Technical Services
Update
Oconee County Emergency Services
July 25, 2024
Technical
Services
Division
Background
Traditionally duties have been shared among
various other OCES personnel and contracted to
outside vendors.
Need was identified to expand in-house
capabilities, increase efficiency of technology
oversight, and enhance services available
December 2023: Full-Time Position Added shared
duties of EM Planner and Technical Services
February 2024: Part-Time position added for
additional Technical Services Support.
March 2024
• Standardized programming deployed to all OCES
Staff radios to address reported programmatic
issues (approx. 60 subscriber units updated)
• Technical Services team visits Fire Chiefs’
Association, Rescue Chiefs’ Association, and
multiple other department monthly meetings to
introduce team and begin identifying areas to
provide support.
• Engaged Radio Committee to continue work of
identifying priorities for standardized template
design for County-wide deployment.
• Began attending monthly coordination meetings
with Prisma Health Ambulance, Prisma
Dispatch, and OCSO Dispatch.
April 2024
• Complete inventory & reallocation of all OCES Staff
radio equipment
• Allocation of station-assigned portable radios for Oconee
Fire staffed roles.
• Standardized programming template in place across all
staff.
• Held initial coordination meeting with OCSO
Technical Services/Dispatch team
• Technical Services team assigned responsibility for
oversight of all OCES Vehicle Upfitting and
aftermarket equipment oversight.
• Completed full inventory of all OCES vehicles with
priority of identifying any issues with electrical,
warning, and radio systems.
• Completed full inventory of Cradlepoint mobile
internet routers, developed plan for location-based
dispatch program implementation.
May 2024
• Full Inventory of all EOC technology assets completed
and tracking, replacement plans identified.
• Developed and began implementing plan for
development of “Field Comm” program including
upfitting of existing vehicle allocated to this program.
• Conducted site visits at all Oconee County Radio System
tower sites to identify details of repeater and system
equipment.
• Confirmed functionality of all repeaters and voting
equipment.
• Purchased and placed in-service a new Starlink Satellite
system for resilient internet access when working in
remote areas or during times of terrestrial service
outages.
• Faster service, unlimited access, more cost effective than
former “V-SAT” service.
• Antenna to be mounted on Field-Comm vehicle for rapid
deployment.
June 2024
• Began multi-phased process of implementing
transition from primarily analog phone lines in EOC /
OCES Offices to the Oconee County Voice over IP
(VoIP) system for enhanced telecommunication
capabilities and coordination.
• New P25 compatible multi-mode repeater
equipment purchased for expansion of existing
infrastructure to support additional system capacity.
• Anticipated delivery Q3 2024.
• Conducted a full “spring cleaning” and
reorganization of the EOC in preparation for
upcoming Oconee Nuclear Station FSE.
• Engaged a vendor to conduct a feasibility study and
present recommendations for future radio system
enhancement options, completed a strategic
planning meeting and radio site visits.
July 2024
•Received (9) new Kenwood NX 5000 series
portable radios for deployment to Station 21
staff and officers for testing.
• Compatible with MSA G1 AirPak communication
pairing.
•Participated in Dress Rehearsal of ONS FSE
supporting communications and technology
needs.
•VoIP Phone system transition completed
•Installation & deployment of station alerting
system at Station 21
Ongoing
Projects in
Progress
• County-wide radio updates – beginning
8/2024
• Anticipated completion 10/2024
• Assigned Operations Channel at time of
Dispatch
• Ongoing testing with Station 21 first-due
area, excellent feedback to date.
• Further expansion anticipated Q4 2024.
• Standardization of radio equipment
approved for use on the Oconee County
Public Safety Radio System (additional
information to follow)
Approved
Equipment
Standardization
• Purpose:
• Standardization of programming deployment, equipment
compatibility, and verification of equipment
function/quality.
• Ensure consistent pricing and utilization of Contract
pricing, vendor lead time monitoring, etc.
• Process:
• Multiple approved options for Portable and Mobile two-
way radio equipment
• Individual departments may purchase equipment directly,
programming must be completed by an approved Oconee
County Public Safety Radio System programmer (either
OCES Technical Services or approved programmer)
• Departments may request that OCES directly purchase
equipment, complete programming and distribute to
department for simplicity through authorization of OCES
to deduct cost from department funds.
Channel
Assignment
Transition
• ALL County Emergency vehicles must be
equipped with a mobile radio capable of
operating on the current DMR Tier II Multi-Site
digital system before further progress can be
made in transitioning to channel assignments
upon dispatch.
• Currently many departments have legacy mobile
radios that need to be upgraded immediately.
Upgrading these radios to meet current
standards are the responsibility of the individual
department.
• All new vehicles allocated to departments will
come equipped with radios meeting then-
current standards.
Questions?
OCES Office: 864-638-4200
• Desk: 864-364-5905
• Cell: 864-324-2771
• Email: vsmith@oconeesc.com
Aaron Smith:
• Desk: 864-364-5906
• Cell: 864-324-3319
• Email: epatterson@oconeesc.com
Eli Patterson: