RecordWell Data

Agenda

City of Isle of Palms · Charleston County · meeting of Nov 18, 2026 · Agenda packets

Open the original document More from City of Isle of Palms

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PLANNING COMMISSION November 18, 2026 The public may view the public meeting at: 28TU28TUwww.youtube.com/user/cityofisleofpalmsU28TU28T Public Comment: Citizens may provide public comment here: https://www.isleofpalms.gov/public-comment-form AGENDA The Isle of Palms Planning Commission will hold its regular meeting on Wednesday, November 18, 2026, at 4:00 p.m. in Council Chambers of City Hall, 1207 Palm Boulevard. A. Call to order and acknowledgment that the press and the public were duly notified in accordance with state law. B. Approval of minutes- October 14, 2026 C. Discussion of identifying potential CHATS project candidate(s) based on Mobility Study D. Miscellaneous business E. Adjourn 1 Planning Commission Meeting 4:00pm, Wednesday, October 14, 2026 1207 Palm Boulevard, Isle of Palms, SC and broadcasted live on YouTube: https://www.youtube.com/user/cityofisleofpalms MINUTES 1. Call to Order Present: Ron Denton, Bill Laughlin, Sandy Stone, Tim Ahmuty, Sue Nagelski, Jeffrey Rubin, Rich Steinert Staff present: Administrator Kerr 2. Approval of minutes MOTION: Mr. Laughlin made a motion to approve the minutes of the September 9, 2026 meeting. Ms. Nagelski seconded the motion. The motion passed unanimously. 3. Discussion of commercial district parking requirements Commission members revisited their discussion and recommendations related to commercial parking district requirements in the GC-3 zoning district as requested by City Council. After a lengthy discussion about the unintended consequences of any change to the setbacks and parking requirements in the GC-3 district, the Commissioners made the following motions: MOTION: Mr. Stone made a motion to reduce the setbacks on JC Long Boulevard to 0’. Dr. Rubin seconded the motion. A vote was taken as follows: Ayes: Stone, Rubin, Steinert, Laughlin, Ahmuty, Denton Nays: Nagelski The motion passed 6-1. MOTION: Mr. Stone made a motion to reduce the setbacks on Pavilion Drive from 25’ to 10’. Dr. Rubin seconded the motion. The motion passed unanimously. MOTION: Mr. Stone made a motion eliminate further residential development in the GC-3 zoning district. Dr. Rubin seconded the motion. The motion passed unanimously. The Planning Commission stated their previously recommended 25% parking requirement reduction stands as is. Planning Commission, 10/14/2026 4. Miscellaneous The next meeting of the Planning Commission will be Wednesday, November 4, 2026 at 4:00pm. 5. Adjournment Mr. Denton made a motion to adjourn, and Mr. Stone seconded the motion. The meeting was adjourned at 5:27pm. Respectfully submitted, Nicole DeNeane City Clerk Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 1 of 20 Contents 2 3 4 4 5 5 6 6 7 7 8 8 9 10 Contents PART 1: PROJECT INFORMATION 1A: Applicant Information 1B: Project Type 1C: Relevant Plans & Policies 1D: Project Location 1E: Existing Conditions 1F: Future Conditions 1G: Proposed Project & Need 1H: Past Performance 1I: Right-of-Way Impacts 1J: Completed Project Phases 1K: Remaining Project Schedule 1L: Maintenance 1M: Estimated Costs 1N: Matching Funds___________ PART 2: EVALUATION CRITERIA 12 13 2A: Accessibility 2B: Economic__ 2C: Connectivity 14 2D: Safety 15 2E: Engagement 16 2F: Certification_______ 17 Project Scoring & Selection______ 18 ------------------------------------------------------------------- FFY 26-27 Timeline (subject to change) 10/28/26 - Call for Applications open 09/02/26 - Part 1 Webinar (2:00-3:00 PM) 01/13/27 - Part 1 Question Deadline (4:00 PM) 02/10/27 - Part 1 deadline (4:00 PM) 03/03/27 - Part 2 invitations shared 03/10/27 - Part 2 Webinar (2:00-3:00 PM) 03/31/27 - Part 2 deadline (4:00 PM) 04/15/27 - Presentations (10:00 AM-12:00 PM) TBD - CHATS award recommendations TBD - SCDOT award letter Estimated Total Funding Available FFY 26-27: $1,100,000 (subject to change) Project Award Size FFY 26-27 Min. Award Max. Award* Infrastructure $300,000 $1,100,000 Non-Infrastructure $25,000 $300,000 Instructions To fill in this application, please open the PDF in Adobe Acrobat, which can be downloaded for free at: get.adobe.com/reader/ This application is divided into two parts with separate deadlines for each. Please submit Part 1 and 2 applications and related technical questions to Kyle James (kylej@bcdcog.com). Part 1 requests basic Applicant and project information, including a budget reviewed by a Professional Engineer. Part 1 applications are due on February 10, 2027 (4:00 PM), and BCDCOG reserves the right to ask clarifying questions of Applicants. Part 1 applications will be reviewed by BCDCOG, and qualifying Applicants will receive an invitation to complete Part 2. This invitation will include initial quantitative scores for Part 2 questions. For the Part 2 submittal, Applicants will have an opportunity to supplement the initial BCDCOG quantitative scoring with short narrative responses. Part 2 applications are due on March 31, 2027 (4:00 PM). Each qualified applicant will be required to provide a formal presentation about their project to the CHATS Transportation Enhancement Committee on April 15, 2027. ---------------------------------------------------------------- How to Attach Documents to this PDF Click on the red box in a given section of this PDF, navigate to and select the file that you would like to attach, and click “Upload”. The file then will be attached to the PDF. ---------------------------------------------------------------- * Applications that exceed the max award size are encouraged to apply in the event additional funding becomes available. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 2 of 20 Part 1 This section is reserved for BCDCOG staff. All screening criteria met: Yes No, missing: SC PART 1: PROJECT INFORMATION 1A: Applicant Information Project Name: Applicant Name: Applicant Street Address: City: Zip Code: Applicant Primary Contact First Name: Last Name: Title/Position: Phone Number: Email Address: No Yes, Agency Name: If yes, have you coordinated with the Implementing Agency? Does the Implementing Agency intend to apply to SCDOT to become an LPA for this project? No (the Applicant will request SCDOT to administer) Yes (the Implementing Agency has received approval from SCDOT to serve as an LPA on another project within the last 3 years and will apply to be an LPA for this proposed project) Eligible Applicants The following entities are eligible to apply for this grant opportunity: • City/town government • County government • Regional transportation authority • Transit agency • Other local/regional governmental entity with responsibility for or oversight of transportation or recreational trails (except for a Metropolitan Planning Organization) • Natural resource or public land agency • School district, local education agency, or school • Tribal government • Non-profit • State (at the request of another eligible entity) ------------------------------------------ Local Public Agency (LPA) SCDOT is the default project administrator. SCDOT can delegate the management of Federal-aid projects, such as the implementation of a TA Set- aside project, to eligible public entities. In order to be the Implementing Agency on a TA Set-aside project, an Applicant must apply to SCDOT to become a Local Public Agency (LPA) for the project after receiving an award. Fore more info, visit: scdot.org/business/ lpa.html No Yes Implementing Agency Is the Implementing Agency different than the Applicant? Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 3 of 20 Part 1 This section is reserved for BCDCOG staff. All screening criteria met: Yes No, missing: 1B: Project Type (check all that apply) Infrastructure Bikeway Non-infrastructure / Temporary Projects CHATS will prioritize applications for infrastructure projects, including infrastructure projects with a programming component. If funding remains after the award of infrastructure-focused projects and no other eligible infrastructure project can be funded with the remaining amount of FFY 26-27 funding, standalone non- infrastructure and temporary projects may be awarded. In addition, if an awarded project is terminated, funds may be made available for programming or municipal-wide plans. Programming (education, encouragement, enforcement, data collection, and data analysis programs) Municipal-wide Pedestrian, Bicycle, or Target Zero Plan Safe Routes to School (K-12) / Safe Routes to Transit Plan Temporary Pilot Project (must include pre- and post-installation analysis) Ineligible Activities Funding is not available for standalone design without a construction component; lighting; turnouts; overlooks/ viewing areas; historic preservation and rehabilitation of historic transportation facilities; vegetation management; management of outdoor advertising; archaeological activities; environmental mitigation; habitat restoration; mitigation of vehicle-wildlife collisions; and landscaping. Eligible Activities Funding is available for the planning, design, construction, and programming of publicly- accessible on- and off-street facilities within the CHATS boundaries dedicated to pedestrians, bicyclists, other non-motorized forms of transportation, and low-speed electric vehicles. For a map of the CHATS boundaries, please visit tinyurl.com/CHATSmap. Standalone non-infrastructure projects (programming, planning, and temporary pilot projects that do not have a long-term construction component) will only be considered for funding if no eligible infrastructure project can be funded with outstanding FFY 26-27 funds after initial award selection. feet Ex. On-street Bicycle Lanes, Protected Bicycle Lanes, etc. Pathway feet Ex. Shared-use Path, Sidepath, Over/Undercrossing, etc. Walkway feet Ex. Sidewalk, Dune Crossover, Boardwalk, etc. Trail feet Intersection Traffic Calming Ex. Road Diet, Pedestrian Refuge Island, Bulb-outs, etc. Wayfinding Other: Ex. Shared Micromobility Stations, Bicycle Signals, Demonstration Projects, Quick-Build Projects, etc. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 4 of 20 Part 1 This section is reserved for BCDCOG staff. All screening criteria met: Yes No, missing: 1C: Relevant Plans & Policies Is the proposed project in a local city- or town-wide pedestrian and bicycle plan that has been adopted within the last ten years? No Yes, attach: Is the proposed project recommended in BCDCOG’s Walk Bike BCD? No Yes Does the applicant or the local municipality in which the project is located have a locally-adopted Complete Streets policy? No Yes, attach: Does the applicant or the local municipality in which the project is located have an adopted Target Zero/Vision Zero policy? No Yes, attach: 1D: Project Location & Termini Attach Project Location Map: Screening Criteria Responses to screening questions 1C through 1H will be marked as complete or incomplete by CHATS. Responses will be reviewed for their accuracy, but no points will be assigned to this section for FFY 26-27. Relevant Plans & Policies Note: Future CHATS application cycles may require an applicant to be able to answer “Yes” to the first two screening questions about an adopted city- or town- wide pedestrian and bicycle plan and integration into BCDCOG’s Walk Bike BCD in order to be eligible to apply. ------------------------------------------ Project Location Briefly describe the proposed project’s specific begin and end extents. Ex. Maple Drive between First Street and Third Street in Summerville, SC. In addition, attach a map illustrating the project location and extents. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 5 of 20 Part 1 This section is reserved for BCDCOG staff. All screening criteria met: Yes No, missing: 1E: Existing Conditions Photos: ------------------------------------------------------------------------------------------ 1F: Future Conditions Supporting Documentation: Existing Conditions Briefly describe the current nearby land uses, pedestrian facilities, and bicycle facilities at the proposed project location. Ex. There is a total of 0.5 linear miles of existing sidewalk on both sides of Maple Drive along the project corridor, and there are no existing bikeways. The sidewalk connects to a 1.2-mile network of sidewalks; however, the existing sidewalks are in poor condition. There are no existing crosswalks along the project corridor. There are two elementary schools, one grocery store, and an employment center with 50 jobs along the project corridor. Optional: Attach photos of existing conditions to support your narrative. ------------------------------------------ Future Conditions Briefly describe the future land uses near the project if they differ from existing conditions. Also describe any nearby planned or fully funded transportation facilities at the proposed project location. Optional: Attach supporting documentation to help illustrate future conditions near the proposed project. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 6 of 20 Part 1 No, missing: This section is reserved for BCDCOG staff. All screening criteria met: Yes 1G: Proposed Project & Need For non-infrastructure projects, attach a Scope of Work: ------------------------------------------------------------------------------------------ 1H: Past Performance Does the Applicant have an ongoing TE/TAP/TA-funded project? No Yes, project name: Is the Applicant proposing a project that is a continuation or extension of a project that was previously allocated TE/TAP/TA funding? No Yes, project name: Has the Applicant terminated or canceled a TE/TAP/TA-funded project over the past nine Federal Fiscal Years (FFY17-FFY25)? No Yes, describe: Project Purpose Briefly describe the project, why it is needed, and how it will benefit local and regional residents, including any safety components. Applicants proposing a project that includes one of the non- infrastructure project types listed in Question 1B as either a standalone project or as part of an infrastructure project must attach a Scope of Work for the non-infrastructure component(s). BCDCOG staff will review if the Scope of Work is complete and thorough. Applicants are encouraged to share their draft Scope of Work with BCDCOG staff for feedback before the Part 1 deadline. ------------------------------------------ Past Performance In future application cycles, BCDCOG may require an Applicant be able to respond “No” to whether or not they have terminated or canceled a TA- funded project within the past five Federal Fiscal Years as a condition of Applicant eligibility. BCDCOG may also limit an Applicant to only one open TA- funded project at any given time. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 7 of 20 Part 1 This section is reserved for CHATS staff. All screening criteria met: Yes No, missing: Bonus points: 1I: Right-of-Way Impacts (select closest match) Not applicable (standalone non-infrastructure project) Project is 100% within the public right of way and will not require an easement(s), encroachment permit(s), or other approval(s) from a utility provider (10 bonus points) Project is 100% within the public right of way but may require an easement(s), encroachment permit(s), or other approval(s) from a utility provider (5 bonus points) Project (all or partially) will likely require right-of-way acquisition, in fee ownership, permanent easements, or temporary construction easements from private owners or will require utility relocations from utility providers outside of the Applicant or Implementing Agency’s control Project (all or partially) will likely require right-of-way acquisition, easements, or approval involving a governmental body other than SCDOT 1J: Completed Project Phases Check box and type completion date (mm/dd/yyyy) for all that apply. Planning Preliminary Design Environmental Review/ Permitting Final Design Right-of-Way Acquisition Utility Relocation Added to the TIP/STIP Project Feasibility Responses to project feasibility Questions 1I and IJ will be marked as complete or incomplete by BCDCOG. Bonus points will be awarded to projects with fewer right-of- way acquisition hurdles or to projects with completed phases. Proposed projects that require right-of-way acquisition or that have not completed any project phase will not be negatively impacted in the overall project score during the FFY 26-27 application cycle. ------------------------------------------ Right-of-Way Impacts Projects that are entirely within the right of way of the Applicant or Implementing Agency will receive the following bonus points: • 10 pts - Permanent control • 5 pts - Temporary control ------------------------------------------ Completed Project Phases Projects that have already completed phases in a manner that meets federal regulations, as determined by BCDCOG, will receive the following bonus points: • +5 pts - Preliminary Design • +5 pts - Environmental Review • +10 pts - Final Design • +10 pts - TIP/STIP Attach documentation of completed project phases. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 8 of 20 Part 1 This section is reserved for BCDCOG staff. All screening criteria met: Yes No, missing: 1K: Remaining Project Schedule Using the drop-down menus in the table below, insert the estimated start date and completion date for each project phase. If a phase has already been completed (as indicated in Question 1J) or if a phase is not proposed as part of the Applicant’s project, leave the corresponding row blank. Phase Estimated Start Date (mm/yy) Estimated End Date (mm/yy) Planning Preliminary Design Environmental Review/Permitting Final Design Right-of-Way Acquisition Construction/Utility Relocation Programming 1L: Maintenance For proposed infrastructure projects, what agency will be responsible for maintaining the infrastructure over its expected useful life and what level of maintenance will this agency provide? Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 9 of 20 Part 1 No, missing: This section is reserved for BCDCOG staff All screening criteria met: Yes Phase Total Estimated Project Costs FFY27 FFY28 FFY29 FFY30 FFY31 Planning $ $ $ $ $ Preliminary Design $ $ $ $ $ Environmental Review/ Permitting $ $ $ $ $ Final Design $ $ $ $ $ Right-of-Way Acquisition $ $ $ $ $ Construction/ Utility Relocation $ $ $ $ $ Programming $ $ $ $ $ Subtotal $ $ $ $ $ Total $ An itemized project budget for infrastructure projects must be developed or reviewed by a Professional Engineer certified in the State of South Carolina. Budgets for non-infrastructure projects do not require review by a Professional Engineer, but must be broken down by task. 1M: Estimated Costs The TA Set-aside is a cost reimbursement program, not a grant. The Applicant must pay the project expenses and request reimbursement for eligible expenditures. Any cost incurred prior to written authorization is not eligible for reimbursement. TA Set-aside funds are available for obligation for a period of three years after the last day of the Federal Fiscal Year for which the funds were authorized. For example, FFY 26 CHATS TA Set-Aside awards funds must be obligated by September 30, 2029. If all funds are not obligated by this deadline, the funds may lapse and will no longer be available to the Implementing Agency. The Applicant will be liable to repay obligated funds if a project is terminated, and a history of termination or lapsing funds may impact the Applicant’s eligibility for future funds. For FFY 26-27, BCDCOG anticipates awarding up to $1.1 million in total funding. For infrastructure projects (including infrastructure projects with a non-infrastructure component), the minimum award size is $300,000, and the maximum award size is $550,000. For standalone non-infrastructure projects, the minimum award size is $25,000, and the maximum award size is $300,000. In the table below, insert the estimated cost for each project phase by Federal Fiscal Year (October 1st through September 30th). If actual implementation costs exceed an Applicant’s cost estimates, the Applicant will be responsible for these additional costs. Note: SCDOT may charge up to 30% of the total project cost if they are administering the project. This should be reflected in your project budget. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 10 of 20 Part 1 No, missing: This section is reserved for BCDCOG staff. All screening criteria met: Yes Bonus points: 1N: Matching Funds For most TA Set-aside projects, Applicants can request funding for up to 80% of the total cost of eligible activities, and the remaining 20% must be provided through non-federal funds. Non-federal funds may be provided by a non-federal government agency, non-profit, or private entity. These funds should be available at the time of award. Requested TA Set-aside funding: No. Matching Funds Funding Source #1 #2 #3 #4 #5 Total $ % Match BCDCOG will review responses to Question 1N for completeness and to confirm that the Applicant can provide the required 20% minimum non-federal match. Bonus points will be awarded to projects that exceed the required minimum match. For each 1 percentage point of the total cost of eligible activities that an Applicant provides in non-federal matching funds, 0.2 bonus points will be added to the Applicant’s overall project score. See the table below for examples. Percent Non-Federal Bonus Points Percent Non-Federal Bonus Points 20% 0.0 30% 2.0 21% 0.2 40% 4.0 22% 0.4 50% 6.0 23% 0.6 60% 8.0 24% 0.8 70% 10.0 25% 1.0 80% 12.0 End of Part 1 Email completed PDF to kylej@bcdcog.com by 09/25/2026 at 4:00 PM EST $ $ $ $ $ $ Please indicate the source(s) of non-federal matching funds in the table below. Stop Here for Part 1 Part 1 applications will be assessed by BCDCOG and SCDOT staff for completeness and feasibility. Qualified Applicants with qualified projects will be encouraged to submit a Part 2 application and to present to the CHATS TE Committee on 12/09/26. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 11 of 20 Part 2 PART 2: EVALUATION CRITERIA Instructions for Part 2 differs based on if the Applicant is requesting funding for an infrastructure project or a non- infrastructure project. Infrastructure Project Instructions Based on the information submitted in Part 1 about the proposed infrastructure project (including infrastructure projects with non- infrastructure components), the quantitative components of Part 2 will be initially scored by BCDCOG staff. The results of this initial scoring will be shared with the Applicant. To complete the application for infrastructure projects, the Applicant then: • Can choose to supplement the quantitative analysis completed by BCDCOG staff for Questions 2A - 2D with additional information to potentially improve their final score for each evaluation criterion. • Must share completed and anticipated public engagement activities in Question 2E. • Must certify the application in Question 2F to verify the accuracy of the information provided in Part 1 and Part 2. The TE Committee reviewers will review supplemental information provided by the Applicant, as well as the Applicant's response to the public engagement question. Incomplete applications will not be reviewed by BCDCOG. Non-Infrastructure Project Instructions For standalone non-infrastructure projects, the Applicant must only complete Questions 2E and 2F. No quantitative analysis will be provided by BCDCOG staff for Questions 2A - 2D, and the Applicant will not need to provide supplementary information for these sections. Standalone non-infrastructure projects will be evaluated by the CHATS TE Committee reviewers based on the Applicant’s response to Question 2E and supplemented by the Scope of Work attached to Question 1G. Incomplete applications will not be reviewed by BCDCOG. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 12 of 20 Part 2 This section is reserved for CHATS Transportation Enhancement Committee reviewers. Reviewer Score: Reviewer Initial: /20 2A: Accessibility (20 available points) How well will the proposed infrastructure project be able to improve access to facilities that help meet residents’ basic daily needs? CHATS Accessibility Criteria Radius (mi) No. Total existing public transit stops and lots, plus planned Lowcountry Rapid Transit stations 0.25 Total healthcare and social service facilities, grocery stores, and community centers 0.25 Total acres of park space (10 acres = 1 facility) 0.25 Total K-12 and college school enrollment (500 students = 1 facility) 0.25 Total part- and full-time jobs (1,000 jobs = 1 facility) 0.25 Initial Accessibility Score After the submission of Part 1 of the application and receiving the initial score in the table above from BCDCOG staff, an Applicant can provide supplementary information about how their proposed project will improve access to facilities that help meet residents’ basic daily needs in the box below. Initial Accessibility Score Based on the project information provided in Part 1, BCDCOG staff will provide an initial accessibility score for each proposed infrastructure project. Park space, school enrollment, and jobs will be weighted so that they can be compared to transit and major facilities. BCDCOG will tally the total number of facilities listed in the table to the left. • 0 points – 0 facilities • 7.5 points - 1-5 facilities • 15 points - 6-10 facilities • 20 points - 11+ facilities ------------------------------------------ Final Accessibility Score Applicants can choose to add additional information about how their proposed project will improve accessibility. Based on the narrative, CHATS reviewers will decide if the final accessibility score should be higher than the initial score. This additional information is optional, and the Applicant’s final score will not be lowered from the initial score. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 13 of 20 Part 2 This section is reserved for CHATS Transportation Enhancement Committee reviewers. Reviewer Score: Reviewer Initial: /20 2B: Economic (20 available points) What percentage of the project in the surrounding Census Tract(s) is located in an Area of Persistent Poverty? CHATS Economic Criteria Count Percent Total Population 100% Area of Persistent Poverty Initial Economic Score After the submission of Part 1 of the application and receiving the initial score in the table above from BCDCOG staff, an Applicant can provide supplementary information about how their proposed project will benefit a high-need community in the box below. Other criteria that an Applicant may consider citing are low-income or transit-dependent populations that would directly benefit from the proposed project. Initial Economic Score Based on the project information provided in Part 1, BCDCOG staff will provide an initial economic score for each proposed infrastructure project. BCDCOG will identify the Census Tracts in which the proposed project is located, and then will calculate the percent of the population that is considered an Area of Persistent Poverty by USDOT. For each whole 1% of the population that meets USDOT’s definition, 0.2 points will be awarded. Therefore, if 50% of the population near the proposed project is considered historically disadvantaged, the project will receive 10 points. ------------------------------------------ Final Economic Score Applicants can choose to add additional information about how their proposed project will benefit high-need communities. Based on the narrative, CHATS reviewers will decide if the final economic score should be higher than the initial score. This additional information is optional and the Applicant’s final score will not be lowered from the initial score. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 14 of 20 Part 2 This section is reserved for CHATS Transportation Enhancement Committee reviewers. Reviewer Score: Reviewer Initial: /20 2C: Connectivity (20 available points) How well will the proposed infrastructure project be able to increase connections to walkways, bikeways, or pathways by either closing gaps in the existing network or extending the network? CHATS Connectivity Criteria Lane Miles Total distance of connected walkways after project completion Total distance of connected bikeways after project completion (including bicycle boulevards but excluding paved shoulders and shared lanes) Total distance of connected pathways after project completion* Initial Connectivity Score * Because 12-foot or wider pathways allow for travel in both directions, each mile of pathway will count as 2 lane miles. After the submission of Part 1 of the application and receiving the initial score in the table above from BCDCOG staff, an Applicant can provide supplementary information about how their proposed project will increase connectivity for pedestrians, bicyclists, other non-motorized travelers, and low-speed electric vehicle users in the box below. Initial Connectivity Score Based on the project information provided in Part 1, BCDCOG staff will provide an initial connectivity score for each proposed infrastructure project. CHATS will sum the number of lane miles (miles of facility in a given direction of travel) of walkways, bikeways, and pathways. • 0 points - 0 lane miles • 7.5 points - 0.1-0.5 lane miles • 15 points - 0.6-1.0 lane miles • 20 points - 1.1+ lane miles ------------------------------------------ Final Connectivity Score Applicants can choose to add additional information about how their proposed project will increase connectivity. Based on the narrative, CHATS reviewers will decide if the final connectivity score should be higher than the initial score. This additional information is optional and the Applicant’s final score will not be lowered from the initial score. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 15 of 20 Part 2 This section is reserved for CHATS Transportation Enhancement Committee reviewers. Reviewer Score: Reviewer Initial: /20 2D: Safety (20 available points) How well will the proposed infrastructure project be able to reduce the probability of crashes leading to pedestrian or bicyclist injuries? Safety Countermeasure Monetized Crash Value* Crash Reduction Factor Estimated Monetary Benefit No. Name #1 $ $ #2 $ $ #3 $ $ #4 $ $ #5 $ $ Initial Safety Score *Monetized crash value based on USDOT guidance ($13,200,000 for fatalities, $1,254,700 for serious injuries, and $246,900 for minor injuries) for crashes between 1/1/2020 and 12/31/2024 After the submission of Part 1 of the application and receiving the initial score in the table above from BCDCOG staff, an Applicant can provide supplementary information about how their proposed project will address pedestrian and bicyclist safety issues in the box below. Initial Safety Score Based on the project information provided in Part 1, BCDCOG staff will provide an initial safety score for each proposed project. BCDCOG will identify the safety countermeasures proposed by the Applicant and the corresponding crash reduction factor (CRF) from FHWA’s Clearinghouse. The CRF will be applied to monetized injury values based on severity for each reported crash along the corridor: • 0 points - $0 • 5 points - $1-$1m • 10 points - $1.1m-$5m • 15 points - $5.1m-$15m • 20 points - $15.1m+ ------------------------------------------ Final Safety Score Applicants can choose to add additional information about how their proposed project will address safety needs. Based on the narrative, CHATS reviewers will decide if the final safety score should be higher than the initial score. This additional information is optional and the Applicant’s final score will not be lowered from the initial score. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 16 of 20 Part 2 This section is reserved for CHATS Transportation Enhancement Committee reviewers. Reviewer Score: Reviewer Initial: /20 2E: Engagement (20 available points) Describe how the need for the proposed infrastructure project was identified through a community-based public engagement process that culminated in the project proposal, including noticed public meetings, surveying, consultation with stakeholders, and targeted input from disadvantaged communities? If engagement is planned but has not been completed, describe planned engagement activities. If there is opposition to the project, the Applicant should summarize major concerns raised and provide a response. Attach and cross-reference any letters of support within the narrative: Final Engagement Score BCDCOG staff will not provide an initial engagement score, and the final engagement score will be determined by CHATS reviewers using the rubric below: • 0 points - No completed public engagement to-date, and planned engagement activities are not thoroughly described or not appropriate for the context of the project. • 7.5 points - No completed public engagement to-date, but planned engagement activities are thoroughly described and appropriate. • 15 points - Have thoroughly described completed engagement activities and documented how the feedback received supports the need for the project. • 20 points - Have thoroughly described completed engagement activities, including targeted engagement of disadvantaged communities, and documented how the feedback received supports the need for the project. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 17 of 20 Part 2 This section is reserved for CHATS Transportation Enhancement Committee reviewers. Reviewer Score: Reviewer Initial: /20 Rationale: 2F: Certification To complete this application, authorized personnel at the Applicant’s agency must provide their name below to certify the accuracy of the technical information provided in their application. __________________________________________________________________________________ This section is reserved for BCDCOG staff. All screening criteria met: Yes No, missing: End of Part 2 Email completed PDF to kylej@bcdcog.com by 12/01/2026 at 4:00 PM EST Stop Here for Part 2 Part 2 applications will be assessed by the CHATS TE Committee reviewers during the Applicant presentations on 12/09/26. Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 18 of 20 Part 2 Project Scoring & Selection Screening Criteria Feedback After submission of Part 1 by an Applicant, BCDCOG and SCDOT staff will evaluate if the proposed infrastructure or non-infrastructure project meets all screening criteria. If the project does not meet all screening criteria, BCDCOG and SCDOT staff will provide feedback to the Applicant on how to improve an application for submittal during a future funding cycle. Project meets screening criteria: Yes No , and staff feedback: Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 19 of 20 Part 2 Selection Process: Reviewers from the CHATS Transportation Enhancement Committee will use an Applicant’s responses to Part 2 and their presentation to provide a final score of the Part 2 evaluation criteria for infrastructure and non-infrastructure projects. There will be at least three reviewers per application, and the total number of reviewers will be based on the total number of applications received. Reviewers will not be able to review a project in which their agency is the Applicant, in which the project is within their jurisdiction, or in which they are providing matching funds. BCDCOG staff will collate the bonus points and final scores into one of the corresponding infrastructure or non-infrastructure scoring tables on page 20. BCDCOG staff will calculate the average score for each proposed project. There is no minimum score needed to qualify for project funding. BCDCOG staff will present the project rankings to the CHATS Transportation Enhancement Committee. Tied project rankings will be broken by BCDCOG staff based on project feasibility. The highest-ranking infrastructure project will be recommended for award funding to the CHATS Policy Committee. If the second highest-ranking infrastructure project can be accommodated with the remaining FFY 26-27 TA Set-aside funding, it will also be recommended to the CHATS Policy Committee. If the requested funding amount for the second highest-ranking project exceeds remaining funding, BCDCOG staff will either request that the Applicant amend the project scope and budget to align with the available remaining funding or will move onto the next highest-ranking infrastructure project. This process will continue until no available funding or proposed infrastructure projects are left. If no proposed infrastructure project can be completed with the remaining FFY 26-27 TA Set-aside funding, proposed non-infrastructure projects will be considered using the same approach as described for the infrastructure projects. BCDCOG reserves the right to work with an Applicant on modifying their Scope of Work for a standalone non-infrastructure project before recommending it to the CHATS Policy Committee. The award recommendations will be submitted to the CHATS Policy Committee for approval. If approved by the CHATS Policy Committee, the projects will be forwarded to SCDOT, and the Applicants will work with SCDOT to complete all preliminary steps needed to execute a financial participation agreement. For more information on SCDOT's process, please visit: https://www.scdot.org/business/lpa.html Charleston Area Transportation Study (CHATS) Transportation Alternatives (TA) Set-aside FFY 26-27 Application Form v8.4 (10/16/2026) Page 20 of 20 Part 2 Infrastructure Scores Reviewer Part 1 Bonus Points Part 2 Evaluation Criteria Sub- total 1I 1J 1N 2A 2B 2C 2D 2E Points +0-10 +0-25 +0-12 0-20 0-20 0-20 0-20 0-20 0-100 BCDCOG Staff - Reviewer #1 - - - Reviewer #2 - - - Reviewer #3 - - - Reviewer #4 - - - Reviewer #5 - - - Reviewer #6 - - - Reviewer #7 - - - Reviewer #8 - - - Reviewer #9 - - - Reviewer #10 - - - Subtotal - - - Non-Infrastructure Scores Reviewer Part 1 Bonus Points Part 2 Sub- total 1I 1J 1N 2E Points +0-10 +0-25 +0-12 0-20 0-20 BCDCOG Staff - Reviewer #1 - - - Reviewer #2 - - - Reviewer #3 - - - Reviewer #4 - - - Reviewer #5 - - - Reviewer #6 - - - Reviewer #7 - - - Reviewer #8 - - - Reviewer #9 - - - Reviewer #10 - - - Subtotal - - - Total Average - - - Total Average - - - - - - - - - - - - - - - - - - - - - -- - - - - -- - - - - - - MOBILITY STUDY 2026 IOP 2026 Mobility Study was developed by the Berkeley-Charleston-Dorchester Council of Governments (BCDCOG) 2026 MOBILITY STUDY 2 CITY OF ISLE OF PALMS 08/17/26 INTRODUCTION The City of Isle of Palms (IOP) is a barrier island community located less than ten miles from Charleston Harbor along South Carolina’s coast. The City’s nearly five miles of public beachfront is among its most valuable assets, attracting thousands of visitors each year and serving as the cornerstone to the local economy, residents’ quality of life, and the community’s coastal identity. BACKGROUND Mobility – the ability of people to move throughout and access different parts of a community – is essential for coastal communities, like IOP, that experience a significant influx of daily visitors. As tourism and the subsequent traffic volume continue to grow each year, the demand for additional, safer alternative connections across the island also increases. The City recognizes that improving and expanding its current infrastructure to meet the rising demand is key for enhancing mobility and maintaining a network accessible to both residents and visitors of all ages and abilities. PURPOSE The purpose of this Mobility Study is to provide the city with the guidance and resources needed to inform them on future decision making related to improving safety, accessibility, and connectivity around the island. A safe, well-connected network of streets, sidewalks, bike facilities, and off-road paths can provide greater mobility for people to access jobs, schools, shops, dining, parks, beaches, community centers, and other public spaces. These connections are vital for the ongoing social, economic, and physical health and success of the community. The main components of this study will be to: 1. Assess the existing conditions of IOP’s current infrastructure 2. Identify any gaps in the network to/from popular destinations 3. Gather public input needs 4. Identify projects based on a needs assessment 5. Provide the City with a set of prioritized projects and recommendations to be implemented in the future as funding becomes available 3 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 DEVELOPING THE STUDY The Mobility Study was developed between Spring 2025 and Summer 2026 with close coordination between IOP residents, community organizations and committees, Planning Commission, City Staff, and the BCDCOG. It incorporates priorities, goals, themes, and ideas from other City plans, including its Comprehensive Plan, Strategic Plan, and Community Enrichment Plan. The planning process consisted of three main steps: Data Collection & Analysis, Needs Assessment, and Project Recommendations. The two primary data collection methods used were: a field survey to document existing conditions and public engagement to better understand community priorities and needs. The results of both the field survey and public engagement were used as the foundation for the Needs Assessment. This resulted in a list of identified projects which were then scored and prioritized based on their anticipated impact, feasibility, and alignment with community needs. Other information, such as demographics, public health statistics, crash history, and walk and bike counts were also gathered from various sources as part of the existing condition analysis and used to inform the Needs Assessment. PROJECT TIMELINE Ñ APRIL 2025 i Project Kick Off Ñ JUNE-JULY 2025 i Field Survey Ñ SEPTEMBER-OCTOBER 2025 i Online Public Survey i In-Person Public Open House Ñ NOVEMBER 2025-FEBRUARY 2026 i Existing Condition Analysis Ñ MARCH-MAY 2026 i Needs Assessment i Project Identification Ñ JUNE-JULY 2026 i Project Scoring i Selection of Recommended Projects i Cost Estimates of Recommended Projects Ñ AUGUST 2026 i Final Adoption The IOP 20026 Mobility Study was commissioned by the City of Isle of Palms using funding from Explore Charleston and the Accommodations Tax (A-Tax). 2026 MOBILITY STUDY 4 CITY OF ISLE OF PALMS 08/17/26 SIDEWALK FIELD SURVEY A field survey was conducted during Summer 2025 and was essential to accurately evaluate and catalog the existing conditions of IOP’s current sidewalk network. This involved several in-person site visits and walkthroughs, providing firsthand observations of sidewalk conditions throughout the city. The field survey focused on the city’s publicly accessible sidewalk infrastructure. Facilities within the gates of the Wild Dunes resort area were not considered within this study. A summary table of the sidewalk inventory is included as Appendix A. AT-GRADE SIDEWALK WITH TRUNCATED DOMES DELINEATED CROSSWALK WITH PEDESTRIAN CROSSING SIGN MOBILE FIELD SURVEY APP For the site visits, an online mobile field survey application was developed to evaluate and catalog sidewalk conditions in real time using a smartphone or tablet. Each sidewalk segment was mapped as an individual GIS feature with a customized attribute form to record key sidewalk characteristics, including surface type and condition, pavement width, pavement elevation, safety and ADA infrastructure, and the presence of impediments or obstructions to walkability. Photo attachments created a visual record of issues, including sand, sediments, and debris covering the pavement, overgrown vegetation, pavement damage, standing water, and other safety concerns. A complete assessment of the city’s sidewalk inventory from the mobile GIS app and be viewed using the QR Code or by going to: https://arcg.is/TCe5b1 Once in the app, select any sidewalk segment and click the table icon to view all of the collected data, including the photographs. 5 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 PUBLIC ENGAGEMENT Public engagement was a key step in identifying the needs and priorities of the community. There were two public engagement opportunities offered throughout the planning process - an online survey and an open house event. Results from both methods of public engagement provide an assessment of the city’s network based more on firsthand knowledge and personal experiences compared to the more analytical assessment from the field survey. 0 10 20 30 40 50 60 9/16 9/19 9/22 9/25 9/28 10/1 10/4 10/7 10/10 10/13 10/16 10/19 10/22 10/25 10/28 10/31 # of Daily Responses Peak Participant Volume with 56 Responses on Oct. 14th In-person Open House was held on Oct. 20th PUBLIC SURVEY RESPONSE VOLUME PUBLIC SURVEY The online public survey was live from September 16th to October 31st, a total of 45 days. During that period, there were about 13,700 total responses and nearly 500 comments collected from the 463 total participants. The survey was organized into six topics - Residency, Transportation Modes, Destinations, Safety, Projects, and Support Level - guiding participants through a logical flow and strategic thought process to encourage more focused and reflective responses. Paper copies of the survey were available at City Hall upon request. 463 TOTAL ONLINE SURVEY PARTICIPANTS 13,724 TOTAL RESPONSES & 477 COMMENTS WHO PARTICIPATED 2026 MOBILITY STUDY 6 CITY OF ISLE OF PALMS 08/17/26 0 30 60 90 120 Under 2 2 to 5 6 to 10 11 to 20 Over 20 Never Rarely Occasionally Often Always TRANSPORTATION MODES : Q How often do you take short trips on the island using the following modes of transportation? As expected, most participants prefer to drive when taking short trips around the island, with nearly three- quarters responding “Often” or “Always.” Despite the limited inventory of sidewalk and bike infrastructure, 60% of participants reported frequently walking, and 37% reported frequently biking. Although not every household has access to a golf cart or LSV, those that do likely use them just as frequently as cars for those short trips on the island. RESIDENCY : Q What is your relationship with the City of Isle of Palms? : Q Are you a full-time or part-time resident? : Q How long have you lived on Isle of Palms? Of the 463 participants, a vast majority had a direct relationship with IOP - being either an IOP resident, business owner, and/or property owner. Nearly all residents who participated in the survey lived on the island full-time (98%), with just over half reporting that they had been a resident for over ten years. IOP Resident Not Resident but Interested Business Owner Property Owner (Not Primary Residence) Frequent IOP Visitor were IOP Residents 63% REASONS FOR WALKING OR BIKING : Q Please select your most common reasons for walking or biking. Identifying common reason(s) for walking or biking around the island revealed potential behavioral patterns of residents. Roughly 9 out of 10 participants chose “Leisure/ Health/Exercise” as one of their most common reasons for walking or biking while three-fourths chose “Going to the Beach.” “Walking Pets” was a common write in answer. Most reasons for walking or biking are associated with a specified destination, such as going to the beach, shopping/dining, and commuting to work, while some, like for leisure, health, or exercise and walking pets are not necessarily. 0 80 160 240 320 Other Accessing Beach Reach Bus Stop Commuting to Work Going to Religious Services Accessing Public Services Visiting Friends/Family Shopping/Dining Going to Beach Health/Leisure/Exercise Note: Data for Scooters and E-Bikes is not shown but can be found in Appendix A. YEARS OF RESIDENCY 7 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 DESTINATIONS : Q How often do you walk and/or bike to these points of interest on IOP? : Q Please select the IOP points of interest that should be prioritized for future connectivity improvements. Walking and/or biking is by far the most common way that participants travel to the beach on IOP. With the numerous beach access points across the island, accessibility to the beach is greater than most other popular destinations on the island which are usually limited to a specific area. In addition, participants were asked to select the points of interest that should be prioritized for future connectivity improvements. The Beach Access Points and IOP Connector Intersection and Shopping Centers were both selected by nearly two-thirds of participants. With about 40% of participants indicating that they either never or rarely walk and/or bike to the IOP Connector, expanded infrastructure in that area would greatly improve the mobility and connectivity of that important destination and help address the needs expressed by residents. 0% 20% 40% 60% 80% 100% Beach Access Front Beach Rec Center Church Services Connector Inlet Marina Never Rarely Occasionally Often Always 0 40 80 120 160 200 240 280 Places of Worship Other Public Services Breach Inlet Rec Center & Park Marina Front Beach IOP Connector Beach Access PROJECTS : Q Please select which of the following improvements would most likely influence your decision to walk and/or bike around the island. When asked which of the following improvements would most likely influence a respondent’s decision to walk and/or bike around the island, the top responses were focused primarily on physical aspects of IOP’s network – improving and expanding infrastructure – rather than enhancing the quality and experience. 0 50 100 150 200 250 Improved Wayfinding & Signage Other More Shade from Trees & Protection from Weather Improved Lighting & Security Bike Parking/Bike Facilities Traffic Calming Additional Pedestrian Amenities Improved Crosswalks/Intersections Protected Bike Lanes New, Extended and/or Widened Sidewalks 2026 MOBILITY STUDY 8 CITY OF ISLE OF PALMS 08/17/26 SURVEY MAP Q2: UNSAFE INTERSECTIONS In addition to identifying unsafe streets, participants were also asked to identify any intersections - including crosswalks - that they felt unsafe at when walking and/ or biking. Points were again concentrated along Palm Boulevard. Point Placed (62 Total) Nearly 1 in 5 participants reported feeling unsafe at the IOP Connector-Palm Boulevard intersection. SURVEY MAP Q1: UNSAFE STREETS Participants were asked to identify any specific walking and/or biking routes/streets that they felt unsafe on. Palm and Waterway Boulevards received the majority of comments. Point Placed (58 Total) Line Drawn SURVEY MAP Q3: NEEDED INFRASTRUCTURE Bike Lane (51 Total) New Sidewalk (43 Total) Crosswalk (29 Total) Sidewalk Widening (15 Total) Benches, Bike Rack, Shade Trees (10 Total) Lighting (7 Total) When asked where respondents think improvements are needed, most of the points identified were concentrated along streets with existing sidewalk and/or bike infrastructure. 9 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 MOBILITY GOALS : Q Please indicate your level of agreement with each of the following connectivity goals for the City of Isle of Palms: The following goals have been identified throughout the years and across several plans. An overwhelming majority of survey participants “Agreed” with each of the statements. EXPAND SAFE PEDESTRIAN & BICYCLE ACCESS ISLAND-WIDE 77% Agreed 18% were Unsure 5% Disagreed IMPROVE TRAFFIC FLOW, ESPECIALLY DURING HIGH-TRAFFIC DAYS 78% Agreed 18% were Unsure 4% Disagreed REDUCE VEHICLE & PEDESTRIAN CRASHES & INJURIES 77% Agreed 22% were Unsure 1% Disagreed ENCOURAGE ALTERNATIVES TO PRIVATE CAR USE 71% Agreed 19% were Unsure 9% Disagreed EXPAND INCLUSIVE INFRASTRUCTURE DESIGNS FOR ALL AGES, HOUSEHOLDS, & ABILITIES 64% Agreed 29% were Unsure 7% Disagreed PLAN FOR FUTURE GROWTH, CLIMATE RISKS, & INFRASTRUCTURE OWNERSHIP 78% Agreed 14% were Unsure 8% Disagreed FALL OPEN HOUSE The Fall open house was held on October 20th from 5:30pm to 7:30pm at the IOP Rec Center. Approximately 20 people attended the event. There were several interactive stations including one that asked attendees to map the routes that they take to the beach, for their daily walk or run, to walk their pet, etc, and another that asked about the needed micromobility improvements throughout the island. 2026 MOBILITY STUDY 10 CITY OF ISLE OF PALMS 08/17/26 COMMUNITY PROFILE For decades, IOP has slowly been transitioning from being a primarily residential, commuter community to a popular vacation and retirement destination. As a result, the demographic composition of the city has also changed over time - consisting of more retirees and empty nesters as opposed to working adults and young families. This shift requires the city to not only adapt to the changing needs of its residents but also to its changing role in the region. With the island approaching build out, IOP’s population has remained relatively steady since 2000, fluctuating between 4,000 and 4,800 residents. In 2023, IOP’s resident population was estimated at 4,350 people. However, during the peak summer months, the island witnesses as high as 25,000 additional daily trips from visitors and vacationers, essentially quadrupling the number of people on the island. This was a key factor in the city’s recent IOP Thrives! Community Enrichment Plan and will be taken into consideration during the Needs Assessment of this study. 698 998 1378 696 871 686 1592 979 1167 720 751 418 877 603 701 45.1 51.5 54.2 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 2000 2010 2023 Total Population Chart Title +97% increase in Older Adults (65+) since 2000, despite the total population decreasing by about 5% Under 18 18 to 34 35 to 54 55 to 64 65 & Over AGE Age shapes how communities move - influencing social connections, daily routines, mobility choices, and safety needs. People of different ages often rely on different mobility infrastructure to meet their needs. IOP’s increasing median age is likely due to the city’s ongoing popularity as a retirement destination as well as current residents aging-in-place. 54 YEARS IOP 2023 MEDIAN AGE Compared to... 39 years in Charleston County, 38 years in the BCD Region, and 40 years in South Carolina. Data Source: US Decennial Census and American Community Survey (ACS) 5-Year Estimates 11 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 29% 40% 43% 67% 100% 40% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% STRL No STRL HOUSING & SHORT TERM RENTALS A 2023 analysis of dwelling units and short term rental licenses (STRL) revealed that of the 4,610 total dwelling units in IOP, an estimated 40% had a STRL. These units are major contributors to the islands growing seasonal visitation numbers and the increased demand for additional safer and more accessible connections islandwide. Single Family Townhouse Duplex/ Triplex Condo Commercial Condo Total Dwelling Units Data Source: Analysis of Short-Term Rentals per Type of Dwelling https://www.iop.net/sites/default/files/ uploads/STRs/str_analysis_10.31.2023.pdf CENSUS TRACT 49.01 CENSUS TRACT 49.02 • 10.2% had a mobility disability • 14.7% were physically inactive • 10.7% experienced frequent mental distress • 3.2% lacked reliable transportation of the past 12 months • 10.3% had a mobility disability • 13.9% were physically inactive • 9.6% experienced frequent mental distress • 2.7% lacked reliable transportation of the past 12 months HEALTH CONDITIONS & DISABILITIES The health conditions and disability status of residents can influence the transportation and infrastructure needs of a community. In 2023, an estimated 11% of IOP residents reported having a disability. Data Source: CDC PLACES Note: Percentages are of Adults aged 18 years and older BUSINESSES & EMPLOYEES In 2026, there were an estimated 195 businesses located in IOP that employed 2,165 people. Retail Trade, Real Estate, Rental, & Leasing, and Accommodations & Food Services industries account for a significant portion of businesses and employees. TOP INDUSTRIES BUSINESSES EMPLOYEES NUMBER PERCENT NUMBER PERCENT Retail Trade 27 13.8% 253 11.7% Real Estate, Rental, & Leasing 34 17.4% 363 16.8% Accommodations 11 5.6% 685 31.6% Food Services 24 12.3% 272 12.6% All Other Industries 99 50.8% 592 27.3% Data Source: Esri’s Business Analyst, Business Summary Report 2026 MOBILITY STUDY 12 CITY OF ISLE OF PALMS 08/17/26 Outflow Commuters Inflow Commuters 180 Internal Commuters 1,499 1,288 Data Source: US Census OntheMap Tool 2022 COMMUTING TRENDS Multi-vehicle households continue to be the norm in IOP. High levels of household vehicle availability are closely tied to taking private vehicles to work, reflecting residents’ continued preference for driving alone as their primary travel mode. Encouraging residents to use alternative modes of transportation, such as walking, biking, golf carts/LSVs, etc. for short trips on the island will help reduce the demand for on- and off-street parking. This can have major impacts on traffic patterns and needs islandwide - particularly during the summer months, in the Front Beach area, and at the beach accesses. D r ive Alone 62.5% 26.5% 0.6% 0.5% 7.6% 1.4% Carpool Walk Bike Work from Home Public Transit +15 Points in commuters Working from Home since 2019, a common trend since the COVID-19 pandemic which prompted a nationwide shift towards remote working HOUSEHOLD VEHICLE AVAILABILITY 65% of households had access to at least 2 vehicles Only about 2% of households had no access to a vehicle in 2023, most of which were within the gates of Wild Dunes development. IN 2010, 13% of commuters either walked, biked, or rode public transit to work that percentage has decreased to <3% IN 2023 COMMUTER MODES OF TRANSPORTATION No Vehicle 1 Vehicle 2 Vehicles 3+ Vehicles COMMUTER FLOW IOP’s retail, restaurant and hospitality industries draw daily commuters from across the region for work. In 2022, IOP had more inflow commuters than outflow commuters which reflects the city’s ongoing transformation from a bedroom community to a regional tourism and hospitality destination. The high percentage of residents that work from home affects the number of outflow commuters as they don’t commute into work. 13 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 ACTIVITY GENERATORS & HUBS Activity generators are places that consistently attract people for a specific reason or purpose, such as to work, shop, dine, learn, exercise, worship, or gather. IOP features numerous activity generators - including beach access points, restaurants, shops, lodging, entertainment venues, recreation facilities, and community services - that collectively establish the city as a destination in and of itself. While many of these places serve both residents and visitors, some primarily cater to one group over the other. For example, city services, places of worship, and recreation facilities are generally resident-oriented, while lodging and entertainment venues primarily serve visitors. The location, type, and concentration of activity generators influence how people a the transportation network, where they travel, how often they travel, and whether they choose to walk, bike, drive, or use other modes of transportation. Identifying these places provides valuable insight into existing and future travel demand, as well as the infrastructure needed to safely and efficiently connect people to the places they want to go. Five areas across the island were identified as having high concentrations of activity generators: • Front Beach commercial area • Island “Entrance” shopping centers • IOP Recreation Center & Park • “Palm Boulevard beach access” area • IOP Marina These activity “hubs” generate a significant share of trips throughout the island, making safe and accessible multi-modal connections to and between them essential. Evaluating how well the transportation system - particularly the city’s micromobility infrastructure - serves these places helps identify opportunities to improve safety, accessibility, connectivity, and overall mobility. 2026 MOBILITY STUDY 14 CITY OF ISLE OF PALMS 08/17/26 Isle of Palms County Park IOP Public Safety Building Pavilions Shoppes at Front BeachWindjammer Bar & Event Venue Front Beach includes a wide range of land uses that cater primarily to visitors, tourists, and vacationers, but are utilized by residents as well. Most of the island’s higher intensity development, including restaurants, hotels, and retail shops are located within this area and routinely generate high volumes of foot traffic during peak seasons. Ocean Boulevard is a prime example of what successful Complete Street policies could look like. This corridor was designed to encourage walkability by having wide and accessible sidewalks, frequent and safe pedestrian crossings, limited storefront parking, and different pedestrian and cyclist amenities including beaches, shade trees, murals/public art, bike racks, and planters. FRONT BEACH 97 ACTIVITY GENERATORS WERE IDENTIFIED ACROSS THE ISLAND, INCLUDING: • Dozens of Businesses • 40+ Beach Access Points • Places of Worship • Beach Reach Shuttle Stop • Dewees Island Ferry Terminal • Recreation Center & Park • Isle of Palms County Park • IOP Marina • City Hall • Public Safety Building 15 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 Ocean Park Plaza Shopping CenterIsland Center Shopping Center Characterized by its vehicle- oriented development, the IOP Island Entrance is mostly comprised of shopping centers that feature different businesses that provide essential daily services for IOP residents and visitors, like restaurants, banks, salons, offices, and stores. These destinations are primarily supported by the vehicular through traffic along the IOP Connector and Palm Boulevard. ISLAND ENTRANCE Beach Access Points Commercial Government Lodging Medical Parking/Transportation Public Services Recreation Religious 2026 MOBILITY STUDY 16 CITY OF ISLE OF PALMS 08/17/26 EXISTING CONDITIONS IOP’s transportation system is comprised of a multi-modal network of streets, sidewalks, bike facilities, multi-use paths, and off-road paths. The interconnectedness of the infrastructure is crucial for the city as residents and visitors rely on these connections for their daily needs, to travel between destinations, and to access employment, education, and other essential services. Assessing the existing conditions of the transportation infrastructure is a key element of this study which formed the foundation for the strategies and recommendations outlined later in the Implementation section. ROADWAY NETWORK IOP’s roadway network shapes the city’s transportation system, enabling both IOP residents and visitors to move throughout and access different parts of the community. With driving being the primary mode of travel for most people, it has become a critical component in the city’s overall mobility and accessibility. The existing network supports the year-round traffic demand generated mostly by residents with the seasonal traffic brought on by visitors. The island is connected to the mainland and Town of Mount Pleasant via SC 517 - more commonly known as the IOP Connector - and to the neighboring Town of Sullivan’s Island via SC 703 (Palm Boulevard). Palm Boulevard is the main roadway that connects different parts of the community, including Breach Inlet, Front Beach, and the Wild Dunes resort area. OWNERSHIP & MAINTENANCE Street and right-of-way ownership and maintenance is a common challenge for municipalities as oftentimes the ownership influences the ability to improve infrastructure in a timely manner. Different government agencies typically have different funding sources, schedules, and priorities which can impact the consistency of improvements and maintenance. TRANSIT ROUTES The Beach Reach Shuttle is a seasonal shuttle service operated by CARTA and is the only public transit route that travels to IOP. It operates on weekends and select holidays from Memorial Day to Labor Day. These additional visitors further add to the volume of people that IOP attracts during the summer months. Shuttle riders are typically heavily reliant on the local pedestrian infrastructure to travel between destinations. The shuttle stop is at the Isle of Palms County Park and connects to Mt Pleasant’s Town Center/Market Center Boulevard. 17 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 STREET OWNERSHIP & MAINTENANCE Most streets are owned and maintained by the state, including key routes like Palm Boulevard, Waterway Boulevard, and the IOP Connector. Most of the private streets are within the Wild Dunes resort area. Federal State County Private Public ROADWAY NETWORK & PARKING LOCATIONS A majority of streets are local roads that serve the predominantly residential areas of the island and are typically characterized by having high (vehicular) accessibility, but low (vehicular) mobility. Streets On-Street Parking Right of Way Parking Municipal Parking Lot PARKING FACILITIES There are numerous dedicated parking facilities located across the island. They include: • Municipal Parking Lots on Pavilion Drive • Front Beach On-Street Parking • Public Road Right-of-Ways • 3rd Avenue between Ocean Boulevard and Charleston Boulevard • East side of 4th Avenue between Ocean Boulevard and Charleston Boulevard • 5th Avenue, between Ocean Boulevard and Carolina Boulevard • 6th Avenue, between Ocean Boulevard and Carolina Boulevard • 7th Avenue, between Ocean Boulevard and Carolina Boulevard • East side of 8th Avenue, between Ocean Boulevard and Carolina Boulevard • East side of 9th Avenue, between Ocean Boulevard and Carolina Boulevard • Palm Boulevard between 21st Avenue and 40th Avenue • Palm Boulevard between 42nd Avenue and 53rd Avenue 2026 MOBILITY STUDY 18 CITY OF ISLE OF PALMS 08/17/26 ACTIVE TRANSPORTATION Active modes of transportation - including human-powered forms of travel such as walking and biking - are essential for coastal communities to provide alternative ways for both residents and visitors to move throughout and access different parts of the community. This is particularly important during the summer months to help alleviate the seasonal traffic congestion and reduce the strain on parking facilities. In addition, commercial areas, like Front Beach, heavily rely on high volumes of foot traffic. This makes pedestrian safety infrastructure, easily accessible storefronts, and overall walkability crucial for supporting the local island’s economy. SIDEWALK INFRASTRUCTURE Sidewalks are a crucial part of IOP’s overall transportation network, providing pedestrians, cyclists, and other non-motorists with dedicated public space and safe travel routes. However, not all streets require sidewalks. Lower density areas, like most of IOP’s residential areas, often lack the consistent volume and safety concerns needed to warrant the infrastructure investment. This is in contrast with the Front Beach area which experiences higher and more consistent foot traffic volumes - particularly during the summer months. Most of the streets in Front Beach have sidewalks on at least one side which supports the areas commercial businesses. There are currently approximately 8 miles of sidewalk infrastructure across the island (excluding the Wild Dunes area). This includes traditional elevated sidewalks, at-grade sidewalks, and at-grade paved shoulders. A complete inventory of the sidewalks is included as Appendix A of the report. 8 Miles of Sidewalks along 7.5 Miles of Streets 63% 37% were Concrete Pavement Material were Asphalt Pavement Material 12% Exceed the Standard Width Most of which are in the Front Beach Area 5% 62% 33% were identified as in Poor condition were identified as in Ok condition were identified as in Good condition 86% Standard 4-5 Ft Width 2% Under the Standard Width 19 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 SIDEWALK CONDITIONS & IMPEDIMENTS Most of IOP’s sidewalks were assessed as being in “OK” or “Adequate” condition. Areas with higher pedestrian traffic, like Front Beach, typically had better quality sidewalks than other areas across the island. Overgrown Vegetation Sand or Dirt Debris Bumps or Cracks Pieces Missing Potholes Standing Water Uneven Pavement Some of the impediments or obstructions observed included: The most common impediment found across the island was sand and/or dirt covering the sidewalk. While small amounts are expected, there were several instances where the sand was fairly deep, creating an obstacle particularly for those with wheels, such as bikes, scooters, strollers, wagons, etc. A B C D E F G H A B C D E F G H Good Condition Ok Condition Poor Condition SIDEWALK INVENTORY Of the approximately 29 miles of streets in IOP (excluding those in Wild Dunes), only about 7.5 miles of streets have dedicated sidewalk infrastructure on at least one side with Palm, Ocean, and Waterway Boulevards accounting for a bulk of the city’s inventory. Sidewalk on One Side Sidewalk on Both Sides 2026 MOBILITY STUDY 20 CITY OF ISLE OF PALMS 08/17/26 EAST COAST GREENWAY BATTERY 2 BEACH The East Coast Greenway (ECG) is a continuously evolving national multi-use trail system that extends from Maine to the Florida Keys. Currently over 2,600 miles in total length, it comprises of on-road and off-road trails, footpaths, sidewalks, bike lanes, etc. The IOP Connector and Palm Boulevard are segments of the current ECG route as it passes through IOP. Battery 2 Beach (B2B) is an approximately 32-mile long regional multi-use path system created by local advocacy group, Charleston Moves. It connects the Battery in downtown Charleston to three Charleston-area beaches - Folly Beach, Sullivan’s Island, and Isle of Palms - passing through five municipalities. The B2B route on IOP is mostly on Palm, Ocean, and Waterway Boulevards with small segments on Charleston Boulevard and on 3rd, 10th, 14th, and 21st Avenues. BIKE FACILITIES Bike facilities, like sharrows and dedicated bike lanes, are a major component of IOP’s overall transportation system. Although most of the existing bike facilities are currently limited to Palm Boulevard and the IOP Connector, cyclists in other parts of the island utilize the roadway and sidewalks alongside pedestrians and motor vehicles. In 2026, three bike repair stations were installed at the Public Safety Building in Front Beach, Recreation Center, and the Isle of Palms Fire Station 2 near the Marina. These stations were donated to the city by the Law Enforcement Neighborhood Support (LENS) Foundation of Isle of Palms. REGIONAL NETWORKS There are two major multi-use systems that travel through IOP: the East Coast Greenway and Battery 2 Beach. 21 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 Battery 2 Beach East Coast Greenway To Mount Pleasant To Sullivan’s Island EAST COAST GREENWAY Nearly 2 MILES of the ECG runs through IOP BATTERY 2 BEACH About 5.5 MILES of the B2B runs through IOP 2026 MOBILITY STUDY 22 CITY OF ISLE OF PALMS 08/17/26 NETWORK USAGE IOP draws thousands of visitors each day who rely on the local network to move through and access different parts of the island. Understanding who uses the network, how they use it, and for what purpose is essential for developing a system safe and accessible for all users. This analysis can provide insight on current and future demand, helping the city identify priority areas and potential infrastructure needs across the island. 37,000 Total Daily Trips 12,300 Total Daily Trip Takers TAKEN BY RESIDENTS OF IOP 12,300 33% TAKEN BY RESIDENTS OF BCD REGION* 27,600 75% RESIDENTS OF IOP 3,600 29% RESIDENTS OF BCD REGION* 9,700 79% In Fall 2025, there were an estimated 37,000 total daily trips that either originated, ended, or passed through IOP’s transportation system. These trips were made by nearly 12,300 trip takers. This includes everyday trips taken by IOP residents and locals going the beach as well as tourists and vacationers visiting the island and commercial deliveries to businesses. A majority of trips on the island were taken by residents of the BCD Region. An estimated 29% of the total Trip Takers were local IOP residents while another 50% were residents of the BCD Region. IOP Trip Takers accounted for roughly one-third of all trips taken on the island. * Includes IOP Residents TRANSPORTATION MODE OF TRIPS Over half (55%) of all trips were private vehicles with another 29% being Auto Passengers. The breakdown of trips by driving (Private Auto) shows that only about 12% of trips were generated by Regional Visitors - that most trips are from IOP Residents and daily visits by BCD Residents. Trips by Walking and Biking were much more evenly distributed by IOP Residents, BCD Residents, and Regional Visitors. Other Modes of Transportation, including On-Demand and Public Transit, accounted for less than 1% of trips. Data Source: Replica Network Link Volumes, Fall 2025 - 6,000 12,000 18,000 24,000 Private Auto Passenger Biking Walking Commercial Total IOP Residents Total IOP Residents BCD Residents Regional Visitors 23 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 0 2000 4000 6000 8000 10000 12000 14000 < 1 1 - 2 2 - 5 5 - 10 10 - 20 > 20 Miles Total IOP Residents 0 2000 4000 6000 8000 10000 12000 14000 16000 < 10 10 - 19 20 - 29 30 - 44 45 - 59 > 60 Minutes Total IOP Residents TRIP PURPOSE Traveling home is the most frequent trip purpose as residents and visitors ultimately return home following their other daily activities. In addition, going home is not limited to certain age groups as opposed to work and school which is geared more towards working aged adults and kids respectively. 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 Home Shop Work Eat Social Recreation LodgingErrands Commercial SchoolOther Departure Total IOP Residents TRIP DISTANCE Visitors accounted for a significant share of medium and long distance trips. This is expected as IOP’s beaches attract people from across the region and beyond. TRIP DURATION About two-thirds of trips taken by IOP residents were under 20 minutes. Data Source: Replica Network Link Volumes, Fall 2025 Data Source: Replica Network Link Volumes, Fall 2025 Data Source: Replica Network Link Volumes, Fall 2025 2026 MOBILITY STUDY 24 CITY OF ISLE OF PALMS 08/17/26 WALK COUNTS < 500 501 - 1000 1001 - 2000 2000 - 3000 > 3000 Some of the highest walk counts outside of the Wild Dunes area were along Palm and Ocean Boulevards - likely a result of people parking along the streets and walking to the beach. Data Source: Strava 2024 Annual Walk Counts BIKE COUNTS < 1000 1001 - 2500 2501 - 5000 5001 - 10000 > 10000 Palm Boulevard between Breach Inlet and the IOP Connector had among the highest bike counts. Most other streets with comparable counts, such as Ocean and Waterway Boulevards, were part of either the ECG or B2B. Data Source: Strava 2024 Annual Bike Counts TOTAL TRIPS BY STREET SEGMENTS < 500 Trips 501 - 1000 Trips 1001 - 2500 Trips 2501 - 5000 Trips 5000 - 10000 Trips > 10000 Trips The IOP Connector experiences the highest daily trip volume likely due to it being the primary ingress and egress route onto the island. Palm Boulevard also experiences high daily trip volumes as it is the main corridor for beach goers. Data Source: Replica Network Link Volumes, Fall 2025 25 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 This page was intentionally left blank. 2026 MOBILITY STUDY 26 CITY OF ISLE OF PALMS 08/17/26 SAFETY CONDITIONS Developing a transportation network with a strong sense of safety for both motorists and non- motorists is crucial for cultivating a more connected and mobile future. IOP’s function as a beach community adds to this challenge as the city experiences significant influxes of visitors who are often unfamiliar with local traffic patterns, routes, and key intersections and/or crossings. This makes safety improvements, such as crosswalks, pedestrian yield signs or signals, and ADA infrastructure, particularly important to reduce the risk of crashes and ensure safety for all people. SAFETY IMPROVEMENTS Most sidewalks on the island have some form of safety improvement. Although safety improvements are needed island wide, a particular focus should be on areas with high foot traffic volume, such as Front Beach and sections of Palm Boulevard. Vegetated Buffer Unvegetated Wide Buffer Elevated Sidewalks Truncated Domes Parked Cars Buffer Curb Cuts Unvegetated Thin Buffer Delineated Crosswalks The different types of safety infrastructure around the island included: A B C D E F G H A B C E H G D F Good Condition Ok Condition Poor Condition 27 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 CROSSWALKS & INTERSECTIONS Most of the marked crosswalks are in the Front Beach area and along Palm Boulevard. There are two types of crosswalks most commonly used on the island: the standard crosswalk with simply two parallel lines and the delineated crosswalk which looks like it is made of different materials such as brick. SIDEWALK-STREET CROSSING LOCATIONS Sidewalks Marked Crossing Unmarked Crossing Although there are a few marked crossings along Palm Boulevard, most of the side street crossings remained unmarked. 2026 MOBILITY STUDY 28 CITY OF ISLE OF PALMS 08/17/26 RECENT VEHICULAR CRASHES All Crashes (335 Total) Crash Involving Pedestrian (6 Total) Crash Involving Cyclist (4 Total) Over half (52%) of all crashes reported between 2019 and 2024 were along Palm Boulevard. This includes 8 of the 10 crashes that involved either a pedestrian or cyclist. RECENT CRASH HISTORY Crash history can provide insight into the safety conditions of the community as well as reveal any high risk areas. Between 2019 and 2024, there were 335 total crashes reported on the island. This is equivalent to about one crash every 5.5 days. The frequency of crashes was expectedly higher during the summer months when the island experiences an influx of visitors. There were 10 total reported crashes that involved non- motorists: six pedestrians and four cyclists. The reported probable cause of the crash for four of the ten crashes were driver distraction with another three being failure to yield the right of way. Data Source: SCDOT Crash Reports, 2019- 2024 0 10 20 30 40 50 60 70 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec TOTAL CRASHES BY MONTH 335 TOTAL CRASHES REPORTED BETWEEN 2019 AND 2024 57 CRASHES IN 2019 63 CRASHES IN 2020 57 CRASHES IN 2021 56 CRASHES IN 2022 64 CRASHES IN 2023 38 CRASHES IN 2024 Number of crashes peak during the Summer months 29 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 No Injury Possible Injury Minor Injury Serious Injury Fatal 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% Distracted Impaired Speeding Wet Road Surface Nighttime Weather Conditions % of Total Crashes 0 25 50 75 100 125 Non-Collision Other Head On Sideswipe (Opposite Direction) Sideswipe (Same Direction) Backed Into Angle Read End Collision Type COLLISION TYPE Most crashes typically involve some sort of collision. The type of collision can provide insight into larger safety concerns. Rear End collisions (36% of all crashes) and Angle collisions (19% of all crashes) are commonly attributed to speeding, high traffic congested areas, and unsafe intersections. MAXIMUM INJURY SUSTAINED A majority of all crashes between 2019 and 2024 resulted in no injury. Only one reported crash over the six-year period resulted in a fatality. This incident was one of the six crashes involving a pedestrian. CONTRIBUTING FACTORS There are numerous contributing factors that can influence the likelihood of a crash, some self- inflicting like driving impaired and speeding while others are more environmental, like weather conditions and time of day. Overall, approximately two-thirds of all crashes involved one or more of the contributing factors listed below. 2026 MOBILITY STUDY 30 CITY OF ISLE OF PALMS 08/17/26 NEEDS ASSESSMENT The needs assessment was a critical step in the planning process, shaping the direction of all subsequent steps, including the identification of recommended projects and the development of the project scoring criteria. A running list of needs was continuously maintained throughout the planning process and includes those identified during the field survey and public engagement process. Some of the reoccurring topics that emerged from the needs assessment include improving accessibility, comfort, safety, connectivity, resiliency, traffic mitigation, maintenance, and multi-modal options across the island. A list of over 60 projects and other needed improvements were initially identified and later consolidated into 56 recommended projects. They are centered around improving and expanding infrastructure to better connect destinations, improve safety, and encourage walkability. These projects were categorized into six Project Types based on the type of improvement. Maps illustrating the locations of the recommended projects by project type are provided on the following pages. 10 BIKE FACILITIES 9 NEW SIDEWALKS 19 CROSSWALKS & INTERSECTIONS 3 PLANNING 8 SIDEWALK IMPROVEMENTS 7 OTHER PROJECTS A matrix of the identified projects was created and continuously updated throughout the remainder of the planning process. It outlines project details such as project type, segment endpoints (location), and project origin - whether identified from the field survey, public engagement, or both. The matrix was vetted with IOP City Staff prior to the project scoring and prioritization process to ensure the viability of the projects and whether they align with the city’s mobility goals. The final recommended project matrix was summarized and included as Appendix B. Projects or needed improvements that were consolidated may have included those that the city identified as not necessary or redundant, overlapping projects, similar projects but at various locations, and projects that may already be underway. PROJECT SCORING The project scoring criteria was developed to provide a technical score to the identified projects based on several key factors related to mobility, including accessibility, safety, connectivity, universal design/conditions, and project feasibility as well as other considerations. Most of the metrics used for the project scoring originated from the Data Collection & Analysis step of the planning process. This includes results from public engagement and most of the data and information outlined in the Existing Condition section - particularly the evaluations and observations from the field survey. 31 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 PROJECT SCORING CRITERIA KEY FACTORS MAX SCORE METRIC DATA SCORING Accessibility 5 Proximity & Access to Activity Generators Points of Interest/ Activity Generators Within Quarter Mile (5); Partially (3); No (0) Safety 15 Crash Clusters SCDOT Crash History Cluster (5); Multiple-but spread out along corridor (3); Single (1); None (0) Unsafe Street Segments Public Survey Results > 5 Comments (5); 3-5 Comments (3); 1-2 Comments (1); None (0) Unsafe Intersections Public Survey Results > 5 Comments (5); 3-5 Comments (3); 1-2 Comments (1); None (0) Connectivity 16 Gaps in Network Identified Gaps from Field Survey Yes (5); No (0) Volume Annual Walk Counts > 2000 (3); 1000-2000 (1); < 1000 (0) Annual Bike Counts > 5000 (3); 2500-5000 (1); > 2500 (0) Needed Infrastructure Public Survey Results > 5 Comments (5); 3-5 Comments (3); 1-2 Comments (1); None (0) Universal Design/ Condition 15 ADA Accessible Sidewalk Inventory Not Accessible (3); Accessible (0) Sidewalk Width Sidewalk Inventory Narrow (3); Adequate Width (0) Pavement Condition Sidewalk Inventory Poor (3); Ok (1); Good (0) Maintenance/ Impediments Observations from Field Survey Multiple (3); Yes (1); None (0) Evidence of/Susceptible to Flooding Observations from Field Survey Yes (3); No (0) Project Feasibility 8 Cost Estimates < $1M (5); > $1M (0) Requires Acquisition of Right of Way County Parcel Data No (3); Yes (0) Other Considerations 9 Overlapping Projects Yes (3); No (0) Mentioned in Previous Plans Yes-Project Specifically Mentioned (3); Yes-General Project Idea Mentioned (1); Not Mentioned (0) Part of Regional Network Regional Bike Routes Yes (3); No (0) Priorities 10 Planning Commission Priority Identified by PC (10); Not Identified (0) Max Total Score 78 Not all projects were assigned a score for each metric. For example, the metrics under Universal Design/Conditions are based on field survey results assessing existing sidewalk infrastructure and, therefore, are not applicable to projects involving new sidewalk infrastructure. A preliminary project score consisting only of the analytical scoring that relied on the data, information, and results collected throughout the planning process was presented to IOP’s Planning Commission in Summer 2026. They were tasked with identifying priorities for the future which was included as an additional consideration in the scoring criteria. 2026 MOBILITY STUDY 32 CITY OF ISLE OF PALMS 08/17/26 A5 A3 A7 A4 A10A8 A1 A9 A2 A6 BIKE FACILITIES MAP LABEL RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT SCORE A1 Restripe existing Bike Lane markings along Palm Blvd Breach Inlet IOP Connector 56 A2 Add a Bike Lane along Ocean Blvd, Charleston Blvd and 14th Ave to follow B2B Route Ocean Blvd Dead End IOP Connector 35 A3 Add a Bike Lane along JC Long Blvd Ocean Blvd Palm Blvd 25 A4 Extend dedicated Bike Lane along Palm Blvd 10th Ave IOP Connector 45 A5 Extend Bike Lane along both sides of IOP Connector to fully connect with Palm and front beach End of Bridge Palm Blvd 53 A6 Add a Bike Lane along Palm Blvd heading north IOP Connector 41st Ave 53 A7 Add Bike Infrastructure along 21st Ave Palm Blvd Waterway Blvd 29 A8 Add a Bike Lane along Hartnett Blvd 22nd Ave 41st Ave 22 A9 Add a Bike Lane along Waterway Blvd 21st Ave 41st Ave 51 A10 Add a Bike Lane along 41st Ave Palm Blvd Marina 38 33 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 B2B1 B12 B14 B6 B7 B17B12 B13 B11 B3 B4 B16B10B9 B8B5 B10 B15 CROSSWALKS & INTERSECTIONS MAP LABEL RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT SCORE B1 Mark Crosswalks to Beach Access Points along Ocean Blvd Beach Access 1B Beach Access 9 25 B2 Improve Markings and potentially add pedestrian Signage/Signals along Ocean Blvd in Front Beach 10th Ave 14th Ave 27 B3 New Crosswalk at JC Long Blvd and Palm Blvd Intersection Point at Intersection 34 B4 New Crosswalk near Public Safety Building along JC Long Blvd Point at Crosswalk 20 B5 New Crosswalk near City Hall along Palm Blvd Point at Crosswalk 30 B6 IOP Connector Crosswalk & Intersection overall Improvement Point at Intersection 53 B7 New Crossing with Signage/Signals at Palm Blvd and 20th Avenue Point at Intersection 42 B8 Improve Crosswalk Safety and Visibility at 21st Ave and Palm Blvd Intersection Point at Intersection 42 B9 Improve Crosswalk Safety potentially with new signage/ signals along Palm Blvd at Beachside Ave Point at Intersection 21 B10 Improve markings and potentially add pedestrian Signage/Signals at 25th Ave and Palm intersection Point at Intersection 25 B11 New Crosswalk at Waterway Blvd and 28th Ave Point at Intersection 23 B12 New Crosswalks at 29th Ave and both Palm Blvd and Waterway Blvd Intersections Point at Intersections 25 B13 New Crosswalk with Signage/Signals at 41st Ave Beach Access Point at Crosswalk 19 B14 Intersection Improvement at Palm Blvd and 41st Ave Point at Intersection 27 B15 Improve Crosswalk at Waterway Blvd and 41st Ave Point at Intersection 27 B16 Improve Crosswalk Markings at Palm Blvd and 43rd Ave Intersection Point at Intersection 26 B17 Improve Crosswalks at Palm Blvd and Wild Dunes Entrance Gate (46th) Point at Intersection 26 N/A Consistent Crosswalk Markings across all Side Streets Various Locations (Not Mapped) 25 2026 MOBILITY STUDY 34 CITY OF ISLE OF PALMS 08/17/26 C2 C1 C5 C6 C4 C3 SIDEWALK IMPROVEMENTS MAP LABEL RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT SCORE C1 Widen Sidewalk along Ocean Blvd & 14th Ave in Front Beach Commercial Area 10th Ave IOP Connector 28 C2 Widen Sidewalk along 21st Street Palm Blvd Waterway Blvd 22 C3 Improve Sidewalk along all of Waterway Blvd 21st Ave 41st Ave 43 C4 Widen Sidewalk along Palm Blvd 21st Ave 41st Ave 52 C5 Improve shoulder with a sidewalk along 41st Ave Palm Blvd Marina 27 C6 Widen Sidewalk along Palm Blvd 41st Ave 57th Ave 26 N/A Continuous Maintenance, Removal or Enforcement of Obstructions Islandwide (Not Mapped) 12 N/A Repair Cracked, Damaged, Eroded, or Uneven Sidewalk Segments Islandwide (Not Mapped) 12 35 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 D3 D4 D5 D7 D9 D2 D8 D1 D6 D6 D6 D6 D6 D6 NEW SIDEWALKS MAP LABEL RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT SCORE D1 Extend Sidewalk along Palm Blvd Carolina Blvd 10th Ave 37 D2 Extend Sidewalk along Ocean Blvd Beach Access 1B Beach Access 6 27 D3 Sidewalk Extension along JC Long Blvd to Ocean Blvd End of Sidewalk Ocean Blvd 29 D4 New and Extend Sidewalk along IOP Connector End of Bridge Palm Blvd 48 D5 New Sidewalk/Multi-Use Path that connects Hartnett Blvd to 21st Ave 21st Ave 22nd Ave 14 D6 Connect Crosswalks to Existing Sidewalk Infrastructure along Palm Blvd Various Locations 39 D7 New Sidewalk along 28th Ave from Waterway to back of Recreation Center Rec Center Waterway Blvd 26 D8 New Sidewalks around the Recreation Center Block Various Segments 13 D9 New Sidewalk along 34th Ave to connect Palm with Forest Trail Palm Blvd Forest Trail 20 2026 MOBILITY STUDY 36 CITY OF ISLE OF PALMS 08/17/26 E3 E1 E2 PLANNING MAP LABEL RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT SCORE E1 Conduct a Road Diet Study along Palm Boulevard between Breach Inlet and the Connector Breach Inlet IOP Connector Not Scored E2 Evaluate feasibility of adding a bus pull off at pedestrian entrance to County Park Point at Transit Stop Not Scored E3 Evaluate Feasibility of New Multi-Use Path in ROW connecting 13th Ave to 20th Ave (along Cassina Ave) 13th Ave 20th Ave Not Scored 37 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 F3 F4 F2 F1 F2 F7 F1 F5 F5 F5 F5F5 F1 F1 F1 F2 F2 F2 F6 F6 OTHER PROJECTS MAP LABEL RECOMMENDED PROJECT SEGMENT ENDPOINT 1 SEGMENT ENDPOINT 2 PROJECT SCORE F1 Add Bike/Ped Amenities or Golf Cart Parking at Major Destination Points Various Locations 19 F2 Add Street Lights along streets or at certain intersections and/or crosswalks Various Locations 18 F3 Pave Off-Road Path parallel to Palm Blvd sidewalk connecting to Bunch Park Cassina Ave 20th Ave 16 F4 Pave Off-Road Path/goat path adjacent to parking along southside of Palm Blvd at 21st Ave curve 21st Ave curve 21st Ave 19 F5 Add Bike/Ped Amenities near Beach Access Points Various Locations 18 F6 Ensure beach access at 25th Ave and 34A are ADA accessible/graded or mats Point at Intersections 32 F7 Sidewalk Drainage Project along Palm Blvd 36th Ave 41st Ave 24 2026 MOBILITY STUDY 38 CITY OF ISLE OF PALMS 08/17/26 PRIORITY PROJECT AREAS There were five recommended priority project areas identified for the city to implement as funding becomes available. These areas include most of the major roadways throughout IOP, including the IOP Connector, Palm Boulevard, and Waterway Boulevard. Each priority area includes a list of Quick Build Improvements and Enhanced Improvements along with cost estimates to help inform and guide future decision-making. ENHANCED IMPROVEMENTS: A list of recommended projects that would enhance the mobility, safety, connectivity, and/or accessibility of the project area. This list is intended to encompass projects that would typically require a higher level of planning and coordination to implement. QUICK BUILD IMPROVEMENTS: A list of recommended projects that the city and partner agencies can quickly implement to improve a more immediate safety, mobility, connectivity, and/or accessibility need. Note – Planning level cost estimates are based on a limited availability of project details and are developed using broad unit cost assumptions derived from historical bids on similarly scoped micromobility projects in the BCD region. Actual project costs may vary significantly based on future refinement of project scopes and advancement of projects to include detailed engineering, traffic studies, survey, utility, right-of-way and adjusted construction costs based on future market conditions, inflation, etc. 39 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 PROJECT AREA A PALM BOULEVARD IMPROVEMENTS (BREACH INLET TO IOP CONNECTOR) ENHANCED IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS A1 Restripe existing bike facilities along Palm Blvd Project Score: 56 D1 Extend sidewalk along Palm Blvd Project Score: 37 Includes replacing existing bike lane symbols, sharrow and chevron markings, numerous high visibility ladder crosswalks, 5-ft concrete sidewalks, 8-ft wooden boardwalks, and ADA access infrastructure ESTIMATED PROJECT COSTS: $ 2,400,000 QUICK BUILD IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS A1 Restripe existing bike facilities along Palm Blvd Project Score: 56 Includes replacing existing bike lane symbols, sharrow and chevron markings, and numerous high visibility ladder crosswalks ESTIMATED PROJECT COSTS: $ 185,000 2026 MOBILITY STUDY 40 CITY OF ISLE OF PALMS 08/17/26 PROJECT AREA B IOP CONNECTOR & INTERSECTION ENHANCED IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS A5 Extend bike lanes along both sides of IOP Connector to connect with existing facilities/infrastructure Project Score: 53 B6 Improve crosswalks and overall accessibility at IOP Connector intersection Project Score: 53 D4 Extend sidewalk along IOP Connector to Palm Blvd Project Score: 48 Includes extending green bike lanes, numerous high visibility ladder crosswalks, 5-ft concrete sidewalks, and concrete pedestrian island(s) ESTIMATED PROJECT COSTS: $ 650,000 QUICK BUILD IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS A5 Extend bike lanes along both sides of IOP Connector to connect with existing facilities/infrastructure Project Score: 53 B6 Improve crosswalks and overall accessibility at IOP Connector intersection Project Score: 53 Includes extending green bike lanes and numerous high visibility ladder crosswalks ESTIMATED PROJECT COSTS: $ 65,000 41 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 PROJECT AREA C INTERSECTION IMPROVEMENTS AT PALM BOULEVARD “S-CURVE” ENHANCED IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS B7 Improve crosswalk safety by adding signage/signals at Palm Blvd & 20th Ave Project Score: 42 B8 Improve crosswalk safety and visibility at Palm Blvd & 21st Ave intersection Project Score: 42 Includes high visibility ladder crosswalks, white yield/ chevron markings, rectangular rapid flashing beacon (RRFB), and signs & posts ESTIMATED PROJECT COSTS: $ 90,000 QUICK BUILD IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS B7 Improve crosswalk safety by adding signage/signals at Palm Blvd & 20th Ave Project Score: 42 B8 Improve crosswalk safety and visibility at Palm Blvd & 21st Ave intersection Project Score: 42 Includes high visibility ladder crosswalks, white yield/ chevron markings, and signs & posts ESTIMATED PROJECT COSTS: $ 55,000 2026 MOBILITY STUDY 42 CITY OF ISLE OF PALMS 08/17/26 PROJECT AREA D PALM BOULEVARD IMPROVEMENTS (IOP CONNECTOR TO 41ST AVE) ENHANCED IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS A6 Add bike facility along Palm Blvd heading north Project Score: 53 C4 Widen sidewalk (or make into a Multi-Use Path) along Palm Blvd Project Score: 52 D6 Connect crosswalks to existing sidewalks along Palm Blvd Project Score: 39 Includes new sharrow & chevron markings and 5-ft concrete sidewalks ESTIMATED PROJECT COSTS: $ 1,300,000 QUICK BUILD IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS A6 Add bike facility along Palm Blvd heading north Project Score: 53 D6 Connect crosswalks to existing sidewalks along Palm Blvd Project Score: 39 Includes new sharrow & chevron markings and 5-ft concrete sidewalks ESTIMATED PROJECT COSTS: $100,000 43 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 PROJECT AREA E WATERWAY BOULEVARD CONNECTIVITY IMPROVEMENTS ENHANCED IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS A7 Add bike facility along 21st Ave Project Score: 29 A9 Add bike facility along Waterway Blvd Project Score: 51 A10 Add bike facility along 41st Ave Project Score: 38 B11 New crosswalk across Waterway Blvd at 28th Ave Project Score: 23 B15 Improve crosswalks at Waterway Blvd and 41st Ave Project Score: 27 D7 New sidewalk along 28th Ave from Waterway Blvd to the IOP Recreation Center Project Score: 26 Includes new sharrow & chevron markings, numerous high visibility ladder crosswalks, 5-ft concrete sidewalks, pedestrian ramps, and detectable warning materials ESTIMATED PROJECT COSTS: $ 125,000 QUICK BUILD IMPROVEMENTS BIKE FACILITIES CROSSWALKS & INTERSECTIONS SIDEWALK IMPROVEMENTS NEW SIDEWALKS PLANNING OTHER PROJECTS B11 New crosswalk across Waterway Blvd at 28th Ave Project Score: 23 B15 Improve crosswalks at Waterway Blvd and 41st Ave Project Score: 27 D7 New sidewalk along 28th Ave from Waterway Blvd to the IOP Recreation Center Project Score: 26 Includes numerous high visibility ladder crosswalks, 5-ft concrete sidewalks, pedestrian ramps, and detectable warning materials ESTIMATED PROJECT COSTS: $ 105,000 08/17/26 2026 MOBILITY STUDY 44CITY OF ISLE OF PALMS APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 112 Palm Blvd Jasper Blvd Charleston Blvd Both Sides Discontinues at One End 5 feet Yes Concrete Good (3) Concrete Curb 113 Palm Blvd Jasper Blvd Charleston Blvd Both Sides Both Ends 5 feet Yes Concrete Good (3) Concrete Curb 114 Palm Blvd Charleston Blvd Carolina Blvd One side Discontinues at One End 6 feet Yes Concrete Good (3) Concrete Curb 115 Palm Blvd 9th Ave 10th Ave One side Transitions into Paved Shoulder 5 feet Yes Concrete Ok (2) Concrete Curb Cracked or Raised Surface; Overgrown Landscaping/Vegetation Changes to asphalt at end for approximately 200 ft. Stops in front of 901 116 Palm Blvd Parking Lot 10th Ave Both Sides Discontinues Before End 5 feet Yes Concrete Ok (2) Bike Lane 121 Palm Blvd 10th Ave Carolina Blvd Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Over Hanging Limbs Raised uneven surface, Cracks 122 Palm Blvd 10th Ave Carolina Blvd Both Sides Both Ends 5 feet Yes Concrete Ok (2) Bike Lane 123 Palm Blvd Carolina Blvd 12th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping Bike lane 120 Palm Blvd Carolina Blvd 12th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping Raise surfaces Hanging Limbs 119 Palm Blvd 12th Ave City Hall Both Sides Both Ends 5 feet Yes Concrete Ok (2) Cracked or Raised Surface 124 Palm Blvd 12th Ave 14th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Bike lane 118 Palm Blvd City Hall 13th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping 117 Palm Blvd 13th Ave Parking Lot Both Sides Both Ends 10 feet Yes Concrete Good (3) Concrete Curb 125 Palm Blvd 14th Ave Ocean Park Plaza Entrance Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes only at one end Sand/Dirt Covering Sidewalk 126 Palm Blvd Ocean Park Plaza Entrance Ocean Park Plaza Entrance Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Sand/Dirt Covering Sidewalk 127 Palm Blvd Ocean Park Plaza Entrance 21st Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Ends with no crosswalk 143 Palm Blvd Parking Lot IOP Connector Both Sides Both Ends 10 feet Yes Concrete Good (3) Concrete Curb 179 Palm Blvd IOP Connector IOP Connector Turn Lane Both Sides Both Ends 5 feet Yes Concrete Good (3) Curb Cut & Truncated Domes 6 Palm Blvd IOP Connector Turn Lane Island Center Entrance Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes 5 Palm Blvd Island Center Entrance Island Center Entrance Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes 4 Palm Blvd Island Center Entrance Cassina Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes Overgrown Landscaping 3 Palm Blvd Cassina Ave 20th Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes 2 Palm Blvd 20th Ave 21st Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes 156 Palm Blvd 21st Ave Parking Lot Both Sides Both Ends 4.5 feet Yes Concrete Ok (2) Concrete Curb Truncated Domes only at one end Cracked or Raised Surface Raised above street level; Current plan in place to extend and improve sidewalk on 21st ave 155 Palm Blvd Parking Lot Palm Blvd One side Both Ends 4 feet No Asphalt Poor (1) Sand/Dirt Covering Sidewalk This segment of 21st abruptly stops and turns into an asphalt shoulder. Current plan in place to extend and improve sidewalk on 21st ave 45 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 112 Palm Blvd Jasper Blvd Charleston Blvd Both Sides Discontinues at One End 5 feet Yes Concrete Good (3) Concrete Curb 113 Palm Blvd Jasper Blvd Charleston Blvd Both Sides Both Ends 5 feet Yes Concrete Good (3) Concrete Curb 114 Palm Blvd Charleston Blvd Carolina Blvd One side Discontinues at One End 6 feet Yes Concrete Good (3) Concrete Curb 115 Palm Blvd 9th Ave 10th Ave One side Transitions into Paved Shoulder 5 feet Yes Concrete Ok (2) Concrete Curb Cracked or Raised Surface; Overgrown Landscaping/Vegetation Changes to asphalt at end for approximately 200 ft. Stops in front of 901 116 Palm Blvd Parking Lot 10th Ave Both Sides Discontinues Before End 5 feet Yes Concrete Ok (2) Bike Lane 121 Palm Blvd 10th Ave Carolina Blvd Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Over Hanging Limbs Raised uneven surface, Cracks 122 Palm Blvd 10th Ave Carolina Blvd Both Sides Both Ends 5 feet Yes Concrete Ok (2) Bike Lane 123 Palm Blvd Carolina Blvd 12th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping Bike lane 120 Palm Blvd Carolina Blvd 12th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping Raise surfaces Hanging Limbs 119 Palm Blvd 12th Ave City Hall Both Sides Both Ends 5 feet Yes Concrete Ok (2) Cracked or Raised Surface 124 Palm Blvd 12th Ave 14th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Bike lane 118 Palm Blvd City Hall 13th Ave Both Sides Both Ends 5 feet Yes Concrete Ok (2) Concrete Curb Overgrown Landscaping 117 Palm Blvd 13th Ave Parking Lot Both Sides Both Ends 10 feet Yes Concrete Good (3) Concrete Curb 125 Palm Blvd 14th Ave Ocean Park Plaza Entrance Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes only at one end Sand/Dirt Covering Sidewalk 126 Palm Blvd Ocean Park Plaza Entrance Ocean Park Plaza Entrance Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Sand/Dirt Covering Sidewalk 127 Palm Blvd Ocean Park Plaza Entrance 21st Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Ends with no crosswalk 143 Palm Blvd Parking Lot IOP Connector Both Sides Both Ends 10 feet Yes Concrete Good (3) Concrete Curb 179 Palm Blvd IOP Connector IOP Connector Turn Lane Both Sides Both Ends 5 feet Yes Concrete Good (3) Curb Cut & Truncated Domes 6 Palm Blvd IOP Connector Turn Lane Island Center Entrance Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes 5 Palm Blvd Island Center Entrance Island Center Entrance Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes 4 Palm Blvd Island Center Entrance Cassina Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes Overgrown Landscaping 3 Palm Blvd Cassina Ave 20th Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes 2 Palm Blvd 20th Ave 21st Ave Both Sides Both Ends 4.5 feet Yes Concrete Good (3) Concrete Curb Truncated Domes 156 Palm Blvd 21st Ave Parking Lot Both Sides Both Ends 4.5 feet Yes Concrete Ok (2) Concrete Curb Truncated Domes only at one end Cracked or Raised Surface Raised above street level; Current plan in place to extend and improve sidewalk on 21st ave 155 Palm Blvd Parking Lot Palm Blvd One side Both Ends 4 feet No Asphalt Poor (1) Sand/Dirt Covering Sidewalk This segment of 21st abruptly stops and turns into an asphalt shoulder. Current plan in place to extend and improve sidewalk on 21st ave 08/17/26 2026 MOBILITY STUDY 46CITY OF ISLE OF PALMS APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 157 Palm Blvd 21st Ave 22nd Ave One side Both Ends 4.4 feet No Concrete Ok (2) Grass Buffer Some evidence Sand/Dirt Covering Sidewalk Material changes from asphalt to concrete. Golf cart path runs parallel to sidewalk. Material changes to asphalt 7 Palm Blvd 22nd Ave 23rd Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Overgrown Landscaping Material changes to sand on one end 8 Palm Blvd 23rd Ave 24th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Cracked or Raised Surface Materials switch between asphalt, concrete, and concrete with pebbles 9 Palm Blvd 24th Ave 25th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes only at one end Sand/Dirt Covering Sidewalk 10 Palm Blvd 25th Ave 26th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering Sidewalk 11 Palm Blvd 26th Ave 27th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Sand/Dirt Covering Sidewalk The only portion of segment that really made it a 2 was the part where a home was under construction and sand covered the sidewalk and construction equipment also likely damaged it 12 Palm Blvd 27th Ave 28th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Limited evidence at ends of segment Sand/Dirt Covering Sidewalk Very limited encroachment, connection on one end connects to two sidewalks 13 Palm Blvd 28th Ave 29th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering Sidewalk Limited encroachment from sand and dirt, some sharp elevations- pebble material on some surface helps with ada requirement 14 Palm Blvd 29th Ave Palm Ct One side Discontinues Before End 4.5 feet No Concrete Poor (1) Damaged Grass Buffer Truncated Domes Sand/Dirt Covering Sidewalk Additional impediments: overgrown landscaping, cracked sidewalks, and a segment of sidewalk made of sand 15 Palm Blvd Palm Ct 30th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering Sidewalk 16 Palm Blvd 30th Ave 31st Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Some evidence at crossing Truncated Domes Sand/Dirt Covering Sidewalk Overgrown landscape too 17 Palm Blvd 31st Ave 32nd Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering Sidewalk Also cracked sidewalk 18 Palm Blvd 32nd Ave 33rd Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Sand/Dirt Covering Sidewalk Encroachment minor 19 Palm Blvd 33rd Ave 34th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Some evidence at low points Truncated Domes Sand/Dirt Covering Sidewalk Also Overgrown plants and some non level sidewalk parts 20 Palm Blvd 34th Ave 35th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Small evidence in specific portion see photos Truncated Domes Sand/Dirt Covering Sidewalk 21 Palm Blvd 35th Ave 36th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Truncated Domes One small case on encroachment 22 Palm Blvd 36th Ave 37th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Light evidence of flooding Truncated Domes Overgrown Landscaping 23 Palm Blvd 37th Ave 38th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Overgrown Landscaping 24 Palm Blvd 38th Ave 39th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Grass Buffer Near crossings Sand/Dirt Covering Sidewalk Condition can arguably be a 3 25 Palm Blvd 39th Ave 40th Ave One side Both Ends 4.2 feet No Concrete Ok (2) Grass Buffer Evident Sand/Dirt Covering Sidewalk 47 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 157 Palm Blvd 21st Ave 22nd Ave One side Both Ends 4.4 feet No Concrete Ok (2) Grass Buffer Some evidence Sand/Dirt Covering Sidewalk Material changes from asphalt to concrete. Golf cart path runs parallel to sidewalk. Material changes to asphalt 7 Palm Blvd 22nd Ave 23rd Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Overgrown Landscaping Material changes to sand on one end 8 Palm Blvd 23rd Ave 24th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Cracked or Raised Surface Materials switch between asphalt, concrete, and concrete with pebbles 9 Palm Blvd 24th Ave 25th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes only at one end Sand/Dirt Covering Sidewalk 10 Palm Blvd 25th Ave 26th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering Sidewalk 11 Palm Blvd 26th Ave 27th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Sand/Dirt Covering Sidewalk The only portion of segment that really made it a 2 was the part where a home was under construction and sand covered the sidewalk and construction equipment also likely damaged it 12 Palm Blvd 27th Ave 28th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Limited evidence at ends of segment Sand/Dirt Covering Sidewalk Very limited encroachment, connection on one end connects to two sidewalks 13 Palm Blvd 28th Ave 29th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering Sidewalk Limited encroachment from sand and dirt, some sharp elevations- pebble material on some surface helps with ada requirement 14 Palm Blvd 29th Ave Palm Ct One side Discontinues Before End 4.5 feet No Concrete Poor (1) Damaged Grass Buffer Truncated Domes Sand/Dirt Covering Sidewalk Additional impediments: overgrown landscaping, cracked sidewalks, and a segment of sidewalk made of sand 15 Palm Blvd Palm Ct 30th Ave One side Both Ends 4.4 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering Sidewalk 16 Palm Blvd 30th Ave 31st Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Some evidence at crossing Truncated Domes Sand/Dirt Covering Sidewalk Overgrown landscape too 17 Palm Blvd 31st Ave 32nd Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Truncated Domes Sand/Dirt Covering Sidewalk Also cracked sidewalk 18 Palm Blvd 32nd Ave 33rd Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Sand/Dirt Covering Sidewalk Encroachment minor 19 Palm Blvd 33rd Ave 34th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Some evidence at low points Truncated Domes Sand/Dirt Covering Sidewalk Also Overgrown plants and some non level sidewalk parts 20 Palm Blvd 34th Ave 35th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Small evidence in specific portion see photos Truncated Domes Sand/Dirt Covering Sidewalk 21 Palm Blvd 35th Ave 36th Ave One side Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Truncated Domes One small case on encroachment 22 Palm Blvd 36th Ave 37th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Light evidence of flooding Truncated Domes Overgrown Landscaping 23 Palm Blvd 37th Ave 38th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Parking Buffer Overgrown Landscaping 24 Palm Blvd 38th Ave 39th Ave One side Both Ends 4.5 feet No Concrete Ok (2) Grass Buffer Near crossings Sand/Dirt Covering Sidewalk Condition can arguably be a 3 25 Palm Blvd 39th Ave 40th Ave One side Both Ends 4.2 feet No Concrete Ok (2) Grass Buffer Evident Sand/Dirt Covering Sidewalk 08/17/26 2026 MOBILITY STUDY 48CITY OF ISLE OF PALMS APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 26 Palm Blvd 40th Ave 41st Ave One side Both Ends 4.2 feet No Concrete Ok (2) Grass Buffer Evident Overgrown Landscaping 27 Palm Blvd Beach Access 41 Palm Blvd Both Sides Discontinues at One End 4.45 feet Yes Concrete Good (3) Concrete Curb No rumble strips, crosswalk present Cracked or Raised Surface Elevation changes on sidewalk 28 Palm Blvd Palm Blvd Cameron Blvd Both Sides Both Ends 5 feet No Concrete Ok (2) Grass Buffer Strips and marked crossing Cracked or Raised Surface Connects to Cameron blvd- some encroachment as well 29 Palm Blvd 41st Ave 42nd Ave One side Both Ends 4 feet Yes Concrete, Asphalt, Sand (West to East) Poor (1) Damaged Grass Buffer Truncated Domes 30 Palm Blvd 42nd Ave 43rd Ave One Side Both Ends 5.3 feet No Asphalt Ok (2) Concrete Curb Truncated Domes 31 Palm Blvd 43rd Ave 44th Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Concrete Curb Truncated Domes 32 Palm Blvd 44th Ave 45th Ave One side Both Ends 5.3 feet No Asphalt Good (3) Grass Buffer Truncated Domes 33 Palm Blvd 45th Ave 46th Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 34 Palm Blvd 46th Ave 47th Ave One side Both Ends 4.75 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 35 Palm Blvd 47th Ave 48th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 36 Palm Blvd 48th Ave 49th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 37 Palm Blvd 49th Ave 50th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 144 Palm Blvd 50th Ave Driveway One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 145 Palm Blvd Driveway 51st Ave One side Both Ends 4.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 38 Palm Blvd 51st Ave 52nd Ave One side Both Ends 4.6 feet No Asphalt Ok (2) Grass Buffer Overgrown Landscaping 39 Palm Blvd 52nd Ave 53rd Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer 146 Palm Blvd 53rd Ave 54th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Rumble strip both ends Cracked or Raised Surface Crosswalk at 53rd Ave 147 Palm Blvd 54th Ave 55th Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Cracked or Raised Surface Crosswalk at Beach Access 54 40 Palm Blvd 55th Ave 56th Ave One side Both Ends 5 feet No Asphalt Ok (2) Damaged Grass Buffer Over Hanging Limbs 41 Palm Blvd 56th Ave 57th Ave One side Both Ends 5 feet No Asphalt Good (3) Grass Buffer 182 IOP Connector Palm Blvd One Side Discontinues at One End 6 Feet Yes Concrete Good (3) Concrete Curb Truncated Domes Extra Long/Wide Curb Cut and Truncated Domes at end 128 Ocean Blvd 6th Ave 7th Ave One side Both Ends 5 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Some sand; Landscaping overgrowth; Low points; Parking buffer; Small surface cracks 129 Ocean Blvd 7th Ave 8th Ave One side Both Ends 5 feet No Concrete Ok (2) Parking Buffer Overgrown Landscaping Grass and parking buffer; Overgrowth landscaping sloping of surface 130 Ocean Blvd 8th Ave 9th Ave One side Both Ends 5 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Sidewalks cracking or are uneven 131 Ocean Blvd 9th Ave 10th Ave One side Discontinues at One End 5 feet No Concrete Good (3) Grass Buffer Over Hanging Limbs Splits at end into retail area 181 Ocean Blvd 10th Ave JC Long Blvd Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Sand/Dirt Covering Sidewalk 132 Ocean Blvd JC Long Blvd Parking Lot Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Sand/Dirt Covering Sidewalk 134 Ocean Blvd JC Long Blvd Pavilion Dr Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Truncated Domes only at one end 49 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 26 Palm Blvd 40th Ave 41st Ave One side Both Ends 4.2 feet No Concrete Ok (2) Grass Buffer Evident Overgrown Landscaping 27 Palm Blvd Beach Access 41 Palm Blvd Both Sides Discontinues at One End 4.45 feet Yes Concrete Good (3) Concrete Curb No rumble strips, crosswalk present Cracked or Raised Surface Elevation changes on sidewalk 28 Palm Blvd Palm Blvd Cameron Blvd Both Sides Both Ends 5 feet No Concrete Ok (2) Grass Buffer Strips and marked crossing Cracked or Raised Surface Connects to Cameron blvd- some encroachment as well 29 Palm Blvd 41st Ave 42nd Ave One side Both Ends 4 feet Yes Concrete, Asphalt, Sand (West to East) Poor (1) Damaged Grass Buffer Truncated Domes 30 Palm Blvd 42nd Ave 43rd Ave One Side Both Ends 5.3 feet No Asphalt Ok (2) Concrete Curb Truncated Domes 31 Palm Blvd 43rd Ave 44th Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Concrete Curb Truncated Domes 32 Palm Blvd 44th Ave 45th Ave One side Both Ends 5.3 feet No Asphalt Good (3) Grass Buffer Truncated Domes 33 Palm Blvd 45th Ave 46th Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 34 Palm Blvd 46th Ave 47th Ave One side Both Ends 4.75 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 35 Palm Blvd 47th Ave 48th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 36 Palm Blvd 48th Ave 49th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 37 Palm Blvd 49th Ave 50th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 144 Palm Blvd 50th Ave Driveway One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 145 Palm Blvd Driveway 51st Ave One side Both Ends 4.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes 38 Palm Blvd 51st Ave 52nd Ave One side Both Ends 4.6 feet No Asphalt Ok (2) Grass Buffer Overgrown Landscaping 39 Palm Blvd 52nd Ave 53rd Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer 146 Palm Blvd 53rd Ave 54th Ave One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Rumble strip both ends Cracked or Raised Surface Crosswalk at 53rd Ave 147 Palm Blvd 54th Ave 55th Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Cracked or Raised Surface Crosswalk at Beach Access 54 40 Palm Blvd 55th Ave 56th Ave One side Both Ends 5 feet No Asphalt Ok (2) Damaged Grass Buffer Over Hanging Limbs 41 Palm Blvd 56th Ave 57th Ave One side Both Ends 5 feet No Asphalt Good (3) Grass Buffer 182 IOP Connector Palm Blvd One Side Discontinues at One End 6 Feet Yes Concrete Good (3) Concrete Curb Truncated Domes Extra Long/Wide Curb Cut and Truncated Domes at end 128 Ocean Blvd 6th Ave 7th Ave One side Both Ends 5 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Some sand; Landscaping overgrowth; Low points; Parking buffer; Small surface cracks 129 Ocean Blvd 7th Ave 8th Ave One side Both Ends 5 feet No Concrete Ok (2) Parking Buffer Overgrown Landscaping Grass and parking buffer; Overgrowth landscaping sloping of surface 130 Ocean Blvd 8th Ave 9th Ave One side Both Ends 5 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Sidewalks cracking or are uneven 131 Ocean Blvd 9th Ave 10th Ave One side Discontinues at One End 5 feet No Concrete Good (3) Grass Buffer Over Hanging Limbs Splits at end into retail area 181 Ocean Blvd 10th Ave JC Long Blvd Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Sand/Dirt Covering Sidewalk 132 Ocean Blvd JC Long Blvd Parking Lot Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Sand/Dirt Covering Sidewalk 134 Ocean Blvd JC Long Blvd Pavilion Dr Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer Truncated Domes only at one end 08/17/26 2026 MOBILITY STUDY 50CITY OF ISLE OF PALMS APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 175 Ocean Blvd 10th Ave Beach Access 13 Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some puddling 180 Ocean Blvd JC Long Blvd Pavilion Dr Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some evident Limited strips Cracked or Raised Surface 133 Ocean Blvd Pavilion Dr 14th Ave Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some evident Limited strips Cracked or Raised Surface 135 Ocean Blvd Pavilion Dr 14th Ave Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer 139 JC Long Blvd Pavilion Dr Palm Blvd One side Discontinues at One End 5 feet No Concrete Good (3) Damaged Grass Buffer 174 JC Long Blvd Ocean Blvd Pavilion Dr One side Discontinues Before End 8 feet No Concrete Good (3) Grass Buffer Some evidence 140 Pavilion Dr Ocean Blvd JC Long Blvd Both Sides Discontinues at One End 8 feet No Concrete Good (3) Grass Buffer Overgrown Landscaping 141 Pavilion Dr Ocean Blvd JC Long Blvd Both Sides Discontinues at One End 5 feet No Concrete Ok (2) Damaged Grass Buffer 136 14th Ave Palm Blvd Maintenance Building Entrance One side Both Ends 5 feet No Concrete Good (3) Grass Buffer 137 14th Ave Maintenance Building Entrance County Park Entrance One side Both Ends 5 feet No Concrete Good (3) Damaged Grass Buffer 138 14th Ave County Park Entrance Ocean Blvd One side Both Ends 5 feet Yes Concrete Good (3) Grass Buffer 173 21st Ave Palm Blvd Parking Lot Both Sides Both Ends 4.5 feet No Concrete Good (3) Concrete Curb Truncated Domes Current plan in place to extend and improve sidewalk on 21st ave 106 21st Ave Parking Lot Waterway Blvd One side Both Ends 4 feet No Asphalt Ok (2) Grass Buffer Some evidence in potholes Relatively smooth- some bumps Sand/Dirt Covering Sidewalk Current plan in place to extend and improve sidewalk on 21st ave 105 Waterway Blvd 21st Ave 22nd Ave One side Discontinues at One End 3.5 feet No Asphalt Ok (2) Grass Buffer 104 Waterway Blvd 22nd Ave 25th Ave One side Both Ends 5 feet No Asphalt Ok (2) Damaged Grass Buffer Cracked or Raised Surface Narrows and winds in places 103 Waterway Blvd 25th Ave Tabby Ln One side Both Ends 5 feet No Asphalt Ok (2) Damaged Grass Buffer Overgrown Landscaping 102 Waterway Blvd Tabby Ln Driftwood Ln One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Overgrown Landscaping 101 Waterway Blvd Driftwood Ln Seahorse Ct One side Both Ends 5 feet No Asphalt Poor (1) Damaged Grass Buffer Cracked or Raised Surface 100 Waterway Blvd Seahorse Ct Ensign Ct One side Both Ends 3.8 feet No Asphalt Poor (1) Damaged Grass Buffer Overgrown Landscaping Lots of debris and hanging limbs. Cracks in surface 99 Waterway Blvd Ensign Ct 29th Ave One side Both Ends 5 feet No Asphalt Poor (1) Damaged Grass Buffer Overgrown Landscaping 166 Waterway Blvd 29th Ave 30th Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Cracked or Raised Surface Asphalt concrete mix. Lowpoints. 98 Waterway Blvd 30th Ave 31st Ave One side Both Ends 4 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Concrete asphalt mix raised unflat surface. Hanging limbs. Separation varies in width. Cracks in surface. 51 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 175 Ocean Blvd 10th Ave Beach Access 13 Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some puddling 180 Ocean Blvd JC Long Blvd Pavilion Dr Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some evident Limited strips Cracked or Raised Surface 133 Ocean Blvd Pavilion Dr 14th Ave Both Sides Both Ends 8 feet Yes Concrete Good (3) Concrete Curb Some evident Limited strips Cracked or Raised Surface 135 Ocean Blvd Pavilion Dr 14th Ave Both Sides Both Ends 5 feet Yes Concrete Good (3) Parking Buffer 139 JC Long Blvd Pavilion Dr Palm Blvd One side Discontinues at One End 5 feet No Concrete Good (3) Damaged Grass Buffer 174 JC Long Blvd Ocean Blvd Pavilion Dr One side Discontinues Before End 8 feet No Concrete Good (3) Grass Buffer Some evidence 140 Pavilion Dr Ocean Blvd JC Long Blvd Both Sides Discontinues at One End 8 feet No Concrete Good (3) Grass Buffer Overgrown Landscaping 141 Pavilion Dr Ocean Blvd JC Long Blvd Both Sides Discontinues at One End 5 feet No Concrete Ok (2) Damaged Grass Buffer 136 14th Ave Palm Blvd Maintenance Building Entrance One side Both Ends 5 feet No Concrete Good (3) Grass Buffer 137 14th Ave Maintenance Building Entrance County Park Entrance One side Both Ends 5 feet No Concrete Good (3) Damaged Grass Buffer 138 14th Ave County Park Entrance Ocean Blvd One side Both Ends 5 feet Yes Concrete Good (3) Grass Buffer 173 21st Ave Palm Blvd Parking Lot Both Sides Both Ends 4.5 feet No Concrete Good (3) Concrete Curb Truncated Domes Current plan in place to extend and improve sidewalk on 21st ave 106 21st Ave Parking Lot Waterway Blvd One side Both Ends 4 feet No Asphalt Ok (2) Grass Buffer Some evidence in potholes Relatively smooth- some bumps Sand/Dirt Covering Sidewalk Current plan in place to extend and improve sidewalk on 21st ave 105 Waterway Blvd 21st Ave 22nd Ave One side Discontinues at One End 3.5 feet No Asphalt Ok (2) Grass Buffer 104 Waterway Blvd 22nd Ave 25th Ave One side Both Ends 5 feet No Asphalt Ok (2) Damaged Grass Buffer Cracked or Raised Surface Narrows and winds in places 103 Waterway Blvd 25th Ave Tabby Ln One side Both Ends 5 feet No Asphalt Ok (2) Damaged Grass Buffer Overgrown Landscaping 102 Waterway Blvd Tabby Ln Driftwood Ln One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Overgrown Landscaping 101 Waterway Blvd Driftwood Ln Seahorse Ct One side Both Ends 5 feet No Asphalt Poor (1) Damaged Grass Buffer Cracked or Raised Surface 100 Waterway Blvd Seahorse Ct Ensign Ct One side Both Ends 3.8 feet No Asphalt Poor (1) Damaged Grass Buffer Overgrown Landscaping Lots of debris and hanging limbs. Cracks in surface 99 Waterway Blvd Ensign Ct 29th Ave One side Both Ends 5 feet No Asphalt Poor (1) Damaged Grass Buffer Overgrown Landscaping 166 Waterway Blvd 29th Ave 30th Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Cracked or Raised Surface Asphalt concrete mix. Lowpoints. 98 Waterway Blvd 30th Ave 31st Ave One side Both Ends 4 feet No Concrete Ok (2) Grass Buffer Overgrown Landscaping Concrete asphalt mix raised unflat surface. Hanging limbs. Separation varies in width. Cracks in surface. 08/17/26 2026 MOBILITY STUDY 52CITY OF ISLE OF PALMS APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 165 Waterway Blvd 31st Ave 32nd Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Smooth- on the one end of segment closest to golf course, there are many cracks Overgrown Landscaping 164 Waterway Blvd 32nd Ave Shady Ln One side Both Ends 4.3 feet No Asphalt Ok (2) Grass Buffer No evidence- maybe for puddling Smooth but too much sand Sand/Dirt Covering Sidewalk 163 Waterway Blvd Shady Ln Oakview Ln One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Smooth surface Sand/Dirt Covering Sidewalk Impediments mainly sand or dirt- could be a condition 3 162 Waterway Blvd Oakview Ln Timber Ln One side Both Ends 5.3 feet No Asphalt Poor (1) Damaged Grass Buffer Surface broken and uneven Sand/Dirt Covering Sidewalk Image where sidewalk covered by sand is due to construction work ongoing 161 Waterway Blvd Timber Ln Forest Trail One side Both Ends 4.5 feet No Asphalt Ok (2) Damaged Grass Buffer Relatively smooth Sand/Dirt Covering Sidewalk See image of Palm Tree: this tree looks like its about to fall onto the sidewalk next hurricane 160 Waterway Blvd Forest Trail Driveway One side Both Ends 5.5 feet No Asphalt Ok (2) Damaged Grass Buffer Smooth surface Sand/Dirt Covering Sidewalk Path narrows at south end 97 Waterway Blvd Driveway Duck Lane One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Smooth surface Sand/Dirt Covering Sidewalk Middle portion could be graded a 1 for condition 159 Waterway Blvd Duck Ln Sparrow Dr One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Relatively smooth surface Sand/Dirt Covering Sidewalk Project Plan in place to raise Waterway Blvd MultiUse path between 41st and 38th 158 Waterway Blvd Sparrow Dr Intracoastal Ct One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Rumble strips Cracked or Raised Surface Project Plan in place to raise Waterway Blvd MultiUse path between 41st and 38th 96 Waterway Blvd Intercoastal Ct 41st Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Truncated Domes only at one end Sand/Dirt Covering Sidewalk Project Plan in place to raise Waterway Blvd MultiUse path between 41st and 38th 107 28th Ave Palm Blvd Cameron Blvd One side Both Ends 5 feet No Concrete Good (3) Damaged Grass Buffer Rumble strips; slight elevation; smooth surface 108 28th Ave Cameron Blvd Hartnett Blvd One side Both Ends 5 feet No Concrete Good (3) Grass Buffer Smooth surface; rumble strips; some elevation but gradual 109 28th Ave Hartnett Blvd IOP Recreation Center Both Sides Discontinues at One End 4.5 feet No Concrete Good (3) Parking Buffer Smooth surface; no rumble strips 110 28th Ave Hartnett Blvd IOP Recreation Center Both Sides Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Smooth surface; Truncated Domes only at one end 178 41st Ave Marginal Rd Wildwood Dr One Side Both Ends 4 feet No Asphalt Ok (2) None - Paved Shoulder Evident Drainage Grates 176 41st Ave Wildwood Dr Frank Sottile Ln One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes but very high incline Overgrown Landscaping 171 41st Ave Frank Sottile Lane Driveway One side Both Ends 5.5 feet No Asphalt Ok (2) Damaged Grass Buffer Truncated Domes at intersection; very steep incline - not ADA approved slope Cracked or Raised Surface 170 41st Ave Driveway Parking Lot One side Both Ends 5 feet No Asphalt Poor (1) Damaged Grass Buffer No rumble extremely uneven Sand/Dirt Covering Sidewalk Sidewalk almost completely gone, covered by sand and gravel 53 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 165 Waterway Blvd 31st Ave 32nd Ave One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Smooth- on the one end of segment closest to golf course, there are many cracks Overgrown Landscaping 164 Waterway Blvd 32nd Ave Shady Ln One side Both Ends 4.3 feet No Asphalt Ok (2) Grass Buffer No evidence- maybe for puddling Smooth but too much sand Sand/Dirt Covering Sidewalk 163 Waterway Blvd Shady Ln Oakview Ln One side Both Ends 4.8 feet No Asphalt Ok (2) Grass Buffer Smooth surface Sand/Dirt Covering Sidewalk Impediments mainly sand or dirt- could be a condition 3 162 Waterway Blvd Oakview Ln Timber Ln One side Both Ends 5.3 feet No Asphalt Poor (1) Damaged Grass Buffer Surface broken and uneven Sand/Dirt Covering Sidewalk Image where sidewalk covered by sand is due to construction work ongoing 161 Waterway Blvd Timber Ln Forest Trail One side Both Ends 4.5 feet No Asphalt Ok (2) Damaged Grass Buffer Relatively smooth Sand/Dirt Covering Sidewalk See image of Palm Tree: this tree looks like its about to fall onto the sidewalk next hurricane 160 Waterway Blvd Forest Trail Driveway One side Both Ends 5.5 feet No Asphalt Ok (2) Damaged Grass Buffer Smooth surface Sand/Dirt Covering Sidewalk Path narrows at south end 97 Waterway Blvd Driveway Duck Lane One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Smooth surface Sand/Dirt Covering Sidewalk Middle portion could be graded a 1 for condition 159 Waterway Blvd Duck Ln Sparrow Dr One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Relatively smooth surface Sand/Dirt Covering Sidewalk Project Plan in place to raise Waterway Blvd MultiUse path between 41st and 38th 158 Waterway Blvd Sparrow Dr Intracoastal Ct One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Rumble strips Cracked or Raised Surface Project Plan in place to raise Waterway Blvd MultiUse path between 41st and 38th 96 Waterway Blvd Intercoastal Ct 41st Ave One side Both Ends 5 feet No Asphalt Ok (2) Grass Buffer Truncated Domes only at one end Sand/Dirt Covering Sidewalk Project Plan in place to raise Waterway Blvd MultiUse path between 41st and 38th 107 28th Ave Palm Blvd Cameron Blvd One side Both Ends 5 feet No Concrete Good (3) Damaged Grass Buffer Rumble strips; slight elevation; smooth surface 108 28th Ave Cameron Blvd Hartnett Blvd One side Both Ends 5 feet No Concrete Good (3) Grass Buffer Smooth surface; rumble strips; some elevation but gradual 109 28th Ave Hartnett Blvd IOP Recreation Center Both Sides Discontinues at One End 4.5 feet No Concrete Good (3) Parking Buffer Smooth surface; no rumble strips 110 28th Ave Hartnett Blvd IOP Recreation Center Both Sides Both Ends 4.5 feet No Concrete Good (3) Parking Buffer Smooth surface; Truncated Domes only at one end 178 41st Ave Marginal Rd Wildwood Dr One Side Both Ends 4 feet No Asphalt Ok (2) None - Paved Shoulder Evident Drainage Grates 176 41st Ave Wildwood Dr Frank Sottile Ln One side Both Ends 5.3 feet No Asphalt Ok (2) Grass Buffer Truncated Domes but very high incline Overgrown Landscaping 171 41st Ave Frank Sottile Lane Driveway One side Both Ends 5.5 feet No Asphalt Ok (2) Damaged Grass Buffer Truncated Domes at intersection; very steep incline - not ADA approved slope Cracked or Raised Surface 170 41st Ave Driveway Parking Lot One side Both Ends 5 feet No Asphalt Poor (1) Damaged Grass Buffer No rumble extremely uneven Sand/Dirt Covering Sidewalk Sidewalk almost completely gone, covered by sand and gravel 08/17/26 2026 MOBILITY STUDY 54CITY OF ISLE OF PALMS APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 169 41st Ave Parking Lot Parking Lot One side Both Ends 5 feet No Asphalt Ok (2) Damaged Grass Buffer Sand/Dirt Covering Sidewalk 168 41st Ave Parking Lot Parking Lot One side Both Ends 6 feet No Asphalt Ok (2) Grass Buffer Sand/Dirt Covering Sidewalk 167 41st Ave Parking Lot Fire Station One side Discontinues at One End 4.8 feet No Concrete Ok (2) Damaged Grass Buffer Truncated Domes only at one end Sand/Dirt Covering Sidewalk 172 Marina 41st Ave Marina One side Discontinues at One End 4.9 feet Yes Concrete Ok (2) Parking Buffer Looks like a recently built sidewalk 55 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX A: SIDEWALK INVENTORY SUMMARY TABLE SEGMENT ID STREET NAME SEGMENT START SEGMENT END PLACEMENT NETWORK CONNECTION WIDTH ELEVATED MATERIAL CONDITION SEPARATION TYPE EVIDENCE OF FLOODING ADA INFRASTRUCTURE IMPEDIMENTS NOTES 169 41st Ave Parking Lot Parking Lot One side Both Ends 5 feet No Asphalt Ok (2) Damaged Grass Buffer Sand/Dirt Covering Sidewalk 168 41st Ave Parking Lot Parking Lot One side Both Ends 6 feet No Asphalt Ok (2) Grass Buffer Sand/Dirt Covering Sidewalk 167 41st Ave Parking Lot Fire Station One side Discontinues at One End 4.8 feet No Concrete Ok (2) Damaged Grass Buffer Truncated Domes only at one end Sand/Dirt Covering Sidewalk 172 Marina 41st Ave Marina One side Discontinues at One End 4.9 feet Yes Concrete Ok (2) Parking Buffer Looks like a recently built sidewalk 08/17/26 2026 MOBILITY STUDY 56CITY OF ISLE OF PALMS APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD ANALYSIS PUBLIC ENGAGEMENT CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78 BIKE FACILITIES A1 Restripe existing Bike Lane markings along Palm Blvd Breach Inlet IOP Connector X X 5 13 8 3 8 9 10 56 A2 Add Bike Facility along Ocean Blvd, Charleston Blvd and 14th Ave to follow B2B Route* Ocean Blvd Dead End IOP Connector X Follows the B2B route 5 4 11 0 8 7 0 35 A3 Add Bike Facility along JC Long Blvd Ocean Blvd Palm Blvd X 5 5 3 0 8 4 0 25 A4 Extend dedicated Bike Lane along Palm Blvd 10th Ave IOP Connector X 5 15 8 0 8 9 0 45 A5 Extend Bike Lane along both sides of IOP Connector to fully connect with Palm and front beach End of Bridge Palm Blvd X X Outbound connection is a critical gap (TOP Priority for the City) 5 10 11 0 8 9 10 53 A6 Add Bike Facility along Palm Blvd heading north IOP Connector 41st Ave X 5 15 11 0 8 4 10 53 A7 Add Bike Facility along 21st Ave Palm Blvd Waterway Blvd X X 5 5 7 0 8 4 0 29 A8 Add Bike Facility along Hartnett Blvd 22nd Ave 41st Ave X ROW concerns 5 4 1 0 8 4 0 22 A9 Add Bike Facility along Waterway Blvd 21st Ave 41st Ave X 8ft multi-use path under construction along Waterway 3 11 13 0 8 6 10 51 A10 Add Bike Facility along 41st Ave Palm Blvd Marina X 3 10 11 0 8 6 0 38 57 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD ANALYSIS PUBLIC ENGAGEMENT CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78 BIKE FACILITIES A1 Restripe existing Bike Lane markings along Palm Blvd Breach Inlet IOP Connector X X 5 13 8 3 8 9 10 56 A2 Add Bike Facility along Ocean Blvd, Charleston Blvd and 14th Ave to follow B2B Route* Ocean Blvd Dead End IOP Connector X Follows the B2B route 5 4 11 0 8 7 0 35 A3 Add Bike Facility along JC Long Blvd Ocean Blvd Palm Blvd X 5 5 3 0 8 4 0 25 A4 Extend dedicated Bike Lane along Palm Blvd 10th Ave IOP Connector X 5 15 8 0 8 9 0 45 A5 Extend Bike Lane along both sides of IOP Connector to fully connect with Palm and front beach End of Bridge Palm Blvd X X Outbound connection is a critical gap (TOP Priority for the City) 5 10 11 0 8 9 10 53 A6 Add Bike Facility along Palm Blvd heading north IOP Connector 41st Ave X 5 15 11 0 8 4 10 53 A7 Add Bike Facility along 21st Ave Palm Blvd Waterway Blvd X X 5 5 7 0 8 4 0 29 A8 Add Bike Facility along Hartnett Blvd 22nd Ave 41st Ave X ROW concerns 5 4 1 0 8 4 0 22 A9 Add Bike Facility along Waterway Blvd 21st Ave 41st Ave X 8ft multi-use path under construction along Waterway 3 11 13 0 8 6 10 51 A10 Add Bike Facility along 41st Ave Palm Blvd Marina X 3 10 11 0 8 6 0 38 08/17/26 2026 MOBILITY STUDY 58CITY OF ISLE OF PALMS APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD ANALYSIS PUBLIC ENGAGEMENT CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78 CROSSWALKS & INTERSECTIONS B1 Mark Crosswalks to Beach Access Points along Ocean Blvd Beach Access 1b Beach Access 9 X X 5 2 4 0 8 6 0 25 B2 Improve Markings and potentially add pedestrian Signage/Signals along Ocean Blvd in Front Beach 10th Ave 14th Ave X X 5 7 0 0 8 7 0 27 B3 New Crosswalk at JC Long Blvd and Palm Blvd Intersection Point at Intersection X X 5 11 6 0 8 4 0 34 B4 New Crosswalk near Public Safety Building along JC Long Blvd Point at Crosswalk X 5 2 1 0 8 4 0 20 B5 New Crosswalk near City Hall along Palm Blvd Point at Crosswalk X 5 11 2 0 8 4 0 30 B6 IOP Connector Crosswalk & Intersection overall Improvement Point at Intersection X X 5 15 6 0 8 9 10 53 B7 New Crossing with Signage/ Signals at Palm Blvd and 20th Avenue Point at Intersection X 5 13 2 0 8 4 10 42 B8 Improve Crosswalk Safety and Visibility at 21st Ave and Palm Blvd Intersection Point at Intersection X 5 13 2 0 8 4 10 42 B9 Improve Crosswalk Safety potentially with new signage/ signals along Palm Blvd at Beachside Ave Point at Intersection X 5 3 1 0 8 4 0 21 B10 Improve markings and potentially add pedestrian Signage/Signals at 25th Ave and Palm intersection Point at Intersection X 3 6 4 0 8 4 0 25 B11 New Crosswalk at Waterway Blvd and 28th Ave Point at Intersection X 5 0 4 0 8 6 0 23 B12 New Crosswalks at 29th Ave and both Palm Blvd and Waterway Blvd Intersections Point at Intersections X 5 2 4 0 8 6 0 25 B13 New Crosswalk with Signage/ Signals at 41st Ave Beach Access Point at Crosswalk X May be too close to curve for DOT to approve 5 1 1 0 8 4 0 19 B14 Intersection Improvement at Palm Blvd and 41st Ave Point at Intersection X Project underway 5 7 1 0 8 6 0 27 B15 Improve Crosswalk at Waterway Blvd and 41st Ave Point at Intersection X 5 7 1 0 8 6 0 27 B16 Improve Crosswalk Markings at Palm Blvd and 43rd Ave Intersection Point at Intersection X X Project is Complete 5 6 1 0 8 6 0 26 B17 Improve Crosswalks at Palm Blvd and Wild Dunes Entrance Gate (46th) Point at Intersection X Project is underway 5 6 1 0 8 6 0 26 N/A Consistent Crosswalk Markings on all Side Streets Various Locations (Not Mapped) X 5 3 6 0 8 3 0 25 59 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD ANALYSIS PUBLIC ENGAGEMENT CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78 CROSSWALKS & INTERSECTIONS B1 Mark Crosswalks to Beach Access Points along Ocean Blvd Beach Access 1b Beach Access 9 X X 5 2 4 0 8 6 0 25 B2 Improve Markings and potentially add pedestrian Signage/Signals along Ocean Blvd in Front Beach 10th Ave 14th Ave X X 5 7 0 0 8 7 0 27 B3 New Crosswalk at JC Long Blvd and Palm Blvd Intersection Point at Intersection X X 5 11 6 0 8 4 0 34 B4 New Crosswalk near Public Safety Building along JC Long Blvd Point at Crosswalk X 5 2 1 0 8 4 0 20 B5 New Crosswalk near City Hall along Palm Blvd Point at Crosswalk X 5 11 2 0 8 4 0 30 B6 IOP Connector Crosswalk & Intersection overall Improvement Point at Intersection X X 5 15 6 0 8 9 10 53 B7 New Crossing with Signage/ Signals at Palm Blvd and 20th Avenue Point at Intersection X 5 13 2 0 8 4 10 42 B8 Improve Crosswalk Safety and Visibility at 21st Ave and Palm Blvd Intersection Point at Intersection X 5 13 2 0 8 4 10 42 B9 Improve Crosswalk Safety potentially with new signage/ signals along Palm Blvd at Beachside Ave Point at Intersection X 5 3 1 0 8 4 0 21 B10 Improve markings and potentially add pedestrian Signage/Signals at 25th Ave and Palm intersection Point at Intersection X 3 6 4 0 8 4 0 25 B11 New Crosswalk at Waterway Blvd and 28th Ave Point at Intersection X 5 0 4 0 8 6 0 23 B12 New Crosswalks at 29th Ave and both Palm Blvd and Waterway Blvd Intersections Point at Intersections X 5 2 4 0 8 6 0 25 B13 New Crosswalk with Signage/ Signals at 41st Ave Beach Access Point at Crosswalk X May be too close to curve for DOT to approve 5 1 1 0 8 4 0 19 B14 Intersection Improvement at Palm Blvd and 41st Ave Point at Intersection X Project underway 5 7 1 0 8 6 0 27 B15 Improve Crosswalk at Waterway Blvd and 41st Ave Point at Intersection X 5 7 1 0 8 6 0 27 B16 Improve Crosswalk Markings at Palm Blvd and 43rd Ave Intersection Point at Intersection X X Project is Complete 5 6 1 0 8 6 0 26 B17 Improve Crosswalks at Palm Blvd and Wild Dunes Entrance Gate (46th) Point at Intersection X Project is underway 5 6 1 0 8 6 0 26 N/A Consistent Crosswalk Markings on all Side Streets Various Locations (Not Mapped) X 5 3 6 0 8 3 0 25 08/17/26 2026 MOBILITY STUDY 60CITY OF ISLE OF PALMS APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD ANALYSIS PUBLIC ENGAGEMENT CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78 SIDEWALK IMPROVEMENTS C1 Widen Sidewalk along Ocean Blvd & 14th Ave in Front Beach Commercial Area 10th Ave IOP Connector X X ROW constraints and fitting as much parking as practical 5 7 1 6 3 6 0 28 C2 Widen Sidewalk along 21st Street Palm Blvd Waterway Blvd X Sidewalk replaced/ extended to Palm at beach access in 2025 5 1 0 7 3 6 0 22 C3 Improve Sidewalk along all of Waterway Blvd 21st Ave 41st Ave X New 8ft multi-use path under construction along Waterway Blvd 3 13 6 12 3 6 0 43 C4 Widen Sidewalk along Palm Blvd 21st Ave 41st Ave X Working with DOT on project improvement and coordinating with TST; Long-range idea 5 15 6 7 3 6 10 52 C5 Improve shoulder with a sidewalk along 41st Ave Palm Blvd Marina X X 3 7 1 10 3 3 0 27 C6 Widen Sidewalk along Palm Blvd 41st Ave 57th Ave X 5 7 4 1 3 6 0 26 N/A Continuous Maintenance, Removal or Enforcement of Obstructions Islandwide (Not Mapped) X X 0 0 0 3 3 6 0 12 N/A Repair Cracked, Damaged, Eroded, or Uneven Sidewalk Segments Islandwide (Not Mapped) X X 0 0 0 3 3 6 0 12 NEW SIDEWALKS D1 Extend Sidewalk along Palm Blvd Carolina Blvd 10th Ave X X TST funding allocated/ engineering done to extend sidewalk; Phase 1 is from Carolina to 2nd Ave 5 13 7 0 3 9 0 37 D2 Extend Sidewalk along Ocean Blvd Beach Access 1b Beach Access 6 X 5 4 9 0 3 6 0 27 D3 Sidewalk Extension along JC Long Blvd to Ocean Blvd End of Sidewalk Ocean Blvd X Approved TST funding to extend sidewalk (at-grade sidewalk) 5 5 5 0 8 6 0 29 D4 New and Extend Sidewalk along IOP Connector End of Bridge Palm Blvd X X 5 15 9 0 3 6 10 48 D5 New Sidewalk/Multi-Use Path that connects Hartnett Blvd to 21st Ave 21st Ave 22nd Ave X Would need easement between two private properties/newer homes 5 0 0 0 5 4 0 14 D6 Connect Crosswalks to Existing Sidewalk Infrastructure along Palm Various Locations X 5 6 11 6 8 3 0 39 D7 New Sidewalk along 28th Ave from Waterway to back of Recreation Center Rec Center Waterway Blvd X X Recently finished 28th along Palm, sidewalk to Waterway would make sense 5 1 6 0 8 6 0 26 D8 New Sidewalk around the Recreation Center Block Various Segments X 5 1 1 0 3 3 0 13 D9 New Sidewalk along 34th Ave to connect Palm Blvd with Forest Trail Palm Blvd Forest Trail X Resident driven project 5 6 0 0 8 1 0 20 61 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD ANALYSIS PUBLIC ENGAGEMENT CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78 SIDEWALK IMPROVEMENTS C1 Widen Sidewalk along Ocean Blvd & 14th Ave in Front Beach Commercial Area 10th Ave IOP Connector X X ROW constraints and fitting as much parking as practical 5 7 1 6 3 6 0 28 C2 Widen Sidewalk along 21st Street Palm Blvd Waterway Blvd X Sidewalk replaced/ extended to Palm at beach access in 2025 5 1 0 7 3 6 0 22 C3 Improve Sidewalk along all of Waterway Blvd 21st Ave 41st Ave X New 8ft multi-use path under construction along Waterway Blvd 3 13 6 12 3 6 0 43 C4 Widen Sidewalk along Palm Blvd 21st Ave 41st Ave X Working with DOT on project improvement and coordinating with TST; Long-range idea 5 15 6 7 3 6 10 52 C5 Improve shoulder with a sidewalk along 41st Ave Palm Blvd Marina X X 3 7 1 10 3 3 0 27 C6 Widen Sidewalk along Palm Blvd 41st Ave 57th Ave X 5 7 4 1 3 6 0 26 N/A Continuous Maintenance, Removal or Enforcement of Obstructions Islandwide (Not Mapped) X X 0 0 0 3 3 6 0 12 N/A Repair Cracked, Damaged, Eroded, or Uneven Sidewalk Segments Islandwide (Not Mapped) X X 0 0 0 3 3 6 0 12 NEW SIDEWALKS D1 Extend Sidewalk along Palm Blvd Carolina Blvd 10th Ave X X TST funding allocated/ engineering done to extend sidewalk; Phase 1 is from Carolina to 2nd Ave 5 13 7 0 3 9 0 37 D2 Extend Sidewalk along Ocean Blvd Beach Access 1b Beach Access 6 X 5 4 9 0 3 6 0 27 D3 Sidewalk Extension along JC Long Blvd to Ocean Blvd End of Sidewalk Ocean Blvd X Approved TST funding to extend sidewalk (at-grade sidewalk) 5 5 5 0 8 6 0 29 D4 New and Extend Sidewalk along IOP Connector End of Bridge Palm Blvd X X 5 15 9 0 3 6 10 48 D5 New Sidewalk/Multi-Use Path that connects Hartnett Blvd to 21st Ave 21st Ave 22nd Ave X Would need easement between two private properties/newer homes 5 0 0 0 5 4 0 14 D6 Connect Crosswalks to Existing Sidewalk Infrastructure along Palm Various Locations X 5 6 11 6 8 3 0 39 D7 New Sidewalk along 28th Ave from Waterway to back of Recreation Center Rec Center Waterway Blvd X X Recently finished 28th along Palm, sidewalk to Waterway would make sense 5 1 6 0 8 6 0 26 D8 New Sidewalk around the Recreation Center Block Various Segments X 5 1 1 0 3 3 0 13 D9 New Sidewalk along 34th Ave to connect Palm Blvd with Forest Trail Palm Blvd Forest Trail X Resident driven project 5 6 0 0 8 1 0 20 08/17/26 2026 MOBILITY STUDY 62CITY OF ISLE OF PALMS APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD ANALYSIS PUBLIC ENGAGEMENT CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78 PLANNING E1 Conduct a Road Diet Study along Palm Boulevard between Breach Inlet and the Connector Breach Inlet IOP Connector X Not Scored E2 Evaluate feasibility of adding a bus pull off at pedestrian entrance to County Park Point at Location X Not Scored E3 Evaluate Feasibility of New Multi-Use Path in ROW connecting 13th Ave to 20th Ave (along Cassina Ave) 13th Ave 20th Ave X Along ditch behind Harris Teeter - Feasibility and alternative needs to be assessed Not Scored OTHER PROJECTS F1 Add Bike/Ped Amenities or Golf Cart Parking at Major Destination Points Various Locations X 5 2 3 0 8 1 0 19 F2 Add Street Lights along streets or at certain intersections and/ or crosswalks Various Locations X 5 1 3 0 8 1 0 18 F3 Pave Off-Road Path parallel to Palm Blvd sidewalk connecting to Bunch Park Cassina Ave 20th Ave X 5 5 0 3 3 0 0 16 F4 Pave Off-Road Path/goat path adjacent to parking along southside of Palm Blvd at 21st Ave curve 21st Ave curve 21st Ave X X 5 5 0 6 3 0 0 19 F5 Add Bike/Ped Amenities near Beach Access Points Various Locations X 5 1 3 0 8 1 0 18 F6 Ensure beach access at 25th Ave and 34A are ADA accessible/graded or mats Point at Locations 5 6 1 6 8 6 0 32 F7 Sidewalk Drainage Project along Palm Blvd 36th Ave 41st Ave X X Designed and permitted 5 6 0 4 3 6 0 24 63 2026 MOBILITY STUDY CITY OF ISLE OF PALMS 08/17/26 APPENDIX B: DETAILED RECOMMENDED PROJECT LIST & SCORING TYPE LABEL RECOMMENDED PROJECT ENDPOINT 1 ENDPOINT 2 FIELD ANALYSIS PUBLIC ENGAGEMENT CITY COMMENTS ACCESSIBILITY SAFETY CONNECTIVITY DESIGN/CONDITIONS FEASIBILITY OTHER PC PRIORITY TOTAL SCORE MAX SCORE: 5 MAX SCORE: 15 MAX SCORE: 16 MAX SCORE: 15 MAX SCORE: 8 MAX SCORE: 9 MAX SCORE: 10 MAX SCORE: 78 PLANNING E1 Conduct a Road Diet Study along Palm Boulevard between Breach Inlet and the Connector Breach Inlet IOP Connector X Not Scored E2 Evaluate feasibility of adding a bus pull off at pedestrian entrance to County Park Point at Location X Not Scored E3 Evaluate Feasibility of New Multi-Use Path in ROW connecting 13th Ave to 20th Ave (along Cassina Ave) 13th Ave 20th Ave X Along ditch behind Harris Teeter - Feasibility and alternative needs to be assessed Not Scored OTHER PROJECTS F1 Add Bike/Ped Amenities or Golf Cart Parking at Major Destination Points Various Locations X 5 2 3 0 8 1 0 19 F2 Add Street Lights along streets or at certain intersections and/ or crosswalks Various Locations X 5 1 3 0 8 1 0 18 F3 Pave Off-Road Path parallel to Palm Blvd sidewalk connecting to Bunch Park Cassina Ave 20th Ave X 5 5 0 3 3 0 0 16 F4 Pave Off-Road Path/goat path adjacent to parking along southside of Palm Blvd at 21st Ave curve 21st Ave curve 21st Ave X X 5 5 0 6 3 0 0 19 F5 Add Bike/Ped Amenities near Beach Access Points Various Locations X 5 1 3 0 8 1 0 18 F6 Ensure beach access at 25th Ave and 34A are ADA accessible/graded or mats Point at Locations 5 6 1 6 8 6 0 32 F7 Sidewalk Drainage Project along Palm Blvd 36th Ave 41st Ave X X Designed and permitted 5 6 0 4 3 6 0 24

Source: City of Isle of Palms website. First collected Nov 21, 2026.