Ways & Means Committee
5:45 p.m., Tuesday, February 15, 2011
The regular meeting of the Ways and Means Committee was held at 5:45 p.m., Tuesday,
February 15, 2011 in Council Chambers of City Hall, 1207 Palm Boulevard, Isle of Palms,
South Carolina. Attending the meeting were Councilmembers Bettelli, Buckhannon, Duffy,
Piening and Thomas, Mayor Cronin, City Administrator Tucker, City Treasurer Suggs,
Assistant to the Administrator Dziuban and City Clerk Copeland. The absences of
Councilmembers Bergwerf, Loftus and Stone were excused, and a quorum was present to
conduct business.
Mayor Cronin called the meeting to order and acknowledged that the press and public had
been duly notified of the meeting in accordance with the Freedom of Information Act.
Approval of Previous Meeting’s Minutes
MOTION: Councilmember Bettelli moved to approve the minutes of the regular
meeting of January 18, 2011 as submitted; Councilmember Duffy seconded and
the motion PASSED UNANIMOUSLY.
Councilmember Bettelli moved to re-order the agenda to allow for the presentation
of the Financial Statements prior to Citizens’ Comments; Councilmember Duffy
seconded and the motion PASSED UNANIMOUSLY.
4. Financial Statement – Treasurer Suggs
A. January Financial Statement
Through the month of January, the target is fifty-eight percent (58%); revenues are forty-four
percent (44%) collected to budgeted revenue in the General Fund, and expenditures in the
General Fund are at fifty-two percent (52%) of budget. Since the first of February, the City has
received two (2) property tax payments from Charleston County totaling one million three
hundred twenty thousand dollars ($1,320,000); adding that to the January 31 balance of one
million eight hundred ninety-four thousand dollars ($1,894,000) is a good indication that the City
will meet the budgeted revenue in Property Taxe s for FY11. All departments are under budget
with the exception of Mayor and Council that is skewed because annual compensation was paid
in November 2010. Cash in the bank of one million nine hundred eight thousand dollars
($1,908,000) at the end of January is twenty-three percent (23%) of annual General Fund ex-
penditures. Since the interest rate with the Local Government Investment Pool (LGIP) is slightly
higher than BB&T, additional funds were transferred into it today.
Mayor Cronin reminded the Treasurer that the City has received a semi-annual franchise fee
payment from Comcast in the amount of forty-one thousand four hundred three dollars
($41,403), which is higher than in FY10.
Treasurer Suggs reported that the City is investigating the possibility of contracting with an ar-
mored car service to count the large volume of coins and bills that are collected from the parking
meters on Front Beach. In the past, City staff has been responsible for counting the bills and
rolling the coins, which is a very labor-intensive task; the bank has requested that the City make
Ways & Means Committee
February 15, 2011
Page 2 of 12
a change because the delivery of this large amount of coins and bills puts a strain on the bank
branches’ staff as well.
Mayor Cronin commented that the City’s auditors have also expressed concern about the risk to
City employees who are responsible for the large amount of cash from the meters.
The Treasurer stated that she plans to have more information about the cost for this service to
present at the March meeting.
B. Tourism Schedules
State Accommodations Taxes – In February, the City received the December quarter’s payment
of one hundred nineteen thousand two hundred fifty dollars ($119,250); year-to-date, State
ATAX is trending up nine and a half percent (9.5) higher than in FY10.
Municipal Accommodations Fees – Municipal fees are running nineteen percent (19%) higher
than in FY10.
Charleston County Pass-Through – The City has not received a payment in FY11.
Mayor Cronin recalled that, two (2) years ago, the County reduced the payout of local govern-
ments by half; in FY11, tourism-related income is “up” throughout the County. The City has
requested that the re-distribution of funds return to its original level; the subject is on the
County’s agenda for later in the month, and Mayor Cronin has scheduled a meeting with the
City’s representative Dickie Schweers to ensure that he accurately presents the City’s position.
Hospitality Taxes – Although collections are down for February, collections year-to-date have
increased nine percent (9%) over FY10.
C. Projects Status
Beach Restoration – Expenditures in January were for permitting for the new project and post-
project monitoring of the original project.
53
rd-57th Avenue Drainage Project – The most recent expenditures were for advertising the RFP
in The Post and Courier.
Administrator Tucker reported that sixteen (16) prospective bidders had attended the mandatory
pre-bid conference on February 4
th; seven (7) companies submitted bids that were opened
earlier today. The bids ranged from seven hundred ninety-seven thousand dollars ($797,000) to
one million one hundred seventy four thousand dollars ($1,174,000); the civil engineers are
reviewing the bids and a recommendation is expected at the Council meeting of February 22.
City Hall Renovations – Two (2) construction payments were made in January; the remaining
balance for the project is one hundred ninety-two thousand seven hundred seventy-six dollars
($192,776).
Ways & Means Committee
February 15, 2011
Page 3 of 12
Councilmember Duffy asked when the renovations were to be completed; Administrator Tucker
responded that the Building Department has planned to move early in March.
The Administrator took a moment to introduced Doug Worster, who is a graduate student at the
College of Charleston in Public Administration; a requirement of the program is that he shadow
a working administrator, and he chose Administrator Tucker. Additionally, Mr. Worster works in
the Revenue Collections Department for Charleston County.
3. Citizens’ Comments
Presentation by CSE Regarding Results of Most Recent Monitoring and Status of Shoal
Management Project
Mayor Cronin introduced Dr. Tim Kana and Steven Traynum of Coastal Science and Engineer-
ing. Dr. Kana explained that the booklets at Councilmembers’ seats were the second edition of
the publication, Coastal Erosion and Solutions – A Primer, and twelve pages have been added.
The book has been designed to give property owners along the coast a clearer understanding of
what causes and what can be done about coastal erosion.
Mr. Traynum reviewed the PowerPoint presentation of the 2010 monitoring results for the IOP
Beach Restoration Project; a copy of the report is included with the historical record of the
meeting. The presentation focused on the March and September 2010 monitorings and the
changes that took place between the two (2), as well as the post-project conditions.
Mr. Traynum explained that the island has been divided into seven (7) monitoring “reaches” with
over one hundred twenty (120) monitoring stations and two hundred twenty (220) miles of
survey lines. Reaches 5, 6 and 7 represent the 2008 Restoration Project areas, and the
monitoring results for the reaches are as follows:
Area Monitored Change between 9/09 and 9/10
Reach 7, Dewees Inlet Unit volume has increased by 5.3 cy/ft
Reach 6, north end of IOP Unit volume has decreased by 19.7 cy/ft
Reach 5, 32
nd to 53rd Avenue Unit volume has decreased by 7.7 cy/ft
Reaches 1-4, Breach Inlet to Unit volume has increased by 9.6 cy/ft
5 2
nd Avenue
The results of the monitorings in the project area indicate that the overall project areas have
retained seventy-two percent (72%) of the volume gain and eighty-six percent (86%) of the
design volume. In summary, the studies indicate that, in the period between March and
September 2010, most areas north of 53
rd Avenue, the 2008 Project area, were stable or
accretional.
Mr. Traynum reported that the environmental doc uments for the focused-erosion project were
submitted last week and that the permitting agencies, DNR and the Corps of Engineers, have
received comments from the public and resource agencies. The agencies are compiling
comments and will see the City’s responses to the concerns noted.
Ways & Means Committee
February 15, 2011
Page 4 of 12
Mayor Cronin commented that the Ocean Course had trucked in sand last year and was
planning to do the same in 2011; the Mayor explained that this project belongs to the golf
course and is not related to the City’s project.
5. Old Business – None
6. New Business
A. Recommendation from the Real Property Committee to Award a Contract to
GEL Engineering in the amount of $50,865, not inclusive of sediment
testing or disposal fee, for the Engineering Design and Permitting for
Marina Dredging.
MOTION: Mayor Cronin moved to award a contract to GEL Engineering in the
amount of $50,865 for Engineering Design and Permitting for Marina Dredging;
Councilmember Thomas seconded.
Mayor Cronin stated that the City had received three (3) very comprehensive and detailed bids.
Vote: The motion PASSED UNANIMOUSLY.
B. Approval of $2,750 to replace the air conditioning in the Cardio Room.
MOTION: Mayor Cronin moved to approve $2,750 to replace the air condition-
ing in the Cardio Room; Councilmember Bettelli seconded.
Mayor Cronin said that the unit had been replaced; Administrator Tucker noted that the City had
received three (3) bids, and the other bids had been for thirty-five hundred dollars ($3,500) and
forty-two hundred fifty dollars ($4,250).
VOTE: The motion PASSED UNANIMOUSLY.
C. Review of FY 2011-2012 Capital Budgets and Long-Range Capital Plans
The Administrator explained that the Committees had reviewed the capital budget(s) for the City
departments under their purview and that the versions before the Committee at this meeting
have been refined based on changes at the Committee level or additional research done by the
department heads.
As requested, the mileage, purchase dates and recent maintenance information for vehicles are
attached as the last page of the Capital Budgets.
General Government
Court software upgrade 50,000
Administrator Tucker explained that the current software program is an old DOS-based program
with a single individual providing support.
Ways and Means Committee
February 15, 2011
Page 5 of 12
Replace Connector message board (possibly with computerized model) 15,000
Replace Breach Inlet message board (possibly with computerized model) 15,000
The Administrator suggested that these two (2) items be deferred to FY15 and refurbish the
existing boards in FY12. The Administrator still contends that comput erized message boards
would be advantageous to the City, but her research has not located a model that will
accommodate the volume of information that w ould be necessary. Administrator Tucker added
that Recreation employees had spent seventy- one (71) hours updating the message boards over
the past eleven (11) months. Mayor Cronin not ed that a large percentage of the community uses
the message boards as their information source.
Replace HVAC equipment (FY12 expense for Council Chambers) 12,000
The HVAC for Council Chambers is the oldest in the building, and the staff believes a place-
holder is warranted because the vendor ca nnot locate parts should the unit fail.
Replace staff computers (6 computers/4 yr. average life = approx. 1.5/year) 900
This item appears in every depa rtment for routine annual replacement. Staff is compiling the
comprehensive list of computers by department.
Administrator Tucker drew attention to FY13 and the 41 st Avenue roundabout, stating that she
would like for Council to continue thinking about this possibility, but defer it to FY16.
Special Projects
Underground of utility lines 75,000
The Administrator stated that the City had routi nely set aside this amount of money to use as a
match with the SCE&G Non-standard Service Clause funds for small projects.
Digitize historical records 7,500
Funds were authorized in the FY11 budget to begin the process of digitizing City records; thus
allocation is to continue that process.
Create City-wide intranet for employees and Council 10,000
Presently, not all City employees have City-ema il addresses; therefore, the only way to communi-
cate with all employees is through the bi-weekl y payroll. Assistant Dziuban explained that this
endeavor would provide a means to communicating to all employees and City Council about any
policy changes, general City-information, emerge ncy conditions and/or actions, etc. in a secure
environment; an intranet would also be a step toward the paperless initiative for the City.
Councilmember Buckhannon commented that GOOGLE has an application available that would
serve the same purpose, can accommodate up to five hundred (500) email addresses and is
free; Assistant Dziuban expressed concerns about security.
Implement on-street parking management program 30,000
Although a need has not been stated, the staff thinks it prudent to have some funds available for
a study, surveying, etc.
Facility Maintenance
Replace Council chairs 3,000
Councilmembers agreed that their chairs di d not need to be replaced and should be deferred.
Ways & Means Committee
February 15, 2011
Page 6 of 12
Elevator maintenance 2,700
Administrator Tucker stated that the costs of elevator maintenance was brought up at the Public
Safety Committee and that, as a result, the st aff is researching the st atus of warranties and
looking into putting out an RFP to possibly have all in the City under one (1) contract.
Improve parking lot (parking stops, driveway, sod, irrigation repairs) 15,000
Related to the City Hall lot that has experienc ed unusual wear and tear due to the construction
vehicles, the improvements would define the in gress/egress and dress-up the area around the
building.
Total General Government Capital Budget for FY12 $203,100
Councilmember Bettelli remarked that one budget he had seen referenced the privacy fence at
City Hall; he stated that the fence was in relatively good condition and suggested that the City
consider pressure washing it along with the exterior of City Hall.
Police Department
Replace patrol cars (3 in FY12 – these were purchase in FY06) 69,000
The Administrator reminded the Committee that t he specifics about the vehicles to be replaced is
on the back page. Routine rotation.
Replace VHS in-car camera systems with digital (4 in FY12) 13,600
This represents the City’s continuing e ffort to get away from the VHS cameras.
Replace mobile data terminals (patrol laptops) (2 per year) 4,500
Routine annual replacement.
Replace body armor (4 or 5 sets per year) 3,125
Routine annual replacement.
Replace staff computers (9 computers/4 yr. average life=approx. 2/year) 1,800
Replace computer servers (3 year replacement) w/backup system 6,500
Replace Animal Control 4 WD truck 24,000
Administrator Tucker commented that this item was deferred last year.
Councilmember Piening questioned why this vehicle had so many more miles than the patrol
cars purchased the same year; Chief Buckhannon replied that this vehicle is used seven (7)
days per week, unlike the patrol cars, and that this vehicle is the vehicle used for running
errands in addition to trips to the SPCA.
Councilmember Duffy noted that the patrol vehicles have ninety thousand to ninety-nine
thousand (90,000-99,000); he asked Chief Buckhannon how many of those miles were on-
island miles. The Chief said that he did not keep that kind of information, but that the bulk of the
miles were either on-island or back and forth to the jail in North Charleston. He added that the
vehicles average twenty to twenty-five thousand (20,000-25,000) miles per year.
Replace radar unit (approx. 2) 5,000
Ways & Means Committee
February 15, 2011
Page 7 of 12
Facility Maintenance
Pressure wash exterior (50% of PSB) 1,000
Elevator maintenance (1.5 of 2 elevators in PSB) 3,330
Generator maintenance (50% of PSB generator) 750
HVAC maintenance (50% of annual contract) 1,500
All of the above are routine annual expenditures.
Total Police Department Capital Budgets $134,105
Fire Department
Capital Leases:
’03 95ft ladder truck (10 yrs.) 82,113
75 ft ladder truck (cost $500k) (10 yrs.) 55,210
’09 E-1 pumper (10 yrs.) 4 0 , 3 8 3
Administrator Tucker pointed out that two (2) leases are paid off in FY13.
Regular Recurring:
Replace SCBA air packs and cylinders 27,020
Replace 10 sets of bunker gear 15,000
Replace fire hose and appliances 11,000
Councilmember Piening asked how long a set of bunker gear would last, and Chief Graham
stated that the shelf life is seven to ten (7-10) years. The Chief responded that the City owns
approximately forty-five (45) sets because they are sized to fit each member of the department.
As for the budget for ten (10) sets, Chief Graham said the determining factors for replacement
were wear-and-tear and turnover.
Replace Boston Whaler rescue boat (City has owned since 1989) 50,000
As a result of the Public Safety Committee m eeting, Chief Graham has been investigating other
vendors who can provide a like-boat at a reduc ed price to the Boston Whaler. Councilmember
Buckhannon questioned whether the purchase c ould be made through state purchasing. Chief
Graham has learned that Key West and Pioneer both manufacture a similar boat, and she has
gotten very favorable reports from DNR about t he Key West boat they purchased – the Key West
boat has a ten (10) year hull warranty.
3 mobile radio repeaters (this will allow 1 repeater per big truck) 36,000
These items are a re-budget from FY11. Coun cilmember Piening questioned the need for the
repeaters with the new radio tower on the island; Chief Graham said that the Fire Department
would need the repeaters for in-building coverage even with the tower upgrade.
8 mobile data terminals (computers in vehicles) needed for Consolidated Dispatch 18,000
Administrator Tucker explained that informatio n will be transmitted via data terminals once the
City joins the County’s Consolidated Dispatch sy stem; therefore, each truck will need a terminal.
The County is trying to get a grant for the lo cal governments making the transition, but the grant
funds are not a guarantee, so the money her e is a placeholder for that possibility.
Councilmember Bettelli asked when the City would be making the move to the Consolidated
Dispatch Center; Chief Buckhannon said that the move would be at the end of 2012 or early in
2013.
Ways & Means Committee
February 15, 2011
Page 8 of 12
Thermal Imaging Camera (have 3 – goal is to have 1 for each truck) 11,000
The Administrator stated that the thermal imaging camera detected fire behind a wall at the most
recent fire on Ocean Boulevard. In respons e to Councilmember Piening’s question about the life-
span of the cameras, Administrator Tucker sa id that it was six (6) years due to technology
changes. Chief Graham said that she is hopi ng to get ten (10) years out of the cameras.
Safety harness system (10 individual sets – goal to outfit entire staff) 5,500
Replace staff computers (7 computers/4 yr. average life=approx. 1.75/year) 1,800
Vent saw for cutting roofs (have 1 want 2 for both engines) 2,200
Councilmember Piening asked how often a vent saw was used; Chief Graham stated that the saw
must start when it is needed and that a backup sh ould be available when the first does not start.
Two 4-gas meters w/calibration (test for dangerous gases) 3,400
Administrator Tucker explained that this is a devi ce that tests for dangerous gases; the City does
not have one at this time.
Facility Maintenance
Generator Maintenance (50% of PSB generator) 750
Generator Maintenance – Station 2 1,100
Contribution to SIFD training facility maintenance 1,000
This contribution is being made for the us e the City gets from the SI facility.
Councilmember Piening asked whether Sullivan’s Island personnel ever came to assist IOP per-
sonnel; he noted that the monthly police reports did not indicate that to be the case. He queried
whether Sullivan’s Island was able to keep its personnel to a minimum because personnel at
IOP would back them up.
Elevator maintenance – Station 2 2,200
Elevator maintenance (50% of 1 elevator in PSB) 1,100
HVAC maintenance (50% of PSB annual contract) 2,500
HVAC maintenance – Station 2 2,000
Pressure wash exterior (Station 2 plus 50% of PSB) 1,800
Total Fire Department Capital Budget $371,076
Public Works Department
Capital Leases:
2006 Mack truck (PW2) 15,720
Caterpillar trash loader 15,560
2008 Mack w/30 yd. packer (PW22) 22,996
2009 Mack w/30 yd. packer (PW24) 22,624
Administrator Tucker pointed out that one (1) lease will drop off in FY13 and a second will drop
off in FY14.
Replace garbage shuttle 2002 Ford F150 4x4 (will reuse current hopper) 28,000
Ways & Means Committee
February 15, 2011
Page 9 of 12
Replace z-track mower for rights-of-way 13,500
Replace Island II Fleet Fuel Pump System & Software 30,000
Like the court software, this is a DOS-based program; Director Pitts has problems now when the
computer and the fuel island do not communicate. The Director is seeking prices from the current
vendor and from Jones & Frank.
Special Projects
Design, engineering and construction – 53rd to 57th Avenue Drainage Project 200,000
This assumes that the work is not co mpleted in FY11 and overlaps into FY12.
Design and engineering for 46th-52nd Avenue Drainage Project 86,000
This anticipates the initiation of the next phase.
Councilmember Bettelli sought confirmation from Mayor Cronin that the new project would need
full Council approval before any funds were expended; the Mayor agreed.
Replace dune walkover at public restroom 80,000
Replace dune walkover at 41st Avenue 80,000
Replace dune walkover at Sea Cabins & 1140 Ocean Condos 80,000
Administrator Tucker suggested that the City decide on an amount for routine dune walkover
replacement each year and allow a staff-level dete rmination to be made of the walkover in most
need of repair or replacement. Councilmember Betttelli asked whether the City would have to
meet Americans with Disabilitie s (ADA) requirements; the City Administrator responded that the
certain provisions, such as height, railings, guar ds along the edges, etc., would need to be met.
In the next version of the Capital Budget, only one (1) line will appear for dune walkover repair or
replacement.
Facility Maintenance
Garbage cart replacement (approximately100 cans/year) 6,600
Routine annual expenditure
Drainage contingency 25,000
Set aside of funds for smaller drainage problems that arise throughout the year.
Repeat drainage work based on 5 yr. maintenance schedule 76,800
Eadie’s contract
Contingency for right-of-way maintenance 3,000
This line is new to the budget and would be used to stabilize the rights- of-way around heavily
used beach accesses, for example, the addition of shell sand on the 21
st Avenue curve.
Total Public Works Capital Budget $626,800
Ways & Means Committee
February 15, 2011
Page 10 of 12
Building Department
Replace staff computers (4 computers/4 yr. average life=approximately 1/year) 900
Facility Maintenance
Generator maintenance (City Hall generator) 1,500
Preparation of old building to serve as a rental property 15,000
Staff recommends a placeholder for any repairs that might be necessary to ready the building for
rental. Administrator Tucker noted that Councilmember Buckhannon had suggested that this
expense might be more appropriately referenced in the City Hall renovation project budget using
the funds originally designated for the demolition of the Building Department.
Councilmember Buckhannon reminded the Committee that, on April 20, 2010, it had voted to
eliminate thirty-three thousand two hundred dollars ($33,200) from the FY11 Capital Budget; the
minutes of the meeting of May 18, 2010 indicate that the project budget was reduced by twenty-
eight thousand two hundred dollars ($28,200) with the elimination of the demotion of the
building and parking lot rehabilitation.
Total Building Department Capital Budget $17,400
Recreation Department
Administrator Tucker related that, after conferring with the Mount Pleasant Recreation Depart-
ment, Director Page has deferred the Rec Trac software upgrade for a card-swipe system to
FY13 to allow for further study. The Director has also removed the purchase of additional
portable stages.
Additional/replacement playground or scoreboard equipment 10,000
Annual expenditure for equipment or the scoreboard to be replaced as needed.
Replace staff computers (6 computers/4 yr. average life=approximately 1.5/yr.) 900
Replace/add water fountains (outside) (Youth baseball field in FY12) 6 ,000
PARD grant to offset recreation expenses (2,000)
Special Projects
Reserve funds to reconfigure baseball/softball fields and replace lights 150,000
Facility Maintenance
Topdress playground 5,000
Sand/clay mix for athletic fields 2,000
Replace metal doors on gymnasium 5,000
Like the City Hall exterior door s, these doors are badly rusted.
Total Recreation Department Capital Budget $176,900
Ways & Means Committee
February 15, 2011
Page 11 of 12
Front Beach Area, including Public Restrooms, Parking Meters and Parking Lots
Replace/refurbish benches, trash receptacles, information kiosks 2,000
Routine annual expenditure
Add 1 parking kiosk in high volume area at Sea Cabins (used model) 6,700
Facility Maintenance
Replace street signs, parking signs, poles (approximately 75 signs) 2,500
Maintain public restrooms, plumbing, electrical, etc. 7,500
Annual parking lot maintenance (fill material, grading) 1,000
Maintain irrigation system for parking lots and Front Beach green spaces 2,500
Maintain electrical systems, landscape lighting, etc. 2,000
Resurfacing (patching) City-owned portion of Ocean Boulevard 5,000
Sidewalks and brick repair on City-owned portion of Ocean Boulevard 5,000
Re-sod and refurbish green spaces 5,000
All of the above are routine annual expenditures.
Total Front Beach Capital Budget $ 39,200
Beach Restoration and Monitoring
2008 Project post-project monitoring (each January & July through July 2011) 65,331
2008 Project administration 5,000
2008 Project sand fencing maintenance 5,000
2008 Project escarpment grading (4 times/year) 1,800
Address focused erosion as it occurs (FY12 project is underway) 600,000
According to Administrator Tucker, the timing for th is is an unanswered question; as long as the
shoreline remains stable, the need does not exist.
Ongoing monitoring of shoreline/long-term beach management 50,000
Establish reserve for future beach restoration projects 100,000
Total Beach Restoration and Monitoring $827,131
Isle of Palms Marina
Design and permitting of new watersports/waverunner dock 25,000
This item is a re-budget from FY11; with dred ging on the horizon, this has been rolled to FY12.
Design and Permitting for new docks (permit process takes up to 1 yr.) 50,000
Ways & Means Committee
February 15, 2011
Page 12 of 12
Special Projects
Dredging (engineering, permitting in FY11, construction in FY12) 300,000
Administrator Tucker commented that the City does not know whether it will be the single partici-
pant in the project; therefore, having a place holder in the FY12 budget is necessary.
Total Marina Capital Budget $375,000
Mayor Cronin stated that the Morgan Creek Harbor Association (MCHA) knows where the City
is in the process; for financial reasons, the MCHA was hoping to wait another year. To join with
the City, the MCHA would have to assess their members to finance dredging.
Councilmember Buckhannon stated that he would like to see a proposal for the dock configu-
ration before any money is spent; he indicated that he wanted to see how many spaces would
be opened up by a reconfiguration to get an indication on what the return on investment would
be.
Mayor Cronin commented that Marina Manager Berrigan has been working on a master plan for
the marina, but he is not yet ready to present that plan to the full Council. Of key importance to
a plan will be who is responsible for what, and Manager Berrigan is in the process of calculating
how much of an investment he can make and when he can make it.
Referring to page 14 of the Capital Budgets, Administrator Tucker stated this page details the
City’s bonded debt service; she pointed out that the Beach Restoration project debt will be paid
in FY14.
The Administrator noted that in March, Committees will get their first look at the operating
budgets, and the changes discussed tonight will be reflected in the next version of the capital
budgets.
Councilmember Duffy asked for information on any debt that can be paid off early without a
penalty for the next meeting.
7. Miscellaneous Business
Mayor Cronin stated that Comcast has announced a rate increase effective April 1, 2011.
Next Meeting Date: 5:45 p.m., Tuesday, March 15, 2011.
8. Adjourn
MOTION: Councilmember Bettelli moved to adjourn the meeting at 7:43 p.m.;
Councilmember Duffy seconded and the motion PASSED UNANIMOUSLY.