Town of Hilton Head Island
Planning Commission Meeting
Wednesday, April 3, 2024, 2:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Pledge to the Flag
3. Adoption of the Agenda
4. Approval of the Minutes
a. Regular Meeting Minutes of March 20, 2024 will be approved at the April 17,
2024 meeting.
5. Appearance by Citizens
6. Unfinished Business
7. New Business
a. Capital Improvement Program Fiscal Year 2025 Priority Projects
8. Commission Business
9. Chairman's Report
10. Staff Reports
11. Adjournment
FOIA Compliance: Public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
Page 1 of 10
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 2 of 10
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Planning Commission
TO: Planning Commission
FROM: Bryan McIlwee, PE, Director of Public Projects & Facilities
VIA: Shawn Colin, AICP, Assistant Town Manager – Community
Development
CC: Marc Orlando, Town Manager
CC: Jeff Herriman, Interim Finance Director
DATE: April 4, 2024
SUBJECT: Capital Improvement Program Fiscal Year 2025 Priority Projects
RECOMMENDATION:
The Planning Commission recommend a list of proposed priority projects to Town Council
for consideration as part of their Capital Improvements Program for Fiscal Year 2025
(FY25).
BACKGROUND:
The Parks and Recreation Commission met on March 14, 2024 and voted unanimously
to recommend the list of projects to the Planning Commission with the following condition:
South Forest Beach Drive pathway project along the south side of the road from
Marriott Grande Ocean to Coligny Beach Park be included in the FY2025 budget.
The Planning Commission’s recommendations will be provided to Town Council prior to
their budget deliberations, which are tentatively scheduled to occur in May 2024.
SUMMARY:
The State’s enabling legislation assigns the Planning Commission the duty to prepare “an
annual listing of priority projects for consideration by the Town Council prior to their
preparation of the capital budget.” A list of proposed priority projects for FY25 has been
prepared for consideration based on the status of FY24 projects, input of the Parks and
Recreation Commission (PRC), Bike Walk HHI, and staff.
ATTACHMENTS:
1. Draft FY25 Proposed Priority Projects
Page 3 of 10
TOWN OF HILTON HEAD ISLAND - CAPITAL IMPROVEMENTS PROGRAM FY25 PRIORITY LIST
PROJECTS PROJECT SCOPE STATUS STAFF
PRIORITY
PC
PRIORITY
TC
PRIORITY
BEACH PROGRAM
Beach Management & Monitoring
Ongoing activities to manage the beach including Islandwide beach
survey and monitoring, endangered species monitoring, Beach Program
Economic Sustainability Analysis, etc.
FY24 CARRY
FORWARD
Beach Renourishment
Activities related to Beach Renourishment Project, including permitting,
bidding, and construction. Construction of next cycle of renourishment
anticipated to begin in April, 2025. Pine Island, Fish Haul Creek, and Heel
must be complete by August, 2025 to achieve Fish & WIldlife Permit
requirements. Renourishment of remaining island beaches in FY26. FEMA
funds must be reimbursed by December, 2025.
FY24 CARRY
FORWARD
Beach Park Maintenance & Improvements
Maintenance and general improvements to 7 beach parks such as
paving, landscaping, lighting, and site furnishings, etc.
FY25 - Upgrades to Recycling, Trash, Wayfinding, Rules, Signage, Lighting
FY25
Islanders Beach Park Improvements Construction of Islanders Park Renovation pending coordination with
Beach Renourishment staging area
FY24 CARRY
FORWARD
Coligny Beach Park Boardwalk Improvements to existing decking and substructure
Proposed in FY25 move to FY26 FY26-29
Driessen Beach Park Improvements
Future enhancements to vehicular/pedestrian circulation including
accessibility, improved beach access, new site furnishings/lighting,
playground, landscape enhancements
FY26-29
Fish Haul Beach Park Improvements
Future enhancements to vehicular/pedestrian circulation including
accessibility, improved beach access, new site furnishings/lighting,
playground, landscape enhancements
FY26-29
Beach Wheelchair Storage Permanent storage structure for increased beach wheelchairs stemming
from Chamber Leadership Class project; 5 locations ($19,800 each) FY25
Harbour Town Dredge
Agreement with South Island Dredging Association to assist with funding
for dredging of Harbour Town Yacht Basin and Braddock Cove Creek;
Funding approved in FY19, 20, and 21 budgets
FY24 CARRY
FORWARD N/A
TOTAL BEACH PROGRAM
PATHWAY PROGRAM
Pathway Maintenance & Improvements
Maintenance and Improvements to existing pathways including repair,
rejuvenation, and striping plus safety enhancements aimed at improving
consistency and uniformity of all pathways, including ADA compliance.
May include Preliminary Planning, Design (Conceptual & Final),
Permitting, and/or Construction depending on specific project. Includes
assessment/repair of all pathway boardwalks and pathway fence
replacement.
FY25
William Hilton Parkway EB (Mathews Drive/Folly
Field Road to Shelter Cove Lane)
Design, Permitting, and Easement Acquisition of pathway from Shelter
Cove Lane (at BCSO) to Singleton Beach Rd. Construction in FY26.
Future phase (Singleton Beach Rd to Mathews Dr/Folly Field Rd) to be
considered with Corridors Implementation.
FY24 CARRY
FORWARD
Jonesville Road Finalize Design, Permitting, & Easement Acquisition of +/- 1.2 miles of
pathway along Jonesville Road. Begin construction of pathway in FY25.
FY24 CARRY
FORWARD
William Hilton Parkway EB (Wexford to Arrow Road) Final Design, Permitting, and begin Easement Acquisition of pathway
from Village at Wexford to Arrow Road. Constructio anticipated in FY26.
FY24 CARRY
FORWARD
William Hilton Parkway EB (Port Royal Plaza to
Mathews Drive/Folly Field Road)
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of +/- 1 mile of pathway from
Folly Field Road to Port Royal Plaza
FY26-29
William Hilton Parkway at Sea Pines Circle
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of pathway around perimeter of
Sea Pines Circle
FY26-29
William Hilton Parkway EB (Gum Tree Road to
Gardner Drive)
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of pathway from Gardner Drive
to Gum Tree Road
FY26-29
William Hilton Parkway EB (Squire Pope Road to
Gum Tree Road)
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of pathway from Gum Tree Road
to Squire Pope Road
FY26-29
William Hilton Parkway WB (Bridge to Jenkins Road
to Squire Pope Road)
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of pathway from Bridge to Squire
Pope Road
FY26-29
Dunnagans Alley (Wexford Drive to Arrow Road)
Final Design, Permitting, and begin Easement Acquisition for streetscape
improvements from Wexford Drive to Arrow Road. Construction
anticipated in FY27.
FY24 CARRY
FORWARD
Cross Island Parkway (Coastal Discovery Museum
Access) to Spanish Wells Road
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of pathway from Cross Island
Parkway access to Spanish Wells Road
FY26-29
NEW PATHWAY SEGMENTS
FY24 Accomplish and FY25 CIP Budget.xlsx Page 1 03/29 /2024
Page 4 of 10
TOWN OF HILTON HEAD ISLAND - CAPITAL IMPROVEMENTS PROGRAM FY25 PRIORITY LIST
PROJECTS PROJECT SCOPE STATUS STAFF
PRIORITY
PC
PRIORITY
TC
PRIORITY
Shelter Cove Towne Centre to Shelter Cove
Marina
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of +/- 2000 LF of pathway from
Shelter Cove Marina to Shelter Cove Community Park
FY26-29
South Forest Beach (from HAWK Signal to Marriott
Hotel)
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of pathway on South Forest
Beach Drive
FY26-29
Lagoon Road (Avocet Road to North Forest Beach
Drive)
Future Preliminary Planning, Design (Conceptual & Final), Permitting,
Easement Acquisition, and Construction of pathway on Lagoon Road FY26-29
Cordillo Parkway at Pope Avenue Construction of pathway connection from Pope Avenue to Shipyard
along Cordillo Parkway.
FY24 CARRY
FORWARD
TOTAL PATHWAY PROGRAM
ROADWAY PROGRAM
DIRT ROAD ACQUISITION & PAVING PROGRAM
Mitchelville Lane Final Permitting & Construction of +/- 1300 LF paved road, pending 100%
ROW Acquisition.
FY24 CARRY
FORWARD
Pine Field Road Construction in FY26 pending 100% ROW Acquisition FY 24 CARRY
FORWARD
Horse Sugar Lane & Alice Perry Drive Design (Final), Permitting, & Construction of +/- 925 LF of paved road,
pending 100% ROW Acquisition.
FY24 CARRY
FORWARD
Freddie's Way Design (Final), Permitting, & Construction of +/-900 LF paved road,
pending 100% ROW Acquisition.
FY24 CARRY
FORWARD
Alfred Lane
Preliminary Planning, Design (Conceptual & Final), & Permitting +/- 900 LF
of paved road. Construction anticipated for FY26 pending 100% ROW
Acquisition.
FY24 CARRY
FORWARD
Aranda's Way
Preliminary Planning, Design (Conceptual & Final), & Permitting +/- 350 LF
of paved road, pending 100% ROW Acquisition. Construction planned for
FY26.
FY26-29
Christopher Drive
Preliminary Planning, Design (Conceptual & Final), & Permitting +/- 950 LF
of paved road, pending 100% ROW Acquisition. Construction planned for
FY26.
FY26-29
Darling Road
Preliminary Planning, Design (Conceptual & Final), & Permitting +/- 550 LF
of paved road, pending 100% ROW Acquisition. Construction planned for
FY26.
FY26-29
Manatee Way
Preliminary Planning, Design (Conceptual & Final), & Permitting +/- 850 LF
of paved road, pending 100% ROW Acquisition. Construction planned for
FY26.
FY26-29
Benjamin Drive Survey, Planning, Design, Permitting, and ROW acquisition in FY25.
Construction anticipated in FY26 pending 100% ROW Acquisition. FY25
Other Dirt Roads To Be Determined Future paving of e xisting dirt roads FY26-29
WILLIAM HILTON PARKWAY ENHANCEMENTS
Improvements to William Hilton Parkway from Sea Pines Circle to Spanish
Wells Road (SCDOT Gateway project) targeting safety, beautification
and consistency to include landscaping, signage, pavement markings,
curbing etc.
FY24 CARRY
FORWARD
William Hilton Parkway Gateway Corridor & Stoney
Corridor
Additional planning for improvements to William Hil ton Parkway on
recommendations not included in SCDOT project
FY24 CARRY
FORWARD
Islandwide Intersection Improvements
Striping, Wayfinding, Safety Signage
Pedestrian and Vehicular Enhancements
Installation of consistent and uniform signs, pavem ent markings, lighting,
landscaping, and related traffic signs, etc. for 26 intersections based on
Corridors Plan. Striping, signage, midblock crossing, lighting, etc.
Island wide branding and style design guide based on recommendations
from Corridor Study Project will identify new design standards, materials,
implementation, etc.
FY24 CARRY
FORWARD
Wilborn Rd, Pembroke Dr, Drive Turn Lane
Extensions / Curb and Gutter
Design and permitting of extended turn lanes to alleviate vehicle
stacking and prevent rutting and driving into the medians at William
Hilton Parkway intersections with Wilborn Rd, Pembroke Dr, Construction
anticipated in FY26.
FY24 CARRY
FORWARD
Dillon Road at William Hilton Parkway - Right Turn
Lane
Right Turn lane from Dillon Road onto William Hilto n Parkway
Project has existed with no budget, Design in FY26, Construction in FY26 &
FY27
FY26-29
Pope Avenue Streetscape Enhancements Implementation of recommendations from the Corridors Planning project FY24 CARRY
FORWARD
Palmetto Bay Road Streetscape Enhancements
Future streetscape improvements to Palmetto Bay Road Corridor from
Cross Island Parkway to Sea Pines Circle including landscaping,
pathways, signage, etc.
FY26-29
Arrow Road Streetscape Enhancements Future streetscape improvements to Arrow Road including landscaping,
pathways, signage, etc. FY26-29
New Orleans Road Streetscape Enhancements Future streetscape improvements to New Orleans Road including
landscaping, pathways, signage, etc. FY26-29
Program to accept dedications of private, unpaved roads to become public rights of way and then pave the roads and
install storm drainage infrastructure.
POPE AVE., PALMETTO BAY ROAD, ARROW ROAD, & NEW ORLEANS ROAD STREETSCAPE ENHANCEMENTS
FY24 Accomplish and FY25 CIP Budget.xlsx Page 2 03/29 /2024
Page 5 of 10
TOWN OF HILTON HEAD ISLAND - CAPITAL IMPROVEMENTS PROGRAM FY25 PRIORITY LIST
PROJECTS PROJECT SCOPE STATUS STAFF
PRIORITY
PC
PRIORITY
TC
PRIORITY
Main Street Enhancements
Design (Final) & Permitting of improvements to Main Street from
Whooping Crane to Wilborn Road including side streets (Museum Street,
Central Avenue, and Merchant Street and North Main Street from
Whooping Crane to Hospital Center Boulevard including roadway,
pathways, streetscape, and drainage improvements. Construction
planned for multiple fiscal years. Construction of a new roundabout at
Wilborn Road and a new roundabout at Hospital Center Boulevard
planned for future fiscal years.
FY24 CARRY
FORWARD
Roadway Maintenance & Improvements
Maintenance of and Improvements to existing roadways including
general maintenance such as repair of potholes, curbing, and shoulders;
pavement markings; permanent traffic signs; etc.
FY25
Adaptive Signal System Maintenance
Ongoing and recurring maintenance of traffic signal system and
maintenance of traffic mast arms and signage ($230,000);
Reimbursement by SCDOT through IGA. Painting of mast arms at all 26
locations at $25,000 per intersection ($650,000 )
FY25
Marshland Road (Mathews Drive to Leg O' Mutton) Future streetscape improvements from the Mathews-Marshland Round-a-
bout to Leg O' Mutton FY26-29
Fish Haul Road/Baygall Road Corridor
Future streetscape improvements to include traffic calming, landscaping,
pathways, signage, etc. Project to be coordinated with Barker Field Park
Master Plan.
FY26-29
Bow Circle Connectivity FY26-29
Corridors Segment 1 - Spanish Wells to Gumtree Road FY26-29
Corridors Segment 2 - Gumtree Road to Beach City
Road; Main Street
See Main Street Detail above; future improvements of Segment 2 in future
fiscal years FY25
Corridors Segment 3 - Beach City Road to Dillon Road Design (Final), Permitting & Construction of improvements including
lighting, crosswalk markings, and signage to enhance pedestrian safety. FY25
Corridors Segment 4 - Dillon Road to Folly
Field/Mathews Drive FY26-29
Corridors Segment 5 - Mathews to Shelter Cove Lane Design of potential improvements identified by the Town and SCDOT. FY25
Corridors Segment 6 - Shelter Cove Lane to Arrow Road Deisgn, permitting and construction of potential improvements identified
by the Town and SCDOT. FY26-29
Corridors Segment 7 - Palmetto Bay Road, Arrow Road
and New Orleans Road
Deisgn, permitting and construction of potential improvements identified
by the Town and SCDOT. FY26-29
Corridors Segment 8 - Sea Pines Circle, Pope Avenue,
Coligny Circle, and portions of NFB/SFB
Deisgn, permitting and construction of potential improvements identified
by the Town and SCDOT. FY25
Landscape, Lighting, and Safety Enhancements
Beach City Road roundabout, Pope Avenue, WHP, Mathews Drive,
Dunnagans roundabout, Squire Pope Roundabout, Palmetto Bay Road,
Cross Island Parkway
FY25
TOTAL ROADWAY PROGRAM
PARK PROGRAM
Mid-Island Tract Park Deign (Final) and Permitting of phase 1 of new community park
underway. Construction of Phase 1 starting in FY25.
FY24 CARRY
FORWARD
Chaplin Community Park Renovation Renovation of existing Community Park. Design (Final) and permitting in
FY25. Phase construction of park improvements over several fiscal years
FY24 CARRY
FORWARD
Crossings Park Renovation including Bristol Sports
Arena
Renovation of existing Community Park
Design, permitting, and construction of 12 pickleball court complex on
Arrow Road ($3.3M); Design and permitting of park improvements;
Construction of Skate Park ($650k-900k) & Pump Track ($350k-600k) and
park amenities);
Resurface Roller Hockey/Basketball venue including paint inside Rink
panels and kickboards, install 64 new exterior rink panels, install 4 72"
glass Basketball backboard system, Sand and paint existing Posts ($108k);
Design, permitting of all-weather court structure
FY24 CARRY
FORWARD
Shelter Cove Community Park Expansion Phase 2 expansion of existing Community Park; Design (Final) and
permitting in FY25 with construction in FY26
FY24 CARRY
FORWARD
Chaplin Linear Park with Treehouse
Design (Conceptual & Final) and Permitting of Phase 1 of Linear Park
including trail head up-fit, pedestrian bridge at Broad Creek inlet, tree
house, and marsh-side trail connection to Singleton Beach Road
FY24 CARRY
FORWARD
Patterson Family Park Construction for new Neighborh ood Park in FY25 FY24 CARRY
FORWARD
Taylor Family Park Construction for new Neighborhood Park in FY25 FY24 CARRY
FORWARD
PARKS & RECREATION
FY24 Accomplish and FY25 CIP Budget.xlsx Page 3 03/29 /2024
Page 6 of 10
TOWN OF HILTON HEAD ISLAND - CAPITAL IMPROVEMENTS PROGRAM FY25 PRIORITY LIST
PROJECTS PROJECT SCOPE STATUS STAFF
PRIORITY
PC
PRIORITY
TC
PRIORITY
Barker Field including Barker Field Extension
Improvements to Barker Field Extension including fencing, new lights,
bleachers, player benches, swings; Design (Final), Permitting and
Construction in FY25. Design (Conceptual) for newly acquired Barker
Field Master Plan. Construction in future fiscal years.
FY24 CARRY
FORWARD
Ford Shell Ring CDBG project; Design and permitting for improvements to supplement
Beaufort's County's construction project
FY24 CARRY
FORWARD
FY25 Coligny Circle Quadrant Pocket Park (Pope
Ave enhancements)
Improvements to include plaza amenity space, signage, landscaping,
muli-use path. Design and permitting in FY24. Construction in FY25. FY25
Rec Center Building Enhancements Recreation center enhancements FY25
Rec Center Pool Enhancements Pool enhancements including dome equipment and pool equipment
updates, windscreens, locker replacment, pool covers, etc. FY25
Parks/Event Enhancements Athletic fields and event parks improvements FY25
Outdoor Recreation Basketball court improvements; backboards, sun shade, light
replacement, court replacement FY25
Public Art Program
Sculptures for installation at Shelter Cove Sculpture Trail (3) – Dana
Montlack
Site prep at Sculpture Trail (preparing for installation, replace shell at
pathway
Replacement signs for Public Art collection 20@ $135 each
Deposit for 2025 Sculpture Trail installation of Seward Johnson pieces
Upkeep/maintenance/repair of permanent collection and sites
FY24 CARRY
FORWARD
GENERAL PARK ENHANCEMENTS
Includes various identified facility and service improvements at existing
parks including restroom partition replacement, restroom floor re-tiling,
restroom building roof replacement, etc.
FY25
Jarvis Creek Park Enhancements ADA accessibility improvements, site and landscape enhancements FY25
Greens Shell Park Enhancements Replacement of property line fencing, curb, playground equipment, and
observation decks
FY24 CARRY
FORWARD
Old Schoolhouse Park Enhancements
Landscape & site improvements: ADA parking and sidewalks, restroom,
shade, signage, seating, basketball court resurface, landscaping, etc. FY24 CARRY
FORWARD
Rowing & Sailing Center Park Enhancements New in FY25 - Upgrades TBD FY25
TOTAL PARK PROGRAM
FACILITIES AND EQUIPMENT PROGRAM
Town Hall Facility Enhancements Installation of upgrades to building including stru ctural and flooring
repairs, painting, sprinkler heads, carpet, etc. FY25
Shelter Cove/BCSO Office Building Storage enhancemen ts FY24 CARRY
FORWARD
Fire Rescue Headquarters/Dispatch Center/EOC (New
Facility) Future construction of new facility FY26-29
Fire Rescue Training Center Facility Upgrades Upgrad es to Classroom and Phase 1of Burn Building FY24 CARRY
FORWARD
Facilities Maintenance Building Mezzanine Future add ition of mezzanine in bay and garage areas for storage FY26-29
Light Fixture upgrades at all Fire Stations, Fire Rescue
HQ, and Training Center Update all CFL fixtures to LED FY26-29
Wild Wing Café Building Demolition Demolition of recently acquired building, parking lot design and
permitting and construction FY25
Tree Planting and Forest Management Program
New tree planting islandwide. Assess and evaluate areas to manage
undergrowth and promote specimen trees and park/facility functionality. FY25
Station 1 replacements Carpet replacement, LED light conversion, Shower door replacement,
and replacement of bay doors ($200k). FY25
Station 3 replacements
Replace carpet, bathroom renovations throughout, and interior painting,
and replacement of bay doors ($200k)
Replace Generator
FY25
Station 4 replacements Interior painting and replace kitchen, hallway and utility room flooring
and replacement of bay doors ($200k) FY25
Station 5 replacements Replace flooring in kitchen, hallways and utility room.
Replacement of bay doors in FY26 FY25
Station 6 replacement
Renovation in storage closets, repaint weight room and bunk rooms, add
electrical outlets to bunk rooms, concrete pad under pullup station, and
new lockers in officers bunkroom.
Replacement of bay doors in FY26
FY25
Station 7 replacements
Replace cooktop, replace carpet in living quarters, and replace
insulation in bay roof area.
Replaement of bay doors in FY26
FY25
FY25 Fire Training Center Replace the flooring in office and laundry with LVF. FY25
Island Recreation Association - Capital Projects
FY24 Accomplish and FY25 CIP Budget.xlsx Page 4 03/29 /2024
Page 7 of 10
TOWN OF HILTON HEAD ISLAND - CAPITAL IMPROVEMENTS PROGRAM FY25 PRIORITY LIST
PROJECTS PROJECT SCOPE STATUS STAFF
PRIORITY
PC
PRIORITY
TC
PRIORITY
FY25 Fire Rescue HQ replacements Exterior storage shed renovation, front lobby renovation, and electrical
panel surge protection. FY25
FY25 EOC replacements Center work station renovation, chairs, and painting of interior hallway,
dispatch kitchen, office, counter top. FY25
Security access upgrades Replacement of the door access control systems at all Fire/Rescue
locations FY25
Discovery House
Paint exterior and interior, doors/hardware, wood rot repairs
FY25
Armstrong/Hack House Floors and office renovation FY25
Pavilion Floors FY25
Discovery Lab Interior repairs FY25
Pavilion/Restroom Building Structural repairs FY25
Horse Barn Structural repairs FY25
Misc. Improvements Front and side gates, boardwalks repair, tree work, well/field irrigation,
fence repair, HVAC platform and replacement FY25
Hay Barn Interior repairs FY25
Event Space Improvements Construction of Town initiated enhancements including ADA compliance
and lighting upgrades FY25
Historic Mitchelville Freedom Park - Capital Projects
At the request of Ahmad Ward, Executive Director, Historic Mitchelville
Freedom Park seeks funds to improve property in accordance with
approved master plan
FY24 CARRY
FORWARD
Town Strategic Plan SWOT for Town Connectivity Strategic Plan request for connectivity SWOT analysis FY24 CARRY
FORWARD
Station Alerting Current Station Alerting system is reaching end of service and is not
compatible with modern IT infrastructure. Costs to maintain are
increasing and parts are difficult to obtain Complete in FY24
FY24 CARRY
FORWARD
Dispatch Center Workstation Desks Replacement of Dispatch workstation desks FY25
Hardware Reserve This will be for any unplanned needs that arise during the budget year FY25
Conference Room replacement equipment for
Fire Stations 1,5, and 6
Conference Room AV equipment for Fire Stations 1,5,6 for staff trainings
and community meetings FY25
Infrastructure lifecycle replacement year 2 of 5 Second year of five year infrastructure lifecycle replacements. Part of IT
Strategic Plan, 20% of equipment for five year FY25
ESRI to hosted solution
Request to move the services needed to operate ESRI, public
dashboards, and maps to a hosted solution for continuity of government
during a disaster related emergency. Part of IT Strategic Plan FY25
ESRI Advantage Program Software and Application Package, year 2 of 2 FY25
Replacement of end user equipment year 2 of 4
Replacement of end user laptops, docking stations, monitors, etc. This is
the second year of four year life cycle replacement within our IT Strategic
Plan
FY25
Document Management Migration from
Laserfiche to Sharepoint
Request to migrate document management system to Sharepoint for
more modern and user friendly system, part of out IT Strategic Plan FY25
Public Safety Equipment Replacement Public Safety and dispatch replacement equipment for fleet vehicles
and dispatch areas. Also includes replacement radios and batteries. FY25
Website Migration Migration of custom website to a content management system (CMS). FY25
Public Safety Cameras Add 16 specialty public safety cameras to the Town for enhanced
coverage
FY24 CARRY
FORWARD
Chaplin Park Camera replacements Replace existing cameras and add cameras where there is no coverage
at the soccer fields FY25
Jarvis Creek Park Camera Replacements Replace cameras and public wifi equipment FY25
Ford Shell Ring Camera Installation Install safety cameras FY25
Islanders Beach Park Camera Replacements Replace cameras and public wifi equipment FY25
SECURITY CAMERAS & CONNECTIVITY
Public Safety Systems Equipment and Software
Dispatch Center Equipment
IT EQUIPMENT & SOFTWARE
Town Hall Equipment & Software
Coastal Discovery Museum - Capital Projects
FY24 Accomplish and FY25 CIP Budget.xlsx Page 5 03/29 /2024
Page 8 of 10
TOWN OF HILTON HEAD ISLAND - CAPITAL IMPROVEMENTS PROGRAM FY25 PRIORITY LIST
PROJECTS PROJECT SCOPE STATUS STAFF
PRIORITY
PC
PRIORITY
TC
PRIORITY
Cardiac Monitor Replacement Replace (13) cardiac monitors FY26-29
SCBA Replacement Replace SCBAs FY26-29
TIC Replacement Replace TIC FY26-29
Stretcher Replacement Replace stretchers FY26-29
Fire Hose Replacement Replace Reserve Hose FY25
Fire Hydrant Expansion Installation of Fire Hydrants through matching program with HHPSD.
Reoccuring annually
FY24 CARRY
FORWARD
TOTAL FACILITIES AND EQUIPMENT PROGRAM
STORMWATER PROGRAM
Wexford Debris System Design
30000PWE-55300-WEP00 BUDGET
30000PWE-55322-WEP00 DESIGN
Overhaul including 2 new pumps, new controls, debris screens, new
genset, new conduit, new SCADA monitoring system, new control
building in FY26/FY27;
need to plan for $5 million in one fiscal cycle, construction must occur
between late Sept and late May
Design of pump station to consider multiple factors including function
and aesthetics in preparation for FY24 construction
$400K to To sandblast and repaint pump chamber walls and fill in
sinkholes around the perimeter of the well.
$60K for additional engineering design.
FY24 CARRY
FORWARD
Gum Tree Road Improvements
30000CXN-55300-XN116 BUDGET
30000CXN-55325-XN116 SURVEY
Permitting & Construction of improvements to address various
deficiencies along Gum Tree Road between Katie Miller Drive and
Georgianna Drive, including regrading of ditches, installation of new
inlets, new pipe and repairs along the outfall system
$75K to implement improvements
FY24 CARRY
FORWARD
Jarvis Creek Outfall
30000CXN-55300-XN117 BUDGET
30000CXN-55325-XN117 SURVEY
Installation of flap gates on the outfall end of tw o 84-inch diameter
concrete pipes that discharge stormwater from the Jarvis Creek Pump
Station outfall system; necessary to improve operation and effectiveness
of the pump station during extreme events by mitigating the impacts of
tidal storm surge on the system
$125K to complete permitting and design
Construction in FY26
FY24 CARRY
FORWARD
25 Moonshell Road
30000CXN-55300-XN068 BUDGET
30000CXN-55324-XN068 ENVIRONMENTAL
Permitting & Installation of 500 linear feet of 24- inch pipe and two inlet
structures to improve efficiency and reduce long-term maintenance
costs along the existing Folly Field ditch between Moonshell Road and
the Island Club
$90K for construction in late FY25
FY24 CARRY
FORWARD
Cordillo Court Improvements
30000CXN-55300-XN119 BUDGET
Permitting & installation of improvements to address drainage issues on
and adjacent to Town-owned property including inlets, pipe and minor
grading
FY24 CARRY
FORWARD
Palmetto Hall Outfall Improvements
Addition of hydraulic capacity at the system outfall and addition of
backflow prevention devices;
$100K for consultant design ($75K) & field surveys ($25K)
FY25
Lawton Pump Station
30000PSP-55300-SPP01 BUDGET
30000PSP-55385-SPP01 REPLACEMENT
Third pump at Lawton Station to complete replacement of all 2006
pumps
FY23 Carry Forward (Budget Amendment): $980,000 for 2 new pumps and
5 new gates +
FY24 Third pump at Lawton ($350K) to complete replacement of all 2006
pumps
FY24 CARRY
FORWARD
Pump Station Security Cameras
30000CXN-55300-XN131 BUDGET
30000CXN-55350-XN131 EQUIPMENT
Add security cameras at pump stations
FY24 CARRY
FORWARD
Howell Tract Access Gate Install a new automatic gate with code or card access at the entrance
to the Howell Tract lay-down yard on Arrow Road FY25
Main Street Drainage Improvements
300000CR-55300-RR099 BUDGET
Improvements based on 2019 assessment completed by SWU
$100K to complete cleaning and CCTV of trunk line system;
$150K to undertake any critical improvments needed.
FY25
TOTAL STORMWATER PROGRAM
FIRE/MEDICAL SYSTEMS & EQUIPMENT REPLACEMENT
FY24 Accomplish and FY25 CIP Budget.xlsx Page 6 03/29 /2024
Page 9 of 10
TOWN OF HILTON HEAD ISLAND - CAPITAL IMPROVEMENTS PROGRAM FY25 PRIORITY LIST
PROJECTS PROJECT SCOPE STATUS STAFF
PRIORITY
PC
PRIORITY
TC
PRIORITY
FLEET PROGRAM
Town Vehicle Replacement
Staff Vehicle Replacement Replacement of staff vehicles over 10 years old including vehicle
outfitting FY25
New Staff Vehicles Vehicles including vehicle outfitting for new staff as needed. No roll
forward. No new Money FY25
Engine/Pumper Replacement/Quint Company
Replacement (2)
FY24 CARRY
FORWARD
Support Vehicle Replacement FOrk lift Delivered in service. FY25 $ is for Service Truck FY24 CARRY
FORWARD
Ladder Truck Replacement (2) Ladder Truck Replacement - (2) Tillers
min. 36 month build FY25
Specialty Vehicles Replacement of Specialty vehicles FY24 CARRY
FORWARD
Battalion 1 Replacement Replacement of Battalion 1 vehicle FY24 CARRY
FORWARD
Medic Unit Replacement Replacement of Medic Units (10-year cycle) FY24 CARR Y
FORWARD
Public Safety Boat
War Eagle 19' Aluminum Boat
FY25
TOTAL FLEET PROGRAM
LAND ACQUISITION & ADMINISTRATION
Land Acquisition Administration
Land acquisition and soft costs including ROW, Survey, Appraisals, Legal
Fees, etc. Includes demolition and clean up of Jonesville Road property. N/A N/A N/A N/A
Land Acquisition
Land acquisition: 30 Bryant Road, 71 Shelter Cove Lane, 72 Pope Avenue,
.5 acre Mathews Drive
N/A N/A N/A N/A
FR Apparatus & Vehicle Replacement
FY24 Accomplish and FY25 CIP Budget.xlsx Page 7 03/29 /2024
Page 10 of 10