William Hilton Parkway Gateway Corridor Independent Review Advisory Committee — Agenda Packet
Town of Hilton Head Island · Beaufort County · William Hilton Parkway Gateway Corridor Independent Review Advisory Committee · meeting of May 8, 2024 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
William Hilton Parkway Gateway Corridor Independent
Review Advisory Committee Meeting
Wednesday, May 8, 2024, 1:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Approval of the Minutes
a. Regular Meeting Minutes of April 10, 2024
b. Special Meeting Minutes of April 22, 2024
3. Unfinished Business
a. Update on Project Progress
b. Update on Committee Requests
c. Presentation of Findings - SCDOT Seismic Study Review
d. Presentation of Finding - Technical Report
e. Review of Overall Evaluation Matrix for 4 Alternatives
f. Observations Related to Southern "Bypass" Alternative
4. Appearance by Citizens
5. New Business
6. Adjournment
FOIA Compliance: Public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
Page 1 of 157
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 2 of 157
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/10/2024 Page | 1
Town of Hilton Head Island
WILLIAM HILTON PARKWAY GATEWAY
CORRIDOR INDEPENDENT REVIEW
ADVISORY COMMITTEE MEETING
Wednesday, April 10, 2024, 1:00 PM
Minutes
1. Call to Order
Mayor Perry called the meeting to order at 2:00 PM. Those present were: Mayor Alan
Perry, Chairman; Edward C. Warner, Jr.; Charles P. Walczak, PE; William Young; and
Diederik Advocaat, attending remotely. Herbert Ford, Alternate, was not present.
2. Approval of the Minutes
a. Regular Meeting Minutes of March 27, 2024
Mayor Perry noted a change to be made to the March 27, 2024, minutes in that Charles
P. Walczak, PE, should have been shown as present. The minutes have been corrected
and are now before the members for review. There being no further changes, a motion to
approve the minutes as corrected was made by Mr. Warner and seconded by Mr.
Walczak. The motion passed unanimously.
3. Unfinished Business
a. Update on Project Scope of Work
Shawn Colin, Assistant Town Manager - Community Development, noted the update on
the scope of work and a continuation of the initial findings would be presented in the
Lochmueller presentation, which will follow.
b. Presentation of Findings for the System Assessment of the William Hilton
Parkway Gateway Corridor Project
i. Comparative Assessment of Corridor Alternatives
Nate Nohren, Project Manager for Lochmueller, introduced other members of the
Lochmueller Group joining the meeting remotely - Kate Swinford, leading the technical
components of the traffic engineering analyses and corridor study; Michelle Romine, a
lead Traffic Engineer, assisting Ms. Swinford; Lorne Jackson, Chief Roadway Engineer;
and Chad Costa, Environmental Design Engineer. Mr. Nohren outlined the agenda for
their presentation, as shown on the PowerPoint included in the agenda packet and
updated for the meeting as posted on the Town's website. He reported overall project
Page 3 of 157
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/10/2024 Page | 2
progress as of April 5, 2024, is 50% complete; Task #1, Project Initiation and
Coordination is now 75% complete; Task #2 is 100% complete; Task #3 is 55% complete;
Task #4 will commence immediately following today's meeting; and the final summary of
findings to be presented to Town Council at a date to be determined.
Ms. Swinford gave a brief overview of the 4 Alternatives being discussed and then
outlined details of each as shown on updated slides, which have been posted on the
Town's website. These included: Alternative 1 - SCDOT Modified Recommended
Preferred; Alternative 2 - Bowties at Squire Pope Road and Spanish Wells; Alternative 3 -
Echelon/Center Turn Overpass, Grade Separated Intersection at either Squire Pope or
Spanish Wells; and Alternative 4 - the Lochmueller version of the Elevated Bypass, citing
pros and cons and a summary of forecasted operating conditions. Comparisons to 2045
no-build for each Alternative scenario were noted, including travel time, traffic and
operations overview matrix scoring, bike/pedestrian impact, safety impacts,
roadway/additional ROW impacts, and right of way and cost matrix scoring. Questions
from the Committee members were addressed by Ms. Swinford and Ms. Jackson.
Mr. Jackson gave a brief overview of the right of way impacts for each of the various
Alternatives as shown on slides and reviewed the right of way and cost matrix, with a final
overall scoring and ranking among the 4 alternatives.
Mr. Costa continued the presentation with an environmental overview and noted the
State's EA (Environmental Assessment) did a good job of providing baseline resources,
both ecological and social, within their defined project area. He explained the intent of the
environmental overview is to look beyond that area at a very high GIS level to identify
potential areas of concern or "red flags" associated with the Alternatives being
considered. He reviewed maps showing "red flags" within with the 4 Alternatives,
generally associated with physical encroachments or additional right of way thought to be
needed for each Alternative, and reviewed in detail the overview matrix comparing the
data for each Alternative, along with scoring/ranking. He reviewed additional slides not
included in the agenda packet, but posted to the Town's website, showing environmental
overview mapping for ecological and social impacts, individual environmental overview
risk assessments for each Alternative, and a compilation of environmental overview risk
weight and mitigation. The importance of understanding how the Alternatives affect those
residents in the Stoney area was stressed, and Mr. Costa noted the final report would
indicate right of way property that is privately owned and right of way property owned by
public entities. Concerns were raised about noise, and Mr. Costa indicated that while
noise is a consideration, it is not something that can be factored in, as it is outside the
scope of their work.
c. Update on Delivery of Report of Findings for System Assessment
Ms. Swinford concluded the presentation with the overall scoring matrix for all 4
Alternatives, totaling the scores outlined for each and ranking them according to those
scores. This resulted in Alternatives 1 and 4 tied with the highest ranking, Alternative 2
Page 4 of 157
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/10/2024 Page | 3
ranked third, and Alternative 3 ranked fourth. She indicated that this represents the close
of their analysis for Task #3, and allows them to move forward into the SYNCHRO
analysis, which is further calibrating one of the Alternatives, and providing the final 5-10%
of confidence needed for one of the Alternatives when placed in the VISSIM model. She
noted that the written scope of the project was dependent upon one clear winner to move
forward into Task #4 to place in the VISSIM model. However, with two tied Alternatives,
the Lochmueller Group could move both Alternatives 1 and 4 forward into Task #4 of their
scope of work. It would mean less flexibility to do multiple iterations of different
configurations at some of the other intersections not yet considered, such as Indigo Run
or Sea Pines Circle; however, based on their initial analysis of those locations, they do
not seem to have as many congestion problems as the portion of the corridor being
focused on thus far. She asked for questions and for a determination of whether they
should move forward into Task #4 with one Alternative or two. A discussion followed
among the Committee members, Mr. Colin, and members of the Lockmueller Group
concerning the need for more information before a definitive decision could be made and
the impact on timing. Additional criteria requested from Lochmueller included the right of
way impact broken down between privately-owned and Town-owned land and an initial
evaluation of cost for each Alternative for comparison purposes. Lochmueller agreed to
provide the additional information timely, with a decision by the Committee to be made at
a later date.
4. New Business
None.
5. Appearance by Citizens
Public comments concerning agenda items were to be submitted electronically via the
Open Town Hall Portal. No comments were received through the Portal, and no requests
were received to appear before the Committee regarding non-agenda items. The following
citizens present at the meeting made comments:
Steve Baer made several points. He noted that Alternative #1 does not carry sufficient
traffic since it stops at Spanish Wells Road and completely avoids critical connections
leading to delays. Any of the other Alternatives having a good connection to the Cross
Island Expressway and local 278 in both directions will impact workers in and out traffic and
save approximately 14 minutes. One of the criteria used in differentiating between plans
should be whether it saves a significant amount of time. He asked Lochmueller to provide
the calculations for 2045 traffic during peak hours, and asked that horizontal bypasses be
considered.
Steve Robinson noted that the percentage of Town-owned property vs. privately owned
property should not be a consideration for delaying the decision. He noted that a similar
bow-tie alternative failed in Indianapolis and was replaced with a system that works very
well and should be explored with turn lanes.
A citizen who had attended a Town meeting at the Hilton Head Library noted that the Gullah
Page 5 of 157
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/10/2024 Page | 4
Geechee community who reside in the Stoney and other native Islander areas do not want
all of this construction either on 278 or the side roads such as Squire Pope, Spanish Wells,
and Wild Horse Road that is being proposed a a part of this huge project, and Hilton Head
Island residents are clearly not in favor of a 11-lane, 130' wide super slab as an entrance to
our beautiful Island. He urged that continued consideration of a bypass, whether horizontal
or elevated. He pointed out that it appears that neither the voices of the residents of Hilton
Head Island nor the Gullah Geechee are not being heard, and urged the Comittee to do so.
Thomas Boxley, Executive Director of the Gullah Geechee Historic Neighborhoods
Community Development Corporation, urged the Committee to err towards the side of not
acquiring more property from private owners in the Stoney Community. He also urged that
safety be a major component to be considered, and the need for crosswalks for pedestrians
and bikers to cross the road safely. He was followed by Ms. Cohen, who expressed a
similar request that the heritage of the Stoney Community be spared.
Mayor Perry concluded the meeting by seeking agreement from the Committee members
that additional information from Lochmueller and cost involved was needed before a
decision was made on which Alternative(s) to move forward, and that the need for a special
meeting as soon as possible was in order. A quick poll taken among the Committee
members resulted in no clear consensus. The effect of delays in the schedule on running
the VISSIM were discussed.
6. Adjournment
The meeting was declared adjourned at 3:04 PM.
Approved:
The recording of this Meeting can be found on the Town’s website
at www.hiltonheadislandsc.gov
Page 6 of 157
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/22/2024 Page | 1
Town of Hilton Head Island
WILLIAM HILTON PARKWAY GATEWAY
CORRIDOR INDEPENDENT REVIEW
ADVISORY COMMITTEE MEETING
Monday, April 22, 2024, 1:00 PM
Minutes
1. Call to Order
Mayor Perry called the meeting to order at 1:00 PM. Those present were: Mayor Alan
Perry, Chairman; Diederik Advocaat; Edward C. Warren, Jr.; Charles P. Walczak, PE; and
Willie Young. Absent was: Herbert Ford, Alternate.
2. Approval of the Minutes
a. Meeting Minutes of April 10, 2024 will be approved at the next regular meeting.
Mr. Advocaat stated he had appeared remotely at the April 10, 2024, meeting; however,
he had technical issues with his microphone and was unable to pose questions or
comments. Therefore, he would like his points to be recorded. Point 1: At the last
meeting, there was no discussion or opinion made concerning the bridges - one span vs.
two spans. If you have a 1 span, 11 lane bridge, is that technically feasible or make
sense? Point 2: The on-grade bypass option needs to be given serious consideration. It
is less obtrusive environmentally, has less impact on Stoney, can be a quick connection
to the Cross Island Parkway, has the lowest cost option, and cuts the commute time.
Point 3: The grading matrix produced in my opinion is really comparing apples and
oranges, and you cannot add numbers and come to a conclusion. Point 4: The bike lane
- a cost/benefit analysis should be done, its usage, and whether funds for a bike lane can
be better allocated elsewhere. Point 5: The adaptive management system - you are still
working in clusters at the end of 278, there has to be a way these 2 can be connected
during peak hours to create a better flow, and disabling the Windmill Harbour light during
peak hours should be explored. Point 6: I question whether the bow tie alternative would
actually work, and should be tested in your simulation models. Point 7: What is the cost
picture for the elevated bypass, does it makes sense at all, and has it been discussed
with SCDOT as a potential solution, and what is their opinion? Point 8: The $425M which
has been mentioned as a number, which is a 50% increase. Where does that come from
and how is that put together. All these points I would like Lochmueller to consider, take
them into account, and where applicable, add onto the simulation models.
3. Unfinished Business
Shawn Colin, Assistant Town Manager - Community Development, thanked everyone for
their appearance on such a short notice. He explained that at the last meeting Lochmueller
Page 7 of 157
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/22/2024 Page | 2
had presented 4 viable Alternatives to advance for additional evaluation. A comparative
assessment was presented for each of those Alternatives, and the Committee asked for
additional information related to cost, and property impact to both public and private lands.
Lochmueller has developed that additional information, along with a third element relating to
the construction period, based on their professional opinion of the project. He turned the
presentation over to Nate Nohren and his Lochmueller team, with Brad Strader and Brian
Kinzelman available remotely.
Mr. Colin clarified for the Committee that with regard to Mr. Advocaat's points, the matter of
additional funding for this project is not within the scope of work for Lochmueller.
a. Additional Details on Property Impacts, Cost, and Construction Period for
Alternatives.
Nate Nohren, Project Manager for Lochmueller, introduced his team joining the meeting
remotely: Kate Swinford and Michelle Romaine, Traffic Engineering Leads; Chad Costa,
Chief Environental Engineer; Lorne Jackson, Chief Roadway Engineer. He noted this
meeting is designed to present the additional information requested at the April 10
meeting, which included delineating between public and private parcels, providing high
order of magnitude cost estimates as well as estimates for the construction duration, and
a matrix incorporating everything provided.
Mr. Nohren presented slides of the Alternatives, which slides are a part of the
presentation contained in the agenda packet. He briefly outlined on the slides Alternative
#1, Alternative #2, Alternative #3, and Alternative #4. He pointed out the travel time
comparison when compared to 2045 No Build for each Alternative completed in Synchro
for the Hilton Parkway corridor between Moss Creek and Indigo Run. Questions from the
Committee members were answered by Mr. Nohren, Mr. Jackson, and Mr. Colin.
Discussion ensued about whether SCDOT or Beaufort County has reviewed the
Lochmueller plans. Mr. Colin reminded the Committee that a part of the scope for
Lochmueller was a provision to refrain from any communication with the County or
SCDOT during the engineering evaluations and assessments until the Committee
identifies Alternatives to be advanced, at which point any design modifications would then
be shared with both the County and SCDOT for consideration. He also raised the issue of
where additional funding would come from above the original project cost for the deficient
bridge and funding sources from the State Infrastructure Bank, grant, and referendum,
leaving a current deficit of $100M+. While there have been communications, he noted
none were specifically about SCDOT vetting all of the engineering solutions. Mr. Colin
indicated he would like to have the benefit of this meeting's results and the Committee's
position so that he can schedule further conversations this week.
Mr. Nohren concluded his presentation with slides detailing the additional right of way
required for each Alternative, with estimated cost ranging from $426M to $575M, and
estimated construction duration ranging from 36 to 48 months, with the resulting scoring
and ranking. A lengthy discussion followed concerning the scoring system and matrix,
how impact was determined for additional right of way acreage needed, difficulties and
Page 8 of 157
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/22/2024 Page | 3
delays that could result, whether a sufficient right of way exists in Stoney to
accommodate a larger paved roadway, and the review being made Lochmueller's
structural engineers of the seismic study,with the initial analysis indicating no feasible way
to retrofit an existing bridge to meet SEE requirements.
Mr. Colin stated that after the last meeting when Lochmueller presented its evaluation
and comparative assessment of the alternatives, the goal was to identify an Alternative
that would be the preferred Alternative to put through the VISSIM model so they could
then perform the deeper analysis and evaluation, and they could move beyond the
current study area, as well, to look at the full end-to-end that was requested down to Sea
Pines Circle and to Wilborn and Indigo Run. Therefore, with the additional information
presented today as requested plus construction duration, they would like the Committee
to weigh in on the Alternative or Alternatives to continue to move forward and advance.
He asked for the Committee's feedback at this time. Each Committee member stated their
current choices and reasoning involved, but no clear consensus was reached.
Discussion continued among the Committee members and Mr. Nohren concerning
keeping a 4-lane bridge, and Mr. Nohren indicated the analyses done by them and other
studies reviewed, indicate this is not practical. Mayor Perry noted there are questions
concerning whether the State Infrastructure Bank, the State House, or other source would
grant the additional funding for the Alternative chosen, and conversations with these
entities needed to be held soon. Mr. Colin agreed that with a potential shortfall in the
current funding, and the failure of the Committee to narrow down the Alternatives for
Lochmueller to proceed into the VISSIM model, it would be appropriate to share the
Alternatives presented by Lochmueller with Beaufort County officials and SCDOT to
determine feasibility and funding availability. The Committee members indicated their
support for that plan, with Mr. Colin to schedule meetings and report back soon.
4. Appearance by Citizens
No citizens have requested to appear before the Committee regarding items not on the
agenda. No comments were received through the Open Town Hall Portal.
A citizen remarked that the traffic lights are not synchronized nor optimized at Spanish
Wells and Squire Pope Road intersections. He also mentioned that cost/value for benefit
gained in minutes should be a consideration.
Christopher Cliffe noted he had attended 32 committee meetings since November 2018
chaired by David Johnson, 12 or more joint broadcasts of Beaufort County and the Town,
numerous Town Council meetings, and at no time during those meetings until recently has
cost come up as a determining factor. He questioned how the construction duration was
computed, where the idea of pedestrian and bike paths originated, whether construction
costs were based on 2022 numbers, and whether there were certain aspects of the bridge
that would be the Town's responsibility.
An Indigo Run resident stressed the need for a fair, transparent, and independent analysis
Page 9 of 157
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
4/22/2024 Page | 4
free from political manipulation, but he questioned whether that is the case. He stated too
much attention is being placed on an oversize bridge and not enough on traffic lights, which
are the real cause of our congestion problems. Better and cheaper options, with less
community impact on the Gullah community, have been suggested and ignored. The
Town's decision will be one of the most consequential decision in years and will impact our
Town for decades.
Louise Miller Cohen, a native of Hilton Head Island, stated God had given her a job to keep
the Gullah Geechee culture alive on Hilton Head Island. All that is remaining is the land left
by their ancestors and passed down to the current generation. She expressed her gratitude
to everyone who feels their pain, and asked the members to put themselves in their shoes
and help them keep their land, their culture, and their community.
5. New Business
None.
6. Adjournment
The meeting was declared adjourned at 2:42 PM.
Approved:
The recording of this Meeting can be found on the Town’s website
at www.hiltonheadislandsc.gov
Page 10 of 157
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Willliam Hilton Parkway
Gateway Corridor Advisory Committee
TO: Advisory Committee
FROM: Shawn Colin, Assistant Town Manager
DATE: May 8, 2024
SUBJECT: Transmittal of Meeting Materials from the Lochmueller Group
Agenda
RECOMMENDATION:
This memo serves as the transmittal document to cover the materials submitted for
consideration by the Lochmueller Group. This material will be covered at the May 8,
2024 meeting of the William Hilton Parkway Gateway Corridor Advisory Committee.
ATTACHMENTS:
1. The Lochmueller Group Document Transmittal Memo – dated May 3, 2024
2. Presentation by the Lochmueller Group – dated May 8, 2024
3. Four Lane Viability Review Technical Memo Task 1.3.3 – dated May 3, 2024
4. Summary of Findings Memo (Task 3.6) – dated May 3, 2024
Page 11 of 157
TRANSMITTAL
To: Shawn Colin, AICP – Town of Hilton Head Island
From: Nate Nohren, PE, PTOE
Date: May 3, 2024
Subject: Copies of Presentation Materials for 5/8/2024 Advisory Committee Meeting
RE: William Hilton Parkway Gateway Corridor Indepen dent Review
Hi Shawn,
Attached please find a PDF copy of the power point slides we will be presenting at the May 8, 2024,
Advisory Committee meeting. The content provided w ithin our presentation can be summarized as
follows:
• Update on Project Progress – we will provide the Committee an update on what our team has
been working on and/or completed since the April 22 Committee meeting. We also provide
current status of percent-of-work completed to date , as well as on-going or upcoming work
subtasks, relative to Tasks 1, 2, 3, and 4 as describe d in the Town approved Scope of Services
Addendum (9/29/2023).
• Presentation of Findings Related to SCDOT Seismic St udy Review (Task 1.8) – we will present
slides that speak to the cursory, high-level review of SCDOT’s US 278 Bridge Seismic Study (dated
April 2020) we performed, and provide our professional opinion regarding the feasibility of
seismic retrofit & structural rehab options for exi sting bridges vs. constructing new bridges.
• Presentation of Findings Related to 4-Lane Viability Technical Memo (Task 1.3.3) – we will
present slides that summarize our findings related to the technical memorandum we prepared
that provides our professional opinion regarding th e feasibility of William Hilton Parkway being
able to remain a four lane facility within areas between Moss Creek Drive and Squire Pope Road,
if one or more of select strategies were implemente d. These strategies include the
implementation of a second bridge; modifications to the existing mass transit system;
implementation of a new ferry system; and the imple mentation of a facility usage fee.
• Cursory Observations Related to “Southern Bypass” Al ternative – we will present slides that
speak to the cursory, high-level observations we ha ve noted related to traffic, geometric, ROW,
and environmental challenges associated with the “S outhern Bypass” alternative that has been
brought up by citizens and/or Committee members. T he primary purpose for sharing this
information with the Committee and others in attend ance is to provide reasoning as to why we
did not include this “Southern Bypass” alternative as one of the four alternatives that were
thoroughly evaluated as a part of our independent s tudy.
• Review of Overall Scoring Matrix for All Alternatives – we will once again present our updated
overall scoring matrix, which considers all key con tributing factors associated with this project,
and provides a ranking of the four Alternatives.
Also attached are PDF copies of the 4-Lane Viabilit y technical memorandum (formal deliverable for Task
1.3.3), as well as the Draft Summary of Findings memo randum related to four (4) corridor alternatives fo r
intersections within the modified original project study area (formal deliverable for Task 3.6). Plea se let
me know if you have any questions regarding the inf ormation shared above. Otherwise, we look forward
to speaking with you all on May 8.
Sincerely,
Nate Nohren, PE, PTOE
Page 12 of 157
William Hilton Parkway Gateway Corridor
Independent Review Advisory Committee Meeting
May 8
th , 2024
Page 13 of 157
Agenda
Update on Project Progress
Presentation of Findings Related to SCDOT Seismic Study Review (Task 1.8)
Presentation of Findings Related to 4-Lane Viability Technical Memo (Task 1.3.3 )
Cursory Observations Related to “Southern Bypass” Alternative
Review of Overall Scoring Matrix for All Alternatives
Page 14 of 157
Update on Project Progress
(Key Tasks Completed & Continuing to Work on Since Last Meeting )
Completed review of SCDOT seismic study (Task 1.8)
Completed tech memo RE: potential transportation demand strategies
(Task 1.3.3)
Completed Draft Summary of Findings memo RE: 4 Alternatives (Task 3.6)
Began traffic analyses and Synchro and VISSIM modeling RE: 2045 Build
Year conditions at intersections downstream of CIP (Tasks 4.1 & 4.2)
Page 15 of 157
• Task #1: Project Initiation and Coordination
o ~95% Complete
o Key Subtasks On-Going:
Remaining scheduled meetings with Town (Bi-Weekly) staff and Committee
(Monthly)
Update on Overall Project Progress (as of 5/3/24)
95% 5%
Overall ~60% Complete 60% 40%
Page 16 of 157
Update on Overall Project Progress (as of 5/3/24)
Task #2: Review of Travel Demand Model & Evaluation of
2023 Existing Operating Conditions (Entire Study Area)
o 100% Complete 100%
Page 17 of 157
Update on Overall Project Progress (as of 5/3/24)
• Task #3: Traffic Model and Operational Update – Modified
Original Project Study Area
o ~80% Complete
o Key Subtasks On-Going:
Finalize Summary of Findings Memo RE: Task #3, after receiving feedback
from Town staff and Committee
o Key Subtasks Forthcoming:
Final Summary of Findings Memo RE: Task #3 Alternatives Analysis to be
presented to Town Council (June 2024, date TBD)
80% 20%
Page 18 of 157
Update on Overall Project Progress (as of 5/3/24)
• Task #4: Traffic Model and Operational Update –
Entire Project Study Area
o ~10% Complete
o Received direction from Town staff on 5/1 to begin modeling Alternative 1 in
Synchro and VISSIM, with following modifications:
Single EBLT and SBRT at Squire Pope Road
Modified median access location for WBLT into Crazy Crab
o Key Subtasks On-Going:
Continue traffic analyses and modeling (Synchro & VISSIM) RE: 2045
Build Year conditions at intersections downstream of CIP.
10% 90%
Page 19 of 157
Update on Overall Project Progress (as of 5/3/24)
• Task #5: Final Report
o Will commence immediately following Task 4
Page 20 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Objective: Perform cursory, high-level review of seismic study and offer
professional opinion regarding feasibility of seismic retrofit & structural rehab
existing bridges vs. constructing new bridge
o PDF copy of SCDOT approved US 278 Bridge Seismic Study (dated April 2020) provided to
Lochmueller on 4/15/24.
o Study included evaluation of options to retrofit, widen, or replace the existing US 278 bridges
onto HHI, and provided information to SCDOT to implement best replacement strategy, as well
as detailed Life Cycle Costs Analysis (LCCA) results, considering following three Options:
Option #1 – Construct new EB bridge over Mackay Creek & Skull Creek; widen existing
WB bridge over Mackay Creek; modify existing Skull Creek bridges for WB movements.
Option #2 – Construct new EB bridge over Mackay Creek & Skull Creek; replace existing
WB bridge over Mackay; modify existing Skull Creek bridges for WB movements.
Option #3 – Construct new 6-lane bridge; remove all existing bridges
Page 21 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• With each Option, a new EB bridge will be constructed
o Designed to SCDOT standards to withstand seismic events
o Serve as a “lifeline” bridge in case of significant seismic event for Options 1 or 2
• Assumed Construction Sequence
o Options #1 or #2 :
New EB structure constructed wide enough to accommodate 4-Lanes, 2-Way traffic in
temporary condition & 6-Lanes in permanent condition.
All traffic moved to new EB structure, while demolition / seismic retrofits / structural
repairs & replacements take place on existing structures.
Traffic then moved in to final positions
If necessary, traffic can be returned to the 4-Lanes, 2-Way traffic pattern on EB structure
o Option #3 :
Entire new 6-Lane structure can constructed with traffic retained in existing patterns
Page 22 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
Page 23 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
Page 24 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
Page 25 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
Page 26 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
Page 27 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team:
o All existing bridges designed and constructed prior to SCDOT’s implementation of seismic
analysis and detailing. Therefore, all existing bridges are considered inadequate when
compared to today’s seismic design standards .
o In order to model existing structures, SCDOT design team assumed minimum level of seismic
retrofits would be performed. Design team did not determine if existing structures could
withstand any seismic event without minimum retrofits being performed.
o SCDOT design team intended to evaluate the bridges for two seismic events as required by
SCDOT Seismic Design Specifications (SDS):
Functional Evaluation Earthquake (FEE) = lower magnitude earthquake event that has higher
chance of occurrence during life of the bridge.
Safety Evaluation Earthquake (SEE) = higher magnitude earthquake event that has lower
chance of occurrence during life of the bridge.
NOTE: US 278 Bridges assigned highest SCDOT SDS classification rating OC 1; therefore, must
meet FEE design thresholds at a minimum
Page 28 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team (cont.):
o It was determined that soils around and below the existing bridge foundations and roadway
approaches can liquefy at ground accelerations just above the FEE event:
This liquefaction could cause bridges/roadways to settle, slide or collapse during and/or
after seismic event.
Design team recognized that mitigation for liquefaction (i.e., add’l foundations, deep soil
mixing, etc.) would likely exceed costs for new construction, and would greatly increase
environmental disturbance.
Design team therefore elected to limit structural improvements through seismic retrofits
to FEE level, w/ SCDOT concurrence.
New bridges can be constructed to meet SEE requirements; existing bridges only will be
able to attain FEE requirements at best.
Page 29 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team (cont.):
o SCDOT Design team prepared LCCA, for Options 1/2/3, as shown below.
Costs are in 2020 dollars, assume annual inflation of 2% for future costs.
Construction costs developed from historical data, as well as correspondence w/ local
Contractors. Widening existing structures over water ~1.5 to 2 times more expensive than
new construction.
User Costs developed from SCDOT provided data, based on cost/lane/day.
Maintenance costs based on existing bridge details and assumed new bridges.
NOTE: LCCA costs only reflect rehabilitation related costs (e.g., widening, maintenance,
cosmetic improvements), and do not include retrofit related costs (e.g., seismic related
improvements). Therefore, true costs to attain FEE standards for Options 1 & 2 would be
significantly higher than those shown in the table below .
Page 30 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team (cont.):
o SCDOT Design team evaluated benefits & risks of Options 1/2/3
Page 31 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Assumptions/Findings Noted by SCDOT Design Team (cont.):
o SCDOT Design team evaluated benefits & risks of Options 1/2/3 (cont.)
Page 32 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Observations by Lochmueller Group:
o SCDOT Design Team’s structural analysis findings; LCCA results; and noted benefits/risks
associated with Options 1/2/3 appear valid and appear to follow standard engineering practices.
o LCCA results do not account for costs that would be required to improve seismic conditions for
Options 1 & 2. Therefore, true costs associated with Options 1 & 2 would be significantly
higher to implement, than what is shown in the LCCA table above .
o Options 1 & 2 would take ~ 2 years longer to construct vs Option 3. The rehabilitated structures
would still need to be replaced at some point, and time required to do so is not accounted for
in this table.
Page 33 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Observations by Lochmueller Group (cont.):
o Existing bridge structures would be ~50 years old after improvements made by Options 1 or 2,
with rehab efforts likely to extend life of existing structures by ~25 to 35 years. By comparison,
typical design life for Option 3 newly constructed bridges ~ 75 to 100 years .
o Options 1 & 2 being pursued for use solely as temporary condition would require >$130M to
construct initially (using 2020 costs), and these costs do not account for needed FEE
improvements . Depending upon when remaining structures were replaced, the
future/user/maintenance costs req’d over that time would assuredly lead to higher overall cost
than building new at outset.
Page 34 of 157
SCDOT Seismic Study Review Findings (Task 1.8)
• Key Observations by Lochmueller Group (cont.):
o Options 1 & 2 would put maintenance/replacement schedules of the structures on varying
timeframes, which would cause additional user disruptions in the future .
o Existing structures under Options 1 & 2 would never meet SEE seismic design requirements .
New structures can be built to meet SEE seismic design requirements.
o In summary, Lochmueller does not recommend rehabilitation and/or retrofit options be pursued.
Page 35 of 157
4-Lane Viability Technical Memo (Task 1.3.3)
• Objective: Perform cursory, high-level review to determine if one or more
select strategies could be implemented to allow for 4-lane section of WHP
between Moss Creek and Squire Pope Road.
o Study included evaluation of the following strategies:
Second bridge
Modifications to the existing mass transit system
Implementation of a new ferry system
Implementation of a facility usage fee (congestion pricing)
Page 36 of 157
4-Lane Viability Technical Memo (Task 1.3.3)
• Traffic Operations Key Findings:
o Travel times were calculated using VISSIM, which is a microsimulation tool that accurately
replicates individual vehicles and their interactions within complex traffic streams.
o It currently takes approximately 19 minutes to travel along US 278 between Moss Creek Drive and
Indigo Run Drive during the AM peak hour and 21 minutes to travel along US 278 between Indigo
Run Drive and Moss Creek Drive during the PM peak hour today.
o This section of road is approximately 8.2 miles. Based on the travel times, the existing average
speed along this corridor is 26 miles per hour (mph) during the AM peak hour and 23 mph during
the PM peak hour. This is well below the posted speed limits of 45 mph and 55 mph along the
corridor.
Corridor
2023 Existing
Simulated travel time
(secs)
2045 No Build
Simulated travel time
(secs)
% Difference
AM PM AM PM AM PM
Hilton Parkway between Moss Creek and
Indigo Run
EB 1157 619 1579 642 36.47% 3.72%
WB 572 1252 584 1544 2.10% 23.32%
Page 37 of 157
4-Lane Viability Technical Memo (Task 1.3.3)
• Traffic Operations Key Findings:
o Significant congestion currently exists throughout the study area. This congestion is expected to
be exacerbated by 2045 with the forecasted growth.
o 2023 existing traffic volumes would need to be reduced by approximately 30% for the current 4-
lane configuration to operate acceptably.
o Based on an annual growth rate of 0.56%, 2045 traffic volumes would need to be reduced by
approximately 40% for the current 4-lane configuration to operate acceptably.
Page 38 of 157
4-Lane Viability Technical Memo (Task 1.3.3)
• Second Bridge Key Findings:
o A second bridge has been discussed locally
o A new bridge could take up to 20 years to construct once all the studies, planning, design, and
construction is complete
o The operating conditions today already show significant congestion
o Our focus is to mitigate the existing and forecasted conditions, and as shown in 20 years, the
congestion along the corridor will be significant
o It is our opinion that a 6-lane section is needed independently of a second bridge
Page 39 of 157
4-Lane Viability Technical Memo (Task 1.3.3)
• Modifications to Existing Transit System Key Findings :
o Transit currently provided:
o Palmetto Breeze
o Breeze Trolley (seasonal)
o On-Demand Van Service
o Beach Parking Shuttle
o Transit across all services only provides a fraction of the total regional trips. Transit would need to
be more robust in terms of service span (number of trips daily and days per year of service) and
coordinated to be most effective.
o In 2021, the transit mode share was less than 1% in the region and would therefore have to grow
exponentially to be effective enough to reduce the need for six lanes along US 278 in the area
under study.
o Therefore, it is Lochmueller’s opinion that even if significant modifications were made to the
existing Palmetto Breeze transit system, it would be highly unlikely these modifications alone
could account for enough trips and the mode share percentage needed to sufficiently reduce the
number of trips across the US 278 bridges, such that a four-lane facility could be maintained.
Page 40 of 157
4-Lane Viability Technical Memo (Task 1.3.3)
• Ferry System/Facility Usage Fee Key Findings :
o Ferry System:
o No formal studies of a high-speed ferry system have been initiated.
o Therefore, it is reasonable to assume that a high-speed ferry system would not be fully
operational within the next 10-15 years.
o Even still, if/when a ferry system is implemented, it is highly unlikely that the resulting
reduction in traffic would allow for a four-lane section.
o Facility Usage Fee:
o South Carolina State laws prohibit tolls/fees from being implemented on existing roads. Only
new roads may instate tolls/fees.
o If a facility usage fee could be implemented, the fee would largely impact commuters, not
tourists, who enter and exit the island for work, as the majority of traffic during the AM and PM
peak hours is a result of commuter traffic.
o Even still, if a facility usage fee could be implemented, it is highly unlikely the resulting
reduction in traffic would allow for a four-lane section to be maintained.
Page 41 of 157
4-Lane Viability Technical Memo (Task 1.3.3)
• Overall Findings :
o In order for the existing four-lane section to operate acceptably, the total reduction in vehicles
from mass transit, a new ferry system, and the implementation of a facility usage fee would need
to be between 30-40%.
o While implementing the aforementioned types of transportation strategies would help slow future
traffic growth on US 278, it is Lochmueller’s opinion that even if all of these strategies are
implemented, the reduction in vehicles would not reach 30%.
o Furthermore, these strategies would not address the structural issues associated with the existing
bridges over Mackay Creek and Skull Creek.
o Consequently, it is Lochmueller’s opinion that these strategies should not be considered as viable
alternatives to be used individually and/or collectively to solely address traffic congestion and
mobility related concerns along US 278 within the project study area, that could allow a four-lane
section to be maintained along US 278 within the study area.
Page 42 of 157
“Southern Bypass” | Cursory Traffic Overview
• At 12/12/23 Committee meeting, Committee members prioritized limiting impacts to ROW (any
public and/or private parcels) as guidance to Lochmueller when selecting potential Alternatives.
Topic re-emphasized at 3/27/24 Committee meeting.
• The “Southern Bypass” is not anticipated to improve the operating conditions of Gumtree Road, as
there is no way to effectively bypass Gumtree at-grade.
• While the bypass has the opportunity to remove most of the through traffic from US 278, if the
bypass is at grade, then it will still need to cross several streets as shown below, reducing the
effectiveness of the bypass.
Requires elevated
crossing of
Spanish Wells
Local access concerns
may require bridge or
more ROW
Local access concerns
may require bridge or
more ROW
Connection to WHP & CIP will
need to be further east and
require grade separation (bridge)
Connection will
likely require
grade separation
Page 43 of 157
“Southern Bypass” | Cursory Overview Map
Approx.
Required Tie-In
Point
Approx. 2,000 ft.
Bridge Required
Page 44 of 157
Categories Prior SCDOT Findings / Considerations
Southern Bypass
Constraints / Issues
Southern Bypass
Overall Risks
Engineering Feasibility • Concept not considered • The horizontal alignment to the east
tying back into US 278, as presented, is
not feasible
• Current at-grade alignment creates
access issues at Chamberlin Drive that
requires consideration (i.e., bridge)
• Tie-in point requires moving east to the
Cross Island Parkway ramp (US 278 East)
• Challenges in addressing the horizontal
and vertical alignments need to be
addressed – affects time and cost
• New bridge, approximately 2,000 ft. in
length required between Spanish Wells
Road and Cross Island Parkway ramp
Right-of-Way • Total of 34 acres of right-of-way required for
the recommended preferred alternative
• Estimated 6 additional acres required
• Eliminates approximately 1.2 acres from
SCDOTs proposed right-of-way needed
for recommended preferred alternative
4(a)
• 23 total parcels impacted (18 publicly
owned 5 privately owned)
• Creates 8 private parcels with access
concerns (2 of which are partially
impacted)
• Additional right-of-way increases
impacts to sensitive environmental
resources
• Additional time necessary to address
access issues with the 8 parcels (total
purchase or additional access road to
Spanish Wells Road)
Relocations • Two commercial relocations • Results in at least 2 additional
relocations
• Additional impacts to Stoney TCP
“Southern Bypass” | Cursory Engineering Overview
Page 45 of 157
“Southern Bypass” | Cursory Overview Map
Approx.
Required Tie-In
Point
Approx. 2,000 ft.
Bridge Required
Page 46 of 157
Categories Prior SCDOT Findings / Considerations
Southern Bypass
Constraints / Issues
Southern Bypass
Overall Risks
Section 106 (Cultural) • “Adverse Effect” finding for the project due
to impacts to Archaeological Site 38BU66;
“No Adverse Effect” for Stoney TCP
• Greater impacts to Stoney TCP
• New impacts to Honey Horn Plantation
if tie-in corrected
• Change in effect finding for Stoney TCP
to “Adverse Effect”
• New “Adverse Effect” likely for Honey
Horn Plantation
• Amendment to the Memorandum of
Agreement likely
Section 4(f) • De minimis impact finding for both Stoney
TCP and the Old Elementary School Park
• Honey Horn Plantation was not impacted
• Additional “use” of Stoney TCP & Old
Elementary School Park
• New “use” of Honey Horn Plantation
• Additional use of non-transportation
land from Stoney TCP & the Old
Elementary School Park likely to elevate
to an Individual 4(f) evaluation
• Time and cost expended to complete
the Individual evaluation
≠ a feasible &
prudent option
Environmental Justice /
Community Impacts
• 1 EJ community identified – Stoney
• Determined project effects are not
disproportionately high & adverse
compared to non-EJ areas
• New impacts to the EJ Stoney
community requires:
Outreach & engagement
Benefits & burdens analysis
Noise considerations
• New terrain route introduces potential
added benefits & burdens to evaluate
• Potential unacceptance by the EJ
community
• Added mitigation costs
Ecological Impacts • Impacts 22.9 acres of wetlands / streams
• Impacts 145 acres of floodplain
• “May Affect – Not Likely to Adversely
Affect” finding for threatened &
endangered from U.S. Fish & Wildlife
Service
• Creation of segmented forest block
(Approx. 4 acres of tree clearing)
• Approx. 0.7 acre of NWI wetland
impact; 140 linear ft. of stream impact
• Approx. 1 acre of floodplain impact
• Agency concerns with added forest,
wetland, stream, & floodplain impacts
• Potential elevation in Threatened &
Endangered Species finding
• Added mitigation costs
“Southern Bypass” | Cursory Environmental Overview
Page 47 of 157
Right of Way and Cost Matrix – Data & Scoring
Resource/Category
Alternative 1
(Mod. SCDOT Recommended
Preferred)
Alternative 2
(Bowties at Squire Pope and
Spanish Wells)
Alternative 3
(Echelon / Center Turn
Overpass)
Alternative 4
(Elevated Bypass)
Est. Add’l Right of Way Acres – Public
Est. Add’l Right of Way Acres – Private
Approx. TOTAL Add’l Right of Way Acres
0.2 ac
0.0 ac
0.2 ac
0.9 ac
0.2 ac
1.1 ac
0.7 ac*
0.4 ac*
1.1 ac*
0 ac
Right of Way Score 2 4 4 1
Estimated Cost $426M** $430M*** $440M to $450M*** $545M to $575M**
Cost Score 1 2 3 4
Estimated Construction Duration 36 months 38 months 42 months 48 months
Construction Duration Score 1 2 3 4
TOTAL 4 8 10 9
RANK 1 2 4 3
Denoted estimated cost provided by Beaufort County ($425M) + proposed Gum Tree improvements recommended by
Lochmueller ($1M). **
***
Denoted estimated cost generated by Lochmueller Gro up; based upon assumed percent differential in cost, in comparison to
Alternative 1.
*
Denoted change in ROW impacts, as compared to results shown during 4/22 Committee meeting (i.e., 4/22 data showed
0.86 ac public + 0.54 ac private = 1.4 ac total), due to add’l GIS parcel data rec’d from Town GIS staff on 4/24.
Page 48 of 157
Overall Scoring Matrix
1 = Highest Ranking
Resource/Category
Alternative 1
(Mod. SCDOT
Recommended Preferred)
Alternative 2
(Bowties at Squire Pope
and Spanish Wells)
Alternative 3
(Echelon / Center Turn
Overpass)
Alternative 4
(Elevated Bypass)
Traffic Operations (Throughput
and Traffic Simulations) 4 3 3 1
ROW Impact 2 4* 4 1
Environmental Impact 1 3** 4 2**
Safety 4 3 3 1
Bike/Pedestrian Impact 4 3 1 2
Community and Social Impact 1 3 4 2
Aesthetic 2 1 3 4
Cost 1 2 3 4
Construction Duration 1 2 3 4
TOTAL 20 24*** 28 21***
RANK 1 3 4 2****
*
Denoted change for Alternative 2, as compared to results shown during 4/22 Committee meeting (i.e., 4/22 data showed Alternative 2 having a ROW Impact score of “3”),
due to add’l GIS parcel data rec’d from Town GIS staff on 4/24.
***
Denoted changes for Alternatives 2 & 4, as compared to results shown during 4/22 Committee meeting (i.e., 4/22 data showed Alternatives 2 & 4 each having a total
scores of “22”), due to current scoring summations.
****
Denoted change for Alternative 4 rank, as compared to results shown during 4/22 Committee meeting (i.e., 4/22 data showed Alternative 4 having a tied ranking of “3” with
Alternative 2), due to Alternative 2 total scoring now at “24” vs. Alternative 4 total scoring now at “21”.
**
Denoted changes for Alternatives 2 & 4, as compared to results shown during 4/22 Committee meeting (i.e., 4/22 data showed Alternative 2 having an Env. Impact
score of “2” and Alternative 4 having score of “3”), due to add’l GIS parcel data rec’d from Town GIS staff on 4/24.
Page 49 of 157
QUESTIONS?
https://www.islandpacket.com/news/local/traffic/article235209867.html
Page 50 of 157
MEMO
Huntington Tower, 201 W Springfield Avenue, Suite 1012
Champaign, Illinois 61820
PHONE: 217.673.7633
To: Town of Hilton Head, South Carolina
From: Lochmueller Group
Date: May 3, 2024
Subject: Independent Study of the William Hilton Parkway Gat eway Corridor
Four Lane Viability Review Technical Memorandum – T ask 1.3.3
Lochmueller Group (Lochmueller) is preparing an ind ependent study that evaluates congestion and
mobility challenges along the William Hilton Parkwa y Gateway Corridor. As part of this independent
study, Lochmueller evaluated the viability of sever al strategies in order to determine if they should be
included or excluded from further consideration as part of this project. These items include the viabi lity of
maintaining four lanes along William Hilton Parkway (US 278) between Windmill Harbour and Squire Pope
Road; the implementation of a second bridge; modifi cations to the existing mass transit system;
implementation of a new ferry system; and the imple mentation of a facility usage fee. It should be not ed
that an in-depth detailed analysis of any of these items was excluded from the scope of work.
The intention of this memorandum is to provide the Town of Hilton Head with Lochmueller’s professional
opinion regarding the feasibility of William Hilton Parkway being able to remain a four lane facility within
areas between Moss Creek Drive and Squire Pope Road , if one or more of these strategies were
implemented.
Viability of Maintaining Four Lanes Between
Windmill Harbour and Squire Pope Road
Lochmueller evaluated the viability of maintaining four lanes between Windmill Harbour and Squire Pope
Road. Currently, the intersection of Squire Pope Ro ad and US 278 experiences significant congestion,
specifically during the PM peak hour. The westbound approach has failing conditions and queues which
extend 2,500 feet from Squire Pope past Spanish Wells. This congestion is expected to be exacerbated by
2045 with the forecasted growth.
Travel times were calculated using VISSIM, which is a microsimulation tool that accurately replicates
individual vehicles and their interactions within c omplex traffic streams, such as interchanges, freew ays,
and expressway corridors with signalized intersecti ons. A robust amount of data and field observations
were conducted to calibrate VISSIM to reproduce fie ld conditions.
The travel time results are provided in Table 1. As shown, it currently takes approximately 19 minute s to
travel along US 278 between Moss Creek Drive and Indig o Run Drive during the AM peak hour, and it
takes approximately 21 minutes to travel along US 278 b etween Indigo Run Drive and Moss Creek Drive
during the PM peak hour today.
US 278 between Moss Creek Drive and Indigo Run Drive i s approximately 8.2 miles. Based on the travel
times, the existing average speed along this corridor is 26 miles per hour (mph) during the AM peak hour
and 23 mph during the PM peak hour. This is well belo w the posted speed limits of 45 mph and 55 mph
along the corridor.
Page 51 of 157
May 3, 2024
Page 2
These travel times are expected to increase by appr oximately 36% during the AM peak hour and by
approximately 23% during the PM peak hour in the year 2045 with the anticipated background growth. It
is evident based on the travel times that the exist ing four-lane section already struggles to accommod ate
the 2023 traffic volumes, and the 2045 forecasted traffic v olumes would be expected to significantly
deteriorate operating conditions along the corridor .
TABLE 1. VISSIM 2023 EXISTING AND 2045 NO BUILD TRAVEL TIME RESULTS
Corridor
2023 Existing
Simulated travel
time (secs)
2045 No Build
Simulated travel
time (secs)
% Difference
AM PM AM PM AM PM
William Hilton Parkway between
Moss Creek and Indigo Run
EB 1157 619 1579 642 36.47% 3.72%
WB 572 1252 584 1544 2.10% 23.32%
A preliminary analysis was completed in an effort t o determine how much the 2023 existing and 2045 no
build traffic volumes would need to be reduced in o rder for the existing four-lane section to operate
acceptably. It was determined that the 2023 existing tr affic volumes would need to be reduced by
approximately 30% for the current four-lane configura tion to operate acceptably. Furthermore, based on
an annual growth rate of 0.56%, the 2045 traffic volumes w ould need to be reduced by approximately
40% for the current four-lane configuration to operat e acceptably.
Implementation of a Second Bridge
Lochmueller was asked to evaluate the implementatio n of a second bridge and/or point of access onto
Hilton Head Island from the mainland. It is Lochmue ller’s understanding that a second bridge or point of
access has been discussed locally to address conges tion along US 278. A new bridge could take up to
twenty years to come to fruition once all studies, planning, environmental, design, and construction i s
complete.
While there are clear benefits to providing a secon d bridge, such as redundancy, the operating conditi ons
along US 278 are already congested today. As previousl y stated, the 2023 existing traffic volumes would
need to be reduced by approximately 30% and the 2045 tr affic volumes would need to be reduced by
approximately 40% for the current four-lane configura tion to operate acceptably. Given the congestion
already experienced along this corridor today and t he time it would take to construct a second bridge, it is
our opinion that a six-lane section of US 278 onto Hil ton Head Island is needed independently of a second
bridge.
Modifications to Existing Transit System
Lochmueller evaluated whether modifications to the existing mass transit system and its services, or t he
implementation of a new mass transit system, could provide enough benefit to maintain the needed
levels of efficiency and operations of a four-lane section between Windmill Harbour and Squire Pope
Road.
Page 52 of 157
May 3, 2024
Page 3
Based on data provided by the Lowcountry Regional T ransportation Authority (LRTA), transit service in the
region has been on the decline. It should be noted that the transit service does show signs of rebound ing;
however, it remains to be seen what the new normal or equilibrium state may mean and if this is
sustainable and long lasting for passenger volumes as transit agencies struggle with driver shortages,
funding gaps and other operational challenges.
The following ridership data was provided from the LRTA:
• The Palmetto Breeze commuter bus’s yearly unlinked trips peaked in 2019 at 196,978
• Trips declined to 129,160 in 2021 (post pandemic)
• Trips increased by 4.45% to 134,916 in 2022 according to the Federal Transit Administration
(FTA) National Transit Database (NTD) data
The transit service in the region is fragmented by service area and type (commuter/worker,
worker/tourist) and serves different markets with l imited coordination. According to the LRTA, they
currently have 72,963 yearly unlinked trips or 201 unlinke d trips daily across all the routes that serve
Hilton Head, with 363 service days and one AM and PM t rip respectively. The Breeze Trolley, a seasonal
service had 34,600 unlinked trips (2023) across 143 service d ays or 242 trips per day with 18 daily runs
Sunday to Thursday and 20 runs on Friday and Saturday . The trolley runs April through Labor Day from 1
PM to 10 PM daily, with extended service to 11 PM Frida y and Saturday.
There is an on-demand van service countywide with t rips to Hilton Head. However, the ridership is
unknown, and a 24 hour prior reservation is needed to make a trip. The is also a Beach Parking shuttle
which operates 47 days per year from 10 AM to 4:30 PM on Friday, Saturday, Sunday and holidays from
Memorial Day to Labor Day, with 3,980 riders (2023).
The fixed route Breeze transit option, as currently structured, only largely addresses the employment side
to/from the island, and the trolley partially addre sses trips of visitors, residents and likely some workers
once they are on the island. The Breeze service doe s provide long distance routes. The on-island troll ey is
seasonal and has limited service hours. Overall, th ere is little coordination between the transit serv ice
types (commuter bus and trolley/shuttle), and there is service gap from Labor Day to April when the
trolley does not currently run.
Based upon Lochmueller’s evaluations, it appears tr ansit across all services currently only provides a
fraction of the total regional trip making to and f rom, and on, the island. In the future, transit would need
to be more robust in terms of service span (number of trips daily and days per year of service) and
coordinated to be most effective, with some sort of travel time advantage and way to address the last
mile distribution once passengers are on the island .
As described in the preceding sections of this memo randum, the 2023 existing traffic volumes would need
to be reduced by approximately 30% and the 2045 traffic volumes would need to be reduced by
approximately 40% for the current 4-lane configuratio n to operate acceptably. By comparison, in 2021,
the transit mode share was less than 1% in the regi on
1 , and would therefore have to grow exponentially
to be effective enough to reduce the need for six l anes along US 278 in the area under study.
1 https://datausa.io/profile/geo/hilton-head-island- bluffton-towns-beaufort-city-puma-sc#housing
Page 53 of 157
May 3, 2024
Page 4
Therefore, it is Lochmueller’s opinion that even if significant modifications were made to the existin g
Palmetto Breeze transit system, it would be highly unlikely these modifications alone could account fo r
enough trips and the mode share percentage needed t o sufficiently reduce the number of trips across th e
US 278 bridges, such that a four-lane facility could b e maintained.
Ferry System/Facility Usage Fee
In addition to expanding the existing mass transit system, Lochmueller evaluated whether the
implementation of a new ferry system or the impleme ntation of a facility usage fee, also commonly
known as congestion pricing, would provide enough b enefit to maintain the existing four-lane section
across the US 278 bridges and/or between Windmill Har bour and Squire Pope Road.
In regard to the implementation of a new ferry system, it is our understanding that during the
development of the 2045 Lowcountry Area Transportation Study (LATS) Long Range Transportation Plan
(LRTP), long-term transit considerations were discu ssed with the public and stakeholders. One of these
considerations included implementing high-speed fer ry services between Hilton Head Island and Beaufort
or Port Royal to the north, and Savannah or Tybee I sland to the south.
It should be noted, however, that no formal studies have been initiated by the LATS Policy Committee o r
other governing bodies to determine the feasibility of implementing and/or maintaining a high-speed
ferry system to/from Hilton Head Island. Therefore, it is reasonable to assume that a high speed ferry
system to/from Hilton Head Island would not be full y operational within the next ten to fifteen years.
If/when a new ferry system is implemented, it is highly unlikely the resulting reduction in traffic wo uld
allow for a four-lane section to be maintained alon g US 278 across the bridges and/or between Windmill
Harbour and Squire Pope Road (e.g., 30% reduction in 2023 traffic or 40% reduction in traffic by 2045),
given that the existing Palmetto Breeze transit system accounts for less than 1% of the region’s transi t
mode share today.
In regard to the implementation of a facility usage fee, it is our understanding that laws within the State
of South Carolina only allow tolls/fees to be imple mented on new roads within the State system. As suc h,
implementing facility usage fees on any of the existing roadways that are within the William Hilton
Parkway Gateway Corridor Study area would be prohib ited. It should be noted that, even if a facility usage
fee could be implemented, the fee would largely imp act commuters, not tourists, who enter and exit the
island for work, as the majority of traffic during the AM and PM peak hours is a result of commuter tr affic.
Therefore, even if a facility usage fee could be implemented, it is highly unlikely the resulting redu ction in
traffic would allow for a four-lane section to be maintained along US 278 across the bridges and/or
between Windmill Harbour and Squire Pope Road (e.g. , e.g., 30% reduction in 2023 traffic or 40%
reduction in traffic by 2045).
Page 54 of 157
May 3, 2024
Page 5
Conclusions
Lochmueller evaluated the viability of maintaining four lanes along William Hilton Parkway (US 278)
between Windmill Harbour and Squire Pope Road; the implementation of a second bridge; modifications
to the existing mass transit system; implementation of a new ferry system; and the implementation of a
facility usage fee. These evaluations were completed by Lochmueller to determine feasibility of
maintaining a four lane section along William Hilto n Parkway between Moss Creek Drive and Squire Pope
Road, if one or more of these strategies were imple mented.
As noted in this technical memorandum, the existing traffic volumes already create significant congest ion
along US 278, and the congestion is expected to be ex acerbated by 2045 with the forecasted background
growth. Based on a preliminary analysis, the existi ng traffic volumes would need to be reduced by
approximately 30%, and the 2045 traffic volumes would ne ed to be reduced by approximately 40%, in
order for a four-lane section to operate acceptably .
Based on Lochmueller’s evaluations, it was conclude d that it would be highly unlikely that modificatio ns
to the existing transit system alone could account for enough trips and the mode share percentage
needed to sufficiently reduce the number of trips a cross the US 278 bridges, such that a four-lane facil ity
could be maintained, given that the current transit mode share within the region is less than 1%, and
would therefore have to increase exponentially to r each the target goal. In addition, neither the
implementation of a new ferry system, nor the imple mentation of a facility usage fee (if there were a legal
way to implement said fee), would be able to signif icantly reduce the number of vehicles along US 278
within the study area to allow for a four-lane section to be maintained.
In order for the existing four-lane section to operate acceptably, the total reduction in vehicles fro m mass
transit, a new ferry system, and the implementation of a facility usage fee would need to be between 30 -
40%. While implementing the aforementioned types of t ransportation strategies would help slow future
traffic growth on US 278, it is Lochmueller’s opinion that even if all of these strategies are implement ed,
the reduction in vehicles would not reach 30%. Furth ermore, these strategies would not address the
structural issues associated with the existing brid ges over Mackay Creek and Skull Creek. Consequently , it
is Lochmueller’s opinion that these strategies shou ld not be considered as viable alternatives to be u sed
individually and/or collectively to solely address traffic congestion and mobility related concerns al ong US
278 within the project study area, that could allow a four-lane section to be maintained along US 278
within the study area.
In regard to implementing a second bridge and/or po int of access onto Hilton Head Island from the
mainland, while it is acknowledged there are clear benefits to providing a second bridge (e.g., redund ancy
during natural disasters), Lochmueller’s evaluation s show that operating conditions along US 278 are
already congested today. Given the congestion that is already experienced along this corridor today, t he
amount of traffic that would need to be removed fro m the existing traffic stream to be able to maintai n
four lanes across the bridge (i.e., 30% reduction in 2023 traffic or 40% reduction in traffic by 2045), and
the time it would take to construct a second bridge , it is our opinion that a six-lane section of US 278 onto
Hilton Head Island is needed independently of a sec ond bridge.
Page 55 of 157
MEMO
Huntington Tower, 201 W Springfield Avenue, Suite 1012
Champaign, Illinois 61820
PHONE: 217.673.7633
To: Town of Hilton Head, South Carolina
From: Lochmueller Group
Date: May 3, 2024
Subject: Independent Study of the William Hilton Parkway Gateway Corridor
Corridor Alternatives Analysis Memorandum – Task 3.6
Lochmueller Group (Lochmueller) has prepared the following memorandum pertaining to the
Independent Study of the William Hilton Pkwy Gateway Corridor. This memorandum summarizes the
findings related to the 2023 existing conditions and 2045 no build conditions for the entire project area
which includes US 278 from Moss Creek Drive to Indigo Run Drive, as well as US 278 (Palmetto Bay Road)
from Cross Island Pkwy to Sea Pines Circle. Figure 1 shows the entire project area which was used for the
2023 existing conditions and 2045 no build analysis. This memorandum also provides a summary of the
four alternatives considered for the 2045 build conditions for the modified original project area which
extends along US 278 from Moss Creek Dr to Gumtree Road. Figure 2 shows the modified original project
area which was used for the 2045 alternatives analysis. The intention of this memorandum is to provide
the Town of Hilton Head with the findings of the 2023 existing, 2045 no build, and 2045 alternatives
analysis.
Page 56 of 157
May 3, 2024
Page 2
FIGURE 1. ENTIRE PROJECT STUDY AREA
FIGURE 2. MODIFIED ORIGINAL PROJECT STUDY AREA
Moss Creek Dr
Indigo Run Dr
Gumtree Rd
Sea Pines Circle
Moss Creek Dr
Gumtree Rd
Page 57 of 157
May 3, 2024
Page 3
2023 Existing Conditions
The 2023 existing conditions analysis is intended to reflect current conditions. This scenario provides a
baseline to ensure accurate calibration of the models as well as serve as a comparison to the future 2045
no build and 2045 alternatives analyses.
2023 Existing Traffic Volumes
Traffic volumes were collected by others at the following intersections on March 22, 2023:
• Buckingham Plantation Dr and Bluffton
Pkwy
• Buckingham Plantation Dr and US 278
• Moss Creek Dr and US 278
• WB Bluffton Pkwy Ramp and WB US 278
• EB Bluffton Pkwy Ramp and EB US 278
• Fording Island Rd Extension and US 278
• Pinckney Wildlife Refuge and US 278
• Blue Heron Point Rd and US 278
• Crosstree Dr and US 278
• Jenkins Rd and US 278
• Squire Pope Rd and US 278
• Spanish Wells Rd and US 278
• Cross Island Pkwy Diverge and EB US 278
• Cross Island Pkwy Merge and WB US 278
• Gumtree Rd and Cross Island Pkwy Off and
On Ramps
• Gumtree Rd and Business US 278
• Jarvis Park Rd and Business US 278
• Pembroke Dr and Business US 278
• Indigo Run Dr and Business US 278
• Marshland Rd and Spanish Wells Rd
• Marshland Rd and SB Cross Island Pkwy
Ramps
• Marshland Rd and NB Cross Island Pkwy
Ramps
• Arrow Rd and US 278
• Target Rd and US 278
• Sea Pines Circle and US 278
This study evaluates conditions during the morning and evening peak periods of a typical weekday, as
these periods represent the most critical times of day for traffic operations within the study area for
commuter peaks. If traffic can be accommodated during these peak periods, it stands to reason that
adequate capacity would be available throughout the remainder of the day.
Corridor studies often reference the 30th highest day for traffic volumes to ensure that the volumes used
in the analysis reflect peak conditions, while not over- or under-estimating the traffic volumes. Therefore,
it was necessary to ensure that the counts collected accurately reflect the 30 th highest day. Historical
traffic data was obtained from SCDOT from the most recent 365 days. Given that the study focuses on
commuter peak hours, the hourly data from 6:00 AM – 6:00 PM was referenced. After reviewing the
traffic volumes throughout the year, it was determined that March 30, 2023 was the 30th highest day out
of the year for traffic volumes. The counts collected on March 22, 2023 were grown by the percent
difference between the two dates to bring them up to the estimated traffic volumes on March 30, 2023
(30th highest day). The resulting 2023 traffic volumes used in this study are provided in Appendix A.
2023 Existing Traffic Analysis
The 2023 existing traffic analysis was completed using the volumes provided in Appendix A at the study
intersections shown in Figure 1. The 2023 existing traffic analysis includes the adaptive signal
improvements approved by The Town of Hilton Head and implemented by Q-Free in the fall of 2023.
Page 58 of 157
May 3, 2024
Page 4
Synchro Analysis
This preliminary analysis was completed using Synchro 11 traffic modeling software, which is based upon
the methodologies outlined in the “Highway Capacity Manual” (HCM) published by the Transportation
Research Board. Intersection performance or traffic operations are quantified by six Levels of Service
(LOS), which range from LOS A ("Free Flow”) to LOS F ("Fully Saturated"). LOS D is considered acceptable
for peak period conditions in urban and suburban areas. However, at side-street stop-controlled
intersections, a LOS E or even a LOS F is a common occurrence for peak period conditions in urban and
suburban areas as it is typical for delays to be longer for vehicles along the side -street as they wait to find
acceptable gaps in the traffic to turn left into the traffic stream.
Levels of service for intersections are determined based on the average d elay experienced by motorists.
Signalized intersections reflect higher delay tolerances as compared to unsignalized and roundabout
locations because motorists are accustomed to and accepting of longer delays at signals. For signalized
and all-way stop intersections, the average control delay per vehicle is estimated for each movement and
then aggregated for each approach and the intersection as a whole. For intersections with partial ( side-
street) stop control, the delay is calculated for the minor movements only (side -street approaches and
major road left-turns) since thru traffic on the major road is not required to stop.
Table 1 summarizes the criterion for both signalized and unsignalized inte rsections, as defined by the
Highway Capacity Manual (HCM) 6th Edition, last updated in 2016 by the Transportation Research Board.
TABLE 1: INTERSECTION LEVEL OF SERVICE THRESHOLDS
Level of Service
Control Delay per Vehicle (sec/veh)
Signalized Unsignalized/Roundabout
A < 10 0-10
B > 10-20 > 10-15
C > 20-35 > 15-25
D > 35-55 > 25-35
E > 55-80 > 35-50
F > 80 > 50
Operating conditions at the study intersections were evaluated using Synchro 11 and are summarized in
Table 2. The measures of effectiveness reported include LOS, delay, queue, and volume -to-capacity ratio
(v/c). The delay is reported in seconds per vehicle. The queue is reported in feet as the 95th percentile
queue. The v/c ratio compares vehicle demand to the capacity of an associated lane group. A v/c ratio of
1.0 represents a road segment that is at full capacity.
As shown, eastbound traffic experiences significant congestion during the AM peak period , whereas
westbound traffic experiences significant congestion during the PM peak period. This is consistent with
the commuter traffic patterns in the Town of Hilton Head.
While several intersections experience long delays and queue lengths during the AM peak hour, the PM
peak hour appears to have overall worse operating conditions . Long delays occur along side-streets at
Page 59 of 157
May 3, 2024
Page 5
unsignalized intersections throughout the entire study area. Additionally, a rolling queue begins at
Wilborn Rd and continues in the westbound lanes of US 278 over the bridge during the PM peak hour. The
westbound queue length reaches up to approximately 2,500 ft (101 cars) at Squire Pope during the PM
peak hour. It is evident that the study area currently experiences congestion during both the AM and PM
peak periods.
TABLE 2. 2023 EXISTING OPERATING CONDITIONS (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (10.4) B (15.3)
Eastbound Approach A (7.1) [196] <0.37> A (9.1) [166] <0.29>
Westbound Approach B (12.4) [146] <0.21> B (17.5) [346] <0.46>
Northbound Approach D (41.9) [63] <0.14> C (34.2) [48] <0.15>
Southbound Approach B (18.4) [55] <0.25> C (24.3) [m81] <0.30>
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection B (19.2) C (29.6)
Eastbound Approach B (15.0) [413] <0.56> B (19.5) [391] <0.64>
Westbound Approach B (14.6) [291] <0.36> C (26.8) [710] <0.71>
Northbound Approach D (45.5) [126] <0.67> E (75.9) [103] <0.56>
Southbound Approach E (59.4) [107] <0.57> F (81.3) [#174] <0.91>
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (signal)
Eastbound Left Turn C (16.5) [<25] <0.03> E (43.4) [<25] <0.22>
Westbound Left Turn D (33.5) [<25] <0.05> D (26.6) [<25] <0.15>
Northbound Approach D (26.5) [<25] <0.23> C (21.7) [<25] <0.23>
Southbound Approach D (30.8) [45] <0.41> F (165.4) [150] <0.99>
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn C (18.0) [<25] <0.02> B (14.8) [<25] <0.04>
Northbound Approach F (242.4) [75] <0.81> F ($744.7) [168] <1.97>
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (15.4) [<25] <0.01> E (45.1) [<25] <0.05>
Westbound Left Turn No volumes observed C (22.7) [<25] <0.01>
Northbound Approach E (38.1) [<25] <0.02> F ($2538.4) [68] <2.99>
Southbound Approach No volumes observed F (50.4) [<25] <0.17>
Page 60 of 157
May 3, 2024
Page 6
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed C (23.8) [<25] <0.01>
Northbound Approach F ($794.0) [58] <1.19> F ($2033.9) [118] <3.51>
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection B (15.5) E (59.1)
Eastbound Approach C (21.2) [#1701] <0.97> B (10.3) [697] <0.82>
Westbound Approach A (5.2) [291] <0.62> F (93.2) [#2084] <1.16>
Northbound Approach D (38.0) [65] <0.42> E (68.0) [105] <0.72>
Southbound Approach 0 (0.0) [<25] <0.01> 0 (0.0) [<25] <0.00>
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (15.6) [<25] <0.02> F (56.9) [<25] <0.13>
Southbound Approach F ($469.6) [45] <0.73> F ($7285.9) [158] <12.12>
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (15.4) [<25] <0.01> E (45.1) [<25] <0.05>
Westbound Left Turn No volumes observed C (22.7) [<25] <0.01>
Northbound Approach E (38.1) [<25] <0.02> F ($2538.4) [68] <2.99>
Southbound Approach No volumes observed F (50.4) [<25] <0.17>
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed C (23.8) [<25] <0.01>
Northbound Approach F ($794.0) [58] <1.19> F ($2033.9) [118] <3.51>
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection B (15.5) E (59.1)
Eastbound Approach C (21.2) [#1701] <0.97> B (10.3) [697] <0.82>
Westbound Approach A (5.2) [291] <0.62> F (93.2) [#2084] <1.16>
Northbound Approach D (38.0) [65] <0.42> E (68.0) [105] <0.72>
Southbound Approach 0 (0.0) [<25] <0.01> 0 (0.0) [<25] <0.00>
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (15.6) [<25] <0.02> F (56.9) [<25] <0.13>
Southbound Approach F ($469.6) [45] <0.73> F ($7285.9) [158] <12.12>
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection B (12.5) F (101.4)
Eastbound Approach A (6.3) [530] <0.66> B (14.4) [#387] <0.93>
Westbound Approach A (9.4) [264] <0.55> F (140.5) [~2514] <1.26>
Northbound Approach C (24.0) [<25] <0.03> E (79.9) [70] <0.22>
Page 61 of 157
May 3, 2024
Page 7
Southbound Approach F (97.3) [#319] <1.01> F (296.1) [#709] <1.61>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach C (21.5) [28] <0.28> F (53.5) [<25] <0.13>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (30.1) D (36.0)
Eastbound Approach C (26.2) [1224] <0.85> B (16.7) [383] <0.62>
Westbound Approach B (18.2) [274] <0.66> C (25.2) [862] <0.80>
Northbound Approach E (61.8) [223] <0.62> F (214.3) [#667] <1.46>
Southbound Approach F (117.7) [#284] <1.00> E (65.7) [187] <0.36>
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection E (59.1) E (66.1)
Eastbound Approach E (64.3) [#1177] <0.98> E (65.7) [763] <0.90>
Westbound Approach C (33.6) [#412] <0.93> D (54.5) [648] <1.00>
Northbound Approach E (72.0) [#312] <0.89> E (61.5) [351] <0.86>
Southbound Approach F (90.7) [#418] <0.90> F (115.5) [#517] <1.07>
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (22.1) C (30.8)
Eastbound Approach B (16.6) [m516] <0.74> C (20.5) [m596] <0.73>
Westbound Approach B (11.3) [316] <0.50> C (25.6) [#1420] <0.98>
Northbound Approach F (99.7) [143] <0.61> F (108.7) [146] <0.76>
Southbound Approach E (65.5) [262] <0.77> E (67.9) [223] <0.96>
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection B (19.7) C (29.6)
Eastbound Approach B (11.2) [560] <0.73> B (18.0) [546] <0.60>
Westbound Approach A (9.0) [155] <0.44> C (22.9) [508] <0.82>
Northbound Approach F (101.1) [#317] <0.86> F (89.3) [324] <0.84>
Southbound Approach D (39.8) [78] <0.39> D (49.2) [95] <0.60>
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn B (10.7) [<25] <0.01> B (14.9) [<25] <0.01>
Westbound Left Turn C (16.0) [<25] <0.02> B (12.3) [<25] <0.01>
Northbound Right Turn C (18.3) [<25] <0.02> B (14.5) [<25] <0.03>
Southbound Right Turn B (12.8) [<25] <0.05> C (17.1) [<25] <0.02>
Page 62 of 157
May 3, 2024
Page 8
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn C (17.6) [<25] <0.04> C (16.1) [<25] <0.17>
Southbound Right Turn B (12.7) [<25] <0.02> C (17.5) [<25] <0.04>
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection C (31.1) D (42.1)
Eastbound Approach C (27.3) [693] <0.65> C (30.8) [634] <0.71>
Westbound Approach B (16.2) [343] <0.41> C (31.3) [891] <0.75>
Northbound Approach E (70.1) [112] <0.48> E (68.9) [205] <0.68>
Southbound Approach E (70.3) [#188] <0.78> F (96.0) [#247] <0.98>
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un -signalized)
Eastbound Approach B (11.0) [<25] <0.00> B (12.8) [<25] <0.15>
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (8.9) [<25] <0.12> A (8.4) [<25] <0.14>
Southbound Left Turn C (17.2) [<25] <0.08> D (33.6) [35] <0.35>
Southbound Right Turn A (9.2) [<25] <0.04> B (12.9) [<25] <0.16>
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (8.2) [<25] <0.11> A (8.4) [<25] <0.05>
Northbound Left Turn B (14.5) [<25] <0.17> C (23.0) [100] <0.61>
Northbound Right Turn A (9.2) [<25] <0.07> B (10.2) [<25] <0.20>
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn - F (209.4) [30] <0.40>
Eastbound Right Turn C (18.7) [<25] <0.02> B (14.9) [<25] <0.03>
Northbound Left Turn C (16.4) [<25] <0.02> B (13.0) [<25] <0.05>
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (13.8) C (21.1)
Eastbound Approach D (43.3) [175] <0.70> C (30.2) [101] <0.38>
Westbound Approach C (28.0) [74] <0.44> D (46.9) [249] <0.88>
Northbound Approach A (5.4) [75] <0.30> B (17.8) [756] <0.66>
Southbound Approach B (11.5) [535] <0.61> B (15.4) [432] <0.65>
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach D (33.1) [<25] <0.08> F (84.2) [<25] <0.19>
Southbound Left Turn A (9.6) [<25] <0.02> B (14.6) [<25] <0.01>
Page 63 of 157
May 3, 2024
Page 9
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach D (33.8) [<25] <0.08> F (61.2) [<25] <0.20>
Southbound Left Turn A (9.6) [<25] <0.03> B (14.6) [<25] <0.01>
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn C (23.7) [<25] <0.03> E (41.3) [<25] <0.10>
Westbound Right Turn B (11.1) [<25] <0.01> C (16.7) [<25] <0.03>
Southbound Left Turn A (9.8) [<25] <0.05> B (14.6) [<25] <0.03>
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn C (24.7) [<25] <0.06> E (41.3) [<25] <0.10>
Westbound Right Turn B (11.2) [<25] <0.01> C (16.7) [<25] <0.03>
Southbound Left Turn A (9.9) [<25] <0.07> B (14.6) [<25] <0.03>
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection B (10.6) B (18.6)
Eastbound Approach D (39.4) [82] <0.32> E (59.5) [247] <0.80>
Westbound Approach E (56.6) [154] <0.68> C (33.7) [119] <0.49>
Northbound Approach A (8.7) [199] <0.31> B (15.3) [530] <0.59>
Southbound Approach A (3.9) [102] <0.58> A (8.7) [155] <0.53>
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn D (26.5) [<25] <0.03> E (40.3) [<25] <0.24>
Westbound Right Turn B (11.4) [<25] <0.02> C (17.1) [<25] <0.18>
Southbound Left Turn B (10.6) [<25] <0.16> B (13.0) [<25] <0.02>
29: Palmetto Bay Rd & William Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection D (25.8) C (24.4)
Eastbound Approach D (34.2) [200] <0.81> E (45.6) [300] <0.92>
Westbound Approach C (16.4) [125] <0.64> E (36.6) [75] <0.85>
Northbound Approach B (12.1) [75] <0.54> D (32.4) [275] <0.88>
Southbound Approach F (59.4) [500] <1.03> E (39.2) [375] <0.94>
# – 95th Percentile volume exceeds capacity
$ – Delay more than 300 seconds
m – Upstream metering is in effect
VISSIM Analysis
In addition to Synchro, the traffic analysis was also completed using VISSIM, which is a microsimulation
tool that accurately replicates individual vehicles and their interactions within complex traffic streams,
such as interchanges, freeways, and expressway corridors with signalized intersections. A robust amount
of data and field observations were conducted to calibrate VISSIM to reproduce field conditions .
Page 64 of 157
May 3, 2024
Page 10
Field observations were conducted over the course of two weekdays in December 2023 and included both
the AM and PM peak periods. Travel time runs and average speeds were conducted during the AM and
PM peak periods along William Hilton Pkwy between Moss Creek and Indigo Run, as well as from William
Hilton Pkwy at Moss Creek Dr to Cross Island Pkwy at Sea Pines Circle, to aid in the calibration of the
VISSIM model.
As part of the calibration criteria, it was determined that the travel times reported in the VISSIM model
should be within 10% of the travel times recorded in the field. The travel times calculated in the VISSIM
model were inflated by 15% to account for higher volumes in March versus in December when the travel
times were collected. The travel time results are provided in Table 3. As shown all of the travel times were
within 10%, therefore all travel time targets were satisfied.
TABLE 3. 2023 EXISTING VISSIM CALIBRATION TRAVEL TIME RESULTS
Corridor
Observed travel
time (secs)
Simulated travel
time (secs) % Difference
AM PM AM PM AM PM
William Hilton Pkwy between Moss
Creek and Indigo Run
EB 1108 672 1157 619 4.42% -7.91%
WB 605 1202 572 1252 -5.50% 4.17%
William Hilton Pkwy @Moss Creek
to Cross Island Pkwy @Sea Pine
SB 1378 821 1356 857 -1.58% 4.37%
NB 800 1516 826 1520 3.20% 0.25%
In addition to travel time calculations, traffic volumes were also used to help calibrate the VISSIM model.
Similar to the travel times, it was determined that the traffic volumes reported in the VISSIM model
should be within 10% of the 2023 existing traffic volumes provided in Appendix A. The traffic volume
results are provided in Table 4. As shown all of the traffic volumes were within 10%, therefore all traffic
volume targets were satisfied.
TABLE 4. 2023 EXISTING VISSIM CALIBRATION TRAFFIC VOLUMES RESULTS
Location
Observed
traffic volumes
(vehicles)
Simulated
traffic volumes
(vehicles)
% Difference
AM PM AM PM AM PM
William Hilton Pkwy west of Squire Pope EB 2774 2237 2970 2240 7.07% 0.13%
William Hilton Pkwy west of Squire Pope WB 1639 3030 1650 2898 0.67% -4.36%
William Hilton Pkwy east of Spanish Wells EB 2729 1991 2929 1955 7.33% -1.81%
William Hilton Pkwy east of Spanish Wells WB 1408 2623 1423 2614 1.07% -0.34%
Cross Island Pkwy north of Marshland Rd NB 975 1422 964 1371 -1.13% -3.59%
Cross Island Pkwy north of Marshland Rd SB 1416 1190 1486 1167 4.94% -1.93%
Page 65 of 157
May 3, 2024
Page 11
The VISSIM traffic models evaluate conditions during the morning and afternoon peak hours and provide
performance measures as outputs. The LOS criteria for signalized and unsignalized intersections are the
same as Table 1. The measures of effectiveness (MOE) reported include levels of service, delay, average
queue length, and maximum queue length. The delay is reported in seconds per vehicle and the queue is
reported in feet.
The 2023 existing operating conditions based on the VISSIM model are summarized in Table 5. As shown,
the traffic operations largely agree with those shown in Table 2 from the Synchro analysis. The PM peak
hour appears to have overall worse operating conditions. The long delays presented in the Synchro
analysis along side-streets at unsignalized intersections throughout the entire study area were confirmed
in this VISSIM analysis. Therefore, it can be concluded that the study area currently experiences significant
congestion during both the AM and PM peak periods.
TABLE 5. 2023 EXISTING TRAFFIC OPERATIONS (VISSIM)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (12.2) B (11.4)
Eastbound Approach B (12.5) [43] {324} B (11.7) [<25] {178}
Westbound Approach A (8.3) [<25] {171} A (9.3) [<25] {234}
Northbound Approach D (38.1) [<25] {73} C (32.2) [<25] {65}
Southbound Approach A (9.0) [<25] {68} B (12.6) [<25] {84}
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection D (47.2) B (19.5)
Eastbound Approach E (70.7) [807] {1620} B (15.6) [65] {522}
Westbound Approach B (14.4) [35] {353} B (19.1) [100] {633}
Northbound Approach D (35.9) [37] {263} D (53.6) [<25] {104}
Southbound Approach D (42.4) [<25] {92} C (33.6) [29] {161}
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (un-signalized)
Eastbound Left Turn E (35.3) [720] {1302} C (19.7) [<25] {47}
Westbound Left Turn F (414.9) [37] {107} B (11.2) [<25] {41}
Northbound Approach B (10.1) [<25] {61} A (7.3) [<25] {55}
Southbound Approach C (19.7) [<25] {76} A (8.0) [<25] {73}
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn E (40.7) [46] {102} C (16.8) [<25] {28}
Northbound Approach F (591.0) [120] {186} C (17.5) [<25] {41}
Page 66 of 157
May 3, 2024
Page 12
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (21.4) [691] {1658} D (33.1) [<25] {<25}
Westbound Left Turn No volumes observed C (20.9) [<25] {<25}
Northbound Approach F (270.5) [<25] {38} C (20.8) [<25] {46}
Southbound Approach No volumes observed C (18.2) [<25] {39}
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed D (27.7) [<25] {<25}
Northbound Approach F (1,270.4) [123] {228} C (23.8) [<25] {60}
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection B (10.4) A (8.2)
Eastbound Approach A (8.4) [335] {1093} A (5.4) [62] {890}
Westbound Approach B (10.7) [53] {655} A (7.5) [292] {1626}
Northbound Approach E (67.8) [30] {164} E (79.0) [52] {214}
Southbound Approach B (17.3) [<25] {<25} A (0.0) [<25] {<25}
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn A (8.2) [<25] {<25} F (98.0) [<25] {54}
Southbound Approach F (51.8) [<25] {44} F (109.4) [<25] {92}
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection D (39.2) E (67.3)
Eastbound Approach E (56.8) [451] {1334} B (19.3) [283] {1132}
Westbound Approach A (7.0) [39] {618} F (104.8) [874] {1383}
Northbound Approach C (31.9) [<25] {38} E (78.6) [<25] {76}
Southbound Approach C (21.7) [<25] {147} F (91.6) [220] {638}
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach A (1.3) [<25] {<25} A (6.4) [<25] {25}
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (29.8) F (240.4)
Eastbound Approach C (26.6) [270] {1027} B (17.1) [103] {622}
Westbound Approach C (21.9) [87] {471} F (415.7) [892] {989}
Northbound Approach E (57.1) [85] {321} F (395.1) [1241] {1288}
Southbound Approach F (89.0) [103] {319} E (63.9) [58] {242}
Page 67 of 157
May 3, 2024
Page 13
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (40.7) E (66.4)
Eastbound Approach D (40.6) [765] {1592} D (49.9) [203] {779}
Westbound Approach C (30.3) [136] {357} E (75.2) [961] {1610}
Northbound Approach C (29.0) [75] {291} D (45.2) [175] {338}
Southbound Approach E (77.2) [182] {579} F (93.4) [234] {779}
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection D (39.2) E (67.3)
Eastbound Approach E (56.8) [451] {1334} B (19.3) [283] {1132}
Westbound Approach A (7.0) [39] {618} F (104.8) [874] {1383}
Northbound Approach C (31.9) [<25] {38} E (78.6) [<25] {76}
Southbound Approach C (21.7) [<25] {147} F (91.6) [220] {638}
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach A (1.3) [<25] {<25} A (6.4) [<25] {25}
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (29.8) F (240.4)
Eastbound Approach C (26.6) [270] {1027} B (17.1) [103] {622}
Westbound Approach C (21.9) [87] {471} F (415.7) [892] {989}
Northbound Approach E (57.1) [85] {321} F (395.1) [1241] {1288}
Southbound Approach F (89.0) [103] {319} E (63.9) [58] {242}
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (40.7) E (66.4)
Eastbound Approach D (40.6) [765] {1592} D (49.9) [203] {779}
Westbound Approach C (30.3) [136] {357} E (75.2) [961] {1610}
Northbound Approach C (29.0) [75] {291} D (45.2) [175] {338}
Southbound Approach E (77.2) [182] {579} F (93.4) [234] {779}
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (21.8) C (25.8)
Eastbound Approach B (17.1) [178] {929} B (13.8) [67] {754}
Westbound Approach B (17.9) [73] {543} C (34.2) [668] {1285}
Northbound Approach F (81.1) [45] {168} E (77.4) [43] {186}
Southbound Approach D (45.4) [72] {233} C (21.7) [28] {120}
Page 68 of 157
May 3, 2024
Page 14
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection B (18.7) C (33.7)
Eastbound Approach B (12.6) [134] {991} B (14.3) [76] {754}
Westbound Approach B (12.7) [39] {443} D (42.4) [645] {1261}
Northbound Approach E (72.0) [84] {274} E (69.4) [93] {310}
Southbound Approach D (37.3) [<25] {91} D (42.2) [<25] {115}
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn A (8.5) [<25] {<25} F (55.9) [<25] {50}
Westbound Left Turn C (16.5) [<25] {<25} A (9.7) [<25] {<25}
Northbound Right Turn C (21.6) [<25] {27} B (12.4) [<25] {32}
Southbound Right Turn B (11.3) [<25] {41} F (165.1) [<25] {65}
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn B (11.5) [<25] {25} A (7.7) [<25] {61}
Southbound Right Turn B (10.6) [<25] {46} F (93.1) [<25] {72}
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection C (23.3) D (44.1)
Eastbound Approach B (18.9) [115] {848} C (30.6) [116] {772}
Westbound Approach B (15.3) [40] {333} D (44.8) [592] {1536}
Northbound Approach D (54.0) [29] {103} E (58.6) [46] {190}
Southbound Approach D (49.7) [52] {187} E (73.4) [83] {324}
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un -signalized)
Eastbound Approach A (9.1) [<25] {45} B (10.9) [<25] {61}
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (3.7) [<25] {63} A (2.1) [<25] {60}
Southbound Left Turn A (8.8) [<25] {47} B (10.6) [<25] {77}
Southbound Right Turn A (6.1) [<25] {80} A (7.9) [<25] {110}
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (1.3) [<25] {36} A (1.4) [<25] {<25}
Northbound Left Turn B (10.8) [<25] {69} C (21.3) [31] {193}
Northbound Right Turn A (6.0) [<25] {94} A (7.0) [46] {218}
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed E (40.7) [<25] {33}
Eastbound Right Turn B (14.3) [<25] {25} B (12.5) [<25] {31}
Northbound Left Turn A (9.0) [<25] {<25} A (7.1) [<25] {34}
Page 69 of 157
May 3, 2024
Page 15
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (13.2) B (16.9)
Eastbound Approach C (33.3) [52] {191} C (32.0) [37] {175}
Westbound Approach B (18.8) [<25] {106} C (23.2) [56] {261}
Northbound Approach B (10.5) [29] {261} B (15.7) [92] {612}
Southbound Approach B (10.9) [94] {873} B (14.2) [67] {606}
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach C (17.1) [<25] {50} C (18.1) [<25] {52}
Southbound Left Turn A (3.2) [<25] {<25} B (13.2) [<25] {<25}
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach C (18.0) [<25] {53} C (17.4) [<25] {53}
Southbound Left Turn A (4.0) [<25] {37} A (7.5) [<25] {<25}
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn D (27.5) [<25] {<25} D (30.0) [<25] {35}
Westbound Right Turn A (8.4) [<25] {58} B (13.1) [<25] {68}
Southbound Left Turn A (3.6) [<25] {40} B (11.0) [<25] {26}
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn D (30.6) [<25] {27} D (32.8) [<25] {39}
Westbound Right Turn A (8.8) [<25] {63} B (11.4) [<25] {75}
Southbound Left Turn A (4.3) [<25] {98} B (11.9) [<25] {<25}
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection B (16.0) B (17.6)
Eastbound Approach C (33.3) [<25] {110} D (41.8) [62] {248}
Westbound Approach D (37.1) [35] {151} C (29.4) [38] {149}
Northbound Approach A (9.7) [28] {214} B (13.3) [71] {508}
Southbound Approach B (15.4) [287] {1309} B (13.9) [99] {742}
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn F (184.7) [<25] {50} F (65.5) [<25] {75}
Westbound Right Turn A (9.1) [<25] {84} B (13.1) [<25] {110}
Southbound Left Turn B (10.4) [112] {512} B (12.5) [<25] {383}
Page 70 of 157
May 3, 2024
Page 16
29: Palmetto Bay Rd & William Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection E (37.0) F (51.8)
Eastbound Approach F (208.4) [615] {814} F (51.0) [285] {770}
Westbound Approach A (7.5) [<25] {263} F (168.3) [1635] {1658}
Northbound Approach A (4.2) [<25] {223} D (30.8) [228] {738}
Southbound Approach B (12.9) [194] {461} A (8.4) [85] {460}
2045 No Build Conditions
The 2045 no build conditions analysis is intended to reflect future conditions within the study area while
accounting for an increase in “background” traffic. No modifications were made to the lane
configurations. However, the 2045 no build scenario does include the effects of the adaptive signal
system implemented in the fall of 2023.
2045 No Build Traffic Volumes
In order to evaluate traffic conditions through the year 2045, it was necessary to forecast the anticipated
growth within the study area based on an increase in “background” traffic resulting from increasing
population and commercial and employment growth in The Town of Hilton Head.
An annual background growth rate of 0.56% was determined after careful consideration of the
Lowcountry Area Transportation Study (LATS) Travel Demand Model (TDM), census data, Beaufort County
historic growth trends, historic traffic growth on the US 278 bridge, sale and restaurant tax revenue,
public parking revenue, and short term rental data. A memorandum detailing the methodology behind
the 0.56% growth rate is provided an Appendix B. The 2023 existing traffic volumes (Appendix A) were
grown annually by 0.56% to 2045 in order to produce the 2045 no build traffic volumes which are
provided in Appendix C.
2045 No Build Traffic Analysis
Similar to the 2023 existing conditions, the 2045 no build traffic analysis was completed using both
Synchro and VISSIM. The 2045 no build operating conditions were evaluated using the same methodology
applied to the 2023 existing conditions.
Synchro Analysis
The 2045 no build operating conditions at the study intersections were evaluated using Synchro 11 and
are summarized in Table 6. As shown, the previously failing conditions and congestion experienced in the
2023 existing conditions are expected to be exacerbated by 2045 with the forecasted growth. Significant
congestion is expected throughout the study area. Therefore, it can be concluded tha t the study
intersections cannot accommodate the forecasted traffic growth in their existing state.
Page 71 of 157
May 3, 2024
Page 17
TABLE 6. 2045 NO BUILD OPERATING CONDITIONS (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (17.6) C (25.5)
Eastbound Approach B (15.1) [298] <0.54> B (16.0) [207] <0.50>
Westbound Approach C (25.4) [202] <0.38> D (36.7) [#496] <0.86>
Northbound Approach B (15.9) [37] <0.08> B (15.7) [30] <0.11>
Southbound Approach A (9.9) [m23] <0.18> A (6.1) [m21] <0.23>
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection B (18.2) C (26.9)
Eastbound Approach B (16.9) [443] <0.64> B (17.1) [345] <0.75>
Westbound Approach B (17.9) [290] <0.51> C (28.1) [#644] <0.89>
Northbound Approach C (21.2) [98] <0.56> D (49.7) [m#76] <0.74>
Southbound Approach C (31.2) [70] <0.45> E (60.9) [#123] <0.88>
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (18.8) [<25] <0.03> F (65.8) [33] <0.33>
Westbound Left Turn E (44.8) [<25] <0.08> D (34.9) [<25] <0.22>
Northbound Approach D (34.4) [33] <0.31> D (26.7) [30] <0.30>
Southbound Approach F (57.0) [88] <0.63> F (649.6) [273] <2.05>
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn C (21.6) [<25] <0.02> C (17.0) [<25] <0.06>
Northbound Approach F (684.9) [115] <1.63> F ($1880.2) [225] <4.10>
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (17.8) [<25] <0.01> F (67.3) [<25] <0.08>
Westbound Left Turn No volumes observed C (28.7) [<25] <0.01>
Northbound Approach F (50.7) [<25] <0.03> D (32.3) [<25] <0.09>
Southbound Approach No volumes observed F (74.9) [<25] <0.26>
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed D (30.2) [<25] <0.01>
Northbound Approach F ($1763.6) [73] <2.35> F ($5024.3) [145] <8.33>
Page 72 of 157
May 3, 2024
Page 18
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection E (67.8) F (92.1)
Eastbound Approach F (105.5) [#2262] <1.19> C (33.3) [#1547] <1.00>
Westbound Approach A (5.9) [320] <0.64> F (133.8) [~2456] <1.26>
Northbound Approach B (14.6) [34] <0.39> E (77.5) [#106] <0.86>
Southbound Approach 0 (0.0) [<25] <0.01> 0 (0.0) [<25] <0.00>
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (18.3) [<25] <0.03> F (91.5) [<25] <0.22>
Southbound Approach F ($1398.4) [65] <1.86> F (151.3) [73] <.69>
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection C (23.4) F (144.6)
Eastbound Approach B (15.2) [918] <0.81> B (12.6) [370] <0.91>
Westbound Approach C (31.1) [625] <0.74> F (233.2) [m#2394] <1.49>
Northbound Approach B (13.0) [<25] <0.02> E (70.6) [67] <0.29>
Southbound Approach E (69.0) [#286] <0.92> F (231.6) [#577] <1.46>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach D (26.7) [40] <0.36> F (77.9) [<25] <0.20>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection D (37.5) D (45.1)
Eastbound Approach D (38.7) [#1280] <1.02> C (20.5) [381] <0.89>
Westbound Approach C (24.0) [345] <0.91> D (45.2) [m909] <0.99>
Northbound Approach D (51.5) [214] <0.60> F (171.7) [#606] <1.35>
Southbound Approach F (94.1) [#306] <0.97> D (49.3) [168] <0.34>
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection F (84.2) F (80.1)
Eastbound Approach F (94.6) [~1146] <1.16> D (54.0) [#842] <0.99>
Westbound Approach D (43.1) [#391] <0.90> D (44.6) [m539] <0.97>
Northbound Approach F (113.6) [#372] <1.13> F (137.9) [#466] <1.29>
Southbound Approach F (119.0) [#473] <1.09> F (178.8) [#506] <1.33>
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (20.2) E (57.5)
Eastbound Approach B (16.0) [257] <0.90> A (7.6) [m262] <0.76>
Westbound Approach B (12.0) [306] <0.69> D (38.2) [#1335] <1.01>
Northbound Approach F (82.7) [136] <0.58> F (259.8) [#208] <1.33>
Page 73 of 157
May 3, 2024
Page 19
Southbound Approach D (52.5) [249] <0.73> F (250.2) [#358] <1.61>
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection C (27.8) D (38.3)
Eastbound Approach B (15.6) [#1252] <0.91> B (13.7) [351] <0.71>
Westbound Approach D (36.7) [681] <0.55> D (47.7) [1072] <0.89>
Northbound Approach E (73.6) [254] <0.76> F (86.1) [#355] <0.89>
Southbound Approach C (32.7) [74] <0.36> D (49.5) [93] <0.68>
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn B (11.4) [<25] <0.01> B (17.2) [<25] <0.02>
Westbound Left Turn C (18.7) [<25] <0.02> B (13.6) [<25] <0.01>
Northbound Right Turn C (21.0) [<25] <0.03> C (15.9) [<25] <0.04>
Southbound Right Turn B (13.8) [<25] <0.06> C (19.5) [<25] <0.03>
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn C (17.6) [<25] <0.04> C (16.1) [<25] <0.17>
Southbound Right Turn B (12.7) [<25] <0.02> C (17.5) [<25] <0.04>
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection B (18.0) D (36.4)
Eastbound Approach A (3.5) [<25] <0.79> B (16.9) [#297] <0.93>
Westbound Approach B (19.2) [407] <0.51> D (38.4) [#951] <0.92>
Northbound Approach E (62.2) [112] <0.52> E (70.5) [#245] <0.82>
Southbound Approach D (54.9) [178] <0.71> E (67.7) [212] <0.86>
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un -signalized)
Eastbound Approach B (11.5) [<25] <0.00> B (13.8) [<25] <0.19>
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (9.1) [<25] <0.14> A (8.6) [<25] <0.17>
Southbound Left Turn C (19.7) [<25] <0.1> E (49.9) [58] <0.49>
Southbound Right Turn A (9.4) [<25] <0.05> B (14.1) [<25] <0.19>
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (8.3) [<25] <0.12> A (8.6) [<25] <0.06>
Northbound Left Turn C (16.2) [<25] <0.21> D (34.1) [160] <0.75>
Northbound Right Turn A (9.4) [<25] <0.08> B (10.6) [<25] <0.23>
Page 74 of 157
May 3, 2024
Page 20
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed F ($454) [50] <0.74>
Eastbound Right Turn C (21.7) [<25] <0.03> C (16.5) [<25] <0.04>
Northbound Left Turn C (19.4) [<25] <0.03> B (14.5) [<25] <0.06>
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (17.1) C (26.9)
Eastbound Approach D (46.0) [171] <0.71> C (24.5) [102] <0.35>
Westbound Approach C (23.8) [73] <0.44> E (55.3) [#376] <0.94>
Northbound Approach A (9.7) [136] <0.37> C (21.7) [443] <0.86>
Southbound Approach B (15.2) [670] <0.73> C (24.3) [434] <0.88>
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach E (46.3) [<25] <0.13> F (159.5) [30] <0.37>
Southbound Left Turn B (10.0) [<25] <0.02> C (16.8) [<25] <0.02>
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach E (47.3) [<25] <0.13> F (114.3) [33] <0.37>
Southbound Left Turn B (10.1) [<25] <0.04> C (16.7) [<25] <0.02>
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn D (27.7) [<25] <0.04> F (54.8) [<25] <0.14>
Westbound Right Turn B (11.6) [<25] <0.01> C (19.0) [<25] <0.04>
Southbound Left Turn B (10.3) [<25] <0.07> C (16.7) [<25] <0.04>
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn D (29.0) [<25] <0.07> F (54.8) [<25] <0.14>
Westbound Right Turn B (11.7) [<25] <0.01> C (19.0) [<25] <0.04>
Southbound Left Turn B (10.5) [<25] <0.08> C (16.7) [<25] <0.04>
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection B (10.8) B (18.7)
Eastbound Approach C (33.2) [81] <0.31> D (51.4) [241] <0.82>
Westbound Approach D (48.8) [152] <0.69> C (30.4) [115] <0.50>
Northbound Approach B (10.9) [240] <0.37> B (19.0) [585] <0.72>
Southbound Approach A (4.6) [149] <0.69> A (7.3) [233] <0.66>
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn D (33.5) [<25] <0.09> F (55.4) [<25] <0.33>
Westbound Right Turn B (12.0) [<25] <0.02> C (20.0) [<25] <0.24>
Southbound Left Turn B (11.5) [<25] <0.21> B (14.6) [<25] <0.03>
Page 75 of 157
May 3, 2024
Page 21
29: Palmetto Bay Rd & William Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection F (56.0) F (60.3)
Eastbound Approach F (83.3) [375] <1.04> F (117.9) [550] 0.98>
Westbound Approach D (26.1) [200] <0.79> F (92.4) [425] <1.08>
Northbound Approach C (16.4) [125] <0.65> F (78.2) [525] <0.98>
Southbound Approach F (134.4) [900] <1.23> F (94.3) [675] <1.13>
# – 95th Percentile volume exceeds capacity
$ – Delay more than 300 seconds
m – Upstream metering is in effect
VISSIM Analysis
The travel time calculations and traffic volumes between the 2023 existing conditions and 2045 no build
conditions were evaluated. As shown in Table 7 and Table 8, several corridors and locations have negative
percent differences and the 2045 no build simulated volumes are less than the 2023 simulated volumes.
This is due to over-saturation of the study area and results in vehicles not being able to enter the netwo rk
to process through each intersection. During the AM peak hour, the eastbound travel time is expected to
increase by approximately 36% along Hilton Pkwy between Moss Creek and Indigo Run and by
approximately 46% along Hilton Pkwy at Moss Creek to Cross Island Pkwy at Sea Pines Circle. During the
PM peak hour, the westbound travel time is expected to increase by approximately 23% along Hilton
Pkwy between Moss Creek and Indigo Run and by approximately 62% along Hilton Pkwy at Moss Creek to
Cross Island Pkwy at Sea Pines Circle. Therefore, it is evident that the study area is expected to experience
significant congestion through the year 2045.
TABLE 7. 2045 NO BUILD VISSIM CALIBRATION TRAVEL TIME RESULTS
Corridor
Existing
Simulated travel
time (secs)
2045 No Build
Simulated travel
time (secs)
% Difference
AM PM AM PM AM PM
William Hilton Pkwy between
Moss Creek and Indigo Run
EB 1157 619 1579 642 36.47% 3.72%
WB 572 1252 584 1544 2.10% 23.32%
William Hilton Pkwy @Moss
Creek to Cross Island Pkwy @Sea
Pine
SB 1356 857 1984 873 46.31% 1.87%
NB 826 1520 823 2465 -0.36% 62.17%
Page 76 of 157
May 3, 2024
Page 22
TABLE 8. 2045 NO BUILD VISSIM CALIBRATION TRAFFIC VOLUMES RESULTS
Location
Existing
Simulated
volume results
(vehicles)
2045 No Build
Simulated
volume results
(vehicles)
% Difference
AM PM AM PM AM PM
William Hilton Pkwy west of Squire Pope
EB 2970 2240 2783 2524 -6.30% 12.68%
William Hilton Pkwy west of Squire Pope
WB 1650 2898 1843 2754 11.70% -4.97%
William Hilton Pkwy east of Spanish Wells
EB 2929 1955 2748 2198 -6.18% 12.43%
William Hilton Pkwy east of Spanish Wells
WB 1423 2614 1570 2413 10.33% -7.69%
Cross Island Pkwy north of Marshland Rd
NB 964 1371 1065 919 10.48% -32.97%
Cross Island Pkwy north of Marshland Rd
SB 1486 1167 1440 1299 -3.10% 11.31%
The 2045 no build operating conditions at the study intersections were evaluated using VISSIM and are
summarized in Table 9. As shown, the operating conditions largely agree with those shown in the 2045 no
build Synchro operating conditions (Table 6) and validate the travel time and volume conclusions above.
Significant congestion is expected throughout the study area through the year 2045. The congestion that
currently exists throughout the study area is expected to be exacerbated by 2045 with the forecasted
growth.
TABLE 9. 2045 NO BUILD OPERATING CONDITIONS (VISSIM)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection C (22.3) B (15.9)
Eastbound Approach C (26.6) [123] {700} B (18.5) [43] {241}
Westbound Approach B (14.0) [<25] {168} B (14.4) [32] {218}
Northbound Approach B (14.1) [<25] {68} B (14.5) [<25] {53}
Southbound Approach A (6.6) [<25] {56} A (8.5) [<25] {83}
Page 77 of 157
May 3, 2024
Page 23
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection E (74.1) B (18.6)
Eastbound Approach F (146.0) [1628] {1658} B (16.6) [86] {567}
Westbound Approach B (14.1) [37] {302} B (18.4) [86] {474}
Northbound Approach C (26.4) [25] {186} D (39.3) [<25] {91}
Southbound Approach D (35.8) [<25] {88} C (24.4) [<25] {119}
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (un-signalized)
Eastbound Left Turn F (54.8) [1075] {1304} C (18.8) [<25] {55}
Westbound Left Turn F (4,646.8) [142] {214} B (12.4) [<25] {45}
Northbound Approach B (12.3) [<25] {63} A (7.4) [<25] {62}
Southbound Approach D (29.4) [49] {107} A (8.1) [<25] {77}
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn F (3,675.2) [85] {146} C (19.0) [<25] {34}
Northbound Approach F (3,448.2) [171] {189} C (18.4) [<25] {43}
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (20.9) [902] {1658} D (26.6) [<25] {<25}
Westbound Left Turn No volumes observed C (21.4) [<25] {<25}
Northbound Approach F (426.9) [<25] {38} C (20.6) [<25] {47}
Southbound Approach No volumes observed C (17.5) [<25] {42}
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed F (131.6) [<25] {<25}
Northbound Approach F (2,505.2) [214] {351} E (49.9) [<25] {74}
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection A (9.5) B (13.4)
Eastbound Approach B (11.3) [433] {1093} B (10.6) [216] {1092}
Westbound Approach A (5.3) [26] {601} A (6.0) [86] {913}
Northbound Approach D (41.6) [<25] {138} F (237.4) [193] {326}
Southbound Approach A (9.8) [<25] {<25} A (0.0) [<25] {<25}
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Eastbound Left Turn B (14.4) [<25] {<25} D (32.0) [<25] {33}
Southbound Approach D (29.2) [<25] {47} E (43.5) [<25] {62}
Page 78 of 157
May 3, 2024
Page 24
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection C (26.8) E (70.7)
Eastbound Approach D (38.4) [361] {1332} B (13.9) [235] {1106}
Westbound Approach A (8.4) [55] {700} F (128.0) [1018] {1383}
Northbound Approach C (21.2) [<25] {42} E (67.4) [<25] {73}
Southbound Approach B (19.2) [<25] {189} F (80.3) [228] {693}
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach A (1.4) [<25] {26} A (8.0) [<25] {29}
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (30.3) F (328.8)
Eastbound Approach C (25.2) [169] {787} B (15.1) [98] {668}
Westbound Approach B (15.5) [80] {365} F (637.7) [896] {989}
Northbound Approach E (63.1) [122] {407} F (510.5) [1241] {1288}
Southbound Approach F (147.4) [192] {319} D (49.1) [51] {243}
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (51.9) E (76.0)
Eastbound Approach D (43.1) [838] {1562} D (50.4) [254] {711}
Westbound Approach C (31.2) [128] {375} E (76.3) [1203] {1623}
Northbound Approach D (38.8) [166] {334} F (92.7) [280] {356}
Southbound Approach F (143.1) [1039] {1452} F (121.3) [657] {1380}
13: Jarvis Park Rd/Wilborn Rd & William Hilton Pkwy (signal)
Overall Intersection C (22.3) C (33.4)
Eastbound Approach B (17.7) [169] {962} B (12.6) [51] {552}
Westbound Approach C (21.5) [106] {673} D (42.5) [907] {1289}
Northbound Approach E (67.4) [42] {178} F (281.4) [153] {297}
Southbound Approach D (36.9) [65] {225} C (25.8) [32] {153}
14: Pembroke Dr/Museum St & William Hilton Pkwy (signal)
Overall Intersection C (22.1) E (55.1)
Eastbound Approach B (17.8) [227] {1081} B (18.9) [99] {679}
Westbound Approach B (19.5) [72] {553} D (54.5) [998] {1279}
Northbound Approach D (52.8) [71] {260} F (260.2) [397] {719}
Southbound Approach C (31.1) [<25] {87} D (43.2) [<25] {114}
Page 79 of 157
May 3, 2024
Page 25
15: Central Ave & William Hilton Pkwy (un-signalized)
Eastbound Left Turn B (13.4) [<25] {<25} C (21.6) [87] {146}
Westbound Left Turn C (22.4) [<25] {25} C (21.8) [<25] {<25}
Northbound Right Turn C (16.2) [<25] {29} B (12.6) [<25] {31}
Southbound Right Turn B (12.3) [<25] {44} F (2,448.4) [87] {171}
16: Hatton Pl/Merchant St & William Hilton Pkwy (un-signalized)
Northbound Right Turn A (8.1) [<25] {<25} A (6.9) [<25] {64}
Southbound Right Turn B (11.0) [<25] {36} F (1,211.0) [123] {244}
17: Indigo Run Dr/Whooping Crane Way & William Hilton Pkwy (signal)
Overall Intersection C (24.5) E (66.7)
Eastbound Approach B (19.7) [107] {764} C (34.5) [115] {636}
Westbound Approach B (17.3) [53] {371} E (75.8) [1341] {1658}
Northbound Approach E (55.2) [32] {110} E (76.4) [65] {265}
Southbound Approach D (47.7) [57] {203} F (126.4) [327] {1023}
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un -signalized)
Eastbound Approach A (9.7) [<25] {45} B (12.1) [<25] {72}
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (4.5) [<25] {62} A (2.4) [<25] {67}
Southbound Left Turn A (9.8) [<25] {53} B (11.1) [<25] {79}
Southbound Right Turn A (6.1) [<25] {86} A (7.9) [<25] {112}
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (1.6) [<25] {49} A (1.5) [<25] {<25}
Northbound Left Turn B (11.9) [<25] {77} D (27.8) [46] {252}
Northbound Right Turn A (6.0) [<25] {102} A (8.0) [62] {277}
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed E (48.5) [<25] {35}
Eastbound Right Turn C (15.6) [<25] {<25} B (13.9) [<25] {32}
Northbound Left Turn B (12.8) [<25] {<25} A (7.8) [<25] {31}
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (14.0) B (18.2)
Eastbound Approach C (30.2) [51] {187} C (29.0) [38] {164}
Westbound Approach B (17.3) [<25] {108} C (28.2) [79] {337}
Northbound Approach B (12.4) [38] {311} B (15.5) [94] {596}
Southbound Approach B (11.6) [91] {737} B (16.3) [90] {601}
Page 80 of 157
May 3, 2024
Page 26
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach E (41.7) [<25] {57} D (25.4) [<25] {53}
Southbound Left Turn A (5.5) [37] {255} A (8.8) [<25] {<25}
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach F (65.1) [<25] {75} C (21.0) [<25] {59}
Southbound Left Turn A (5.7) [35] {176} B (12.8) [<25] {<25}
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn F (69.4) [46] {98} E (40.7) [<25] {48}
Westbound Right Turn A (9.1) [59] {131} B (13.1) [<25] {81}
Southbound Left Turn C (16.2) [551] {1040} B (14.1) [<25] {67}
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn F (1,234.0) [40] {69} D (31.8) [<25] {34}
Westbound Right Turn B (11.6) [62] {105} B (11.5) [<25] {70}
Southbound Left Turn C (16.2) [228] {469} B (12.0) [<25] {28}
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection C (26.9) B (18.6)
Eastbound Approach C (26.5) [<25] {105} D (37.6) [62] {250}
Westbound Approach C (34.2) [32] {157} C (26.1) [38] {144}
Northbound Approach B (12.5) [39] {235} B (15.4) [83] {522}
Southbound Approach C (33.5) [1209] {1511} B (15.6) [129] {820}
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn F (872.0) [62] {148} F (87.7) [<25] {97}
Westbound Right Turn E (36.3) [88] {182} B (13.0) [30] {132}
Southbound Left Turn C (20.8) [258] {513} B (13.1) [<25] {416}
29: Palmetto Bay Rd & William Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection F (60.5) F (81.8)
Eastbound Approach F (314.7) [808] {838} F (168.2) [805] {838}
Westbound Approach B (14.3) [56] {434} F (200.4) [1645] {1658}
Northbound Approach A (4.2) [<25] {207} F (61.1) [534] {794}
Southbound Approach C (34.4) [297] {461} A (8.2) [88] {460}
Page 81 of 157
May 3, 2024
Page 27
Alternative Analysis
As shown in both the 2023 existing and 2045 no build analysis, it is evident that improvements are
needed within the study area to accommodate the expected growth within the area. Therefore,
Lochmueller Group studied four alternatives to help improve the US 278 corridor. In determining the
most beneficial and appropriate alternatives, the following guiding principles , as stated by the Town of
Hilton Head, were top of mind:
• Fix the transportation issues in the corridor in a way that improves the safety and quality of life
for all residents, workers, and visitors to Hilton Head Island
a) Address transportation needs for natural disasters and resiliency of island access
b) Consider future transportation alternatives
• Improve the safety and quality of life for the residents of the neighborhoods and businesses
directly impacted by the US 278 corridor
a) Stoney Community
b) Neighborhoods on Jenkins and Hog Islands (including but not limited to Windmill Harbor)
• Have a gateway to and from Hilton Head Island that the region will be proud of:
a) Aesthetically pleasing and reflecting the Hilton Head Island/Low County values
b) Safe and functional pathways for pedestrians and cyclists
c) Minimizes environmental impacts and enhances the national asset of Pinckney Island
With the guiding principles in mind, the following four alternatives are recommended for further study:
• Alternative 1: SCDOT Modified Recommended Preferred
• Alternative 2: Bowties at Squire Pope and Spanish Wells
• Alternative 3: Echelon / Center Turn Overpass
a) Grade Separated Intersection at either Squire Pope or Spanish Wells , but not both
• Alternative 4: Elevated Bypass
As agreed upon with the Town of Hilton Head, the alternative analysis was completed for the modified
original project study area shown in Figure 2.
2045 Alternative 1: SCDOT Modified Recommended
Preferred
Alternative 1 considers the SCDOT Modified Recommended Preferred alternative with adaptive signals in
place and improvements at Gumtree Rd. The improvements at Gumtree Rd include keeping the
intersections at-grade, completely reconfiguring the intersection to improve its efficiency, and providing
dual left-turn lanes for the westbound, northbound, and southbound approaches. Figure 3 shows the
improvements recommended as part of Alternative 1, as provided by SCDOT. It should be noted that the
improvements at Gumtree Rd are not reflected in the figure provided by SCDOT.
Page 82 of 157
May 3, 2024
Page 28
2045 Alternative 1 Traffic Volumes
The traffic volumes used for the 2045 Alternative 1 analysis were largely similar to the 2045 no build
traffic volumes provided in Appendix C. However, some intersections were combined in this alternative,
requiring traffic diversions. The 2045 Alternative 1 traffic volumes are provided in Appendix D.
Page 83 of 157
May 3, 2024
Page 29
FIGURE 3. ALTERNATIVE 1: SCDOT MODIFIED RECOMMENDED PREFERRED
Page 84 of 157
May 3, 2024
Page 30
2045 Alternative 1 Traffic Analysis
As agreed upon with The Town of Hilton Head, the traffic analysis was completed using Synchro 11. The
2045 Alternative 1 operating conditions were evaluated using the same methodology applied to the
existing and no build conditions. The operating conditions for the 2045 Alternative 1 scenario are shown
in Table 10.
As shown, overall the study intersections are expected to operate acceptably under Alternative 1. Each
signalized intersection is expected to operate with a LOS D or better overall . However, side-street and
unsignalized approaches may still experience long delays. This is to be expected given the heavy volumes
experienced along the mainline of William Hilton Pkwy and the inability of side-street traffic to find gaps
in the mainline traffic to complete their movement.
TABLE 10. 2045 ALTERNATIVE 1 TRAFFIC OPERATING CONDITIONS (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (16.9) B (12.9)
Eastbound Approach B (16.2) [361] <0.54> A (8.7) [254] <0.50>
Westbound Approach C (20.4) [180] <0.38> B (12.1) [291] <0.86>
Northbound Approach B (17.1) [49] <0.08> D (47.7) [77] <0.11>
Southbound Approach A (7.2) [55] <0.18> C (27.1) [137] <0.23>
2: Buckingham Plantation Dr/Moss Creek Dr & William Hilton Pkwy (signal)
Overall Intersection B (14.8) C (19.1)
Eastbound Approach B (13.1) [283] <0.64> B (14.0) [274] <0.75>
Westbound Approach B (13.9) [223] <0.51> C (21.1) [348] <0.89>
Northbound Approach C (24.5) [120] <0.56> D (38.2) [97] <0.74>
Southbound Approach C (24.4) [80] <0.45> D (27.4) [169] <0.88>
3: Salt Marsh Dr/Moss Creek Village & William Hilton Pkwy (un-signalized)
Eastbound Left Turn C (18.9) [27] <0.04> F (65.8) [33] <0.33>
Westbound Left Turn E (44.8) [<25] <0.08> D (34.9) [<25] <0.22>
Northbound Approach B (14.2) [59] <0.31> C (11.4) [59] <0.30>
Southbound Approach B (17.0) [91] <0.63> F (173.4) [305] <2.05>
4: Fording Island Rd Ext & William Hilton Pkwy (un-signalized)
Westbound Left Turn D (27.4) [<25] <0.06> B (17.7) [34] <0.13>
Northbound Approach E (37.7) [53] <0.58> F (99.8) [127] <1.26>
Page 85 of 157
May 3, 2024
Page 31
5: Boat Landing Driveway/Wildlife Refuge Driveway & William Hilton Pkwy (un-signalized)
Northbound Right-Turn A (3.0) [<25] <0.00> A (1.3) [<25] <0.00>
Southbound Right-Turn No volumes observed A (2.9) [<25] <0.00>
6: Blue Heron Point Rd & William Hilton Pkwy (un-signalized)
Intersection combined with Crosstree Dr
7: Crosstree Dr (Windmill Harbour) & William Hilton Pkwy (signal)
Overall Intersection B (15.4) B (14.6)
Eastbound Approach B (18.6) [338] <0.82> B (11.6) [283] <0.70>
Westbound Approach A (8.4) [166] <0.45> B (19.6) [280] <0.92>
Northbound Approach D (52.9) [93] <0.35> E (60.4) [108] <0.72>
Southbound Approach C (31.0) [<25] <0.06> D (48.9) [30] <0.14>
8: Jenkins Rd & William Hilton Pkwy (un-signalized)
Intersection combined with Crosstree Dr
A: The Crazy Crab & William Hilton Pkwy (un-signalized)
Westbound Left-Turn F (169.2) [<25] <0.05> F (77.1) [<25] <0.02>
Northbound Right-Turn F (95.8) [<25] <0.02> E (39.3) [<25] <0.01>
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection B (18.1) C (23.3)
Eastbound Approach B (13.3) [852] <0.75> B (11.1) [467] <0.71>
Westbound Approach A (3.2) [91] <0.48> B (18.0) [522] <0.97>
Northbound Approach E (70.6) [263] <0.07> F (84.1) [#464] <0.29>
Southbound Approach D (52.9) [151] <0.58> E (65.6) [281] <0.70>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach C (17.0) [74] <0.36> E (43.2) [32] <0.20>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (26.0) C (20.9)
Eastbound Approach B (11.7) [354] <0.99> B (10.1) [216] <0.85>
Westbound Approach A (8.7) [350] <0.91> C (28.3) [1107] <0.99>
Northbound Approach E (73.5) [459] <0.66> E (70.9) [#609] <0.95>
Southbound Approach E (58.6) [411] <0.76> E (57.7) [430] <0.77>
Page 86 of 157
May 3, 2024
Page 32
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (38.8) D (38.4)
Eastbound Approach C (32.3) [655] <0.77> C (31.3) [489] <0.93>
Westbound Approach D (40.4) [310] <0.75> D (43.6) [554] <0.97>
Northbound Approach E (57.4) [375] <0.41> D (54.5) [319] <0.93>
Southbound Approach E (60.8) [293] <0.87> E (74.3) [298] <0.90>
In addition to the Synchro operating conditions, travel time calculations were performed in Synchro along
the William Hilton Pkwy corridor between Moss Creek and Indigo Run. It should be noted that VISSIM
provides more accurate travel time results than Synchro. However, for the purposes of comparing
alternatives, the Synchro results are shown as they still provide a reasonable comparison. The scope of
work will include a VISSIM analysis for the preferred alternative in which the travel time calculations will
be finalized. It is acknowledged that the travel time results from Synchro may understate the travel time
calculations when compared to VISSIM.
Table 11 shows the changes in travel time for the 2045 Alternative 1 scenario when compared to the 2045
no build scenario. As shown, Alternative 1 is expected to improve the travel time along eastbound William
Hilton Pkwy by approximately 16% during the AM peak period and westbound William Hilton Pkwy by
approximately 34% during the PM peak period.
It should be noted that westbound William Hilton Pkwy during the AM peak period and eastbound
William Hilton Pkwy during the PM peak period are not expected to experience significant congestion in
the 2045 no build scenario, as traffic patterns in the study area largely follow the commuter traffic.
Therefore, the increase in travel time shown is not expected to signi ficantly impact the operating
conditions of the study area.
TABLE 11. TRAVEL TIME COMPARISON FOR ALTERNATIVE 1
Scenario
Difference in Travel Time (seconds)
when Compared to 2045 No Build % Difference
AM PM AM PM
2045 Alternative 1: SCDOT Modified
Recommended Preferred
EB -109 +18 -16.1% 2.7%
WB +43 -276 6.3% -34.2%
2045 Alternative 1 Right-of-Way Impacts
The proposed modifications to the SCDOT Preferred Alternative in this alternative involve reconfiguring
the Gumtree Rd intersection to providing dual left-turn lanes for the westbound, northbound, and
southbound approaches. These improvements will require a strip of additional right of way of
approximately 0.2 acre on Town owned land, in the northeast quadrant to accommodate the additional
southbound left turn lane. The lane additions on the Westbound and northbound approache s can be
accommodated within existing right of way.
Page 87 of 157
May 3, 2024
Page 33
2045 Alternative 1 Environmental Analysis
As noted above, Alternative 1 would require 0.2 acre of additional ROW. The additional ROW impacts are
located within the Squire Pope neighborhood. The additional ROW to be acquired is owned by the Town
of Hilton Head. The SCDOT Environmental Assessment (EA) determined that this area is an environmental
justice community. One hazardous material site, Shell Food Mart Station 101 (165 William Hilton Pkwy), is
located near the alternatives. No impacts to the site are anticipated as a result of Alternative 1. T he
SCDOT recommended preferred alternative was determined to have a “may affect - not likely to adversely
affect” finding for threatened and endangered species. Alternative 1 is not anticipated to alter this
finding. Coordination with the USFWS and the NOAA National Marine Fisheries Service (NMFS) will need
to occur to affirm this finding. Alternative 1 would not result in additional impacts to NWI wetlands,
streams, floodplains, or essential fish habitat types. No additional relocations would occur as a res ult of
Alternative 1. No additional impacts to cultural resources or Section 4(f) properties would occur as a result
of Alternative 1. Please refer to the Technical Environmental Overview in Appendix H for additional
details.
2045 Alternative 2: Bowties at Squire Pope and Spanish
Wells
Alternative 2 considers bowties at Squire Pope Rd and Spanish Wells Rd with adaptive signals in place and
improvements at Gumtree Rd. The improvements at Gumtree Rd are the same as what was included in
Alternative 1, which keeps the intersections at-grade, reconfigures the intersection to improve its
efficiency, and provides dual left-turn lanes for the westbound, northbound, and southbound approaches.
A bowtie intersection removes left-turns from the intersection and requires vehicles to make a right-turn
at the signal rather than a left-turn. Vehicles must then navigate through roundabouts along the side-
street to return to the signal and continue through. Figure 4 shows an example of a bowtie intersection.
Note that this is only an example and not a schematic drawing of William Hilton Pkwy.
Page 88 of 157
May 3, 2024
Page 34
FIGURE 4. EXAMPLE BOWTIE INTERSECTION (PROVIDED BY VIRGINIA DOT)
Bowtie intersections provide several benefits. They improve safety as fewer conflicting vehicle and
pedestrian movements are allowed. Bowtie intersections have 12 fewer conflict points when compared to
traditional intersections, which have 32 conflict points. Bowtie intersections also encourage lower vehicle
speeds through the roundabouts. The size of main intersections can be reduced as left-turn lanes are
removed. Lastly, bowtie intersections increases the efficiency of the signalized intersections as more of
the signal time can go to the main through movements, improving traffic operations .
However, bowtie intersections require a change in decision making for drivers as all left-turn movements
would be required to navigate the adjacent roundabouts at Squire Pope Rd and Spanish Wells Rd. Bowtie
intersections also increases the amount of travel time for left-turning vehicles and require additional ROW
for the roundabouts.
Page 89 of 157
May 3, 2024
Page 35
2045 Alternative 2 Traffic Volumes
The traffic volumes used for the 2045 Alternative 2 analysis were largely similar to the 2045 no build
traffic volumes provided in Appendix C. However, given that the left-turns along William Hilton Pkwy were
removed at Squire Pope Rd and Spanish Wells Rd, some traffic diversions were necessary. The 2045
Alternative 2 traffic volumes are provided in Appendix E.
It should be noted that Lochmueller agrees with the improvements proposed along William Hilton Pkwy
between Moss Creek Dr and Crosstree Dr in Alternative 1. Therefore, those improvements were included
in Alternative 2. As such, the traffic volumes at those intersections would be the same between
Alternative 2 and Alternative 1.
2045 Alternative 2 Traffic Analysis
As agreed upon with The Town of Hilton Head, the traffic analysis was completed using Synchro 11. The
2045 Alternative 2 operating conditions were evaluated using the same methodology applied to the
existing and no build conditions. The operating conditions for the 2045 Alternative 2 scenario are shown
in Table 12.
As shown, the bowties at Squire Pope and Spanish Wells are expected to improve operations throughout
the study area. Overall, the study intersections are expected to operate acceptably under Alternative 2 .
Each signalized intersection is expected to operate with a LOS D or better overall . However, side-street
and unsignalized approaches may still experience long delays. Similar to Alternative 1, this is to be
expected given the heavy volumes experienced along the mainline of William Hilton Pkwy and the
inability of side-street traffic to find gaps in the mainline traffic to complete their movement.
TABLE 12. 2045 ALTERNATIVE 2 TRAFFIC OPERATING CONDITIONS (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection B (16.3) B (13.6)
Eastbound Approach B (15.8) [394] <0.82> B (14.7) [301] <0.65>
Westbound Approach B (11.5) [253] <0.45> B (11.3) [507] <0.95>
Northbound Approach E (60.4) [277] <0.78> D (44.0) [535] <0.94>
Southbound Approach B (12.2) [87] <0.62> D (51.8) [369] <0.82>
9A: Squire Pope North Bowtie (Roundabout)
Overall Intersection A (4.5) A (5.5)
Eastbound Approach A (3.7) [<25] A (4.4) [<25]
Westbound Approach A (3.4) [<25] A (3.9) [<25]
Northbound Approach A (4.2) [25] A (5.1) [25]
Southbound Approach A (4.7) [25] A (5.9) [50]
Page 90 of 157
May 3, 2024
Page 36
9B: Chamberlin Dr South Bowtie (Roundabout)
Overall Intersection A (4.2) A (4.9)
Eastbound Approach A (3.4) [<25] A (3.8) [<25]
Northbound Approach A (3.5) [<25] A (4.0) [<25]
Southbound Approach A (4.2) [25] A (5.0) [25]
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach C (17.0) [80] <0.36> F (51.5) [33] <0.20>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (23.7) C (21.2)
Eastbound Approach C (23.8) [519] <0.87> B (15.5) [348] <0.69>
Westbound Approach A (5.7) [118] <0.39> B (16.9) [357] <0.94>
Northbound Approach D (54.4) [486] <0.88> E (58.9) [560] <0.94>
Southbound Approach D (42.8) [369] <0.79> C (29.4) [245] <0.81>
11A: Wild Horse Rd North Bowtie (Roundabout)
Overall Intersection A (6.1) A (6.6)
Eastbound Approach A (4.4) [<25] A (4.7) [<25]
Northbound Approach A (6.3) [50] A (6.8) [50]
Southbound Approach A (5.7) [25] A (6.1) [25]
11B: Spanish Wells Rd South Bowtie (Roundabout)
Overall Intersection A (7.2) A (6.2)
Eastbound Approach A (4.7) [<25] A (4.0) [<25]
Northbound Approach A (7.9) [50] A (6.9) [50]
Southbound Approach A (6.6) [50] A (5.4) [25]
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (35.1) D (36.5)
Eastbound Approach D (40.2) [465] <0.88> C (29.7) [360] <0.93>
Westbound Approach B (19.4) [314] <0.41> D (32.9) [455] <0.97>
Northbound Approach C (32.2) [208] <0.75> D (44.2) [341] <0.93>
Southbound Approach E (57.8) [244] <0.86> E (57.9) [275] <0.90>
In addition to the Synchro operating conditions, travel time calculations were performed in Synchro along
the William Hilton Pkwy corridor between Moss Creek and Indigo Run. It should be noted that VISSIM
provides more accurate travel time results than Synchro. However, for the purposes of comparing
alternatives, the Synchro results are shown as they still provide a reasonable comparison. The scope of
work will include a VISSIM analysis for the preferred alternative in which the travel time calculations will
Page 91 of 157
May 3, 2024
Page 37
be finalized. It is acknowledged that the travel time results from Synchro may understate the travel time
calculations when compared to VISSIM.
Table 13 shows the changes in travel time for the 2045 Alternative 2 scenario when compared to the 2045
no build scenario. As shown, Alternative 2 is expected to improve the travel time along eastbound William
Hilton Pkwy by approximately 15% during the AM peak period and westbound William Hilton Pkwy by
approximately 36% during the PM peak period.
TABLE 13. TRAVEL TIME COMPARISON FOR ALTERNATIVE 2
Scenario
Difference in Travel Time (seconds)
when Compared to 2045 No Build % Difference
AM PM AM PM
2045 Alternative 2: Bowties at
Squire Pope and Spanish Wells
EB -104 -39 -15.3% -6.6%
WB +9 -290 1.4% -36.4%
As previously noted, bowtie intersections may increase the total travel time for left -turning vehicles as
they must alter their course to make a right-turn at the intersection and navigate through a roundabout
to complete their movement. Therefore, the expected change in travel time was calculated in Synchro to
better determine the additional time for the displaced left-turn movements. The changes in travel time
are shown in Table 14. As shown, it could take an additional two minutes for a vehicle making a
northbound left-turn at Squire Pope Rd to navigate through the bowtie intersection. However, several
left-turning movements, such as the eastbound left-turn at Spanish Wells Rd, are actually expected to
experience a decrease in travel time. This is likely due to the long delay those movements are expected to
experience in the 2045 no build scenario.
TABLE 14. EXPECTED CHANGE IN TRAVEL TIME FOR LEFT-TURNING VEHICLES
Intersection
Difference in Travel Time (seconds)
for Left-Turning Vehicles
AM PM
Squire Pope
EB Left-Turn +63 +42
WB Left-turn +82 +81
NB Left-Turn +101 +120
SB Left-Turn +44 +4
Spanish Wells
EB Left-Turn -10 -26
WB Left-turn -13 -7
NB Left-Turn +89 -42
SB Left-Turn +43 +61
Page 92 of 157
May 3, 2024
Page 38
2045 Alternative 2 Right-of-Way Impacts
The proposed Bowtie configurations of Alternative 2 will require the 0.2 acre of additional right of way at
Gumtree Rd as well as additional right of way along the crossroads to accommodate the construction of
the roundabouts.
At the Squire Pope Rd intersection, the north roundabout would be located along Squire Pope Rd at Old
Stony Ln, requiring approximately 0.2 acres of additional right of way from privately owned land. The
south roundabout would be located at the end of Chamberlin Rd and would require approximately 0.4
acre of additional right of way from Town owned land.
At the Spanish Wells Rd intersection, the north roundabout would be located along Wild Horse Rd at Old
Wild Horse Rd, requiring approximately 0.2 acre of additional right of way from Town owned land. The
south roundabout would be located south of Humane Way and would require approximately 0.1 acre of
additional right of way from Town owned land.
This alternative could potentially reduce the right of way required for the widening of William Hilton Pkwy
by 0.5 acre or more due to the elimination of the left turn lanes at the intersections.
2045 Alternative 2 Environmental Analysis
As noted above, Alternative 2 would require 1.10 acres of additional ROW. The Town of Hilton Head owns
0.9 acre of the ROW that would need to be acquired. The additional ROW impacts are located within the
Stoney and Squire Pope neighborhoods. The SCDOT EA determined that the Stoney neighborhood is an
environmental justice community. The Squire Pope neighborhood was outside of the SCDOT EA
investigation area but is also a Gullah community. The Gullah people are the only African American
population in the US that have maintained a separate language and a distinct culture. Therefore, Squire
Pope is likely an environmental justice community. The SCDOT recommended alternative was determined
to have a “may affect- not likely to adversely affect” finding for threatened and endangered species.
Alternative 2 is not anticipated to alter this finding. Coordination with the USFWS and the NOAA -NMFS
would need to occur to affirm this finding. Alternative 2 would require additional impacts to the Stoney
Traditional Cultural Property (TCP). The SCDOT identified the Stoney community as a TCP and as a
resource eligible for inclusion in the National Register of Historic Places (NRHP). As a NRHP -eligible
resource, it is also considered a Section 4(f) property. Alternative 2 would not result in additional impacts
to hazardous materials sites, NWI wetlands, streams, floodplains, or essential fish habitat types. No
additional relocations would occur as a result of Alternative 2. Please refer to the Technical Environmental
Overview in Appendix H for additional details.
2045 Alternative 3: Echelon / Center Turn Overpass
Alternative 3 considers either an echelon or a center turn overpass at either Squire Pope Rd or Spanish
Wells Rd. Echelons at both Squire Pope Rd and Spanish Wells Rd were not considered because there is not
enough room for both intersections to be grade separated. The same can be said for why center turn
overpasses were not considered at both Squire Pope and Spanish Wells.
Alternative 3 includes the adaptive signals in place as well as the previously detailed improvements at
Gumtree Rd. The improvements at Gumtree Rd are the same as what was included in Alternative 1, which
keeps the intersections at-grade, reconfigures the intersection to improve its efficiency, and provides dual
left-turn lanes for the westbound, northbound, and southbound approaches.
Page 93 of 157
May 3, 2024
Page 39
An echelon is a grade-separate intersection where one approach on both roadways is elevated. For
example, the northbound and eastbound approaches would be elevated and the southbound and
westbound approaches would remain at-grade to create two intersections. Both intersections would be
signalized and all pedestrian and bicycle movements would remain at-grade. Figure 5 shows an example
of an echelon. Note that this is only an example and not a schematic drawing of William Hilton Pkwy.
An echelon improves safety as fewer conflicting vehicle and pedestrian movements are allowed . Echelon
intersections have 10 fewer conflict points when compared to traditional intersections (32 conflict
points). They do not require a change in decision making for drivers as all movements would remain at
Squire Pope Rd and Spanish Wells Rd. Echelons increase the efficiency of the signalized intersections as
more of the signal time can go to the main through movements, improving traffic operations . While each
approach would likely need the same lane configurations as shown in Alternative 1, only two approaches
would conflict.
However, echelons do require grade separation of intersections and large intersections would likely
remain as all movements (left-turn, through, and right-turn) are still allowed.
A center turn overpass is also a grade-separated intersection which raises only the left-turn movements
from the main intersection using ramps to create two intersections. Both intersections would be
signalized and all pedestrian and bicycle movements would remain at-grade. Figure 6 shows an example
of a center turn overpass. Note that this is only an example and not a schematic drawing of William Hilton
Pkwy.
A center turn overpass improves safety as fewer conflicting vehicle and pedestrian movements are
allowed. Center turn overpass intersections have 8 fewer conflict points when compared to traditional
intersections (32 conflict points). They increase the efficiency of the signalized intersections as more of
the signal time can go to the main through movements, improving traffic operations and they reduce the
size of intersections as left-turn lanes are removed at-grade.
However, similar to echelons, center turn overpasses require grade separate and large intersections
would likely remain as all movements (left-turn, through, and right-turn) are still allowed.
FIGURE 5. EXAMPLE ECHELON (PROVIDED BY VIRGINIA DOT)
Page 94 of 157
May 3, 2024
Page 40
FIGURE 6. EXAMPLE CENTER TURN OVERPASS (PROVIDED BY VIRGINIA DOT)
2045 Alternative 3 Traffic Volumes
The traffic volumes used for the 2045 Alternative 3 analysis were largely similar to the 2045 no build
traffic volumes provided in Appendix C. However the traffic volumes for the intersections impacted by
Alternative 3 are provided in Appendix F.
It should be noted that Lochmueller agrees with the improvements proposed along William Hilton Pkwy
between Moss Creek Dr and Crosstree Dr in Alternative 1. Therefore, those improvements were included
in Alternative 3. As such, the traffic volumes at those intersections would be the same between
Alternative 3 and Alternative 1.
2045 Alternative 3 Traffic Analysis
As agreed upon with The Town of Hilton Head, the traffic analysis was completed using Synchro 11. The
2045 Alternative 3 operating conditions were evaluated using the same methodology applied to the
existing and no build conditions. The operating conditions for the 2045 Alternative 3 scenario are shown
in Table 15 through Table 18.
As shown, overall the study intersections are expected to operate acceptably under Alternative 3 . Each
signalized intersection is expected to operate with a LOS D or better overall for either configuration.
Similar to the previous scenarios, side-street and unsignalized approaches may still experience long
delays. The long queues and delay that are expected under the 2045 No Build Scenario would be expected
to be improved overall.
It should be noted that while operating conditions overall would be expected to improve when compared
to the 2045 no build conditions, some movements would be expected to experience failing levels of
service. When considering an echelon at Squire Pope Rd, the southbound approach at Squire Pope Rd is
expected to fail. This is caused by a reduction in green time for the heavy southbound right -turns.
Additionally, when considering a center turn overpass at Squire Pope Rd, the northbound approach at
Spanish Wells Rd is expected to experience failing operating conditions. This is due to the limited amount
of green time allowed for this movement under this scenario. However, overall each option in Alternative
3 is an improvement when compared to the 2045 no build scenario.
Page 95 of 157
May 3, 2024
Page 41
TABLE 15. 2045 ALTERNATIVE 3 TRAFFIC OPERATING CONDITIONS – ECHELON AT SPANISH WELLS (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection B (11.2) C (20.4)
Eastbound Approach B (12.4) [236] <0.75> C (24.4) [478] <0.89>
Westbound Approach A (7.7) [159] <0.48> B (15.5) [332] <0.94>
Northbound Approach D (41.3) [29] <0.03> E (62.3) [77] <0.28>
Southbound Approach B (16.7) [102] <0.57> C (26.9) [274] <0.83>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach A (4.2) [37] <0.36> A (4.8) [<25] <0.17>
11A: Wild Horse Rd & William Hilton Pkwy (signal) - Echelon
Overall Intersection B (10.8) B (12.8)
Westbound Approach A (7.2) [134] <0.38> B (11.5) [249] <0.82>
Southbound Approach C (34.5) [138] <0.58> C (32.8) [131] <0.53>
11B: Spanish Wells Rd & William Hilton Pkwy (signal) - Echelon
Overall Intersection B (18.3) B (12.4)
Eastbound Approach B (17.3) [474] <0.95> A (9.4) [288] <0.75>
Northbound Approach C (28.1) [147] <0.72> C (29.1) [233] <0.77>
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (44.6) D (44.2)
Eastbound Approach D (53.1) [449] <0.88> D (42.5) [406] <0.93>
Westbound Approach C (30.0) [479] <0.38> D (42.1) [824] <0.97>
Northbound Approach C (33.3) [213] <0.75> D (46.0) [356] <0.93>
Southbound Approach E (59.5) [239] <0.86> D (54.4) [274] <0.90>
Page 96 of 157
May 3, 2024
Page 42
TABLE 16. 2045 ALTERNATIVE 3 TRAFFIC OPERATING CONDITIONS - ECHELON AT SQUIRE POPE (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9A: Squire Pope Rd & William Hilton Pkwy (signal) - Echelon
Overall Intersection A (3.6) C (35.0)
Westbound Approach A (2.2) [57] <0.51> A (8.4) [258] <0.95>
Southbound Approach B (6.6) [156] <0.62> F (250.5) [858] <1.02>
9B: Chamberlin Dr & William Hilton Pkwy (signal) - Echelon
Overall Intersection C (25.9) A (4.6)
Eastbound Approach C (25.9) [263] <0.66> A (4.1) [167] <0.54>
Northbound Approach C (26.9) [151] <0.05> D (37.9) [66] <0.19>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach C (17.6) [85] <0.36> B (12.7) [<25] <0.17>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection D (35.5) D (39.6)
Eastbound Approach D (45.0) [906] <0.99> B (17.4) [369] <0.67>
Westbound Approach B (11.8) [168] <0.69> D (52.5) [984] <0.93>
Northbound Approach D (43.2) [167] <0.51> E (67.8) [239] <0.90>
Southbound Approach E (61.3) [214] <0.98> D (47.1) [166] <0.37>
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (35.5) D (42.4)
Eastbound Approach D (44.9) [464] <0.87> D (35.6) [399] <0.87>
Westbound Approach B (17.1) [204] <0.41> D (42.8) [801] <0.83>
Northbound Approach C (28.7) [202] <0.75> D (43.3) [364] <0.89>
Southbound Approach D (52.7) [230] <0.77> E (55.1) [260] <0.77>
Page 97 of 157
May 3, 2024
Page 43
TABLE 17. 2045 ALTERNATIVE 3 TRAFFIC OPERATING CONDITIONS - CENTER TURN OVERPASS AT SPANISH
WELLS
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection B (12.6) C (26.8)
Eastbound Approach B (11.4) [210] <0.75> D (39.0) [620] <0.81>
Westbound Approach B (14.5) [306] <0.48> B (16.3) [456] <0.96>
Northbound Approach D (49.0) [<25] <0.07> E (63.9) [64] <0.26>
Southbound Approach B (14.7) [99] <0.58> C (24.5) [292] <0.77>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach B (13.6) [78] <0.36> E (46.6) [36] <0.20>
11A: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection B (12.9) A (8.8)
Eastbound Approach B (13.8) [346] <0.87> A (8.6) [271] <0.62>
Westbound Approach A (5.9) [139] <0.64> A (5.7) [135] <0.75>
Northbound Approach C (32.4) [209] <0.81> C (34.6) [146] <0.62>
Southbound Approach E (59.8) [146] <0.51> E (56.6) [186] <0.69>
11B: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal) – Center Turn Overpass
Overall Intersection B (19.1) B (17.9)
Eastbound Approach B (16.3) [58] <0.07> B (12.2) [55] <0.08>
Northbound Approach C (20.1) [102] <0.22> B (19.2) [176] <0.46>
Southbound Approach B (18.8) [32] <0.02> B (16.9) [68] <0.11>
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (36.7) D (35.4)
Eastbound Approach D (48.2) [465] <0.87> C (31.9) [347] <0.93>
Westbound Approach B (17.1) [337] <0.41> C (30.9) [571] <0.97>
Northbound Approach C (28.6) [203] <0.75> D (37.4) [286] <0.93>
Southbound Approach D (51.2) [234] <0.77> E (58.8) [249] <0.90>
Page 98 of 157
May 3, 2024
Page 44
TABLE 18. 2045 ALTERNATIVE 3 TRAFFIC OPERATING CONDITIONS - CENTER TURN OVERPASS AT SQUIRE POPE
(SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9A: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection A (3.2) A (9.3)
Eastbound Approach A (3.5) [40] <0.78> A (4.8) [139] <0.64>
Westbound Approach A (2.0) [42] <0.43> A (7.4) [234] <0.93>
Northbound Approach D (37.3) [21] <0.05> E (68.1) [67] <0.11>
Southbound Approach A (6.1) [149] <0.77> D (48.3) [387] <0.89>
9B: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal) – Center Turn Overpass
Overall Intersection B (17.2) B (10.0)
Eastbound Approach B (15.9) [108] <0.21> A (3.9) [70] <0.65>
Westbound Approach B (10.6) [<25] <0.00> A (4.1) [<25] <0.95>
Northbound Approach B (18.8) [<25] <0.00> E (56.2) [<25] <0.94>
Southbound Approach C (21.8) [64] <0.10> D (40.9) [77] <0.82>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach C (17.4) [77] <0.36> E (42.4) [29] <0.20>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (32.4) C (31.3)
Eastbound Approach D (39.0) [771] <0.98> B (17.6) [369] <0.68>
Westbound Approach B (12.6) [149] <0.91> C (22.1) [446] <0.99>
Northbound Approach D (44.0) [162] <0.64> F (157.4) [766] <1.28>
Southbound Approach E (62.8) [220] <0.82> E (57.9) [152] <0.85>
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection D (35.8) D (36.4)
Eastbound Approach D (45.7) [473] <0.87> C (32.5) [387] <0.93>
Westbound Approach B (17.4) [263] <0.41> C (33.5) [651] <0.97>
Northbound Approach C (28.3) [199] <0.75> D (36.4) [277] <0.93>
Southbound Approach D (52.7) [228] <0.77> E (56.5) [262] <0.90>
Page 99 of 157
May 3, 2024
Page 45
In addition to the Synchro operating conditions, travel time calculations were performed in Synchro along
the William Hilton Pkwy corridor between Moss Creek and Indigo Run. It should be noted that VISSIM
provides more accurate travel time results than Synchro. However, for the purposes of comparing
alternatives, the Synchro results are shown as they still provide a reasonable comparison. The scope of
work will include a VISSIM analysis for the preferred alternative in which the travel time calculations will
be finalized. It is acknowledged that the travel time results from Synchro may understate the travel time
calculations when compared to VISSIM.
Table 19 shows the changes in travel time for the 2045 Alternative 3 scenario when compared to the 2045
no build scenario. As shown, between the four options provided in Alternative 3, the travel time
calculations indicate that the travel time along eastbound William Hilton Pkwy would improve between
approximately 18-32% during the AM peak period and westbound William Hilton Pkwy would improve
between approximately 41-60% during the PM peak period.
TABLE 19. TRAVEL TIME COMPARISON FOR ALTERNATIVE 3
Scenario
Difference in Travel Time (seconds)
when Compared to 2045 No Build % Difference
AM PM AM PM
2045 Alternative 3: Echelon at
Squire Pope
EB -191 -68 -32.1% -12.1%
WB -79 -407 -13.9% -60.0%
2045 Alternative 3: Echelon at
Spanish Wells
EB -140 -11 -21.6% -1.8%
WB -15 -331 -2.3% -44.0%
2045 Alternative 3: Center Turn
Overpass at Squire Pope
EB -122 +23 -18.4% 3.5%
WB -21 -319 -3.3% -41.6%
2045 Alternative 3: Center Turn
Overpass at Spanish Wells
EB -134 -17 -20.6% -2.9%
WB -16 -339 -2.5% -45.4%
2045 Alternative 3 Right-of-Way Impacts
The proposed Echelon or Center Turn Overpass configurations of Alternative 3 would still require the 0.2
acres of additional right of way at Gumtree Rd as well as additional right of way along William Hilton Pkwy
for turn lanes and additional right of way along the crossroads to accommodate the construction of the
turn arounds and/or roundabouts to maintain full access to parcels near the intersections.
At the Squire Pope Rd intersection, the north roundabout would be located along Squire Pope Rd at Old
Stony Ln, requiring approximately 0.2 acres of additional right of way from privately owned land. The
south roundabout would be located at the end of Chamberlin Rd and would require approximately 0.4
acres of additional right of way from Town owned land. Widening of Chamberlin Rd would require
approximately 0.05 acres of additional right of way from private land and 0.05 acres of right of way from
Page 100 of 157
May 3, 2024
Page 46
Town owned land. Widening along the north side of William Hilton Pkwy will require approximately 0.1
acres of additional right of way from Town owned land.
At the Spanish Wells Rd intersection, the north roundabout would be located along Wild Horse Rd at Old
Wild Horse Rd, requiring approximately 0.2 acres of additional right of way from Town owned land. The
south turn around would require approximately 0.35 acres of additional right of way from private land.
Widening along the south side of William Hilton Pkwy would require approximately 0.3 acres of additional
right of way from Town owned land and approximately 0.05 acres of additional right of way from private
land.
2045 Alternative 3 Environmental Analysis
The environmental impacts for Alternative 3 were evaluated for an echelon at the Squire Pope Road
intersection and an echelon at the Spanish Wells Road/Wild Horse Road intersection. A center turn
overpass would result in more impacts than an echelon at either intersection. Therefore, a center turn
overpass was dismissed from further consideration.
An echelon at the Squire Pope intersection would require the 1.0 acre of additional ROW. The Town of
Hilton Head owns 0.75 acre of the ROW that would need to be acquired. The additional ROW impacts are
located within the Stoney and Squire Pope neighborhoods. The SCDOT EA determined that the Stoney
neighborhood is an environmental justice community. The Squire Pope neighborhood is a Gullah
community and is likely an environmental justice community. The SCDOT recommended preferred
alternative was determined to have a “may affect- not likely to adversely affect” finding for threatened
and endangered species. An echelon at the Squire Pope intersection is not anticipated to alter this finding.
Coordination with the USFWS and the NOAA-NMFS would need to occur to affirm this finding. An echelon
at Squire Pope Road would result in additional impacts to the Stoney TCP, a cultural resource and Section
4(f) property. The addition of a grade separated intersection at Squire Pope Road also has the potential to
create visual barriers within the Stoney TCP. It would not result in additional impacts to hazardous
materials sites, NWI wetlands, streams, floodplains, or essential fish habitat types. No additional
relocations would occur as a result of Alternative 3.
An echelon at the Spanish Wells Road/ Wild Horse Road intersection would require 1.1 acres of additional
ROW. The Town of Hilton Head owns 0.7 acre of the ROW that would need to be acquired. The additional
ROW impacts are located within the Stoney and Squire Pope neighborhoods. The SCDOT EA determined
that the Stoney neighborhood is an environmental justice community. The Squire Pope neighborhood is a
Gullah neighborhood and likely an environmental justice community. The SCDOT recommended preferred
alternative was determined to have a “may affect- not likely to adversely affect” finding for threatened
and endangered species. An echelon at the Spanish Wells Road intersection is not anticipated to alter this
finding. Coordination with the USFWS and the NOAA-NMFS would need to occur to affirm this finding. An
echelon at Spanish Wells Road would result in 0.29 acre of additional impacts to floodplains. It would
result in additional impacts to the Stoney TCP, a cultural resource and Section 4(f) property. It would also
result in 0.03 acre of additional impacts to the public park at 152 William Hilton Pkwy, a Section 4(f)
property. The addition of a grade separated intersection at Spanish Wells Road / Wild Horse Road also has
the potential to create visual barriers within the Stoney TCP. An echelon at Spanish Wells Road would not
result in additional impacts to hazardous materials sites, NWI wetlands, streams, or essential fish habitat
types. No relocations would occur as a result of Alternative 3.
Please refer to the Technical Environmental Overview in Appendix H for additional details.
Page 101 of 157
May 3, 2024
Page 47
2045 Alternative 4: Elevated Bypass
Alternative 4 considers an elevated bypass which would begin west of Squire Pope Rd and end east of
Gumtree Rd. The elevated bypass will take the four internal lanes, two in each direction, and elevate them
over the study intersections. This would allow free-flow for the eastbound and westbound through traffic
from just east of the Jenkins Island causeway to just west of Wilborn Road. One lane in each direction
along William Hilton Parkway will remain at grade along with a separate eastbound right-turn lane at
Squire Pope Rd, and left-turn lanes at Squire Pope Rd and Spanish Wells Rd. This allows for full access to
be maintained at Squire Pope Rd and Spanish Wells Rd. Full access could also be provided at Old Wild
Horse Rd, which is currently a right-in/right-out intersection, in this scenario.
The elevated bypass will directly connect to the Cross Island Pkwy. In the eastbound direction, the two
eastbound lanes will expand to provide one lane to the Cross Island Pkwy, one lane to William Hilton
Pkwy at-grade for access to Gumtree Rd, and two lanes will continue along the elevated bypass and
connect to the at-grade section just east of Gumtree Rd, allowing through vehicles to also bypass
Gumtree Rd. In the westbound direction, two lanes will be provided along William Hilton Pkwy just east of
Gumtree Rd. These lanes will be reduced to one lane prior to the merge with the westbound Cross Island
Pkwy ramp. The westbound Cross Island Pkwy ramp and the single elevated westbound bypass ramp will
then merge into a two-lane elevated section.
Alternative 4 has the adaptive signals in place. However, the improvements needed at Gumtree Rd in
Alternatives 1, 2, and 3 would no longer be needed. In fact, the Gumtree Rd intersection would be able to
be reduced in size as most of the eastbound and westbound through traffic would remain on the bypass
rather than navigating through the intersection. Similarly, the at -grade intersections at Squire Pope Rd
and Spanish Wells Rd would also be able to be reduced in size. An elevated bypass would improve safet y
as fewer through vehicles would remain at grade, reducing the conflicts between vehicles and
pedestrians. In addition, the efficiency of the at-grade signalized intersections would be increased despite
the reduction in the size of the intersection. Lastly, the alternative p rovides the most room for growth
along the corridor.
However, this alternative would be the most expensive and would result in the largest construction
impact. Alternative 4 also requires grade separation and a change in decision making as drivers looking to
continue traveling eastbound or westbound would need to enter the bypass, rather than go through the
local intersections of Squire Pope Rd, Old Wildhorse Rd, and Spanish Wells Rd as they do today. Full
access would still be provided at-grade. Figure 7 through Figure 10 provide an example of the elevated
bypass.
Page 102 of 157
May 3, 2024
Page 48
FIGURE 7. EXAMPLE OF ELEVATED BYPASS - 01
FIGURE 8. EXAMPLE OF ELEVATED BYPASS - 02
Spanish
Wells Rd
Page 103 of 157
May 3, 2024
Page 49
FIGURE 9. EXAMPLE OF ELEVATED BYPASS - 03
FIGURE 10. EXAMPLE OF ELEVATED BYPASS - 04
US 278 – At Grade
Elevated Bypass
US 278 – At Grade
Spanish Wells Rd
Page 104 of 157
May 3, 2024
Page 50
2045 Alternative 4 Traffic Volumes
The traffic volumes used for the 2045 Alternative 4 analysis were largely similar to the 2045 no build
traffic volumes provided in Appendix C. However the traffic volumes for the intersections impacted by
Alternative 4 are provided in Appendix G.
It should be noted that Lochmueller agrees with the improvements proposed along William Hilton Pkwy
between Moss Creek Dr and Crosstree Dr in Alternative 1. Therefore, those improvements were included
in Alternative 4. As such, the traffic volumes at those intersections would be the same between
Alternative 4 and Alternative 1.
2045 Alternative 4 Traffic Analysis
As agreed upon with The Town of Hilton Head, the traffic analysis was completed using Synchro 11. The
2045 Alternative 4 operating conditions were evaluated using the same methodology applied to the
existing and no build conditions. The operating conditions for the 2045 Alternative 4 scenario are shown
in Table 20.
As shown, Squire Pope, Spanish Wells, and Gumtree would be expected to operate at an overall LOS C or
better. Overall, the study intersections are expected to operate acceptably under Alternative 4 . The
signalized intersections throughout the corridor are expected to operate with a LOS C or better overall.
Similar to the previous scenarios, side-street and unsignalized approaches throughout the corridor may
still experience long delays. It should be noted that the results provided are for the at-grade intersections
only and the operating conditions for the elevated bypass traffic are not provided in Synchro.
TABLE 20. 2045 ALTERNATIVE 4 TRAFFIC OPERATING CONDITIONS (SYNCHRO)
Intersection & Movements
LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & William Hilton Pkwy (signal)
Overall Intersection A (7.5) A (9.6)
Eastbound Approach A (4.1) [71] <0.23> A (4.7) [75] <0.42>
Westbound Approach A (6.5) [75] <0.27> A (6.5) [120] <0.46>
Northbound Approach A (6.7) [<25] <0.01> C (31.8) [38] <0.19>
Southbound Approach B (12.6) [58] <0.52> B (16.1) [103] <0.74>
10: Old Wild Horse Rd & William Hilton Pkwy (un-signalized)
Southbound Approach B (3.3) [<25] <0.11> B (11.9) [<25] <0.02>
11: Spanish Wells Rd/Wild Horse Rd & William Hilton Pkwy (signal)
Overall Intersection C (28.1) C (27.9)
Eastbound Approach B (13.2) [63] <0.43> B (15.0) [71] <0.44>
Westbound Approach C (24.6) [100] <0.60> B (13.2) [55] <0.32>
Northbound Approach C (27.0) [102] <0.65> D (39.6) [132] <0.78>
Southbound Approach D (47.1) [161] <0.75> D (46.5) [136] <0.73>
Page 105 of 157
May 3, 2024
Page 51
12: Gumtree Rd & William Hilton Pkwy (signal)
Overall Intersection C (26.0) C (28.5)
Eastbound Approach B (17.1) [115] <0.25> C (29.9) [142] <0.28>
Westbound Approach B (10.9) [142] <0.33> B (17.3) [205] <0.54>
Northbound Approach C (30.4) [212] <0.70> C (33.6) [266] <0.81>
Southbound Approach D (42.9) [250] <0.80> C (34.1) [211] <0.83>
In addition to the Synchro operating conditions, travel time calculations were performed in Synchro along
the William Hilton Pkwy corridor between Moss Creek and Indigo Run. It should be noted that VISSIM
provides more accurate travel time results than Synchro. However, for the purposes of comparing
alternatives, the Synchro results are shown as they still provide a reasonable comparison. The scope of
work will include a VISSIM analysis for the preferred alternative in which the travel time calculations will
be finalized. It is acknowledged that the travel time results from Synchro may understate the travel time
calculations when compared to VISSIM.
Table 21 shows the changes in travel time for the 2045 Alternative 4 scenario when compared to the 2045
no build scenario. As shown, Alternative 4 is expected to improve the travel time along the remaining at
grade eastbound William Hilton Pkwy by approximately 19% during the AM peak period and at grade
westbound William Hilton Pkwy by approximately 44% during the PM peak period. It should be noted that
the travel times reflect operations of at-grade intersections only. VISSIM software will allow for modeling
of bypass itself and will therefore yield greater reductions in travel times than those shown in the table.
TABLE 21. TRAVEL TIME COMPARISON FOR ALTERNATIVE 4
Scenario
Difference in Travel Time (seconds)
when Compared to 2045 No Build % Difference
AM PM AM PM
2045 Alternative 4: Elevated Bypass
EB -126 27 -19.1% 4.1%
WB +4 -330 0.5% -43.7%
2045 Alternative 4 Right-of-Way Impacts
The proposed Elevated Bypass Alternative can be constructed within the proposed right of way footprint
of the SCDOT Preferred alternative and, unlike the other alternatives, would not adding turn lanes to the
Gumtree Rd intersection and the additional strip of right of way required by those improvements,
resulting in no additional right of way being required for this alternative.
2045 Alternative 4 Environmental Analysis
Alternative 4 would impact an additional 0.03 acre of National Wetland Inventory (NWI) wetlands and an
additional 0.03 acre of essential fish habitats. Approximately 65 linear feet of Jarvis Creek would be
impacted. Alternative 4 would require no additional ROW. The SCDOT recommended preferred
alternative was determined to have a “may affect- not likely to adversely affect” finding for threatened
Page 106 of 157
May 3, 2024
Page 52
and endangered species. Alternative 4 is not anticipated to alter this finding. Coordination with the
USFWS and the NOAA-NMFS would need to occur to affirm this finding.
The Honey Horn Plantation is a collection of historic farm buildings and landscape and would be
considered a Section 4(f) resource. It is also home to the Coastal Discovery Museum, which educates the
public on the region’s cultural and natural history. Alternative 4 intersects the current boundary of Honey
Horn plantation according to the South Carolina Department of Archives and History website. This is
unlikely to be considered a Section 4(f) use as the proposed improvements associated with this
alternative would occur entirely within existing transportation ROW. Therefore, there is likely no
conversion of the resource from a non-transportation use to a transportation one. The current boundary
of the site extends into the existing footprint of U.S. 278. However, this part of the site has likely been
disturbed by previous construction. Further investigation and coordination with the applicable agencies
would be needed to determine the exact cultural and Section 4(f) impacts to this site. No additional
relocations would be required. The addition of an elevated bypass lane on a combination of fill or
structure also has the potential to create visual barriers within the Stoney TCP. However, this alternative
would not result in additional encroachment on the Stoney TCP and, as such, is not quantified as a direct
impact. No additional impacts to hazardous materials sites, neighborhoods, or environmental justice
communities are anticipated. No impacts to floodplains are anticipated. Please refer to the Technical
Environmental Overview in Appendix H for additional details.
Summary of Alternative Analysis
Based on the preceding analysis, a detailed matrix was prepared for each subcategory to compare
alternatives. The matrix for traffic operations is presented in Table 22.
Page 107 of 157
May 3, 2024
Page 53
TABLE 22. TRAFFIC OPERATIONS OVERVIEW MATRIX
Resource/Category
Alternative 1
(Mod. SCDOT Recommended
Preferred)
Alternative 2
(Bowties at Squire
Pope and Spanish
Wells)
Alternative 3
(Echelon / Center Turn
Overpass)
Alternative 4
(Elevated Bypass)
Travel Time along US 278 4 4 2 1
Overall Intersection
Operations 4 3 3 1
Side-Street Operations
4
Movements with a LOS F at a
signalized intersection:
Squire Pope:
• Northbound approach
(PM)
2
No movements have
a LOS F at a
signalized
intersection.
However, some
movements are
expected to have a
LOS E at signalized
intersections
between Squire
Pope and Gumtree.
4
Movements with a LOS F at a
signalized intersection:
Echelon at Squire Pope:
Squire Pope:
• Southbound approach
(PM)
Center Turn Overpass at Squire
Pope:
• Spanish Wells:
Northbound Approach
(PM)
1
All movements are
expected to have a
LOS D or better at
signalized
intersections
between Squire Pope
and Gumtree.
TOTAL 12 9 9 3
RANK 4 3 3 1
Page 108 of 157
May 3, 2024
Page 54
The matrix for bicycle and pedestrian impact is presented in Table 23.
TABLE 23. BICYCLE AND PEDESTRIAN OVERVIEW MATRIX
Resource/Category
Alternative 1
(Mod. SCDOT
Recommended Preferred)
Alternative 2
(Bowties at Squire Pope
and Spanish Wells)
Alternative 3
(Echelon / Center
Turn Overpass)
Alternative 4
(Elevated Bypass)
Pedestrian Crossing
Distance
Longest pedestrian
crossing distances.
Reduced pedestrian
crossing distances and
exposure to motor vehicle
traffic.
Reduced
pedestrian crossing
distances and
exposure to motor
vehicle traffic.
Reduced pedestrian crossing distances and
exposure to motor vehicle traffic.
Potential for Refuge
Islands
No refuge islands on north-
south crossings.
Potential for median
refuge island on east and
west crosswalk legs at
Squire Pope
Refuge islands
between
directional traffic
allow pedestrians
to more
comfortably
navigate the
complex
intersection.
Refuge islands between directional traffic
allow pedestrians to more comfortably
navigate the complex intersection; HOWEVER,
multiple refuge islands per leg and long end-
to-end crossing distances increase intersection
complexity and the likelihood of pedestrians
needing two or more stages to complete a
north-south crossing.
Conflict Points
Multiple turning
movements and potential
conflict points along each
leg.
Fewer ped/vehicle
conflict points and vehicle
turning movements.
Fewer ped/vehicle
conflict points and
vehicle turning
movements.
Fewer ped/vehicle conflict points and vehicle
turning movements.
Page 109 of 157
May 3, 2024
Page 55
The matrix for right-of-way impact is presented in Table 24.
TABLE 24. RIGHT-OF-WAY OVERVIEW MATRIX
Resource/Category
Alternative 1
(Mod. SCDOT
Recommended Preferred)
Alternative 2
(Bowties at Squire Pope
and Spanish Wells)
Alternative 3
(Echelon / Center Turn
Overpass)
Alternative 4
(Elevated Bypass)
Estimated Additional Right of Way
Acres – Public
Estimated Additional Right of Way
Acres – Private
Approx. TOTAL Additional Right of
Way Acres
0.2 ac
0.0 ac
0.2 ac
0.9 ac
0.2 ac
1.1 ac
0.7 ac
0.4 ac
1.1 ac
0 ac
Right of Way Score 2 4 4 1
Estimated Cost $426 $430M $440M to $450M $545M to $575M
Cost Score 1 2 3 4
Estimated Construction Duration 36 months 38 months 42 months 48 months
Construction Duration Score 1 2 3 4
TOTAL 4 8 10 9
RANK 1 2 4 3
Page 110 of 157
May 3, 2024
Page 56
The matrix for environmental impacts is presented in Table 25.
TABLE 25. ENVIRONMENTAL OVERVIEW MATRIX
Resource/Category Alternative 1 Alternative 2 Alternative 3 Alternative 4
NWI Wetlands 1 1 1 4
Streams 1 1 1 4
Floodplains 1 1 4 1
Essential Fish Habitat 1 1 1 4
Threatened & Endangered Species 1 1 1 1
Hazardous Material Sites 1 1 1 1
Relocations 1 1 1 1
Right-of-Way 2 4 4 1
Neighborhoods 2 4 4 1
Environmental Justice 2 4 4 1
Cultural Resources 1 4 4 4
Section 4(f) Resources 1 3 4 1
Total 15 26 30 24
Rank 1 3 4 2
Page 111 of 157
May 3, 2024
Page 57
Conclusions
Lochmueller Group evaluated the 2023 existing condition s, 2045 no build conditions, and four alternatives
for the year 2045. Based on the preceding analysis, an overall matrix was prepared to compare each
alternative. A score of 1 is the highest ranking, wh ereas a score of 4 is the lowest ranking. As shown, in
Table 26, Alternative 1 ranked first with a total score of 20. Alternative 4 ranked second with a total score
of 21. Alternative 2 ranked third with a total scor e of 24, and Alternative 3 ranked last with a total score of
28.
Page 112 of 157
May 3, 2024
Page 58
TABLE 26. OVERALL SCORING MATRIX
Resource/Category
Alternative 1
(Mod. SCDOT
Recommended
Preferred)
Alternative 2
(Bowties at Squire
Pope and Spanish
Wells)
Alternative 3
(Echelon / Center
Turn Overpass)
Alternative 4
(Elevated Bypass)
Traffic Operations
(Throughput and Traffic
Simulations)
4 3 3 1
ROW Impact 2 4 4 1
Environmental Impact 1 3 4 2
Safety 4 3 3 1
Bike/Pedestrian Impact 4 3 1 2
Community and Social Impact 1 3 4 2
Aesthetic 2 1 3 4
Cost 1 2 3 4
Construction Duration 1 2 3 4
TOTAL 20 24 28 21
RANK 1 3 4 2
Page 113 of 157
May 3, 2024
Page 59
Appendix
Appendix A. 2023 Existing Traffic Volumes
Appendix B. Growth Rate Memorandum
Appendix C. 2045 No Build Traffic Volumes
Appendix D. 2045 Alternative 1 Traffic Volumes
Appendix E. 2045 Alternative 2 Traffic Volumes
Appendix F. 2045 Alternative 3 Traffic Volumes
Appendix G. 2045 Alternative 4 Traffic Volumes
Appendix H. Technical Environmental Overview Memo
Page 114 of 157
May 3, 2024
Appendix A
Appendix A. 2023 Existing Traffic Volumes
1
2
4
3
1
AM Peak Hour Volumes PM Peak Hour Volumes
74
2
4 16
436
627
11
28
232
879
25
Bluffton Pkwy
Buckingham
Plantation Dr
2
US 278
Buckingham
Plantation Dr
3
78
0
8 68
1084
60
0
45
8
1792
2
US 278
Salt Marsh Dr
4
1162
414
15
1843
2
US 278
Fording
Island Rd Ext
1
99
12
2 10
923
2024
12
26
88
654
22
Bluffton Pkwy
Buckingham
Plantation Dr
2
122
36
67 45
1992
2150
40
20
94
1441
56
US 278
Buckingham
Plantation Dr
3
78
0
5 56
1980
280
0
40
24
1496
8
US 278
Salt Marsh Dr
4
US 278
Fording
Island Rd Ext
68
25
42 23
1119
2029
60
170
62
1590
35
2044
1620
20
1517
24
2023 Existing Traffic
Volumes
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0
0
0 0
1624
00
0
2
2
2763
41 3
1607
3014
0
402740
32
5
1634
6
4
6
2774
6
1622
02
10
2762
3
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
10
0
4 6
3001
22
0
6
4
2211
40 5
2975
5032
0
522195
30
10
3020
10
6
10
2237
6
3005
24
12
2213
8
US 278
Blue Heron
Point Rd
2023 Existing Traffic
Volumes
Page 115 of 157
May 3, 2024
Appendix A
9
10
11
12
9
AM Peak Hour Volumes PM Peak Hour Volumes
212
0
45 43
1425
22
0
5
156
2620
2
US 278
Squire Pope
Rd
11
12
70
127 56
1281
71121
43
121
43
2481
146
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
20
1394
76
267092
179
212 189
775
1938
144
290
154
1527
6
9
341
2
41 57
2687
22
25
2
222
1992
29
US 278
Squire Pope
Rd
11
33
78
62 84
2508
31259
47
60
51
1869
115
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
64
2736
10
2035107
183
242 326
1542
195224
207
277
125
1065
23
2023 Existing Traffic
Volumes
13
14
17
15
16
13
AM Peak Hour Volumes PM Peak Hour Volumes
181
27
244 302
953
223
45
0
253
1708
68
US 278
Jarvis Park
15
20 20
997
5
5
5
1676
5
US 278
Central Ave
16
US 278
Hatton Pl
14
US 278
Pembroke Dr
10 41
1012
101589
92 45
12
18 31
953
33259
21
37
80
1631
241
17
US 278
Indigo Run Dr
111
68
214 166
862
3380
51
33
129
1415
55
13
246
8
86 64
1761
456
8
10
113
1422
49
US 278
Jarvis Park
15
5 21
1515
5
10
5
1299
2
US 278
Central Ave
16
US 278
Hatton Pl
14
US 278
Pembroke Dr
10 10
1531
591304
5 51
27
14 27
1462
31316
35
37
57
1258
203
17
US 278
Indigo Run Dr
111
115
251 304
1366
5164
115
49
164
1152
47
2023 Existing Traffic
Volumes
Page 116 of 157
May 3, 2024
Appendix A
18
AM Peak Hour Volumes PM Peak Hour Volumes
6
374
2
0
Honey Horn Rd
Cross Island Pkwy SB
20
79
18471
58
126
122
Marshland Rd
Cross Island
Pkwy NB
19
Marshland Rd
Cross Island
Pkwy SB140
115
36
0
23
225
242
18
Honey Horn Rd
19
20
18
8
397
40
15
Honey Horn Rd
Cross Island Pkwy SB
20
37
305252
142
48
143
Marshland Rd
Cross Island
Pkwy NB
19
Marshland Rd
Cross Island
Pkwy SB420
137
78
2
61
130
135
2023 Existing Traffic
Volumes
22
23
21Bay Pines Rd
21
AM Peak Hour Volumes PM Peak Hour Volumes
0
1714
5
899
0
5
Bay Pines Rd
Palmetto Bay
22
Arrow Rd
Palmetto Bay
23
1603
16 5
5745
5
Genesta St
Palmetto Bay
53
1443
223 118
11
3844
672
34
114
15
138
21
10
1313
20
1721
10
10
Bay Pines Rd
Palmetto Bay
22
Arrow Rd
Palmetto Bay
23
1188
5 5
51537
4
Genesta St
Palmetto Bay
86
1062
175 328
36
38120
1346
76
67
29
93
2023 Existing Traffic
Volumes
Page 117 of 157
May 3, 2024
Appendix A
24
25
26
Bay Pines Rd
AM Peak Hour Volumes PM Peak Hour Volumes
24
5
5745
0
1583
25
Palmetto
Business Park
Palmetto Bay
25
5
5740
20
1548
40
Bow Cir
Palmetto Bay
26
5
10755
23
1503
50
Archer Rd
Palmetto Bay
24
10
51531
5
1188
5
Palmetto
Business Park
Palmetto Bay
25
10
101526
10
1183
10
Bow Cir
Palmetto Bay
26
10
101526
10
1183
10
Archer Rd
Palmetto Bay
2023 Existing Traffic
Volumes
27
28
29
27
AM Peak Hour Volumes PM Peak Hour Volumes
87
1279
147 53
34
9755
679
25
46
17
46
Target Rd
Palmetto Bay
28
Dunnagans
Alley
Palmetto Bay
29
465
688
158 160
252
18336
376
177
263
132
50
Green wood
Palmetto Bay
1306
116 10
5
749
50
27
53
1083
57 111
44
78111
1253
46
172
44
76
Target Rd
Palmetto Bay
28
Dunnagans
Alley
Palmetto Bay
29
Green wood
Palmetto Bay
1227
10 61
29
1349
10
484
667
105 383
347
12055
618
355
358
177
181
2023 Existing Traffic
Volumes
Page 118 of 157
May 3, 2024
Appendix B
Appendix B. Growth Rate Memorandum
Page 119 of 157
MEMORANDUM
Lochmueller Group (Lochmueller) was retained by the Town of Hilton Head Island to conduct an
independent study of the William Hilton Parkway (WH P) Gateway Corridor. This memorandum
summarizes the review of the existing Lowcountry Ar ea Transportation Study (LATS) Travel
Demand Model (TDM) and recommends future traffic gr owth at the William Hilton Parkway
Bridge connecting Hilton Head Island with the mainland. The future traffic growth estimation was
based on a thorough review of historic traffic volu mes, socio-economic trends for Jasper and
Beaufort Counties, and accommodation and restaurant tax revenues collected per year by the
Town of Hilton Head.
LATS TDM Evaluation
The Lowcountry TDM was updated in December 2021 wit h a new base year, 2019, and a new
horizon year, 2045. Lochmueller completed a thorough review of the TDM to determine its ability
to forecast traffic growth along WHP.
The detailed review of the LATS TDM revealed the following:
• The latest update was limited/minor in nature and d id not include any major model
changes.
• 2045 Horizon year roadway network did not include all future planned projects.
• Socio-economic (e.g., population, household, employ ment) growth for the horizon year
2045 was forecasted by simply extrapolating 2040 at tributes of the previous version of
the TDM.
• Socio-economic projections did not consider recent land-use plan updates from
municipalities within the TDM boundaries.
• The TDM update did not include a complete model re-estimation and re-calibration.
• The LATS Long-Range 2045 Transportation Plan forecasts 48,500 more future population
in Jasper and Beaufort Counties than incorporated into the TDM.
To: Shawn Colin, AICP (Town of Hilton Head)
Cc: Bryan McIlwee, PE (Town of Hilton Head)
Jim Iwanicki, PE (Town of Hilton Head)
From: Nate Nohren, PE, PTOE
Sharif Ullah, PE, PTP
Date: February 12, 2024
Subject: Independent Study of WHP Gateway Corridor
Traffic Forecasting Memorandum
Page 120 of 157
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 2 of 8
Based on these findings, Lochmueller staff determin ed the LATS TDM may not provide accurate
traffic forecasts for WHP. To that end, alternative methods of traffic forecasting were
investigated. First, key data indicators of traffic growth were researched.
Socio-Economic Trends for Hilton Head Island, Jasper County, and Beaufort
County
Hilton Head Island is located in Beaufort County. B eaufort and neighboring Jasper County
experienced significant growth over the last 20 yea rs. Table 1 shows population growth trends
for Beaufort and Jasper Counties and Hilton Head Is land based on the US Census. This data
reflects permanent residents.
Table 1: Population Trends 1
Geographic
Unit
Year Annual
Growth (%)
(2000 -2010)
Annual
Growth (%)
(2010 -2020) 2000 2010 2020
Beaufort
County
120,937 162,233 187,117 3.0 1.4
Jasper
County
20,678 24,777 28,791 1.8 1.5
Hilton
Head Island
33,862 37,099 37,661 0.9 0.2
As shown in Table 1 , both Beaufort and Jasper Counties experienced sig nificant population
growth since 2000. However, population growth was m uch slower between 2010 and 2020
compared to 2000 to 2010. Hilton Head Island experi enced a modest growth rate of 0.2% from
2010 and 2020.
Table 2 shows the total employment for Beaufort and Jasper Counties and Hilton Head Island for
2010 and 2020.
Page 121 of 157
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 3 of 8
Table 2: Total Employment Trend 1
Geographic
Unit
Year Annual
Growth (%)
(2010 -2020)
2010 2020
Beaufort
County 51,761 62,001 1.8
Jasper
County 6,522 9,819 4.2
Hilton Head
Island 21,346 21,854 0.2
As can be seen in Table 2 , both Jasper and Beaufort Counties experienced sig nificant growth in
jobs between 2010 and 2020. Overall job growth in H ilton Head Island was small and similar to
the island’s population growth rate.
Population Growth Projections for Beaufort and Jasper Counties
Population growth estimates are a key element in forecasting traffic growth for a region. For this
study, Lochmueller staff researched reliable population growth estimates for Beaufort and Jasper
counties. The State of South Carolina’s Revenue and Fiscal Affairs Office provides population
growth estimates for all counties within the state through 2035. Table 3 shows the population
projections for Beaufort and Jasper Counties for 2035 and the corresponding growth rates.
Table 3: Population Growth Projections 2
County
Year Annual
Growth
Rate (%) 2020 2035
Beaufort 187,691 204,374 0.56
Jasper 29,073 34,046 1
Total 216,764 238,420 0.6
Page 122 of 157
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 4 of 8
Historic Annual Average Daily Traffic Volume Trends at the WHP Bridge
Lochmueller staff obtained Annual Average Daily Tra ffic (AADT) volumes on WHP near the WHP
Bridge (Site ID #0035) from the South Carolina Department of Transportation’s Traffic Data Site 3.
Table 4 shows the AADT volumes by year. These volumes effe ctively represent the volume of
traffic entering and exiting Hilton Head Island via US 278.
As shown in Table 4 , there was a significant reduction in growth betwe en 2019 and 2020 and a
significant increase in growth between 2020 and 202 1. Such sudden changes were attributed to
COVID-19 pandemic-related restrictions. Overall tra ffic growth on WHP from 2010 to 2023 was
approximately 16.5%.
Table 4: AADT Volumes on WHP near the WHP Bridge
3
Year AADT Annual
Growth (%)
2010 49,600
2011 49,900 0.60%
2012 50,700 1.60%
2013 52,200 2.96%
2014 53,200 1.92%
2015 54,700 2.82%
2016 54,700 0.00%
2017 56,300 2.93%
2018 56,100 -0.36%
2019 57,100 1.78%
2020 51,400 -9.98%
2021 57,400 11.67%
2022 57,400 0.00%
2023 57,800 0.70%
Page 123 of 157
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 5 of 8
Short-Term Rental Permit and Tax Revenue Data
Lochmueller staff received information on the short -term rental units per year and the
accommodation (hotel) and restaurant tax revenues c ollected by the Town of Hilton Head. The
short-term rental unit information was available on ly for 2023. Thus, this information was not
used in statistical analysis. The accommodation and restaurant tax revenue information was
available from 2018 to 2023. Lochmueller staff eval uated the revenue data to test any relation
between revenues and the volume of traffic entering and exiting Hilton Head Island. These
measures are intended to represent the visitor popu lation as compared to permanent residents
reflected in the Census data. Table 5 shows the annual accommodation and restaurant tax
revenue information for the Town of Hilton Head Island.
Table 5: Annual Accommodation and Hospitality Tax (Source: Town of Hilton Head Island)
Year
Tax Revenue (2021 USD)
Accommodation
Tax
Hospitality
Tax
2018 $3,827,423 $7,419,881
2019 $3,964,475 $6,807,961
2020 $3,624,196 $6,598,684
2021 $5,561,900 $8,051,256
2022 $6,534,674 $9,213,533
2023 $6,260,297 $8,905,425
As shown in Table 5 , the tax revenues have increased significantly sin ce 2020 after a reduction
due to Covid-19 Pandemic-related impacts. These inc reases have outpaced traffic growth on
WHP entering/exiting the island and can be at least partially attributed to factors beyond the
number of visitors to the island, such as high rates of inflation in recent years.
Traffic Growth Estimation Using Available Data
Lochmueller staff performed regression analyses utilizing the preceding available socio-economic
and revenue information data as indicators of traffic on WHP at the WHP bridge. The regression
analyses considered AADT volumes as the dependent v ariable and evaluated whether different
independent variables (e.g., population, employment , tax revenue) had a statistically significant
influence on the AADT volumes.
In regression analysis, the coefficient of determination (R
2) and the P-values were used to identify
independent variables with significant impact on th e dependent variable. R 2 values explain to
what degree an independent variable (e.g., populati on) explains the variation of the dependent
variable (AADT). R2 values range from 0 to 1. An R 2 value of 0.7 indicates that 70% of the variation
in the output variable can be explained by the independent variable(s).
Page 124 of 157
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 6 of 8
The P-value is the probability that the observed di fference between the dependent and
independent variables is due to chance. Its value r anges from 0 to 1. A P-value close to 0 means
that any observed difference in the dependent varia ble is more likely due to the independent
variable (not by chance). For regression analysis w ith a 95% confidence interval, a P-value less
than 0.05 would represent a strong correlation betw een the dependent and independent
variables.
Table 6 shows the simple regression analysis (95% Confidence Interval) results in terms of R
2 and
P-values for various independent variables relative to the dependent variable (AADT).
Table 6: Simple Regression Analysis Results with Different Independent Variables
Independent Variable
Co-efficient of
Determination
(R 2)
P-Value
Total Population of Beaufort and
Jasper Counties 0.95 1.5E-08
Total Employment in Beaufort and
Jasper Counties 0.9 8.1E-07
Accommodation Tax 0.64 0.1
Hospitality Tax 0.37 0.28
As shown in Table 6, the total population and total employment in Beaufort and Jasper Counties
clearly influence the AADT volumes. P-values in both of these cases are very close to zero, which
confirms the differences in AADT are influenced by changes in population and employment
numbers in the two counties. On the other hand, there is no clear correlation between hospitality
tax and AADT and between accommodation tax and AADT.
Lochmueller staff also completed a more complex mul tiple regression analysis combining both
independent variables (population and employment). With the multiple regression analysis, the
adjusted R
2 value showed almost no improvement. Therefore, the simple regression analysis
using the total population of Beaufort and Jasper Counties was utilized to formulate an equation
for estimating AADT on WHP as a function of populat ion in the counties. Equation 1 shows the
regression equation for the AADT estimate.
Equation 1: Regression Equation for AADT Estimate
AADT = 0.262684*(Total Population of Beaufort and Jasper Counties) + 830
Page 125 of 157
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 7 of 8
Equation 1 was then used to forecast future traffic on WHP ba sed on anticipated population
growth. Lochmueller estimated the 2045 population of Beaufort and Jasper Counties utilizing the
following assumptions:
• Annual population growth in Hilton Head Island from 2020 to 2045 will be very small
(0.1%). As the population within Hilton Head Island is stable and available land for
development is very limited. Moreover, population growth in Hilton Head Island from
2010 to 2020 was only 0.2% per year.
• Annual population growth from 2020 and 2045 for the rest of Beaufort County and
Jasper County will be 0.6%, as suggested by the State of South Carolina’s Revenue and
Fiscal Affairs Office, referenced in Table 3 .
Based on the above-mentioned population growth assu mptions, Table 7 shows the projected
2045 population for the Beaufort and Jasper Counties.
Table 7: Projected Population
Geographic Unit
Projected
Annual
Growth
Rate
Population
2020 2045
Hilton Head Island 0.10% 37,661 38,614
Jasper County and
Beaufort County
(Excluding Hilton Head
Island)
0.60% 178,247 207,000
Total 215,908 245,614
As shown in Table 7 , the total population in 2045 for Beaufort and Jasper Counties was estimated
at 245,614. Applying Equation 1 , that population number would translate to 65,349 AADT on
WHP at the WHP Bridge.
Table 8 shows the estimated annual traffic growth rate fro m 2023 to 2045 based on the 2045
forecast of 65,425 compared to the 2023 traffic count.
Page 126 of 157
Independent Study of the WHP Gateway Corridor:
Traffic Forecasting Memorandum
February 12, 2024
Page 8 of 8
Table 8: Projected Traffic Growth Rate at the WHP Bridge
Year AADT
Annual
Growth
Rate (%)
2023 57,800 0.56
2045 65,349
Conclusion
Lochmueller determined that the LATS TDM may not be a reliable source of future traffic on WHP.
Through careful application of statistical analysis, an alternative method for forecasting traffic on
WHP was developed using the population of Beaufort and Jasper Counties as the key indicator.
Based on this method, traffic on WHP at the WHP Bridge is expected to increase by 0.56 percent
annually, resulting in an AADT forecast of 65,349 daily vehicles in 2045.
Lochmueller Group appreciates the opportunity to serve the Town of Hilton Head by performing
this independent analysis to determine the appropri ate annual background growth rate that
should be utilized for the overall corridor study. Should you have any questions regarding the
information shared within this technical memorandum , please do not hesitate to contact us at
nnohren@lochgroup.com or 217-821-8435.
Reference
1. U.S. Census Bureau (www.census.gov )
2. South Carolina Revenue and Fiscal Affairs Office. (www.rfa.sc.gov ).
3. South Carolina Department of Transportation Traffic Counts Website.
(www.scdot.org/travel/travel-trafficdata.aspx )
Page 127 of 157
May 3, 2024
Appendix C
Appendix C. 2045 No Build Traffic Volumes
2045 No Build Traffic Volumes
1
2
4
3
• 0.56% Annual Growth Rate Applied
1
AM Peak Hour Volumes PM Peak Hour Volumes
84
2
5 18
493
731
12
32
263
994
28
Bluffton Pkwy
Buckingham
Plantation Dr
2
US 278
Buckingham
Plantation Dr
3
88
0
9 97
1226
70
0
51
9
2026
2
US 278
Salt Marsh Dr
4
1314
516
17
2083
3
US 278
Fording
Island Rd Ext
1
112
14
2 11
1044
2327
14
29
100
739
25
Bluffton Pkwy
Buckingham
Plantation Dr
2
138
41
76 51
2252
2457
45
23
106
1629
63
US 278
Buckingham
Plantation Dr
3
88
0
6 63
2239
320
0
45
27
1692
9
US 278
Salt Marsh Dr
4
US 278
Fording
Island Rd Ext
77
28
47 26
1265
2333
68
192
70
1798
40
2311
1823
23
1716
27
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0
0
0 0
1837
00
0
2
2
3124
51 3
1818
3416
0
453098
36
6
1848
7
5
7
3136
6
1835
02
11
3123
3
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
11
0
5 7
3394
22
0
7
5
2499
50 6
3364
5736
0
592482
34
11
3416
11
7
11
2530
6
3398
25
14
2502
9
US 278
Blue Heron
Point Rd
Page 128 of 157
May 3, 2024
Appendix C
9
10
11
12
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
9
AM Peak Hour Volumes PM Peak Hour Volumes
240
0
51 49
1612
22
0
6
176
2963
2
US 278
Squire Pope
Rd
11
14
79
144 63
1449
80137
49
137
49
2806
165
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
23
1577
86
3020104
202
240 214
876
2189
163
328
174
1727
7
9
386
2
46 64
3039
22
28
2
251
2253
33
US 278
Squire Pope
Rd
11
37
88
70 95
2837
35293
53
68
58
2113
130
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
73
3094
11
2301121
207
274 369
1745
220253
234
313
141
1204
26
13
14
17
15
16
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
13
AM Peak Hour Volumes PM Peak Hour Volumes
205
31
276 341
1077
226
51
0
286
1932
77
US 278
Jarvis Park
15
23 23
1125
6
6
6
1895
6
US 278
Central Ave
16
US 278
Hatton Pl
14
US 278
Pembroke Dr
11 46
1143
121797
104 51
14
20 35
1076
37293
24
42
90
1845
273
17
US 278
Indigo Run Dr
126
77
242 188
973
3790
58
37
146
1601
62
13
278
9
97 72
1993
563
9
11
128
1608
55
US 278
Jarvis Park
15
6 24
1715
6
11
6
1468
6
US 278
Central Ave
16
US 278
Hatton Pl
14
US 278
Pembroke Dr
11 11
1734
661473
6 58
30
16 31
1655
35357
39
42
64
1422
230
17
US 278
Indigo Run Dr
126
130
284 344
1547
5872
130
55
185
1301
53
Page 129 of 157
May 3, 2024
Appendix C
2045 No Build Traffic Volumes
18
AM Peak Hour Volumes PM Peak Hour Volumes
7
422
2
0
Honey Horn Rd
Cross Island Pkwy SB
20
89
20880
66
142
138
Marshland Rd
Cross Island
Pkwy NB
19
Marshland Rd
Cross Island
Pkwy SB158
130
41
0
26
254
274
18
Honey Horn Rd
19
20
18
9
449
45
17
Honey Horn Rd
Cross Island Pkwy SB
20
42
345285
161
54
162
Marshland Rd
Cross Island
Pkwy NB
19
Marshland Rd
Cross Island
Pkwy SB475
155
88
2
69
147
153
• 0.56%
Annual
Growth
Rate
Applied
22
23
21Bay Pines Rd
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
21
AM Peak Hour Volumes PM Peak Hour Volumes
0
1938
7
1018
0
0
Bay Pines Rd
Palmetto Bay
22
Arrow Rd
Palmetto Bay
23
1813
18 6
6842
8
Genesta St
Palmetto Bay
60
1632
252 135
12
4350
760
38
130
17
156
21
11
1486
21
1947
11
11
Bay Pines Rd
Palmetto Bay
22
Arrow Rd
Palmetto Bay
23
1343
6 6
61737
5
Genesta St
Palmetto Bay
98
1201
198 371
41
43136
1521
86
76
33
105
Page 130 of 157
May 3, 2024
Appendix C
24
25
26
Bay Pines Rd
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
AM Peak Hour Volumes PM Peak Hour Volumes
24
6
6842
0
1791
28
Palmetto
Business Park
Palmetto Bay
25
6
6836
23
1752
45
Bow Cir
Palmetto Bay
26
6
11853
26
1702
56
Archer Rd
Palmetto Bay
24
11
61731
6
1343
6
Palmetto
Business Park
Palmetto Bay
25
11
111726
11
1338
11
Bow Cir
Palmetto Bay
26
11
111726
11
1338
11
Archer Rd
Palmetto Bay
27
28
29
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
27
AM Peak Hour Volumes PM Peak Hour Volumes
98
1449
166 60
38
11062
767
28
52
19
52
Target Rd
Palmetto Bay
28
Dunnagans
Alley
Palmetto Bay
29
526
778
179 181
285
20741
425
200
297
149
57
Green wood
Palmetto Bay
1472
139 7
11
850
53
27
60
1225
64 126
50
88126
1417
52
194
50
86
Target Rd
Palmetto Bay
28
Dunnagans
Alley
Palmetto Bay
29
Green wood
Palmetto Bay
1388
11 69
32
1526
11
547
754
119 433
392
13662
699
401
405
200
205
Page 131 of 157
May 3, 2024
Appendix D
Appendix D. 2045 Alternative 1 Traffic Volumes
*Note: Volumes not shown are the same as the 2045 No Build Traffic Volumes
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0 0
1837
23124
78
0
5 9
1811
3418
0
56
7
3080
39
1854
3141
6
1837
3126
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
13 9
3394
122499
1011
1
7
17
3353
5741
1
73
11
2457
43
3427
2537
6
3405
2511
US 278
Blue Heron
Point Rd
Intersections removed and
traffic consolidated to
Crosstree Dr
2045 Alternative 1. Modified
Recommended Traffic
Volumes
Page 132 of 157
May 3, 2024
Appendix E
Appendix E. 2045 Alternative 2 Traffic Volumes
*Note: Volumes not shown are the same as the 2045 No Build Traffic Volumes
9A
AM Peak Hour Volumes PM Peak Hour Volumes
1
292
1 1
1
14
1
225
1
1
1
1
Squire Pope
Rd
9
243
53 51
1612
178
572963
178
US 278
Squire Pope
Rd
9B
Squire Pope
Rd
10
US 278
Old Wild
Horse Rd
23
1577
86
3020 1
2
229
1
6
1
1
9A
1
435
1 1
1
14
1
341
1
1
1
1
Squire Pope
Rd
9
389
50 66
3039
279
482253
284
US 278
Squire Pope
Rd
9B
Squire Pope
Rd
10
US 278
Old Wild
Horse Rd
73
3094
11
2301 1
37
297
1
30
1
1
9
10
9A
9B
2045 Alternative 2. Bowties at
Spanish Wells and Squire
Pope Traffic Volumes
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0 0
1837
23124
78
0
5 9
1811
3418
0
56
7
3080
39
1854
3141
6
1837
3126
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
13 9
3394
122499
1011
1
7
17
3353
5741
1
73
11
2457
43
3427
2537
6
3405
2511
US 278
Blue Heron
Point Rd
Intersections removed and
traffic consolidated to
Crosstree Dr
2045 Alternative 1. Modified
Recommended Traffic
Volumes
2045 Alternative 2. Bowties at
Spanish Wells and Squire
Pope Traffic Volumes
Page 133 of 157
May 3, 2024
Appendix E
11A
AM Peak Hour Volumes PM Peak Hour Volumes
1
237
217
1
261
1
1
Spanish Wells
Rd
11
151
303 143
1449
335
2812806
214
US 278
Spanish Wells
Rd
11B
Spanish
Wells Rd
1
324
193
1
423
1
1
Old Wild
Horse Rd
11A
1
195
328
1
206
1
1
Spanish Wells
Rd
11
330
193 130
2837
404
1382113
188
US 278
Spanish Wells
Rd
11B
Spanish
Wells Rd
1
253
128
1
414
1
1
Old Wild
Horse Rd
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
11
12
11A
11B
2045 Alternative 2. Bowties at
Spanish Wells and Squire
Pope Traffic Volumes
Page 134 of 157
May 3, 2024
Appendix F
Appendix F. 2045 Alternative 3 Traffic Volumes
*Note: Volumes not shown are the same as the 2045 No Build Traffic Volumes
AM Peak Hour Volumes PM Peak Hour Volumes
11A
11B
11B
US 278
Spanish Wells
Rd
US 278
Spanish Wells
Rd
11A
14
79
144 63
1449
80
137
49
137
49
2806
165
9B
US 278
Spanish Wells
Rd
US 278
Spanish Wells
Rd
11A
37
88
70 95
2837
35
293
53
68
58
2113
130
11B
12
2045 Alternative 3. Echelon at
Spanish Wells
Traffic Volumes
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0 0
1837
23124
78
0
5 9
1811
3418
0
56
7
3080
39
1854
3141
6
1837
3126
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
13 9
3394
122499
1011
1
7
17
3353
5741
1
73
11
2457
43
3427
2537
6
3405
2511
US 278
Blue Heron
Point Rd
Intersections removed and
traffic consolidated to
Crosstree Dr
2045 Alternative 1. Modified
Recommended Traffic
Volumes
2045 Alternative 3. Echelon at
Spanish Wells
Traffic Volumes
Page 135 of 157
May 3, 2024
Appendix F
AM Peak Hour Volumes PM Peak Hour Volumes
9A
9B
9B
US 278
Squire Pope
Rd
US 278
Squire Pope
Rd
9A
241
0
51 49
1612
2
2
0
6
176
2963
2
9B
US 278
Squire Pope
Rd
US 278
Squire Pope
Rd
9A
387
2
46 64
3039
2
2
28
2
251
2253
33
9B
12
2045 Alternative 3. Echelon at
Squire Pope
Traffic Volumes
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0 0
1837
23124
78
0
5 9
1811
3418
0
56
7
3080
39
1854
3141
6
1837
3126
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
13 9
3394
122499
1011
1
7
17
3353
5741
1
73
11
2457
43
3427
2537
6
3405
2511
US 278
Blue Heron
Point Rd
Intersections removed and
traffic consolidated to
Crosstree Dr
2045 Alternative 1. Modified
Recommended Traffic
Volumes
2045 Alternative 3. Echelon at
Squire Pope
Traffic Volumes
Page 136 of 157
May 3, 2024
Appendix F
AM Peak Hour Volumes PM Peak Hour Volumes
11A
11B
11B
14
79
63
1449
80
49
1372806
165
US 278
Spanish Wells
Rd
US 278
14
137
49
Spanish Wells
Rd
11A
11B
37
88
95
2837
35
53
682113
130
US 278
Spanish Wells
Rd
US 278
70
293
58
Spanish Wells
Rd
11A
11B
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
12
2045 Alternative 3. Center
Turn Overpass at Spanish
Wells Traffic Volumes
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0 0
1837
23124
78
0
5 9
1811
3418
0
56
7
3080
39
1854
3141
6
1837
3126
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
13 9
3394
122499
1011
1
7
17
3353
5741
1
73
11
2457
43
3427
2537
6
3405
2511
US 278
Blue Heron
Point Rd
Intersections removed and
traffic consolidated to
Crosstree Dr
2045 Alternative 1. Modified
Recommended Traffic
Volumes
2045 Alternative 3. Center
Turn Overpass at Spanish
Wells Traffic Volumes
Page 137 of 157
May 3, 2024
Appendix F
AM Peak Hour Volumes PM Peak Hour Volumes
9A
9B
9B
US 278
Squire Pope
Rd
US 278
Squire Pope
Rd
9A
14
79
144 63
1449
80
137
49
137
49
2806
165
9B
US 278
Squire Pope
Rd
US 278
Squire Pope
Rd
9A
37
88
70 95
2837
35
293
53
68
58
2113
130
9B
12
2045 Alternative 3. Center
Turn Overpass at Squire Pope
Traffic Volumes
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0 0
1837
23124
78
0
5 9
1811
3418
0
56
7
3080
39
1854
3141
6
1837
3126
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
13 9
3394
122499
1011
1
7
17
3353
5741
1
73
11
2457
43
3427
2537
6
3405
2511
US 278
Blue Heron
Point Rd
Intersections removed and
traffic consolidated to
Crosstree Dr
2045 Alternative 1. Modified
Recommended Traffic
Volumes
2045 Alternative 3. Center
Turn Overpass at Squire Pope
Traffic Volumes
Page 138 of 157
May 3, 2024
Appendix G
Appendix G. 2045 Alternative 4 Traffic Volumes
*Note: Volumes not shown are the same as the 2045 No Build Traffic Volumes
2045 Alternative 4.
Elevated Bypass
A
9
10
11
9
AM Peak Hour Volumes PM Peak Hour Volumes
240
0
51 49
237
22
0
6
176
170
2
US 278
Squire Pope
Rd
10
US 278
Old Wild
Horse Rd23
202
86
1
1
227
9
387
2
46 64
398
22
28
2
251
169
33
US 278
Squire Pope
Rd
A
EB US 278
At-Grade
11
14
79
144 63
74
80137
49
137
49
13
165
US 278
Spanish Wells
Rd
11
37
88
70 95
196
35293
53
68
58
29
130
US 278
Spanish Wells
Rd
WB US 278
At-Grade
Elevated
Bypass
348
479
1375
2793
A
EB US 278
At-Grade
WB US 278
At-Grade
Elevated
Bypass
453
786
2641
2084
10
US 278
Old Wild
Horse Rd73
453
11
1
1
216
12
2045 Alternative 4.
Elevated Bypass
C
D
AM Peak Hour Volumes PM Peak Hour Volumes
12
US 278
Gumtree Rd
B
104
202
240 214
104
2189
163
328
174
201
7
12
US 278
Gumtree Rd
121
207
274 369
105
220100
234
313
141
256
26
D
EB US 278
At-Grade
WB US 278
At-Grade
Elevated
Bypass
769
536
772
1526
D
EB US 278
At-Grade
WB US 278
At-Grade
Elevated
Bypass
843
694
1640
948
B
C
1375
B
2641
EB Elevated Bypass2793
1526
C
EB Elevated Bypass2084
948
Page 139 of 157
May 3, 2024
Appendix H
Appendix H. Technical Environmental Overview Memo
Page 140 of 157
MEMO
To: Nathan Nohren, PE, PTOE, Senior Traffic Engineer
From: Chad Costa, Environmental Department Manager, Ashley Taylor, Environmental
Specialist, and Samantha Beaupre, Environmental Specialist
Date: May 3, 2024
Subject: William Hilton Parkway Gateway Corridor – Technical Environmental Overview
1.0 Regulation Overview
This section encompasses a brief description of the applicable laws and regulations pertaining to the
human and natural environment, which help shape the decision -making process for projects with Federal
funding.
1.1 National Environmental Policy Act
The Federal Highway Administration (FHWA) is required by the National Environmental Policy Act (NEPA)
to evaluate potential impacts to the social, economic, and natural environments for the proposed
reasonable alternatives. According to the NEPA federal government website (www.nepa.gov
), Section 101
(42 U.S.C. §4331(a)) of NEPA sets forth a national policy "to use all practicable means and measures,
including financial and technical assistance, in a manner calculated to foster and promote the general
welfare, to create and maintain conditions under which man and nature can exist in productive harmony,
and fulfill the social, economic, and other requirements of present and future generations of Americans. ”
Section 102 (
42 U.S.C. §4332(2)(C)) of NEPA “establishes procedural requirements, applying that national
policy to proposals for major Federal actions significantly affecting the quality of the human environment
by requiring Federal agencies to prepare a detailed statement on: (1) the environmental i mpact of the
proposed action; (2) any adverse effects that cannot be avoided; (3) alternatives to the proposed action;
(4) the relationship between local short-term uses of man’s environment and the maintenance and
enhancement of long-term productivity; and (5) any irreversible and irretrievable commitments of
resources that would be involved in the proposed action.”
1.2 Clean Water Act
The Clean Water Act (CWA) (33 U.S.C. §1251) establishes the basic structure for regulating discharges of
pollutants into the waters of the United States and regulating quality standards for surface waters.
1.3 Endangered Species Act
The Federal Endangered Species Act (ESA) of 1973 (16 U.S.C. §1531) is the federal regulation whose goal is
“to protect and recover imperiled species and the ecosystems upon which they depend.” The U.S. Fish
and Wildlife Service (USFWS) manages terrestrial and freshwater organisms while the National Oceanic
and Atmospheric Administration (NOAA) Fisheries manages marine and anadromous species. Both
administer the ESA and establish a list of protected species.
1.4 Marine Mammal Protection Act
The Marine Mammal Protection Act (MMPA) of 1972 (16 U.S.C. 1361) prohibits, the “take” of marine
mammals in U.S. waters and by U.S. citizens on the high seas, and the importation of marine mammals
and marine mammal products into the U.S. Jurisdiction for MMPA is shared by USFWS and NOAA
Fisheries.
Page 141 of 157
May 3, 2024
Page 2
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
1.5 Section 106 of the National Historic Preservation Act
Section 106 of the National Historic Preservation Act (NHPA) (16 U.S.C. §470) requires Federal agencies to
take into account the effect of federal undertakings on historic properties and provide the Advisory
Council of Historic Preservation (ACHP) an opportunity to comment on the undertaking. The NHPA
established the National Register of Historic Places (NRHP). Items considered for the NRHP include
districts, sites, buildings, structures, and objects significant in American history, architecture, archaeology,
and culture, which possess national, state, or local significance. The NHPA also provides funding for the
State Historic Preservation Officer (SHPO) and staff to conduct surveys and develop comprehensive
preservation planning standards for state programs.
1.6 Section 4(f) of the U.S. Department of Transportation Act
Section 4(f) of the U.S. Department of Transportation (USDOT) Act of 1966 states that USDOT -funded
projects are prohibited from using land from certain properties unless there is no feasible and prudent
alternative to the use of the Section 4(f) resource. The proposed action must also include planning to
minimize harm to the property that would result from such use. The purpose of Section 4(f) is to protect
historic sites and publicly owned park and recreation lands and wildlife and waterfowl refuges. Secti on
4(f) properties are defined by 23 U.S.C. §138 and the Section 4(f) Policy Paper
as “any publicly owned land
from a public park, recreation area, of wildlife and waterfowl refuge of national, state, or local significance
as determined by the federal, state, or local officials having jurisdiction thereof, or any land from an
historic site of national, state, or local significance as so determined by such officials.” The law prevents
agencies within the USDOT from approving a project that “uses” land from publicly owned parks,
recreational areas, wildlife and waterfowl refuges, or public and private historical sites providing, 1) there
is no feasible and prudent alternative to the use of the resource, 2) the project includes measures t o
minimize harm to the resource, or 3) the agency determines the use of the resource is considered to be a
de minimis impact. A “use” is considered to be the conversion of a Section 4(f) property from a non -
transportation use to a transportation use.
1.7 Environmental Justice
Executive Order (EO) 12898 was signed in 1994 and requires Federal actions to identify and address
potentially disproportionately high and adverse human health or environmental impacts among minority
and low-income populations which may occur as part of the proposed project. EO 13985 was signed in
2021 and expanded in EO 12898 to consider not only minority and low-income populations, but assess
“equity with respect to race, ethnicity, religion, income, geography, gender identity, sexual orientation,
and disability.” The order also expanded to evaluate whether “underserved communities and their
members face systemic barriers in accessing benefits and opportunities available.”
2.0 Methodology
2.1 Limitations and Exceptions
There were several limitations and exceptions considered as part of this independent environmental
overview, which are described in more detail below. Lochmueller Group has applied generally accepted
professional practices and standards and exercised its professional judgment, skill, and care in a manner
consistent with that of other professionals performing similar work under similar conditions.
Page 142 of 157
May 3, 2024
Page 3
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
2.1.1 Independent Study
As part of the overall independent study, this document represents an overview that evaluates
reasonably foreseeable environmental implications associated with conceptual alternatives for possible
incorporation by the South Carolina Department of Transportation (SCDOT) into a larger recommended
preferred alternative for the William Hilton Parkway Gateway Corridor project along United States (U.S.)
Highway 278 within the town of Hilton Head Island, Beaufort County, South Carolina. This document
discusses conceptual layouts of alternatives, which would require further agency coordination, field
investigation, public involvement, and evaluation if advanced for adoption into the SCDOTs recommended
preferred alternative. This document does not replicate or replace the Environmental Assessment (EA)
prepared by the SCDOT. Additionally, this overview is not intended to serve as a NEPA document or even
comply with NEPA requirements either independently or in conjunction with SCDOTs project.
2.1.2 Desktop Review of Environmental Resources and Constraints
The environmental impacts are based on a preliminary desktop review of potential resources located
within the project area. Environmental resources were not field verified as part of this study. The
environmental resources identified during the desktop review were assumed to be present, and each
alternative evaluated potential impacts to those resources. These resources would need to be field
delineated and evaluated under the existing EA before an alternative could be pursued.
2.1.3 Coordination Efforts
This independent overview of potential environmental implications did not complete any agency,
stakeholder, or public involvement and outreach, which is a necessary component to the NEPA process. It
is expected that the necessary coordination with applicable agencies, stakeholders, and the public would
be undertaken by the SCDOT and their consultant as part of the NEPA evaluation for the William Hilton
Parkway Gateway Corridor project.
2.1.4 Noise Analysis
A noise analysis was not conducted for this independent overview of potential environmental
implications. Before an alternative could be pursued, a noise analysis would be required to determine the
impacts of each alternative to the surrounding communities and whether any noise mitigation measures
would be deemed necessary.
2.1.5 Reasonably Ascertainable, Publicly Available, and Practically Reviewable
Information
This independent overview of potential environmental implications associated with the William Hilton
Parkway Gateway Corridor Project was solely based on information that was publicly available, practically
reviewable, and reasonably ascertainable. That is, the content of this overview is based on records that
are feasibly retrieved for review, information that is readily available to the public upon request, and
obtainable from a source within a reasonable time and cost constraint. As of the date of this i ndependent
overview, information sought from the SCDOT regarding access to specific data relating to their
recommended preferred alternative (i.e., proposed right-of-way limits) and the resources identified
through technical environmental studies (i.e., delineated wetlands) was not furnished to Lochmueller
Group. While the absence of this information is unlikely to have affected the overall results of this
overview, it does present a limiting factor in the data provided herein.
Page 143 of 157
May 3, 2024
Page 4
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
2.2 Sources Reviewed
In association with the Federal Highway Administration (FHWA) and Beaufort County, the SCDOT
developed an Environmental Assessment (EA) to document the proposed U.S. Route 278 Corridor
Improvements (https://www.scdot278corridor.com/environmental-assessment). The EA was released in
June 2021 for public review and was reviewed as a part of this investigation. Information regarding
hazardous material sites was retrieved from the EPA Envirofacts website ( https://enviro.epa.gov/) and the
South Carolina Department of Health and Environmental Control website ( https://scdhec.gov/,
https://apps.dhec.sc.gov/Environment/USTRegistry). Information about the Honey Horn Plantation site
was found on the Hilton Head Island website (https://hiltonheadislandsc.gov/parks/HoneyHorn/).
In addition, several publicly available geographic information systems (GIS) were reviewed. The GIS
resources reviewed are summarized in the table below.
Table 1. GIS Resources Reviewed
Database Map Service Data Retrieved Link
Hilton Head Island Open Data Town-Owned Property
Dashboard & Property Viewer
Property data https://opendata.hiltonheadislandsc.
gov/
South Carolina Department of
Natural Resources (SDNR)’s
Geospatial Data
SCDNR Public Lands Map, South
Carolina Public Water Access, SC
Public Boat Ramps, Recreational
Shellfish Map Application, &
Shellfish Management Layers
Public View
Public Lands, public
water access, and state
shellfish grounds
https://data-
scdnr.opendata.arcgis.com/
National Oceanic and
Atmospheric Administration
(NOAA)’s GeoPlatform
Essential Fish Habitat Essential fish habitat https://noaa.maps.arcgis.com/home/
gallery.html?sortField=relevance&s
ortOrder=desc
U.S. Geological Survey (USGS)
National Hydrography Dataset
(NHD)
The National Map Downloader NHD lines https://www.usgs.gov/national-
hydrography/access-national-
hydrography-products
Federal Emergency
Management Agency (FEMA)’s
Flood Map Service Center
NFHL_45013C floodways https://msc.fema.gov/portal/home
SC Arch Site Subscriber View Map Cultural resources http://www.scarchsite.org/default.as
px
U.S. Fish and Wildlife Service
(USFWS) National Wetland
Inventory (NWI)
Wetlands Data Layer NWI wetlands
https://www.fws.gov/program/natio
nal-wetlands-inventory/wetlands-
data
Page 144 of 157
May 3, 2024
Page 5
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
3.0 Alternatives Analysis on Potentially Affected Resources
Four conceptual alternatives were evaluated as part of this overview. Publicly available GIS data was used
to evaluate potentially affected resources for each of the conceptual alternatives in an effort to identify
potential implications associated with each. These resources were separated into two categories: 1)
ecological and 2) community and social impacts (i.e., the human environment). Ecological resources
included NWI wetlands, streams, floodplains, essential fish habitat types, and threatened and enda ngered
species. Community and social impacts included relocations, right -of-way (ROW) acquisition, hazardous
materials sites, neighborhood impacts, environmental justice impacts, impacts to cultural resources, and
impacts to Section 4(f) resources. All alternatives identified result in some level of impact to identified
resources. However, some conceptual alternatives may result in a reduction of impacts to some resources
compared to the approved EA. The impacts discussed below are additional impacts anticipated as a result
of each conceptual alternative and are independent of quantities identified in SCDOTs Environmental
Assessment (EA). In order to be considered cumulative impacts, the quantities presented here must be
added to those of the recommended preferred alternative advanced by SCDOT in the EA for the project.
However, there are some extenuating issues associated with this in that resources identified in the EA
have been verified through field surveys, coordination with agencies, and/or through the results of public
engagement. Quantities presented in this overview are largely based on unverified resources unless
reasonably obtainable from the EA in combination with available GIS resources.
3.1 Alternative 1
Alternative 1 is the SCDOT Modified Recommended Preferred Alternative. Alternative 1 would require 0.2
acre of additional ROW. The additional ROW impacts are located within the Squire Pope neighborhood.
The additional ROW to be acquired is owned by the Town of Hilton Head. The SCDOT EA determined that
this area is an environmental justice community. One hazardous material site, Shell Food Mart Stati on 101
(165 William Hilton Parkway), is located near the alternatives. No impacts to the site are anticipated as a
result of Alternative 1. The SCDOT recommended preferred alternative was determined to have a “may
affect- not likely to adversely affect” finding for threatened and endangered species. Alternative 1 is not
anticipated to alter this finding. Coordination with the USFWS and the NOAA National Marine Fis heries
Service (NMFS) would need to occur to affirm this finding. Alternative 1 would not result in additional
impacts to NWI wetlands, streams, floodplains, or essential fish habitat types. No additional relocations
would occur as a result of Alternative 1. No additional impacts to cultural resources or Section 4(f)
properties would occur as a result of Alternative 1.
Page 145 of 157
May 3, 2024
Page 6
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
Table 2. Alternative 1 Additional Impact Summary
Resource/Category Units Impacts
Ecological NWI Wetlands Acres 0
Streams Linear Feet 0
Floodplains Acres 0
Essential Fish Habitat Types Acres 0
Threatened & Endangered Species Finding May Affect, Not Likely to Adversely Affect*
Community & Social
Hazardous Material Sites No. 0
Relocations No. 0
Right-of-Way Acres
No. of Tracts
0.2
1
Right-of-Way Owned by Town Acres
No. of Tracts
0.2
1
Neighborhoods No. 1 (Squire Pope)
Environmental Justice No. 1 (Squire Pope)
Cultural Resources No. 0
Section 4(f) Resources
(Hist. Properties/Public Recreational
Areas/Wildlife Refuges) No.
0
*Anticipated finding, pending coordination with USFWS and NOAA-NMFS
3.2 Alternative 2
Alternative 2 would involve the construction of bowties along both Squire Pope Road and Spanish Wells
Road/Wild Horse Road. Alternative 2 would require 1.10 acres of additional ROW. The Town of Hilton
Head owns 0.9 acre of the ROW that would need to be acquired. The additional ROW impacts are located
within the Stoney and Squire Pope neighborhoods. The SCDOT EA determined that the Stoney
neighborhood is an environmental justice community. The Squire Pope neighborhood was outside of the
SCDOT EA investigation area but is also a Gullah community. The Gullah people are the only African
American population in the US that have maintained a separate language and a distinct culture.
Therefore, Squire Pope is likely an environmental justice community. The SCDOT recommended
alternative was determined to have a “may affect- not likely to adversely affect” finding for threatened
and endangered species. Alternative 2 is not anticipated to alter this fin ding. Coordination with the
USFWS and the NOAA-NMFS would need to occur to affirm this finding. Alternative 2 would require
additional impacts to the Stoney Traditional Cultural Property (TCP). The SCDOT identified the Stoney
community as a TCP and as a resource eligible for inclusion in the National Register of Historic Places
(NRHP). As a NRHP-eligible resource, it is also considered a Section 4(f) property. Alternative 2 would not
result in additional impacts to hazardous materials sites, NWI wetlands, s treams, floodplains, or essential
fish habitat types. No additional relocations would occur as a result of Alternative 2.
Page 146 of 157
May 3, 2024
Page 7
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
Table 3. Alternative 2 Additional Impact Summary
Resource/Category Units Impacts
Ecological NWI Wetlands Acres 0
Streams Linear Feet 0
Floodplains Acres 0
Essential Fish Habitat Types Acres 0
Threatened & Endangered Species Finding May Affect, Not Likely to Adversely Affect*
Community & Social
Hazardous Material Sites No. 0
Relocations No. 0
Right-of-Way Acres
No. of Tracts
1.1
11
Right-of-Way Owned by Town Acres
No. of Tracts
0.9
8
Neighborhoods No. 2 (Stoney & Squire Pope)
Environmental Justice No. 2 (Stoney & Squire Pope)
Cultural Resources No. 1 (Stoney TCP)
Section 4(f) Resources
(Hist. Properties/Public Recreational
Areas/Wildlife Refuges) No.
1 (Stoney TCP)
*Anticipated finding, pending coordination with USFWS and NOAA-NMFS
3.3 Alternative 3
Alternative 3 would involve an echelon or center turn overpass at either Squire Pope Road or Spanish
Wells Road/Wild Horse Road intersection with William Hilton Parkway (US 278). The environmental
impacts for Alternative 3 were evaluated for an echelon at the Squire Pope Road intersection and an
echelon at the Spanish Wells Road/Wild Horse Road intersection. A center turn overpass would result in
more impacts than an echelon at either intersection. Therefore, a center turn overpass was dismissed
from further consideration.
An echelon at the Squire Pope intersection would require 1.0 acre of additional ROW. The Town of Hilton
Head owns 0.75 acre of the ROW that would need to be acquired. The additional ROW impacts are
located within the Stoney and Squire Pope neighborhoods. The SCDOT EA determined that the Stoney
neighborhood is an environmental justice community. The Squire Pope neighborhood is a Gullah
community and is likely an environmental justice community. The SCDOT recommended preferred
alternative was determined to have a “may affect- not likely to adversely affect” finding for threatened
and endangered species. An echelon at the Squire Pope intersection is not anticipated to alter this finding.
Coordination with the USFWS and the NOAA-NMFS would need to occur to affirm this finding. An echelon
at Squire Pope Road would result in additional impacts to the Stoney TCP, a cultural resource and Section
4(f) property. The addition of a grade separated intersection at Squire Pope Road also has the potential to
create visual barriers within the Stoney TCP. It would not result in additional impacts to hazardous
Page 147 of 157
May 3, 2024
Page 8
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
materials sites, NWI wetlands, streams, floodplains, or essential fish habitat types. No additional
relocations would occur as a result of Alternative 3.
Table 4. Alternative 3 (Echelon at Squire Pope Road) Additional Impact Summary
Resource/Category Units Impacts
Ecological NWI Wetlands Acres 0
Streams Linear Feet 0
Floodplains Acres 0
Essential Fish Habitat Types Acres 0
Threatened & Endangered Species Finding May Affect, Not Likely to Adversely Affect*
Community & Social
Hazardous Material Sites No. 0
Relocations No. 0
Right-of-Way Acres
No. of Tracts
1.0
12
Right-of-Way Owned by Town Acres
No. of Tracts
0.75
7
Neighborhoods No. 2 (Stoney & Squire Pope)
Environmental Justice No. 2 (Stoney & Squire Pope)
Cultural Resources No. 1 (Stoney TCP)
Section 4(f) Resources
(Hist. Properties/Public Recreational
Areas/Wildlife Refuges) No.
1 (Stoney TCP)
*Anticipated finding, pending coordination with USFWS and NOAA-NMFS
An echelon at the Spanish Wells Road/ Wild Horse Road intersection would require 1.1 acres of additional
ROW. The Town of Hilton Head owns 0.7 acre of the ROW that would need to be acquired. The additional
ROW impacts are located within the Stoney and Squire Pope neighborhoods. The SCDOT EA determined
that the Stoney neighborhood is an environmental justice community. The Squire Pope neighborhood is a
Gullah neighborhood and likely an environmental justice community. The SCDOT recommended preferred
alternative was determined to have a “may affect- not likely to adversely affect” finding for threatened
and endangered species. An echelon at the Spanish Wells Road intersection is not anticipated to alter this
finding. Coordination with the USFWS and the NOAA-NMFS would need to occur to affirm this finding. An
echelon at Spanish Wells Road would result in 0.29 acre of additional impacts to floodplains. It would
result in additional impacts to the Stoney TCP, a cultural resource and Section 4(f) property. It would also
result in 0.03 acre of additional impacts to the public park at 152 William Hilton Parkway, a Section 4(f)
property. The addition of a grade separated intersection at Spanish Wells Road / Wild Horse Road also has
the potential to create visual barriers within the Stoney TCP. An echelon at Spanish Wells Road would not
result in additional impacts to hazardous materials sites, NWI wetlands, streams, or essential fish habitat
types. No relocations would occur as a result of Alternative 3.
Page 148 of 157
May 3, 2024
Page 9
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
Table 5. Alternative 3 (Echelon at Spanish Wells Road/Wild Horse Road) Additional Impact Summary
Resource/Category Units Impacts
Ecological NWI Wetlands Acres 0
Streams Linear Feet 0
Floodplains Acres 0.3
Essential Fish Habitat Types Acres 0
Threatened & Endangered Species Finding May Affect, Not Likely to Adversely Affect*
Community & Social
Hazardous Material Sites No. 0
Relocations No. 0
Right-of-Way Acres
No. of Tracts
1.1
9
Right-of-Way Owned by Town Acres
No. of Tracts
0.7
5
Neighborhoods No. 2 (Stoney & Squire Pope)
Environmental Justice No. 2 (Stoney & Squire Pope)
Cultural Resources No. 1 (Stoney TCP)
Section 4(f) Resources
(Hist. Properties/Public Recreational
Areas/Wildlife Refuges) No.
2 (Stoney TCP & Park at 152 William Hilton
Parkway)
*Anticipated finding, pending coordination with USFWS and NOAA-NMF
3.4 Alternative 4
Alternative 4 would involve the construction of an elevated bypass lane generally within the center of the
existing William Hilton Parkway (US 278) roadway section (i.e., no additional widening of the mainline) .
Alternative 4 would impact an additional 0.03 acre of National Wetland Inventory (NWI) wetlands and an
additional 0.03 acre of essential fish habitats. Approximately 65 linear feet of Jarvis Creek would be
impacted. Alternative 4 would require no additional ROW. The SCDOT recommended preferred alternative
was determined to have a “may affect- not likely to adversely affect” finding for threatened and
endangered species. Alternative 4 is not anticipated to alter this finding. Coordination with the USFWS and
the NOAA-NMFS would need to occur to affirm this finding.
The Honey Horn Plantation is a collection of historic farm buildings and landscape and would be
considered a Section 4(f) resource. It is also home to the Coastal Discovery Museum, which educates the
public on the region’s cultural and natural history. Alternative 4 intersects the current boundary of Honey
Horn plantation according to the South Carolina Department of Archives and History website. This is
unlikely to be considered a Section 4(f) use as the proposed improvements associated with this alternati ve
would occur entirely within existing transportation ROW. Therefore, there is likely no conversion of the
resource from a non-transportation use to a transportation one. The current boundary of the site extends
into the existing footprint of U.S. 278. However, this part of the site has likely been disturbed by previous
construction. Further investigation and coordination with the applicable agencies would be needed to
determine the exact cultural and Section 4(f) impacts to this site. No additional relocations would be
required. The addition of an elevated bypass lane on a combination of fill or structure also has the
Page 149 of 157
May 3, 2024
Page 10
3502 Woodview Trace, Suite 150
I
ndianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
potential to create visual barriers within the Stoney TCP. However, this alternative would not result in
additional encroachment on the Stoney TCP and, as such, is not quantified as a direct impact in the table
below. No additional impacts to hazardous materials sites, neighborhoods, or environmental justice
communities are anticipated. No impacts to floodplains are anticipated.
Table 6. Alternative 4 Additional Impact Summary
Resource/Category Units Impacts
Ecological
NWI Wetlands Acres 0.03
Streams Linear Feet 65
Floodplains Acres 0
Essential Fish Habitat Acres 0.03
Threatened & Endangered Species Finding May Affect, Not Likely to Adversely Affect*
Hazardous Material Sites No. 0
Community & Social
Relocations No. 0
Right-of-Way Acres
No. of Tracts
0
0
Neighborhoods No. 0
Environmental Justice No. 0
Cultural Resources No. 1 (Honey Horn Plantation)
Section 4(f) Resources
(Hist. Properties/Public Recreational
Areas/Wildlife Refuges)
0 No.
*Anticipated finding, pending coordination with USFWS and NOAA-NMFS
Page 150 of 157
May 3, 2024
Page 11
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
3.5 Summary
An overall summary of the environmental impacts for each of the alternatives can be seen in Table 7 :
Table 7. Additional Environmental Impacts Summary
Resource/Category Units Alternative 1 Alternative 2 Alternative 3
(Echelon at
Squire Pope)
Alternative 3
(Echelon at
Spanish
Wells)
Alternative 4
NWI Wetlands Acres 0 0 0 0 0.03
Streams Linear Feet 0 0 0 0 65
Floodplains Acres 0 0 0 0.29 0
Essential Fish Habitat Acres 0 0 0 0 0.03
Threatened & Endangered
Species
Finding May Affect,
Not Likely to
Adversely
Affect*
May Affect,
Not Likely to
Adversely
Affect*
May Affect,
Not Likely to
Adversely
Affect*
May Affect,
Not Likely to
Adversely
Affect*
May Affect,
Not Likely to
Adversely
Affect*
Hazardous Material Sites No. 0 0 0 0 0
Relocations No. 0 0 0 0 0
Right-of Way Acres
No. of Tracts
0.2
1
1.1
11
1.0
12
1.1
9
0
0
Right-of-Way Owned by
Town
Acres
No. of Tracts
0.2
1
0.9
8
0.75
7
0.7
5
0
0
Neighborhoods No. 1 (Squire Pope) 2 (Stoney &
Squire Pope)
2 (Stoney &
Squire Pope)
2 (Stoney &
Squire Pope)
0
Environmental Justice No. 1 (Squire Pope) 2 (Stoney &
Squire Pope)
2 (Stoney &
Squire Pope)
2 (Stoney &
Squire Pope)
0
Cultural Resources No. 0 1 (Stoney
TCP)
1 (Stoney
TCP)
1 (Stoney
TCP)
1 (Honey
Horn
Plantation)
Section 4(f) Resources No. 0 1 (Stoney
TCP)
1 (Stoney
TCP)
2 (Stoney
TCP & Park
at 152
William
Hilton
Parkway)
0
*Anticipated finding, pending coordination with USFWS and NOAA-NMFS
Page 151 of 157
May 3, 2024
Page 12
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
Each environmental impact was ranked in order from least impactful (1) to most impactful (4) across the
four different alternatives. The total of these rankings was calculated for each alternative and this was
used to rank the alternatives from least impactful (1) to most impactful (4).
Table 8. Additional Environmental Impacts- Alternatives Ranking
Resource/Category Alternative 1 Alternative 2 Alternative 3 Alternative 4
NWI Wetlands 1 1 1 4
Streams 1 1 1 4
Floodplains 1 1 4 1
Essential Fish Habitat 1 1 1 4
Threatened &
Endangered Species
1 1 1 1
Hazardous Material
Sites
1 1 1 1
Relocations 1 1 1 1
Right-of-Way 2 4 4 1
Neighborhoods 2 4 4 1
Environmental Justice 2 4 4 1
Cultural Resources 1 4 4 4
Section 4(f) Resources 1 3 4 1
Total 15 26 30 24
Rank 1 3 4 2
4.0 Risk Assessment
The largest risk for implementing any alternative beyond those identified within the existing NEPA
document is the additional time required to complete field investigations of new areas added, coordinate
with appropriate regulatory agencies, and complete additional community outreach and engagement
opportunities. Therefore, the project schedule would be delayed in order to complete these activities. In
addition to time, there will be an added cost to complete these activities and update the existing NEPA
document.
Alternatives 1 and 2 are not anticipated to change the cultural resources or Section 4(f) findings compared
to the existing EA. However, additional outreach may be necessary within the Stoney and Squire Pope
communities. Alternatives 3 and 4 may elevate the cultural resources finding from a No Adverse Effect
(NAE) to Adverse Effect (AE) finding due to additional impacts to the Stoney Traditional Cultural Property
(TCP). Additional Section 106 investigations and documentation would be required to determine i f this
Page 152 of 157
May 3, 2024
Page 13
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
finding would be elevated or not. Alternatives 3 and 4 have additional involvement with Section 4(f)
resources, which is not anticipated to be a “use.” However, additional evaluation and concurrence with
appropriate agencies would be required for any changes to impacts to Section 4(f) resources. The specific
risks associated with each alternative are summarized in Table 9.
Page 153 of 157
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
Table 9: Summary of Risk Considerations for Each Alternative
Resource/Category Type Alt. 1: Risk Considerations Alt. 2: Risk Considerations Alt. 3: Risk Considerations Alt. 4: Risk Considerations
Ecological
Wetlands, Streams,
Floodplains,
Threatened &
Endangered Species
Additional time will be necessary for field investigations of new areas added and coordination with the appropriate regulatory agencies.
Permits Since no impacts to wetlands, streams, or floodplains are anticipated,
no water resource permits are anticipated.
Water resource permits are
anticipated due to impacts to the
floodplain.
Water resource permits are
anticipated due to impacts to
wetlands, streams, and essential fish
habitat.
Community & Social
Relocations None
Right-of-Way Risks same as noted in ecological. None
Neighborhoods New impacts to Squire Pope
community
Additional impacts within Stoney
and new impacts to Squire Pope
community. Turning limitations will
bring additional traffic into
neighborhood at bowtie locations.
Additional impacts within Stoney
and new impacts to Squire Pope
community. Echelons within Stoney
creates potential barriers.
While no additional ROW acquired,
the elevated bypass lane within
Stoney creates a potential barrier
dividing community.
All impacts to neighborhoods require additional outreach and engagement opportunities to inform the public of project updates.
Environmental Justice Risks are the same as noted in the neighborhoods section.
Cultural Resources Current Section 106 finding is
“Adverse Effect” for impacts
to archaeological site 38BU66;
no change in finding is
expected. Additional project
elements at Gum Tree may
require consideration of
Squire Pope as a TCP.
Current Section 106 finding is
“Adverse Effect” for impacts to
archaeological site 38BU66;
additional ROW from Stoney; no
change in finding is expected.
Additional project elements at Gum
Tree may require consideration of
Squire Pope as a TCP.
Additional ROW from Stoney and
elevated project elements creates
visual effects, which may elevate
Stoney TCP from NAE to AE finding
and require a MOA amendment.
Additional project elements at Gum
Tree may require consideration of
Squire Pope as a TCP.
Elevated project elements within
Stoney TCP create visual effects,
which may elevate Stoney TCP from
NAE to AE finding and require a MOA
amendment. New impacts to Honey
Horn Plantation require
consideration.
Section 4(f) Resources No change expected to
current 4(f) findings in EA.
Potential for Squire Pope to be
considered a TCP. ROW
required unlikely to be
considered a conversion
(“use”).
No change expected to current 4(f)
findings in EA. Potential for Squire
Pope to be considered a TCP. ROW
required unlikely to be considered a
conversion (“use”).
Additional “use” at Stoney & park at
152 WHP; likely AE at Stoney TCP
may require additional 4(f)
evaluations. Potential for Squire
Pope to be considered a TCP. ROW
required unlikely to be considered a
conversion (“use”).
Likely AE at Stoney TCP, when added
to impacts identified in EA, may
require additional 4(f) evaluations.
Project elements within Honey Horn
Plantation unlikely to be considered
a conversion (“use”).
Page 154 of 157
3502 Woodview Trace, Suite 150
Indianapolis, Indiana 46268
PHONE: 317.222.3878 • TOLL FREE: 800.423.7422
5.0 Conceptual Mitigation Strategies
For alternatives where impacts to ecological resources such as wetlands, streams, and floodplains are
unavoidable, mitigation would be determined during the permitting phase of the project and in context
with the overall project impacts. For alternatives where impacts to Section 106, Section 4(f), and the local
communities are unavoidable, mitigation may become necessary.
Based on the risks associated with Alternative 1, additional mitigation considerations are unlikely to be
required. Alternative 2 is unlikely to require mitigation for Section 106 and Section 4(f) impacts . However,
mitigation measures such as traffic calming measures, inclusion of Gullah art in bowties, or the creation of
a unique gateway may be necessary to address any community impacts. Alternatives 3 and 4 have higher
associated risk and impacts to the surrounding communities. Mitigation strategies could include a variety
of different approaches focusing on the Gullah community. This may include interpretive signage,
incorporation of community art, a walking tour pamphlet, or a video documentary about the Gullah.
Additionally, elements would focus on encouraging connectivity of the community on either side of U.S.
278. The specific risk level and mitigation strategies associated with each alternative are summarized in
Table 10.
Table 10: Summary of Environmental Risk Levels and Potential Mitigation Strategies
Alternative
Risk Categories
(related to cost and schedule implications to the NEPA
process)
Section 106 (Cultural
Resources)
Section 4(f) Community &
Social Impacts
Alt. 1 –
Mod. SCDOT Rec.
Preferred Alt.
Risk
Considerations
Moderate Low Low
Mitigation Unlikely additional mitigation considerations would be
required for this alternative.
Alt. 2 –
Bowties at Squire
Pope and Spanish
Wells
Risk
Considerations
Moderate Moderate Moderate
Mitigation Mitigation for Section 106 and Section 4(f) unlikely.
Community impacts may require mitigation. Concepts could
include traffic calming measures, inclusion of Gullah art in
bowties, or creation of unique gateway.
Alt. 3 –
Echelon/Center
Turn Overpass
Risk
Considerations
High High Moderate
Mitigation Interpretive signage about Gullah community along trails.
Incorporation of Gullah art into the transportation
infrastructure (crosswalks, wall murals, lighting, asphalt
painting, sculptures). Walking tour pamphlet or video
documentary about the Gullah. Include design elements that
encourage connectivity of community on either side of U.S.
278 and traffic calming on intersecting roadways. Evaluate
context sensitive design opportunities.
Alt. 4 –
Elevated Bypass
Risk
Considerations
High High High
Mitigation Same as Alternative 3.
Page 155 of 157
0 1,000500
Feet ´ Created: 5/3/2024, SBeaupre
Ecological Resources Map
Jarvis Creek
278
278
Greens Shell
Park
Old Elementary
School Park
Jarvis Creek
278
Gum
tree
Rd
Marsh Point Dr
Bus Dr
Marshside Dr
W
ild
Horse
Rd
School Rd
Cross Island Pkwy
William Hilton Pkwy
Jarvis Creek
Community Park
Honey Horn
Hilton Head
Island
Spanish
W
ells
Rd
Jarvis Creek
Community Park
Honey Horn
Jarvis Creek
E2EM1N
E1UBL
E2EM1P
PUBHx
PFO1R
E2USP
PFO1S
PFO1C
E2USM
PEM1C
PEM1/SS1R
PEM1/SS4Cd
E2US2/EM1P
PFO1/4C
E2US2P
PFO1F
PEM1Cx
PEM1Fx
E2USN
PUBHh
PFO1A
E2SS3/1P
R5UBH
E2EM1/USP
E2EM1/USN
3502 Woodview Trace, Suite 150
Indianapolis, IN 46268
Phone: (317) 222-3880
Fax: (317) 222-3881
Source(s): Maxar, Esri Community Maps
Contributors, Town of Hilton Head Island,
SC, Esri, TomTom, Garmin, SafeGraph,
GeoTechnologies, Inc, METI/NASA,
USGS, EPA, NPS, US Census Bureau,
USDA, USFWS
County: Beaufort
City: Hilton Head Island
State: South Carolina
Legend
Alternatives 1, 2, & 3 Conceptual ROW
Alternative 2 Conceptual ROW
Alternative 3 (Squire Pope Echelon) Conceptual ROW
Alternative 3 (Spanish Wells Echelon) Conceptual ROW
Alternative 4 Conceptual Footprint
Streams
Wetland Type
Estuarine and Marine Deepwater
Estuarine and Marine Wetland
Freshwater Emergent Wetland
Freshwater Forested/Shrub Wetland
Freshwater Pond
Lake
Other
Riverine
Flood Zone
1% Annual Flood Hazard
Floodway
Minimal Flood Hazard
Squire Pope Road
Wild Horse Road
Spanish Wells Road
Gum Tree Road
Page 156 of 157
0 1,000500
Feet ´ Created: 4/24/2024, SBeaupre
Community Resources Map
Jarvis Creek
278
278
Greens Shell
Park
Old Elementary
School Park
Jarvis Creek
278
Gum
tree
Rd
Marsh Point Dr
Bus Dr
Marshside Dr
W
ild
Horse
Rd
School Rd
Cross Island Pkwy
William Hilton Pkwy
Jarvis Creek
Community Park
Honey Horn
Hilton Head
Island
Spanish
W
ells
Rd
Jarvis Creek
Community Park
Honey Horn
3502 Woodview Trace, Suite 150
Indianapolis, IN 46268
Phone: (317) 222-3880
Fax: (317) 222-3881
Source(s): Maxar, Esri Community Maps
Contributors, Town of Hilton Head Island,
SC, Esri, TomTom, Garmin, SafeGraph,
GeoTechnologies, Inc, METI/NASA,
USGS, EPA, NPS, US Census Bureau,
USDA, USFWS
County: Beaufort
City: Hilton Head Island
State: South Carolina
Legend
Alternatives 1, 2, & 3 Conceptual ROW
Alternative 2 Conceptual ROW
Alternative 3 (Squire Pope Echelon) Conceptual ROW
Alternative 3 (Spanish Wells Echelon) Conceptual ROW
Alternative 4 Conceptual Footprint
Long Pathway Route
Public Pathway
EJ Populations
Parks & Recreational Areas
Potential Hazardous Materials Sites
State Shellfish Grounds
NRHP-Eligible Properties
Neighborhood
Stoney
Traditional
Cultural
Property
Shell Food
Mart
Squire Pope
Community
Public Park at
152 William
Hilton Parkway Honey Horn
Plantation
Jarvis Creek
Park
Squire Pope Road
Wild Horse Road
Gum Tree Road
Spanish Wells Road
Page 157 of 157