking space per transient accommodation in a lodge. ADA parking
requirements follow the ICC regulations. Parking for the lodge must be in close proximity to the
building entry. Parking for the cabins and tiny houses may be in the same parking lot as the main
building. Parking areas will follow the landscaping requirements of Section 7.1.4.
H. BUFFER REQUIREMENTS .
The 50-foot setbacks required around the property perimeter will be preserved with natural tree
growth and vegetation to provide a semi- opaque visual screening. Where this is not possible, a
Type B Buffer Yard as described in Section 7.1.5.B.2 will be installed to create a visual separation
between the retreat center and adjacent properties.
I. SITE PLAN
A site plan shall be drawn to scale by a registered civil engineer or land surveyor , and show exact
dimensions of the parcels of land under consideration. The elements to be shown are as follows:
1. All property dimensions , lots, and street systems, proposed location of buildings and
size, plans for screening and protection of abutting properties , means of ingress and egress ,
access and circulation arrangements, open spaces, and other support facilities.
2. A drainage plan with two (2) foot vertical contour intervals. The number of acres for the
park, open space, and cabins/lodges shall be shown and each lot shall be numbered.
Section 3. Severability.
If any section, subsection or clause of this ordinance is held to be unconstitutional or otherwise invalid,
the validity of the remaining sections, subsections and clauses shall not be affected.
Section 4. Conflicting Provisions.
To the extent this ordinance contains provisions that conflict with provisions contained elsewhere in the
Lancaster County Code or other County ordinances, the provisions contained in this ordinance, to the
extent to of the conflict, supersede all other provisions and this ordinance is controlling.
Section 5. Effective Date.
STAFF/PC VERSION
Per the Pending Ordinance Doctrine, this ordinance is in effect as of first reading and is adopted into the
Unified Development Ordinance effective upon Third Reading.
AND IT IS SO ORDAINED
Dated this __________ day of ________________________, 2025.
LANCASTER COUNTY, SOUTH CAROLINA
__________________________________________
Brian Carnes, Chair, County Council
__________________________________________
Bryant Neal, Secretary, County Council
ATTEST:
____________________________________
Sherrie Simpson, Clerk to Council
First Reading:
Public Hearing:
Second Reading:
Third Reading:
Approved as to form:
______________________________
Virginia Merck-Dupont, County Attorney