RecordWell Data

William Hilton Parkway Gateway Corridor IRAC - Special Meeting — Agenda Packet

Town of Hilton Head Island · Beaufort County · General · meeting of Apr 22, 2024 · Agenda packets

Open the original document More from Town of Hilton Head Island

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory Committee Meeting Monday, April 22, 2024, 1:00 PM 1 Town Center Court, Hilton Head Island, SC Benjamin M. Racusin Council Chambers The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County Channel, and Spectrum Channel 1304. 1. Call to Order 2. Approval of the Minutes a. Meeting Minutes of April 10, 2024 will be approved at the next regular meeting. 3. Unfinished Business a. Additional Details on Property Impacts, Cost, and Construction Period for Alternatives. 4. Appearance by Citizens 5. New Business 6. Adjournment FOIA Compliance: Public notification of this meeting has been published, posted, and distributed in compliance with the South Carolina Freedom of Information Act and the requirements of the Town of Hilton Head Island. In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities. Auditory accommodations are available. Any person requiring further accommodation should contact the Town of Hilton Head Island ADA Coordinator as soon as possible but no later than 48 hours before the scheduled event. Municipal Association of South Carolina (MASC) Civility Pledge: Page 1 of 24 “I pledge to build a stronger and more prosperous community by advocating for civil engagement, respecting others and their viewpoints, and finding solutions for the betterment of my city or town.” Page 2 of 24 Stephen G. Riley Municipal Complex One Town Center Court  Hilton Head Island  South Carolina  29928 www.hiltonheadislandsc.gov TOWN OF HILTON HEAD ISLAND Willliam Hilton Parkway Gateway Corridor Advisory Committee TO: Advisory Committee FROM: Shawn Colin DATE: April 22, 2024 SUBJECT: Transmittal of Meeting Materials from the Lochmueller Group Agenda RECOMMENDATION: This memo serves as the transmittal document to cover the materials submitted for consideration by the Lochmueller Group. This material will be covered at the April 22, 2024 meeting of the William Hilton Parkway Gateway Corridor Advisory Committee. ATTACHMENTS: 1. The Lochmueller Group Document Transmittal Memo – dated April 18, 2024 2. Presentation by the Lochmueller Group – dated April 22, 2024 Page 3 of 24 TRANSMITTAL To: Shawn Colin, AICP – Town of Hilton Head Island From: Nate Nohren, PE, PTOE Date: April 18, 2024 Subject: Copy of Power Point Presentation for 4/22/2024 Advisory Committee Meeting RE: William Hilton Parkway Gateway Corridor Indepen dent Review Hi Shawn, Attached please find a PDF copy of the power point slides we will be presenting at the April 10, 2024, Advisory Committee meeting. The content provided w ithin our presentation can be summarized as follows: • Brief Review of Alternatives and Areas Where ROW Req uired – we will provide slides showing Lochmueller’s four proposed Alternatives being cons idered, as well as estimated areas where additional ROW (beyond that which will be required for SCDOT’s preferred alternative) would be required to implement each of Lochmueller’s four pr oposed Alternatives. Note that our intent is to simply allow these slides to serve as a reminder of what was discussed at the 3/27 and 4/10 Committee meetings, and not spend an appreciable am ount of time on any of these slides during the presentation. • Updated ROW, Cost, and Construction Duration Informa tion – an action item from the 4/10 meeting was to have Lochmueller delineate how much public vs. private ROW would be required for each Alternative, as well as provide high-level, order of magnitude estimates of cost and duration of construction. We’ve inserted this info rmation into an updated results matrix that speaks to these topics. • Updated Overall Scoring Matrix for All Alternatives – we will present our updated overall scoring matrix, which considers all key contributin g factors associated with this project, and provides a ranking of the four Alternatives. Please let me know if you have any questions regard ing the information shared above. Otherwise, we look forward to speaking with you all on April 22. Sincerely, Nate Nohren, PE, PTOE Page 4 of 24 William Hilton Parkway Gateway Corridor Independent Review Advisory Committee Meeting April 22 nd , 2024 Page 5 of 24 Agenda  Brief Review of Alternatives and Areas Where ROW is Required  Updated ROW, Cost, and Construction Duration Information  Updated Overall Scoring Matrix for All Alternatives Page 6 of 24 Alternative #1 – SCDOT Modified Recommended Preferred Page 7 of 24 Alternative #2 – Bowties at Squire Pope and Spanish Wells Page 8 of 24 Alternative #3 – Echelon / Center Turn Overpass Echelon Center-Turn Overpass Page 9 of 24 Alternative #4 – Elevated Bypass Page 10 of 24 Alternative #4 – Elevated Bypass Page 11 of 24 Alternative #4 – Elevated Bypass Page 12 of 24 Alternative #4 – Elevated Bypass Page 13 of 24 Alternative #4 – Elevated Bypass (Squire Pope) Page 14 of 24 Alternative #4 – Elevated Bypass (Spanish Wells) Page 15 of 24 Alternative #4 – Elevated Bypass (Gumtree) Page 16 of 24 Travel Time Comparison Scenario Difference in Travel Time (seconds)* when Compared to 2045 No Build % Difference AM PM AM PM 2045 Alternative 1: SCDOT Modified Recommended Preferred EB -109 +18 -16.1% 2.7% WB +43 -276 6.3% -34.2% 2045 Alternative 2: Bowties at Squire Pope and Spanish Wells EB -104 -39 -15.3% -6.6% WB +9 -290 1.4% -36.4% 2045 Alternative 3: Echelon at Squire Pope EB -67 -51 -9.4% -8.9% WB +17 -297 2.5% -37.7% 2045 Alternative 3: Echelon at Spanish Wells EB -103 +16 -15.1% 2.5% WB -15 -331 -2.3% -44.0% 2045 Alternative 3: Center Turn Overpass at Squire Pope EB -122 +23 -18.4% 3.5% WB -21 -319 -3.3% -41.6% 2045 Alternative 3: Center Turn Overpass at Spanish Wells EB -134 -17 -20.6% -2.9% WB -16 -339 -2.5% -45.4% 2045 Alternative 4: Elevated Bypass (at grade intersections only**) EB -126 +27 -19.1% 4.1% WB +4 -330 0.5% -43.7% Travel times were completed in Synchro for the Hilton Parkway corridor between Moss Creek and Indigo Run * ** Denoted travel times reflect operations of at-grade intersections only. VISSIM software will allow for modeling of bypass itself, and will therefore yield greater reductions in travel times than those shown in the table for the corridor as a whole. Page 17 of 24 Additional ROW Req’d vs SCDOT Alternative Alternative #1 –SCDOT Modified Preferred Page 18 of 24 Additional ROW Req’d vs SCDOT Alternative Alternative #2 - Bowties Page 19 of 24 Additional ROW Req’d vs SCDOT Alternative Alternative #3 - Echelons Page 20 of 24 Additional ROW Req’d vs SCDOT Alternative Alternative #3 - Center Turn Overpass Page 21 of 24 Right of Way and Cost Matrix – Data & Scoring Resource/Category Alternative 1 (Mod. SCDOT Recommended Preferred) Alternative 2 (Bowties at Squire Pope and Spanish Wells) Alternative 3 (Echelon / Center Turn Overpass) Alternative 4 (Elevated Bypass) Est. Add’l Right of Way Acres – Public Est. Add’l Right of Way Acres – Private TOTAL Add’ Right of Way Acres 0.2 0.0 0.2 0.94 0.16 1.10 0.86 0.54 1.40 0 Right of Way Score 2 3 4 1 Estimated Cost $426M* $430M** $440M to $450M** $545M to $575M** Cost Score 1 2 3 4 Estimated Construction Duration 36 months 38 months 42 months 48 months Construction Duration Score 1 2 3 4 TOTAL 4 7 10 9 RANK 1 2 4 3 Denoted estimated cost provided by Beaufort County ($425M) + proposed Gum Tree improvements recommended by Lochmueller ($1M) * ** Denoted estimated cost generated by Lochmueller Gro up; based upon assumed percent differential in cost, in comparison to Alternative 1 Page 22 of 24 Overall Scoring Matrix 1 = Highest Ranking Resource/Category Alternative 1 (Mod. SCDOT Recommended Preferred) Alternative 2 (Bowties at Squire Pope and Spanish Wells) Alternative 3 (Echelon / Center Turn Overpass) Alternative 4 (Elevated Bypass) Traffic Operations (Throughput and Traffic Simulations) 4 3 3 1 ROW Impact 2 3 4 1 Environmental Impact 1 2 4 3 Safety 4 3 3 1 Bike/Pedestrian Impact 4 3 1 2 Community and Social Impact 1 3 4 2 Aesthetic 2 1 3 4 Cost 1 2 3 4 Construction Duration 1 2 3 4 TOTAL 20 22 28 22 RANK 1 3 4 3 Page 23 of 24 QUESTIONS? https://www.islandpacket.com/news/local/traffic/article235209867.html Page 24 of 24

Source: Town of Hilton Head Island website. First collected Nov 20, 2026.