PUBLIC WORKS COMMITTEE
4 p.m., Wednesday, January 6, 2010
The regular meeting of the Public Works Committee was held at 4 p.m., Wednesday, January 6,
2010 in the Public Works Building, 1303 Palm Boulevard, Isle of Palms, South Carolina.
Attending the meeting were Committee members Duffy, Stone and Thomas, City Administrator
Tucker, Public Works Director Pitts, Assistant to the Administrator Dziuban and City Clerk
Copeland. Special guests present were Westy Westmoreland of SCE&G and Dave Stevens of
Civil Site Engineering.
1. Brian Duffy, senior member of the Committee, called the meeting to order and
acknowledged that the press and public had been duly notified of the meeting in accordance
with the Freedom of Information Act.
2. Election of Chair and Vice-Chair
Councilmember Stone nominated Councilmember Du ffy to serve as Chair; Councilmember
Thomas seconded and there were no other nominations. Councilmember Duffy was
unanimously elected Chair of the Committee.
Councilman Stone nominated Councilmember Thomas to serve as Vice-Chair; Chair Duffy
seconded and there were no other nominations . Councilmember Thomas was unanimously
elected Vice-Chair of the Committee.
Chair Duffy asked for the Committee’s approval to suspend the rules move the first item of Old
Business to this place in the agenda; the Committee unanimously agreed.
6. Old Business
A. Discussion of Possible Options for SCE&G Electrical Service
Redistribution by Westy Westmoreland, SCE&G
Mr. Westmoreland stated that SCE&G was trying to accomplish several improvements on the
island, and he was present to explain them to the Committee. He explained that the substation
behind City Hall has three (3) circuits leaving it; one (1) services Sullivan’s Island and two (2) go
north. One (1) that goes north feeds everything up to 42
nd Avenue and the second is referred to
as an “express feeder” up to 42 nd Avenue and serves everything beyond 42 nd, including Wild
Dunes, Dewees, Capers and Bull islands. Due to the growth on the north end of the island, the
greatest majority of the electrical load of the three (3) circuits is on the Wild Dunes circuit;
SCE&G wants to add a fourth circuit to more evenly distribute the electrical load. The plan is to
take a portion of the load from the circuit serving up to 42
nd Avenue and to use that to serve
some of the area around Front Beach and City Hall. If that were to be accomplished, capacity
would be freed up to supplement should service be interrupted on the circuit going to the north
end of the island. The job at-hand is to run the new feeder line from the substation to the line
behind the Red & White Shopping Center, which is where the City becomes involved - the ideal
route for the new line is underground from the substation across the City’s property now
occupied by the Building Department. Administrator Tucker commented that, since the long-
range future for that parcel is undefined, she was of the opinion that SCE&G should run the
Public Works Committee
January 6, 2010
Page 2 of 5
line along the rear property lines of the City’s property so as to minimize the impact the future
development of the land.
In response to Councilmember Stone’s question, Mr. Westmoreland said SCE&G would need
an easement from the City of ten to twelve feet (10-12’) to ensure accessibility for servicing the
line. The proposed work will not make any visible change to the lines or poles and the entire
cost of the project would be borne by SCE&G.
Administrator Tucker cautioned the Committee that the City should not make any decisions
without involving the two (2) property owners behind City Hall and the Public Works
Department, the Duncans and Glaves.
Mr. Westmoreland indicated that SCE&G has the funds for the project budgeted and could
begin as soon as a decision is reached by the City about the approved route for the feeder line.
Mr. Westmoreland stated that there are plans to convert the substation behind City Hall to a
regulator station in that SCE&G is using its resources to best serve the island in worst case
situations, i.e. improving the reliability of service to the island.
A second project being discussed is eliminating the overhead lines in front of City Hall; the City
could use its Non-standard Service Funds to finance its portion of the costs. The City currently
has approximately two hundred twenty-five thousand dollars ($225,000) in its Non-standard
Service Fund; Mayor Cronin noted that the use of Non-standard Service Funds requires
matching funds from the City. Mr. Westmoreland noted that there would be efficiency and
economy in coordinating the two (2) projects.
Mr. Westmoreland asked if the City had made any progress in getting the three (3) property
owners between 8
th and 10th Avenues to grant the easements for undergrounding lines. Mayor
Cronin stated that the City had sent them letters urging them to sign over the easements and
was now at the point of scheduling a meeting between the residents, representatives of SCE&G
and the City to explain the benefits of their acquiescing to SCE&G’s request.
Lastly, Mr. Westmoreland informed the Committee that Phase 1 of undergrounding of lines in
Forest Trail has been completed, and SCE&G is beginning Phase 2, with plans to complete the
job by the end of the year.
The Committee thanked Mr. Westmoreland for attending the meeting and explaining SCE&G’s
plans for the Isle of Palms.
B. Update on 54
th-57th Avenue Drainage Project from Dave Stevens of Civil
Site Engineering
Administrator Tucker explained that the 53 rd-57th Avenue Drainage Project has been “in the
works” for a long time because the area has basically no drainage infrastructure at all, and the
area included, as well as 46 th and 51st Avenues that are not included in the project, experience
serious flooding when high tides and heavy rains coincide. There area instances when people
and public safety vehicles cannot get to their homes. In the early 2000s, City Council decided
Public Works Committee
January 6, 2010
Page 3 of 5
to begin setting aside money to someday put in frastructure into this area; a cooperative
agreement was entered into with Wild Dunes because the fastest way to eliminate the water is
to go through their property. In the last year, Council decided to move forward with the funding
the engineering design and permitting segments for the area between 54
th and 57 th Avenues.
There is a possibility that, between the money that City Council has set aside and grants
received from Charleston County, the City can move forward with a bid package for the project.
Mr. Stevens explained that the plan is to run drainage parallel to the existing road to the back
gate of Wild Dunes, cut across the parking lot going down Racket Club Road, through the bike
path to the outfall at the lake at the back. According to Mr. Stevens, the only entity who has not
yet given final approval is DOT who has issues with the fact that there is not enough fall with the
pipes; Mr. Stevens is presently going through a meeting process with DOT to show that they
can do pre-imposed. He stated that he does not anticipate any problems, but that there may
have to be some minor grade adjustments. The project has received approvals from OCRM,
Coastal Zone Consistency, Charleston County, and Charleston County stormwater.
Mr. Stevens noted that, if the City chose to do so, the project could be phased, but there would
be a loss of economy in mobilization if it were phased. The first phase would be following beach
accesses between 56
th and 57 th Avenues where the worst flooding occurs. Administrator
Tucker commented that the additional phases could be bid as alternates and, depending on
how the bids came in, alternates could be added back in until the available funds were used.
The Administrator noted that the City has already acquired the easement from Wild Dunes for
this portion.
Mr. Stevens stated that Wild Dunes would require that the outfall be constructed first before
proceeding with the beach access phase. Administrator Tucker commented that the City has
already spent one hundred fifty-four thousand dollars ($154,000) to pay for a parallel pipe that
runs along Racquet Club that is large enough to accommodate the water at such time as the
City connected.
Mr. Stevens assured the Committee that he would keep them abreast of progress with DOT.
On the subject of flooding, Administrator Tucker reported that 48
th Avenue is subject to flooding
in heavy rains, and it is a private road. During the last flooding event, public safety vehicles
could not get to the occupied homes on the stree t, and Public Works trucks could not get to the
homes to remove the garbage; therefore, the Administrator authorized Public Works to pump
48
th Avenue. With Committee approval, the Administrator intends to write to the 48 th Avenue
property owners expressing the need for them either to find a method of draining the stormwater
from the street or convey the road to the City.
On the subject of the 54
th-57th Avenue Drainage Project, Administrator Tucker informed the
Committee that no funds are set aside in the FY10 budget to proceed with construction;
however, if it is the will of the Committee, because the bid climate is so good, to recommend to
Ways and Means to go forward with the bid process to determine if the City can go forward with
any part of the project, funds are available. Assistant Dziuban noted that the language in the
bid packet states that the City is not required to award a contract becau
Public Works Committee
January 6, 2010
Page 4 of 5
Mr. Stevens stated that the project would take three (3) months to get the project setup and
staked out in responding to Councilmember Stone’s question. He added that he expected Wild
Dunes to require the work to be done in the winter; Chair Duffy stated that the expense could be
addressed in the coming budget cycle.
At this point, both the Administrator and City Clerk were excused from the meeting to go to the
Recreation Committee meeting at the Recreation Center.
3. Approval of Previous Meeting’s Minutes
MOTION: Chair Duffy moved to approve the minutes of the regular meeting of
November 4, 2009 as submitted; Councilmember Stone seconded and the motion
PASSED UNANIMOUSLY.
4. Citizens’ Comments - None
5. Department Report for November and December 2009 – Director Pitts
Director Pitts stated that for November and December, sanitation was down as demonstrated on
the 5-year comparison schedule; the City was at a five (5) year low for both months. Yard
debris was higher than normal in November. The primary concern for the two (2) months was
pumping stormwater; the Director stated, with the new pumps, Public Works personnel had
been able to deploy quickly with the first storm. The pumps were placed at 46
th, 49th, 51st and
53rd Avenues, and the City rented two (2) additional pumps for 50 th and 56-57 th Avenues.
Vehicle maintenance remains under budget.
Councilmember Stone asked to what Director Pitts attributed the rise in yard debris; the Director
thought it was probably due to nice weather for people to be trimming back their shrubbery.
6. Old Business
C. Update on Isle of Palms Solid Waste Disposal Destination
Director Pitts explained that the City is taking all of its garbage to Carolina Waste, a new
transfer station that is just off Azalea Drive in North Charleston. He indicated that the new
situation is working very well because the trips take less time than they were taking to the
incinerator. There is no additional cost to the City because the mileage is comparable to that of
the Bees Ferry Landfill, and productivity is up because personnel are not off the island as long.
7. New Business
A. Report on Anticipated Pre-Construction Meeting on CTC Resurfacing Plan
Chair Duffy decided to roll this forward to the next meeting.
Public Works Committee
January 6, 2010
Page 5 of 5
B. Discussion of Possible Amendment to Ordinance Regarding Leaves and
Grass Clippings
Chair Duffy stated that the City is anticipating that Charleston County is not going to accept this
type of debris in plastic bags as the County plans to improve its current composting. According
to Director Pitts, there are currently three (3) options “on the table.”
Councilmember Stone expressed an opinion he has held for awhile that the City should invest in
a grinder for yard debris to put into the City’s parking lots to compost. Director Pitts noted that
all of the yard debris goes to 4B where it is recycled.
This item will also be carried over to the February meeting.
C. Consideration of Award of Contracts in Excess of $10,000 – None
8. Miscellaneous Business
Chair Duffy reported that the street sign is down at 26
th Avenue and Waterway Boulevard.
Director Pitts reported that he had received some fifteen (15) signs before Christmas, but the
staff was diverted from installing them to pump stormwater. The installation work has resumed.
Director Pitts related that he remains unable to get the forty-gallon (40 gal) recycle bin to be
placed at the Front Beach restrooms on a trial basis.
The Director commented that he had spoken with Charleston County about a date for the spring
household hazardous materials collection; the only dates that are unavailable are March 13 and
April 17. The Committee decided to select a date at the next meeting.
Next meeting Date: 4:00 p.m., Wednesday, February 3, 2010
9. Adjourn
MOTION: Councilmember Stone moved to adjourn the meeting at 5:23 p.m.;
Councilmember Thomas seconded and the motion PASSED UNANIMOUSLY.
Respectfully submitted;
Marie Copeland
City Clerk
Source: City of Isle of Palms website. First collected Nov 21, 2026.