William Hilton Parkway Gateway Corridor IRAC - NEW DATE — Agenda Packet
Town of Hilton Head Island · Beaufort County · William Hilton Parkway Gateway Corridor Independent Review Advisory Committee · meeting of Mar 27, 2024 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
William Hilton Parkway Gateway Corridor Independent
Review Advisory Committee Meeting
Wednesday, March 27, 2024, 1:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Approval of the Minutes
a. Regular Meeting Minutes of February, 14, 2024
3. Unfinished Business
a. Update on Project Scope of Work
4. New Business
a. Update on Community Outreach Related to Project Impacts
b. Presentation of Preliminary Findings of the End to End Independent Study for
the William Hilton Parkway Gateway Corridor Project
1. 2023 Existing Conditions - VISSIM Model Based Findings
2. 2045 No Build Conditions - VISSIM Model Based Findings
3. Evaluation and Findings to Date of Four Alternatives
5. Appearance by Citizens:
6. Adjournment
FOIA Compliance: Public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
Page 1 of 112
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 2 of 112
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
2/14/2024 Page | 1
Town of Hilton Head Island
WILLIAM HILTON PARKWAY GATEWAY
CORRIDOR INDEPENDENT REVIEW
ADVISORY COMMITTEE MEETING
Wednesday, February 14, 2024, 1:00 PM
Minutes
1. Call to Order
Mayor Perry called the meeting to order at 1:00 PM. Present were: Mayor Alan Perry,
Diederik Advocaat, Charles Walczak, Edward C. Warner, Jr., and Willie Young. Henry Ford
was absent.
2. Approval of the Minutes
a. Regular Meeting Minutes of January 10, 2024
A motion was made by Mr. Walczak to approve the minutes of the January 10, 2024
meeting as presented. A second was made by Mr. Warner, and the motion was
unanimously passed.
3. Unfinished Business
a. William Hilton Parkway Gateway Corridor Independent Study - Project Progress
Shawn Colin, Assistant Town Manager - Community Development, presented a short
overview of the progress made since the Town Council adoption of the resolution creating
the Committee. Those tasks completed included the appointment of the membership
Committee by Town Council; putting together the RFQ and scope of work to solicit a
qualified consultant and helping select the "Preferred Consultant"; and making a
recommendation to contract with that firm. He noted that the final task of the Committee
was to work with staff to guide the work of Lochmueller, consistent with the final scope of
work that was approved by both Town Council and the Committee. He outlined in detail
the 5 tasks within the scope of work that was approved by the Committee and Town
Council and the status of each, all as shown in the presentation included in the agenda
packet. Nate Nohren, Project Manager for Lochmueller Group, briefly presented an
update on project progress - key tasks completed and those they are continuing to work
on since the last Committee meeting, as outlined in the presentation attached to the
agenda packet. He noted videos and preliminary findings will be provided for the March
meeting. Questions from Committee members were addressed by Mr. Nohren and Kate
Swinford.
1. Presentation of Final Recommendation for Growth Rate
Page 3 of 112
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
2/14/2024 Page | 2
Shariff Ullah, with Lockmueller Group, appearing remotely, reviewed in detail how the
annual population growth rate for Hilton Head Island was determined, as is shown in the
presentation included in the agenda packet. Questions from the Committee were
addressed by Mr. Ullah and Ms. Swinford. Mr. Ullah indicated they had a 95% confidence
rate in their calculations.
2. Presentation of Adaptive System Operations
Tyson King, from Lochmueller, appearing remotely, presented travel time run
observations for the adaptive systems operations, as shown in the presentation included
in the agenda packet. A video dash cam was shown of a trip from Moss Creek across the
bridges through intersections at Squire Pipe Road, Spanish Wells, and Gum Tree
intersections. Questions from the Committee members were addressed by Mr. King.
3. Presentation of 2023 Existing Conditions - Syncro Modeling based Findings
Ms. Swinford, from Lochmueller, appearing remotely, presented the preliminary 2023
existing conditions modeling based findings using Synchro 11 methodology, as outlined in
the presentation included in the agenda packet. Final results will be presented at the
March Committee meeting. Questions from Committee members were answered by Ms.
Swinford.
4. Update on VISSIM Modeling
Ms. Swinford explained briefly how the VISSIM calibration methodology is developed with
a high degree of confidence, as shown in the presentation included in the agenda packet.
Questions from Committee members were answered by Ms. Swinford.
4. Appearance by Citizens
No citizens have requested to appear before the Committee regarding items not on the
agenda. Public comments concerning agenda items were to be submitted electronically via
the Open Town Halal portal. No comments were received. Public comments were made by
several citizens in attendance.
5. New Business
A discussion ensued concerning the Committee's scope of work, which Mayor Perry reminded
the Committee is to study and review independently the plans that Beaufort County and
SCDOT have presented to minimize any negative results impacting the Town.
6. Adjournment
The meeting was declared adjourned at 3:02 PM.
Approved:
Page 4 of 112
Town of Hilton Head Island William Hilton Parkway Gateway Corridor Independent Review Advisory
Committee
Meeting Minutes
2/14/2024 Page | 3
The recording of this Meeting can be found on the Town’s website
at www.hiltonheadislandsc.gov
Page 5 of 112
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Willliam Hilton Parkway
Gateway Corridor Advisory Committee
TO: Advisory Committee
FROM: Shawn Colin
DATE: March 27, 2024
SUBJECT: Transmittal of Meeting Materials from the Lochmueller Group
Agenda
RECOMMENDATION:
This memo servs as the transmittal document to cover the materials submitted for
consideration by the Lochmueller Group. This material will be covered at the march 27,
2024 meeting of the William Hilton Parkway Gateway Corridor Advisory Committee.
ATTACHMENTS:
1. The Lochmueller Group Document Transmittal Memo – dated March 22, 2024
2. Presentation by the Lochmueller Group – dated March 27, 2024
Page 6 of 112
TRANSMITTAL
To: Shawn Colin, AICP – Town of Hilton Head Island
From: Nate Nohren, PE, PTOE
Date: March 22, 2024
Subject: Copy of Power Point Presentation for 3/27/2024 Advisory C ommittee Meeting
RE: William Hilton Parkway Gateway Corridor Indepen dent Review
Hi Shawn,
Attached please find a PDF copy of the power point slides we will be presenting at the March 27, 2024,
Advisory Committee meeting. The content provided w ithin our presentation can be summarized as
follows:
• Update on Project Progress – we will provide the Committee an update on what our team has
been working on and/or completed since the February 14 Committee meeting. We also provide
current status of percent-of-work completed to date , as well as on-going or upcoming work
subtasks, relative to Tasks 1, 2, and 3, as describe d in the Town approved Scope of Services
Addendum (9/29/2023). As you are aware, Tasks 4 and 5 canno t be initiated until Task 3 is
completed.
• Presentation of 2023 Existing Conditions & 2045 No-Build (V ISSIM Based Findings) – we will
share our VISSIM based findings relative to 2023 Exist ing and 2045 No-Build Conditions for the
entire project study area. We will provide information related to travel times; calibration results
in terms of travel time and volumes; speed maps; videos of congested locations during peak
hours; and summary of overall findings. For the sa ke of time, we do not intend to speak about
traffic volumes and operating conditions at each in dividual intersection during the presentation;
however, we have provided exhibits illustrating tra ffic and operating conditions (Synchro and
VISSIM based findings) at all project intersections within the Appendix of the presentation, and
can speak to specific questions if they do come up.
• Presentation of Four Recommended Alternatives – we will present the four corridor
Alternatives we’ve selected for evaluation, with re spect to the Modified Original Project Study
Area (US 278/WHP from Moss Creek to Gum Tree Road). W e’ve completed traffic operational
evaluations for three of the four corridor Alternat ives, and will go into detail as to what is
included in each Alternative; why it was selected f or consideration; and provide a preliminary
pros/cons list for each Alternative. We are still working on finalizing traffic operational
evaluations for the fourth Alternative, so we will not have that level of information ready for
discussion; however, we’ve prepared a conceptual ex hibit that shows basic geometry of what
we’re envisioning, as well as anticipated pros/cons of this Alternative. For the sake of time, we
do not intend to speak about traffic volumes and op erating conditions at each individual
intersection for each Alternative during the presentation; however, we have provided exhibits
illustrating traffic and operating conditions (Sync hro based findings) at all project intersections
within the Appendix of the presentation, and can sp eak to specific questions if they do come up.
Please let me know if you have any questions regard ing the information shared above. Otherwise, we
look forward to speaking with you all on March 27.
Sincerely,
Nate Nohren, PE, PTOE
Page 7 of 112
William Hilton Parkway Gateway Corridor
Independent Review Advisory Committee Meeting
March 27th, 2024
Page 8 of 112
Agenda
❑ Update on Project Progress
❑ Presentation of 2023 Existing Conditions (VISSIM Based Findings)
❑ Presentation of 2045 No Build Conditions (VISSIM Based Findings)
❑ Presentation of Four Recommended Alternatives
Page 9 of 112
Update on Project Progress
(Key Tasks Completed & Continuing to Work on Since Last Meeting)
✓ Completed 2045 No-Build analyses in Synchro.
✓ Completed 2023 Existing & 2045 No-Build VISSIM speed maps for the entire study area;
videos focusing on congested locations during peak hours; calibration results in terms of
travel time and volumes.
✓ Completed preliminary traffic analyses & Synchro modeling for proposed Alternatives #1, #2,
& #3.
✓ Continuing to finalize preliminary traffic analyses & Synchro modeling for proposed
Alternative #4.
✓ Evaluating Roadway, ROW, and Environmental impacts & developing high-level, order of
magnitude costs for Alternatives #1, #2, #3, & #4.
✓ Met with Town Staff on March 7, March 14, and March 20 to discuss project progress leading
up to this March 27 Advisory Committee meeting.
Page 10 of 112
• Task #1: Project Initiation and Coordination
o ~70% Complete
o Task #1 Subtasks On-Going:
➢ Remaining scheduled meetings with Town (Bi-Weekly) staff and Committee
(Monthly)
➢ Continual review/reference previously completed existing reports and
historical documentation
➢ Reviewing background information received to date related to Task 1.3.3
and Task 1.8; forthcoming brief technical memorandums and/or high level
opinions of probable costs.
Update on Overall Project Progress (as of 3/22/24)
70% 30%
Overall ~45% Complete 45% 55%
Page 11 of 112
Update on Overall Project Progress (as of 3/22/24)
Task #2: Review of Travel Demand Model & Evaluation of
2023 Existing Operating Conditions (Entire Study Area)
o 100% Complete 100%
Page 12 of 112
Update on Overall Project Progress (as of 3/22/24)
• Task #3: Traffic Model and Operational Update –
Modified Original Project Study Area
o ~35% Complete
o Key Subtasks On-Going:
➢ Continuing to finalize preliminary traffic analyses & Synchro modeling for
proposed Alternative #4.
➢ Evaluating Roadway, ROW, and Environmental impacts & developing high-
level, order of magnitude costs for Alternatives #1, #2, #3, & #4.
o Key Subtasks Forthcoming:
➢ Prepare Draft & Final Summary of Findings Memos RE: Alternatives Analysis
➢ Participation in Public Open-House / Design Charrette (if required), to be led
by Town staff
35% 65%
Page 13 of 112
2023 Existing Results (VISSIM)
• Travel Time results
Corridor
Observed travel time (secs) Simulated travel time (secs) % Difference
AM PM AM PM AM PM
Hilton Parkway
between Moss
Creek and Indigo
Run
EB 1108 672 1157 619 4.42% -7.91%
WB 605 1202 572 1252 -5.50% 4.17%
Hilton Parkway
@Moss Creek to
Cross Island
Parkway @Sea
Pine
SB 1378 821 1356 857 -1.58% 4.37%
NB 800 1516 826 1520 3.20% 0.25%
All travel time targets are satisfied and met
Page 14 of 112
2023 Existing Results (VISSIM)
• Volume results
Location
Observed volume results
(vehicles)
Simulated volume results
(vehicles)
% Difference
AM PM AM PM AM PM
Hilton Parkway west of Squire
Pope EB 2774 2237 2970 2240 7.07% 0.13%
Hilton Parkway west of Squire
Pope WB 1639 3030 1650 2898 0.67% -4.36%
Hilton Parkway east of Spanish
Wells EB 2729 1991 2929 1955 7.33% -1.81%
Hilton Parkway east of Spanish
Wells WB 1408 2623 1423 2614 1.07% -0.34%
Cross Island Parkway north of
Marshland Rd NB 975 1422 964 1371 -1.13% -3.59%
Cross Island Parkway north of
Marshland Rd SB 1416 1190 1486 1167 4.94% -1.93%
All volume targets are satisfied and met
Page 15 of 112
2023 Existing Results (VISSIM)
AM Speed Map
Page 16 of 112
2023 Existing Results (VISSIM)
PM Speed Map
Page 17 of 112
2023 Existing Results (VISSIM) - AM
Page 18 of 112
2023 Existing Results (VISSIM) - PM
Page 19 of 112
2045 No Build Results (VISSIM)
o Travel time results:.
o Travel time is expected to increase by up to approximately 62% when comparing Existing Conditions to
2045 No Build Conditions
Corridor
Existing Simulated travel
time (secs)
2045 No Build Simulated
travel time (secs) % Difference
AM PM AM PM AM PM
Hilton Parkway
between Moss
Creek and Indigo
Run
EB 1157 619 1579 642 36.47% 3.72%
WB 572 1252 584 1544 2.10% 23.32%
Hilton Parkway
@Moss Creek to
Cross Island
Parkway @Sea
Pine
SB 1356 857 1984 873 46.31% 1.87%
NB 826 1520 823 2465 -0.36% 62.17%
Page 20 of 112
2045 No Build Results (VISSIM)
o Volume results:
o Note that the % Difference with negative values are due to over-saturation. This results in vehicles not
being able to enter the network to go through intersection.
Location
Existing Simulated volume
results (vehicles)
2045 No Build Simulated
volume results (vehicles) % Difference
AM PM AM PM AM PM
Hilton Parkway west of Squire
Pope EB 2970 2240 2783 2524 -6.30% 12.68%
Hilton Parkway west of Squire
Pope WB 1650 2898 1843 2754 11.70% -4.97%
Hilton Parkway east of Spanish
Wells EB 2929 1955 2748 2198 -6.18% 12.43%
Hilton Parkway east of Spanish
Wells WB 1423 2614 1570 2413 10.33% -7.69%
Cross Island Parkway north of
Marshland Rd NB 964 1371 1065 919 10.48% -32.97%
Cross Island Parkway north of
Marshland Rd SB 1486 1167 1440 1299 -3.10% 11.31%
Page 21 of 112
2045 No Build Results
(VISSIM)
AM Speed Map
Page 22 of 112
2045 No Build Results
(VISSIM)
PM Speed Map
Page 23 of 112
2045 No Build Results (VISSIM) - AM
Page 24 of 112
2045 No Build Results (VISSIM) - PM
Page 25 of 112
Existing and 2045 No Build Conclusions
• As shown, significant congestion currently exists throughout the study area. This
congestion is expected to be exacerbated by 2045 with the forecasted growth.
• 2023 existing traffic volumes would need to be reduced by approximately 30%
for the current 4-lane configuration to operate acceptably.
• Based on an annual growth rate of 0.56%, 2045 traffic volumes would need to be
reduced by approximately 40% for the current 4-lane configuration to operate
acceptably.
• Therefore, it is our recommendation that a six-lane section is necessary to
accommodate the projected traffic volumes.
Page 26 of 112
Second Bridge
• A second bridge has been discussed locally as a potential solution
• A new bridge could take up to 20 years to construct once all the studies,
planning, design, and construction is complete
• The operating conditions today already show significant congestion
• Our focus is to mitigate the existing and forecasted conditions, and as shown in
20 years, the congestion along the corridor will be significant
• It is our opinion that a 6-lane section is needed independently of a second bridge
Page 27 of 112
Town of Hilton Head Island Gateway Corridor
Project Guiding Principles
• Lochmueller Group studied four alternatives to help improve the US 278 corridor. In
determining the most beneficial and appropriate alternatives, the following guiding
principles were top of mind:
• Fix the transportation issues in the corridor in a way that improves the safety and quality of life for all residents,
workers, and visitors to Hilton Head Island
• Address transportation needs for natural disasters and resiliency of island access
• Consider future transportation alternatives
• Improve the safety and quality of life for the residents of the neighborhoods and businesses directly impacted
by the US 278 corridor
• Stoney Community
• Neighborhoods on Jenkins and Hog Islands (including but not limited to Windmill Harbor)
• Have gateway to and from Hilton Head Island that the region will be proud of:
• Aesthetically pleasing and reflecting the Hilton Head Island/Low County values
• Safe and functional pathways for pedestrians and cyclists
• Minimizes environmental impacts and enhances the national asset of Pinckney Island
Page 28 of 112
Recommended Alternative Improvements
• Alternative 1: SCDOT Modified Recommended Preferred
• Alternative 2: Bowties at Squire Pope and Spanish Wells
• Alternative 3: Echelon / Center Turn Overpass
• Grade Separated Intersection at either Squire Pope or Spanish Wells
• Alternative 4: Elevated Bypass
Page 29 of 112
Alternative 1 – SCDOT Modified Recommended
Preferred
Page 30 of 112
Alternative 1 – SCDOT Modified Recommended
Preferred
• This alternative considers the Modified Recommended Preferred Alternative
from SCDOT’s concept in addition to the following updates:
• Adaptive signals in place
• 0.56% growth rate
• Improvements to Gumtree
• At-grade intersection
• Complete reconfiguration is expected to improve the efficiency of the intersection
• Dual left-turn lanes at the westbound, northbound, and southbound approaches were
included
Page 31 of 112
Alternative 1 – SCDOT Modified Recommended
Preferred
• Summary of forecasted operating conditions:
• Overall, the study intersections are expected to operate acceptably under Alternative 1
• Each signalized intersection is expected to operate with a LOS D or better overall
• Side-street and unsignalized approaches may still experience long delays
• Travel times were performed in Synchro along the Hilton Parkway corridor between Moss Creek and
Indigo Run.
• When compared to the 2045 No Build Scenario, the following changes in travel time were calculated:
Scenario
Difference in Travel Time
(seconds) when Compared to
2045 No Build
% Difference
AM PM AM PM
2045 Alternative 1: SCDOT Modified Recommended
Preferred
EB -109 +18 -16.1% 2.7%
WB +43 -276 6.3% -34.2%
Page 32 of 112
Alternative 1 – SCDOT Modified Recommended
Preferred
• In order to potentially reduce the required ROW, Lochmueller evaluated if any modifications to Alternative 1 could be
implemented. The following modification were considered:
• Reduce the dual eastbound left-turn lanes at Squire Pope to one left-turn lane
• Results:
• The movement would be over capacity
• The queue length would be expected to increase from approximately 7 vehicles to 23 vehicles (+16 vehicles) during the PM peak hour.
• The delays at the movement are expected to increase from approximately 75 seconds to 214 seconds (+139 seconds.) during the PM peak hour
• Reduce the dual southbound right-turn lanes at Squire Pope to one right-turn lane
• Results:
• The movement would be over capacity
• The queue length would be expected to increase from approximately 9 vehicles to 24 vehicles (+15 vehicles) during the PM peak hour.
• The delays at the movement are expected to increase from approximately 50 seconds to 116 seconds (+66 seconds.) during the PM peak hour
Alternative 1 Potential Changes to Decrease Needed ROW
Page 33 of 112
Alternative 2 – Bowties at Squire Pope and Spanish
Wells
Page 34 of 112
Alternative 2 – Bowties at Squire Pope and
Spanish Wells
• This alternative removes left-turns from Squire Pope and Spanish Wells
• Vehicles must navigate through bowtie intersections to make their left-turn movements
Hilton Pkwy at Squire Pope Hilton Pkwy at Spanish Wells
Page 35 of 112
Alternative 2 – Bowties at Squire Pope and
Spanish Wells
• Pros of Bowties
• Improves safety as fewer conflicting
vehicle and pedestrian movements
are allowed
• Bowtie intersections have 12
fewer conflict points when
compared to traditional
intersections
• Encourages lower vehicle speeds
through the roundabouts
• Reduces the size of intersections as
left-turn lanes are removed
• Increases the efficiency of the
signalized intersections as more of
the signal time can go to the main
through movements, improving
traffic operations
• Cons of Bowties
• Requires a change in decision
making for drivers as all left-turn
movements would become right-
turns at Squire Pope and Spanish
wells
• Increases the amount of travel time
for left-turning vehicles
• Requires additional ROW for the
roundabouts
Page 36 of 112
Alternative 2 – Bowties at Squire Pope and
Spanish Wells
• Summary of forecasted operating conditions:
• The same improvements to study intersections other than Squire Pope and Spanish Wells
(including Gumtree) that were included in Alternative 1 were also included in Alternative 2
• Bowties at Squire Pope and Spanish Wells is expected to improve operations throughout the
study area
• Overall, the study intersections are expected to operate acceptably under Alternative 2
• Each signalized intersection is expected to operate with a LOS D or better overall
• Side-street and unsignalized approaches may still experience long delays
• Travel times were performed in Synchro along the Hilton Parkway corridor between Moss Creek and
Indigo Run.
• When compared to the 2045 No Build Scenario, the following changes in travel time were calculated:
Scenario
Difference in Travel Time
(seconds) when Compared
to 2045 No Build
% Difference
AM PM AM PM
2045 Alternative 2: Bowties at Squire Pope and
Spanish Wells
EB -104 -39 -15.3% -6.6%
WB +9 -290 1.4% -36.4%
Page 37 of 112
Alternative 2 – Bowties at Squire Pope and
Spanish Wells
• The expected changes in travel time for the displaced left-turn movements are
as follows:
Squire Pope
AM Peak Hour PM Peak Hour
Eastbound Left-Turn 63 seconds 42 seconds
Westbound Left-Turn 82 seconds 81 seconds
Northbound Left-Turn 101 seconds 120 seconds
Southbound Left-Turn 44 seconds 4 seconds
Spanish Wells
AM Peak Hour PM Peak Hour
Eastbound Left-Turn -10 seconds -26 seconds
Westbound Left-Turn -13 seconds -7 seconds
Northbound Left-Turn 89 seconds -42 seconds
Southbound Left-Turn 43 seconds 61 seconds
Page 38 of 112
Alternative 3 – Echelon / Center Turn Overpass
Echelon Center-Turn Overpass
Page 39 of 112
Alternative 3 – Echelon
Page 40 of 112
Alternative 3 – Echelon
• Pros of Echelon
• Improves safety as fewer conflicting vehicle
and pedestrian movements are allowed
• Echelon intersections have 10 fewer
conflict points when compared to
traditional intersections
• Does not require a change in decision
making for drivers as all movements would
remain at Squire Pope and Spanish wells
• Increases the efficiency of the signalized
intersections as more of the signal time can
go to the main through movements,
improving traffic operations
• While each approach would likely need the
same lane configurations shown in
Alternative 1, only two approaches would
conflict, which would reduce the amount of
ROW for each respective grade
• Cons of Echelon
• Requires grade separation of
intersections
• Overall, large intersections would
likely remain as all movements (left-
turn, through, and right-turn) are still
allowed
Page 41 of 112
Alternative 3 – Center Turn Overpass
Page 42 of 112
Alternative 3 – Center Turn Overpass
• Pros of Center Turn Overpass
• Improves safety as fewer conflicting
vehicle and pedestrian movements
are allowed
• Center Turn Overpass
intersections have 8 fewer
conflict points when compared
to traditional intersections
• Increases the efficiency of the
signalized intersections as more of
the signal time can go to the main
through movements, improving
traffic operations
• Reduces the size of intersections as
left-turn lanes are removed at-grade
• Cons of Center Turn Overpass
• Requires grade separation of
intersections
• Overall, large intersections would
likely remain as all movements (left-
turn, through, and right-turn) are still
allowed
Page 43 of 112
Alternative 3 – Echelon / Center Turn Overpass
• Summary of forecasted operating conditions:
• The same improvements to study intersections other than Squire Pope and Spanish Wells
(including Gumtree) that were included in Alternative 1 were also included in Alternative 3
• Overall, the study intersections are expected to operate acceptably under Alternative 3
• Each signalized intersection is expected to operate with a LOS D or better overall
• Side-street and unsignalized approaches may still experience long delays
• The long queues and delay that are expected under the 2045 No Build Scenario would be
expected to be improved overall
Page 44 of 112
Alternative 3 – Echelon / Center Turn Overpass
• Travel times were performed in Synchro along the Hilton Parkway corridor
between Moss Creek and Indigo Run.
• When compared to the 2045 No Build Scenario, the following changes in travel
time were calculated:
Scenario
Difference in Travel Time (seconds)
when Compared to 2045 No Build
% Difference from 2045 No
Build
AM PM AM PM
2045 Alternative 3: Echelon at Squire Pope
EB -191 -68 -32.1% -12.1%
WB -79 -407 -13.9% -60.0%
2045 Alternative 3: Echelon at Spanish Wells
EB -140 -11 -21.6% -1.8%
WB -15 -331 -2.3% -44.0%
2045 Alternative 3: Center Turn Overpass at Squire Pope
EB -122 +23 -18.4% 3.5%
WB -21 -319 -3.3% -41.6%
2045 Alternative 3: Center Turn Overpass at Spanish Wells
EB -134 -17 -20.6% -2.9%
WB -16 -339 -2.5% -45.4%
Page 45 of 112
Alternative 4 – Elevated Bypass
Note: The alignment shown is preliminary. Additional information such as operating results and tie-in
points will be further defined in the April 10 th meeting
Page 46 of 112
Alternative 4 – Elevated Bypass
Note: The alignment shown is preliminary. Additional information such as operating results and tie-in
points will be further defined in the April 10 th meeting
Page 47 of 112
Alternative 4 – Elevated Bypass
Note: The alignment shown is preliminary. Additional information such as operating results and tie-in
points will be further defined in the April 10 th meeting
Page 48 of 112
Alternative 4 – Elevated Bypass
• Pros of Elevated Bypass
• Improves safety as fewer through
vehicles would remain at grade,
reducing the conflicts between
vehicles and pedestrians
• Increases the efficiency of the at-
grade signalized intersections
• Significantly reduces the size of at-
grade intersections
• Provides room for growth along the
corridor
• Cons of Elevated Bypass
• Most expensive alternative
• Results in the largest construction
impact
• Requires grade separation
• Requires a change in decision
making as drivers looking to go
through the local intersections of
Squire Pope, Old Wildhorse Drive,
and Spanish Wells would need to
enter the bypass.
• However, full access would still
be provided at-grade
Page 49 of 112
Next Steps
Traffic
Operations
(Throughput
and Traffic
Simulations)
ROW Impact Environmental
Impact Safety Bike/Pedestrian
Impact
Community and
Social Impact Aesthetic Cost
Alternative 1
Alternative 2
Alternative 3
Alternative 4
• Each alternative will be compared to the same categories as shown in the draft
matrix
• The scores shown are examples for illustrative purpose only. The final matrix will
be provided in the April 10 meeting
1
2
3
4
2
2
1 = Highest Ranking
Page 50 of 112
QUESTIONS?
https://www.islandpacket.com/news/local/traffic/article235209867.html
Page 51 of 112
APPENDIX
https://www.islandpacket.com/news/local/traffic/article235209867.html
Page 52 of 112
Travel Time Comparison
Scenario
Difference in Travel Time (seconds)
when Compared to 2045 No Build % Difference
AM PM AM PM
2045 Alternative 1: SCDOT Modified Recommended Preferred
EB -109 +18 -16.1% 2.7%
WB +43 -276 6.3% -34.2%
2045 Alternative 2: Bowties at Squire Pope and Spanish Wells
EB -104 -39 -15.3% -6.6%
WB +9 -290 1.4% -36.4%
2045 Alternative 3: Echelon at Squire Pope
EB -191 -68 -32.1% -12.1%
WB -79 -407 -13.9% -60.0%
2045 Alternative 3: Echelon at Spanish Wells
EB -140 -11 -21.6% -1.8%
WB -15 -331 -2.3% -44.0%
2045 Alternative 3: Center Turn Overpass at Squire Pope
EB -122 +23 -18.4% 3.5%
WB -21 -319 -3.3% -41.6%
2045 Alternative 3: Center Turn Overpass at Spanish Wells
EB -134 -17 -20.6% -2.9%
WB -16 -339 -2.5% -45.4%
Note that the travel times were completed in Synchro for the Hilton Parkway corridor between Moss Creek and Indigo Run
Page 53 of 112
2023 Existing VISSIM Results
Page 54 of 112
1
2
4
3
1
AM Peak Hour Volumes PM Peak Hour Volumes
74
2
4 16
436
627
11
28
232
879
25
Bluffton Pkwy
Buckingham
Plantation Dr
2
US 278
Buckingham
Plantation Dr
3
78
0
8 68
1084
60
0
45
8
1792
2
US 278
Salt Marsh Dr
4
1162
414
15
1843
2
US 278
Fording
Island Rd Ext
1
99
12
2 10
923
2024
12
26
88
654
22
Bluffton Pkwy
Buckingham
Plantation Dr
2
122
36
67 45
1992
2150
40
20
94
1441
56
US 278
Buckingham
Plantation Dr
3
78
0
5 56
1980
280
0
40
24
1496
8
US 278
Salt Marsh Dr
4
US 278
Fording
Island Rd Ext
68
25
42 23
1119
2029
60
170
62
1590
35
2044
1620
20
1517
24
2023 Existing Traffic
Volumes
Page 55 of 112
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0
0
0 0
1624
00
0
2
2
2763
41 3
1607
3014
0
402740
32
5
1634
6
4
6
2774
6
1622
02
10
2762
3
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
10
0
4 6
3001
22
0
6
4
2211
40 5
2975
5032
0
522195
30
10
3020
10
6
10
2237
6
3005
24
12
2213
8
US 278
Blue Heron
Point Rd
2023 Existing Traffic
Volumes
Page 56 of 112
9
10
11
12
9
AM Peak Hour Volumes PM Peak Hour Volumes
212
0
45 43
1425
22
0
5
156
2620
2
US 278
Squire Pope
Rd
11
12
70
127 56
1281
71121
43
121
43
2481
146
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
20
1394
76
267092
179
212 189
775
1938
144
290
154
1527
6
9
341
2
41 57
2687
22
25
2
222
1992
29
US 278
Squire Pope
Rd
11
33
78
62 84
2508
31259
47
60
51
1869
115
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
64
2736
10
2035107
183
242 326
1542
195224
207
277
125
1065
23
2023 Existing Traffic
Volumes
Page 57 of 112
13
14
17
15
16
13
AM Peak Hour Volumes PM Peak Hour Volumes
181
27
244 302
953
223
45
0
253
1708
68
US 278
Jarvis Park
15
20 20
997
5
5
5
1676
5
US 278
Central Ave
16
US 278
Hatton Pl
14
US 278
Pembroke Dr
10 41
1012
101589
92 45
12
18 31
953
33259
21
37
80
1631
241
17
US 278
Indigo Run Dr
111
68
214 166
862
3380
51
33
129
1415
55
13
246
8
86 64
1761
456
8
10
113
1422
49
US 278
Jarvis Park
15
5 21
1515
5
10
5
1299
2
US 278
Central Ave
16
US 278
Hatton Pl
14
US 278
Pembroke Dr
10 10
1531
591304
5 51
27
14 27
1462
31316
35
37
57
1258
203
17
US 278
Indigo Run Dr
111
115
251 304
1366
5164
115
49
164
1152
47
2023 Existing Traffic
Volumes
Page 58 of 112
18
AM Peak Hour Volumes PM Peak Hour Volumes
6
374
2
0
Honey Horn Rd
Cross Island Pkwy SB
20
79
18471
58
126
122
Marshland Rd
Cross Island
Pkwy NB
19
Marshland Rd
Cross Island
Pkwy SB140
115
36
0
23
225
242
18
Honey Horn Rd
19
20
18
8
397
40
15
Honey Horn Rd
Cross Island Pkwy SB
20
37
305252
142
48
143
Marshland Rd
Cross Island
Pkwy NB
19
Marshland Rd
Cross Island
Pkwy SB420
137
78
2
61
130
135
2023 Existing Traffic
Volumes
Page 59 of 112
22
23
21Bay Pines Rd
21
AM Peak Hour Volumes PM Peak Hour Volumes
0
1714
5
899
0
5
Bay Pines Rd
Palmetto Bay
22
Arrow Rd
Palmetto Bay
23
1603
16 5
5745
5
Genesta St
Palmetto Bay
53
1443
223 118
11
3844
672
34
114
15
138
21
10
1313
20
1721
10
10
Bay Pines Rd
Palmetto Bay
22
Arrow Rd
Palmetto Bay
23
1188
5 5
51537
4
Genesta St
Palmetto Bay
86
1062
175 328
36
38120
1346
76
67
29
93
2023 Existing Traffic
Volumes
Page 60 of 112
24
25
26
Bay Pines Rd
AM Peak Hour Volumes PM Peak Hour Volumes
24
5
5745
0
1583
25
Palmetto
Business Park
Palmetto Bay
25
5
5740
20
1548
40
Bow Cir
Palmetto Bay
26
5
10755
23
1503
50
Archer Rd
Palmetto Bay
24
10
51531
5
1188
5
Palmetto
Business Park
Palmetto Bay
25
10
101526
10
1183
10
Bow Cir
Palmetto Bay
26
10
101526
10
1183
10
Archer Rd
Palmetto Bay
2023 Existing Traffic
Volumes
Page 61 of 112
27
28
29
27
AM Peak Hour Volumes PM Peak Hour Volumes
87
1279
147 53
34
9755
679
25
46
17
46
Target Rd
Palmetto Bay
28
Dunnagans
Alley
Palmetto Bay
29
465
688
158 160
252
18336
376
177
263
132
50
Green wood
Palmetto Bay
1306
116 10
5
749
50
27
53
1083
57 111
44
78111
1253
46
172
44
76
Target Rd
Palmetto Bay
28
Dunnagans
Alley
Palmetto Bay
29
Green wood
Palmetto Bay
1227
10 61
29
1349
10
484
667
105 383
347
12055
618
355
358
177
181
2023 Existing Traffic
Volumes
Page 62 of 112
2023 Existing Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (12.2) B (11.4)
Eastbound Approach B (12.5) [43] {324} B (11.7) [<25] {178}
Westbound Approach A (8.3) [<25] {171} A (9.3) [<25] {234}
Northbound Approach D (38.1) [<25] {73} C (32.2) [<25] {65}
Southbound Approach A (9.0) [<25] {68} B (12.6) [<25] {84}
2: Buckingham Plantation Dr/Moss Creek Dr & Hilton Pkwy (signal)
Overall Intersection D (47.2) B (19.5)
Eastbound Approach E (70.7) [807] {1620} B (15.6) [65] {522}
Westbound Approach B (14.4) [35] {353} B (19.1) [100] {633}
Northbound Approach D (35.9) [37] {263} D (53.6) [<25] {104}
Southbound Approach D (42.4) [<25] {92} C (33.6) [29] {161}
3: Salt Marsh Dr/Moss Creek Village & Hilton Pkwy (un-signalized)
Eastbound Left Turn E (35.3) [720] {1302} C (19.7) [<25] {47}
Westbound Left Turn F (414.9) [37] {107} B (11.2) [<25] {41}
Northbound Approach B (10.1) [<25] {61} A (7.3) [<25] {55}
Southbound Approach C (19.7) [<25] {76} A (8.0) [<25] {73}
4: Fording Island Rd Ext & Hilton Pkwy (un-signalized)
Westbound Left Turn E (40.7) [46] {102} C (16.8) [<25] {28}
Northbound Approach F (591.0) [120] {186} C (17.5) [<25] {41}
1
2
4
3
Page 63 of 112
2023 Existing Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
5: Boat Landing Driveway/Wildlife Refuge Driveway & Hilton Pkwy (un-signalized)
Eastbound Left Turn C (21.4) [691] {1658} D (33.1) [<25] {<25}
Westbound Left Turn No volumes observed C (20.9) [<25] {<25}
Northbound Approach F (270.5) [<25] {38} C (20.8) [<25] {46}
Southbound Approach No volumes observed C (18.2) [<25] {39}
6: Blue Heron Point Rd & Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed D (27.7) [<25] {<25}
Northbound Approach F (1,270.4) [123] {228} C (23.8) [<25] {60}
7: Crosstree Dr (Windmill Harbour) & Hilton Pkwy (signal)
Overall Intersection B (10.4) A (8.2)
Eastbound Approach A (8.4) [335] {1093} A (5.4) [62] {890}
Westbound Approach B (10.7) [53] {655} A (7.5) [292] {1626}
Northbound Approach E (67.8) [30] {164} E (79.0) [52] {214}
Southbound Approach B (17.3) [<25] {<25} A (0.0) [<25] {<25}
8: Jenkins Rd & Hilton Pkwy (un-signalized)
Eastbound Left Turn A (8.2) [<25] {<25} F (98.0) [<25] {54}
Southbound Approach F (51.8) [<25] {44} F (109.4) [<25] {92}
Jenkins Rd
5
7
6
8
Crosstree Dr
Page 64 of 112
2023 Existing Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection D (39.2) E (67.3)
Eastbound Approach E (56.8) [451] {1334} B (19.3) [283] {1132}
Westbound Approach A (7.0) [39] {618} F (104.8) [874] {1383}
Northbound Approach C (31.9) [<25] {38} E (78.6) [<25] {76}
Southbound Approach C (21.7) [<25] {147} F (91.6) [220] {638}
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach A (1.3) [<25] {<25} A (6.4) [<25] {25}
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection C (29.8) F (240.4)
Eastbound Approach C (26.6) [270] {1027} B (17.1) [103] {622}
Westbound Approach C (21.9) [87] {471} F (415.7) [892] {989}
Northbound Approach E (57.1) [85] {321} F (395.1) [1241] {1288}
Southbound Approach F (89.0) [103] {319} E (63.9) [58] {242}
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection D (40.7) E (66.4)
Eastbound Approach D (40.6) [765] {1592} D (49.9) [203] {779}
Westbound Approach C (30.3) [136] {357} E (75.2) [961] {1610}
Northbound Approach C (29.0) [75] {291} D (45.2) [175] {338}
Southbound Approach E (77.2) [182] {579} F (93.4) [234] {779}
9
10
11
12
Page 65 of 112
2023 Existing Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
13: Jarvis Park Rd/Wilborn Rd & Hilton Pkwy (signal)
Overall Intersection C (21.8) C (25.8)
Eastbound Approach B (17.1) [178] {929} B (13.8) [67] {754}
Westbound Approach B (17.9) [73] {543} C (34.2) [668] {1285}
Northbound Approach F (81.1) [45] {168} E (77.4) [43] {186}
Southbound Approach D (45.4) [72] {233} C (21.7) [28] {120}
14: Pembroke Dr/Museum St & Hilton Pkwy (signal)
Overall Intersection B (18.7) C (33.7)
Eastbound Approach B (12.6) [134] {991} B (14.3) [76] {754}
Westbound Approach B (12.7) [39] {443} D (42.4) [645] {1261}
Northbound Approach E (72.0) [84] {274} E (69.4) [93] {310}
Southbound Approach D (37.3) [<25] {91} D (42.2) [<25] {115}
15: Central Ave & Hilton Pkwy (un-signalized)
Eastbound Left Turn A (8.5) [<25] {<25} F (55.9) [<25] {50}
Westbound Left Turn C (16.5) [<25] {<25} A (9.7) [<25] {<25}
Northbound Right Turn C (21.6) [<25] {27} B (12.4) [<25] {32}
Southbound Right Turn B (11.3) [<25] {41} F (165.1) [<25] {65}
16: Hatton Pl/Merchant St & Hilton Pkwy (un-signalized)
Northbound Right Turn B (11.5) [<25] {25} A (7.7) [<25] {61}
Southbound Right Turn B (10.6) [<25] {46} F (93.1) [<25] {72}
17: Indigo Run Dr/Whooping Crane Way & Hilton Pkwy (signal)
Overall Intersection C (23.3) D (44.1)
Eastbound Approach B (18.9) [115] {848} C (30.6) [116] {772}
Westbound Approach B (15.3) [40] {333} D (44.8) [592] {1536}
Northbound Approach D (54.0) [29] {103} E (58.6) [46] {190}
Southbound Approach D (49.7) [52] {187} E (73.4) [83] {324}
13
14
17
15
16
Page 66 of 112
2023 Existing Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un-signalized)
Eastbound Approach A (9.1) [<25] {45} B (10.9) [<25] {61}
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (3.7) [<25] {63} A (2.1) [<25] {60}
Southbound Left Turn A (8.8) [<25] {47} B (10.6) [<25] {77}
Southbound Right Turn A (6.1) [<25] {80} A (7.9) [<25] {110}
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (1.3) [<25] {36} A (1.4) [<25] {<25}
Northbound Left Turn B (10.8) [<25] {69} C (21.3) [31] {193}
Northbound Right Turn A (6.0) [<25] {94} A (7.0) [46] {218}
18
Honey Horn Rd
19
20
Page 67 of 112
2023 Existing Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed E (40.7) [<25] {33}
Eastbound Right Turn B (14.3) [<25] {25} B (12.5) [<25] {31}
Northbound Left Turn A (9.0) [<25] {<25} A (7.1) [<25] {34}
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (13.2) B (16.9)
Eastbound Approach C (33.3) [52] {191} C (32.0) [37] {175}
Westbound Approach B (18.8) [<25] {106} C (23.2) [56] {261}
Northbound Approach B (10.5) [29] {261} B (15.7) [92] {612}
Southbound Approach B (10.9) [94] {873} B (14.2) [67] {606}
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach C (17.1) [<25] {50} C (18.1) [<25] {52}
Southbound Left Turn A (3.2) [<25] {<25} B (13.2) [<25] {<25}
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach C (18.0) [<25] {53} C (17.4) [<25] {53}
Southbound Left Turn A (4.0) [<25] {37} A (7.5) [<25] {<25}
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn D (27.5) [<25] {<25} D (30.0) [<25] {35}
Westbound Right Turn A (8.4) [<25] {58} B (13.1) [<25] {68}
Southbound Left Turn A (3.6) [<25] {40} B (11.0) [<25] {26}
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn D (30.6) [<25] {27} D (32.8) [<25] {39}
Westbound Right Turn A (8.8) [<25] {63} B (11.4) [<25] {75}
Southbound Left Turn A (4.3) [<25] {98} B (11.9) [<25] {<25}
22
23
24
25
26
21Bay Pines Rd
Page 68 of 112
2023 Existing Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection B (16.0) B (17.6)
Eastbound Approach C (33.3) [<25] {110} D (41.8) [62] {248}
Westbound Approach D (37.1) [35] {151} C (29.4) [38] {149}
Northbound Approach A (9.7) [28] {214} B (13.3) [71] {508}
Southbound Approach B (15.4) [287] {1309} B (13.9) [99] {742}
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn F (184.7) [<25] {50} F (65.5) [<25] {75}
Westbound Right Turn A (9.1) [<25] {84} B (13.1) [<25] {110}
Southbound Left Turn B (10.4) [112] {512} B (12.5) [<25] {383}
29: Palmetto Bay Rd & Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection E (37.0) F (51.8)
Eastbound Approach F (208.4) [615] {814} F (51.0) [285] {770}
Westbound Approach A (7.5) [<25] {263} F (168.3) [1635] {1658}
Northbound Approach A (4.2) [<25] {223} D (30.8) [228] {738}
Southbound Approach B (12.9) [194] {461} A (8.4) [85] {460}
27
28
29
Page 69 of 112
2045 No Build VISSIM Results
Page 70 of 112
2045 No Build Traffic Volumes
1
2
4
3
• 0.56% Annual Growth Rate Applied
1
AM Peak Hour Volumes PM Peak Hour Volumes
84
2
5 18
493
731
12
32
263
994
28
Bluffton Pkwy
Buckingham
Plantation Dr
2
US 278
Buckingham
Plantation Dr
3
88
0
9 97
1226
70
0
51
9
2026
2
US 278
Salt Marsh Dr
4
1314
516
17
2083
3
US 278
Fording
Island Rd Ext
1
112
14
2 11
1044
2327
14
29
100
739
25
Bluffton Pkwy
Buckingham
Plantation Dr
2
138
41
76 51
2252
2457
45
23
106
1629
63
US 278
Buckingham
Plantation Dr
3
88
0
6 63
2239
320
0
45
27
1692
9
US 278
Salt Marsh Dr
4
US 278
Fording
Island Rd Ext
77
28
47 26
1265
2333
68
192
70
1798
40
2311
1823
23
1716
27
Page 71 of 112
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0
0
0 0
1837
00
0
2
2
3124
51 3
1818
3416
0
453098
36
6
1848
7
5
7
3136
6
1835
02
11
3123
3
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
11
0
5 7
3394
22
0
7
5
2499
50 6
3364
5736
0
592482
34
11
3416
11
7
11
2530
6
3398
25
14
2502
9
US 278
Blue Heron
Point Rd
Page 72 of 112
9
10
11
12
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
9
AM Peak Hour Volumes PM Peak Hour Volumes
240
0
51 49
1612
22
0
6
176
2963
2
US 278
Squire Pope
Rd
11
14
79
144 63
1449
80137
49
137
49
2806
165
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
23
1577
86
3020104
202
240 214
876
2189
163
328
174
1727
7
9
386
2
46 64
3039
22
28
2
251
2253
33
US 278
Squire Pope
Rd
11
37
88
70 95
2837
35293
53
68
58
2113
130
US 278
Spanish Wells
Rd
12
US 278
Gumtree Rd
10
US 278
Old Wild
Horse Rd
73
3094
11
2301121
207
274 369
1745
220253
234
313
141
1204
26
Page 73 of 112
13
14
17
15
16
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
13
AM Peak Hour Volumes PM Peak Hour Volumes
205
31
276 341
1077
226
51
0
286
1932
77
US 278
Jarvis Park
15
23 23
1125
6
6
6
1895
6
US 278
Central Ave
16
US 278
Hatton Pl
14
US 278
Pembroke Dr
11 46
1143
121797
104 51
14
20 35
1076
37293
24
42
90
1845
273
17
US 278
Indigo Run Dr
126
77
242 188
973
3790
58
37
146
1601
62
13
278
9
97 72
1993
563
9
11
128
1608
55
US 278
Jarvis Park
15
6 24
1715
6
11
6
1468
6
US 278
Central Ave
16
US 278
Hatton Pl
14
US 278
Pembroke Dr
11 11
1734
661473
6 58
30
16 31
1655
35357
39
42
64
1422
230
17
US 278
Indigo Run Dr
126
130
284 344
1547
5872
130
55
185
1301
53
Page 74 of 112
2045 No Build Traffic Volumes
18
AM Peak Hour Volumes PM Peak Hour Volumes
7
422
2
0
Honey Horn Rd
Cross Island Pkwy SB
20
89
20880
66
142
138
Marshland Rd
Cross Island
Pkwy NB
19
Marshland Rd
Cross Island
Pkwy SB158
130
41
0
26
254
274
18
Honey Horn Rd
19
20
18
9
449
45
17
Honey Horn Rd
Cross Island Pkwy SB
20
42
345285
161
54
162
Marshland Rd
Cross Island
Pkwy NB
19
Marshland Rd
Cross Island
Pkwy SB475
155
88
2
69
147
153
• 0.56%
Annual
Growth
Rate
Applied
Page 75 of 112
22
23
21Bay Pines Rd
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
21
AM Peak Hour Volumes PM Peak Hour Volumes
0
1938
7
1018
0
0
Bay Pines Rd
Palmetto Bay
22
Arrow Rd
Palmetto Bay
23
1813
18 6
6842
8
Genesta St
Palmetto Bay
60
1632
252 135
12
4350
760
38
130
17
156
21
11
1486
21
1947
11
11
Bay Pines Rd
Palmetto Bay
22
Arrow Rd
Palmetto Bay
23
1343
6 6
61737
5
Genesta St
Palmetto Bay
98
1201
198 371
41
43136
1521
86
76
33
105
Page 76 of 112
24
25
26
Bay Pines Rd
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
AM Peak Hour Volumes PM Peak Hour Volumes
24
6
6842
0
1791
28
Palmetto
Business Park
Palmetto Bay
25
6
6836
23
1752
45
Bow Cir
Palmetto Bay
26
6
11853
26
1702
56
Archer Rd
Palmetto Bay
24
11
61731
6
1343
6
Palmetto
Business Park
Palmetto Bay
25
11
111726
11
1338
11
Bow Cir
Palmetto Bay
26
11
111726
11
1338
11
Archer Rd
Palmetto Bay
Page 77 of 112
27
28
29
2045 No Build Traffic Volumes
• 0.56% Annual Growth Rate Applied
27
AM Peak Hour Volumes PM Peak Hour Volumes
98
1449
166 60
38
11062
767
28
52
19
52
Target Rd
Palmetto Bay
28
Dunnagans
Alley
Palmetto Bay
29
526
778
179 181
285
20741
425
200
297
149
57
Green wood
Palmetto Bay
1472
139 7
11
850
53
27
60
1225
64 126
50
88126
1417
52
194
50
86
Target Rd
Palmetto Bay
28
Dunnagans
Alley
Palmetto Bay
29
Green wood
Palmetto Bay
1388
11 69
32
1526
11
547
754
119 433
392
13662
699
401
405
200
205
Page 78 of 112
2045 No Build Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection C (22.3) B (15.9)
Eastbound Approach C (26.6) [123] {700} B (18.5) [43] {241}
Westbound Approach B (14.0) [<25] {168} B (14.4) [32] {218}
Northbound Approach B (14.1) [<25] {68} B (14.5) [<25] {53}
Southbound Approach A (6.6) [<25] {56} A (8.5) [<25] {83}
2: Buckingham Plantation Dr/Moss Creek Dr & Hilton Pkwy (signal)
Overall Intersection E (74.1) B (18.6)
Eastbound Approach F (146.0) [1628] {1658} B (16.6) [86] {567}
Westbound Approach B (14.1) [37] {302} B (18.4) [86] {474}
Northbound Approach C (26.4) [25] {186} D (39.3) [<25] {91}
Southbound Approach D (35.8) [<25] {88} C (24.4) [<25] {119}
3: Salt Marsh Dr/Moss Creek Village & Hilton Pkwy (un-signalized)
Eastbound Left Turn F (54.8) [1075] {1304} C (18.8) [<25] {55}
Westbound Left Turn F (4,646.8) [142] {214} B (12.4) [<25] {45}
Northbound Approach B (12.3) [<25] {63} A (7.4) [<25] {62}
Southbound Approach D (29.4) [49] {107} A (8.1) [<25] {77}
4: Fording Island Rd Ext & Hilton Pkwy (un-signalized)
Westbound Left Turn F (3,675.2) [85] {146} C (19.0) [<25] {34}
Northbound Approach F (3,448.2) [171] {189} C (18.4) [<25] {43}
1
2
4
3
2045 No Build Analysis includes a 0.56% annual growth rate as well as signal timing optimizations
Page 79 of 112
2045 No Build Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
5: Boat Landing Driveway/Wildlife Refuge Driveway & Hilton Pkwy (un-signalized)
Eastbound Left Turn C (20.9) [902] {1658} D (26.6) [<25] {<25}
Westbound Left Turn No volumes observed C (21.4) [<25] {<25}
Northbound Approach F (426.9) [<25] {38} C (20.6) [<25] {47}
Southbound Approach No volumes observed C (17.5) [<25] {42}
6: Blue Heron Point Rd & Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed F (131.6) [<25] {<25}
Northbound Approach F (2,505.2) [214] {351} E (49.9) [<25] {74}
7: Crosstree Dr (Windmill Harbour) & Hilton Pkwy (signal)
Overall Intersection A (9.5) B (13.4)
Eastbound Approach B (11.3) [433] {1093} B (10.6) [216] {1092}
Westbound Approach A (5.3) [26] {601} A (6.0) [86] {913}
Northbound Approach D (41.6) [<25] {138} F (237.4) [193] {326}
Southbound Approach A (9.8) [<25] {<25} A (0.0) [<25] {<25}
8: Jenkins Rd & Hilton Pkwy (un-signalized)
Eastbound Left Turn B (14.4) [<25] {<25} D (32.0) [<25] {33}
Southbound Approach D (29.2) [<25] {47} E (43.5) [<25] {62}
Jenkins Rd
5
7
6
8
Crosstree Dr
Page 80 of 112
2045 No Build Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection C (26.8) E (70.7)
Eastbound Approach D (38.4) [361] {1332} B (13.9) [235] {1106}
Westbound Approach A (8.4) [55] {700} F (128.0) [1018] {1383}
Northbound Approach C (21.2) [<25] {42} E (67.4) [<25] {73}
Southbound Approach B (19.2) [<25] {189} F (80.3) [228] {693}
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach A (1.4) [<25] {26} A (8.0) [<25] {29}
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection C (30.3) F (328.8)
Eastbound Approach C (25.2) [169] {787} B (15.1) [98] {668}
Westbound Approach B (15.5) [80] {365} F (637.7) [896] {989}
Northbound Approach E (63.1) [122] {407} F (510.5) [1241] {1288}
Southbound Approach F (147.4) [192] {319} D (49.1) [51] {243}
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection D (51.9) E (76.0)
Eastbound Approach D (43.1) [838] {1562} D (50.4) [254] {711}
Westbound Approach C (31.2) [128] {375} E (76.3) [1203] {1623}
Northbound Approach D (38.8) [166] {334} F (92.7) [280] {356}
Southbound Approach F (143.1) [1039] {1452} F (121.3) [657] {1380}
9
10
11
12
Page 81 of 112
2045 No Build Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
13: Jarvis Park Rd/Wilborn Rd & Hilton Pkwy (signal)
Overall Intersection C (22.3) C (33.4)
Eastbound Approach B (17.7) [169] {962} B (12.6) [51] {552}
Westbound Approach C (21.5) [106] {673} D (42.5) [907] {1289}
Northbound Approach E (67.4) [42] {178} F (281.4) [153] {297}
Southbound Approach D (36.9) [65] {225} C (25.8) [32] {153}
14: Pembroke Dr/Museum St & Hilton Pkwy (signal)
Overall Intersection C (22.1) E (55.1)
Eastbound Approach B (17.8) [227] {1081} B (18.9) [99] {679}
Westbound Approach B (19.5) [72] {553} D (54.5) [998] {1279}
Northbound Approach D (52.8) [71] {260} F (260.2) [397] {719}
Southbound Approach C (31.1) [<25] {87} D (43.2) [<25] {114}
15: Central Ave & Hilton Pkwy (un-signalized)
Eastbound Left Turn B (13.4) [<25] {<25} C (21.6) [87] {146}
Westbound Left Turn C (22.4) [<25] {25} C (21.8) [<25] {<25}
Northbound Right Turn C (16.2) [<25] {29} B (12.6) [<25] {31}
Southbound Right Turn B (12.3) [<25] {44} F (2,448.4) [87] {171}
16: Hatton Pl/Merchant St & Hilton Pkwy (un-signalized)
Northbound Right Turn A (8.1) [<25] {<25} A (6.9) [<25] {64}
Southbound Right Turn B (11.0) [<25] {36} F (1,211.0) [123] {244}
17: Indigo Run Dr/Whooping Crane Way & Hilton Pkwy (signal)
Overall Intersection C (24.5) E (66.7)
Eastbound Approach B (19.7) [107] {764} C (34.5) [115] {636}
Westbound Approach B (17.3) [53] {371} E (75.8) [1341] {1658}
Northbound Approach E (55.2) [32] {110} E (76.4) [65] {265}
Southbound Approach D (47.7) [57] {203} F (126.4) [327] {1023}
13
14
17
15
16
Page 82 of 112
2045 No Build Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un-signalized)
Eastbound Approach A (9.7) [<25] {45} B (12.1) [<25] {72}
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (4.5) [<25] {62} A (2.4) [<25] {67}
Southbound Left Turn A (9.8) [<25] {53} B (11.1) [<25] {79}
Southbound Right Turn A (6.1) [<25] {86} A (7.9) [<25] {112}
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (1.6) [<25] {49} A (1.5) [<25] {<25}
Northbound Left Turn B (11.9) [<25] {77} D (27.8) [46] {252}
Northbound Right Turn A (6.0) [<25] {102} A (8.0) [62] {277}
18
Honey Horn Rd
19
20
Page 83 of 112
2045 No Build Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed E (48.5) [<25] {35}
Eastbound Right Turn C (15.6) [<25] {<25} B (13.9) [<25] {32}
Northbound Left Turn B (12.8) [<25] {<25} A (7.8) [<25] {31}
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (14.0) B (18.2)
Eastbound Approach C (30.2) [51] {187} C (29.0) [38] {164}
Westbound Approach B (17.3) [<25] {108} C (28.2) [79] {337}
Northbound Approach B (12.4) [38] {311} B (15.5) [94] {596}
Southbound Approach B (11.6) [91] {737} B (16.3) [90] {601}
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach E (41.7) [<25] {57} D (25.4) [<25] {53}
Southbound Left Turn A (5.5) [37] {255} A (8.8) [<25] {<25}
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach F (65.1) [<25] {75} C (21.0) [<25] {59}
Southbound Left Turn A (5.7) [35] {176} B (12.8) [<25] {<25}
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn F (69.4) [46] {98} E (40.7) [<25] {48}
Westbound Right Turn A (9.1) [59] {131} B (13.1) [<25] {81}
Southbound Left Turn C (16.2) [551] {1040} B (14.1) [<25] {67}
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn F (1,234.0) [40] {69} D (31.8) [<25] {34}
Westbound Right Turn B (11.6) [62] {105} B (11.5) [<25] {70}
Southbound Left Turn C (16.2) [228] {469} B (12.0) [<25] {28}
22
23
24
25
26
21Bay Pines Rd
Page 84 of 112
2045 No Build Results (VISSIM)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] {Max Queue, ft}
AM Peak Hour PM Peak Hour
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection C (26.9) B (18.6)
Eastbound Approach C (26.5) [<25] {105} D (37.6) [62] {250}
Westbound Approach C (34.2) [32] {157} C (26.1) [38] {144}
Northbound Approach B (12.5) [39] {235} B (15.4) [83] {522}
Southbound Approach C (33.5) [1209] {1511} B (15.6) [129] {820}
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn F (872.0) [62] {148} F (87.7) [<25] {97}
Westbound Right Turn E (36.3) [88] {182} B (13.0) [30] {132}
Southbound Left Turn C (20.8) [258] {513} B (13.1) [<25] {416}
29: Palmetto Bay Rd & Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection F (60.5) F (81.8)
Eastbound Approach F (314.7) [808] {838} F (168.2) [805] {838}
Westbound Approach B (14.3) [56] {434} F (200.4) [1645] {1658}
Northbound Approach A (4.2) [<25] {207} F (61.1) [534] {794}
Southbound Approach C (34.4) [297] {461} A (8.2) [88] {460}
27
28
29
Page 85 of 112
2045 No Build Synchro Results
Page 86 of 112
2045 No Build Results (Synchro)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (17.6) C (25.5)
Eastbound Approach B (15.1) [298] <0.54> B (16.0) [207] <0.50>
Westbound Approach C (25.4) [202] <0.38> D (36.7) [#496] <0.86>
Northbound Approach B (15.9) [37] <0.08> B (15.7) [30] <0.11>
Southbound Approach A (9.9) [m23] <0.18> A (6.1) [m21] <0.23>
2: Buckingham Plantation Dr/Moss Creek Dr & Hilton Pkwy (signal)
Overall Intersection B (18.2) C (26.9)
Eastbound Approach B (16.9) [443] <0.64> B (17.1) [345] <0.75>
Westbound Approach B (17.9) [290] <0.51> C (28.1) [#644] <0.89>
Northbound Approach C (21.2) [98] <0.56> D (49.7) [m#76] <0.74>
Southbound Approach C (31.2) [70] <0.45> E (60.9) [#123] <0.88>
3: Salt Marsh Dr/Moss Creek Village & Hilton Pkwy (un-signalized)
Eastbound Left Turn C (18.8) [<25] <0.03> F (65.8) [33] <0.33>
Westbound Left Turn E (44.8) [<25] <0.08> D (34.9) [<25] <0.22>
Northbound Approach D (34.4) [33] <0.31> D (26.7) [30] <0.30>
Southbound Approach F (57.0) [88] <0.63> F (649.6) [273] <2.05>
4: Fording Island Rd Ext & Hilton Pkwy (un-signalized)
Westbound Left Turn C (21.6) [<25] <0.02> C (17.0) [<25] <0.06>
Northbound Approach F (684.9) [115] <1.63> F ($1880.2) [225] <4.10>
1
2
4
3
2045 No Build Analysis includes a 0.56% annual growth rate as well as signal timing optimizations
Page 87 of 112
2045 No Build Results (Synchro)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
5: Boat Landing Driveway/Wildlife Refuge Driveway & Hilton Pkwy (un-signalized)
Eastbound Left Turn C (17.8) [<25] <0.01> F (67.3) [<25] <0.08>
Westbound Left Turn No volumes observed C (28.7) [<25] <0.01>
Northbound Approach F (50.7) [<25] <0.03> D (32.3) [<25] <0.09>
Southbound Approach No volumes observed F (74.9) [<25] <0.26>
6: Blue Heron Point Rd & Hilton Pkwy (un-signalized)
Westbound Left Turn No volumes observed D (30.2) [<25] <0.01>
Northbound Approach F ($1763.6) [73] <2.35> F ($5024.3) [145] <8.33>
7: Crosstree Dr (Windmill Harbour) & Hilton Pkwy (signal)
Overall Intersection E (67.8) F (92.1)
Eastbound Approach F (105.5) [#2262] <1.19> C (33.3) [#1547] <1.00>
Westbound Approach A (5.9) [320] <0.64> F (133.8) [~2456] <1.26>
Northbound Approach B (14.6) [34] <0.39> E (77.5) [#106] <0.86>
Southbound Approach 0 (0.0) [<25] <0.01> 0 (0.0) [<25] <0.00>
8: Jenkins Rd & Hilton Pkwy (un-signalized)
Eastbound Left Turn C (18.3) [<25] <0.03> F (91.5) [<25] <0.22>
Southbound Approach F ($1398.4) [65] <1.86> F (151.3) [73] <.69>
Jenkins Rd
5
7
6
8
Crosstree Dr
Page 88 of 112
2045 No Build Results (Synchro)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection C (23.4) F (144.6)
Eastbound Approach B (15.2) [918] <0.81> B (12.6) [370] <0.91>
Westbound Approach C (31.1) [625] <0.74> F (233.2) [m#2394] <1.49>
Northbound Approach B (13.0) [<25] <0.02> E (70.6) [67] <0.29>
Southbound Approach E (69.0) [#286] <0.92> F (231.6) [#577] <1.46>
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach D (26.7) [40] <0.36> F (77.9) [<25] <0.20>
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection D (37.5) D (45.1)
Eastbound Approach D (38.7) [#1280] <1.02> C (20.5) [381] <0.89>
Westbound Approach C (24.0) [345] <0.91> D (45.2) [m909] <0.99>
Northbound Approach D (51.5) [214] <0.60> F (171.7) [#606] <1.35>
Southbound Approach F (94.1) [#306] <0.97> D (49.3) [168] <0.34>
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection F (84.2) F (80.1)
Eastbound Approach F (94.6) [~1146] <1.16> D (54.0) [#842] <0.99>
Westbound Approach D (43.1) [#391] <0.90> D (44.6) [m539] <0.97>
Northbound Approach F (113.6) [#372] <1.13> F (137.9) [#466] <1.29>
Southbound Approach F (119.0) [#473] <1.09> F (178.8) [#506] <1.33>
9
10
11
12
Page 89 of 112
2045 No Build Results (Synchro)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
13: Jarvis Park Rd/Wilborn Rd & Hilton Pkwy (signal)
Overall Intersection C (20.2) E (57.5)
Eastbound Approach B (16.0) [257] <0.90> A (7.6) [m262] <0.76>
Westbound Approach B (12.0) [306] <0.69> D (38.2) [#1335] <1.01>
Northbound Approach F (82.7) [136] <0.58> F (259.8) [#208] <1.33>
Southbound Approach D (52.5) [249] <0.73> F (250.2) [#358] <1.61>
14: Pembroke Dr/Museum St & Hilton Pkwy (signal)
Overall Intersection C (27.8) D (38.3)
Eastbound Approach B (15.6) [#1252] <0.91> B (13.7) [351] <0.71>
Westbound Approach D (36.7) [681] <0.55> D (47.7) [1072] <0.89>
Northbound Approach E (73.6) [254] <0.76> F (86.1) [#355] <0.89>
Southbound Approach C (32.7) [74] <0.36> D (49.5) [93] <0.68>
15: Central Ave & Hilton Pkwy (un-signalized)
Eastbound Left Turn B (11.4) [<25] <0.01> B (17.2) [<25] <0.02>
Westbound Left Turn C (18.7) [<25] <0.02> B (13.6) [<25] <0.01>
Northbound Right Turn C (21.0) [<25] <0.03> C (15.9) [<25] <0.04>
Southbound Right Turn B (13.8) [<25] <0.06> C (19.5) [<25] <0.03>
16: Hatton Pl/Merchant St & Hilton Pkwy (un-signalized)
Northbound Right Turn C (17.6) [<25] <0.04> C (16.1) [<25] <0.17>
Southbound Right Turn B (12.7) [<25] <0.02> C (17.5) [<25] <0.04>
17: Indigo Run Dr/Whooping Crane Way & Hilton Pkwy (signal)
Overall Intersection B (18.0) D (36.4)
Eastbound Approach A (3.5) [<25] <0.79> B (16.9) [#297] <0.93>
Westbound Approach B (19.2) [407] <0.51> D (38.4) [#951] <0.92>
Northbound Approach E (62.2) [112] <0.52> E (70.5) [#245] <0.82>
Southbound Approach D (54.9) [178] <0.71> E (67.7) [212] <0.86>
13
14
17
15
16
Page 90 of 112
2045 No Build Results (Synchro)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
18: Cross Island Pkwy SB Ramp/Gumtree Rd & Honey Horn Rd (un-signalized)
Eastbound Approach B (11.5) [<25] <0.00> B (13.8) [<25] <0.19>
19: Cross Island Pkwy SB Ramp & Marshland Rd (un-signalized)
Westbound Left Turn A (9.1) [<25] <0.14> A (8.6) [<25] <0.17>
Southbound Left Turn C (19.7) [<25] <0.1> E (49.9) [58] <0.49>
Southbound Right Turn A (9.4) [<25] <0.05> B (14.1) [<25] <0.19>
20: Cross Island Pkwy NB Ramp & Marshland Rd (un-signalized)
Eastbound Left Turn A (8.3) [<25] <0.12> A (8.6) [<25] <0.06>
Northbound Left Turn C (16.2) [<25] <0.21> D (34.1) [160] <0.75>
Northbound Right Turn A (9.4) [<25] <0.08> B (10.6) [<25] <0.23>
18
Honey Horn Rd
19
20
Page 91 of 112
2045 No Build Results (Synchro)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
21: Palmetto Bay Rd & Bay Pines Rd (un-signalized)
Eastbound Left Turn No volumes observed F ($454) [50] <0.74>
Eastbound Right Turn C (21.7) [<25] <0.03> C (16.5) [<25] <0.04>
Northbound Left Turn C (19.4) [<25] <0.03> B (14.5) [<25] <0.06>
22: Palmetto Bay Rd & Point Comfort Rd/Arrow Rd (signal)
Overall Intersection B (17.1) C (26.9)
Eastbound Approach D (46.0) [171] <0.71> C (24.5) [102] <0.35>
Westbound Approach C (23.8) [73] <0.44> E (55.3) [#376] <0.94>
Northbound Approach A (9.7) [136] <0.37> C (21.7) [443] <0.86>
Southbound Approach B (15.2) [670] <0.73> C (24.3) [434] <0.88>
23: Palmetto Bay Rd & Genesta St (un-signalized)
Westbound Approach E (46.3) [<25] <0.13> F (159.5) [30] <0.37>
Southbound Left Turn B (10.0) [<25] <0.02> C (16.8) [<25] <0.02>
24: Palmetto Bay Rd & Palmetto Business Park Rd (un-signalized)
Westbound Approach E (47.3) [<25] <0.13> F (114.3) [33] <0.37>
Southbound Left Turn B (10.1) [<25] <0.04> C (16.7) [<25] <0.02>
25: Palmetto Bay Rd & Bow Cir (un-signalized)
Westbound Left Turn D (27.7) [<25] <0.04> F (54.8) [<25] <0.14>
Westbound Right Turn B (11.6) [<25] <0.01> C (19.0) [<25] <0.04>
Southbound Left Turn B (10.3) [<25] <0.07> C (16.7) [<25] <0.04>
26: Palmetto Bay Rd & Archer Rd (un-signalized)
Westbound Left Turn D (29.0) [<25] <0.07> F (54.8) [<25] <0.14>
Westbound Right Turn B (11.7) [<25] <0.01> C (19.0) [<25] <0.04>
Southbound Left Turn B (10.5) [<25] <0.08> C (16.7) [<25] <0.04>
22
23
24
25
26
21Bay Pines Rd
Page 92 of 112
2045 No Build Results (Synchro)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
27: Palmetto Bay Rd & Target Rd (signal)
Overall Intersection B (10.8) B (18.7)
Eastbound Approach C (33.2) [81] <0.31> D (51.4) [241] <0.82>
Westbound Approach D (48.8) [152] <0.69> C (30.4) [115] <0.50>
Northbound Approach B (10.9) [240] <0.37> B (19.0) [585] <0.72>
Southbound Approach A (4.6) [149] <0.69> A (7.3) [233] <0.66>
28: Palmetto Bay Rd & Dunnagans Alley (un-signalized)
Westbound Left Turn D (33.5) [<25] <0.09> F (55.4) [<25] <0.33>
Westbound Right Turn B (12.0) [<25] <0.02> C (20.0) [<25] <0.24>
Southbound Left Turn B (11.5) [<25] <0.21> B (14.6) [<25] <0.03>
29: Palmetto Bay Rd & Hilton Pkwy (Sea Pines Circle, RAB)
Overall Intersection F (56.0) F (60.3)
Eastbound Approach F (83.3) [375] <1.04> F (117.9) [550] 0.98>
Westbound Approach D (26.1) [200] <0.79> F (92.4) [425] <1.08>
Northbound Approach C (16.4) [125] <0.65> F (78.2) [525] <0.98>
Southbound Approach F (134.4) [900] <1.23> F (94.3) [675] <1.13>
27
28
29
Page 93 of 112
Preliminary 2045 Alternative 1 Results
Page 94 of 112
5
AM Peak Hour Volumes PM Peak Hour Volumes
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
0 0
1837
23124
78
0
5 9
1811
3418
0
56
7
3080
39
1854
3141
6
1837
3126
US 278
Blue Heron
Point Rd
Jenkins Rd
5
7
6
8
Crosstree Dr
5
US 278
Wildlife
Refuge
7
US 278
Crosstree Dr
8
US 278
Jenkins Rd
13 9
3394
122499
1011
1
7
17
3353
5741
1
73
11
2457
43
3427
2537
6
3405
2511
US 278
Blue Heron
Point Rd
Intersections removed and
traffic consolidated to
Crosstree Dr
2045 Alternative 1. Modified
Recommended Traffic
Volumes
Page 95 of 112
Preliminary 2045 Alternative 1 Results (SimTraffic)
1
2
4
3
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
1: Buckingham Plantation Dr & Bluffton Pkwy (signal)
Overall Intersection B (16.9) B (12.9)
Eastbound Approach B (16.2) [361] <0.54> A (8.7) [254] <0.50>
Westbound Approach C (20.4) [180] <0.38> B (12.1) [291] <0.86>
Northbound Approach B (17.1) [49] <0.08> D (47.7) [77] <0.11>
Southbound Approach A (7.2) [55] <0.18> C (27.1) [137] <0.23>
2: Buckingham Plantation Dr/Moss Creek Dr & Hilton Pkwy (signal)
Overall Intersection B (14.8) C (19.1)
Eastbound Approach B (13.1) [283] <0.64> B (14.0) [274] <0.75>
Westbound Approach B (13.9) [223] <0.51> C (21.1) [348] <0.89>
Northbound Approach C (24.5) [120] <0.56> D (38.2) [97] <0.74>
Southbound Approach C (24.4) [80] <0.45> D (27.4) [169] <0.88>
3: Salt Marsh Dr/Moss Creek Village & Hilton Pkwy (un-signalized)
Eastbound Left Turn C (18.9) [27] <0.04> F (65.8) [33] <0.33>
Westbound Left Turn E (44.8) [<25] <0.08> D (34.9) [<25] <0.22>
Northbound Approach B (14.2) [59] <0.31> C (11.4) [59] <0.30>
Southbound Approach B (17.0) [91] <0.63> F (173.4) [305] <2.05>
4: Fording Island Rd Ext & Hilton Pkwy (un-signalized)
Westbound Left Turn D (27.4) [<25] <0.06> B (17.7) [34] <0.13>
Northbound Approach E (37.7) [53] <0.58> F (99.8) [127] <1.26>
Page 96 of 112
Preliminary 2045 Alternative 1 Results (SimTraffic)
Jenkins Rd
5
7
Crosstree Dr
A
*Crazy Crab
Access to East
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
5: Boat Landing Driveway/Wildlife Refuge Driveway & Hilton Pkwy (un-signalized)
Northbound Right-Turn A (3.0) [<25] <0.00> A (1.3) [<25] <0.00>
Southbound Right-Turn No volumes observed A (2.9) [<25] <0.00>
6: Blue Heron Point Rd & Hilton Pkwy (un-signalized)
Intersection combined with Crosstree Dr
7: Crosstree Dr (Windmill Harbour) & Hilton Pkwy (signal)
Overall Intersection B (15.4) B (14.6)
Eastbound Approach B (18.6) [338] <0.82> B (11.6) [283] <0.70>
Westbound Approach A (8.4) [166] <0.45> B (19.6) [280] <0.92>
Northbound Approach D (52.9) [93] <0.35> E (60.4) [108] <0.72>
Southbound Approach C (31.0) [<25] <0.06> D (48.9) [30] <0.14>
8: Jenkins Rd & Hilton Pkwy (un-signalized)
Intersection combined with Crosstree Dr
A: The Crazy Crab & Hilton Pkwy (un-signalized)
Westbound Left-Turn F (169.2) [<25] <0.05> F (77.1) [<25] <0.02>
Northbound Right-Turn F (95.8) [<25] <0.02> E (39.3) [<25] <0.01>
Page 97 of 112
Preliminary 2045 Alternative 1 Results (SimTraffic)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection B (18.1) C (23.3)
Eastbound Approach B (13.3) [852] <0.75> B (11.1) [467] <0.71>
Westbound Approach A (3.2) [91] <0.48> B (18.0) [522] <0.97>
Northbound Approach E (70.6) [263] <0.07> F (84.1) [#464] <0.29>
Southbound Approach D (52.9) [151] <0.58> E (65.6) [281] <0.70>
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach C (17.0) [74] <0.36> E (43.2) [32] <0.20>
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection C (26.0) C (20.9)
Eastbound Approach B (11.7) [354] <0.99> B (10.1) [216] <0.85>
Westbound Approach A (8.7) [350] <0.91> C (28.3) [1107] <0.99>
Northbound Approach E (73.5) [459] <0.66> E (70.9) [#609] <0.95>
Southbound Approach E (58.6) [411] <0.76> E (57.7) [430] <0.77>
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection D (38.8) D (38.4)
Eastbound Approach C (32.3) [655] <0.77> C (31.3) [489] <0.93>
Westbound Approach D (40.4) [310] <0.75> D (43.6) [554] <0.97>
Northbound Approach E (57.4) [375] <0.41> D (54.5) [319] <0.93>
Southbound Approach E (60.8) [293] <0.87> E (74.3) [298] <0.90>
9
10
11
12
Page 98 of 112
Preliminary 2045 Alternative 2 Results
Page 99 of 112
9A
AM Peak Hour Volumes PM Peak Hour Volumes
1
292
1 1
1
14
1
225
1
1
1
1
Squire Pope
Rd
9
243
53 51
1612
178
572963
178
US 278
Squire Pope
Rd
9B
Squire Pope
Rd
10
US 278
Old Wild
Horse Rd
23
1577
86
3020 1
2
229
1
6
1
1
9A
1
435
1 1
1
14
1
341
1
1
1
1
Squire Pope
Rd
9
389
50 66
3039
279
482253
284
US 278
Squire Pope
Rd
9B
Squire Pope
Rd
10
US 278
Old Wild
Horse Rd
73
3094
11
2301 1
37
297
1
30
1
1
9
10
9A
9B
2045 Alternative 2. Bowties at
Spanish Wells and Squire
Pope Traffic Volumes
Page 100 of 112
11A
AM Peak Hour Volumes PM Peak Hour Volumes
1
237
217
1
261
1
1
Spanish Wells
Rd
11
151
303 143
1449
335
2812806
214
US 278
Spanish Wells
Rd
11B
Spanish
Wells Rd
1
324
193
1
423
1
1
Old Wild
Horse Rd
11A
1
195
328
1
206
1
1
Spanish Wells
Rd
11
330
193 130
2837
404
1382113
188
US 278
Spanish Wells
Rd
11B
Spanish
Wells Rd
1
253
128
1
414
1
1
Old Wild
Horse Rd
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
11
12
11A
11B
2045 Alternative 2. Bowties at
Spanish Wells and Squire
Pope Traffic Volumes
Page 101 of 112
Preliminary 2045 Alternative 2 Results (SimTraffic)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection B (16.3) B (13.6)
Eastbound Approach B (15.8) [394] <0.82> B (14.7) [301] <0.65>
Westbound Approach B (11.5) [253] <0.45> B (11.3) [507] <0.95>
Northbound Approach E (60.4) [277] <0.78> D (44.0) [535] <0.94>
Southbound Approach B (12.2) [87] <0.62> D (51.8) [369] <0.82>
9A: Squire Pope North Bowtie (Roundabout)
Overall Intersection A (4.5) A (5.5)
Eastbound Approach A (3.7) [<25] A (4.4) [<25]
Westbound Approach A (3.4) [<25] A (3.9) [<25]
Northbound Approach A (4.2) [25] A (5.1) [25]
Southbound Approach A (4.7) [25] A (5.9) [50]
9B: Chamberlin Dr South Bowtie (Roundabout)
Overall Intersection A (4.2) A (4.9)
Eastbound Approach A (3.4) [<25] A (3.8) [<25]
Northbound Approach A (3.5) [<25] A (4.0) [<25]
Southbound Approach A (4.2) [25] A (5.0) [25]
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach C (17.0) [80] <0.36> F (51.5) [33] <0.20>
9
10
9A
9B
Page 102 of 112
Preliminary 2045 Alternative 2 Results (SimTraffic)
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection C (23.7) C (21.2)
Eastbound Approach C (23.8) [519] <0.87> B (15.5) [348] <0.69>
Westbound Approach A (5.7) [118] <0.39> B (16.9) [357] <0.94>
Northbound Approach D (54.4) [486] <0.88> E (58.9) [560] <0.94>
Southbound Approach D (42.8) [369] <0.79> C (29.4) [245] <0.81>
11A: Wild Horse Rd North Bowtie (Roundabout)
Overall Intersection A (6.1) A (6.6)
Eastbound Approach A (4.4) [<25] A (4.7) [<25]
Northbound Approach A (6.3) [50] A (6.8) [50]
Southbound Approach A (5.7) [25] A (6.1) [25]
11B: Spanish Wells Rd South Bowtie (Roundabout)
Overall Intersection A (7.2) A (6.2)
Eastbound Approach A (4.7) [<25] A (4.0) [<25]
Northbound Approach A (7.9) [50] A (6.9) [50]
Southbound Approach A (6.6) [50] A (5.4) [25]
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection D (35.1) D (36.5)
Eastbound Approach D (40.2) [465] <0.88> C (29.7) [360] <0.93>
Westbound Approach B (19.4) [314] <0.41> D (32.9) [455] <0.97>
Northbound Approach C (32.2) [208] <0.75> D (44.2) [341] <0.93>
Southbound Approach E (57.8) [244] <0.86> E (57.9) [275] <0.90>
11
12
11A
11B
Page 103 of 112
Preliminary 2045 Alternative 3 Results
Page 104 of 112
AM Peak Hour Volumes PM Peak Hour Volumes
11A
11B
11B
US 278
Spanish Wells
Rd
US 278
Spanish Wells
Rd
11A
14
79
144 63
1449
80
137
49
137
49
2806
165
9B
US 278
Spanish Wells
Rd
US 278
Spanish Wells
Rd
11A
37
88
70 95
2837
35
293
53
68
58
2113
130
11B
12
2045 Alternative 3. Echelon at
Spanish Wells
Traffic Volumes
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
Page 105 of 112
Preliminary 2045 Alternative 3 Results (SimTraffic)
Echelon at Spanish Wells
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection B (11.2) C (20.4)
Eastbound Approach B (12.4) [236] <0.75> C (24.4) [478] <0.89>
Westbound Approach A (7.7) [159] <0.48> B (15.5) [332] <0.94>
Northbound Approach D (41.3) [29] <0.03> E (62.3) [77] <0.28>
Southbound Approach B (16.7) [102] <0.57> C (26.9) [274] <0.83>
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach A (4.2) [37] <0.36> A (4.8) [<25] <0.17>
11A: Wild Horse Rd & Hilton Pkwy (signal) - Echelon
Overall Intersection B (10.8) B (12.8)
Westbound Approach A (7.2) [134] <0.38> B (11.5) [249] <0.82>
Southbound Approach C (34.5) [138] <0.58> C (32.8) [131] <0.53>
11B: Spanish Wells Rd & Hilton Pkwy (signal) - Echelon
Overall Intersection B (18.3) B (12.4)
Eastbound Approach B (17.3) [474] <0.95> A (9.4) [288] <0.75>
Northbound Approach C (28.1) [147] <0.72> C (29.1) [233] <0.77>
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection D (44.6) D (44.2)
Eastbound Approach D (53.1) [449] <0.88> D (42.5) [406] <0.93>
Westbound Approach C (30.0) [479] <0.38> D (42.1) [824] <0.97>
Northbound Approach C (33.3) [213] <0.75> D (46.0) [356] <0.93>
Southbound Approach E (59.5) [239] <0.86> D (54.4) [274] <0.90>
9
10 11A 12
11B
Page 106 of 112
AM Peak Hour Volumes PM Peak Hour Volumes
9A
9B
9B
US 278
Squire Pope
Rd
US 278
Squire Pope
Rd
9A
241
0
51 49
1612
2
2
0
6
176
2963
2
9B
US 278
Squire Pope
Rd
US 278
Squire Pope
Rd
9A
387
2
46 64
3039
2
2
28
2
251
2253
33
9B
12
2045 Alternative 3. Echelon at
Squire Pope
Traffic Volumes
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
Page 107 of 112
Preliminary 2045 Alternative 3 Results (SimTraffic)
Echelon at Squire Pope
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9A: Squire Pope Rd & Hilton Pkwy (signal) - Echelon
Overall Intersection A (3.6) C (35.0)
Westbound Approach A (2.2) [57] <0.51> A (8.4) [258] <0.95>
Southbound Approach B (6.6) [156] <0.62> F (250.5) [858] <1.02>
9B: Chamberlin Dr & Hilton Pkwy (signal) - Echelon
Overall Intersection C (25.9) A (4.6)
Eastbound Approach C (25.9) [263] <0.66> A (4.1) [167] <0.54>
Northbound Approach C (26.9) [151] <0.05> D (37.9) [66] <0.19>
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach C (17.6) [85] <0.36> B (12.7) [<25] <0.17>
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection D (35.5) D (39.6)
Eastbound Approach D (45.0) [906] <0.99> B (17.4) [369] <0.67>
Westbound Approach B (11.8) [168] <0.69> D (52.5) [984] <0.93>
Northbound Approach D (43.2) [167] <0.51> E (67.8) [239] <0.90>
Southbound Approach E (61.3) [214] <0.98> D (47.1) [166] <0.37>
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection D (35.5) D (42.4)
Eastbound Approach D (44.9) [464] <0.87> D (35.6) [399] <0.87>
Westbound Approach B (17.1) [204] <0.41> D (42.8) [801] <0.83>
Northbound Approach C (28.7) [202] <0.75> D (43.3) [364] <0.89>
Southbound Approach D (52.7) [230] <0.77> E (55.1) [260] <0.77>
9A
10
11
129B
Page 108 of 112
AM Peak Hour Volumes PM Peak Hour Volumes
11A
11B
11B
14
79
63
1449
80
49
1372806
165
US 278
Spanish Wells
Rd
US 278
14
137
49
Spanish Wells
Rd
11A
11B
37
88
95
2837
35
53
682113
130
US 278
Spanish Wells
Rd
US 278
70
293
58
Spanish Wells
Rd
11A
11B
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
12
2045 Alternative 3. Center
Turn Overpass at Spanish
Wells Traffic Volumes
Page 109 of 112
Preliminary 2045 Alternative 3 Results (SimTraffic)
Center Turn Overpass at Spanish Wells
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection B (12.6) C (26.8)
Eastbound Approach B (11.4) [210] <0.75> D (39.0) [620] <0.81>
Westbound Approach B (14.5) [306] <0.48> B (16.3) [456] <0.96>
Northbound Approach D (49.0) [<25] <0.07> E (63.9) [64] <0.26>
Southbound Approach B (14.7) [99] <0.58> C (24.5) [292] <0.77>
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach B (13.6) [78] <0.36> E (46.6) [36] <0.20>
11A: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection B (12.9) A (8.8)
Eastbound Approach B (13.8) [346] <0.87> A (8.6) [271] <0.62>
Westbound Approach A (5.9) [139] <0.64> A (5.7) [135] <0.75>
Northbound Approach C (32.4) [209] <0.81> C (34.6) [146] <0.62>
Southbound Approach E (59.8) [146] <0.51> E (56.6) [186] <0.69>
11B: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal) – Center Turn Overpass
Overall Intersection B (19.1) B (17.9)
Eastbound Approach B (16.3) [58] <0.07> B (12.2) [55] <0.08>
Northbound Approach C (20.1) [102] <0.22> B (19.2) [176] <0.46>
Southbound Approach B (18.8) [32] <0.02> B (16.9) [68] <0.11>
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection D (36.7) D (35.4)
Eastbound Approach D (48.2) [465] <0.87> C (31.9) [347] <0.93>
Westbound Approach B (17.1) [337] <0.41> C (30.9) [571] <0.97>
Northbound Approach C (28.6) [203] <0.75> D (37.4) [286] <0.93>
Southbound Approach D (51.2) [234] <0.77> E (58.8) [249] <0.90>
9
10 12
11B
11A
Page 110 of 112
AM Peak Hour Volumes PM Peak Hour Volumes
9A
9B
9B
US 278
Squire Pope
Rd
US 278
Squire Pope
Rd
9A
14
79
144 63
1449
80
137
49
137
49
2806
165
9B
US 278
Squire Pope
Rd
US 278
Squire Pope
Rd
9A
37
88
70 95
2837
35
293
53
68
58
2113
130
9B
12
2045 Alternative 3. Center
Turn Overpass at Squire Pope
Traffic Volumes
12
US 278
Gumtree Rd
104
202
240 214
876
2189
163
328
174
1727
7
12
US 278
Gumtree Rd
121
207
274 369
1745
220100
234
313
141
1204
26
Page 111 of 112
Preliminary 2045 Alternative 3 Results (SimTraffic)
Center Turn Overpass at Squire Pope
Intersection & Movements LOS (Delay, sec) [95th Queue Length, ft] <v/c ratio>
AM Peak Hour PM Peak Hour
9A: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal)
Overall Intersection A (3.2) A (9.3)
Eastbound Approach A (3.5) [40] <0.78> A (4.8) [139] <0.64>
Westbound Approach A (2.0) [42] <0.43> A (7.4) [234] <0.93>
Northbound Approach D (37.3) [21] <0.05> E (68.1) [67] <0.11>
Southbound Approach A (6.1) [149] <0.77> D (48.3) [387] <0.89>
9B: Chamberlin Dr/Squire Pope Rd & Hilton Pkwy (signal) – Center Turn Overpass
Overall Intersection B (17.2) B (10.0)
Eastbound Approach B (15.9) [108] <0.21> A (3.9) [70] <0.65>
Westbound Approach B (10.6) [<25] <0.00> A (4.1) [<25] <0.95>
Northbound Approach B (18.8) [<25] <0.00> E (56.2) [<25] <0.94>
Southbound Approach C (21.8) [64] <0.10> D (40.9) [77] <0.82>
10: Old Wild Horse Rd & Hilton Pkwy (un-signalized)
Southbound Approach C (17.4) [77] <0.36> E (42.4) [29] <0.20>
11: Spanish Wells Rd/Wild Horse Rd & Hilton Pkwy (signal)
Overall Intersection C (32.4) C (31.3)
Eastbound Approach D (39.0) [771] <0.98> B (17.6) [369] <0.68>
Westbound Approach B (12.6) [149] <0.91> C (22.1) [446] <0.99>
Northbound Approach D (44.0) [162] <0.64> F (157.4) [766] <1.28>
Southbound Approach E (62.8) [220] <0.82> E (57.9) [152] <0.85>
12: Gumtree Rd & Hilton Pkwy (signal)
Overall Intersection D (35.8) D (36.4)
Eastbound Approach D (45.7) [473] <0.87> C (32.5) [387] <0.93>
Westbound Approach B (17.4) [263] <0.41> C (33.5) [651] <0.97>
Northbound Approach C (28.3) [199] <0.75> D (36.4) [277] <0.93>
Southbound Approach D (52.7) [228] <0.77> E (56.5) [262] <0.90>
9A
10
11
129B
Page 112 of 112
Source: Town of Hilton Head Island website. First collected Nov 20, 2026.