RecordWell Data

Backup Material

Oconee County · Oconee County · meeting of Jul 25, 2024 · Other

Open the original document More from Oconee County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Technical Services Update Oconee County Emergency Services July 25, 2024 Technical Services Division Background Traditionally duties have been shared among various other OCES personnel and contracted to outside vendors. Need was identified to expand in-house capabilities, increase efficiency of technology oversight, and enhance services available December 2023: Full-Time Position Added shared duties of EM Planner and Technical Services February 2024: Part-Time position added for additional Technical Services Support. March 2024 • Standardized programming deployed to all OCES Staff radios to address reported programmatic issues (approx. 60 subscriber units updated) • Technical Services team visits Fire Chiefs’ Association, Rescue Chiefs’ Association, and multiple other department monthly meetings to introduce team and begin identifying areas to provide support. • Engaged Radio Committee to continue work of identifying priorities for standardized template design for County-wide deployment. • Began attending monthly coordination meetings with Prisma Health Ambulance, Prisma Dispatch, and OCSO Dispatch. April 2024 • Complete inventory & reallocation of all OCES Staff radio equipment • Allocation of station-assigned portable radios for Oconee Fire staffed roles. • Standardized programming template in place across all staff. • Held initial coordination meeting with OCSO Technical Services/Dispatch team • Technical Services team assigned responsibility for oversight of all OCES Vehicle Upfitting and aftermarket equipment oversight. • Completed full inventory of all OCES vehicles with priority of identifying any issues with electrical, warning, and radio systems. • Completed full inventory of Cradlepoint mobile internet routers, developed plan for location-based dispatch program implementation. May 2024 • Full Inventory of all EOC technology assets completed and tracking, replacement plans identified. • Developed and began implementing plan for development of “Field Comm” program including upfitting of existing vehicle allocated to this program. • Conducted site visits at all Oconee County Radio System tower sites to identify details of repeater and system equipment. • Confirmed functionality of all repeaters and voting equipment. • Purchased and placed in-service a new Starlink Satellite system for resilient internet access when working in remote areas or during times of terrestrial service outages. • Faster service, unlimited access, more cost effective than former “V-SAT” service. • Antenna to be mounted on Field-Comm vehicle for rapid deployment. June 2024 • Began multi-phased process of implementing transition from primarily analog phone lines in EOC / OCES Offices to the Oconee County Voice over IP (VoIP) system for enhanced telecommunication capabilities and coordination. • New P25 compatible multi-mode repeater equipment purchased for expansion of existing infrastructure to support additional system capacity. • Anticipated delivery Q3 2024. • Conducted a full “spring cleaning” and reorganization of the EOC in preparation for upcoming Oconee Nuclear Station FSE. • Engaged a vendor to conduct a feasibility study and present recommendations for future radio system enhancement options, completed a strategic planning meeting and radio site visits. July 2024 •Received (9) new Kenwood NX 5000 series portable radios for deployment to Station 21 staff and officers for testing. • Compatible with MSA G1 AirPak communication pairing. •Participated in Dress Rehearsal of ONS FSE supporting communications and technology needs. •VoIP Phone system transition completed •Installation & deployment of station alerting system at Station 21 Ongoing Projects in Progress • County-wide radio updates – beginning 8/2024 • Anticipated completion 10/2024 • Assigned Operations Channel at time of Dispatch • Ongoing testing with Station 21 first-due area, excellent feedback to date. • Further expansion anticipated Q4 2024. • Standardization of radio equipment approved for use on the Oconee County Public Safety Radio System (additional information to follow) Approved Equipment Standardization • Purpose: • Standardization of programming deployment, equipment compatibility, and verification of equipment function/quality. • Ensure consistent pricing and utilization of Contract pricing, vendor lead time monitoring, etc. • Process: • Multiple approved options for Portable and Mobile two- way radio equipment • Individual departments may purchase equipment directly, programming must be completed by an approved Oconee County Public Safety Radio System programmer (either OCES Technical Services or approved programmer) • Departments may request that OCES directly purchase equipment, complete programming and distribute to department for simplicity through authorization of OCES to deduct cost from department funds. Channel Assignment Transition • ALL County Emergency vehicles must be equipped with a mobile radio capable of operating on the current DMR Tier II Multi-Site digital system before further progress can be made in transitioning to channel assignments upon dispatch. • Currently many departments have legacy mobile radios that need to be upgraded immediately. Upgrading these radios to meet current standards are the responsibility of the individual department. • All new vehicles allocated to departments will come equipped with radios meeting then- current standards. Questions? OCES Office: 864-638-4200 • Desk: 864-364-5905 • Cell: 864-324-2771 • Email: vsmith@oconeesc.com Aaron Smith: • Desk: 864-364-5906 • Cell: 864-324-3319 • Email: epatterson@oconeesc.com Eli Patterson:

Source: Oconee County website. First collected Nov 21, 2026.