Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 1
Town of Hilton Head Island
WILLIAM HILTON PARKWAY GATEWAY
CORRIDOR INDEPENDENT REVIEW
ADVISORY COMMITTEE MEETING
Wednesday, May 8, 2024, 1:00 PM
Minutes
1. Call to Order
Mayor Perry called the meeting to order at 1:00 PM. Present were: Mayor Alan Perry,
Chairman; Diederik Advocaat; Edward C. Warner, Jr.; and Willie Young. Absent were: Charles
P. Walczak and Henry Ford, Alternate.
2. Approval of the Minutes
a. Regular Meeting Minutes of April 10, 2024
Mr. Warner made a motion to approve the minutes as presented, at which time Mr.
Advocaat asked that a sentence on Page 3 describing a discussion with the consultant
concerning a 4-lane bridge in the minutes of the April 10, 2024 meeting be struck. Mayor
Perry asked for a review of the recording to provide more clarification, so the Motion by
Mr. Warner was amended to approve the minutes with the following condition: that the
recording be reviewed and the sentence in question be clarified. The motion was
seconded by Mr. Advocaat and unanimously adopted.
b. Special Meeting Minutes of April 22, 2024
Mr. Warner made a motion to approve the minutes as presented, at which time Mr.
Advocaat questioned whether the Committee had approved Mr. Colin moving forward
with a meeting with Beaufort County and SCDOT concerning the Alternatives as stated in
the minutes of the April 22, 2024 meeting. Mayor Perry asked for a review of the
recording to provide more clarification, so the Motion by Mr. Warner was amended to
approve the minutes with the following condition: that the recording be reviewed and the
question of approval be clarified. The motion was seconded by Mr. Advocaat and
unanimously adopted.
3. Unfinished Business
a. Update on Project Progress
Shawn Colin, Assistant Town Manager - Community Development, noted that Mr. Nohren
and his team would be going through a more in-depth evaluation, but he presented a brief
review of the scope of work and progress made. In addition, he would share the
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 2
responses on the Alternatives received from SCDOT at the Committee's request, as well
as SCDOT responses to bridge rehab vs. new bridge, and safety information.
He pointed out that the authorizing resolution for this Committee was to perform 4 key
functions, 3 of which have been completed, with the 4th to move through the scope of
work to make sure it is executed in accordance with the scope that the Committee and
Town Council had adopted, and that is now in progress.
b. Update on Committee Requests
At the last meeting, the Committee requested that there be an evaluation of Alternatives
that were developed independently by Lochmueller, as well as the proposed Alternative
called the Express Bypass, and labeled Bypass 3.1.
Mr. Colin reported that in accordance with the request from the Committee, a trip was
made to Columbia last Wednesday. Alternatives #1, #2, #3, and #4 that were identified in
the Lochmueller presentation, both on April 10 and April 22, were shared with the South
Carolina Department of Transportation (SCDOT) in advance of the trip. The other
Alternative not recommended by Lochmueller, but recommended for submission to
SCDOT for response was the Bypasss 3.1 that has been discussed for some time. After
review, feedback from SCDOT regarding Alternatives was provided at the meeting. They
also provided some information related to the bridge rehab vs. a reconstruction or new
bridge, and did a thorough review of the Alternatives to provide technical evaluation and
feedback related to feasibility or viability of the Alternatives to advance.
Mr. Advocaat questioned why all the Alternatives are being discussed with SCDOT when
the Committee is still reviewing these. Mr. Colin explained he was working under the
unanimous direction of the Committee to have these Alternatives vetted and to provide
feedback. Mayor Perry and Mr. Advocaat disagreed on what had been agreed by the
Committee to seek from the SCDOT and also the role of individual committee members
who discuss matters outside the meeting, which may be construed as representing the
Committee as a whole.
Mr. Colin reiterated that the direction supported by the Committee was to have the
Alternatives vetted and request a response from SCDOT, but there was no direction on
the method used to obtain that information, therefore a meeting was held in Columbia at
which the feedback requested was obtained. He reported the general feedback was
technical in nature related to project implications for costs, implication to the
Environmental Assessment (EA) and timing, implications to funding, and then also,
feasibility to advance through Federal Highway Administration. As a result of the
discussion held on May 1, the SCDOT drafted a response letter, which was officially
submitted by their Deputy Secretary of Transportation and Chief Engineer. A copy of the
letter dated May 2, 2024, from the SCDOT was received after the agenda packet had
been published to the public, however, a copy of that letter is attached to the Minutes and
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 3
made a part hereof, and a copy was provided to all Committee members.
Mr. Colin reviewed in detail the comments from the SCDOT letter that were specific to
each Alternative. He noted that Alternatives #2, #3, and #4 are very low on feasibility or
viability to be able to advance based upon the National Environmental Policy Act (NEPA)
process and to get these through Federal Highways with minimizing impacts. These were
the 3 Lochmueller Alternatives.
Questions concerning whether SCDOT provided a breakdown of the $425M cost estimate
and the size bridge this encompassed were addressed by Mr. Colin. He indicated the cost
estimate is based upon the configuration that is included in the EA, with the project being
a 6-lane bridge, with a barrier between eastbound and westbound traffic, including 2-10'
shoulders, one in each direction operating as breakdown lanes, with 6' shoulders on the
interior, having been reduced from 10' shoulders. It includes a 12' bike and pedestrian
pathway along the bridge. He indicated those are the elements that are included, with
mitigation also included that is the original mitigation that the SCDOT and County had
worked on, but in his opinion may not be enough. Mr. Colin indicated he had not
requested detailed breakdown of every line item in the $425M estimate for this project,
especially since no Alternative has yet been selected, and he suggested that at this point
it would be beneficial to look at the comparative assessment between Alternatives to
understand what the approximate cost of each might be. As the EA progressed, he noted
that cost was not a factor in the initial assessment done to vet Alternatives, but instead
was brought in as a secondary criteria, along with other items, as you work through the
NEPA process. He noted there is still an element remaining that is required by the NEPA
process, and that is a value engineering. Once an Alternative is selected, there is an
advance made through Federal Highways and there is a value engineering that must be
done to identify where there may be additional cost-savings for the project.
Mr. Colin identified those attending the meeting in Columbia from the Town as being:
Mayor Perry, Town Manager Marc Orlando, Councilman Alex Brown, Shawn Colin, and
Thomas Boxley, Chairman of the Community Development Corporation. From the
County, those attending were: John Robinson, Interim Administrator, Joe Passiment,
Chairman of Beaufort County Council, and Jared Fralix, PE, Assistant County
Administrator-Infrastructure. Mr. Advocaat noted for the record that he considered the trip
premature and suggested another trip be made after the Committee's evaluation. Mayor
Perry noted Mr. Advocaat's concerns. A question concerning reducing the width of the 3
lanes was answered by Mr. Colin, who indicatied that had been suggested in a previous
conversation with SCDOT several years ago, and the response was concerns about the
volume and speed associated with the bridge, and about freight traffic requiring a 12' foot
lane width. Simply re-striping to accommodate 3-lanes on the existing bridges would not
provide a breakdown lane. The SCDOT suggested that the County with Town support
could submit a design exception that they could possibly support to reduce on Jenkins
Island the 2 interior lanes in each direction to 11', but 12' lanes on the outer lanes should
be maintained for freight traffic.
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 4
A motion was made by Mr. Advocaat that the Committee fully consider the horizontal
bypass, and he would like Lochmueller to include in full detail in their evaluatoin. Mr.
Young seconded the motion. Mayor Perry noted this could be done for discussion, but if it
involves an increase in cost, then it must go back to Town Council for approval. Mr.
Advocaat indicated he had been given a proxy from Mr. Walczak, who had indicated his
approval. Mayor Perry noted that Mr. Walczak had given no notice of his proxy. Mayor
Perry indicated while the Committee had not yet been given the Lochmueller
presentation, he was unclear whether this would be beneficial at this point. Discussion
followed concerning the viability of considering this prior to the Lochmueller presentation
and the SCDOT response as to their findings. Mr. Colin offered to provide information to
help make an educated vote, and he requested that Mr. Nohren and any member of the
Lochmueller team to provide their opinion on this alternative from an engineering
standpoint and state whether or not they believe it is a feasible alternative to advance. In
response to Mr. Advocaat's request for an immediate vote, Mayor Perry called for a vote.
The motion passed 3-2, with Mr. Advocaat, Mr. Young, and Mr. Advocaat voting by proxy
on behalf of Mr. Walczak in favor. Those opposed were Mayor Perry and Mr. Warner.
Mr. Colin noted the Express Bypass 3.1 that was most recently submitted was provided to
SCDOT for their input and feedback and accessment on viability for advancement. Due
to the significant amount of impact to the Stoney Community, they thought this would
trigger a full Environmental Impact Statement (EIS), and would increase significantly the
environmental impacts. See full SCDOT comments in Letter dated May 2, 2024, as noted
before and attached to the minutes.
Mr. Colin noted that Alternatives #2, #3 and #4 were given very low feasibility to advance,
and there are statements from SCDOT that they would be eliminated, as is the case with
the Express Bypass that was presented. What was submitted to SCDOT was exactly the
same as what was submitted to the Town for consideration, and this is the response from
SCDOT. They do not believe that the Express Bypass is a viable option on many counts,
including property impact, environmental impact, cost, timeframe, and would not advance
this. Federal Highways would likely reject this option if submitted due to the additional
TCP impact, as it would be counter to their objectives of avoiding or minimizing property
impacts and mitigating, in that order. He asked for Mr. Nohren's professional engineering
opinion on the feasibility of this alternative advancing.
Mr. Nohren indicated that would be a part of his presentation later on the Agenda.
Although it was not included in the scope of services, Lochmueller experts, Loren and
Chad, and from traffic perspective it was also considered, and Lochmueller's would be
provided.
Mr. Advocaat expressed concern about the independent consultant being privy to the
indepth conversations that have taken place with SCDOT and their findings. Mr. Nohren
advised that the information developed by Lochmueller was completed before seeing the
SCDOT document that was emailed to him today, and today's presentation would be their
independent viewpoints on the Bypass.
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 5
Mr. Colin reiterated that he could not modify the scope of work just at the direction of this
Committee, as the scope was approved by Town Council. The Committee's charge was
to work with the consultant to move forward consistent with the scope of work they
created. Before a contract amendment could be executed to evaluate this alternative,
Town Council approval would be needed.
Mr. Colin continued with his presentation of the Alternatives which the Committee asked
be vetted through SCDOT, as there have been some questions related to a bridge rehab
vs. a new bridge, SCDOT was asked about the design cost and construction implications
related to bridge rehabilitation vs. new bridge. He noted the existing bridge is approaching
70 years in its lifecycle and is nearing the end of the design lifecycle of 70-75 years set by
SCDOT. Their response was that bridge rehabilitation could be performed, but their
preference is for a new bridge. Mr. Colin also showed a slide of a Heat Map and Collision
Data outlining a significant amount of traffic incidents or collisions from 2016 to 2024
through the bridge corridor section and also as you approach the Stoney Community. The
detailed response from SCDOT, Heat Map, and Collision Data are all shown on the slides
presented by Mr. Colin and included in the agenda packet. These were presented to
provide reasons for advancing a project to put in place a mechanism to provide
improvements in this area, including reducing speeds, traffic calming, and providing a
safer transportation system through this area. He reviewed the Town Council Authorized
Scope of Work, which included an independent study by a consultant to review all the
assumptions, methodologies, and come up with what they believed for alternatives to
advance for this project. They were encouraged to develop their own ideas and
recommend their own alternatives, which in Mr. Colins's opinion has been done. The
proposed plans have to pass NEPA review, and any additional impacts, including safety
and other items that are considered by Federal Highway. He noted that wha Lochmueller
has done is look at the alternatives and viability and ability for them to move through the
NEPA process and have alternatives that are supported by Federal Highway. The
anticipation for completion was set at 6 months. He briefly reviewed the Tasks, noting
those completed, ongoing, provided by staff, or in progress.
c. Presentation of Findings - SCDOT Seismic Study Review
Mr. Nohren noted the members of the Lochmueller team joining the meeting remotely -
Kate, Michelle, Chad, and Loren and new team members, Jason Hickle, structural
department manager who helped perform the analysis of existing bridge data, and Shawn
Dykes, in-house transit expert, who provided input on the Memorandum regarding the
feasibility of trying to maintain 4-lanes west of Squire Pope. Mr. Nohren began his
presentation, which is included in the agenda packet, and included an outline of the
completion data for Tasks #1, #2, #3, #4 and #5, with an overall completion progress of
80%. Mr. Advocaat asked to see the live modeling of the area Hilton Head Plantation to
Moss Creek, and Mr. Nohren indicated that is a part of Task #4, with VISSIM and
Synchro modeling included for the entire study area. Mr. Nohren moved into Task 1.8,
which is the SCDOT Seismic Study Review Findings, which was approved by the
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 6
Committee and Town Council. He explained this was a review only of the SCDOT
approved US 278 Bridge Seismic Study, approximately 1800 pages in total, dated April
2020, which was received by Lochmueller on April 15, 2024. The focus for Lochmueller
was on the detailed Life Cycle Cost Analysis (LCCA) to provide their input. He reviewed
the 3 options considered, rehabilitation and seismic retrofits or construction of a new 6-
lane structure similar to the SCDOT Preferred Alternative.
d. Presentation of Finding - Technical Report
Detailed review findings and key observations for Options 1, 2 and 3 can be found in the
presentation included in the agenda packet. In summary, Mr. Nohrens stated Lochmueller
does not recommend rehabilitation and/or retrofit options be pursued. Questions from
Committee members were addressed by the Lochmueller team.
Michelle Romine, Lochmueller team member, attending the meeting remotely, continued
with the 4-Lane Viability Technical Memo (Task 1.3.3). She stated the objective was to
perform a cursory, high-level review to determine if one or more select strategies [second
bridge, modifications to the existing mass transit system, implementation of a new ferry
system, or implementation of a facility usage fee (congestion pricing)] could be
implemented to allow for a 4-lane section of William Hilton Parkway between Moss Creek
and Squire Pope Road, as included in the Agenda Packet. She outlined the various
methods used to arrive at the concluding opinion by Lochmueller that these strategies
should not be considered as viable alternatives to be used individually and/or collectively
to solely address traffic congestion and mobility related concerns along US 278 within the
project study area, to allow a four-lane section to be maintained along US 278 within the
study area. Questions from Committee members were addressed by Ms. Romine.
e. Review of Overall Evaluation Matrix for 4 Alternatives
Mr. Nohren noted that at the April 22, 2024, meeting, a request was made for a
delineation between public and private parcels. With additional information provided by
the Town's GIS staff, Lochmueller used that data to determine if that impacted their
findings. He pointed out that for Alternative #3, the acreage changed from the April 22
acreage of 1.4, and with the new information, the figure has been reduced to 1.1 acres,
which also changes the rankings of the Alternatives. A discussion ensued with Mr.
Advocaat reiterating his opposition to the way the rankings were determined, and the
Lochmueller team noting that ultimately it was providing the Committee with the
information needed to make the final decision and differentiate between the Alternatives
through a high level evaluation. However, if desired, they offered to amend the matrix to
remove the last 2 rows for scoring and ranking purposes. Mr. Colin noted the scope of
work asked for the consultant to determine a way to evaluate, but did not specify exactly
how that was to be accomplished. Elements were added that needed to be included in
the evaluation, and questions could be made about the conclusions and findings that they
have made or presented, but the goal of this Committee is to make sure the project is
being executed against that scope of work. When you ask for an independent review
based on engineering to provide you with information, this has been done according to
the scope of work. You can disagree with some of their conclusions, but not the
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 7
methodology. Mr. Advocaat continued to voice his opinion that it was wrong to draw
conclusions on the numbers and the Lochmueller team noted this practice has been
applied across other projects throughout the country, but it should be considered just
another way of screening.
Mr. Colin noted that the first 3 Tasks have been completed to move through the
independent review of all Alternatives, including any additional Alternatives Lochmueller
thought worthy to advance. He reported that feedback has been obtained from SCDOT at
the Committee's direction, and there is an Alternative that is preferred from the SCDOT's
feedback, and there are additional design modifications that could be considered to
reduce the right of way impacts, further reducing the impact to the TCP and the Stoney
Community. He stated that Lochmueller needs to evaluate the downstream impacts to
complete the next few Tasks in the scope of work, so the final informationcan be included
in a delivered report. He has asked Lochmueller to move forward with Alternative #1 with
design modifications to consider based on the feedback received from SCDOT on the
Alternatives, so this could be built into their modeling for VISSIM to fully understand the
downstream impacts.
Mr. Colin reminded the Committee that the current Preferred Alternative that the County
has recommended as part of the EA document, results in 3.4 acres of total impact to the
TCP, with1.12 acres being privately owned property. The current design as you come on-
Island includes 2 left turn lanes from William Hilton Parkway eastbound onto Squire Pope
Road, with a design modification being evaluated by SCDOT from a performance and
right of way impact standpoint, to reduce those 2 left turn lanes eastbound to 1 left turn
lane onto Squire Pope Road. Also, there are currently 2 right turn lanes proposed as you
come southbound on Squire Pope Road and right turn onto William Hilton Parkway
westbound going off-Island. There has been a design modification request made to
SCDOT from the Town and the County to reduce those 2 right turn lanes to 1 right turn
lane, again further reducing the right of way impact on the Squire Pope and William Hilton
Parkway segment. The third modification is that going westbound off-Island, there is a
dedicated left turn only lane that accesses the Crazy Crab Restaurant. There has been a
design modification request to shift that westbound and have that turn lane serve all of
the driveway points on the southern side. The SCDOT has committed to evaluate those
design considerations to see if the right of way and cross-section would be reduced for
the roadway need, and therefore reduce the property impacts that is in the EA proposals
for the current project. We believe there will be significant reductions if those design
modifications are supported, and understanding the relationship between the
transportation corridor land use and the performance of the roadway are all
considerations. One of the primary goals of Federal Highways is social justice and social
impact, so they are significantly interested in alternatives that reduce the impact as much
as possible. That is why the other Alternatives that were shared with the SCDOT were
unlikely to be feasible from their standpoint. Those are the design modifications that we
have requested from SCDOT and are included in the Alternative #1 to move the modeling
for the next phase of the project forward at this time.
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 8
Comments and questions were posed by Committee members. Mr. Advocaat reiterated
his opinion that this is still premature without finishing the study and looking at the new
Alternative being put forth today. Mr. Warner questioned how firm the SCDOT is in their
comments, and whether there might be a hesitation on their part. Mr. Colin reported they
were not interested at all in advancing Alternative #4, and as mentioned before, money is
a consideration, and whether there is another viable solution that minimizes the overall
impact and is less expensive. They will consider some additional elements, but the
position that has been conveyed to the Town and the County consistently is that those
additional costs would have to be borne at the local level. He reported that when talks
began about alternatives, they let us know they were not in favor of Alternative #4 with an
elevated bypass, but they are willing to understand design modifications proposed from
local input in the project.
f. Observations Related to Southern "Bypass" Alternative
Ms. Romine continued by noting that although not contained within their scope,
Lochmueller did look at the Southern Bypass. She provided a cursory traffic overview, Mr.
Jackson provided a cursory engineering overview, and Mr. Costa provided a cursory
environmental overview, which are all included in the Agenda Packet. Mr. Advocaat
stated his opinion that the critical element is traffic lights that basically stop traffic coming
onto Hilton Head Island, and the horizontal bypass which circumvents the traffic lights,
should be considered due to less impact on the wetlands and deserves a good look.
Concerns were expressed about impact on the wetlands, timing of construction, traffic
capacity and signals, and other issues by the Committee members. The Lockmueller
team reiterated their opinion that there is no other alignment that could be done that will
not have similar or more impacts as what has already been shared with the Committee.
Mr. Costa stated that although he could not speak for the Federal Highway
Administration, but based on his experience, his professional opinion is that the horizontal
bypass would be a difficult project for them to approve. Mr. Colin noted that what he has
heard from SCDOT concerning the southern bypass is that it has a very, very small
chance, if any, of advancing through the process. Timing of integration of the Windmill
Harbour and Moss Creek lights into the adaptive signal system was also discussed. Mr.
Advocaat pointed out the Southern Bypass would remove traffic from the regular US 278,
and it could be made a toll road if the Town chooses to do so, and would then be a
significant source of income.
4. Appearance by Citizens
Public comments concerning agenda items were to be submitted electronically via the Open
Town Hall Portal. No comments were received through the Portal, and no requests were
received to appear before the Committee regarding non-agenda items. Several citizens
appeared before the Committee and provided comments.
Christopher Cliffe commented that the SCDOT letter was quite explicit, with the Preferred
Alternative being the only solution in their view, with no comments about the Lochmueller
proposal, so it would appear they are making it quite clear that they are only prepared to
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 9
consider their option. He asked about a time constraint possible on the life span of the EA
documents. He mentioned that Craig Winn had made it quite clear that the deficiencies in the
McKay bridge had been provided for at a figure of $40M, but the seismic study numbers
revealed today, there is no comparison, and questioned where the $40M figure came from. He
also mentioned that Craig Winn had made it clear that Jenkins Island was not an accident hot
spot, but the 6 fatalities shown on accident data presented today all involved DUI, so including
accident data in SCDOT's Preferred Alternative is slightly misleading. The 6-lanes being
pushed by everyone only pushes congestion further down the road, and the SCDOT
Alternative is not a solution at all.
Mr. Baer congratulated the job being done by the Committee to rationalize that the SCDOT
plan is the one and only true plan with the studies based on a few key principles of staying in
SCDOT's footprint and questioned who authorized this. Secondly, he suggested they have
ignored proving the congestion problem has been solved. He questioned where is the stress
test if you get more than expected, which he predicted would be 4,000 vehicles per hour and
the plan was unproven and would not actually work, and the data has not been presented to
support the plan. He noted there is no value being placed on Gullah Geechee land that is
being taken, and questions from citizens are being ducked with no answers provided, and
called the study the most unscientic study he has ever seen.
Gray Smith commented on time saved eastbound and westbound reported by Lochmueller,
using percentages that make it look worse. Today, the eastbound AM in 2045 would be 7
minutes longer if nothing was done, and westbound coming out would be 5 minutes longer
and questioned the $500M being spent for this. He questioned the SCDOT rejection of all
Alternatives except their own, and erred at the beginning of this project by ending it at Spanish
Wells Road rather than include the adjacent major roadways that are integral to the project,
namely Spanish Wells Road and Gumtree Road, which they say cannot be considered as part
of the project without greatly extending the time of construction. He commented that as a 12-
year Hilton Head Island resident, he is being asked to accept an inferior product at the
outrageous cost of $500M, and he finds this totally unacceptable and asked the Committee to
do the same.
Louise Cohen, a native of Hilton Head Island, noted she is a member of the 5th generation of
her family. She reminded the Committee members that as they serve and make decisions for
other people, they should have a heart and understand how much the highway would affect
the community they live in and that was established by their ancestors as their inheritance.
Their homes mean as much to them as yours means to you, and she urged them to care
about destroying a community, their heritage, and their culture.
Richard Busy expressed his surprise that the beaurocrats in Columbia, the SCDOT, liked their
plan the best. He noted they don't live here - we live here. He noted that due to the vote today,
he would await an impartial and independent by the consultants on the Horizontal Bypass
Plan. However, Mr, Colin has indicated Town Council will need to approve that, and he
questioned whether this was just another obstacle, as this was first time any discussion has
been held on the Horizontal
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 10
Bypass Plan - a plan which connects directly to the Cross Island Parkway, uses almost no
private land, is less than half the price of your Plan #4. He pointed out that more than 50% of
the traffic coming onto the Island are bound for the Cross Island Parkway, and yet none of the
plans, including the State plan, provide a direct link to the Parkway. He could not understand
how an 11-lane, aircraft carrier slab, a/k/a the bridges, is in keeping with preserving the
character of Hilton Head Island.
Richard Ritter, a member of the Executive Committee of the new Hilton Head-Bluffton branch
of the NAAPP, noted they are in the process of drafting and submitting to the Town a letter
expressing the concerns of the NAACP about all of the traffic proposals discussed today. The
letter must be approved by the membership and then submitted to the State Conference of the
NAACP for review and approval, so he could not discuss it in detail. He expected to have the
letter ready to be sent to the Mayor within the next 2 weeks. Obviously, the concerns
expressed will be about the impact of the plans on the Stoney and Gullah Geechee
Community as a whole. He questioned whether it was true that Alternative #1 would have no
adverse impact, as they know it will because there are homes on both sides of US 278, as well
as business properties, that will be impacted. He noted the Stoney Community is 1 of 14
historic designated communities on Hilton Head Island, putting them in a special place, and
his concern is to make sure the interests of this historic neighborhood are being fully
accounted for and there are no alternatives that can be discussed and put in place.
Sherry Sherman, President of the NAACP, commented she was new to the Island and wanted
the Committee to keep in mind that the Gullah Geechee live here and are impacted by the
decisions made by the Committee.
Trey Graves, born and raised on Hilton Head Island, empathized with the Committee over its
complex and difficult decision to be made as to how to solve the traffic congestion problem. He
pointed out that 90% of the people in the room would not be sitting in that traffic in 2045, but
he probably would be. Although the alternative is radical that was proposed decades ago to
put another bridge off the Island, not in the same footprint of the Graves Bridge, but
somewhere at the end of Beach City Road that could connect to St. Helena Island that would
provide 2 entrances and exits onto the Island, act as a great circle to keep traffic moving, and
make it easier for the working people coming from Ridgeland and Hardeeville who sit in 4
pinch points before even reaching the bridge. He acknowledged it would be expensive, would
have to be a toll bridge, take extensive engineering, would affect the beauty of the Island, but
it is not a problem or solution that the majority of the people affected today and making the
decisions today will have to deal with when we are your age.
Mr. Colin addressed Mr. Cliffe's question about the life span of the EA by explaining that
projects that go through the NEPA process, whether it is an EIS or Environmental
Assessment, the information the findings and conclusions are based on has a 3-year life span.
So, that expires, then you have to amend or update the information, or potentially go through
the entire process again. He indicated the end date for EA is the end of June, 2026.
5. New Business
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
5/8/2024 Page | 11
None.
6. Adjournment
Mayor Perry declared the meeting adjourned at 3:41 PM.
Approved: June 12, 2024