Backup Material
Oconee County · Oconee County · meeting of Aug 19, 2024 · Other
Open the original document More from Oconee County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
COMMISSION MEMBERS
Mike Johnson, Chairman, At-Large David Nix, Vice Chair, District 2
Teresa Spicer, District 1 Brit Adams, District 3
Joshua Owens, District 4 Gary Gaulin, District 5
Mickey Haney, At-Large
AGENDA
6:00 pm, Monday, August 19, 2024
Council Chambers - Oconee County 415 S Pine St, Walhalla SC 29691
1. Call to Order
2. Invocation
3. Pledge of Allegiance
4. Approval of minutes from July 15, 2024
5. Public Comment for Non-Agenda Items (4 minutes per person)
6. Commission Member Comments
7. Staff Comments
8. Discussion regarding lot setbacks, with particular reference to flag lots and irregularly shaped lots
a. Public comment
b. Discussion/ vote
9. Keep Oconee Beautiful- Scenic Highway Proposal, HWY 130.
a. Public Comment
b. Discussion/ vote
10. Adjourn
1
COMMISSION MEMBERS
Mike Johnson, Chairman, At-Large David Nix, Vice Chair, District 2
Teresa Spicer, District 1 Brit Adams, District 3
Joshua Owens, District 4 Gary Gaulin, District 5
Mickey Haney, At-Large
STAFF
James Coley
Elise Dunaway
MEDIA
Fox Carolina
MINUTES
6:00 pm, Monday, July 15, 2024
Council Chambers - Oconee County 415 S. Pine St, Walhalla SC 29691
1. Call to Order – Mr. Johnson called the meeting to order at 6:01 PM.
2. Invocation was led by Mr. Nix.
3. Pledge of Allegiance was led by Mr. Owens.
4. Approval of minutes from June 17, 2024 – Mr. Gaulin made a motion to approve the
minutes; Seconded by Mr. Johnson. Approved unanimously.
5. Public Comment for Non-Agenda Items (4 minutes per person):
Mr. Perry Smith thanked the Planning Commission for protecting property rights in
Oconee County.
6. Commission Member Comments
N/A
7. Staff Comments
Mr. Coley presented the proposed Ags Rd Subdivision to the members.
8. Discussion and potential recommendation to County Council regarding Ordinance 2023-
22, AN ORDINANCE AMENDING CHAPTER 32 OF THE OCONEE COUNTY CODE OF
ORDINANCES, IN CERTAIN LIMITED REGARDS AND PARTICULARS ONLY, REGARDING THE
ESTABLISHMENT OF DEVELOPMENT STANDARDS IN RELATION TO LIGHTING, BUFFERING,
AND OPEN SPACE RETENTION FOR NEW RESIDENTIAL SUBDIVISION DEVELOPMENTS OF
TWENTY-FIVE (25) ACRES OR MORE; AND OTHER MATTERS RELATED THERETO.
a. Public Comment
Mr. Tom Markovich expressed his concerns regarding the impacts the ordinance
2
will have on affordable housing and private property rights.
b. Discussion/ vote
Mr. Nix made a motion to eliminate the ordinance. Seconded by Mr. Haney.
Motion approved 5/2. Mr. Gaulin and Ms. Spicer opposed.
During discussion Mr. Haney made an a motion to amend the motion, to send the
proposed ordinance back to council with the purpose to create a light ordinance
similar to the noise ordinance and then bring it back to the Planning Commission.
Motion failed due to lack of a second
9. Discussion regarding options for setback enforcement when a parcel does not meet the
minimum lot width at the right-of-way/ front property line
a. Public Comment: N/A
b. Discussion/ vote
Mr. Haney made a motion to have Mr. Root draft an ordinance defining what a
flag lot is and include verbiage that will allow for odd shaped lot not to have the
same requirements as flag lots. Seconded by Mr. Johnson. Approved
unanimously.
Mr. Nix made a motion to allow Mr. Tom Markovich to speak. Seconded by Mr.
Haney. Motion approved 6/1. Ms. Spicer opposed.
Mr. Markovich expressed his concerns regarding current lot sizes.
10. Adjourn – The meeting was unanimously adjourned at 7:19 PM
3
4
5
STATE OF SOUTH CAROLINA
COUNTY OF OCONEE
ORDINANCE 2024-___
AN ORDINANCE AMENDING PORTIONS OF CHAPTERS
32 AND 38 OF THE OCONEE COUNTY CODE OF
ORDINANCES, IN LIMITED REGARDS AND
PARTICULARS ONLY, IN ORDER TO REVISE CERTAIN
SETBACK-RELATED PROVISIONS, INCLUDING
DEFINITIONS AND THE APPL ICATION THEREOF; AND
OTHER MATTERS RELATED THERETO.
WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9-
25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political
subdivision of the State of South Carolina, acting by and through its governing body, the Oconee
County Council (“County Council”), has the aut hority to enact regula tions, resolutions, and
ordinances, not inconsistent wi th the Constitution and the general law of the State of South
Carolina, including the exercise of such powers in relation to health and order within its boundaries
and respecting any subject as appears to it necess ary and proper for the security, general welfare,
and convenience of the County or for preserving health, peace, order, and good government
therein;
WHEREAS, the County has adopted multiple ordi nances for the eff ective, efficient
governance of the County, which, subsequent to adoption, are codified in the Oconee County Code
of Ordinances (“Code of Ordinances”), as amended;
WHEREAS, the County is authorized by Section 4-9-30(9) and Chapter 29 of Title 6 of
the South Carolina Code of Laws, among other sources, to im pose land use stan dards in the
unincorporated areas of the County;
WHEREAS, County Council recognizes that there is a need to revise the law of the County
to meet the changing needs of the County and that there is a need to amend, specifically, Chapters
32 and 38 of the Code of Ordinances in order to revise certain setback-related provisions, including
definitions and the application thereof; and
WHEREAS, County Council has therefor e determined to modify Chapters 32 and 38 of
the Code of Ordinances and to affirm and preserve all other provisions of the Code of Ordinances
not specifically, or by implication, amended hereby.
NOW THEREFORE, it is hereby ordained by the Oconee County Council, in meeting
duly assembled, that:
1. Certain provisions related to lot setbacks, as contained in Chapters 32 and 38 of the
Code of Ordinances, are hereby revised, rewritten, and amended to read as set forth in Exhibit A,
which is attached hereto incorporated herein by reference. Attached hereto as Exhibit B is a version
6
of Exhibit A which reflects the changes to the prior provisions; Exhibit B is for illustrative purposes
only and shall not be codified.
2. County Council hereby approves and adopts Exhibit A and directs that it be codified
in the Oconee County Code of Ordinances.
3. Should any part or provision of this Ordinance be deemed unconstitutional or
unenforceable by any court of co mpetent jurisdiction, such deter mination shall not affect the
remainder of this Ordinance, all of which is hereby deemed separable.
4. All ordinances, orders, resolutions, and actions of County Council inconsistent
herewith are, to the extent of such inconsistency only, here by repealed, revoked, and rescinded.
Nothing contained herein, however, or in the att achment hereto, shall cancel, void, or revoke, or
shall be interpreted as cancelling, voiding, or revoking, ex post facto, in any regard any prior land
use provision, or decision of th e County or County Council based thereon, which were valid and
legal at the time in effect and undertaken pursuant thereto, in any regard.
5. All other terms, provisions, and parts of the Code of Ordinances, and specifically,
but without exception, the remainder of Chapters 32 and 38, not amended hereby, directly or by
implication, shall remain in full force.
6. This Ordinance shall take effect and be in full force from and after third reading
and enactment by County Council.
ORDAINED in meeting, duly assembled, this ______ day of _________________, 2024.
ATTEST:
______________________________ _______________________________
Jennifer C. Adams Matthew Durham
Clerk to Oconee County Council Chair, Oconee County Council
First Reading:
Public Hearing:
Second Reading:
Public Hearing:
Third Reading:
7
Exhibit A
8
EXHIBIT B
Chapter 32:
Sec. 32-212. Definitions.
When used in this article, the following words and terms shall have th e meaning indicated.
Words and terms not herein define d shall have their customary di ctionary definitions. The term
"shall" is mandatory. When not in consistent with the content, words used in the singular number
include the plural and those used in the plural number include the singular.
. . .
Building line [Building setback line] means a line beyond which no part of the structure of any
building shall project unless specially permitted in this Code of Ordinances, and with the exception
of subsurface projection of foot ings, measured perpendicular to the property line. This includes,
but is not limited to, the building, eaves, porches, decks, chimneys, bay windows, and fire escapes.
. . .
Flag lot means a lot shaped like a flag on a pole. The “flag” shaped area is situated behind another
lot and is the portion of a flag lot where structures may be located. The “pole” shaped area is the
portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See
Chapter 38 for specific provisions addressing flag lots.)
. . .
Lot means a single parcel or tract of contiguous land intended as a unit for transfer of ownership,
or for building development, or both.
(1) Corner lot means a lot with frontage on at least two intersecti ng roads located at the point of
intersection.
(2) Lot depth means the mean horizontal distance between the front and rear lot lines.
(3) Double frontage lot means a parcel having frontage on two or more roads which is not located
at any intersection of such roads.
(4) Lot width means the straight-line distance between the points where the building line intersects
the two side lot lines. the horizontal distance between the side lot lines at the building setback line
measured parallel with the front lot line or in th e case of a curvilinear road measured parallel to
the chord of the arc between the intersection of the side lot lines and the road right-of-way line.
. . .
Setback means the required minimum distance between every structure and the lot lines of the lot
on which it is located (measured from the road right-of-way at the front of the lot if the road right-
of-way projects over th e property line, and measured from the property lines on the remaining
portions of the property).
9
. . .
Setback line means the line indicating the minimum distance permitted between the property line
or road right-of-way line, as applicable, and the building line.
. . .
Yard means a n open space that lies between the on the same lot with a principal building or
buildings and the nearest lot line or road right-of-way, as applicable. The minimum required yard
shall be unoccupied and unobstructed from the ground upward, except as may be expressly
permittedopen, unoccupied, and unobstructed by buildings or structures from ground to sky except
where encroachments and accessory buildings and structures are expressly permitted.
(1) Front yard means a yard situated between the front building line and the front lot line extending
the full width of the lot.
(2) Rear yard means a yard situated between the rear building line and the rear lot line extending
the full width of the lot.
(3) Side yard means a yard between the side building line and a side lot line that extends from the
front yard to the rear yard.
[Chapter 38 revisions on the following page]
10
Chapter 38:
Sec. 38-9.3. Dimensional requirements: General provisions and exceptions.
In addition to the dimensional requirements liste d below and district d imensional requirements,
further dimensional requirements may be set forth in Article 5 for those uses listed as conditional.
The control free district shall be exempt from the provisions of this section. The control free district
shall be exempt from the provisions of this s ection except provisions listed under item (2),
setbacks.
(1) Lot size and configuration.
a. Public utilities and government. Public utilities and government uses shall not be subject
to the minimum lot size requirements, but shall meet the setback requirements.
b. Flag lots . A flag lot shall contai n no more than two singl e-family dwellings and
uninhabited accessory structures. Flag lots may be permitted under the following conditions:
1. The minimum length of the “pole” of a flag lot shall be ____ feet, and the maximum
flagpole length the pole of a flag lot shall be 300 feet.
2. The minimum flagpole width of the pole of a flag lot shall be 30 feet and the
maximum width of the pole of a flag lot shall be ________ feet.
3. The front setback shall be measured from where the flag portion of the flag lot
meets the district minimum width requirements.
4. The flagpole portion of athe flag lot shall not be used to calculate area, width, or
setbacks of the lot or to provide off-street parking.
5. There shall be no more than one flag lot per each four lots, per subdivision or
development.
Flag lot Illustration:
11
(2) Setbacks.
a. The required front, side, and rear yards for in dividual lots shall be measured inward toward
the center of said lot from all points along the respective front, side, and rear property lines of the
lot, or from the road right-of-way if applicable . Once the yard areas of a given lot have been
established, the remaining area of the lot which is not included in any required front, side, or rear
lot shall be known as the "buildable" area within which the approved structure(s) shall be placed.
[DISCUSS]
b. Where a property abuts a road street right-of-way projects over a properly line, the setback
shall be measured from the road right-of-way line.
c. Corner lots shall be considered to have tw o fronts and shall meet the front setback for the
district.
d. Front yard setbacks for double frontage lots shall be provided for both streets upon which
the lot has frontage, and any accessory use(s) shall be prohibited from the required front yard
setback of the street upon which the principal building fronts.
e. For lots not meeting the required minimum lo t width for the respective district at the front
property line or road right-of-wa y, as applicable, the setback shall be measured such that the
distance from the front property line or road ri ght-of-way, as applicable , shall nonetheless be
included in the measurement for the required setback. The buildable area shall not, however,
include any area where the minimum lot width is not met.
Or
e. For lots not meeting the required minimum lo t width for the respective district at the front
property line or road right-of-wa y, as applicable, the setback shall be measured such that the
distance from the front property line or road right-of-way, as applicable, shall be included in the
measurement for the required setback. When both the respective district setback and minimum lot
width are met, however, an additional front setback shall be required of _____ shall be required.
12
fe. Road design and encroachment criteria is governed by the standards in Chapter 26, of the
Oconee County Code of Ordinances, as amended.
gf. Any garage door shall be set back a minim um of 20 feet from the property line that it
faces so that vehicles may be parked in the driveway without encroaching into the right-of-way.
If the district setback is greater than 20 feet, then the more restrictive setback shall prevail.
hg. The side and rear setbacks in the CCD a nd HCD shall not apply to the shared property
line of attached buildings.
ih. The space in any required yard shall be open and unobstructed except for the ordinary
projections of window sills, cornices, eaves, window air conditioning units, and other
architectural features, provided that such features shall project no more than two feet into any
required yard.
ki. Steps and heating and cooling units may project into a required yard a distance not to
exceed five feet but no closer than five feet of a property line. Fences, freestanding walls,
hedges, and septic lines may be located in any setback, so long as they remain on the property.
Sec. 38-12.2. Definitions.
Building setbacks: The minimum distance from the property line or road right-of-way line, as
applicable, to the closest projection of the exterior face of buildings, walls, or other form of
construction (i.e. decks, landings, terraces, porches, and patios on grade).
Building line / Building setback line means a line beyond which no part of the structure of any
building shall project unless specially permitted in this Code of Ordinances and with the exception
of subsurface projection of foot ings, measured perpendicular to the property line. This includes,
but is not limited to, the building, eaves, porches, decks, chimneys, bay windows, and fire escapes.
Building setback line: The line on the front, rear, and sides of a lot, set according to the district
regulations, which delineates the areas upon which a structure may be built or maintained. At the
time of application, all yard setbacks are dete rmined from the most re cent Oconee County Tax
Map.
Front yard setback—Shall be me asured from the front property line or, if the roadway
right-of-way projects over the front property line, then from the road right-of-way, all as
shown on tax maps.
Side and rear yard setbacks —Shall be measured from the property lines as shown on
tax maps.
Corner lot setbacks—Shall be measured from each front property line or if a the roadway
right-of-ways projects over the front property li ne(s), then from the road right-of-
way(s)it is adjacent to.
13
On a flag lot the "building setback line" runs parallel to the street and is measured from
the point in the “flag” main portion of the lot where the required minimum lot size is
met and (i.e. the "flag" part of the lot, not the "pole" part), which is closest to the street.
(The minimum lot width must be met in this area, as well. Therefore, if the point closest
to the street is a corner rather than a line, the setback will have to extend as far as
necessary to meet the required minimum lot width!)
. . .
Flag lot: A lot shaped like a flag on a pole. The “flag” shaped area is situated behind another lot
and is the portion of a flag lot where structures may be located. The “pol e” shaped area is the
portion of the lot by which vehicular access to the flag area from its adjoining road is located. (See
Chapter 38 for specific provisions addressing flag lots.)
. . .
Lot, width: The straight linestraight-line distance between the point s where the building setback
line intersects the two side lot lines.
. . .
Setback: The required minimum distance between every structure and the lot lines of the lot on
which it is located (measured from the road right-of-way at the front of the lot if the road right-of-
way projects over the property lin e, and measured from the property lines on the remaining
portions of the property).
The required minimum distance between every structure and the lot lines of the lot on which it is
located (measured from the road right-of-way in the front and property lines on the remaining
portions of the property).
. . .
Yard:
Yard: An open space that lies between the principal building or buildings and the nearest lot
line. The minimum required yard as set forth in this chapter is unoccupied and unobstructed from
the ground upward, except as may be expressly permitted.
Yard, front (highway yard): A yard across the full width of the lot extending from the front
line of the building.
Yard, rear: A yard extending across the full wi dth of the lot and meas ured between the rear
line of the lot and the rear line of the main building.
Yard, side: An open space on the same lot with a building, between the building and the side
line of the lot, extending through, from the front building line, to the rear of the lot.
14
Yard means a space that lies between the principal building or buildings and the nearest lot line or
road right-of-way, as applicable. The mini mum required yard shal l be unoccupied and
unobstructed from the ground upward, except as may be expressly permitted.
(1) Front yard means a yard situated between the front building line and the front lot line, or road
right-of-way, as applicable, extending the full width of the lot.
(2) Rear yard means a yard situated between the rear building line and the rear lot line extending
the full width of the lot.
(3) Side yard means a yard between the side building line and a side lot line that extends from the
front yard to the rear yard.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
1
James Coley
From: Blinson, Amy L. <BlinsonAL@scdot.org>
Sent: Tuesday, July 9, 2024 2:30 PM
To: James Coley
Cc: Pizzuti, Nicholas C.
Subject: RE: Scenic Byway Designation Oconee County
Hi again – Thank you for the clarification. Actually, we are discussing who will be allowed to sponsor a new scenic
byway, and we are leaning towards only allowing governmental entities to sponsor. The reasoning behind this is
because we have had so many private groups basically fall apart over time and leave the Byway they sponsored with no
champion. Point in case, the Cherokee Foothills National Scenic Byway Association, which is for all practical purposes
non‐existent now. With a local government or entity involved, there would always be a point of contact and someone
who is responsible for the Corridor Management Plan and implementing its action plan.
I hope that helps.
Amy
Amy Blinson, SCCED
Transportation Alternatives Program Manager
P 803‐737‐1952 E BlinsonAL@scdot.org
South Carolina Department of Transportation
955 Park Street, P.O. Box 191, Columbia, SC 29202‐0191
From: James Coley <jcoley@oconeesc.com>
Sent: Monday, July 8, 2024 4:26 PM
To: Blinson, Amy L. <BlinsonAL@scdot.org>
Cc: Pizzuti, Nicholas C. <PizzutiNC@scdot.org>
Subject: RE: Scenic Byway Designation Oconee County
*** This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are
confident it is from a trusted source. ***
Good afternoon,
I think there might have been a bit of a misunderstanding when we spoke. The county is not interested in applying for
any new scenic byways at this time. The Planning Commission has, however, asked me to find out more about the
application process, and specifically the role of the Planning Commission/ County Council in the application process. The
commission is looking to determine if a private group could apply for state scenic designation without the County being
party to their application.
We sincerely appreciate our partnerships with SCDOT at all levels and look forward to continuing to work together.
231
2
Best regards,
James Coley
Director
Oconee County Planning and Zoning
415 S. Pine Street
Walhalla, SC 29691
Phone: (864) 638.4218
CONFIDENTIALITY NOTICE:
All e-mail correspondence to and from this address may be subject to public disclosure under
the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or
entity to which it is addressed, and may contain information that is proprietary, privileged, confidential or otherwise legally
exempt from disclosure.
If you are not the intended recipient, you may not read, use, copy, or distribute this e‐mail message or its attachments. If
you believe you have received this e‐mail message in error, please contact the sender by reply e‐mail or telephone
immediately and destroy all copies of the original message.
From: Blinson, Amy L. <BlinsonAL@scdot.org>
Sent: Tuesday, July 2, 2024 3:17 PM
To: James Coley <jcoley@oconeesc.com>
Cc: Pizzuti, Nicholas C. <PizzutiNC@scdot.org>
Subject: RE: Scenic Byway Designation Oconee County
Hi Mr. Coley -Thank you for your inquiry about the SC Scenic Byways program. I know I had conversations last year with Theresa Spicer about a new Scenic Byway on Hwy 130. I sent her a lot of the same information below. Oconee County already has 3 designated Scenic Byways, 2 of wh
Hi Mr. Coley - Thank you for your inquiry about the SC Scenic Byways program. I know I had
conversations last year with Theresa Spicer about a new Scenic Byway on Hwy 130. I sent her a lot
of the same information below.
Oconee County already has 3 designated Scenic Byways, 2 of which have national designation:
1) The Cherokee Foothills National Scenic Byway (SC-11), which starts at the intersection of
SC-11 and I-85, and runs through to Pickens County.
2) The Savannah River National Scenic Byway (SC-24), which starts at the intersection of SC-
11 and SC-24 and runs through to Anderson County.
3) The Falling Waters SC Scenic Byway, which encompasses SC-107, from SC-28 up to the
NC border, and S-413 and SC-130 up to the NC border.
232
3
As I said in our earlier call, we are not currently accepting new applications for Scenic Byway
designation as we are in the process of updating the program requirements and application
process. However, you can go ahead and provide me with some preliminary information such as why
you seeking the designation and what you hope to accomplish with it. What road(s) is proposed and
provide the proposed beginning and ending points (mile marker and/or intersections with other roads,
etc.) and the length in miles. A map of the route should also be provided. Also, we will need to know
what government entity (I am assuming the County?) will be stepping up to apply for the designation
and committing to maintain the Byway and its intrinsic qualities for the future. All of this will at some
point need to be laid out in a Corridor Management Plan. I’ve attached the Corridor Management
Plan that was completed for the last Scenic Byway that was created. A CMP is required before any
new Byway can be authorized by the Legislature, but you wouldn’t need it for the initial application.
And since the County already has 3 Scenic Byways, we would also expect the County to address
how they are maintaining/supporting and plan to protect these designations, before considering
adding any new ones.
Proposed Scenic Byways are required to have 1 or more of the following intrinsic qualities (tangible
and intangible resources found within the corridor) to be considered for designation. So please
include which of these qualities you believe the proposed Byway has:
Scenic: the composition of features that are regionally representative, associative or inspirational.
These features are measured by their memorableness and distinctiveness of visual impression, their
intactness and their unity
Historic: landscapes and structures that represent the legacy of the past
Cultural: activities or objects that represent unique and distinctive expressions of community life,
customs or traditional ways and identify a place, region or culture
Recreational: passive and active leisure activities usually associated with outdoor recreation that
we seek to refresh and renew our spirits
Natural: pleasing visual experience of natural areas and/or ecologically-sensitive landscapes
representing natural occurrences including landforms, water, vegetation and wildlife characteristics
Archaeological: sites, artifacts or structures representing past human life and activities
One thing that I must impress upon you is that Scenic Byway designation does not give SCDOT any
power to stop or alter development of the road itself, or the development or use of any property along
the Byway route. I have had inquiries from people who were seeking to stop transmission lines or
road widening by requesting designation, and Scenic Byway designation does not stop this. The only
thing that is prohibited by law is new billboards – and the existing ones are grandfathered in.
I know that’s a lot to take in, so please call or email me if you have any questions!
Have a good 4th of July!
Amy
Amy Blinson, SCCED
Transportation Alternatives Program Manager
233
4
P 803‐737‐1952 E BlinsonAL@scdot.org
South Carolina Department of Transportation
955 Park Street, P.O. Box 191, Columbia, SC 29202‐0191
From: James Coley <jcoley@oconeesc.com>
Sent: Wednesday, June 26, 2024 4:43 PM
To: Blinson, Amy L. <BlinsonAL@scdot.org>
Subject: Scenic Byway Designation Oconee County
*** This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are
confident it is from a trusted source. ***
Ms. Blinson,
Thank you for taking my call this afternoon. The Oconee County Planning Commission is interested in learning more
about the Scenic Byway program with the state and would like to know specifically about the application process, and
how the Planning Commission and our County Council would be involved in the designation process. Thank you for any
information you can provide.
Best regards,
James Coley
Director
Oconee County Planning and Zoning
415 S. Pine Street
Walhalla, SC 29691
Phone: (864) 638.4218
CONFIDENTIALITY NOTICE:
All e-mail correspondence to and from this address may be subject to public disclosure under
the South Carolina Freedom of Information Act (FOIA). This correspondence is intended exclusively for the individual or
entity to which it is addressed, and may contain information that is proprietary, privileged, confidential or otherwise legally
exempt from disclosure.
If you are not the intended recipient, you may not read, use, copy, or distribute this e‐mail message or its attachments. If
you believe you have received this e‐mail message in error, please contact the sender by reply e‐mail or telephone
immediately and destroy all copies of the original message.
234
Source: Oconee County website. First collected Nov 21, 2026.